By: Luis E. Velazquez, Planning Associate | [email protected] Subject: Planning Commission and Community Development – Conduct Public Hearing and Adoption of RESOLUTIONS For Denial of an Appeal of the Planning Commission’s Approval of Conditional Use Permits (CUP24 -00012, CUP24-00013) to Allow the Construction of Two Industrial Buildings Totaling 276,300 Square Feet on a 14.02- Acre Site, in Conjunction with a Division of Lot (DIV24-00004) to Consolidate Three Existing Parcels into Two Parcels, and Adoption of Mitigated Negative Declaration (EAS24-00001) on Property Located in the Heavy Manufacturing District (M-2 Zone) at 2160 West 190th Street (APNs 7352 -016-001, 7352-016-002, and 7352 -016- 003); and Deny the Appeal , Adopt RESOLUTIONS, Upholding the Planning Commission’s Actions, and Affirming the Adoption of Mitigated Negative Declaration (EAS24-00001). Expenditure: None.
RECOMMENDATION
Recommendation of the Planning Commission and Community Development Director that City Council:
1. Conduct public hearing; and
2. Deny the appeal; and
3. Adopt RESOLUTIONS denying the appeal and upholding the Planning Commission's approval of CUP24-00012, CUP24-00013, and DIV24-00004, and affirming the adoption of a Mitigated Negative Declaration (EAS24 -00001), in accordance with Division 9, Chapter 5, Article 1 and Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC), to allow the construction of two industrial buildings totaling approximately 276,300 square feet on a 14.02-acre site and the consolidation of three existing parcels into two.
FUNDING
None required.
DISCUSSION
The project applicant, RREEF America, LLC, is requesting City Council consideration to allow the development of two industrial buildings totaling approximately 276,300 square feet on a 14.02- acre site. The proposal also includes a Division of Lot to consolidate three existing parcels into two parcels. The subject property is located in the M -2 Zone at 2160 West 190th Street. The project is referred to as the “Sequoia Commerce Center Project.” 1 City Council
August 19, 2025
In accordance with the California Environmental Quality Act (CEQA), an Environmental Assessment (EAS24-00001) was prepared for the project. Based on the analysis, a Mitigated Negative Declaration (MND) was adopted by the Planning Commission on May 7, 2025, determining that all potential environmental impacts could be mitigated to a less -than-significant level.
Analysis
As the development standards of the M-2 Zone are applicable to the project, discretionary review and approval of the entitlements below is required.
• CUP24-00012, CUP24-00013 to allow construction of a manufacturing, storage, or office building 15,000 square feet or greater in size; and
• DIV24-00004 to allow the consolidation of three parcels in two.
Background
On May 7, 2025, the Planning Commission held a public hearing to consider the proposed industrial project. During the hearing, the applicant presented an overview of the project, including its key components and intended operations. Following public testimony and deliberation , the Commission voted unanimously (7-0) to approve the project.
City Council Appeal
On May 15, 2025, an appeal was filed by the Supporters Alliance for Environmental Responsibility (SAFER), contesting the Planning Commission’s approval of CUP24-00012, CUP24 -00013, DIV24-00004, and EAS24-00001, which occurred on May 7, 2025.
The appeal challenges the City’s adoption of the IS/MND (Attachment 7) for the Sequoia Commerce Center project, asserting that the environmental review fails to adequately analyze potential adverse environmental impacts. SAFER contends that the IS/MND is insufficient under CEQA and requests that the City prepare a full Enviro nmental Impact Report (EIR). These concerns were outlined in SAFER’s comment letter submitted to the Planning Commission on May 7, 2025, prior to its decision. Staff notes that this letter was submitted the day of the meeting and was not included in the published agenda packet or supplemental materials . The letter was submitted as part of the appeal (Attachment 10).
SAFER’s appeal primarily challenges the City’s adoption of the Initial Study/Mitigated Negative Declaration (IS/MND), asserting that it fails to adequately evaluate air quality and hazardous materials impacts and therefore necessitates preparation of a ful l Environmental Impact Report (EIR). However, staff has thoroughly reviewed the appeal and the accompanying technical memorandum and concludes that the issues raised do not constitute substantial evidence of a potentially significant impact. The appeal pre sents generalized concerns and legal citations but does not identify new information or credible expert analysis demonstrating a fair argument that the project will result in a significant environmental effect. All potential impacts were appropriately studied, and mitigation measures have been identified and adopted to reduce those impacts to less-than-significant levels.
A detailed staff response to the appeal’s CEQA related claims is provided under Response to Appeal of Environmental Determination.
2 City Council
August 19, 2025
Response to the Appeal of Environmental Determination
In response to the CEQA-related appeal submitted by SAFER, staff offers the following detailed clarification and rebuttal. SAFER’s claims focus primarily on alleged deficiencies in the City’s air quality and hazardous materials analysis.
1. Air Quality Analysis
The appeal asserts that the IS/MND failed to adequately evaluate the air quality impacts of the project, particularly under a Warehousing Scenario with seven day-per-week operations. However, the IS/MND included a conservative and reasonable analysis based on a Manufacturing Scenario with robust operational assumptions. The five day workweek assumption aligns with standard CEQA modeling practices and reflects typical operational conditions at comparable industrial sites. The applicant has not proposed round the clock warehousing activity. The project proposal included construction of two shell warehouse buildings. If future tenants propose materially different operations that would alter the impact profile, they would be subject to additional discretionary review and CEQA compliance. Therefore, staff finds that the air quality analysis in the IS/MND is sufficient and that the appe al does not present substantial evidence of a potentially significant air quality impact.
2. Hazardous Materials Assessment
The appeal contends that the IS/MND did not adequately address potential contamination from the adjacent Torrance Refinery. However, the IS/MND relies on a Phase I Environmental Site Assessment (ESA) prepared by a qualified environmental professional, which includes a detailed review of historical site uses, surrounding industrial operations, and regulatory records. The ESA identified no recognized environmental conditions directly linked to the refinery. While the site’s industrial history was noted, any residual risks are addressed through Mitigation Measures (MM) HM-1 and HM-2, which are consistent with professional standards and City requirements. As such, staff finds that the environmental setting was appropriately characterized and the potential for hazardous materials impacts has been adequately assessed.
3. Adequacy of Mitigation Measures HM-1 and HM-2
The appeal argues that MM HM-1 and HM-2, as outlined in the Mitigation Monitoring and Reporting Program (MMRP) (Attachment 8) lack specificity and fail to meet CEQA’s standard for enforceable and effective mitigation. However, HM-1 requires the installation of an engineered vapor barrier beneath all new buildings, while HM -2 mandates implementation of a site specific Soil Management Plan during grading and excavation.
These measures are enforceable through the conditions of approval and the City’s permitting process. Although the appeal references supplemental guidance from the Department of Toxic Substances Control (DTSC), that guidance does not undermine the validity of the mitigation approach identified in the IS/MND. Additionally, the project site is not subject to active oversight by DTSC. Staff finds that the proposed mitigation program is appropriate, effective, and consistent with CEQA requirements.
In conclusion, staff finds that the IS/MND ion provides a thorough and defensible analysis of all potential environmental impacts. The appeal does not meet the evidentiary threshold necessary to warrant preparation of an EIR. Staff recommends that the City Council uphold the Planning Commission’s decision to adopt the MND and deny the appeal.
3 City Council
August 19, 2025
General Plan Land Use Designation
The project site has a General Plan land use designation of Business Park (I-BP), which allows a maximum FAR of 0.6. Development in the I-BP land use designation is characterized by a mixture of business, professional and medical office, research and development, and light industrial uses.
The proposed warehouse and office building is consistent with the Business Park land use designation.
Zoning Designation and Adjacent Land Uses
The project site is designated as M -2 Zone . The adjacent parcels to the south , west, and east share the same zoning designation and are developed as warehouses and a refinery. The adjacent parcels to the north are designated as Single-Family Residential District (R-1 Zone) developed with single-family residences. The zoning and surrounding land uses are shown in the Location and Zoning Map (Attachment 2).
NORTH: R-1 Single-Family Residences
SOUTH: M-2 Light Industrial Building
EAST: M-2 Professional Office Building
WEST: M-2 Oil Refinery
Project Site
The project site is parallel to 190th Street, rectangular in shape and relatively flat. The project site comprises three parcels totaling approximately 14.02 acres, currently developed with 12 buildings totaling 275,635 square feet, along with landscaped parking areas and drive aisles. Multiple tenants for various uses currently occupy the buildings including chemical manufacturer, surgical device manufacturer, compressor parts sales, specialty packing and logistics, pharmacy, flooring manufacturer, clothing designer, and general offices . There are no outstanding natural features on the site.
The Project site is located within an urbanized environment with nearby industrial, commercial, and residential uses. Surrounding land uses include residential uses to the north across West 190th Street, commercial buildings to the south across 195th Street, commercial building to the east, and the Torrance Refinery to the west across Van Ness Avenue.
Division of Lot
The project involves DIV24-00004 to allow the consolidation of three parcels into two. Staff reviewed the map and found its design and improvements are consistent with the General Plan and in compliance with the Subdivision Map Ordinance of the TMC as well as the Subdivision Map Act of the State of California.
Site Design and Building Architecture
Building 1 would be located in the northern portion of the project site, while Building 2 would be situated in the southern portion. The proposed project complies with the design guidelines of the M-2 Zone, which emphasize appropriate scale, placement, and architectural compatibility with the surrounding area. The project enhances the existing industrial character by introducing a tilt -up warehouse that integrates seamlessly with the adjacent industrial buildings to the east and south.
The building incorporates modern industrial design elements consistent with recent architectural trends within the City and the region.
The site layout is designed to ensure a seamless transition in scale and functionality. The loading docks for both buildings are strategically positioned along the east elevations, minimizing visibility from the public right -of-way. Each building is centra lly located on its respective parcel, allowing 4 City Council
August 19, 2025
for generous setbacks from all property lines. Notably, a 92 -foot setback along 190th Street provides a substantial buffer from the public realm, enhancing the project's compatibility with its surroundings.
The architectural design features articulated building masses, varied elevations, and modulated rooflines to enhance visual interest. The building's exterior will feature tilt -up concrete panels, painted and scored to create wall plane variation and add vi sual appeal. The primary field color of the building will be Sherwin -Williams Origami White, complemented by a light accent color of Essential Gray. The ribbed concrete panels will incorporate accent colors of Downing Slate, with darker accent areas utilizing Iron Ore, creating a dynamic contrast while maintaining an industrial aesthetic. The building’s canopies will be finished with clear anodized Alucobond, while the glazing will feature PPG SolarCool Pacifica clear anodized storefront. These elements, to gether with the varied color palette, help create a visually appealing and modern industrial design that blends with the surrounding area.
Additionally, the project includes a comprehensive landscaping plan, with plantings along the building façade and throughout the parking lot. The largest landscape buffer will be located along Van Ness Avenue and 190th Street, contributing to a softened pedestrian scale and reducing the visual impact of the proposed development.
Building Use and Development Standards
The project consists of two industrial buildings, with Building 1 located in the northern portion of the site and Building 2 in the southern portion. Both buildings are designed to accommodate either warehousing or manufacturing uses, consistent with the p ermitted uses in the M -2 Zone. While the site plan allocates specific square footage to warehousing and manufacturing, the final mix of uses may vary based on tenant needs.
Under a warehousing use, Building 1 will provide 120,466 square feet of warehouse space, including 15,000 square feet of ancillary office space, while Building 2 will feature 155,834 square feet of warehouse space with 15,000 square feet of office space. If a tenant were to incorporate manufacturing, a potential configuration could allocate 69,000 square feet of Building 1 for manufacturing, with the remaining 36,466 square feet used for warehousing and 15,000 square feet for office space. Similarly, Build ing 2 could include 95,000 square feet of manufacturing space, 45,834 square feet of warehousing, and 15,000 square feet of office space. However, the actual distribution of uses will be determined by future tenants.
The office components are strategically positioned at the corners of each building to optimize functionality and accessibility. Building 1 is designed with 16 dock doors along its east elevation, while Building 2 will have 28 dock doors on its east -facing side. The buildings are designed to ensure all business operations occur within enclosed spaces, except for traff ic movement, parking, and loading/unloading activities at designated bays and trailer parking stalls. Per contemporary industry standards, non-diesel-powered equipment such as yard trucks, hostlers, pallet jacks, and forklifts will be used for cargo handling.
The project features building heights that are consistent with the M-2 development standards and that demonstrate transition and scale to maintain conformity with the neighboring structures. The project proposes a maximum building height of 45’ to the topmost portion of the roof with portions dropping to 43’ and 41’ to enhance articulation. Staff notes the M -2 Zone does not identify a maximum building height and instead refers to the Building Code of the City of Torrance.
5 City Council
August 19, 2025
The project features building setbacks that are consistent with the M -2 development standards and complimentary to the neighboring industrial buildings. The building setbacks have been designed to achieve clear and recognizable transitions by providing wi de landscape setbacks along 190th Street and Van Ness Avenue that offer broad separation from the public right of way.
The project features landscaping that is consistent with the development standards of the TMC and that make a positive contribution to the aesthetics and function of the site. The TMC requires no less than five percent of a parking lot comprising more than 20 parking spaces to be landscaped. The proposed project provides a total of 13.43% of parking lot landscaping, totaling 82,000 square feet, well beyond the minimum required. The project incorporates landscape setbacks along the site perimeter that provid e an attractive view from the street and a softened human scale for pedestrians. Landscaping is distributed around the base of proposed building and alongside the public right of way as well as the parking areas. Staff notes that the preliminary landscaping plans indicate new trees are proposed along the eastern property line. During a site visit, staff observed existing trees located within the adjacent parcel to the east that may interfere with the placement or growth of the proposed trees. To address this potential conflict, a condition has been added requiring tree diamonds along the eastern parking stalls to ensure proper tree spacing and health.
Parking
The project provides on -site parking for two industrial buildings, with capacity designed to accommodate industrial uses. Parking requirements are calculated based on a range of potential tenant uses, including office, warehouse, and manufacturing space. The site is divided into two parcels, each containing one of the proposed buildings.
Under the warehouse scenario, Building 1 requires 130 spaces and Building 2 requires 257 spaces, for a total of 387 required spaces. In this scenario, both proposed buildings meet or exceed their respective parking requirements. Under the manufacturing sce nario, Building 1 requires 257 parking spaces and provides 256, resulting in a shortfall of one space. Building 2 requires 328 spaces and provides 329, resulting in a surplus of one space. While Building 1 reflects a minor deficiency, the overall project w ould meet the parking requirement with no net shortfall.
Conclusion
In the judgment of staff, the project remains consistent with the development standards of the M- 2 Zone and the I -BP land use designation, which allows for traditional industrial uses such as manufacturing, warehousing, and distribution. The proposed buildings are similar in scale to others in the area and reflect the industrial character of the surrounding neighborhood.
The project design incorporates contemporary architectural features, including modulation of building massing and articulated façades, that enhance visual interest and are consistent with current regional industrial design trends. The proposed building height is compatible with existing nearby structures and represents a physical and aesthetic improvement to the site.
Environmental impacts associated with the project were thoroughly evaluated through an IS/MND, which concluded that, with implementation of the identified mitigation measures, no significant impacts would result. The Planning Commission adopted the MND (EAS24 -00001) on May 7, 2025.
Furthermore, the project supports business and employment growth within the City and aligns with General Plan goals to promote viable industrial development and employment -generating uses.
6 City Council
August 19, 2025
For these reasons, staff recommends that the City Council deny the appeal, affirm the Planning Commission’s adoption of the MND, and uphold the project approvals subject to conditions.
ENVIRONMENTAL FINDINGS
Environmental Assessment
As the final decision -making body for the Sequoia Commerce Center project, the City Council also assumes the role of Lead Agency under CEQA. In this capacity, the Council is responsible for evaluating the adequacy of the MND adopted by the Planning Commission and determining whether it remains the appropriate environmental document for the project. As part of this review, the Council must consider the entire administrative record, including technical reports, comment letters, and the appeal, to determine whether substantial evidence exists that the project may result in a significant environmental impact. If no such evidence is present and mitigation measures have been incorporated to reduce all potential impacts to less than significant levels, adoption of the MND remains appropriate under CEQA.
In accordance with the CEQA, the potential environmental impacts associated with the project were assessed in an IS/MND that was prepared by T&B Planning, Inc. for the City of Torrance, as the Lead Agency (Attachment 7).
The IS/MND, through its various technical studies (i.e., air quality, noise, sewer, traffic), substantiates that the potential environmental impacts associated with the implementation and operation the project would be reduced to less than significant with the incorporation of MMs that are monitored and enforced by a MMRP (Attachment 8).
The IS/MND found that construction and operation of the project would result in either no impact or less than significant impact in the following topics of environmental analysis:
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Energy, Greenhouse Gas Emissions, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Utilities and Services Systems, and Wildfire.
The IS/MND found that implementation and operation of the project would result in less than significant impacts with the incorporation of mitigation measures in the following topics of environmental analysis:
Cultural Resources, Geology and Soils, Hazards & Hazardous Materials, and Tribal Cultural Resources.
A copy of the IS/MND and all project documents incorporated by reference were circulated for public review and comment during a 30-day period that began on March 6, 2025 and ended April 7, 2025, and were made readily available at the City of Torrance Permi t Center, as well as the State Clearinghouse webpage and the City webpage (https://bit.ly/SequoiaCommerceCenter).
The IS/MND and all project documents were made available for public review during a 30 -day comment period from March 6, 2025, to April 7, 2025, through the City’s Permit Center, its website (https://bit.ly/SequoiaCommerceCenter), and the State Clearinghouse. Public notice was provided via a Notice of Intent (NOI) filed with the State Clearinghouse and the Los Angeles County Registrar -Recorder/County Clerk, published in the Daily Breeze , mailed to property owners within 500 feet of the project site, and posted at the project site and at City Hall (Attachment 3).
7 City Council
August 19, 2025
A total of three comment letters were received during the review period, two from public agencies and one from a member of the public. Although CEQA does not require formal responses to comments on a draft MND, staff prepared a “Response to Comments” (Attachment 9) to provide additional information to the decision -making body. No new substantial issues were identified, and the comments did not raise significant environmental concerns not already addressed in the IS/MND.
Based on the full record, staff concludes that all environmental impacts have been adequately assessed, and with mitigation, the project would not result in significant effects on the environment. Recirculation of the MND is not required.
Environmental Determination
In the judgment of staff, the IS/MND and the accompanying Response to Comments adequately address all environmental issues raised during the review period and in the appeal. No new substantial evidence has been presented that would invalidate the findings of the MND. All potential impacts can be mitigated to a less-than-significant level and will be enforced through the MMRP.
Therefore, staff recommends that the City Council adopt the MND and affirm that it remains the appropriate environmental document for the project under CEQA.
ATTACHMENTS
1. Resolutions for Approval
2. Location and Zoning Map
3. Proofs of Publications and Notification
4. Planning Commission Staff Report (May 7, 2025)
5. Planning Commission Resolutions No. 25-033, 25-034, 25-035, 25-036
6. May 7, 2025 Meeting Minutes
7. Initial Study/Mitigated Negative Declaration (Available online at https://bit.ly/SequoiaCommerceCenter)
8. Mitigation Monitoring and Reporting Program (Available online at https://bit.ly/SequoiaCommerceCenter)
9. Response to Comments (Available online at
https://bit.ly/SequoiaCommerceCenter)
10. Appeal Filing and Comment Letter – SAFER
11. Project Plans
8 RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF
A CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
120,466 SQUARE FOOT INDUSTRIAL WAREHOUSE
BUILDING ON PROPERTY LOCATED IN THE HEAVY
MANUFACTURING ZONE AT 2160 W. 190TH STREET.
CUP24-00012: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA), and for approval of a Conditional Use Permit (CUP24-00012) to allow the construction of a 120,466 square foot industrial warehouse building, in conjunction with a Division of Lot (DIV24-00004) to consolidate three existing parcels into two parcels, on property located in the Heavy Manufacturing (M-2) Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the Sequoia Commerce Center Project; and WHEREAS, at the Planning Commission meeting of May 7, 2025, a motion to approve the project passed by a roll call vote of 7 to 0; and
WHEREAS, an appeal to the City Council was filed on May 15, 2025; and WHEREAS, the City Council of the City of Torrance conducted a public hearing on August 19, 2025, to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a MND in accordance with CEQA, and for approval of a CUP24-00012 to allow the construction of a 120,466 square foot industrial warehouse building, in conjunction with a DIV24-00004 to consolidate three existing parcels into two parcels; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 and Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC); and
WHEREAS, the City Council of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001, 7352-016- 002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described “*TR=PART OF THE RANCHO SAN PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT” as per map recorded in the Office of the Los Angeles County Recorder, State of California; 9 ATTACHMENT 1
c) That the subject parcel (APN 7352-016-002) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 1” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 2” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration (IS/MND) in accordance with the CEQA. The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore an MND was adopted;
f) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the Torrance Municipal Code and is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance; g) That the project, as conditioned, will not impair the integrity and character of the M-2 Zone because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the south and east, and the petroleum refinery to the west;
h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration;
i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west; j) That the project, as conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the I-BP land use designation, which is characterized by manufacturing industries which process raw or extracted substances, or which use hazardous materials. Permitted uses include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products;
k) That the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal through modulation of building masses, elevations, and rooflines that promote visual interest;
l) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by all necessary utilities and public services. In addition, the project applicant is required to pay development impact fees to offset the incremental increase in the demand for public services;
10 m)That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded by three streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minimum requirement for onsite parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n) That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has been thoroughly reviewed and found to be in compliance with the objective development standards of the M-2 Zone and is consistent with the I-BP land use designation; o) That the project, as conditioned, will not produce any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
NOW, THEREFORE, BE IT RESOLVED that CUP24-00012 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) to allow the construction of a 120,466 square foot industrial warehouse building on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP24-00012; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
2. That if CUP24-00012 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval. The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of this Conditional Use Permit or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award;
4. That a copy of City Council Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid 11 documents associated with the project to facilitate coordination and effective implementation of the conditions of approval and the mitigation measures; (Planning)
5. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
6. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
7. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas; (Planning)
8. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
9. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
10. That no truck terminal, truck stop, or similar operation shall be permitted on-site; (Planning)
11. That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
12. That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
13. That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
14. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
15. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
16. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
17. That all windows/glazing below an elevation of 10 feet shall be provided with a protective film or other technology to prevent graffiti. In addition, protective film or equivalent anti-graffiti measures shall be applied to all corner office entryways; (Planning)
18. That any future request for a Wireless Antenna Facility shall require separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
19. That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the CEQA, and such use is reviewed and approved by the Community Development Department; (Planning) 12 20. That the total floor area devoted to manufacturing shall not exceed 69,000 square feet. Any future expansion of floor area beyond this limit shall require prior review and approval by the Community Development Department to assess compliance with parking requirements; (Planning)
21. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
22. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integral part of the facade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
23. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street. The applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
24. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project site perimeter prior to the issuance of grading permits to the satisfaction of the Community Development Director; (Planning)
25. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved by the Community Development Director. The perimeter fencing and decorative wrap shall be installed prior to the issuance of grading permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
26. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGC) and shall ensure that all parking areas and pathways are provided with adequate illumination, security lights that are non-glaring, and that all building lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line shall not exceed 1 foot candle. Light fixtures in the uncovered parking area shall not exceed 15 feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
27. That a roof plan shall be included with the building plan set for review prior to permit issuance.
The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such a manner that noise emanating from the roof appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
28. That a site plan shall be submitted with the building plan set for review prior to permit issuance.
The site plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel, meter, backflow preventer, 13 double detector check assembly, fire riser, etc. Screening shall comply with all utility company and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
29. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Van Ness Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the latest State Water Efficient Landscape Ordinance; (Planning)
30. That all trees planted within the project site shall not be less than 24-inch box in size, and that all shrubs not be less than 1 gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; (Planning)
31. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satisfaction of the Community Development Director; (Planning)
32. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at intervals of one tree for every four spaces along the eastern row of parking stalls, consistent with minimum tree spacing requirements. The placement and spacing of tree diamonds shall be designed to avoid conflicts with existing trees located on the adjacent eastern parcel, to the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
33. That the applicant shall demonstrate compliance with the City’s Transportation Demand Management (TDM) Ordinance on the submitted plans at the time of Building and Safety plan check review; (Transportation Planning)
34. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits. The plan shall include, but not be limited to, stop controls, pedestrian and vehicular signage, striping, wayfinding elements, and clearly delineated pedestrian pathways throughout the site.
Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop signs, yield signs, and directional signage, as no such features are currently depicted on the submitted plans. The applicant shall also consider the implementation of right-turn-only movements at the eastern driveway along 190th Street and at the driveways along Van Ness Avenue, given the proximity of the signalized intersection at 195th Street; (Transportation Planning)
35. That the project shall comply with current Green Code’s Tier 1 Requirements; (Building and Safety)
14 36. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction of the Building Official; (Building and Safety)
37. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed buildings; (Environmental)
38. That the applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division; (Environmental/Transportation Planning)
39. That the applicant shall install rooftop numbers in order to assist law enforcement and other emergency personnel locate the property. The numbers should be four feet high and two feet wide, spaced one foot apart, be parallel to the street and be a non-reflective color that contrasts the color of the roof; (Environmental/Police)
40. That the applicant shall verify whether a Master Sign Program is on file for the property. If no such program exists, the applicant shall prepare and submit a new Master Sign Program in compliance with TMC 911.5.020, including a 1–2-page summary outlining the proposed signage standards and guidelines; (Environmental)
41. That the applicant shall ensure that all signage—including new, modified, or revised signs— is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file; (Environmental)
42. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current National Pollutant Discharge Elimination System (NPDES) requirements and shall be submitted as part of the building plan check submittal; (Environmental/Planning)
43. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
44. That all connections for water service shall be made to the stub outs provided (unless stub outs are undersized). If existing stub outs are not used, they shall be abandoned at the main; (Water)
45. That all proposed and/or existing water meters larger than two inch, double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right-of-way and shall be screened from public view with approved plant material. Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT ISSUANCE. Landscape screening shall provide access to water and fire department at all times and be maintained diligently to the satisfaction of the Fire Marshal; (Water)
46. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (Water)
47. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310-660-6208 for assistance developing plans and coordinating with California Department of Health Services; (Water)
48. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes. The back of walk shall line up with the property line along Van Ness Avenue and 195th Street. See City of Torrance standard T114; (Engineering)
15 49. That the applicant/developer shall design and construct a private storm drain system to public standards. The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Private storm drain to be constructed prior to occupancy; (Engineering)
50. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
51. That a hydrology study shall be submitted to and approved by the Community Development Department, Engineering Division prior to approval of the grading plan. The study shall include method of detaining the difference between the 10-year and 50-year storm. Determine proposed building finished floor elevation with adequate freeboard; (Engineering)
52. That separate sewer laterals shall be provided for each building to the public sewer mainline.
The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the building permit. The existing sewer lateral shall be replaced if damage is found; (Engineering)
53. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
54. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
55. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on-site fire hydrants are installed; (Engineering)
56. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
57. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3-port fire hydrants with break-off check valves; (Engineering)
58. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
59. The applicant shall install non-glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
60. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
61. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans. The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standards to allow selective or universal access to live camera feeds by law enforcement in the event of an active crime or emergency situation; (Police)
62. The applicant shall remove and replace all existing Ficus trees located within the parkway.
Street trees shall be planted in every existing vacant tree well within the parkway. All vegetation within the parkway shall not exceed 18 inches in height and shall be free of thorns; and (Streetscape)
16 63. That all conditions of all other City departments received prior to or during the consideration of this case by the City Council shall be met.
INTRODUCED, APPROVED and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of August 2025.
_______________________________
Mayor George K. Chen
APPROVED AS TO FORM:
Patrick Q. Sullivan, City Attorney ATTEST:
________________________________ _______________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk 17 RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF
A CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
155,834 SQUARE FOOT INDUSTRIAL WAREHOUSE
BUILDING ON PROPERTY LOCATED IN THE HEAVY
MANUFACTURING ZONE AT 2160 W. 190TH STREET.
CUP24-00013: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA), and for approval of a Conditional Use Permit (CUP24-00013) to allow the construction of a 155,834 square foot industrial warehouse building in conjunction with a Division of Lot (DIV24-00004) to consolidate three existing parcels into two parcels on property located in the Heavy Manufacturing (M-2) Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the Sequoia Commerce Center Project; and WHEREAS, at its meeting on May 7, 2025, the Planning Commission adopted a motion to approve the project by a roll call vote of 7 to 0; and
WHEREAS, an appeal to the City Council was filed on May 15, 2025; and WHEREAS, the City Council of the City of Torrance conducted a public hearing on August 19, 2025, to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the CEQA, and for approval of a CUP24-00013 to allow the construction of a 155,834 square foot industrial warehouse building in conjunction with a DIV24-00004 to consolidate three existing parcels into two parcels; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 and Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC); and
WHEREAS, the City Council of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001, 7352-016- 002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described “*TR=PART OF THE RANCHO SAN PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG 18 POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT” as per map recorded in the Office of the Los Angeles County Recorder, State of California; c) That the subject parcel (APN 7352-016-002) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 1” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 2” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration (IS/MND) in accordance with the CEQA. The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore an MND was adopted;
f) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the Torrance Municipal Code and is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance; g) That the project, as conditioned, will not impair the integrity and character of the M-2 Zone because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the south and east, and the petroleum refinery to the west;
h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration;
i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west; j) That the project, as conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the I-BP land use designation, which is characterized by manufacturing industries which process raw or extracted substances, or which use hazardous materials. Permitted uses include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products;
k) That the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal through modulation of building masses, elevations, and rooflines that promote visual interest;
l) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by all necessary utilities and public services. In addition, the project applicant is required to 19 pay development impact fees to offset the incremental increase in the demand for public services;
m)That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded by three streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minimum requirement for onsite parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n) That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has been thoroughly reviewed and found to be in compliance with the objective development standards of the M-2 Zone and is consistent with the I-BP land use designation; o) That the project, as conditioned, will not produce any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
NOW, THEREFORE, BE IT RESOLVED that CUP24-00013 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) to allow the construction of a 155,834 square foot industrial warehouse building on property located in the M-2 Zone at 2160 West 190 th Street, referred to as the Sequoia Commerce Center Project, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP24- 00013; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
2. That if CUP24-00013 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval. The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of this Conditional Use Permit or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; 20 4. That a copy of City Council Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation of the conditions of approval and the mitigation measures; (Planning)
5. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
6. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
7. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas; (Planning)
8. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
9. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
10. That no truck terminal, truck stop, or similar operation shall be permitted on-site; (Planning)
11. That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
12. That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
13. That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
14. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
15. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
16. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
17. That all windows/glazing below an elevation of 10 feet shall be provided with a protective film or other technology to prevent graffiti. In addition, protective film or equivalent anti- graffiti measures shall be applied to all corner office entryways; (Planning)
18. That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
19. That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the CEQA, and such use is reviewed and approved by the Community Development Department; (Planning)
20. That the total floor area devoted to manufacturing shall not exceed 95,000 square feet.
Any future expansion of floor area beyond this limit shall require prior review and approval 21 by the Community Development Department to assess compliance with parking requirements; (Planning)
21. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
22. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integral part of the facade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
23. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street.
The applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
24. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project site perimeter prior to the issuance of grading permits to the satisfaction of the Community Development Director; (Planning)
25. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved by the Community Development Director. The perimeter fencing and decorative wrap shall be installed prior to the issuance of grading permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
26. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGC) and shall ensure that all parking areas and pathways are provided with adequate illumination, security lights that are non-glaring, and that all building lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line shall not exceed 1 foot candle.
Light fixtures in the uncovered parking area shall not exceed 15 feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
27. That a roof plan shall be included with the building plan set for review prior to permit issuance. The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such a manner that noise emanating from the roof appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
28. That a site plan shall be submitted with the building plan set for review prior to permit issuance. The site plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel, meter, backflow preventer, double detector check assembly, fire riser, etc. Screening shall comply with all 22 utility company and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
29. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade-producing trees, and shall provide state-of- the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Van Ness Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the latest State Water Efficient Landscape Ordinance; (Planning)
30. That all trees planted within the project site shall not be less than 24-inch box in size, and that all shrubs not be less than 1 gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; (Planning)
31. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satisfaction of the Community Development Director; (Planning)
32. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at intervals of one tree for every four spaces along the eastern row of parking stalls, consistent with minimum tree spacing requirements. The placement and spacing of tree diamonds shall be designed to avoid conflicts with existing trees located on the adjacent eastern parcel, to the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
33. That the applicant shall demonstrate compliance with the City’s Transportation Demand Management (TDM) Ordinance on the submitted plans at the time of Building and Safety plan check review; (Transportation Planning)
34. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits. The plan shall include, but not be limited to, stop controls, pedestrian and vehicular signage, striping, wayfinding elements, and clearly delineated pedestrian pathways throughout the site. Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop signs, yield signs, and directional signage, as no such features are currently depicted on the submitted plans.
The applicant shall also consider the implementation of right-turn-only movements at the eastern driveway along 190th Street and at the driveways along Van Ness Avenue, given the proximity of the signalized intersection at 195th Street; (Transportation Planning)
35. That the project shall comply with current Green Code’s Tier 1 Requirements; (Building and Safety)
36. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction of the Building Official; (Building and Safety)
23 37. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed buildings; (Environmental)
38. That the applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division; (Environmental/Transportation Planning)
39. That the applicant shall install rooftop numbers in order to assist law enforcement and other emergency personnel locate the property. The numbers should be four feet high and two feet wide, spaced one foot apart, be parallel to the street and be a non-reflective color that contrasts the color of the roof; (Environmental/Police)
40. That the applicant shall verify whether a Master Sign Program is on file for the property.
If no such program exists, the applicant shall prepare and submit a new Master Sign Program, including a 1–2-page summary outlining the proposed signage standards and guidelines; (Environmental)
41. That the applicant shall ensure that all signage—including new, modified, or revised signs—is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file; (Environmental)
42. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current National Pollutant Discharge Elimination System (NPDES) requirements and shall be submitted as part of the building plan check submittal; (Environmental/Planning)
43. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
44. That all connections for water service shall be made to the stub outs provided (unless stub outs are undersized). If existing stub outs are not used, they shall be abandoned at the main; (Water)
45. That all proposed and/or existing water meters larger than two inch, double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right-of-way and shall be screened from public view with approved plant material. Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT ISSUANCE. Landscape screening shall provide access to water and fire department at all times and be maintained diligently to the satisfaction of the Fire Marshal; (Water)
46. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (Water)
47. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310-660-6208 for assistance developing plans and coordinating with California Department of Health Services; (Water)
48. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes. The back of walk shall line up with the property line along Van Ness Avenue and 195th Street. See City of Torrance standard T114; (Engineering)
49. That the applicant/developer shall design and construct a private storm drain system to public standards. The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit.
Private storm drain to be constructed prior to occupancy; (Engineering) 24 50. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
51. That a hydrology study shall be submitted to and approved by the Community Development Department, Engineering Division prior to approval of the grading plan. The study shall include method of detaining the difference between the 10-year and 50-year storm. Determine proposed building finished floor elevation with adequate freeboard; (Engineering)
52. That separate sewer laterals shall be provided for each building to the public sewer mainline. The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the building permit. The existing sewer lateral shall be replaced if damage is found; (Engineering)
53. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
54. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
55. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on-site fire hydrants are installed; (Engineering)
56. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
57. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3-port fire hydrants with break- off check valves; (Engineering)
58. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
59. The applicant shall install non-glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
60. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
61. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans. The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standards to allow selective or universal access to live camera feeds by law enforcement in the event of an active crime or emergency situation; (Police)
62. The applicant shall remove and replace all existing Ficus trees located within the parkway.
Street trees shall be planted in every existing vacant tree well within the parkway. All vegetation within the parkway shall not exceed 18 inches in height and shall be free of thorns; and (Streetscape)
63. That all conditions of all other City departments received prior to or during the consideration of this case by the City Council shall be met.
INTRODUCED, APPROVED and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of August 2025.
_______________________________
25 Mayor George K. Chen
APPROVED AS TO FORM:
Patrick Q. Sullivan, City Attorney ATTEST:
________________________________ _______________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk 26 RESOLUTION NO. 2025-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF
A DIVISION OF LOT AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE FOR LOT CONSOLIDATION PURPOSES ON
PROPERTY LOCATED IN THE HEAVY MANUFACTURING
ZONE AT 2160 W. 190TH STREET.
DIV24-00004: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for approval of a Division of Lot (DIV24-00004) to consolidate three existing parcels into two parcels on property located in the Heavy Manufacturing (M-2) Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, at its meeting on May 7, 2025, the Planning Commission adopted a motion to approve the project by a roll call vote of 7 to 0; and
WHEREAS, an appeal to the City Council was filed on May 15, 2025; and WHEREAS, the City Council of the City of Torrance conducted a duly noticed public hearing on August 19, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for approval of a DIV24-00004 consolidate three existing parcels into two parcels; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 and Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC); and
WHEREAS, the City Council of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001, 7352-016- 002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described “*TR=PART OF THE RANCHO SAN PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT” as per map recorded in the Office of the Los Angeles County Recorder, State of California; c) That the subject parcel (APN 7352-016-002) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 1” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as “*TR=PARCEL MAP AS PER BK 67 PG 3 OF P M LOT 2” as per map recorded in the Office of the Los Angeles County Recorder, State of California;
27 e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration in accordance with the California Environmental Quality Act (CEQA). The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore a Mitigated Negative Declaration was adopted; f) That the proposed Division of Lot, together with provision for its design and improvement, is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance;
g) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the TMC and is consistent with the I-BP land use designation of the General Plan of the City of Torrance; h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration;
i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west; j) That the subdivision for consolidation purposes will not interfere with the orderly development of the City and will incorporate a high quality design; k) That the design of the development and subdivision will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat as potential environmental impacts have been analyzed in accordance with the CEQA.
An Initial Study (IS) was prepared, and it was determined that the project, with incorporation of mitigation measures, will not have a significant effect on the environment. A Mitigated Negative Declaration (MND) has been prepared and circulated in accordance with CEQA Guidelines;
l) That the project, as conditioned, will not produced any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
m) That the design of the development and subdivision will not conflict with any public access or easements as all means of public access are being improved along 190th Street, Van Ness Avenue and 195th Street.
NOW, THEREFORE, BE IT RESOLVED that DIV24-00004 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) to allow a consolidation of three existing parcels into two parcels on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project , on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
28 1. That use of the subject property shall be subject to all conditions imposed in DIV24-00004; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DIV 24-00004 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That a copy of Planning Commission Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation of the conditions of approval and the mitigation measures; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department; and (Engineering)
5. That all conditions of all other City departments received prior to or during the consideration of the project by the City Council shall be met.
INTRODUCED, APPROVED and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of August 2025.
_______________________________
Mayor George K. Chen
APPROVED AS TO FORM:
Patrick Q. Sullivan, City Attorney ATTEST:
________________________________ _______________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk 29 RESOLUTION NO. 25-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION OF ADOPTING
A MITIGATED NEGATIVE DECLARATION FOR THE
SEQUOIA COMMERCE CENTER PROJECT IN
ACCORDANCE WITH THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT.
EAS24-00001: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA) on property located in the Heavy Manufacturing ( M-2) Zone at 2160 West 190 th Street, referred to as the Sequoia Commerce Center Project; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 and Division 9, Chapter 2, Article 29 of the Torrance Municipal Code; and
WHEREAS, pursuant to the CEQA, (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.), as amended, the City of Torrance is the Lead Agency responsible for preparation and consideration of the environmental review for the Seqouia Commerce Project; and WHEREAS, an Initial Study (IS) was prepared to assess the potential environmental impacts associated with the Seqouia Commerce Project, and said IS concluded that the project may result in or cause potentially significant effects. However, compliance with existing policies, plans and regulations, revisions to the plans, together with design features and mitigation measures incorporated would avoid t he effects or mitigate the effects to levels that would be less than significant. Therefore, the City of Tor rance has determined a MND is appropriate and that no further environmental review is required; and
WHEREAS, notices of the Initial Study/Mitigated Negative Declaration (IS/MND) and its availability for review and comment were filed and circulated for a thirty (30) calendar day period commencing on March 6, 2025, and ending on April 7, 2025; and WHEREAS, during the review and comment period, affected public agencies and any interested parties were able to comment on the adequacy of the IS/MND in identifying and analyzing the potential environmental impacts associated with the Seqouia Commerce Project and the ways in which potentially significant effects can be avoided or mitigated; and WHEREAS, comment letters were received from private parties and public agencies related to the IS/MND prepared for the Seqouia Commerce Project, and have been thoroughly reviewed to determine whether any new substantial environmental issues have been raised; and WHEREAS, although CEQA does not require a formal response to each of the comments received on the IS/MND, a Response to Comments has nonetheless been prepared in order to 30 provide the decision-making body with additional information upon which to base their decision; and
WHEREAS, based on the evaluation in the IS/MND together with all comments received, no new substantial environmental issues have been raised and that all issued raised in the comment letters have been adequately addressed in the IS/MND and in the Response to Comm ents. All potential impacts associated with the Seqouia Commerce Project were found to be less than significant with incorporation of relevant mitigation measures, where applicable . Therefore, the findings and conclusions of the IS/MND are not aff ected, and no revisions are required or proposed; and
WHEREAS, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared that list all of the Mitigation Measures (MMs), specifies the appropriate responsible party for implementing each mitigation measure, and identifies approximate time frames for implementing of each mitigation measure; and
WHEREAS, the IS/MND and MMRP and all documents and records relating to the Seqouia Commerce Project are on file and available for review with the Community Development Department of the City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA 90503; and
WHEREAS, at Planning Commission meeting of May 7, 2025, a motion to approve the project passed by a roll call vote of 7 to 0; and
WHEREAS, an appeal to the City Council was filed on May 15, 2025; and WHEREAS, the City Council of the City of Torrance conducted a duly noticed public hearing on August 19, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of an MND in accordance with CEQA on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, the City Council considered all written and oral evidence, including the basis of the appeal, and finds that the appeal did not present substantial evidence of new or more severe environmental impacts, and no changes to the MND are required; and WHEREAS, the City Council of the City of Torrance does hereby find and determine as follows:
a) That the IS/MND was properly prepared and circulated for public review in accordance with the CEQA;
b) That the IS/MND was carefully considered and all comments thereon, and is the appropriate environmental document for the project, and reflects the independent judgment and analysis of the City of Torrance as the Lead Agency, and that no further environmental review is required;
c) That with implementation of the mitigation measures identified in the IS/MND and included in and enforced by the MMRP, and on the basis of the whole record and public testimony considered, there is no substantial evidence that the project will have a significant effect on the environment;
d) That the MND is hereby adopted; and
31 e) That the IS/MND and MMRP and the documents and records relating to the project are on file with the Community Development Department of the City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA 90503.
INTRODUCED, APPROVED and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of August 2025.
_______________________________
Mayor George K. Chen
APPROVED AS TO FORM:
Patrick Q. Sullivan, City Attorney ATTEST:
________________________________ _______________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk 32 F
190TH
VAN NESS
GRAMERCY
TOYOTA
HAAS
W
ILTON
PRIVATE DRIVEW
AY
PRIVATE STREET
PRIVATE DRIVEW
AY
PRIVATE DRIVEW
AY
M2
M2
M2
2160
M2
2050
M2
2200
M2 2100
M2
M2
2150
M2
M2
19300
M2
19001
M2
19145
M2
1820
M2
19320
M2
2055
M1/P1
2015
M1
M2
19250
M2
19475
M2
2525
M2
1925
C3
M2 1977
M2
M2
M22545
M2
M2
M2 M2M2
1983
M2
M2
2301
M2
1999
M2
2301
M2
1995
M2
1971
M2
1991
M2
2301
M2
18932
R1
18931
R1
18931
R1
18932
R1
2221
M2
2275
M2 2227
M2
2269
M2
18826
R1
18814
R1
18832
R1
18902
R1
18926
R1
18920
R1
18813
R1
18819
R1
18825
R1
18901
R1
18907
R1
18919
R1
18831
R1
18907
R1
18813
R1
18819
R1
18913
R1
18902
R1
18908
R1
18926
R1
18820
R1
18826
R1
18920
R1
18820
R1
18826
R1
18902
R1
18908
R1
18932
R1
2233
M2
2215
M2
2263
M2
2281
M2
2293
M2
2203
M2
2241
M2
2251
M2
2293
M2
2251
M2
F
190TH
VAN NESS
GRAMERCY
TOYOTA
HAAS
W
ILTON
PRIVATE DRIVEW
AY
PRIVATE STREET
PRIVATE DRIVEW
AY
PRIVATE DRIVEW
AY
M2
M2
M2
2160
M2
2050
M2
2200
M2 2100
M2
M2
2150
M2
M2
19300
M2
19001
M2
19145
M2
1820
M2
19320
M2
2055
M1/P1
2015
M1
M2
19250
M2
19475
M2
2525
M2
1925
C3
M2 1977
M2
M2
M22545
M2
M2
M2 M2M2
1983
M2
M2
2301
M2
1999
M2
2301
M2
1995
M2
1971
M2
1991
M2
2301
M2
18932
R1
18931
R1
18931
R1
18932
R1
2221
M2
2275
M2 2227
M2
2269
M2
18826
R1
18814
R1
18832
R1
18902
R1
18926
R1
18920
R1
18813
R1
18819
R1
18825
R1
18901
R1
18907
R1
18919
R1
18831
R1
18907
R1
18813
R1
18819
R1
18913
R1
18902
R1
18908
R1
18926
R1
18820
R1
18826
R1
18920
R1
18820
R1
18826
R1
18902
R1
18908
R1
18932
R1
2233
M2
2215
M2
2263
M2
2281
M2
2293
M2
2203
M2
2241
M2
2251
M2
2293
M2
2251
M2
Prepared using City of Torrance Community Development Geographic Information System Michelle G. Ramirez, Community Development Director
.
CUP24-00012, CUP24-00013, EAS24-00001,
DIV24-00004
2160 W 190th Street
(APNs: 7352-016-001 through -003)
LEGEND
Notification Area
APNs: 7352-016-001, 7352-016-002, 7352-016-003
LOCATION AND ZONING MAP
0 300 600150
Feet
33 ATTACHMENT 2
C UP24-00012 (D. Aoki CCM 08.19.25) - Page 1 of 2
Daily Breeze
2615 Pacific Coast Highway #329
Hermosa Beach, California 90254
(310) 543-6635
0011749608
City of Torrance
3031 Torrance Blvd
Torrance, California 90503
PROOF OF PUBLICATION
(2015.5 C.C.P.)
STATE OF CALIFORNIA
County of Los Angeles
I am a citizen of the United States and
a resident of the County aforesaid; I
am over the age of eighteen years, and
not party to or interested in the above-
entitled matter. I am the principal clerk
of the printer of Daily Breeze, a
newspaper of general circulation,
printed and published in the City of
Torrance*, County of Los Angeles, and
which newspaper has been adjudged a
newspaper of general circulation by the
Superior Court of County of Los
Angeles, State of California, under the
date of June 15, 1945, Decree No.
Pomo C-606. The notice, of which the
annexed is a printed copy (set in type
not smaller than nonpareil), has been
published in each regular and entire
issue of said newspaper and not in any
supplement thereof on the following
dates, to wit:
08/08/2025
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.
Dated at Hermosa Beach, California
On this 8th day of August, 2025.
