MEETING DATE: JULY 21, 2026
TO: ALDO E. SCHINDLER, CITY MANAGER
FROM: MICHAEL GRISSO, DIRECTOR OF PUBLIC WORKS
SUBJECT: APPROVE CONSULTANT SERVICES AGREEMENT FOR

ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD

REHABILITATION PARKWAY PROJECT
SUMMARY:

Staff is recommending the City Council approve a Consultant Services Agreement with Michael Baker International for engineering design services for the Jamboree Road Rehabilitation Project and a Cooperative Agreement with the City of Irvine to establish each agency's cost-sharing responsibilities for improvements that fall within jurisdictional boundaries.

RECOMMENDATION:

It is recommended that the City Council:

1. Approve the Consultant Services Agreement with Michael Baker International for Engineering Design Services and authorize the City Manager to execute the Agreement on behalf of the City; and

2. Authorize the City Manager to approve change orders up to ten percent of the agreements negotiated fee to address unforeseen conditions; and

3. Authorize the Director of Public Works to approve a Cooperative Agreement with the City of Irvine for work within the City of Irvine’s jurisdiction boundary, incorporating minor modifications as to form and approved by the City Attorney.

FISCAL IMPACT:

The Fiscal Year 2026-2027 Capital Improvement Program Budget has allocated $1,050,000 from Measure M2 Fair Share for the design phase for this project. The proposed Consultant Services Agreement with Michael Baker International includes a not-to-exceed total compensation amount of $541,390.00. Pursuant to the Cooperative Agreement, the City of Irvine will reimburse the City $77,000 for its proportionate share of the engineering design

AGENDA REPORT
Agenda Item
Reviewed:

City Manager _______
Finance Director _______
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 8 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC City Council Agenda Report
Consultant Services Agreement
July 21, 2026

Page 2 ends

services associated with improvements that occur within Irvine's jurisdictional boundaries, with the remaining $464,390 as Tustin’s share.

CORRELATION TO THE STRATEGIC PLAN:

Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City’s Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy #5, which among other items, is to ensure continuous maintenance and improvement of transportation facilities.

BACKGROUND AND DISCUSSION:

Jamboree Road is a regionally significant principal arterial corridor that traverses both the Cities of Tustin and Irvine, providing access for residents, commuters, businesses, and regional travelers between Interstate 5 and communities to the north and west. Jamboree Road is a divided eight-lane roadway with Class II bikeways in both directions and supports high traffic volumes, with Average Daily Traffic ranging from 19,100 to 67,000 vehicles. To provide continuous rehabilitation across the jurisdictional boundary, the Cities of Tustin and Irvine are partnering to rehabilitate the corridor to a project limit that extends to Michelle Drive, with the City of Irvine contributing its proportionate share of the design and construction costs for improvements. The proposed Cooperative Agreement formalizes each agency's responsibilities and cost-sharing responsibilities, including Irvine's reimbursement of $77,000 toward engineering design services and its proportionate share of future construction costs for improvements within its jurisdiction.

The Jamboree Road Rehabilitation Project was awarded a $7,000,000 federal Surface Transportation Block Grant through the Southern California Association of Governments, administered by the Orange County Transportation Authority, to fund construction of the project. The proposed Consultant Services Agreement will provide the engineering design services necessary to advance the project to construction.

The project scope includes pavement resurfacing on Jamboree Road between Michelle Drive and Portola Parkway, including localized removal and reconstruction of asphalt failure areas, cold milling and asphalt overlay, ADA curb ramp upgrades, utility cover adjustments, replacement of traffic signal detector loops, replacement of pavement markers and striping, and bicycle lane improvements to enhance safety.

Staff developed a Request for Proposals (RFP) solicitation containing requirements and a scope of services detailing the need for professional engineering consulting services for the preparation of Plans, Specifications, and Engineer’s Estimate. The RFP was published on April 30, 2026, on the City's electronic public procurement platform, OpenGov, and distributed directly to known consultants/firms providing these services. The RFP submission deadline was June 1, 2026, and the process yielded eight (8) proposals, with all eight qualifying for further review.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC City Council Agenda Report
Consultant Services Agreement
July 21, 2026

Page 3 ends

The proposals were evaluated by a panel consisting of staff from the City's Public Works Department in accordance with the evaluation criteria identified in the RFP. Based on the initial proposal evaluations, the three highest-ranked firms were invited to participate in interviews:

1. Michael Baker International

2. BKF Engineers

3. Dokken Engineering
Following the interviews and completion of reference checks, the evaluation panel finalized the consultant rankings based on the following criteria:
• Qualification and Experience of Firm
• Approach and Work Plan
• Qualifications and Experience of the project manager and other key individuals • Schedule of Delivery
• Reference Checks
Michael Baker International (MBI) was ranked as the top-rated proposer based on the proposal evaluation, interview, and reference checks. The evaluation panel determined that MBI demonstrated the strongest understanding of the City's project objectives, including delivery of a federally funded arterial rehabilitation project requiring coordination with Caltrans Local Assistance, environmental clearance, and preparation of a bid-ready Plans, Specifications, and Engineer's Estimate (PS&E) package. MBI also demonstrated extensive experience delivering similar roadway rehabilitation projects for local agencies, a long-standing working relationship with the City of Tustin, and a project team familiar with the corridor through their recently completed topographic survey. Their proposed costs are within the City's budgetary expectations.

Based on these factors, staff is recommending the approval of the proposed Consultant Services Agreement with Michael Baker International for the engineering design services for the Jamboree Road Rehabilitation Project and approval of the Cooperative Agreement with the City of Irvine.
_____________________
Michael Grisso
Director of Public Works
Attachments:

1. Consultant Service Agreement

2. Cooperative Agreement with the City of Irvine
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ATTACHMENT 1
Consultant Service Agreement
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1

CONSULTANT SERVICES AGREEMENT
This Agreement for Consultant Services (herein “Agreement”) is made and entered into by and between the CITY OF TUSTIN, a municipal corporation ("City"), and MICHAEL BAKER INTERNATIONAL, INC., a Pennsylvania Corporation ("Consultant").

WHEREAS, City is in need of a qualified consultant to furnish professional engineering design services for the Jamboree Road Rehabilitation I-5 to Portola Parkway (CIP No. 70263); and
WHEREAS, Consultant is qualified to provide the necessary services and has agreed to provide such services to City; and
WHEREAS, City has prepared a Request for Proposal (RFP) dated April 2026, a copy of which is attached hereto as Exhibit "A" (referred to herein as the “Request for Proposal”.)
WHEREAS, Consultant submitted to City a proposal, dated June 1, 2026, a copy of which is attached hereto as Exhibit "B" (referred to herein as the “Proposal”.) WHEREAS, Consultant submitted to City a Fee proposal, dated June 1, 2026, a copy of which is attached hereto as Exhibit "C" (referred to herein as the “Fee Proposal”.)
NOW, THEREFORE, in consideration of the mutual agreements contained herein, City agrees to retain the services of Consultant, and Consultant agrees to provide consulting services as follows:

1. SERVICES OF CONSULTANT

1.1 Proposal and Scope of Services. In compliance with all terms and conditions of this Agreement, Consultant shall provide those services specified in the Proposal (the "services" or the "work"). The standard of care for all professional services performed or furnished by Consultant under this Agreement will be the care and skill used by members of Consultant’s profession practicing under similar circumstances at the same time and in the same locality (the “Standard of Care”).

1.1.1 Resolution of Inconsistencies Between Agreement and Proposal. In the event of any inconsistency between the terms contained in the Proposal and specific terms set forth in the main body of this Agreement, the terms set forth in the main body of this Agreement shall govern.

1.2 Compliance with Law. All services rendered hereunder shall be provided in accordance with all applicable Federal, state and local laws, ordinances, resolutions, statutes, rules, and regulations (collectively, the “Applicable Law”.) Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1

1.3 Licenses and Permits. Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by Applicable Law.

1.4 Familiarity with Work. By executing this Contract, Consultant warrants that Consultant (a) has thoroughly investigated and considered the work to be performed, (b) has investigated the site of the work and become fully acquainted with the conditions there existing, (c) has carefully considered how the work should be performed, and (d) fully understands the facilities, difficulties and restrictions attending performance of the work under this Agreement. Should the Consultant discover any latent or unknown conditions materially differing from those inherent in the work or as represented by the City, Consultant shall promptly inform City of such fact and shall not proceed with any work except at Consultant's risk until written instructions are received from the Contract Officer.

1.5 Care of Work. Consultant shall adopt and follow reasonable procedures and methods during the term of the Agreement to prevent loss or damage to materials, papers or other components of the work, and shall be responsible for all such damage until delivery of the work to the City.

1.6 Additional Services. Consultant shall perform services in addition to those specified in the Proposal when directed to do so in writing by the Contract Officer, provided that Consultant shall not be required to perform any additional services without compensation. Any additional compensation not exceeding ten percent (10%) of the original contract sum must be approved in writing by the Contract Officer. Any greater increase must be approved in writing by the City Manager.

2. COMPENSATION

2.1 Compensation of Consultant. For the services rendered pursuant to this Agreement, the Consultant shall be compensated and reimbursed only for such services and such amounts as are expressly prescribed in Exhibit “A”, in amounts that cumulatively shall not to exceed One Hundred Fifteen Thousand Dollars ($115,000). Notwithstanding any provision to the contrary in Exhibit A, the City will not compensate or reimburse Consultant for travel expenses or travel time except specific travel time and expenses approved in advance in writing by the Contract Officer.

2.2 Method of Payment. In any month in which Consultant wishes to receive payment, Consultant shall, no later than the first working day of such month, submit to City in the form approved by City's Director of Finance, an invoice for services rendered prior to the date of the invoice. City will pay Consultant for all undisputed expenses stated thereon which are approved by City consistent with this Agreement, within thirty (30) days of receipt by the Director of Finance of the invoice.

2.3 Changes. In the event any change or changes in the work is requested by City, the parties hereto shall execute an addendum to this Agreement, setting forth with particularity all terms of such addendum, including, but not limited Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
to, any additional Consultant's fees. Addenda may be entered into:

2.3.1 To provide for revisions or modifications to documents or other work product or work when documents or other work product or work is required by the enactment or revision of law subsequent to the preparation of any documents, other work product or work;

2.3.2 To provide for additional services not included in this Agreement or not customarily furnished in accordance with generally accepted practice in Consultant's profession.

2.4 Payment for Changes. Changes approved pursuant to an Addendum shall be compensated at the personnel hourly rates prescribed in Exhibit "A" hereto.

3. PERFORMANCE SCHEDULE

3.1 Time of Essence. Time is of the essence in the performance of this Agreement.

3.2 Schedule of Performance. All services rendered pursuant to this Agreement shall be performed within any time periods prescribed in any Schedule of Performance attached hereto. The extension of any time period specified in the Schedule of Performance must be approved in writing by the Contract Officer, and which approval shall not be unreasonably withheld.

3.3 Force Majeure. The time for performance of services to be rendered pursuant to this Agreement may be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of a public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, and unusually severe weather, if the Consultant shall within ten (10) days of the commencement of such condition notify the Contract Officer who shall thereupon ascertain the facts and the extent of any necessary delay, and extend the time for performing the services for the period of the enforced delay when and if in the Contract Officer's judgment such delay is justified, and the Contract Officer's determination shall be final and conclusive upon the parties to this Agreement.

3.4 Term. Unless earlier terminated in accordance with Section

7.5, 7.6, or 7,7 of this Agreement, the term of this Agreement shall be the shorter of:
(a) the period of time described in the Schedule of Performance as the same may be extended pursuant to section 3.2, or (b) until satisfactory completion of the services.

4. COORDINATION OF WORK

4.1 Representative of Consultant. The following principal of the Consultant is hereby designated as being the principal and representative of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith: Steven C. Slocum (“Principal”) It is expressly understood that the experience, knowledge, capability Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
and reputation of the foregoing Principal is a substantial inducement for City to enter into this Agreement. Therefore, the foregoing Principal shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. The foregoing Principal may not be changed by Consultant without the express written approval of Contract Officer.

4.2 Contract Officer. The Contract Officer shall be the Deputy Director of Public Works/City Engineer. It shall be the Consultant's responsibility to keep the Contract Officer fully informed of the progress of the performance of the services and Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer.

4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement.

Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the Contract Officer. In addition, neither this Agreement nor any interest herein may be assigned or transferred, voluntarily or by operation of law, without the prior written approval of Contract Officer.

4.4 Independent Contractor. Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees perform the services required herein, except as otherwise set forth herein. Consultant shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role.

Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. Consultant shall be solely responsible for compliance with State and Federal Law with respect to the wages, hours, benefits, and working conditions of its employees, including requirement for payroll deductions for taxes. Employees or independent contractors of Consultant are not City employees.

5. INSURANCE / INDEMNIFICATION

5.1 Insurance.

5.1.1. Consultant shall maintain in full force and effect during the term of these Agreement policies of commercial general liability and automobile liability insurance (each of which shall include property damage and bodily injury) and each with limits of at least $2,000,000 combined single limit coverage per occurrence.

5.1.2. Consultant shall maintain in full force and effect during the term of this Agreement a policy of professional liability insurance coverage with limits of at least $2,000,000 combined single limit coverage per claim or per occurrence. If Consultant provides claims made professional liability insurance, Consultant shall also agree in writing either (1) to purchase tail insurance in the Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
amount required by this Agreement or to cover claims made within five (5) years of the completion of Consultant’s service under this Agreement, or (2) to maintain professional liability insurance coverage with the same carrier in the amount required by this Agreement for at least five (5) years after completion of Consultant’s services under this Agreement with “prior acts” coverage covering all dates during the performance of the services under this Agreement. Consultant shall also provide evidence to the City of the purchase of the required tail insurance or continuation of the professional liability policy.

5.1.3. Consultant shall carry and pay for such workers’ compensation insurance as is required to fully protect Consultant and its employees under California Worker’s Compensation Insurance Law. The insurance company shall by endorsement waive all rights of subrogation against the City for losses paid under the policy. Consultant on its own behalf and on behalf of all those it may lawfully bind hereby also waives all rights of subrogation for losses or paid on behalf of others in connection with the performance of services under this Agreement.

5.1.4. Consultant shall, at no cost to the City, cause its insurer(s) to meet the following insurance requirements prior to the commencement of services.

5.1.4.1 By endorsement, name the City and its elected
and appointed officials and employees as additional insureds on the commercial general and automobile liability policies.

5.1.4.2 The insurance shall be issued by a company
authorized by the Insurance Department of the State of California and rated A, VII or better (if an admitted carrier) or A-, X (if offered, by a surplus line broker), by the latest edition of Best’s Key Rating Guide, except that the City will accept workers’ compensation insurance rated B-VIII or better or from the State Compensation Fund.

5.1.4.3 By endorsement, the insurer shall confirm that
the Insurance shall not be cancelled except after thirty (30) days prior written notice from the insurer to the City, except in the case of non-payment of premium, in which case at least ten (10) calendar days prior written notice shall be provided from the insurer to the City.

5.1.4.4 The commercial general and automobile liability insurance shall each be primary as respects the City, and any other insurance maintained by the City shall be in excess of this insurance and not contribute to it.

5.1.4.5 The insurance payable by each insurance policy
carried by the Consultant shall be the limits stated herein.

5.1.5. Upon execution of this Agreement, Consultant shall provide to City certificates of insurance and insurer endorsements evidencing the required insurance. Insurer endorsements (or a copy of the policy binder if applicable) shall be provided as evidence of meeting the requirements of Subsections 5.1.4.1, and 5.1.4.3, and 5.1.4.4 above and the waiver of subrogation requirement in Section Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1

5.1.3 above. If self-insured for worker’s compensation, Consultant shall submit to City a copy of its certification of self-insurance issued by the Department of Industrial Relations.

5.2 Indemnification. The Consultant shall defend, indemnify and hold harmless the City, its elected and appointed officers, employees, volunteers, and agents, and for any project pursued jointly with one or more other public agencies, the joint agency(ies) (collectively the “Indemnitees”) from and against any and all actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and attorneys' fees, for injury to or death of person or persons, for damage to property, including property owned by City (collectively “Claims”) arising from errors, omissions or willful acts of Consultant, its officers, employees, subcontractors, subconsultants, and agents, and arising out of or related to Consultant's performance under this Agreement, except for such loss as may be caused by City's sole active negligence or willful misconduct, or that of one or more Indemnitees.

5.2.1 The Consultant shall also defend, indemnify and hold the City harmless from any claims or liability for City health and welfare, retirement benefits, or any other benefits of part-time or fulltime City employment sought by Consultant’s officers, employees, or independent contractors, whether sought by legal action, administrative proceeding or pursuant to State statute.

5.2.2 If the Consultant is a “design professional” (as defined in California Civil Code section 2782.8) performing design professional services, then sections 5.2 and 5.2.1 above shall not apply, and Consultant shall instead indemnify and defend the Indemnitiees against all Claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant or its employees or subconsultants, if any. When this section 5.2.2 applies, Consultant’s cost to defend shall not exceed the proportionate percentage of fault of Consultant and its employees and subconsultants as determined by final judgment.

6. RECORDS AND REPORTS

6.1 Reports. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require.

6.2 Records. Consultant shall keep such books and records as shall be necessary to properly perform the services required by this Agreement and enable the Contract Officer to document and evaluate the performance of such services. The Contract Officer shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit and make records and transcripts from such records.

6.3 Ownership of Documents. Upon Consultant’s receipt of final payment, all drawings, specifications, reports, records, documents and other materials prepared by Consultant exclusively in the performance of this Agreement shall be the property of City, including all rights arising under Copyright and other Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
intellectual property laws, and shall be delivered to City upon request of the Contract Officer or upon the expiration or termination of this Agreement, provided Consultant has received final payment under this Agreement, and Consultant shall have no claim for additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Consultant may retain a copy of such documents for its own reference, but no additional copy shall be made without the written consent from City. Notwithstanding anything to the contrary in this Agreement, Consultant retains all right, title and interest in and to any of Consultant’s pre-existing and/or background Intellectual Property and/or any information that was in Consultant’s possession prior to the execution of this Agreement.

6.4 Release of Documents. All drawings, specifications, reports, records, documents and other materials prepared by Consultant exclusively in the performance of services under this Agreement shall not be released publicly without the prior written approval of the Contract Officer.

7. ENFORCEMENT OF AGREEMENT

7.1 California Law. This Agreement shall be construed and interpreted both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Orange, State of California, or any other appropriate court in the Count of Orange, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.

7.2 Waiver. No delay or omission in the exercise of any right or remedy of a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. No consent or approval of City shall be deemed to waive or render unnecessary City's consent to or approval of any subsequent act of Consultant. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

7.3 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.4 Legal Action. In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain injunctive relief, a declaratory judgment or any other remedy consistent with the purposes of this Agreement.

7.5 Termination Prior to Expiration of Term. The City reserves the right to terminate this Agreement at any time, with or without cause, upon written notice to Consultant. Upon receipt of the notice of termination, Consultant shall Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
immediately cease all services hereunder except such as may be specifically approved in writing by the Contract Officer. Consultant shall be entitled to compensation for all services rendered prior to receipt of the notice of termination and for any services authorized in writing by the Contract Officer thereafter.

7.6 [RESERVED]

7.7 Non-Appropriation of Funds. City’s financial obligations under this Agreement beyond the initial fiscal year, if any, are contingent upon the Tustin City Council’s appropriation of funds for such purpose. If the Tustin City Council does not appropriate the necessary funds for the subsequent fiscal year, this Agreement shall terminate at the end of the then-most recent fiscal year for which funds were appropriated. The City shall provide Consultant with written notice of such non-appropriation at the earliest possible opportunity, but no later than thirty (30) days prior to the commencement of the new fiscal year, or as soon as the City Council’s budget decision is finalized. In the event of termination under this section, City shall not be liable for any further payments, penalties, or damages (including loss of anticipated profits) for the periods following the date of termination.

