Consistent with the requirements of CEQA Guidelines Section 15063, the IS will include: (1) the project description developed in Task 1; (2) a description of the environmental setting; (3) an evaluation of environmental impacts using the CEQA Guidelines Appendix G environmental checklist; (4) feasible mitigation measures that will reduce any significant impacts to a less-than-significant level, if possible; and (5) the names of individuals who prepared the IS.

Assumptions:
● If one or more environmental impacts are identified during preparation of the IS that have the potential to be significant, ESCO will notify the City immediately. If it is determined that preparation of an EIR is necessary, an amendment to the scope of work and cost estimate would be required.
● The City will provide one set of consolidated comments on the administrative draft IS with any discrepancies resolved.

Deliverables:
● Administrative draft IS (electronic)
Task 6.3 - Screen-check Draft IS/MND
Following receipt of the City’s comments, ESCO will conduct a conference call with the City to discuss comments and agree on revisions to the draft IS. Based on the conference call and comments received, the City will determine whether to continue forward with an IS/MND or whether an EIR may be necessary.

Assuming that an IS/MND is appropriate, ESCO will prepare a screen-check draft IS/MND and draft mitigation monitoring and reporting plan (MMRP), which will be incorporated as an appendix to the IS/MND.

ESCO will prepare a Notice of Intent (NOI), alerting the public to the availability of the draft IS/MND for review. In compliance with CEQA requirements, the NOI will contain a description of the project and location; identification of significant environmental impacts; dates of the public review period; addresses of locations where the draft IS/MND and supporting documents are available for review; and a 442
Section 8, Item B.
33 General
statement of whether the project site is a listed toxic site. A draft and final NOI will be prepared for the City’s review and approval. This work plan assumes that the NOI will be posted on the City’s website and will not be distributed by mail. In addition, ESCO will prepare a newspaper notice based on the NOI for review by the City.

In accordance with CEQA Guidelines Section 15085, ESCO will prepare a Notice of Completion (NOC) for filing along with the IS/MND at the State Clearinghouse. The NOC will contain information describing the project (including location), physical and/or electronic locations where the draft IS/MND is available for public review, and the dates of the 30-day review period.

ESCO will submit an electronic copy of the screen-check draft IS/MND and notices to the City for review. ESCO will finalize the IS/MND and notices based on comments received from the City on the screen-check draft IS/MND. It is assumed that, at this stage, comments will be primarily related to minor editing and document layout and format.

As required by California law (Section 7405 of the California Government Code), the revised screencheck draft IS/MND will then be sent to Allyant, a nationally known accessibility contractor, to be remediated to meet California ADA requirements for file accessibility.

Assumptions:
● The City will provide one set of consolidated comments on the screen-check draft IS/MND with any discrepancies resolved.
● The cost for ADA remediation included in this proposal is an approximation only; the City will be provided a cost estimate from Allyant before submittal of files for remediation. ● The City acknowledges that ESCO cannot control the schedule for remediation; therefore, scheduling of the public review period will be approximate.

Deliverables:
● Screen-check draft IS/MND (electronic)
● Draft MMRP
● Draft NOI, NOC, and newspaper notices
Task 6.4 - Public Draft IS/MND and Public Notices
ESCO will coordinate with a newspaper of general circulation to post the legal notice. ESCO will work with the City to coordinate permission to submit the IS/MND, NOC, and NOI to the State Clearinghouse and County Clerk and will coordinate filing to begin the 30-day public review period.

This work plan assumes that no public meeting will be held to gather public comments on the proposed project.

Assumptions:
● The City will provide one set of consolidated comments on the screen-check draft IS/MND with any discrepancies resolved.
● The cost for ADA remediation included in this proposal is an approximation only; the City will be provided a cost estimate from Allyant before submittal of files for remediation. ● The City acknowledges that ESCO cannot control the schedule for remediation; therefore, scheduling of the public review period will be approximate. ● The State Clearinghouse requires up to 3 days to officially post a document for public review; therefore, scheduling of the public review period will be approximate. 443
Section 8, Item B.
34 General
● No public meeting will be held during the 30-day public review period.

Deliverables:
● Public draft IS/MND (electronic), NOI, and NOC posted to SCH ● NOI provided to County Clerk’s office
● Newspaper notice published
Task 6.5 - Response to Comments Memorandum, MMRP, and Notice of Determination This task assumes that public comments do not result in substantial revision to the impacts or mitigation measures identified in the IS/MND, and that recirculation is not necessary. The level of effort for this task is assumed to address no more than 20 individual comments.

Following the close of the public comment period on the IS/MND, ESCO and the City will review the comments received. ESCO will conduct a conference call with the City to discuss the key comments received and determine the approach to response preparation. ESCO will then prepare a draft and final memorandum that briefly considers the comments received and provides responses for the City’s use in adopting the IS/MND.

In conformance with CEQA Guidelines Section 15132, ESCO will finalize the response-to-comments memo and MMRP for adoption. In addition, ESCO will be available to attend an approval hearing to present information about the CEQA process and the findings of the IS/MND and to answer questions from decision makers.

ESCO will prepare a Notice of Determination (NOD) conforming to CEQA Guidelines Section 15094.

The NOD will identify the project description, location, date of project approval, statement that the IS/MND was adopted, summary of the project’s significant effects, statement of whether mitigation measures were made, conditions of project approval, and the address where the IS/MND can be reviewed. Within 5 days of project approval, ESCO will file the NOD with the local county clerk/recorder and the State Clearinghouse. ESCO will pay county clerk processing fees ($50) and California Department of Fish and Wildlife filing fees (currently $2,968.75) to accompany delivery of the NOD to the State Clearinghouse.

Assumptions:
● This task assumes that public comments do not result in substantial revision to the impacts or mitigation measures identified in the IS/MND, and that recirculation is not necessary. ● The level of effort for this task is assumed to address no more than 20 individual comments.

Deliverables:
● Administrative draft response-to-comments memo (electronic) ● Final response-to-comments memo (electronic)
● Attendance at approval hearing
Task 7 - Environmental Permitting
Task 7.1 - Clean Water Act Section 404 – USACE
The project may require authorization from USACE under CWA Section 404 for fill and/or dredge within jurisdictional waters of the U.S. ESCO will evaluate whether the project may qualify under a Nationwide Permit (NWP). The application package will include:
444
Section 8, Item B.
35 General
● Cover letter to introduce the project;
● PCN form;
● Design Plans (provided by ESCO and the City); and
● Technical studies, including the biological conditions report (Task 5.1), wetland delineation report (Task 5.2), and cultural resources assessment (Task 5.3).

ESCO will prepare and submit a draft NWP application package to the City for review. ESCO will address one round of comments from the City and revise and submit the permit application package to USACE. This scope of work will include up to two conference calls with the City and USACE during the permit application process.

Task 7.2 - CWA Section 401 – RWQCB
The project will require authorization from the Central Valley RWQCB under CWA Section 401 for fill and/or dredge in waters of the state. ESCO will prepare the following permit application items:
● Cover letter to introduce the project;
● Application for Discharges of Dredged or Fill Material to Waters of the State (401 Certification), which is the standard permit application form for RWQCB permits; ● Design Plans (provided by the City and ESCO);
● Technical studies, including the biological conditions report (Task 5.1) and wetland delineation report (Task 5.2);
● Revegetation Monitoring Plan, if needed; and
● CEQA compliance documentation (Task 6).

Before submitting the 401 Certification package to RWQCB, it is now a standard requirement that a Prefiling Meeting be requested. ESCO will prepare a 401 Certification Pre-filing Meeting request for submittal to RWQCB, which will determine whether the meeting will be held. If a meeting is held, ESCO will accompany the City.

The draft 401 Certification package will be submitted to the City for one round of review. ESCO will revise and submit the permit application package to RWQCB. This scope of work will include up to two conference calls with the City and RWQCB during the permit application process.

Supplemental information or data may be requested by RWQCB during the application review process.

ESCO will support the information response process with RWQCB, to the extent that remaining budget is available in this task once the permit application is developed and submitted.

Task 7.3 - California Fish & Game Code Section 1602 – CDFW ESCO will prepare a standard application for a Streambed Alteration Agreement (SAA) following the application format provided in the CDFW Environmental Permit Information Management System (EPIMS) External Permitting Portal. ESCO will also prepare supplemental information, as needed, to support the application. ESCO will prepare and submit a draft version of the application and supplemental information for review by the City. ESCO will revise the application materials based on one round of comments and upload the material to the EPIMS portal. This scope of work will include one conference call with the City and CDFW SAA reviewers during the permit application process.

Task 7.4 - Regulatory Agency Coordination
Under this task, ESCO will support the City with additional regulatory agency coordination to track the permit review and approval process. The tracking and coordination process may include activities such 445
Section 8, Item B.
36 General
as answering questions from regulatory staff on the application materials; providing project updates to the regulatory agencies; preparing memoranda to address regulatory requests for information; and participating in calls, meetings, and site tours with agency representatives.

The budget estimate for this task is based on our experience with similar projects. Actual costs will be dependent on the level of assistance requested by the City. ESCO will provide regulatory coordination services up to the level of effort shown in the cost estimate for this task.

Assumptions:
● If CDFW requests additional information for the application to be considered complete, ESCO will be available to revise and/or supplement the SAA application package within the available budget remaining in this task once the permit application has been developed and submitted. ● If USACE determines that the project does not meet NWP requirements and elects to authorize the project under an alternative permitting pathway, such as a standard permit, then ESCO will discuss the permitting process with the City and an amendment to this scope of work may be required.
● This scope assumes that permanent impacts to waters and wetlands of the U.S./state would be less than 0.1 acre. If the project impacts would exceed this area, then authorization by USACE would be required to qualify for a NWP.
● It is assumed the project can be designed and constructed in a manner that avoids take of federally listed and/or state-listed species. If take of a listed species is unavoidable, an amendment to this scope of work may be required.
● The City will be the primary contact with regulatory agency staff throughout the permitting process. ESCO will provide support as remaining budget for Task 7 allows. ● The cost estimate does not include permit submittal fees or annual permitting fees. Permit submittal fees will be paid by the City or can be added to the budget when known. ● Surveys will be reconnaissance level and daytime events only; no protocol-level surveys will be conducted.

Task 8 - Administrative Record
ESCO will maintain all aspects of the administrative record as it relates to the development of various environmental documents for the duration of the contract. Entries to the administrative record will be collected from technical staff and incorporated into the administrative record. Throughout the project contract, ESCO will make the administrative record readily available to the City upon request.

The complete administrative record will be delivered to the City within 6 weeks following filing of the NOD.
446
Section 8, Item B.
37 General

NON-WASTEWATER TREATMENT FACILITY (WWTF) - IGA SCOPE OF WORK

1. Scope of Work
Scope of work includes a description of the Energy Conservation Measures (ECM), Energy Generation Measures (EGM) and/or Facility Improvement Measures (FIM) and is a preliminary look at different options that will be discussed with the Customer to identify priorities and finalize the Phase 1 scoping project.

A. ESCO will utilize city’s existing energy reports, such as “Distributed Energy Resource (DER) Recommendations Summary” dated March 17, 2025 for solar PV, battery storage and EV charging recommendations at the Auditorium, Community and Admin Building, and Miner’s Bend for purposes of potential project estimates and feasibility. ESCO will use report’s data for solar, battery and EV charging for Phase 1 non-wastewater sites, however, will do own analysis for solar and battery storage sizing at wastewater treatment plant.

B. Additional scope items to be evaluated include lighting and mechanical work at all (7) sites listed in the Facilities table in Section 3. ESCO will work with City to prioritize the oldest HVAC units and any remaining non-LED interior and exterior lighting.

C. Any scope items outside of solar, battery storage, EV charging, lighting and mechanical will fall into Phase 2 after determination of Wastewater Treatment Plant Upgrades scope and financials, for evaluation by ESCO. Examples include: streetlighting, irrigation, building automation, and other energy and water savings measures. During Phase 2, ESCO will also perform due diligence regarding existing energy report data and assumptions as they advance to Phase 2.

2. Phases of Design
The Design Scope of Work shall consist of one phase: Conceptual Development (Up to 30% Design Scoping Meeting).

A. Phase 1: Conceptual Development (Project Scoping)
a. At the Phase 1 final meeting, ESCO shall demonstrate for Customer whether recommended improvement measures are viable and whether financial benefits (including grants) can be derived by their implementation in an amount sufficient to cover costs associated with the Project. b. Scope of work includes a description of the Energy Conservation Measures (ECM), Energy Generation Measures (EGM) and/or Facility Improvement Measures (FIM), a clear understanding of grant criteria and estimated probability of securing grants, calculation of energy and operational savings, and preliminary costs for the construction of the scope.

B. Phase 2: Final Design Development
a. During Phase 2, ESCO will use final scope determination from Phase 1 to put together a firm fixed price for all non-waste water scope, including all due diligence to finalize design documents as well as costs and savings for each ECM.
b. Phase 2 will include: Final scope of work, final fixed firm pricing, financial pro-forma, guaranteed annual energy savings and M&V plan, commissioning plan, operations & maintenance plan, training plan and final drawings and equipment specifications.
447
Section 8, Item B.
38 General

3. Facilities Included
The Design Services will be performed in the following Customer facilities. Any additional facilities to be added in the future must be by mutual agreement between Customer and ESCO:

Facilities
Building Name Address Square Footage Year Built
Auditorium 18 Main St, Sutter Creek, CA 95642 5,040 1928 Community Building 33 Church St, Sutter Creek, CA 95642 3,370 2005 Administrative Building 35 Church St, Sutter Creek, CA 95642 1,155 1880 Historic Grammar School 111 Cole St, Sutter Creek, CA 95642 6,000 1856 Monteverde Store 11 Randolph St, Sutter Creek, CA 95642 1,600 1896 WWTP 340 Mahoney Mill Rd, Sutter Creek, Ca 95642 - -
Miner’s Bend Park 29 Old Rte 49, Sutter Creek, CA 95685 - -

4. Responsibilities
Customer Will:

A. Provide ESCO with all such access, knowledge and history as may be relevant to ESCO’s analysis and/or design, including, without limitation:
(vi) access to Customer’s Facilities, systems and equipment, including remote network access, as necessary or appropriate to facilitate ESCO’s analysis and design (i.e. enabling ESCO to take equipment inventory, determine operating schedules, evaluate known operational deficiencies, perform an energy efficiency analysis, measure actual energy use, etc.); (vi) access to key personnel to discuss operating requirements, maintenance practices, and other information relevant to ESCO’s analysis;
(vi) information relating to any and all known or suspected deficiencies, defects and malfunctions of or affecting the Facilities, systems, equipment and components thereof; (vi) information relating to any site conditions that should be considered in planning and executing the construction services;
(vi) twenty-six (26) months of electric, gas, and water data, including utility billings on meters for all premises owned by Customer; and
(vi) access to copies or loans of such documentation as may be relevant to ESCO’s analysis, including, as applicable and without limitation, Facility plans, equipment lists, and/or other utility invoices.

B. Meet with ESCO to establish Project criteria and make Project decisions in a timely manner.

C. Promptly inform ESCO if at any point Customer becomes aware of any portions of scope that will not be included or funding that will not be available for final Project implementation.

ESCO Will:
448
Section 8, Item B.
39 General
A. Compile information reasonably requested by Customer for purposes of any grant applications being submitted by the Customer in connection with the Project.

B. Conduct a Project programming meeting, Facility walk-through(s) and personnel interview(s) to gain an understanding of Facility operations, concerns, needs, and desired performance criteria.

C. Work with Customer to refine performance requirements, financial criteria, and Project scope.

D. Provide Customer an energy, revenue, and cost savings analysis demonstrating the simple ROI effect of project finances and operations.

E. Provide Customer with a Scoping Proposal setting forth the following:
(iv) Proposed Scope of Work for Phase 2
(iv) Proposed Preliminary Schedule for Phase 2 Development and Phase 3 Construction (iv) Preliminary Project Estimate for Phase 3 Construction 449
Section 8, Item B.
1 General
Appendix I - IGA Scope of Work
Table of Contents
WASTEWATER TREATMENT FACILITY (WWTF) - PROJECT SCOPE OF WORK ........................ 4 Potential Optional Scope Items..................................................................................................... 5 GENERAL IGA SCOPE OF SERVICES............................................................................................ 7 IGA Process and Deliverables ...................................................................................................... 7 Project Management .................................................................................................................... 9 Quality Management .................................................................................................................. 10 General Assumptions and Exclusions......................................................................................... 10 SPECIFIC IGA ENGINEERING SCOPES OF SERVICES .............................................................. 13 Phase 1 – Alternatives Evaluations and Project Definition .......................................................... 13 Waste Water Treatment Facility Design - WWTF Design Phase 1 ............................................ 13 Task 1 – Phase 1 Topographic and Record Boundary Survey for Design Approach .......... 13 Task 2 – Design Criteria and Alternatives Analysis ............................................................ 14 Task 2.1 - Technical Design and Alternatives Analysis Memorandum................................ 14 Task 2.2 - Schematic Design.............................................................................................. 15 Regional Water Quality Control Board – RWQCB Phase 1: ...................................................... 15 Regionalization, Reclamation, Recycling, and Conservation Report .................................. 15 NPDES Permitting Technical Memorandum....................................................................... 15 Environmental Opportunities and Constraints Technical Memorandum.............................. 16 Task 1 - Regionalization, Reclamation, Recycling, And Conservation Report .................... 16 Task 1.1 - Introduction and Background............................................................................. 17 Task 1.2 - Reclamation and Recycling Opportunities ......................................................... 17 Task 1.3 - Regionalization Opportunities and Constraints .................................................. 17 Task 1.4 - Water Conservation Activities............................................................................ 18 Task 1.5 - Best Practical Treatment and Control ................................................................ 18 Task 1.6 - Report ............................................................................................................... 18 Task 2 - NPDES Permitting Technical Memorandum ......................................................... 18 Task 2.1 - Effluent and Receiving Water Quality Characterization...................................... 18 Task 2.2 - Temperature Data Collection............................................................................. 19 Task 2.3 - Projected WWTF Effluent Quality ...................................................................... 19 Task 2.4 - Reasonable Potential Analysis .......................................................................... 20 Task 2.5 - Technical Memorandum .................................................................................... 20 Task 3 - Environmental Opportunities and Constraints Technical Memorandum................ 20 450
Section 8, Item B.
2 General
Task 3.1 - Site Survey........................................................................................................ 20 Task 3.2 - Special-Status Species Research...................................................................... 20 Task 3.3 - Outfall Permit Identification................................................................................ 20 Task 3.4 - Technical Memorandum .................................................................................... 21 California Environmental Quality Act – CEQA Phase 1: ............................................................ 21 Task 1 - Biological Resources Investigation ....................................................................... 21 Task 2 - Cultural Resources Investigation .......................................................................... 21 Task 3 - CEQA Review ...................................................................................................... 22 Task 4 - Environmental Constraints Analysis Report.......................................................... 22 Federal Emergency Management Agency – FEMA Phase 1:.................................................... 22 Task 1 - FEMA Model Request, Background Review, and Field Review ............................ 23 Task 1.1 - FEMA Model Request ....................................................................................... 23 Task 1.2 - Review Background Information........................................................................ 23 Task 1.3 (Optional) - Field Review ..................................................................................... 23 Task 2 - Hydrology and Hydraulic Analyses ....................................................................... 23 Task 2.1 – Hydrology ......................................................................................................... 24 Task 2.2 - Existing Conditions Hydraulic Model Zone A ..................................................... 24 Task 2.3 - Existing Conditions Hydraulic Model Zone AE................................................... 24 Task 3 - Preliminary and Final Hydraulic Reports............................................................... 24 Task 3.1 - Preliminary Hydraulic Report ............................................................................. 24 Task 3.2 - Final Hydraulic Report ....................................................................................... 24 Phase 2 – Detailed Design ......................................................................................................... 26 Waste Water Treatment Facility Design - WWTF Design Phase 2: ........................................... 26 Task 3 – Topographic and Boundary Survey for Detailed Design....................................... 26 Task 4 - Existing Utility Research – Utility ‘A’ Letters.......................................................... 26 Task 5 – Preliminary Design Report Development ............................................................. 26 Task 6 – 30% Design Preparation...................................................................................... 27 Task 7 – 60% Design Preparation...................................................................................... 27 Regional Water Quality Control Board – RWQCB Phase 2: ...................................................... 28 Task 4 - NPDES Permit Coverage for WWTF .................................................................... 28 Task 5 - Antidegradation Analysis ...................................................................................... 28 Task 6 - CEQA Support...................................................................................................... 28 Task 7 - Outfall Permitting.................................................................................................. 28 Task 8 - Design Engineer Coordination.............................................................................. 28 California Environmental Quality Act – CEQA Phase 2: ............................................................ 29 451
Section 8, Item B.
3 General
Task 5 - Technical Studies ................................................................................................. 29 Task 5.1 - Biological Resources Surveys and Report......................................................... 29 Task 5.2 - Wetland Delineation Report............................................................................... 29 Task 5.3 - Cultural Resources Survey and Report.............................................................. 30 Task 6 - Environmental Document ..................................................................................... 31 Task 6.1 - Site Visit and Project Description....................................................................... 31 Task 6.2 - Administrative Draft Initial Study........................................................................ 32 Task 6.3 - Screen-check Draft IS/MND .............................................................................. 32 Task 6.4 - Public Draft IS/MND and Public Notices ............................................................ 33 Task 6.5 - Response to Comments Memorandum, MMRP, and Notice of Determination... 34 Task 7 - Environmental Permitting ..................................................................................... 34 Task 7.1 - Clean Water Act Section 404 – USACE............................................................. 34 Task 7.2 - CWA Section 401 – RWQCB............................................................................. 35 Task 7.3 - California Fish & Game Code Section 1602 – CDFW........................................ 35 Task 7.4 - Regulatory Agency Coordination ....................................................................... 35 Task 8 - Administrative Record .......................................................................................... 36 NON-WASTEWATER TREATMENT FACILITY (WWTF) - IGA SCOPE OF WORK........................ 37 WASTEWATER TREATMENT FACILITY (WWTF) - PROJECT SCOPE OF WORK ...................... 74 Potential Optional Scope Items................................................................................................... 96 GENERAL IGA SCOPE OF SERVICES........................................................................................ 107 IGA Process and Deliverables for Wastewater Treatment Upgrades........................................ 107 Project Management ................................................................................................................ 129 Quality Management .............................................................................................................. 1411 General Assumptions and Exclusions..................................................................................... 1411 SPECIFIC WWTP IGA ENGINEERING SCOPES OF SERVICES .............................................. 1613 Phase 1 – Alternatives Evaluations and Project Definition ...................................................... 1613 Wastewater Treatment Facility Design - WWTF Design Phase 1 .......................................... 1613 Task 1 – Phase 1 Topographic and Record Boundary Survey for Design Approach ...... 1613 Task 2 – Design Criteria and Alternatives Analysis ........................................................ 1714 Task 2.1 - Technical Design and Alternatives Analysis Memorandum............................ 1714 Task 2.2 - Schematic Design.......................................................................................... 1815 Regional Water Quality Control Board – RWQCB Phase 1: .................................................. 1815 Regionalization, Reclamation, Recycling, and Conservation Report .............................. 1815 NPDES Permitting Technical Memorandum................................................................... 1916 Environmental Opportunities and Constraints Technical Memorandum.......................... 1916 452
Section 8, Item B.
4 General
Task 1 - Regionalization, Reclamation, Recycling, And Conservation Technical Memorandum................................................................................................................. 2017 Task 1.1 - Introduction and Background......................................................................... 2017 Task 1.2 - Reclamation and Recycling Opportunities ..................................................... 2118 Task 1.3 - Regionalization Opportunities and Constraints .............................................. 2118 Task 1.4 - Water Conservation Activities........................................................................ 2118 Task 1.5 - Best Practical Treatment and Control ............................................................ 2118 Task 1.6 – Technical Memorandum ............................................................................... 2118 Task 1.7 – Central Valley Water Board Meeting............................................................. 2118 Task 2 – Phase 1 NPDES Permitting Technical Memorandum ...................................... 2219 Task 3 - Environmental Opportunities and Constraints Technical Memorandum............ 2320 Task 3.1 - Site Survey.................................................................................................... 2320 Task 3.2 - Special-Status Species Research.................................................................. 2320 Task 3.3 - Outfall Permit Identification............................................................................ 2320 Task 3.4 - Technical Memorandum ................................................................................ 2320 Task 4 - Effluent and Receiving Water Characterization................................................. 2320 Task 4.1 - Priority Pollutants and Other Constituents of Concern ................................... 2421 Task 4.2 - Temperature Data Collection......................................................................... 2421 California Environmental Quality Act – CEQA Phase 1: ........................................................ 2522 Task 1 - Biological Resources Investigation ................................................................... 2522 Task 2 - Cultural Resources Investigation ...................................................................... 2522 Task 3 - CEQA Review .................................................................................................. 2522 Task 4 - Environmental Constraints Analysis Report...................................................... 2623 Federal Emergency Management Agency – FEMA Phase 1:................................................ 2623 Task 1 - FEMA Model Request, Background Review, and Field Review ........................ 2724 Task 1.1 - FEMA Model Request ................................................................................... 2724 Task 1.2 - Review Background Information.................................................................... 2724 Task 1.3 (Optional) - Field Review ................................................................................. 2724 Task 2 - Hydrology and Hydraulic Analyses ................................................................... 2724 Task 2.1 – Hydrology ..................................................................................................... 2724 Task 2.2 - Existing Conditions Hydraulic Model Zone A ................................................. 2825 Task 2.3 - Existing Conditions Hydraulic Model Zone AE............................................... 2825 Task 3 - Preliminary and Final Hydraulic Reports........................................................... 2825 Task 3.1 - Preliminary Hydraulic Report ......................................................................... 2825 Task 3.2 - Final Hydraulic Report ................................................................................... 2825 453
Section 8, Item B.
5 General
Phase 2 – Detailed Design ..................................................................................................... 3027 Waste Water Treatment Facility Design - WWTF Design Phase 2: ....................................... 3027 Task 3 – Topographic and Boundary Survey for Detailed Design................................... 3027 Task 4 - Existing Utility Research – Utility ‘A’ Letters...................................................... 3027 Task 5 – Preliminary Design Report Development ......................................................... 3027 Task 6 – 30% Design Preparation.................................................................................. 3128 Task 7 – 60% Design Preparation.................................................................................. 3229 Regional Water Quality Control Board – RWQCB Phase 2: .................................................. 3330 Task 4.3 - Continue Effluent and Receiving Water Quality Characterization................... 3330 Task 4.4 - Continue Effluent and Receiving Water Temperature Data Collection ........... 3330 Task 4.5 - Reasonable Potential Analysis / Effluent Limitation Identification................... 3330 Task 5 - NPDES Permit Coverage for WWTF ................................................................ 3330 Task 6 - Antidegradation Analysis .................................................................................. 3330 Task 7 - CEQA Support.................................................................................................. 3330 Task 8 - Outfall Permitting.............................................................................................. 3431 Task 9 - Design Engineer Coordination.......................................................................... 3431 California Environmental Quality Act – CEQA Phase 2: ........................................................ 3431 Task 5 - Technical Studies ............................................................................................. 3431 Task 5.1 - Biological Resources Surveys and Report..................................................... 3431 Task 5.2 - Wetland Delineation Report........................................................................... 3532 Task 5.3 - Cultural Resources Survey and Report.......................................................... 3532 Task 6 - Environmental Document ................................................................................. 3633 Task 6.1 - Site Visit and Project Description................................................................... 3633 Task 6.2 - Administrative Draft Initial Study.................................................................... 3734 Task 6.3 - Screen-check Draft IS/MND .......................................................................... 3734 Task 6.4 - Public Draft IS/MND and Public Notices ........................................................ 3835 Task 6.5 - Response to Comments Memorandum, MMRP, and Notice of Determination3936 Task 7 - Environmental Permitting ................................................................................. 4037 Task 7.1 - Clean Water Act Section 404 – USACE......................................................... 4037 Task 7.2 - CWA Section 401 – RWQCB......................................................................... 4037 Task 7.3 - California Fish & Game Code Section 1602 – CDFW.................................... 4037 Task 7.4 - Regulatory Agency Coordination ................................................................... 4138 Task 8 - Administrative Record ...................................................................................... 4138 NON-WASTEWATER TREATMENT FACILITY - IGA SCOPE OF WORK.................................. 4239 Scope of Work........................................................................................................................ 4239 454
Section 8, Item B.
6 General
Phases of Design ................................................................................................................... 4239 Phase 1: Conceptual Development (Project Scoping) ........................................................... 4239 Phase 2: Final Design Development ..................................................................................... 4239 Facilities Included................................................................................................................... 4339 Responsibilities ...................................................................................................................... 4340 Customer .............................................................................................................................. 4340 ESCO.................................................................................................................................... 4441 PROJECT FUNDING SUPPORT ................................................................................................ 4441 455
Section 8, Item B.
7 General

WASTEWATER TREATMENT FACILITY (WWTF) - PROJECT SCOPE OF WORK
The WWTF is being designed for 0.5mgd average dry weather flow with buildout up to 0.8mgd. The system will be built to accommodate planned growth in the City and will treat effluent to disinfected tertiary standards for recycling as part of a future project. Major WWTF project scope elements include the following, subject to further definition and revision during Phases I and II:
 WWTF Wastewater Treatment System with Equalization
o Influent equalization pond assumed to be a 1,100,000+ lined pond created by converting the existing effluent storage pond. Pond storage may be combined with additional membrane bioreactor (MBR) tankage to meet total equalization and emergency storage volume requirements. Reuse of the existing equalization pond is subject to FEMA review and any required approvals related to floodplain impacts or regulatory constraints. An alternate equalization strategy shall be developed as an optional scope item if reuse of the equalization pond is not feasible.
o Skid-mounted and shop-assembled and tested MBR wastewater treatment system utilizing 304 SS tanks installed on concrete foundations. selected package shall be designed and supplied by Cloacina LLC, Arroyo Grande, CA. o Package to include influent fine screens, equalized flow delivery pumps, anoxic and aerobic treatment tanks, blowers, forward activated sludge pumps, membrane tanks, including additional membrane capacity for peak flow management, clearwell, outdoor inline UV disinfection system or chlorine disinfection system, auxiliary pumps, main control panel, stairs, platforms, and canopies
o Flows pumped directly to WWTF influent fine screens from Lift Station (MBR tanks and equalization basin), with valving and controls system adjustments depending on the final site layout and theory of peak flow operation.
o Chemical storage totes and metering pumps in an outdoor pad with sun/rain cover o Flow to Equalization Basins will pass through exisingexisting course screens, if suitable.  Effluent Transfer Pump Station
o Outdoor horizontal centrifugal variable speed pumps to deliver effluent from clearwell through UV system to Recycled Water Storage Tank or to surface water disposal o Pump station sizing to be similar to WWTF influent flow criteria, based on analysis of future recycled water demands
 WWTF Solids Handling
o Shop-assembled packaged dewatering system consisting of sludge holding tank, feed pump, chemical addition, and volute or screw press dewatering unit installed outdoors under a canopy. Canopy designed by PTV and attached to shop-assembled system or the pad it is mounted on
o Control panel integrated into SCADA
o Discharge to a rolling bin for offsite disposal in a landfill o Evaluation of repurposing existing pond and trickling filter as equalization basin, in addition to an assessment of feasibility for utilizing other available basins as sludge holding basin(s)
Optional: provisions made for future Class A or B biosolids treatment. Provisions limited to allocating a space for additional equipment and stubbed out process connections  Odor Control
456
Section 8, Item B.
8 General
o Provision site layout and connections for future odor scrubber utilizing dry absorptive media (GAC or similar) in a fiberglass scrubber vessel plumbed to scrub air spaces at influent screening, equalization tanks, and site drain pump station, if required by City.

