Cities Index.
Agenda packet

Ukiah City Council
September 17, 2025

Document
Agenda packet
Meeting
September 17, 2025
Body
Ukiah City Council
Pages
1,716
Original file
122.5 MB
Text extracted from the city's file for reading and search. Open the original on ukiahca.api.civicclerk.com. That file is the official record.

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 4 of 8
H. Layout of tapered roof system showing units required.

I. Documentation of supervisors' and inspectors' qualifications.

1.07 DELIVERY, STORAGE AND MARKING
A. Comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to built-up roofing for storage, handling and installation requirements.

1.08 QUALITY ASSURANCE:

A. Roof insulation on combustible or steel decks shall have a flame spread rating not greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E84, or shall have successfully passed FM Approvals 4450.

1. Insulation bearing the UL label and listed in the UL Building Materials Directory as meeting the flame spread and smoke developed ratings will be accepted inlieu-of copies of test reports.

2. Compliance with flame spread and smoke developed ratings will not be required when insulation has been tested as part of a roof construction assembly of the particular type used for this project and the construction is listed as fire-classified in the UL Building Materials Directory or listed as Class I roof deck construction in the FM Approvals "RoofNav."

3. Insulation tested as part of a roof construction assembly shall bear UL or FM labels attesting to the ratings specified herein.

PART 2 - PRODUCTS

2.01 ADHESIVE MATERIALS
A. Adhesive Materials, General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

1. Liquid-type adhesive materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Plastic Foam Adhesives: 50 g/L.
b. Multipurpose Construction Adhesives: 70 g/L.
c. Fiberglass Adhesives: 80 g/L.
d. Contact Adhesives: 80 g/L.

Page 1598 of 1716 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 5 of 8
e. Other Adhesives: 250 g/L.
f. Non-membrane Roof Sealants: 300 g/L.
g. Sealant Primers for Non-porous Substrates: 250 g/L.
h. Sealant Primers for Porous Substrates: 775 g/L.

B. Primer: ASTM D41.

C. Asphalt: ASTM D312, Type III or IV for vapor retarders and insulation.

D. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.

E. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.

F. Full-Spread Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended spray-applied, low-rise, two-component urethane adhesive formulated to attach roof insulation to substrate or to another insulation layer.

G. Roof Cement: Asbestos free, ASTM D2822, Type I or Type II, ; or, D4586, Type I or Type II.

2.02 ROOF AND DECK INSULATION
A. Roof and Deck Insulation, General: Preformed roof insulation boards approved by roofing manufacturer and listed as component of FM Approvals-approved roofing system.

B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade 2, felt or glassfiber mat facer on both major surfaces.

C. Cellular Glass Board Insulation: ASTM C552, Type IV, kraft-paper sheet faced.

D. Perlite Board Insulation: ASTM C728, expanded perlite, cellulosic fibers, binders, and waterproofing agents with top surface seal coated.

E. Cellulosic Fiber Board Insulation: ASTM C208, Type II, Grade 1 for built-up asphalt or modified bitumen roofing.

F. Tapered Roof Insulation System:

1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass.

Use only one insulation material for tapered sections. Use only factory-tapered insulation.

2. Cut to provide high and low points with crickets and slopes as shown.

3. Minimum thickness of tapered sections; 38 mm (1-1/2 inch).

Page 1599 of 1716 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 6 of 8

4. Minimum slope 1:48 (1/4 inch per 12 inches).

2.03 INSULATION ACCESSORIES
A. Glass (Felt): ASTM D2178, Type VI, heavy duty ply sheet.

B. Cants and Tapered Edge Strips:

1. Wood Cant Strips: Refer to Division 06 Section "Rough Carpentry."

2. Insulation Cant Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.

3. Tapered Edge Strips: 1:12 (one inch per foot), from 0 mm (0 inches), 300 mm to 450 mm (12 inches to 18 inches) wide.
a. Cellulosic Fiberboard: ASTM C208.
b. Mineral Fiberboard: ASTM C726.
c. Perlite Board: ASTM C728.

C. Vapor Retarder:

1. Glass-Fiber Felts: ASTM D2178, Type IV, asphalt impregnated.

2. Self-Adhering Sheet Vapor Retarder: ASTM D1970, minimum of 1.0-mm- (40- mil-) thick, polyethylene film laminated to layer of rubberized asphalt adhesive, or

0.76- to 1.0-mm- (30- to 40-mil-) thick, polyethylene film laminated to layer of butyl rubber adhesive; maximum permeance rating of 6 ng/Pa x s x sq. m (0.1 perm).

2.04 FASTENERS
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM Approvals 4470, designed for fastening substrate board to roof deck.

B. Staples and Nails: ASTM F1667. Type as designated for item anchored and for substrate.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Comply with requirements of Division 07 roofing section.

3.02 PREPARATION
A. Comply with requirements of Division 07 roofing section.

Page 1600 of 1716 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 7 of 8

3.03 RIGID INSULATION INSTALLATION
A. Insulation Installation, General:

1. Install roof insulation in accordance with roofing system manufacturer's written instructions.

2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.

3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.

4. Cant Strips: Install preformed insulation cant strips at junctures of roofing system with vertical construction.

B. Insulation Thickness:

1. Thickness of roof insulation shown on drawings is nominal. Actual thickness shall provide the average thermal resistance "R" value of not less than that specified in Performance Requirements Article.

2. When thickness of insulation to be used is more or less than that shown on the drawings, make adjustments in the alignment and location of roof drains, flashing, gravel stops, fascias and similar items at no additional cost to the Government.

3. Where tapered insulation is used, the insulation thickness at high points and roof edges shall be as shown on the drawings; the thickness at the low point (drains) shall be not less than 38 mm (1-1/2 inches).

5. Use not less than two layers of insulation when insulation is 68 mm (2.7 inch) or more in thickness unless specified otherwise. Stagger joints minimum 150 mm (6 inches).

C. Lay insulating units with close joints, in regular courses and with cross joints broken.

When laid in more than one layer, break joints of succeeding layers of roof insulation with those in preceding layer.

D. Lay units with long dimension perpendicular to the rolled (longitudinal) direction of the roofing felt.

E. Seal all cut edges at penetrations and at edges against blocking with bitumen or roof cement.

F. Cut to fit tight against blocking or penetrations.

G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.

H. Installation Method:

1. Adhered Insulation:

Page 1601 of 1716 ends

SECTION 07 22 00 ROOF AND DECK INSULATION
ROOF AND DECK INSULATION 07 22 00 - 8 of 8
a. Prime substrate as required.
b. Set each layer of insulation firmly in solid mopping of hot asphalt. c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.
d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.

2. Mechanically Fastened Insulation:
a. Fasten insulation in accordance with FM Approval's "RoofNav" requirement in Division 07 roofing section.
b. Fasten insulation to resist uplift pressures specified in Division 07 roofing section.

3. Mechanically Fastened and Adhered Insulation:
a. Fasten first layer of insulation according to "Mechanically Fastened Insulation" requirements.
b. Fasten each subsequent layer of insulation according to "Adhered Insulation" requirements.

END OF SECTION

Page 1602 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 1 of 6
PART 1 GENERAL

1.01 SUMMARY
A. Manufacturer’s requirements for the proper design, use, and installation of an Exterior Insulation and Finish System.

1. The scope of this work includes creating EIFS infill panels at exterior precast panel openings with a heavy aggregate finish.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. ASTM B117 Test Method for Salt Spray (Fog) Testing
B. ASTM C1135 Test Method for Determining Tensile Adhesion Properties of Structural Sealants
C. ASTM D968 Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
D. ASTM D1037 Standard Test Methods for Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
E. ASTM D2247 Practice for Testing Water Resistance of Coatings in 100 Percent Relative Humidity
F. ASTM D2294 Standard Test Method for Creep Properties of Adhesives in Shear by Tension Loading (Metal-to-Metal).

G. ASTM D2794 Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
H. ASTM D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of I. ASTM E84 Test Method for Surface Burning Characteristics of Building Materials J. ASTM E108 Standard Test Methods for Fire Tests of Roof Coverings K. ASTM E119 Standard Test Method for Fire Tests of Building Construction and Materials.

