06/16/26 Bid Summary
Evelyn Avenue Multi-Use Trail
PW26-19
Item Num Description UOM Quantity
1 Mobilization (Recommended to Not Exceed 5%) LS 1 $150,000.00 $150,000.00 $185,000.00 $185,000.00 $180,000.00 $180,000.00 $210,000.00 $210,000.00 $230,000.00 $230,000.00 $210,000.00 $210,000.00 2 Implementation of Construction BMPs LS 1 $22,000.00 $22,000.00 $68,500.00 $68,500.00 $8,000.00 $8,000.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 $45,000.00 $45,000.00 3 Traffic Control LS 1 $55,000.00 $55,000.00 $523,978.00 $523,978.00 $411,349.00 $411,349.00 $589,512.00 $589,512.00 $700,000.00 $700,000.00 $473,000.00 $473,000.00 4 Remove Tree EA 9 $2,090.00 $18,810.00 $860.00 $7,740.00 $1,000.00 $9,000.00 $1,000.00 $9,000.00 $1,000.00 $9,000.00 $708.00 $6,372.00 5 Tree Protection EA 22 $330.00 $7,260.00 $120.00 $2,640.00 $300.00 $6,600.00 $580.00 $12,760.00 $1,000.00 $22,000.00 $300.00 $6,600.00 6 Concrete Demolition LS 1 $103,180.00 $103,180.00 $225,000.00 $225,000.00 $50,000.00 $50,000.00 $98,000.00 $98,000.00 $100,000.00 $100,000.00 $66,700.00 $66,700.00 7 Roadway Excavation CY 1450 $243.00 $352,350.00 $91.00 $131,950.00 $210.00 $304,500.00 $125.00 $181,250.00 $250.00 $362,500.00 $247.00 $358,150.00 8 Cold Plane 2-inch AC SY 6400 $7.04 $45,056.00 $3.00 $19,200.00 $7.00 $44,800.00 $14.00 $89,600.00 $8.60 $55,040.00 $9.45 $60,480.00 9 Topsoil Excavation CY 40 $110.00 $4,400.00 $130.00 $5,200.00 $210.00 $8,400.00 $300.00 $12,000.00 $300.00 $12,000.00 $250.00 $10,000.00 10 Remove Guardrail LF 55 $11.00 $605.00 $51.00 $2,805.00 $10.00 $550.00 $70.00 $3,850.00 $185.00 $10,175.00 $9.50 $522.50 11 Install Guardrail LF 65 $220.00 $14,300.00 $360.00 $23,400.00 $250.00 $16,250.00 $400.00 $26,000.00 $383.00 $24,895.00 $410.00 $26,650.00 12 Remove Sign Panel EA 35 $165.00 $5,775.00 $70.00 $2,450.00 $72.00 $2,520.00 $370.00 $12,950.00 $70.00 $2,450.00 $177.00 $6,195.00 13 Remove Sign & Pole EA 21 $165.00 $3,465.00 $130.00 $2,730.00 $138.00 $2,898.00 $540.00 $11,340.00 $140.00 $2,940.00 $295.00 $6,195.00 14 Cap and Abandon Inlet EA 2 $550.00 $1,100.00 $3,100.00 $6,200.00 $4,600.00 $9,200.00 $5,700.00 $11,400.00 $4,400.00 $8,800.00 $3,300.00 $6,600.00 15 Adjust Storm Drain Covers & Inlet to Grade EA 29 $825.00 $23,925.00 $1,900.00 $55,100.00 $1,100.00 $31,900.00 $1,400.00 $40,600.00 $2,800.00 $81,200.00 $2,500.00 $72,500.00 16 Adjust Traffic Signal & Signal Light Box to Grade EA 18 $825.00 $14,850.00 $200.00 $3,600.00 $155.00 $2,790.00 $390.00 $7,020.00 $160.00 $2,880.00 $168.00 $3,024.00 17 Adjust Sewer Facility Cover to Grade EA 32 $825.00 $26,400.00 $760.00 $24,320.00 $1,100.00 $35,200.00 $1,400.00 $44,800.00 $1,500.00 $48,000.00 $2,500.00 $80,000.00 18 Adjust Water Facility Cover to Grade EA 85 $825.00 $70,125.00 $760.00 $64,600.00 $935.00 $79,475.00 $1,000.00 $85,000.00 $1,000.00 $85,000.00 $1,420.00 $120,700.00 19 Adjust Survey Monument to Grade EA 1 $825.00 $825.00 $980.00 $980.00 $5,400.00 $5,400.00 $1,400.00 $1,400.