Cities Index.
Agenda

Temecula City Council
September 22, 2026

Document
Agenda
Meeting
September 22, 2026
Body
Temecula City Council
Pages
12
Original file
483 KB
Text extracted from the city's file for reading and search. Open the original on laserfiche.temeculaca.gov. That file is the official record.

Assigned Planner Approval
PA Number Project Address APN Apply Date Date
Applicant Company
Owner Plan Type
Status
PA26-0317 28601 Old Town Front St, C, 922-036-038 Marcella Mills 08/05/2026 Allison Angelillo
ZIP THIRD INV PL Public
Plan Review
D, E
Convenience or
Temecula, CA 92590
Necessity
Application
Case Title / Description: Tecovas Type 40 PCN: A Public Convenience or Necessity Application for Tecovas retail store to obtain a Type 40 ABC License (On -Sale Beer) to serve customers one complimentary can or bottle of beer while they are shopping, to provide an elevated shopping experience. (AUP application PA26-0316)
PA26-0318 28718 Old Town Front St 922-072-022 Deeah Riley 08/05/2026 Bhupeshkumar
PL Temporary
Cancelled
Temecula, CA 92590
Patel
Use Permit
Case Title / Description: Tent TUP: A Temporary Use Permit for a Family event with a 35 ft x 40 ft tent located at the Southeast rear location outside the building from 8/4/26 to 8/7/26. No food, drink or music.

PA26-0326 40820 Winchester Rd 910-420-030 Julie Nard 08/10/2026 Stefanos
Temecula Towne PL Temporary
Plan Review
Temecula, CA 92591
Georgousopoulos
Center Assoc Use Permit
Case Title / Description: 2026 Greek Festival TUP: ATemporary Use Permit to allow a Greek Festival that includes vendors, food, alcohol, and live entertainment to take place at the Promenade Mall on October 16, 2026, from 5:00 PM to 10:00 PM, October 17, 2026, from 11:00 AM to 10:00 PM and October 18, 2026, from 11:00 AM to 10:00 PM. The project is located at the parking lot north of 40820 Winchester Road.

PA26-0328 41950 4Th St 922-034-020 Yannin Marquez 08/10/2026 Kirk Medeiros
TV Old Town LP PL Temporary
Approved
Temecula, CA 92592
Use Permit
Case Title / Description: 4th St. Hotel TUP: ATemporary Use Permit for a construction yard for building material storage for a period of six months located approximately 50 feet southwest of Mercedes Street on the south side of 4th Street.

PA26-0329 39947 Sweet Brier Cir 920-170-010 Julie Nard 08/11/2026 Donald Ramos
Donald Ramos PLAccessory
Plan Review
Temecula, CA 92591
Dwelling Unit
Case Title / Description: Ramos Residence ADU: An Accessory Dwelling Unit application for an approximately 1,200 square foot attached ADU to be added to an existing residence located at 39947 Sweet Brier Circle.

PA26-0330 30592 Jedediah Smith Rd 945-160-006 Yannin Marquez 08/11/2026 Susan Whitten
Temecula Valley PL Temporary
Plan Review
Temecula, CA 92592
Rose Society Use Permit
Case Title / Description: Rose Haven Heritage Garden TUP: A Temporary Use Permit for Rose Haven Heritage Garden's 35th Anniversary Celebration that includes live entertainment, vendors and food trucks.

This celebration will be on October 17, 2026, from 7:30 AM to 4:30 PM and October 18, 2026, from 11:00 AM to 4:30 PM located at 30592 Jedediah Smith Road.

Page 2 of 6 ends

Assigned Planner Approval
PA Number Project Address APN Apply Date Date Applicant Company Owner Plan Type Status PA26-0331 40750 Winchester Rd 910-420-030 Julie Nard 08/11/2026 Zachary Elliott Temecula Towne PL Temporary Plan Review Temecula, CA 92591 Center Assoc Use Permit
Case Title / Description: Fusion Church Inc TUP: ATemporary Use Permit for Fusion Church to hold church services at Regal Edwards Temecula on Sunday's from 8 AM - 12 PM.

PA26-0334 28975 Old Town Front St 922-110-042 Julie Nard 08/11/2026 Angel Towers BBG
28795 PL Zoning or Plan Review
Temecula, CA 92590
VENTURES Planning Letter
Case Title / Description: 28975 Old Town Front Street ZL: A Zoning Letter Request for the property located at 28975 Old Town Front Street (APN 922-110-042)
PA26-0343 28636 Old Town Front St 922-034-036 Eric Jones 08/13/2026 Andrew Doty
Front & Main PL Entertainment Approved
Temecula, CA 92590
License
Case Title / Description: The Vibe Live Music Type IV Entertainment License: A Type IV Entertainment License to allow the Vibe to conduct live music. The project is located at 28636 Old Town front Street.

PA26-0344 43500 Altair Vista 940-320-016 Scott Cooper 08/13/2026 Colin Koch
SB ALTAIR PL Modifications Approved
Temecula, CA 92590
Case Title / Description: Altair Recreation Center MOD: A Modification to a previously approved Development Plan (PA24-0363) for removal of an awning, addition of decorative screening, and a revised paint scheme of the Altair private Recreation Center .

PA26-0345 42146 6Th St 922-053-037 Yannin Marquez 08/14/2026 Audi Yousef
TEMECULA PL Modifications Approved
Temecula, CA 92590

TOWNHOME
Case Title / Description: Amissa Village Development Plan MOD: A Minor Modification to amend the previously approved development plan conditions of approval (PA22-0941) to include public works conditions of approval for the project located at 42146 6th Street.

PA26-0346 42146 6Th St 922-053-037 Yannin Marquez 08/14/2026 Audi Yousef TEMECULA PL Modifications Approved Temecula, CA 92590 TOWNHOME
Case Title / Description: Amissa Village Condo Map MOD: A Minor Modification Application to amend the previously approved condominium map (PA22-1123) to include public works conditions of approval for the project located at 42146 6th Street.

PA26-0347 957-080-027 Yannin Marquez 08/17/2026 Maile Macabio CARDINAL INV PL Modifications Plan Review Temecula, CA PROP-SERAPHI
NA
Case Title / Description: Oak Creek Wall and Fence MOD: A Modification Application to change wall and fence materials and locations for the residential tract development located on the southeast corner of Joseph Road and Rita Way.