L. ASTM E330 Test method for Structural Performance by Uniform Static Air Pressure Difference
M. ASTM E331 Test Method for Water Penetration by Uniform Static Air Pressure Difference

Page 1603 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 2 of 6
N. ASTM E695 Method for Measuring Relative Resistance to Impact Loading O. ASTM E2134 Standard Test Method for Evaluating the Tensile-Adhesion Performance of an Exterior Insulation and Finish System (EIFS)
P. ASTM E2430 Standard Specification For Expanded Polystyrene (“EPS”) Thermal Insulation Boards For Use In Exterior Insulation and Finish Systems (“EIFS”)
Q. ASTM E2485 Standard Test Method for Freeze/Thaw Resistance of Exterior Insulation and Finish Systems (EIFS) and Water Resistive Barrier Coatings R. ASTM E2486 Standard Test Method for Impact Resistance of Class PB and PI Exterior Insulation and Finish Systems (EIFS)
S. ASTM G155/ Accelerated Weathering for Exposure of Nonmetallic Materials G153
T. Fed. Spec. Coating,Textured (For Interior and Exterior Masonry Surfaces) TT-C-555B
U. MIL STD 810B Military Standard, Environmental Test Methods V. NFPA 259 Test Method for Potential Heat of Building Materials W. NFPA 268 Standard Test Method for Determining Ignitability of Exterior Wall Assemblies Using a Radiant Heat Energy Source
X. NFPA 285 Standard Method of Test for the Evaluation of Flammability characteristics of Exterior Nonload-bearing Wall Assemblies Containing Combustible Components Using the Intermediate-scale, Multistory Test Apparatus

1.04 SUBMITTALS
A. Submit Samples, Evaluation Reports, warranties and Certificates.

1.05 QUALITY ASSURANCE
A. Qualifications

1. All EIFS assembly materials must be manufactured or sold by a single-source manufacturer.

2. Applicator:
a. Must process a current manufacture’s certificate of education b. Must be experienced and competent in installation of plaster-like materials

1.06 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials in original packaging with manufacturer’s identification B. Storage: Store materials in a cool, dry location, out of sunlight, protected from weather and other harmful environment, and at a temperature above 40°F (4°C) and below 110°F (43°C) in accordance with manufacturer's instructions.

Page 1604 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 3 of 6

1.07 SITE CONDITIONS
A. Installation Ambient Air Temperature: Minimum of 40°F (4°C) and rising, and remain so for 24 hours thereafter.

B. Substrate Temperature: Do not apply materials to substrates whose temperature are below 40°F (4°C) or contain frost or ice.

C. Inclement Weather: Do not apply materials during inclement weather unless appropriate protection is employed.

D. Sunlight Exposure: Avoid, when possible, installation of the materials in direct sunlight.

Application of Acrylic Finishes in direct sunlight in hot weather may adversely affect aesthetics.

E. Materials shall not be applied if ambient temperature exceeds 120°F (49°C) or falls below 40°F (4°C) within 24 hours of application. Protect materials from uneven and excessive evaporation during hot, dry weather.

F. Prior to installation, the substrate shall be inspected for surface contamination, or other defects that may adversely affect the performance of the materials and shall be free of residual moisture.

1.08 WARRANTY
A. Warranty: Manufacturer’s 5 Year Warranty.

PART 2 PRODUCTS

2.01 MATERIALS
A. Manufacturer, Basis of Design: Parex USA, Inc.

2.02 MATERIALS
A. Adhesives:

1. Parex 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.

B. Insulation Board: In compliance with manufacturer’s requirments for Standard System EIFS.

1. Produced and labeled under a third party quality program as required by applicable building code; and produced by a manufacturer approved by Parex USA.

2. Shall conform to ASTM C578 and ASTM E2430, Type I and the Parex USA specification for Molded Expanded Polystyrene Insulation board.

3. Maximum size shall be 2 ft x 4 ft (610 mm x 1219 mm).

4. Thickness: 3/4 in, minimum (19 mm) after rasping.

C. Base Coats:

1. 302 ABC-N1 Base Coat & Adhesive: 100% acrylic polymer base, ready to use, applied without the addition of cement.

Page 1605 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 4 of 6
D. Reinforcing Mesh:

1. 358.10 Intermediate Impact 10 Mesh: Wight 12 oz per sq. yd. (407 g/sq m) Reinforcing mesh used with a Standard Sustem, to achieve ASTM E2486 intermediate impact strength.

2. 356 Short Detail Mesh: Reinforcing mesh used for backwrapping and details.

E. Primer:

1. Parex USA Primer: 100% acrylic based coating to prepare surfaces for acrylic or elastomeric finishes.

2. Variance VariPrime Sanded: 100% acrylic based coating to prepare surface for exposed aggregate specialty finishes
F. Finish:

1. Parex USA Variance. Acrylic-based specialty finish. Finish type, texture, and color per Section 09 06 00 Schedules for Finishes.

2. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealter for use as a protective coating over acrylic finishes. Use 600 Clear or Matte Clear.
a. Variance Antiquing Gel: a water-based, tinted, semi-transparent, acrylic emulsion for staining, sealing, and protecting concrete, masonry and other cementitious substrates. Use as required to achieve desired finish.

3. Parex USA Clear Sealer: 100% acrylic, transparent, permeable, dirt resistant sealer for use as a protective coating over acrylic finishes. Use 600 Clear or 610 Matte Clear.

G. Portland Cement: ASTM C150, Type I or Type I-II.

H. Water: Clean, cool, potable water.

2.03 RELATED MATERIALS AND ACCESSORIES
A. Substrate Material: Concrete
B. Sealant System:

1. Sealant for expansion joints between panelized EIFS sections shall be ultra-low modulus designed for minimum 100% elongation and minimum 50% compression and as selected by Project Designer.

2. Sealant for perimeter seals around window and door frames and other wall penetrations shall be low modulus, designed for minimum 50% elongation and minimum 25% compression, and as selected by Project Designer.

3. Sealants shall conform to ASTM C 920, Grade NS.

4. Expansion joints between sections of EIFS shall have a minimum width of 3/4 in (19 mm).

5. Perimeter seal joints shall be a minimum width of 1/2 in (12.7 mm).

Page 1606 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 5 of 6

6. Sealant backer rod shall be closed-cell polyethylene foam.

7. Apply sealant to tracks or base coat of EIFS.

8. Refer to EIFS manufacturer’s current bulletin for listing of sealants which have been tested and have been found to be compatible with EIFS materials.

9. Joint design, surface preparation, and sealant primer shall be based on sealant manufacturer's recommendations and project conditions.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify project site conditions.

B. Compliance: Comply with manufacturer’s instructions for installation.

C. Substrate Examination: Examine prior to installation of EIFS assembly materials as follows:

1. Substrate shall be examined for soundness, and other harmful conditions.

2. Substrate shall be free of dust, dirt, laitance, efflorescence, and other harmful contaminants.

D. Sealants and Backer Rod: To be installed, where required, in accordance with the sealant manufacturer's specifications and published literature, and using the sealant manufacturers recommended primers.

E. Advise Contractor of discrepancies preventing proper installation of the EIFS materials.

Do not proceed with the work until unsatisfactory conditions are corrected.

3.02 PREPARATION
A. Protection: Protect surrounding material surfaces and areas during installation of system.

B. Clean surfaces thoroughly prior to installation.

C. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 MIXING
A. Mix materials in accordance with manufacturer’s instructions.

3.04 APPLICATION
A. General: Installation shall conform to this specification and manufacturer’s written instructions.

B. Insulation Board:

1. Install back-wrap mesh or edge-wrap mesh at system terminations.

2. Apply EIFS adhesive to backs of insulation boards with a notched trowel, with ribbons of adhesive oriented in a vertical direction (parallel to the 2 ft (61 mm) dimension of the EPS board).

Page 1607 of 1716 ends

SECTION 07 24 00 INSULATION & FINISH SYSTEM (EIFS)
INSULATION & FINISH SYSTEMS (EIFS) 07 24 00 - 6 of 6

3. Install insulation board without gaps in a running bond pattern and interlocked at corners.

4. Rasp irregularities off insulation board after adhesive has dried a minimum of 24 hours.

C. Apply base coat and fully embed mesh in base coat; include diagonal mesh patches at corners of openings and reinforcing mesh patches at joints of track sections. Apply multiple layers of base coat and mesh where required for specified impact resistance classification.

D. Apply primer to base coat after drying. Primer may be omitted if it is not required by the manufacturer's product data sheets for the specified finish coat or otherwise specified for the project.

E. Finish Coat: Apply finish coat to match specified finish type, texture, and color. Do not apply finish coat to surfaces to receive sealant. Keep finish out of sealant joint gaps.

