08/24/23 Bid Summary
IFB
PW23-16 Peery Park area Transportation
Improvements
(TR-18-09 Federal Aid No. CML-5213(061)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Traffic Control System 1 LS 45,000.00 $ 125,000.00 $ 391,000.00 $ 257,950.00 $ 221,000.00 $ 2 Mobilization 1 LS 128,000.00 $ 260,000.00 $ 404,000.00 $ 100,000.00 $ 198,000.00 $ 3 Storm Water Pollution Prevention 1 LS 22,000.00 $ 50,000.00 $ 92,500.00 $ 10,000.00 $ 61,000.00 $ 4 Construction Survey 1 LS 18,000.00 $ 23,000.00 $ 78,000.00 $ 20,000.00 $ 22,300.00 $ 5 Monument Preservation (incl. Pre-construction and
Post-construction) 1 EA 3,600.00 $ 3,600.00 $ 6,000.00 $ 6,000.00 $ 3,500.00 $ 3,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 6 Exploration Hole (Potholing) 1 LS 12,000.00 $ 25,000.00 $ 85,000.00 $ 8,000.00 $ 52,800.00 $ 7 Clearing and Grubbing, Excavation, Grading, and
Earthwork 1 LS 180,000.00 $ 172,000.00 $ 95,000.00 $ 129,645.00 $ 97,000.00 $ 8 Import Fill 1 LS 24,000.00 $ 95,000.00 $ 30,888.00 $ 329,862.00 $ 163,000.00 $ 9 Site Preparation & Plant Protection 1 LS 54,945.00 $ 80,000.00 $ 18,500.00 $ 10,000.00 $ 97,700.00 $ 10 Remove Concrete and Base (Miscellaneous) 1 LS 20,146.00 $ 75,000.00 $ 199,000.00 $ 77,400.00 $ 183,000.00 $ 11 Remove Asphalt Pavement and Base 1,840 CY 48.00 $ 88,320.00$ 78.00 $ 143,520.00$ 55.00 $ 101,200.00$ 193.50 $ 356,040.00$ 207.00 $ 380,880.00$ 12 Remove Existing Street Light and Foundation 15 EA 2,772.00 $ 41,580.00 $ 1,240.00 $ 18,600.00 $ 2,000.00 $ 30,000.00 $ 1,650.00 $ 24,750.00 $ 1,850.00 $ 27,750.00 $ 13 Remove Existing Street Light Conduits and Boxes 1 LS 91,661.00 $ 7,600.00 $ 12,500.00 $ 8,250.00 $ 9,300.00 $ 14 Profile Grind 14,780 SF 3.13$
46,261.40$ 1.00$
14,780.00$ 2.00$
29,560.00$ 1.50$
22,170.00$ 1.60$
23,648.00$
15 Crack Sealing (Final Pay) 1 LS 18,744.00$ 12,000.00$ 11,500.00$ 13,000.00$ 17,600.00$ 16 Type II Slurry Seal Surfacing 5,390 SY 17.90$ 96,481.00$ 7.00$ 37,730.00$ 7.00$
37,730.00$ 7.30$
39,347.00$ 12.50$ 67,375.00$
17 Minor Concrete (Curb and Gutter and Base) 4,440 LF 102.00$ 452,880.00$ 70.00$ 310,800.00$ 68.00$ 301,920.00$ 57.10$ 253,524.00$ 77.30$ 343,212.00$ 18 Minor Concrete (Sidewalk and Base) 26,160 SF 17.52$ 458,323.20$ 13.50$ 353,160.00$ 16.00$ 418,560.00$ 17.35$ 453,876.00$ 15.80$ 413,328.00$ 19 Minor Concrete (Driveway and Base) 5,780 SF 20.87$ 120,628.60$ 26.00$ 150,280.00$ 26.00$ 150,280.00$ 26.45$ 152,881.00$ 20.25$ 117,045.00$ 20 Minor Concrete (Curb Ramp and Base) 10 EA 4,254.00$ 42,540.00$ 5,450.00$ 54,500.00$ 5,000.00$ 50,000.00$ 6,115.00$ 61,150.00$ 5,246.00$ 52,460.00$ 21 Minor Concrete (Vertical Curb and Base) 440 LF 72.28$ 31,803.20$ 59.00$ 25,960.00$ 