Cities Index.
Draft 2023 Housing Element Annual Progress Report

Sunnyvale City Council
March 26, 2024

Document
Draft 2023 Housing Element Annual Progress Report
Meeting
March 26, 2024
Body
Sunnyvale City Council
Pages
32
Original file
3.4 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Jurisdiction Sunnyvale
Reporting Year 2023
Housing Element Planning Period 6th Cycle
Current Year
Deed Restricted 131
Non-Deed
Restricted 3
Deed Restricted 43
Non-Deed
Restricted 18
Deed Restricted 45
Non-Deed
Restricted 29
332
601
Units by Structure Type Entitled Permitted Completed
Single-family Attached 140 348 79
Single-family Detached 17 18 20
2 to 4 units per structure 0 0 0
5+ units per structure 534 176 372
Accessory Dwelling Unit 25 59 39
Mobile/Manufactured Home 0 0 0
Total 716 601 510
Infill Housing Developments and Infill Units Permitted # of Projects Units 138 601
0 0
56 726
715
0 0
0 Total Housing Applications Submitted:

Number of Proposed Units in All Applications Received:

Total Housing Units Approved:

Total Housing Units Disapproved:

Total Units
Housing Applications Summary
Use of SB 35 Streamlining Provisions - Applications
Note: Units serving extremely low-income households are included in the very low-income permitted units totals Number of SB 35 Streamlining Applications
Above Moderate
Indicated as Infill
Not Indicated as Infill
Building Permits Issued by Affordability Summary
Income Level
(Jan. 1 - Dec. 31)
01/31/2023 - 01/31/2031
Number of SB 35 Streamlining Applications Approved
Very Low
Low
Moderate
Attachment 1

Page 1 of 32 ends

Income Rental Ownership Total
Very Low 0 0 0
Low 0 0 0
Moderate 0 0 0
Above Moderate 0 0 0
Total 0 0 0
Streamlining Provisions Used - Permitted Units # of Projects Units SB 9 (2021) - Duplex in SF Zone 0 0
SB 9 (2021) - Residential Lot Split 0 0
AB 2011 (2022) 0 0
SB 6 (2022) 0 0
SB 35 (2017) 0 0
Ministerial and Discretionary Applications # of Applications Units Ministerial 49 52
Discretionary 7 674
Density Bonus Applications and Units Permitted
Number of Applications Submitted Requesting a Density Bonus 6 Number of Units in Applications Submitted Requesting a Density Bonus 666 Number of Projects Permitted with a Density Bonus 9
Number of Units in Projects Permitted with a Density Bonus 252 Housing Element Programs Implemented and Sites Rezoned Count 72 28
Programs Implemented
Sites Rezoned to Accommodate the RHNA
Units Constructed - SB 35 Streamlining Permits
Attachment 1

Page 2 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining
2 3 4 6 7 8 9
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted+
(see
instructions)
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total

APPROVED
Units by project
Total

DISAPPROVED
Units by Project
Please select
streamlining
provision/s the
application was
submitted pursuant
to.

Did the housing
development
application seek
incentives or
concessions
pursuant to
Government Code
section 65915?
Summary Row: Start Data Entry Below 19 2 75 10 17 234 369 726 715 0 20117040 954

BERKSHIRE AV
PLNG-2022-
7749
ADU R
1/10/2023
1 1 1 NONE No
10428024 1225 OAK
CREEK WY 20227595 ADU R
1/11/2023
1 1 1 NONE No
21318054 770 PRIVET
CT 20227011 ADU R
1/30/2023
1 1 NONE No
16510064 383 DENNIS
AV 20227691 ADU R
2/1/2023
1 1 1 NONE No
20435006 385 N

SUNNYVALE
AV
20227626
SFD O
2/10/2023
2 2 2 SB 9 (2021) -
Residential Lot
Split
No
30949061 1667 MARTIN
AV 20227674 ADU R
2/24/2023
1 1 1 NONE No
16517055 850 LEWIS
AV
PLNG-2023-
0098
ADU R
3/3/2023
1 1 1 NONE No
21322022 938 LANTANA
DR
PLNG-2022-
7736
ADU R
3/23/2023
1 1 NONE No
21322022 938 LANTANA
DR
PLNG-2022-
7736
SFD O
3/23/2023
1 1 NONE No
10427022 1270 ORTIZ
CT 20227658 ADU R
3/24/2023
1 1 1 NONE No
20117025 704 S MARY
AV
PLNG-2022-
7712
ADU R
3/28/2023
1 1 1 NONE No
21323006 860 PAGODA
TREE CT 20217666 SFD O
4/3/2023
1 1 1 NONE No
31313008 1465 RAMON
DR 20227459 ADU R
4/13/2023
1 1 NONE No
31313008 1465 RAMON
DR 20227459 SFD O
4/13/2023
1 1 NONE No
31314053 1476 NORMAN
DR
PLNG-2023-
0171
SFD O
4/21/2023
1 1 1 NONE No
20131034 533

SUNNYMOUNT
AV
PLNG-2023-
0178
ADU R
4/26/2023
1 1 1 NONE No
16515081 747 W

WASHINGTON
AV
20217805
ADU R
5/4/2023
1 1 1 NONE No
16515081 747 W

WASHINGTON
AV
20217805
SFD O
5/4/2023
1 1 1 NONE No
16127006 238 S

BERNARDO
AV
20227639
ADU R
5/11/2023
1 1 1 NONE No
19822002 922 LOIS AV PLNG-2022-
7698
SFD O
5/11/2023
1 1 1 NONE No
21135008 148

CRESCENT
AV
20217826
SFA O
5/23/2023
2 16 18 18 NONE Yes
20223007 877 W
FREMONT AV 20217922
SFA O
6/1/2023
14 100 114 114 NONE Yes
32319007 1543

KINGSGATE
DR
PLNG-2023-
0190
ADU R
6/19/2023
1 1 1 NONE No
Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications
10 Housing Development Applications Submitted
Attachment 1

Page 3 of 32 ends

32025008 1362

FRONTENAC
AV
PLNG-2023-
0337
ADU R
6/26/2023
1 1 1 NONE No
21101031 444 OLD SAN

FRANCISCO
RD
20207112
SFA O
6/29/2023
1 7 8 8 NONE No
21346011 1226 S WOLFE
RD Unit: 1
PLNG-2023-
0230
ADU R
7/18/2023
2 2 2 NONE No
19825012 781 LOIS AV PLNG-2023-
0365
ADU R
7/24/2023
1 1 1 NONE No
20107028 934

HEATHERSTO
NE AV
PLNG-2023-
0385
ADU R
7/26/2023
1 1 1 NONE No
20929022 574 S TAAFFE
ST
PLNG-2023-
0343
ADU R
8/8/2023
1 1 1 NONE No
19813005 1221

MORNINGSIDE
DR
20227679
SFD O
8/18/2023
1 1 1 NONE No
20134004 551

CRAWFORD
DR
PLNG-2023-
0462
ADU R
8/21/2023
1 1 1 NONE No
16512045 405 WAVERLY
ST
PLNG-2023-
0545
SFD O
8/25/2023
1 1 1 NONE No
20439031 374 LASTRETO
AV
PLNG-2023-
0002
SFD O
8/25/2023
2 2 2 SB 9 (2021) -
Residential Lot
Split
No
Attachment 1

Page 4 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
Term of Affordability
or Deed Restriction Notes
2 3 5 6 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions)
Date Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Destroyed Units
Owner or
Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Summary Row: Start Data Entry Below 19 1 75 8 17 230 366 716 131 3 43 18 45 29 332 601 13 2 0 12 9 153 321 510 97 11 20117040 954 BERKSHIRE
AV PLNG-2022-7749 ADU R 1 1/10/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
10428024 1225 OAK CREEK
WY 20227595 ADU R 1 1/11/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16510064 383 DENNIS AV 20227691 ADU R 1 2/1/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20435006
385 N SUNNYVALE
AV 20227626 SFD O 2 2/10/2023 2 0 0 SB 9 (2021) -
Residential Lot Split Y
16517055 850 LEWIS AV PLNG-2023-0098 ADU R 1 3/3/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
10427022 1270 ORTIZ CT 20227658 ADU R 1 3/24/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20117025 704 S MARY AV PLNG-2022-7712 ADU R 1 3/28/2023 1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20926023 404 S MURPHY
AV 20217829 SFD O 1 4/10/2023 1 0 0 NONE Y 1 Demolished 31314053 1476 NORMAN
DR PLNG-2023-0171 ADU O 1 4/21/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31314053 1476 NORMAN
DR PLNG-2023-0171 SFD R 1 4/21/2023 1 0 0 NONE Y 1 Demolished 20131034 533 SUNNYMOUNT
AV PLNG-2023-0178 ADU R 1 4/26/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16515081
747 W

WASHINGTON
AV
20217805 ADU R 1 5/4/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16515081
747 W

WASHINGTON
AV
20217805 SFD O 1 5/4/2023
1 0 0 NONE Y
16127006 238 S BERNARDO
AV 20227639 ADU R 1 5/11/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32319007 1543 KINGSGATE
DR PLNG-2023-0190 ADU R 1 6/19/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32025008
1362 FRONTENAC
AV PLNG-2023-0337 ADU R 1 6/26/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16514020 119 CHARLES ST PLNG-2022-7797 SFD O 1 6/26/2023 1 0 0 NONE Y 1 Demolished O
21346011 1226 S WOLFE RD
Unit: 1 PLNG-2023-0230 ADU R 2 7/18/2023
2 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
19825012 781 LOIS AV PLNG-2023-0365 ADU R 1 7/24/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20929022 574 S TAAFFE
ST PLNG-2023-0343 ADU R 1 8/8/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20223007 877 W FREMONT
AV 20217922 SFA O 14 100 8/14/2023
114
0 0 NONE Y DB, INC 30 3.0%
7 Development
Standards Modification
Yes
20134004 551 CRAWFORD
DR PLNG-2023-0462 ADU R 1 8/21/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20439031 374 LASTRETO
AV PLNG-2023-0002 SFD O 2 8/22/2023 2 0 0 SB 9 (2021) - Residential Lot Split Y 1 Demolished O
16512045 405 WAVERLY
ST PLNG-2023-0545 SFD O 1 8/25/2023 1 0 0 NONE Y 1 Destroyed O 21101031 444 OLD SAN
FRANCISCO RD 20207112 SFA O 1 7 8/28/2023 8 0 0 NONE Y INC 30 1 Demolished O 21135008 148 CRESCENT
AV 20217826 SFA O 2 16 8/29/2023
18 0 0 NONE Y DB, INC 30 1 Demolished O 0.0%
6 Development
Standards Modification
Yes
20234012 1080 REMSEN
CT PLNG-2023-0308 ADU R 1 9/18/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20130026 631 W
REMINGTON DR PLNG-2023-0467 ADU R 1 10/4/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20550034 1150 KIFER RD 20227168 5+ R 8 36 90 91 10/9/2023 225
0 0 4 NONE Y DB, INC, Other Rental Project (see notes) 55 50.0% 11 Development
Standards
Modification
No
Affordability based on
the City's rent analysis
for recent rental
projects. Half of non
deed-restricted units
have rents affordable to
Moderate-income
households
32304017 798 BELFAIR CT PLNG-2023-0541 ADU R 1 10/11/2023 1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21627018 1202 KIFER RD 20217110 5+ R 1 3 12 13 10/23/2023 29 0 0 NONE Y DB, INC, Other Rental Project (see notes) 55 12.0% 6 Development
Standards
Modification
No
Affordability based on
the City's rent analysis
for recent rental
projects. Half of non
deed-restricted units
have rents affordable to
Moderate-income
households
32327048 1491 PRINCE
EDWARD WY PLNG-2023-0676 ADU R 1 10/27/2023 1 0 0 NONE Y 16512068 208 WAVERLY
ST PLNG-2023-0458 ADU R 1 10/27/2023 1 0 0 SB 9 (2021) - Residential Lot Split Y
16512068 208 WAVERLY
ST PLNG-2023-0458 SFD O 1 10/27/2023 1 0 0 SB 9 (2021) - Residential Lot Split Y
31314024 1491 NAVARRO
DR PLNG-2023-0695 ADU R 1 11/10/2023 1 0 0 NONE Y
21303053 454 PALO VERDE
DR PLNG-2023-0095 SFD O 1 11/14/2023 1 0 0 NONE Y 1 Demolished O 11016106 727 LAKEHAVEN
DR PLNG-2023-0097 SFD O 1 11/17/2023 1 0 0 NONE Y
20441006 322 JACKSON
ST PLNG-2023-0672 ADU R 1 11/27/2023 1 0 0 NONE Y
20550016 1154 SONORA
CT 20227270 5+ R 6 22 72 73 11/28/2023
173
0 0 NONE Y DB, Other, INC Rental Project (see notes) 55 50.0% 4 Development
Standards
Modification
N
Affordability based on
the City's rent analysis
for recent rental
projects. Half of non
deed-restricted units
have rents affordable to
Moderate-income
households
20550014 1170 SONORA
CT 20227271 5+ R 4 14 44 45 11/28/2023
107
0 0 NONE Y DB, Other, INC Rental Project (see notes) 55 51.0% 4 Development
Standards
Modification
N
Affordability based on
the City's rent analysis
for recent rental
projects. Half of non
deed-restricted units
have rents affordable to
Moderate-income
households
19822003 916 LOIS AV PLNG-2023-0634 SFD O 1 11/30/2023 1 0 0 NONE Y 1 Demolished O 20517006 644 JOHANNA
AV PLNG-2023-0508 SFD O 1 12/28/2023 1 0 0 NONE Y
30949061 1667 MARTIN AV 20227674 ADU R 1 2/24/2023
1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21323006 860 PAGODA
TREE CT 20217666 SFD O 1 9/19/2023 1 0 0 NONE Y
19822002 922 LOIS AV PLNG-2022-7698 SFD O 1 5/11/2023 1 0 0 NONE Y 1 Demolished O 19813005
1221