Site location and likely use of effluent storage pond for influent equalization may render odor control of influent screening and other areas less effective. To be analyzed during Phase 1 services
 Yard and Process Piping
o All piping within the WWTF parcel interconnecting process units  Site Features
o Grading to create a flat site with sheet flow drainage offsite, except in process areas (drainage study of surrounding lands not included)
o MOSes to add language on access road, topology survey should include roadway o A high-level assessment of the site drainage in phase 1 of the design, considering the final plant layout. Based of Phase 1 outcome, final scope and level of efforts will be determined in Phase 2.
o Process areas drain to local drain pump station for return to treatment o Process drain pump station with submersible pumps discharging to headworks o LED site lighting with photocell and occupancy sensor o Fire hydrants connecting to existing nearby water supply, assuming an existing fire hydrant is within 500 ft of entrance to the plant. Design and Improvements to the existing water system near new plant site may be required to supply required flow and pressure to site for fire flow. Phase 1 should identify any deficiencies to be addressed in Phase 2. o Hose bibs/yard hydrants for washdown water
o Access for entry, exit, and staging of a crane to perform long-term heavy maintenance and plant expansion
o Curbs and catch basins
o Chain link fencing and gates
 Recycled Water Pumping Facility (future / by others)
o The site layout will allocate space for future pump station, recycled water piping connections, and electrical/comms infrastructure for a future effluent pump station for the potential Gold Rush Ranch recycled water strategy. Provision for a future pump station and its associated electrical infrastructure is included in the current phase. The design and construction of future facilities related to pumping and conveyance of recycled water to GRR will be performed by others. Anticipated to be a pressurized pipeline capable of disposing of 500 AF per year.
 Power
o 480-v 3-phase power distribution (power service and transformer designed by Utility and applied for by Owner, with technical support from ESCO for application and coordination with Utility
o Evaluation and design of an adjacent solar PV & battery storage system to supplement part of the new plant design power needs
o Diesel standby generator(s) and automatic transfer switch, sized to allow plant to operate at full capacity. ESCO must obtain will support the city of obtaining the air permit from Amador County Air Pollution District for generator operation. ESCO will design any backup generators to follow the Amador County Air Pollution District requirements. All permit fees are paid by the city.
o
457
Section 8, Item B.
9 General
 Controls
o Design a SCADA system and radio telemetry system or fiber optic connection as indicated in the Control System Block Diagram to provide for monitoring, trending, and remote access. It is assumed this system will be linked to offsite utility monitoring systems
o Design the integration of the overall SCADA system with the included SCADA system as part of the packaged MBR system
o System integration and programming services will be by a qualified system integrator provided by the ESCO
 Influent Lift Station
o Influent flows into the WWTF will collect in a new influent lift station. The lift station will convey influent to the packaged headworks system. Peak event flows will be screened if possible and buffered in the influent equalization pond. o Sized for peak hour wet weather flow and turndown for average dry weather flow o Concrete cast-in-place wet well with protective coating, concrete lid with spring assist H20 loaded access hatch and safety grating
o Duplex or triplex submersible pumps with discharge elbows and rail systems, design to consider City phasing of influent flows
o Davit crane for pump service and replacement
o SCADA control panel
o Odor scrubber

POTENTIAL OPTIONAL SCOPE ITEMS
The following is a list of potential optional scope items that we have identified during preparation of this RFP Response. We can provide detailed scopes and prices for these items upon request.  Chemical storage building, base scope includes concrete equipment pad and sun/rain cover.  Recycled Water System Model – base scope assumes future recycled water system curve is provided by others.
 Fire sprinkler design (if required) and Master Fire Protection Plan designed by Fire Protection Engineer.
 Operations and maintenance building for the WWTF
 Cast-in-place MBR
 Layout on the adjacent property (uphill) and new EQ strategy assuming project constraints are found to be such that constructing improvements on the existing site is determined to be infeasible
 CEQA+/NEPA documentation if Federal funding is pursued and requires this 458
Section 8, Item B.
10 General

GENERAL IGA SCOPE OF SERVICES

IGA PROCESS AND DELIVERABLES FOR WASTEWATER TREATMENT UPGRADES In general, the IGA will be executed per the three following Phases of the ESCO Team’s process:

1. Phase 1 – Preliminary Assessment: The goal of this phase is to Define Customer Problem(s) and a Create a Prioritized Scope List to Solve those Problem(s). This goal is achieved by completing the necessary due diligence to create Complete Utility, End Use Breakdown & Process BaselineBaselines, Preliminary Process Performance & Energy/ Operational Savings, Preliminary Engineering Control Documents (Basis of Design Report,), and Preliminary Construction Pricing based on AACE Class 4 Estimate. Goals of this Phase also include:
 Advance, evaluate, and compare the cost, schedule, and feasibility of WWTF alternatives.
 Advance permitting, cost estimating, scheduling, environmental review, and other critical project elements to a sufficient level that—at the conclusion of this phase—the City can make an informed decision about project feasibility, risks, costs, schedule, and regulatory concurrence.
 Complete topographic survey and geotechnical investigations required to inform the evaluation and support a subsequent design phase.
 Identify candidate Energy Conservation Measures (ECMs). Evaluate opportunities to reduce long-term operational costs, capital reinvestment needs, and regulatory exposure through replacement or major upgrade of the existing WWTF. The analysis shall quantify both energy savings and non-energy value streams, including cost avoidance, operational efficiency improvements, deferred capital costs, and other benefits.  Identify proposed project funding and potential impacts to City wastewater rates.  Develop a proposed detailed project schedule.

2. Phase 2A – Mid-Term IGA: The goal of this phase is to Obtain Customer Commitments for Technology, Scope and Contract Terms and Conditions. This goal is achieved by completing the necessary due diligence to create Contract Utility, End Use Breakdown & Process BaselineBaselines, Complete Process Performance & Energy/ Operational Savings, Complete Engineering Control Documents (30% Engineering and Design Docs,), Complete Construction Pricing based on AACE Class 3 Estimate, and Complete Construction Terms and Conditions.

3. Phase 2B – Final IGA: The goal of this phase is to Engage in Customer Contract for Construction with Risks (Technically, Financially or Contractually) Mitigated. This goal is achieved by completing the necessary due diligence to create Contract Process Performance & Energy/ Operational Savings, Contract Engineering Control Documents (60% Engineering & Design Docs,), Contract Construction Pricing based on AACE Class 2 Estimate, and Contract Construction Terms and Conditions.

The definitions below are applicable to the level of completeness used in the descriptions above:
● Preliminary: Early versions of design documents that outline the general concepts, ideas, and direction of a project. Typically used to communicate the design concept to stakeholders and to seek feedback on the direction of the project.
● Complete: Final versions of design documents that include all of the necessary information and details to fully execute and implement a project. Once issued, these documents are considered 459
Section 8, Item B.
11 General
frozen and may not be revised or changed without proper approval via the project change management process. With the approval of ESCO, these documents may contain clearly identified holds for missing information such as vendor provided details. ● Contract: Complete versions of documents with final edits for use in contract between Customer and ESCO.

The deliverables of each IGA phase will be formatted to match the Energy Savings Performance Contract attachments, with the level of completeness generally advancing with each successive IGA phase. Some Schedules may not be applicable to Phase 1 Preliminary and/or Phase 2A Mid-Term deliverables. Based on previous construction contracts with other Customers, those attachments could include some or all of the following:
 Schedule A – Scope of Work
 Schedule B – Performance Assurances Support Services
 Schedule C – Performance Guarantee
 Schedule D – Measurement and Verification Plan
 Schedule E – Owner Responsibilities for Performance Guarantee  Schedule F – Start-Up and Commissioning
 Schedule G – Standards of Performance
 Schedule H – ESCO’s Training Responsibilities
 Schedule I – Construction Phasing Plan
 Schedule J – Final Construction Price and Payment Schedule Each of the above IGA Phases consist of the following 6 sequential Sprints:
a. Sprint 0: Kick-Off
b. Sprint 1: Data Collection
c. Sprint 2: Engineering
d. Sprint 3: Estimating and Procurement
e. Sprint 4: Financial Analysis and Report
f. Sprint 5: Stakeholder Engagement
Tasks for each IGA Phase and Sprint are identified below, some tasks may not be applicable to Phase 1 Preliminary and/or Phase 2A Mid-Term deliverables:

1. Sprint 0: Kick-Off
a. Client Goals and Objectives
b. Prioritized Scope List
c. Funding Approach
d. Project Approval Process

2. Sprint 1: Data Collection
a. Site Investigation
b. Client RFI
c. Regulatory Agency Engagement
d. Analysis of Utility and Operational Bills
e. Energy Baseline and End Use Breakdown
f. Process Baseline and Theory of Operations
g. Verification of As-built Equipment Data and Existing Conditions

3. Sprint 2: Engineering
460
Section 8, Item B.
12 General
a. Energy and Operational Savings Calculations
b. Utility Rebates and Other Incentives
c. Engineering Control Documents and Regulatory Compliance (see deliverable details below, under SPECIFC WWTP IGA ENGINEERING SCOPES OF SERVICES heading) d. Phasing Plan
e. Inspection, Testing, Commissioning Acceptance and Turnover Plan (ITCAT) f. M&V Approach
g. O&M Approach
a. Operator Training

4. Sprint 3: Estimating and Procurement
a. Construction Price Estimate
a. O&M Estimates

5. Sprint 4: Financial Analysis and Report
a. Cash Flow Analysis (25-year)
a. Contract Schedules

6. Sprint 5: Stakeholder Engagement
a. Workshop Meetings
b. Deliverables Presentation
c. Stakeholder Review and Comment
d. Comment Discission, Resolution, and Closeout

PROJECT MANAGEMENT
ESCO and its subconsultants (Design Build Team) will perform internal management of the project, schedule, and budget, partner with the project team members, and attend meetings and workshops.

The Design Build Team will prepare meeting agendas, handouts, and minutes for all design meetings.

The Design Build Team will maintain a Project Decision and Action Item log for tracking of all decisions and actions and will update this at each progress meeting and distribute to the team. Project management shall include overall management of the project; team coordination; coordination with the City and any other consultants; regular progress meetings; workshops; and presentations. Project management includes the following meetings, progress reports, and milestones:
 Biweekly Project Team Meetings, virtual
o The Design Build Team shall meet with the City team via virtual meetings on a biweekly basis during Phase 1 and Phase 2
 Customer Project Kick Off & Site Investigation, in person o The Design Build Team will meet with the City at the project site to gather and review the necessary data and documentation required to develop the project design criteria, and to discuss key considerations for selecting the appropriate criteria  Customer Meeting & Site Investigation Teams Recap, virtual o The Design Build Team will meet with the City via virtual meeting to review and discuss the findings from the site investigation and results of documentation review and discuss site planning and preliminary construction phasing observation  Alternative Analysis Workshop/Presentation, in person o The Design Build Team will meet with the City via virtual meeting to review the results of the alternative analysis and make a decision on project direction as a result of the analysis.
 Technical Design and Alternatives Analysis Memorandum Review Meeting, in person 461
Section 8, Item B.
13 General
o The Design Build Team will meet with the City in person to discuss and review comments on the Tech Memo
 Preliminary Design Report (PDR), and 30% Design Project Team Kick Off, virtual or in person o The Design Build Team will meet with the City either remotely, or in person, to kickoff Phase 2 as a result of final approved PDR. The purpose of the meeting will be to align the team on project direction, discuss early project risks and mitigation strategies, permitting strategy, and next steps
 PDR Project Team Presentation, virtual or in person
o The Design Build Team will meet with the City via virtual meeting, or in person, to review the results of the PDR and discuss risks, budget, and schedule  30% Design Project Team Presentation, virtual or in person o The Design Build Team will meet with the City via virtual meeting, or in person, to review the results of the 30% design phase and discuss risks, early procurement items, budget, and schedule
 60% Design Project Team Kick Off, virtual or in person o The Design Build Team will meet with the City either remotely, or in person, to kickoff the 60% design efforts as a result of approval of the 30% design. The purpose of the meeting will be to, again, align the team on project direction, discuss early project risks and mitigation strategies, permitting strategy, and next steps  60% Design Internal Review , virtual
o The Design Build Team will meet via virtual meeting to review the 60% design deliverables and prepare for presentation of the design to the City  60% Design Project Team Presentation, in person
o The Design Build Team will meet with the City in person to review the results of the 60% design phase and discuss risks, early procurement items, budget, and schedule. This meeting will also prepare the Project Team for delivery of Guaranteed Maximum Price (GMP), based on approval of the 60% design
 60% Design & GMP Project Final Scope, Scheduled, and Negotiation o The Design Build Team will meet with the City to address city’s team review comments on the submitted 60% design and GMP . The goal is to discus and anegotiationa negotiation final scope, pricing, scheduled, risks, and early procurement  Regional Board and DDW Permitting Agency Coordination Meetings, virtual o The Design Build Team will meet with the Region 5 Regional Water Quality Control Board and Division of Drinking Water staff assigned to the project to review the design intent at the 30% and 60% design level to align the agencies with the project direction and address any concerns early in the project to minimize schedule interruptions by agency approval. After completion of the first meeting, the Report of Waste Discharge and Title 22 Engineering Reports will be drafted and submitted in draft form to the agencies. After completion of the second meeting, the reports will be updated to draft/final and submitted for permit approval.
 Federal Emergency Management Authority (FEMA) Agency Coordination Meetings, virtual o The Design Build Team will meet with FEMA, if required based on our floodplain analysis, to discuss the potential requirement for a CLOMR and LOMR and work with the agency to determine sequencing, schedule, and next steps  CEQA Coordination Meetings, virtual
o The Design Build Team will meet with the environmental permitting representatives to support the CEQA application process.
462
Section 8, Item B.
14 General
Deliverables:
 Project Decision & Action Item Log, Excel format
 Alternative Analysis, PDR, 30%, 60% Presentations, PowerPoint Format

QUALITY MANAGEMENT
The Design Build Team will perform quality control and quality assurance throughout the design phase of the project. A Quality Assurance/Quality Control (QA/QC) officer will be designated within the firm that is responsible for implementation of the QA/QC plan. The scope items that are performed by the Design Build Team will be peer reviewed internally by Schneider Electric prior to submission to the City.

This process ensures a high level of precision and completion on deliverables prior to release to the various project teams.

For each client deliverable presented for review, Design Build Team will create a Bluebeam Studio review session, for all City and City Representatives (as applicable) to provide comments, track Design Build Team responses, and document closeout of all comments and changes. City and City Representatives will have 2 weeks to review and provide comments for each phase deliverable.

Deliverables:
 Comment and response logs, available upon request

GENERAL ASSUMPTIONS AND EXCLUSIONS

1. No architectural or MEP engineering services are included at the time of proposal based on the fact that a new operations or maintenance building is currently not in the project scope. It is anticipated that the current operations and maintenance buildings will be protected in place.

Prefab options will be explored for a workspace and lab to supplement existing building.

2. The scope of facilities described under the heading “Water Reclamation Facility (WWTF) Project Elements,” above, is the basis for estimating our design effort. If the Preliminary Design phase of the project results in changes to this assumed scope, the design and construction support efforts may change, and a scope amendment may be required.

3. Additional assumptions and limitations are provided under corresponding tasks below.

4. Plan checks by the Building Department, Regional Board, DDW, and FEMA will be conducted in accordance with the overall project schedule for design and implementation. Comments from the Building Department will be limited to applicable building, plumbing, fire, and electrical code matters.

5. ADA compliance design will not be required for the facilities included in this scope.

6. Design for repurposing existing effluent storage pond to proposed influent equalization basin is assumed to be limited to rough and finished grading, levees, liner, pipe penetrations for inlet and pump suction, associated pumping and filtering facilities, access roads, and fencing.

7. Operations and Maintenance manuals will be prepared by equipment suppliers, separate from this scope.

8. Drawings will be prepared in a current version of AutoCAD Civil3D and will be based on Consultant standard drawing format, layering, and title blocks. Use of BIM or 3D design not included.

9. Technical specifications will be based on consultant boilerplate specifications, with City preferences and standards incorporated. Front-end specifications are assumed to not be required for the project.

10. Environmental clearance and permitting will be by ESCO. and coordinated with the design. . 463
Section 8, Item B.
15 General

11. Perimeter landscaping, hardscaping, or decorative fencing or walls not included or by others.

12. City WWTF Operations Team will have the opportunity to assist ESCO with collaborative development of the Project Definition Report, by participating in workshops and through review/comment of deliverables. In addition, collaboration and engagement with operations team on different controls strategies.

13. Any partnering activities would be addressed as part of the bi-weekly meetings. We can optionally add additional scope for separate formal partnering sessions.

14. Sites for facilities will be relatively flat or moderately sloped sites that can be graded for construction of facilities without retaining walls or other special grading features. Drainage will sheet flow off the sites to surrounding lands or discharge from on-site storm drains to outlet structures at the perimeter.

15. Geotechnical recommendations, prepared by others, will allow for slab-on-grade foundations without special foundation measures such as piles.

16. If the water balance determines that additional effluent disposal by spray, leach field, or similar is required, an additional service proposal can be provided for the design of these systems.

They are not included in the base scope.

17. Design scope assumes that all improvements included in this package will be prepared as a single set of plans and specifications with a limited number of early procurement packages.

18. Design fees assume the use of a packaged MBR treatment system manufactured by Cloacina LLC. Phase 2 and 3 design fees could increase by up to 50-100% if a cast-in-place MBR system is selected by the City.

19. Meeting agendas and notes will be the responsibility of ESCO as host of the meeting schedule for the overall project.
464
Section 8, Item B.
16 General

SPECIFIC WWTP IGA ENGINEERING SCOPES OF SERVICES
PHASE 1 – ALTERNATIVES EVALUATIONS AND PROJECT DEFINITION During Phase 1, ESCO will coordinate and manage team members performing multiple design, regulatory, and permitting professional services. The work will be conducted so that feedback from all Phase 1 regulatory and permitting analyses will be incorporated into the Alternative Analysis, Technical Memo, and Schematic Design providing for cohesive technical deliverables.

Wastewater Treatment Facility Design - WWTF Design Phase 1 Overview of Tasks:
 Data and documentation gathering and review
 Site investigation including preliminary topographic and boundary survey as well as geotechnical investigation of subsurface conditions and infiltration testing for any storm water post construction requirements the project may face
 Alternatives analyses regarding WWTF technologies, construction type, location, and phasing approaches
 Review of permitting and regulatory drivers and constraints set forth by the Regional Water Quality Control Board, Division of Drinking Water, CEQA, CalTrans, FEMA, and the local building authority
 Project funding strategy, including potential customer rate impacts  Develop technical design memoranda to describe project constraints, design criteria, and alternatives available to the City
 Preliminary schedule development
 Develop construction scope, schedule, and budget
 Complete a GMP estimate through repeated cost modeling Task 1 – Phase 1 Topographic and Record Boundary Survey for Design Approach ESCO will provide a limited topographic survey of the approximate limits as shown in green in Figure 1 and ESCO will plan to perform survey of access road and adjacent topography and boundary as part of overall WWTF survey efforts to prepare for potential access road improvements required to construct/upgrade WWTF facilities, using a combination of aerial and field mapping. The aerial mapping will be augmented by field survey to locate significant features and be completed by conventional techniques. During the Phase 1 design approach, the surveying effort will be limited to setting aerial control, locating three to four survey monuments and best fit pin the record boundary line work to the mapping, and a limited amount of significant feature measurements to be collected at the engineer’s direction. For budgeting purposes, we have included three (3) ten-hour days, including mobilization, to complete this limited field work.

The survey mapping will be constrained horizontally to the California Coordinate System of 1983 (CCS83), Zone 2 projection and vertically to the North American Vertical Datum of 1988 (NAVD88).

Survey control stations will be set near the edges of the project mapping limits so that they are available for construction survey staking control and likely will remain through construction and the next phases of design. The compiled mapping will be completed with a mapping scale of 1” = 20’ with a onefoot contour interval. 465
Section 8, Item B.
17 General
A preliminary title report(s) will be needed to provide further research tools and a better understanding of the existing parcels and easements. For budgeting purposes, we assume that the title report(s) will be provided by the owner and that no more than four (4) easements will need to be plotted.

The mapping will be provided as a Civil 3d 2024, or newer, survey base map drawing file with digital terrain model (DTM) surface. For budgeting purposes, we have assumed that sufficient monuments exist, no material discrepancies will be discovered, and that filing a Record of Survey or Corner Record will not be required, including in the event that a Record of Survey is required according to Section 8762 of the California Business and Professions Code (BPC) or rehabilitating of controlling monuments used as part of this survey is required due to their condition being less than permanent and durable and other requirements specified by Section 8771.6 of the BPC. However, if as a part of the survey for this project, a Record of Survey or Corner Record is required, or existing monuments are found and determined to need re-establishment to comply with state law the client agrees to authorize additional scope and budget to satisfy these requirements.

Deliverables:
 Civil 3D 2021 or newer Survey Base Map, DWG format
Task 2 – Design Criteria and Alternatives Analysis
Task 2.1 - Technical Design and Alternatives Analysis Memorandum Drafting the Technical Memorandum involves creating a summary document that outlines the initial design concepts, constraints, and alternative approaches for the project. This report serves as a crucial communication tool between stakeholders and team members. The memo will include design criteria, results of floodplain analysis, results of environmental and wastewater discharge permitting analyses, high level summaries of alternatives, and Class 4 AACE cost estimate. The memo will be presented to the City for approval to proceed.
466
Section 8, Item B.
18 General
The memo will include the following items:
 Development and presentation of facility design criteria (flows, loads, volumes, sizes, and configuration)
 Establishment of future expandability requirements for the facility  Location and treatment technology alternatives analysis, including evaluation of repurposing existing facilities to integrate hydraulically and confirm capacity for the intended purpose. The alternatives analysis includes membrane treatment technologies (does not include ceramic or flat sheet), disinfection processes (e.g., in vessel UV, in channel, and chlorine), solids handling and dewatering, and screening for future odor control with a carbon technology.  Preliminary approach
 Capital cost estimate (Class 4 AACE), provided as an attachment and summarized in the report Deliverables:
 Technical Design Criteria and Alternatives Analysis Memorandum, PDF format Task 2.2 - Schematic Design
Develop the schematic design to 10% design completion. The purpose of the schematic design is to coordinate the configuration, layouts, sizes, and major features of the overall design with the City and project team; optimize the project to best meet the project goals; firm up decisions; and obtain consensus on these items for the detailed design. Schematic design drawings will include the following:
 Preliminary Process Flow Diagrams
 Preliminary Hydraulic Profile
 Site plans, including identification of the footprint of future expansion to get to Buildout flow capacity.
 Major yard piping
 Building and equipment footprints and major features
 Major design criteria, equipment sizes, and features
 Existing facilities proposed for reuse and schematic design of rehab/upgrades  Preliminary electrical single-line diagrams
 List of anticipated early procurement items
Deliverables:
 10% Design Package, PDF format
Regional Water Quality Control Board – RWQCB Phase 1:

ESCO originally proposed completing the following activities during Phase 1 of the project:

Regionalization, Reclamation, Recycling, and Conservation Report This report will address the Central Valley Regional Water Quality Board’s (Central Valley Water Board) Resolution No. R5-2009-0028 in support of regionalization, reclamation, recycling, and conservation for wastewater treatment plants. Submittal of this report to Central Valley Water Board executive management is needed before Board management will advance discussions with the City regarding the need for an NPDES permit to allow WWTF effluent discharge to Sutter Creek. Resolution No. R5-2009- 0028 requires that the report address the following elements. 467
Section 8, Item B.
19 General
a. Efforts that have been taken by the City to promote new or expanded wastewater recycling and reclamation opportunities and programs.
b. Water conservation measures promoted by the City.
c. Regional wastewater management opportunities and solutions (e.g. regionalization) available to the City.
d. An evaluation of wastewater reclamation and land disposal as alternative disposal methods to a surface water discharge.

It will be critically important to explain in this report why remaining a part of the Amador Regional Sanitation Authority (ARSA) is not feasible and why the City seeks to construct a new tertiary WWTF that would discharge effluent to Sutter Creek.

NPDES Permitting Technical Memorandum
This technical memorandum will characterize the projected WWTF effluent quality (e.g., conventional pollutants, temperature, priority pollutants) with the new treatment processes compared to expected NPDES permit effluent limitations and reclamation permit requirements, and receiving water quality, which can affect NPDES permit limitations, and other anticipated permitting requirements. Key elements of this task are listed below.
a. WWTF Effluent and Receiving Water Quality Characterization: A characterization of WWTF effluent and Sutter Creek water quality is necessary to support design of the new WWTF, as well as support NPDES permitting and CEQA compliance processes to identify the effects of the WWTF discharge on Sutter Creek water quality and beneficial uses. The data will assist in identifying constituents (e.g., trace metals) or parameters (e.g., temperature) that may pose a challenge for NPDES permit compliance and, thus, require additional investigation into source control options or specific treatment technologies to be incorporated into the WWTF design. b. WWTF Effluent Quality Projections: Characterizing existing WWTF effluent quality establishes the baseline condition, with the expectation that the new WWTF effluent quality will be no worse, and likely better, for many constituents due to improved removal efficiencies. c. Anticipated Effluent Limitations: The Central Valley Water Board makes determinations regarding the need for water quality-based effluent limitations in an NPDES permit through a reasonable potential analysis (RPA). Completing an RPA will be informative because it gives the Project Team advance notice of anticipated NPDES permit limitations, which can be useful for determining the feasibility of the surface water discharge and/or if treatment compliance strategies need to be developed for the project.

Environmental Opportunities and Constraints Technical Memorandum This technical memorandum will address the environmental opportunities and constraints related to the siting of the new WWTF, focused on potential impacts on biological resources, a listing of environmental permits that may be required for construction of the new outfall in Sutter Creek (e.g., Clean Water Act [CWA] Section 404 permit), an overview of the CEQA compliance process, and a timeline and estimated cost for environmental permitting and CEQA compliance. Key elements of this task are listed below.
a. Site visit conducted by ESCO biologists to visually survey for biological resources and potential impact-related issues.
b. Identify federal and state endangered plant, fish, and wildlife species that could be affected by project construction and operation.
468
Section 8, Item B.
20 General
c. Generate a list of potentially relevant environmental permits, such as a CWA Section 404 permit from the U.S. Army Corps of Engineers (USACE) and a CWA Section 401 water quality certification from the Central Valley Water Board. It is expected that any outfall proposed would require a Lake and Streambed Alteration Agreement (LSAA) from the California Department of Fish and Wildlife (CDFW).
d. Develop a preliminary permitting and CEQA compliance schedule and cost estimate.

Completing an environmental opportunities and constraints analysis allows for identifying potential effects of the project, which allows the Project Team to make refinements to the project to reduce or avoid potential adverse environmental effects that would otherwise require costly mitigation or could not be mitigated to a less-than-significant level (i.e., be significant and unavoidable).

The detailed scope of work presented below for the proposed Phase 1 activities has now been streamlined, because ESCO has been informed that Central Valley Water Board staff are in support of the City’s desire to construct and operate a new WWTF that would discharge Title 22, tertiary-treated effluent into Sutter Creek.

Task 1 - Regionalization, Reclamation, Recycling, And Conservation Technical Memorandum The Central Valley Water Board adopted Resolution No. R5-2009-0028 in support of regionalization, reclamation, recycling, and conservation for wastewater treatment plants.

This resolution states that wastewater treatment plants seeking a new NPDES permit shall provide information regarding regionalization, reclamation, recycling, and conservation upon request by the Central Valley Water Board and identifies the type of information to be supplied by the discharger. All wastewater dischargers requesting an NPDES permit must provide an evaluation of wastewater reclamation and land disposal as alternative disposal methods. Central Valley Water Board management staff require this report be prepared and submitted by potential surface water dischargers wanting a new NPDES permit prior to allowing NPDES permitting staff to work with the discharger on a new permit (e.g., hold meetings with discharger, review a report of waste discharge or NOI for coverage under the Municipal General Order).

ESCO will prepare a technical memorandum that addresses the following major topic areas (with anticipated length of discussion in parentheses).

1. Introduction (1/2 page)

2. Background (1 page)
a. Existing Wastewater Treatment Facilities
b. Planned Uses and Development
c. Existing Wastewater Treatment Facilities

3. Regionalization Opportunities and Constraints (1-2 pages)

4. Reclamation and Recycling Opportunities and Constraints (1-2 pages) a. Land Application
b. Indirect Potable Reuse
c. Direct Potable Reuse
d. Local Water Transfer or Exchange

5. Water Conservation Activities (1/2 page)

6. Best Practical Treatment and Control (1/2 page)

7. Conclusions (1/4 – 1/2 page)
Task 1.1 - Introduction and Background
469
Section 8, Item B.
21 General
ESCO will prepare the “Introduction” and “Background” sections of the report using information ESCO has learned through project development, supplemented with information provided by the City regarding planned development and buildout of the WWTF.

