By: Yolanda Gomez, Planning Associate | [email protected] Subject: Planning Commission and Community Development – Conduct a Public Hearing and Adopt RESOLUTIONS to Deny the Appeal and for the Approval of a Series of Entitlements to Allow the Construction of a New Mixed-Use Development Comprised of 20 Senior Residential Apartments and 1,608 Square Feet of Commercial Space on Property Located on the East Side of Hawthorne Boulevard, Approximately 200 Feet North of Rolling Hills Road (APNs: 7547-004-010 through 7547-004-046) and Determine a Categorical Exemption from the California Environmental Quality Act (CEQA). Expenditure: None.
RECOMMENDATION
Recommendation of the Planning Commission and Community Development Director that City Council:
1. Conduct a public hearing; and
2. Deny the appeal; and
3. Adopt RESOLUTIONS for the approval of CUP21-00018 in conjunction with a Density Bonus, DVP21-00001, PRE21-00009, and DIV21-00009 to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 sq. ft. of commercial space, on property located within the R-H Overlay in the H-WT Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-010 through 7547-004-046); and
4. Determine a Categorical Exemption from the California Environmental Quality Act (CEQA); Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions).
FUNDING
None required.
DISCUSSION
Project Overview
The project applicant, Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), requests approval by the City Council to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet (sq. ft.) of commercial space, on property located within the R-H Overlay and the HBCSP-WT Zone. 1 City Council
May 19, 2026
The primary issue on appeal is whether the project addresses life and safety issues, as noted on the Appeal Form (Attachment 3). The applicant has submitted a project utilizing the State’s Density Bonus parameters and a housing development project under the State’s Housing Accountability Act, which only allows review of objective development standards. The State provides strict compliance in approving these types of projects, so long as there is no substantial evidence in the record, that the project would result in a specific adverse impact upon the public health or safety, and that there is no feasible method to mitigate or avoid the impact. The appellant contends that life and safety issues would exist if the project were approved. As discussed below, staff has determined that the specific life and safety issues mentioned in the appeal would be reviewed during the plan check process, if approved, and would not be applicable to review, in the determination of the project. Staff recommends that City Council deny the appeal and approve the subject entitlements, as conditioned.
General Plan Land Use Designation
The project site has a General Commercial (C-GEN) General Plan Land Use Designation, which is intended to permit a wide range of commercial uses. A mixed-use development is deemed consistent with the C-GEN land use designation.
Zoning Designation and Adjacent Land Uses
The project site is designated as within the R-H and in the HBCSP-WT. The project site is bound by five parcels, with only the southern parcel matching both zoning designations, and developed with a multi-tenant business office. While the other four parcels are also in the R-H, they are not zoned HBCSP-WT, but Single Family Residential (R-1), and are developed with single family residential homes.
Project Site
The project site is undeveloped with vegetation and exposed dirt. It is located on the east side of Hawthorne Boulevard, approximately 200 feet (ft.) north of the northeast corner of Hawthorne Boulevard and Rolling Hills Road. The shape of the combined seven parcels will be irregular, with a jagged contour along the south at approximately 140 ft. at its widest, which tapers to a point at the northernmost boundary. The property slopes sharply downward towards the north and northeast, providing various descending grades, with a culvert and well, at the bottom of the property, providing limited building pad area. The portion, near the street, slopes gradually downward from south to north, following the street slope and follows the curves of the street. The subject site provides a combined area of 24,635 sq. ft. (0.57 acre).
Immediately south of the subject property is the Rolling Hills Business Centre, at the northeast corner of Hawthorne Boulevard and Rolling Hills Road, which was developed circa 1999, and is a three-story commercial office development, with a parking field, immediately adjacent to the proposed site. This property is situated higher than the subject site, as Hawthorne Boulevard slopes upward from north to south and curves clockwise starting from approximately Newton Street, past the subject site, and past Rolling Hills Road to the City’s southern boundary. 2 City Council
May 19, 2026
Immediately to the north and northeast, downslope and adjacent to the subject site are single family residences, located within the R-H Overlay. The four homes on the south side of Eleda Drive were constructed in 1976, as were many homes in the tract in this vicinity. These properties are situated substantially lower than the subject site, at approximately 22-ft. below the front property line of the project, at the southernmost portion, along Hawthorne Boulevard. Eleda Drive is a cul-de-sac, west of Madison Street.
A large and steep hill, with a flat face, known as Butcher’s Hill, is located on the west side of Hawthorne Boulevard. It is at a higher elevation than the proposed site and is undeveloped with vegetation.
Housing Accountability Act Applicability
Pursuant to Government Code Section 65589.5, also known as the Housing Accountability Act (HAA), the City’s review of the revised project is limited to objective development standards as defined by local ordinance. The HAA is intended to significantly limit the ability of local agencies to disapprove, or conditionally approve, housing development projects that comply with applicable, objective general plan, zoning, and subdivision standards and criteria. It applies to housing development projects that consist of residential units and mixed-use developments when two-thirds or more of the square footage is designated for residential use. Therefore, this project qualifies as a “housing development project” under the HAA. The HAA defines objective standards as those that are measurable, clear, and do not rely on personal judgment or discretion.
In contrast, the planning and design provisions of the R-H Overlay involve subjective criteria that require interpretation, such as considerations of neighborhood compatibility and view or privacy impacts. These provisions require discretionary interpretation and are therefore not considered objective standards. Consequently, the application of the R-H Overlay provisions is superseded by the HAA.
Per the appellant’s contention, the HAA might not apply since this project depends on discretionary approvals, not objective standards. According to the Torrance Municipal Code (TMC), a series of entitlements are required to approve this project. While subjective development standards are the norm in reviewing these entitlements, based on the State’s directives, local municipalities may not review subjective development standards on projects deemed as housing development projects utilizing the HAA. The City Council has the ultimate responsibility to review these projects and determine whether they qualify under the HAA.
Density Bonus
As provided for in State Density Bonus Law (Government Code Section 65915 – 65918), the project includes a Density Bonus application with one concession and two waivers noted below.
Staff has determined the project complies with State Density Bonus Law and is entitled to receive the related benefits.
The project site is located within the HBCSP-WT Zone, which permits mixed-use developments with a base density of 27 Dwelling Units (DU)/acre. The Senior Citizen Housing Development Standard allows up to 58 DU/acre, as 750 sq. ft. of land is required per DU. The project site measures 0.57 acres, with 20 units proposed, the project provides 35 DU/acre and is less than the maximum density. Therefore, the applicant is not asking to exceed the permitted density and did not opt to exercise the density bonus portion of the law but applied for the Density Bonus to utilize State concessions and waivers. The project is providing one affordable unit (5% of 20 base density units) reserved for the very low-income level.
3 City Council
May 19, 2026
Based on the number of affordable units provided (one), the project is entitled to receive one concession, and the reduction of commercial space (less than 25% of total gross area required by the HBCSP-WT) was chosen by the applicant, at 1,608 sq. ft., which amounts to approximately seven percent of total gross area. The minimum would be 6,050 sq. ft. at 25%.
State waivers are unlimited and may be requested when existing development standards would make construction of the project physically infeasible. Each waiver request must provide justification for the need and scope of each waiver. The proposed plans provide the justification.
The applicant’s waiver requests include the following: (1) reduction in the setback adjacent to residential properties from 20-ft. to 10-ft. at the lower basement garage level required by HBCSPWT; and (2) reduction in the front yard average setback from 20-ft to 8.35-ft., and minimum dimension from 10-ft. to 6-ft., reduction in the south side yard setback from 5-ft. to 1’-6” required by the R-3 (Senior Citizen development standard). A third waiver was initially requested for height and shown on the plans; however, it was withdrawn, and a revised Waiver justification was provided by the applicant via email). Based on State Density Bonus code, section 65915, subsection (p), the applicant may combine residential guest parking with the commercial parking requirement. Previously, staff had included the sharing of guest parking as a requirement for a Conditional Use Permit (CUP) and now notes the removal of the CUP requirement for the shared parking.
It should be noted that concessions and waivers are not subject to subjective review. Per the project scope, no other concessions, incentives or waivers have been incorporated into the project.
In accordance with State Density Bonus Law, if the project is approved, the applicant will be required to record a Density Bonus Housing Agreement to memorialize the approved density bonus allowance, incentives, concessions, and/or waivers of development standards, development standards and uses, parking allowances, and any other terms and conditions relative to the project that have been included in the attached Resolutions.
Hillside Overlay
The proposed project requires approval of a Precise Plan of Development (PRE) to allow a development that exceeds the following: 0.50 Floor Area Ratio (FAR), one-story, 14-ft. in height, and may have an adverse effect on other properties in the vicinity and where there is significant public controversy. The GP designation allows a maximum FAR of 1.0 for mixed use developments.
The project provides a FAR of 0.98, is a three-story, and provides a height of 42 ft. six inches, from basement floor to top of roof.
4 City Council
May 19, 2026
Staff visited both the commercial and residential properties that contacted the City with a request for a site visit, and while staff agrees that the proposed project provides substantial impacts to view (commercial property) and light, air and privacy (residential properties), staff may not consider these impacts in their review and recommendation, as they are considered subjective and would violate the State’s law. Neither would have adverse effects on other properties related to view, light, air and privacy, and where significant public controversy exists specified in the R-H Ordinance be applicable to projects classified as HAA housing development projects. While the R-H parameters were not specified in the appeal, members of the public discussed them in previous hearings and in the correspondence attached in previous staff reports.
The City Council may approve the above project’s design and parameters via the PRE, using only objective development standards.
Life and Safety Issues
The following items were listed on the appeal form (Attachment 3), and are summarized below:
• Parking: Street (right-of-way), visitor, and delivery truck parking were specified, and referenced a lack of street parking, and the U-turn driveway entrance. Staff does not require street parking for any entitled projects. Applicants must provide on-site parking and on-site loading areas. Staff provided Conditions of Approval regarding this requirement. The project meets the parking requirements on-site, as conditioned, and as mentioned earlier, the applicant has employed a State Waiver to share the residential guest parking with the commercial parking. Therefore, staff does not deem a lack of street parking as a life and safety issue. While staff agrees that the design of the driveway entrance is not ideal, it has been reviewed by City staff and determined to be acceptable.
Therefore, it is not considered a life and safety issue. • Excavation and Construction Activities: Staff notes that a soils report and method of excavation, grading and construction will be required during the plan check process, prior to issuance of any Building or Grading Permits, should the project be approved. Plan checkers will require and review all pertinent documents and plans to satisfy all California Building Code (CBC) or other applicable regulations and requirements. As this review is done after the conceptual approval of this project, it is not currently considered a life and safety issue, during consideration of this project.
• Existing Monitoring Well and Drainage: Similar to the above response, the condition of the well and runoff/drainage will be reviewed during the plan check process, prior to issuance of any Building or Grading Permits. Therefore, this issue is not considered a life and safety issue during consideration of this project.
• Size of Project vs. Parcel Size: The project meets and/or exceeds the zoning requirements of the applicable development standards, and as mentioned in the Density Bonus paragraph, provides less than the maximum density allowed per City codes. Structural loads and calculations are not reviewed during the Planning entitlement process, but will be reviewed during the plan check process, to ensure compliance with the CBC or other applicable regulations and requirements, prior to issuance of any Building or Grading Permits. Therefore, this issue is not considered a life and safety issue during consideration of this project.
5 City Council
May 19, 2026
As summarized above, none of the items listed on the appeal form are deemed life and safety issues; additionally, no substantial evidence has been presented that the project would result in a specific adverse impact upon the public health or safety that needed to be addressed during the consideration of this project or provide resolutions. Most of the items will be addressed during the plan check process by City professionals who have this purview or are conditioned to comply with the noted department’s requirements, as indicated on the attached Resolutions (Attachment 1). Should the applicant be unable to comply with staff’s corrections during the plan check process, the project will not be issued Building or Grading Permits to proceed. Therefore, these concerns are not considered by staff in their current recommendation to the City Council, and the City Council may not review them during the consideration of this project.
Conclusion
The applicant has provided a plan that complies with most of the TMC requirements and HBCSPWT Mixed-Use Development Standards. The applicant has requested concessions and waivers of the State Density Bonus law, as previously described.
In the judgment of staff, the project is considered consistent with the HBCSP-WT zoning district, and the C-GEN land use designation, to the extent that review is permitted by the State. In addition, pursuant to the HAA, staff has determined the revised project meets the definition of a “housing development project”. Additionally, by utilizing the State’s Density Bonus laws, only objective development standards of the TMC can be applied for purposes of evaluating the revised project, and the R-H Overlay cannot be applied due to their subjective development standards. Lastly, the life and safety issues provided by the appellant are typical building/grading issues that would be addressed during the plan check process, should the proposed project be approved, and are not reviewed during the Planning entitlement process. Staff, therefore, recommends that the City Council deny the appeal and approve the project, as conditioned.
Prior Hearings and Publications
Three previous hearings were held, and all were in accordance with TMC and noticing procedures, as described below.
This project was previously scheduled to be heard by the Planning Commission at their meeting date of April 17, 2024. However, the applicant requested a continuance to continue working with Fire Department staff on access issues and the project’s layout. The Planning Commission granted an indefinite continuance, without hearing the matter, by a vote of 6-0.
This item was rescheduled and heard by the Planning Commission at their meeting date of November 19, 2025. Following public testimony and deliberation, the Commission voted (3-1) to continue the hearing indefinitely so that the applicant could provide additional information regarding the appropriate number of elevators for the project, mechanical room size, potential utility issues, and traffic concerns.
This item was rescheduled and heard by the Planning Commission at their meeting date of December 17, 2025. Following public testimony and deliberation, the Commission voted (4-1) to approve the project. A copy of the staff report, resolutions, and minutes from this meeting are included as attachments to this staff report.
6 City Council
May 19, 2026
A timely appeal by the appellant was filed on January 2, 2026. In accordance with the TMC, a notice of public hearing was made no less than 10 calendar days before the City Council meeting held on May 19, 2026, to consider an appeal of Planning Commission approval of a series of entitlements for the subject project. This notice was also posted at the project site and mailed to all registered property owners located within a 500' radius of the exterior boundaries of the project site. Additionally, a notice was published in the local newspaper (The Daily Breeze).
ENVIRONMENTAL FINDINGS
The project is deemed Categorically Exempt per CEQA Guidelines; Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions).
ATTACHMENTS
1. Resolutions for Approval
2. Location and Zoning Map
3. Appeal Filing
4. Project Plans
5. Planning Commission Meeting Minutes Excerpt (December 17, 2025, November 19, 2025, April 17, 2024)
6. Planning Commission Staff Reports and Supplemental Reports (December 17, 2025, November 19, 2025, April 17, 2024)
7. Correspondence (Post-Planning Commission Meetings)
8. Proof of Publication and Notification
7 RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TORRANCE,
CALIFORNIA, DENYING AN APPEAL AND UPHOLDING THE
PLANNING COMMISSION APPROVAL OF A CONDITIONAL USE
PERMIT, IN CONJUNCTION WITH A STATE DENSITY BONUS AND A SERIES OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 5, ARTICLE 1 OF THE TORRANCE MUNICIPAL CODE TO
ALLOW THE CONSTRUCTION OF A NEW MIXED-USE
DEVELOPMENT COMPRISED OF 20 SENIOR CITIZEN RESIDENTIAL
APARTMENTS AND 1,608 SQUARE FEET OF COMMERCIAL SPACE,
ON PROPERTY LOCATED WITHIN THE HILLSIDE OVERLAY
DISTRICT (R-H) IN THE HAWTHORNE BOULEVARD CORRIDOR
SPECIFIC PLAN-WALTERIA SUB-DISTRICT (H-WT) ON THE EAST
SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FEET
NORTH OF ROLLING HILLS ROAD.
CUP21-00018: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046); and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of CUP21- 00018 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of December 17, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of CUP21- 00018 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and 8 ATTACHMENT 1
WHEREAS, the Planning Commission on December 17, 2025, approved the project by a roll call vote of 4 to 1; and
WHEREAS, an appeal to the City Council was filed on January 2, 2026; and WHEREAS, the City Council of the City of Torrance at its meeting of May 19, 2026, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of CUP21-00018 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TORRANCE FINDS AND DETERMINES THAT:
a) The property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) The property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046); c) The proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2026 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15322 – Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) The proposed new senior citizen mixed-use development is conditionally permitted in the HWT Zone, and complies with all the applicable provisions of this Division, as conditioned; e) The proposed project, as conditioned, will not impair the integrity and character of the H-WT Zone, because residential and commercial uses are consistent with the surrounding uses in the zone and area, which include residential and commercial office uses; f) The subject site is physically suitable for the proposed use, because parking and access have been designed to meet the development standards and code, as conditioned; g) The proposed project, as conditioned, will be compatible with existing and proposed future land uses in the H-WT Zone and the general area in which the proposed project is to be located, because mixed uses are conditionally permitted and compatible with the other uses permitted and located within the zone;
h) The proposed use, as conditioned, will encourage and be consistent with the orderly development of the City as currently exists, based on the current pattern of development and 9 land uses, and the use is consistent with the General Commercial (C-GEN) General Plan designation;
i) The proposed use, as conditioned, will not discourage the appropriate existing or planned future use of the surrounding property or tenancies, because the proposed mixed uses are compatible with the existing uses and the planned future uses of the surrounding H-WT Zoned properties. The properties adjacent to the site include single family residential and commercial offices. The project, as conditioned meets and/or exceeds the objective development standards, applicable per State Density Bonus laws, related to this project; j) There will be adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development, as conditioned, is not detrimental to the public health and safety, because the project is located within an urbanized area, and the project is conditioned to enhance the existing infrastructure;
k) There will be adequate provisions for public access to serve the proposed use, because the project, as conditioned, shall provide a pedestrian walkway, driveway and on-site parking that meet objective development standards, subject to State Density Bonus law limitations; l) The location, size, design, and operating characteristics of the proposed use would not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons, located in the area, because the project, as conditioned, meets and/or exceeds the objective development standards and code requirements, subject to State Density Bonus limitations; and
m) The proposed use, as conditioned, will not produce any or all of the following results:
1. Damage or nuisance from noise, smoke, odor, dust or vibration,
2. Hazard from explosion, contamination or fire,
3. Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles.
NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF TORRANCE, AS FOLLOWS:
The application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) for approval of CUP21-00018 to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H Overlay in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, on file in the Community Development Department of the City of Torrance, is hereby APPROVED subject to the following conditions:
1. That the development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in CUP21-00018 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
10 2. That if CUP21-00018 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period of time as provided for in Section 92.27.1;
3. That all Conditions and Code requirements of Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009) shall be met; (Planning)
4. That a copy of all subject Adopted City Council Resolutions, including the Conditions of Approval, shall be copied onto the final Building Plans associated with this project, to facilitate coordination and effective implementation of all Conditions of Approval; (Planning)
5. That the revised/approved Density Bonus incentives, concessions and waivers shall be provided on the final Building Plans, prior to Building Permit issuance; (Planning)
6. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval. The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Planning)
7. That the applicant shall submit, in order to ensure with compliance with Government Code Section 65915 (c)(1)(A) (or successor statue) a Density Bonus Housing (DBH) Agreement or similar named agreement, complete with attachment and exhibits, as appropriate, to memorialize the approved density bonus allowance, incentives, concessions, waivers of development standards, parking allowances, development standards and uses, the City Monitoring Fee, and any other terms and conditions relative to the approved project. The applicant shall use the City’s DBH Agreement template and submit a draft DBH Agreement no less than 90 days prior to the anticipated date for issuance of the first Building Permit for the project, and the DBH Agreement shall be final and executed by the applicant and the City, in recordable form, prior to issuance of the first Building Permit for the project.
The DBH Agreement shall be presented to the Community Development Department and City Attorney's Office for review and approval and shall be in a form approved by the Community Development Department and City Attorney's Office, prior to issuance of the first Building Permit. The DBH Agreement may be executed by the City Manager on behalf of the City, subject to any preference of the City Manager or legal requirement for the DBH Agreement to be approved by the City Council. The applicant may request from the City a form to be used for the DBH Agreement, and the applicant shall reimburse the City for the cost of legal review. The DBH Agreement shall be executed and recorded with the County of Los Angeles Recorder prior to occupancy of units; (Planning) 11 8. That the one (1) affordable unit reserved for a very low-income household shall remain affordable for 55 years from the date of initial occupancy. The applicant, property manager, or owner shall provide an annual compliance report to the Community Development Department including tenant income verification, rent rolls, and rent calculations including utility allowances; (Planning)
9. That for purposes of defraying City monitoring activities, the property owner shall pay a City Monitoring Fee annually. The City shall invoice the owner each year. Failure to issue an invoice waives payment for that year only. The monitoring fee and reporting requirements shall be included in the DBH Agreement; (Planning)
10. That during all construction activities, the applicant or developer shall provide a toll-free hotline for complaints. The hotline shall be staffed with a live operator who can immediately contact a construction supervisor. Signs displaying the hotline number shall be posted at the site perimeter before Grading Permit issuance; (Planning)
11. That the construction site shall be secured with decorative temporary fencing, maintained throughout construction to the satisfaction of the Community Development Director; (Planning)
12. That prior to the issuance of a Building Permit, the applicant shall enter into negotiations for the formation of, participate in, or annex into, a Community Facilities District (CFD) to fund a portion of the additional costs for ongoing City services, including but not limited to, road maintenance, park maintenance, lighting, and public safety, to the satisfaction of the Community Development and Finance Directors; (Planning/Finance)
13. That a Phase I study shall be submitted, noting the status of the monitoring well/s on-site, and that their location shall be provided on the final Building Plans prior to Building Permit issuance; and that the Phase I study shall also show the mineral resources and any mitigation measures, prior to Building Permit issuance; (Planning)
14. That a site-wide signing, striping, and pavement marking plan shall be provided to distinguish guest/office and residential parking spaces, to show wayfinding and pedestrian pathway for pedestrians patronizing the office component and wayfinding for the residential component, for drive aisle/s, which includes stop/yield controls, directional signage, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits. All parking areas shall be striped with double lines (6” both sides of center, 4” wide stripes) between stalls to facilitate the movement into and out of the parking stalls; (Transportation Planning)
15. That a parking plan shall be provided showing location of garage parking, striping dimensions, backup spacing, drive aisle throating, drive aisle widths and loading spaces, and include turnaround turning templates for regular vehicles and trucks entering the site, if all parking stalls are occupied, and show regular vehicles backing out of their spaces with oncoming traffic entering the garage, to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
16. That the loading space in the garage shall be revised or relocated to meet TMC with a 14- ft. height clearance and width of 10-ft. by a depth of 25-ft.; and that the outdoor loading space be relocated or redesigned to not provide a traffic collision conflict, with truck turning 12 templates provided on the final Building Plans, prior to Building Permit issuance; (Planning)
17. That the four commercial parking spaces shall be labeled as “COMMERCIAL AND RESIDENT GUEST PARKING” on the pavement and/or other signage, as approved by the Planning Manager, and indicated on the final Building Plans, prior to Building Permit issuance; (Planning)
18. That all storage areas shall be labeled and dimensioned indicating the space size per resident’s unit on the final Building Plans, prior to Building Permit issuance; (Planning)
19. That detailed plans of the trash room shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. That if the proposed trash room inside of the garage cannot be developed, that an exterior trash enclosure/s shall be located away from street frontage, and designed, bounded on three sides by solid masonry walls and shall be equipped with solid roll-up doors, decorative trellis, concrete stress pads to reduce pavement stress, bumpers, a rainwater intrusion barrier (solid roof) to meet the current National Pollutant Discharge Elimination System (NPDES) requirements, provide receptacles for the storage and collection of trash and recyclable materials, and constructed of materials and of a design and color that are architecturally compatible with the building to the satisfaction of the Community Development Director; (Planning)
20. That details of the garage “green screen” shall be provided on the final Building Plans, prior to Building Permit issuance, to the satisfaction of the Community Development Director; (Planning)
21. That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; (Planning)
22. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view and surrounding properties by parapet walls, designed as an integral part of the façade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
23. That a complete roof plan noting the varying heights of the parapet shall be provided on the final Building Plans to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
24. That all windows/glazing fronting on Hawthorne Blvd. shall be provided with a protective film or other technology to prevent graffiti; (Planning) 13 25. That the usable common open space areas shall be specified with actual designated recreational activities and dimensioned on the final Building Plans, prior to Building Permit issuance; (Planning)
26. That elevations and details of any freestanding walls, fences, gates, railings, etc., shall be provided on the final Building Plans, and provide their individual heights, and that they shall consist of architecturally compatible materials with the building’s design, to the satisfaction of the Community Development Director; (Planning)
27. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/walls for this equipment shall be designed as an integral part of the façade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
28. That electrical transformers shall not be located within the front setback areas of Hawthorne Boulevard, and that applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the building façade and/or vegetation to the satisfaction of the Community Development Director, and shall be shown on the final Building Plans and Landscaping Plans; (Planning)
29. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
30. That the amount of landscaping area shall be indicated on the final Building Plans, prior to Building Permit issuance and shall correspond with any Landscape Plan Review (LPR) application; (Planning)
31. That the applicant shall provide landscape area/coverage calculations on the final Building Plans’ statistics, and that the amount of landscape area provides a minimum of five percent (5%) of its parking lot surface areas, per Code, to the satisfaction of the Community Development Director, and that the applicant shall continue to work with Staff on providing additional landscaping areas, and that they shall be incorporated into the final landscaping plan; (Planning)
32. That an LPR entitlement shall be required, including a landscape plan, and shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits associated with the subject project. The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant/xeriscape California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan 14 shall include the off-site parkways on Hawthorne Boulevard and shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the current State Water Efficient Landscape Ordinance; (Planning)
33. That an exterior photometric and lighting plan, in compliance with the latest California Green Code (CGC) shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits, associated with the subject project, and shall be designed to provide ratings of zero at property lines. The lighting plan shall ensure that all exterior doorways, parking spaces, and pedestrian walkways are provided with adequate illumination, security lights shall be non-glaring, all building lighting shall be properly shielded and designed to prevent excess lighting and glare onto adjacent uses and public streets, to the satisfaction of the Community Development Director; (Planning)
34. That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
35. That within 30 days of the final public hearing, the applicant shall return the City’s “Public Notice” sign and stake to Planning (provided there is no appeal); (Planning)
36. That project shall comply with Tier 1 Level Green Code requirements; (Building Regulations)
37. That a CASp Report with full compliance shall be provided, prior to final inspection; (Building Regulations)
38. That the engineer / contractor shall coordinate with the appropriate utility companies to relocate power poles which would interfere with the street improvements in the public right of way on Hawthorne Boulevard.; (Engineering)
39. That the proposed driveways on Hawthorne Blvd. shall be constructed to a commercial radius type driveway minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
40. That a minimum 10' wide level area is required behind the sidewalk before sloping down toward the subterranean garage; (Engineering)
41. That a turning template study for the proposed driveway is required to demonstrate that vehicles are able to turn into the subterranean garage. The study shall be submitted to and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit; (Engineering)
42. That a hydrology study is needed to determine the height of hike up behind the 10' wide level area behind the north driveway apron. The study shall demonstrate the public storm water which runs down Hawthorne Boulevard will not flow into the subterranean garage.
Approval of the study is required prior to issuance of Grading Permit; (Engineering)
43. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduce pressure backflow assemblies shall be located above ground on private property near the public right-of-way. Final location and access shall be approved 15 by the Community Development Department and incorporated into the on-site landscaping plan prior to Building Permit issuance; (Engineering)
44. That the project shall be supplied by master public water meter with privately owned, operated, maintained and administered submastering system for each dwelling unit per California Senate Bill 7, WOLK; (Engineering)
45. That one fire hydrant shall be installed near the proposed driveway approach; (Engineering)
46. That the applicant/developer shall design and construct 8" VCP mainline sewer and connection to existing public sewer main per public standards. The sewer plans, prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Sewer main shall be constructed prior to occupancy; (Engineering)
47. That the applicant shall submit a sewer study discussing the new development's impact on the existing downstream public sewer mains. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of a grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
48. Submit a noise attenuation plan to the satisfaction of the Environmental Division. The recommendations of the Noise Study/Noise consultant shall be adhered to and incorporated into plans submitted to the City of Torrance. Plans shall show how noise recommendations will mitigate noise, so that when completed, this use will comply with the TMC & will not disturb neighboring properties; (Environmental)
49. All signs (new, modified or revised) must be approved by the Environmental Division with appeal rights to the Planning Commission, or comply with the previously approved sign program; (Environmental)
50. Provide 9" (minimum) contrasting address numerals for non-residential uses; (Environmental)
51. Provide bike rack(s). Applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail, to the satisfaction of Environmental Division; (Environmental)
52. Guest parking stalls are reserved for guests and shall remain guest parking. Guest stalls shall be clearly marked; (Environmental)
53. Provide a mail kiosk and unit location map; (Environmental)
54. Verify 25' turning radius from jamb of garage door; (Environmental)
55. All trash shall be kept in an enclosure that is bounded on three sides by a decorative wall, decorative trellis and solid doors and shall be constructed of materials and of a design, color and texture which is architecturally compatible with the buildings and structures on the property; (Environmental)
16 56. The trash enclosure shall have a metal barrier roof covering to prevent rainwater intrusion to meet current National Pollutant Discharge Elimination System (NPDES) requirements; (Environmental)
57. Provide bins/containers within trash enclosure for the storage and retrieval of trash and recyclable materials; (Environmental)
58. Upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that project(s) are in compliance with California Building Code (CBC). All deficiencies shall be addressed to the satisfaction of the Building Official; (Grading)
59. The applicant shall continue to work with staff regarding the geotechnical report.
Geotechnical report shall be prepared per LA County soils report preparation manual, CBC, TMC and to the satisfaction of the building official; (Grading)
60. That the business name and address shall be visible from street; (Police)
61. That non-glare security lighting shall be installed for the parking lot; (Police)
62. That four-foot tall address numerals shall be painted on rooftop for aerial identification; (Police)
63. That secured property shall provide Knox Box lock access for Police and Fire, and includes any secured parking garage gates and common entry doors to the property; and (Police)
64. That a site map at entrance of multi-unit residential community or business park which identifies unit addresses and locations shall be provided, and that posting of site map/unit directory shall be provided at lobby elevator and main pedestrian entrances to expedite emergency response; (Police)
65. That the complex’s address numerals and business names shall be visible from the main fairway; (Police)
66. That all security camera footage shall be maintained in proper working order at all times, and that recorded footage shall be made available to the Torrance Police Department upon request; (Police)
67. That surveillance footage shall be stored for a minimum of sixty (60) days of parking garage, secured common and commercial area entrances and primary pedestrian walkways, and that the Torrance Police Department strongly recommends that the video surveillance system be Open Network Video Interface Forum (ONVIF) compatible; (Police)
68. That project shall provide collection for refuse, organic material and recycling per State Law State Bill 1383; (Public Works – Sanitation)
69. That all deliveries shall be made on-site and not on the street or right-of-way; and (ADDED
BY PLANNING COMMISSION)
70. That all conditions of all other City departments received prior to or during the consideration of this case by the City Council shall be met. 17 INTRODUCED, APPROVED, and ADOPTED at the regular meeting of the City of Torrance held on the 19th day of May 2026.