MORNINGSIDE
DR
20227679 SFD O 1 8/18/2023
1 0 0 NONE Y 1 Demolished O
20433017 335 STOWELL
AV B20224077 ADU R
0 1 1/11/2023 1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
Note: "+" indicates an optional field
Housing with Financial Assistance
and/or Deed Restrictions Demolished/Destroyed UnitsProject Identifier Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Density Bonus
1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building Permits Affordability by Household Incomes - Certificates of Occupancy 4 7 10
Attachment 1

Page 5 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Note: "+" indicates an optional field
20106045 767 HOLBROOK
PL B20223492 ADU R
0 1 1/11/2023 1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20132004 521 DAWN DR B20221948 ADU R
0 1 1/18/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20132004 521 DAWN DR B20221948 SFD O 0 1 1/18/2023 1 0 NONE Y 32029071 1282 BROOKINGS
LN B20224273 ADU R
0 1 1/31/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20932013 512 CARLYN CT B20224235 SFD O 0 1 2/15/2023 1 0 None Y 20545055 825 BIRCH AV B20215418 ADU R
0 1 2/17/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20117001 901 CAMBRIDGE
AV B20222485 SFD O 0 1 2/21/2023 1 0 NONE Y
16129068 157 ENCINO CT BLDG-2022-4809 ADU R
0 1 2/23/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
11011024 1089 FULTON AV B20223802 ADU R
0 1 2/24/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32010036 1474 S
BERNARDO AV BLDG-2022-5249 ADU R
0 1 3/1/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16512083 606 W MCKINLEY
AV B20210417 SFD O 0 1 3/1/2023 1 0 NONE Y
16512083 608 W MCKINLEY
AV B20210418 SFD O 0 1 3/1/2023 1 0 NONE Y
19818080 735 GRAPE AV BLDG-2022-5159 ADU R
0 1 3/9/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20423012 590 WAITE AV B20224538 ADU R
0 1 3/22/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21152100
922 NOBLE FIR TR
Unit: 1 Lavender B20212000 SFA O 0 1 3/22/2023 1 0 NONE Y 21152108 922 NOBLE FIR TR
Unit: 10 Lavender B20212010 SFA O 0 1 3/22/2023 1 0 NONE Y INC 30 21152103 922 NOBLE FIR TR
Unit: 5 Lavender B20212004 SFA O 0 1 3/22/2023 1 0 NONE Y 21152104 922 NOBLE FIR TR
Unit: 6 Lavender B20212005 SFA O 0 1 3/22/2023 1 0 NONE Y INC 30 21152107 922 NOBLE FIR TR
Unit: 9 Lavender B20212009 SFA O 0 1 3/22/2023 1 0 NONE Y 21152101 922 NOBLE FIR TR
Unit: 3 Lavender B20212002 SFA O 0 1 3/22/2023 1 0 NONE Y INC 30 21152106 922 NOBLE FIR TR
Unit: 8 Lavender B20212008 SFA O 0 1 3/22/2023 1 0 NONE Y 21152099 922 NOBLE FIR TR
Unit: 2 Lavender B20212001 SFA O 0 1 3/22/2023 1 0 NONE Y INC 30 21152105 922 NOBLE FIR TR
Unit: 7 Lavender B20212007 SFA O 0 1 3/22/2023 1 0 NONE Y 21152102 922 NOBLE FIR TR
Unit: 4 Lavender B20212003 SFA O 0 1 3/22/2023 1 0 NONE Y 21152109 922 NOBLE FIR TR
Unit: 11 Lavender B20212011 SFA O 0 1 3/22/2023 1 0 NONE Y 20232012
1024

HUCKLEBERRY
CT
B20224469 ADU R
0 1 3/28/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20505038 839 SAN RAMON
AV B20221833 ADU R
0 1 3/29/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20433009 363 STOWELL
AV BLDG-2023-0960 ADU R
0 1 4/6/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20517060 625 JOHANNA
AV B20224040 ADU R
0 1 4/7/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21339132 840 POPLAR AV BLDG-2022-4970 ADU R
0 1 4/7/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
11021038 359 HIDDENLAKE
DR B20223562 ADU R
0 1 4/14/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
19818026 1134 BLAIR AV BLDG-2022-4812 ADU R
0 1 4/27/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21301043 1200 ALTHEA TR
Unit: 101 1155 Aster B20201006 SFA O 0 11 74 4/27/2023 85 0 NONE Y INC 30 21301043 308 TORREY PINE
TR Unit: 101 1155 Aster B20201005 SFA O
0 13 81 4/27/2023 94 0 NONE Y INC 30
19818026 1134 BLAIR AV BLDG-2022-4812 SFD O 0 1 4/27/2023 1 0 NONE Y 20911029 425 BRYAN AV B20204645 ADU R
0 1 5/5/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20511060 984 COLUSA AV BLDG-2022-5483 ADU R
0 1 5/8/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32012061 1532 DOMINION
AV BLDG-2022-5549 ADU R
0 1 5/9/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
11016104 735 LAKEHAVEN
DR BLDG-2023-1713 ADU R
0 1 5/11/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21301044
202 TEA TREE TR
Unit: 1 1155 Aster BLDG-2023-1799 SFA O 0 1 6 5/15/2023 7 0 NONE Y INC 30 21301044 301 TEA TREE TR
Unit: 1 1155 Aster BLDG-2023-1797 SFA O 0 7 5/15/2023 7 0 NONE Y 21301044 302 TEA TREE TR
Unit: 1 1155 Aster BLDG-2023-1800 SFA O 0 1 6 5/15/2023 7 0 NONE Y INC 30 21301044 306 TEA TREE TR
Unit: 1 1155 Aster BLDG-2023-1801 SFA O 0 1 6 5/15/2023 7 0 NONE Y INC 30 30901006 1301 BARBET CL
Unit: 1 Fremont Corners BLDG-2023-2232 SFA O
0 2 9 5/22/2023 11 0 NONE Y DB 30 6.0%
10 On-Site
Improvements,
Development
Standards
Modification
Yes
30924001 142 CONNEMARA
WY B20224655 ADU R
0 1 6/6/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
30924001 142 CONNEMARA
WY B20224655 SFD O 0 1 6/6/2023 1 0 NONE Y
20118009 736 PEACH AV B20224208 ADU R
0 1 6/8/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20118009 736 PEACH AV B20224208 SFD O 0 1 6/8/2023 1 0 NONE Y 20117040 954 BERKSHIRE
AV BLDG-2023-0638 ADU R
0 1 6/19/2023 1 0 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
19834013 1018 LOIS AV B20224061 ADU R
0 1 6/28/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21152111
921 NOBLE FIR TR
Unit: 2 Lavender B20212013 SFA O 0 1 6/28/2023 1 0 NONE Y INC 30 21152115 921 NOBLE FIR TR
Unit: 6 Lavender B20212019 SFA O 0 1 6/28/2023 1 0 NONE Y 21152114 921 NOBLE FIR TR
Unit: 5 Lavender B20212018 SFA O 0 1 6/28/2023 1 0 NONE Y 21152119 921 NOBLE FIR TR
Unit: 10 Lavender B20212023 SFA O 0 1 6/28/2023 1 0 NONE Y 21152118 921 NOBLE FIR TR
Unit: 9 Lavender B20212022 SFA O 0 1 6/28/2023 1 0 NONE Y 21152117 921 NOBLE FIR TR
Unit: 8 Lavender B20212021 SFA O 0 1 6/28/2023 1 0 NONE Y 21152112 921 NOBLE FIR TR
Unit: 3 Lavender B20212014 SFA O 0 1 6/28/2023 1 0 NONE Y 21152110 921 NOBLE FIR TR
Unit: 1 Lavender B20212012 SFA O 0 1 6/28/2023 1 0 NONE Y 21152113 921 NOBLE FIR TR
Unit: 4 Lavender B20212017 SFA O 0 1 6/28/2023 1 0 NONE Y 21152116 921 NOBLE FIR TR
Unit: 7 Lavender B20212020 SFA O 0 1 6/28/2023 1 0 NONE Y 21152120 921 NOBLE FIR TR
Unit: 11 Lavender B20212024 SFA O 0 1 6/28/2023 1 0 NONE Y 16517055 850 LEWIS AV BLDG-2023-1462 ADU R
0 1 6/30/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21110006 819 PIERINO AV BLDG-2023-1453 ADU R
0 1 7/6/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
11014197 1147 KARLSTAD
DR Unit: 1 Artemis at the Square BLDG-2023-2535 SFA O
0 1 6 7/6/2023 7 0 NONE Y DB 30 0.0% 1
Development
Standards Modification
Yes
Attachment 1

Page 6 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Note: "+" indicates an optional field
11014197 1145 KARLSTAD
DR Unit: 1 Artemis at the Square BLDG-2023-2716 SFA O
0 1 7 7/6/2023 8 0 NONE Y DB 30 0.0% 1
Development
Standards
Modification
Yes
11014197 400 SIAM TR Unit:
1 Apollo at the Square BLDG-2023-2725 SFA O
0 1 8 7/6/2023 9 0 NONE Y DB 30 0.0% 1
Development
Standards Modification
Yes
20912015 311 S FAIR OAKS
AV BLDG-2023-0605 ADU R
0 1 7/10/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20113024 834 PEAR AV BLDG-2023-2011 ADU R
0 1 7/10/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20437052 434 MORSE AV BLDG-2023-0890 ADU R
0 1 7/10/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20202029 539 UTICA DR BLDG-2023-2277 ADU R
0 1 7/12/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
10427022 1270 ORTIZ CT BLDG-2023-1393 ADU R
0 1 7/19/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20230059 1225 LIME DR BLDG-2022-5605 ADU R
0 1 7/25/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32304022 791 BLANCHARD
WY BLDG-2023-0296 SFD O 0 1 7/25/2023 1 0 NONE Y
11011017 1092 ESSEX AV BLDG-2023-0471 ADU R
0 1 7/26/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20131034
533 SUNNYMOUNT
AV BLDG-2023-2311 ADU R
0 1 7/31/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21152141
932 NOBLE FIR TR
Unit: 11 Lavender B20212047 SFA O 0 1 7/31/2023 1 0 NONE Y 21152132 932 NOBLE FIR TR
Unit: 2 Lavender B20212036 SFA O 0 1 7/31/2023 1 0 NONE Y 21152133 932 NOBLE FIR TR
Unit: 3 Lavender B20212037 SFA O 0 1 7/31/2023 1 0 NONE Y 21152136 932 NOBLE FIR TR
Unit: 6 Lavender B20212042 SFA O 0 1 7/31/2023 1 0 NONE Y 21152137 932 NOBLE FIR TR
Unit: 7 Lavender B20212043 SFA O 0 1 7/31/2023 1 0 NONE Y 21152125 931 NOBLE FIR TR
Unit: 5 Lavender B20212029 SFA O 0 1 7/31/2023 1 0 NONE Y INC 30 21152124 931 NOBLE FIR TR
Unit: 4 Lavender B20212028 SFA O 0 1 7/31/2023 1 0 NONE Y 21152128 931 NOBLE FIR TR
Unit: 8 Lavender B20212032 SFA O 0 1 7/31/2023 1 0 NONE Y 21152129 931 NOBLE FIR TR
Unit: 9 Lavender B20212033 SFA O 0 1 7/31/2023 1 0 NONE Y 21152139 932 NOBLE FIR TR
Unit: 9 Lavender B20212045 SFA O 0 1 7/31/2023 1 0 NONE Y INC 30 21152134 932 NOBLE FIR TR
Unit: 4 Lavender B20212038 SFA O 0 1 7/31/2023 1 0 NONE Y 21152127 931 NOBLE FIR TR
Unit: 7 Lavender B20212031 SFA O 0 1 7/31/2023 1 0 NONE Y 21152123 931 NOBLE FIR TR
Unit: 3 Lavender B20212027 SFA O 0 1 7/31/2023 1 0 NONE Y 21152140 932 NOBLE FIR TR
Unit: 10 Lavender B20212046 SFA O 0 1 7/31/2023 1 0 NONE Y 21152138 932 NOBLE FIR TR
Unit: 8 Lavender B20212044 SFA O 0 1 7/31/2023 1 0 NONE Y 21152135 932 NOBLE FIR TR
Unit: 5 Lavender B20212039 SFA O 0 1 7/31/2023 1 0 NONE Y 21152126 931 NOBLE FIR TR
Unit: 6 Lavender B20212030 SFA O 0 1 7/31/2023 1 0 NONE Y 21152122 931 NOBLE FIR TR
Unit: 2 Lavender B20212026 SFA O 0 1 7/31/2023 1 0 NONE Y 21152131 932 NOBLE FIR TR
Unit: 1 Lavender B20212035 SFA O 0 1 7/31/2023 1 0 NONE Y 21152121 931 NOBLE FIR TR
Unit: 1 Lavender B20212025 SFA O 0 1 7/31/2023 1 0 NONE Y 21152130 931 NOBLE FIR TR
Unit: 10 Lavender B20212034 SFA O 0 1 7/31/2023 1 0 NONE Y 21301044 1108 ARTEMISIA
TR Unit: 1 1155 Aster BLDG-2023-1781 SFA O 0 8 8/3/2023 8 0 NONE Y 21301044 1111 ARTEMISIA
TR Unit: 1 1155 Aster BLDG-2023-1796 SFA O 0 1 6 8/3/2023 7 0 NONE Y INC 30 21301044 1107 ARTEMISIA
TR Unit: 1 1155 Aster BLDG-2023-1795 SFA O 0 1 6 8/3/2023 7 0 NONE Y INC 30 30901006 1303 BARBET CL
Unit: 1 Fremont Corners BLDG-2023-2260 SFA O
0 1 10 8/8/2023 11 0 NONE Y DB 30 6.0% 10
On-Site
Improvements,
Development
Standards
Modification
Yes
31313008 1465 RAMON DR BLDG-2023-1647 ADU R
0 1 8/9/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31313008 1465 RAMON DR BLDG-2023-1647 SFD O
0 1 8/9/2023 1 0 None Y
20110021 838 HANOVER
AV BLDG-2023-0648 ADU R
0 1 8/23/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31313045 937 MARION WY BLDG-2022-4853 ADU R
0 1 8/23/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31313045 937 MARION WY BLDG-2022-4853 SFD O
0 1 8/23/2023 1 0 NONE Y
11019081 262 TWINLAKE
DR B20223496 SFD O 0 1 8/25/2023 1 0 NONE Y
16127006 238 S BERNARDO
AV BLDG-2023-2249 ADU R
0 1 8/29/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
11014197 400 TONKIN TR
Unit: 1 Apollo at the Square BLDG-2023-2722 SFA O
0 1 8 8/30/2023 9 0 NONE Y DB 30 0.0% 1
Development
Standards Modification
Yes
11014197 401 SIAM TR Unit:
1 Apollo at the Square BLDG-2023-2728 SFA O
0 1 8 8/30/2023 9 0 NONE Y DB 30 0.0% 1
Development
Standards Modification
Yes
20448024 1 OAK CT BLDG-2023-0885 ADU R
0 1 9/5/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16513060 225 S MATHILDA
AV BLDG-2023-2692 ADU R
0 1 9/15/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
19827020 810 LOIS AV BLDG-2023-2175 ADU R
0 1 9/19/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
30946037
794

