Silicon Valley Clean Energy Community Resilience Program - Capital Projects Grant Agreement

Sunnyvale City Council
June 21, 2022

Document
Silicon Valley Clean Energy Community Resilience Program - Capital Projects Grant Agreement
Meeting
June 21, 2022
Body
Sunnyvale City Council
Pages
28
Original file
2.9 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

-1-
12955-0001\2487827v1.doc

SILICON VALLEY CLEAN ENERGY

COMMUNITY R
ESILIENCE PROGRAM – CAPITAL

PROJECTS GRANT AGREEMENT
THIS AGREEMENT is made and effective as of _________, 2022 (“Effective Date”), by and between the SILICON VALLEY CLEAN ENERGY AUTHORITY ("SVCE"), an independent public agency, and City of Sunnyvale, a local municipality (“Recipient”). In consideration of the covenants, conditions and undertakings set forth herein, the parties agree as follows:

1. RECITALS. This Agreement is made with respect to the following facts and purposes which each of the parties acknowledge and agree are true and correct:

A. SVCE’s community resilience program (“Program”) will provide $5M in grants to member jurisdictions to plan and develop resilience projects. The grant maximum for each jurisdiction is based on proportion of load as determined by SVCE.

B. As a condition of eligibility to receive funding under the Program, projects must:
(1) support a critical facility and/or provide community services during a power outage; (2) enable self-sufficient access to power during an outage, or decrease the risk of power outages; and (3) be zero carbon.

C. Recipient submitted an application for Program funding, attached hereto and incorporated herein as Exhibit A, for installation of energy resilience infrastructure (“Project”).

The scope and estimated budget for the Project are attached hereto and incorporated herein as Exhibit B.

D. SVCE finds that the use of Grant Funds described herein furthers a public purpose and meets the goals and objectives established for the Program, and desires to award Recipient a one-time grant pursuant to the terms of this Agreement.

2. GRANT. SVCE hereby agrees to provide funding to Recipient in an amount not to exceed $327,680 subject to the provisions of this Agreement (“Grant Funds”). Such Grant Funds shall be disbursed to Recipient on a reimbursement basis. It is agreed and understood that the Grant Amount is a ceiling and that SVCE will only reimburse the allowable cost of services actually rendered as authorized by SVCE at or below the Grant Amount established herein.

3. REIMBURSEMENT OF GRANT FUNDS. Grant Funds shall be reimbursed pursuant to the following process:

A. SVCE shall reimburse Recipient for its actual and reasonable costs of constructing the Project up to the agreed upon Grant Funds.

B. Requests for payment submitted to SVCE shall include: 1) an itemized list of all expenditures; 2) supporting documentation that clearly identifies the expenditure(s) in relation to Attachment 1

Page 1 of 28 ends

-2-
12955-0001\2487827v1.doc
the scope of the Project set forth in Exhibit B of this Agreement; and 3) the Job Impacts Data Collection Worksheet, attached hereto as Exhibit C. Payment requests should be aggregated and submitted no more often than once per month.

C. SVCE shall process requests for payment and remit payment within 30 days.

D. If, in SVCE’s sole discretion, the request for payment is incomplete, inadequate, or inaccurate, SVCE may dispute the invoice for reasonable cause and hold all or a portion of the payment request until all required information is received or corrected. Any penalties imposed on the Recipient by a contractor, or other consequence, because of delays in payment or other breach of the agreement between the Recipient and the contractor are the responsibility of the Recipient and are not reimbursable under this Agreement.

E. Unless otherwise authorized by SVCE in writing, Recipient shall submit all documentation of Project completion, including a final request for payment, within sixty (60) days of Project completion.

F. Final payment of remaining Grant Funds, including any amounts withheld from previous payments, shall be paid up to the total amount of the actual Project cost, not to exceed the Grant Funds amount set forth in this Agreement, upon completion of the Project, receipt of the final report and final request for payment from the Recipient in a form and content satisfactory to SVCE.

4. USE OF GRANT FUNDS. Recipient shall use the Grant Funds to support the Program as set forth in Exhibits A and B. Any use(s) of Grant Funds not contemplated in this Agreement must be approved in writing by SVCE. This Agreement was awarded to Recipient based on the application submitted by Recipient with the intention that the awarded funds would be used to implement the Project as described in Exhibit A and Exhibit B. Any substantive deviation during Project implementation may require reevaluation or result in loss of funding. In no event shall Recipient’s Grant Funds or scope of work be increased. If Recipient knows or should have known that substantive changes to the Project will occur or have occurred, Recipient will immediately notify SVCE in writing. SVCE will then determine whether the Project is still consistent with the overall objectives of the Program and whether the changes would have negatively affected the Project ranking during the Grant evaluation process. SVCE reserves the right to have Grant Funds withheld from Recipient, or refunded to SVCE, due to Recipient’s failure to satisfactorily complete the Project or due to substantive changes to the Project.

5. TERM. This Agreement shall commence on the Effective Date, and shall remain and continue in effect until the final Grant Funds are paid to Recipient, unless sooner terminated pursuant to the provisions of this Agreement. Projects must be complete no later than December 31, 2023.

6. REPORTING AND RECORDS. Recipient agrees to cooperate with SVCE and provide requested information, if any, related to the use of Grant Funds and the Project, including for the purposes of SVCE’s evaluation, measurement, and verification activities for the Program.

