DRAFT 5/15/25_________
T-DPW-190043
Council Agenda:6/3/2025
Item No: 1
RESOLUTION NO._______
RESOLUTION ADOPTING PROJECT LISTING FOR
FISCAL YEAR 2025/26 FUNDED BY SENATE BILL 1, THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, California State Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the California Legislature and signed into law by the Governor of California in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Sunnyvale are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS, the City of Sunnyvale must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Sunnyvale will receive an estimated $4.1 million in RMRA funding in fiscal year 2025/26 pursuant to SB 1; and
WHEREAS, this is the ninth year in which the City of Sunnyvale is receiving SB 1 funding which will enable the City of Sunnyvale to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City of Sunnyvale has undergone a robust public process to ensure public input into the community’s transportation priorities/the project list; and WHEREAS, the City of Sunnyvale used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City of Sunnyvale maintain and rehabilitate 340 streets/roads segments and active transportation infrastructure throughout the City Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 2
of Sunnyvale this fiscal year and 300 similar projects into the future, and the City of Sunnyvale uses SB 1 funds for its Pavement Rehabilitation Program, which includes slurry seal, crack seal, and pavement rehabilitation projects; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City of Sunnyvale’s streets and roads are in a “good” condition and this revenue will help the City increase the overall quality of the City’s road system and over the next decade will bring the City’s streets and roads into a “very good” condition; and WHEREAS, the SB 1 project list and overall investment in the City’s local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. Maintaining Sunnyvale streets in very good condition is essential to maintaining the economic vitality for the City and enhancing the quality of life for the City’s residents.
NOW, THEREFORE IT IS HEREBY RESOLVED, BY THE CITY COUNCIL OF THE CITY OF SUNNYVALE THAT:
1. The City Council herby finds that the facts set forth in the recitals to this Resolution are true and correct, and establish the factual basis for the City Council’s adoption of this Resolution.
2. The City Council hereby adopts the Resolution approving the Project Listing for fiscal year 2025/26 pursuant to the Road Repair and Accountability Act of 2017.
3. The City Council herby approves the following list of newly proposed projects which will be funded in-part or solely with fiscal year 2025/26 Road Maintenance and Rehabilitation Account revenues:
[Project Tables Start on Next Page]
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 3
Project title: Pavement Rehabilitation 2026 – SB1, ST-25-14 Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below
Estimated Project Schedule: June 2026 – October 2027
Estimated Project Useful Life: 10 to 20 years
*Purple streets may not get paved.
Project title: Slurry Seal 2026 B-SB1, ST-25-17
Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: June 2026 – September 2026
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End
Location
Area (SF) Treatment
Washington Mary (e/s) Sunset (ctr) 41,623 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Washington Sunset (ctr) Pastoria (ctr) 59,815 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Street Name Beginning
Location
End Location Area (SF) Treatment
Duane Fair Oaks San Juan 60,237 AC Mill & Fill
Duane San Juan DeGuigne 136,150 AC Mill & Fill
Dunford Quail Teal 30,710 AC Mill & Fill
Oak Creek Manzano Sandia 45,831 AC Mill & Fill
Acalanes Ayala Washington 46,542 AC Mill & Fill
Wildwood Bridgewood Fairwood 16,660 AC Mill & Fill
Wildwood Fairwood C.O.P. (120 ft east
of Flamewood)
21,000 AC Mill & Fill
Torrance Fairwood Havenwood 30,114 AC Mill & Fill
Torrance Havenwood Wildwood 40,764 AC Mill & Fill
Navarro Bryant Elizabeth 30,647 AC Mill & Fill
*Lorne Swallow East end 18,849 AC Mill & Fill
*Dawn Spinosa Sunnymount 55,776 AC Mill & Fill or
Slurry
*Sunnymount Dawn Spinosa 55,619 AC Mill & Fill or
Slurry
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 4
Washington Pastoria (ctr) Mathilda
(w/s)
42,236 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Washington Bernardo
(e/s)
Corral (w/s)
17,988
Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Washington Corral (w/s) Lanitos (w/s)
10,019
Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Washington Pastoria (ctr) Leota (ctr)
10,619
Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Washington Leota (ctr) Mary (w/s) 40,637 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Evelyn Sunnyvale
(e/s)
Bayview
(ctr)
41,913 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Evelyn Bayview
(ctr)
Fair Oaks
(w/s)
109,649 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Evelyn Fair Oaks
(w/s)
Wolfe (w/s) 143,545 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Fair Oaks Arques (s/s) California
(ctr)
