ATTACHMENT #2
DPW: 850-20\ev\Council\2026\10272026\CI 5642\Water Mainline Replacement Project Att 2.docx
Project Name: Water Mainline Replacement
Project (CI 5642)
THIRD AMENDMENT TO
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN THE CITY OF THOUSAND OAKS
AND
MNS ENGINEERS, INC.
Contract No. 14134-2025
THIS THIRD AMENDMENT to the Agreement for Professional Services entered into between the CITY OF THOUSAND OAKS, a municipal corporation, (hereafter “City”) and MNS ENGINEERS, INC. (“Consultant”), entitled Water Mainline Replacement Project (CI 5642) and dated December 2, 2025 and amended on March 17, 2026, and July 6, 2026 (herein “Contract”) is made this 27th day of October 2026.
RECITALS
A. Section 3 of Contract, currently and as may have previously been amended, provides for a “not-to-exceed” total payment as consideration to Consultant of $274,740 for services generally and briefly described as Professional Design
Services for the Water Mainline Replacement Project.
B. Section 5 of the Agreement, and as may have been previously amended, provides for the term of this Agreement to be from December 2, 2025 to December 31, 2026.
C. An updated Levine Act form is necessary to comply with state law.
D. City is in need of expanding the Scope of Services to be performed under the present Contract and extending the term, and Consultant is desirous of performing such and receiving additional compensation for said additional services.
AGREEMENT TO AMEND
NOW, THEREFORE, the undersigned parties to Contract agree to amend Contract as described below:
DPW: 850-20\ev\Council\2026\10272026\CI 5642\Water Mainline Replacement Project Att 2.docx
Part 1. The following services to be performed by Consultant are added to the Scope of Services listed in Section 2 of Contract and such section is hereby amended to add and also include the following services, and Exhibit A-3, attached hereto and incorporated herein is hereby added to Contract:
Provide the additional Caltrans requested calculations, reports, and design revisions required to support the final design, permits, and construction of the 12” waterline relocation to the Avenida De Las Flores Bridge.
Part 2. The sum of $84,945 is added as compensation to Consultant under the present Contract for the above-described additional services, and Subsection 3 (a) of Contract is hereby amended to read in part as follows. (a) Maximum and Rate. The total compensation payable to Consultant by City for the services under this Agreement SHALL NOT EXCEED the sum of $359,685 (herein “not to exceed amount”), and shall be earned as the work progresses on the following basis:
Part 3. A period of one year is added to Contract and Section 5 of the Agreement is hereby amended to read in its entirety as follows:
The term of this Agreement is from the date first written above to December 31, 2027, unless term of this Agreement is extended or the Agreement is terminated as provided for herein
Part 4. An updated Levine Act Disclosure Form, attached hereto and incorporated herein as Exhibit C-3, is hereby added to Contract.
Part 5. All terms used in Part 1, 2, 3, and 4 above shall have the meanings ascribed thereto in Contract. Except as amended in Part 1, 2, 3, and 4 above, all other sections, terms, obligations, duties, clauses, and provisions of Contract shall remain the same.
DPW: 850-20\ev\Council\2026\10272026\CI 5642\Water Mainline Replacement Project Att 2.docx
IN WITNESS WHEREOF, the parties execute this Third Amendment to Contract as of the date set forth above.
MNS ENGINEERS, INC
_____
Nick Panofsky, PE, Vice President
Shawn Kowalewski, PE
Vice President
CITY OF THOUSAND OAKS
Mikey Taylor, Mayor
ATTEST:
Laura B. Maguire, City Clerk
APPROVED AS TO ADMINISTRATION:
Andrew P. Powers, City Manager
APPROVED BY DEPARTMENT HEAD:
Nader Heydari, PE, Public Works Director
APPROVED AS TO FORM:
Office of the City Attorney
Tracy Friedl, Assistant City Attorney
DPW: 850-20\ev\Council\2026\10272026\CI 5642\Water Mainline Replacement Project Att 2.docx
EXHIBIT A-3
Scope of Work
Water Mainline Replacement Project (CI 5642)
Consultant shall perform the following work:
TASK 3.3- Final Submittal
Task 3.3.4: Grate Flow Calculations
Consultant shall prepare grate flow calculations to demonstrate that the grate opening can handle a failure of the pipe.
Task 3.3.5: Deck and Soffit Load Rating Calculations
Consultant shall prepare finite element model to evaluate the existing and modified deck geometry associated load rating.
Task 3.3.6: Lateral Pipe Restraint Design
Consultant shall update pipe restraint design to include bearing-type steel assembly.
Task 3.3.7: Deflection Calculations
Consultant shall prepare Deflection Calculations to demonstrate the capacity of the flex-tend is exceeded for both longitudinal and transverse displacement demands.
Consultant shall prepare a movement rating calculation for longitudinal demands. Consultant shall prepare static analysis for seismic demands.
TASK 3.4- Permits
Task 3.4.3: Additional Traffic Control Plans on SR-23
Consultant shall prepare the Traffic Control Plan on SR-23 to support portions of the Avenida De Las Flores Bridge construction.