7.8 [RESERVED]

8. CITY OFFICERS AND EMPLOYEES; NON-DISCRIMINATION

8.1 Non-Liability of City Officers and Employees. No officer or employee of City shall be personally liable to the Consultant, or any other party, in the event of any default or breach by the City or for any amount which may become due to the Consultant or its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Covenant Against Discrimination. Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination or segregation in the performance of or in connection with this Agreement regarding any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry.

Consultant shall take affirmative action to ensure that applicants and employees are treated without regard to their race, color, creed, religion, sex, marital status, national origin, or ancestry.

9. MISCELLANEOUS PROVISIONS

9.1 Notice. Any notice, demand, request, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by pre-paid, firstclass mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this Section.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
To City: To Consultant:

CITY OF TUSTIN MICHAEL BAKER INTERNATIONAL
300 Centennial Way 5 Hutton Center Drive, Suite 500
Tustin, CA 92780 Santa Ana, CA 92707
Attention: Director of Public Works Attention: Jeff McClure, Principal-inCharge

9.2 Integrated Agreement. This Agreement contains all of the agreements of the parties, supersedes all prior written and verbal discussions preceding it.

9.3 Amendment. This Agreement may be amended by mutual
written consent of the parties by an instrument in writing signed by both parties.

9.4 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement, which shall be interpreted to carry out the intent of the parties hereunder.

9.5 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below.

Dated:
"City"

CITY OF TUSTIN
By:

Aldo E. Schindler,
City Manager
APPROVED AS TO FORM:

WOODRUFF & SMART, APC.

City Attorney
/msd/
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 4917-6916-9596, v. 1
"Consultant"
By:

Dave Mercier,
Associate Vice President
By:

Richard Beck,
Assistant Secretary
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 11 EXHIBIT “A”

REQUEST FOR PROPOSAL
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

C I T Y O F T U S T I N
3 0 0 C e n t e n n i a l W a y T u s t i n , C a l i f o r n i a 9 2 7 8 0

R E Q U E S T F O R P R O P O S A L S
for
Professional Consulting Services
for the
Engineering Design Services for Jamboree Road Rehabilitation I-5 to Portola Parkway (CIP No. 70263)
April 2026
PROPOSAL SUBMITTALS: Responses to the Request for Proposal (RFP) are to be submitted to:

Tanya Baggao
Assistant Engineer
Public Works Department
City of Tustin
300 Centennial Way
Tustin, California 92780
no later than 2:00 P. M. on June 1, 2026. The proposal shall be submitted electronically via Open Gov. Proposals received in OpenGov after the specified time will not be accepted. Questions regarding this request will be limited to written form and shall be submitted via OpenGov. Verbal inquiries will not be accepted.

The fee proposal shall be uploaded as a separate file from the main proposal in OpenGov.

INDEX

SECTION PAGE
I. Introduction/Project Description 2
II. Schedule of Events 2
III. Instructions to Proposers 2
IV. Scope of Work 4
V. Proposal Requirements 14
VI. General Requirements 18
VII. Consultant Evaluation & Selection Process 20
VIII. Administration/Contract Requirements 21

ATTACHMENTS
Attachment A – Sample Consultant Services Agreement
Attachment B – Tail Insurance Letter Agreement
Attachment C – Bucknam Report
Attachment D – Location Map
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 2 ends

I. INTRODUCTION / PROJECT DESCRIPTION
The project includes pavement resurfacing on Jamboree Road between Michelle Drive and Portola Parkway in collaboration with City of Irvine. Notable improvements include localized removal and reconstruction of asphalt failure areas; cold milling and overlay of the asphalt surface course; replacement of curb ramps to be ADA compliant; adjustment of utility covers to grade; replacement of traffic signal detector loops; replacement of pavement markers and striping; and bicycle lane improvements with green pavement to enhance safety at conflict point with vehicular travel.

II. SCHEDULE OF EVENTS
April 30, 2026 Issuance of Request for Proposals
May 15, 2026 Deadline for questions in OpenGov
June 1, 2026 Proposals due in OpenGov
June 1 - June 12, 2026 Selection process
June 16, 2026 City Council Approval of Consultant Contract (est. date) June 17, 2026 Issuance of Notice to Proceed (est. date) Note: Subject to change at the discretion of the City.

III. INSTRUCTIONS TO PROPOSERS
A. CITY RESPONSIBILITIES
The City will provide information in its possession relevant to preparation of required information in this RFP. The City will provide only the staff assistance and documentation specifically referred to herein.

B. PROPOSER RESPONSIBILITIES
Point of Contact: The selected proposer will assume responsibilities for all services in its proposal. The selected proposer shall identify a sole point of contact with the greatest knowledge concerning the required service operations and contractual matters, including payment of all charges resulting from the Agreement. Contact information such as email and phone number must be included into the proposal.

Evidence of Financial Capacity: Proposer may be requested to submit its most recent audited financial statement, evidencing proposer’s financial capacity to fully perform the required services, including provision of equipment and personnel expenses over a ninety (90) day period. If said financial statement does not reflect full ninety (90) day operational capacity, proposer may include a letter of credit as evidence of supplemental capacity.

C. REQUEST FOR INFORMATION OR CLARIFICATION
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 3 ends

All questions or requested clarifications shall be made only in writing to the Q&A section located in OpenGOV by the date indicated on OpenGov. No verbal requests or responses will be accepted. Significant interpretations or clarifications will be addressed via addenda to this RFP.

D. ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted on OpenGOV. Addenda shall become part of the agreement documents.

E. LICENSES AND PERMITS
The selected proposer shall be required to obtain a City of Tustin Business license within ten (10) business days of selection and must provide a copy to the City’s project manager or designee prior to commencing any work in Tustin. Additionally, Proposer will be responsible for obtaining any licenses/permits required by the Scope of Work.

F. PRE-PROPOSAL MEETING
Should a pre-proposal meeting be scheduled, the date, time, and location is identified on the cover page of this RFP. The meeting will include discussion of the project scope and a question-and-answer session. It is highly recommended that the Proposer’s key team members attend this meeting. Significant interpretations or clarifications will be addressed via addenda to this RFP, as described above in “Section D: Addenda.” G. CITY RIGHT TO REJECT
The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any contract will be awarded pursuant to this RFP or otherwise.

The City reserves the right to accept or reject the combined or separate components of this proposal in part or in its entirety or to waive any minor inconsistency, informality or technical defect in the proposal.

The City reserves the right to reject, replace, and approve any and all subconsultants. All subconsultant(s) shall be identified in response to this RFP. Subconsultants shall be the responsibility of the successful proposer, and the City shall assume no liability of such subconsultants.

H. PROTEST PROCEDURES
Only respondents who have actually submitted a proposal may file a “protest” to an RFP with the City’s Public Works Department. In order for a Proposer’s protest to be considered valid, the protest must:

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 4 ends

1. Be filed in writing before 5:00 p.m. of the 5th business day following the posting of RFP Results/Notice of Intent to Award on the City’s online bidding system;

2. Clearly identify the specific irregularity or accusation;

3. Clearly identify the specific City staff determination or recommendation being protested;

4. Specify, in detail, the grounds of the protest and the facts supporting the protest; and

5. Include all relevant, supporting documentation with the protest at time of filing.

If the protest does not comply with each of these requirements, it will be rejected as invalid. If the protest is valid, the City’s City Engineer or designated City staff member, shall review the basis of the protest and all relevant information. The decision from the City Engineer or his/her designee, is final and no further appeals will be considered.

IV. SCOPE OF WORK
A. PROJECT DESCRIPTION
The City of Tustin is seeking professional engineering consulting services for the preparation of Plans, Specifications, and Engineer’s Estimate (PS&E) for the Jamboree Road (Michelle Drive to Portola Parkway) rehabilitation and improvement project. The Consultant shall prepare a streamlined, bid-ready PS&E package appropriate for a 2- mile arterial rehabilitation project, avoiding unnecessary sheet proliferation while maintaining full compliance with City standards and federal funding requirements.

Improvements may include, but are not limited to:
• Pavement rehabilitation or reconstruction
• ADA curb ramp upgrades
• Bicycle lane extension and treatment improvements
• Utility adjustments
• Replacement of traffic loop detectors, pavement markers, and striping The City will retain responsibility for:
• NEPA clearance
• Federal authorization (E-76)
• ROW certification coordination with Caltrans
• Traffic Control Plans (TCP) to be prepared by contractor The Consultant shall provide all supporting design documents necessary for the City to complete these processes.

B. PROJECT MANAGEMENT AND COORDINATION
The Consultant shall be fully responsible for the overall management and coordination for the project, which may include, but is not limited to project development team meetings, liaison with affected agencies, and utility companies. Prepare progress report Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 5 ends

and schedule, securing permits for all field studies and any other required permits from other agencies.

Services shall include but are not limited to:
• Project kickoff meeting with City staff
• Preparation of project schedule
• Monthly coordination meetings
• Coordination with City departments and outside agencies • Progress reporting and budget monitoring
Deliverables:
• Project schedule
• Monthly progress reports
• Meeting agendas and summaries
C. RECORDS RESEARCH AND EXISTING CONDITIONS
Research all information pertinent to the project including, but not limited to existing field condition, as-built plans and record drawings, right-of-way data and all future improvement plans adjacent to or affecting the project site. The selected Consultant shall identify all existing and proposed facilities within the project limits and potential conflicts.

Research shall include:
• Existing roadway plans and as-built drawings
• Traffic signal plans if any intersection impacted by the project • Storm drain maps
• Utility records
• Right-of-way maps
• Pavement management data
• Previous studies affecting the corridor
The Consultant shall identify potential constraints affecting the design.

Deliverables:
• Existing conditions memorandum
D. WATER QUALITY AND LID
The Consultant shall prepare a Water Quality Management Plan (WQMP) in accordance with Orange County MS4 requirements.

The Consultant shall:
• Evaluate Low Impact Development (LID) strategies
• Perform infiltration feasibility analysis
• Coordinate with the City regarding BMP selection
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 6 ends

• Design water quality BMPs where appropriate
Deliverables:
• Preliminary WQMP
• Final WQMP
• Water quality calculations
• BMP construction details
E. TRAFFIC ENGINEERING
Tasks shall include:
• Signing and striping design
• Bicycle facility design
• Pedestrian crossing improvements
Deliverables:
• Traffic design plans
F. ADA COMPLIANCE
The Consultant shall review and evaluate Attachment C – Bucknam Report and incorporate appropriate mitigation measures for all identified areas requiring rehabilitation into the project design.

G. PRELIMINARY ENGINEERING (30% DESIGN)
The Consultant shall perform preliminary engineering and develop 30% design documents that establish the overall project approach, limits, and key design elements.

This phase is intended to define the scope, identify constraints, and provide a basis for stakeholder review and cost validation. Coordination with the City of Irvine is needed for any improvements at the jurisdictional borders.

Tasks shall include, but are not limited to:
• Establishing horizontal and vertical project limits for pavement rehabilitation, including identification of treatment strategies (e.g., grind and overlay, full-depth reclamation, reconstruction).
• Developing preliminary typical sections for all roadway classifications within the project limits, including travel lanes, bike facilities, parking, medians, and sidewalks.
• Evaluating existing pavement conditions and incorporating available pavement management data into design recommendations.
• Identifying locations requiring ADA improvements in compliance with Americans with Disabilities Act, including curb ramps, detectable warning surfaces, and pedestrian access routes.
• Preparing conceptual layouts for curb ramp upgrades, including preliminary grading and drainage considerations.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 7 ends

• Incorporating bicycle facility improvements consistent with applicable local and state guidelines, including lane reconfigurations or striping enhancements where feasible (including bike lane extension and green paint treatment). • Developing preliminary signing and striping concepts in accordance with California Manual on Uniform Traffic Control Devices.
• Identifying utility conflicts, drainage issues, and right-of-way constraints based on available information.
• Coordinating with the City to confirm design criteria, standards, and assumptions. • Consultant shall identify potential utility conflicts with level of confidence sufficient to inform design decisions, not conceptual identification only. • Provide a brief Basis of Design memorandum summarizing key engineering decisions, assumptions, and rationale.

Plans shall include the following but not limited to:

1. Title Sheet
o Project limits
o CIP
o Funding (placeholder for federal)
o Location map (no separate sheet)
o Jurisdiction limits (Tustin/Irvine)

2. General Notes + Abbreviations + Legend
o Construction notes
o Applicable standards (Greenbook, CA MUTCD, City)
o Abbreviations & symbols
o Measurement/payment notes (if needed) Quantity / Summary Tables

3. Typical Sections
o Standard arterial section
o Any variation (bike lane, median, transitions)
o Keep to 1–2 sheets max

4. Layout (Plan Sheets)
o Up to 10 sheets
o Limits of work
o Pavement rehab limits (grind/overlay vs reconstruction) o Spot repairs
o Utility adjustments (lumped)
o Curb ramp locations
o Striping removal

5. ADA / Pedestrian Details & construction details
Details shall Include:
o Curb ramp layouts (dimensioned if needed)
o Detectable warning details
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 8 ends

o Standard details reference
o Pavement sections
o Utility adjustment details
o Minor concrete details
o Tie-ins

6. Signing & Striping
o Full striping layout
o Sign locations + schedule
o Legends & notes
o Bike lane treatments (green zones)

7. Landscape & Irrigation (IF APPLICABLE)
Only if impacted:
o Restoration areas
o Irrigation adjustments
o Controller/line impacts (if any)
Note that striping plan of Jamboree segment between Keller Drive and Driveway (next to Burger King) will be designed by a separate CIP project. The City will provide final design plan of this segment to the selected consultant.

Deliverables:
• 30% design plans (PDF format), including:
o Title sheet and project layout
o Preliminary plan sheets showing limits of work
o Typical sections
o Demolition and Disposition Plans
o Concept striping layout
o Bike lane strategy (including green treatment locations) o Detail Sheets
• Preliminary engineer’s opinion of probable construction cost (with assumptions and contingencies clearly identified)
• Preparing draft project specifications tailored to the project (conforming to 2024 Green Book Standards).

H. INTERMEDIATE ENGINEERING (60% DESIGN)
The Consultant shall refine the design and prepare 60% plans incorporating City review comments and advancing all design elements to a level suitable for detailed review and inter-agency coordination.

Tasks shall include, but are not limited to:
• Incorporating and responding to all City comments from the 30% submittal.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 9 ends

• Advancing geometric design, including lane configurations, transitions, and tieins. • Developing detailed curb ramp layouts with grading, spot elevations, and ADAcompliant slopes and landings (if applicable). • Refining pavement structural sections based on geotechnical recommendations (if available).
• Advancing signing and striping plans, including striping layouts, legends, and sign schedules.
• All known utility conflicts shall be resolved in the design or clearly accounted for in the plans and specifications.
• Coordinating with utility providers to address potential conflicts. • Developing preliminary traffic control concepts for construction staging. The Consultant shall NOT prepare Traffic Control Plans; however, the Consultant shall:
o Define construction constraints (lane closure limitations, hours, sequencing assumptions)
o Identify critical staging considerations impacting design o Provide sufficient notes/specifications for contractor-prepared TCP • Advancing drainage considerations, including identification of necessary improvements or adjustments.
• Performing internal quality control review prior to submittal.

Deliverables:
• 60% design plans (PDF format), including:
o Updated plan sheets with refined design details
o ADA curb ramp detail sheets (if applicable)
o Developed striping plans with lane configurations
o Preliminary sign locations
• Updated engineer’s opinion of probable construction cost • Comment response matrix addressing 30% review comments • Advancing draft project specifications based on comments provided and/or towards final version (conforming to 2024 Green Book Standards). Consultant shall define design intent and constraints but shall not dictate contractor means and methods unless necessary for public safety or project performance. • Bid items shall be clearly measurable and constructable, consistent with plan callouts and specifications, and free of overlap or double payment potential.

I. FINAL PLANS, SPECIFICATIONS AND ESTIMATE (PS&E)
The Consultant shall prepare complete, bid-ready Plans, Specifications, and Estimate (PS&E) documents suitable for advertisement and construction. 90% Submittal
The 90% submittal shall represent a near-final set of documents suitable for comprehensive City review. No new design elements, scope changes, or major revisions shall be introduced at the 90% submittal unless specifically requested by the City.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 10 ends

Tasks shall include:
• Incorporating all previous comments and finalizing design elements. • Completing all plan details, notes, and callouts.
• Finalizing quantity calculations and construction bid item breakdowns. • Conducting a formal internal QA/QC review and documenting the process.
• Finalizing project specifications (conforming to 2024 Green Book Standards).

Deliverables:
• 90% plans (PDF format)
• Finalized project specifications (conforming to 2024 Green Book Standards) with bid definition clearly defined
• Engineer’s opinion of probable construction cost (including breakdown of all lump sum bid items)
• Detailed quantity calculations (in spreadsheet format) • QA/QC documentation and checklist
• Fully dimensioned striping plans
• Complete sign schedule
• All markings tied to stationing or limits
100% Submittal (Final PS&E)
The Consultant shall incorporate all final City comments and deliver signed, sealed, and complete PS&E documents.

Tasks shall include:
• Addressing all 90% review comments to the City’s satisfaction. • Finalizing all contract documents for bidding and construction. • Ensuring consistency between plans, specifications, and estimate.

Deliverables:
• Signed and sealed final plans (PDF and native format) • Final project specifications (conforming to 2024 Green Book Standards). • Final engineer’s opinion of probable construction cost • Final quantity calculations
• Final bid schedule
• Final, bid-ready signing and striping plans
A complete PS&E package shall be considered acceptable when:
• No major scope gaps identified during bid phase
• Less than 10 RFIs related to design ambiguity
• No conflicting bid items vs plans/specs
• Quantities independently reproducible within ±5%
• Constructability issues minimized (no major redesign during construction) Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 11 ends

Applicable Standards and Requirements
All work shall conform to the latest editions of the following, as applicable:
• City of Tustin design standards, specifications, and standard plans • Standard Specifications for Public Works Construction • California Manual on Uniform Traffic Control Devices
• Americans with Disabilities Act and current accessibility guidelines J. CONSTRUCTABILITY REVIEW
The Consultant shall conduct a formal constructability review required at 60% and refined at 90%.

The review shall evaluate:
• Construction staging
• Traffic control impacts
• Utility conflicts
• Construction sequencing
• Contractor access
Deliverables:
• Constructability Review Memorandum
K. DESIGN QUALITY ASSURANCE / QUALITY CONTROL
The Consultant shall implement a Design Quality Management Plan (DQMP).

Internal reviews shall include:
• Independent design check
• Quantity verification
• Utility coordination verification
• ADA compliance verification
• Constructability review
At the 60% and 90% milestones, the Consultant shall submit a QA/QC Certification Package including:

1. QA/QC checklist

2. Independent design check certification

3. Constructability review memorandum

4. Quantity verification documentation

5. Utility conflict verification
L. BID SUPPORT
Consultant shall assist during bid advertisement.

Tasks include:

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 12 ends

• Responding to contractor RFIs
• Preparing addenda if necessary
• Attending pre-bid meeting if requested
M. CONSTRUCTION SUPPORT
Consultant shall provide limited support during construction.

Tasks include:
• Attend preconstruction meeting
• Respond to RFIs
• Review shop drawings
• Assist with design clarifications
N. RECORD DRAWINGS
Upon completion of construction, the Consultant shall prepare record drawings based on field-marked plans.

Deliverables:
• As-built drawings in AutoCAD
• Final PDF plan set
O. DESIGN RESPONSIBILITY
The Consultant shall be responsible for the accuracy and completeness of all plans, specifications, estimates, and supporting documents prepared under this Agreement.

Consultant shall deliver a clean, advertisement-ready package:
• Plans (PDF + CAD)
• Specifications (Word + PDF)
• Bid schedule (Excel)
• Engineer’s estimate
• Quantity backup
Plans shall include:
• Title Sheet
• General Notes / Abbreviations / Legend / Quantity / Summary Tables • Typical Sections
• Utility Adjustment Summary + disposition info
• Layout (Plan Sheets)
• ADA / Pedestrian Details / Construction Details
• Signing & Striping
• Landscape & Irrigation (if needed)
• Specs
• WQMP / Water Quality (if applicable)
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 13 ends

The Consultant shall correct, at no additional cost to the City, any errors, omissions, or deficiencies in the design documents identified during the design, bidding, or construction phases.