Task 1.2 - Reclamation and Recycling Opportunities
ESCO will describe reclamation and recycling opportunities, with input from the City and Project Team.

Task 1.3 - Regionalization Opportunities and Constraints ESCO will describe the regulatory, socioeconomic, and physical factors that make regionalization of the City’s wastewater treatment not feasible, with input from the City and the project team. This section will briefly address why remaining part of ARSA is not recommended and why the City instead seeks to construct a new tertiary WWTF that would discharge effluent to Sutter Creek.

Task 1.4 - Water Conservation Activities
In collaboration with the City, ESCO will describe the City’s current and planned water conservation activities.

Task 1.5 - Best Practical Treatment and Control
Central Valley Water Board Resolution No. R5-2009-0028 regarding regionalization, reclamation, recycling and water conservation states the following:
“State and federal antidegradation policies require Dischargers to demonstrate that degradation from new or expanded discharges are necessary, and to implement best practicable treatment or control of the discharge necessary to maintain the highest water quality consistent with maximum benefit to the people of the State. Regionalization, reclamation, recycling and conservation may enhance the implementation of these policies.” In the state and federal regulations, achievement of “best practical treatment or control” (BPTC) is defined in terms of performance and maintenance of water quality standards via achieving appropriate NPDES permit limitations, rather than specific treatment technologies. ESCO will describe how the term BPTC is addressed in state and federal water quality regulations and policy, and the extent to which the treatment technologies at the existing and proposed new WWTF provide BPTC.

Task 1.6 – Technical Memorandum
ESCO will compile the information developed in Tasks 1.1 through 1.5 a technical memorandum.

ESCO will provide the City and Project Team a draft technical memorandum for review and comment.

ESCO will then prepare a final technical memorandum for submittal to the Central Valley Water Board.

Task 1.7 – Central Valley Water Board Meeting
ESCO will participate in an in-person meeting with Central Valley Water Board executive management at their Rancho Cordova, CA office to convey information contained in the technical memorandum, and solicit questions and input regarding the level of detail in the technical memorandum relative to that needed to advance obtaining an NPDES permit for the proposed WWTF.

Assumptions:
 The above scope and budget assumes that all information ESCO requests from the City and project team in support of the report preparation will be adequately provided in a timely manner. 470
Section 8, Item B.
22 General
 The scope and budget is limited the number of rounds of review specified above.  Central Valley Water Board requests for revisions to the technical memorandum beyond those editorial in nature for clarity, will require additional budget beyond that identified for this task.

Deliverables:
 Draft Technical Memorandum
 Final Technical Memorandum
Task 2 – Phase 1 NPDES Permitting Technical Memorandum
ESCO will prepare a technical memorandum that defines NPDES permitting considerations for a new surface water discharge from the City WWTF to Sutter Creek. This will be similar to the technical memorandum RBI prepared in February 2012. The technical memorandum addressed the following topics.
 Designated beneficial uses of Sutter Creek that must be protected  Analysis of critical design creek flows for dilution credit  Reasonable potential analysis of WWTP effluent data to identify potential NPDES permit effluent limitations to protect beneficial uses
 Likely effluent and receiving water monitoring requirements  Process for obtaining an NPDES permit and estimated cost  Penalties for non-compliance with the NPDES permit
 Identify important NPDES Permit compliance challenges for application of chlorination as an effluent disinfection method. Compare to UV disinfection approach in terms of regulatory compliance benefits and risks and regulatory validation requirements.

ESCO will prepare an updated version of the February 2012 technical memorandum. The update will address several of the above-listed topics. Secondary effluent produced at the City’s WWTF would not represent effluent discharged following tertiary filtration and disinfection upgrades necessary to support surface water discharge. Therefore, updating the reasonable potential analysis is not warranted.

Instead, ESCO will review NPDES permits for similarly sized and situated WWTFs (e.g., Jackson, Placerville, Lathrop, Mountain House) that use tertiary-level treatment (e.g., membrane bioreactor) discharge to surface water and communicate effluent limitations and permit conditions issued to such facilities, relative to treatment technology utilized. ESCO will identify compliance strategies utilized to ensure compliance with such effluent limitations.

The technical memorandum also will include current effluent and receiving water monitoring requirements based on current Central Valley Water Board plans and policies. Finally, the process for obtaining an NPDES permit will be updated to reflect documentation needed to satisfy CEQA and Central Valley Water Board policies, as well as effluent and receiving water data needs. An estimated timeline and cost for each process component will be provided. No updates are needed to address critical design creek flows because all available data (for water years 1936–41 and 1961–80) was compiled previously.

ESCO will provide the City and the project team a draft technical memorandum for review and comment. ESCO will then prepare a final technical memorandum for submittal to the Central Valley Water Board.

Deliverables:
471
Section 8, Item B.
23 General
 Draft Technical Memorandum in PDF
 Final Technical Memorandum in PDF
Task 3 - Environmental Opportunities and Constraints Technical Memorandum Task 3.1 - Site Survey
ESCO biologists will conduct a reconnaissance-level survey of potential locations for the new WWTF and outfall to evaluate site conditions and presence of habitat for terrestrial and aquatic biological species of concern, with the purpose of identifying potential environmental impacts to biological resources from construction and operation of the project.

Task 3.2 - Special-Status Species Research
ESCO will conduct a literature review and database search to determine the potential for presence of special-status plant and wildlife species or their habitat in the project area, including the following sources.
 CDFW’s California Natural Diversity Database
 USFWS Information for Planning and Consultation Species List  California Native Plant Society Electronic Inventory of Rare and Endangered Plants of California Task 3.3 - Outfall Permit Identification
ESCO will develop a list of resource agency approvals and regulatory permits that may be necessary for the construction and operation of a new WWTF outfall in Sutter Creek.

Task 3.4 - Technical Memorandum
ESCO will compile information developed in Tasks 3.1–3.3 into a technical memorandum. The technical memorandum also will address CEQA compliance for the project, provided by ESCO, and provide an estimated schedule and budget for securing the permits needs for outfall construction and operation, and for completing the CEQA compliance process.

Assumptions:
 The scope and budget for this task assumes one (1) site visit by two (2) ESCO biologists.

However, if certain special-status plant species have the potential to be present at the site, additional blooming period surveys may be required.

Deliverables:
 Draft Technical Memorandum in PDF
 Final Technical Memorandum in PDF
Task 4 - Effluent and Receiving Water Characterization
The Effluent and Receiving Water Quality Characterization task consists of monitoring the existing WWTF effluent and Sutter Creek to develop a data set for priority pollutants and other constituents of concern, as well as temperature, which will be used to support the Antidegradation Analysis, NOI for Municipal General Order coverage, and project EIR analyses. Data collected under this task will be evaluated to identify constituent levels that may trigger NPDES permit effluent limitations. ESCO will initiate data collection under Phase 1, as follows. Completion of data collection, the data evaluation 472
Section 8, Item B.
24 General
consisting of a “reasonable potential analysis,” and associated technical memorandum will be completed in Phase 2.

Task 4.1 - Priority Pollutants and Other Constituents of Concern The Central Valley Water Board has established a list of pollutants that it requires Central Valley municipal wastewater dischargers monitor for one year within each NPDES permit cycle. ESCO anticipates that quarterly sampling of the WWTF effluent and Sutter Creek will be needed, which is the typical sampling frequency required by the Central Valley Water Board for similarly sized WWTFs.

ESCO will provide the following services under this task.

1. The ESCO Project Manager and an ESCO Project Scientist will conduct a site visit to WWTF and Sutter Creek to identify sample collection locations.

2. ESCO will prepare a brief Sampling and Analysis Plan defining sample collection locations, frequency, and methods; analytical laboratories, methods, and detection limits; and QA/QC protocols.

3. An ESCO Project Scientist will obtain sample bottles, collect samples from the WWTF and Sutter Creek, and arrange for sample delivery to the contract laboratory. ESCO will use its field meters to measure electrical conductivity, temperature, and pH while onsite each month, so that sufficient data is collected to calculate ammonia effluent limitations. Sampling events will be coordinated with retrieval of temperature logger data under Task 4.2.

4. ESCO will review laboratory reports to verify all required analyses are completed, identify potential QA/QC issues, and determine the need for any resampling.

5. ESCO will compile data into an MS Excel database in the standardized format used by the Central Valley Water Board when preparing the Municipal General Order NOA and NPDES permits.

Task 4.2 - Temperature Data Collection
Collecting WWTF effluent and Sutter Creek temperature data is necessary to support the NPDES permitting process and the CEQA EIR impact analyses on water quality and aquatic biological resources of the creek. A minimum of 12 months of data collection is recommended. ESCO will provide the following services under this task.

1. ESCO will monitor effluent and creek temperatures on an hourly frequency using HOBO Temperature Loggers (Onset Corporation ®). These data loggers are battery-powered, research-grade instruments that are widely used for monitoring water temperatures.

2. As part of the site visit to establish monitoring locations in Task 4.1, ESCO will establish the temperature monitoring locations.

3. ESCO will deploy the loggers during the initial site visit and, thereafter, retrieve data from the loggers once per month for four months (see “Assumptions” below).

4. ESCO will offload data from the shuttle to the company server, review the data for abnormalities (e.g., outliers, air temperature readings), and compile the data into a temperature database (MS Excel or Access) to facilitate future data analyses.

Assumptions:
 Given that Task 4 in Phase 1 is planned to last 5 months, the fee in Phase 1 assumes that only one round of sampling under Task 4.1 will be completed, and there will be up to four trips to the site for temperature data retrieval under Task 4.2. Continuation of data collection to complete a full 12 months by ESCO will be contingent on a contract amendment to include Phase 2. 473
Section 8, Item B.
25 General
 Laboratory analytical costs are estimated based on ESCO’s experience conducting similar studies for other Central Valley Water Board dischargers. Actual costs will be determined as part of developing the Sampling and Analysis Plan, and the fee in Phase 1 may need to be adjusted accordingly.

Deliverables:
 Initial databases with effluent and receiving water characterization and temperature data California Environmental Quality Act – CEQA Phase 1:

Task 1 - Biological Resources Investigation
ESCO will conduct a desktop survey to review information on potential biological resources at the project site. Data sources may include U.S. Geological Survey quadrangle maps, U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consulting (IPaC), the California Natural Diversity Database (CNDDB), species data compiled by the California Native Plant Society (CNPS), and other technical literature related to the biotic resources in the project vicinity. ESCO will coordinate with the City to determine if existing documents, studies, and reports are available that provide relevant information related to biological resources in the project area. ESCO will also review aerial photographs of the area, if available, to identify potential habitat types, water resources, presence of special-status species, and other biological constraints.

Task 2 - Cultural Resources Investigation
The potential for presence of potential historic resources and buried archaeological sites will be evaluated at a preliminary level by conducting a desktop assessment using relevant maps and documents (e.g., archaeological studies, geologic reports, Quaternary geologic maps, soil surveys).

ESCO will develop an Area of Potential Effects (APE) map for use in evaluating cultural resource impacts for the project area.

The APE will include the current WWTF as well as City-owned parcels (018-002-031 and 018-002-032) in an area bounded by Mahoney Mill Road, Highway 49 to the west, the residences behind Oro Madre Way to the east, and Sutter Ione Road to the north, which have been identified as optional sites to locate portions of the WWTF expansion within. The APE will be submitted for review and confirmation by the City.

Upon approval of the APE, ESCO will conduct a record search at the North Central Information Center (NCIC) of the California Historical Resources Information System at California State University, Sacramento, in Sacramento. This review will identify any previously recorded cultural resources within ¼ mile of the APE in order to (1) determine whether known cultural resources have been recorded within or adjacent to the project area; (2) determine whether any cultural resources studies have previously been conducted within or adjacent to the project area; (3) assess the likelihood of unrecorded cultural resources based on historical references and the distribution of environmental settings of nearby sites; and (4) develop a context for identification and preliminary evaluation of cultural resources. NCIC record search results are usually received within 4 weeks of the request for the search.

Task 3 - CEQA Review
ESCO will conduct a desktop review of the resource topics included in the CEQA Guidelines Appendix G Environmental Checklist to identify potential for significant environmental impacts. We will consult 474
Section 8, Item B.
26 General
Federal Emergency Management Agency (FEMA) flood insurance rate maps to identify which portions of the project area are within the 100-year floodplain. To evaluate the potential for hazardous materials to be located within or near the project site, ESCO will conduct a search of the Department of Toxic Substances Control’s (DTSC) EnviroStor database (https://www.envirostor.dtsc.ca.gov/public/) and consult DTSC’s Cortese List to identify any known contamination sites within a 0.25-mile buffer of the potential project sites. Noise and air quality requirements will be reviewed to determine appropriate setback distances from sensitive receptors adjacent to the project area. We will also identify other constraints requiring additional analysis and will include recommendations for how to address these constraints. In addition, ESCO will identify responsible agencies and other federal, state, and local agencies that may have jurisdiction and/or approval authority over part or all of the project or project site.

We will also review the City’s general plan, water and wastewater planning documents, and other relevant materials provided by the City.

Task 4 - Environmental Constraints Analysis Report
ESCO will prepare a draft environmental constraints analysis report that describes the findings with regard to biological resources, cultural resources, CEQA resource topics, and the appropriate level of CEQA evaluation. The report will include recommended next steps, such as a site visit and field surveys, that could help to identify project modifications that might avoid and/or minimize potential impacts to sensitive biological and cultural resources. ESCO will submit a draft report to the City for review.

If desired, ESCO will attend a virtual meeting with the City to present an overview of the environmental constraints analysis and our proposed approach for achieving CEQA compliance in an efficient manner based on previous experience.

Following review and comment by the City, ESCO will revise the report and provide a final version.

Assumptions:
 No site visit or field survey will be conducted under this Phase 1 portion of the scope of work.

Deliverables:
 Draft and revised environmental constraints analysis report (electronic) Federal Emergency Management Agency – FEMA Phase 1:

The current floodplain and floodway limits include a FEMA Zone A, adjacent to the wastewater treatment facility (WWTF), and Zone AE (with a floodway overlay) at the upstream limits of the WWTF.

The purpose of this study is to perform the hydrology and hydraulic modeling to determine the floodplain limits adjacent to the existing WWTF and determine if there is a tie in upstream at the Zone AE limits shown in the Figure below.
475
Section 8, Item B.
27 General
Task 1 - FEMA Model Request, Background Review, and Field Review Task 1.1 - FEMA Model Request
The ESCO team will request the effective FEMA hydrology and hydraulic analyses from the FEMA library.

Task 1.2 - Review Background Information
ESCO will review all available background material, including the FEMA models requested in Task 1.1, for the project. This will include reviewing available as‐built plans for the culverts and roadway design provided by others.

Task 1.3 (Optional) - Field Review
ESCO will field review the project location to determine Manning’s roughness coefficients and any additional characteristics of the project site which would need to be included in the hydraulic model.

Assumptions:
 A quality FEMA model is available from the FEMA library.

Deliverables:
 A summary of the background and field reviews will be included in the Final Hydraulic Report.

Task 2 - Hydrology and Hydraulic Analyses
Task 2.1 – Hydrology
476
Section 8, Item B.
28 General
ESCO will create hydrographs with a peak flow equivalent to that of the FEMA published 100‐year discharge for use in the 2D hydraulic model. ESCO will do this by creating a HEC‐RAS 2D point precipitation model.

Task 2.2 - Existing Conditions Hydraulic Model Zone A
ESCO will create a 2D hydraulic model of the existing conditions at the project site based on existing topographic information (LiDAR), and as‐built information for the existing bridge using HEC‐RAS version 6.5 or newer.

Task 2.3 - Existing Conditions Hydraulic Model Zone AE
ESCO will determine if the Zone AE is within the WWTP right of way and if mapping updates are needed to remove it from the Zone AE. If mapping updates are needed, a separate task order will be required.

Assumptions:
 The discharges determined by FEMA are sufficient for this analysis. Determining the peak discharges is not included in this scope of work.
 Available LiDAR data will be used as the basis for terrain data within the HEC‐RAS modeling.  As‐built plans provided by others.
 The proposed WWTF upgrades do not change any grading within the floodplain/floodway limits.  No FEMA submittals, Conditional Letter of Map Revision (CLOMR), Letter of Map Revision (LOMR) or formal No‐Rise analysis will be completed as part of this scope of work.  No 500‐year floodplain modeling
 Refinement of scope and fee for Phases 2A and 2B will occur at end of Phase 1, based on outcome and accuracy of assumptions above.

Deliverables:
 Details of the hydraulic analysis will be included in the Preliminary and Final Hydraulic Reports completed in Task 3.

Task 3 - Preliminary and Final Hydraulic Reports
Task 3.1 - Preliminary Hydraulic Report
ESCO will complete a Preliminary Hydraulic Report documenting the hydrology and hydraulic results for the existing conditions, and up to two proposed alternatives.

Task 3.2 - Final Hydraulic Report
ESCO will update the Preliminary Hydraulic Report to a Final Hydraulic Report, incorporating any comments on the Preliminary Report and documenting the results of the hydrology and hydraulics for the final proposed condition modeling.

Assumptions:
 The proposed project will not result in an increase in the water surface elevation and a “no rise certification”, Conditional Letter of Map Revision (CLOMR), or Letter of Map Revision (LOMR) will not be required. If a no rise, CLOMR or LOMR are required, this would require a separate task order.
477
Section 8, Item B.
29 General
 Preliminary hydraulic modeling results can only be prepared after receipt of FEMA library information for the existing hydrology and hydraulics.

Deliverables:
 Preliminary and Final Hydraulic Report will be provided via electronic mail. If FEMA's findings indicate that additional study is necessary, ESCO will address this requirement during Phase 2. 478
Section 8, Item B.
30 General
PHASE 2 – DETAILED DESIGN
During Phase 2, ESCO will coordinate and manage team members performing multiple design, regulatory, and permitting professional services. The work will be conducted so that feedback from all Phase 2 regulatory and permitting analyses will be incorporated into the Preliminary Design Report, 30% Design, and 60% Design, providing for cohesive technical deliverables.

Waste Water Treatment Facility Design - WWTF Design Phase 2:

Overview of Tasks:
 Perform detailed topographic survey
 Complete the Project Definition Report (assume 15% design)  Develop the design to 30% and 60% completion (design progression from 60% to 100% is part of the construction in Phase 3)
 Prepare permitting applications and supporting reports  Preparation of Guaranteed Maximum Price (GMP)
Task 3 – Topographic and Boundary Survey for Detailed Design During Task 1 and phase 2 of the project, we will collect measurements to refine the retracement of the property boundary and measurements within the treatment plant at the direction of the engineer as needed for further informing their design and engineering. This includes pipe inverts, major structures, drainage structures, equipment pads, and other improvements. This does not include survey of the interior of equipment buildings. For budgeting purposes, we have included up to four (4) ten-hour days, including mobilization, to complete these measurements. These measurements will be compiled and incorporated into the existing Civil 3d survey base map.

Deliverables:
 Civil 3D 2021 or newer Survey Base Map, DWG format
Task 4 - Existing Utility Research – Utility ‘A’ Letters We will use the Amador County’s Underground Service Alert web portal to obtain a list of utility providers and operators within and adjacent to the project site. We will contact and request utility information and atlas maps from each of the utility companies listed as part of this inquiry via certified return receipt mailers, or as indicated by their preferred contact method if provided through the Underground Service Alert inquiry. We will document the correspondence process and share with the client the information we obtain. The information returned from the utility companies showing the location of existing utilities will be digitized and shown with the existing utility base map. We are assuming that up to 5 utility companies will require contact and have utility infrastructure in the project area that should be shown on the existing utility base map. The digitized record utility information will be married and resolved with the survey measurements of existing utilities and utility markings.

Deliverables:
 Utility ‘A’ Letters, PDF format
Task 5 – Preliminary Design Report Development
Drafting the Preliminary Design Report (PDR) involves creating a comprehensive document that outlines the initial design concepts, requirements, and considerations for the project. This report serves as a crucial communication tool between stakeholders and team members. The report will include 479
Section 8, Item B.
31 General
purpose and scope, requirements, standards, design concept and alternatives, challenges, and risks.

The report and schematic design, below, will be presented to the City for consideration for Approval to Proceed.

The PDR will include the following items:
 Development and presentation of facility design criteria (flows, loads, volumes, sizes, and configuration)
 Target effluent quality for the selected treatment technology and configuration demonstrating ability to comply with the anticipated discharge requirements  Evaluation of alternatives
 Up to two alternatives for treatment system locating, sizing, and configuration, including the footprint and connections required for expanding the WWTF in the future to the identified Buildout flow. The alternative analysis will be based on FEMA outcomes, geotechnical studies, and effluent requirements, with consideration given to the most feasible options to minimize additional costs.
 Up to two alternatives for WWTF technology, including cast-in-place and packaged membrane bioreactor systems, considering location, size, cost, and future expansion.  Evaluation of opportunities to reuse/repurpose existing structures  Up to two alternatives locating and hydraulically configuring the site influent lift station  Schematic drawings ( listed in Task 2.2 above)
 Recommendation of preferred alternative based on feasibility, affordability, and risk  Preliminary construction sequencing and phasing plan demonstrating feasibility of the proposed approach
 Capital cost estimate, prepared by Project Team as an attachment and summarized in the report
 Preliminary project schedule, prepared by Project Team as an attachment and summarized in the report
 Life cycle cost estimate, prepared by Project Team, incorporating life cycle cost estimate for the MBR systems and preliminary O&M staffing estimates supported by the City’s operations staff  Identification of value engineering opportunities to be further examined collaboratively as the design progresses
Deliverables:
 Draft Preliminary Design Report, PDF format
 Final Preliminary Design Report, PDF format
Task 6 – 30% Design Preparation
Upon Approval to Proceed by the City as a result of approval of the PDR, the Design Build Team will develop the Design Documents to 30% design completion. Preparation of a table of contents for technical specifications will be provided with the 30% submittal. All major drawing sheets will be included with this submittal to convey the overall project direction. The 30% design package will be presented in a design review meeting.

Deliverables:
 Draft 30% Design Package, PDF format
 Final 30% Design Package, PDF format
480
Section 8, Item B.
32 General
The following drawings will be submitted during this phase:

1. Title Sheet 13. Overall Yard Piping
Plan

25. Placeholder Sheet X of
X for Effluent Dispersal

2. General Notes 14. County Standard
Details, Sheet X of X

26. Mechanical Details,
Sheet X of X

3. Legend, Abbreviations,
and Symbology

15. Civil Typical Details,
Sheet X of X

27. Structural Notes

4. Process Design Criteria 16. Civil Details, Sheet X
of X

28. Structural
Abbreiviations, Legends,
Symbology

5. Process Flow Diagram 17. Equipment and Pipe
Tables

29. Overall Structural Site
Plan

6. Overall Site Plan 18. Overall Mechanical
Plan

30. Electrical Notes

7. Demolition Plan -
Overall

19. Influent Liftstation Plan
& Sections, Sheet X of X

31. Electrical
Abbreviations, Legends,
Symbology

8. Demolition Plan -
WWTP Area

20. Influent Equalization 32. Overall Electrical Plan

9. Demolition Plan -
Equalization Pond

21. Membrane Bioreactor
Plan & Sections, Sheet X
of X

33. Overall Single Line
Diagram

10. Demolition Plan -
Temporary Facilities

22. Solids Handling Plan &
Sections, Sheet X of X

34. Lighting Plan

11. Overall Grading Plan 23. Odor Control Plan &
Sections, Sheet X of X

12. Pipe, Structure Tables 24. Effluent Liftstation Plan & Sections, Sheet X of X
Task 7 – 60% Design Preparation
Upon Approval to Proceed by the City as a result of approval of the 30% design package, the Design Build Team will develop the Design Documents to 60% design completion. Preparation of draft technical specifications will be provided with the 60% submittal. All drawing sheets will be included with this submittal with the exception of some detail sheets. The 60% design package will be presented in a design review meeting for City Staff and City Representative review and comment, per procedure referenced above.
481
Section 8, Item B.
33 General
As part of the 60% design task, the Design Build Team will utilize the project team’s construction and operations expertise to perform internal reviews of designs under development and provide input to maximize ease-of-construction, cost-effectiveness, and value while minimizing the cost of long-term operations and maintenance. ESCO will incorporate input into the design where appropriate.

Finally, the Design Build Team will prepare the GMP and construction schedule by information collection (such as vendor quotes) and interpreting the design intent. This coordination will include review of equipment cutsheets and quotations, procurement scope breakdowns, and other documentation as required.

Deliverables:
 Draft 60% Design Package, PDF format
 Final 30% Design Package, PDF format
Regional Water Quality Control Board – RWQCB Phase 2:

The following scope of work is provided with less detail as compared to the Phase 1 scope of work, to provide a non-binding, indicative budgetary estimate for Phase 2:

Task 4Task 4.3 - Continue Effluent and Receiving Water Quality Characterization Continuation of balance of scope of work as described in Phase 1, Task 4.

Task 4.4 - Continue Effluent and Receiving Water Temperature Data Collection Continuation of balance of scope of work as described in Phase 1, Task 4.

Task 4.5 - Reasonable Potential Analysis / Effluent Limitation Identification Continuation of balance of scope of work as described in Phase 1, Task 4.

Task 5 - NPDES Permit Coverage for WWTF
ESCO will advance the NPDES permitting for the new WWTF by developing the Notice of Intent (NOI) for coverage under the Central Valley Water Board’s Order No. R5-2023-0025, “Waste Discharge Requirements for Municipal Wastewater Dischargers that Meet Objectives/Criteria at the Point of Discharge to Surface Water (Municipal General Order),” and support reviewing and negotiating the terms of the Notice of Applicability (NOA) issued by the Central Valley Water Board for Municipal General Order coverage.

Task 56 - Antidegradation Analysis
ESCO will prepare the Antidegradation Analysis, which will need to be submitted with the Municipal General Order NOI. The Antidegradation Analysis will characterize how the new WWTF effluent discharge to Sutter Creek will affect water quality downstream of the discharge and will demonstrate that the anticipated degradation is consistent with the state’s Antidegradation Policy embodied in State Water Resources Control Board Resolution No. 68-16. The Antidegradation Analysis also will support the CEQA document analyses of water quality impacts.

Task 67 - CEQA Support
ESCO will support preparation of the environmental impact report (EIR) for CEQA compliance by preparing the Hydrology and Water Quality, and Aquatic Biological Resources chapters, and other 482
Section 8, Item B.
34 General
related resource sections, of the EIR (e.g., alternatives analysis and cumulative impacts analyses for these resource categories).

Task 78 - Outfall Permitting
Based on final design and siting of the WWTF outfall, ESCO will make final determinations for permits needed for outfall construction. Should a CWA Section 404 permit and Section 401 water quality certification be required, ESCO will prepare the applications to obtain these permits as well as the LSAA.

Task 89 - Design Engineer Coordination
Because the WWTF discharge to Sutter Creek would be new, the Central Valley Water Board cannot issue compliance schedules for NPDES permit limitations prior to the new discharge. Therefore, ESCO will coordinate with Project Team WWTF engineers regarding NPDES permit limitations to be met by the new WWTF, so that the facility can comply with the Municipal General Order NOA upon discharge to Sutter Creek. Furthermore, ESCO wastewater engineers will coordinate with Project Team WWTF engineers to advise on PLC and SCADA programming of alarms and meters to facilitate operational compliance and the collection of all necessary effluent quality and quantity information to facilitate preparation of routine (e.g., monthly, quarterly) electronic self-monitoring reports that will be required by the NOA.

California Environmental Quality Act – CEQA Phase 2:

Task 5 - Technical Studies
Task 5.1 - Biological Resources Surveys and Report
Based on the information gathered during the desktop review in Task 1, ESCO will conduct a single reconnaissance-level field survey of the proposed project area to document the existing biological conditions. ESCO will describe the dominant habitat and characterize both botanical resources and wildlife habitat values in the project area. The reconnaissance survey will also be used to determine the potential for occurrence of special-status plants and animals, although no species-specific or protocollevel surveys are proposed. Regulated habitats, such as wetlands and other waters of the U.S./state, will be mapped in Task 5.3.

ESCO will prepare a draft report that describes existing biological conditions, including existing habitats, potential for occurrence of special-status plants and animals, potentially jurisdictional or sensitive habitats, and any other biological resources that might be of concern. The report will also describe minimization measures that would reduce impacts to sensitive biological resources. ESCO will submit a draft report to the City for one round of review and comment. Following review, ESCO will revise the report. The revised report will be used to support preparation of the CEQA document (Task 7) and environmental permitting (Task 8).

Assumptions:
 The City will coordinate site access.
 Protocol-level surveys for special-status plant and wildlife species are not included but can be provided via a contract modification.

Deliverables:
 Draft and revised biological resources report (electronic) 483
Section 8, Item B.
35 General
Task 5.2 - Wetland Delineation Report
ESCO will prepare a preliminary jurisdictional delineation report for the proposed project area. The wetland delineation will be prepared in accordance with the U.S. Army Corps of Engineers (USACE) 1987 Wetland Delineation Manual and the regional supplements for the Western Mountains, Valleys and Coast Region, and/or Arid West Region, whichever is most appropriate for the site location and conditions. ESCO will conduct a site visit to map wetlands and other waters of the U.S./state in the proposed project area. ESCO will prepare a draft report for review by the City. Following review, ESCO will revise and submit the wetland delineation to USACE with the CWA Section 404 application package as described in Task 8.

If requested by USACE, ESCO will organize and attend one field visit with USACE to review the wetland delineation findings. Based on feedback received from USACE, ESCO will revise the wetland delineation and submit the revised version to USACE. Under this scope of work, it is assumed that refinements to the wetland delineation would be minor and related to adjustments to report mapping or minor text edits.

