Project: 825340 - Street Lights Conduit Replacement
Project Description/Scope/Purpose:
This project provides funding for replacement of damaged conduits, wiring, and other related components throughout the City on an as-needed basis as problems are identified by staff. Many of the City’s streetlights have underground conduits that have been in place for many years and are showing deterioration. Failures are generally the result of tree roots, contractors damaging them, the age of the conduits, or by water intrusion creating electrical shorts. The budget is based upon using either in-house staff on overtime or contractors to repair or replace various damaged conduit in FY 2019/20.
Five segments of conduit will be replaced in FY 2021/22 with design completed in FY 2020/21. The segments include:
- The overhead lighting conduit on the two pedestrian bridges along Borregas Ave crossing HWY237 and HWY101. - Approximately 1,000 ft of conduit along East Arques Ave between North Wolfe Rd and Santa Fe Terrance. - Approximately 400 ft of conduit along North Fair Oaks Ave from East Arques Ave to East California Ave. - Approximately 300 ft of conduit surrounding the intersection of Reamwood Ave and Elko Dr.
Future locations will be based upon damaged locations identified over the next three-year period, except for small spot repairs that can be corrected with the small annual budget referenced above.
Fiscal Impact:
This project is funded by the Gas Tax Fund.
Project Type: Traffic and Transportation
Year Identified: 2006
Est. Completion Year: Ongoing
The alternative to this project would be to not fix broken conduits, which would result in dark streets. Hazardous situations could occur if the conduit breaks in such a way that a street light pole is energized; however, this is not a very common occurrence.
Project Evaluation and Analysis:
Category: Infrastructure
Project Coordinator: Jim Burch
Department: 250 - Public Works Fund - Sub-Fund:
Funding Sources:
Gas Tax Fund
Plans and Goals:
Project Phase: Underway
Project Manager: Austin Bondy-Villa
LT - Land Use and Transportation - LT-2: Environmentally Sustainable Land Use & Transportation Planning and Development
Project Financial Summary
20 Year Total
Grand Total
Prior Actual
2020 - 21
Operating CostsProject Costs
498,211
Revenues
-
Transfers In
466,374 -
- 354,560
560,949
12,799
13,446
282,528
14,841
15,592
334,078
16,872
17,726
374,432
19,564
20,556
457,438
22,689
23,837
517,175
26,311
27,643
565,132
29,302
3,352,911
4,205,682
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
354,559
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
820,934
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2021 - 22
2022 - 23
2023 - 24
2024 - 25
2025 - 26
2026 - 27
2027 - 28
2028 - 29
2029 - 30
2030 - 31
2031 - 32
2032 - 33
2033 - 34
2034 - 35
2035 - 36
2036 - 37
2037 - 38
2038 - 39
2039 - 40
2040 - 41
3201 - General Fund Assets
ATTACHMENT 3