LONDONDERRY
DR
BLDG-2023-2215 ADU R
0 1 9/28/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32304020 786 BELFAIR CT BLDG-2023-4022 ADU R
0 1 10/5/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
30949061 1667 MARTIN AV BLDG-2023-1821 ADU R
0 1 10/6/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20435006
385 N SUNNYVALE
AV BLDG-2023-1881 SFD O 0 1 10/6/2023 1 0 NONE Y
20435006 387 N SUNNYVALE
AV BLDG-2023-2004 SFD O 0 1 10/6/2023 1 0 NONE Y
21304017 932 BLUEBONNET
DR BLDG-2023-1838 ADU R
0 1 10/12/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31314053 1476 NORMAN
DR BLDG-2023-2098 ADU R
0 1 10/16/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16513032 545 W MCKINLEY
AV BLDG-2023-0071 ADU R
0 1 10/24/2023 1 0 NONE Y ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16525060 871 LORI AV BLDG-2022-4781 SFD O 0 1 10/27/2023 1 0 NONE Y 20929022 574 S TAAFFE ST
Unit: 1 BLDG-2023-3914 ADU R
0 1 11/2/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32013047 1579 CORONACH
AV BLDG-2023-2188 ADU R 0 1 11/3/2023 1 0 NONE Y
20107028
934

HEATHERSTONE
AV
BLDG-2023-3635 ADU R
0 1 11/3/2023 1 0 NONE Y
32012025 1020 HAVRE CT BLDG-2022-5419 SFD O 0 1 11/8/2023 1 0 NONE Y 32025008 1362 FRONTENAC
AV BLDG-2023-3205 ADU R
0 1 11/9/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16505001 898 W IOWA AV BLDG-2023-1142 ADU R 0 1 11/10/2023 1 0 NONE Y 16514020 119 CHARLES ST BLDG-2022-5395 SFD O 0 1 11/10/2023 1 0 NONE Y 19825012 781 LOIS AV BLDG-2023-2379 ADU R
0 1 11/16/2023 1 0 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
Attachment 1

Page 7 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Note: "+" indicates an optional field
20101085 1029 PERSIMMON
AV BLDG-2023-2661 ADU R 0 1 11/16/2023 1 0 NONE Y
30918010 554 CARRICK CT BLDG-2022-5609 ADU R 0 1 11/17/2023 1 0 NONE Y 30918010 554 CARRICK CT BLDG-2022-5609 SFD O 0 1 11/17/2023 1 0 NONE Y 21654009 1255 LAKESIDE
DR BLDG-2023-5282 ADU R 0 1 12/1/2023 1 0 NONE Y
21654009 1253 LAKESIDE
DR BLDG-2023-5281 ADU R 0 1 12/1/2023 1 0 NONE Y
32328061 687 ENDICOTT
DR BLDG-2023-3182 ADU R 0 1 12/1/2023 1 0 NONE Y
30901006 1304 BARBET CL
Unit: 1 Fremont Corners BLDG-2023-2258 SFA O
0 1 11 12/12/2023 12 0 NONE Y DB 30 6.0% 10
On-Site
Improvements,
Development
Standards
Modification
Yes
20550013 1178 SONORA
CT Ira D. Hall Square BLDG-2022-5387 5+ R
0 131 43 2 12/22/2023 176 0 87 NONE Y LIHTC, NPLH, Other DB, Other 100% Affordable Project 85 107.0% 3 On-Site
Improvements,
Development
Standards
Modification
Yes
100% affordable project.

Additional financing
provided by Sunnyvale Housing Mitigation Fund,
Santa Clara County
Measure A, and
CalHOME MIP program
10426027
1122

BREEZEWOOD
CT
B20211148 ADU R
0 0 1 1/10/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16527006 290 N PASTORIA
AV B20204560 ADU R
0 0 1 1/18/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20569093 1050 DARWIN TR
Unit: 1 Ov8tion B20195881 SFA O 0 0 1 1/23/2023 1 NONE Y 20569092 1050 DARWIN TR
Unit: 2 Ov8tion B20195882 SFA O 0 0 1 1/23/2023 1 NONE Y 20569091 1050 DARWIN TR
Unit: 3 Ov8tion B20195883 SFA O 0 0 1 1/23/2023 1 NONE Y 20569090 1050 DARWIN TR
Unit: 4 Ov8tion B20195884 SFA O 0 0 1 1/23/2023 1 NONE Y INC 30 20569089 1050 DARWIN TR
Unit: 5 Ov8tion B20195885 SFA O 0 0 1 1/23/2023 1 NONE Y 19814057
806 S

KNICKERBOCKER
DR
B20215330 ADU R
0 0 1 1/24/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
19819049 1164 SUSAN WY B20215636 ADU R
0 0 1 2/10/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32309052 1360 LOS
ARBOLES AV B20221405 ADU R
0 0 1 2/16/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20913019 602 BRYAN AV B20221298 ADU R
0 0 1 2/16/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
30946078 719 E
HOMESTEAD RD B20192485 SFD O
0 0 1 2/21/2023 1 NONE Y
20569070 1075 DARWIN TR
Unit: 1 Ov8tion B20195858 SFA O 0 0 1 2/23/2023 1 NONE Y 20569067 1075 DARWIN TR
Unit: 2 Ov8tion B20195859 SFA O 0 0 1 2/23/2023 1 NONE Y 20569068 1075 DARWIN TR
Unit: 3 Ov8tion B20195860 SFA O 0 0 1 2/23/2023 1 NONE Y 20569069 1075 DARWIN TR
Unit: 4 Ov8tion B20195861 SFA O 0 0 1 2/23/2023 1 NONE Y 20569070 1075 DARWIN TR
Unit: 5 Ov8tion B20195862 SFA O 0 0 1 2/23/2023 1 NONE Y 16517036 875 LEWIS AV B20211152 ADU R
0 0 1 2/24/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20924007 324 E IOWA AV B20220496 SFD O 0 0 1 3/10/2023 1 NONE Y 20569071 1085 DARWIN TR
Unit: 1 Ov8tion B20195863 SFA O 0 0 1 3/13/2023 1 NONE Y 20569072 1085 DARWIN TR
Unit: 2 Ov8tion B20195864 SFA O 0 0 1 3/13/2023 1 NONE Y 20569073 1085 DARWIN TR
Unit: 3 Ov8tion B20195865 SFA O 0 0 1 3/13/2023 1 NONE Y 20569074 1085 DARWIN TR
Unit: 4 Ov8tion B20195866 SFA O 0 0 1 3/13/2023 1 NONE Y 20569075 1085 DARWIN TR
Unit: 5 Ov8tion B20195867 SFA O 0 0 1 3/13/2023 1 NONE Y 31307028
1353

THUNDERBIRD
AV
B20221445 ADU R
0 0 1 3/14/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21320012 798 S WOLFE
RD B20221841 ADU R
0 0 1 3/30/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20569084 1060 DARWIN TR
Unit: 1 Ov8tion B20195876 SFA O 0 0 1 4/5/2023 1 NONE Y 20569085 1060 DARWIN TR
Unit: 2 Ov8tion B20195877 SFA O 0 0 1 4/5/2023 1 NONE Y 20569086 1060 DARWIN TR
Unit: 3 Ov8tion B20195878 SFA O 0 0 1 4/5/2023 1 NONE Y 20569087 1060 DARWIN TR
Unit: 4 Ov8tion B20195879 SFA O 0 0 1 4/5/2023 1 NONE Y 20569088 1060 DARWIN TR
Unit: 5 Ov8tion B20195880 SFA O 0 0 1 4/5/2023 1 NONE Y 21329046 826 SWEETBAY
DR B20220869 ADU R
0 0 1 4/12/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20569105 1025 DELHI TR
Unit: 3 Ov8tion B20195907 SFA O 0 0 1 4/13/2023 1 NONE Y 20569106 1025 DELHI TR
Unit: 4 Ov8tion B20195908 SFA O 0 0 1 4/13/2023 1 NONE Y 20569107 1025 DELHI TR
Unit: 5 Ov8tion B20195909 SFA O 0 0 1 4/13/2023 1 NONE Y 20458067 326 RILAND TR 370 San Aleso B20195464 SFA O 0 0 1 4/17/2023 1 NONE Y 20458069 330 RILAND TR 370 San Aleso B20195462 SFA O 0 0 1 4/17/2023 1 NONE Y 20458070 332 RILAND TR 370 San Aleso B20195461 SFA O 0 0 1 4/17/2023 1 NONE Y 20458074 327 RILAND TR 370 San Aleso B20195457 SFA O 0 0 1 4/19/2023 1 NONE Y 20458073 329 RILAND TR 370 San Aleso B20195458 SFA O 0 0 1 4/19/2023 1 NONE Y INC 30 20458072 331 RILAND TR 370 San Aleso B20195459 SFA O 0 0 1 4/19/2023 1 NONE Y 20458071 333 RILAND TR 370 San Aleso B20195460 SFA O 0 0 1 4/19/2023 1 NONE Y 20458068 328 RILAND TR 370 San Aleso B20195463 SFA O 0 0 1 4/20/2023 1 NONE Y 32010036 1474 S
BERNARDO AV BLDG-2022-5249 ADU R
0 0 1 4/21/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20924021
368 FLORA VISTA
AV B20222002 ADU R
0 0 1 4/26/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32305030 778 BLANCHARD
WY B20203463 SFD O 0 0 1 5/4/2023 1 NONE Y
21152023
835 MIST
FLOWER TR Unit:
1 Lavender B20211918 SFA O
0 0 1 5/26/2023 1 NONE Y
21152024
835 MIST
FLOWER TR Unit:
2 Lavender B20211919 SFA O
0 0 1 5/26/2023 1 NONE Y
21152025
835 MIST
FLOWER TR Unit:
3 Lavender B20211920 SFA O
0 0 1 5/26/2023 1 NONE Y
21152026
835 MIST
FLOWER TR Unit:
4 Lavender B20211921 SFA O
0 0 1 5/26/2023 1 NONE Y
21152027
835 MIST
FLOWER TR Unit:
5 Lavender B20211922 SFA O
0 0 1 5/26/2023 1 NONE Y INC 30
21152028
835 MIST
FLOWER TR Unit:
6 Lavender B20211924 SFA O
0 0 1 5/26/2023 1 NONE Y
21152029
835 MIST
FLOWER TR Unit:
7 Lavender B20211925 SFA O
0 0 1 5/26/2023 1 NONE Y
21152030
835 MIST
FLOWER TR Unit:
8 Lavender B20211926 SFA O
0 0 1 5/26/2023 1 NONE Y INC 30
20433009 363 STOWELL
AV BLDG-2023-0960 ADU R
0 0 1 5/30/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20522040
1040 INDIAN
WELLS AV Unit:
100
Redwood Place B20194593 5+ R
0 0 13 134 135 6/13/2023 282 6 NONE Y INC, Other Rental Project (see notes) 55 Affordability based on
the City's rent analysis
for recent rental
projects. Half of non
deed-restricted units
have rents affordable to
Moderate-income
households
32308064
1306

