8I
Date: August 11, 2026
To: Honorable Mayor and Members of the City Council
From: Alvin Papa, Public Works Director
By: Brenda Moun, Engineering Manager | [email protected] Subject: Material Available #1 for Agenda Item 8I

DISCUSSION
Please find the following attachments which were not available at the time of posting the agenda:

1. Amendment No. 4 #MOU.MR312.26 (I-405/182nd St/Crenshaw Blvd)

2. Amendment No. 6 #MOU.MR312.40 (PCH/Vista Montana/Anza Ave)

3. Amendment No. 7 #MOU.MR312.10 (PCH/Hawthorne Blvd)

4. Amendment No. 7 #MOU.MR312.60 (Crenshaw Blvd/Del Amo Blvd)

5. Amendment No. 1 #MOU.MR312.63 (PCH/Crenshaw Blvd)

6. Amendment No. 6 #MOU.MR312.23 (Torrance Transit Park)

ATTACHMENTS

1. Amendment No. 4 #MOU.MR312.26 (I-405/182nd St/Crenshaw Blvd)

2. Amendment No. 6 #MOU.MR312.40 (PCH/Vista Montana/Anza Ave)

3. Amendment No. 7 #MOU.MR312.10 (PCH/Hawthorne Blvd)

4. Amendment No. 7 #MOU.MR312.60 (Crenshaw Blvd/Del Amo Blvd)

5. Amendment No. 1 #MOU.MR312.63 (PCH/Crenshaw Blvd)

6. Amendment No. 6 #MOU.MR312.23 (Torrance Transit Park) 1 FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 1 Measure R Funding Agreement Amendment Highways – General
AMENDMENT No.4 TO MEASURE R FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 4 to the Funding Agreement (this “Amendment”), is dated January 30, 2026, for reference purposes only, by and between the City of Torrance ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. Grantee and LACMTA entered into that certain Funding Agreement No. MOU.MR312.26, dated May 5, 2014, which was amended on August 31, 2019, August 15, 2020, and July 1, 2022 (as amended, the "Existing FA"), which Existing FA provides for the I-405 and 182nd St./Crenshaw Blvd Operational Improvements Project (the “Project”); and B. WHEREAS, the LACMTA Board on January 26, 2023 delegated administrative authority to staff to extend funding lapsing dates to meet PAED, PS&E, ROW and Construction time frames; and
C. WHEREAS, the Grantee and LACMTA desire to extend the lapsing date of Fiscal Year (FY) 2017-18 funds to June 30, 2027; and
D. Grantee and LACMTA desire to amend the Existing FA as provided herein. 2 ATTACHMENT 1
FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 2 Measure R Funding Agreement Amendment Highways – General
AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 11 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles, CA 90012
Attention: Minji Kwon, 99-18-2
(213)–410–8718
[email protected]”

2. Part II, Paragraph 3 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“3. INVOICE BY GRANTEE
Unless otherwise stated in this FA, the Quarterly Progress/ Expenditure Report, with supporting documentation of expenses, Project progress and other documents as required, which has been pre-approved by LACMTA, all as described in Part II, Section 6.1 of this FA, shall satisfy LACMTA invoicing requirements. Grantee shall only submit for payment the LACMTA pre-approved Quarterly Progress/ Expenditure Report Packets to the LACMTA Project Manager at the email address shown in Part I and to LACMTA Accounts Payable Department as shown below.

Submit invoice with supporting documentation to:

[email protected] (preferable)
or
mail to:

Los Angeles County Metropolitan Transportation Authority Accounts Payable
P. O. Box 512296
Los Angeles, CA 90051-0296
All invoice material must contain the following information:

Re: LACMTA Project ID# MR312.40 and FA# MOU.MR312.26
Minji Kwon; Mail Stop 99-18-2”

3. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
3 FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 3 Measure R Funding Agreement Amendment Highways – General
“6.1 GRANTEE shall submit the draft of Quarterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for review and pre-approval of the applicable report. LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should GRANTEE fail to submit either the draft or pre-approved reports within five (5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse GRANTEE until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, GRANTEE will still be required to submit the Quarterly Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then GRANTEE can submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement”

4. Part II, Section 9.1 (vii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “All Funds programmed for FY 2013-14, FY 2014-15 and FY 2016-17 have been expended and are no longer available. All Funds programmed for FY 2017- 18 are subject to lapse by June 30, 2027.”

5. Part II, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“12. COMMUNICATIONS:

12.1 GRANTEE shall ensure that all Communication Materials contain recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding Recipient Communications Guidelines” available online at http://metro.net/partners-civic. The Funding Recipient Communications Guidelines may be changed from time to time during the course of this Agreement. GRANTEE shall be responsible for complying with the latest Funding Recipient Communications Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this Agreement, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and 4 FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 4 Measure R Funding Agreement Amendment Highways – General
construction site signage. A more detailed definition of “Communications Materials” is found in the Funding Recipient Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding Recipients to use is included in the Funding Recipient Communications Guidelines.

12.4 GRANTEE shall ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shall be responsible for monitoring GRANTEE’s compliance with the terms and conditions of this Section. GRANTEE’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

6. Attachment B-1-3 of the Existing FA is hereby replaced by Attachment B-1-4, attached.

7. Attachment C-3 – Scope of Work of the Existing FA is hereby amended by deleting the Milestones Schedule and replacing it with the following Revised Milestones Schedule:

Proposed Milestones: The proposed implementation schedule for this project will be as follows:

MILESTONE:

START DATE COMPLETION DATE
PAED 8/2014 6/2015
PS&E 9/2015 9/2020
Right of Way Support 6/2015 12/2020
Right of Way Acquisition 6/2015 12/2020
Construction Support 1/2021 6/2025
Construction 1/2021 6/2025

START DATE COMPLETION DATE
PA&ED 8/2014 6/2015
PS&E 9/2015 12/2020
35% PS&E 3/2018 3/2018
65% PS&E 4/2019 4/2019
95% PS&E 12/2019 12/2019
Submittals & Reviews 1/2020 9/2020
RIGHT OF WAY SUPPORT 6/2015 12/2020
RIGHT OF WAY ACQUISITION 6/2015 12/2020
5 FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 5 Measure R Funding Agreement Amendment Highways – General
CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows .

START DATE COMPLETION DATE
Solicitation (Bid/Proposal)
Develop Solicitation Package* 9/2020 10/2020
Evaluations* 10/2020 2/2021
Contract Award* 11/2020 2/2021
Fully Executed Contract* 12/2020 2/2021
Landscape
General Construction/close out project* 1/2021 6/2026
*This work is performed by Caltrans

8. The parties have agreed that the Monthly Progress Report is no longer required and therefore, Attachment D-1 and all references thereto are hereby deleted.

9. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged.

IN WITNESS WHEREOF, the parties have caused this Amendment No. 4 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________ Date: ____________________ Stephanie Wiggins
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: ________________________________________ Date: ____________________ Deputy
March 13, 2026
6 FTIP# LA0G1008
Subregion ID: South Bay
Project#: MR312.26
Amendment No.4
FA # MOU.MR312.26
Rev.: 05.20.2025 6 Measure R Funding Agreement Amendment Highways – General
GRANTEE:

CITY OF TORRANCE
By: _______________________________________ Date: ____________________ Sharon Kalani
City Mayor
APPROVED AS TO FORM:

By: _______________________________________ Date: ____________________ Patrick Q. Sullivan
City Attorney
ATTEST:

By: _______________________________________ Date: ____________________ Rebecca Poirier, MMC
City Clerk
7 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 1 Measure R Funding Agreement Amendment Highways – General

AMENDMENT NO. 6 TO MEASURE R FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY

This Amendment No. 6 to the Funding Agreement (this “Amendment”), is dated as of January 13, 2026

, for reference purposes only,

by and between the City of
Torrance ("Grantee") and the
Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. Grantee and LACMTA entered into that certain Funding Agreement No.