3.05 CLEAN-UP
A. Removal: Remove and legally dispose of EIFS materials from job site.

B. Clean surfaces and work area of foreign materials resulting from material installation.

3.06 PROTECTION
A. Provide protection of installed materials from water infiltration into or behind them.

B. Provide protection of installed materials from dust, dirt, precipitation, and freezing during installation, and continuous high humidity until fully cured and dry.

C. Clean exposed surfaces using materials and methods recommended by the manufacturer of the material or product being cleaned. Remove and replace work that cannot be cleaned to the satisfaction of the Project Designer/Owner.

END OF SECTION 07 24 00

Page 1608 of 1716 ends

SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 1 of 2
PART 1 GENERAL

1.01 SUMMARY
A. Vapor retarder under concrete slabs on grade.

1.02 RELATED SECTIONS
A. All Sections listed in the Table of Contents are a Condition of this Section.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Submit for vapor retarder sheet and installation accessories. Include data from tests performed within 18 months of submittal showing compliance with specified standard.

C. Shop Drawings: Show extent of vapor retarder work. Include details for edges at walls, grade beams, and the like. Include details for penetrating elements including conduit, piping, and structural membranes.

PART 2 PRODUCTS

2.01 VAPOR RETARDER
A. Plastic Sheet Vapor Retarder: Meeting ASTM E 1745, Class A. Minimum 15 mil thick polyolefin sheet.

Acceptable types include:

1. Stego Wrap by Stego Industries

2. Moistop Ultra A by Fortifiber Corp

3. VaporBlock 15 by Raven Industries

4. Perminator by W.R. Meadows
B. Accessory Products

1. Provide manufacturer’s recommended self-adhesive plastic seam tape for seams and penetrations.

2. Penetration boots: Provide manufacturer’s recommended accessory system for sealing pipe and conduit penetrations.

Page 1609 of 1716 ends

SECTION 07 26 16 UNDERSLAB VAPOR RETARDER
UNDERSLAB VAPOR RETARDER 07 26 16 - 2 of 2
PART 3 EXECUTION

3.01 EXAMINATION
A. Verify that surface to receive vapor retarder is compacted and trimmed smooth.

B. Verify that all work that will penetrate vapor retarder is complete and rigidly installed.

C. Confirm locations and details of vapor retarder termination.

3.02 VAPOR RETARDER INSTALLATION
A. General: Comply with requirements of ASTM E 1643 and manufacturer’s published instructions.

B. Place plastic sheet vapor retarder directly on compacted granular fill. Place sheeting with longest dimension parallel with direction of pour.

C. Lap joints 6 inches and seal with per manufacturer’s recommendations with pressure sensitive tape.

D. Tape seal vapor retarder at all perimeters.

E. Tape seal vapor retarder around columns, pipe, and conduit penetrations.

F. Avoid cutting or puncturing vapor retarder/barrier during reinforcement placement and concreting operations. Repair damages before placing concrete.

END OF SECTION

Page 1610 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 1 of 7
PART 1 GENERAL

1.01 SUMMARY
A. Section Includes: Provide materials and accessories as required for complete installation.

1. Surface preparation.

2. Application of liquid applied vapor permeable air barrier. May be referred to weather resistive barrier on Drawings.

3. Application of materials to provide bridge and seal air leakage pathways in a. Wall and roof connections and penetrations.
b. Walls, windows, louvers or doors
c. All other penetrations through the wall assembly.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 REFERENCES
A. ASTM D412-98a(2002)e1 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers-Tension.

B. ASTM E96-00e1 (Method B) - Standard Test Methods for Water Vapor Transmission of Materials.

C. ASTM E283-91 (1999) - Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.

D. ASTM E783 - Standard Test Method for Field Measurement of Air Leakage through Installed Exterior Windows and Doors.

E. ASTM E1105 - Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference.

F. ASTM E2178-01 - Standard Test Method for Air Permeance of Building Materials.

Page 1611 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 2 of 7
G. ASTM E2357 - 05 Standard Test Method for Determining Air Leakage of Air Barrier Assemblies.

1.04 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Furnish manufacturer's literature for each type of insulation.

1. Product Data: Include manufacturer's written instructions for evaluating, preparing, and treating substrate; technical data; and tested physical and performance properties of air barrier.

2. Shop Drawings: Show locations and extent of air barrier. Include details for substrate joints and cracks, counterflashing strip, penetrations, inside and outside corners, terminations, and tie-ins with adjoining construction. Include details of interfaces with other materials that form part of air barrier.

3. Use an experienced installer and adequate number of skilled personnel who are thoroughly trained and experienced in the application of the air barrier.

4. Obtain air/vapor barrier materials from a single manufacturer regularly engaged in manufacturing the product.

5. Provide products which comply with all state and local regulations controlling use of volatile organic compounds (VOCs).

1.05 MOCK-UP
A. Before beginning installation of air barrier, build mockups of exterior wall assembly, full height by ten (10) feet wide, including parapet, backup wall construction, external cladding, window, door frame and sill, insulation, and flashing to demonstrate surface preparation, crack and joint treatment, and sealing of gaps, terminations, and penetrations of air barrier membrane.

1. Coordinate construction of mockup to permit inspection of air barrier before external insulation and cladding is installed.

2. Reconstruct mockups do not comply with requirements.

3. Approved mockups may become part of the completed.

4. Include installers of other construction connecting to air barrier, including roofing, waterproofing, composite metal wall panels, metal wall panels, sealants, windows, glazed curtain walls, and door frames.

5. Review air barrier requirements including surface preparation, substrate condition and pretreatment, minimum substrate curing period, forecasted weather conditions, special details and sheet flashings, mockups, installation

Page 1612 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 3 of 7
procedures, sequence of installation, testing and inspecting procedures, and protection and repairs.

1.06 DELIVERY, STORAGE AND HANDLING
A. Store liquid materials in their original undamaged packages in a clean, dry, protected location and within temperature range required by air barrier manufacturer.

B. Store at temperatures at or above 40oF (4oC), free from contact with cold or frozen surfaces.

C. Remove and replace liquid materials that cannot be applied within their stated shelf life.

D. Protect stored materials from direct sunlight.

E. Protect materials during handling and application to prevent damage or contamination.

1.07 ENVIRONMENTAL REQUIREMENTS
A. Product not intended for uses subject to abuse or permanent exposure to the elements.

B. Do not proceed with product application if rainfall is forecast or imminent within 12 hours.

C. Do not apply membrane when air or surface temperatures are below 40oF (4oC).

D. Do not apply when air, material and surface temperatures are expected to fall below 32º F (0º C) within 24 hours of completed application.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Carlisle
B. Grace
C. Henry
D. Rubber Polymer Corporation
E. Tremco
F. W.R. Meadows

2.02 FLUID-APPLIED MEMBRANE AIR BARRIER
A. Fluid-Applied, Vapor Impermeable Membrane Air Barrier: Two-component, self-curing synthetic-rubber-based membrane, free of solvents, isocyanates and bitumen, suitable for spray application to wet film and dry film thickness of 60 mils.

Page 1613 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 4 of 7
B. Basis-of-Design Product: Products specified to establish required level of performance, quality, and appearance are by Grace Construction Products, Perm-A-Barrier.

2.03 AUXILIARY MATERIALS
A. General: Auxiliary materials recommended by air barrier manufacturer for intended use and compatible with air barrier membrane. Liquid-type auxiliary materials shall comply with VOC limits.

B. Transition Membrane Primer: Grace Construction Products; "Perm-A-Barrier WB Primer." Liquid primer recommended for substrate by manufacturer of air barrier material when applying flashing and transition membranes directly to substrate.

C. Flashing and Transition Membrane: Grace Construction Products; "Perm-A-Barrier Wall Flashing."Modified bituminous, 40-mil thick, self-adhering sheet consisting of 32 mils of rubberized asphalt laminated to an 8-mil thick, cross-laminated polyethylene film with release liner backing.

D. Modified Bituminous Transition Membrane: Grace Construction Products; "Perm-ABarrier Detail Membrane." Vapor-retarding, 40-mil- thick, smooth-surfaced, self-adhering; consisting of 36 mils of rubberized asphalt laminated to a 4-mil-thick polyethylene film with release liner backing.

E. Joint Reinforcing Strip: Sheathing manufacturer's glass-fiber-mesh tape.

F. Substrate Patching Membrane: Manufacturer's standard trowel-grade single component substrate filler.

G. Adhesive and Tape: Air barrier manufacturer's standard adhesive and pressure-sensitive adhesive tape.

H. Stainless-Steel Sheet: ASTM A 240/A 240M, Type 304, 0.0250-inch-thick, and Series 300 stainless-steel fasteners.

I. Sprayed Polyurethane Foam Sealant: 1- or 2-component, foamed-in-place, polyurethane foam sealant, 1.5 to 2.0 lb/cu. ft. density; flame spread index of 25 or less according to ASTM E 162; with primer and noncorrosive substrate cleaner recommended by foam sealant manufacturer.

