Cities Index.
Presentation to Council RTC No 25-0127 - 20250729

Sunnyvale City Council
July 29, 2025

Document
Presentation to Council RTC No 25-0127 - 20250729
Meeting
July 29, 2025
Body
Sunnyvale City Council
Original file
1.9 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Tasman Drive Pedestrian-
Bicycle Improvements Study
(Study Issue DPW 21-03)
Sunnyvale City Council
July 29, 2025
2City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Study Issue DPW 21-03
(RTC No. 21-0047)
• Evaluate the removal of a travel
lane in both directions to install
pedestrian and bicycle facilities
• Tasman Dr. between Fair Oaks
Ave. and Lawrence Expwy.

Existing Conditions
• No bicycle facility
• Intermittent sidewalks
Project Overview

3City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Project Timeline
Perform
Safety &
Traffic
Analysis
Background Review
& Data Collection
Develop
Preliminary
Design
Alternatives
Refine
Design
Alternatives
Sept 2023 Oct 2023 – Nov 2023 Dec 2023 – Jan 2024 Jun 2024 – Sept 2024 Final Report
Oct 2024 – July 2025
Community
Outreach Round 2
Present Refined
Concept Alternatives
BPAC + City Council
Meetings
Selection of Preferred
Alternative
Feb 2024 – Mar 2024 Oct 2024
Community
Outreach Round 1
Introduction of
Proposed Alternatives
City Council Study
Session
Project Updates and
Gather Feedback
Jun 2024 May 2025 – July 2025
4City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Existing Geometric Conditions
VTA Light Rail in Median Landscaping and Sound Walls on Both Sides Example Cross-section Between Fair Oaks Ave. and Vienna Dr. 5City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Tasman Dr. west of Vienna Dr.

Since 2020 (during the COVID-19 Pandemic)
Existing Temporary Condition
• Temporary lane closure on
Tasman Dr. (between Tasman Ct.
and Vienna Dr.)
• Creates a temporary two-way
bicycle and pedestrian pathway
• Includes temporary barriers
separating the path from
vehicular traffic
• Not designed to ADA or for
emergency access

6City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Design Alternative 1:

Multi-Use Path
Design Alternative 2:

Sidewalk and Buffered Bike Lane
Design Alternatives – Not to scale
Example Cross-section Between Fair Oaks Ave. and Vienna Dr. 7City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Design Alternative 1: Multi-Use Path
W Frontage Rd,
Berkeley, CA
Typical midblock cross-section
• Wide surface (12’ min) that pedestrians and bicycles share • Path at sidewalk level, separated from autos by curb and in limited locations by landscaping • Two-way walking and biking travel on both sides of the street • Tree impacts: 12 likely, 66 potential
Multi-Use Path
with raised
curb
Moffett Park Drive,
Sunnyvale, CA
8City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 • Separates bicycles and autos
• Average 6’ wide bike lane
• 4.5’ painted buffer between bikes and autos
• No vertical separation
• Pedestrians are separated from both auto traffic and bike lane by raised curb and in limited locations by landscaping
• Tree impacts: 1 likely, 6 potential
Design Alternative 2: Sidewalk and Buffered Bike Lane
Sunnyvale Ave. north of California Ave.

Typical midblock cross-section
Buffered Bike
Lane
Sidewalk
Buffered Bike
Lane
Sidewalk
9City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Historical Daily Traffic Volumes
Traffic Analysis and Counts
• Count data:
 Temporary lane closure
 Recent counts between Vienna Dr. and
Lawrence Expwy.
• Existing conditions and concerns:
 AM peak eastbound queue at Lawrence Expwy.
 Congestion during Levi’s Stadium events
• Analysis results of lane removal:
 No notable effect to travel time and delay
 Some additional traffic queues eastbound at
Lawrence Expwy.
 No notable effect to queueing west of Vienna Dr.
6,678
5,688
4,948
3,976
4,969 4,6245,095
4,223
5,540
4,582
0 1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Eastbound Westbound
Tasman Dr. between Fair Oaks Ave. &
Vienna Dr.

May 2017 Sept. 2023 Sept. 2024
Jan. 2025 Apr. 2025
-19.5%
-17.1%
10City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Summary of Engagement Rounds 1 & 2
Attendees examine presentation boards at
Casa de Amigos Mobile Home Park
Community engagement activities:
• Two (one per round) hybrid in-person/virtual community meetings • Six mobile home park meetings (three per round)
• Online survey (Round 1) with 371 responses
Promotion included:
• 4,091 postcards mailed to properties in project’s vicinity and the three Mobile Home Park property managers
• Mobile Home Park meeting flyers and emails
• Email notifications to project’s subscription list
• Posted on the City’s website and Social Media channels (e.g.

