FGR NO. 3
FGR NO. 1

GRIT AND SCREENINGS

HANDLING FACILITY
(AREA 212)
POWER

GENERATION

FACILITY
(AREA 361)

PRIMARY

CONTROL

BUILDING
(AREA
413)

TRANSFORMER
PAD

SCREENING

FACILITY
(AREA 211)

INFLUENT
PUMP

STATION
(AREA 221)

PRIMARY

SEDIMENTATION
TANKS
(AREA 241)
GRIT
BASINS
(AREA 231)

SWITCHGEAR

BUILDING
(AREA 363)

STANDBY

GENERATOR
(AREA 364)

DIGESTER
NO. 1

DIGESTER
NO. 2

DIGESTER
NO. 4DIGESTER
NO. 3

MAINTENANCE

FACILITY

EXISTING

LAB/TERTIARY

CONTROL

BUILDING

CHEMICAL
MIXING
AND

COMPRESSOR

BUILDING

RECYCLE YARD

SUNNYVALE WEST CHANNEL

HEADWORKS

ELECTRICAL

BUILDING
(AREA 255)

HEADWORKS ODOR

CONTROL FACILITY
(AREA 251)

FAN PAD

PERIMETER WALL WITH SECURITY

FENCE (TYP)
(AREA 108)

UTILIDOR
(AREA 201)

ELECTRICAL

SWITCHGEAR

ENCLOSURE

DRAINAGE

PUMPING

STATION

UNIT SUBSTATION
FLOAT

PUMPING

STATION
MH 17
(AREA 107)

LANDFILL GAS FLARE

EXISTING

STORM WATER

JUNCTION BOX
120'60'0 30'

INFLUENT

JUNCTION
BOX (AREA 107)
BCDC 100'

SHORELINE
OFFSET

BORREGAS
AVENUE
FGR NO. 2
DUAL
MEDIA

FILTERS
FILE:

SCALE:

SITE PLAN
1"=60'
XXXX

DATEREV BY DESCRIPTION
10833Z.10

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
OFMAY 2021

CITY OF SUNNYVALE

SITE PREPARATION PROJECT
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
219

IN ASSOCIATION WITH
5/7/21

AUXILIARY PUMP STATION
RAH
ART
GAG
000G11GENERAL

SHORING PLAN
Alaico
11 REFER TO 000G07 FOR STAGING, LAYDOWN, AND

SOIL BORROW REQUIREMENTS ASSOCIATED
WITH THIS AREA.

1. FACILITY EXCAVATIONS SHOWN ON THIS DRAWING REQUIRE

MANDATORY TEMPORARY SHORING AS SPECIFIED IN SECTION
02260. IT IS PROHIBITED TO LAY BACK EXCAVATIONS SHOWN
HERE THAT REQUIRE MANDATORY TEMPORARY SHORING.

2. THIS DRAWING IS NOT A COMPREHENSIVE DEPICTION OF ALL

FACILITIES OR EXCAVATIONS REQUIRING TEMPORARY
SHORING TO COMPLETE CONSTRUCTION OF THIS PROJECT.

SEE SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL
REQUIREMENTS.

3. IN ADDITION TO THE MANDATORY SHORING INDICATED ON THIS

DRAWING, PROVIDE TEMPORARY SHORING FOR EXCAVATION

DEPTHS THAT EXCEED CURRENT OSHA HEALTH
AND SAFETY STANDARDS FOR EXCAVATIONS, 29 CFR PAR 1926
OR OPEN CUT AT A MINIMUM ANGLE OF 1.5:1 (H:V) IF THERE IS SUFFICIENT SPACE.

4. FOR EXCAVATIONS DEEPER THAN ELEVATION 96.0, PROVIDE

IMPERMEABLE SHORING TO PREVENT LOWERING
GROUNDWATER IN THE AREA SURROUNDING THE SHORING.

PROVIDE DEWATERING INSIDE OF SHORING.

5. DO NOT ABANDON TEMPORARY SHORING IN PLACE. REMOVE
ALL TEMPORARY SHORING COMPLETELY. REFER TO SECTION
02260 FOR SHORING REMOVAL REQUIREMENTS.

GENERAL NOTES:

KEY NOTES:

1. CONSTRUCT ADJACENT AT-GRADE STRUCTURES

LOCATED WITHIN THE PERIMETER OF THE BURIED

STRUCTURE SHORING AFTER COMPLETELY REMOVING
TEMPORARY SHORING.

2. GROUND WATER MONITORING WELLS MAY BE MOVED TO

AVOID EXISTING UNDERGROUND UTILITIES OR SURFACE
FEATURES UPON APPROVAL OF THE ENGINEER. PRIOR

TO BEGINNING WELL INSTALLATION, REVIEW DRAWINGS

FOR POTENTIAL CONFLICTS AND POTHOLE THE
PROPOSED LOCATIONS.

MANDATORY TEMPORARY SHORING

REQUIRED FOR CONSTRUCTION OF
FACILITY.

LEGEND:

MANDATORY SHORING REQUIRED FOR
DEMOLITION OF EXISTING FACILITY.

ADMINISTRATION

BUILDING

SE PIPELINE

SS PIPELINE

STD PIPELINE
SD PIPELINE 107D06
A
Attachment 1

Page 1 of 1 ends

GRIT AND SCREENINGSGRIT AND SCREENINGSGRIT AND SCREENINGSGRIT AND SCREENINGSGRIT AND SCREENINGS

HANDLING FACILITYHANDLING FACILITYHANDLING FACILITY
(AREA 212)(AREA 212)(AREA 212)

TRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMERTRANSFORMER

PADPADPADPADPAD

SCREENINGSCREENINGSCREENINGSCREENING

FACILITY
(AREA 211)

INFLUENT
PUMP

STATION
(AREA 221)(AREA 221)(AREA 221)(AREA 221)(AREA 221)

PRIMARY

SEDIMENTATION
TANKS
(AREA 241)
GRIT
BASINS
(AREA 231)

HEADWORKSHEADWORKSHEADWORKSHEADWORKS

ELECTRICALELECTRICALELECTRICAL

BUILDING
(AREA 255)

HEADWORKS ODORHEADWORKS ODORHEADWORKS ODORHEADWORKS ODOR

CONTROL FACILITYCONTROL FACILITYCONTROL FACILITYCONTROL FACILITYCONTROL FACILITYCONTROL FACILITY (AREA 251)

FAN PADFAN PADFAN PADFAN PADFAN PAD

LANDFILL GAS FLARE

FAN PADFAN PAD

LANDFILL GAS FLARE

PRIMARYPRIMARYPRIMARYPRIMARYPRIMARYPRIMARY

CONTROLCONTROLCONTROLCONTROLCONTROL

BUILDINGBUILDINGBUILDINGBUILDINGBUILDING
(AREA(AREA(AREA(AREA
413)413)413)413)

MAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCEMAINTENANCE

FACILITYFACILITYFACILITYFACILITYFACILITYFACILITY

EXISTINGEXISTINGEXISTINGEXISTINGEXISTING
MH 17MH 17
(AREA 107)(AREA 107)(AREA 107)(AREA 107)(AREA 107)(AREA 107) A
107D06107D06
A

LANDFILL GAS FLARE

AUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATION REFER TO 000G07 FOR STAGING, LAYDOWN, AND

SOIL BORROW REQUIREMENTS ASSOCIATED
WITH THIS AREA.

REFER TO 000G07 FOR STAGING, LAYDOWN, AND

LANDFILL GAS FLARE

AUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATIONAUXILIARY PUMP STATION Attachment 1

Page 1 of 1 ends