SECTION 11 – Company Information
The following forms must be completed and submitted with your proposal.
Legal Entity of Company:
☐ Corporation State of: ________________
☐ Partnership State of: ________________
☐ General ☐ Limited
☐ Joint Venture
☐ Sole Proprietor ☐ Individual DBA: ________________ ☐ Limited Liability Company State of: ________________
Instructions Concerning Signatures
Please use the proper notary form, which applies to your type of organization on all proposal documents, attachments, and bonds requiring a signature by officers of your company.
Note: failure to comply may result in disqualification of your proposal.
Signature Guidelines
Individual (Doing Business As)
a. The only acceptable signature is the owner of the company. (Only one signature is required.) b. The owner’s signature must be notarized if the company is located outside of the state of California.
Partnership
a. The only acceptable signature(s) is/are that of the general partner or partners. b. Signature(s) must be notarized if the partnership is located outside of the state of California.
Corporation
a. Two (2) officers of the corporation must sign.
b. Each signature must be notarized if the corporation is located outside of the state of California.
OR
a. The signature of one officer or the signature of a person other than an officer is acceptable if the bid is accompanied by a certified corporate resolution granting authority to said person to execute contracts on behalf of the corporation.
b. Signature(s) must be notarized if the corporation is located outside of the state of California.
Limited Liability Company
a. The signature on the bid must be a member or, if the Articles provide for a manager, must be the manager. (Only one signature is required.)
b. Signature must be notarized if the company is located outside of the state of California.
Missouri
164
Design-Build Construction for a Parking Structure at the Torrance Regional Transit Center
Business Information & Agreement Authorization Form
Section 1: Business Information
Business Name: ____________________________________________ Legal Entity Type: ☐ Corporation ☐ LLC ☐ Partnership ☐ Sole Proprietor ☐ Other: ____________ Business Address: ____________________________________________ City, State, ZIP: ____________________________________________ Phone Number: _______________________ Fax: __________________________ Email Address: ____________________________________________ Website (if applicable): ____________________________________________ Federal Tax ID (EIN) / SSN (if Sole Proprietor): ____________________________ State of Incorporation / Registration: ____________________________________________ Date Established: ____________________________________________ Section 2: Contractor Information
Public Works Registration (PWCR) Number: __________________________________________________
Contractor’s License No.: ______________________ Class: ________________________
Date first obtained: __________________________
Has the License ever been suspended or revoked? ________________
If yes, describe when and why _________________________________________________
Are there any current claims against the License or Bond? _________________
If yes, describe claims: __________________________________________________
Principals in Company (List all - attach additional sheets if necessary):
NAME TITLE LICENSE NO. (If Applicable)
__________________________ _________________________ __________________
__________________________ _________________________ __________________
__________________________ _________________________ __________________
Design-Build Construction for a Parking Structure at the Torrance Regional Transit Center
Business Information & Agreement Authorization Form
Section 1: Business Information
Business Name: ____________________________________________ Legal Entity Type: ☐ Corporation ☐ LLC ☐ Partnership ☐ Sole Proprietor ☐ Other: ____________ Business Address: ____________________________________________ City, State, ZIP: ____________________________________________ Phone Number: _______________________ Fax: __________________________ Email Address: ____________________________________________ Website (if applicable): ____________________________________________ Federal Tax ID (EIN) / SSN (if Sole Proprietor): ____________________________ State of Incorporation / Registration: ____________________________________________ Date Established: ____________________________________________ Section 2: Contractor Information
Public Works Registration (PWCR) Number: __________________________________________________
Contractor’s License No.: ______________________ Class: ________________________
Date first obtained: __________________________
Has the License ever been suspended or revoked? ________________
If yes, describe when and why _________________________________________________
Are there any current claims against the License or Bond? _________________
If yes, describe claims: __________________________________________________
Principals in Company (List all - attach additional sheets if necessary):
NAME TITLE LICENSE NO. (If Applicable)
__________________________ _________________________ __________________
__________________________ _________________________ __________________
__________________________ _________________________ __________________
McCarthy Building Companies, Inc.
515 S. Flower St. Suite 3600
Los Angeles, CA 90017
(213) 655 -1100 N/A
[email protected]
No
No
Not Applicable
Not Applicable
Ray Sedey N/AChairman & Chief Executive Officer
Joseph Jouvenal N/AChief Operating Officer
Matthew Lawson N/AChief Legal Officer
Danel Dilon N/ATreasurer
Kristine Newman N/AChief Financial Officer
1000001840
www.mccarthy.com
Missouri
43-0399290
March 23, 1907
411173 A, B, C4, C8, C10, C20, C36, C-61/D56
August 31, 1981
165
Design-Build Construction for a Parking Structure at the Torrance Regional Transit Center
Section 3: Business Contact Information
Primary Contact Name: ____________________________________________ Title: ____________________________________________
Phone Number: _______________________ Email: __________________________ Secondary Contact (if applicable): ____________________________________________ Title: ____________________________________________
Phone Number: _______________________ Email: __________________________ Section 4: Authorization & Signature
By signing below, the authorized representative confirms that the information provided is accurate and complete. The representative also acknowledges that entering into this agreement is subject to the terms and conditions set forth by both parties.
Authorized Representative Name: ____________________________________________ Title: ____________________________________________
Signature: _____________________________________ Date: ________________ For Internal Use (Authorized by Receiving Party)
Company Representative Name: ____________________________________________ Title: ____________________________________________
Signature: _____________________________________ Date: ________________ Section 5: Addenda Acknowledgment
Acknowledgment of receipt of any addenda issued by the city is required and the acknowledgment must be included with your bid. Failure to acknowledge the Addenda issued may result in your Bid being deemed non-responsive. In the space provided below, please acknowledge receipt of each Addenda.
If additional Addenda were issued, please attach a separate sheet.
By signing below, the Bidder confirms that they have received, reviewed, and incorporated the information contained in the above-referenced Addenda into their Bid submission.
Authorized Representative Signature: ____________________________ Printed Name: ___________________________________________ Title: _________________________________________________ Date: _________________________________________________ Addendum Number Date Issued Acknowledgment (Initials)
Addendum #1 __________ __________
Addendum #2 __________ __________
Addendum #3 __________ __________
Addendum #4 __________ __________
Addendum #5 __________ __________
Michael Kim
Michael Kim
Michael Kim
Andrew Raufi
Vice President, Project Executive
(949) 375-3610 [email protected]
Senior Vice President
Senior Vice President
Senior Vice President
March 27, 2026
March 27, 2026
1/23/2026 MK
1/30/2026 MK
1/27/2026 MK
2/18/2026
3/19/2026
3/23/2026Addendum #6
MK
MK
MK
(310) 291-1012 [email protected]
166
167
01 Technical Approach &
Project Understanding
APPENDIX 2
Drawings
168
APPENDIX 2 - DRAWINGS
Architectural
Floorplans
169
170
171
172
173
174
APPENDIX 2 - DRAWINGS
Architectural
Elevations
175
GROUND LEVEL
0.00'
SECOND LEVEL
11.33'
THIRD LEVEL
21.50'
FOURTH (ROOF) LEVEL
TOP OF PARAPET
2 1
34 7
8 9
10 11
GROUND LEVEL
0.00'
SECOND LEVEL
11.33'
THIRD LEVEL
21.50'
FOURTH (ROOF) LEVEL
TOP OF PARAPET
3 4
10 11
91 109
GROUND LEVEL
0.00'
SECOND LEVEL
11.33'
THIRD LEVEL
21.50'
FOURTH (ROOF) LEVEL
TOP OF PARAPET
5 628
11 119
GROUND LEVEL
0.00'
SECOND LEVEL
11.33'
THIRD LEVEL
21.50'
FOURTH (ROOF) LEVEL
134 61
1011
6 SHEET NOTE
1. FLOOR ELEVATIONS SHOWN ARE TO THE TOP OF STRUCTURAL
SLAB UNLESS OTHERWISE NOTED.
2. COORDINATE STRUCTURAL WITH SPRINKLER DESIGN AND
LAYOUT. PROVIDE SLEEVE LOCATION(S) AS NECESSARY.
3. PROVIDE MEDIUM BROOM FINISH OVER CONCRETE WHERE
ELASTOMERIC COATING OCCURS.
EXTERIOR MATERIAL LEGEND
1 ACM, SILVER
2 ACM, BROWN
3 CORRUGATED METAL PANEL, VERTICAL, GREY
4 5
6 PERFORATED METAL PANEL (WITH SIGNAGE LOGO)
7 TILE (WITH ACCENT SHEET METAL)
8 STOREFRONT
9 CMU
10 PAINTED CONCRETE, BROWN YELLOW
11 CORRUGATED METAL PANEL, HORIZONTAL, LIGHT GREY
CORRUGATED METAL PANEL, HORIZONTAL, WHITE (WITH ACCENT SHEET METAL)
PAINTED CONCRETE, DARK GREY
SCALE: 1/16" = 1'-0"1 SOUTH ELEVATION
SCALE: 1/16" = 1'-0"4 WEST ELEVATION
SCALE: 1/16" = 1'-0"2 EAST ELEVATION
SCALE: 1/16" = 1'-0"3 NORTH ELEVATION
Drawing No.