Page 3 of 6 ends

PA Number Project Address
PA26-0348 32997 De Portola Rd
Temecula, CA 92592
Assigned Planner
APN Apply Date
959-400-001 Yannin Marquez 08/17/2026
Approval
Date Applicant Company Owner Plan Type Status
Nicole Balchunas Taylor Morrison PL Modifications Approved of California, LLC
Case Title / Description: Elderberry Park Rec Center and Tract Wall and Fence MOD: A Modification Application for modifications to a pool storage building to bring to building code compliance and include additional details to the wall and fence plans of Elderberry Park located at the northwest corner of Butterfield Stage Road and Temecula Parkway.

PA26-0349 41770 Margarita Rd 921-330-033 08/17/2026
Sara Zoll
Packer Pointe
PL Modifications Plan Review
Temecula, CA 92591
Case Title / Description: Sycamore Terrace Apartments Turf Replacement MOD: A Modification Application for the removal of turf and replacement with water efficient landscape, planted decorative cobble swale, and decorative fencing along property frontage.

PA26-0351 28765 Single Oak Dr 921-020-042 Yannin Marquez 08/20/2026 Mark Bailey Signarama

TEMECULA
PL Sign Program Plan Review
Temecula, CA 92590
OAKS

BUSINESS
PARK
Case Title / Description: Temecula Business Center Sign Program No. 131 SPA: A Sign Program Amendment Application to the Temecula Business Center Sign Program No. 131 to include additional allowable materials to use for wall mounted signs. The amendment is proposed to be used for a new wall mounted sign located at 28765 Single Oak Drive, Suite 140.

PA26-0353 30530 Rancho California Rd 921-700-010 Julie Nand 08/20/2026 Queeny Fils
B 10 MOUNTAIN
PL Zoning or Plan Review
Temecula, CA 92591
B SD
Planning Letter
Case Title / Description: Palomar Village ZL: A Zoning Letter Request for 30640, 30550, 30530, 30520, 30680, 30670 Rancho California Road (APNs: 921-700-015, 921-700-009, 921-700-010, 921-700-011, 921-700-016,921-700-005)
PA26-0354 32183 Daybrook Terrace 964-760-011 Julie Nand 08/20/2026 Jaime Grajeda
Michael Prosser
PL Modifications Plan Review
Temecula, CA 92591
Case Title / Description: Patio Cover and Pool Cover MOD: A Modification Application for the addition of a 23-foot by13-foot stucco patio cover fixated to the residence, and a 10-foot by 17-foot stucco and wood pool patio cover detached from the residence.

PA26-0355 957-080-027 Yannin Marquez 08/20/2026
Carey Adams

CARDINAL INV
PI -Temporary Plan Review
Temecula, CA

PROP-SERAPHI
Use Permit
NA
Case Title / Description: Oak Creek MHC: A Model Home Complex for Oak Creek three (3) model homes (lots 63, 64, 65), sales office in garage of lot 65 and parking lot, accessible restroom and wash station on lot

66.

Page 4 of 6 ends

Assigned Planner Approval
PA Number Project Address APN Apply Date Date
Applicant Company
Owner
Plan Type Status
PA26-0357 27625 Jefferson Ave 921-480-048 08/25/2026
Nick Prestininzi
Robbins &
PL Modifications Plan Review
Temecula, CA 92590
Associates
Case Title / Description: Greenleaf Rent a Car & Leasing MOD: A Modification Application to expand existing office by adding suite 107 located at 27625 Jefferson Ave.

PA26-0360 41875 C St 922-080-010 Julie Nard 08/26/2026
Jerrald Alcaraz
ROMAN
PL Temporary Plan Review
Temecula, CA 92592

CATHOLIC
Use Permit

BISHOP OF SB
Case Title / Description: St. Catherine Church Gratitude Festival TUP: ATemporary Use Permit for a Gratitude Festival with food and activity booths to occur on November 14 and 15, 2026 from 7:00 AM to 9:00 PM. There will be food, alcohol, live entertainment, and fair rides at this event. The event is located at 41875 C Street.

PA26-0361 32421 Cassino Ct 959-130-061 Julie Nard 08/26/2026 Brad Daniels
Brad Daniels
PL Modifications Plan Review
Temecula, CA 92592
Case Title / Description: Room Addition MOD: A Modification Application for a proposed interior remodel, bathroom addition, and room addition of 488 square feet extending into the back yard of the property.

PA26-0362 26493 Ynez Rd Suite B 910-300-018 Marcella Mills 08/27/2026 08/28/2026 Joy Parisi

KIMCO PALM
PL Modifications Approved
Temecula, CA 92591
PLAZA
Case Title / Description: Goldfish Swim School MOD: A Modification Application for the removal of a door and replacement with windows and the addition of double entry doors at an existing commercial building located at 26493 Ynez Road, Suite B.

PA26-0363 27368 Via Industria 909-321-007 08/27/2026
Steven Hill
Steve Sommers
PL Modifications Plan Review
Temecula, CA 92590
Case Title / Description: SDH, Inc. MOD: A Modification Application to replace an existing window with a new glass door to match existing doors on subject property.

PA26-0364 27420 Ynez Rd 921-290-013 Yannin Marquez 08/31/2026 Sherrie Munroe
TVBG
PL Modifications Plan Review
Temecula, CA 92591

PROPERTIES
Case Title / Description: GMC Buick Shade Structure MOD: A Modification Application to construct a detached shade structure and install three lifts at the rear of 27420 Ynez Road.

Page 5 of 6 ends

Assigned Planner Approval
PA Number Project Address APN Apply Date Date Applicant PA26-0366 32085 Temecula Pky 960-010-043 Julie Nard 08/31/2026 Elias Gonzalez Temecula, CA 92592
Case Title / Description: Tom's Adventures Pumpkin Patch TUP: A Temporary Use Permit for Tom's Adventures Pumpkin Patch located at 32085 Temecula Parkway for a pumpkin patch from September 25 through November 1, 2026. The pumpkin patch operations will be held seven days a week, Monday through Friday from 4pm to 9pm and Saturday through Sunday from 11 am to 9pm. the activities on site will include pumpkin sales, inflatable rides, visitor walkways, and porta potties. The property will have temporary fencing, tents, booths and other necessary equipment for daily operations.

