Updated Air Quality/Greenhouse Gas Emissions/Energy Data $77$&+0(17
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 1 / 112
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report
Table of Contents1. Basic Project Information
1.1. Basic Project Information1.2. Land Use Types1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated2.2.2. Onsite Construction Emissions by Year, Unmitigated2.2.3. Offsite Construction Emissions by Year, Unmitigated2.2.4. Total Construction Emissions by Year, Mitigated2.2.5. Onsite Construction Emissions by Year, Mitigated2.2.6. Offsite Construction Emissions by Year, Mitigated
2.3. Operations Emissions Compared Against Thresholds
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 2 / 112
2.4. Operations Emissions by Sector, Unmitigated2.5. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Grading (2028)
3.1.1. Onsite - Unmitigated3.1.2. Offsite - Unmitigated3.1.3. Onsite - Mitigated3.1.4. Offsite - Mitigated
3.2. Grading (2029)
3.2.1. Onsite - Unmitigated3.2.2. Offsite - Unmitigated3.2.3. Onsite - Mitigated3.2.4. Offsite - Mitigated
3.3. Building Construction (2029)
3.3.1. Onsite - Unmitigated3.3.2. Offsite - Unmitigated3.3.3. Onsite - Mitigated3.3.4. Offsite - Mitigated Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 3 / 112
3.4. Building Construction (2030)
3.4.1. Onsite - Unmitigated3.4.2. Offsite - Unmitigated3.4.3. Onsite - Mitigated3.4.4. Offsite - Mitigated
3.5. Building Construction (2031)
3.5.1. Onsite - Unmitigated3.5.2. Offsite - Unmitigated3.5.3. Onsite - Mitigated3.5.4. Offsite - Mitigated
3.6. Paving (2031)
3.6.1. Onsite - Unmitigated3.6.2. Offsite - Unmitigated3.6.3. Onsite - Mitigated3.6.4. Offsite - Mitigated
3.7. Architectural Coating (2031)
3.7.1. Onsite - Unmitigated3.7.2. Offsite - Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 4 / 112
3.7.3. Onsite - Mitigated3.7.4. Offsite - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated4.2.2. Electricity Emissions By Land Use - Mitigated4.2.3. Natural Gas Emissions By Land Use - Unmitigated4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated4.4.2. Mitigated
4.5. Waste Emissions by Land Use
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 5 / 112
4.5.1. Unmitigated4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 6 / 112
4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule5.2. Off-Road Equipment
5.2.1. Unmitigated5.2.2. Mitigated
5.3. Construction Vehicles
5.3.1. Unmitigated5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 7 / 112
5.8. Construction Electricity Consumption and Emissions Factors5.9. Operational Mobile Sources
5.9.1. Unmitigated5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths5.10.2. Architectural Coatings5.10.3. Landscape Equipment5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated5.13.2. Mitigated
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 8 / 112
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers
5.17. User Defined5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.2. Sequestration
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 9 / 112
5.18.2.1. Unmitigated5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary6.2. Initial Climate Risk Scores6.3. Adjusted Climate Risk Scores6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores7.2. Healthy Places Index Scores7.3. Overall Health & Equity Scores7.4. Health & Equity Measures7.5. Evaluation Scorecard7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications8.4. Construction
8.4.1. Construction Phases
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 10 / 112
8.4.2. Off-Road Equipment8.4.6. Trips and VMT
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 11 / 112
1. Basic Project Information1.1. Basic Project Information Data Field ValueProject Name Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5Construction Start Date 10/1/2028Operational Year 2031Lead Agency —
Land Use Scale Project/siteAnalysis Level for Defaults CountyWindspeed (m/s) 2.70000Precipitation (days) 22.6000Location 1868 E Thousand Oaks Blvd, Thousand Oaks, CA 91362, USACounty VenturaCity Thousand OaksAir District Ventura County APCDAir Basin South Central CoastTAZ 3505EDFZ 8Electric Utility Southern California EdisonGas Utility Southern California GasApp Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special LandscapeArea (sq ft)
Population Description
Hotel 142.000 Room 4.73333 206,184 1,000.000 — — —
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 12 / 112
Apartments HighRise
240.000 Dwelling Unit 3.87097 230,400 1,000.000 — 722.000 — Supermarket 14.1240 1000sqft 0.32424 14,124.0 1,000.000 — — —Enclosed ParkingStructure
77.0000 Space 0.69300 30,800.0 1,000.000 — — —
Parking Lot 200.000 Space 1.80000 0.00000 1,000.000 — — —Fast FoodRestaurant w/oDrive Thru
9.52400 1000sqft 0.21864 9,524.00 1,000.000 — — —
High Turnover (SitDown Restaurant)
4.35000 1000sqft 0.09986 4,350.00 1,000.000 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector
# Measure Title
Construction C-10-A Water Exposed SurfacesConstruction C-10-B Water Active Demolition SitesConstruction C-10-C Water Unpaved Construction RoadsConstruction C-11 Limit Vehicle Speeds on Unpaved RoadsConstruction C-12 Sweep Paved RoadsConstruction C-13 Use Low-VOC Paints for ConstructionTransportation T-1 Increase Residential DensityTransportation T-3 Provide Transit-Oriented DevelopmentTransportation T-4 Integrate A ordable and Below Market Rate HousingTransportation T-8 Provide Ridesharing ProgramTransportation T-10 Provide End-of-Trip Bicycle FacilitiesTransportation T-14* Provide Electric Vehicle Charging InfrastructureEnergy E-2 Require Energy Efficient AppliancesWaste S-1/S-2 Implement Waste Reduction PlanArea Sources LL-1 Replace Gas Powered Landscape Equipment with Zero-Emission Landscape Equipment
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 13 / 112
Area Sources AS-2 Use Low-VOC Paints
* Qualitative or supporting measure. Emission reductions not included in the mitigated emissions results.2. Emissions Summary2.1. Construction Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Unmit. 14.0738 13.7787 8.90363 42.2390 0.05461 0.18570 5.22103 5.40673 0.17711 1.24856 1.42567 — 10,124.5 10,124.5 0.23545 0.44374 13.9928 10,242.1Mit. 4.65980 4.36469 8.90363 42.2390 0.05461 0.18570 5.22103 5.40673 0.17711 1.24856 1.42567 — 10,124.5 10,124.5 0.23545 0.44374 13.9928 10,242.1%Reduced 67% 68% — — — — — — — — — — — — — — — —
Daily,Winter(Max)
——————————————————
Unmit. 13.5737 13.3187 8.02945 37.3987 0.07644 0.18629 10.0705 10.2568 0.18315 3.88061 4.06376 — 8,946.62 8,946.62 0.31968 0.45608 0.36252 9,074.81Mit. 4.15973 3.90475 8.02945 37.3987 0.07644 0.18629 10.0705 10.2568 0.18315 3.88061 4.06376 — 8,946.62 8,946.62 0.31968 0.45608 0.36252 9,074.81%Reduced 69% 71% — — — — — — — — — — — — — — — —
AverageDaily(Max)
——————————————————
Unmit. 8.12952 7.97866 4.55963 20.5809 0.03008 0.07984 3.37194 3.45178 0.07704 0.89815 0.97519 — 5,589.64 5,589.64 0.13153 0.31351 4.05897 5,690.42Mit. 2.50691 2.35605 4.55963 20.5809 0.03008 0.07984 3.37194 3.45178 0.07704 0.89815 0.97519 — 5,589.64 5,589.64 0.13153 0.31351 4.05897 5,690.42%Reduced 69% 70% — — — — — — — — — — — — — — — —
Annual(Max)
——————————————————
Unmit. 1.48364 1.45610 0.83213 3.75601 0.00549 0.01457 0.61538 0.62995 0.01406 0.16391 0.17797 — 925.429 925.429 0.02178 0.05191 0.67201 942.114 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 14 / 112
Mit. 0.45751 0.42998 0.83213 3.75601 0.00549 0.01457 0.61538 0.62995 0.01406 0.16391 0.17797 — 925.429 925.429 0.02178 0.05191 0.67201 942.114 %Reduced
69% 70% — — — — — — — — — — — — — — — —
2.2. Construction Emissions by Year2.2.1. Total Construction Emissions by Year, UnmitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 1.64211 1.52835 6.03755 29.3139 0.03893 0.10517 4.28599 4.39116 0.10116 1.02939 1.13054 — 7,857.09 7,857.09 0.16552 0.44374 13.9928 8,007.462030 1.57232 1.36317 5.90822 28.4838 0.03893 0.10201 4.28599 4.38801 0.09826 1.02939 1.12764 — 7,738.01 7,738.01 0.16552 0.42820 12.4217 7,882.172031 14.0738 13.7787 8.90363 42.2390 0.05461 0.18570 5.22103 5.40673 0.17711 1.24856 1.42567 — 10,124.5 10,124.5 0.23545 0.33098 13.0301 10,242.1Daily -Winter(Max) ——————————————————
2028 1.00258 0.90214 8.02945 37.3987 0.07644 0.18629 10.0705 10.2568 0.18315 3.88061 4.06376 — 8,946.62 8,946.62 0.31968 0.40296 0.12343 9,074.812029 1.63283 1.39907 7.88917 37.3288 0.07642 0.18300 10.0705 10.2535 0.18013 3.88061 4.06074 — 8,883.22 8,883.22 0.31760 0.44997 0.36252 9,006.732030 1.56456 1.34766 6.12551 27.2010 0.03893 0.10201 4.28599 4.38801 0.09826 1.02939 1.12764 — 7,587.28 7,587.28 0.17176 0.42820 0.32272 7,719.502031 13.5737 13.3187 6.85372 29.7157 0.04066 0.10883 5.02497 5.13380 0.10452 1.20260 1.30713 — 8,255.62 8,255.62 0.17967 0.45608 0.32722 8,396.35AverageDaily ——————————————————
2028 0.18106 0.16306 1.44294 6.73148 0.01376 0.03354 1.81123 1.84477 0.03297 0.69820 0.73117 — 1,610.89 1,610.89 0.05748 0.07247 0.37007 1,634.292029 1.12062 0.96029 4.55963 20.5809 0.03008 0.07984 3.37194 3.45178 0.07704 0.89815 0.97519 — 5,589.64 5,589.64 0.13153 0.31351 4.05897 5,690.422030 1.11082 0.95480 4.36559 19.4851 0.02781 0.07287 3.01796 3.09083 0.07018 0.72441 0.79459 — 5,436.12 5,436.12 0.11823 0.30586 3.83012 5,534.062031 8.12952 7.97866 4.26676 18.7883 0.02523 0.07748 2.73934 2.81682 0.07409 0.65471 0.72879 — 4,885.59 4,885.59 0.11238 0.25014 2.99974 4,965.94Annual — — — — — — — — — — — — — — — — — —2028 0.03304 0.02976 0.26334 1.22849 0.00251 0.00612 0.33055 0.33667 0.00602 0.12742 0.13344 — 266.701 266.701 0.00952 0.01200 0.06127 270.576 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 15 / 112
2029 0.20451 0.17525 0.83213 3.75601 0.00549 0.01457 0.61538 0.62995 0.01406 0.16391 0.17797 — 925.429 925.429 0.02178 0.05191 0.67201 942.114 2030 0.20272 0.17425 0.79672 3.55603 0.00507 0.01330 0.55078 0.56408 0.01281 0.13220 0.14501 — 900.013 900.013 0.01957 0.05064 0.63412 916.2262031 1.48364 1.45610 0.77868 3.42886 0.00460 0.01414 0.49993 0.51407 0.01352 0.11948 0.13300 — 808.864 808.864 0.01861 0.04141 0.49664 822.167
2.2.2. Onsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 0.00000 0.08963 0.08562 0.00000 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062030 0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 0.00000 0.08648 0.08272 0.00000 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062031 12.7849 12.6761 6.03211 26.5930 0.03907 0.17016 0.00000 0.17016 0.16157 0.00000 0.16157 — 4,040.98 4,040.98 0.16392 0.03278 0.00000 4,054.85Daily -Winter(Max) ——————————————————
2028 0.80605 0.77248 4.70961 35.4065 0.06093 0.15838 9.23636 9.39475 0.15525 3.65872 3.81397 — 6,598.26 6,598.26 0.26765 0.05353 0.00000 6,620.902029 0.80101 0.76825 4.69690 35.4078 0.06092 0.15510 9.23636 9.39146 0.15222 3.65872 3.81094 — 6,596.13 6,596.13 0.26757 0.05351 0.00000 6,618.772030 0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 0.00000 0.08648 0.08272 0.00000 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062031 12.3395 12.2715 3.76487 16.0234 0.02512 0.09329 0.00000 0.09329 0.08899 0.00000 0.08899 — 2,530.35 2,530.35 0.10264 0.02053 0.00000 2,539.03AverageDaily ——————————————————
2028 0.14512 0.13908 0.84791 6.37455 0.01097 0.02852 1.66291 1.69142 0.02795 0.65871 0.68666 — 1,187.95 1,187.95 0.04819 0.00964 0.00000 1,192.022029 0.36702 0.33217 2.25722 11.9087 0.01899 0.06799 0.56033 0.62832 0.06520 0.22196 0.28715 — 1,966.78 1,966.78 0.07978 0.01596 0.00000 1,973.522030 0.34257 0.30759 2.14378 10.6611 0.01671 0.06177 0.00000 0.06177 0.05909 0.00000 0.05909 — 1,712.02 1,712.02 0.06945 0.01389 0.00000 1,717.902031 7.44863 7.40108 2.61316 11.2072 0.01693 0.06918 0.00000 0.06918 0.06579 0.00000 0.06579 — 1,728.59 1,728.59 0.07012 0.01402 0.00000 1,734.52Annual — — — — — — — — — — — — — — — — — —2028 0.02648 0.02538 0.15474 1.16336 0.00200 0.00520 0.30348 0.30868 0.00510 0.12022 0.12532 — 196.678 196.678 0.00798 0.00160 0.00000 197.3532029 0.06698 0.06062 0.41194 2.17333 0.00347 0.01241 0.10226 0.11467 0.01190 0.04051 0.05241 — 325.622 325.622 0.01321 0.00264 0.00000 326.7402030 0.06252 0.05614 0.39124 1.94565 0.00305 0.01127 0.00000 0.01127 0.01078 0.00000 0.01078 — 283.445 283.445 0.01150 0.00230 0.00000 284.418 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 16 / 112
2031 1.35937 1.35070 0.47690 2.04532 0.00309 0.01263 0.00000 0.01263 0.01201 0.00000 0.01201 — 286.188 286.188 0.01161 0.00232 0.00000 287.170
2.2.3. Offsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 1.15493 1.09146 3.02008 14.3807 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,460.26 5,460.26 0.06830 0.42429 13.9928 5,602.402030 1.09272 0.93254 2.90692 13.5582 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,341.17 5,341.17 0.06830 0.40876 12.4217 5,477.112031 1.28890 1.10261 2.87151 15.6460 0.01554 0.01554 5.22103 5.23657 0.01554 1.24856 1.26410 — 6,083.54 6,083.54 0.07153 0.29819 13.0301 6,187.22Daily -Winter(Max) ——————————————————
2028 0.19653 0.12966 3.31983 1.99227 0.01550 0.02790 0.83413 0.86204 0.02790 0.22189 0.24980 — 2,348.35 2,348.35 0.05203 0.34943 0.12343 2,453.912029 1.14565 0.96218 3.37290 13.0247 0.01554 0.02790 4.28599 4.30153 0.02790 1.02939 1.04492 — 5,306.67 5,306.67 0.07453 0.43052 0.36252 5,437.192030 1.08497 0.91703 3.12421 12.2754 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,190.45 5,190.45 0.07453 0.40876 0.32272 5,314.442031 1.23426 1.04728 3.08885 13.6924 0.01554 0.01554 5.02497 5.04051 0.01554 1.20260 1.21814 — 5,725.27 5,725.27 0.07702 0.43555 0.32722 5,857.32AverageDaily ——————————————————
2028 0.03594 0.02398 0.59503 0.35693 0.00279 0.00502 0.14832 0.15335 0.00502 0.03949 0.04451 — 422.946 422.946 0.00929 0.06283 0.37007 442.2722029 0.75359 0.62812 2.30241 8.67222 0.01109 0.01185 2.81162 2.82346 0.01185 0.67619 0.68804 — 3,622.87 3,622.87 0.05175 0.29756 4.05897 3,716.892030 0.76825 0.64721 2.22181 8.82400 0.01110 0.01110 3.01796 3.02905 0.01110 0.72441 0.73551 — 3,724.10 3,724.10 0.04878 0.29197 3.83012 3,816.162031 0.68089 0.57757 1.65360 7.58108 0.00830 0.00830 2.73934 2.74764 0.00830 0.65471 0.66300 — 3,157.00 3,157.00 0.04226 0.23612 2.99974 3,231.41Annual — — — — — — — — — — — — — — — — — —2028 0.00656 0.00438 0.10859 0.06514 0.00051 0.00092 0.02707 0.02799 0.00092 0.00721 0.00812 — 70.0236 70.0236 0.00154 0.01040 0.06127 73.22322029 0.13753 0.11463 0.42019 1.58268 0.00202 0.00216 0.51312 0.51528 0.00216 0.12340 0.12557 — 599.807 599.807 0.00857 0.04926 0.67201 615.3742030 0.14021 0.11811 0.40548 1.61038 0.00203 0.00203 0.55078 0.55280 0.00203 0.13220 0.13423 — 616.567 616.567 0.00808 0.04834 0.63412 631.8082031 0.12426 0.10541 0.30178 1.38355 0.00151 0.00151 0.49993 0.50144 0.00151 0.11948 0.12100 — 522.677 522.677 0.00700 0.03909 0.49664 534.998 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 17 / 112
2.2.4. Total Construction Emissions by Year, MitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 1.64211 1.52835 6.03755 29.3139 0.03893 0.10517 4.28599 4.39116 0.10116 1.02939 1.13054 — 7,857.09 7,857.09 0.16552 0.44374 13.9928 8,007.462030 1.57232 1.36317 5.90822 28.4838 0.03893 0.10201 4.28599 4.38801 0.09826 1.02939 1.12764 — 7,738.01 7,738.01 0.16552 0.42820 12.4217 7,882.172031 4.65980 4.36469 8.90363 42.2390 0.05461 0.18570 5.22103 5.40673 0.17711 1.24856 1.42567 — 10,124.5 10,124.5 0.23545 0.33098 13.0301 10,242.1Daily -Winter(Max) ——————————————————
2028 1.00258 0.90214 8.02945 37.3987 0.07644 0.18629 10.0705 10.2568 0.18315 3.88061 4.06376 — 8,946.62 8,946.62 0.31968 0.40296 0.12343 9,074.812029 1.63283 1.39907 7.88917 37.3288 0.07642 0.18300 10.0705 10.2535 0.18013 3.88061 4.06074 — 8,883.22 8,883.22 0.31760 0.44997 0.36252 9,006.732030 1.56456 1.34766 6.12551 27.2010 0.03893 0.10201 4.28599 4.38801 0.09826 1.02939 1.12764 — 7,587.28 7,587.28 0.17176 0.42820 0.32272 7,719.502031 4.15973 3.90475 6.85372 29.7157 0.04066 0.10883 5.02497 5.13380 0.10452 1.20260 1.30713 — 8,255.62 8,255.62 0.17967 0.45608 0.32722 8,396.35AverageDaily ——————————————————
2028 0.18106 0.16306 1.44294 6.73148 0.01376 0.03354 1.81123 1.84477 0.03297 0.69820 0.73117 — 1,610.89 1,610.89 0.05748 0.07247 0.37007 1,634.292029 1.12062 0.96029 4.55963 20.5809 0.03008 0.07984 3.37194 3.45178 0.07704 0.89815 0.97519 — 5,589.64 5,589.64 0.13153 0.31351 4.05897 5,690.422030 1.11082 0.95480 4.36559 19.4851 0.02781 0.07287 3.01796 3.09083 0.07018 0.72441 0.79459 — 5,436.12 5,436.12 0.11823 0.30586 3.83012 5,534.062031 2.50691 2.35605 4.26676 18.7883 0.02523 0.07748 2.73934 2.81682 0.07409 0.65471 0.72879 — 4,885.59 4,885.59 0.11238 0.25014 2.99974 4,965.94Annual — — — — — — — — — — — — — — — — — —2028 0.03304 0.02976 0.26334 1.22849 0.00251 0.00612 0.33055 0.33667 0.00602 0.12742 0.13344 — 266.701 266.701 0.00952 0.01200 0.06127 270.5762029 0.20451 0.17525 0.83213 3.75601 0.00549 0.01457 0.61538 0.62995 0.01406 0.16391 0.17797 — 925.429 925.429 0.02178 0.05191 0.67201 942.1142030 0.20272 0.17425 0.79672 3.55603 0.00507 0.01330 0.55078 0.56408 0.01281 0.13220 0.14501 — 900.013 900.013 0.01957 0.05064 0.63412 916.2262031 0.45751 0.42998 0.77868 3.42886 0.00460 0.01414 0.49993 0.51407 0.01352 0.11948 0.13300 — 808.864 808.864 0.01861 0.04141 0.49664 822.167
2.2.5. Onsite Construction Emissions by Year, Mitigated Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 18 / 112
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 0.00000 0.08963 0.08562 0.00000 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062030 0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 0.00000 0.08648 0.08272 0.00000 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062031 3.37090 3.26208 6.03211 26.5930 0.03907 0.17016 0.00000 0.17016 0.16157 0.00000 0.16157 — 4,040.98 4,040.98 0.16392 0.03278 0.00000 4,054.85Daily -Winter(Max) ——————————————————
2028 0.80605 0.77248 4.70961 35.4065 0.06093 0.15838 9.23636 9.39475 0.15525 3.65872 3.81397 — 6,598.26 6,598.26 0.26765 0.05353 0.00000 6,620.902029 0.80101 0.76825 4.69690 35.4078 0.06092 0.15510 9.23636 9.39146 0.15222 3.65872 3.81094 — 6,596.13 6,596.13 0.26757 0.05351 0.00000 6,618.772030 0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 0.00000 0.08648 0.08272 0.00000 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062031 2.92547 2.85747 3.76487 16.0234 0.02512 0.09329 0.00000 0.09329 0.08899 0.00000 0.08899 — 2,530.35 2,530.35 0.10264 0.02053 0.00000 2,539.03AverageDaily ——————————————————
2028 0.14512 0.13908 0.84791 6.37455 0.01097 0.02852 1.66291 1.69142 0.02795 0.65871 0.68666 — 1,187.95 1,187.95 0.04819 0.00964 0.00000 1,192.022029 0.36702 0.33217 2.25722 11.9087 0.01899 0.06799 0.56033 0.62832 0.06520 0.22196 0.28715 — 1,966.78 1,966.78 0.07978 0.01596 0.00000 1,973.522030 0.34257 0.30759 2.14378 10.6611 0.01671 0.06177 0.00000 0.06177 0.05909 0.00000 0.05909 — 1,712.02 1,712.02 0.06945 0.01389 0.00000 1,717.902031 1.82602 1.77847 2.61316 11.2072 0.01693 0.06918 0.00000 0.06918 0.06579 0.00000 0.06579 — 1,728.59 1,728.59 0.07012 0.01402 0.00000 1,734.52Annual — — — — — — — — — — — — — — — — — —2028 0.02648 0.02538 0.15474 1.16336 0.00200 0.00520 0.30348 0.30868 0.00510 0.12022 0.12532 — 196.678 196.678 0.00798 0.00160 0.00000 197.3532029 0.06698 0.06062 0.41194 2.17333 0.00347 0.01241 0.10226 0.11467 0.01190 0.04051 0.05241 — 325.622 325.622 0.01321 0.00264 0.00000 326.7402030 0.06252 0.05614 0.39124 1.94565 0.00305 0.01127 0.00000 0.01127 0.01078 0.00000 0.01078 — 283.445 283.445 0.01150 0.00230 0.00000 284.4182031 0.33325 0.32457 0.47690 2.04532 0.00309 0.01263 0.00000 0.01263 0.01201 0.00000 0.01201 — 286.188 286.188 0.01161 0.00232 0.00000 287.170
2.2.6. Offsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 19 / 112
Daily -Summer(Max)
——————————————————
2029 1.15493 1.09146 3.02008 14.3807 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,460.26 5,460.26 0.06830 0.42429 13.9928 5,602.402030 1.09272 0.93254 2.90692 13.5582 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,341.17 5,341.17 0.06830 0.40876 12.4217 5,477.112031 1.28890 1.10261 2.87151 15.6460 0.01554 0.01554 5.22103 5.23657 0.01554 1.24856 1.26410 — 6,083.54 6,083.54 0.07153 0.29819 13.0301 6,187.22Daily -Winter(Max) ——————————————————
2028 0.19653 0.12966 3.31983 1.99227 0.01550 0.02790 0.83413 0.86204 0.02790 0.22189 0.24980 — 2,348.35 2,348.35 0.05203 0.34943 0.12343 2,453.912029 1.14565 0.96218 3.37290 13.0247 0.01554 0.02790 4.28599 4.30153 0.02790 1.02939 1.04492 — 5,306.67 5,306.67 0.07453 0.43052 0.36252 5,437.192030 1.08497 0.91703 3.12421 12.2754 0.01554 0.01554 4.28599 4.30153 0.01554 1.02939 1.04492 — 5,190.45 5,190.45 0.07453 0.40876 0.32272 5,314.442031 1.23426 1.04728 3.08885 13.6924 0.01554 0.01554 5.02497 5.04051 0.01554 1.20260 1.21814 — 5,725.27 5,725.27 0.07702 0.43555 0.32722 5,857.32AverageDaily ——————————————————
2028 0.03594 0.02398 0.59503 0.35693 0.00279 0.00502 0.14832 0.15335 0.00502 0.03949 0.04451 — 422.946 422.946 0.00929 0.06283 0.37007 442.2722029 0.75359 0.62812 2.30241 8.67222 0.01109 0.01185 2.81162 2.82346 0.01185 0.67619 0.68804 — 3,622.87 3,622.87 0.05175 0.29756 4.05897 3,716.892030 0.76825 0.64721 2.22181 8.82400 0.01110 0.01110 3.01796 3.02905 0.01110 0.72441 0.73551 — 3,724.10 3,724.10 0.04878 0.29197 3.83012 3,816.162031 0.68089 0.57757 1.65360 7.58108 0.00830 0.00830 2.73934 2.74764 0.00830 0.65471 0.66300 — 3,157.00 3,157.00 0.04226 0.23612 2.99974 3,231.41Annual — — — — — — — — — — — — — — — — — —2028 0.00656 0.00438 0.10859 0.06514 0.00051 0.00092 0.02707 0.02799 0.00092 0.00721 0.00812 — 70.0236 70.0236 0.00154 0.01040 0.06127 73.22322029 0.13753 0.11463 0.42019 1.58268 0.00202 0.00216 0.51312 0.51528 0.00216 0.12340 0.12557 — 599.807 599.807 0.00857 0.04926 0.67201 615.3742030 0.14021 0.11811 0.40548 1.61038 0.00203 0.00203 0.55078 0.55280 0.00203 0.13220 0.13423 — 616.567 616.567 0.00808 0.04834 0.63412 631.8082031 0.12426 0.10541 0.30178 1.38355 0.00151 0.00151 0.49993 0.50144 0.00151 0.11948 0.12100 — 522.677 522.677 0.00700 0.03909 0.49664 534.998
2.3. Operations Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 20 / 112
Unmit. 27.6960 26.2672 12.5646 124.282 0.28687 0.41272 27.6726 28.0853 0.39620 7.01754 7.41375 303.189 34,447.6 34,750.8 32.1620 1.21710 3,335.23 39,252.8 Mit. 18.9886 18.1614 8.93211 63.9086 0.18839 0.32854 17.6205 17.9490 0.32216 4.46841 4.79057 102.602 24,171.2 24,273.8 11.7113 0.82435 3,312.93 28,125.1%Reduced 31% 31% 29% 49% 34% 20% 36% 36% 19% 36% 35% 66% 30% 30% 64% 32% 1% 28% Daily,Winter(Max)
——————————————————
Unmit. 24.3198 23.0884 13.4371 96.6633 0.27632 0.38616 27.6726 28.0587 0.37614 7.01754 7.39368 303.189 33,425.7 33,728.8 32.2311 1.28825 3,275.43 38,194.0Mit. 18.9366 18.0922 9.63077 62.3793 0.18249 0.32859 17.6205 17.9491 0.32220 4.46841 4.79061 102.602 23,563.9 23,666.5 11.7565 0.87000 3,274.85 27,494.5%Reduced 22% 22% 28% 35% 34% 15% 36% 36% 14% 36% 35% 66% 30% 30% 64% 32% < 0.5% 28% AverageDaily(Max)
——————————————————
Unmit. 25.8286 24.4980 13.3353 107.853 0.27840 0.39925 27.2707 27.6699 0.38603 6.91706 7.30309 303.189 33,613.6 33,916.8 32.2044 1.27111 3,300.35 38,401.0Mit. 18.8624 18.0252 9.49547 61.5876 0.18341 0.32856 17.3646 17.6931 0.32218 4.40443 4.72661 102.602 23,662.1 23,764.7 11.7390 0.85892 3,290.72 27,604.9%Reduced 27% 26% 29% 43% 34% 18% 36% 36% 17% 36% 35% 66% 30% 30% 64% 32% < 0.5% 28% Annual(Max)
——————————————————
Unmit. 4.71371 4.47088 2.43370 19.6832 0.05081 0.07286 4.97690 5.04976 0.07045 1.26236 1.33281 50.1963 5,565.12 5,615.31 5.33181 0.21045 546.410 6,357.73Mit. 3.44238 3.28961 1.73292 11.2397 0.03347 0.05996 3.16903 3.22899 0.05880 0.80381 0.86261 16.9870 3,917.54 3,934.52 1.94352 0.14220 544.816 4,570.30%Reduced 27% 26% 29% 43% 34% 18% 36% 36% 17% 36% 35% 66% 30% 30% 64% 32% < 0.5% 28%
2.4. Operations Emissions by Sector, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Mobile 13.4192 12.3795 9.39943 96.9603 0.26763 0.15851 27.6726 27.8311 0.14849 7.01754 7.16603 — 27,263.6 27,263.6 1.00066 1.06849 61.3991 27,668.4 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 21 / 112
Area 13.9474 13.7230 0.22363 25.1948 0.00128 0.02663 — 0.02663 0.02014 — 0.02014 0.00000 83.7961 83.7961 0.00351 0.00071 — 84.0950 Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 7,009.17 7,009.17 0.75102 0.05943 — 7,045.66Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 267.449 0.00000 267.449 26.7305 0.00000 — 935.712Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 27.6960 26.2672 12.5646 124.282 0.28687 0.41272 27.6726 28.0853 0.39620 7.01754 7.41375 303.189 34,447.6 34,750.8 32.1620 1.21710 3,335.23 39,252.8Daily,Winter(Max) ——————————————————
Mobile 13.3380 12.2714 10.4955 94.5364 0.25835 0.15858 27.6726 27.8312 0.14856 7.01754 7.16610 — 26,325.4 26,325.4 1.07333 1.14034 1.59204 26,693.7Area 10.6524 10.6524 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 7,009.17 7,009.17 0.75102 0.05943 — 7,045.66Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 267.449 0.00000 267.449 26.7305 0.00000 — 935.712Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 24.3198 23.0884 13.4371 96.6633 0.27632 0.38616 27.6726 28.0587 0.37614 7.01754 7.39368 303.189 33,425.7 33,728.8 32.2311 1.28825 3,275.43 38,194.0AverageDaily ——————————————————
Mobile 13.2218 12.1666 10.2835 93.3016 0.25980 0.15854 27.2707 27.4292 0.14852 6.91706 7.06558 — 26,472.0 26,472.0 1.04489 1.12286 26.5117 26,859.3Area 12.2773 12.1667 0.11028 12.4248 0.00063 0.01313 — 0.01313 0.00993 — 0.00993 0.00000 41.3241 41.3241 0.00173 0.00035 — 41.4715Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 7,009.17 7,009.17 0.75102 0.05943 — 7,045.66Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 267.449 0.00000 267.449 26.7305 0.00000 — 935.712Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 25.8286 24.4980 13.3353 107.853 0.27840 0.39925 27.2707 27.6699 0.38603 6.91706 7.30309 303.189 33,613.6 33,916.8 32.2044 1.27111 3,300.35 38,401.0Annual — — — — — — — — — — — — — — — — — —Mobile 2.41298 2.22040 1.87674 17.0276 0.04741 0.02893 4.97690 5.00583 0.02710 1.26236 1.28947 — 4,382.75 4,382.75 0.17299 0.18590 4.38931 4,446.86Area 2.24062 2.22042 0.02013 2.26753 0.00012 0.00240 — 0.00240 0.00181 — 0.00181 0.00000 6.84168 6.84168 0.00029 0.00006 — 6.86608Energy 0.06011 0.03006 0.53683 0.38816 0.00328 0.04153 — 0.04153 0.04153 — 0.04153 — 1,160.45 1,160.45 0.12434 0.00984 — 1,166.49 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 22 / 112
Water — — — — — — — — — — — 5.91717 15.0775 20.9946 0.60865 0.01465 — 40.5756 Waste — — — — — — — — — — — 44.2792 0.00000 44.2792 4.42554 0.00000 — 154.918Refrig. — — — — — — — — — — — — — — — — 542.021 542.021Total 4.71371 4.47088 2.43370 19.6832 0.05081 0.07286 4.97690 5.04976 0.07045 1.26236 1.33281 50.1963 5,565.12 5,615.31 5.33181 0.21045 546.410 6,357.73
2.5. Operations Emissions by Sector, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Mobile 8.56904 7.90654 5.99059 61.7817 0.17043 0.10096 17.6205 17.7214 0.09458 4.46841 4.56299 — 17,361.4 17,361.4 0.63816 0.68090 39.0958 17,619.4Area 10.0901 10.0901 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 6,718.68 6,718.68 0.71426 0.05498 — 6,752.92Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 66.8622 0.00000 66.8622 6.68263 0.00000 — 233.928Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 18.9886 18.1614 8.93211 63.9086 0.18839 0.32854 17.6205 17.9490 0.32216 4.46841 4.79057 102.602 24,171.2 24,273.8 11.7113 0.82435 3,312.93 28,125.1Daily,Winter(Max) ——————————————————
Mobile 8.51712 7.83736 6.68925 60.2523 0.16452 0.10101 17.6205 17.7215 0.09462 4.46841 4.56303 — 16,764.1 16,764.1 0.68463 0.72671 1.01373 16,998.8Area 10.0901 10.0901 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 6,708.69 6,708.69 0.71300 0.05482 — 6,742.85Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 66.8622 0.00000 66.8622 6.68263 0.00000 — 233.928Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 18.9366 18.0922 9.63077 62.3793 0.18249 0.32859 17.6205 17.9491 0.32220 4.46841 4.79061 102.602 23,563.9 23,666.5 11.7565 0.87000 3,274.85 27,494.5AverageDaily ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 23 / 112
Mobile 8.44285 7.77042 6.55395 59.4607 0.16544 0.10098 17.3646 17.4655 0.09460 4.40443 4.49902 — 16,857.4 16,857.4 0.66645 0.71555 16.8813 17,104.2 Area 10.0901 10.0901 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Energy 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 6,713.61 6,713.61 0.71362 0.05490 — 6,747.82Water — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Waste — — — — — — — — — — — 66.8622 0.00000 66.8622 6.68263 0.00000 — 233.928Refrig. — — — — — — — — — — — — — — — — 3,273.83 3,273.83Total 18.8624 18.0252 9.49547 61.5876 0.18341 0.32856 17.3646 17.6931 0.32218 4.40443 4.72661 102.602 23,662.1 23,764.7 11.7390 0.85892 3,290.72 27,604.9Annual — — — — — — — — — — — — — — — — — —Mobile 1.54082 1.41810 1.19610 10.8516 0.03019 0.01843 3.16903 3.18746 0.01726 0.80381 0.82107 — 2,790.94 2,790.94 0.11034 0.11847 2.79489 2,831.80Area 1.84145 1.84145 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Energy 0.06011 0.03006 0.53683 0.38816 0.00328 0.04153 — 0.04153 0.04153 — 0.04153 — 1,111.52 1,111.52 0.11815 0.00909 — 1,117.18Water — — — — — — — — — — — 5.91717 15.0775 20.9946 0.60865 0.01465 — 40.5756Waste — — — — — — — — — — — 11.0698 0.00000 11.0698 1.10639 0.00000 — 38.7294Refrig. — — — — — — — — — — — — — — — — 542.021 542.021Total 3.44238 3.28961 1.73292 11.2397 0.03347 0.05996 3.16903 3.22899 0.05880 0.80381 0.86261 16.9870 3,917.54 3,934.52 1.94352 0.14220 544.816 4,570.30
3. Construction Emissions Details3.1. Grading (2028)3.1.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 24 / 112
6,620.90
— 0.05353 0.26765 6,598.26 6,598.26
— 0.15525
— 0.15525 0.15838
— 0.15838 0.06093 35.4065 4.70961 0.77248 0.80605 Off-Roa d
DustFromMaterialMovement
— — — — — — 9.23636 9.23636 — 3.65872 3.65872 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.14512 0.13908 0.84791 6.37455 0.01097 0.02852 — 0.02852 0.02795 — 0.02795 — 1,187.95 1,187.95 0.04819 0.00964 — 1,192.02 DustFromMaterialMovement
— — — — — — 1.66291 1.66291 — 0.65871 0.65871 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.02648 0.02538 0.15474 1.16336 0.00200 0.00520 — 0.00520 0.00510 — 0.00510 — 196.678 196.678 0.00798 0.00160 — 197.353 DustFromMaterialMovement
— — — — — — 0.30348 0.30348 — 0.12022 0.12022 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 25 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Daily,Winter(Max)
——————————————————
Worker 0.07716 0.07540 0.07981 0.93035 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 241.711 241.711 0.00397 0.00992 0.02088 244.787Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.11937 0.05426 3.24002 1.06192 0.01550 0.02790 0.57271 0.60062 0.02790 0.16062 0.18852 — 2,106.64 2,106.64 0.04806 0.33950 0.10255 2,209.12AverageDaily ——————————————————
Worker 0.01389 0.01365 0.01421 0.16825 0.00000 0.00000 0.04638 0.04638 0.00000 0.01086 0.01086 — 43.8338 43.8338 0.00064 0.00171 0.06258 44.4209Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.02205 0.01033 0.58082 0.18868 0.00279 0.00502 0.10194 0.10697 0.00502 0.02863 0.03365 — 379.112 379.112 0.00865 0.06112 0.30748 397.851Annual — — — — — — — — — — — — — — — — — —Worker 0.00254 0.00249 0.00259 0.03071 0.00000 0.00000 0.00846 0.00846 0.00000 0.00198 0.00198 — 7.25719 7.25719 0.00011 0.00028 0.01036 7.35439Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00402 0.00188 0.10600 0.03443 0.00051 0.00092 0.01860 0.01952 0.00092 0.00522 0.00614 — 62.7664 62.7664 0.00143 0.01012 0.05091 65.8688
3.1.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.80605 0.77248 4.70961 35.4065 0.06093 0.15838 — 0.15838 0.15525 — 0.15525 — 6,598.26 6,598.26 0.26765 0.05353 — 6,620.90 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 26 / 112
—
—
—
—
—
—
— 3.65872 3.65872
— 9.23636 9.23636
—
—
—
—
—
— Dust
FromMaterialMovement
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.14512 0.13908 0.84791 6.37455 0.01097 0.02852 — 0.02852 0.02795 — 0.02795 — 1,187.95 1,187.95 0.04819 0.00964 — 1,192.02 DustFromMaterialMovement
— — — — — — 1.66291 1.66291 — 0.65871 0.65871 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.02648 0.02538 0.15474 1.16336 0.00200 0.00520 — 0.00520 0.00510 — 0.00510 — 196.678 196.678 0.00798 0.00160 — 197.353 DustFromMaterialMovement
— — — — — — 0.30348 0.30348 — 0.12022 0.12022 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 27 / 112
Daily,Winter(Max)
——————————————————
Worker 0.07716 0.07540 0.07981 0.93035 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 241.711 241.711 0.00397 0.00992 0.02088 244.787Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.11937 0.05426 3.24002 1.06192 0.01550 0.02790 0.57271 0.60062 0.02790 0.16062 0.18852 — 2,106.64 2,106.64 0.04806 0.33950 0.10255 2,209.12AverageDaily ——————————————————
Worker 0.01389 0.01365 0.01421 0.16825 0.00000 0.00000 0.04638 0.04638 0.00000 0.01086 0.01086 — 43.8338 43.8338 0.00064 0.00171 0.06258 44.4209Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.02205 0.01033 0.58082 0.18868 0.00279 0.00502 0.10194 0.10697 0.00502 0.02863 0.03365 — 379.112 379.112 0.00865 0.06112 0.30748 397.851Annual — — — — — — — — — — — — — — — — — —Worker 0.00254 0.00249 0.00259 0.03071 0.00000 0.00000 0.00846 0.00846 0.00000 0.00198 0.00198 — 7.25719 7.25719 0.00011 0.00028 0.01036 7.35439Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00402 0.00188 0.10600 0.03443 0.00051 0.00092 0.01860 0.01952 0.00092 0.00522 0.00614 — 62.7664 62.7664 0.00143 0.01012 0.05091 65.8688
3.2. Grading (2029)3.2.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.80101 0.76825 4.69690 35.4078 0.06092 0.15510 — 0.15510 0.15222 — 0.15222 — 6,596.13 6,596.13 0.26757 0.05351 — 6,618.77 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 28 / 112
—
—
—
—
—
—
— 3.65872 3.65872
— 9.23636 9.23636
—
—
—
—
—
— Dust
FromMaterialMovement
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04859 0.04661 0.28494 2.14802 0.00370 0.00941 — 0.00941 0.00923 — 0.00923 — 400.157 400.157 0.01623 0.00325 — 401.530 DustFromMaterialMovement
— — — — — — 0.56033 0.56033 — 0.22196 0.22196 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00887 0.00851 0.05200 0.39201 0.00067 0.00172 — 0.00172 0.00169 — 0.00169 — 66.2505 66.2505 0.00269 0.00054 — 66.4779 DustFromMaterialMovement
— — — — — — 0.10226 0.10226 — 0.04051 0.04051 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 29 / 112
Daily,Winter(Max)
——————————————————
Worker 0.07496 0.06504 0.07937 0.86994 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 237.512 237.512 0.00353 0.00992 0.01878 240.576Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.11937 0.05426 3.11290 1.05107 0.01550 0.02790 0.57271 0.60062 0.02790 0.16062 0.18852 — 2,049.57 2,049.57 0.04651 0.32400 0.09397 2,147.38AverageDaily ——————————————————
Worker 0.00449 0.00389 0.00427 0.05311 0.00000 0.00000 0.01563 0.01563 0.00000 0.00366 0.00366 — 14.5135 14.5135 0.00021 0.00058 0.01896 14.7092Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00743 0.00348 0.18800 0.06292 0.00094 0.00169 0.03435 0.03604 0.00169 0.00965 0.01134 — 124.279 124.279 0.00282 0.01966 0.09489 130.302Annual — — — — — — — — — — — — — — — — — —Worker 0.00082 0.00071 0.00078 0.00969 0.00000 0.00000 0.00285 0.00285 0.00000 0.00067 0.00067 — 2.40288 2.40288 0.00004 0.00010 0.00314 2.43528Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00136 0.00064 0.03431 0.01148 0.00017 0.00031 0.00627 0.00658 0.00031 0.00176 0.00207 — 20.5758 20.5758 0.00047 0.00325 0.01571 21.5729
3.2.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.80101 0.76825 4.69690 35.4078 0.06092 0.15510 — 0.15510 0.15222 — 0.15222 — 6,596.13 6,596.13 0.26757 0.05351 — 6,618.77 DustFromMaterialMovement
— — — — — — 9.23636 9.23636 — 3.65872 3.65872 ———————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 30 / 112
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04859 0.04661 0.28494 2.14802 0.00370 0.00941 — 0.00941 0.00923 — 0.00923 — 400.157 400.157 0.01623 0.00325 — 401.530 DustFromMaterialMovement
— — — — — — 0.56033 0.56033 — 0.22196 0.22196 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00887 0.00851 0.05200 0.39201 0.00067 0.00172 — 0.00172 0.00169 — 0.00169 — 66.2505 66.2505 0.00269 0.00054 — 66.4779 DustFromMaterialMovement
— — — — — — 0.10226 0.10226 — 0.04051 0.04051 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.07496 0.06504 0.07937 0.86994 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 237.512 237.512 0.00353 0.00992 0.01878 240.576 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 31 / 112
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.11937 0.05426 3.11290 1.05107 0.01550 0.02790 0.57271 0.60062 0.02790 0.16062 0.18852 — 2,049.57 2,049.57 0.04651 0.32400 0.09397 2,147.38AverageDaily ——————————————————
Worker 0.00449 0.00389 0.00427 0.05311 0.00000 0.00000 0.01563 0.01563 0.00000 0.00366 0.00366 — 14.5135 14.5135 0.00021 0.00058 0.01896 14.7092Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00743 0.00348 0.18800 0.06292 0.00094 0.00169 0.03435 0.03604 0.00169 0.00965 0.01134 — 124.279 124.279 0.00282 0.01966 0.09489 130.302Annual — — — — — — — — — — — — — — — — — —Worker 0.00082 0.00071 0.00078 0.00969 0.00000 0.00000 0.00285 0.00285 0.00000 0.00067 0.00067 — 2.40288 2.40288 0.00004 0.00010 0.00314 2.43528Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00136 0.00064 0.03431 0.01148 0.00017 0.00031 0.00627 0.00658 0.00031 0.00176 0.00207 — 20.5758 20.5758 0.00047 0.00325 0.01571 21.5729
3.3. Building Construction (2029)3.3.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 — 0.08963 0.08562 — 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 — 0.08963 0.08562 — 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 32 / 112
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.31843 0.28557 1.97228 9.76066 0.01529 0.05858 — 0.05858 0.05596 — 0.05596 — 1,566.62 1,566.62 0.06355 0.01271 — 1,571.99 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.05811 0.05212 0.35994 1.78132 0.00279 0.01069 — 0.01069 0.01021 — 0.01021 — 259.372 259.372 0.01052 0.00210 — 260.262 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 1.06568 1.04698 0.86002 13.6731 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,511.71 3,511.71 0.04362 0.13399 10.2383 3,562.97Vendor 0.08925 0.04447 2.16006 0.70763 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,948.55 1,948.55 0.02467 0.29030 3.75449 2,039.43Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 1.05944 0.91922 1.12177 12.2958 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,357.00 3,357.00 0.04986 0.14022 0.26544 3,400.30Vendor 0.08621 0.04295 2.25114 0.72895 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,949.67 1,949.67 0.02467 0.29030 0.09708 2,036.89Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 33 / 112
AverageDaily
——————————————————
Worker 0.68433 0.59268 0.64970 8.08770 0.00000 0.00000 2.38001 2.38001 0.00000 0.55732 0.55732 — 2,210.16 2,210.16 0.03259 0.08758 2.88800 2,239.96Vendor 0.05734 0.02807 1.46044 0.46850 0.01015 0.01015 0.38163 0.39179 0.01015 0.10556 0.11572 — 1,273.92 1,273.92 0.01613 0.18975 1.05711 1,331.92Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.12489 0.10816 0.11857 1.47600 0.00000 0.00000 0.43435 0.43435 0.00000 0.10171 0.10171 — 365.917 365.917 0.00540 0.01450 0.47814 370.851Vendor 0.01046 0.00512 0.26653 0.08550 0.00185 0.00185 0.06965 0.07150 0.00185 0.01927 0.02112 — 210.912 210.912 0.00267 0.03141 0.17502 220.515Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 — 0.08963 0.08562 — 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.48718 0.43690 3.01747 14.9332 0.02340 0.08963 — 0.08963 0.08562 — 0.08562 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 34 / 112
Off-RoaEquipment
0.31843 0.28557 1.97228 9.76066 0.01529 0.05858 — 0.05858 0.05596 — 0.05596 — 1,566.62 1,566.62 0.06355 0.01271 — 1,571.99 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.05811 0.05212 0.35994 1.78132 0.00279 0.01069 — 0.01069 0.01021 — 0.01021 — 259.372 259.372 0.01052 0.00210 — 260.262 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 1.06568 1.04698 0.86002 13.6731 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,511.71 3,511.71 0.04362 0.13399 10.2383 3,562.97Vendor 0.08925 0.04447 2.16006 0.70763 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,948.55 1,948.55 0.02467 0.29030 3.75449 2,039.43Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 1.05944 0.91922 1.12177 12.2958 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,357.00 3,357.00 0.04986 0.14022 0.26544 3,400.30Vendor 0.08621 0.04295 2.25114 0.72895 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,949.67 1,949.67 0.02467 0.29030 0.09708 2,036.89Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.68433 0.59268 0.64970 8.08770 0.00000 0.00000 2.38001 2.38001 0.00000 0.55732 0.55732 — 2,210.16 2,210.16 0.03259 0.08758 2.88800 2,239.96Vendor 0.05734 0.02807 1.46044 0.46850 0.01015 0.01015 0.38163 0.39179 0.01015 0.10556 0.11572 — 1,273.92 1,273.92 0.01613 0.18975 1.05711 1,331.92Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 35 / 112
Annual — — — — — — — — — — — — — — — — — —
Worker 0.12489 0.10816 0.11857 1.47600 0.00000 0.00000 0.43435 0.43435 0.00000 0.10171 0.10171 — 365.917 365.917 0.00540 0.01450 0.47814 370.851Vendor 0.01046 0.00512 0.26653 0.08550 0.00185 0.00185 0.06965 0.07150 0.00185 0.01927 0.02112 — 210.912 210.912 0.00267 0.03141 0.17502 220.515Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Building Construction (2030)3.4.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 — 0.08648 0.08272 — 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 — 0.08648 0.08272 — 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.34257 0.30759 2.14378 10.6611 0.01671 0.06177 — 0.06177 0.05909 — 0.05909 — 1,712.02 1,712.02 0.06945 0.01389 — 1,717.90 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 36 / 112
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.06252 0.05614 0.39124 1.94565 0.00305 0.01127 — 0.01127 0.01078 — 0.01078 — 283.445 283.445 0.01150 0.00230 — 284.418 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 1.02205 0.88806 0.85379 12.8691 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,452.71 3,452.71 0.04362 0.13399 9.13370 3,502.87Vendor 0.07067 0.04447 2.05314 0.68905 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,888.46 1,888.46 0.02467 0.27477 3.28795 1,974.24Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 1.01582 0.87560 0.99401 11.5635 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,300.80 3,300.80 0.04986 0.13399 0.23741 3,342.22Vendor 0.06915 0.04143 2.13020 0.71190 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,889.65 1,889.65 0.02467 0.27477 0.08531 1,972.23Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.71668 0.61653 0.70110 8.32421 0.00000 0.00000 2.60091 2.60091 0.00000 0.60905 0.60905 — 2,374.85 2,374.85 0.03116 0.09571 2.81454 2,406.96Vendor 0.05157 0.03068 1.52070 0.49979 0.01110 0.01110 0.41705 0.42815 0.01110 0.11536 0.12646 — 1,349.26 1,349.26 0.01762 0.19626 1.01558 1,409.20Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.13079 0.11252 0.12795 1.51917 0.00000 0.00000 0.47467 0.47467 0.00000 0.11115 0.11115 — 393.183 393.183 0.00516 0.01585 0.46598 398.500 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 37 / 112
Vendor 0.00941 0.00560 0.27753 0.09121 0.00203 0.00203 0.07611 0.07814 0.00203 0.02105 0.02308 — 223.385 223.385 0.00292 0.03249 0.16814 233.309 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 — 0.08648 0.08272 — 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.47959 0.43063 3.00129 14.9256 0.02340 0.08648 — 0.08648 0.08272 — 0.08272 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.34257 0.30759 2.14378 10.6611 0.01671 0.06177 — 0.06177 0.05909 — 0.05909 — 1,712.02 1,712.02 0.06945 0.01389 — 1,717.90 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 38 / 112
284.418
— 0.00230 0.01150 283.445 283.445
— 0.01078
— 0.01078 0.01127
— 0.01127 0.00305 1.94565 0.39124 0.05614 0.06252 Off-Roa dEquipm
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 1.02205 0.88806 0.85379 12.8691 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,452.71 3,452.71 0.04362 0.13399 9.13370 3,502.87Vendor 0.07067 0.04447 2.05314 0.68905 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,888.46 1,888.46 0.02467 0.27477 3.28795 1,974.24Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 1.01582 0.87560 0.99401 11.5635 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,300.80 3,300.80 0.04986 0.13399 0.23741 3,342.22Vendor 0.06915 0.04143 2.13020 0.71190 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,889.65 1,889.65 0.02467 0.27477 0.08531 1,972.23Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.71668 0.61653 0.70110 8.32421 0.00000 0.00000 2.60091 2.60091 0.00000 0.60905 0.60905 — 2,374.85 2,374.85 0.03116 0.09571 2.81454 2,406.96Vendor 0.05157 0.03068 1.52070 0.49979 0.01110 0.01110 0.41705 0.42815 0.01110 0.11536 0.12646 — 1,349.26 1,349.26 0.01762 0.19626 1.01558 1,409.20Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.13079 0.11252 0.12795 1.51917 0.00000 0.00000 0.47467 0.47467 0.00000 0.11115 0.11115 — 393.183 393.183 0.00516 0.01585 0.46598 398.500Vendor 0.00941 0.00560 0.27753 0.09121 0.00203 0.00203 0.07611 0.07814 0.00203 0.02105 0.02308 — 223.385 223.385 0.00292 0.03249 0.16814 233.309Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 39 / 112
