8E
Date: April 21, 2026
To: Honorable Mayor and Members of the City Council
From: Craig Bilezerian, Public Works Director
By: Brenda Moun, Engineering Manager | [email protected] Subject: Public Works – Approve Amendments for Measure M Multi-Year Subregional Funding Agreements for the Torrance School Safety and Accessibility Program, I-188. Expenditure: None.

RECOMMENDATION
Recommendation of the Public Works Director that City Council:

1. Approve Amendment No. 3 to Measure M Multi-Year Subregional Funding Agreement #9200000000M460105 (C2020-046) with the Los Angeles County Metropolitan Transportation Authority (LACMTA) to modify the scope of work for the Torrance School Safety and Accessibility Program, I-188 (Phase I); and

2. Approve Amendment No. 1 to Measure M Multi-Year Subregional Funding Agreement #9200000000M460108 (C2023-125) with the Los Angeles County Metropolitan Transportation Authority (LACMTA) to modify the scope of work for the Torrance School Safety and Accessibility Program, I-188 (Phase II).

FUNDING
None required.

DISCUSSION
The Torrance School Safety and Accessibility Program, I-188 (“I-188 Project”) is a multi-year Capital project which will improve existing infrastructure in neighborhoods around twelve elementary schools in the City of Torrance to encourage pedestrian and bicycle modes of transportation to the schools. Specifically, the proposed improvements include: localized improvements to sidewalks and curb access ramps; installation of high visibility crosswalks; signage upgrades; installation of pedestrian pushbuttons and countdown timers at traffic signals; installation of bicycle lanes, when there is no negative impact to travel lanes or on-street parking; installation of bicycle routes; and installation of bicycle racks. Phase I includes the neighborhoods surrounding Fern Elementary, Seaside Elementary, Carr Elementary, Anza Elementary, Torrance Elementary and Walteria Elementary (Attachment 1). Phase II includes the neighborhoods surrounding Edison Elementary, Victor Elementary, Madrona Middle, Wood Elementary, Riviera Elementary and Arnold Elementary (Attachment 2).
1 City Council
April 21, 2026

Page 2 ends

In 2020, the City secured $5,027,800 of Measure M grant funds from the LACMTA for Phase I.

Subsequently, two amendments were executed to collectively increase the grant funds to $7,185,000 and extend the lapse date of the funds. In 2023, the City secured an additional $10,372,609 of Measure M grant funds from the LACMTA for Phase II.

Construction around the first two schools in Phase I (Fern Elementary, Seaside Elementary) was completed in May 2025. Construction around the next two schools in Phase I (Anza Elementary, Torrance Elementary) is scheduled to begin in summer 2026. Design is currently in progress for the first three school areas in Phase II (Edison Elementary, Victor Elementary, Madrona Middle) and construction is scheduled to begin in 2027.

Execution of the two recommended Amendments, each to its related existing Funding Agreement, is necessary to modify the scope of work for the schools in Phase I and Phase II. During the design phase of the projects, consideration of installing Class II bicycle lanes on roadways originally identified on the grant applications, including Torrance Boulevard, Sepulveda Boulevard, and Del Amo Boulevard, was determined to not be feasible. Based on the existing geometric constraints of these three roadways where improvements were considered, there is insufficient right-of-way to accommodate a dedicated Class II bicycle lane without eliminating either a travel lane and/or on-street parking. The elimination of a travel lane and/or on-street parking would have significant negative impacts. Therefore, the revised scope of work eliminates the consideration of the Class II bicycle lanes and, instead, a Class III bicycle route will be implemented. If the existing roadway currently has a Class III bicycle route, the Class III bicycle route will remain. Metro staff has approved the proposed changes to the scope as provided in the recommended amendments.

Further information about these projects and all other active infrastructure projects can be found on the Public Works website at: https://www.torranceca.gov/our-city/capital-improvement-projects

ATTACHMENTS

1. Project Location Map – Phase I

2. Project Location Map – Phase II

3. Amendment No. 3 to Funding Agreement #9200000000M460105

4. Amendment No. 1 to Funding Agreement #9200000000M460108 2 Carr
ES
Fern
ES
Anza
ES
Seaside
ES
Walteria
ES
Torrance

ESSEPULVEDA BLVD

ARTESIA BLVD

LOMITA BLVD

ANZA AVE
VAN
NESS
AVE

PRAIRIE
AVE

PACIFIC COAST HWY
190TH ST

CALLE MAY OR
235TH ST

CABRILLO
AVE
M

APLE AVE

ARLINGTON AVE
M

ADRONA AVE

CARSON ST
W

ESTERN AVE
HAW

THORNE BLVD

REDONDO BEACH BLVD

PALOS VERDES BLVD

CRENSHAW
BLVD
182ND ST

TORRANCE BLVD

DEL AMO BLVD
School Safety and Accessibility Program I-188
GIS\SchoolMap(I-188)
´
Legend
Work Limit
Elementary School
3 ATTACHMENT 1

PHASE I

TORRANCE BOULEVARD

ANZA AVENUE

MADRONA AVENUE

VAN NESS AVENUE

DEL AMO BOULEVARD

PRAIRE AVENUE

ARTESIA BOULEVARD

REDONDO BEACH BOULEVARD
182ND STREET182ND STREET
190TH STREET190TH STREET

HAWTHORNE BOULEVARD

WESTERN AVENUE

CRENSHAW BOULEVARD

TORRANCE BOULEVARD

WESTERN AVENUE

HAWTHORNE BOULEVARD

DEL AMO BOULEVARD
405

INTERSTATE
405

INTERSTATE
405

INTERSTATE

ANZA AVENUE

CRENSHAW BOULEVARD CRENSHAW BOULEVARD

VAN NESS AVENUE

SEPULVEDA BOULEVARD

LOMITA BOULEVARDPACIFIC COAST HIGHWAY

PACIFIC COAST HIGHWAY

CRENSHAW BOULEVARD

PALOS VERDES BOULEVARD

CABRILLO AVENUE

CABRILLO AVENUE

ARLINGTON AVENUE
PROJECT 1 (AREAS 1 - 3)
SCALE: 1" = 100'
(AT 24"X36")
PREPARED BY: J. GATZA
DATE: 11/22/21
LEGEND

TORRANCE SCHOOL SAFETY AND

ACCESSIBILITY PROGRAM - PHASE II

EXISTING SCHOOL

CITY OF TORRANCE

PUBLIC WORKS PROJECT OVERVIEW MAP
AREA 2

VICTOR ELEMENTARY
AREA 5

RIVIERA ELEMENTARY
AREA 4

WOODS ELEMENTARY
AREA 6

ARNOLD ELEMENTARY
AREA 3

MADRONA ELEMENTARY
AREA 1

EDISON ELEMENTARY

REGIONAL VICINITY MAP
N.T.S.

