06/21/22 Bid Summary
IFB PW22-01 Rehabilitation of Storm Drain Outfall at Remington Court Project No. UY-17-01
Item Description QTY UNIT Unit Price Total Unit Price Total 1 Mobilization (Recommend not to exceed 5% of Total Base Bid) 1 LS 13,500.00$ 13,500.00$ 20,000.00$ 20,000.00$ 2 Compliance with CEQA and Regulatory Permits 1 LS 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 3 Temporary Tree Protection 1 LS 10,000.00$ 10,000.00$ 34,900.00$ 34,900.00$ 4 Clearing and Grubbing 1 LS 20,000.00$ 20,000.00$ 76,800.00$ 76,800.00$ 5 Construction Access Ramp 1 LS 18,600.00$ 18,600.00$ 29,400.00$ 29,400.00$ 6 Tree Removal (<18”) 3 EA 6,000.00$ 18,000.00$ 14,167.00$ 42,501.00$ 7 Channel Excavation 200 CY 250.00$ 50,000.00$ 445.00$ 89,000.00$ 8 Dewatering and Flow Bypass 1 LS 28,600.00$ 28,600.00$ 6,600.00$ 6,600.00$ 9 Outfall Protection 1,500 SF 74.00$ 111,000.00$ 66.00$ 99,000.00$ 10 Erosion Control 1 LS 4,600.00$ 4,600.00$ 25,600.00$ 25,600.00$ 11 Revegetation 1 LS 6,100.00$ 6,100.00$ 48,600.00$ 48,600.00$ 12 Relocation of California Red-legged Frog and Western Pond Turtle (Revocable) 1 LS 3,200.00$ 3,200.00$ 28,000.00$ 28,000.00$ 313,600.00$ 530,401.00$
Surety
License
10% Bid Bond 10% Bid Bond
A, C-21, Haz A
Total Base Bid
Brannon Corporation GSW Construction, Inc.
10492 Dougherty Avenue
Morgan Hill, CA 95037
Keith Dorsa
101 The Embarcadero, Suite 123
San Francisco, CA 94105
Gary Silveria
Attahcment 1

Page 1 of 1 ends