3.5. Building Construction (2031)3.5.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.25316 0.22753 1.59631 7.97092 0.01250 0.04481 — 0.04481 0.04291 — 0.04291 — 1,280.50 1,280.50 0.05194 0.01039 — 1,284.89 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.04620 0.04153 0.29133 1.45469 0.00228 0.00818 — 0.00818 0.00783 — 0.00783 — 212.001 212.001 0.00860 0.00172 — 212.729 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 40 / 112
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.97220 0.84444 0.72603 11.9499 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,398.02 3,398.02 0.03739 0.01870 8.11152 3,412.64Vendor 0.07067 0.04447 1.96175 0.67199 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,825.61 1,825.61 0.02467 0.27477 2.86585 1,910.97Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.97220 0.83821 0.87248 10.8313 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,248.68 3,248.68 0.04362 0.13399 0.21103 3,289.91Vendor 0.06763 0.04143 2.04186 0.69484 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,826.85 1,826.85 0.02467 0.27477 0.07398 1,909.42Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.51606 0.44448 0.45946 5.78324 0.00000 0.00000 1.94534 1.94534 0.00000 0.45554 0.45554 — 1,748.18 1,748.18 0.02331 0.07158 1.87611 1,771.97Vendor 0.03694 0.02295 1.08028 0.36470 0.00830 0.00830 0.31193 0.32023 0.00830 0.08628 0.09458 — 975.606 975.606 0.01318 0.14679 0.65872 1,020.34Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.09418 0.08112 0.08385 1.05544 0.00000 0.00000 0.35502 0.35502 0.00000 0.08314 0.08314 — 289.431 289.431 0.00386 0.01185 0.31061 293.369Vendor 0.00674 0.00419 0.19715 0.06656 0.00151 0.00151 0.05693 0.05844 0.00151 0.01575 0.01726 — 161.523 161.523 0.00218 0.02430 0.10906 168.929Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 41 / 112
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.25316 0.22753 1.59631 7.97092 0.01250 0.04481 — 0.04481 0.04291 — 0.04291 — 1,280.50 1,280.50 0.05194 0.01039 — 1,284.89 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.04620 0.04153 0.29133 1.45469 0.00228 0.00818 — 0.00818 0.00783 — 0.00783 — 212.001 212.001 0.00860 0.00172 — 212.729 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.4. Offsite - Mitigated
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 42 / 112
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.97220 0.84444 0.72603 11.9499 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,398.02 3,398.02 0.03739 0.01870 8.11152 3,412.64Vendor 0.07067 0.04447 1.96175 0.67199 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,825.61 1,825.61 0.02467 0.27477 2.86585 1,910.97Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.97220 0.83821 0.87248 10.8313 0.00000 0.00000 3.69489 3.69489 0.00000 0.86608 0.86608 — 3,248.68 3,248.68 0.04362 0.13399 0.21103 3,289.91Vendor 0.06763 0.04143 2.04186 0.69484 0.01554 0.01554 0.59110 0.60663 0.01554 0.16331 0.17885 — 1,826.85 1,826.85 0.02467 0.27477 0.07398 1,909.42Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.51606 0.44448 0.45946 5.78324 0.00000 0.00000 1.94534 1.94534 0.00000 0.45554 0.45554 — 1,748.18 1,748.18 0.02331 0.07158 1.87611 1,771.97Vendor 0.03694 0.02295 1.08028 0.36470 0.00830 0.00830 0.31193 0.32023 0.00830 0.08628 0.09458 — 975.606 975.606 0.01318 0.14679 0.65872 1,020.34Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.09418 0.08112 0.08385 1.05544 0.00000 0.00000 0.35502 0.35502 0.00000 0.08314 0.08314 — 289.431 289.431 0.00386 0.01185 0.31061 293.369Vendor 0.00674 0.00419 0.19715 0.06656 0.00151 0.00151 0.05693 0.05844 0.00151 0.01575 0.01726 — 161.523 161.523 0.00218 0.02430 0.10906 168.929Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6. Paving (2031)3.6.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 43 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Off-RoadEquipment
0.37204 0.33122 2.26724 10.5696 0.01395 0.07687 — 0.07687 0.07258 — 0.07258 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 0.07339 0.07339 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.37204 0.33122 2.26724 10.5696 0.01395 0.07687 — 0.07687 0.07258 — 0.07258 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 0.07339 0.07339 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.09072 0.08076 0.55283 2.57725 0.00340 0.01874 — 0.01874 0.01770 — 0.01770 — 368.345 368.345 0.01494 0.00299 — 369.609 Paving 0.01789 0.01789 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01656 0.01474 0.10089 0.47035 0.00062 0.00342 — 0.00342 0.00323 — 0.00323 — 60.9837 60.9837 0.00247 0.00049 — 61.1930 Paving 0.00327 0.00327 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 44 / 112
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
— 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Onsite truck
3.6.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.05159 0.04481 0.03853 0.63410 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 180.311 180.311 0.00198 0.00099 0.43043 181.087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.05159 0.04448 0.04630 0.57475 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 172.387 172.387 0.00231 0.00711 0.01120 174.574Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01250 0.01076 0.01113 0.14006 0.00000 0.00000 0.04711 0.04711 0.00000 0.01103 0.01103 — 42.3386 42.3386 0.00056 0.00173 0.04544 42.9148Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00228 0.00196 0.00203 0.02556 0.00000 0.00000 0.00860 0.00860 0.00000 0.00201 0.00201 — 7.00965 7.00965 0.00009 0.00029 0.00752 7.10504Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 45 / 112
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.37204 0.33122 2.26724 10.5696 0.01395 0.07687 — 0.07687 0.07258 — 0.07258 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 0.07339 0.07339 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.37204 0.33122 2.26724 10.5696 0.01395 0.07687 — 0.07687 0.07258 — 0.07258 — 1,510.63 1,510.63 0.06128 0.01226 — 1,515.81 Paving 0.07339 0.07339 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.09072 0.08076 0.55283 2.57725 0.00340 0.01874 — 0.01874 0.01770 — 0.01770 — 368.345 368.345 0.01494 0.00299 — 369.609 Paving 0.01789 0.01789 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01656 0.01474 0.10089 0.47035 0.00062 0.00342 — 0.00342 0.00323 — 0.00323 — 60.9837 60.9837 0.00247 0.00049 — 61.1930 Paving 0.00327 0.00327 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 46 / 112
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.05159 0.04481 0.03853 0.63410 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 180.311 180.311 0.00198 0.00099 0.43043 181.087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.05159 0.04448 0.04630 0.57475 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 172.387 172.387 0.00231 0.00711 0.01120 174.574Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01250 0.01076 0.01113 0.14006 0.00000 0.00000 0.04711 0.04711 0.00000 0.01103 0.01103 — 42.3386 42.3386 0.00056 0.00173 0.04544 42.9148Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00228 0.00196 0.00203 0.02556 0.00000 0.00000 0.00860 0.00860 0.00000 0.00201 0.00201 — 7.00965 7.00965 0.00009 0.00029 0.00752 7.10504Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7. Architectural Coating (2031)
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 47 / 112
3.7.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
11.7502 11.7502 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
11.7502 11.7502 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.06894 0.05697 0.46401 0.65905 0.00103 0.00563 — 0.00563 0.00518 — 0.00518 — 79.7448 79.7448 0.00323 0.00065 — 80.0184 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 48 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— 7.01792 7.01792 Architect
ural
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01258 0.01040 0.08468 0.12028 0.00019 0.00103 — 0.00103 0.00095 — 0.00095 — 13.2027 13.2027 0.00054 0.00011 — 13.2480 ArchitecturalCoatings
1.28077 1.28077 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.19444 0.16889 0.14521 2.38998 0.00000 0.00000 0.73898 0.73898 0.00000 0.17322 0.17322 — 679.604 679.604 0.00748 0.00374 1.62230 682.527Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.19444 0.16764 0.17450 2.16625 0.00000 0.00000 0.73898 0.73898 0.00000 0.17322 0.17322 — 649.737 649.737 0.00872 0.02680 0.04221 657.983Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 49 / 112
Worker 0.11539 0.09938 0.10273 1.29307 0.00000 0.00000 0.43496 0.43496 0.00000 0.10185 0.10185 — 390.875 390.875 0.00521 0.01601 0.41948 396.194 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.02106 0.01814 0.01875 0.23599 0.00000 0.00000 0.07938 0.07938 0.00000 0.01859 0.01859 — 64.7137 64.7137 0.00086 0.00265 0.06945 65.5944Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
2.33618 2.33618 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 50 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— 2.33618 2.33618 Architect
uralCoatings
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.06894 0.05697 0.46401 0.65905 0.00103 0.00563 — 0.00563 0.00518 — 0.00518 — 79.7448 79.7448 0.00323 0.00065 — 80.0184 ArchitecturalCoatings
1.39531 1.39531 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01258 0.01040 0.08468 0.12028 0.00019 0.00103 — 0.00103 0.00095 — 0.00095 — 13.2027 13.2027 0.00054 0.00011 — 13.2480 ArchitecturalCoatings
0.25464 0.25464 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 51 / 112
Worker 0.19444 0.16889 0.14521 2.38998 0.00000 0.00000 0.73898 0.73898 0.00000 0.17322 0.17322 — 679.604 679.604 0.00748 0.00374 1.62230 682.527 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.19444 0.16764 0.17450 2.16625 0.00000 0.00000 0.73898 0.73898 0.00000 0.17322 0.17322 — 649.737 649.737 0.00872 0.02680 0.04221 657.983Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.11539 0.09938 0.10273 1.29307 0.00000 0.00000 0.43496 0.43496 0.00000 0.10185 0.10185 — 390.875 390.875 0.00521 0.01601 0.41948 396.194Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.02106 0.01814 0.01875 0.23599 0.00000 0.00000 0.07938 0.07938 0.00000 0.01859 0.01859 — 64.7137 64.7137 0.00086 0.00265 0.06945 65.5944Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details4.1. Mobile Emissions by Land Use4.1.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel 3.15726 2.91739 2.17323 22.3700 0.06140 0.03644 6.34436 6.38080 0.03414 1.60888 1.64302 — 6,255.21 6,255.21 0.23268 0.24676 14.0767 6,348.64 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 52 / 112
ApartmeHighRise
4.11036 3.77786 2.99192 31.0050 0.08659 0.05106 8.96696 9.01803 0.04784 2.27395 2.32179 — 8,820.79 8,820.79 0.31462 0.34094 19.8956 8,950.15 Supermarket
1.43473 1.32573 0.98756 10.1654 0.02790 0.01656 2.88301 2.89957 0.01551 0.73111 0.74662 — 2,842.50 2,842.50 0.10574 0.11213 6.39674 2,884.96 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 FastFoodRestaurantw/o DriveThru
3.89887 3.60266 2.68369 27.6244 0.07583 0.04500 7.83458 7.87958 0.04216 1.98678 2.02894 — 7,724.49 7,724.49 0.28734 0.30472 17.3831 7,839.86 HighTurnover(SitDownRestaurant)
0.81797 0.75583 0.56303 5.79552 0.01591 0.00944 1.64367 1.65311 0.00884 0.41682 0.42567 — 1,620.57 1,620.57 0.06028 0.06393 3.64693 1,644.78 Total 13.4192 12.3795 9.39943 96.9603 0.26763 0.15851 27.6726 27.8311 0.14849 7.01754 7.16603 — 27,263.6 27,263.6 1.00066 1.06849 61.3991 27,668.4Daily,Winter(Max) ——————————————————
Hotel 3.13785 2.89147 2.42688 21.8607 0.05928 0.03646 6.34436 6.38082 0.03415 1.60888 1.64303 — 6,040.22 6,040.22 0.25003 0.26342 0.36500 6,125.34ApartmentsHighRise
4.08645 3.74621 3.34017 30.0826 0.08358 0.05108 8.96696 9.01805 0.04786 2.27395 2.32181 — 8,516.52 8,516.52 0.33615 0.36368 0.51588 8,633.81 Supermarket
1.42590 1.31394 1.10283 9.93397 0.02694 0.01657 2.88301 2.89958 0.01552 0.73111 0.74663 — 2,744.81 2,744.81 0.11362 0.11970 0.16586 2,783.48 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 53 / 112
FastFoodRestaurantw/o DriveThru
3.87489 3.57064 2.99692 26.9955 0.07320 0.04502 7.83458 7.87960 0.04218 1.98678 2.02896 — 7,459.00 7,459.00 0.30876 0.32529 0.45073 7,564.11 HighTurnover(SitDownRestaurant)
0.81294 0.74911 0.62875 5.66359 0.01536 0.00945 1.64367 1.65312 0.00885 0.41682 0.42567 — 1,564.88 1,564.88 0.06478 0.06825 0.09456 1,586.93 Total 13.3380 12.2714 10.4955 94.5364 0.25835 0.15858 27.6726 27.8312 0.14856 7.01754 7.16610 — 26,325.4 26,325.4 1.07333 1.14034 1.59204 26,693.7Annual — — — — — — — — — — — — — — — — — —Hotel 0.56763 0.52317 0.43386 3.93461 0.01088 0.00665 1.14103 1.14768 0.00623 0.28942 0.29565 — 1,005.59 1,005.59 0.04027 0.04294 1.00632 1,020.39ApartmentsHighRise
0.73938 0.67789 0.59756 5.42680 0.01534 0.00932 1.61270 1.62202 0.00873 0.40905 0.41779 — 1,417.89 1,417.89 0.05425 0.05931 1.42230 1,438.35 Supermarket
0.25794 0.23774 0.19715 1.78797 0.00494 0.00302 0.51851 0.52153 0.00283 0.13152 0.13435 — 456.960 456.960 0.01830 0.01951 0.45729 463.689 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 FastFoodRestaurantw/o DriveThru
0.70096 0.64606 0.53577 4.85881 0.01343 0.00821 1.40904 1.41726 0.00769 0.35740 0.36509 — 1,241.79 1,241.79 0.04973 0.05302 1.24269 1,260.07 HighTurnover(SitDownRestaurant)
0.14706 0.13554 0.11240 1.01936 0.00282 0.00172 0.29561 0.29734 0.00161 0.07498 0.07660 — 260.523 260.523 0.01043 0.01112 0.26071 264.360 Total 2.41298 2.22040 1.87674 17.0276 0.04741 0.02893 4.97690 5.00583 0.02710 1.26236 1.28947 — 4,382.75 4,382.75 0.17299 0.18590 4.38931 4,446.86 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 54 / 112
4.1.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel 2.11525 1.95455 1.45599 14.9871 0.04114 0.02441 4.25050 4.27491 0.02287 1.07789 1.10076 — 4,190.77 4,190.77 0.15589 0.16532 9.43088 4,253.37ApartmentsHighRise
2.33245 2.14377 1.69779 17.5940 0.04914 0.02898 5.08837 5.11734 0.02715 1.29037 1.31751 — 5,005.42 5,005.42 0.17853 0.19347 11.2899 5,078.83 Supermarket
0.96122 0.88819 0.66163 6.81045 0.01869 0.01109 1.93152 1.94261 0.01039 0.48982 0.50021 — 1,904.38 1,904.38 0.07084 0.07513 4.28559 1,932.82 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 FastFoodRestaurantw/o DriveThru
2.61210 2.41365 1.79798 18.5074 0.05080 0.03015 5.24889 5.27904 0.02824 1.33108 1.35932 — 5,175.13 5,175.13 0.19251 0.20415 11.6461 5,252.43 HighTurnover(SitDownRestaurant)
0.54801 0.50638 0.37721 3.88280 0.01066 0.00633 1.10120 1.10753 0.00593 0.27926 0.28518 — 1,085.73 1,085.73 0.04039 0.04283 2.44331 1,101.94 Total 8.56904 7.90654 5.99059 61.7817 0.17043 0.10096 17.6205 17.7214 0.09458 4.46841 4.56299 — 17,361.4 17,361.4 0.63816 0.68090 39.0958 17,619.4Daily,Winter(Max) ——————————————————
Hotel 2.10225 1.93718 1.62592 14.6459 0.03971 0.02443 4.25050 4.27493 0.02288 1.07789 1.10077 — 4,046.74 4,046.74 0.16751 0.17648 0.24454 4,103.76 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 55 / 112
4,899.32 0.29274 0.20637 0.19075 4,832.76 4,832.76
— 1.31753 1.29037 0.02716 5.11735 5.08837 0.02899 0.04743 17.0706 1.89540 2.12581 2.31888 Apartme nts
Supermarket
0.95531 0.88030 0.73885 6.65541 0.01805 0.01110 1.93152 1.94262 0.01040 0.48982 0.50021 — 1,838.92 1,838.92 0.07612 0.08020 0.11112 1,864.84 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 FastFoodRestaurantw/o DriveThru
2.59604 2.39220 2.00783 18.0861 0.04904 0.03016 5.24889 5.27905 0.02826 1.33108 1.35933 — 4,997.27 4,997.27 0.20686 0.21794 0.30197 5,067.68 HighTurnover(SitDownRestaurant)
0.54464 0.50188 0.42124 3.79440 0.01029 0.00633 1.10120 1.10753 0.00593 0.27926 0.28518 — 1,048.41 1,048.41 0.04340 0.04572 0.06335 1,063.19 Total 8.51712 7.83736 6.68925 60.2523 0.16452 0.10101 17.6205 17.7215 0.09462 4.46841 4.56303 — 16,764.1 16,764.1 0.68463 0.72671 1.01373 16,998.8Annual — — — — — — — — — — — — — — — — — —Hotel 0.38029 0.35051 0.29067 2.63605 0.00729 0.00446 0.76445 0.76891 0.00417 0.19390 0.19807 — 673.708 673.708 0.02698 0.02876 0.67420 683.628ApartmentsHighRise
0.41957 0.38467 0.33909 3.07947 0.00870 0.00529 0.91514 0.92043 0.00496 0.23212 0.23708 — 804.592 804.592 0.03079 0.03366 0.80710 816.199 Supermarket
0.17281 0.15928 0.13209 1.19788 0.00331 0.00203 0.34738 0.34941 0.00190 0.08811 0.09001 — 306.147 306.147 0.01226 0.01307 0.30637 310.655 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 56 / 112
844.205 0.83256 0.03552 0.03332 831.954 831.954
— 0.24460 0.23944 0.00516 0.94951 0.94401 0.00550 0.00900 3.25523 0.35894 0.43284 0.46962 Fast FoodRestaurantw/oDriveThru
HighTurnover(SitDownRestaurant)
0.09853 0.09081 0.07531 0.68294 0.00189 0.00115 0.19805 0.19921 0.00108 0.05023 0.05132 — 174.541 174.541 0.00699 0.00745 0.17467 177.112 Total 1.54082 1.41810 1.19610 10.8516 0.03019 0.01843 3.16903 3.18746 0.01726 0.80381 0.82107 — 2,790.94 2,790.94 0.11034 0.11847 2.79489 2,831.80
4.2. Energy4.2.1. Electricity Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — — 2,060.22 2,060.22 0.26070 0.03160 — 2,076.15ApartmentsHighRise — — — — — — — — — — — — 583.304 583.304 0.07381 0.00895 — 587.815 Supermarket
— — — — — — — — — — — — 327.415 327.415 0.04143 0.00502 — 329.947 EnclosedParkingStructure
— — — — — — — — — — — — 77.0533 77.0533 0.00975 0.00118 — 77.6492 ParkingLot
— — — — — — — — — — — — 49.0749 49.0749 0.00621 0.00075 — 49.4544 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 57 / 112
234.639
— 0.00357 0.02946 232.838 232.838
—
—
—
—
—
—
—
—
—
—
—
— Fast
FoodRestaurantw/o DriveThru
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 106.347 106.347 0.01346 0.00163 — 107.169 Total — — — — — — — — — — — — 3,436.25 3,436.25 0.43482 0.05271 — 3,462.82Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — — 2,060.22 2,060.22 0.26070 0.03160 — 2,076.15ApartmentsHighRise — — — — — — — — — — — — 583.304 583.304 0.07381 0.00895 — 587.815 Supermarket
— — — — — — — — — — — — 327.415 327.415 0.04143 0.00502 — 329.947 EnclosedParkingStructure
— — — — — — — — — — — — 77.0533 77.0533 0.00975 0.00118 — 77.6492 ParkingLot
— — — — — — — — — — — — 49.0749 49.0749 0.00621 0.00075 — 49.4544 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — 232.838 232.838 0.02946 0.00357 — 234.639 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 106.347 106.347 0.01346 0.00163 — 107.169 Total — — — — — — — — — — — — 3,436.25 3,436.25 0.43482 0.05271 — 3,462.82 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 58 / 112
Annual — — — — — — — — — — — — — — — — — —
Hotel — — — — — — — — — — — — 341.092 341.092 0.04316 0.00523 — 343.730ApartmentsHighRise — — — — — — — — — — — — 96.5726 96.5726 0.01222 0.00148 — 97.3195 Supermarket
— — — — — — — — — — — — 54.2072 54.2072 0.00686 0.00083 — 54.6265 EnclosedParkingStructure
— — — — — — — — — — — — 12.7571 12.7571 0.00161 0.00020 — 12.8557 ParkingLot
— — — — — — — — — — — — 8.12491 8.12491 0.00103 0.00012 — 8.18775 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — 38.5490 38.5490 0.00488 0.00059 — 38.8471 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 17.6069 17.6069 0.00223 0.00027 — 17.7431 Total — — — — — — — — — — — — 568.910 568.910 0.07199 0.00873 — 573.310
4.2.2. Electricity Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — — 1,961.21 1,961.21 0.24817 0.03008 — 1,976.38 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 59 / 112
555.091
— 0.00845 0.06970 550.830 550.830
—
—
—
—
—
—
—
—
—
—
—
— Apartme
ntsHighRise
Supermarket
— — — — — — — — — — — — 215.980 215.980 0.02733 0.00331 — 217.650 EnclosedParkingStructure
— — — — — — — — — — — — 77.6703 77.6703 0.00983 0.00119 — 78.2710 ParkingLot
— — — — — — — — — — — — 49.0749 49.0749 0.00621 0.00075 — 49.4544 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — 199.753 199.753 0.02528 0.00306 — 201.298 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 91.2355 91.2355 0.01154 0.00140 — 91.9411 Total — — — — — — — — — — — — 3,145.75 3,145.75 0.39806 0.04825 — 3,170.08Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — — 1,957.08 1,957.08 0.24765 0.03002 — 1,972.21ApartmentsHighRise — — — — — — — — — — — — 546.151 546.151 0.06911 0.00838 — 550.375 Supermarket
— — — — — — — — — — — — 215.697 215.697 0.02729 0.00331 — 217.365 EnclosedParkingStructure
— — — — — — — — — — — — 77.0533 77.0533 0.00975 0.00118 — 77.6492 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 60 / 112
49.4544
— 0.00075 0.00621 49.0749 49.0749
—
—
—
—
—
—
—
—
—
—
—
— Parking
Lot
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — 199.562 199.562 0.02525 0.00306 — 201.106 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 91.1483 91.1483 0.01153 0.00140 — 91.8533 Total — — — — — — — — — — — — 3,135.76 3,135.76 0.39680 0.04810 — 3,160.02Annual — — — — — — — — — — — — — — — — — —Hotel — — — — — — — — — — — — 324.354 324.354 0.04104 0.00497 — 326.862ApartmentsHighRise — — — — — — — — — — — — 90.8036 90.8036 0.01149 0.00139 — 91.5059 Supermarket
— — — — — — — — — — — — 35.7342 35.7342 0.00452 0.00055 — 36.0105 EnclosedParkingStructure
— — — — — — — — — — — — 12.8074 12.8074 0.00162 0.00020 — 12.9065 ParkingLot
— — — — — — — — — — — — 8.12491 8.12491 0.00103 0.00012 — 8.18775 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — 33.0554 33.0554 0.00418 0.00051 — 33.3111 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 15.0978 15.0978 0.00191 0.00023 — 15.2145 Total — — — — — — — — — — — — 519.977 519.977 0.06580 0.00798 — 523.998 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 61 / 112
4.2.3. Natural Gas Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel 0.17821 0.08911 1.62013 1.36091 0.00972 0.12313 — 0.12313 0.12313 — 0.12313 — 1,933.08 1,933.08 0.17108 0.00364 — 1,938.45ApartmentsHighRise
0.09711 0.04856 0.82988 0.35314 0.00530 0.06710 — 0.06710 0.06710 — 0.06710 — 1,053.38 1,053.38 0.09322 0.00198 — 1,056.31 Supermarket
0.00694 0.00347 0.06311 0.05302 0.00038 0.00480 — 0.00480 0.00480 — 0.00480 — 75.3052 75.3052 0.00666 0.00014 — 75.5140 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
0.03235 0.01617 0.29408 0.24703 0.00176 0.02235 — 0.02235 0.02235 — 0.02235 — 350.888 350.888 0.03105 0.00066 — 351.862 HighTurnover(SitDownRestaurant)
0.01478 0.00739 0.13432 0.11283 0.00081 0.01021 — 0.01021 0.01021 — 0.01021 — 160.265 160.265 0.01418 0.00030 — 160.710 Total 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 3,572.93 3,572.93 0.31620 0.00673 — 3,582.84Daily,Winter(Max) ——————————————————
Hotel 0.17821 0.08911 1.62013 1.36091 0.00972 0.12313 — 0.12313 0.12313 — 0.12313 — 1,933.08 1,933.08 0.17108 0.00364 — 1,938.45 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 62 / 112
1,056.31
— 0.00198 0.09322 1,053.38 1,053.38
— 0.06710
— 0.06710 0.06710
— 0.06710 0.00530 0.35314 0.82988 0.04856 0.09711 Apartme nts
Supermarket
0.00694 0.00347 0.06311 0.05302 0.00038 0.00480 — 0.00480 0.00480 — 0.00480 — 75.3052 75.3052 0.00666 0.00014 — 75.5140 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
0.03235 0.01617 0.29408 0.24703 0.00176 0.02235 — 0.02235 0.02235 — 0.02235 — 350.888 350.888 0.03105 0.00066 — 351.862 HighTurnover(SitDownRestaurant)
0.01478 0.00739 0.13432 0.11283 0.00081 0.01021 — 0.01021 0.01021 — 0.01021 — 160.265 160.265 0.01418 0.00030 — 160.710 Total 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 3,572.93 3,572.93 0.31620 0.00673 — 3,582.84Annual — — — — — — — — — — — — — — — — — —Hotel 0.03252 0.01626 0.29567 0.24837 0.00177 0.02247 — 0.02247 0.02247 — 0.02247 — 320.044 320.044 0.02832 0.00060 — 320.932ApartmentsHighRise
0.01772 0.00886 0.15145 0.06445 0.00097 0.01225 — 0.01225 0.01225 — 0.01225 — 174.400 174.400 0.01543 0.00033 — 174.883 Supermarket
0.00127 0.00063 0.01152 0.00968 0.00007 0.00088 — 0.00088 0.00088 — 0.00088 — 12.4676 12.4676 0.00110 0.00002 — 12.5022 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 63 / 112
58.2547
— 0.00011 0.00514 58.0936 58.0936
— 0.00408
— 0.00408 0.00408
— 0.00408 0.00032 0.04508 0.05367 0.00295 0.00590 Fast
FoodRestaurantw/oDriveThru
HighTurnover(SitDownRestaurant)
0.00270 0.00135 0.02451 0.02059 0.00015 0.00186 — 0.00186 0.00186 — 0.00186 — 26.5337 26.5337 0.00235 0.00005 — 26.6073 Total 0.06011 0.03006 0.53683 0.38816 0.00328 0.04153 — 0.04153 0.04153 — 0.04153 — 591.539 591.539 0.05235 0.00111 — 593.180
4.2.4. Natural Gas Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel 0.17821 0.08911 1.62013 1.36091 0.00972 0.12313 — 0.12313 0.12313 — 0.12313 — 1,933.08 1,933.08 0.17108 0.00364 — 1,938.45ApartmentsHighRise
0.09711 0.04856 0.82988 0.35314 0.00530 0.06710 — 0.06710 0.06710 — 0.06710 — 1,053.38 1,053.38 0.09322 0.00198 — 1,056.31 Supermarket
0.00694 0.00347 0.06311 0.05302 0.00038 0.00480 — 0.00480 0.00480 — 0.00480 — 75.3052 75.3052 0.00666 0.00014 — 75.5140 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 64 / 112
351.862
— 0.00066 0.03105 350.888 350.888
— 0.02235
— 0.02235 0.02235
— 0.02235 0.00176 0.24703 0.29408 0.01617 0.03235 Fast
FoodRestaurantw/o DriveThru
HighTurnover(SitDownRestaurant)
0.01478 0.00739 0.13432 0.11283 0.00081 0.01021 — 0.01021 0.01021 — 0.01021 — 160.265 160.265 0.01418 0.00030 — 160.710 Total 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 3,572.93 3,572.93 0.31620 0.00673 — 3,582.84Daily,Winter(Max) ——————————————————
Hotel 0.17821 0.08911 1.62013 1.36091 0.00972 0.12313 — 0.12313 0.12313 — 0.12313 — 1,933.08 1,933.08 0.17108 0.00364 — 1,938.45ApartmentsHighRise
0.09711 0.04856 0.82988 0.35314 0.00530 0.06710 — 0.06710 0.06710 — 0.06710 — 1,053.38 1,053.38 0.09322 0.00198 — 1,056.31 Supermarket
0.00694 0.00347 0.06311 0.05302 0.00038 0.00480 — 0.00480 0.00480 — 0.00480 — 75.3052 75.3052 0.00666 0.00014 — 75.5140 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
0.03235 0.01617 0.29408 0.24703 0.00176 0.02235 — 0.02235 0.02235 — 0.02235 — 350.888 350.888 0.03105 0.00066 — 351.862 HighTurnover(SitDownRestaurant)
0.01478 0.00739 0.13432 0.11283 0.00081 0.01021 — 0.01021 0.01021 — 0.01021 — 160.265 160.265 0.01418 0.00030 — 160.710 Total 0.32939 0.16470 2.94152 2.12692 0.01797 0.22758 — 0.22758 0.22758 — 0.22758 — 3,572.93 3,572.93 0.31620 0.00673 — 3,582.84 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 65 / 112
Annual — — — — — — — — — — — — — — — — — —
Hotel 0.03252 0.01626 0.29567 0.24837 0.00177 0.02247 — 0.02247 0.02247 — 0.02247 — 320.044 320.044 0.02832 0.00060 — 320.932ApartmentsHighRise
0.01772 0.00886 0.15145 0.06445 0.00097 0.01225 — 0.01225 0.01225 — 0.01225 — 174.400 174.400 0.01543 0.00033 — 174.883 Supermarket
0.00127 0.00063 0.01152 0.00968 0.00007 0.00088 — 0.00088 0.00088 — 0.00088 — 12.4676 12.4676 0.00110 0.00002 — 12.5022 EnclosedParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
0.00590 0.00295 0.05367 0.04508 0.00032 0.00408 — 0.00408 0.00408 — 0.00408 — 58.0936 58.0936 0.00514 0.00011 — 58.2547 HighTurnover(SitDownRestaurant)
0.00270 0.00135 0.02451 0.02059 0.00015 0.00186 — 0.00186 0.00186 — 0.00186 — 26.5337 26.5337 0.00235 0.00005 — 26.6073 Total 0.06011 0.03006 0.53683 0.38816 0.00328 0.04153 — 0.04153 0.04153 — 0.04153 — 591.539 591.539 0.05235 0.00111 — 593.180
4.3. Area Emissions by Source4.3.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 66 / 112
ConsumProducts
9.95060 9.95060 ————————————————
ArchitecturalCoatings
0.70179 0.70179 ————————————————
LandscapeEquipment
3.29506 3.07064 0.22363 25.1948 0.00128 0.02663 — 0.02663 0.02014 — 0.02014 — 83.7961 83.7961 0.00351 0.00071 — 84.0950 Total 13.9474 13.7230 0.22363 25.1948 0.00128 0.02663 — 0.02663 0.02014 — 0.02014 0.00000 83.7961 83.7961 0.00351 0.00071 — 84.0950Daily,Winter(Max) ——————————————————
Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000ConsumerProducts
9.95060 9.95060 ————————————————
ArchitecturalCoatings
0.70179 0.70179 ————————————————
Total 10.6524 10.6524 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Annual — — — — — — — — — — — — — — — — — —Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000ConsumerProducts
1.81598 1.81598 ————————————————
ArchitecturalCoatings
0.12808 0.12808 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 67 / 112
6.86608
— 0.00006 0.00029 6.84168 6.84168
— 0.00181
— 0.00181 0.00240
— 0.00240 0.00012 2.26753 0.02013 0.27636 0.29656 Landsca peEquipment
Total 2.24062 2.22042 0.02013 2.26753 0.00012 0.00240 — 0.00240 0.00181 — 0.00181 0.00000 6.84168 6.84168 0.00029 0.00006 — 6.86608
4.3.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000ConsumerProducts
9.95060 9.95060 ————————————————
ArchitecturalCoatings
0.13953 0.13953 ————————————————
Total 10.0901 10.0901 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000Daily,Winter(Max) ——————————————————
Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000ConsumerProducts
9.95060 9.95060 ————————————————
ArchitecturalCoatings
0.13953 0.13953 ————————————————
Total 10.0901 10.0901 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 68 / 112
Annual — — — — — — — — — — — — — — — — — —
Hearths 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000ConsumerProducts
1.81598 1.81598 ————————————————
ArchitecturalCoatings
0.02546 0.02546 ————————————————
Total 1.84145 1.84145 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000
4.4. Water Emissions by Land Use4.4.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — 6.90244 17.5686 24.4711 0.70999 0.01709 — 47.3124ApartmentsHighRise — — — — — — — — — — — 17.4317 44.3046 61.7362 1.79302 0.04315 — 119.420 Supermarket
— — — — — — — — — — — 3.33624 8.51700 11.8532 0.34317 0.00826 — 22.8936 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
ParkingLot
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 69 / 112
37.9804
— 0.01371 0.56980 19.6490 14.1094 5.53956
—
—
—
—
—
—
—
—
—
—
— Fast
FoodRestaurantw/o DriveThru
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 2.53014 6.47098 9.00112 0.26026 0.00626 — 17.3740 Total — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — 6.90244 17.5686 24.4711 0.70999 0.01709 — 47.3124ApartmentsHighRise — — — — — — — — — — — 17.4317 44.3046 61.7362 1.79302 0.04315 — 119.420 Supermarket
— — — — — — — — — — — 3.33624 8.51700 11.8532 0.34317 0.00826 — 22.8936 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
ParkingLot
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 5.53956 14.1094 19.6490 0.56980 0.01371 — 37.9804 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 2.53014 6.47098 9.00112 0.26026 0.00626 — 17.3740 Total — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 70 / 112
Annual — — — — — — — — — — — — — — — — — —
Hotel — — — — — — — — — — — 1.14278 2.90869 4.05147 0.11755 0.00283 — 7.83310ApartmentsHighRise — — — — — — — — — — — 2.88601 7.33513 10.2211 0.29686 0.00714 — 19.7713 Supermarket
— — — — — — — — — — — 0.55235 1.41009 1.96244 0.05682 0.00137 — 3.79030 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00812 0.00812 <
0.000005
<0.000005
— 0.00818
ParkingLot
— — — — — — — — — — — 0.00000 0.00812 0.00812 <
0.000005
<0.000005
— 0.00818
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 0.91714 2.33598 3.25311 0.09434 0.00227 — 6.28808 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 0.41889 1.07134 1.49024 0.04309 0.00104 — 2.87647 Total — — — — — — — — — — — 5.91717 15.0775 20.9946 0.60865 0.01465 — 40.5756
4.4.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — 6.90244 17.5686 24.4711 0.70999 0.01709 — 47.3124 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 71 / 112
119.420
— 0.04315 1.79302 61.7362 44.3046 17.4317
—
—
—
—
—
—
—
—
—
—
— Apartme
ntsHighRise
Supermarket
— — — — — — — — — — — 3.33624 8.51700 11.8532 0.34317 0.00826 — 22.8936 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
ParkingLot
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 5.53956 14.1094 19.6490 0.56980 0.01371 — 37.9804 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 2.53014 6.47098 9.00112 0.26026 0.00626 — 17.3740 Total — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — 6.90244 17.5686 24.4711 0.70999 0.01709 — 47.3124ApartmentsHighRise — — — — — — — — — — — 17.4317 44.3046 61.7362 1.79302 0.04315 — 119.420 Supermarket
— — — — — — — — — — — 3.33624 8.51700 11.8532 0.34317 0.00826 — 22.8936 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.04902 0.04902 0.00001 <
0.000005
— 0.04940
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 72 / 112
0.04940
— 0.00001 0.04902 0.04902 0.00000
—
—
—
—
—
—
—
—
—
—
— Parking
Lot
<0.000005
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 5.53956 14.1094 19.6490 0.56980 0.01371 — 37.9804 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 2.53014 6.47098 9.00112 0.26026 0.00626 — 17.3740 Total — — — — — — — — — — — 35.7400 91.0687 126.809 3.67626 0.08847 — 245.079Annual — — — — — — — — — — — — — — — — — —Hotel — — — — — — — — — — — 1.14278 2.90869 4.05147 0.11755 0.00283 — 7.83310ApartmentsHighRise — — — — — — — — — — — 2.88601 7.33513 10.2211 0.29686 0.00714 — 19.7713 Supermarket
— — — — — — — — — — — 0.55235 1.41009 1.96244 0.05682 0.00137 — 3.79030 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00812 0.00812 <
0.000005
<0.000005
— 0.00818
ParkingLot
— — — — — — — — — — — 0.00000 0.00812 0.00812 <
0.000005
<0.000005
— 0.00818
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 0.91714 2.33598 3.25311 0.09434 0.00227 — 6.28808 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 0.41889 1.07134 1.49024 0.04309 0.00104 — 2.87647 Total — — — — — — — — — — — 5.91717 15.0775 20.9946 0.60865 0.01465 — 40.5756 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 73 / 112
4.5. Waste Emissions by Land Use4.5.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — 41.8998 0.00000 41.8998 4.18773 0.00000 — 146.593ApartmentsHighRise — — — — — — — — — — — 95.5943 0.00000 95.5943 9.55430 0.00000 — 334.452 Supermarket
— — — — — — — — — — — 42.9315 0.00000 42.9315 4.29085 0.00000 — 150.203 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 59.1249 0.00000 59.1249 5.90932 0.00000 — 206.858 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 27.8982 0.00000 27.8982 2.78832 0.00000 — 97.6062 Total — — — — — — — — — — — 267.449 0.00000 267.449 26.7305 0.00000 — 935.712Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 74 / 112
Hotel — — — — — — — — — — — 41.8998 0.00000 41.8998 4.18773 0.00000 — 146.593 ApartmentsHighRise
— — — — — — — — — — — 95.5943 0.00000 95.5943 9.55430 0.00000 — 334.452 Supermarket
— — — — — — — — — — — 42.9315 0.00000 42.9315 4.29085 0.00000 — 150.203 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 59.1249 0.00000 59.1249 5.90932 0.00000 — 206.858 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 27.8982 0.00000 27.8982 2.78832 0.00000 — 97.6062 Total — — — — — — — — — — — 267.449 0.00000 267.449 26.7305 0.00000 — 935.712Annual — — — — — — — — — — — — — — — — — —Hotel — — — — — — — — — — — 6.93699 0.00000 6.93699 0.69333 0.00000 — 24.2702ApartmentsHighRise — — — — — — — — — — — 15.8267 0.00000 15.8267 1.58182 0.00000 — 55.3723 Supermarket
— — — — — — — — — — — 7.10780 0.00000 7.10780 0.71040 0.00000 — 24.8678 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 75 / 112
0.00000
— 0.00000 0.00000 0.00000 0.00000 0.00000
—
—
—
—
—
—
—
—
—
—
— Parking
Lot
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 9.78881 0.00000 9.78881 0.97836 0.00000 — 34.2477 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 4.61886 0.00000 4.61886 0.46164 0.00000 — 16.1598 Total — — — — — — — — — — — 44.2792 0.00000 44.2792 4.42554 0.00000 — 154.918
4.5.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — 10.4749 0.00000 10.4749 1.04693 0.00000 — 36.6483ApartmentsHighRise — — — — — — — — — — — 23.8986 0.00000 23.8986 2.38858 0.00000 — 83.6130 Supermarket
— — — — — — — — — — — 10.7329 0.00000 10.7329 1.07271 0.00000 — 37.5507 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 76 / 112
51.7145
— 0.00000 1.47733 14.7812 0.00000 14.7812
—
—
—
—
—
—
—
—
—
—
— Fast
FoodRestaurantw/oDriveThru
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 6.97454 0.00000 6.97454 0.69708 0.00000 — 24.4016 Total — — — — — — — — — — — 66.8622 0.00000 66.8622 6.68263 0.00000 — 233.928Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — 10.4749 0.00000 10.4749 1.04693 0.00000 — 36.6483ApartmentsHighRise — — — — — — — — — — — 23.8986 0.00000 23.8986 2.38858 0.00000 — 83.6130 Supermarket
— — — — — — — — — — — 10.7329 0.00000 10.7329 1.07271 0.00000 — 37.5507 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 14.7812 0.00000 14.7812 1.47733 0.00000 — 51.7145 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 6.97454 0.00000 6.97454 0.69708 0.00000 — 24.4016 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 77 / 112
Total — — — — — — — — — — — 66.8622 0.00000 66.8622 6.68263 0.00000 — 233.928 Annual — — — — — — — — — — — — — — — — — —Hotel — — — — — — — — — — — 1.73425 0.00000 1.73425 0.17333 0.00000 — 6.06754ApartmentsHighRise — — — — — — — — — — — 3.95668 0.00000 3.95668 0.39546 0.00000 — 13.8431 Supermarket
— — — — — — — — — — — 1.77695 0.00000 1.77695 0.17760 0.00000 — 6.21695 EnclosedParkingStructure
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ParkingLot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — 2.44720 0.00000 2.44720 0.24459 0.00000 — 8.56193 HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 1.15471 0.00000 1.15471 0.11541 0.00000 — 4.03996 Total — — — — — — — — — — — 11.0698 0.00000 11.0698 1.10639 0.00000 — 38.7294
4.6. Refrigerant Emissions by Land Use4.6.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 78 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Hotel — — — — — — — — — — — — — — — — 322.318 322.318ApartmentsHighRise — — — — — — — — — — — — — — — — 1.65013 1.65013
Supermarket
— — — — — — — — — — — — — — — — 2,928.18 2,928.18
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 14.8884 14.8884
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 6.80016 6.80016
Total — — — — — — — — — — — — — — — — 3,273.83 3,273.83Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — — — — — — 322.318 322.318ApartmentsHighRise — — — — — — — — — — — — — — — — 1.65013 1.65013
Supermarket
— — — — — — — — — — — — — — — — 2,928.18 2,928.18
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 14.8884 14.8884
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 79 / 112
6.80016 6.80016
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— High
Turnover(SitDownRestaurant)
Total — — — — — — — — — — — — — — — — 3,273.83 3,273.83Annual — — — — — — — — — — — — — — — — — —Hotel — — — — — — — — — — — — — — — — 53.3634 53.3634ApartmentsHighRise — — — — — — — — — — — — — — — — 0.27320 0.27320
Supermarket
— — — — — — — — — — — — — — — — 484.793 484.793
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 2.46495 2.46495
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 1.12584 1.12584
Total — — — — — — — — — — — — — — — — 542.021 542.021
4.6.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Hotel — — — — — — — — — — — — — — — — 322.318 322.318
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 80 / 112
1.65013 1.65013
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Apartme
ntsHighRise
Supermarket
— — — — — — — — — — — — — — — — 2,928.18 2,928.18
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 14.8884 14.8884
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 6.80016 6.80016
Total — — — — — — — — — — — — — — — — 3,273.83 3,273.83Daily,Winter(Max) ——————————————————
Hotel — — — — — — — — — — — — — — — — 322.318 322.318ApartmentsHighRise — — — — — — — — — — — — — — — — 1.65013 1.65013
Supermarket
— — — — — — — — — — — — — — — — 2,928.18 2,928.18
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 14.8884 14.8884
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 6.80016 6.80016
Total — — — — — — — — — — — — — — — — 3,273.83 3,273.83 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 81 / 112
Annual — — — — — — — — — — — — — — — — — —
Hotel — — — — — — — — — — — — — — — — 53.3634 53.3634ApartmentsHighRise — — — — — — — — — — — — — — — — 0.27320 0.27320
Supermarket
— — — — — — — — — — — — — — — — 484.793 484.793
FastFoodRestaurantw/o DriveThru
— — — — — — — — — — — — — — — — 2.46495 2.46495
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 1.12584 1.12584
Total — — — — — — — — — — — — — — — — 542.021 542.021
4.7. Offroad Emissions By Equipment Type4.7.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 82 / 112
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.7.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type4.8.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 83 / 112
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type4.9.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 84 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Winter(Max)
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type4.10.1. Soil Carbon Accumulation By Vegetation Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 85 / 112
Total — — — — — — — — — — — — — — — — — —
Daily,Winter(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — — Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 86 / 112
Sequest ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 87 / 112
Vegetati TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.6. Avoided and Sequestered Emissions by Species - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 88 / 112
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 89 / 112
Subtotal — — — — — — — — — — — — — — — — — —
———————————————————
5. Activity Data5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase DescriptionGrading Grading 10/1/2028 1/31/2029 5.00000 88.0000 —Building Construction Building Construction 2/1/2029 9/30/2031 5.00000 694.000 —Paving Paving 7/1/2031 10/31/2031 5.00000 89.0000 —Architectural Coating Architectural Coating 3/1/2031 12/31/2031 5.00000 218.000 —
5.2. Off-Road Equipment5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorGrading Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000Grading Graders Diesel Tier 4 Final 1.000000 8.00000 148.000 0.41000Grading Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Grading Scrapers Diesel Tier 4 Final 2.00000 8.00000 423.000 0.48000Grading Tractors/Loaders/Back hoes
Diesel Tier 4 Final 2.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 7.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 3.00000 8.00000 82.0000 0.20000Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000Building Construction Tractors/Loaders/Back hoes
Diesel Tier 4 Final 3.00000 7.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 90 / 112
Paving Pavers Diesel Tier 4 Final 2.00000 8.00000 81.0000 0.42000 Paving Paving Equipment Diesel Tier 4 Final 2.00000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorGrading Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000Grading Graders Diesel Tier 4 Final 1.000000 8.00000 148.000 0.41000Grading Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Grading Scrapers Diesel Tier 4 Final 2.00000 8.00000 423.000 0.48000Grading Tractors/Loaders/Back hoes
Diesel Tier 4 Final 2.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 7.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 3.00000 8.00000 82.0000 0.20000Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000Building Construction Tractors/Loaders/Back hoes
Diesel Tier 4 Final 3.00000 7.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000Paving Pavers Diesel Tier 4 Final 2.00000 8.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 2.00000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.3. Construction Vehicles5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixGrading Worker 20.0000 18.5000 LDA,LDT1,LDT2 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 91 / 112
Grading Vendor — 10.2000 HHDT,MHDT
Grading Hauling 70.3182 9.00000 HHDTGrading Onsite truck — — HHDTBuilding Construction Worker 282.680 18.5000 LDA,LDT1,LDT2Building Construction Vendor 69.0865 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 15.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 56.5360 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixGrading Worker 20.0000 18.5000 LDA,LDT1,LDT2Grading Vendor — 10.2000 HHDT,MHDTGrading Hauling 70.3182 9.00000 HHDTGrading Onsite truck — — HHDTBuilding Construction Worker 282.680 18.5000 LDA,LDT1,LDT2Building Construction Vendor 69.0865 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 15.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDT Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 92 / 112
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDTArchitectural Coating Worker 56.5360 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.4. Vehicles5.4.1. Construction Vehicle Control StrategiesNon-applicable. No control strategies activated by user.5.5. Architectural Coatings Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior AreaCoated (sq ft)
Non-Residential Interior AreaCoated (sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 466,560 155,520 352,631 117,242 6,515.70
5.6. Dust Mitigation5.6.1. Construction Earthmoving Activities Phase Name Material Imported (Cubic
Yards)
Material Exported (CubicYards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Grading — 49,500.0 264.000 0.00000 0.00000Paving 0.00000 0.00000 0.00000 0.00000 2.49300
