8H
Date: June 9, 2026
To: Honorable Mayor and Members of the City Council
From: Michelle Ramirez, Community Development Director
By: Brice Kennedy, Acting Planning Associate | [email protected] Subject: Community Development – Award Consulting Services Agreement to Provide Professional Design Services for the Preliminary Design and Environmental Analysis of Multi-Use Active Transportation Trail Project and Appropriate Funds.
Expenditure: Not-to-Exceed $700,000 (General Fund and Non-General Fund).
RECOMMENDATION
Recommendation of the Community Development Director that City Council:
1. Award a consulting services agreement with RRM Design Group of San Juan Capistrano, CA (RFP No. B2025-24), for an amount not-to-exceed $700,000, to provide professional design and environmental analysis services for the Multi-Use Active Transit Trail Project (I-194), for the period beginning June 9, 2026 and ending June 30, 2027; and
2. Appropriate $50,000 from the Capital Improvement Fund to Transportation Open Space Corridor Multi-Use Trail project (I 194-RW0001).
FUNDING
Funding is available from the following sources:
Funding Source Amount
Measure M Grant (MM4601.07) - Transportation Open Space Corridor Multi-Use Trail project (I 194-RW0001) - Non-General Fund (Previously Appropriated) $650,000
Capital Improvement Fund - Transportation Open Space Corridor Multi-Use Trail project (I 194-RW0001) - General Fund (Pending Appropriation) $50,000
Total $700,000
DISCUSSION
Background
The City of Torrance has undertaken several efforts to improve pedestrian access in Downtown Torrance, including the Downtown Torrance Active Transportation Improvement Project (2019) and the Downtown Torrance Revitalization and Connectivity Plan (2021). In 2022, the City completed an open space corridor analysis identifying opportunities for off-street trails throughout the City. These efforts identified a gap in bicycle and pedestrian connectivity between the Regional Transit Center (RTC) and Downtown Torrance. The proposed off-street trail would help 1 City Council
June 9, 2026
close this gap by providing a safe, accessible corridor for walking, biking, and rolling, while supporting reduced vehicle miles traveled (VMT) and greenhouse gas (GHG) emissions and improving access to key destinations, services, and employment.
In early 2022, the City applied for a Los Angeles County Metropolitan Transportation Authority (LACMTA, LA Metro) Measure M Multi-Year Subregional Programs (MYSP) grant with the assistance of the South Bay Cities Council Of Governments (SBCCOG). In September 2022, the LACMTA programmed $650,000 in Measure M MYSP Funds to complete the Development, Project Approval/Environmental Document (PAED), and Plans, Specifications, and Estimates (PS&E) for approximately 5,000 linear feet of trail within one of the identified corridors between the Mary K. Giordano Regional Transit Center (RTC) and Downtown Torrance. On February 6, 2024, City Council accepted and appropriated the Measure M grant award funds to the Transportation Open Space Corridor Multi-Use Trails Project (I-194) and in September 2025, the Community Development Department issued a revised Request for Proposals (RFP) for consultant services to support the Preliminary Design and Environmental Analysis of the Multi- Use Active Transportation Trail Project after previously rejecting unqualified proposals. For the latest RFP, the City received proposals from five well-qualified firms: Dokken Engineering, John M. Cruikshank Consultants (JMC), Inc., PlaceWorks, RRM Design Group, and The SWA Group.
Evaluations
After evaluating the submitted proposals and conducting interviews with the highest-ranked firms, proposals were assessed based on the following criteria: (1) demonstrated understanding of the project and scope of work, including completeness and responsiveness to the RFP requirements; (2) qualifications of the proposed project team, including relevant experience, technical capabilities, and demonstrated success on similar projects; (3) proposed project schedule and the ability to complete the work within the required timeframe; and (4) quality of references, including verification of performance on recent, comparable projects.
In accordance with Federal and State Qualifications-Based Selection (QBS) requirements, the selection process was based solely on qualifications and qualitative proposal materials; cost was not considered during the evaluation process.
Based on this evaluation, RRM Design Group was determined to be the most qualified firm.
RRM’s selection is further supported by its established reputation and positive working relationship with the City, as well as its extensive experience successfully delivering similar projects throughout California, including numerous grant-funded efforts. Their demonstrated expertise, familiarity with local and state requirements, and proven track record of high-quality project delivery make them well-suited to support the City on this project.
Results
Ranking Vendor City State Evaluation Score
1 RRM Design Group San Luis Obispo CA 97.0
2 Dokken Engineering Folsom CA 95.0
3 PlaceWorks Santa Ana CA 88.8
4 JMC San Pedro CA 78.6
5 The SWA Group Los Angeles CA 72.6
2 City Council
June 9, 2026
RFP Evaluation Criteria Possible
Points
Dokken
Eng. JMC Place-
Works
RRM
Design
Group
The
SWA
Group
Understanding of the project and
scope of work; and completeness
of the RFP
40 37.2 30.6 32.6 38.6 26
Qualifications of proposed project
team 30 28.2 23 26.6 28.4 23.8
Project Schedule 25 25 20.6 24.6 25 19
References 5 4.6 4.4 5 5 3.8
Average Total Score 100 95 78.6 88.8 97 72.6
Staff has been working with the two shortlisted top-qualified firms to refine the project scope and budget following receipt of proposals that exceeded the original $650,000 grant award. Both firms submitted revised cost proposals and reduced their overall project budgets; however, the proposals remain above the available grant funding amount. In discussions with both finalists regarding total project costs, both explained that overall costs have increased from the original grant award date in 2022. To maintain the project schedule and proceed with consultant selection and design services, staff is recommending an increase to the total project budget by $50,000, from $650,000 to a new not-to-exceed total amount of $700,000.
ATTACHMENT
1. Consulting Services Agreement
3 CONSULTING SERVICES AGREEMENT
This CONSULTING SERVICES AGREEMENT (“Agreement”) ismade and entered into as of June 9, 2026 (the “EffectiveDate"),by and between the CITY OF TORRANCE, a municipal corporation(“CITY”),and RRM Design Group, a CaliforniaCorporation (“CONSULTANT”).
RECITALS:
A. CITY wishes to retainthe services of an experienced and qualified CONSULTANT to provide professionaldesign servicesforthe Preliminary Design and Environmental Analysis of Multi-Use Active Transportation Trail Project.
In order to obtain the desired services, CITY has circulated itsRequest for Proposal forthe Design and Environmental Analysis of Multi-Use Active Transportation TrailProject,RFP No. B2025-24 (the“RFP”).
B.
C. CONSULTANT has submitted a Proposal (the “Proposal”)in response to the RFP. In itsProposal CONSULTANT represents thatitisqualifiedto perform those services requested inthe RFP. Based upon itsreview of allproposals submitted inresponse to the RFP, CITY iswillingto award thisAgreement to CONSULTANT.
AGREEMENT:
SERVICES TO BE PERFORMED BY CONSULTANT1.
CONSULTANT willprovide the services and installthose materials listed in CONSULTANT’S Proposal submitted in response to the RFP. A copy of the RFP isattached as ExhibitA. A copy of the Proposal isattached as Exhibit B.
CONSULTANT warrants that all work and services set forthinthe Proposal will be performed in a competent, professionaland satisfactorymanner.
2. TERM
Unless earlierterminated in accordance with Paragraph 4 below, thisAgreement will continue in full force and effect from the Effective Date through June 30, 2027.
3. COMPENSATION
CONSULTANT’S Fee.A.
For services rendered pursuant to thisAgreement, CONSULTANT will be paid in accordance with the Compensation Schedule set forth in the Proposal; provided, however, that in no event willthe total amount of money paid CONSULTANT, forservices initiallycontemplated by this Agreement, exceed the sum of $700,000 (“Agreement Sum”), unless otherwise firstapproved inwritingby CITY.
1 4
ATTACHMENT 1
B. Schedule of Payment.
Provided that CONSULTANT is not in default under the terms of this Agreement, upon presentation of an invoice,CONSULTANT willbe paid the fees described inParagraph 3.A.above, according to the Compensation Schedule. Payment willbe due within30 days afterthe date of the invoice.
4. TERMINATION OF AGREEMENT
A. Termination by CITY forConvenience.
1. CITY may, at any time,terminate the Agreement forCITY’S convenience and without cause.
Upon receiptof writtennoticefrom CITY of such terminationfor CITY’S convenience, CONSULTANT will;
2. cease operations as directed by CITY inthe notice;
take actions necessary, or thatCITY may direct,forthe
protectionand preservation of the work; and
except forwork directedto be performed priorto the
effectivedate of termination stated in the notice, terminate all existingsubcontracts and purchase orders and enter into no furthersubcontracts and purchase orders.
a.
b.
c.
In case of termination for CITY’S convenience, CONSULTANT will be entitledto receive payment forwork executed, together with costs incurred by reason of the termination,along with reasonable overhead and profiton work not executed.
3. Termination for Cause.B.
1. Ifeitherpartyfailsto perform any term, covenant or condition in this Agreement and thatfailurecontinues for 15 calendar days afterthe nondefaulting party gives the defaulting party written notice of the failureto perform, thisAgreement may be terminated for cause; provided, however, that ifduring the notice period the defaulting party has promptly commenced and continues diligentefforts to remedy the default,the defaultingpartywillhave such additional time as isreasonably necessary to remedy the default.
2. In the event thisAgreement isterminated forcause by the default of CONSULTANT, CITY may, at the expense of CONSULTANT
and itssurety,complete thisAgreement or cause itto be
2 5
completed. Any check or bond delivered to the CITY in connection with thisAgreement, and the money payable thereon,will be forfeitedto and remain the propertyof the CITY. Allmoneys due CONSULTANT under the terms of thisAgreement willbe retained by CITY, but the retentionwillnot release CONSULTANT and its surety from liabilityforthe default. Under these circumstances, however, CONSULTANT and itssuretywillbe creditedwith the amount of money retained,toward any amount by which the cost of completion exceeds the Agreement Sum and any amount
authorized for extra services.
3. Termination for cause will not affect or terminate any of the rightsof CITY as againstCONSULTANT or itssuretythen existing,or that may thereafteraccrue because of the default;thisprovision isin additionto allother rightsand remedies availableto the CITY under law.
C. Termination for Breach of Law.
In the event CONSULTANT or any of itsofficers,directors,shareholders, employees, agents, subsidiariesor affiliatesisconvicted (i)of a criminal offense as an incidentto obtainingor attempting to obtain a publicor privatecontract or subcontract, or inthe performance of a contract or subcontract; (ii)under state or federalstatutesof embezzlement, theft, forgery,bribery,falsificationor destructionof records, receiving stolen property,or any other offense indicatinga lack of business integrityor business honesty that currently,seriously,and directlyaffects responsibilityas a publicconsultantor CONSULTANT; (iii)under state or federalantitruststatutesarisingout of the submission of bids or proposals; or (iv)of violationof Paragraph 19 of thisAgreement; or forany other cause CITY determines to be so serious and compelling as to affect CONSULTANT’S responsibilityas a publicconsultant or CONSULTANT, includingbut not limitedto,debarment by another governmental agency, then CITY reserves the unilateralrightto terminate thisAgreement or to impose such other sanctions (which may include financialsanctions, temporary suspensions or any other condition deemed appropriate short of termination)as itdeems proper. CITY willnot take action until CONSULTANT has been given noticeand an opportunityto present evidence in mitigation.
5. FORCE MAJEURE
Ifany partyfailsto perform itsobligationsbecause of strikes,lockouts, labor disputes,embargoes, acts of God, inabilityto obtain labor or materials or reasonable substitutesfor labor or materials,governmental restrictions, governmental regulations,governmental control,judicialorders, enemy or hostile governmental action,civilcommotion, fireor other casualty,or other causes beyond the reasonable controlof the partyobligatedto perform, then that party’s 3 6
performance willbe excused fora periodequal to the period of that cause for failureto perform.
6. RETENTION OF FUNDS
CONSULTANT authorizes CITY to deduct from any amount payable to CONSULTANT (whether or not arisingout of thisAgreement) any amounts the payment of which may be indispute or that are necessary to compensate CITY forany losses,costs,liabilities,or damages sufferedby CITY, and allamounts forwhich CITY may be liableto thirdparties,by reason of CONSULTANT’S acts or omissions in performing or failingto perform CONSULTANT’S obligations under thisAgreement. In the event that any claim ismade by a thirdparty,the amount or validityof which isdisputed by CONSULTANT, or any indebtedness existsthat appears to be the basis fora claim of lien,CITY may withhold from any payment due, without liabilityforinterestbecause of the withholding,an amount sufficient to cover the claim. The failure of CITY to exercise the rightto deduct or to withhold willnot, however, affect the obligationsof CONSULTANT to insure,indemnify, and protectCITY as elsewhere provided inthisAgreement.
7. CITY REPRESENTATIVE
Oscar Martinez,Planning Manager - Community Development Department is designated as the “CityRepresentative,”authorized to act in its behalf with respect to the work and services specifiedinthisAgreement and to make all decisions inconnection with thisAgreement. Whenever approval, directions,or other actions are required by CITY under thisAgreement, those actions will be taken by the City Representative,unless otherwise stated. The City Manager has the rightto designate another City Representative at any time, by providing notice to CONSULTANT.
8. CONSULTANT REPRESENTATIVE(S)
The followingprincipal(s)of CONSULTANT are designated as being the principal(s)and representative(s)of CONSULTANT authorized to act in its behalf with respect to the work specifiedinthisAgreement and make all decisions in connection with thisAgreement:
Brian Hannegan
ProjectManager, RRM Design Group
3765 S. Higuera St.Ste, 102
San Luis Obispo, CA 93041
(949) 325-0629
[email protected]
Mike Sherrod
Managing Principal,RRM Design Group
3765 S. Higuera St.Ste, 102
San Luis Obispo, CA 93041
(949) 347-5587
[email protected]
4 7
9. INDEPENDENT CONTRACTOR
CONSULTANT is,and at alltimes willremain as to CITY, a wholly independent contractor.NeitherCITY nor any of itsagents willhave control over the conduct of CONSULTANT or any of CONSULTANT’S employees, except as otherwise set forthinthisAgreement. CONSULTANT’S agents and employees are not and shallnot be considered employees of CITY forany purpose. CONSULTANT may not,at any time or in any manner, represent that itor any of itsagents or employees are inany manner agents or employees of CITY. CITY has no duty, obligation,or responsibilityto CONSULTANT’S agents or employees under the Affordable Care Act. CONSULTANT issolelyresponsibleforany tax penalties associated withthe failureto offeraffordablecoverage to itsagents and employees under the AffordableCare Act and any other liabilities,claims and obligationsregarding compliance with the Affordable Care Act with respect to CONSULTANT’S agents and employees. CITY isnot responsible and shall not be held liableforCONSULTANT’S failureto comply with CONSULTANT’S duties, obligations,and responsibilitiesunder the Affordable Care Act. CONSULTANT agrees to defend, indemnify and hold CITY harmless forany and alltaxes and penaltiesthatmay be assessed against CITY as a resultof CONSULTANT’S obligationsunder the AffordableCare Act relatingto CONSULTANT’S agents and employees.
10. BUSINESS LICENSE
CONSULTANT must obtain a City business license priorto the start of work under thisAgreement, unless CONSULTANT isqualifiedforan exemption.
11. OTHER LICENSES AND PERMITS
CONSULTANT warrants thatithas allprofessional,contractingand other permits and licenses required to undertake the work contemplated by thisAgreement.
12. FAMILIARITY WITH WORK
By executing thisAgreement, CONSULTANT warrants thatCONSULTANT (a) has thoroughly investigatedand considered the scope of services to be performed, (b)has carefullyconsidered how the services should be performed, and (c)fullyunderstands the facilities,difficultiesand restrictionsattending performance of the services required under thisAgreement. Ifthe services involvework upon any site,CONSULTANT warrants thatCONSULTANT has or willinvestigatethe siteand isor willbe fullyacquainted with the conditions there existing,priorto commencement of the services set forthinthisAgreement.
Should CONSULTANT discover any latentor unknown conditions that will materiallyaffectthe performance of the services set forthinthisAgreement, CONSULTANT must immediately inform CITY of thatfactand may not proceed except at CONSULTANT’S riskuntilwritteninstructionsare received from CITY.
13. CARE OF WORK
CONSULTANT must adopt reasonable methods during the term of the Agreement to furnishcontinuous protectionto the work, and the equipment, materials,papers, documents, plans, studies and other components to prevent losses or damages, and willbe responsibleforalldamages to persons or 5 8
property,untilacceptance of the work by CITY, except those losses or damages as may be caused by CITY’S own negligence.
CONSULTANT’S ACCOUNTING RECORDS: OTHER PROJECT RECORDS
Records of CONSULTANT’S time pertainingto the project,and records of accounts between CITY and CONSULTANT, willbe kept on a generally recognized accounting basis. CONSULTANT willalso maintain all other records includingwithout limitation,specifications,drawings, progress reportsand the like,relatingto the work and services identifiedin Exhibit A. All records will be availableto CITY during normal working hours. CONSULTANT will maintain these records forthree years afterfinalpayment.
14. 15. INDEMNIFICATION
To the fullestextent permitted by law, CONSULTANT shallindemnify,defend and hold harmless Agency and any and allof itsofficials,officers,employees, agents,successors,and volunteers("IndemnifiedParties")from and against any and allclaims,actions,lawsuits,arbitrationproceedings, losses, liabilities, damages, costs and expenses, includingattorney'sfees and costs, to the extent they ariseout of,pertainto,or relateto the negligence, recklessness, or willful misconduct of the CONSULTANT. CONSULTANT'S duty to defend any claim, action,lawsuit,or arbitrationproceeding (collectively,“Claim") shallconsist of reimbursement of defense costs incurred by Agency indirectproportion to the CONSULTANT'S proportionatepercentage of faultconcerning such Claim.
Notwithstanding the previous sentence: inthe event one or more defendants is unable to pay itsshare of defense costs due to bankruptcy or dissolution of the business then the design professionalshallmeet and confer with other parties regardingunpaid defense costs and shallbe liableforany such defense costs allowable by law.
NON-LIABILITY OF CITY OFFICERS AND EMPLOYEES
No officeror employee of CITY willbe personallyliableto CONSULTANT, in the event of any defaultor breach by the CITY or forany amount that may become due to CONSULTANT.
16. 17. INSURANCE
CONSULTANT and itssubCONSULTANTs must maintain for the duration of the Agreement at theirsole expense the followinginsurance, which will be fullcoverage, not subjectto self-insuranceprovisions:
A.
Automobile Liability,includingowned, non-owned and hired vehicles,with at leastthe followinglimitsof liability:
1. Primary BodilyInjurywith limitsof at least$500,000 per person, $1,000,000 per occurrence; and
a.
Primary Property Damage of at least$250,000 per
occurrence; or
b.
6 9
Combined singlelimitsof $1,000,000 per occurrence.c.
2. Commercial General Liabilityincludingcoverage forpremises products and completed operations,independent
CONSULTANTs/vendors, personal injuryand contractual
obligationswith combined singlelimitsof coverage of at least $2,000,000 per occurrence, $4,000,000 aggregate.
Workers' Compensation coverage as requiredby the Labor Code of the State of Californiaand, ifworkers' compensation isrequired, employer's liabilityinsurance with minimum limitsof ($1,000,000)per occurrence or occupational illness.The Workers' Compensation policyshallbe endorsed with a waiver of subrogation in favor of the CITY forallwork performed by the CONSULTANT, itsemployees, agents and subcontractors.
Professional Liability(Errorsand Omissions): Insurance appropriate to the CONSULTANT'S profession,with limitno less than
$2,000,000 per occurrence or claim,$4,000,000 aggregate.
The insurance provided by CONSULTANT willbe primary and non contributory.
3. 4.
B.
CITY, the Successor Agency to the Former Redevelopment Agency of the City of Torrance, the City Council and each member thereof, members of boards and commissions, every officer,agent, official,employee and volunteer must be named as additional insureds under the automobile and general liabilitypolicies.Coverage can be provided in the form of an endorsement to the CONSULTANT’S insurance or applicable policy language.
C.
CONSULTANT must provide certificatesof insurance includingall requiredamendatory endorsements (orcopies of the applicable policy language effectingcoverage requiredby thisclause) indicating appropriatecoverage, to the CityClerk of the Cityof Torrance before the commencement of work.
D.
Each insurance policyrequired by thisParagraph must contain a provision that no termination,cancellationor change of coverage can be made without notice to the CITY.
E.
Ifthe CONSULTANT maintains broader coverage and/or higher limitsthan the minimums shown above, the CITY requires and shallbe entitled to the broader coverage and/or the higher limitsmaintained by the CONSULTANT. Any availableinsurance proceeds inexcess of the specifiedminimum limitsof insurance and coverage shall be available to the CITY.
F.
7 10
G. The procuring of insurance shallnot be construed as a limitation on liabilitynor as fullperformance of the indemnificationprovisions of the CONSULTANT.
Claims Made Policies
Ifany of the required policiesprovide coverage on a claims-made basis:
a. The Retroactive Date must be shown and must be before the date of the contractor the beginning of contractwork,
b. Insurance must be maintained and evidence of insurance must be provided forat leastfive(5)years aftercompletion of the contract of work. c. Ifcoverage iscanceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effectivedate, the CONSULTANT must purchase “extended reporting" coverage fora minimum of five(5)years aftercompletion of contract work.
H.
CONSULTANT hereby grants to CITY a waiver of any rightto subrogation which any insurerof said CONSULTANT may acquire against the CITY by virtueof the payment of any loss under such insurance. CONSULTANT agrees to obtainany endorsement thatmay be necessary to affect this waiver of subrogation,but thisprovisionapplies regardless of whether or not the CITY has received a waiver of subrogation endorsement from the insurer.
I.
Self-insured retentionsmust be declared to and approved by the CITY.
The CITY may requirethe CONTRACTOR to provide proof of abilityto pay losses and relatedinvestigations,claim administration,and defense expenses withinthe retention.The policylanguage shallprovide, or be endorsed to provide,thatthe self-insuredretentionmay be satisfiedby either the named insured or CITY.
J.
18. SUFFICIENCY OF INSURERS
Insurance requiredby thisAgreement willbe satisfactoryonly ifissued by companies admittedto do business inCalifornia,rated“A” or better in the most recenteditionof Best’sKey Rating Guide, and only ifthey are of a financial category Class VII or better,unless these requirements are waived by the Risk Manager of CITY (“RiskManager”) due to unique circumstances. In the event the Risk Manager determines thatthe work or servicesto be performed under thisAgreement creates an increased or decreased riskof loss to CITY, the CONSULTANT agrees thatthe minimum limitsof any insurance policies or performance bonds requiredby thisAgreement may be changed accordingly upon receiptofwrittennoticefrom the Risk Manager; provided that CONSULTANT willhave the rightto appeal a determination of increased coverage by the Risk Manager tothe CityCouncil of CITY within 10 days of receiptof noticefrom the Risk Manager.
19. CONFLICT OF INTEREST
No officeror employee of the CITY may have any financialinterest,direct or indirect,inthisAgreement, nor may any officeror employee participate A.
8 11
in any decision relatingto the Agreement that affectsthe officer or employee’s financialinterestor the financialinterestof any corporation, partnership or association inwhich the officeror employee is,directlyor indirectlyinterested,inviolationof any law, ruleor regulation.
No person may offer,give,or agree to give any officeror employee or former officeror employee, nor may any officeror employee solicit, demand, accept, or agree to accept from another person, a gratuityor an offerof employment inconnection with any decision,approval, disapproval,recommendation, preparationor any partof a program requirement or a purchase request, influencingthe content of any specificationor procurement standard, rendering of advice, investigation, auditing,or inany other advisory capacity inany way pertainingto any program requirement, contractor subcontract, or to any solicitationor proposal.
B.
20. NOTICE
A. Allnotices,requests,demands, or other communications under this Agreement willbe inwriting.Notice willbe sufficientlygiven forall purposes as follows:
1. Personal delivery.When personally delivered to the recipient, notice iseffectiveon delivery.
First Class mail. When mailed firstclass to the last address of the recipientknown to the party giving notice,notice is effective three mail deliverydays afterdeposit ina United States Postal Service office or mailbox.
2. Certifiedmail. When mailed certifiedmail, return receipt requested notice iseffectiveon receipt,ifdeliveryisconfirmed by a return receipt.
3. Overnight delivery.When deliveredby an overnightdelivery service,charges prepaid or charged to the sender’s account, notice iseffectiveon delivery,ifdeliveryisconfirmed by the delivery service.
4. Facsimile transmission. When sent by fax to the lastfax number of the recipientknown to the party giving notice,notice is effective on receipt.Any noticegiven tDyfax willbe deemed received on the next business day ifitisreceived after5:00 p.m. (recipient’stime) or on a non-business day.
5. Addresses forpurpose of givingnoticeare as follows:6.
CONSULTANT: RRM Design Group
Brian Hannegan
9 12
3765 S. Higuera St. Ste, 102
San Luis Obispo, CA 93041
(949) 325-0629
Fax: N/A
CITY: City Clerk
City of Torrance
3031 Torrance Boulevard
Torrance, CA 90503
Fax: (310) 618-2931
B. Any correctlyaddressed noticethatisrefused,unclaimed, or undeliverable because of an act or omission of the party to be notified,will be deemed effective as of the firstdate the notice was refused, unclaimed or deemed undeliverable by the postal authorities,messenger or overnight deliveryservice.
Eitherparty may change itsaddress or fax number by giving the other party noticeof the change inany manner permitted by thisAgreement.
C.
PROHIBITION AGAINST ASSIGNMENT AND SUBCONTRACTING21.
This Agreement and allexhibitsare binding on the heirs, successors, and assigns of the parties.The Agreement may not be assigned or subcontracted by eitherCITY or CONSULTANT without the priorwrittenconsent of the other.
INTEGRATION: AMENDMENT22.
This Agreement represents the entireunderstanding of CITY and CONSULTANT as to those matters contained in it.No priororalor writtenunderstanding willbe of any force or effectwith respect to the terms of thisAgreement. The Agreement may not be modified or alteredexcept inwritingsigned by both parties.
23. INTERPRETATION
The terms of thisAgreement should be construed inaccordance with the meaning of the language used and should not be construed foror against either party by reason of the authorship of thisAgreement or by any other ruleof constructionthatmight otherwise apply.To the extent that the terms of the RFP or the Proposal are inconsistentwith the terms ofthisAgreement, the terms of thisAgreement shallcontrol.
24. SEVERABILITY
Ifany partofthisAgreement isfound to be inconflictwith applicable laws, that partwillbe inoperative,nulland void insofaras itisin conflictwith any applicable laws, but the remainder of the Agreement willremain in full force and effect.
25. TIME OF ESSENCE
Time isof the essence inthe performance of thisAgreement. 10 13
26. GOVERNING LAW: JURISDICTION
This Agreement willbe administered and interpretedunder the laws of the State of California.Jurisdictionof any litigationarisingfrom the Agreement willbe in Los Angeles County, California.
COMPLIANCE WITH STATUTES AND REGULATIONS
CONSULTANT willbe knowledgeable of and willcomply with allapplicable federal,state,county and citystatutes,rules,regulations,ordinances and orders.
27. 28. WAIVER OF BREACH
No delay or omission inthe exercise of any rightor remedy by a nondefaulting party on any defaultwillimpair the rightor remedy or be construed as a waiver.
A party’sconsent or approval of any act by the other party requiringthe first party’sconsent or approval willnot be deemed to waive or render unnecessary the other party’sconsent to or approval of any subsequent act. Any waiver by eitherpartyof any defaultmust be inwritingand willnot be a waiver of any other defaultconcerning the same or any other provisionof thisAgreement.
29. ATTORNEY’S FEES
Except as provided forin Paragraph 15, inany dispute,litigation,arbitration,or other proceeding by which one partyeitherseeks to enforce itsrightsunder this Agreement (whether incontract,tortor both) or seeks a declarationof any rights or obligationsunder thisAgreement, the prevailingparty willbe awarded reasonable attorney’sfees, together with any costs and expenses, to resolve the dispute and to enforce any judgment.
30. EXHIBITS
AllexhibitsidentifiedinthisAgreement are incorporated intothe Agreement by this reference.
CONSULTANT’S AUTHORITY TO EXECUTE31.
The persons executing thisAgreement on behalfof CONSULTANT warrant that (i)CONSULTANT isduly organized and existing;(ii)they are duly authorized to execute thisAgreement on behalf of CONSULTANT; (iii)by so executing this Agreement, CONSULTANT isformallybound to the provisionsof this Agreement; and (iv)the enteringintothisAgreement does not violateany provisionof any other Agreement to which CONSULTANT is bound.
32. PUBLIC RECORDS ACT
Any documents submitted by the CONSULTANT allinformationobtained in connection with the CITY’S rightto auditand inspectthe CONSULTANT’S documents, books, and accounting records pursuant to paragraph 14 CONSULTANT’S Accounting Records; Other ProjectRecords; as well as those documents which were required to be submitted in response to the Request for Proposals (RFP) used inthe solicitationprocess forthis Contract, become the exclusive propertyof the City. Allsuch documents become a matter of public record and shallbe regarded as publicrecords. Exceptions will be those elements in the California Government Code Section 7920.000 et seq. (Public 11 14
Records Act) and which are marked “trade secret”,“confidential”,or “proprietary”.
The CITY shallnot inany way be liableor responsibleforthe disclosureof any such records including,without limitation,those so marked, ifdisclosure is required by law, or by an order issued by a court of competent jurisdiction.