PREAPP26-0 28450 6Th St 940-310-049 Marcella Mills 08/25/2026 Christopher 358 Temecula, CA 92590 Campbell
Case Title / Description: 6th Street Apartments DP Pre-App: A Pre -Application for the development of 16 townhome units and 30 apartments on two parcels totaling 2.24 acres located at APN 940-310-049 and 940-310-052.

PREAPP26-0 26531 Ynez Rd 921-680-023 Yannin Marquez 08/26/2026 Chris Krstevski 359 Temecula, CA 92590
Case Title / Description: Abbott Vascular Ground Mounted Solar Pre-App: A Pre -Application for a Minor Modification to install a 999-kW ground mounted solar array located at 26531 Ynez Road.

PREAPP26-0 40105 Calle Medusa 957-170-053 Marcella Mills 08/31/2026 Ibrahim 365 Temecula, CA 92591 Mohamed
Case Title / Description: 40105 Calle Medusa Custom Home Pre-App: A Pre -Application for a single-family residence to be constructed at 40105 Calle Medusa.

Company Owner Plan Type Status
REDHAWK PL Temporary Plan Review
TOWNE Use Permit

CENTERII
Bradley Toole PL Plan Review
Pre -Application
PL Plan Review
Pre -Application
Robert Jones PL Plan Review
Pre -Application

Page 6 of 6 ends

Item No. 20

CITY OF TEMECULA

AGENDA REPORT
TO: City Manager/City Council
FROM: Mark Rigali, Captain
DATE: September 22, 2026
SUBJECT: Temecula Sheriff's Monthly Report (August 2026) PREPARED BY: Jeret McClellan, Sergeant
RECOMMENDATION: That the City Council receive and file monthly report.

ATTACHMENTS: Monthly Report

I

CAPTAIN MARK RIGALI
Oki :4 :111 9L
AUGUST 2026
111
M
This report is dynamic in nature, and as such, each monthly report is compiled to take advantage of the latest RMS information being entered at the station level.

As a result, crime totals will not be static from month to month.

PART 1 CRIMES
Part 1 Crime"
Homicide
July
0 August
0 Rape
3 1
Robbery
2 2
Aggravated Assault
17 20
Burglary
9 19
Vehicle Theft
12 15
Larceny Theft
88 85
Arson
2 0
INNER
■

FORMER,

RESPONSE TIME
Average Response
Priority 1

5.67 5.98
Priority 2

10.31 10.38
Priority 3

15.63 15.01
Priority 4

18.45 18.11
2223
Priority 1: Involved circumstances that pose, or did pose in the immediate past, a clearly defined threat to human life or property, and which involve a high level of violence or the potentialfor serious injury.

Priority 2: Involve circumstances of an urgent, but not life -threatening nature. They are generally disturbances with a potentialfor violence, minor assaults and batteries, etc.

Priority 3: Involve circumstances that are neither urgent nor life -threatening.

Priority 4: Except for a few felonies, most past incidents are classified as Priority4.

Priority 5 & 9 : Those calls meeting the criteria for Code 5 & Patrol calls ( NOT SHOWN).

Priority1, 65, 1%
Priority4, 1253, 23%
Priority2, 1834, 34%
Priority3, 2223, "� /o
■
■

INVESTIGATIONS
Investigations
Activity August
Beginning Caseload 153
Number of Assigned Cases 16
Number of Closed Cases
25 Number of Arrests
4 Other Cases Closed (UNF, SUS, EXC)
18 Number of Search Warrants Written
Out of Custody Filings
45 4
Cell Phone Forensic Exams
Call Outs
Exigency Orders
CPS / APS Referrals Received
Forensic Interviews ( Sex & Physical Abuse)
Patrol Assists
9 4
5 112
5 12
Court hours
4 otal # of Sex Registrants
otal # of Arson Registrants
otal # of Sex Offenders processed I Compliance checks
I # of Sexually Violent Predators
In Violation
126
17/1

Patrol & Investigators investigated a hate
crime/threat at a local place of worship, located in
the 31000 block of Nicholas Road. Through
collaboration with Sheriff Forensics Unit, CAL -ID,
and Federal law enforcement task force resources,
the suspect was identified as Louis George
White of Warner Springs. The suspect was
apprehended by the Sheriff Special Enforcement
Bureau. Investigators served a search warrant at
the suspect's residence and seized numerous
firearms and ammunition. White was booked into
jail for numerous crimes related to the threat and
illegal weapon possession. Lead Investigator: Inv.

Roberts (TE262380041)
s44#440
Patrol & Investigators investigated a theft of a local Flock camera system. Investigators were called out to the scene. The stolen components were recovered from the suspect's residence. The suspect, Andrew Anderson, was arrested and booked into custody. Lead Investigator: Inv. Mills (SW262370033)
Inv. Morris investigated a past sexual abuse case involving a suspect who sexually abused several children over their lifetime. The suspect was identified as Jose Renteria of Murrieta. Investigators executed a search warrant at the suspect's residence, and he was arrested. The suspect was booked into custody for numerous charges related to sexual abuse. Lead Investigator: Inv. Morris (SW260070009)
Corporal Au investigated a brandishing a firearm case in the 37000 block of Quarter Valley Road. The suspect, Christopher Tompkins, brandished a firearm at a local contractor. The suspect was a registered sex offender and prohibited from possessing any firearms. A search warrant was executed at the suspect's residence. Numerous firearms were seized. The suspect was arrested for brandishing and weapons charges. Lead Investigator: Corporal Au (SW261800025).

r
yNvan
z �
� Z
.....'�QS/DE C�J
Team Activity
On -view Felony Arrests
On -view Misdemeanor Arrests
Felony Arrest Warrants Served
Misdemeanor Arrest Warrants Served
Follow — up Investigations / Search Warrants / Surveillance Operations Pedestrian Checks
Traffic Stops / Vehicle Checks
Contraband.