____________________________
Mayor George K. Chen
APPROVED AS TO FORM: ATTEST:
Patrick Q. Sullivan, City Attorney
________________________________ ____________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk
18 RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA, DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF A
DEVELOPMENT PERMIT, IN CONJUNCTION WITH A SERIES
OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 36 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSTRUCTION OF A NEW SENIOR
CITIZEN MIXED-USE DEVELOPMENT ON PROPERTY
LOCATED WITHIN THE HILLSIDE OVERLAY DISTRICT (R-H),
IN THE HAWTHORNE BOULEVARD CORRIDOR SPECIFIC
PLAN-WALTERIA SUBDISTRICT (H-WT ZONE) ON THE EAST
SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FT
NORTH OF ROLLING HILLS ROAD.
DVP21-00001: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Development Permit (DVP21-00001) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific PlanWalteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046); and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21- 00001 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road ; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of December 17, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21- 00001 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and 19 WHEREAS, the Planning Commission on December 17, 2025, approved the project by a roll call vote of 4 to 1; and
WHEREAS, an appeal to the City Council was filed on January 2, 2026; and WHEREAS, the City Council of the City of Torrance at its meeting of May 19, 2026, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21-00001 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TORRANCE FINDS AND DETERMINES THAT:
a) The property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) The property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046); c) The proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2026 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15322 – Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) The proposed senior citizen mixed-use project, as conditioned, is consistent with the purpose and requirements of the H-WT, complies with all objective applicable provisions of the Hawthorne Boulevard Corridor Specific Plan, and as conditioned, is consistent with the objectives, policies, and programs of the General Plan and with the land use designation of General Commercial (C-GEN), and objective land use code; e) The proposed development, as conditioned, conforms with all objective applicable design guidelines, design review criteria and landscaping guidelines of the Hawthorne Boulevard Corridor Specific Plan;
f) The subject site is physically suitable for the type and intensity of development, and for the types of land uses being proposed, because the project meets and/or exceeds the objective development standards;
g) By virtue of high-quality design and construction, the proposed development will positively contribute to the orderly and harmonious development of the Hawthorne Boulevard Corridor and the general welfare of the City, as conditioned, it will be implementing the objective District 20 design guidelines;
h) The proposed development will enhance the commercial development of the area, so as to increase the taxable value of real property and sales tax return to the City, and to maintain the stability and value of the property and of the Hawthorne Boulevard Corridor, as a desirable commercial area, as it will provide services to the residents and commercial businesses; i) Traffic impacts have been mitigated, in whole or in part by the design of the on-site circulation system, so as to minimize hazard and congestion, to facilitate on-site movements between adjacent properties, and to maximize opportunities for pedestrian and transit connections, via pedestrian access provision of only one curb cut on Hawthorne Boulevard, and widening the street at the site via a six-foot easement along the frontage; j) There are adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development is not detrimental to public health and safety, as the site is located in an area surrounded by urban uses;
k) The proposed development is consistent with the objectives, policies, general land uses and programs of the Torrance General Plan, as conditioned; and l) The proposed development would not be detrimental to the public interest, health, safety, convenience or welfare, as it complies with all required objective development standards, as conditioned.
NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF TORRANCE, AS FOLLOWS:
The application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) for approval of DVP21-00001 to allow the construction of a new senior citizen mixeduse development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard approximately 200 ft. north of Rolling Hills Road, on file in the Community Development Department of the City of Torrance, is APPROVED subject to the following conditions:
1. That the development and use of the subject property for a new senior citizen mixed-use development shall be subject to all conditions imposed in DVP21-00001; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
2. That if DVP21-00001 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1; and
3. That the applicants shall comply with all conditions and code requirements of CUP21-00018, PRE21-00009 and DIV21-00009.
4. That secured access for residents and “buzz in” doors or similar devices for guest access shall 21 be provided on the final Building Plans prior to Building Permit issuance to the satisfaction of the Community Development Director; (Planning)
5. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
6. That the pedestrian pathway connections made from the sidewalks along Hawthorne Boulevard to the building shall feature a decorative element, such as stamped concrete or pavers, to the satisfaction of the Community Development Director, and shall be continually maintained; (Planning)
7. That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to assure the development has a cohesive design and finish, and that the H-WT District Color of Indigo Blue (Pantone Matching System Reference #294) shall be provided in a visible location on the project’s hardware amenities, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; and (Planning)
8. That all conditions of all other City departments received prior to or during the consideration of this case by the City Council shall be met.
INTRODUCED, APPROVED, and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of May 2026.
____________________________
Mayor George K. Chen
APPROVED AS TO FORM: ATTEST:
Patrick Q. Sullivan, City Attorney
________________________________ ____________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk
22 RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA, DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF A
PRECISE PLAN OF DEVELOPMENT, IN CONJUNCTION WITH
A SERIES OF ENTITLEMENTS, AS PROVIDED FOR IN
DIVISION 9, CHAPTER 1, ARTICLE 41 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW A NEW SENIOR CITIZEN MIXEDUSE DEVELOPMENT ON PROPERTY LOCATED WITHIN THE
HILLSIDE OVERLAY DISTRICT (R-H) IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN-WALTERIA
SUBDISTRICT (H-WT ZONE) ON THE EAST SIDE OF
HAWTHORNE BOULEVARD, APPROXIMATELY 200 FEET
NORTH OF ROLLING HILLS ROAD.
PRE21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Precise Plan of Development (PRE21-00009) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific PlanWalteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046); and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of PRE21- 00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of December 17, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of PRE21- 00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and 23 WHEREAS, the Planning Commission on December 17, 2025, approved the project by a roll call vote of 4 to 1; and
WHEREAS, an appeal to the City Council was filed on January 2, 2026; and WHEREAS, the City Council of the City of Torrance at its meeting of May 19, 2026, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of PRE21-00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TORRANCE FINDS AND DETERMINES THAT:
a) The property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) The property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046); c) The proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2026 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15322 – Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) The proposed new senior citizen mixed-use project meets the definition of a “housing development project”, as provided in the Housing Accountability Act (HAA), Government Code Section 65589.5, and therefore only the objective development standards of the TMC can be applied for purposes of evaluating the proposed project; and e) The proposed project complies with the objective development standards of the R-H, as set forth in Article 41, Chapter 1, of Division 9, the R-3 Zone (Senior Citizen), as set forth in Article 7, Chapter 1, Division 9, Senior Citizen Housing Article 3, Chapter 5, of Division 9, and the HWT Zone, Article 36, Chapter 2, Division 9, of the TMC, and is consistent with the City of Torrance General Commercial (C-GEN) General Plan land use designation.
NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF TORRANCE, AS FOLLOWS:
The application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of PRE21-00009 to allow a new senior citizen mixed-use development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard, 24 approximately 200 ft. north of Rolling Hills Road, is APPROVED subject to the following conditions:
1. That the use of the subject property for a senior citizen mixed-use development shall be subject to all conditions imposed in PRE21-00009 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
2. That if this PRE21-00009 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicants shall comply with all conditions and code requirements of CUP21-00018, DVP21-00001 and DIV21-00009; (Planning)
4. That the maximum height of the addition at the highest point of the roof shall not exceed a height of 42’-6”, as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 207.50 ft. (located at the northwest corner of the garage level), based on a benchmark elevation of 178.79 ft. located within the public right-ofway near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
5. That the final height of the structure shall be certified by a licensed surveyor/engineer prior to requesting a framing or roof-sheathing inspection and shall not exceed a survey elevation of 42’-6”. for the highest ridge, based on the benchmark of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Blvd., as shown on the official survey map on file in the Community Development Department, and verifies the entire roof framing and design remains consistent with the elevation heights and roof design approved by the Planning Commission; (Planning)
6. That the maximum height of the addition at the highest point of the roof shall not exceed a height of 28’-0” at the southwest corner of the building structure (stairwell), as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 222.00 ft. (located at the southwest corner of the adjacent exterior grade), based on a benchmark elevation of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
7. That detailed plans for any proposed freestanding on-site walls, fences, gates or retaining walls shall be required, prior to Building Permit issuance; (Planning)
8. That any cabinets, storage shelves, appliances or equipment located within the garage shall be shown on the final Building Plans, and shall not encroach within the minimum interior dimensions, to the satisfaction of the Planning Manager, prior to the issuance of any Building Permits; (Planning)
25 9. That the final Building Plans shall label any fireplaces, chimneys, vents, solar panels, skylights, or any other equipment, on the elevations and roof plan, prior to Building Permit issuance, to the satisfaction of the Planning Manager; (Planning)
10. That the silhouette shall remain in place for at least 15 days through the appeal period, but no more than 45 days after the final public hearing to the satisfaction of the Planning Manager; (Planning)
11. That within 30 days of the final public hearing, the applicant shall remove the City’s "Public Notice" sign to the satisfaction of the Planning Manager; (Planning)
12. That a copy of the adopted Resolution/s for this project, including all Conditions of Approval, shall be copied onto the final Building Plans, to the satisfaction of the Planning Manager; and (Planning)
13. That all conditions of other City Departments received prior to or during the consideration of this case by the City Council shall be met.
INTRODUCED, APPROVED, and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of May 2026.
____________________________
Mayor George K. Chen
APPROVED AS TO FORM: ATTEST:
Patrick Q. Sullivan, City Attorney
________________________________ ____________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk
26 RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TORRANCE, CALIFORNIA, DENYING AN APPEAL AND
UPHOLDING THE PLANNING COMMISSION APPROVAL OF A
DIVISION OF LOT, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSOLIDATION OF SEVEN LOTS
INTO ONE LOT IN CONJUNCTION WITH A SERIES OF
ENTITLEMENTS TO ALLOW THE CONSTRUCTION A NEW
SENIOR CITIZEN MIXED-USE DEVELOPMENT ON PROPERTY
LOCATED WITHIN THE HILLSIDE OVERLAY DISTRICT (R-H) IN
THE HAWTHORNE BOULEVARD CORRIDOR SPECIFIC PLANWALTERIA SUB-DISTRICT (H-WT) ON THE EAST SIDE OF HAWTHORNE BOULEVARD, APPROXIMATELY 200 FEET
NORTH OF ROLLING HILLS ROAD.
DIV21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Division of Lot (DIV21-00009) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046); and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21- 00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of December 17, 2025, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21- 00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and 27 WHEREAS, the Planning Commission on December 17, 2025, approved the project by a roll call vote of 4 to 1; and
WHEREAS, an appeal to the City Council was filed on January 2, 2026; and WHEREAS, the City Council of the City of Torrance at its meeting of May 19, 2026, conducted a duly noticed public hearing to consider an application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21-00009 in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TORRANCE FINDS AND DETERMINES THAT:
a) The property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) The property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046); c) The proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2026 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15315, Class 15, Minor Land Division. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) The proposed Division of Lot, as conditioned, together with provision for its design and improvement, is consistent with the H-WT Zone;
e) The proposed consolidation of lots, in conjunction with the senior citizen mixed-use development project is conditionally permitted within the R-H District in the H-WT Zone; f) The site is physically suitable for the proposed type and density of development, and the subdivision to allow for lot consolidation, as conditioned, because the proposed project is conditionally permitted win the H-WT Zone, and the resulting parcel meets the development standards for size in the H-WT Zone;
g) The proposed subdivision will not interfere with the orderly development of the City, because, as conditioned, it will incorporate a high-quality design that is compatible with similar developments in the City of Torrance;
h) The subdivision, as conditioned, will not produce any or all of the following results:
• Damage or nuisance from noise, smoke, odor, dust or vibration, 28 • Hazard from explosion, contamination or fire,
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
i) The design of the development and subdivision, as conditioned, will not conflict with any public access or easements, as all means of public access are being improved.
NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF TORRANCE, AS FOLLOWS:
The application filed by ZEINA AWAD (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) for approval of DIV21-00009 to allow the consolidation of seven lots into one lot, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is APPROVED subject to the following conditions:
1. That the lot consolidation, development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in DIV21-00009; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the City Council relied in granting approval;
2. That if DIV21-00009 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That all Conditions and Code requirements of CUP21-00018, DVP21-00001 and PRE21- 00009 shall be met; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department, Engineering Division; (Engineering)
5. That a lot tie agreement shall be recorded providing that multiple lots underlying this property shall not be sold, leased, or financed separately. The lot tie agreement shall be recorded prior to granting of any Building Permits and Final Parcel Map shall be recorded prior to occupancy; and (Engineering)
6. That all conditions of all other City departments received prior to or during the consideration of this case by the City Council shall be met.
INTRODUCED, APPROVED, and ADOPTED at the regular meeting of the City Council of the City of Torrance held on the 19th day of May 2026.
____________________________
Mayor George K. Chen
APPROVED AS TO FORM: ATTEST:
Patrick Q. Sullivan, City Attorney
29 ________________________________ ____________________________ Tatia Y. Strader, Assistant City Attorney Rebecca Poirier, MMC, City Clerk 30 M
A
DIS
O
N
HAWTHORNE
BLAIR
ROLLING HILLS
WINLOCK
ELEDA
COURTNEY
CANDLEWOO
B
D
RANDY WINE
A1
A1
25500
H-WT
H-WT
25535
H-WT
H-WT
3318
R1
3655
R1
H-WT
3229
R1
3631
R1
3602
R1
3231
R1
3602
R1
3644
R1
3353
R1
3602
R1
24830
R1
3342
R1
3601
R1
3601
R1
24820
R1
3662
R1
3620
R1
3333
R1
3223
R1
3227
R1
3656
R1
24708
R1 24743
R1
24831
R1
3340
R1
3338
R1
3221
R1
3644
R1 3608
R1
3638
R1 3632
R1 3620
R1 3614
R1
3626
R1
3638
R1
3326
R1
H-WT
3650
R1
3329
R1
3614
R1
3632
R1
24712
R1
3344
R1
3332
R1
3322
R1
3607
R1
3336
R1
3352
R1
3626
R1 3620
R1 3614
R1
3348
R1
3334
R1
3608
R1
3330
R1
24835
R1
3233
R1
3608
R1
3328
R1
3649
R1
3361
R1
3357
R1
24805
R1
3625
R1 3613
R1
24827
R1
24815
R1
24809
R1
3619
R1
3643
R1
3345
R1
24716
R1
24819
R1
24808
R1
3350
R1
3607
R1
3613
R1
3619
R1
3625
R1
3631
R1
A1
24839
R1
24823
R1
3316
R1
3219
R1
3637
R1
24826
R1
24808
R1
24726
R1
24814
R1
24818
R1
24720
R1
A1
24802
R1
3312
R1
3601
R1
A1
3607
R1
3613
R1
3225
R1
24739
R1
3349
R1 3345
R1 3341
R1 3337
R1
3324
R1
3235
R1
24747
R1
24740
R1
3320
R1
3346
R1
3344
R1
3336
R1
3340
R1
3341
R1
H-WT
24734
R1
24834
R1
24735
R1
3237
R1
H-WT
24731
R1
3308
R1
3217
R1
3325
R1
H-WT
A1
3619
R1
3625
R1
24727
R1
3530
R1
H-WT
3347
R1
3637
R1
3546
R1
3643
R1
3239
R1
H-WT
A1
3649
R1
3655
R1
25550
H-WT 25550
H-WT 25550
H-WT
3520
R1
25550
H-WT
25550
H-WT
H-WT
3661
R1
25550
H-WT
25550
H-WT
3328
R1
M
A
DIS
O
N
HAWTHORNE
BLAIR
ROLLING HILLS
WINLOCK
ELEDA
COURTNEY
CANDLEWOO
B
D
RANDY WINE
A1
A1
25500
H-WT
H-WT
25535
H-WT
H-WT
3318
R1
3655
R1
H-WT
3229
R1
3631
R1
3602
R1
3231
R1
3602
R1
3644
R1
3353
R1
3602
R1
24830
R1
3342
R1
3601
R1
3601
R1
24820
R1
3662
R1
3620
R1
3333
R1
3223
R1
3227
R1
3656
R1
24708
R1 24743
R1
24831
R1
3340
R1
3338
R1
3221
R1
3644
R1 3608
R1
3638
R1 3632
R1 3620
R1 3614
R1
3626
R1
3638
R1
3326
R1
H-WT
3650
R1
3329
R1
3614
R1
3632
R1
24712
R1
3344
R1
3332
R1
3322
R1
3607
R1
3336
R1
3352
R1
3626
R1 3620
R1 3614
R1
3348
R1
3334
R1
3608
R1
3330
R1
24835
R1
3233
R1
3608
R1
3328
R1
3649
R1
3361
R1
3357
R1
24805
R1
3625
R1 3613
R1
24827
R1
24815
R1
24809
R1
3619
R1
3643
R1
3345
R1
24716
R1
24819
R1
24808
R1
3350
R1
3607
R1
3613
R1
3619
R1
3625
R1
3631
R1
A1
24839
R1
24823
R1
3316
R1
3219
R1
3637
R1
24826
R1
24808
R1
24726
R1
24814
R1
24818
R1
24720
R1
A1
24802
R1
3312
R1
3601
R1
A1
3607
R1
3613
R1
3225
R1
24739
R1
3349
R1 3345
R1 3341
R1 3337
R1
3324
R1
3235
R1
24747
R1
24740
R1
3320
R1
3346
R1
3344
R1
3336
R1
3340
R1
3341
R1
H-WT
24734
R1
24834
R1
24735
R1
3237
R1
H-WT
24731
R1
3308
R1
3217
R1
3325
R1
H-WT
A1
3619
R1
3625
R1
24727
R1
3530
R1
H-WT
3347
R1
3637
R1
3546
R1
3643
R1
3239
R1
H-WT
A1
3649
R1
3655
R1
25550
H-WT 25550
H-WT 25550
H-WT
3520
R1
25550
H-WT
25550
H-WT
H-WT
3661
R1
25550
H-WT
25550
H-WT
3328
R1
Prepared using City of Torrance Community Development Geographic Information System Michelle G. Ramirez, Community Development Director
.
CUP21-00018, DVP21-00001,
PRE21-00009, DIV21-00009
APNs: 7547-004-040 through 7547-004-046
LEGEND
Notification Area
Subject Site
LOCATION AND ZONING MAP
0 90 180 360
Feet
31 ATTACHMENT 2
32 ATTACHMENT 3
33 34
35 W:\DWGS\C0018\C0018.20 Graphics\C0018.25-SketchUp\C0018.25.B-Images\21-0520 Revised Views\21-0519 Model 23-Scene 20 copy.jpg No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) SD00 36 ATTACHMENT
4 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) PROJECT DESCRIPTION: TWO LEVELS OF TYPE V RESIDENTIAL - SENIOR APARTMENTS AND ONE LEVEL OF TYPE I CONCRETE PARKING / OFFICE ZONING SUMMARY PROJECT SITE NFORMATION APN # ADDRESS ZONE LOT AREA (SF) LOT AREA (ACRE) SETBACKS ALLOWED PROPOSED NOTES NORTH - SIDE EAST (ADJ. RESIDENTIAL) - REAR WEST (HAWTHORNE) - FRONT SOUTH - SIDE DENSITY - 58 DU / ACRE SENIOR HOUSING PLAN DESCRIPTION QUANTITY7547-004-049 EAST SIDE OF HOWTHORNE BLVD.. 210FT NORTH OF 24,635 H-WT/HS 36 DU/ACRE FLOOR AREA RATIO (F.A.R.) 0.98 NUMBER OF STORIES N/A 2 STORY + BASEMENT BUILDING HEIGHT 45' 42'-6' PARKING SUMMARY REQUIRED RESIDENTIAL PROVIDED GROSS AREA (SF) TOTAL GROSS AREA (SF) A1 1 BED / 1 BATH 15 608 9,120 PLAN DESCRIPTION 1ST LEVEL RESIDENTIAL / LOBBY / MAIL / STAIR AND CIRCULATION / OFFICE / AMENITY 2ND LEVEL GROSS AREA (SF) TOTAL OPEN SPACE COMMON OPEN SPACE PRIVATE OPEN SPACE 1,800 S.F. (90 S.F. X 20 DU) OPEN SPACE SUMMARY REQUIRED PROPOSED NOTES 1 CAR/DU 20 STALLS 25 STALLS 1 NOTES TOTAL 0.565 822 S.F. @ AMENITY SPACE SHEET INDEX ARCHITECTURE COVER SHEET 01A PROJECT SUMMARY 01B CONCESSIONS & WAIVERS - TENTATIVE PARCEL MAP (FOR REFERENCE) 02 LEVEL P-1 -BUILDING PLAN 03A LEVEL 1 - BUILDING PLAN 03B LEVEL 1 - SITE PLAN EXHIBITS 04 LEVEL 2 - BUILDING PLAN 04R ROOF PLAN 05 UNIT PLANS 06 ELEVATIONS 07 ELEVATIONS 08 SECTION 09 PERSPECTIVE VIEW 10 PERSPECTIVE VIEW 11A PERSPECTIVE VIEW 11B PERSPECTIVE VIEW - A2 2 523 1,046 PRIVATE DECK (SF) 9090 TOTAL 20 OFFICE 1 CAR / 333 SF 1,608 / 333 = 4.8 STALLS 25 STALLS 10' (AVG. OF 8.35') TOTAL UNIT SUMMARY BUILDING SUMMARY 11,050 12,050 8,562 S.F. OFFICE RESIDENTIAL 156' 20' 6' (AVG. OF 8.35') 10' OFFICE RESIDENTIAL 0' 10' 0' - -20' 0' 0' TOTAL PRIVATE DECK (SF) 1,350 180 1,800 - 42'-6' TO T.O. STAIR 11,050 200 S.F. / DU = 20 X 200 = 4,000 S.F. 5 STALLS 6,762 S.F. PROJECT TEAM: DEVELOPER NAME: ZS DEVELOPMENT CORP. ADDRESS: 11646 PRAIRIE AVE. HAWTHORNE, CA 99250 MAIL: P.O.BOX 2062 HAWTHORNE, CA 99251 CONTACT: ZEINA AWAD PHONE: 310.863.1273 EMAIL: [email protected] ARCHITECT NAME: BSB DESIGN ADDRESS: 970 WEST 190TH ST #250 TORRANCE, CA 90502 CONTACT: DIRK THELEN PHONE: 424.266.6935 FAX: 310.217.0425 EMAIL: [email protected] NUMBER OF RESIDENTIAL UNITS 32 DU 20 DU RESIDENTIAL / STAIR AND CIRCULATION / AMENITY REQUIRED 25% OF TOTAL BUILDING AREA : 24,200 X %25 = 6,050 S.F. GROSS AREA (SF) PROVIDED OFFICE AREA 1,608 S.F. TOTAL 24,200 2,350 S.F. OF SLOPED AREAS 3,590 S.F. OF FLAT AREAS ROLLING HILLS RD., TORRANCE CA CITY OF TORRANCE MUNICIPAL CODE 95.3.45 SENIOR CITIZEN HOUSING 20 STALLS HEIGHT SHALL BE MEASURED FROM THE LOWEST ADJACENT GRADE 1 DU / 750 S.F. OF LAND CITY OF TORRANCE MUNICIPAL CODE 95.3.45 SENIOR CITIZEN HOUSING 1 BED / 1 BATH GUEST PARKING 1 / 5 DU = 4 GUEST PARKING IS SHARED WITH OFFICE A3 1 BED / 1 BATH 1 704 704 90 90 P1 LEVEL LOBBY / STAIR AND CIRCULATION / BIKE STORAGE / TRASH ROOM / ELEC. ROOM 2,100 PROJECT SUMMARY A1-alt 1 BED / 1 BATH 2 590 1,180 90 180 4,000 S.F. SD01A REFER TO SHEET SD03B FOR BREAKDOWN OF COMMON OPEN SPACE AREAS. REFER TO SHEET SD03B FOR AVERAGE SETBACK CALCS. 37 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) CONCESSION & WAIVER NARRATIVE SD01B 38 ELEDA C/L DR.
(220')
(215')
(210')
(212')
(214')
(216')
(218')
(222')
(225') C/L
EXISTING P/L R=1050'
HAWTHORNE
BLVD.
ROLLING HILLS ROAD
(220')
(219)
(219)
(215)
(218)
(216)
(220')
(210')
(200')
(205')
(210')
(215')
PROPOSED LOT1
VACANT LOT
(215')
(205')
GROSS AREA=24,635 SQ. FT. NET AREA=22,561 SQ. FT.
PROPOSED P/L R=1062'
C/L R = 1000'
EXISTING POLE NEW POLE 10
11 EXISTING
SEWER LINE
SEWER LATERAL
SEWER LATERAL
AREA DRAIN
6'' PVC
STORM DRAIN
CATCH BASIN
CATCH BASIN LEGEND:
CATCH BASIN
SEWER MANHOLE
8'' PVC SEWER PIPE
6'' PVC STORM DRAIN
AREA DRAIN
SEWER MH
CITY SEWER
EASEMENT PROPOSED 8'' PVC
SEWER LINE
39 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/16" = 1'-0" 0 16 32 48 64 N 10'-0"
REAR SETBACK.
20'-0" ADJ. TO RESIDENTIAL REAR SETBACK
6'-0" EASEMENT 10'-0" SIDE SETBACK 158'-0" PROPOSED NORTH SETBACK 12'-0" EXISTING 2-STORY STRUCTURE EXISTING 2-STORY STRUCTURE EXISTING 1-STORY STRUCTURE EXISTING 2.5-STORY OFFICE BUILDING 1'-6"6'-0" SETBACK 215.00' 214.00' 220.00' 221.00' 222.00' 218.00' 216.00' 217.00' PARKING LEVEL P-1 10' SET BACK ON GROUND LEVEL PROPERTY LINE PROPOSED CURB EXISTING POLE TO BE RELOCATED EXISTING CURB NEW POLE LOCATION LANDSCAPE SIDEWALK LEGEND STAIR 1 FROM LEVEL P-1 TO LEVEL L-2 STAIR 2 FROM LEVEL L-1 TO LEVEL L-2 STAIR 3 FROM LEVEL P-1 TO LEVEL L-1 STAIR 4 FROM LEVEL L-1 TO ROOF BUILDING PLAN LEVEL P-1 SD02 EXISTING PL NEW PL STAIR 4 ELEV 1 STAIR 1 STAIR 3 LANDSCAPE F.F. 207.50' UP 10'-0" AT RESIDENTIAL LEVEL L-1 219.00' TRASH RM LOADING RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT HC HC RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT RESIDENT COMMERCIAL COMMERCIAL COMMERCIAL RESIDENT COMMERCIAL COMMERCIAL LANDSCAPE LANDSCAPE BIKE STORAGE RM ELECTRICAL / MECH RM COMMERCIAL PARKING LEVEL P-1 5 SPACES RESIDENTIAL 20 SPACES GREEN SCREEN ELEVATOR ROOM STORAGE 10' x 25' LOADING / TRASH HAWTHORNE BLVD 40 B B A A No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/16" = 1'-0" 0 16 32 48 64 N 10'-0"
REAR SETBACK.
20'-0" ADJ. TO RESIDENTIAL REAR SETBACK
6'-0" EASEMENT 10'-0" SIDE SETBACK
20'0"
ADJ. TO RESIDENTIAL
REAR SETBACK 158'-0" PROPOSED NORTH SETBACK UP DN 12'-0" EXISTING 2-STORY STRUCTURE EXISTING 2-STORY STRUCTURE EXISTING 1-STORY STRUCTURE EXISTING 2.5-STORY OFFICE BUILDING HAWTHORNE BLVD 10'-0" 6'-0" SETBACK 219.00' 215.00' 214.00' 220.00' 221.00' 222.00' 218.00' 216.00' 217.00' 10'-0 33'-0" COMMERCIAL 10' SET BACK ON GROUND LEVEL 20' SET BACK ON SECOND LEVEL 10' SET BACK PROPERTY LINE PROPOSED CURB EXISTING POLE TO BE RELOCATED EXISTING CURB NEW POLE LOCATION LANDSCAPE SIDEWALK 1,608 SF LEGEND STAIR 1 FROM LEVEL P-1 TO LEVEL L-2 STAIR 2 FROM LEVEL L-1 TO LEVEL L-2 STAIR 3 FROM LEVEL P-1 TO LEVEL L-1 STAIR 4 FROM LEVEL L-1 TO ROOF SITE PLAN LEVEL L-1 SD03A EXISTING PL NEW PL STAIR 4 ELEV 1 STAIR 1 STAIR 2 STAIR 3 LANDSCAPE F.F. 220.00' PRIVATE DECK A-2 A-1 A-1 A-1 A-1 A-1 A-1 A-1 AMENITY SPACE 411 SF F.F. 220.00' LANDSCAPE LANDSCAPE DN DN PARKING ACCESS 10' x 25' LOADING / TRASH RETAINING WALL LANDSCAPE (SINGLE TENANT; TBD) TRASH RM STO. RECREATION / FITNESS A-1 alt SINGLE TENANT COMMERCIAL SPACE, TO BE DETERMINED TRANSFORMER +/- 167'-0" EXTENT OF BLDG. POINT A 223' T.O.C. POINT B 216' T.O.C. SLOPE OF STREET: 7'-0" SLOPE PERCENTAGE: 4.2% (7' / 167') 10'-0"
41 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/16" = 1'-0" 0 16 32 48 64 N 10'-0"
REAR SETBACK.
20'-0" ADJ. TO RESIDENTIAL REAR SETBACK
6'-0" EASEMENT 10'-0" SIDE SETBACK
20'0"
ADJ. TO RESIDENTIAL
REAR SETBACK 158'-0" PROPOSED NORTH SETBACK UP DN 6'-0" EXISTING 2-STORY STRUCTURE EXISTING 2-STORY STRUCTURE EXISTING 1-STORY STRUCTURE EXISTING 2.5-STORY OFFICE BUILDING HAWTHORNE BLVD 10'-0" 6'-0" SETBACK 219.00' 215.00' 214.00' 220.00' 221.00' 222.00' 218.00' 216.00' 217.00' SITE PLAN EXHIBITS SD03B A-2 A-1 A-1 A-1 A-1 A-1 A-1 A-1 DN DN A-1 alt CALCULATION: SUM OF: (WIDTH OF A PART) X (SETBACK OF THAT PART) = (AREA A)+(AREA B)+(AREA 1)+(AREA 2)+(AREA 3)+(AREA 4)+(AREA 5) AVERAGE SETBACK CALCULATION 10'-0"
GRADE
CHANGE
OF +/- 5'
14'-0"
75'-2"
10'-9"
11'-2"
9'-9" 13'-10"
49'-2" 9'-4" (AREA 2) (AREA 1)
(AREA 3)
(AREA 4) (AREA 5)
6'-10" = (51.3x6)+(57.1x25)+(9.3x14)+(49.2x6.8)+(75.2x6)+(10.75x13.8)+(11.2x9.75) = (307.8)+(1,427.5)+(130.2)+(334.56)+(451.2)+(148.35)+(109.2) = 2,908.81 SQ. FT. MAXIMUM OF WIDTH OF BUILDING: = LOT WIDTH - REQUIRED SIDE YARDS = 358.25 - 10 = 348.25 FT AVERAGE SETBACK: = 2,908.81 / 348.25 = 8.35 FT SLOPED AREAS: 2,350 SF (COMMON) FLAT AREAS: 3,590 SF (COMMON) OPEN SPACE LEGEND AMENITY SPACE (L1&L2): 822 SF (COMMON) PRIVATE DECKS (L1&L2): 1,800 SF (PRIVATE) COMMERCIAL 1,608 SF F.F. 220.00' AMENITY SPACE 411 SF F.F. 220.00'
(SINGLE TENANT; TBD) 198'-1" 70'-4"
37'-8" GRADE CHANGE OF +/- 15'
19'-2"
142'-6"
21'-9"
10'-0"
10'-0"
34'-4" 215' 200' 1,400 SF 2,190 SF 30'-0"
11'-11" 18'-7"
12'-6" 24'-11" 29'-5" 20'-0" 380 SF 1,970 SF 210' 205' 166'-2" 57'-1" 51'-4" (AREA A) (AREA B) 25'-0" 54'-6" 6'-0" 42 B B A A No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/16" = 1'-0" 0 16 32 48 64 N 10'-0"
REAR SETBACK.