5.6.2. Construction Earthmoving Control StrategiesNon-applicable. No control strategies activated by user.5.7. Construction Paving Phase Name Land Use Area Paved (acres) % Asphalt
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 93 / 112
Paving Hotel 0.00000 0%
Paving Apartments High Rise — 0%Paving Supermarket 0.00000 0%Paving Enclosed Parking Structure 0.69300 100%Paving Parking Lot 1.80000 100%Paving Fast Food Restaurant w/o Drive Thru 0.00000 0%Paving High Turnover (Sit Down Restaurant) 0.00000 0%
5.8. Construction Electricity Consumption and Emissions FactorskWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O2028 0.00000 531.983 0.03300 0.004002029 0.00000 531.983 0.03300 0.004002030 0.00000 531.983 0.03300 0.004002031 0.00000 531.983 0.03300 0.00400
5.9. Operational Mobile Sources5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearHotel 829.280 829.280 829.280 302,687 8,986.07 8,986.07 8,986.07 3,279,916Apartments HighRise 1,043.52 1,043.52 1,043.52 380,885 12,700.7 12,700.7 12,700.7 4,635,753 Supermarket 376.842 376.842 376.842 137,547 4,083.46 4,083.46 4,083.46 1,490,463Enclosed ParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Parking Lot 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 94 / 112
4,050,329 11,096.8 11,096.8 11,096.8 373,785 1,024.07 1,024.07 1,024.07 Fast Food Restaurant w/oDrive Thru
High Turnover (SitDown Restaurant)
214.846 214.846 214.846 78,419.0 2,328.07 2,328.07 2,328.07 849,747
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearHotel 555.588 555.588 555.588 202,790 6,020.35 6,020.35 6,020.35 2,197,428Apartments HighRise 592.153 592.153 592.153 216,136 7,207.09 7,207.09 7,207.09 2,630,590 Supermarket 252.471 252.471 252.471 92,152.0 2,735.78 2,735.78 2,735.78 998,558Enclosed ParkingStructure
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Parking Lot 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Fast FoodRestaurant w/oDrive Thru 686.090 686.090 686.090 250,423 7,434.46 7,434.46 7,434.46 2,713,578 High Turnover (SitDown Restaurant)
143.940 143.940 143.940 52,538.0 1,559.73 1,559.73 1,559.73 569,301
5.10. Operational Area Sources5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number)Hotel Wood Fireplaces 0 0Hotel Gas Fireplaces 0 0Hotel Propane Fireplaces 0 0Hotel Electric Fireplaces 0 0Hotel No Fireplaces 0 0Hotel Conventional Wood Stoves 0 0 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 95 / 112
Hotel Catalytic Wood Stoves 0 0
Hotel Non-Catalytic Wood Stoves 0 0Hotel Pellet Wood Stoves 0 0Apartments High Rise Wood Fireplaces 0 0Apartments High Rise Gas Fireplaces 0 0Apartments High Rise Propane Fireplaces 0 0Apartments High Rise Electric Fireplaces 0 0Apartments High Rise No Fireplaces 240 240Apartments High Rise Conventional Wood Stoves 0 0Apartments High Rise Catalytic Wood Stoves 0 0Apartments High Rise Non-Catalytic Wood Stoves 0 0Apartments High Rise Pellet Wood Stoves 0 0Supermarket Wood Fireplaces 0 0Supermarket Gas Fireplaces 0 0Supermarket Propane Fireplaces 0 0Supermarket Electric Fireplaces 0 0Supermarket No Fireplaces 0 0Supermarket Conventional Wood Stoves 0 0Supermarket Catalytic Wood Stoves 0 0Supermarket Non-Catalytic Wood Stoves 0 0Supermarket Pellet Wood Stoves 0 0Enclosed Parking Structure Wood Fireplaces 0 0Enclosed Parking Structure Gas Fireplaces 0 0Enclosed Parking Structure Propane Fireplaces 0 0Enclosed Parking Structure Electric Fireplaces 0 0Enclosed Parking Structure No Fireplaces 0 0Enclosed Parking Structure Conventional Wood Stoves 0 0Enclosed Parking Structure Catalytic Wood Stoves 0 0 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 96 / 112
Enclosed Parking Structure Non-Catalytic Wood Stoves 0 0 Enclosed Parking Structure Pellet Wood Stoves 0 0Parking Lot Wood Fireplaces 0 0Parking Lot Gas Fireplaces 0 0Parking Lot Propane Fireplaces 0 0Parking Lot Electric Fireplaces 0 0Parking Lot No Fireplaces 0 0Parking Lot Conventional Wood Stoves 0 0Parking Lot Catalytic Wood Stoves 0 0Parking Lot Non-Catalytic Wood Stoves 0 0Parking Lot Pellet Wood Stoves 0 0Fast Food Restaurant w/o Drive Thru Wood Fireplaces 0 0Fast Food Restaurant w/o Drive Thru Gas Fireplaces 0 0Fast Food Restaurant w/o Drive Thru Propane Fireplaces 0 0Fast Food Restaurant w/o Drive Thru Electric Fireplaces 0 0Fast Food Restaurant w/o Drive Thru No Fireplaces 0 0Fast Food Restaurant w/o Drive Thru Conventional Wood Stoves 0 0Fast Food Restaurant w/o Drive Thru Catalytic Wood Stoves 0 0Fast Food Restaurant w/o Drive Thru Non-Catalytic Wood Stoves 0 0Fast Food Restaurant w/o Drive Thru Pellet Wood Stoves 0 0High Turnover (Sit Down Restaurant) Wood Fireplaces 0 0High Turnover (Sit Down Restaurant) Gas Fireplaces 0 0High Turnover (Sit Down Restaurant) Propane Fireplaces 0 0High Turnover (Sit Down Restaurant) Electric Fireplaces 0 0High Turnover (Sit Down Restaurant) No Fireplaces 0 0High Turnover (Sit Down Restaurant) Conventional Wood Stoves 0 0High Turnover (Sit Down Restaurant) Catalytic Wood Stoves 0 0High Turnover (Sit Down Restaurant) Non-Catalytic Wood Stoves 0 0 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 97 / 112
High Turnover (Sit Down Restaurant) Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sqft)
Residential Exterior Area Coated (sqft)
Non-Residential Interior Area Coated(sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
466,560 155,520 352,631 117,242 6,515.70
5.10.3. Landscape Equipment
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.10.4. Landscape Equipment - Mitigated
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.11. Operational Energy Consumption5.11.1. UnmitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Hotel 2,883,485 260.788 0.0330 0.0040 6,031,741Apartments High Rise 816,394 260.788 0.0330 0.0040 3,286,841Supermarket 458,251 260.788 0.0330 0.0040 234,972Enclosed Parking Structure 107,844 260.788 0.0330 0.0040 0.00000Parking Lot 68,685.4 260.788 0.0330 0.0040 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 98 / 112
1,094,866 0.0040 0.0330 260.788 325,881 Fast Food Restaurant w/o Drive Thru
High Turnover (Sit DownRestaurant)
148,843 260.788 0.0330 0.0040 500,070
5.11.2. MitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Hotel 2,739,131 260.788 0.0330 0.0040 6,031,741Apartments High Rise 764,395 260.788 0.0330 0.0040 3,286,841Supermarket 301,890 260.788 0.0330 0.0040 234,972Enclosed Parking Structure 107,844 260.788 0.0330 0.0040 0.00000Parking Lot 68,685.4 260.788 0.0330 0.0040 0.00000Fast Food Restaurant w/oDrive Thru 279,308 260.788 0.0330 0.0040 1,094,866
High Turnover (Sit DownRestaurant)
127,572 260.788 0.0330 0.0040 500,070
5.12. Operational Water and Wastewater Consumption5.12.1. Unmitigated Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Hotel 3,602,081 12,927.6Apartments High Rise 9,096,822 15,800.3Supermarket 1,741,040 12,927.6Enclosed Parking Structure 0.00000 12,927.6Parking Lot 0.00000 12,927.6Fast Food Restaurant w/o Drive Thru 2,890,855 12,927.6High Turnover (Sit Down Restaurant) 1,320,372 12,927.6 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 99 / 112
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Hotel 3,602,081 12,927.6Apartments High Rise 9,096,822 15,800.3Supermarket 1,741,040 12,927.6Enclosed Parking Structure 0.00000 12,927.6Parking Lot 0.00000 12,927.6Fast Food Restaurant w/o Drive Thru 2,890,855 12,927.6High Turnover (Sit Down Restaurant) 1,320,372 12,927.6
5.13. Operational Waste Generation5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Hotel 77.7450 0.00000Apartments High Rise 177.375 0.00000Supermarket 79.6594 0.00000Enclosed Parking Structure 0.00000 0.00000Parking Lot 0.00000 0.00000Fast Food Restaurant w/o Drive Thru 109.706 0.00000High Turnover (Sit Down Restaurant) 51.7650 0.00000
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Hotel 19.4363 0.00000Apartments High Rise 44.3437 0.00000Supermarket 19.9148 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 100 / 112
Enclosed Parking Structure 0.00000 0.00000
Parking Lot 0.00000 0.00000Fast Food Restaurant w/o Drive Thru 27.4265 0.00000High Turnover (Sit Down Restaurant) 12.9412 0.00000
5.14. Operational Refrigeration and Air Conditioning Equipment5.14.1. Unmitigated Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedHotel Household refrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Hotel Other commercial A/C
and heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Hotel Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Apartments High Rise Average room A/C &
Other residential A/Cand heat pumps
R-410A 2,088.00 0.00225 2.50000 2.50000 10.00000
Apartments High Rise Household
refrigerators and/orfreezers
R-134a 1,430.00 0.11538 0.60000 0.00000 1.000000
Supermarket Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Supermarket Supermarket
refrigeration andcondensing units
R-404A 3,922.00 26.5200 16.5000 16.5000 18.0000
Fast Food Restaurantw/o Drive Thru
Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Fast Food Restaurantw/o Drive Thru
Other commercial A/Cand heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Fast Food Restaurantw/o Drive Thru
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 101 / 112
High Turnover (SitDown Restaurant)
Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
High Turnover (SitDown Restaurant)
Other commercial A/Cand heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
High Turnover (SitDown Restaurant)
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
5.14.2. Mitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedHotel Household refrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Hotel Other commercial A/C
and heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Hotel Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Apartments High Rise Average room A/C &
Other residential A/Cand heat pumps
R-410A 2,088.00 0.00225 2.50000 2.50000 10.00000
Apartments High Rise Household
refrigerators and/orfreezers
R-134a 1,430.00 0.11538 0.60000 0.00000 1.000000
Supermarket Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Supermarket Supermarket
refrigeration andcondensing units
R-404A 3,922.00 26.5200 16.5000 16.5000 18.0000
Fast Food Restaurantw/o Drive Thru
Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Fast Food Restaurantw/o Drive Thru
Other commercial A/Cand heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Fast Food Restaurantw/o Drive Thru
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 102 / 112
High Turnover (SitDown Restaurant)
Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
High Turnover (SitDown Restaurant)
Other commercial A/Cand heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
High Turnover (SitDown Restaurant)
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
5.15. Operational Off-Road Equipment5.15.1. Unmitigated5.15.2. Mitigated5.16. Stationary Sources5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers5.17. User Defined5.18. Vegetation5.18.1. Land Use Change5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 103 / 112
5.18.1. Biomass Cover Type5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report6.1. Climate Risk SummaryCal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 whichassumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location UnitTemperature and Extreme Heat 14.8400 annual days of extreme heatExtreme Precipitation 6.90000 annual days with precipitation above 20 mmSea Level Rise — meters of inundation depthWildfire 25.7100 annual hectares burned Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 104 / 112
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures fromobserved historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall ifreceived over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), andconsider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled withextreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 metersWildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical dataof climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. Thefour simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range ofdifferent rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1 0 0 N/AExtreme Precipitation N/A N/A N/A N/ASea Level Rise 1 0 0 N/AWildfire 1 0 0 N/AFlooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 0 0 0 N/A The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reductionmeasures.6.3. Adjusted Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1112Extreme Precipitation N/A N/A N/A N/ASea Level Rise 1 1 1 2 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 105 / 112
Wildfire 1112
Flooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 1112 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reductionmeasures.6.4. Climate Risk Reduction Measures7. Health and Equity Details7.1. CalEnviroScreen 4.0 ScoresThe maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census TractExposure Indicators —
AQ-Ozone 59.6889AQ-PM 41.1450AQ-DPM 81.7299Drinking Water 59.7727Lead Risk Housing 33.5854Pesticides 0.00000Toxic Releases 25.9565Traffic 86.6500Effect Indicators —
CleanUp Sites 0.00000Groundwater 22.1152
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 106 / 112
Haz Waste Facilities/Generators 40.1324
Impaired Water Bodies 86.9593Solid Waste 52.8981Sensitive Population —
Asthma 14.7931Cardio-vascular 19.4791Low Birth Weights 52.5404Socioeconomic Factor Indicators —Education 71.7540Housing 87.8834Linguistic 38.1378Poverty 46.6080Unemployment 60.5674
7.2. Healthy Places Index ScoresThe maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census TractEconomic
—
Above Poverty 43.9753625Employed 80.73912486Median HI 26.34415501Education —
Bachelor's or higher 52.44450148High school enrollment 100Preschool enrollment 77.6337739Transportation —
Auto Access 18.65776979Active commuting 53.41973566
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 107 / 112
Social
—
2-parent households 9.418709098Voting 62.64596433Neighborhood —
Alcohol availability 21.69896061Park access 81.35506224Retail density 88.31002181Supermarket access 73.66867702Tree canopy 65.52033877Housing —
Homeownership 22.10958553Housing habitability 14.59001668Low-inc homeowner severe housing cost burden 6.120877711Low-inc renter severe housing cost burden 37.22571539Uncrowded housing 61.41408957Health Outcomes —
Insured adults 34.59514949Arthritis 45.8Asthma ER Admissions 80.1High Blood Pressure 39.5Cancer (excluding skin) 34.5Asthma 37.3Coronary Heart Disease 43.7Chronic Obstructive Pulmonary Disease 35.3Diagnosed Diabetes 70.5Life Expectancy at Birth 24.2Cognitively Disabled 16.7Physically Disabled 26.6 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 108 / 112
Heart Attack ER Admissions 63.6
Mental Health Not Good 43.4Chronic Kidney Disease 55.3Obesity 47.8Pedestrian Injuries 48.7Physical Health Not Good 46.9Stroke 45.2Health Risk Behaviors —
Binge Drinking 26.9Current Smoker 45.9No Leisure Time for Physical Activity 48.0Climate Change Exposures —Wildfire Risk 17.9SLR Inundation Area 0.0Children 64.0Elderly 47.3English Speaking 51.5Foreign-born 55.9Outdoor Workers 82.9Climate Change Adaptive Capacity —Impervious Surface Cover 64.0Traffic Density 94.4Traffic Access 23.0Other Indices —
Hardship 53.4Other Decision Support
—
2016 Voting 69.3
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 109 / 112
7.3. Overall Health & Equity Scores
Metric Result for Project Census TractCalEnviroScreen 4.0 Score for Project Location (a) 51.0000Healthy Places Index Score for Project Location (b) 47.0000Project Located in a Designated Disadvantaged Community (Senate Bill 535) NoProject Located in a Low-Income Community (Assembly Bill 1550) YesProject Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.7.4. Health & Equity MeasuresNo Health & Equity Measures selected.7.5. Evaluation ScorecardHealth & Equity Evaluation Scorecard not completed.7.6. Health & Equity Custom MeasuresNo Health & Equity Custom Measures created.8. User Changes to Default Data8.1. Justifications Screen JustificationConstruction: Construction Phases As per the applicant.Construction: Off-Road Equipment As per MM AQ-1Construction: Trips and VMT As per the applicant.Operations: Vehicle Data Based on the Associated Transportation Engineers #24075, Trip Generation Worksheet
8.4. Construction
Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 110 / 112
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New ValueGrading Grading Start Date 11/14/2028 10/1/2028Grading Grading End Date 12/26/2028 1/31/2029Grading Grading Work Days per Phase 30.0000 88.0000Building Construction Building Construction Start Date 12/27/2028 2/1/2029Building Construction Building Construction End Date 2/20/2030 9/30/2031Building Construction Building Construction Work Days per Phase 300.000 694.000Paving Paving Start Date 2/21/2030 7/1/2031Paving Paving End Date 3/21/2030 10/31/2031Paving Paving Work Days per Phase 20.0000 89.0000Architectural Coating Architectural Coating Start Date 3/22/2030 3/1/2031Architectural Coating Architectural Coating End Date 4/19/2030 12/31/2031Architectural Coating Architectural Coating Work Days per Phase 20.0000 218.000
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New ValueGrading Graders Engine Tier Average Tier 4 FinalGrading Rubber Tired Dozers Engine Tier Average Tier 4 FinalGrading Scrapers Engine Tier Average Tier 4 FinalGrading Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalBuilding Construction Cranes Engine Tier Average Tier 4 FinalBuilding Construction Forklifts Engine Tier Average Tier 4 FinalBuilding Construction Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalPaving Pavers Engine Tier Average Tier 4 FinalPaving Paving Equipment Engine Tier Average Tier 4 Final Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 111 / 112
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New ValueGrading Hauling Miles per Trip 20.0000 9.00000
8.5. Operations8.5.1. Mobile Sources8.5.1.1. Vehicle Data Land Use Model Parameter Units Default Value New ValueHotel Weekday Trip Rate size/day 8.36000 5.84000Hotel Saturday Trip Rate size/day 8.19000 5.84000Hotel Sunday Trip Rate size/day 5.95000 5.84000Apartments High Rise Weekday Trip Rate size/day 4.45000 4.34800Apartments High Rise Saturday Trip Rate size/day 4.53000 4.34800Apartments High Rise Sunday Trip Rate size/day 3.59000 4.34800Supermarket Weekday Trip Rate size/day 106.780 26.6810Supermarket Saturday Trip Rate size/day 177.620 26.6810Supermarket Sunday Trip Rate size/day 166.470 26.6810Supermarket Weekday Primary Trip % 30.3300 100.0000Supermarket Weekday Divert Trip % 33.6700 0.00000Supermarket Weekday Pass-By Trip % 36.0000 0.00000Fast Food Restaurant w/o Drive Thru Weekday Trip Rate size/day 346.230 107.525Fast Food Restaurant w/o Drive Thru Saturday Trip Rate size/day 696.000 107.525Fast Food Restaurant w/o Drive Thru Sunday Trip Rate size/day 500.000 107.525High Turnover (Sit Down Restaurant) Weekday Trip Rate size/day 112.180 49.3900High Turnover (Sit Down Restaurant) Saturday Trip Rate size/day 122.400 49.3900High Turnover (Sit Down Restaurant) Sunday Trip Rate size/day 142.640 49.3900 Thousand Oaks Downtown Specific Plan: Phase 2A_Mitigated v5 Detailed Report, 4/28/2026 112 / 112
High Turnover (Sit Down Restaurant) Weekday Primary Trip % 33.3500 100.0000 High Turnover (Sit Down Restaurant) Weekday Divert Trip % 23.6500 0.00000High Turnover (Sit Down Restaurant) Weekday Pass-By Trip % 43.0000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 1 / 91
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report Table of Contents1. Basic Project Information
1.1. Basic Project Information1.2. Land Use Types1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated2.2.2. Onsite Construction Emissions by Year, Unmitigated2.2.3. Offsite Construction Emissions by Year, Unmitigated2.2.4. Total Construction Emissions by Year, Mitigated2.2.5. Onsite Construction Emissions by Year, Mitigated2.2.6. Offsite Construction Emissions by Year, Mitigated
2.3. Operations Emissions Compared Against Thresholds2.4. Operations Emissions by Sector, Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 2 / 91
2.5. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Grading (2028)
3.1.1. Onsite - Unmitigated3.1.2. Offsite - Unmitigated3.1.3. Onsite - Mitigated3.1.4. Offsite - Mitigated
3.2. Grading (2029)
3.2.1. Onsite - Unmitigated3.2.2. Offsite - Unmitigated3.2.3. Onsite - Mitigated3.2.4. Offsite - Mitigated
3.3. Building Construction (2029)
3.3.1. Onsite - Unmitigated3.3.2. Offsite - Unmitigated3.3.3. Onsite - Mitigated3.3.4. Offsite - Mitigated
3.4. Building Construction (2030)
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 3 / 91
3.4.1. Onsite - Unmitigated3.4.2. Offsite - Unmitigated3.4.3. Onsite - Mitigated3.4.4. Offsite - Mitigated
3.5. Building Construction (2031)
3.5.1. Onsite - Unmitigated3.5.2. Offsite - Unmitigated3.5.3. Onsite - Mitigated3.5.4. Offsite - Mitigated
3.6. Paving (2031)
3.6.1. Onsite - Unmitigated3.6.2. Offsite - Unmitigated3.6.3. Onsite - Mitigated3.6.4. Offsite - Mitigated
3.7. Architectural Coating (2031)
3.7.1. Onsite - Unmitigated3.7.2. Offsite - Unmitigated3.7.3. Onsite - Mitigated Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 4 / 91
3.7.4. Offsite - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated4.2.2. Electricity Emissions By Land Use - Mitigated4.2.3. Natural Gas Emissions By Land Use - Unmitigated4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 5 / 91
4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 6 / 91
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule5.2. Off-Road Equipment
5.2.1. Unmitigated5.2.2. Mitigated
5.3. Construction Vehicles
5.3.1. Unmitigated5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving5.8. Construction Electricity Consumption and Emissions Factors Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 7 / 91
5.9. Operational Mobile Sources
5.9.1. Unmitigated5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths5.10.2. Architectural Coatings5.10.3. Landscape Equipment5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 8 / 91
5.14.1. Unmitigated5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers
5.17. User Defined5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 9 / 91
5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary6.2. Initial Climate Risk Scores6.3. Adjusted Climate Risk Scores6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores7.2. Healthy Places Index Scores7.3. Overall Health & Equity Scores7.4. Health & Equity Measures7.5. Evaluation Scorecard7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications8.4. Construction
8.4.1. Construction Phases8.4.2. Off-Road Equipment
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 10 / 91
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 11 / 91
1. Basic Project Information1.1. Basic Project Information Data Field ValueProject Name Thousand Oaks Downtown Specific Plan: Phase 2B v2Construction Start Date 10/1/2028Operational Year 2031Lead Agency —
Land Use Scale Project/siteAnalysis Level for Defaults CountyWindspeed (m/s) 2.70000Precipitation (days) 22.6000Location 34.17486881949958, -118.84857164071227County VenturaCity Thousand OaksAir District Ventura County APCDAir Basin South Central CoastTAZ 3505EDFZ 8Electric Utility Southern California EdisonGas Utility Southern California GasApp Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special LandscapeArea (sq ft)
Population Description
High Turnover (SitDown Restaurant)
6.72500 1000sqft 0.15438 6,725.00 1,000.000 — — —
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 12 / 91
City Park 2.00000 Acre 2.00000 0.00000 13,915.0 13,915.0 — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector
# Measure Title
Construction C-10-A Water Exposed SurfacesConstruction C-10-C Water Unpaved Construction RoadsConstruction C-11 Limit Vehicle Speeds on Unpaved RoadsConstruction C-12 Sweep Paved RoadsTransportation T-7 Implement Commute Trip Reduction MarketingTransportation T-8 Provide Ridesharing ProgramTransportation T-10 Provide End-of-Trip Bicycle FacilitiesWater W-4 Require Low-Flow Water FixturesWater W-5 Design Water-Efficient LandscapesWaste S-1/S-2 Implement Waste Reduction PlanArea Sources LL-1 Replace Gas Powered Landscape Equipment with Zero-Emission Landscape Equipment
Area Sources AS-2 Use Low-VOC Paints
2. Emissions Summary2.1. Construction Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Unmit. 1.55854 1.37445 8.42996 24.0815 0.03690 0.19716 0.24980 0.44696 0.18502 0.05895 0.24396 — 3,828.15 3,828.15 0.14796 0.03463 0.57341 3,842.74Mit. 1.55854 1.37445 8.42996 24.0815 0.03690 0.19716 0.24980 0.44696 0.18502 0.05895 0.24396 — 3,828.15 3,828.15 0.14796 0.03463 0.57341 3,842.74 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 13 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
%Reduced
Daily,Winter(Max)
——————————————————
Unmit. 0.81419 0.73450 5.18323 14.7395 0.02340 0.11731 7.24241 7.28998 0.11018 3.46344 3.51101 — 2,678.50 2,678.50 0.10345 0.04121 0.01552 2,693.38Mit. 0.81419 0.73450 5.18323 14.7395 0.02340 0.11731 2.92158 2.96915 0.11018 1.37429 1.42186 — 2,678.50 2,678.50 0.10345 0.04121 0.01552 2,693.38%Reduced — — — — — — 60% 59% — 60% 60% — — — — — — —
AverageDaily(Max)
——————————————————
Unmit. 0.63696 0.55920 3.66767 9.96241 0.01669 0.07956 1.30352 1.31208 0.07490 0.62346 0.63202 — 1,643.20 1,643.20 0.06520 0.01802 0.07721 1,650.26Mit. 0.63696 0.55920 3.66767 9.96241 0.01669 0.07956 0.52560 0.53416 0.07490 0.24733 0.25589 — 1,643.20 1,643.20 0.06520 0.01802 0.07721 1,650.26%Reduced — — — — — — 60% 59% — 60% 60% — — — — — — —
Annual(Max)
——————————————————
Unmit. 0.11624 0.10205 0.66935 1.81814 0.00305 0.01452 0.23789 0.23945 0.01367 0.11378 0.11534 — 272.050 272.050 0.01079 0.00298 0.01278 273.219Mit. 0.11624 0.10205 0.66935 1.81814 0.00305 0.01452 0.09592 0.09749 0.01367 0.04514 0.04670 — 272.050 272.050 0.01079 0.00298 0.01278 273.219%Reduced — — — — — — 60% 59% — 60% 60% — — — — — — —
2.2. Construction Emissions by Year2.2.1. Total Construction Emissions by Year, UnmitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.78480 0.67404 5.17916 13.7683 0.02337 0.11731 0.04635 0.16366 0.11018 0.01126 0.12144 — 2,267.22 2,267.22 0.09011 0.02383 0.16220 2,276.74 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 14 / 91
2030 0.76174 0.65400 5.13225 13.7378 0.02337 0.10839 0.04635 0.15474 0.10197 0.01126 0.11323 — 2,265.67 2,265.67 0.09011 0.02358 0.14372 2,275.10 2031 1.55854 1.37445 8.42996 24.0815 0.03690 0.19716 0.24980 0.44696 0.18502 0.05895 0.24396 — 3,828.15 3,828.15 0.14796 0.03463 0.57341 3,842.74Daily -Winter(Max) ——————————————————
2028 0.27369 0.27022 1.37232 14.7395 0.02340 0.04757 7.24241 7.28998 0.04757 3.46344 3.51101 — 2,678.50 2,678.50 0.10345 0.04121 0.01552 2,693.382029 0.78469 0.67274 5.18323 14.7087 0.02339 0.11731 7.24241 7.28998 0.11018 3.46344 3.51101 — 2,671.90 2,671.90 0.10313 0.04047 0.01405 2,686.552030 0.76165 0.65382 5.13488 13.7251 0.02337 0.10839 0.04635 0.15474 0.10197 0.01126 0.11323 — 2,264.17 2,264.17 0.09018 0.02358 0.00373 2,273.462031 0.81419 0.73450 5.09468 13.7009 0.02337 0.10098 0.20345 0.29963 0.09516 0.04769 0.13754 — 2,262.65 2,262.65 0.09011 0.02358 0.01162 2,271.93AverageDaily ——————————————————
2028 0.04929 0.04870 0.24700 2.65401 0.00421 0.00856 1.30352 1.31208 0.00856 0.62346 0.63202 — 482.390 482.390 0.01859 0.00738 0.04653 485.1002029 0.52934 0.45569 3.46947 9.88331 0.01669 0.07956 0.46910 0.54866 0.07490 0.21733 0.29223 — 1,643.20 1,643.20 0.06520 0.01802 0.05991 1,650.262030 0.54398 0.46694 3.66767 9.80416 0.01669 0.07742 0.03264 0.11006 0.07284 0.00793 0.08076 — 1,617.43 1,617.43 0.06437 0.01684 0.04433 1,624.102031 0.63696 0.55920 3.62690 9.96241 0.01598 0.07849 0.07414 0.15263 0.07375 0.01757 0.09132 — 1,604.73 1,604.73 0.06298 0.01728 0.07721 1,611.53Annual — — — — — — — — — — — — — — — — — —2028 0.00900 0.00889 0.04508 0.48436 0.00077 0.00156 0.23789 0.23945 0.00156 0.11378 0.11534 — 79.8652 79.8652 0.00308 0.00122 0.00770 80.31392029 0.09660 0.08316 0.63318 1.80370 0.00305 0.01452 0.08561 0.10013 0.01367 0.03966 0.05333 — 272.050 272.050 0.01079 0.00298 0.00992 273.2192030 0.09928 0.08522 0.66935 1.78926 0.00305 0.01413 0.00596 0.02009 0.01329 0.00145 0.01474 — 267.784 267.784 0.01066 0.00279 0.00734 268.8892031 0.11624 0.10205 0.66191 1.81814 0.00292 0.01432 0.01353 0.02785 0.01346 0.00321 0.01667 — 265.681 265.681 0.01043 0.00286 0.01278 266.806
2.2.2. Onsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 0.00000 0.11706 0.10993 0.00000 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.602030 0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 0.00000 0.10814 0.10173 0.00000 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.602031 1.49417 1.31881 8.35143 23.2934 0.03665 0.19691 0.00000 0.19691 0.18477 0.00000 0.18477 — 3,577.97 3,577.97 0.14514 0.02903 0.00000 3,590.25 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 15 / 91
Daily -Winter(Max)
——————————————————
2028 0.23093 0.23093 1.20083 14.2408 0.02268 0.04619 7.08331 7.12950 0.04619 3.42485 3.47103 — 2,456.26 2,456.26 0.09964 0.01993 0.00000 2,464.692029 0.77273 0.66287 5.13610 14.2408 0.02312 0.11706 7.08331 7.12950 0.10993 3.42485 3.47103 — 2,454.55 2,454.55 0.09957 0.01991 0.00000 2,462.972030 0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 0.00000 0.10814 0.10173 0.00000 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.602031 0.76066 0.68835 5.05339 13.5816 0.02312 0.10074 0.00000 0.10074 0.09491 0.00000 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.60AverageDaily ——————————————————
2028 0.04158 0.04158 0.21620 2.56390 0.00408 0.00832 1.27527 1.28359 0.00832 0.61661 0.62492 — 442.224 442.224 0.01794 0.00359 0.00000 443.7412029 0.51908 0.44728 3.42991 9.76649 0.01649 0.07932 0.42971 0.50903 0.07466 0.20777 0.28243 — 1,587.55 1,587.55 0.06440 0.01288 0.00000 1,593.002030 0.53600 0.46029 3.63640 9.71301 0.01651 0.07724 0.00000 0.07724 0.07266 0.00000 0.07266 — 1,572.17 1,572.17 0.06377 0.01275 0.00000 1,577.572031 0.61802 0.54303 3.59333 9.75098 0.01585 0.07835 0.00000 0.07835 0.07361 0.00000 0.07361 — 1,527.01 1,527.01 0.06194 0.01239 0.00000 1,532.25Annual — — — — — — — — — — — — — — — — — —2028 0.00759 0.00759 0.03946 0.46791 0.00075 0.00152 0.23274 0.23426 0.00152 0.11253 0.11405 — 73.2152 73.2152 0.00297 0.00059 0.00000 73.46642029 0.09473 0.08163 0.62596 1.78238 0.00301 0.01448 0.07842 0.09290 0.01362 0.03792 0.05154 — 262.838 262.838 0.01066 0.00213 0.00000 263.7402030 0.09782 0.08400 0.66364 1.77262 0.00301 0.01410 0.00000 0.01410 0.01326 0.00000 0.01326 — 260.291 260.291 0.01056 0.00211 0.00000 261.1852031 0.11279 0.09910 0.65578 1.77955 0.00289 0.01430 0.00000 0.01430 0.01343 0.00000 0.01343 — 252.813 252.813 0.01026 0.00205 0.00000 253.681
2.2.3. Offsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.01207 0.01117 0.04306 0.14791 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 66.1762 66.1762 0.00083 0.00597 0.16220 68.13832030 0.01134 0.00958 0.04129 0.13958 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 64.6281 64.6281 0.00083 0.00572 0.14372 66.49782031 0.06437 0.05564 0.07853 0.78811 0.00025 0.00025 0.24980 0.25005 0.00025 0.05895 0.05919 — 250.180 250.180 0.00283 0.00560 0.57341 252.493Daily -Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 16 / 91
2028 0.04276 0.03929 0.17149 0.49875 0.00073 0.00138 0.15909 0.16047 0.00138 0.03860 0.03998 — 222.239 222.239 0.00382 0.02128 0.01552 228.691 2029 0.04166 0.03411 0.16539 0.46792 0.00073 0.00138 0.15909 0.16047 0.00138 0.03860 0.03998 — 217.350 217.350 0.00356 0.02055 0.01405 223.5772030 0.01125 0.00941 0.04392 0.12690 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 63.1292 63.1292 0.00089 0.00572 0.00373 64.86052031 0.05353 0.04615 0.04804 0.59639 0.00025 0.00025 0.20345 0.20345 0.00025 0.04769 0.04769 — 178.879 178.879 0.00240 0.00738 0.01162 181.149AverageDaily ——————————————————
2028 0.00771 0.00713 0.03081 0.09011 0.00013 0.00025 0.02824 0.02849 0.00025 0.00685 0.00710 — 40.1663 40.1663 0.00065 0.00379 0.04653 41.35882029 0.01026 0.00842 0.03956 0.11682 0.00021 0.00025 0.03939 0.03963 0.00025 0.00956 0.00981 — 55.6447 55.6447 0.00080 0.00514 0.05991 57.25512030 0.00798 0.00665 0.03127 0.09115 0.00018 0.00018 0.03264 0.03282 0.00018 0.00793 0.00810 — 45.2556 45.2556 0.00059 0.00409 0.04433 46.53282031 0.01894 0.01617 0.03357 0.21143 0.00013 0.00013 0.07414 0.07427 0.00013 0.01757 0.01770 — 77.7182 77.7182 0.00104 0.00489 0.07721 79.2777Annual — — — — — — — — — — — — — — — — — —2028 0.00141 0.00130 0.00562 0.01645 0.00002 0.00005 0.00515 0.00520 0.00005 0.00125 0.00130 — 6.64998 6.64998 0.00011 0.00063 0.00770 6.847422029 0.00187 0.00154 0.00722 0.02132 0.00004 0.00004 0.00719 0.00723 0.00004 0.00174 0.00179 — 9.21262 9.21262 0.00013 0.00085 0.00992 9.479232030 0.00146 0.00121 0.00571 0.01663 0.00003 0.00003 0.00596 0.00599 0.00003 0.00145 0.00148 — 7.49257 7.49257 0.00010 0.00068 0.00734 7.704032031 0.00346 0.00295 0.00613 0.03859 0.00002 0.00002 0.01353 0.01355 0.00002 0.00321 0.00323 — 12.8671 12.8671 0.00017 0.00081 0.01278 13.1253
2.2.4. Total Construction Emissions by Year, MitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.78480 0.67404 5.17916 13.7683 0.02337 0.11731 0.04635 0.16366 0.11018 0.01126 0.12144 — 2,267.22 2,267.22 0.09011 0.02383 0.16220 2,276.742030 0.76174 0.65400 5.13225 13.7378 0.02337 0.10839 0.04635 0.15474 0.10197 0.01126 0.11323 — 2,265.67 2,265.67 0.09011 0.02358 0.14372 2,275.102031 1.55854 1.37445 8.42996 24.0815 0.03690 0.19716 0.24980 0.44696 0.18502 0.05895 0.24396 — 3,828.15 3,828.15 0.14796 0.03463 0.57341 3,842.74Daily -Winter(Max) ——————————————————
2028 0.27369 0.27022 1.37232 14.7395 0.02340 0.04757 2.92158 2.96915 0.04757 1.37429 1.42186 — 2,678.50 2,678.50 0.10345 0.04121 0.01552 2,693.38 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 17 / 91
2029 0.78469 0.67274 5.18323 14.7087 0.02339 0.11731 2.92158 2.96915 0.11018 1.37429 1.42186 — 2,671.90 2,671.90 0.10313 0.04047 0.01405 2,686.55 2030 0.76165 0.65382 5.13488 13.7251 0.02337 0.10839 0.04635 0.15474 0.10197 0.01126 0.11323 — 2,264.17 2,264.17 0.09018 0.02358 0.00373 2,273.462031 0.81419 0.73450 5.09468 13.7009 0.02337 0.10098 0.20345 0.29963 0.09516 0.04769 0.13754 — 2,262.65 2,262.65 0.09011 0.02358 0.01162 2,271.93AverageDaily ——————————————————
2028 0.04929 0.04870 0.24700 2.65401 0.00421 0.00856 0.52560 0.53416 0.00856 0.24733 0.25589 — 482.390 482.390 0.01859 0.00738 0.04653 485.1002029 0.52934 0.45569 3.46947 9.88331 0.01669 0.07956 0.20697 0.28654 0.07490 0.09059 0.16549 — 1,643.20 1,643.20 0.06520 0.01802 0.05991 1,650.262030 0.54398 0.46694 3.66767 9.80416 0.01669 0.07742 0.03264 0.11006 0.07284 0.00793 0.08076 — 1,617.43 1,617.43 0.06437 0.01684 0.04433 1,624.102031 0.63696 0.55920 3.62690 9.96241 0.01598 0.07849 0.07414 0.15263 0.07375 0.01757 0.09132 — 1,604.73 1,604.73 0.06298 0.01728 0.07721 1,611.53Annual — — — — — — — — — — — — — — — — — —2028 0.00900 0.00889 0.04508 0.48436 0.00077 0.00156 0.09592 0.09749 0.00156 0.04514 0.04670 — 79.8652 79.8652 0.00308 0.00122 0.00770 80.31392029 0.09660 0.08316 0.63318 1.80370 0.00305 0.01452 0.03777 0.05229 0.01367 0.01653 0.03020 — 272.050 272.050 0.01079 0.00298 0.00992 273.2192030 0.09928 0.08522 0.66935 1.78926 0.00305 0.01413 0.00596 0.02009 0.01329 0.00145 0.01474 — 267.784 267.784 0.01066 0.00279 0.00734 268.8892031 0.11624 0.10205 0.66191 1.81814 0.00292 0.01432 0.01353 0.02785 0.01346 0.00321 0.01667 — 265.681 265.681 0.01043 0.00286 0.01278 266.806
2.2.5. Onsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 0.00000 0.11706 0.10993 0.00000 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.602030 0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 0.00000 0.10814 0.10173 0.00000 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.602031 1.49417 1.31881 8.35143 23.2934 0.03665 0.19691 0.00000 0.19691 0.18477 0.00000 0.18477 — 3,577.97 3,577.97 0.14514 0.02903 0.00000 3,590.25Daily -Winter(Max) ——————————————————
2028 0.23093 0.23093 1.20083 14.2408 0.02268 0.04619 2.76249 2.80868 0.04619 1.33569 1.38188 — 2,456.26 2,456.26 0.09964 0.01993 0.00000 2,464.692029 0.77273 0.66287 5.13610 14.2408 0.02312 0.11706 2.76249 2.80868 0.10993 1.33569 1.38188 — 2,454.55 2,454.55 0.09957 0.01991 0.00000 2,462.972030 0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 0.00000 0.10814 0.10173 0.00000 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.60 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 18 / 91
2031 0.76066 0.68835 5.05339 13.5816 0.02312 0.10074 0.00000 0.10074 0.09491 0.00000 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 0.00000 2,208.60 AverageDaily
——————————————————
2028 0.04158 0.04158 0.21620 2.56390 0.00408 0.00832 0.49736 0.50567 0.00832 0.24048 0.24879 — 442.224 442.224 0.01794 0.00359 0.00000 443.7412029 0.51908 0.44728 3.42991 9.76649 0.01649 0.07932 0.16759 0.24690 0.07466 0.08103 0.15569 — 1,587.55 1,587.55 0.06440 0.01288 0.00000 1,593.002030 0.53600 0.46029 3.63640 9.71301 0.01651 0.07724 0.00000 0.07724 0.07266 0.00000 0.07266 — 1,572.17 1,572.17 0.06377 0.01275 0.00000 1,577.572031 0.61802 0.54303 3.59333 9.75098 0.01585 0.07835 0.00000 0.07835 0.07361 0.00000 0.07361 — 1,527.01 1,527.01 0.06194 0.01239 0.00000 1,532.25Annual — — — — — — — — — — — — — — — — — —2028 0.00759 0.00759 0.03946 0.46791 0.00075 0.00152 0.09077 0.09229 0.00152 0.04389 0.04540 — 73.2152 73.2152 0.00297 0.00059 0.00000 73.46642029 0.09473 0.08163 0.62596 1.78238 0.00301 0.01448 0.03058 0.04506 0.01362 0.01479 0.02841 — 262.838 262.838 0.01066 0.00213 0.00000 263.7402030 0.09782 0.08400 0.66364 1.77262 0.00301 0.01410 0.00000 0.01410 0.01326 0.00000 0.01326 — 260.291 260.291 0.01056 0.00211 0.00000 261.1852031 0.11279 0.09910 0.65578 1.77955 0.00289 0.01430 0.00000 0.01430 0.01343 0.00000 0.01343 — 252.813 252.813 0.01026 0.00205 0.00000 253.681
2.2.6. Offsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.01207 0.01117 0.04306 0.14791 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 66.1762 66.1762 0.00083 0.00597 0.16220 68.13832030 0.01134 0.00958 0.04129 0.13958 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 64.6281 64.6281 0.00083 0.00572 0.14372 66.49782031 0.06437 0.05564 0.07853 0.78811 0.00025 0.00025 0.24980 0.25005 0.00025 0.05895 0.05919 — 250.180 250.180 0.00283 0.00560 0.57341 252.493Daily -Winter(Max) ——————————————————
2028 0.04276 0.03929 0.17149 0.49875 0.00073 0.00138 0.15909 0.16047 0.00138 0.03860 0.03998 — 222.239 222.239 0.00382 0.02128 0.01552 228.6912029 0.04166 0.03411 0.16539 0.46792 0.00073 0.00138 0.15909 0.16047 0.00138 0.03860 0.03998 — 217.350 217.350 0.00356 0.02055 0.01405 223.5772030 0.01125 0.00941 0.04392 0.12690 0.00025 0.00025 0.04635 0.04660 0.00025 0.01126 0.01151 — 63.1292 63.1292 0.00089 0.00572 0.00373 64.86052031 0.05353 0.04615 0.04804 0.59639 0.00025 0.00025 0.20345 0.20345 0.00025 0.04769 0.04769 — 178.879 178.879 0.00240 0.00738 0.01162 181.149 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 19 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Average
Daily
2028 0.00771 0.00713 0.03081 0.09011 0.00013 0.00025 0.02824 0.02849 0.00025 0.00685 0.00710 — 40.1663 40.1663 0.00065 0.00379 0.04653 41.35882029 0.01026 0.00842 0.03956 0.11682 0.00021 0.00025 0.03939 0.03963 0.00025 0.00956 0.00981 — 55.6447 55.6447 0.00080 0.00514 0.05991 57.25512030 0.00798 0.00665 0.03127 0.09115 0.00018 0.00018 0.03264 0.03282 0.00018 0.00793 0.00810 — 45.2556 45.2556 0.00059 0.00409 0.04433 46.53282031 0.01894 0.01617 0.03357 0.21143 0.00013 0.00013 0.07414 0.07427 0.00013 0.01757 0.01770 — 77.7182 77.7182 0.00104 0.00489 0.07721 79.2777Annual — — — — — — — — — — — — — — — — — —2028 0.00141 0.00130 0.00562 0.01645 0.00002 0.00005 0.00515 0.00520 0.00005 0.00125 0.00130 — 6.64998 6.64998 0.00011 0.00063 0.00770 6.847422029 0.00187 0.00154 0.00722 0.02132 0.00004 0.00004 0.00719 0.00723 0.00004 0.00174 0.00179 — 9.21262 9.21262 0.00013 0.00085 0.00992 9.479232030 0.00146 0.00121 0.00571 0.01663 0.00003 0.00003 0.00596 0.00599 0.00003 0.00145 0.00148 — 7.49257 7.49257 0.00010 0.00068 0.00734 7.704032031 0.00346 0.00295 0.00613 0.03859 0.00002 0.00002 0.01353 0.01355 0.00002 0.00321 0.00323 — 12.8671 12.8671 0.00017 0.00081 0.01278 13.1253
2.3. Operations Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Unmit. 1.50566 1.39371 1.08455 9.46784 0.02597 0.03096 2.55276 2.58372 0.02991 0.64736 0.67727 47.1342 2,941.76 2,988.89 4.85889 0.11199 16.1769 3,159.91Mit. 1.30235 1.20539 0.98270 8.15228 0.02314 0.02878 2.26260 2.29138 0.02796 0.57378 0.60173 14.7172 2,652.71 2,667.43 1.60802 0.10067 15.5331 2,753.16%Reduced 14% 14% 9% 14% 11% 7% 11% 11% 7% 11% 11% 69% 10% 11% 67% 10% 4% 13% Daily,Winter(Max)
——————————————————
Unmit. 1.44577 1.33521 1.18415 8.97044 0.02510 0.03045 2.55276 2.58321 0.02952 0.64736 0.67688 47.1342 2,854.05 2,901.18 4.86582 0.11869 10.6597 3,068.86Mit. 1.29543 1.19614 1.07316 7.97066 0.02239 0.02878 2.26260 2.29139 0.02796 0.57378 0.60174 14.7172 2,575.91 2,590.62 1.61418 0.10661 10.6431 2,673.39%Reduced 10% 10% 9% 11% 11% 5% 11% 11% 5% 11% 11% 69% 10% 11% 67% 10% < 0.5% 13% Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 20 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Average
Daily(Max)
Unmit. 1.46038 1.34895 1.16541 8.99349 0.02524 0.03070 2.51568 2.54638 0.02971 0.63809 0.66780 47.1342 2,868.15 2,915.29 4.86312 0.11704 12.9585 3,084.70Mit. 1.28561 1.18731 1.05548 7.86324 0.02250 0.02878 2.22974 2.25852 0.02796 0.56556 0.59352 14.7172 2,587.95 2,602.66 1.61177 0.10515 12.6806 2,686.98%Reduced 12% 12% 9% 13% 11% 6% 11% 11% 6% 11% 11% 69% 10% 11% 67% 10% 2% 13% Annual(Max)
——————————————————
Unmit. 0.26652 0.24618 0.21269 1.64131 0.00461 0.00560 0.45911 0.46471 0.00542 0.11645 0.12187 7.80360 474.855 482.659 0.80514 0.01938 2.14544 510.708Mit. 0.23462 0.21668 0.19262 1.43504 0.00411 0.00525 0.40693 0.41218 0.00510 0.10322 0.10832 2.43660 428.464 430.901 0.26685 0.01741 2.09941 444.859%Reduced 12% 12% 9% 13% 11% 6% 11% 11% 6% 11% 11% 69% 10% 11% 67% 10% 2% 13%
2.4. Operations Emissions by Sector, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Mobile 1.27038 1.17386 0.87443 9.00092 0.02471 0.01466 2.55276 2.56742 0.01374 0.64736 0.66109 — 2,516.88 2,516.88 0.09362 0.09929 5.66398 2,554.48Area 0.21245 0.20843 0.00246 0.29249 0.00002 0.00052 — 0.00052 0.00039 — 0.00039 — 1.20274 1.20274 0.00005 0.00001 — 1.20708Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.176 412.176 0.04273 0.00299 — 414.134Water — — — — — — — — — — — 3.91154 11.4929 15.4045 0.40254 0.00971 — 28.3603Waste — — — — — — — — — — — 43.2226 0.00000 43.2226 4.31995 0.00000 — 151.221Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.50566 1.39371 1.08455 9.46784 0.02597 0.03096 2.55276 2.58372 0.02991 0.64736 0.67727 47.1342 2,941.76 2,988.89 4.85889 0.11199 16.1769 3,159.91Daily,Winter(Max) ——————————————————
Mobile 1.26256 1.16343 0.97649 8.79601 0.02385 0.01467 2.55276 2.56743 0.01374 0.64736 0.66110 — 2,430.38 2,430.38 0.10060 0.10599 0.14686 2,464.63 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 21 / 91
Area 0.16037 0.16037 ————————————————
Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.176 412.176 0.04273 0.00299 — 414.134Water — — — — — — — — — — — 3.91154 11.4929 15.4045 0.40254 0.00971 — 28.3603Waste — — — — — — — — — — — 43.2226 0.00000 43.2226 4.31995 0.00000 — 151.221Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.44577 1.33521 1.18415 8.97044 0.02510 0.03045 2.55276 2.58321 0.02952 0.64736 0.67688 47.1342 2,854.05 2,901.18 4.86582 0.11869 10.6597 3,068.86AverageDaily ——————————————————
Mobile 1.25149 1.15346 0.95654 8.67482 0.02398 0.01467 2.51568 2.53035 0.01374 0.63809 0.65183 — 2,443.89 2,443.89 0.09788 0.10435 2.44566 2,479.88Area 0.18605 0.18407 0.00121 0.14424 0.00001 0.00026 — 0.00026 0.00019 — 0.00019 — 0.59313 0.59313 0.00002 0.00001 — 0.59527Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.176 412.176 0.04273 0.00299 — 414.134Water — — — — — — — — — — — 3.91154 11.4929 15.4045 0.40254 0.00971 — 28.3603Waste — — — — — — — — — — — 43.2226 0.00000 43.2226 4.31995 0.00000 — 151.221Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.46038 1.34895 1.16541 8.99349 0.02524 0.03070 2.51568 2.54638 0.02971 0.63809 0.66780 47.1342 2,868.15 2,915.29 4.86312 0.11704 12.9585 3,084.70Annual — — — — — — — — — — — — — — — — — —Mobile 0.22840 0.21051 0.17457 1.58315 0.00438 0.00268 0.45911 0.46179 0.00251 0.11645 0.11896 — 404.614 404.614 0.01620 0.01728 0.40491 410.572Area 0.03395 0.03359 0.00022 0.02632 <
0.000005
0.00005 — 0.00005 0.00004 — 0.00004 — 0.09820 0.09820 <
0.000005
<0.000005
— 0.09855
Energy 0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 68.2404 68.2404 0.00707 0.00049 — 68.5647Water — — — — — — — — — — — 0.64760 1.90278 2.55038 0.06664 0.00161 — 4.69537Waste — — — — — — — — — — — 7.15600 0.00000 7.15600 0.71522 0.00000 — 25.0364Refrig. — — — — — — — — — — — — — — — — 1.74053 1.74053Total 0.26652 0.24618 0.21269 1.64131 0.00461 0.00560 0.45911 0.46471 0.00542 0.11645 0.12187 7.80360 474.855 482.659 0.80514 0.01938 2.14544 510.708
