LYNN ROAD CLASS IV BIKE LANES AND

PEDESTRIAN IMPROVEMENTS

LYNN ROAD CLASS IV BIKE LANES AND

PEDESTRIAN IMPROVEMENTS

CITY COUNCIL

CITY ENGINEER

NADER HEYDARI
CLIFFORD G. FINLEY

PUBLIC WORKS DIRECTOR

ED JONESAL ADAM

CLAUDIA BILL-DE LA PENA, MAYOR

ROBERT ENGLER

CITY MANAGER
ANDREW P. POWERS
~

KEVIN MCNAMEE
BILL-DE LA PENA, MAYOR~ROBERT ENGLER
CLAUDIA BILL-DE LA PENA,~ KEVIN MCNAMEE

LYNN ROAD CLASS IV BIKE LANES AND

PEDESTRIAN IMPROVEMENTS

PUBLIC WORKS DEPARTMENT

PUBLIC UTILITIES WITHIN CITY OF THOUSAND OAKS
811
NOTICE TO CONTRACTOR:

NOTICE TO CONTRACTOR:

CONTRACTOR SHALL POSSES A VALID CLASS "A" GENERAL

ENGINEERING LICENSE

IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CALL THE

USA UNDERGROUND ALERT FOR LOCATION OF EXISTING UNDERGROUND

UTILITIES NO LESS THAN TWO DAYS NOR MORE THAN SEVEN DAYS PRIOR TO CONSTRUCTION.

THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY

DAMAGE DONE TO EXISTING UTILITIES DURING CONSTRUCTION

CITY OF THOUSAND OAKS
2100 EAST THOUSAND OAKS BOULEVARD
THOUSAND OAKS, CA 91362

RICK BRATCHER
805-449-5032

CALIFORNIA AMERICAN WATER COMPANY
2439 W. HILLCREST DRIVE
NEWBURY PARK, CA 91320

THOMAS BOYLE
805-498-1266, EXT. 2802
805-449-5033

JOHN NELSON
THOUSAND OAKS, CA 91362
2100 EAST THOUSAND OAKS BOULEVARD

CITY OF THOUSAND OAKS
WATER:

WASTEWATER:

SPECTRUM
2525 KNOLL DRIVE
VENTURA, CA 93003
805-494-7013
THOUSAND OAKS, CA 91361
3589 FOOTHILL DRIVE

SOUTHERN CALIFORNIA EDISON COMPANY

BOB MIGLIORE
GAS:

CABLE TV:

ELECTRICITY:

TELEPHONE:

PATRICIA ROBERTSON
805-732-8160

JON TRELATSKY
201 FLYNN ROAD
CAMARILLO, CA 93012
805-388-2266

SOUTHERN CALIFORNIA GAS COMPANY
9400 OAKDALE AVENUE
CHATSWORK, CA 91311
805-358-1596

FRONTIER
2022

FRONTIER
201 FLYNN ROAD
CAMARILLO, CA 93010

THOMAS PEARSON
805-445-9116

WHUEY WEN HARTMAN
ATTACHMENT #5
Lynn Rd. Concept Plans
'3:
?HY?&RXQFLO???&,?&,?/\QQ5GDQG+LOOFUHVW'U%LNH/DQH,PSURYHPHQWV$WWSGI

KEVIN MCNAMEE, MAYOR

AL ADAM

DAVID NEWMAN

BOB ENGLER

MIKEY TAYLOR

PROJECT

LOCATION
#4
Lynn Rd. Improvements - Gainsborough Rd. to Hillcrest Dr.

N
N

NNNNNNNNNNNNNNN
NNN
N
W. Gainsborough Rd.

LYNN RD.

Convert Buffered Bike Lane
to Class IV Bike Lane

NNNNNNNNNNNNNNNNNNNNNNNNNNN
NNNNN
NN
LYNN RD.

Hillcrest Dr.