20'-0" ADJ. TO RESIDENTIAL REAR SETBACK 10'-0" SIDE SETBACK 20'0"
ADJ. TO RESIDENTIAL
REAR SETBACK 158'-0" PROPOSED NORTH SETBACK UP 12'-0" 10'-0" 10' SET BACK ON GROUND LEVEL 20' SET BACK ON SECOND LEVEL 10' SET BACK PROPERTY LINE LEGEND STAIR 1 STAIR 4 ELEV 1 STAIR 1 FROM LEVEL P-1 TO LEVEL L-2 STAIR 2 FROM LEVEL L-1 TO LEVEL L-2 STAIR 3 FROM LEVEL P-1 TO LEVEL L-1 STAIR 4 FROM LEVEL L-1 TO ROOF BUILDING PLAN LEVEL L-2 SD04 STAIR 3 A-2 A-1 A-1 A-1 A-1 alt A-1 A-1 A-1 A-1 A-1 A-3 AMENITY SPACE 411 SF F.F. 233.00' F.F. 233.00' STAIR 2 6'-0" EASEMENT6'-0" SETBACK TRASH RM STO. RECREATION / LOUNGE 43 B B A A No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/16" = 1'-0" 0 16 32 48 64 N 10'-0"
REAR SETBACK.
20'-0" ADJ. TO RESIDENTIAL REAR SETBACK 10'-0" SIDE SETBACK 20'0"
ADJ. TO RESIDENTIAL
REAR SETBACK 158'-0" PROPOSED NORTH SETBACK 12'-0" 10'-0" 10' SET BACK ON GROUND LEVEL 20' SET BACK ON SECOND LEVEL 10' SET BACK PROPERTY LINE STAIR 1 BUILDING PLAN ROOF LEVEL SD04R 6'-0" EASEMENT6'-0" SETBACK ROOF ACCESSCONDENSING UNITS WITH ISOLATION PAD TYP. ROOF MEMBRANE TRAFFIC PAD UNIT OUTLINE BELOW TYP. 44 05 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) 12 scale: 1/4" = 1'-0" 0 4 8 16 PLAN A-1 1 BEDROOM + 1 BATH GROSS AREA: 608 S.F. DECK AREA: 90 S.F. deck 11'-3" x 8'-3" living room 11'-3" x 12'-0"kitchen D/W ENTRY REF. bath W/D coat L w.i.c. bedroom 11'-10" x 10'-0" 30'-0" 12'-512" 24'-0" UNIT PLANS SD05 12'-512" 24'-0"
27'-312" 12'-512" 24'-0"
19'-412"
32'-3"
30'-0"
2'-812"
25'-812"
27'-312" 2'-812" 15'-834" 27'-114"
30'-0"
17'-116364" 30'-7" 8'-112" 27'-3" 9'-4" 9'-9" PLAN A-1 alt 1 BEDROOM + 1 BATH GROSS AREA: 590 S.F. PLAN A-2 1 BEDROOM + 1 BATH GROSS AREA: 523 S.F. DECK AREA: 90 S.F. PLAN A-3 1 BEDROOM + 1 BATH GROSS AREA: 704 S.F. DECK AREA: 90 S.F. DECK AREA: 93 S.F. deck 11'-3" x 8'-3" deck 11'-3" x 8'-3" deck 11'-1" x 8'-3" W/D W/D W/D bath bath bath D/W D/W D/W REF. REF. REF. kitchen kitchen kitchen L coat coat closet closet closet living room living / dining 11'-3" x 14'-3" living room 11'-3" x 11'-0" 11'-3" x 12'-0" bedroom 11'-10" x 10'-0" bedroom 11'-10" x 10'-0" bedroom 14'-8" x 11'-0" sto. sto. 45 06 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/8" = 1'-0" 0 8 16 24 32 N 2 1 HAWTHORNE BLVD. 1 - SOUTH ELEVATION 2 - WEST ELEVATION LEGEND VINYL WINDOW CEMENTITIOUS SIDINGS 12345 TREX RAILING STUCCO 6 METAL CANOPY METAL RAILING 7 GLASS RAILING 8 METAL FRAME 9 METAL GRILL 10 PRIVACY SCREEN 11 PRECAST CONCRETE 12 SIGNAGE LEVEL P-1 207.50' LEVEL L-1 220.0' 12'-6" LEVEL L-2 231.0' ROOF 241.0' T.O. PARAPET 244.5'10'-0" 11'-0" 3'-6" LEVEL P-1 207.50' LEVEL L-1 220.0'12'-6" LEVEL L-2 231.0' ROOF 241.0' T.O. PARAPET 244.5'10'-0" 11'-0" 3'-6" EXIST. GRADE 222.0' EXIST. GRADE 222.0' 13 METAL SIGNAGE 1415 METAL SIDING 22'-6"
TO T.O. PARAPET
28'-0" T.O. STAIR 250.0'
28'-0" T.O. STAIR 250.0' 1 1 5 10 11 4 1 7 2 2 1 9 1 6 4 5 7 METAL SCREEN AT GARAGE FOR VENTILATION 2 15 ELEVATIONS SD06 22'-6"
TO T.O. PAPAPET T.O. PARAPET 244.5' T.O. CURB 217.5'
27'-0"
TO T.O. PARAPET
37'-0"
46 07 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) scale: 1/8" = 1'-0" 0 8 16 24 32 N 4 3a HAWTHORNE BLVD. 3a - NORTH ELEVATION 4 - EAST ELEVATION 1 4 2 1 11 2 LEVEL P-1 207.50' LEVEL L-1 220.0' 12'-6" LEVEL L-2 231.0' ROOF 241.0' T.O. PARAPET 244.5'10'-0" 11'-0" 3'-6" T.O. STAIR 250.0' 37'-0"
30'-0"
24'-6" LEVEL P-1 207.50' LEVEL L-1 220.0'
12'-6" LEVEL L-2 231.0' ROOF 241.0' T.O. PARAPET 244.5'10'-0" 11'-0" 3'-6" 24'-6" 4 1 7 1 10 11 9 14 5 1 1 1 ELEVATIONS SD07 LEGEND VINYL WINDOW CEMENTITIOUS SIDINGS 12345 TREX RAILING STUCCO 6 METAL CANOPY METAL RAILING 7 GLASS RAILING 8 METAL FRAME 9 METAL GRILL 10 PRIVACY SCREEN 11 PRECAST CONCRETE 12 SIGNAGE 13 METAL SIGNAGE 1415 METAL SIDING METAL SCREEN AT GARAGE FOR VENTILATION 3b 3b - NORTH-EAST ELEV. 7 1 T.O. CURB 217.5' 27'-0"
TO T.O. PARAPET
27'-6"
TO T.O. PARAPET FIN. GRADE 217.0' T.O. PARAPET 244.5' EXISTING GRADE 210' 34'-6"
TO T.O. PARAPET T.O. PARAPET 244.5'
47 220
11'-0"
24'-6"
TOP OF PARAPET
10'-0" Top of Parapet Level L-2 Level L-1 220.00' 231.00' 241.00' Roof 244.50' 207.5 11'-0" 10'-0" 12'-6" Top of Parapet Level P-1 Level L-2 Level L-1 207.50' 220.00' 231.00' 241.00' Roof 244.50' 24'-6"
TOP OF PARAPET 220.50 215 214 213 220 218 220 205 221 211 11'-0" 10'-0" Top of Parapet12'-6" Level P-1 Level L-2 Level L-1 207.50' 220.00' 231.00' 241.00' Roof 244.50' 207.5 11'-0" 10'-0" 12'-6" Top of Parapet Level P-1 Level L-2 Level L-1 207.50' 220.00' 231.00' 241.00' Roof 244.50' 37'-0"
TOP OF PARAPET 200
23'-6"
TOP OF PARAPET
39'-6" 08 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) N A A BB 1 - BUILDING SECTION - A UNIT PARKING LEVEL P-1 10' BUILDING SETBACK PROPERTY LINE 10'-0" A-1 UNIT A-1 PRIVATE DECK PL FENCE ENTRANCE DRIVE UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 UNIT A-1 2 - BUILDING SECTION - B UNIT PARKING LEVEL P-1 20' SET BACK ON SECOND LEVEL 10' SET BACK ON GROUND LEVEL PROPERTY LINE BUILDING SETBACK EXISTING PROPERTY LINE NEW PROPERTY LINE (AFTER DEDICATION 6'-0" 12'-0" 10'-0" 20'-0" A-1 UNIT A-1 UNIT A-1 PRIVATE DECK 2:1 PL FENCE HAWTHORNE BLVD CURB GREEN SCREEN BUILDING SECTIONS SD08 scale: 1" = 10'-0" 0 10 20 30 40 48 09 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) N 1 VIEW 01 HAWTHORNE BLVD. PERSPECTIVE SD09 49 10 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) N VIEW 02 HAWTHORNE BLVD. 2 PERSPECTIVE SD10 50 11 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) N VIEW 3a HAWTHORNE BLVD. PERSPECTIVE SD11A 3a 51 11 No. MU210521 Date.09.24.2025 WALTERIA CITY OF TORRANCE - CALIFORNIA (C0018) N VIEW 3b HAWTHORNE BLVD. PERSPECTIVE SD11B 3b 52 SA. COMMUNITY DEVELOPMENT - CONDUCT A PUBLIC HEARING TO CONSIDER APPROVAL OF CUP21-0001S, DVP21-00001, PRE21-00009, DIV21-00009: ZEINA AWAD (MAHMOUD H. AWAD TRUSTEE FOR THE
MAHMOUD AND NAWAL AWAD TRUST)
Recommendation of the Community Development Director that Planning Commission conduct a public hearing for consideration of a series of entitlements to allow the construction of a new mixed-use development consisting of 20 senior citizen residential apartments and 1,608 square feet of commercial space on vacant land. The request includes a Conditional Use Permit (CUP21-00018), Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009), in conjunction with a Density Bonus, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific PlanWalteria Sub-District (HBCSP-WT) Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547- 004-046). This project is categorically exempt per California Environmental Quality Act (CEQA);Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions). (Res. No. 24-021, 24-022, 24-023, 24-024)
Continuation of hearing from November 19, 2025 Planning Commission Meeting.
Recommendation: Approval
Planning Associate Gomez introduced and presented item 8A.
Greg Tross (Newmeyer & Dillion LLP) and Dan Withee (BSB Design), representing applicant, gave a brief report on the item.
Recessed at 6:50 PM to consult City Attorney regarding members of the public speakingat tonight's meeting that previouslyspoke at the hearing on November 19,2025.
Reconvened at 7:03 PM. Roll call vote reflected 5-0; 5 Commissioners present. (Absent: Chair Kartsonis and Commissioner Turner)
Tracy Weaver, CMC
Recording Secretary
Planning Commission Meeting
December 17, 2025
2 53
ATTACHMENT 5
Members of the public that had previously spoke on November 19, 2025 may speak during the continued public hearing due to a significant change made in the project; the applicant's representative requested a change to the project by removing the conditional use permit aspect of the shared parking.
Members of the public spoke;
Dave Brent - stated the HAA is not applicable.
Joan Davidson - concerned with safety issues.
Mike Rosa - representing West Coast Capital Partners, mentioned that geotechnical reports, excavation at property line will damage their property with yielding of adjacent soils, significant shoring and monitoring will need to be done, surcharge zones within 5-ft. of property line.
Scott Douglas - concerned with public safety issues.
Vivian Lee - concerned with safety issues.
Anni Lee - concerned with possibly excavation issues.
Tom - concerned with diatomaceous earth hazards.
Christine Kobe - concerned with traffic safety.
Greg Tross (Newmeyer & Dillion LLP), representing applicant, gave a final statement and reminded the commission and public the applicant isn't responsible for members of the public speeding.
Commissioner disclosures: Commissioners Obejas, Borgialli, Anunson, and Riggs all stated they have reviewed/visited the project site and will make their decisions based on observations and evidence presented. In addition, Commissioners Borgialli and Obejas received emails via their private email addresses, these emails were submitted to staff prior to the meeting. Commissioners stated the emails will not have a bearing on their vote.
Commissioner Obejas asked the following questions of staff and the applicant; • Stated that the Commission will need to focus on objective criteria vs. subjective criteria. Commissioner Obejas concerns are trash pick-up, parking, deceleration lane, sharp turn and sidewalks.
• Asked for clarification on parking; is it still shared or not shared? Staff explained the applicant requested removal of the shared-parking/CUP aspect and that, under State Density Bonus law, the applicant can request guest residential parking that can be shared with residential parking, and guest parking is no longer required.
• Questioned the 1600 SF of space set aside for the commercial space; how many distinct units are planned at this time and asked if the City could impose a condition that there's no more units than there is commercial space? Applicant's representativeWithee, stated the space isn't leased yet and assumed likely one, maybe two tenants; staff stated the commercial parking
requirement is based on total commercial square footage, regardless of tenant count.
• Raised a question based on neighbors of the project site, West Coast Capital Partners, who stated excavation is going to be 23 ft, not 20 ft. Community 3 Tracy Weaver, CMC
Recording Secretary
Planning Commission Meeting
December 17,2025
54 Development Engineering Division, Associate Engineer Chehab, stated that redesign would need to be done, exact depth depends on conditions, but shoring can be engineered whether 20/23/25 feet (deeper can be more challenging and costly, but is feasible). Community Development Director Ramirez emphasized entitlement review is distinct from construction-plan review; detailed engineering is evaluated at plan check and stated this is not part of the Planning Commission's purview. The Planning Commission is to determine if this project meets the zoning code, meets regulations, and if the projects design has met those standards within the code. Applicant's representative added that shoring/foundations are not designed at this stage and are reviewed later. • Asked if the deceleration lane/curb lane width is adequate and is concerned with delivery trucks stopping in the lane. Public Works Engineering Manager Shi stated the curb lane is 18 ft + 6 ft dedication (24 ft) and adequate for deceleration, with driveway design still being finalized and stated the deceleration lane is not for parking. Community Development Director Ramirez noted enforcement responds when trucks stop in the travel lanes and the City can pursue compliance through the property owner.
• Asked if the balconies in the usable common space are at least 6 ft by 10ft.? Staff stated they are.
• Asked how the 28 ft. stairwell is mitigated and whether it requires a waiver? Senior Fire Prevention Specialist Rhodes responded that when egress exceeds 27 ft., truck ladder access is required; that ladder access has its own requirements and would be provided along Hawthorne Blvd, where fire access exists and also stated that the project can meet (and potentially exceed) firesafety expectations by providing a pressurized stairwell with roof access, creating protected access from the ground to the roof deck. • Questioned trash pick-up, how will it be picked up? Planning Associate Gomez explained there was not yet a finalized operational solution shown on the entitlement set and stated the applicant had indicated a loading location on the site plan. However, Planning Associate Gomez stated staff did not agree it was safe because it would require a truck to back out into the driveway, therefore, Planning Associate Gomez stated they added a condition requiring the applicant to continue working with staff to locate an appropriate loading space for trash trucks and other delivery vehicles.
• Concerned that no solution is in place for trash pick-up, asked if ensuring trash service is within the commissions scope? Planning Manager Garcia stated the applicant is allowed to retain their own trash provider. Community Development Director Ramirez explained that the Commission often approves projects with unresolved operational details by conditioning them "to the satisfaction of the Community Development Director," so the issue does not
have to be fully solved at the hearing and also noted staff cannot specify the exact truck/type of service yet because the trash company and method are not finalized, but smaller-truck solutions exist and trash service must ultimately be provided in an approved manner rather than from the street. 4 Tracy Weaver, CMC
Recording Secretary
Planning Commission Meeting
December 17, 2025
55 • Requested clarification on the applicant's fee waiver requests regarding whether a building-height waiver was required and what "revised waiver request" meant in the staff report? Planning Associate Gomez explained there are two different types of waivers that were addressed. One is a city waiver that is not required based on HA density bonus laws and the waiver staff was referring to in the staff report is the applicant's Density Bonus waiver request, which asks to waive certain City development standards/requirements as part of the density bonus entitlement.
• For further clarification, Commissioner Obejas asked about a few more key waivers; reduction of front yard setback and a 10ft. separation from the parking basement to the residential area where a 20 ft. distance is expected. Does the Commission have discretion in approving these waivers? Planning Manager Garcia explained that because the applicant requested specific waivers (and a concession) tied to the affordable unit, the city has little to no flexibility under the State Density Bonus Act and clarified further that the applicant submitted a revised waiver request that differs from what is shown on the plans, and confirmed it remains within the housing density bonus framework.
Commissioner Borgialli asked the following questions of staff and the applicant; • Stated safety is his major concern with this project. He is concerned about what the residents presented tonight during public comments. • Asked if the applicant has ever considered reducing the number of living spaces for the purpose of vehicular ingress and egress? Applicant's representative Withee stated the entrance was located purposely at the north end of the site to give more time to decelerate on Hawthorne Blvd. and more time to make the turn into the garage. Applicant's representative Tross stated it wouldn't be financially feasible, nor necessary to reduce the number of units. Stating by law they are allowed 38 units and have already reduced the number to 20 units. • Asked whether there have been any risk assessments done for insurance purposes, such as statistical outcomes, any type of iterations on accidents occurring and/or an actuary regarding trucks stopped/parked in the deceleration lane? Applicant's representative Tross stated there are laws in place to prevent this from occurring and the city has code enforcement for this situation. • Questioned to what extent should local stakeholders be penalized for higher operating expenses; such as heating, air conditioning and other utility costs due to this project? Applicant's representative Tross stated a shading analysis had been submitted as part of the record and could be addressed by staff. However, because the site has been zoned/entitled for this type of development (including up to a 45-foot building) for two decades, impacts such as loss of lighUsunlight are "subjective" and are not a basis for denial under the project's Housing Accountability AcUDensity Bonus framework. • Asked why the applicant isn't using Builder's Remedy? Applicant's representative Tross stated it's not necessary because the project meets 5 TracyWeaver,CMC
RecordingSecretary
PlanningCommissionMeeting
December17,2025
56 zoning/general plan requirements. Community Development Director Ramirez added Builder's Remedy does not apply because the city has a compliant housing element and recommended adding a condition that all deliveries be made on-site, so it is clear the property owner is responsible for ensuring delivery vehicles use on-site facilities rather than stopping in the travel/deceleration area.
• Questioned the basement/garage clearance constraint issue of 14 ft. that the applicant's architect stated would not be possible. Community Development Director Ramirez stated this kind of detailed clearance/vehicle-access requirement would be evaluated during plan check through Building & Safety, and reiterated that the Planning Commission is acting on zoning/entitlement compliance rather than construction documents.
Commissioner Yeh asked the following questions of staff and the applicant; • Asked the applicant's traffic consultant, Kay Hsu with K2 Traffic Engineering, Inc. to address the safety concerns and explain his point of view/method for "designing driveway access when downhill speeds are high and driver behavior isn't controllable." Mr. Hsu stated the driveway is on a downhill, left-hand turn on a curve, but described it as the "best curve" available for this access because the driveway remains in front of the driver as vehicles travel downhill.
He stated stopping sight distance is governed by the 45-mph speed limit, and because of the downhill condition he added 20% to the standard requirement.
He described the base requirement as roughly 300-360 feet, and with the 20% factor, the needed sight distance becomes about 432 feet, i.e., you need to be able to see to the nearby intersection to have adequate sight distance.
He concluded that adequate sight distance is provided.
• Asked specifically where the distance is measured from? Mr. Hsu stated it's measured from the center of the driveway, and tied that measurement to visibility to the nearby intersection (Rolling Hills and Hawthorne) again referencing roughly 430 feet.
• Asked if one entrance and one exit is sufficient for the project from a safety standpoint? Planning Manager Garcia stated based on staff's review (including traffic reviews) the single entrance/single exit configuration is sufficient. • Asked staff to explain the applicant's request for Density Bonus, and how the ADA situation would apply in this situation? Building and Safety Plans Examiner Torres explained that State Density Bonus law gives the applicant the right to request certain parking treatment, which the City "has no say on" in this context and for the ADA parking issue specifically, the density bonus framework allows the applicant to request that ADA parking and guest parking be counted as part of the commercial parking requirement for the project. Therefore, guest parking 6 Tracy Weaver, CMC
Recording Secretary
Planning Commission Meeting
December 17, 2025
57 is no longer required, and the prior "shared parking"/CUP concept could be removed as a project requirement
MOTION: Commissioner Obejas motioned to close the public hearing.
Commissioner Anunson seconded the motion; a roll call vote reflected 5-0 approval. (Absent: Chair Kartsonis and Commissioner Turner)
Commission Discussion; Commission gave their final comments regarding the project.
Commissioner Riggs mentioned the Commission needs to vote based on facts only and thanked the property owners for investing in the City of Torrance.
Commissioner Yeh explained to the public regarding the state density bonus law and because the applicant is providing a low-income component, the project can seek waivers/concessions, and certain local standards (including the hillside overlay) effectively do not apply in the usual way. For this reason, the Commission's discretion is constrained.
Commissioner Obejas detailed the process of reviewing and studying each project and how this process derives questions and concerns about projects, however, the commission must stay within guidelines provided by city codes and state laws.
Commissioner Borgialli stated health and safety are viable concerns and believes the state has imposed extraordinary legislation and therefore, health and safety take a back seat and become an afterthought.
Deputy City Attorney Jennifer Guerrero reminded the commission they need to base their decision on facts and evidence and refrain from speculation. You will need to look at this specific project and make a decision based on what has been presented.
Commissioner Anunson stated law has affected the 'application of the Hillside Overlay and expressed the need to contact state legislatures and let them know how these bills are affecting your neighborhoods. ;
MOTION: Commissioner Obejas moved to approve CUP21-00018, DVP21- 00001, PRE21-00009, DIV21-00009 with the condition that deliveries be made on site.
Commissioner Riggs seconded the motion; a roll call vote reflected 4-1 approval. Yes; Anunson Obejas Riggs Yeh No; Borgialli (Absent: Chair Kartsonis and Commissioner Turner)
Planning Associate Gomez read by title only Resolution No. 24-021; Resolution of the Planning Commission of the City of Torrance, California, approving a Conditional Use Permit, in conjunction with a State Density bonus and a series of entitlements, as provided for in Division 9, Chapter 5, Article 1 of the Torrance Municipal Code to allow the construction of a new mixed-use development comprised of 20 Senior Citizen Residential Apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor specific Plan-Walteria SUb-District (H-WT) on the east side of Hawthorne Boulevard approximately 200 feet of Rolling Hills Road.
Planning Associate Gomez read by title only Resolution No. 2024-022; 7 Tracy Weaver, CMC
Recording Secretary
Planning Commission Meeting
December 17, 2025
58 Resolution of the Planning Commission of the City of Torrance, California, approving a development permit, in conjunction with a series of entitlements, as provided for in Division 9, Chapter 1, Article 45 of the Torrance Municipal Code to allow the construction of a new Senior Citizen mixed-use development on property located within the R-H District, in the H-WT Zone on the east side of Hawthorne Boulevard approximately 200 ft north of Rolling Hills.
Planning Associate Gomez read by title only Resolution No. 2024-023; Resolution of the Planning Commission of the City of Torrance, California, approving a precise plan of development, in conjunction with a series of entitlements, as provided for in Division 9, Chapter 1, Article 41 of the Torrance Municipal Code to allow a new Senior Citizen mixed-use development on property located in the Hawthorne Boulevard Corridor Specific Plan on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills.
Planning Associate Gomez read by title only Resolution No. 2024-024; Resolution of the Planning Commission of the City of Torrance, California, approving a Division of Lot, as provided for in Division 9, Chapter 2, Article 29 of the Torrance Municipal Code to allow the consolidation of seven lots into one lot in conjunction with a series of entitlements to allow the construction of a new Senior Citizen mixed-use development on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills.
MOTION: Commissioner Obejas moved to adopt Resolutions Nos. 2024-021, 2024-022, 2024-023, and 2024-024. Commissioner Anunson seconded the motion; a roll call vote reflected 4-1 approval. Yes; Anunson Obejas Riggs Yeh No; Borgialli (Absent: Chair Kartsonis and Commissioner Turner)
59 8A. COMMUNITY DEVELOPMENT - CONDUCT A PUBLIC HEARING TO CONSIDER APPROVAL OF CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009: ZEINA AWAD (MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST)
Recommendation of the Community Development Director that Planning Commission conduct a public hearing for consideration of a series of entitlements to allow the construction of a new mixed-use development consisting of 20 senior citizen residential apartments and 1,608 square feet of commercial space on vacant land. The request includes a Conditional Use Permit (CUP21-00018), Development Permit (DVP21-00001), Precise Plan of Development (PRE21- 00009), and Division of Lot (DIV21-00009), in conjunction with a Density Bonus, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan Walteria Sub-District (HBCSP-WT) Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004- 046). This project is cateqorically exempt per California Environmental Quality Act (CEQA); Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions). (Res.
No. 24021,24-022,24-023, 24-024)
Recommendation: Approval
Planning Associate Gomez introduced and presented item 8A.
Greg Tross (Newmeyer & Dillion LLP) and Dan Withee (BSB Design), representing applicant, gave a brief report on the item and requested waivers David Brent, mentioned numerous environmental impacts, the number of windows is a security problem, airborne particulates during excavation.
Kevin Nakano stated there are safety issues, driveway location, line of sight with cars potentially landing on his house, if guardrail is breached.
Joan Davidson stated there is a major error on the plans, as Madison St. does not go through and dead ends, access will not be available, California law on ADA compliance will not be met.
Vivian Lee stated with one affordable unit proposed there is no commitment to housing.
Anni Lee stated she will lose privacy, security, and that cars with high speed will cause danger to her home.
Rita Nakano invited the Planning Commission to come to her home and street to view the silhouette, and stated that a blind U-turn to get into the property is proposed causing more safety hazards.
2 Tracy Weaver, CMC
Recording Secretary
Torrance Planning Commission
November 19, 2025
---------- -
60 Mike Rosa, representing West Coast Capital Partners, stated that , building mass is completely incompatible, blocks views of our tenants, traffic issues are predictable hazards.
A member of the public stated diatomaceous earth is a problem, as it does not leave the human body once absorbed.
Greg Tross and Dan Withee gave closing remarks, answered the publics concerns, and answered Commissions questions.
Vice Chair Turner - stated she has visited the site and will base her decision on the evidence presented and the safety of the community. Asked the following questions of the applicant and staff;
• Was a study done on how many response vehicles would show up during a 911 call; applicant stated he was unaware if this was reviewed and that it could be part of the traffic study. This would have be signed off and approved by the Fire Department.
• Has the applicant considered the emergency egress on Hawthorne Blvd. from the hill and considered the life safety impact on a situation that could occur at the building and what this would mean for this major intersection; applicant stated city traffic engineers looked at this and requested a six-foot-wide easement to widen the lane, vans can get into the garage, such as a paramedic emergency vehicle, however, a fire truck cannot, fire trucks will need to park on Hawthorne Blvd. Staff added that Fire Department access and turning movements were reviewed and no objections were raised.
• Questioned the guardrail, didn't see any details on the structural design of the proposed new guardrail, will this guardrail be safe enough to actually withhold a vehicle coming around the corner; applicant stated the guardrail will be installed to city standards and conditions as required for approval. • Asked what type of commercial use is planned; applicant stated office space. • Inquired about the set-backs, is it standard to waive all setbacks in their entirety; staff stated the applicant can request waivers; however, waivers can be denied if there is evidence for life safety or health concerns.
• Stated there is a vacant area near a light pole between two homes, has staff considered a better design would be to create a driveway off of that street to provide safe access to the building; staff's practice is typically not to recommend changes to plans, staff reviews what is submitted and when these plans were submitted to our traffic engineering team, they reviewed all plans and concluded that no mitigation measures were required.
• Questioned parking requirements; staff stated the project requires 20 parking spaces for the 20 senior citizen units, with 4 guest spaces and 5 spaces for the commercial component of the project. Applicant has requested that the guest and commercial spaces be shared. Applicant clarified, the parking is adequate per the state density bonus law.
• Asked everyone to consider the quality of life and air quality that this area would be subject to if this project moves forward. Feels the parking situation doesn't net out with senior citizens and the possibly of needing in home care.
Commissioner Riggs - asked the following questions of the applicant and staff; • Asked about the 6-foot set back from Hawthorne Blvd; applicant stated the traffic department felt 6 feet was adequate, this moved the property line and curb, which is what they are calling the easement, but it's really a dedication. No parking is 3 Tracy Weaver, CMC
Recording Secretary
Torrance Planning Commission
November 19, 2025
61 allowed on the property side of the street (which is still a parking lane), but with the added 6-foot set back the lane will be wider than normal. • Questioned the projects compatibility of the neighborhood; staff stated compatibility is subjective and since the project under the HAA (Housing Accountability Act), subjective standards cannot be viewed for reviewing the project. Commission must base its decision on objective standards. • Asked about environmental reports; staff stated the applicant is seeking a class 32 in-fill exemption to CEQA and staff has reviewed the technical studies which include traffic, noise, and air, staff has found the studies to be adequate. • Is there Phases 1 and 2; staff stated the project is conditioned for Phase 1 and possibly a Phase 2.
Commissioner Yeh - asked the following questions of the applicant and staff:
• Asked for clarification on the waivers request, Mr. Tross stated they applied for 2 waivers, but on the staff report it states 3 waivers were requested; staff stated initially the applicant applied for 3 waivers; however, the height waiver was not required and was removed.
• Asked a question regarding the mix-use commercial space; staff stated the applicant requested office use only, no restaurants, retail space and/or medical uses.
•
Commissioner Anunson - stated he has visited the site and will base his decision on the evidence presented. No particular questions regarding the project, however, stated he was hoping speakers would have given suggestions as to what should go on the site if they are opposed to the project, but none were given.
Deputy City Attorney Guerrero stated to the Commission that this is a HAA (Housing Accountability Act) project and therefore the commission must look at the factors of this project objectively. Vice Chair's comments regarding the quality of life, that is a subjective standard, the commission must look at the objective standards. If the commission denies the project, specific findings of fact to support the denial will need to be made.
Vice Chair Turner stated she understood, however, the impact would objectively impact the quality of access to Hawthorne Blvd., to the surrounding residents and to the commercial building above the site.
Applicant stated they have provided soils and technical reports which show the potential impacts the project will have on the property and staff has determined that there are no significant impacts to the environment. At the end of the day, the project is a Class 32 infill development plan.
