Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Recommend Not to Exceed 5% of
Total Base Bid)
1 LS
14,000.00$ 14,000.00$ 14,800.00$ 14,800.00$ 18,000.00$ 18,000.00$ 2 Construction Staking 1 LS 3,000.00$ 3,000.00$ 3,600.00$ 3,600.00$ 12,000.00$ 12,000.00$ 3 Remove Striping by Grinding 1395 LF 4.60$ 6,417.00$ 4.50$ 6,277.50$ 4.00$ 5,580.00$ 4 Remove Stop Legend by Grinding 1 EA 92.00$ 92.00$ 87.00$ 87.00$ 90.00$ 90.00$ 5 Remove Turn Arrow by Grinding 1 EA 92.00$ 92.00$ 87.00$ 87.00$ 90.00$ 90.00$ 6 Remove Sign 8 EA 28.00$ 224.00$ 115.00$ 920.00$ 120.00$ 960.00$ 7 Remove Sign and Post 2 EA 50.00$ 100.00$ 173.00$ 346.00$ 180.00$ 360.00$ 8 Pavement Section Excavation 73 CY 130.00$ 9,490.00$ 105.00$ 7,665.00$ 200.00$ 14,600.00$ 9 Remove Concrete Curb and Gutter 219 LF 20.00$ 4,380.00$ 28.00$ 6,132.00$ 62.00$ 13,578.00$ 10 Remove Concrete Sidewalk 1192 SF 12.00$ 14,304.00$ 11.00$ 13,112.00$ 12.00$ 14,304.00$ 11 Remove and Reinstall Chain-link Fence 1 LS 2,060.00$ 2,060.00$ 1,000.00$ 1,000.00$ 4,000.00$ 4,000.00$ 12 Finished Grading 3144 SF 4.00$ 12,576.00$ 2.00$ 6,288.00$ 8.00$ 25,152.00$ 13 Retrofit Existing Storm Drain Inlet into Manhole
with New Solid ADA Cover
1 EA 5,000.00$ 5,000.00$ 3,500.00$ 3,500.00$ 6,700.00$ 6,700.00$ 14 Adjust Existing Traffic Box to Grade 2 EA 560.00$ 1,120.00$ 400.00$ 800.00$ 400.00$ 800.00$ 15 Traffic Control and Construction Signage 1 LS 43,551.00$ 43,551.00$ 33,801.00$ 33,801.00$ 59,545.00$ 59,545.00$ 16 Install 24" Advanced Limit Line 25 LF 23.00$ 575.00$ 16.00$ 400.00$ 17.00$ 425.00$ 17 Install New Stop Legend Pavement Marking 1 EA 138.00$ 138.00$ 173.00$ 173.00$ 180.00$ 180.00$ 18 Install Continental Crosswalk 87 LF 23.00$ 2,001.00$ 16.00$ 1,392.00$ 16.00$ 1,392.00$ 19 Install Detail 22 Per Caltrans Standard Plan A20A 494 LF 4.60$ 2,272.40$ 4.00$ 1,976.00$ 4.00$ 1,976.00$ 20 Install Detail 39 Per Caltrans Standard Plan
A20D
2,888 LF 2.20$ 6,353.60$ 2.25$ 6,498.00$ 2.00$ 5,776.00$ 21 Install Detail 39A Per Caltrans Standard Plan
A20D
108 LF 2.20$ 237.60$ 1.75$ 189.00$ 2.00$ 216.00$ Redgwick Construction
21 Hegendberger Ct.
Oakland, CA 94621
Bob Rahebi
Golden Bay Construction, Inc.
3826 Depot Rd
Hayward, CA 94545
Johnny Zanette
FBD Vanguard Construction, Inc.