Convert Buffered Bike Lane
to Class IV Bike Lane
Example of Class IV Bike Lane

SECTION A-A
7'3'
11'11'12'12'5'8'
Roadway Cross Section
Proposed

ETW ETW
45'37' 16'
Lynn Rd
13'
SB
Lane 2
SB
Lane 1
NB
Lane 1
NB
Lane 2
SB
Lane 3
Class IV
Bike Lane
Class IV
Bike Lane
11'11'12'13'
ETW
Roadway Cross Section
Existing
ETW
45'37' 16'
Lynn Rd
13'
Right
of Way
12'
SB
Lane 2
SB
Lane 1
NB
Lane 1
NB
Lane 2
NB
Lane 3
SB
Lane 3
Equestrian
Trail
Install Pedestrian
Signal and Crosswalk
Install Marked Crosswalk with
Sharks' Teeth Yield Line and
RRFB
Install High Visibility
Bike Striping
Remove Northbound
Lane #3, Install Class IV
Bike Lane per Section
A-A
LYNN RD.

Hillcrest Dr.

Flexible Bike Posts
20' O.C.

Existing Equestrian
Trail - Convert to
Class IV Bike Lane
A
A
Photo of Class IV bike lane
Lynn Rd. Improvements - Hillcrest Dr. to US101 NB Ramp
Reduce Right Turn
Radius with Striping
and Channelizers
Install High Visibility
Bike Striping
Install Bike
Push Button
Install Class IV Bike
Lane per Sections B-B
Replace Fencing with
LED Light Fixture
LYNN RD. Replace existing barrier
and install new barrier
with fencing with LED
light Fixtures
Flexible
Bike Posts
20' O.C.

B
B
A
A

SECTION B-B
Roadway Cross Section
Existing
20'14'11'13'
13'13'
Lynn Rd @ SR101 ETWETW
SB
Lane 2
SB
Lane 1
NB
Lane 1
NB
Lane 2
NB
Turn Lane
NB
Lane 3Ped
walkway
8' 4'
Bridge
Barrier &
Fencing
Bridge
Barrier &
Railing
34'50' 5'

ETW ETW
Class IV
Bike Lane
7'3'
12'12'12'12'
13'5'8'
Roadway Cross Section
Proposed
34'50' 5'
Lynn Rd @ SR101
SB
Lane 2
SB
Lane 1
NB
Lane 1
NB
Lane 2
NB
Turn Lane
Class IV
Bike Lane
8' 4'
Bridge
Barrier &
Fencing
Bridge
Barrier &
Fencing
Convert Northbound
Travel Lane #3, to
Class IV Bike Lane
per Section B-B
Existing Equestrian
Trail - Convert to
Class IV Bike Lane
Lynn Rd. Improvements - Lynn Rd./US101 Overpass

SECTION C-C
7' 5' 11' 11'
34' 16'
12' 12' 3' 7'
34'
84'
Roadway Cross Section
Proposed
Bike
Lane
ETW
SB
Lane 2
SB
Lane 1
NB
Lane 2
Lynn Rd.

Bike
Lane
NB
Lane 1
ETW
Ped
walkway
8' 4'
34' 16'
12' 16' 6'
34'
84'
6' 12'16'
Bike
Lane
ETW
Roadway Cross Section
Existing
SB
Lane 2
SB
Lane 1
NB
Lane 2
Lynn Rd.

Center
Median
ETW
8' 4'
Ped
walkway
NB
Lane 1
Bike
Lane
Install High Visibility
Bike Striping
Install Class IV Bike
Lane per Sections
Below
LYNN RD.

Reconstruct
Curb Ramps
Restripe Roadway
per Section C-C Flexible Bike Posts
20' O.C.

C
C
SB 101 Off Ramp
SB 101 On Ramp
SB 101 On Ramp
Convert Northbound
Travel Lane #3, to
Class IV Bike Lane
per Section B-B
Do not show less
than 11' wide lane in
Caltrans R/W
Lynn Rd. Improvements - US101 SB Ramps

SECTION D-D
7' 5' 11' 11'
34' 16'
12' 12' 3' 7'
34'
84'
Roadway Cross Section
Proposed
Bike
Lane
ETW
SB
Lane 2
SB
Lane 1
NB
Lane 2
Lynn Rd.