Recipient will cooperate in good faith with SVCE or its authorized representative in performing evaluation, measurement and verification (EM&V) of the Program. Information accessed for Attachment 1

Page 2 of 28 ends

-3-
12955-0001\2487827v1.doc
EM&V may include, but is not limited to, onsite verification of Project operation, Program compliance, and Project records, analysis of facility billing metered data, analysis of data collected from facility-owned submetering, and collection of supplementary metered data on- site. All information collected will be held confidentially and will be used by SVCE or its authorized representative for Program analysis purposes only. Recipient is responsible for ensuring, through a separate agreement between Recipient and property owner, that property owner shall cooperate with SVCE to provide any documentation and assist in analysis and provide access to the Project site at reasonable times, during the construction of the Project and for a period of up to two (2) years from the completion of the Project. During the course of the Project and for three (3) years thereafter from the receipt of the final Grant Funds, the Recipient agrees to maintain, intact and readily accessible, all communications, data, documents, reports, records, contracts, and supporting materials relating to the Project, as SVCE may require. The Recipient agrees to have financial and compliance audits performed as SVCE may require.

7. LEGAL RESPONSIBILITIES. Recipient shall keep itself informed of all local, State and Federal ordinances, laws and regulations which in any manner affect those employed by it or in any way affect the performance under this Agreement. Recipient shall at all times observe and comply with all such ordinances, laws and regulations. SVCE, and its officers and employees, shall not be liable at law or in equity occasioned by failure of Recipient to comply with this Section.

8. PREVAILING WAGES. By accepting the Grant Funds, Recipient as a material term of this Agreement shall be fully responsible for complying with all California public works requirements including but not limited to payment of prevailing wage. Therefore, as a material term of this Agreement, to the extent required by California law, Recipient shall ensure that prevailing wages are paid, that the project budget for labor reflects these prevailing wage requirements, and that the project complies with all other requirements of prevailing wage law, including that Recipient’s subcontractors also comply with all applicable public works/prevailing wage requirements.

9. PROCUREMENT. At minimum, Recipient shall solicit at least three bids and select the lowest bidder when procuring goods or services, where the costs are eligible for reimbursement under this Agreement. In the event the Recipient is required by statute or policy to solicit additional bids or follow a more stringent solicitation process, Recipient shall follow such process. Recipient may also procure goods and services through California Government Code section 4217.10.

10. CALIFORNIA PUBLIC RECORDS ACT. Recipient acknowledges that SVCE is subject to the California Public Records Act (Gov. Code § 6250 et seq.). SVCE acknowledges that Recipient may submit information to SVCE that Recipient considers to be confidential, proprietary, or trade secret information. Only such information clearly designated in writing as “confidential” shall be deemed “Confidential Information.” Upon request or demand of any third person or entity (“Requestor”) for the production, inspection, and/or copying of Confidential Information, SVCE shall notify Recipient that such request has been made. Recipient shall be solely responsible for taking whatever legal steps are necessary to protect Confidential Information and to prevent its release to the Requestor. Without limiting SVCE’s right to disclose Confidential Information as may be required by law, if Recipient takes no such action Attachment 1

Page 3 of 28 ends

-4-
12955-0001\2487827v1.doc
after receiving the foregoing notice from SVCE, SVCE shall be permitted to release information it deems subject to disclosure.

11. NOTICES. Any notices provided under this Agreement must be in writing and may be given either by mail or e-mail to the following addresses:

SVCE: Silicon Valley Clean Energy Authority
333 W. El Camino Real #290
Sunnyvale, CA 94087
Attention: _______________
RECIPIENT: City of Sunnyvale
505 W. Olive Ave, Ste 115
Sunnyvale, CA 94086
Attention:_Madeline Willett

12. INDEPENDENT CONTRACTOR.

A. Recipient shall at all times remain as to the SVCE a wholly independent contractor. The personnel performing the services under this Agreement on behalf of Recipient shall at all times be under Recipient's exclusive direction and control. Neither SVCE nor any of its officers, employees, agents, or volunteers shall have control over the conduct of Recipient or any of Recipient's officers, employees, or agents except as set forth in this Agreement. Recipient shall not at any time or in any manner represent that it or any of its officers, employees or agents are in any manner officers, employees or agents of the SVCE. Recipient shall not incur or have the power to incur any debt, obligation or liability whatever against SVCE, or bind SVCE in any manner.

B. No employee benefits shall be available to Recipient in connection with the performance of this Agreement. Except for the fees paid to Recipient as provided in the Agreement, SVCE shall not pay salaries, wages, or other compensation to Recipient for performing services hereunder for SVCE. SVCE shall not be liable for compensation or indemnification to Recipient for injury or sickness arising out of performing services hereunder.

13. INDEMNIFICATION. Recipient shall indemnify, protect, defend and hold harmless SVCE, its elected officials, officers, employees, volunteers, and representatives from any and all suits, claims, demands, losses, defense costs or expenses, actions, liability or damages of whatsoever kind and nature which SVCE, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property arising out of Recipient’s acts or omissions arising out of or in any way related to the performance or non-performance of this Agreement.

14. INSURANCE.

A. On or before the commencement of the term of this Agreement, Recipient shall furnish SVCE with certificates showing the type, amount, class of operations covered, effective dates, and dates of expiration of insurance coverage in compliance with the requirements in this Attachment 1

Page 4 of 28 ends

-5-
12955-0001\2487827v1.doc
Section. Recipient shall maintain such coverage in full force at all times for the duration of this Agreement, at its sole cost and expense. Nothing herein shall be construed as a limitation on Recipient indemnification obligations under this Agreement.