______________________________
Signature
*Daily Breeze circulation includes the following
cities: Carson, Compton, Culver City, El
Segundo, Gardena, Harbor City, Hawthorne,
Hermosa Beach, Inglewood, Lawndale,
Lomita, Los Angeles, Long Beach, Manhattan
Beach, Palos Verdes Peninsula, Palos Verdes,
Rancho Palos Verdes, Rancho Palos Verdes
Estates, Redondo Beach, San Pedro, Santa
Monica, Torrance and Wilmington
34 ATTACHMENT 3
C UP24-00012 (D. Aoki CCM 08.19.25) - Page 2 of 2
35 AGENDA ITEM NO.
8 B
DATE:
May 7
, 202
5 TO:
Planning Commission
FROM:
Luis E. Velazquez
, Planning
Associate
SUBJECT:
2 160
W. 190th
Street (APN
s
7352
-
016
-
001
through
-
0 0
3 )
Conditional Use Permit
(
CUP
2 4
-
0 0012
)
Conditional Use Permit (CUP2
4 -
0 0013)
Division of Lot (DIV
24 -
0 0
00 4
)
Environmental Assessment (EAS2
4 -
0 0
001
)
Consideration
of an
Environmental Assessment for the adoption of a Mitigated Negative Declaration
(MND)
, and approval of a Conditional Use Permit
(CUP24
-
00012 and
CUP24
-
00013)
to allow the construction
of
two industrial buildings totaling 276,300
square feet on a 14.02 acre site, in conjunction with a Division of Lot
(DIV24
-
00004)
to
consolidate three existing parcels into two parcels on property located in the Heavy
Manufacturing
Zone
(M
-
2)
at 2160 West 190
th
Street (APNs 7352
-
016
-
001
,
7352
-
016
-
00 2, and
7352
-
016
-
003)
. The request is
referred to as the
“
Sequoia Commerce Center
Project
.
”
RECOMMENDATION
Recommendation of the Community Development Director that Planning Commission conduct a
public
hearing
and
consider adoption of
Resolution No
s
. 2
5 -
0 33
, 2
5 -
0 34
,
25 -
0 35
and 2
5 -
0 36
for
adoption of
a Mitigated Negative Declaration
in accordance with the California Environmental Quality Act (CEQA) ,
and approval
of
CUP24
-
00012 and CUP24
-
00013
to
allow the construction of two industrial buildings
totaling 276,300 square feet on a 14.02 acre site, in conjunction with DIV24
-
00004
to consolidate three
existing parcels into two parcels on property located in the M -
2 Zone at 2160 West 190th Street (APNs
7352
-
016
-
001, 7352
-
016
-
002, and 7352
-
016
-
003). The request is referred to as the “Sequoia
Commerce Center Project.”
EXECUTIVE SUMMARY
The
project
applicant
,
RREEF America, LLC
,
request
s approval by Planning Commission
to
allow the
construction of two industrial buildings totaling 276,300 square feet on a 14.02 acre site, in conjunction with a
DIV24
-
00004
to consolidate three existing parcels into two parcels on property located in the M -
2 Zone at 2160 West 190th Street (APNs 7352
-
016
-
001, 7352
-
016
-
002, and 7352
-
016
-
003). The
request is referred to as the “Sequoia Commerce Center Project.”
The proposed buildings would be constructed to a maximum of 45 feet in height and designed in a contemporary architectural style to be visually compatible with adjacent buildings and uses. The primary color scheme of the proposed building would include var ying shades of white, grays, and dark grays
and would be further accented with reflective glazing. Building 1 is designed with 16 dock doors on the east
-
facing side of the building and Building 2 is designed with 28 dock doors on the east -
facing side of
th
e building.
The office locations are designated to be located at the corners of the buildings.
T
he development standards of the
M
-
2 Zone
and the Torrance
Municipal
Code (TMC) are applicable to
the
project
, and therefore
require discretionary
review and approval
of
the following entitlement
s
:
•
Conditional Use Permit (
CUP24
-
00012 and CUP24
-
00013
)
to
allow
construction of a
manufacturing, storage, or office building 15,000 square feet or greater in size ;
and
1 36
ATTACHMENT 4
•
Tentative Parcel Map
(
DIV24
-
00004
) to
allow the
consolidat
ion of
three
parcels into
two
.
Staff has reviewed the
project
and
determined
compliance
with the
objective development standards of
the
M
-
2 Zone
and
consistency
with the
Business Park
(
I
-
BP
)
land use designation
.
T
he
potential
environmental
impacts associated with the
project
were
assessed
through
an Initial Study
/Mitigated
Negative Declaration
(IS/MND)
,
which
found
there is
no substantial evidence
that
the project
would
have a significant effect on the environment when mitigation measures are incorporated
into the project
.
S
taff recommends adoption of a Mit
igated Negative Declaration (MND) and approval of the
project
.
The
balance of this report provides an overview of the
p
roject
.
Staff notes the
project
plans,
and all related documents are readily available for public review on the
City webpage
(
https://bit.ly/SequoiaCommerceCenter
)
ENVIRONMENTAL REVIEW
Environmental Assessment
In accordance with the CEQA, the potential environmental impacts associated with the project were assessed in an IS/MND that was prepared by T&B Planning, Inc. for the City of Torrance, as the Lead Agency (
Attachment
4 )
.
The IS/MND, through its various technical studies (i.e., air quality, noise, sewer, traffic), substantiates that the potential environmental impacts associated with the implementation and operation the project would be reduced to less than significant with
the incorporation of
M
itigation
M
easures
(MMs)
that are
monitored and enforced by a Mitigation Monitoring and Reporting Program (MMRP , Attachment
5 )
.
The IS/MND found that
construction
and operation of the project would result in either no impact or less than significant impact in the following topics of environmental analysis:
Aesthetics
, Agriculture and Forestry Resources, Air Quality, Biological Resources, Energy, Greenhouse Gas Emissions, Hydrology
and
Water Quality, Land Use
and
Planning, Mineral
Resources, Noise, Population
and
Housing, Public Services, Recreation, Transportation,
Utilities
and
Services Systems,
and
Wildfire.
The IS/MND found that implementation and operation of the project would result in less than significant impacts with the incorporation of mitigation measures in the following topics of environmental analysis:
Cultural
Resources, Geology and Soils,
Hazards
&
Hazardous Materials
, and Tribal Cultural
Resources.
A copy of the IS/MND and all project documents incorporated by reference were circulated for public review and comment during a 30
-
day period that began on March 6, 2025 and ended April 7, 2025, and were made readily available at the City of Torrance Permi t Center, as well as the State Clearinghouse
webpage and the City webpage (
https://bit.ly/SequoiaCommerceCenter
).
Announcement of the
IS/MND
and its availability for public review and comment was made through a Notice of Intent (NOI) that was filed with the State Clearinghouse and the Los Angeles County Registrar -
Recorder/County Clerk, as well as advertised in the local newspaper (The Daily Br eeze) and mailed to
the registered owner of properties located within a 500’ radius of the project site. A copy of the NOI was also posted on the public notice board located at City Hall and on the City webpage, as well as posted
at the project site.
During the public review and comment period, affected public agencies and any interested parties were able to submit comments on the adequacy of the
IS/MND
in identifying and analyzing the potential
environmental impacts of the project and the ways in which potentially significant effects can be avoided or mitigated. A total of
3 comment letters (
2 public agency,
1 individual) were received during the public
review period. All comments received have been reviewed to determine whether any new substantial 2 37
environmental issues have been raised that were not previously assessed, and although CEQA does not require a formal response to comments received on the IS/MND, a “Response to Comments” was nonetheless prepared to provide
the decision
-
making body
with additional information upon which to
base their decision. Staff notes the comment letters received are attached to the Response to Comments (Attachment 7).
Based
on the
assessment contained in
the IS/MND
and the information contained in the
comment letters
as well as the Response to Comments
, no new substantial environmental issues were identified and all issues raised in the comment letters have been adequately addressed in the IS/MND and in the Response to Comments. All potential environmental impacts associated with the project were found
to
be less than significant with the incorporation of mitigation measures, as monitored and enforced by the
MMRP
. Therefore
, the findings and conclusions of the IS/MND are not affected and recirculation is not required.
Environmental Determination
As the decision
-
making body relative to the project, it is the role of the Planning Commission to review the assessment provided within the
IS/MND
and the information contained in the
comment letters
as
well as the Response to Comments, and to determine the extent of any potential environmental impacts.
If, on the basis of the
IS/MND
and related public testimony, the Planning Commission finds there is no substantial evidence that the project would have a significant effect on the environment, the appropria te
action would be to adopt
an
MND.
In the judgment of staff, based on the assessment contained in the IS/MND
and the information
contained in the
comment letters
as well as the Response to Comments,
no new substantial
environmental issues have been identified and all issues raised in the comment letters have been adequately addressed in the IS/MND and in the Response to Comments. All potential environmental impacts associated with the project were fo
und to be less than significant with the incorporation of mitigation measures,
as monitored and enforced by the MMRP
.
Therefore, staff recommends adoption
of an
MND (Attachment 1).
DISCUSSION
General Plan Land Use Designation and Zoning Designation
The project site has a General Plan land use designation of Business Park (I -
BP), which allows a
maximum FAR of 0.6. Development in the I
-
BP land use
designation is characterized by a mixture of
business, professional and medical office, research and development, and light industrial uses. The proposed warehouse and office building is consistent with the Business Park land use designation.
Adjacent Land Uses and Zoning Designations
The project site is designated as M
-
2 Zone . The adjacent parcels to the north, south and east share the same zoning designation and are developed as warehouses and a refinery. The adjacent parcels to the west are designated as
General Commercial (
C
-
2 )
Zone and are developed as an auto repair
shop and professional offices.
NORTH:
R
-
1 Single
-
Family Residences
SOUTH:
M
-
2 Light
Industrial Building
EAST:
M
-
2 Professional Office Building
WEST:
M
-
2 Oil Refinery
3 38
Existing Site Improvements and Natural
Features
The project site is parallel to 190th Street, rectangular in shape and relatively flat.
The project site
comprises three parcels totaling approximately 14.02 acres, currently developed with 12 buildings totaling 275,635 square feet, along with landscaped parking areas and drive aisles.
Multiple tenants for
various uses currently occupy the buildings including chemical manufacturer, surgical device manufacturer, compressor parts sales, specialty packing and logistics, pharmacy, flooring manufacturer, clothing designer, and general offices
.
There
are no outstanding natural features on the
site.
T
he Project site is located within an urbanized environment with nearby industrial, commercial, and residential uses. Surrounding land uses include residential uses to the north across West 190th Street, commercial buildings to the south across 195th Street
, commercial building to the east, and the
Torrance Refinery to the west across Van Ness Avenue.
Division of Lot
The project
involves
DIV
24 -
00004
to allow the consolidation of
three
parcels into
two
.
Staff
reviewed
the map
and
found
its
design
and improvements are
consistent with the
General Plan
and
in
compliance
with
the Subdivision Map Ordinance
of the
TMC
as well as
the
Subdivision Map Act
of the State of
California.
Site Design
and
Building
Architecture
Building 1 would be located in the northern portion of the project site, while Building 2 would be situated in the southern portion.
The
proposed project complies with the design guidelines of the M -
2 Zone,
which emphasize appropriate scale, placement, and architectural compatibility with the surrounding area. The project enhances the existing industrial character by introducing a tilt -
up
warehouse that
integrates seamlessly with the adjacent industrial buildings to the east and south. The building incorpor
ates modern industrial design elements consistent with recent architectural trends within the City and the region.
The site layout is designed to ensure a seamless transition in scale and functionality. The loading docks for both buildings are strategically positioned along the east elevations, minimizing visibility from the public right
-
of
-
way. Each building is centra
lly located on its respective parcel, allowing for generous setbacks from all property lines. Notably, a 92
-
foot setback along 190th Street provides a substantial
buffer from the public realm, enhancing the project's compatibility with its surroundings.
The architectural design features articulated building masses, varied elevations, and modulated rooflines to enhance visual interest. The building's exterior will feature tilt -
up concrete panels, painted
and scored to create wall plane variation and add vi
sual appeal. The primary field color of the building
will be Sherwin
-
Williams Origami White, complemented by a light accent color of Essential Gray .
The
ribbed concrete panels will incorporate accent colors of Downing Slate, with darker accent areas utiliz ing
Iron Ore, creating a dynamic contrast while maintaining an industrial aesthetic.
The building’s canopies
will be finished with clear anodized Alucobond, while the glazing will feature PPG SolarCool Pacifica clear anodized storefront. These elements, together with the varied color palette, help create a visually appealing and modern ind
ustrial design that blends with the surrounding area.
Additionally, the project includes a comprehensive landscaping plan, with plantings along the building façade and throughout the parking lot. The largest landscape buffer will be located along Van Ness Avenue and 190th Street, contributing to a softened pe
destrian scale and reducing the visual impact of
the proposed development.
4 39
Provided below is a
Project
summary:
Project Building Summary
Building 1
Building 2
Lot Area
271,739 sf (
6.24 acres
)
338,891
sf
(
7.78 acres)
Building Height
45’
45’
Use
Scenario
Warehouse
Manufacturing
Warehouse
Manufacturing
Floor Area
Office
15,000
s
f
15,000
sf
15,000
s
f
15 ,000
sf
Warehouse
105,466
sf
69,000
sf
140,834
s
f
95 ,000
sf
Manufacturing
0 sf
36,466
sf
0 sf
45 ,
834
sf
Total
120,466
sf
120,466
sf
155,834
sf
155,466
sf
Floor Area Ratio
0. 443
0. 460
Parking
Office
60 60
60 60
Warehouse
70 24
94 31
Manufacturing
0 173
0 238
Parking Required
130
spaces
257
spaces
154
spaces
328
spaces
Parking Provided
208
spaces
256
spaces
236
spaces
329
spaces
Property Line /
Street
Proposed
Setback
Required
Setback
Proposed
Setback
Required
Setback
North
/
190th
Street
92 ’
0’
66’
0’
South / 195th Street
66’
0’
63’
0’
East
85 ’
0’
85’
0’
West /
Van Ness Avenue
69’
0’
69’
0’
Landscaping
40,000 sf
14.72%
42,000 sf
12.39%
Building Height
The project features building heights that are
consistent with the
M
-
2 development standards and that
demonstrate transition and scale to maintain conformity with the neighboring structures. The project proposes a maximum building height of 45’ to the topmost portion of the roof with portions dropping to 43’ and 41’ to enhance articulation.
Staff notes the
M
-
2 Zone does not identify a
maximum building
height
and instead refers to the Building Code of the City of Torrance.
Building Use
,
Floor Area Ratio,
and
Floor
Plan
,
The project consists of two industrial buildings, with Building 1 located in the northern portion of the site and Building 2 in the southern portion. Both buildings are designed to accommodate either warehousing 5 40
or manufacturing uses, consistent with the permitted uses in the M -
2 Zone. While the site plan allocates
specific square footage to warehousing and manufacturing, the final mix of uses may vary based on tenant needs.
Under a warehousing use, Building 1 will provide 120,466 square feet of warehouse space, including 15,000 square feet of ancillary office space, while Building 2 will feature 155,834 square feet of warehouse space with 15,000 square feet of office space.
If a tenant were to incorporate manufacturing,
a potential configuration could allocate 69,000 square feet of Building 1 for manufacturing, with the remaining 36,466 square feet used for warehousing and 15,000 square feet for office space. Similarly, Build
i
ng 2 could include 95,000 square feet of manufacturing space, 45,834 square feet of warehousing, and 15,000 square feet of office space. However, the actual distribution of uses will be determined by future tenants.
The office components are strategically positioned at the corners of each building to optimize functionality and accessibility. Building 1 is designed with 16 dock doors along its east elevation, while Building 2 will have 28 dock doors on its east
-
facing
side. The buildings are designed to ensure all
business operations occur within enclosed spaces, except for traffic movement, parking, and loading/unloading activities at designated bays and trailer parking stalls. Per contemporary industry standards, non
-
diesel
-
powered equipment such as yard trucks, hostlers, pallet jacks, and forklifts will be used for cargo handling.
Parking
The project provides on
-
site parking for two industrial buildings, with capacity designed to accommodate industrial
uses.
Parking requirements are calculated based on a range of potential tenant uses, including office, warehouse, and manufacturing space.
The site is divided into two parcels, each
containing one of the proposed buildings.
Under the warehouse scenario, Building 1 requires 130 spaces and Building 2 requires 257 spaces, for a total of 387 required spaces. In this scenario, both
proposed buildings
meet or exceed their respective
parking
requirements.
Under
the manufacturing scenario, Building 1 requires 257 parking spaces and provides 256, resulting in a shortfall of one space. Building 2 requires 328 spaces and provides 329, resulting in a surplus of one space. While Building 1 reflects a minor deficiency,
the overall
project
would
meet the parking requirement with no net shortfall.
Building
Setback
s
T
he
project
features building
setbacks
that
are consistent with the
M
-
2 development standards
and
complimentary to
the neighboring industrial buildings
.
The building setbacks
have been
designed to
achieve clear and recognizable transitions by
provid
ing
wide
landscape setbacks
along
190th
Street
and
Van Ness Avenue
that offer
broad separation
from the
public right of way
.
Landscaping
The project features
landscap
ing
that
is
consistent with the
development standards of the
TMC
and that
make a positive contribution to the aesthetics and function of the site.
The
TMC
requires no less than
five percent of a parking lot comprising more than 20 parking spaces to be landscaped. The proposed project
provides
a total of
13.43 %
of parking lot landscaping, totaling
82,000
square feet
, well beyond
the
minimum required
.
T
he project
incorporates
landscap
e setbacks
along
the site perimeter
t
hat
provide an attractive view from the street
and
a softened
human scale for pedestrians.
L
andscaping
is
distributed
around the base of
proposed building
and
alongside
the public right of way
as well as
the
parking
area
s
.
Staff notes that the preliminary landscaping plans indicate new trees are proposed along the eastern property line. During a site visit, staff observed existing trees located within the adjacent parcel to the east that may interfere with the placement or g rowth of the proposed trees. To address
this potential conflict, a condition has been added requiring tree diamonds along the
eastern parking
stalls to ensure proper tree spacing and health.
6 41
C
ONCLUSION
In the judgment of staff, the project is consistent with the M
-
2 Zone and the
I
-
BP
land use designation,
which
permits
traditional industrial uses such as
manufacturing, processing, warehousing, packaging
or treatment of products
and contains some of the largest
buildings
compared to other
land uses.
The project design builds on the existing character of the surrounding area by introducing
an
industrial
building that is compatible with the neighboring industrial buildings. The project
features design
elements that a
re consistent with recent
trends in industrial architecture within the City and throughout the region.
The proposed maximum height of the warehouse aligns with the existing heights of the neighboring industrial buildings
.
In addition, the project architecture demonstrates appeal through modulation of building
masses and
represents an improvement to the area.
T
he potential environmental impacts associated with the
project
were assessed
through
an IS/MND,
which found there is no substantial evidence that the project would have a significant effect on the environment when
MM
s are incorporated into the project.
Lastly, the project
would allow for additional business and employment growth within the City. The General Plan recognizes the importance of the area as a means to achieve employment objectives and promote viable industrial development.
For these reasons,
staff recommends adoption of a MND and approval of the
project
,
subject to
conditions.
FINDINGS OF FACT
AND
CONDITIONS OF APPROVAL
Staff has prepared draft fi
ndings
and conditions of approval
for
consideration by the Planning
Commission
that are
listed
in the attached Resolution
s
(Attachment 1)
.
CODE REQUIREMENTS
Staff has prepared a partial list of requirements from the TMC
, California Building Code
(CBC)
,
California Fire Code
(CFC)
, et al.
,
that are pertinent to the project (Attachment
3 ). Not all requirements
are
provided,
and the applicant is strongly advised to contact each individual Department/Division for
more information
. The requirements are not subject to modification and the Planning Commission cannot
waive or alter the requirements.
PUBLIC NOTICE
In accordance with
the
TMC
, notices of the public hearing were made no less than 10 calendar days before the Planning Commission meeting. Notices were also posted at the project site
in four
conspicuous locations
and
were
mailed
on
April
11 , 202
5 ,
to the registered owner of properties located
within a 500’
radius of the exterior boundaries of the project site. Notices were also published in the local newspaper (The Daily Breeze)
and posted
on the City of Torrance webpage
.
7 42
RIGHT OF APPEAL
In accordance with
TMC
Section
95.1.7 , decisions made by the Planning Commission may be appealed to the City Council within 15 calendar days of adoption of the Resolution s
. For more information, please
contact the City Clerk’s Office by telephone at (310) 618 -
2870 or email at
[email protected]
.
PROJECT PLANS
T
he
project plans and all related documents are readily available for public review at the Permit Center (Planning Counter) located at City Hall, 3031 Torrance Boulevard, Torrance CA 90503, during normal business hours open 8:00am to 5:00pm, Monday through Thu rsday, open alternate Fridays.
Appointments are available by contacting the Planning Division at (310) 618 -
5990.
In addition, the
project plans and all related documents are readily available for public review on the City webpage
https://bit.ly/SequoiaCommerceCenter
.
A
TTACHMENTS
1. Resolution
No
s
.
2 5
-
0 33
, 2
5 -
0 34
,
25 -
035
and 2
5 -
0 36
2. Location and Zoning Map
3. Partial
Code Requirements
4. Initial Study/Mitigated Negative Declaration (
Limited
Distribution)
5. Response to Comments
(Limited Distribution)
6. Mitigation Monitoring and Reporting Program
(Limited Distribution)
7. Project Plans
STAFF CONTACT
Luis Velazquez, Planning
Associate
8 43
ITEM 8B
ATTACHMENT 1
RESOLUTION NOS. 25-033, 25-034, 25-035 and 25-036
ITEM 8B
ATTACHMENT 1
9 44
PLANNING COMMISSION RESOLUTION NO.
25 -
033
A
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING A
CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
120
,466 S
QUARE
F
OOT
INDUSTRIAL WAREHOUSE
BUILDING ON PROPERTY LOCATED IN THE
HEAVY
MANUFACTURING ZONE
AT 2160 W. 190TH STREET
.
CUP24
-
00012
:
RREEF
AMERICA
, LLC (IPERS SEQUOIA COMMERCE CENTER)
WHEREAS
, the Planning Commission of the City of Torrance
conducted a duly noticed
public hearing
on
May 7
, 2025
to consider an application
filed by
RREEF America, LLC (IPERS
Sequoia Commerce Center)
for adoption of a Mitigated Negative Declaration
(MND)
in
accordance with the California Environmental Quality Act (CEQA), and for approval of a Conditional Use Permit
(
CUP24
-
00012)
to
allow the construction of a 120,466 s
quare
f
oot
industrial warehouse building
in conjunction with a Division of Lot
(DIV24
-
00004)
to consolidate
three existing parcels into two parcels on property located in the M -
2 Zone at 2160 West 190
th
Street
, referred to as the
Sequoia Commerce Center Project
; a
nd
WHEREAS,
due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1, Article 41 of the Torrance Municipal Code
(TMC)
; and
WHEREAS
,
based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the
Sequoia Commerce Center Project
;
and
WHEREAS
, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a)
That the property is located at
2160
W. 190th Street
(APNs 7352
-
016
-
001, 7352
-
016
-
002,
and 7352
-
016
-
003)
;
b)
That the
subject
parcel
(
APN 7352
-
016
-
001
)
is described
“*
TR=PART OF THE RANCHO SAN
PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON
E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES D
OMINGUEZ 638.94 ACS ALLOT
”
as per map recorded in the Office of the Los Angeles
County Recorder, State of California;
c)
That the
subject
parcel
(
APN
7352
-
016
-
002
)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT
1” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
d)
That the subject parcel (APN 7352
-
016
-
003)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT 2” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
e)
That
the
project
, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project
have been
assessed through an Initial Study/Mitigated Negative Declaration
(IS/MND)
in accordance
10 45
with the CEQA
. The
project
would not have a significant effect on the environment when mitigation measures are incorporated and therefore
an MND
was adopted
;
f)
That the project is conditionally permitted within the M -
2 Zone and complies with the objective
development standards of the Torrance Municipal Code and is consistent with the Business
Park
(I
-
BP
) land use designation of the General Plan of
the City of Torrance
;
g)
That the project, as conditioned, will not impair the integrity and character of the M -
2 Zone
because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the
south
and east,
and
the petroleum refinery to the
west;
h)
That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography
and existing access to public
right
-
of
-
way support the proposed development without requiring substantial site alteration ;
i)
That
the project, as conditioned, will be compatible with existing and proposed future land uses within the M
-
2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial building s to the
south
and
east, and
the petroleum refinery to the
west
;
j)
That
the project, as conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the
I
-
BP
land use designation, which is
characterized by manufacturing industries which
process raw or extracted substances, or which use hazardous materials .
