Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Recommend Not to Exceed 5% of Total
Base Bid) 1 LS 160,500.00$ 124,800.00$ 134,300.00$ 63,000.00$ 2 Locate Utilities Via Potholing 1 LS 8,000.00$ 10,000.00$ 36,000.00$ 5,500.00$ 3 Construction Staking 1 LS 11,300.00$ 12,240.00$ 11,200.00$ 15,000.00$ 4 Traffic Control System 1 LS 479,779.00$ 98,014.00$ 203,700.00$ 95,000.00$ 5 Clearing and Grubbing 1 LS 27,000.00$ 23,000.00$ 82,900.00$ 80,000.00$ 6 Monument Preservation & Re-establishment 1 LS 3,400.00$ 1,000.00$ 2,100.00$ 14,000.00$ 7 Pavement Section Excavation 374 CY 180.00$ 67,320.00$ 180.00$ 67,320.00$ 170.00$ 63,580.00$ 232.00$ 86,768.00$ 8 Finished Grading 2,000 SY 28.00$ 56,000.00$ 1.00$ 2,000.00$ 12.00$ 24,000.00$ 9.00$ 18,000.00$ 9 Remove Concrete Curb & Gutter 1,150 LF 20.00$ 23,000.00$ 30.00$ 34,500.00$ 38.00$ 43,700.00$ 32.00$ 36,800.00$ 10 Remove Concrete Curb / Median 345 LF 20.00$ 6,900.00$ 30.00$ 10,350.00$ 40.00$ 13,800.00$ 32.00$ 11,040.00$ 11 Remove Concrete 5,635 SF 14.00$ 78,890.00$ 7.00$ 39,445.00$ 9.00$ 50,715.00$ 10.00$ 56,350.00$ 12 Remove Sign & Post 8 EA 575.00$ 4,600.00$ 65.00$ 520.00$ 140.00$ 1,120.00$ 200.00$ 1,600.00$ 13 Remove and Replace Existing White Picket Fence 32 LF 236.00$ 7,552.00$ 100.00$ 3,200.00$ 148.00$ 4,736.00$ 195.00$ 6,240.00$ 14 Adjust City Sanitary Sewer Manhole Cover to
Grade 1 EA 5,970.00$ 5,970.00$ 1,300.00$ 1,300.00$ 1,800.00$ 1,800.00$ 2,400.00$ 2,400.00$ 15 Adjust City Storm Drain Manhole to Grade 1 EA 5,970.00$ 5,970.00$ 1,300.00$ 1,300.00$ 1,800.00$ 1,800.00$ 2,400.00$ 2,400.00$ 16 Relocate City Water Valve 1 EA 6,650.00$ 6,650.00$ 1,680.00$ 1,680.00$ 2,600.00$ 2,600.00$ 2,000.00$ 2,000.00$ 17 Relocate City Fire Hydrant 1 EA 7,210.00$ 7,210.00$ 5,700.00$ 5,700.00$ 22,100.00$ 22,100.00$ 30,000.00$ 30,000.00$ 18 Remove and Relocate City Storm Drain Catch
Basin 1 EA 15,500.00$ 15,500.00$ 11,000.00$ 11,000.00$ 10,200.00$ 10,200.00$ 13,000.00$ 13,000.00$ 19 Adjust City Drain Inlet to Grade 3 EA 434.00$ 1,302.00$ 1,200.00$ 3,600.00$ 4,800.00$ 14,400.00$ 4,000.00$ 12,000.00$ 20 Adjust Irrigation Equipment to Grade (Service) 1 LS 16,770.00$ 5,000.00$ 10,200.00$ 15,000.00$ 21 Retrofit Existing City Storm Drain inlet to Storm
Drain Manhole 1 EA 6,800.00$ 6,800.00$ 3,200.00$ 3,200.00$ 5,800.00$ 5,800.00$ 4,500.00$ 4,500.00$ 22 Remove Tree, Stump and Roots 4 EA 2,217.00$ 8,868.00$ 3,000.00$ 12,000.00$ 2,600.00$ 10,400.00$ 4,500.00$ 18,000.00$ 23 Temporary Erosion Control 1 LS 16,600.00$ 5,000.00$ 16,800.00$ 12,000.00$ PAVING & CONCRETE -$