Corrections shall be completed promptly to avoid delays to the project.

DESIGN PS&E SCHEDULE
Task Responsibility Target Notes
NPT City Jun 2026
30% Design Consultant Nov 2026 Substantial PS&E
60% PS&E
(ROW Check-In #1) City/Consultant/Caltrans ROW Feb 2027 ROW Certification with Caltrans 90% PS&E
(ROW Check-In #2) City/Consultant/Caltrans ROW Apr 2027 Substantially Complete PS&E Final PS&E City Aug-Sep 2027 Final PS&E
P. CLIENT PROVIDED DOCUMENTS AND INFORMATION
• Survey Data
o AutoCAD Civil 3D survey files with 3D points, breaklines, and a digital terrain model
o Control and benchmark documentation
o Field point files (ASCII/CSV)
o PDF exhibit suitable for design and review
• Utility Coordination
o The City will be responsible for providing coordination with all affected utilities.
• The City will provide a template for Sections A-D of the specifications. • The City of Irvine is preparing design plans for the intersection of Jamboree Road Irvine Boulevard. The finalized plans will be provided to the selected consultant for reference.
• The City will be responsible for ROW Certification and coordination with Caltrans. • The Consultant shall support the City’s ROW Certification process by providing accurate and complete design information at the 60% milestone to allow the City to initiate ROW certification. At a minimum, the Consultant shall ensure the following at 60%:
o All improvements are clearly shown within existing right-of-way limits o No permanent or temporary right-of-way impacts are introduced without prior City approval
o Utility conflicts are identified and reflected in the plans Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 14 ends

o ADA improvements are fully depicted within existing right-of-way o Design limits and tie-ins are clearly defined
o The 60% submittal shall be considered incomplete if the information necessary for the City to initiate ROW certification is not adequately provided.
o The project is anticipated to be constructed entirely within existing right-ofway. Any proposed deviation from this assumption must be identified by the Consultant at the 30% design stage.

V. PROPOSAL REQUIREMENTS
Although the City requires no specific format, this section is intended to provide guidelines to the consultant regarding features that the City will look for and expect to be included in the proposal.

A. CONTENT & FORMAT
The City requests that proposals submitted be organized and presented in a neat and logical format and are relevant to these services. Consultant’s proposals shall be clear, accurate, and comprehensive. Excessive or irrelevant material will not be favorably received.

The Proposal shall be limited to a maximum of 20 pages (excluding front and back covers, section dividers and attachments such as resumes, forms). Font size shall be minimum 11-point Arial. Proposal exhibits shall be maximum 11” x 17”. The purpose of these restrictions is to minimize the costs of proposal preparation and to ensure that the response to the RFP is fully relevant to the project.

The proposal should include the following:
• Page numbering,
• Approach and understanding of the work to be performed, • Team Organization including an organization diagram and time commitment of key staff,
• Statement of Qualifications including descriptions of similar projects by key staff to be assigned during the term of the contract,
• Brief resumes of key staff,
• Schedule of Hourly Rates and fees uploaded as a separate file from the main proposal in OpenGov,
• Three references of agencies previously contracted with, providing the same or similar services.

B. APPROACH
A description of the firm’s approach and work program to meet the City’s objectives shall be included. It should explain the technical approach, methodology, and Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 15 ends

specific tasks and activities that will be performed to address the specific issues and work items.

Information shall include:
• Progress Reporting: Consultant will supervise, coordinate, monitor and review the project for conformance with standards, policies, and procedures. Monthly progress reports will also be provided to document the progress of the project.

Progress reports must align with invoices. The City may reject invoices not supported by an acceptable progress report. Failure to provide an acceptable progress report may result in delayed or withheld payment.

Progress report should include:
o Work completed by task
o Percentage complete by task vs. budget
o Updated schedule with critical path
o Budget status (hours used vs. planned)
o Upcoming work (next 30 days)
o Issues / risks impacting scope, schedule, or budget
• Project Controls: Consultant shall prepare a detailed project schedule (MS Project or equivalent) within 2 weeks of Notice to Proceed. The schedule shall identify all tasks, milestones, and critical path and shall be updated monthly throughout the project duration. Describe the firm’s ability to control costs and provide accurate and timely invoices through internal control measures; to monitor and stay within budget; to monitor schedule and review times and describe the techniques used to complete projects within the proposed time frames.
• Proposal Certifications
a. Non-Collusion Affidavit
b. Non-Lobbying Certification
c. Non-Discrimination Certification
d. Debarment and Suspension Certification (for federally funded projects) • Quality Assurance/Quality Control (QA/QC): Describe the firm’s QA/QC processes that will be adhered to during the term of the agreement.

Consultant must implement and maintain QA/QC procedures to ensure project’s products accuracy, and to ensure that the City's quality goals are met. Consultant shall perform a formal constructability review at the 90% design stage and provide written certification that plans are coordinated and buildable.
• Subconsultant Control: All subconsultants shall be identified in proposal. City written approval will be required for any changes
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 16 ends

• Implementation Phase: A project kickoff meeting will be conducted within 2-3 weeks of Notice to Proceed to confirm the Scope of Services and design parameters. Status meetings will be conducted throughout the duration of the project to track the overall project and facilitate the flow of information between the City and consultant.
• Deliverables Matrix: the proposal shall include a deliverables matrix that identifies:
o All anticipated deliverables by task
o Submittal milestones: 30%, 60%, 90% and 100%.
o Format (PDF, CAD, Word, etc.)
o Responsible team member
C. TEAM ORGANIZATION
The purpose of this section is to describe the organization of the project team including subconsultants and key staff. A project manager and an alternate project manager who will be the prime contact and be responsible for coordinating all activities with the City should be included. An organization diagram shall be submitted showing all key team members and illustrating the relationship between the City, the project manager, key staff, and subconsultants. There also should be a brief description of the role and responsibilities of all key staff and subconsultants identified in the team organization also should be included.

D. STATEMENT OF QUALIFICATIONS
The information provided in this section should describe the qualifications of the firm and key staff in performing projects within the past five years that are similar in scope and size to demonstrate competence to perform these services. The projects listed should be those that the key staff named for this project were responsible for performing. Information shall include:
• Names of key staff that participated on named projects and their specific responsibilities.
• The client’s name, contact person, addresses, and telephone numbers. • A brief description of type and extent of services provided. • Completion dates (estimated, if not yet completed).
• Total costs of the projects.

There should be included in the section brief resumes of key personnel who will provide these services demonstrating their qualifications and experience. Resumes should highlight education, relevant experience, licenses, and specific responsibilities for services described.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 17 ends

E. FEDERAL FUNDING REQUIREMENTS
Failure to comply to the following guidelines may result in termination and/or ineligibility for federal reimbursement. Consultant shall prepare PS&E in a manner consistent with Caltrans Local Assistance expectations for federally funded projects, including documentation necessary to support ROW certification, FHWA authorization, and audit compliance.

1. Federal Aid Contract Provisions:

Proposers are advised that this project is federally funded and they shall comply with all federal requirements in the Agreement, including but not limited to 2 CFR Part 200 (Uniform Guidance), NEPA support documentation, Audit cooperation (Caltrans, FHWA, etc.).

2. Caltrans Attachments:

Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms: https://dot.ca.gov/-/media/dotmedia/programs/local-assistance/documents/lapm/ch10.pdf F. FEE PROPOSAL
Compensation for services provided shall be based upon the consultant’s detailed fee proposal to furnish the services detailed in their proposal.

A Fee Proposal shall be submitted in a separate file from the main proposal in OpenGov.

A work program together with a breakdown of labor hours by employee billing classification together with the cost of non-labor and subconsultant services shall be included with the fee proposal. The labor breakdown shall be compiled based upon a listing of work tasks that correlates with the consultant’s defined scope of work for the project proposal. This information will be used by the City staff to evaluate the reasonableness of the fee proposal and may be used in negotiating the final fee amounts for the contract agreement.

Fees will not be used to determine the ranking of the consultants.

The City will negotiate the final fee with the top ranked consultant.

Reimbursable expenses shall not be allowed unless negotiated prior to a contract.

Price escalations during the contract term are disfavored and will not be allowed unless negotiated prior to execution of contract.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 18 ends

Although no public meetings are anticipated, the fee proposal shall include a unit cost for a public meeting (eg, $/public meeting) in the event a meeting will be required.

The consultant shall prepare progress billings, reflective of the project schedule and the scope of work completed, by line item and description.

G. ASSUMPTIONS AND EXCEPTIONS
The proposal shall clearly identify any assumptions, exclusions, or exceptions to the Scope of Work, schedule, or requirements of this RFP. If no assumptions or exceptions are taken, the proposal shall include a statement to that effect. The City reserves the right to accept, reject, or negotiate any proposed assumptions or exceptions.

Undisclosed assumptions may not be considered during contract negotiation.

Assumptions or exceptions that materially affect scope, schedule, or cost may result in reduced evaluation scoring.

H. STATEMENT OF OFFER & SIGNATURE
The Proposal shall contain a statement that the proposals are a firm offer for a 90-day period and signed by an individual authorized to act on behalf of the firm.

VI. GENERAL REQUIREMENTS
A. INSURANCE REQUIREMENTS
The consultant shall furnish proof of the required insurance coverage prior to execution of the agreement. Any exceptions, deviations, or inability to meet the insurance requirements must be clearly identified in the proposal. These minimum levels of coverage are required to be maintained for the duration of the project:

1. General Liability and Automobile Liability Coverage - $2,000,000 per occurrence for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Professional Liability Coverage - $2,000,000 per occurrence (note: A “claims made” policy is acceptable). If consultant provides “claims made” coverage, consultant shall also agree in writing to either:
a. Purchase Tail Insurance in the amount required by the resulting agreement to cover claims made within five years of completion of consultant’s services under the agreement.
b. Maintain professional liability insurance coverage with the same carrier, or with an equivalent carrier in the amount required by the resulting Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 19 ends

agreement five years after completion of consultant’s services under this agreement.

The consultant shall provide written evidence of either form by executing the attached letter agreement (Attachment B) on consultant letterhead.

3. Worker’s Compensation Coverage - State statutory limits.

Deductibles, Self-Insurance Retentions, or Similar Forms of Coverage Limitations or Modifications, must be declared to and approved by the City of Tustin.

The consultant is encouraged to contact its insurance carriers during the proposal stage to ensure that the insurance requirements can be met if selected for negotiation of a contract agreement.

The City shall be named as Additional Insured and no policy may be modified or cancelled prior to thirty (30) days written notice.

Certificates of insurance and insurer endorsements evidencing the required insurance shall be provided.

B. STANDARD FORM OF AGREEMENT
The consultant will enter into an agreement with the City based upon the contents of the RFP and the consultant’s proposal. The City’s standard form of agreement is included as Attachment A. The consultant shall carefully review the agreement, and include with the proposal a description of any exceptions requested to the standard contract. If there are no exceptions, a statement to that effect shall be included in the proposal.

C. DISCLAIMER
This RFP does not commit the City to award a contract, or to pay any costs incurred in the preparation of the proposal. The City reserves the right to extend the due date for the proposal, to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified consultant, or to cancel this RFP in part or in its entirety. The City may require the selected consultant to participate in negotiations and to submit such technical, fee, or other revisions of their proposals as may result from negotiations.

D. ASSIGNED REPRESENTATIVES
The City will assign a responsible representative to administer the contract, and to assist the consultant in obtaining information. The consultant also shall assign a responsible representative (project manager) and an alternate, who shall be identified in the proposal. The consultant’s representative will remain in responsible Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 20 ends

charge of the consultant’s duties from the notice-to-proceed through project completion. If the consultant’s primary representative should be unable to continue with the project, then the alternative representative identified in the proposal shall become the project manager. The City’s representative shall first approve any substitution of representatives or subconsultants identified in the proposal in writing.

The City reserves the right to review and approve/disapprove all key staff and subconsultant substitution or removal and may consider such changes not approved to be a breach of contract.

E. CITY BUSINESS LICENSE
A city business license will be required of the consultant and any subconsultants for services under this agreement.

VII. CONSULTANT EVALUATION & SELECTION PROCESS
The City’s consultant evaluation and selection process is based upon Qualifications Based Selection (QBS) for professional services.

The following criteria will be used in evaluating the proposals using a point value system (100 points) based upon the weighting indicated below:
a. Qualification and Experience of Firm (15 points)
b. Approach and Work Plan (including project controls and QA/QC processes) (35 points)
c. Qualifications and Experience of the project manager and other key individuals (35 points)
d. Schedule of Delivery (5 points)
e. Reference Checks (10 points)
The City may elect to interview a short list of qualified firms or to interview only the top-rated firm based upon the proposals submitted for the project.

The City staff will negotiate a contract with the best qualified firm for the desired consulting services. Should the City staff be unable to negotiate a satisfactory contract with the firm considered to be the most qualified, negotiations with that firm shall be formally terminated.

Negotiations will then be undertaken with the next most qualified firm. Failing accord with the second most qualified firm, the City staff will terminate negotiations and continue the negotiation process with the next most qualified firms in order of their evaluation ranking until an agreement is reached and a firm is selected and an agreement is executed.

Additional information related to the consultant selection process will be made available in the future once the City has executed this contract. Please refrain from making any verbal inquires or requests for a formal debriefing related to the subject RFP until the City of Tustin completes the ongoing contract process.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

CITY OF TUSTIN
Engineering Design Services Jamboree Road Rehabilitation (CIP No. 70263)–RFP(2026)

Page 21 ends

VIII. ADMINISTRATIVE / CONTRACT REQUIREMENTS
A. THE CITY OF TUSTIN’S RIGHTS TO PROPOSALS
All proposals, upon submission to the City of Tustin shall become its property for use as deemed appropriate. By submitting a proposal, the offer covenants not to make any claim for or have any right to damages because of any misinterpretation or misunderstanding of the specification, or because of any misinformation or lack of information.

The City of Tustin has the following prerogatives with regard to proposals submitted:
• to accept or reject any or all proposals;
• to correct any arithmetic errors in any or all proposals submitted; • to utilize any or all the ideas from proposals submitted; • to change the proposal’s due date upon appropriate notification; • to adopt any or all of an offeror’s proposal; and
• to negotiate modifications to the scope and fee with selected offeror prior to contract award.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 12 EXHIBIT “B”
CONSULTANT’S PROPOSAL
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC JUNE 1, 2026

SUBMITTED TO
R E Q U E S T F O R P R O P O S A L ( R F P ) R E S P O N S E :

PROFESSIONAL CONSULTING SERVICES

ENGINEERING DESIGN SERVICES FOR

JAMBOREE ROAD REHABILITATION
I-5 TO PORTOLA PARKWAY (CIP NO. 70263)

SUBMITTED BY
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC Ms. Tanya Baggao, Assistant Engineer
City of Tustin
300 Centennial Way
Tustin, California 92780
RE: ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD
REHABILITATION I-5 TO PORTOLA PARKWAY
(CIP NO. 70263)
Dear Ms. Baggao and Members of the Selection Committee:

The City of Tustin (City) is seeking to resurface Jamboree Road between Michelle Drive and Portola Parkway. Improvements will include localized removal and reconstruction of asphalt failure areas; cold milling and overlay of the asphalt surface course; replacement of curb ramps to be ADA compliant; adjustment of utility covers to grade; replacement of traffic signal detector loops; replacement of pavement markers and striping; and bicycle lane improvements with green pavement to enhance safety at conflict points with vehicular travel. Michael Baker International (Michael Baker) is looking forward to assisting the City on this project.

Michael Baker has worked with and for the City on close to 100 projects over the past two decades. Additionally, we are road rehabilitation experts and have worked on many roadway improvement projects, including the Edinger Avenue Widening and Pavement Rehabilitation and Red Hill Avenue to Jamboree Road - Phase II. We have performed more than 75 resurfacing/rehabilitation projects throughout Southern California, including design and construction management.

Our team has successfully managed projects ranging from localized pavement rehabilitation and slurry seal programs to fulldepth reclamation and corridor reconstruction, utilizing data-driven pavement management strategies to maximize service life and cost efficiency. We are well-versed in Caltrans and local agency standards, sustainable design practices, and grant-funded program requirements, and we prioritize proactive stakeholder engagement to minimize community disruption during construction. By integrating engineering expertise, innovative rehabilitation techniques, and responsive project management, Michael Baker consistently delivers durable, safe, and context-sensitive roadway improvements that align with the City of Tustin’s infrastructure goals and long-term asset management objectives.

This proposal is valid for 90 days from the date of submittal. We look forward to partnering with the City to achieve its goals for this project. Should you have any questions or require additional information, please contact Project Manager Eric Spangler, PE, TE.

We acknowledge receipt of Addendum 1, dated May 21, 2026 and Addendum 2, dated May 28, 2026.

Best Regards,
Eric Spangler, PE, TE Richard Beck, CEP, PWS, CERP
Project Manager Vice President (authorized to bind)
[email protected] [email protected]
949-855-3657 949-855-3687
David Hoopfer, PE
Deputy Project Manager
[email protected]
949-330-4125

LONG-STANDING

RELATIONSHIP WITH THE CITY
Michael Baker has been working
with the City since 1998. We have
performed almost 100 projects
during that time, including pavement
rehabilitation, stormwater, streetscape
design, land development, construction
services, roadway design, landscape
improvements, channel improvements,
bridge engineering, and many others.

We know the City and you are familiar
with Michael Baker — eliminating that
awkward and potentially expensive
“getting to know you” phase.

CURRENTLY PERFORMING THE

SURVEY FOR THE JAMBOREE

ROAD REHABILITATION

PROJECT
Our team has been out in the field
surveying the Jamboree Road
Rehabilitation site area for this project.

We worked with the City to determine
the project’s needs when developing the
survey scope, and our Deputy Project
Manager has walked the site to get a
feel for the City’s needs. Our company
(previously RBF Consulting) also
worked on a previous Jamboree Road
Rehabilitation Project within a portion
of this site between Irvine Boulevard
and Portola Parkway. We are familiar
with every square foot of the anticipated
project area.

EXTENSIVE ROAD

REHABILITATION EXPERIENCE
Michael Baker brings extensive
experience delivering comprehensive
roadway rehabilitation services for
municipal clients throughout California,
including pavement assessment,
complete streets design, Americans
with Disabilities Act (ADA)-compliant
improvements, utility coordination,
drainage enhancements, traffic
management, and construction support.

COVER LETTER
1 3
2 MICHAEL BAKER BRINGS

THE FOLLOWING
ATTRIBUTES TO THE CITY:

June 1, 2026
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 2 CITY OF TUSTIN | CIP NO. 70263

1. PROJECT APPROACH AND UNDERSTANDING
Project Understanding
Michael Baker understands that the City of Tustin is
seeking a qualified team to develop a plan to rehabilitate the pavement for a 2.4-mile stretch of Jamboree Road
between Michelle Drive and Portola Parkway. Notable
improvements include:
▬ Localized removal and reconstruction of asphalt
failure areas
▬ Cold milling and overlay of the asphalt surface course ▬ Replacement of curb ramps to be ADA compliant
▬ Adjustments of utility covers to grade
▬ Replacement of Traffic Signal Detector loops
▬ Replacement of pavement markers and striping
▬ Bicycle lane improvements with green pavement to
enhance safety at conflict point with vehicular travel
In preparation for this project, we have reviewed the
information and the existing data provided by the City in the Request for Proposal (RFP). Deputy Project Manager, David Hoopfer, PE, walked the length of Jamboree Road
between Michelle Drive and Portola Parkway to observe
and photo document some of the existing conditions,
guiding our approach. Based on his observations, the
existing pavement shows signs of distress that include
alligator cracking, longitudinal and transverse cracking, and raveling and weathering of the asphalt surface.

Photos from our site walk are below and at top right:

Figure 1. Jamboree Road and Tustin Ranch Plaza
intersection.

Figure 2. Jamboree Road and Irvine Boulevard
Intersection.