In the event the CITY isrequired to defend an action on a Public Records Act request forany of the aforementioned documents, information,books, records, and/or contents of a proposal marked “tradesecret”,“confidential”,or “proprietary”,the CONSULTANT agrees to defend and indemnify the CITY from allcosts and expenses, includingreasonable attorney’sfees,inactionor liability arisingunder the Public Records Act.
CITY OF TORRANCE,
a municipal corporation
RRM Design Group,
a Californiacorporation
By:
George K. Chen, Mayor Brian Hannegan,
ProjectManager or Managing Partner
ATTEST:
Rebecca Poirier,MMC
City Clerk
APPROVED AS TO FORM:
PATRICK Q. SULLIVAN
CityAttorney
By:
Request forProposals
Proposal
Exhibit A
Exhibit B
Attachments:
Rev. 0424
12 15
EXHIBIT A
REQUEST FOR PROPOSALS
[To be attached]
16 EXHIBIT A
REQUEST FOR PROPOSALS
[To be attached]
17 Request for Proposals (RFP)
Cityof Torrance |3031 Torrance Blvd,Torrance CA 90503 |www.TorranceCA.Gov ‘«Di
RFP for Preliminary Design and Environmental Analysis of Multi-Use Active Transportation TrailProject
RFP No. B2025-24
RFP Submittal Information
No mail or hand deliveredProposals. No faxed proposals.
No Late proposals.
Location: City of Torrance
Purchasing Division
3031 Torrance Blvd.
Torrance, CA 90503
Date: Thursday, December 4, 2025
Time Deadline: 5:00 p.m. Local (Pacific)Time
Submittal Requirements
Your submittalmust includethe following:
• Vendor’s Response (Section IIIof thisdocument) on the forms provided. Ifadditionalspace is required,please attachadditionalpages.
• Proposer’s Affidavit(Attachment 1)
Proposers willbe disqualifiediftheirproposal does not include the above items.
Prior to the award of a Contract
The successful vendor, must submit the followingto the City of Torrance • Proof of insurance and applicable bonds, as indicatedin the terms and conditions of this RFP document.
• Proof of a Cityof Torrance Business License, please contact the Cityof Torrance Business License Office at (310) 618-5923.
1 18
RFP for Preliminary Design and Environmental Analysis of Multi-Use Active Transportation TrailProject
RFP No. B2025-24
SECTION I RFP INSTRUCTIONS AND INFORMATION
Notice ishereby given thatsealed proposals willbe received online until5:00 p.m. December 4, 2025.
The City of Torrance;
The CityofTorrance ison the western side of Los Angeles County. Itisboarded by the Palos Verdes Peninsula on the south, the Cityof Gardena on the north,the Cityof Redondo Beach on the northand west boundaries,the Cityof Lomita on the east and the PacificOcean on the west. The City encompasses an area of approximately 21 square miles,329 miles of Streets, 1870 intersections,550 miles of sidewalks, 47,000 Street Trees, 6 Public Libraries,a Municipal Airport,TransitSystem, 46 Parks & Recreation Amenities, 6 Fire Stations, 1 Police Stationand 1 PoliceCommunity Center, and has an estimated populationof approximately 146,115, which makes Torrance one of the top 10 cities in Los Angeles County inregards to population.
Background:
The CityofTorrance isseeking proposalsforthe PreliminaryDesign and Environmental Analysis of a multi-modal activetransportationtrailbetween the Mary K. Giordano Regional TransitCenter (RTC) and Downtown Torrance, approximately 5,000 linearfeetof trail.
The Downtown “Old Torrance” area has been the core of the Torrance Tract,since the city’sfounding in 1912. Downtown was the commercial hub of the “Balanced City”envisioned by Cityfounder Jared Sydney Torrance and remains one ofthe oldestand more densely populated areas inthe City.Many visitorsto and residentsof Downtown Torrance enjoy itswalkabilityand improved active transportationinfrastructure.The Cityof Torrance has undertaken key effortsto improve pedestrian access withinDowntown Torrance inrecent years, implementing the Downtown Torrance Active TransportationImprovement Project(2019) and preparingthe Downtown Torrance Revitalization and ConnectivityPlan (2021).
In 2022, the Citycompleted an open space corridoranalysisthat identifiedlocationsforthe design and development of off-roadtrailsthattransverse the City.The corridoranalysisissupported by the 2021 Downtown Revitalizationand ConnectivityPlan,which identifieda gap in bicycleand pedestrian connectivitybetween the RTC and Downtown Torrance. The design of thisoff-streettrailwillprovide a space forhealthyoutdoor recreationand non-motorized options of travelto reduce vehicle miles traveled(VMT) and greenhouse gas (GHG) emissions, as well as improve activetransportation options likewalking,biking,and rollingforthe publicto reach destinations,services,and employment.
Additionalresources can be accessed at the followingembedded links:
The Downtown Torrance Active Transportation Improvement Project The Downtown Torrance Revitalization and Connectivity Plan The Torrance General Plan
Access to the Torrance Municipal Code
More information regarding the Mary K. Giordano Regional Transit Center 2 19
Definitions;
Definitionas applied to this RFPWord
City The City of Torrance, California
Vendor, Contractor,
Proposer, Firm or
Consultant
The person, firm,company or corporationprovidingservices to the City,or submittinga proposal inresponse to thisRFP
Contract, Purchase
Order, Agreement,
Purchasing Agreement
The agreement between the awarded Vendor and the Cityas a result of thisRequest for Proposals
Proposal Submittal Form:
Prospective bidders must submit bids inelectronic only format at https://pbsvstem.planetbids.com/portal/47426/portal-home; The proposal must be made on the form provided and uploaded on PlanetBids.
Scan and attachthe followingrequired documents to your eBid.This listmay not be all-inclusive; additionalitems may be requiredelsewhere inbid specifications. Failuretoprovide required documents withbid may cause the bid to be deemed non-responsive .) Ifan individualmakes the proposal, itmust be signed by that individual,with an address and telephone number. Ifmade by a business entity,itmust be signed by an authorized person that executes binding agreements and contracts.A fullbusiness address and telephone are required.
Blank spaces inthe proposal form must be completed using ink,indeliblepencil,typewriteror digitally.
The textof the proposal form must not be changed and no additions.Any unauthorized conditions, limitations,or provisos attached to a proposal willrender itinformaland may cause itsrejection.
Alterationsby erasure or interlineationsmust be explained or noted inthe proposal form over the signature of the Proposer.
Questions:
Allquestions regarding thisRFP must be submitted onlineno laterthan 12:00 PM Thursday, November 6, 2025. Answers to questions willbe posted online for all interested bidders to review.
Bidders who have downloaded bid documents by the time that the questions are responded to will receive an automated email notifyingthem of additionalinformation and/or addendums that have been posted to the website. No questions via telephone. No questions submitted afterdeadline. Written answers and any other changes to the RFP willbe sent via Planetbidsto allknown prospective proposers as an addendum to the RFP.
Errors and Omissions:
The proposer may not take advantage of any errorsand/or omissions inthese specificationsor inthe proposer’s specificationssubmitted with itsproposal. Ifthereare errorsor omissions,you willbe notified.
Proposers Examination of Requirements:
The Proposer isrequired to examine carefullythe site,the instructions,informationand specifications of thisdocument, investigatethe conditions,the character,qualityand quantityof work to be performed as required by thisdocument. Submission of a proposal willbe considered prima facie evidence thatthe Proposer has made such examination.
3 20
Reservation:
The Cityreserves the rightto reviseor amend these specificationspriorto the date set foropening proposals. Revisions and amendments willbe identifiedby an addendum to thisRFP. Ifthe revisions requireadditionaltime to enable vendors to respond, the Citymay postpone the opening date accordingly. Insuch case, the addendum willincludean announcement of the new proposal submittal due date.
Attach alladdenda to the proposal. Failureto attach any addendum may render the proposal non- responsive and cause forrejection.
The Cityreserves the rightto award a contractto a company solelybased on the initialproposal submitted. The Cityreserves the rightto requiremore information and clarification on information submitted inthe proposal to complete the evaluation.
The CityCouncil reserves the rightto rejectany and allproposals received,to take allproposals under advisement fora period not to exceed ninety(90) days afterthe date of the opening, to waive any informalityon any proposal,and to be the solejudge ofthe relativemerits of the materialand or service mentioned inthe respectiveproposals received. The Cityreservesthe rightto rejectany proposal not accompanied with alldata or information required.
This Request forProposals does not commit the Cityto award a contractor to pay any cost incurred inthe preparationof a proposal.Allresponses to thisRFP document become the propertyofthe City of Torrance.
The Cityreserves the rightto examine allfactorsbearing on a Proposer’s abilityto perform the services under the contract.The City reserves the rightto rejectany proposal not accompanied with alldata or informationrequired. The City reserves the rightto cancel thissolicitation,withoutpenalty, at its sole discretion.
Affidavit:
An affidavitform isenclosed. Itmust be completed signifyingthatthe proposal isgenuine and not collusiveor made inthe interestor on behalf of any person not named inthe proposal, thatthe proposer has not directlyor indirectlyinduced or solicitedany other proposer to put ina sham proposal or any other person, firm,or corporationto refrainfrom proposing,and thatthe proposer has not inany manner sought by collusionto secure foritselfan advantage over any other proposer. Any proposal submitted without an affidavitor inviolationof thisrequirement willbe rejected.(Attachment 1)
Evaluation of Proposals:
The Citywillbe the sole determiner of suitabilityto the City’sneeds. Proposals are rated according to theircompleteness and understanding of the City’sneeds, conformance to the requirements ofthe technicalspecifications,compatibilitywith the City’scurrenttechnology and operations,prior experience with similarscope of work, financialcapabilities,delivery,and cost.Cost includingany ongoing maintenance and support cost are reviewed to determine which proposal best meets the needs of the City.
The Citywilltake intoconsiderationa localTorrance vendor sales tax rebate of 1% forproposals submitted by a Torrance vendor that include a materialcomponent. 4 21
The City’sprojectevaluationteam willevaluateproposalsbased on the evaluation criteria listed below. Pointswillbe assigned to each criterionup to a maximum of 100 points.Proposals willbe ranked and thatrankingwillbe made public.
Subsequently,the Citymay interviewa qualifiedFirm,priorto deciding whether to recommend the award of an Agreement.
Description of Evaluation Criteria Possible Points
Understanding of the project and scope of work; and
completeness of the RFP: Demonstrated understanding of the project goals as presented in the RFP, thoroughness of the proposal, and abilityto comply withthe terms ofthisRFP.
30 Qualifications of proposed project team: The project team’s qualifications,capabilityand strengths,along with a demonstration of previousexperience with similarprojectsby allpersonnel identified for the project.
20 Project Cost: Cost effectivenessand competitivenessfor proposed services in relationto other proposals.
20 Project Schedule: Abilityto complete the projectwithinthe required timeframe.
25 References: Verification of listof references for recent similarprojects 5 Maximum Total Points = 100
PART I- EVALUATION OF PROPOSALS: Afterreceiptof proposals forthisproject,the City’s projectevaluationcommittee willevaluate proposalsbased on the criterialistedbelow (with exception of cost),and develop a shortlistof qualifiedFirms. The Firms on this short listwill be invitedto interviewwith the City.
Qualifications-BasedSelection(QBS) Californiastatuterequiresallgovernment agencies—both state and local—^toutilizeQBS inGovernment Code §4525, and itsfollowingsections:
“Notwithstandingany other provisionof law,selectionby a stateand localagency head for professionalservices...shallbe on the basis of demonstrated competence and on the professionalqualificationsnecessary forthe satisfactoryperformance ofthe services required.” Landscaping, Engineering,Architectural,Surveying,And ConstructionManagement: The retention of professionalservicesforarchitectural,landscape architectural,engineering,land surveying or constructionprojectmanagement shallbe on the basis of demonstrated competence and on the professionalqualificationsnecessary forthe satisfactoryperformance of the services required,and at fairand reasonable pricesto the city,inaccordance with section 4526 of the Government Code.
A Request forProposal and/or Statement of Qualificationsshallbe prepared by the initiatingcity department, and proposal requests solicited,where practical,from at leastthree (3)professional services providers.
PART II- INTERVIEW: At the time of the interview,invited Firms must submit a detailed fee proposal thatincludesa cost foreach task ofthe projectusing the tasks outlinedinthe Scope of Work section of the RFP. Firms may listany additionalservices and associated costs that are not covered inthe City’sscope of work. These items should be listedseparately from those specificallyrequested so they may be considered.
5 22
PART III- POST INTERVIEW EVALUATION: Afterthe completion of the interviews and the scoringofthe interviewand costcomponents, the City’sprojectevaluationcommittee willinvite the highest-rankingFirm to negotiatea finalcontractbecause of thisRFP. Ifnegations fail,the next highest-rankingfirmwillbe invitedto negotiatea final contract.
Grant Funding Requirement:
This projectisfunded through Los Angeles County MetropolitanTransportationAuthority(Metro) Measure M Multi-YearSubregional Programs (MEASURE M MYSP) and limitedto Development, ProjectApproval/EnvironmentalDocument (PAED) and Plans, Specifications,and Estimates (PS&E).
ProjectID: MM4601.07
For more informationon MEASURE M MYSP, please visitthe embedded link below:
Measure M - Los Angeles Metro
The Contract:
The awarded vendor willbe required to enter intoa writtencontractwith the Cityof Torrance.
Attached separatelyinthe document sectionof PlanetBids isa copy of the standardized contract, which will be modified to reflect the awarded RFP. A copy of thisRFP and the accepted proposal will be attached to and become a partof the contract.
Prevailing Wage:
The State of CaliforniaSenate Bill7 (SB7) appliesto construction contracts over $25,000 and contracts for alteration,demolition,repairand maintenance over $15,000. There are no exemptions.
The contractissued because of thisRFP issubjectto prevailingwage. This RFP issubjectto prevailingwage rates.Current prevailingwage determinations rates may found at the State of CaliforniaDept, of IndustrialRelationswebsite
http://www.dir.ca.qov/oprl/DPreWaqeDetermination.htm
Contractor Registration the State of CaliforniaSenate Bill854 (SB854):
• No contractoror subcontractor may be listedon a bid proposal fora publicworks projectunless registeredwith the Department of IndustrialRelations pursuant to Labor Code section 1725.5 • No contractoror subcontractormay be awarded a contractforpublicwork on a publicworks project unless registeredwiththe Department of IndustrialRelations pursuant to Labor Code section 1725.5.
• Public works refers to construction, alteration,demolition,installation,or repairwork (including maintenance) done under contractand paid by publicfunds • This projectissubjectto compliance monitoring and enforcement by the Department of Industrial Relations.
• All contractors and subcontractors must furnish electronic certifiedpayrollrecords directlyto the Labor Commissioner (aka Divisionof Labor Standards Enforcement). • For additionalinformationand to registeronline go to http://www.dir.ca.qov/Public- Works/Pu blicWorks.html
6 23
Independent Contractor:
The successful proposer willat alltimes remain to the City,a wholly independent contractor. Neither the Citynor any of itsagents willhave controlover the conduct of the Contractor or any of the Contractor’semployees, except as otherwise set forthin the awarded Agreement. The Contractor’s agents and employees are not and willnot be considered employees of the Cityforany purpose. The Contractor may not,at any time or inany manner, represent that itor any of itsagents or employees are inany manner agents or employees ofthe City.The Cityhas no duty,obligation,or responsibility to the Contractor’sagents or employees under the AffordableCare Act. The Contractor issolely responsibleforany tax penaltiesassociatedwiththe failureto offeraffordablecoverage to itsagents and employees under the AffordableCare Act and any other liabilities,claims and obligations regardingcompliance withthe AffordableCare Act with respect to the Contractor’sagents and employees. The Cityisnot responsibleor liableforthe Contractor’sfailureto comply with the Contractor’sduties,obligations,and responsibilitiesunder the Affordable Care Act. The Contractor agrees to defend,indemnifyand holdthe Cityharmless foralltaxes and penaltiesthatmay be assessed againstthe Citybecause ofthe Contractor’sobligationsunder the AffordableCare Act relatingto the Contractor’sagents and employees.
Payments:
Complete payment on the contractpricewillbe made in approximately thirty(30) days from date of delivery,or completion and acceptance, unless otherwiseprovided forin Proposer’s proposal or in these specifications.Payments willbe made upon verificationand acceptance by the Cityof contract servicesperformed and upon the City’sreceiptof a correct invoice.
Suspension of Procurement:
The Citymay suspend, inwritingallor a portionofthe procurement of materialsor services pursuant to thisRFP and subsequent contractagreement, inthe event unforeseen circumstances make such procurement impossibleor infeasible,or inthe event.City should determine itto be inthe best interest of Cityto cancel such procurement ofservicesor materials.
In the event of termination,selected Proposer willperform such additionalwork as isnecessary forthe orderlyfilingof documents, and closingof project.
The selected Proposer willbe compensated forthe terminated procurement based on materials or services actuallyfurnished or performed priorto the effectivedate of termination,plus the work reasonably requiredforfilingand closing.
Notice of Intent to Award:
Approximately two (2)weeks priortothe anticipatedCity Council meeting awarding a contract because of the RFP, the Citywillnotifyallproposer’s of itsintentto award. Results willbe posted on the CityofTorrance Web sitehttps://pbsvstem.planetbids.com/portal/47426/portal-home 7 24
RFP for Preliminary Design and Environmental Analysis of Multi-Use Active Transportation TrailProject
RFP No. B2025-24
SECTION IITECHNICAL REQUIREMENTS
Overview/Introduction:
The City of Torrance isrequesting proposals from qualifiedvendors forPreliminaryDesign and Environmental Analysisfora Multi-ModalActiveTransportationTrail.
The projectarea islocated inthe Cityof Torrance, inthe Torrance Tract.The projectgoal isto connect the Mary K. Giordano TransitCenter to Downtown Torrance via a multi-modal active transportationtrail.Following the projectarea from west to east,the projectwould begin at the Torrance Transit Center area and cross Crenshaw Boulevard to Dominguez Street,then move east along Dominguez Streetand Dominguez Way. As Dominguez Street transitions and becomes Sartori Avenue and Border Avenue, the projectarea includesVan Ness Avenue to the north and Sartori Avenue to the south, moving southeast to Torrance Boulevard and terminatingin Downtown Torrance.
The projectarea ispart of a more comprehensive and integratedproposed activetransportationtrail- system Citywide, which has a broader visionand goals that include both vacant City-owned and land owned by Railroad Operators. The preliminarydesign and environmental analysisforthe multi-modal activetransportationtrailwillexplore primary and alternateroutingwithinthe projectarea. Please see ATTACHMENT 2 fora map indicatingthe projectarea.
This RFP isintended to be as descriptiveas possible. However, Proposers may not take advantage of omissions or oversightsinthisdocument. Proposers must supply products and servicesthatmeet or exceed the requirements of thisRFP. In the event of a dispute over installationor performance, the needs ofthe Cityof Torrance willgovern.
Scope of Work:
The proposal willincludethe PreliminaryDesign, Environmental Analysis,FinalDesign, and Project Management. Alldeliverableswhich requirethe preparationof documents shall be submitted as Portable Document Format (PDF) to the Cityvia CD or USB and Email.The awardee shallperform the followingtasks (considered a preliminaryoutline)to complete the project; Preliminary DesignI.
Tasks to be performed include,but are not limitedto,the following:
A. Conduct review and provide integrationof existingCitydocuments and plans.
Real time existingconditions,data collection,fieldsurvey and/or evaluation.
Provide survey or base maps, as applicable.
Any collisiondata and/or analysis,and travelpatterns,bike and pedestrian counts, as applicable.
Visioning, Community Engagement, Community Outreach and workshops.
Identifyand coordinate with ailutilitiesinthe projectarea to facilitatethe design of the Project.
Identifyright-of-wayacquisitions,and/or vacations to provide forthe optimal design of the trailsystem.
Creation of a draftplan with community inputreceived through outreach and workshops.
B.
C.
D.
E.
F.
G.
8 25
H. Listof potentialamenities,lighting,trashcans, benches, landscaping, bike station, fitnessequipment.
I. Consult with City’sPublicWorks Streetscape Divisionto discuss landscape options.
J. Creationof conceptualdesign/graphicswith preliminarycost estimates.
Environmental Analysis
Tasks to be performed include,but are not limitedto,the following:
A. Define a complete and detailedprojectdescriptionto determine level of California Environmental QualityAct (CEQA) review.
B. Conduct the requiredtechnicalanalysisforthe projectincludingconsiderationof Environmental Factors per the CaliforniaEnvironmental QualityAct (CEQA) Guidelines Section 15262 - Feasibilityand Planning Studies.
Final Design - Plans, Specifications and Estimates
Tasks to be performed include,but are not limitedto,the following:
A. Design the ultimatebuildout oftrailproject.
Prepare plans forthe required improvements, consistentwith Citystandards.
Prepare constructionspecificationsconsistentwith City standards.
Prepare an engineer’s constructioncost estimate based on the itemizedquantity take-off from the contract documents.
Submittal of the engineer’sconstructioncost estimate shallbe deliveredto the City at 65% complete, 90% complete and finalina spreadsheet format.
Prepare right-of-wayacquisitionand/or vacation cost estimates and timelines for the proposed designs ofthe trailsystem.
B.
C.
D.
E.
F.
Project Management and Preparation of Periodic Updated Schedule, Deliverables and Meetings
IV.
Tasks to be performed include,but are not limitedto,the following:
A. Meet as needed with the Cityto accomplish Projecttasks as outlined.Meetings expected between the vendor and City,shallbe and not be limitedto:Project Kick offMeeting, presentationof “Summary LetterReport”,progress meetings and preparation forthe Community Information Workshop at 90% design completion.
Allocate time to prepare to attend and/or present at two CityCouncil,two Planning Commission, and two community stakeholder meetings.
Provide periodicschedule updates on deliverablesand meetings as changes to originalschedule occur or as needed based on the needs of the project.
Conduct research and provide findingsof additionalfunding and/or grant opportunitiesforprojectconstructionand implementation.
Assist the City inthe preparationof a notificationlistand schedule foradjacent properties and for properties within a 500-foot distance bufferfrom the proposed routes. (Optional Task)
B.
C.
D.
E.
General Requirements:
Upon award of contract,vendor willbe requiredto maintain an activeCity of Torrance Business License and maintain allrequired insurance coverage as stipulatedinthe finalcontract. 9 26
Work Plan;
Priorto the beginning of the work, the successful proposer must provide the Citya schedule and work plan forapproval.Work plan must demonstrate the abilityto meet a timelinethrough work planning and/or a schedule consistentwiththe preliminaryprojectschedule. The Citymay adjustand/or acceleratethe schedule as necessary to assure projectcompletionby October 31®*,2025 Proposal Submittals:
Each proposal must contain the followingitems listedbelow. Vendors who do not provide these items in their Proposal willbe disqualified and their proposal will not be evaluated. • Cover Letterincludingthe name and address of the vendor, the telephone number to be used for contact,along with the name of the person(s) who willbe authorized to make presentationsforthe vendor, and a statement regarding vendor company or individualcapabilityto perform the specific tasks outlinedinthisrequest,and summary of background informationon the vendor. (Not to exceed three (3)pages)
• Background informationon the vendor firm/company.
• Listyour firm’sexperience with design and environmental analysis,to includedollaramount, type of project,and degree of success.
• Describe your firm’sapproach and abilityto deliverthe tasks as outlined in the RFP. • Schedule of the firm’shourly billablerates per staffperson. • A listof at leastthree (3) references for whom you or your firm have performed similarprojects.
Include the prior project name and description,contact name, company name, address and telephone number foreach reference.
10 27
RFP for Preliminary Design and Environmental Analysis of Multi-Use Active Transportation TrailProject
RFP No. B2025-24
SECTION III PROPOSAL SUBMITTAL
FAILURE TO COMPLETE ALL ITEMS IN THIS SECTION MAY INVALIDATE PROPOSAL.
In accordance with your "Request forProposals (RFP)", the followingproposal issubmitted to the City of Torrance.
RFP Submitted By:
Name of Company
Street Address City Zip Code
Telephone Number Fax Number
Printed Name/Title E-Mail Address
Signature Date
Form of Business Organization: Please indicatethe following(check one). □ Corporation□ Partnership□ Sole Proprietorship□ Other:
Do you have a Parent Company? □ No □ Yes,
Do you have any Subsidiaries? □ No □ Yes,
(Name of Parent Company)
(Name of SubsidiaryCompany)
Business History:
Years inbusiness under your currentname and form of business organization? Years Iflessthan three (3)years and your company was in business under a differentname, what was that name?
Contact for Additional Information:
Please provide the name of the individualat your company to contact forany additionalinformation:
Printed Name Title
Telephone E-Mail Address
11 28
Proposal Submittal (continued):
Vendor Name;
Addenda Received: (Itis mandatory to complete this section) Please indicate addenda information you have received regarding this RFP. Ifaddenda isnot attached to your bid submittal (per instructions),you are stillheld accountable to its contents.
Addendum No. Date Received Addendum No. Date Received
□ No Addenda receivedregardingthisRFP.
Payment Terms: The Cityof Torrance Payment terms are Net 30. The City does not make pre payments, or pay upon receipt.
Do you offerany discounted invoiceterms?
Project Start and Completion:
The Cityrequiresthe projectto startas soon as possiblefrom the award of a contractand the project completed as soon as possible.Specificperiods thatare mutually agreed upon willbe established after award of a contract. As outlined within the Measure M Multi-YearSubregional Funding Agreement, timelyuse offunding requiresexpending Funds granted forallowable costs withinthree years or 36 months from July 1 ofthe FiscalYear inwhich Funds are programmed. AllFunds programmed forFY 2022-23 are subjectto lapse by June 30, 2025.
Project Manager:
Please provide the name of the individualat your company who willserve as ProjectManager forthis contract.
Name Title
Telephone Number Fax Number Email Address
12 29
Vendor Name:
Sub Contractors:
Ifawarded, willyou be using sub contractorsto carryout the scope of work required inthisRFP? □ Yes, we willbe usingsub contractorsand have listedtheir contact information below. □ No, we willnotbe usingany sub contractorsforthisproject.
Company Name Contact Name Title
Telephone Number Fax Number Email Address
Please explain the working relationshipbetween your company and the sub contractor. 13 30
Proposal Submittal (continued):
Vendor Name:
Background and Recent Experience with Similar Projects:
In the space below, please provide a narrativeexplainingyour background and recent experience with similarprojectsas the scope of work identifiedinthisRFP. (Please attachadditionalsheet ifneeded.) 14 31
Proposal Submittal (continued):
Vendor Name:
Work Plan for Each Required Task:
Inthe space below, please describe indetailthe methodology you willbe utilizingto conduct foreach task. (Please attach additionalsheets ifneeded.)
15 32
Proposal Submittal (continued):
Vendor Name:
References:
Please supply the names of companies/agencies forwhich you recentlysupplied comparable goods/services as requested inthisRFP. A minimum of three(3)referencesisrequired;additional references are optional.References from publicagencies are preferred.Do not include the City of Torrance as a reference for this RFP.
Name of Company/Agency:
Street Address:
City:
State, Zip Code:
What Product/Service did you
provide to thisCompany/Agency?1
Name of Person to Contact:
Phone Number of Contact:
Email Address of Contact:
Name of Company/Agency:
Street Address:
City,State Zip Code:
What Product/Service did you
provide to thisCompany/Agency?2
Name of Person to Contact:
Phone Number of Contact:
Email Address of Contact:
Name of Company/Agency:
Street Address:
City,State Zip Code:
What Product/Servicedid you
provide to thisCompany/Agency?3
Name of Person to Contact:
Phone Number of Contact:
Email Address of Contact:
16 33
Proposal Submittal (continued):
Vendor Name:
RFP Submittal Requirement and Acknowledgement
Vendors are requiredto answer each of the questions listed below. You must indicate below that you have provided thisinformationinyour proposal submittal. You must attach additional sheets to your RFP submittal describing in detailthe service you are proposing.
RFP Scope of Work Questions Indicatewhat page inyour
proposal you have
answered this question.
□ Yes □ NoDid you includea signed AffidavitForm with your RFP Submittal? Did you attachadditionalsheets to answer the Background and Recent Experience with SimilarProjectsinformationon page this RFP?
□ Yes □ Noof
Page of our submittal.
□ Yes □ NoDid you complete a projectproposal as described inthe Technical Requirements?
□ Yes □ NoDid you review alladdenda, ifany, issued by the City? □ Yes □ NoDid you include resumes of no more than three (3)qualified candidates?
Page of our submittal.
□ Yes □ NoDid you include References?
Page of our submittal
□ Yes □ NoAre your Wage Rates (Non-Prevailing)Included? Page of our submittal.
17 34
Proposal Submittal (continued);
Vendor Name:
RFP Submittal Requirement and Acknowledgement Continued Vendors are requiredto answer each of the questions listed below. You must indicate below that you have provided thisinformationinyour proposal submittal. You must attach additional sheets to your RFP submittal describing in detailthe service you are proposing.
RFP Scope of Work Questions Indicatewhat page inyour
proposal you have answered
this question.
Did you describe your experience with PreliminaryDesign? □ Yes □ No
Page of our submittal.
Did you describe your experience with Environmental Analysis? □ Yes □ No
Page of our submittal.
Did you describe your work plan?
□ Yes □ No
Page of our submittal.
$Price proposal submittalto complete the work described in this RFP
18 35
Vendor Name:
Price Quote
In accordance with your "Request for Proposal", the followingpriceproposal issubmitted to the Cityof Torrance. We understand thatour pricesubmittal is a not to exceed amount and thatifwe are selected to enter intonegotiationswith the Citythe pricingmay be adjusted down unless additionalservicesare requested and pricingwillbe negotiatedand adjusted accordingly.The totalexpenditure for this grant may not exceed $650,000 USD Category Description
(Vendor must attached a fulldescriptionforeach category explaining what they are proposing)Allservicesmust be itemized. Do not bundle.