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 20 Salvage and Relocate Existing Trash Capture EA 1 $825.00 $825.00 $480.00 $480.00 $950.00 $950.00 $400.00 $400.00 $2,200.00 $2,200.00 $1,000.00 $1,000.00 21 12-inch SDR 26 PVC LF 8 $660.00 $5,280.00 $700.00 $5,600.00 $650.00 $5,200.00 $440.00 $3,520.00 $2,400.00 $19,200.00 $1,500.00 $12,000.00 22 12-inch RCP LF 35 $550.00 $19,250.00 $430.00 $15,050.00 $425.00 $14,875.00 $700.00 $24,500.00 $1,650.00 $57,750.00 $900.00 $31,500.00 23 Convert Inlet to SDMH EA 1 $3,300.00 $3,300.00 $6,200.00 $6,200.00 $5,000.00 $5,000.00 $6,700.00 $6,700.00 $1,100.00 $1,100.00 $3,600.00 $3,600.00 24 Install COS 24-inch Curb Drop Inlet EA 4 $4,400.00 $17,600.00 $6,900.00 $27,600.00 $8,200.00 $32,800.00 $5,600.00 $22,400.00 $8,800.00 $35,200.00 $9,800.00 $39,200.00 25 Install COS SDMH EA 2 $5,500.00 $11,000.00 $19,800.00 $39,600.00 $24,400.00 $48,800.00 $22,000.00 $44,000.00 $85,000.00 $170,000.00 $11,000.00 $22,000.00 26 Reconstruct SDMH EA 2 $4,400.00 $8,800.00 $5,200.00 $10,400.00 $14,000.00 $28,000.00 $3,400.00 $6,800.00 $3,300.00 $6,600.00 $1,800.00 $3,600.00 27 COS Sidewalk (4-inch PCC) SF 11000 $24.75 $272,250.00 $19.00 $209,000.00 $19.00 $209,000.00 $14.25 $156,750.00 $25.00 $275,000.00 $18.00 $198,000.00 28 Detectable Warning Surface SF 625 $36.30 $22,687.50 $51.00 $31,875.00 $51.00 $31,875.00 $30.00 $18,750.00 $82.00 $51,250.00 $52.00 $32,500.00 29 12-inch HMA Deep Lift (Type A) TON 1700 $357.50 $607,750.00 $230.00 $391,000.00 $280.00 $476,000.00 $206.00 $350,200.00 $250.00 $425,000.00 $195.00 $331,500.00 30 2-inch Min. HMA (Type A) Overlay TON 1550 $275.00 $426,250.00 $140.00 $217,000.00 $155.00 $240,250.00 $190.00 $294,500.00 $168.00 $260,400.00 $187.00 $289,850.00 31 Base Repair (3-inch Digouts) SF 3000 $7.70 $23,100.00 $10.00 $30,000.00 $7.25 $21,750.00 $14.00 $42,000.00 $10.00 $30,000.00 $13.00 $39,000.00 32 Concrete Median Paving (4-inch PCC) SF 2000 $24.59 $49,180.00 $17.00 $34,000.00 $21.00 $42,000.00 $16.00 $32,000.00 $33.00 $66,000.00 $18.00 $36,000.00 33 Slurry Seal SY 29300 $5.15 $150,895.00 $3.93 $115,149.00 $5.25 $153,825.00 $7.00 $205,100.00 $5.50 $161,150.00 $7.00 $205,100.00 34 COS Curb (Type I-6, Type II, & Type IV-6) LF 5200 $44.00 $228,800.00 $80.00 $416,000.00 $93.00 $483,600.00 $84.00 $436,800.00 $100.00 $520,000.00 $94.00 $488,800.00 35 COS Valley Gutter SF 120 $46.20 $5,544.00 $41.00 $4,920.00 $49.00 $5,880.00 $14.00 $1,680.00 $33.00 $3,960.00 $44.00 $5,280.00 36 Signal Modifications - Bernardo & Evelyn LS 1 $165,850.00 $165,850.00 $132,300.00 $132,300.00 $157,400.00 $157,400.00 $156,000.00 $156,000.00 $145,000.00 $145,000.00 $155,000.00 $155,000.00 37 Signal Modifications - Mary & Evelyn LS 1 $153,250.00 $153,250.00 $138,950.00 $138,950.00 $159,200.00 $159,200.00 $152,000.00 $152,000.00 $146,000.00 $146,000.00 $157,000.00 $157,000.00 38 Rectangular Rapid Flashing Beacons - Sunset & Evelyn LS 1 $36,950.00 $36,950.00 $38,500.00 $38,500.00 $40,200.00 $40,200.00 $38,000.00 $38,000.00 $37,000.00 $37,000.00 $39,500.00 $39,500.00 39 Rectangular Rapid Flashing Beacons - Pastoria & Evelyn LS 1 $36,950.00 $36,950.00 $42,500.00 $42,500.00 $47,800.00 $47,800.00 $45,000.00 $45,000.00 $43,000.00 $43,000.00 $47,000.00 $47,000.00 40 Pavement Striping & Markings LS 1 $209,157.00 $209,157.00 $225,500.00 $225,500.00 $226,000.00 $226,000.00 $234,000.00 $234,000.00 $225,000.00 $225,000.00 $246,800.00 $246,800.00 41 Install New Sign & Pole EA 27 $550.00 $14,850.00 $360.00 $9,720.00 $385.00 $10,395.00 $400.00 $10,800.00 $385.00 $10,395.00 $649.00 $17,523.00 42 Install New Sign Panel EA 32 $250.00 $8,000.00 $160.00 $5,120.00 $165.00 $5,280.00 $173.00 $5,536.00 $165.00 $5,280.00 $295.00 $9,440.00 43 Vertical Element - Delineators EA 400 $110.00 $44,000.00 $76.00 $30,400.00 $83.00 $33,200.00 $86.00 $34,400.00 $82.00 $32,800.00 $130.00 $52,000.00 44 Concrete Wheel Stops EA 790 $70.00 $55,300.00 $91.00 $71,890.00 $99.00 $78,210.00 $103.00 $81,370.00 $100.00 $79,000.00 $82.60 $65,254.00 45 Landscape and Irrigation at Non-Stormwater Treatment Area LS 1 $45,272.00 $45,272.00 $28,200.00 $28,200.00 $37,600.00 $37,600.00 $47,000.00 $47,000.00 $39,000.00 $39,000.00 $29,400.00 $29,400.00 46 Plant Establishment Period LS 1 $22,917.00 $22,917.00 $9,000.00 $9,000.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $10,000.00 $10,000.00 $10,620.00 $10,620.00 47 Tactile Directional Indicators LF 21 $125.00 $2,625.00 $260.00 $5,460.00 $100.00 $2,100.00 $74.00 $1,554.00 $220.00 $4,620.00 $340.00 $7,140.00 48 Improvements at SE Corner of Evenlyn/Bernardo LS 1 $20,282.90 $20,282.90 $11,300.00 $11,300.00 $12,200.00 $12,200.00 $7,000.00 $7,000.00 $8,200.00 $8,200.00 $10,000.00 $10,000.00 49 Improvements at SW Corner of Evelyn/Sunset LS 1 $71,500.00 $71,500.00 $48,100.00 $48,100.00 $26,300.00 $26,300.00 $7,000.00 $7,000.00 $8,200.00 $8,200.00 $42,000.00 $42,000.00 50 Improvements at SW Corner of Evelyn/Pastoria LS 1 $45,100.00 $45,100.00 $34,800.00 $34,800.00 $21,400.00 $21,400.00 $7,000.00 $7,000.00 $8,200.00 $8,200.00 $29,000.00 $29,000.00 51 Roadway Excavation (for Bioretention Areas) CY 150 $143.00 $21,450.00 $87.00 $13,050.00 $240.00 $36,000.00 $190.00 $28,500.00 $460.00 $69,000.00 $190.00 $28,500.00 52 6-inch Plastic Perforated Pipe LF 190 $33.00 $6,270.00 $19.00 $3,610.00 $19.00 $3,610.00 $23.00 $4,370.00 $245.00 $46,550.00 $29.00 $5,510.00 53 Storm Drain Cleanout EA 1 $440.00 $440.00 $610.00 $610.00 $600.00 $600.00 $1,200.00 $1,200.00 $1,650.00 $1,650.00 $800.00 $800.00 54 Overflow Structure EA 1 $3,300.00 $3,300.00 $3,100.00 $3,100.00 $6,300.00 $6,300.00 $9,000.00 $9,000.00 $16,000.00 $16,000.00 $9,000.00 $9,000.00 55 Concrete Lateral Bracing CY 2 $1,980.00 $3,960.00 $2,300.00 $4,600.00 $4,600.00 $9,200.00 $5,100.00 $10,200.00 $2,800.00 $5,600.00 $3,000.00 $6,000.00 56 Planter Walls CY 30 $1,980.00 $59,400.00 $2,600.00 $78,000.00 $4,200.00 $126,000.00 $3,800.00 $114,000.00 $2,800.00 $84,000.00 $4,500.00 $135,000.00 57 12-inch Class II Permeable CY 30 $165.00 $4,950.00 $230.00 $6,900.00 $400.00 $12,000.00 $340.00 $10,200.00 $385.00 $11,550.00 $297.00 $8,910.00 58 Imported Biofiltration Soil CY 45 $132.00 $5,940.00 $210.00 $9,450.00 $290.00 $13,050.00 $260.00 $11,700.00 $130.00 $5,850.00 $265.00 $11,925.00 59 Geosynthetic Liner LF 200 $11.00 $2,200.00 $12.00 $2,400.00 $50.00 $10,000.00 $50.00 $10,000.00 $10.00 $2,000.00 $16.00 $3,200.00 60 Stormwater Treatment Landscape LS 1 $15,356.00 $15,356.00 $8,100.00 $8,100.00 $9,200.00 $9,200.00 $9,100.00 $9,100.00 $11,000.00 $11,000.00 $9,500.00 $9,500.00 61 Temporary Water Service and Irrigation Work at Stormwater Treatment Area LS 1 $35,690.00 $35,690.00 $42,100.00 $42,100.00 $38,000.00 $38,000.00 $38,000.00 $38,000.00 $32,000.00 $32,000.00 $40,000.00 $40,000.00 $3,862,897.40 $3,912,927.00 $4,139,882.00 $4,206,512.00 $4,980,085.00 $4,476,140.50 Bulb out Improvements at SE Corner of Evelyn/Bernardo LS 1 44,000.00$ 44,000.00$ 98,950.00$ 98,950.00$ 52,300.00$ 52,300.00$ 46,570.00$ 46,570.00$ 35,000.00$ 35,000.00$ 57,000.00$ 57,000.00$ Deduct Bid Item No. 48 - Improvements at SE Corner of Evelyn/Bernardo LS 1 (20,282.90)$ (20,282.90)$ (11,300.00)$ (11,300.00)$ (12,200.00)$ (12,200.00)$ (7,000.00)$ (7,000.00)$ (8,200.00)$ (8,200.00)$ 10,000.00$ 10,000.00$ Bulb out Improvements at SW Corner of Evelyn/Sunset LS 1 73,700.00$ 73,700.00$ 93,480.00$ 93,480.00$ 34,300.00$ 34,300.00$ 33,875.00$ 33,875.00$ 27,500.00$ 27,500.00$ 45,000.00$ 45,000.00$ Deduct Bid Item No. 49 - Improvements at SW Corner of Evelyn/Sunset LS 1 (71,500.00)$ (71,500.00)$ (48,100.00)$ (48,100.00)$ (26,300.00)$ (26,300.00)$ (7,000.00)$ (7,000.00)$ (8,200.00)$ (8,200.00)$ 42,000.00$ 42,000.00$ Bulb-Out Improvements at SW Corner of Evelyn/Pastoria LS 1 47,300.00$ 47,300.00$ 83,500.00$ 83,500.00$ 25,800.00$ 25,800.00$ 27,891.00$ 27,891.00$ 27,500.00$ 27,500.00$ 32,000.00$ 32,000.00$ Deduct Bid Item No. 50 - Improvements at SW Corner of Evelyn/Pastoria LS 1 (45,100.00)$ (45,100.00)$ (34,800.00)$ (34,800.00)$ (21,400.00)$ (21,400.00)$ (7,000.00)$ (7,000.00)$ (8,200.00)$ (8,200.00)$ 29,000.00$ 29,000.00$ Micro surfacing SY 29300 5.21$ 152,653.00$ 4.99$ 146,207.00$ 5.30$ 155,290.00$ 5.60$ 164,080.00$ 4.40$ 128,920.00$ 206,565.00$ 6,052,354,500.00$ Deduct Bid Item No. 33 - Slurry Seal SY 29300 (5.15)$ (150,895.00)$ (3.93)$ (115,149.00)$ (5.25)$ (153,825.00)$ (5.56)$ (162,908.00)$ (3.93)$ (115,149.00)$ 205,100.00$ 6,009,430,000.00$ $3,892,772.50 $4,125,715.00 $4,193,847.00 $4,295,020.00 5,059,256.00$ 12,066,475,640.50$ Total Base Bid and Bid Alternative 1, 2, 3, & 4 299 W Jack London Blvd
Livermore, California 94544
21 Hegenberger Ct
Oakland, California 94621
4558 Contractors Place
Livermore, California 94551
3826 Depot Road
Hayward, California 94545
550 Greenville Road
Livermore, California 94550
2513 Wyandotte Street
Mountain View, California 94043
Gradetech, Inc Redgwick Construction Co. Sposeto Engineering Inc.
Total Base Bid
Golden Bay Construction, Inc. FBD Vanguard Construction, Inc. O'Grady Paving, Inc.
Attachment 1
06/16/26 Bid Summary
A, C-12
Chrisp Company
A, HAZ
Chrisp Company
A
American Pavement Systems, Inc.
10%
A, b, C8, C10, C31
Chrisp Company
10%
A, B, C-8
American Pavement Systems, Inc
Bid Bond 10%10% 10%
License
Subcontractors
10%
A, HAZ
Bear Electrical Solutions, LLC