Critical Issues
One of the key components of this project is to extend
the bike lane in the southbound direction to El Camino
Real. This is challenging due to right-of-way restrictions.

The land on the west and east sides of Jamboree Road
is private property owned by a private developer. In
order to add a bike lane in the southbound direction at the Jamboree Road/El Camino Real intersection, the
southbound travel lanes will need to shift to the east and the median will need to be reduced as shown in Exhibit 1.

This solution presents the following challenges:

The southbound lanes on the north and south
sides of the intersection will need to shift to the
east to create room for a bike lane. The medians
on the north and south sides of the intersection will
need to be modified to accommodate the lane shifts.

Existing trees may need to be removed from
the existing median and new landscaping and
irrigation may be required. A monument sign within
the median will need to be relocated.

The lane shift on the south side of the intersection
will extend into Caltrans right-of-way. The lane
shift and median modifications will need to be
reviewed and approved by Caltrans.

The lane shift will require traffic signal
modifications.

The northbound lanes will need to shift due to the
median modifications.
1 2
3 4
5 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 3 CITY OF TUSTIN | CIP NO. 70263
Exhibit 1. Critical Issues Map

CALTRANS RIGHT OF WAY LIMITS

CALTRANS RIGHT OF WAY LIMITS

RELOCATE MEDIAN

PROPOSED BIKE LANE

NARROW MEDIAN

JAMBOREE ROAD

EL CAMINO REAL

WEST DRIVE
The southbound lanes on the north and south sides of the intersection will need to shift to the east to create room for a bike lane. The medians on the north and south sides of the intersection will need to be modified to accommodate the lane shifts.

Existing trees may need to be removed from the existing median and new landscaping and irrigation may need to be installed. A monument sign will need to be relocated.

The lane shift on the south side of the intersection will extend into Caltrans right-of-way. The lane shift and median modifications will need to be reviewed and approved by Caltrans.

The lane shift will require traffic signal modifications.

The northbound lanes on the south side of the intersection will need to shift due to the median modifications. 1 2
3 4
5 1
5 2
3 1 4
5 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 4 CITY OF TUSTIN | CIP NO. 70263
Project Approach
Pavement Investigation
Our approach will utilize a combination of investigative activities including: record research (review of prior
pavement and geotechnical investigation), visual
observation (walking the project site to map limits of
distressed pavements), and field investigation (inplace deflection Falling Weight Deflectometer (FWD) testing, ground penetrating radar thickness scanning,
and pavement coring at failed pavement locations). Our
team will utilize Non-Destructive FWD Deflection Testing, Ground Penetrating Radar (GPR), and pavement coring
at 33 specific locations to facilitate our understanding of the existing pavement condition. In addition, if the City considers that further pavement investigation is
warranted, the team will provide testing to supplement
the coring data.

A digital map of the project pavement areas will be
generated utilizing the GPR data to illustrate the true limits of damaged structural pavement. Based on the
information obtained from our investigation activities, the Michael Baker team will perform laboratory testing
and perform TI calculations to establish proposed
structural pavement section(s). The team will prepare
an engineering cost analysis for up to three alternative pavement systems for projected service lives of 10-years and 20-years, respectively. The pavement systems
will incorporate alternative surface treatments to
address long-term maintenance and durability over the
anticipated life of the pavement.

Figure 3. Alligator cracking
Progress Reporting
Michael Baker will send the City a monthly progress
report along with the monthly invoice that includes the following information:
▬ Work completed by Task number
▬ Percent complete vs. Budgeted amount
▬ Updated schedule with critical path(s) shown
▬ Budget status (hours used vs. planned)
▬ Upcoming 30-day work plan
▬ Issues and risk log for items impacting the scope,
schedule, and/or budget
Project Controls
Our team recognizes that a comprehensive, realistic
project schedule is necessary. Eric Spangler, PE, TE,
will be responsible for developing the schedule and then monitoring it on a weekly basis. This schedule will include all tasks, milestones, reviews, project deliverables, and critical path, and will be updated monthly throughout
the duration of the project. It will also identify tasks that are critical to maintaining the project schedule. If tasks fall behind schedule, Eric will make staffing adjustments as necessary. Michael Baker will comply with the
Caltrans Local Assistance Procedures Manual (LAPM)
requirements to ensure smooth reimbursement of any
grant funding.

Our team understands that successfully managing costs
on a project starts well before the project even begins.

The following are key areas we will focus on:

Scope and Fee Preparation: Our scoping documents
are carefully prepared and our design budgets are
reviewed by multiple staff prior to finalizing the costs. This will allow for budgets that represent the appropriate level of effort to complete tasks. We have visited the site and understand the scope, objective, challenges and level of effort needed to complete each of the scope items.

Proposal Certifications
Per Addendum 2, certifications are not required to be
submitted with the proposal.

Quality Assurance/Quality Control (QA/QC)
Quality at Michael Baker is non-negotiable. We
are committed to completing projects that meet
your requirements with respect to scope, schedule,
budget, and technical quality. To that end, QA/QC
Lead, Randy Ratzlaff, PE, will implement the plan
outlined below to ensure we meet the City of Tustin’s
expectations for quality and completeness on this
project. The QA/QC plan identifies project-specific
resources and actions necessary to provide the
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 5 CITY OF TUSTIN | CIP NO. 70263
BUDGET
SCOPE

QUALITY SCHEDULE
best opportunity for project
deliverables to meet Michael
Baker’s and the City’s
quality expectations and
requirements, and applicable
professional standards for
technical quality. This QA/QC
plan is a critical part of project
initiation, which includes our
Quality Verification Forms (QVF).

As part of this project, the QA/QC objectives are to:

1. Identify key project quality roles and resources

2. Identify and describe quality processes and
procedures applicable to the project (a collection
of various practice and/or discipline quality
procedures)

3. Identify applicable required specific technical
references

4. Be the one-stop reference guide for Project
Manager, Eric Spangler, PE, and other project
staff in carrying out steps related to quality control
and quality assurance

5. Perform a formal constructability review at the
60% and 90% design stages and provide written
certification that the plans are coordinated and
buildable.

Subconsultant Control
All subconsultants are identified in this proposal. The subconsultant LaBelle Marvin, Inc. (LMI) will meet with the Deputy Project Manager on a monthly basis while
the subconsultant’s scope of work is being performed.

Michael Baker will maintain one point of contact with the subconsultant, require the subconsultant to adhere to
the QA/QC procedures, and require a monthly progress
report detailing work completed by task, percentage
complete by task versus budget, updated schedule,
budget status, upcoming work, and issues/risks
impacting scope, schedule, or budget.

Implementation Phase
Project coordination is essential to the successful
completion of this project. Michael Baker will coordinate between the project development team and project
stakeholders throughout the entire project duration,
which is projected to last for 15 months. A project kickoff meeting will be conducted within three (3) weeks of
notice-to-proceed (NTP) to confirm Scope of Services
and design parameters. Status meetings will be held
monthly throughout the duration of the project to track progress and facilitate the flow of information between the City and Michael Baker.

Figure 4. Quality Verification Forms (QVF) are created for all City Submittals to provide quality and accuracy.

Ensure Compliance with
Quality Standards
Document Quality Control
Activities
Facilitate Accountability and
Transparency
The QVF is the “final” check to ensure
deliverable Quality BEFORE submittal to the
client.

A verification list of completed Quality Control
activities.

Each item requires a sign-off by a responsible
person.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 6 CITY OF TUSTIN | CIP NO. 70263
Scope of Work
Task 1: Project Management, Meetings,and
Coordination

1.1 COORDINATION MEETINGS
Within three weeks of receiving the NTP, Michael Baker
will organize a project kickoff meeting with the City
to discuss project scope and schedule, understand
concerns relative to project delivery, and other items
to initiate the project. Michael Baker will organize and attend other meetings to complete the design. The fee
has been established based on an initial estimate of
one (1) kickoff meeting, fifteen (15) monthly progress
meetings and four (4) miscellaneous meetings for
this project. Michael Baker will prepare agendas and
meeting minutes and will distribute them to the City and other attendees or organizations, as required. We are
budgeting 3 hours for each meeting to account for preand post-meeting activities.

1.2 PROJECT COORDINATION AND MANAGEMENT
Michael Baker will prepare a detailed project schedule
(MS Project or equivalent) and update it on a monthly
basis. The schedule will identify all tasks, milestones, and a critical path. Monthly progress reports will be
prepared and submitted to the City with invoices.

Progress reports will include work completed by task,
percentage complete by task versus budget, updated
schedule with critical path, budget status, upcoming
work, and issues/risks impacting scope, schedule, or
budget.

Task 2 – Field Visit and Site Assessment
Michael Baker will conduct a site visit, meet with
the City at the site, review pavement rehabilitation
strategies, and review ADA improvements to better
understand the existing conditions and improvement
optimization.

We will photo-document the street within the project
limits to inventory existing signs, pavement markings,
striping, and painted curb. Michael Baker will create a photo log of key project areas.

Task 3 – Research and Review of Available Data
Michael Baker will research, obtain, and review
all available data as a reference to prepare the
preliminary and final Plans, Specifications, and
Estimates (PS&E). Data will include, but is not limited to: State, County, City, utility, and other records/
documents; existing street, traffic signal, storm
drain, gas, sewer, and water main improvement plans;
topographic data maps, record drawings; wet and dry
utility plans; geotechnical reports; survey centerline and private property monument data; and other pertinent
information. Utility research and coordination will be
performed by the City and provided to Michael Baker.

Michael Baker will plot available information into base maps for use in the design plans.

Michael Baker will prepare a table summarizing the
obtained data and submit a copy to the City and utility agencies. Michael Baker will review this information
with the City prior to beginning preliminary design.

Task 4 - Structural Pavement Investigation with
Design Alternatives and Report
Michael Baker’s team includes pavement design and
rehabilitation experts from LMI on this project. The
following proposed structural investigation will utilize a combination of in-place deflection strength testing, by FWD, defining current roadway strengths combined
with the proposed pavement core sampling to explore
and define present street conditions, layer thicknesses and where detectable, prior resurfacing history.

Laboratory soil strength testing, projections of future traffic use, in conjunction with in-place strength testing, will be utilized to develop appropriate replacement
sections with current structural needs providing cost
effective reinforcement alternatives and innovative
pavement solutions, i.e. Asphalt Concrete Rubber Hot
Mix Overlays, Full Depth Reclamation (FDR) or Cold In
Place Recycling (CIR).

4.1 IN-PLACE DEFLECTION TESTING AND GPR

THICKNESS SCANNING
Non-Destructive Pavement Deflection (CA 356) data
will be gathered from each existing traveled lane, at
100’ to 200’ testing intervals, using LaBelle Marvin
Inc.’s JILS FWD equipment, imposing a series of 9,000
pound loads per California Test Method 356. LMI’s
FWD testing equipment, operator, and recordS will be
provided by LMI.
▬ Data obtained will include ten (10) sensor readings
recorded within the deflection basin at each test
point. Pavement deflection sensors are generally
spaced 6” to 12” on center, defining the specific
pavement deflection basin under loading. During
deflection testing operations, notes of visual
pavement conditions and/or distress, cross streets,
presence or absence of curb and gutter, and other
such observations will be logged. Correlating
data will include pavement temperature and GPS
documentation at each test location.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 7 CITY OF TUSTIN | CIP NO. 70263
▬ Data Analysis will provide a typed tabulation
of all deflection measurements and field notes
locating cross streets, pertinent landmarks, field
conditions, etc will be included within the final
report. The tabulation will include the reading of
all sensors, as well as an equivalent Traveling
Deflectometer deflection at the loading point.

GPR data will supplement pavement core thickness
information providing a better understanding of
historical as-built section, changes in section,
and as importantly location of change. This is a
substantial cost saving to the City while providing
greater thickness information. The measured asphalt
concrete pavement thickness shall be scanned twice
every linear foot mapped by depth and location and
provided onto aerial imagery for geo-referencing.

This information is critical to the design team, where
proposed resurfacing is forecasted.

4.2 PAVEMENT CORING AND SOIL BORING
A total of thirty-three (33) pavement coring and
subsurface sampling locations will be performed at
pre-selected locations to determine the thickness
of the existing structural section including but not
limited to asphalt concrete layer(s), buried Portland
cement concrete layer(s) if any, and aggregate base
layer, if any. Borings extend to a maximum three (3’)
foot depth from finish surface.
▬ Underground Service Alert (USA Dig-Alert) will
be notified and a meeting held, if requested,
with concerned utilities to relocate test sites as
necessary. Sample locations will be backfilled
and patched with asphalt concrete, per City
requirements.
▬ All samples will be labeled and transport back to
our certified Caltrans and AASHTO accredited
materials laboratory for further analysis.
▬ Professional Traffic Control will be provided per
WATCH/MUTCD standards.

4.3 LABORATORY MATERIALS TESTING
Subgrade soil samples taken in the field will be
identified, labeled, and measured during the
sampling process. Samples will be transported
back to LaBelle Marvin’s Caltrans certified soils
and asphalt laboratory. Data developed during the
laboratory testing will be utilized to project probable field support conditions during construction and
highlight where appropriate special care may be
required during roadway preparation.

Evaluation of the present pavement thicknesses utilizing component analysis with R-value data will be combined
with future traffic estimates (Traffic Index provided by City) for design and development of suitable, alternative replacement sections.

Laboratory tests included within this investigation are as follows:
▬ Moisture Content Tests (CA 226): Subgrade soil
samples taken in the field will be visually classified
and the in-situ moisture content will be determined
per location.
▬ R-Value Tests (CA 301): Representative sample(s)
will be selected and tested for R- Value (soil
strength) determinations on the subgrade. A total of
three (3) R-values will be performed.

4.4 VISUAL SITE EVALUATIONS
John Warrick, PE, will perform a site evaluation of
all asphalt concrete segments. Pavement conditions
will be recorded for the purposes of compiling the
recommendation plan(s) and report. LMI will compare
field conditions with thickness data obtained during
core sampling and with component analysis based on
laboratory subgrade strength testing, deflection testing, and GPR thickness scanning.

4.5 STRUCTURAL DESIGNED REHABILITATION

ALTERNATIVES
John Warrick will supervise all operations and
incorporate results of deflection and materials testing with observed pavement conditions. Engineered
recommendations for alternate methods of pavement
rehabilitation for the lane(s) studied based upon
deflection analysis in conjunction with the proposed
materials investigation will be provided.

A minimum of three (3) pavement rehabilitation
strategies, if feasible, will be developed meeting current structural needs and reinforcement requirements based
upon the California Highway Design Manual for Flexible
Pavement and Roadway Rehabilitation.

Where sustainable/innovative pavement solutions are
considered, Full Depth Reclamation (FDR) or Cold-InPlace Recycling (CIR) will be explored within the final report.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 8 CITY OF TUSTIN | CIP NO. 70263

4.6 PAVEMENT STRUCTURAL INVESTIGATION
REPORT
John Warrick will prepare the final pavement
structural investigation report. The deliverables will
include all data developed during the investigation
with design rehabilitation alternatives; structural
replacement sections for areas of reconstruction,
in-place strength testing data and field and laboratory test data. All services will be supervised by the Civil Engineer specializing in the evaluation and design
of pavement systems and Registered in the State of
California.

Task 5 – Water Quality Management Plan

5.1 DRAFT WATER QUALITY MANAGEMENT PLAN
(WQMP)
Michael Baker will develop the concept level WQMP
in accordance with the criteria of the County of
Orange and the City of Tustin MS4 requirements. Due
to groundwater contamination in the area and space
constraints within City right of way, it is assumed
that proprietary devices will be installed as water
quality BMPs in two (2) locations. The draft WQMP
will address BMP selection and proposed location for
BMPs.

5.2 FINAL WATER QUALITY MANAGEMENT PLAN
Based on the comments received from the draft
WQMP, Michael Baker will prepare a final WQMP
report which will include water quality BMP design
and details so they are constructable in the field. The WQMP plans and details will be part of the PS&E set.

Michael Baker will also prepare an Operation and
Maintenance Plan for the water quality BMPs.

Task 6 – Geometric Approval Drawing (GAD)
Exhibits for Bike Lane Improvements
Michael Baker will prepare two (2) GAD Exhibits for
review and coordination with the City. One exhibit will be prepared for a design option with no right-of-way
impacts as shown in Exhibit 1. This option is what this Scope of Services is based on. A second GAD exhibit
will be prepared showing roadway widening, right-ofway acquisition, and utility relocations for the City’s consideration. This option is not included in the PS&E
portion of this Scope of Services.

Task 7 – Preliminary Engineering (30% Design)
Michael Baker will prepare a CAD basemap of the
existing condition. Existing curb lines and striping will be drawn in CAD using a combination of the survey
topography (provided by the City), high resolution
aerial photographs, and As-Built plans. Upon
completion of the basemap, Michael will prepare 30%
design plans that include a title sheet, general notes, typical sections, demolition and disposition, median
modifications, curb ramp replacement, water quality
BMP’s, conceptual striping, conceptual traffic signal
modifications, and conceptual landscaping. The plans
will address limits of pavement rehabilitation and
identification of pavement treatment strategies. Traffic signal loop replacement will be shown on the signing
and striping plans with the exception of the Jamboree
Road/El Camino Real intersection, which will be
shown on the traffic signal modification plan for this
intersection. The plans will identify up to three (3) ADA curb ramps that will be replaced due to damage or noncompliance with ADA requirements. A list of anticipated sheets is provided in Table 1, below.

Table 1. Task 7 Drawing Sheet List
TASK SCALE NO. OF SHEETS
Title Sheet Varies 1
General Notes, Abbreviations, and Legend Varies 1
Typical Sections Varies 1
Construction Details Varies 1
Roadway Layout 1"=40' 8
Curb Ramp Detail Plan 1"=5' 1
Drainage and Water Quality Plan 1"=20' 1
Stage Construction Plan 1”=80’ 1
Signing and Striping Plan 1"=40' 6
Traffic Signal Plan (at Jamboree Rd/El Camino Real intersection) 1”=40’ 1 Landscape/Irrigation Plan 1”=40’ 4
TOTAL SHEETS 26
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 9 CITY OF TUSTIN | CIP NO. 70263
A preliminary engineer’s opinion of probable
construction cost, draft project specifications, and a
brief basis of design memorandum will accompany
the 30% design submittal. Technical specifications
will be prepared conforming to 2024 Greenbook
Standards. It is assumed that the City will provide
front-end bid specifications to be included in the
project specifications. The technical specifications
will be prepared to restrict the Contractor to certain
construction timelines, coordination with bus
schedules, and require coordination with the utility
owners within the project.

Task 7B - NEPA Support Services
Michael Baker will conduct a database search of
the California Department of Fish and Wildlife’s
California Natural Diversity Database (CNDDB), the
California Native Plant Society’s Inventory of Rare
and Endangered Plants of California (RPI), and
the U.S. Fish and Wildlife Service’s Information for
Planning and Consultation (IPaC) project planning
tool, Critical Habitat online mapper, and National
Wetlands Inventory (NWI) mapping to identify any
special-status or sensitive biological resources
known to occur within the vicinity of the project
site. Michael Baker will also review historic/current
aerial photographs and topographic maps to assess
existing site conditions and any ecological changes
that have occurred within the project sites. Following
the literature review, Michael Baker will conduct a
field survey of the project site to document baseline
biological conditions.

Michael Baker will then prepare a biological resource
memorandum summarizing the information and
results obtained during the literature review and
field survey; document plant, wildlife, and vegetation
communities observed; and determine the potential
for any special-status species or sensitive resources
to occur on or within the vicinity of the project site.

Site photographs taken during the field survey and
Geographic Information Systems (GIS) figures will be
included in the report to further enhance written text
and visually identify specific biological information
as it relates to the project site. In addition, the memo report will analyze potential project-related impacts
to biological resources, and identify any additional
biological surveys, mitigation measures, and/or
regulatory approvals that may be required. The
analysis of biological resources will be prepared to
support a Categorical Exclusion pursuant to NEPA.