Proposal Not to
Exceed
Amount by Category
Description
Task I.A.Conduct review and provide integrationof existingCity documents and plans.
Task I.B.Real time existingconditions,data collection,fieldsurvey and/or evaluation. Provide survey or base maps, as applicable.
Task I.C.Any collisiondata and/or analysis,and travelpatterns,bike and pedestrian counts, as applicable.
Task I.D.Visioning,Community Engagement, Community Outreach and workshops.
Task I.E.Identifyand coordinate with allutilitiesinthe projectarea to facilitatethe design of the Project.
Task I.F.Identifyright-of-wayacquisitions,and/or vacations to provide forthe optimal design of the trailsystem.
Task I.H.Listof potentialamenities,lighting,trashcans, benches, landscaping, bike station,fitnessequipment.
Task l.l.Consult with City’sPublicWorks Streetscape Division to discuss landscape options.
Task I.J.Creation of conceptual design/graphicswith preliminarycost estimates.
$ USD
$ USD
$ USD
$ USD
$USD
$USD
$ USD
$USD
$USD
Task I.A-J;Preliminary Design - All tasks: $USD
Task II.A.Define a complete and detailedprojectdescriptionto determine levelof CaliforniaEnvironmental QualityAct (CEQA) review.
$USD
Task II.B.Conduct the required technicalanalysisforthe project includingconsiderationof Environmental Factors per the California Environmental QualityAct (CEQA) Guidelines Section 15262 - Feasibilityand Planning Studies.
Task II.A-B;Environmental Analysis - All tasks:
$USD
$USD
Task III.A.Design the ultimate build out of trailproject.
Task III.B.Prepare plans forthe required improvements, consistent with City standards.
Task III.C.Prepare constructionspecificationsconsistentwith City standards.
$USD
$USD
$USD
Task III.D.Prepare an engineer’s constructioncost estimate based on the itemized quantity take-offfrom the contract documents.
Task III.E.Submittal of the engineer’s constructioncost estimate shallbe deliveredto the City at 65% complete, 90% complete and finalin a spreadsheet format.
Task III.F.Prepare right-of-wayacquisitionand/or vacation cost estimates and timelines forthe proposed designs of the trailsystem. $USD
$USD
$USD
19 36
Task III.A-F;Final Design - PS&E - All tasks: $ USD
Task IV.A.Meet as needed with the Cityto accomplish Projecttasks as outlined.Meetings expected between the vendor and City,shall be and not be limitedto:ProjectKickoffMeeting, presentation of “Summary LetterReport”,progress meetings and preparationfor the Community Information Workshop at 90% design completion.
Task IV.B.Allocate time to prepare to attend and/or present at two CityCouncil,two Planning Commission, and two community
stakeholder meetings.
Task IV.C. Provide periodicschedule updates on deliverablesand meetings as changes to originalschedules occur or as needed based on the needs of the project.
Task IV.D.Conduct research and providefindingsof additional funding and/or grant opportunitiesforprojectconstructionand implementation.
Task IV.E.Assistthe Cityinthe preparationof a notification listand schedule foradjacent propertiesand forpropertieswithin a 500-foot distance bufferfrom the proposed routes. (Optional Task) Task IV.A-E; Project Management-All tasks:
$USD
$ USD
$ USD
$ USD
$USD
$USD
Total Amount for Project $USD
Price Proposal Cost Breakdown To Provide the Services Required in this RFP Description No. of Hours Labor Cost/hr ($) Cost
Preliminary Design (PA) $ $
Environmental Analysis
(ED) $ $
Final Design (PS&E) $ $
Project Management $ $
Total Price Proposal $
20 37
ATTACHMENT 1
STATE OF CALIFORNIA
PROPOSER’S AFFIDAVIT
COUNTY OF LOS ANGELES
being firstduly sworn deposes and says:
1. That he/she is the of
(Titleof Office) (Name of Company)
Hereinaftercalled“proposer”,who has submitted to the Cityof Torrance a proposal for (Titleof RFP)
2. That the proposal isgenuine; thatallstatements of factinthe proposal are true;
3. That the proposal was not made inthe interestor behalfof any person, partnership,company, association organizationor corporationnot named or disclosed;
4. That the Proposer did not,directlyor indirectly,induce solicitor agree with anyone else to submit a false or sham proposal,to refrainfrom proposing,or to withdraw his proposal,to raiseor fixthe proposal priceof the Proposer or of anyone else,or to raiseor fixany overhead, profitor cost element ofthe Proposer’s price or the priceof anyone else;and did not attempt to induce action prejudicialto the interestof the City of Torrance, or of any other Proposer, or anyone else interestedinthe proposed contract;
5. That the Proposer has not inany other manner sought by collusionto secure foritselfan advantage over the other Proposer or to induce action prejudicialto the interestsofthe Cityof Torrance, or of any other Proposer or of anyone else interestedinthe proposed contract;
6. That the Proposer has not accepted any proposal from any subcontractoror materialman through any proposal depository,the bylaws, rulesor regulationsof which prohibitor preventthe Proposer from considering any proposal from any subcontractoror materialman, which isnot processed through thatproposal depository, or which prevent any subcontractor or materialman from proposing to any contractorwho does not use the facilitiesof or accept proposals from or through such proposal depository;
7. That the Proposer did not,directlyor indirectly,submit the Proposer’s proposal priceor any breakdown thereof,or the contents thereof,or divulge informationor data relativethereto,to any corporation,partnership, company, association,organization,proposal depository,or to any member or agent thereof,or to any individualor group of individuals,except to the Cityof Torrance, or to any person or persons who have a partnershipor otherfinancialinterestwith said Proposer in its business.
8. That the Proposer has not been debarred from participationinany State or Federal works project.
Dated this day of .,20.
(Proposer Signature)
(Title)
21 38
J
>*
t
!
y.
i
t
I
■ i A
i H
i i ,1
1r '•)
,■51
M
f
%
t i
*>
3V'^
f'-' ts'
i
j ’“t" *
?: » ^
1 s-
I
f‘
I, V
■-1'.-
39 -■-.y
i /
!
o.=
SDIUJiSjr
0\
\
\
\ \
wV \\
w
\\
\
S'.
S' \\
\
wK) X
ro
r
\, w
\
A
S\r^
LL
v\
AJ
.N
s'"
\ \ 1
j X,
I )i
P i
W!iQ23ai353Gi
1 /
//\ 7 /
j \ V / //
A
,
I ■>'rrc:c.:t
7 V., ''
!.\ s>.
rn r s"r)\ \\ y
\\/ \
C\ P
!
/\ ■'• A
i
/
i \j \ >Rich!ofWay \/ \
7 w
V /V
x
\t
/I /
/.'r..iaroad /■ ./ >\\
\ /
w
\ \/ o\%\c 2;^; m Ss) rm
1 \
/ XJ
A,
J i. \
I }[I i A\/ 7
Figure2
m
z
fo
40 EXHIBIT B
PROPOSAL
[To be attached]
41 r
Torrance Active Transportation Trail
Exhibit “A” Scope of Services
group
. Scope Of Services Task Outline
PA&ED (PreliminaryDesign) Phase
Task A: Pre-Design Services
Subtask A.01
Subtask A.02
Subtask A.03
KickoffMeeting and FieldWalk
AerialSurvey and Base Mapping
Vehicle, Bike,Pedestrian Counts and CollisionData Collection Task B: PreliminaryDesign Services
Subtask B.Ol; DraftSchematic Package
Subtask B.02: Community Workshop #1 - Alignment Ideas
Subtask B.03: Revised Schematic Package
Subtask B.04: Community Workshop #2 - Revised Schematic Plan Presentation Subtask B.05: FinalSchematic Package
Subtask B.06: CityCouncil Presentation- FinalSchematic Package Approval Subtask B.07: AdditionalPublicMeetings (2 PC and ICC)
Task C: CEQA Compliance Services
Subtask C.Ol: Notice of Exemption
Task D: PA&ED Phase Project Coordination Services
Subtask D.Ol; ProjectCoordination & Management
Subtask D.02: ProjectDevelopment Team (PDT) Meetings
Subtask D.03: GO 88-B Processing& CPUC/UPRR Coordination PS&E (Final Design) Phase
Note: Tasks E and F are future services.The scope and deliverableswillbe refinedonce the project'sdesign isdeveloped through the PA&ED (preliminarydesign)process.
Task E: FinalDesign Services
Subtask E.Ol
Subtask E.02
Subtask E.03
Subtask E,04
Subtask E.05
Subtask E,06
Subtask E.07
Subtask E.08
Supplemental FieldSurvey
Subsurface UtilitySurvey
Geotechnical Investigation
Post ConstructionStormwater Management Plan
65% Draft Construction Documents
90% Draft Construction Documents
100% Draft Construction Documents
Bid-Ready Construction Documents
lil
RRM Design Group I Creating Environments Peopie Enjoy
i San Leandro jSanta Bar&ara }Ventura |San Juan Capist'ano jSan Diego jSeattle F^obert Camacho F''E'76597 • Steven vVeb^ter LS 7561 - JeffreyFerber,LA 2844 WWW. rrind es ia n. c o m
San Luis Obisc
a California corporation » Leonard Grant, Architect C26973 42 r Torrance Active Transportation Trail
Exhibit “A" Scope of Services
Phase Project Coordination Services
ProjectCoordination & Management
ProjectDevelopment Team (PDT) Meetings
UtilityCoordination
GO 88-B Processing
QA/QC Review
TaskF: PS&E
Subtask F.Ol:
Subtask F.02:
Subtask F.03:
Subtask F.04;
Subtask F.05:
If.Detailed Scope of Services
PA&ED (Preliminary Design) Phase
Task A: Pre-Design Services
Subtask A.Ol: KickoffMeeting and FieidWalk
To initiatethe design process and get the projectroiling,RRM's team willconduct a kick-offmeeting with the projectteam. Principally,thismeeting willprovide an opportunity to confirm the schedule'skey milestones.This meeting willalsoprovide a forum to discussthe data we've collectedthus far,identify any outstandingdata needs, and setdates forupcoming meetings and the open house.
Followingthe kick-offmeeting, RRM and the projectteam willwalk the alignment to confirm the multi modal activetransportationtrailalignment ingeneral and explore the section between Downtown Torrance and the RTC ingreaterdetail.The objectiveof thisfieldwalk isto evaluate siteconstraints, discussthe pros and cons of potentialalternativealignment options,and look forthe most feasible solutionsto implement Complete Streetand multi-usetrailstrategies.
Deliverables:
• Prepare for and conduct one (1)kickoffmeeting
• Prepare for and conduct one (1)fieldwalk
• Meeting and fieldwalk notes
Subtask A.02: AerialSurvey and Base Mapping
RRM's surveyor, Guida Geospatial Solutions (Guida),willconduct survey work within the project area to create a base map filesuitablefor design work. The survey scope willincludethe followingcomponents:
Aerial TopoRraphic Mapping
• Establishsurvey control referenced to the NAD83 CaliforniaCoordinate System, Zone 5 horizontal datum by tiesto CSRC Continuous GPS stationsand to the NAVD88 datum by tiesto availableCity of Torrance benchmarks
• Prepare ProjectControl Map with detaileddatum notes,coordinate listing,and an accuracy statement
m
43 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Set aerialmapping targetsas directedby our aerialmapping subconsultant Coordinate with aerialmapping subconsultant to obtain coloraerialphotography. Topographic mapping willbe compiled at a scaleof 1-inchequals 20 feetusingstandard photogrammetric methods as an AutoCAD/Civil3Ddrawing filewith a DigitalTerrainsurface Model (DTM) Aerialmapping subconsultant willproduce an ortho-rectifiedimage using standard photogrammetric methods as a georeferenced TIP file
Right of Way Mapping
• Download latestCIS parceldata from Los Angeles County websites • Identifyfivesignificantproperty cornersalong the length of the projectthat can be used to confirm and adjustthe GIS landnet mapping
• Research record maps to selectthe fivecorners where a survey monument exists.Perform a field survey to tiethe fivemonuments intothe projectcontrolsystem Overlay GIS landnet mapping and the fivemonuments, and adjustthe GIS mapping to the project controlsystem
Prepare AutoCAD drawing with assessor parceland streetright-of-waylinework.The limitsof the landnet mapping willcorrespond with the aerialtopographic mapping Deliverables:
• Digitaltopographic map fileinAutoCAD format
• DigitalTerrainModel
• Color digitalorthophotos
Subtask A.03: Vehicle, Bike, Pedestrian Counts and Collision Data Collection RRM's trafficengineer, Fehr & Peers,willcollectvehicle,bicycle,and pedestrian counts at three locations between the RTC and Downtown Torrance to assess existingactivitylevelsand localcirculationpatterns.
The locations are:
• Dominguez Streeteast of Crenshaw Boulevard
• SartoriAvenue between ArlingtonAvenue and PortolaAvenue • SartoriAvenue between Torrance Boulevard and Engracia Avenue Vehicle volume and speed counts willbe taken as dailysegment screen linecounts for a Tuesday and a Saturday at allthree locations.Additionally,vehicleclassificationcounts willbe collectedon Dominguez Street (eastof Crenshaw Boulevard),near the RTC. These locationsaim to capture the amount of vehiculartraffictravelingalong the multi-modal activetransportationtrailalignment. Data collectionwill include volume, speed, and vehicle classificationinformation along the corridorto gain a better understanding of the type of activityoccurringwithinthe study area today and inform the facilitytype.
Bicycleand pedestrianvolume counts willoccur on a Saturday from 11:00 AM to 2:00 PM at allthree locations.The bicycleand pedestriancounts willbe taken as screen line counts that will allow us to III
44 r Torrance Active Transportation Trail
Exhibit “A" Scope of Services
assesshow many people walk or bikethrough thisarea and their direction of travel on a weekend at midday, which isanticipatedto be one of the peak activityperiods.
Collisiondata forthe corridorwillbe collectedcoveringthe most recent 5-year period for which complete collisiondata isavailable.The DC Berkeley SafeTREC TransportationInjuryMapping System (TIMS) or other locallypreferredgeocoded collisiondatabase will be used.
Consistentwith the goal of prioritizingCityROW and not usingthe railproperty as part of the strategy, parking data on Sartor!Avenue willbe collectedto evaluate parking supply and utilizationalong Sartori Avenue to determine how impactfulthe conversion of parking to a high-qualityactivetransportation connection along SartoriAvenue would be. Hourly parkingoccupancy sweeps willbe collectedon a weekday between 3:00PM and 8:00PM along SartoriAvenue, PortolaAvenue, ArlingtonAvenue, Cravens Avenue, and EngraciaAvenue, when most residentswould be expected to be home. This willofferinsight intothe levelof parking utilization,where a low parking utilizationwould suggest that parking could be converted, while there would stillbe parking availableon nearby cross-streets.Ifparking conversion is not an option,other alternativescan be explored.
Deliverables:
• Segment/intersectioncounts and analysis
• Collisionanalysis
• Parking supply and occupancy data
• Briefmemorandum summarizing resultswith tablesand figures Task B: PreliminaryDesign Services
Subtask B.Ol:Draft Schematic Package
The ActiveTransportationtreatments presented inthe Approach sectionof our proposal are in response to the settingof each of the fivecorridorsegments (Segments A-E) we've developed from our field investigations.The fiveSegments are furtherdescribed below, followed by the draftschematic package task contents.
Segment A: "Transit Link"
This segment followsthe east side of Crenshaw from the RTC's existingsignalizedcrosswalkdown to Dominguez and consistsof a Class Imultiuse path.This path willbe separated from Crenshaw Blvd.to avoid high speeds and volumes of vehicles.
Note: An option to add a new trafficsignaland crosswalk at Crenshaw and Dominguez to connect the trail directlyto the RTC willbe explored forthissegment.
Segment B, the "Road Diet"
This segment heads east from Crenshaw Blvd.over to about Acacia along the northern edge of Dominguez. The approach here employs a "Road Diet"strategyto reduce the roadway and convert to a ClassImultiuse path.
ill
45 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Segment C, "Abandoned Rail Corridor"
For thissegment, the ClassIseparated multiuse path moves intothe City-owned abandoned railcorridor parallelingDomguez and continues east and then south to Portola.
Segment D, "Complete Street"
The ClassImultiuse path transitionsto Complete Streettreatment with high-visibilitygreen ClassIIbike lanesor sharrows on Sartori'snorth/south one-way couplet. Pedestrians are directed to the sidewalks shaded with new streettreesfor an attractivewalking experience in Downtown Torrance.
Note: Longer term.Segment D could become a RailTrailprojectifthe Citypursues acquisitionof a portion of the UPRR right-of-wayto extend the ClassIpath from Portola down to Torrance Blvd.
Segment E, "Scramble Intersection"
This segment isthe transitionintoDowntown Torrance and includesa "Scramble Intersection"setup.
Flere,working with our trafficteam, the intersectionsignalphasing would be modified to shut vehicle trafficoffon allintersectionapproaches and to allow pedestrians and bikesto crossTorrance Blvd.in all directions,includingdiagonally(though not required).
in the spiritof exploration,RRM's team willdevelop a draftschematic package inthe form of a seriesof drawings illustratingthe multi-modal activetransportationtrailcorridor'sprimary and alternative alignment options,access points,and streetcrossingideas.The drawings willaddress the followingmajor components:
• ClassITrailAlignment
The trail'sfullsectionand alignment forSegments A, B,and C willbe developed to locateItwithinCity property and separated from vehiculartraffic.The drawings willshow Right-of-Way (ROW), amenities such as seatingareas,shade structures,and wayfindingsignage.Conceptual levelgradingwillbe shown to demonstrate how the trailwill work within the available space, how itwillconnect to streetgrades, and where potentialretainingwallswillbe located.
• Neighborhood StreetCrossings
Along Segment C at Acacia,Madrid, Amapola, and Cota,conceptual-levelplans willbe developed to show new crossingdesignsto linkthe adjacent neighborhood to the ClassItrailalong Dominguez. This scope assumes the Citywillprovide recent trafficcount data for Dominguez and the intersectingstreets.
Along Segment D at Portola,Arlington,Cravens, and EngraciaAvenues, conceptual-levelplans willbe developed to show the new bike lane alignment, new crosswalk striping,and trafficcontroldevices specificto each crossinglocation.This scope assumes the Citywillprovide recent trafficcount data for Sartoriand the intersectingstreets.
• SartoriComplete Street Alignment
Complete StreetstrategiesforSegment D willbe developed to locate improvements within the City's38 foot ROW to linkpedestriansand cycliststo the ClassImultiuse trailterminus inSegment C and lil
46 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Downtown Torrance.The drawings willincluderoadway restripingto add high-visibilitygreen ClassIIbike lanes and/or Sharrows ineach directionfor cyclists,and improving the sidewalksalong Sartorito attract pedestrianswith a shaded, cool path of travelaway from vehicles.An option on the northeast side of Sartorito move the curb,gutter,parkway, and sidewalkback a few feet to accommodate a full-width Class IIbike path willalso be explored.
• Track Crossings
At Portola,Arlington,Cravens, and EngraciaAvenues inSegment D, east/west pedestrianfacilitieswillbe developed to complete each intersectionto provide a clearpath of travelto crossSartori.This includes crossingthe UPRR trackswithin the City'sROW. RRM's team willprepare conceptual levelcrossing drawings to illustratethe crossingconfiguration,trackpanel placement, striping,and signage improvements.
• Torrance Boulevard Crossing
At Torrance Boulevard inSegment E,RRM's team willexplore intersectiondesign,signalphasing, includinga scramble phase, and lane configurationoptions to connect the Sartorialignment with Downtown Torrance. RRM's team will obtain new traffic counts for alllegsof the Torrance and Sartori intersection.
• Lighting
An overhead traillightingsystem between the Crenshaw and PortolawithinSegments B and C willbe explored and developed. The drawings willshow lightpost locations,pointsof connections,and mounting heights.
The draftschematic design package willbe communicated through a combination of plan view graphics and sectionsas deemed appropriate by RRM. The package willbe shared with the publicat the upcoming community meeting.
Deliverables:
• Draftschematic design plan package
Subtask B.02: Community Workshop #1 - Alignment Ideas
RRM willfacilitatea community workshop to describeeach of the multi-modal activetransportationtrail corridor'ssegments and share initialalignment ideas and options along the route. The routing ideas will be presented and evaluated through an interactiveprocess with the goal of arrivingat a preferred plan.
We envisionthe workshop program as follows:
Open house session (informaldiscussionand viewing exhibits) Presentation of conceptual alternativedesigns (PowerPoint or similar) Breakout group review of alternatives
Interactivealignment consensus exercise
Wrap up and next steps announcement
III
47 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
This process willallow RRM's team to move forward with a clearlydefined alignment and advance the projectto the revisedschematic package level.
Deliverables:
• Prepare forand conduct one (1)community workshop
• Workshop photos and graphic materialfor posting
• Workshop summary memo
Subtask B.03: Revised Schematic Package
Based on the resultsof the community workshop and the City'sdirection,RRM's team willdevelop the preferred multi-modal activetransportationtrailalignment to a revisedschematic plan levelfor presentationback to the community at an upcoming second community workshop. The package will provide more detailson the project'smajor components, such as:
Trailalignment through each corridorsegment
Amenities along the route
Retainingwall locations
Bike lane design
Sidewalk improvements
Street/trackcrossingdesign
Bike/pedestriantrafficcontroldevices
Lane restriping
Trafficsignalmodifications
Lightinglocations
Street tree locations
The revisedschematic design package willinclude a cost estimate and willbe communicated through a combination of plan view graphics,sections,and three (3) perspectivevisualizationsto illustratevarious projectconditionsalong the corridor.
Deliverables;
• Revisedschematic design plan package
• Three (3)perspectivevisualizations
• One (1)preliminarycost opinion
Subtask B.04: Community Workshop #2 - Revised Schematic Pian Presentation Now with the revised schematic package ready to share, RRM willfacilitatea second community workshop. The goal isto review the ideasgenerated at the earlierworkshop and how the community influencedthe ultimatedesign,and then present the revisedschematic design'skey features.We envision the workshop program as follows:
• Open house session (informaldiscussionand viewing exhibits) il
48 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Presentation of the Revised Schematic Plan (Po\A/erPointor similar) Interactive comment collection at the Boards
Wrap up and next steps announcement
Deliverables:
• Prepare for,and conduct one (1)community workshop
• Workshop photos and graphicmaterialfor posting
• Workshop summary memo
Subtask B.05: FinalSchematic Package
Based on the comments received at the second community workshop and the City'sdirection,RRM's team willdevelop the finalschematic package to a 30% constructiondocument level.At thisstage,the project'smajor components described inSubtask B.03 willbe clearlycommunicated and packaged for presentationto the CityCouncil,The finalschematic design plan package willbe communicated through a combination of plan view graphics,sections,elevations,and visualizationsprepared inSubtask B.03,and willincludean updated cost estimate.
Deliverables:
• Finalschematic design plan package
• One (1)updated preliminarycostopinion
Subtask B.06: City Council Presentation - FinalSchematic Package Approval RRM willwork with the clientteam to prepare for and present the finalschematic design plan package to the CityCouncil.The goal of thispresentationisto communicate the finalschematic design and share the project'skey highlights.The other goal of thismeeting isto seek approvalof the schematic design package so our CEQA planner can post the Notice of Exemption (NOE) with the County of Los Angeles County Clerk,and the design team can proceed to the finaldesign phase. RRM willdevelop a PowerPoint and/or other presentationsupport media/graphics as determined appropriate by the City/RRM team for the presentationviaan online meeting platform.
• Prepare for and present the finalschematic design plan package to CityCouncil • Support media/graphics
Subtask B.07: Additional Public Meetings
RRM willwork with the clientteam to prepare forand present the projectat up to four additionalpublic meetings in additionto the meetings included inTask B.This scope assumes up to two Planning Commission meetings, one additionalCityCouncil meeting. RRM willdevelop a PowerPoint and/or other presentationsupport media/graphics as determined appropriate by the City/RRM team forthe presentation.
ill
49 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Deliverables:
• Prepare forand presentthe projectat up to three (3)additionalpublicmeetings • Support media/graphics
Task C: CEQA Compliance Services
Subtask C.Ol: Notice of Exemption
The improvements proposed forthe planned multi-modal active transportation trail\A/ouldbe considered a projectunder the CaliforniaEnvironmental QualityAct (CEQA) and would requireappropriate environmental compliance documentation. Article19 of the CEQA Guidelinesprovidesa listof classesof projectsthat have been determined not to have a significanteffect on the environment and therefore can be exempt from the provisionsof CEQA. The projectscope of work includesimprovements inthe publicright-of-waythat provide fora continuous multi-usepath,but utilizesdifferenttypes of opportunitiesto upgrade existingfacilitiesalong the route to accommodate pedestriansand cyclists.
Based on these assumptions, the design which optimizes the existingright-of-wayand providesthe community benefitof a continuous multiuse path from the RegionalTransitCenter to the core of downtown Torrance, preliminarilyappears to qualifythe projectfora CategoricalExemption through two categories-Class1 (ExistingFacilities)and Class4 (Minor Alterationsto Land).
RRM proposes to analyze the projectfor CEQA compliance and anticipatespreparationof a Notice of Exemption (NOE) usingthe standard Notice of Exemption form contained inAppendix E of the CEQA Guidelineswith a briefsupporting analysisrelyingon existingavailableinformation.No new technical analysisisproposed. Within fivedays followingthe approval of multi-modai activetransportationtrail improvements by the CityCouncil,RRM willpost the NOE with the County of Los Angeles County Clerk, and Citystaffwillbe responsiblefor posting the NOE at Cityfacilities.Inthe event that proposed improvements are more substantialand determined to potentiallyhave a significanteffecton the environment, RRM would outlineneeded strategies,and thistask and budget would be reviewed and rescoped as needed.
Deliverables:
• Review of existingavailable,relevantdocumentation
• Notice of Exemption (NOE) completed form with briefsupporting analysis Task D: PA&ED Phase Project Coordination Services
Subtask D.Ol:ProjectCoordination and Management
RRM's project manager willcoordinate with the City,design staff,sub-consultants,and other agencies as necessary on an ongoing basisthroughout the PA&ED phase of the project.This task alsoincludesproject schedule creationand maintenance as tasks are completed, document review,and day-to-day project coordination efforts,includinggeneral correspondence and telephone conferencing as required to support Citystaffduring the Project'sdevelopment.
Ill
50 ■yi :
: !
Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Deliverables:
• Memos, meeting minutes,projectschedule maintenance, and generalcorrespondence for document control,compiled inelectronicfileform
• Projectschedule creationand maintenance
Subtask D.02: ProjectDevelopment Team (PDT) Meetings
RRM's projectmanager, and appropriateteam member(s) as the subjectmatter dictates,willprepare for and attend up to five(5)PDT meetings with the Clientteam duringthe PA&ED phase of the project.This scope assumes two (2)meetings willbe in-personmeetings and three (3)meetings willbe conducted via Teams, or another acceptable video conference platform.These meetings willprovide an opportunity to collectivelyreview,discuss,and clarifyany design issuesso that work may proceed inan efficientmanner.
Deliverables:
• Prepare forand facilitateup to two (2)in-personPDT meetings • Prepare forand facilitateup to three (3)video conference PDT meetings • Prepare and distributemeeting notes
Subtask D.03: GO 88-B Processing & CPUC/UPRR Coordination Based on the schematic design,RRM and our railroadengineer, RailPros,willcoordinate with the CaliforniaPublicUtilitiesCommission (CPUC) to process GO 88-B permit applicationsfor modifying the fiveactiveat-graderailroadtrackcrossingsinthe SartoriAlignment sectionand atTorrance Blvdto add in bike lanesand pedestrianfacilities.The modificationlocationsare at Portola,Arlington,Cravens, and EngraciaAvenues, and Torrance Blvd.As partof thistask,RailProswillfacilitatea virtualdiagnosticand a one-day on-sitefielddiagnosticmeeting with CPUC, City,and RailOperator/Owner (UPRR) staffatthe proposed crossingmodificationlocationsto develop design consensus forthe modifications.
Deliverables:
• Facilitateone (1)virtualdiagnosticmeeting
• Facilitateone (1)fielddiagnosticmeeting
• Fielddiagnosticnotes
PS&E (Final Design) Phase
Note: Tasks E and F are future services.The scope and deliverableswillbe refinedonce the project'sdesign isdeveloped through the PA&ED (preliminarydesign)process.
Task E: FinalDesign Services
Subtask E.OTSupplemental FieldSurvey
As the Projectmoves from the preliminarydesign phase to the 65% construction document level,the engineering team willdevelop a finalset of survey data capture mark-outs. Guida willpickup the requested fieldsurvey data,which istypicallyfocused on additional tie-in horizontal and vertical control 1 51
r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
pointsto complete the engineering design.Supplemental data willbe incorporated intothe Projectbase file.
Deliverables:
• Supplemental fieldsurvey data inAutoCAD format
Subtask E.02; Subsurface UtilitySurvey
With the project'slimitof work establishedat the conclusionof the PreliminaryDesign task (TaskB), RRM's willutilizeGuida to map existingutilitiesto locatepotentiallyaffectedutilitiesinthe projectarea.
Underground utilitieswillbe located,marked, and surveyed with the data downloaded directlyto the AutoCAD base file.RRM willprepare and submit utilitynotificationlettersto potentiallyaffectedutilities inthe projectarea as part of Subtask E.03.
