09/07/23 Bid Summary
IFB PW23-15 Snail Neighorhod Improvements
(TR-19-01 Federal Aid No. CML-5213(068) DBE Goal 22%
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Recommend Not to Exceed 5% of
Total Base Bid) 1 LS 191,000.00$ 121,000.00$ 200,000.00$ 220,000.00$ 220,000.00$ 240,000.00$ 450,000.00$ 2 Traffic Control and Public Convenience 1 LS 214,567.00$ 194,000.00$ 102,162.00$ 300,000.00$ 370,000.00$ 625,000.00$ 300,000.00$ 3 Water Pollution Control Program 1 LS 10,500.00$ 26,500.00$ 14,000.00$ 65,000.00$ 11,300.00$ 50,000.00$ 175,000.00$ 4 Clear and Grub 1 LS 21,500.00$ 36,000.00$ 45,000.00$ 150,000.00$ 25,000.00$ 26,000.00$ 150,000.00$ 5 Utility Verification (Potholing) 1 LS 16,000.00$ 20,000.00$ 15,000.00$ 72,000.00$ 30,000.00$ 85,000.00$ 15,000.00$ 6 Concrete and Roadway Excavation 1 LS 470,000.00$ 378,000.00$ 457,200.00$ 855,000.00$ 576,700.00$ 400,000.00$ 411,569.00$ 7 Install Curb Ramp (Detail 13C) 48 EA 4,680.00$ 224,640.00$ 5,300.00$ 254,400.00$ 4,000.00$ 192,000.00$ 4,500.00$ 216,000.00$ 7,100.00$ 340,800.00$ 5,400.00$ 259,200.00$ 3,500.00$ 168,000.00$ 7* Install Curb Ramp (Detail 13C) REVOCABLE @
San Miguel/Alvarado 2 EA 4,000.00$ 8,000.00$ 4,100.00$ 8,200.00$ 4,000.00$ 8,000.00$ 3,400.00$ 6,800.00$ 7,200.00$ 14,400.00$ 6,200.00$ 12,400.00$ 4,000.00$ 8,000.00$ 8 Install Type II-6 Curb and Gutter (Detail 15C) 2,390 LF 40.00$ 95,600.00$ 97.00$ 231,830.00$ 100.00$ 239,000.00$ 85.00$ 203,150.00$ 130.00$ 310,700.00$ 81.00$ 193,590.00$ 150.00$ 358,500.00$ 8* Install Type II-6 Curb and Gutter (Detail 15C)
REVOCABLE @ San Miguel/Alvarado 75 LF 38.00$ 2,850.00$ 103.00$ 7,725.00$ 100.00$ 7,500.00$ 65.00$ 4,875.00$ 120.00$ 9,000.00$ 60.00$ 4,500.00$ 100.00$ 7,500.00$ 8* Install Type II-6 Curb and Gutter (Detail 15C) 20 LF 38.00$ 760.00$ 103.00$ 2,060.00$ 100.00$ 2,000.00$ 75.00$ 1,500.00$ 150.00$ 3,000.00$ 60.00$ 1,200.00$ 100.00$ 2,000.00$ 9 Install Type IV-6 Vertical Curb (Detail 17C) 286 LF 35.00$ 10,010.00$ 71.00$ 20,306.00$ 62.00$ 17,732.00$ 65.00$ 18,590.00$ 120.00$ 34,320.00$ 63.00$ 18,018.00$ 100.00$ 28,600.00$ 9* Install Type IV-6 Vertical Curb (Detail 17C) 20 LF 35.00$ 700.00$ 71.00$ 1,420.00$ 62.00$ 1,240.00$ 72.00$ 1,440.00$ 110.00$ 