AA33..0011
BUILDING
ELEVATIONS
176
APPENDIX 2 - DRAWINGS
Structural Plans
177
1 252 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 426'-0"
15'-0" 15'-0"18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" D
C
B
A
C.7
C.3
B.8
B.2
A.6
A.2
19'-0" 23'-0" 23'-0" 18'-0" 29'-0" 18'-0" 23'-0" 23'-0" 19'-0"
RAMP UP
D
C
B
A
C.6
C.2
B.8
B.2
A.7
18'-0" 18'-0" 18'-0" 18'-0" 29'-0" 18'-0" 18'-0" 47'-0" 195'-0"
65'-0" 65'-0" 65'-0"
C.9
11'-0"
A
S2.01
D
5'-0"2'-0"
B U S L A N E
SECTION
NO SCALE
A
S2.01
Drawn By
Drawing Title
Drawing No.
Checked By
Scale
IPD Job No.
Date
Revision Date
Architecture / Planning / Consulting
Oakland
Orange County
www.ipd-global.com
General Contractor:
Architect:
Consultant:
Stamp / Seal:
2 South Pointe, Suite 295, Lake Forest CA 92630
Phone 949 595 8004 Fax 949 595 8011
Consultant:
PARKING STRUCTURE
Torrance, California
20401 S.W. BIRCH STREET SUITE 300
Newport Beach, California 92660
03/27/26
Consultant:
(530) 894-5345
CHICO, CALIFORNIA 95973
100 AMBER GROVE DRIVE, SUITE 109
www.jwsestructural.com
S T R U C T U R A L E N G I N E E R S
0'
SCALE: 1/16"=
AS SHOWN
GROUND LEVEL
FLOOR PLAN
S2.01
1'-0"
32'16'8'16'
GROUND LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
178
SECTION AT GRID A (ALTERNATE)
NO SCALE
A
S2.02
A
1 252 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 15'-0" 15'-0"18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" D
C
B
A
C.7
C.3
B.8
B.2
A.6
A.2
19'-0" 23'-0" 23'-0" 18'-0" 29'-0" 18'-0" 23'-0" 23'-0" 19'-0" 426'-0"
RAMP UPRAMP DN
A
S2.02
5'-6"
D
C
B
A
C.6
C.2
B.8
B.2
A.7
18'-0" 18'-0" 18'-0" 18'-0" 29'-0" 18'-0" 18'-0" 47'-0" 195'-0"
65'-0" 65'-0" 65'-0"
C.9
11'-0"
Drawn By
Drawing Title
Drawing No.
Checked By
Scale
IPD Job No.
Date
Revision Date
Architecture / Planning / Consulting
Oakland
Orange County
www.ipd-global.com
General Contractor:
Architect:
Consultant:
Stamp / Seal:
2 South Pointe, Suite 295, Lake Forest CA 92630
Phone 949 595 8004 Fax 949 595 8011
Consultant:
PARKING STRUCTURE
Torrance, California
20401 S.W. BIRCH STREET SUITE 300
Newport Beach, California 92660
03/27/26
Consultant:
(530) 894-5345
CHICO, CALIFORNIA 95973
100 AMBER GROVE DRIVE, SUITE 109
www.jwsestructural.com
S T R U C T U R A L E N G I N E E R S
0'
SCALE: 1/16"=
AS SHOWN
SECOND LEVEL
FLOOR PLAN
S2.02
SECOND LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
16' 8' 16' 32'
1'-0"
179
1 252 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 15'-0" 15'-0"18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" D
C
B
A
C.7
C.3
B.8
B.2
A.6
A.2
19'-0" 23'-0" 23'-0" 18'-0" 29'-0" 18'-0" 23'-0" 23'-0" 19'-0" 426'-0"
RAMP UPRAMP DN
A
S2.02
D
C
B
A
C.6
C.2
B.8
B.2
A.7
18'-0" 18'-0" 18'-0" 18'-0" 29'-0" 18'-0" 18'-0" 47'-0" 195'-0"
65'-0" 65'-0" 65'-0"
C.9
11'-0"
Drawn By
Drawing Title
Drawing No.
Checked By
Scale
IPD Job No.
Date
Revision Date
Architecture / Planning / Consulting
Oakland
Orange County
www.ipd-global.com
General Contractor:
Architect:
Consultant:
Stamp / Seal:
2 South Pointe, Suite 295, Lake Forest CA 92630
Phone 949 595 8004 Fax 949 595 8011
Consultant:
PARKING STRUCTURE
Torrance, California
20401 S.W. BIRCH STREET SUITE 300
Newport Beach, California 92660
03/27/26
Consultant:
(530) 894-5345
CHICO, CALIFORNIA 95973
100 AMBER GROVE DRIVE, SUITE 109
www.jwsestructural.com
S T R U C T U R A L E N G I N E E R S
0'
SCALE: 1/16"=
AS SHOWN
THIRD LEVEL
FLOOR PLAN
S2.03
THIRD LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
16' 8' 16' 32'
1'-0"
180
PLAN-SECTION AT ELEVATOR ROOF
NO SCALE
A
S2.04
PLAN-SECTION AT ELEVATOR ROOF
NO SCALE
B
S2.04
1 252 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 15'-0" 15'-0"18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" D
C
B
A
C.7
C.3
B.8
B.2
A.6
A.2
19'-0" 23'-0" 23'-0" 18'-0" 29'-0" 18'-0" 23'-0" 23'-0" 19'-0" 426'-0"
RAMP DN
A
S2.02
PLAN-SECTION AT STAIR ROOF
NO SCALE
C
S2.04
D
C
B
A
C.6
C.2
B.8
B.2
A.7
18'-0" 18'-0" 18'-0" 18'-0" 29'-0" 18'-0" 18'-0" 47'-0" 195'-0"
65'-0" 65'-0" 65'-0"
C.9
11'-0"
1 2
A
Drawn By
Drawing Title
Drawing No.
Checked By
Scale
IPD Job No.
Date
Revision Date
Architecture / Planning / Consulting
Oakland
Orange County
www.ipd-global.com
General Contractor:
Architect:
Consultant:
Stamp / Seal:
2 South Pointe, Suite 295, Lake Forest CA 92630
Phone 949 595 8004 Fax 949 595 8011
Consultant:
PARKING STRUCTURE
Torrance, California
20401 S.W. BIRCH STREET SUITE 300
Newport Beach, California 92660
03/27/26
Consultant:
(530) 894-5345
CHICO, CALIFORNIA 95973
100 AMBER GROVE DRIVE, SUITE 109
www.jwsestructural.com
S T R U C T U R A L E N G I N E E R S
0'
SCALE: 1/16"=
AS SHOWN
FOURTH LEVEL
FLOOR PLAN
S2.04
FOURTH LEVEL FLOOR PLAN
SCALE: 1/16" = 1'-0"
16' 8' 16' 32'
1'-0"
181
APPENDIX 2 - DRAWINGS
Civil Improvement Plan
182
183
APPENDIX 2 - DRAWINGS
Façade Design
Renderings
184
KEY P LAN
MAIN ARRI VAL
TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 185
VIEW FROM STATION
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE
PAINT ED CO NCRE TE
186
KEY P LAN
MAIN ENTRY VI EW F ROM PLAZA
TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 187
CONTEXTUAL
SO UTH PER SPEC TIVE
EXI ST ING C ONTEXT
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 188
PERFORATED METAL WITH LOGO
CORRUGATED METAL TYPE 1 - WHITE
CORRUGATED METAL TYPE 2 CORRUGATED METAL TYPE 1
PERIMETER LIGHTING
TILE + ACCENT BAND
STOREFRONT
PV CANOPY
ACM PANEL – BROWN
PAINTED CONC - GREY
ACM PANEL - GREY
PAINTED CONC – LIGHT TAN
CMU
MATERIALS
TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 189
FRONT VIEW ON M AIN E NTRY
KEY PLAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 190
VIEW FROM W 2 08 ST
TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE
KEY PLAN
191
VIEW FROM STATION
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 192
ENTRY VI EW
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 193
PLAZA VI EW
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 194
Dusk sh otVIEW FROM W 2 08 ST
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 195
CONTEXTUAL Dusk sh ot
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 196
KEY P LAN
TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE
PEDE STRI AN CO RRI DO R
NEW
CANOPY
, +12’H
EXISTING
CANOPY
, +
-
24’H
ELEVATOR TOWER
PEDESTRIAN CORRIDOR
VIEW UNDE R CANO PY
*
*
197
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE
ELEVATOR LOBBY AT GROUND L EVEL
198
ELEVATOR LOBBY AT ROOF LEVEL
KEY P LAN TORRAN CE R EGIONAL TR AN SIT CENTE R P AR KING STR UCTU RE 199
CITY OF TORRANCE
Torrance Regional
Transit Center
Parking Structure
M c CARTHY | IPD − RFP RESPONSE
200
City of Torrance Standard Form of Agreement Between Owner and Design-Builder Page 18 EXHIBIT 4
APPROVED CLARIFICATIONS, ASSUMPTIONS, AND DEVIATIONS
AND SCHEDULE OF VALUES
201
Torrance Regional Transit Center Parking Structure Date: 06/25/26 Total Design-Build Estimate Summary Table
RFP Base Bid $27,983,702
Add Surface Lot $3,151,488
Add PARCS Gates & Paystation to Surface Lot $90,033
Remove Code Blue Emergency Phones ($80,200)
Premium for Multi-Color Lighting @ both TRTC Logos $6,834 LPR System $55,367
Add Anti-Graffiti Coating $6,000
Add Builders Risk Policy $185,174
Deduct Testing & Inspection (from Base Bid) ($319,000)
Allowance for SCE Fees $100,000
Allowance for School District Impact Fees $266,437
Total Scope Additions $3,462,133
Subtotal RFP Base Bid + Scope Additions $31,445,835
Full CCTV Camera Coverage within PS 38 CCTV Cameras included throughout parking structure ERRCS DAS (Full System) $216,528
Cellular DAS (Infrastructure Only) $87,282
Cellular DAS (Full System; excludes infrastructure) $912,509 Total PS Cost + Surface Lot + All Alternates $32,662,153 Pricing Assumptions
1. Testing and Inspections
2. Division 11 - Equipment
3. Division 28 - Electronic Safety and Security
4. Division 28 - Electronic Safety and Security
5. Division 32 - Exterior Improvements
6. Division 32 - Exterior Improvements
7. Division 32 - Exterior Improvements
8. Division 32 - Exterior Improvements
9. Division 32 - Exterior Improvements
10. Division 32 - Exterior Improvements
We have assumed that a layer of up to 4" thick of topsoil will need to be removed from existing surface lot site.