Permitted uses
include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products
;
k)
That
the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal thro ugh modulation
of building masses, elevations, and rooflines that promote visual interest ;
l)
That
there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by all necessary utilities and public services. In addition, the project applicant is required to pay development impact fees to offset the incremental increase in the demand for public servic es
;
m)
That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded by three streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minim um requirement for onsite
parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n)
That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has
been thoroughly reviewed
and found to be in compliance with the objective development standards of the M -
2 Zone and
is consistent with the
I
-
BP
land use designation;
o)
That the project, as conditioned, will not
produce
any or all of the following results
:
•
Damage and nuisance
from noise, smoke odor, dust or vibration
,
•
Hazard from explosion, contamination or fire
,
11 46
•
Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of peop
le or vehicles; and
WHEREAS
, the Planning Commission by the following roll call vote
APPROVED
CUP
24 -
00012
, subject to conditions:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED
that
CUP24
-
00012
filed by
RREEF AMERICA, LLC
(IPERS Sequoia Commerce Center)
to allow
the construction of a
120,466 sf
industrial warehouse
building
on property located in the M
-
2 Zone at 2160 West 190
th
Street
, referred to as the
Sequoia
Commerce Center
Project
, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP
24 -
000
12 ;
and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the
TMC
on file in the office of the Community
Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or
other documents presented by
the applicant to the
Community Development Department and upon which the Planning Commission relied in granting approval
;
2. That if
CUP
is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That a copy of Planning Commission Resolutions
and the Mitigation Monitoring and Reporting
Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation of the conditio
ns of approval and the mitigation measures; (Planning)
4. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
5. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
6. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas
; (Planning)
7. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
8. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
9. That no truck terminal, truck stop, or similar operation shall be permitted on -
site; (Planning)
10. That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
12 47
11. That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
12. That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
13. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on -
site; (Planning)
14. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights
-
of
-
Way; (Planning)
15. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters , pipes,
transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material
shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
16. That all windows/glazing
below an elevation of 10 feet
shall be provided with a protective film
or other technology to prevent graffiti
.
In addition, protective film or equivalent anti
-
graffiti
measures shall be applied to all corner office entryways ; (Planning)
17. That any future request for a Wireless Antenna Facility shall require separate
approval and
would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
18. That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the California Environmental Quality Act (CEQA), and such use is reviewed and approved by the Community Development Dep
artment; (Planning)
19. That the total floor area devoted to manufacturing shall not exceed 69,000 square feet. Any future expansion of floor area beyond this limit shall require prior review and approval by the Community Development Department to assess compliance with parking r equirements;
(Planning)
20. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
21. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integra l part of the facade, matching
color and materials to the satisfaction of the Community Development Director; (Planning)
22. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street. The applicant shall continue to work with Fire, Engineering and Planning Staf f for the siting and
painting of all exterior equipment, including, but not limited to, electrical transformers and double
-
check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be
13 48
screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
23. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project s ite perimeter prior to
the issuance
of grading permits to the satisfaction of the Community Development Director; (Planning)
24. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved by the Community Development Director. The
perimeter fencing and decorative wrap shall be installed prior to the issuance
of grading
permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
25. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGC) and shall ensure that all parking areas an d pathways are
provided with adequate illumination, security lights that are non -
glaring, and that all building
lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line sha
ll not exceed 1 foot candle. Light fixtures
in the uncovered parking area shall not exceed 15 feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
26. That a roof plan shall be included with the building plan set for review prior to permit issuance.
The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, elec trical boxes, meters,
pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such
a manner that noise emanating from the roof
appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
27. That a
site
plan shall be submitted with the building plan set for review prior to permit issuance.
The
site
plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel, meter, backflow preventer, double detector check assembly, fire riser, etc. Screening shall comply with al l utility company
and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
28. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade
-
producing trees, and shall
provide state
-
of
-
the
-
art water
saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to pr
ovide an effective screen, to the satisfaction of the
Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off -
site
parkways on Van Ness
Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and shall be maintained to the satisfaction of the Community Development Director
.
That the landscape plan shall comply with the latest State Water Efficient Landscape Ordi
nance; (Planning)
14 49
29. That all trees planted within the project site shall not be less than 24 -
inch
box in size, and that
all shrubs not be less than 1 gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; (Planning)
30. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satis faction of the Community
Development Director; (Planning)
31. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at
intervals
of one tree for every four spaces
along
the eastern row of parking stalls
, consistent
with minimum
tree spacing requirements
.
The placement and spacing of tree diamonds shall
be designed to avoid conflicts with existing trees located on the adjacent eastern parcel, to the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
32. That the applicant shall demonstrate compliance with the City’s Transportation Demand Management (TDM) Ordinance on the submitted plans at the time of Building and Safety plan check review
;
(Transportation Planning)
33. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits .
The plan
shall include, but not be limited to, stop controls, pedestrian and vehicular signage, striping, wayfinding elements, and clearly delineated pedestrian pathways throughout the site .
Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop
signs, yield signs, and directional
signage, as no such features are currently depicted on the submitted plans .
The applicant
shall also consider the implementation of right
-
turn
-
only movements at the eastern driveway
along 190th Street and at the driveways along Van Ness Avenue, given the proximity of the signalized intersection at 195th Street; (Transportation Pla nning)
34. That the project shall comply with current Green Code’s Tier 1 Requirements; (Building and Safety)
35. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code
(CBC)
.
All
deficiencies shall be addressed to the satisfaction of the Building Official; (Building and Safety)
36. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed
buildings; (Environmental)
37. That the
a
pplicant shall install on
-
site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division ; (Environmental/Transportation
Planning)
38. That the applicant shall i
nstall rooftop numbers in order to assist law enforcement and other emergency personnel locate the property
.
The numbers should be 4' high and 2' wide, spaced
12 inches apart, be parallel to the street and be a non -
reflective color that contrasts the color
of the roof
;
(Environmental
/Police
)
39. That t
he applicant shall verify whether a Master Sign Program is on file for the property .
If no
such program exists, the applicant shall prepare and submit a new Master Sign Program
in
compliance with
TMC
911.
5.020
, including a 1
–
2 -
page summary outlining the proposed
signage standards and guidelines
; (
Environmental)
15 50
40. T
hat t
he applicant shall ensure that all
signage
—
including new, modified, or revised signs
—
is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file ; (Environmental)
41. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current NPDES (National Pollutant Discharge Elimination System) requirements
and shall be submitted as part of the building plan check submittal
; (Environmental
/Planning
)
42. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
43. That all connections for water
service shall be made to the stub outs provided (unless stub outs are undersized). If existing stub outs are not used, they shall be abandoned at the main; (
Water
)
44. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right
-
of
-
way and shall be screened from public view w
ith
approved plant material
.
Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT
ISSUANCE
.
Landscape screening shall provide access to water and fire depa rtment at all
times and be maintained diligently to the satisfaction of the Fire Marshal; ( Water
)
45. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (
Water
)
46. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310
-
660
-
6208 for assistance developing plans
and coordinating with
California Department of Health Services; (
Water
)
47. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes
.
The back of walk shall line up with the property
line along Van Ness Ave
nue
and 195th St
reet.
See City of Torrance standard T114;
(Engine
ering)
48. That the applicant/developer shall design and construct a private storm drain system to public standards
.
The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of
Community Development Department
for review and approval prior to issuance of grading permit .
Private storm drain to be
constructed prior to occupancy; (
Engineering
)
49. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
50. That a hydrology study shall be submitted to and approved by the Community Development
Department, Engineering Division prior to approval of the grading plan .
The study shall
include method of detaining the difference between the 10 -
year and 50
-
year storm. Determine
proposed building finished floor elevation with adequate freeboard; (Engineering)
51. That separate sewer laterals shall be provided for each building to the public sewer mainline .
The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the building permit .
The
existing sewer lateral shall be replaced if damage is found; (Engineering)
16 51
52. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance
of
grading permit
.
The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
53. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
54. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on
-
site fire hydrants are installed; (Engineering)
55. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
56. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3
-
port fire hydrants with break
-
off check
valves; (Engineering)
57. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
58. The applicant shall install non
-
glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
59. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
60. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans
.
The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standards to allow selective or universal access to live camera feeds by law enforcement in the event of an active crime or emerg
ency situation; (Police)
61. The applicant shall remove and replace all existing Ficus trees located within the parkway .
Street trees shall be planted in every existing vacant tree well within the parkway .
All
vegetation within the parkway shall not exceed 18 inches in height and shall be free of thorns; and
(Streetscape)
62. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, and adopted this
7 th
day of
M
ay
202
5 .
ATTEST:
__________________________________
____________________________________
Secretary, Torrance Planning Commission
Chairperson, Torrance Planning Commission
17 52
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I,
ROBERT GARCIA
, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the
7t
h day of
Ma
y
202
5 , by the following roll call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
__________________________________
Secretary, Torrance Planning
Commission
18 53
PLANNING COMMISSION RESOLUTION NO.
25 -
034
A
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING A
CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
155,
834 SF
INDUSTRIAL WAREHOUSE BUILDING ON
PROPERTY LOCATED IN THE M
-
2 ZONE AT 2160 W. 190TH
STREET
.
CUP24
-
00013
:
RREEF
AMERICA
, LLC (IPERS SEQUOIA COMMERCE CENTER)
WHEREAS
, the Planning Commission of the City of Torrance
conducted a duly noticed
public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act
(CEQA), and for approval of a
Conditional Use Permit
(
CUP24
-
0001
3 )
to allow the construction of
a
155,834
s
quare
f
oot
industrial warehouse building
in conjunction with a Division of Lot
(DIV24
-
00004)
to consolidate
three existing parcels into two parcels on property located in the M -
2 Zone at 2160 West 190
th
Street
, referred to as the
Sequoia Commerce Center Project
; a
nd
WHEREAS,
due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1, Article 41 of the Torrance Municipal Code (TMC); and
WHEREAS
,
based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the
Sequoia Commerce Center Project
;
and
WHEREAS
, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a)
That the property is located at
2160 W. 190th Street
(APNs 7352
-
016
-
001, 7352
-
016
-
002,
and
7352
-
016
-
003)
;
b)
That the
subject parcel (APN 7352
-
016
-
001)
is described
“*
TR=PART OF THE RANCHO SAN
PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON E
LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT”
as per map recorded in the Office of the Los Angeles
County Recorder, State of California;
c)
That the subject parcel (APN 7352
-
016
-
002)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT 1” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
d)
That the subject parcel (APN 7352
-
016
-
003)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT 2” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
e)
That the
project
, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project
have been
assessed through an Initial Study/Mitigated Negative Declaration (IS/MND) in accordance
19 54
with the CEQA
. The
project
would not have a significant effect on the environment when mitigation measures are incorporated and therefore
an MND
was adopted;
f)
That the project is conditionally permitted within the M -
2 Zone and complies with the objective
development standards of the Torrance Municipal Code and is consistent with the Business Park (I
-
BP) land use designation of the General Plan of the City of Tor rance
;
g)
That the project, as conditioned, will not impair the integrity and character of the M -
2 Zone
because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the south and east, and the petroleum r efinery to the west;
h)
That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography
and existing access to public
right
-
of
-
way support the proposed development without requiring substantial site alteration ;
i)
That
the project, as conditioned, will be compatible with existing and proposed future land uses within the M
-
2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial building s to the south and
east, and the petroleum refinery to the west
;
j)
That
the project, as
conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the
I
-
BP
land use designation, which is
characterized by manufacturing industries which
process raw or extracted substances, or which use hazardous materials .
Permitted uses
include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products
;
k)
That
the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal thro ugh modulation
of building masses, elevations, and rooflines that promote visual interest ;
l)
That
there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by al l necessary utilities and
public services. In addition, the project applicant is required to pay development impact fees to offset the incremental increase in the demand for public services ;
m)
That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded by three streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minim um requirement for onsite
parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n)
That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has
been thoroughly reviewed
and found to be in compliance with the objective development standards of the M -
2 Zone and
is consistent with the I
-
BP land use designation;
o)
That the project, as conditioned, will not
produce
any or all of the following results:
•
Damage and nuisance from noise, smoke odor, dust or vibration,
•
Hazard from explosion, contamination or fire,
20 55
•
Hazard occasioned
by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
WHEREAS
, the Planning
Commission,
by the following roll call vote
APPROVED
CUP24
-
00013
, subject to conditions:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED
that
CUP24
-
00013
filed by
RREEF AMERICA, LLC
(IPERS Sequoia Commerce Center)
to allow the construction of a 155,834
square
f
oot
industrial
warehouse building
on property located in the M
-
2 Zone at 2160 West 190
th
Street
, referred to
as the
Sequoia Commerce Center Project
, on file in the Community Development Department of
the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP24
-
0001
3 ;
and any amendments thereto or modifications thereof as may be approved from time to time
pursuant to Section 92.28.1 et seq. of the Torrance Municipal Code on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in confo rmance with such maps, plans,
specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if Conditional Use Permit is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That a copy of Planning Commission Resolutions
and the Mitigation Monitoring and Reporting
Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation of the conditio
ns of approval and the mitigation measures; (Planning)
4. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
5. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
6. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas
; (Planning)
7. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
8. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
9. That no truck terminal, truck stop, or similar operation shall be permitted on -
site; (Planning)
10. That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
21 56
11. That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
12. That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
13. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on -
site; (Planning)
14. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights
-
of
-
Way; (Planning)
15. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters , pipes,
transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material
shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
16. That
all windows/glazing below an elevation of 10 feet shall be provided with a protective film or other technology to prevent graffiti. In addition, protective film or equivalent anti -
graffiti
measures shall be applied to all corner office entryways; (Planning )
17. That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
18. That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the California Environmental Quality Act (CEQA), and such use is reviewed and approved by the Community Development Dep
artment; (Planning)
19. That the total floor area devoted to manufacturing shall not exceed 95 ,000 square feet. Any
future expansion of floor area beyond this limit shall require prior review and approval by the Community Development Department to assess compliance with parking requirements; (Planning)
20. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
21. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integra l part of the facade, matching
color and materials to the satisfaction of the Community Development Director; (Planning)
22. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street. The applicant shall continue to work with Fire, Engineering and Planning Staf f for the siting and
painting of all exterior equipment, including, but not limited to, electrical transformers and double
-
check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be
22 57
screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
23. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project s ite perimeter prior to
the issuance of grading permits to the satisfaction of the Community Development Director; (Planning)
24. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved by the Community Development Director. The perimeter fencing and decorative wrap shall be installed prior to the issuance of grading
permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
25. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGC) and shall ensure that all parking areas an d pathways are
provided with adequate illumination, security lights that are non -
glaring, and that all building
lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line sha
ll not exceed 1 foot candle. Light fixtures
in the uncovered parking area shall not exceed 15 feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
26. That a roof plan shall be included with the building plan set for review prior to permit issuance.
The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, elec trical boxes, meters,
pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such
a manner that noise emanating from the roof
appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
27. That a site plan shall be submitted with the building plan set for review prior to permit issuance.
The site plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel , meter, backflow preventer,
double detector check assembly, fire riser, etc. Screening shall comply with all utility company and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
28. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be mainta ined to the
satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade
-
producing trees, and shall provide state
-
of
-
the
-
art water
saving irrigation system and/or drip irrigation for all
landscape areas. That trash enclosures,
transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, i
ncluding vegetation screens from headlights positioned
toward the adjacent uses and street frontages. The landscape plan shall include the off -
site
parkways on Van Ness Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and
shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the latest State Water Efficient Landscape Ordinance; (Planning)
23 58
29. That all trees planted within the project site shall not be less than 24 -
inch box in size, and that
all shrubs not be less than 1 gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; ( Planning)
30. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satis faction of the Community
Development Director; (Planning)
31. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at intervals
of one tree for every four spaces along the eastern row of parking stalls, consistent with minimum tree spacing requirements. The placement and spacing of tree diamonds shall be designed to avoid conflicts with existing trees located on the adjacent east ern parcel, to
the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
32. That the applicant shall demonstrate compliance with the City’s Transportation Demand Management (TDM) Ordinance on the submitted plans at the time of Building and Safety plan check review;
(Transportation Planning)
33. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits. The plan shall include, but not be limited to, stop controls, pedestrian and vehi cular signage, striping,
wayfinding elements, and clearly delineated pedestrian pathways throughout the site.
Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop
signs, yield signs, and directional
signage, as no such features are currently depicted on the submitted plans. The applicant shall also consider the implementation of right
-
turn
-
only movements at the eastern driveway
along 190th Street and at the drivew
ays along Van Ness Avenue, given the proximity of the
signalized intersection at 195th Street; (Transportation Planning)
34. That the project shall comply with current Green Code’s Tier 1 Requirements; (Building and Safety)
35. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction of the Building Off icial; (Building and Safety)
36. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed buildings; (Environmental)
37. That the applicant shall install on
-
site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division; (Environmental/Transportation Planning)
38. That the applicant shall install rooftop numbers in order to assist law enforcement and other emergency personnel locate the property. The numbers should be 4' high and 2' wide, spaced 12 inches apart, be parallel to the street and be a non -
reflective col
or that contrasts the color
of the roof; (Environmental/Police)
39. That the applicant shall verify whether a Master Sign Program is on file for the property. If no such program exists, the applicant shall prepare and submit a new Master Sign Program, including a 1
–
2 -
page summary outlining the proposed signage standards a nd guidelines;
(Environmental)
24 59
40. That the applicant shall ensure that all signage
—
including new, modified, or revised signs
—
is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file; (Environmental)
41. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current NPDES (National Pollutant Discharge Elimination System) requirements and shall be submitted as part of the building plan check
submittal; (Environmental/Planning)
42. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
43. That all connections for water service shall be made to the stub outs provided (unless stub outs are undersized). If existing stub outs are not used, they shall be abandoned at the main; (Water)
44. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right
-
of
-
way and shall be screened from public view w
ith
approved plant material. Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT ISSUANCE. Landscape screening shall provide access to water and fire depa rtment at all
times and be maintained diligently to the satisfaction of the Fire Marshal; (Water)
45. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (Water)
46. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310
-
660
-
6208 for assistance developing plans
and coordinating with
California Department of Health Services; (Water)
47. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes. The back of walk shall line up with the property line along Van Ness Avenue and 195th Street. See City of Torrance st andard T114;
(Engineering)
48. That the applicant/developer shall design and construct a private storm drain system to public standards. The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Dev elopment Department
for review and approval prior to issuance of grading permit. Private storm drain to be constructed prior to occupancy; (Engineering)
49. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
50. That a hydrology study shall be submitted to and approved by the Community Development Department, Engineering Division prior to approval of the grading plan. The study shall include method of detaining the difference between the 10 -
year and 50
-
year storm
. Determine
proposed building finished floor elevation with adequate freeboard; (Engineering)
51. That separate sewer laterals shall be provided for each building to the public sewer mainline.
The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the
building permit. The
existing sewer lateral shall be replaced if damage is found; (Engineering) 25 60
52. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to iss uance of
grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
53. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
54. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on
-
site fire hydrants are installed; (Engineering)
55. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
56. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3
-
port fire hydrants with break
-
off check
valves; (Engineering)
57. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
58. The applicant shall install non
-
glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
59. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
60. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans. The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standard s to allow selective
or universal access to live camera feeds by law enforcement in the event of an active crime or emergency situation; (Police)
61. The applicant shall remove and replace all existing Ficus trees located within the parkway.
Street trees shall be planted in every existing vacant tree well within the parkway. All vegetation within the parkway shall not exceed 18 inches in height and sh all be free of thorns;
and (Streetscape)
62. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, and adopted this
7 th
day of
Ma
y
2025
.
ATTEST:
__________________________________ ____________________________________
Secretary, Torrance Planning Commission
Chairperson, Torrance Planning Commission
26 61
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I,
ROBERT GARCIA
, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the
7t
h day of Ma
y
2025, by the following roll call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
27 62
PLANNING COMMISSION RESOLUTION NO.
25 -
035
A
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING
A
DIVISION OF LOT
AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE FOR LOT CONSOLIDATION PURPOSES ON
PROPERTY
LOCATED IN THE
HEAVY MANUFACTURING
ZONE AT 2
160
W. 190TH
STREET.
DIV24
-
00004
:
RREEF
AMERICA
, LLC (IPERS SEQUOIA COMMERCE CENTER)
WHEREAS
, the Planning Commission of the City of Torrance
conducted a duly noticed
public hearing
on
May
7 , 2025
to consider an application
filed by
RREEF America, LLC (IPERS
Sequoia Commerce Center
) for
approval of a
Division of
Lot
(DIV24
-
00004)
consolidate
three
existing parcels into two parcels on property located in the Heavy Manufacturing (
M
-
2 )
Zone at
2160 West 190
th
Street
, referred to as the
Sequoia Commerce Center
Project
;
and
WHEREAS,
due and legal publication of
notice was given to owners of property in the
vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1, Article 41 of the Torrance Municipal Code
(TMC)
; and
WHEREAS
, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a)
That the property is located at
2160
W. 190th Street
(APNs 7352
-
016
-
001, 7352
-
016
-
002,
and 7352
-
016
-
003)
;
b)
That the
subject parcel (APN 7352
-
016
-
001)
is described
“*
TR=PART OF THE
RANCHO SAN
PEDRO ALLOTTED TO MANUEL DOMINGUEZ*LOT COM W ON S LINE OF 190TH ST 2038.47 FT FROM W LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FT TH N ON
E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94
ACS ALLOT”
as per map recorded in the Office of the Los Angeles
County Recorder, State of California;
c)
That the subject parcel (APN 7352
-
016
-
002)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT 1” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
d)
That the subject parcel (APN 7352
-
016
-
003)
is
described as
“
*TR=PARCEL MAP AS PER BK
67 PG 3 OF P M LOT 2” as
per map recorded in the Office of the Los Angeles County Recorder, State of California;
e)
That
the
project
, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project
have been
assessed through an Initial Study/Mitigated Negative Declaration in accordance with the
California Environmental Quality Act (CEQA)
.
The
project
would not have a significant effect
on the environment when mitigation measures are incorporated and therefore a Mitigated Negative Declaration was adopted
;
f)
That the
proposed Division of Lot, together with provision for its design and improvement , is
consistent with the
Business Park
(I
-
BP
) land use designation of the General Plan of the City
of Torrance
;
28 63
g)
That the project is conditionally permitted within the M -
2 Zone and complies with the objective
development standards of the
TMC
and is consistent with the I
-
BP
land use designation of
the General Plan of the City of Torrance
;
h)
That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography
and existing access to public
right
-
of
-
way support the proposed development without requiring substantial site alteration ;
i)
That
the project, as conditioned, will be compatible with existing and proposed future land uses within the M
-
2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial building s to the
south
and
east, and
the petroleum refinery to the
west
;
j)
That the subdivision for con
solidation purposes will not interfere with the orderly development of the City
and will
incorporate a high quality design
;
k)
That the d
esign of the development and subdivision will not
cause
substantial environmental
damage or substantially and avoidably
injure fish or wildlife or their habitat
as potential
environmental impacts have been analyzed in accordance with the CEQA. An Initial Study
(IS)
was prepared, and it was determined that the project, with incorporation of mitigation measures, will not have a significant effect on the environment. A Mitigated Negative Declaration
(MND)
has been prepared and circulated in accordance with CEQA Guidelines;
l)
That the project, as conditioned, will not produced any or all of the following results :
•
Damage and nuisance
from noise, smoke odor, dust or vibration
,
•
Hazard from explosion, contamination or fire
,
•
Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of peop
le or vehicles; and
m)
That the design of the development and
subdivision will not conflict with any public access or easements as all means of public acce
ss are being improved along 190th Street, Van Ness
WHEREAS
, the Planning Commission by the following roll call vote
APPROVED
DIV24
-
00004
, subject to conditions:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
NOW, THEREFORE, BE IT
RESOLVED
that
DIV24
-
00004
filed by
RREEF AMERICA, LLC
(IPERS Sequoia Commerce Center)
for approval of
a
DIV24
-
00004
consolidate three existing
parcels into two parcels on property located in the M
-
2 Zone at 2160 West 190
th
Street
, referred
to as the
Sequoia Commerce Center Project
, on file in the Community Development Department
of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in DIV
24 -
00004;
and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the
TMC
on file in the office of the Community
Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or
other documents presented
by the applicant to the
29 64
Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if
DIV
24 -
00004 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That a copy of Planning Commission Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordinati on and
effective implementation of the conditions of approval and the mitigation measures; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department; and (Engineering)
5. That all conditions of all other City departments received prior to or during the consideration of the project by the Planning Commission shall be met.
