Water Pollution Control Plant
Ponds and Levees Study Session
Environmental Services Department
August 27, 2024

DRAFT PRESENTATION
2WPCP Levees and Ponds Study
Pond Levees
Algae Issues
Ponds Future
Levees Recreational Access Study Issue
Agenda

DRAFT PRESENTATION
3WPCP Levees and Ponds Study
Ponds Levees
Oxidation
Pond 2
300 Acres
Oxidation
Pond 1
100 Acres
WPCP
Inner Levee
Outer Levee
Water Pollution Control Plant
(WPCP)
Pond A4
(Valley Water)

DRAFT PRESENTATION
4WPCP Levees and Ponds Study
Timeline
2014 2016 2018 2020 2022 2024
Levee Condition
Assessment
Shoreline Project Ph III
Feasibility Study Kickoff
(US ACE & Valley Water)
Levee
Maintenance Plan
Master Plan Update
Ponds Future Use
2021 20232014
Clean Water Program
Master Plan Algae Issues
Levee Emergency
Repairs

DRAFT PRESENTATION
5WPCP Levees and Ponds Study
 Levee Condition Assessment (2016) and
Operations and Maintenance Manual (2018)
 Riprap Placement, ~13,000 ft
 Vegetation Removal, ~19,000 ft
 Levee Road Improvements, ~9,000 ft
Pond Levees - Levee Condition Assessment

DRAFT PRESENTATION
6WPCP Levees and Ponds Study
 Ongoing Mechanical Vegetation Removal
 Annual Cost is ~$420,000
Pond Levees - Levee Vegetation Management

DRAFT PRESENTATION
7WPCP Levees and Ponds Study
 WPCP Oxidation Pond Levee Rehabilitation Project - $15M Pond 1 East Levee Project – 3, 600 ft, $2M, north section complete in 2023, south section in design.
Pond 2 South Levee – 5 ,000 ft future project
Pond 2 West/Pond 1 North Levee Emergency Repairs - $0.5M , April 2024.

Pond Levees - Levee Road Improvements

DRAFT PRESENTATION
8WPCP Levees and Ponds Study
 Pond 2 Levee Seepage Spot Repair
 Pond 2 North Levee Spot Repairs
Pond Levees – Emergency Spot Repairs
May 2022
Jul 2023
Nov 2023

DRAFT PRESENTATION
9WPCP Levees and Ponds Study
Single-cell blue-green algae
(<2 um, picoplankton)
Algae Issues
WPCP
Algae
Issues
Permit
Compliance
Challenges
Chemical
Management
Recycled
Water
Production

DRAFT PRESENTATION
10WPCP Levees and Ponds Study
 Lake Guard Oxy® Al gae Treatment (2022)
 Water IQ Ultrasonic Algae Treatment (2023)
 Biological Solids Reduction (2023)
Algae Issues - Pilot Studies

DRAFT PRESENTATION
11WPCP Levees and Ponds Study
 Modified Air Flotation Tanks (AFT) for In-series Treatment in Summer 2023 Portion of Effluent sent to Tank #3
Additional Chemistry in Tank #3
 Successfully Improved Turbidity and Total Suspended Solids Removal 10 NTU – D ischarge Permit Requirement
×Could not Meet Recycled Water Requirement
 Currently Used As Needed
WPCP
Algae Issues - Plant Modifications

DRAFT PRESENTATION
12WPCP Levees and Ponds Study
 Algae Management
Targeted Algaecide Study
 Ponds Operational Modifications
Evaluate Isolating Pond 1 Return
C
hannel from Recirculation Pump Station
Evaluate directing AFT float to Pond 1
Algae Issues - Future Actions

DRAFT PRESENTATION
13WPCP Levees and Ponds Study
Recycled Water Production Pilot
 Cloth Media Filtration
Pilot Testing of a Cloth Media Filter
Implementation Plan for Full Scale Package Plant
0 1
2 3
4 5
6 7
8 9
10 8/6/24 8/8/24 8/10/24 8/12/24 8/14/24 8/16/24 8/18/24 8/20/24 Turbidity (NTU)
Date
AquaDisk® Cloth Media Filter Pilot Study for Recycled Water Production Pilot Influent Pilot Effluent
CA Title 22 Limit for Recycled Water

DRAFT PRESENTATION
14WPCP Levees and Ponds Study
• Ponds expected to be
r
etired in 2040
• Emergency Storage and
E
qualization in Pond 1
• Valley Water Pond A4
c
onsidered as alternative
• Master Plan Update will
r
evisit A4
 Closer to Main Plant
 Challenging location because
it is “Water of the US”
Ponds Future - Plant Master Plan
Storage

DRAFT PRESENTATION
15WPCP Levees and Ponds Study
2023 Feb 2024 2027 2030
Study kick-off Public Scoping
Meeting
Draft Report of
potential solutions
for public review
and comment
Final report sent to
Congress for approval
and funding for design
and construction
Ponds Future – Valley Water Partnership
 Sunnyvale is in Phase III of the Shoreline Project Feasibility Study  Alternatives Analysis by USACE in progress
 Cost/Benefit used to determine “Federal Interest”
S
tudy Timeline:
(Subject to change)

DRAFT PRESENTATION
16WPCP Levees and Ponds Study
Shoreline Alternatives in Development
 Retirement of Ponds changes
s
horeline options
 Restoration  o pportunity
and challenge
 Interagency roles – may need
agreement
Example
Concepts

DRAFT PRESENTATION
17WPCP Levees and Ponds Study
• Led by LRS; ESD is partner
• Operational, recreational, and
e
nvironmental considerations
• Public engagement as part of
s
tudy
• Time to complete – 1-2 years
Study Issue LRS 24-01
Study Issue: Access Closure to Interior Levees

DRAFT PRESENTATION
18WPCP Levees and Ponds Study
• Ongoing Levee Maintenance and improvements needed until p
onds are retired in 2040
• Algae management will be an acute issue until Conventional A
ctivated Sludge-1 project is completed (2028)
• Chemical Management continues to be challenging
• RW Production option for Council consideration (early 2025) • Ponds restoration – an opportunity and a challenge
• Separate sea level protection plan outside of Shoreline Study m
ay be needed for Emergency storage and equalization area Summary

DRAFT PRESENTATION
19WPCP Levees and Ponds Study
Questions/Discussion

DRAFT PRESENTATION