2.5. Operations Emissions by Sector, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 22 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Mobile 1.12598 1.04044 0.77504 7.97785 0.02190 0.01300 2.26260 2.27560 0.01217 0.57378 0.58595 — 2,230.81 2,230.81 0.08298 0.08800 5.02019 2,264.13Area 0.15353 0.15353 ————————————————Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.310 412.310 0.04275 0.00299 — 414.270Water — — — — — — — — — — — 3.91154 9.59421 13.5058 0.40230 0.00968 — 26.4469Waste — — — — — — — — — — — 10.8057 0.00000 10.8057 1.07999 0.00000 — 37.8053Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.30235 1.20539 0.98270 8.15228 0.02314 0.02878 2.26260 2.29138 0.02796 0.57378 0.60173 14.7172 2,652.71 2,667.43 1.60802 0.10067 15.5331 2,753.16Daily,Winter(Max) ——————————————————
Mobile 1.11906 1.03119 0.86550 7.79623 0.02114 0.01300 2.26260 2.27561 0.01218 0.57378 0.58596 — 2,154.14 2,154.14 0.08917 0.09394 0.13017 2,184.49Area 0.15353 0.15353 ————————————————Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.176 412.176 0.04273 0.00299 — 414.134Water — — — — — — — — — — — 3.91154 9.59421 13.5058 0.40230 0.00968 — 26.4469Waste — — — — — — — — — — — 10.8057 0.00000 10.8057 1.07999 0.00000 — 37.8053Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.29543 1.19614 1.07316 7.97066 0.02239 0.02878 2.26260 2.29139 0.02796 0.57378 0.60174 14.7172 2,575.91 2,590.62 1.61418 0.10661 10.6431 2,673.39AverageDaily ——————————————————
Mobile 1.10924 1.02235 0.84782 7.68881 0.02126 0.01300 2.22974 2.24274 0.01218 0.56556 0.57774 — 2,166.11 2,166.11 0.08675 0.09249 2.16768 2,198.01Area 0.15353 0.15353 ————————————————Energy 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 412.242 412.242 0.04274 0.00299 — 414.201Water — — — — — — — — — — — 3.91154 9.59421 13.5058 0.40230 0.00968 — 26.4469Waste — — — — — — — — — — — 10.8057 0.00000 10.8057 1.07999 0.00000 — 37.8053Refrig. — — — — — — — — — — — — — — — — 10.5129 10.5129Total 1.28561 1.18731 1.05548 7.86324 0.02250 0.02878 2.22974 2.25852 0.02796 0.56556 0.59352 14.7172 2,587.95 2,602.66 1.61177 0.10515 12.6806 2,686.98Annual — — — — — — — — — — — — — — — — — — Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 23 / 91
Mobile 0.20244 0.18658 0.15473 1.40321 0.00388 0.00237 0.40693 0.40930 0.00222 0.10322 0.10544 — 358.624 358.624 0.01436 0.01531 0.35888 363.905 Area 0.02802 0.02802 ————————————————Energy 0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 68.2514 68.2514 0.00708 0.00049 — 68.5758Water — — — — — — — — — — — 0.64760 1.58843 2.23603 0.06661 0.00160 — 4.37858Waste — — — — — — — — — — — 1.78900 0.00000 1.78900 0.17880 0.00000 — 6.25910Refrig. — — — — — — — — — — — — — — — — 1.74053 1.74053Total 0.23462 0.21668 0.19262 1.43504 0.00411 0.00525 0.40693 0.41218 0.00510 0.10322 0.10832 2.43660 428.464 430.901 0.26685 0.01741 2.09941 444.859
3. Construction Emissions Details3.1. Grading (2028)3.1.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23093 0.23093 1.20083 14.2408 0.02268 0.04619 — 0.04619 0.04619 — 0.04619 — 2,456.26 2,456.26 0.09964 0.01993 — 2,464.69 DustFromMaterialMovement
— — — — — — 7.08331 7.08331 — 3.42485 3.42485 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 24 / 91
Off-RoaEquipment
0.04158 0.04158 0.21620 2.56390 0.00408 0.00832 — 0.00832 0.00832 — 0.00832 — 442.224 442.224 0.01794 0.00359 — 443.741 DustFromMaterialMovement
— — — — — — 1.27527 1.27527 — 0.61661 0.61661 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00759 0.00759 0.03946 0.46791 0.00075 0.00152 — 0.00152 0.00152 — 0.00152 — 73.2152 73.2152 0.00297 0.00059 — 73.4664 DustFromMaterialMovement
— — — — — — 0.23274 0.23274 — 0.11253 0.11253 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.03858 0.03770 0.03990 0.46518 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 120.855 120.855 0.00198 0.00496 0.01044 122.394Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00418 0.00159 0.13158 0.03357 0.00073 0.00138 0.02838 0.02977 0.00138 0.00796 0.00934 — 101.384 101.384 0.00183 0.01632 0.00508 106.298AverageDaily ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 25 / 91
Worker 0.00695 0.00683 0.00710 0.08413 0.00000 0.00000 0.02319 0.02319 0.00000 0.00543 0.00543 — 21.9169 21.9169 0.00032 0.00085 0.03129 22.2105 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00077 0.00030 0.02370 0.00599 0.00013 0.00025 0.00505 0.00530 0.00025 0.00142 0.00167 — 18.2494 18.2494 0.00033 0.00294 0.01524 19.1483Annual — — — — — — — — — — — — — — — — — —Worker 0.00127 0.00125 0.00130 0.01535 0.00000 0.00000 0.00423 0.00423 0.00000 0.00099 0.00099 — 3.62860 3.62860 0.00005 0.00014 0.00518 3.67719Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00014 0.00005 0.00433 0.00109 0.00002 0.00005 0.00092 0.00097 0.00005 0.00026 0.00030 — 3.02139 3.02139 0.00005 0.00049 0.00252 3.17023
3.1.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23093 0.23093 1.20083 14.2408 0.02268 0.04619 — 0.04619 0.04619 — 0.04619 — 2,456.26 2,456.26 0.09964 0.01993 — 2,464.69 DustFromMaterialMovement
— — — — — — 2.76249 2.76249 — 1.33569 1.33569 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04158 0.04158 0.21620 2.56390 0.00408 0.00832 — 0.00832 0.00832 — 0.00832 — 442.224 442.224 0.01794 0.00359 — 443.741 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 26 / 91
—
—
—
—
—
—
— 0.24048 0.24048
— 0.49736 0.49736
—
—
—
—
—
— Dust
FromMaterialMovement
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00759 0.00759 0.03946 0.46791 0.00075 0.00152 — 0.00152 0.00152 — 0.00152 — 73.2152 73.2152 0.00297 0.00059 — 73.4664 DustFromMaterialMovement
— — — — — — 0.09077 0.09077 — 0.04389 0.04389 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.03858 0.03770 0.03990 0.46518 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 120.855 120.855 0.00198 0.00496 0.01044 122.394Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00418 0.00159 0.13158 0.03357 0.00073 0.00138 0.02838 0.02977 0.00138 0.00796 0.00934 — 101.384 101.384 0.00183 0.01632 0.00508 106.298AverageDaily ——————————————————
Worker 0.00695 0.00683 0.00710 0.08413 0.00000 0.00000 0.02319 0.02319 0.00000 0.00543 0.00543 — 21.9169 21.9169 0.00032 0.00085 0.03129 22.2105Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 27 / 91
Hauling 0.00077 0.00030 0.02370 0.00599 0.00013 0.00025 0.00505 0.00530 0.00025 0.00142 0.00167 — 18.2494 18.2494 0.00033 0.00294 0.01524 19.1483 Annual — — — — — — — — — — — — — — — — — —Worker 0.00127 0.00125 0.00130 0.01535 0.00000 0.00000 0.00423 0.00423 0.00000 0.00099 0.00099 — 3.62860 3.62860 0.00005 0.00014 0.00518 3.67719Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00014 0.00005 0.00433 0.00109 0.00002 0.00005 0.00092 0.00097 0.00005 0.00026 0.00030 — 3.02139 3.02139 0.00005 0.00049 0.00252 3.17023
3.2. Grading (2029)3.2.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23093 0.23093 1.20083 14.2408 0.02266 0.04619 — 0.04619 0.04619 — 0.04619 — 2,454.55 2,454.55 0.09957 0.01991 — 2,462.97 DustFromMaterialMovement
— — — — — — 7.08331 7.08331 — 3.42485 3.42485 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.01401 0.01401 0.07285 0.86392 0.00137 0.00280 — 0.00280 0.00280 — 0.00280 — 148.906 148.906 0.00604 0.00121 — 149.417 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 28 / 91
—
—
—
—
—
—
— 0.20777 0.20777
— 0.42971 0.42971
—
—
—
—
—
— Dust
FromMaterialMovement
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00256 0.00256 0.01329 0.15767 0.00025 0.00051 — 0.00051 0.00051 — 0.00051 — 24.6531 24.6531 0.00100 0.00020 — 24.7377 DustFromMaterialMovement
— — — — — — 0.07842 0.07842 — 0.03792 0.03792 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.03748 0.03252 0.03968 0.43497 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 118.756 118.756 0.00176 0.00496 0.00939 120.288Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00418 0.00159 0.12571 0.03295 0.00073 0.00138 0.02838 0.02977 0.00138 0.00796 0.00934 — 98.5933 98.5933 0.00180 0.01559 0.00466 103.289AverageDaily ——————————————————
Worker 0.00225 0.00195 0.00213 0.02655 0.00000 0.00000 0.00781 0.00781 0.00000 0.00183 0.00183 — 7.25677 7.25677 0.00011 0.00029 0.00948 7.35462Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 29 / 91
Hauling 0.00026 0.00010 0.00763 0.00198 0.00004 0.00008 0.00170 0.00179 0.00008 0.00048 0.00056 — 5.97988 5.97988 0.00011 0.00095 0.00470 6.26919 Annual — — — — — — — — — — — — — — — — — —Worker 0.00041 0.00036 0.00039 0.00485 0.00000 0.00000 0.00143 0.00143 0.00000 0.00033 0.00033 — 1.20144 1.20144 0.00002 0.00005 0.00157 1.21764Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00005 0.00002 0.00139 0.00036 0.00001 0.00002 0.00031 0.00033 0.00002 0.00009 0.00010 — 0.99004 0.99004 0.00002 0.00016 0.00078 1.03794
3.2.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23093 0.23093 1.20083 14.2408 0.02266 0.04619 — 0.04619 0.04619 — 0.04619 — 2,454.55 2,454.55 0.09957 0.01991 — 2,462.97 DustFromMaterialMovement
— — — — — — 2.76249 2.76249 — 1.33569 1.33569 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.01401 0.01401 0.07285 0.86392 0.00137 0.00280 — 0.00280 0.00280 — 0.00280 — 148.906 148.906 0.00604 0.00121 — 149.417 DustFromMaterialMovement
— — — — — — 0.16759 0.16759 — 0.08103 0.08103 ———————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 30 / 91
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00256 0.00256 0.01329 0.15767 0.00025 0.00051 — 0.00051 0.00051 — 0.00051 — 24.6531 24.6531 0.00100 0.00020 — 24.7377 DustFromMaterialMovement
— — — — — — 0.03058 0.03058 — 0.01479 0.01479 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.03748 0.03252 0.03968 0.43497 0.00000 0.00000 0.13071 0.13071 0.00000 0.03064 0.03064 — 118.756 118.756 0.00176 0.00496 0.00939 120.288Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00418 0.00159 0.12571 0.03295 0.00073 0.00138 0.02838 0.02977 0.00138 0.00796 0.00934 — 98.5933 98.5933 0.00180 0.01559 0.00466 103.289AverageDaily ——————————————————
Worker 0.00225 0.00195 0.00213 0.02655 0.00000 0.00000 0.00781 0.00781 0.00000 0.00183 0.00183 — 7.25677 7.25677 0.00011 0.00029 0.00948 7.35462Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00026 0.00010 0.00763 0.00198 0.00004 0.00008 0.00170 0.00179 0.00008 0.00048 0.00056 — 5.97988 5.97988 0.00011 0.00095 0.00470 6.26919Annual — — — — — — — — — — — — — — — — — —Worker 0.00041 0.00036 0.00039 0.00485 0.00000 0.00000 0.00143 0.00143 0.00000 0.00033 0.00033 — 1.20144 1.20144 0.00002 0.00005 0.00157 1.21764 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 31 / 91
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00005 0.00002 0.00139 0.00036 0.00001 0.00002 0.00031 0.00033 0.00002 0.00009 0.00010 — 0.99004 0.99004 0.00002 0.00016 0.00078 1.03794
3.3. Building Construction (2029)3.3.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 — 0.11706 0.10993 — 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 — 0.11706 0.10993 — 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.50507 0.43327 3.35706 8.90256 0.01511 0.07651 — 0.07651 0.07185 — 0.07185 — 1,438.65 1,438.65 0.05836 0.01167 — 1,443.58 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 32 / 91
Off-RoaEquipment
0.09218 0.07907 0.61266 1.62472 0.00276 0.01396 — 0.01396 0.01311 — 0.01311 — 238.184 238.184 0.00966 0.00193 — 239.002 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.01065 0.01046 0.00859 0.13662 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 35.0886 35.0886 0.00044 0.00134 0.10230 35.6007Vendor 0.00142 0.00071 0.03446 0.01129 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 31.0877 31.0877 0.00039 0.00463 0.05990 32.5376Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01059 0.00918 0.01121 0.12286 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 33.5427 33.5427 0.00050 0.00140 0.00265 33.9753Vendor 0.00138 0.00069 0.03592 0.01163 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 31.1056 31.1056 0.00039 0.00463 0.00155 32.4972Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00684 0.00592 0.00649 0.08081 0.00000 0.00000 0.02378 0.02378 0.00000 0.00557 0.00557 — 22.0836 22.0836 0.00033 0.00088 0.02886 22.3814Vendor 0.00091 0.00045 0.02330 0.00747 0.00016 0.00016 0.00609 0.00625 0.00016 0.00168 0.00185 — 20.3245 20.3245 0.00026 0.00303 0.01687 21.2499Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00125 0.00108 0.00118 0.01475 0.00000 0.00000 0.00434 0.00434 0.00000 0.00102 0.00102 — 3.65619 3.65619 0.00005 0.00014 0.00478 3.70549Vendor 0.00017 0.00008 0.00425 0.00136 0.00003 0.00003 0.00111 0.00114 0.00003 0.00031 0.00034 — 3.36495 3.36495 0.00004 0.00050 0.00279 3.51816Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 33 / 91
3.3.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 — 0.11706 0.10993 — 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.77273 0.66287 5.13610 13.6204 0.02312 0.11706 — 0.11706 0.10993 — 0.10993 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.50507 0.43327 3.35706 8.90256 0.01511 0.07651 — 0.07651 0.07185 — 0.07185 — 1,438.65 1,438.65 0.05836 0.01167 — 1,443.58 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.09218 0.07907 0.61266 1.62472 0.00276 0.01396 — 0.01396 0.01311 — 0.01311 — 238.184 238.184 0.00966 0.00193 — 239.002 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 34 / 91
3.3.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.01065 0.01046 0.00859 0.13662 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 35.0886 35.0886 0.00044 0.00134 0.10230 35.6007Vendor 0.00142 0.00071 0.03446 0.01129 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 31.0877 31.0877 0.00039 0.00463 0.05990 32.5376Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01059 0.00918 0.01121 0.12286 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 33.5427 33.5427 0.00050 0.00140 0.00265 33.9753Vendor 0.00138 0.00069 0.03592 0.01163 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 31.1056 31.1056 0.00039 0.00463 0.00155 32.4972Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00684 0.00592 0.00649 0.08081 0.00000 0.00000 0.02378 0.02378 0.00000 0.00557 0.00557 — 22.0836 22.0836 0.00033 0.00088 0.02886 22.3814Vendor 0.00091 0.00045 0.02330 0.00747 0.00016 0.00016 0.00609 0.00625 0.00016 0.00168 0.00185 — 20.3245 20.3245 0.00026 0.00303 0.01687 21.2499Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00125 0.00108 0.00118 0.01475 0.00000 0.00000 0.00434 0.00434 0.00000 0.00102 0.00102 — 3.65619 3.65619 0.00005 0.00014 0.00478 3.70549Vendor 0.00017 0.00008 0.00425 0.00136 0.00003 0.00003 0.00111 0.00114 0.00003 0.00031 0.00034 — 3.36495 3.36495 0.00004 0.00050 0.00279 3.51816Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Building Construction (2030)3.4.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 35 / 91
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 — 0.10814 0.10173 — 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 — 0.10814 0.10173 — 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.53600 0.46029 3.63640 9.71301 0.01651 0.07724 — 0.07724 0.07266 — 0.07266 — 1,572.17 1,572.17 0.06377 0.01275 — 1,577.57 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.09782 0.08400 0.66364 1.77262 0.00301 0.01410 — 0.01410 0.01326 — 0.01326 — 260.291 260.291 0.01056 0.00211 — 261.185 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 36 / 91
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Worker 0.01021 0.00887 0.00853 0.12859 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 34.4991 34.4991 0.00044 0.00134 0.09126 35.0002Vendor 0.00113 0.00071 0.03276 0.01099 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 30.1290 30.1290 0.00039 0.00438 0.05246 31.4977Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01015 0.00875 0.00993 0.11554 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 32.9812 32.9812 0.00050 0.00134 0.00237 33.3950Vendor 0.00110 0.00066 0.03399 0.01136 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 30.1480 30.1480 0.00039 0.00438 0.00136 31.4655Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00716 0.00616 0.00701 0.08317 0.00000 0.00000 0.02599 0.02599 0.00000 0.00609 0.00609 — 23.7291 23.7291 0.00031 0.00096 0.02812 24.0500Vendor 0.00082 0.00049 0.02426 0.00797 0.00018 0.00018 0.00665 0.00683 0.00018 0.00184 0.00202 — 21.5264 21.5264 0.00028 0.00313 0.01620 22.4828Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00131 0.00112 0.00128 0.01518 0.00000 0.00000 0.00474 0.00474 0.00000 0.00111 0.00111 — 3.92863 3.92863 0.00005 0.00016 0.00466 3.98175Vendor 0.00015 0.00009 0.00443 0.00146 0.00003 0.00003 0.00121 0.00125 0.00003 0.00034 0.00037 — 3.56395 3.56395 0.00005 0.00052 0.00268 3.72228Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 37 / 91
2,208.60
— 0.01786 0.08928 2,201.04 2,201.04
— 0.10173
— 0.10173 0.10814
— 0.10814 0.02312 13.5982 5.09096 0.64441 0.75040 Off-Roa dEquipm
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.75040 0.64441 5.09096 13.5982 0.02312 0.10814 — 0.10814 0.10173 — 0.10173 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.53600 0.46029 3.63640 9.71301 0.01651 0.07724 — 0.07724 0.07266 — 0.07266 — 1,572.17 1,572.17 0.06377 0.01275 — 1,577.57 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.09782 0.08400 0.66364 1.77262 0.00301 0.01410 — 0.01410 0.01326 — 0.01326 — 260.291 260.291 0.01056 0.00211 — 261.185 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 38 / 91
Worker 0.01021 0.00887 0.00853 0.12859 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 34.4991 34.4991 0.00044 0.00134 0.09126 35.0002 Vendor 0.00113 0.00071 0.03276 0.01099 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 30.1290 30.1290 0.00039 0.00438 0.05246 31.4977Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01015 0.00875 0.00993 0.11554 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 32.9812 32.9812 0.00050 0.00134 0.00237 33.3950Vendor 0.00110 0.00066 0.03399 0.01136 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 30.1480 30.1480 0.00039 0.00438 0.00136 31.4655Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00716 0.00616 0.00701 0.08317 0.00000 0.00000 0.02599 0.02599 0.00000 0.00609 0.00609 — 23.7291 23.7291 0.00031 0.00096 0.02812 24.0500Vendor 0.00082 0.00049 0.02426 0.00797 0.00018 0.00018 0.00665 0.00683 0.00018 0.00184 0.00202 — 21.5264 21.5264 0.00028 0.00313 0.01620 22.4828Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00131 0.00112 0.00128 0.01518 0.00000 0.00000 0.00474 0.00474 0.00000 0.00111 0.00111 — 3.92863 3.92863 0.00005 0.00016 0.00466 3.98175Vendor 0.00015 0.00009 0.00443 0.00146 0.00003 0.00003 0.00121 0.00125 0.00003 0.00034 0.00037 — 3.56395 3.56395 0.00005 0.00052 0.00268 3.72228Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5. Building Construction (2031)3.5.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.73351 0.63045 5.05339 13.5816 0.02312 0.10074 — 0.10074 0.09491 — 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 39 / 91
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.73351 0.63045 5.05339 13.5816 0.02312 0.10074 — 0.10074 0.09491 — 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.39187 0.33682 2.69975 7.25591 0.01235 0.05382 — 0.05382 0.05071 — 0.05071 — 1,175.90 1,175.90 0.04770 0.00954 — 1,179.94 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.07152 0.06147 0.49271 1.32420 0.00225 0.00982 — 0.00982 0.00925 — 0.00925 — 194.684 194.684 0.00790 0.00158 — 195.352 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.00971 0.00844 0.00725 0.11940 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 33.9525 33.9525 0.00037 0.00019 0.08105 34.0986Vendor 0.00113 0.00071 0.03130 0.01072 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 29.1263 29.1263 0.00039 0.00438 0.04572 30.4882 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 40 / 91
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Worker 0.00971 0.00838 0.00872 0.10822 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 32.4604 32.4604 0.00044 0.00134 0.00211 32.8724Vendor 0.00108 0.00066 0.03258 0.01109 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 29.1462 29.1462 0.00039 0.00438 0.00118 30.4635Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00516 0.00444 0.00459 0.05779 0.00000 0.00000 0.01944 0.01944 0.00000 0.00455 0.00455 — 17.4675 17.4675 0.00023 0.00072 0.01875 17.7053Vendor 0.00059 0.00037 0.01724 0.00582 0.00013 0.00013 0.00498 0.00511 0.00013 0.00138 0.00151 — 15.5651 15.5651 0.00021 0.00234 0.01051 16.2788Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00094 0.00081 0.00084 0.01055 0.00000 0.00000 0.00355 0.00355 0.00000 0.00083 0.00083 — 2.89195 2.89195 0.00004 0.00012 0.00310 2.93131Vendor 0.00011 0.00007 0.00315 0.00106 0.00002 0.00002 0.00091 0.00093 0.00002 0.00025 0.00028 — 2.57698 2.57698 0.00003 0.00039 0.00174 2.69514Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.73351 0.63045 5.05339 13.5816 0.02312 0.10074 — 0.10074 0.09491 — 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 41 / 91
Off-RoaEquipment
0.73351 0.63045 5.05339 13.5816 0.02312 0.10074 — 0.10074 0.09491 — 0.09491 — 2,201.04 2,201.04 0.08928 0.01786 — 2,208.60 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.39187 0.33682 2.69975 7.25591 0.01235 0.05382 — 0.05382 0.05071 — 0.05071 — 1,175.90 1,175.90 0.04770 0.00954 — 1,179.94 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.07152 0.06147 0.49271 1.32420 0.00225 0.00982 — 0.00982 0.00925 — 0.00925 — 194.684 194.684 0.00790 0.00158 — 195.352 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.00971 0.00844 0.00725 0.11940 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 33.9525 33.9525 0.00037 0.00019 0.08105 34.0986Vendor 0.00113 0.00071 0.03130 0.01072 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 29.1263 29.1263 0.00039 0.00438 0.04572 30.4882Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.00971 0.00838 0.00872 0.10822 0.00000 0.00000 0.03692 0.03692 0.00000 0.00865 0.00865 — 32.4604 32.4604 0.00044 0.00134 0.00211 32.8724Vendor 0.00108 0.00066 0.03258 0.01109 0.00025 0.00025 0.00943 0.00968 0.00025 0.00261 0.00285 — 29.1462 29.1462 0.00039 0.00438 0.00118 30.4635 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 42 / 91
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Worker 0.00516 0.00444 0.00459 0.05779 0.00000 0.00000 0.01944 0.01944 0.00000 0.00455 0.00455 — 17.4675 17.4675 0.00023 0.00072 0.01875 17.7053Vendor 0.00059 0.00037 0.01724 0.00582 0.00013 0.00013 0.00498 0.00511 0.00013 0.00138 0.00151 — 15.5651 15.5651 0.00021 0.00234 0.01051 16.2788Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00094 0.00081 0.00084 0.01055 0.00000 0.00000 0.00355 0.00355 0.00000 0.00083 0.00083 — 2.89195 2.89195 0.00004 0.00012 0.00310 2.93131Vendor 0.00011 0.00007 0.00315 0.00106 0.00002 0.00002 0.00091 0.00093 0.00002 0.00025 0.00028 — 2.57698 2.57698 0.00003 0.00039 0.00174 2.69514Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6. Paving (2031)3.6.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.40722 0.35495 2.52114 8.60839 0.01181 0.08675 — 0.08675 0.08118 — 0.08118 — 1,243.41 1,243.41 0.05044 0.01009 — 1,247.67 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.40722 0.35495 2.52114 8.60839 0.01181 0.08675 — 0.08675 0.08118 — 0.08118 — 1,243.41 1,243.41 0.05044 0.01009 — 1,247.67 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 43 / 91
Paving 0.00000 0.00000 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.09930 0.08655 0.61474 2.09903 0.00288 0.02115 — 0.02115 0.01980 — 0.01980 — 303.187 303.187 0.01230 0.00246 — 304.227 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01812 0.01580 0.11219 0.38307 0.00053 0.00386 — 0.00386 0.00361 — 0.00361 — 50.1960 50.1960 0.00204 0.00041 — 50.3683 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.05159 0.04481 0.03853 0.63410 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 180.311 180.311 0.00198 0.00099 0.43043 181.087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 44 / 91
Worker 0.05159 0.04448 0.04630 0.57475 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 172.387 172.387 0.00231 0.00711 0.01120 174.574 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01250 0.01076 0.01113 0.14006 0.00000 0.00000 0.04711 0.04711 0.00000 0.01103 0.01103 — 42.3386 42.3386 0.00056 0.00173 0.04544 42.9148Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00228 0.00196 0.00203 0.02556 0.00000 0.00000 0.00860 0.00860 0.00000 0.00201 0.00201 — 7.00965 7.00965 0.00009 0.00029 0.00752 7.10504Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.40722 0.35495 2.52114 8.60839 0.01181 0.08675 — 0.08675 0.08118 — 0.08118 — 1,243.41 1,243.41 0.05044 0.01009 — 1,247.67 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.40722 0.35495 2.52114 8.60839 0.01181 0.08675 — 0.08675 0.08118 — 0.08118 — 1,243.41 1,243.41 0.05044 0.01009 — 1,247.67 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 45 / 91
Paving 0.00000 0.00000 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.09930 0.08655 0.61474 2.09903 0.00288 0.02115 — 0.02115 0.01980 — 0.01980 — 303.187 303.187 0.01230 0.00246 — 304.227 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01812 0.01580 0.11219 0.38307 0.00053 0.00386 — 0.00386 0.00361 — 0.00361 — 50.1960 50.1960 0.00204 0.00041 — 50.3683 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.05159 0.04481 0.03853 0.63410 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 180.311 180.311 0.00198 0.00099 0.43043 181.087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 46 / 91
Worker 0.05159 0.04448 0.04630 0.57475 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 172.387 172.387 0.00231 0.00711 0.01120 174.574 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01250 0.01076 0.01113 0.14006 0.00000 0.00000 0.04711 0.04711 0.00000 0.01103 0.01103 — 42.3386 42.3386 0.00056 0.00173 0.04544 42.9148Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00228 0.00196 0.00203 0.02556 0.00000 0.00000 0.00860 0.00860 0.00000 0.00201 0.00201 — 7.00965 7.00965 0.00009 0.00029 0.00752 7.10504Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7. Architectural Coating (2031)3.7.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
0.23801 0.23801 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 47 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Winter(Max)
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
0.23801 0.23801 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04143 0.03424 0.27883 0.39604 0.00062 0.00338 — 0.00338 0.00311 — 0.00311 — 47.9200 47.9200 0.00194 0.00039 — 48.0845 ArchitecturalCoatings
0.08542 0.08542 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00756 0.00625 0.05089 0.07228 0.00011 0.00062 — 0.00062 0.00057 — 0.00057 — 7.93371 7.93371 0.00032 0.00006 — 7.96093 ArchitecturalCoatings
0.01559 0.01559 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 48 / 91
3.7.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.00194 0.00169 0.00145 0.02388 0.00000 0.00000 0.00738 0.00738 0.00000 0.00173 0.00173 — 6.79051 6.79051 0.00007 0.00004 0.01621 6.81972Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.00194 0.00168 0.00174 0.02164 0.00000 0.00000 0.00738 0.00738 0.00000 0.00173 0.00173 — 6.49208 6.49208 0.00009 0.00027 0.00042 6.57448Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00069 0.00060 0.00062 0.00776 0.00000 0.00000 0.00261 0.00261 0.00000 0.00061 0.00061 — 2.34692 2.34692 0.00003 0.00010 0.00252 2.37886Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00013 0.00011 0.00011 0.00142 0.00000 0.00000 0.00048 0.00048 0.00000 0.00011 0.00011 — 0.38856 0.38856 0.00001 0.00002 0.00042 0.39385Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 49 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
0.23801 0.23801 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
0.23801 0.23801 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04143 0.03424 0.27883 0.39604 0.00062 0.00338 — 0.00338 0.00311 — 0.00311 — 47.9200 47.9200 0.00194 0.00039 — 48.0845 ArchitecturalCoatings
0.08542 0.08542 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 50 / 91
Annual — — — — — — — — — — — — — — — — — —
Off-RoadEquipment
0.00756 0.00625 0.05089 0.07228 0.00011 0.00062 — 0.00062 0.00057 — 0.00057 — 7.93371 7.93371 0.00032 0.00006 — 7.96093 ArchitecturalCoatings
0.01559 0.01559 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.00194 0.00169 0.00145 0.02388 0.00000 0.00000 0.00738 0.00738 0.00000 0.00173 0.00173 — 6.79051 6.79051 0.00007 0.00004 0.01621 6.81972Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.00194 0.00168 0.00174 0.02164 0.00000 0.00000 0.00738 0.00738 0.00000 0.00173 0.00173 — 6.49208 6.49208 0.00009 0.00027 0.00042 6.57448Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00069 0.00060 0.00062 0.00776 0.00000 0.00000 0.00261 0.00261 0.00000 0.00061 0.00061 — 2.34692 2.34692 0.00003 0.00010 0.00252 2.37886Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — — Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 51 / 91
Worker 0.00013 0.00011 0.00011 0.00142 0.00000 0.00000 0.00048 0.00048 0.00000 0.00011 0.00011 — 0.38856 0.38856 0.00001 0.00002 0.00042 0.39385 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details4.1. Mobile Emissions by Land Use4.1.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
1.26444 1.16837 0.87034 8.95884 0.02459 0.01459 2.54082 2.55542 0.01367 0.64433 0.65800 — 2,505.12 2,505.12 0.09319 0.09882 5.63750 2,542.53 CityPark
0.00594 0.00549 0.00409 0.04208 0.00012 0.00007 0.01193 0.01200 0.00006 0.00303 0.00309 — 11.7670 11.7670 0.00044 0.00046 0.02648 11.9427 Total 1.27038 1.17386 0.87443 9.00092 0.02471 0.01466 2.55276 2.56742 0.01374 0.64736 0.66109 — 2,516.88 2,516.88 0.09362 0.09929 5.66398 2,554.48Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
1.25666 1.15799 0.97193 8.75489 0.02374 0.01460 2.54082 2.55542 0.01368 0.64433 0.65801 — 2,419.02 2,419.02 0.10013 0.10550 0.14618 2,453.10 CityPark
0.00590 0.00544 0.00457 0.04112 0.00011 0.00007 0.01193 0.01200 0.00006 0.00303 0.00309 — 11.3626 11.3626 0.00047 0.00050 0.00069 11.5227 Total 1.26256 1.16343 0.97649 8.79601 0.02385 0.01467 2.55276 2.56743 0.01374 0.64736 0.66110 — 2,430.38 2,430.38 0.10060 0.10599 0.14686 2,464.63 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 52 / 91
Annual — — — — — — — — — — — — — — — — — —
HighTurnover(SitDownRestaurant)
0.22733 0.20952 0.17375 1.57575 0.00436 0.00266 0.45697 0.45963 0.00250 0.11591 0.11840 — 402.722 402.722 0.01613 0.01719 0.40301 408.653 CityPark
0.00107 0.00098 0.00082 0.00740 0.00002 0.00001 0.00215 0.00216 0.00001 0.00054 0.00056 — 1.89166 1.89166 0.00008 0.00008 0.00189 1.91952 Total 0.22840 0.21051 0.17457 1.58315 0.00438 0.00268 0.45911 0.46179 0.00251 0.11645 0.11896 — 404.614 404.614 0.01620 0.01728 0.40491 410.572
4.1.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
1.12030 1.03519 0.77113 7.93762 0.02179 0.01293 2.25119 2.26412 0.01211 0.57088 0.58300 — 2,219.56 2,219.56 0.08256 0.08756 4.99488 2,252.71 CityPark
0.00568 0.00525 0.00391 0.04023 0.00011 0.00007 0.01141 0.01148 0.00006 0.00289 0.00295 — 11.2492 11.2492 0.00042 0.00044 0.02532 11.4173 Total 1.12598 1.04044 0.77504 7.97785 0.02190 0.01300 2.26260 2.27560 0.01217 0.57378 0.58595 — 2,230.81 2,230.81 0.08298 0.08800 5.02019 2,264.13Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
1.11341 1.02599 0.86114 7.75692 0.02103 0.01294 2.25119 2.26413 0.01212 0.57088 0.58300 — 2,143.27 2,143.27 0.08872 0.09347 0.12951 2,173.48 CityPark
0.00564 0.00520 0.00436 0.03931 0.00011 0.00007 0.01141 0.01148 0.00006 0.00289 0.00295 — 10.8626 10.8626 0.00045 0.00047 0.00066 11.0157 Total 1.11906 1.03119 0.86550 7.79623 0.02114 0.01300 2.26260 2.27561 0.01218 0.57378 0.58596 — 2,154.14 2,154.14 0.08917 0.09394 0.13017 2,184.49 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 53 / 91
Annual — — — — — — — — — — — — — — — — — —
HighTurnover(SitDownRestaurant)
0.20142 0.18564 0.15395 1.39613 0.00386 0.00236 0.40488 0.40724 0.00221 0.10269 0.10491 — 356.816 356.816 0.01429 0.01523 0.35707 362.070 CityPark
0.00102 0.00094 0.00078 0.00708 0.00002 0.00001 0.00205 0.00206 0.00001 0.00052 0.00053 — 1.80843 1.80843 0.00007 0.00008 0.00181 1.83506 Total 0.20244 0.18658 0.15473 1.40321 0.00388 0.00237 0.40693 0.40930 0.00222 0.10322 0.10544 — 358.624 358.624 0.01436 0.01531 0.35888 363.905
4.2. Energy4.2.1. Electricity Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681 CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 54 / 91
CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — — 27.2199 27.2199 0.00344 0.00042 — 27.4304 CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 27.2199 27.2199 0.00344 0.00042 — 27.4304
4.2.2. Electricity Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 164.544 164.544 0.02082 0.00252 — 165.817 CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 164.544 164.544 0.02082 0.00252 — 165.817Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 55 / 91
CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 164.409 164.409 0.02080 0.00252 — 165.681Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — — 27.2309 27.2309 0.00345 0.00042 — 27.4415 CityPark
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 27.2309 27.2309 0.00345 0.00042 — 27.4415
4.2.3. Natural Gas Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453 CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 56 / 91
CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant)
0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 41.0205 41.0205 0.00363 0.00008 — 41.1343 CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 41.0205 41.0205 0.00363 0.00008 — 41.1343
4.2.4. Natural Gas Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453 CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 57 / 91
CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.02284 0.01142 0.20765 0.17443 0.00125 0.01578 — 0.01578 0.01578 — 0.01578 — 247.766 247.766 0.02193 0.00047 — 248.453Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant)
0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 41.0205 41.0205 0.00363 0.00008 — 41.1343 CityPark
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.00417 0.00208 0.03790 0.03183 0.00023 0.00288 — 0.00288 0.00288 — 0.00288 — 41.0205 41.0205 0.00363 0.00008 — 41.1343
4.3. Area Emissions by Source4.3.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
ConsumerProducts
0.15182 0.15182 ————————————————
ArchitecturalCoatings
0.00854 0.00854 ————————————————
LandscapeEquipment
0.05208 0.04807 0.00246 0.29249 0.00002 0.00052 — 0.00052 0.00039 — 0.00039 — 1.20274 1.20274 0.00005 0.00001 — 1.20708 Total 0.21245 0.20843 0.00246 0.29249 0.00002 0.00052 — 0.00052 0.00039 — 0.00039 — 1.20274 1.20274 0.00005 0.00001 — 1.20708 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 58 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Winter(Max)
ConsumerProducts
0.15182 0.15182 ————————————————
ArchitecturalCoatings
0.00854 0.00854 ————————————————
Total 0.16037 0.16037 ————————————————Annual — — — — — — — — — — — — — — — — — —ConsumerProducts
0.02771 0.02771 ————————————————
ArchitecturalCoatings
0.00156 0.00156 ————————————————
LandscapeEquipment
0.00469 0.00433 0.00022 0.02632 <
0.000005
0.00005 — 0.00005 0.00004 — 0.00004 — 0.09820 0.09820 <
0.000005
<0.000005
— 0.09855
Total 0.03395 0.03359 0.00022 0.02632 <
0.000005
0.00005 — 0.00005 0.00004 — 0.00004 — 0.09820 0.09820 <
0.000005
<0.000005
— 0.09855
4.3.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 59 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— 0.15182 0.15182 Consum
erProduct
ArchitecturalCoatings
0.00171 0.00171 ————————————————
Total 0.15353 0.15353 ————————————————Daily,Winter(Max) ——————————————————
ConsumerProducts
0.15182 0.15182 ————————————————
ArchitecturalCoatings
0.00171 0.00171 ————————————————
Total 0.15353 0.15353 ————————————————Annual — — — — — — — — — — — — — — — — — —ConsumerProducts
0.02771 0.02771 ————————————————
ArchitecturalCoatings
0.00031 0.00031 ————————————————
Total 0.02802 0.02802 ————————————————
4.4. Water Emissions by Land Use4.4.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 60 / 91
LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 3.91154 9.97722 13.8888 0.40235 0.00968 — 26.8329 CityPark
— — — — — — — — — — — 0.00000 1.51570 1.51570 0.00019 0.00002 — 1.52742 Total — — — — — — — — — — — 3.91154 11.4929 15.4045 0.40254 0.00971 — 28.3603Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 3.91154 9.97722 13.8888 0.40235 0.00968 — 26.8329 CityPark
— — — — — — — — — — — 0.00000 1.51570 1.51570 0.00019 0.00002 — 1.52742 Total — — — — — — — — — — — 3.91154 11.4929 15.4045 0.40254 0.00971 — 28.3603Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — 0.64760 1.65184 2.29944 0.06661 0.00160 — 4.44249 CityPark
— — — — — — — — — — — 0.00000 0.25094 0.25094 0.00003 <
0.000005
— 0.25288
Total — — — — — — — — — — — 0.64760 1.90278 2.55038 0.06664 0.00161 — 4.69537
4.4.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 61 / 91
LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 3.91154 9.94892 13.8605 0.40234 0.00968 — 26.8043 CityPark
— — — — — — — — — — — 0.00000 -0.35471 -0.35471 -0.00004 -0.00001 — -0.3574 6 Total — — — — — — — — — — — 3.91154 9.59421 13.5058 0.40230 0.00968 — 26.4469Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 3.91154 9.94892 13.8605 0.40234 0.00968 — 26.8043 CityPark
— — — — — — — — — — — 0.00000 -0.35471 -0.35471 -0.00004 -0.00001 — -0.3574 6 Total — — — — — — — — — — — 3.91154 9.59421 13.5058 0.40230 0.00968 — 26.4469Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — 0.64760 1.64716 2.29476 0.06661 0.00160 — 4.43776 CityPark
— — — — — — — — — — — 0.00000 -0.05873 -0.05873 -0.00001 > -0.000005
— -0.0591
8 Total — — — — — — — — — — — 0.64760 1.58843 2.23603 0.06661 0.00160 — 4.37858
4.5. Waste Emissions by Land Use
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 62 / 91
4.5.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 43.1299 0.00000 43.1299 4.31068 0.00000 — 150.897 CityPark
— — — — — — — — — — — 0.09270 0.00000 0.09270 0.00926 0.00000 — 0.32432 Total — — — — — — — — — — — 43.2226 0.00000 43.2226 4.31995 0.00000 — 151.221Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 43.1299 0.00000 43.1299 4.31068 0.00000 — 150.897 CityPark
— — — — — — — — — — — 0.09270 0.00000 0.09270 0.00926 0.00000 — 0.32432 Total — — — — — — — — — — — 43.2226 0.00000 43.2226 4.31995 0.00000 — 151.221Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — 7.14065 0.00000 7.14065 0.71368 0.00000 — 24.9827 CityPark
— — — — — — — — — — — 0.01535 0.00000 0.01535 0.00153 0.00000 — 0.05369 Total — — — — — — — — — — — 7.15600 0.00000 7.15600 0.71522 0.00000 — 25.0364 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 63 / 91
4.5.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 10.7825 0.00000 10.7825 1.07767 0.00000 — 37.7242 CityPark
— — — — — — — — — — — 0.02317 0.00000 0.02317 0.00232 0.00000 — 0.08108 Total — — — — — — — — — — — 10.8057 0.00000 10.8057 1.07999 0.00000 — 37.8053Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — 10.7825 0.00000 10.7825 1.07767 0.00000 — 37.7242 CityPark
— — — — — — — — — — — 0.02317 0.00000 0.02317 0.00232 0.00000 — 0.08108 Total — — — — — — — — — — — 10.8057 0.00000 10.8057 1.07999 0.00000 — 37.8053Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — 1.78516 0.00000 1.78516 0.17842 0.00000 — 6.24568 CityPark
— — — — — — — — — — — 0.00384 0.00000 0.00384 0.00038 0.00000 — 0.01342 Total — — — — — — — — — — — 1.78900 0.00000 1.78900 0.17880 0.00000 — 6.25910 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 64 / 91
4.6. Refrigerant Emissions by Land Use4.6.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 10.5129 10.5129
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Total — — — — — — — — — — — — — — — — 10.5129 10.5129Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 10.5129 10.5129
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Total — — — — — — — — — — — — — — — — 10.5129 10.5129Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — — — — — — 1.74053 1.74053
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 65 / 91
Total — — — — — — — — — — — — — — — — 1.74053 1.74053
4.6.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 10.5129 10.5129
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Total — — — — — — — — — — — — — — — — 10.5129 10.5129Daily,Winter(Max) ——————————————————
HighTurnover(SitDownRestaurant)
— — — — — — — — — — — — — — — — 10.5129 10.5129
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Total — — — — — — — — — — — — — — — — 10.5129 10.5129Annual — — — — — — — — — — — — — — — — — —HighTurnover(SitDownRestaurant) — — — — — — — — — — — — — — — — 1.74053 1.74053
CityPark
— — — — — — — — — — — — — — — — 0.00000 0.00000
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 66 / 91
Total — — — — — — — — — — — — — — — — 1.74053 1.74053
4.7. Offroad Emissions By Equipment Type4.7.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.7.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 67 / 91
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type4.8.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 68 / 91
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type4.9.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 69 / 91
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Winter(Max)
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type4.10.1. Soil Carbon Accumulation By Vegetation Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 70 / 91
Daily,Winter(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 71 / 91
Subtotal — — — — — — — — — — — — — — — — — —
———————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 72 / 91
LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.6. Avoided and Sequestered Emissions by Species - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 73 / 91
Subtotal — — — — — — — — — — — — — — — — — —
Sequestered
——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
5. Activity Data5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase DescriptionGrading Grading 10/1/2028 1/31/2029 5.00000 88.0000 —Building Construction Building Construction 2/1/2029 9/30/2031 5.00000 694.000 —Paving Paving 7/1/2031 10/31/2031 5.00000 89.0000 —Architectural Coating Architectural Coating 7/1/2031 12/30/2031 5.00000 131.000 —
5.2. Off-Road Equipment
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 74 / 91
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorGrading Graders Diesel Tier 4 Final 1.000000 8.00000 148.000 0.41000Grading Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Grading Tractors/Loaders/Back hoes
Diesel Tier 4 Final 2.00000 7.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 8.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 2.00000 7.00000 82.0000 0.20000Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000Building Construction Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 6.00000 84.0000 0.37000
Building Construction Welders Diesel Average 3.00000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 1.000000 8.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 8.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 1.000000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000Paving Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorGrading Graders Diesel Tier 4 Final 1.000000 8.00000 148.000 0.41000Grading Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Grading Tractors/Loaders/Back hoes
Diesel Tier 4 Final 2.00000 7.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 8.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 2.00000 7.00000 82.0000 0.20000 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 75 / 91
Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Tractors/Loaders/Back
hoes
Diesel Tier 4 Final 1.000000 6.00000 84.0000 0.37000
Building Construction Welders Diesel Average 3.00000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 1.000000 8.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 8.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 1.000000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000Paving Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.3. Construction Vehicles5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixGrading Worker 10.00000 18.5000 LDA,LDT1,LDT2Grading Vendor — 10.2000 HHDT,MHDTGrading Hauling 1.56818 20.0000 HHDTGrading Onsite truck — — HHDTBuilding Construction Worker 2.82450 18.5000 LDA,LDT1,LDT2Building Construction Vendor 1.10223 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 15.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDT Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 76 / 91
Architectural Coating Worker 0.56490 18.5000 LDA,LDT1,LDT2 Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixGrading Worker 10.00000 18.5000 LDA,LDT1,LDT2Grading Vendor — 10.2000 HHDT,MHDTGrading Hauling 1.56818 20.0000 HHDTGrading Onsite truck — — HHDTBuilding Construction Worker 2.82450 18.5000 LDA,LDT1,LDT2Building Construction Vendor 1.10223 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 15.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 0.56490 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.4. Vehicles5.4.1. Construction Vehicle Control StrategiesNon-applicable. No control strategies activated by user.
