Project Financial Summary
Project Costs Revenues Operating Costs
Prior Actual 48,558 - -
2023-24 4,575,437 - -
2024-25 2,000,000 -
2025-26 2,000,000 - -
2026-27 - - -
2027-28 - - -
2028-29 - - -
2029-30 - - -
2030-31 - - -
2031-32 - - -
2032-33 - - -
2033-34 - - -
2034-35 - - -
2035-36 - - -
2036-37 - - -
2037-38 - - -
2038-39 - - -
2039-40 - - -
2040-41 - - -
2041-42 - - -
2042-43 - - -
2043-44 - - -
20 Year Total 4,000,000 - -
Grand Total 8,623,994 - -
Project Description/Scope/Purpose
The Department of Public Safety (DPS) uses critical software for Computer Aided Dispatch (CAD) and Mobile Computing (Mobile). CAD supports comprehensive dispatching and incident control for law enforcement, fire, and emergency medical services. The current system is reaching end-of-life and will need to soon be replaced with a modernized system that will meet DPS' needs to deliver critical services to the residents of Sunnyvale. The City anticipates this project will occur in two distinct phases.

During the first phase of the project, the selected vendor will utilize a test/temporary instance of the CAD solution to conduct a comprehensive identification and review of all processes affected as described in the requirements matrix. The outcome of this effort will be to determine critical business processes impacted in the and support product configuration and business process engineering; Findings will be documented in a Requirements Traceability Matrix (RTM) along with documentation to identify where the City would be better served by changing its processes to fit “industry best practices” or “product capabilities." The second phase will encompass implementation of the selected solution refined by the findings of Phase 1.

Project Evaluation and Analysis
The system replacement is evaluated through a formal Purchasing process. The Department of Public Safety identified requirements. Purchasing published a Request for Proposal and vendors responded with their ability to address the requirements. Assessment of proposals and site visits were conducted to evaluate vendors. The top vendor will be consigned to create a model of the system which must demonstrate that requirements are met before a final contract is entered.

The primary objective of the system is to provide the ability for the dispatchers to accept, track and monitor emergency calls and dispatch public safety personnel to respond to citizen and businesses requests for assistance. As part of the City of Sunnyvale Department of Public Safety disaster recovery and business continuity plan, the proposed CAD system must also reside in an alternate PSAP (Public Safety Answering Point). A PSAP is a call center where emergency calls for police, fire, and ambulance are responded to by Dispatchers. An alternate PSAP is identical to that of the primary PSAP except that it is physically at a different location. The CAD system in the alternate PSAP will only be used when the primary PSAP is unusable. Nevertheless, the alternate PSAP must always be operationally ready. This means that all updates to the CAD system in the primary PSAP must be made to the CAD system located at the alternate PSAP in real time. It is critical that all requirements for this new system are met, because this is a system that cannot fail.

Fiscal Impact
This project is primarily funded by the General Services/Information Technology Sub-Fund, through internal service charges to the Department of Public Safety, which is funded in the General Fund.

Funding Sources
General Services - Technology and Communication Fund
Plans and Goals
SN - Safety and Noise - SN-2: Effective Disaster Preparedness SN - Safety and Noise - SN-3: Safe and Secure City
SN - Safety and Noise - SN-5: Effective Fire Service Response System SN - Safety and Noise - SN-7: Effective Emergency Communication Services SN - Safety and Noise - SN-6: Effective Emergency Response Capability 835610 - Computer Aided Dispatch (CAD) System Replacement Originating Year: 2021 Project Type: Public Safety Department: 290 - Information Technology Planned Completion Year: 2024/25 Category: Special Project Manager: Kathleen Boutte Foster-Gee Attachment 4