3/20/25 Bid Summary
IFB PW25-07 PLAYGROUND EQUIPMENT
REPLACEMENT 2024 PR-24-01
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Project Start up 1 LS 12,240.00$ 12,240.00$ 40,000.00$ 40,000.00$ 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 2 Erosion Control 1 LS 9,788.00$ 9,788.00$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 3 Demolition 1 LS 36,191.00$ 36,191.00$ 35,000.00$ 35,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 4 Rough Grading 1 LS 16,752.00$ 16,752.00$ 30,000.00$ 30,000.00$ 12,000.00$ 12,000.00$ 10,000.00$ 10,000.00$ 5 Soil Off-Haul 1 LS 12,911.00$ 12,911.00$ 15,000.00$ 15,000.00$ 2,000.00$ 2,000.00$ 7,500.00$ 7,500.00$ 6 Catch Basin 1 EA 5,461.00$ 5,461.00$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$ 4,000.00$ 4,000.00$ 7 Junction Box 1 EA 5,311.00$ 5,311.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 4,000.00$ 4,000.00$ 8 Solid Drain line, 4" 65 LF 101.00$ 6,565.00$ 100.00$ 6,500.00$ 150.00$ 9,750.00$ 65.00$ 4,225.00$ 9 Storm Drain Point of Connection 1 EA 4,831.00$ 4,831.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 3,000.00$ 3,000.00$ 10 Play Equipment 1 LS 117,723.00$ 117,723.00$ 100,000.00$ 100,000.00$ 170,000.00$ 170,000.00$ 180,000.00$ 180,000.00$ 11 Resilient Rubber Surfacing 345 SF 39.00$ 13,455.00$ 80.00$ 27,600.00$ 64.00$ 22,080.00$ 90.00$ 31,050.00$ 12 Engineered Wood Fiber Surfacing 1,085 SF 6.00$ 6,510.00$ 4.00$ 4,340.00$ 5.00$ 5,425.00$ 15.00$ 16,275.00$ 13 Concrete Pavement 1 SF 19,280.00$ 19,280.00$ 60,000.00$ 60,000.00$ 20,000.00$ 20,000.00$ 19,000.00$ 19,000.00$ 14 Concrete Wall ALLOW LS 4,080.00$ 4,080.00$ 10,000.00$ 10,000.00$ 3,800.00$ 3,800.00$ 2,000.00$ 2,000.00$ 15 Mulch 510 SF 8.00$ 4,080.00$ 5.00$ 2,550.00$ 2.00$ 1,020.00$ 3.00$ 1,530.00$ 16 Turf from Sod 1,235 SF 6.00$ 7,410.00$ 5.00$ 6,175.00$ 3.00$ 3,705.00$ 4.00$ 4,940.00$ 17 Plant Establishment 1 MO 4,674.00$ 4,674.00$ 10,000.00$ 10,000.00$ 1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 18 Irrigation System Modifications 1 LS 8,074.00$ 8,074.00$ 15,000.00$ 15,000.00$ 12,000.00$ 12,000.00$ 1,000.00$ 1,000.00$ -$ -$ -$ -$
19 Project Start-Up 1 LS 16,148.00$ 16,148.00$ 40,000.00$ 40,000.00$ 20,000.00$ 20,000.00$ 25,000.00$ 25,000.00$ 20 Erosion Control 1 LS 10,090.00$ 10,090.00$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 21 Demolition 1 LS 41,091.00$ 41,091.00$ 30,000.00$ 30,000.00$ 40,000.00$ 40,000.00$ 35,000.00$ 35,000.00$ 22 Rough Grading 1 LS 25,333.00$ 25,333.00$ 25,000.00$ 25,000.00$ 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 23 Soil Off-Haul 1 LS 15,712.00$ 15,712.00$ 25,000.00$ 25,000.00$ 5,000.00$ 5,000.00$ 10,000.00$ 10,000.00$ 24 