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 77 / 91
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior AreaCoated (sq ft)
Non-Residential Interior AreaCoated (sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 10,087.5 3,362.50 —
5.6. Dust Mitigation5.6.1. Construction Earthmoving Activities Phase Name Material Imported (Cubic
Yards)
Material Exported (CubicYards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Grading — 1,100.00 88.0000 0.00000 0.00000Paving 0.00000 0.00000 0.00000 0.00000 0.00000
5.6.2. Construction Earthmoving Control StrategiesNon-applicable. No control strategies activated by user.5.7. Construction Paving Phase Name Land Use Area Paved (acres) % AsphaltPaving High Turnover (Sit Down Restaurant) 0.00000 0%Paving City Park 0.00000 0%
5.8. Construction Electricity Consumption and Emissions FactorskWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O2028 0.00000 346.196 0.03300 0.004002029 0.00000 346.196 0.03300 0.004002030 0.00000 260.788 0.03300 0.004002031 0.00000 260.788 0.03300 0.00400 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 78 / 91
5.9. Operational Mobile Sources5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearHigh Turnover (SitDown Restaurant) 332.114 332.114 332.114 121,222 3,598.79 3,598.79 3,598.79 1,313,557 City Park 1.56000 1.56000 1.56000 569.400 16.9041 16.9041 16.9041 6,170.01
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearHigh Turnover (SitDown Restaurant) 294.256 294.256 294.256 107,404 3,188.56 3,188.56 3,188.56 1,163,825 City Park 1.49136 1.49136 1.49136 544.346 16.1604 16.1604 16.1604 5,898.53
5.10. Operational Area Sources5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number)High Turnover (Sit Down Restaurant) Wood Fireplaces 0 0High Turnover (Sit Down Restaurant) Gas Fireplaces 0 0High Turnover (Sit Down Restaurant) Propane Fireplaces 0 0High Turnover (Sit Down Restaurant) Electric Fireplaces 0 0High Turnover (Sit Down Restaurant) No Fireplaces 0 0High Turnover (Sit Down Restaurant) Conventional Wood Stoves 0 0High Turnover (Sit Down Restaurant) Catalytic Wood Stoves 0 0High Turnover (Sit Down Restaurant) Non-Catalytic Wood Stoves 0 0High Turnover (Sit Down Restaurant) Pellet Wood Stoves 0 0City Park Wood Fireplaces 0 0 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 79 / 91
City Park Gas Fireplaces 0 0
City Park Propane Fireplaces 0 0City Park Electric Fireplaces 0 0City Park No Fireplaces 0 0City Park Conventional Wood Stoves 0 0City Park Catalytic Wood Stoves 0 0City Park Non-Catalytic Wood Stoves 0 0City Park Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sqft)
Residential Exterior Area Coated (sqft)
Non-Residential Interior Area Coated(sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
0.00000 0.00000 10,087.5 3,362.50 —
5.10.3. Landscape Equipment
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.10.4. Landscape Equipment - Mitigated
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.11. Operational Energy Consumption5.11.1. UnmitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 80 / 91
Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) High Turnover (Sit DownRestaurant)
230,108 260.788 0.0330 0.0040 773,096
City Park 0.00000 260.788 0.0330 0.0040 0.00000
5.11.2. MitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)High Turnover (Sit DownRestaurant) 230,108 260.788 0.0330 0.0040 773,096
City Park 0.00000 260.788 0.0330 0.0040 0.00000
5.12. Operational Water and Wastewater Consumption5.12.1. Unmitigated Land Use Indoor Water (gal/year) Outdoor Water (gal/year)High Turnover (Sit Down Restaurant) 2,041,264 12,927.6City Park 0.00000 399,749
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year)High Turnover (Sit Down Restaurant) 2,041,264 5,464.19City Park 0.00000 -93,551.7
5.13. Operational Waste Generation5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 81 / 91
High Turnover (Sit Down Restaurant) 80.0275 0.00000
City Park 0.17200 0.00000
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)High Turnover (Sit Down Restaurant) 20.0069 0.00000City Park 0.04300 0.00000
5.14. Operational Refrigeration and Air Conditioning Equipment5.14.1. Unmitigated Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedHigh Turnover (SitDown Restaurant) Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
High Turnover (SitDown Restaurant)
Other commercial A/Cand heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
High Turnover (SitDown Restaurant)
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
City Park Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
City Park Stand-alone retail
refrigerators andfreezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
5.14.2. Mitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedHigh Turnover (SitDown Restaurant) Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 82 / 91
18.0000 4.00000 4.00000 1.80000 2,088.00 R-410A High Turnover (Sit Down Restaurant)
Other commercial A/Cand heat pumps
High Turnover (SitDown Restaurant)
Walk-in refrigeratorsand freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
City Park Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
City Park Stand-alone retail
refrigerators andfreezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
5.15. Operational Off-Road Equipment5.15.1. Unmitigated5.15.2. Mitigated5.16. Stationary Sources5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers5.17. User Defined5.18. Vegetation5.18.1. Land Use Change5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 83 / 91
5.18.1. Biomass Cover Type5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report6.1. Climate Risk SummaryCal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 whichassumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location UnitTemperature and Extreme Heat 0.00000 annual days of extreme heatExtreme Precipitation 0.00000 annual days with precipitation above 20 mmSea Level Rise 0.00000 meters of inundation depthWildfire 0.00000 annual hectares burned Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 84 / 91
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures fromobserved historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall ifreceived over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), andconsider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled withextreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 metersWildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical dataof climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. Thefour simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range ofdifferent rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1 0 0 N/AExtreme Precipitation N/A N/A N/A N/ASea Level Rise 1 0 0 N/AWildfire 1 0 0 N/AFlooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 0 0 0 N/A The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reductionmeasures.6.3. Adjusted Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1112Extreme Precipitation N/A N/A N/A N/ASea Level Rise 1 1 1 2 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 85 / 91
Wildfire 1112
Flooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 1112 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reductionmeasures.6.4. Climate Risk Reduction Measures7. Health and Equity Details7.1. CalEnviroScreen 4.0 ScoresThe maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census TractExposure Indicators —
AQ-Ozone 59.6889AQ-PM 41.1450AQ-DPM 81.7299Drinking Water 59.7727Lead Risk Housing 33.5854Pesticides 0.00000Toxic Releases 25.9565Traffic 86.6500Effect Indicators —
CleanUp Sites 0.00000Groundwater 22.1152
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 86 / 91
Haz Waste Facilities/Generators 40.1324
Impaired Water Bodies 86.9593Solid Waste 52.8981Sensitive Population —
Asthma 14.7931Cardio-vascular 19.4791Low Birth Weights 52.5404Socioeconomic Factor Indicators —Education 71.7540Housing 87.8834Linguistic 38.1378Poverty 46.6080Unemployment 60.5674
7.2. Healthy Places Index ScoresThe maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census TractEconomic
—
Above Poverty 43.9753625Employed 80.73912486Median HI 26.34415501Education —
Bachelor's or higher 52.44450148High school enrollment 100Preschool enrollment 77.6337739Transportation —
Auto Access 18.65776979Active commuting 53.41973566
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 87 / 91
Social
—
2-parent households 9.418709098Voting 62.64596433Neighborhood —
Alcohol availability 21.69896061Park access 81.35506224Retail density 88.31002181Supermarket access 73.66867702Tree canopy 65.52033877Housing —
Homeownership 22.10958553Housing habitability 14.59001668Low-inc homeowner severe housing cost burden 6.120877711Low-inc renter severe housing cost burden 37.22571539Uncrowded housing 61.41408957Health Outcomes —
Insured adults 34.59514949Arthritis 45.8Asthma ER Admissions 80.1High Blood Pressure 39.5Cancer (excluding skin) 34.5Asthma 37.3Coronary Heart Disease 43.7Chronic Obstructive Pulmonary Disease 35.3Diagnosed Diabetes 70.5Life Expectancy at Birth 24.2Cognitively Disabled 16.7Physically Disabled 26.6 Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 88 / 91
Heart Attack ER Admissions 63.6
Mental Health Not Good 43.4Chronic Kidney Disease 55.3Obesity 47.8Pedestrian Injuries 48.7Physical Health Not Good 46.9Stroke 45.2Health Risk Behaviors —
Binge Drinking 26.9Current Smoker 45.9No Leisure Time for Physical Activity 48.0Climate Change Exposures —Wildfire Risk 17.9SLR Inundation Area 0.0Children 64.0Elderly 47.3English Speaking 51.5Foreign-born 55.9Outdoor Workers 82.9Climate Change Adaptive Capacity —Impervious Surface Cover 64.0Traffic Density 94.4Traffic Access 23.0Other Indices —
Hardship 53.4Other Decision Support
—
2016 Voting 69.3
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 89 / 91
7.3. Overall Health & Equity Scores
Metric Result for Project Census TractCalEnviroScreen 4.0 Score for Project Location (a) 51.0000Healthy Places Index Score for Project Location (b) 47.0000Project Located in a Designated Disadvantaged Community (Senate Bill 535) NoProject Located in a Low-Income Community (Assembly Bill 1550) YesProject Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.7.4. Health & Equity MeasuresNo Health & Equity Measures selected.7.5. Evaluation ScorecardHealth & Equity Evaluation Scorecard not completed.7.6. Health & Equity Custom MeasuresNo Health & Equity Custom Measures created.8. User Changes to Default Data8.1. Justifications Screen JustificationConstruction: Construction Phases As per the applicantConstruction: Off-Road Equipment As per AQ MM-1Operations: Vehicle Data As per the Associated Transportation Engineers #24075 Trip Generation Worksheet
8.4. Construction8.4.1. Construction Phases
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 90 / 91
Phase Type Phase Name Model Parameter Default Value New Value Grading Grading Start Date 11/4/2028 10/1/2028Grading Grading End Date 11/12/2028 1/31/2029Grading Grading Work Days per Phase 6.00000 88.0000Building Construction Building Construction Start Date 11/13/2028 2/1/2029Building Construction Building Construction End Date 9/17/2029 9/30/2031Building Construction Building Construction Work Days per Phase 220.000 694.000Paving Paving Start Date 9/18/2029 7/1/2031Paving Paving End Date 10/2/2029 10/31/2031Paving Paving Work Days per Phase 10.00000 89.0000Architectural Coating Architectural Coating Start Date 10/3/2029 7/1/2031Architectural Coating Architectural Coating End Date 10/17/2029 12/30/2031Architectural Coating Architectural Coating Work Days per Phase 10.00000 131.000
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New ValueGrading Graders Engine Tier Average Tier 4 FinalGrading Rubber Tired Dozers Engine Tier Average Tier 4 FinalGrading Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalBuilding Construction Cranes Engine Tier Average Tier 4 FinalBuilding Construction Forklifts Engine Tier Average Tier 4 FinalBuilding Construction Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalPaving Pavers Engine Tier Average Tier 4 FinalPaving Paving Equipment Engine Tier Average Tier 4 FinalPaving Tractors/Loaders/Backhoes Engine Tier Average Tier 4 Final
8.5. Operations
Thousand Oaks Downtown Specific Plan: Phase 2B v2 Detailed Report, 4/28/2026 91 / 91
8.5.1. Mobile Sources8.5.1.1. Vehicle Data
Land Use Model Parameter Units Default Value New ValueHigh Turnover (Sit Down Restaurant) Weekday Trip Rate size/day 112.180 49.3850High Turnover (Sit Down Restaurant) Saturday Trip Rate size/day 122.400 49.3850High Turnover (Sit Down Restaurant) Sunday Trip Rate size/day 142.640 49.3850High Turnover (Sit Down Restaurant) Weekday Primary Trip % 33.3500 100.0000High Turnover (Sit Down Restaurant) Weekday Divert Trip % 23.6500 0.00000High Turnover (Sit Down Restaurant) Weekday Pass-By Trip % 43.0000 0.00000City Park Saturday Trip Rate size/day 1.96000 0.78000City Park Sunday Trip Rate size/day 2.19000 0.78000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 1 / 87
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report Table of Contents1. Basic Project Information
1.1. Basic Project Information1.2. Land Use Types1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated2.2.2. Onsite Construction Emissions by Year, Unmitigated2.2.3. Offsite Construction Emissions by Year, Unmitigated2.2.4. Total Construction Emissions by Year, Mitigated2.2.5. Onsite Construction Emissions by Year, Mitigated2.2.6. Offsite Construction Emissions by Year, Mitigated
2.3. Operations Emissions Compared Against Thresholds2.4. Operations Emissions by Sector, Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 2 / 87
2.5. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Demolition (2028)
3.1.1. Onsite - Unmitigated3.1.2. Offsite - Unmitigated3.1.3. Onsite - Mitigated3.1.4. Offsite - Mitigated
3.2. Demolition (2029)
3.2.1. Onsite - Unmitigated3.2.2. Offsite - Unmitigated3.2.3. Onsite - Mitigated3.2.4. Offsite - Mitigated
3.3. Building Construction (2029)
3.3.1. Onsite - Unmitigated3.3.2. Offsite - Unmitigated3.3.3. Onsite - Mitigated3.3.4. Offsite - Mitigated
3.4. Building Construction (2030)
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 3 / 87
3.4.1. Onsite - Unmitigated3.4.2. Offsite - Unmitigated3.4.3. Onsite - Mitigated3.4.4. Offsite - Mitigated
3.5. Building Construction (2031)
3.5.1. Onsite - Unmitigated3.5.2. Offsite - Unmitigated3.5.3. Onsite - Mitigated3.5.4. Offsite - Mitigated
3.6. Paving (2031)
3.6.1. Onsite - Unmitigated3.6.2. Offsite - Unmitigated3.6.3. Onsite - Mitigated3.6.4. Offsite - Mitigated
3.7. Architectural Coating (2031)
3.7.1. Onsite - Unmitigated3.7.2. Offsite - Unmitigated3.7.3. Onsite - Mitigated Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 4 / 87
3.7.4. Offsite - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated4.2.2. Electricity Emissions By Land Use - Mitigated4.2.3. Natural Gas Emissions By Land Use - Unmitigated4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 5 / 87
4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 6 / 87
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule5.2. Off-Road Equipment
5.2.1. Unmitigated5.2.2. Mitigated
5.3. Construction Vehicles
5.3.1. Unmitigated5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving5.8. Construction Electricity Consumption and Emissions Factors Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 7 / 87
5.9. Operational Mobile Sources
5.9.1. Unmitigated5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths5.10.2. Architectural Coatings5.10.3. Landscape Equipment5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated5.12.2. Mitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 8 / 87
5.14.1. Unmitigated5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers
5.17. User Defined5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 9 / 87
5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary6.2. Initial Climate Risk Scores6.3. Adjusted Climate Risk Scores6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores7.2. Healthy Places Index Scores7.3. Overall Health & Equity Scores7.4. Health & Equity Measures7.5. Evaluation Scorecard7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications8.4. Construction
8.4.1. Construction Phases8.4.2. Off-Road Equipment
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 10 / 87
8.4.6. Trips and VMT
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 11 / 87
1. Basic Project Information1.1. Basic Project Information Data Field ValueProject Name Thousand Oaks Downtown Specific Plan: Phase 2C v2Construction Start Date 10/1/2028Operational Year 2031Lead Agency —
Land Use Scale Project/siteAnalysis Level for Defaults CountyWindspeed (m/s) 2.70000Precipitation (days) 22.6000Location 34.174671628196165, -118.8479022493314County VenturaCity Thousand OaksAir District Ventura County APCDAir Basin South Central CoastTAZ 3505EDFZ 8Electric Utility Southern California EdisonGas Utility Southern California GasApp Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special LandscapeArea (sq ft)
Population Description
Government (CivicCenter)
80.9000 1000sqft 1.85721 80,900.0 1,000.000 — — —
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 12 / 87
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector
# Measure Title
Construction C-10-A Water Exposed SurfacesConstruction C-10-B Water Active Demolition SitesConstruction C-10-C Water Unpaved Construction RoadsConstruction C-11 Limit Vehicle Speeds on Unpaved RoadsConstruction C-12 Sweep Paved RoadsTransportation T-7 Implement Commute Trip Reduction MarketingTransportation T-8 Provide Ridesharing ProgramTransportation T-10 Provide End-of-Trip Bicycle FacilitiesArea Sources LL-1 Replace Gas Powered Landscape Equipment with Zero-Emission Landscape Equipment
Area Sources AS-2 Use Low-VOC Paints
2. Emissions Summary2.1. Construction Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Unmit. 4.12147 3.94722 7.56551 21.2427 0.03353 0.15667 0.68289 0.83956 0.14725 0.16482 0.31207 — 3,799.67 3,799.67 0.12917 0.08260 1.80015 3,828.35Mit. 4.12147 3.94722 7.56551 21.2427 0.03353 0.15667 0.68289 0.83956 0.14725 0.16482 0.31207 — 3,799.67 3,799.67 0.12917 0.08260 1.80015 3,828.35%Reduced ——————————————————
Daily,Winter(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 13 / 87
Unmit. 3.32329 3.26843 5.47367 15.3150 0.02552 0.11246 0.79051 0.86024 0.10533 0.14089 0.21599 — 2,861.95 2,861.95 0.10842 0.08317 0.04294 2,882.95 Mit. 3.32329 3.26843 5.47367 15.3150 0.02552 0.11246 0.79051 0.86024 0.10533 0.14089 0.21599 — 2,861.95 2,861.95 0.10842 0.08317 0.04294 2,882.95%Reduced ——————————————————
AverageDaily(Max)
——————————————————
Unmit. 1.56943 1.48929 3.85160 9.16263 0.01619 0.07751 0.33898 0.41649 0.07275 0.07980 0.15255 — 1,797.14 1,797.14 0.06038 0.05759 0.48902 1,816.30Mit. 1.56943 1.48929 3.85160 9.16263 0.01619 0.07751 0.33898 0.41649 0.07275 0.07980 0.15255 — 1,797.14 1,797.14 0.06038 0.05759 0.48902 1,816.30%Reduced ——————————————————
Annual(Max)
——————————————————
Unmit. 0.28642 0.27180 0.70292 1.67218 0.00295 0.01415 0.06186 0.07601 0.01328 0.01456 0.02784 — 297.537 297.537 0.01000 0.00954 0.08096 300.710Mit. 0.28642 0.27180 0.70292 1.67218 0.00295 0.01415 0.06186 0.07601 0.01328 0.01456 0.02784 — 297.537 297.537 0.01000 0.00954 0.08096 300.710%Reduced ——————————————————
2.2. Construction Emissions by Year2.2.1. Total Construction Emissions by Year, UnmitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.84953 0.72936 5.43222 12.7181 0.02240 0.11246 0.45183 0.56429 0.10533 0.11066 0.21599 — 2,496.58 2,496.58 0.08179 0.08260 1.65822 2,524.892030 0.81964 0.69635 5.36599 12.6187 0.02240 0.10354 0.45183 0.55537 0.09712 0.11066 0.20778 — 2,479.64 2,479.64 0.08179 0.07962 1.46751 2,506.882031 4.12147 3.94722 7.56551 21.2427 0.03353 0.15667 0.68289 0.83956 0.14725 0.16482 0.31207 — 3,799.67 3,799.67 0.12917 0.07935 1.80015 3,828.35 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 14 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily -
Winter(Max)
2028 0.46198 0.42135 2.89483 15.3150 0.02552 0.06973 0.79051 0.86024 0.06777 0.14089 0.20866 — 2,861.95 2,861.95 0.10842 0.06130 0.02364 2,882.952029 0.84838 0.71737 5.47367 15.2698 0.02550 0.11246 0.79051 0.85646 0.10533 0.14089 0.21599 — 2,851.88 2,851.88 0.10794 0.08317 0.04294 2,872.392030 0.81877 0.69463 5.39362 12.5035 0.02240 0.10354 0.45183 0.55537 0.09712 0.11066 0.20778 — 2,465.96 2,465.96 0.08236 0.07962 0.03812 2,491.782031 3.32329 3.26843 5.32796 12.4165 0.02241 0.09613 0.45183 0.54796 0.09031 0.11066 0.20097 — 2,449.13 2,449.13 0.08179 0.07962 0.03352 2,474.94AverageDaily ——————————————————
2028 0.08323 0.07596 0.52088 2.75753 0.00459 0.01255 0.14177 0.15433 0.01220 0.02523 0.03743 — 515.446 515.446 0.01947 0.01099 0.07086 519.2772029 0.58140 0.49289 3.74104 9.16263 0.01619 0.07751 0.33898 0.41649 0.07275 0.07980 0.15255 — 1,797.14 1,797.14 0.06038 0.05759 0.48902 1,816.302030 0.58444 0.49555 3.85160 8.93532 0.01600 0.07396 0.31824 0.39219 0.06937 0.07792 0.14729 — 1,762.87 1,762.87 0.05842 0.05687 0.45267 1,781.732031 1.56943 1.48929 3.48533 8.88566 0.01487 0.06715 0.30086 0.36801 0.06308 0.07299 0.13607 — 1,654.83 1,654.83 0.05616 0.04719 0.35884 1,670.66Annual — — — — — — — — — — — — — — — — — —2028 0.01519 0.01386 0.09506 0.50325 0.00084 0.00229 0.02587 0.02817 0.00223 0.00460 0.00683 — 85.3379 85.3379 0.00322 0.00182 0.01173 85.97232029 0.10611 0.08995 0.68274 1.67218 0.00295 0.01415 0.06186 0.07601 0.01328 0.01456 0.02784 — 297.537 297.537 0.01000 0.00954 0.08096 300.7102030 0.10666 0.09044 0.70292 1.63070 0.00292 0.01350 0.05808 0.07157 0.01266 0.01422 0.02688 — 291.863 291.863 0.00967 0.00942 0.07495 294.9862031 0.28642 0.27180 0.63607 1.62163 0.00271 0.01226 0.05491 0.06716 0.01151 0.01332 0.02483 — 273.977 273.977 0.00930 0.00781 0.05941 276.597
2.2.2. Onsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 0.00000 0.10948 0.10235 0.00000 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172030 0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 0.00000 0.10056 0.09414 0.00000 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172031 3.95808 3.80854 7.07710 19.2720 0.03055 0.15368 0.00000 0.15368 0.14427 0.00000 0.14427 — 2,925.60 2,925.60 0.11868 0.02374 0.00000 2,935.64Daily -Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 15 / 87
2028 0.40209 0.36904 2.52141 14.6311 0.02393 0.06685 0.56799 0.63484 0.06489 0.08601 0.15090 — 2,494.52 2,494.52 0.10119 0.02024 0.00000 2,503.08 2029 0.73481 0.62494 4.93889 14.6248 0.02392 0.10948 0.56799 0.63106 0.10235 0.08601 0.14742 — 2,492.95 2,492.95 0.10112 0.02022 0.00000 2,501.512030 0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 0.00000 0.10056 0.09414 0.00000 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172031 3.26250 3.21601 4.85617 11.2912 0.01942 0.09315 0.00000 0.09315 0.08733 0.00000 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.18AverageDaily ——————————————————
2028 0.07239 0.06644 0.45395 2.63417 0.00431 0.01204 0.10226 0.11430 0.01168 0.01549 0.02717 — 449.111 449.111 0.01822 0.00364 0.00000 450.6532029 0.50419 0.43046 3.37981 8.29278 0.01415 0.07538 0.03446 0.10984 0.07062 0.00522 0.07584 — 1,328.40 1,328.40 0.05389 0.01078 0.00000 1,332.962030 0.50891 0.43320 3.49553 8.07706 0.01387 0.07183 0.00000 0.07183 0.06724 0.00000 0.06724 — 1,286.42 1,286.42 0.05218 0.01044 0.00000 1,290.842031 1.49841 1.42983 3.22108 8.09924 0.01328 0.06556 0.00000 0.06556 0.06149 0.00000 0.06149 — 1,251.03 1,251.03 0.05075 0.01015 0.00000 1,255.32Annual — — — — — — — — — — — — — — — — — —2028 0.01321 0.01213 0.08285 0.48074 0.00079 0.00220 0.01866 0.02086 0.00213 0.00283 0.00496 — 74.3555 74.3555 0.00302 0.00060 0.00000 74.61072029 0.09201 0.07856 0.61681 1.51343 0.00258 0.01376 0.00629 0.02005 0.01289 0.00095 0.01384 — 219.932 219.932 0.00892 0.00178 0.00000 220.6872030 0.09288 0.07906 0.63793 1.47406 0.00253 0.01311 0.00000 0.01311 0.01227 0.00000 0.01227 — 212.982 212.982 0.00864 0.00173 0.00000 213.7132031 0.27346 0.26094 0.58785 1.47811 0.00242 0.01196 0.00000 0.01196 0.01122 0.00000 0.01122 — 207.122 207.122 0.00840 0.00168 0.00000 207.832
2.2.3. Offsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.11473 0.10442 0.49333 1.38800 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 695.581 695.581 0.00873 0.06799 1.65822 717.7182030 0.10716 0.08987 0.47224 1.31081 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 678.646 678.646 0.00873 0.06501 1.46751 699.7032031 0.16340 0.13868 0.48840 1.97065 0.00298 0.00298 0.68289 0.68587 0.00298 0.16482 0.16780 — 874.072 874.072 0.01050 0.05562 1.80015 892.708Daily -Winter(Max) ——————————————————
2028 0.05989 0.05231 0.37342 0.68389 0.00158 0.00288 0.22252 0.22540 0.00288 0.05488 0.05776 — 367.430 367.430 0.00723 0.04106 0.02364 379.8702029 0.11357 0.09243 0.53478 1.26596 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 681.628 681.628 0.00930 0.06856 0.04294 702.334 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 16 / 87
2030 0.10630 0.08814 0.49987 1.19563 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 664.962 664.962 0.00930 0.06501 0.03812 684.604 2031 0.10201 0.08471 0.47179 1.12529 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 648.137 648.137 0.00873 0.06501 0.03352 667.760AverageDaily ——————————————————
2028 0.01084 0.00952 0.06692 0.12336 0.00029 0.00052 0.03951 0.04003 0.00052 0.00974 0.01026 — 66.3341 66.3341 0.00125 0.00734 0.07086 68.62452029 0.07721 0.06243 0.36123 0.86985 0.00205 0.00212 0.30452 0.30665 0.00212 0.07458 0.07671 — 468.740 468.740 0.00649 0.04682 0.48902 483.3432030 0.07553 0.06235 0.35607 0.85826 0.00213 0.00213 0.31824 0.32037 0.00213 0.07792 0.08005 — 476.447 476.447 0.00624 0.04643 0.45267 490.8932031 0.07102 0.05947 0.26425 0.78642 0.00159 0.00159 0.30086 0.30245 0.00159 0.07299 0.07458 — 403.808 403.808 0.00542 0.03704 0.35884 415.340Annual — — — — — — — — — — — — — — — — — —2028 0.00198 0.00174 0.01221 0.02251 0.00005 0.00009 0.00721 0.00731 0.00009 0.00178 0.00187 — 10.9824 10.9824 0.00021 0.00122 0.01173 11.36162029 0.01409 0.01139 0.06593 0.15875 0.00037 0.00039 0.05558 0.05596 0.00039 0.01361 0.01400 — 77.6053 77.6053 0.00107 0.00775 0.08096 80.02292030 0.01378 0.01138 0.06498 0.15663 0.00039 0.00039 0.05808 0.05847 0.00039 0.01422 0.01461 — 78.8812 78.8812 0.00103 0.00769 0.07495 81.27292031 0.01296 0.01085 0.04823 0.14352 0.00029 0.00029 0.05491 0.05520 0.00029 0.01332 0.01361 — 66.8550 66.8550 0.00090 0.00613 0.05941 68.7643
2.2.4. Total Construction Emissions by Year, MitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.84953 0.72936 5.43222 12.7181 0.02240 0.11246 0.45183 0.56429 0.10533 0.11066 0.21599 — 2,496.58 2,496.58 0.08179 0.08260 1.65822 2,524.892030 0.81964 0.69635 5.36599 12.6187 0.02240 0.10354 0.45183 0.55537 0.09712 0.11066 0.20778 — 2,479.64 2,479.64 0.08179 0.07962 1.46751 2,506.882031 4.12147 3.94722 7.56551 21.2427 0.03353 0.15667 0.68289 0.83956 0.14725 0.16482 0.31207 — 3,799.67 3,799.67 0.12917 0.07935 1.80015 3,828.35Daily -Winter(Max) ——————————————————
2028 0.46198 0.42135 2.89483 15.3150 0.02552 0.06973 0.79051 0.86024 0.06777 0.14089 0.20866 — 2,861.95 2,861.95 0.10842 0.06130 0.02364 2,882.952029 0.84838 0.71737 5.47367 15.2698 0.02550 0.11246 0.79051 0.85646 0.10533 0.14089 0.21599 — 2,851.88 2,851.88 0.10794 0.08317 0.04294 2,872.392030 0.81877 0.69463 5.39362 12.5035 0.02240 0.10354 0.45183 0.55537 0.09712 0.11066 0.20778 — 2,465.96 2,465.96 0.08236 0.07962 0.03812 2,491.78 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 17 / 87
2031 3.32329 3.26843 5.32796 12.4165 0.02241 0.09613 0.45183 0.54796 0.09031 0.11066 0.20097 — 2,449.13 2,449.13 0.08179 0.07962 0.03352 2,474.94 AverageDaily
——————————————————
2028 0.08323 0.07596 0.52088 2.75753 0.00459 0.01255 0.14177 0.15433 0.01220 0.02523 0.03743 — 515.446 515.446 0.01947 0.01099 0.07086 519.2772029 0.58140 0.49289 3.74104 9.16263 0.01619 0.07751 0.33898 0.41649 0.07275 0.07980 0.15255 — 1,797.14 1,797.14 0.06038 0.05759 0.48902 1,816.302030 0.58444 0.49555 3.85160 8.93532 0.01600 0.07396 0.31824 0.39219 0.06937 0.07792 0.14729 — 1,762.87 1,762.87 0.05842 0.05687 0.45267 1,781.732031 1.56943 1.48929 3.48533 8.88566 0.01487 0.06715 0.30086 0.36801 0.06308 0.07299 0.13607 — 1,654.83 1,654.83 0.05616 0.04719 0.35884 1,670.66Annual — — — — — — — — — — — — — — — — — —2028 0.01519 0.01386 0.09506 0.50325 0.00084 0.00229 0.02587 0.02817 0.00223 0.00460 0.00683 — 85.3379 85.3379 0.00322 0.00182 0.01173 85.97232029 0.10611 0.08995 0.68274 1.67218 0.00295 0.01415 0.06186 0.07601 0.01328 0.01456 0.02784 — 297.537 297.537 0.01000 0.00954 0.08096 300.7102030 0.10666 0.09044 0.70292 1.63070 0.00292 0.01350 0.05808 0.07157 0.01266 0.01422 0.02688 — 291.863 291.863 0.00967 0.00942 0.07495 294.9862031 0.28642 0.27180 0.63607 1.62163 0.00271 0.01226 0.05491 0.06716 0.01151 0.01332 0.02483 — 273.977 273.977 0.00930 0.00781 0.05941 276.597
2.2.5. Onsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 0.00000 0.10948 0.10235 0.00000 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172030 0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 0.00000 0.10056 0.09414 0.00000 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172031 3.95808 3.80854 7.07710 19.2720 0.03055 0.15368 0.00000 0.15368 0.14427 0.00000 0.14427 — 2,925.60 2,925.60 0.11868 0.02374 0.00000 2,935.64Daily -Winter(Max) ——————————————————
2028 0.40209 0.36904 2.52141 14.6311 0.02393 0.06685 0.56799 0.63484 0.06489 0.08601 0.15090 — 2,494.52 2,494.52 0.10119 0.02024 0.00000 2,503.082029 0.73481 0.62494 4.93889 14.6248 0.02392 0.10948 0.56799 0.63106 0.10235 0.08601 0.14742 — 2,492.95 2,492.95 0.10112 0.02022 0.00000 2,501.512030 0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 0.00000 0.10056 0.09414 0.00000 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.172031 3.26250 3.21601 4.85617 11.2912 0.01942 0.09315 0.00000 0.09315 0.08733 0.00000 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 0.00000 1,807.18 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 18 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Average
Daily
2028 0.07239 0.06644 0.45395 2.63417 0.00431 0.01204 0.10226 0.11430 0.01168 0.01549 0.02717 — 449.111 449.111 0.01822 0.00364 0.00000 450.6532029 0.50419 0.43046 3.37981 8.29278 0.01415 0.07538 0.03446 0.10984 0.07062 0.00522 0.07584 — 1,328.40 1,328.40 0.05389 0.01078 0.00000 1,332.962030 0.50891 0.43320 3.49553 8.07706 0.01387 0.07183 0.00000 0.07183 0.06724 0.00000 0.06724 — 1,286.42 1,286.42 0.05218 0.01044 0.00000 1,290.842031 1.49841 1.42983 3.22108 8.09924 0.01328 0.06556 0.00000 0.06556 0.06149 0.00000 0.06149 — 1,251.03 1,251.03 0.05075 0.01015 0.00000 1,255.32Annual — — — — — — — — — — — — — — — — — —2028 0.01321 0.01213 0.08285 0.48074 0.00079 0.00220 0.01866 0.02086 0.00213 0.00283 0.00496 — 74.3555 74.3555 0.00302 0.00060 0.00000 74.61072029 0.09201 0.07856 0.61681 1.51343 0.00258 0.01376 0.00629 0.02005 0.01289 0.00095 0.01384 — 219.932 219.932 0.00892 0.00178 0.00000 220.6872030 0.09288 0.07906 0.63793 1.47406 0.00253 0.01311 0.00000 0.01311 0.01227 0.00000 0.01227 — 212.982 212.982 0.00864 0.00173 0.00000 213.7132031 0.27346 0.26094 0.58785 1.47811 0.00242 0.01196 0.00000 0.01196 0.01122 0.00000 0.01122 — 207.122 207.122 0.00840 0.00168 0.00000 207.832
2.2.6. Offsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily -Summer(Max)
——————————————————
2029 0.11473 0.10442 0.49333 1.38800 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 695.581 695.581 0.00873 0.06799 1.65822 717.7182030 0.10716 0.08987 0.47224 1.31081 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 678.646 678.646 0.00873 0.06501 1.46751 699.7032031 0.16340 0.13868 0.48840 1.97065 0.00298 0.00298 0.68289 0.68587 0.00298 0.16482 0.16780 — 874.072 874.072 0.01050 0.05562 1.80015 892.708Daily -Winter(Max) ——————————————————
2028 0.05989 0.05231 0.37342 0.68389 0.00158 0.00288 0.22252 0.22540 0.00288 0.05488 0.05776 — 367.430 367.430 0.00723 0.04106 0.02364 379.8702029 0.11357 0.09243 0.53478 1.26596 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 681.628 681.628 0.00930 0.06856 0.04294 702.3342030 0.10630 0.08814 0.49987 1.19563 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 664.962 664.962 0.00930 0.06501 0.03812 684.6042031 0.10201 0.08471 0.47179 1.12529 0.00298 0.00298 0.45183 0.45481 0.00298 0.11066 0.11364 — 648.137 648.137 0.00873 0.06501 0.03352 667.760AverageDaily ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 19 / 87
2028 0.01084 0.00952 0.06692 0.12336 0.00029 0.00052 0.03951 0.04003 0.00052 0.00974 0.01026 — 66.3341 66.3341 0.00125 0.00734 0.07086 68.6245 2029 0.07721 0.06243 0.36123 0.86985 0.00205 0.00212 0.30452 0.30665 0.00212 0.07458 0.07671 — 468.740 468.740 0.00649 0.04682 0.48902 483.3432030 0.07553 0.06235 0.35607 0.85826 0.00213 0.00213 0.31824 0.32037 0.00213 0.07792 0.08005 — 476.447 476.447 0.00624 0.04643 0.45267 490.8932031 0.07102 0.05947 0.26425 0.78642 0.00159 0.00159 0.30086 0.30245 0.00159 0.07299 0.07458 — 403.808 403.808 0.00542 0.03704 0.35884 415.340Annual — — — — — — — — — — — — — — — — — —2028 0.00198 0.00174 0.01221 0.02251 0.00005 0.00009 0.00721 0.00731 0.00009 0.00178 0.00187 — 10.9824 10.9824 0.00021 0.00122 0.01173 11.36162029 0.01409 0.01139 0.06593 0.15875 0.00037 0.00039 0.05558 0.05596 0.00039 0.01361 0.01400 — 77.6053 77.6053 0.00107 0.00775 0.08096 80.02292030 0.01378 0.01138 0.06498 0.15663 0.00039 0.00039 0.05808 0.05847 0.00039 0.01422 0.01461 — 78.8812 78.8812 0.00103 0.00769 0.07495 81.27292031 0.01296 0.01085 0.04823 0.14352 0.00029 0.00029 0.05491 0.05520 0.00029 0.01332 0.01361 — 66.8550 66.8550 0.00090 0.00613 0.05941 68.7643
2.3. Operations Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Unmit. 9.99005 9.34281 5.74563 56.9019 0.14887 0.13627 15.0026 15.1389 0.12930 3.80455 3.93385 279.318 16,594.2 16,873.5 28.7475 0.67684 33.4842 17,827.3Mit. 8.43027 7.89597 5.13022 47.3535 0.13211 0.12020 13.2925 13.4127 0.11537 3.37087 3.48624 279.318 14,895.2 15,174.5 28.6844 0.61022 29.6897 16,103.2%Reduced 16% 15% 11% 17% 11% 12% 11% 11% 11% 11% 11% — 10% 10% < 0.5% 10% 11% 10% Daily,Winter(Max)
——————————————————
Unmit. 9.31762 8.70326 6.31584 52.1791 0.14364 0.13006 15.0026 15.1327 0.12461 3.80455 3.92916 279.318 16,071.3 16,350.6 28.7879 0.71610 1.05987 17,284.8Mit. 8.38959 7.84165 5.66166 46.2865 0.12766 0.12024 13.2925 13.4127 0.11541 3.37087 3.48627 279.318 14,443.1 14,722.4 28.7205 0.64510 0.96148 15,633.7%Reduced 10% 10% 10% 11% 11% 8% 11% 11% 7% 11% 11% — 10% 10% < 0.5% 10% 9% 10% AverageDaily(Max)
——————————————————
Unmit. 7.46006 6.99300 4.60701 38.6357 0.10425 0.10850 10.5605 10.6690 0.10385 2.67862 2.78247 279.318 12,054.2 12,333.5 28.6079 0.53128 10.4634 13,217.5 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 20 / 87
Mit. 6.47002 6.07369 4.13469 32.7495 0.09267 0.09840 9.35674 9.45514 0.09495 2.37329 2.46823 279.318 10,878.4 11,157.7 28.5608 0.48130 9.29308 12,024.4 %Reduced
13% 13% 10% 15% 11% 9% 11% 11% 9% 11% 11% — 10% 10% < 0.5% 9% 11% 9% Annual(Max)
——————————————————
Unmit. 1.36146 1.27622 0.84078 7.05101 0.01903 0.01980 1.92730 1.94710 0.01895 0.48885 0.50780 46.2442 1,995.70 2,041.95 4.73636 0.08796 1.73233 2,188.30Mit. 1.18078 1.10845 0.75458 5.97678 0.01691 0.01796 1.70760 1.72556 0.01733 0.43313 0.45045 46.2442 1,801.04 1,847.29 4.72857 0.07969 1.53857 1,990.78%Reduced 13% 13% 10% 15% 11% 9% 11% 11% 9% 11% 11% — 10% 10% < 0.5% 9% 11% 9%
2.4. Operations Emissions by Sector, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Mobile 7.46604 6.89882 5.13908 52.8988 0.14520 0.08618 15.0026 15.0888 0.08072 3.80455 3.88527 — 14,791.8 14,791.8 0.55023 0.58353 33.2874 15,012.8Area 2.46054 2.41226 0.02961 3.51855 0.00021 0.00625 — 0.00625 0.00472 — 0.00472 — 14.4687 14.4687 0.00061 0.00012 — 14.5209Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,709.64 1,709.64 0.19015 0.01696 — 1,719.45Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675Total 9.99005 9.34281 5.74563 56.9019 0.14887 0.13627 15.0026 15.1389 0.12930 3.80455 3.93385 279.318 16,594.2 16,873.5 28.7475 0.67684 33.4842 17,827.3Daily,Winter(Max) ——————————————————
Mobile 7.42013 6.83751 5.73889 51.6945 0.14018 0.08622 15.0026 15.0889 0.08076 3.80455 3.88531 — 14,283.4 14,283.4 0.59125 0.62291 0.86312 14,484.7Area 1.83402 1.83402 ————————————————Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,709.64 1,709.64 0.19015 0.01696 — 1,719.45Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 21 / 87
Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675 Total 9.31762 8.70326 6.31584 52.1791 0.14364 0.13006 15.0026 15.1327 0.12461 3.80455 3.92916 279.318 16,071.3 16,350.6 28.7879 0.71610 1.05987 17,284.8AverageDaily ——————————————————
Mobile 5.25360 4.84209 4.01546 36.4159 0.10069 0.06157 10.5605 10.6221 0.05767 2.67862 2.73630 — 10,259.2 10,259.2 0.41087 0.43803 10.2666 10,410.2Area 2.14299 2.11918 0.01460 1.73518 0.00010 0.00308 — 0.00308 0.00233 — 0.00233 — 7.13525 7.13525 0.00030 0.00006 — 7.16097Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,709.64 1,709.64 0.19015 0.01696 — 1,719.45Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675Total 7.46006 6.99300 4.60701 38.6357 0.10425 0.10850 10.5605 10.6690 0.10385 2.67862 2.78247 279.318 12,054.2 12,333.5 28.6079 0.53128 10.4634 13,217.5Annual — — — — — — — — — — — — — — — — — —Mobile 0.95878 0.88368 0.73282 6.64590 0.01838 0.01124 1.92730 1.93853 0.01053 0.48885 0.49937 — 1,698.52 1,698.52 0.06802 0.07252 1.69976 1,723.53Area 0.39110 0.38675 0.00266 0.31667 0.00002 0.00056 — 0.00056 0.00043 — 0.00043 — 1.18132 1.18132 0.00005 0.00001 — 1.18558Energy 0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 283.050 283.050 0.03148 0.00281 — 284.674Water — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210Waste — — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954Refrig. — — — — — — — — — — — — — — — — 0.03257 0.03257Total 1.36146 1.27622 0.84078 7.05101 0.01903 0.01980 1.92730 1.94710 0.01895 0.48885 0.50780 46.2442 1,995.70 2,041.95 4.73636 0.08796 1.73233 2,188.30
2.5. Operations Emissions by Sector, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Mobile 6.61499 6.11243 4.55327 46.8688 0.12865 0.07635 13.2925 13.3688 0.07152 3.37087 3.44239 — 13,105.7 13,105.7 0.48751 0.51701 29.4930 13,301.5Area 1.75181 1.75181 ————————————————Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,711.26 1,711.26 0.19036 0.01699 — 1,721.08 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 22 / 87
Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925 Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675Total 8.43027 7.89597 5.13022 47.3535 0.13211 0.12020 13.2925 13.4127 0.11537 3.37087 3.48624 279.318 14,895.2 15,174.5 28.6844 0.61022 29.6897 16,103.2Daily,Winter(Max) ——————————————————
Mobile 6.57431 6.05810 5.08472 45.8018 0.12420 0.07639 13.2925 13.3689 0.07156 3.37087 3.44243 — 12,655.3 12,655.3 0.52385 0.55191 0.76473 12,833.6Area 1.75181 1.75181 ————————————————Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,709.64 1,709.64 0.19015 0.01696 — 1,719.45Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675Total 8.38959 7.84165 5.66166 46.2865 0.12766 0.12024 13.2925 13.4127 0.11541 3.37087 3.48627 279.318 14,443.1 14,722.4 28.7205 0.64510 0.96148 15,633.7AverageDaily ——————————————————
Mobile 4.65474 4.29014 3.55774 32.2648 0.08921 0.05455 9.35674 9.41129 0.05110 2.37329 2.42439 — 9,089.73 9,089.73 0.36403 0.38810 9.09633 9,223.58Area 1.75181 1.75181 ————————————————Energy 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 1,710.44 1,710.44 0.19025 0.01697 — 1,720.25Water — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Waste — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Refrig. — — — — — — — — — — — — — — — — 0.19675 0.19675Total 6.47002 6.07369 4.13469 32.7495 0.09267 0.09840 9.35674 9.45514 0.09495 2.37329 2.46823 279.318 10,878.4 11,157.7 28.5608 0.48130 9.29308 12,024.4Annual — — — — — — — — — — — — — — — — — —Mobile 0.84949 0.78295 0.64929 5.88833 0.01628 0.00996 1.70760 1.71756 0.00933 0.43313 0.44245 — 1,504.91 1,504.91 0.06027 0.06425 1.50600 1,527.07Area 0.31971 0.31971 ————————————————Energy 0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 283.182 283.182 0.03150 0.00281 — 284.807Water — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210Waste — — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 23 / 87
Refrig. — — — — — — — — — — — — — — — — 0.03257 0.03257 Total 1.18078 1.10845 0.75458 5.97678 0.01691 0.01796 1.70760 1.72556 0.01733 0.43313 0.45045 46.2442 1,801.04 1,847.29 4.72857 0.07969 1.53857 1,990.78
3. Construction Emissions Details3.1. Demolition (2028)3.1.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.40209 0.36904 2.52141 14.6311 0.02393 0.06685 — 0.06685 0.06489 — 0.06489 — 2,494.52 2,494.52 0.10119 0.02024 — 2,503.08 Demolition
— — — — — — 0.56799 0.56799 — 0.08601 0.08601 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.07239 0.06644 0.45395 2.63417 0.00431 0.01204 — 0.01204 0.01168 — 0.01168 — 449.111 449.111 0.01822 0.00364 — 450.653 Demolition
— — — — — — 0.10226 0.10226 — 0.01549 0.01549 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 24 / 87
Annual — — — — — — — — — — — — — — — — — —
Off-RoadEquipment
0.01321 0.01213 0.08285 0.48074 0.00079 0.00220 — 0.00220 0.00213 — 0.00213 — 74.3555 74.3555 0.00302 0.00060 — 74.6107 Demolition
— — — — — — 0.01866 0.01866 — 0.00283 0.00283 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.04823 0.04712 0.04988 0.58147 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 151.069 151.069 0.00248 0.00620 0.01305 152.992Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.01167 0.00519 0.32354 0.10242 0.00158 0.00288 0.05913 0.06201 0.00288 0.01658 0.01946 — 216.360 216.360 0.00475 0.03486 0.01059 226.878AverageDaily ——————————————————
Worker 0.00868 0.00853 0.00888 0.10516 0.00000 0.00000 0.02899 0.02899 0.00000 0.00679 0.00679 — 27.3961 27.3961 0.00040 0.00107 0.03911 27.7631Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00215 0.00099 0.05804 0.01821 0.00029 0.00052 0.01053 0.01104 0.00052 0.00296 0.00347 — 38.9379 38.9379 0.00086 0.00628 0.03175 40.8614Annual — — — — — — — — — — — — — — — — — —Worker 0.00158 0.00156 0.00162 0.01919 0.00000 0.00000 0.00529 0.00529 0.00000 0.00124 0.00124 — 4.53574 4.53574 0.00007 0.00018 0.00648 4.59649Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00039 0.00018 0.01059 0.00332 0.00005 0.00009 0.00192 0.00202 0.00009 0.00054 0.00063 — 6.44662 6.44662 0.00014 0.00104 0.00526 6.76507 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 25 / 87
3.1.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.40209 0.36904 2.52141 14.6311 0.02393 0.06685 — 0.06685 0.06489 — 0.06489 — 2,494.52 2,494.52 0.10119 0.02024 — 2,503.08 Demolition
— — — — — — 0.56799 0.56799 — 0.08601 0.08601 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.07239 0.06644 0.45395 2.63417 0.00431 0.01204 — 0.01204 0.01168 — 0.01168 — 449.111 449.111 0.01822 0.00364 — 450.653 Demolition
— — — — — — 0.10226 0.10226 — 0.01549 0.01549 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01321 0.01213 0.08285 0.48074 0.00079 0.00220 — 0.00220 0.00213 — 0.00213 — 74.3555 74.3555 0.00302 0.00060 — 74.6107 Demolition
— — — — — — 0.01866 0.01866 — 0.00283 0.00283 ———————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 26 / 87
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
— 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Onsite truck
3.1.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.04823 0.04712 0.04988 0.58147 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 151.069 151.069 0.00248 0.00620 0.01305 152.992Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.01167 0.00519 0.32354 0.10242 0.00158 0.00288 0.05913 0.06201 0.00288 0.01658 0.01946 — 216.360 216.360 0.00475 0.03486 0.01059 226.878AverageDaily ——————————————————
Worker 0.00868 0.00853 0.00888 0.10516 0.00000 0.00000 0.02899 0.02899 0.00000 0.00679 0.00679 — 27.3961 27.3961 0.00040 0.00107 0.03911 27.7631Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00215 0.00099 0.05804 0.01821 0.00029 0.00052 0.01053 0.01104 0.00052 0.00296 0.00347 — 38.9379 38.9379 0.00086 0.00628 0.03175 40.8614Annual — — — — — — — — — — — — — — — — — —Worker 0.00158 0.00156 0.00162 0.01919 0.00000 0.00000 0.00529 0.00529 0.00000 0.00124 0.00124 — 4.53574 4.53574 0.00007 0.00018 0.00648 4.59649Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00039 0.00018 0.01059 0.00332 0.00005 0.00009 0.00192 0.00202 0.00009 0.00054 0.00063 — 6.44662 6.44662 0.00014 0.00104 0.00526 6.76507
3.2. Demolition (2029)3.2.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 27 / 87
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.39408 0.36242 2.49975 14.6248 0.02392 0.06307 — 0.06307 0.06141 — 0.06141 — 2,492.95 2,492.95 0.10112 0.02022 — 2,501.51 Demolition
— — — — — — 0.56799 0.56799 — 0.08601 0.08601 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.02391 0.02199 0.15165 0.88722 0.00145 0.00383 — 0.00383 0.00373 — 0.00373 — 151.236 151.236 0.00613 0.00123 — 151.755 Demolition
— — — — — — 0.03446 0.03446 — 0.00522 0.00522 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00436 0.00401 0.02768 0.16192 0.00026 0.00070 — 0.00070 0.00068 — 0.00068 — 25.0388 25.0388 0.00102 0.00020 — 25.1247 Demolition
— — — — — — 0.00629 0.00629 — 0.00095 0.00095 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 28 / 87
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.04685 0.04065 0.04960 0.54372 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 148.445 148.445 0.00220 0.00620 0.01174 150.360Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.01167 0.00519 0.31058 0.10127 0.00158 0.00288 0.05913 0.06201 0.00288 0.01658 0.01946 — 210.482 210.482 0.00461 0.03328 0.00970 220.524AverageDaily ——————————————————