Task 8 – Intermediate Engineering (60% Design)
Michael Baker will refine the design and prepare
60% plans incorporating City review comments and
advancing all design elements to a level suitable
for detailed review and inter-agency coordination.

The 60% design will advance geometric design,
including lane configurations, transitions and tie-ins
and signing and striping plans, including striping
layouts, legends, and sign schedules. Michael Baker
will develop preliminary traffic control concepts for
construction staging in order to provide sufficient
notes/specifications for contractor-prepared traffic
control plans. As part of the 60% Design Submittal, a
constructability review and quality control review will be performed.

Task 9 – Final Plans, Specifications and Estimate
(PS&E)
Michael Baker will prepare complete, bid-ready
PS&E documents suitable for advertisement and
constructions.

The 90% submittal shall represent a near-final set of
documents suitable for comprehensive City review.

No new design elements, scope changes, or major
revisions shall be introduced at the 90% submittal
unless specifically requested by the City. The 90%
submittal shall incorporate all previous comments
and finalize all design elements, quantity calculations, construction bid item breakdowns, and project
specifications. As part of the 90% Design Submittal, a
constructability review and quality control review will be performed.

The 100% submittal shall incorporate all final City
comments, and Michael Baker will deliver signed,
sealed, and complete PS&E documents.

All deliverables will be made to the City in PDF format and transmitted to the City electronically.

Task 10 Caltrans Encroachment Permit
Processing
Michael Baker will process an Encroachment Permit
through the Caltrans District 12 permits office. Plans
will be prepared to City of Tustin standards in Autocad format. Caltrans standard plans will be utilized for
traffic control measures. This task assumes only
standard design features will be proposed within
Caltrans right-of-way and excludes the preparation
and processing of any Design Standard Decision
Documents (DSDDs) both for existing and proposed
design features.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 10 CITY OF TUSTIN | CIP NO. 70263
Task 11 Bid Support
Michael Baker will assist the City during the bidding
phase of the Project by providing clarification of
Michael Baker prepared construction documents.

Michael Baker will provide the following:
▬ Attend pre-bid meetings, interpret the documents
as requested, and maintain a written record of
questions and interpretations provided.
▬ Provide clarification of construction documents
during the bidding period as required. Coordinate
all efforts with the City.

Task 12 Construction Support

12.1 SHOP DRAWING REVIEW
Michael Baker will process submittals, including
receipt, review, and appropriate action on shop
drawings, product data, samples, and other
submittals for conformance with the intent of the
contract documents. Michael Baker’s comments
on such vendor data will be provided to the City’s
general contractor for further processing. Multiple
reviews of re-submittals that do not adequately
address the initial review comments are not included
in this Scope of Services.

12.2 CONSTRUCTION PLAN INTERPRETATION
Michael Baker will provide plan interpretation of
plans prepared by Michael Baker and recommend
plan revisions based upon field conditions
encountered during construction. Michael Baker
will also review and assist City in evaluating the
contractor’s change order requests for Michael
Baker’s design improvements.

12.3 CONSTRUCTION MEETINGS AND

OBSERVATION
Michael Baker will attend field meetings at the City’s
request to observe the progress of construction and
report on the construction’s substantial compliance
with plans prepared by Michael Baker.

12.4 PUNCH LIST, APPROVAL AND CLOSEOUT
At 100% completion of design improvements,
Michael Baker will perform a final field walk and
comment on the improvements as to conformance
with the plans prepared by Michael Baker and
assist the City in obtaining final acceptance of
improvements by the City. The final field walk will
be performed at City’s request with City or it’s
representative and Contractor’s superintendent.

Task 13 Record Drawings
Michael Baker will revise the plans approved by the City for the Project, based upon field changes and revisions Michael Baker prepared (redlined prints) as provided by the City’s Contractor. PDF copies and CAD Format of
Final Record and Project Drawings will be provided to
the City.

Assumptions:
▬ The City will provide all survey data needed for this Project. ▬ The City will provide centerline and right-of-way information for this Project in CAD.
▬ The City will be responsible for providing utility coordination with all affected utilities.
▬ The City has performed utility research and will provide Michael Baker with utility as-builts.
▬ The City will provide a template for Sections A-D of the Specifications.
▬ The City of Irvine is preparing design plans for the
intersection of Jamboree Road and Irvine Boulevard. The finalized plans will be provided by the City.
▬ The City will be responsible for ROW Certification and all coordination with Caltrans.
▬ The limits of this project will remain within existing City right of way. No additional right of way will need to be acquired as part of this project.
▬ The Bucknum Report will be utilized as a bid document for the contractor to address any sidewalk maintenance items.

Standard details will be prepared to address maintenance repairs utilizing the Bucknum Report for locations.
▬ Up to three (3) ADA Curb Ramps will be reconstructed.

Exclusions:
▬ CEQA/NEPA Processing
▬ Design Standard Decision Documents (DSDD’s)
▬ Dry Utility Design
▬ Hydrology/Hydraulic Analysis
▬ Infiltration Testing
▬ Intersection Grid Details
▬ Landscape/Irrigation Improvements
▬ Permit Fees
▬ Right-of Way Acquisition
▬ Stormwater Pollution Pollution Prevention Plan (SWPPP) ▬ Street Widening
▬ Survey
▬ Traffic Control Plans (to be provided by Contractor)
▬ Utility Research & Coordination (to be provided by City) ▬ Utility Relocations
▬ Monument Sign Design
▬ Plant surveys, existing tree evaluations, tree relocations ▬ Water Meter Connections (assumed irrigation will use existing water meter)
▬ Electrical Design for irrigation system (assumed using power at existing irrigation controller)
▬ Soils Testing or Analysis
▬ Relocating the Entry Monument
▬ Structural Design
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 11 CITY OF TUSTIN | CIP NO. 70263

DELIVERAB LES FORMAT TEAM MEMBER

RESPONSIBLE
Project Schedule PDF Eric Spangler
Monthly Progress Reports PDF Eric Spangler
Meeting Agendas & Minutes PDF Eric Spangler
Preliminary Engineering (30% Design)
Structural Pavement Investigation with Design Alternatives Report PDF John Warrick Geometric Exhibits for Bikeway Design PDF David Hoopfer Basis of Design Memorandum PDF David Hoopfer
Draft Water Quality Management Plan PDF Terrence Chen
Design Plans PDF David Hoopfer
Specifications PDF Brian Fujimoto
Estimate PDF David Hoopfer
Intermediate Engineering (60% Design)
Final Water Quality Management Plan PDF Terrence Chen
60% Design Plans PDF David Hoopfer
60% Specifications PDF & Word Brian Fujimoto
60% Estimate PDF David Hoopfer
Comment Response Matrix Addressing Comments from 30% Design PDF David Hoopfer Constructability Review Memorandum PDF Randy Ratzlaff
QA/QC Certification Package PDF Randy Ratzlaff
Final PS&E
Final Water Quality Management Plan PDF Terrence Chen
90% Design Plans PDF David Hoopfer
90% Specifications PDF & Word Brian Fujimoto
90% Estimate PDF David Hoopfer
Detailed Quantity Calculations PDF & Excel David Hoopfer Comment Response Matrix Addressing Comments from 60% Design PDF David Hoopfer Constructability Review Memorandum PDF Randy Ratzlaff
QA/QC Certification Package PDF Randy Ratzlaff
100% Design Plans
Final Water Quality Management Plan PDF Terrence Chen
Final Design Plans PDF & CAD David Hoopfer
Final Specifications PDF & Word Brian Fujimoto
Final Estimate PDF David Hoopfer
Bid Schedule Excel Brian Fujimoto
Comment Response Matrix Addressing Comments from 90% Design PDF David Hoopfer Record Drawings
As-Built Drawings PDF & CAD David Hooper
Table 2. Deliverables Matrix
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 12 CITY OF TUSTIN | CIP NO. 70263
Deputy Project Manager
David Hoopfer, PE 🔑
🔑 Key Personnel

PROJECT TEAM
Roadway Design
Benjamin Costello, PE
Rick Howe, PE
Cody Haines, PE
Specifications
Brian Fujimoto, EIT
Jennifer Chan, PE
Pavement Design
John Warrick, PE 1
Steve Marvin, PE 1
Traffic Engineering
Kim Preap, PE, TE
Saeed Kerayehchian, PE, PTOE
Aldrin Dorado
Christian Montes
Landscape Architecture
Jeremy Franzini, PLA
Alaa Chaabani, PLA
Drainage
Jacqueline Kim, PE
Water Quality
Terrence Chen, PE, QSP/D
🔑
🔑
Project Manager
Eric Spangler, PE
🔑
🔑
Subconsultant:: 1 LaBelle Marvin
🔑
Principal-in-Charge
Jeff McClure, PE
QC Manager
Randy Ratzlaff, PE🔑
🔑
🔑

2. TEAM ORGANIZATION
Personnel Qualifications
This organization chart presents Michael Baker’s team for the pavement resurfacing on Jamboree Road between Michelle Drive and Portola Parkway. Project Manager Eric Spangler, PE, TE, has more than 26 years of experience working on roadway and traffic projects throughout Orange County. Our Deputy Project Manager, David Hoopfer, PE, has extensive experience working with and in the City of Tustin, including the Tustin Legacy Neighborhood D South Infrastructure Improvements project, which is currently underway. David has 20 years of experience in a variety of areas including master-planned residential developments, industrial developments, major arterial roadways, and backbone infrastructure design for future developments.

Subconsultant
Michael Baker is teaming with LaBelle Marvin, Inc. (LMI), which will provide evaluation and design of the pavement. LMI is a full-service pavement engineering firm and recognized leader in the evaluation of asphalt concrete pavements. With a staff of 11 professional, technical, and support personnel and an AASHTOaccredited soils and asphalt concrete laboratory, LMI provides field and laboratory evaluation, pavement design, rehabilitation recommendations, materials testing, and construction inspection across public streets and highways, airfields, and commercial and private pavement systems. Over 47 years, LMI has evaluated and recommended rehabilitation for more than 20,000 lane miles across the Western United States, completing over 1,500 projects in the past two years alone.

The City will receive a team of experienced roadway and traffic professionals dedicated to delivering highquality, efficient, and innovative pavement and design solutions to benefit the safety, growth, and resilience of the City of Tustin.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 13 CITY OF TUSTIN | CIP NO. 70263
Name | Role |Yrs. Exp Time Commitment Responsibilities
Eric Spangler, PE, TE
Project Manager
26 years experience
50% Committed Eric will manage the project schedule and budget to ensure the project is on track with the City’s expectations. He will also provide high-level oversight of the design.

David Hoopfer, PE
Deputy Project Manager
22 years experience
80% Committed
David will manage the design effort and act as the day-today contact with the City.

Randy Ratzlaff, PE
QC Manager
33 years experience
25% Committed Randy will be responsible for implementing and maintaining the QA/QC procedure to ensure the products accuracy. Randy will perform the QA/QC reviews and preparing the QA/QC certification package.

Ben Costello, PE
Roadway Design
6 years experience
50% Committed
Ben will assist in the design of the street improvements and ADA improvements.

Rick Howe, PE
Roadway Design
24 years experience
50% Committed
Rick will lead the design of the street improvements and ADA improvements.

Brian Fujimoto, EIT
Specifications
28 years experience
50% Committed
Brian will prepare the technical specifications, estimate, and bid schedule.

Kim Preap, PE, TE
Traffic Engineering
24 years experience
50% Committed
Kim will oversee the design of the signing and striping plans, traffic signal modifications, and traffic control plans.

Saeed Kerayehchian, PE
Traffic Engineering
18 years experience
70% Committed
Saeed will prepare signing and striping plans, traffic signal modifications, and traffic control plans.

John Warrick, PE
Pavement Design
20 years experience
80% Committed
John will prepare the Pavement Investigation with Design Alternatives Report.

K E Y P E R S O N N E L T I M E C O M M I T M E N T, R O L E , A N D

RESPONSIBILITIES
Resumes for key staff are included in Appendix A.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 14 CITY OF TUSTIN | CIP NO. 70263

3. STATEMENT OF QUALIFICATIONS
2025 ENR RANKINGS

THE TOP

DESIGN FIRMS
500
27 Top 500 Design Firms
18 Top 100 Pure Designers
7 Bridges
7 Dams & Reservoirs
9 Construction Management
13 Transportation
15 Water Supply
17 Airports
17 Highways
22 Mass Transit & Rail
Michael Baker History
Michael Baker, founded in 1940, is a leading global engineering and consulting firm providing planning, architectural, environmental, construction, and program management services, along with information technology and communications solutions. We support municipal, state, and federal agencies and commercial clients by delivering innovative, sustainable solutions for infrastructure and the environment. Our capabilities span the full project life cycle across highways, roadways, and bridges; environmental planning and engineering; and facility design and construction. Additional markets include community revitalization, smart cities/healthy communities, energy, master planned and military base development, rail and metro, residential/commercial/industrial/ institutional development, sports and recreation, sustainable design and LEED, and water infrastructure—including water supply, wastewater treatment, recycled water, and desalination.

Services
Michael Baker’s professionals specialize in civil engineering, transportation planning, environmental planning/permitting, and public involvement—capabilities we will apply to this program. Our team delivers innovative, cost-effective design solutions while managing multiple complex projects. With deep in-house resources and the ability to quickly mobilize multidisciplinary teams, we provide outstanding support for the City across the potentially broad scope of this contract, including:
▬ Pavement Engineering & Management
▬ Civil Engineering (Streets, Sewer, Storm Drain, ADA Design) ▬ Water/Wastewater Design
▬ Traffic Engineering and Transportation Planning (Signal Communication and Integration, Data Collection Mobility Studies, Active Transportation)
▬ Land Surveying & Geographic Information Systems (GIS) (Field Survey, Mapping, Easements, Plats & Legals, Database) ▬ Environmental Planning and Design (California Environmental Quality Act (CEQA), National Environmental Policy Act (NEPA), Studies Coordination)
▬ Environmental Compliance (Wastewater, FOG, HazMat, Regulatory Coordination)
Michael Baker’s Resources
For more than 30 years, our California offices have provided pavement engineering and geospatial technology services statewide. We offer 300+ staff across pavement engineering/management, GIS, database management, and IT. As one of the few full-design transportation firms operating under one roof, we deliver comprehensive asset inventory and pavement management services—from detailed condition evaluation and rehabilitation recommendations to life-cycle cost analysis.

EXPERIENCE WITH THE
CITY
Michael Baker has
performed almost 100 task
orders for the City of Tustin,
including Irvine and Legacy
Road Overlay; Irvine
Boulevard / Jamboree
Road Street Improvements;
Pasadena Avenue Street
Overlay and Storm Drain
Improvements; and Tustin
Ranch Road Improvements
among many others.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 15 CITY OF TUSTIN | CIP NO. 70263
Knowledge and Experience
Pavement Rehabilitation and Design
We are experienced in all phases of pavement rehabilitation—from evaluation and design through construction staging, specifications, constructability and design through construction staging, specifications, constructability review, PS&E, and post-design services—enabling practical, cost effective maintenance plans for our clients.

Pavement Technologies
Michael Baker uses advanced technologies—FWD, GPR, high-speed profilers, Laser Crack Measurement System (LCMS), and mobile LiDAR—to deliver efficient, quality-focused pavement evaluations. We stay current with evolving methods and apply a range of rehabilitation techniques (e.g., new binders, additives, and polymers) to extend pavement life. Our pavement designs emphasize realistic, economical solutions tailored to the City, and can incorporate green infrastructure and recycling technologies to improve water quality and reduce emissions.

We are leading practitioners in applying LiDAR to collect roadway, airport, utility, and rail/transit data and to support smart-vehicle initiatives, including connected-vehicle deployment and testing. We have also used LiDAR to support design of lengthy transmission mains as a cost-saving measure. Our complementary survey capabilities include Real-Time Kinematic (RTK) Global Navigation Satellite System (GNSS), terrestrial scanning, manual methods, and inspection-grade Unmanned Aircraft System (UAS).

ADA Improvements
As part of traffic improvement projects, existing access ramps, sidewalks, and driveway approaches may not be current with ADA compliance standards.

Michael Baker routinely reviews current Title 24, ADA regulations to identify updates to standards. In addition, we are aware of the current Caltrans changes

PREVIOUS EXPERIENCE

ON JAMBOREE ROAD
Michael Baker served
as the design and traffic
engineering consultant
for improvements
to Jamboree Road/
Santiago Canyon Road
(5,027 linear feet), with
the primary objective of
improving multi- modal
safety in response to
the history of collisions
in the area. The scope
of work included street
widening, ADA-compliant
sidewalk improvements,
equestrian trail
enhancements, and the
incorporation of green
street elements. Surface
work included removing
and replacing curbs and
gutters, asphalt concrete
pavement, and medians,
as well as reconfiguring
roadway profiles and
travel lane geometry,
including installing rightturn pockets.
to their ADA guidelines restricting gradients to less than the maximum ADA compliance standards. Michael Baker has designed hundreds of Caltrans-level ADA applications across Southern California.

Traffic Engineering
Signing and Striping/Traffic Control Plans
Michael Baker prepares signing and striping, stage construction, and traffic control plans for streets and freeways to maintain safety and multimodal access through construction. We follow the California Manual on Uniform Traffic Control Devices (CA MUTCD) and City Transportation Design Procedures, and develop detour plans for complex closures to guide motorists, pedestrians, and bicyclists. Our team prepares and processes detour, traffic control, and final signing and striping plans; all signs and markings are designed to be clear, uniform, and compliant with the California Vehicle Code (CVC) and CA MUTCD.

Bicycle Facility Improvements
Michael Baker’s transportation staff bring extensive experience with traffic calming, road diets, complete streets, bicycle and pedestrian facilities, streetscape design, ADA access, and utilities coordination. We integrate current best practices—such as parking-separated Class IV curb-adjacent bike lanes, pedestrian-activated warnings, bicycle bend-outs, and other proven treatments. Typical elements include bulb-outs, wayfinding, street furniture, widened sidewalks, enhanced crosswalks and transit stops, ADA curb ramps, pavement reconstruction/ resurfacing, pedestrian lighting, signal upgrades, Rectangular Rapid Flashing Beacons (RRFBs), landscaping/ street trees, and utility/obstruction relocations, along with other sustainable design features.

Resumes
Resumes for key staff are included in Appendix A.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 16 CITY OF TUSTIN | CIP NO. 70263
Tustin Legacy
Neighborhood D
South Infrastructure
Improvements
Michael Baker prepared a tentative
map, final map, and final design
plans, specifications, and estimates
for the backbone streets within
Neighborhood D South.

The project site is approximately
103 acres bounded by Armstrong
Avenue, Warner Avenue,
Legacy Road, and Tustin Ranch
Road. The project consists of
approximately 13,000 feet of
backbone infrastructure including
streets, storm drain, sanitary sewer,
domestic water, recycled water,
dry utilities, traffic signals, signing
and striping, water quality design,
a Subarea Master Plan for Irvine
Ranch Water District (IRWD), and
landscape architecture design for
Tustin Legacy Park.

Cow Camp Road
Extension
Rancho Mission Viejo, CA
Michael Baker provided design
services for the nearly five-mile
Cow Camp Road Project, a critical
component of the Rancho Mission
Viejo Development. It will serve
as the backbone infrastructure for
a community that will ultimately
include more than 14,000 homes
and five million square feet of retail
and commercial space. The project
features nearly five miles of arterial
roadway over 10 intersecting local
streets, bridges spanning Chiquita
Canyon, Gobernadora Canyon,
and San Juan Creek, and an
interface with Caltrans at Ortega
Highway requiring an Intersection
Control Evaluation (ICE). Additional
elements include extensive water
and sewer facilities, regional
stormwater management
systems, water quality basins,
and coordination with multiple
permitting agencies.