Deliverables:
• Underground utilitiesinAutoCAD format
Subtask E.03; Geotechnical Investigation
With the project'slimitof work establishedat the conclusion of the PreliminaryDesign task (Task B), RRM's geotechnicalengineer,GPI,willconduct geotechnicalinvestigationsand prepare a draftand final geotechnical report.Work willincludeliteraturereview,sitereconnaissance, and fieldmarking of test boring locations,drillingand sampling of two subsurface borings,infiltrationtestingat two testlocations along the alignment, laboratorytesting,engineering analysis,and preparation of a draftgeotechnical investigationreport.Followingone round of reviews by the team, we willincorporatethe review comments intoa finaldesign-levelgeotechnicalinvestigationreport.The report'sfindingswillbe used to develop geotechnicalrecommendations forthe design of pavements, hardscape/walkways, retaining walls,and foundations for minor structuressuch as sitewallsand lightpoles.The report willalsodevelop geotechnicalrecommendations forwater qualityand treatment design.This scope assumes an encroachment permit willbe required forthe fieldworksinceitwilltake placeon Cityrights-of-way.
Deliverables:
• Draftgeotechnical report
• Finalgeotechnical report
Subtask E,04: Post Construction Stormwater Management Plan RRM willprepare a Post Construction Stormwater Management Plan based on the City'sMunicipal Separate Storm Sewer Systems (MS4's).The plan willbe developed to take advantage of any proposed siteimprovements to utilizelow-impact techniques to provide water qualitytreatment. Where possible, source controltechniques willbe proposed, low maintenance and simple solutions willbe sought over proprietaryBest Management Practices(BMPs) when possible.The Stormwater Management Plan willbe submitted to the Cityfor review. Itwillquantifyand describe the post-constructionBMPs to be used in the project.Based on the City'scomments, RRM willrevisethe Stormwater Management Plan.A project plan willbe included,illustratingthe projectsite.Drainage Management Areas (DMA's), and the location of BMPs. Operations and maintenance procedures willbe defined.
Ill
52 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Deliverables:
• One (1)draftpost-constructionstormwater management plan • One (1)finalpost-constructionstormwater management plan Subtask E.05: 65% Draft Construction Documents
RRM willprepare 65% DraftConstructionDocuments (seeConstruction Document Package Contents listedinSection V) based on the approved finalschematic plan package. The 65% DraftConstruction Documents willbe submitted to the City'sProjectManager for distribution and review.
Deliverables:
• 65% DraftConstructionDocument package (electronicfile) • One (1)constructioncost opinion (electronicfile)
Subtask E.06: 90% Draft Construction Documents
RRM willprepare 90% DraftConstruction Documents that address plan-check comments generated from the City'sreview of the 65% construction document submittal. The 90% Draft Construction Documents willbe submitted to the City'sProjectManager fordistributionand plan-check.
Deliverables:
• 90% DraftConstruction Document package (electronicfile) • 65% response to comments memo (electronicfile)
• One (1)constructioncost opinion (electronicfile)
Subtask E.07:100% Draft Construction Documents
RRM willprepare 100% DraftConstructionDocuments, address plan-checkcomments generated from the City'sreview of the 90% construction document submittal. The 100% Draft Construction Documents willbe submitted to the City'sProjectManager for distribution and back-check.
Deliverables:
• 100% DraftConstruction Document package for back-check (electronicfile) • 90% response to comments memo (electronicfile)
• One (1)Updated Construction Cost Opinion
Subtask E,08: Bid-Ready Construction Documents
RRM willprepare the Bid-Ready Construction Documents to address any back-check comments generated from the City'sreview of the 100% construction document submittal. Once the final revisions are complete, one (1)signed reproducible Bid-Ready set of Construction Documents will be submitted to the City'sProjectManager forfinalCity/Agencysignaturesand bidding.
Deliverables:
• One (1)signed reproducibleBid-Ready constructiondocument package (electronicfile) lil
53 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Task F: PS&E Phase Project Coordination Services
Subtask F.Ol:Project Coordination and Management
RRM's projectmanager willcoordinate with the City,design staff,sub-consultants,and other agencies as necessary on an ongoing basisthroughout the PS&E phase of the project.This task alsoincludesproject schedule creationand maintenance as tasksare completed, document review,and day-to-day project coordination efforts,includinggeneral correspondence and telephone conferencing as required to support Citystaffduring the Project'sdevelopment.
Deliverables:
• Memos, meeting minutes, projectschedule maintenance, and general correspondence for document control,compiled in electronicfileform
• Projectschedule creationand maintenance
Subtask F.02: Project Development Team (PDT) Meetings
RRM's projectmanager, and appropriateteam member(s) as the subjectmatter dictates,willprepare for and attend up to five(5)PDT meetings with the Clientteam during the PS&E phase of the project.This scope assumes two (2)meetings willbe in-personmeetings and three (3)meetings willbe conducted via Teams, or another acceptablevideo conference platform.These meetings willprovide an opportunity to collectivelyreview,discuss,and clarifyany design issuesso that work may proceed inan efficientmanner.
Deliverables:
• Prepare forand facilitateup to two (2)in-personPDT meetings • Prepare forand facilitateup to eight(8)video conference PDT meetings • Prepare and distributemeeting notes
Subtask F.03: UtilityCoordination
RRM's team willwork with utilitycompanies whose facilitiesare known to be locatedwithinthe Project limitsand may be affectedby the proposed improvements. RRM willprepare and submit utility notificationlettersto potentiallyaffectedutilitiesinthe projectarea. RRM willcoordinate the trail's design with affectedutilityrepresentativesand prepare exhibitsof the proposed improvements for submittal and review by these affected utilities.
Deliverables:
• Prepare and submit projectnotificationlettersto affected utilitycompanies Subtask F.04: GO 88-B Processing & CPUC/UPRR Coordination Based on the finalschematic design and fielddiagnosticoutcome, RRM and our railroadengineer, RailPros,willprepare the application,develop exhibitsfor the applicationpackage, and submit the applicationto the CPUC for approval.
The approved engineeringcrossingdesign willbe incorporatedintothe construction document package.
This scope excludes preemption calculationsand assumes any crossingequipment modificationswillbe III
54 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
within the scope of requirements of a GO 88-B permit and excludes the pursuitof a Formal Application for a railcrossingproject.
Deliverables:
• Five(5)At-Grade crossingexhibits
• Five(5)CPUC GO 88-B applications,processing,and coordination Subtask F.05: QA/QC Review
At the 65%, 90%, and 100% construction document milestones, RRM willconduct an internalQA/QC review. RRM assignsan in-house QA/QC manager who isnot a part of the design team. Using RRM's QA/QC checklist,a QA/QC team that isnot part of the design team willreview the projectto ensure disciplinesare fullycoordinated, key information isincluded,references pointto the correctlocation,and specificationsare tiedto the drawings.This review and correctivemeasures willoccur priorto each package (65%, 90% & 100%) being submitted to the City.
Deliverables:
• QA/QC comments incorporatedintothe 65% DraftConstructionDocument package • QA/QC comments incorporated intothe 90% DraftConstruction Document package • QA/QC comments incorporatedintothe 100% DraftConstructionDocument package III.Client Responsibilitiesand Assumptions
• Meeting locationand facilities
• Publicmeeting noticing
• Qne contact person who willserve as the City'srepresentativeand willconsolidateallAgency review comments into one listof official comments to which RRM can respond • Prepare bid and contract"boilerplate"documents, such as bidform, invitation,instructions,generaland specialconditions,contractforms, insurance forms, etc.
• Document distributionfordesign reviews,bidding,and construction • Bidding and constructionmanagement, inspection,and testing • Projectspecificationswillbe prepared inGreenbook format • The projectwillqualifyfor a CategoricalExemption through two categories- Class1 (ExistingFacilities) and Class 4 (Minor Alterationsto Land)
• The projectwillbe located completely on City property,and no property acquisitionsor easements are required
• Additional intersectioncounts and levelof service (LOS) analysisare not proposed because itisnot anticipatedthat the project would resultin the reduction of a travellane,therefore segment and intersectioncapacitywould remain the same
• Potable water servicefor irrigationsystems willbe utilized lil
55 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
IV.Limitations of Scope
Please note thatthe tasksto be performed by the RRM team are limited to those outlined above. This scope of servicesexcludes the following:
• Right-of-Way acquisitionnegotiationservices
• Record boundary survey
• Preparation of the SWPPP and SMARTS registration(contractor'sresponsibility) • Utilityanalysisor improvement beyond projectlimit
• Utilityvideotaping
• NEPA compliance services
• More than one (1)bid package
• Payment of fees (permit,processing,noticing,etc.)
• Arborist services
• Recycled water permit
• New trafficsignaldesign at Crenshaw and Dominguez
• Grant funding research
Any additionalservicesthat RRM Design Group isasked to perform over and above the tasksdescribed above willbe billedon a negotiated and City-approvedfixedfee or hourly basisas additionalservices. >5
56 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
V. Construction Document Package Contents
Title and Reference Sheets
RRM willprepare titlesheets,as necessary,to convey allpertinentgeneral projectinformation.These sheets may includeprojectname, location,approval blocks,agency contact information,USA alert,basis of survey statement, listof abbreviations,phasing,and/or additivealternateinstructions.
Demolition Plans
RRM willprepare demolition plans,at an appropriate scale,forstructuresand elements requiring removal inorder to implement the Project'sdesign.The plans willlocate,identify,and describethe removal items and provideinstructionsforthe safedisposalof the demolished work. Additionally,the plans willindicateitems to salvage or stockpile.
Erosion Control Plan
RRM willprepare Erosion Control Plansforthe sitedepictingproposed constructionBest Management Practices(BMP's) in conformance with the State Construction General Permit.The plans willincludeplan views with locationsof proposed BMP's, and detailsof the BMPs. This scope assumes the Contractor will prepare the SWPPP.
Construction Keynote Plans
RRM willprepare constructionkeynote plans,at an appropriate scale,forthe approved design.The plans willpresent the overallProject'slayoutwith a keynoting system that identifiesallconstruction items, referencesto appropriate details,and drawing seriesdirections.
Site Construction Details
As a companion to the construction plans,RRM willprepare detailsfor allthe construction items illustratedon the siteconstructionplans.The detailswillspecifymaterials,dimensions, colors,and finishes.
Cross Sections
As a companion to the constructionplans and details,cross sectionsof the trailwillbe created at regular spacing to communicate the intentof the Projectto the contractor.
Horizontal Control and Profile Plans
RRM willprepare horizontalcontrol and profileplans,at an appropriate scale,for the approved design.
The plans willestablishallhorizontalcontrolforthe Project.The plans willalsoestablishconstruction layoutcontrolpointsand establisha coordinate system for locatingallsiteelements.
Grading and Drainage Plans
RRM willprepare grading and drainage plans and profiles,at an appropriatescale,forthe approved design based on the Geotechnical Engineering Report. The plans willbuildon the topographic survey information and willshow verticalcontrolof the Project'selements, contour grading,spot elevations,and cut and fillestimates withinthe projectsite.The plans willdetailthe proposed bio-retentionareas, swales,and other drainage facilitieswithinthe Project'sdevelopment area. lil
57 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
Striping and Signage Plans
Fehr & Peers willprepare signingand stripingplans and detailsfortrailcrossingsat intersections,and, depending on the alignment and type of facility,corridorstriping.Planswillincludeexistingsigningand stripingto remain, existingsigningand stripingto be removed, and new signingand stripingto be installed.They willalso include construction detailsassociatedwith trailcrossings.The designs willbe prepared inaccordance with the Cityof Torrance requirements and the California MUTCD.
Traffic Signal Modification Plans at Torrance Blvd.
Fehr & Peers willprepare trafficsignalmodificationplans and detailsforthe Torrance Boulevard at Sartori Avenue intersection.The trafficsignalmodification planswillincludenew and/or modified signal equipment, as well as vehicleand bicycledetectionadjustments as needed to accommodate the trail crossings.The trafficsignaldesign willbe prepared in accordance with the Cityof Torrance requirements and the CaliforniaMUTCD. The trafficsignalplanswillincludesignalpoles and mast arms, vehicle detection loops,vehicleand pedestriansignals,controllercabinet assembly, and the conductor and equipment schedules.
Track Crossing Plans and Details
Where the pedestrianfacilitieswillcrossthe railroadtracks at Portola,Arlington,Cravens, and Engracia Avenues, and Torrance Blvd.,RRM's railengineer, RailPros,willprepare plans detailingtrack panel installation,track and track bed adjustments, and passive railcrossingcontrolsystems (e.g.,signsand warnings).
Electrical Plans and Details
RRM's electricalengineer, P2S, willprepare utilityservicedistributionplans,circuiting,fixtureschedules, panel schedules,and electricalcalculationsto provide electricalservicefor an overhead lightingsystem along the ClassItrailwithinthe old railROW between Crenshaw and Portola. P2S will coordinate with SCE to facilitatethe utilityapplicationprocess.
Note: Utilitycompany improvement design willbe provided by SCE. RRM's electricalengineer will endeavor to describe such work for bid purposes as itis available to us at the conclusion of the construction document process. Utilitycompany designs are subjectto SCE's review and finalapproval within theirtime frame. Construction of the utilitycompany's improvements must be obtained directly from SCE as a "handout package".
IrrigationPlans and Details
RRM willprepare irrigationplans and detailsfor a new system along the Class Itrailrunning through the old rail ROW between Crenshaw Blvd. and Portola Ave. For segment D along Sartori,RRM willprepare irrigationsystem modificationplansforareas affectedby sidewalk improvements and the introductionof new streettrees.The plans willshow tie-inlocationsto the existingirrigationsystem and layoutof the new main line,spray heads, piping,valves,and/or drip systems. In support of the irrigationplans, irrigationdetailswillbe prepared that communicate the method of construction and proper irrigation lil
58 r Torrance Active Transportation Trail
Exhibit “A” Scope of Services
system component procedures.Thisscope excludescompliance with the State's Model Water Efficient Landscape Ordinance (MWELO) sincethisprojectisconsidered a landscape maintenance project.
Planting Plans and Details
RRM willprepare plantingplans along the ClassItrailrunning through the old railROW between Crenshaw Blvd.and PortolaAve. Streettree plantingplans willbe prepared forthe parkways along Sartori.The plans willshow the layoutof planting,indicatingplantspecies,quantity,size,and locationof shrubs, ground cover, and trees.Insupport of the plantingplans,plantingdetailswillbe prepared that communicate the method of constructionand proper plantingprocedures.
Specifications
RRM willprepare technicalspecifications(formatted and based on the Greenbook Specifications).This scope assumes the Citywillprepare allgeneral provisionspecificationsectionsrelatedto thisprojectand assemble the specificationsbook.
Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65% and 90% submittal levels and then update the estimate forthe 100% submittal.The detailedConstruction Cost Opinion willbe itemized with supporting item descriptionsand unitcosts inthe Bid Form format. Due to many variables surrounding bidding and constructionconditions,thisopinion willnot representa guarantee that bids received or actualcosts of construction willbe equal to the opinion. ill
59 r
r
Torrance Active Transportation Trail
Exhibit “B” Compensation■ design
group
PA&ED (PreliminaryDesign) Phase
Task A: Pre-Design Services
Subtask A.01
Subtask A.02
Subtask A,03
KickoffMeeting and FieldWalk
AerialSurvey and Base Mapping
Vehicle, Bike,Red Counts and CollisionData Collection
Fixed-fee
Fixed-fee
Fixed-fee
$ 3,730
51,200
25,530
$
$
Task B: PreliminaryDesign Services
Subtask B.Ol
Subtask B.02
Subtask B.03
Draft Schematic Package
Community Workshop #1 - Alignment Ideas
Revised Schematic Package
Fixed-fee
Fixed-fee
Fixed-fee
Fixed-fee
Fixed-fee
Fixed-fee
Fixed-fee
$ 82,595
9,760
58,736
8,720
36,344
3,800
4,840
$
$
$Subtask B.04 Community Workshop #2 - Revised SP Presentation Subtask B.05
Subtask B.06
Subtask B.06
$FinalSchematic Package
CityCouncil Presentation- FinalSP Approval
Additional PublicMeetings
$
$
Task C: Environmental Compliance Services
CEQA Compliance Services $Subtask C.Ol Fixed-fee: 8,225 Task D: PA&ED Phase ProjectCoordination Services
Subtask D.Ol ProjectCoordination and Management
Subtask D.02 ProjectDevelopment Team (PDT) Meetings
Reimbursable Expenses
Fixed-fee:
Fixed-fee:
$ 52,040
8,830$
2,500
$ 356,850Total PA&ED Budget
PS&E (FinalDesign) Phase
Note: Tasks E and F are future services.The scope, deliverables,and budgets willbe refinedonce the project'sdesign isdeveloped through the PA&ED (preliminarydesign)process.
Task E: FinalDesign Services (PS&E)
Supplemental FieldSurvey
Subsurface UtilitySurvey
Geotechnical Investigation
Post Construction Stormwater Management Plan
65% Draft Construction Documents
90% Draft Construction Documents
100% Draft Construction Documents
Bid-Ready Construction Documents
$Subtask E.Ol
Subtask E.02
Subtask E.03
Subtask E.04
Subtask E.05
Subtask E.06
Subtask E.07
Subtask E.08
estimated fee
estimated fee
estimated fee
estimated fee
estimated fee
estimated fee
estimated fee
estimated fee
54,670
11,880
17,160
17,400
152,912
152,912
76,456
38,228
$
$
$
$
$
$
$
III
RRM Design Group reating Environments People Enjoy
San LuisObisoc iSan Leandro ]Santa Barbara |Ventura | San Juan Capisfano |San Diego | Seattle Robert Cainacho, PB 7659? . Steven Webster LS 7561 . jeffreyFerber, LA 2844 WWW. rrrTig es Ia n -c o m
3 California cor ■atfon • Leonard Grant. Architect C26^r 60 r Torrance Active Transportation Trail
Exhibit “B” Compensation
Task F:PS&E Phase ProjectCoordination Services
ProjectCoordination and Management
ProjectDevelopment Team (PDT) Meetings
UtilityCoordination
GO 88-B Processingand CPUC/UPRR Coordination
QA/QC Review
$estimated fee
estimated fee
estimated fee
estimated fee
estimated fee
45,960
12,280
4,520
79,778
14,640
Subtask F.Ol
Subtask F.02
Subtask F.03
Subtask F.04
Subtask F.05
$
$
s
$
1Reimbursable Expenses
Total Estimated PS&E Services
estimated fee 2,500
$ 681,296
Notes:
Fixed-feetasks willbe billedas the work progresses untilthey are completed, and the totalamount stated in the contractfor the task isinvoiced.
Estimated fee tasks willbe refined once the project'sdesign is developed through the PA&ED (preliminarydesign)process.
RRM reservesthe rightto adjusthourly rateson an annual basis.
Reimbursable expenses include such things as document reproduction, plotting services,public meeting materials,company car mileage (currentfederal rate),per diem for survey crew, and overnight delivery.Reimbursable expenses willbe billedas incurredat costplus 10%.
1. 2.
3. 4.
m
61 Uun '26 Jun '27Mar’27
8 il5 22.29]6 13:20;27i3j,10,17;24i3li7 14 21[28,7,11421 28!4 1118125 2 9 16 23 30 6 13i20 2 Jan '27 Feb '27 Apr'27 May '27Finish '26 Aug.'26
Ipi17:24i31l7]l4 21128; 5::,12i19:26;219 :16[23;3pi8 [13i20.27L4,11 ;18i25: 1 Jul '26 Sep '26 Oct '26 Nov'26 Pec '26ID Task Name Duration Start 1 PAED & PS&E Duration
Pre-Design
Contract Received - Notice to Proceed Issued
ProjectSet Up & Sub Agreements
Conduct Kickoff Meeting & Field Walk
Conduct Aerial Survey and Generate Topography
Conduct Vehicle. Bike. Pedestrian Counts
Collect Collision Data
220 days
30 days
0 days
5 days
0 days
25 days
IS days
5 days
Mon 5/25/26
Mon 5/25/26
Mon 5/25/26
Mon 5/25/26
Wed 6/3/26
Mon 6/1/26
Mon 6/15/26
Mon 6/29/26
Fri 3/26/27 i '
Fri 7/3/26
Mon 5/25/26 5/25-^ Contract Received - Notice to Proceed Issued iK^rojectSetUp&SubAgreements^ 6/3IVConductKickoffMeeting& FieldWalk 2 3
Fri 5/29/26
Wed 6/3/26;
Fri 7/3/26
Fri 7/3/26
Fri 7/3/26
5 ,Conduct AerialSurvey and Generate Topography
[Conduct Vehicle, Bike, Pedestrian Counts
Mi Collect CollisionData
7 9
10 Preliminary Design
Prepare Draft Schematic Package
Conduct CPUC VirtualDiagnostic
Host Community Workshop #1 - Alignment Ideas
Prepare Revised Schematic Package
Prepare Cost Estimate
Conduct CPUC FieldDiagnostic
Most Community Workshop #2 • Revised Schematic I
Prepare Final Schematic Package
Prepare Cost Estimate
Prepare CEQA NOE Findings
Staff Report Preparation by City Staff
Present FinalSchematic Plan to City Council
Post NOE @ County of Los Angeles County Clerk
77 days
20 days
0 days
0 days
22 days
todays
Odays
Odays
12 days
5 days
5 days
todays
0 days
0 days
Mon 7/6/26
Mon 7/6/26
Tue 7/21/26
Wed 8/5/26
Thu 8/6/26
Mon 6/24/26
Wed 9/2/26
Wed 9/9/26
Thu 9/10/26
Mon 9/21/26
Mon 9/21/26
Mon 9/28/26
Tue 10/13/26
Tue 10/20/26
Tue 10/20/26
Fri 7/31/26
Tue 7/21/26
Wed 8/5/26
Fh 9/4/26
Fri 9/4/26
Wed 9/2/26
Wed 9/9/26
Fri 9/25/26
Fri 9/25/26
Fri 9/25/26
Fri 10/9/26;
Tue 10/13/26
Tue 10/20/26
[-prepare Draft Schematic Package
7/21^ Conduct CPUC VirtualDiagnostic
8/5^ HostCommunityWorkshop#1 -AlignmentIdeas
Prepare Revised Schematic Package
Prepare Cost Estimate
9/2^ Conduct CPUC Field Diagnostic
9/9^ HostCommunityWorkshop #2 -RevisedSchematicPlan
Prepare Final Schematic Package
^ Prepare Cost Estimate
Mi Prepare CEQA NOE Findings
Staff Report Preparation by City Staff
10/13'^PresentFinalSchematicPlantoCityCouncil
10/20% PostNOE @ CountyofLosAngelesCountyClerk
11 12
13 ii14
15 16
17 18
19 20
21 22
23 24
25 Final Design
Conduct Supplemental Survey
Conduct Subsurface UtilitySurvey
Perform Geotechnical Investigation
Prepare 65% Draft Construction Documents
Perform QA/QC Review
Prepare Cost Estimate
Prepare DraftStormwater Management Plan
City Plan Check of 65% CD's
Prepare 90% Draft Construction Documents
Perform QA/QC Review
Prepare Cost Estimate
Prepare Final Stormwater Management Plan
City Plan Check of 90% CD's
Prepare 100% Draft Constmction Documents
Perform Q/V/QC Review
Prepare Cost Estimate
City Back Check of 90% CD’s
Prepare Bid-Ready Construction Documents
Submit Bid Set to City
126 days
5 days
todays
15 days
30 days
5 days
10 days
15 days
todays
25 days
5 days
todays
10 days
10 days
15 days
5 days
10 days
10 days
todays
0 days
Mon 9/28/26
Mon 9/28/26
Mon 9/28/26
Mon 9/28/26
Mon 9/28/26
Mon 11/2/26
Mon 11/2/26
Mon 10/26/26
Mon 11/16/26
Mon 11/30/26
Mon 12/28/26
Mon 12/28/26
Mon 12/28/26
Mon 1/11/27
Mon 1/25/27
Mon 2/8/27
Mon 2/8/27
Mon 2/22/27
Mon 3/8/27
Mon 3/22/27
Mon 3/22/27
Fri 10/2/26
Fri 10/9/26
Fri 10/16/26
Fri 11/13/26
Fri 11/6/26
Fri 11/13/26
Fri 11/13/26
Fri 11/27/26
Fri 1/8/27
Fri 1/1/27
Fri 1/8/27
Fri 1/8/27
Fri 1/22/27
Fri 2/19/27
Fri 2/12/27
Fri 2/19/27
Fri 3/5/27
Fri 3/19/27
Mon 3/22/27
^ ConductSupplementalSurvey
Conduct Subsurface UtilitySurvey
Perform Geotechnical Investigation
M Prepare 65% DraftConstruction Documents
Mi Perform QA/QC Review
Prepare Cost Estimate
Prepare Draft Stormwater Management Plan
City Plan Check of 65% CD's
26 27
28 'fa29
30 31
32 33
,,,,M Prepare 90% DraftConstruction Documents
Mi Perform QA/QC Review
iPrepare Cost Estimate
34 35
36 37
City Plan Check of 90% CD's
,, ,M Prepare 100% Draft Construction Documents
Perform QA/QC Review
Prepare Cost Estimate
City Back Check of 90% CD's
Prepare Bid-Ready Construction Documents
3/22% SubmitBidSettoCity
38 39
40 41
42 43
44 45
220 days Mon 5/25/26
Mon 5/25/26
Wed 7/22/26
Fri 2/19/27
Mon 10/12/26
Fri 3/26/27
Fri 3/26/27
Fri 1/8/27
Fri 2/19/27
Fri 1/8/27
46 Project Coordination
Ongoing ProjectCoordination,Management. & Meetii 220 days W
Ongoing Project Coordination, Marugement47
Process GO 88-8 Permit thru CPUC
2/19% GO 8B-BPermitsIssued
Process GO 88-B Permit thru CPUC
GO 88-B Permits Issued
UtilityCoordination
123 days
0 days
65 days
49 Ifa UtilityCoordination50
ProgressProject: Torrance ATP
Date: Thu 4/9/26
Milestone ♦ SummaryDesign Team Activity Agency Activity
62 EXHIBIT B
PROPOSAL
[To be attached]
63 Cityof Torrance
PreliminaryDesign and Environmental Analysisof Multi-UseActiveTransportationTrailProject(62025-24).biddingon 12/04/2025 5:00 PM (PST)
Printed 12/05/2025
Bid Results
Bidder Details
Vendor Name
Address
RRM Design Group
3765 S.Higuera StSte, 102
San LuisObispo, California93401
United States
Brian Hannegan
Project Manager
949-325-0629
bahannegan(a)rrmdesign.corn
Respondee
Respondee Title
Phone
Email
Vendor Type
License #
CADIR
Bid Detail
Bid Format Electronic
Submitted 12/04/2025 12:15 PM (PST)
DeliveryMethod PDF vialportal
Bid Responsive
Bid Status Submitted
Confirmation# 459520
Ranking 0
Respondee Comment
Thank you in advance for the opportunity to submit our proposal! Buyer Comment
Attachments
File Title
RFP No. B202S-24 Torrance Multi-Use Active Trans Trail
ProJect.pdf
File Name
RFP No. B2025-24 Torrance Multi-Use Active Trans Trail
ProJect.pdf
FileType
Response
File
PlanetBids
64 'C,
I.
s
RFP No. B2025-24-Proposal Submitted to City of Torrance on December 4, 2025 V-
.:j
J .■» I “
m
V'.rr*
-
Environment^JVna^sisll^fMultiuse Aetive^^
ii-3
V .C; V-'.. ,ak«£—1■T^ -
%i- *..-—
r
rrm
&S design ^
group■s fHW i
i
^1
i-
:'i-r*-:-
rtfava eA
65 Re: MultiuseActive TransportationTrailProjectr
.(Tgdesign
1113™“"
Dear SallyKyung and Selection Committee,
The Vision
The CityofTorrancehas longdemonstrated visionaryleadershipand an unwavering commitment to itsresidentsby investingin projectsthat enhance mobility,safety,and connectivity.Buildingon thistradition,the Torrance Multiuse Active TransportationProjectrepresentsa bold step toward creatingnew and secure mobilityoptions between the Mary K.Giordano Regional TransitCenter and the historic Downtown Torrance core. This initiativereflectsthe City'sdedication to fosteringwalkability,improvingfirst-and last-mileconnections,and delivering a corridorthatstrengthenscommunity ties.At RRM Design Group, we share thisvisionand are prepared to bringa thoughtful,collaborativeapproach that transforms these goals intoa seamless, intuitive,and vibrantactivetransportation Creating
Environments
People
Enjoy*
December 4, 2025
SallyKyung
Cityof Torrance
3031 Torrance Blvd
Torrance, CA 90503
RRM Design Group
32332 Camino Capistrano,
Ste 205
San Juan Capistrano, CA
92675
p: (949) 361-7950
WWW. rrm design .com
link.
Our Approach
RRM Design Group has been closelyengaged with thiscorridorfrom the City's earliesteffortsto explore itspotential.We have already completed several sitevisitsand a preliminaryfieldassessment to understand the corridor's unique physicalconditionsand operationalconstraints.These efforts included measuring right-of-waywidths,reviewingsidewalksand parkways, analyzingstreet intersections,documenting the railalignment,and evaluatingthe surrounding one way streetsystem—providing a strong foundation foran efficient and informed project start.
Buildingon thisgroundwork, our team has developed a conceptual corridor overview (check out Section 2)that reflectsmonths of iterativeplanning, collaborativesessions,and on-the-ground evaluations.We have broken the alignment intologicalsegments, explored strategiesfor connecting Downtown Torrance and the TransitCenter, and refined ideas through fieldchecks to ensure feasibilityand community benefit.Our approach prioritizessafety,intuitive design,and environmental clearance considerationswhile creatinga corridor that seamlessly linksadjacent neighborhoods and enhances the City'sactive transportation network.