PROJECT LOCATION
PROJECT 2 (AREAS 4 - 6)
4 ATTACHMENT 2

ATTACHMENT 3
FTIP#: LA9918834
Subregion ID: SOUTH BAY
Project ID#: MM4601.05
Amendment No. 3
FA#: 9200000000M460105
A MENDMENT No. 3 TO MEASURE M FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 3 to the Funding Agreement (this “Amendment”), is dated as of May 1, 2025, by and between the City of Torrance ("GRANTEE") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. GRANTEE and LACMTA entered into that certain Funding Agreement No. 9200000000M460105, dated December 16, 2019, which was amended on October 18, 2021 and April 15, 2024 (as amended, the "Existing FA"), which Existing FA provides for the Torrance Schools Safety and Accessibility Program, (“the Project”); and B. WHEREAS, LACMTA Board on September 23, 2021, delegated administrative authority to modify the scope of work of projects and project development phases consistent with eligibility requirements; and
C. WHEREAS, LACMTA administratively approved minor changes to the Scope of Work; and
D. GRANTEE and LACMTA desire to amend the Existing FA as provided herein.

Rev: 01.29.2024 1 Measure M MSP FA Amendment
5 FTIP#: LA9918834
Subregion ID: SOUTH BAY
Project ID#: MM4601.05
Amendment No. 3
FA#: 9200000000M460105
AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. 2.

3. Attachment B-2 of the Existing FA is hereby replaced by Attachment Attachment C-1 of the Existing FA is hereby replaced by Attachment Except as expressly amended hereby, the Existing FA remains in full B-3, attached.

C-2, attached.
force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged .

Rev: 01.29.2024 2 Measure M MSP FA Amendment
6 FTIP#: LA9918834
Subregion ID: SOUTH BAY
Project ID#: MM4601.05
Amendment No. 3
FA#: 9200000000M460105
IN WITNESS WHEREOF, the parties have caused this Amendment No. 3 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________
Stephanie Wiggins
Date: ____________________
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
Digitally signed by: 4dd8a4b6-a104-
429a-9907-9b6d6de7c696DN: CN = 4dd8a4b6-a104-429a-9907- 9b6d6de7c696
Date: 2025.07.24 16:26:48 -08'00'
By: ________________________________________
Deputy
Date: ____________________
GRANTEE:

City of Torrance
By: _______________________________________ Date: ____________________ Aram Chaparyan
Mayor
APPROVED AS TO FORM:

Patrick Q. Sullivan
City Attorney
By: _______________________________________
Galen W. Bean
Date: ____________________
Legal Counselor
ATTEST:

By: _______________________________________
Rebecca Poirier, MMC City Clerk
Date: ____________________
Rev: 01.29.2024 3 Measure M MSP FA Amendment
7 ATTACHMENT B -3 EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M MSP - Transportation System & Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460105 Project Title: TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM Project#: MM4601.05

PROGRAMMED SOURCES OF FUNDS
TOTAL
BUDGET
FY 2019-20
Qtr 4
FY 2020-21
Qtr 1
FY 2020-21
Qtr 2
FY 2020-21
Qtr 3
FY 2020-21
Qtr 4
FY 2021-22
Qtr 1
FY 2021-22
Qtr 2
FY 2021-22
Qtr 3SOURCES OF FUNDS
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
$15,462 $28,053 $7,787 $42,494 $82,546 $21,353 $197,695 $0
$150 $150
Vehicle Purchase
Others
$0
$0
Total Measure M
SUM PROG LACMTA FUNDS:
$15,462
$15,462
$28,053
$28,053
$7,787
$7,787
$150
$150
$0
$0
$42,494
$42,494
$82,546
$82,546
$21,353
$21,353
$197,845
$197,845
OTHER NON LACMTA FUNDING:

LOCAL: Measure M Local Return
Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$2,442
$2,442
$5,969
$5,969
$6,244
$6,244
$14,330
$14,330
$3,277
$3,277
$32,262
$0
$0
$0
$0
Total LOCAL $0
$0
$0
$0
$0
$0
$0
$0
$0
$32,262
STATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$0
$0
$0
$0
$0
$0
$0
$0Total STATE
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
$0 $0 $0 $0 $0
$0
$0
$0
$0
$0
$0
$0
$0
Vehicle Purchase
Others
Total FEDERAL $0 $0 $0 $0 $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
$0
$0
$0
$0
$0
$0
$0
$0
Vehicle Purchase
Others
Total PRIVATE $0 $0 $0
$0
$0
$0
$0
$0
$0 $0 $0
SUM NON-LACMTA FUNDS : $2,442 $5,969 $6,244 $14,330 $3,277 $32,262 $17,904 $34,022 $7,787 $150 $0 $48,738 $96,876 $24,630 $230,107 Measure M Funding Agreement - MSP
Attachment B - 3 Expenditure Plan09.10.19 1 of 4
8 ATTACHMENT B -3 EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M MSP - Transportation System & Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460105 Project Title: TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM Project#: MM4601.05

PROGRAMMED SOURCES OF FUNDS
FY 2021-22
Qtr 4
FY 2022-23
Qtr 1
FY 2022-23
Qtr 2
FY 2022-23
Qtr 3
FY 2022-23
Qtr 4
FY 2023-24
Qtr 1
FY 2023-24
Qtr 2
FY 2023-24
Qtr 3
TOTAL

BUDGETSOURCES OF FUNDS
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
$7,367 $26,613 $33,980
$0
$0
Vehicle Purchase $0
Others $0
Total Measure M
SUM PROG LACMTA FUNDS:
$0 $0 $0 $7,367
$7,367
$26,613
$26,613
$0 $0 $0 $33,980
$0 $0 $0 $0 $0 $0 $33,980
OTHER NON LACMTA FUNDING:

LOCAL: Measure M Local Return
Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$1,202
$1,202
$4,640
$4,640
$5,842
$0
$0
$0
$0
Total LOCAL $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$5,842
STATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$0
$0
$0
$0
$0
$0
$0
$0Total STATE $0 $0
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$0
$0
$0
$0
$0
$0
$0
$0Total FEDERAL $0 $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E $0
Right-of-Way Acquisition
Construction
$0
$0
Vehicle Purchase $0
Others $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0Total PRIVATE
SUM NON-LACMTA FUNDS : $1,202 $4,640 $5,842
$0 $0 $0 $8,569 $31,253 $0 $0 $0 $39,822
Measure M Funding Agreement - MSP
Attachment B - 3 Expenditure Plan09.10.19 2 of 4
9 ATTACHMENT B -3 EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M MSP - Transportation System & Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460105 Project Title: TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM Project#: MM4601.05