Worker 0.00281 0.00243 0.00267 0.03319 0.00000 0.00000 0.00977 0.00977 0.00000 0.00229 0.00229 — 9.07097 9.07097 0.00013 0.00036 0.01185 9.19328Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00073 0.00033 0.01877 0.00606 0.00010 0.00017 0.00355 0.00372 0.00017 0.00100 0.00117 — 12.7635 12.7635 0.00028 0.00202 0.00980 13.3818Annual — — — — — — — — — — — — — — — — — —Worker 0.00051 0.00044 0.00049 0.00606 0.00000 0.00000 0.00178 0.00178 0.00000 0.00042 0.00042 — 1.50180 1.50180 0.00002 0.00006 0.00196 1.52205Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00013 0.00006 0.00343 0.00111 0.00002 0.00003 0.00065 0.00068 0.00003 0.00018 0.00021 — 2.11314 2.11314 0.00005 0.00033 0.00162 2.21552
3.2.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.39408 0.36242 2.49975 14.6248 0.02392 0.06307 — 0.06307 0.06141 — 0.06141 — 2,492.95 2,492.95 0.10112 0.02022 — 2,501.51 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 29 / 87
Demoliti — — — — — — 0.56799 0.56799 — 0.08601 0.08601 ——————— Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.02391 0.02199 0.15165 0.88722 0.00145 0.00383 — 0.00383 0.00373 — 0.00373 — 151.236 151.236 0.00613 0.00123 — 151.755 Demolition
— — — — — — 0.03446 0.03446 — 0.00522 0.00522 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00436 0.00401 0.02768 0.16192 0.00026 0.00070 — 0.00070 0.00068 — 0.00068 — 25.0388 25.0388 0.00102 0.00020 — 25.1247 Demolition
— — — — — — 0.00629 0.00629 — 0.00095 0.00095 ———————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Daily,Winter(Max)
——————————————————
Worker 0.04685 0.04065 0.04960 0.54372 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 148.445 148.445 0.00220 0.00620 0.01174 150.360Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 30 / 87
Hauling 0.01167 0.00519 0.31058 0.10127 0.00158 0.00288 0.05913 0.06201 0.00288 0.01658 0.01946 — 210.482 210.482 0.00461 0.03328 0.00970 220.524 AverageDaily
——————————————————
Worker 0.00281 0.00243 0.00267 0.03319 0.00000 0.00000 0.00977 0.00977 0.00000 0.00229 0.00229 — 9.07097 9.07097 0.00013 0.00036 0.01185 9.19328Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00073 0.00033 0.01877 0.00606 0.00010 0.00017 0.00355 0.00372 0.00017 0.00100 0.00117 — 12.7635 12.7635 0.00028 0.00202 0.00980 13.3818Annual — — — — — — — — — — — — — — — — — —Worker 0.00051 0.00044 0.00049 0.00606 0.00000 0.00000 0.00178 0.00178 0.00000 0.00042 0.00042 — 1.50180 1.50180 0.00002 0.00006 0.00196 1.52205Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00013 0.00006 0.00343 0.00111 0.00002 0.00003 0.00065 0.00068 0.00003 0.00018 0.00021 — 2.11314 2.11314 0.00005 0.00033 0.00162 2.21552
3.3. Building Construction (2029)3.3.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 — 0.10948 0.10235 — 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 — 0.10948 0.10235 — 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 31 / 87
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
— 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Onsite truck
AverageDaily
——————————————————
Off-RoadEquipment
0.48028 0.40848 3.22816 7.40556 0.01270 0.07156 — 0.07156 0.06690 — 0.06690 — 1,177.17 1,177.17 0.04775 0.00955 — 1,181.21 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.08765 0.07455 0.58914 1.35151 0.00232 0.01306 — 0.01306 0.01221 — 0.01221 — 194.893 194.893 0.00791 0.00158 — 195.562 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.09760 0.09588 0.07876 1.25219 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 321.605 321.605 0.00400 0.01227 0.93763 326.299Vendor 0.01713 0.00854 0.41457 0.13581 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 373.977 373.977 0.00474 0.05572 0.72058 391.419Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.09702 0.08418 0.10273 1.12606 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 307.436 307.436 0.00457 0.01284 0.02431 311.401Vendor 0.01655 0.00824 0.43205 0.13991 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 374.192 374.192 0.00474 0.05572 0.01863 390.932Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 32 / 87
AverageDaily
——————————————————
Worker 0.06267 0.05428 0.05950 0.74068 0.00000 0.00000 0.21796 0.21796 0.00000 0.05104 0.05104 — 202.408 202.408 0.00298 0.00802 0.26448 205.137Vendor 0.01101 0.00539 0.28030 0.08992 0.00195 0.00195 0.07324 0.07519 0.00195 0.02026 0.02221 — 244.498 244.498 0.00310 0.03642 0.20289 255.631Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.01144 0.00991 0.01086 0.13517 0.00000 0.00000 0.03978 0.03978 0.00000 0.00931 0.00931 — 33.5109 33.5109 0.00049 0.00133 0.04379 33.9627Vendor 0.00201 0.00098 0.05115 0.01641 0.00036 0.00036 0.01337 0.01372 0.00036 0.00370 0.00405 — 40.4794 40.4794 0.00051 0.00603 0.03359 42.3226Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 — 0.10948 0.10235 — 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.73481 0.62494 4.93889 11.3301 0.01942 0.10948 — 0.10948 0.10235 — 0.10235 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 33 / 87
Off-RoaEquipment
0.48028 0.40848 3.22816 7.40556 0.01270 0.07156 — 0.07156 0.06690 — 0.06690 — 1,177.17 1,177.17 0.04775 0.00955 — 1,181.21 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.08765 0.07455 0.58914 1.35151 0.00232 0.01306 — 0.01306 0.01221 — 0.01221 — 194.893 194.893 0.00791 0.00158 — 195.562 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.09760 0.09588 0.07876 1.25219 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 321.605 321.605 0.00400 0.01227 0.93763 326.299Vendor 0.01713 0.00854 0.41457 0.13581 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 373.977 373.977 0.00474 0.05572 0.72058 391.419Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.09702 0.08418 0.10273 1.12606 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 307.436 307.436 0.00457 0.01284 0.02431 311.401Vendor 0.01655 0.00824 0.43205 0.13991 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 374.192 374.192 0.00474 0.05572 0.01863 390.932Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.06267 0.05428 0.05950 0.74068 0.00000 0.00000 0.21796 0.21796 0.00000 0.05104 0.05104 — 202.408 202.408 0.00298 0.00802 0.26448 205.137Vendor 0.01101 0.00539 0.28030 0.08992 0.00195 0.00195 0.07324 0.07519 0.00195 0.02026 0.02221 — 244.498 244.498 0.00310 0.03642 0.20289 255.631Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 34 / 87
Annual — — — — — — — — — — — — — — — — — —
Worker 0.01144 0.00991 0.01086 0.13517 0.00000 0.00000 0.03978 0.03978 0.00000 0.00931 0.00931 — 33.5109 33.5109 0.00049 0.00133 0.04379 33.9627Vendor 0.00201 0.00098 0.05115 0.01641 0.00036 0.00036 0.01337 0.01372 0.00036 0.00370 0.00405 — 40.4794 40.4794 0.00051 0.00603 0.03359 42.3226Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Building Construction (2030)3.4.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 — 0.10056 0.09414 — 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 — 0.10056 0.09414 — 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.50891 0.43320 3.49553 8.07706 0.01387 0.07183 — 0.07183 0.06724 — 0.06724 — 1,286.42 1,286.42 0.05218 0.01044 — 1,290.84 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 35 / 87
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.09288 0.07906 0.63793 1.47406 0.00253 0.01311 — 0.01311 0.01227 — 0.01227 — 212.982 212.982 0.00864 0.00173 — 213.713 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.09360 0.08133 0.07819 1.17856 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 316.202 316.202 0.00400 0.01227 0.83647 320.795Vendor 0.01356 0.00854 0.39405 0.13225 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 362.444 362.444 0.00474 0.05273 0.63104 378.909Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.09303 0.08019 0.09103 1.05899 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 302.289 302.289 0.00457 0.01227 0.02174 306.082Vendor 0.01327 0.00795 0.40884 0.13663 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 362.672 362.672 0.00474 0.05273 0.01637 378.522Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.06563 0.05646 0.06421 0.76234 0.00000 0.00000 0.23819 0.23819 0.00000 0.05578 0.05578 — 217.490 217.490 0.00285 0.00876 0.25776 220.431Vendor 0.00990 0.00589 0.29186 0.09592 0.00213 0.00213 0.08004 0.08217 0.00213 0.02214 0.02427 — 258.957 258.957 0.00338 0.03767 0.19492 270.462Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.01198 0.01030 0.01172 0.13913 0.00000 0.00000 0.04347 0.04347 0.00000 0.01018 0.01018 — 36.0079 36.0079 0.00047 0.00145 0.04267 36.4948 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 36 / 87
Vendor 0.00181 0.00107 0.05326 0.01751 0.00039 0.00039 0.01461 0.01500 0.00039 0.00404 0.00443 — 42.8733 42.8733 0.00056 0.00624 0.03227 44.7780 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 — 0.10056 0.09414 — 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.71247 0.60649 4.89375 11.3079 0.01942 0.10056 — 0.10056 0.09414 — 0.09414 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.17 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.50891 0.43320 3.49553 8.07706 0.01387 0.07183 — 0.07183 0.06724 — 0.06724 — 1,286.42 1,286.42 0.05218 0.01044 — 1,290.84 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 37 / 87
213.713
— 0.00173 0.00864 212.982 212.982
— 0.01227
— 0.01227 0.01311
— 0.01311 0.00253 1.47406 0.63793 0.07906 0.09288 Off-Roa dEquipm
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.09360 0.08133 0.07819 1.17856 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 316.202 316.202 0.00400 0.01227 0.83647 320.795Vendor 0.01356 0.00854 0.39405 0.13225 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 362.444 362.444 0.00474 0.05273 0.63104 378.909Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.09303 0.08019 0.09103 1.05899 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 302.289 302.289 0.00457 0.01227 0.02174 306.082Vendor 0.01327 0.00795 0.40884 0.13663 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 362.672 362.672 0.00474 0.05273 0.01637 378.522Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.06563 0.05646 0.06421 0.76234 0.00000 0.00000 0.23819 0.23819 0.00000 0.05578 0.05578 — 217.490 217.490 0.00285 0.00876 0.25776 220.431Vendor 0.00990 0.00589 0.29186 0.09592 0.00213 0.00213 0.08004 0.08217 0.00213 0.02214 0.02427 — 258.957 258.957 0.00338 0.03767 0.19492 270.462Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.01198 0.01030 0.01172 0.13913 0.00000 0.00000 0.04347 0.04347 0.00000 0.01018 0.01018 — 36.0079 36.0079 0.00047 0.00145 0.04267 36.4948Vendor 0.00181 0.00107 0.05326 0.01751 0.00039 0.00039 0.01461 0.01500 0.00039 0.00404 0.00443 — 42.8733 42.8733 0.00056 0.00624 0.03227 44.7780Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 38 / 87
3.5. Building Construction (2031)3.5.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.69558 0.59253 4.85617 11.2912 0.01942 0.09315 — 0.09315 0.08733 — 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.18 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.69558 0.59253 4.85617 11.2912 0.01942 0.09315 — 0.09315 0.08733 — 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.18 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.37161 0.31656 2.59439 6.03231 0.01038 0.04977 — 0.04977 0.04665 — 0.04665 — 962.175 962.175 0.03903 0.00781 — 965.477 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.06782 0.05777 0.47348 1.10090 0.00189 0.00908 — 0.00908 0.00851 — 0.00851 — 159.299 159.299 0.00646 0.00129 — 159.846 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 39 / 87
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.08903 0.07733 0.06649 1.09438 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 311.193 311.193 0.00342 0.00171 0.74286 312.531Vendor 0.01356 0.00854 0.37651 0.12897 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 350.382 350.382 0.00474 0.05273 0.55003 366.766Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.08903 0.07676 0.07990 0.99193 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 297.516 297.516 0.00400 0.01227 0.01933 301.292Vendor 0.01298 0.00795 0.39189 0.13336 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 350.621 350.621 0.00474 0.05273 0.01420 366.468Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.04726 0.04071 0.04208 0.52963 0.00000 0.00000 0.17815 0.17815 0.00000 0.04172 0.04172 — 160.099 160.099 0.00213 0.00656 0.17182 162.278Vendor 0.00709 0.00440 0.20733 0.07000 0.00159 0.00159 0.05987 0.06146 0.00159 0.01656 0.01815 — 187.244 187.244 0.00253 0.02817 0.12642 195.830Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00863 0.00743 0.00768 0.09666 0.00000 0.00000 0.03251 0.03251 0.00000 0.00761 0.00761 — 26.5062 26.5062 0.00035 0.00109 0.02845 26.8669Vendor 0.00129 0.00080 0.03784 0.01277 0.00029 0.00029 0.01093 0.01122 0.00029 0.00302 0.00331 — 31.0004 31.0004 0.00042 0.00466 0.02093 32.4218Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 40 / 87
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.69558 0.59253 4.85617 11.2912 0.01942 0.09315 — 0.09315 0.08733 — 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.18 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.69558 0.59253 4.85617 11.2912 0.01942 0.09315 — 0.09315 0.08733 — 0.08733 — 1,800.99 1,800.99 0.07306 0.01461 — 1,807.18 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.37161 0.31656 2.59439 6.03231 0.01038 0.04977 — 0.04977 0.04665 — 0.04665 — 962.175 962.175 0.03903 0.00781 — 965.477 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.06782 0.05777 0.47348 1.10090 0.00189 0.00908 — 0.00908 0.00851 — 0.00851 — 159.299 159.299 0.00646 0.00129 — 159.846 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.5.4. Offsite - Mitigated
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 41 / 87
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.08903 0.07733 0.06649 1.09438 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 311.193 311.193 0.00342 0.00171 0.74286 312.531Vendor 0.01356 0.00854 0.37651 0.12897 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 350.382 350.382 0.00474 0.05273 0.55003 366.766Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.08903 0.07676 0.07990 0.99193 0.00000 0.00000 0.33838 0.33838 0.00000 0.07932 0.07932 — 297.516 297.516 0.00400 0.01227 0.01933 301.292Vendor 0.01298 0.00795 0.39189 0.13336 0.00298 0.00298 0.11345 0.11643 0.00298 0.03134 0.03433 — 350.621 350.621 0.00474 0.05273 0.01420 366.468Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.04726 0.04071 0.04208 0.52963 0.00000 0.00000 0.17815 0.17815 0.00000 0.04172 0.04172 — 160.099 160.099 0.00213 0.00656 0.17182 162.278Vendor 0.00709 0.00440 0.20733 0.07000 0.00159 0.00159 0.05987 0.06146 0.00159 0.01656 0.01815 — 187.244 187.244 0.00253 0.02817 0.12642 195.830Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00863 0.00743 0.00768 0.09666 0.00000 0.00000 0.03251 0.03251 0.00000 0.00761 0.00761 — 26.5062 26.5062 0.00035 0.00109 0.02845 26.8669Vendor 0.00129 0.00080 0.03784 0.01277 0.00029 0.00029 0.01093 0.01122 0.00029 0.00302 0.00331 — 31.0004 31.0004 0.00042 0.00466 0.02093 32.4218Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6. Paving (2031)3.6.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 42 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
Off-RoadEquipment
0.23948 0.21303 1.44403 6.87734 0.00940 0.05111 — 0.05111 0.04827 — 0.04827 — 991.087 991.087 0.04020 0.00804 — 994.488 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23948 0.21303 1.44403 6.87734 0.00940 0.05111 — 0.05111 0.04827 — 0.04827 — 991.087 991.087 0.04020 0.00804 — 994.488 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.05839 0.05194 0.35211 1.67694 0.00229 0.01246 — 0.01246 0.01177 — 0.01177 — 241.662 241.662 0.00980 0.00196 — 242.492 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01066 0.00948 0.06426 0.30604 0.00042 0.00227 — 0.00227 0.00215 — 0.00215 — 40.0100 40.0100 0.00162 0.00032 — 40.1473 Paving 0.00000 0.00000 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 43 / 87
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
— 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Onsite truck
3.6.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.04299 0.03734 0.03210 0.52842 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 150.259 150.259 0.00165 0.00083 0.35869 150.905Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.04299 0.03707 0.03858 0.47895 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 143.656 143.656 0.00193 0.00592 0.00933 145.479Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01042 0.00897 0.00927 0.11672 0.00000 0.00000 0.03926 0.03926 0.00000 0.00919 0.00919 — 35.2822 35.2822 0.00047 0.00144 0.03786 35.7624Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00190 0.00164 0.00169 0.02130 0.00000 0.00000 0.00717 0.00717 0.00000 0.00168 0.00168 — 5.84137 5.84137 0.00008 0.00024 0.00627 5.92087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 44 / 87
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.23948 0.21303 1.44403 6.87734 0.00940 0.05111 — 0.05111 0.04827 — 0.04827 — 991.087 991.087 0.04020 0.00804 — 994.488 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.23948 0.21303 1.44403 6.87734 0.00940 0.05111 — 0.05111 0.04827 — 0.04827 — 991.087 991.087 0.04020 0.00804 — 994.488 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.05839 0.05194 0.35211 1.67694 0.00229 0.01246 — 0.01246 0.01177 — 0.01177 — 241.662 241.662 0.00980 0.00196 — 242.492 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01066 0.00948 0.06426 0.30604 0.00042 0.00227 — 0.00227 0.00215 — 0.00215 — 40.0100 40.0100 0.00162 0.00032 — 40.1473 Paving 0.00000 0.00000 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 45 / 87
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.6.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.04299 0.03734 0.03210 0.52842 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 150.259 150.259 0.00165 0.00083 0.35869 150.905Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.04299 0.03707 0.03858 0.47895 0.00000 0.00000 0.16339 0.16339 0.00000 0.03830 0.03830 — 143.656 143.656 0.00193 0.00592 0.00933 145.479Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01042 0.00897 0.00927 0.11672 0.00000 0.00000 0.03926 0.03926 0.00000 0.00919 0.00919 — 35.2822 35.2822 0.00047 0.00144 0.03786 35.7624Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00190 0.00164 0.00169 0.02130 0.00000 0.00000 0.00717 0.00717 0.00000 0.00168 0.00168 — 5.84137 5.84137 0.00008 0.00024 0.00627 5.92087Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7. Architectural Coating (2031)
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 46 / 87
3.7.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
2.90759 2.90759 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
2.90759 2.90759 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04079 0.03371 0.27458 0.38999 0.00061 0.00333 — 0.00333 0.00306 — 0.00306 — 47.1884 47.1884 0.00191 0.00038 — 47.3504 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 47 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— 1.02761 1.02761 Architect
ural
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00744 0.00615 0.05011 0.07117 0.00011 0.00061 — 0.00061 0.00056 — 0.00056 — 7.81258 7.81258 0.00032 0.00006 — 7.83939 ArchitecturalCoatings
0.18754 0.18754 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Worker 0.01781 0.01547 0.01330 0.21888 0.00000 0.00000 0.06768 0.06768 0.00000 0.01586 0.01586 — 62.2385 62.2385 0.00068 0.00034 0.14857 62.5063Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01781 0.01535 0.01598 0.19839 0.00000 0.00000 0.06768 0.06768 0.00000 0.01586 0.01586 — 59.5033 59.5033 0.00080 0.00245 0.00387 60.2585Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 48 / 87
Worker 0.00625 0.00539 0.00557 0.07007 0.00000 0.00000 0.02357 0.02357 0.00000 0.00552 0.00552 — 21.1823 21.1823 0.00028 0.00087 0.02273 21.4706 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00114 0.00098 0.00102 0.01279 0.00000 0.00000 0.00430 0.00430 0.00000 0.00101 0.00101 — 3.50698 3.50698 0.00005 0.00014 0.00376 3.55470Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 ArchitecturalCoatings
2.90759 2.90759 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.11542 0.09539 0.77690 1.10346 0.00173 0.00943 — 0.00943 0.00867 — 0.00867 — 133.518 133.518 0.00542 0.00108 — 133.976 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 49 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— 2.90759 2.90759 Architect
uralCoatings
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.04079 0.03371 0.27458 0.38999 0.00061 0.00333 — 0.00333 0.00306 — 0.00306 — 47.1884 47.1884 0.00191 0.00038 — 47.3504 ArchitecturalCoatings
1.02761 1.02761 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00744 0.00615 0.05011 0.07117 0.00011 0.00061 — 0.00061 0.00056 — 0.00056 — 7.81258 7.81258 0.00032 0.00006 — 7.83939 ArchitecturalCoatings
0.18754 0.18754 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.7.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 50 / 87
Worker 0.01781 0.01547 0.01330 0.21888 0.00000 0.00000 0.06768 0.06768 0.00000 0.01586 0.01586 — 62.2385 62.2385 0.00068 0.00034 0.14857 62.5063 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01781 0.01535 0.01598 0.19839 0.00000 0.00000 0.06768 0.06768 0.00000 0.01586 0.01586 — 59.5033 59.5033 0.00080 0.00245 0.00387 60.2585Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00625 0.00539 0.00557 0.07007 0.00000 0.00000 0.02357 0.02357 0.00000 0.00552 0.00552 — 21.1823 21.1823 0.00028 0.00087 0.02273 21.4706Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00114 0.00098 0.00102 0.01279 0.00000 0.00000 0.00430 0.00430 0.00000 0.00101 0.00101 — 3.50698 3.50698 0.00005 0.00014 0.00376 3.55470Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details4.1. Mobile Emissions by Land Use4.1.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 51 / 87
15,012.8 33.2874 0.58353 0.55023 14,791.8 14,791.8
— 3.88527 3.80455 0.08072 15.0888 15.0026 0.08618 0.14520 52.8988 5.13908 6.89882 7.46604 Govern ment
Total 7.46604 6.89882 5.13908 52.8988 0.14520 0.08618 15.0026 15.0888 0.08072 3.80455 3.88527 — 14,791.8 14,791.8 0.55023 0.58353 33.2874 15,012.8Daily,Winter(Max) ——————————————————
Government(CivicCenter)
7.42013 6.83751 5.73889 51.6945 0.14018 0.08622 15.0026 15.0889 0.08076 3.80455 3.88531 — 14,283.4 14,283.4 0.59125 0.62291 0.86312 14,484.7 Total 7.42013 6.83751 5.73889 51.6945 0.14018 0.08622 15.0026 15.0889 0.08076 3.80455 3.88531 — 14,283.4 14,283.4 0.59125 0.62291 0.86312 14,484.7Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter)
0.95878 0.88368 0.73282 6.64590 0.01838 0.01124 1.92730 1.93853 0.01053 0.48885 0.49937 — 1,698.52 1,698.52 0.06802 0.07252 1.69976 1,723.53 Total 0.95878 0.88368 0.73282 6.64590 0.01838 0.01124 1.92730 1.93853 0.01053 0.48885 0.49937 — 1,698.52 1,698.52 0.06802 0.07252 1.69976 1,723.53
4.1.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
6.61499 6.11243 4.55327 46.8688 0.12865 0.07635 13.2925 13.3688 0.07152 3.37087 3.44239 — 13,105.7 13,105.7 0.48751 0.51701 29.4930 13,301.5 Total 6.61499 6.11243 4.55327 46.8688 0.12865 0.07635 13.2925 13.3688 0.07152 3.37087 3.44239 — 13,105.7 13,105.7 0.48751 0.51701 29.4930 13,301.5Daily,Winter(Max) ——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 52 / 87
12,833.6 0.76473 0.55191 0.52385 12,655.3 12,655.3
— 3.44243 3.37087 0.07156 13.3689 13.2925 0.07639 0.12420 45.8018 5.08472 6.05810 6.57431 Govern ment(CivicCenter)
Total 6.57431 6.05810 5.08472 45.8018 0.12420 0.07639 13.2925 13.3689 0.07156 3.37087 3.44243 — 12,655.3 12,655.3 0.52385 0.55191 0.76473 12,833.6Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter)
0.84949 0.78295 0.64929 5.88833 0.01628 0.00996 1.70760 1.71756 0.00933 0.43313 0.44245 — 1,504.91 1,504.91 0.06027 0.06425 1.50600 1,527.07 Total 0.84949 0.78295 0.64929 5.88833 0.01628 0.00996 1.70760 1.71756 0.00933 0.43313 0.44245 — 1,504.91 1,504.91 0.06027 0.06425 1.50600 1,527.07
4.2. Energy4.2.1. Electricity Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
— — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14 Total — — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14 Total — — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14Annual — — — — — — — — — — — — — — — — — — Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 53 / 87
Govern(CivicCenter)
— — — — — — — — — — — — 169.078 169.078 0.02140 0.00259 — 170.386 Total — — — — — — — — — — — — 169.078 169.078 0.02140 0.00259 — 170.386
4.2.2. Electricity Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
— — — — — — — — — — — — 1,022.86 1,022.86 0.12943 0.01569 — 1,030.77 Total — — — — — — — — — — — — 1,022.86 1,022.86 0.12943 0.01569 — 1,030.77Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14 Total — — — — — — — — — — — — 1,021.24 1,021.24 0.12923 0.01566 — 1,029.14Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — — 169.211 169.211 0.02141 0.00260 — 170.519 Total — — — — — — — — — — — — 169.211 169.211 0.02141 0.00260 — 170.519
4.2.3. Natural Gas Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 54 / 87
LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Government(CivicCenter)
0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305 Total 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305Daily,Winter(Max) ——————————————————
Government(CivicCenter)
0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305 Total 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter)
0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 113.972 113.972 0.01009 0.00021 — 114.288 Total 0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 113.972 113.972 0.01009 0.00021 — 114.288
4.2.4. Natural Gas Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 55 / 87
Total 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305 Daily,Winter(Max)
——————————————————
Government(CivicCenter)
0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305 Total 0.06346 0.03173 0.57695 0.48464 0.00346 0.04385 — 0.04385 0.04385 — 0.04385 — 688.396 688.396 0.06092 0.00130 — 690.305Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter)
0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 113.972 113.972 0.01009 0.00021 — 114.288 Total 0.01158 0.00579 0.10529 0.08845 0.00063 0.00800 — 0.00800 0.00800 — 0.00800 — 113.972 113.972 0.01009 0.00021 — 114.288
4.3. Area Emissions by Source4.3.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
ConsumerProducts
1.73126 1.73126 ————————————————
ArchitecturalCoatings
0.10276 0.10276 ————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 56 / 87
14.5209
— 0.00012 0.00061 14.4687 14.4687
— 0.00472
— 0.00472 0.00625
— 0.00625 0.00021 3.51855 0.02961 0.57823 0.62652 Landsca peEquipment
Total 2.46054 2.41226 0.02961 3.51855 0.00021 0.00625 — 0.00625 0.00472 — 0.00472 — 14.4687 14.4687 0.00061 0.00012 — 14.5209Daily,Winter(Max) ——————————————————
ConsumerProducts
1.73126 1.73126 ————————————————
ArchitecturalCoatings
0.10276 0.10276 ————————————————
Total 1.83402 1.83402 ————————————————Annual — — — — — — — — — — — — — — — — — —ConsumerProducts
0.31595 0.31595 ————————————————
ArchitecturalCoatings
0.01875 0.01875 ————————————————
LandscapeEquipment
0.05639 0.05204 0.00266 0.31667 0.00002 0.00056 — 0.00056 0.00043 — 0.00043 — 1.18132 1.18132 0.00005 0.00001 — 1.18558 Total 0.39110 0.38675 0.00266 0.31667 0.00002 0.00056 — 0.00056 0.00043 — 0.00043 — 1.18132 1.18132 0.00005 0.00001 — 1.18558
4.3.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 57 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Summer(Max)
ConsumerProducts
1.73126 1.73126 ————————————————
ArchitecturalCoatings
0.02055 0.02055 ————————————————
Total 1.75181 1.75181 ————————————————Daily,Winter(Max) ——————————————————
ConsumerProducts
1.73126 1.73126 ————————————————
ArchitecturalCoatings
0.02055 0.02055 ————————————————
Total 1.75181 1.75181 ————————————————Annual — — — — — — — — — — — — — — — — — —ConsumerProducts
0.31595 0.31595 ————————————————
ArchitecturalCoatings
0.00375 0.00375 ————————————————
Total 0.31971 0.31971 ————————————————
4.4. Water Emissions by Land Use
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 58 / 87
4.4.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
— — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925 Total — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925 Total — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210 Total — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210
4.4.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 59 / 87
Govern(CivicCenter)
— — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925 Total — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925 Total — — — — — — — — — — — 30.7969 78.2171 109.014 3.16777 0.07623 — 210.925Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210 Total — — — — — — — — — — — 5.09878 12.9497 18.0485 0.52446 0.01262 — 34.9210
4.5. Waste Emissions by Land Use4.5.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
——————————— 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Total — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 60 / 87
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— Daily,
Winter(Max)
Government(CivicCenter)
——————————— 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Total — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954 Total — — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954
4.5.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
——————————— 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Total — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490Daily,Winter(Max) ——————————————————
Government(CivicCenter)
——————————— 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Total — — — — — — — — — — — 248.521 0.00000 248.521 24.8388 0.00000 — 869.490 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 61 / 87
Annual — — — — — — — — — — — — — — — — — —
Government(CivicCenter)
— — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954 Total — — — — — — — — — — — 41.1455 0.00000 41.1455 4.11234 0.00000 — 143.954
4.6. Refrigerant Emissions by Land Use4.6.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
— — — — — — — — — — — — — — — — 0.19675 0.19675
Total — — — — — — — — — — — — — — — — 0.19675 0.19675Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — — — — — — 0.19675 0.19675
Total — — — — — — — — — — — — — — — — 0.19675 0.19675Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — — — — — — 0.03257 0.03257
Total — — — — — — — — — — — — — — — — 0.03257 0.03257
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 62 / 87
4.6.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Government(CivicCenter)
— — — — — — — — — — — — — — — — 0.19675 0.19675
Total — — — — — — — — — — — — — — — — 0.19675 0.19675Daily,Winter(Max) ——————————————————
Government(CivicCenter)
— — — — — — — — — — — — — — — — 0.19675 0.19675
Total — — — — — — — — — — — — — — — — 0.19675 0.19675Annual — — — — — — — — — — — — — — — — — —Government(CivicCenter) — — — — — — — — — — — — — — — — 0.03257 0.03257
Total — — — — — — — — — — — — — — — — 0.03257 0.03257
4.7. Offroad Emissions By Equipment Type4.7.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 63 / 87
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.7.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type4.8.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 64 / 87
CO2e
R N2O CH4 CO2T NBCO2 BCO2 PM2.5T PM2.5D PM2.5E PM10T PM10D PM10E SO2 CO NOx ROG TOG Equipm ent
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type4.9.1. Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 65 / 87
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 66 / 87
4.10.1. Soil Carbon Accumulation By Vegetation Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 67 / 87
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 68 / 87
Remove — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — — Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 69 / 87
Total — — — — — — — — — — — — — — — — — —
4.10.6. Avoided and Sequestered Emissions by Species - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
Daily,Summer(Max)
——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided —————————————————— Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 70 / 87
Subtotal — — — — — — — — — — — — — — — — — —
Sequestered
——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
5. Activity Data5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase DescriptionDemolition Demolition 10/1/2028 1/31/2029 5.00000 88.0000 —Building Construction Building Construction 02/01/2029 9/30/2031 5.00000 694.000 —Paving Paving 07/01/2031 10/31/2031 5.00000 89.0000 —Architectural Coating Architectural Coating 07/01/2031 12/28/2031 5.00000 129.000 —
5.2. Off-Road Equipment5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorDemolition Concrete/Industrial Saws
Diesel Average 1.000000 8.00000 33.0000 0.73000
Demolition Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Demolition Tractors/Loaders/Back hoes
Diesel Tier 4 Final 3.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 6.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 1.000000 6.00000 82.0000 0.20000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 71 / 87
Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Tractors/Loaders/Back
hoes
Diesel Tier 4 Final 1.000000 6.00000 84.0000 0.37000
Building Construction Welders Diesel Average 3.00000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 1.000000 6.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 6.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 1.000000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 1.000000 7.00000 36.0000 0.38000Paving Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorDemolition Concrete/Industrial Saws
Diesel Average 1.000000 8.00000 33.0000 0.73000
Demolition Rubber Tired Dozers Diesel Tier 4 Final 1.000000 8.00000 367.000 0.40000Demolition Tractors/Loaders/Back hoes
Diesel Tier 4 Final 3.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Tier 4 Final 1.000000 6.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 1.000000 6.00000 82.0000 0.20000Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000Building Construction Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 6.00000 84.0000 0.37000
Building Construction Welders Diesel Average 3.00000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 1.000000 6.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 6.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 1.000000 8.00000 89.0000 0.36000Paving Rollers Diesel Average 1.000000 7.00000 36.0000 0.38000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 72 / 87
Paving Tractors/Loaders/Back Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000 Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.3. Construction Vehicles5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixDemolition Worker 12.5000 18.5000 LDA,LDT1,LDT2Demolition Vendor — 10.2000 HHDT,MHDTDemolition Hauling 6.53409 10.00000 HHDTDemolition Onsite truck — — HHDTBuilding Construction Worker 25.8880 18.5000 LDA,LDT1,LDT2Building Construction Vendor 13.2595 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 12.5000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 5.17760 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixDemolition Worker 12.5000 18.5000 LDA,LDT1,LDT2Demolition Vendor — 10.2000 HHDT,MHDT Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 73 / 87
Demolition Hauling 6.53409 10.00000 HHDT
Demolition Onsite truck — — HHDTBuilding Construction Worker 25.8880 18.5000 LDA,LDT1,LDT2Building Construction Vendor 13.2595 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 12.5000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 5.17760 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.4. Vehicles5.4.1. Construction Vehicle Control StrategiesNon-applicable. No control strategies activated by user.5.5. Architectural Coatings Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior AreaCoated (sq ft)
Non-Residential Interior AreaCoated (sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 121,350 40,450.0 —
5.6. Dust Mitigation5.6.1. Construction Earthmoving Activities Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 74 / 87
Acres Paved (acres) Acres Graded (acres) Material Exported (cy) Material Imported (cy) Phase Name Material Demolished (Building Square Footage)
Demolition 0.00000 0.00000 0.00000 50,000.0 0.00000Paving 0.00000 0.00000 0.00000 0.00000 0.00000
5.6.2. Construction Earthmoving Control StrategiesNon-applicable. No control strategies activated by user.5.7. Construction Paving Phase Name Land Use Area Paved (acres) % AsphaltPaving Government (Civic Center) 0.00000 0%
5.8. Construction Electricity Consumption and Emissions FactorskWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O2028 0.00000 346.196 0.03300 0.004002029 0.00000 346.196 0.03300 0.004002030 0.00000 260.788 0.03300 0.004002031 0.00000 260.788 0.03300 0.00400
5.9. Operational Mobile Sources5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearGovernment (CivicCenter) 1,961.02 0.00000 0.00000 511,265 21,249.6 0.00000 0.00000 5,540,062
5.9.2. Mitigated
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 75 / 87
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Government (CivicCenter)
1,737.48 0.00000 0.00000 452,986 18,827.3 0.00000 0.00000 4,908,551
5.10. Operational Area Sources5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number)Government (Civic Center) Wood Fireplaces 0 0Government (Civic Center) Gas Fireplaces 0 0Government (Civic Center) Propane Fireplaces 0 0Government (Civic Center) Electric Fireplaces 0 0Government (Civic Center) No Fireplaces 0 0Government (Civic Center) Conventional Wood Stoves 0 0Government (Civic Center) Catalytic Wood Stoves 0 0Government (Civic Center) Non-Catalytic Wood Stoves 0 0Government (Civic Center) Pellet Wood Stoves 0 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sqft)
Residential Exterior Area Coated (sqft)
Non-Residential Interior Area Coated(sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
0.00000 0.00000 121,350 40,450.0 —
5.10.3. Landscape Equipment
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 76 / 87
5.10.4. Landscape Equipment - Mitigated
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.11. Operational Energy Consumption5.11.1. UnmitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Government (Civic Center) 1,429,335 260.788 0.0330 0.0040 2,147,980
5.11.2. MitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Government (Civic Center) 1,429,335 260.788 0.0330 0.0040 2,147,980
5.12. Operational Water and Wastewater Consumption5.12.1. Unmitigated Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Government (Civic Center) 16,071,569 12,927.6
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Government (Civic Center) 16,071,569 12,927.6 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 77 / 87
5.13. Operational Waste Generation5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Government (Civic Center) 461.130 0.00000
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Government (Civic Center) 461.130 0.00000
5.14. Operational Refrigeration and Air Conditioning Equipment5.14.1. Unmitigated Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedGovernment (CivicCenter) Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.01679 0.60000 0.00000 1.000000
Government (CivicCenter)
Other commercial A/Cand heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
5.14.2. Mitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedGovernment (CivicCenter) Householdrefrigerators and/orfreezers
R-134a 1,430.00 0.01679 0.60000 0.00000 1.000000
Government (CivicCenter)
Other commercial A/Cand heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
5.15. Operational Off-Road Equipment
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 78 / 87
5.15.1. Unmitigated5.15.2. Mitigated5.16. Stationary Sources5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers5.17. User Defined5.18. Vegetation5.18.1. Land Use Change5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 79 / 87
5.18.2. Sequestration5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report6.1. Climate Risk SummaryCal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 whichassumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location UnitTemperature and Extreme Heat 0.00000 annual days of extreme heatExtreme Precipitation 0.00000 annual days with precipitation above 20 mmSea Level Rise 0.00000 meters of inundation depthWildfire 0.00000 annual hectares burned Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures fromobserved historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall ifreceived over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), andconsider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled withextreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 metersWildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical dataof climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. Thefour simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range ofdifferent rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.6.2. Initial Climate Risk Scores Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 80 / 87
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/AExtreme Precipitation N/A N/A N/A N/ASea Level Rise 1 0 0 N/AWildfire 1 0 0 N/AFlooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 0 0 0 N/A The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reductionmeasures.6.3. Adjusted Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1112Extreme Precipitation N/A N/A N/A N/ASea Level Rise 1 1 1 2Wildfire 1112Flooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 1112 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 81 / 87
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reductionmeasures.
6.4. Climate Risk Reduction Measures7. Health and Equity Details7.1. CalEnviroScreen 4.0 ScoresThe maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census TractExposure Indicators —
AQ-Ozone 59.6889AQ-PM 41.1450AQ-DPM 81.7299Drinking Water 59.7727Lead Risk Housing 33.5854Pesticides 0.00000Toxic Releases 25.9565Traffic 86.6500Effect Indicators —
CleanUp Sites 0.00000Groundwater 22.1152Haz Waste Facilities/Generators 40.1324Impaired Water Bodies 86.9593Solid Waste 52.8981Sensitive Population —
Asthma 14.7931Cardio-vascular 19.4791Low Birth Weights 52.5404Socioeconomic Factor Indicators — Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 82 / 87
Education 71.7540
Housing 87.8834Linguistic 38.1378Poverty 46.6080Unemployment 60.5674
7.2. Healthy Places Index ScoresThe maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census TractEconomic
—
Above Poverty 43.9753625Employed 80.73912486Median HI 26.34415501Education —
Bachelor's or higher 52.44450148High school enrollment 100Preschool enrollment 77.6337739Transportation —
Auto Access 18.65776979Active commuting 53.41973566Social —
2-parent households 9.418709098Voting 62.64596433Neighborhood —
Alcohol availability 21.69896061Park access 81.35506224Retail density 88.31002181Supermarket access 73.66867702 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 83 / 87
Tree canopy 65.52033877
Housing
—
Homeownership 22.10958553Housing habitability 14.59001668Low-inc homeowner severe housing cost burden 6.120877711Low-inc renter severe housing cost burden 37.22571539Uncrowded housing 61.41408957Health Outcomes —
Insured adults 34.59514949Arthritis 45.8Asthma ER Admissions 80.1High Blood Pressure 39.5Cancer (excluding skin) 34.5Asthma 37.3Coronary Heart Disease 43.7Chronic Obstructive Pulmonary Disease 35.3Diagnosed Diabetes 70.5Life Expectancy at Birth 24.2Cognitively Disabled 16.7Physically Disabled 26.6Heart Attack ER Admissions 63.6Mental Health Not Good 43.4Chronic Kidney Disease 55.3Obesity 47.8Pedestrian Injuries 48.7Physical Health Not Good 46.9Stroke 45.2Health Risk Behaviors —
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 84 / 87
Binge Drinking 26.9
Current Smoker 45.9No Leisure Time for Physical Activity 48.0Climate Change Exposures —Wildfire Risk 17.9SLR Inundation Area 0.0Children 64.0Elderly 47.3English Speaking 51.5Foreign-born 55.9Outdoor Workers 82.9Climate Change Adaptive Capacity —Impervious Surface Cover 64.0Traffic Density 94.4Traffic Access 23.0Other Indices —
Hardship 53.4Other Decision Support
—
2016 Voting 69.3
7.3. Overall Health & Equity Scores
Metric Result for Project Census TractCalEnviroScreen 4.0 Score for Project Location (a) 51.0000Healthy Places Index Score for Project Location (b) 47.0000Project Located in a Designated Disadvantaged Community (Senate Bill 535) NoProject Located in a Low-Income Community (Assembly Bill 1550) YesProject Located in a Community Air Protection Program Community (Assembly Bill 617) No Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 85 / 87
a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity MeasuresNo Health & Equity Measures selected.7.5. Evaluation ScorecardHealth & Equity Evaluation Scorecard not completed.7.6. Health & Equity Custom MeasuresNo Health & Equity Custom Measures created.8. User Changes to Default Data8.1. Justifications Screen JustificationConstruction: Construction Phases As per the applicantConstruction: Off-Road Equipment As per MM AQ-1Construction: Trips and VMT As per the applicantOperations: Vehicle Data Based on the Associated Transportation Engineers #24075 Trip Generation Worksheet. Trip credits from existing uses have been taken.