Catch Basin 2 EA 3,615.00$ 7,230.00$ 1,000.00$ 2,000.00$ 2,200.00$ 4,400.00$ 2,000.00$ 4,000.00$ 25 Solid Drain line, 8" 75 LF 100.00$ 7,500.00$ 120.00$ 9,000.00$ 200.00$ 15,000.00$ 140.00$ 10,500.00$ 26 Storm Drain Point of Connection 2 EA 2,895.00$ 5,790.00$ 750.00$ 1,500.00$ 500.00$ 1,000.00$ 3,000.00$ 6,000.00$ 27 Play Equipment 1 LS 248,524.00$ 248,524.00$ 200,000.00$ 200,000.00$ 350,000.00$ 350,000.00$ 315,000.00$ 315,000.00$ 28 Resilient Rubber Surfacing 1,605 SF 49.00$ 78,645.00$ 70.00$ 112,350.00$ 65.00$ 104,325.00$ 65.00$ 104,325.00$ 29 Engineered Wood Fiber Surfacing 1,195 SF 6.00$ 7,170.00$ 5.00$ 5,975.00$ 5.00$ 5,975.00$ 10.00$ 11,950.00$ 30 Asphalt Pavement, Pedestrian 1,595 SF 6.00$ 9,570.00$ 10.00$ 15,950.00$ 13.00$ 20,735.00$ 12.00$ 19,140.00$ 31 Asphalt Pavement, Conform 35 SF 122.00$ 4,270.00$ 20.00$ 700.00$ 12.00$ 420.00$ 100.00$ 3,500.00$ 32 Concrete Pavement 255 SF 32.00$ 8,160.00$ 50.00$ 12,750.00$ 20.00$ 5,100.00$ 30.00$ 7,650.00$ 33 Accessible Ramp 1 LS 7,394.00$ 7,394.00$ 10,000.00$ 10,000.00$ 8,000.00$ 8,000.00$ 3,000.00$ 3,000.00$ 34 Accessible Parking Sign 2 EA 2,126.00$ 4,252.00$ 500.00$ 1,000.00$ 700.00$ 1,400.00$ 1,300.00$ 2,600.00$ 35 Turf from Sod 160 SF 24.00$ 3,840.00$ 5.00$ 800.00$ 5.00$ 800.00$ 20.00$ 3,200.00$ 36 Plant Establishment 1 MO 3,674.00$ 3,674.00$ 10,000.00$ 10,000.00$ 500.00$ 500.00$ 2,000.00$ 2,000.00$ 37 Parking Stall Restriping 1 LS 4,251.00$ 4,251.00$ 10,000.00$ 10,000.00$ 3,500.00$ 3,500.00$ 5,000.00$ 5,000.00$ Redwood Engineering
31551 Avenida Los Cerritos
San Juan Capistrano, CA 92675
Benedict Cerney
Guerra Construction Group
984 Memorex Drive
Santa Clara, CA 95050
Jaime Guerra
S&H Construction Inc QLM-Inc
5560 Boscell Common
Fremont, CA 94538
Harmeet Anand
94 Umbarger Road
San Jose, CA 95111
Darrell Qualls
Cannery Park
Columbia Park
Attachment 1

Page 1 of 2 ends

3/20/25 Bid Summary
IFB PW25-07 PLAYGROUND EQUIPMENT
REPLACEMENT 2024 PR-24-01
Item Description QTY UNIT Unit Price Total Unit Price Total Unit Price Total Unit Price Total Benedict CerneyJaime Guerra Harmeet Anand Darrell Qualls 38 Reinstall Gas Valve Box 1 LS 4,002.00$ 4,002.00$ 2,410.00$ 2,410.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 807,982.00$ 898,600.00$ 934,435.00$ 939,385.00$ Surety
License
Subcontractor(s)
Playgrounds UnlimitedPlay Equipment Install Playground
Unlimited
Play Equipment
Installation Rubber
Protecting Surfacing
Installation
Playground
Unlimited
Playground
Installation, Play
Surface Installatin
James Breneman DBA JB Infrastructor
Omstallation of
Playground
Equipment
10% Bid Bond
A
10% Bid Bond
A, B,
Total Base Bid
10% Bid Bond 10% Bid Bond
A, B, C9, C10, C20, C36 A, B