Firearm / Weapon
Stolen Property
Vehicles Recovered
Cash (dollars)
August
12 13
0 2
73 9
81 3
1 0
932
Cocaine (grams)
Heroin ( grams)
175
0 Pills (count)
0 Marijuana (grams)
Marijuana products
Fentanyl (grams)
0 27
0 Fentanyl (pills)
0 Methamphetamine (grams)

3.5 Psilocybin (grams)
0 Proactive Operation
On 08/30/26, patrol observed numerous fully patched Vagos Outlaw Motorcycle Gang members riding through the City of Temecula. They drove to the Burgers and Beer restaurant in town. They set up EZ-up tents in the parking lot. Over 100 members and associates showed up. Patrol requested assistance. Units from the Mall, SET, and RBST responded to monitor the restaurant and surrounding streets. Deputies began conducting traffic enforcement and stopped numerous members and associates, issuing multiple citations during the operation for violations to include, but not limited to, failure to stop at a stop sign, expired registration, and modified exhaust. One of the riders, Jerry Hernandez Serrano, fled a short distance on his motorcycle, and a pursuit was initiated. He was arrested for evading.

Fiu1�GWc.w 3�
-JiS- msfA� ur1Vtl�UEi''
Fiu l A'. 13 RwNT- P"At.A
cry. ax .W3 ?a. 05
Suspect Arrested for Distribution of Marijuana to Minors.

In April 2026, a school resource deputy received information regarding a subject who was using social media platforms to sell marijuana vape pens to juveniles in the Temecula area.

SET assumed the investigation. During the investigation, deputies obtained a vehicle description for the suspect, who was later identified as David Hemosillo, a 20-year-old resident of Moreno Valley.

On August 6, 2026, deputies located the suspect's vehicle in the city of Moreno Valley. A vehicle stop was conducted in the area of Perris Boulevard and Iris Avenue, where Hemosillo was taken into custody without incident. Deputies served a search warrant at Hemosillo's residence located in the 15000 block of Perris Boulevard, Moreno Valley.

During the investigation, deputies learned of a second location connected with Hemosillo. An additional search warrant was served in the 30000 block of Milky Way, Temecula. During the service of the warrants, deputies located a stolen firearm, cocaine packaged for sale, and marijuana products.

Hemosillo was booked into CBDC for cocaine sales, selling marijuana to minors, contributing to the delinquency of a minor, and possession of a stolen firearm.

RBST
Team Activity
Beginning Caseload
August
63 Total Cases Assigned
18 Total Cases Closed
16 Search Warrants prepared / served
19 Arrests
16 Out of Custody Filings
2 CORE TEAM
Reports Written
On -Sight Felony Arrests
On -Sight Misdemeanor Arrests
Felony Arrest Warrants Served
Misdemeanor Arrest Warrants Served
traffic / Misc. Citations
Area Checks
Camp Checks
Pedestrian Checks
Traffic & Vehicle Checks
Outreach Attempts / Success
fiver the Counter Reports
502 Letters / Properties
3usiness License / 2"d Hand Dealer Applications
y+�►ERIp,�
2 ��9SIDE G�J
10 1
1 1
6 5
31 7
13 32
34/3
4 7
2 OUTREACH EFFORTS:

In collaboration with the City H.O.T and Social Workers Action Group (S.W.A.G.) 16 subjects were contacted and offered services, 3 accepted services.

PROBLEM LOCATIONS/AREAS:

Remington
Business Park
Ridge Park
Sabella
Empire Creek
Solana Way ( ABC Daycare)
Temecula Creek ( Temecula Pkwy )

CRIME PREVENTION
Prevention / Neighborhood watch meetings
Presentations / Trainings
al Events
I / Business security surveys conducted
dences / Businesses visited for past crime follow-up
n Tours
ning Review Projects 1 1 4
Outdoor Use Permits 1 1 13

Team Activity
On -Sight Felony Arrests
August
1 On -Sight Misdemeanor Arrests
6 Felony Arrest Warrants Served
Misdemeanor Arrest Warrants Served
10 4
Bar / Business Check
D.U.I. Arrests
Traffic / Parking Citations
Firearms Seized
238
14 123
0 METRO made several felony and misdemeanor arrests / cites in July:

Felony:

TE261830209 - Jason Parten was arrested for 11395(b)(1) HS and 1203.2(a) PC TE261840118 - Edward Wallace was arrested for 1203.2(a) PC, 23152(b) CVC, & 14601.2(a) PC.

TE261840120 — Khristopher Polta was arrested for 273(a)(a) and 487(a) PC and Christina Drewry was arrested for 273(a)(a) PC and 25850 PC.

TE262120120 —Jorge Carreon was arrested for his felony warrant.

Misdemeanor arrests & cites:

TE261840130 — Herbert Pender was arrested for his outstanding misdemeanor warrant.

TE261840131- Herbert Pender was arrested for his outstanding misdemeanor warrant.

TE261850004—Joe[ Briones was arrested for 23152(b) CVC.

TE261850007 — Saudy Maya Rivas was arrested for 647(f) PC.

TE261850008 —Atticus Smith was cited for open container in public.

TE261850009 —Jacob Williams was cited for public urination.

TE261850010 — Connor Jackson was cited for minor under 18 violating curfew.

TE261850011— Brandon Schafer was cited for minor under 18 violating curfew.

TE261910005 — Kyle Iltchi was cited for public urination.

TE261910172 —Jack Garrett was arrested for 23152(b) CVC and 14601.2(a) CVC.

TE261920006 — Blaze Ekelund was arrested for 647(f) PC.

TE261920094—Amy Elias was arrested 23152(b) CVC.

TE261920116 — Benjimen Sole was arrested for 23152(a) CVC and 23152(b) CVC.

TE261970153 — Michael Katchka was arrested for 23152(a) CVC, 23152(b) CVC, & 12500(a) CVC.

TE261990007 — Kadin Staggs was cited for public urination.

TE261990009 — Faith Fox was arrested for 23152(a) CVC and 23152(b) CVC.

TE262000012 - Michael Bedolla was arrested for 23152(a) CVC.

TE262050006 —Joseph Green was arrested for 23152(b) CVC.

TE262070011 — Jack Kanta and Victor Lazo- Ornelas were arrested for 647(f) PC.

TE262070014 — Allan Villanyeva was arrested for 23152(b) CVC.

TE262120002 —James Halpin was arrested for 647(f) PC.

TE262120108 — Lawrence Wehus was arrested for 23152(b) CVC.