MOTION: Commissioner Riggs moved to close the public hearing. Commissioner Yeh seconded the motion; a roll call vote reflected 4-0 approval. (Recused: Chair Kartsonis and
Absent: Commissioners Borgialli and Obejas)
Commission Discussion:
CommissionerYeh - stated the commission is mostly concerned with safety and feels the commissionhas the authority to look further into the project to make sure residents are safe.
Commissioner Riggs - stated this is tough situation and safety is a major concern in this area; especially due to speeding down from the hill. Great job of the city employees.
Commissioner Anunson - stated if the commission turns this project down, the commission will need a point-by-point reason for doing so. It will make denial difficult to prove. 4 Tracy Weaver, CMC
Recording Secretary
Torrance Planning Commission
November 19, 2025
62 MOTION: Commissioner Yeh moved to deny CUP21-00018, DVP21-00001, PRE21- 00009, DIV21-00009. Vice-Chair Turner seconded the motion. No vote was taken; Vice Chair Turner made a substitute motion.
Discussion amongst Commission and staff continued.
Planning Manager Garcia reminded the commission that if this body is going to move forward denying this project, it will need to make specific adverse impacts. That means a significant quantifiable, direct and unavoidable impact based on objective identified written public health or safety standards. This is just not voting to deny the project; the findings will need be substantive and needed tonight.
Commissioner Yeh asked if the motion is to approve and the commission doesn't' pass the motion, will they still need to provide the substantive findings? Deputy City Attorney suggested a recess in order to research and confirm procedurally what needs to be done.
MOTION: Commissioner Yeh moved to take a recess at 7:55 PM. Commissioner Riggs seconded the motion; a roll call vote reflected 4-0 approval. (Recused: Chair Kartsonis and
Absent: Commissioners Borgialli and Obejas)
Chair Turner called the meeting back to order at 8:05 PM.
Roll Call vote reflected 4-0; the following commissioners were present; Anunson, Riggs, Yeh and Chair Turner. (Recused: Chair Kartsonis and Absent: Commissioners Borgialli and Obejas)
Vice Chair Turner asked staff to report on the findings discovered during recess.
Planning Manager Garcia stated in response to the motion to deny, which is a pending motion, the commission will need to provide factual information as to why the commission is denying the project; this means to state adverse impacts, significant impacts, and unavoidable impacts based on objective, identified public health and welfare, most of what the commission has stated as concerns related to safety is mostly related to traffic and this is not part of the project. Reminded the commission staff has reviewed the technical study in relation to the traffic analysis, this has been signed off on and is adequate. This has been done for noise and other technical studies as well. The review has been done and professional staff has no objections.
If the commission still wished to deny the project, commission will need to provide definitive findings for the denial.
Deputy City Attorney Guerrero reiterated the appropriate city departments have reviewed the project and have found the project to acceptable. If the commission denies the project, the denial needs to be tied to facts or code that can be placed in a resolution. Once the resolution is written, it will be brought back to the commission for approval.
Planning Manager Garcia stated the applicants do not want a continuance.
Deputy City Attorney Guerrero stated if the commission's basis for denial is due to lack of facts, then the more appropriate action would be to continue the hearing.
MOTION: Vice Chair Turner motioned to continue the hearing to an unspecified date based on insufficient information to make a decision. Commissioner Yeh seconded the motion; a roll call vote reflected 3-1 approval. Yes; Anunson Yeh and Turner No; Riggs (Recused: Chair Kartsonis and Absent: Commissioners Borgialli and Obejas) 5 Tracy Weaver, CMC
Recording Secretary
Torrance Planning Commission
November 19, 2025
63 For the motion; it was suggested the following items need more clarification; electrical service, mechanical room size and civil public utilities (how these would be rerouted or utilized without impacting neighboring buildings).
Commissioners were advised utility and engineering aren't the purview of the commission, these reviews occur after Planning Commission's approval. Once the project moves from the Planning Commission it will then go through plan check, grading review, and other departments, including the utility companies for permitting. This review occurs post land use entitlements approvals.
64 65
AGENDA ITEM NO. 8A
DATE: December 17, 2025
TO: Planning Commission
FROM: Yolanda Gomez, Planning Associate
SUBJECT: East side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road
Conditional Use Permit (CUP21-00018)
Development Permit (DVP21-00001)
Precise Plan of Development (PRE21-00009)
Division of Lot (DIV21-00009)
Consideration of a series of entitlements to allow the construction of a new mixeduse development comprised of 20 senior residential apartments and 1,608 square feet (sq. ft.) of commercial space. The request includes a Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus, Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009), on property located within the Hillside and Local Coastal Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria District (HBCSP-WT) Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046).
RECOMMENDATION
Recommendation of the Community Development Director that Planning Commission conduct a public hearing and consider adoption of Resolutions Nos. 24-021, 24-022, 24-023, and 24-024 for approval of CUP21-00018 in conjunction with a Density Bonus, DVP21-00001, PRE21-00009, and DIV21-00009 to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 sq. ft. of commercial space, on property located within the R-H Overlay in the HBCSP-WT Zone, and determine a Categorical Exemption for the project in accordance with the California Environmental Quality Act (CEQA); Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions).
Background/Previous Hearings
The project was previously scheduled on the April 17, 2024, Planning Commission agenda; however, the applicant requested a continuance to continue working with Fire Department staff on access issues and the project’s layout. The Planning Commission granted an indefinite continuance on April 17, 2024, without hearing the matter.
This item was rescheduled and heard on the November 19, 2025, Planning Commission agenda.
The Commission was composed of four members (Commissioners Anunson, Riggs, Turner, and Yeh), with two excused absences (Commissioners Borgialli and Obejas) and one recusal (Chairman Kartsonis). After approximately two hours of public testimony and discussion, the Commission motioned to continue the hearing indefinitely, in order to obtain additional information regarding the number of elevators that should be provided, mechanical room size, potential utility issues and traffic concerns. The continuance was approved by a vote of 3 – 1 (Commissioner Riggs).
1 66
ATTACHMENT 6
Attached are the previous two staff reports and supplemental report for your review.
The Draft Minutes of the Planning Commission hearing of November 19, 2025, were not available, prior to the release of this report.
Attached, please find additional public correspondence received during and after the November 19, 2025, hearing, prior to the release of the current staff report.
Staff continues to recommend approval of the project, as conditioned.
ATTACHMENTS
1. Planning Commission Resolution Nos. 24-021, 24-022, 24-023, 24-024
2. Staff Reports and Supplemental Reports for the November 19, 2025, and April 24, 2024, Planning Commission hearings
3. Correspondence
2 67
ITEM 8A
ATTACHMENT 1
Planning Commission Resolution Nos. 24-021, 24-022, 24-023, 24-024 ITEM 8A
ATTACHMENT 1
3 68
PLANNING COMMISSION RESOLUTION NO. 24-021
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF TORRANCE, CALIFORNIA, APPROVING A CONDITIONAL
USE PERMIT, IN CONJUNCTION WITH A STATE DENSITY
BONUS AND A SERIES OF ENTITLEMENTS, AS PROVIDED FOR
IN DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A NEW
MIXED-USE DEVELOPMENT COMPRISED OF 20 SENIOR
CITIZEN RESIDENTIAL APARTMENTS AND 1,608 SQUARE FEET
OF COMMERCIAL SPACE, ON PROPERTY LOCATED WITHIN
THE HILLSIDE OVERLAY DISTRICT (R-H) IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN-WALTERIA SUBDISTRICT (H-WT) ON THE EAST SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FEET NORTH OF ROLLING
HILLS ROAD.
CUP21-00018: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs:
7547-004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Conditional Use Permit in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547- 004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and 4 69
WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of December 17, 2025, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Conditional Use Permit in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547- 004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines for Implementation, Article 19, Section 15332, Class 32, infill development projects are declared categorically exempt; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2025 Guidelines for Implementation of the CEQA, Article 19, Section 15322 – Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) That the proposed new senior citizen mixed-use development is conditionally permitted in the H-WT Zone, and complies with all the applicable provisions of this Division, as conditioned;
e) That the proposed project, as conditioned, will not impair the integrity and character of the H-WT Zone, because residential and commercial uses are consistent with the surrounding uses in the zone and area, which include residential and commercial 5 70
office uses;
f) That the subject site is physically suitable for the proposed use, because parking and access have been designed to meet the development standards and code, as conditioned;
g) That the proposed project, as conditioned, will be compatible with existing and proposed future land uses in the H-WT Zone and the general area in which the proposed project is to be located, because mixed uses are conditionally permitted and compatible with the other uses permitted and located within the zone; h) That the proposed use, as conditioned, will encourage and be consistent with the orderly development of the City as currently exists, based on the current pattern of development and land uses, and the use is consistent with the General Commercial (C-GEN) General Plan designation;
i) That the proposed use, as conditioned, will not discourage the appropriate existing or planned future use of the surrounding property or tenancies, because the proposed mixed uses are compatible with the existing uses and the planned future uses of the surrounding H-WT Zoned properties. The properties adjacent to the site include single family residential and commercial offices. The project, as conditioned meets and/or exceeds the objective development standards, applicable per State Density Bonus laws, related to this project;
j) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development, as conditioned, is not detrimental to the public health and safety, because the project is located within an urbanized area, and the project is conditioned to enhance the existing infrastructure; k) That there will be adequate provisions for public access to serve the proposed use, because the project, as conditioned, shall provide a pedestrian walkway, driveway and on-site parking that meet objective development standards, subject to State Density Bonus law limitations;
l) That the location, size, design, and operating characteristics of the proposed use would not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons, located in the area, because the project, as conditioned, meets and/or exceeds the objective development standards and code requirements, subject to State Density Bonus limitations; and m) That the proposed use, as conditioned, will not produce any or all of the following results:
1. Damage or nuisance from noise, smoke, odor, dust or vibration,
2. Hazard from explosion, contamination or fire,
3. Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles.
6 71
WHEREAS, the Planning Commission by the following roll call vote APPROVED CUP21-00018, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that CUP21-00018, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the RH Overlay in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in CUP21-00018 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if this Conditional Use Permit is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period of time as provided for in Section
92.27.1;
3. That all Conditions and Code requirements of Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009) shall be met; (Planning)
4. That a copy of all subject Adopted Planning Commission Resolutions, including the Conditions of Approval, shall be copied onto the final Building Plans associated with this project, to facilitate coordination and effective implementation of all Conditions of Approval; (Planning)
5. That the revised/approved Density Bonus incentives, concessions and waivers shall be provided on the final Building Plans, prior to Building Permit issuance; (Planning) 7 72
6. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval.
The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Planning)
7. That the applicant shall submit, in order to ensure with compliance with Government Code Section 65915 (c)(1)(A) (or successor statue) a Density Bonus Housing Agreement or similar named agreement, complete with attachment and exhibits, as appropriate, to memorialize the approved density bonus allowance, incentives, concessions, waivers of development standards, parking allowances, development standards and uses, the City Monitoring Fee, and any other terms and conditions relative to the approved project. The applicant shall submit a draft Density Bonus Housing Agreement (DBH Agreement) no less than 90 days prior to the anticipated date for issuance of the first Building Permit for the project, and the DBH Agreement shall be final and executed by the applicant and the City, in recordable form, prior to issuance of the first Building Permit for the project. The DBH Agreement shall be presented to the Community Development Department and City Attorney's Office for review and approval and shall be in a form approved by the Community Development Department and City Attorney's Office, prior to issuance of the first Building Permit.
The DBH Agreement may be executed by the City Manager on behalf of the City, subject to any preference of the City Manager or legal requirement for the DBH Agreement to be approved by the City Council. The applicant may request from the City a form to be used for the DBH Agreement, and the applicant shall reimburse the City for the cost of legal review. The DBH Agreement shall be executed and recorded with the County of Los Angeles Recorder prior to occupancy of units; (Planning)
8. That the one (1) affordable unit reserved for a very low-income household shall remain affordable for 55 years from the date of initial occupancy. The applicant, property manager, or owner shall provide an annual compliance report to the Community Development Department including tenant income verification, rent rolls, and rent calculations including utility allowances; (Planning)
9. That for purposes of defraying City monitoring activities, the property owner shall pay a City Monitoring Fee annually. The City shall invoice the owner each year. Failure to issue an invoice waives payment for that year only. The monitoring fee and reporting requirements shall be included in the DBH Agreement; (Planning) 8 73
10.That during all construction activities, the applicant or developer shall provide a tollfree hotline for complaints. The hotline shall be staffed with a live operator who can immediately contact a construction supervisor. Signs displaying the hotline number shall be posted at the site perimeter before Grading Permit issuance; (Planning)
11.That the construction site shall be secured with decorative temporary fencing, maintained throughout construction to the satisfaction of the Community Development Director; (Planning)
12.That prior to the issuance of a Building Permit, the applicant shall enter into negotiations for the formation of, participate in, or annex into, a Community Facilities District (CFD) to fund a portion of the additional costs for ongoing City services, including but not limited to, road maintenance, park maintenance, lighting, and public safety, to the satisfaction of the Community Development and Finance Directors; (Planning/Finance)
13.That a Phase I study shall be submitted, noting the status of the monitoring well/s onsite, and that their location shall be provided on the final Building Plans prior to Building Permit issuance; and that the Phase I study shall also show the mineral resources and any mitigation measures, prior to Building Permit issuance; (Planning)
14.That a site-wide signing, striping, and pavement marking plan shall be provided to distinguish guest/office and residential parking spaces, to show wayfinding and pedestrian pathway for pedestrians patronizing the office component and wayfinding for the residential component, for drive aisle/s, which includes stop/yield controls, directional signage, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits. All parking areas shall be striped with double lines (6” both sides of center, 4” wide stripes) between stalls to facilitate the movement into and out of the parking stalls; (Transportation Planning)
15.That a parking plan shall be provided showing location of garage parking, striping dimensions, backup spacing, drive aisle throating, drive aisle widths and loading spaces, and include turnaround turning templates for regular vehicles and trucks entering the site, if all parking stalls are occupied, and show regular vehicles backing out of their spaces with oncoming traffic entering the garage, to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
16.That the loading space in the garage shall be revised or relocated to meet TMC with a 14-ft. height clearance and width of 10-ft. by a depth of 25-ft.; and that the outdoor loading space be relocated or redesigned to not provide a traffic collision conflict, with truck turning templates provided on the final Building Plans, prior to Building Permit issuance; (Planning)
17.That the four commercial parking spaces shall be labeled as “COMMERCIAL AND RESIDENT GUEST PARKING” on the pavement and/or other signage, as approved 9 74
by the Planning Manager, and indicated on the final Building Plans, prior to Building Permit issuance; (Planning)
18.That all storage areas shall be labeled and dimensioned indicating the space size per resident’s unit on the final Building Plans, prior to Building Permit issuance; (Planning)
19.That detailed plans of the trash room shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. That if the proposed trash room inside of the garage cannot be developed, that an exterior trash enclosure/s shall be located away from street frontage, and designed, bounded on three sides by solid masonry walls and shall be equipped with solid roll-up doors, decorative trellis, concrete stress pads to reduce pavement stress, bumpers, a rainwater intrusion barrier (solid roof) to meet the current National Pollutant Discharge Elimination System (NPDES) requirements, provide receptacles for the storage and collection of trash and recyclable materials, and constructed of materials and of a design and color that are architecturally compatible with the building to the satisfaction of the Community Development Director; (Planning)
20.That details of the garage “green screen” shall be provided on the final Building Plans, prior to Building Permit issuance, to the satisfaction of the Community Development Director; (Planning)
21.That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; (Planning)
22.That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view and surrounding properties by parapet walls, designed as an integral part of the façade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
23.That a complete roof plan noting the varying heights of the parapet shall be provided on the final Building Plans to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
24.That all windows/glazing fronting on Hawthorne Blvd. shall be provided with a protective film or other technology to prevent graffiti; (Planning) 1075
25.That the usable common open space areas shall be specified with actual designated recreational activities and dimensioned on the final Building Plans, prior to Building Permit issuance; (Planning)
26.That elevations and details of any freestanding walls, fences, gates, railings, etc., shall be provided on the final Building Plans, and provide their individual heights, and that they shall consist of architecturally compatible materials with the building’s design, to the satisfaction of the Community Development Director; (Planning)
27.That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/walls for this equipment shall be designed as an integral part of the façade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
28.That electrical transformers shall not be located within the front setback areas of Hawthorne Boulevard, and that applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the building façade and/or vegetation to the satisfaction of the Community Development Director, and shall be shown on the final Building Plans and Landscaping Plans; (Planning)
29.That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
30.That the amount of landscaping area shall be indicated on the final Building Plans, prior to Building Permit issuance and shall correspond with any LPR application; (Planning)
31.That the applicant shall provide landscape area/coverage calculations on the final Building Plans’ statistics, and that the amount of landscape area provides a minimum of five percent (5%) of its parking lot surface areas, per Code, to the satisfaction of the Community Development Director, and that the applicant shall continue to work with Staff on providing additional landscaping areas, and that they shall be incorporated into the final landscaping plan; (Planning)
32.That a Landscape Plan Review (LPR) entitlement shall be required, including a landscape plan, and shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits associated with the subject project. The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant/xeriscape California friendly vegetation, shade-producing 1176
trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Hawthorne Boulevard and shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the current State Water Efficient Landscape Ordinance; (Planning)
33.That an exterior photometric and lighting plan, in compliance with the latest California Green Code (CGC) shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits, associated with the subject project, and shall be designed to provide ratings of zero at property lines. The lighting plan shall ensure that all exterior doorways, parking spaces, and pedestrian walkways are provided with adequate illumination, security lights shall be non-glaring, all building lighting shall be properly shielded and designed to prevent excess lighting and glare onto adjacent uses and public streets, to the satisfaction of the Community Development Director; (Planning)
34.That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
35.That within 30 days of the final public hearing, the applicant shall return the City’s “Public Notice” sign and stake to Planning (provided there is no appeal); (Planning)
36.That project shall comply with Tier 1 Level Green Code requirements; (Building Regulations)
37.That a CASp Report with full compliance shall be provided, prior to final inspection; (Building Regulations)
38.That the engineer / contractor shall coordinate with the appropriate utility companies to relocate power poles which would interfere with the street improvements in the public right of way on Hawthorne Boulevard.; (Engineering)
39.That the proposed driveways on Hawthorne Blvd. shall be constructed to a commercial radius type driveway minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
40.That a minimum 10' wide level area is required behind the sidewalk before sloping down toward the subterranean garage; (Engineering)
1277
41.That a turning template study for the proposed driveway is required to demonstrate that vehicles are able to turn into the subterranean garage. The study shall be submitted to and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit; (Engineering)
42.That a hydrology study is needed to determine the height of hike up behind the 10' wide level area behind the north driveway apron. The study shall demonstrate the public storm water which runs down Hawthorne Boulevard will not flow into the subterranean garage. Approval of the study is required prior to issuance of Grading Permit; (Engineering)
43.That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduce pressure backflow assemblies shall be located above ground on private property near the public right-of-way. Final location and access shall be approved by the Community Development Department and incorporated into the onsite landscaping plan prior to Building Permit issuance; (Engineering)
44.That the project shall be supplied by master public water meter with privately owned, operated, maintained and administered submastering system for each dwelling unit per California Senate Bill 7, WOLK; (Engineering)
45.That one fire hydrant shall be installed near the proposed driveway approach; (Engineering)
46.That the applicant/developer shall design and construct 8" VCP mainline sewer and connection to existing public sewer main per public standards. The sewer plans, prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Sewer main shall be constructed prior to occupancy; (Engineering)
47.That the applicant shall submit a sewer study discussing the new development's impact on the existing downstream public sewer mains. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of a grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
48.Submit a noise attenuation plan to the satisfaction of the Environmental Division. The recommendations of the Noise Study/Noise consultant shall be adhered to and incorporated into plans submitted to the City of Torrance. Plans shall show how noise recommendations will mitigate noise, so that when completed, this use will comply with the TMC & will not disturb neighboring properties; (Environmental) 1378
49.All signs (new, modified or revised) must be approved by the Environmental Division with appeal rights to the Planning Commission, or comply with the previously approved sign program; (Environmental)
50.Provide 9" (minimum) contrasting address numerals for non-residential uses; (Environmental)
51.Provide bike rack(s). Applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail, to the satisfaction of Environmental Division; (Environmental)
52.Guest parking stalls are reserved for guests and shall remain guest parking. Guest stalls shall be clearly marked; (Environmental)
53.Provide a mail kiosk and unit location map; (Environmental)
54.Verify 25' turning radius from jamb of garage door; (Environmental)
55.All trash shall be kept in an enclosure that is bounded on three sides by a decorative wall, decorative trellis and solid doors and shall be constructed of materials and of a design, color and texture which is architecturally compatible with the buildings and structures on the property; (Environmental)
56.The trash enclosure shall have a metal barrier roof covering to prevent rainwater intrusion to meet current NPDES requirements; (Environmental)
57.Provide bins/containers within trash enclosure for the storage and retrieval of trash and recyclable materials; (Environmental)
58.Upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that project(s) are in compliance with California Building Code (CBC).
All deficiencies shall be addressed to the satisfaction of the Building Official; (Grading)
59.The applicant shall continue to work with staff regarding the geotechnical report.
Geotechnical report shall be prepared per LA County soils report preparation manual, CBC, TMC and to the satisfaction of the building official; (Grading)
60.That the business name and address shall be visible from street; (Police)
61.That non-glare security lighting shall be installed for the parking lot; (Police)
62.That four-foot tall address numerals shall be painted on rooftop for aerial identification; (Police)
1479
63.That secured property shall provide Knox Box lock access for Police and Fire, and includes any secured parking garage gates and common entry doors to the property; and (Police)
64.That a site map at entrance of multi-unit residential community or business park which identifies unit addresses and locations shall be provided, and that posting of site map/unit directory shall be provided at lobby elevator and main pedestrian entrances to expedite emergency response; (Police)
65.That the complex’s address numerals and business names shall be visible from the main fairway; (Police)
66.That all security camera footage shall be maintained in proper working order at all times, and that recorded footage shall be made available to the Torrance Police Department upon request; (Police)
67.That surveillance footage shall be stored for a minimum of sixty (60) days, of parking garage, secured common and commercial area entrances and primary pedestrian walkways, and that the Torrance Police Department strongly recommends that the video surveillance system be Open Network Video Interface Forum (ONVIF) compatible; (Police)
68.That project shall provide collection for refuse, organic material and recycling per State Law SB1383; and (Public Works – Sanitation)
69.That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 17
th day of December 2025.
__________________________________
Chairman, Torrance Planning Commission
ATTEST:
__________________________________
Secretary, Torrance Planning Commission
1580
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 17
th day of December 2025, by the following roll
call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
1681
PLANNING COMMISSION RESOLUTION NO. 2024-022
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
TORRANCE, CALIFORNIA, APPROVING A DEVELOPMENT PERMIT, IN
CONJUNCTION WITH A SERIES OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9, CHAPTER 1, ARTICLE 45 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSTRUCTION OF A NEW SENIOR CITIZEN
MIXED-USE DEVELOPMENT ON PROPERTY LOCATED WITHIN THE R-H
DISTRICT, IN THE H-WT ZONE ON THE EAST SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FT NORTH OF ROLLING HILLS ROAD.
DVP21-00001: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Development Permit (DVP21-00001) in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547- 004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21-00001 in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on December 17, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21-00001 in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the 1782
provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC); and WHEREAS, in fill development is categorically exempt by the 2025 Guidelines of Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15332, Class 32; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed senior citizen mixed-use project, as conditioned, is consistent with the purpose and requirements of the H-WT, complies with all objective applicable provisions of the Hawthorne Boulevard Corridor Specific Plan, and as conditioned, is consistent with the objectives, policies, and programs of the General Plan and with the land use designation of General Commercial (C-GEN), and objective land use code; d) That the proposed development, as conditioned, conforms with all objective applicable design guidelines, design review criteria and landscaping guidelines of the Hawthorne Boulevard Corridor Specific Plan;
e) That the subject site is physically suitable for the type and intensity of development, and for the types of land uses being proposed, because the project meets and/or exceeds the objective development standards;
f) That by virtue of high-quality design and construction, the proposed development will positively contribute to the orderly and harmonious development of the Hawthorne Boulevard Corridor and the general welfare of the City, as conditioned, it will be implementing the objective District design guidelines;
g) That the proposed development will enhance the commercial development of the area, so as to increase the taxable value of real property and sales tax return to the City, and to maintain the stability and value of the property and of the Hawthorne Boulevard Corridor, as a desirable commercial area, as it will provide services to the residents and commercial businesses;
h) That traffic impacts have been mitigated, in whole or in part by the design of the on-site circulation system, so as to minimize hazard and congestion, to facilitate on-site movements between adjacent properties, and to maximize opportunities for pedestrian and transit connections, via pedestrian access provision of only one curb cut on Hawthorne Boulevard, and widening the street at the site via a six-foot easement along the frontage;
i) That there are adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development is not detrimental to public health and safety, 1883
as the site is located in an area surrounded by urban uses; j) That the proposed development is consistent with the objectives, policies, general land uses and programs of the Torrance General Plan, as conditioned; k) That the proposed development would not be detrimental to the public interest, health, safety, convenience or welfare, as it complies with all required objective development standards, as conditioned; and
l) That the proposed development meets the requirements of the CEQA, under Categorical Exemptions Section 15322.
WHEREAS, the Planning Commission by the following roll call vote APPROVED DVP21-00001, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that DVP21-00001 filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to allow the construction of a new senior citizen mixed-use development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard approximately 200 ft. north of Rolling Hills Road, on file in the Community Development Department of the City of Torrance, is hereby approved subject to the following conditions:
1. That the development and use of the subject property for a new senior citizen mixed-use development shall be subject to all conditions imposed in Planning Commission case DVP21-00001; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DVP21-00001 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1; and
3. That the applicants shall comply with all conditions and code requirements of CUP21- 00018, PRE21-00009 and DIV21-00009.
4. That secured access for residents and “buzz in” doors or similar devices for guest access 1984
shall be provided on the final Building Plans prior to Building Permit issuance to the satisfaction of the Community Development Director; (Planning)
5. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
6. That the pedestrian pathway connections made from the sidewalks along Hawthorne Boulevard to the building shall feature a decorative element, such as stamped concrete or pavers, to the satisfaction of the Community Development Director, and shall be continually maintained; (Planning)
7. That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to assure the development has a cohesive design and finish, and that the H-WT District Color of Indigo Blue (Pantone Matching System Reference #294) shall be provided in a visible location on the project’s hardware amenities, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; and (Planning)
8. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 17
th day of December 2025.
__________________________________
Chairmen, Torrance Planning Commission
ATTEST:
__________________________________
Secretary, Torrance Planning Commission
2085
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 17
th day of December 2025, by the following roll
call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
2186
PLANNING COMMISSION RESOLUTION NO. 2024-023
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA, APPROVING A PRECISE
PLAN OF DEVELOPMENT, IN CONJUNCTION WITH A SERIES
OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 1, ARTICLE 41 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW A NEW SENIOR CITIZEN MIXED-USE
DEVELOPMENT ON PROPERTY LOCATED WITHIN THE
HILLSIDE OVERLAY DISTRICT IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN ON THE EAST SIDE
OF HAWTHORNE BOULEVARD, APPROXIMATELY 200 FEET
NORTH OF ROLLING HILLS ROAD.
PRE21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Precise Plan of Development (PRE21-00009) in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547- 004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Precise Plan of Development in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the HWT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and
WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on December 17, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Precise Plan of Development in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H2287 WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1, Article 41 of the TMC; and WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed construction of a new senior citizen mixed-use project, as conditioned, is Categorically Exempt by the 2025 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15322; d) That the proposed new senior citizen mixed-use project meets the definition of a “housing development project”, as provided in the Housing Accountability Act (HAA), Government Code Section 65589.5, and therefore only the objective development standards of the TMC can be applied for purposes of evaluating the proposed project; and e) That the proposed project complies with the objective development standards of the RH, as set forth in Article 41, Chapter 1, of Division 9, the R-3 Zone (Senior Citizen), as set forth in Article 7, Chapter 1, Division 9, Senior Citizen Housing Article 3, Chapter 5, of Division 9, and the H-WT Zone, Article 36, Chapter 2, Division 9, of the TMC, and is consistent with the City of Torrance General Commercial (C-GEN) General Plan land use designation.
WHEREAS, the Planning Commission by the following roll call vote APPROVED PRE21-00009, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that PRE21-00009, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), to allow a new 2388
senior citizen mixed-use development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 ft. north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the use of the subject property for a senior citizen mixed-use development shall be subject to all conditions imposed in PRE21-00009 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section
92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if this PRE21-00009 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicants shall comply with all conditions and code requirements of CUP21- 00018, DVP21-00001 and DIV21-00009; (Planning)
4. That the maximum height of the addition at the highest point of the roof shall not exceed a height of 42’-6”, as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 207.50 ft. (located at the northwest corner of the garage level), based on a benchmark elevation of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
5. That the final height of the structure shall be certified by a licensed surveyor/engineer prior to requesting a framing or roof-sheathing inspection and shall not exceed a survey elevation of 42’-6”. for the highest ridge, based on the benchmark of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Blvd., as shown on the official survey map on file in the Community Development Department, and verifies the entire roof framing and design remains consistent with the elevation heights and roof design approved by the Planning Commission; (Planning)
6. That the maximum height of the addition at the highest point of the roof shall not exceed a height of 28’-0” at the southwest corner of the building structure (stairwell), as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 222.00 ft. (located at the southwest corner of the adjacent exterior grade), based on a benchmark elevation of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
2489
7. That detailed plans for any proposed freestanding on-site walls, fences, gates or retaining walls shall be required, prior to Building Permit issuance; (Planning)
8. That any cabinets, storage shelves, appliances or equipment located within the garage shall be shown on the final Building Plans, and shall not encroach within the minimum interior dimensions, to the satisfaction of the Planning Manager, prior to the issuance of any Building Permits; (Planning)
9. That the final Building Plans shall label any fireplaces, chimneys, vents, solar panels, skylights, or any other equipment, on the elevations and roof plan, prior to Building Permit issuance, to the satisfaction of the Planning Manager; (Planning)
10. That the silhouette shall remain in place for at least 15 days through the appeal period, but no more than 45 days after the final public hearing to the satisfaction of the Planning Manager; (Planning)
11. That within 30 days of the final public hearing, the applicant shall remove the City’s "Public Notice" sign to the satisfaction of the Planning Manager; (Planning)
12. That a copy of the adopted Resolution/s for this project, including all Conditions of Approval, shall be copied onto the final Building Plans, to the satisfaction of the Planning Manager; and (Planning)
13. That all conditions of other City Departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 17
th day of December 2025.
__________________________________
Chairman, Torrance Planning Commission
ATTEST:
__________________________________
Secretary, Torrance Planning Commission
2590
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 17
th day of December 2025, by the following roll
call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
2691
PLANNING COMMISSION RESOLUTION NO. 2024-024
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF TORRANCE, CALIFORNIA, APPROVING A
DIVISION OF LOT, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSOLIDATION OF SEVEN LOTS
INTO ONE LOT IN CONJUNCTION WITH A SERIES OF
ENTITLEMENTS TO ALLOW THE CONSTRUCTION A NEW
SENIOR CITIZEN MIXED-USE DEVELOPMENT ON
PROPERTY LOCATED WITHIN THE HILLSIDE OVERLAY
DISTRICT (R-H) IN THE HAWTHORNE BOULEVARD
CORRIDOR SPECIFIC PLAN-WALTERIA SUB-DISTRICT
(H-WT) ON THE EAST SIDE OF HAWTHORNE
BOULEVARD, APPROXIMATELY 200 FEET NORTH OF
ROLLING HILLS ROAD.