CORDILLERAS
AV
B20211122 SFD O
0 0 1 6/15/2023 1 NONE Y
21152080
836 MIST
FLOWER TR Unit:
1 Lavender B20211980 SFA O
0 0 1 6/19/2023 1 NONE Y
21152081
836 MIST
FLOWER TR Unit:
2 Lavender B20211981 SFA O
0 0 1 6/19/2023 1 NONE Y
21152082
836 MIST
FLOWER TR Unit:
3 Lavender B20211982 SFA O
0 0 1 6/19/2023 1 NONE Y
21152083
836 MIST
FLOWER TR Unit:
4 Lavender B20211983 SFA O
0 0 1 6/19/2023 1 NONE Y INC 30
21152078 922 MOUNTAIN
ASH TR Unit: 1 Lavender B20211979 SFA O 0 0 1 6/21/2023 1 NONE Y INC 30 21152079 922 MOUNTAIN
ASH TR Unit: 2 Lavender B20211978 SFA O 0 0 1 6/21/2023 1 NONE Y 21152077 922 MOUNTAIN
ASH TR Unit: 3 Lavender B20211977 SFA O 0 0 1 6/21/2023 1 NONE Y 21152076 922 MOUNTAIN
ASH TR Unit: 4 Lavender B20211976 SFA O 0 0 1 6/21/2023 1 NONE Y 21152075 922 MOUNTAIN
ASH TR Unit: 5 Lavender B20211975 SFA O 0 0 1 6/21/2023 1 NONE Y Attachment 1

Page 8 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Note: "+" indicates an optional field
21152074 922 MOUNTAIN
ASH TR Unit: 6 Lavender B20211974 SFA O 0 0 1 6/21/2023 1 NONE Y 21152073 922 MOUNTAIN
ASH TR Unit: 7 Lavender B20211973 SFA O 0 0 1 6/21/2023 1 NONE Y 20234030 1150 S
BERNARDO AV B20214534 ADU R
0 0 1 7/5/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31312035 1371 NAVARRO
DR B20213543 ADU R
0 0 1 7/14/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31312035 1371 NAVARRO
DR B20213543 SFD O 0 0 1 7/14/2023 1 NONE Y
31326049
1509

MEADOWLARK
LN
B20215587 SFD O
0 0 1 7/18/2023 1 NONE Y
20437054 450 MORSE AV B20210036 ADU R
0 0 1 7/20/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20437054 450 MORSE AV B20210036 SFD O 0 0 1 7/20/2023 1 NONE Y 31301021 1393 HAMPTON
DR B20215001 SFD O 0 0 1 7/24/2023 1 NONE Y
20546005 830 BIRCH AV B20215267 ADU R
0 0 1 7/26/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20433017 335 STOWELL
AV B20224077 ADU R
0 0 1 8/3/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
30924001 142 CONNEMARA
WY B20224655 SFD O 0 0 1 8/8/2023 1 NONE Y
21152071 835 LILAC TR Unit:
1 Lavender B20211972 SFA O 0 0 1 8/10/2023 1 NONE Y
31341047 1643 SWIFT CT B20196027 ADU R
0 0 1 8/16/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
10417041 1398 SOCORRO
AV B20215463 SFD O 0 0 1 8/16/2023 1 NONE Y
16517068
815 W

WASHINGTON
AV
B20221413 ADU R
0 0 1 8/21/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16517068
815 W

WASHINGTON
AV
B20221413 SFD O
0 0 1 8/21/2023 1 NONE Y
21152084 921 MOUNTAIN
ASH TR Unit: 1 Lavender B20211984 SFA O 0 0 1 9/7/2023 1 NONE Y 21152093 921 MOUNTAIN
ASH TR Unit: 10 Lavender B20211993 SFA O 0 0 1 9/7/2023 1 NONE Y 21152094 921 MOUNTAIN
ASH TR Unit: 11 Lavender B20211994 SFA O 0 0 1 9/7/2023 1 NONE Y 21152095 921 MOUNTAIN
ASH TR Unit: 12 Lavender B20211996 SFA O 0 0 1 9/7/2023 1 NONE Y INC 30 21152096 921 MOUNTAIN
ASH TR Unit: 13 Lavender B20211997 SFA O 0 0 1 9/7/2023 1 NONE Y 21152097 921 MOUNTAIN
ASH TR Unit: 14 Lavender B20211998 SFA O 0 0 1 9/7/2023 1 NONE Y 21152098 921 MOUNTAIN
ASH TR Unit: 15 Lavender B20211999 SFA O 0 0 1 9/7/2023 1 NONE Y 21152085 921 MOUNTAIN
ASH TR Unit: 2 Lavender B20211985 SFA O 0 0 1 9/7/2023 1 NONE Y 21152086 921 MOUNTAIN
ASH TR Unit: 3 Lavender B20211986 SFA O 0 0 1 9/7/2023 1 NONE Y 21152087 921 MOUNTAIN
ASH TR Unit: 4 Lavender B20211987 SFA O 0 0 1 9/7/2023 1 NONE Y 21152088 921 MOUNTAIN
ASH TR Unit: 5 Lavender B20211988 SFA O 0 0 1 9/7/2023 1 NONE Y 21152089 921 MOUNTAIN
ASH TR Unit: 6 Lavender B20211989 SFA O 0 0 1 9/7/2023 1 NONE Y 21152090 921 MOUNTAIN
ASH TR Unit: 7 Lavender B20211990 SFA O 0 0 1 9/7/2023 1 NONE Y 21152091 921 MOUNTAIN
ASH TR Unit: 8 Lavender B20211991 SFA O 0 0 1 9/7/2023 1 NONE Y 21152092 921 MOUNTAIN
ASH TR Unit: 9 Lavender B20211992 SFA O 0 0 1 9/7/2023 1 NONE Y 16525071 880 LORI AV B20223206 SFD O 0 0 1 9/8/2023 1 NONE Y 19818080 735 GRAPE AV BLDG-2022-5159 ADU R
0 0 1 9/12/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21131020 581 E FREMONT
AV
Sunrise Assisted
Living B20202455 5+ R 0 0 90 9/15/2023 90 NONE Y
21152018
831 MIST
FLOWER TR Unit:
5 Lavender B20211913 SFA O
0 0 1 9/15/2023 1 NONE Y
21152019
831 MIST
FLOWER TR Unit:
6 Lavender B20211914 SFA O
0 0 1 9/15/2023 1 NONE Y
21152020
831 MIST
FLOWER TR Unit:
7 Lavender B20211915 SFA O
0 0 1 9/15/2023 1 NONE Y
21152021
831 MIST
FLOWER TR Unit:
8 Lavender B20211916 SFA O
0 0 1 9/15/2023 1 NONE Y
21152022
831 MIST
FLOWER TR Unit:
9 Lavender B20211917 SFA O
0 0 1 9/15/2023 1 NONE Y
21152014
831 MIST
FLOWER TR Unit:
1 Lavender B20211909 SFA O
0 0 1 9/18/2023 1 NONE Y
21152015
831 MIST
FLOWER TR Unit:
2 Lavender B20211910 SFA O
0 0 1 9/18/2023 1 NONE Y
21152016
831 MIST
FLOWER TR Unit:
3 Lavender B20211911 SFA O
0 0 1 9/18/2023 1 NONE Y
21152017
831 MIST
FLOWER TR Unit:
4 Lavender B20211912 SFA O
0 0 1 9/18/2023 1 NONE Y INC 30
32333050 1592 QUEBEC
CT B20210737 ADU R
0 0 1 9/21/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
31342020 1149 LONDON
AV B20220524 ADU R
0 0 1 9/29/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20208027 1152
SNOWBERRY CT B20212534 ADU R
0 0 1 9/29/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20440050 320 N BAYVIEW
AV B20223215 ADU R
0 0 1 10/2/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20924009
435 FLORA VISTA
AV B20222967 SFD O 0 0 1 10/9/2023 1 NONE Y
20420039 354 CYPRESS
AV B20213623 ADU R
0 0 1 10/12/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16510026 879 CARSON DR B20221860 ADU R
0 0 1 10/12/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20505038 839 SAN RAMON
AV B20221833 ADU R
0 0 1 10/17/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32025045 933 BONNEVILLE
WY B20220449 ADU R
0 0 1 10/18/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
20932013 512 CARLYN CT B20224235 SFD O 0 0 1 11/9/2023 1 NONE Y 30936027 1528 CONDOR
WY B20215631 ADU R 0 0 1 11/10/2023 1 NONE Y
11011017
1092 ESSEX AV
SUNNY BLDG-2023-0471 ADU O
0 0 1 11/10/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
32305031 774 BLANCHARD
WY B20221048 ADU R 0 0 1 11/29/2023 1 NONE Y
20425019 687 BORREGAS
AV B20214845 SFD O 0 0 1 11/29/2023 1 NONE Y
20106045 767 HOLBROOK
PL B20223492 ADU R
0 0 1 11/30/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
16137051
1077 W MCKINLEY
AV B20214993 SFD O 0 0 1 12/5/2023 1 NONE Y
21330042 1144 LILY AV B20213511 ADU R 0 0 1 12/6/2023 1 NONE Y 21330042 1144 LILY AV B20213511 SFD O 0 0 1 12/6/2023 1 NONE Y 31340036 1631 SPARROW
CT B20212956 ADU R 0 0 1 12/7/2023 1 NONE Y
20926052 467 CARROLL
ST B20222377 SFD O 0 0 1 12/13/2023 1 NONE Y
20422027 393 E ARBOR AV B20211236 ADU R 0 0 1 12/14/2023 1 NONE Y 20117001 901 CAMBRIDGE
AV B20222485 SFD O 0 0 1 12/14/2023 1 NONE Y
16517055 850 LEWIS AV BLDG-2023-1462 ADU R
0 0 1 12/19/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
21152100
922 NOBLE FIR TR
Unit: 1 Lavender B20212000 SFA O 0 0 1 12/20/2023 1 NONE Y 21152108 922 NOBLE FIR TR
Unit: 10 Lavender B20212010 SFA O 0 0 1 12/20/2023 1 NONE Y 21152109 922 NOBLE FIR TR
Unit: 11 Lavender B20212011 SFA O 0 0 1 12/20/2023 1 NONE Y 21152101 922 NOBLE FIR TR
Unit: 3 Lavender B20212002 SFA O 0 0 1 12/20/2023 1 NONE Y INC 30 19821026 1054 HUDSON
WY B20215469 SFD O 0 0 1 12/20/2023 1 NONE Y
Attachment 1

Page 9 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Note: "+" indicates an optional field
32301012 1387 WARNER
AV B20220176 ADU R 0 0 1 12/21/2023 1 NONE Y
11016104 735 LAKEHAVEN
DR BLDG-2023-1713 ADU R
0 0 1 12/28/2023 1 NONE Y Other ADU (see notes)
Affordability based on
ABAG's Affordability of
Accessory Dwelling
Units (2021) AFFH
assumptions
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Attachment 1

Page 10 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
1 Projection Period 3 4
RHNA Allocation by
Income Level
Projection Period -
06/30/2022-
01/30/2023
2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted 16 131 - - - - - - - - Non-Deed Restricted 3 1 - - - - - - - - Deed Restricted 31 43 - - - - - - - - Non-Deed Restricted 4 17 - - - - - - - - Deed Restricted 7 45 - - - - - - - - Non-Deed Restricted 18 29 - - - - - - - - Above Moderate 5,257 766 331 - - - - - - - - 1,097 4,160 11,966
845 597 - - - - - - - - 1,442 10,524 5 6 7
Extremely low-Income
Need 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date
Total Units
Remaining
1,484 87 - - - - - - - - 87 1,397 1,614
Please note: For the last year of the 5th cycle, Table B will only include units that were permitted during the portion of the year that was in the 5th cycle. For the first year of the 6th cycle, Table B will only include units that were permitted since the start of the planning period. Projection Period units are in a separate column.

Total RHNA
Total Units
Income Level
Very Low
Low
Extremely Low-Income Units*
Note: units serving extremely low-income households are included in the very low-income RHNA progress and must be reported as very low-income units in section 7 of Table A2. They must also be reported in the extremely low-income category (section 13) in Table A2 to be counted as progress toward meeting the extremely low-income housing need determined pursuant to Government Code 65583(a)(1). *Extremely low-income houisng need determined pursuant to Government Code 65583(a)(1). Value in Section 5 is default value, assumed to be half of the very low-income RHNA. May be overwritten.

Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1).

Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].
1,933
151
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.
99 Moderate
2,968
1,709
2,032
Please contact HCD if your data is different than the material supplied here 95 2
Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
2,817
Attachment 1

Page 11 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date of Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-Income Low-Income Moderate-Income Above Moderate- Income
Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning Minimum
Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing
Uses
2124 2135 160 5208 9627
110-44-007 1111 LOCKHEED
MARTIN WY BLDG 159
7/25/2023 296 296 1367 Shortfall of Sites 25.02 Moffett Park Activity Center/Residential
40 N/A 1959 Non-Vacant Existing industrial/R&D
building. Sites MP-1 and
MP-2 are expected to
develop concurrently.

Preliminary master plan by
Lockheed Martin shows
2,000 units on MP-1 and
MP-2. Lower-income unit
assumptions are reduced
to 25 percent because of
site size.
110-27-047 1120 INNOVATION WY 7/25/2023 43 43 86 Shortfall of Sites 1.64 Moffett Park Residential 70 N/A 172 Vacant Building demolished / vacant lot ready for
development. Initial
concept plan prepared by
property owner for 231
units in 9-story residential
building (140 u/a).
110-26-052 140 CASPIAN CT 7/25/2023 59 59 119 Shortfall of Sites 5.93 Moffett Park Activity Center 40 N/A 237 Non-Vacant One-story office building constructed in 1985.