Introduced, and adopted this
7 th
day of
Ma
y
202
5 .
ATTEST:
__________________________________ ____________________________________
Secretary, Torrance Planning Commission
Chairperson, Torrance Planning Commission
30 65
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I,
ROBERT GARCIA
, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the
7t
h day of
Ma
y
202
5 , by the following roll call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
31 66
PLANNING COMMISSION RESOLUTION NO.
25 -
036
A
RESOLUTION OF THE PLANNING
COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING
A
MITIGATED
NEGATIVE
DECL
ARATION FOR THE
SEQUOIA
COMMERCE CENTER
PROJECT
IN ACCORDANCE
WITH
THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT
.
EAS
24 -
00001
:
RREEF
AMERICA
, LLC (IPERS SEQUOIA COMMERCE CENTER)
WHEREAS
, the Planning Commission of the City of Torrance
conducted a duly noticed
public hearing
on
May 7
, 2025
to consider an application
filed by
RREEF America, LLC (IPERS
Sequoia Commerce Center)
for adoption of a Mitigated Negative Declaration
(MND)
in
accordance with the California Environmental Quality Act (CEQA)
on property located in the
Heavy Manufacturing (
M
-
2 )
Zone at 2160 West 190
th
Street
, referred to as the
Sequoia
Commerce Center
Project
;
and
WHEREAS,
due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions
of Division 9, Chapter 1, Article 41 of the Torrance Municipal Code; and
WHEREAS
, pursuant to the CEQA,
(
Public Resources Code Section 21000 et seq.) and the
State CEQA Guidelines (California Code of Regulations Section 15000 et seq.), as amended, the City of Torrance is the Lead Agency responsible for preparation and consideration of the environmental review
for the
2160
W. 190th Street Industrial Warehouse Project; and
WHEREAS
, an Initial Study
(IS)
was prepared to assess the potential environmental impacts associated with the
2160
W. 190th Street Industrial Warehouse Project, and said
IS
concluded
that the project may result in or cause potentially significant effects.
However, compliance with
existing policies, plans and regulations, revisions to the plans, together with design features and mitigation measures incorporated would avoid t
he effects or mitigate the effects to levels that
would be less than significant.
Therefore, the City of Torrance
has determined a
MND
is
appropriate and that no further environmental review is required; and
WHEREAS
, notices of the Initial Study/Mitigated Negative Declaration (IS/MND) and its availability for review and comment were filed and circulated for a t
hirty
(30) calendar day period
commencing on
March
6 , 2025, and ending on
April
7 , 2025; and
WHEREAS
, during the review and comment period, affected public agencies and any interested parties were able to comment on the adequacy of the IS/MND in identifying and analyzing the potential environmental impacts associated with the 2160
W. 190th Street Industrial
Warehouse Project and the ways in which potentially significant effects can be avoided or mitigated; and
WHEREAS
, comment letters were received from private parties and public agencies related to the IS/MND prepared for the
2160
W. 190th Street Industrial Warehouse Project, and have
been thoroughly reviewed to determine whether any new substantial environmental issues have been raised; and
WHEREAS
, although CEQA does not require a formal response to each of the comments received on the IS/MND, a Response to Comments has nonetheless been prepared in order to provide the decision
-
making body with additional information upon which to base their decisi on;
and
32 67
WHEREAS
, based on the evaluation in the IS/MND together with all comments received, no new
substantial environmental issues have been raised and that all issued raised in the comment letters have been adequately addressed in the IS/MND and in the Response to Comments .
All
potential impacts associated with the
2160
W. 190th Street Industrial Warehouse Project were
found to be less than significant with incorporation of relevant mitigation measures, where applicable
.
Therefore, the findings and conclusions of the IS/MND are not affected, and no revisions are required or proposed; and
WHEREAS
, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared that list all of the
M
itigation
M
easures
(MMs)
, specifies the appropriate responsible party for
implementing each mitigation measure, and identifies approximate time frames for implementing of each mitigation measure; and
WHEREAS
, the IS/MND and MMRP and all documents and records relating to the 2160
W.
190th Street Industrial Warehouse Project are on file and available for review with the Community Development Department of the City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA 90503; and
NOW, THEREFORE, BE IT RESOLVED
the Planning Commission of the City of Torrance hereby
finds
and
determines
as follows:
a)
That the
IS/MND
was properly prepared and circulated for public review in accordance with the
CEQA
;
b)
That the
IS
/
MND
was carefully considered and all comments thereon, and is the appropriate environmental document for the project, and reflects the independent judgment and analysis of the City of Torrance as the Lead Agency, and that no further environmental review is re
quired;
c)
That with implementation of the mitigation measures identified in the IS
/
MND
and included in
and enforced by the
MMRP
, and on the basis of the whole record and public testimony considered, there is no substantial evidence that the project will have a significant effect on the environment;
d)
That the
MND
is hereby adopted; and
e)
That the
IS
/
MND
and
MMRP
and the documents and records relating to the project are on file with the Community Development Department of the City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA
90503.
INTRODUCED, APPROVED,
and
ADOPTED
at the regular meeting of the Planning Commission
of the City of Torrance held on the
7 th day of
May
2025 by the following roll call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
ATTEST:
__________________________________ ____________________________________
Secretary, Torrance Planning Commission
Chairperson, Torrance Planning Commission
33 68
STATE OF CALIFORNIA )
COUNTY OF LOS
ANGELES) ss
CITY OF TORRANCE )
I,
ROBERT GARCIA
, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the
7t
h day of
Ma
y
202
5 , by the following roll call vote:
AYES:
COMMISSIONERS:
NOES:
COMMISSIONERS:
ABSENT:
COMMISSIONERS:
ABSTAIN:
COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
34 69
ITEM 8B
ATTACHMENT 2
LOCATION AND ZONING MAP
ITEM 8B
ATTACHMENT 2
35 70
F
190TH
VAN NESS
GRAMERCY
TOYOTA
HAAS
WILTON
PRIVATE DRIVEWAY
PRIVATE STREET
PRIVATE DRIVEW
AY
PRIVATE DRIVEWAY
M2
M2
M2
2160
M2
2050
M2
2200
M2 2100
M2
M2
2150
M2
M2
19300
M2
19001
M2
19145
M2
1820
M2
19320
M2
2055
M1/P1
2015
M1
M2
19250
M2
19475
M2
2525
M2
1925
C3
M2 1977
M2
M2
M22545
M2
M2
M2 M2M2
1983
M2
M2
2301
M2
1999
M2
2301
M2
1995
M2
1971
M2
1991
M2
2301
M2
18932
R1
18931
R1
18931
R1
18932
R1
2221
M2
2275
M2 2227
M2
2269
M2
18826
R1
18814
R1
18832
R1
18902
R1
18926
R1
18920
R1
18813
R1
18819
R1
18825
R1
18901
R1
18907
R1
18919
R1
18831
R1
18907
R1
18813
R1
18819
R1
18913
R1
18902
R1
18908
R1
18926
R1
18820
R1
18826
R1
18920
R1
18820
R1
18826
R1
18902
R1
18908
R1
18932
R1
2233
M2
2215
M2
2263
M2
2281
M2
2293
M2
2203
M2
2241
M2
2251
M2
2293
M2
2251
M2
F
190TH
VAN NESS
GRAMERCY
TOYOTA
HAAS
WILTON
PRIVATE DRIVEWAY
PRIVATE STREET
PRIVATE DRIVEW
AY
PRIVATE DRIVEWAY
M2
M2
M2
2160
M2
2050
M2
2200
M2 2100
M2
M2
2150
M2
M2
19300
M2
19001
M2
19145
M2
1820
M2
19320
M2
2055
M1/P1
2015
M1
M2
19250
M2
19475
M2
2525
M2
1925
C3
M2 1977
M2
M2
M22545
M2
M2
M2 M2M2
1983
M2
M2
2301
M2
1999
M2
2301
M2
1995
M2
1971
M2
1991
M2
2301
M2
18932
R1
18931
R1
18931
R1
18932
R1
2221
M2
2275
M2 2227
M2
2269
M2
18826
R1
18814
R1
18832
R1
18902
R1
18926
R1
18920
R1
18813
R1
18819
R1
18825
R1
18901
R1
18907
R1
18919
R1
18831
R1
18907
R1
18813
R1
18819
R1
18913
R1
18902
R1
18908
R1
18926
R1
18820
R1
18826
R1
18920
R1
18820
R1
18826
R1
18902
R1
18908
R1
18932
R1
2233
M2
2215
M2
2263
M2
2281
M2
2293
M2
2203
M2
2241
M2
2251
M2
2293
M2
2251
M2
Prepared using City of Torrance Community Development Geographic Information System Michelle G. Ramirez, Community Development Director
.
CUP24-00012, CUP24-00013, EAS24-00001,
DIV24-00004
2160 W 190th Street
(APNs: 7352-016-001 through -003)
LEGEND
Notification Area
APNs: 7352-016-001, 7352-016-002, 7352-016-003
LOCATION AND ZONING MAP
0 300 600150
Feet
36 71
ITEM 8B
ATTACHMENT 3
PARTIAL CODE REQUIREMENTS
ITEM 8B
ATTACHMENT 3
37 72
CODE REQUIREMENTS
The following is a partial list of Code requirements applicable to the proposed project.
Not all
Code requirements are provided and the applicant is strongly advised to contact each individual department for further clarification.
The Planning Commission
may not waive or alter the Code
requirements. They are provided for information purposes only.
ENVIRONMENTAL
1. Provide handicapped parking to code
2. The Van Accessible loading area shall be at least 8 feet wide and the words "NO PARKING" shall be painted on the ground within each loading access aisle in white lettering no less than 12 inches high and located so that it is visible to traffic enforcement officials.
3. Direct lighting away from residential land uses per Torrance code (
92.30.5).
4. Screen loading dock per Torrance code (92.30.3).
5. Vehicles associated with the proposed development, including employees, clients and visitors are required to park on site.
6. Provide handicap parking to meet federal, state and local code requirements.
7. Double
-
line stripe all parking spaces per Torrance code (93.4.6).
8. No freestanding or A
-
frame signs; signs attached to light or utility poles and trees; inflatable signs; air assisted signs; temporary signs attached/mounted to the roof of the building; persons holding signs or twirlers; electronically moveable signs; elec tronically
changing signs; bow/flag/feather banners; or any other temporary signage that violates Torrance Municipal Code requirements for temporary signs. Permits for banners must be obtained before use. Directional signs and parking signage are allowable .
9. Screen all roof equipment from public view per Torrance code(92.30.2).
BUILDING AND SAFETY
1. All legal exits shall be handicap accessible
2. Comply with 2022 CBC, CMC, CEC, CPC & CGBC
3. Provide automatic fire sprinklers
-
Separate permit is required through Torrance Fire
Division
ENGINEERING
1. Easements shall be shown on Final Parcel Map.
2. Final Parcel Map must record prior to obtaining occupancy permits.
3. All Final Parcel Maps are to be compiled from field survey data unless otherwise approved by the City Engineer. (City Code Section 92.29.7)
4. All physical public improvements which are conditions of this Planning Case must be completed prior to occupancy.
5. Remove all existing structures prior to Final Parcel Map recordation.
6. Planning Commission's approval for a tentative map is effective for two years but may be extended if applied for 90 days prior to expiration of said approval. Official modifications of the tentative map will not affect the original date of approval. (City code Sec. 92.29.13)
7. A Construction and Excavation Permit (C&E Permit) is required from the Community Development Department, Engineering Permits and Records Division, for any work in the public right
-
of
-
way on 190th St., Van Ness Ave., and 195th St. (City Code Sec. 74.6.2) 38 73
8. Close abandoned driveways on Van Ness Ave. with full height curb and gutter to match existing (City Code sec. 74.4.4).
9. Provide evidence of reciprocal cross access easement for shared driveway on Van Ness Ave.
10. Replace portion of
grinded, lifted, and cracked sidewalk per City of Torrance standards on 190th St., Van Ness Ave., and 195th St.
11. That on
-
site drainage shall be collected within the lot and drained through the curb to the public street. (City Code Sec. 81.2.52)
12. Remove (including tree root removal or root grinding) and replace the street tree in the City parkway on 190th St. and Van Ness Ave. (City Code sec. 74.3.2). Contact the Streetscape Division of the Torrance Public Works Department at 310 -
781
-
6900 prior to
tree removal and for information on the type and size of tree to be planted for your area.
13. Install truncated domes on existing wheelchair ramp per City of Torrance standards at the northeast corner of Van Ness Ave. and 195th St. Existing wheelchair ramp shall be replaced if not to current City standards.
WATER
1. A separate water service with radio read meter system is required for each individual lot.
2. Public water facilities needed to serve this site, including as applicable, mains and appurtenances shall be constructed at the cost of applicant/owner per Torrance Municipal Water (TMW) plans and specifications. TMWD shall make final determination/approva l for
location, type, and size of all water facilities.
3. Prior to issuance of building permits, submit to the Permits and Records Division of the Community Development Department a site plan showing the proposed location and size of all water services (domestic, fire and recycled) for the project.
STREETSCAPE
1. Plant 24” box
size Olea Europea Majestic Beauty Street tree in the parkway s. Call the
Streetscape Division for the placement of trees.
39 74
ITEM 8B
ATTACHMENT 4
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
(LIMITED DISTRIBUTION)
ITEM 8B
ATTACHMENT 4
40 https://bit.ly/SequoiaCommerceCenter
75 ITEM 8B
ATTACHMENT 5
RESPONSE TO COMMENTS
(LIMITED DISTRIBUTION)
ITEM 8B
ATTACHMENT 5
41 https://bit.ly/SequoiaCommerceCenter
76 ITEM 8B
ATTACHMENT 6
MITIGATION MONITORING AND REPORTING PROGRAM
(LIMITED DISTRIBUTION)
ITEM 8B
ATTACHMENT 6
42 https://bit.ly/SequoiaCommerceCenter
77 ITEM 8B
ATTACHMENT 7
PROJECT PLANS
ITEM 8B
ATTACHMENT 7
43 78
XX XXX XX
X
X
X
X XX
X
X
X
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
EV ONLYEV ONLY EV ONLYEV ONLY
HB
HB
HB
HB
HB
(62)
(63)
(63)
(64)
(64)
(64)
(65)
(64)
(64)
(63)
(65)
(64)
(65)
(64)
(65)
(65)
(65)
(64)(63)(61)
(60)(59)
(61)
(60)
(61)
(64)
(63)
(63)
(64)
(64)
(64)
(66)
(65)
(65)
(66)
(66)
(65)
(65)
(64)
(62)
(63)
(64)
(64)
(64)
(65)
(65)
(65)
(64)
(66)
(64)
(65)
(63)
(66)
VAN
ACCESS
VAN
ACCESSEV
EV
VAN
ACCESS
VAN
ACCESSEV
EV
TT
RGA
OfficennofnnArchitecturalnnDesignn
15231nAltonnParkway,nSuiten100n
Irvine,nCAnn92618n
Tn949-341-0920n
FXn949-341-0922
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A1-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A1-1P
22065.00
SITE PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
2ND SUBMITTAL8/1/24
VAN NESS AVE
648' 481'
212'
212'
28 DOCK POSITIONS 16 DOCK POSITIONS
8'H GATE
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
140'
140'
PHASE 1PHASE 2
PROJECT INFORMATION
PARCEL:
ZONE
GENERAL PLAN
7352-016-002, 7352-016-003
M2
I-BP
1. A LANDSCAPE PLAN SHALL BE SUBMITTED TO THE COMMUNITY DEVELOPMENT
DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS AND SHALL BE IMPLEMENTED PRIOR TO OCCUPANCY. THE PLAN SHALL UTILIZE
DROUGHT RESISTANT/XERISCAPE PLANT MATERIALS, AND SHALL PROVIDE
STATE-OF-THE-ART WATER SAVING IRRIGATION SYSTEM AND/OR DRIP IRRIGATION FOR LARGER SHRUBS AND TREES. LANDSCAPE SHALL COMPLY WITH STATE
DEPARTMENT OF WATER RESOURCES LANDSCAPE DESIGN & IRRIGATION REQUIREMENTS.
2. THE PROJECT DOES NOT PROPOSE ANY TENANT SIGNAGE AT THIS TIME. SIGNAGE MAY BE SUBMITTED AT A LATER DATE.
3. ALL ROOF-MOUNTED MECHANICAL EQUIPMENT WHICH PROJECTS ABOVE THE
ROOF OF ATHE NEW BUILDINGS AND IS VISIBLE FROM AN ADJACENT PROPERTY OR
ANY PUBLIC STREET SHALL BE SCREENED BY AN APPROVED ENCLOSURE OR PARAPET WHICH IS CONSISTENT WITH THE ARCHITECTURE OF THE BUILDING.
4. THAT EXTERIOR COLOR AND MATERIAL SAMPLES SHALL BE SUBMITTED TO THE
COMMUNITY DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS;
5. A DETAILED WALL/FENCE PLAN, INCLUDING GATES, SHALL BE SUBMITTED TO THE
COMMUNITY DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS.
6. A DETAILED LIGHTING PLAN SHALL BE SUBMITTED TO THE COMMUNITY
DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS.
7. THAT THE APPLICANT SHALL SHOW THE LOCATION OF ALL
ELECTRICAL/MECHANICAL EQUIPMENT LOCATED ON THE PROPERTY AND THE
METHOD OF SCREENING TO THE SATISFACTION OF THE COMMUNITY DEVELOPMENT DIRECTOR. EQUIPMENT CAN NOT BE LOCATED WITHIN THE STREET SETBACK AREAS;
8. ALL FUTURE STREET TREES SHALL NOT BE TRIMMED TO APPEAR LIKE ‘LOLLIPOPS’
9. AT LEAST 2% OF ALL PARKING SPACES MUST BE DEDICATED TO HIGH OCCUPANCY VEHICLES I.E. CARPOOL, VANPOOL, ALTERNATIVE FUEL, ETC.
10. PARKING AREAS HAVING MORE THAN ONE (1) AISLE OR DRIVEWAY SHALL HAVE DIRECTIONAL SIGNS OR MARKINGS PROVIDED IN EACH AISLE OR DRIVEWAY.
11. ALL PARKING AREAS SHALL BE STRIPED WITH DOUBLE LINES (SIX INCHES BOTH
SIDES OF CENTER) BETWEEN STALLS TO FACILIATE THE MOVEMENT INTO AND OUT OF THE PARKING STALLS.
12. POSTS, BUMBERS OR WHEEL-STOPS SHALL BE PROVIDED WHERE PARKING
AREAS BORDER SIDEWALKS WHICH ARE NOT ELEVATED, PUBLIC AND PRIVATE
PROPERTY LINE, BUILDINGS, FENCES OR WALLS, IN SUCH A MANNER THAT NO VEHICLE SHALL OVERHANG OVER A PROPERTY LINE.
GENERAL NOTESVICINITY MAP
W 190TH ST
VAN NESS AVE
15'19'26'9'
10' 19' 26' 8' 6'6'19' 19'35' 35'19'6' 6' 8' 19' 26' 20'19' 15'19'26'9'
56' TYP
153'
40'
30' 67'
45'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
60' 50' 50' 52'
60' 50' 50' 52'
69'
69'5'
5'
56' TYPTYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
50'
42'
42'
35'
8'H GATE
8'H GATE
24 28 30
16 7
47 50
31 7
14 30
30 33
6 33
9 24
1427
4 14
14 14
19 SITE 1SITE 2
W 190TH ST
SITE 1SITE 2
SCALE: 1" = 50'-0" 0' 10' 20' 100'50'
35'19'
5'
35'19'
5'
9 19' 7'
ELEC. ELEC.
6'H TRASH
ENC.
6'H TRASH
ENC.
6'H TRASH
ENC.
6'H TRASH
ENC.
FUTURE PARKING FOR MANUF.
USE (SEE PROJECT DATA ABOVE)
FUTURE PARKING FOR MANUF.
USE (SEE PROJECT DATA ABOVE)
638.26'795.68'
1 9 0 TH S T R E E T
V A N N E S S A V E N U E
1 9 5 TH S T R E E T
3 3 44
45'
REMOVE (E) D/W
45'
REMOVE (E) D/W
45'
REMOVE (E) D/W
42'
REMOVE (E) D/W
49'
REMOVE (E) D/W
PROJECT DATA - WAREHOUSE USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
WAREHOUSE 105,466 SF 140,834 SF 246,300 SF
MANUFACTURING 0 SF 0 SF 0 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
WAREHOUSE @ 1 / 1500 SF 70 94 164
TOTAL 130 154 284
PARKING PROVIDED
STANDARD STALLS 201 229 430
ADA STALLS 7 7 14
TOTAL 208 236 444
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 16 28 44
PROJECT DATA - MANUFACTURING USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
MANUFACTURING 69,000 SF 95,000 SF 164,000 SF
WAREHOUSE 36,466 SF 45,834 SF 82,300 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
MANUF. @ 1 / 400 SF 173 238 410
WAREHOUSE @ 1 / 1500 SF 24 31 55
TOTAL 257 328 585
PARKING PROVIDED
STANDARD STALLS 201 229 430
FUTURE STALLS IN TRUCK YARD 47 93 140
ADA STALLS 7 7 14
TOTAL 255 329 584
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 4 7 11
PROJECT DATA - WAREHOUSE USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
WAREHOUSE 105,466 SF 140,834 SF 246,300 SF
MANUFACTURING 0 SF 0 SF 0 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
WAREHOUSE @ 1 / 1500 SF 70 94 164
TOTAL 130 154 284
PARKING PROVIDED
STANDARD STALLS 201 229 430
ADA STALLS 7 7 14
TOTAL 208 236 444
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 16 28 44
PROJECT DATA - MANUFACTURING USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
MANUFACTURING 69,000 SF 95,000 SF 164,000 SF
WAREHOUSE 36,466 SF 45,834 SF 82,300 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
MANUF. @ 1 / 400 SF 173 238 410
WAREHOUSE @ 1 / 1500 SF 24 31 55
TOTAL 257 328 585
PARKING PROVIDED
STANDARD STALLS 201 229 430
FUTURE STALLS IN TRUCK YARD 47 93 140
ADA STALLS 7 7 14
TOTAL 255 329 584
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 4 7 11
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL
(12) BIKE
RACKS
(12) BIKE
RACKS
1,054' - 8'H TUBE STEEL FENCE
8'H GATE
SITE LEGEND:
ADA PATH OF TRAVEL
NEW 8'H BLACK TUBE STEEL FENCE
LANDSCAPE AREA
SCE PAD-MOUNT TRANSFORMER
SCREEN WITH LANDSCAPE
TYPICAL PARKING STALLS - 8.5' X 19'
WITH 2' OVERHANG, TYP.
DOUBLE STRIPE PER CITY STANDARD
T
TRASH ENCLOSURE PLAN
8'-0" CLR
16'-6" CLR.