Assumptions:
 Field visit with USACE to review wetland delineation, if requested Deliverables:
 Draft and revised wetland delineation report (electronic) Task 5.3 - Cultural Resources Survey and Report
The Native American Heritage Commission (NAHC) will be contacted to determine whether Native American sacred sites are known to be located in or near the project area and to request a list of Native American tribes that have a traditional and cultural affiliation with the project area. Note that the response from the NAHC can take 3-4 weeks. Upon receipt of the list from the NAHC, ESCO will send project notification letters to listed tribes and tribal contacts. ESCO will draft general outreach letters to solicit comments or concerns from NAHC-listed tribes, send them out on behalf of the City via email, and follow up by phone and/or email, as necessary. ESCO will participate in up to 2 hours of conference calls with the City and Native American tribes, if requested. As described in Public Resources Code Section 21080.3.1(b)(2), contacted tribes must respond to the project notification letters within 30 days. ESCO will also send request letters to relevant historical societies or other institutions to determine if any areas of historical concern have previously been documented. Responses from historical societies are generally received within 1 month.

A cultural resources field inventory of the APE (approximately 21 acres) based on the results of the record search conducted in Task 2. Archaeologists will examine the ground surface within the direct APE by walking closely spaced transects. Trowels or hoes may be used to clear vegetation and increase ground surface visibility, if needed. If deemed warranted by the field reconnaissance, minor subsurface probing using a shovel and trowel will be performed to gain a better understanding of the subsurface conditions. A ¼-inch screen may be used to further separate potential cultural items within the soil. Any identified archaeological resources will be recorded on the standard page of the California Department of Parks and Recreation (DPR) Form 523. These will include photographs and a site map, and global positioning system data will be collected to accurately delineate the locations of all resources. DPR record updates will be prepared for any resources within the APE that had been recorded previously. Recorded archaeological resources will not be evaluated for National Register of 484
Section 8, Item B.
36 General
Historic Places (NRHP) and California Register of Historical Resources (CRHR) eligibility under this scope of work. This scope assumes that, if potentially significant archaeological resources are identified on the project property, measures will be taken to avoid impacts so that there is no need to formally evaluate their significance.

The current WWTF was constructed in 1949; therefore, it is of sufficient age to require evaluation for NRHP and CRHR eligibility. An architectural historian will visit the project area to record the facility.

DPR forms will be prepared, which will include NRHP and CRHR eligibility evaluations. If available, the architectural historian will review as-built drawings or any other useful materials relating to the structures. The results of the evaluation will be incorporated into the draft Cultural Resources Assessment Report.

ESCO will prepare a draft Cultural Resources Assessment Report once the field inventory is completed. Due to the involvement of FEMA in this project, it is assumed that the project will also require review under Section 106 of the National Historic Preservation Act (Section 106), as well as CEQA. Therefore, the Cultural Resources Assessment Report will comply with the requirements of Section 106 and will be prepared according to the inventory requirements of the California Office of Historic Preservation. The report will include, at a minimum, a project description, project location, results of the records and literature searches, results of the field studies, a summary of findings (including a NRHP/CRHR eligibility recommendation for the current WWTF), and conclusions. The report will include mapping of archaeological site location data and survey coverage areas, as appropriate, and will identify built environment features.

A copy of the report will also be submitted to the NCIC.

Assumptions:
 Up to 20 Native American tribes and individuals will be contacted through tribal outreach.  There will be no field visits with Native American tribes.  The City will provide access to parcels 018-002-031 and 018-002-032 as well as the current WWTF facility for archaeological survey.
 The City will provide access to the project site so that the buildings may be photographed.

Access to pertinent records regarding construction of the WWTF will also be provided.  This scope assumes that no more than two archaeological resources will be recorded.  This scope of work does not include evaluation of archaeological resources for the NRHP/CRHR, should resources be present in the direct APE that cannot be avoided by project construction. This evaluation can be provided as an additional scope item.

Deliverables:
 Draft and revised cultural resources assessment report (electronic) Task 6 - Environmental Document
At the conclusion of Task 4, the City will determine the level of CEQA review for the project. This scope of work assumes that an IS/MND will be prepared. If a different determination is made, this scope of work and budget may require revision and augmentation.

Task 6.1 - Site Visit and Project Description
To initiate work on the project, ESCO’s project management team will visit the project site along with the City’s project leads. Based on the information collected during Phase I and the site visit, ESCO will 485
Section 8, Item B.
37 General
develop a project description for the CEQA evaluation. In conformance with CEQA Guidelines Section 15124, the project description will include a site location map, description of the proposed project and its goals, project features, construction methods, and long-term operations and maintenance. The project description will also include a list of responsible and/or trustee agencies with jurisdiction over the project, including local, state, and federal regulatory agencies. ESCO will submit the draft project description for review, revise it based on the comments received, and incorporate the final draft into the environmental document.

Assumptions:
 Once the project description has been finalized, any substantive changes to the proposed project may require an amendment to the work plan and budget based on work already completed that requires revision to reflect those changes.

Deliverables:
 Draft and revised project description (electronic)
Task 6.2 - Administrative Draft Initial Study
Once the project description is finalized, ESCO will prepare an IS. The IS is a preliminary analysis to identify the potential for the proposed project to result in significant environmental effects. Assuming that all impacts can be mitigated to a less-than-significant level, the IS will be combined with an MND.

However, if one or more environmental impacts are identified during preparation of the IS that have the potential to be significant, preparation of an EIR may be necessary. In that case, an amendment to the scope of work and cost estimate would be required.

Consistent with the requirements of CEQA Guidelines Section 15063, the IS will include: (1) the project description developed in Task 1; (2) a description of the environmental setting; (3) an evaluation of environmental impacts using the CEQA Guidelines Appendix G environmental checklist; (4) feasible mitigation measures that will reduce any significant impacts to a less-than-significant level, if possible; and (5) the names of individuals who prepared the IS.

Assumptions:
 If one or more environmental impacts are identified during preparation of the IS that have the potential to be significant, ESCO will notify the City immediately. If it is determined that preparation of an EIR is necessary, an amendment to the scope of work and cost estimate would be required.
 The City will provide one set of consolidated comments on the administrative draft IS with any discrepancies resolved.

Deliverables:
 Administrative draft IS (electronic)
Task 6.3 - Screen-check Draft IS/MND
Following receipt of the City’s comments, ESCO will conduct a conference call with the City to discuss comments and agree on revisions to the draft IS. Based on the conference call and comments received, the City will determine whether to continue forward with an IS/MND or whether an EIR may be necessary.
486
Section 8, Item B.
38 General
Assuming that an IS/MND is appropriate, ESCO will prepare a screen-check draft IS/MND and draft mitigation monitoring and reporting plan (MMRP), which will be incorporated as an appendix to the IS/MND.

ESCO will prepare a Notice of Intent (NOI), alerting the public to the availability of the draft IS/MND for review. In compliance with CEQA requirements, the NOI will contain a description of the project and location; identification of significant environmental impacts; dates of the public review period; addresses of locations where the draft IS/MND and supporting documents are available for review; and a statement of whether the project site is a listed toxic site. A draft and final NOI will be prepared for the City’s review and approval. This work plan assumes that the NOI will be posted on the City’s website and will not be distributed by mail. In addition, ESCO will prepare a newspaper notice based on the NOI for review by the City.

In accordance with CEQA Guidelines Section 15085, ESCO will prepare a Notice of Completion (NOC) for filing along with the IS/MND at the State Clearinghouse. The NOC will contain information describing the project (including location), physical and/or electronic locations where the draft IS/MND is available for public review, and the dates of the 30-day review period.

ESCO will submit an electronic copy of the screen-check draft IS/MND and notices to the City for review. ESCO will finalize the IS/MND and notices based on comments received from the City on the screen-check draft IS/MND. It is assumed that, at this stage, comments will be primarily related to minor editing and document layout and format.

As required by California law (Section 7405 of the California Government Code), the revised screencheck draft IS/MND will then be sent to Allyant, a nationally known accessibility contractor, to be remediated to meet California ADA requirements for file accessibility.

Assumptions:
 The City will provide one set of consolidated comments on the screen-check draft IS/MND with any discrepancies resolved.
 The cost for ADA remediation included in this proposal is an approximation only; the City will be provided a cost estimate from Allyant before submittal of files for remediation.  The City acknowledges that ESCO cannot control the schedule for remediation; therefore, scheduling of the public review period will be approximate.

Deliverables:
 Screen-check draft IS/MND (electronic)
 Draft MMRP
 Draft NOI, NOC, and newspaper notices
Task 6.4 - Public Draft IS/MND and Public Notices
ESCO will coordinate with a newspaper of general circulation to post the legal notice. ESCO will work with the City to coordinate permission to submit the IS/MND, NOC, and NOI to the State Clearinghouse and County Clerk and will coordinate filing to begin the 30-day public review period.

This work plan assumes that no public meeting will be held to gather public comments on the proposed project.

Assumptions:
487
Section 8, Item B.
39 General
 The City will provide one set of consolidated comments on the screen-check draft IS/MND with any discrepancies resolved.
 The cost for ADA remediation included in this proposal is an approximation only; the City will be provided a cost estimate from Allyant before submittal of files for remediation.  The City acknowledges that ESCO cannot control the schedule for remediation; therefore, scheduling of the public review period will be approximate.  The State Clearinghouse requires up to 3 days to officially post a document for public review; therefore, scheduling of the public review period will be approximate.  No public meeting will be held during the 30-day public review period.

Deliverables:
 Public draft IS/MND (electronic), NOI, and NOC posted to SCH  NOI provided to County Clerk’s office
 Newspaper notice published
Task 6.5 - Response to Comments Memorandum, MMRP, and Notice of Determination This task assumes that public comments do not result in substantial revision to the impacts or mitigation measures identified in the IS/MND, and that recirculation is not necessary. The level of effort for this task is assumed to address no more than 20 individual comments.

Following the close of the public comment period on the IS/MND, ESCO and the City will review the comments received. ESCO will conduct a conference call with the City to discuss the key comments received and determine the approach to response preparation. ESCO will then prepare a draft and final memorandum that briefly considers the comments received and provides responses for the City’s use in adopting the IS/MND.

In conformance with CEQA Guidelines Section 15132, ESCO will finalize the response-to-comments memo and MMRP for adoption. In addition, ESCO will be available to attend an approval hearing to present information about the CEQA process and the findings of the IS/MND and to answer questions from decision makers.

ESCO will prepare a Notice of Determination (NOD) conforming to CEQA Guidelines Section 15094.

The NOD will identify the project description, location, date of project approval, statement that the IS/MND was adopted, summary of the project’s significant effects, statement of whether mitigation measures were made, conditions of project approval, and the address where the IS/MND can be reviewed. Within 5 days of project approval, ESCO will file the NOD with the local county clerk/recorder and the State Clearinghouse. ESCO will pay county clerk processing fees ($50) and California Department of Fish and Wildlife filing fees (currently $2,968.75) to accompany delivery of the NOD to the State Clearinghouse.

Assumptions:
 This task assumes that public comments do not result in substantial revision to the impacts or mitigation measures identified in the IS/MND, and that recirculation is not necessary.  The level of effort for this task is assumed to address no more than 20 individual comments.

Deliverables:
 Administrative draft response-to-comments memo (electronic)  Final response-to-comments memo (electronic)
488
Section 8, Item B.
40 General
 Attendance at approval hearing
Task 7 - Environmental Permitting
Task 7.1 - Clean Water Act Section 404 – USACE
The project may require authorization from USACE under CWA Section 404 for fill and/or dredge within jurisdictional waters of the U.S. ESCO will evaluate whether the project may qualify under a Nationwide Permit (NWP). The application package will include:
 Cover letter to introduce the project;
 PCN form;
 Design Plans (provided by ESCO and the City); and
 Technical studies, including the biological conditions report (Task 5.1), wetland delineation report (Task 5.2), and cultural resources assessment (Task 5.3).

ESCO will prepare and submit a draft NWP application package to the City for review. ESCO will address one round of comments from the City and revise and submit the permit application package to USACE. This scope of work will include up to two conference calls with the City and USACE during the permit application process.

Task 7.2 - CWA Section 401 – RWQCB
The project will require authorization from the Central Valley RWQCB under CWA Section 401 for fill and/or dredge in waters of the state. ESCO will prepare the following permit application items:
 Cover letter to introduce the project;
 Application for Discharges of Dredged or Fill Material to Waters of the State (401 Certification), which is the standard permit application form for RWQCB permits;  Design Plans (provided by the City and ESCO);
 Technical studies, including the biological conditions report (Task 5.1) and wetland delineation report (Task 5.2);
 Revegetation Monitoring Plan, if needed; and
 CEQA compliance documentation (Task 6).

Before submitting the 401 Certification package to RWQCB, it is now a standard requirement that a Prefiling Meeting be requested. ESCO will prepare a 401 Certification Pre-filing Meeting request for submittal to RWQCB, which will determine whether the meeting will be held. If a meeting is held, ESCO will accompany the City.

The draft 401 Certification package will be submitted to the City for one round of review. ESCO will revise and submit the permit application package to RWQCB. This scope of work will include up to two conference calls with the City and RWQCB during the permit application process.

Supplemental information or data may be requested by RWQCB during the application review process.

ESCO will support the information response process with RWQCB, to the extent that remaining budget is available in this task once the permit application is developed and submitted.

Task 7.3 - California Fish & Game Code Section 1602 – CDFW ESCO will prepare a standard application for a Streambed Alteration Agreement (SAA) following the application format provided in the CDFW Environmental Permit Information Management System 489
Section 8, Item B.
41 General
(EPIMS) External Permitting Portal. ESCO will also prepare supplemental information, as needed, to support the application. ESCO will prepare and submit a draft version of the application and supplemental information for review by the City. ESCO will revise the application materials based on one round of comments and upload the material to the EPIMS portal. This scope of work will include one conference call with the City and CDFW SAA reviewers during the permit application process.

Task 7.4 - Regulatory Agency Coordination
Under this task, ESCO will support the City with additional regulatory agency coordination to track the permit review and approval process. The tracking and coordination process may include activities such as answering questions from regulatory staff on the application materials; providing project updates to the regulatory agencies; preparing memoranda to address regulatory requests for information; and participating in calls, meetings, and site tours with agency representatives.

The budget estimate for this task is based on our experience with similar projects. Actual costs will be dependent on the level of assistance requested by the City. ESCO will provide regulatory coordination services up to the level of effort shown in the cost estimate for this task.

Assumptions:
 If CDFW requests additional information for the application to be considered complete, ESCO will be available to revise and/or supplement the SAA application package within the available budget remaining in this task once the permit application has been developed and submitted.  If USACE determines that the project does not meet NWP requirements and elects to authorize the project under an alternative permitting pathway, such as a standard permit, then ESCO will discuss the permitting process with the City and an amendment to this scope of work may be required.
 This scope assumes that permanent impacts to waters and wetlands of the U.S./state would be less than 0.1 acre. If the project impacts would exceed this area, then authorization by USACE would be required to qualify for a NWP.
 It is assumed the project can be designed and constructed in a manner that avoids take of federally listed and/or state-listed species. If take of a listed species is unavoidable, an amendment to this scope of work may be required.
 The City will be the primary contact with regulatory agency staff throughout the permitting process. ESCO will provide support as remaining budget for Task 7 allows.  The cost estimate does not include permit submittal fees or annual permitting fees. Permit submittal fees will be paid by the City or can be added to the budget when known.  Surveys will be reconnaissance level and daytime events only; no protocol-level surveys will be conducted.

Task 8 - Administrative Record
ESCO will maintain all aspects of the administrative record as it relates to the development of various environmental documents for the duration of the contract. Entries to the administrative record will be collected from technical staff and incorporated into the administrative record. Throughout the project contract, ESCO will make the administrative record readily available to the City upon request.

The complete administrative record will be delivered to the City within 6 weeks following filing of the NOD.
490
Section 8, Item B.
42 General

NON-WASTEWATER TREATMENT FACILITY (WWTF) - IGA SCOPE OF WORK

1. SCOPE OF WORK
Scope of work includes a description of the Energy Conservation Measures (ECM), Energy Generation Measures (EGM) and/or Facility Improvement Measures (FIM) and is a preliminary look at different options that will be discussed with the Customer to identify priorities and finalize the Phase 1 scoping project.

ESCO will utilize city’s existing energy reports, such as “Distributed Energy Resource (DER) Recommendations Summary” dated March 17, 2025 for solar PV, battery storage and EV charging recommendations at the Auditorium, Community and Admin Building, and Miner’s Bend for purposes of potential project estimates and feasibility. ESCO will use report’s data for solar, battery and EV charging for Phase 1 non-wastewater sites, however, will do own analysis for solar and battery storage sizing at wastewater treatment plant.

Additional scope items to be evaluated include lighting and mechanical work at all (7) sites listed in the Facilities table in Section 3. ESCO will work with City to prioritize the oldest HVAC units and any remaining non-LED interior and exterior lighting.

Any scope items outside of solar, battery storage, EV charging, lighting and mechanical will fall into Phase 2 after determination of Wastewater Treatment Plant Upgrades scope and financials, for evaluation by ESCO. Examples include: streetlighting, irrigation, building automation, and other energy and water savings measures. During Phase 2, ESCO will also perform due diligence regarding existing energy report data and assumptions as they advance to Phase 2.

2. PHASES OF DESIGN
The Design Scope of Work shall consist of one phase: Conceptual Development (Up to 30% Design Scoping Meeting).

Phase 1: Conceptual Development (Project Scoping)
At the Phase 1 final meeting, ESCO shall demonstrate for Customer whether recommended improvement measures are viable and whether financial benefits (including grants) can be derived by their implementation in an amount sufficient to cover costs associated with the Project.

Scope of work includes a description of the Energy Conservation Measures (ECM), Energy Generation Measures (EGM) and/or Facility Improvement Measures (FIM), a clear understanding of grant criteria and estimated probability of securing grants, calculation of energy and operational savings, and preliminary costs for the construction of the scope.

Phase 2: Final Design Development
During Phase 2, ESCO will use final scope determination from Phase 1 to put together a firm fixed price for all non-waste water scope, including all due diligence to finalize design documents as well as costs and savings for each ECM.

Phase 2 will include: Final scope of work, final fixed firm pricing, financial pro-forma, guaranteed annual energy savings and M&V plan, commissioning plan, operations & maintenance plan, training plan and final drawings and equipment specifications.
491
Section 8, Item B.
43 General

3. FACILITIES INCLUDED
The Design Services will be performed in the following Customer facilities. Any additional facilities to be added in the future must be by mutual agreement between Customer and ESCO:

Facilities
Building Name Address Square Footage Year Built
Auditorium 18 Main St, Sutter Creek, CA 95642 5,040 1928 Community Building 33 Church St, Sutter Creek, CA 95642 3,370 2005 Administrative Building 35 Church St, Sutter Creek, CA 95642 1,155 1880 Historic Grammar School 111 Cole St, Sutter Creek, CA 95642 6,000 1856 Monteverde Store 11 Randolph St, Sutter Creek, CA 95642 1,600 1896 WWTP 340 Mahoney Mill Rd, Sutter Creek, Ca 95642 - -
Miner’s Bend Park 29 Old Rte 49, Sutter Creek, CA 95685 - -

4. RESPONSIBILITIES
Customer Will:

Customer will:

1. Provide ESCO with all such access, knowledge and history as may be relevant to ESCO’s analysis and/or design, including, without limitation:
a. access to Customer’s Facilities, systems and equipment, including remote network access, as necessary or appropriate to facilitate ESCO’s analysis and design (i.e. enabling ESCO to take equipment inventory, determine operating schedules, evaluate known operational deficiencies, perform an energy efficiency analysis, measure actual energy use, etc.);
b. access to key personnel to discuss operating requirements, maintenance practices, and other information relevant to ESCO’s analysis;
c. information relating to any and all known or suspected deficiencies, defects and malfunctions of or affecting the Facilities, systems, equipment and components thereof; d. information relating to any site conditions that should be considered in planning and executing the construction services;
e. twenty-six (26) months of electric, gas, and water data, including utility billings on meters for all premises owned by Customer; and
f. access to copies or loans of such documentation as may be relevant to ESCO’s analysis, including, as applicable and without limitation, Facility plans, equipment lists, and/or other utility invoices.
492
Section 8, Item B.
44 General

2. Meet with ESCO to establish Project criteria and make Project decisions in a timely manner.

3. Promptly inform ESCO if at any point Customer becomes aware of any portions of scope that will not be included or funding that will not be available for final Project implementation.

ESCO Will:

ESCO will:

1. Compile information reasonably requested by Customer for purposes of any grant applications being submitted by the Customer in connection with the Project.

2. Conduct a Project programming meeting, Facility walk-through(s) and personnel interview(s) to gain an understanding of Facility operations, concerns, needs, and desired performance criteria.

3. Work with Customer to refine performance requirements, financial criteria, and Project scope.

4. Provide Customer an energy, revenue, and cost savings analysis demonstrating the simple ROI effect of project finances and operations.

5. Provide Customer with a Scoping Proposal setting forth the following:
a. Proposed Scope of Work for Phase 2
b. Proposed Preliminary Schedule for Phase 2 Development and Phase 3 Construction c. Preliminary Project Estimate for Phase 3 Construction

PROJECT FUNDING SUPPORT
ESCO will assist the City in identifying and understanding available grants and incentive programs, including their eligibility requirements, timelines, and qualification criteria. ESCO will also provide support throughout the application process for these incentives and contribute to the grant writing efforts.

In addition, ESCO will collaborate with the City and its designated financial advisor or manager to coordinate and pursue funding opportunities, including loan applications from potential private and public financial institutions.
493
Section 8, Item B.

City of Sutter Creek
City Treasurer's Report
Receipts & Disbursements Report
City's Checking Account
Receipts
Deposits $ 415,874
Reversal of Bank Charges -
Total $ 415,874
Disbursements
Accounts Payable $ 714,331
Payroll & Benefits 138,864
Bank Charges 45
Total $ 853,240
Net Amount of Investment Transfers $ -
Recap of City Treasury
Investments on Hand August 31, 2025
Rate of
Return
Bank of Marin Checking $ 1,224,418 0.01%
Bank of Marin Money Market $ 12,222 4.34%
Bank of Marin Money Market #2 $ 2,002,853 434.00%
* California State Treasurer's LAIF $ 1,754,691 4.40%
Total $ 4,994,184
Total this month last year $ 4,442,042
* LAIF 1 $ 64,519
LAIF 2 $ 1,690,172
The investment information provided in this report reflects the City's ability to meet expenditure requirements for the next six months. The investment portfolio is in compliance with the City's investment policy. Victoria Runquist 9/5/2025 August 2025
Market or
Withdrawal
Value
494
Section 13, Item A.
18 Main St., Sutter Creek, CA 95685 • Telephone: (209)267-5647 • Fax: (209)267-1655 • TTY: 711 The City of Sutter Creek is an equal opportunity service provider and employer _____________________________________________________________________________

STAFF REPORT
TO: TOM DUBOIS, CITY MANAGER
MEETING DATE: SEPTEMBER 15, 2025
FROM: AARON WOLCOTT, CITY CLERK
SUBJECT: CITY CLERK REPORT – AUGUST 2025
RECOMMENDATION:

Information only.

BACKGROUND:

August continued as a slower month for the City Clerk with only one City Council meeting. I was able to complete work on an updated record retention schedule and also spent time exploring options for an updated website. Additionally, I organized a staff breakfast which was held at the Grammar School.

The below items represent the key functions of the role and activities completed in the month of August.

DISCUSSION:
 City Clerk:
o Agendas and minutes created for 1 City Council meeting and 1 Design Review Committee meeting.
o 2 Public Record Requests. Both were for police records. This adds additional administrative burden on the Police Department
o 3 City Council Resolutions
o Permits: 2 Event Permits, 4 Encroachment Permits
o Record Retention: A new Record Retention schedule was completed. I have identified gaps in our minutes from 2006-2011 and so far have not found any backup of these files. o Website: I held multiple calls with CivicPlus to discuss changes to our website. I am hopeful that we can get a better look to our site and also better functionality for editing and managing our content going forward.
 Risk Management
o We have one pending historical Workers Compensation claim that is being worked on. This claim has been slow going as the staff member seeks appropriate treatment. o A presentation on our RMA was given to Council. Council members can contact myself or Mason for additional information as needed.
 Human Resources
o I attended the JPA meeting for our health insurance. New rates were voted on and the new rate is going to 9.85% higher than last year for premiums. 495
Section 13, Item B.

Monthly Report
August 2025
18 Main Street, Sutter Creek, CA 95685 - Phone: (209) 267-5646 - Fax: (209) 267-1655 The City of Sutter Creek is an equal opportunity Employer and Service Provider.

To: Tom DuBois, City Manager
From: Jim O’Connell, Chief of Police
Date: September 15, 2025
Re: August 2025 Staff Report
August 2025 Department Statistics
Calls For Service 104 -14
Traffic Stops 99 +30
Officer Initiated Incidents 378 +105
Business Checks 279 +124
Vehicle/Pedestrian Checks 6 -4
Total Officer Reports 30 +7
Arrests 11 -3
Moving Citations 3 -5
Parking Citations 1 +1
TOTAL 911 +240
104
Calls For Service
99 Traffic Stops
11 Arrests
30 Officer Reports
Volunteer Contributions:

During the month of July, our dedicated volunteers provided 18 hours of service to the community.

Community Engagement:

SCPD Officers continue to conduct regular foot patrol downtown on each of their respective shifts.

Officers also spend regular time on our school campuses. 496
Section 13, Item C.
1 Staff Report
To: Tom DuBois, City Manager
Meeting Date: September 15, 2025
From: Frank Whitmore, PE City Engineer
Subject: Project Status Update
Type: Project Status Memo
Tom, the following is a status update of all projects WGA is currently working on:

1. Building Inspections/Plan Check – Continuing building inspections on Tuesdays and Thursdays or as needed. Building plan check is being performed on a continual basis as plans are submitted. For August 2025:
5 Plan checks were completed
29 Inspections were completed

2. Encroachment Permit Review – Encroachment permits are reviewed as needed when requested by the City’s Account Clerk, Holly Boehme. For August 2025:
1 Permit reviews were completed
0 Inspections were completed
A. CVIN – The proposed encroachment permit plans for CVIN Fiberoptic Facilities through town have been reviewed by City Staff and awaiting further information (i.e. insurance, performance bond, fees, etc.) from the applicant prior to issuance of the encroachment permit.

3. Code Enforcement
A. 30 Ridge Road – Owner has provided documentation to support eviction process and letter stating he will follow through with eviction proceedings or remove nuisance. Tank Replacement Plans for State required upgrades have been plan checked by city staff. City is currently waiting for updated plans with plan check comments addressed.
497
Section 13, Item D.
2 B. 300 Hanford Street – Awaiting Mr. Navarro to provide a complete application and plans for a Use Permit. Currently scheduled to meet with Mr. Navarro on 9/9/2025 for a site visit to confirm that there are no hazardous chemicals stored on site. Spoke with Michelle Gallaher at Amador County Code Enforcement and she confirmed Mr. Navarro has had a contract with Amador County for over ten years. The County has a separate contract for hazardous material removal and that contractor removes all liquids from vehicles and Mr. Navarro only removes the debris.

C. Eureka Mine Site – Planner and/or City Manager would need to provide update on this. No action by code enforcement currently. WGA drove by the site on Wednesday 8/27/2025 after a meeting in Amador City at 8:00 P.M. and did not observe people in the RV’s from Ridge Road and Sweet Pea Way. Also, drove by the site on Tuesday 9/2/2025 at 10:30 P.M. when returning from Sacramento Airport and observed the same thing.

D. Vehicles – 93 Badger Street. Met with occupant and discussed dodge truck. The truck is currently registered and recently had its mechanical issues repaired. The occupant will now be making dump runs to dispose of household waste. Code enforcement is following up with occupant on 9/9/2025.

4. Bryson Park Expansion Project – 95% plans and specifications have been sent to Public Works for review and comment. Once comments have been received, WGA will incorporate public works comments and complete project plans/specifications for a complete bid package.

5. City Standards Update – WGA is working with Public Works, City Manager and City Attorney to update the City’s Improvement Standards and Municipal Code to adopt a pavement moratorium to protect the City’s paving/resurfacing investments. The moratorium will help preserve the integrity, appearance, and ride quality of the new pavement, which will extend its lifespan and delay the need for costly repairs.
498
Section 13, Item D.

Page 1 of 8 ends

STAFF REPORT
TO: TOM DUBOIS, CITY MANAGER
MEETING DATE: SEPTEMBER 15, 2025
FROM: DAN LAFONTAINE, PUBLIC WORKS DIRECTOR
SUBJECT PUBLIC WORKS DEPARTMENT REPORT FOR AUGUST 2025
Objective: The objective of this staff report is to provide a monthly status update regarding activities within the Public Works Department.

Executive Summary: August has come and gone, and we are in the middle of some very large projects. The largest project affecting residents is the Miscellaneous Sewer Main Replacement Project and we are happy to report that the project is over 75% completed. This project will wrap up by the end of September and the City appreciates all the patience with the road closures. We also began work on the Henderson Underdrain Project at the face of the Henderson Reservoir. Our first big problem was dealing with the amount of existing sludge, which proved a much bigger problem than anticipated. Campbell construction has mitigated the sludge, +and the project is moving forward. We completed some more vegetation clearing along old Hwy 49 and are far ahead of schedule this year thanks to the availability of the Cal Fire crews. We received approval from the council and the Measure P oversight committee to pave the other half of Broadway. This work should be completed by the end of the year through AWA. See more details of the major projects below:

The Miscellaneous Sewer Main Replacement Project – Work continues on the 2025 collection system projects as we finish up the largest section of work putting the project over 75% complete.

As of September 5, 2025, the contractor has finished Areas A (Napa Auto Parts – Installed one manhole), Area B (Raylan Drive - Installed two new manholes and 160 feet of open cut), Area C (Dennis Street - Installing one new cleanout and 400 feet of pipe bursting), Area E (Old Highway 49 – Highland Drive to Old Sutter Hill Road) and Area F (Greenstone Terrace - Installed one new cleanout, two new manholes and 30 feet of open cut, and approximately 800 feet of pipe bursting) and is finishing up on Area G (Eureka Street at Broad Street – Installing one cleanout and 160 feet of pipe bursting).

