11/09/2023 Bid Summary
IFB
PW24-05 TRAFFIC SIGNAL FIBER OPTIC
COMMUNICATIONS PROJECT
(Project No. TR-23-03)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Recommend Not to Exceed 5% of Total Base Bid) 1 LS 18,000.00$ 18,000.00$ 35,000.00$ 35,000.00$ 33,000.00$ 33,000.00$ 17,550.00$ 17,550.00$ 58,000.00$ 58,000.00$ 59,850.00$ 59,850.00$ 2 Construction Area Traffic Control 1 LS 48,417.00$ 48,417.00$ 100,000.00$ 100,000.00$ 45,610.00$ 45,610.00$ 70,000.00$ 70,000.00$ 180,000.00$ 180,000.00$ 64,350.00$ 64,350.00$ 3 Water Pollution Control Plan 1 LS 4,850.00$ 4,850.00$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 2,000.00$ 2,000.00$ 7,000.00$ 7,000.00$ 2,500.00$ 2,500.00$ 4 Potholing 1 LS 185,000.00$ 185,000.00$ 60,000.00$ 60,000.00$ 150,000.00$ 150,000.00$ 170,000.00$ 170,000.00$ 190,000.00$ 190,000.00$ 29,500.00$ 29,500.00$ 5 Furnish And Install 3" Schedule 80 Hdpe Conduit 2,830 LF 95.00$ 268,850.00$ 70.00$ 198,100.00$ 100.00$ 283,000.00$ 70.00$ 198,100.00$ 130.00$ 367,900.00$ 125.00$ 353,750.00$ 6 Furnish And Install No. 6e Pull Box 6 EA 7,050.00$ 42,300.00$ 2,860.00$ 17,160.00$ 2,500.00$ 15,000.00$ 5,600.00$ 33,600.00$ 16,000.00$ 96,000.00$ 4,250.00$ 25,500.00$ 7 Install Project Funding Sign 2 EA 1,100.00$ 2,200.00$ 2,500.00$ 5,000.00$ 2,500.00$ 5,000.00$ 4,300.00$ 8,600.00$ 8,000.00$ 16,000.00$ 1,850.00$ 3,700.00$ 8 Furnish And Install 144-Strand Fiber Optic Cable 6,810 LF 5.00$ 34,050.00$ 15.00$ 102,150.00$ 12.00$ 81,720.00$ 6.00$ 40,860.00$ 10.00$ 68,100.00$ 13.75$ 93,637.50$ 9 Furnish And Install 12-Strand Fiber Optic Cable 340 LF 4.00$ 1,360.00$ 17.50$ 5,950.00$ 22.00$ 7,480.00$ 21.00$ 7,140.00$ 25.00$ 8,500.00$ 46.00$ 15,640.00$ 10 Furnish And Install Fiber Optic Switch 5 EA 2,660.00$ 13,300.00$ 5,733.00$ 28,665.00$ 7,000.00$ 35,000.00$ 9,000.00$ 45,000.00$ 12,000.00$ 60,000.00$ 5,450.00$ 27,250.00$ 11 Furnish And Install 12-Port Fiber Termination 4 EA 1,010.00$ 4,040.00$ 2,132.00$ 8,528.00$ 1,500.00$ 6,000.00$ 2,210.00$ 8,840.00$ 610.00$ 2,440.00$ 2,650.00$ 10,600.00$ 12 Furnish And Install Splice Enclosure 5 EA 778.00$ 3,890.00$ 2,463.00$ 12,315.00$ 2,000.00$ 10,000.00$ 3,500.00$ 17,500.00$ 3,000.00$ 15,000.00$ 1,950.00$ 9,750.00$ 13 Fiber Cable Assemblies And Installation 1 LS 39,697.00$ 39,697.00$ 25,000.00$ 25,000.00$ 22,000.00$ 22,000.00$ 50,000.00$ 50,000.00$ 31,000.00$ 31,000.00$ 38,500.00$ 38,500.00$ 14 Furnish And Install 3-Cell Fabric Innerduct With
Trace Wire 7,150 LF 4.50$ 32,175.00$ 10.67$ 76,290.50$ 5.25$ 37,537.50$ 12.00$ 85,800.00$ 10.00$ 71,500.00$ 13.75$ 98,312.50$ 15 Remove And Discard Of Existing Interconnect
Cable 3,080 LF 1.00$ 3,080.00$ 5.00$ 15,400.00$ 1.00$ 3,080.00$ 3.00$ 9,240.00$ 9.00$ 27,720.00$ 3.00$ 9,240.00$ 16 Furnish and Install Small Form Factor Pluggable 10 EA 165.00$ 1,650.00$ 800.00$ 8,000.00$ 1,000.00$ 10,000.00$ 900.00$ 9,000.00$ 600.00$ 6,000.00$ 650.00$ 6,500.00$ Bid Bid Total 702,859.00$ 707,558.50$ 749,427.50$ 773,230.00$ 1,205,160.00$ 848,580.00$ Surety
License
Sub Contractor
California Utility BKF Engineers
Incompli
George Bianchi
Quora Utility
Cleansweep
Services, Inc.
D&M Traffic
Rosendin Electric Incorporated
880 Mabury Rd.
San Jose, CA 95133
Joe Gann
10% Bid Bond
A, B, C10, C-7
WPCS International Inc.
Alfaro Communications
Construction, Inc
15614 S. Atlantic Ave
Compton, CA 90221
Hugo Alfaro
10% Bid Bond
A
Columbia Electric, Inc.
1980 Davis Street
San Leandro, CA 94577
TR Digital Inc
Tennyson Electric, LLC
7275 National Dr Unit A-2
Livermore, CA 94550
Michael A. Tennyson
10% Bid Bond
A, C-10, C-7
JoAnne Scruggs
10% Bid Bond
A
CMC Traffic Control
Gruendl Inc. DBA Ray's Electric
411 Pendleton Way Suite B
Oakland, CA 94621
Jorge Hinojosa
10% Bid Bond
A & C10
W Bradley Electric, LLC
90 Hill Road
Novato, CA 94945
Alex Llerena
10% Bid Bond
C-10, B, A
Tight Access Excavation, Inc.
Attachment 1