10/24/2022 Bid Summary
IFB
PW23-05 Active Transportation Program - Safe Route
to School
Project No. TR-18-05
Item Description QTY UNIT
1 Mobilization (Recommend Not to Exceed 5% of Total Base Bid)1 LS 125,000.00$ 130,000.00$ 130,000.00$ 102,000.00$ 140,000.00$ 2 Traffic Control and Public Convenience 1 LS 225,000.00$ 273,643.00$ 140,000.00$ 192,000.00$ 370,000.00$ 3 Water Pollution Control Program 1 LS 25,000.00$ 5,000.00$ 6,520.00$ 17,500.00$ 10,500.00$ 4 Clear and Grub 1 LS 28,500.00$ 10,000.00$ 45,000.00$ 37,000.00$ 29,000.00$ 5 Concrete and Roadway Excavation 1 LS 267,300.00$ 215,000.00$ 220,000.00$ 364,000.00$ 380,000.00$ 6 Install Curb Ramp (City Std Detail 13C-1) 9 EA 6,700.00$ 60,300.00$ 2,600.00$ 23,400.00$ 6,500.00$ 58,500.00$ 3,600.00$ 32,400.00$ 4,500.00$ 40,500.00$ 7 Install Type II-6 Curb and Gutter 967 LF 140.00$ 135,380.00$ 88.00$ 85,096.00$ 90.00$ 87,030.00$ 86.00$ 83,162.00$ 47.00$ 45,449.00$ 8 Install Type I-6 Curb and Gutter 21 LF 147.00$ 3,087.00$ 56.00$ 1,176.00$ 160.00$ 3,360.00$ 72.00$ 1,512.00$ 40.00$ 840.00$ 9 Install Driveway 4,713 SF 32.00$ 150,816.00$ 17.00$ 80,121.00$ 35.00$ 164,955.00$ 17.00$ 80,121.00$ 14.00$ 65,982.00$ 10 Install Concrete Sidewalk 7,052 SF 21.00$ 148,092.00$ 14.00$ 98,728.00$ 28.00$ 197,456.00$ 15.50$ 109,306.00$ 11.00$ 77,572.00$ 11 Install Hot Mix Asphalt (Type A) 728 TON 287.00$ 208,936.00$ 355.00$ 258,440.00$ 250.00$ 182,000.00$ 336.00$ 244,608.00$ 401.00$ 291,928.00$ 12 Base Failure Repair (Digouts) 371 TON 315.00$ 116,865.00$ 400.00$ 148,400.00$ 600.00$ 222,600.00$ 548.00$ 203,308.00$ 454.00$ 168,434.00$ 13 Replace Unsuitable Subgrade (Revocable) 190 CY 100.00$ 19,000.00$ 220.00$ 41,800.00$ 186.00$ 35,340.00$ 157.00$ 29,830.00$ 380.00$ 72,200.00$ 14 Slurry Seal 21,754 SY 6.00$ 130,524.00$ 5.00$ 108,770.00$ 6.00$ 130,524.00$ 5.50$ 119,647.00$ 5.00$ 108,770.00$ 15 Remove Drain Inlet 1 EA 1,300.00$ 1,300.00$ 2,300.00$ 2,300.00$ 3,000.00$ 3,000.00$ 1,800.00$ 1,800.00$ 47.00$ 47.00$ 16 Modify Drain Inlet 1 EA 4,500.00$ 4,500.00$ 3,900.00$ 3,900.00$ 4,500.00$ 4,500.00$ 4,200.00$ 4,200.00$ 5,000.00$ 5,000.00$ 17 Install Drain Inlet 2 EA 8,500.00$ 17,000.00$ 7,500.00$ 15,000.00$ 6,500.00$ 13,000.00$ 5,600.00$ 11,200.00$ 6,700.00$ 13,400.00$ 18 Install Area Drain 5 EA 3,400.00$ 17,000.00$ 6,000.00$ 30,000.00$ 4,000.00$ 20,000.00$ 4,600.00$ 23,000.00$ 3,400.00$ 17,000.00$ 19 Install 12” Drainage Pipe 244 LF 160.00$ 39,040.00$ 328.00$ 80,032.00$ 260.00$ 63,440.00$ 262.00$ 63,928.00$ 294.00$ 71,736.00$ 20 Adjust Utility to Grade (Public) 16 EA 750.00$ 12,000.00$ 850.00$ 13,600.00$ 750.00$ 12,000.00$ 800.00$ 12,800.00$ 2,360.00$ 37,760.00$ 21 Install 5-Gallon Shrub 246 EA 75.00$ 18,450.00$ 74.00$ 18,204.00$ 65.00$ 15,990.00$ 82.00$ 20,172.00$ 72.00$ 17,712.00$ 22 Install 2-3’ Surface Select Field Stone/Boulder 40 EA 298.00$ 11,920.00$ 295.00$ 11,800.00$ 258.00$ 10,320.00$ 323.00$ 12,920.00$ 285.00$ 11,400.00$ 23 Install 3-4’ Surface Select Field Stone/Boulder 18 EA 750.00$ 13,500.00$ 800.00$ 14,400.00$ 700.00$ 12,600.00$ 877.00$ 15,786.00$ 775.00$ 13,950.00$ 24 Install 3” Depth Organic Waste Mulch 2,858 SF 1.50$ 4,287.00$ 4.00$ 11,432.00$ 1.50$ 4,287.00$ 2.00$ 5,716.00$ 1.60$ 4,572.80$ 25 Install 3” Depth Decomposed Granite Mulch 3,058 SF 4.00$ 12,232.00$ 6.00$ 18,348.00$ 4.00$ 12,232.00$ 5.00$ 15,290.00$ 4.40$ 13,455.20$ 26 Install 3” Depth Rock Mulch 228 SF 8.00$ 1,824.00$ 9.00$ 2,052.00$ 7.00$ 1,596.00$ 8.00$ 1,824.00$ 8.00$ 1,824.00$ 27 Install Weed Barrier 228 SF 1.40$ 319.20$ 1.25$ 285.00$ 1.20$ 273.60$ 1.50$ 342.00$ 2.00$ 456.00$ 28 Install Aluminum Edger 950 LF 14.00$ 13,300.00$ 13.00$ 12,350.00$ 12.00$ 11,400.00$ 15.00$ 14,250.00$ 13.00$ 12,350.00$ 29 Furnish and Install Irrigation System (Complete) 1 LS 110,000.00$ 198,000.00$ 97,500.00$ 165,950.00$ 98,000.00$ 30 Provide Plan Establishment and Maintenance Period (180 Days)1 LS 10,000.00$ 9,000.00$ 8,000.00$ 10,000.00$ 8,800.00$ 31 Traffic Signal (Mathilda) 1 LS 635,000.00$ 660,000.00$ 698,000.00$ 698,000.00$ 630,000.00$ 32 Traffic Signal (Borregas) 1 LS 66,200.00$ 75,000.00$ 192,000.00$ 95,000.00$ 73,000.00$ 33 Signing and Striping 1 LS 139,000.00$ 205,000.00$ 137,150.00$ 172,000.00$ 152,000.00$ 34 Monuments and Benchmarks 1 LS 6,500.00$ 2,000.00$ 10,000.00$ 34,000.00$ 6,000.00$ Bid Total 2,777,172.20$ 2,862,277.00$ 2,950,573.60$ 2,994,572.00$ 2,989,638.00$ Surety
License
Sub Contractor Marina
Landscaping
Landscaping &
Irrigation
Columbia
Electric, Inc. Electrical Chrisp Company Signing & Striping Graham Contractors, Inc. Slurry Seal Chrisp Company Striping & Signage Pavement
Coating Slurry Seal Graham
Contractors, Inc Slurry Seal Dirt Hauling Trucking (Partial) Marina Landscape, Inc.

Landscape &
Irrigation
Ronan
Construction,
Inc.

Base Failure
Repair &
Mobilization
FBD Vanguard
550 Greenville Rd
Livermore, CA 94550
Barbara Welch
10%
Ray's Electric
411 Pendleton Way, Suite B
Oakland, CA 94621
Greg Gruendl
10%
A & C10
21 Hegenberger Ct.

Oakland, CA 94621
Bob Rahebi
10%
A, Haz
Sposeto Engineering, Inc.*
4558 Contractors Place
Livermore, CA 94551
John Sposeto
10%
A
Golden Bay Construction, Inc.
3826 Depot RD
Hayward, CA 94545
Johnny Zanette
10%
A
Redgwick Construction Co.

Attachment 1

Page 1 of 2 ends

10/24/2022 Bid Summary
IFB
PW23-05 Active Transportation Program - Safe Route
to School
Project No. TR-18-05
Item Description QTY UNIT
Barbara WelchGreg GruendlBob Rahebi John SposetoJohnny Zanette Chrisp Company Striping & Signs Chrisp Company Striping Graham Contractors Slurry Seal QA Constructors AC Paving Marina Landscape, Inc.

Landscape &
Irrigation
JJR
Construction Concrete Marina
Landscape, Inc. Landscape CMC Traffic
Control
Traffic Control
(Partial) Chrisp Company Striping &
Signage
Graham
Contractors, Inc. Slurry Seal
Columbia
Electric, Inc. Electrical
Bendmark
Engineering Survey Benchmark
Engieering, Inc. Survey St Francis
Electric LLC Traffic Control
Marina
Landsape Landscape St Francis Electric Electrical
Appian UDBE

SWPPP WPCP
Pavement
Recycling
Systems
Grinding
*Bid submitted by Sposeto Engineering, Inc. contains a math error in the bid total. The accurate bid amount is shown.

Attachment 1

Page 2 of 2 ends