Our Team
As the Prime Consultant,RRM DesignGroup brings50 years of Active Transportation,planning,design,and engineering experience to lead thisproject (check out Section 3).Our multidisciplineteam isin-house and isled by Mike Sherrod,MobilityGroup Leader who willserveas a principalin charge. Brian Hannegan, Manager of Landscape Architecturewillserve as project manager, main pointof contact,and complete streetscapespecialist.
66 We are primed to cover projectmanagement, activetransportationplanning,alignment design,civiland structuralengineering,landscape architecture,CEQA clearance,and publicengagement.
To complement our in-house team, we have assembled a trustedteam of subconsultantswith deep experience in multimodal corridordesign and rail-adjacentinfrastructure:
Fehr & Peers - Trafficengineeringand signalmodifications RailPros- CPUC/UPRR permittingcoordination
Guida - Topographic and utilitymapping
P2S - Corridorlightingdesign
GPI - Geotechnicalengineeringand percolationtesting
OCMI - Cost analysisand estimating
Avant Garde - Grant research and funding strategies
Ready to Serve
The Torrance Multiuse ActiveTransportationProjectisan excitingopportunity to advance the City's long-term visionfor mobility,safety,and downtown vitality.With our establishedpartnershipwith the City and our team's technicaldepth, RRM Design Group isready to delivera corridorthat isintuitive,connected, and transformativeforthe community.
On the followingpages, we have endeavored to layout a clearunderstanding of the project'scontext,corridor design approach, and skillmix we bring.We have backstopped thisapproach with a solidteam of professionals wellversed inallaspects of activetransportationplanningand design.We have alsodeveloped a clearand cogent work plan foryou, articulatingeach step and setof deliverablesrequiredto deliverthisnew mobility infrastructureto the community.
We look forward to collaboratingwith Citystaff,stakeholders,and residentsto bringthisprojectto life.Inthe end, our goal isto work as an extension of you and your staff,applyingour team's talentwhere itwillbe most effective.Thank you forconsideringus as part of your team.
Sincerely,
RRM Design Group
Brian Hannegan, ASIA, PLA
ProjectManager, Main Pointof Contact
(949)325-0629
[email protected]
Mike Sherrod, ASIA, PLA, LEED AP
Managing Partner
MobilityGroup
67 RFP No. B2025-24
Proposal
For
PreliminaryDesign and EnvironmentalAnalysisof
MultiuseActive TransportationTrailProject
Table of Contents
Section 1: Preface
Section 2; Project Understanding & Work Plan...
Section 3: Qualifications (Background Information)
Section 4: Bill Rates
Section 5: Project Schedule
Section 6: Appendix
.1
n
33 53
61 64
Please Note: Per Addendum #2, dated November 24, 2025, In compliance with the Qualifications-Based Selection (QBS) California statute.Government Code §4525, the Cost Proposal issubmitted in a separate, secured file,viaemail to SallyKyung (skyung@torranc eca.gov).
Graphics & Photographs;
Thisdocument features images ofRRM Design Group and itssubconsultantpartners'projects,the graphicsand photos of which are owned, copyrighted,and/or licensedby our respectivefirms.Some images may be modifieddue toprivacyconcerns.
About RRM Design Group:
32332 Camino Capistrano,Ste 205 • San Juan Capistrano,CA 92675 • Headquarters: 3765 South Higuera St,Ste 102 • San LuisObispo, CA 93401 • (805)543-1794 • rrmdesign.com • A Californiacorporation • Leonard Grant, Architect C26973 • Robert Camacho, PE 76597 • Steven Webste,r LS 7561 • JeffFerbe,rPLA 2844
The writtenand graphic materialscontained inthisproposal are the exclusivepropertyof RRM Design Group. The unauthorized use of any portionof these textor graphic materialswithout RRM's priorwrittenconsent isexpresslyprohibited.©2025 RRM Design Group 68 Jr ^'< ^
f •k
69 1
Section One:
fit'
^ tm.-n
k
Pictured: Hermosa Beach Pier Avenue
Street Improvements, Hermosa Beach, CA
m gS9>
V
• X
1 70
RFP for Preliminary Design and Environmental Analysis of Multi-Use Active Transportation TrailProject
RFP No. B2025-24
SECTION III PROPOSAL SUBMITTAL
FAILURE TO COMPLETE ALL ITEMS IN THIS SECTION MAY INVALIDATE PROPOSAL.
Inaccordance withyour "Request forProposals (RFP)",the followingproposalissubmittedtothe City of Torrance.
RFP Submitted By:
RRM Design Group
Name of Company
San Juan Capistrano32332 Camino Capistrano, Ste 205 92675 Street Address City Zip Code
(949)347-5587 N/A
Telephone Number Fax Number
Mike Sherrod, Managing Partner [email protected] Printed Name/Title E-Mail Address
December 4, 2025
Signature Date
Form of Business Organization: Please indicatethe following(check one). [3 Corporation□ Partnership□ SoleProprietorship□ Other:
Do you have a Parent Company? [x] No □ Yes,
Do you have any Subsidiaries? [X] No □ Yes,
(Name of Parent Company)
(Name of SubsidiaryCompany)
Business History:
Years in business under your currentname and form of business organization? Iflessthan three (3)years and your company was inbusiness under a differentname, what was that name?
50 Years
N/A
Contact for Additional Information:
Please provide the name of the individualat your company to contact forany additionalinformation:
Mike Sherrod Managing Partner
Printed Name Title
[email protected](949) 347-5587
Telephone E-Mail Address
11 lil Section1 Preface\ ProposalForMultiuseActiveTransportationTrailProject 2 71 Proposal S ubmittal Icontinued),
; RRM Design GroupV Ne n d o r a m e
: (P )PA R is mandatory to complete this section
information you have received regarding this
(per instructions),you are stillheld accountable to its contents. d d e n d a e c e i V e d lease indicate addenda
RFP. If addenda is not attached to your bid submittal
Date RAd d e No Ad No. Date Rn d u m e c ei V e d d e n d u m e c e iV e d October 13, 2025#1 2 November 24, 2025
October 28, 20251
□ No Ad RFP,denda received regarding this
P aymentT The City T Paymentterms are Net 30. Th e Cof ity does not make pre'e r m s . orra nee payments, or pay upon receipt,
Do you offer any discounted invoice terms?
s cp ta rt and o m p 1 eti o n ,r oj e ct
The C ity requires the projeetto start as soon as possible from the aw/ard of a contract and the project S p e cificcompleted as soon as possible periods that are mutually agreed upon will be established ubregional F unding
se offunding requires expending F unds granted for allowable costs within three A M Muiti-Y safter award of a contract s outlined within the e a s u r e ear A groement, timely
36 July 1 of th e
FY 2022-23
Fi Y F All Fmonths fro seal ear in which unds are programmed. undsyears or J 30, 2025programmed for are subject to lapse by u n e
Pr oJe ct a n a g e r ,
Pie P roje ct Mase provide the name ofthe individual at your company who will serve as a n a g e r for this c o ntr a ct
Brian Hannegan Project Manager
N T itie
[email protected]
a m e
N/A(949)325-0629
T Fax NN E Ae Ie p h o n e umber um ber mail d d r e s s 12 III Section1 |Preface| ProposalForMultiuseActiveTransportation TrailProject 3 72 ; RRM Design GroupNV e n d o r a m e
S u b C ontractors.
RFP?f awarded, will you bo using sub con tr actors to carry outtho scope ofwork required in this es, we will bo using sub contractors and have listed their contact information below. □ No , we will not be using any sub con tr actors for this project.
See page 36 See page 36 See page 36
C CN N To nta ct iti eo m p a n y a m e a m e
See page 36See page 36
T N Fa. N E Ae Ic p h o n e umber umber d d r e s s
Please explain the working relationship between your company and the sub contractor.
The working relationshipbetween RRM Design Group & our trusted subconsultants isdefined in our cover letter.
lil Preface| ProposalForMultiuseActiveTransportationTrailProject 4Section 1 73 Pro p o sa Is u b m itt a I continued).
. RRM Design GroupV Ne n d o r a m e .
B R Experience with Similar Packground and e c e n t rejects .
In the space below, please provide a narrative explaining your background and recent experience with similar projects as the scope of work identified in this RFP, (P )lease attach additional sheet if needed.
InSection 3, beginning on page 33 through page 51,we describeour firmbackground,identifyour key team. our team's core competencies, and relevantprojectexperience. 14 III Section1 IPreface\ ProposalForMultiuseActiveTransportation TrailProject 5 74 Proposal Submittal (continued)!
RRM Design GroupNV e n d o r a m e
w Plan fo r E R Te q u ir e d ask!o r k a c h
In the space below, please describe in detail the methodology you will be utilizing to conductfor each (Ptask. lease attach additional sheets if needed.
InSection 1, beginning on page 11,we illustrateand defineour projectunderstandingand work planofthis project.
In the same Section 2, beginning on page 17,we describe our work plan in detail. 15 lil Section1 IPreface| ProposalForMultiuseActiveTransportation TrailProject 6 75 Su b m ittaI(Pro p o sa I continued;,
. RRM Design GroupV Ne n d o r a m e .
R eferences
Please suppiythe names of co /panies/agencies for which you recently supplied comparable references is required] additional/ RFP, A minim u (3)g o o d s/s ervic e s as requested in this of three , References from public agencies are preferred. DO HOt inClUdO ttlGCity Ofreferences are optional Torrance as a reference for this RFP.
N C /A WhittierGreenway & TrailEast,Cityof Whittiera m e of o m p a n y g G n c y .
S A 13230 Penn Streetd d re s s ,tre et
City: Whittier, CA 90602
S , Zip c ode.tate
P roduct/SWh Please see Section 3, page 41 foralldetails.ervice did youat C /A ?1 provide to this o m p a n y g e n cy :
N Person to C Nancy Mendez, RetiredAssistantCity Manager a m e of o nta ct,
Phone N C (562) 458-4222umber of o nta ct
E A C Email: [email protected] of o nta ct.
N C /A Escondido Creek TrailExpansion and Renovation Designa m e of o m p a n y g e n c y .
S A 201 North Broadway City Hall,2nd Floorddress.tre et City, S Zip c Escondido, CA 92026ode,tate
W Prod u ct/S Please see Section 3, page 45 foralldetails. hat ervice did you
C /A 7provide to this o m p a n y g e n c y :
2 N P C Joanna Axlerod, Deputy City Manager
a m G of erson to o nta ct.
Phone N c (760) 839-4573
umber of o nta ct.
Email A C Email:[email protected]
ddress of o nta ct.
ruz RailTrailSegments 7
(& County) of Santa Cruz
10-1, CitycN /Aa m G of o m p a n y g e n cy,
S A 809 Center Streetddress.tr e et
City, S Zip c Santa Cruz, CA 95060tate ode.
W P roduct/S Please see Section 3, page 46 foralldetails. h at ervice did you
c /A 7provide to this o m p a n y g e n c y :
3 N P Ca m e of
Nathan Nguyen, Director of Public Works
erson to o nta ct.
Phone N c (831)420-5188
umber of o nta ct.
Email:[email protected] A Cddress of o nta ct. 16 III Section1 Preface\ ProposalForMultiuseActiveTransportationTrailProject 7 76 Proposal S ubmittal (continued
; RRM Design GroupV Ne n d o r a m e
RFP S u b m ittaIReg Ac knowl e d guirement and e m e nt Vendors are required to answer each of the questions listed below, Y you have provided this information in your proposal submittal. Y ou mustindicate belowthat
must attach additional sheetso u
RFP s u b m itta! describing in detail the service you are proposingto your RFPS Work Q Icope of u o sti o n s ndicate what page in your proposal you have
answered this q e sti o n ,
0 Yes □ NoDi F orm with yourAffi RFPS 7d you include a signed davit u b m itta I ! D Bid you attach additional sheets to answer the
Projects information o
ackground and
0 Yes □ NoR ecent Experience with Sii m i I a r ofpage
RFP? Startingon
Pace 33
Section 3
this
of our submittal
0 Yes □ NoD Tid you complete a project proposal as described in the e c h n ic a I R 7e q u ire m e nts :
0 Yes □ NoD City?id you review all addenda, if any, issued by the 0 Yes □ NoDi (3)d you nclude resumes of no more than three q u a lifie d 7 Startingon
candidates
Section 3
P 21 of our submittal.age
Section 3
0 Yes □ NoD Ref e 7id you include re n c e s
Priorpage
Page0_
Section 1
of our submittal
0 Yes □ NoA (Non-PWage R 7re V a illn gate s n c I u d e dre your Startingon
Page of our submittal,
III Section1 |Preface\ ProposalForMultiuseActiveTransportation TrailProject 77 ATTACHMENT 1
STATE OF CALIFORNIA
PROPOSER'S AFFIDAVIT
COUNTY OF LOS ANGELES
Mike Sherrod, ASLA, PLA, LEED AP being first duly sworn deposes and says!
1. That ho/she isthe Managing Partner RRM Design Groupof (T O ) (N C )itie of ffi c e a m e of o m p a n y
H City of Torrance a proposal forereinafter called proposer , who has submitted to the PreliminaryDesign and Environmental Analysisof Multiuse Active TransportationTrailProject RFP)(Titie of
2, T hatthe proposal is genuine, that all statements of fact n the proposal are true, 3, T hatthe proposal was not made in the interest or behalf of any person, partnership, company, association, organization or corporation not named or disclosed!
4. T Proposer did not, directlyor indirectly, induce solicit or agree with anyone else to submit a false or sham proposal, to refrain from proposing, orto withdraw his proposal, to raise or fix the proposal price ofthe Proposer or of anyone else, orto raise orfix any overhead, pro fitor cost element ofthe P price of anyone else, and did not attemptto induce action prejudicialto the interest ofthe City ofT Proposer, or anyone else
hat the
roposers price ortho
orrance, or
of any oth or nterested in the proposed contract!
5, Th atthe Proposer has not in any other manner sought by collusion to secure for itself an advantage over Proposerorto induce action prejudicialtothc interests ofthe Proposer or of anyone else interested in the proposed contract, c Tth e oth or ity of orrance, or of any other
6. T hatthe Proposer has not accepted any proposal from any subcon tractor or materialman through any proposal depository, the bylaws, rules orregulations of which prohibitor prevent the Proposer from considering any proposal from any subcon tr actor or material man, which is not processed through that proposal depository. or which prevent any subcontractor or materialman fro proposing to any contractor who does not use the facilities of or accept proposals from or through such proposal depository! 7, T hatthe Proposer did not, directlyor ndirectly,submitthe P roposer s proposal price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership. company, association, organization, proposal depository, orto any member or a g o nt th e r e of, orto any individual or group of individuals, excepttothe City of T Proposer in itsbusiness.
orrance, orto any person or persons who have a
partnership or other financial interest with said
8. Th Proposer has not been debarred from participation s tate or F ederai works project.atthe any December 20 25Dated this ^ d a y of
(P Si )roposer g n ature
Managing Partner
(Title)
21 lii Section1 jPreface| ProposalForMultiuseActiveTransportation TrailProject 9 78 J
79 <
t
I
♦
Section Two:
Project Understanding & Work Plan
Pictured: Santa Cruz Rail Trail,Santa Cruz, CA
t :i?
t
11- '
*
¥
•j
1 80
Project Approach
Corridor Overview
The followingsegment breakdown of the multi-modal
activetransportationtrailwas derived from our
team's evaluationof the projectarea over the past
years.
P- TORRANCE MULTIUSE ACTIVE TRANSPORTATION TRAIL CORRIDOR SEGMENT ANALYSIS rrm
Itstarted with RRM's planning team studying
development scenarios,mobilitygaps,and
infrastructureneeds—creating space to explore
strategiesforconnecting Downtown Torrance and
the Torrance Transit Center. Over the months since
the initialRFP release in October 2024, thiswork
intensified.Earlysitereviews with key team members
laidthe groundwork, and severalwalks between
the TransitCenter and Downtown helped evaluate
alignment options and implementation strategies.
In the lead-up to thiscurrent RFP,collaborative
sessionsaround the tablefocused on solvingproject
challenges,sketchingconcepts,and breakingthe
corridorintologicalsegments. Soon, the firstgraphic
conceptualizationof the trailalignment and itskey
featuresbegan to take shape. Ideaswere layeredand
refinedthrough iterativefieldchecks, leadingto a
sophisticatedunderstanding of significantelements,
environmental clearance considerations,and an
implementation approach.
These visitsprovided firsthandinsightintohow the
corridorfunctionswithinthe Cityright-of-wayand
informed strategiesforseamlesslylinkingadjacent
neighborhoods along the one-mile stretch—from the
Torrance Transit Center to the south-side intersection
of Sartori Avenue and Torrance Boulevard. The
conceptual corridoroverview offersa glimpse into
thishigher-levelthinking,and ifyou flipthe page,
you'llsee how on-the-ground thinkingisshaping up
foreach corridorsegment and how the community
connection comes to life.
uownrown lorrance
Torrance Blvd
SEGMENT ESEGMENT B SEGMENT C SEGMENT D SCRAMBLEROAD Dtrr ABANDON RAIL CORRIDOR COMPLETE STREET INTERSECTION Sartori Avenue370 LF 2.100 Lf 250 LfAaivf Rail Line
1.600 LF
III Section2 [ProjectUnderstanding& WorkPlan\ Proposal For Multiuse Active Transportation TrailProject 12 81 Segment A - TransitLinkITorrance
TransitCenter to Dominguez Street
ExistingCrenshaw Blvd. looking towards Dominguez St. Proposed The Crenshaw Boulevard connection to the Torrance
TransitCenter presents a strong opportunity fora
clearClassImultiusecorridoralong the east sideof
Crenshaw, requiringonly minor modificationsto the
existing10-foot-widesidewalk.By reconfiguringthis
portion of the right-of-wayintoa Class Imultiuse,
a seamless connection can be established from the
existingpedestrian crosswalk at the TransitCenter
entrance south to the Dominguez Streetintersection—
an alignment of approximately450 linearfeet.
Thissegment offersthe potentialto preserve the
existingparkway treeson Crenshaw while incorporating
additionaltrees,pedestrian-scalelighting,and enhanced
understory plantingwithinthe right-of-wayto createa
safer,more comfortable,and attractiveuserexperience.
Segment B - Road Diet |
Dominguez Street
Th extensionof the proposed ClassImultiuse alongthe
north sideof Dominguez Street,beginningat the Crenshaw
intersection,could be achieved through a road diet
approach for the first370 linearfeet from the Crenshaw
and Dominguez intersection.Dominguez Streetis40
feet wide from curb to curb, carrieslow trafficvolumes, and rarelyhas vehiclesparked along the existingcurb.
This providesan opportunity to shiftthe north curb line outward by approximately 8 to 10 feet to accommodate
a ClassIfacilityand maintain two IT wide travellanes.
This adjustment would allow the multiuse trailand a
continuous row of parkway treesto extend along the
streetedge forthe full350 feet,leadingseamlesslyinto
the wider abandoned railcorridorsegment beyond.
ExistingDominguez St. looking east Proposed
III Section2 j ProjectUnderstanding& WorkPlan\ Proposal For Multiuse Active Transportation TrailProject 13 82 Segment C - Abandoned RailCorridor|
Dominguez Street
he ClassImultiusetrailwould continueeastalongthe abandoned railright- of-way.With thewidercorridoravailable,thissegmentoffersthe opportunity to incorporatenativeand drought-tolerantplantingto createa greenway-like enhancement.The trailcouldgentlymeander throughthe corridor,providing connectionsto the perpendicularneighborhood streetsand sidewalksat Acacia, Madrid,Amapola, and Cota Avenues.Ultimately,thetrailwould extend eastward to connectwithSartoriAvenue right-of-wayand Dominguez Way, completing a continuousand accessiblemultiuselinkthroughthe neighborhood.Other future neighborhood enhancements could includeoutdoor fitnessstations and other parkfacilitiesto enhance thisopportunityforurban open space.
ExistingAbandoned RailCorridorlookingtowards Crenshaw Proposed Segment D - Complete StreetjSartoriAvenue
to Torrance Boulevard
Segment D - Complete Street Options
Thissegment ofthe trailtransitionsfrom the open abandoned railcorridor to the SartoriAvenue right-of-way.The optionto continuea Class Imultiuse trail on Sartoricouldconsiderwideningthe existingsidewalkand parkway zone severalfeetto incorporatethe ClassImulitusetrailwhilemaintainingthe parallel parkingallwithinthe Cityright-of-way(ROW). Modificationsto existingprivate encroachment intothe CityROW willneed to be addressedalongthissegment.
The example showing thisClassIscenarioincludesthe parkway as a buffer between the parallelparkingzone.Anotherway to incorporategreenstreet elementswould includetreeplatersalongthe parkingzone every 44' to allow forstreetbeautification,shade,maintainon-streetparking,and allowforstorm water treatment. The tree lined street and Class Imulituse trailwillfurther strengthenthe visualestheticsthatthisisa primarygreenway path.
There arefourat-graderailcrossingswithinatthemedian,each currentlysigned but not signalized.Thisraillineislightlyused,witha trainarrivingabout once per week at low speed to deliverrailcarsto the UnitedStatesGypsum plantlocated roughly1,200linearfeetnorthofthe signalizedcrossingat Dominguez Street.
At present,thereare no formalpedestriancrossingsat the Sartori Avenue median intersections within this corridor. RRM's raildesignpartnersRailPros expertson railcrossingsand CPUC coordinationwillas partof the project, evaluatethe fourat-graderailcrossingsto incorporateappropriatesignage, warning devices,and accessiblerailtrackcrossingof Sartori Avenue. Each crossingmust safelyaccommodate ADA accessibility,pedestriansand bicyclists travelingperpendicularto SartoriAvenue at Portola,Arlington,Cravens,and Engracia.The crossingupdates willincludenew concretesidewalks,ramps and warning tiles,modifiedcurb edges and crosswalkstripingacross the intersection.
Ill Section2 |PfoiectUnderstanding& WorkPlan1 Proposal For Multiuse Active Transportation TrailProject 83 Segment E - Scramble Intersection|SartoriAvenue and Torrance Boulevard
Torrance Boulevard and the Sartori Street intersection are key locationsto begin to calm traffic and designatethisarea of town as a gateway to the City.The largeintersectionat SartoriAvenue and Torrance Boulevard presentsa challenge
for maintainingcontinuityof the sidewalk,
bikefacilityimprovements and a possible
ClassImultiusetrailalong Sartori.Currently,
the intersectionoperates with a single
sided pedestrian crossing,and the railtracks
curve eastward through the intersection
along the south sideof Torrance Boulevard.
There may be an opportunity to explore a
scramble intersection,which could provide
saferand more efficientcrossingsfor both
pedestriansand bicyclists,improving access
to the new trailand enhancing the connection
to downtown gateway. These gateway
improvements help to calm traffic,designate
key entry points inthe city,and provide a
purposefullydesigned sense of place forthe
community.
ancfr St
Work Plan for Success
With 5 Decades of Active Transportation experience and 12 months of thought and fieldwork on thiscorridor...RRM has an action plan for Torrance...
The legwork paid off!As you can tellfrom the projectmap breaking down the corridorintologicalsegments, and clear-eyedassessment of the challengesand potentialsolutionsforeach segment, we have a deep understanding of the assignment infrontof our team. Our understanding of thistrailcorridor,coupled with our extensive experience designing Active Transportation projectsalong active raillines,abandoned rail corridors,busy streets,and through quiet neighborhoods, has framed out thinkingof how to best serve the Cityand community to connect Downtown Torrance and the RTC.
Specifically,we are proposing a work plan and scope of servicesthatwillmove your projectsmoothly along from preliminarydesign through environmental clearance and intofinaldesignsettingthe projectup for construction.The scope of work presented inthe RFP was inspiringand laidout the generaloutlineof what the Cityislookingfor.Using the RPF'sscope as the startingpoint,we tapped intoour experience of successfullydeliveringthistype of projectto the communities we serve and evolved itinto a detailed scope of servicesto move the projectalong inan efficientmanner.
Please take some time to read through the proposed scope of servicespresented on the followingpages.We hope thispiques your interestto dig in deeper and discuss this further with our team. ill Section2 ProjectUnderstanding& Work Plan \ ProposalForMultiuseActive Transportation TrailProject 15 84 I.Scope of Services Task Outline
Task A: Pre-Design Services (PAED)
KickoffMeeting and FieldWalk
AerialSurvey and Base Mapping
Vehicle, Bike, Pedestrian Counts and
Collision Data Collection
Subtask D,04; Post Construction Stormwater
Management Plan
65% Draft Construction Documents
90% Draft Construction Documents
100% Draft Construction
Documents
Bid-Ready Construction Documents
Subtask A.01
Subtask D.05Subtask A.02
Subtask A.03 Subtask D.06
Subtask D.07
Subtask D.08:
Task B: Preliminary Design Services (PAED)
DraftSchematic Package
Community Workshop #1 -
Alignment Ideas
Revised Schematic Package
Community Workshop #2 - Revised
Schematic Plan Presentation
FinalSchematic Package
CityCouncil Presentation- Final
Schematic Package Approval
Task C: CEQA Compliance Services ( PAED)
Notice of Exemption
Subtask B.Ol:
Subtask B,02: Task E:ProjectCoordination Services(PAED/PS&E) ProjectCoordination and
Management
ProjectDevelopment Team (PDT)
Meetings
UtilityCoordination
GO 88-B Processingand CPUC/UPRR
Coordination
QA/QC Review
Subtask E.Ol:
Subtask B.03:
Subtask B.04: Subtask E.02:
Subtask E.03:Subtask B.05:
Subtask E.04:Subtask B.06:
Subtask E.05:
Subtask C.Ol:
Task F:Optional Services
Subtask F.Ol:
Subtask F.02:
Task D: FinalDesign Services (PS&E)
Supplemental FieldSurvey
Subsurface UtilitySurvey
Geotechnical Investigation
Project Funding Research
Additional PublicMeetings (2 PC and
ICC)
New TrafficSignalDesign at
Crenshaw and Dominguez
Subtask D.Ol
Subtask D.02
Subtask F,03:Subtask D.03
t
% /
x-
(
A
1 i
V
4!
85 II.Detailed Scope of Services
Task A: Pre-Design Services (PAED)
Subtask A.01: Kickoff Meeting and Field Walk
To initiatethe design process and get the projectrolling,RRM's team willconduct a kick-offmeeting with the projectteam. Principally,thismeeting willprovide an opportunityto confirm the schedules'key milestones.
This meeting willalso provide a forum to discussthe datawe've collectedthusfar,identifyany outstanding data needs,and setdatesforupcoming meetings and open house.
Followingthe kick-offmeeting, RRM and the projectteam willwalk the alignment to confirm the multi-modal activetransportationtrailalignment ingeneral and explore the sectionbetween Downtown Torrance and the RTC ingreaterdetail.The objectiveof thisfieldwalk isto evaluatesiteconstraints,discusspros and cons for potentialalternativealignment options,and look forthe most feasiblesolutionsto implement Complete Street and multiuse trailstrategies.
Deliverables:
• Prepare forand conduct one (1)kickoffmeeting.
• Prepare forand conduct one (1)fieldwalk.
• Meeting and fieldwalk notes.
Subtask A.02: Aerial Survey and Base Mapping
RRM's surveyor,Guida GeospatialSolutions(Guida),willconduct survey work withinthe projectarea to create a base map filesuitablefordesign work. The survey scope willincludethe followingcomponents:
AerialTopographic Mapping
• Establishsurvey control referenced to the NAD83 CaliforniaCoordinate System, Zone 5 horizontaldatum by tiesto CSRC Continuous GPS stationsand to the NAVD88 datum by tiesto availableCityof Torrance benchmarks.
• Prepare ProjectControl Map with detaileddatum notes,coordinate listing,and an accuracy statement. • Set aerialmapping targetsas directed by our aerialmapping subconsultant. • Coordinate with aerialmapping subconsuitantto obtain coloraerialphotography.Topographic mapping willbe compiled at a scaleof 1-inchequals 20 feet using standard photogrammetric methods as an AutoCAD/CiviBD drawing filewith DigitalTerrainsurfaceModel (DTM). • Aerialmapping subconsultant willproduce an ortho-rectifiedimage usingstandard photogrammetric methods as a georeferenced TIF file.
Right of Way Mapping
• Download latestGIS parceldata from Los Angeles County websites. • identifyfivesignificantproperty corners along the length of the projectthat can be used to confirm and adjust the GIS landnet mapping.
• Research record maps to selectthe fivecorners where a survey monument exists.Perform fieldsurvey to tiethe fivemonuments intothe projectcontrolsystem.
• Overlay GIS landnet mapping and the fivemonuments and adjustthe GIS mapping to the projectcontrol system.
• Prepare AutoCAD drawing with assessor parceland streetright-of-waylinework.The limitsof the landnet mapping willcorrespond with the aerialtopographic mapping. iil Section2 |ProjectUnderstanding& WorkPlan\ Proposal For MultiuseActive TransportationTrailProject 17 86 Deliverables:
• Digitaltopographic map fileinAutoCAD format.
• DigitalTerrainModel.
• Color digitalorthophotos.