2,200.00$ 50.00$ 1,000.00$ 100.00$ 2,000.00$ 10 Install Detectable Warning Surface 80 SF 28.00$ 2,240.00$ 60.00$ 4,800.00$ 65.00$ 5,200.00$ 60.00$ 4,800.00$ 65.00$ 5,200.00$ 50.00$ 4,000.00$ 100.00$ 8,000.00$ 10* Install Detectable Warning Surface REVOCABLE 20 SF 25.00$ 500.00$ 60.00$ 1,200.00$ 50.00$ 1,000.00$ 56.00$ 1,120.00$ 65.00$ 1,300.00$ 50.00$ 1,000.00$ 100.00$ 2,000.00$ 11 Install Driveway 76 SF 20.00$ 1,520.00$ 22.00$ 1,672.00$ 22.00$ 1,672.00$ 28.00$ 2,128.00$ 76.00$ 5,776.00$ 26.50$ 2,014.00$ 60.00$ 4,560.00$ 12 Install Concrete Sidewalk 26,803 SF 10.00$ 268,030.00$ 16.90$ 452,970.70$ 18.00$ 482,454.00$ 15.00$ 402,045.00$ 31.00$ 830,893.00$ 20.50$ 549,461.50$ 25.00$ 670,075.00$ 12* Install Concrete Sidewalk REVOCABLE @ San 475 SF 8.00$ 3,800.00$ 14.90$ 7,077.50$ 18.00$ 8,550.00$ 13.00$ 6,175.00$ 34.00$ 16,150.00$ 15.00$ 7,125.00$ 20.00$ 9,500.00$ 12* Install Concrete Sidewalk REVOCABLE @ San 400 SF 8.00$ 3,200.00$ 14.90$ 5,960.00$ 18.00$ 7,200.00$ 15.00$ 6,000.00$ 34.00$ 13,600.00$ 15.00$ 6,000.00$ 20.00$ 8,000.00$ 13 Install Hot Mix Asphalt (Type A) 976 TON 393.00$ 383,568.00$ 320.00$ 312,320.00$ 457.00$ 446,032.00$ 330.00$ 322,080.00$ 380.00$ 370,880.00$ 690.00$ 673,440.00$ 260.00$ 253,760.00$ 13* Install Hot Mix Asphalt (Type A) REVOCABLE @ 19 TON 398.00$ 7,562.00$ 332.00$ 6,308.00$ 457.00$ 8,683.00$ 635.00$ 12,065.00$ 380.00$ 7,220.00$ 350.00$ 6,650.00$ 224.00$ 4,256.00$ 13* Install Hot Mix Asphalt (Type A) REVOCABLE @
San Miguel/Amador 1 TON 398.00$ 398.00$ 900.00$ 900.00$ 457.00$ 457.00$ 1,150.00$ 1,150.00$ 380.00$ 380.00$ 350.00$ 350.00$ 400.00$ 400.00$ 13* Install Hot Mix Asphalt (Type A) REVOCABLE @
San Aleso/Mathilda 220 TON 393.00$ 86,460.00$ 320.00$ 70,400.00$ 260.00$ 57,200.00$ 207.00$ 45,540.00$ 370.00$ 81,400.00$ 380.00$ 83,600.00$ 260.00$ 57,200.00$ 14 Install AC Speed Table/Raised Crosswalk 2 EA 4,400.00$ 8,800.00$ 18,000.00$ 36,000.00$ 19,108.00$ 38,216.00$ 10,000.00$ 20,000.00$ 6,000.00$ 12,000.00$ 16,500.00$ 33,000.00$ 20,000.00$ 40,000.00$ 15 Remove Storm Drain Inlet 8 EA 860.00$ 6,880.00$ 2,400.00$ 19,200.00$ 1,800.00$ 14,400.00$ 3,600.00$ 28,800.00$ 1,750.00$ 14,000.00$ 3,000.00$ 24,000.00$ 2,800.00$ 22,400.00$ 