DIV21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Division of Lot (DIV21-00009) to allow the consolidation of seven lots into one lot, in conjunction with series of entitlements, to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs:
7547-004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21-00009 to allow the consolidation of seven lots into one lot, in conjunction with series of entitlements, to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, the Planning Commission on November 19, 2025, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on December 17, 2025, to consider an application filed by Zeina Awad (Mahmoud 2792
H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21-00009 to allow the consolidation of seven lots into one lot, in conjunction with series of entitlements, to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines for Implementation, Article 19, Section 15315, Class 15, Minor Land Division projects are declared categorically exempt; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed Division of Lot, as conditioned, together with provision for its design and improvement, is consistent with the H-WT Zone;
d) That the proposed consolidation of lots, in conjunction with the senior citizen mixeduse development project is conditionally permitted within the R-H District in the H-WT Zone;
e) That the site is physically suitable for the proposed type and density of development, and the subdivision to allow for lot consolidation, as conditioned, because the proposed project is conditionally permitted win the H-WT Zone, and the resulting parcel meets the development standards for size in the H-WT Zone; f) That the proposed subdivision will not interfere with the orderly development of the City, because, as conditioned, it will incorporate a high-quality design that is compatible with similar developments in the City of Torrance; g) That the subdivision request is categorically exempt per the CEQA, 2025 Guidelines for Implementation, Article 19, Section 15315, Class 15, Minor Land Division; h) That the subdivision, as conditioned, will not produce any or all of the following results:
• Damage or nuisance from noise, smoke, odor, dust or vibration, • Hazard from explosion, contamination or fire,
2893
• Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
i) That the design of the development and subdivision, as conditioned, will not conflict with any public access or easements, as all means of public access are being improved.
WHEREAS, the Planning Commission by the following roll call vote APPROVED DIV21-00009, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that DIV21-00009, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to approve a Division of Lot in conjunction with series of entitlements to allow the consolidation of seven lots into one lot, in conjunction with the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the lot consolidation, development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in DIV21- 00009; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DIV21-00009 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That all Conditions and Code requirements of CUP21-00018, DVP21-00001 and PRE21-00009 shall be met; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department, Engineering Division; (Engineering)
2994
5. That a lot tie agreement shall be recorded providing that multiple lots underlying this property shall not be sold, leased, or financed separately. The lot tie agreement shall be recorded prior to granting of any Building Permits and Final Parcel Map shall be recorded prior to occupancy; and (Engineering)
6. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 17
th day of December 2025.
__________________________________
Chairman, Torrance Planning Commission
ATTEST:
__________________________________
Secretary, Torrance Planning Commission
3095
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 17
th day of December 2025, by the following roll
call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
3196
ITEM 8A
ATTACHMENT 2
Staff Reports and Supplemental Reports for the November 19, 2025 and April 24, 2024 Planning Commission Hearings
ITEM 8A
ATTACHMENT 2
3297
AGENDA ITEM NO. 8A (SUPPLEMENTAL NO. 1)
DATE: November 19, 2025
TO: Planning Commission
FROM: Yolanda Gomez, Planning Associate
SUBJECT: East side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road
Conditional Use Permit (CUP21-00018)
Development Permit (DVP21-00001)
Precise Plan of Development (PRE21-00009)
Division of Lot (DIV21-00009)
Consideration of a series of entitlements to allow the construction of a new mixeduse development comprised of 20 senior residential apartments and 1,608 square feet (sq. ft.) of commercial space. The request includes a Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus, Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009), on property located within the Hillside and Local Coastal Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria District (HBCSP-WT) Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046).
SUPPLEMENTAL
Please find attached correspondence from City of Torrance Engineering Division staff, received after distribution of the meeting agenda and staff report. The documents provide information on deleting Condition No. 46 from the Conditional Use Permit Resolution and Code Requirement No. 8 from Division of Lot. Correspondingly, Planning staff is attaching a revised Conditional Use Permit Resolution and revised Code Requirements document.
Additionally, please find attached additional correspondence received from the Los Angeles County Sanitation District.
Lastly, please find attached additional public correspondence received prior to 5PM Tuesday, the day before the hearing (November 18, 2025).
Staff continues to recommend approval of the project, as conditioned.
ATTACHMENTS
1. Revised Planning Commission Resolution No. 24-021
2. Revised Code Requirements
3. Engineering Division Email and Memorandum
4. LA County Sanitation District Email and Comment Letter
5. Public Correspondence
3398
ITEM 8A
ATTACHMENT 1
Revised Planning Commission Resolution No. 24-021
ITEM 8A
ATTACHMENT 1
3499
PLANNING COMMISSION RESOLUTION NO. 24-021
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF TORRANCE, CALIFORNIA, APPROVING A CONDITIONAL
USE PERMIT, IN CONJUNCTION WITH A STATE DENSITY
BONUS AND A SERIES OF ENTITLEMENTS, AS PROVIDED FOR
IN DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A NEW
MIXED-USE DEVELOPMENT COMPRISED OF 20 SENIOR
CITIZEN RESIDENTIAL APARTMENTS AND 1,608 SQUARE FEET
OF COMMERCIAL SPACE, ON PROPERTY LOCATED WITHIN
THE HILLSIDE OVERLAY DISTRICT (R-H) IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN-WALTERIA SUBDISTRICT (H-WT) ON THE EAST SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FEET NORTH OF ROLLING
HILLS ROAD.
CUP21-00018: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs:
7547-004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Conditional Use Permit in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547- 004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, due and legal publication of notice was given to owners of property in 35 100
the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines for Implementation, Article 19, Section 15332, Class 32, infill development projects are declared categorically exempt; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2025 Guidelines for Implementation of the CEQA, Article 19, Section 15322 – Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) That the proposed new senior citizen mixed-use development is conditionally permitted in the H-WT Zone, and complies with all the applicable provisions of this Division, as conditioned;
e) That the proposed project, as conditioned, will not impair the integrity and character of the H-WT Zone, because residential and commercial uses are consistent with the surrounding uses in the zone and area, which include residential and commercial office uses;
f) That the subject site is physically suitable for the proposed use, because parking and access have been designed to meet the development standards and code, as conditioned;
g) That the proposed project, as conditioned, will be compatible with existing and proposed future land uses in the H-WT Zone and the general area in which the proposed project is to be located, because mixed uses are conditionally permitted and compatible with the other uses permitted and located within the zone; h) That the proposed use, as conditioned, will encourage and be consistent with the orderly development of the City as currently exists, based on the current pattern of 36 101
development and land uses, and the use is consistent with the General Commercial (C-GEN) General Plan designation;
i) That the proposed use, as conditioned, will not discourage the appropriate existing or planned future use of the surrounding property or tenancies, because the proposed mixed uses are compatible with the existing uses and the planned future uses of the surrounding H-WT Zoned properties. The properties adjacent to the site include single family residential and commercial offices. The project, as conditioned meets and/or exceeds the objective development standards, applicable per State Density Bonus laws, related to this project;
j) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development, as conditioned, is not detrimental to the public health and safety, because the project is located within an urbanized area, and the project is conditioned to enhance the existing infrastructure; k) That there will be adequate provisions for public access to serve the proposed use, because the project, as conditioned, shall provide a pedestrian walkway, driveway and on-site parking that meet objective development standards, subject to State Density Bonus law limitations;
l) That the location, size, design, and operating characteristics of the proposed use would not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons, located in the area, because the project, as conditioned, meets and/or exceeds the objective development standards and code requirements, subject to State Density Bonus limitations; and m) That the proposed use, as conditioned, will not produce any or all of the following results:
1. Damage or nuisance from noise, smoke, odor, dust or vibration,
2. Hazard from explosion, contamination or fire,
3. Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles.
WHEREAS, the Planning Commission by the following roll call vote APPROVED CUP21-00018, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that CUP21-00018, filed by Zeina Awad 37 102
(Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the RH Overlay in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in CUP21-00018 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if this Conditional Use Permit is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period of time as provided for in Section
92.27.1;
3. That all Conditions and Code requirements of Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009) shall be met; (Planning)
4. That a copy of all subject Adopted Planning Commission Resolutions, including the Conditions of Approval, shall be copied onto the final Building Plans associated with this project, to facilitate coordination and effective implementation of all Conditions of Approval; (Planning)
5. That the revised/approved Density Bonus incentives, concessions and waivers shall be provided on the final Building Plans, prior to Building Permit issuance; (Planning)
6. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval.
The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is 38 103
successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Planning)
7. That the applicant shall submit, in order to ensure with compliance with Government Code Section 65915 (c)(1)(A) (or successor statue) a Density Bonus Housing Agreement or similar named agreement, complete with attachment and exhibits, as appropriate, to memorialize the approved density bonus allowance, incentives, concessions, waivers of development standards, parking allowances, development standards and uses, the City Monitoring Fee, and any other terms and conditions relative to the approved project. The applicant shall submit a draft Density Bonus Housing Agreement (DBH Agreement) no less than 90 days prior to the anticipated date for issuance of the first Building Permit for the project, and the DBH Agreement shall be final and executed by the applicant and the City, in recordable form, prior to issuance of the first Building Permit for the project. The DBH Agreement shall be presented to the Community Development Department and City Attorney's Office for review and approval and shall be in a form approved by the Community Development Department and City Attorney's Office, prior to issuance of the first Building Permit.
The DBH Agreement may be executed by the City Manager on behalf of the City, subject to any preference of the City Manager or legal requirement for the DBH Agreement to be approved by the City Council. The applicant may request from the City a form to be used for the DBH Agreement, and the applicant shall reimburse the City for the cost of legal review. The DBH Agreement shall be executed and recorded with the County of Los Angeles Recorder prior to occupancy of units; (Planning)
8. That the one (1) affordable unit reserved for a very low-income household shall remain affordable for 55 years from the date of initial occupancy. The applicant, property manager, or owner shall provide an annual compliance report to the Community Development Department including tenant income verification, rent rolls, and rent calculations including utility allowances; (Planning)
9. That for purposes of defraying City monitoring activities, the property owner shall pay a City Monitoring Fee annually. The City shall invoice the owner each year. Failure to issue an invoice waives payment for that year only. The monitoring fee and reporting requirements shall be included in the DBH Agreement; (Planning)
10.That during all construction activities, the applicant or developer shall provide a tollfree hotline for complaints. The hotline shall be staffed with a live operator who can immediately contact a construction supervisor. Signs displaying the hotline number shall be posted at the site perimeter before Grading Permit issuance; (Planning)
11.That the construction site shall be secured with decorative temporary fencing, maintained throughout construction to the satisfaction of the Community Development Director; (Planning)
12.That prior to the issuance of a Building Permit, the applicant shall enter into negotiations for the formation of, participate in, or annex into, a Community Facilities 39 104
District (CFD) to fund a portion of the additional costs for ongoing City services, including but not limited to, road maintenance, park maintenance, lighting, and public safety, to the satisfaction of the Community Development and Finance Directors; (Planning/Finance)
13.That a Phase I study shall be submitted, noting the status of the monitoring well/s onsite, and that their location shall be provided on the final Building Plans prior to Building Permit issuance; and that the Phase I study shall also show the mineral resources and any mitigation measures, prior to Building Permit issuance; (Planning)
14.That a site-wide signing, striping, and pavement marking plan shall be provided to distinguish guest/office and residential parking spaces, to show wayfinding and pedestrian pathway for pedestrians patronizing the office component and wayfinding for the residential component, for drive aisle/s, which includes stop/yield controls, directional signage, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits. All parking areas shall be striped with double lines (6” both sides of center, 4” wide stripes) between stalls to facilitate the movement into and out of the parking stalls; (Transportation Planning)
15.That a parking plan shall be provided showing location of garage parking, striping dimensions, backup spacing, drive aisle throating, drive aisle widths and loading spaces, and include turnaround turning templates for regular vehicles and trucks entering the site, if all parking stalls are occupied, and show regular vehicles backing out of their spaces with oncoming traffic entering the garage, to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
16.That the loading space in the garage shall be revised or relocated to meet TMC with a 14-ft. height clearance and width of 10-ft. by a depth of 25-ft.; and that the outdoor loading space be relocated or redesigned to not provide a traffic collision conflict, with truck turning templates provided on the final Building Plans, prior to Building Permit issuance; (Planning)
17.That the four commercial parking spaces shall be labeled as “COMMERCIAL AND RESIDENT GUEST PARKING” on the pavement and/or other signage, as approved by the Planning Manager, and indicated on the final Building Plans, prior to Building Permit issuance; (Planning)
18.That all storage areas shall be labeled and dimensioned indicating the space size per resident’s unit on the final Building Plans, prior to Building Permit issuance; (Planning)
19.That detailed plans of the trash room shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. That if the proposed trash room inside of the garage cannot be developed, that an exterior trash enclosure/s shall be located away from street frontage, and designed, bounded on three sides by solid masonry walls and shall be equipped with solid roll-up doors, decorative trellis, concrete stress pads to reduce pavement stress, bumpers, a 40 105
rainwater intrusion barrier (solid roof) to meet the current National Pollutant Discharge Elimination System (NPDES) requirements, provide receptacles for the storage and collection of trash and recyclable materials, and constructed of materials and of a design and color that are architecturally compatible with the building to the satisfaction of the Community Development Director; (Planning)
20.That details of the garage “green screen” shall be provided on the final Building Plans, prior to Building Permit issuance, to the satisfaction of the Community Development Director; (Planning)
21.That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; (Planning)
22.That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view and surrounding properties by parapet walls, designed as an integral part of the façade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
23.That a complete roof plan noting the varying heights of the parapet shall be provided on the final Building Plans to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
24.That all windows/glazing fronting on Hawthorne Blvd. shall be provided with a protective film or other technology to prevent graffiti; (Planning)
25.That the usable common open space areas shall be specified with actual designated recreational activities and dimensioned on the final Building Plans, prior to Building Permit issuance; (Planning)
26.That elevations and details of any freestanding walls, fences, gates, railings, etc., shall be provided on the final Building Plans, and provide their individual heights, and that they shall consist of architecturally compatible materials with the building’s design, to the satisfaction of the Community Development Director; (Planning)
27.That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/walls for this equipment shall be designed as an integral part of 41 106
the façade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
28.That electrical transformers shall not be located within the front setback areas of Hawthorne Boulevard, and that applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the building façade and/or vegetation to the satisfaction of the Community Development Director, and shall be shown on the final Building Plans and Landscaping Plans; (Planning)
29.That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
30.That the amount of landscaping area shall be indicated on the final Building Plans, prior to Building Permit issuance and shall correspond with any LPR application; (Planning)
31.That the applicant shall provide landscape area/coverage calculations on the final Building Plans’ statistics, and that the amount of landscape area provides a minimum of five percent (5%) of its parking lot surface areas, per Code, to the satisfaction of the Community Development Director, and that the applicant shall continue to work with Staff on providing additional landscaping areas, and that they shall be incorporated into the final landscaping plan; (Planning)
32.That a Landscape Plan Review (LPR) entitlement shall be required, including a landscape plan, and shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits associated with the subject project. The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant/xeriscape California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Hawthorne Boulevard and shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the current State Water Efficient Landscape Ordinance; (Planning)
42 107
33.That an exterior photometric and lighting plan, in compliance with the latest California Green Code (CGC) shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits, associated with the subject project, and shall be designed to provide ratings of zero at property lines. The lighting plan shall ensure that all exterior doorways, parking spaces, and pedestrian walkways are provided with adequate illumination, security lights shall be non-glaring, all building lighting shall be properly shielded and designed to prevent excess lighting and glare onto adjacent uses and public streets, to the satisfaction of the Community Development Director; (Planning)
34.That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
35.That within 30 days of the final public hearing, the applicant shall return the City’s “Public Notice” sign and stake to Planning (provided there is no appeal); (Planning)
36.That project shall comply with Tier 1 Level Green Code requirements; (Building Regulations)
37.That a CASp Report with full compliance shall be provided, prior to final inspection; (Building Regulations)
38.That the engineer / contractor shall coordinate with the appropriate utility companies to relocate power poles which would interfere with the street improvements in the public right of way on Hawthorne Boulevard.; (Engineering)
39.That the proposed driveways on Hawthorne Blvd. shall be constructed to a commercial radius type driveway minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
40.That a minimum 10' wide level area is required behind the sidewalk before sloping down toward the subterranean garage; (Engineering)
41.That a turning template study for the proposed driveway is required to demonstrate that vehicles are able to turn into the subterranean garage. The study shall be submitted to and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit; (Engineering)
42.That a hydrology study is needed to determine the height of hike up behind the 10' wide level area behind the north driveway apron. The study shall demonstrate the public storm water which runs down Hawthorne Boulevard will not flow into the subterranean garage. Approval of the study is required prior to issuance of Grading Permit; (Engineering)
43 108
43.That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduce pressure backflow assemblies shall be located above ground on private property near the public right-of-way. Final location and access shall be approved by the Community Development Department and incorporated into the onsite landscaping plan prior to Building Permit issuance; (Engineering)
44.That the project shall be supplied by master public water meter with privately owned, operated, maintained and administered submastering system for each dwelling unit per California Senate Bill 7, WOLK; (Engineering)
45.That one fire hydrant shall be installed near the proposed driveway approach; (Engineering)
46.That the applicant/developer shall design and construct 8" VCP mainline sewer and connection to existing public sewer main per public standards. The sewer plans, prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Sewer main shall be constructed prior to occupancy; (Engineering)
47.That the applicant shall submit a sewer study discussing the new development's impact on the existing downstream public sewer mains. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of a grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
48.Submit a noise attenuation plan to the satisfaction of the Environmental Division. The recommendations of the Noise Study/Noise consultant shall be adhered to and incorporated into plans submitted to the City of Torrance. Plans shall show how noise recommendations will mitigate noise, so that when completed, this use will comply with the TMC & will not disturb neighboring properties; (Environmental)
49.All signs (new, modified or revised) must be approved by the Environmental Division with appeal rights to the Planning Commission, or comply with the previously approved sign program; (Environmental)
50.Provide 9" (minimum) contrasting address numerals for non-residential uses; (Environmental)
51.Provide bike rack(s). Applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail, to the satisfaction of Environmental Division; (Environmental)
52.Guest parking stalls are reserved for guests and shall remain guest parking. Guest stalls shall be clearly marked; (Environmental)
44 109
53.Provide a mail kiosk and unit location map; (Environmental)
54.Verify 25' turning radius from jamb of garage door; (Environmental)
55.All trash shall be kept in an enclosure that is bounded on three sides by a decorative wall, decorative trellis and solid doors and shall be constructed of materials and of a design, color and texture which is architecturally compatible with the buildings and structures on the property; (Environmental)
56.The trash enclosure shall have a metal barrier roof covering to prevent rainwater intrusion to meet current NPDES requirements; (Environmental)
57.Provide bins/containers within trash enclosure for the storage and retrieval of trash and recyclable materials; (Environmental)
58.Upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that project(s) are in compliance with California Building Code (CBC).
All deficiencies shall be addressed to the satisfaction of the Building Official; (Grading)
59.The applicant shall continue to work with staff regarding the geotechnical report.
Geotechnical report shall be prepared per LA County soils report preparation manual, CBC, TMC and to the satisfaction of the building official; (Grading)
60.That the business name and address shall be visible from street; (Police)
61.That non-glare security lighting shall be installed for the parking lot; (Police)
62.That four-foot tall address numerals shall be painted on rooftop for aerial identification; (Police)
63.That secured property shall provide Knox Box lock access for Police and Fire, and includes any secured parking garage gates and common entry doors to the property; and (Police)
64.That a site map at entrance of multi-unit residential community or business park which identifies unit addresses and locations shall be provided, and that posting of site map/unit directory shall be provided at lobby elevator and main pedestrian entrances to expedite emergency response; (Police)
65.That the complex’s address numerals and business names shall be visible from the main fairway; (Police)
66.That all security camera footage shall be maintained in proper working order at all times, and that recorded footage shall be made available to the Torrance Police Department upon request; (Police)
45 110
67.That surveillance footage shall be stored for a minimum of sixty (60) days, of parking garage, secured common and commercial area entrances and primary pedestrian walkways, and that the Torrance Police Department strongly recommends that the video surveillance system be Open Network Video Interface Forum (ONVIF) compatible; (Police)
68.That project shall provide collection for refuse, organic material and recycling per State Law SB1383; and (Public Works – Sanitation)
69.That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 19th day of November 2025. __________________________________
Chairman, Torrance Planning Commission
ATTEST:
__________________________________
Secretary, Torrance Planning Commission
46 111
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 19th day of November 2025, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
47 112
ITEM 8A
ATTACHMENT 2
Revised Code Requirements
ITEM 8A
ATTACHMENT 2
48 113
CODE REQUIREMENTS
The following is a partial list of code requirements applicable to the proposed project. All possible code requirements are not provided here and the applicant is strongly advised to contact each individual department for further clarification. The Planning Commission may not waive or alter the code requirements. They are provided for information purposes only.
Building Regulations
1. Comply with current CA State Codes.
Engineering – Permits & Records
(Conditional Use Permit)
2. A Construction and Excavation Permit (C&E Permit) is required from the Community Development Department, Engineering Permits and Records Division, for any work in the public right-of-way on Hawthorne Blvd. (City Code Sec. 74.6.2)
3. Grant a 6' wide public street and highway easement along the project frontage on Hawthorne Blvd.
4. Design and construct curb & gutter, 4' wide sidewalk, driveway aprons, make-up paving and 4' wide irrigated parkway adjacent to curb for the length of the property frontage as per City approved plans; Curb shall be moved 6' east from the existing curb along frontage with reverse curve transition. Plans to be submitted by developer and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit.
5. Install a street tree in the City parkway every 50' for the width of this lot on Hawthorne Blvd. (City Code sec. 74.3.2). Contact the Streetscape Division of the Torrance Public Works Department at 310-781-6900 for information on the type and size of tree for your area.
6. That on-site drainage shall be collected within the lot and drained through the curb to the public street on Hawthorne Blvd or obtain drainage easements from adjacent private property owners to drain through the curb on Eleda Drive. (City Code Sec. 81.2.52) (Division of Lot)
7. Required public Street and Highway easement shall be shown on Final Parcel Map.
8. Final Parcel Map must record prior to obtaining occupancy permits.
9. All Final Parcel Maps are to be compiled from field survey data unless otherwise approved by the City Engineer. (City Code Section 92.29.7)
10.All physical public improvements which are conditions of this Planning Case must be completed prior to occupancy.
Engineering – Water
11.Must comply with the City of Torrance Municipal Code, the California Administrative Code, Title 17-Public Health Code regarding domestic water cross-connection control.
12.Public water facilities needed to serve this site, including as applicable, mains and appurtenances shall be constructed at the cost of applicant/owner per Torrance Municipal Water (TMW) plans and specifications. TMWD shall make final determination/approval for location, type, and size of all water facilities.
13.That separate meters shall be provided for each commercial unit and for common use (irrigation, maintenance, etc).
49 114
14.Extend 8" DIP water main approximately 400' across property frontage along east side of Hawthorne Blvd, then cross street to join existing water main in west side of Hawthorne Blvd.
Environmental
15.Bedroom sizes to be as determined per Torrance code (92.20.2).
16.Lot sweeping, deliveries and trash pick-up are prohibited between 10 P.M. And 7 A.M. per Torrance code (92.30.4).
17.The Van Accessible loading area shall be at least 8 feet wide and the words "NO PARKING" shall be painted on the ground within each loading access aisle in white lettering no less than 12 inches high and located so that it is visible to traffic enforcement officials.
18.The property shall be landscaped prior to final inspection per Torrance code(92.21.9).
19.Direct lighting away from residential land uses per Torrance code(92.30.5).
20.No illegal signs, A-frames, banners, bow banners, balloons, sign holders/twirlers, etc. are permitted.
21.Residential parking stalls next to walls shall be a minimum of 10-ft. Wide per Torrance code (93.5.2).
22.Double-line stripe all parking spaces per Torrance code (93.4.6).
23.Screen all roof equipment from public view per Torrance code (92.30.2).
24.Provide 200 cubic feet of storage area per unit in garage area (R-3) per Torrance code (93.5.11).
Fire Prevention
25.The Torrance Fire Department Operations Manual Access Roadways for Fire Apparatus Fire Lanes will apply.
26.Separate submittals for fire sprinkler underground, fire sprinkler, fire alarm will be required.
Grading
27.The applicant shall apply for a grading permit and provide precise grading plan prepared by a Registered Civil Engineer for approval by the Building and Safety Division. The plans shall address the specific grading, drainage, and geotechnical design parameters for design of the proposed construction. The plans should include, but not be limited to: specific elevation grades, keyways, subdrains, limits of removals, retaining walls callouts every 15 to 30 feet, and other information necessary to establish in detail the horizontal and vertical geometric design. The plans shall reference the approved geotechnical report, and reflect cut, fill, compaction and over-excavation requirements contained therein. The plans shall reflect all proposed drainage facilities, including storm drains, area drains, catch basins/inlets, swales, and other drainage devices necessary for the interception, conveyance and disposal of on-site and offsite drainage consistent with the project drainage report per TMC 81.2.49 (J103) and TMC
81.2.50(J104). Precise grading plan shall detail compliance paths of travel, accessible parking stalls per 2022 California Building Code (CBC) 11B-201
28.The applicant shall submit a detailed geotechnical report prepared by a registered design professional. The geotechnical report must specifically address the proposed improvements including engineering calculations for all graded slopes, foundations, retaining walls, temporary excavations and other aspects as required by the proposed 50 115
development. The report shall present detailed geotechnical recommendations for design and construction of the proposed project and improvements. The reports should be in accordance with the County of Los Angeles standards and to the satisfaction of the City of Torrance Building and Safety Division standards and requirements. TMC
81.2.50 and CBC 1803. Slope setbacks shall comply with 2022 California Building Code section 1808.7.
29.The applicant shall have a final drainage study prepared by a Registered Civil Engineer.
The drainage study shall be prepared in report format and include sections addressing on-site and off-site drainage areas, existing and developed conditions hydrology, the design hydraulics for the on-site drainage system, including sizing of inlets, conduits, vditches, down drains and other structures, and associated calculations and conclusions. The drainage study shall demonstrate project compliance with the current Los Angeles County Public Work Department's Hydrology Manual and Hydraulic Design Manual; however the minimum design flow for sizing onsite drainage devices shall be 25 year recurrence (Q25) or 50 year storm for sump conditions. The drainage study shall be submitted to the Building and Safety and approved by the Building official prior the issuance of a grading permit Per TMC 81.2.50 (J104.9)
30.All drainage shall be sloped 2% away from all parts of building structures along impervious surface and 5% away along pervious surface, in conformance with California Building Code; and conveyed through an on-site storm drain system to an approved point of disposal (i.e. street) per CBC 1804.4 and TMC 81.2.51 (J107.6)
31.Drainage plans shall incorporate appropriate post-construction best management practices (BMPs) into the design of the project and must be prepared and approved prior to issuance of any grading permit per TMC 411.1.050. Please refer to the Los Angeles County Low Impact Development (LID) Manual for applicable design requirements. The project-specific LID plans shall describe how this project design conforms to all requirements set forth in the LID manual and must include a fully executed and recorded LID covenant to provide for on-going maintenance of the BMPs that have been chosen. Stormwater quality design volume (SWQDv) shall be retained onsite per TMC 411.1.070.
32.Per TMC 410.1.070 the owner/owner's agent shall submit erosion control plan to Building and Safety review and approval from Building Official to ensure the following minimum requirements are effectively implemented at the construction site:
33.Sediments generated on the project site shall be retained using adequate Treatment Control or Structural BMPs;
34.Construction-related materials, wastes, spills, or residues shall be retained at the project site to avoid discharge to streets, drainage facilities, receiving waters, or adjacent properties by wind or runoff;
35.Non-storm water runoff from equipment and vehicle washing and any other activity shall be contained at the project site; and
36.Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as the limiting of grading scheduled during the wet season; inspecting graded areas during rain events; planting and maintenance of vegetation on slopes; and covering erosion susceptible slopes.
37.Cover sheet of construction document shall include area (acres) of disturbed soil, disturbed soil 1 acre or more required the owner to file a Notice of Intent with the Division of Water Quality of State Water Resources Control Board and prepare a SWPPP per TMC 410.1.070.
51 116
38.All undocumented fill shall be removed, until competent native soils have reached, and recompacted from property line to property line. TMC 81.2.50(J104.5)
39.Retaining wall proposed to accommodate the cuts and fills shall obtain separate building permit from Building and Safety Division per CBC 105, TMC 81.2.47 (J101.3.1) and TMC 81.2.49(J103).
40.All lots shall have a minimum grade of 1%. The lot shall be graded to drain to the street per TMC 81.2.51(J107.6)
41.Ponding of water shall not be permitted to occur on pavement, concrete or in landscape areas per 81.2.52
42.That the proposed driveway shall not exceed the maximum grades of 20% and 10% cross-slope. The algebraic difference in grade between any two (2) adjacent six (6) foot chords (6’ minimum) in the approach ramp profile shall not exceed twelve (12) percent per TMC 93.4.5. Proposed grades shall be shown on Grading Plan and approved by the Building and Safety Division prior to the issuance of Grading Permit.
Planning
43.Front, side and rear setbacks shall be the same as the R-3 zone, but may be required to be greater by the Planning Commission, or City Council on appeal (TMC
95.3.45.a.6).
44.The minimum size for one (1) bedroom dwelling units is 500 sq. ft. (TMC
95.3.45.a.3.B)
45.For senior citizen housing, there shall be provided one (1) parking space per dwelling unit plus no less than one (1) additional visitor parking space for each five (5) dwelling units (TMC 93.2.3.g).
46.One off street loading space shall be provided and maintained on the same lot for every separate occupancy requiring delivery of goods and having a floor area of less than ten thousand (10,000) square feet. Each required off street loading space shall be not less than ten (10) feet in width and twenty-five (25) feet in length, with a minimum height clearance of fourteen (14) feet and shall be so arranged that it will not impede traffic circulation within the parking area or will not block parking stalls. Where the occupancies are integrated or connected in design, loading space area may be based solely on the floor area involved without reference to separate occupancy (TMC 93.3.1)
47.Where covered parking is required for three (3) or more dwelling units, there shall be provided a minimum of two hundred (200) cubic feet of lockable, enclosed storage space for each dwelling unit (TMC93.5.11.a)
Public Works - Streetscape
48.Plant 24” box Crape Myrtle “Muskogee” street trees in new parkway. Call Streetscape Division for specific number of trees and locations.
52 117
ITEM 8A
ATTACHMENT 3
Engineering Division Email and Memorandum
ITEM 8A
ATTACHMENT 3
53 118
1 Gomez, Yolanda
From: Fisher, Zachary
Sent: Monday, November 17, 2025 4:06 PM
To: Gomez, Yolanda
Cc: Chehab, Ghassan; Garcia, Robert
Subject: Planning Commission 11-19-25 - Agenda Item 8A
Attachments: Supplemental Form - Item No. 8A - 11-19-25.pdf Good Afternoon Yolanda,
There is a single Engineering Code requirement and a single special condition that should be excluded from the report (both are duplicate conditions). Please see attached the Supplemental Form for Item 8A for Wednesday’s commission meeting.