MOU.MR312.40,

dated

April 28, 2014

, which was amended on

March 2
5, 2019, August 31,
2019, August 15, 2020, July 1, 2022, and September 29, 2023

(as amended, the

"Existing
FA"),

which Existing FA provides for the

Pacific Coast Highway at Vista Montana/Anza Ave.

Intersection Improvements

(the “Project”);

and

B. WHEREAS,

the

LACMTA Board
of Directors on

January 26, 2023 delegated
administrative authority to staff to extend funding lapsing dates to meet PAED, PS&E, ROW and Construction time frames; and

C. WHEREAS, the Grantee and LACMTA desire to extend the lapsing date of FY 2013- 14 funds to June 30, 2027

; and

D. Grantee and LACMTA desire to amend the Existing FA as provided herein.

ATTACHMENT 2
8 ATTACHMENT 2
FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 2 Measure R Funding Agreement Amendment Highways – General

AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 11 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles,

CA 90012
Attention:

Minji Kwon
, 99-18-2
(213)–410–8718
[email protected]”

2. Part II, Paragraph 3 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following

:

“3.

INVOICE BY GRANTEE

Unless otherwise stated in this FA, the Quarterly Progress/Expenditure Report, with supporting documentation of expenses, Project progress and other documents as required, which has been pre-approved by LACMTA, all as described in Part II, Section 6.1 of this FA, shall satisfy LACMTA invoicing requirements. Grante

e shall only submit for payment
the
LACMTA pre-approved Quarterly Progress/Expenditure Report Packets to the LACMTA Project Manager at the email address shown in Part I and to LACMTA Accounts Payable Department as shown below.

Submit invoice with supporting documentation to:

[email protected] (preferable)
or
mail to:

Los Angeles County Metropolitan Transportation Authority Accounts Payable
P. O. Box 512296
Los Angeles, CA 90051-0296
All invoice material must contain the following information:

Re: LACMTA Project ID# MR312.40 and FA# MOU.MR312.40
Minji Kwon; Mail Stop 99-18-2

3. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“6.1 Grantee

shall submit the draft of Quarterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for 9 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 3 Measure R Funding Agreement Amendment Highways – General

review and pre-approval of the applicable report. The LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should

Grantee

fail to submit either the draft or pre
-approved reports within five
(5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse Grantee

until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, Grantee

will still be required to submit the Quarterly
Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then Grantee can submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement.”

4. Part II, Section 9.1

(vii

)

of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“(vii)

Expending the
Funds granted under this FA
for allowable costs by the lapsing date. All Funds programmed for FY 20

13 -14 are subject to
lapse by June 30, 20

27 .”

5. Part II,

Paragraph
12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“12. COMMUNICATIONS:

12.1 Grantee

shall ensure that all Communication Materials contain
recognition of LACMTA’s contribution to the Project as more particularly set forth in the “Funding

Recipient Communications Guidelines” available online

at
http://metro.net/partners-civic
.

The Funding Recipient

Communications Guidelines may
be changed from time to time during the course of this FA. GRANTEE shall be responsible for complying with the latest Funding Recipient

Communications Guidelines during the
term of this

FA
, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this FA, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and construction site signage.

A more detailed definition of “Communications Materials” is found in the Funding Recipient

Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines.

The preferred logo lock
-up for
Funding Recipients to use is included in the Funding Recipient Communications Guidelines.
10 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 4 Measure R Funding Agreement Amendment Highways – General

12.4 Grantee shall ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shall be responsible for monitoring Grantee’s compliance with the terms and conditions of this Section. Grantee’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

6. Attachment B-1-5

of the Existing FA is hereby amended by deleting it in its entirety and

replac
ing it with

Attachment B
-1-6,

attached.

7. Attachment C-5 –

Scope of Work
of the Existing FA is hereby amended by deleting
the Milestones Schedule in its entirety

and replacing it with the following Revised
Milestones Schedule:

MILESTONES: The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE

SOLICITATION (BID/PROPOSAL)
Develop Solicitation Package MAR 2014 MAR 2014
Solicitation Response APR 2014 MAY 2014
Evaluations MAY 2014 MAY 2014
Selection JUN 2014 JUN 2014
Contract Award JUN 2014 JUN 2014
Fully Executed Contract JUL 2014 JUL 2014

PLANNING

PRELIMINARY DESIGN
Prepare Detailed Design Plans AUG 2014 DEC 2014
Prepare Detailed Construction Plans AUG 2014 DEC 2014
Prepare Project Cost Estimate AUG 2014 DEC 2014
PA&ED
Prepare Environmental Document
Document Type:______________
JUN 2014 JUN 2015
Scoping JUN 2014 JUN 2015
Technical Studies AUG 2014 AUG 2014
Draft Environmental Document MAR 2015 MAY 2015
Final Environmental Document MAY 2015 JUN 2015
Community Outreach MAR 2015 MAY 2015
Secure Project Approval MAR 2015 JUN 2015
PS&E
35% PS&E SEP 2014 APR 2015
11 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 5 Measure R Funding Agreement Amendment Highways – General

CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE

SOLICITATION (BID/PROPOSAL)
Develop Solicitation Package SEP 2021 OCT 2021
Solicitation Response OCT 2021 OCT 2021
Evaluations NOV 2021 NOV 2021
Selection NOV 2021 JAN 2022
Contract Award JAN 2022 JAN 2022
Fully Executed Contract JAN 2022 FEB 2022

EXCAVATION
Clear/Grub MAY 2022 NOV 2022
Survey MAY 2022 NOV 2022
Sample Borings MAY 2022 MAY 2022
Compaction MAY 2022 NOV 2022
Drainage MAY 2022 JUL 2022

ENVIRONMENTAL

CONCRETE
Form Work MAY 2022 NOV 2022
Rebar Placement MAY 2022 NOV 2022
Pole Placement MAY 2022 NOV 2022

TRAFFIC CONTROL
TMP MAY 2022 DEC 2023

STRUCTURAL
Pole Placement DEC 2023 DEC 2023

UTILITIES
SCE MAY 2022 DEC 2023

MATERIALS
Long-Lead Equipment MAR 2022 FEB 2023
Signage SEP 2022 MAY 2023

LANDSCAPE
General Construction/close out
project
MAY 2022 JUNE 2027

CHANGE ORDERS

65% PS&E JUL 2015 SEP 2015
95% PS&E OCT 2015 OCT 2021
Submit Final PS&E JAN 2020 OCT 2021
12 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40

Rev: 10.26.2022 6 Measure R Funding Agreement Amendment Highways – General

8. The parties have agreed that the Monthly Progress Report

is no longer required and
therefore, Attachment D-1

and all references thereto are hereby deleted

in its entirety
.

9. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged.