5D�7HWFST

TRAFFIC TEAN
i
14 r
SNERlF�

PROIMENADE
Total Calls For Service
Felony / Arrest Filings
Misdemeanor Arrest / Filings
Traffic Citations
Total Customers Served
Fingerprints / Live Scans
Total Receipts
Notable Cases
391
4 5
31 752
160
$7,091.00

SR0'VS
SCHOOL
Team Activity
Felony Arrest
August
0 Misdemeanor Arrests
3 Reports
22 Citations
31 Meetings / Presentations
216
Programs/presentations conducted
by SRD's: Youth Court
Summer E- Motorcycle Enforcements:

TE261670121- 4000(a)(1) CVC: cite. No tow.

TE261670124 - 4000(a)(1) CVC: cite. No tow.

SW26168032 - unk juv on e-motorcycle near grocery outlet. Evaded. NFI.

TE261680170 -juv at Promenade Mall. Cited for no helmet and riding in business center.

TE261690077 - 2 juvs on e-motorcycle at Ronald Reagan. Driver cited 4000(a)(1) CVC, 12500(a)CVC.

Towed.

TE261690088 - passenger on above. Cited for no helmet.

TE261690138 - unk juv on e-motorcycle on calle medusa. Evaded. NFI.

SW261730026 - juv w/ e-motorcycle at Winchester x Thompson. 4000(a)(1) CVC. Towed.

SW261730028 - juv w/ e-motorcycle at Winchester x Thompson. 4000(a)(1) CVC. Towed.

SW261730030 -juvw/ e-motorcycle at Winchester Thompson. 4000(a)(1) CVC. Towed.

SW261730031 - juv w/ e-motorcycle at Winchester Thompson. 4000(a)(1) CVC. Towed.

TE261820084 - juv on e-motorcycle in Birdsall Park. 4000(a)(1) CVC. Towed.

SW261820041 - juv on e-motorcycle at Beyond Market on Auld Rd. 4000(a)(1) CVC. Towed.

SW261820046 -juv on e-motorcycle at Beyond Market on Auld Rd. 4000(a)(1) CVC. Towed.

SW261830026 - Juv on E-motorcycle seen riding at Birdsall. Cited and towed 4000(A)(1) CVC TE261880090 - Juv w/ E-motorcycle at Beyond in Harveston. Cited and towed 4000(A)(1) CVC TE261880105 - Juv on E-motorcycle at Promenade Mall. Cited and towed 4000(A)(1) CVC TE261900085 - Juvenile on e-motorcycle, 4000(A)(1) CVC. Cited and Towed.

TE261900093 - Juvenile on e-motorcycle, 4000(A)(1) CVC. Cited and Towed.

SW261940038 -juvenile riding e-motorcycle. Cited and towed. 4000(A)(1) CVC TE261970085 - Juvenile riding e-motorcycle. Cited and towed. 4000(A)(1) CVC TE261970086 - Juvenile riding e-motorcycle. Cited and towed. 4000(A)(1) CVC SW262010028: Rider on E-Motorcycle. Towed and Cited. 4000(A)(1) CVC SW262010033: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC SW262010034: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC SW262020029: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC TE262020110: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC TE262030084: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC SW262030026: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC TE262040100: Juvenile on E-motorcycle. Towed and Cited. 4000(A)(1) CVC TE262040145: Juvenile on E-motorcvcle. Towed and Cited. 4000(A)(1) CVC

r
SNERlF�
OLD
TOWN

STOREFRONT
2 LF��IDE COJ
Total Customers Served 11 542
Fingerprints / Live Scan 107
Police Reports Filed 3
VICR Releases 20
Citations signed off 22
Total receipts 11 $7,288.00

SµERIp�
2 VOLUPTc,ERS
in Hours 11 36.50
munity Action Patrol ( CAP ) hours 11 268.65
rve Officer hours ( patrol ) I 1 0.00
nteer Patrol hours 11 96.00
rer hours 11 95.95
on / Administration 11 38.50
Posse Hours 11 507.00
otal Volunteer hours 11 941.15
II Out Events I 1 0
Special Event Hours 120.00
Area Checks 34
Traffic / Misc. Citations 6

alp\�� \ � �� .�:►
z
imp
�* �t +,•
UGUST' 6
4 R RD AT THE PROMENADE
ALL
.1 NERUrA
-A
o"
r
f >5
i T
Prepared by CA M. Chiodo 09/08/26 19

L EV
Our Explorers took time to clean and polish Deputy Hintergardt's memorial sign, help clean up the park, and participate in a fun -filled physical training session. It was a great day to come together, honor a fallen member of the Riverside County Sheriff's Office, and reflect on the service and sacrifice of Deputy Kent Hintergardt.

Item No. 21

CITY OF TEMECULA

AGENDA REPORT
TO: City Manager/City Council
FROM: Mohsen Maali, Acting Director of Public Works/City Engineer DATE: September 22, 2026
SUBJECT: Public Works Department Monthly Report
RECOMMENDATION: Receive and file the Public Works Department Monthly Report for Capital Improvement Projects, Maintenance Projects, and Land Development Projects. This report may also be viewed on the City's website at:
hlt2://temeculaca.gov/270/Cqpital-improvement-Projects-CIP

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

CAPITAL IMPROVEMENT PROJECTS

CIRCULATION PROJECTS
Diaz Road Expansion, PW17-25
Description Improve Diaz Road to meet the roadway classification of Major Arterial (4 Lanes Divided), between Cherry Street and Rancho California Road. The 2.2-mile stretch will be widened, extended, and/or improved to create a contiguous Major Arterial segment. The project will be developed and constructed in two phases.

Phase 1 will include improvements on Diaz Road from Winchester Road to Rancho California Road. Phase 2 will include improvements to Diaz Road from Cherry Street to Winchester Road.

Cost: $17,050,991
Status: The environmental Initial Study has been approved, Mitigated Negative Declaration adopted, and Notice of Determination filed in May 2022. Design is 60% complete. Regulatory permit applications must be resubmitted for the U.S. Army Corps of Engineers (USACE) 404 Nationwide Permit and California Department of Fish and Wildlife Services (CDFW) Streambed Alteration 1602 due to the change in scope of the Murrietta Creek Phase 2B Project, headed by ACOE and Riverside County Flood Control and Water Conservation District (RCFC&WCD). Current activities include design coordination with utility purveyors (SCE, RCWD, and EMWD) and City project PW16-05 Murrieta Creek Bridge at Overland Drive, and RCFC&WCD of regulatory permit applications for SWRCB 401 Water Quality Certification and USACE Section 408. Staff is evaluating mitigation options for Temecula Creek to comply with regulatory permits.