Thank you,
ZACHARY FISHER
Assistant Engineer
Community Development Department
310-781-7699
[email protected]
3031 Torrance Blvd. | Torrance, CA 90503
TorranceCA.Gov Facebook
X (Formerly Twitter) Instagram
This email, and any attachments to it, may contain confidential information and is intended for the sole use of the intended recipient(s). If you are not the intended recipient, or believe that you may have received this email in error, please notify the sender and delete this email and any attachments. Any review, reliance, disclosure, copying, storing, distribution, forwarding without express permission, or use of the contents of the information received in error is strictly prohibited. 54 119
55 120
ITEM 8A
ATTACHMENT 4
LA County Sanitation District Email and Comment Letter
ITEM 8A
ATTACHMENT 4
56 121
1 Gomez, Yolanda
From: Garcia, Robert
Sent: Monday, November 17, 2025 7:51 AM
To: Gomez, Yolanda
Subject: Fw: NOPH Response for CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 Attachments: DMS-#7640554-v2-NOPH_Response_for_CUP21-00018__DVP21-00001__PRE21-00009 __DIV21-00009.PDF
Hi Yo,
Please forward the comment letter from the Sanitation District to the applicant for their awareness and reply to the sender acknowledging that we received their comments. The comment letter should be included in the supplemental package.
Thanks,
From: Wang, Shirly <[email protected]>
Sent: Friday, November 14, 2025 12:11 PM
To: Planning Commission <[email protected]> Subject: NOPH Response for CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009
Dear Mr. Garcia,
Attached is the comment letter for the subject project. Please contact me with any questions.
Thank you.
Shirly Wang (she/her/hers)
Annexation and Will Serve Desk Coordinator
Property Management Group
562-908-4288 ext. 2708
[email protected]
–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– Website | Facebook | X (Twitter | Instagram | YouTube
57 122
November 14, 2025
Ref. DOC 7640379
VIA EMAIL [email protected]
Mr. Robert Garcia, Planning Manager
Community Development
City of Torrance
3031 Torrance Boulevard
Torrance, CA 90503
Dear Mr. Garcia:
NOPH Response for CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 This is in reply to your notice, which was received by the Los Angeles County Sanitation Districts (Districts) on November 10, 2025. The proposed project is located within the jurisdictional boundary of District No. 5. We offer the following comments regarding sewerage service:
1. The wastewater flow originating from the proposed project will discharge directly to the Districts’ Madison Street Trunk Sewer, located in Rolling Hills Road at Hawthorne Boulevard. The Districts’ 7.5–inch diameter lined trunk sewer has a capacity of 0.6 million gallons per day (mgd) and conveyed a peak flow of 0.3 mgd when last measured in 2017. A 6-inch diameter or smaller direct connection to a Districts’ trunk sewer requires a Trunk Sewer Connection Permit issued by the Districts. An 8-inch diameter or larger direct connection to a Districts’ trunk sewer requires submittal of Sewer Plans for review and approval by the Districts. For additional information, please contact the Districts’ Engineering Counter at (562) 908-4288, extension 1205, or [email protected].
2. The wastewater generated by the proposed project will be treated at the A.K. Warren Water Resource Facility (formerly known as the Joint Water Pollution Control Plant) located in the City of Carson, which has a capacity of 400 mgd and currently processes an average flow of 246 mgd.
3. The expected average wastewater flow from the project, described in the notice as 20 senior citizen residential apartments and 1,608 square feet of commercial space, is 3,643 gallons per day. For a copy of the Districts’ average wastewater generation factors, go to www.lacsd.org, under Services, then Wastewater Program and Permits and select Will Serve Program, and click on the Table 1, Loadings for Each Class of Land Use link.
4. The Districts are empowered by the California Health and Safety Code to charge a fee to connect facilities (directly or indirectly) to the Districts’ Sewerage System or to increase the strength or quantity of wastewater discharged from connected facilities. This connection fee is used by the Districts for its capital facilities. Payment of a connection fee may be required before this project is permitted to discharge to the Districts’ Sewerage System. For more information and a copy of the Connection Fee Information Sheet, go to https://www.lacsd.org/services/wastewater-programs-permits/wastewater-revenue-program/revenueprogram-rates. In determining the impact to the Sewerage System and applicable connection fees, the Districts will determine the user category (e.g. Condominium, Single Family Home, etc.) that best 58 123
59 124
ITEM 8A
ATTACHMENT 5
Public Correspondence
ITEM 8A
ATTACHMENT 5
60 125
61 126
62 127
63 128
64 129
65 130
66 131
67 132
68 133
69 134
70 135
71 136
72 137
73 138
74 139
75 140
76 141
77 142
78 143
79 144
80 145
81 146
82 147
83 148
84 149
85 150
86 151
87 152
88 153
89 154
90 155
91 156
92 157
93 158
94 159
95 160
96 161
97 162
98 163
99 164
100 165
101 166
102 167
103 168
104 169
105 170
106 171
107 172
108 173
AGENDA ITEM NO. 8A
DATE: November 19, 2025
TO: Planning Commission
FROM: Yolanda Gomez, Planning Associate
SUBJECT: East side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road
Conditional Use Permit (CUP21-00018)
Development Permit (DVP21-00001)
Precise Plan of Development (PRE21-00009)
Division of Lot (DIV21-00009)
Consideration of a series of entitlements to allow the construction of a new mixeduse development comprised of 20 senior residential apartments and 1,608 square feet (sq. ft.) of commercial space. The request includes a Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus, Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009), on property located within the Hillside and Local Coastal Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria District (HBCSP-WT) Zone, on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547-004-046).
RECOMMENDATION
Recommendation of the Community Development Director that Planning Commission conduct a public hearing and consider adoption of Resolutions Nos. 24-021, 24-022, 24-023, and 24-024 for approval of CUP21-00018 in conjunction with a Density Bonus, DVP21-00001, PRE21-00009, and DIV21-00009 to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 sq. ft. of commercial space, on property located within the R-H Overlay in the HBCSP-WT Zone, and determine a Categorical Exemption for the project in accordance with the California Environmental Quality Act (CEQA); Article 19, Section 15332 (In-Fill Development) and Section 15315 (Minor Land Divisions).
EXECUTIVE SUMMARY
The project applicant, Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), requests approval by the Planning Commission to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 sq. ft. of commercial space, on property located within the R-H Overlay and the HBCSP-WT Zone.
The proposal features a multi-story building of varying heights, consisting of 19 market rentals with one rental reserved for very-low-income
Laws that allow for concessions and waivers of local codes, development standards and design guidelines. The floor plans are all one-bedroom configurations and include laundry facilities within each unit.
109 174
Pursuant to the Torrance Municipal Code (TMC), the HBCSP-WT Zone and R-H Overlay the proposal requires multiple entitlements, as follows:
Conditional Use Permit (CUP21-00018) to allow the construction of more than 15,000 sq. ft. of area, and to allow shared parking between residential guests and the commercial space parking.
Development Permit (DVP21-00001) to allow new construction in the HBCSP-WT on vacant land, to allow a mixed-use project, and to allow a Floor Area Ratio (FAR) that exceeds 0.6.
Precise Plan of Development (PRE21-00009) to allow development in the R-H Overlay that exceeds 0.50 FAR, exceeds one-story, exceeds 14-ft. in height, and may have an adverse effect on other properties in the vicinity and where there is significant public controversy.
Division of Lot (DIV21-00009) to allow the merger of seven lots into one lot.
Staff has reviewed the project and determined compliance with the objective development standards of the TMC, HBCSP-WT, R-H Overlay and the General Commercial (C-GEN) Land Use Designation of the General Plan. The proposal also includes requests for concessions and waivers consistent with the State Density Bonus Law.
DISCUSSION
General Plan Land Use Designation
The project site has a C-GEN General Plan designation, which is intended to permit a wide range of commercial uses that serve both the local and regional community. Permitted uses include shopping centers, professional and medical offices, food and beverage establishments, entertainment facilities, financial institutions and automotive sales. Mixed-use development consisting of commercial and residential uses is permitted pursuant to the detailed land use regulations and development standards set forth in the TMC. For mixed commercial and residential projects, a maximum FAR of 1.0 is permitted. Density is not specified in the C-Gen.
The General Plan designation is implemented by the C-1, C-2, C-3, C-5, C-R and PD zones. The HBCSP-WT District permits a base density of 27 dwelling units per acre, an FAR of 0.6, and with approval from the Planning Commission, the FAR for mixed-use developments may be exceeded.
The property's HBCSP-WT zoning is consistent with its General Plan designation of C-GEN. The proposed horizontally integrated mixed-use development is a conditionally permitted use within the HBCSP-WT Zone.
The General Plan calls for a variety of housing types and sizes to meet community needs and provide housing opportunities for a range of incomes and lifestyles. The addition of 20 dwelling units (DU), including one very low- th Cycle (2021-2029) Regional Housing Needs Assessment (RHNA) allocation of 4,939 units, contributing towards The General Plan calls for a high-quality, built environment that is aesthetically pleasing, and compatible with existing developments. Issues to consider include bulk, adequacy of privacy and the provision of adequate open space. These issues are especially important when considering the existing Single Family Residential (R-1) uses to the north. Since this project is located within the R-H Overlay, impacts to surrounding properties should be minimized to the extent possible. 110 175
Adjacent Land Uses and Zoning Designations
The project site is located adjacent to different land uses that are consistent with various zoning designations. To the north of the property are single family residences, to the east are additional single-family residences and a parking lot for a professional office building, to the south is the professional office building; and to the west (across the street) are undeveloped parcels.
NORTH: R-1, R-H; single family residences
EAST:R-1, R-H; single family residences, and HBCSP-WT, R-H, office building parking lot SOUTH: HBCSP-WT, R-H; office building
WEST: A-1, R-H, and HBCSP-WT, R-H, undeveloped parcels
Existing Site
The proposed site is located on the east side of Hawthorne Boulevard, approximately 200 ft. north of the northeast corner of Hawthorne Boulevard and Rolling Hills Road. As undeveloped property, it does not have an assigned street address and is further described with seven Numbers (APN) 7547-004-040 through 046. The site does not provide any remarkable properties, with mostly vegetation and exposed dirt. The shape of the seven combined parcels will remain irregular, with a wider, jagged contour along the south at approximately 140 ft. at its widest, which tapers to a point at the northernmost boundary. The property slopes sharply downward towards the north and northeast, providing various descending grades, with a culvert and well, at the bottom of the property, providing limited building pad area. The soils report provided by the it as a monitoring well. Staff has included
a Condition of Approval that the applicant shall provide a Phase I study noting the status of the well/s and their location/s, and whether any mitigation measures are required, prior to Building Permit issuance. The property, near the street, slopes gradually downward from south to north, following the street slope and also follows the curves of the street. The subject site provides a combined area of 24,635 sq. ft. (0.57 acre).
Immediately south of the subject property is the Rolling Hills Business Centre, at the northeast corner of Hawthorne Boulevard and Rolling Hills Road, which was developed circa 1999, and is a three-story commercial office development, with a parking field, immediately adjacent to the proposed site. This property is situated higher than the subject site, as Hawthorne Boulevard slopes upward from north to south and curves clockwise starting from approximately Newton Street, past the subject site, and past Rolling Hills Roa Immediately to the north and northeast, downslope and adjacent to the subject site are single family residences, located within the R-H Overlay. The four homes on the south side of Eleda Drive were constructed in 1976, as were many homes in the tract in this vicinity. These properties are situated substantially lower than the subject site, at approximately 22-ft. below the front property line of the project, at the southernmost portion, along Hawthorne Boulevard. Eleda Drive is a cul-de-sac, west of Madison Street.
Hawthorne Boulevard. It is at a higher elevation than the proposed site, and is undeveloped with vegetation.
Housing Accountability Act Applicability
Pursuant to Government Code Section 65589.5, also known as the Housing Accountability Act defined by local ordinance. The HAA is intended to significantly limit the ability of local agencies to disapprove, or conditionally approve, housing development projects that comply with 111 176
applicable, objective general plan, zoning, and subdivision standards and criteria. It applies to housing development projects that consist of residential units and mixed-use developments when two-thirds or more of the square footage is designated for residential use. Therefore, this project as those that are measurable, clear, and do not rely on personal judgment or discretion. In contrast, the planning and design provisions of the R-H Overlay involve subjective criteria that require interpretation, such as considerations of neighborhood compatibility and view impacts.
These provisions require discretionary interpretation and are therefore not considered objective standards. Consequently, the application of the R-H Overlay provisions is superseded by the HAA.
Background
Over the course of approximately 20 years, numerous applications by various property owners for solely residential and mixed-used projects have been submitted for the subject site, with some denials by Planning Commission, and mostly withdrawals by the applicants. With each submittal, many residents and the adjacent commercial property owner have opposed the projects noting substantial impacts related to the R-H Overlay property protections of view, light, air and privacy.
The current applicant has worked with staff over seven years, over multiple iterations, in attempts to meet the Hillside regulations. However, with the passing of the HAA regulations removing the local development standards from review, the applicant has submitted a project that includes a Density Bonus application, providing one affordable rental unit, in order to utilize the Density Bonus s relief with concessions and waivers from discretionary and subjective development standards.
The project was previously scheduled on the April 17, 2024, Planning Commission hearing; however, the applicant requested a continuance to continue working with Fire Department staff The Planning Commission granted an indefinite
continuance on April 17, 2024.
Project Overview
The proposal includes a 20-unit senior citizen residential development with a small commercial component of 1,608 sq. ft. The rental units are open market rate, except for one unit earmarked for a very low-income tenant, in order to apply the State Density Bonus Law relief (Government Code Section 65915 65918), through specified concessions and waivers of local codes. The development standards of the TMC, HBCSP-WT, R-H Overlay and Subdivision Map Act are applicable to this project, and staff has determined that the project complies with these development standards, to the extent applicable. Staff has determined that the project complies with the State Density Bonus Law, and specifics to the concessions and waivers applied are noted in the below section.
Density Bonus (R-H, HBCSP & TMC)
As provided for in State Density Bonus Law (Government Code Section 65915 65918), the project includes a Density Bonus application with one concession and two waivers noted below.
Staff has determined the project complies with State Density Bonus Law and is entitled to receive the related benefits, so long as the project does not affect life and safety issues.
The project site is located within the HBCSP-WT Zone, which permits mixed-use developments with a base density of 27 Dwelling Units (DU)/acre. The Senior Citizen Housing Development Standard allows up to 58 DU/acre, as 750 sq. ft. of land is required per DU. The project site measures 0.57 acres, with 20 units proposed, the project provides 35 DU/acre, and is less than 112 177
the maximum density. Therefore, the applicant is not asking to exceed the permitted density and did not opt to exercise the density bonus portion of the law. The project is providing one affordable unit (5% of 20 base density units) reserved for the very low-income level.
Based on the number of affordable units provided (one), the project is entitled to receive one concession, and the reduction of commercial space (less than 25% of total gross area required by the HBCSP-WT) was chosen by the applicant, at 1,608 sq. ft., which amounts to approximately seven percent of total gross area. The minimum would be 6,050 sq. ft. at 25 percent.
State waivers are unlimited and may be requested when existing development standards would make construction of the project physically infeasible. Each waiver request must provide justification for the need and scope of each waiver. The proposed plans provide the aforementioned justification.
residential properties from 20-ft to 10-ft at the lower basement garage level required by HBCSPWT; and (2) reduction in the front yard average setback from 20-ft to 8.35-ft., and minimum dimension from 10-ft. to 6-ft., reduction in the south side yard setback from 5-ft. to 1 - by the R-3 (Senior Citizen development standard). A third waiver was initially requested for height and shown on the plans; however, it was withdrawn, and a revised Waiver justification was provided by the applicant via email (Attachment 8). Staff is providing a Condition of Approval that the revised Density Bonus justifications will be provided on the final Building Plans.
Staff notes that concessions and waivers are not subject to subjective review. Staff notes that no other concessions, incentives or waivers have been incorporated into the project.
In accordance with State Density Bonus Law, if the project is approved, the applicant will be required to record a Density Bonus Housing Agreement to memorialize the approved density bonus allowance, incentives, concessions, and/or waivers of development standards, development standards and uses, parking allowances, and any other terms and conditions relative to the project that have been included in the attached Resolutions (Attachment 1).
Staff reviewed the silhouette structure and after some modifications determined that it was as close to plan as logistically possible, with the exception of the far east portion, due to existing November 3, 2025, a revised
silhouette certificate form was provided, showing the correct maximum height of 250 , and While the LAG is not specified on the elevations, the elevation point at the bottom garage level. With a
noted on the elevations, the project provides a maximum height of . The maximum height of 45-ft. in the HBCSP-WT was not exceeded, and therefore, the height waiver was withdrawn, as noted above.
Building Architecture and Design
The three-story building is designed with a semi-subterranean level that provides the entire parking for the site, both residential and commercial. This level also provides stairs, an elevator, a storage room, trash room, bike storage room, electrical/mechanical room and a loading area for the commercial use. There is only one driveway proposed and is shown along the northernmost portion of the building, on Hawthorne Boulevard. This driveway leads only into the garage; there are no other roadways or vehicle access points on this project. 113 178
The second level is designed at partial street level and provides the commercial office space and nine residential apartments, an amenity/fitness room, trash area and small storage area, aside from stairs and elevator. A transformer is shown north of the driveway.
The third level provides 11 residential apartments, a second amenity room, trash area and storage room, aside from stairs and elevator.
The building plan provides the three levels in a stacked design that follows the general contours of the irregularly shaped property. It is a contemporary design that provides multi-colored stucco, concrete and metal siding accents, metal and glass railings, metal canopy, vinyl windows, and metal ventilation grills at the garage level. The roof material will be predominately Thermoplastic Polyolefin (TPO), with metal treatment on the southwest the flat section. Landscaped perimeters are shown around the majority of the building, with larger landscaped areas at the east and north portions of the property.
As proposed, there does not appear to be any separation of the residential component from the commercial space. Per the HBCSP-WT mixed use development standards, access to residential units shall be from a secured area located on the first floor or at ground level, and restricted. the security of residents. Staff has provided a Condition of Approval to address this safety requirement. The HBCSP-WT mixed use development standards state that trash/recyclable material storage facilities shall be located as far as possible from residential units and shall be completed screened from view from the residential portion of the project. Staff notes that while a trash room is located in the garage level, there are also smaller trash rooms at each living area level. However, staff notes that providing the trash facilities on each floor of the residential units may be a convenience in a senior housing facility, and supports their location as designed.
Building Setbacks
The below table is provided for your convenience:
The Senior Citizen Housing code requires setbacks to meet the R-3 development standards, which provide for a 20-ft. average in the front, minimum dimension of 10-ft., 10% of the lot width for the sides, but is not required to exceed 5-ft., and 10-ft. for the rear. While the applicant requested a Density Bonus waiver of the front yard, no waiver was requested for the side yard.
Staff contacted the applicant to submit a revised Density Bonus request and justification noting the side yard waiver (Attachment 8). Staff has reviewed the revised request and is providing a Condition of Approval that the final Building Plans shall include this side yard waiver justification, prior to Building Permit issuance.
The HBCSP-WT requires a commercial project to provide a minimum separation setback of 20- ft. adjacent to residential properties. The plans provide for 20-ft. at the two levels of residential 114 179
and commercial areas; however, the parking basement only provides 10-ft. The applicant Density Bonus law to allow this setback reduction.
Building Height
The maximum building height is calculated by staff - building at the staircase, which provides an elevation of 250.00 taken from the lowest adjacent grade (LAG) at the parking level . The HBCSP-WT allows a maximum height of 45-ft.
The majority of the building provides a height of 37-ft. from LAG. The Eleda Drive residents appear to be at an elevation approximately 11-ft. below the proposed garage level, per the Drive
As mentioned in the Density Bonus paragraph, initially the applicant submitted a request for waiver of the HBCSP-WT height requirements erroneously, and while indicated on the plans, has since provided a revised justification noting its removal. Staff is recommending a Condition of Approval that the final Building Plans shall provide the revised waiver requests.
Site Improvements, Access, Circulation and Parking
One driveway/curb cut is proposed at the northern portion of the site and building on Hawthorne Boulevard. In the vicinity of the subject site, Hawthorne Boulevard is two-way traffic, with two lanes for each direction. There is no stopping or parking permitted on this section of Hawthorne Boulevard
Access at the driveway for all vehicles and trucks would require a 180° right turn into the parking garage. The plans and traffic documents provided, which included a Trip Generation and Vehicle Miles of Travel (VMT)
Department, Traffic Engineering Division, for review, and it was determined that with the proposed six foot street easement on Hawthorne Boulevard, to enlarge the traffic lane closest to the property line, visibility and access, would be enhanced to reduce traffic conflicts entering or leaving the site. It is unclear whether typical trucks, i.e., trash trucks, will be able to meet the unspecified maximum height clearance at the driveway entrance, as that detail is not provided on the plans. - top of plate for the floor above, so the interior clearance would be approximately 8-
For any commercial component, a truck loading area is required. For projects with less than 10,000 sq. ft., one loading area is required per TMC Sec. 93.3.1, with dimensions of 10-ft. wide by 25-ft. in length, with a minimum height clearance of 14-ft., and shall be so arranged that it will not impeded traffic circulation within the parking area, nor block parking stalls. One loading area is located near the apex of the northern wall, in the parking garage level. However, it does not meet the minimum dimensions, measured at approximately 9-ft. by 23-ft. It also does not appear to meet the minimum height clearance - change to the parking ceiling height would appear to be required, Staff met with the architect; however, he noted that changes in plate heights would drastically affect the stairwell and would and therefore, would not be feasible.
Small adjustments to the trash area could be made to adjust this loading area the length could be met was still a question. A second loading area/trash pickup area with the minimum stall dimensions was provided on the outside of the garage, adjacent to Hawthorne Boulevard, north of the driveway. Staff is not supportive of this loading area, as several potential collision conflicts could occur, as a trash or delivery truck attempts to back out of the space at the same time a vehicle is entering the driveway off of Hawthorne Boulevard, or a vehicle is exiting the driveway from the garage. Staff is recommending a Condition of Approval that the applicant 115 180
continue working with staff to resolve the loading space area and that the exterior loading area be removed or redesigned to meet safety concerns, should the interior garage loading area not meet code requirements.
Parking counts for senior housing require one parking space per DU, with 20 parking stalls proposed for the residential component. The commercial component shows five parking spaces, and five are required, based on the recent parking standard change of 1/333 sq. ft. Four parking spaces are required as residential guest parking; however, the HBCSP-WT mixed use development standard provides for the sharing of the commercial parking with the residential guest parking via CUP approval. Staff recommends a Condition of Approval that four commercial parking spaces be labeled as Commercial and Residential Guest Parking . The layout of the parking spaces is generally against the north and south walls, with a small row along the north area, and as mentioned, are all located on the bottom level.
On April 10, 2024, the Fire Department notified Planning staff that during a service call to this site, they will not enter the garage with their rigs, and will park their trucks on Hawthorne Boulevard, but will not be able to access the entire structure. Fire staff further advised staff that the project would need to be redesigned, as it did
When the height of a structure at the roof eaves exceeds 27 ft. or the capability of the Fire Dept. to access the roof safely utilizing ground ladders, the location and width of access roadways shall be such that the truck-mounted aerial ladders may be utilized. Aerial ladder access shall include the ability to maneuver apparatus, deploy outriggers, and provide proper climbing angles. The minimum road width shall not be less than 30-ft. As noted earlier in this report, there is only one driveway onto the site, and it leads into the semi-subterranean garage, and the building setbacks are minimal surrounding the majority of the building. Staff from Fire and Planning met with the applicant and architect to discuss the building design with the above limitations, and it was determined that providing a flat roofline at the southmost elevator penthouse at a maximum of 27- ft. would be adequate for fire access, and that the majority of the structure would be at 27-ft. or less from the adjacent street grade, except for the stairwell at the southwest corner of the property.
The stairwell is noted as 28-ft. in height from the adjacent grade, and is a small area; therefore, Fire staff did not have an issue with this portion of the building exceeding 27-ft. The plans show the maximum height from adjacent street grade as 27-ft. or less for the remainder of the building and meets the minimum requirement. The final Building Plans, street slope and details will be reviewed by TFD to verify this safety requirement.
Floor Area, Unit Floor Plans and Building Layout
Residential Component
The residential component consists of 20 senior apartments, with four different layouts, as shown in the floor plans, Sheet SD05. Unit Plan A-1 provides 15 units at 608 sq. ft., A-1 Alt provides two units at 590 sq. ft., A-2 provides 2 units at 523 sq. ft. and A-3 provides one unit at 704 sq. ft. All units are designed with one bedroom, one bathroom, and an open balcony deck. TMC requires a minimum of 500 sq. ft. for one-bedroom senior housing, and the project exceeds the size requirement. An open concept living room, dining room and kitchen is shown, and a laundry area is provided in each unit. Minimal closet space is provided in the bedrooms. The total gross areas, for the residential component Density Bonus application, one affordable unit is provided (5% of housing units), though not indicated on the plans, as to which unit is earmarked as affordable. The applicant is not applying the full density bonus allowed by the State, in that the HBCSP-WT permits a maximum of 27 DU/acre. The Senior Citizen Housing density allows up to 58 DU/acre. The proposed 20-unit project provides a density of 35 DU/acre, 116 181
which is below the maximum for the Senior code, and does not require implementation of a State permitted density bonus.
Commercial Component
The commercial area is shown on level two of the proposed building, fronting on Hawthorne Boulevard. HBCSP-WT mixed use development standard requires that at least 25% of the gross floor area must be used for commercial purposes. The commercial office space provided is 1,608 sq. ft., which is 6.6% of the total floor area (24,200 sq. ft.). The Bonus legislation permits one concession or relief of the development standard, and the applicant has chosen the minimum size of the commercial space as the concession. Therefore, staff approves the reduced The HBCSP-WT allows a maximum of 0.6 FAR; however, for mixed use developments, the FAR may be exceeded, with Planning Commission approval of a DVP and CUP. The R-H Overlay permits a maximum of 0.5 FAR for both residential and commercial development; however, the FAR may be exceeded with Planning Commission approval of a PRE. The General Plan floor area is 24,200 sq. ft. and provides an FAR of 0.98. When including only the individual residential units, the FAR drops to 0.49.
Open Space and Landscaping
The HBCSP-WT mixed-use development standards require a minimum of 300 sq. ft. of usable open space per DU, while the Senior Citizen Housing code requires a minimum of 200 sq. ft. per unit. The R-3 further describes private open space as the spaces on balconies and patios with The project has provided a total of 8,562 sq. ft., in private open space balconies and in common open space via the two enclosed amenity/fitness spaces, and the east and south side setback areas. The R-3 and other multi-family codes describe usable open space as areas accessible to tenants and designated for recreational purposes, such as, barbecue/picnic areas, putting greens, enclosed gyms, etc. Staff has provided a Condition of Approval that the usable common open space areas shall be specified and with actual designated recreational activity areas and dimensioned on the final Building Plans.
The HBCSP-WT development standards for landscaping indicate that any areas not covered by structures, walkways, driveways and parking spaces shall be landscaped. The TMC landscaping code requires that not less than five percent of a parking lot with more than 20 parking spaces shall be landscaped. The amount of landscaping provided by the project is not indicated on the plans, but shall be required via a Condition of Approval, and will require application and approval of a Landscape Plan Review (LPR).
The TMC requires a minimum of 200 cubic feet of lockable, enclosed storage space per DU, not including closets. While the plans show small storage rooms in the common area, at each level, the amount of area per DU is not provided. A Condition of Approval requiring details for any storage areas for each tenant has been provided.
As mentioned above, two amenity spaces labeled as recreation/fitness are provided, at each floor of the residential levels, and are shown as 411 sq. ft. per level, totaling 822 sq. ft., and a large bike storage room is provided at the garage level.
Conclusion
The applicant has provided a plan that complies with most of the TMC requirements and HBCSPWT Mixed-Use Development Standards. The applicant has requested concessions and waivers 117 182
of the State Density Bonus law for the following codes and standards: Concession 1: reduction of commercial space for a mixed use project (HBCSP-WT); Waiver 1: reduction in the setback adjacent to residential properties from 20-ft to 10-ft at the lower basement garage level (HBCSPWT); Waiver 2: reduction in the front yard average setback from 20-ft to 8.35-ft., reduction in the front minimum dimension from 10-ft. to 6-ft., and reduction in the south side yard setback from 5- - (R-3/Senior Citizen development standard). Staff notes that due to the project's use of the State Density Bonus Law, this project is exempt from the Hillside Overlay.
In the judgment of staff, the project is considered consistent with the HBCSP-WT zoning district, and the C-GEN land use designation, to the extent that review is permitted by the State. In addition, pursuant to the HAA, staff has determined the revised project meets the definition of a be applied for purposes of evaluating the revised project, and the R-H Overlay cannot be applied due to their subjective development standards. Staff, therefore, recommends approval of this request.
at: https://bit.ly/EnvironmentalDocuments.
ENVIRONMENTAL DETERMINATION
The project is categorized as infill development, which refers to development of unused or underutilized land located in urban areas, by the Office of Planning and Research. In accordance with the 2025 Guidelines for Implementation of CEQA, Article 19, Section 15332, Class 32, infill development projects are not found to have a significant effect on the environmental and are declared categorically exempt from further environmental review when: (a) the project is consistent with the general plan designation and zoning requirements; (b) the development is located on a site of less than five acres and is surrounded by urban uses; (c) the project site is not a habitat for endangered, rare or threatened species; (d) the project would not result in significant effects relating to traffic, noise, air quality or water quality; and (e) the project site can be adequately served by all required utilities and public services.
The project is also categorically exempt, based on Section 15315, Class 15, Minor Land Divisions, of the aforementioned CEQA guidelines, which provide for the division of property in urbanized areas zoned for residential and commercial uses into four or fewer parcels, when the division is in conformance with the General Plan and zoning guidelines, no variances or exceptions are required, all services and access to the proposed parcel to local standards are available, the parcel was not involved in a division of a larger parcel within the previous two years, and the parcel does not have an average slope greater than 20 percent.
The project meets the criteria for a Class 32 Categorical Exemption, as follows:
1. The project is consistent with the HBCSP-WT Zone and the C-GEN designation, which permit a base density of 27 DU/ acre, and allows mixed-use development to exceed a 1.0 FAR, with approval of a Conditional Use Permit. However, the project provides 35 DU/acre, which is below the Senior Citizen Housing maximum density of 53 DU/acre, and provides a FAR of 0.98.
2. The project site measures 0.57 acres and is surrounded by urban uses that include an office building to the south, single family residential to the north and east, and vacant land to the west.
118 183
3. The project site is not a known habitat for endangered, rare or threatened species. While the site is undeveloped, it is located within an urbanized environment. There are no outstanding natural features on the site nor in the vicinity. Additionally, the General Plan does not identify any candidate, sensitive or special status species that occupy the site.
