1 9/9/2025
HUD*
CAPER**
FY 2024-25
City Council
September 9, 2025
*US Dept of Housing & Urban Development
**Consolidated Annual Performance and Evaluation Report Annual 2024-25 Consolidated Annual
Performance and Evaluation Report (CAPER)
is required by U.S. Department of Housing and
Urban Development (HUD)
Purpose is to report expenditures on
Community Development Block Grant (CDBG)
Background
1 2
Item 10.A.
2 9/9/2025
3CDBG Budget
CDBG Resources$ 47,504.37 Prior Year Funds$ 607,042.00 2024-25 CDBG Grant$ 654,546.37 Total Budget 4CDBG ActivitiesCDBG Funds were Expended in Categories:1) Community Projects: $371,013.302) Public Services: $91,0003) Administration: $108,465.85CDBG Ending Balance as of June 30, 2025: $84,067.22 3 4
3 9/9/2025
Many Mansions Bella Vista Apts. (72 units) Expended: $119,058.17Grant Balance: $52,941.83Install Security Cameras, Repair/Replace gazebo, and install lightsCDBG Community Projects: Housing Rehabilitation5Multi-FamilyHabitat for Humanity of Ventura County (10 units)Expended: $117,955.13Grant Balance: $16,044.87Senior Alliance for Empowerment (SAFE) (10 units)Expended: $134,000 Grant Balance: $0Single-Family Many Mansions Community Services (578 clients) $25,000Conejo Valley Senior Concerns Meals on Wheels (88 clients) $20,500 St Vincent de Paul Emergency Assistance (41 clients) $20,500 CDBG Public / Social Services6Non-Homeless ServicesTurning Point FoundationOur Place Safe Haven (12 clients) $25,000 Homeless Services 5 6
4 9/9/2025
7 City’s Operations CostsPublic Noticing, CDBG Program MonitoringExpended: $68,494.85Ventura County ContractsFair Housing expended $17,7212025-2029 Regional Consolidated Plan and other Documents expended $22,250CDBG Administration CDBG Summary as of June 30,20258$ 654,546.37Balance on July 1,2024$ 570,479.15Expenditures$ 84,067.22Balance on June 30, 2025Open Project2024 Grant: $52,941.83Allocation to2025 Action Plan2023 Grant: $15,080.52Future Allocation2024 Grant: $16,044.877 8 5
9/9/2025
Recommendations
1. Approve Program Year (PY) 2024-25 Consolidated Annual Performance & Evaluation Report (CAPER) for submittal to U.S. Department of Housing and Urban Development (HUD)
2. Find that the PY 2024-25 CAPER action is not a project as defined under the California Environmental Quality Act
(CEQA)
Thank you!
9 10
1 9/9/2025
Water and Wastewater
Financial Plans & Rates
September 9, 2025
Tara Tosatto, Budget Officer
1. Water Recommendations
2. Wastewater Recommendations
3. Utility Assistance Program
4. Proposition 218 process and timeline
Overview
1 2
2 9/9/2025
WATER
• Serves 17,000 potable water
customers (appx. 50,000 residents)
• 100% imported
WASTEWATER
• Serves 38,000 wastewater
customers (appx. 110,000 residents)
Utilities at a Glance
3 • Inflation (higher costs to purchase
water, energy, chemicals, supplies)
• Capital Improvement Projects (CIP)
to upgrade and maintain systems
• Ongoing Infrastructure maintenance
to keep system functioning + reliable
• State law requires fair cost of
service rates
Why Rate Adjustments
are necessary
4 3
4 3
9/9/2025
Water
• Reduce the Capital Reserve Target
• Adjust overall water rate revenue needs by 5% average • Maintaining a pass-through of wholesale water costs
• Adopting new Drought Rates
Key Water Recommendations
6 5
6 4
9/9/2025
FY 2026 TargetRecommended PolicyReserve
$8.9 million25% of annual O&M expensesOperating
$10.4 millionOne year of average annual CIPCapital
$6.0 millionReplacement cost of most critical assetEmergency $25.3 millionTotal Water Fund:
Water Enterprise Reserve Targets
7 CIP Projected Expenditures
8 7
8 5
9/9/2025
Proposed Monthly Water Rates
9 Proposed Fixed Meter Charges
Proposed
January
2027
Proposed
January
2026
CurrentMeter Type
$31.34 $29.84 $28.41 3/4-inch meter
and smaller
$49.09 $46.75 $44.52 1-inch meter
$93.50 $89.04 $84.80 1.5-inch meter
$146.79 $139.80 $133.14 2-inch meter
$315.54 $300.51 $286.20 3-inch meter
$564.22 $537.35 $511.76 4-inch meter
$1,159.28 $1,104.07 $1,051.49 6-inch meter
Proposed Single-Family Residential
Commodity Rates
20272026Current
$8.10 $7.16 $6.41 Tier 1: 0-12 HCF
$8.76 $7.79 $7.01 Tier 2: 13-30 HCF
$9.14 $8.15 $7.36 Tier 3: >30 HCF
Proposed Uniform Commodity Rates
20272026Current
$8.50 $7.54 $6.78
Multi-Family Residential
Non-Residential
& Groundwater
$9.14 $8.15 $7.36 Construction
20272026
$0.60 per HCF$0.42 per HCFIncremental Pass-Through
$1.02 per HCF$0.42 per HCFCumulative Pass-Through
Proposed Pass-Through Increases in Rates
10 9
10 6
9/9/2025
Pumping Lift Charge
11 Proposed
2027
Proposed
2026
Current
Rate
% of
Customers
$0$0$033%Zone P1 (0 Lifts)
$0.51$0.48$0.4529%Zone P2 (1 Lifts)
$0.51$0.48$0.4520%Zone P3 (1 Lifts)
$1.02$0.96$0.90~17%Zone P4 (2 Lifts)
$1.53$1.44$1.35<1%Zone P5 (3 Lifts)
• The estimates below are based on a standard ¾" meter, no pumping lift and includes wholesale pass-through.