100.00$ 44,000.00$ 61.15$ 26,906.00$ 72.00$ 31,680.00$ 22 Hot Mix Asphalt Paving 600 TON 144.00$ 86,400.00$ 230.00$ 138,000.00$ 220.00$ 132,000.00$ 401.35$ 240,810.00$ 349.00$ 209,400.00$ 23 24" Curb Drop Inlet 6 EA 9,616.00$ 57,696.00$ 3,750.00$ 22,500.00$ 9,400.00$ 56,400.00$ 9,100.00$ 54,600.00$ 5,800.00$ 34,800.00$ 24 Type OS Inlet 1 EA 13,294.00 $ 13,294.00$ 4,150.00$ 4,150.00$ 8,500.00$ 8,500.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 25 Modified Type GO Inlet 2 EA 14,330.00 $ 28,660.00$ 5,400.00$ 10,800.00$ 9,800.00$ 19,600.00$ 9,000.00$ 18,000.00$ 7,900.00$ 15,800.00$ 26 Christy V12 Drain Box (H-20 Traffic Rated) 6 EA 2,102.00$ 12,612.00$ 2,220.00$ 13,320.00$ 3,000.00$ 18,000.00$ 3,600.00$ 21,600.00$ 1,200.00$ 7,200.00$ 27 Christy V12 Drain Box (Pedestrian Traffic) 20 EA 1,972.00$ 39,440.00$ 2,075.00$ 41,500.00$ 2,000.00$ 40,000.00$ 1,000.00$ 20,000.00$ 1,200.00$ 24,000.00$ 28 2" Sidewalk Drain 182 LF 59.00$ 10,738.00$ 35.00$ 6,370.00$ 31.00$ 5,642.00$ 50.00$ 9,100.00$ 21.00$ 3,822.00$ 29 3" Sidewalk Drain 320 LF 74.00$ 23,680.00$ 47.00$ 15,040.00$ 38.00$ 12,160.00$ 60.00$ 19,200.00$ 21.00$ 6,720.00$ 30 4" PVC SDR-35 Perforated Storm Drain Pipe 150 LF 37.00$ 5,550.00$ 75.00$ 11,250.00$ 80.00$ 12,000.00$ 60.00$ 9,000.00$ 26.00$ 3,900.00$ 31 6" PVC SDR-26 Storm Drain Pipe 75 LF 43.00$ 3,225.00$ 57.00$ 4,275.00$ 520.00$ 39,000.00$ 510.00$ 38,250.00$ 220.00$ 16,500.00$ 32 12" PVC SDR-26 Storm Drain Pipe 49 LF 311.00$ 15,239.00$ 65.00$ 3,185.00$ 530.00$ 25,970.00$ 525.00$ 25,725.00$ 460.00$ 22,540.00$ 33 18 Reinforced Concrete Storm Drain Pipe (Class
III) 60 LF 532.00$ 31,920.00$ 260.00$ 15,600.00$ 700.00$ 42,000.00$ 695.00$ 41,700.00$ 541.00$ 32,460.00$ 34 24 Reinforced Concrete Storm Drain Pipe (Class
III) 10 LF 678.00$ 6,780.00$ 315.00$ 3,150.00$ 888.00$ 8,880.00$ 750.00$ 7,500.00$ 850.00$ 8,500.00$ 35 Storm Drain Manhole 1 EA 16,687.00 $ 16,687.00$ 7,800.00$ 7,800.00$ 18,000.00$ 18,000.00$ 17,875.00$ 17,875.00$ 14,000.00$ 14,000.00$ 36 Concrete Pipe Collar 1 EA 1,843.00$ 1,843.00$ 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$ 2,200.00$ 2,200.00$ 2,600.00$ 2,600.00$ 37 Convert Existing Inlet to Storm Drain Manhole 6 EA 12,256.00 $ 73,536.00$ 8,100.00$ 48,600.00$ 7,000.00$ 42,000.00$ 7,150.00$ 42,900.00$ 5,500.00$ 33,000.00$ 38 Remove Existing Storm Drain Manhole 4 EA 9,616.00$ 38,464.00$ 4,000.00$ 16,000.00$ 3,800.00$ 15,200.00$ 4,180.00$ 16,720.00$ 2,000.00$ 8,000.00$ 39 No Pedestrian Crossing Barricade 2 EA 4,855.00$ 9,710.00$ 1,650.00$ 3,300.00$ 1,600.00$ 3,200.00$ 3,500.00$ 7,000.00$ 1,400.00$ 2,800.00$ 40 Planting 1 LS 241,843.00$ 235,000.00$ 171,000.00$ 274,114.50$ 450,200.00$ QLM-Inc.