Client: City of
Tustin
300 Centennial
Way, Tustin, CA
92780
Contact:

Mark
Khudadatov
Principal
Engineer
mkhudadatov@
tustica.org
714.573.3161
Completion
date: 2021
Project costs:
$1.8M design
fee
Team
Members:

David Hoopfer -
Project Manager
Jennifer ChanRoadway
Engineer
Jeremy Franzini
- Landscape
Architecture
Client: Rancho
Mission Viejo,
LLC
28811 Ortega
Hwy, Mission
Viejo, CA 92675
Contact: Jim
Yates
VP Infrastructure
Engineering
jyates@
ranchomv.com
949-795-8817
Completion
date: 2021
Project costs:
$6.9M
Team
Members:

David Hoopfer -
Civil Engineer
Randy Ratzlaff -
Senior Engineer
Brian Fujimoto
- Technical
Specialist
Jennifer Chan
- Roadway
Engineer
▬ Traffic Engineering
▬ Roadway design
▬ Drainage design
▬ Water quality design
▬ Landscape design
▬ PS&E preparation
▬ Roadway design
▬ Drainage Design
▬ Bike lane/bike path design
▬ Utility coordination
▬ Preparation of traffic signal, signing, and
striping
▬ Erosion control design

PROJECT RELEVANCE PROJECT RELEVANCE

REPRESENTATIVE PROJECTS
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 17 CITY OF TUSTIN | CIP NO. 70263
Pacific Avenue
Cycle Track Project
and Corridor
Improvements Project
Long Beach, CA
Michael Baker was hired by the City
to complete a PS&E for two fastpaced projects to be constructed before the LA 2028 Olympics.

The 1.6-mile southern “Cycle
Track” project on Pacific Avenue
from Ocean Blvd to Pacific Coast
Highway (PCH) included a roaddiet conversion from 2 vehicle lanes in each direction to 1 vehicle
lane and a curbed buffer-island
separated Class IV Cycle-track
in each direction. Complexities
included the Metro A-Line light
rail in the median of Pacific Ave,
requiring LA Metro and California
Public Utilities Commission (CPUC)
approval, emergency vehicle
access at roadway pinch points,
minimizing loss of on-street parking,
accommodating driveway ingress/
egress, accommodating bus stops
along the corridor and minimizing
motor vehicle delay. The project also
included installation of several new
bus shelters for Long Beach Transit,
and included sidewalk and ADA curb
ramp improvements.

Hermosa Avenue
Pavement Resurfacing
& Streetscape
Improvements
Hermosa Beach, CA
Michael Baker prepared the
PS&E for a high-profile, fasttrack pavement resurfacing and streetscape project for the city of
Hermosa Beach. Due to a tight
funding deadline, it completed the
design quickly, while providing
a high-quality PS&E. To revamp
the thoroughfare, Michael Baker
designed pavement cold milling
and asphalt concrete overlay for
4,555 linear feet of roadway, from
10th Street to Greenwich Village
Road, and upgraded 46 curb ramps
to current ADA standards. It also
designed three signal modifications,
new signal loop detectors, eight
bus benches and a bus shelter,
pavement delineation, curb
markings, and removed brick paver
banding along the beachfront bike
path known as “The Strand.”
Client: City of
Long Beach
6335 Myrtle Ave,
Long Beach, CA
90744
Contact: Annie
Abuana
Transportation
Program
Manager
annie.abuana@
longbeach.gov
562.570.6342
Completion
date: Ongoing
Project costs:
$4.175M
Team
Members:

Eric Spangler -
Project Manager
Saeed Kerayehchian
- Traffic/ITS
Jeremy Franzini
- Landscape
Architecture
Brian Fujimoto
- Technical
Specialist
Kim Preap -
Traffic ITS
Client: City
of Hermosa
Beach
1315 Valley
Dr., Hermosa
Beach, CA
90254
Contact:

Lucho
Rodriguez
Deputy City
Engineer
lrodriguez@
hermosabch.
org
310-318-0210
Completion
date: 2025
Project costs:
$448K design
fee
Team
Members:

Eric Spangler -
Projec Manager
Brian Fujimoto
- Technical
Specialist
▬ PS&E preparation
▬ ADA curb ramp improvements
▬ Bike lane design
▬ Roadway design
▬ PS&E preparation
▬ Pavement rehabilitation
▬ Curb ramps
▬ Bulb-out curb returns
▬ Decorative design

PROJECT RELEVANCE

PROJECT RELEVANCE
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 18 CITY OF TUSTIN | CIP NO. 70263
I-605/Katella Interchange
Improvements
Los Alamitos, CA
Michael Baker provided design
and environmental services in the
PID, PA/ED and PS&E Phases of
the project under Caltrans District
12 oversight for improvements
to the interchange at I-605 and
Katella Avenue. The project
involves widening Katella Avenue
to add bike lanes and bike refuge
lanes, provide standard lane and
shoulder widths, improving sidewalk
connectivity, squaring up high speed
slip on and off-ramps from Katella
Avenue, providing dedicated rightturn lanes, and adding an optional exit lane on northbound I-605 offramp. The northbound on-ramp geometry is also being re-aligned to
make it more standard and provide
safer freeway entry speeds. This
project fosters improved mobility
for bicyclists and pedestrians and
enhanced operations for automobile
users on the state highway system.

Great Studebaker
Corridor Project
Long Beach, CA
Michael Baker teamed with LMI
on the Great Studebaker Corridor
Project. The City of Long Beach in
conjunction with community input,
City staff input, need for a safer
corridor, and funding provided by LA
Metro, has placed significant need
site rehabilitation along Studebaker
Road.The pavement evaluation
included determination of existing
strengths at 477 locations using
FWD technology and exploration of
the roadway cross section history at
32 locations through pavement core
sampling and field measurements.

The investigation is augmented
with Ground Penetrating Radar
thickness confirmation testing,
specific laboratory testing of the
underlying subgrade soil strengths
and moisture conditions obtained
during field boring operations.

The FWD data also provides
specific development of subgrade
strength (subgrade modulus) at the
corresponding locations along the
roadways.

Client: Orange
County
Transportation
Authority
(OCTA)
550 S. Main
St., Orange,
CA 92868
Contact:

Josue
Vaglienty
714-560-5852
jvaglienty@
octa.net
Completion
date: 2024
Project costs:
$3.9M
Team
Members:

Eric Spangler -
Project Manager
Randy Ratzlaff
- QA/QC
Engineer
Jeremy
Franzini -
Landscape
Architecture
Ben Costello -
Civil Associate
Client: City of
Long Beach
6335 Myrtle
Ave, Long
Beach, CA
90744
Contact:

Francis Matic
Michael
Baker Project
Manager
949-330-4132
Completion
date: 2022
Team
Members:

Steve Marvin
- Pavement
Engineer
▬ Caltrans Oversight and AAA
▬ Highway Design
▬ ADA Design
▬ Signal and Electrical Design
▬ Stage Construction/TMP
▬ Local Agency Coordination
▬ Utility Relocation
▬ Falling Weight
Deflectometer
▬ Ground Penetrating Radar
▬ Visual Evaluation
▬ Field Coring & boring sampling
▬ Laboratory analysis
▬ Pavement Evaluation
▬ Final Report

PROJECT RELEVANCE PROJECT RELEVANCE
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION 19 CITY OF TUSTIN | CIP NO. 70263

4. STANDARD FORM OF AGREEMENT EXCEPTIONS
Michael Baker has ongoing, previously negotiated contracts with the City of Tustin. We respectfully request that we continue using the previously negotiated terms and conditions of those previous contracts on this project. We are open to discussion and negotiation, if needed.

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

APPENDIX A

RESUMES
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-1 CITY OF TUSTIN | CIP NO. 70263
Eric is a seasoned transportation project manager with extensive experience leading roadway and multimodal improvement projects for Caltrans and local agency clients throughout California. He has managed project delivery through all phases, including project initiation, environmental clearance, plans, specifications and estimates, and construction support, while overseeing multidisciplinary teams, budgets, schedules, client coordination, and agency approvals. His background combines strong leadership, communication, and problem-solving skills with deep technical expertise, enabling him to deliver complex transportation projects efficiently and successfully.

RELEVANT EXPERIENCE
I-605 and Katella Interchange
Improvements Project, Los Alamitos,
California. Orange County Transportation
Authority (OCTA). PROJECT MANAGER.

Responsible for the PS&E phase of the
project. Oversaw all work efforts by the
Michael Baker disciplines and subconsultants.

Led the multi-agency PDT meetings and
was the main point of contact for the client
and Caltrans District 12, who provided
oversight. Michael Baker provided design and
engineering services for improvements to the
interchange at I-605 and Katella Avenue that
will promote a safer, smarter, and smoother
transportation system. Michael Baker has
provided survey for the Project Approval
and Environmental Documentation and the
PS&E phases of this project under California
Department of Transportation District 12
oversight for widening Katella Avenue to
provide standard land and shoulder and bike
lane widths, improving bike lane and sidewalk
connectivity, eliminating unconventional
lane drops, providing dedicated right-turn
lanes, and adding an optional exit lane to the
northbound off-ramp to westbound Katella
Avenue and Willow Street.

Hermosa Avenue Pavement Resurfacing
& Streetscape Improvements, Hermosa
Beach, California. City of Hermosa Beach.

PROJECT MANAGER. Responsible for
project management of this fast-track and
marquis project for the City of Hermosa
Beach. Michael Baker prepared the PS&E
for a high-profile, fast-track pavement
resurfacing and streetscape project for
the city of Hermosa Beach. Due to a tight
funding deadline, it completed the design
quickly, while providing a high-quality PS&E.

The project involved practical and aesthetic
upgrades and improvements to re-brand
the Hermosa Avenue main beachfront
thoroughfare and create a sense of arrival
in the downtown area. It included pavement
rehabilitation, the upgrade of 46 curb ramps
to ADA standards, new bulb-out curb returns,
transit stop upgrades, and decorative
DecoMark and DuraTherm pavement designs.

S.R. 22 at Studebaker Interchange Project,
Long Beach, California. City of Long Beach.

TEAM MEMBER. Assisted team members
with Caltrans coordination on this project.

Michael Baker provided engineering services
to prepare environmental documentation and
preliminary engineering (PA/ED) needed to
obtain Caltrans District 7 approval for the PA/
ED phase of this project. The purpose of the
project was to mitigate traffic impacts to S.R.
22 entrance and exit ramps at Studebaker
Road that were occurring from the I-405
Express Lanes project. For the project,
Michael Baker provided state right-of-way
along the original alignment of the entrance
and exit ramps to Long Beach, significant
utility relocations, sounds walls, drainage and
water quality,ADA curb ramps and sidewalk,
and California Environmental Quality Act
documentation processing to clear the project
environmentally.

S.R. 91 Westbound Widening from
Shoemaker to I-605, Los Angeles County,
California. Los Angeles County Metropolitan
Transportation Authority. PROJECT
MANAGER. Responsible for managing
design and production of project deliverables,
managing the work of subconsultants, and
coordinating directly with the client (LA
Metro), Caltrans, and other public agencies.

Michael Baker prepared the project approval/
environmental document and plans,
specifications, and estimates for widening
Westbound S.R. 91 for approximately 3
miles from Shoemaker Avenue to the I-605
interchange, and on Northbound I-605 from
S.R. 91 to Alondra Boulevard.

ERIC SPANGLER, PE, TE | PROJECT MANAGER

EDUCATION
B.S., 1999, Civil
Engineering,
California State
Polytechnic
University, San Luis
Obispo

LICENSES
Professional
Engineer - Civil,
California, 2003,
C64948
Professional
Engineer - Traffic,
California, 2005,
TR2411

YEARS WITH

MICHAEL BAKER
10 YEARS

EXPERIENCE
26 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-2 CITY OF TUSTIN | CIP NO. 70263
David is an experienced project manager with a strong background leading multidisciplinary civil infrastructure assignments from planning and design through permitting and construction support. He is skilled in coordinating with clients, agency staff, and consultant teams, managing project scope, budgets, schedules, and approvals, and guiding projects through complex review processes. His experience includes proactively addressing project risks, aligning technical teams around delivery goals, and maintaining clear communication to support efficient, collaborative, and high-quality outcomes for land development and public infrastructure projects

RELEVANT EXPERIENCE
Cow Camp Road Extension. Rancho
Mission Viejo, California. PROJECT
MANAGER. Responsibilities included
overseeing the design for Phases 2C-1 and
2C-2 of the Cow Camp Road Extension.

This included coordination with the Client,
the Client’s consultant design team,
and Orange County for design changes
and processing the plan for approval.

Responsibilities also included construction
support services for Phases 2A and 2B.

Tustin Legacy Neighborhood D South
Infrastructure Improvements. City of Tustin.

PROJECT MANAGER. Responsibilities
included overseeing the design, PS&E
package, and construction support for the
sanitary sewer, domestic water, recycled
water, storm drain, street, traffic signal, and
landscaping improvement plans associated
with the construction of the backbone
streets for Neighborhood D South Phase 2.

Responsibilities also included overseeing
the rough grading design for future lots,
Armstrong Pedestrian Bridge, and Phase 3 of
Tustin Legacy Park. Additional responsibilities
included coordination with the City of Tustin,
IRWD, and the City’s consultants associated
with neighboring projects.

Baker Ranch - Phase 2 & 3. Shea Homes
LP, So Cal Div. PROJECT MANAGER.

Responsibilities included the management
and preparation of precise grading plans for
four community parks and two recreation
centers on the Baker Ranch Development.

Coordinated with the client, applicable
agencies, and other consultants during design
and construction and prepared rough grading,
precise grading, street, storm drain, sewer,
and water improvement plans for the project.

Also prepared site plans and tentative maps
during the entitlement process. Baker Ranch
is a 372-acre Master Planned Community
with 2,379 residential units, nine HOA parks,
one public park, open space, trail system, and
three private recreation centers.

District at South Bay, Carson, CA.

RE Solutions/Carson Reclamation
Authority. PROJECT MANAGER. David’s
responsibilities included overseeing the
preparation of rough grading, domestic water,
sanitary sewer, recycled water, and street
improvement plans for a 157-acre site that is
a former landfill. He processed plans through
Los Angeles County Department of Public
Works (LACDPW), California Water Service,
and West Basin Municipal Water District and
coordinated with agency staff towards plan
approvals.

Planning Area 39 Backbone Infrastructure
Improvements, Irvine, California. Irvine
Company. PROJECT ENGINEER. David’s
responsibilities included construction support
and the preparation of demolition, mass
grading, sewer, water, storm drain, retaining
wall, and street improvement plans. Additional
responsibilities include earthwork, hydrology
and hydraulics calculations. The project
included the demolition of the Wild Rivers
Water Park and Lion Country Safari site
and provided backbone infrastructure for a
future apartment site. In addition, this project
provided a NTS Basin, regional bike trail, and
embankment protection along the edge of San
Diego Creek.

DAVID HOOPFER, PE, LEEP AP | DEPUTY PROJECT MANAGER

EDUCATION
B.S., 2005, Civil
Engineering,
California State
Polytechnic
University, San Luis
Obispo

LICENSES
Professional
Engineer - Civil,
California, 2008,
73154
LEED Accredited
Professional

YEARS WITH

MICHAEL BAKER
22 YEARS

EXPERIENCE
22 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-3 CITY OF TUSTIN | CIP NO. 70263
Randy brings more than 33 years of civil engineering experience with a strong emphasis on quality control for transportation and public works projects delivered to Caltrans standards. He has extensive experience performing independent QA/QC reviews of plans, specifications, estimates, and technical documents, helping project teams improve accuracy, maintain consistency, and confirm compliance with agency criteria and project requirements. His background includes roadway geometrics, roadway rehabilitation, utility coordination, specification writing, and design oversight, allowing him to identify issues early and support the delivery of complete, constructible PS&E packages.

RELEVANT EXPERIENCE
I-605 and Katella Interchange
Improvements Project, Los Alamitos,
California. Orange County Transportation
Authority (OCTA). QA/QC ENGINEER.

Responsibilities include being the project’s
Quality Assurance Manager, making sure the
project deliverables are following the project
QA/QC plan and writing the Supplemental
Design Standard Decision Document for the
project design standard deviations. Michael
Baker provided design and engineering
services for improvements to the interchange
at I-605 and Katella Avenue that will promote
a promote a safer, smarter, and smoother
transportation system. Michael Baker has
provided survey for the Project Approval
and Environmental Documentation and the
plans, specifications, and estimates phases
of this project under California Department
of Transportation District 12 oversight for
widening Katella Avenue to provide standard
land and shoulder and bike lane widths,
improving bike lane and sidewalk connectivity,
eliminating unconventional lane drops,
providing dedicated right-turn lanes.

I-405 South Multi-Asset Design-Build,
Irvine, California. Caltrans. SENIOR
CIVIL ENGINEER/QUALITY CONTROL.

Responsibilities include providing independent
quality review of plans and serving as the
project specification writer. In partnership
with the contractor, Michael Baker is the lead
designer for the I-405 Multi-Asset DesignBuild Project, which is the first designbuild project for California Department of Transportation District 12. The project is
located within the cities of Irvine and Costa
Mesa in Orange County. The project limits
extend on I-405 for approximately 11.2
miles between I-5 and Harbor Boulevard.

The project involves improvements to the
pavement on mainline and ramps, roadside
safety, transportation management systems,
a new park and ride facility at the Bristol
Street interchange, and rehabilitation of
lighting and roadside items along the I-405
corridor.

Studebaker and S.R. 22 Realignment,
Long Beach, California. City of Long Beach.

SENIOR ENGINEER. Responsible for
providing senior level insite and independent
quality review of project documents and
plans. Michael Baker is responsible for
preparing the Environmental Documentation
and Preliminary Engineering (PA/ED)
necessary to secure California Department of
Transportation (Caltrans) District 7 approval
for the PA/ED phase of the Studebaker and
S.R. 22 Interchange project. Concurrently,
Michael Baker is developing the plans,
specifications, and estimate for Caltrans
District 7 approval. The project’s purpose
is to mitigate traffic impacts on the S.R. 22
entrance and exit ramps at Studebaker,
caused by the Interstate 405 Express Lanes
project.

Pavement Resurfacing, La Sierra Avenue,
Riverside, California. Riverside County.

SENIOR ENGINEER. Developed technical
specifications and performed QC review of
plans and estimate. Michael Baker provided
design services for the improvement and
repair of La Sierra Avenue’s pavement. The
project included completing field reviews to
identify damaged areas in need of repair and
upgrades, identifying impacted utilities for
necessary relocation and adjustment, and
preparing plans, specifications, and estimates.

Additionally, Michael Baker reconstructed AC
Dike, upgraded metal beam guard railing,
roadside signs, pavement markings, and
reconstructed curb ramps to meet Americans
with Disabilities Act (ADA) requirements.

RANDY RATZLAFF, PE | QUALITY CONTROL MANAGER

EDUCATION
M.S., 1998,
Structural
Engineering,
California State
University at
Fullerton
B.S., 1993, Civil
Engineering

LICENSES
Professional
Engineer - Civil,
California, 1997,
C56867

YEARS WITH

MICHAEL BAKER
29 YEARS

EXPERIENCE
33 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-4 CITY OF TUSTIN | CIP NO. 70263
Ben is a roadway design engineer with experience supporting the preparation of plans, specifications, and estimates for highway, interchange, and public-sector transportation improvement projects throughout Southern California. His background includes roadway geometry, profiles, superelevation, curb ramp design, traffic safety systems, and roadway calculations for Caltrans, county transportation departments, and other local agency clients. He is proficient in MicroStation, InRoads, and OpenRoads and has contributed to major corridor, freeway, and interchange improvements from preliminary design through PS&E development.

RELEVANT EXPERIENCE
Interstate 10 and Jefferson Street
Interchange, Indio, California. Riverside
County Transportation Department. CIVIL
ENGINEER. Responsible for leading the
roadway design and preparation of plans
for the 65% PS&E package. Michael Baker
served as the lead designer for the Interstate
10 (I-10) and Jefferson Street Interchange
project in providing two parallel 78-footwide by 440-foot-long bridges that created a six-lane overcrossing accommodating
traffic entering and exiting the I-10 freeway
from both directions. The new overcrossing
also included dedicated turning lanes and
shoulders wide enough for a bicycle lane and
a sidewalk for northbound pedestrians. Five
entrance and exit ramps were constructed
along with one spread footing and four
mechanically stabilized earth retaining walls.