8.4. Construction8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New ValueDemolition Demolition End Date 10/29/2028 1/31/2029Demolition Demolition Work Days per Phase 20.0000 88.0000Building Construction Building Construction Start Date 11/8/2028 02/01/2029Building Construction Building Construction End Date 8/15/2029 9/30/2031Building Construction Building Construction Work Days per Phase 200.000 694.000 Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 86 / 87
Paving Paving Start Date 8/16/2029 07/01/2031
Paving Paving End Date 8/30/2029 10/31/2031Paving Paving Work Days per Phase 10.00000 89.0000Architectural Coating Architectural Coating Start Date 8/31/2029 07/01/2031Architectural Coating Architectural Coating End Date 9/14/2029 12/28/2031Architectural Coating Architectural Coating Work Days per Phase 10.00000 129.000
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New ValueDemolition Rubber Tired Dozers Engine Tier Average Tier 4 FinalDemolition Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalBuilding Construction Cranes Engine Tier Average Tier 4 FinalBuilding Construction Forklifts Engine Tier Average Tier 4 FinalBuilding Construction Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalPaving Pavers Engine Tier Average Tier 4 FinalPaving Paving Equipment Engine Tier Average Tier 4 FinalPaving Tractors/Loaders/Backhoes Engine Tier Average Tier 4 Final
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New ValueDemolition Hauling Miles per Trip 20.0000 10.00000
8.5. Operations8.5.1. Mobile Sources8.5.1.1. Vehicle Data Land Use Model Parameter Units Default Value New Value
Thousand Oaks Downtown Specific Plan: Phase 2C v2 Detailed Report, 4/28/2026 87 / 87
Government (Civic Center) Weekday Trip Rate size/day 33.9800 24.2400 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
1 / 69
TODSP Phase 3 Mitigated Detailed Report
Table of Contents1. Basic Project Information
1.1. Basic Project Information1.2. Land Use Types1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated2.2.2. Onsite Construction Emissions by Year, Unmitigated2.2.3. Offsite Construction Emissions by Year, Unmitigated2.2.4. Total Construction Emissions by Year, Mitigated2.2.5. Onsite Construction Emissions by Year, Mitigated2.2.6. Offsite Construction Emissions by Year, Mitigated
2.3. Operations Emissions Compared Against Thresholds2.4. Operations Emissions by Sector, Unmitigated TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
2 / 69
2.5. Operations Emissions by Sector, Mitigated
3. Construction Emissions Details
3.1. Building Construction (2031)
3.1.1. Onsite - Unmitigated3.1.2. Offsite - Unmitigated3.1.3. Onsite - Mitigated3.1.4. Offsite - Mitigated
3.2. Building Construction (2032)
3.2.1. Onsite - Unmitigated3.2.2. Offsite - Unmitigated3.2.3. Onsite - Mitigated3.2.4. Offsite - Mitigated
3.3. Paving (2032)
3.3.1. Onsite - Unmitigated3.3.2. Offsite - Unmitigated3.3.3. Onsite - Mitigated3.3.4. Offsite - Mitigated
3.4. Architectural Coating (2032)
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
3 / 69
3.4.1. Onsite - Unmitigated3.4.2. Offsite - Unmitigated3.4.3. Onsite - Mitigated3.4.4. Offsite - Mitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated4.1.2. Mitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated4.2.2. Electricity Emissions By Land Use - Mitigated4.2.3. Natural Gas Emissions By Land Use - Unmitigated4.2.4. Natural Gas Emissions By Land Use - Mitigated
4.3. Area Emissions by Source
4.3.1. Unmitigated4.3.2. Mitigated
4.4. Water Emissions by Land Use
4.4.1. Unmitigated
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
4 / 69
4.4.2. Mitigated
4.5. Waste Emissions by Land Use
4.5.1. Unmitigated4.5.2. Mitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated4.6.2. Mitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated4.7.2. Mitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated4.8.2. Mitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated4.9.2. Mitigated
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
5 / 69
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated4.10.6. Avoided and Sequestered Emissions by Species - Mitigated
5. Activity Data
5.1. Construction Schedule5.2. Off-Road Equipment
5.2.1. Unmitigated5.2.2. Mitigated
5.3. Construction Vehicles
5.3.1. Unmitigated5.3.2. Mitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
6 / 69
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving5.8. Construction Electricity Consumption and Emissions Factors5.9. Operational Mobile Sources
5.9.1. Unmitigated5.9.2. Mitigated
5.10. Operational Area Sources
5.10.1. Hearths5.10.2. Architectural Coatings5.10.3. Landscape Equipment5.10.4. Landscape Equipment - Mitigated
5.11. Operational Energy Consumption
5.11.1. Unmitigated5.11.2. Mitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated5.12.2. Mitigated
5.13. Operational Waste Generation
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
7 / 69
5.13.1. Unmitigated5.13.2. Mitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated5.14.2. Mitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated5.15.2. Mitigated
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers
5.17. User Defined5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated5.18.1.2. Mitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
8 / 69
5.18.1.2. Mitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated5.18.2.2. Mitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary6.2. Initial Climate Risk Scores6.3. Adjusted Climate Risk Scores6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores7.2. Healthy Places Index Scores7.3. Overall Health & Equity Scores7.4. Health & Equity Measures7.5. Evaluation Scorecard7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
9 / 69
8.4. Construction
8.4.1. Construction Phases8.4.2. Off-Road Equipment
8.5. Operations
8.5.1. Mobile Sources
8.5.1.1. Vehicle Data
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
10 / 69
1. Basic Project Information1.1. Basic Project Information Data Field ValueProject Name TODSP Phase 3 MitigatedConstruction Start Date 6/1/2031Operational Year 2032Lead Agency —Land Use Scale Project/siteAnalysis Level for Defaults CountyWindspeed (m/s) 2.70000Precipitation (days) 22.6000Location Thousand Oaks, CA, USACounty VenturaCity Thousand OaksAir District Ventura County APCDAir Basin South Central CoastTAZ 3505EDFZ 8Electric Utility Southern California EdisonGas Utility Southern California GasApp Version 2022.1.1.43
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special LandscapeArea (sq ft)
Population Description
Arena 11.2460 1000sqft 3.61479 11,246.0 1,000.000 — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
11 / 69
1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure TitleConstruction C-10-A Water Exposed SurfacesConstruction C-10-B Water Active Demolition SitesConstruction C-10-C Water Unpaved Construction RoadsConstruction C-11 Limit Vehicle Speeds on Unpaved RoadsConstruction C-12 Sweep Paved RoadsTransportation T-7 Implement Commute Trip Reduction MarketingTransportation T-8 Provide Ridesharing ProgramTransportation T-10 Provide End-of-Trip Bicycle FacilitiesArea Sources LL-1 Replace Gas Powered Landscape Equipment with Zero-Emission Landscape Equipment
Area Sources AS-2 Use Low-VOC Paints
2. Emissions Summary2.1. Construction Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Unmit. 3.41944 3.29417 6.23716 26.3733 0.03849 0.17128 0.35128 0.52255 0.16237 0.08300 0.24537 — 4,231.29 4,231.29 0.16145 0.04009 0.71641 4,247.99Mit. 3.41944 3.29417 6.23716 26.3733 0.03849 0.17128 0.35128 0.52255 0.16237 0.08300 0.24537 — 4,231.29 4,231.29 0.16145 0.04009 0.71641 4,247.99%Reduced ——————————————————
Daily,Winter(Max)
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
12 / 69
Unmit. 0.93359 0.82775 5.46898 25.1445 0.03676 0.16315 0.33893 0.50208 0.15489 0.08010 0.23499 — 4,073.76 4,073.76 0.15645 0.04903 0.01799 4,092.30 Mit. 0.93359 0.82775 5.46898 25.1445 0.03676 0.16315 0.33893 0.50208 0.15489 0.08010 0.23499 — 4,073.76 4,073.76 0.15645 0.04903 0.01799 4,092.30%Reduced ——————————————————
AverageDaily(Max)
——————————————————
Unmit. 0.57720 0.53025 2.65068 12.6454 0.01942 0.07356 0.10120 0.17476 0.07024 0.02417 0.09441 — 2,073.84 2,073.84 0.08107 0.02416 0.09682 2,083.17Mit. 0.57720 0.53025 2.65068 12.6454 0.01942 0.07356 0.10120 0.17476 0.07024 0.02417 0.09441 — 2,073.84 2,073.84 0.08107 0.02416 0.09682 2,083.17%Reduced ——————————————————
Annual(Max)
——————————————————
Unmit. 0.10534 0.09677 0.48375 2.30778 0.00354 0.01343 0.01847 0.03189 0.01282 0.00441 0.01723 — 343.348 343.348 0.01342 0.00400 0.01603 344.892Mit. 0.10534 0.09677 0.48375 2.30778 0.00354 0.01343 0.01847 0.03189 0.01282 0.00441 0.01723 — 343.348 343.348 0.01342 0.00400 0.01603 344.892%Reduced ——————————————————
2.2. Construction Emissions by Year2.2.1. Total Construction Emissions by Year, UnmitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.49200 0.44119 3.05244 15.1375 0.02381 0.08428 0.07751 0.16179 0.08073 0.01883 0.09956 — 2,502.32 2,502.32 0.09851 0.02709 0.21200 2,513.062032 3.41944 3.29417 6.23716 26.3733 0.03849 0.17128 0.35128 0.52255 0.16237 0.08300 0.24537 — 4,231.29 4,231.29 0.16145 0.04009 0.71641 4,247.99Daily -Winter(Max) ——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
13 / 69
2031 0.49192 0.44101 3.05702 15.1194 0.02381 0.08428 0.07751 0.16179 0.08073 0.01883 0.09956 — 2,499.85 2,499.85 0.09861 0.02901 0.00550 2,510.97 2032 0.93359 0.82775 5.46898 25.1445 0.03676 0.16315 0.33893 0.50208 0.15489 0.08010 0.23499 — 4,073.76 4,073.76 0.15645 0.04903 0.01799 4,092.30AverageDaily ——————————————————
2031 0.20598 0.18466 1.27993 6.33164 0.00997 0.03530 0.03200 0.06730 0.03381 0.00777 0.04158 — 1,047.06 1,047.06 0.04130 0.01215 0.03835 1,051.752032 0.57720 0.53025 2.65068 12.6454 0.01942 0.07356 0.10120 0.17476 0.07024 0.02417 0.09441 — 2,073.84 2,073.84 0.08107 0.02416 0.09682 2,083.17Annual — — — — — — — — — — — — — — — — — —2031 0.03759 0.03370 0.23359 1.15552 0.00182 0.00644 0.00584 0.01228 0.00617 0.00142 0.00759 — 173.353 173.353 0.00684 0.00201 0.00635 174.1302032 0.10534 0.09677 0.48375 2.30778 0.00354 0.01343 0.01847 0.03189 0.01282 0.00441 0.01723 — 343.348 343.348 0.01342 0.00400 0.01603 344.892
2.2.2. Onsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 0.00000 0.08387 0.08032 0.00000 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062032 3.33267 3.21970 6.12186 25.3326 0.03807 0.17087 0.00000 0.17087 0.16195 0.00000 0.16195 — 3,880.13 3,880.13 0.15740 0.03148 0.00000 3,893.45Daily -Winter(Max) ——————————————————
2031 0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 0.00000 0.08387 0.08032 0.00000 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062032 0.85003 0.75660 5.35181 24.2320 0.03635 0.16274 0.00000 0.16274 0.15447 0.00000 0.15447 — 3,746.63 3,746.63 0.15198 0.03040 0.00000 3,759.49AverageDaily ——————————————————
2031 0.19845 0.17836 1.25132 6.24826 0.00980 0.03512 0.00000 0.03512 0.03364 0.00000 0.03364 — 1,003.76 1,003.76 0.04072 0.00814 0.00000 1,007.212032 0.55275 0.50962 2.59559 12.3796 0.01912 0.07327 0.00000 0.07327 0.06995 0.00000 0.06995 — 1,960.44 1,960.44 0.07952 0.01590 0.00000 1,967.17Annual — — — — — — — — — — — — — — — — — —2031 0.03622 0.03255 0.22837 1.14031 0.00179 0.00641 0.00000 0.00641 0.00614 0.00000 0.00614 — 166.184 166.184 0.00674 0.00135 0.00000 166.7542032 0.10088 0.09301 0.47370 2.25927 0.00349 0.01337 0.00000 0.01337 0.01277 0.00000 0.01277 — 324.574 324.574 0.01317 0.00263 0.00000 325.688 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
14 / 69
2.2.3. Offsite Construction Emissions by Year, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.01813 0.01530 0.06447 0.21760 0.00041 0.00041 0.07751 0.07792 0.00041 0.01883 0.01924 — 105.485 105.485 0.00128 0.00764 0.21200 108.0062032 0.08677 0.07447 0.11530 1.04063 0.00041 0.00041 0.35128 0.35169 0.00041 0.08300 0.08341 — 351.154 351.154 0.00405 0.00861 0.71641 354.539Daily -Winter(Max) ——————————————————
2031 0.01805 0.01511 0.06906 0.19952 0.00041 0.00041 0.07751 0.07792 0.00041 0.01883 0.01924 — 103.023 103.023 0.00139 0.00957 0.00550 105.9152032 0.08356 0.07114 0.11717 0.91252 0.00041 0.00041 0.33893 0.33934 0.00041 0.08010 0.08052 — 327.131 327.131 0.00447 0.01863 0.01799 332.814AverageDaily ——————————————————
2031 0.00753 0.00630 0.02861 0.08338 0.00017 0.00017 0.03200 0.03218 0.00017 0.00777 0.00794 — 43.3012 43.3012 0.00058 0.00401 0.03835 44.54842032 0.02444 0.02063 0.05509 0.26581 0.00030 0.00030 0.10120 0.10149 0.00030 0.02417 0.02447 — 113.398 113.398 0.00155 0.00825 0.09682 115.994Annual — — — — — — — — — — — — — — — — — —2031 0.00137 0.00115 0.00522 0.01522 0.00003 0.00003 0.00584 0.00587 0.00003 0.00142 0.00145 — 7.16901 7.16901 0.00010 0.00066 0.00635 7.375492032 0.00446 0.00376 0.01005 0.04851 0.00005 0.00005 0.01847 0.01852 0.00005 0.00441 0.00446 — 18.7744 18.7744 0.00026 0.00137 0.01603 19.2041
2.2.4. Total Construction Emissions by Year, MitigatedIncludes both onsite and offsite emissions.Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.49200 0.44119 3.05244 15.1375 0.02381 0.08428 0.07751 0.16179 0.08073 0.01883 0.09956 — 2,502.32 2,502.32 0.09851 0.02709 0.21200 2,513.062032 3.41944 3.29417 6.23716 26.3733 0.03849 0.17128 0.35128 0.52255 0.16237 0.08300 0.24537 — 4,231.29 4,231.29 0.16145 0.04009 0.71641 4,247.99 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
15 / 69
— — — — — — — — — — — — — — — — — — Daily -
Winter(Max)
2031 0.49192 0.44101 3.05702 15.1194 0.02381 0.08428 0.07751 0.16179 0.08073 0.01883 0.09956 — 2,499.85 2,499.85 0.09861 0.02901 0.00550 2,510.972032 0.93359 0.82775 5.46898 25.1445 0.03676 0.16315 0.33893 0.50208 0.15489 0.08010 0.23499 — 4,073.76 4,073.76 0.15645 0.04903 0.01799 4,092.30AverageDaily ——————————————————
2031 0.20598 0.18466 1.27993 6.33164 0.00997 0.03530 0.03200 0.06730 0.03381 0.00777 0.04158 — 1,047.06 1,047.06 0.04130 0.01215 0.03835 1,051.752032 0.57720 0.53025 2.65068 12.6454 0.01942 0.07356 0.10120 0.17476 0.07024 0.02417 0.09441 — 2,073.84 2,073.84 0.08107 0.02416 0.09682 2,083.17Annual — — — — — — — — — — — — — — — — — —2031 0.03759 0.03370 0.23359 1.15552 0.00182 0.00644 0.00584 0.01228 0.00617 0.00142 0.00759 — 173.353 173.353 0.00684 0.00201 0.00635 174.1302032 0.10534 0.09677 0.48375 2.30778 0.00354 0.01343 0.01847 0.03189 0.01282 0.00441 0.01723 — 343.348 343.348 0.01342 0.00400 0.01603 344.892
2.2.5. Onsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 0.00000 0.08387 0.08032 0.00000 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062032 3.33267 3.21970 6.12186 25.3326 0.03807 0.17087 0.00000 0.17087 0.16195 0.00000 0.16195 — 3,880.13 3,880.13 0.15740 0.03148 0.00000 3,893.45Daily -Winter(Max) ——————————————————
2031 0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 0.00000 0.08387 0.08032 0.00000 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 0.00000 2,405.062032 0.85003 0.75660 5.35181 24.2320 0.03635 0.16274 0.00000 0.16274 0.15447 0.00000 0.15447 — 3,746.63 3,746.63 0.15198 0.03040 0.00000 3,759.49AverageDaily ——————————————————
2031 0.19845 0.17836 1.25132 6.24826 0.00980 0.03512 0.00000 0.03512 0.03364 0.00000 0.03364 — 1,003.76 1,003.76 0.04072 0.00814 0.00000 1,007.212032 0.55275 0.50962 2.59559 12.3796 0.01912 0.07327 0.00000 0.07327 0.06995 0.00000 0.06995 — 1,960.44 1,960.44 0.07952 0.01590 0.00000 1,967.17Annual — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
16 / 69
2031 0.03622 0.03255 0.22837 1.14031 0.00179 0.00641 0.00000 0.00641 0.00614 0.00000 0.00614 — 166.184 166.184 0.00674 0.00135 0.00000 166.754 2032 0.10088 0.09301 0.47370 2.25927 0.00349 0.01337 0.00000 0.01337 0.01277 0.00000 0.01277 — 324.574 324.574 0.01317 0.00263 0.00000 325.688
2.2.6. Offsite Construction Emissions by Year, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily -Summer(Max) ——————————————————
2031 0.01813 0.01530 0.06447 0.21760 0.00041 0.00041 0.07751 0.07792 0.00041 0.01883 0.01924 — 105.485 105.485 0.00128 0.00764 0.21200 108.0062032 0.08677 0.07447 0.11530 1.04063 0.00041 0.00041 0.35128 0.35169 0.00041 0.08300 0.08341 — 351.154 351.154 0.00405 0.00861 0.71641 354.539Daily -Winter(Max) ——————————————————
2031 0.01805 0.01511 0.06906 0.19952 0.00041 0.00041 0.07751 0.07792 0.00041 0.01883 0.01924 — 103.023 103.023 0.00139 0.00957 0.00550 105.9152032 0.08356 0.07114 0.11717 0.91252 0.00041 0.00041 0.33893 0.33934 0.00041 0.08010 0.08052 — 327.131 327.131 0.00447 0.01863 0.01799 332.814AverageDaily ——————————————————
2031 0.00753 0.00630 0.02861 0.08338 0.00017 0.00017 0.03200 0.03218 0.00017 0.00777 0.00794 — 43.3012 43.3012 0.00058 0.00401 0.03835 44.54842032 0.02444 0.02063 0.05509 0.26581 0.00030 0.00030 0.10120 0.10149 0.00030 0.02417 0.02447 — 113.398 113.398 0.00155 0.00825 0.09682 115.994Annual — — — — — — — — — — — — — — — — — —2031 0.00137 0.00115 0.00522 0.01522 0.00003 0.00003 0.00584 0.00587 0.00003 0.00142 0.00145 — 7.16901 7.16901 0.00010 0.00066 0.00635 7.375492032 0.00446 0.00376 0.01005 0.04851 0.00005 0.00005 0.01847 0.01852 0.00005 0.00441 0.00446 — 18.7744 18.7744 0.00026 0.00137 0.01603 19.2041
2.3. Operations Emissions Compared Against ThresholdsCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
17 / 69
Unmit. 1.38326 1.29134 0.82444 7.90717 0.02118 0.02227 2.14188 2.16415 0.02132 0.54312 0.56444 9.44989 2,329.63 2,339.08 1.07047 0.10555 4.21872 2,401.52 Mit. 1.16766 1.09136 0.74151 6.58481 0.01882 0.02008 1.89773 1.91780 0.01943 0.48121 0.50064 9.44989 2,091.25 2,100.70 1.06177 0.09629 3.74581 2,159.69%Reduced 16% 15% 10% 17% 11% 10% 11% 11% 9% 11% 11% — 10% 10% 1% 9% 11% 10% Daily,Winter(Max)
——————————————————
Unmit. 1.29077 1.20359 0.90133 7.23901 0.02044 0.02141 2.14188 2.16329 0.02067 0.54312 0.56379 9.44989 2,256.04 2,265.49 1.07588 0.11099 0.17762 2,325.64Mit. 1.16289 1.08483 0.81327 6.42618 0.01820 0.02008 1.89773 1.91781 0.01943 0.48121 0.50064 9.44989 2,027.61 2,037.06 1.06661 0.10112 0.16535 2,094.02%Reduced 10% 10% 10% 11% 11% 6% 11% 11% 6% 11% 11% — 10% 10% 1% 9% 7% 10% AverageDaily(Max)
——————————————————
Unmit. 1.32463 1.23497 0.88730 7.38721 0.02056 0.02183 2.11076 2.13260 0.02099 0.53534 0.55633 9.44989 2,268.22 2,277.67 1.07377 0.10966 1.86141 2,339.06Mit. 1.15483 1.07751 0.79904 6.34376 0.01830 0.02008 1.87016 1.89024 0.01943 0.47432 0.49375 9.44989 2,037.63 2,047.08 1.06473 0.09993 1.65721 2,105.14%Reduced 13% 13% 10% 14% 11% 8% 11% 11% 7% 11% 11% — 10% 10% 1% 9% 11% 10% Annual(Max)
——————————————————
Unmit. 0.24174 0.22538 0.16193 1.34817 0.00375 0.00398 0.38521 0.38920 0.00383 0.09770 0.10153 1.56454 375.530 377.095 0.17778 0.01815 0.30818 387.257Mit. 0.21076 0.19665 0.14583 1.15774 0.00334 0.00366 0.34130 0.34497 0.00355 0.08656 0.09011 1.56454 337.353 338.918 0.17628 0.01655 0.27437 348.529%Reduced 13% 13% 10% 14% 11% 8% 11% 11% 7% 11% 11% — 10% 10% 1% 9% 11% 10%
2.4. Operations Emissions by Sector, UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Mobile 1.02704 0.94892 0.69150 7.30984 0.02037 0.01161 2.14188 2.15349 0.01088 0.54312 0.55399 — 2,075.57 2,075.57 0.07579 0.08112 4.14868 2,105.79 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
18 / 69
Area 0.34205 0.33534 0.00412 0.48912 0.00003 0.00087 — 0.00087 0.00066 — 0.00066 — 2.01131 2.01131 0.00008 0.00002 — 2.01856 Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.435 228.435 0.02306 0.00144 — 229.439Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.38326 1.29134 0.82444 7.90717 0.02118 0.02227 2.14188 2.16415 0.02132 0.54312 0.56444 9.44989 2,329.63 2,339.08 1.07047 0.10555 4.21872 2,401.52Daily,Winter(Max) ——————————————————
Mobile 1.02165 0.94155 0.77249 7.13080 0.01967 0.01161 2.14188 2.15349 0.01088 0.54312 0.55400 — 2,004.00 2,004.00 0.08129 0.08658 0.10757 2,031.94Area 0.25495 0.25495 ————————————————Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.435 228.435 0.02306 0.00144 — 229.439Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.29077 1.20359 0.90133 7.23901 0.02044 0.02141 2.14188 2.16329 0.02067 0.54312 0.56379 9.44989 2,256.04 2,265.49 1.07588 0.11099 0.17762 2,325.64AverageDaily ——————————————————
Mobile 1.01255 0.93329 0.75644 7.03778 0.01978 0.01161 2.11076 2.12238 0.01088 0.53534 0.54622 — 2,015.18 2,015.18 0.07914 0.08523 1.79137 2,044.35Area 0.29790 0.29459 0.00203 0.24121 0.00001 0.00043 — 0.00043 0.00032 — 0.00032 — 0.99188 0.99188 0.00004 0.00001 — 0.99545Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.435 228.435 0.02306 0.00144 — 229.439Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.32463 1.23497 0.88730 7.38721 0.02056 0.02183 2.11076 2.13260 0.02099 0.53534 0.55633 9.44989 2,268.22 2,277.67 1.07377 0.10966 1.86141 2,339.06Annual — — — — — — — — — — — — — — — — — —Mobile 0.18479 0.17033 0.13805 1.28439 0.00361 0.00212 0.38521 0.38733 0.00199 0.09770 0.09968 — 333.637 333.637 0.01310 0.01411 0.29658 338.466Area 0.05437 0.05376 0.00037 0.04402 <
0.000005
0.00008 — 0.00008 0.00006 — 0.00006 — 0.16422 0.16422 0.00001 <
0.000005
— 0.16481
Energy 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 37.8200 37.8200 0.00382 0.00024 — 37.9863 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
19 / 69
Water — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319 Waste — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662Refrig. — — — — — — — — — — — — — — — — 0.01160 0.01160Total 0.24174 0.22538 0.16193 1.34817 0.00375 0.00398 0.38521 0.38920 0.00383 0.09770 0.10153 1.56454 375.530 377.095 0.17778 0.01815 0.30818 387.257
2.5. Operations Emissions by Sector, MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Mobile 0.90997 0.84075 0.61267 6.47659 0.01805 0.01029 1.89773 1.90801 0.00964 0.48121 0.49085 — 1,838.98 1,838.98 0.06715 0.07188 3.67577 1,865.75Area 0.24352 0.24352 ————————————————Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.660 228.660 0.02309 0.00144 — 229.666Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.16766 1.09136 0.74151 6.58481 0.01882 0.02008 1.89773 1.91780 0.01943 0.48121 0.50064 9.44989 2,091.25 2,100.70 1.06177 0.09629 3.74581 2,159.69Daily,Winter(Max) ——————————————————
Mobile 0.90519 0.83423 0.68444 6.31796 0.01742 0.01029 1.89773 1.90802 0.00964 0.48121 0.49085 — 1,775.56 1,775.56 0.07202 0.07671 0.09531 1,800.32Area 0.24352 0.24352 ————————————————Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.435 228.435 0.02306 0.00144 — 229.439Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.16289 1.08483 0.81327 6.42618 0.01820 0.02008 1.89773 1.91781 0.01943 0.48121 0.50064 9.44989 2,027.61 2,037.06 1.06661 0.10112 0.16535 2,094.02AverageDaily ——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
20 / 69
Mobile 0.89713 0.82690 0.67021 6.23554 0.01752 0.01029 1.87016 1.88045 0.00964 0.47432 0.48395 — 1,785.47 1,785.47 0.07012 0.07552 1.58717 1,811.32 Area 0.24352 0.24352 ————————————————Energy 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 228.546 228.546 0.02307 0.00144 — 229.551Water — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Waste — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Refrig. — — — — — — — — — — — — — — — — 0.07004 0.07004Total 1.15483 1.07751 0.79904 6.34376 0.01830 0.02008 1.87016 1.89024 0.01943 0.47432 0.49375 9.44989 2,037.63 2,047.08 1.06473 0.09993 1.65721 2,105.14Annual — — — — — — — — — — — — — — — — — —Mobile 0.16373 0.15091 0.12231 1.13799 0.00320 0.00188 0.34130 0.34318 0.00176 0.08656 0.08832 — 295.605 295.605 0.01161 0.01250 0.26277 299.884Area 0.04444 0.04444 ————————————————Energy 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 37.8384 37.8384 0.00382 0.00024 — 38.0048Water — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319Waste — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662Refrig. — — — — — — — — — — — — — — — — 0.01160 0.01160Total 0.21076 0.19665 0.14583 1.15774 0.00334 0.00366 0.34130 0.34497 0.00355 0.08656 0.09011 1.56454 337.353 338.918 0.17628 0.01655 0.27437 348.529
3. Construction Emissions Details3.1. Building Construction (2031)3.1.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
21 / 69
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.19845 0.17836 1.25132 6.24826 0.00980 0.03512 — 0.03512 0.03364 — 0.03364 — 1,003.76 1,003.76 0.04072 0.00814 — 1,007.21 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.03622 0.03255 0.22837 1.14031 0.00179 0.00641 — 0.00641 0.00614 — 0.00614 — 166.184 166.184 0.00674 0.00135 — 166.754 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.01624 0.01411 0.01213 0.19967 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 56.7777 56.7777 0.00062 0.00031 0.13554 57.0220Vendor 0.00189 0.00119 0.05234 0.01793 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 48.7070 48.7070 0.00066 0.00733 0.07646 50.9845 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
22 / 69
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Worker 0.01624 0.01401 0.01458 0.18098 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 54.2825 54.2825 0.00073 0.00224 0.00353 54.9714Vendor 0.00180 0.00111 0.05448 0.01854 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 48.7402 48.7402 0.00066 0.00733 0.00197 50.9432Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.00676 0.00582 0.00602 0.07575 0.00000 0.00000 0.02548 0.02548 0.00000 0.00597 0.00597 — 22.8975 22.8975 0.00031 0.00094 0.02457 23.2091Vendor 0.00077 0.00048 0.02259 0.00763 0.00017 0.00017 0.00652 0.00670 0.00017 0.00180 0.00198 — 20.4037 20.4037 0.00028 0.00307 0.01378 21.3392Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00123 0.00106 0.00110 0.01382 0.00000 0.00000 0.00465 0.00465 0.00000 0.00109 0.00109 — 3.79095 3.79095 0.00005 0.00016 0.00407 3.84254Vendor 0.00014 0.00009 0.00412 0.00139 0.00003 0.00003 0.00119 0.00122 0.00003 0.00033 0.00036 — 3.37807 3.37807 0.00005 0.00051 0.00228 3.53295Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
23 / 69
Off-RoaEquipment
0.47387 0.42590 2.98797 14.9199 0.02340 0.08387 — 0.08387 0.08032 — 0.08032 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Off-RoadEquipment
0.19845 0.17836 1.25132 6.24826 0.00980 0.03512 — 0.03512 0.03364 — 0.03364 — 1,003.76 1,003.76 0.04072 0.00814 — 1,007.21 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.03622 0.03255 0.22837 1.14031 0.00179 0.00641 — 0.00641 0.00614 — 0.00614 — 166.184 166.184 0.00674 0.00135 — 166.754 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.01624 0.01411 0.01213 0.19967 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 56.7777 56.7777 0.00062 0.00031 0.13554 57.0220Vendor 0.00189 0.00119 0.05234 0.01793 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 48.7070 48.7070 0.00066 0.00733 0.07646 50.9845Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01624 0.01401 0.01458 0.18098 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 54.2825 54.2825 0.00073 0.00224 0.00353 54.9714Vendor 0.00180 0.00111 0.05448 0.01854 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 48.7402 48.7402 0.00066 0.00733 0.00197 50.9432 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
24 / 69
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
Worker 0.00676 0.00582 0.00602 0.07575 0.00000 0.00000 0.02548 0.02548 0.00000 0.00597 0.00597 — 22.8975 22.8975 0.00031 0.00094 0.02457 23.2091Vendor 0.00077 0.00048 0.02259 0.00763 0.00017 0.00017 0.00652 0.00670 0.00017 0.00180 0.00198 — 20.4037 20.4037 0.00028 0.00307 0.01378 21.3392Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00123 0.00106 0.00110 0.01382 0.00000 0.00000 0.00465 0.00465 0.00000 0.00109 0.00109 — 3.79095 3.79095 0.00005 0.00016 0.00407 3.84254Vendor 0.00014 0.00009 0.00412 0.00139 0.00003 0.00003 0.00119 0.00122 0.00003 0.00033 0.00036 — 3.37807 3.37807 0.00005 0.00051 0.00228 3.53295Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Building Construction (2032)3.2.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.46949 0.42228 2.97670 14.9159 0.02340 0.08168 — 0.08168 0.07830 — 0.07830 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.46949 0.42228 2.97670 14.9159 0.02340 0.08168 — 0.08168 0.07830 — 0.07830 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
25 / 69
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Onsite truck
AverageDaily
——————————————————
Off-RoadEquipment
0.33535 0.30163 2.12621 10.6542 0.01671 0.05834 — 0.05834 0.05593 — 0.05593 — 1,712.02 1,712.02 0.06945 0.01389 — 1,717.90 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.06120 0.05505 0.38803 1.94439 0.00305 0.01065 — 0.01065 0.01021 — 0.01021 — 283.445 283.445 0.01150 0.00230 — 284.418 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.01562 0.01349 0.01203 0.18827 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 55.9593 55.9593 0.00062 0.00031 0.11983 56.1878Vendor 0.00189 0.00119 0.04994 0.01751 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 47.0542 47.0542 0.00066 0.00692 0.06520 49.1969Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01562 0.01338 0.01244 0.17088 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 53.5012 53.5012 0.00073 0.00224 0.00311 54.1897Vendor 0.00180 0.00111 0.05204 0.01808 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 47.0891 47.0891 0.00066 0.00692 0.00170 49.1683Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
26 / 69
AverageDaily
——————————————————
Worker 0.01116 0.00956 0.00881 0.12213 0.00000 0.00000 0.04346 0.04346 0.00000 0.01018 0.01018 — 38.4925 38.4925 0.00052 0.00160 0.03699 39.0190Vendor 0.00132 0.00082 0.03682 0.01268 0.00030 0.00030 0.01113 0.01142 0.00030 0.00308 0.00337 — 33.6206 33.6206 0.00047 0.00494 0.02015 35.1247Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00204 0.00174 0.00161 0.02229 0.00000 0.00000 0.00793 0.00793 0.00000 0.00186 0.00186 — 6.37287 6.37287 0.00009 0.00026 0.00612 6.46004Vendor 0.00024 0.00015 0.00672 0.00231 0.00005 0.00005 0.00203 0.00208 0.00005 0.00056 0.00062 — 5.56628 5.56628 0.00008 0.00082 0.00334 5.81530Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.46949 0.42228 2.97670 14.9159 0.02340 0.08168 — 0.08168 0.07830 — 0.07830 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.46949 0.42228 2.97670 14.9159 0.02340 0.08168 — 0.08168 0.07830 — 0.07830 — 2,396.83 2,396.83 0.09723 0.01945 — 2,405.06 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
27 / 69
Off-RoaEquipment
0.33535 0.30163 2.12621 10.6542 0.01671 0.05834 — 0.05834 0.05593 — 0.05593 — 1,712.02 1,712.02 0.06945 0.01389 — 1,717.90 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.06120 0.05505 0.38803 1.94439 0.00305 0.01065 — 0.01065 0.01021 — 0.01021 — 283.445 283.445 0.01150 0.00230 — 284.418 Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.01562 0.01349 0.01203 0.18827 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 55.9593 55.9593 0.00062 0.00031 0.11983 56.1878Vendor 0.00189 0.00119 0.04994 0.01751 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 47.0542 47.0542 0.00066 0.00692 0.06520 49.1969Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.01562 0.01338 0.01244 0.17088 0.00000 0.00000 0.06174 0.06174 0.00000 0.01447 0.01447 — 53.5012 53.5012 0.00073 0.00224 0.00311 54.1897Vendor 0.00180 0.00111 0.05204 0.01808 0.00041 0.00041 0.01577 0.01618 0.00041 0.00436 0.00477 — 47.0891 47.0891 0.00066 0.00692 0.00170 49.1683Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01116 0.00956 0.00881 0.12213 0.00000 0.00000 0.04346 0.04346 0.00000 0.01018 0.01018 — 38.4925 38.4925 0.00052 0.00160 0.03699 39.0190Vendor 0.00132 0.00082 0.03682 0.01268 0.00030 0.00030 0.01113 0.01142 0.00030 0.00308 0.00337 — 33.6206 33.6206 0.00047 0.00494 0.02015 35.1247Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
28 / 69
Annual — — — — — — — — — — — — — — — — — —
Worker 0.00204 0.00174 0.00161 0.02229 0.00000 0.00000 0.00793 0.00793 0.00000 0.00186 0.00186 — 6.37287 6.37287 0.00009 0.00026 0.00612 6.46004Vendor 0.00024 0.00015 0.00672 0.00231 0.00005 0.00005 0.00203 0.00208 0.00005 0.00056 0.00062 — 5.56628 5.56628 0.00008 0.00082 0.00334 5.81530Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3. Paving (2032)3.3.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.38054 0.33433 2.37511 9.31606 0.01295 0.08106 — 0.08106 0.07617 — 0.07617 — 1,349.80 1,349.80 0.05475 0.01095 — 1,354.43 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.38054 0.33433 2.37511 9.31606 0.01295 0.08106 — 0.08106 0.07617 — 0.07617 — 1,349.80 1,349.80 0.05475 0.01095 — 1,354.43 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
29 / 69
241.200 — 0.00195 0.00975 240.375 240.375 — 0.01356 — 0.01356 0.01444 — 0.01444 0.00231 1.65902 0.42296 0.05954 0.06777 Off-Roa dEquipm
Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01237 0.01087 0.07719 0.30277 0.00042 0.00263 — 0.00263 0.00248 — 0.00248 — 39.7968 39.7968 0.00161 0.00032 — 39.9334 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.06614 0.05710 0.05093 0.79719 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 236.949 236.949 0.00265 0.00132 0.50741 237.917Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.06614 0.05666 0.05269 0.72356 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 226.541 226.541 0.00309 0.00948 0.01318 229.456Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01178 0.01009 0.00930 0.12893 0.00000 0.00000 0.04588 0.04588 0.00000 0.01074 0.01074 — 40.6356 40.6356 0.00055 0.00169 0.03905 41.1915 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
30 / 69
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00215 0.00184 0.00170 0.02353 0.00000 0.00000 0.00837 0.00837 0.00000 0.00196 0.00196 — 6.72769 6.72769 0.00009 0.00028 0.00647 6.81972Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.38054 0.33433 2.37511 9.31606 0.01295 0.08106 — 0.08106 0.07617 — 0.07617 — 1,349.80 1,349.80 0.05475 0.01095 — 1,354.43 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
Off-RoadEquipment
0.38054 0.33433 2.37511 9.31606 0.01295 0.08106 — 0.08106 0.07617 — 0.07617 — 1,349.80 1,349.80 0.05475 0.01095 — 1,354.43 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 AverageDaily
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
31 / 69
241.200 — 0.00195 0.00975 240.375 240.375 — 0.01356 — 0.01356 0.01444 — 0.01444 0.00231 1.65902 0.42296 0.05954 0.06777 Off-Roa d
Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.01237 0.01087 0.07719 0.30277 0.00042 0.00263 — 0.00263 0.00248 — 0.00248 — 39.7968 39.7968 0.00161 0.00032 — 39.9334 Paving 0.00000 0.00000 ————————————————Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.06614 0.05710 0.05093 0.79719 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 236.949 236.949 0.00265 0.00132 0.50741 237.917Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
Worker 0.06614 0.05666 0.05269 0.72356 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 226.541 226.541 0.00309 0.00948 0.01318 229.456Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000AverageDaily ——————————————————
Worker 0.01178 0.01009 0.00930 0.12893 0.00000 0.00000 0.04588 0.04588 0.00000 0.01074 0.01074 — 40.6356 40.6356 0.00055 0.00169 0.03905 41.1915 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
32 / 69
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — —Worker 0.00215 0.00184 0.00170 0.02353 0.00000 0.00000 0.00837 0.00837 0.00000 0.00196 0.00196 — 6.72769 6.72769 0.00009 0.00028 0.00647 6.81972Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4. Architectural Coating (2032)3.4.1. Onsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.11264 0.09309 0.77005 1.10069 0.00173 0.00813 — 0.00813 0.00748 — 0.00748 — 133.504 133.504 0.00542 0.00108 — 133.962 ArchitecturalCoatings
2.37001 2.37001 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
AverageDaily
——————————————————
Off-RoadEquipment
0.00679 0.00561 0.04641 0.06634 0.00010 0.00049 — 0.00049 0.00045 — 0.00045 — 8.04680 8.04680 0.00033 0.00007 — 8.07441 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
33 / 69
ArchitectCoatings
0.14285 0.14285 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00124 0.00102 0.00847 0.01211 0.00002 0.00009 — 0.00009 0.00008 — 0.00008 — 1.33224 1.33224 0.00005 0.00001 — 1.33681 ArchitecturalCoatings
0.02607 0.02607 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.2. Offsite - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.00312 0.00270 0.00241 0.03765 0.00000 0.00000 0.01235 0.01235 0.00000 0.00289 0.00289 — 11.1919 11.1919 0.00012 0.00006 0.02397 11.2376Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
AverageDaily
——————————————————
Worker 0.00019 0.00016 0.00015 0.00206 0.00000 0.00000 0.00073 0.00073 0.00000 0.00017 0.00017 — 0.64963 0.64963 0.00001 0.00003 0.00062 0.65851Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
34 / 69
Annual — — — — — — — — — — — — — — — — — —
Worker 0.00003 0.00003 0.00003 0.00038 0.00000 0.00000 0.00013 0.00013 0.00000 0.00003 0.00003 — 0.10755 0.10755 <
0.000005
<0.000005
0.00010 0.10902
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.3. Onsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Off-RoadEquipment
0.11264 0.09309 0.77005 1.10069 0.00173 0.00813 — 0.00813 0.00748 — 0.00748 — 133.504 133.504 0.00542 0.00108 — 133.962 ArchitecturalCoatings
2.37001 2.37001 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,Winter(Max)
——————————————————
AverageDaily
——————————————————
Off-RoadEquipment
0.00679 0.00561 0.04641 0.06634 0.00010 0.00049 — 0.00049 0.00045 — 0.00045 — 8.04680 8.04680 0.00033 0.00007 — 8.07441 ArchitecturalCoatings
0.14285 0.14285 ————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
35 / 69
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —Off-RoadEquipment
0.00124 0.00102 0.00847 0.01211 0.00002 0.00009 — 0.00009 0.00008 — 0.00008 — 1.33224 1.33224 0.00005 0.00001 — 1.33681 ArchitecturalCoatings
0.02607 0.02607 ————————————————
Onsitetruck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.4.4. Offsite - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Worker 0.00312 0.00270 0.00241 0.03765 0.00000 0.00000 0.01235 0.01235 0.00000 0.00289 0.00289 — 11.1919 11.1919 0.00012 0.00006 0.02397 11.2376Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Daily,Winter(Max) ——————————————————
AverageDaily
——————————————————
Worker 0.00019 0.00016 0.00015 0.00206 0.00000 0.00000 0.00073 0.00073 0.00000 0.00017 0.00017 — 0.64963 0.64963 0.00001 0.00003 0.00062 0.65851Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Annual — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
36 / 69
0.10902 0.00010 0.10755 0.10755 — 0.00003 0.00003 0.00000 0.00013 0.00013 0.00000 0.00000 0.00038 0.00003 0.00003 0.00003 Worker <
0.000005
<0.000005
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details4.1. Mobile Emissions by Land Use4.1.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena 1.02704 0.94892 0.69150 7.30984 0.02037 0.01161 2.14188 2.15349 0.01088 0.54312 0.55399 — 2,075.57 2,075.57 0.07579 0.08112 4.14868 2,105.79Total 1.02704 0.94892 0.69150 7.30984 0.02037 0.01161 2.14188 2.15349 0.01088 0.54312 0.55399 — 2,075.57 2,075.57 0.07579 0.08112 4.14868 2,105.79Daily,Winter(Max) ——————————————————
Arena 1.02165 0.94155 0.77249 7.13080 0.01967 0.01161 2.14188 2.15349 0.01088 0.54312 0.55400 — 2,004.00 2,004.00 0.08129 0.08658 0.10757 2,031.94Total 1.02165 0.94155 0.77249 7.13080 0.01967 0.01161 2.14188 2.15349 0.01088 0.54312 0.55400 — 2,004.00 2,004.00 0.08129 0.08658 0.10757 2,031.94Annual — — — — — — — — — — — — — — — — — —Arena 0.18479 0.17033 0.13805 1.28439 0.00361 0.00212 0.38521 0.38733 0.00199 0.09770 0.09968 — 333.637 333.637 0.01310 0.01411 0.29658 338.466Total 0.18479 0.17033 0.13805 1.28439 0.00361 0.00212 0.38521 0.38733 0.00199 0.09770 0.09968 — 333.637 333.637 0.01310 0.01411 0.29658 338.466
4.1.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
37 / 69
Daily,Summer(Max)
——————————————————
Arena 0.90997 0.84075 0.61267 6.47659 0.01805 0.01029 1.89773 1.90801 0.00964 0.48121 0.49085 — 1,838.98 1,838.98 0.06715 0.07188 3.67577 1,865.75Total 0.90997 0.84075 0.61267 6.47659 0.01805 0.01029 1.89773 1.90801 0.00964 0.48121 0.49085 — 1,838.98 1,838.98 0.06715 0.07188 3.67577 1,865.75Daily,Winter(Max) ——————————————————
Arena 0.90519 0.83423 0.68444 6.31796 0.01742 0.01029 1.89773 1.90802 0.00964 0.48121 0.49085 — 1,775.56 1,775.56 0.07202 0.07671 0.09531 1,800.32Total 0.90519 0.83423 0.68444 6.31796 0.01742 0.01029 1.89773 1.90802 0.00964 0.48121 0.49085 — 1,775.56 1,775.56 0.07202 0.07671 0.09531 1,800.32Annual — — — — — — — — — — — — — — — — — —Arena 0.16373 0.15091 0.12231 1.13799 0.00320 0.00188 0.34130 0.34318 0.00176 0.08656 0.08832 — 295.605 295.605 0.01161 0.01250 0.26277 299.884Total 0.16373 0.15091 0.12231 1.13799 0.00320 0.00188 0.34130 0.34318 0.00176 0.08656 0.08832 — 295.605 295.605 0.01161 0.01250 0.26277 299.884
4.2. Energy4.2.1. Electricity Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Total — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Total — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — — 12.3704 12.3704 0.00157 0.00019 — 12.4661 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
38 / 69
Total — — — — — — — — — — — — 12.3704 12.3704 0.00157 0.00019 — 12.4661
4.2.2. Electricity Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — — 74.9433 74.9433 0.00948 0.00115 — 75.5230Total — — — — — — — — — — — — 74.9433 74.9433 0.00948 0.00115 — 75.5230Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Total — — — — — — — — — — — — 74.7180 74.7180 0.00945 0.00115 — 75.2959Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — — 12.3888 12.3888 0.00157 0.00019 — 12.4846Total — — — — — — — — — — — — 12.3888 12.3888 0.00157 0.00019 — 12.4846
4.2.3. Natural Gas Emissions By Land Use - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Total 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Daily,Winter(Max) ——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
39 / 69
Arena 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143 Total 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Annual — — — — — — — — — — — — — — — — — —Arena 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 25.4496 25.4496 0.00225 0.00005 — 25.5202Total 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 25.4496 25.4496 0.00225 0.00005 — 25.5202
4.2.4. Natural Gas Emissions By Land Use - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Total 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Daily,Winter(Max) ——————————————————
Arena 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Total 0.01417 0.00709 0.12883 0.10822 0.00077 0.00979 — 0.00979 0.00979 — 0.00979 — 153.717 153.717 0.01360 0.00029 — 154.143Annual — — — — — — — — — — — — — — — — — —Arena 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 25.4496 25.4496 0.00225 0.00005 — 25.5202Total 0.00259 0.00129 0.02351 0.01975 0.00014 0.00179 — 0.00179 0.00179 — 0.00179 — 25.4496 25.4496 0.00225 0.00005 — 25.5202
4.3. Area Emissions by Source4.3.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
40 / 69
— — — — — — — — — — — — — — — — — — Daily,
Summer(Max)
ConsumerProducts
0.24066 0.24066 ————————————————
ArchitecturalCoatings
0.01428 0.01428 ————————————————
LandscapeEquipment
0.08710 0.08039 0.00412 0.48912 0.00003 0.00087 — 0.00087 0.00066 — 0.00066 — 2.01131 2.01131 0.00008 0.00002 — 2.01856 Total 0.34205 0.33534 0.00412 0.48912 0.00003 0.00087 — 0.00087 0.00066 — 0.00066 — 2.01131 2.01131 0.00008 0.00002 — 2.01856Daily,Winter(Max) ——————————————————
ConsumerProducts
0.24066 0.24066 ————————————————
ArchitecturalCoatings
0.01428 0.01428 ————————————————
Total 0.25495 0.25495 ————————————————Annual — — — — — — — — — — — — — — — — — —ConsumerProducts
0.04392 0.04392 ————————————————
ArchitecturalCoatings
0.00261 0.00261 ————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
41 / 69
0.16481 — 0.00001 0.16422 0.16422 — 0.00006 — 0.00006 0.00008 — 0.00008 0.04402 0.00037 0.00723 0.00784 Landsca pe
<0.000005
<0.000005
Total 0.05437 0.05376 0.00037 0.04402 <
0.000005
0.00008 — 0.00008 0.00006 — 0.00006 — 0.16422 0.16422 0.00001 <
0.000005
— 0.16481
4.3.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
ConsumerProducts
0.24066 0.24066 ————————————————
ArchitecturalCoatings
0.00286 0.00286 ————————————————
Total 0.24352 0.24352 ————————————————Daily,Winter(Max) ——————————————————
ConsumerProducts
0.24066 0.24066 ————————————————
ArchitecturalCoatings
0.00286 0.00286 ————————————————
Total 0.24352 0.24352 ————————————————Annual — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
42 / 69
— — — — — — — — — — — — — — — — 0.04392 0.04392 Consum
erProducts
ArchitecturalCoatings
0.00052 0.00052 ————————————————
Total 0.04444 0.04444 ————————————————
4.4. Water Emissions by Land Use4.4.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Total — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Total — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319Total — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319
4.4.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
43 / 69
LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Total — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Total — — — — — — — — — — — 9.28309 23.6112 32.8943 0.95486 0.02298 — 63.6134Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319Total — — — — — — — — — — — 1.53692 3.90910 5.44602 0.15809 0.00380 — 10.5319
4.5. Waste Emissions by Land Use4.5.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Total — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Total — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
44 / 69
Annual — — — — — — — — — — — — — — — — — —
Arena — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662Total — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662
4.5.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Total — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Total — — — — — — — — — — — 0.16680 0.00000 0.16680 0.01667 0.00000 — 0.58356Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662Total — — — — — — — — — — — 0.02762 0.00000 0.02762 0.00276 0.00000 — 0.09662
4.6. Refrigerant Emissions by Land Use4.6.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
45 / 69
Arena — — — — — — — — — — — — — — — — 0.07004 0.07004
Total — — — — — — — — — — — — — — — — 0.07004 0.07004Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — — — — — — 0.07004 0.07004Total — — — — — — — — — — — — — — — — 0.07004 0.07004Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — — — — — — 0.01160 0.01160Total — — — — — — — — — — — — — — — — 0.01160 0.01160
4.6.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Arena — — — — — — — — — — — — — — — — 0.07004 0.07004Total — — — — — — — — — — — — — — — — 0.07004 0.07004Daily,Winter(Max) ——————————————————
Arena — — — — — — — — — — — — — — — — 0.07004 0.07004Total — — — — — — — — — — — — — — — — 0.07004 0.07004Annual — — — — — — — — — — — — — — — — — —Arena — — — — — — — — — — — — — — — — 0.01160 0.01160Total — — — — — — — — — — — — — — — — 0.01160 0.01160
4.7. Offroad Emissions By Equipment Type
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
46 / 69
4.7.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.7.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
47 / 69
4.8. Stationary Emissions By Equipment Type4.8.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.8.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
48 / 69
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type4.9.1. UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.9.2. MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) EquipmentType
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
49 / 69
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type4.10.1. Soil Carbon Accumulation By Vegetation Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
50 / 69
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - UnmitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
51 / 69
Avoided ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
4.10.4. Soil Carbon Accumulation By Vegetation Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Daily,Winter(Max) ——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LandUse
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,Summer(Max)
——————————————————
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
52 / 69
Total — — — — — — — — — — — — — — — — — —
Daily,Winter(Max)
——————————————————
Total — — — — — — — — — — — — — — — — — —Annual — — — — — — — — — — — — — — — — — —Total — — — — — — — — — — — — — — — — — —
4.10.6. Avoided and Sequestered Emissions by Species - MitigatedCriteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2eDaily,Summer(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Daily,Winter(Max) ——————————————————
Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
53 / 69
Remove — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — ————————————————————Annual — — — — — — — — — — — — — — — — — —Avoided ——————————————————Subtotal — — — — — — — — — — — — — — — — — —Sequestered ——————————————————
Subtotal — — — — — — — — — — — — — — — — — —Removed
——————————————————
Subtotal — — — — — — — — — — — — — — — — — ————————————————————
5. Activity Data5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase DescriptionBuilding Construction Building Construction 6/1/2031 12/30/2032 5.00000 414.000 —Paving Paving 8/01/2032 10/31/2032 5.00000 65.0000 —Architectural Coating Architectural Coating 9/01/2032 9/30/2032 5.00000 22.0000 —
5.2. Off-Road Equipment5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorBuilding Construction Cranes Diesel Tier 4 Final 1.000000 7.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 3.00000 8.00000 82.0000 0.20000 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
54 / 69
Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Tractors/Loaders/Back
hoes
Diesel Tier 4 Final 3.00000 7.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 2.00000 6.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 8.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 2.00000 6.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 6.00000 36.0000 0.38000Paving Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000
5.2.2. Mitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load FactorBuilding Construction Cranes Diesel Tier 4 Final 1.000000 7.00000 367.000 0.29000Building Construction Forklifts Diesel Tier 4 Final 3.00000 8.00000 82.0000 0.20000Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000Building Construction Tractors/Loaders/Back hoes
Diesel Tier 4 Final 3.00000 7.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000Paving Cement and Mortar Mixers
Diesel Average 2.00000 6.00000 10.00000 0.56000
Paving Pavers Diesel Tier 4 Final 1.000000 8.00000 81.0000 0.42000Paving Paving Equipment Diesel Tier 4 Final 2.00000 6.00000 89.0000 0.36000Paving Rollers Diesel Average 2.00000 6.00000 36.0000 0.38000Paving Tractors/Loaders/Back hoes
Diesel Tier 4 Final 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
55 / 69
5.3. Construction Vehicles5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixBuilding Construction Worker 4.72332 18.5000 LDA,LDT1,LDT2Building Construction Vendor 1.84322 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 20.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 0.94466 18.5000 LDA,LDT1,LDT2Architectural Coating Vendor — 10.2000 HHDT,MHDTArchitectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.3.2. Mitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle MixBuilding Construction Worker 4.72332 18.5000 LDA,LDT1,LDT2Building Construction Vendor 1.84322 10.2000 HHDT,MHDTBuilding Construction Hauling 0.00000 20.0000 HHDTBuilding Construction Onsite truck — — HHDTPaving Worker 20.0000 18.5000 LDA,LDT1,LDT2Paving Vendor — 10.2000 HHDT,MHDTPaving Hauling 0.00000 20.0000 HHDTPaving Onsite truck — — HHDTArchitectural Coating Worker 0.94466 18.5000 LDA,LDT1,LDT2 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
56 / 69
Architectural Coating Vendor — 10.2000 HHDT,MHDT
Architectural Coating Hauling 0.00000 20.0000 HHDTArchitectural Coating Onsite truck — — HHDT
5.4. Vehicles5.4.1. Construction Vehicle Control StrategiesNon-applicable. No control strategies activated by user.5.5. Architectural Coatings Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior AreaCoated (sq ft)
Non-Residential Interior AreaCoated (sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 16,869.0 5,623.00 —
5.6. Dust Mitigation5.6.1. Construction Earthmoving Activities Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres)Paving 0.00000 0.00000 0.00000 0.00000 0.00000
5.6.2. Construction Earthmoving Control StrategiesNon-applicable. No control strategies activated by user.5.7. Construction Paving Phase Name Land Use Area Paved (acres) % AsphaltPaving Arena 0.00000 0%
5.8. Construction Electricity Consumption and Emissions FactorskWh per Year and Emission Factor (lb/MWh) TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
57 / 69
Year kWh per Year CO2 CH4 N2O
2031 0.00000 531.983 0.03300 0.004002032 0.00000 531.983 0.03300 0.00400
5.9. Operational Mobile Sources5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearArena 280.025 280.025 280.025 102,209 3,034.35 3,034.35 3,034.35 1,107,539
5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/YearArena 248.105 248.105 248.105 90,558.5 2,688.47 2,688.47 2,688.47 981,291
5.10. Operational Area Sources5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number)Arena Wood Fireplaces 0 0Arena Gas Fireplaces 0 0Arena Propane Fireplaces 0 0Arena Electric Fireplaces 0 0Arena No Fireplaces 0 0Arena Conventional Wood Stoves 0 0Arena Catalytic Wood Stoves 0 0Arena Non-Catalytic Wood Stoves 0 0Arena Pellet Wood Stoves 0 0 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
58 / 69
5.10.2. Architectural Coatings
Residential Interior Area Coated (sqft)
Residential Exterior Area Coated (sqft)
Non-Residential Interior Area Coated(sq ft)
Non-Residential Exterior AreaCoated (sq ft)
Parking Area Coated (sq ft)
0.00000 0.00000 16,869.0 5,623.00 —
5.10.3. Landscape Equipment
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.10.4. Landscape Equipment - Mitigated
Season Unit ValueSnow Days day/yr 0.00000Summer Days day/yr 180.000
5.11. Operational Energy Consumption5.11.1. UnmitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Arena 104,576 260.788 0.0330 0.0040 479,639
5.11.2. MitigatedElectricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr)Arena 104,576 260.788 0.0330 0.0040 479,639 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
59 / 69
5.12. Operational Water and Wastewater Consumption5.12.1. Unmitigated Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Arena 4,844,441 12,927.6
5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year)Arena 4,844,441 12,927.6
5.13. Operational Waste Generation5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Arena 0.30949 0.00000
5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)Arena 0.30949 0.00000
5.14. Operational Refrigeration and Air Conditioning Equipment5.14.1. Unmitigated Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedArena Other commercial A/C and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
60 / 69
1.000000 0.00000 1.000000 0.03750 1,430.00 R-134a Arena Stand-alone retail refrigerators andfreezers
Arena Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
5.14.2. Mitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times ServicedArena Other commercial A/C and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Arena Stand-alone retail
refrigerators andfreezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
Arena Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
5.15. Operational Off-Road Equipment5.15.1. Unmitigated5.15.2. Mitigated5.16. Stationary Sources5.16.1. Emergency Generators and Fire Pumps5.16.2. Process Boilers5.17. User Defined5.18. Vegetation5.18.1. Land Use Change TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
61 / 69
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report6.1. Climate Risk SummaryCal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 whichassumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
62 / 69
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 14.8400 annual days of extreme heatExtreme Precipitation 6.90000 annual days with precipitation above 20 mmSea Level Rise — meters of inundation depthWildfire 25.7100 annual hectares burned Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures fromobserved historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall ifreceived over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), andconsider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled withextreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 metersWildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical dataof climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. Thefour simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range ofdifferent rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.6.2. Initial Climate Risk Scores Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1 0 0 N/AExtreme Precipitation N/A N/A N/A N/ASea Level Rise 1 0 0 N/AWildfire 1 0 0 N/AFlooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 0 0 0 N/A The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reductionmeasures.