PROGRAMMED SOURCES OF FUNDS
FY 2023-24
Qtr 4
FY 2024-25
Qtr 1
FY 2024-25
Qtr 2
FY 2024-25
Qtr 3
FY 2024-25
Qtr 4
FY 2025-26
Qtr 1
FY 2025-26
Qtr 2
FY 2025-26
Qtr 3
TOTAL

BUDGETSOURCES OF FUNDS
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$92 $1,198 $171,890 $173,180
$0
$5,878,628
$0
$75 $2,114,290 $789,600 $789,383 $1,092,640 $1,092,640
$0
Total MEASURE M $167
$167
$1,198
$1,198
$2,114,290
$2,114,290
$789,600
$789,600
$789,383
$789,383
$171,890
$171,890
$1,092,640
$1,092,640
$1,092,640
$1,092,640
$6,051,808
$6,051,808SUM PROG LACMTA FUNDS:

OTHER NON LACMTA FUNDING:

LOCAL: Measure M Local Return
Planning Activities/Prog Dev
Environmental
$0
$0
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$28,110
$28,110
$28,110
$0
$961,335
$0
$0
$989,445
$345,803
$345,803
$129,121
$129,121
$129,041
$129,041
$178,685
$178,685
$178,685
$178,685Total LOCAL $0
$0
$0
$0
$0
$0
STATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$0
$0
$0
$0
$0
$0
$0
$0Total STATE $0 $0 $0 $0 $0 $0
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total FEDERAL $0 $0 $0 $0 $0 $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
Others
Total PRIVATE $0
$0
$0
$0
$0
$345,803
$0
$129,121
$918,721
$0
$129,041
$918,424
$0
$28,110
$0
$178,685
$0
$178,685
$0
$989,445SUM NON-LACMTA FUNDS :
$167 $1,198 $2,460,093 $200,000 $1,271,325 $1,271,325 $7,041,253 Measure M Funding Agreement - MSP
Attachment B - 3 Expenditure Plan09.10.19 3 of 4
10 ATTACHMENT B -3 EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M MSP - Transportation System & Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460105 Project Title: TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM Project#: MM4601.05

PROGRAMMED SOURCES OF FUNDS
FY 2025-26
Qtr 4
FY 2026-27
Qtr 1
FY 2026-27
Qtr 2
FY 2026-27
Qtr 3
FY 2026-27
Qtr 4
FY 2027-28
Qtr 1
FY 2027-28
Qtr 2
FY 2027-28
Qtr 3
TOTAL

BUDGETSOURCES OF FUNDS
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$901,367 $901,367
$0
$0
$901,367
$901,367
Vehicle Purchase
Others
Total MEASURE M $0
$0
$0
$0
$901,367
$901,367
$0
$0
$0
$0
$0
$0
$0
$0SUM PROG LACMTA FUNDS:

OTHER NON LACMTA FUNDING:

LOCAL: Measure M Local Return
Planning Activities/Prog Dev
Environmental
$0
$0
$0Design and PS&E
Right-of-Way Acquisition
Construction
Vehicle Purchase
$0
$147,451
$0
$0
$147,451
$147,451
$147,451
Others
Total LOCAL $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
STATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
$0
$0
$0
$0
$0
$0
$0
$0
Vehicle Purchase
Others
Total STATE $0
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
Design and PS&E
Right-of-Way Acquisition
Construction
$0
$0
$0
$0
$0
$0
$0
$0
Vehicle Purchase
Others
Total FEDERAL $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev
Environmental
$0
$0
$0
Design and PS&E $0
Right-of-Way Acquisition
Construction
Vehicle Purchase
$0
$0
$0
Others $0
Total PRIVATE $0
$0
$0
$0
$0
$0
$0
$147,451
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
SUM NON-LACMTA FUNDS : $147,451
$1,048,818$1,048,818

TOTAL LACMTA FUNDS

TOTAL NON-LACMTA FUNDS

TOTAL PROJECT FUNDING
$15,629
$2,442
$29,251
$5,969
$3,023,444
$493,254
$797,117
$130,323
$927,440
$815,996
$133,681
$949,677
$214,384
$34,354
$1,175,186
$193,015
$1,113,993
$181,962
$7,185,000
$1,175,000
$8,360,000$18,071 $35,220 $3,516,698 $248,738 $1,368,201 $1,295,955 Measure M Funding Agreement - MSP
Attachment B - 3 Expenditure Plan09.10.19 4 of 4
11 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
ATTACHMENT C-2

SCOPE OF WORK

CAPITAL PROJECT
PROJECT NAME: TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM PROJECT LOCATION/LIMITS/AREA:

The project is located around six elementary schools in the City of Torrance, in the Los Angeles area.

This project limits are:

1. Fern Elementary School: Neighborhood bounded by Carson St, Hickory Ave, Maricopa St, and Crenshaw Blvd.

2. Seaside Elementary School: Neighborhood bounded by Reese Rd, Linda Dr, Sepulveda Blvd, and Anza Ave.

3. Carr Elementary School: Neighborhood bounded by Artesia Blvd, Yukon Ave, Redondo Beach Blvd, and Crenshaw Blvd.

4. Anza Elementary School: Neighborhood bounded by Carson St, Palos Verdes Blvd, Torrance Blvd, and Anza Ave.

5. Torrance Elementary School: Neighborhood bounded by Sepulveda Blvd, Crenshaw Blvd, BNSF Railroad tracks and Cabrillo Ave.

6. Walteria Elementary School: Neighborhood bounded by Hawthorne Blvd, Pacific Coast Highway, Tandem Way and Winlock Rd.

PROJECT DESCRIPTION INCLUDING MULTI-YEAR SUBREGIONAL PROGRAM AND PROJECT NEXUS:

The purpose of the project is to improve mobility, increase accessibility, and enhance safety for pedestrians and bicyclists within neighborhoods surrounding six Torrance Elementary schools by offering alternative modes of transportation. The implementation of the project will improve public health by encouraging students and families to walk and bicycle to school, reduce greenhouse gas emissions, and aid in the overall reduction of vehicular traffic congestion and conflicts with non-motorized users in the neighborhoods.

03.01.19 1 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
12 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
SCOPE:

Mobility and accessibility will be improved by removing existing pedestrian barriers and creating a continuous active transportation network that provides a safe and continuous path of travel to the school and surrounding area.