The crew is currently working on Area D (Sutter Hotel/Fiefield Alley – Installing one manhole and 215 feet of pipe bursting) which will be our most difficult access area of the project.

Fiefield will most likely be closed (due to the limited width of the road) .

ARSA Henderson Underdrain Project – The Henderson reservoir is empty, and construction prep is underway as of August 18, 2025. A temporary rip-rap wall has been erected along the front of the 499
Section 13, Item E.

Page 2 of 8 ends

entrance to the vault in front of the underdrain pipe. The initial cleaning and video inspection of the pipe has been completed. It was discovered that the underdrain pipe, although deteriorating, is encased in concrete. Based on this new evidence, the contractor has proposed to remove what remains of the pipe and replace by cure in place pipe (CIPP) vs slip lining. The new design has been sent to DSOD and we are currently waiting for approval to proceed. Water is being supplied to the troughs by water trucks and the pump around when viable.

Wastewater Treatment Request for Proposals – The City is working with Schnieder Electric to finalize the scope of work and sign a contract.

Upcoming: Miscellaneous Sewer Main Replacement Project – After Area D and G the project will be complete, and the City will do a final punch list of items for closeout. The project will be completed around the beginning of October.

Wastewater Treatment Plant – An update is being presented to the council tonight ARSA Henderson Underdrain – Construction will continue as soon as DSOD approval is granted. 500
Section 13, Item E.

Page 3 of 8 ends

Detailed Summary: Below is a detailed summary and/or status of the main PW responsibilities; Collection System, Wastewater Treatment Plant, Effluent Disposal, Streets and City Right of Way, Parks and Buildings, and Service Callouts.

Collection System Status:

CIP work
 Miscellaneous Sewer main Replacement Projects. – Work continues on the 2025 collection system projects as we finish up the largest section of work putting the project over 75% complete. As of September 5, 2025, the contractor has finished Areas A (Napa Auto Parts – Installed one manhole), Area B (Raylan Drive - Installed two new manholes and 160 feet of open cut), Area C (Dennis Street - Installing one new cleanout and 400 feet of pipe bursting), Area E (Old Highway 49 – Highland Drive to Old Sutter Hill Road) and Area F (Greenstone Terrace - Installed one new cleanout, two new manholes and 30 feet of open cut, and approximately 800 feet of pipe bursting). The work on Area B and Area E had many obstacles to overcome. We encountered gas lines that were installed right next to our sewer lines, concrete encased pipe across old Hwy 49, and a multitude of paving issues that had to be addressed. We also encountered an old storm drain that was well past its lifespan that needed to be replaced. See below:

Additional paving had to be completed to return the road to drivable conditions. The crew is finishing up on Area G (Eureka Street at Broad Street – Installing one cleanout and 160 feet of pipe bursting) with some landscaping left to restore the area. The crew is currently working on Area D (Sutter Hotel/Fiefield Alley – Installing one manhole and 215 feet of pipe bursting), which will be our most difficult access area of the project. 501
Section 13, Item E.

Page 4 of 8 ends

 Upcoming Miscellaneous Sewer Main Replacement Projects – After Area D and G the project will be complete, and the City will do a final punch list of items for closeout.  RH Borden presented the results of the collection system flow meters from the sewer manholes in March. Generally, the results show that infiltration is occurring in four of the basins located downtown in varying degrees. The assessment also found some manholes that have signs of degradation (not properly sealed from groundwater). With the spill in the creek last month and pending repairs, staff is putting together a targeted list of items to investigate/repair further for next year’s collection system repairs. This list will be presented to council by the end of October and finalized before the end of the year.  The City excavation on Eureka St to replace 120 feet of pipe and install a cleanout halfway down Eureka St. was postponed as priorities shifted to identifying deficiencies in the leak detection areas for the upcoming AWA construction. This work will be accomplished before the rainy season.

SSMP Activity
Calls for service.
 9/1/25; Pump station failure. The primary pump failed in the pump station resulting in a backup into the emergency vault. The emergency contractor was called to pump 3 truckloads (approximately 10K gallons) from the vault. A spare pump was installed on September 3, 2025. A replacement pump has been ordered.

Sewer System Cleaning and Maintenance.
 Last month reported an error in footage cleaned as 0 feet. The correct totals are, In July 2025 there was 4,437 Lineal feet and in August 2025, there was 100 Lineal feet of pipe cleaned. The total amount cleaned for the calendar year 2025 is 8,374 ft. The total cleaned for the calendar year 2024 is 19,207 feet.

Wastewater Treatment Plant Status:

The WWTP met all the effluent quality discharge requirements for the month of August 2025.

Table 1. Monthly Status of required reporting constituents.

Constituent Monthly Results Monthly Limits
Monthly Influent Flow 9.577 MG 0.315 MGD daily avg 0.48 mgd1 Effluent BOD, mg/L 19 mg/L 30 mg/l
Effluent Settleable Matter, mL/L < 0.1 ml/L 0.5 ml/l
Effluent TSS, mg/L 8.2 mg/L 30 mg/l
Total Coliform, MPN < 1.8 MPN 23 MPN
Sludge Wasted 46,349 gallons
Rain 0.00 in. 24.15 in. YTD –27.52” Last YTD
1 The 0.48 MGD is daily dry weather flow (May through October).

Plant Compliance Issues: The monthly July 2025 report was electronically submitted to the Regional Water Quality Control Board.

Operational Strategy Modifications:
 The rag bin was hauled on August 20, 2025.
 We continued normal sludge wasting in August with 46K gallons dewatered. 502
Section 13, Item E.

Page 5 of 8 ends

 The Aerator has been shipped back to the manufacturer to receive a new power section.
 The second Chlorine tank has been installed and piping connected in the chlorine building. The chlorine line was clogged causing some restrictions in the line. Upon clearing the line, we discovered that the pumps were still running hotter than the old pumps (136° vs 82°). We are talking with the field representative and waiting for correspondence back form the manufacturer.

Wastewater RFP updates – In August the City has been working with Schneider to come to terms on a contract for the new treatment plant. The contract is expected to be brought to council on the second meeting of September.

Effluent Disposal
 Bowers and irrigation resumed for the irrigation season on May 27, 2025. Ione has started receiving ARSA water on June 6, 2025, for the disposal season. On August 26, 2025, Ione stopped receiving water from ARSA. As of August 31, 2025, Ione has received approximately 250 acre-feet of ARSA water.
 Henderson Underdrain – The underdrain project commenced on August 18, 2025. A rip-rap wall was installed in front of the valve vault to keep the sludge away from the work area. The initial camera inspection of the underdrain pipe was completed on August 26, 2025. The initial investigation revealed that the underdrain pipe is deteriorating and is believed to be encased in concrete the entire length of the pipe. The contractor has proposed to change the new pipe installation method to cure in place pipe vs slip lining.

This will save the project time as CIPP is much faster to install. Design drawings of the proposed change are being developed and will be submitted to DSOD upon completion along with the initial camera inspection.

503
Section 13, Item E.

Page 6 of 8 ends

 On September 2, 2025, The waterman valve tech arrived onsite to inspect the valve. The technician indicated that the valve looked in great condition and just needs to be filed adjusted. A spare gasket was purchased to install prior to field adjustment. The majority of the problem with the valve lies in the alignment of the elongated valve stem. When the pier is reinforced the valve stem will be plumed up to help the valve travel. See pictures of the existing pier hardware below (note that this will be changed out when we retrofit the pier)
 The manufacturer of the flow meter for Bowers has proposed a shorter spool length with a restocking cost of 2K. City staff reviewed using the existing flow meter at the Preston 504
Section 13, Item E.

Page 7 of 8 ends

Forebay but due to the size of the existing pipe the flow meter would not be feasible in that section of the pipe. The City has elected to pay the restocking fee and once an RMA has been received the existing flow meter will be returned to the manufacturer.  The joint water balance was submitted on August 8, 2025. The technical memo concludes that both the City of Ione WWTF and the Combined System indicated there will be excess effluent volume from both system’s respective water balance calculations.  Ongoing maintenance of the cattle water troughs along the pipeline are occurring during the underdrain project. Irrigation sprinklers and valves were being repaired constantly (only at Bowers irrigation).
 Weed and rodent abatement at the three reservoirs.
 Send weekly updates to the Regional Board on reservoir levels and volumes.  Daily flow checks and level readings.

Streets and City Right of Way.
 The City has sent drawings and cost estimates to AWA for the additional work (approved by the council) to replace the storm drain line, install 2 new DI’s and pave the other half of Broadway. AWA will work with the contractor and the City to get this newly approved work completed. The City has issued an encroachment permit for the work and expects the work to be completed by the end of October. Per the grant, all work must be completed by the end of the calendar year.
 The City has received bids to fix the gutter on David drive and is waiting for the contractor to find time in the schedule to begin this repair. We hope to have this repair done before the rainy season.
 August 28, 2025 – City Staff removed a tree limb on Sutter Hills Rd that was blocking the stop sign.
 On August 12, 2025 – City Staff patched a section of asphalt in front of 67 Woodworth Street that had become broken up by the water meter.
 On September 4, 2025 – City employees ground down a concrete tripping hazard that was caused by our previous grinding that left an unintentional lip on the concrete.

 In August, City crews cleared the triangle on Sutter Ione Rd and Spanish Street 505
Section 13, Item E.

Page 8 of 8 ends

Parks and Buildings
 The CalFire crews have had a few days of availability to help with fuel mitigation in Sutter Creek in August. We took advantage of the road closure on Old Hwy 49 and had crews clear both sides of the road along with some of the “Big ditch” along Lorinda Dr. for a few days. The crew also got out to ARSA to do some brush work at Preston. Crews were scheduled to perform cleaning on Bryson but were called away to fight fires in the area. We will most likely not see the crews again until after the fire season. We are grateful to all the assistance they provide and made some real headway this year.

 Bryson Bathroom – WGA has finalized the plans for the new bathroom and has sent them to the City to review. After the City review, the work will be sent out for bid. 506
Section 13, Item E.

Page 1 of 1 ends

TO: TOM DUBOIS, CITY MANAGER
MEETING DATE: SEPTEMBER 15, 2025
FROM: ERIN VENTURA, CONTRACT PLANNER
SUBJECT PLANNING DEPARTMENT REPORT FOR AUGUST 2025
Executive Summary
Planning Commission was cancelled due to lack of agenda items.

The Following items were reviewed at the August 11, 2025 DRC meeting:
- 110 Gold Dust Trail- New SFR- approved with conditions - 40 Gold Dust Trail- remodel of church- approved with conditions Detailed Summary
Additional Projects:
 Impact Fee Study: The City is revising its LEAP Grant application to secure additional funding. A consultant is updating the Nexus Study.
 Zoning Code Cleanup: The City is utilizing remaining LEAP funds to clarify and update the zoning code. This project is currently in progress.  Staff is working on revising the ADU ordinance incompliance with State Law.  Panner Creek: Staff continues to work with the applicant regarding the creek crossing.

County Staff has reviewed the proposed creek crossing.
 130 Lincoln Ave (Cell towner) is close to receiving a building permit  DANCO has initiated a preliminary review of their building plans.  Crest View 3 and 4: Property owners rep is inquiring about how to reinitiate the project. 507
Section 13, Item F.
18 Main St., Sutter Creek, CA 95685 • Telephone: (209)267-5647 • Fax: (209)267-1655 • TTY: 711 The City of Sutter Creek is an equal opportunity service provider and employer ______________________________________________________________________________

STAFF REPORT
TO: THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL MEETING DATE: SEP 15, 2025
FROM: TAYLERED MARKETING
SUBJECT: AUGUST 2025 SOCIAL MEDIA DATA ANALYSIS
Social Media Analysis: City of Sutter Creek
(Period: August 2025)
Instagram Performance
Quantitative Highlights
● 22,394 views in August (↑ 41% from July).
● Followers vs Non-followers reached: 50.2% followers / 49.8% non-followers → strong discovery potential.
● Content type performance:
○ Posts = 59.3% of views
○ Reels = 29.7%
○ Stories = 11%
● Top posts:
○ Aug 13 (Sutter Creek Fireman’s Ball Promotion) → 4.3K views ○ Aug 5 (National Night Out) → 2.5K views
○ Aug 8 (Ragtime Festival promo) → 1.6K views
● Engagement: 837 total interactions
○ Likes: 356
○ Comments: 7
○ Shares: 66
○ Saves: 8
● Follower Growth: +15.3% vs July (452 followers total). ● Audience demographics:
○ Gender: 81.6% women / 18.4% men.
○ Age: majority between 35–64 (67%).
○ Top cities: Sutter Creek (19.8%), Jackson (11.3%), Pine Grove (9.3%), Ione (5.3%). 508
Section 13, Item G.
2 [Type text]
Qualitative Insights
● Visual storytelling works: Fire Dept., PD, and historic-themed posts performed best → audiences resonate with people + community pride.
● Event promotion effective: Ragtime Festival content had consistent traction. ● Limited conversation: Very few comments show that people watch but don’t talk back. ● Demographic skew: Female-heavy audience suggests messaging may lean toward community, family, arts, and lifestyle.

Facebook Performance
Quantitative Highlights
● Publishing activity (last 28 days): 78 posts
○ 55 Stories
○ 13 Photos
○ 10 Other (Reels, Videos, etc.)
● Top performing content:
○ Grand opening celebration (Photo) → 5,660 views
○ Staff Spotlight (Video) → 5,223 views
○ Fireman’s Ball. invite (Reel) → 2,244 views
● Followers: 2,241 total (+1% vs previous 28 days, +27 net followers). ● Audience demographics:
○ Gender: 73% women / 27% men
○ Age: majority 55+ (65+ = 32.3%, 55–64 = 24.7%)
○ Locations: Sutter Creek (11.7%), Jackson (6.9%), Pine Grove (3.8%), Ione (3.7%).
● Net follows by content type:
○ Videos → 61.5% of growth
○ Reels → 38.5%
Qualitative Insights
● Video & spotlight content drive reach: People enjoy personal stories (staff, community highlights).
● Older demographic on FB: More than half the audience is 55+ → reflects local residents more than tourists.
● Event info is valuable: Road closure posts still pulled &gt;1,500 views → practical updates matter.
● Consistency is high: 78 posts shows effort, but Stories dominate (which disappear quickly).

Successes Across Both Platforms
Strong reach & visibility — IG discovery is high; FB serves locals effectively.

Community pride content resonates — Fire Dept., PD, and staff features are top-performing.

Event promotion is working — Ragtime Festival posts consistently drew views and engagement.

Steady follower growth — modest but consistent on both platforms.

Areas for Improvement
Low interaction rates: Comments, shares, and saves are underperforming relative to views.

Content balance: FB relies heavily on Stories; IG has fewer Reels than optimal for discovery.

Younger audiences underrepresented: Only ~15% under age 35 across both platforms. 509
Section 13, Item G.
18 Main St., Sutter Creek, CA 95685 • Telephone: (209)267-5647 • Fax: (209)267-1655 • TTY: 711 The City of Sutter Creek is an equal opportunity service provider and employer Calls-to-action (CTAs): Few posts prompt engagement beyond viewing.

Recommendations
On Social Media

1. Interactive Content:
○ Add polls, Q&amp;A, or “vote on your favorite” posts to Stories. ○ Use “comment with your…” CTAs (favorite Sutter Creek event, photo memories, etc.).

2. More Reels (IG + FB cross-post):
○ Behind-the-scenes of city events, quick updates, local “day in the life” clips. ○ Reels will boost discovery with non-followers.

3. Community Spotlights:
○ Continue staff highlights → expand to volunteers, business owners, longtime residents.
○ Encourages shares among featured individuals’ networks.

4. Content Mix:
○ IG → more event reels and lifestyle visuals.
○ FB → fewer Stories, more permanent videos + shareable graphics (e.g., road closures, city alerts).

5. Strengthen Engagement CTAs:
○ End posts with clear prompts (“Share this with a neighbor,” “Tell us your favorite memory,” “Tag a friend”).

Overall, the City of Sutter Creek’s social presence is growing steadily and serving as a strong tool for visibility. With more emphasis on engagement, interactivity, and Reels, the city can expand reach to younger demographics while maintaining strong connections with its core local audience. 510
Section 13, Item G.
18 Main St., Sutter Creek, CA 95685 • Telephone: (209)267-5647 • Fax: (209)267-1655 • TTY: 711 The City of Sutter Creek is an equal opportunity service provider and employer ____________________________________________________________________________ TO: TOM DUBOIS, CITY MANAGER
MEETING DATE: SEPTEMBER 15, 2025
FROM: MASON PETERS, FINANCE SUPERVISOR
SUBJECT: FINANCE DEPT. AUGUST 2025 REPORT

CITY HALL/FINANCE DEPARTMENT UPDATE
 Sewer billing process is working as we had hoped for, but due to the loss of all autopay customers, we continue to not charge late fees as residents set up their autopay service again. We did not want this transition to impact customers in a negative way and we continue to mitigate those impacts as we can. We have a lot of enrollment coming through and it is taking quite a bit of time, but we are happy to see people are paying attention and are asking questions.
 We finished the payroll setup in Tyler Technologies’ ERP Pro 10 and we ran both payrolls in the new system this month, and it all went smoothly. We are incorporating some new processes as a result of this transition so I am learning and adapting as we go, but so far things are working well.
 We had a test run for digital timesheet submittals in the 2nd payroll run of August, and the testing went well. We learned some things from the testing and made changes, while most other things worked as intended. We will be fully rolling out the online timesheet submittal process in September, I will give an update on how that goes.  The online sewer payment website is gaining more use as residents are becoming increasingly aware of our billing system transition. The eCheck option is still in the works, and will hopefully be rolled out in September.
 Tom and I met with the CDTFA and went over how to review Measure P reports that they send over to us, and the data we receive is very thorough and detailed. I will be bringing a Q1 update in October that will go into more detail about performance based on budget, but for FY25, we received much more revenue than we had originally budgeted for. Keep in mind, we only anticipated to receive Measure P funds starting in April 2025, so we only saw activity for Q4 of last fiscal year.
511
Section 13, Item H.
2 ACCOUNTS PAYABLE ACTIVITY
In August 2025, 45 warrants were issued, totaling $660,287.69. For comparison, in August 2024, all warrants totaled $656,998.37. The major items this month in Accounts Payable included a progress payment for the Misc Sewer Collection System repairs to Soracco and our annual property & general liability insurance premium payment through Central San Joaquin Valley Risk Management Authority. We also paid our first quarter of worker’s compensation insurance premiums to CSJVRMA as well.