We have assumed an R-value of 20 for design of asphalt paving and portland cement concrete paving at surface lot.
Testing and inspection for surface lot work is assumed to be the responsibility of the Owner or Construction Manager.
RFP Base Bid
Scope Changes
Alternates
Pricing Assumptions (Surface Lot)
Description
We have included an Alternate add to provide Parking Access and Revenue Control System (PARCS) with 3 gates at south entry lane and north entry and exit lanes and one pay-on-foot station with credit card payment processing.
We have included 600A main electrical service at the surface lot for lighting and EV chargers at parking areas.
EV charging station (EVCS) devices will be furnished and installed to serve 12 stalls at surface lot per Table 5.106.5.3.1 CalGreen EVSE requirement for a project containing 138 total stalls.
We have included 142 stalls at surface parking lot.
We have assumed two sets of entry/exit driveways will provide adequate fire truck route access without requiring a third driveway location.
We have not included loading docks, service/trash truck access requirements, pad, improvements, utilities, nor any provisions for a future development.
We have assumed that the existing concrete paving at the drive approach between Crenshaw Blvd. and proposed southern entry to surface lot is at least Traffic Index 7 to accommodate fire truck loading.
EXHIBIT 4
202
Pricing Assumptions
1. Contract Terms
2. Geotechnical
3. Builder's Risk
4. Self Perform Scopes
5. Temporary Utilities
6. Permitting
7. Testing and Inspections
8. Division 03 - Concrete
9. Division 10 - Specialties
10. Division 11 - Equipment
11. Division 11 - Equipment
12. Division 21 - Fire Suppression
13. Division 21 - Fire Suppression
14. Division 23 - HVAC
15. Division 26 - Electrical
16. Division 26 - Electrical
17. Division 26 - Electrical
18. Division 26 - Electrical
19. Division 26 - Electrical
20. Division 26 - Electrical
21. Division 26 - Electrical
22. Division 26 - Electrical
23. Division 28 - Electronic Safety and Security
24. Division 28 - Electronic Safety and Security A Fire Alarm System in compliance with all Code requirements as been included.
It has been assumed that no fire booster pump will be required, and therefore one has not been included.
We have included split-system HVAC units at all Electrical, IDF, and Elevator Machine rooms.
We have assumed that electrical service has adequate capacity to serve the parking structure and it is acceptable to locate the new transformer along north side of parking structure in lieu of routing shown per RFP sheet E1.01. See proposed utilities on provided Civil site plan.
As required by CalGreen, we have included all infrastructure to support 200 EV capable stalls to comply with the 20% requirement.
EV charging station (EVCS) devices will be furnished and installed to serve 50% of EV capable stalls (100 stalls) per CalGreen EVSE requirement.
The proposed EV alternate will provide installation of charging devices serving all remaining EV capable stalls (100 stalls).
Infrastructure for a distributed antenna system (DAS) for Emergency Responder Radio Communication System (ERRCS) has been included. Testing, design, and installation of a DAS has not been included but an alternate cost has been provided.
The alternate cost for PV Canopy Installation includes a "turn key" PV system and support structure at the interior only of roof level with output of 330 KW-dc.
A public WiFi system has not been included, and is assumed not to be required. An alternate cost has been provided to add a public WiFi system.
We have assumed the City will be responsible for any fees and coordination associated with additional scopes required by SCE or other utility companies beyond coordination of points of connection with the parking structure. This includes the cost of routing electrical service to the parking structure limits of work. McCarthy will assist in any coodination efforts as necessary to provide design and load information to support this design. A CCTV camera system has been included with 38 camera devices throughout the structure at entries/exits, elevators, drive aisles, and stair areas to meet the appropriate industry standard for a public parking facility.
Pricing Assumptions (PS & Misc.)
A code-compliant sprinkler and standpipe system has been included.
This lump sum proposal is subject to mutually agreeable terms and conditions.
We have assumed that the Project Site has been treated in accordance with the Geotechnical report prepared by Diaz Yourman & Associates dated April 4, 2014, and all required remediation has taken place during the previous construction of the existing surface parking lot with documentation as necessary. We have further assumed that any over-excavation requirements will be performed to a depth of 2’-0” below footings as detailed in the above-referenced report.
Builder’s risk insurance coverage has been included under scope additions.
This proposal is based upon McCarthy self-performing structural concrete, earthwork, site utilities, and façade scopes of work.
It has been assumed that all usage fees for temporary power, water and other utilities will be paid directly by The City.
All entitlements, environmental review, special permitting, and associated costs, are assumed to be the responsibility of The City.
An deduct has been provided under the scope changes section to remove the cost of testing and inspection of the parking structure work outlined in the original RFP, which is assumed to be the responsibility of the Owner or Construction Manager.
All concrete surfaces within the interior of the parking structure including slabs, beams, soffits, walls, columns, etc. are assumed to be exposed concrete.
All code-required signage has been included. Additional wayfinding and signage programs are assumed to be others, unless stated otherwise.
Parking access and revenue control gates are included at vehicular entry and exit lanes with one (1) pay-on-foot station at ground level with credit card payment processing.
Parking guidance system for total level-by-level stall counting is included with digital signs at bottom of ramps displaying the number of available spaces at level above. Two tower signs outside vehicular entries will display the number of available spaces at each level.
Description
203
25. Division 31 - Earthwork
26. Division 31 - Earthwork
27. Division 31 - Earthwork
28. Division 32 - Exterior Improvements
30. Division 33 – Utilities
31. Division 33 – Utilities
We have assumed that sewer and fire water connects to existing lateral stub-out from W. 208th Street, and domestic water connects via new trench to existing mainline at W. 208th Street. See proposed Civil site plan for reference.
The provided geotechnical report dated 6-13-2013 does not specify the current moisture content or the optimum moisture content. Therefore, it is assumed that the existing soil is above optimum moisture content and will not require any moisture conditioning.
No shrinkage factor has been specified in the provided geotechnical report, therefore we have assumed 5%.
No swell factor has been specified in the provided geotechnical report, therefore we have assumed 10%.
We have assumed space can be allocated within the future site development or existing campus for additional short and long term bicycle parking, if required.