16 Abandon Storm Drain Pipe 71 LF 100.00$ 7,100.00$ 130.00$ 9,230.00$ 59.00$ 4,189.00$ 210.00$ 14,910.00$ 93.00$ 6,603.00$ 175.00$ 12,425.00$ 1,500.00$ 106,500.00$ 17 Remove Storm Drain Pipe 176 LF 130.00$ 22,880.00$ 180.00$ 31,680.00$ 59.00$ 10,384.00$ 340.00$ 59,840.00$ 135.00$ 23,760.00$ 60.00$ 10,560.00$ 1,800.00$ 316,800.00$ 18 Install 24" Drain Inlet (Detail 10A) 20 EA 9,200.00$ 184,000.00$ 5,600.00$ 112,000.00$ 5,800.00$ 116,000.00$ 3,700.00$ 74,000.00$ 4,375.00$ 87,500.00$ 5,500.00$ 110,000.00$ 4,000.00$ 80,000.00$ 19 Install Type 1 Concentric Manhole (Detail 1A) 10 EA 25,000.00$ 250,000.00$ 7,600.00$ 76,000.00$ 12,500.00$ 125,000.00$ 8,650.00$ 86,500.00$ 9,250.00$ 92,500.00$ 23,000.00$ 230,000.00$ 45,000.00$ 450,000.00$ 20 Convert Existing Catch Basin to Flat Grate Drain 1 EA 4,400.00$ 4,400.00$ 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 3,800.00$ 3,800.00$ 3,250.00$ 3,250.00$ 3,200.00$ 3,200.00$ 10,000.00$ 10,000.00$ 21 Install 12" RCP Storm Drain 515 LF 677.00$ 348,655.00$ 370.00$ 190,550.00$ 510.00$ 262,650.00$ 410.00$ 211,150.00$ 518.00$ 266,770.00$ 510.00$ 262,650.00$ 100.00$ 51,500.00$ 22 Adjust Utility to Grade (City Water Valve Covers) 21 EA 330.00$ 6,930.00$ 180.00$ 3,780.00$ 500.00$ 10,500.00$ 1,075.00$ 22,575.00$ 785.00$ 16,485.00$ 1,900.00$ 39,900.00$ 1,000.00$ 21,000.00$ 22* Adjust Utility to Grade (City Water Valve Covers)
REVOCABLE @ San Miguel/Alvarado 3 EA 330.00$ 990.00$ 180.00$ 540.00$ 500.00$ 1,500.00$ 1,075.00$ 3,225.00$ 785.00$ 2,355.00$ 1,900.00$ 5,700.00$ 10,000.00$ 30,000.00$ 23 Adjust Utility to Grade (Storm Drain Manhole) 2 EA 3,900.00$ 7,800.00$ 2,000.00$ 4,000.00$ 900.00$ 1,800.00$ 3,300.00$ 6,600.00$ 1,675.00$ 3,350.00$ 2,700.00$ 5,400.00$ 10,000.00$ 20,000.00$ 24 Adjust Utility to Grade (City Water Meter Cover) 6 EA 330.00$ 1,980.00$ 180.00$ 1,080.00$ 400.00$ 2,400.00$ 2,100.00$ 12,600.00$ 825.00$ 4,950.00$ 200.00$ 1,200.00$ 10,000.00$ 60,000.00$ 25 Relocate Street Light Standard 1 EA 13,600.00$ 13,600.00$ 15,600.00$ 15,600.00$ 14,150.00$ 14,150.00$ 14,400.00$ 14,400.00$ 5,400.00$ 5,400.00$ 12,300.00$ 12,300.00$ 70,000.00$ 70,000.00$ 26 Slurry Seal 511 SQYD 51.00$ 26,061.00$ 60.00$ 30,660.00$ 65.00$ 