ACCOUNTS RECEIVABLE ACTIVITY
In August 2025, we received:
 Transient Occupancy Tax (TOT):
o In August 2025, we have received $27,887.31 for July short term rentals. For comparison, in August 2024, we received $27,930.74.
 Building Permits:
o In August 2025, we issued 9 building permits, totaling $7,210.81. Compared to August 2024, we issued 11 permits and total revenue generated at that time was $7,716.60. We saw a lot of reroof projects as well as a pool project.  Sewer Billing
o Auto Pay Customers
 Customers are still coming into City Hall or calling in asking for assistance with enrolling in auto pay, we have had a lot of progress getting folks re-established. Once eCheck is set up on the bill pay website we will have another large influx of autopay cus
o E-Bill Customers
 Current month: 215
 Prior Month: 211 (+4)
 Facility Rentals
o In August 2025, we had the following:
 1 renter in the Auditorium, totaling $2,285
 We have a renter for the Auditorium that has been consistently hosting Jazzercise classes for many years and they are not reflected in these figures. I want these notes to reflect unique rental activity rather than regular classes
 3 renters in the Community Center, totaling $1,830
 1 renter in the Historic Grammar School, totaling $125  We have 3 renters in the Grammar School that have been longterm renters that host classes for yoga and dance. They are not included in these figures since they are always renting rooms in the Grammar School and are very consistent, and I want these notes to reflect unique rental activity rather than regular classes 512
Section 13, Item H.
9/10/2025 12:13:07 PM Page 1 of 16
Detail vs Budget Report
Account Summary
Date Range: 08/01/2025 - 08/31/2025
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001 - GeneralFund
Department: 000 - NonDepartmental
001-000-40061 PERSUnfunded-NonDepartment 303,211.00 302,744.00 0.00 302,744.00 467.00 0.15% 001-000-70000 SecuredPropertytaxes -725,000.00 0.00 0.00 0.00 -725,000.00 -100.00% 001-000-70001 UnsecuredPropertytaxes -15,000.00 0.00 0.00 0.00 -15,000.00 -100.00% 001-000-70002 PropTax-CurrSupple(Co -17,000.00 0.00 0.00 0.00 -17,000.00 -100.00% 001-000-70003 PropertyTaxinLieuofM -326,000.00 0.00 0.00 0.00 -326,000.00 -100.00% 001-000-70008 DELINQUENTSUPPLEMENTAL -2,100.00 0.00 0.00 0.00 -2,100.00 -100.00% 001-000-70100 UtilityUserstax 0.00 -83.44 -90.73 -174.17 174.17 0.00% 001-000-70300 TransientLodgingTaxes -316,854.00 -22,722.59 -27,938.28 -50,660.87 -266,193.13 -84.01% 001-000-70400 Tax-Gen'lRetailSales -484,654.00 -44,574.78 0.00 -44,574.78 -440,079.22 -90.80% 001-000-70410 SalesTax-PublicSafety -16,000.00 -1,055.35 -1,351.42 -2,406.77 -13,593.23 -84.96% 001-000-70420 Measure P Sales Tax -484,654.00 -34,710.51 0.00 -34,710.51 -449,943.49 -92.84% 001-000-71000 Tax,Franchise-Republic Waste -69,987.00 -5,981.85 -11,480.34 -17,462.19 -52,524.81 -75.05% 001-000-71100 Tax,Franchise-Comcast -27,000.00 0.00 0.00 0.00 -27,000.00 -100.00% 001-000-71200 Tax,Franchise-PG&E -68,000.00 0.00 0.00 0.00 -68,000.00 -100.00% 001-000-71300 Tax,Transfer-RealProp -20,000.00 0.00 -2,717.28 -2,717.28 -17,282.72 -86.41% 001-000-72000 License-Business -55,000.00 -22,100.00 -170.00 -22,270.00 -32,730.00 -59.51% 001-000-72105 Permit-Encroachments -6,000.00 -1,454.75 -1,275.25 -2,730.00 -3,270.00 -54.50% 001-000-72110 Permit-Banner -150.00 -50.00 -50.00 -100.00 -50.00 -33.33% 001-000-72115 Permit-GarageSale -50.00 0.00 0.00 0.00 -50.00 -100.00% 001-000-72120 Permit/Licenses-Other -2,300.00 0.00 -485.00 -485.00 -1,815.00 -78.91% 001-000-72125 SignPermits -1,000.00 0.00 0.00 0.00 -1,000.00 -100.00% 001-000-72200 PlanningFees -67,000.00 -286.00 -8,191.40 -8,477.40 -58,522.60 -87.35% 001-000-72205 ZoningApplicationFees -150.00 0.00 0.00 0.00 -150.00 -100.00% 001-000-72210 Subdivisionfees -5,500.00 0.00 0.00 0.00 -5,500.00 -100.00% 001-000-72215 Variance&ConditionalUs -37,000.00 -175.00 -2,190.50 -2,365.50 -34,634.50 -93.61% 001-000-72220 SitePlans -37,000.00 0.00 -300.50 -300.50 -36,699.50 -99.19% 001-000-72225 BuildingPermitFees -120,000.00 -2,808.73 -5,005.15 -7,813.88 -112,186.12 -93.49% 001-000-73000 VehicleCodeFines -5,000.00 -242.32 -426.25 -668.57 -4,331.43 -86.63% 001-000-74120 LeaseRevenue-CingularWi -41,000.00 -6,235.00 -6,390.22 -12,625.22 -28,374.78 -69.21% 001-000-74200 Fees-PDServices -350.00 0.00 -75.40 -75.40 -274.60 -78.46% 001-000-74215 PoliceReport -500.00 -30.00 -30.00 -60.00 -440.00 -88.00% 001-000-74225 CONCEALEDWEAPON -400.00 0.00 0.00 0.00 -400.00 -100.00% 001-000-74230 P.D.&Legalrestitution -1,200.00 0.00 0.00 0.00 -1,200.00 -100.00% 001-000-74235 SpecialPoliceServices -1,800.00 0.00 -100.00 -100.00 -1,700.00 -94.44% 001-000-74400 CemeteryRevenues -1,000.00 0.00 0.00 0.00 -1,000.00 -100.00% 001-000-74415 HistoricalGrammerSchool -17,000.00 -300.00 -900.00 -1,200.00 -15,800.00 -92.94% 513
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 2 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001-000-74425 Cribbs/SnackUtilities -300.00 0.00 0.00 0.00 -300.00 -100.00% 001-000-74430 Fees-CommunityCtrUtil -2,400.00 -175.00 -775.00 -950.00 -1,450.00 -60.42% 001-000-74435 Fees-CommunityCenter -6,000.00 -600.00 -1,885.00 -2,485.00 -3,515.00 -58.58% 001-000-74440 Fees-AuditoriumUse -8,000.00 0.00 -1,975.00 -1,975.00 -6,025.00 -75.31% 001-000-74445 Fees-AuditoriumUtilitie -2,450.00 0.00 -600.00 -600.00 -1,850.00 -75.51% 001-000-74450 Fees-JazzerciseRentalIn -10,350.00 -900.00 -870.00 -1,770.00 -8,580.00 -82.90% 001-000-75000 InterestEarnings -25,000.00 -26,525.77 -6,792.46 -33,318.23 8,318.23 33.27% 001-000-75125 HomeownersPropertyTaxR -5,250.00 0.00 0.00 0.00 -5,250.00 -100.00% 001-000-75200 StateCopsGrant -165,000.00 0.00 0.00 0.00 -165,000.00 -100.00% 001-000-77135 Income-Donations,Priva -1,500.00 0.00 -364.00 -364.00 -1,136.00 -75.73% 000 - NonDepartmental Totals: -2,894,688.00 131,732.91 -82,429.18 49,303.73 -2,943,991.73 Department: 001 - NonDepartmental1
001-001-75200 Rents,Royalties&Commis -3,900.00 -395.00 -290.00 -685.00 -3,215.00 -82.44% 001 - NonDepartmental1 Totals: -3,900.00 -395.00 -290.00 -685.00 -3,215.00 -82.44% Department: 101 - CityCouncil
001-101-40005 Part-TimeWages-CityCouncil 0.00 453.60 0.00 453.60 -453.60 0.00% 001-101-40006 Sal/Wages-Elect-CityCouncil 15,120.00 0.00 1,260.00 1,260.00 13,860.00 91.67% 001-101-40050 FICA-CityCouncil 940.00 28.12 78.12 106.24 833.76 88.70% 001-101-40051 Medicare-CityCouncil 220.00 6.58 18.27 24.85 195.15 88.70% 001-101-40055 SUI-CityCouncil 250.00 8.45 0.00 8.45 241.55 96.62% 001-101-42015 Gen.Supplies-CityCouncil 150.00 0.00 0.00 0.00 150.00 100.00% 001-101-42756 Membership/Dues-CityCouncil 2,150.00 0.00 0.00 0.00 2,150.00 100.00% 101 - CityCouncil Totals: 18,830.00 496.75 1,356.39 1,853.14 16,976.86 90.16% Department: 102 - CityClerk
001-102-40000 Salaries-CityClerk 39,975.00 2,987.24 3,627.00 6,614.24 33,360.76 83.45% 001-102-40015 VacationPayout-CityClerk 1,500.00 0.00 0.00 0.00 1,500.00 100.00% 001-102-40050 FICA-CityClerk 2,478.00 185.21 224.88 410.09 2,067.91 83.45% 001-102-40051 Medicare-CityClerk 580.00 43.32 52.59 95.91 484.09 83.46% 001-102-40055 SUI-CityClerk 126.00 0.00 0.00 0.00 126.00 100.00% 001-102-40060 PERS-CityClerk 3,182.00 237.79 288.72 526.51 2,655.49 83.45% 001-102-40065 Health/LifeIns-CityClerk 14,939.00 1,170.19 2,515.72 3,685.91 11,253.09 75.33% 001-102-40070 WorkersComp.-CityClerk 3,612.00 0.00 941.00 941.00 2,671.00 73.95% 001-102-42015 Gen.Supplies-CityClerk 600.00 0.00 11.95 11.95 588.05 98.01% 001-102-42445 MUNICODEWEB-CityClerk 4,200.00 0.00 0.00 0.00 4,200.00 100.00% 001-102-42760 Travel,Conf,Trg-CityClerk 900.00 0.00 0.00 0.00 900.00 100.00% 001-102-42805 WaterUtilities-CityClerk 480.00 0.00 0.00 0.00 480.00 100.00% 001-102-42810 PG&EUtilities-CityClerk 720.00 0.00 6.82 6.82 713.18 99.05% 001-102-43650 Contracts-Other-CityClerk 600.00 0.00 0.00 0.00 600.00 100.00% 102 - CityClerk Totals: 73,892.00 4,623.75 7,668.68 12,292.43 61,599.57 83.36% Department: 103 - CityTreasurer
001-103-40005 Sal/Wages-Elect-CityTreasurer 2,250.00 67.50 187.50 255.00 1,995.00 88.67% 001-103-40050 FICA-CityTreasurer 140.00 4.19 11.62 15.81 124.19 88.71% 514
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 3 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001-103-40051 Medicare-CityTreasurer 33.00 0.98 2.72 3.70 29.30 88.79% 001-103-40055 SUI-CityTreasurer 47.00 0.00 0.00 0.00 47.00 100.00% 103 - CityTreasurer Totals: 2,470.00 72.67 201.84 274.51 2,195.49 88.89% Department: 104 - CityManager
001-104-40000 Salaries-CityManager 89,976.00 8,173.15 11,413.17 19,586.32 70,389.68 78.23% 001-104-40015 VacationPayout-CityManager 3,325.00 0.00 0.00 0.00 3,325.00 100.00% 001-104-40050 FICA-CITYMANAGER 5,579.00 493.92 701.35 1,195.27 4,383.73 78.58% 001-104-40051 Medicare-CITYMANAGER 1,305.00 114.55 164.02 278.57 1,026.43 78.65% 001-104-40055 SUI-CITYMANAGER 147.00 10.98 9.79 20.77 126.23 85.87% 001-104-40060 PERS-CITYMANAGER 6,091.00 568.62 865.06 1,433.68 4,657.32 76.46% 001-104-40065 Health/LifeIns-CITYMANAGER 17,429.00 2,390.31 3,860.01 6,250.32 11,178.68 64.14% 001-104-40070 WorkersComp.-CITYMANAGER 4,214.00 0.00 1,098.00 1,098.00 3,116.00 73.94% 001-104-42015 Gen.Supplies-CityManager 350.00 0.00 0.00 0.00 350.00 100.00% 001-104-42760 Travel,Conf,Trg-CityManager 875.00 0.00 0.00 0.00 875.00 100.00% 001-104-42805 WaterUtilities-CityManager 208.00 0.00 0.00 0.00 208.00 100.00% 001-104-42810 PG&EUtilities-CityManager 420.00 0.00 4.01 4.01 415.99 99.05% 001-104-42995 CONTINGENCY-CityManager 7,000.00 0.00 0.00 0.00 7,000.00 100.00% 001-104-43600 ProfServices-CityManager 2,625.00 0.00 0.00 0.00 2,625.00 100.00% 104 - CityManager Totals: 139,544.00 11,751.53 18,115.41 29,866.94 109,677.06 78.60% Department: 105 - Finance
001-105-40000 Salaries-Finance 78,186.00 6,200.08 7,367.25 13,567.33 64,618.67 82.65% 001-105-40015 VACATIONPAYOUT-Finance 1,860.00 0.00 0.00 0.00 1,860.00 100.00% 001-105-40050 FICA-Finance 4,848.00 370.54 428.99 799.53 4,048.47 83.51% 001-105-40051 Medicare-Finance 1,134.00 85.15 100.34 185.49 948.51 83.64% 001-105-40055 SUI-Finance 307.00 10.35 9.21 19.56 287.44 93.63% 001-105-40060 PERS-Finance 4,868.00 363.55 423.21 786.76 4,081.24 83.84% 001-105-40065 Health/LifeIns-Finance 18,183.00 2,143.69 6,215.59 8,359.28 9,823.72 54.03% 001-105-40070 WorkersComp.-Finance 8,792.00 0.00 2,572.00 2,572.00 6,220.00 70.75% 001-105-42015 Gen.Supplies-Finance 9,129.00 0.00 200.10 200.10 8,928.90 97.81% 001-105-42435 NetworkSvcsCo-Finance 20,083.00 0.00 446.25 446.25 19,636.75 97.78% 001-105-42760 Travel,Conf,Trg-Finance 548.00 0.00 0.00 0.00 548.00 100.00% 001-105-42805 WaterUtilities-Finance 219.00 0.00 0.00 0.00 219.00 100.00% 001-105-42810 PG&EUtilities-Finance 2,373.00 0.00 325.99 325.99 2,047.01 86.26% 001-105-42955 PayChex&Bank-Finance 2,921.00 370.02 0.00 370.02 2,550.98 87.33% 001-105-43100 Audit&Acctg-Finance 14,788.00 0.00 0.00 0.00 14,788.00 100.00% 001-105-43600 ProfServices-Finance 1,826.00 0.00 0.00 0.00 1,826.00 100.00% 001-105-43650 Contracts-Other-Finance 730.00 0.00 0.00 0.00 730.00 100.00% 001-105-69400 O&MEquipment-Finance 1,826.00 0.00 0.00 0.00 1,826.00 100.00% 105 - Finance Totals: 172,621.00 9,543.38 18,088.93 27,632.31 144,988.69 83.99% Department: 106 - Police
001-106-40000 Salaries-PoliceDept 485,700.00 23,281.53 40,255.69 63,537.22 422,162.78 86.92% 001-106-40006 Overtime-PoliceDept 40,000.00 4,505.82 6,281.74 10,787.56 29,212.44 73.03% 001-106-40015 VacationPayout-PoliceDept 14,243.00 2,810.40 0.00 2,810.40 11,432.60 80.27% 515
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 4 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001-106-40050 FICA-PoliceDept 30,981.00 1,897.07 3,160.03 5,057.10 25,923.90 83.68% 001-106-40051 Medicare-PoliceDept 7,246.00 443.69 739.02 1,182.71 6,063.29 83.68% 001-106-40055 SUI-PoliceDept 1,260.00 2.62 17.84 20.46 1,239.54 98.38% 001-106-40060 PERS-PoliceDept 85,542.00 3,738.37 5,853.35 9,591.72 75,950.28 88.79% 001-106-40065 Health/LifeIns-PoliceDept 113,880.00 7,397.96 5,593.11 12,991.07 100,888.93 88.59% 001-106-40070 WorkersComp.-PoliceDept 36,117.00 0.00 9,408.00 9,408.00 26,709.00 73.95% 001-106-42015 Gen.Supplies-PoliceDept 2,000.00 0.00 139.53 139.53 1,860.47 93.02% 001-106-42020 FUEL-PoliceDept 27,000.00 0.00 2,185.95 2,185.95 24,814.05 91.90% 001-106-42045 SpecialDepart-PoliceDept 1,750.00 0.00 471.08 471.08 1,278.92 73.08% 001-106-42095 Clothing-PoliceDept 2,000.00 0.00 4,430.80 4,430.80 -2,430.80 -121.54% 001-106-42096 SafetyEquip-PoliceDept 5,000.00 0.00 0.00 0.00 5,000.00 100.00% 001-106-42435 NetworkSvcsCo-PoliceDept 6,000.00 0.00 0.00 0.00 6,000.00 100.00% 001-106-42710 Communications-PoliceDept 5,000.00 0.00 64.03 64.03 4,935.97 98.72% 001-106-42760 Travel,Conf,Trg-PoliceDept 5,000.00 0.00 130.00 130.00 4,870.00 97.40% 001-106-42805 WaterUtilities-PoliceDept 500.00 0.00 0.00 0.00 500.00 100.00% 001-106-42810 PG&EUtilities-PoliceDept 7,000.00 0.00 639.20 639.20 6,360.80 90.87% 001-106-42850 VehicleMaintna-PoliceDept 18,000.00 0.00 239.29 239.29 17,760.71 98.67% 001-106-42930 AnimalControl-PoliceDept 38,000.00 0.00 0.00 0.00 38,000.00 100.00% 001-106-42935 Misc-Bookings-PoliceDept 150.00 0.00 0.00 0.00 150.00 100.00% 001-106-42940 Misc-Court/Invs-PoliceDept 100.00 0.00 0.00 0.00 100.00 100.00% 001-106-43700 Dispatching-PoliceDept 175,000.00 0.00 0.00 0.00 175,000.00 100.00% 106 - Police Totals: 1,107,469.00 44,077.46 79,608.66 123,686.12 983,782.88 88.83% Department: 109 - Planning
001-109-40005 Sal/Wages-Elect-Planning 6,750.00 202.50 562.50 765.00 5,985.00 88.67% 001-109-40050 FICA-Planning 425.00 12.56 34.86 47.42 377.58 88.84% 001-109-40051 Medicare-Planning 100.00 2.93 8.15 11.08 88.92 88.92% 001-109-40055 SUI-Planning 130.00 3.73 0.00 3.73 126.27 97.13% 001-109-42015 Gen.Supplies-Planning 200.00 0.00 0.00 0.00 200.00 100.00% 001-109-42510 LAFCOExpense-Planning 6,000.00 5,732.00 0.00 5,732.00 268.00 4.47% 001-109-42750 PHNOTICES-Planning 3,000.00 0.00 0.00 0.00 3,000.00 100.00% 001-109-43450 Planner-Planning 30,000.00 0.00 0.00 0.00 30,000.00 100.00% 001-109-43650 Contracts-Other-Planning 7,996.00 0.00 0.00 0.00 7,996.00 100.00% 109 - Planning Totals: 54,601.00 5,953.72 605.51 6,559.23 48,041.77 87.99% Department: 110 - Building
001-110-42300 E&PReimbEngr.-BuildingDEPT 2,500.00 0.00 0.00 0.00 2,500.00 100.00% 001-110-43250 Engineering-BuildingRegula 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 001-110-43300 PlanChk&Insp-BuildingDEPT 42,000.00 0.00 0.00 0.00 42,000.00 100.00% 110 - Building Totals: 46,500.00 0.00 0.00 0.00 46,500.00 100.00% Department: 111 - Engineering
001-111-42300 E&PReimbEngr.-Engineering 80,000.00 0.00 0.00 0.00 80,000.00 100.00% 001-111-43250 Engineering-Engineering 60,000.00 0.00 0.00 0.00 60,000.00 100.00% 001-111-43300 PlanChk&Insp-Engineering 4,000.00 0.00 0.00 0.00 4,000.00 100.00% 516
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 5 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 111 - Engineering Totals: 144,000.00 0.00 0.00 0.00 144,000.00 100.00% Department: 113 - Parks&Recreation
001-113-40000 Salaries-Parks&Recreat 130,807.00 9,168.94 5,554.90 14,723.84 116,083.16 88.74% 001-113-40006 Overtime-Parks&Recreat 0.00 0.00 30.74 30.74 -30.74 0.00% 001-113-40015 VacationPayout-Parks&Recreat 4,458.00 0.00 0.00 0.00 4,458.00 100.00% 001-113-40050 FICA-Parks&Recreat 7,912.00 567.73 305.42 873.15 7,038.85 88.96% 001-113-40051 Medicare-Parks&Recreat 1,850.00 129.66 71.77 201.43 1,648.57 89.11% 001-113-40055 SUI-Parks&Recreat 370.00 0.00 0.00 0.00 370.00 100.00% 001-113-40060 PERS-Parks&Recreat 15,557.00 573.04 449.02 1,022.06 14,534.94 93.43% 001-113-40065 Health/LifeIns-Parks&Recreat 37,556.00 3,884.39 3,022.74 6,907.13 30,648.87 81.61% 001-113-40070 WorkersComp.-Parks&Recreat 10,593.00 0.00 2,760.00 2,760.00 7,833.00 73.95% 001-113-42015 Gen.Supplies-Parks&Recreat 580.00 0.00 0.00 0.00 580.00 100.00% 001-113-42020 FUEL-Parks&Recreat 7,000.00 0.00 725.08 725.08 6,274.92 89.64% 001-113-42030 Repair/Maint-Parks&Recreat 27,000.00 0.00 3,948.19 3,948.19 23,051.81 85.38% 001-113-42057 Beautification-Parks&Recreat 6,000.00 0.00 0.00 0.00 6,000.00 100.00% 001-113-42095 Clothing-Parks&Recreat 750.00 453.75 0.00 453.75 296.25 39.50% 001-113-42205 Lease-Prkglot-Parks&Recreat 47,000.00 3,790.46 3,850.46 7,640.92 39,359.08 83.74% 001-113-42400 Signs-Parks & Recreat 250.00 0.00 0.00 0.00 250.00 100.00% 001-113-42410 WeedControl-Parks&Recreat 5,000.00 0.00 0.00 0.00 5,000.00 100.00% 001-113-42415 Restrooms-Parks&Recreat 500.00 0.00 0.00 0.00 500.00 100.00% 001-113-42425 Taxes/Fees/Lics-Parks&Recreat 500.00 0.00 0.00 0.00 500.00 100.00% 001-113-42435 NetworkSvcsCo-Parks&Recreat 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 001-113-42805 WaterUtilities-Parks&Recreat 26,000.00 0.00 0.00 0.00 26,000.00 100.00% 001-113-42810 PG&EUtilities-Parks&Recreat 42,000.00 0.00 4,662.53 4,662.53 37,337.47 88.90% 001-113-42850 VehicleMaintna-Parks&Recreat 4,000.00 0.00 418.64 418.64 3,581.36 89.53% 001-113-42860 O&MBlg/Structu-Parks&Recreat 5,000.00 0.00 601.17 601.17 4,398.83 87.98% 001-113-42865 Janitorial-Parks&Recreat 6,500.00 -3,093.40 0.00 -3,093.40 9,593.40 147.59% 001-113-43650 Contracts-Other-Parks&Recreat 19,500.00 0.00 0.00 0.00 19,500.00 100.00% 001-113-44000 SmallEquipment-Parks&Recreat 2,500.00 0.00 0.00 0.00 2,500.00 100.00% 113 - Parks&Recreation Totals: 411,183.00 15,474.57 26,400.66 41,875.23 369,307.77 89.82% Department: 114 - SwimmingPool
001-114-40000 Salaries-SwimmingPool 0.00 384.52 0.00 384.52 -384.52 0.00% 001-114-40050 FICA-SwimmingPool 0.00 23.84 0.00 23.84 -23.84 0.00% 001-114-40051 Medicare-SwimmingPool 0.00 5.58 0.00 5.58 -5.58 0.00% 001-114-40060 PERS-SwimmingPool 0.00 53.10 0.00 53.10 -53.10 0.00% 001-114-40065 HealthBenefits-SwimmingPool 0.00 140.42 127.40 267.82 -267.82 0.00% 001-114-42015 Gen.Supplies-SwimmingPool 250.00 0.00 0.00 0.00 250.00 100.00% 001-114-42025 Supplies-Chem-SwimmingPool 6,000.00 0.00 0.00 0.00 6,000.00 100.00% 001-114-42425 Taxes/Fees/Lics-SwimmingPool 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 001-114-42860 O&MBlg/Structu-SwimmingPool 4,000.00 0.00 0.00 0.00 4,000.00 100.00% 001-114-43650 Contracts-Other-SwimmingPool 40,500.00 0.00 0.00 0.00 40,500.00 100.00% 114 - SwimmingPool Totals: 51,750.00 607.46 127.40 734.86 51,015.14 98.58% Department: 115 - Marketing
517
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 6 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001-115-42055 CommunityProm-Promotions 7,500.00 325.00 500.00 825.00 6,675.00 89.00% 001-115-42436 InternetServic-Promotions 8,600.00 0.00 0.00 0.00 8,600.00 100.00% 001-115-42745 Advertising-Promotions 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 001-115-42756 Membership/Dues-Promotions 125.00 0.00 0.00 0.00 125.00 100.00% 115 - Marketing Totals: 17,225.00 325.00 500.00 825.00 16,400.00 95.21% Department: 140 - Cemetery
001-140-40065 EmployeeBenefi-Cemetery 0.00 118.19 33.21 151.40 -151.40 0.00% 140 - Cemetery Totals: 0.00 118.19 33.21 151.40 -151.40 0.00% Department: 172 - MonteVerdeMuseum
001-172-40000 Salaries-MonteVerdeMuse 0.00 107.91 0.00 107.91 -107.91 0.00% 001-172-40050 FICA-MonteVerdeMuse 0.00 6.67 0.00 6.67 -6.67 0.00% 001-172-40051 Medicare-MonteVerdeMuse 0.00 1.57 0.00 1.57 -1.57 0.00% 001-172-42810 PG&EUtilities-MonteVerdeMuse 0.00 0.00 114.75 114.75 -114.75 0.00% 172 - MonteVerdeMuseum Totals: 0.00 116.15 114.75 230.90 -230.90 0.00% Department: 610 - CentralServices
001-610-40065 Health/LifeIns-CentralServies 1,700.00 0.00 0.00 0.00 1,700.00 100.00% 001-610-42015 Gen.Supplies-CentralServies 800.00 0.00 0.00 0.00 800.00 100.00% 001-610-42030 Repair/Maint-CentralServies 400.00 0.00 0.00 0.00 400.00 100.00% 001-610-42031 EquipmtMaint.-CentralServies 400.00 0.00 0.00 0.00 400.00 100.00% 001-610-42435 NetworkSvcsCo-CentralServies 12,000.00 0.00 0.00 0.00 12,000.00 100.00% 001-610-42436 InternetServic-CentralServies 4,000.00 0.00 1,284.98 1,284.98 2,715.02 67.88% 001-610-42710 Communications-CentralServies 2,000.00 0.00 176.64 176.64 1,823.36 91.17% 001-610-42755 RiskManagement-CentralServies 214,000.00 0.00 134,882.00 134,882.00 79,118.00 36.97% 001-610-42756 Membership/Dues-CentralServies 1,000.00 0.00 80.00 80.00 920.00 92.00% 610 - CentralServices Totals: 236,300.00 0.00 136,423.62 136,423.62 99,876.38 42.27% Department: 613 - CityAttorney
001-613-43350 Speciallegal-LEGALSERVICES 27,500.00 3,750.00 0.00 3,750.00 23,750.00 86.36% 613 - CityAttorney Totals: 27,500.00 3,750.00 0.00 3,750.00 23,750.00 86.36% 001 - GeneralFund Totals: -394,703.00 228,248.54 206,525.88 434,774.42 -829,477.42 003 - Streets/Sidewal
Department: 000 - NonDepartmental
003-000-75100 VehicleLicenseFee -5,000.00 0.00 0.00 0.00 -5,000.00 -100.00% 003-000-75320 2107HighwayUserTax -46,500.00 -4,007.21 -3,961.80 -7,969.01 -38,530.99 -82.86% 003-000-75321 2105HighwayUserTax -16,500.00 -1,431.26 -1,305.49 -2,736.75 -13,763.25 -83.41% 003-000-75322 2106HighwayUserTax -16,500.00 -1,476.53 -1,420.22 -2,896.75 -13,603.25 -82.44% 003-000-75323 2107-5HighwayUserTax -1,000.00 0.00 -1,000.00 -1,000.00 0.00 0.00% 003-000-75325 RoadMaintenance&Rehabi -71,000.00 -6,047.15 -6,667.58 -12,714.73 -58,285.27 -82.09% 000 - NonDepartmental Totals: -156,500.00 -12,962.15 -14,355.09 -27,317.24 -129,182.76 -82.54% Department: 104 - CityManager
003-104-40000 Salaries-CITYMANAGER 12,854.00 701.94 0.00 701.94 12,152.06 94.54% 003-104-40015 VACATIONPAYOUT-CITYMANAGER 475.00 0.00 0.00 0.00 475.00 100.00% 518
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 7 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 003-104-40050 FICA-CityManager 797.00 43.52 0.00 43.52 753.48 94.54% 003-104-40051 Medicare-CITYMANAGER 186.00 10.18 0.00 10.18 175.82 94.53% 003-104-40055 SUI-CityManager 21.00 0.00 0.00 0.00 21.00 100.00% 003-104-40060 PERS-CITYMANAGER 870.00 55.87 0.00 55.87 814.13 93.58% 003-104-40065 EmployeeBenefi-CityManager 2,490.00 93.61 70.21 163.82 2,326.18 93.42% 003-104-40070 WorkersComp.-CITYMANAGER 602.00 0.00 157.00 157.00 445.00 73.92% 003-104-42015 Gen.Supplies-CITYMANAGER 50.00 0.00 0.00 0.00 50.00 100.00% 003-104-42760 Travel,Conf,Trg-CityManager 125.00 0.00 0.00 0.00 125.00 100.00% 003-104-42805 WaterUtilities-CityManager 30.00 0.00 0.00 0.00 30.00 100.00% 003-104-42810 PG&EUtilities-CityManager 60.00 0.00 0.80 0.80 59.20 98.67% 003-104-42995 CONTINGENCY-CityManager 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 003-104-43600 ProfServices-CityManager 375.00 0.00 0.00 0.00 375.00 100.00% 104 - CityManager Totals: 19,935.00 905.12 228.01 1,133.13 18,801.87 94.32% Department: 105 - Finance
003-105-40000 Salaries-Finance 13,327.00 562.19 937.10 1,499.29 11,827.71 88.75% 003-105-40015 VACATIONPAYOUT-Finance 317.00 0.00 0.00 0.00 317.00 100.00% 003-105-40050 FICA-Finance 826.00 34.86 58.10 92.96 733.04 88.75% 003-105-40051 Medicare-Finance 193.00 8.15 13.59 21.74 171.26 88.74% 003-105-40055 SUI-Finance 52.00 2.59 0.00 2.59 49.41 95.02% 003-105-40060 PERS-Finance 830.00 44.75 74.60 119.35 710.65 85.62% 003-105-40065 EmployeeBenefi-Finance 3,099.00 214.81 504.32 719.13 2,379.87 76.79% 003-105-40070 WorkersComp.-Finance 1,499.00 0.00 376.00 376.00 1,123.00 74.92% 003-105-42015 Gen.Supplies-Finance 1,556.00 0.00 24.71 24.71 1,531.29 98.41% 003-105-42435 NetworkSvcsCo-Finance 3,423.00 0.00 78.75 78.75 3,344.25 97.70% 003-105-42760 Travel,Conf,Trg-Finance 93.00 0.00 0.00 0.00 93.00 100.00% 003-105-42805 WaterUtilities-Finance 37.00 0.00 0.00 0.00 37.00 100.00% 003-105-42810 PG&EUtilities-Finance 405.00 0.00 57.53 57.53 347.47 85.80% 003-105-42955 PayChex&Bank-Finance 498.00 38.28 0.00 38.28 459.72 92.31% 003-105-43100 Audit&Acctg-Finance 2,521.00 0.00 0.00 0.00 2,521.00 100.00% 003-105-43600 ProfServices-Finance 311.00 0.00 0.00 0.00 311.00 100.00% 003-105-43650 Contracts-Other-Finance 124.00 0.00 0.00 0.00 124.00 100.00% 003-105-69400 O&MEquipment-Finance 311.00 0.00 0.00 0.00 311.00 100.00% 105 - Finance Totals: 29,422.00 905.63 2,124.70 3,030.33 26,391.67 89.70% Department: 112 - Streets/Roads
003-112-40000 Salaries-Streets/Roads 59,862.00 3,979.92 4,628.84 8,608.76 51,253.24 85.62% 003-112-40006 Overtime-Streets/Roads 0.00 0.00 30.74 30.74 -30.74 0.00% 003-112-40015 VACATIONPAYOUT-Streets/Roads 2,091.00 0.00 0.00 0.00 2,091.00 100.00% 003-112-40050 FICA-Streets/Roads 3,711.00 260.39 261.14 521.53 3,189.47 85.95% 003-112-40051 Medicare-Streets/Roads 868.00 60.90 61.32 122.22 745.78 85.92% 003-112-40055 SUI-Streets/Roads 173.00 0.00 0.00 0.00 173.00 100.00% 003-112-40060 PERS-Streets/Roads 7,297.00 478.03 457.17 935.20 6,361.80 87.18% 003-112-40065 Health/LifeIns-Streets/Roads 17,617.00 2,142.07 2,486.79 4,628.86 12,988.14 73.73% 003-112-40070 WorkersComp.-Streets/Roads 4,969.00 0.00 1,294.00 1,294.00 3,675.00 73.96% 519
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 8 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 003-112-42015 Gen.Supplies-Streets/Roads 1,500.00 0.00 0.00 0.00 1,500.00 100.00% 003-112-42020 FUEL-Streets/Roads 5,000.00 0.00 484.81 484.81 4,515.19 90.30% 003-112-42030 Repair/Maint-Streets/Roads 0.00 0.00 92.56 92.56 -92.56 0.00% 003-112-42095 Clothing-Streets/Roads 750.00 220.00 0.00 220.00 530.00 70.67% 003-112-42200 Patching-Streets/Roads 7,500.00 0.00 0.00 0.00 7,500.00 100.00% 003-112-42400 Signs-Streets/Roads 250.00 0.00 0.00 0.00 250.00 100.00% 003-112-42405 FloodControl-Streets/Roads 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 003-112-42410 WeedControl-Streets/Roads 4,000.00 0.00 0.00 0.00 4,000.00 100.00% 003-112-42800 PublicUtility-Streets/Roads 0.00 0.00 60.74 60.74 -60.74 0.00% 003-112-42810 PG&EUtilities-Streets/Roads 0.00 0.00 110.85 110.85 -110.85 0.00% 003-112-42815 StreetLights-Streets/Roads 42,000.00 0.00 3,201.89 3,201.89 38,798.11 92.38% 003-112-42850 VehicleMaintna-Streets/Roads 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 003-112-42860 O&MBlg/Structu-Streets/Roads 20,000.00 0.00 0.00 0.00 20,000.00 100.00% 003-112-43650 Contracts-Other-Streets/Roads 0.00 0.00 -1,000.00 -1,000.00 1,000.00 0.00% 003-112-69400 O&MEquipment-Streets/Roads 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 003-112-69600 Improvements-Streets/Roads 42,500.00 0.00 0.00 0.00 42,500.00 100.00% 112 - Streets/Roads Totals: 224,088.00 7,141.31 12,170.85 19,312.16 204,775.84 91.38% 003 - Streets/Sidewal Totals: 116,945.00 -4,010.09 168.47 -3,841.62 120,786.62 004 - CrestviewLgt/D
Department: 000 - NonDepartmental
004-000-74330 StreetLightingCharges -2,650.00 0.00 0.00 0.00 -2,650.00 -100.00% 000 - NonDepartmental Totals: -2,650.00 0.00 0.00 0.00 -2,650.00 -100.00% Department: 105 - Finance
004-105-40000 Salaries-Finance 10,662.00 46.85 228.50 275.35 10,386.65 97.42% 004-105-40015 VacationPayout-Finance 254.00 0.00 0.00 0.00 254.00 100.00% 004-105-40050 FICA-Finance 661.00 2.90 14.16 17.06 643.94 97.42% 004-105-40051 Medicare-Finance 155.00 0.68 3.32 4.00 151.00 97.42% 004-105-40055 SUI-Finance 42.00 2.59 0.00 2.59 39.41 93.83% 004-105-40060 PERS-Finance 664.00 3.72 18.19 21.91 642.09 96.70% 004-105-40065 EmployeeBenefi-Finance 2,479.00 0.00 73.43 73.43 2,405.57 97.04% 004-105-40070 WorkersComp.-Finance 1,199.00 0.00 0.00 0.00 1,199.00 100.00% 004-105-42015 Gen.Supplies-Finance 1,245.00 0.00 0.00 0.00 1,245.00 100.00% 004-105-42435 NetworkSvcsCo-Finance 2,739.00 0.00 0.00 0.00 2,739.00 100.00% 004-105-42760 Travel,Conf,Trg-Finance 75.00 0.00 0.00 0.00 75.00 100.00% 004-105-42805 WaterUtilities-Finance 30.00 0.00 0.00 0.00 30.00 100.00% 004-105-42810 PG&EUtilities-Finance 324.00 0.00 0.00 0.00 324.00 100.00% 004-105-42955 PayChex&Bank-Finance 398.00 0.00 0.00 0.00 398.00 100.00% 004-105-43100 Audit&Acctg-Finance 2,017.00 0.00 0.00 0.00 2,017.00 100.00% 004-105-43600 ProfServices-Finance 249.00 0.00 0.00 0.00 249.00 100.00% 004-105-43650 Contracts-Other-Finance 100.00 0.00 0.00 0.00 100.00 100.00% 004-105-69400 O&MEquipment-Finance 249.00 0.00 0.00 0.00 249.00 100.00% 105 - Finance Totals: 23,542.00 56.74 337.60 394.34 23,147.66 98.32% 520
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 9 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining Department: 145 - CrestViewLgt
004-145-42815 StreetLights-CrestViewLgt 0.00 0.00 125.88 125.88 -125.88 0.00% 145 - CrestViewLgt Totals: 0.00 0.00 125.88 125.88 -125.88 0.00% 004 - CrestviewLgt/D Totals: 20,892.00 56.74 463.48 520.22 20,371.78 010 - SewerM&O
Department: 000 - NonDepartmental
010-000-74500 SewerServiceCharges -2,967,587.00 -250,173.79 -197,668.45 -447,842.24 -2,519,744.76 -84.91% 010-000-74505 SepticDumpingFee -50,000.00 -4,591.19 -4,345.70 -8,936.89 -41,063.11 -82.13% 010-000-74510 ContractSewerRevAWA& -223,120.00 -23,104.33 -23,104.33 -46,208.66 -176,911.34 -79.29% 010-000-75000 InterestEarnings -16,000.00 0.00 0.00 0.00 -16,000.00 -100.00% 010-000-77115 EffluentDisposal -156,068.00 -19,124.25 -14,462.61 -33,586.86 -122,481.14 -78.48% 010-000-77130 LateCharges -40,000.00 0.00 0.00 0.00 -40,000.00 -100.00% 010-000-78999 OperatingTransfersIn -830,000.00 0.00 0.00 0.00 -830,000.00 -100.00% 000 - NonDepartmental Totals: -4,282,775.00 -296,993.56 -239,581.09 -536,574.65 -3,746,200.35 -87.47% Department: 001 - NonDepartmental1
010-001-74500 SewerSvcChrgesAmadorC -48,871.00 0.00 0.00 0.00 -48,871.00 -100.00% 001 - NonDepartmental1 Totals: -48,871.00 0.00 0.00 0.00 -48,871.00 -100.00% Department: 102 - CityClerk
010-102-40000 Salaries-CityClerk 16,656.00 351.44 983.13 1,334.57 15,321.43 91.99% 010-102-40015 VacationPayout-CityClerk 625.00 0.00 0.00 0.00 625.00 100.00% 010-102-40050 FICA-CityClerk 1,033.00 21.79 60.95 82.74 950.26 91.99% 010-102-40051 Medicare-CityClerk 242.00 5.10 14.26 19.36 222.64 92.00% 010-102-40055 SUI-CityClerk 53.00 0.00 0.00 0.00 53.00 100.00% 010-102-40060 PERS-CityClerk 1,326.00 27.98 78.26 106.24 1,219.76 91.99% 010-102-40065 Health/LifeIns-CityClerk 6,225.00 450.72 701.32 1,152.04 5,072.96 81.49% 010-102-40070 WorkersComp.-CityClerk 1,505.00 0.00 392.00 392.00 1,113.00 73.95% 010-102-42015 Gen.Supplies-CityClerk 250.00 0.00 0.00 0.00 250.00 100.00% 010-102-42445 MUNICODEWEB-CityClerk 1,750.00 0.00 0.00 0.00 1,750.00 100.00% 010-102-42760 Travel,Conf,Trg-CityClerk 375.00 0.00 0.00 0.00 375.00 100.00% 010-102-42805 WaterUtilities-CityClerk 200.00 0.00 0.00 0.00 200.00 100.00% 010-102-42810 PG&EUtilities-CityClerk 300.00 0.00 0.80 0.80 299.20 99.73% 010-102-43650 City Clerk - Contracts 250.00 0.00 0.00 0.00 250.00 100.00% 102 - CityClerk Totals: 30,790.00 857.03 2,230.72 3,087.75 27,702.25 89.97% Department: 104 - CityManager
010-104-40000 Salaries-CITYMANAGER 89,976.00 3,576.77 4,867.54 8,444.31 81,531.69 90.61% 010-104-40015 VacationPayout-CityManager 3,325.00 0.00 0.00 0.00 3,325.00 100.00% 010-104-40050 FICA-CityManager 5,579.00 208.95 295.82 504.77 5,074.23 90.95% 010-104-40051 Medicare-CITYMANAGER 1,305.00 49.83 69.19 119.02 1,185.98 90.88% 010-104-40055 SUI-CityManager 147.00 10.97 0.00 10.97 136.03 92.54% 010-104-40060 PERS-CITYMANAGER 6,091.00 278.74 379.10 657.84 5,433.16 89.20% 010-104-40065 Health/LifeIns-CITYMANAGER 17,429.00 1,531.92 1,672.25 3,204.17 14,224.83 81.62% 010-104-40070 WorkersComp.-CityManager 4,214.00 0.00 1,098.00 1,098.00 3,116.00 73.94% 521
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 10 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 010-104-42015 Gen.Supplies-CityManager 350.00 0.00 0.00 0.00 350.00 100.00% 010-104-42760 Travel,Conf,Trg-CityManager 875.00 0.00 0.00 0.00 875.00 100.00% 010-104-42805 WaterUtilities-CityManager 208.00 0.00 0.00 0.00 208.00 100.00% 010-104-42810 PG&EUtilities-CityManager 420.00 0.00 1.61 1.61 418.39 99.62% 010-104-42995 CONTINGENCY-CityManager 7,000.00 0.00 0.00 0.00 7,000.00 100.00% 010-104-43600 ProfServices-CityManager 2,625.00 0.00 0.00 0.00 2,625.00 100.00% 104 - CityManager Totals: 139,544.00 5,657.18 8,383.51 14,040.69 125,503.31 89.94% Department: 105 - Finance
010-105-40000 Salaries-Finance 87,071.00 3,338.27 5,216.34 8,554.61 78,516.39 90.18% 010-105-40015 VacationPayout-Finance 2,071.00 0.00 0.00 0.00 2,071.00 100.00% 010-105-40050 FICA-Finance 5,398.00 193.10 310.43 503.53 4,894.47 90.67% 010-105-40051 Medicare-Finance 1,263.00 48.40 72.61 121.01 1,141.99 90.42% 010-105-40055 SUI-Finance 342.00 7.77 6.14 13.91 328.09 95.93% 010-105-40060 PERS-Finance 5,421.00 154.19 315.65 469.84 4,951.16 91.33% 010-105-40065 Health/LifeIns-Finance 20,249.00 1,230.85 3,368.04 4,598.89 15,650.11 77.29% 010-105-40070 WorkersComp.-Finance 9,791.00 0.00 2,572.00 2,572.00 7,219.00 73.73% 010-105-42015 Gen.Supplies-Finance 10,166.00 0.00 87.87 87.87 10,078.13 99.14% 010-105-42435 NetworkSvcsCo-Finance 22,365.00 0.00 280.00 280.00 22,085.00 98.75% 010-105-42450 MOMonlinefees-Finance 11,000.00 0.00 0.00 0.00 11,000.00 100.00% 010-105-42760 Travel,Conf,Trg-Finance 610.00 0.00 0.00 0.00 610.00 100.00% 010-105-42805 WaterUtilities-Finance 244.00 0.00 0.00 0.00 244.00 100.00% 010-105-42810 PG&EUtilities-Finance 2,643.00 0.00 204.54 204.54 2,438.46 92.26% 010-105-42955 PayChex&Bank-Finance 3,253.00 229.67 0.00 229.67 3,023.33 92.94% 010-105-43100 Audit&Acctg-Finance 16,469.00 0.00 0.00 0.00 16,469.00 100.00% 010-105-43600 ProfServices-Finance 2,033.00 0.00 0.00 0.00 2,033.00 100.00% 010-105-43650 Contracts-Other-Finance 813.00 0.00 0.00 0.00 813.00 100.00% 010-105-69400 O&MEquipment-Finance 2,033.00 0.00 0.00 0.00 2,033.00 100.00% 105 - Finance Totals: 203,235.00 5,202.25 12,433.62 17,635.87 185,599.13 91.32% Department: 151 - SewerTreatment
010-151-40000 Salaries-SewerTreatment 111,421.00 6,527.06 9,757.52 16,284.58 95,136.42 85.38% 010-151-40006 Overtime-SewerTreatment 10,000.00 348.96 430.29 779.25 9,220.75 92.21% 010-151-40015 VacationPayout-SewerTreatment 3,892.00 0.00 0.00 0.00 3,892.00 100.00% 010-151-40050 FICA-SewerTreatment 6,908.00 425.67 603.91 1,029.58 5,878.42 85.10% 010-151-40051 Medicare-SewerTreatment 1,616.00 100.99 141.42 242.41 1,373.59 85.00% 010-151-40055 SUI-SewerTreatment 323.00 0.00 0.00 0.00 323.00 100.00% 010-151-40060 PERS-SewerTreatment 13,583.00 819.93 1,313.77 2,133.70 11,449.30 84.29% 010-151-40061 PERSUnfunded-SewerTreatment 66,423.00 66,423.00 0.00 66,423.00 0.00 0.00% 010-151-40065 Health/LifeIns-SewerTreatment 32,790.00 2,304.79 5,814.59 8,119.38 24,670.62 75.24% 010-151-40070 WorkersComp.-SewerTreatment 9,249.00 0.00 2,409.00 2,409.00 6,840.00 73.95% 010-151-42015 Supplies-Lab-SewerTreatment 9,500.00 0.00 0.00 0.00 9,500.00 100.00% 010-151-42020 FUEL-SewerTreatment 6,000.00 0.00 338.35 338.35 5,661.65 94.36% 010-151-42025 Supplies-Chem-SewerTreatment 115,000.00 0.00 7,733.24 7,733.24 107,266.76 93.28% 010-151-42031 EquipmtMaint.-SewerTreatment 36,000.00 0.00 0.00 0.00 36,000.00 100.00% 522
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 11 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 010-151-42045 Sludge-SewerTreatment 60,000.00 0.00 0.00 0.00 60,000.00 100.00% 010-151-42095 Clothing-SewerTreatment 750.00 453.75 0.00 453.75 296.25 39.50% 010-151-42215 Rentals-Mach/Eq-SewerTreatment 15,000.00 0.00 0.00 0.00 15,000.00 100.00% 010-151-42425 Taxes/Fees/Lics-SewerTreatment 37,000.00 0.00 0.00 0.00 37,000.00 100.00% 010-151-42435 NetworkSvcsCo-SewerTreatment 3,000.00 0.00 0.00 0.00 3,000.00 100.00% 010-151-42436 InternetServic-SewerTreatment 1,000.00 143.90 186.35 330.25 669.75 66.98% 010-151-42710 Communications-SewerTreatment 500.00 0.00 31.65 31.65 468.35 93.67% 010-151-42756 Membership/Dues-SewerTreatment 900.00 0.00 0.00 0.00 900.00 100.00% 010-151-42760 Travel,Conf,Trg-SewerTreatment 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 010-151-42805 WaterUtilities-SewerTreatment 12,000.00 0.00 0.00 0.00 12,000.00 100.00% 010-151-42810 PG&EUtilities-SewerTreatment 36,000.00 0.00 4,103.71 4,103.71 31,896.29 88.60% 010-151-42830 O&M-SewerPlt-SewerTreatment 25,000.00 35.46 3,462.59 3,498.05 21,501.95 86.01% 010-151-42850 VehicleMaintna-SewerTreatment 5,500.00 0.00 0.00 0.00 5,500.00 100.00% 010-151-43250 Engineering-SewerTreatment 50,000.00 0.00 0.00 0.00 50,000.00 100.00% 010-151-43650 Contracts-Other-SewerTreatment 0.00 0.00 5,338.50 5,338.50 -5,338.50 0.00% 010-151-45100 PrincipalPymt-SewerTreatment 26,000.00 0.00 0.00 0.00 26,000.00 100.00% 010-151-45200 InterestExpens-SewerTreatment 18,300.00 0.00 0.00 0.00 18,300.00 100.00% 010-151-69600 Improvements-SewerTreatment 110,000.00 0.00 0.00 0.00 110,000.00 100.00% 010-151-69701 Machinery&-SewerTreatment 10,000.00 0.00 625.00 625.00 9,375.00 93.75% 151 - SewerTreatment Totals: 834,655.00 77,583.51 42,289.89 119,873.40 714,781.60 85.64% Department: 152 - SewerCollection
010-152-40000 Salaries-SewerCollectio 101,208.00 3,351.61 9,996.60 13,348.21 87,859.79 86.81% 010-152-40006 Overtime-SewerCollectio 0.00 0.00 723.56 723.56 -723.56 0.00% 010-152-40015 VacationPayout-SewerCollectio 3,535.00 0.00 0.00 0.00 3,535.00 100.00% 010-152-40050 FICA-SewerCollectio 6,275.00 217.66 632.05 849.71 5,425.29 86.46% 010-152-40051 Medicare-SewerCollectio 1,468.00 50.90 148.02 198.92 1,269.08 86.45% 010-152-40055 SUI-SewerCollectio 293.00 0.00 0.00 0.00 293.00 100.00% 010-152-40060 PERS-SewerCollectio 12,338.00 349.43 1,138.99 1,488.42 10,849.58 87.94% 010-152-40061 PERSUnfunded-SewerCollectio 66,423.00 66,423.00 0.00 66,423.00 0.00 0.00% 010-152-40065 Health/LifeIns-SewerCollectio 29,784.00 1,160.97 4,491.12 5,652.09 24,131.91 81.02% 010-152-40070 WorkersComp.-SewerCollectio 8,401.00 0.00 2,189.00 2,189.00 6,212.00 73.94% 010-152-42015 Gen.Supplies-SewerCollectio 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 010-152-42095 Clothing-SewerCollectio 750.00 247.50 0.00 247.50 502.50 67.00% 010-152-42425 Taxes/Fees/Lics-SewerCollectio 4,500.00 0.00 0.00 0.00 4,500.00 100.00% 010-152-42455 ComputerMaint.-SewerCollectio 8,000.00 0.00 0.00 0.00 8,000.00 100.00% 010-152-42850 VehicleMaintna-SewerCollectio 2,500.00 0.00 0.00 0.00 2,500.00 100.00% 010-152-42860 O&MBlg/Structu-SewerCollectio 3,000.00 0.00 0.00 0.00 3,000.00 100.00% 010-152-43250 Engineering-SewerCollectio 16,000.00 0.00 0.00 0.00 16,000.00 100.00% 010-152-69400 O&MEquipment-SewerCollectio 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 010-152-69600 Improvements-SewerCollectio 776,631.00 0.00 161,670.05 161,670.05 614,960.95 79.18% 152 - SewerCollection Totals: 1,045,106.00 71,801.07 180,989.39 252,790.46 792,315.54 75.81% Department: 610 - CentralServices
010-610-40065 Health/LifeIns-CentralServies 1,275.00 0.00 0.00 0.00 1,275.00 100.00% 523
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 12 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 010-610-42015 Gen.Supplies-CentralServies 600.00 0.00 0.00 0.00 600.00 100.00% 010-610-42031 EquipmtMaint.-CentralServies 300.00 0.00 0.00 0.00 300.00 100.00% 010-610-42435 NetworkSvcsCo-CentralServies 9,000.00 0.00 909.00 909.00 8,091.00 89.90% 010-610-42436 InternetServic-CentralServies 3,000.00 0.00 375.98 375.98 2,624.02 87.47% 010-610-42710 Communications-CentralServies 1,500.00 0.00 0.00 0.00 1,500.00 100.00% 010-610-42755 RiskManagement-CentralServies 160,500.00 0.00 101,162.00 101,162.00 59,338.00 36.97% 010-610-42756 Membership/Dues-CentralServies 750.00 0.00 0.00 0.00 750.00 100.00% 010-610-69800 ComputerHardwr-CentralServies 300.00 0.00 0.00 0.00 300.00 100.00% 610 - CentralServices Totals: 177,225.00 0.00 102,446.98 102,446.98 74,778.02 42.19% Department: 613 - CityAttorney
010-613-43350 Speciallegal-LEGALSERVICES 5,500.00 0.00 0.00 0.00 5,500.00 100.00% 613 - CityAttorney Totals: 5,500.00 0.00 0.00 0.00 5,500.00 100.00% 010 - SewerM&O Totals: -1,895,591.00 -135,892.52 109,193.02 -26,699.50 -1,868,891.50 011 - SewerWWTP
Department: 000 - NonDepartmental
011-000-75000 InterestEarnings -7,000.00 0.00 0.00 0.00 -7,000.00 -100.00% 011-000-77115 SewerConnectionCharges 0.00 -12,500.00 -6,250.00 -18,750.00 18,750.00 0.00% 000 - NonDepartmental Totals: -7,000.00 -12,500.00 -6,250.00 -18,750.00 11,750.00 167.86% 011 - SewerWWTP Totals: -7,000.00 -12,500.00 -6,250.00 -18,750.00 11,750.00 167.86% 012 - SewerLineRep.