Identified for
redevelopment in 2023-
2030 by property owner’s
preliminary phasing plan.
110-26-042 169 JAVA DR 535 7/25/2023 30 31 61 Shortfall of Sites 3.04 Moffett Park Activity Center 40 N/A 122 Non-Vacant One-story office building constructed in 1985.

Identified for
redevelopment in 2023-
2030 by property owner’s
preliminary phasing plan.
110-26-053 111 JAVA DR 7/25/2023 35 36 71 Shortfall of Sites 3.55 Moffett Park Activity Center 40 N/A 142 Non-Vacant Five-story office building constructed in 2009.

Identified for
redevelopment in 2023-
2030 by property owner’s
preliminary phasing plan.
110-33-035 241 JAVA DR 7/25/2023 78 79 158 Shortfall of Sites 3 Moffett Park Residential 70 N/A 315 Non-Vacant Building, constructed in 1980, being held vacant
(mothballed). Identified for
redevelopment in 2023-
2028 by property owner’s
preliminary phasing plan.
110-33-031 1313 GENEVA DR 7/25/2023 91 91 183 Shortfall of Sites 3.47 Moffett Park Residential 70 N/A 365 Non-Vacant One-story industrial/R&D building constructed in
1977. Identified for
redevelopment in 2023-
2028 by property owner’s
preliminary phasing plan.
110-33-033 1272 BORREGAS AV 7/25/2023 137 137 275 Shortfall of Sites 5.23 Moffett Park Residential 70 N/A 549 Non-Vacant Two-story industrial/R&D building constructed in
1978.
110-33-002 275 GIBRALTAR DR 7/25/2023 61 61 122 Shortfall of Sites 2.32 Moffett Park Residential 70 N/A 244 Non-Vacant Building demolished / parking lot
110-34-024 352 JAVA DR 7/25/2023 52 52 104 Shortfall of Sites 1.98 Moffett Park Residential 70 N/A 208 Non-Vacant One-story industrial building constructed in
1981.
000-00-000 Not Available - Moffett
Gateway Project
7/25/2023 160 160 Shortfall of Sites 3.03 Moffett Park Residential 70 N/A 320 Non-Vacant Portion of existing parking lot. Initial concept plan
prepared by property
owner for 270 units in 8-
story residential building
(88 u/a).
110-36-004 526 BALTIC WY 7/25/2023 151 151 302 Shortfall of Sites 5.76 Moffett Park Residential 70 N/A 604 Non-Vacant Two-story industrial/R&D building constructed in
1984.Building being held
vacant (mothballed).

Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
Attachment 1

Page 12 of 32 ends

110-36-003 1322 CROSSMAN AV 7/25/2023 35 35 70 Shortfall of Sites 3.49 Moffett Park Activity Center 40 N/A 140 Non-Vacant One-story industrial/R&D building constructed in
1983.Building being held
vacant (mothballed).
110-36-002 1312 CROSSMAN AV 7/25/2023 38 38 77 Shortfall of Sites 3.83 Moffett Park Activity Center 40 N/A 153 Non-Vacant One-story industrial/R&D building constructed in
1980.Building being held
vacant (mothballed).
110-36-018 1341 ORLEANS DR 7/25/2023 77 77 155 Shortfall of Sites 2.95 Moffett Park Residential 70 N/A 309 Non-Vacant One-story industrial/R&D building constructed in
1984. Building being held
vacant (mothballed).
110-36-019 1327 ORLEANS DR 7/25/2023 29 30 59 Shortfall of Sites 2.96 Moffett Park Activity Center 40 N/A 118 Non-Vacant One-story industrial/R&D building constructed in
1984. Building being held
vacant (mothballed).
110-36-006 1311 ORLEANS DR 7/25/2023 38 39 78 Shortfall of Sites 3.88 Moffett Park Activity Center 40 N/A 155 Non-Vacant One-story industrial/R&D building constructed in
1979. Building being held
vacant (mothballed).
110-36-007 1299 ORLEANS DR 7/25/2023 30 31 62 Shortfall of Sites 3.07 Moffett Park Activity Center 40 N/A 123 Non-Vacant One-story industrial/R&D building constructed in
1981.
110-36-008 1277 ORLEANS DR 7/25/2023 28 29 57 Shortfall of Sites 3.04 Moffett Park Mixed Use 36 N/A 114 Non-Vacant One-story industrial/R&D building constructed in
1979.
110-36-015 641 BALTIC WY 7/25/2023 58 58 117 Shortfall of Sites 6.22 Moffett Park Mixed Use 36 N/A 233 Non-Vacant One-story industrial/R&D building constructed in
1979.
110-36-013 1330 ORLEANS DR 7/25/2023 46 47 93 Shortfall of Sites 1.77 Moffett Park Residential 70 N/A 186 Non-Vacant One-story industrial/R&D building constructed in
1981. Building being held
vacant (mothballed).
110-36-012 1320 ORLEANS DR 7/25/2023 72 72 145 Shortfall of Sites 2.75 Moffett Park Residential 70 N/A 289 Non-Vacant Building, built in 1980, being held vacant
(mothballed)
110-36-011 1310 ORLEANS DR 7/25/2023 86 87 174 Shortfall of Sites 3.3 Moffett Park Residential 70 N/A 347 Non-Vacant Partially for lease. One- story industrial/R&D
building constructed in
1981.
110-36-010 1252 ORLEANS DR 7/25/2023 46 46 92 Shortfall of Sites 1.75 Moffett Park Residential 70 N/A 184 Non-Vacant One-story industrial/R&D building constructed in
1979.
110-37-006 1319 MOFFETT PARK
DR
7/25/2023 76 77 154 Shortfall of Sites 2.92 Moffett Park Residential 70 N/A 307 Non-Vacant One-story industrial/warehouse
building constructed in
1970
110-37-014 1315 CHESAPEAKE TR 7/25/2023 150 150 301 Shortfall of Sites 7.17 Moffett Park Activity Center/Residential
40 N/A 601 Non-Vacant Two-story office building
constructed in 1990, Two-
story office building
constructed in 1991
110-37-008 1308 E MOFFETT PARK
DR
7/25/2023 73 74 148 Shortfall of Sites 2.81 Moffett Park Residential 70 N/A 295 Non-Vacant One-story building constructed in 1979
110-37-016 1310 CHESAPEAKE TR 7/25/2023 209 209 418 Shortfall of Sites 7.96 Moffett Park Residential 70 N/A 836 Non-Vacant Two-story office building constructed in 1990
Attachment 1

Page 13 of 32 ends

Jurisdiction Sunnyvale
Reporting Year 2023 (Jan. 1 - Dec. 31)
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation 5th Cycle 2015-2023 HE Program: BMR Housing
Program
Continue to implement BMR Home Ownership Program. Review and refine BMR program guidelines and codes periodically as needed to accommodate changing market conditions and improve overall program effectiveness.

Ongoing:
2015-2023 • In 2023, 20 BMR homes were sold (escrow closed). • This program will be continued as Program H5 in the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: First Time
Home Buyer Program
Continue to implement FTHB Program; aim to assist 5-10 homebuyers per year, or as demand warrants.

Ongoing:
2015-2023
• In 2023, the City provided 2 FTHB loans.
• The City will continue the FTHB program as Policy H-2.7 in the 2023-2031 Housing Element
5th Cycle 2015-2023 HE Program: Affordable
Housing Development Assistance
Provide financial and regulatory assistance for new affordable housing development, using available funds.

Ongoing:
2015-2023
• In January 2023, no new financial or regulatory assistance was provided. • The City will continue this program as Program H6 in the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: Density
Bonus Provisions
Educate developers about density bonus incentives using outreach materials provided online and/or at the One-Stop Center. Promote use of density bonus in discussions with applicants and share the City’s density bonus calculator tool with interested developers.

Ongoing:
2015-2023
• Density bonus calculator was developed to help developers and staff analyze various options for sites. Housing projects consistently use the State Density Bonus. • The City will continue to encourage use of the State Density Bonus as Policy H-2.12 in the 2023-2031 Housing Element.
5th Cycle 2015-2023 HE Program: Home
Improvement Program
Continue to operate the Home Improvement Program to assist lower- income households with funding for housing rehabilitation and minor improvements. Assist a total of 15-20 households per year, or as demand warrants.

Ongoing:
2015-2023
• In 2023, 2 housing rehabilitation loans, 11 roof grants, and 4 home access grants were provided (total of 16 units). In addition, 5 emergency repair grants (repairing 5 total units) were provided.
• The City will continue this program with modifications as Program H11 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program: Multi-Family
Rental Property Rehabilitation
Continue to offer below-market rate financing for rehabilitation of affordable rental units, using funding sources available for this purpose.

Provide rehabilitation financing to one or more properties during the planning period.

Ongoing:
2015-2023
• The City completed its objective of providing rehabilitation financing to one property during the planning period: the Eight Trees project was awarded a $3.3M loan in 2017.

Work was completed and occupancy obtained in 2019.
• In 2023, one $490,000 award was made for the rehab of the Carroll Street Inn, a 122- unit Single Room Occupancy project (in addition to a separate $500,000 award in 2022).

Funds will be issued in 2024.
• The City will continue this program with modifications as Program H12 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program: Multi-family
Rental Property Acquisition and/or Preservation
Assist in acquisition and/or preservation, alone or in combination with rehabilitation assistance, of at least one multi-family rental property during the planning period.

Enter into first funding agreement by 2017; other
thereafter as feasible
• The City awarded a total of $10M in funds for the preservation (and expansion) of the existing affordable housing development, Orchard Gardens. The project received planning entitlements in 2021. Although the City was successful in awarding funding, the project was unable to secure its financing stack during the 2015-2023 Planning Period and is still seeking additional funding for construction. • The City will continue the program with modifications as Program H12 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program:

Neighborhood Preservation Program
Continue to implement the Neighborhood Preservation Program, with affordable housing support from the Housing Division.

Ongoing:
2015-2023
• Housing staff continued to provide ongoing support to the Neighborhood Preservation Program as needed.
• The City continues to operate the Neighborhood Preservation Unit as indicated in Policy H-6.4 of the 2023-2031 Housing Element.

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583 Attachment 1

Page 14 of 32 ends

5th Cycle 2015-2023 HE Program: Preservation
of Assisted Rental Housing
Maintain contact with owner of Life’s Garden and offer financial and other assistance to maintain the affordability of the at-risk units. Completed by 2017 • In 2023, the City worked with two rental developments with current inclusionary units that are slated to expire in 2024. City staff is working with management to ensure fair transition of affordable to market rate units, and offers funding to extend the life of affordable units as possible. No development has taken the City's offer of funding to extend the life of the inclusionary units.
• This City will continue this program with modification as Program H13 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program: Section 8
Rental
Assistance
Support the Housing Authority in its efforts to maintain adequate federal funding for Section 8. Refer residents to the Housing Authority for Section 8 and related information. Encourage landlords to participate in the program.

Ongoing:
2015-2023
• Two upcoming affordable housing developments (1178 Sonora and Meridian) received allocations of project based vouchers totalling 97 PBV units. Meridian will began leasing in early 2024; 1178 Sonora was issued building permits in December 2023. • Staff continued to refer interested households to the Housing Authority in 2023. • The City will continue this program with modifications as Program H10 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program: Anti-
Displacement Provisions
Consider developing an anti-displacement policy applicable to redevelopment or major renovation of larger rental properties. Conduct outreach on the topic with interested stakeholders before developing proposed provisions.

Begin program by 2016
• As part of Program H28 of the 2023-2031 Housing Element, the City adopted a tenant protection and relocation assistance ordinance in May 2023 to prevent displacement and provide additional relocation assistance in the event of a no fault, just cause eviction. City staff completed outreach through the City's website and social media channels. Additional outreach information and meetings will be completed in 2024. 5th Cycle 2015-2023 HE Program: Mobile Home
Park Preservation
Continue to implement current mobile home park protections and maintain mobile home park zones. In the event of mobile home park closure, enforce the Mobile Home Park Conversion requirements to provide relocation assistance to park residents.

Ongoing:
2015-2023
• In January 2023, the City continued to enforce the Mobile Home Memorandum of Understanding (MOU).
• The City will continue this program as Program H14 in the 2023-2031 Housing Element.
5th Cycle 2015-2023 HE Program: Foreclosure
Prevention
Provide information and referrals about available foreclosure services and related information through City public outreach channels.

Ongoing:
2015-2023
• The City provides foreclosure assistance and technical assistance on an as needed basis. The City used its website to inform residents of financial assistance options due to the pandemic. No BMR foreclosures occurred in 2023.
• This program will be continued as Program H15 in the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program:

Condominium Conversion Regulations
Continue to provide tenant protections through implementation of the City’s condominium conversion regulations.

Ongoing:
2015-2023
• No condo conversions for calendar year 2023.
• The City will continue to regulate the conversion of rental apartments to condominiums as part of Policy H-3.7 in the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: Consider
Modifications to Development Standards for
Accessory Dwelling Units (ADU’s)
Conduct outreach, complete analysis of ADU standards and possible modifications, and provide recommendations for public, stakeholder, and Council consideration.