We have assumed creating a new easement is viable to allow cross-lot drainage so that a single LID system for stormwater detention and treatment can be located within the surface lot parcel to service both the lot and the parking structure parcels. 204
City of Torrance Standard Form of Agreement Between Owner and Design-Builder Page 19 EXHIBIT 5
TRTC SCHEDULE
205
Activity ID Activity Name Orig Dur Start Finish
T orrance Regional Transit Center Parking StructureT orrance Regional Transit Center Parking Structure 446d 1 1-May-26 15-Feb-28 Project Summary and MilestonesProject Summary and Milestones 446d 1 1-May-26 15-Feb-28 PS 250 Award Projects 1d 1 1-May-26 1 1-May-26
PS 230 Execute Contract 24d 12-May-26 15-Jun-26
PS 240 Board Approval 24d 16-Jun-26 20-Jul-26
PS 1 10 Total Project Duration (Workdays) 377d 21-Jul-26 18-Jan-28 PS 210 Total Project Duration (Calendar days) 547d 21-Jul-26 18-Jan-28 Design and Permitting SummaryDesign and Permitting Summary 140d 21-Jul-26 09-Feb-27 PS 120 Design & Permitting Duration - SMR 125d 21-Jul-26 19-Jan-27 A3890 Notice to Proceed 0d 21-Jul-26*
PS 220 Design & Permitting Duration - Building 140d 21-Jul-26 09-Feb-27 A3900 Submit for Plan Check - SMR 0d 22-Sep-26
A4150 Submit for Plan Check - Building 0d 13-Oct-26
A4440 Permit - Surface Parking Lot 0d 03-Nov-26
A3910 Permit - SMR 0d 19-Jan-27
A4160 Permit - Building 0d 09-Feb-27
Construction SummaryConstruction Summary 272d 20-Jan-27 15-Feb-28 A4010 Mobilize / Start Construction 0d 20-Jan-27
PS 130 Construction Duration 242d 03-Feb-27 18-Jan-28
PS 140 Earthwork & Site Make Ready 25d 03-Feb-27 09-Mar-27 A3920 Building Pad Certification 0d 09-Mar-27
PS 150 Foundation to Start of Decks 36d 10-Mar-27 28-Apr-27 A3930 Foundations Complete 0d 08-Apr-27
PS 160 Start of Decks to Concrete Top Out 80d 29-Apr-27 20-Aug-27 A3940 Slab on Grade Complete 0d 12-May-27
A3950 Top Out Elevated Decks 0d 20-Aug-27
PS 180 Concrete Top Ou t to Substantia l C omp leti on 101d 23-Aug-27 18-Jan-28 A3960 Permanent Power 0d 13-Sep-27
PS 170 Elevator Summary 40d 21-Sep-27 16-Nov-27
A3970 Start Elevator Construction 0d 21-Sep-27
A3980 Anticipated Completion Prior to Weather Allowance 0d 27-Dec-27 PS 200 Inclement Weather Allowance 15d 28-Dec-27 18-Jan-28 A3990 Substantial Completion 0d 18-Jan-28
PS 190 Project Closeout 20d 19-Jan-28 15-Feb-28
A4000 Final Completion 0d 15-Feb-28
PreconstructionPreconstruction 289d 21-Jul-26 09-Sep-27 Design & PermittingDesign & Permitting 140d 21-Jul-26 09-Feb-27 Surface Parking LotSurface Parking Lot 75d 21-Jul-26 03-Nov-26 DesignDesign 45d 21-Jul-26 22-Sep-26
A4250 Design Kickoff Meeting 1d 21-Jul-26 21-Jul-26
A4360 Prepare 100% Schematic Design Documents - Surface Parking Lot 15d 21-Jul-26 10-Aug-26 A4260 Prepare 100% Design Development Documents - Surface Parking Lot 15d 1 1-Aug-26 31-Aug-26 A4370 Owner Review / Comment on 100% Schematic Design Documents - Surface Parking Lot 5d 1 1-Aug-26 17-Aug-26 A4270 Owner Review/ Comment on 100% Design Development Documents - Surface Parking Lot 5d 01-Sep-26 08-Sep-26 A4280 Prepare 100% Construction Documents - Surface Parking Lot 15d 01-Sep-26 22-Sep-26 A4290 Package and Submit 100% Construction Documents to AHJ - Surface Parking Lot 3d 18-Sep-26 22-Sep-26 PermittingPermitting 30d 23-Sep-26 03-Nov-26
A4300 AHJ Initial Plan Check Review - Surface Parking Lot 10d 23-Sep-26 06-Oct-26 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
Award Projects
Execute Contract
Board Approval
Total Project Duration (Workdays)
Total Project Duration (Calendar days)
Design & Permitting Duration - SMR
Notice to Proceed
Design & Permitting Duration - Building
Submit for Plan Check - SMR
Submit for Plan Check - Building
Permit - Surface Parking Lot
Permit - SMR
Permit - Building
Mobilize / Start Construction
Construction Duration
Earthwork & Site Make Ready
Building Pad Certification
Foundation to Start of Decks
Foundations Complete
Start of Decks to Concrete Top Out
Slab on Grade Complete
Top Out Elevated Decks
Concrete Top Ou t to Substantia l C omp leti on
Permanent Power
Elevator Summary
Start Elevator Construction
Anticipated Completion Prior to Weather Allowance
Inclement Weather Allowance
Substantial Completion
Project Closeout
Final Completion
Design Kickoff Meeting
Prepare 100% Schematic Design Documents - Surface Parking Lot Prepare 100% Design Development Documents - Surface Parking Lot Owner Review / Comment on 100% Schematic Design Documents - Surface Parking Lot Owner Review/ Comment on 100% Design Development Documents - Surface Parking Lot Prepare 100% Construction Documents - Surface Parking Lot Package and Submit 100% Construction Documents to AHJ - Surface Parking Lot AHJ Initial Plan Check Review - Surface Parking Lot
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
EXHIBIT 5
206
Activity ID Activity Name Orig Dur Start Finish
A4310 DBE Response to AHJ Plan Check Review Comments - Su rface Parking Lot 5d 07-Oct-26 13-Oct-26 A4340 AHJ Second Plan Check Review - Surface Parking Lot 10d 14-Oct-26 27-Oct-26 A4330 Obtain Building Permit - Surface Parking Lot 5d 28-Oct-26 03-Nov-26 Site Make-Ready PackageSite Make-Ready Package 125d 21-Jul-26 19-Jan-27 DesignDesign 45d 21-Jul-26 22-Sep-26
A4020 Design Kickoff Meeting 1d 21-Jul-26 21-Jul-26
A4170 Prepare 100% Schematic Design Documents - SMR 15d 21-Jul-26 10-Aug-26 A4050 Prepare 100% Design Development Documents - SMR 15d 1 1-Aug-26 31-Aug-26 A4180 Owner Review / Comment on 100% Schematic Design Doc uments - SMR 5d 1 1-Aug-26 17-Aug-26 A4060 Owner Review/ Comment on 100% Design Development Do cuments - SMR 5d 01-Sep-26 08-Sep-26 A4070 Prepare 100% Construction Documents - SMR 15d 01-Sep-26 22-Sep-26 A4080 Package and Submit 100% Construction Documents to A HJ - SMR 3d 18-Sep-26 22-Sep-26 PermittingPermitting 80d 23-Sep-26 19-Jan-27
A4090 AHJ Initial Plan Check Review - SMR 20d 23-Sep-26 20-Oct-26 A4100 DBE Response to AHJ Plan Check Review Comments - SM R 10d 21-Oct-26 03-Nov-26 A4130 AHJ Second Plan Check Review - SMR 20d 04-Nov-26 04-Dec-26 A4140 DBE Response to AHJ's Second Plan Check Review Comm ents - SMR 10d 07-Dec-26 18-Dec-26 A41 10 AHJ Third Plan Check Review / Approval - SMR 15d 21-Dec-26 12-Jan-27 A4120 Obtain Building Permit for Package 1 Parking Struct ure - SMR 5d 13-Jan-27 19-Jan-27 Building PackageBuilding Package 140d 21-Jul-26 09-Feb-27 DesignDesign 60d 21-Jul-26 13-Oct-26
A1030 Design Kickoff Meeting 1d 21-Jul-26 21-Jul-26