The General Plan notes the site as an Mineral Resources Zone (MRZ)-2 zone in the Community Resources Element, under Mineral Resources. The MRZ-2 zone indicates that there are significant mineral deposits present or there is a high likelihood for their presence, and development should be controlled. Staff will require a Phase I study, noting the mineral resources, and any mitigation measures required, prior to development on this property.
4. The potential traffic, noise, air quality, and water quality impacts associated with the project were assessed in technical studies prepared in consultation with the Torrance Community Development Department and the Torrance Public Works Department (Technical Studies, Attachment 10). The studies found the project would not result in significant traffic, noise, air quality, nor water quality impacts. For example, with respect to traffic, the project would generate 108 daily trips. Five hundred daily trips would require a Level of Service (LOS)-based Traffic Circulation Analysis (TCA). Therefore, no further studies regarding traffic impacts are required, and the project should have no or less than significant impact to nearby roadways and intersections. Therefore, no improvements to offsite circulation are warranted. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code.
5. The project site is vacant land situated within an urbanized environment. The project would not extend any roads or other infrastructure. For example, although demand on the sewer system would increase with the project, the technical study found the existing sewer system has capacity to serve the project and does not require improvements. In addition, the anticipated population growth at the project site is well within the growth forecast that was identified in the 2021-2029 Housing Element update. The population of the City of Torrance is forecast to increase from 145,546 in 2020 to 159,800 in 2040. The addition of 20 apartment units or 53 persons at full occupancy (2.61 persons per household, the average calculated across all households, which would be substantially less for the proposed senior citizen apartment complex) represents a negligible impact on utility and public service capacity, and would not result in the need to construct new or physically alter facilities. Moreover, the project applicant is required to pay development impact fees (DIF) and school district fees to offset the incremental increase in the demand for public services.
The project meets the criteria for a Class 15 Categorical Exemption, as follows:
1. The mapping component of this project proposes to merge seven lots into one lot, and is therefore, less than four final parcels and qualifies as categorically exempt.
2. The proposed project does not require any variances or exceptions to the General Plan or zoning designation.
3. As conditioned, the project will conform to the local standards that are currently available for all services and access.
4. The subject parcel was not involved in a division of a larger parcel within the previous two years, and has been historically vacant .
119 184
5. el appears to have a slope of approximately nine percent and does not have an average slope greater than 20 percent.
FINDINGS OF FACT AND CONDITIONS OF APPROVAL
Staff has prepared draft findings and Conditions of Approval for consideration by the Planning Commission that are listed in the attached Resolutions (Attachment 1).
CODE REQUIREMENTS
Staff has prepared a partial list of requirements from the TMC, California Building Code (CBC), California Fire Code (CFC), et al., which are pertinent to the project (Attachment 3). Not all requirements are provided, and the applicant is strongly advised to contact each individual Department/Division for more information. The requirements are not subject to modification, and the Planning Commission cannot waive or alter the requirements.
PUBLIC NOTICE
In accordance with TMC, notices of the public hearing were made no less than 10 calendar days, before the Planning Commission meeting. Notices were posted at the project site on November 7, 2025, and were mailed on November 6, 2025, to the registered owners of properties, located the local newspaper (The Daily Breeze) and posted on the City of Torrance Planning Commission webpage on November 7, 2025.
RIGHT OF APPEAL
In accordance with TMC Sections 95.1.7, 96.2.5 and 92.29.15 decisions made by the Planning Commission may be appealed to the City Council within 15 calendar days of the adoption of the Resolutions
310.618.2870 or email at [email protected].
PROJECT PLANS
The project plans and all related documents are readily available for public review at the Permit Center (Planning Counter) located at City Hall, 3031 Torrance Blvd., Torrance, CA 90503, during normal business hours, open 8:00am to 5:00pm, Monday through Thursday, open alternate Fridays. Appointments are available by contacting the Planning Division at 310.618.5990. In addition, the project plans and all related documents are readily available for public review on the City webpage (https://bit.ly/EnvironmentalDocuments).
ATTACHMENTS
1. Planning Commission Resolutions Nos. 24-021, 24-022, 24-023, 24-024
2. Location and Zoning Map
3. Code Requirements
4. Hillside Ordinance Criteria Response Sheet
5. Revised Silhouette Certification & Map
6. Density Bonus Application
7. Correspondence
8. Revised Density Bonus Concessions and Waiver Justifications
9. Minutes Excerpt and Staff Report of the April 17, 2024 Planning Commission Hearing
10. Technical Studies (Limited Distribution: https://bit.ly/EnvironmentalDocuments)
11. Project Plans (Limited Distribution: https://bit.ly/EnvironmentalDocuments) 120 185
121 186
PLANNING COMMISSION RESOLUTION NO. 24-021
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF TORRANCE, CALIFORNIA, APPROVING A CONDITIONAL
USE PERMIT, IN CONJUNCTION WITH A STATE DENSITY
BONUS AND A SERIES OF ENTITLEMENTS, AS PROVIDED FOR
IN DIVISION 9, CHAPTER 5, ARTICLE 1 OF THE TORRANCE
MUNICIPAL CODE TO ALLOW THE CONSTRUCTION OF A NEW
MIXED-USE DEVELOPMENT COMPRISED OF 20 SENIOR
CITIZEN RESIDENTIAL APARTMENTS AND 1,608 SQUARE FEET
OF COMMERCIAL SPACE, ON PROPERTY LOCATED WITHIN
THE HILLSIDE OVERLAY DISTRICT (R-H) IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN-WALTERIA SUBDISTRICT (H-WT) ON THE EAST SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FEET NORTH OF ROLLING
HILLS ROAD.
CUP21-00018: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Conditional Use Permit (CUP21-00018) in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs:
7547-004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance at its meeting of November 19, 2025, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Conditional Use Permit in conjunction with a Density Bonus and a series of entitlements to allow the construction of a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547- 004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, due and legal publication of notice was given to owners of property in 122 187
the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines for Implementation, Article 19, Section 15332, Class 32, infill development projects are declared categorically exempt; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed project, as conditioned, will not be detrimental to the public interest, health, safety, convenience or welfare, nor have a significant effect on the environment and is declared Categorically Exempt (Class 32) from further environmental review in accordance with the 2025 Guidelines for Implementation of the CEQA, Article 19, Section 15322 Infill Development. In addition, the project site is not included on any hazardous waste and substances sites list, also known as the Cortese List, compiled pursuant to Section 65962.5 of the Government Code; d) That the proposed new senior citizen mixed-use development is conditionally permitted in the H-WT Zone, and complies with all the applicable provisions of this Division, as conditioned;
e) That the proposed project, as conditioned, will not impair the integrity and character of the H-WT Zone, because residential and commercial uses are consistent with the surrounding uses in the zone and area, which include residential and commercial office uses;
f) That the subject site is physically suitable for the proposed use, because parking and access have been designed to meet the development standards and code, as conditioned;
g) That the proposed project, as conditioned, will be compatible with existing and proposed future land uses in the H-WT Zone and the general area in which the proposed project is to be located, because mixed uses are conditionally permitted and compatible with the other uses permitted and located within the zone; h) That the proposed use, as conditioned, will encourage and be consistent with the orderly development of the City as currently exists, based on the current pattern of 123 188
development and land uses, and the use is consistent with the General Commercial (C-GEN) General Plan designation;
i) That the proposed use, as conditioned, will not discourage the appropriate existing or planned future use of the surrounding property or tenancies, because the proposed mixed uses are compatible with the existing uses and the planned future uses of the surrounding H-WT Zoned properties. The properties adjacent to the site include single family residential and commercial offices. The project, as conditioned meets and/or exceeds the objective development standards, applicable per State Density Bonus laws, related to this project;
j) That there will be adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development, as conditioned, is not detrimental to the public health and safety, because the project is located within an urbanized area, and the project is conditioned to enhance the existing infrastructure; k) That there will be adequate provisions for public access to serve the proposed use, because the project, as conditioned, shall provide a pedestrian walkway, driveway and on-site parking that meet objective development standards, subject to State Density Bonus law limitations;
l) That the location, size, design, and operating characteristics of the proposed use would not be detrimental to the public interest, health, safety, convenience or welfare, or to the property of persons, located in the area, because the project, as conditioned, meets and/or exceeds the objective development standards and code requirements, subject to State Density Bonus limitations; and m) That the proposed use, as conditioned, will not produce any or all of the following results:
1. Damage or nuisance from noise, smoke, odor, dust or vibration,
2. Hazard from explosion, contamination or fire,
3. Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles.
WHEREAS, the Planning Commission by the following roll call vote APPROVED CUP21-00018, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that CUP21-00018, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to allow the construction a new mixed-use development comprised of 20 senior citizen residential apartments and 1,608 square feet of commercial space, on property located within the R124 189 H Overlay in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in CUP21-00018 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if this Conditional Use Permit is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period of time as provided for in Section
92.27.1;
3. That all Conditions and Code requirements of Development Permit (DVP21-00001), Precise Plan of Development (PRE21-00009), and Division of Lot (DIV21-00009) shall be met; (Planning)
4. That a copy of all subject Adopted Planning Commission Resolutions, including the Conditions of Approval, shall be copied onto the final Building Plans associated with this project, to facilitate coordination and effective implementation of all Conditions of Approval; (Planning)
5. That the revised/approved Density Bonus incentives, concessions and waivers shall be provided on the final Building Plans, prior to Building Permit issuance; (Planning)
6. That the applicant shall defend, indemnify, and hold harmless the City of Torrance and its agents, officers, and employees from and against any claim, action, or proceeding against the City agency or its agents, officers, or employees to attack, set aside, void, or annul an approval by the City including, without limitation, an action by an advisory commission, appeal board, or legislative body concerning this discretionary approval.
The defense and indemnification shall include the payment of all legal costs incurred on behalf of the City in connection with the application, and the defense of any claim, action, or proceeding challenging the approval of CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009 or the project. The City will promptly notify the applicant of any claim, action, or proceeding and agrees to cooperate to the extent required for an effective defense. In the event a legal challenge to the discretionary approval is successful, and an award of attorney fees is made to the challenger, the applicant shall be responsible to pay the full amount of such an award; (Planning) 125 190
7. That the applicant shall submit, in order to ensure with compliance with Government Code Section 65915 (c)(1)(A) (or successor statue) a Density Bonus Housing Agreement or similar named agreement, complete with attachment and exhibits, as appropriate, to memorialize the approved density bonus allowance, incentives, concessions, waivers of development standards, parking allowances, development standards and uses, the City Monitoring Fee, and any other terms and conditions relative to the approved project. The applicant shall submit a draft Density Bonus Housing Agreement (DBH Agreement) no less than 90 days prior to the anticipated date for issuance of the first Building Permit for the project, and the DBH Agreement shall be final and executed by the applicant and the City, in recordable form, prior to issuance of the first Building Permit for the project. The DBH Agreement shall be presented to the Community Development Department and City Attorney's Office for review and approval and shall be in a form approved by the Community Development Department and City Attorney's Office, prior to issuance of the first Building Permit.
The DBH Agreement may be executed by the City Manager on behalf of the City, subject to any preference of the City Manager or legal requirement for the DBH Agreement to be approved by the City Council. The applicant may request from the City a form to be used for the DBH Agreement, and the applicant shall reimburse the City for the cost of legal review. The DBH Agreement shall be executed and recorded with the County of Los Angeles Recorder prior to occupancy of units; (Planning)
8. That the one (1) affordable unit reserved for a very low-income household shall remain affordable for 55 years from the date of initial occupancy. The applicant, property manager, or owner shall provide an annual compliance report to the Community Development Department including tenant income verification, rent rolls, and rent calculations including utility allowances; (Planning)
9. That for purposes of defraying City monitoring activities, the property owner shall pay a City Monitoring Fee annually. The City shall invoice the owner each year. Failure to issue an invoice waives payment for that year only. The monitoring fee and reporting requirements shall be included in the DBH Agreement; (Planning)
10. That during all construction activities, the applicant or developer shall provide a tollfree hotline for complaints. The hotline shall be staffed with a live operator who can immediately contact a construction supervisor. Signs displaying the hotline number shall be posted at the site perimeter before Grading Permit issuance; (Planning)
11. That the construction site shall be secured with decorative temporary fencing, maintained throughout construction to the satisfaction of the Community Development Director; (Planning)
12. That prior to the issuance of a Building Permit, the applicant shall enter into negotiations for the formation of, participate in, or annex into, a Community Facilities District (CFD) to fund a portion of the additional costs for ongoing City services, including but not limited to, road maintenance, park maintenance, lighting, and public 126 191
safety, to the satisfaction of the Community Development and Finance Directors; (Planning/Finance)
13. That a Phase I study shall be submitted, noting the status of the monitoring well/s onsite, and that their location shall be provided on the final Building Plans prior to Building Permit issuance; and that the Phase I study shall also show the mineral resources and any mitigation measures, prior to Building Permit issuance; (Planning)
14. That a site-wide signing, striping, and pavement marking plan shall be provided to distinguish guest/office and residential parking spaces, to show wayfinding and pedestrian pathway for pedestrians patronizing the office component and wayfinding for the residential component, for drive aisle/s, which includes stop/yield controls, directional signage, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits. All parking areas shall be striped with double lines
into and out of the parking stalls; (Transportation Planning)
15. That a parking plan shall be provided showing location of garage parking, striping dimensions, backup spacing, drive aisle throating, drive aisle widths and loading spaces, and include turnaround turning templates for regular vehicles and trucks entering the site, if all parking stalls are occupied, and show regular vehicles backing out of their spaces with oncoming traffic entering the garage, to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
16. That the loading space in the garage shall be revised or relocated to meet TMC with a 14-ft. height clearance and width of 10-ft. by a depth of 25-ft.; and that the outdoor loading space be relocated or redesigned to not provide a traffic collision conflict, with truck turning templates provided on the final Building Plans, prior to Building Permit issuance; (Planning)
17. by the Planning Manager, and indicated on the final Building Plans, prior to Building Permit issuance; (Planning)
18. That all storage areas shall be labeled and dimensioned indicating the space size per
19. That detailed plans of the trash room shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. That if the proposed trash room inside of the garage cannot be developed, that an exterior trash enclosure/s shall be located away from street frontage, and designed, bounded on three sides by solid masonry walls and shall be equipped with solid roll-up doors, decorative trellis, concrete stress pads to reduce pavement stress, bumpers, a rainwater intrusion barrier (solid roof) to meet the current National Pollutant Discharge Elimination System (NPDES) requirements, provide receptacles for the storage and 127 192
collection of trash and recyclable materials, and constructed of materials and of a design and color that are architecturally compatible with the building to the satisfaction of the Community Development Director; (Planning)
20. prior to Building Permit issuance, to the satisfaction of the Community Development Director; (Planning)
21. That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; (Planning)
22. That a roof plan shall be submitted to the Community Development Director for approval prior to the issuance of any Building Permits. The roof plan shall ensure all roof appurtenances, such as ducts and vents, mechanical equipment, electrical boxes, meters, pipes, transformers, air conditioners and any and all other equipment on the roof shall be completely screened from public view and surrounding properties by parapet walls, designed as an integral part of the façade, to the satisfaction of the Community Development Director. Such equipment or screening material shall be constructed in such a manner that noises emanating from the roof appurtenances shall not be audible beyond the property lines; (Planning)
23. That a complete roof plan noting the varying heights of the parapet shall be provided on the final Building Plans to the satisfaction of the Community Development Director, prior to Building Permit issuance; (Planning)
24. That all windows/glazing fronting on Hawthorne Blvd. shall be provided with a protective film or other technology to prevent graffiti; (Planning)
25. That the usable common open space areas shall be specified with actual designated recreational activities and dimensioned on the final Building Plans, prior to Building Permit issuance; (Planning)
26. That elevations and details of any freestanding walls, fences, gates, railings, etc., shall be provided on the final Building Plans, and provide their individual heights, and that the satisfaction of the Community Development Director; (Planning)
27. That all electrical switchgear cabinets, fire risers, etc., shall be designed within the interior of the subject buildings, and shall be shown on the final Building Plans, and that any exterior doors/walls for this equipment shall be designed as an integral part of the façade, matching color and materials to the satisfaction of the Community Development Director; (Planning)
128 193
28. That electrical transformers shall not be located within the front setback areas of Hawthorne Boulevard, and that applicant shall continue to work with Fire, Engineering and Planning Staff for the siting and painting of all exterior equipment, including, but not limited to, electrical transformers and double-check detectors/backflow assembly equipment, and shall be shown on the final Building Plans; and that any equipment that is required to be sited aboveground shall be screened with enclosures that match the materials and finishes of the building façade and/or vegetation to the satisfaction of the Community Development Director, and shall be shown on the final Building Plans and Landscaping Plans; (Planning)
29. That no outdoor or exterior telephones, vending machines, kiosks, storage containers, publication racks, collection and/or donation bins, etc., shall be permitted on-site; (Planning)
30. That the amount of landscaping area shall be indicated on the final Building Plans, prior to Building Permit issuance and shall correspond with any LPR application; (Planning)
31. That the applicant shall provide landscape area/coverage calculations on the final of five percent (5%) of its parking lot surface areas, per Code, to the satisfaction of the Community Development Director, and that the applicant shall continue to work with Staff on providing additional landscaping areas, and that they shall be incorporated into the final landscaping plan; (Planning)
32. That a Landscape Plan Review (LPR) entitlement shall be required, including a landscape plan, and shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits associated with the subject project. The landscape plan shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. The plan shall utilize drought resistant/xeriscape California friendly vegetation, shade-producing trees, and shall provide state-of-the-art water saving irrigation system and/or drip irrigation for all landscape areas. That trash enclosures, transformers, all aboveground equipment and parking lot shall be screened with vegetation of sufficient height and texture to provide an effective screen, to the satisfaction of the Community Development Director, including vegetation screens from headlights positioned toward the adjacent uses and street frontages. The landscape plan shall include the off-site parkways on Hawthorne Boulevard and shall be implemented prior to occupancy and shall be maintained to the satisfaction of the Community Development Director. That the landscape plan shall comply with the current State Water Efficient Landscape Ordinance; (Planning)
33. That an exterior photometric and lighting plan, in compliance with the latest California Green Code (CGC) shall be submitted to the Community Development Director for approval, prior to the issuance of any Building Permits, associated with the subject project, and shall be designed to provide ratings of zero at property lines. The lighting 129 194
plan shall ensure that all exterior doorways, parking spaces, and pedestrian walkways are provided with adequate illumination, security lights shall be non-glaring, all building lighting shall be properly shielded and designed to prevent excess lighting and glare onto adjacent uses and public streets, to the satisfaction of the Community Development Director; (Planning)
34. That any future request for a Wireless Antenna Facility shall require a separate approval and would provide for all related equipment cabinets to be located within the existing structure or undergrounded; (Planning)
35. That within 30 days of the final public hearing, the applicant shall return and stake to Planning (provided there is no appeal); (Planning)
36. That project shall comply with Tier 1 Level Green Code requirements; (Building Regulations)
37. That a CASp Report with full compliance shall be provided, prior to final inspection; (Building Regulations)
38. That the engineer / contractor shall coordinate with the appropriate utility companies to relocate power poles which would interfere with the street improvements in the public right of way on Hawthorne Boulevard.; (Engineering)
39. That the proposed driveways on Hawthorne Blvd. shall be constructed to a commercial radius type driveway minimum 30 feet wide, with depressed back of walk, and wheelchair ramps; (Engineering)
40. That a minimum 10' wide level area is required behind the sidewalk before sloping down toward the subterranean garage; (Engineering)
41. That a turning template study for the proposed driveway is required to demonstrate that vehicles are able to turn into the subterranean garage. The study shall be submitted to and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit; (Engineering)
42. That a hydrology study is needed to determine the height of hike up behind the 10' wide level area behind the north driveway apron. The study shall demonstrate the public storm water which runs down Hawthorne Boulevard will not flow into the subterranean garage. Approval of the study is required prior to issuance of Grading Permit; (Engineering)
43. That all proposed and/or existing water meters larger than 2", double check detector assemblies and reduce pressure backflow assemblies shall be located above ground on private property near the public right-of-way. Final location and access shall be approved by the Community Development Department and incorporated into the onsite landscaping plan prior to Building Permit issuance; (Engineering) 130 195
44. That the project shall be supplied by master public water meter with privately owned, operated, maintained and administered submastering system for each dwelling unit per California Senate Bill 7, WOLK; (Engineering)
45. That one fire hydrant shall be installed near the proposed driveway approach; (Engineering)
46. That a hydrology study is needed to determine the height of hike up behind the 10' wide level area behind the proposed driveway apron. The study shall demonstrate that the public storm water which runs down Hawthorne Blvd. will not flow into the subterranean garage. Approval of the study is required prior to issuance of Grading Permit; (Engineering)
47. That the applicant/developer shall design and construct 8" VCP mainline sewer and connection to existing public sewer main per public standards. The sewer plans, prepared by a professional engineer, shall be submitted by the applicant/developer to the Engineering Division of Community Development Department for review and approval prior to issuance of grading permit. Sewer main shall be constructed prior to occupancy; (Engineering)
48. That the applicant shall submit a sewer study discussing the new development's impact on the existing downstream public sewer mains. The study shall include flow monitoring data and be approved by the Engineering Division of the Community Development Department prior to issuance of a grading permit. The applicant shall design and construct improvements to the public sewer system as per recommendations of the approved study prior to occupancy; (Engineering)
49. Submit a noise attenuation plan to the satisfaction of the Environmental Division. The recommendations of the Noise Study/Noise consultant shall be adhered to and incorporated into plans submitted to the City of Torrance. Plans shall show how noise recommendations will mitigate noise, so that when completed, this use will comply with the TMC & will not disturb neighboring properties; (Environmental)
50. All signs (new, modified or revised) must be approved by the Environmental Division with appeal rights to the Planning Commission, or comply with the previously approved sign program; (Environmental)
51. Provide 9" (minimum) contrasting address numerals for non-residential uses; (Environmental)
52. Provide bike rack(s). Applicant shall install on-site bicycle racks and submit placement plan and bicycle rack detail, to the satisfaction of Environmental Division; (Environmental)
53. Guest parking stalls are reserved for guests and shall remain guest parking. Guest stalls shall be clearly marked; (Environmental)
131 196
54. Provide a mail kiosk and unit location map; (Environmental)
55. Verify 25' turning radius from jamb of garage door; (Environmental)
56. All trash shall be kept in an enclosure that is bounded on three sides by a decorative wall, decorative trellis and solid doors and shall be constructed of materials and of a design, color and texture which is architecturally compatible with the buildings and structures on the property; (Environmental)
57. The trash enclosure shall have a metal barrier roof covering to prevent rainwater intrusion to meet current NPDES requirements; (Environmental)
58. Provide bins/containers within trash enclosure for the storage and retrieval of trash and recyclable materials; (Environmental)
59. Upon completion of the project, the applicant shall hire a Certified Access Specialist (CASp) to verify that project(s) are in compliance with California Building Code (CBC).
All deficiencies shall be addressed to the satisfaction of the Building Official; (Grading)
60. The applicant shall continue to work with staff regarding the geotechnical report.
Geotechnical report shall be prepared per LA County soils report preparation manual, CBC, TMC and to the satisfaction of the building official; (Grading)
61. That the business name and address shall be visible from street; (Police)
62. That non-glare security lighting shall be installed for the parking lot; (Police)
63. That four-foot tall address numerals shall be painted on rooftop for aerial identification; (Police)
64. That secured property shall provide Knox Box lock access for Police and Fire, and includes any secured parking garage gates and common entry doors to the property; and (Police)
65. That a site map at entrance of multi-unit residential community or business park which identifies unit addresses and locations shall be provided, and that posting of site map/unit directory shall be provided at lobby elevator and main pedestrian entrances to expedite emergency response; (Police)
66. main fairway; (Police)
67. That all security camera footage shall be maintained in proper working order at all times, and that recorded footage shall be made available to the Torrance Police Department upon request; (Police)
132 197
68. That surveillance footage shall be stored for a minimum of sixty (60) days, of parking garage, secured common and commercial area entrances and primary pedestrian walkways, and that the Torrance Police Department strongly recommends that the video surveillance system be Open Network Video Interface Forum (ONVIF) compatible; (Police)
69. That project shall provide collection for refuse, organic material and recycling per State Law SB1383; and (Public Works Sanitation)
70. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 19th day of November 2025. __________________________________ Chairman, Torrance Planning Commission
ATTEST: __________________________________ Secretary, Torrance Planning Commission 133 198
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 19th day of November 2025, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
__________________________________
Secretary, Torrance Planning Commission
134 199
PLANNING COMMISSION RESOLUTION NO. 24-022
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
TORRANCE, CALIFORNIA, APPROVING A DEVELOPMENT PERMIT, IN
CONJUNCTION WITH A SERIES OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9, CHAPTER 1, ARTICLE 45 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSTRUCTION OF A NEW SENIOR CITIZEN
MIXED-USE DEVELOPMENT ON PROPERTY LOCATED WITHIN THE R-H
DISTRICT, IN THE H-WT ZONE ON THE EAST SIDE OF HAWTHORNE BOULEVARD APPROXIMATELY 200 FT NORTH OF ROLLING HILLS ROAD.
DVP21-00001: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Development Permit (DVP21-00001) in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547- 004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DVP21-00001 in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 5, Article 1 of the Torrance Municipal Code (TMC); and WHEREAS, in fill development is categorically exempt by the 2025 Guidelines of Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15332, Class 32; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
135 200
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed senior citizen mixed-use project, as conditioned, is consistent with the purpose and requirements of the H-WT, complies with all objective applicable provisions of the Hawthorne Boulevard Corridor Specific Plan, and as conditioned, is consistent with the objectives, policies, and programs of the General Plan and with the land use designation of General Commercial (C-GEN), and objective land use code; d) That the proposed development, as conditioned, conforms with all objective applicable design guidelines, design review criteria and landscaping guidelines of the Hawthorne Boulevard Corridor Specific Plan;
e) That the subject site is physically suitable for the type and intensity of development, and for the types of land uses being proposed, because the project meets and/or exceeds the objective development standards;
f) That by virtue of high-quality design and construction, the proposed development will positively contribute to the orderly and harmonious development of the Hawthorne Boulevard Corridor and the general welfare of the City, as conditioned, it will be implementing the objective District design guidelines;
g) That the proposed development will enhance the commercial development of the area, so as to increase the taxable value of real property and sales tax return to the City, and to maintain the stability and value of the property and of the Hawthorne Boulevard Corridor, as a desirable commercial area, as it will provide services to the residents and commercial businesses;
h) That traffic impacts have been mitigated, in whole or in part by the design of the on-site circulation system, so as to minimize hazard and congestion, to facilitate on-site movements between adjacent properties, and to maximize opportunities for pedestrian and transit connections, via pedestrian access provision of only one curb cut on Hawthorne Boulevard, and widening the street at the site via a six-foot easement along the frontage;
i) That there are adequate provisions for water, sanitation, and public utilities and services to ensure that the proposed development is not detrimental to public health and safety, as the site is located in an area surrounded by urban uses; j) That the proposed development is consistent with the objectives, policies, general land uses and programs of the Torrance General Plan, as conditioned; k) That the proposed development would not be detrimental to the public interest, health, safety, convenience or welfare, as it complies with all required objective development standards, as conditioned; and
l) That the proposed development meets the requirements of the CEQA, under Categorical Exemptions Section 15322.
136 201
WHEREAS, the Planning Commission by the following roll call vote APPROVED DVP21-00001, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that DVP21-00001 filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to allow the construction of a new senior citizen mixed-use development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard approximately 200 ft. north of Rolling Hills Road, on file in the Community Development Department of the City of Torrance, is hereby approved subject to the following conditions:
1. That the development and use of the subject property for a new senior citizen mixed-use development shall be subject to all conditions imposed in Planning Commission case DVP21-00001; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DVP21-00001 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1; and
3. That the applicants shall comply with all conditions and code requirements of CUP21- 00018, PRE21-00009 and DIV21-00009.
4. shall be provided on the final Building Plans prior to Building Permit issuance to the satisfaction of the Community Development Director; (Planning)
5. That no chain link fence or similar fence type shall be permitted outside of the buildings, nor visible from any public Rights-of-Way; (Planning)
6. That the pedestrian pathway connections made from the sidewalks along Hawthorne Boulevard to the building shall feature a decorative element, such as stamped concrete or pavers, to the satisfaction of the Community Development Director, and shall be continually maintained; (Planning)
137 202
7. That the applicant shall provide samples of all the final exterior color and materials, including, but not limited to, a detail of the building perimeter, finishes, hardware, gates, fences, freestanding walls, site amenities, and pathways, to assure the development has a cohesive design and finish, and that the H-WT District Color of Indigo Blue (Pantone hardware amenities, to the satisfaction of the Community Development Director, prior to the issuance of any Building Permits; and (Planning)
8. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 19th day of November 2025. __________________________________ Chairmen, Torrance Planning Commission ATTEST: __________________________________ Secretary, Torrance Planning Commission 138 203
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 19th day of November 2025, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
Secretary, Torrance Planning Commission
139 204
PLANNING COMMISSION RESOLUTION NO. 24-023
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TORRANCE, CALIFORNIA, APPROVING A PRECISE
PLAN OF DEVELOPMENT, IN CONJUNCTION WITH A SERIES
OF ENTITLEMENTS, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 1, ARTICLE 41 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW A NEW SENIOR CITIZEN MIXED-USE
DEVELOPMENT ON PROPERTY LOCATED WITHIN THE
HILLSIDE OVERLAY DISTRICT IN THE HAWTHORNE
BOULEVARD CORRIDOR SPECIFIC PLAN ON THE EAST SIDE
OF HAWTHORNE BOULEVARD, APPROXIMATELY 200 FEET
NORTH OF ROLLING HILLS ROAD.
PRE21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Precise Plan of Development (PRE21-00009) in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs: 7547-004-040 through 7547- 004-046), referred to as the Walteria Terrace Garden Project; and WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of a Precise Plan of Development in conjunction with series of entitlements to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the HWT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and
WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 1, Article 41 of the TMC; and WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
140 205
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed construction of a new senior citizen mixed-use project, as conditioned, is Categorically Exempt by the 2025 Guidelines for Implementation of the California Environmental Quality Act (CEQA), Article 19, Section 15322; d) That the proposed new senior citizen mixed-use project Code Section 65589.5, and therefore only the objective development standards of the TMC can be applied for purposes of evaluating the proposed project; and e) That the proposed project complies with the objective development standards of the RH, as set forth in Article 41, Chapter 1, of Division 9, the R-3 Zone (Senior Citizen), as set forth in Article 7, Chapter 1, Division 9, Senior Citizen Housing Article 3, Chapter 5, of Division 9, and the H-WT Zone, Article 36, Chapter 2, Division 9, of the TMC, and is consistent with the City of Torrance General Commercial (C-GEN) General Plan land use designation.