Safety will be improved by removing pedestrian barriers and by installing new pedestrian signal equipment at critical crossing points, and new high visibility signing and striping to help alert drivers of non-motorized users.

The project will also expand the bicycle network to join existing routes and bring continuity to the overall system. Bicycle amenities will also be installed at major destination points in the neighborhood to promote bicycling.

More specifically, the scope of work includes construction of new sidewalks in existing “gap” areas within the path of travel, eliminating barriers in the sidewalk infrastructure, installing pedestrian signal equipment at existing signalized intersections, installing high visibility crosswalk striping and signage at stopped controlled intersections, installing bicycle signage for new Class III bike routes, and installing new bicycle racks.

Specific improvements at each school location are provided in the attached exhibits.

DESIGN:

I. Preliminary Design
A. Read, review and understand all aspects and goals of the Lead Agency’s General Plan Circulation Element.

B. Engage in planning discussions with impacted schools.

C. Field visits of the project areas to identify scope and design issues.

D. Discussions with City Arborist regarding impacted trees.

E. Prepare Engineer’s construction cost estimates.

II. Environmental Analysis
A. Define a complete and detailed project description and delineate project study areas.

B. Conduct the required technical analysis for the project evaluation.

C. Prepare and file Notice of Exemption.

III. Final Design – Plans, Specifications and Estimates A. Walk neighborhoods to quantify repairs needed. Record existing site conditions in photographs and/or video.

B. Identify and coordinate with all utilities in the project area (if necessary).

C. Identify existing survey monuments to be impacted during construction.

D. Coordinate review by City Arborist of street trees to be impacted,

03.01.19 2 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
13 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
E. Prepare quantity tables of repairs to be performed.

F. Prepare construction specifications consistent with City format (SSPWC “Greenbook” APWA, current edition with updates.

G. Prepare an engineer’s construction cost estimate based on the itemized quantity take-off from the contract documents at 90% complete and final in a spreadsheet format.

IV. Project Management and Preparation of Periodic Updated Schedule, Deliverables and Meetings
A. Design Kick-off Meeting and progress meetings.

B. Provide periodic schedule updates on deliverables and meetings as changes to original schedule occur or as needed based on the needs of the project.

RIGHT-OF-WAY:

Right-of-Way Support and Right-of-Way Capital N/A
CONSTRUCTION:

Grantee expects to provide construction oversight, and/or procure a consultant for construction inspection services, award a contract for construction and to perform the following tasks:

A. Provide or contract for Construction Inspection for the Project. This will be accomplished through an RFP if not provided by staff.

B. Contract with a Contractor for construction.

C. Register project on Department of Industrial Relations website to obtain project number.

D. Preparation and approval of SWPPP, creation of project on State Water Board site, issuance of Notice of Intent.

E. Conduct Preconstruction Meeting.

F. Contractor to submit submittals for City review and approval.

G. City Arborist to tag existing trees to be removed.

H. Contractor and Inspector walk job sites to mark out removals.

I. Contractor submits DigAlert ticket requests.

J. Contractor distributes advanced construction notices to neighborhood.

K. Contractor’s surveyor ties out all existing survey monuments.

L. Contractor commences tree removal and root pruning activities.

M. Contractor commences concrete removal and replacement activities.

N. Contractor repairs sprinklers and affected parkways following concrete construction.

O. Periodic construction progress meetings as necessary.

P. Contractor and inspector verify completed quantities monthly and submits invoice.

Q. Contractor’s surveyor reestablished disturbed survey monuments. Files records with County.

03.01.19 3 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
14 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
R. Contractor plants replacement trees, provides care during maintenance period.

S. Final walk-through and punchlist.

T. Project close-out and release of retention.

PROJECT FUNDING:

LACMTA –

MEASURE M FUNDS

LOCAL AGENCY
(IF ANY)PHASE
PS and E
Construction Support*
Construction Capital*
TOTAL
$390,000
$760,000
$7,210,000
$8,360,000
$351,644
$685,255
$6,148,101
$7,185,000
$38,356
$74,745
$1,061,899
$1,175,000TOTAL BUDGET COST
ESTIMATED PROJECT COSTS:

ITEM DESCRIPTION QUANTITY UNIT UNIT COST
$60,000
$1,140,000
$120,000
$70,000
$1,330,000
$140,000
$100,000
$1,850,000
$190,000
$40,000
$730,000
$80,000
$50,000
$940,000
$100,000
$70,000
$1,220,000
$130,000
$8,360,000

TOTAL COST
$60,000
$1,140,000
$120,000
$70,000
$1,330,000
$140,000
$100,000
$1,850,000
$190,000
$40,000
$730,000
$80,000
$50,000
$940,000
$100,000
$70,000
$1,220,000
$130,000
$8,360,000
Design Fern Elementary improvements
Construct Fern Elementary improvements
CM Fern Elementary improvements
Design Seaside Elementary improvements
Construct Seaside Elementary improvements
CM Seaside Elementary improvements
Design Carr Elementary improvements
*Construct Carr Elementary improvements
CM Carr Elementary improvements
Design Anza Elementary improvements
Construct Anza Elementary improvements
CM Anza Elementary improvements
Design Torrance Elementary improvements
Construct Torrance Elementary improvements
CM Torrance Elementary improvements
Design Walteria Elementary improvements
*Construct Walteria Elementary improvements
CM Walteria Elementary improvements
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS

GRAND TOTAL

03.01.19 4 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
15 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
PROJECT DETAILED SCHEDULE:

Amendment 2
Project Schedule
Revised Project
ScheduleFA Milestones
Milestones Begin End Begin End
Design Fern Elementary School
improvements Jun-20 Feb-24 Dec-20
Jul-24
Jan-24
Construct Fern Elementary
School improvements Aug-24
Nov-20
Aug-24
Jul-22
Nov-24
Feb-24
Nov-24
Dec-24
Mar-26
Feb-25
Mar-26
Feb-25
Mar-26
Feb-25
Mar-26
Mar-25
Jan-24
Mar-25
Sep-25
Apr-27
May-25
Mar-26
May-25
Mar-26
Sep-25
Apr-27
Design Seaside Elementary
School improvements Dec-20
Jul-24Construct Seaside Elementary
School improvements
Design Carr Elementary School
improvements Apr-25
Nov-26
Dec-24
Sep-25
Dec-24
Sep-25
Apr-25
Nov-26
*Construct Carr Elementary
School improvements Aug-25
Jul-22Design Anza Elementary
School improvements
Construct Anza Elementary
School improvements Aug-25
Jul-23Design Torrance Elementary
School improvements
Construct Torrance Elementary
School improvements Aug-25
Jul-23Design Walteria Elementary
School improvements
*Construct Walteria Elementary
School improvements Aug-25
Total Project Duration
(months) 69 months 76 months
*City of Torrance is requesting additional MM MSP funding to complete construction.

