04/2/24 Bid Summary
IFB
PW24-09 Peery Park area Transportation
Improvements - ReBid
(TR-18-09 Federal Aid No. CML-5213(061)
DBE Goal 23%
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total 1 Traffic Control System 1 LS 205,505.00$ 205,505.00$ 328,900.00$ 328,900.00$ 200,000.00$ 200,000.00$ 2 Mobilization (5% Max of Total Bid) 1 LS 180,000.00$ 180,000.00$ 185,000.00$ 185,000.00$ 120,000.00$ 120,000.00$ 3 Storm Water Pollution Prevention 1 LS 50,000.00$ 50,000.00$ 85,000.00$ 85,000.00$ 55,800.00$ 55,800.00$ 4 Construction Survey 1 LS 23,000.00$ 23,000.00$ 65,000.00$ 65,000.00$ 19,000.00$ 19,000.00$ 5 Monument Preservation (incl. Pre-construction and
Post-construction) 1 EA 6,500.00$ 6,500.00$ 2,000.00$ 2,000.00$ 2,200.00$ 2,200.00$ 6 Exploration Hole (Potholing) 1 LS 30,000.00$ 30,000.00$ 78,500.00$ 78,500.00$ 27,000.00$ 27,000.00$ 7 Clearing and Grubbing, Excavation, Grading, and
Earthwork 1 LS 170,000.00$ 170,000.00$ 204,500.00$ 204,500.00$ 57,000.00$ 57,000.00$ 8 Import Fill 1 LS 105,000.00$ 105,000.00$ 15,000.00$ 15,000.00$ 170,000.00$ 170,000.00$ 9 Site Preparation & Plant Protection 1 LS 72,000.00$ 72,000.00$ 48,000.00$ 48,000.00$ 84,000.00$ 84,000.00$ 10 Remove Concrete and Base (Miscellaneous) 1 LS 75,000.00$ 75,000.00$ 325,000.00$ 325,000.00$ 154,000.00$ 154,000.00$ 11 Remove Asphalt Pavement and Base 1,990 CY 74.00$ 147,260.00$ 50.00$ 99,500.00$ 240.00$ 477,600.00$ 12 Remove Existing Street Light and Foundation 15 EA 2,050.00$ 30,750.00$ 1,350.00$ 20,250.00$ 1,670.00$ 25,050.00$ 13 Remove Existing Street Light Conduits and Boxes 1 LS 6,435.00$ 6,435.00$ 5,000.00$ 5,000.00$ 5,800.00$ 5,800.00$ 14 Profile Grind 14,780 SF 1.00$ 14,780.00$ 1.30$ 19,214.00$ 1.40$ 20,692.00$ 15 Crack Sealing (Final Pay) 1 LS 12,900.00$ 12,900.00$ 11,500.00$ 11,500.00$ 17,600.00$ 17,600.00$ 16 Type II Slurry Seal Surfacing 5,390 SY 7.50$ 40,425.00$ 6.60$ 35,574.00$ 12.90$ 69,531.00$ 17 Minor Concrete (Curb and Gutter and Base) 4,344 LF 69.50$ 301,908.00$ 75.00$ 325,800.00$ 65.00$ 282,360.00$ 18 Minor Concrete (Sidewalk and Base) 25,900 SF 13.50$ 349,650.00$ 16.00$ 414,400.00$ 16.00$ 414,400.00$ 19 Minor Concrete (Driveway and Base) 5,602 SF 26.00$ 145,652.00$ 28.00$ 156,856.00$ 18.00$ 100,836.00$ 20 Minor Concrete (Curb Ramp and Base) 10 EA 5,420.00$ 54,200.00$ 4,700.00$ 47,000.00$ 4,625.00$ 46,250.00$ 21 Minor Concrete (Vertical Curb and Base) 418 LF 60.00$ 25,080.00$ 100.00$ 41,800.00$ 64.00$ 26,752.00$ 22 Hot Mix Asphalt Paving 600 TON 254.00$ 152,400.00$ 220.00$ 132,000.00$ 320.00$ 192,000.00$ 23 24" Curb Drop Inlet 6 EA 3,600.00$ 21,600.00$ 10,140.00$ 60,840.00$ 5,200.00$ 31,200.00$ 24 Type OS Inlet 1 EA 4,150.00$ 4,150.00$ 8,500.00$ 8,500.00$ 6,500.00$ 6,500.00$ 25 Modified Type GO Inlet 2 EA 5,400.00$ 10,800.00$ 11,500.00$ 23,000.00$ 7,500.00$ 15,000.00$ 26 Christy V12 Drain Box (H-20 Traffic Rated) 6 EA 2,220.00$ 13,320.00$ 3,300.00$ 19,800.00$ 1,200.00$ 7,200.00$ Sposeto Engineering, Inc.
4558 Contrctors Place
Livermore, CA 94551
Vinh C. Truong
Joseph J Albanese
851 Martin Ave.