Subtask A.03: Vehicle, Bike, Pedestrian Counts and Collision Data Collection RRM's trafficengineer,Fehr & Peers,willcollectvehicle,bicycle,and pedestriancounts at three locations between the RTC and Downtown Torranceto assessexistingactivitylevelsand localcirculationpatterns.The locations are:
• Dominguez Streeteast of Crenshaw Boulevard
• SartoriAvenue between ArlingtonAvenue and PortolaAvenue • SartoriAvenue between Torrance Boulevard and EngraciaAvenue Vehiclevolume and speed counts willbe taken as dailysegment screen linecounts fora Tuesday and a Saturday at allthree locations.Additionally,vehicleclassificationcounts willbe collectedon Dominguez Street (eastof Crenshaw Boulevard),near the RTC. These locationsaim to capture the amount of vehiculartraffic travelingalong the multi-modal activetransportationtrailalignment. Data collectionwillincludevolume, speed, and vehicleclassificationinformationalong the corridorto gain a betterunderstanding about the type of activityoccurringwithinthe study area today and inform the facilitytype.
Bicycleand pedestrianvolume counts willoccur on a Saturday from 11:00 AM to 2:00 PM at allthree locations.The bicycleand pedestrian counts willbe taken as screen line counts that willallow us to assess how many people walk or bike through thisarea and theirdirectionof travelon a weekend at midday, which is anticipatedto be one of the peak activityperiods.
Collisiondata forthe corridorwillbe collectedcoveringthe most recent 5-year period forwhich complete collisiondata isavailable.The UC BerkeleySafeTREC Transportation InjuryMapping System (TIMS) or other locallypreferredgeocoded collisiondatabase willbe used.
Consistent with the goal of prioritizingCity ROW and not usingthe railproperty as part of the strategy,parking data on SartoriAvenue willbe collectedto evaluate parking supply and utilizationalong SartoriAvenue to determine how impactfulthe conversion of parkingto a high-qualityactivetransportationconnection along SartoriAvenue would be. Hourly parkingoccupancy sweeps willbe collectedon a weekday between 3:00PM and 8:00PM along SartoriAvenue, PortolaAvenue, ArlingtonAvenue, Cravens Avenue, and Engracia Avenue, when most residentswould be expected to be home. This willofferinsightintothe levelof parkingutilization, where a low parking utilizationwould suggest that parking could be converted while there would stillbe parking availableon nearby cross-streets.Ifparkingconversion isnot an option,other alternativescan be explored.
Deliverables:
• Segment/intersectioncounts & analysis.
• Collisionanalysis.
• Parking supply and occupancy data.
• Briefmemorandum summarizing resultswith tablesand figures.
Ill ProjectUnderstanding& Work Plan | ProposalForMultiuseActive Transportation TrailProject 18Section 2 87 Task B: PreliminaryDesign Services (PAED)
Subtask B.Ol: Draft Schematic Package
The ActiveTransportationtreatments presented inthe Approach sectionof our proposalare inresponse to the settingof each of the fivecorridorsegments (Segments A-E)we've developed from our field investigations.The fiveSegments are furtherdescribed below followedby the draftschematicpackage task contents.
Segment A, “Transit Link”
This segment followsthe east sideof Crenshaw from the RTC'sexistingsignalizedcrosswalkdown to Dominguez and consistsof a ClassImultiuse trail.Thistrailwillbe separated from Crenshaw Blvd.to avoid high speed and volumes on vehicles.
Note: An option to add a new trafficsignaland crosswalk at Crenshaw and Dominguez to connect the trail directlyto the RTC willbe explored forthissegment.
Segment B, the “Road Diet”
This segment heads east from Crenshaw Blvd.over to about Acaciaalongthe northern edge of Dominguez.
The approach here employs a "Road Diet"strategyto reduce the roadway and convert to ClassImultiusetrail.
Segment C, “Abandoned Rail Corridor”
For thissegment, the Class Iseparated multiuse trailmoves intothe Cityowned abandoned railcorridor parallelingDomguez and continues east and then south to Portola.
Segment D, “Complete Street”
The Class Imultiuse trailtransitionsto Complete Streettreatment with high visibilitygreen ClassIIbike lanes or sharrows on Sartori'snorth/southone way couplet.Pedestrians are directed to the sidewalks shaded with new streettreesforan attractivewalking experience to Downtown Torrance.
Note: Longer term, Segment D could become a RailTrailprojectifthe Citypursues acguisitionof a portion of the UPRR right-of-wayto extend the ClassImultiuse trailfrom Portola down to Torrance Blvd.
Segment E, “Scramble Intersection”
This segment isthe transitioninto Downtown Torrance and includesa "Scramble Intersection"set up. Here, working with our trafficteam, the intersectionsignalphasing would be modified to shut vehicletrafficoff on allintersectionapproaches and to allow pedestrians and bikesto crossTorrance Blvd.inalldirections, includingdiagonally(though not required).
Inthe spiritof exploration,RRM's team willdevelop a draftschematic package inthe form of a seriesof drawings illustratingthe multi-modal activetransportationtrailcorridor'sprimary and alternativealignment options,access points,and streetcrossingideas.The drawings willaddressthe followingmajor components:
• Class I Multiuse TrailAlignment
The trail'sfullsectionand alignment forSegments A, B,and C willbe developed to locateitwithinCity property and separated from vehiculartraffic.The drawings willshow Right-of-Way (ROW), amenities such as seatingarea,shade structures,and wayfinding signage.Conceptual levelgrading willbe shown to demonstrate how the trailwill work within the available space,how itwillconnect to streetgrades,and where potentialretainingwallswillbe located.
• Neighborhood Street Crossings
Along Segment C at Acacia,Madrid, Amapola, and Cota,conceptual levelplans wilbe developed to show new crossingdesigns to linkthe adjacent neighborhood to the ClassItrailalong Dominguez. This scope assumes the Citywillprovide recent trafficcount data for Dominguez and the intersectingstreets. ill Section2 |ProjectUnderstanding& WorkPlan 19Proposal For Multiuse Active Transportation TrailProject 88 Along Segment D at Portola,Arlington,Cravens,and EngraciaAvenues, conceptual levelplanswillbe developed to show the new bikelanealignment,new crosswalkstriping,and trafficcontroldevices specificto each crossinglocation.Thisscope assumes the Citywillprovide recent trafficcount data for Sartoriand the intersectingstreets.
• SartoriComplete Street Alignment
Complete StreetstrategiesforSegment D willbe developed to locateimprovements withinCity's38-foot ROW to linkpedestriansand cycliststo the ClassImultiusetrailterminus inSegment C and Downtown Torrance.The drawingswillincluderoadway restripingto add inhighvisibilitygreen ClassIIbikelanes and/or Sharrows ineach directionforcyclistsand improving the sidewalksalong Sartorito attract pedestrianswith shaded cool path of travelaway from vehicles.An option on the northeast sideof Sartori to move the curb,gutter,parkway, and sidewalkback a few feet to accommodate a full-width Class IIbike trailwillalso be explored.
• Track Crossings
At Portola,Arlington,Cravens,and EngraciaAvenues inSegment D, east/west pedestrianfacilities willbe developed to complete each intersectionto provide clearpath of travelto cross Sartori.This includescrossingthe UPRR trackswithinthe City'sROW. RRM's team willprepare conceptual level crossingdrawings to illustratethe crossingconfiguration,trackpanel placement, striping,and signage improvements.
• Torrance Boulevard Crossing
At Torrance Boulevard in Segment E, RRM's team willexploreintersectiondesign,signalphasingincluding a scramble phase, and lane configurationoptions to connect the Sartorialignment with Downtown Torrance. RRM's team will obtain new trafficcounts foralllegsof the Torrance and Sartoriintersection. • Lighting
An overhead traillightingsystem between the Crenshaw and PortolawithinSegment B and C willbe explored and developed. The drawings willshow lightpost locations,pointsofconnections,and mounting heights.
The draftschematic design package willbe communicated through a combination of planview graphics and sectionsas deemed appropriateby RRM. The package willbe shared withthe publicatthe upcoming community meeting.
Deliverables:
I • Draftschematicdesignplanpackage.
Subtask B.02: Community Workshop #1 - Alignment Ideas
RRM willfacilitatea community workshop to describeeach of the multi-modal activetransportationtrail corridor'ssegments and share initialalignment ideasand options along the route.The routing ideas willbe presented and evaluated through an interactiveprocess with the goal of arrivingat a preferredplan.We envisionthe workshop program as follows:
• Open house session(informaldiscussionand viewing exhibits) • Presentationof conceptualalternativedesigns(PowerPointor similar) • Breakout group review of alternatives
• Interactivealignment consensus exercise
• Wrap up and next steps announcement
III Section2 ProjectUnderstanding& Work Plan \ ProposalFor MultiuseActive Transportation TrailProject 20 89 This process willallow RRM's team to move forward witha clearlydefinedalignmentand advancethe project to the revisedschematic package level.
Deliverables:
• Prepareforand conduct one (1)community workshop.
• Workshop photos and graphicmaterialforposting.
• Workshop summary memo.
Subtask B.03: Revised Schematic Package
Based on the resultsof the community workshop and the City'sdirection,RRM's team willdevelop the preferredmulti-modalactivetransportationtrailalignmentto a revisedschematic planlevelforpresentation back to the community atan upcoming second community workshop. The package willprovide more details on the project'smajor components such as:
• Trailalignment through each corridorsegment
• Amenities along the route
• Retainingwall locations
• Bike lane design
• Sidewalk improvements
• Street/trackcrossingdesign
• Bike/pedestriantrafficcontroldevices
• Lane restriping
• Trafficsignalmodifications
• Lightinglocations
• Street tree locations
The revisedschematic design package willincludea cost estimate and willbe communicated through a combination of planview graphics,sections,and three (3)perspective visualizationsto illustratevarious projectconditionsalong the corridor.
Deliverables:
• Revised schematic design plan package.
• Three (3)perspectivevisualizations.
• One (1)preliminarycost opinion.
Subtask B.04: Community Workshop #2 - Revised Schematic Pian Presentation Now with the revisedschematic package ready to share,RRM willfacilitatea second community workshop.
The goal Isto review the ideasgenerated at the earlierworkshop and how the community influencedthe ultimatedesign and then present the revisedschematic design'skey features.We envisionthe workshop program as follows:
• Open house session(informaldiscussionand viewing exhibits) • Presentationof the Revised Schematic Plan (PowerPoint or similar) • Interactive comment collection at the Boards
• Wrap up and next steps announcement
Deliverables:
I • Preparefor,andconductone(1)communityworkshop.
I • Workshopphotosandgraphicmaterialforposting.
( • Workshop summary memo.
lii Section2 |ProjectUnderstanding& WorkPlan 21Proposal For MultiuseActive TransportationTrailProject 90 Subtask B.05: FinalSchematic Package
Based on the comments receivedatthe second community workshop and the City'sdirection,RRM's team willdevelop the finalschematic package to a 30% constructiondocument level.At thisstage,the project's major components described inSubtask B.03 willbe clearlycommunicated and packaged forpresentationto the CityCouncil.The finalschematicdesignplanpackage willbe communicated througha combinationof plan view graphics,sections,elevations,and visualizationsprepared inSubtask B.03,and willincludean updated cost estimate.
Deliverables:
• Finalschematic design plan package.
• One (1)updated preliminarycostopinion.
Subtask B.06: City Council Presentation - Finai Schematic Package Approval RRM willwork with the clientteam to prepare forand presentthe finalschematicdesignplanpackage to the CityCouncil.The goal of thispresentationisto communicate the finalschematic design and share the project'skey highlights.The other goal of thismeeting isto seek approvalofthe schematicdesignpackage so our CEQA planner can post the Notice of Exemption (NOE) with the County of Los Angeles County Clerk, and the design team can proceed to the finaldesign phase. RRM willdevelop a power point and/or other presentationsupport media/graphicsas determined appropriateby the City/RRM team forthe presentation viaan online meeting platform.
Deliverables:
• Prepare forand present the finalschematic design plan package to CityCouncil. • Support media/graphics.
iderstanding& Work Plan | ProposalForMultiuseActiveTransportationTrailProject 91 Task C: CEQA Compliance Services (PAED)
Subtask C.Ol: Notice of Exemption
The improvements proposed forthe planned multi-modal active transportation trailwould be considered a projectunder the CaliforniaEnvironmental QualityAct (CEQA) and willrequireappropriateenvironmental compliance documentation.Article19 of the CEQA Guidelinesprovidesa listof classesof projectswhich have been determined not to have a significanteffecton the environment and thereforecan be exempt from the provisionsof CEQA. The projectscope of work includesimprovements inthe publicright-of-waythatprovide for a continuous multiuse trailbut utilizesdifferent types ofopportunitiesto upgrade existingfacilitiesalong the routeto accommodate pedestriansand cyclists.Based on these assumptions,the designwhich optimizes the existingright-of-wayand providesthe community benefitof a continuousmultiusetrailfrom the Regional TransitCenter to the core of downtown Torrance,preliminarilyappears to qualifythe projectfora Categorical Exemption through two categories-Class1 (ExistingFacilities)and Class4 (Minor Alterationsto Land).
RRM proposes to analyze the projectforCEQA compliance and anticipatespreparationof a Noticeof Exemption (NQE) usingthe standard Noticeof Exemption form contained inAppendix E of the CEQA Guidelineswith a briefsupportinganalysisrelyingon existingavailableinformation.No new technicalanalysis isproposed. Within fivedays followingthe approval of multi-modalactivetransportationtrailimprovements by the CityCouncil,RRM willpost the NOE with the County of Los Angeles County Clerk,and Citystaffwill be responsiblefor postingthe NOE at Cityfacilities.Inthe event proposed improvements are more substantial and determined to potentiallyhave a significanteffecton the environment, RRM would outline needed strategies,and thistask and budget would be reviewed and rescoped as needed.
Deliverables:
• Review of existingavailable,relevantdocumentation.
• Notice of Exemption (NOE) completed form with briefsupporting analysis. 92 Task D: FinalDesign Services (PS&E)
Subtask D.01: Supplemental Field Survey
As the Projectmoves from PreliminaryDesign phase to the 65% constructiondocument level,the engineering team willdevelop a finalsetof survey data capture mark outs.Guida willpickup the requestedfieldsurvey data,which istypicallyfocused on additionaltie-inhorizontaland verticalcontrolpointsto complete the engineeringdesign.Supplemental data willbe incorporatedintothe Projectbase file.
Deliverables:
I • SupplementalfieldsurveydatainAutoCADformat.
Subtask D.02: Subsurface UtilitySurvey
With the project'slimitof work establishedat the conclusionofthe PreliminaryDesigntask(TaskB),RRM's will utilizeGuida to map existingutilitiesto locatepotentiallyaffectedutilitiesinthe projectarea.Underground utilitieswillbe located,marked, and surveyed with the data downloaded directlyto AutoCAD base file.RRM willprepare and submit utilitynotificationlettersto potentiallyaffectedutilitiesinthe projectarea as part of Subtask E.03.
Deliverables:
I • UndergroundutilitiesinAutoCADformat.
Subtask D.03: Geotechnical Investigation
With the project'slimitof work establishedat the conclusionof the PreliminaryDesign task(TaskB),RRM's geotechnical engineer,GPI, willconduct geotechnical investigations,and prepare a draftand finalgeotechnical report.Work willincludeliteraturereview,sitereconnaissance and fieldmarking of testboring locations, drillingand sampling of two (2)subsurface borings,infiltrationtestingattwo (2)testlocationsalongthe alignment, laboratorytesting,engineering analysisand preparationof a draftgeotechnicalinvestigation report. Following one round of reviews by the team, we willincorporate the review comments intoa final design-levelgeotechnicalinvestigationreport.The report'sfindingswillbe used to develop geotechnical recommendations for design of pavements, hardscape/walkways, retainingwalls,and foundations for minor structuressuch as sitewallsand lightpoles.The reportwillalsodevelop geotechnicalrecommendations for water qualityand treatment design.Thisscope assumes an encroachment permit willbe requiredforthe fieldworksinceitwilltake place with Cityrightof ways.
Deliverables:
• Draftgeotechnicalreport.
• Finalgeotechnicalreport.
Subtask D.04: Post Construction Stormwater Management Plan RRM willprepare a Post ConstructionStormwater Management Plan based on the City'sMunicipal Separate Storm Sewer Systems (MS4's).The plan willbe developed to take advantage of any proposed site improvements to utilizelow impact techniques to providewater qualitytreatment.Where possible,source controltechniques willbe proposed, low maintenance and simplesolutionswillbe sought over proprietary Best Management Practices(BMP's) when possible.The Stormwater Management Plan willbe submitted to the Cityfor review.Itwillquantifyand describethe PostConstructionBMP's to be used inthe project.Based on the City'scomments, RRM willrevisethe Stormwater Management Plan.
A projectplan willbe included,illustratingthe projectsite.Drainage Management Areas (DMA's),and the locationof BMP's. Operations and maintenance procedures will be defined.
Ill Section2 |ProjectUnderstanding& WorkPlan\ Proposal For MultiuseActive TransportationTrailProject 24 93 Deliverables:
• One (1)draftpost constructionstormwater management plan. • One (1)finalpostconstructionstormwater management plan.
Subtask D.05: 65% Draft Construction Documents
RRM willprepare 65% DraftConstructionDocuments (seeConstruction Document Package Contents listedin SectionV) based on the approved finalschematic plan package. The 65% DraftConstruction Documents will be submitted to the City'sProjectManager fordistributionand review.
Deliverables:
• 65% DraftConstructionDocument package (electronicfile). • One (1)constructioncost opinion (electronicfile).
Subtask D.06: 90% Draft Construction Documents
RRM willprepare 90% DraftConstruction Documents thataddress plan-checkcomments generated from the City'sreview of the 65% constructiondocument submittal.The 90% Draft Construction Documents will be submitted to the City'sProjectManager fordistributionand plan-check.
Deliverables:
• 90% DraftConstructionDocument package (electronicfile). • 65% response to comments memo (electronicfile).
• One (1)constructioncost opinion (electronicfile).
Subtask D.07: 100% Draft Construction Documents
RRM willprepare 100% Draft Construction Documents address plan-check comments generated from the City'sreview of the 90% constructiondocument submittal.The 100% Draft Construction Documents will be submitted to the City'sProjectManager fordistributionand back-check.
Deliverables:
• 100% Draft Construction Document package for back-check (electronicfile). • 90% response to comments memo (electronicfile).
• One (1)Updated Construction Cost Opinion.
Subtask D,08; Bid-Ready Construction Documents
RRM willprepare the Bid-Ready Construction Documents to address any back-check comments generated from the City'sreview of the 100% construction document submittal.Once the finalrevisionsare complete, one (1)signed reproducibleBid-Ready set of Construction Documents willbe submitted to the City'sProject Manager forfinalCity/Agency signaturesand bidding.
Deliverables:
I • One (1)signedreproducibleBid-Readyconstructiondocument package (electronicfile). ill Section2 |ProjectUnderstanding& WorkPlan 25Proposal For MultiuseActive TransportationTrailProject 94 Task E: Project Coordination Services (PAED/PS&E)
Subtask E.Ol: Project Coordination and Management
RRM's projectmanager willcoordinatewith City,designstaff,sub-consultants,and otheragenciesas necessary on an on-going basisthroughout the project'slifecycle.Thistaskalsoincludesprojectschedule creationand maintenance as tasksare completed, document review,and day-to-dayprojectcoordination effortsincludinggeneralcorrespondence and telephone conferencingas requiredto supportCitystaffduring the Project'sdevelopment.
Deliverables:
• Memos, meeting minutes, project schedule maintenance and general correspondence fordocument control,compiled inelectronicfileform.
• Projectschedule creation and maintenance.
Subtask E.02: Project Development Team (PDT) Meetings
RRM's projectmanager, and appropriateteam member(s) as the subjectmatter dictates,willprepare forand attend up to ten (10)PDT meetings with the Clientteam duringthe lifeof the project.Thisscope assumes two (2)meetings willbe in-personmeetings and eight(8)meetings willbe conducted viaTeams, or another acceptable video conference platform.These meetings willprovidean opportunityto collectivelyreview, discuss,and clarifyany design issuesso that work may proceed inan efficientmanner.
Deliverables:
• Prepare forand facilitateup to two (2)in-person PDT meetings. • Prepare forand facilitateup to eight(8)video conference PDT meetings. • Prepare and distributemeeting notes.
Subtask E.03; UtilityCoordination
RRM's team willwork with utilitycompanies whose facilitiesare known to be located withinthe Project limitsand may be affectedby the proposed improvements. RRM willprepare and submit utilitynotification lettersto potentiallyaffected utilitiesinthe projectarea.RRM willcoordinate the trail'sdesign with affected utilityrepresentativesand prepare exhibitsof the proposed improvements forsubmittaland review by these affected utilities.
Deliverables:
I • Prepareandsubmitprojectnotificationlettersto affectedutilitycompanies.
Subtask E.04: GO 88-B Processing and CPUC/UPRR Coordination Based on the revisedschematic design,RRM and our railroadengineer, RailPros,willcoordinate with the CaliforniaPublicUtilitiesCommission (CPUC) to process GO 88-B permit applicationsfor modifying the five (5)activeat-graderailroadtrackcrossingsinthe SartoriAlignment section and at Torrance Blvd to add in bike lanes and pedestrian facilities.The modification locationsare at Portola,Arlington,Cravens,and Engracia Avenues, and Torrance Blvd.As part of thistask,RailProswillfacilitatea virtualdiagnosticand a one-day on sitefielddiagnosticmeeting with CPUC, City,and RailOperator/Owner (UPRR)staffatthe proposed crossing modificationlocationsto develop design consensus forthe modifications.Followingthe Diagnosticmeeting, RailProswillprepare the application,develop exhibitsforthe applicationpackage,and submit the application to the CPUC for approval.
Ill Section2 ProjectUnderstanding& Work Plan \ ProposalFor MultiuseActive Transportation TrailProject 26 95 The approved engineeringcrossingdesignwillbe incorporatedintothe constructiondocument package.This scope excludepreemption calculationsand assumes any crossing equipment modifications willbe within the scope of requirementsofa GO 88-B permitand excludespursuitofa FormalApplicationfora railcrossing project.
Deliverables:
• Facilitateone (1)virtualdiagnosticmeeting.
• Facilitateone (1)fielddiagnosticmeeting.
• Fielddiagnosticnotes.
• Five(5)At-Grade crossingexhibits.
• Five(5)CPUC GO 88-B applications,processing,and coordination.
Subtask E.05: QA/QC Review
At the 65%, 90%, and 100% construction document milestones,RRM willconduct an internalQA/QC review.
RRM assignsan in-houseQA/QC manager who isnot a partofthe designteam. Using RRM's QA/QC checklist, a QA/QC team thatisnot partof the designteam willreview the projectto ensure disciplinesare fully coordinated,key informationisincluded,referencespointto the correctlocation,and specificationstiedinto the drawings.This review,and correctivemeasures, willoccur priorto each package (65%, 90% & 100%) being submitted to the City.
Deliverables:
• QA/QC comments incorporatedintothe 65% DraftConstructionDocument package. • QA/QC comments incorporatedintothe 90% DraftConstructionDocument package. • QA/QC comments incorporated intothe 100% DraftConstruction Document package.
Site Photo
>r*
Z7
96 Task F: Optional Services
Subtask F.Ol: Project Funding Research
RRM's municipalfunding specialist,Avant-Garde, willconduct research to identifypotentialgrants and related fundingsourcesfrom federal,state,foundations,agencies,and organizationsthatsupport the City'sfunding needs for implementation. The goal isto seek funding sources forwhich the projectcan be both eligibleand competitive.With potentialfunding sources identified,Avant-Garde willassistthe Cityindeveloping an overal strategicplan forfunding opportunitiesinclusiveof prioritizingschedules and timelinesforeach identified grant.
Deliverables:
I • Fundingsourcematrixwithkeymilestonedatesfor application.
Subtask F.02: Additional Public Meetings (2 PC and I CC) RRM willwork with the clientteam to prepare forand present the projectat up to four (4)additional publicmeetings inadditionto the meetings included inTask B.Thisscope assumes up to two (2)Planning Commission meetings, one (1)additionalCityCouncilmeeting, and one (1)additionalCommunity meeting.
RRM willdevelop a power pointand/or other presentationsupport media/graphicsas determined appropriate by the City/RRM team forthe presentation.
Deliverables:
I • Prepare forand presentthe projectat up to four (4)additionalpublicmeetings. • Support media/graphics.
Subtask F.03: New TrafficSignal Design at Crenshaw and Dominguez Fehr & Peers willprepare trafficsignalplansand detailsfor a new signalat the intersectionof Crenshaw Boulevard and Dominguez Street.The trafficsignalplanswillincludenew signalequipment, as wellas vehicle and bicycledetection equipment. The trafficsignaldesign willbe prepared inaccordance with the Cityof Torrance requirements and the CaliforniaMUTCD. The trafficsignalplanswillincludesignalpoles and mast arms, vehicledetection loops,vehicleand pedestrian signals,controllercabinet assembly, and the conductor and equipment schedules.The constructiondocuments for the new signalwillbe incorporated intothe 65%, 90%, 100% and Bid-Ready milestones packages described in Task D.
Deliverables:
I • Signalmodificationplansanddetailsincorporatedintothe 65%, 90%, 100% and Bid-Ready packages.
Site Photo
97 III.ClientResponsibilitiesand Assumptions
Meeting locationand facilities.
Publicmeeting noticing.
One contact person who willserve as the City'srepresentativeand willconsolidateallAgency review comments into one listof officialcomments to which RRM can respond.
Prepare bid and contract"boilerplate"documents, such as bidform, invitation,instructions,generaland specialconditions,contractforms, insurance,forms, etc.
Document distributionfordesignreviews,bidding,and construction.
Biddingand constructionmanagement, inspection,and testing.
Projectspecificationswith be prepared inGreenbook format.
The projectwillqualifyfora CategoricalExemption through two categories-Class1 (ExistingFacilities) and Class4 (Minor Alterationsto Land).
The projectwillbe locatedcompletely on Cityproperty,and no property acquisitionsor easements are required.
Additionalintersectioncounts and levelof service(LOS)analysisare not proposed because itisnot anticipatedthat the projectwould resultinthe reduction of a travellane,thereforesegment and intersectioncapacity would remain the same.
Potablewater serviceforirrigationsystems willbe utilized.
IV.Limitation of Scope
Please note that the tasksto be performed by the RRM team are limitedto those outlinedabove. Thisscope of servicesexcludes the following:
• Right-of-Wayacquisitionnegotiationservices.
• Record boundary survey.
• Preparationof the SWPPP and SMARTS registration(Contractor'sresponsibility). • Utilityanalysisor improvement beyond projectlimit.
• Utilityvideotaping.
• NEPA compliance services.
• More than one (1)bid package.
• Payment of fees (permit,processing,noticing,etc.).
• Arborist services.
• Recycled water permit.
Any additionalservicesthat RRM Design Group isasked to perform over and above the tasksdescribed above willbe billedon a negotiated and Cityapproved fixedfee or hourly basisas additionalservices.
V. Construction Document Package Contents
Title and Reference Sheets
RRM willprepare titlesheets,as necessary,to convey allpertinentgeneral projectinformation.These sheets may includeprojectname, location,approval blocks,agency contact information,USA alert,basisof survey statement, listof abbreviations,phasing and/or additivealternate instructions.
Demolition Plans
RRM willprepare demolitionplans,at an appropriatescale,forstructuresand elements requiringremoval in order to implement the Project'sdesign.The planswilllocate,identify,and describethe removal items and provide instructionsforthe safe disposalof the demolished work. Additionally,the planswillindicateitems to salvage or stockpile.
Ill Section2 ProjectUnderstanding& Work Plan \ ProposalForMultiuseActive Transportation TrailProject 29 98 Erosion Control Plan
RRM willprepare ErosionControl Plansforthe sitedepictingproposed constructionBest Management Practice's(BMP's) inconformance with the StateConstruction General Permit.The planswillincludeplan views with locationsof proposed BMP's, and detailsof the BMP's. Thisscope assumes the Contractorwill prepare the SWPPP.
Construction Keynote Plans
RRM willprepare constructionkeynote plans,at an appropriatescale,forthe approved design.The planswill present the overallProject'slayoutwith a keynotingsystem that identifiesallconstruction items, references to appropriate details,and drawing seriesdirections.
Site Construction Details
As a companion to the constructionplans,RRM willprepare detailsfor allthe construction items illustratedon the siteconstructionplans.The detailswillspecifymaterials,dimensions, colors,and finishes.
Cross Sections
As a companion to the construction plans and details,crosssectionsof the trailwillbe created at regular spacing to communicate the intentof the Projectto the contractor.
Horizontal Control and Profile Plans
RRM willprepare horizontalcontroland profileplans,at an appropriatescale,forthe approved design.The plans willestablishallhorizontalcontrolforthe Project.The plans willalsoestablishconstructionlayout controlpointsand establisha coordinate system forlocatingallsiteelements.
Grading and Drainage Plans
RRM willprepare grading and drainage plansand profiles,at an appropriatescale,forthe approved design based on the Geotechnical Engineering Report. The plans willbuildon the topographic survey informationand willshow verticalcontrolof the Project'selements, contour grading,spot elevations,and cut and fillestimates withinthe projectsite.The planswilldetailthe proposed bio-retentionareas,swales,and other drainage facilitieswithinthe Project'sdevelopment area.
Stripingand Signage Plans
Fehr & Peers willprepare signingand stripingplans and detailsfortrailcrossingsat intersections,and depending on the alignment and type of facility,corridorstriping.Planswillincludeexistingsigningand stripingto remain, existingsigningand stripingto be removed, and new signingand stripingto be installed.
They willalso include construction detailsassociated with trailcrossings.The designs willbe prepared in accordance with the Cityof Torrance requirements and the California MUTCD.
TrafficSignal Modification Plans at Torrance Blvd.