Begin program by 2017
• As part of the City's ongoing ADU program, the City collaborated with neighboring jurisdictions on the Santa Clara County ADU website (aduscc.org), eventually launched in summer 2023. The website offers support to homeowners who are interested in building an ADU by providing tips to get started, budget, design, and permit a project. • The number of ADU permits issued has remained steady since 2022 and is nearly 10 times higher than ADU permits issued in 2017.
• The City will expand this program as Program H4 of the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: Retooling the
Zoning Code
Complete the Retooling project by providing a final draft of the Zoning Code for Council consideration by the end of 2015. Complete project by 2016 • While several zoning amendments have been made in recent years wtith updates to the Land Use and Transportation Element (LUTE) and several specific plans or plan updates have been adopted, portions of the retooling project remain in progress. Due to staff turnover, and subsequent lack of available staff and workload priorities, this program has been placed on hold the planning department. • This program will be continued as Program H16 in the 2023-2031 Housing Element with the goal to complete the program by 2026.
5th Cycle 2015-2023 HE Program: Residential
Sites Inventory
Maintain current inventory of potential residential and mixed use sites; provide to developers with information on incentives.

Ongoing:
2015-2023
• The City's Sites Inventory is available online in the Housing Element with adequate sites still available; further assistance is available at the One-Stop Permit Center and by phone or email to Planning and Housing staff. Many of the major housing sites included in the inventory were developed or are in the pipeline. • The City will continue this program as Program H1 in the 2023-2031 Housing Element.

Attachment 1

Page 15 of 32 ends

5th Cycle 2015-2023 HE Program: Minimum
Densities
Inform developers of policy to develop to at least 75% of General Plan density.

Ongoing:
2015-2023
• Planning staff reviews development applications to ensure that proposed projects meet this standard; this information is also highlighted in reports to Planning Commission.
• This policy will continue to be implemented as Policy H-1.4 in the 2023-2031 Housing Element.
5th Cycle 2015-2023 HE Program: Downtown
Specific Plan
Encourage provision of affordable housing by requiring BMR units to be provided on-site or within the boundaries of the Specific Plan, and by promoting density bonus incentives.

Ongoing:
2015-2023
• The DSP and Development Agreement was completed in 2020. In 2023, construction continued on a project with 53 new BMR units within the DSP. • The BMR program will continue to be implemented citywide as Program H5 in the 2023- 2031 Housing Element.
5th Cycle 2015-2023 HE Program: Accessory
Living Units
Facilitate the development of new accessory living units by making information about how to obtain permits for them available to the public.

Ongoing:
2015-2023
• ADU permitting information is available online and at One-Stop Permit Center and shared via various City channels and meetings. As stated above, the City collaborated with neighboring jurisdictions to launch the Santa Clara County ADU website (aduscc.org). The website offers support to homeowners who are interested in building an ADU by providing tips to get started, budget, design, and permit a project. • The City will expand this program as Program H4 of the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: Housing
Policies for Priority Development Areas
Consider developing specific housing policies for designated PDAs in the City through preparation of specific plans or station area plans. Begin program by 2017 Lawrence Station Area Plan (adopted in 2017 and updated in 2021), and El Camino Real Specific Plan (adopted in 2022) include new housing policies adding over 3,700 units to the Sites Inventory capacity. A third specific plan, Moffett Park Specific Plan was adopted in summer 2023 adding over 9,600 units to the City's Sites Inventory capacity. 5th Cycle 2015-2023 HE Program: Fair Housing
Program
Contract with qualified fair housing agencies to provide fair housing services to the extent funding is available. Provide fair housing brochures at City facilities and fair housing information on the City’s website, with links to HUD fair housing page. Participate in the Santa Clara County Fair Housing Task Force.

Ongoing:
2015-2023
• City provided CDBG grants to Project Sentinel for Fair Housing and Tenant Mediation services, who serves on behalf of the CIty to provide fair housing information. • Housing staff maintains webpage with current fair housing information and resources;
• Brochures and posters provided at City and partner agency facilities. • The City will continue this program with modification as Program H24 in the 2023-2031 Housing Element.
5th Cycle 2015-2023 HE Program: Accessible
Housing
Maintain procedures for reasonable accommodations in codes and permitting. Adopt accessibility updates to codes as needed. Provide grants for accessibility improvements for eligible households, and provide CDBG funds for accessibility improvements to pedestrian facilities as needed in residential neighborhoods.

Ongoing:
2015-2023
• City codes are updated; reasonable accommodation procedures are available to Planning/Building permit applicants.
• City operates Home Access Grant program.
• Throughout the planning period, the City has committed over $1 million in CDBG funding for ADA-compliant access ramps for sidewalks.
• The City will continue funding accessibility improvements as part of Program H27 in the 2023-2031 Housing Element.
5th Cycle 2015-2023 HE Program: Programs to
Address Homelessness
Provide funding for programs that seek to prevent and end homelessness and provide supportive services, such as the TBRA and WorkFirst Sunnyvale programs. Offer financing for permanent supportive housing and projects that reserve units for homeless applicants.

Ongoing:
2015-2023
The City continues to provide significant annual funding for these programs for homeless and at-risk households:
• WorkFirst Sunnyvale (390K Awarded in FY 2022)
• Tenant-Based Rental Assistance (TBRA) ($1 million in funds for FY 22-23) • Supportive Human Services ($135K in GF in FY 22/23)
The City will continue this program as Program H32 in the 2023-2301 Housing Element. 5th Cycle 2015-2023 HE Program: Special
Needs Housing Development Assistance
Include priority for special needs units in all City notices of funding availability for new housing construction, rehabilitation, and/or preservation projects. Aim to assist in the development of one new project with some units reserved for special needs tenants. Encourage developers to include advocacy groups in marketing and leasing efforts related to newly available units.

Begin program by 2016
• This priority was noted in City Housing RFP in 2015, 2020, and 2022. Two projects were funded with I/DD set asides including Meridian and Orchard Gardens. Meridian includes 23 units allocated for I/DD special needs tenants. Meridian will begin lease-up in early 2024. Orchard Gardens was awarded funding in 2020 and 2022 and is currently securing additional financing.
• In 2023, the City closed on a construction loan for 1178 Sonora Court, which includes 45 permanent supportive housing units.
• The City will continue this program as Program H35 in the 2023-2031 Housing Element.

Attachment 1

Page 16 of 32 ends

5th Cycle 2015-2023 HE Program: Housing for
Large Families and Single-Parent Households
Encourage rental developers to include units with three or more bedrooms, and to provide family-friendly common areas, open space and amenities such as on-site child care. Inform developers of the density bonus incentives for qualifying projects with child care facilities.

Ongoing:
2015-2023
• Recent rental developments include a range of unit sizes from studio to 4 bedroom.

City continues to encourage a range of sizes, as allowed by certain financing requirements, and always requires inclusionary developments to be a proportional mix as market rate sizes.
• The City will retain this Program as Policy H-5.14 in the 2023-2031 Housing Element. 5th Cycle 2015-2023 HE Program: Sustainability
and Green Building
Continue the City’s comprehensive sustainability and green building programs.

Ongoing:
2015-2023
• City offers a 5% density bonus for projects meeting green building standards. City’s Green Building program was updated in 2019. The City recently adopted new Reach Codes which went into effect in January 2021. The City actively implements the Climate Action Playbook as well through the Environmental Services Department. • In 2023, 296 residential units that used the green density bonus completed construction.
• The City will continue to implement the Green Building density bonus as Policy H-6.7 in the 2023-2031 Housing Element.
6th Cycle 2023-2031 HE Program H1.

Residential Sites Inventory
Maintain adequate capacity to meet the RHNA. Develop and maintain a web- based sites inventory that is updated regularly to identify sites suitable for housing development and to track remaining capacity.

Develop inventory in 2023; Ongoing updates 2023-2031
• In December 2023, the City adopted the 2023-2031 Housing Element with a Sites Inventory with capacity to meet the City's RHNA with a substantial buffer. HCD certification is anticipated in February 2024.
• City Housing Staff is developing the web-based Sites Inventory and No Net Loss tracking tool to monitor remaining capacity for launch in early 2024. 6th Cycle 2023-2031 HE Program H2. Rezone
Program
Approve a specific plan for the Moffett Park area and rezone sufficient land to accommodate the RHNA shortfall of 1,535 lower-income units and 3,280 above moderate-income units.
1/31/2024
• Complete. Moffett Park Specific Plan was adopted on July 11, 2023 and accomodates the City's RHNA shortfall with a substantial buffer. On January 30, 2024, City Council adopted an ordinance to allow by-right approval of residential projects on Moffett Park Specific Plan sites that were designated to meet the lower-income RHNA shortfall of 1,535 units in accordance with Gov Code 65583.2.
• An Urgency Ordinance establishing By-Right Zoning approvals for the lower-income shortfall units was adopted on February 27, 2024.
6th Cycle 2023-2031 HE Program H3. Increase
Affordable Housing Opportunities in High
Resource Areas
Rezone sites and/or increase allowed densities in Village Centers to increase capacity in lower-income sites inventory by at least 750 lower- income units in high and highest resource areas to increase housing mobility opportunities for lower-income households.

Complete rezoning by 2026
In 2023, the City held two community meetings and one City Council Study Session for the Village Centers rezone project. As part of the Housing Element update process, the City held a Study Session in March 2023 in which Council provided feedback to Staff to pursue rezoning Village Center at 30 du/acre or greater and to designate additional non- residential sites in Southern Sunnyvale for rezoning at 30 du/acre. Staff will continue the Village Centers rezone project for completion by 2026. 6th Cycle 2023-2031 HE Program H4. Accessory
Dwelling Units
Target the production of at least 80 ADUs annually and a total of 640 ADUs and/or DUOs during the planning period through the following actions:
- Amend ADU ordinance to comply with State law
- Establish ADU resources including an ADU toolkit and other resources - Promote ADU resources in Southern Sunnyvale
- Monitor production and affordability of ADUs every two years Amend ADU ordinance by July 2023;
Review ADU ordinance annually and amend to comply
with State law;
Monitor ADU affordability every other year beginning in 2025; adjust ADU assumption within 6 months if
necessary;
Implement ADU toolkit and other materials by early 2024. • The City is actively working on update the ADU ordinance to comply with recent HCD interpretation of four ADUs per parcel.
• In 2023, in collaboration with other jurisdictions in Santa Clara County the Santa Clara ADU (www.aduscc.org) website was launched. The website includes a guidebook and provides resources for homeowners who are considering building an ADU, including an overview of the process, local guidelines, budgeting, and sample floorplans. • The City will collaborate with ABAG to launch an ongoing ADU survey to monitor affordability assumptions beginning in 2024. The City will report on ADU production and affordablity and adjust assumptions in the 2024 APR. • City Housing, Planning, and Building staff are working to complete the ADU toolkit, which will offer specific development standards for ADUs for completion in 2024. 6th Cycle 2023-2031 HE Program H5. Below
Market Rate (BMR) Housing Program
Continue to implement the BMR Program citywide. Complete a feasibility study to determine if an increase to the BMR percentage for rental and ownership projects can be supported. Target the production of 1,250 very low-, 1,250 low-, and 500 moderate-income units.

Ongoing (2023-2031) implementation of BMR program;
Conduct feasibility study to analyze potential increases in the BMR percentage requirement for affordable housing
by July 2024.
• In 2023, 20 BMR homes were sold (escrow closed).
• In collaboration with other Santa Clara County jurisdictions, a Request for Proposals was issued in November 2023 to select a consultant to complete a feasibility study to increase the BMR percentage. Feasibility study to commence in spring 2024.

Attachment 1

Page 17 of 32 ends

6th Cycle 2023-2031 HE Program H6. Affordable
Housing Development Assistance.

Provide technical assistance for the development of 2,500 new deed- restricted lower-income units. Target production of 500 lower-income units in high resource areas.

Ongoing (2023-2031)
In 2023, the City provided technical assistance for three new affordable housing development projects that will create approximately 450 units of deed-restricted lower- income housing:
• City staff assisted the Ira D. Hall Square (1178 Sonora Court, 176 units) project in its construction closing.
• The City purchased the property at 295 S. Mathilda and entered into an Exlcusive Negotiating Agreement with MidPen Housing for the construction of a new development tentatively designed to construct 120 units of lower-income housing in a high resource area.
• Staff continued to support the 1171 Sonora Court (172 units) project throughout its predevelopment phase so that it is on track to secure planning entitlements in 2024. 6th Cycle 2023-2031 HE Program H7. Local
Funding Assistance for Affordable Housing
Provide $60 million in local and federal housing funding throughout the planning period for the development of 2,500 lower-income units. Target production of 500 lower-income units in high resource areas. Evaluate progress in 2027 to determine if additional actions are needed to achieve funding target.

Ongoing (2023-2031) with biennial Notices of Funding
Availability;
Mid-cycle progress check in 2027
• In 2023, the City closed on a $12.95 million construction loan for the Ira D. Hall Square (1178 Sonora Court, 176 units), which closed on construction financing in December 2023.
• Notice of Funding Availability is scheduled for a 2024 release. 6th Cycle 2023-2031 HE Program H8. New
Funding Mechanisms and Partnerships for
Affordable Housing
Implement new funding mechanisms to support the development of 2,500 lower-income units by 2024 and continuously develop relationships with partner agencies to leverage additional funding, securing over $100 million for new very low- and low-income units by 2027
Implement new funding mechanisms by 2024;
Continuously develop relationships with partner agencies to leverage additional funding by 2027
• In 2023, the City continued to advocate for increased affordable housing funding from Federal and State Governments.
• The City intends to apply for new funding resources for affordable housing development through the Prohousing Incentive Program in Fall 2024. • The City is also actively using new PLHA funding towards pre-development of affordable housing developments.
6th Cycle 2023-2031 HE Program H9. First-Time
Home Buyer Programs
Assist 5-10 low- to moderate-income homebuyers per year. Consider workforce-income loan program by 2025 and assist 5 workforce-income households.