Santa Clara, CA 95050
Phillip J Albanese
Redgwick Construction Company
21 Hegenberger Ct
Oakland, CA 94621
Bob Rahebi
Attachment 1

Page 1 of 3 ends

05/23/22 Bid Summary
IFB
PW24-09 Peery Park area Transportation
Improvements - ReBid
(TR-18-09 Federal Aid No. CML-5213(061)
DBE Goal 23%
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Vinh C. TruongPhillip J Albanese Bob Rahebi
27 Christy V12 Drain Box (Pedestrian Traffic) 20 EA 2,075.00$ 41,500.00$ 1,850.00$ 37,000.00$ 1,200.00$ 24,000.00$ 28 2" Sidewalk Drain 182 LF 35.00$ 6,370.00$ 28.00$ 5,096.00$ 26.00$ 4,732.00$ 29 3" Sidewalk Drain 320 LF 47.00$ 15,040.00$ 33.00$ 10,560.00$ 26.00$ 8,320.00$ 30 4" PVC SDR-35 Perforated Storm Drain Pipe 139 LF 79.00$ 10,981.00$ 75.00$ 10,425.00$ 32.00$ 4,448.00$ 31 6" PVC SDR-26 Storm Drain Pipe 75 LF 57.00$ 4,275.00$ 480.00$ 36,000.00$ 210.00$ 15,750.00$ 32 12" PVC SDR-26 Storm Drain Pipe 49 LF 65.00$ 3,185.00$ 520.00$ 25,480.00$ 450.00$ 22,050.00$ 33 18" Reinforced Concrete Storm Drain Pipe (Class
III) 60 LF 260.00$ 15,600.00$ 660.00$ 39,600.00$ 540.00$ 32,400.00$ 34 24" Reinforced Concrete Storm Drain Pipe (Class
III) 10 LF 315.00$ 3,150.00$ 850.00$ 8,500.00$ 850.00$ 8,500.00$ 35 Storm Drain Manhole 1 EA 7,800.00$ 7,800.00$ 18,000.00$ 18,000.00$ 14,000.00$ 14,000.00$ 36 Concrete Pipe Collar 1 EA 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$ 2,400.00$ 2,400.00$ 37 Convert Existing Inlet to Storm Drain Manhole 6 EA 8,100.00$ 48,600.00$ 7,500.00$ 45,000.00$ 5,000.00$ 30,000.00$ 38 Remove Existing Storm Drain Manhole 4 EA 4,000.00$ 16,000.00$ 4,000.00$ 16,000.00$ 1,800.00$ 7,200.00$ 39 No Pedestrian Crossing Barricade 2 EA 1,650.00$ 3,300.00$ 1,800.00$ 3,600.00$ 1,200.00$ 2,400.00$ 40 Planting 1 LS 247,670.00$ 247,670.00$ 175,000.00$ 175,000.00$ 281,755.00$ 281,755.00$ 41 Landscape Soil Import 1 LS 76,135.00$ 76,135.00$ 45,000.00$ 45,000.00$ 86,700.00$ 86,700.00$ 42 Drain Rock 1 LS 13,750.00$ 13,750.00$ 5,800.00$ 5,800.00$ 11,400.00$ 11,400.00$ 43 Cobbles at Curb Outlet 1 LS 4,500.00$ 4,500.00$ 2,500.00$ 2,500.00$ 2,000.00$ 2,000.00$ 44 Maintenance Period 1 LS 9,800.00$ 9,800.00$ 12,000.00$ 12,000.00$ 11,200.00$ 11,200.00$ 45 New Irrigation System 1 LS 250,000.00$ 250,000.00$ 202,000.00$ 202,000.00$ 315,000.00$ 315,000.00$ 46 Water Meter for New Irrigation System 1 EA 20,000.00$ 20,000.00$ 14,000.00$ 14,000.00$ 6,000.00$ 6,000.00$ 47 Street Light w/ Foundation per City Std Detail 5 EA 20,000.00$ 100,000.00$ 16,500.00$ 82,500.00$ 20,000.00$ 100,000.00$ 48 Street Light w/ Foundation per Modified Structural
Detail 1 5 EA 20,000.00$ 100,000.00$ 16,700.00$ 83,500.00$ 20,500.00$ 102,500.00$ 49 Street Light w/ Foundation per Modified Structural
Detail 2 6 EA 20,000.00$ 120,000.00$ 17,500.00$ 105,000.00$ 21,000.00$ 126,000.00$ 50 New Lighting System 1 LS 255,000.00$ 255,000.00$ 197,000.00$ 197,000.00$ 243,000.00$ 243,000.00$ 51 Remove Striping, Pavement Markers and
Pavement Markings 1 LS 10,000.00$ 10,000.00$ 12,500.00$ 12,500.00$ 10,500.00$ 10,500.00$ 52 Striping (12-in White) 383 LF 11.00$ 4,213.00$ 10.00$ 3,830.00$ 12.00$ 4,596.00$ 53 Striping (Detail 22) 2,076 LF 9.00$ 18,684.00$ 8.25$ 17,127.00$ 10.00$ 20,760.00$ 54 Pavement Markings 234 SF 11.00$ 2,574.00$ 10.00$ 2,340.00$ 13.00$ 3,042.00$ 55 Red Curb (2-coat) 673 LF 7.00$ 4,711.00$ 6.00$ 4,038.00$ 7.00$ 4,711.00$ 56 Blue Retroreflective Pavement Marker 7 EA 40.00$ 280.00$ 35.00$ 245.00$ 44.00$ 308.00$ Attachment 1