46,337 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Fair Oaks California
(ctr)
Kifer (ctr) 63,941 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Mathilda El Camino
Real (s/s)
Danforth
(ctr)
88,200 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Mathilda Danforth
(ctr)
Talisman
(ctr)
110,376 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Sunnyvale Talisman
(ctr)
Remington
(ctr)
109,200 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Sunnyvale Remington
(ctr)
Fremont (ctr) 194,922 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 5
Sunnyvale Fremont (ctr) Connemara
(ctr)
155,532 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Sunnyvale Connemara
(ctr)
Alberta (ctr) 103,272 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Sunnyvale Alberta (ctr) City Limits
at Homestead
132,678 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
TOTAL
AREA (SF):
1,522,502
Project title: Homestead Rd Slurry Seal B, ST-25-08
Project Description: Slurry Seal
Project Location: See attached
Estimated Project Schedule: June 2026 – September 2026
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End
Location
Area (SF) Treatment
Homestead Belleville
(ctr)
w/s Hwy 85
(start of
PCC)
27,984 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Homestead 138 ft w/o
Bernardo
Bernardo
(ctr)
8,832 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Homestead Bernardo (ctr) Wright (e/s) 55,232 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Homestead
Hollenbeck
(ctr)
Franco Ct
(w/s)
84,800 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Homestead 175
Homestead
(w/pl)
Blue Jay (ctr) 25,868 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
Homestead Blue Jay (ctr) Blaney (ctr) 99,308 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 6
Homestead Blaney (ctr) Heron (ctr) 86,925 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Homestead Heron (ctr) Linnet (w/s) 34,474 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Homestead Linnet (e/s) Wolfe (ctr) 18,180 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Homestead Wolfe (ctr) Quail (ctr) 156,648 Asphalt Repairs, Crack Seal, Slurry Seal, Traffic
Striping
Homestead Quail (ctr) 300 feet w/o
Lawrence
Expressway
130,393 Asphalt Repairs, Crack
Seal, Slurry Seal, Traffic
Striping
TOTAL
AREA (SF):
728,644
4. The following previously proposed and adopted projects may also utilize fiscal year 2025/26 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Sunnyvale is reaffirming to the public and the State the City’s intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Each Relisted Project Previously Proposed MUST Include:
Project Title: Pavement Rehabilitation 2025, ST-24-08
Project Description: Pavement Rehabilitation and Resurfacing Project Location: Maude (Mathilda to Fair Oaks) and Lakehaven (Silverlake to Lawrence Expressway)
Estimated Project Schedule: May 2024 – November 2025
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End Location Area (SF) Treatment
Maude Ave. Mathilda (e/s) Sunnyvale (ctr) 87,522 Mill & Till Maude Ave. Sunnyvale (ctr) Bayview (ctr) 47,659 Mill & Till Maude Ave. Bayview (ctr) Fair Oaks (w/s) 76,416 Mill & Till Lakehaven Dr. Silverlake (ctr) 1017 (w/pl) 14,378 Mill & Till Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 7
Lakehaven Dr. 1017 Lakehaven
Dr. (w/pl)
Lawrence
Expressway
32,988 Mill & Till
TOTAL AREA
(SF): 258,963
Project Title: Slurry Seal 2025 B – SB1 (Formerly Slurry Seal 2024 B, ST-24-05) Project Description: Patch, Crackseal, and Slurry Seal
Project Location: Mathilda (Ahwanee to El Camino Real), Wolfe (Fair Oaks to Evelyn), Silverlake (Lakehaven to Lakebird), Lakebird (Silverlake to Meadowlake), and Meadowlake (Lakebird to Lakehaven). Segments removed: Silverlake, Lakebird, and Meadowlake
Estimated Project Schedule: January 2024 – July 2025
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End
Location
Area (SF) Treatment
Mathilda Ave. Ahwanee (s/s) San Aleso
(ctr)
75,666 Patch, Crackseal,
Slurry Seal
Mathilda Ave. San Aleso (ctr) Maude (ctr) 145,539 Patch, Crackseal, Slurry Seal
Mathilda Ave. Maude (ctr) Indio (ctr) 144,678 Patch, Crackseal, Slurry Seal
Mathilda Ave. Indio (ctr) California
(ctr)
140,678 Patch, Crackseal,
Slurry Seal
Mathilda Ave. California (ctr) Washington
(ctr)
179,050 Patch, Crackseal,
Slurry Seal
Mathilda Ave. Washington
(ctr)
McKinley
(ctr)
179,050 Patch, Crackseal,
Slurry Seal
Mathilda Ave. McKinley (ctr) Iowa (ctr) 56,530 Patch, Crackseal, Slurry Seal
Mathilda Ave. Iowa (ctr) Olive (ctr) 71,421 Patch, Crackseal, Slurry Seal
Mathilda Ave. Olive (ctr) El Camino
Real (n/s)
84,652 Patch, Crackseal,
Slurry Seal
Wolfe Rd. Fair Oaks (s/s) Stewart (ctr) 133,290 Patch, Crackseal, Slurry Seal
Wolfe Rd. Stewart (ctr) Arques (ctr) 66,917 Patch, Crackseal, Slurry Seal
Wolfe Rd. Arques (ctr) Kifer (ctr) 183,026 Patch, Crackseal, Slurry Seal
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 8
Wolfe Rd. Kifer (ctr) Evelyn (s/s) 144,743 Patch, Crackseal, Slurry Seal
TOTAL
AREA (SF):
1,744,672
Project Title: Pavement Rehabilitation 2023-SB1, ST-21-05 (formerly Pavement Rehabilitation 2022-SB1), Substantially complete, but still ongoing billing.
Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funding (Pavement Rehabilitation and Resurfacing, Patch and Crackseal) Project Location: See tables below
Estimated Project Schedule: March 2021 – October 2025
Street Name Beginning Location End Location Area (SF) Treatment Cascade Drive S. Bernardo Avenue Wright Avenue
(w/s)
49,000 Mill & Fill
Cheyenne Drive Owen Sound Drive
(ctr)
Drain inlet on
Valcartier Drive,
Electric Light Pole
#5C17
52,020 Mill & Fill
Connemara
Way
Sunnyvale Saratoga
Road (e/s)
Bittern Drive (w/s) 41,460 Mill & Fill
Cortez Drive Acalanes Drive
(e/s)
South Bernardo
Avenue (w/s)
36,676 Mill & Fill
Enderby Way Cascade Drive (n/s) North end 5,162 Mill & Fill Gail Avenue Iris Avenue (s/s) Linden Avenue,
Electric Light Pole
#13D03
58,456 Mill & Fill
Lark Lane Linnet Lane Shetland Place 37,257 Mill & Fill Lawrence
Station Road
Kifer Road (s/s) Below center of
overpass
37,125 Mill & Fill
Lochinvar
Avenue
Calabazas Creek
(e/s)
Waxwing Avenue
(ctr)
24,394 Mill & Fill
Lochinvar
Avenue
Waxwing Avenue
(ctr)
Lawrence
Expressway
17,751 Mill & Fill
Old San
Francisco Road
Fair Oaks Avenue
(e/s)
Wolfe Road (w/s) 159,871 Mill & Fill
S. Murphy
Avenue
W. Iowa Avenue
(s/s)
El Camino Real
(n/s), end of island
35,424 Mill & Fill
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 9
Sandia Avenue Wildwood Avenue Havenwood
Avenue
55,068 Mill & Fill
Sheraton Dr Hollenbeck Avenue Spinosa Drive 43,680 Mill & Fill Spinosa Dr
W. Remington
Drive (s/s)
Snowberry Court
(ctr) 28,981 Mill & Fill
Teal Dr Castleton Way Dunford Way (n/o) 49,366 Mill & Fill W. Maude Ave N. Pastoria Avenue
(e/s)
N. Mathilda Ave
(w/s)
63,398 Mill & Fill
E. Arques Ave Fair Oaks Avenue
(e/s)
N. Wolfe Road
(w/s)
119,930 Mill & Fill
Vienna Dr Tasman Drive South end 50,698 Mill & Fill
TOTAL AREA
(SF):
845,787
Street Name Beginning
Location
End Location Area (SF) Treatment
E. Arques
Avenue
Commercial Street Lawrence
Expressway
219,852 Patch &
Crackseal
E. Arques
Avenue
Lawrence
Expressway w/o
island nose
Lakeside Drive
(ctr)
43,313 Patch &
Crackseal
E. Arques
Avenue
Center of Lakeside
Drive
Oakmead
Parkway (ctr)
85,075 Patch &
Crackseal
Hollenbeck
Avenue
El Camino Real
(s/s)
Danforth Drive
(ctr)
109,802 Patch &
Crackseal
Hollenbeck
Avenue
Danforth Drive
(ctr)
Harvard
Avenue (ctr)
49,626 Patch &
Crackseal
Hollenbeck
Avenue
Harvard Avenue
(ctr)
Remington
Drive (n/s)
49,046 Patch &
Crackseal
Hollenbeck Ave
Avenue
Remington Drive
(s/s)
Torrington
Drive (ctr)
47,277 Patch &
Crackseal
Hollenbeck
Avenue
Torrington Drive
(ctr)
Fremont
Avenue (n/s)
50,298 Patch &
Crackseal
Morse Avenue Toyama Drive (ctr) Weddell Drive 53,229 Patch & Crackseal
TOTAL AREA
(SF):
707,518
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 10
Project Title: Wolfe Road Pavement Rehabilitation ST-21-08 (formerly pavement Rehabilitation Wolfe Road), Project is completed; left over funds being used to complete additional work.