Ongoing (2023-2021);
Consider workforce-income loan program by 2025
• In 2023, the City provided 2 FTHB loans.
• City Housing staff will design a workforce-income loan program for consideration in 2025.
6th Cycle 2023-2031 HE Program H10. Housing
Choice Voucher Rental Assistance
Support the Housing Authority in its efforts to maintain adequate federal funding for the Housing Choice Voucher program and continue to refer extremely low- and very low-income residents to the Housing Authority.

Prioritize outreach and education to landlords/property management in high resource areas and new developments. Increase Housing Choice Voucher usage in highest or high resource areas by 5 percent.

Complete by 2026.

Two upcoming affordable housing developments (1178 Sonora and Meridian) received allocations of project based vouchers totalling 97 PBV units. Meridian will began leasing in early 2024 and is located in a High Resource area; 1178 Sonora was issued building permits in December 2023. Staff has referred several interested households to Housing Authority in 2023. In 2023, City staff also assisted landlords who had issued with investigating Section 8 voucher holders who were not following Section 8 rules. 6th Cycle 2023-2031 HE Program H11. Home
Improvement Program
Expand program to assist 20-35 homeowners per year with housing home improvements to help prevent displacement of at-risk households. Promote the program on the City’s website, at City facilities, at community workshops, and through the Neighborhood Preservation Program, providing targeted outreach to neighborhoods with the greatest need for housing rehabilitation.
• Ongoing (2023-2031).
• Conduct no less than one workshop annually starting in 2023.
• Expansion of program by 2024
• In 2023, 2 housing rehabilitation loan, 11 roof grants, and 4 home access grants were provided (total of 16 units). In addition, 5 emergency repair grants (5 units) were provided.
• The City will expand program using Permanent Local Housing Allocation funds beginning no later than 2024.
6th Cycle 2023-2031 HE Program H12. Multi-
Family Rental Property Rehabilitation
Provide rehabilitation financing for at least one affordable mutlifamily project during the planning period Ongoing (2023-2031)
In 2023, one $490,000 award was made for the rehab of the Carroll Street Inn, a 122-unit Single Room Occupancy project (in addition to a separate $500,000 award in 2022). In 2024, loan agreements for both awards will be executed and funds will be issued. 6th Cycle 2023-2031 HE Program H13.

Preservation of Deed Restricted Housing
Preserve and maintain long-term affordability for 46 at-risk Below Market Rate units and minimize displacement of residents in deed-restricted Below Market Rate housing.

Ongoing (2023-2031), as affordability restrictions expire In 2023, the City worked with two rental developments with current inclusionary units that are slated to expire in 2024. City staff is working with management to ensure fair transition of affordable to market rate units, and offers funding to extend the life of affordable units as possible. No development has taken the City's offer of funding to extend the life of the inclusionary units.

Attachment 1

Page 18 of 32 ends

6th Cycle 2023-2031 HE Program H14. Mobile
Home Park Preservation
Preserve 3,862 mobile homes by continuing to implement current mobile home park protections, including the Sunnyvale Mobile Home Park Memorandum of Understanding (MOU), and maintaining mobile home park zoning. Maintain an MOU compliance committee to annually enforce rent regulations and provide resident assistance.
• Ongoing (2023-2031).
• Annually monitor rent adjustments based on inflation
and provide resident assistance on an ongoing basis
• In 2023, the City continued to enforce the Mobile Home Memorandum of Understanding (MOU) and hold meetings for the Mobile Home Compliance Committee. • In 2023, annual space rent was capped at a maximum of 75% of the CPI to maintain appropraite rate increases. No rent increase questions or concerns were brought the MCC or stafff.
• City staff and Project Sentinel are always available to residents for support with their leases and understanding rights under the MOU.
6th Cycle 2023-2031 HE Program H15.

Foreclosure Prevention Resources
Provide foreclosure assistance to 10 homeowners throughout the planning period through continuous information about available foreclosure counseling services, warnings about foreclosure-related scams, and available legal resources on the City’s website. Provide biannual social media campaigns using the City’s public outreach channels to educate residents. Provide materials in multiple languages and work with community-based organizations to distribute materials to residents most at- risk of foreclosure.

Ongoing (2023-2031). Biannual social media campaigns
starting in 2023.
• The City provides foreclosure assistance and technical assistance on an as needed basis. The City used its website to inform residents of financial assistsance options due to the pandemic. No BMR foreclosures occurred in 2023. • The City did not launch any social media campaigns to educate residents at risk-of- foreclosure. There were no calls or emails received from residents requesting assistance related to foreclousre. Additionally, most lenders will attempt to work out a forebearance agreement with residents rather than foreclose. Lastly, home prices have increased year over year so if an forebearance agreement is not reached, the resident could sell the home, most likely for more than it was purchased for. 6th Cycle 2023-2031 HE Program H16. Complete
the “Retooling the Zoning Code” Project
Accelerate housing production by adopting a comprehensive zoning code update to provide clarity of processing and permitting procedures. Complete by 2026. City Planning staff and the Office of the City Attorney will complete the Retooling the Zoning Code project by 2026.
6th Cycle 2023-2031 HE Program H17. El
Camino Real Specific Plan Commercial
Requirement
Implement a program to address the commercial requirement for 100 percent affordable housing developments in the El Camino Real Specific Plan (ECRSP) on sites zoned for mixed-use. Remove constraints to 100% affordable housing developments in high resource areas along El Camino Real to facilitate a minimum of two 100% affordable developments.

Continue to require inclusionary units within market rate developments as well.

Establish program for 100% affordable developments by
December 2023.

Due to reduced staffing and competing priorities, this zoning modifications for this program will be completed in 2024.
6th Cycle 2023-2031 HE Program H18. Usable
Open Space Requirements
Reduce potential constraints on residential development by reviewing and modifying the City’s usable open space requirements in R-2, R-3, R-4, and R- 5 zoning districts to maintain access to high quality open space while reducing the financial impact to residential development. • Complete review and modifications no later than 2026. • Annually monitor open space requirements and report
findings in the APR.
• Conduct a midcycle review of open space requirements
in 2028 and if determined to be a constraint, take action within six months to further reduce open space
requirements.
• In 2023, the City received a total of 9 complete Planning Permit applications for projects in R-2, R-3, R-4, and R-5 zoning districts, proposing a total of 37 units. Of the 9 applications, 8 were approved, 1 is pending, and 0 were denied. All approved projects met Usable Open Space requirements with one exception: 148 Cresent Ave in the R-3 Zoning District was approved using a State Density Bonus waiver to reduce Usable Open Space Requirements.
• The City will continue to review projects in the R-2, R-3, R-4, R-5 zoning districts annually to determine the impact of Usable Open Space requirements on project approval and whether waivers were granted. This review will inform modifications to Usable Open Space requirements.
• City Planning staff will review and complete modifications to usable open space requirements by 2026.
6th Cycle 2023-2031 HE Program H19. Review
Park Dedication Requirements
Affirmatively further fair housing in single family neighborhoods by reducing Park Dedication In-lieu fees for Dual Urban Opportunity lot split projects and reduce constraints on multifamily and special needs housing as further described in the 2023-2031 Housing Element.
• Establish reduced fees in 2024.
• Annually monitor fees and report findings in the APR. • Conduct a midcycle review of fees in 2027 and if
determined to be a constraint, take action within six
months to mitigate constraint.
• In 2024, City Planning staff will establish reduced Park Dedication In-Lieu fees to ensure program requirements are met.
• Upon adoption of the fee reduction in 2024, the City will monitor and report findings annually.
6th Cycle 2023-2031 HE Program H20. Housing
Development Plan Review Permit
Create new residential permit type to remove constraints on housing development and implement objective thresholds of approval. Establish new permit type by 2024.

In 2023, City Planning staff and the Office of the City Attorney began work on establishing a new residential permit type based on objective thresholds of approval.

City will implement the new permit type in 2024.
6th Cycle 2023-2031 HE Program H21. Missing
Middle Housing
Remove constraints and add incentives to the development of smaller, cost- effective housing options that are affordable for workforce-income households in higher opportunity neighborhoods as further described in the 2023-2031 Housing Element. Target production of 75 new missing middle units.

Establish regulatory modifications no later than 2025. City Planning staff will develop and establish regulatory modifications for Missing Middle housing types for adoption by 2025.

Attachment 1

Page 19 of 32 ends

6th Cycle 2023-2031 HE Program H22. Adaptive
Reuse
Evaluate whether review or approval processes and development standards are a constraint on adaptive reuse or interim reuse. If barriers to adaptive reuse or interim use are identified that State law does not already enable, modify processes and fees and/or adopt incentives as appropriate.

Establish regulatory modifications no later than 2025. City Planning staff will commence evaluation of approval process and development standards for completion by 2025.
6th Cycle 2023-2031 HE Program H23. Zoning
Code Amendments
Amend the zoning code in compliance with State law as further described in the 2023-2031 Housing Element. Complete zoning code amendments by December 2024. City Planning staff and the Office of the City Attorney will amend the zoning code in compliance with State law in 2024.
6th Cycle 2023-2031 HE Program H24. Fair
Housing Program
Ensure fair housing information is accessible to all by implementing the following:
- Contract with qualified fair housing agencies to provide comprehensive and culturally-appropriate fair housing services and/or tenant/landlord mediation to the extent funding is available.
- Provide multi-lingual fair housing brochures at City Hall, the Sunnyvale Library, Senior Center, Recreation Center, and the Columbia Neighborhood Center, and work with area organizations to disseminate information to non- English speaking populations.
- Provide fair housing information on the City’s website, including a direct link to HUD fair housing website.
- Continue to participate in the Santa Clara County Fair Housing Task Force.

Ongoing (2023-2031)
• City continued to contract with and provide CDBG and general fund funding to Project Sentinel for Fair Housing and Tenant Mediation services. Project Sentinel serves on behalf of the CIty to provide fair housing information. • Housing staff maintains webpage with current fair housing information and resources;
• Brochures and posters provided at City and partner agency facilities. 6th Cycle 2023-2031 HE Program H25.

Language Access
Evaluate City programs, services, and materials to assess language accessibility and provide multilingual resources, as appropriate, to ensure residents with limited English proficiency have accessible information.

Remove language barriers and increase accessibility to City housing programs.

Complete by 2025. City Housing staff will review the City's materials to assess language accessibility and provide new multi-lingual resources by 2025.
6th Cycle 2023-2031 HE Program H26. Renter’s
Choice Ordinance
Evaluate security deposit alternative programs and consider establishing an ordinance to provide tenants with alternatives to a traditional security deposit.

Complete by 2026. City will commence research of security deposit alternative programs and consider establishing an ordinance in 2026.
6th Cycle 2023-2031 HE Program H27. Right-to-
Lease Ordinance
Adopt a right-to-lease ordinance which requires that landlords offer renters a lease specifying a minimum one-year lease term prior to any other term lengths. Provide tenants with stability and predictability of costs during the term of their lease. Educate landlords and tenants by posting information about the ordinance on the City website, distributing mailers and/or fliers to landlords and tenants throughout the city, and conducting a social media campaign.

Adopt ordinance and conduct public outreach in 2023.
• City Council adopted the Right-to-Lease ordinance in May 2023, requiring landlords of most rental properties to offer a 12-month lease prior to offering a shorter term. • Information about the ordinance was posted on the City's website and announced on the City's social media channels. Additional outreach is planned for 2024. 6th Cycle 2023-2031 HE Program H28.

Relocation Assistance Ordinance
Disincentivize actions that lead to displacement and ensure displaced tenants have adequate resources to find new housing. Adopt a relocation assistance ordinance which requires landlords to provide financial assistance to tenants who are being displaced from rental units due to no- fault just cause factors. Educate landlords and tenants by posting information about the ordinance on the City website, distributing mailers and/or fliers to landlords and tenants throughout the city, and conducting a social media campaign.

Adopt ordinance and conduct public outreach in 2023.
• City Council adopted a Tenant Protection/Relocation Assistance ordinance in May 2023 requiring landlords of most rental properties to provide two-month's relocation assistance in the event of a no-fault just cause eviction. The ordinance extended AB 1482 renter protections to units built within the last 15 years. • Information about the ordinance was posted on the City's website and announced on the City's social media channels. Additional outreach is planned for 2024. 6th Cycle 2023-2031 HE Program H29.

Emergency Rental Assistance Program
Partner with local nonprofits who operate emergency rental subsidy programs to prioritize support for at-need households on existing waiting lists. Secure funding for emergency rental assistance for 25 lower-income households per year.

Secure funding for emergency rental assistance by 2024.

Emergency rental assistance provided on an ongoing
basis.

City Housing staff will coordinate with local nonprofits to secure emergency rental assistance funds in 2024.
6th Cycle 2023-2031 HE Program H30. Funding
for Accessibility Improvements
Provide grants to income-qualified households for accessibility improvements, and continue to provide CDBG funding, when available, for accessibility improvements to pedestrian facilities as needed in residential neighborhoods. Ensure lower-income residents can afford repairs on limited or fixed incomes and ensure neighborhoods remain ADA compliant.

Serve up to 10 households per year.

Ongoing (2023-2031)
• City operates Home Access Grant program and allocates over $150,000 annually towards the program.
• City committed $448,000 in CDBG funding for ADA-compliant access ramps for sidewalks in 2022/23. The City will continue to fund this program using unallocated CDBG funds annually.