94 Umbargar Rd
San Jose, CA 95111
Darrell Qualls
Joseph J. Albanese, Inc.
851 Martin Ave.
Santa Clara, CA 95050
Phillip J Albanese
JJR Construction, Inc.
1120 Ninth Ave
San Mateo, CA 94402
Carlos Raposo
Redgwick Construction Co.
21 Hegenberger Ct
Oakland, CA 94621
Bob Rahebi
Sposeto Engineering, Inc.
4558 Contrctors Place
Livermore, CA 94551
Vinh C. Truong
Attachment 1
05/23/22 Bid Summary
IFB
PW23-16 Peery Park area Transportation
Improvements
(TR-18-09 Federal Aid No. CML-5213(061)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Darrell Qualls Phillip J Albanese Carlos Raposo Bob Rahebi Vinh C. Truong 41 Landscape Soil Import 1 LS 9,419.00$ 100,000.00$ 75,000.00$ 71,500.00$ 86,600.00$ 42 Drain Rock 1 LS 3,060.00$ 6,500.00$ 4,000.00$ 3,300.00$ 17,400.00$ 43 Cobbles at Curb Outlet 1 LS 3,232.00$ 4,500.00$ 4,000.00$ 2,640.00$ 2,100.00$ 44 Maintenance Period 1 LS 4,884.00$ 18,000.00$ 16,000.00$ 8,800.00$ 15,000.00$ 45 New Irrigation System 1 LS 194,003.00$ 250,000.00$ 262,000.00$ 247,500.00$ 368,000.00$ 46 Water Meter for New Irrigation System 1 EA 5,000.00$ 5,000.00$ 20,000.00$ 20,000.00$ 9,000.00$ 9,000.00$ 10,000.00$ 10,000.00$ 6,100.00$ 6,100.00$ 47 Street Light w/ Foundation per City Std Detail 5 EA 22,763.00 $ 113,815.00$ 20,000.00$ 100,000.00$ 17,245.00$ 86,225.00$ 18,970.00$ 94,850.00$ 21,500.00$ 107,500.00$ 48 Street Light w/ Foundation per Modified Structural
Detail 1 5 EA 23,496.00 $ 117,480.00$ 20,000.00$ 100,000.00$ 17,800.00$ 89,000.00$ 19,580.00$ 97,900.00$ 22,000.00$ 110,000.00$ 49 Street Light w/ Foundation per Modified Structural
Detail 2 6 EA 24,175.00 $ 145,050.00$ 20,000.00$ 120,000.00$ 18,315.00$ 109,890.00$ 20,147.00$ 120,882.00$ 22,700.00$ 136,200.00$ 50 New Lighting System 1 LS 319,255.00$ 255,000.00$ 251,000.00$ 120,879.00$ 311,700.00$ 51 Remove Striping, Pavement Markers and
Pavement Markings 1 LS 14,330.00$ 10,000.00$ 8,500.00$ 276,100.00$ 10,600.00$ 52 Striping (12-in White) 390 LF 21.00$ 8,190.00$ 11.00$ 4,290.00$ 10.00$ 3,900.00$ 11.00$ 4,290.00$ 12.50$ 4,875.00$
53 Striping (Detail 22) 2,100 LF 12.00$ 25,200.00$ 9.00$ 18,900.00$ 9.00$ 18,900.00$ 9.10$ 19,110.00$ 10.50$ 22,050.00$ 54 Pavement Markings 250 SF 27.00$ 6,750.00$ 11.00$ 2,750.00$ 10.00$ 2,500.00$ 11.00$ 2,750.00$ 12.50$ 3,125.00$ 55 Red Curb (2-coat) 700 LF 12.00$ 8,400.00$ 7.00$ 4,900.00$ 6.00$ 4,200.00$ 6.60$ 4,620.00$ 7.50$ 5,250.00$ 56 Blue Retroreflective Pavement Marker 7 EA 490.00$ 3,430.00$ 40.00$ 280.00$ 35.00$ 245.00$ 38.50$ 269.50$ 43.50$ 304.50$ 57 Roadside Sign (New Sign on New Post) 12 EA 978.00$ 11,736.00$ 630.00$ 7,560.00$ 545.00$ 6,540.00$ 600.00$ 7,200.00$ 675.00$ 8,100.00$ 58 Roadside Sign (New Sign on Existing Post or New