Construction previously anticipated to start in Spring of 2024 is now delayed to mid-2028 due to coordination with USACE and RCFC&WCD on their Murrietta Creek Phase 2B Project, and the federal funding of $2M added to the project for the Federal 26/27 fiscal year. Federal funding requires completion of certain environmental documentation, such as under the National Environmental Policy Act (NEPA), prior to project construction, which is anticipated to take approximately 1 year to complete once funding is authorized.

French Valley Parkway/Interstate 15 Improvements - Phase II, PW16-01 Description: Design and construction of the two-lane northbound collector/distributer road system beginning north of the Winchester Road interchange on -ramps and ending just north of the Interstate 15/Interstate 215 junction with connection to Interstate 15 and Interstate 215. Project close out is in progress.

Cost: $139,751,346
Status: The project was opened for public use on April 28, 2025. For detailed information, please visit the project website at TemeculaCA.aov/FVP2.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
CIRCULATION PROJECTS (Continued)
French Valley Parkway/Interstate 15 Improvements - Phase III, PW19-03 Description: Design and construction of the full -width French Valley Parkway from Jefferson Avenue to Ynez Road, including the bridge overcrossing of Interstate 15 and the northbound on -ramps.

Cost: $77,146,000
Status: Design, environmental, and right-of-way activities started in April 2025 and are expected to be complete in late 2029.

Murrieta Creek Bridge at Overland Drive, PW16-05
Description: Design and construction of a new bridge crossing over Murrieta Creek between Rancho California Road and Winchester Road.

Cost: $31,944,641
Status: Design plans are 90% complete. The project has received MSHCP conformance. NEPA approval was achieved in October 2023. CEQA was approved in February 2024. Construction start is anticipated in Summer 2027, depending on the availability of HBP funds. Staff continue to work with Caltrans to advance HBP funds to earlier fiscal years to meet the project schedule. Also, additional coordination with ACOE and RCFC is required, as Murrietta Creek Phase 2B will likely be under construction concurrently with this project. As of May 2024, Caltrans has authorized full funding for PE and ROW Phases, so all preconstruction activities are currently authorized for HBP funds. ROW phase has started and is anticipated to be completed by winter 2027. On January 27, 2026, the City Council authorized the project to proceed with ROW negotiations with RCFC&WCD. Construction is estimated to start in 2028.

Overland Drive Widening, PW20-11
Description: This project includes widening Overland Drive from Jefferson Avenue to Commerce Center Drive to two lanes in each direction, and the completion of missing segments of sidewalk, streetlights, and the installation of the traffic signal at Commerce Center Drive and the modification of the traffic signal at Jefferson Avenue.

Cost: $6,857,804
Status: On July 3, 2024, the Initial Study/Mitigated Negative Declaration (IS/MND) started the 30-day public notice for comments. It was completed on August 2, 2024. The project is in Environmental Review and Design phase. The City consultant and staff are working on the project's right-of-way requirements and temporary construction easements. Construction is estimated to start in late 2027.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
CIRCULATION PROJECTS (Continued)
Rancho California Road Median Improvements, PW23-04
Description: Design and construction of missing raised concrete medians with landscaping between Humber Drive and Butterfield Stage Road. Additionally, there will also be construction of missing improvements on the north side of Rancho California Road, between Riesling Court and Promenade Chardonnay Hills. The improvements will include median curbs, curb and gutter, sidewalks, and landscape and irrigation.

Cost: $5,458,000
Status: Design on hold at 90% because of deficiency in construction funds.

Citywide Slurry Seal FY2026-27, PW26-03
Description: Slurry Seal the following communities: Harveston, Wolf Creek, and Vintage Hills.

Cost: $1,900,000
Status: Project was publicly advertised for construction bids between July 16, 2026, and August 26, 2026. The bids were electronically received and opened, and the results were publicly posted on the City's online bidding platform. On September 22, 2026, staff will recommend that the City Council award a construction contract to Roy Allan Slurry Seal, Inc., in the amount of $1,616,628.70 for the project.

Ynez Road Improvements — Phase I, PW23-02
Description: This project includes widening the easterly side of Ynez Road, from Rancho Vista Road north roughly 1600 feet, to two lanes in each direction, and the completion of missing segments of curb and gutter, sidewalk, and striped medians, in coordination with adjacent development.

Cost: $4,518,787
Status: The project is currently in design, environmental review, and right-of-way acquisition. The Notice of Intent to Adopt a Mitigated Negative Declaration (MND) was posted on December 10, 2025. The corresponding public review comment period also commenced on December 10, 2025, and concluded on January 9, 2026.

The MND environmental document was adopted on January 27, 2026. Construction is estimated to start in mid-2027.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
CIRCULATION PROJECTS (Continued)
De Portola Road/Jedediah Smith Road Roundabout Project, PW23-01 Description: This project includes the design and construction of a roundabout on Ynez/De Portola Road at the intersection of Jedediah Smith Road. The improvements include the construction of a raised traffic circle with a desert -style hardscape.

Cost: $4,469,000
Status: This project is currently in design, environmental, and right-of-way clearance. Design completion is anticipated in late 2026.

La Paz Road Roundabout Reconstruction, PW25-04
Description: Redesign and reconstruction of the existing roundabout on Ynez Road at the intersection of La Paz Road.

The improvements include reconstructing the raised traffic circle, entry medians, landscaping, lighting, and the overall alignment of the existing roundabout.

Cost: $3,809,000
Status: The project is currently being designed. Design completion is anticipated in late 2026.

Mercedes Street Sidewalk, PW25-09
Description: This project will construct the missing segment of sidewalk on the west side of Mercedes Street between Main Street and a point approximately 160' south of 3rd Street. The project will also construct crosswalks at 3rd Street and a potential mid -block crosswalk connecting the southern limit of the project to the parking structure.