PART 3 EXECUTION

3.01 EXAMINATION
A. Examine surfaces to receive membrane. Notify Architect if surfaces are not acceptable.

Do not begin surface preparation or application until unacceptable conditions have been corrected.

B. Verify that substrates are sound and free of oil, grease, dirt, excess mortar, or other contaminants.

C. Verify that sheathing is attached with proper fasteners and spacing.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

Page 1614 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 5 of 7

3.02 SURFACE PREPARATION
A. Protect adjacent surfaces not designated to receive air barrier.

B. Clean and prepare surfaces to receive air barrier membrane in accordance with manufacturer's instructions.

C. Do not apply membrane to surfaces unacceptable to manufacturer.

D. Patch all holes and voids and smooth out any surface misalignments.

E. Insure joints between dissimilar building materials are sealed with a strip of self-adhesive membrane 10" wide minimum, centered over the joint.

F. Exterior Sheathing Panels:

1. Panels are to be fastened according to sheathing panel manufacturer.

2. Fill all panel joint with detailing compound prior to full application.

3. Gypsum Sheathing: Fill joints greater than 1/4 inch with sealant according to ASTM C 1193 and with air barrier manufacturer's written instructions. Apply first layer of fluid air barrier membrane at joints. Tape joints with joint reinforcing strip after first layer is dry. Apply a second layer of fluid air barrier membrane over joint reinforcing strip.

G. Cover gaps in substrate plane and form a smooth transition from one substrate plane to another with stainless-steel sheet mechanically fastened to structural framing to provide continuous support for air barrier.

3.03 TRANSITION MEMBRANE INSTALLATION
A. Install strips, transition membrane, and auxiliary materials according to air barrier manufacturer's written instructions to form a seal with adjacent construction and maintain a continuous air barrier.

B. Coordinate the installation of air barrier with installation of roofing membrane and base flashing to ensure continuity of air barrier with roofing membrane.

C. Install modified bituminous transition membrane on roofing membrane or base flashing so that a minimum of 3 inches of coverage is achieved over both substrates.

D. Apply primer to substrates at required rate and allow to dry. Limit priming to areas that will be covered by air barrier sheet in same day. Re-prime areas exposed for more than 24 hours.

E. Prime glass-fiber-surfaced gypsum sheathing with number of prime coats needed to achieve required bond, with adequate drying time between coats.

F. Connect and seal exterior wall air barrier membrane continuously to roofing membrane air barrier, floor-to floor construction, exterior glazing and window systems, glazed curtain-wall systems, storefront systems, exterior louvers, exterior door framing, and other construction used in exterior wall openings.

Page 1615 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 6 of 7
G. At end of each working day, seal top edge of strips and transition membranes to substrate with termination mastic.

H. Apply joint sealants forming part of air barrier assembly within manufacturer's recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges.

I. Wall Openings: Prime concealed perimeter frame surfaces of windows, curtain walls, storefronts, doors and louvers. Apply modified bituminous transition membrane so that a minimum of 6 inches of coverage is achieved over both substrates. Maintain 6 inches of full contact over firm bearing to perimeter frames with not less than 2 inches of full contact.

J. Modified Bituminous Transition Membrane: Roll firmly to enhance adhesion.

K. Preformed Silicone-Sealant Extrusion: Set in full bed of silicone sealant applied to walls, frame, and membrane.

L. Fill gaps in perimeter frame surfaces of windows, curtain walls, storefronts, and doors, and miscellaneous penetrations of air barrier membrane with foam sealant.

M. Seal exposed edges of strips at seams, cuts, penetrations, and terminations not concealed by metal counter-flashings or ending in reglets with termination mastic.

N. Repair punctures, voids, and deficient lapped seams in strips and transition membranes.

Slit and flatten fish-mouths and blisters. Patch with transition membranes extending 10 inches beyond repaired areas in membrane direction.

3.04 AIR BARRIER MEMBRANE INSTALLATION
A. Apply air barrier membrane to form a seal with strips and transition membranes and to achieve a continuous air barrier according to air barrier manufacturer's written instructions.

B. Apply air barrier at walls, soffits and fascia to roof barrier.

C. Apply within manufacturer's recommended application temperature ranges.

D. Apply primer to substrates at required rate and allow to dry. Limit priming to areas that will be covered by air barrier sheet in same day. Re-prime areas exposed for more than 24 hours.

E. Prime glass-fiber-surfaced gypsum sheathing with number of prime coats needed to achieve required bond, with adequate drying time between coats.

F. Apply a continuous unbroken air barrier to substrates according to the following minimum thickness. Apply membrane in full contact around protrusions.

G. Vapor-Impermeable Membrane Air Barrier: 60-mil wet film thickness, 60-mil dry film thickness.

Page 1616 of 1716 ends

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
FLUID-APPLIED MEMBRANE AIR BARRIERS 07 27 26 - 7 of 7
H. Apply strip and transition membrane overlapping or onto according to air barrier manufacturer's written instructions.

I. Do not cover air barrier until it has been tested and inspected by testing agency.

J. Correct deficiencies in or remove air barrier that does not comply with requirements; repair substrates and reapply air barrier components.

3.05 CLEANING AND PROTECTION
A. Protect air barrier system from damage during application.

B. Protect air barrier from exposure to UV light and harmful weather exposure as required by manufacturer. Remove and replace vapor-impermeable air barrier exposed for more than 60 days.

C. Keep barrier from contact with creosote, uncured coal-tar products, TPO, EPDM, flexible PVC membranes, and sealants not approved by air barrier manufacturer.

D. Clean spills, stains, and soiling from construction that would be exposed in the completed work using cleaning agents and procedures recommended by manufacturer of affected construction.

E. Remove masking materials after installation.

END OF SECTION

Page 1617 of 1716 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1618 of 1716
SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 1 of 11 PART 1 GENERAL

1.01 DESCRIPTION
A. Thermoplastic Polyolefin (TPO) sheet roofing mechanically fastened to roof deck.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced.

Publications are referenced in the text by the basic designation only. Editions of applicable publications current on date of issue of bidding documents apply unless otherwise indicated.

B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI):

ANSI/SPRI ES-1-03 ...... Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems.

C. American Society of Civil Engineers/Structural Engineering Institute (ASCE/SEI):

ASCE/SEI-7-10 ............. Minimum Design Loads for Buildings and Other Structures D. ASTM International (ASTM):

C1371-04 ...................... Standard Test Method for Determination of Emittance of Materials Near Room Temperature Using Portable
Emissometers
C1549-04 ...................... Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar
Reflectometer
D6878-08 ...................... Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing
E108-10 ......................... Standard Test Methods for Fire Tests of Roof Coverings E408-71(R2008) ............ Standard Test Methods for Total Normal Emittance of Surfaces Using Inspection-Meter Techniques
E1980-01 ....................... Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-Sloped Surfaces in the Field

Page 1619 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 2 of 11 E 2430 -05. . . . . . . Rigid Polystyrene Insulation
C 168. . . . . . . . . .Test method for Thermal Insulation C 177. . . . . . . . . .Test for Steady State Heat flux Measurements, and Thermal insulation E. American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) ASHRAE 90.1-2007 ...... Energy Standard for Buildings Except Low-Rise Residential Buildings, Appendix f.

F. Cool Roof Rating Council:

CRRC-1 ......................... Product Rating Program, www.coolroofs.org G. FM Approvals: Roof Nav Approved Roofing Assemblies and Products. 1-28-09 .......................... Loss Prevention Data Sheet: Design Wind Loads. 1-29-09 .......................... Loss Prevention Data Sheet: Above-Deck Roof Components H. National Roofing Contractors Association: Roofing and Waterproofing Manual I. U.S. Department of Energy (DoE): Roof Products Qualified Product List, www.energystar.gov

1.04 PERFORMANCE REQUIREMENTS
A. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.

B. Roofing System Energy Performance Requirements: Provide a roofing system identical to components that that have been successfully tested by a qualified independent testing and inspecting agency to meet the following requirements:

C. Energy Performance, Energy Star: Provide roofing system that is listed on DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products. www.energystar.gov.

1. Solar Reflectance Index: Not less than 82 when calculated according to ASTM E1980 based on testing identical products by a qualified testing agency. www.coolroofs.com.