Department: 000 - NonDepartmental
012-000-75000 InterestEarnings -7,000.00 0.00 0.00 0.00 -7,000.00 -100.00% 000 - NonDepartmental Totals: -7,000.00 0.00 0.00 0.00 -7,000.00 -100.00% 012 - SewerLineRep. Totals: -7,000.00 0.00 0.00 0.00 -7,000.00 -100.00% 014 - SewerCapRes
Department: 000 - NonDepartmental
014-000-75000 InterestEarnings -11,000.00 0.00 0.00 0.00 -11,000.00 -100.00% 000 - NonDepartmental Totals: -11,000.00 0.00 0.00 0.00 -11,000.00 -100.00% 014 - SewerCapRes Totals: -11,000.00 0.00 0.00 0.00 -11,000.00 -100.00% 042 - AB1600
Department: 000 - NonDepartmental
042-000-74345 GENERALDEVELOPERIMPACT -7,720.00 0.00 0.00 0.00 -7,720.00 -100.00% 042-000-75000 Income-InterestEarning -1,000.00 0.00 0.00 0.00 -1,000.00 -100.00% 000 - NonDepartmental Totals: -8,720.00 0.00 0.00 0.00 -8,720.00 -100.00% Department: 106 - Police
042-106-69701 Machinery&-PoliceDept 47,031.00 0.00 0.00 0.00 47,031.00 100.00% 106 - Police Totals: 47,031.00 0.00 0.00 0.00 47,031.00 100.00% Department: 113 - Parks&Recreation
042-113-69701 Machinery&-Parks&Recreat 25,360.00 0.00 0.00 0.00 25,360.00 100.00% 113 - Parks&Recreation Totals: 25,360.00 0.00 0.00 0.00 25,360.00 100.00% 524
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 13 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 042 - AB1600 Totals: 63,671.00 0.00 0.00 0.00 63,671.00 059 - BuildingFacili
Department: 105 - Finance
059-105-42015 Gen.Supplies-Finance 0.00 0.00 100.49 100.49 -100.49 0.00% 105 - Finance Totals: 0.00 0.00 100.49 100.49 -100.49 0.00% Department: 113 - Parks&Recreation
059-113-42810 PG&EUtilities-Parks&Recreat 0.00 0.00 1,646.64 1,646.64 -1,646.64 0.00% 113 - Parks&Recreation Totals: 0.00 0.00 1,646.64 1,646.64 -1,646.64 0.00% 059 - BuildingFacili Totals: 0.00 0.00 1,747.13 1,747.13 -1,747.13 0.00% 073 - ParkImpactFee
Department: 000 - NonDepartmental
073-000-74360 PARKSREGIONALIMPACTFEE -13,701.00 0.00 0.00 0.00 -13,701.00 -100.00% 073-000-75120 Grants - Local, Other 0.00 -112,500.00 0.00 -112,500.00 112,500.00 0.00% 000 - NonDepartmental Totals: -13,701.00 -112,500.00 0.00 -112,500.00 98,799.00 721.11% Department: 113 - Parks&Recreation
073-113-69600 Improvements-Parks&Recreat 172,000.00 0.00 0.00 0.00 172,000.00 100.00% 113 - Parks&Recreation Totals: 172,000.00 0.00 0.00 0.00 172,000.00 100.00% 073 - ParkImpactFee Totals: 158,299.00 -112,500.00 0.00 -112,500.00 270,799.00 080 - EffluentDisp.

Department: 102 - CityClerk
080-102-40000 Salaries-CityClerk 9,994.00 175.72 589.87 765.59 9,228.41 92.34% 080-102-40015 VacationPayout-CityClerk 375.00 0.00 0.00 0.00 375.00 100.00% 080-102-40050 FICA-CityClerk 620.00 10.89 36.57 47.46 572.54 92.35% 080-102-40051 Medicare-CityClerk 145.00 2.55 8.55 11.10 133.90 92.34% 080-102-40055 SUI-CityClerk 32.00 0.00 0.00 0.00 32.00 100.00% 080-102-40060 PERS-CityClerk 796.00 13.99 46.94 60.93 735.07 92.35% 080-102-40065 EmployeeBenefi-CityClerk 3,735.00 91.29 302.19 393.48 3,341.52 89.47% 080-102-40070 WorkersComp.-CityClerk 903.00 0.00 235.00 235.00 668.00 73.98% 080-102-42015 Gen.Supplies-CityClerk 150.00 0.00 0.00 0.00 150.00 100.00% 080-102-42445 MuniCodeWeb-CityClerk 1,050.00 0.00 0.00 0.00 1,050.00 100.00% 080-102-42760 City Clerk - Travel/Conferences/Training 225.00 0.00 0.00 0.00 225.00 100.00% 080-102-42805 WaterUtilities-CityClerk 120.00 0.00 0.00 0.00 120.00 100.00% 080-102-42810 PG&EUtilities-CityClerk 180.00 0.00 0.40 0.40 179.60 99.78% 080-102-43650 City Clerk - Contract Services 150.00 0.00 0.00 0.00 150.00 100.00% 102 - CityClerk Totals: 18,475.00 294.44 1,219.52 1,513.96 16,961.04 91.81% Department: 104 - CityManager
080-104-40000 Salaries-CityManager 64,269.00 1,871.18 3,923.19 5,794.37 58,474.63 90.98% 080-104-40015 VacationPayout-CityManager 2,375.00 0.00 0.00 0.00 2,375.00 100.00% 080-104-40050 FICA-CityManager 3,985.00 116.01 239.03 355.04 3,629.96 91.09% 080-104-40051 Medicare-CityManager 932.00 27.13 55.90 83.03 848.97 91.09% 080-104-40055 SUI-CityManager 105.00 0.00 0.00 0.00 105.00 100.00% 525
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 14 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 080-104-40060 PERS-CityManager 4,351.00 148.94 306.32 455.26 3,895.74 89.54% 080-104-40065 EmployeeBenefi-CityManager 12,449.00 852.00 1,258.17 2,110.17 10,338.83 83.05% 080-104-40070 WorkersComp.-CityManager 3,010.00 0.00 784.00 784.00 2,226.00 73.95% 080-104-42015 Gen.Supplies-CityManager 250.00 0.00 0.00 0.00 250.00 100.00% 080-104-42760 Travel,Conf,Trg-CITYMANAGER 625.00 0.00 0.00 0.00 625.00 100.00% 080-104-42805 WaterUtilities-CityManager 149.00 0.00 0.00 0.00 149.00 100.00% 080-104-42810 PG&EUtilities-CityManager 300.00 0.00 1.61 1.61 298.39 99.46% 080-104-42995 CONTINGENCY-CityManager 5,000.00 0.00 0.00 0.00 5,000.00 100.00% 080-104-43600 ProfServices-CityManager 1,875.00 0.00 0.00 0.00 1,875.00 100.00% 104 - CityManager Totals: 99,675.00 3,015.26 6,568.22 9,583.48 90,091.52 90.39% Department: 105 - Finance
080-105-40000 Salaries-Finance 24,877.00 468.50 225.06 693.56 24,183.44 97.21% 080-105-40015 VACATIONPAYOUT-Finance 592.00 0.00 0.00 0.00 592.00 100.00% 080-105-40050 FICA-Finance 1,542.00 29.04 13.94 42.98 1,499.02 97.21% 080-105-40051 Medicare-Finance 361.00 6.80 3.25 10.05 350.95 97.22% 080-105-40055 SUI-Finance 98.00 2.59 0.00 2.59 95.41 97.36% 080-105-40060 PERS-Finance 1,549.00 37.29 17.91 55.20 1,493.80 96.44% 080-105-40065 EmployeeBenefi-Finance 5,785.00 226.43 275.52 501.95 5,283.05 91.32% 080-105-40070 WorkersComp.-Finance 2,797.00 0.00 753.00 753.00 2,044.00 73.08% 080-105-42015 Gen.Supplies-Finance 2,905.00 0.00 24.06 24.06 2,880.94 99.17% 080-105-42435 NetworkSvcsCo-Finance 6,390.00 0.00 70.00 70.00 6,320.00 98.90% 080-105-42760 Travel,Conf,Trg-Finance 174.00 0.00 0.00 0.00 174.00 100.00% 080-105-42805 WaterUtilities-Finance 70.00 0.00 0.00 0.00 70.00 100.00% 080-105-42810 PG&EUtilities-Finance 755.00 0.00 51.14 51.14 703.86 93.23% 080-105-42955 PayChex&Bank-Finance 929.00 0.00 0.00 0.00 929.00 100.00% 080-105-43100 Audit&Acctg-Finance 4,705.00 0.00 0.00 0.00 4,705.00 100.00% 080-105-43600 ProfServices-Finance 581.00 0.00 0.00 0.00 581.00 100.00% 080-105-43650 Contracts-Other-Finance 232.00 0.00 0.00 0.00 232.00 100.00% 080-105-69400 O&MEquipment-Finance 581.00 0.00 0.00 0.00 581.00 100.00% 105 - Finance Totals: 54,923.00 770.65 1,433.88 2,204.53 52,718.47 95.99% Department: 160 - Effluent
080-160-40000 Salaries-SewerARSA 107,519.00 1,900.32 10,075.11 11,975.43 95,543.57 88.86% 080-160-40006 Overtime-SewerARSA 10,000.00 5,008.18 846.48 5,854.66 4,145.34 41.45% 080-160-40015 VacationPayout-Effluent 3,756.00 0.00 0.00 0.00 3,756.00 100.00% 080-160-40050 FICA-SewerARSA 6,666.00 418.34 643.82 1,062.16 5,603.84 84.07% 080-160-40051 Medicare-SewerARSA 1,559.00 97.84 150.59 248.43 1,310.57 84.06% 080-160-40055 SUI-SewerARSA 311.00 0.00 0.00 0.00 311.00 100.00% 080-160-40060 PERS-SewerARSA 13,107.00 868.48 1,479.37 2,347.85 10,759.15 82.09% 080-160-40061 PERSUnfunded-Effluent 62,733.00 0.00 0.00 0.00 62,733.00 100.00% 080-160-40065 Health/LifeIns-SewerARSA 31,641.00 2,133.44 5,772.58 7,906.02 23,734.98 75.01% 080-160-40070 WorkersComp.-SewerARSA 8,925.00 0.00 2,325.00 2,325.00 6,600.00 73.95% 080-160-42016 Gen.Supplies-SewerARSA 1,600.00 0.00 0.00 0.00 1,600.00 100.00% 080-160-42020 FUEL-SewerARSA 12,000.00 0.00 0.00 0.00 12,000.00 100.00% 526
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 15 of 16
Account Name Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 080-160-42030 Repair/Maint-SewerARSA 15,000.00 0.00 151.88 151.88 14,848.12 98.99% 080-160-42405 FloodControl-SewerARSA 1,000.00 0.00 0.00 0.00 1,000.00 100.00% 080-160-42425 Taxes/Fees/Lics-SewerARSA 67,000.00 0.00 0.00 0.00 67,000.00 100.00% 080-160-42850 VehicleMaintna-SewerARSA 5,000.00 0.00 0.00 0.00 5,000.00 100.00% 080-160-42860 O&MBlg/Structu-SewerARSA 2,000.00 0.00 0.00 0.00 2,000.00 100.00% 080-160-42900 ARSA-SewerARSA 50,000.00 0.00 0.00 0.00 50,000.00 100.00% 080-160-43250 Engineering-SewerARSA 80,000.00 0.00 0.00 0.00 80,000.00 100.00% 080-160-43350 Speciallegal-SewerARSA 15,000.00 0.00 0.00 0.00 15,000.00 100.00% 080-160-69400 O&MEquipment-SewerARSA 35,000.00 0.00 0.00 0.00 35,000.00 100.00% 080-160-69600 Improvements-SewerARSA 825,000.00 0.00 0.00 0.00 825,000.00 100.00% 160 - Effluent Totals: 1,354,817.00 10,426.60 21,444.83 31,871.43 1,322,945.57 97.65% Department: 610 - CentralServices
080-610-40065 EmployeeBenefi-CentralServies 1,275.00 0.00 0.00 0.00 1,275.00 100.00% 080-610-42015 Gen.Supplies-CentralServies 600.00 0.00 0.00 0.00 600.00 100.00% 080-610-42031 EquipmtMaint.-CentralServies 300.00 0.00 0.00 0.00 300.00 100.00% 080-610-42435 NetworkSvcsCo-CentralServies 9,000.00 0.00 0.00 0.00 9,000.00 100.00% 080-610-42436 InternetServic-CentralServies 3,000.00 0.00 0.00 0.00 3,000.00 100.00% 080-610-42710 Communications-CentralServies 1,500.00 0.00 0.00 0.00 1,500.00 100.00% 080-610-42755 RiskManagement-CentralServies 160,500.00 0.00 101,161.00 101,161.00 59,339.00 36.97% 080-610-42756 Membership/Dues-CentralServies 750.00 0.00 0.00 0.00 750.00 100.00% 080-610-69800 ComputerHardwr-CentralServies 300.00 0.00 0.00 0.00 300.00 100.00% 610 - CentralServices Totals: 177,225.00 0.00 101,161.00 101,161.00 76,064.00 42.92% Department: 613 - CityAttorney
080-613-43350 Legal-CityAttorney 27,500.00 0.00 0.00 0.00 27,500.00 100.00% 613 - CityAttorney Totals: 27,500.00 0.00 0.00 0.00 27,500.00 100.00% 080 - EffluentDisp. Totals: 1,732,615.00 14,506.95 131,827.45 146,334.40 1,586,280.60 91.55% Report Total: -222,872.00 -22,090.38 443,675.43 421,585.05 -644,457.05 527
Section 13, Item I.