A1040 Prepare 100% Schematic Design Documents - Building Package 15d 21-Jul-26 10-Aug-26 A1050 Owner Review / Comment on 100% Schematic Design Doc uments - Building Package 5d 1 1-Aug-26 17-Aug-26 A1070 Prepare 100% Design Development Documents - Buildin g Package 20d 1 1-Aug-26 08-Sep-26 A1080 Owner Review/ Comment on 100% Design Development Do cuments -Building Package 5d 09-Sep-26 15-Sep-26 A1 1 10 Prepare 100% Construction Documents - Building Pack age 25d 09-Sep-26 13-Oct-26 A1 150 Package and Submit 100% Construction Documents to A HJ - Building Package 2d 12-Oct-26 13-Oct-26 PermittingPermitting 80d 14-Oct-26 09-Feb-27
A1 160 AHJ Initial Plan Check Review - Building Package 20d 14-Oct-26 10-Nov-26 A1 170 DBE Response to AHJ Plan Check Review Comments - Bu ilding Package 10d 12-Nov-26 25-Nov-26 A1210 AHJ Second Plan Check Review - Building Package 20d 30-Nov-26 28-Dec-26 A1060 DBE Response to AHJ's Second Plan Check Review Comm ents - Building Package 10d 29-Dec-26 12-Jan-27 A1 180 AHJ Third Plan Check Review / Approval - Building P ackage 15d 13-Jan-27 02-Feb-27 A1200 Obtain Building Permit for Package 1 Parking Struct ure - Building Package 5d 03-Feb-27 09-Feb-27 Bid & A ward SubcontractsBid & A ward Subcontracts 1 15d 21-Jul-26 05-Jan-27 Design Build T rade PartnersDesign Build T rade Partners 20d 21-Jul-26 17-Aug-26 A2280 Onboard Design Build Trade Partners 20d 21-Jul-26 17-Aug-26 Remaining T rade PartnersRemaining T rade Partners 55d 14-Oct-26 05-Jan-27 A2380 Prepare Bid Package Based on Plan Check Drawings 5d 14-Oct-26 20-Oct-26 A2390 Bid Period 5d 21-Oct-26 27-Oct-26
A2400 McCarthy Scope & Review Bids 10d 28-Oct-26 10-Nov-26 A2410 McCarthy Select Subcontractors 5d 12-Nov-26 18-Nov-26 A2420 Finalize Subcontract Agreements 30d 19-Nov-26 05-Jan-27 Critical Submittals / Long Lead ItemsCritical Submittals / Long Lead Items 254d 09-Sep-26 09-Sep-27 A2440 Electrical Equipment Shop Drawings / Approval / Fab / Deliver (45 Weeks) 225d 09-Sep-26 29-Jul-27 A2430 Foundation Rebar Shop Drawings / Approval / Fab / D eliver 25d 06-Jan-27 09-Feb-27 A2460 Elevator Shop Drawings / Approval / Fab / Deliver 100d 10-Feb-27 30-Jun-27 A2450 Field Measure / Fab / Deliver Stairs 30d 29-Jul-27 09-Sep-27 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
DBE Response to AHJ Plan Check Review Comments - Su rface Parking Lot AHJ Second Plan Check Review - Surface Parking Lot
Obtain Building Permit - Surface Parking Lot
Design Kickoff Meeting
Prepare 100% Schematic Design Documents - SMR
Prepare 100% Design Development Documents - SMR
Owner Review / Comment on 100% Schematic Design Doc uments - SMR Owner Review/ Comment on 100% Design Development Do cuments - SMR Prepare 100% Construction Documents - SMR
Package and Submit 100% Construction Documents to A HJ - SMR AHJ Initial Plan Check Review - SMR
DBE Response to AHJ Plan Check Review Comments - SM R
AHJ Second Plan Check Review - SMR
DBE Response to AHJ's Second Plan Check Review Comm ents - SMR AHJ Third Plan Check Review / Approval - SMR
Obtain Building Permit for Package 1 Parking Struct ure - SMR Design Kickoff Meeting
Prepare 100% Schematic Design Documents - Building Package Owner Review / Comment on 100% Schematic Design Doc uments - Building Package Prepare 100% Design Development Documents - Buildin g Package Owner Review/ Comment on 100% Design Development Do cuments -Building Package Prepare 100% Construction Documents - Building Pack age Package and Submit 100% Construction Documents to A HJ - Building Package AHJ Initial Plan Check Review - Building Package
DBE Response to AHJ Plan Check Review Comments - Bu ilding Package AHJ Second Plan Check Review - Building Package
DBE Response to AHJ's Second Plan Check Review Comm ents - Building Package AHJ Third Plan Check Review / Approval - Building P ackage Obtain Building Permit for Package 1 Parking Struct ure - Building Package Onboard Design Build Trade Partners
Prepare Bid Package Based on Plan Check Drawings
Bid Period
McCarthy Scope & Review Bids
McCarthy Select Subcontractors
Finalize Subcontract Agreements
Electrical Equipment Shop Drawings / Approval / Fab / Deliver (45 Weeks) Foundation Rebar Shop Drawings / Approval / Fab / D eliver Elevator Shop Drawings / Approval / Fab / Deliver
Field Measure / Fab / Deliver Stairs
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
207
Activity ID Activity Name Orig Dur Start Finish
ConstructionConstruction 397d 21-Jul-26 15-Feb-28
Surface Parking LotSurface Parking Lot 265d 21-Jul-26 05-Aug-27 A4430 SCE Coordination / Permanent Power Installation 198d 21-Jul-26 30-Apr-27 A4380 South Lot Construction 60d 04-Nov-26 02-Feb-27
A4400 Submit & Review Submittal & Fabrication - Detention Basin & Pump System 100d 04-Nov-26 30-Mar-27 A4410 Install Detention Basin & Pump System 30d 31-Mar-27 1 1-May-27 A4390 North Lot Construction 60d 12-May-27 05-Aug-27
Package 2 Make-ReadyPackage 2 Make-Ready 25d 03-Feb-27 09-Mar-27 Site SetupSite Setup 15d 03-Feb-27 23-Feb-27
A2000 Set Site Fence / SWPPP 5d 03-Feb-27 09-Feb-27
A2010 Mobilize Construction Trailers 15d 03-Feb-27 23-Feb-27 Make-Ready ScopeMake-Ready Scope 20d 10-Feb-27 09-Mar-27 A2040 Rough Grade 10d 10-Feb-27 23-Feb-27
A2050 Fine Grade / Building Pad Certification 15d 17-Feb-27 09-Mar-27 Package 1 Parking StructurePackage 1 Parking Structure 357d 16-Sep-26 15-Feb-28 SubstructureSubstructure 46d 10-Mar-27 12-May-27
FoundationsFoundations 22d 10-Mar-27 08-Apr-27
A2230 Layout Foundations 2d 10-Mar-27 1 1-Mar-27
A2090 E/F/R/P Foundation Pour #1 7d 12-Mar-27 22-Mar-27 A2100 E/F/R/P Foundation Pour #2 6d 19-Mar-27 26-Mar-27 A21 10 E/F/R/P Foundation Pour #3 6d 24-Mar-27 31-Mar-27 A2120 E/F/R/P Foundation Pour #4 6d 29-Mar-27 05-Apr-27 A2130 E/F/R/P Foundation Pour #5 6d 01-Apr-27 08-Apr-27 Ground Level VerticalGround Level Vertical 21d 23-Mar-27 20-Apr-27 A2190 F/R/P Upturn Beams / Columns - Level 1 Pour #1 8d 23-Mar-27 01-Apr-27 A2200 F/R/P Upturn Beams / Columns - Level 1 Pour #2 8d 29-Mar-27 07-Apr-27 A2210 F/R/P Upturn Beams / Columns - Level 1 Pour #3 8d 01-Apr-27 12-Apr-27 A2220 F/R/P Upturn Beams / Columns - Level 1 Pour #4 8d 06-Apr-27 15-Apr-27 A2240 F/R/P Upturn Beams / Columns - Level 1 Pour #5 8d 09-Apr-27 20-Apr-27 Ramp WallsRamp Walls 17d 02-Apr-27 26-Apr-27
A2330 CMU Ramp Walls 10d 02-Apr-27 15-Apr-27
A2340 Wa te rp roo f R amp Walls 2d 16-Apr-27 19-Apr-27 A2360 Backfill Ramp Wa ll s 5d 20-Apr-27 26-Apr-27
Underslab UtilitiesUnderslab Utilities 23d 02-Apr-27 04-May-27 A2470 Underslab Plumbing 23d 02-Apr-27 04-May-27
A2480 Underslab Electrical 23d 02-Apr-27 04-May-27
Slab on GradeSlab on Grade 24d 09-Apr-27 12-May-27