B. Recipient shall maintain the following minimum insurance coverages:
1) Workers’ compensation, as required by the State of California; 2) Commercial general liability coverage with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate for bodily injury and property damage. ISO occurrence Form CG 0001 or equivalent is required;
3) Comprehensive automotive liability coverage with minimum limits of $1,000,000 per accident for bodily injury and property damage. ISO Form CA 0001 or equivalent is required.

C. Such coverages shall be issued by an insurer(s) licensed to conduct business in the State of California, with a minimum A.M. Best’s Insurance Rating of A:VII unless otherwise approved in writing as satisfactory to SVCE.

D. The insurance limits required by SVCE are not represented as being sufficient to protect Consultant. Recipient is advised to confer with its insurance broker to determine adequate coverage for Recipient.

15. DEFAULT AND TERMINATION. Should an Event of Default occur, SVCE shall provide a notice of default to Recipient and shall give Recipient at least fifteen (15) calendar days from the date the notice is sent to cure the Event of Default. If Recipient fails to cure the Event of Default within the time prescribed, SVCE may, at SVCE’s sole discretion, withhold Grant Funds not yet disbursed hereunder, require the return or repayment of Grant Funds already disbursed, and/or terminate this Agreement by written notice which shall be effective upon receipt by Recipient. “Event of Default” shall mean the occurrence of any one or more of the following events by Recipient: (a) any false statement, representation, or warranty contained in this Agreement, the Application, or any other document submitted to SVCE; (b) failure to comply with applicable laws; (c) a failure to maintain in effect any policy of insurance required under this Agreement; or (d) a material breach of this Agreement.

16. NON-APPROPRIATION. Recipient acknowledges that SVCE is a public agency. In the event that sufficient funds for the performance of this Agreement are not appropriated by the SVCE Board of Directors in any fiscal year covered by this Agreement, this Agreement may be terminated by SVCE, without penalty, by giving notice to Recipient of such facts and of SVCE’s intention to terminate.

17. NON-WAIVER. Failure to exercise any right the SVCE may have or be entitled to, in the event of default hereunder, shall not constitute a waiver of such right or any other right in the event of a subsequent default.

Attachment 1

Page 5 of 28 ends

-6-
12955-0001\2487827v1.doc

18. AMENDMENT OF AGREEMENT. No modification, rescission, waiver, release or amendment of any provision of this Agreement shall be made except by a written agreement executed by the Recipient and the SVCE.

19. ASSIGNMENT PROHIBITED. In no event shall the Recipient assign or transfer any portion of this Agreement.

20. GOVERNING LAW. This Agreement shall be governed by the laws of the State of California. Any legal action brought under this Agreement must be instituted in the Superior Court of the County of Santa Clara, State of California.

21. NO THIRD-PARTY BENEFIT. The provisions of this Agreement are for the sole benefit of the parties hereto and confer no rights, benefits, or claims upon any person or entity not a party hereto.

22. SEVERABILITY. If any provision of this Agreement is held to be invalid or unenforceable for any reason, the remaining provisions will continue in full force without being impaired or invalidated in any way. The parties agree to replace any invalid provision with a valid provision that most closely approximates the intent and economic effect of the invalid provision.

23. RECIPIENT'S AUTHORITY. Recipient represents and warrants that (a) it has the power and authority to enter into this Agreement and to perform its obligations hereunder; (b) the person who executes this Agreement on its behalf has the necessary authority to bind Recipient; and (c) neither the execution and delivery of this Agreement nor the performance of its obligations hereunder will constitute a violation of, a default under, or conflict with any term of any governance documents or other agreements to which it is bound.

24. COUNTERPARTS. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original and all of which shall be taken together and deemed to be one instrument. Faxed and PDF counterpart signatures are sufficient to make this Agreement effective.

25. ENTIRE AGREEMENT. This Agreement contains the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party's own independent investigation of any and all facts such party deems material.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written.

SILICON VALLEY CLEAN ENERGY AUTHORITY
Attachment 1

Page 6 of 28 ends

-7-
12955-0001\2487827v1.doc
________________________________

APPROVED AS TO FORM:
________________________________
Greg Stepanicich, General Counsel

CITY OF SUNNYVALE
By: _____________________________
Name: Kent Steffens
Title: City Manager
By: _____________________________
Name:

Title:
[*Note: Signatures of two corporate officers are required for corporations – First signature must be one of the following: 1) the chairman of the board; 2) the president; or 3) any vice president. The second corporate signature must be one of the following: 1) the secretary; 2) any assistant secretary; 3) the chief financial officer; or 4) any assistant treasurer. Signature of City Manager is required for cities.]
Attachment 1

Page 7 of 28 ends

-8-
12955-0001\2487827v1.doc

EXHIBIT A
[attach Application]
Attachment 1

Page 8 of 28 ends

gggggggggggggggggggggggggggggggggg gggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg   
g
ggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggg ggggggg gg gggggggggggggggggg gggggggggggggggggggggggggggggggggggg gggggggggggggggg  ggg ggggggggggggggg gggggggggggggggggggggggggggggggggggggggg ggggggggg gggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggg gg gg ggggggggg ggggggg ggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggg gggggggggg
gggggggggg ggggggggggggggggggggggggggg g gg

gggggggggggggggg
gg


ggggggggggggggggggggg
gggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggg ggggggggggggggg ggggg gggggggggggggggggg gggggggggg gggggggggggggggggggggggggggg gggggggg gggg gggg gggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggg
gggggggg
gg
ggggg
nnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnn nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 000000000 000000 0000000  0000000  000000 000 0000 0000  00000  00000 000000 0000 00000  0000  00 00000 0000 000  00  00000 00 000 000  000  0000
000 000 00  00000  00000
0000 00000 0000  000000  0000 0000 00000 00  000  000
0000 0000 000  000000  00000
00000 0000 0000  00000  00000
0000 000 0000  00000  00
00000000 00000 000  00000  000000 000000 000 00  000  0000 nnnnnnnnnn nnnnnn 
n nn



