01/07/2025 Bid Summary
IFB PW25-05 Replacement/Repair/Rehabilitation of Sanitary Sewer System (UY-21-01)
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Recommend Not to Exceed 5% of Total Base Bid) 1 LS 106,374.00$ 106,374.00$ 95,000.00$ 95,000.00$ 100,000.00$ 100,000.00$ 50,000.00$ 50,000.00$ 110,000.00$ 110,000.00$ 160,000.00$ 160,000.00$ 100,000.00$ 100,000.00$ 150,000.00$ 150,000.00$ 130,000.00$ 130,000.00$ 20,000.00$ 20,000.00$ 250,000.00$ 250,000.00$ 2 Traffic Control 1 LS 104,120.00$ 104,120.00$ 26,000.00$ 26,000.00$ 75,000.00$ 75,000.00$ 45,000.00$ 45,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 20,000.00$ 20,000.00$ 50,000.00$ 50,000.00$ 80,000.00$ 80,000.00$ 39,265.75$ 39,265.75$ 16,000.00$ 16,000.00$ 3 Erosion Control 1 LS 1,000.00$ 1,000.00$ 8,000.00$ 8,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 15,000.00$ 5,000.00$ 5,000.00$ 20,000.00$ 20,000.00$ 25,000.00$ 25,000.00$ 1,000.00$ 1,000.00$ 5,000.00$ 5,000.00$ 4 Handling of Sewage Flows/Sewage Bypassing 1 LS 5,000.00$ 5,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 50,000.00$ 50,000.00$ 10,279.33$ 10,279.33$ 20,000.00$ 20,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 1,000.00$ 1,000.00$ 17,000.00$ 17,000.00$ 5 OSHA Requirements -Shoring, Confined Space, Etc. 1 LS 9,000.00$ 9,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 60,000.00$ 60,000.00$ 50,000.00$ 50,000.00$ 78,000.00$ 78,000.00$ 100,000.00$ 100,000.00$ 20,000.00$ 20,000.00$ 80,000.00$ 80,000.00$ 1,000.00$ 1,000.00$ 35,000.00$ 35,000.00$ 6 Construct 8" Sewer by Open Cut 8,165 LF 168.00$ 1,371,720.00$ 210.00$ 1,714,650.00$ 220.00$ 1,796,300.00$ 255.00$ 2,082,075.00$ 250.00$ 2,041,250.00$ 280.00$ 2,286,200.00$ 310.00$ 2,531,150.00$ 300.00$ 2,449,500.00$ 340.00$ 2,776,100.00$ 396.52$ 3,237,585.80$ 470.00$ 3,837,550.00$ 7 Construct 8" Sewer by Pipe Bursting or Open Cut 956 LF 168.00$ 160,608.00$ 128.00$ 122,368.00$ 210.00$ 200,760.00$ 180.00$ 172,080.00$ 250.00$ 239,000.00$ 200.00$ 191,200.00$ 280.00$ 267,680.00$ 160.00$ 152,960.00$ 260.00$ 248,560.00$ 396.52$ 379,073.12$ 220.00$ 210,320.00$ 8 Repair 6" Sewer by CIPP Method – Site 17 879 LF 121.00$ 106,359.00$ 110.00$ 96,690.00$ 130.00$ 114,270.00$ 105.00$ 92,295.00$ 90.00$ 79,110.00$ 105.00$ 92,295.00$ 100.00$ 87,900.00$ 110.00$ 96,690.00$ 160.00$ 140,640.00$ 105.00$ 92,295.00$ 136.50$ 119,983.50$ 9 Construct 6" Sewer by Open Cut – Site 17 23 LF 494.00$ 11,362.00$ 400.00$ 9,200.00$ 500.00$ 11,500.00$ 250.00$ 5,750.00$ 400.00$ 9,200.00$ 400.00$ 9,200.00$ 1,000.00$ 23,000.00$ 500.00$ 11,500.00$ 400.00$ 9,200.00$ 385.00$ 8,855.00$ 650.00$ 14,950.00$ #