1.05 QUALITY CONTROL
A. Installer Qualifications:

1. Licensed or approved in writing by manufacturer to perform work under warranty requirements of this Section.

2. Employ full-time supervisors knowledgeable and experienced in roofing of similar types and scopes, and able to communicate with owner and workers.

Page 1620 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 3 of 11 B. Inspector Qualifications: Inspection of work by third-party technical inspector or technical representative of manufacturer experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer’s compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be an independent party certified as a Registered Roof Observer by the Roof Consultants Institute (RCI), retained by the Contractor and approved by the Manufacturer
C. Product/Material Requirements:

1. Obtain products from single manufacturer or from sources recommended by manufacturer for use with roofing system and incorporated in manufacturer's warranty.

D. Roofing system design standard requirements:

1. Recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to Thermoplastic Polyolefin (TPO) roofing for storage, handling and application.

2. Recommendations of FM Approvals 1-49 Loss Prevention Data Sheet for Perimeter Flashings.

3. Recommendations of ANSI/SPRI ES-1 for roof edge design.

4. Roofing System Design: Provide roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressure calculated according to ASCE/SEI 7. a. Corner Uplift Pressure: (75 lbf/sq. ft.).
b. Perimeter Uplift Pressure: (75 lbf/sq. ft.).
c. Field-of-Roof Uplift Pressure: (75 lbf/sq. ft.).

5. FM Approvals Listing: Provide roofing membrane, base flashing, and component materials that comply with requirements in FM Approvals 4450 and FM Approvals 4470 as part of a roofing system and that are listed in FM Approvals "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.
a. Fire/Windstorm Classification: Class 1A-75.
b. Hail Resistance: MH.

E. Pre-Roofing Meeting:

1. Prior to roofing, discuss specific expectations and responsibilities, construction procedures, specification requirements, application, environmental conditions, job and surface readiness, material storage, and protection with COR to:
a. Verify that work of other trades which penetrates roof deck is completed.

Page 1621 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 4 of 11 b. Determine adequacy of deck anchorage, presence of foreign material, moisture and unlevel surfaces, or other conditions that would prevent application of roofing system from commencing or cause a roof failure. c. Examine samples and installation instructions of manufacturer.

1.06 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, SAMPLES.

B. Product Data:

1. Adhesive materials.

2. Membrane sheet roofing and flashing membrane.

3. Roof Insulation

3. Fastening requirements.

4. Application instructions.

C. Samples:

1. Nails and fasteners, each type.

D. Shop Drawings: Include plans, sections, details, and attachments.

1. Base flashings and terminations.

2. Layout of insulation, crickets, edge conditions and roof drains, scuppers etc.

E. Certificates:

1. Indicating materials and method of application of roofing system meets requirements of FM Approvals "RoofNav" for specified fire/windstorm classification.

2. Indicating compliance with energy performance requirement.

3. Labatory test reports: Thermal values of insulation products.

4. Indicating Thermal conductance, and minimum average thickness of insulation.

F. Warranty: As specified.

G. Documentation of supervisors' and inspectors' qualifications.

H. Field reports of roofing inspector.

I. Contract Close-out Submittals:

1. Maintenance Manuals.

Page 1622 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 5 of 11

2. Warranty signed by installer and manufacturer.

1.07 DELIVERY, STORAGE AND HANDLING
A. Comply with the recommendations of the NRCA “Roofing and Waterproofing Manual” applicable to single ply membrane roofing for storage, handling and installation.

1.08 ENVIRONMENTAL REQUIREMENTS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

1.09 WARRANTY
A. Roofing work subject to 10 years.

1.10 QUALITY ASSURANCE:

A. Roof insulation on steel deck shall have a flame spread rating no greater than 75 and a smoke developed rating not greater than 150, exclusive of covering, when tested in accordance with ASTM E 84, or shall have successfully passed FM Approvals 4450.

PART 2 PRODUCTS

2.01 TPO MEMBRANE ROOFING
A. TPO Sheet: ASTM D6878, internally fabric or scrim reinforced, 1.5 mm (60 mils) thick, with no backing.

B. Color: White.

2.02 ACCESSORIES
A. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as TPO sheet membrane.

B. Bonding Adhesive: Manufacturer's standard, water based.

C. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 25 by 3 mm (1 by 1/8 inch) thick; with anchors.

D. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated or zinc-coated steel sheet, approximately 25 mm wide by 1.3 mm (1 inch wide by 0.05 inch) thick, prepunched.

E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with FM Approvals 4470, designed for fastening membrane to substrate.

G. Miscellaneous Accessories: Provide sealers, preformed flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories acceptable to manufacturer.

Page 1623 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 6 of 11 H. Roof and Deck Insulation.

2.03 ADHESIVE AND SEALANT MATERIALS
A. General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

B. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

PART 3 – EXECUTION

3.01 EXAMINATION
A. Examine substrates and conditions with roofing Installer and roofing inspector to verify compliance with project requirements and suitability to accept subsequent roofing work.

Correct unsatisfactory conditions before proceeding with roofing work.

B. Do not apply roofing if roof surface will be used for subsequent work platform, storage of materials, or staging or scaffolding will be erected thereon unless system is protected.

3.02 PREPARATION
A. Complete roof deck construction prior to commencing roofing work:

1. Install curbs, blocking, edge strips, nailers, cants, and other components where insulation, roofing, and base flashing is attached to, in place ready to receive insulation and roofing.

2. Complete deck and insulation to provide designed drainage to working roof drains.

3. Document installation of related materials to be concealed prior to installing roofing work.

B. Dry out surfaces, including the flutes of metal deck that become wet from any cause during progress of the work before roofing work is resumed. Apply materials to dry substrates.

C. Sweep decks to broom clean condition. Remove all dust, dirt or debris.

D. Remove projections that might damage materials.

3.04 INSTALLATION, GENERAL
A. FM Approvals Installation Standard: Install roofing membrane, base flashings, wood cants, blocking, curbs, and nailers, and component materials in compliance with requirements in FMG 4450 and FMG 4470 as part of a membrane roofing system as listed in FM Approval's "RoofNav" for fire/windstorm classification indicated. Comply with recommendations in FM Approvals' Loss Prevention Data Sheet 1-49, including requirements for nailers and cants.

Page 1624 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 7 of 11 B. NRCA Installation Standard: Install roofing system in accordance with applicable NRCA Manual Plates and NRCA recommendations.

C. Manufacturer Recommendations: Comply with roofing system manufacturer's written installation recommendations.

D. Coordination with related work: Coordinate roof operations with roof insulation and sheet metal work so that insulation and flashings are installed concurrently to permit continuous roofing operations.

E. Installation Conditions:

1. Apply dry roofing materials. Apply roofing work over dry substrates and materials.

2. Apply materials within temperature range and surface and ambient conditions recommended by manufacturer.

3. Except for temporary protection, do not apply materials during damp or rainy weather, during excessive wind conditions, nor while moisture (dew, snow, ice, fog or frost) is present in any amount in or on the materials to be covered or installed:
a. Do not apply materials when the temperature is below 4 deg. C (40 deg.

F).
b. Do not apply materials to substrate having temperature of 4 deg. C (40 deg. F) or less.

3.05 RIGID INSULATION INSTALLATION
A. Insulation Installation, General:

1. Install roof insulation in accordance with roofing system manufacturer's written instructions.

2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.

3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.

4. Cant Strips: Install preformed insulation cant strips strips at junctures of roofing system with vertical construction.

5. Use same insulation as existing for roof repair and alterations unless specified otherwise.

B. Insulation Thickness:

1. Thickness of roof insulation shown on drawings is nominal. Actual thickness shall provide the average thermal resistance "R" value of not less than that specified in Performance Requirements Article.

Page 1625 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 8 of 11

2. Insulation on Metal Decks: Provide minimum thickness of insulation for metal decks recommended by the insulation manufacturer to span rib opening (flute size) of metal deck used. Support edges of insulation on metal deck ribs.

3. When thickness of insulation to be used is more or less than that shown on the drawings, make adjustments in the alignment and location of roof drains, flashing, gravel stops, fascias and similar items at no additional cost to the Owner.

4. Where tapered insulation is used, the thickness of the insulation at high points and roof edges shall be as shown on the drawings; the thickness at the low point (drains) shall be not less than 38 mm (1-1/2 inches).

5. Use not less than two layers of insulation when insulation is 68 mm (2.7 inch) or more in thickness unless specified otherwise. Stagger joints minimum 150 mm (6 inches).