n
nnnnn
nnnnn
nnnnnnnnnnnnnnnnnnnnnnnnnnn
Attachment 1

Page 9 of 28 ends

gggggggggggggggggggggggggggggggggg gggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggg g gggg
gggggggggggg gggg ggg gggggggggggg
gg gggggggggggggggg ggggggggg
gggggggggggggg gggggggggggggggggggggggggggggg
gg gggggggg gg gggggggggggggggggggggggggg gggggggggggggggggggg gggg gg gggggggggg
gg gggggggggg

gggggggggg gggg gg ggggggggg ggggggg gggggggggggggggg gggggggggggggggggg gggg g gg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg gg gggggggg gggggggggggggggggggggggggggggggggggg
ggggg ggggggggggggggg gggggggggg
gggggggggggggg gggggg
ggggggggggggggggggg ggggggg gggggggggggggggggggggggg gggggggggggggggg ggg gggg gggggggggggg ggggggggggggggg gggggggggggggggggggggggggggggg ggggggggggg



g ggggggggggggggggggggggggggggggggggggggg gg gggggggggggg ggggggggggggg ggggggggg gggggggggggggg gggg gg ggggggggggggggggggggggggg ggggggggggggg ggggg ggggggggggg ggggggg gggg gggg ggggg gggggggggggggggggggg ggggggggggg gggggggggggggggggg gg ggggggggggggggg Attachment 1

Page 10 of 28 ends

gggggggggggggggggggggggggggggggggg gggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg 


ggggg ggggggggg g
ggggg ggggggggggg g
ggggggggggg
gggg ggg
ggggg g  ggggg
ggg g

gg ggggggggggggggggggggggggggggggggggg gggggggggg '
g

gg gggggggggggggggggggggggggggg
'
g

gg ggggggggggggggg
g

ggggggggg gggggggggggg ggg gggggggg ggggggg gggggg ggggggggggggg gg gggggggggg
gggggggggggg gggggggggggggggggg gggggggggg gg ggggggggggg gggg gggggggg gggg
ªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªª


ªªªª
ªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªª
ª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª


ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ª

ª
ªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªª
ªªªªªªªªªªªªªªªªªª


ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªª
ªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªª
ªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªª ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªª
ªª
ªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª Attachment 1

Page 11 of 28 ends

gggggggggggggggggggggggggggggggggg gggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggg gg gggggggggggg ggg gg ggggggggggggggggggggggggggg ggggggg
gggggggggggg gg ggggggggggggg gggggggggggggg gggg gg gggggggg ggggggg ggggggggg ggggggggggggggg ggggg ggggggggggggg ggggggggggggg ggggggggg ggggg ggggggg
gggggggggggggggggg ggggggggg ggg ggggggggggggggggggggggggggggggggggggg ggg gggg gg ggggggggggggg
gggggggggggg ggggggg gggggggggggggggggggg ggggggg ggggggg gggggg gggggggggggggggggggggggggggg ggggggg ggggggggggggggggggggggg gg gggggg g ªª


ªªªªªª


ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªª
ªªªªªª
ªªªªªªªªªªªªªªªªªªª
ªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªª
ªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªª
ªªª
ªª
ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªª
ªªªªªªªªª
ªª
ªªªªªªªªªªªªªªªªªªªªªªªªª ªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªª
ªªª


ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªª

ª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª -ªªªªªªªªªªªªªªª-

ªªªªªªªªªªªªª-ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªª
ªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªª
ªªªªªªªªªªªªªªªªªªª
ªªªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªªªªªª
ªªªªªªªªªªªªªª

ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª
ªªªªª
ªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªªª ªªªªªªªªªªªªªªªªªªªªªªªªªª
Attachment 1

Page 12 of 28 ends

gggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggggggggggg ggggggggggggggggggggggggggggggggggggggggggg gggggggggggggg ggggggg gggggggggggggggggggggggggg gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg 

g
gggggggg g gggggg g ggggggg g g ggg ggggg gggggg g g gggggggggg g g gg gggg ggggg ggg gggg ggg gggg ggg ggg ggggg gg qq qqq g gggggggg ggggggggggg ggg gggg gggggg ggg ggggggg
g gggggg g ggg gggggggg ggg g gggg g gggggggggggg gg gggg gggggg g g gg gggggggg ggggg g
g gggg ggggggg gg ggggg gg g g gg gggggggg gg gggg gggggg ggg ggg gg g g ggggggggg
g g g ggggggg gg gggggg g g ggggggggggg gg ggg gggggg g g g gggggggg gggg ggggggg
ggggggg g ggggggggg gggggggggggggggg gg g g gggg gggg g gggg gg gggggg gggggg gggggg ggg gggggg ggggg gg gggggg gggggg gg ggggggggg gg ggg ggggg gggg gggggggggggg gg ggggg gg g g ggggggg gggg gg ggggggg g g g ggggggggg g gggggg g gggggggg g g g ggg ggggggg g ggg gggggg g g ggg gggggggg gg ggggggggg ggggggggggggg gggggggg gggg g ggggggg gg ggggggg gggg ggggg gggg ggggggg gg gg g g gg gggggggg
gggggggggg ggg gggggggggggggggggg ggggggggg g g g ggggggg gg g gggggg ggggggg gggggg ggg gg ggggg ggggggggg