13 FTIP# LA0G1007
Subregion ID: South Bay
Project#: MR312.40
Amendment No.6
FA # MOU.MR312.40
Rev.: 05.20.2025 7 Measure R Funding Agreement Amendment Highways – General
IN WITNESS WHEREOF, the parties have caused this Amendment No. 6 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

L
ACMTA:

L

OS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY B
y: ________________________________

________
Date: ____________________
Stephanie Wiggins
Chief Executive Officer
A
PPROVED AS TO FORM:

D
AWYN R. HARRISON
County Counsel
B
y: ________________________________________ Date: ____________________ Deputy
G
RANTEE:

C

ITY OF TORRANCE
B
y: _______________________________________ Date: ____________________ Sharon Kalani
City M ayor
A
PPROVED AS TO FORM:

B
y: _______________________________________ Date: ____________________ Patrick Q. Sullivan
City Attorney
A
PPROVED AS TO FORM:

B
y: _______________________________________ Date: ____________________ Rebecca Poirier, MMC
City Clerk
March 12, 2026
14 FTIP# LA0G724
Subregion ID: South Bay
Project MR312.10
Amendment No. 7
Funding Agreement No. #MOU.MR312.10

Rev: 10.26.2022 1 Measure R Funding Agreement Amendment Highways – General

AMENDMENT NO. 7 TO MEASURE R FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY

This Amendment No. 7 to the Funding Agreement (this “Amendment”), is dated as of January 16, 2026, by and between the City of Torrance ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. Grantee and LACMTA entered into that certain Funding Agreement No.

MOU.MR312.10, dated January 20, 2012, which was amended on May 20, 2014, August 31, 2019, August 15, 2020, August 25, 2021, July 1, 2022, and September 29, 2023 (as amended, the "Existing FA"), which Existing FA provides for the Pacific Coast Highway at Hawthorne Boulevard Intersection Improvements (the “Project”); and

B. WHEREAS, the LACMTA Board on Ja nuary 26, 2023 delegated administrative authority to staff to extend funding lapsing dates to meet PAED, PS&E, ROW and Construction time frames; and

C. WHEREAS, Grantee and LACMTA desire to extend the lapsing date of FY 2021-22 funds to June 30, 2027; and

D. Grantee and LACMTA desire to amend the Existing FA as provided herein.

ATTACHMENT 3
15 ATTACHMENT 3
FTIP# LA0G724
Subregion ID: South Bay
Project MR312.10
Amendment No. 7
Funding Agreement No. #MOU.MR312.10

Rev: 10.26.2022 2 Measure R Funding Agreement Amendment Highways – General

AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 11 of the Existing FA is he reby amended by deleting it in its entirety and replacing it with the following:

“LACMTA’s Address:

Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles, CA 90012
Attention: Minji Kwon, 99-18-2
(213)–410–8718
[email protected]”

2. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“6.1 Grantee shall submit the draft Qu arterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for review and pre-approval of the applicable report. LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should Grantee fail to submit either the draft or pre-approved reports within five (5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse GRANTEE until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, GRANTEE will still be required to submit the Quarterly Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then Grantee may elect to submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement”

3. Part II, Section 9.1 (iv) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

(iv) expending the Funds granted under this FA for allowable costs by the lapsing date. All Funds programmed for FY 2011-12, FY 2013-14 and FY 2014-15 have lapsed 16 FTIP# LA0G724
Subregion ID: South Bay
Project MR312.10
Amendment No. 7
Funding Agreement No. #MOU.MR312.10

Rev: 10.26.2022 3 Measure R Funding Agreement Amendment Highways – General

and are no longer available. All Funds programmed for FY 2021-22 are subject to lapse by June 30, 2027.”

4. Part II, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“12. COMMUNICATIONS:

12.1 Grantee shall ensure that all Communication Materials contain recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding Recipient Communications Guidelines,” available online at http://metro.net/partners-civic. The Funding Recipient Communications Guidelines may be changed from time to time during the course of this Agreement. Grantee shall be responsible for complying with the latest Funding Recipient Communications Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this Agreemen t, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and construction site signage. A more detailed definition of “Communications Materials” is found in the Funding Recipient Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding Recipients to use is included in the Funding Recipient Communications Guidelines.

12.4 Grantee shall ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shal l be responsible for monitoring Grantee’s compliance with the terms and conditions of this Section. Grantee’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

5. Attachment B-1-6 of the Existing FA is hereby replaced by Attachment B-1-7, attached.

6. Attachment C-6 – Scope of Work of the Ex isting FA is hereby amended by deleting the Milestones Schedule and replacing it with the following Revised Milestones Schedule:

MILESTONES: The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE
17 FTIP# LA0G724
Subregion ID: South Bay
Project MR312.10
Amendment No. 7
Funding Agreement No. #MOU.MR312.10

Rev: 10.26.2022 4 Measure R Funding Agreement Amendment Highways – General

CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE

SOLICITATION (BID/PROPOSAL)
Develop Solicitation Package 8/17 7/20
Contract Award 7/20 12/20
Fully Executed Contract 10/20 12/20
ENVIRONMENTAL 8/21 2/23
CONCRETE 8/21 2/23
TRAFFIC CONTROL 8/21 2/23
STRUCTURAL 6/22 12/22
UTILITIES 8/21 2/23

MATERIALS
Long-Lead Equipment 1/21 2/23

7. The parties have agreed th at the Monthly Progress Report is no longer required and therefore, Attachment D-1 and all references thereto are hereby deleted.

8. Except as expressly amended hereby, the Exis ting FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged.

SOLICITATION (BID/PROPOSAL)
Fully Executed Contract 6/12 8/12

PLANNING
PRELIMINARY DESIGN 9/12 2/13
PA&ED 8/12 2/14
Prepare Environmental Document
Document Type: __MND_______
2/13 2/14
PS&E 8/12 3/18
65% PS&E 9/16 7/17
95% PS&E 7/17 3/18
Submit Final PS&E 8/12 9/17
Outside Agency Review 2/18 3/18
RIGHT OF WAY SUPPORT 3/14 9/16
RIGHT OF WAY ACQUISITION 8/14 9/16
Utility Relocation 1/13 9/15
LANDSCAPE 8/21 2/23
General Construction/close out project 3/22 6/26
18 FTIP# LA0G724
Subregion ID: South Bay
Project MR312.10
Amendment No. 7
Funding Agreement No. #MOU.MR312.10
Rev.: 05.20.2025 5 Measure R Funding Agreement Amendment Highways – General
IN WITNESS WHEREOF, the parties have caused this Amendment No. 7 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________ Date

: __________
__________
Stephanie Wiggins
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: ________________________________________ Date

: __________
__________
D e p u t y
GRANTEE:

CITY OF TORRANCE
By: _______________________________________ Date: ____________________ Sharon Kalani
City Mayor
APPROVED AS TO FORM:

By: _______________________________________ Date: ____________________ Patrick Q. Sullivan
City Attorney
By: _______________________________________ Date: ____________________ Rebecca Poirier, MMC
City Clerk
03/04/2026
19 ATTACHMENT 4
FTIP# LA0G1010
Subregion ID: South Bay
Project#: MR312.60/MM5508.17
Amendment No.7
FA # 920000000MR31260
AMENDMENT No.7 TO FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 7 to the Funding Agreement (this “Amendment”), is dated April 10, 2026, for reference purposes only, by and between the City of Torrance ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. WHEREAS, Grantee and LACMTA entered into that certain Funding Agreement No. 920000000MR31260, dated January 15, 2015, which was amended on July 9, 2018, August 31, 2019, August 15, 2020, September 23, 2021, July 1, 2022, and September 29, 2023 (as amended, the "Existing FA"), which Existing FA provides for the Project Approval and Environmental Document (PAED), Plans, Specifications and Estimates (PS&E), and Construction of Crenshaw Boulevard from Del Amo Boulevard to Dominguez Street Improvements (the “Project”); and
B. WHEREAS, the LACMTA Board on January 26, 2023 delegated administrative authority to staff to extend funding lapsing dates of the Measure R Funds previously approved to meet PAED, PS&E, ROW and Construction time frames; and C. WHEREAS, the LACMTA Board on September 23, 2021, delegated administrative authority to staff to extend the funding lapsing date of the Measure M Funds previously approved to meet environmental, design, right-of-way and construction time frames; and D. WHEREAS, Grantee and LACMTA desire to extend the lapsing date of FY 2015-16 in Measure R funds to June 30, 2027; and
E. WHEREAS, Grantee and LACMTA desire to extend the lapsing date of FY 2021-22 in Measure M funds to June 30, 2027; and
F.
herein.