03.01.19 5 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
16 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.05
Amendment No. 3
Funding Agreement#: 9200000000M460105
PROJECT MAP:

03.01.19 6 Measure M Funding Agreement – MSP
Attachment C – 2 Scope of Work
17 MAPLE AVE HICKORY AVE

HICKORY AVE
TS

PATRONELLA AVE
1 GREENWOOD AVE
SCALE: 1"=1500'
CERISE AVE1) PROPOSED BIKE ROUTE (CLASS III)

ALASKA AVE / COLUMBIA ST FROM MARICOPA ST

TO MAPLE AVE AND

MAPLE AVENUE FROM TORRANCE BLVD

TO DEL AMO BLVD GREENWOOD
PARK
2) PROPOSED BIKE FRIENDLY STREET (CLASS III)

ELM AVE FROM TORRANCE BLVD TO MARICOPA ST FAYSMITH AV E TS

FERN AVE
FERN

ELEMENTARY
2 ELM AVE

ELM AVE
2 ERIEL AVE

DATE AVEDATE AVE
TSCRENSHAW BLVD TSTS TS1

EXAMPLE OF PEDESTRIAN OBSTRUCTION AND

UNSAFE CONDITIONS DUE TO UPLIFTED /
DAMAGED SIDEWALK SCALE: 1" = 200'
LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE FRIENDLY

STREET (PER SOUTH BAY BMP)

PROPOSED BIKE ROUTE
(PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS

PROPOSED INTERSECTION

SAFETY UPGRADESTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM FERN ELEMENTARY - 1314 FERN AVENUE
18 TS
TS
SCALE: 1"=1000'

PROPOSED BIKE ROUTE (CLASS III) TS

PALOS VERDES BLVD FROM SEPULVEDA BLVD TO SUSANA AVE
SCALE: 1"=1000'
2 PROPOSED BIKE LANES (CLASS II)

CALLE MAYOR FROM ANZA AVE TO PCH
1 1 2 231ST

STEXAMPLES OF PEDESTRIAN OBSTRUCTIONS AND UNSAFE
CONDITIONS DUE TO UPLIFTED / DAMAGED SIDEWALK TS TS SCALE: 1" = 350' LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE LANES
(PER SOUTH BAY BMP)

PROPOSED BIKE ROUTE
(PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS

PROPOSED INTERSECTION

SAFETY UPGRADESTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM SEASIDE ELEMENTARY - 4651 SHARYNNE LANE
19 TS
1 3
SCALE: 1" = 1500'

PROPOSED BIKE FRIENDLY STREETS (CLASS III)
171ST ST FROM YUKON AVE TO VAN NESS AVE AND

YUKON AVE FROM ARTESIA BLVD TO REDONDO BEACH BLVD
2 1 2
3 EXAMPLES OF PEDESTRIAN OBSTRUCTIONS AND UNSAFE

CONDITIONS DUE TO UPLIFTED / DAMAGED SIDEWALK

TS ARTESIA BLVD
SCALE: 1" = 350'
LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE ROUTE
(PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS FOR PEDESTRIAN

SAFETY AND ACCESSIBILITY

PROPOSED INTERSECTION

SAFETY ENHANCEMENTSTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM CARR ELEMENTARY - 3404 168TH STREET
20 TS TS

DRLEE ST
SCALE: 1" = 1500'

PROPOSED BIKE FRIENDLY STREET (CLASS III)

OCEAN AVE FROM CARSON ST TO TORRANCE BLVD
3 LILLIAN ST

LENORE AVE

CARMEN ST
1 2
2 3
1EXAMPLE OF PEDESTRIAN OBSTRUCTION AND UNSAFE

CONDITIONS DUE TO UPLIFTED / DAMAGED SIDEWALK
SCALE: 1" = 350'
LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE FRIENDLY

STREET (PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS FOR PEDESTRIAN

SAFETY AND ACCESSIBILITY

PROPOSED INTERSECTION

SAFETY ENHANCEMENTSTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM ANZA ELEMENTARY - 21400 ELLINWOOD DRIVE
21 TSSCALE: 1" = 1500'

PROPOSED BIKE ROUTE (CLASS III)
PLAZA DEL AMO FROM 222ND ST TO CARSON ST AND

SEPULVEDA BLVD FROM CRENSHAW BLVD TO CABRILLO AVE
1 3
TS

TORRANCE
2 1 2

EXAMPLE OF DISCONTINUOUS PATH OF TRAVEL WAY

AND/OR UNSTABLE WALKING SURFACE
TSTSTS
3 EXAMPLE OF PEDESTRIAN OBSTRUCTION AND UNSAFE

CONDITIONS DUE TO UPLIFTED / DAMAGED SIDEWALK
SCALE: 1" = 400'
LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE ROUTE
(PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS FOR PEDESTRIAN

SAFETY AND ACCESSIBILITY

PROPOSED INTERSECTION

SAFETY ENHANCEMENTSTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM TORRANCE ELEMENTARY - 2125 LINCOLN AVENUE
22 3
SCALE: 1" = 1500'

PROPOSED BIKE FRIENDLY STREETS (CLASS III)
TSNEWTON ST FROM 242ND ST TO PCH AND
OCEAN AVE FROM NEWTON ST TO PCH 1

ELEMENTARY
2 1 3 TS

EXAMPLE OF DISCONTINUOUS PATH OF TRAVEL WAY

AND/OR UNSTABLE WALKING SURFACE
2 EXAMPLE OF PEDESTRIAN OBSTRUCTION AND UNSAFE
CONDITIONS DUE TO UPLIFTED / DAMAGED SIDEWALK SCALE: 1" = 350' LEGEND

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED ADA CURB

RAMP IMPROVEMENT

PROPOSED BICYCLE
RACK

EXISTING

BUS STOP

CITY OF TORRANCE

PUBLIC WORKS DEPARTMENT

LIMITS OF PROPOSED

PEDESTRIAN IMPROVEMENTS

PROPOSED BIKE FRIENDLY

STREET (PER SOUTH BAY BMP)