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg gggggggg ggg ggg gggggggg ggggg ggg ggg ggg gggg ggg ggggggg ggg g gg gggggggggg ggg ggggggg g g ggggggggggggggggggggggggggg gggggggggggggggggggggggg ggggg gggg g g g g g ggggggg gg gg gg ggg gggggggg
gggggggg gg ggg gggggggg gg gg ggg gggggggg

gg gggggggggggggggg
ggggg gggggg gg gg gg gggggggggg
ggggg gg gggg ggggg gg g g gggg

gggggggg gg ggggg gggggg gggg g g g ggggggg
ggggg gg ggggggggg gggggggggggggggg gggg g ggggggg gg Attachment 1

Page 13 of 28 ends

Attachment 1

Page 14 of 28 ends

-9-
12955-0001\2487827v1.doc

EXHIBIT B
Scope of Work
The City of Sunnyvale will procure and install four EV ARC Units, each one will be located at a separate site as follows: Sunnyvale Public Library, Community Center, Department of Public Safety (DPS) Building, and Corporation Yard.

Each EV ARC unit is equipped with a large, 4.3kW solar array that tracks the sun and stores its own electricity in a lithium-ion battery during the day. They are also equipped with two electric vehicle (EV) charger ports to simultaneously charge up to two EVs. Publicly accessible chargers will offer a low cost per kwh while the chargers for fleet vehicles will not be metered. In event of an outage or inclement weather, the clean electricity produced will be used to charge EVs or power equipment for a varying duration depending upon the load and solar resources at the time of outage. On a day-to-day basis, the units at the Public Library and Community Center will provide EV charging to the public. The units at the DPS Building and the Corporation Yard will provide EV charging for electric fleet vehicles only.

A consultant will be hired to develop a layout plan for each site to demonstrate code compliance.

The units at the Public Library and Community Center are required to be installed on a van- accessible parking space per California Building Code. The units at DPS and the Corporation Yard will be installed in a standard parking space within a gated lot. Each parking space will be analyzed for the proper clearance per manufacturer recommendations to avoid any conflicts.

Staff will also determine the optimal location to ensure solar energy collection is maximized. As supporting documentation for permitting, the manufacturer’s engineering firm will provide the seismic calculations to ensure the unit can safely withstand an earthquake.

Each unit is anticipated to be manufactured and delivered within 90 days from the purchase date.

Prior to delivery of a unit, the site will be cleaned and have surrounding parking spaces blocked off to ensure a smooth delivery.

The City plans to place the order for the four EV ARC units by the end of June 2022. The City is requesting grant funding for the EV ARC units. The site layouts, engineering calculations, and equipment is estimated to cost $327,680.

Attachment 1

Page 15 of 28 ends

-10-
12955-0001\2487827v1.doc

EXHIBIT C
Job Impacts Data Collection Worksheet
Silicon Valley Clean Energy Community Resilience Program Job Impacts Data Collection
Worksheet

Instructions: The form should be completed and submitted with each invoice. Each contractor and subcontractor should complete a separate form. The information will be used by SVCE to better understand the economic impacts of program investments and will have no impact on payment or performance evaluation of the grantee or contractors. Please be as accurate and complete as possible.

Position Title
Total
Employees
in Position*
Average
Hourly
Wage
Total
Hours
Worked**
Employer-
Sponsored
Health
Benefits?
Y/N

Solar Installer
Installation Supervisor
Add rows***

*Sum of all individual employees with at least (1) labor hour during the invoice period
**Sum of all the hours of all employees at this title/wage for the invoice period
***Add rows as need for additional employees
Note: If this reporting system does not align with the funding source of your project, please contact SVCE to discuss possible reporting alternatives.

Attachment 1

Page 16 of 28 ends

-11-
12955-0001\2487827v1.doc

EXHIBIT D
Backup Documentation:
(1) Cost Estimate Breakdown for EV ARC Units
(2) Proposals for Beam EV ARC Units
(3) Sole Source Documentation
(4) EV ARC Infosheet
Attachment 1

Page 17 of 28 ends

Item Description Quantity Unit Price Cost Reimbursable Capital Costs

1.1 PUBLIC USE ONLY - EV ARC™ 4.3 kW solar array and ChargePoint CT4023-GW1, dual-plug derated level-2 smart/networked charging station (Includes 2% DGS discount)
2 $ 65,022.02 $ 130,044.04 $130,044.04

1.2 Battery Upgrade from 22 kWh to 43 kWh 2 $ 9,821.56 $ 19,643.12 $19,643.12

1.3 Emergency Power Panel (Includes 2% DGS Discount) 2 $1,925.70 $ 3,851.40 $3,851.40

1.4 Bumper Stops 2 $357.70 $ 715.40 $715.40

1.5 Mounting and integration of your custom EVSE selection. Hourly labor rate.
4 $ 225.00 $ 900.00 $900.00

1.6 Engineering Services 1 $ 2,000.00 $ 2,000.00 $2,000.00

1.7 Remote Monitoring & Management System (RMMS) - first year included in EV ARC purchase price
0 $360.00 $ 0.00

1.8 EV ARC™ Operation & Maintenance first year of service is included in EV ARC purchase price
0 $582.75 $ 0.00

1.9 ChargePoint Network Subscription Fee – pre-pay 4 additional years on each EV ARC unit, cost is per plug per year
0 $270.00 $ 0.00