WHEREAS, Grantee and LACMTA desire to amend the Existing FA as provided AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles, CA 90012
Rev: 10.26.2022 1 Measure R Funding Agreement Amendment Highways – General
20 FTIP# LA0G1010
Subregion ID: South Bay
Project#: MR312.60/MM5508.17
Amendment No.7
FA # 920000000MR31260
Attention: Minji Kwon, 99-18-2
(213)–410–8718
[email protected] ”

2. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“6.1 GRANTEE shall submit the draft of Quarterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for review and pre-approval of the applicable report. LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should GRANTEE fail to submit either the draft or pre-approved reports within five (5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse GRANTEE until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, GRANTEE will still be required to submit the Quarterly Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then GRANTEE can submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement”

4. Part II, Section 9.1 (vii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “(vii) Expending the Funds granted under this FA for allowable costs by the lapsing date. All Measure R Funds programmed for FY 2015-16 are subject to lapse by June 30, 2027.”

5. Part II, Section 9.1 (viii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “(viii) Expending the Funds granted under this FA for allowable costs by the lapsing date. All Measure M Funds programmed FY 2021-22 are subject to lapse by June 30, 2027.”

6. Part II, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“12. COMMUNICATIONS:

12.1 GRANTEE shall ensure that all Communication Materials contain recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding Recipient Communications Guidelines” available online at Rev: 10.26.2022 2 Measure R Funding Agreement Amendment Highways – General
21 FTIP# LA0G1010
Subregion ID: South Bay
Project#: MR312.60/MM5508.17
Amendment No.7
FA # 920000000MR31260
http://metro.net/partners-civic . The Funding Recipient Communications Guidelines may be changed from time to time during the course of this Agreement. GRANTEE shall be responsible for complying with the latest Funding Recipient Communications Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this Agreement, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites, radio and public service announcements, electronic media, and construction site signage. A more detailed definition of “Communications Materials” is found in the Funding Recipient Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding Recipients to use is included in the Funding Recipient Communications Guidelines.

12.4 GRANTEE sh all ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shall be responsible for monitoring GRANTEE’s compliance with the terms and conditions of this Section. GRANTEE’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

7. Attachment A-2 of the Existing FA is hereby replaced by Attachment A-3, attached.

8. Attachment B-1-6 of the Existing FA is hereby replaced by Attachment B-1-7, attached.

9. Attachment C-6 of the Existing FA is hereby replaced by Attachment C-7, attached.

The parties have agreed that the Monthly Progress Report is no longer required and10. therefore, Attachment D-1 and all references thereto are hereby deleted.

11. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged .

Rev: 10.26.2022 3 Measure R Funding Agreement Amendment Highways – General
22 FTIP# LA0G1010
Subregion ID: South Bay
Project#: MR312.60/MM5508.17
Amendment No.7
FA # 920000000MR31260
IN WITNESS WHEREOF, the parties have caused this Amendment No. 7 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________
Stephanie Wiggins
Date: ____________________
Chief Executive Officer
APPROVED AS TO FORM:

Dawyn R. Harrison
County Counsel
By: ______________________ Date:
_
J
_
u
_
l y
_
6 _
,
_
2 _
0 _
2 _
6 _____
______
Deputy
GRANTEE:

CITY OF TORRANCE
By: _______________________________________ Date: ____________________ Sharon Kalani
City Mayor
APPROVED AS TO FORM:

Patrick Q. Sullivan
City Attorney
By: _______________________________________
ATTEST:

Date: ____________________
Date: ____________________By: _______________________________________ Rebecca Poirier, MMC
City Clerk
Rev.: 05.20.2025 4 Measure R Funding Agreement Amendment Highways – General
23 ATTACHMENT A-3 -PROJECT FUNDING
Measure R and Measure M Programs - Funding Agreement Projects - FA#: 9200000000MR 31260 A-7 Project Title: Crenshaw Boulevard from Del Amo Boulevard to Dominguez Street Improvements Project ID#: MR 312.60

PROGRAMMED BUDGET - SOURCES OF FUNDS
Total
Budget
% of BudgetSOURCES OF FUNDS FY2014-15 FY2015-16 FY2021-22 FY2022-23 FY2023-24 FY2025-26

LACMTA PROGRAMMED FUNDING
Measure R Highway Op Funds

MEASURE M MSP FUNDS

SUM PROG LACMTA FUNDS
$
$
1,800,000 $ 1,500,000
1,800,000 $ 1,500,000
$
$
$
3,300,000 57%
$ 609,000
609,000
609,000 11%
67%$ $ - $ - $
$
- 3,909,000
OTHER NON LACMTA FUNDING:

LOCAL: $ 1,798,348 86,952 $
$
$
$
1,885,300 33%
0%
0%
0%
STATE: -
-
-
FEDERAL:

PRIVATE OR OTHER:

SUM NON-LACMTA FUNDS $
$
1,798,348 $ - $
$
- $ -
-
$ -
-
$
$
86,952
86,952
$
$
1,885,300
5,794,300
33%
TOTAL PROJECT FUNDS 3,598,348 $ 1,500,000 609,000 $ $ 100% Measure R and Measure M FA
Attachment A - Project Funding

02.02.23 24

ATTACHMENT B-1-7 - EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure R and Measure M Programs - Funding Agreement Projects - FA#: 920000000MR31260 A-7 Project Title: Crenshaw Boulevard from Del Amo Boulevard to Dominguez Street Improvements Project#: MR312.60/MM5508.17

PROGRAMMED SOURCES OF FUNDS
FY 2025-26
Qtr 1
FY 2025-26
Qtr 2
FY 2025-26
Qtr 3
FY 2025-26
Qtr 4
FY 2026-27
Qtr 1
FY 2026-27
Qtr 2
FY 2026-27
Qtr 3
FY 2026-27
Qtr 4
TOTAL
BUDGETSOURCES OF FUNDS Prior Years
LACMTA PROGRAMMED FUNDS:

MEASURE R FUNDS:

PAED $30,205 $30,205
PS&E
ROW Support
$133,115 $133,115
$0
Construction Support
ROW
$233,574 $233,574
$0
Construction $2,902,261
$3,299,155
$845
$845
$2,903,106
$3,300,000Total MEASURE R $0 $0 $0 $0 $0 $0 $0
MEASURE M FUNDS:

PAED
PS&E
$0
$0
ROW Support
Construction Support
ROW
$0
$107,443
$0
$71,279 $11,832 $24,331
Construction
Total MEASURE M
$501,557
$572,836
$3,871,992
$501,557
$609,000
$3,909,000
$11,832
$11,832
$0
$0
$0
$0
$24,331
$25,176
$0
$0
$0
$0
$0
$0
$0
$0SUM PROG LACMTA FUNDS:

OTHER NON LACMTA FUNDING:

LOCAL: Gas Tax
PAED
PS&E
$0
$0
ROW Support
Construction Support
ROW
Construction
Total LOCAL
$0
$418,157
$0
$412,108
$830,265
$331,205 $86,952
$86,952
$412,108
$743,313 $0 $0 $0 $0 $0 $0 $0
Local: Local Contribution
PAED
PS&E
$0
$0
ROW Support
Construction Support
ROW
$0
$47,227
$0
$47,227
Construction
Total LOCAL
$1,007,808
$1,055,035
$1,798,348
$1,007,808
$1,055,035
$1,885,300
$0
$0
$0
$0
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$0SUM NON-LACMTA FUNDS : $86,952

PROJECT FUNDING
FY2025-26 and FY2026-27

SUMMARY OF ALL FUNDS
PAED
PS&E
ROW Support
Construction Support
ROW
Construction
$5,670,339 $11,832 $0 $0 $112,128 $0 $0 $0 $0 $5,794,300 $30,205
$133,115
$0
$683,285
$0
$4,823,734
$5,670,339
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$30,205
$133,115
$0
$806,401
$0
$4,824,579
$5,794,300
$11,832
$0
$111,283
$0
$0 $845
TOTAL MILESTONES $11,832 $112,128

TOTAL LACMTA FUNDS

TOTAL NON-LACMTA FUNDS

TOTAL PROJECT FUNDING
$3,871,992
$1,798,348
$5,670,339
$11,832
$0
$0
$0
$0
$0
$0
$0
$25,176
$86,952
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3,909,000
$1,885,300
$5,794,300$11,832 $112,128
Measure R and Measure M FA
Attachment B-1 - Expenditure Plan02.02.23 1 of 1
25 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
ATTACHMENT C-7

SCOPE OF WORK
PROJECT TITLE:

Crenshaw Boulevard from Del Amo Boulevard to Dominguez Street Improvements PROJECT LOCATION:

The project is located on Crenshaw Boulevard from 208th Street to the Torrance Transit Center in the City of Torrance, in the County of Los Angeles.

PROJECT LIMITS:

The project limits are on Crenshaw Boulevard from approximately 208th Street to the Torrance Transit Center.

NEXUS TO HIGHWAY OPERATION, DEFINITION/PROJECT PURPOSE:

This project will environmentally clear, design, and construct intersection improvements on Crenshaw Boulevard at 208th Street and the Torrance Transit Center entrance and extend 208th Street to the west. These improvements will enhance capacity and improve operations, providing relief to I-405 by improving operations on a parallel route.

PROJECT BUDGET:

COMPONENT Measure R Funds Measure M Funds Non-LACMTA Funds PAED
PS&E
R/W Support
$30,205
$133,115
$0
R/W Capital $0
Construction Support
Construction Capital
Total
$233,574
$2,902,261
$3,300,000
$107,443
$501,557
$609,000
$5,794,300
$465,384
$1,419,916
$1,885,300
Total Project Budget
SCOPE:

Crenshaw Boulevard is a primary north-south arterial route for Torrance and the entire south bay region. This segment carries approximately 50,000 vehicles per day and provides primary access to/from the I-405 Freeway.

The intersection improvements on Crenshaw Boulevard at 208th Street, the Transit Center entrance, and the extensions of 208th Street, will improve the intersection operations and provide additional storage capacity; these improvements will also minimize impact of right-turning traffic on Crenshaw Boulevard thereby allowing more vehicles to flow through each of the intersections with the same allotted green time. Adding capacity to these intersections will reduce traffic delays and improve safety conditions along this arterial.

Proposed improvements for each intersection are as follows:

Rev: 02.02.23 1 Measure R and Measure M FA
Attachment C – Scope of Work
26 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
•
•
•
Crenshaw Boulevard at Torrance Transit Center - Construct a southbound right turn lane within the existing right of way, utility relocation, and installation of a new traffic signal; and Crenshaw Boulevard at 208th Street - Construct a southbound right turn lane within the existing right of way, utility relocation, and traffic signal improvements; and Design and construction of the new 208th Street west at Crenshaw Boulevard. 208th Street will be extended to the west and will be a two lane cul-de-sac that will include curb, gutter, sidewalk improvements, street lighting, underground utilities and traffic signal work DESIGN:

I. Preliminary Design: Consultant and City of Torrance Staff to Perform this Task A. Account for field visits of the project area to identify design issues. Record existing site conditions in photographs and/or video.

B. Read, review and understand all aspects and goals of the Lead Agency’s General Plan Circulation Element and, as these plans pertain to the widening and ultimate build-out of the three intersections.

C. Incorporate provided layout plans to be incorporated into the final design.

D. Provide a complete survey of the project area, establishing horizontal and vertical control for the project. Mapping shall include topographic features within 50 feet of project area.

E. Identify and coordinate with all utilities in the project area to facilitate the final design of the Project.

F. Conduct geotechnical investigations of the three intersections.

G. Identify potential right-of-way acquisitions, and/or vacations to provide for the optimal alignment of Road, which shall incorporate roadway widening, development build outs and preservation of existing improvements and scenic character of the area.

H. Identify street pavement structural sections for project area.

I. Identify all drainage/BMP structure improvements, based upon hydrology, hydraulic calculations and water quality issues. Structural BMPs shall be incorporated into the street design for storm water quality improvements prior to entering natural waterways.

J. Prepare and submit a Report identifying the ultimate alignment of roadway improvements, as well as the recommended ultimate repair strategy as part of the Report, the Consultant shall prepare and provide CAD drawings of the proposed alignment, which shall include vertical and horizontal alignment, improvements, and drainage/BMP structures. Right-of-way acquisitions and/or vacations shall be clearly identified.

K. Prepare and submit an Engineer’s construction cost estimate for all recommended improvements identified in the Report.

II. Environmental Analysis: Consultant to perform the following tasks:

Rev: 02.02.23 2 Measure R and Measure M FA
Attachment C – Scope of Work
27 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
A. Define a complete and detailed project description and delineate project study areas that will meet the needs of technical analyses and Initial Study/Mitigated Negative Declaration (IS/MND).

B. Conduct the required technical analysis for the project.

C. Prepare, following completion of appropriate technical analysis, an Administrative Draft IS, consistent with CEQA Guidelines Appendix G, for review and approval by the City.

D. Prepare the Draft IS and Draft MND for public circulation.

E. Prepare responses to public review of Draft and prepare a Final MND and submit for review to the City.

F. Prepare an MMRP.

G. Coordinate with the City and prepare permit applications/notifications for the Project as applicable.

H. Delineation of the Waters of the US will be conducted within the ESL if applicable.

I. Prepare a final Tree report and map.

III. Final Design – Plans, Specifications and Estimates A. Design the ultimate build out of the three intersections.

B. Prepare civil roadway plans for the required improvements, consistent with City format.

At a minimum, the plan set shall include Title Sheet, Site Plan, General Construction Notes, Horizontal Control, Typical Sections and Details, Plan and Profile, Drainage/BMP Structure(s) Details, Traffic Striping/Signage/Signal Plans, Street Lighting/Electrical, Bike Lane Plans, and Median/Landscaping Plans.

C. Submittal of plan set shall be delivered at 50% and 90% complete and final (five (5) sets per submittal). When project is complete, the Consultant shall provide AutoCAD files for all plan sheets.