33,215.00$ 69.00$ 35,259.00$ 60.00$ 30,660.00$ 54.00$ 27,594.00$ 30.00$ 15,330.00$ 27 Monuments and Benchmarks 1 LS 2,000.00$ 6,200.00$ 2,700.00$ 17,000.00$ 40,000.00$ 2,000.00$ 30,000.00$ 28 Furnish and Install Trench Frame and Grate 20 LF 340.00$ 6,800.00$ 394.00$ 7,880.00$ 550.00$ 11,000.00$ 410.00$ 8,200.00$ 1,100.00$ 22,000.00$ 825.00$ 16,500.00$ 1,500.00$ 30,000.00$ 29 Convert Existing Inlet to Flat Grate Drain with
Maintenance Hole Cover 1 EA 7,300.00$ 7,300.00$ 5,400.00$ 5,400.00$ 4,000.00$ 4,000.00$ 5,690.00$ 5,690.00$ 12,000.00$ 12,000.00$ 2,800.00$ 2,800.00$ 30,000.00$ 30,000.00$ 30 Tree Removal 3 EA 2,200.00$ 6,600.00$ 3,200.00$ 9,600.00$ 2,300.00$ 6,900.00$ 2,450.00$ 7,350.00$ 3,950.00$ 11,850.00$ 2,000.00$ 6,000.00$ 10,000.00$ 30,000.00$ 31 Furnish and Install New Tree 4 EA 2,700.00$ 10,800.00$ 3,200.00$ 12,800.00$ 2,800.00$ 11,200.00$ 2,950.00$ 11,800.00$ 2,500.00$ 10,000.00$ 2,500.00$ 10,000.00$ 15,000.00$ 60,000.00$ 32 Furnish and Install Landscaping 1 LS 14,000.00$ 60,000.00$ 4,000.00$ 12,650.00$ 30,000.00$ 29,000.00$ 130,000.00$ 33 Furnish and Install Bollard 3 EA 7,400.00$ 22,200.00$ 12,000.00$ 36,000.00$ 6,000.00$ 18,000.00$ 9,860.00$ 29,580.00$ 1,000.00$ 3,000.00$ 12,750.00$ 38,250.00$ 7,000.00$ 21,000.00$ 34 Install Curb with 1' Gutter 130 LF 40.00$ 5,200.00$ 90.00$ 11,700.00$ 83.00$ 10,790.00$ 65.00$ 8,450.00$ 135.00$ 17,550.00$ 69.00$ 8,970.00$ 200.00$ 26,000.00$ 35 Install 24" Flat Grate Drop Inlet (Detail 11A) 1 EA 5,600.00$ 5,600.00$ 5,400.00$ 5,400.00$ 4,500.00$ 4,500.00$ 3,700.00$ 3,700.00$ 7,250.00$ 7,250.00$ 5,100.00$ 5,100.00$ 3,000.00$ 3,000.00$ 36 Install Intersection Valley Gutter (Detail 16C) 380 SF 14.00$ 5,320.00$ 38.00$ 14,440.00$ 38.00$ 14,440.00$ 20.00$ 7,600.00$ 135.00$ 51,300.00$ 18.00$ 6,840.00$ 100.00$ 38,000.00$ 36* Install Intersection Valley Gutter (Detail 16C)
REVOCABLE @ San Miguel/Alvarado 105 SF 14.00$ 1,470.00$ 38.00$ 3,990.00$ 38.00$ 3,990.00$ 33.00$ 3,465.00$ 135.00$ 14,175.00$ 16.00$ 1,680.00$ 30.00$ 3,150.00$ 37 Pedestrian Hybrid Beacon (E. Duane Ave at San
Miguel Ave) 1 LS 328,950.00$ 380,000.00$ 350,000.00$ 372,000.00$ 365,600.00$ 297,000.00$ 500,000.00$ FBD Vangurad Construction, Inc.