1.10 ChargePoint Assure Warranty Coverage - pre-pay 5 years on each EV ARC unit
Standard 1 year manufacturer warranty is free for first year 0 $2,650.00 $ 0.00

1.11 EV ARC™ Warranty – pre-pay 4 additional years on each EV ARC unit 0 $2,300.00 $ 0.00 SUBTOTAL $157,153.96
Sales Tax (9.125%) $14,157.80
Total $171,311.76

2.1 FLEET USE ONLY - EV ARC™ with
(2) Enel X Juicebox J-1772 Plugs
2 $ 61,718.44 $ 123,436.88 $123,436.88

2.2 Battery Upgrade 1 $ 4,910.78 $ 4,910.78 $4,910.78

2.3 Emergency Power Panel (Includes 2% DGS Discount) 2 $1,925.70 $ 3,851.40 $3,851.40

2.4 Bumper Stops 2 $357.70 $ 715.40 $715.40

2.5 O&M Service (First year is included in EV ARC price) 2 $ 0.00 $ 0.00

2.6 RMMS (First year is included in EV ARC price) 2 $ 0.00 $ 0.00

2.7 Manufacturer Warranty - First 12 months is included 2 $0.00 $ 0.00 SUBTOTAL $132,914.46
Sales Tax (9.125%) $12,128.44
Total $145,042.90

3.1 Shipping and Handling is free with State Contract $27,200.00 N/C

4.2 Developing Site Plans, Estimate* 1 $8,000.00 $ 8,000.00 $8,000.00

4.3 Design Contingency* 1 $3,325.34 $3,325.34 $3,325.34 GRAND TOTAL $327,680.00
Cost Estimate Breakdown for EV ARC Units
Refer to Quotes from BEAM Global for EV ARC Units Items 1.1 - 3.1 *Design fees based on preliminary quotes
*Design Contingency accounts for any unforeseen issues during design Attachment 1

Page 18 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

Your EV ARC™ 2020 is an American-made product and will be fabricated in our San Diego, California facility.

EV ARC™ 2020 systems are capable of generating and storing enough clean, solar electricity to charge up to 265 e miles in a single day. Thanks to its battery storage, it can charge electric vehicles day or night, or even during periods of cloudiness, and is also an excellent source of emergency/alternative power. The electricity produced is clean and renewable, reducing 100% of greenhouse gas emissions from ICE vehicles and electric vehicles powered from the utility grid.

The EV ARC™ 2020 is deployed in minutes and has not required any kind of permitting in the over 100 jurisdictions which are currently benefitting from it. It is deployed without any construction or electrical work and does not require civil or electrical engineering, foundations, trenching, electrical connections or upgrades. It will produce energy reliably and consistently but will not generate a utility bill or fail to operate because of a black out or other utility grid failure. It’s no wonder that Google, the City of New York, the State of California and many others across the U.S. and internationally trust the EV ARC™ product line to charge their electric vehicles.

The patented EV ARC™ 2020 is the world’s first and only fully autonomous, transportable, solar-powered electric vehicle charging system.

Designed, engineered and manufactured in the U.S., the EV ARC™ 2020 measures 7.5' X 18' at the base and fits inside a standard parking space without reducing available parking while being ADA compliant.

EV ARC 2020 Product Description™
(858) 790-8140Phone
[email protected]
Andy IkePrepared By
Final Locations TBD
Sunnyvale, CA
USA
Ship To
City of SunnyvaleShip To Name
Department of Public Works
456 W. Olive Ave.

Sunnyvale, CA 94086
USA
Bill To
City of SunnyvaleBill To Name
(408) 730-7512Phone
[email protected]
Civil EngineerTitle
Raymond QiContact Name
City of SunnyvaleCustomer Name
4/29/2022Created Date
Beam EV ARC  Proposal via CA DGS Contract #1-18-61-16™
Customer Details
Billing and Shipping
Your Clean Mobility Expert
Attachment 1

Page 19 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

EV ARC 2020 Diagram™
Attachment 1

Page 20 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

https://caleprocure.ca.gov/PSRelay/ZZ_PO.ZZ_CTR_SUP_CMP.GBL?Page=ZZ_CTR_SUP_PG&Action=U&SETID=STATE&CNTRCT_ID=1-18-61-16 Applicable sales tax will be billed upon invoicing
Payment Terms: Net 30 days
6/23/2022Expiration Date
$145,042.90Grand Total
$12,128.44Tax
$0.00Shipping and
Handling
$132,914.46Total PriceShipping and Handling is FOB Destination and includes:
- Beam Team performing un-load / un-stow of equipment
- Return shipping of support equipment
Please have a 15K capacity forklift onsite upon delivery

EV ARC 2020 Pricing™
Product Product
Code Product Description Quantity List Price Total Price EV ARC™
with (2) Enel
X Juicebox
J-1772 Plugs
ARC-EC2

4.3kW solar array, BeamTrak™, 22kWh (expandable) battery storage, and Beam Charge integrated EV charging system - Configuration 2: Two (2) J1772 couplers with (a) 4.3kW maximum output delivered to either coupler or shared amongst both or (b) 2.2kW fixed output per coupler.

CLIN #4, includes 2% CA DGS Contract discount.

2.00 $61,718.44 $123,436.88
Additional
Battery Pack ABP Increases energy storage in 8 kWh increments.

CLIN #13, includes 2% CA DGS Contract discount. 1.00 $4,910.78 $4,910.78 Emergency
Power Panel EPWR
6kW with 208V or 240V connection (not GFCI protected) including 1x NEMA L14-30 (twist lock), and 120V connections (GFCI protected) including 2x Duplex NEMA 5-20 + 2x NEMA L5-20 (twist lock).