Project Description: Previous FY 2021/2022 Projects for FY 2022-23 RMRA Funds (Pavement Rehabilitation and Resurfacing)
Project Location: See table below
Estimated Project Schedule: September 2021 - September2025 Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End Location Area (SF) Treatment
Wolfe Road Fremont Avenue El Camino Real (s/s) 22,637 Mill & Fill Wolfe Road Marion Way Fremont Avenue 152,368 Mill & Fill Wolfe Road Inverness Way Marion Way 88,407 Mill & Fill
Wolfe Road Homestead
Road, City Limit
Inverness Way 69,000 Mill & Fill
TOTAL AREA (SF): 332,412
Project Title: Pavement Rehabilitation 2024-SB1, ST-23-01 (formerly Pavement Rehabilitation 2023)
Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below – Project has been revised to meet budget and timeline constraints.
Estimated Project Schedule: May 2022 – August 2025
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning Location End Location Area (SF) Treatment Persian N driveway of 1280
Persian Dr.
Lawrence
Expressway
24,570 Mill & Fill
Morse 1111 Morse (ctr d/w) Toyama c(tr) 36,871 Mill & Fill San Patricio Coachella (s/s) Duane 15,600 Mill & Fill
Wright Fremont (s/s) Cascade ctr) 51,778 Mill & Fill
Cascade Prince Edward (ctr) Selo (ctr) 23,111 Mill & Fill Cascade Selo (ctr) Sydney (ctr) 8,994 Mill & Fill
Dunford Oriole (e/s) Quail (w/s) 44,730 Mill & Fill
Dunford Quail (w/s) Teal (w/o) 30,710 Mill & Fill
TOTAL
AREA (SF):
236,364
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 11
Project Title: Slurry Seal 2024 B-SB1, ST-23-07 (formerly Slurry Seal 2023 B-SB1) Project Description: Slurry Seal
Project Location: See table below
Estimated Project Schedule: July 2023 – August 2025
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End Location Area (SF) Treatment
Hollenbeck Ave Fremont Ave
(n/s)
El Camino Real
(s/s)
348,240 Patch, Crack
Seal, Slurry Seal
Arques Ave Commercial
St. (e/s)
Lawrence
Expressway (w/s)
306,049 Patch, Crack
Seal, Slurry Seal
Morse Ave Weddell Dr.
(s/w)
Toyama Dr. (n/s)
– curb return
53,229 Patch, Crack
Seal, Slurry Seal
TOTAL AREA
(SF):
707.518
Project Title Pavement Rehabilitation 2025-SB1, ST-23-08 (formerly Pavement Rehabilitation 2024-B)
Project Description: Pavement Rehabilitation and Resurfacing Project Location: See table below
Estimated Project Schedule: July 2023 – November 2025
Estimated Project Useful Life: 10 to 20 years
Street Name Beginning
Location
End Location Area (SF) Treatment
Acacia Avenue Fair Oaks (e/s) –
curb returns
Bartlett Avenue
(w/s) – curb
returns
19,559 Mill & Fill
Molino
Avenue
Sutter Avenue
(s/s) – curb
returns
Olive Avenue
(n/s) – curb returns
23,490 Mill & Fill
Benton Street Kensington
Avenue (n/end)
Lochinvar Avenue
(n/s) – curb returns
16,436 Mill & Fill
Norman Drive El Camino Real –
curb returns
Elizabeth Way
(n/s)
36,774 Mill & Fill
Arbor
Avenue
Worley Avenue
(e/s)
Fair Oaks Avenue
(w/s)
26,495 Mill & Fill
Torrington
Drive
Hollenbeck
Avenue (e/s) –
curb returns
Snowberry Court
(ctr)
47,136 Mill & Fill
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 12
Arlington
Court
Peach Avenue
(w/s) – curb
returns
West end 13,580 Mill & Fill
Humber Court Blackhawk Drive
(e/s) – curb
returns
East end 11,708 Mill & Fill
Kenilworth
Court
Blackhawk Drive
(e/s) – curb
returns
East end 8,582 Mill & Fill
Kinross Court Blackhawk Drive
(e/s) – curb
returns
East end 12,017 Mill & Fill
Britton Avenue Wolfe Road (s/s)
– curb returns
Taylor Avenue
(n/s to w/s) – curb
returns
8,764 Mill & Fill
TOTAL AREA
(SF):
224,541
Attachment 1
T-DPW-190043/81389_2
Council Agenda:6/3/2025
Item No: 13
Adopted by the City Council at a regular meeting held on June 3, 2025, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
RECUSAL:
ATTEST: APPROVED:
__________________________________ _________________________________
DAVID CARNAHAN
City Clerk
LARRY KLEIN
Mayor
(SEAL)
APPROVED AS TO FORM:
__________________________________
REBECCA L. MOON
City Attorney
Attachment 1