Page 2 of 3 ends

05/23/22 Bid Summary
IFB
PW24-09 Peery Park area Transportation
Improvements - ReBid
(TR-18-09 Federal Aid No. CML-5213(061)
DBE Goal 23%
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Vinh C. TruongPhillip J Albanese Bob Rahebi
57 Roadside Sign (New Sign on New Post) 12 EA 630.00$ 7,560.00$ 545.00$ 6,540.00$ 675.00$ 8,100.00$ 58 Roadside Sign (New Sign on Existing Post or New
Streetlight Pole) 18 EA 515.00$ 9,270.00$ 445.00$ 8,010.00$ 550.00$ 9,900.00$ 59 Adjust Irrigation Heads 1 LS 15,000.00$ 15,000.00$ 4,000.00$ 4,000.00$ 23,000.00$ 23,000.00$ 60 Adjust City Drainage Inlet Frame to Grade 2 EA 2,200.00$ 4,400.00$ 2,700.00$ 5,400.00$ 3,000.00$ 6,000.00$ 61 Adjust City Water Valve Cover to Grade 26 EA 1,000.00$ 26,000.00$ 800.00$ 20,800.00$ 125.00$ 3,250.00$ 62 Adjust City Water Meter Cover to Grade 9 EA 2,000.00$ 18,000.00$ 400.00$ 3,600.00$ 125.00$ 1,125.00$ 63 Protect City Fire Hydrant in Place 6 EA 6,500.00$ 39,000.00$ 100.00$ 600.00$ 400.00$ 2,400.00$ Bid Bid Total 3,782,663.00$ 4,029,025.00$ 4,187,218.00$ % of DBE
Surety
License
Sub Contractor
Graham
Contractors
Crack Sealing,
Slurry Seal
Graham
Contractors
Crack Sealing &
Slurry Seal
Mike O'Dell
Survey Survey
Blackwell General
Engineering Inc
Mobilization,
Exploration, Hole
Jalos Construction
Inc Concrete Tulby Consulting
Group SWPP
Chrisp Company
Traffic
Control,Mobilization,
Striping
A1 Trucking SVS,
Inc. Trucking Chrisp Company Stripe & Sign
Lone Star
Landscape Inc
Planting, Lanscape,
Maintenace, New
Irrigation
Columbia Electric
Inc Electrical Graham
Contractors, Inc. Slurry Seal
Columbia Electric
Inc.

Mobilization, Removal
of Streetlight, New
Lighting System
Marina Landscape Landscape,
Irrigation
Columbia Electric,
Inc. Electrical
Chrisp Company Striping Lonestar
Landscape,Inc. Landscape
Golden Bay
Construction Underground
Note:

28.80% Good Faith Effort 27.16%
A, Haz
10% Bid Bond
A, HAZ
10% Bid Bond
A, B, C8, C12, C27
* Bid submitted by Sposeto Engineering, Inc., contains math error in the bid total. The accurate bid amount is shown. 10% Bid Bond
Attachment 1