PAINTED SOLID STEEL
GATES
PAINTED CONCRETE TILT
UP PANELS
PAINTED SOLID STEEL ROOF
6" X 6" CONC. CURB
3" WIDE WHITE
TRAFFIC PAINT
STRIPING
12" WIDE STEP-OFF
CURB AT
LANDSCAPE
FINGERS / END
STALLS
8'-6"8'-6" SEE PLAN
17'-0"
8'-6" TYP.STANDARD
STALL
END
STALL
12" TYP.
EA. SIDE
2'
19'-0"
TYPICAL PARKING STALL
PARKING OVERHANG
44 79
XX XXX XX
X
X
X
X XX
X
X
X
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
EV ONLYEV ONLY EV ONLYEV ONLY
HB
HB
HB
HB
HB
(62)
(63)
(63)
(64)
(64)
(64)
(65)
(64)
(64)
(63)
(65)
(64)
(65)
(64)
(65)
(65)
(65)
(64)(63)(61)
(60)(59)
(61)
(60)
(61)
(64)
(63)
(63)
(64)
(64)
(64)
(66)
(65)
(65)
(66)
(66)
(65)
(65)
(64)
(62)
(63)
(64)
(64)
(64)
(65)
(65)
(65)
(64)
(66)
(64)
(65)
(63)
(66)
VAN
ACCESS
VAN
ACCESSEV
EV
VAN
ACCESS
VAN
ACCESSEV
EV
TT
RGA
OfficennofnnArchitecturalnnDesignn
15231nAltonnParkway,nSuiten100n
Irvine,nCAnn92618n
Tn949-341-0920n
FXn949-341-0922
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A1-2P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A1-2P
22065.00
FIRE ACCESS PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
2ND SUBMITTAL8/1/24
8'H GATE
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
26'
26' 26'
26'
40'
67'
45'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
8'H GATE
8'H GATE
8'H GATE
SCALE: 1" = 50'-0" 0' 10' 20' 100'50'
35'
35'
1 9 0 TH S T R E E T
V A N N E S S A V E N U E
1 9 5 TH S T R E E T
8'H GATE
35'
35'
35'35'
26'
26'
26'
26'
45 80
4' 5'
4'-0" 34'-0" 32'-0" 5'-6" 50'-0" 78'-0" 74'-0" 78'-0" 50'-0" 5'-6" 32'-0" 34'-0" 4'-0" 5'4'
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A2-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A2-1P
22065.00
BUILDING 1 FLOOR PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
210rProgress,rSuiter220r
Irvine,rCArr92618r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
OFFICE
AREA +
3,750 SF
MEZZANINE
OFFICE
AREA +
3,750 SF
MEZZANINE
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
16 DOCK POSITIONS
ELEC ROOM
RAMP UP
RAMP UP
481'-0"
274'-0"
89'-0" 280'-0" 83'-0" 24'-0" 3' 2'-0"
3'-0" 24'-0" 47'-6" 78'-0" 47'-6" 6'-0" 32'-0" 27'-0"
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
481'-0"
274'-0"
27'-0"32'-0"6'-0"200'-0"
46 81
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A2-2P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A2-2P
22065.00
BUILDING 2 FLOOR PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
210rProgress,rSuiter220r
Irvine,rCArr92618r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
ELEC ROOM
RAMP UP
RAMP UP
28 DOCK POSITIONS
OFFICE
AREA +
3,750 SF
MEZZANINE
OFFICE
AREA +
3,750 SF
MEZZANINE
648'-0"
2'-0" 3' 24'-0" 85'-0" 448'-0" 86'-0"
274'-0"
3'-0"
24'-0" 48'-0" 78'-0" 48'-0" 6'-0" 32'-0" 27'-0" 4'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
648'-0"
2'-0" 5'-0" 34'-0" 32'-0" 6'-0" 50'-0" 78'-0" 79'-0" 78'-0" 79'-0" 78'-0" 51'-0" 6'-0" 32'-0" 34'-1" 4'-0" 274'-0"
4'27'-0"32'-0"6'-0"200'-0" 5'
4'
47 82
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A3-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A3-1P
22065.00
BUILDING 1 ELEVATIONS
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
210rProgress,rSuiter220r
Irvine,rCArr92618r
Tr949-341-0920r
FXr949-341-0922
OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
PREPARED BY:
PAINTED ROOF
DOWNSPOUT
TYP.
PAINTED DOCK DOORPAINTED GRADE
RAMP DOOR
OFFICE
ENTRANCE
45'-0"
43'-0"
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
43'-0"
41'-0"
43'-0"
41'-0"
45'-0"
41'-0"
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
OFFICE
ENTRANCE
NOTES:
1. ALL ROOFTOP MECH. EQUIPMENT SHALL BE SCREENED
FROM VIEW.
1. FIELD COLOR
SW 7636 - ORIGAMI WHITE
2. LIGHT ACCENT COLOR
SW 6002 - ESSENTIAL GRAY
3. RIBBED CONCRETE PANEL
ACCENT COLOR
SW 2819 - DOWNING SLATE
4. ACCENT COLOR
SW 2819 - DOWNING SLATE
5. RIBBED CONCRETE PANEL
DARK ACCENT COLOR
SW 7069 - IRON ORE
6. CANOPIES: ALUCOBOND:
CLEAR ANODIZED
7. GLAZING: PPG SOLARCOOL PACIFICA
CLEAR ANODIZED STOREFRONT
FINISH SCHEDULE:
LIGHT FIXTURE STYLE:
48 83
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A3-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A3-1P
22065.00
BUILDING 2 ELEVATIONS
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
210rProgress,rSuiter220r
Irvine,rCArr92618r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
NOTES:
1. ALL ROOFTOP MECH. EQUIPMENT SHALL BE SCREENED
FROM VIEW.
LIGHT FIXTURE STYLE:
PAINTED ROOF
DOWNSPOUT
TYP.
OFFICE
ENTRANCE
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
45'-0"
43'-0"
OFFICE
ENTRANCE
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
41'-0"
45'-0"
43'-0"
41'-0"
43'-0"
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
41'-0"
45'-0"
1. FIELD COLOR
SW 7636 - ORIGAMI WHITE
2. LIGHT ACCENT COLOR
SW 6002 - ESSENTIAL GRAY
3. RIBBED CONCRETE PANEL
ACCENT COLOR
SW 2819 - DOWNING SLATE
4. ACCENT COLOR
SW 2819 - DOWNING SLATE
5. RIBBED CONCRETE PANEL
DARK ACCENT COLOR
SW 7069 - IRON ORE
6. CANOPIES: ALUCOBOND:
CLEAR ANODIZED
7. GLAZING: PPG SOLARCOOL PACIFICA
CLEAR ANODIZED STOREFRONT
FINISH SCHEDULE:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
41'-0"
49 84
REVISED PLANNING COMMISSION RESOLUTION NO. 25-033
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING A
CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
120,466 SQUARE FOOT INDUSTRIAL WAREHOUSE
BUILDING ON PROPERTY LOCATED IN THE HEAVY
MANUFACTURING ZONE AT 2160 W. 190TH STREET.
CUP24-00012: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA), and for approval of a Conditional Use Permit (CUP24-00012) to allow the construction of a 120,466 square foot industrial warehouse building in conjunction with a Division of Lot (DIV24-00004) to consolidate three existing parcels into two parcels on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1,Article 41 of the Torrance Municipal Code (TMC); and WHEREAS, based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the Sequoia Commerce Center Project; and WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001,7352-016-002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described u*TR=PARTOFTHE RANCHO SAN PEDROALLOTIED TO MANUEL DOMINGUEZ*LOTCOMWON S LINEOF 190THST2038.47 FT FROMW LINE OFWESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FTTH N ON
E LINE OF VAN NESS AVE AND E ON SO S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT" as per map recorded in the Office of the Los Angeles County Recorder, State of California;
c) That the subject parcel (APN 7352-016-002) is described as u*TR=PARCELMAPAS PER BK 67 PG3OF PMLOT1"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as u*TR=PARCELMAPAS PER BK 67 PG3OFPMLOT2"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration (IS/MND) in accordance ------------------------------ - ------
85 ATTACHMENT 5
with the CEQA. The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore an MND was adopted; f) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the Torrance Municipal Code and is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance; g) That the project, as conditioned, will not impair the integrity and character of the M-2 Zone because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the south and east, and the petroleum refinery to the west; h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration; i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west;
j) That the project, as conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the I-BP land use designation, which is characterized by manufacturing industries which process raw or extracted substances, or which use hazardous materials. Permitted uses include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products;
k) That the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal through modulation of building masses, elevations, and rooflines that promote visual interest; I) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by all necessary utilities and public services. In addition, the project applicant is required to pay development impact fees to offset the incremental increase in the demand for public services; m) That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded bythree streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minimum requirement for onsite parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n) That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has been thoroughly reviewed and found to be in compliance with the objective development standards of the M-2 Zone and is consistent with the I-BP land use designation;
86 0) That the project, as conditioned, will not produce any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character oftraffic orthe congregating of large numbers of people or vehicles; and
WHEREAS, the Planning Commission by the following roll call vote APPROVED CUP24- 00012, subject to conditions:
AYES: COMMISSIONERS: ANUNSON, BORGIALLI, OBEJAS, RIGGS, TURNER, YEH,
CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that CUP24-00012 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) to allow the construction of a 120,466 square foot industrial warehouse building on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project, on file inthe Community Development Department ofthe City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP24-00012; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if CUP is not used within one year after granting ofthe permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, oremployees to attack, set aside, void, orannul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval. The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of this Conditional Use Permit or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Added by Planning Commission)
4. That a copy of Planning Commission Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction 87 specifications, and bid documents associated with the project to facilitate coordination and effective implementation ofthe conditions of approval and the mitigation measures; (Planning)
5. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
6. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
7. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas; (Planning)
8. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
9. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
10.That no truck terminal, truck stop, or similar operation shall be permitted on-site; (Planning)
11.That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
12.That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
13.That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
14.That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
15.That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
16.That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
17.That all windows/glazing below an elevation of 10feet shall be provided with a protective film or other technology to prevent graffiti. In addition, protective film or equivalent anti-graffiti measures shall be applied to all corner office entryways; (Planning)
18.That any future request for a Wireless Antenna Facility shall require separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
19.That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the California Environmental Quality Act (CEQA), and such use is reviewed and approved by the Community Development Department; (Planning)
88 20. That the total floor area devoted to manufacturing shall not exceed 69,000 square feet. Any future expansion of floor area beyond this limit shall require prior review and approval by the Community Development Department to assess compliance with parking requirements; (Planning)
21. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
22. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integral part of the facade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
23. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street. The applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
24. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project site perimeter prior to the issuance of grading permits to the satisfaction of the Community Development Director; (Planning)
25. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved bythe Community Development Director. The perimeter fencing and decorative wrap shall be installed prior to the issuance of grading permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
26. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGC) and shall ensure that all parking areas and pathways are provided with adequate illumination, security lights that are non-glaring, and that all building lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line shall not exceed 1 foot candle. Light fixtures inthe uncovered parking area shall not exceed 15feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
27. That a roof plan shall be included with the building plan set for review prior to permit issuance.
The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such a manner that noise emanating from the roof appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
28. That asite plan shall be submitted with the building plan set for review prior to permit issuance.
The site plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel, meter, backflow preventer, 89 double detector check assembly, fire riser, etc. Screening shall comply with all utility company and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
29. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Van Ness Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the latest State Water Efficient Landscape Ordinance; (Planning)
30. That all trees planted within the project site shall not be less than 24-inch box in size, and that all shrubs not be less than 1gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; (Planning)
31. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satisfaction of the Community Development Director; (Planning)
32. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at intervals of one tree for every four spaces along the eastern row of parking stalls, consistent with minimum tree spacing requirements. The placement and spacing of tree diamonds shall be designed to avoid conflicts with existing trees located on the adjacent eastern parcel, to the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
33. That the applicant shall demonstrate compliance with the City's Transportation Demand Management (TOM) Ordinance on the submitted plans at the time of Building and Safety plan check review; (Transportation Planning)
34. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits. The plan shall include, but not be limited to, stop controls, pedestrian and vehicular signage, striping, wayfinding elements, and clearly delineated pedestrian pathways throughout the site.
Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop signs, yield signs, and directional signage, as no such features are currently depicted on the submitted plans. The applicant shall also consider the implementation of right-turn-only movements at the eastern driveway along 190th Street and at the driveways along Van Ness Avenue, given the proximity of the signalized intersection at 195th Street; (Transportation Planning)
35. That the project shall comply with current Green Code's Tier 1 Requirements; (Building and Safety)
- --- -----
90 36. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction ofthe Building Official; (Building and Safety)
37. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed buildings; (Environmental)
38. That the applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division; (EnvironmentallTransportation Planning)
39. That the applicant shall install rooftop numbers in order to assist law enforcement and other emergency personnel locate the property. The numbers should be4' high and 2'wide, spaced 12 inches apart, be parallel to the street and be a non-reflective color that contrasts the color of the roof; (Environmental/Police)
40. That the applicant shall verify whether a Master Sign Program is on file for the property. If no such program exists, the applicant shall prepare and submit a new Master Sign Program in compliance with TMC 911.5.020, including a 1-2-page summary outlining the proposed signage standards and guidelines; (Environmental)
41. That the applicant shall ensure that all signage-including new, modified, or revised signs is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file; (Environmental)
42. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current NPDES (National Pollutant Discharge Elimination System) requirements and shall be submitted as part of the building plan check submittal; (Environmental/Planning)
43. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
44. That all connections for water service shall be made to the stub outs provided (unless stub outs are undersized). Ifexisting stub outs are not used, they shall be abandoned at the main; (Water)
45. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right-of-way and shall be screened from public view with approved plant material. Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT ISSUANCE. Landscape screening shall provide access to water and fire department at all times and be maintained diligently to the satisfaction of the Fire Marshal; (Water)
46. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (Water)
.47. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310-660-6208 for assistance developing plans and coordinating with California Department of Health Services; (Water)
48. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes. The back of walk shall line up with the property line along Van Ness Avenue and 195th Street. See City of Torrance standard T114; (Engineering)
91 49. That the applicant/developer shall design and construct a private storm drain system to public standards. The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Private storm drain to be constructed prior to occupancy; (Engineering)
50. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
51. That a hydrology study shall be submitted to and approved by the Community Development Department, Engineering Division prior to approval of the grading plan. The study shall include method of detaining the difference between the 1O-yearand 50-year storm. Determine proposed building finished floor elevation with adequate freeboard; (Engineering)
52. That separate sewer laterals shall be provided for each building to the public sewer mainline.
The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the building permit. The existing sewer lateral shall be replaced if damage is found; (Engineering)
53. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
54. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
55. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on-site fire hydrants are installed; (Engineering)
56. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
57. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3-port fire hydrants with break-off check valves; (Engineering)
58. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
59. The applicant shall install non-glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
60. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
61. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans. The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standards to allow selective or universal access to live camera feeds by law enforcement in the event of an active crime or emergency situation; (Police)
62. The applicant shall remove and replace all existing Ficus trees located within the parkway.
Street trees shall be planted in every existing vacant tree well within the parkway. All vegetation within the parkway shall not exceed 18 inches in height and shall be free of thorns; and (Streetscape)
--- .-------- ---
92 63. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, and adopted this 7th day of May 2025.
anning Commission
~
::;:::::::==-
C~C ..arrperson, orrance annrng ornrrussron
93 STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted bythe Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 7th day of May 2025, by the following roll call vote:
AYES: COMMISSIONERS:
ANUNSON, BORGIALLI, OBEJAS, RIGGS,
TURNER, YEH, CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
Secretary, Torrance Planning Commission
94 REVISED PLANNING COMMISSION RESOLUTION NO. 25-034
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING A
CONDITIONAL USE PERMIT AS PROVIDED FOR IN
DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A
155,834 SQUARE FOOT INDUSTRIAL WAREHOUSE
BUILDING ON PROPERTY LOCATED IN THE HEAVY
MANUFACTURING ZONE AT 2160 W. 190TH STREET.
CUP24-00013: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7, 2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA), and for approval of a Conditional Use Permit (CUP24-00013) to allow the construction of a 155,834 square foot industrial warehouse building in conjunction with a Division of Lot (DIV24-00004) to consolidate three existing parcels into two parcels on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1,Article 41 of the Torrance Municipal Code (TMC); and WHEREAS, based on all the evidence found and public testimony considered the Planning Commission of the City of Torrance by roll call vote approved a motion to adopt a Mitigated Negative Declaration for the Sequoia Commerce Center Project; and WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001,7352-016-002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described "*TR=PART OFTHE RANCHO SAN PEDROALLOTTED TO MANUEL DOMINGUEZ*LOT COMWON S LINEOF 190THST2038.47 FT FROMW LINE OFWESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FTTH N ON
E LINE OF VAN NESS AVE AND E ON SO S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT" as per map recorded in the Office of the Los Angeles County Recorder, State of California;
c) That the subject parcel (APN 7352-016-002) is described as "*TR=PARCEL MAPAS PER BK 67 PG3OFPMLOT 1"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as "*TR=PARCEL MAPAS PER BK 67 PG3OFPMLOT2"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration (IS/MND) in accordance - --- ----~
95 with the CEQA. The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore an MND was adopted; f) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the Torrance Municipal Code and is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance; g) That the project, as conditioned, will not impair the integrity and character of the M-2 Zone because the project is compatible with the surrounding industrial and commercial uses that include industrial buildings to the south and east, and the petroleum refinery to the west; h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration; i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west;
j) That the project, as conditioned, will encourage and be consistent with the orderly development of the City as provided for in the General Plan because the project is located within the I-BP land use designation, which ischaracterized by manufacturing industries which process raw or extracted substances, or which use hazardous materials. Permitted uses include traditional industrial processes such as manufacturing, processing, warehousing, packaging or treatment of products;
k) That the project, as conditioned, will not discourage the appropriate existing or planned future use of surrounding property and tenancies because the project represents an improvement to the area. For example, the project architecture demonstrates appeal through modulation of building masses, elevations, and rooflines that promote visual interest; I) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure the project is not detrimental to public health and safety because the project site is situated within an urbanized environment and is already served by all necessary utilities and public services. In addition, the project applicant is required to pay development impact fees to offset the incremental increase in the demand for public services; m) That there will be adequate provisions for public access to serve the project, as conditioned, because the project site is bounded bythree streets, thus allowing fire truck access throughout the project site, and parking provided on site exceeds the minimum requirement for onsite parking, ensuring sufficient circulation and accessibility for tenants, visitors, and emergency services;
n) That the location, size, design, and operating characteristics of the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons located in the area because the project has been thoroughly reviewed and found to be in compliance with the objective development standards of the M-2 Zone and is consistent with the I-BP land use designation;
96 0) That the project, as conditioned, will not produce any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character oftraffic or the congregating of large numbers of people or vehicles; and
WHEREAS, the Planning Commission, by the following roll call vote APPROVED CUP24- 00013, subject to conditions:
AYES: COMMISSIONERS: ANUNSON, BORGlALLI, OBEJAS, RIGGS, TURNER, YEH,
CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that CUP24-00013 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) to allow the construction of a 155,834 square foot industrial warehouse building on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use of the subject property shall be subject to all conditions imposed in CUP24-00013; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the Torrance Municipal Code on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if Conditional Use Permit is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, orannul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval. The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of this Conditional Use Permit or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Added by Planning Commission)
4. That a copy of Planning Commission Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation ofthe conditions of approval and the mitigation measures; (Planning) 97 5. That a copy of the MMRP with wet blue ink signature of the property owner or legal agent shall be submitted to the Community Development Department for recordkeeping prior to issuance of the grading permit; (Planning)
6. That all mitigation measures and regulatory compliance measures identified in the MMRP shall be adhered to and implemented during the compliance period; (Planning)
7. That all loading and unloading shall be performed within the buildings, directly into trucks parked at approved loading dock areas; (Planning)
8. That all trucks and shipping containers shall be stored within the designated truck courts and limited to the approved loading bays; (Planning)
9. That no stacking of shipping containers or similar storage containers shall be permitted onsite; (Planning)
10.That no truck terminal, truck stop, or similar operation shall be permitted on-site; (Planning)
11.That no truck rental, truck repair or maintenance operation, or similar use shall be permitted; (Planning)
12.That truck parking shall only be permitted in the designated 4 loading docks. No shipping/cargo containers shall be stored within the designated passenger vehicle parking spaces or on the street; (Planning)
13.That all materials including but not limited to, product inventories, cargo, pallets, and loading equipment shall be stored inside the building and shall not be stored within the parking lot areas, loading docks of outside of the building; (Planning)
14.That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
15.That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
16.That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any building permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view by parapet walls, designed as an integral part of the facade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
17.That all windows/glazing below an elevation of 10feet shall be provided with a protective film or other technology to prevent graffiti. In addition, protective film or equivalent anti-graffiti measures shall be applied to all corner office entryways; (Planning)
18.That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
19.That the warehouse shall not be used for cold storage purposes unless and until additional environmental review is conducted pursuant to the California Environmental Quality Act (CEQA), and such use is reviewed and approved by the Community Development Department; (Planning)
20. That the total floor area devoted to manufacturing shall not exceed 95,000 square feet. Any future expansion of floor area beyond this limit shall require prior review and approval by the 98 Community Development Department to assess compliance with parking requirements; (Planning)
21. That no fuel facilities, other than propane tanks, shall be permitted, and that the location of such tanks shall not be visible from 190th Street, 195th Street and Van Ness Avenue; (Planning)
22. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/wails for this equipment shall be designed as an integral part of the facade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
23. That electrical transformers shall not be located within the front setback areas along Van Ness Avenue and within the side yard setback areas along 190th Street and 195th Street. The applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the main building facades and/or vegetation to the satisfaction of the Community Development Director, (Planning)
24. That during all construction activities a telephone number shall be available for receiving complaints and general inquiries relating to the construction of the project. The telephone number shall be posted in two conspicuous locations along the project site perimeter prior to the issuance of grading permits to the satisfaction of the Community Development Director; (Planning)
25. That during all construction activities the project site shall be secured with perimeter fencing and screened with a decorative wrap approved bythe Community Development Director. The perimeter fencing and decorative wrap shall be installed prior to the issuance of grading permits and maintained in good condition to the satisfaction of the Community Development Director; (Planning)
26. That an exterior photometric lighting plan shall be submitted with the building plan set for review prior to permit issuance. The lighting plan shall be prepared in compliance with the California Green Code (CGG) and shall ensure that all parking areas and pathways are provided with adequate illumination, security lights that are non-glaring, and that all building lights are properly shaded and reflected to prevent excess lighting onto adjacent uses and public streets. Lighting values at property line shall not exceed 1 foot candle. Light fixtures in the uncovered parking area shall not exceed 15feet in height and shall be positioned in line with the parking striping so as not to prevent vehicle overhang or obstruction; (Planning)
27. That a roof plan shall be included with the building plan set for review prior to permit issuance.
The roof plan shall identify the parapet heights and setbacks to ensure that all roof appurtenances, such as ducts and vents, all mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and all other equipment on the roof are completely screened from public view. Equipment screening shall be compatible with the building exterior finish and color and shall be constructed in such a manner that noise emanating from the roof appurtenances is not audible beyond the property line or from adjacent properties; (Planning)
28. That asite plan shall be submitted with the building plan set for review prior to permit issuance.
The site plan shall identify the placement, design, and screening of all utility and related equipment, including but not limited to any transformer, panel, meter, backflow preventer, double detector check assembly, fire riser, etc. Screening shall comply with all utility company 99 and emergency access requirements to the satisfaction of the Community Development Director; (Planning)
29. That a landscape plan shall be submitted to the Community Development Department for approval, prior to the issuance of any Building Permits associated with the subject project.