Cost: $2,400,000
Status: Design began in December 2025. Once the design is complete, including coordination with private properties, bids for construction will be requested, and construction will follow. The total design and construction budget is estimated to exceed $2M, depending on bids. Construction is estimated to start in mid-2027.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
CIRCULATION PROJECTS (Continued)
Pauba Road Pavement Rehabilitation, PW25-05
Description: This project will rehabilitate approximately 1.4 centerline miles of roadway along Pauba Road between Margarita Road and Ynez Road, totaling approximately 440,000 square feet of pavement. The roadway rehabilitation will consist of grinding three inches of the existing pavement, followed by placement of three inches of new asphalt concrete materials. The work also includes removal of existing pavement delineation, restriping, and replacement of existing curb ramps with Americans with Disabilities Act (ADA)-compliant curb ramps. This project supports the City's core values, i.e., Transportation, Mobility and Connectivity.

Cost: $2,039,471 (Construction Contract)
Status: Contractor has finished pavement resurfacing, road striping, and loop detectors installation. The project is substantially completed.

Meadows Parkway Pavement Rehabilitation, PW25-07
Description: This project will rehabilitate approximately 4.5 centerline miles of roadway across 3 roads: Meadows Parkway between Temecula Parkway and Rancho California Road, Rancho Vista Road between Ynez Road and Margarita Road, Pauba Road between Butterfield Stage and Via Del Monte, and the intersection of Margarita Road and Winchester Road. The roadway rehabilitation will consist of grinding the existing pavement, followed by placement of new asphalt concrete materials. The work also includes removal of existing pavement delineation, restriping, and replacement of existing curb ramps with Americans with Disabilities Act (ADA)-compliant curb ramps. This project supports the City's core values, i.e., Transportation, Mobility and Connectivity.

Cost: $4,195,697
Status: Project specifications are approximately 90% complete. Staff anticipate requesting City Council authorization to advertise the project for construction bids in October 2026.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

INFRASTRUCTURE PROJECTS
Bike and Trail Program — Great Oak Trail Lighting, PW21-16 Description: The project includes the installation of solar lights along the Great Oak Trail adjacent to the northeast side of Pechanga Parkway from Deer Hollow Way to Loma Linda Road.

Cost: $1,083,724.35
Status: Project was publicly advertised for construction bids between July 16, 2026, and August 13th, 2026. The bids were electronically received and opened, and the results were publicly posted on the City's online bidding platform. On September 22, 2026, staff will recommend that the City Council award a construction contract to Earthscapes, in the amount of $260,348.00 for the project.

Fire Station 73 Gym/Garage, PW19-13
Description: The project consists of adding a second garage in the rear of the property to park the squad and Urban Search and Rescue (USR) vehicle, along with a gym and storage rooms. The construction is anticipated to be completed in the Fiscal Year 2025/26.

Cost: $5,165,680
Status: The Joint Project Review (JPR) with the Western Riverside County Regional Conservation Authority (RCA) is ongoing and progressing toward completion, though the review process is taking longer than initially anticipated. Coordination with regulatory agencies will continue once the RCA review is finalized. Project plans and specifications are near completion. Project bidding will follow the conclusion of environmental review activities. The Western Riverside County Regional Conservation Authority (RCA) has been conducting a Joint Project Review (JPR) for the project since August 6, 2025. Regulatory agencies will have 10 days to conduct their JPR once RCA is complete. The RCA response to latest JPR submittal was submitted in December 2025. The City Council approved the project plans and specifications and authorized advertising for construction bids on July 14, 2026; construction contract is anticipated to be awarded by the City Council in October 2026.

Fire Station 84 Renovation, PW19-14
Description: This project includes the design, construction, and renovation of Fire Station 84. The renovations include adding a Wellness Room, expanding the Storage Room, and upgrading the Training Room. Also, the upgrades include electrical, windows, flooring, paint, tile, HVAC, cabinets, plumbing fixtures, garage bay doors, and any other necessary improvements to comply with ADA accessibility requirements.

Cost: $3,529,450
Status: Construction started on October 27, 2025. Construction duration is anticipated to take 12 months, through November 2026.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
INFRASTRUCTURE PROJECTS (Continued)
Interstate 15/State Route 79 South Interchange Enhanced Landscaping, PW17-19 Description: Landscape beautification of the Interstate 15 corridor between French Valley Parkway and Temecula Parkway, including each interchange, in association with Visit Temecula Valley and the Pechanga Tribe.

This project includes the design and construction of enhanced landscaping, hardscape, and irrigation between the freeway and ramps on the west side of the Interstate 15 / State Route 79S (Temecula Parkway) interchange.

Cost: $3,630,295
Status: Project has entered the Landscape Maintenance phase. The contractor is responsible for maintaining plants for one year until November 2026.

Traffic Signal - Streetlight and Signal Communications Upgrade — Citywide, PW23-13 Description: This project will upgrade all traffic signals' safety lights to LED and install communication system upgrades to 42 signals Citywide. Upgraded traffic signal improvements include LED streetlights, signal wiring, vehicle heads, controller cabinets, fiber cable, ethernet switches, wireless radios, and related communication equipment to improve safety and operations with optimized traffic signal timing coordination. Signal timing coordination will be improved along Butterfield Stage Road and Ynez Road corridors.

Cost: $3,255,900
Status: Project is currently being advertised for construction bids. Contract award to follow in Fall 2026.

Traffic Signal Fiber Optic Extension, PW25-01
Description: This project will provide the design and installation of fiber optic communications, including conduit, cable, pull boxes, and related communication equipment for traffic signal operations. Various signalized intersections will be improved along the Margarita Road, Meadows Parkway, Date Street, and Nicolas Road corridors.

Cost: $1,675,000
Status: This project is currently in the design phase. Design completion anticipated early 2027.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
INFRASTRUCTURE PROJECTS (Continued)
ADA Transition Plan Implementation — CDBG Ramps, PW24-07 Description: Replace approximately 42 curb ramps with ADA-compliant curb ramps. Seven (7) ramps on Ynez Road and the remainder in the Harveston community.

Cost: $403,660
Status: The City Council awarded the construction contract on July 28, 2026. The project is under construction and is anticipated to be completed in early 2027.

Auto Mall Wayfinding Signs- CM22-01
Description: Fabrication and installation of 4 Auto Mall Wayfinding Signs along Ynez Road between Temecula Town Center Drive and Waverly Lane
Cost: $298,860
Status: Notice to proceed was issued on August 10, 2026. Construction is underway. Fabrication of signs and installation. Project completion is anticipated early December 2026.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

PARKS AND RECREATION PROJECTS
Long Canyon Creek Park Restrooms, PW23-18
Description: This project provides for the design and construction of a new restroom facility at Long Canyon Creek Park that meets current ADA accessibility compliance standards.