D. Assist the City for the Community Information Workshop after the 90%submittal by preparing exhibits and attending workshop and be prepared to discuss concerns of the property owners along Pacific Coast Highway and Hawthorne Blvd., particularly with issues of right-of-way acquisition.

E. Prepare construction specifications consistent with City format (SSPWC “Greenbook” APWA, current edition with updates.

F. Submittal of specifications shall be delivered to the City at 90%complete and final.

When project is complete, the Consultant shall provide a digital file of specification package in Microsoft Word format for Windows.

G. Prepare an engineer’s construction cost estimate based on the itemized quantity take-off from the contract documents.

H. Submittal of the engineer’s construction cost estimate shall be delivered to the City at 90% complete and final in a spreadsheet format.

IV. Project Management and Preparation of Periodic Updated Schedule, Deliverables and Meetings : Consultant and City of Torrance Staff to perform the following:

A. Meet as needed with the City to accomplish Project tasks as outlined. Meetings expected between the Consultant and City, shall be and not be limited to: Project Kick-off Rev: 02.02.23 3 Measure R and Measure M FA
Attachment C – Scope of Work
28 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
Meeting, presentation of “Summary Letter Report”, progress meetings and preparation for the Community Information Workshop at 90% design completion.

B. Provide periodic schedule updates on deliverables and meetings as changes to original schedule occur or as needed based on the needs of the project.

V. CONSTRUCTION:

Lead Agency expects to provide construction oversight, procure a consultant for construction management and let a low bid contract for construction and to perform the following tasks:

A. Conduct a “Ground Breaking” ceremony for the project.

B. Contract with a separate engineering firm to provide Construction Management for the Project. This will be accomplished through an RFP.

C. Contract with a Contractor for construction.

D. Conduct a “Ribbon Cutting” ceremony at the completion of the Project.

The Design Consultant shall meet as needed with the Grantee to accomplish Project tasks as outlined. Meetings expected between the Consultant and Grantee shall include, but not be limited to, Pre-Construction Meeting, progress meetings and preparation of responses to RFIs.

Rev: 02.02.23 4 Measure R and Measure M FA
Attachment C – Scope of Work
29 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
MILESTONES : The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE

SOLICITATION (BID/PROPOSAL)
Fully Executed Contract

PRELIMINARY DESIGN
PA&ED
2/15
2/15
4/15
5/15
6/15
4/15
4/15
5/15
10/15
1/16PS&E
CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows. Please include all applicable milestones and provide any additional specific activities that are not currently listed under “other.”

START DATE COMPLETION DATE
4/18SOLICITATION (BID/PROPOSAL)
Solicitation Response
Evaluations
6/16
8/17
11/17
11/17
3/18
11/17
1/18
2/18
3/18
4/18
Selection
Contract Award
Fully Executed Contract

EXCAVATION
4/18
Clear/Grub
Survey
Grading
10/20
10/20
5/21
12/20
12/20
5/21
Compaction 4/21 5/21

ENVIRONMENTAL

CONCRETE
6/16 8/16
Form Work
Rebar Placement

LANDSCAPE
1/22
1/22
4/22
4/22
General Construction/close out project

CHANGE ORDERS
Claims
6/23
6/23
6/26
6/26
Rev: 02.02.23 5 Measure R and Measure M FA
Attachment C – Scope of Work
30 FTIP#: LA0G1010 Project ID#: MR312.60/MM5508.17
Amendment No. 7Subregion ID: Interstate 405, I-110, I-105, and SR-91 Ramp and Interchange Improvements
(South Bay)
FA#920000000MR312.60 A-7
ATTACHMENT C – Location Map(s)
Rev: 02.02.23 6 Measure R and Measure M FA
Attachment C – Scope of Work
31 FTIP# LA0G1763
Subregion ID: South Bay
Project#: MR312.63
Amendment No.1
FA # 9200000000MR31263

Rev: 10.26.2022 1 Measure R Funding Agreement Amendment Highways – General

AMENDMENT No.1 TO MEASURE R FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY

This Amendment No. 1 to the Funding Agreement (this “Amendment”), is dated February 23, 2026, for reference purposes only, by and between the City of Torrance ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. Grantee and LACMTA entered into that certain Funding Agreement No. 9200000000MR31263, dated February 15, 2020 (the “Existing FA”), which Existing FA provides for the Pacific Coast Highway (PCH) at Crenshaw Blvd Intersection Improvement Project (the “Project”); and

B. WHEREAS, the LACMTA Board on January 26, 2023 delegated administrative authority to staff to extend funding lapsing dates to meet PAED, PS&E, ROW and Construction time frames; and

C. WHEREAS, the Grantee and LACMTA desire to extend the lapsing date of Fiscal Year (FY) 2019-20 funds to June 30, 2027; and

D. Grantee and LACMTA desire to amend the Existing FA as provided herein.

AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles, CA 90012
Attention: Minji Kwon, 99-18-2
(213)–410–8718
[email protected]”

2. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

ATTACHMENT 5
32 ATTACHMENT 5
FTIP# LA0G1763
Subregion ID: South Bay
Project#: MR312.63
Amendment No.1
FA # 9200000000MR31263

Rev: 10.26.2022 2 Measure R Funding Agreement Amendment Highways – General

“6.1 GRANTEE shall submit the draft of Quarterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for review and pre-approval of the applicable report. LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should GRANTEE fail to submit either the draft or pre-approved reports within five (5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse GRANTEE until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, GRANTEE will still be required to submit the Quarterly Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then GRANTEE can submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement”

3. Part II, Section 9.1 (vii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “(vii) Expending the Funds granted under this FA for allowable costs by the lapsing date. All Funds programmed for FY2019-20 are subject to lapse by June 30, 2027.”

4. Part II, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:

“12. COMMUNICATIONS:

12.1 GRANTEE shall ensure that all Communication Materials contain recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding Recipient Communications Guidelines” available online at http://metro.net/partners-civic. The Funding Recipient Communications Guidelines may be changed from time to time during the course of this Agreement. GRANTEE shall be responsible for complying with the latest Funding Recipient Communications Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this Agreement, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and 33 FTIP# LA0G1763
Subregion ID: South Bay
Project#: MR312.63
Amendment No.1
FA # 9200000000MR31263

Rev: 10.26.2022 3 Measure R Funding Agreement Amendment Highways – General

construction site signage. A more detailed definition of “Communications Materials” is found in the Funding Recipient Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding Recipients to use is included in the Funding Recipient Communications Guidelines.

12.4 GRANTEE shall ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shall be responsible for monitoring GRANTEE’s compliance with the terms and conditions of this Section. GRANTEE’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

5. Attachment B-1 of the Existing FA is hereby replaced by Attachment B-1-1, attached.

6. Attachment C – Scope of Work of the Existing FA is hereby amended by deleting the Milestones Schedule and replacing it with the following Revised Milestones Schedule:

MILESTONES: The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE

SOLICITATION (BID/PROPOSAL)
Receive FA from Metro and execute January 2020 December 2020 Develop Solicitation Package August 2020 May 2021
Solicitation Response June 2021 September 2021
Evaluations October 2021 March 2022
Contract Award April 2022 April 2022
Fully Executed Contract May 2022 May 2022

PLANNING
Prepare Concept Report May 2022 December 2025
Prepare Project Study Report (PSR) January 2026 April 2026

7. The parties have agreed that the Monthly Progress Report is no longer required and therefore, Attachment D-1 and all references thereto are hereby deleted.

8. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged. 34 FTIP# LA0G1763
Subregion ID: South Bay
Project#: MR312.63
Amendment No.1
FA # 9200000000MR31263
Rev.: 05.20.2025 4 Measure R Funding Agreement Amendment Highways – General
IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to the FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________ Date: ____________________ Stephanie Wiggins
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: ________________________________________ Date: ____________________ Deputy
GRANTEE:

CITY OF TORRANCE
By: _______________________________________ Date: ____________________ Sharon Kalani
City Mayor
APPROVED AS TO FORM:

By: _______________________________________ Date: ____________________ Patrick Q. Sullivan
City Attorney
ATTEST:

By: _______________________________________ Date: ____________________ Rebecca Poirier, MMC
City Clerk
March 13, 2026
35 ATTACHMENT 6
FTIP# LA0G358
Subregion ID: South Bay
Project#: MR312.23/ MM5508.16
Amendment No. 7
Funding Agreement# MOU.MR312.23
AMENDMENT No.6 TO AMENDED & RESTATED MEASURE R FUNDING AGREEMENT

BETWEEN CITY OF TORRANCE AND THE LOS ANGELES COUNTY

METROPOLITAN TRANSPORTATION AUTHORITY
This Amendment No. 6 to the Amended & Restated Funding Agreement (this “Amendment”), is dated April 22, 2026, for reference purposes only, by and between the City of Torrance ("Grantee") and the Los Angeles County Metropolitan Transportation Authority ("LACMTA").

RECITALS:

A. WHEREAS, Grantee and LACMTA entered into that certain Funding Agreement No.

MOU.MR312.23, dated August 22, 2011, which was amended and restated on January 14, 2013, and amended on December 14, 2017, August 31, 2019, August 15, 2020, September 23, 2021, and September 29, 2023 (as amended, the "Existing FA"), which Existing FA provides for the Torrance Transit Park and Ride Regional Terminal Project (the “Project”); and
B. WHEREAS, the LACMTA Board on January 26, 2023 delegated administrative authority to staff to extend funding lapsing date of the Measure R Funds to meet PAED, PS&E, ROW and Construction time frames; and
C. WHEREAS, the LACMTA Board on September 23, 2021, delegated administrative authority to staff to extend the funding lapsing date of the Measure M Funds previously approved to meet environmental, design, right-of-way and construction time frames; and D. WHEREAS, the Grantee and LACMTA desire to extend the lapsing date of FY 2018- 19 Measure R funds and FY 2021-22 Measure M funds to June 30, 2027; and E.
herein.

WHEREAS, Grantee and LACMTA desire to amend the Existing FA as provided AGREEMENT:

NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows:

1. Part I, Paragraph 11 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“Los Angeles County Metropolitan Transportation Authority One Gateway Plaza
Metro HQ
Los Angeles, CA 90012
Attention: Minji Kwon, 99-18-2
(213)–410–8718
[email protected] ”
Rev: 10.26.2022 1 Measure R Funding Agreement Amendment Highways – General
36 FTIP# LA0G358
Subregion ID: South Bay
Project#: MR312.23/ MM5508.16
Amendment No. 7
Funding Agreement# MOU.MR312.23

2. Part II, Paragraph 6.1 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“6.1 GRANTEE shall submit the draft of Quarterly Progress/Expenditure Report (Attachment D-2) within sixty (60) days after the close of each quarter on the last day of the months November, February, May and August to the LACMTA Project Manager for review and pre-approval of the applicable report. LACMTA Project Manager shall review and respond in writing to the draft Quarterly Progress/Expenditure Reports within thirty (30) calendar days from receipt. Grantee shall submit the LACMTA pre-approved Quarterly Progress/Expenditure Report no later than five (5) days after receipt of LACMTA’s written approval. Should GRANTEE fail to submit either the draft or pre-approved reports within five (5) days of the due date and/or submit incomplete reports, LACMTA will not reimburse GRANTEE until the completed required reports are received, reviewed, and approved. The Quarterly Progress/Expenditure Reports shall include all appropriate documentation (such as contractor invoices, timesheets, receipts, etc.), and any changes to interim milestone dates that do not impact the final milestone date. All supporting documents must include a clear justification and explanation of their relevance to the Project. If no activity has occurred during a particular quarter, GRANTEE will still be required to submit the Quarterly Progress/Expenditure Reports indicating no dollars were expended that quarter. If a request for reimbursement exceeds $500,000 in a single month, then GRANTEE can submit such an invoice once per month with supporting documentation. Expenses that are not invoiced to LACMTA Accounts Payable within ninety (90) days after the lapsing date specified in Part II, Section 9.1 below are not eligible for reimbursement”

3. Part II, Section 9.1 (vii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “(vii) Expending the Measure R Funds granted under this FA for allowable costs by the lapsing date. All Funds programmed for FY 2011-12, FY 2012-13, and FY 2013-14 have been expended and are no longer available. All Funds programmed for FY 2018-19 are subject to lapse by June 30, 2027.”

4. Part II, Section 9.1 (viii) of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following: “(viii) Expending the Measure M Funds granted under this FA for allowable costs by the lapsing date. All Funds programmed for FY 2021-22 are subject to lapse by June 30, 2027.”

5. Part II, Paragraph 12 of the Existing FA is hereby amended by deleting it in its entirety and replacing it with the following:
“12. COMMUNICATIONS:

12.1 GRANTEE shall ensure that all Communication Materials contain recognition of LACMTA’s contribution to the Project as more particularly set forth in “Funding Recipient Communications Guidelines” available online at http://metro.net/partners-civic . The Funding Recipient Communications Guidelines may be changed from time to time during the course of this Agreement. GRANTEE shall be Rev: 10.26.2022 2 Measure R Funding Agreement Amendment Highways – General
37 FTIP# LA0G358
Subregion ID: South Bay
Project#: MR312.23/ MM5508.16
Amendment No. 7
Funding Agreement# MOU.MR312.23
responsible for complying with the latest Funding Recipient Communications Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer.

12.2 For purposes of this Agreement, “Communications Materials” include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and construction site signage. A more detailed definition of “Communications Materials” is found in the Funding Recipient Communications Guidelines.

12.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. The preferred logo lock-up for Funding Recipients to use is included in the Funding Recipient Communications Guidelines.

12.4 GRANTEE sh all ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section.

12.5 The LACMTA Project Manager shall be responsible for monitoring GRANTEE’s compliance with the terms and conditions of this Section. GRANTEE’s failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein.”

6. Attachment A-4 of the Existing FA is hereby replaced by Attachment A-5, attached.

7. Attachment B-1-5 of the Existing FA is hereby replaced by Attachment B-1-6, attached.

8. Attachment C-5 – Scope of Work of the Existing FA is hereby amended by deleting the Milestones Schedule and replacing it with the following Revised Milestones Schedule:

MILESTONES : The implementation schedule for this project will be as follows.

START DATE COMPLETION DATE
4/15SOLICITATION (BID/PROPOSAL)
Fully Executed Contract

PRELIMINARY DESIGN
PA&ED
2/15
2/15
4/15
5/15
6/15
4/15
5/15
10/15
1/16PS&E
CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows. Please include all applicable milestones and provide any additional specific activities that are not currently listed under “other.”