I-15 Corridor Freight and Express
Lanes PS&E Project, San Bernardino
and Riverside Counties, California.

San Bernardino Associated Governments
(SANBAG). CIVIL ASSOCIATE. Responsible
for working on the I-15 Corridor Freight and
Express Lanes as a design engineering
technician. Worked with the Roadway team
to develop Roadway Plans for 65% PS&E
including Layout, Profile & Superelevation,
and Construction Detail sheets. Currently
working on the Roadway plans for 95%
PS&E. Developed Length of Need (LON)
Calculations for 65% submittal to Caltrans.

Michael Baker is currently serving as lead
designer on the Interstate 15 Corridor
Express Lanes design-bid-build project to
reduce traffic congestion, increase throughput
and enhance regional mobility. As lead
designer, Michael Baker is responsible for
managing the overall design process, which
includes ensuring that the design meets the
schedule and established design criteria,
as well as interfacing with the major project
stakeholders, California Department of
Transportation (Caltrans), Riverside County
Transportation Commission (RCTC), and
various rail authorities to integrate design and
construction.

I-405 South Multi-Asset Design-Build,
Irvine, California. Caltrans. CIVIL
ENGINEER. Responsible for three out of
five segments of the project. Responsible
for the design of all curb ramps and traffic
safety systems in those segments, and
supported roadway modeling and design
for the project. Led preparation of the
Roadway Plans, Length of Need Calculations,
Supplemental Design Standard Decision
Document, Traffic Safety System Exceptions,
and Roadway Calculations. Led task force
meetings, comment resolution, and comment
verification meetings. Also led inter-discipline
coordination, as well as coordination within
the roadway team. Performed quality control
and coordination with subconsultants
performing roadway design for the other two
segments of this project. In partnership with
the contractor, Michael Baker is the lead
designer for the I-405 Multi-Asset DesignBuild Project, which is the first designbuild project for California Department of Transportation District 12. The project is
located within the cities of Irvine and Costa
Mesa in Orange County. The project limits
extend on I-405 for approximately 11.2
miles between I-5 and Harbor Boulevard.

The project involves improvements to the
pavement on mainline and ramps, roadside
safety, transportation management systems, a
new park and ride facility at the Bristol Street
interchange, and rehabilitation of lighting and
roadside items along the I-405 corridor.

BEN COSTELLO, PE | ROADWAY DESIGN

EDUCATION
B.S., 2021, Civil
Engineering,
California State
Polytechnic
University, Pomona

LICENSES
Professional
Engineer, California,
2024, 96768
Part 107 sUAS
Remote Pilot
Certificate,
California, 2019,
4246241

YEARS WITH

MICHAEL BAKER
4 YEARS

EXPERIENCE
6 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-5 CITY OF TUSTIN | CIP NO. 70263
Rick is a civil engineer with 24 years of experience delivering roadway and municipal infrastructure design for public agency clients throughout Southern California. His background includes preparation of preliminary and final engineering plans for street improvements, grading, drainage, storm drain, sewer, and water systems, as well as technical documentation such as hydrology and hydraulic reports, cost estimates, and engineering calculations. He has supported municipal projects for agencies including the cities of Tustin, Carson, and Huntington Beach, with experience in roadway corridors, bridge-related improvements, channel access improvements, parking and circulation analysis, and construction support.

RELEVANT EXPERIENCE
El Camino Real and Tustin Ranch
Road Street Improvements Categorical
Exemption, Tustin, California. City of Tustin.

PROJECT ENGINEER. Responsibilities
included water and street improvement plan
development, and construction support.

Michael Baker assisted the client with the
preparation of a Notice of Exemption (NOE)
for the El Camino Real and Tustin Ranch
Road Street Improvements project. The NOE
included a project description, a finding that
the project is exempt from CEQA, and a
statement of reasons to support the findings.

S.R. 91 Westbound Widening from
Shoemaker to I-605, Los Angeles County,
California. Los Angeles County Metropolitan
Transportation Authority. PROJECT
ENGINEER. Responsibilities included
conceptual grading support. Michael Baker
prepared the project approval/environmental
document and plans, specifications, and
estimates for widening Westbound S.R. 91
for approximately 3 miles from Shoemaker
Avenue to the I-605 interchange, and on
Northbound I-605 from S.R. 91 to Alondra
Boulevard. The project involved interchange
reconfiguration of Pioneer Boulevard and
Norwalk Boulevard interchanges, right-ofway acquisition, drainage improvements, intersection control evaluation screening,
utility impacts evaluation, and local street and
Americans with Disabilities Act improvements.

Irvine Apartment Community Project,
Planning Area 39, Irvine, California.

Irvine Community Development Company.

PROJECT ENGINEER. Responsibilities
included street improvement plan
development. Michael Baker prepared grading
and infrastructure plans for Phase I of the
Irvine Apartment Community Project, Planning
Area 39. The project provided approximately
1,750 apartment units with parks and trails to
serve the community. The project included the
demolition of the Old Lion Country Safari, Wild
Rivers, and Camp James and the preparation
of plans to obtain preliminary grading permits,
San Diego Creek embankment protection
permits, street and wet utility improvements,
NTS basin precise grading permits, and a final
map for the Phase I area of Planning Area

39. The contract involved many disciplines,
including land development, mapping and
surveying, surface water, transportation, water
resources, and structures
Moffett Drive Bridge Engineering, Tustin,
California. City of Tustin. PROJECT
ENGINEER. Responsibilities included water
and street improvement plan development,
and construction support. Michael Baker
provided engineering services for the Moffett
Bridge over Peter’s Canyon Channel.

The steel arch included high performance
steel, pre-tensioned vertical tie rods, built
up steel tie girders, slender steel box ribs,
HSS truss lateral braces and both pot and
restrained bearings. Special detailing was
also required for the knuckles and conceptual
staging details. The arch is supported on the
abutments of the 108-foot-long single-span,
cast-in-place post-tensioned concrete box
girder bridge below.

RICK HOWE, PE | ROADWAY DESIGN

EDUCATION
B.S., 2001, Civil
Engineering,
California State
University at Long
Beach

LICENSES
Professional
Engineer - Civil,
California, 2005,
70735

YEARS WITH

MICHAEL BAKER
24 YEARS

EXPERIENCE
24 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-6 CITY OF TUSTIN | CIP NO. 70263
As a technical specialist in the Transportation and Public Works Department, Brian brings extensive experience preparing plans, specifications, and estimates for roadway and public works projects. His work emphasizes developing special provisions, coordinating technical inputs across disciplines, managing submittal packages, and supporting QA/QC to deliver clear, biddable, and constructible contract documents. He has contributed to a wide range of rehabilitation, widening, intersection, ADA, and complete streets projects, helping agencies advance PS&E packages through design development, utility coordination, and final delivery.

RELEVANT EXPERIENCE
Cow Camp Road Extension, Rancho
Mission Viejo, California. Rancho Mission
Viejo, LLC. TECHNICAL SPECIALIST.

Responsibilities included coordinating
the project information between the
transportation, stormwater, traffic, and
structural departments. Also responsible
for coordinating the milestone submittal
documents and keeping the team on
schedule. Michael Baker is providing design
services for the nearly five-mile long Cow
Camp Road Project. When complete,
this project will have taken more than 10
years to design and cost more than $125
million to construct. The project serves
as the backbone infrastructure for the
Rancho Mission Viejo Development that
will eventually include more than 14,000
homes and five million square feet of
retail and commercial space. Included
in this significant project are nearly five
miles of arterial roadway, more than 10
intersecting local streets, bridges over
Chiquita Canyon, Gobernadora Canyon,
and San Juan Creek, and an interface with
Caltrans at Ortega Highway that requires
an Intersection Control Evaluation. The
project includes significant water and sewer
facilities, local and regional stormwater
control, water quality systems and basins,
and extensive coordination with several
permitting agencies.
4th Street Roadway Rehabilitation, Long
Beach, California. City of Long Beach.

DESIGNER. Responsible for developing
project set-up, horizontal and vertical
design of the roadway, and plans and
estimate. Michael Baker provided final
engineering services for complete street
and roadway rehabilitations including ADA
upgrades for the segment of 4th Street in
Long Beach, California, between Cerritos
Avenue and Almond Avenue. The project
addressed non-compliant ADA facilities,
drainage issues, curb and cross gutter
geometry issues, pavement failures, and
bus and transit upgrades. Some of the
challenges the team overcame on this
project included steep driveways, pavement
design, coordination with multiple agencies,
improving roadway profile, and ADA
compliance.

Roadway Rehabilitation, Ximeno Avenue,
Long Beach, California. City of Long Beach.

DESIGNER. Responsible for developing
project set-up, horizontal and vertical design
of the roadway, and the plans and estimate.

Michael Baker provided final engineering
services for complete street and roadway
rehabilitations including ADA upgrades for
the segment of Ximeno Avenue between
15th Street and the Pacific Coast Highway.

The project addressed non-compliant ADA
facilities, drainage issues, curb and cross
gutter geometry issues, pavement failures,
and bus and transit upgrades. Some of
the challenges that the team overcame
on this project included steep driveways,
pavement design, coordination with multiple
agencies, improving roadway profile, and
ADA compliance.

San Antonio Drive Improvement Project,
Long Beach, California. City of Long Beach.

DESIGNER. Responsible for developing
project set-up, horizontal and vertical
design of the roadway, and the plans
and estimate. Michael Baker provided
design and engineering services for the
City of Long Beach to prepare plans,
specifications, and estimates and provide
bid and construction support services
for improvements to San Antonio Drive
between Long Beach Boulevard and
Atlantic Avenue.

BRIAN FUJIMOTO, EIT | SPECIFICATIONS

EDUCATION
B.S., 1998, Civil
Engineering,
California State
University at Long
Beach

LICENSES
Engineer-In-Training,
California, 1998,
XE104363

YEARS WITH

MICHAEL BAKER
28 YEARS

EXPERIENCE
28 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-7 CITY OF TUSTIN | CIP NO. 70263
Kim brings more than two decades of signal systems leadership, corridor operations expertise, and hands on implementation experience. He specializes in traffic signal design and operations, multimodal safety, ITS and fiber optic communications, and corridor timing— ranging from LPI development to controller conversions and complex coordination strategies.

Kim has delivered high profile work within both Caltrans and local agency frameworks, preparing signing/striping, traffic control, and PS&E packages, as well as completing forecasting, impact studies, and multimodal evaluations.

RELEVANT EXPERIENCE
Orangewood Avenue Improvements
Project, Anaheim, California. City
of Anaheim. TRAFFIC ENGINEER.

Responsible for providing QC and project
management oversight for the development
of the traffic control plans and pavement
delineation plans. Michael Baker is
assisting the City of Anaheim with civil,
structural, and environmental engineering
services to improve Orangewood Avenue
in the cities of Anaheim and Orange as
part of the Revised Platinum Triangle
Expansion Project. The project would
widen a portion of Orangewood Avenue
from a five-lane roadway to a six-lane
divided facility with medians and utility
infrastructure improvements consistent with
the Platinum Triangle minimum widening
standards. As part of the project, Michael
Baker is preparing an Addendum to the
Final Subsequent Environmental Impact
Report No. 339 as well as providing agency
coordination, bridge inspection, and
structural PS&E to widen the Orangewood
Avenue Bridge.

Safety Enhancements Study for Santa
Monica Boulevard, Santa Monica,
California. City of Santa Monica. TRAFFIC
TASK MANAGER/ENGINEER. Responsible
for providing technical support through
preparing the traffic signal timing plans.

Michael Baker conducted a safety
enhancements study to develop innovative
solutions aimed at improving safety,
accessibility, and mobility along a 2.4-mile
stretch of Santa Monica Boulevard. The
study focused on reducing severe and fatal
collisions and incorporated community input
as part of the Santa Monica Boulevard
Safety Enhancement project. Key potential
solutions included enhanced crosswalks,
protected bikeways, improved transit stops,
and smart street technology applications.

The project aligned with Santa Monica’s
Vision Zero Action Plan and involved
extensive public outreach to ensure
community support and input.

T-Intersection Standardization, Irvine,
California. City of Irvine. TRAFFIC TASK
MANAGER/ENGINEER. Provided QC and
review of the traffic report. Michael Baker is
providing planning and engineering services
for the development of design standards
and guidelines pertaining to signalized
intersections with three approaches
(T-intersections). The city currently has
78 signalized T-intersections, rather than
the typical four approaches seen at most
intersections. These locations all feature
various infrastructure, equipment, signage,
and even geometries. With this project,
the city hopes to establish standards
and guidelines to create uniformity that
can be implemented and maintained
at existing T-intersections and before
proposed T-intersections are designed and
constructed.

Studebaker Road Complete Streets
Project, Long Beach, California. City of
Long Beach. TRAFFIC TASK MANAGER/
ENGINEER. Responsible for providing
QC and project managing oversight for the
preparation and approval of the pavement
delineation plan along with the signal
improvement plans. Michael Baker’s work
on the Studebaker Road Complete Streets
Project included obtaining California
Department of Transportation (Caltrans)
approval, transit facility location and
coordination, public outreach, innovative
pavement design, coordination with multiple
agencies, improving the roadway profile,
and ADA compliance.

KIM PREAP, PE, TE | TRAFFIC ENGINEERING

EDUCATION
B.S., 2003, Civil
Engineering
(Transportation
Systems), University
of California, Irvine

LICENSES
Traffic Engineer,
California, 2014,
2833

YEARS WITH

MICHAEL BAKER
1 YEARS

EXPERIENCE
24 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-8 CITY OF TUSTIN | CIP NO. 70263
Saeed is a traffic engineer with 18 years of experience delivering municipal transportation improvements for cities and public agencies. His expertise includes traffic signal design, signal timing and operations, intersection improvements, signing and striping, traffic control plans, ADA curb ramp improvements, and Plans, Specifications, and Estimates (PS&E) development for complete streets and corridor projects. He has supported municipalities throughout project planning, design, and implementation by preparing technically sound, agency-compliant deliverables aligned with AASHTO, HDM, Greenbook, NACTO, CMUTCD, and local public works standards. His experience coordinating with city staff and multidisciplinary teams helps agencies advance projects that improve safety, mobility, accessibility, and operational efficiency.

RELEVANT EXPERIENCE
Studebaker Road Complete Streets
Project, Long Beach, California. City of
Long Beach. TECHNICAL MANAGER.

Responsibilities included the development
of a comprehensive plan sheet set for
traffic-related components of the PS&E
package. Oversaw the creation of a
revised signal modification plan, along
with detailed signing and striping plans,
ensuring alignment with project objectives
and regulatory standards. Coordinated with
engineering teams to produce accurate,
high-quality deliverables, enhancing traffic
flow and safety while meeting deadlines
and client expectations. Michael Baker’s
work on the Studebaker Road Complete
Streets Project included obtaining Caltrans
approval, transit facility location and
coordination, public outreach, innovative
pavement design, coordination with multiple
agencies, improving the roadway profile,
and ADA compliance. Studebaker Road
is the eastern most north-south arterial
corridor beginning at 2nd Street and ending
at the Los Coyotes Diagonal. The length of
the project was approximately 5 miles long
and included 17 signalized intersections.

The project converted Studebaker Road to
a complete street corridor by adding cycle
tracks, including on-street bicycle lanes
separated from through traffic by parallel
parking and a buffered area as well as sideboarding island transit stops.

Walnut Street Corridor Signal
Improvements Project, Pasadena,
California. City of Pasadena. TECHNICAL
MANAGER. Led the team in designing
curb ramps for nine intersections, ensuring
full compliance with the Standard Plans
for Public Works Construction (SPPWC,
Greenbook). Oversaw plan preparation,
quality assurance, and regulatory
adherence while coordinating with project
teams to integrate designs seamlessly
into existing infrastructure. Michael Baker
performed PS&E work on the Walnut Street
Corridor Signal Improvements Project
funded by local Los Angeles Metro Measure
R funding. The Walnut Street Corridor
Signal Improvements Project consisted of
two main project corridors and an additional
intersection. As part of the team’s scope
of work, Michael Baker completed the
PS&E design for the traffic signals, fiber
optic, intelligent transportation system, and
Americans with Disabilities Act curb ramps,
which also included performing topographic
survey.

T-Intersection Standardization, Irvine,
California. City of Irvine. TECHNICAL
MANAGER. Directed the creation of
design standards and guidelines for
signalized T-intersections with three
approaches. Established comprehensive
frameworks to ensure consistency, safety,
and operational efficiency in traffic signal
designs. Additionally, authored a detailed
technical memorandum outlining the
development process, from concept to
finalization, culminating in successful
approval by the City. Michael Baker is
providing planning and engineering services
for the development of design standards
and guidelines pertaining to signalized
intersections with three approaches
(T-intersections). The city currently has
78 signalized T-intersections, rather than
the typical four approaches seen at most
intersections. These locations all feature
various infrastructure, equipment, signage,
and even geometries. With this project,
the city hopes to establish standards
and guidelines to create uniformity that
can be implemented and maintained
at existing T-intersections and before
proposed T-intersections are designed and
constructed.

SAEED KERAYEHCHIAN, PE, PTOE | TRAFFIC ENGINEERING

EDUCATION
M.S.E., 2008,
Transportation
Engineering, Azad
University, Iran
B.S.E., 2005, Civil
Engineering, Azad
University, Iran

LICENSES
Professional Traffic
Operations Engineer,
California, 2019,
4710
Professional
Engineer - Civil,
California, 2018,
89422

YEARS WITH

MICHAEL BAKER
3 YEARS

EXPERIENCE
18 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ENGINEERING DESIGN SERVICES FOR JAMBOREE ROAD REHABILITATION A1-9 CITY OF TUSTIN | CIP NO. 70263
John brings more than twelve years of experience in pavement engineering and materials.

He served at LMI from 2007 to 2019 — working with asphalt materials, materials testing, and investigation of existing pavement systems — and returned in 2024 after obtaining his California Professional Engineer license. As Project Engineer,John is responsible for materials and forensic investigation reports, including oversight of field and laboratory test data, preparation of technical reports, and design recommendations. He also oversees quality control for laboratory and inspection work performed by LMI operations.

RELEVANT EXPERIENCE
I-405 Widening, Orange County,
California. OCTA/Mott Macdonald.

PAVEMENT ENGINEER. LaBelle
Marvin, Inc., was contracted to perform
a pre-impact structural investigation
study of the select roadways through,
adjacent to and surrounding the four
individual cities of Costa Mesa, Huntington
Beach, Westminster and Fullerton. The
purpose of our study was to determine
the potential impacts on short- and longterm pavement performance utilizing a combination of current measured pavement
strengths, observed pavement conditions,
documented pavement section thicknesses
and computer modeling of the traffic
changes on pavement performance.

Laguna Beach “Zone 3” Structural
Pavement Investigation, Laguna
Beach, California. City of Laguna Beach.

PAVEMENT ENGINEER. The City of
Laguna Beach had identified various
downtown city streets, within Zone 3, of
needed pavement analysis, testing and
design services for scheduled rehabilitation
of Glenneyre Street, Park Avenue and
Thalia Street in the near future. The City
had authorized LMI to perform a thorough
structural investigation of the roadways
to determine specific needs and explore
rehabilitation alternatives for the City’s
design team use.

Great Studebaker Corridor ProjectLong
Beach, California. City of Long Beach.

PAVEMENT ENGINEER. The City had
identified the need for rehabilitation of
Studebaker Road, a four lane arterial
roadway extending from 2nd Street to Los
Coyotes Diagonal Camino, as part of the
Great Studebaker Corridor Improvement
Project. The City, C/O Micheal Baker
International had authorized LMI to perform
a thorough structural investigation of the
roadway to determine specific needs and
explore rehabilitation alternatives.

Camino De Los Mares, San Clemente,
California. City of San Clemente.

PAVEMENT ENGINEER. The City had
identified the need for rehabilitation of
Camino de Los Mares, at the I-5 Freeway.

The City had authorized LMI to perform
a thorough structural investigation of the
roadway to determine specific needs and
explore rehabilitation alternatives.