PROPOSED TRAFFIC SIGNAL

IMPROVEMENTS FOR PEDESTRIAN

SAFETY AND ACCESSIBILITY

PROPOSED INTERSECTION

SAFETY ENHANCEMENTSTS TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM WALTERIA ELEMENTARY - 24456 MADISON STREET
23 FTIP#: N/A
Subregion ID: South Bay
Project ID#: MM4601.08
Amendment No. 1
FA#: 9200000000M460108
Rev: 01.29.2024 1 Measure M MSP FA Amendment
AMENDMENT No. 1 TO MEASURE M FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 1 to the July 1,
2025 by and between the City of Torrance ("GRANTEE") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. GRANTEE and LACMTA entered into that certain Funding Agreement No. 9200000000M460108, dated April 3, 2023, (the "Existing FA"), which Existing FA provides for the TORRANCE SCHOOL SAFETY AND ACCESSIBILITY PROGRAM PHASE II,
B. WHEREAS, the LACMTA Board on September 23, 2021, delegated administrative authority to staff to extend the funding lapsing date of the Measure M Funds previously approved to meet environmental, design, right-of-way and construction time frames; and
C. WHEREAS, LACMTA Board on September 23, 2021, delegated administrative authority to modify the scope of work of projects and project development phases consistent with eligibility requirements; and
D. WHEREAS, the GRANTEE and LACMTA desire to extend the lapse date of FY 2022-23 funds to June 30, 2026; and
E. WHEREAS, LACMTA administratively approved minor changes to the Scope of Work; and
F. GRANTEE and LACMTA desire to amend the Existing FA as provided herein.
24 ATTACHMENT 4
FTIP#: N/A
Subregion ID: South Bay
Project ID#: MM4601.08
Amendment No. 1
FA#: 9200000000M460108
Rev: 01.29.2024 2 Measure M MSP FA Amendment
AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part II, Section 9.1 (v) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: Funds granted under this FA for allowable costs by the lapsing date. All Funds programmed for FY2022-23 and FY2023-24 are subject to lapse by June 30, 2026

2. Attachment B of the Existing FA is hereby replaced by Attachment B-1, attached.

3. Attachment C of the Existing FA is hereby replaced by Attachment C-1, attached.

4. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged. 25 FTIP#: N/A
Subregion ID: South Bay
Project ID#: MM4601.08
Amendment No. 1
FA#: 9200000000M460108
Rev: 01.29.2024 3 Measure M MSP FA Amendment
IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________ Date: ____________________ Stephanie Wiggins
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: ________________________________________ Date: ____________________ Deputy
GRANTEE:

City of Torrance
By: _______________________________________ Date: ____________________ Aram Chaparyan
Mayor
APPROVED AS TO FORM:

Patrick Q. Sullivan
City Attorney
By: _______________________________________ Date: ____________________ Galen W. Bean
Legal Counselor
ATTEST:

By: _______________________________________ Date: ____________________ Rebecca Poirier, MMC City Clerk
Ü·¹·¬¿´´§ ­·¹²»¼ ¾§æ ì¼¼è¿ì¾êó¿ïðìóìîç¿ó
ççðéóç¾ê¼ê¼»é½êçê
ÜÒæ ÝÒ ã ì¼¼è¿ì¾êó¿ïðìóìîç¿óççðéó
ç¾ê¼ê¼»é½êçê
Ü¿¬»æ îðîëòïðòðï ïêæìéæìì óðèùððù
26 SOURCES OF FUNDS FY 2024-25
Qtr 1
FY 2024-25
Qtr 2
FY 2024-25
Qtr 3
FY 2024-25
Qtr 4
FY 2025-26
Qtr 1
FY 2025-26
Qtr 2
FY 2025-26
Qtr 3
FY 2025-26
Qtr 4
TOTAL
BUDGET
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $384,087 $384,087 $768,175
Right-of-Way Acquisition $0
Construction $1,200,554 $1,200,554 $2,401,108
Vehicle Purchase $0
Others $0
Total Measure M $0 $0 $0 $0 $384,087 $384,087 $1,200,554 $1,200,554 $3,169,283 SUM PROG LACMTA FUNDS: $0 $0 $0 $0 $384,087 $384,087 $1,200,554 $1,200,554 $3,169,283 OTHER NON LACMTA FUNDING:

LOCAL: MEASURE M LR
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $42,676 $42,676 $85,352
Right-of-Way Acquisition $0
Construction $355,720 $355,720 $711,440
Vehicle Purchase $0
Others $0
Total LOCAL $0 $0 $0 $0 $42,676 $42,676 $355,720 $355,720 $796,792 STATE: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total STATE $0 $0 $0 $0 $0 $0 $0 $0 $0
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total FEDERAL $0 $0 $0 $0 $0 $0 $0 $0 $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total PRIVATE $0 $0 $0 $0 $0 $0 $0 $0 $0
SUM NON-LACMTA FUNDS : $0 $0 $0 $0 $42,676 $42,676 $355,720 $355,720 $796,792

PROJECT FUNDING
FY2022-23 and FY2023-24 $0 $0 $0 $0 $426,763 $426,763 $1,556,274 $1,556,274 $3,966,075

ATTACHMENT B - EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M - Transportation System and Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460108 Project Title: Torrance School Safety and Accessibility Program Phase 2 Project#:MM4601.08

PROGRAMMED SOURCES OF FUNDS

03.01.19 2
Measure M Funding Agreement - MSP
Attachment B - Expenditure Plan
27 ATTACHMENT B - EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure M - Transportation System and Mobility Improvements Program - Funding Agreement Projects - FA.9200000000M460108 Project Title: Torrance School Safety and Accessibility Program Phase 2 Project#:MM4601.08

PROGRAMMED SOURCES OF FUNDS
SOURCES OF FUNDS FY 2026-27
Qtr 1
FY 2026-27
Qtr 2
FY 2026-27
Qtr 3
FY 2026-27
Qtr 4
FY 2027-28
Qtr 1
FY 2027-28
Qtr 2
FY 2027-28
Qtr 3
FY 2027-28
Qtr 4
TOTAL
BUDGET
LACMTA PROGRAMMED FUNDS:

MEASURE M MSP FUNDS:

Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,556 $7,203,326 Vehicle Purchase $0
Others $0
Total Measure M $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,556 $0 $0 $7,203,326 SUM PROG LACMTA FUNDS: $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,556 $0 $0 $7,203,326 OTHER NON LACMTA FUNDING:

LOCAL: MEASURE M LR
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $355,720 $355,720
Vehicle Purchase $0
Others $0
Total LOCAL $355,720 $0 $0 $0 $0 $0 $0 $0 $355,720
STATE: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total STATE $0 $0 $0 $0 $0 $0 $0 $0 $0
FEDERAL: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total FEDERAL $0 $0 $0 $0 $0 $0 $0 $0 $0
PRIVATE: [INSERT SOURCE]
Planning Activities/Prog Dev $0
Environmental $0
Design and PS&E $0
Right-of-Way Acquisition $0
Construction $0
Vehicle Purchase $0
Others $0
Total PRIVATE $0 $0 $0 $0 $0 $0 $0 $0 $0
SUM NON-LACMTA FUNDS : $355,720 $0 $0 $0 $0 $0 $0 $0 $355,720

PROJECT FUNDINGPROJECT FUNDING
FY2024-25 and FY2025-26 $1,556,274 $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,200,556 $0 $0 $7,559,046 TOTAL LACMTA FUNDS $1,200,554 $1,200,554 $1,200,554 $1,200,554 $1,584,641 $1,584,643 $1,200,554 $1,200,554 $10,372,609 TOTAL NON-LACMTA FUNDS $355,720 $0 $0 $0 $42,676 $42,676 $355,720 $355,720 $1,152,512 TOTAL PROJECT FUNDING $1,556,274 $1,200,554 $1,200,554 $1,200,554 $1,627,317 $1,627,319 $1,556,274 $1,556,274 $11,525,121

03.01.19 2
Measure M Funding Agreement - MSP
Attachment B - Expenditure Plan
28 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.08

Amendment No. 1
Funding Agreement #: 9200000000M460108

03.01.19 1 Measure M Funding Agreement – MSP
Attachment C –1 Scope of Work
ATTACHMENT C - 1

SCOPE OF WORK

CAPITAL PROJECT
PROJECT NAME:

Torrance School Safety and Accessibility Program Phase II P
ROJECT LOCATION/LIMITS/AREA:

The project is located around three elementary schools in the City of Torrance, in the Los Angeles area.

This project limits are:

1. Edison Elementary School (Area 1): Neighborhood bounded by I-405, Ermanita Ave/I- 405, 190th St, and Prairie Ave/I- 405.

2. Victor Elementary School (Area 2): Neighborhood bounded by Del Amo Blvd, Anza Ave, Torrance Blvd, and Henrietta St.

3. Madrona Middle School (Area 3): Neighborhood bounded by Torrance Blvd, Hickory Ave, Plaza Del Amo, and Madrona Ave.

PROJECT DESCRIPTION INCLUDING MULTI-YEAR SUBREGIONAL PROGRAM AND PROJECT NEXUS:

The purpose of the project is to improve mobility, increase accessibility, and enhance safety for pedestrians and bicyclists within neighborhoods surrounding three Torrance Elementary schools by offering alternative modes of transportation. The implementation of the project will improve public health by encouraging students and families to walk and bicycle to school, reduce greenhouse gas emissions, and aid in the overall reduction of vehicular traffic congestion and conflicts with non

-
motorized users in the neighborhoods.

The need for the proposed Project is derived from increasing pedestrian and bicycle travel demand that is constrained by the existing (or lack of existing) infrastructure, and from the necessity of having safer routes to school for the children of Torrance.

SCOPE:

M
obility and accessibility will be improved by removing existing pedestrian barriers and creating a continuous active transportation network that provides a safe and continuous path of travel to the school and surrounding area.

S
afety will be improved by removing pedestrian barriers and by installing new pedestrian signal 29 FTIP #: N/A
Subregion ID: South Bay
Project#: MM4601.08

Amendment No. 1
Funding Agreement #: 9200000000M460108

03.01.19 2 Measure M Funding Agreement – MSP
Attachment C –1 Scope of Work
equipment
at critical crossing points, and new high visibility signing and striping to help alert drivers of non

-
motorized users.

The project
will also expand the bicycle network to join existing routes and bring continuity to the overall system. Bicycle amenities will also be installed at major destination points in the neighborhood to promote bicycling.

More speci
fically, the scope of work

include

s construction of new sidewalks in existing “gap” areas within the path of travel, eliminating barriers in the sidewalk infrastructure, installing pedestrian signal equipment at existing signalized intersections, installing high visibility crosswalk striping and signage at stopped controlled intersections, installing bicycle signage for new Class III bike routes, and installing new bicycle racks.

Specifi
c improvements at each school’s location are provided in the attached exhibit.

PROJEC
T FUNDING:

PHASE
LACMTA –

MEASURE M FUNDS

LOCAL AGENCY
(IF ANY) TOTAL
Design $768,175 $85,353 $853,527
Construction $8,836,260 $981,807 $9,818,066
Construction Engineerin

g
$768,175 $85,353 $853,527
TOTAL BUDGET COST $10,372,609 $1,152,512 $11,525,121
ESTIMATED PROJECT COSTS:

ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST
Engineering Design

*
1 LS $853,527 $853,527
Construction* 1 LS $9,818,066 $9,818,066
Construction Engineering, Inspection, Const. Mgmt* 1 LS $853,527 $853,527 GRAND TOTAL $11,525,121
PROJECT DETAILED SCHEDULE:

Milestones Begin End Duration
(months)
Design Edison Elementary School, Victor Elementary
School, and Madrona Elementary School improvements Apr 2025 Oct 2025 6 Construct Edison Elementary School, Victor Elementary
School, and Madrona Elementary School improvements Jan 2026 Jun 202 6 6 *Design and construct Wood Elementary School, Riviera Elementary School, and Arnold Elementary School improv
ements will require additional MM MSP funding in the future. 30 2021 Measure M Multi-Subregional Program Grant
Torrance School Safety and Accessibility Program - Phase II Project 1 (Areas 1 - 3) Scope and Estimate
Estimate Prepared By: J. Gatza and Revised By: B. Moun
Mobilization LS 1 $406,442 $406,442
Construction Surveying LS 1 $36,000 $36,000
Surveying Monuments LS 1 $72,000 $72,000
Storm Water Pollution Prevention Plan LS 1 $18,000 $18,000 NPDES Compliance LS 1 $54,000 $54,000
NPDES Permit Fee (WDID Number) ALW 1 $6,000 $6,000
Traffic Control LS 1 $180,000 $180,000
Construction Schedule Updates LS 1 $10,800 $10,800
Remove and Reconstruct PCC Sidewalk SF 199,890 $14 $2,878,416 Remove and Reconstruct ADA Handicap Curb
Access Ramp EA 238 $6,000 $1,428,000
Retrofit Existing ADA Curb Access Ramp with
Truncated Domes EA 24 $1,020 $24,480
Remove and Reconstruct PCC Curb and Gutter LF 8,508 $79 $673,845 Remove and Reconstruct PCC Driveway SF 19,701 $22 $441,392 Remove and Reconstruct PCC Cross-Gutter SF 10,851 $36 $390,642 Tree Root Pruning EA 543 $720 $391,227
Tree Removal and Stump Grind EA 440 $1,200 $528,371
Tree Replacement Planting EA 440 $840 $369,860
90-Day Plant Establishment and Maintenance
Period LS 1 $72,000 $72,000
Furnish and Install APS Push Button EA 146 $1,200 $175,200 Furnish and Install Countdown Pedestrian Signal EA 2 $1,800 $3,600 Install New High Visibility Continental Crosswalk EA 98 $1,500 $147,000 Signage Improvements LS 1 $180,000 $180,000
Furnish and Install Bicycle Parking EA 8 $3,600 $28,800 Furnish and Install Class III Bicycle Route
(Signage) MILE 4 $4,800 $19,200
$8,535,274
$1,282,792
$9,818,066
$853,527
$853,527
$11,525,121
Subtotal Construction Cost
15% Contingency
Total Construction Cost
PA&ED and PS&E, 10% of Subtotal Construction Cost
CE, 10% of Subtotal Construction Cost
Total Project 1 Cost
Item Description Unit Total Quantity Unit Price Subtotal