The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Van Ness Avenue, 190th street and 195th street and shall be implemented prior to occupancy, and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the latest State Water Efficient Landscape Ordinance; (Planning)
30. That all trees planted within the project site shall not be less than 24-inch box in size, and that all shrubs not be less than 1gallon in size, with the placement, and quantity of all plantings to the satisfaction of the Community Development Director; (Planning)
31. That a digital sample of the exterior building materials, finishes, and color shall be submitted with the building plan set for review prior to permit issuance. The exterior building materials, finishes, and color shall have a cohesive design to the satisfaction of the Community Development Director; (Planning)
32. That the applicant shall revise the landscape plan and site plan to incorporate tree diamonds at intervals ofone tree for every four spaces along the eastern row of parking stalls, consistent with minimum tree spacing requirements. The placement and spacing of tree diamonds shall be designed to avoid conflicts with existing trees located on the adjacent eastern parcel, to the satisfaction of the Community Development Director prior to the issuance of building permits; (Planning)
33. That the applicant shall demonstrate compliance with the City's Transportation Demand Management (TDM) Ordinance on the submitted plans at the time of Building and Safety plan check review; (Transportation Planning)
34. That the applicant shall submit a sitewide signing and striping plan, to the satisfaction of the Community Development Department, prior to the issuance of building permits. The plan shall include, but not be limited to, stop controls, pedestrian and vehicular signage, striping, wayfinding elements, and clearly delineated pedestrian pathways throughout the site.
Additionally, the plan shall demonstrate how the main entrance and exit along Van Ness Avenue will be controlled, including the placement of stop signs, yield signs, and directional signage, as no such features are currently depicted on the submitted plans. The applicant shall also consider the implementation of right-turn-only movements at the eastern driveway along 190th Street and at the driveways along Van Ness Avenue, given the proximity of the signalized intersection at 195th Street; (Transportation Planning)
35. That the project shall comply with current Green Code's Tier 1 Requirements; (Building and Safety)
100
36. That upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that the project is in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction ofthe Building Official; (Building and Safety)
37. That the applicant shall provide 9" (minimum) contrasting address numerals for the proposed buildings; (Environmental)
38. That the applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail to the satisfaction of Environmental Division; (EnvironmentalfTransportation Planning)
39. That the applicant shall install rooftop numbers in order to assist law enforcement and other emergency personnel locate the property. The numbers should be4' high and 2'wide, spaced 12 inches apart, be parallel to the street and be a non-reflective color that contrasts the color of the roof; (Environmental/Police)
40. That the applicant shall verify whether a Master Sign Program is on file for the property. If no such program exists, the applicant shall prepare and submit a new Master Sign Program, including a 1-2-page summary outlining the proposed signage standards and guidelines; (Environmental)
41. That the applicant shall ensure that all signage-including new, modified, or revised signs is reviewed and approved by the Environmental Division, with appeal rights to the Planning Commission, or shall comply with an approved Master Sign Program on file; (Environmental)
42. That the applicant shall construct the trash enclosure with a metal barrier roof covering to prevent rainwater intrusion, in compliance with current NPDES (National Pollutant Discharge Elimination System) requirements and shall be submitted as part of the building plan check submittal; (Environmental/Planning)
43. That the applicant shall provide appropriate bins or containers within the trash enclosure for the separation, storage, and retrieval of refuse and recyclable materials; (Environmental)
44. That all connections for water service shall be made to the stub outs provided (unless stub outs are undersized). Ifexisting stub outs are not used, they shall be abandoned at the main; (Water)
45. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduced pressure backflow assemblies shall be located above ground on private property near the public right-of-way and shall be screened from public view with approved plant material. Final location of said facilities and landscape screening shall be incorporated into water, fire and landscape plan for review prior to BUILDING PERMIT ISSUANCE. Landscape screening shall provide access to water and fire department at all times and be maintained diligently to the satisfaction of the Fire Marshal; (Water)
46. That the applicant shall perform fire hydrant flow test that determines the capability of the public water system to supply the project; (Water)
47. That the project site landscaping shall be irrigated with recycled water. Please contact West Basin Municipal Water District, the producer and permit holder for recycled water distribution use in this area, at 310-660-6208 for assistance developing plans and coordinating with California Department of Health Services; (Water)
48. That portion of the southwest corner of the proposed Parcel 2 shall be dedicated to the City of Torrance for street and highway purposes. The back of walk shall line up with the property line along Van Ness Avenue and 195th Street. See City of Torrance standard T114; (Engineering)
101
49. That the applicant/developer shall design and construct a private storm drain system to public standards. The storm drain plans prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Private storm drain to be constructed prior to occupancy; (Engineering)
50. That proposed driveways on 190th St., Van Ness Ave., and 195th St. shall be constructed to a commercial radius type driveways minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
51. That a hydrology study shall be submitted to and approved by the Community Development Department, Engineering Division prior to approval of the grading plan. The study shall include method of detaining the difference between the 1O-yearand 50-year storm. Determine proposed building finished floor elevation with adequate freeboard; (Engineering)
52. That separate sewer laterals shall be provided for each building to the public sewer mainline.
The existing sewer lateral shall be videoed and video submitted to the Engineering Division of the Community Development Department prior to the issuance of the building permit. The existing sewer lateral shall be replaced if damage is found; (Engineering)
53. That the applicant shall submit a sewer study discussing the new development's impact on the public sewer system. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
54. That the applicant shall contact the City of Torrance Fire Department to determine fire suppression requirements; (Engineering)
55. That a fire meter and double check valve assembly shall be installed at each fire service connection to the public main, if on-site fire hydrants are installed; (Engineering)
56. That all domestic services shall be protected by a reduced pressure principle assembly; (Engineering)
57. That the existing fire hydrant on 190th St. and the existing fire hydrant at the southeast corner of 190th St. and Van Ness Ave. shall be upgraded to 3-port fire hydrants with break-off check valves; (Engineering)
58. The applicant shall ensure that the business name and address are clearly visible from the street; (Police)
59. The applicant shall install non-glare security lighting throughout the parking lot to enhance visibility and safety; (Police)
60. The applicant shall secure all gates on the property with a Knox Box lock system that provides access to both the Police and Fire Departments; (Police)
61. The applicant shall install all entry and exit points, loading docks, and parking areas as shown on the approved plans. The Police Department recommends that video surveillance systems be compatible with Open Network Video Interface Forum (ONVIF) standards to allow selective or universal access to live camera feeds by law enforcement in the event of an active crime or emergency situation; (Police)
62. The applicant shall remove and replace all existing Ficus trees located within the parkway.
Street trees shall be planted in every existing vacant tree well within the parkway. All vegetation within the parkway shall not exceed 18inches in height and shall be free of thorns; and (Streetscape)
102
63. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, and adopted this 7th day of May 2025.
~cairperson, orrance annmq ornrmssion
Secretary, Torrance Planning Commission
103
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted bythe Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 7th day of May 2025, by the following roll call vote:
AYES: COMMISSIONERS:
ANUNSON, BORGIALLI, OBEJAS, RIGGS,
TURNER, YEH, CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
104
PLANNING COMMISSION RESOLUTION NO. 25-035
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA APPROVING A
DIVISION OF LOT AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE FOR LOT CONSOLIDATION PURPOSES ON
PROPERTY LOCATED IN THE HEAVY MANUFACTURING
ZONE AT 2160 W. 190TH STREET.
DIV24-00004: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7,2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for approval of a Division of Lot (DIV24-00004) consolidate three existing parcels into two parcels on property located in the Heavy Manufacturing (M-2) Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1,Article 41 of the Torrance Municipal Code (TMC); and WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located at 2160 W. 190th Street (APNs 7352-016-001,7352-016-002, and 7352-016-003);
b) That the subject parcel (APN 7352-016-001) is described u*TR=PARTOFTHE RANCHO SAN PEDROALLOTTED TO MANUELDOMINGUEZ*LOT COMWON S LINEOF 190THST2038.47 FT FROMW LINE OF WESTERN AVE (PER C S 8192) TH S 638.5 FT TH W 426 FTTH N ON
E LINE OF VAN NESS AVE AND E ON SD S LINE TO BEG POR OF MARIE DE LOS REYES DOMINGUEZ 638.94 ACS ALLOT" as per map recorded in the Office of the Los Angeles County Recorder, State of California;
c) That the subject parcel (APN 7352-016-002) is described as u*TR=PARCELMAPAS PER BK 67 PG3OFPMLOT1"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
d) That the subject parcel (APN 7352-016-003) is described as u*TR=PARCELMAPAS PER BK 67 PG3OF PMLOT2"as per map recorded inthe Office ofthe LosAngeles County Recorder, State of California;
e) That the project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, as the environmental impacts associated with the project have been assessed through an Initial Study/Mitigated Negative Declaration in accordance with the California Environmental Quality Act (CEQA). The project would not have a significant effect on the environment when mitigation measures are incorporated and therefore a Mitigated Negative Declaration was adopted;
f) That the proposed Division of Lot, together with provision for its design and improvement, is consistent with the Business Park (I-BP) land use designation of the General Plan of the City of Torrance;
105
g) That the project is conditionally permitted within the M-2 Zone and complies with the objective development standards of the TMC and is consistent with the I-BP land use designation of the General Plan of the City of Torrance;
h) That the project site is physically suitable for the project, as conditioned, because the project site is situated within an urbanized environment and already served by all necessary utilities and public services, and because the relatively flat topography and existing access to public right-of-way support the proposed development without requiring substantial site alteration; i) That the project, as conditioned, will be compatible with existing and proposed future land uses within the M-2 Zone and the general area in which the project is to be located because the project site is surrounded by urban uses that include industrial buildings to the south and east, and the petroleum refinery to the west;
j) That the subdivision for consolidation purposes will not interfere with the orderly development of the City and will incorporate a high quality design; k) That the design of the development and subdivision will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat as potential environmental impacts have been analyzed in accordance with the CEQA. An Initial Study (IS) was prepared, and it was determined that the project, with incorporation of mitigation measures, will not have a significant effect on the environment. A Mitigated Negative Declaration (MND) has been prepared and circulated in accordance with CEQA Guidelines; I) That the project, as conditioned, will not produced any or all of the following results:
• Damage and nuisance from noise, smoke odor, dust or vibration, • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
m) That the design of the development and subdivision will not conflict with any public access or easements as all means of public access are being improved along 190th Street, Van Ness WHEREAS, the Planning Commission by the following roll call vote APPROVED DIV24- 00004, subject to conditions:
AYES: COMMISSIONERS: ANUNSON, BORGIALLI, OBEJAS, RIGGS, TURNER, YEH,
CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that DIV24-00004 filed by RREEF AMERICA, LLC (IPERS Sequoia Commerce Center) for approval of a DIV24-00004 consolidate three existing parcels into two parcels on property located in the M-2 Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That use ofthe subject property shall be subject to all conditions imposed in DIV 24-00004; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, ----------------------------------------------------------- --- - 106
specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DIV 24-00004 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That a copy of Planning Commission Resolutions and the Mitigation Monitoring and Reporting Program (MMRP) shall appear on all grading plans, building plans, construction specifications, and bid documents associated with the project to facilitate coordination and effective implementation of the conditions of approval and the mitigation measures; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department; and (Engineering)
5. That all conditions of all other City departments received prior to or during the consideration of the project by the Planning Commission shall be met.
Introduced, and adopted this 7th day of May 2025.
~---
c~ ..arrperson, orrance anrunq ornrrussron
107
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted bythe Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 7th day of May 2025, by the following roll call vote:
AYES: COMMISSIONERS:
ANUNSON, BORGIALLI, OBEJAS, RIGGS,
TURNER, YEH, CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
108
PLANNING COMMISSION RESOLUTION NO. 25-036
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA ADOPTING A
MITIGATED NEGATIVE DECLARATION FOR THE SEQUOIA
COMMERCE CENTER PROJECT IN ACCORDANCE WITH
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT.
EAS24-00001: RREEF AMERICA, LLC (IPERS SEQUOIA COMMERCE CENTER) WHEREAS, the Planning Commission of the City of Torrance conducted a duly noticed public hearing on May 7,2025 to consider an application filed by RREEF America, LLC (IPERS Sequoia Commerce Center) for adoption of a Mitigated Negative Declaration (MND) in accordance with the California Environmental Quality Act (CEQA) on property located in the Heavy Manufacturing (M-2) Zone at 2160 West 190th Street, referred to as the Sequoia Commerce Center Project; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1,Article 41 of the Torrance Municipal Code; and WHEREAS, pursuant to the CEQA, (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.), as amended, the City of Torrance is the Lead Agency responsible for preparation and consideration of the environmental review for the 2160 W. 190th Street Industrial Warehouse Project; and WHEREAS, an Initial Study (IS) was prepared to assess the potential environmental impacts associated with the 2160 W. 190th Street Industrial Warehouse Project, and said IS concluded that the project may result in or cause potentially significant effects. However, compliance with existing policies, plans and regulations, revisions to the plans, together with design features and mitigation measures incorporated would avoid the effects or mitigate the effects to levels that would be less than significant. Therefore, the City of Torrance has determined a MND is appropriate and that no further environmental review is required; and WHEREAS, notices of the Initial Study/Mitigated Negative Declaration (IS/MND) and its availability for review and comment were filed and circulated for a thirty (30) calendar day period commencing on March 6, 2025, and ending on April 7, 2025; and WHEREAS, during the review and comment period, affected public agencies and any interested parties were able to comment on the adequacy of the IS/MND in identifying and analyzing the potential environmental impacts associated with the 2160 W. 190th Street Industrial Warehouse Project and the ways in which potentially significant effects can be avoided or mitigated; and
WHEREAS, comment letters were received from private parties and public agencies related to the IS/MND prepared for the 2160 W. 190th Street Industrial Warehouse Project, and have been thoroughly reviewed to determine whether any new substantial environmental issues have been raised; and
WHEREAS, although CEQA does not require a formal response to each of the comments received on the IS/MND, a Response to Comments has nonetheless been prepared in order to provide the decision-making body with additional information upon which to base their decision; and
109
WHEREAS, based on the evaluation in the IS/MND together with all comments received, no new substantial environmental issues have been raised and that all issued raised in the comment letters have been adequately addressed in the IS/MND and in the Response to Comments. All potential impacts associated with the 2160 W. 190th Street Industrial Warehouse Project were found to be less than significant with incorporation of relevant mitigation measures, where applicable. Therefore, the findings and conclusions of the IS/MND are not affected, and no revisions are required or proposed; and
WHEREAS, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared that list all of the Mitigation Measures (MMs), specifies the appropriate responsible party for implementing each mitigation measure, and identifies approximate time frames for implementing of each mitigation measure; and
WHEREAS, the IS/MND and MMRP and all documents and records relating to the 2160 W. 190th Street Industrial Warehouse Project are on file and available for review with the Community Development Department ofthe City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA 90503; and
NOW, THEREFORE, BE IT RESOLVED the Planning Commission of the City ofTorrance hereby finds and determines as follows:
a) That the IS/MND was properly prepared and circulated for public review in accordance with the CEQA;
b) That the IS/MND was carefully considered and all comments thereon, and is the appropriate environmental document for the project, and reflects the independent judgment and analysis of the City of Torrance as the Lead Agency, and that no further environmental review is required;
c) That with implementation of the mitigation measures identified in the IS/MND and included in and enforced by the MMRP, and on the basis of the whole record and public testimony considered, there is no substantial evidence that the project will have a significant effect on the environment;
d) That the MND is hereby adopted; and
e) That the IS/MND and MMRP and the documents and records relating to the project are on file with the Community Development Department of the City of Torrance, located at 3031 Torrance Boulevard, Torrance, CA 90503.
INTRODUCED, APPROVED, and ADOPTED atthe regular meeting ofthe Planning Commission of the City of Torrance held on the 7th day of May 2025 by the following roll call vote:
AYES: COMMISSIONERS: ANUNSON, BORGIALLI, OBEJAS, RIGGS, TURNER, YEH,
CHAIRMAN KARTSONIS
ommission
~mmiSSion
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
110
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, and adopted bythe Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 7th day of May 2025, by the following roll call vote:
AYES: COMMISSIONERS:
ANUNSON, BORGlALLI, OBEJAS, RIGGS,
TURNER, YEH, CHAIRMAN KARTSONIS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ning Commission
111
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 0
INDEX
TORRANCE PLANNING COMMISSION – MAY 7, 2025
SUBJECT PAGE
OPENING CEREMONIES
1. Call to Order / Roll Call 1
2. Flag Salute 1
3. Posting of the Agenda 1
4. Withdrawn, Postponed, and / or Supplemental Items 1
5. ORAL COMMUNICATIONS 1
6. CONSENT CALENDAR 1
6A. Approval of Minutes: March 19, 2025 And April 16, 2025 2
7. ADMINISTRATIVE MATTERS 2
8. HEARINGS 2
8A. MOD23-00010, MHE23-00050: JWG CONSULTING (SAUNDERS PROPERTY COMPANY) Res. Nos. 23-079, 23-080 2
8B. CUP24-00012, CUP24-00013, DIV24-00004, EAS24-00001: RREEF AMERICA (IPERS SEQUOIA COMMERCE CENTER) Res. Nos. 25-033, 25-034, 25-035, 25-036 2-4 8C. LUS24-00006: CITY OF TORRANCE (RELIGIOUS INSTITUTION HOUSING OVERLAY ZONE) 4-5
9. RESOLUTIONS 5
10. COMMISSION ORAL COMMUNICATIONS 5
11. ADJOURNMENT 5
At 8:30 p.m., Commissioner Borgialli moved to adjourn the meeting to Wednesday, May 21, 2025, at 6:30 p.m. in the LeRoy J. Jackson Council Chambers. 112
ATTACHMENT 6
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 2
May 7, 2025
MINUTES OF A REGULAR MEETING OF THE
TORRANCE PLANNING COMMISSION AGENDA
1. CALL MEETING TO ORDER
The Torrance Planning Commission convened in a regular session at 6:31 p.m. on Wednesday, May 7, 2025, in the LeRoy J. Jackson Council Chambers 3031 Torrance Boulevard Torrance, CA 90503
ROLL CALL
Present: Commissioners Anunson, Borgialli, Obejas, Riggs, Turner, Yeh, and Chair Kartsonis.
Absent: None.
Also Present: Planning Manager Robert Garcia, Senior Planner Leo Oorts, Planning Associate Natalie Niemeyer, Planning Associate Luis Velazquez, Planning Manager Oscar Martinez, Planning Associate Kevin Joe, Assistant Engineer Cheolsan Kim, Building Official Uykheang Keo, Supervising Plans Examiner Rigoberto Torres, Senior Fire Prevention Specialist Chris Rhodes, Deputy City Attorney Jennifer Guerrero, and Community Development Director Michelle Ramirez.
2. FLAG SALUTE
Chair Kartsonis led the Pledge of Allegiance.
3. REPORT OF THE COMMUNITY DEVELOPMENT STAFF ON THE POSTING OF THE AGENDA
Planning Manager Garcia stated that the agenda was posted on the Public Notice Board at 3031 Torrance Boulevard and on the City’s Website on Thursday, May 1, 2025.
4. ANNOUNCEMENT OF WITHDRAWN, DEFERRED, AND/OR SUPPLEMENTAL ITEMS Planning Manager Garcia reported a Withdrawal for Item 8A with a request that the Item be continued to Wednesday, May 21, 2025, and a Supplemental Item for Item 8B.
MOTION: Commissioner Anunson moved to continue Item 8A to a date certain of Wednesday, May 21, 2025. Commissioner Turner seconded the motion; a roll call vote reflected 7-0 approval.
5. ORAL COMMUNICATIONS
None.
113
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 3
6. CONSENT CALENDAR
6A. APPROVAL OF MINUTES: MARCH 19, 2025 AND APRIL 16, 2025 MOTION: Commissioner Yeh moved to approve the March 19, 2025 and April 16, 2025 minutes as presented. Commissioner Turner seconded the motion; a roll call vote reflected 7 -0 approval.
7. ADMINISTRATIVE MATTERS
None.
8. HEARINGS
8A. COMMUNITY DEVELOPMENT – CONDUCT A PUBLIC HEARING TO CONSIDER APPROVAL OF MOD23 -00010, MHE23 -00050: JWG CONSULTING (SAUNDERS
PROPERTY COMPANY)
Recommendation of the Community Development Director that Planning Commission conduct a public hearing and consider denial of a Modification to previously approved Division of Lot (DIV14-00006) to amend an open space easement (Note A), in conjunction with a Minor Hillside Exemption to allow ground - mounted solar panels and associated equipment, on property located within the Hillside Overlay in the P-1 Zone at 2550 Pacific Coast Highway. This project is Categorically Exempt from the California Environmental Quality Act (CEQA) per Guidelines Section 15303 – New Construction and Section 15332 – In-Fill Development. (Res. Nos. 23-079, 23-080)
Item 8A continued to Wednesday, May 21, 2025.
8B. COMMUNITY DEVELOPMENT – CONDUCT A PUBLIC HEARING TO CONSIDER APPROVAL OF CUP24 -00012, CUP24 -00013, DIV24 -00004, EAS24 -00001: RREEF
AMERICA (IPERS SEQUOIA COMMERCE CENTER)
Recommendation of the Community Development Director that Planning Commission conduct a public hearing for consideration of an Environmental Assessment for the adoption of a Mitigated Negative Declaration (MND), and approval of a Conditional Use Permit (CUP24 -00012 and CUP24 -00013) to allow the construction of two industrial buildings totaling 276,300 square feet on a 14.02 acre site, in conjunction with a Division of Lot (DIV24 -00004) to consolidate three existing parcels into two parcels on property located in the Heavy Manufacturing Zone (M-2) at 2160 West 190th Street (APNs 7352 - 016-001, 7352-016-002, and 7352-016-003). The request is referred to as the “Sequoia Commerce Center Project.” (Res. Nos. 25-033, 25-034, 25-035, 25-036) Commissioner Borgialli disclosed that he is acquainted with former Mayor Frank Scotto who is a representative for Item 8B and stated that his decisions will be made based on evidence presented without conflict.
Commissioner Riggs disclosed that he is acquainted with former Mayor Frank Scotto and will base decisions on evidence presented.
Chair Kartsonis disclosed that he is acquainted with former Mayor Frank Scotto and has no financial relationship that will be a conflict of interest and that his decisions will be made based on evidence presented and personal observations.
114
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 4
Planning Associate Velazquez presented Item 8B, stating that staff has reviewed the project and determined that development standards are met and does not pose a significant environmental impact.
Planning Associate Velazquez stated that staff recommends adopting the Mitigated Declaration and approving the project as proposed.
Ms. Nicole Morse, Principal with T&B Planning, provided a PowerPoint presentation on the Sequioa Commerce Center Redevelopment Project.
Chase Preciado with the law firm Lozeau Drury, LLP, spoke on behalf of the Supporters Alliance for Environmental Responsibility (SAFER), stating that SAFER is requesting a full environmental impact report due to concerns on air quality and hazardous materials impacts.
Commissioner Obejas inquired if there were any Conditions that have changed to prevent injury or death to cyclists, and if there were plans to stripe Van Ness Avenue with a bike lane.
Planning Manager Garcia stated that staff had communicated with the Public Works Department and that there were no plans on striping Van Ness Avenue with a bike lane.
Senior Planner Oorts stated that staff can investigate the “line of sight” during the landscape review and the site plan process to ensure that there are no obstructions.
Planning Associate Velazquez noted that staff has added a Condition to the Resolution to require the applicant to submit a landscape plan and signage plan that will be reviewed before building permit issuance.
Chair Kartsonis disclosed that he visited the site and will base decisions on evidence presented and personal observations.
Senior Planner Oorts read a Condition of Approval that was missing from the Resolution.
Ms. Morse stated that the applicant agreed to all Conditions of Approval.
MOTION: Commissioner Borgialli moved to close the public hearing. Commissioner Obejas seconded the motion; a roll call vote reflected 7-0 approval.
MOTION: Commissioner Obejas moved to approve CUP24-00012 as amended, CUP24- 00013 as amended, DIV24 -00004, and EAS24 -00001. Commissioner Turner seconded the motion; a roll call vote reflected 7-0 approval.