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
63 / 69
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability ScoreTemperature and Extreme Heat 1112Extreme Precipitation N/A N/A N/A N/ASea Level Rise 1 1 1 2Wildfire 1112Flooding N/A N/A N/A N/ADrought N/A N/A N/A N/ASnowpack Reduction N/A N/A N/A N/AAir Quality Degradation 1112 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing thegreatest exposure.The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5representing the greatest ability to adapt.The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reductionmeasures.6.4. Climate Risk Reduction Measures7. Health and Equity Details7.1. CalEnviroScreen 4.0 ScoresThe maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census TractExposure Indicators —AQ-Ozone 59.6889AQ-PM 41.1450AQ-DPM 81.7299Drinking Water 59.7727Lead Risk Housing 33.5854 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
64 / 69
Pesticides 0.00000
Toxic Releases 25.9565Traffic 86.6500Effect Indicators —CleanUp Sites 0.00000Groundwater 22.1152Haz Waste Facilities/Generators 40.1324Impaired Water Bodies 86.9593Solid Waste 52.8981Sensitive Population —Asthma 14.7931Cardio-vascular 19.4791Low Birth Weights 52.5404Socioeconomic Factor Indicators —Education 71.7540Housing 87.8834Linguistic 38.1378Poverty 46.6080Unemployment 60.5674
7.2. Healthy Places Index ScoresThe maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census TractEconomic —Above Poverty 43.9753625Employed 80.73912486Median HI 26.34415501Education — TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
65 / 69
Bachelor's or higher 52.44450148
High school enrollment 100Preschool enrollment 77.6337739Transportation —Auto Access 18.65776979Active commuting 53.41973566Social —2-parent households 9.418709098Voting 62.64596433Neighborhood —Alcohol availability 21.69896061Park access 81.35506224Retail density 88.31002181Supermarket access 73.66867702Tree canopy 65.52033877Housing —Homeownership 22.10958553Housing habitability 14.59001668Low-inc homeowner severe housing cost burden 6.120877711Low-inc renter severe housing cost burden 37.22571539Uncrowded housing 61.41408957Health Outcomes —Insured adults 34.59514949Arthritis 45.8Asthma ER Admissions 80.1High Blood Pressure 39.5Cancer (excluding skin) 34.5Asthma 37.3 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
66 / 69
Coronary Heart Disease 43.7
Chronic Obstructive Pulmonary Disease 35.3Diagnosed Diabetes 70.5Life Expectancy at Birth 24.2Cognitively Disabled 16.7Physically Disabled 26.6Heart Attack ER Admissions 63.6Mental Health Not Good 43.4Chronic Kidney Disease 55.3Obesity 47.8Pedestrian Injuries 48.7Physical Health Not Good 46.9Stroke 45.2Health Risk Behaviors —Binge Drinking 26.9Current Smoker 45.9No Leisure Time for Physical Activity 48.0Climate Change Exposures —Wildfire Risk 17.9SLR Inundation Area 0.0Children 64.0Elderly 47.3English Speaking 51.5Foreign-born 55.9Outdoor Workers 82.9Climate Change Adaptive Capacity —Impervious Surface Cover 64.0Traffic Density 94.4 TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
67 / 69
Traffic Access 23.0
Other Indices —Hardship 53.4Other Decision Support —2016 Voting 69.3
7.3. Overall Health & Equity Scores
Metric Result for Project Census TractCalEnviroScreen 4.0 Score for Project Location (a) 51.0000Healthy Places Index Score for Project Location (b) 47.0000Project Located in a Designated Disadvantaged Community (Senate Bill 535) NoProject Located in a Low-Income Community (Assembly Bill 1550) YesProject Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.7.4. Health & Equity MeasuresNo Health & Equity Measures selected.7.5. Evaluation ScorecardHealth & Equity Evaluation Scorecard not completed.7.6. Health & Equity Custom MeasuresNo Health & Equity Custom Measures created.8. User Changes to Default Data8.1. Justifications Screen JustificationConstruction: Construction Phases As per the applicant TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
68 / 69
Construction: Off-Road Equipment As per MM AQ-1
Operations: Vehicle Data As per the updated Traffic Study
8.4. Construction8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New ValueBuilding Construction Building Construction Start Date 7/20/2031 6/1/2031Building Construction Building Construction End Date 6/6/2032 12/30/2032Building Construction Building Construction Work Days per Phase 230.000 414.000Paving Paving Start Date 6/7/2032 8/01/2032Paving Paving End Date 7/2/2032 10/31/2032Paving Paving Work Days per Phase 18.0000 65.0000Architectural Coating Architectural Coating Start Date 7/3/2032 9/01/2032Architectural Coating Architectural Coating End Date 7/28/2032 9/30/2032Architectural Coating Architectural Coating Work Days per Phase 18.0000 22.0000
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New ValueBuilding Construction Cranes Engine Tier Average Tier 4 FinalBuilding Construction Forklifts Engine Tier Average Tier 4 FinalBuilding Construction Tractors/Loaders/Backhoes Engine Tier Average Tier 4 FinalPaving Pavers Engine Tier Average Tier 4 FinalPaving Paving Equipment Engine Tier Average Tier 4 FinalPaving Tractors/Loaders/Backhoes Engine Tier Average Tier 4 Final
8.5. Operations
TODSP Phase 3 Mitigated Detailed Report, 4/28/2026
69 / 69
8.5.1. Mobile Sources8.5.1.1. Vehicle Data
Land Use Model Parameter Units Default Value New ValueArena Weekday Trip Rate size/day 10.7132 24.9000Arena Saturday Trip Rate size/day 10.7132 24.9000Arena Sunday Trip Rate size/day 10.7132 24.9000
ATTACHMENTS DOWNTOWN THOUSAND OAKS PROJECT FINAL ENVIRONMENTAL IMPACT REPORT
CSG CONSULTANTS
Attachment 2
Updated SP-11
CITY OF THOUSAND OAKS
CIVIC ARTS PLAZA
SPECIFIC PLAN
APRIL 21, 2026
PUBLIC REVIEW DRAFT
(SPECIFIC PLAN 11)
Cover Image: Conceptual view of
Carpenter Park improvements.
PREPARED FOR
PREPARED BY
ACKNOWLEDGMENTS
CITY COUNCIL
Mikey Taylor, Mayor
Bob Engler, Mayor Pro Tem
Al Adam, Councilmember, District 4
C. Tie Gutierrez, Councilmember, District 5
David Newman, Councilmember-At-Large
PLANNING COMMISSION
Marcella Ketelhut, Chair
Kara Buss, Vice Chair
Mic Farris, Commissioner
Don Lanson, Commissioner
Sharon McMahon, Commissioner
CITY STAFF
Andrew Powers, City Manager
Akbar Alikhan, Deputy City Manager
Kelvin Parker, Community Development Director
Fabiola Zelaya Melicher, AICP, Deputy Community Development Director Krystin Rice, Planning Division Manager
Justine Kendall, AICP, Senior Planner
Alexandra South, Strategic Communications and Public Affairs Director Jonathan Serret, Cultural and Community Services Director Joshua Koenig-Brown, Facilities Manager
Cliff Finley, Director of Public Works
Nader Heydari, Director of Public Works
Melissa Hurtado, Deputy Community Services Director
&
TABLE OF CONTENTS
INTRODUCTION
A Purpose and Organization of the Specific Plan
B Authority for the Specific Plan
C Planning Area Character
D Project Setting and Context
E Background
F Relationship to Other City Policy Documents
I. General Plan
II. Protected Tree Preservation and Protection
III. Freeway Corridor Design Guidelines
IV. Thousand Oaks Boulevard Specific Plan (SP-20)
V. Climate and Environmental Action Plan
G General Plan Consistency
H Vision and Guiding Objectives
PLANNING ELEMENTS AND
DEVELOPMENT REGULATIONS
A General Provisions
B Land Use and Zoning
C Establishment of Subareas
I. Subareas A and D (The Lakes)
II. Subareas B, C, and E (Downtown Core)
D The Lakes (Subareas A and D)
I. Subarea A: Private Commercial/Residential
II. Subarea D: Ponds
III. Subareas A and D Design Criteria
IV. Circulation and Parking
V. Special Features
VI. Infrastructure and Public Improvements
VII. Administration and Implementation
1-1
1-2
1-3
1-4
1-8
1-10
1-10
1-10
1-11
1-11
1-11
1-12
1-13
2-1
2-1
2-2
2-2
2-4
2-6
2-6
2-14
2-16
2-19
2-20
2-22
2-23
02 01
E The Downtown Core (Subareas B, C, and E)
I. Subarea B: Carpenter Park
II. Subarea C: Civic Arts Plaza
III. Subarea E: Westside
IV. Downtown Core Development Regulations
V. Circulation and Mobility
VI. Pedestrian Connectivity and Public Realm
VII. Infrastructure and Public Facilities
VIII. Administration and Implementation
APPENDICES
A General Plan Consistency A-1
02 TABLE OF CONTENTS
PLANNING ELEMENTS AND
DEVELOPMENT REGULATIONS
2-26
2-30
2-32
2-34
2-36
2-60
2-85
2-99
2-110
A
FIGURE AND TABLE LIST
FIGURES
Figure 1-1: Regional Location Map
Figure 1-2: Vicinity Map
Figure 1-3: Specific Plan Boundary
Figure 2-1: CAPSP Land Use Map
Figure 2-2: CAPSP Zoning Designation Map
Figure 2-3: Subareas Map
Figure 2-4: Downtown Core Conceptual Site Plan
Figure 2-5: Civic Arts Plaza Program Components
Figure 2-6: Building Heights
Figure 2-7: Circulation and Parking Plan
Figure 2-8: The Lakes Drive Cross Section
Figure 2-9: West Road Cross Section
Figure 2-10: West Main Street Cross Section
Figure 2-11: Dallas Drive Cross Section
Figure 2-12: Oakwood Drive Cross Section
Figure 2-13: East Main Street Cross Section
Figure 2-14: Pedestrian Connectivity and Nodes
Figure 2-15: Conceptual Gateways and Wayfinding Signage Map Figure 2-16: Conceptual Site Lighting Locations
Figure 2-17: Conceptual Public Art Location Map
Figure 2-18: Infrastructure Plan (Water)
Figure 2-19: Infrastructure Plan (Wastewater)
Figure 2-20: Infrastructure Plan (Stormwater Drainage)
Figure 2-21: Downtown Core Phasing Plan
TABLES
Table 2.1: Subarea Land Use Designations
Table 2.2: Downtown Core Permitted Uses
Table 2.3: Downtown Core Development Standards
Table 2.4: Mixed-Use Residential Objective Design Standards Table 2.5: Downtown Core Shared Parking Pool Inventory
Table 2.6: Downtown Core Lighting Standards by Region
Table 2.7: Estimated Cubic Yards of Earthwork by Phase
Table 2.8: Downtown Core Implementation Programs
1-5
1-6
1-7
2-2
2-37
2-42
2-48
2-78
2-94
2-105
2-119
2-3
2-4
2-5
2-27
2-33
2-45
2-60
2-63
2-65
2-66
2-68
2-70
2-71
2-89
2-90
2-93
2-97
2-100
2-101
2-103
2-113
CHAPTER ONE
INTRODUCTION
01 The vision for the Downtown
Core is to be a vibrant,
inclusive, economically
viable, and connected
community that prioritizes
walkability, supports
local businesses and
entrepreneurs, and fosters
a strong sense of place.
Conceptual view of Downtown Core public gathering
area proposed at Carpenter Park.
City of Thousand Oaks 1-1
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
CHAPTER ONE
A. PURPOSE AND
ORGANIZATION OF THE SPECIFIC
PLAN
The Civic Arts Plaza Specific Plan (CAPSP) is a
comprehensive guide to defining the character of
future physical development and outlines a vision
for land use, infrastructure, and implementation
strategies for the portion of the General Plan 2045
Downtown Sub Area Plan1
between West Road
and South Conejo School Road, along the southern
frontage of Thousand Oaks Boulevard in the City of
Thousand Oaks.
These standards set forth appropriate uses within the
CAPSP area, as well as regulations for appearance,
scale, and quality of development. The Specific Plan
provides the opportunity to create a framework for
proposed development, in order to avoid piecemeal
and fragmented development that ensures future
compatibility with the surrounding neighborhoods.
This Specific Plan is consistent with the adopted City
of Thousand Oaks General Plan and serves as an
implementation framework for the General Plan, as it
affects the project site.
Existing on-site oak tree.
1 Refer to Figure 4.6 in the Land
Use Element of the General Plan.
1-2
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
The CAPSP is organized into two chapters:
Chapter 1: Introduction
This chapter provides an introduction
and overview to the CAPSP area and
defines the legal authority provided
under California Government Code
Section 65450-65457. The chapter also
describes the project background, vision,
and objectives.
Chapter 2: Planning Elements and
Development Standards
This chapter stipulates the permitted
land uses and development standards
applicable to the CAPSP. The chapter
also describes the circulation and
mobility, streetscape, infrastructure,
and public services that will serve the
CAPSP area. The CAPSP also consists
of implementation and administrative
procedures controlling the CAPSP
adjustments and amendments.
B. AUTHORITY FOR THE SPECIFIC PLAN
The CAPSP is established through the authority granted to the City of Thousand Oaks by California Government Code, Title 7, Division 1, Chapter 3, Article 9, Sections 65450 through 65457 (specific plans), and provisions of Thousand Oaks Municipal Code. The California Government Code establishes the authority for a legislative body to adopt an ordinance or resolution requiring that a Specific Plan be prepared to serve the public interest.
A specific plan is a legislative planning tool, regulatory in nature, and serves as zoning law for the properties involved. Development plans, site plans, and tentative tract/parcel plans must be consistent with both the Specific Plan and the City’s General Plan. The Specific Plan shall be adopted by ordinance of the City Council. Thereafter, the Specific Plan may be amended in accordance with the procedures outlined in Section 2.D.VII and Section 2.E.VIII, both titled – Administration and Implementation.
The CAPSP shall include text and exhibits that specify all of the following in detail, as required by California Government Code (Section 65451):
• The distribution, location, and extent of the uses of land, including open space, within the area covered by the CAPSP.
• The proposed distribution, location, extent, and intensity of major components of public and private transportation, sewage, water, drainage, solid waste disposal, energy, and other essential facilities proposed to be located within the Specific Plan Area and needed to support land uses described in the plan.
• Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable.
City of Thousand Oaks 1-3
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
• A program of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out paragraphs (a), (b), and (c). • A statement of the relationship of the Specific Plan to the General Plan.
The provisions of this CAPSP are intended to be consistent with all applicable provisions of state law. In the event of any conflict or inconsistency between this CAPSP and state law, the applicable provisions of state law shall prevail, and this CAPSP shall be interpreted and applied in a manner consistent with such law.
C. PLANNING AREA CHARACTER
The CAPSP boundaries comprise the following parcels:
• 19 complete parcels (assessor’s parcel numbers (APNs): 670-0-182-230; 670-0-182- 190; 670-0-182-060; 670-0-182-220; 670-0-182-210; 670-0-181-140; 670-0-181-350; 670-0-181-360; 670-0-181-235; 670-0-181-340; 671-0-240-450; 670-0-181-090; 670- 0-181-250; 670-0-181-260; 670-0-181-270; 670-0-181-110; 671-0-240-460; 671-0-240- 475; and 671-0-240-485
• Two public right-of-way segments: Dallas Drive and Oakwood Drive Regional access to the site is provided by Highway 101 and Moorpark Freeway (SR 23) from the north. Local access to the Specific Plan area is provided from Thousand Oaks Boulevard, Conejo School Road, and Erbes Road.
Existing development within the Specific Plan area includes “The Lakes at Thousand Oaks” and the Civic Arts Plaza (CAP), a prominent civic and cultural facility within the City of Thousand Oaks.
“The Lakes at Thousand Oaks” currently consists of a 48,000-square-foot shopping center with two lakes and a children’s playground, and potential future multifamily residential development as approved by City Council November 30, 2021.
The CAP includes the Bank of America Performing Arts Center, which comprises the 1,800-seat Fred Kavli Theatre and the 394-seat Scherr Forum Theatre, the latter of which also functions as the current City Council Chambers. In addition, the CAP includes City Hall administrative offices for the City of Thousand Oaks, a police outpost, a public County Clerk office, and other leasable office space. The CAP is distinguished by its notable architectural design and features a variety of public outdoor spaces and terraces.
1-4
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
D. PROJECT SETTING AND CONTEXT
The CAPSP area is centrally located within the City of Thousand Oaks in eastern Ventura County (Figure 1-1). Specifically, the CAPSP encompasses approximately 27 acres at the southwest corner of Thousand Oaks Boulevard and Conejo School Road. Located within the predominantly commercial corridor of Thousand Oaks Boulevard, the plan area is designated for commercial, mixed-use, institutional, and parks and open space land uses in the Thousand Oaks General Plan. The boundaries of the CAPSP area are shown in Figure 1-3.
The CAPSP area is generally rectangular in shape and features terrain which slopes down from Highway 101 along the southern boundary toward Thousand Oaks Boulevard along the north boundary. Notable landform features include an artificially-terraced knoll in the south-east corner and a 30- to 40-foot fill slope along the southern boundary adjacent to Highway 101.
A large Ventura County flood control box culvert snakes east to west across the site. Surface elevations vary significantly, ranging from 808 feet above sea level in the northwest section to 898 feet above sea level at the summit of the knoll in the southeast corner.
The area is underlain by two Miocene-age bedrock formations. Conejo Volcanics bedrock underlies the southern portion and is exposed at the surface in the southwestern part of the site.
The Topanga Formation underlies the central and northern portions, covered with alluvium and fill deposits. High groundwater levels have been observed near the watercourses, with springs and seeps common in the Conejo Volcanics during wet winter months.
Natural vegetation on the site was previously disturbed as a result of prior uses of the property and has been partially replaced by the improvements constructed within the CAPSP area. The dominant plant community that exists on the undeveloped portion of the site is oak savannah, which is typified by widely spaced oaks separated by annual grassland. A preliminary oak tree report prepared by Lee Newman and Associates, Inc., in 1987, identified 40 deciduous valley oaks (Quercus lobata) and eight coast live oaks (Quercus aqrifolia) on, or immediately adjacent to, the CAPSP area. Although many of the oaks identified were large, old specimens, a number of them exhibited external signs of disease and are only rated fair in terms of overall health and appearance. A number of non-native trees also exist on the eastern portion of the site, most dating from the time of the Jungleland Amusement Park. Due to the overall disturbance of the CAPSP area and its increasing isolation from larger reservoir habitats, the area exhibits declining importance to wildlife populations.
City of Thousand Oaks 1-5
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
The ephemeral streams and oaks within the CAPSP area represent environmental resources known to have been attractive to the prehistoric Chumash inhabitants. Numerous archaeological sites have been discovered in similar situations and, consequently, there is potential for buried cultural resources to exist within the CAPSP area. An initial field reconnaissance conducted prior to the initial Specific Plan adoption in 1989 failed to indicate the existence of any previously unknown cultural resources within the limits of the subject property. However, a record search found documented evidence of a location (labeled CA-VEN-654) on the property, which may be a possible source for artifacts reportedly found on the site by local residents. In order to explore the potential significance of this site, an archaeological team excavated a series of backhoe trenches in suspect fill areas and subsurface cultural remains were discovered. As a result of this discovery, an intensive test excavation was conducted and numerous artifacts were uncovered.
SPECIFIC
PLAN
AREA
7KRXVDQG2DNV%OYG
+LOOFUHVW'ULYH
(UEHV5G
/RV)HOL]'U
&RQHMR6FKRRO5G
/RV)HOL]'U
7KRXVDQG2DNV%OYG
+LOOFUHVW'ULYH
SPECIFIC
PLAN
AREA
+LOOFUHVW'ULYH
7KRXVDQG2DNV%OYG
(UEHV5G
Camarillo
Moorpark
Simi Valley Simi Valley
Thousand Oaks Thousand Oaks
Agoura Hills Agoura Hills
Westlake
Village
Westlake
Village
Ventura
County
Ventura
County
Ventura
County
Los Angeles County
County
7KRXVDQG2DNV&LW\/LPLWV
Figure 1-1: Regional Location Map
1-6
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
The site appears to have been a temporary or seasonal camp, which has been highly disturbed by prior grading activities. Excavation has indicated that very little of the deposit remains intact and the site is not particularly unique. It was the opinion of the archaeologists who undertook the salvage operation that all of the site’s materials and scientific data had been satisfactorily unearthed. Phase I and Extended Phase I cultural resources investigations conducted in 2025 further confirmed that there were no artifacts or archaeological features on the undeveloped portions of land that would contribute to the potential historical/archaeological significance of the area.
Major sources of background noise include Highway 101 to the south and traffic noises associated with Thousand Oaks Boulevard and other nearby streets. Ambient noise levels within the limits of the CAPSP exceed 63 dB(A).
Figure 1-2: Vicinity Map
7KRXVDQG2DNV%OYG
+LOOFUHVW'ULYH
(UEHV5G
/RV)HOL]'U
&RQHMR6FKRRO5G
/RV)HOL]'U
7KRXVDQG2DNV%OYG
+LOOFUHVW'ULYH
+LOOFUHVW'ULYH
7KRXVDQG2DNV%OYG
(UEHV5G
SPECIFIC
PLAN
AREA
6SHFLILF3ODQ%RXQGDU\
City of Thousand Oaks 1-7
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
Figure 1-3: Specific Plan Boundary
The City of Thousand Oaks and Ventura County are located within the South Central Coast Air Basin, which is governed by the Ventura County Air Pollution Control District (VCAPCD).
The principal air pollution problems in Thousand Oaks are particulate matter emissions which occasionally exceed state or federal standards in Ventura County.
Water service to the site is provided by the City of Thousand Oaks utilizing the Zone II (Freeway) system. Existing Zone II pipelines in Thousand Oaks Boulevard and Conejo School Road provide water service and adequate fire flow. Adequate wastewater, stormwater, natural gas, electrical, and telephone facilities also exist to serve the Specific Plan area. In the development of the CAP, infrastructure systems were improved to serve the entire Specific Plan area. 7KRXVDQG2DNV%OYG
&RQHMR6FKRRO5G
7KRXVDQG2DNV%OYG
&RQHMR6FKRRO5G
2DNZRRG'U 2DNZRRG'U
7KH/DNHV'U
7KH/DNHV'U
&RQHMR6FKR
&RQHMR6FKRRO
5 &RQHMR6FKRRO 5 6FKRRO
5 7KRXVDQG2DNV%OYG
7KRXVDQG2DNV%OYG
7KRXVDQG2DNV%OYG7KRXVDQG2DNV%OYG
7KH/DNHV'U
7KH/DNHV'U
2DNZRRG'U 2DNZRRG 'U 2DNZRRG'U 2D
FLILF3ODQ%RXQGDU\ 6SHFLILF3ODQ%RXQGDU\
1-8
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
E. BACKGROUND
The CAPSP was originally part of “Rancho El Conejo,” a Spanish land grant. Egbert Starr Newbury purchased 2,259 acres of this land in 1874. The land was sold to the Crowley family in 1887, who built a successful ranch on the land. The Crowley family lived on the ranch until 1922.
In 1925, Goebel purchased former Newbury/Crowley land where the Thousand Oaks Civic Arts Plaza currently stands and opened Goebel’s Lion Farm, where he trained lions and rented them to movie studios. The site became known as “Goebel’s Wild Animal Farm,” a theme park that became popular in the 1940s. Goebel sold the property in 1946 and the park was renamed the “World Jungle Compound.” Ten years later it was sold again to executives from 20th Century Fox and was renamed “Jungleland.” After five years, Goebel purchased it back in 1961. Jungleland then closed in 1969. Between 1969, when Jungleland was closed, and 1992, when the public buildings portion of the Civic Arts Plaza project began, the site was vacant. As a result of its colorful past as a local attraction, the Jungleland site has been designated as Ventura County Historical Landmark No. 63.
In 1979, the Thousand Oaks Boulevard Redevelopment Project was established and included the Jungleland property within the boundaries of the project area. The objectives of the Redevelopment Plan include the elimination of blighting influences, the provision of necessary site improvements to stimulate development and the improvement of the economic and cultural environment of the area. In 1982, the City’s General Plan Review Committee recommended a combination of mixed commercial and residential uses for the Jungleland area within a height overlay district.
City of Thousand Oaks 1-9
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
Following that City Council recommendation, the Civic Arts Plaza Specific Plan (CAPSP)/ Specific Plan No. 11 (SP-11) was adopted on September 19, 1989, and most of the site was acquired by the Thousand Oaks Redevelopment Agency in 1990 for redevelopment consistent with SP-11.
SP-11 has been amended several times since 1989 as follows:
• Amendment No. 1: Approved on April
21, 1992, to permit a greater height of
the Civic Auditorium (Kavli Theatre),
reconfigure vehicular circulation, and
expand the CAPSP boundary to include
additional property to the west.
• Amendment No. 2: Approved by City
Council on March 9, 2004, to incorporate
the construction of a private commercial
shopping center (The Lakes) and future
potential Discovery Center project.
• Amendment No. 3 (SPA 2010-70056):
Approved by City Council on May 11,
2010, to allow angled parking within the
Pond Parcel (Sub-Area D).
• Amendment No. 4 (SPA 2011-70570):
Approved by City Council on April 10,
2012, to change the parking standards
for restaurant and retail uses within
Sub-Area A (Private Commercial), to be
consistent with the parking standards of
the Thousand Oaks Boulevard Specific
Plan (SP-20).
• Amendment No. 5 (SPA 2012-70019):
Approved by City Council on April 24,
2012, to remove adjacent properties
acquired by the City in 2010 and 2011
from SP-20 and incorporate into SP-11.
• Amendment No. 6 (SPA 2021-70436):
Approved by City Council on November
30, 2021, to modify and establish specific
development standards for a 165-unit
residential project at The Lakes.
• Amendment No. 7: Approved on June
23, 2026, by City Council to revise SP11 subarea boundaries, associated subarea acreages, text, exhibits
regarding development and design
standards, and procedures for minor or
major changes to entitlements under
SP-11, specifically within the proposed
new Downtown Core Subarea (i.e.,
Subareas B, C, and E) between Conejo
School Road and the western project
boundary.
1-10
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
F. RELATIONSHIP TO OTHER CITY POLICY DOCUMENTS
Upon adoption by ordinance by the City of Thousand Oaks City Council, the CAPSP will serve as zoning for the properties within the CAPSP boundaries. The regulations and provisions in the CAPSP take precedence over any conflicting provisions and regulations in the Thousand Oaks Municipal Code (TOMC) and Thousand Oaks Boulevard Specific Plan (SP-20) that govern the same subject matter.
I. GENERAL PLAN
Adopted December 5, 2023, the City of Thousand Oaks 2045 General Plan functions as a comprehensive guide that captures the City’s long-term vision, outlining goals, policies, and strategies to direct its future development. This framework equips City staff and decision-makers with the tools to direct growth and transformation in a way that aligns with the City’s overarching objectives. The General Plan takes a multi-faceted approach to planning, addressing critical areas such as land use, circulation and mobility, housing, open space, conservation, public safety, noise management, cultural and historic preservation, economic development, and infrastructure.
The Land Use Element presents a vision for future development within the CAPSP area. The CAPSP serves as a targeted framework to provide detailed guidance and regulation for development, ensuring that future projects adhere to the land use vision and established General Plan goals and policies.
Upon adoption, the property will have various land use designations (Mixed-Use, Institutional, and Parks, Golf Courses, Open Space) and a Specific Plan (SP) Zoning Designation. Refer to Figure 2-1 (CAPSP Land Use Map) and Figure 2-2 (CAPSP Zoning Designation Map). Appendix A provides a detailed analysis demonstrating the relationship of the CAPSP and how it achieves and is consistent with the General Plan goals and policies.
II. PROTECTED TREE PRESERVATION AND PROTECTION
The TOMC outlines regulations for preserving existing protected trees within the City. The regulations mandate the preservation of all healthy protected tree species, but allow the removal, pruning, or encroachment under certain circumstances, such as when necessary for tree health or safety, to prevent substantial property damage, or to allow for the reasonable and conforming use of the property. All sections of the TOMC related to the protection of trees will continue to apply upon the adoption of this Specific Plan.
City of Thousand Oaks 1-11
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
III. FREEWAY CORRIDOR DESIGN GUIDELINES
The City of Thousand Oaks has adopted guidelines (Resolution No. 91-172) for the development of properties located wholly or partially within 1,000 feet of the centerlines of the 101 and 23 Freeways. These guidelines are crafted to enhance the image of Thousand Oaks when viewed from the freeway corridors. The guidelines provide urban design policies that will create an attractive view for both residents and visitors while maintaining the character of the City.
Parcels or projects within the Specific Plan area applicable under these provisions shall be subject to the Freeway Corridor Design Guidelines.
IV. THOUSAND OAKS BOULEVARD SPECIFIC PLAN (SP-20)
SP-20 governs the development of 342 acres located along Thousand Oaks Boulevard, between Moorpark Road and Auto Mall Drive. SP-20 aims to create a consistent and identifiable commercial corridor and streetscape within the City. The area regulated by SP-20 is not part of this Specific Plan. Areas within the public right-of-way of Thousand Oaks Boulevard adjacent to the CAPSP are within and regulated by SP-20.
V. CLIMATE AND ENVIRONMENTAL ACTION PLAN
The City’s 2024 Climate and Environmental Action Plan (CEAP, “Plan”) details the goals and actions that the City will pursue to protect the environment and address the challenges of climate change. The CEAP was developed as an implementation action of the City’s General Plan 2045, and outlines sector-specific strategies across building energy, transportation, solid waste, water, and environmental adaptation. The CEAP is an aspirational document that identifies future City regulations to be considered, which, if implemented, could apply to projects or actions that take place within the CAPSP area. Future development under CAPSP will also be subject to the CEAP’s monitoring framework—including annual greenhouse gas (GHG) inventories and Key Performance Indicators (KPIs).
1-12
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
G. GENERAL PLAN CONSISTENCY
The CAPSP aligns with and advances the objectives of the City of Thousand Oaks 2045 General Plan (referred to as the “General Plan”). The General Plan Downtown Sub Area Plan promotes the creation of vibrant, pedestrian-oriented commercial and residential uses, along with institutional, entertainment, and civic uses. The Specific Plan implements this by establishing detailed regulations and guidelines for the development of designated sites and streetscape enhancements within its boundaries.
The CAPSP vision, goals, and implementation strategies are directly informed by the policy direction set forth in the General Plan. By offering a more focused framework, the CAPSP enables precise application of the General Plan’s guiding principles, goals, policies, and objectives. It has been crafted to support and reinforce relevant elements of the General Plan. Appendix A provides a detailed analysis of the Specific Plan’s consistency with relevant General Plan goals and policies.
Conceptual view of the central plaza.
City of Thousand Oaks 1-13
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
H. VISION AND GUIDING OBJECTIVES
In line with the original City Council vision for the area, the primary goal of the CAPSP, since its adoption, has been to develop a distinctive, high-quality downtown that serves as a centerpiece for Thousand Oaks and the Conejo Valley, while stimulating economic growth and revitalization in the area, emphasizing the importance of fostering a dynamic and attractive downtown environment.
The vision statement below was prepared as a result of the community outreach process conducted during the preparation for CAPSP Amendment No. 7 (SP-2025-70001):
Community Conversation - Arts and Entertainment.
The insights and visual summaries from the community workshops “Community Conversations” graphics below identified priorities, opportunities, and concerns from the community and helped to shape the overall vision for the Civic Arts Plaza Specific Plan.
The vision for the CAPSP is to be a vibrant, inclusive, economically viable, and connected community that prioritizes walkability, supports local businesses and entrepreneurs, and fosters a strong sense of place. The City is committed to enhancing accessibility and affordability, improving transit and mobility options, and creating flexible, welcoming public spaces that reflect the diversity, demographics, and character of the community.
Recognizing the critical need for housing, the City is dedicated to providing additional housing supply, ensuring Downtown Thousand Oaks remains a livable and equitable place for everyone. This vision honors the connection to the surrounding environment and the unique identity of the City.
1-14
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
Community Conversation - Sustainability.
Community Conversation - Accessibility and Disabled Access.
City of Thousand Oaks 1-15
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
Community Conversation - Visitor Experience and Business Mix.
Community Conversation - Landscape Architecture.
1.1 1.2
1.3 1.4
OBJECTIVES
1-16
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
Derived from the City’s 2045 General Plan, and extensive community input, the CAPSP reflects the following core goals:
Enhance public life and visitor experience by creating a network of open spaces and gathering areas for all ages, with formal and informal programming.
Celebrate the local arts community and represent the diversity of artistic media, including performing arts, visual arts, music, culinary arts, and others.
Create flexible public spaces that can accommodate community and cultural events such as a farmer’s market and other seasonal events, and formal and informal community performances and gatherings.
Renovate and rehabilitate the existing City Hall administrative offices in a manner that facilitates improved City service delivery, public wayfinding, governmental transparency and accessibility, and encourages public participation in civic life.
GOAL 1:
Establish the Civic Arts Plaza Specific Plan area as the go-to destination for civic life, arts, culture, and entertainment.
City of Thousand Oaks 1-17
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
Integrate residential uses to foster consistent activity within the CAPSP, particularly during the daytime, nighttime, and weekdays.
Facilitate a new hotel use adjacent to the Kavli Theatre to serve the performing arts venues on the site for visitors and/or performers, increase daily visitors, and provide additional tax revenues to the City.
Create robust and versatile public gathering spaces throughout the program that can be activated during various times of the day and enjoyed by residents of all age groups.
Promote economically viable uses that are synergistic with the arts, food, performance venues, and other community-focused uses within the CAPSP.
Foster a symbiotic relationship between the hotel and the cultural arts facilities through access, connectivity, place-based branding, design of the hotel use, and synergistic commercial uses and amenities.
OBJECTIVES
2.1 2.2
2.3 GOAL 2:
Catalyze economic vitality and ensure economic sustainability by attracting a critical mass of daily users to support local businesses.
2.4 2.5
1-18
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
Provide a grand staircase to link Thousand Oaks Boulevard to the Kavli Theatre and create a prominent physical and visual gateway to the Civic Arts Plaza.
Create a new pedestrian-oriented “Main Street” that is activated by groundfloor commercial uses across the site, connecting the mixed-use and commercial uses within Subarea E, the Civic and Arts uses in Subareas B and C, and commercial and residential uses within Subareas A and D.
Provide comfortable and engaging pedestrian access across the entire site with an emphasis on future connections to uses beyond the plan area boundaries.
Celebrate community interaction through an interconnected network of open spaces and gathering areas for all ages, with formal and informal programming.
Emphasize permeability from Thousand Oaks Boulevard to Main Street and public parking areas through separated buildings, varied architectural forms, terraces, and rooftop common areas.
Reduce reliance on individual on-site parking by implementing a park-once strategy that enables visitors, employees, and residents to access multiple designations within walking distance from a single parking location.
OBJECTIVES
3.1 3.2
3.3 GOAL 3:
Prioritize the pedestrian experience with walkable streets, “park-once” strategies, and active ground-floor uses.
3.4 3.5
3.6 Internal plaza perspective rendering.
City of Thousand Oaks 1-19
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
1-20
CHAPTER ONE 01 INTRODUCTION
April 21, 2026
PUBLIC REVIEW DRAFT
GOAL 4:
Honor local history and landscape, integrating oak and landmark trees, existing civic architecture, and cultural memory.
Preserve and celebrate existing mature protected trees on site in key public areas of the program.
Achieve design excellence and the creation of a unique sense of place by blending local history and landscape with a future-forward vision of Thousand Oaks.
Promote sustainable and context-sensitive development through thoughtful planning concepts and design requirements, integrated utility design, and environmentally responsible building practices.
OBJECTIVES
4.1 4.2
4.3 City of Thousand Oaks 1-21
CIVIC ARTS PLAZA SPECIFIC PLAN
INTRODUCTION
GOAL 5:
Ensure long-term economic viability of the Downtown Core Subareas through phased implementation and fiduciary stewardship.
Seek partnerships with developers aligned with long-term vision and goals for the Downtown.
Balance public expenditure on public benefits with commercially viable uses to promote long-term economic sustainability and commercial reinvestment into the Downtown.
Establish coordinated public and private implementation programs to implement the CAPSP.
Plan for comprehensive infrastructure improvements to support the maximum growth scenario of the Specific Plan.
OBJECTIVES
5.1 5.2
5.3 5.4
CHAPTER TWO
PLANNING ELEMENTS
AND DEVELOPMENT
REGULATIONS
02 The Civic Arts Plaza
6SHFLÀF3ODQ
&$363
establishes a framework
IRUWKH6SHFLÀF3ODQDUHD
WREHFRPHDG\QDPLF
DQGYHUVDWLOHXUEDQ
HQYLURQPHQWIUDPHGE\
FLYLFFXOWXUDOUHVLGHQWLDO
DQGFRPPHUFLDOXVHV
UHVXOWLQJLQDQHZFLYLF
KHDUWIRU'RZQWRZQ
Conceptual view of the amphitheatre stage area.
2-1
PLANNING ELEMENTS AND DEVELOPMENT STANDARDS
City of Thousand Oaks
CIVIC ARTS PLAZA SPECIFIC PLAN
CHAPTER TWO
A. GENERAL PROVISIONS
This chapter provides the permitted uses, development
standards, and other zoning regulations that apply
within the CAPSP area. All development within
the Specific Plan boundary must comply with the
requirements of the CAPSP. If there is any conflict
between the CAPSP and the TOMC, the CAPSP
standards shall prevail. Where the language in the
CAPSP is undefined, the final interpretation and
determination shall be made by the City’s Community
Development Director.
This chapter also outlines the circulation, mobility,
streetscape, infrastructure, and public services for the CAPSP area, while also detailing the implementation
and administrative procedures governing its
adjustments and amendments.
B. LAND USE AND ZONING
Land use represents the land use designation of each
subarea within the CAPSP boundary. The land use
designation represents the intended uses for various
components of the Specific Plan area as defined in
the General Plan. The CAPSP includes the following
General Plan land use designations:
• “Parks, Golf Courses, and Open Space”
• “Institutional”
• “Mixed-Use”
All parcels within the CAPSP are zoned Specific Plan
No. 11 and are regulated by the development standards
Outdoor seating area adjacent mixed use and policies established herein. perspective rendering.
2-2
CHAPTER TWO
PLANNING ELEMENTS AND 02 DEVELOPMENT STANDARDS
April 21, 2026
PUBLIC REVIEW DRAFT
C. ESTABLISHMENT OF SUBAREAS
The CAPSP area has been divided into five subareas, which are generally split into two development components: 1) The Lakes - consisting of Subareas A and D, and 2) the Downtown Core - consisting of Subareas B, C, and E. The subareas and their associated land use designations are displayed in Table 2.1, as well as Figures 2-1 and 2-3.
Table 2.1: Subarea Land Use Designations
SUBAREA GP LAND USE
DESIGNATION
ACREAGE REFERENCE
NAME
DESCRIPTION
Subarea A Mixed-Use 7.50 The Lakes Commercial and
Residential Development
Subarea B Institutional 3.76 Downtown
Core/ Carpenter
Park
Amphitheatre, Play
Spaces, Restaurant,
Promenades
Subarea C Institutional 8.55 Downtown
Core/ Civic Arts
Plaza
Theatres, City Hall,
Commercial, and Public
Market
Subarea D Parks, Golf
Courses, Open
Space
2.50 The Lakes Ponds and Open
Amenity Space
Subarea E Mixed-Use 5.33 Downtown
Core/ Westside
Mixed-Use Apartments
and Hotel
Note: Acreages indicated are approximations due to rounding.
I. SUBAREAS A AND D (THE LAKES)
The Lakes shopping center, located in Subarea A, consists of an integrated mixed-use commercial and residential complex, including various commercial uses such as restaurants, retail, multi-family residential development, and accessory uses and structures, which would complement the performing arts and theatre venues.
2-3
PLANNING ELEMENTS AND DEVELOPMENT STANDARDS
City of Thousand Oaks
CIVIC ARTS PLAZA SPECIFIC PLAN
7KH/DNHV'U
2DNZRRG'U
&RQHMR6FKRRO5G
7KRXVDQG2DNV%OYG
A
D
B
C
E
Mobile Home Exclusive
RESIDENTIAL
Mixed Use
(>20 to 30 du/ac, 1.0 FAR)
MIXED USE
Commercial Neighborhood
(0.5 FAR)
COMMERCIAL
Institutional
OTHER
Neighborhood Medium 2
(>15 to 20 du/acre)
Neighborhood High
(>20 to 30 du/acre)
Parks, Golf Courses,
Open Space Not to Scale
GENERAL PLAN LAND USE
Specific Plan-11 Boundary
Subarea Boundary
The Thousand Oaks Boulevard frontage, north of Subarea A, contains two ponds, which may be used as a seasonal ice-skating rink, and which can be viewed from the commercial complex in Subarea A. Because of the use of this area as a public amenity, it is designated as Subarea D, to distinguish it from the adjacent private development of Subarea A. The pond area is intended primarily for passive recreational purposes and as a visual amenity, to be used in a manner consistent with the conservation of landscape values and the enhancement of public enjoyment.
Figure 2-1: CAPSP Land Use Map
2-4
CHAPTER TWO
PLANNING ELEMENTS AND 02 DEVELOPMENT STANDARDS
April 21, 2026
PUBLIC REVIEW DRAFT
Figure 2-2: CAPSP Zoning Designation Map
SPECIFIC PLAN-11
OS
OS
M-1
TPD
TPD
RPD
RPD
MUOZ
MUOZ
MUOZ
MUOZ
MUOZ
R-O
7KRXVDQG2DNV%OYG
&RQHMR6FKRRO5G
2DNZRRG'U
RESIDENTIAL
MUOZ Mixed-Use Overlay
NON-RESIDENTIAL
RPD Residential Planned Development
Not to Scale
ZONING DESIGNATIONS
Specific Plan-11
R-O Single Family Estate
TPD Trailer Park Development
M-1 Industrial Park
OS Open Space
Specific Plan-20
II. SUBAREAS B, C, AND E (DOWNTOWN CORE)
The Downtown Core consists of Subareas B, C, and E of the CAPSP. Consistent with the Thousand Oaks General Plan 2045, this area is intended to become the nucleus of a walkable, mixed-use, and culturally-rich downtown neighborhood along Thousand Oaks Boulevard spanning from roughly Conejo School Road to Erbes Road. The development of the Downtown Core, including the revitalization of the existing CAP, is envisioned to catalyze the redevelopment of surrounding properties consistent with the goals and intent of the General Plan. 2-5
PLANNING ELEMENTS AND DEVELOPMENT STANDARDS
City of Thousand Oaks
CIVIC ARTS PLAZA SPECIFIC PLAN
Figure 2-3: Subareas Map
7KH/DNHV'U
2DNZRRG'U
&RQHMR6FKRRO5G
7KRXVDQG2DNV%OYG
7K
7KRXVDQG2DNV%OYG
7 A
D
B
C
E
)7
6SHFLILF3ODQ%RXQGDU\
6SHFLILF3ODQ6XEDUHDV
The Downtown Core includes civic offices and administrative functions, active and passive public recreational spaces, cultural and performing arts venues, commercial retail, food and beverage services, hotel uses, and residential uses as part of mixed-use developments. Principles of its design and function are intended to embody transparency, accessibility, sustainability, and adaptability.
2-6
CHAPTER TWO
PLANNING ELEMENTS AND 02 DEVELOPMENT STANDARDS
April 21, 2026
PUBLIC REVIEW DRAFT
D. THE LAKES (SUBAREAS A AND D)
The following sections provide detailed descriptions of Subareas A and D, including their existing conditions, intended land uses, and development objectives.
I. SUBAREA A:
PRIVATE COMMERCIAL/
RESIDENTIAL
Development in Subarea A is planned
to consist of an integrated mixed-use
commercial and residential complex
composed of various commercial uses,
including restaurants, retail, offices
and/or movie theatre, multi-family
residential development with amenities,
accessory uses and structures to serve
residents and their guests, which would
complement the performing arts and
other Downtown Core venues.
The commercial development should be designed as a complex of individual buildings connected by plazas and pedestrian walkways. Commercial uses should support the mixed-use vision for the area. The private development links physically with the park, and other adjacent uses, and should have strong visual and physically inviting connections to encourage safe and pleasant pedestrian flow.
The commercial buildings should emphasize high-quality design and the provision of site amenities. The residential development should likewise emphasize high-qualitydesign and the provision of site amenities and should be appropriately setback from the street frontage. The individual components of the development should be integrated into a unified complex, which will complement the development in the other subareas. Similar themes in architectural design and building materials should be used to visually tie together the entire project. Variation and complexity in building forms should be utilized to break down the building masses and promote visual interest. Pedestrian access must be emphasized, and an attempt should be made to segregate pedestrian and vehicular circulation.
SUBAREA
A
A
2-7
PLANNING ELEMENTS AND DEVELOPMENT STANDARDS
City of Thousand Oaks
CIVIC ARTS PLAZA SPECIFIC PLAN
The Lakes internal paseo.
The private development should include a large pedestrian oriented plaza to allow and encourage congregation and pedestrian circulation among the uses, and potential for outdoor events including such amenities as: benches; outdoor dining patio tables, chairs, umbrellas, patio covers, etc.; information and advertising kiosks; public telephones; drinking fountains; restrooms in the various commercial tenant spaces, which restrooms will be open to public use; bicycle parking; potted plants; decorative and pedestrian scaled lighting and landscape lighting; permanent electrical power outlet locations for special events; small informal performance areas; sculptures and other art work, water fountains; designated locations for small City outdoor displays; directional signs; clock tower; merchant kiosks and/or push cart merchant program on plaza; and adequate passenger car drop off areas for interior roads and driveways.
Vehicular access will be from Thousand Oaks Boulevard and Conejo School Road.
Parking is provided in a surface parking lot or parking structure located south of the commercial buildings and along the adjacent service road. 2-8
CHAPTER TWO
PLANNING ELEMENTS AND 02 DEVELOPMENT STANDARDS
April 21, 2026
PUBLIC REVIEW DRAFT
a. Subarea A Use Regulations
The uses which are specifically permitted in Subarea A are listed below. The Community Development Director shall determine whether any proposed use is permitted and/or consistent with this Specific Plan.
• Office supplies and stationary stores
• Offices, business
• Offices, professional, medical, dental,
excluding veterinary
• On-site sale and consumption of
alcoholic beverages in conjunction with
the operation of restaurants and cafes,
provided such is reviewed and approved
by the Community Development
Director
• Optical stores
• Other office or office related uses
as approved by the Community
Development Director
• Pharmacies
• Restaurants and cafes with outdoor
customer dining areas, including fast
food outlets
• Screened wireless communications
facilities
• Shoe stores
• Specialty gift, health and vitamin stores,
and grocery stores
• Sporting goods stores
• Surf shops
• Theatres, indoor
• Toy stores
• Travel agency
• Uses incidental and accessory
to permitted uses, such as live
entertainment in conjunction with the
operation of restaurants
• Vending carts, retail kiosks and food
pavilions
• Video stores
• Wearing apparel stores
• Bakeries
• Banks, including ATM, and similar
businesses
• Beauty salon, beauty supply, day spa
and barber shops
• Blueprinting, photostating, and
photofinishing facilities
• Bookstores
• Commercial uses associated with arts,
crafts, music, dance, and other artistic
and cultural activities (e.g., art galleries,
music and art shops, dance and music
studios, etc.)
• Computer and computer software
stores
• Day care centers
• Delicatessens
• Dry cleaners (customer service facility
only, without on-site processing)
• Florist shops
• Health and fitness clubs
• Home entertainment and electronics
stores
• Home furnishings, home décor, and
houseware stores
• Jewelry stores
• Live entertainment in the plaza
area provided such use is reviewed
and approved by the Community
Development Director
• Luggage stores
• Multi-family residential, including
amenities and accessory uses and
structures to serve residents and their
guests
• Multi-level parking structure
• Newsstands
SUBAREA
A
2-9
PLANNING ELEMENTS AND DEVELOPMENT STANDARDS
City of Thousand Oaks
CIVIC ARTS PLAZA SPECIFIC PLAN
b. Subarea A Development Standards
Since this Specific Plan is adopted by a duly enacted ordinance of the City, the following are the authorized development standards for Subarea A and supersede any zoning ordinances and standards to the contrary in effect for this area. All policies and regulations of the City of Thousand Oaks, which are not specifically superseded as described in this Specific Plan, remain in effect and shall be fully applicable to the area encompassed by this plan. Where the Specific Plan is silent on zoning standards and/ or regulations, the Community Development Director shall make a determination on which land-use standard(s) shall apply based on the most similar zoning or land use identified in the City’s Code or General Plan.
iii. Building Height
35-foot maximum for structures or portions of within 150 feet of the centerline of Thousand Oaks Boulevard and Conejo School Road, and 65-foot maximum for the remainder of the area. For areas with a 35-foot maximum building height, the maximum height shall be determined by measuring vertically from the corresponding grade elevations along the street frontages of Thousand Oaks Boulevard and Conejo School Road. For the areas with a 65-foot maximum building height, the maximum height shall be measured vertically from a point, that is the average elevation of each of the sides of the building.
Roof attachments such as flagpoles, architectural towers, parapets, wireless masts, mechanical equipment and similar diminutive roof attachments, and stairway and elevator towers shall not be included in the total building height calculation and may be erected above the height limits set forth above provided such roof attachments or any other device shall not exceed 20 feet above the prescribed height limit.
iv. Setbacks
A 35-foot landscaped setback shall be provided adjacent to both Thousand Oaks Boulevard and Conejo School Road.