Fehr & Peers willprepare trafficsignalmodificationplans and detailsfor the Torrance Boulevard at Sartori Avenue intersection.The trafficsignalmodificationsplanswillincludenew and/or modified signalequipment, as well as vehicleand bicycledetection adjustments as needed to accommodate the trailcrossings.The trafficsignaldesign willbe prepared inaccordance with the Cityof Torrance requirements and the California MUTCD. The trafficsignalplanswillincludesignalpoles and mast arms, vehicledetection loops,vehicleand pedestrian signals,controllercabinet assembly, and the conductor and equipment schedules.
Track Crossing Plans and Details
Where the pedestrian facilitieswillcross the railroadtracksat Portola,Arlington,Cravens,and Engracia Avenues, and Torrance Blvd.,RRM's railengineer,RailPros,willprepare plansdetailingtrackpanel installation, track and track bed adjustments, and passive railcrossingcontrolsystems (e.g.,signsand warnings).
Ill Section2 30ProjectUnderstanding& Work Plan \ ProposalForMultiuseActive Transportation TrailProject 99 Electrical Plans and Details
RRM's electricalengineer,P2S,willprepare utilityservicedistributionplans,circuiting,fixtureschedules,panel schedules,and electricalcalculationsto provideelectricalserviceforan overhead lightingsystem alongthe Class Itrailwithin the old railROW between Crenshaw and Portola. P2S willcoordinate with SCE to facilitate the utilityapplicationprocess.
Note: Utilitycompany improvement design willbe provided by SCE. RRM's electricalengineer willendeavor to describesuch work for bid purposes as itisavailableto us at the conclusionof the constructiondocument process.Utilitycompany designs are subjectto SCE'sreview and finalapproval on theirtimeframe.
Constructionof the utilitycompany's improvements must be obtained directlyfrom SCE as a "hand out package".
IrrigationPlans and Details
RRM willprepare irrigationplans and detailsfora new system along the ClassItrailrunning through the old railROW between Crenshaw Blvd. and Portola Ave. For segment D along Sartori,RRM willprepare irrigation system modificationplansforareas affectedby sidewalkimprovements and introduction of new streettrees.
The planswillshow tieinlocationsto the existingirrigationsystem and layoutof new main line,spray heads, piping,valves,and/or dripsystems. Insupport ofthe irrigationplans,irrigationdetailswillbe prepared that communicate the method of constructionand proper irrigationsystem component procedures. This scope excludes compliance with the State'sModel Water EfficientLandscape Ordinance (MWELO) sincethisproject isconsidered a landscape maintenance project.
Planting Plans and Details
RRM willprepare plantingplans along the Class Itrailrunning through the old railROW between Crenshaw Blvd.and PortolaAve. Streettree plantingplans willbe prepared forthe parkways along Sartori.The plans willshow the layoutof plantingindicatingplantspecies,quantity,sizeand locationof shrubs,ground cover, and trees.Insupport of the plantingplans,plantingdetailswillbe prepared that communicate the method of construction and proper plantingprocedures.
Specifications
RRM willprepare technicalspecifications(formatted and based on the Greenbook Specifications).Thisscope assumes the Citywillprepare allgeneral provisionspecificationsectionsrelatedto thisprojectand assemble the specificationsbook.
Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65% and 90% submittal levels and then update the estimate forthe 100% submittal.The detailedConstructionCost Opinion willbe itemized with supporting item descriptionsand unitcosts inthe Bid Form format.Due to many variablessurrounding bidding and construction conditions,thisopinion willnot represent a guarantee that bids received or actual costs of constructionwillbe equal to the opinion.
lii Section2 ProjectUnderstanding& Work Plan | ProposalForMultiuseActive Transportation TrailProject 31 100
101
«f
IIP
Section Three:
Qualifications
Firm Profile
Organization Chart
Key Team Resumes
Project Examples
4vl
<v ,
€
■v;
4 t-
■rSSriii
mV'
irti- 5!S
■ ' 1 * •
.•%
.•■•*,-S'■■-
Tf*s^>r
■■lA
■^4
gig-
<$»3;
Pictured: Santa Cruz RailSegment 8,Santa Cruz,CA
33 102
r
RRM Design Group Firm Profile
50 Years of Creating Environments People EnjoyjKg design III group
RRM Design Group is a muitidiscipline firm
focused on Active Transportation projects
Establishedin 1974 inSan LuisObispo, RRM isa multidisciplinefirm focused on Active Transportation planning,design,and engineering.With a team of over 200 professionals,RRM primarilyserves publicagencies throughout California integrating transitionaltransportation planning concepts with actionable infrastructuredesigns to continue shiftingCalifornia'stransportation modes towards sustainability.
On the planning front, we develop Transit Oriented Development (TOD) projects,corridor studies,Safe Routs to School (SRTS) plans, station plans, firstand last mile systems, and multi-modal network master plans. On the design and engineering front,we prepare constructiondocument packages for multiuse trails,railtrails,greenways, on-street bike facilities,complete streets, roundabouts, trafficcircles,and roadways.
With over 100 state and federallyfunded transportation projects completed, many of those funded through the Active Transportation Program (ATP), RRM carries each project from preliminary design, through environmental clearance, into finalengineering design, and then construction. We do this through consistentand proactivemanagement of RRM's staff and our trusted subconsultant team of environmental, geotechnical,soil remediation, traffic, rail,and cost management firms.
7 RRM Offices
Lead officefor thisproject:
32332 Camino Capistrano,Ste 205
San Juan Capistrano, CA 92675
p: (949) 361-7950
Our headquarters are iocated at:
3765 South Higuera St.,Ste. 102
San LuisObispo, CA 93401
p: (805) 543-1794
Additional offices:
Santa Barbara, San Leandro,
Ventura, San Diego, and Seattle
100% Employee-
Owned Firm
RRM Design Group isa California
corporation and a 100%
employee-owned company (ESOP),
incorporated November 26, 1974
RRM recent projects in
the City of Torrance:
200+ Employees in6 Disciplineswith Key Certifications: Housing Corridor Distrit Analysis° eRoilSofeCertifiedStaff
« LEED* Accredited Professionals
° SITES Accredited Professionals
o Bay-FriendlyQualifiedProfessionals
• Architects
“ CA Licensed Architects
° Architecture Designers
• CivilEngineers
° CA Licensed CivilEngineers
° Engineering Designers
• Landscape Architects
^ CA Licensed Landscape Architects
• Planners & Urban Designers
“ CertifiedPlanners
° Planning/Landscape ArchitectureDesigners
• Structural Engineers
° CA Licensed Structural Engineers
• Surveyors
^ Licensed Surveyors
» Surveying Technicians
• Residential/Mixed-Use
Housing Overlay Study ^ ''''
•J-
• Land Use Element and
Safety
Element Update
• Housing Element
Implementation
m Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 103
We've Got You Covered
Everything you need in one package
(/)
V
>
CL
Q3 00 u
o c c
E
Ol u nj<uOl 1/1
cOJ Vo T3>c CL LO
Experience Cityof Torrance needs:
00 CL Q. roD rsi
o21/1 LO Q.
0) ns
UQ QC
DC-a cOQJ
DCnsC5 >
(DQC < Ucc
0)
a
X
Multiuse TrailDesign n/ >/ n/
>/Complete Street Design v/
>/Bike FacilityPlanning >/
>/TrafficEngineering n/
>/TrafficSignalModification v/
>/ v/Railroad Safety & Operations
n/ v/At-Grade Track Crossing Design n/
>/utilityLocating and Coordination
v'CPUC GO-88B Permitting >/
>/CEQA Compliance s/
>/Stormwater Quality Management v/
Community Outreach & Consensus Building n/>/
Commission and Council Presentations
Multiple Agency Coordination s/ \/v/
v'Addressing Local Concerns v/
>/ >/>/Cost Estimation and Value Engineering v/ n/
n/QA/QC & ConstructabilityReview v/
Wayfinding & Graphic Design
Grant Funding Research
1 III Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 35 104
Assembling Our Team for the City of Torrance
Hiringour company means investingin unparalieiedexpertise,exceptionaiservice,and innovativesoiutions tailoredto your specificneeds. We bringa wealth of experience and a proven trackrecord of success,ensuring that your projectsare executed with precisionand efficiency.Our dedicatedteam of professionalsiscommitted to deliveringoutstanding results,leveragingthe latesttechnologiesand best practicesto driveyour business forward. We prideourselveson our customer-centricapproach, buildingstrongrelationshipsand understanding your unique challengesto provide customized solutionsthatexceed expectations.By choosing us,you gaina reliablepartner dedicated to your growth and success.
RRM Design Group
Brian Hannegan
ASLA. PLA
Role: Project Manager, Complete Streetscape
Specialist & Main Point of Contact
Manager of Landscape Architecture
Mike Sherrod
ASLA, PLA. LEED AP
Role: Principal-in-Charge
Managing Partner
ProjectLead
Rachael Guraydin,
Role: ATP/Multiuse Trail
Specialist &
Landscape Architect
Sr.Landscape Architect
Pam Ricci-
Role: CEQA/
Environmental
Impact Specialist
PrincipalPlanner
Planr)ingand Urban Design
Noah Walters, ■
Role: ATP Civil
Engineering Lead
Project Manager
Cord Maszk
Role: Water Quality
Specialist
Engineer II m
i i
Landscape Architecture CivilEngineering
Subconsultants
GPI Geotechnical
Professionals, Inc.
Guida Geospatial
Solutions
f Survey& UtilityLocators E
Tim Fettig,PLS
Principal,VP
(949) 777-2023
[email protected]
OCMI.Inc.Fehr & Peers
TrafficEngineering Cost Estimating Geotechnicai Studies Miguel Nunez,
Principal
(562) 294-5848
[email protected]
Conor Clarke,
Vice President/Director
(714)651-6696
[email protected]
Paul Schade, G.E.
Lead Engineer
(714)220-2211
[email protected]
Avant-Garde Inc. P2S RailPros
f MunicipalGrantFunding j
Lissete Montoya,
Vice President and CFO
[email protected]
(909) 895-7146
] [ElectricalEngineering RailEngineering
Robert Williams, PE
(949) 383-2331
[email protected]
Gary Jewell,Lighting
Specialist& Studio Leader
(562) 497-2999
[email protected]
ill Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 36 105
Brian Hannegan |asla,pla
Project Role:Project Manager, Complete Streetscape
Specialist,& Main Point of Contact
Interweaving hisearlylove of nature and community, Brian Hannegan was ledto a careerin landscape architecture.From trails,greenways, and open spaces to recreationaland regionalparks,he bringsan all- encompassing approach to design.With over thirtyyearsof experience invariousarchitecturalsectors,Brianoffersan expansiveview of design.
Inspiredby the needs ofthe clientand community and the diverse talent of histeam, Brian'sexcitement for creativecollaborationtranscends intoeach of hisprojects.Through collaborativeparticipationand multidisciplinaryengagement, Brianiscommitted to creatingaccessible spaces that both enhance the naturalenvironment and benefit the vitalityand health of communities.
r Creating
Environments
People
Enjoyjl5| design
III group
Manager of Landscape
Architecture with 34
years of experience
Education
• Bachelor ofScience,Landscape
Architecture,California
PolytechnicState University,
San Luis Obispo, CA
Featured project experience
• 3rd Street North, South •
Bikeway, Avalon
• 25th Street Renaissance
Complete Streets,San Diego
• Angels Creek Master Plan and •
TrailPlan,Angels Camp
• Arana Gulch Master Plan
Implementation, Santa Cruz •
• Arcadia Gold Line Multimodal
Plan
• Chino HillsOpen Space
Management Plan •
• Escondido Creek TrailExpansion
and Renovation Design
• Gaffey Street,Los Angeles *
• Gaviota Coast Plan (Trail *
Planning)
• Hollister Avenue Multimodal *
Streetscape Improvements,
Goleta •
• Knickerbocker TrailDesign,
Big Bear Lake
• La Palma Green Promenade, *
Anaheim
• Las Positas Multiuse Trail *
Design, Santa Barbara
• Loma Santa Fe Multimodal *
Improvements, Los Angeles
Mission Boulevard PublicSpaces
and ActiveTransportation
Network,
San Diego
Monterey Bay Sanctuary Scenic
TrailNetwork Master Plan,
Santa Cruz
Otay RiverTrailDesign and
Restoration,Chula Vista
PorterfieldCreek TrailDesign,
Clover Springs
Licenses and more
• American Society of Landscape
Architects(ASLA),Southern
CaliforniaChapter
• Trustfor HistoricPreservation
• San Diego & Orange County
BicycleCoalition
• InternationalMountain Biking
Association Randolph StreetRailsto Trail
FeasibilityStudy, Huntington
Main Point of Contact
• p: (949) 325-0629
• e: [email protected]
Park
RiverVistaTrailDesign,Fresno
San Joaquin RiverTrailDesign,
Fresno
San LuisRey RiverTrail,
Oceanside
Santa Ana RiverTrailDesign
Hidden ValleyWildlifeArea,
Riverside
Santa Cruz Rail Trail Arts
Master Plan
Stanfield Marsh Boardwalk Trail
Design, Big Bear Lake
Whittier Greenway Trail
lil Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 37 106
Noah Walters |pe
Project Role: ATP CivilEngineering Lead
As both a lifelongartistand second-generationengineer,Noah has a passionforactivetransportation,residential,parks,and community development. He excelsat team coordinationand organizationwhich aid hisroleas a projectmanager. Noah lovesfiningcreative solutions for projects,and has a particularaffinityforstormwater and grading solutions.He has done work fora varietyof differentagencies throughout CaliforniawhilecallingIrvinehome. Noah is an active member of RRM's ProfessionalPracticeand Technology committee, the AutoCAD community, and RRM's TechnicalSystems User Group.
Featured project experience
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bandini Canyon Trail
Construction Documents,
San Pedro
• Chumash Park Master Plan,
Simi Valley
• Fairmont Terrace Park
Construction Documents,
Hayward
• Foothill Boulevard Master
Plan for PublicImprovements,
Claremont
• Harbor Terrace Substantial
Conformance Package,
Avila Beach
• Kennedy Park Construction
Documents, Hayward
• Lindero Linear Park
Construction Documents,
Westlake Village
• Mia's Dream Come True
Playground, Hayward
• Morro Bay Harborwalk
• Neff Park Improvements,
La Mirada
Creating
Environments
People
Enjoyrg designII group
Project Manager with 14
years of experience
San Lorenzo Park Community
Park Construction Documents
Santa Ana River Bike Trail,
Riverside
Santa Cruz RailTrailSegments
Education
• Bachelor of Science,Civil
Engineering,CaliforniaState
University,Northridge, CA
Licenses and more
• ProfessionalEngineer,CA,
90156
• American Instituteof Steel
Construction (AISC)
• American Society of Civil
Engineers (ASCE)
8-9
Santa Cruz RailTrailSegments
10-11
Santa Rosa Skate Park,
San LuisObispo
Sinsheimer Park Playground,
San LuisObispo
Sweetwater Summit
Campground, Bonita
Tennyson Park Construction
Documents, Hayward
Whittier Greenway TrailEast
ill Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 38 107
Rachael Guraydin |pla
Project Role: ATP/Multiuse TrailSpecialist&
Landscape Architect
I
^1^
Rachael has a wide varietyof experienceindifferentproject types, but her passionsliewith parkdesign.Her experiencerangesfrom concepts to master plans to construction documents. As a southern Californianative, Rachael ispassionateabout her localenvironment. She understands the need forwater conservationand embraces the designchallenges of the changing environment.
r Creating
Environments
People
Enjoy
design
group Featured project experience
• 25th Street Renaissance •
Streetscape,San Diego
• Escondido Clean California •
Gateway, Escondido
• Escondido Creek Trail, •
Escondido •
• Guymon Street Pocket Park Site
Development Permit,San Diego .
• Lomas Santa Fe Corridor
FeasabilityStudy, Solana Beach .
• Olympus Park,Encinitas .
• Otay RiverTrailDesign and
Restoration,San Diego County .
• Scott ValleyPark Playground
Replacement, Encinitas
• Park related work:
• CityHeritage Park,Parlier
• Creek Park, La Mirada
• La Palma Green Promenade and
Paseo
• Las PositasMultiuse Pathway,
Santa Barbara
• Lindero Linear Park,
Westlake Village
• Morro Creek Multiuse Trail and
Bridge, Morro Bay
• Neff Park, La Mirada
• PorterfieldCreek TrailsOpen
Space Preserve, Cloverdale
• Potrero Canyon Linear Park,
Pacific Palisades
• San Lorenzo Park,Hayward
San Sevaine TrailConnection,
Fontana
Santa Cruz Rail Trail Arts Master
Plan, Santa Cruz
Santa Cruz RailTrailSegment 7
Santa Cruz RailTrailSegments
Senior Landscape
Architect with 13 years
of experience
Education
• Bachelor of Landscape
Architecture, Minor is
Sustainable Environments,
CaliforniaPolytechnicState
University,San Luis Obispo, CA
8-9
Santa Cruz RailTrailSegments
10-11
Scotts Valley Park,Encinitas
Weekes Park Master Plan,
Hayward
WhittierGreenway TrailEast,
Whittier
Licenses and more
• ProfessionalLandscape
Architect, CA, 6227
• American Society of Landscape
Architects (ASLA), Student
Chapter Member 2008-2012,
Chapter Secretary of Southern
CaliforniaChapter (SCASLA)
2017-2018
ill SectionsjQualifications\ ProposalForMultiuseActive Transportation TrailProject 39 108
■ SI ■
>!t
:& MOD
LEGEND
Mission Boulevard Public Spaces
Opportunity Areas and Active Transportation Plan
Pictured: Mission Boulevard PublicSpaces and Active TransportationNetwork,Cityof San Diego,CA Up Next: Relevant Project Examples
m Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 40 109
I
» ■:i.«i»S^'‘■'j' - --V'-
m
^ m
?■%■
'•
■ /
*r
?ff-d? ■sr ■
■A
■«
Helen Putnam Award for
Excellence
- League of CaliforniaCities
Merit Award, Quality of Life
-American Society of Landscape
Architects(ASIA},California
Southern Chapter
Award of Excellence
- Park Planning & Design,
Community Park/Open Space, CPRS
B.E.S.T. Award inTraffic,
Mobility & Beautification
-APWA Southern CaliforniaChapter
Whittier Greenway & TrailEast
Whittier Greenway - RRM Design Group, inassociationwith Kimley-Horn Associates,prepared the master plan and construction documents for the 5.8-mileWhittier Greenway - a multiuse trailthat runs through the heart of the Citywithinan old Union Pacificright-of-way.The connectivity potentialforschools,residentialand commercial areas createsan exemplary alternativetransportationpathway inthe City.The projectincluded design of both paved and non-paved trails,signs,lighting,stagingareas,and reststops; refurbishment of historicrailroadbridges;revitalizationof vacant City-owned parcels;and landscape enhancement ina linearpark style.
Whittier Greenway TrailEast -The Cityof Whittierselected RRM Design Group to work with the City,Union PacificRailroad,Los Angeles County, and the CaliforniaPublicUtilitiesCommission (CPUC) to develop 7 at- grade crossingsand 2.5 milesof multiuse trailalong the active railline, the projectrequired prefabricatedbridges and engineered storm drainage systems to improve the water qualityof these sensitiveresources. A robust community engagement was utilizedthroughout the design development process to reach consensus forthisnew facilitywith specialconsideration to the adjacent property owners encroaching intothe corridor.The at-grade crossingdesign incorporatesa cross bike system incombination with an innovative chicane system to slow and stop cyclistsat the signalcontrolled crossings,and the CPUC has now accepted thiscrossingsystem as the prototypicalrailtrailcrossingforsouthern California.
Client & Location
Cityof Wbittiei,CA
The RRM Teams Involved
• Landscape Architecture
• CivilEngineering
• StructuralEngineering
• Surveying
Key Features & Elements
• Multiuse trail
• Prefabricatedpedestrian bridge
• infiltrationplanters
• Landscape improvements
• At-grade railcrossings
• Public art
• Retaining walls
* Soilmanagement
Project Timeline
Two phases from 2002-2023
Project Cost
24M
III Section3 |Qualifications\ ProposalForMultiuseActive Transportation TrailProject 41 110
No. 2 Complete Street
Policies of 2012 (tie)
- National Complete Streets
Coalition
Hermosa Beach Pier Avenue Street
Improvements
The Cityof Hermosa Beach hired RRM Design Group forthe redesign of a section of itsdowntown corridor.The PierAvenue improvement project created a pedestrian-orientedenvironment with trafficcalming featuressuch as safe mid-block crossingsat regionaltransitcenters and retailareas along the avenue, bike boulevard "sharrows" for access to the City'sgreenway and coastal trail,and new sidewalks with street trees that provide shading for new seating areas.
Additionaldesign elements include 85-watt induction streetlightsthat significantlyreduce energy use, as well as solar-powered warning flashers for mid-block pedestrian crossings.RRM also developed art and gateway elements to celebrate Hermosa Beach as a cultural center for some of surfing'sfamous icons.
Environmental Achievement
Award
- United States Environmental
ProtectionAgency (EPA)
Client & Location
Cityof Hermosa Beach, CA
The RRM Teams Involved
• Planning & Urban Design
• Landscape Architecture
• CivilEngineering
• Architecture
• Surveying
Project Cost
• 3.5M
III Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 42 111
Lomas Santa Fe Complete Streets
Corridor Study
Client & Location
Cityof Solano Beach, CA
The RRM Teams Involved
• Landscape Architecture
Project Timeline
2017-2024
RRM Design Group isworking with Michael Backer and the Cityof Solana Beach to develop new complete streetsstandards and beautificationplans for Lomas Santa Fe,the City'sprimary east west arterial.Lomas Santa Fe connect residenceon the east sideof the citywith the 1-5Freeway and west to downtown commercial core,the trainstation,and coastal beaches. This is alsothe main gateway forvisitorsto Solana Beach arrivingfrom 1-5Freeway.
The improvements includenew bike lanes,cyclestracks,improvements to pedestrianintersectioncrossings,sidewalks,streetscapetrees and landscaped medians, pocket parks,publicart,improved access to schools and transitstops,and a new roundabout. The projectalso closesa regional bikeway gap from PacificCoast Flighway (Flwy.101) through downtown Solana Beach to the east west connection via the Lomas Santa Fe Drive.
Project Cost
• 8M
Qualifications\ ProposalForMultiuseActiveTransportationTrailProject 43Section 3 112
^5®X.
^ ^ . 1'^• 'J
.w
. >•■ ■(:
'f'T* ... .
-t%l
■VJ.f •>1 i1^. 1!Wft' >J?
1 /,-V jr
i
1 .1IrV-
il'i
4 lttt«iiii;i} I
mmf‘'.S:.
'jffi
r.£'rkp'. I. f
V5
r* . •; ■04-- ■'fi ri '-S';--t..O'
’^1
-
H
I’/
bl
•> -• .
:--
fts-.**.
4 .w
Mission Boulevard Public Spaces and
Active Transportation Network
Client & Location
Cityof San Diego
The RRM Teams Involved
• Planning & Urban Design
• Landscape Architecture
Project Timeline
2016-2020
RRM Design Group was retainedto help develop multi-modal upgrades to the PacificBeach Community along Mission Boulevard and the waterfront.
The enhancement plansaddress innovativepedestrian,bike,and transit facilitiesthat create bettercirculation,crossingimprovements, community and regionalaccess to coastalresources,increased walkability,streetscape beautification,and road diet alternativesthat address trafficcalming and bike lanes along Mission Boulevard. The design alsoaddresses the side streetsalong Mission Boulevard, creatingmore walkable sidewalks and access to the waterfront.Adjacent improvements include design visioning for PacificBeach's boardwalk and coastal trail,further enhancing public open space, pocket parks and community gathering spaces connected by a vibrantcoast trailand greenway through PacificBeach. The comprehensive design visioningprocess involveda number of stakeholdermeetings with area businesses,localorganizations,citydepartments. Coastal Commission, Beautiful PB, and other residences and landowners.
Project Cost
• 6.8M
m Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 44 113
r.:
‘^T-::iitn
■ :Jt
Escondido Creek TrailExpansion and
Renovation Design
Client & Location
Cityof Escondido, CA
The RRM Teams Involved
• Landscape Architecture
• CivilEngineering
• Planning
Key Features & Elements
• Natural surface trails
• Class I Trail
• Biorentention areas
• Wayfinding interpretivesigns
• Landscape improvements
• Trail amenities
• Retaining walls
• Public art
Project Timeline
Design: 2020-2025
Project Cost
• 18M
Afterbeing awarded $8.5 millionfrom the CaliforniaDepartment of Parks & Recreation through the Prop 68 Parks & Water Bond Act, the Cityof Escondido hired RRM Design Group to lead the design of a transformative 4,5-milesegment along the Escondido Creek corridor.The goal was to create a premier lineartrailand park system that Increasesaccess to parks and recreationforthe localcommunity. Throughout the project,RRM facilitated both remote and in person interactivepublic outreach and stakeholder meetings to assistthe community inthe visionof the greenway. RRM led the design and constructiondocuments for4.5 milesof the creek trail and greenway which includesnew naturalsurface trails,resurfaced and extended paved classImultiuse trails,new connections to the west end of town, bioretentionareas,new corridorlandscape,pollinatorgardens, publicart, trailheadamenities, and outdoor fitnessstations.Improvements emphasize safety,accessibility,and community involvement by expanded partnerships with localbusinesses, artists,schools, and environmental organizations.
These enhancements aim to revitalize the Creek Trail Corridorby fostering healthy,activelifestylesand ensuring a consistentand invitingatmosphere along the trail.
Ill Section3 Qualifications| ProposalForMultiuseActiveTransportationTrailProject 45 114
"■Ns:
“Ican'tspeak highlyenough
about RRM Design Group.
They are literallythe best
consulting firm Ihave ever
worked with.”
- Cory Caletti,Former Senior
Transportation Planne,rRegional
TransportationCommission of Santa
Cruz County
.. -T. .
Outstanding Plan Award
-Associateof Environmental
Professionals(AEP)
Award of Excellence,
Transportation Planning
-American Planning Association
(APA), CaliforniaChapter, Northern
Section
* '
Award of Engineering
Excellence Awards/
Transportation
-American Instituteof Consulting
Engineers (ACEC)
Santa Cruz RailTrailSegments 7 PHI,
7 PH2, 8-9, 10-n
Client & Location
Santo Cruz County Regional Transportation
Commission, Cityof Santa Cruz, County of
Santa Cruz in Santa Cruz, CA
The RRM Teams Involved
• Landscape Architecture
Key Features & Elements
• classiTrail,II,& IV trailbicyclefacilities
• Pedestrianbridgesat creekcrossings
• Retaining walls
• Trail amenities
• Stormwater drainage improvements
• At-grade railcrossings
• Contamintoted soilmanagement
• Public art
Project Timeline & Cost
• S7 PI: 2015-2020 - 8M
• S7 P2: 2015-2025 - 14M
• S8-9:2020-Present - 50M
• SlO-11:2021-Present -71M
A key transportationand recreationalcorridorisunderway within the rail right-of-wayowned by the Santa Cruz County RegionalTransportation Commission. RRM prepared the trailnetwork master and continues to assist multiplelead agencies with constructiondocumentation and overseeing implementation of criticalsegments of the corridorincludingSegment 7 and 8-9 forthe Cityof Santa Cruz and Segments 10-11 forthe County of Santa Cruz.Construction of the 1.3 mile firstphase of Segment 7 was completed in 2020 and the 0.8-miielong second phase opened to the publicearlierthis year.RRM iscurrentlypreparing construction documents for Segments 8 (0.6 miles),9 (1.6miles),10 (1.5miles),and 11 (3.2miles)for the Cityand County with close coordinate of the owner the Regional Transportation Commission.
Implementation of thiskey transportationcorridorwilllinkapproximately nine milesof neighborhoods, parks,localtrails,schools,employment centers, shopping districts,downtowns, and commuter routes.The pathways willprovide a saferactivetransportationalternativeto high trafficcorridorsand freeways, ill Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 46 115
Las Positas Multiuse Pathway
Client & Location
Cityof Santa Barbara, CA
The RRM Teams Involved
• Landscape Architecture
• CivilEngineering
• Surveying
Key Features & Elements
• Multiuse trait
• Retaining walls
• Midbtock crossings
• Three bike lanes
• At-grade trailcrossings
• Flood controlfacilities
• Creek restoration
• Sidewalk improvements
Project Timeline
• Design: 2016-2023
• Construction: 2022-2023
Project Cost
• ISM
The Cityof Santa Barbara hiredRRM Design Group to provide planning, environmental, and design servicesfor the Las PositasMultiuse Pathway, a 2.6-mileATP Grant Funded paved, separated, multiuse trailalong Las Positasand Modoc Roads and adjacent to Las Positasand Arroyo Burro Creek corridors. This trailconnection serves two vital links to the Cityof Santa Barbara's regionaltrailnetwork connecting the CaliforniaCoastal Trail and the City'sCross-town Route connecting downtown with the coastal route.