NextDoor and Facebook)
➢ Engaged with over 400 peopleSticky notes on presentation boards left by meeting attendees

11City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 • DPS has concerns with both design alternatives
 Reduced travel lanes = narrower roadway clear width
 Difficulty accessing mobile homes from Tasman Drive
 Potential need to direct drivers to move over
 Increased response times
• Design Alternative 1 has detrimental impact to public safety
 Drivers cannot pull to right onto raised path
 Emergency vehicles have no room to pass on left
 California Vehicle Code passing laws
• Design Alternative 2 – slightly less concern
 No vertical elements
 Drivers would pull into bike lane
 Emergency vehicles would pass on the left
Public Safety and Emergency Access Impacts
Design Alternative 1
Design Alternative 2
12City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 • Mobile Home Deliveries
 Final design would account for space
 Buffered bike lanes roadway width is
similar to existing
• More Midblock Crossings
 Safety concerns of adding rail crossings
 Grade separated crossings are expensive
 East Channel Trail currently studying
Other Concerns Heard

13City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Phasing Concept
• text
Phase 1 Phase 2
• Concerns with Vienna Dr. to Lawrence Expwy.
• Phase the implementation
• Alternatives for tonight – “a la carte”
14City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Temporary Lane Closure
Temporary
Lane Closure
• Intended to be temporary during shelter in place order • Temporary construction devices
• Not designed to meet ADA requirements
• Not designed for emergency access

15City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – May 2025 BPAC Recommendation
16City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Motion Approved 6-0, 1 abstention
BPAC Recommendation to City Council
• Implement the project (Design Alternative 1) in phases:
 Phase 1 – Remove one travel lane on each direction on Tasman Dr. between Fair Oaks Ave. and Vienna Dr. to install a Class I Multi-use path on both the north and south side of Tasman Dr.  Phase 2 – Remove one travel lane on each direction on Tasman Dr. between Vienna Dr. and Lawrence Expwy. to install either a Class I Multi-Use path or sidewalk and Class IIB buffered bicycle lane on both north and south sides along Tasman Dr. between Vienna Dr. and Lawrence Expwy.
 Continue and expand temporary closure until Phase 1 is completed – continue existing closure and temporary bike lane on eastbound Tasman Dr. Provide a new lane closure and
temporary bike lane on westbound Tasman Dr. between Vienna Dr. and Fair Oaks Ave.

Design Alternative 1

17City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – May 2025 Alternatives
18City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Long-Term Alternatives
Alternative Design Alternative Total Cost
(2025$)
1 1 – Multi-use path,
Fair Oaks Ave to Vienna Dr
$14M - $17M
2 1 – Multi-use path,
Vienna Dr to Lawrence Expwy
$4M - $6M
3 2 – Sidewalks and Buffered bicycle lanes,
Fair Oaks Ave to Vienna Dr
$12M - $16M
4 2 – Sidewalks and Buffered bicycle lanes,
Vienna Dr to Lawrence Expwy
$2M - $3M
5 Maintain existing (pre-pandemic) conditions per Active Transportation Plan, Fair Oaks Ave to Vienna Dr
$0 (without
temp lane
closure removal)
6 Maintain existing (pre-pandemic) conditions per Active Transportation Plan, Vienna Dr to Lawrence Expwy
$0 (without
temp lane
closure removal)
19City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Staff Recommendation
• Alternative 3: Sidewalk and Buffered Bicycle Lane: Fair Oaks to Vienna. Approve Design Alternative 2 to remove one travel lane in each direction on Tasman Drive between Fair Oaks Avenue and Vienna Drive (Phase 1 segment) to install sidewalk and a Class IIB buffered bicycle lane on both north and south sides along this segment, find that the action is exempt from CEQA pursuant to CEQA Guidelines Section 15301(c) and Public Resources Code Section 21080.25(b)(1), and recommend that the City Council direct staff to include the concept plan as an unfunded project in the FY 2025/26 Budget pending future identification of funding. • Alternative 6: Pre-Pandemic Configuration: Vienna to Lawrence. Maintain the existing (pre-COVID- 19 pandemic) Tasman Drive configuration between Vienna Drive and Lawrence Expressway (Phase 2 segment) pursuant to the Active Transportation Plan (no change to pre-pandemic conditions).

Alternative 3 Alternative 6
20City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Temporary Lane Closure Alternatives
Temporary
Lane Closure
• Alternative 7: Remove the existing temporary eastbound Tasman Drive lane closure and bike and pedestrian path.
• Alternative 8: Convert the eastbound temporary lane closure into a buffered bicycle lane and modify one westbound travel lane to install a buffered bicycle lane.
• Alternative 9: Other alternative as directed by Council.

21City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Temporary Lane Closure – Staff Recommendation
• Alternative 7: Remove the existing temporary eastbound Tasman Drive lane closure and bike and pedestrian path.

22City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – May 2025 Thank you!
23City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – May 2025 Back-up Slides
24City of Sunnyvale – Tasman Drive Pedestrian-Bicycle Improvements Study – July 2025 Planning Level Cost Estimates (in current $)
Design Alternative Total Cost (2025$)
1 – Multi-use path,
Fair Oaks Ave to Lawrence Expwy
$18M - $23M
1 – Multi-use path,
Fair Oaks Ave to Vienna Dr
$14M - $17M
1 – Multi-use path,
Vienna Dr to Lawrence Expwy
$4M - $6M
2 – Sidewalks and Buffered bicycle lanes,
Fair Oaks Ave to Lawrence Expwy
$14M - $19M
2 – Sidewalks and Buffered bicycle lanes,
Fair Oaks Ave to Vienna Dr
$12M - $16M
2 – Sidewalks and Buffered bicycle lanes,
Vienna Dr to Lawrence Expwy
$2M - $3M
Maintain existing (pre-pandemic) conditions
per Active Transportation Plan
$0 (not including removal of temporary lane
closure)

← All documents from this meeting