Detail vs Budget Report Date Range: 08/01/2025 - 08/31/2025 9/10/2025 12:13:07 PM Page 16 of 16
Fund Summary
Fund Fiscal Budget Beginning Balance Total Activity Ending Balance Budget Remaining % Remaining 001 - GeneralFund -394,703.00 228,248.54 206,525.88 434,774.42 -829,477.42 003 - Streets/Sidewal 116,945.00 -4,010.09 168.47 -3,841.62 120,786.62 004 - CrestviewLgt/D 20,892.00 56.74 463.48 520.22 20,371.78 010 - SewerM&O -1,895,591.00 -135,892.52 109,193.02 -26,699.50 -1,868,891.50 011 - SewerWWTP -7,000.00 -12,500.00 -6,250.00 -18,750.00 11,750.00 167.86% 012 - SewerLineRep. -7,000.00 0.00 0.00 0.00 -7,000.00 -100.00% 014 - SewerCapRes -11,000.00 0.00 0.00 0.00 -11,000.00 -100.00% 042 - AB1600 63,671.00 0.00 0.00 0.00 63,671.00
059 - BuildingFacili 0.00 0.00 1,747.13 1,747.13 -1,747.13 0.00% 073 - ParkImpactFee 158,299.00 -112,500.00 0.00 -112,500.00 270,799.00 080 - EffluentDisp. 1,732,615.00 14,506.95 131,827.45 146,334.40 1,586,280.60 91.55% Report Total: -222,872.00 -22,090.38 443,675.43 421,585.05 -644,457.05 528
Section 13, Item I.
9/10/2025 12:28:51 PM Page 1 of 12
Expense Approval Report
By Vendor Name
Payment Dates 8/1/2025 - 8/31/2025
Vendor Name Payment Date Description (Item) Amount
Vendor: ABC03 - ABC AUTO GLASS, INC. DBA
ABC AUTO GLASS, INC. DBA 08/15/2025 Windshield 442.09
Vendor ABC03 - ABC AUTO GLASS, INC. DBA Total: 442.09
Vendor: ABS01 - ABSO TECHNOLOGIES
ABSO TECHNOLOGIES 08/15/2025 IT 909.00
ABSO TECHNOLOGIES 08/15/2025 IT 909.00
Vendor ABS01 - ABSO TECHNOLOGIES Total: 1,818.00
Vendor: ACC03 - ACC BUSINESS
ACC BUSINESS 08/15/2025 Internet 375.98
ACC BUSINESS 08/15/2025 Internet 375.98
Vendor ACC03 - ACC BUSINESS Total: 751.96
Vendor: AMA08 - Amador Co Sheriff's Dept
Amador Co Sheriff's Dept 08/15/2025 Mobile Data Service 429.85 Amador Co Sheriff's Dept 08/15/2025 Dispatch Fourth Quarter 24/… 37,201.75 Vendor AMA08 - Amador Co Sheriff's Dept Total: 37,631.60 Vendor: AME15 - AMERICAN FIDELITY ASSURAN
AMERICAN FIDELITY ASSURAN 08/15/2025 GF City Clerk 43.20 AMERICAN FIDELITY ASSURAN 08/15/2025 Police 651.61
AMERICAN FIDELITY ASSURAN 08/15/2025 Parks & Rec 149.20 AMERICAN FIDELITY ASSURAN 08/15/2025 Streets 71.61
AMERICAN FIDELITY ASSURAN 08/15/2025 WTTP City Clerk 18.00 AMERICAN FIDELITY ASSURAN 08/15/2025 Treatment Plant 131.29 AMERICAN FIDELITY ASSURAN 08/15/2025 Collections 119.36 AMERICAN FIDELITY ASSURAN 08/15/2025 Effluent/Clerk 10.80 AMERICAN FIDELITY ASSURAN 08/15/2025 Effluent 125.32
Vendor AME15 - AMERICAN FIDELITY ASSURAN Total: 1,320.39 Vendor: AME14 - AMERICAN FIDELITY HEALTH
AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 268.74 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 397.91 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 36.81 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 199.50 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 8.00 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 287.48 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 89.58 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 159.16 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 310.06 529
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 2 of 12
Vendor Name Payment Date Description (Item) Amount
AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 88.40 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 81.66 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 159.16 AMERICAN FIDELITY HEALTH 08/15/2025 HSA Premiums August 2025 210.00 Vendor AME14 - AMERICAN FIDELITY HEALTH Total: 2,296.46 Vendor: QUA02 - AQUALITY WATER MANAGEMENT
AQUALITY WATER MANAGE… 08/15/2025 Water Management 5,338.50 Vendor QUA02 - AQUALITY WATER MANAGEMENT Total: 5,338.50 Vendor: AT&T2 - AT&T CALNET 3
AT&T CALNET 3 08/15/2025 Phone Service 31.65
AT&T CALNET 3 08/15/2025 Phone Services 64.03
Vendor AT&T2 - AT&T CALNET 3 Total: 95.68
Vendor: BLU04 - BlueTriton Brands Inc
BlueTriton Brands Inc 08/15/2025 Drinking Water 31.54
BlueTriton Brands Inc 08/15/2025 Drinking Water 61.84
BlueTriton Brands Inc 08/15/2025 Drinking Water 5.57
BlueTriton Brands Inc 08/15/2025 Drinking Water 19.79
BlueTriton Brands Inc 08/15/2025 Drinking Water 4.93
Vendor BLU04 - BlueTriton Brands Inc Total: 123.67
Vendor: JAC01 - Brusatori Enterprises Inc
Brusatori Enterprises Inc 08/15/2025 Auto Maintenance/Service 141.60 Brusatori Enterprises Inc 08/15/2025 Evidence Tow 425.00 Brusatori Enterprises Inc 08/15/2025 Auto Repairs/Services 97.69 Vendor JAC01 - Brusatori Enterprises Inc Total: 664.29
Vendor: CAL34 - CALAVERAS ENTERPRISE & SI
CALAVERAS ENTERPRISE & SI 08/15/2025 Classified Ad 176.64 Vendor CAL34 - CALAVERAS ENTERPRISE & SI Total: 176.64
Vendor: CAL39 - CALIFORNIA CONSULTING, IN
CALIFORNIA CONSULTING, IN 08/15/2025 Grant Writing Services 600.00 Vendor CAL39 - CALIFORNIA CONSULTING, IN Total: 600.00
Vendor: CEN02 - Central S.J.Valley RiskMg
Central S.J.Valley RiskMg 08/15/2025 Workers Comp 941.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 1,098.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,572.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 9,408.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,760.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 134,882.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 157.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 376.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 1,294.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 392.00 530
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 3 of 12
Vendor Name Payment Date Description (Item) Amount
Central S.J.Valley RiskMg 08/15/2025 Workers Comp 1,098.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,572.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,409.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,189.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 101,162.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 235.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 784.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 753.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 2,325.00 Central S.J.Valley RiskMg 08/15/2025 Workers Comp 101,161.00 Vendor CEN02 - Central S.J.Valley RiskMg Total: 368,568.00 Vendor: CAR16 - CHRISTIAN CARDONA
CHRISTIAN CARDONA 08/15/2025 Monthly Social Media 500.00 Vendor CAR16 - CHRISTIAN CARDONA Total: 500.00
Vendor: COT01 - COLE HUBER LLP
COLE HUBER LLP 08/15/2025 Balance Due 527.84
COLE HUBER LLP 08/15/2025 Balance Due 527.83
COLE HUBER LLP 08/15/2025 Balance Due 1,120.00
COLE HUBER LLP 08/15/2025 Balance Due 1,120.00
Vendor COT01 - COLE HUBER LLP Total: 3,295.67
Vendor: COM16 - COMCAST BUSINESS
COMCAST BUSINESS 08/15/2025 Business Internet 186.35
Vendor COM16 - COMCAST BUSINESS Total: 186.35
Vendor: COR01 - Corbin Willits Systems, I
Corbin Willits Systems, I 08/15/2025 Financial Software 446.25 Corbin Willits Systems, I 08/15/2025 Financial Software 78.75 Corbin Willits Systems, I 08/15/2025 Financial Software 280.00 Corbin Willits Systems, I 08/15/2025 Financial Software 70.00 Vendor COR01 - Corbin Willits Systems, I Total: 875.00
Vendor: DEP11 - Dept of Transportation
Dept of Transportation 08/15/2025 Signals/Lighting 1,388.34 Vendor DEP11 - Dept of Transportation Total: 1,388.34
Vendor: FER02 - FERGUSON ENTER,INC.#686
FERGUSON ENTER,INC.#686 08/15/2025 Plumbing Supplies 35.46 Vendor FER02 - FERGUSON ENTER,INC.#686 Total: 35.46
Vendor: GEO03 - GEOCON CONSULTANTS, INC
GEOCON CONSULTANTS, INC 08/15/2025 Geotechnical Investigation 625.00 Vendor GEO03 - GEOCON CONSULTANTS, INC Total: 625.00
Vendor: HAU02 - HAUGE BRUECK ASSOCIATES,
HAUGE BRUECK ASSOCIATES, 08/15/2025 Planner 3,440.00
HAUGE BRUECK ASSOCIATES, 08/15/2025 Sutter Creek Ranch (Gold Ru… 50.00 531
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 4 of 12
Vendor Name Payment Date Description (Item) Amount
HAUGE BRUECK ASSOCIATES, 08/15/2025 Panner Creek Trafalgar Inc P… 216.00 HAUGE BRUECK ASSOCIATES, 08/15/2025 130 Lincoln- Price P167 80.00 HAUGE BRUECK ASSOCIATES, 08/15/2025 90 Badger St Galle P171 16.00 HAUGE BRUECK ASSOCIATES, 08/15/2025 110 Gold Dust Trail P176 160.00 Vendor HAU02 - HAUGE BRUECK ASSOCIATES, Total: 3,962.00 Vendor: HAV01 - HAVENS, MATTHEW A.

HAVENS, MATTHEW A. 08/15/2025 Harness Headlight Bulb 22.52 Vendor HAV01 - HAVENS, MATTHEW A. Total: 22.52
Vendor: BOI02 - Heidi A Boitano
Heidi A Boitano 08/15/2025 Parking Lot Lease 2,915.46
Vendor BOI02 - Heidi A Boitano Total: 2,915.46
Vendor: HUN04 - HUNT & SONS, INC
HUNT & SONS, INC 08/15/2025 Fuel 1,006.48
HUNT & SONS, INC 08/15/2025 Fuel 363.42
HUNT & SONS, INC 08/15/2025 Fuel 303.37
HUNT & SONS, INC 08/15/2025 Fuel 123.58
HUNT & SONS, INC 08/15/2025 Fuel 1,179.47
HUNT & SONS, INC 08/15/2025 Fuel 361.66
HUNT & SONS, INC 08/15/2025 Fuel 181.44
HUNT & SONS, INC 08/15/2025 Fuel 214.77
Vendor HUN04 - HUNT & SONS, INC Total: 3,734.19
Vendor: ITA01 - ITALIAN BENEVOLENT SOCIET
ITALIAN BENEVOLENT SOCIET 08/15/2025 Refund 3,531.82
Vendor ITA01 - ITALIAN BENEVOLENT SOCIET Total: 3,531.82 Vendor: OCO01 - James O'Connell
James O'Connell 08/15/2025 Gas Reimbursement 46.08
Vendor OCO01 - James O'Connell Total: 46.08
Vendor: KEE01 - KEENAN & ASSOCIATES/PACE
KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 2,633.70 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 627.72 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 772.30 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 2,464.21 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… -3,150.00 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 502.18 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 552.55 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 20.32 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 241.71 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 290.05 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 103.47 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 25.11 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 70.21 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 203.19 532
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 5 of 12
Vendor Name Payment Date Description (Item) Amount
KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 241.71 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 433.90 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 167.39 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 351.05 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 1,122.85 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 1,221.53 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 322.27 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 632.69 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 41.85 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 210.63 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 203.19 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 161.14 KEENAN & ASSOCIATES/PACE 08/15/2025 August 2025 Medical Premi… 1,740.49 Vendor KEE01 - KEENAN & ASSOCIATES/PACE Total: 12,207.41 Vendor: LED01 - Ledger Dispatch
Ledger Dispatch 08/15/2025 Subscription 80.00
Vendor LED01 - Ledger Dispatch Total: 80.00
Vendor: LES02 - LESLIE'S POOL SUPPLIES, I
LESLIE'S POOL SUPPLIES, I 08/15/2025 Chemicals 8,664.78 Vendor LES02 - LESLIE'S POOL SUPPLIES, I Total: 8,664.78 Vendor: LOW01 - LOWE'S BUSINESS ACCOUNT
LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 68.07 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 440.06 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 2,458.41 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 20.45 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 1,029.27 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 216.83 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 92.56 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 68.08 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 1,141.23 LOWE'S BUSINESS ACCOUNT 08/15/2025 Maintenance Supplies 151.88 Vendor LOW01 - LOWE'S BUSINESS ACCOUNT Total: 5,686.84
Vendor: MCM02 - MCMASTER-CARR SUPPLY CO
MCMASTER-CARR SUPPLY CO 08/15/2025 Maintenance Supplies 450.04 MCMASTER-CARR SUPPLY CO 08/15/2025 Maintenance Supplies 1,871.32 Vendor MCM02 - MCMASTER-CARR SUPPLY CO Total: 2,321.36
Vendor: MID05 - MidAmerica Admin & Retire
MidAmerica Admin & Retire 08/15/2025 Admin Fee 225.00
Vendor MID05 - MidAmerica Admin & Retire Total: 225.00
Vendor: MUT01 - MUTUAL OF OMAHA
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 63.25
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 220.40
533
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 6 of 12
Vendor Name Payment Date Description (Item) Amount
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 33.95
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 38.53
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 5.19
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 35.93
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 28.75
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 73.50
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 36.66
MUTUAL OF OMAHA 08/15/2025 LTD/STD Premiums 85.96
Vendor MUT01 - MUTUAL OF OMAHA Total: 622.12
Vendor: NAP01 - NAPA AUTO PARTS
NAPA AUTO PARTS 08/15/2025 Maintenance Supplies 179.29
Vendor NAP01 - NAPA AUTO PARTS Total: 179.29
Vendor: PAC02 - PG&E (Electric,Gas)
PG&E (Electric,Gas) 08/15/2025 4295 City Clerk 6.82
PG&E (Electric,Gas) 08/15/2025 4295 Admin Building 4.01 PG&E (Electric,Gas) 08/15/2025 4459 Finance Dept 325.99 PG&E (Electric,Gas) 08/15/2025 4459 Police 639.20
PG&E (Electric,Gas) 08/15/2025 8213 Community Building 1,519.94 PG&E (Electric,Gas) 08/15/2025 4459 Auditorium & City Hall 2,982.92 PG&E (Electric,Gas) 08/15/2025 7813 Public Restrooms 97.11 PG&E (Electric,Gas) 08/15/2025 8299 Little League Park 48.98 PG&E (Electric,Gas) 08/15/2025 5624 Community Building Gas 13.58 PG&E (Electric,Gas) 08/15/2025 0220 Monteverde Store 114.75 PG&E (Electric,Gas) 08/15/2025 4295 Admin Building 0.80 PG&E (Electric,Gas) 08/15/2025 4459 Finance DEpt 57.53
PG&E (Electric,Gas) 08/15/2025 1466 Flag Pole 34.98
PG&E (Electric,Gas) 08/15/2025 4585 Hwy 104/Bowers Dr 75.87 PG&E (Electric,Gas) 08/15/2025 4295 City Clerk 0.80
PG&E (Electric,Gas) 08/15/2025 4295 Admin Building 1.61 PG&E (Electric,Gas) 08/15/2025 4459 Finance Dept 204.54 PG&E (Electric,Gas) 08/15/2025 1605 Lift Station 81.86
PG&E (Electric,Gas) 08/15/2025 1290 WWTP Outside Lights 10.47 PG&E (Electric,Gas) 08/15/2025 7712 WWTP Office 415.93
PG&E (Electric,Gas) 08/15/2025 6648 WWTP 3,595.45
PG&E (Electric,Gas) 08/15/2025 9590 Historical Grammer Sc… 1,646.64 PG&E (Electric,Gas) 08/15/2025 4295 City Clerk 0.40
PG&E (Electric,Gas) 08/15/2025 4295 Admin Building 1.61 PG&E (Electric,Gas) 08/15/2025 4459 Finance Dept 51.14
Vendor PAC02 - PG&E (Electric,Gas) Total: 11,932.93
Vendor: PAC01 - PG&E (Lighting District)
PG&E (Lighting District) 08/15/2025 6305 Valley View/Bowers 60.74 PG&E (Lighting District) 08/15/2025 4283 Plaza Lighting 148.66 PG&E (Lighting District) 08/15/2025 9269 Main St 2,323.51 534
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 7 of 12
Vendor Name Payment Date Description (Item) Amount
PG&E (Lighting District) 08/15/2025 9669 Sutter Crest & Manor 404.26 PG&E (Lighting District) 08/15/2025 8388 Church St 151.81 PG&E (Lighting District) 08/15/2025 5017 Sierra West Business 173.65 PG&E (Lighting District) 08/15/2025 2944 Crestview Estates 125.88 Vendor PAC01 - PG&E (Lighting District) Total: 3,388.51 Vendor: PRI08 - PRINCIPAL LIFE INS. COMPA
PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 41.54 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 79.93 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 136.58 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 270.05 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 90.05 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 86.50 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 0.52 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 34.05 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 28.37 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 10.74 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 8.10 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 28.37 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 144.45 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 10.39 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 53.29 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 78.94 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 37.83 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 155.10 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 98.95 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 174.08 PRINCIPAL LIFE INS. COMPA 08/15/2025 Dental & Vision Premiums 37.83 Vendor PRI08 - PRINCIPAL LIFE INS. COMPA Total: 1,605.66 Vendor: SEI01 - SEIU Local 1021
SEIU Local 1021 08/15/2025 July 2025 Union Dues 333.09
Vendor SEI01 - SEIU Local 1021 Total: 333.09
Vendor: SIG01 - SIGNAL SERVICE
SIGNAL SERVICE 08/15/2025 Alarm Monitoring 601.17
Vendor SIG01 - SIGNAL SERVICE Total: 601.17
Vendor: SOR02 - Soracco, Inc
Soracco, Inc 08/15/2025 Misc Sewer Replacement Pro… 161,670.05 Vendor SOR02 - Soracco, Inc Total: 161,670.05
Vendor: THA02 - THATCHER COMPANY - LB1106
THATCHER COMPANY - LB11… 08/15/2025 2025250104084 3,869.28 THATCHER COMPANY - LB11… 08/15/2025 2025250103868 3,863.96 Vendor THA02 - THATCHER COMPANY - LB1106 Total: 7,733.24 535
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 8 of 12
Vendor Name Payment Date Description (Item) Amount
Vendor: TIR01 - TireHub, LLC
TireHub, LLC 08/15/2025 Tires 891.82
Vendor TIR01 - TireHub, LLC Total: 891.82
Vendor: TRA04 - TRANSUNION RISK & ALTERNA
TRANSUNION RISK & ALTER… 08/15/2025 Person Search 75.00 Vendor TRA04 - TRANSUNION RISK & ALTERNA Total: 75.00
Vendor: VIO01 - VIOLICH/SORACCO
VIOLICH/SORACCO 08/15/2025 Monthly Parking Lot Lease 885.00 Vendor VIO01 - VIOLICH/SORACCO Total: 885.00
Vendor: WEL06 - WELLS FARGO FINANCIAL LEA
WELLS FARGO FINANCIAL LEA 08/15/2025 Copier Lease 100.49 WELLS FARGO FINANCIAL LEA 08/15/2025 Copier Lease 19.14 WELLS FARGO FINANCIAL LEA 08/15/2025 Copier Lease 26.32 WELLS FARGO FINANCIAL LEA 08/15/2025 Copier Lease 74.17 WELLS FARGO FINANCIAL LEA 08/15/2025 Copier Lease 19.13 Vendor WEL06 - WELLS FARGO FINANCIAL LEA Total: 239.25
Grand Total: 660,287.69
536
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 9 of 12
Report Summary
Fund Summary
Fund Payment Amount
001 - GeneralFund 238,009.08
003 - Streets/Sidewal 8,844.83
004 - CrestviewLgt/D 125.88
010 - SewerM&O 302,843.23
059 - BuildingFacili 1,747.13
080 - EffluentDisp. 108,717.54
Grand Total: 660,287.69
Account Summary
Account Number Account Name Payment Amount
001-000-20480 P/R-MedicalHealthPay. 2,633.70
001-000-20490 P/R-S.C.EmployeesAsso 333.09
001-000-72220 SitePlans 3,531.82
001-102-40065 Health/LifeIns-CityClerk 981.20
001-102-40070 WorkersComp.-CityClerk 941.00
001-102-42810 PG&EUtilities-CityClerk 6.82
001-104-40065 Health/LifeIns-CITYMAN… 1,313.39
001-104-40070 WorkersComp.-CITYMA… 1,098.00
001-104-42810 PG&EUtilities-CityMana… 4.01
001-105-40065 Health/LifeIns-Finance 2,600.79
001-105-40070 WorkersComp.-Finance 2,572.00
001-105-42015 Gen.Supplies-Finance 200.10
001-105-42435 NetworkSvcsCo-Finance 446.25
001-105-42810 PG&EUtilities-Finance 325.99
001-106-40065 Health/LifeIns-PoliceDept -2,007.94
001-106-40070 WorkersComp.-PoliceDe… 9,408.00
001-106-42015 Gen.Supplies-PoliceDept 136.84
001-106-42020 FUEL-PoliceDept 2,185.95
001-106-42045 SpecialDepart-PoliceDept 471.08
001-106-42710 Communications-Police… 493.88
001-106-42810 PG&EUtilities-PoliceDept 639.20
001-106-42850 VehicleMaintna-PoliceD… 1,131.11
001-106-43700 Dispatching-PoliceDept 37,201.75
001-109-43450 Planner-Planning 3,440.00
001-111-42300 E&PReimbEngr.-Engineer… 522.00
001-113-40000 Salaries-Parks&Recreat 538.99
001-113-40060 PERS-Parks&Recreat 90.05
001-113-40065 Health/LifeIns-Parks&Re… 1,675.25
001-113-40070 WorkersComp.-Parks&R… 2,760.00
001-113-42020 FUEL-Parks&Recreat 725.08
537
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 10 of 12
Account Summary
Account Number Account Name Payment Amount
001-113-42030 Repair/Maint-Parks&Rec… 3,948.19
001-113-42205 Lease-Prkglot-Parks&Rec… 3,800.46
001-113-42810 PG&EUtilities-Parks&Rec… 4,662.53
001-113-42850 VehicleMaintna-Parks&… 860.73
001-113-42860 O&MBlg/Structu-Parks&… 601.17
001-114-40065 HealthBenefits-Swimmin… 127.40
001-114-42025 Supplies-Chem-Swimmi… 8,664.78
001-115-42055 CommunityProm-Promot… 500.00
001-140-40065 EmployeeBenefi-Cemete… 33.21
001-172-42810 PG&EUtilities-MonteVer… 114.75
001-610-40065 Health/LifeIns-CentralSe… 225.00
001-610-42436 InternetServic-CentralSe… 1,284.98
001-610-42710 Communications-Centra… 176.64
001-610-42755 RiskManagement-Centra… 134,882.00
001-610-42756 Membership/Dues-Cent… 80.00
001-613-43350 Speciallegal-LEGALSERVI… 1,647.84
003-104-40065 EmployeeBenefi-CityMa… 70.21
003-104-40070 WorkersComp.-CITYMA… 157.00
003-104-42810 PG&EUtilities-CityMana… 0.80
003-105-40065 EmployeeBenefi-Finance 203.19
003-105-40070 WorkersComp.-Finance 376.00
003-105-42015 Gen.Supplies-Finance 24.71
003-105-42435 NetworkSvcsCo-Finance 78.75
003-105-42810 PG&EUtilities-Finance 57.53
003-112-40000 Salaries-Streets/Roads 241.71
003-112-40065 Health/LifeIns-Streets/R… 1,001.74
003-112-40070 WorkersComp.-Streets/… 1,294.00
003-112-42020 FUEL-Streets/Roads 484.81
003-112-42030 Repair/Maint-Streets/Ro… 92.56
003-112-42800 PublicUtility-Streets/Roa… 60.74
003-112-42810 PG&EUtilities-Streets/Ro… 110.85
003-112-42815 StreetLights-Streets/Roa… 4,590.23
004-145-42815 StreetLights-CrestViewLgt 125.88
010-102-40065 Health/LifeIns-CityClerk 285.36
010-102-40070 WorkersComp.-CityClerk 392.00
010-102-42810 PG&EUtilities-CityClerk 0.80
010-104-40065 Health/LifeIns-CITYMAN… 592.25
010-104-40070 WorkersComp.-CityMan… 1,098.00
010-104-42810 PG&EUtilities-CityMana… 1.61
010-104-43600 ProfServices-CityManager 600.00
010-105-40065 Health/LifeIns-Finance 1,201.79
010-105-40070 WorkersComp.-Finance 2,572.00
538
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 11 of 12
Account Summary
Account Number Account Name Payment Amount
010-105-42015 Gen.Supplies-Finance 87.87
010-105-42435 NetworkSvcsCo-Finance 280.00
010-105-42810 PG&EUtilities-Finance 204.54
010-151-40000 Salaries-SewerTreatment 37.83
010-151-40065 Health/LifeIns-SewerTre… 2,213.75
010-151-40070 WorkersComp.-SewerTr… 2,409.00
010-151-42020 FUEL-SewerTreatment 338.35
010-151-42025 Supplies-Chem-SewerTr… 7,733.24
010-151-42436 InternetServic-SewerTre… 186.35
010-151-42710 Communications-SewerT… 31.65
010-151-42810 PG&EUtilities-SewerTrea… 4,103.71
010-151-42830 O&M-SewerPlt-SewerTr… 3,498.05
010-151-43650 Contracts-Other-SewerT… 5,338.50
010-151-69701 Machinery&-SewerTrea… 625.00
010-152-40000 Salaries-SewerCollectio 88.40
010-152-40065 Health/LifeIns-SewerColl… 969.32
010-152-40070 WorkersComp.-SewerCol… 2,189.00
010-152-69600 Improvements-SewerCol… 161,670.05
010-610-42435 NetworkSvcsCo-CentralS… 909.00
010-610-42436 InternetServic-CentralSe… 375.98
010-610-42755 RiskManagement-Centra… 101,162.00
010-613-43350 Speciallegal-LEGALSERVI… 1,647.83
059-105-42015 Gen.Supplies-Finance 100.49
059-113-42810 PG&EUtilities-Parks&Rec… 1,646.64
080-102-40065 EmployeeBenefi-CityClerk 52.65
080-102-40070 WorkersComp.-CityClerk 235.00
080-102-42810 PG&EUtilities-CityClerk 0.40
080-104-40065 EmployeeBenefi-CityMa… 369.79
080-104-40070 WorkersComp.-CityMan… 784.00
080-104-42810 PG&EUtilities-CityMana… 1.61
080-105-40065 EmployeeBenefi-Finance 203.19
080-105-40070 WorkersComp.-Finance 753.00
080-105-42015 Gen.Supplies-Finance 24.06
080-105-42435 NetworkSvcsCo-Finance 70.00
080-105-42810 PG&EUtilities-Finance 51.14
080-160-40060 PERS-SewerARSA 161.14
080-160-40065 Health/LifeIns-SewerAR… 2,373.68
080-160-40070 WorkersComp.-SewerAR… 2,325.00
080-160-42030 Repair/Maint-SewerARSA 151.88
080-610-42755 RiskManagement-Centra… 101,161.00
Grand Total: 660,287.69
539
Section 13, Item J.

Expense Approval Report Payment Dates: 8/1/2025 - 8/31/2025 9/10/2025 12:28:51 PM Page 12 of 12
Project Account Summary
Project Account Key Payment Amount
**None** 660,287.69
Grand Total: 660,287.69
540
Section 13, Item J.

TOTAL 5390849.31 ‐417772.2 4973077.11
095‐000‐10001 General Operating Reserve ‐ Claim On Cash 250880.54 0 250880.54 096‐000‐10001 General Capital Reserve ‐ Claim On Cash 51695.52 0 51695.52 093‐000‐10001 Vehicle Capital Reserve ‐ Claim On Cash 18290.17 0 18290.17 094‐000‐10001 Vacation Cashout Reserve ‐ Claim On Cash 51636.64 0 51636.64 091‐000‐10001 Road Capital Improvement Plan ‐ Claim On Cash ‐483270.11 0 ‐483270.11 092‐000‐10001 Pension & Insurance Reserve ‐ Claim On Cash 141931.47 0 141931.47 088‐000‐10001 City Council ‐ Claim On Cash 21400.09 0 21400.09 089‐000‐10001 Capital Improvement Plan ‐ Claim On Cash 85539.62 0 85539.62 086‐000‐10001 General Fund Capital Reserve ‐ Claim On Cash 75006.17 0 75006.17 087‐000‐10001 Refuse ‐ Claim On Cash 3490.33 0 3490.33
080‐000‐10001 Effluent Disposal/ARSA ‐ Claim On Cash ‐902667.5 ‐131827.45 ‐1034494.95 081‐000‐10001 Visitor Center ‐ Claim On Cash ‐0.13 0 ‐0.13 060‐000‐10001 Bypass Mitigation ‐ Claim On Cash 91.72 0 91.72 073‐000‐10001 Park Impact Fees ‐ Claim On Cash 224650.15 0 224650.15 057‐000‐10001 CA HOME Grant ‐ Claim On Cash 191965.32 0 191965.32 059‐000‐10001 Building Facilities ‐ Claim On Cash 4875.06 ‐1747.13 3127.93 050‐000‐10001 COPS Fast Prog ‐ Claim On Cash 2753.6 0 2753.6 055‐000‐10001 SC Bridge Replacement ‐ Claim On Cash ‐253806 0 ‐253806 047‐000‐10001 Grants ‐ Claim On Cash 56471.58 0 56471.58 048‐000‐10001 COVID‐19 ‐ Claim On Cash 1248.41 0 1248.41 039‐000‐10001 General Fund Operating Reserve ‐ Claim On Cash 387226.51 0 387226.51 042‐000‐10001 AB1600 Impact Fees ‐ Claim On Cash 156172.27 0 156172.27 037‐000‐10001 Parking in Lieu ‐ Claim On Cash 67930.91 0 67930.91 038‐000‐10001 Fire Service ‐ Claim On Cash 41719.9 0 41719.9 035‐000‐10001 General Traffic Mitigation ‐ Claim On Cash 251823.35 0 251823.35 036‐000‐10001 Regional Traffic Mitigation ‐ Claim On Cash 1835.93 0 1835.93 033‐000‐10001 TM ‐ Sutter Ione ‐ Claim On Cash ‐38262.17 0 ‐38262.17 034‐000‐10001 TM ‐ Hwy 49/Bypass ‐ Claim On Cash 63131.43 0 63131.43 031‐000‐10001 TM ‐ Sutter Hill ‐ Claim on Cash 84615.18 0 84615.18 032‐000‐10001 TM ‐ Crestview ‐ Claim On Cash ‐21917.55 0 ‐21917.55 029‐000‐10001 Swimming Pool ‐ Claim On Cash ‐36346.79 0 ‐36346.79 030‐000‐10001 TM ‐ Crest/Gopher ‐ Claim On Cash ‐77709.52 0 ‐77709.52 026‐000‐10001 COSC Com Fac ‐ Claim On Cash 991.22 0 991.22 028‐000‐10001 Public Safety Wellness Grant ‐ Claim On Cash 12431.15 0 12431.15 023‐000‐10001 General Fixed Assets ‐ Claim On Cash ‐563168 0 ‐563168 024‐000‐10001 Long Term Debt ‐ Claim On Cash ‐22410 0 ‐22410 017‐000‐10001 Monteverde Store ‐ Claim On Cash 167.29 0 167.29 019‐000‐10001 Knights Foundry ‐ Claim On Cash 2982.12 0 2982.12 014‐000‐10001 Sewer Capital Reserve ‐ Claim On Cash 1022647.25 0 1022647.25 015‐000‐10001 Sewer Debt Service ‐ Claim On Cash 0.43 0 0.43 011‐000‐10001 Sewer WWTP Capital Reserve ‐ Claim On Cash 148047.96 6250 154297.96 012‐000‐10001 Sewer Collections Capital Reserve ‐ Claim On Cash 631375.17 0 631375.17 009‐000‐10001 HMGP Hazard Mitigation ‐ Claim On Cash 1266.49 0 1266.49 010‐000‐10001 Sewer Operating ‐ Claim On Cash 3103285.9 ‐68644.51 3034641.39 004‐000‐10001 Crestview LD ‐ Claim On Cash 77.56 ‐463.48 ‐385.92 007‐000‐10001 Cemetery ‐ Claim On Cash ‐191.9 0 ‐191.9

CLAIM ON CASH
001‐000‐10001 General Fund ‐ Claim On Cash 577758.9 ‐219782.82 357976.08 003‐000‐10001 Streets ‐ Claim On Cash 53185.67 ‐1556.81 51628.86 Pooled Cash Report
For the Period Ending 8/31/2025

BEGINNING

BALANCE

CURRENT

ACTIVITY

CURRENT
BALANCE ACCOUNT # ACCOUNT NAME
541
Section 13, Item K.