CLIN #14, includes 2% CA DGS Contract discount.

2.00 $1,925.70 $3,851.40
Bumper
Stops BSTP Set of Safety Bollards.

CLIN #15, includes 2% CA DGS Contract discount. 2.00 $357.70 $715.40 1-Year
Operation &
Maintenance
O&M
Service
Operation & Maintenance: Plan includes PV Panel Cleaning, Grease Slew drives, Check Calibration of BeamTrak, Check Battery Charging Systems, Settings, Performance of Inverter, Overall Condition of Structure and Inspect & Confirm Operation of EV Charger. (Service is included for the 1st twelve months for continental U.S. locations when buying through CA State Contract) CLIN #22, includes CA DGS Contract discount.

2.00 $582.75 $0.00
RMMS (1
Year) RMMS
Remote Monitoring and Management System: 4G LTE wireless, BeamTrak™ tracking technology, unit monitoring. First 12 months included with purchase.

Auto-renew option available.

CLIN #18, includes CA DGS Contract discount.

2.00 $360.00 $0.00
Warranty (1
Year)   Manufacturer Warranty - First 12 months included 2.00 $0.00 $0.00 Totals
California DGS Contract Link
Attachment 1

Page 21 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

Your EV ARC™ 2020 is an American-made product and will be fabricated in our San Diego, California facility.

EV ARC™ 2020 systems are capable of generating and storing enough clean, solar electricity to charge up to 265 e miles in a single day. Thanks to its battery storage, it can charge electric vehicles day or night, or even during periods of cloudiness, and is also an excellent source of emergency/alternative power. The electricity produced is clean and renewable, reducing 100% of greenhouse gas emissions from ICE vehicles and electric vehicles powered from the utility grid.

The EV ARC™ 2020 is deployed in minutes and has not required any kind of permitting in the over 100 jurisdictions which are currently benefitting from it. It is deployed without any construction or electrical work and does not require civil or electrical engineering, foundations, trenching, electrical connections or upgrades. It will produce energy reliably and consistently but will not generate a utility bill or fail to operate because of a black out or other utility grid failure. It’s no wonder that Google, the City of New York, the State of California and many others across the U.S. and internationally trust the EV ARC™ product line to charge their electric vehicles.

The patented EV ARC™ 2020 is the world’s first and only fully autonomous, transportable, solar-powered electric vehicle charging system.

Designed, engineered and manufactured in the U.S., the EV ARC™ 2020 measures 7.5' X 18' at the base and fits inside a standard parking space without reducing available parking while being ADA compliant.

EV ARC 2020 Product Description™
(858) 790-8140Phone
[email protected]
Andy IkePrepared By
Final Locations TBD
Sunnyvale, CA
USA
Ship To
City of SunnyvaleShip To Name
Department of Public Works
456 W. Olive Ave.

Sunnyvale, CA 94086
USA
Bill To
City of SunnyvaleBill To Name
(408) 730-7512Phone
[email protected]
Civil EngineerTitle
Raymond QiContact Name
City of SunnyvaleCustomer Name
4/29/2022Created Date
Beam EV ARC  Proposal via CA DGS Contract #1-18-61-16™
Customer Details
Billing and Shipping
Your Clean Mobility Expert
Attachment 1

Page 22 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

EV ARC 2020 Diagram™
Attachment 1

Page 23 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

6/23/2022Expiration Date
$171,311.76Grand Total
$14,157.80Tax
$0.00Shipping and
Handling
$157,153.96Total PriceShipping and Handling is FOB Destination and includes:
- Beam Team performing un-load / un-stow of equipment
- Return shipping of support equipment
Please have a 15K capacity forklift onsite upon delivery

EV ARC 2020 Pricing™
Product Product
Code Product Description Quantity List Price Total Price EV ARC™
with
ChargePoint
Dual Port
J-1772 Plugs
ARC-CP4023

4.3kW solar array, BeamTrak™, 22kWh (expandable) battery storage with ChargePoint CT4023-GW1, dual-plug derated Level 2 smart/networked charging station.

CLIN #2, includes 2% CA DGS Contract discount.

2.00 $65,022.02 $130,044.04
Additional
Battery Pack ABP Increases energy storage in 8 kWh increments.

CLIN #13, includes 2% CA DGS Contract discount. 4.00 $4,910.78 $19,643.12 Emergency
Power Panel EPWR
6kW with 208V or 240V connection (not GFCI protected) including 1x NEMA L14-30 (twist lock), and 120V connections (GFCI protected) including 2x Duplex NEMA 5-20 + 2x NEMA L5-20 (twist lock).

CLIN #14, includes 2% CA DGS Contract discount.

2.00 $1,925.70 $3,851.40
Bumper
Stops BSTP Set of Safety Bollards.

CLIN #15, includes 2% CA DGS Contract discount. 2.00 $357.70 $715.40 Vendor
Catalog
Items - EVSE
Integration

Mounting and integration of your custom EVSE selection. Hourly labor rate.

Segment ID: A

4.00 $225.00 $900.00
Vendor
Catalog Items
- Engineering
Services
Stamped structural calculation packet for Sunnyvale, CA Segment ID: A 1.00 $2,000.00 $2,000.00
1-Year
Operation &
Maintenance
O&M Service
Operation & Maintenance: Plan includes PV Panel Cleaning, Grease Slew drives, Check Calibration of BeamTrak, Check Battery Charging Systems, Settings, Performance of Inverter, Overall Condition of Structure and Inspect & Confirm Operation of EV Charger. (Service is included for the 1st twelve months for continental U.S. locations when buying through CA State Contract)
CLIN #22, includes CA DGS Contract discount.