WHEREAS, the Planning Commission by the following roll call vote APPROVED PRE21-00009, subject to conditions:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that PRE21-00009, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), to allow a new senior citizen mixed-use development on property located within the R-H in the H-WT Zone on the east side of Hawthorne Boulevard, approximately 200 ft. north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the use of the subject property for a senior citizen mixed-use development shall be subject to all conditions imposed in PRE21-00009 and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section
92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, 141 206
specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if this PRE21-00009 is not used within one year after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.27.1;
3. That the applicants shall comply with all conditions and code requirements of CUP21- 00018, DVP21-00001 and DIV21-00009; (Planning)
4. That the maximum height of the addition at the highest point of the roof shall not exceed a height of 42 - , as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 207.50 ft. (located at the northwest corner of the garage level), based on a benchmark elevation of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
5. That the final height of the structure shall be certified by a licensed surveyor/engineer prior to requesting a framing or roof-sheathing inspection and shall not exceed a survey elevation of - . for the highest ridge, based on the benchmark of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Blvd., as shown on the official survey map on file in the Community Development Department, and verifies the entire roof framing and design remains consistent with the elevation heights and roof design approved by the Planning Commission; (Planning)
6. That the maximum height of the addition at the highest point of the roof shall not exceed a height of - at the southwest corner of the building structure (stairwell), as represented by the survey elevation of 250.00 ft. for the highest ridge, based on the lowest adjacent grade of 222.00 ft. (located at the southwest corner of the adjacent exterior grade), based on a benchmark elevation of 178.79 ft. located within the public right-of-way near the southwest corner of Via Valmonte and Hawthorne Boulevard, as shown on the official survey map on file in the Community Development Department; (Planning)
7. That detailed plans for any proposed freestanding on-site walls, fences, gates or retaining walls shall be required, prior to Building Permit issuance; (Planning)
8. That any cabinets, storage shelves, appliances or equipment located within the garage shall be shown on the final Building Plans, and shall not encroach within the minimum interior dimensions, to the satisfaction of the Planning Manager, prior to the issuance of any Building Permits; (Planning)
142 207
9. That the final Building Plans shall label any fireplaces, chimneys, vents, solar panels, skylights, or any other equipment, on the elevations and roof plan, prior to Building Permit issuance, to the satisfaction of the Planning Manager; (Planning)
10. That the silhouette shall remain in place for at least 15 days through the appeal period, but no more than 45 days after the final public hearing to the satisfaction of the Planning Manager; (Planning)
11. "Public Notice" sign to the satisfaction of the Planning Manager; (Planning)
12. That a copy of the adopted Resolution/s for this project, including all Conditions of Approval, shall be copied onto the final Building Plans, to the satisfaction of the Planning Manager; and (Planning)
13. That all conditions of other City Departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 19th day of November 2025. __________________________________ Chairman, Torrance Planning Commission ATTEST: __________________________________ Secretary, Torrance Planning Commission 143 208
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 19th day of November 2025, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: __________________________________ Secretary, Torrance Planning Commission 144 209
PLANNING COMMISSION RESOLUTION NO. 24-024
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF TORRANCE, CALIFORNIA, APPROVING A
DIVISION OF LOT, AS PROVIDED FOR IN DIVISION 9,
CHAPTER 2, ARTICLE 29 OF THE TORRANCE MUNICIPAL
CODE TO ALLOW THE CONSOLIDATION OF SEVEN LOTS
INTO ONE LOT IN CONJUNCTION WITH A SERIES OF
ENTITLEMENTS TO ALLOW THE CONSTRUCTION A NEW
SENIOR CITIZEN MIXED-USE DEVELOPMENT ON
PROPERTY LOCATED WITHIN THE HILLSIDE OVERLAY
DISTRICT (R-H) IN THE HAWTHORNE BOULEVARD
CORRIDOR SPECIFIC PLAN-WALTERIA SUB-DISTRICT
(H-WT) ON THE EAST SIDE OF HAWTHORNE
BOULEVARD, APPROXIMATELY 200 FEET NORTH OF
ROLLING HILLS ROAD.
DIV21-00009: ZEINA AWAD
(MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) WHEREAS, the Planning Commission of the City of Torrance at its meeting of April 17, 2024, conducted a duly noticed public hearing to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of Division of Lot (DIV21-00009) to allow the consolidation of seven lots into one lot, in conjunction with series of entitlements, to allow the construction of a new senior citizen mixed-use development, on property located within the Hillside Overlay District (R-H) in the Hawthorne Boulevard Corridor Specific Plan-Walteria Sub-District (H-WT) on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road (APNs:
7547-004-040 through 7547-004-046), referred to as the Walteria Terrace Garden Project; and
WHEREAS, the Planning Commission on April 17, 2024, continued the item indefinitely; and
WHEREAS, the Planning Commission of the City of Torrance conducted a public hearing on November 19, 2025, to consider an application filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust), for approval of DIV21-00009 to allow the consolidation of seven lots into one lot, in conjunction with series of entitlements, to allow the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road; and WHEREAS, due and legal publication of notice was given to owners of property in the vicinity thereof and due and legal hearings have been held, all in accordance with the provisions of Division 9, Chapter 2, Article 29 of the Torrance Municipal Code (TMC); and 145 210
WHEREAS, pursuant to the California Environmental Quality Act (CEQA) Guidelines for Implementation, Article 19, Section 15315, Class 15, Minor Land Division projects are declared categorically exempt; and
WHEREAS, the Planning Commission of the City of Torrance does hereby find and determine as follows:
a) That the property is located on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road;
b) That the property is further described as portions of Lots 1-4 in Block 13 of Walteria and vacated streets, California Avenue and Canyon Road, (APNs: 7547-004-040 through 7547-004-046);
c) That the proposed Division of Lot, as conditioned, together with provision for its design and improvement, is consistent with the H-WT Zone;
d) That the proposed consolidation of lots, in conjunction with the senior citizen mixeduse development project is conditionally permitted within the R-H District in the H-WT Zone;
e) That the site is physically suitable for the proposed type and density of development, and the subdivision to allow for lot consolidation, as conditioned, because the proposed project is conditionally permitted win the H-WT Zone, and the resulting parcel meets the development standards for size in the H-WT Zone; f) That the proposed subdivision will not interfere with the orderly development of the City, because, as conditioned, it will incorporate a high-quality design that is compatible with similar developments in the City of Torrance; g) That the subdivision request is categorically exempt per the CEQA, 2025 Guidelines for Implementation, Article 19, Section 15315, Class 15, Minor Land Division; h) That the subdivision, as conditioned, will not produce any or all of the following results:
Damage or nuisance from noise, smoke, odor, dust or vibration, Hazard from explosion, contamination or fire,
Hazard occasioned by unusual volume or character of traffic or the congregating of large numbers of people or vehicles; and
i) That the design of the development and subdivision, as conditioned, will not conflict with any public access or easements, as all means of public access are being improved.
WHEREAS, the Planning Commission by the following roll call vote APPROVED DIV21-00009, subject to conditions:
146 211
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
NOW, THEREFORE, BE IT RESOLVED that DIV21-00009, filed by Zeina Awad (Mahmoud H. Awad Trustee for the Mahmoud and Nawal Awad Trust) to approve a Division of Lot in conjunction with series of entitlements to allow the consolidation of seven lots into one lot, in conjunction with the construction of a new senior citizen mixed-use development, on property located within the R-H in the H-WT on the east side of Hawthorne Boulevard, approximately 200 feet north of Rolling Hills Road, is hereby APPROVED subject to the following conditions:
1. That the lot consolidation, development and use of the subject space as a senior citizen mixed-use development shall be subject to all conditions imposed in DIV21- 00009; and any amendments thereto or modifications thereof as may be approved from time to time pursuant to Section 92.28.1 et seq. of the TMC on file in the office of the Community Development Director of the City of Torrance; and further, that the said use shall be established or constructed and shall be maintained in conformance with such maps, plans, specifications, drawings, applications or other documents presented by the applicant to the Community Development Department and upon which the Planning Commission relied in granting approval;
2. That if DIV21-00009 is not used within two years after granting of the permit, it shall expire and become null and void unless extended by the Community Development Director for an additional period as provided for in Section 92.29.13;
3. That all Conditions and Code requirements of CUP21-00018, DVP21-00001 and PRE21-00009 shall be met; (Planning)
4. That centerline ties be filed with and checked by the Community Development Department, Engineering Division; (Engineering)
5. That a lot tie agreement shall be recorded providing that multiple lots underlying this property shall not be sold, leased, or financed separately. The lot tie agreement shall be recorded prior to granting of any Building Permits and Final Parcel Map shall be recorded prior to occupancy; and (Engineering)
147 212
6. That all conditions of all other City departments received prior to or during the consideration of this case by the Planning Commission shall be met.
Introduced, approved and adopted this 19th day of November 2025. __________________________________ Chairman, Torrance Planning Commission ATTEST: __________________________________ Secretary, Torrance Planning Commission 148 213
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) ss
CITY OF TORRANCE )
I, ROBERT GARCIA, Secretary to the Planning Commission of the City of Torrance, California, do hereby certify that the foregoing resolution was duly introduced, approved, and adopted by the Planning Commission of the City of Torrance at a regular meeting of said Commission held on the 19th day of November 2025, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: __________________________________ Secretary, Torrance Planning Commission 149 214
150 215
151 216
152 217
CODE REQUIREMENTS
The following is a partial list of code requirements applicable to the proposed project. All possible code requirements are not provided here and the applicant is strongly advised to contact each individual department for further clarification. The Planning Commission may not waive or alter the code requirements. They are provided for information purposes only.
Building Regulations
1. Comply with current CA State Codes.
Engineering Permits & Records
(Conditional Use Permit)
2. A Construction and Excavation Permit (C&E Permit) is required from the Community Development Department, Engineering Permits and Records Division, for any work in the public right-of-way on Hawthorne Blvd. (City Code Sec. 74.6.2)
3. Grant a 6' wide public street and highway easement along the project frontage on Hawthorne Blvd.
4. Design and construct curb & gutter, 4' wide sidewalk, driveway aprons, make-up paving and 4' wide irrigated parkway adjacent to curb for the length of the property frontage as per City approved plans; Curb shall be moved 6' east from the existing curb along frontage with reverse curve transition. Plans to be submitted by developer and approved by the Engineering Division of the Community Development Department prior to issuance of Grading Permit.
5. Install a street tree in the City parkway every 50' for the width of this lot on Hawthorne Blvd. (City Code sec. 74.3.2). Contact the Streetscape Division of the Torrance Public Works Department at 310-781-6900 for information on the type and size of tree for your area.
6. That on-site drainage shall be collected within the lot and drained through the curb to the public street on Hawthorne Blvd or obtain drainage easements from adjacent private property owners to drain through the curb on Eleda Drive. (City Code Sec. 81.2.52) (Division of Lot)
7. Required public Street and Highway easement shall be shown on Final Parcel Map.
8. Required additional Street and Highway easement shall be shown on Final Parcel Map.
9. Final Parcel Map must record prior to obtaining occupancy permits.
10. All Final Parcel Maps are to be compiled from field survey data unless otherwise approved by the City Engineer. (City Code Section 92.29.7)
11. All physical public improvements which are conditions of this Planning Case must be completed prior to occupancy.
Engineering Water
12. Must comply with the City of Torrance Municipal Code, the California Administrative Code, Title 17-Public Health Code regarding domestic water cross-connection control.
13. Public water facilities needed to serve this site, including as applicable, mains and appurtenances shall be constructed at the cost of applicant/owner per Torrance Municipal Water (TMW) plans and specifications. TMWD shall make final determination/approval for location, type, and size of all water facilities.
14. That separate meters shall be provided for each commercial unit and for common use (irrigation, maintenance, etc).
153 218
15.Extend 8" DIP water main approximately 400' across property frontage along east side of Hawthorne Blvd, then cross street to join existing water main in west side of Hawthorne Blvd.
Environmental
16. Bedroom sizes to be as determined per Torrance code (92.20.2).
17. Lot sweeping, deliveries and trash pick-up are prohibited between 10 P.M. And 7 A.M. per Torrance code (92.30.4).
18. The Van Accessible loading area shall be at least 8 feet wide and the words "NO PARKING" shall be painted on the ground within each loading access aisle in white lettering no less than 12 inches high and located so that it is visible to traffic enforcement officials.
19. The property shall be landscaped prior to final inspection per Torrance code(92.21.9).
20. Direct lighting away from residential land uses per Torrance code(92.30.5).
21. No illegal signs, A-frames, banners, bow banners, balloons, sign holders/twirlers, etc. are permitted.
22. Residential parking stalls next to walls shall be a minimum of 10-ft. Wide per Torrance code (93.5.2).
23. Double-line stripe all parking spaces per Torrance code (93.4.6).
24. Screen all roof equipment from public view per Torrance code (92.30.2).
25. Provide 200 cubic feet of storage area per unit in garage area (R-3) per Torrance code (93.5.11).
Fire Prevention
26. The Torrance Fire Department Operations Manual Access Roadways for Fire Apparatus Fire Lanes will apply.
27. Separate submittals for fire sprinkler underground, fire sprinkler, fire alarm will be required.
Grading
28. The applicant shall apply for a grading permit and provide precise grading plan prepared by a Registered Civil Engineer for approval by the Building and Safety Division. The plans shall address the specific grading, drainage, and geotechnical design parameters for design of the proposed construction. The plans should include, but not be limited to: specific elevation grades, keyways, subdrains, limits of removals, retaining walls callouts every 15 to 30 feet, and other information necessary to establish in detail the horizontal and vertical geometric design. The plans shall reference the approved geotechnical report, and reflect cut, fill, compaction and over-excavation requirements contained therein. The plans shall reflect all proposed drainage facilities, including storm drains, area drains, catch basins/inlets, swales, and other drainage devices necessary for the interception, conveyance and disposal of on-site and offsite drainage consistent with the project drainage report per TMC 81.2.49 (J103) and TMC
81.2.50(J104). Precise grading plan shall detail compliance paths of travel, accessible parking stalls per 2022 California Building Code (CBC) 11B-201
29. The applicant shall submit a detailed geotechnical report prepared by a registered design professional. The geotechnical report must specifically address the proposed improvements including engineering calculations for all graded slopes, foundations, retaining walls, temporary excavations and other aspects as required by the proposed 154 219
development. The report shall present detailed geotechnical recommendations for design and construction of the proposed project and improvements. The reports should be in accordance with the County of Los Angeles standards and to the satisfaction of the City of Torrance Building and Safety Division standards and requirements. TMC
81.2.50 and CBC 1803. Slope setbacks shall comply with 2022 California Building Code section 1808.7.
30. The applicant shall have a final drainage study prepared by a Registered Civil Engineer.
The drainage study shall be prepared in report format and include sections addressing on-site and off-site drainage areas, existing and developed conditions hydrology, the design hydraulics for the on-site drainage system, including sizing of inlets, conduits, vditches, down drains and other structures, and associated calculations and conclusions. The drainage study shall demonstrate project compliance with the current Los Angeles County Public Work Department's Hydrology Manual and Hydraulic Design Manual; however the minimum design flow for sizing onsite drainage devices shall be 25 year recurrence (Q25) or 50 year storm for sump conditions. The drainage study shall be submitted to the Building and Safety and approved by the Building official prior the issuance of a grading permit Per TMC 81.2.50 (J104.9)
31. All drainage shall be sloped 2% away from all parts of building structures along impervious surface and 5% away along pervious surface, in conformance with California Building Code; and conveyed through an on-site storm drain system to an approved point of disposal (i.e. street) per CBC 1804.4 and TMC 81.2.51 (J107.6)
32. Drainage plans shall incorporate appropriate post-construction best management practices (BMPs) into the design of the project and must be prepared and approved prior to issuance of any grading permit per TMC 411.1.050. Please refer to the Los Angeles County Low Impact Development (LID) Manual for applicable design requirements. The project-specific LID plans shall describe how this project design conforms to all requirements set forth in the LID manual and must include a fully executed and recorded LID covenant to provide for on-going maintenance of the BMPs that have been chosen. Stormwater quality design volume (SWQDv) shall be retained onsite per TMC 411.1.070.
33. Per TMC 410.1.070 the owner/owner's agent shall submit erosion control plan to Building and Safety review and approval from Building Official to ensure the following minimum requirements are effectively implemented at the construction site:
34. Sediments generated on the project site shall be retained using adequate Treatment Control or Structural BMPs;
35. Construction-related materials, wastes, spills, or residues shall be retained at the project site to avoid discharge to streets, drainage facilities, receiving waters, or adjacent properties by wind or runoff;
36. Non-storm water runoff from equipment and vehicle washing and any other activity shall be contained at the project site; and
37. Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as the limiting of grading scheduled during the wet season; inspecting graded areas during rain events; planting and maintenance of vegetation on slopes; and covering erosion susceptible slopes.
38. Cover sheet of construction document shall include area (acres) of disturbed soil, disturbed soil 1 acre or more required the owner to file a Notice of Intent with the Division of Water Quality of State Water Resources Control Board and prepare a SWPPP per TMC 410.1.070.
155 220
39.All undocumented fill shall be removed, until competent native soils have reached, and recompacted from property line to property line. TMC 81.2.50(J104.5)
40. Retaining wall proposed to accommodate the cuts and fills shall obtain separate building permit from Building and Safety Division per CBC 105, TMC 81.2.47 (J101.3.1) and TMC 81.2.49(J103).
41. All lots shall have a minimum grade of 1%. The lot shall be graded to drain to the street per TMC 81.2.51(J107.6)
42. Ponding of water shall not be permitted to occur on pavement, concrete or in landscape areas per 81.2.52
43. That the proposed driveway shall not exceed the maximum grades of 20% and 10% cross-slope. The algebraic difference in grade between any two (2) adjacent six (6) foot per TMC 93.4.5. Proposed grades shall be shown on Grading Plan and approved by the Building and Safety Division prior to the issuance of Grading Permit.
Planning
44. Front, side and rear setbacks shall be the same as the R-3 zone, but may be required to be greater by the Planning Commission, or City Council on appeal (TMC
95.3.45.a.6).
45. The minimum size for one (1) bedroom dwelling units is 500 sq. ft. (TMC
95.3.45.a.3.B)
46. For senior citizen housing, there shall be provided one (1) parking space per dwelling unit plus no less than one (1) additional visitor parking space for each five (5) dwelling units (TMC 93.2.3.g).
47. One off street loading space shall be provided and maintained on the same lot for every separate occupancy requiring delivery of goods and having a floor area of less than ten thousand (10,000) square feet. Each required off street loading space shall be not less than ten (10) feet in width and twenty-five (25) feet in length, with a minimum height clearance of fourteen (14) feet and shall be so arranged that it will not impede traffic circulation within the parking area or will not block parking stalls. Where the occupancies are integrated or connected in design, loading space area may be based solely on the floor area involved without reference to separate occupancy (TMC 93.3.1)
48. Where covered parking is required for three (3) or more dwelling units, there shall be provided a minimum of two hundred (200) cubic feet of lockable, enclosed storage space for each dwelling unit (TMC93.5.11.a)
Public Works - Streetscape
49. Plant 24 box Crape Myrtle Muskogee street trees in new parkway. Call Streetscape Division for specific number of trees and locations.
156 221
157 222
158 223
159 224
160 225
161 226
162 227
163 228
164 229
165 230
166 231
167 232
168 233
169 234
170 235
171 236
172 237
173 238
174 239
175 240
176 241
177 242
178 243
179 244
180 245
181 246
182 247
183 248
184 249
185 250
186 251
187 252
188 253
189 254
190 255
191 256
192 257
193 258
194 259
195 260
196 261
197 262
newmeyerdillion.com
198 263
199 264
newmeyerdillion.com
200 265
201 266
202 267
203 268
204 269
205 270
newmeyerdillion.com
206 271
207 272
208 273
209 274
210 275
211 276
1000 Wilshire Boulevard
Suite 1500
Los Angeles, CA 90017
VIA EMAIL COMMUNITY DEVELOPMENT [email protected]
[email protected]
212 277
1. The Project Is Protected by the Housing Accountability Act.
Id.
Id
arise
infrequently
213 278
Id
Id
2. The Project Is Subject to the State Density Bonus Law.
Latinos Unidos Del Valle
De Napa Y Solano v. County of Napa
Latinos Unidos Del Valle De Napa y Solano v. County of Napa supra Bankers Hill 150 v. City of San
Diego
3. The City Is Prohibited from Delaying the Project.
Id.
Id.
214 279
215 280
216 281
217 282
218 283
219 284
220 285
221 286
222 287
223 288
ITEM 8A
ATTACHMENT 10
Technical Studies
(https://bit.ly/EnvironmentalDocuments)
ITEM 8A
ATTACHMENT 10
224 289
ITEM 8A
ATTACHMENT 11
Project Plans
ITEM 8A
ATTACHMENT 11
225 290
226 291
227 292
228 293
229 294
230 295
231 296
232 297
233 298
234 299
235 300
236 301
237 302
238 303
239 304
240 305
241 306
242 307
ITEM 8A
ATTACHMENT 3
Correspondence
ITEM 8A
ATTACHMENT 3
243 308
244 309
245 310
246 311
247 312
248 313
249 314
250 315
251 316
252 317
1 Gomez, Yolanda
From: Garcia, Robert
Sent: Wednesday, November 19, 2025 8:02 AM
To: Gomez, Yolanda
Subject: Fw: Public Comment - CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009: ZEINA AWAD (MAHMOUD H. AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) - Rolling Hills Road
Hi Yo,
Here is another comment.
From: Mary C
Sent: Tuesday, November 18, 2025 7:56 PM
To: Planning Commission <[email protected]> Subject: Public Comment - CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009: ZEINA AWAD (MAHMOUD H.
AWAD TRUSTEE FOR THE MAHMOUD AND NAWAL AWAD TRUST) - Rolling Hills Road
To the City Planning Commission,
In reference to the property on Hawthorne near Rolling Hills Road - CUP21-00018, DVP21-00001, PRE21- 00009, DIV21-00009
I am writing to clarify that, based on the project documents available to the public, the Housing Accountability Act (HAA) does not strictly apply to this proposal in the way it has been represented by the developer.
To be very direct: HAA protections only apply when a project fully complies with all objective development standards.
This project does not meet that threshold because it relies on discretionary approvals, most notably CUP21-00018, which seeks to allow shared parking between residential units and commercial space.
Shared parking approval is not automatic or objective—it requires Planning Commission interpretation and approval. That alone removes this project from automatic HAA protection.
Additionally:
- The HAA explicitly allows the City to impose conditions when safety is at risk.
Under Gov. Code §65589.5(j)(1)(A), a project may be modified or denied if there is a: “significant, quantifiable, direct, and unavoidable adverse impact on public health or safety.” This exact condition exists here unless corrected. Based on the submitted plans:
• The driveway is located on a high-speed, downhill curve on Hawthorne where real-world visibility is obstructed, especially when common SUVs or trucks are present. 253 318
2 • The proposal offers only 5 parking stalls for both guest and commercial use, which is unworkable and unsafe for senior housing in a car-dependent location.
• There is a high likelihood of parking overflow into residential streets or unsafe roadside maneuvers on Hawthorne.
These are not general objections—they represent a clearly identifiable safety hazard for senior residents, caregivers, emergency services, and the public.
The HAA does not override CEQA, nor does it require approval without mitigation.
If the CEQA exemption is questionable (which it is, for reasons previously stated) or if safety-related mitigation is necessary, the HAA does not prohibit the City from requiring changes to ensure resident and public safety.
The law protects reasonable housing development—it does not override common-sense safety planning.
TLDR;
- HAA does not apply as claimed, because this project depends on discretionary approvals, not objective standards.
- The City retains the authority—and responsibility—to require conditions or modifications. - Approval without addressing the safety and parking issues would be inconsistent with both CEQA and the HAA itself, because it would knowingly allow a preventable safety risk.
Thank you for your time
Mary Chung
254 319
1 Gomez, Yolanda
From: Garcia, Robert
Sent: Wednesday, November 19, 2025 7:51 AM
To: Gomez, Yolanda
Subject: Fw: Item 8A - November 19 Planning Commission Meeting Attachments: 2025-1118 Letter to planning commission.docx Hi Yo,
This comment was received after the cutoff time on the agenda.
From: Mike Griffiths
Sent: Tuesday, November 18, 2025 6:38 PM
To: Planning Commission <[email protected]> Subject: Item 8A - November 19 Planning Commission Meeting Hello -
Please share my attached letter with all planning Commissioners, and include in the public record for this item.
Thank you,
Mike
Mike Griffiths
255 320
November 18, 2025
Torrance Planning Commissioners:
Re: Item 8A on 11/19/2025 Agenda – Residential Development on Hawthorne Blvd just north of Rolling Hills Road
Commissioners:
As a Walteria resident, and former Torrance City Councilmember and former Torrance Planning Commissioner, I am urging you to give serious consideration to a NO vote on the proposed project. While I am not directly affected by this project, it is in my neighborhood and I am very knowledgeable about this location.
I understand that there are mandates by the State dictating the building of more residential housing, and from everything that I have seen in the past few years, every residential project that has come before the Planning Commission and/or the City Council has been approved, representing well over a thousand units, with that much more in the planning stages. This project represents a mere 20 units, so it does not make or break our City’s goals for building housing.
With that said, I want to make a general statement of opinion first, and that is that there are some pieces of land that just should never be built on. This remnant of a lot on a steep hillside is a perfect example of a lot that should never be built on. And I could go so far as to say, using state housing laws to force a project that would never likely be approved is in my opinion not for the benefit of the greater good, but for the financial benefit of a few, notably, the land owner and developer.
Opinions aside, I would like to share what I believe are factual statements about this proposal that should be considered reasons for denial of this project:
1. This section of northbound Hawthorne Blvd adjacent to the property is a steep downhill, AND on a curve, where speeding is rampant, and accidents are common. Adding a driveway for ingress and egress at this spot is creating a serious safety concern.
256 321
2. The driveway has no turnout area proposed for vehicles to allow the safe entry or exit to/from the property. Forcing a quick turn into or out of the property.
3. There is little room for vehicles to safely maneuver into the property before entering a parking area covered by a low-height header, eliminating the possibility of larger trucks such as most delivery vehicles or other commercial trucks such as moving trucks to safely enter, or even worse, to then have to back out onto the curve of northbound Hawthorne Blvd if needed.
4. For good reason, there is NO parking allowed on Hawthorne Blvd near this property, and no side streets where large vehicles or guests could park. The number of parking spaces is the bare minimum which is shared with the commercial space proposed as part of this mixed use project. It is unreasonable to expect a project that could permanently house 40 people, and to also accommodate guests and commercial property visitors to have enough space to park in only 20 spaces, with no street parking available for guests or overflow.
5. Also for good reason, there are no sidewalks along this section of Hawthorne Blvd, so people forced to park away from the location, would endanger themselves walking to this property.
6. In case of emergency at the property, getting emergency equipment into the property will be challenging as there is no access to the property from any side except from northbound Hawthorne Blvd. There is no access from the North/East sides which face the neighborhood below, and should a fire erupt, the neighborhood below would have no protection. (Also NOTE: The map on page 42 of the Agenda Item – The Location and Zoning Map which is Attachment 2, has a significant ERROR. Madison Street is completely BLOCKED by a parklet that was built many years ago at the intersection of ELEDA and CANDLEWOOD. This error doesn’t properly reflect the added difficulty any emergency vehicles would encounter trying to get to the EAST side of the proposed project. Google maps does properly show this parklet.)
7. If the parking area is full, a vehicle entering the parking area will not be able to easily turn around to exit the parking area.
257 322
8. The neighborhood below the property to the North and East WILL lose privacy from the windows proposed.
9. The neighborhood below the property to the North and East WILL lose views of the natural hillside.
10. The neighborhood below the property to the North and East WILL be lose afternoon sunshine due to the height of the project looming over the street below
11. The neighborhood below the property to the North and East WILL face increased noise and light pollution from the project.
12. The houses in neighborhood below the property to the North and East WILL lose value if this project is built.
There are many more reasons why this project will create problems for the neighborhood, and others have shared those concerns with you. The reasons listed above should be enough reason to deny this project. For many of the reasons listed, failure to heed these concerns could create potential liability to the City for approving an unsafe project.
I would also go so far as to say that just because this is a housing project, potentially protected by State mandates, it should still be OK for the City to deny projects that they believe are not in the greater good of the area surrounding the project, resulting in safety concerns and as much detriment as potential benefit, and the City should stand up to defend our community in court, if need be.
I realize that denial of this project would likely result in an appeal to City Council, and that would be OK.
Thank you for listening to my concerns about this project. And thank you for your service to our community.
Sincerely,
Mike Griffiths
258 323
1 Gomez, Yolanda
From: Mike Rosa <[email protected]>
Sent: Thursday, November 20, 2025 11:18 AM
To: Gomez, Yolanda
Subject: Lot Adjacent to Rolling Hills Bus Ctr
HI Yolanda, thank you for all your and the staƯ’s eƯorts on behalf of Torrance. We appreciated the opportunity to be heard on this project. To that end, can you provide guidance as to how we obtain all of the applicant’s reports that have been submitted in connection with this project (traƯic study plus any others)? If you could also let us know how to obtain/access the current set of plans, we would appreciate it.
Thanks again.
Michael Rosa
West Coast Capital Partners
25500 Hawthorne Blvd. Suite 2250
Torrance, CA 90505
O: 310-698-5318
[email protected]
259 324
1 Gomez, Yolanda
From: Mike Rosa
Sent: Tuesday, December 9, 2025 3:46 PM
To: Planning Commission
Cc: Gomez, Yolanda; Scott Douglas
Subject: Walteria Terrance Garden Project
Attachments: WCCP-Torrance Planning Commission - 2025-12-09.pdf Please see the attached letter in regard to the proposed project.
Regards,
Michael Rosa
West Coast Capital Partners
25500 Hawthorne Blvd. Suite 2250
Torrance, CA 90505
O: 310-698-5318
[email protected]
260 325
25500 HAWTHORNE BOULEVARD, SUITE 2250
TORRANCE, CALIFORNIA 90505
T: 310-698-5310
December 9, 2025
City of Torrance Planning Commission
c/o Community Development Department
3031 Torrance Blvd.
Torrance, CA 90503
Via Email: [email protected]
RE: Public Comment
CUP21-00018, DVP21-00001, PRE21-00009, DIV21-00009
East Side of Hawthorne Blvd, Approximately 200 Ft. North of Rolling Hills Rd.
Dear Members of the Planning Commission:
I am writing to respectfully request denial of the proposed project in its current form due to significant unresolved geotechnical and construction-safety risks that directly affect the adjacent commercial property to the south. These risks are clearly documented within the applicant’s own geotechnical report and project section drawings, and they have not been adequately addressed in the development submittal. Below is a summary of the most critical deficiencies, all sourced from the project’s own documentation.
1. Temporary Excavation Hazards Are Not Properly Addressed or Mitigated a) Excavation depth exceeds what the soils report identifies as safe. The soils report states in Section 13.15 – Temporary Excavations, that:
• Excavations more than 16 feet are not anticipated.
• The same section includes a chart indicating that any cut greater than 20 feet requires special engineering review and reevaluation.
However, the developer’s Building Section A drawing shows the parking level floor elevation at 207.5 feet, which does not include:
• slab thickness
• footings / grade beams
• required remedial excavation depth per Section 13.1 – Remedial Grading Recommendations
Using the site’s highest adjacent grade and the report’s own remedial grading requirements, the actual excavation height is 23 feet (see attached Exhibit A – applicant’s survey), well above both the 16-foot assumption and the 20-foot reevaluation threshold. This requires a completely new engineering analysis—none has been provided. 261 326
December 9, 2025