A2490 F/R/P Slab on Grade Pour #1 6d 09-Apr-27 16-Apr-27 A2500 F/R/P Slab on Grade Pour #2 6d 22-Apr-27 29-Apr-27 A2510 F/R/P Slab on Grade Pour #3 6d 27-Apr-27 04-May-27 A2520 F/R/P Slab on Grade Pour #4 6d 30-Apr-27 07-May-27 A2530 F/R/P Slab on Grade Pour #5 6d 05-May-27 12-May-27 SuperstructureSuperstructure 105d 19-Apr-27 15-Sep-27
Level 2 Elevated DecksLevel 2 Elevated Decks 40d 19-Apr-27 14-Jun-27 Deck #1Deck #1 18d 19-Apr-27 12-May-27
A4190 Mobilize Deck System 5d 19-Apr-27 23-Apr-27
A2590 F/R/P Elevated Deck Pour #1 5d 29-Apr-27 05-May-27 A2600 F/R/P Upturn Beams / Columns on Pour #1 5d 06-May-27 12-May-27 A3540 Cure Elevated Deck Pour #1 1d 06-May-27 06-May-27 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
SCE Coordination / Permanent Power Installation
South Lot Construction
Submit & Review Submittal & Fabrication - Detention Basin & Pump System Install Detention Basin & Pump System
North Lot Construction
Set Site Fence / SWPPP
Mobilize Construction Trailers
Rough Grade
Fine Grade / Building Pad Certification
Layout Foundations
E/F/R/P Foundation Pour #1
E/F/R/P Foundation Pour #2
E/F/R/P Foundation Pour #3
E/F/R/P Foundation Pour #4
E/F/R/P Foundation Pour #5
F/R/P Upturn Beams / Columns - Level 1 Pour #1
F/R/P Upturn Beams / Columns - Level 1 Pour #2
F/R/P Upturn Beams / Columns - Level 1 Pour #3
F/R/P Upturn Beams / Columns - Level 1 Pour #4
F/R/P Upturn Beams / Columns - Level 1 Pour #5
CMU Ramp Walls
Wa terp roo f R amp Walls
Backfill Ramp Wa ll s
Underslab Plumbing
Underslab Electrical
F/R/P Slab on Grade Pour #1
F/R/P Slab on Grade Pour #2
F/R/P Slab on Grade Pour #3
F/R/P Slab on Grade Pour #4
F/R/P Slab on Grade Pour #5
Mobilize Deck System
F/R/P Elevated Deck Pour #1
F/R/P Upturn Beams / Columns on Pour #1
Cure Elevated Deck Pour #1
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
208
Activity ID Activity Name Orig Dur Start Finish
Deck #2Deck #2 1 1d 07-May-27 21-May-27
A2610 F/R/P Elevated Deck Pour #2 6d 07-May-27 14-May-27 A3560 Cure Elevated Deck Pour #2 1d 15-May-27 15-May-27 A2620 F/R/P Upturn Beams / Columns on Pour #2 5d 17-May-27 21-May-27 Deck #3Deck #3 10d 17-May-27 28-May-27
A2630 F/R/P Elevated Deck Pour #3 5d 17-May-27 21-May-27 A3570 Cure Elevated Deck Pour #3 1d 22-May-27 22-May-27 A2640 F/R/P Upturn Beams / Columns on Pour #3 5d 24-May-27 28-May-27 Deck #4Deck #4 10d 24-May-27 07-Jun-27
A2650 F/R/P Elevated Deck Pour #4 5d 24-May-27 28-May-27 A3580 Cure Elevated Deck Pour #4 1d 29-May-27 29-May-27 A2660 F/R/P Upturn Beams / Columns on Pour #4 5d 01-Jun-27 07-Jun-27 Deck #5Deck #5 10d 01-Jun-27 14-Jun-27
A2670 F/R/P Elevated Deck Pour #5 5d 01-Jun-27 07-Jun-27 A2680 F/R/P Upturn Beams / Columns on Pour #5 5d 08-Jun-27 14-Jun-27 A3590 Cure Elevated Deck Pour #5 1d 08-Jun-27 08-Jun-27 Level 3 Elevated DecksLevel 3 Elevated Decks 34d 09-Jun-27 27-Jul-27 Deck #6Deck #6 10d 09-Jun-27 22-Jun-27
A2690 F/R/P Elevated Deck Pour #6 5d 09-Jun-27 15-Jun-27 A2700 F/R/P Upturn Beams / Columns on Pour #6 5d 16-Jun-27 22-Jun-27 A3600 Cure Elevated Deck Pour #6 1d 16-Jun-27 16-Jun-27 Deck #7Deck #7 10d 17-Jun-27 30-Jun-27
A2710 F/R/P Elevated Deck Pour #7 5d 17-Jun-27 23-Jun-27 A2720 F/R/P Upturn Beams / Columns on Pour #7 5d 24-Jun-27 30-Jun-27 A3610 Cure Elevated Deck Pour #7 1d 24-Jun-27 24-Jun-27 Deck #8Deck #8 10d 25-Jun-27 09-Jul-27
A2730 F/R/P Elevated Deck Pour #8 5d 25-Jun-27 01-Jul-27 A2740 F/R/P Upturn Beams / Columns on Pour #8 5d 02-Jul-27 09-Jul-27 A3620 Cure Elevated Deck Pour #8 1d 02-Jul-27 02-Jul-27 Deck #9Deck #9 10d 06-Jul-27 19-Jul-27
A2750 F/R/P Elevated Deck Pour #9 5d 06-Jul-27 12-Jul-27 A2760 F/R/P Upturn Beams / Columns on Pour #9 5d 13-Jul-27 19-Jul-27 A3630 Cure Elevated Deck Pour #9 1d 13-Jul-27 13-Jul-27 Deck #10Deck #10 10d 14-Jul-27 27-Jul-27
A2770 F/R/P Elevated Deck Pour #10 5d 14-Jul-27 20-Jul-27 A2780 F/R/P Upturn Beams / Columns on Pour #10 5d 21-Jul-27 27-Jul-27 A3550 Cure Elevated Deck Pour #10 1d 21-Jul-27 21-Jul-27 Level 4 Elevated DecksLevel 4 Elevated Decks 27d 22-Jul-27 27-Aug-27 Deck #11Deck #11 10d 22-Jul-27 04-Aug-27
A2790 F/R/P Elevated Deck Pour #1 1 5d 22-Jul-27 28-Jul-27 A2800 F/R/P Upturn Beams / Columns on Pour #11 5d 29-Jul-27 04-Aug-27 A3640 Cure Elevated Deck Pour #1 1 1d 29-Jul-27 29-Jul-27 Deck #12Deck #12 10d 30-Jul-27 12-Aug-27
A2810 F/R/P Elevated Deck Pour #12 5d 30-Jul-27 05-Aug-27 A2820 F/R/P Upturn Beams / Columns on Pour #12 5d 06-Aug-27 12-Aug-27 A3650 Cure Elevated Deck Pour #12 1d 06-Aug-27 06-Aug-27 Deck #13Deck #13 10d 09-Aug-27 20-Aug-27
A2830 F/R/P Elevated Deck Pour #13 5d 09-Aug-27 13-Aug-27 A3660 Cure Elevated Deck Pour #13 1d 14-Aug-27 14-Aug-27 A2840 F/R/P Upturn Beams / Columns on Pour #13 5d 16-Aug-27 20-Aug-27 Deck #14Deck #14 10d 16-Aug-27 27-Aug-27
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
F/R/P Elevated Deck Pour #2
Cure Elevated Deck Pour #2
F/R/P Upturn Beams / Columns on Pour #2
F/R/P Elevated Deck Pour #3
Cure Elevated Deck Pour #3
F/R/P Upturn Beams / Columns on Pour #3
F/R/P Elevated Deck Pour #4
Cure Elevated Deck Pour #4
F/R/P Upturn Beams / Columns on Pour #4
F/R/P Elevated Deck Pour #5
F/R/P Upturn Beams / Columns on Pour #5
Cure Elevated Deck Pour #5
F/R/P Elevated Deck Pour #6
F/R/P Upturn Beams / Columns on Pour #6
Cure Elevated Deck Pour #6
F/R/P Elevated Deck Pour #7
F/R/P Upturn Beams / Columns on Pour #7
Cure Elevated Deck Pour #7
F/R/P Elevated Deck Pour #8
F/R/P Upturn Beams / Columns on Pour #8
Cure Elevated Deck Pour #8
F/R/P Elevated Deck Pour #9
F/R/P Upturn Beams / Columns on Pour #9
Cure Elevated Deck Pour #9
F/R/P Elevated Deck Pour #10
F/R/P Upturn Beams / Columns on Pour #10
Cure Elevated Deck Pour #10
F/R/P Elevated Deck Pour #1 1
F/R/P Upturn Beams / Columns on Pour #1 1
Cure Elevated Deck Pour #1 1
F/R/P Elevated Deck Pour #12
F/R/P Upturn Beams / Columns on Pour #12
Cure Elevated Deck Pour #12
F/R/P Elevated Deck Pour #13
Cure Elevated Deck Pour #13
F/R/P Upturn Beams / Columns on Pour #13
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
209
Activity ID Activity Name Orig Dur Start Finish
A2850 F/R/P Elevated Deck Pour #14 5d 16-Aug-27 20-Aug-27 A3670 Cure Elevated Deck Pour #14 1d 21-Aug-27 21-Aug-27 A2860 F/R/P Upturn Beams / Columns on Pour #14 5d 23-Aug-27 27-Aug-27 Spandrel WallsSpandrel Walls 40d 21-Jul-27 15-Sep-27
A3870 F/R/P Spandrel Walls 40d 21-Jul-27 15-Sep-27
Elevators / StairsElevators / Stairs 177d 19-Mar-27 30-Nov-27 ElevatorsElevators 169d 19-Mar-27 16-Nov-27
A3290 Excavate Elevator Pit 3d 19-Mar-27 23-Mar-27
A4210 F/R/P Pit Bottom 10d 24-Mar-27 06-Apr-27