Cost: $1,497,930
Status: Construction started on January 26, 2026. Notice of completion was approved by the City Council on September 8, 2026. The project ribbon cutting was on July 8, 2026.

Ronald Reagan Sports Park Skate Park, PW22-07
Description: Remove and replace the existing skate park and install state-of-the-art skate plaza elements.

Cost: $6,110,000
Status: Construction started on January 6, 2026. Anticipated completion in December 2026.

Vail Ranch Park Restrooms, PW23-06
Description: This project provides for the design and construction of a new restroom facility at Vail Ranch Park that meets current ADA accessibility compliance standards.

Cost: $1,392,930
Status: Construction started on January 26, 2026. Notice of completion will be considered by the City Council September 8, 2026. The project ribbon cutting was on July 15, 2026.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

LAND DEVELOPMENT PROJECTS

TRACT DEVELOPMENTS
Altair Tract Development
Description/ Location: Construction of approximately 1,750 new residential units and the construction of the Western Bypass (Pu'eska Mountain Parkway) in the western Temecula hills above the Old Town District between Rancho California Road and Temecula Parkway/ State 79 South.

Developer: Brookfield Residential
Status: Currently, production phases for Villages A and B phase 1 on the Northern section of the development, and precise grading lots for Villages C1, C2, and C3 phase 2 on the Central section of the development. Skyward Way Bridge under construction with pile CIDH foundations completed, bridge abutments under construction currently. Bridge super structure delivery August 19, 2026.

Maintaining erosion and sediment control measures in the area previously cleared for Villages phases 3 and 4 on the Southern section of the development.

Elderberry Park Tract Development
Description/ Location: Construction of approximately 164 single-family residential homes in the Southeast region of the City, located along Butterfield Stage Road between De Portola Road and Temecula Parkway.

Developer: Taylor Morrison
Status: Currently constructing Model's and phase 1-3 lots. Expected opening of models late October -early November. Dry utility installation on site as well as offsite improvements for City Street lights on West side of Butterfield Stage Rd.

Richmond American Homes Tract Development
Description/ Location: Construction of approximately 132 single-family residential homes within three separate parcels in the Northeast region of the City, located along Butterfield Stage Road between Nicolas Road and Murrieta Hot Springs Road.

Developer: Richmond American Homes
Status: Currently, continuing production phases for homes and continuing to perform street onsite and offsite improvements.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
TRACT DEVELOPMENTS (Continued)
Oak Creek Development
Description/ Location: Construction of 113 single family homes located in the Northeasterly region of the City along the East side of Joseph Road between Nicolas Road and Rita Way.

Developer: Lennar Homes
Status: Currently rough grading on site.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

MULTI -FAMILY DEVELOPMENTS
Rendezvous Apartments
Description/ Location: Phase two of the Rendezvous apartment complex is located on the south side of Rancho California Road, west of Cosmic Drive.

Developer: Pacific West Development
Status: Finalizing both phase 1 and 2 buildings of the development.

Prado Townhomes
Description/ Location: Construction of 204 multi -family units located in the Northwesterly region of the City along the West side of Ynez Road between County Center Drive and Equity Drive.

Developer: Meritage Homes
Status: Currently, precise grading of lots and streets. Continuing home production.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

COMMERCIAL DEVELOPMENTS
Solana Senior Assisted Living
Description/ Location:

Construction of a 49,000 square foot senior assisted living facility located along the East side of Margarita Road between Via La Vida and Solana Way.

Developer:

Griffin Living
Status:

Continuing construction of buildings and interior improvements.

Apollo Storage
Description/ Location:

Construction of a 28,000 square foot storage facility located along Madison Avenue at McCabe Court.

Developer:

Avidovich Construction
Status:

Finalizing road improvements on Madison Avenue. Finalizing landscaping.

Lantern Crest
Description/ Location:

Construction of a 526,762 square foot, 494-unit independent living community located at the southeast corner of Date Street at Ynez Road.

Developer:

M Grant Corporation
Status:

Currently Inactive.

Sanborn Gas Station
Description/ Location: Construction of a 10,000 square foot storefront and gas station at the southeast corner of Sanborn Avenue at Jefferson Avenue.

Developer: Western States Construction
Status: Grading on site completed with pads released. Contractor constructing proposed improvements.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026
COMMERCIAL DEVELOPMENTS (Continued)
Amazon Phase II
Description/ Location: Renovation of existing warehouse, parking lot improvements, construction of a new sidewalk and parkway landscape improvements along Diaz Road at Via Montezuma.

Developer: Oltman's Construction
Status: Finalizing storm drain improvements and building final inspections.

U-haul Storage
Description/ Location: Renovation and expansion of existing U-haul storage and parking lot at 27941 Jefferson Avenue.

Developer: DAI General Construction
Status: Pads graded out and released. Waiting on building permits to move forward Dutch Brother's Coffee/Quick Quack
Description/ Location: Construction of a Dutch Brother's Coffee drive thru and Quick Quack Carwash facility at an exiting infill lot located at Bedford Court.

Developer: DCFM Construction
Status: Rough grading currently on hold until a Cultural Resources Management Plan (CRMP) is finalized and approved.

City of Temecula

DEPARTMENT OF PUBLIC WORKS

PROJECT STATUS REPORT
September 22, 2026

INFRASTRUCTURE BY OTHERS (DEVELOPMENT PROJECTS)
Murrieta Creek Phase 2B Creek Restoration Project
Description/Location: Drainage improvements and restorations to Murrieta Creek between Via Montezuma to approximately 600 feet South of Rancho California Road.

Developer: US Army Corps of Engineers
Status: Currently performing grading of slopes and construction of storm drain improvements. The contractor is currently exporting soils, dewatering systems, and working on ramps near Rancho California Road. The Notice of Intent (NOI) for dewatering work was issued by the San Diego Regional Water Quality Control Board. Construction is approximately 20% complete and overall completion is anticipated in Fall of 2028.

EMWD Wine Country Sewer Expansion Project
Description/Location: Construction of sewer expansion improvements for both Northern and Southern Temecula Wine County. A section of the project in City Limits: De Portola Road from Butterfield Stage Road to East City Limits.

Developer: JW Fowler
Status: Preparing the final pavement section of De Portola Road.

← All documents from this meeting