24 Hot Mix Asphalt 262 TON 775.00$ 203,050.00$ 250.00$ 65,500.00$ 340.00$ 89,080.00$ 400.00$ 104,800.00$ 25 Class II Aggregate Base 185 TON 50.00$ 9,250.00$ 110.00$ 20,350.00$ 185.00$ 34,225.00$ 130.00$ 24,050.00$ 26 6" Vertical Curb (24” Gutter Pan) 1075 LF 45.00$ 48,375.00$ 73.00$ 78,475.00$ 98.00$ 105,350.00$ 76 81,700.00$ 27 6" Vertical Curb (12” Gutter Pan) 120 LF 40.00$ 4,800.00$ 73.00$ 8,760.00$ 88.00$ 10,560.00$ 76 9,120.00$ 28 6" Vertical Curb (Type I-6) 20 LF 35.00$ 700.00$ 73.00$ 1,460.00$ 171.00$ 3,420.00$ 62 1,240.00$ 29 6" Vertical Curb (Type IV-6) 40 LF 300.00$ 12,000.00$ 73.00$ 2,920.00$ 118.00$ 4,720.00$ 71 2,840.00$ 30 Retaining Curb 190 LF 40.00$ 7,600.00$ 150.00$ 28,500.00$ 94.00$ 17,860.00$ 100 19,000.00$ 31 Concrete Sidewalk 6,885 SF 17.00$ 117,045.00$ 17.00$ 117,045.00$ 18.00$ 123,930.00$ 20 137,700.00$ 32 Vehicular Concrete 25 SF 20.00$ 500.00$ 21.00$ 525.00$ 73.00$ 1,825.00$ 32 800.00$ 33 PCC Curb Ramp - 13C-1 (With Truncated Domes) 19 EA 4,500.00$ 85,500.00$ 3,200.00$ 60,800.00$ 5,800.00$ 110,200.00$ 4600 87,400.00$ 34 PCC Curb Ramp - 13C-2 (With Truncated Domes) 2 EA 5,750.00$ 11,500.00$ 3,200.00$ 6,400.00$ 7,200.00$ 14,400.00$ 4600 9,200.00$ 35 Driveway - 6C-3 119 SF 20.00$ 2,380.00$ 21.00$ 2,499.00$ 58.00$ 6,902.00$ 28 3,332.00$ 36 Storm Drain Inlet 2 EA 11,500.00$ 23,000.00$ 11,000.00$ 22,000.00$ 8,100.00$ 16,200.00$ 4600 9,200.00$ 37 12" Storm Drain Pipe 55 LF 171.00$ 9,405.00$ 231.00$ 12,705.00$ 300.00$ 16,500.00$ 260 14,300.00$ 38 Relocate 6” Fire Water Ductile Iron Pipe (DIP) 10 LF 665.00$ 6,650.00$ 1,050.00$ 10,500.00$ 201.00$ 2,010.00$ 310 3,100.00$ 39 Bus Stop Bench 2 EA 4,600.00$ 9,200.00$ 4,500.00$ 9,000.00$ 2,400.00$ 4,800.00$ 7500 15,000.00$
STORMWATER MANAGEMENT AREA
40 Storm Drain Overflow Inlet 1 EA 5,900.00$ 5,900.00$ 3,000.00$ 3,000.00$ 2,400.00$ 2,400.00$ 8500 8,500.00$ 41 Storm Drain Connection 1 EA 1,550.00$ 1,550.00$ 1,100.00$ 1,100.00$ 2,100.00$ 2,100.00$ 3000 3,000.00$ 42 Storm Drain Bioretention Cleanout 2 EA 1,700.00$ 3,400.00$ 600.00$ 1,200.00$ 280.00$ 560.00$ 1800 3,600.00$ 43 6” Storm Drain Perforated Pipe 70 LF 80.00$ 5,600.00$ 150.00$ 10,500.00$ 40.00$ 2,800.00$ 65 4,550.00$ 44 Thru-Curb Storm Drain Inlet 2 EA 1,650.00$ 3,300.00$ 1,200.00$ 2,400.00$ 2,100.00$ 4,200.00$ 4600 9,200.00$ 45 Energy Dissipating Rock Mulch 1 LS 550.00$ 1,000.00$ 500.00$ 1,600.00$ 46 Install/Modify Irrigation System (Service) 2,850 SF 10.75$ 30,637.50$ 11.50$ 32,775.00$ 11.00$ 31,350.00$ 14.00$ 39,900.00$ 47 Soil Amendments 2,850 SF 0.30$ 855.00$ 0.35$ 997.50$ 0.30$ 855.00$ 2.00$ 5,700.00$ 48 Earthwork 1 LS 11,450.00$ 109,800.00$ 48,100.00$ 35,000.00$ 49 Meter and Backflow (Service) 1 LS 5,210.00$ 5,800.00$ 12,800.00$ 12,000.00$ 50 Landscaping 3,595 SF 2.10$ 7,549.50$ 2.25$ 8,088.75$ 2.00$ 7,190.00$ 4.00$ 14,380.00$ 51 Bioretention Area 1,015 SF 66.00$ 66,990.00$ 26.00$ 26,390.00$ 21.00$ 21,315.00$ 31.00$ 31,465.00$ 52 Bark Mulch 1 LS 4,300.00$ 4,600.00$ 4,100.00$ 16,000.00$ 53 90 Day Establishment Warranty 1 LS 6,600.00$ 6,600.00$ 6,100.00$ 4,500.00$