Streetlight Pole) 18 EA 760.00$ 13,680.00$ 515.00$ 9,270.00$ 500.00$ 9,000.00$ 490.00$ 8,820.00$ 550.00$ 9,900.00$ 59 Adjust Irrigation Heads 1 LS 5,500.00$ 4,000.00$ 3,500.00$ 3,500.00$ 24,750.00$ 60 Adjust City Drainage Inlet Frame to Grade 2 EA 3,500.00$ 7,000.00$ 2,200.00$ 4,400.00$ 2,800.00$ 5,600.00$ 2,500.00$ 5,000.00$ 2,800.00$ 5,600.00$ 61 Adjust City Water Valve Cover to Grade 26 EA 865.00$ 22,490.00$ 1,000.00$ 26,000.00$ 780.00$ 20,280.00$ 400.00$ 10,400.00$ 140.00$ 3,640.00$ 62 Adjust City Water Meter Cover to Grade 9 EA 568.00$ 5,112.00$ 2,000.00$ 18,000.00$ 500.00$ 4,500.00$ 400.00$ 3,600.00$ 140.00$ 1,260.00$ 63 Protect City Fire Hydrant in Place 6 EA 480.00$ 2,880.00$ 10,000.00$ 60,000.00$ 10.00$ 60.00$ 1,500.00$ 9,000.00$ 500.00$ 3,000.00$ Bid Bid Total 3,764,126.40$ 3,786,120.00$ 4,250,530.00$ 4,363,456.00$ 4,748,874.50$ Surety
License
Sub Contractor
Tennyson
Electrical Inc. Electrical Work Graham
Contractors
Crack Sealing &
Slurry Seal
Golden Bay
Construction Underground Golden Bay
Construction Inc
Partial Item 6, 23-
25 +31-34 Item
26,35-38 + 46
Columbia
Electric, Inc. Electrical
Chrisp Company Striping and
Signage Work
Bear Electrical
Solutions, Inc.
Street Light, New
Lighting System
Nor-Cal
Concrete Inc Concrete Columbia
Electric, Inc.
Item
12,13,47,48,49,50
Cons
truction
Survey, Inc. Survey
Bond Blacktop,
Inc.
Crack
Sealing/Slurry
Seal Work
Marina
Landscape, Inc.
Landscape and
irrigation
Marina
Landscape Landscape & Irrig
a Graham
Contractors, Inc. Item 15 and 16 Lonestar
Landscapre, Inc Landscape & Irrig
a
Chrisp Company Striping A1 Trucking Trucking Los Loza
Landscape, Inc. Item 40-45 Chrisp Company Stripe and Sign Blackwell
General
Engineering,
Inc
Exploration Hole,
Storm Drain,
Water structures
Graham
Contractors Slurry Seal & Crac
kChrisp Company items 51-58 Tally Consulting
Group SWPP
10% Bid Bond
A, B, C8, C12, C27
10% Bid Bond
A,B, C8, C21, C61/D06, C50,C12,
10% Bid Bond
A, C8
10% Bid Bond
A, HAZ
10% Bid Bond
A,C113,C-32
Attachment 1
05/23/22 Bid Summary
IFB
PW23-16 Peery Park area Transportation
Improvements
(TR-18-09 Federal Aid No. CML-5213(061)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Darrell Qualls Phillip J Albanese Carlos Raposo Bob Rahebi Vinh C. Truong Chrisp Company Striping & Signs CF Archibald
Paving, Inc.
Partial item 22
also item 14
Bond Blacktop
Inc Slurry Seal
Construction
Survey Inc Surveying USA Trucking
Inc
All Trucking Off-
Hauling
Columbia
Electric Electrical
ABSL
Construction Grinding
Note:
** Bid submitted by Joseph J. Albanese, Inc., JJR Construction, Inc., and Sposeto Engineering, Inc. contains math error in the bid total. The accurte bid amount is shown. *Bid submitted by QLM-Inc. is deemed non-responsive because the submitted is incompleted (missing Non-Collision Affidavit and required Federal forms).