Bike
Lane
NB
Lane 1
ETW
Ped
walkway
8' 4'
34' 16'
12' 16' 6'
34'
84'
6' 12'16'
Bike
Lane
ETW
Roadway Cross Section
Existing
SB
Lane 2
SB
Lane 1
NB
Lane 2
Lynn Rd.

Center
Median
ETW
8' 4'
Ped
walkway
NB
Lane 1
Bike
Lane
Install High Visibility
Bike Striping
Install Marked Crosswalk with
Sharks' Teeth Yield Line and
RRFB
Restripe to Class IV Bike
Lane per Section D-D
Install Class IV Bike
Lane per
Cross-Section D-D
LYNN RD.

SB 101 Off Ramp
SB 101 On Ramp
D
D
Lynn Rd. Improvements - US101 SB Ramps
® ®"
CITY OF THOUSAND OAKS DWG. _________ SHEET __ OF __

CITY OF THOUSAND OAKSCITY OF THOUSAND OAKS

DATEREGISTERED ENGINEER
DATE

CHECKED
DATE
DATE

DESIGNED

DRAFTED BY

PREPARED BY
C.T.O.DATER.C.E. DATEREV. SYMBOL DESCRIPTION OF CHANGE
21-21A

NADER HEYDARI, CITY ENGINEER

DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER
REVIEWED BY:
2022 PAVEMENT REHAB AND RESURFACING (CI 5538)

LYNN RD STRIPING PLAN
10 24

INSTALL RECTANGULAR RAPID

FLASHING BEACON (RRFB)

REDUCE NB RIGHT

TURN RADIUS WITH

STRIPING AND

FLEXIBLE BIKE
POSTS

LYNN ROAD CLASS IV BIKE LANES AND

PEDESTRIAN IMPROVEMENTS
Remove and Replace Curb Ramps
SEE NEXT 2 SHEETS FOR CALTRANS

BRIDGE SECTION

INSTALL MARKED CROSSWALK

WITH RRFB AND SHARK TEETH

YIELD LINE
only adding delininators from
greenmeadow to here

INSTALL TYPE VI(R/L) WHITE ARROW CENTERED IN LANE PER
CALTRANS STANDARD PLAN A24A.

D
CW
CH
VI
INSTALL CLASS IV BIKE LANE DELINEATORS SPACED AT 20' O.C.

INSTALL 6" WHITE CHEVRON PAVEMENT MARKING, ANGLED 45 DEGREES FROM DIRECTION OF TRAVEL, SPACED 35' O.C.

INSTALL DIAGONAL HIGH VISIBILITY PAVEMENT MARKING PER CALTRANS STANDARD PLAN A24F.

INSTALL CLASS IV BIKE LANE PAVEMENT MARKINGS WITH DELINEATORS SPACED 20' O.C.

INSTALL WHITE BIKE LANE SYMBOL WITH PERSON WITH ARROW PER CALTRANS STANDARDS PLANS A24A.

Install Rectangular Rapid
Flashing Beacon (RRFB)
Install Marked Crosswalk with RRFB
and Shark Teeth Yield Line

INSTALL RECTANGULAR RAPID

FLASHING BEACON (RRFB)

REDUCE NB RIGHT

TURN RADIUS WITH

STRIPING AND

FLEXIBLE BIKE
POSTS

INSTALL MARKED CROSSWALK

WITH RRFB AND SHARK TEETH

YIELD LINE
Install Rectangular Rapid
Flashing Beacon (RRFB)
Install Marked Crosswalk with RRFB
and Shark Teeth Yield Line
S. WENDY DR
Convert Buffered Bike Lane
to Class IV Bike Lane
Convert Buffered Bike Lane
to Class IV Bike Lane
Convert Buffered Bike Lane
to Class IV Bike Lane
Flexible Post for Class IV bikeExample of Class IV Bike Lane S. REINO RD.

Lynn Rd. Bike Lane Improvements - US101 SB Ramp to S. Reino Rd.