A4220 F/R/P Pit Walls 6d 07-Apr-27 14-Apr-27
A4230 Wa te rp roo f Ele vator Pit 2d 15-Apr-27 16-Apr-27 A4240 Backfill Elevator Pit 2d 21-Apr-27 22-Apr-27
A3190 CMU Shaft Wa lls 25d 24-Jun-27 29-Jul-27
A3200 Install Misc Metals Tube Steel, Roof, Hoistway Beam s 10d 30-Jul-27 12-Aug-27 A3210 F/R/P Roof Deck 5d 23-Aug-27 27-Aug-27
A3480 Prime & Paint Shaft Interior 5d 30-Aug-27 03-Sep-27 A3220 Shaft Enclosure / Cutrain Wal l / Su bstan ti al Dry-i n 10d 07-Sep-27 20-Sep-27 A3260 Elevator Installation 40d 21-Sep-27 16-Nov-27
StairsStairs 55d 10-Sep-27 30-Nov-27
A3230 Erect Stairs / Handrails 40d 10-Sep-27 04-Nov-27
A3240 F/R/P Stair Treads / Landings 10d 29-Oct-27 12-Nov-27 A3250 Prime & Paint Stairs 10d 05-Nov-27 19-Nov-27
A3840 MEP Trim / Devices 10d 15-Nov-27 30-Nov-27
Exterior FacadeExterior Facade 55d 1 1-Aug-27 27-Oct-27 A3270 Sack & Patch Exterior - All Elevations 45d 1 1-Aug-27 13-Oct-27 A3280 Prime & Paint Exterior - All Elevations 30d 16-Sep-27 27-Oct-27 SCE - Permanent PowerSCE - Permanent Power 215d 16-Sep-26 22-Jul-27 A4420 SCE Coordination / Permanent Power Installation 215d 16-Sep-26 22-Jul-27 Interior MEP's and FinishesInterior MEP's and Finishes 124d 08-Jun-27 03-Dec-27 A3300 CMU Wall s (Elec/Mech /Stora ge/Ele v Mach in e Ro oms) 20d 08-Jun-27 06-Jul-27 A3470 Sack & Patch Mock-up 5d 08-Jun-27 14-Jun-27
A3310 Sack & Patch Interior - All Levels 60d 15-Jun-27 08-Sep-27 A3330 Plumbing Systems - All Levels 60d 29-Jun-27 22-Sep-27 A3340 Fire Protection Systems - All Levels 60d 29-Jun-27 22-Sep-27 A3350 Mechanical Equipment / Systems 15d 07-Jul-27 27-Jul-27 A3370 Install Doors & Hardware 5d 07-Jul-27 13-Jul-27
A3360 Prime & Paint Interior - All Levels 60d 21-Jul-27 13-Oct-27 A3320 Electrical Equipment Installations 30d 30-Jul-27 10-Sep-27 A3380 Lighting & Exit Signage - All Levels 60d 1 1-Aug-27 03-Nov-27 A3430 Final Clean - All Levels 20d 14-Oct-27 10-Nov-27
A3400 Elastomeric Coating Over Delay Strips / Rooms 10d 12-Nov-27 29-Nov-27 A3390 Striping & Signage - All Levels 10d 18-Nov-27 03-Dec-27 A3410 Install Detectable Warning Strip s - All Levels 10d 18-Nov-27 03-Dec-27 A3420 Install Bike Racks 10d 18-Nov-27 03-Dec-27
Finish Site WorkFinish Site Work 45d 13-Oct-27 17-Dec-27 A3880 Finish Site Hardscape / Landscape 45d 13-Oct-27 17-Dec-27 MEP Start-up, T esting and CommissioningMEP Start-up, T esting and Commissioning 107d 13-Sep-27 15-Feb-28 A3440 Energize Electrical Equipment / Permanent Power 1d 13-Sep-27 13-Sep-27 A3460 Start-up, Testin g and Co mmission ing of All Systems 30d 22-Oct-27 07-Dec-27 A3450 State Elevator Inspection 2d 17-Nov-27 18-Nov-27
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
F/R/P Elevated Deck Pour #14
Cure Elevated Deck Pour #14
F/R/P Upturn Beams / Columns on Pour #14
F/R/P Spandrel Walls
Excavate Elevator Pit
F/R/P Pit Bottom
F/R/P Pit Walls
Wa te rp roo f Ele vator Pit
Backfill Elevator Pit
CMU Shaft Wa lls
Install Misc Metals Tube Steel, Roof, Hoistway Beam s
F/R/P Roof Deck
Prime & Paint Shaft Interior
Shaft Enclosure / Cutrain Wal l / Su bstan ti al Dry-i n Elevator Installation
Erect Stairs / Handrails
F/R/P Stair Treads / Landings
Prime & Paint Stairs
MEP Trim / Devices
Sack & Patch Exterior - All Elevations
Prime & Paint Exterior - All Elevations
SCE Coordination / Permanent Power Installation
CMU Wall s (Elec/Mech /Stora ge/Ele v Mach in e Ro oms) Sack & Patch Mock-up
Sack & Patch Interior - All Levels
Plumbing Systems - All Levels
Fire Protection Systems - All Levels
Mechanical Equipment / Systems
Install Doors & Hardware
Prime & Paint Interior - All Levels
Electrical Equipment Installations
Lighting & Exit Signage - All Levels
Final Clean - All Levels
Elastomeric Coating Over Delay Strips / Rooms
Striping & Signage - All Levels
Install Detectable Warning Strip s - All Levels
Install Bike Racks
Finish Site Hardscape / Landscape
Energize Electrical Equipment / Permanent Power
Start-up, Testin g and Co mmission ing of All Systems
State Elevator Inspection
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
210
Activity ID Activity Name Orig Dur Start Finish
A3850 Fire-Life-Safety Sign-off 5d 08-Dec-27 14-Dec-27
A3860 Building Department Sign-off 5d 20-Dec-27 27-Dec-27 A3490 Inclement Weather Allowance 15d 28-Dec-27 18-Jan-28 A3500 Substantial Completion 0d 18-Jan-28
A3510 Punchlist and Corrections 10d 19-Jan-28 01-Feb-28 A3520 Project Closeout 20d 19-Jan-28 15-Feb-28
A3530 Final Completion 0d 15-Feb-28
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar AprMay 2026 2027 2028
Fire-Life-Safety Sign-off
Building Department Sign-off
Inclement Weather Allowance
Substantial Completion
Punchlist and Corrections
Project Closeout
Final Completion
Run Date: 22-Jun-26
Start Date: 11-May-26
Finish Date: 15-Feb-28
Data Date: 11-May-26
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Torrance Regional Transit Center Parking Structure
Preliminary Design and Construction Schedule
211
1 FIRST AMENDMENT TO CONSULTING SERVICES AGREEMENT
(
C2026
-
045
)
This
First
Amendment to Consulting Services Agreement C
2026
-
045
(
the
“
First
Amendment”) is made
and entered into
as of
July 21
, 2026
(the “Effective Date”), by
and between the CITY OF TORRANCE (“CITY”), a municipal corporation, and MOCA
Systems, Inc.
,
a
Delaware
corporation (“CONSULTANT”).
RECITALS:
A.
The CITY previously circulated a Request for
Proposal
(
the
“RF
P
”) for
Owner’s
Representative Services for Planning, Design, and Construction of a New Parking Structure Located at Transit Regional Center
, RF
P
No.
B2025
-
28 (the “RF
P
”).
B.
CONSULTANT submitted a
Proposal
(the “Proposal”)
in response to the RF
P
. In
its
Proposal
, the CONSULTANT represented that it was qualified to perform those services requested in the RF
P
. Based upon its review of all
Proposals
submitted
in response to the RF
P
, the CITY awarded the Agreement to CONSULTANT.
C.
On
March 24, 2026
,
CITY
and CONSULTANT entered into Consulting Services
Agreement (C
2026
-
045
) (the "Agreement"), to perform those services in an
amount not to exceed $
1,809,600
through
February 28, 2030
.
D.
The CITY is satisfied with the level of service provided by CONSULTANT and now
wishes to
enter into this First Amendment to
increase the amount of the Agreement
by $
717,896.74
to
cover
the
additional scope of services
set forth in the
Amended
Proposal
attached here as Exhibit B
-
2,
and
for a
n updated
not
to
exceed sum of
$
2,
527,496.74
.
AGREEMENT:
1. Paragraph
1 of the Agreement, entitled “
SERVICES TO BE PERFORMED BY
CONSULTANT
”
,
is amended to read in its entirety as follows:
“
1 .
SERVICES TO BE PERFORMED BY CONSULTANT
CONSULTANT will provide the services and install those materials listed in CONSULTANT’s Proposal submitted in response to the RFP
and the
additional scope of services in the Amended Proposal
. A copy of the RFP
is attached as Exhibit A. A copy of the
Proposal is attached as Exhibit B. A
copy of the
Amended Proposal
is attached as Exhibit B
-
2 .
CONSULTANT
warrants that all work and services set forth in Exhibit B and Exhibit B -
2 will be performed in a competent, professional and satisfactory manner. ”
2. Paragraph 3
of the Agreement, entitled
“COMPENSATION”
, subsection A,
entitled “CONSULTANT’s fee”,
is amended to read in its entirety as follows:
ATTACHMENT 2
212
2 “
3. COMPENSATION
A.
CONSULTANT’S Fee.
For services rendered pursuant to this Agreement, CONSULTANT will be paid in accordance with the Compensation Schedule set forth in Exhibit B and Exhibit B
-
2 ; provided, however, that in no event will the
total amount of money paid CONSULTANT, for service contemplated by this Agreement, exceed the sum of $
2,
527,496.74
(“Agreement Sum”),
unless otherwise first approved in writing by CITY.
”
3. Except as expressly set forth in this First Amendment, i n all other respects, the
Agreement dated
March 24, 2026
between CITY and CONSULTANT is ratified
,
reaffirmed and
remains
in full force and effect.
CITY OF TORRANCE,
a municipal corporation
_____________________________
Sharon Kalani, Mayor
MOCA Systems, Inc.
,
a
Delaware
corporation
____________________________
Anthony Houston Drum
Vice President
ATTEST:
_____________________________
Rebecca Poirier, MMC
City Clerk
APPROVED AS TO FORM
PATRICK Q. SULLIVAN
City Attorney
By:
Jennifer V
icente
Guerrero
Deputy City Attorney
Attachment:
Ex
h
ibit B
-
2 Amended Proposal
213
3 E
XHIBIT
B
-
2 AMENDED PROPOSAL
214
MOCA SYSTEMS, INC.
210 PROGRESS, SUITE 240
IRVINE, CA 92618
(949) 264-8129
mocasystems.com
22 June 2026
Milton Sanabria
Administrative Services Manager
General Services Department, City of Torrance
3031 Torrance Blvd.
Torrance, CA 90503
RE: MOCA Contract Amendment #3 Proposal – Regional Transit Center Parking Structure Special Inspections and Materials Testing Services, Soils Observations and Testing, Commissioning Agent, Flow Test and Project Contingency.
Dear Milton,
Thank you for your continued trust in MOCA Systems, Inc. (MOCA) to further support the City of Torrance in the development of a New Parking Structure at Regional Transit Center.
Please see the enclosed proposed Scope of Services and Fee Proposal for Contract Amendment #3, pertaining to Procurement of Special Inspection and Material Testing, Soils Observation and Testing, Commissioning Services, Flow Test and Coningency for Planning, Design, and Construction of the New Parking Structure Located at the Torrance Regional Transit Center (Project), located at 485 Crenshaw Blvd, Torrance, CA.
In this amendment, MOCA is adding the following scope and/or services:
• Procurement of Special Inspection and Material Tes ting Services for Torrance Regional Transit Center • Procurement of Soils Observation and Testing Servi ces for Torrance Regional Transit Center • Procurement of Commissioning Services for Torrance Regional Transit Center • Flow Test Fee
• Project Contingency
Within this proposal we are including:
• Scope of Services
• Exclusions
• Schedule
• Fee Proposal
We understand that the fees within this Contract Amendment #3 proposal will modify MOCA’s City Council approved original contract proposal.
SCOPE OF SERVICES
Below is our proposed scope of services for the Project. We have outlined our scope of services which correlates to the fee proposal on subsequent pages. Refer to the Project Schedule for further details.
215
MOCA SYSTEMS, INC.
210 PROGRESS, SUITE 240
IRVINE, CA 92618
(949) 264-8129
mocasystems.com
Special Inspection and Material Testing (CONCURRENT WITH PROJECT CONSTRUCTION)
• Onsite Observation and inspection of Reinforcing S teel • Onsite Observation and inspection of Concrete Plac ement • Material Strength Testing
• Onsite Observation and inspection of post-tensioni ng • Onsite Observation and inspection of CMU
• Onsite Observation and inspection of welding and w elded elements • Verify Proper Installation of Anchor Bolts
Consultant participants: Smith Emery Laboratories
Special Inspection Deliverables:
• Daily Field Reports
• Discrepancy Notices
• Final Completion Letter
EXCLUDED SERVICES
• Soils Observation
• Soils Testing
SCHEDULE
Special Inspection and Material Testing Start August, 2026 Special Inspection and Material Testing Complete March, 2028
Total Duration 20 Months
216
MOCA SYSTEMS, INC.
210 PROGRESS, SUITE 240
IRVINE, CA 92618
(949) 264-8129
mocasystems.com
Soils Observation and Testing (CONCURRENT WITH PROJ ECT CONSTRUCTION)
Observation and Testing of:
• Offsite work (utility connections, subgrade for cu rb & gutter, sidewalk and paving); • Pad over-excavation and re-compaction;
• Foundation excavations;
• Slab subgrade preparation;
• Utility trench and retaining wall backfill;
• Pavement subgrade preparation; and
• Placement of aggregate base.
Consultant participants: Carl Kim Geotechnical
Soils Observation and Testing Deliverables:
• Boring Logs
• Daily Field Reports
• Final Reports
EXCLUDED SERVICES
• Construction Materials Testing
• Verification of Line-and-Grade
SCHEDULE
Soils Observation and Testing Start August, 2026
Soils Observation and Testing Complete March, 2028
Total Duration 20 Months
217
MOCA SYSTEMS, INC.
210 PROGRESS, SUITE 240
IRVINE, CA 92618
(949) 264-8129
mocasystems.com
Commissioning Services (CONCURRENT WITH PROJECT DES IGN AND CONSTRUCTION)
• Review Owner Project Requirements (OPR), Bases of Design (BOD), and the Design-Build team's submittals for the commissioned systems.
• Develop a formal Project Commissioning Plan detail ing team responsibilities, schedules, and testing protocols. • Incorporate specialized commissioning specificatio ns into the construction documents. • Conduct focused construction-phase site visits to inspect equipment placement and electrical rough-ins. • Review contractor startup logs, manufacturer test data, and factory witness tests. • Verify Pre-Functional Checklists (PFCs) completed by the trade subcontractors. • Draft detailed, system-specific FPT protocols repl icating real-world transit garage operations. • Direct and witness hands-on functional testing, in cluding: Integrated Parking Loop: Validating that an incoming vehicle seamlessly triggers the LPR camera, opens the entry gate, and accurately communicates space availability data. • Test payment kiosk transaction communication back to transit center financial servers. • Simulating peak power demands to verify the EV cha rgers' throttle capacity without tripping local breakers. • Maintain an active Commissioning Issues Log to tra ck deficiencies, resolution tracking, and re-testing outcomes. • Verify that City operations personnel receive thor ough, system-specific training from equipment manufacturers. • Review the Operation and Maintenance (O&M) manuals for technical accuracy and completeness. • Deliver a Final Commissioning Report containing al l signed FPT logs, certificates of compliance, and recommended trend- logging metrics.
Consultant participants: Capital Engineering
Commissioning Deliverables:
• Site Observation Reports
• Commissioning Schedule
• Project Commissioning Plan
• Final Commissioning Report
EXCLUDED SERVICES
• Parksmart Certification Support
• MAT and LAT Title 24 Acceptance Tests
SCHEDULE
Commissioning Start August, 2026
Commissioning Complete March, 2028
Total Duration 20 Months
218
MOCA SYSTEMS, INC.
210 PROGRESS, SUITE 240
IRVINE, CA 92618
(949) 264-8129
mocasystems.com
FEE PROPOSAL
Special Inspection and Material Testing Fee: $295,098.40 MOCA Overhead and Profit: $29,509.84
$324,608.24
Soils Observation and Testing Fee: $189,465.00 MOCA Overhead and Profit: $18,946.50
$208,411.50
Commissioning Agent Fee: $58,200.00
MOCA Overhead and Profit: $5,820.00
$64,020.00
Flow Test: $500.00
Project Contingency: $120,357.00
$717,896.74
Remaining Contract Contingency Allowance: $101,600
Note, this contingency remaining reflects the approval of Amendment #1 for Temporary Lot and Amendment #2 for Master Planning.
Amendment #3 will require modification of the contract contingency allowance
We appreciate this opportunity and look forward to collaborating with you on this project. Please do not hesitate to contact me with any additional questions or requests.
Sincerely,
Houston Drum, AIA, DBIA, LEED AP
Vice President
[email protected]
(760) 954-5884
219
ATTACHMENT 3
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
ATTACHMENT 4