C. Lay insulating units with close joints, in regular courses and with cross joints broken.

When laid in more than one layer, break joints of succeeding layers of roof insulation with those in preceding layer.

D. Lay units with long dimension perpendicular to the rolled (longitudinal) direction of the roofing felt.

E. Seal all cut edges at penetrations and at edges against blocking with bitumen or roof cement.

F. Cut to fit tight against blocking or penetrations.

G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.

3.06 INSTALLATION OF TPO ROOFING
A. Do not allow the membrane to come in contact with surfaces contaminated with asphalt, coal tar, oil, grease, or other substances which are not compatible with TPO.

B. Install the membrane so the sheets run perpendicular to the long dimension of the insulation boards.

C. Commence installation at the low point of the roof and work towards the high point. Lap the sheets so the flow of water is not against the edges of the sheet.

D. Position the membrane so it is free of buckles and wrinkles.

E. Roll sheet out on deck; inspect for defects as being rolled out and remove defective areas. Allow for relaxing before proceeding.

1. Lap edges and ends of sheets 50 mm (two inches) or more as recommended by the manufacturer.

2. Heat weld laps. Apply pressure as required. Seam strength of laps as required by ASTM D4434.

3. Check seams to ensure continuous adhesion and correct defects.

Page 1626 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 9 of 11

4. Finish edges of laps with a continuous beveled bead of sealant to sheet edges to provide smooth transition.

5. Finish seams as the membrane is being installed (same day).

6. Anchor perimeter to deck or wall as specified.

F. Repair areas of welded seams where samples have been taken or marginal welds, bond voids, or skips occurs.

G. Repair fishmouths and wrinkles by cutting to lay flat and installing patch over cut area extending 100 mm (four-inches) beyond cut.

H. Membrane Perimeter Anchorage:

1. Install metal fastening strip at the perimeter of each roof level, curb flashing, expansion joints and similar penetrations as indicated and in accordance with membrane manufacturer's instructions on top of roof membrane to deck or wall.

2. Mechanically Fastened Metal Fastening Strip:
a. Set top of mechanical fastener set flush with top surface of the metal fastening strip. Space mechanical fasteners a maximum 300 mm (12 inches) on center starting 25 mm (one inch) from the end of the nailing strip.
b. When strips are cut round corners and eliminate sharp corners. c. After mechanically fastening strip cover and seal strip with a six-inch wide roof membrane strip; heat weld to roof membrane and seal edges. d. At roof edge metal, turn the membrane down over the front edge of the blocking or the nailer to below blocking. Secure the membrane to the vertical portion of the nailer; or, if required by the membrane manufacturer with fasteners spaced not over 300 mm (12 inches) on centers.
e. At parapet walls, intersecting building walls and curbs, secure the membrane to the structural deck with fasteners 300 mm (12 inches) on centers or as shown on NRCA manual.

I. Mechanically-Attached System:

1. Secure the membrane to the structural deck with fasteners through stress plate or batten strips spaced and patterned in accordance with the membrane manufacturer's instructions to achieve specified wind uplift performance.

2. When fasteners are installed within the laps of adjoining sheets, position the fastener so that the stress plates are a minimum 13 mm (1/2)inch) from the edge of the sheets.

3. Where fasteners are installed over the membrane after the seams have been welded, cover the fasteners with a minimum 175 mm (seven inch) wide round TPO membrane cap centered over the fasteners. If batten strips are used cover the strip with a minimum 175 mm (seven inch) wide TPO strip centered over the

Page 1627 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 10 of 11 batten. Heat weld to the roof membrane and finish edges with sealant as specified. Finish edges with sealant as specified.

4. Before installing fasteners into cast in place concrete, pre-drill the correct size hole into the deck. Drill the hole 9 mm (3/8 inch) deeper than the fastener penetration.

3.07 INSTALLATION OF FLASHING
A. Install flashings as the membrane is being installed. If the flashing cannot be completely installed in one day, complete the installation until the flashing is in a watertight condition and provide temporary covers or seals.

B. Flashing Roof Drains:

1. Install roof drain flashing as recommended by the membrane manufacturer, generally as follows:
a. Coordinate to set the metal drain flashing in asphalt roof cement, holding cement back from the edge of the metal flange.
b. Do not allow the roof cement to come in contact with the TPO roof membrane.
c. Adhere the TPO roof membrane to the metal flashing with the membrane manufacturer's recommended adhesive.

2. Turn down the metal drain flashing and TPO roof membrane into the drain body and install clamping ring and strainer.

C. Installing TPO Base Flashing and Pipe Flashing:

1. Install TPO flashing membranes to pipes, wall or curbs to a height not less than eight-inches above roof surfaces and 100 mm (four inches) on roof membrane. a. Adhere flashing to pipe, wall or curb with adhesive. b. Form inside and outside corners of TPO flashing membrane in accordance with NRCA manual. Form pipe flashing in accordance with NRCA manual use pipe boot.
c. Lap ends not less than 100 mm (four inches).
d. Heat weld flashing membranes together and flashing membranes to roof membranes. Finish exposed edges with sealant as specified. e. Install flashing membranes in accordance with NRCA manual.

2. Anchor top of flashing to walls or curbs with fasteners spaced not over 200 mm (eight inches) on centers. Use fastening strip on ducts. Use pipe clamps on pipes or other round penetrations.

3. Apply sealant to top edge of flashing.

D. Installing Building Expansion Joints:

Page 1628 of 1716 ends

SECTION 07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07 54 23 - 11 of 11

1. Install base flashing as shown.

2. Coordinate installation with metal expansion joint cover or roof expansion joint system.

E. Repairs to membrane and flashings:

1. Remove sections of TPO sheet roofing or flashing that is creased wrinkled or fish-mouthed.

2. Cover removed areas, cuts and damaged areas with a patch extending 100 mm (four inches) beyond damaged, cut, or removed area. Heat weld to roof membrane or flashing. Finish edge of lap with sealant as specified.

3.08 FIELD QUALITY CONTROL
A. Roofing Inspector: Contractor will engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.

1. Examine and probe seams in the membrane and flashing in the presence of Architect, Owner and Membrane Manufacturer's Inspector.

2. Probe edge of welded seams with a blunt tipped instrument. Use sufficient hand pressure to detect marginal welds, voids, skips, and fish-mouths.

C. Final Roof Inspection:

1. Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion.

2. Notify Architect and Owner 7 days in advance of date and time of inspection.

D. Repair or remove and replace components of roofing work where test results or inspections indicate that they do not comply with specified requirements. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.

3.09 PROTECTING AND CLEANING
A. Protect membrane roofing system from damage and wear during remainder of construction period.

B. Correct deficiencies in or remove membrane roofing system that does not comply with requirements; repair substrates; and repair or reinstall membrane roofing system to a condition free of damage and deterioration at time of acceptance by Owner.

C. Clean overspray and spillage from adjacent construction. Clean membrane and restore surface to like-new condition meeting solar reflectance requirements.

END OF SECTION

Page 1629 of 1716 ends

THIS PAGE INTENTIONALLY LEFT BLANK Page 1630 of 1716
SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 1 of 4
PART 1 GENERAL

1.01 SUMMARY
A. Provide metal flashings and sheet metal including accessories as required for complete weather tight installation.

B. Patch existing flashing and sheet metal as required by new construction.

C. Provide concealed sealants used in conjunction with installation of metal flashing and sheet metal.

D. Provide miscellaneous sheet metal flashing and reglets not provided by other trades or suppliers.

1. Where reglets are to be installed in conjunction with other work, provide in adequate time for installation.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Furnish literature for manufactured products.

C. Shop Drawings: Clearly indicate dimensioning, layout, general construction details including closures, flashings, locations and types of sealants, anchorages, and method of anchorage.

D. Samples: Furnish samples of typical metal flashing fabrication indicating standard soldered joints and edge conditions.

1.04 QUALITY ASSURANCE
A. Referenced Standards

1. California Building Code (CBC), Latest Edition

2. Sheet Metal and Air Conditioning Contractors National Association (SMACNA):

Architectural Sheet Metal Manual, Latest Edition

Page 1631 of 1716 ends

SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 2 of 4
B. Design Requirements: Allow for movement of components without causing buckling, failure of joint seals, undue stress on fasteners or other detrimental effects, when subject to 100-year seasonal temperature ranges.

C. Sheet metal fabricator and installer shall have a minimum five (5) years of experience with shop fabrication and installation of shop-fabricated roofing metal and flashings.