# Replace Manhole Frame, Cover, and Grade Rings 37 EA 1,947.00$ 72,039.00$ 2,000.00$ 74,000.00$ 2,100.00$ 77,700.00$ 1,500.00$ 55,500.00$ 1,000.00$ 37,000.00$ 1,500.00$ 55,500.00$ 1,200.00$ 44,400.00$ 1,500.00$ 55,500.00$ 2,500.00$ 92,500.00$ 1,621.61$ 59,999.57$ 1,850.00$ 68,450.00$ #
# Rechannel Existing Manhole Base 34 EA 1,200.00$ 40,800.00$ 1,500.00$ 51,000.00$ 1,200.00$ 40,800.00$ 600.00$ 20,400.00$ 1,500.00$ 51,000.00$ 500.00$ 17,000.00$ 1,100.00$ 37,400.00$ 2,000.00$ 68,000.00$ 2,000.00$ 68,000.00$ 1,200.00$ 40,800.00$ 1,850.00$ 62,900.00$ #
# Line Existing Manhole Interior per Modified STD 1A 43 EA 4,389.00$ 188,727.00$ 4,350.00$ 187,050.00$ 4,000.00$ 172,000.00$ 3,902.00$ 167,786.00$ 4,200.00$ 180,600.00$ 3,800.00$ 163,400.00$ 2,000.00$ 86,000.00$ 4,000.00$ 172,000.00$ 4,000.00$ 172,000.00$ 4,186.04$ 179,999.72$ 4,950.00$ 212,850.00$ #
# Reconnect Sewer Lateral – Open Cut 248 EA 322.00$ 79,856.00$ 375.00$ 93,000.00$ 280.00$ 69,440.00$ 500.00$ 124,000.00$ 100.00$ 24,800.00$ 100.00$ 24,800.00$ 1,000.00$ 248,000.00$ 1,000.00$ 248,000.00$ 250.00$ 62,000.00$ 300.00$ 74,400.00$ 350.00$ 86,800.00$ #
#
#
Reconnect Sewer Lateral – Pipe Bursting or Open Cut 34 EA 322.00$ 10,948.00$ 375.00$ 12,750.00$ 850.00$ 28,900.00$ 400.00$ 13,600.00$ 100.00$ 3,400.00$ 100.00$ 3,400.00$ 1,000.00$ 34,000.00$ 1,500.00$ 51,000.00$ 160.00$ 5,440.00$ 300.00$ 10,200.00$ 450.00$ 15,300.00$ #
# Install Slurry Seal Type II with 2.5% Latex 312,261 SF 0.54$ 168,620.94$ 0.60$ 187,356.60$ 0.48$ 149,885.28$ 0.47$ 146,762.67$ 0.50$ 156,130.50$ 0.47$ 146,762.67$ 0.42$ 131,149.62$ 0.50$ 156,130.50$ 0.50$ 156,130.50$ 0.47$ 146,762.67$ 0.55$ 171,743.55$ #
#
#
Pre-Installation Cleaning and Video Inspection of Sewer 10,321 LF 2.20$ 22,706.20$ 2.00$ 20,642.00$ 1.72$ 17,752.12$ 3.00$ 30,963.00$ 2.50$ 25,802.50$ 2.00$ 20,642.00$ 1.00$ 10,321.00$ 4.00$ 41,284.00$ 5.00$ 51,605.00$ 3.76$ 38,806.96$ 1.85$ 19,093.85$ #
#
#
Post-Installation Video Inspection of Completed Sewer 10,321 LF 1.15$ 11,869.15$ 2.00$ 20,642.00$ 1.35$ 13,933.35$ 3.00$ 30,963.00$ 3.00$ 30,963.00$ 1.00$ 10,321.00$ 1.00$ 10,321.00$ 4.00$ 41,284.00$ 5.00$ 51,605.00$ 2.71$ 27,969.91$ 1.85$ 19,093.85$ #
#
#
Install Video Traffic Detection Camera System – Site 8 1 LS 90,150.00$ 90,150.00$ 125,000.00$ 125,000.00$ 63,800.00$ 63,800.00$ 66,725.00$ 66,725.00$ 100,000.00$ 100,000.00$ 84,000.00$ 84,000.00$ 67,000.00$ 67,000.00$ 50,000.00$ 50,000.00$ 66,725.00$ 66,725.00$ 175,000.00$ 175,000.00$ 73,000.00$ 73,000.00$ Bid Bid Total 2,561,259.29$ 2,898,348.60$ 2,987,040.75$ 3,188,899.67$ 3,253,256.00$ 3,418,000.00$ 3,823,321.62$ 3,863,848.50$ 4,235,505.50$ 4,534,013.50$ 5,235,034.75$ Surety
License
Sub Contractor
Presidio System,
Inc CCTV
Christian
Brothers Lining
Co
6" CIPP
Christian
Brothers Lining
Co
lining Chrisp
Company
Striping/Pavement
Marking
Chrisp
Company Striping Graham
Contractors, Inc Slurry Seal Bond Blacktop,
Inc Slurry Seal Chrisp
Company Striping Graham
Contractor Slurry Seal
Christian
Brothers Lining
Co
CIPP Lining Bond Blacktop
Inc Slurry Seal
Christian
Brothers Lining
Co