Total Estimated Monthly Water Charges in 2026
12 11
12 7
9/9/2025
• The estimates below are based on a standard ¾" meter, no pumping lift and includes wholesale pass-through.
Monthly Water Service Charge Comparison
13 • Customer conservation during
drought = lower water sales/revenue
• Fixed system costs remain same
(staffing, pipeline maintenance, etc)
• Revenue loss without a safeguard
threatens financial stability
• Drought rates help protect the
city utility during these periods
Drought Rates
14 13
14 8
9/9/2025
• Temporary surcharge on use charges only
• Helps cover fixed costs when sales decline
• Adoption now = ability to use in the future
• Implemented only if City Council chooses
• Requires a formally declared drought stage
• Customers get > 30 days’ advance notice
Proposed Drought Rates
15 20272026Water Shortage Stage
N/AN/AStage 1 (0-10% Shortage)
$0.54$0.47Stage 2 (11-20% Shortage)
$1.07$0.94Stage 3 (21-30% Shortage)
$1.76$1.55Stage 4 (31-40% Shortage)
$2.68$2.35Stage 5 (41-50% Shortage)
$6.01$5.28Stage 6 (>50% Shortage)
Wastewater
15 16
9 9/9/2025
• Capital reserve target reduced from two years → one year of average annual CIP • Financial plan with 7% average annual revenue adjustments (FY 2026 & 2027) • Updated cost-of-service study results, revising customer factors Key Wastewater Recommendations
17 FY 2026 TargetRecommended PolicyReserve
$6.2 million25% of annual O&M expensesOperating
$12.2 millionOne year of average annual CIPCapital
$3.5 millionReplacement cost of most critical assetEmergency $21.9 millionTotal Water Fund:
Wastewater Enterprise Reserve Targets
18 17
18 10
9/9/2025
CIP Projected Expenditures
19 Customer Impacts
20 %
Difference
Service Unit
Charge
2027
Service Unit
Charge
2026
Service Unit
Charge
Current
Proposed
Flow/Strength
Factor
ERC
DefinitionCustomer Class
9.5%$45.89$42.88 $39.17 100%1 dwelling unitSingle-Family Residential 12.4%$36.71$34.30 $39.17 80%1 dwelling unitMulti-Family Residential 9.5%$45.89$42.88 $39.17 100%20 fixture unitsGeneral Commercial (Offices/Retail/All Other)
2.4%$78.01$72.90 $71.29 170%20 fixture unitsMarkets/Mortuaries 3.3%$78.47$73.32 $70.89 171%20 fixture unitsRestaurants/Bakeries 8.0%$45.89$42.88 $46.61 100%20 fixture unitsRestaurants (w/Grease Trap) 30.9%$29.37$27.44 $20.95 64%20 fixture unitsSchools
22.7%$45.89$42.88$39.1762%180 150
gallons per dayIndustrial/High Flow
23.6%$45.89$42.88$39.1767%180 150
gallons per dayCar Washes
30.9%$0.78$0.72$0.55N/Aper Service UnitOutside City Surcharge 19 20
11 9/9/2025
Monthly Wastewater Rate Comparison
21 Water
• 5% average per year revenue
adjustment for the next two years
• Wholesale water cost pass-through
continues
• New Drought Rates included
(Council-controlled, only if declared)
• Capital reserve reduced from 2
years → 1 year of CIP
Summary
22 Wastewater
• 7% average per year revenue
adjustment for the next two years
• Updated cost-of-service study (every 6
years)
• Customer class shifts: multi-family ↓,
schools ↑, restaurants w/ grease trap ↓
• Capital reserve reduced from 2 years
→ 1 year of CIP
21 22
12 9/9/2025
• Water estimated discount based on
low water use (10 HCF) is ~10%
• Wastewater discount is 11.7%
• Eligibility:
• Must be enrolled in CARE via SCE or
SCG.
• Must be a residential customer, using
the property as your primary home.
• Accounts and CARE must match.
• Limit on number of enrollees.
Utility Assistance Program
23 WastewaterWater
$60/year
$5/month
$120/year
$10/month
Schedule
24 SEPTEMBER 13, 2025
NOVEMBER 4, 2025
JANUARY 1, 2026
JULY 1, 2026
Proposition 218 Notices Mailed
Public Hearing
Water Rates Effective
Wastewater Rates Effective
JANUARY 1, 2027
JULY 1, 2027
Water Rates Effective
Wastewater Rates Effective
23 24
13 9/9/2025
1. Approve Water Financial Plan
2. Approve Wastewater Rate Study
3. Set November 4
th as public hearing for rate adoption
Recommendations
Thank you!
25 26