1.05 DELIVERY, STORAGE AND HANDLING
A. Provide strippable film protective covering on shop finished flashing materials to protect materials through shipping, fabrication and installation.

1.06 WARRANTY
A. Special Warranty: Provide for correcting failure of metal flashing system to resist penetration of water and damage from wind.

1. Special Warranty Period: Two years.

PART 2 PRODUCTS

2.01 MATERIALS
A. Flashing and Sheet Metal:

1. Minimum gauge of aluminum per SMACNA. Minimum gauge of gutters, downspouts and roof edge, .040 aluminum, 20ga.

B. Flexible Flashings: Reinforced self- adhered flexible flashing.

C. Solder and Fasteners: As recommended by SMACNA and complying with applicable codes and regulations; hot dipped galvanized minimum coating comparable to G90.

D. Concealed Sealant: Butyl type for use in conjunction with sheet metal; non-staining; noncorrosive; non-shrinking and non-sagging; ultra-violet and ozone resistant for exterior concealed applications.

E. Bituminous Paint: Acid and alkali resistant type; black color; asbestos free.

F. Plastic Cement: Cutback asphaltic type; asbestos free.

G. Sealing Compound: Type recommended by roofing manufacturer; asbestos free.

H. Gaskets: Type suitable for use in conjunction with sheet metal; non-staining, noncorrosive, non-shrinking, non-sagging, ultra-violet resistant, and ozone resistant; for exterior concealed applications.

1. Manufacturers:
a. Sandell Manufacturing Co./Polytite Joint Sealant.
b. Emseal USA, Inc./Emseal Secondary Seal.

Page 1632 of 1716 ends

SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 3 of 4

2.02 FABRICATION
A. Fabricate sheet metal in accordance with SMACNA Architectural Sheet Metal Manual.

B. Form sections square, true and accurate to size, free from distortion and other defects detrimental to appearance or performance.

C. Fabricate corners and intersections in shop with solder joints; watertight fabrication.

D. Form sections in maximum 10'-0" lengths; make allowance for expansion at joints.

E. Hem exposed edges on underside 1/2".

F. Backpaint flashings with heavy bodied bituminous paint where in contact with cementitious materials or dissimilar metals.

PART 3 EXECUTION

3.01 INSTALLATION
A. Install metal flashing and sheet metal in accordance with SMACNA Architectural Sheet Metal Manual.

1. Install tight in place, with corners square, surfaces true and straight in planes, and lines accurate to profiles as indicated on Drawings.

2. Lap joints in direction of water flow.

3. Install self-adhering flexible flashings and overlap metal flashing joints and adjacent materials in direction of water flow.

B. Exercise care when cutting materials on site, to ensure cuttings do not remain on finished surfaces.

C. Provide expansion joints concealed within system.

D. Use concealed fasteners, continuous cleat type, except where specifically approved by Architect.

1. Exposed fasteners may be used, where clearly indicated on shop drawings and approved by the Owner, at areas not exposed at exterior walls nor in sight of interior spaces.

E. Apply sealing compound at junction of metal flashing and felt flashing.

F. Lock seams and end joints; fit flashing tight in place; make corners square, surfaces true and straight in planes, and lines accurate to profiles.

G. Install flashings with minimum joints and as long of section as possible.

H. Install sealants where required to prevent direct weather penetration.

1. Install continuous gasket behind surface-applied reglets.

Page 1633 of 1716 ends

SECTION 07 62 00 SHEET METAL FLASHING AND TRIM
SHEET METAL FLASHING AND TRIM 07 62 00 - 4 of 4
I. Completed installation shall be free of rattles, noise due to thermal and air movement, and wind whistles.

J. Install metal flashing at all intersections to protect waterproofing, insulation and gypsum sheathing from UV exposure.

K. Install dam flashing at window, louvers, openings and at intersecting horizontal and vertical surfaces.

3.02 CLEANING
A. Remove protective coating from shop finished sheet metal when no longer required to protect roofing and flashing from construction.

B. Touch-up scratched and damaged finish to match new; remove and replace sheet metal units that cannot be repaired to look identical to adjacent sheet metal when viewed from 5'-0" away.

END OF SECTION

Page 1634 of 1716 ends

SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 1 of 4
PART 1 - GENERAL

1.1 SUMMARY
A. This section specifies the following materials and accessories as required for complete weathertight installation:

1. Copings.

1.2 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.3 SUBMITTALS
A. Product Data: For each type of product.

B. Samples: For each type of roof specialty and for each color and texture specified.

C. Product Test Reports: For tests performed by a qualified testing agency.

D. Sample warranty.

1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing specialties to include in maintenance manuals.

1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A qualified manufacturer offering products meeting requirements that are FM Approvals listed for specified class.

1.6 WARRANTY
A. Roofing-System Warranty: Roof specialties are included in warranty provisions in Section 07 54 23 - Thermoplastic Polyolefin (TPO) Roofing.

Page 1635 of 1716 ends

SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 2 of 4
B. Special Warranty on Painted Finishes: Manufacturer agrees to repair finish or replace roof specialties that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D2244. b. Chalking in excess of a No. 8 rating when tested according to ASTM D4214. c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.

2. Finish Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. FM Approvals' Listing: Manufacture and install copings that are listed in FM Approvals' "RoofNav" and approved for windstorm classification, Class 1-90 Identify materials with FM Approvals' markings.

B. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of thermal movements. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C) material surfaces.

2.2 COPINGS
A. Metal Copings: Manufactured coping system consisting of metal coping cap in section lengths not exceeding 12 feet (3.6 m), concealed anchorage; with corner units, end cap units, and concealed splice plates with finish matching coping caps.

1. Metallic-Coated Steel Sheet Coping Caps: Zinc-coated (galvanized) steel, nominal 0.034- inch (0.86-mm) thickness.
a. Surface: Smooth, flat finish.
b. Finish: Three-coat metallic fluoropolymer.
c. Color: Dark Bronze

2. Corners: Factory mitered and mechanically clinched and sealed watertight.

3. Coping-Cap Attachment Method: Face leg hooked to continuous cleat with back leg fastener exposed, fabricated from coping-cap material.
a. Face-Leg Cleats: Concealed, continuous stainless steel.

2.3 MATERIALS
A. Zinc-Coated (Galvanized) Steel Sheet: ASTM A653/A653M, G90 (Z275) coating designation.

Page 1636 of 1716 ends

SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 3 of 4
B. Stainless-Steel Sheet: ASTM A240/A240M or ASTM A666, Type 304.

2.4 MISCELLANEOUS MATERIALS
A. Fasteners: Manufacturer's recommended fasteners, suitable for application and designed to meet performance requirements, complying with FM Approvals 4470.

B. General: Adhesive and sealant materials recommended by roofing system manufacturer for intended use, identical to materials utilized in approved listed roofing system, and compatible with roofing membrane.

C. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2.5 FINISHES
A. Coil-Coated Galvanized-Steel Sheet Finishes:

1. High-Performance Organic Finish: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with ASTM A755/A755M and coating and resin manufacturers' written instructions.
a. Three-Coat Metallic Fluoropolymer: AAMA 621. Fluoropolymer finish with suspended metallic flakes containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL
A. General: Install roof specialties according to manufacturer's written instructions. Anchor roof specialties securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, underlayments, sealants, and other miscellaneous items as required to complete roof-specialty systems.

1. Install roof specialties level, plumb, true to line and elevation; with limited oil-canning and without warping, jogs in alignment, buckling, or tool marks.

2. Provide uniform, neat seams with minimum exposure of solder and sealant.

3. Install roof specialties to fit substrates and to result in weathertight performance. Verify shapes and dimensions of surfaces to be covered before manufacture.

4. Torch cutting of roof specialties is not permitted.

5. Do not use graphite pencils to mark metal surfaces.

B. Metal Protection: Protect metals against galvanic action by separating dissimilar metals from contact with each other or with corrosive substrates by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer.

1. Coat concealed side of stainless-steel roof specialties with bituminous coating where in contact with wood, ferrous metal, or cementitious construction.

2. Bed flanges in thick coat of asphalt roofing cement where required by manufacturers of roof specialties for waterproof performance.

Page 1637 of 1716 ends

SECTION 07 71 00 ROOFING SPECIALTIES
ROOFING SPECIALTIES 07 71 00 - 4 of 4
C. Expansion Provisions: Allow for thermal expansion of exposed roof specialties.

1. Space movement joints at a maximum of 12 feet (3.6 m) with no joints within 18 inches (450 mm) of corners or intersections unless otherwise indicated on Drawings.