2.00 $582.75 $0.00
RMMS (1
Year) RMMS
Remote Monitoring and Management System: 4G LTE wireless, BeamTrak™ tracking technology, unit monitoring. First 12 months included with purchase. Auto-renew option available.

CLIN #18, includes CA DGS Contract discount.

2.00 $360.00 $0.00
Warranty (1
Year)   Manufacturer Warranty - First 12 months included 2.00 $0.00 $0.00 Totals
Attachment 1

Page 24 of 28 ends

BeamForAll.com
[email protected]
+1 858-799-4583
Beam Global
5660 Eastgate Drive
San Diego, CA 92121

https://caleprocure.ca.gov/PSRelay/ZZ_PO.ZZ_CTR_SUP_CMP.GBL?Page=ZZ_CTR_SUP_PG&Action=U&SETID=STATE&CNTRCT_ID=1-18-61-16 Applicable sales tax will be billed upon invoicing
Payment Terms: Net 30 days
- Custom Charger PostNotes
California DGS Contract Link
Attachment 1

Page 25 of 28 ends

SOLE SOURCE DOCUMENTATION
Purchase Requisition No. ________
The requested product is a patented, copyrighted or proprietary article available from a single source. It is the only product that will meet the City’s requirements.

Check one and elaborate in the space provided below:
 The product is a component or replacement part for existing City-owned equipment available only from the manufacturer. There is no commercially available substitute.
 Compatibility with items in use by the City is the overriding consideration.

There is no comparable competitive product
 Other
The City is requesting to sole source multiple EV ARC units manufactured by Beam Global as there is no comparable competitive product. The stand-alone EV ARC unit is mounted with a solar array and equipped with EV chargers and an emergency power panel. The unit generates clean energy to power the chargers or equipment plugged into the panel. When not in use, the energy is stored in a 22kWh battery that is mounted on the unit. The unit is not anchored to the ground or connected to any utilities so it can be picked up and redeployed to another location. No other product provides a similar energy storage capacity and is as rapidly deployable, transportable, and grid independent.

For Purchasing Division Use Only Below This Line
I have conducted a good faith review of available products and sources and have made the following determination:

Buyer ___________________________
Attachment 1

Page 26 of 28 ends

Rapidly Scalable No Permits,
No Construction
Charge 24/7: Night,
Rain, Grid Failures
Any Brand Charger,
Pre-Mounted
EV ARC™ 2020
The EV ARC™ 2020 is the only rapidly deployed, transportable but permanent, EV charging solution. Grid independent and 100% sustainable, it deploys in minutes without permitting, construction or electrical work.

It will charge electric vehicles with the EV charger of your choice, even during grid failures. You’ll never get a utility bill.

Sustainable EV Charging
The EV ARC tracks the sun and generates and
stores all of its own electricity. It fits inside a
standard parking space and because vehicles
easily park on it you won’t lose a single spot.

Reaching as many as 12 vehicles, it can charge
up to six EVs at the same time. Use it day or night
and during periods o
f inclement weather.

Join organizations across the U.S. like Google,
New York City and Caltrans who are Driving
on Sunshine.

EV Charging Deployed in Minutes Not Months
BeamForAll.com [email protected]
Attachment 1

Page 27 of 28 ends

Mechanical
Array Dimensions (LxW) 21 x 10.6 ft
Max Height 15.3 ft
Min Clearance 9 ft
Base-Pad Footprint (LxW) 18 x 7.5 ft
Weight
5 <12,500 lbs
Surface Loading 6 8.14 psi
Standard Shipping Methods ARC Mobility™ Trailer/ Truck & Trailer / Shipping Container
Transformer ARC Stowed
Shipping Size (LxWxH) 7
18 x 7.5 x 7.6 ft
Performance
Solar Array 4.3 kW
Daily Range Delivered 1 Up to 265 e-miles
Battery Storage Options 22,32,43 kWh
Total EV Charger Power 2 Up to 4.3 kW
EV Charger Type 3, 4 Any brand; 1-6 plugs;
type J1772
Certified Wind Load 120 mph
Major Component Ratings
(Inverter) UL1741-2010/2018, IEEE1547a-2003/2014, FCC 15 class B, UL1741SA, CA Rule 21, HECO Rule 14H;
(Solar Panels) UL 1703, IEC 61215, IEC 61730;
(Battery) UL1642, BMS and Components Demonstrated
to UL2271; (EVSE) UL2594 UL2231
The EV ARC™ 2020 is off-grid so generates no utility bill and can charge EVs during power outages.

It provides emergency power for first responders, is wind-rated to 120mph, flood-proof to 9.5’ and ADA compliant. Units are deployed in minutes by a Beam Deployment Expert and require zero contact.

5. Exact weight varies based on EV ARC™ model and options

6. Pressure calculated by weight distributed over 8in x 24in anti-skid pads

7. Enables domestic and international shipping on a standard flatbed trailer or shipping container

1. Range will vary based on local conditions

2. Actual total output power depends on EV model and charger model

3. Supports a variety of quality EV chargers that come pre-mounted. 4: Power may be reduced based on number of circuits, EV model and charger model.

Vital Energy When and Where You Need It
EV ARC™ 2020 Specifications
Drive on Sunshine
Fastest Deployed Lowest TCOMost Scalable
Get the Charger Brand You Want
BeamForAll.com [email protected]
v1.4
Attachment 1

Page 28 of 28 ends