START DATE COMPLETION DATE
4/18SOLICITATION (BID/PROPOSAL)
Rev: 10.26.2022
6/16
3 Measure R Funding Agreement Amendment
Highways – General
38 FTIP# LA0G358
Subregion ID: South Bay
Project#: MR312.23/ MM5508.16
Amendment No. 7
Funding Agreement# MOU.MR312.23
Solicitation Response
Evaluations
Selection
Contract Award
Fully Executed Contract
8/17 11/17
1/18
2/18
3/18
4/18
11/17
11/17
3/18
4/18

EXCAVATION
Clear/Grub
Survey
Grading
10/20
10/20
5/21
12/20
12/20
5/21
Compaction 4/21 5/21

ENVIRONMENTAL

CONCRETE
6/16 8/16
Form Work
Rebar Placement

LANDSCAPE
1/22
1/22
4/22
4/22
General Construction/close out project

CHANGE ORDERS
Claims
6/23
6/23
6/26
6/26

9. The parties have agreed that the Monthly Progress Report is no longer required and therefore, Attachment D-1 and all references thereto are hereby deleted.

10. Except as expressly amended hereby, the Existing FA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing FA that are not expressly amended by this Amendment shall remain unchanged .

Rev: 10.26.2022 4 Measure R Funding Agreement Amendment Highways – General
39 FTIP# LA0G358
Subregion ID: South Bay
Project#: MR312.23/ MM5508.16
Amendment No. 7
Funding Agreement# MOU.MR312.23
IN WITNESS WHEREOF, the parties have caused this Amendment No. 6 to the Restated & Amended FA to be executed by their duly authorized representatives as of the dates indicated below:

LACMTA:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY By: ________________________________________
Stephanie Wiggins
Date: ____________________
Chief Executive Officer
APPROVED AS TO FORM:

DAWYN R. HARRISON
County Counsel
By: __ ____________________ Date:
__
Ju
_
ly
__
6,
_
2 _
0 _
2 _
6 ________
___
Date: ____________________
Deputy
GRANTEE:

CITY OF TORRANCE
By: _______________________________________
Sharon Kalani
City Mayor
APPROVED AS TO FORM:

Patrick Q. Sullivan
City Attorney
By: _______________________________________
ATTEST:

Date: ____________________
Date: ____________________By: _______________________________________ Rebecca Poirier, MMC
City Clerk
Rev.: 05.20.2025 5 Measure R Funding Agreement Amendment Highways – General
40 ATTACHMENT A-5 -PROJECT FUNDING
Measure R and Measure M Programs - Funding Agreement Projects - FA#: 9200000000MR 312.23 A-7 Project Title: Torrance Transit Park and Ride Regional Terminal Project Project ID#: MR 312.23

PROGRAMMED BUDGET - SOURCES OF FUNDS
Total
Budget
% of BudgetSOURCES OF FUNDS Prior Years FY2011-12 FY2012-13 FY2013-14 FY2018-19 FY2021-22 FY2025-26 FY2026-27

LACMTA PROGRAMMED FUNDING
Measure R Highway Op Funds

MEASURE M MSP FUNDS

SUM PROG LACMTA FUNDS
$ 1,000,000 $ 10,500,000
$ 1,000,000 $ 10,500,000
$ 6,600,000
6,600,000
$
$
7,600,000
7,600,000
$
$
$
25,700,000 81%
5%$ 1,631,000
1,631,000
1,631,000
$ - $ $ 27,331,000 86%
OTHER NON LACMTA FUNDING:

LOCAL: City, LA County, Other $
$
420,094 $ 6,567 $
$
753,865
11,508
$
$
1,180,526
3,333,767
4%
STATE: Prop 1B PTMISEA, LCTOP

SUM NON-LACMTA FUNDS

TOTAL PROJECT FUNDS
3,322,259 10%
$
$
3,742,353 $ - $ - $
$
- $
$
- $
$
- $
$
6,567
6,567
$ 765,373 $
$
4,514,293 14%
3,742,353 $ 1,000,000 $10,500,000 6,600,000 7,600,000 1,631,000 $ 765,373 31,845,293 100% Measure R and Measure M FA
Attachment A - Project Funding

02.02.23 41

ATTACHMENT B-1-6- EXPENDITURE PLAN COST & CASH FLOW BUDGET Measure R and Measure M - Funding Agreement Projects - FA# 9200000000MR31223 A-7 Project Title: Torrance Transit Park and Ride Regional Terminal Project#: MR312.23

PROGRAMMED SOURCES OF FUNDS
FY 2025-26
Qtr 1
FY 2025-26
Qtr 2
FY 2025-26
Qtr 3
FY 2025-26
Qtr 4
FY 2026-27
Qtr 1
FY 2026-27
Qtr 2
FY 2026-27
Qtr 3
FY 2026-27
Qtr 4
TOTAL
BUDGETSOURCES OF FUNDS Prior Years
LACMTA PROGRAMMED FUNDS:

MEASURE R FUNDS:

PAED
PS&E
ROW Support
Construction Support
ROW
$1,000,000
$1,379,119
$1,000,000
$1,379,119
$0
$677,157
$4,500,000
$18,125,630
$677,157
$4,500,000
$18,143,724
$25,700,000
Construction $18,094
$18,094Total MEASURE R $25,681,906
MEASURE M FUNDS:
$0 $0 $0 $0 $0 $0 $0
PAED
PS&E
$0
$0
ROW Support
Construction Support
ROW
$0
$243,045
$0
$243,045
Construction $1,140,114
$1,140,114
$26,822,020
$4,796
$4,796
$22,891
$243,045
$486,090
$486,090
$1,387,955
$1,631,000
$27,331,000
Total MEASURE M $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0SUM PROG LACMTA FUNDS:

PROJECT FUNDING
FY2025-26 and FY2026-27 $26,822,020 $22,891 $0 $0 $0 $0 $0 $0 $486,090 $27,331,000 OTHER NON LACMTA FUNDING:

LOCAL: City, LA County, Other
PAED $0
PS&E $0
$0
$0
ROW Support
Construction Support
ROW $0
Construction
Total LOCAL
$420,094
$420,094
$6,567
$6,567
$753,865
$753,865
$1,180,526
$1,180,526$0 $0 $0 $0 $0 $0
STATE: Prop 1B PTMISEA , LCTOP
PAED
PS&E
$0
$0
ROW Support
Construction Support
ROW
$0
$0
$0
Construction
Total STATE
$3,322,259
$3,322,259
$3,742,353
$11,508
$11,508
$3,333,767
$3,333,767
$4,514,293
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0SUM NON-LACMTA FUNDS : $6,567 $765,373

PROJECT FUNDING
FY2027-28 and FY2028-29

SUMMARY OF ALL FUNDS
PAED
PS&E
ROW Support
Construction Support
ROW
Construction
$3,742,353 $0 $6,567 $0 $0 $0 $0 $0 $765,373 $4,514,293 $1,000,000
$1,379,119
$0
$677,157
$4,500,000
$23,008,096
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,000,000
$1,379,119
$0
$920,202
$4,500,000
$24,045,972
$31,845,293
$243,045
$0
$1,008,418
$1,251,462
$22,891
$22,891
$6,567
$6,567TOTAL MILESTONES $30,564,372
TOTAL LACMTA FUNDS $26,822,020 $22,891
$0
$0
$6,567
$6,567
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$486,090
$765,373
$27,331,000
$4,514,293
$31,845,293

TOTAL NON-LACMTA FUNDS

TOTAL PROJECT FUNDING
$3,742,353
$30,564,372 $22,891 $1,251,462
Measure R and Measure M FA
Attachment B-1 - Expenditure Plan02.02.23 1 of 1