Cameo Highlands Residential, Newport
Beach, California. City of Newport Beach.

PAVEMENT ENGINEER. The City of
Newport Beach, California had identified
the need for rehabilitation of the upscale
residential neighborhood of Cameo
Highlands. The City had authorized LMI to
perform a thorough structural investigation
of the roadway to determine specific needs
and explore rehabilitation alternatives.

JOHN WARRICK, PE | PAVEMENT DESIGN

EDUCATION
BSCE – California
State University,
Fullerton

LICENSES
Professional Civil
Engineer No. 96293

YEARS WITH
LMI
15 YEARS

EXPERIENCE
20 Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC 13 EXHIBIT “C”
CONSULTANT’S FEE PROPOSAL
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC City of Tustin
Engineering Design Services for Jamboree Road Rehabilitation Fee Proposal - June 1, 2026
Classifications Senior Project Manager Deputy Project Manager Senior Technical Manager Senior Technical Specialist Senior Project Engineer/ QA/QC Manager Senior Environmental Specialist Senior Design Engineer Design Engineer Associate Design Engineer/Designer Senior CAD Technician/Assistant Engineer Civil Associate II Senior Landscape Architect Landscape Architect Landscape Designer Project Administration Task No. Task Description $410.00 $320.00 $360.00 $265.00 $250.00 $240.00 $200.00 $175.00 $160.00 $150.00 $140.00 $280.00 $200.00 $135.00 $125.00 Hours Fee

1.0 PROJECT MANAGEMENT, COORDINATION & MEETINGS 57 150 23 5 9 2 246 $83,120.00 246 $83,120.001.1 Attend Kick-Off Meeting 3 3 3 3 3 15 $4,710.00 15 $4,710.001.2 Monthly Progress Meetings 20 60 20 100 $34,600.00 100 $34,600.001.3 Project Coordination and Management (15 Months) 30 75 2 6 2 115 $38,330.00 115 $38,330.001.4 Right of Way Certification Management 8 8 $2,560.00 8 $2,560.00

1.5 Public Meeting 4 4 8 $2,920.00 8 $2,920.002.0 FIELD VISIT AND SITE ASSESSMENT 8 8 8 8 32 $8,320.00 32 $8,320.00

2.1 Field Visit and Site Assessment 8 8 8 8 32 $8,320.00 32 $8,320.00

3.0 RESEARCH AND REVIEW OF AVAILABLE DATA 4 8 24 8 44 $7,920.00 44 $7,920.00

3.1 Research and Review of Available Data 4 8 24 8 44 $7,920.00 44 $7,920.00

4.0 STRUCTURAL PAVEMENT INVESTIGATION AND DESIGN ALTERNATIVES AND REPORT 12 8 12 4 36 $8,260.00 $65,680.00 36 $73,940.00

4.1 Structural Pavement Investigation with Design Alternatives and Report 12 8 12 4 36 $8,260.00 $65,680.00 36 $73,940.005.0 WATER QUALITY MANAGEMENT 5 14 85 104 $20,175.00 104 $20,175.005.1 Draft Water Quality Management Plan (WQMP) 2 7 54 63 $11,920.00 63 $11,920.005.2 Final Water Quality Management Plan (WQMP) 3 7 31 41 $8,255.00 41 $8,255.006.0 GAD EXHIBITS FOR BIKE LANE IMPROVEMENTS 2 4 2 8 20 20 56 $10,420.00 56 $10,420.00

6.1 GAD Exhibits for Bike Lane Improvements 2 4 2 8 20 20 56 $10,420.00 56 $10,420.00 7 PRELIMINARY ENGINEERING (30% DESIGN) 4 16 2 9 16 14 41 68 33 4 8 26 241 $43,125.00 241 $43,125.00

7.1 Prepare Plans 4 12 2 16 12 32 68 24 4 8 26 208 $36,410.00 208 $36,410.007.2 Prepare Specs 2 9 11 $3,025.00 11 $3,025.007.3 Prepare Cost Estimate 2 2 9 9 22 $3,690.00 22 $3,690.00 7B NEPA SUPPORT SERVICES 1 2 30 10 43 $10,000.00 43 $10,000.00 7B.1 NEPA Support Services 1 2 30 10 43 $10,000.00 43 $10,000.00 8 INTERMEDIATE ENGINEERING (60% DESIGN) 4 18 24 10 20 40 106 83 48 98 7 34 28 520 $96,980.00 520 $96,980.00

8.1 Prepare Plans 4 12 22 16 40 70 55 48 80 4 26 24 401 $74,410.00 401 $74,410.008.2 Prepare Specs 4 1 10 4 30 10 2 6 67 $13,900.00 67 $13,900.008.3 Prepare Cost Estimate 2 1 6 18 18 1 2 4 52 $8,670.00 52 $8,670.00 9 FINAL PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) 8 34 32 18 12 50 34 76 48 100 2 10 12 436 $86,940.00 436 $86,940.00

9.1 Prepare Plans (90%) 4 12 22 8 40 32 44 34 48 1 8 8 261 $50,820.00 261 $50,820.009.2 Prepare Specs (90%) 2 1 9 4 16 $4,385.00 16 $4,385.00

9.3 Prepare Cost Estimate (90%) 3 1 2 8 18 1 2 4 39 $6,690.00 39 $6,690.009.4 Prepare Plans (100%) 4 12 7 10 16 14 16 79 $16,900.00 79 $16,900.00

9.5 Prepare Specs (100%) 2 9 11 $3,025.00 11 $3,025.009.6 Prepare Cost Estimate (100%) 3 1 8 18 30 $5,120.00 30 $5,120.00 10 CALTRANS ENCROACHMENT PERMIT PROCESSING 10 20 10 20 20 60 140 $31,200.00 140 $31,200.00

10.1 Caltrans Encroachment Permit Processing 10 20 10 20 20 60 140 $31,200.00 140 $31,200.00

11.0 BID SUPPORT 16 30 46 $9,920.00 46 $9,920.0011.1 Bid Support (attend up to 3 meetings and address up to 10 RFI's) 16 30 46 $9,920.00 46 $9,920.0012.0 CONSTRUCTION SUPPORT 3 56 30 108 217 $46,730.00 217 $46,730.00

12.1 Shop Drawing Review (20 submittals) 10 20 40 20 90 $17,400.00 90 $17,400.0012.2 Construction Plan Interpretation (up to 10 RFI's) 10 10 40 60 $12,100.00 60 $12,100.0012.3 Construction Meetings and Observation (Pre-Construction plus 6 monthly meetings) 3 28 28 59 $14,670.00 59 $14,670.00

12.4 Punch List, Approval and Closeout 8 8 $2,560.00 8 $2,560.0013.0 RECORD DRAWINGS 8 20 8 20 4 4 64 $11,100.00 64 $11,100.00

13.1 Record Drawings 8 20 8 20 4 4 64 $11,100.00 64 $11,100.00 89 348 106 37 84 30 142 277 482 200 271 18 65 72 4 2,225 $474,210.00 $65,680.00 2,225 $539,890.00 $1,500.00
$36,490.00 $111,360.00 $38,160.00 $9,805.00 $21,000.00 $7,200.00 $28,400.00 $48,475.00 $77,120.00 $30,000.00 $37,940.00 $5,040.00 $13,000.00 $9,720.00 $500.00 $474,210.00 $65,680.00 $541,390.00 Calculation of design fee Support Cost within City of Irvine Approximate Distance of Project within City of Tustin: (City limit line n/o I-5 ramp terminal intersection to Portola Parkway centerline) 10,910 feet 2.07 miles 85.8% rounded:

Approximate Distance of Project within City of Irvine: (City limit line n/o I-5 ramp terminal intersection to Michelle Drive southern limit line) 1,812 feet 0.34 miles 14.2% $77,110.41 $ 77,100

FINAL ENGINEERING TOTAL FEE
SUBTOTAL: FINAL ENGINEERING HOURS & FEE

REIMBURSABLE EXPENSES
Michael Baker Total
Team Fee
Total Michael Baker
Hours Total Michael Baker Fee
Total Michael
Baker Team
Hours
Subconsultant LaBelle
Marvin

Page 1 ends

Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC ATTACHMENT 2
Cooperative Agreement with the City of Irvine
Docusign Envelope ID: 637F7434-8B0F-82A9-8285-FF7200C8B0B4 Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC

COOPERATIVE AGREEMENT
FOR

JAMBOREE ROAD REHABILITATION PROJECT
This COOPERATIVE AGREEMENT FOR JAMBOREE ROAD REHABILITATION PROJECT (MICHELLE DRIVE TO PORTOLA PARKWAY) (“Agreement”) is made and entered into as of July 21, 2026 (“Effective Date”) by and between the City of Irvine (“Irvine”) and the City of Tustin (“Tustin”). Irvine and Tustin are sometimes individually referred to as “Party” and collectively as “Parties.”

RECITALS
A. WHEREAS, the pavement condition on Jamboree Road between Michelle Drive and Portola Parkway requires rehabilitation, and
B. WHEREAS, the jurisdictional boundary between Irvine and Tustin runs through this segment of Jamboree Road, and
C. WHEREAS, the Parties desire to share the cost of said rehabilitation of Jamboree Road, hereinafter referred to as the "Project". The cost of design of the Project will be proportionately funded by Irvine and Tustin based on percentage of Project area within each city’s jurisdiction. The cost of construction will be based on the actual cost of the work within each City’s jurisdiction.

NOW, THEREFORE, in consideration of the above recitals, which are incorporated herein by reference, and the mutual covenants set forth below, the Parties hereby agree as follows:

AGREEMENT

1. Lead Agency. Tustin will be the lead agency under CEQA, for the final design and construction phase of the Project.

2. Payment of Contributions.
a. Eighty-Five and eight tenths percent (85.8%) of the Project area is located within Tustin; Fourteen and two tenths percent (14.2%) of the Project area is located within Irvine. Irvine and Tustin will each contribute one hundred percent (100%) of the construction costs for work completed within each respective jurisdiction. The cost of design and construction administration will be proportionately funded by Irvine and Tustin based on percentage of Project area within each City’s jurisdiction. The total Project costs are estimated to be $13,500,000, with Tustin’s estimated cost to be $12,300,000 and Irvine’s estimated to be $1,200,000. Such estimates are Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC provided for illustration purposes only, and do not limit each Party’s payment obligation under this Agreement.
b. Tustin shall invoice Irvine for payment of their share of costs at the end of the construction phase of the Project. Irvine agrees to pay all non-disputed and costs approved by Irvine within thirty (30) days of receipt of said invoice.

Tustin shall provide a final accounting of all Project costs associated with the Irvine portion of the Project to Irvine within thirty (30) days after the Parties accept the Project as complete.

3. Final Design Phase.
a. In the final design phase, Tustin shall cause the preparation of the final design plans, engineer’s estimate, specifications, and special provisions for the Project. Plans, specifications, and special provisions shall be prepared pursuant to Irvine’s latest standard plans and specifications for the portions of the Project within Irvine. The engineer’s estimate shall show the separation between Irvine improvements and Tustin improvements. Irvine shall review the engineer’s estimate and review and sign the final design drawings for the Project within Irvine prior to bid advertisement. Tustin and Irvine agree to reasonably cooperate in resolving any disputes over the final design drawings.

4. Agency Review of Documents. Tustin and Irvine shall each incur their own costs associated with the plan check and review of all documents.

5. Construction.
a. In the construction phase, Tustin shall be responsible for the final construction documents, construction, and all construction related activities for the Project.
b. The Project shall include separate bid items between Tustin and Irvine for all direct construction costs. All indirect construction costs that are not separated shall be allocated between Tustin and Irvine in accordance with Paragraph 2(a).
c. Costs associated with construction inspection of the Project within each respective jurisdiction shall be included in the Project costs, not to exceed 15% of the construction costs.
d. Irvine shall allow Tustin, its representatives, agents, and contractors access to portions of the Project site within Irvine right-of-way with an approved Irvine permit as stated in Section 7 and on private property within Irvine Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC boundaries once easements are secured with the applicable property owner(s). Tustin shall allow Irvine staff reasonable access to the Project site, at all reasonable times and upon advance notice, to perform observations of any work on the Irvine portion of the Project. Tustin shall provide copies of all easements that were secured with the applicable property owner(s) located within Irvine boundaries prior to commencement of construction.
e. Tustin shall notify Irvine of the official advertising dates, bid opening date, contract award date, construction start date, and overall construction schedule. Tustin shall invite a representative from Irvine to attend preconstruction, Project status and final walk-through meetings. f. To the extent permitted by applicable laws and regulations, City of Irvine special provisions, and Traffic Control Plans reviewed and approved by City of Irvine, Irvine shall allow necessary closures to construct the Project improvements. Tustin shall provide notice to Irvine 2 weeks prior to any closure of Irvine streets.
g. Tustin shall require that its contractor for Project construction provide the necessary insurance coverage for construction of the Project and shall require the independent contractor to name Irvine, its elected officials, officers, employees, agents and representatives as additional insureds on the contractor’s commercial general liability and business automobile liability policies, and that the contractor indemnify Irvine, its elected officials, officers, employees, agents, and representatives to the same extent that Tustin is indemnified.
h. Tustin shall provide Irvine final Record Drawings for the Project improvements in pdf format as well as electronic CADD files in AutoCAD format, within 90 calendar days of the project completion and acceptance. i. Tustin shall record a Notice of Completion for the Project and provide Irvine’s clerk with a certified copy of the recorded Notice of Completion.

Upon receipt of such Notice of Completion, Irvine shall accept full maintenance and upkeep responsibilities for the Project improvements that are located within the City of Irvine.
j. Tustin shall cause its contractor for Project construction to warrant the Project against defects in workmanship and materials for a minimum period of one (1) year from the date of acceptance of the Project. It is further agreed that Tustin shall assume the responsibility for causing the Project to be restored to full compliance with the plans and specifications, including any Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC test requirements, for any portion of the Project during which said one year period are found by Irvine or Tustin not to conform with the plans and specifications. This warranty is in addition to any and all other warranties, expressed or implied, with respect to the Project. The warranty and obligations under this section shall in no way be relieved by Tustin’s inspection and/or approval of the whole or any part of the Project. Tustin shall include a clause in its contract with the contractor on the Project that Irvine is an intended third-party beneficiary of the construction contract.

6. Prior Rights. Wherever possible, Irvine and Tustin shall take the necessary actions to exercise and secure its prior rights over all utilities or facilities requiring relocation within their respective jurisdiction in accordance with this Agreement.

7. Encroachment Permit. Tustin shall require that its contractor for Project construction obtain encroachment permit from City of Irvine and comply with all the permit requirements. Irvine agrees to issue a no fee encroachment permit authorizing entry onto Irvine for the Project.

8. Actual Project Cost. Irvine agrees that its contribution for the Improvement shall be based on the actual construction costs for Irvine’s share.

9. Actual Project Costs Exceed Estimates. Tustin agrees to provide the bid summary for work on the Irvine portion of the Project to Irvine for review and approval prior to award of construction contract. In the event the lowest, responsive, and responsible contractor’s construction bid exceeds 10% of the Engineer’s Estimate, both Tustin and Irvine agree to: (1) meet and determine possible Project revisions to reduce costs and rebid the Project, or (2) provide the additional funding. In the event the actual project cost exceeds the engineer’s estimate by 10% or less, both Tustin and Irvine agree Irvine will provide the additional funding based on Section

2. 10. Change Orders and Additional Consulting Services. a. Change orders and additional consulting services affecting Irvine shall be reviewed and subject to written approval by Irvine prior to granting approval.

Costs related to such change orders will be reimbursed by Irvine based on the share percentage stated in Section 2.
b. If either agency requests additional changes that are not necessary for Project completion, those costs would be reimbursed by the requesting agency.
c. Tustin shall furnish Irvine with a copy of any proposed change order to the construction contract, affecting Irvine, within ten (10) days of initiation of changed conditions to such contract. Irvine shall promptly review and Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC respond to proposed change order(s) within five (5) working days of receipt by Irvine. Irvine and Tustin agree to reasonably cooperate in resolving any disputes related to proposed change orders to the construction contract.

Irvine shall not unreasonably withhold written approval of any such change order.

11. Upon satisfactory completion, final inspection and acceptance by Irvine of construction activities for improvements of the Project within Irvine City limits, Irvine shall sign Project acceptance documents and assume all maintenance activities for improvements of the Project within Irvine City limits or pursuant to separate maintenance agreement between Irvine and Tustin. Irvine’s signature, acceptance, and relief of maintenance in accordance with this section shall not be unreasonably withheld.

12. Agency Representatives. The following staff members or as otherwise designated in writing by the City Manager of Irvine or the City Manager of Tustin, shall be the selected representatives of each City to act on each respective City’s behalf with respect to this Agreement. The aforementioned Party representatives shall collectively be referred to as the “Agency Representatives.” Any notices, requests, approvals, plan submittals or communications shall be provided to each representative noted below:

To Irvine: To Tustin:

Luis Estevez Michael Grisso
Director of Public Works Director of Public Works
and Sustainability
[email protected] [email protected]
P.O. Box 19575 300 Centennial Way,
Irvine, CA 92623-9575 Tustin, CA 92780
(949) 724-6902 (714) 573-3350

13. Mutual Indemnification.

Irvine shall indemnify, defend, save and hold harmless Tustin, its City Council, and each of its elected or appointed officers, employees, officials, volunteers and agents from and against any and all loss, damages, liability, claims, including but not limited to bodily injury, death, personal injury, property damages, or any other claims arising out of (i) breach of this Agreement by Irvine or (ii) the willful actions or active negligence or omissions of Irvine, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys’ fees and other reasonable costs incurred in defending any such claim.

Tustin shall indemnify, defend, save, and hold harmless the City of Irvine, and each of their elected or appointed officers, officials, volunteers, agents and employees from and against any and all loss, damages, liability, claims including but not limited to bodily injury, death, personal injury, property damages, or any other Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC claims arising out of (i) breach of this Agreement by Tustin or (ii) the willful actions or active negligence or omissions of Tustin, its employees, or agents in the performance of its obligations pursuant to this Agreement, and shall include attorneys’ fees and other reasonable costs incurred in defending any such claim.

14. Amendment. This Agreement may be amended at any time by the mutual consent of the Parties by a written instrument signed by the Parties.

15. Termination. This Agreement shall commence on the Effective Date and remain in effect until the Agency Representatives find the Project completed, or by mutual consent of the Parties to terminate this Agreement.

16. Entire Agreement. This Agreement represents the entire understanding of the Parties as to those matters contained herein, and no prior oral or written understanding shall be of any force or effect with respect to those matters covered in this Agreement. In the event that any one or more of the phrases, sentences, clauses, or sections contained in this Agreement shall be declared invalid or unenforceable by valid judgement or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder.

17. Litigation fees. Should litigation arise out of this Agreement or the performance thereof, each Party shall bear its own litigation and collection expenses, witness fees, court costs and attorney’s fees.

18. Counterparts. The Agreement and any amendment hereto may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument.

19. In accordance with Government Code section 6505(a), the Parties shall strictly account for all funds, and all receipts and disbursements shall be reported.

20. Independent Contractor. Any contractor(s) hired to construction the Project shall not be an agent or employee of any Party and will perform such work as independent contractor. The Parties agree and intend that Irvine and Newport Beach are independent entities and do not intend by this Agreement to create any partnership, joint venture, or similar business arrangement, relationship, or association between them, except as may be agreed to expressly by this Agreement.

Docusign Envelope ID: D0B81D07-8431-8697-8268-A051C1F9E255 Docusign Envelope ID: 925292DA-3C22-836C-81C8-1E9AE2ED9AFC IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by its duly authorized officers and representatives as of the date first set forth above.

CITY OF IRVINE CITY OF TUSTIN
_______________________ _______________________
By: By: Michael Grisso
City Manager Director of Public Works

ATTEST: ATTEST:
_______________________ _______________________
By: Carl Petersen By: Erica N. Yasuda
City Clerk City Clerk

APPROVED AS TO FORM APPROVED AS TO FORM
________________________ ________________________