550 Greenville Rd.
Livermore, CA 94550
Billie Sposeto
Attachment 1
Bid Summary
IFB
PW22-10 Lawrence Station Area Sidewalks and
Bicycle Facilities
Project # TR-18-02, Federal Aid No. CML-5213
(066)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Bob RahebiJohnny ZanetteBillie Sposeto
22 Install 6" Dashed Stripe And 8" Diagonal Bike
Buffer Striping
1,198 LF 4.60$ 5,510.80$ 2.75$ 3,294.50$ 3.00$ 3,594.00$ 23 Install 8" White Diagonal Thermoplastic Striping
Spaced 10' on Center
59 LF 7.90$ 466.10$ 2.75$ 162.25$ 3.00$ 177.00$ 24 Install 25 Mph Pavement Marking 1 EA 92.00$ 92.00$ 86.00$ 86.00$ 90.00$ 90.00$ 25 Install Bike Lane Marking 10 EA 138.00$ 1,380.00$ 115.00$ 1,150.00$ 120.00$ 1,200.00$ 26 Install Yield Line Per Caltrans Standard Plan
A20E
15 LF 9.25$ 138.75$ 5.75$ 86.25$ 6.00$ 90.00$ 27 Install Type III Arrow Per Caltrans Standard Plan
A24B
1 LS 283.00$ 283.00$ 338.00$ 338.00$ 350.00$ 350.00$ 28 Install Blue Fire Hydrant Marker 3 LS 29.00$ 87.00$ 23.00$ 69.00$ 25.00$ 75.00$ 29 Install R1-5 Yield to Pedestrians Sign on New
Post
1 LF 550.00$ 550.00$ 460.00$ 460.00$ 450.00$ 450.00$ 30 Install Custom Combination R26/R81 Sign on
New Post
4 EA 550.00$ 2,200.00$ 460.00$ 1,840.00$ 450.00$ 1,800.00$ 31 Install Custom Combination R26/R81 Sign 10 SF 360.00$ 3,600.00$ 259.00$ 2,590.00$ 260.00$ 2,600.00$ 32 Install R81 Sign and Custom "Bikes Wrong Way"
On New Post Per COS Std Dwg. 4E-1
2 SF 550.00$ 1,100.00$ 460.00$ 920.00$ 450.00$ 900.00$ 33 Install 12" White Thermoplastic Crosswalk 134 EA 12.00$ 1,608.00$ 8.00$ 1,072.00$ 8.00$ 1,072.00$ 34 Install W11-2 "Pedestrian Crossing," W16-7P,
R81 (CA) and R81B (CA) "Bike Lane End" Signs
on New Post
1 EA 600.00$ 600.00$ 690.00$ 690.00$ 700.00$ 700.00$ 35 Install W11-2 and W16-9P "Pedestrian Crossing
Ahead" Signs on New Post Per MUTCD
1 SF 550.00$ 550.00$ 575.00$ 575.00$ 550.00$ 550.00$ 36 Install Slurry Seal 42,530 LF 0.90$ 38,277.00$ 1.00$ 42,530.00$ 0.90$ 38,277.00$ 37 Roadway Prep. (Crack Treatments) 1 LF 9,500.00$ 9,500.00$ 9,890.00$ 9,890.00$ 12,000.00$ 12,000.00$ 38 Install Street Name Signs and R1-1 Stop Sign on
New Post
1 LF 600.00$ 600.00$ 690.00$ 690.00$ 600.00$ 600.00$ 39 Install Asphalt Concrete Deeplift 831 LF 36.00$ 29,916.00$ 38.00$ 31,578.00$ 25.00$ 20,775.00$ 40 Install Concrete Sidewalk 1,927 EA 12.00$ 23,124.00$ 16.00$ 30,832.00$ 24.00$ 46,248.00$ 41 Install 13C-1 Curb Ramp 3 EA 2,000.00$ 6,000.00$ 4,236.00$ 12,708.00$ 5,200.00$ 15,600.00$ 42 Install Type II Curb and Gutter 243 EA 45.00$ 10,935.00$ 65.00$ 15,795.00$ 100.00$ 24,300.00$ 43 Install Truncated Domes 72 LS 35.00$ 2,520.00$ 45.00$ 3,240.00$ 68.00$ 4,896.00$ 44 Install Storm Drain Inlet 2 LS 4,800.00$ 9,600.00$ 8,140.00$ 16,280.00$ 7,800.00$ 15,600.00$ Attachment 1
Bid Summary
IFB
PW22-10 Lawrence Station Area Sidewalks and
Bicycle Facilities
Project # TR-18-02, Federal Aid No. CML-5213
(066)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Bob RahebiJohnny ZanetteBillie Sposeto
45 Install 12" RCP Class IV Storm Drainpipe 47 LF 325.00$ 15,275.00$ 352.00$ 16,544.00$ 385.00$ 18,095.00$ 46 Adjust AT&T Telecommunications Vault Cover to
Grade (revocable) 1 LS 1,380.00$ 1,380.00$ 850.00$ 850.00$ 1,100.00$ 1,100.00$ Bid Total 293,276.25$ 303,313.50$ 396,863.00$ A1 Trucking
SVS, Inc. Trucking Bond Blacktop,
Inc Crack fill & Slurry Bond Black Top Slurry & Crack
Seal
Bond Blacktop,
Inc.
Crack Treatment
& Slurry Seal
Bayside Stripe &
Seal Triping & Signs Luminart
Concrete Concrete
Chrisp Company Striping & Signs S+S Trucking Trucking Bayside Stripe & Seal Striping & Sign
10% Bid Bond
A
10% Bid Bond
A, B, C8, C10, C12, C31
Surety 10% Bid Bond
A, B, C-8