550 Greenville Rd
Livermore, CA 94550
Billie Sposeto
Sposeto Engineering
4558 Contractors Place
Livermore, CA 94551
John P Sposeto
Joseph J Albanese
851 Martin Ave
Santa Clara, CA 95050
Phillip J Albanese
Golden Bay Construction
3826 Depot Rd
Hayward, CA 94545
Johnny Zanette
Ray's Electric
411 Pendleton Way Ste. B
Oakland, CA 94621
Greg Gruendl
S&H Construction
5560 Boscell Common
Fremont, CA 94538
Harmeet Anand
Ghilotti Brothers
525 Jacoby St
San Rafael, CA 94901
David Cantor
Attachment 1
09/07/23 Bid Summary
IFB PW23-15 Snail Neighorhod Improvements
(TR-19-01 Federal Aid No. CML-5213(068) DBE Goal 22%
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Billie Sposeto John P Sposeto Phillip J AlbaneseJohnny Zanette Greg Gruendl Harmeet AnandDavid Cantor 38 Traffic Signal Modifications (Mathilda @ San Aleso) 1 LS 35,000.00$ 42,000.00$ 36,500.00$ 38,000.00$ 16,800.00$ 31,800.00$ 60,000.00$ 39 Traffic Signal Modifications (Fair Oaks Ave @
Ahwanee Ave) 1 LS 11,400.00$ 14,000.00$ 14,200.00$ 12,000.00$ 5,000.00$ 10,325.00$ 60,000.00$ 40 Traffic Signal Modifications (Fair Oaks Ave @
Caliente Dr) 1 LS 28,800.00$ 36,000.00$ 29,000.00$ 30,500.00$ 40,300.00$ 26,040.00$ 60,000.00$ 41 Install Speed Feedback Sign 3 EA 38,300.00$ 114,900.00$ 44,000.00$ 132,000.00$ 39,000.00$ 117,000.00$ 35,000.00$ 105,000.00$ 30,000.00$ 90,000.00$ 34,650.00$ 103,950.00$ 30,000.00$ 90,000.00$ 42 Signing and Striping 1 LS 371,000.00$ 425,000.00$ 495,000.00$ 379,000.00$ 335,000.00$ 350,000.00$ 500,000.00$ Bid Bid Total 3,890,821.00$ 3,901,779.20$ 4,090,906.00$ 4,563,102.00$ 4,921,627.00$ 4,973,732.50$ 6,058,600.00$ DBE Goal 24.86% 15.72% 0% 22.50%
Surety
License
Sub Contractor
QA Constructors HMA Bond Blacktop
Inc. Slurry Seal ABSL
Construction Grinding Lone Star
Landscape, Inc. Landscaping TDW
Construction
Storm Drain
Systems
Bond Blacktop,
Inc. Slurry Seal Pawn
Construction Electrical
Lone Star
Lanscaping, Inc. Landscaping Tully Consulting
Group SWPP Benchmark
Engineering Survey Chrisp Company Stripe, Sign, and
Traffice Control Ground Control Excavation/Utility Bay Line Cutting and Coring Inc Sawcutting
Norsthstar Truck
Lines, Inc. Trucking Chrisp Company Stripe & Sign Bond Blacktop, Inc. Slurry Seal Graham
Contractors, Inc. Slurry Seal CMC Traffic
Control Traffic Control Lonestar
Landscape Inc Landscape
Chrisp Company Striping Columbia
Electric, Inc Electrical Lone Star
Landscape, Inc Landscaping
Blackwell
General
Engineering, Inc.
Utility, Storm Drain Constuction
Survey Survey Chrisp Company Striping & Signs
Bond Blacktop,
Inc. Slurry Seal A1 Trucking
SVS, Inc. Trucking Columbia
Electric, Inc. Electrical Columbia
Electric, Inc. Electrical Graham
Contractors Microseal Columbia
Electric Inc Electrical
Columbia
Electric Electrical Benchmark
Engineering Inc Survey A1 Trucking
SVS, Inc. Trucking Chrisp Company Striping Total Traffic Control Inc Traffic Control
CMC Traffic
Control Traffic Control Chrisp Company Striping and Signs Lone Star
Landscape, Inc. Landscape
Note: * Bid submitted by S&H Construction Inc. contains math error in the bid total. The accurte bid amount is shown. 10% Bid Bond
A, B, C-8
10% Bid Bond
A, C-8
10% Bid Bond
A, C8, C21, C61/D06, C50, C12,
10% Bid Bond
A, B, C10, C12, C31
10% Bid Bond
A & C10
10% Bid Bond
A,B,C-9,C-10,C-20,C36
10% Bid Bond
A, C8, C12, C21, C32, C42, HAZ
Attachment 1