PROJECT

ESTIMATED COST:

31 EDISON

ELEMENTARY
190TH ST
405

INTERSTATE
405

INTERSTATE
405

INTERSTATE

YUKON AVE

PRAIRIE AVE
182ND ST

ERMANITA AVE
176TH ST
187TH ST

KORNBLUM AVE

DOTY AVE
177TH ST

DOTY AVE DOTY AVE

CORDARY AVE
TS TS

COLUMBIA PARK

CONTINUE CLASS III BICYCLE ROUTE

TO ARTESIA BOULEVARD
PREPARED BY:

J. GATZA
11/16/2021

PROPOSED CLASS III BICYCLE ROUTE
ON YUKON AVE BETWEEN 190TH ST

AND ARTESIA BLVD

PROPOSED CLASS III BICYCLE ROUTE
ON182ND ST BETWEEN PRAIRIE AVE

AND ERMANITA AVE

CONTINUE

CLASS III

BICYCLE

ROUTE TO

HAWTHORNE
BLVD
(CITY LIMIT)

EXISTING CLASS III BICYCLE ROUTE

EXISTING CLASS III BICYCLE ROUTE
182ND ST
180TH PL

PATRONELLA AVE

PATRONELLA AVE

FLORWOOD AVE

NORTH HIGH SCHOOL
TS

CITY OF TORRANCE

PUBLIC WORKS

TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM - PHASE II EDISON ELEMENTARY (AREA 1) - LOCATION MAP
LEGEND

PROPOSED ADA

CURB RAMP

IMPROVEMENT

PROPOSED

PEDESTRIAN

TRAFFIC SIGNAL

IMPROVEMENTS
TS

BOUNDARY AREA

FOR PROPOSED

PEDESTRIAN

IMPROVEMENTS

PROPOSED

CLASS III

BICYCLE ROUTE

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED BICYCLE

PARKING

PROPOSED

CROSSWALK

STRIPING

ENHANCEMENTS
SCALE:
1" = 400'
N
TS
TS
32 CITY OF TORRANCE

PUBLIC WORKS

TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM - PHASE II MADRONA ELEMENTARY (AREA 3) - LOCATION MAP
PREPARED BY:

J. GATZA
11/16/2021

HICKORY AVE

MADRONA AVE

TORRANCE BLVD MONTEREY ST

MAPLE AVE

CARSON ST

EL DORADO ST SONOMA ST

MADRONA

ELEMENTARY

CONTINUE CLASS III BICYCLE ROUTE

TO SEPULVEDA BLVD

CONTINUE CLASS III

BICYCLE ROUTE

TO CRENSHAW BLVD

TS TS TS
TS TS

PROPOSED CLASS III BICYCLE ROUTE

ON MAPLE AVE BETWEEN TORRANCE BLVD

AND SEPULVEDA BLVD

PROPOSED CLASS III

BICYCLE ROUTE

ON PLAZA DEL AMO

BETWEEN MADRONA AVE

AND CRENSHAW BLVD

EXISTING CLASS III

BICYCLE ROUTE

EXISTING CLASS II

BICYCLE LANES

PLAZA DEL AMO

KORNBLUM AVE

JUNIPER AVE

MADRONA
MARSH
LEGEND

PROPOSED ADA

CURB RAMP

IMPROVEMENT

PROPOSED

PEDESTRIAN

TRAFFIC SIGNAL

IMPROVEMENTS
TS

BOUNDARY AREA

FOR PROPOSED

PEDESTRIAN

IMPROVEMENTS

PROPOSED

CLASS III

BICYCLE ROUTE

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED BICYCLE

PARKING

PROPOSED

CROSSWALK

STRIPING

ENHANCEMENTS
TS
TS
SCALE:
1" = 400'
N
33 SCALE:
1" = 400'
PREPARED BY:

J. GATZA
11/16/2021

ANZA AVE

VICTOR ST

DEL AMO BLVD

HENRIETTA ST

TORRANCE BLVD

SPENCER ST EMERALD ST

EXISTING CLASS III BICYCLE ROUTE

EXISTING CLASS II BICYCLE LANES

EXISTING CLASS II BICYCLE LANES

EXISTING CLASS II

BICYCLE LANES

EXISTING CLASS II BICYCLE LANES (EB)

AND CLASS II BICYCLE ROUTE (WB)
VICTOR

ELEMENTARY

PROPOSED CLASS III BICYCLE ROUTE

ON HENRIETTA ST BETWEEN TORRANCE BLVD

AND DEL AMO BLVD
TS
TS
TS
TS
TS

WOOD AVE

DONORA AVE
VICTOR
PARK

GARNET STTS

WEST HIGH SCHOOL

CITY OF TORRANCE

PUBLIC WORKS

TORRANCE SCHOOLS SAFETY AND ACCESSIBILITY PROGRAM - PHASE II VICTOR ELEMENTARY (AREA 2) - LOCATION MAP
LEGEND

PROPOSED ADA

CURB RAMP

IMPROVEMENT

PROPOSED

PEDESTRIAN

TRAFFIC SIGNAL

IMPROVEMENTS
TS

BOUNDARY AREA

FOR PROPOSED

PEDESTRIAN

IMPROVEMENTS

PROPOSED

CLASS III

BICYCLE ROUTE

EXISTING BICYCLE

INFRASTRUCTURE

PROPOSED BICYCLE

PARKING

PROPOSED

CROSSWALK

STRIPING

ENHANCEMENTS
N
34

← All documents from this meeting