Attachment 1

Page 20 of 32 ends

6th Cycle 2023-2031 HE Program H31.

Reasonable Accommodations and Code
Updates
Remove barriers to housing for persons with disabilities by reviewing and revising findings for reasonable accommodations to remove constraints to housing for persons with disabilities and to reduce the burden of the applicant to determine alternative accommodations that provide an equivalent level of benefit.

Complete by 2024. City Planning staff will prepare to complete review of reasonable accomodations findings in 2024.
6th Cycle 2023-2031 HE Program H32. Programs
to Address Homelessness
Continue to provide funding for programs that seek to prevent and end homelessness and provide supportive services to homeless and at-risk clients. Continue to implement programs such as WorkFirst Sunnyvale and Tenant-Based Rental Assistance. Provide annual funding for homeless programs and at-risk households to serve at least 150 households per year.

Using new funding sources, implement new rental assistance program for seniors experiencing homelessness.

Implement new funding sources in 2023, ongoing (2023-
2031) once implemented.

City continues to provide significant annual funding for these programs for homeless and at-risk households:
• WorkFirst Sunnyvale ($355K Awarded in FY 2023/24)
• Tenant-Based Rental Assistance (TBRA) ($2 million in funds for FY 22/23 and 23/24) • Supportive Human Services ($135K in GF annually)
6th Cycle 2023-2031 HE Program H33. Capital
Projects to Address Homelessness
Collaborate with property owners and affordable housing developers to identify sites throughout the City for projects serving tenants experiencing homelessness. Provide City funding in partnership with County funds to support the creation of 300 units serving tenants experiencing homelessness.
• Identify at least one project site for tenants experiencing homelessness in 2024.
• Award funds to projects serving tenants experiencing
homelessness through biennial notices of funding
availability for development projects.
• In 2023, the City worked with MidPen Housing to identify and purchase a site for the development of a project that will serve persons experiencing homelessness. The City entered into an Exclusive Negotiating Agreement with the MidPen for the development of an affordable housing project with at least 25% of units set aside for families experiencing homelessness.
• The City will include a priority for projects that serve households experiencing homelessness in the planned 2024 Notice of Funding Availability. 6th Cycle 2023-2031 HE Program H34. Safe RV
Parking
Support the establishment of a safe RV parking program and identify at least one potential site.

Commence study in 2023 and implement by 2025.

In 2023, the City began studying for Safe RV Parking programs throughout the county.

The City also created a new position, the Homeless Services Manager, to continue the study in 2024 for implementation in 2025.
6th Cycle 2023-2031 HE Program H35. Special
Needs Housing Development Assistance
Support the creation of a minimum of 50 dedicated units for special needs tenants, within various affordable housing developments. Include priority for special needs units in City notices of funding availability for new housing construction, rehabilitation, and/or preservation projects. Aim to assist in the development of at least one new project with some or all of the units reserved for special needs tenants.

Complete by 2031.
• In 2023, construction neared completion for the Meridian (formerly Block 15) affordable housing project, which includes 23 units for households with a member with intellectual and developmental disabilities. The Meridian will complete construction and begin leasing in 2024.
• City Staff will include priority for special needs units in the planned 2024 Notice of Funding Availability.
6th Cycle 2023-2031 HE Program H36. New Age-
Friendly Housing
Promote the devlopment of new age-friendly housing with the objective of 15 percent of new or renovated units (10 percent ADA plus an additional 5 percent age friendly) to meet age friendly housing criteria.

Complete by 2023.

City Staff will include priority for units that meet age-friendly housing criteria in the planned 2024 Notice of Funding Availability. The City prioritized senior funding in 2022 as well, however no development met the criteria.
6th Cycle 2023-2031 HE Program H37. Age in
Place
Facilitate ability of seniors to “age in place” and assist 10-25 senior households per year with age-in-place repairs. Establish a streamlined permitting process for home renovations for permits that cannot be issued over the counter. Expand Home Improvement Program using additional funding sources. Improve and expand outreach to Sunnyvale Senior Center and senior-focused housing nonprofits and policy groups to increase awareness and program referrals.

Complete by 2024.
• In 2023, 2 housing rehabilitation loan, 11 roof grants, and 4 home access grants were provided (total of 16 units). In addition, 0 paint grant, and 5 emergency repair grants (5 units) were provided.
• City staff will identify repair types for additional permit streamlining in 2024. • The City will use additional funding sources such as Permanent Local Housing Allocation to expand program in 2024.
6th Cycle 2023-2031 HE Program H38.

Neighborhood Conditions Survey
Conduct a Neighborhood Conditions Survey every 5 years to preserve and improve neighborhood quality. Conduct survey in 2025 and every 5 years thereafter. City Housing staff will coordinate with Neighborhood Preservation staff to plan survey for 2025 implementation.

Attachment 1

Page 21 of 32 ends

6th Cycle 2023-2031 HE Program H39. Prioritize
Capital Improvement Program (CIP)
Continue prioritizing public infrastructure and grant funding for projects in northern Sunnyvale, as demonstrated over the past ten years, as population growth occurs in these regions. Establish, or collaborate on establishing locations for and implement a new library branch, park facilities, and school site within low or moderate resource areas. Continue progress on the City’s Vision Zero plan by completing bicycle and pedestrian improvements for the Safe Routes to School project and in other high injury areas to reduce pedestrian and cyclist fatalities. • Annually review capital improvement projects and
funding priorities.
• Open a new library, and additional City park facilities by 2029.
• Collaborate with the local school districts on future school sites by 2031.
• Complete Vision Zero improvements on an ongoing
basis with annual progress updates
• The City continued commitments to major Capital Improvement Projects in Northern Sunnyvale in 2023. Major Capital Improvement Projects were predominantly located in Northern Sunnyvale, including the new Lakewood Branch Library ($23M), SNAIL Neighborhood Traffic Improvement ($5.3M), and Evelyn Avenue Multi-Use Trail ($4.1M).

Beginning in 2024, the City will annually review Major Capital Improvement projects to ensure funding is prioritized in Northern Sunnyvale.
• The City is actively working on the new Lakewood Branch Library in Northern Sunnyvale. In 2023, plans were completed and building permits are currently in review.

Project is estimated to be complete by the end of 2025. • The City continues to plan for additional park facilities which are slated to be complete by 2029.
• Staff continutes to have discussions on potential school sites in Northern Sunnyvale or within the MPSP plan area.
• The City continued implementation of the Vision Zero plan with the goal of reducing roadway fatalities and injuries by 50% by 2029. Active projects include Safe Routes to School Improvements in Lakewood, SNAIL, Braly Corners, and Peery Park neighborhoods in Northern Sunnyvale.
6th Cycle 2023-2031 HE Program H40. Prioritize
ADA and Pedestrian Infrastructure
Over $50 million is budgeted to repair sidewalks over next 20 years; identify locations within low and moderate resource areas to repair earlier in timeline. Construct 100 new ADA curb ramps within low and moderate resource areas by 2025.

Complete by 2025.
• City committed $448,000 in CDBG funding for ADA-compliant access ramps for sidewalks in 2022 and will continue to prioritize unallocated CDBG funds towards this use annually.
6th Cycle 2023-2031 HE Program H41.

Prohousing Designation
Increase the City’s competitiveness in receiving affordable housing funding from the State by pursuing and maintaining the State’s Prohousing Designation by demonstrating a sufficient number of polices that significantly contribute to accelerating housing production.

Complete by 2023.

In 2023, the City re-submitted a Prohousing Designation Program application for review and received positive feedback from HCD staff. In 2024, once the City's 2023-2031 Housing Element is certified, City Staff will re-submit this application to secure Prohousing Designation.
6th Cycle 2023-2031 HE Program H42.

Infrastructure Priority for Affordable Housing
Ensure compliance with State law by establishing procedures for granting priority water and sewer service to developments with lower-income units in compliance with California Government Code Section 65589.7.

Complete by 2023. No work on completed on this projects in 2023. In 2024, the City will ensure compliance with state law.
6th Cycle 2023-2031 HE Program H43. Objective
Design Standards
Streamline residential development and ensure compliance with State law by adopt new objective design standards for multifamily and residential mixed-use development consistent with State law.

Adopt by 2023. Complete. In June 2023, the City adopted Objective Design Standards for Multi-Family Residential and Mixed-Use Developments.
6th Cycle 2023-2031 HE Program H44. Review
Development Fees
Ensure planning and development impact fees are not a constraint on housing production by reviewing the City’s planning and development impact fees. Reconfirm the relationship between required services and fees paid and add further gradations of unit sizes (e.g., square footage-based fees) to reduce financial disincentives to build smaller units. Review and consider whether reductions or alternatives for addressing development impacts are appropriate.

Complete by 2026.

City Planning and Housing staff will coordinate to complete review of development fees by 2026.
6th Cycle 2023-2031 HE Program H45. East
Sunnyvale Industrial to Residential Rezoning
Clarify allowable residential capacity in the East Sunnyvale area (700 units) by rezoning the future opportunity sites in the East Sunnyvale Industrial to Residential area at Stewart and De Guigne Drives to Medium Density Residential zoning.

Complete by 2026. City Planning staff will prepare to complete reszoning by 2026.

Attachment 1

Page 22 of 32 ends

General Comments
Attachment 1

Page 23 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
Attachment 1

Page 24 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
The description should adequately document how each
unit complies with subsection (c) of Government Code
Section 65583.1+.

For detailed reporting requirements, see the chcklist
here:

Extremely Low-
Income+ Very Low-Income+ Low-Income+ TOTAL UNITS+
Extremely Low-
Income+
Very Low-
Income+ Low-Income+ TOTAL UNITS+
https://www.hcd.ca.gov/community-
development/docs/adequate-sites-checklist.pdf
Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Mobilehome Park Preservation
Total Units by Income
Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.

Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.

Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020
Attachment 1

Page 25 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Note: "+" indicates
an optional field
Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Notes
2 3 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit Category
(2 to 4,5+)
Tenure
R=Renter
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate- Income
Deed Restricted
Moderate-
Income Non Deed
Restricted
Above
Moderate-
Income
Total Moderate Income Units
Converted from Above
Moderate
Date Converted Notes
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0
Table F2
Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA
Attachment 1

Page 26 of 32 ends

Jurisdiction Sunnyvale
Reporting Period 2023 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
2 3 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Realistic Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
20550013 1178 SONORA
CT
Ira D. Hall Square BLDG-2022-5387
176 MP Sonora Court Associates,
LP
176-unit affordable housing
development, currently under
construction
16513064 295 S MATHILDA
AV

N/A N/A
18 MidPen Housing Corporation 100% affordable housing development, currently in predevelopment phase
16513051 495 W MCKINLEY
AV

N/A N/A
5 MidPen Housing Corporation 100% affordable housing development, currently in predevelopment phase
16513052 475 W MCKINLEY
AV

N/A N/A
25 MidPen Housing Corporation 100% affordable housing development, currently in predevelopment phase
16514053 260 CHARLES ST

N/A N/A
9 MidPen Housing Corporation 100% affordable housing development, currently in predevelopment phase
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.

Attachment 1

Page 27 of 32 ends

Jurisdiction Sunnyvale Note: "+" indicates an optional field Reporting Period 2023
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
NOTE: This table must contain an invenory of ALL
surplus/excess lands the reporting jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
For Santa Clara County jurisdictions, please format the APN's as follows:999-99-999 Attachment 1

Page 28 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Project Type Date
Units (Beds/Student
Capacity) Granted
Density Bonus
Notes
2 3 5 6
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing) Date Very Low- Income
Deed Restricted
Very Low- Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income Non
Deed Restricted
Moderate- Income
Deed Restricted
Moderate- Income
Non Deed
Restricted
Above
Moderate-
Income
Total Additional Beds
Created Due to Density
Bonus
Notes
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This
table only needs to be completed if there were student housing projects WITH a density bonus approved pursuant to Government Code65915(b)(1)(F)
Annual Progress Report January 2020
Attachment 1

Page 29 of 32 ends

Jurisdiction Sunnyvale ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2023 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031
NoDoes the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage on their internet website containing authorizing local ordinance and supporting materials.

Notes
Table K
Tenent Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese).

Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational.

Attachment 1

Page 30 of 32 ends

Jurisdiction Sunnyvale
Reporting Year 2023 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.

Task $ Amount Awarded $ Cumulative Reimbursement
Requested
Other
Funding Notes
Santa Clara County Planning
Collaborative $14,500.00 $0.00 Other
Additional funding provided by member juridictions
of the Santa Clara County Planning Collaborative. No
reimbursements in 2023.

Housing Element Update of the
General Plan $175,000.00 $0.00 REAP
Additional local funding; No Reimbursements in
2023.

Village Center Development
Standards and Design Guidelines $310,500.00 $0.00
Local
General
Fund No Reimbursements in 2023.

ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
In Progress
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable.
500,000.00$
Task Status
Completed
In Progress
Attachment 1

Page 31 of 32 ends

Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year
Deed Restricted 19
Non-Deed Restricted 1
Deed Restricted 75
Non-Deed Restricted 8
Deed Restricted 17
Non-Deed Restricted 230
366
716
Current Year
Deed Restricted 131
Non-Deed Restricted 3
Deed Restricted 43
Non-Deed Restricted 18
Deed Restricted 45
Non-Deed Restricted 29
332
601
Current Year
Deed Restricted 13
Non-Deed Restricted 2
Deed Restricted 0
Non-Deed Restricted 12
Deed Restricted 9
Non-Deed Restricted 153
321
510
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
Attachment 1

Page 32 of 32 ends
← All documents from this meeting