TRAFFIC SIGNAL
54 Traffic Signal and Lighting System Modification (N.
Wolfe Road and Stewart Drive) 1 LS 798,100.00$ 799,616.00$ 738,100.00$ 988,600.00$ 55 Traffic Signal and Lighting System Modification
(DeGuigne Drive and E. Duane Avenue) 1 LS 14,400.00$ 9,211.00$ 13,200.00$ 17,850.00$
ELECTRICAL
56 Street Light Pole Removal and Installation 2 EA 15,000.00$ 30,000.00$ 6,908.00$ 13,816.00$ 13800 27,600.00$ 18,500.00$ 37,000.00$ 57 Pedestrian Crossing (E. Duane Avenue and
Duane Court) 1 LS 144,100.00$ 153,130.00$ 141,700.00$ 178,500.00$ 58 Pedestrian Crossing (E. Duane Avenue and San
Simeon Street) 1 LS 48,000.00$ 56,416.00$ 46,800.00$ 59,000.00$ 59 Pedestrian Crossing (E. Duane Court and Santa
Ynez Street) 1 LS 74,000.00$ 92,108.00$ 72,800.00$ 92,000.00$
STRIPING
60 Signing and Striping 1 LS 181,000.00$ 255,128.00$ 142,700.00$ 238,000.00$ 61 Crack Seal 1 LS 24,000.00$ 24,955.00$ 21,800.00$ 31,000.00$ 62 Type II Slurry Seal 25,575 SY 4.88$ 124,806.00$ 5.00$ 127,875.00$ 4.80$ 122,760.00$ 6.10$ 156,007.50$ 63 Type III Slurry Seal 22,585 SY 5.27$ 119,022.95$ 5.45$ 123,088.25$ 5.20$ 117,442.00$ 6.10$ 137,768.50$ TOTAL BASE BID 3,288,156.95$ 2,793,202.50$ 2,919,205.00$ 3,248,501.00$ Surety
Primary License
Sub Contractor
Columbia Electric Inc.R.H. Concrete Inc.
Marina Landscape Inc.
Bear Electrical Solutions Inc. Graham Contractors Inc.
All Cities Trucking Services Inc.
Chrisp Contracting inc.
Graham Contractors Inc.
Chrisp Contracting Inc.
Graham Contractors Inc.
Chrisp Contracting inc.
Benchmark Engineering Inc.
pipe-Net, Inc.
Graham Contractors Inc.
Lonestar Landscape Inc.
Marina Landscape Inc.
Chrisp Contracting inc.
Marina Landscape Inc.
Silva Engineering Construction Inc. Mountain F. Enterprises Benchmark Engineering Inc.
Sposeto Engineering Inc.
4558 Contractors Place
Livermore, CA 94551
John Sposeto
10% Bid Bond
Class A
10% Bid Bond
Class A
Columbia Electric Inc.
10% Bid Bond 10% Bid Bond
Class A Class A
Columbia Electric Inc.
DEMOLITION & SITE PREPARATION
Billie Sposeto
3826 Depot Rd
Haayward, CA 94545
Johnny Zanette
21 Hegenberger Ct,
Oakland, CA 94621
Travis Miller
FB Vanguard Construction Inc. Golden Bay Construction, Inc. Redgewick Construction Inc. 550 Greenville Road
Livermore, CA 94550
ATTACHMENT 1