The traildesign includesmidblock crossingson Modoc Road, cycletrack facilities,and bikelanes,retainingwalls,floodcontrolfacilities,at-gradetrail crossings,and sidewalk improvements allowingcyclistsand pedestrians of allages and abilitiesto utilizethe pathway. New signalizedcrossings,creek restoration,and trailreaches,connection to Arroyo Burro State Beach, and connection to the City'snew roundabout at CliffDrive.This project provides a safe route for bicyclistsand pedestriansand improves access to surrounding neighborhoods, parks,and the beach, while the creek restoration helps to improve water quality,
lil Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 47 116
T\;' ■ ■ ■ ■1 '•’i'■
XT-:/;. ,
•r
* * %/ V•» :.:v*
A
.V :
• N-S'"
Santa Clarita Regional Commuter Trail
Client & Location
Cityof Santa Clarita,CA
The Cityof Santa Clarita,inan effortto provide alternativetransportation opportunitiesand expanded recreationalamenities forthe community, hired RRM Design Group to prepare ClassIMultiuse TrailAlignment Plans, bridge engineering plans,environmental documents and construction documents for the conversion of the abandoned Union Pacific railroad corridorand 100-year-old traintrestlebridge over the Santa Clara River into a regionalcommuter trail.The bicycleand pedestriantrail connects to the City'srichregionalmultiuse trailnetwork and provides new non-motorized transportationinfrastructureto connect residentsto one of the city'slargest employment centers,reducing vehiclemilestraveledand promoting healthier lifestyleoptions.RRM provided Federal Aid assistance,project management, multiuse trailplanning and design,civilengineering,landscape architecture, survey and construction administration.
The RRM Teams Involved
• Landscape Architecture
• CivilEngineering
• Planning
• Surveying
Key Features & Elements
• Multiuse Trail
• Bridge Work
Project Timeline
• Design: 2003-2009
Project Cost
• 2M
III Section3 |Qualifications\ ProposalForMultiuseActive Transportation TrailProject 48 117
'r
&
./'\;r •-
I r
Prince Memorial Greenwa Helen Putnam Award
for Excellence, Public
Works, Infrastructure,Enlistingwidespread community participation,RRM i Plan,design development plans and construction doi
Memorial Greenway. RRM's urban designers and lant
collaboratedwith a team of civilengineers,hydrolog
artiststo revitalizea concrete drainage channel intoa lush greenway and trailsystem. Afteran extensivepubliccollaboration,the design of the project emerged as a linearparkway with urban design,restorationand recreation elements, includinga multimodal ADA accessiblebike and pedestrian path, parks and plazas,publicsculptures,extensive restorationlandscapingand a naturalized creek bottom.
Transportation
- League of CaliforniaCities,2004
Client & Location
Cityof Santa Rosa, CA
The RRM Teams Involved
• Landscape Architecture
• Permitting Assistance
Key Features & Elements
• Multiuse TraiiDesign
• 0.6 Miles in Length
Project Cost
• 25M
m Sections|Qualifications| ProposalForMultiuseActive Transportation TrailProject 49 118
i V-- •
i-m
San Luis Rey River TraiiStudy and
Implementation
Client & Location
Cityof Oceanside, CA
The RRM Teams Involved
• CivilEngineering
• Landscape Architecture
• Permitting Assistance
Key Features & Elements
• Multiuse TrailDesign
• Project Management
Project Cost
• 7M
Working with the Cityof Oceanside, RRM Design Group's team provided preliminarydesign,engineering,environmental, and permitting servicesto prepare the preliminarydesign package, construction plans,specifications, and cost estimatesforthe San LuisRey RiverTrail.The projectIncluded developing an alignment study to assess potentialalternativesand then developing constructiondocuments to implement the trail.This easternmost trailsegment extends the existingClassIregionalbike path east along the San LuisRey River,thereby providinglocalcommunity access,extending existinguse to regionaltrailsystems and parkland at Guajome Regional Park, offeringfuture interpretiveopportunities,providingtrailheadparking for the east regionof the San LuisRey RiverTrailsystem, and connecting to the future siteof a new high school.The new reach alsoconnects to a ten-foot- wide equestriantrailextending access from Guajome Regional Park and the equestrian community east of State Highway 76 viaan existingbridge under crossing.
Ill Sections|Qualifications\ ProposalForMultiuseActive Transportation TrailProject 50 119
i •-
ri!
-s
»*-4'
..S,-L
}4rj
-^31
J y
•4
r4
o
; /iT
■^U
y
Conejo Creek Park Bike Trail
Client & Location
Cityof Thousand Oaks, CA
The RRM Teams Involved
• Landscape Architecture
• CivilEngineering
• StructuralEngineering
• Surveying
Key Features & Elements
• Equestrianpath
• Public outreach
Project Timeline
• Design: 2007-2009
• Construction: 2009-2011
Project Cost
• I.IM
Working with the Cityof Thousand Oaks, RRM Design Group's team provided preliminarydesign,engineering,environmental, and permitting services to prepare the preliminarydesign package, constructionplans,specifications, and cost estimates to develop the Conejo Creek Park Bike Path. This multiuse trailisdesigned to provide commuter cyclistsa directroute to the City's employment centerswhile increasingneighborhood accessto Conejo Creek RegionalPark,and isa key segment of the City'sbicyclenetwork and one of the criticalgap closureprojectsidentifiedinthe City'sBicycle Master Plan.The trailsystem alsoincludesa new equestrian path that is braided throughout the lengthof the corridorto linkthe City'ssurrounding equestrian neighborhoods together.The trailcrosses one of Ventura County's Flood Control channels and required significantcoordination and design innovationto successfullyadd a new bridge over the channel and created a dual use trailand serviceroad. With the projectnow completed, access to Conejo Creek Regional Park by foot and bike has increased dramatically, and overcrowded parking lotsare a distantmemory. RRM provided project management, publicoutreach, multiuse traildesign,civilengineering, landscape architecture,surveying,and permitting.
Ill SectionsjQualifications| ProposalForMultiuseActive Transportation TrailProject 51 120
121
Section Four:
Bill Rates
Prinne Bill Rates
Subconsultant Bill Rates
V u*.
■-
VhiWer Greenway TrailEast,Whittie,rCAs-
•X-
53 122
RRM BillRate Ranges
Subjectto change effectiveMarch 1steach year
ARCHITECTURE INTERIOR DESIGN
$ 54 $ 91 Desi|ner I- INTIntern $ 74 $ III
DesignerI- ARCH 83 $ III Designer II■ INT $ 90 $ 136
DesignerII-ARCH 90 $ 133 InteriorDesigner I $ 97 $ 144
DesignerIII•ARCH $ 108 $ 170 InteriorDesigner II $ 108 $ 172 Job Captain- ARCH 108 $ 170 InteriorDesigner III $ 128 $ 194 Architect 114 $ 174 SeniorInteriorDesigner $ 138 $ 215
ProjectDesigner - ARCH $ 126 $ 197
LANDSCAPE ARCHITECTUREProjectArchitect $ 126 $ 197
ProjectManager - ARCH 131 $ 212 Intern $ 54 $ 91
BIM Manager ■ ARCH $ 132 $ 233 AssistantDesigner ■ LAND $ 84 $ 119 QualityControl Manager -ARCH $ 151 $ 255 AssociateDesigner - LAND $ 93 $ 137 Senior Designer - ARCH 154 $ 248 Designer-LAND $ 105 $ 182 Senior Architect 154 $ 262 Landscape Architect $ 108 $ 175 Senior ProjectManager - ARCH 157 $ 269 SeniorLandscapeArchitect $ 132 $ 214 AssociateManager ofArchitecture 163 $ 251 PrincipalLandscape Architect $ 156 $ 252 Design Director-ARCH $ 183 $ 309 Design Director- LAND $ 159 $ 256 Manager ofArchitecture $ 189 $ 309 Manager of Landscape Architecture $ 165 $ 259 Director of Architecture $ 201 $ 330 Principal $ 207 $ 371 Principal $ 207 $ 371 Managing Partner $ 220 $ 442
$ 220 $ 442Managing Partner
PLANNING
ENGINEERING
CIVIL ENGINEERING
Intern 54 $ 91
Assistant Planner 98 $ 142
$ 91Intern $ 54 Associate Planner $ 117 $ 187
DesignerI- CIVIL $ 77 $ 107 Urban Designer ■ PLAN 117 $ 187 DesignerII- CIVIL $ 87 $ 138 Senior Planner 148 $ 227
Construction Inspector $ 102 $ 192 Senior Urban Designer - PLAN $ 148 $ 227 AssociateEngineer- CIVIL $ 129 $ 190 Supervisorof Planning& Urban Design $ 160 $ 244 Senior AssociateEngineer- CIVIL $ 146 $ 238 PrincipalPlanner 181 - $ 276 EngineerI-CIVIL $ 105 $ 159 Manager of Planning& Urban Design $ 194 $ 291 EngineerII■CIVIL $ 118 $ 186 Principal $ 207 $ 371
ProjectEngineer- CIVIL $ 142 $ 210 Managing Partner $ 220 $ 442 Senior ProjectEngineer- CIVIL $ 160 $ 262
ProjectManager - CIVIL $ 277 CORPORATE SERVICES$ 176
Manager of EngineeringServices- CIVIL $ 200 $ 317 Administrative Assistant $ 66 $ 108 Principal $ 207 $ 371 Administrative Coordinator $ 83 - $ 144 $ 220 OfficeManagerManaging Partner $ 442 $ 118 $ 179
SmCTURAL ENGINEERING CEO $ 276 $ 546
$ 91Intern $ 54 FileClerk/AdministrativeSupport $ 62 $ 93 Drafter I $ 77 $ 123 Marketing Assistant $ 60 $ 91
Drafter II $ 89 $ 139 Marketing Coordinator $ 77 $ 129
Drafter III $ 104 $ 153 Marketing Manager $ 140 $ 262
Senior Drafter $ 125 $ 202 Marketing Specialist $ 103 172 EngineerI-STRUCT $ 101 149 Office Coordinator $ 83 144
EngineerII- STRUCT $ 119 $ 186 BusinessDevelopment & PursuitsSupervisor $ 119 215 ProjectEngineer- STRUCT $ 142 $ 210 Receptionist $ 62 $ 93 SeniorProjectEngineer- STRUCT $ 159 261 SeniorMarketingSpecialist $ 118 $ 208 ProjectManager -STRUCT $ 170 $ 269
Manager of EngineeringServices-STRUCT $ 193 309
SURVEYING
Survey TechnicianI $ 78 119
$ 137Survey TechnicianII $ 90
Survey TechnicianIII $ 105 $ 182
PartyChief 108 $ 168
rSenior PartyChief $ 135 $ 217
Creating
Environments
People
Enjoy*
Land Surveyor 135 $ 203
SeniorLand Surveyor $ 159 $ 242
Supervisorof Surveying 171 $ 249
(jg designil group
Manager ofSurveying 180 $ 277
SURVEYING (Crew Rates)
REGULAR
One person w/ GPS or RoboticWorkstation 175 $ 230
Two person $ 240 $ 390
Three person $ 320 $ 495
PREVAILING WAGE
One person w/ GPS or RoboticWorkstation $ 270 $ 370
Two person $ 335 $ 380
Rev 3/1/2025
Three person $ 425 $ 610
III Section4 |BillRates\ProposalForMultiuseActive Transportation TrailProject 54 123
A V A N T
(. \ K D I
HOURLY RATE SCHEDULE
AVANT-GARDE offersthe following hourly rates.
..$170
$140
$125
.$110
.$100
Program Director
Program Manager
Senior Program Coordinator,
Program Coordinator
Program Assistant
Effectivethrough June 30, 2027
.$179
$147
Program Director
Program Manager
Senior Program Coordinator
Program Coordinator
Program Assistant
Effectivethrough June 30, 2029 $131
$116
$105
RailPros
OCMI,Inc.
$ 311.00Project Manger
Professional Rates
$ 411.20RailSpecialist
2026 2027
$170 $175
$185 $190
$ 295.45Civil Lead Cost Estimator I
Cost Estimator II
$ 264.35Traffic Lead
$201 $207Senior Estimator
$ 318.00Rail C&S Lead
$221 $228$ 233.25 Cost Manager
Senior Cost Manager
Sr. Engineer
$ 202.15Jr.Engineer
$258
$283
$298
$266Associate Director
Director
Senior Director
$ 158.61Sr.Designer $292
$307$ 124.40Admin/Jr. Designer
$361 $372Principal$ 404.30Rail/Tech Advisor
III Section4 |BillRates\ ProposalForMultiuseActive Transportation TrailProject 55 124
Fehr& Peers
2025-2026
(July2025 through June 2026)
Hourly BillingRates
Classification Hourly Rate
$280.00
$240.00
$215.00
$165.00
$140.00
$160.00
$125.00
$135.00
$120.00
$155.00
$100.00
Principal
$enior Associate
Associate
5enior Engineer/Planner
Engineer/Planner
$enior Engineering Technician
5enior Project Accountant
$enior Project Coordinator
Project Coordinator
Technician
Intern
$460.00
$335.00
$290.00
$240.00
$200.00
$255.00
$190.00
$225.00
$190.00
$195.00
$160.00
Other DirectCosts / Reimbursable Expenses are invoiced at cost plus 10% for handling.
Personal auto mileage is reimbursed at the current IRS approved rate (70 cents per mile as of Jan 2025).
Technology & SecurityFee (softwarelicensing,hardware upgrades, secure data storage,etc.)are invoiced and calculatedas a percentage of monthly project labor.
Fehr StPeers reserves the right to change these rates at any time with or without advance notice.
ill Section4 BillRates \ ProposalForMultiuseActiveTransportationTrailProject 56 125
ENG
P2S LP
RATE SCHEDULE FOR ENGINEERING SERVICES ON A
TIME AND EXPENSE BASIS
Category Rate
PRINCIPAL ENGINEER $365
ENGINEER GRADE 05
ENGINEER GRADE 04
ENGINEER GRADE 03
ENGINEER GRADE 02
ENGINEER GRADE 01
$308
$299
$256
$236
$209
DE5IGN ENGINEER GRADE 05
DE5IGN ENGINEER GRADE 04
DESIGN ENGINEER GRADE 03
DESIGN ENGINEER GRADE 02
DESIGN ENGINEER GRADE 01
$256
$236
$209
$185
$165
DESIGNER GRADE 04
DESIGNER GRADE 03
DESIGNER GRADE 02
DESIGNER GRADE 01
$176
$165
$151
$145
CAD/BIM DESIGNER GRADE 04
CAD/BIM DESIGNER GRADE 03
CAD/BIM DESIGNER GRADE 02
CAD/BIM DESIGNER GRADE 01
$146
$131
$118
$108
COMMISSIONING GRADE 05
COAAMISSIONING GRADE 04
COAAMISSIONING GRADE 03
COMMISSIONING GRADE 02
COMMISSIONING GRADE 01
$308
$268
$228
$182
$156
TECHNICAL WRITER
PROJECT ASSISTANT
$165
$108
In addition,for directout-of-pocket expenses (when they occur),we quote the following:
Automobile:1) at current IRS rote per mile from home office for travel outside Los Angeles, Orange, Son Diego, Son Bernardino, Riverside & King counties
at Cost
While away from home officefor more than 1 day: at
Cost,but not to exceed $275 per day per person,
at Cost plus 10% markup
at Cost plus 10% markup
2) Travel Expense:
Subsistence:3)
4) Plan Check Fees:
Third-Party Services:
• Printingand copy services
• Consultant and subcontract professionalfees
• Surveying/ SoilsInvestigation
• Testing Laboratory Work
5)
LIABILITY LIMITS
ProfessionalLiability
General Liability
$ 5,000,000.
$ 2,000,000.
EffectiveJanuary 1,2025 - December 31, 2025
RT-225
lii Section4 |BillRates\ ProposalForMultiuseActive Transportation TrailProject 57 126
GEOTECHNICAL PROFESSIONALS INC.
2025 FEE SCHEDULE
SERVICES RATE
$ 164.00/hr.
184.00/hr.
230.00/hr.
270.00/hr.
278.00/hr.
StaffEngineer/Geologist
ProjectEngineer/Geologist
Senior Engineer/Geologist
Associate
Principal
Senior Technician (Fieldor Lab)
Technician (Fieldor Lab)
AssistantTechnician (Fieldor Lab)
Cityof Los Angeles Deputy Grading Inspector
Technician - PrevailingWage Projects*
Technical Illustrator
Administrative Assistant
128.00/hr.
112.00/hr.
98.00/hr.
146.00/hr.
174.00/hr.
126.00/hr.
98.00/hr.
Legal Testimony and Depositions (4 hr.minimum) 420.00/hr.
Overtime and double-time fornon-prevailingand prevailingwage fieldstaffwillbe invoiced at 1.4 and 1.8 times the rate shown above, respectively.Overtime iswork on Saturday or on-sitetime over 8 hours on a normal workday. Double-time iswork on Sunday, holiday,or on-site time over 12 hours on a normal workday. Nightwork (work startingafter4:00 PM and before 4:00 AM) issubjectto an 8 hour minimum charge.
EQUIPMENT
$12.00/hr.
$0.80/mi.
$125.00/day
FieldVehicles with Test Equipment (traveland on-siteuse) Passenger Cars (mileage only)
Nuclear Gauge forAsphalt Concrete Testing
Other specialized equipment charges can be provided upon request.
EXPENSES & OUTSIDE SERVICES
Out-of-pocketexpenses (expendable fieldsupplies,aerialphotos, long distance calls, blueprints,reportproduction expenses, etc.)are charged at cost plus 15 percent.
Outside services (drilling,consultants, selected laboratory testing,geophysical surveys, etc.)are charged at cost plus 15 percent.
* For Projectssubject to a ProjectLabor Agreement (PLA), we willadd $15 per hour to the above rates for our Core Employees performing craftscovered by the PLA to account for the added union fringebenefitcosts.Since our Core Employees willnot work enough hours to receive the benefits,GPI’s benefitsare stillprovided to them.
GEOTECHfVjrCAL
PPOFESSIOMALS IfSiC
lii Section4 |BillRates\ ProposalForMultiuseActive Transportation TrailProject 58 127
IIGUIDA
9 ORANGE COUNTY |220 COMMERCE, SUITE 150,IRVINE,CA 92602 V. OFFICE (949)777-2000I ©WWW.GUIDAINC.COM
SOUTHERN CALIFORNIA | SURVEY AND MAPPING RATE SHEET
Rates effectiveJuly1,2025 through June 30, 2026
HOURLY RATES
LABOR DESCRIPTION HOURLY RATE
$320.00
$285.00
$255.00
$240.00
$205.00
$185.00
$165.00
$150.00
$150.00
$110.00
Principal
Senior Project Manager
Project Manager
Senior Project Surveyor
Project Surveyor
Senior Survey Analyst
Survey Analyst
Survey Technician
Project Coordinator
Survey Intern
Field Survey Rates (Prevallins Wage Applies)*
1-Person Survey Crew
2-Person Survey Crew
3-Person Survey Crew
UtilityLocate Manager
UtilityLocate Technician
*1-,2- and 3-person survey crews are inclusiveof survey vehicles,conventional and GPS survey equipment, and associatedsurvey tools,safetyequipment, etc.UtilityLocate Monoger/Technicion rate isinclusiveof vehicleand utilitylocatingequipment.
The Daytime Base Rate willbe charged for work beginning between Bam to 6pm Sunday through Saturday. Overtime willapply as applicable,see below.
***The Night Base Race willbe charged for work beginningbetween 6pm to Sam, Sunday through Saturday. Overtime willapply as applicable,see below.
DAY BASE RATE
$250.00
$420.00
$550.00
$250.00
$180.00
« «
NIGHT BASE RATE
$315.00
$525.00
$690.00
$315.00
$225.00
4 * *
MINIMUM HOURLY CHARGE (Prevailing wage ONLY)
Office classifications will be billed based on the hours worked, no minimum hourly charge. Fieldclassificationswill be billedon an hourly basis with a minimum of 4, 6, and 8 hours in accordance with prevailingwage requirements.
ESCALATION
Non-represented classificationswillescalateannuallybeginning July1,2026. Allfieldrateswillescalatein accordance with the InternationalUnion of Operating Engineers, Local 12.
OVERTIME
Straighttime willbe billedforallwork performed on-siteup to 8 hours each day,Monday through Friday.Overtime willbegin after8 hours,Monday through Fridayand on Saturdays.Double time willbegin after12 hours and on Sundays and holidays.
The overtime/double labor rateswillinclude:
Overtime (on-siteover 8 hours Aton-Friand Sat)
Sundays and Holidays
1.5 times the hourlybase rate
2.0 times the hourly base rate
SOUTHERN CALIFORNIA LOCATIONS
ORANGE COUNTY 220 Commerce, Suite 150. Iivine, CA 92602 INLAND EMPIRE 3536 Contours, Suite 201. Ontario, CA 92406 ( SAN DIEGO 380 State Place, Escondido, CA 92029 WWW.GUIDAINC.COM
6{»0A 2025 2IM« Southent Coiyormo Approred Hates fH6lalS0J2)l Oaa Pasp 1 of 2 lil Section4 |BillRates\ ProposalForMultiuseActive Transportation TrailProject 59 128
129
% -I
a
Section Five:
Project Schedule
• l- ' • '>
' cf,
Pictured: Tremont Street
IntersectionUrban Design,
Avalon, CA
61 130
Proposed Project Schedule
^ug 76 Sep'26 bet■26 Nov'26 bee'26 Jan'27 ^
21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24;31 7 14 2li28 5 12 19 26 2 |9 16i23 30 6 13t20 27 4 ^11 18 25 1 8 15:22 29 6 113 20 27| 3 !l0 17 24 31 ID Task Name Duration Start Finish Jan 26 Feb '26 Mar '26 Apr '26 May '26 Jul '26Jun '26 1 PAED & PS&E Duration
Pre-Design
Contract Received - Notice to Proceed Issued
Project Set Up & Sub Agreements
Conduct KickoffMeeting & Field Walk
Conduct AerialSurvey and Generate Topography
Conduct Vehicle, Bike. Pedestrian Counts
Collect Collision Data
220 days
30 days
Odays
5 days
0 days
25 days
15 days
5 days
Mon 1/5/26
Mon 1/5/26
Mon 1/5/26
Mon 1/5/26
Wed 1/14/26
Mon 1/12/26
Mon 1/26/26
Mon 2/9/26
Fri 11/6/26,
Fri2/13/26j
Mon 1/5/261 -U
Fri1/9/26!
Wed 1/14/26'
Fri2/13/261
Fri 2/13/26;
Fri2/13/26i
W
2 3
5|-AContractReceived-NoticetoProceedIssued
■project SetUp & Sub Agreements
1/14j^ConductKickoffMeeting&FieldWalk
i^^^HmPim-^ConductAerialSurveyandGenerateTopography
Conduct Vehicle, Bike, Pedestrian Counts
M CollectCollisionData
4 5
7 10 Preliminary Design
Prepare DraftSchematic Package
Conduct CPUC VirtualDiagnostic
Host Community Workshop #1 - Alignment Ideas
Prepare Revised Schematic Package
Prepare Cost Estimate
Conduct CPUC Field Diagnostic
HostCi
Prepare FinalSchematic Package
Prepare Cost Estimate
Prepare CEQA NOE Findings
StaffReport Preparation by City Staff
Present FinalSchematic Plan to CityCouncil
Post NOE @ County of Los Angeles County Clerk
72 days
20 days
0 days
0 days
22 days
10 days
0 days
Odays
12 days
5 days
5 days
5 days
0 days
0 days
Mon 2/16/26
Mon 2/16/26
Tue 3/3/26
Wed 3/18/26
Thu 3/19/26
Mon 4/6/26
Wed 4/15/26
Wed 4/22/26
Thu 4/23/26
Mon 5/4/26
Mon 5/4/26
Mon 5/11/26
Tue 5/19/26
Tue 5/26/26
Tue 5/26/26|
Fri3/13/26!
Tue 3/3/26i
Wed 3/18/26;
Fri4/17/26i
Fri 4/17/26
Wed 4/15/26|
Wed 4/22/26
Fri5/8/26!
Fri 5/8/261
Fri 5/8/26
Fri 5/15/26'
Tue 5/19/26!
Tue 5/26/26
11 repare Draft Schematic Package
uct CPUC VirtualDiagnostic
K Host Community Workshop - Alignment Ideas
-Prepare Revised Schematic Package
>repafe Cost Estimate
4/46^ Conduct CPUC FieldDiagnostic
4/22 Host Community Workshop #2 - Revised Schematic Plan Prepare Final Schematic Package
Prepare Cost Estimate
Prepare CEQA NOE Findings
■^taffReportPreparationbyCityStaff
^^resentFinalSchematicPlantoCityCouncil
5/26 ^ Post NOE @ County of Los Angeles County Clerk
12 3/3^a C.
13 3/18
14 15
16 17 lop #2 - Revised Schematic F
18 19
20 21
22 5/19
23 24
25 Final Design
Conduct Supplemental Sun/ey
Conduct Subsurface UtilitySurvey
Perform Geotechnical Investigation
Prepare 65% DraftConstruction Documents
Perform Q/VQC Review
Prepare Cost Estimate
Prepare Draft Stormwater Management Plan
City Plan Check of 65% CD's
Prepare 90% DraftConstruction Documents
Perform QA/QC Review
Prepare Cost Estimate
Prepare Final Stormwater Management Plan
City Plan Check of 90% CD's
Prepare 100% Draft Construction Documents
Perform QA/QC Review
Prepare Cost Estimate
City Back Check of 90% CD's
Prepare Bid-Ready Construction Documents
Submit Bid Set to City
126 days
5 days
todays
15 days
30 days
5 days
10 days
15 days
todays
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 5/11/26
Mon 6/15/26
Mon 6/15/26
Mon 6/8/26
Mon 6/29/26
Mon 7/13/26
Mon 8/10/26
todays Mon 8/10/26
10 days Mon 8/10/26
todays Mon 8/24/26
15 days
5 days Mon 9/21/26
todays Mon 9/21/26
todays Mon 10/5/26
todays Mon 10/19/26
Odays Mon 11/2/26
Mon 11/2/26
Fri 5/15/26
Fri 5/22/26
Fri 5/29/26
Fri 6/26/26
Fri 6/19/26
Fri 6/26/26
Fri 6/26/26
Fri 7/10/26
Fri 8/21/26
Fri 8/14/26
Fri 8/21/26
Fri 8/21/26
Fri 9/4/26
Fri 10/2/26
Fri 9/25/26
Fri 10/2/26
Fri 10/16/26
Fri 10/30/26
Mon 11/2/26
26 Conduct Supplemental Survey
B Conduct Subsurface UtilitySurvey
H ■ Perform Geotechnical Investigation
Prepare 65% Draft Construction Documents
>■ Pe form QA/QC Review
Prepare Cost Estimate
Prepare Draft Stormwater Management Plan
■K^City PlanCheck of65% CD's
27 28
29 30
31 32
33 34 Prepare 90% Draft Construction Documents
■Mi Pe form QA/QC Review
Prepare Cost Estimate
35 36
37 38
^ityPlanCheckof90% CD’s
Prepare 100% Draft Construction Documents
Perfomi QA/QC Review
.Prepare Cost Estimate
b^CityBackCheckof90%CD's
|-.Prepare Bid-Ready Construction Documents
X SubmitBidSettoCity
39 Mon 9/7/26
40 41
42 43
44 11/2
45 46 Project Coordination 220 days Mon 1/5/26
Ongoing ProjectCoordination,Management. & Meetit 220 days Mon 1/5/26 123 days Wed 3/4/26
Odays Fri10/2/26
65 days Mon 5/25/26
Fri 11/6/26
Fri 11/6/26
Fri 8/21/26
Fri 10/2/26
Fri 8/21/26
47 Ongoing Project Coordination, Management
48 Process GO 88-B Permit thru CPUC
GO 88-B Pennits Issued
UtilityCoordination
Process GO ermit thru CPUC
10/2> GO 88-B Permits Issued
50 UtilityCoordination
Project:Torrance ATP
Date: Fri 11/21/25
Design Team Activity Agency Activity Milestone ♦ Summary Progress lil Section5 |ProjectSchedule1 ProposalForMultiuseActive Transportation TrailProject 62 131
IntentionalBlank Page
132
■\
Ah ^ ^
r
1 ■ 1., # ,
> .
133
■■
■■
51. -• n
■'i^;■'>';
Section Six:
Appendix
Consulting Services Agreement Review
3F’*
ij-
V
r^4K 1.
.r.
'% >/'.•
r f
Pictured: Las Pastas Pathway, Santo Barbara, CA
64 134
Consulting Services Agreeement Review
RRM Design Group has reviewed the sample agreement, and we accept the terms of the agreement with the followingnoted adjustment to bringthe clause intocompliance with CivilCode Section 2782.8:
15. INDEMNIFICATION
To the extent allowed by CivilCode Section 2782.8, To-the fullest extent permitted by law. CONSULTANT shallIndemnify,defend and hold harmless Agency and any and allof itsofficials,officers,employees, agents, successors,and volunteers ("IndemnifiedParties")from and againstany and allclaims,actions,lawsuits, arbitrationproceedings,losses,liabilities,damages, costs and expenses, includingattorney'sfees and costs, to the extent they ariseout of,pertainto,or relateto the negligence,recklessness,or willfulmisconduct of the CONSULTANT. CONSULTANT'S duty to defend and indemnify any claim,action,lawsuit,or arbitration proceeding (collectively,"Claim")shallconsistof reimbursement of costs incurredby Agency indirect proportion to the CONSULTANT'S proportionate percentage of faultconcerningsuch Claim. Notwithstanding the previoussentencer-(i)inthe event one or more defendants isunable to pay itsshare of defense costs due to bankruptcy or dissolutionof the businessthen the design professionalshallmeet and confer with other partiesregardingunpaid defense costsand shallbe liableforany such defense costs allowableby law. consultant's duty to defend any Claim shallconsistof -reimbursement of alldefense costswhere a project- specificgener-afftabilitypolicyinsuresaH projectparticipantsforgeneral liabilityexposures on a primary basis and alsocovers alldesign professionalsfortheirlegalliabilityarisingout of theirprofessionalserviceson a pfimerfybasts: