RESOLUTION NO. ______
RESOLUTION ADOPTING PROJECT LISTING FOR
FISCAL YEAR 2023/24 FUNDED BY SENATE BILL 1, THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, California State Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the California Legislature and signed into law by the Governor of California in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions to ensure that the residents of the City of Sunnyvale are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS, the City of Sunnyvale must adopt by resolution a list of proposed projects to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Sunnyvale will receive an estimated $3.8 million in RMRA funding in fiscal year 2023/24 pursuant to SB 1; and
WHEREAS, this is the seventh year in which the City of Sunnyvale is receiving SB 1 funding which will enable the City of Sunnyvale to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of Sunnyvale has undergone a robust public process to ensure public input into the community’s transportation priorities/the project list; and WHEREAS, the City of Sunnyvale used a Pavement Management System to develop the SB 1 project list to ensure that revenues are being used on the most high-priority and cost- effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City of Sunnyvale maintain and rehabilitate 340 streets/roads segments throughout the City of Sunnyvale this fiscal year and 300 similar projects into the future. The City of Sunnyvale uses SB 1 funds for its Pavement DRAFT 5/31/23_______
Attachment 2
Rehabilitation Program, which includes slurry seal, crack seal, and pavement rehabilitation projects; and
WHEREAS, the 2020 California Statewide Local Streets and Roads Needs Assessment found that the City of Sunnyvale’s streets and roads are in good condition and this revenue will help the City increase the overall quality of the City’s road system and over the next decade will bring the City’s streets and roads into a very good condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. Maintaining Sunnyvale Streets in very good condition is essential to maintaining the economic vitality of the City and enhancing the quality of life of the City’s residents.
NOW, THEREFORE IT IS HEREBY RESOLVED, BY THE CITY COUNCIL OF THE CITY OF SUNNYVALE THAT:
1. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct, and establish the factual basis for the City Council’s adoption of this Resolution.
2. The City Council hereby adopts the Resolution approving the Project Listing for fiscal year 2023/24 pursuant to the Road Repair and Accountability Act of 2017.
3. The City Council hereby approves the following list of newly proposed projects which will be funded in-part or solely with fiscal year 2023/24 Road Maintenance and Rehabilitation Account revenues:
[Project Tables Start on Next Page]
Attachment 2
Project Title: Slurry Seal 2023 B-SB1, ST-23-07
Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: July 2023 – June 2024
Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 Hollenbeck
Avenue
Fremont Avenue
(n/s)1
El Camino Real
(s/s)
348,240 Patch, Crack
Seal, Slurry
Seal
2 Arques
Avenue
Commercial Street
(e/s)
Lawrence
Expressway
(w/s)
306,049 Patch, Crack
Seal,
Slurry Seal
3 Morse Avenue Weddell Drive
(n/s)
Toyama Drive
(n/s) –
curb return
53,229 Patch,
Crack Seal,
Slurry Seal
TOTAL SQ
FOOTAGE
707,518
1 All tables utilize the following abbreviations:
ctr – center of intersection
s/s – south side
e/s – east side
w/s – west side
n/s – north side
n/o – north of
w/o – west of
n/end – north end
Attachment 2
Project Title: Pavement Rehabilitation 2024-B, ST-23-XX Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below
Estimated Project Schedule: July 2023 – May 2025
Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 Acacia Avenue Fair Oaks (e/s) –
curb returns
Bartlett Avenue
(w/s) – curb
returns
19,559 Mill & Fill
2 Molino
Avenue
Sutter Avenue
(s/s) – curb returns
Olive Avenue
(n/s) – curb returns
23,490 Mill & Fill
3 Benton Street Kensington Avenue
(n/end)
Lochinvar Avenue
(n/s) – curb returns
16,436 Mill & Fill
4 Norman Drive El Camino Real –
curb returns
Elizabeth Way
(n/s)
36,774 Mill & Fill
5 Arbor
Avenue
Worley Avenue
(e/s)
Fair Oaks Avenue
(w/s)
26,495 Mill & Fill
6 Torrington
Drive
Hollenbeck Avenue
(e/s) – curb returns
Snowberry Court
(ctr)
47,136 Mill & Fill
7 Arlington
Court
Peach Avenue
(w/s) – curb returns
West end 13,580 Mill & Fill
8 Humber Court Blackhawk Drive
(e/s) – curb returns
East end 11,708 Mill & Fill
9 Kenilworth
Court
Blackhawk Drive
(e/s) – curb returns
East end 8,582 Mill & Fill
10 Kinross Court Blackhawk Drive
(e/s) – curb returns
East end 12,017 Mill & Fill
11 Britton Avenue Wolfe Road (s/s) –
curb returns
Taylor Avenue
(n/s to w/s) – curb
returns
8,764 Mill & Fill
TOTAL SQ
FOOTAGE
224,541
Attachment 2
4. The following previously proposed and adopted projects may also utilize Fiscal Year 2023/24 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Sunnyvale is reaffirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Project Title: Pavement Rehabilitation 2022-SB1, ST-21-05 Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funding (Pavement Rehabilitation and Resurfacing, Patch and Crackseal) Project Location: See tables below
Estimated Project Schedule: March 2021 – June 2024
Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 Cascade Drive S. Bernardo Avenue Wright Avenue
(w/s)
49,000 Mill & Fill
2 Cheyenne Drive Owen Sound Drive
(ctr)
Drain inlet on
Valcartier Drive,
Electric Light Pole
#5C17
52,020 Mill & Fill
3 Connemara
Way
Sunnyvale Saratoga
Road (e/s)
Bittern Drive (w/s) 41,460 Mill & Fill
4 Cortez Drive Acalanes Drive
(e/s)
South Bernardo
Avenue (w/s)
36,676 Mill & Fill
5 Enderby Way Cascade Drive (n/s) North end 5,162 Mill & Fill 6 Gail Avenue Iris Avenue (s/s) Linden Avenue,
Electric Light Pole
#13D03
58,456 Mill & Fill
7 Lark Lane Linnet Lane Shetland Place 37,257 Mill & Fill 8 Lawrence
Station Road
Kifer Road (s/s) Below center of
overpass
37,125 Mill & Fill
9 Lochinvar
Avenue
Calabazas Creek
(e/s)
Waxwing Avenue
(ctr)
24,394 Mill & Fill
10 Lochinvar
Avenue
Waxwing Avenue
(ctr)
Lawrence
Expressway
17,751 Mill & Fill
11 Old San
Francisco Road
Fair Oaks Avenue
(e/s)
Wolfe Road (w/s) 159,871 Mill & Fill
12 S. Murphy
Avenue
W. Iowa Avenue
(s/s)
El Camino Real
(n/s), end of island
35,424 Mill & Fill
Attachment 2
13 Sandia Avenue Wildwood Avenue Havenwood
Avenue
55,068 Mill & Fill
14 Sheraton Dr Hollenbeck Avenue Spinosa Drive 43,680 Mill & Fill 15 Spinosa Dr
W. Remington
Drive (s/s)
Snowberry Court
(ctr) 28,981 Mill & Fill
16 Teal Dr Castleton Way Dunford Way (n/o) 49,366 Mill & Fill 17 W. Maude Ave N. Pastoria Avenue
(e/s)
N. Mathilda Ave
(w/s)
63,398 Mill & Fill
18 E. Arques Ave Fair Oaks Avenue
(e/s)
N. Wolfe Road
(w/s)
119,930 Mill & Fill
19 Vienna Dr Tasman Drive South end 50,698 Mill & Fill
TOTAL SQ
FOOTAGE
845,787
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 E. Arques
Avenue
Commercial Street Lawrence
Expressway
219,852 Patch &
Crackseal
2 E. Arques
Avenue
Lawrence
Expressway w/o
island nose
Lakeside Drive
(ctr)
43,313 Patch &
Crackseal
3 E. Arques
Avenue
Center of Lakeside
Drive
Oakmead
Parkway (ctr)
85,075 Patch &
Crackseal
4 Hollenbeck
Avenue
El Camino Real
(s/s)
Danforth Drive
(ctr)
109,802 Patch &
Crackseal
5 Hollenbeck
Avenue
Danforth Drive
(ctr)
Harvard Avenue
(ctr)
49,626 Patch &
Crackseal
6 Hollenbeck
Avenue
Harvard Avenue
(ctr)
Remington Drive
(n/s)
49,046 Patch &
Crackseal
7 Hollenbeck Ave
Avenue
Remington Drive
(s/s)
Torrington Drive
(ctr)
47,277 Patch &
Crackseal
8 Hollenbeck
Avenue
Torrington Drive
(ctr)
Fremont Avenue
(n/s)
50,298 Patch &
Crackseal
9 Morse Avenue Toyama Drive (ctr) Weddell Drive 53,229 Patch & Crackseal
TOTAL SQ
FOOTAGE
707,518
Attachment 2
Project Title: Pavement Rehabilitation Wolfe Road, ST-21-08 Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funds (Pavement Rehabilitation and Resurfacing)
Project Location: See table below
Estimated Project Schedule: September 2021 to September 2024 Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 Wolfe Road Fremont Avenue El Camino Real
(s/s)
22,637 Mill & Fill
2 Wolfe Road Marion Way Fremont Avenue 152,368 Mill & Fill 3 Wolfe Road Inverness Way Marion Way 88,407 Mill & Fill 4 Wolfe Road Homestead
Road, City Limit
Inverness Way 69,000 Mill & Fill
TOTAL SQ
FOOTAGE
332,412
Attachment 2
Project Title: Java Drive Road Diet and Bike Lanes, TR-21-02 Project Description: Only Slurry Seal Portion
Project Location: See table below
Estimated Project Schedule: June 2022 – August 2023
Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 Java Drive Mathilda
Avenue
Bordeaux Drive
(ctr)
59,438 Patch, Crackseal,
Slurry Seal
2 Java Drive Bordeaux
Drive (ctr)
Borregas Avenue
(ctr)
71,488 Patch, Crackseal,
Slurry Seal
3 Java Drive Borregas
Avenue (ctr)
Geneva Drive
(ctr)
67,742 Patch, Crackseal,
Slurry Seal
4 Java Drive Geneva Drive
(ctr)
Crossman Avenue
(ctr)
69,211 Patch, Crackseal,
Slurry Seal
TOTAL SQ
FOOTAGE
267,879
Attachment 2
Project Title: ATP - Safe Routes to School (Maude and Sunnyvale Avenues), TR-18-05 Project Description: Only Slurry Seal and Restriping Portion Project Location: See table below
Estimated Project Schedule: September 2022 – December 2023 Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 N. Sunnyvale
Avenue
Maude Avenue
(s/s)
Hazelton
Avenue (ctr)
37,938 Patch, Crackseal,
Slurry Seal
2 N. Sunnyvale
Avenue
Hazelton
Avenue (ctr)
Taylor Avenue
(ctr)
9,800 Patch, Crackseal,
Slurry Seal
3 N. Sunnyvale
Avenue
Taylor Avenue
(ctr)
E. Arques
Avenue (ctr)
26,360 Patch, Crackseal,
Slurry Seal
4 N. Sunnyvale
Avenue
E. Arques
Avenue (ctr)
E. California
Avenue (ctr)
34,031 Patch, Crackseal,
Slurry Seal
5 N. Sunnyvale
Avenue
E. California
Avenue (ctr)
E. Hendy
Avenue (ctr)
44,401 Patch, Crackseal,
Slurry Seal
TOTAL SQ
FOOTAGE
152,530
Attachment 2
Project Title: Slurry Seal 2023 B, ST-23-05
Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: July 2022 – October 2023
Estimated Project Useful Life: 10-20 years
No. Street Name Begins Ends Square
Foot
Projected
Treatment
1 E Arques
Avenue
Commercial
Street
Lawrence
Expressway
219,852 Patch, Crackseal,
Slurry Seal
2 E Arques
Avenue
Lawrence
Expressway w/o
island nose
Lakeside Drive
(ctr)
43,313 Patch, Crackseal,
Slurry Seal
3 E Arques
Avenue
Lakeside Drive
(ctr)
Oakmead
Parkway (ctr)
85,075 Patch, Crackseal,
Slurry Seal
4 Hollenbeck
Avenue
El Camino Real
(s/s)
Danforth Drive
(ctr)
109,802 Patch, Crackseal,
Slurry Seal
5 Hollenbeck
Avenue
Danforth Drive
(ctr)
Harvard Avenue
(ctr)
49,626 Patch, Crackseal,
Slurry Seal
6 Hollenbeck
Avenue
Harvard Avenue
(ctr)
W. Remington
Drive (n/s)
49,046 Patch, Crackseal,
Slurry Seal
7 Hollenbeck
Avenue
W. Remington
Drive (s/s)
Torrington Drive
(ctr)
47,277 Patch, Crackseal,
Slurry Seal
8 Hollenbeck
Avenue
Torrington Drive
(ctr)
W. Fremont
Avenue (n/s)
50,298 Patch, Crackseal,
Slurry Seal
9 Morse
Avenue
Toyama Drive
(ctr)
E. Weddell
Drive
53,229 Patch, Crackseal,
Slurry Seal
10 S. Wolfe
Road
E. Evelyn Avenue
(ctr)
Reed Avenue/
Old San
Francisco Road
(ctr)
128,549 Patch, Crackseal,
Slurry Seal
11 S. Wolfe
Road
Reed Avenue/
Old San
Francisco Road
(ctr)
Iris Avenue (ctr) 109,848 Patch, Crackseal,
Slurry Seal
12 S. Wolfe
Road
Iris Avenue (ctr) Gary Avenue
(ctr)
76,140 Patch, Crackseal,
Slurry Seal
13 S. Wolfe
Road
Gary Avenue
(ctr)
Maria Lane (ctr) 60,522 Patch, Crackseal,
Slurry Seal
14 S. Wolfe
Road
Maria Lane (ctr) El Camino Real
(n/s)
67,604 Patch, Crackseal,
Slurry Seal
TOTAL SQ
FOOTAGE
1,150,881
Attachment 2
Project Title: Pavement Rehabilitation 2024 (formerly Pavement Rehabilitation 2023), ST-23-01
Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below
Estimated Project Schedule: May 2022 – October 2024
Estimated Project Useful Life: 10-20 years
No. Street
Name
Begins Ends Square Foot Projected
Treatment
1 Oak Creek
Way
Manzano Way Sandia Avenue 45,831 Mill & Fill
2 Torrance
Avenue
Havenwood
Avenue (s/s)
Wildwood
Avenue
40,764 Mill & Fill
3 Persian
Drive
N driveway of 1280
Persian Drive
Lawrence
Expressway
24,570 Mill & Fill
4 Morse
Avenue
Ctr driveway of
1111 Morse
Avenue
Toyama Drive
(ctr)
36,871 Mill & Fill
5 Morse
Avenue
E. Ferndale Avenue
(n/s)
N. Fernwood
Circle (s/s)
17,315 Mill & Fill
6 Britton
Avenue
N. Wolfe Road E. Taylor
Avenue
8,764 Mill & Fill
7 San Patricio
Avenue
Coachella Avenue
(s/s)
E. Duane
Avenue
15,600 Mill & Fill
8 Acacia
Avenue
N. Fair Oaks
Avenue
Bartlett
Avenue
19,559 Mill & Fill
9 Molino
Avenue
Sutter Avenue W. Olive
Avenue
23,490 Mill & Fill
10 Arlington
Court
Peach Avenue East end 13,580 Mill & Fill
11 Torrington
Drive
Hollenbeck Avenue
(e/s)
Snowberry
Court (ctr)
47,136 Mill & Fill
12 Wright
Avenue
W. Fremont
Avenue (s/s)
Cascade Drive
(ctr)
51,778 Mill & Fill
13 Cascade
Drive
Prince Edward Way
(ctr)
Selo Drive
(ctr)
23,111 Mill & Fill
14 Cascade
Drive
Selo Drive (ctr) Sydney Drive
(ctr)
8,994 Mill & Fill
15 Humber
Court
Blackhawk Drive East end 11,708 Mill & Fill
Attachment 2
16 Kenilworth
Court
Blackhawk Drive East end 8,582 Mill & Fill
17 Kinross
Court
Blackhawk Drive East end 12,017 Mill & Fill
18 Benton
Street
Kensington Place Lochinvar
Avenue (n/s)
16,436 Mill & Fill
19 Dunford
Way
Oriole Avenue (e/s) Quail Avenue
(w/s)
44,730 Mill & Fill
20 Dunford
Way
Quail Avenue (w/s) Teal Drive
(w/o)
30,710 Mill & Fill
21 Lanark
Court
Quail Avenue West end 8,855 Mill & Fill
22 Lorne Way Swallow Drive (e/s) East end 18,849 Mill & Fill 23 Norman
Drive
El Camino Real Elizabeth Way
(n/s)
36,774 Mill & Fill
24 Vireo
Avenue
Lochinvar Avenue
(s/s)
London
Avenue (n/s)
18,656 Mill & Fill
TOTAL SQ
FOOTAGE
584,680
5. The City Council hereby directs City Staff to submit said Project Lists to the California Transportation Commission.
6. This Resolution shall take effect immediately upon its adoption.
Attachment 2
Adopted by the City Council at a regular meeting held on ___________, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
RECUSAL:
ATTEST: APPROVED:
__________________________________ _________________________________ City Clerk Mayor
(SEAL)
APPROVED AS TO FORM:
___________________________________
City Attorney
Attachment 2