RESOLUTION: Planning Associate Niemeyer read the title of Resolution Number 25-033 as amended, a Resolution of the Planning Commission of the City of Torrance, California, approving a Conditional Use Permit as provided for in Division 9, Chapter 5, Article 1 of the Torrance Municipal Code to allow the construction of a 120,466 square foot industrial warehouse building on property located in the heavy manufacturing zone at 2160 West 190th Street.
RESOLUTION: Planning Associate Niemeyer read the title of Resolution Number 25-034 as amended, a Resolution of the Planning Commission of the City of Torrance, California, approving a Conditional Use Permit as provided for in Division 9, Chapter 5, Article 1 of the Torrance Municipal Code to allow the construction of a 155,834 square foot industrial warehouse building on property located in the M-2 Zone At 2160 West 190th Street.
RESOLUTION: Planning Associate Niemeyer read the title of Resolution Number 25-035, a Resolution Of the Planning Commission of the City of Torrance, California approving a Division Of Lot as provided for in Division 9, Chapter 2, Article 29 of the Torrance Municipal Code for lot consolidation purposes on property located in the heavy manufacturing zone at 2160 West 190th Street.
115
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 5
RESOLUTION: Planning Associate Niemeyer read the title of Resolution Number 25-036, a Resolution Of the Planning Commission of the City of Torrance, California approving a Mitigated Negative Declaration for the Sequoia Commerce Center Project in accordance with the California Environmental Quality Act.
MOTION: Commissioner Borgialli moved to approve Resolution Numbers 25 -033 as amended, 25-034 as amended, 25-035, and 25-036. Commissioner Obejas seconded the motion; a roll call vote reflected 7-0 approval.
8C. COMMUNITY DEVELOPMENT – CONDUCT A PUBLIC HEARING TO CONSIDER APPROVAL OF LUS24 -00006: CITY OF TORRANCE (RELIGIOUS INSTITUTION
HOUSING OVERLAY ZONE)
Recommendation of the Community Development Director that Planning Commission conduct a public hearing for consideration of proposed amendments to the Torrance Municipal Code pertaining to Religious Institution Housing Overlay Zone (RIH -OZ). The RIH-OZ will apply to properties owned by religious and higher education institutions on or before January 1, 2024 citywide. This project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15061 (b)(3) and Section 15378 (b)(5).
Planning Associate Joe presented Item 8C, presenting amended Torrance Municipal Code documents pertaining to the Religious Institution Housing Overlay Zone per the Commission’s previous feedback.
Chair Kartsonis stated that the State of California created a law forcing municipalities to allow religious and educational institutions to place housing on their properties and clarified that the Item is the City’s response to the State and how the City of Torrance plans to manage it.
Chair Kartsonis disclosed that one of the proposed sites is less than 1000’ from his residence, that there are no financial conflicts of interests, and that his decisions will be based on evidence presented and personal observations.
Helen Lynnfield expressed concerns regarding lack of notifications and traffic impacts.
Planning Associate Joe clarified that there are no projects in development at this time.
Thomas Dorcy stated that he lives across the street from a designated site and inquired if the church had agreed to build housing on their property and inquired if open industrial lots could be substituted for future development.
Robert requested that the church on the corner of El Dorado Street and Maple Avenue be taken off the list as it will have an impact on the community and community utilities.
Margaret Allen requested that the church on El Dorado Street and Maple Avenue be removed from the list as there will be severe traffic impacts.
A member of the public spoke requesting that the church on El Dorado Street and Maple Avenue be removed from the list and expressed concerns on traffic, road infrastructure, and illegal parking.
Vicente Sanchez expressed concerns regarding affordable housing and the impacts it will have on property values, traffic and resources.
A member of the public spoke stating that there are two churches near her that are on the list and expressed concerns on traffic.
Walter Gutierrez spoke, stating that he lives near a church on the list and inquired if the community would have a say in proposed developments.
116
Brittney Jenkins
Recording Secretary
May 7, 2025
Planning Commission 6
Chair Kartsonis clarified that the locations listed in the Religious Institution Overlay Zone was made allowable by State law, not by the City of Torrance, and that the City is looking to put restrictions on any development that will happen at any of the sites per the legal parameters the Commission is allowed.
Commissioner Obejas requested that the flag poles be removed from the list of structures that are allowed to exceed the established building height limit. Planning Manager Martinez stated that staff can explore the request and noted that flag poles are currently restricted to the underlaying height limit of the zone.
Planning Manager Martinez noted that staff included a requirement that if an applicant elects to go through the process and the project is approved, that a sign must be placed during the construction process to inform the public.
Commissioner Borgialli recommended members of the public to reach out to their State representatives to speak on their concerns on the new State law. Commissioner Riggs concurred.
Planning Manager Martinez noted that per State law, this process would be “by right” and that if the project is adopted and it meets development standards, it would be allowed by right with no traffic analysis requirements.
Planning Manager Martinez noted that a webpage is dedicated to the Religious Institution Housing Overlay Zone on the Community Development website and that dates will be provided for when the Item will be presented to City Council.
MOTION: Commissioner Borgialli moved to close the public hearing. Commissioner Yeh seconded the motion; a roll call vote reflected 7-0 approval.
Commissioner Obejas requested that flag poles be excised. Community Development Director Ramirez stated that staff recommends the Commission make their recommendations so that staff can explore the request and provide recommendations to City Council for their consideration.
MOTION: Commissioner Obejas moved to recommend that the flag poles be removed and that the education component is included in the title as staff sees fit. Commissioner Turner seconded the motion; a roll call vote reflected 7-0 approval.
9. RESOLUTIONS - None.
10. COMMISSION ORAL COMMUNICATIONS
None.
11. ADJOURNMENT
MOTION: At 8:30 p.m., Commissioner Borgialli moved to adjourn the meeting to Wednesday, May 21, 2025, at 6:30 p.m. in the Council Chambers. Commissioner Yeh seconded the motion; a roll call vote reflected 7-0 approval.
Approved as amended
July 2, 2025
s/Rebecca Poirier, City Clerk
(ty)
117
118
ATTACHMENT 10
119
120
121
122
123
124
125
126
127
128
129
130
131
132
XX XXX XX
X
X
X
X XX
X
X
X
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
EV ONLYEV ONLY EV ONLYEV ONLY
HB
HB
HB
HB
HB
(62)
(63)
(63)
(64)
(64)
(64)
(65)
(64)
(64)
(63)
(65)
(64)
(65)
(64)
(65)
(65)
(65)
(64)(63)(61)
(60)(59)
(61)
(60)
(61)
(64)
(63)
(63)
(64)
(64)
(64)
(66)
(65)
(65)
(66)
(66)
(65)
(65)
(64)
(62)
(63)
(64)
(64)
(64)
(65)
(65)
(65)
(64)
(66)
(64)
(65)
(63)
(66)
VAN
ACCESS
VAN
ACCESSEV
EV
VAN
ACCESS
VAN
ACCESSEV
EV
TT
RGA
OfficennofnnArchitecturalnnDesignn
n
n
15231nAltonnParkway,nSuiten100n
Irvine,nCAnn92618n
n
Tn949-341-0920n
FXn949-341-0922
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A1-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A1-1P
22065.00
SITE PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
2ND SUBMITTAL8/1/24
VAN NESS AVE
648' 481'
212'
212'
28 DOCK POSITIONS 16 DOCK POSITIONS
8'H GATE
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
140'
140'
PHASE 1PHASE 2
PROJECT INFORMATION
PARCEL:
ZONE
GENERAL PLAN
7352-016-002, 7352-016-003
M2
I-BP
1. A LANDSCAPE PLAN SHALL BE SUBMITTED TO THE COMMUNITY DEVELOPMENT
DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS AND SHALL BE IMPLEMENTED PRIOR TO OCCUPANCY. THE PLAN SHALL UTILIZE
DROUGHT RESISTANT/XERISCAPE PLANT MATERIALS, AND SHALL PROVIDE
STATE-OF-THE-ART WATER SAVING IRRIGATION SYSTEM AND/OR DRIP IRRIGATION FOR LARGER SHRUBS AND TREES. LANDSCAPE SHALL COMPLY WITH STATE
DEPARTMENT OF WATER RESOURCES LANDSCAPE DESIGN & IRRIGATION REQUIREMENTS.
2. THE PROJECT DOES NOT PROPOSE ANY TENANT SIGNAGE AT THIS TIME. SIGNAGE MAY BE SUBMITTED AT A LATER DATE.
3. ALL ROOF-MOUNTED MECHANICAL EQUIPMENT WHICH PROJECTS ABOVE THE
ROOF OF ATHE NEW BUILDINGS AND IS VISIBLE FROM AN ADJACENT PROPERTY OR
ANY PUBLIC STREET SHALL BE SCREENED BY AN APPROVED ENCLOSURE OR PARAPET WHICH IS CONSISTENT WITH THE ARCHITECTURE OF THE BUILDING.
4. THAT EXTERIOR COLOR AND MATERIAL SAMPLES SHALL BE SUBMITTED TO THE
COMMUNITY DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS;
5. A DETAILED WALL/FENCE PLAN, INCLUDING GATES, SHALL BE SUBMITTED TO THE
COMMUNITY DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS.
6. A DETAILED LIGHTING PLAN SHALL BE SUBMITTED TO THE COMMUNITY
DEVELOPMENT DEPARTMENT FOR APPROVAL PRIOR TO THE ISSUANCE OF ANY BUILDING PERMITS.
7. THAT THE APPLICANT SHALL SHOW THE LOCATION OF ALL
ELECTRICAL/MECHANICAL EQUIPMENT LOCATED ON THE PROPERTY AND THE
METHOD OF SCREENING TO THE SATISFACTION OF THE COMMUNITY DEVELOPMENT DIRECTOR. EQUIPMENT CAN NOT BE LOCATED WITHIN THE STREET SETBACK AREAS;
8. ALL FUTURE STREET TREES SHALL NOT BE TRIMMED TO APPEAR LIKE ‘LOLLIPOPS’
9. AT LEAST 2% OF ALL PARKING SPACES MUST BE DEDICATED TO HIGH OCCUPANCY VEHICLES I.E. CARPOOL, VANPOOL, ALTERNATIVE FUEL, ETC.
10. PARKING AREAS HAVING MORE THAN ONE (1) AISLE OR DRIVEWAY SHALL HAVE DIRECTIONAL SIGNS OR MARKINGS PROVIDED IN EACH AISLE OR DRIVEWAY.
11. ALL PARKING AREAS SHALL BE STRIPED WITH DOUBLE LINES (SIX INCHES BOTH
SIDES OF CENTER) BETWEEN STALLS TO FACILIATE THE MOVEMENT INTO AND OUT OF THE PARKING STALLS.
12. POSTS, BUMBERS OR WHEEL-STOPS SHALL BE PROVIDED WHERE PARKING
AREAS BORDER SIDEWALKS WHICH ARE NOT ELEVATED, PUBLIC AND PRIVATE
PROPERTY LINE, BUILDINGS, FENCES OR WALLS, IN SUCH A MANNER THAT NO VEHICLE SHALL OVERHANG OVER A PROPERTY LINE.
GENERAL NOTESVICINITY MAP
W 190TH ST
VAN NESS AVE
15'19'26'9'
10' 19' 26' 8' 6'6'19' 19'35' 35'19'6' 6' 8' 19' 26' 20'19' 15'19'26'9'
56' TYP
153'
40'
30' 67'
45'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
60' 50' 50' 52'
60' 50' 50' 52'
69'
69'5'
5'
56' TYPTYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
50'
42'
42'
35'
8'H GATE
8'H GATE
24 28 30
16 7
47 50
31 7
14 30
30 33
6 33
9 24
1427
4 14
14 14
19 SITE 1SITE 2
W 190TH ST
SITE 1SITE 2
SCALE: 1" = 50'-0" 0' 10' 20' 100'50'
35'19'
5'
35'19'
5'
9 19' 7'
ELEC. ELEC.
6'H TRASH
ENC.
6'H TRASH
ENC.
6'H TRASH
ENC.
6'H TRASH
ENC.
FUTURE PARKING FOR MANUF.
USE (SEE PROJECT DATA ABOVE)
FUTURE PARKING FOR MANUF.
USE (SEE PROJECT DATA ABOVE)
638.26'795.68'
1 9 0 TH S T R E E T
V A N N E S S A V E N U E
1 9 5 TH S T R E E T
3 3 44
45'
REMOVE (E) D/W
45'
REMOVE (E) D/W
45'
REMOVE (E) D/W
42'
REMOVE (E) D/W
49'
REMOVE (E) D/W
PROJECT DATA - WAREHOUSE USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
WAREHOUSE 105,466 SF 140,834 SF 246,300 SF
MANUFACTURING 0 SF 0 SF 0 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
WAREHOUSE @ 1 / 1500 SF 70 94 164
TOTAL 130 154 284
PARKING PROVIDED
STANDARD STALLS 201 229 430
ADA STALLS 7 7 14
TOTAL 208 236 444
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 16 28 44
PROJECT DATA - MANUFACTURING USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
MANUFACTURING 69,000 SF 95,000 SF 164,000 SF
WAREHOUSE 36,466 SF 45,834 SF 82,300 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
MANUF. @ 1 / 400 SF 173 238 410
WAREHOUSE @ 1 / 1500 SF 24 31 55
TOTAL 257 328 585
PARKING PROVIDED
STANDARD STALLS 201 229 430
FUTURE STALLS IN TRUCK YARD 47 93 140
ADA STALLS 7 7 14
TOTAL 255 329 584
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 4 7 11
PROJECT DATA - WAREHOUSE USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
WAREHOUSE 105,466 SF 140,834 SF 246,300 SF
MANUFACTURING 0 SF 0 SF 0 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
WAREHOUSE @ 1 / 1500 SF 70 94 164
TOTAL 130 154 284
PARKING PROVIDED
STANDARD STALLS 201 229 430
ADA STALLS 7 7 14
TOTAL 208 236 444
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 16 28 44
PROJECT DATA - MANUFACTURING USE
BLDG 1 BLDG 2 TOTAL
NET SITE AREA: 271,739 SF 338,891 SF 610,630 SF
6.24 AC 7.78 AC 14.02 AC
BUILDING AREA
FOOTPRINT 112,966 SF 148,334 SF 261,300 SF
MEZZANINE 7,500 SF 7,500 SF 15,000 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
FLOOR AREA BY USE
OFFICE 15,000 SF 15,000 SF 30,000 SF
MANUFACTURING 69,000 SF 95,000 SF 164,000 SF
WAREHOUSE 36,466 SF 45,834 SF 82,300 SF
TOTAL 120,466 SF 155,834 SF 276,300 SF
COVERAGE 41.57% 43.77% 42.79%
F.A.R. 0.443 0.460 0.452
PARKING REQUIRED
OFFICE @ 1 / 250 SF 60 60 120
MANUF. @ 1 / 400 SF 173 238 410
WAREHOUSE @ 1 / 1500 SF 24 31 55
TOTAL 257 328 585
PARKING PROVIDED
STANDARD STALLS 201 229 430
FUTURE STALLS IN TRUCK YARD 47 93 140
ADA STALLS 7 7 14
TOTAL 255 329 584
LANDSCAPE AREA 40,000 SF 42,000 SF 82,000 SF
LANDSCAPE % 14.72% 12.39% 13.43%
DOCK LOADING DOORS 4 7 11
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL 10'H WALL
10'H WALL
(12) BIKE
RACKS
(12) BIKE
RACKS
1,054' - 8'H TUBE STEEL FENCE
8'H GATE
SITE LEGEND:
ADA PATH OF TRAVEL
NEW 8'H BLACK TUBE STEEL FENCE
LANDSCAPE AREA
SCE PAD-MOUNT TRANSFORMER
SCREEN WITH LANDSCAPE
TYPICAL PARKING STALLS - 8.5' X 19'
WITH 2' OVERHANG, TYP.
DOUBLE STRIPE PER CITY STANDARD
T
TRASH ENCLOSURE PLAN
8'-0" CLR
16'-6" CLR.
PAINTED SOLID STEEL
GATES
PAINTED CONCRETE TILT
UP PANELS
PAINTED SOLID STEEL ROOF
6" X 6" CONC. CURB
3" WIDE WHITE
TRAFFIC PAINT
STRIPING
12" WIDE STEP-OFF
CURB AT
LANDSCAPE
FINGERS / END
STALLS
8'-6"8'-6" SEE PLAN
17'-0"
8'-6" TYP.STANDARD
STALL
END
STALL
12" TYP.
EA. SIDE
2'
19'-0"
TYPICAL PARKING STALL
PARKING OVERHANG
133
XX XXX XX
X
X
X
X XX
X
X
X
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
EV ONLYEV ONLY EV ONLYEV ONLY
HB
HB
HB
HB
HB
(62)
(63)
(63)
(64)
(64)
(64)
(65)
(64)
(64)
(63)
(65)
(64)
(65)
(64)
(65)
(65)
(65)
(64)(63)(61)
(60)(59)
(61)
(60)
(61)
(64)
(63)
(63)
(64)
(64)
(64)
(66)
(65)
(65)
(66)
(66)
(65)
(65)
(64)
(62)
(63)
(64)
(64)
(64)
(65)
(65)
(65)
(64)
(66)
(64)
(65)
(63)
(66)
VAN
ACCESS
VAN
ACCESSEV
EV
VAN
ACCESS
VAN
ACCESSEV
EV
TT
RGA
OfficennofnnArchitecturalnnDesignn
n
n
15231nAltonnParkway,nSuiten100n
Irvine,nCAnn92618n
n
Tn949-341-0920n
FXn949-341-0922
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A1-2P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A1-2P
22065.00
FIRE ACCESS PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
2ND SUBMITTAL8/1/24
8'H GATE
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
OFFICE
AREA
26'
26' 26'
26'
40'
67'
45'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
8'H GATE
8'H GATE
8'H GATE
SCALE: 1" = 50'-0" 0' 10' 20' 100'50'
35'
35'
1 9 0 TH S T R E E T
V A N N E S S A V E N U E
1 9 5 TH S T R E E T
8'H GATE
35'
35'
35'35'
26'
26'
26'
26'
134
4' 5'
4'-0" 34'-0" 32'-0" 5'-6" 50'-0" 78'-0" 74'-0" 78'-0" 50'-0" 5'-6" 32'-0" 34'-0" 4'-0" 5'4'
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A2-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A2-1P
22065.00
BUILDING 1 FLOOR PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
r
r
210rProgress,rSuiter220r
Irvine,rCArr92618r
r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
OFFICE
AREA +
3,750 SF
MEZZANINE
OFFICE
AREA +
3,750 SF
MEZZANINE
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
16 DOCK POSITIONS
ELEC ROOM
RAMP UP
RAMP UP
481'-0"
274'-0"
89'-0" 280'-0" 83'-0" 24'-0" 3' 2'-0"
3'-0" 24'-0" 47'-6" 78'-0" 47'-6" 6'-0" 32'-0" 27'-0"
BLDG 1
112,966 SF + 7,500 SF MEZZ
120,466 SF GFA
481'-0"
274'-0"
27'-0"32'-0"6'-0"200'-0"
135
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A2-2P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A2-2P
22065.00
BUILDING 2 FLOOR PLAN
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
r
r
210rProgress,rSuiter220r
Irvine,rCArr92618r
r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
TYPE III-B
S-1
36' CLR.
MAX. HT.: 45'
ELEC ROOM
RAMP UP
RAMP UP
28 DOCK POSITIONS
OFFICE
AREA +
3,750 SF
MEZZANINE
OFFICE
AREA +
3,750 SF
MEZZANINE
648'-0"
2'-0" 3' 24'-0" 85'-0" 448'-0" 86'-0"
274'-0"
3'-0"
24'-0" 48'-0" 78'-0" 48'-0" 6'-0" 32'-0" 27'-0" 4'
BLDG 2
148,334 SF + 7,500 SF MEZZ
155,834 SF GFA
648'-0"
2'-0" 5'-0" 34'-0" 32'-0" 6'-0" 50'-0" 78'-0" 79'-0" 78'-0" 79'-0" 78'-0" 51'-0" 6'-0" 32'-0" 34'-1" 4'-0" 274'-0"
4'27'-0"32'-0"6'-0"200'-0" 5'
4'
136
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A3-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A3-1P
22065.00
BUILDING 1 ELEVATIONS
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
r
r
210rProgress,rSuiter220r
Irvine,rCArr92618r
r
Tr949-341-0920r
FXr949-341-0922
OWNER:
DEVELOPER CONTACT:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
PREPARED BY:
PAINTED ROOF
DOWNSPOUT
TYP.
PAINTED DOCK DOORPAINTED GRADE
RAMP DOOR
OFFICE
ENTRANCE
45'-0"
43'-0"
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
43'-0"
41'-0"
43'-0"
41'-0"
45'-0"
41'-0"
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
OFFICE
ENTRANCE
NOTES:
1. ALL ROOFTOP MECH. EQUIPMENT SHALL BE SCREENED
FROM VIEW.
1. FIELD COLOR
SW 7636 - ORIGAMI WHITE
2. LIGHT ACCENT COLOR
SW 6002 - ESSENTIAL GRAY
3. RIBBED CONCRETE PANEL
ACCENT COLOR
SW 2819 - DOWNING SLATE
4. ACCENT COLOR
SW 2819 - DOWNING SLATE
5. RIBBED CONCRETE PANEL
DARK ACCENT COLOR
SW 7069 - IRON ORE
6. CANOPIES: ALUCOBOND:
CLEAR ANODIZED
7. GLAZING: PPG SOLARCOOL PACIFICA
CLEAR ANODIZED STOREFRONT
FINISH SCHEDULE:
LIGHT FIXTURE STYLE:
137
SEQUOIA COMMERCE CENTER
19250 / 19320 VAN NESS AVENUE, CITY OF TORRANCE
SHEET TITLE
MARK DESCRIPTIONDATE A3-1P
COPYRIGHT: RGA, OFFICE OF ARCHITECTURAL DESIGN
CHK'D BY:
DRAWN BY:
CAD FILE NAME:
RGA PROJECT NO:
CS
DR
22065-00-A3-1P
22065.00
BUILDING 2 ELEVATIONS
CONCEPTUAL SITE PLAN02/13/2024
PLANNING APPLICATION4/3/2024
RGA
OfficerrofrrArchitecturalrrDesignr
r
r
210rProgress,rSuiter220r
Irvine,rCArr92618r
r
Tr949-341-0920r
FXr949-341-0922
PREPARED BY: OWNER:
DEVELOPER CONTACT:
NOTES:
1. ALL ROOFTOP MECH. EQUIPMENT SHALL BE SCREENED
FROM VIEW.
LIGHT FIXTURE STYLE:
PAINTED ROOF
DOWNSPOUT
TYP.
OFFICE
ENTRANCE
SCALE: 1" = 20'-0" 0' 10' 20' 50'5'
45'-0"
43'-0"
OFFICE
ENTRANCE
45'-0"
43'-0"
45'-0"
43'-0"
45'-0"
41'-0"
45'-0"
43'-0"
41'-0"
43'-0"
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
41'-0"
45'-0"
1. FIELD COLOR
SW 7636 - ORIGAMI WHITE
2. LIGHT ACCENT COLOR
SW 6002 - ESSENTIAL GRAY
3. RIBBED CONCRETE PANEL
ACCENT COLOR
SW 2819 - DOWNING SLATE
4. ACCENT COLOR
SW 2819 - DOWNING SLATE
5. RIBBED CONCRETE PANEL
DARK ACCENT COLOR
SW 7069 - IRON ORE
6. CANOPIES: ALUCOBOND:
CLEAR ANODIZED
7. GLAZING: PPG SOLARCOOL PACIFICA
CLEAR ANODIZED STOREFRONT
FINISH SCHEDULE:
IPERS SEQUOIA COMMERCE CENTER, INC.
CONTACT: DANIEL PATTERSON
1630 SOUTH SUNKIST STREET, SUITE A
ANAHEIM, CA 92806
DWS RREEF
NICK ZAHAROV
TEL: 415-547-9098
[email protected]
41'-0"
138