CIPP Liner H&R
Underground MH Rehabilitation
H&R Plumbing
and Drain
Cleaning Inc
MH Rehabilitation CBL Lining CIPP Liing Graham
Contractors, Inc Slurry Seal
Christian
Brothers Lining
Co
Cured in Place
CIPP
Chrisp
Company Striping CB Lining CIPP H&R Plumbing MH Rehab Bear Electrical Solutions, Inc
Installation of
Video Traffic
Detection Camera
Presidio System
Inc CCTV
H&R Plumbing
and Drain
Cleaning Inc
Coating Graham
Contractors Type II Slurry Seal Tennyson
Electric LLC
install Video
Traffic Detection
Camera System
H&R Plumbing
and Drain
Cleaning Inc
Mahole Rehab H&R
Underground Manhole Rehab
H&R Plumbing
and Drain
Cleaning Inc
Line Existing
Manholes
Nor-Cal Pipeline
Services CIPP H&R Plumbing MH Rehab Tennyson
Electric LLC Electrical Work
Sanchez
Landscape
Service
Trucking Services CB Lining Co CIPP
Graham
Contractors Inc Slurry Seal Bear Electrical
Solutions
Video Traffic
Detection Camera
System
Tennyson
Electric LLC
install Video
Traffic Detection
Camera System
Nor-Cal Pipeline
Services CIPP Tennyson
Electric LLC
Video Traffic
Detection Camera
System
Tennyson
Electric, LLC
Video Traffic
Detection Liffey Electric Electrical Sierra Traffic
Markings, Inc Striping SBV Concrete
Inc
concrete repairs
and labor
H&R Plumbing
and Drain
Cleaning, Inc.
MH Rehab
Chrisp
Company Striping Bear Electrical
Solutions
Traffic Camera
System/Loops
Graham
Contractor Slurry Seal Nor-Cal Pipeline
Services CIPP H&R Plumbing
and Rooter manhole lining JLB Sawvutting
Inc Sawcutting
Ray's Electric Electrical Cell-Crete
Corporation
Pipe
Abandonment
Graham
Contractors slurry seal coating Tennyson
Electric LLC
Video Traffic
Detection Camera
System
Tri-Valley
Striping
Asphalt striping
services
Glen Gilbert Bypass pumping,
vacuum truck
Corcus Construction Incorporated
1592 Union St, #476,
San Francisco, CA 94123
Thomas Breen
10% Bid Bond
A
Able Underground Construction
Incorporated
1020 Ruff Drive
San Jose, CA 95110
Glen Gilbert
10% Bid Bond
AA, B A, B, C-4, C-31, HAZ A A, C34
Kieran Woods Thomas Grover Derek Devaney Michael Kirwan 10% Bid Bond 10% Bid Bond 10% Bid Bond 10% Bid Bond
KJ Woods Construction Ranger Pipelines Devaney Engineering Inc Cratus Inc.
PO Box 947
South San Francisco, CA 94083
1790 Yosemite Ave
San Francisco, CA 94124
2655 Van Ness Ave., Ste 3
San Francisco, CA 94109
945 Taraval Street #302
San Francisco, CA 94116
10% Bid Bond 10% Bid Bond
A A
Bay Pacific Pipelines Inc, Sub Terra Construction Inc
PO Box 1162
Novato, CA 94948
1485 Bay Shore Blvd, MB240,
STE440
San Francisco, CA 94124
Kevin Carew Kevin Fitzpatrick
A, B, & Haz
C2R Engineering Inc.
100 Mountain View Ave
Los Altos, CA 94024
Trevor Connolly
A
10% Bid Bond
APB General Engineering
2721 Kevin Rd
San Pablo, CA 94806
Alfred Lee
A
10% Bid Bond
Casey Construction Inc.
619 Sylvan Way
Emerald Hills, CA 94062
Brenden J Casey
10% Bid Bond
Attachment 1