2. When ambient temperature at time of installation is between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures.

D. Fastener Sizes: Use fasteners of sizes that penetrate substrate not less than recommended by fastener manufacturer to achieve maximum pull-out resistance.

E. Seal concealed joints with butyl sealant as required by roofing-specialty manufacturer.

F. Seal joints as required for weathertight construction. Place sealant to be completely concealed in joint. Do not install sealants at temperatures below 40 deg F (4 deg C).

3.2 COPING INSTALLATION
A. Install cleats, anchor plates, and other anchoring and attachment accessories and devices with concealed fasteners.

B. Anchor copings with manufacturer's required devices, fasteners, and fastener spacing to meet performance requirements.

1. Interlock face-leg drip edge into continuous cleat anchored to substrate at 16-inch (406- mm) centers. Anchor back leg of coping with screw fasteners and elastomeric washers at 16-inch (406-mm) centers.

3.3 CLEANING AND PROTECTION
A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder and sealants.

C. Remove temporary protective coverings and strippable films as roof specialties are installed.

END OF SECTION

Page 1638 of 1716 ends

SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 1 of 4
PART 1 GENERAL

1.01 SUMMARY
A. Provide labor, material, equipment and services to furnish and install firestopping systems required for the work as shown on the drawings, as specified herein and as required for a complete and proper installation, including, but not limited to, the following:

1. Closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.

2. Closures of openings in walls against penetration of gases or smoke in smoke partitions.

3. Sealants around penetrations in non-rated smoke barriers where indicated on Drawings.

4. Closures of floor openings in vertical mechanical shafts against penetration of flame, heat, smoke and gases.

B. Drawings and General Provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification Sections, apply to this Section.

1.02 RELATED SECTIONS
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Section 01 33 00 – Submittals.

B. Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.

C. List of FM, UL, or WH classification number of systems installed.

D. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.

1.04 DELIVERY AND STORAGE
A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.

B. Store in a location providing protection from damage and exposure to the elements.

1.05 QUALITY ASSURANCE
A. FM, UL, or WH or other approved laboratory tested products will be acceptable.

Page 1639 of 1716 ends

SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 2 of 4

1.06 APPLICABLE STANDARDS: The latest edition of publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.

A. American Society for Testing and Materials (ASTM):

1. E84 Surface Burning Characteristics of Building Materials

2. E136 Behavior of Material in a Vertical Tube Furnace

3. E814 Fire Tests of Through-Penetration Fire Stops
B. Factory Mutual Engineering and Research Corporation (FM):

1. Annual Issue Approval Guide Building Materials
C. Underwriters Laboratories, Inc. (UL):

1. Annual Issue Building Materials Directory

2. Annual Issue Fire Resistance Directory
D. Warnock Hersey (WH):

1. Annual Issue Certification Listings
PART 2 PRODUCTS

2.01 FIRESTOP SYSTEMS
A. Metallic Pipe of Conduits: Firestop systems shall comply with the following:

1. Classified for use with the particular type of penetrating material used.

2. Use either factory built (Firestop Devices) or field erected (through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke.

3. Tested through-penetration firestop systems and firestop devices in accordance with ASTM E814 using the "T" rating to maintain the same rating and integrity as the fire barrier being sealed.

4. Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier.

5. Firestop sealants used for firestopping or smoke sealing shall have following properties:
a. Contain no flammable or toxic solvents.
b. Have no dangerous or flammable outgassing during the drying or curing of products.
c. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.

Page 1640 of 1716 ends

SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 3 of 4
d. When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.

6. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84.

7. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.

8. Materials to be asbestos free.

B. Glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials:

Comply to requirements for metallic pipe and as follows:

1. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.

2. Intumescent products which expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant.

C. One-Hour Fire Barrier Sealant: One-component neutral-cure silicone rubber sealant.

1. Manufacturers:
a. 3M “Fire Barrier 2000 or 2003 Sealant, Caulk Type CP25 or No. 303 Putty”;
b. International Protective Coatings “Flame-Safe FS500 or FSP1000 Putty”; c. Fipro “A/D Silicone Firebarrier Sealant-SL”;
d. Or equal.

2. Two Hour Fire Barrier Sealant: 3M CP25 Sealant.

2.02 SMOKE STOPPING IN SMOKE PARTITIONS
A. Non-Fire-rated Smoke Stop Partitions: Sealants around penetrations in smoke stop partitions or barriers not identified on the plans as part of a rated assembly shall comply as follows:

1. Use silicone sealant in smoke partitions as specified in Section 07 90 00, Joint Sealers.

2. Use mineral fiber filler and bond breaker behind sealant.

3. Sealants shall have a maximum flame spread of 25 and smoke developed of 50 when tested in accordance with E84.

4. When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.

B. Fire-rated Smoke Stop Partitions: Sealants around penetrations in smoke stop partitions or barriers that are identified on the plans as part of a rated assembly shall comply as follows:

Page 1641 of 1716 ends

SECTION 07 84 00 FIRESTOPPING SYSTEMS
FIRESTOPPING SYSTEMS 07 84 00 - 4 of 4

1. Use listed firestop system specified above.

2.03 ACCESSORIES
A. Stuffing Material: Mineral fiber matting, permanent.

B. Retainers: Clips to support mineral fiber matting.

PART 3 EXECUTION

3.01 EXAMINATION
A. Submit product data and installation instructions, as required by article, submittals, after an on site examination of areas to receive firestopping.

B. Examine substrates and conditions for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of firestopping.

3.02 PREPARATION
A. Remove dirt, grease, oil, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.

B. Remove insulation on insulated pipe for a distance of six inches (150 mm) on either side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.

C. Install backing materials to arrest liquid material leakage.

3.03 INSTALLATION
A. Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.

B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.

C. Install smoke stopping seals in smoke partitions.

3.04 FIELD QUALITY CONTROL
A. Owner’s Fire Marshal will examine completed firestopping to determine, in general, if it is being installed in compliance with requirements.

B. Do not proceed to enclose firestopping with other construction until reports of Owner Fire Marshal’s examinations are issued.

C. Where deficiencies are found, repair or replace firestopping so that it complies with requirements.

3.05 CLEANING
A. Remove materials, litter, and debris.

B. Clean up spills of liquid type materials.

END OF SECTION 07 84 00

Page 1642 of 1716 ends

SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 1 of 5
PART 1 GENERAL

1.01 SUMMARY
A. Provide joint sealants, for interior and exterior joints not specified elsewhere, with backing rods and accessories as required for complete installation. Joint sealers include sealants and caulking as indicated.

1.02 RELATED WORK
A. All Related Documents and Sections: Contractor to examine Contract Documents for requirements that directly affect or are affected by Work of this Section. Those Documents and Sections include, but is not limited to, the following:

1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 General Requirements, apply to this Section.

2. All Specification Sections listed in the Table of Contents.

1.03 SUBMITTALS
A. Submit in accordance with Division 01, Submittals, Shop Drawings Product Data and Samples.

B. Product Data: Furnish manufacturer's descriptive literature.

C. Samples: Furnish samples of each type of exposed joint sealer in required colors.

D. Certifications:

1. Furnish manufacturer's certification joint sealers comply with Contract Documents and are suitable for Project applications.

2. Furnish certification indicating installers are trained in proper use of specified products, qualified, and familiar with proper installation techniques.

1.04 QUALITY ASSURANCE
A. Performance Requirements:

1. Select materials for compatibility with joint surfaces and indicated exposures.

2. Where not indicated, select modulus of elasticity and hardness or grade recommended by manufacturer for each application indicated.

3. Comply with applicable limitations on volatile organic compound (VOC) emissions.

B. Installer Qualifications: Firm with minimum five years successful experience on projects of similar type and size, using specified products.

1. Installers shall be familiar with proper application procedures to ensure maximum joint sealer expansion and contraction capabilities.

Page 1643 of 1716 ends

SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 2 of 5

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration period for use, cure time, and mixing instructions.

1.06 SITE CONDITIONS
A. Do not proceed with installation of joint sealers under unfavorable weather conditions.

B. Install elastomeric sealants when temperature is in lower third of temperature range recommended by manufacturer.

1.07 WARRANTY
A. Special Warranty: Repair or replace joint sealers which fail to perform as intended, because of leaking, crumbling, hardening, shrinkage, bleeding, sagging, staining and loss of adhesion.

PART 2 PRODUCTS

2.01 MATERIALS
A. Elastomeric Sealants:

1. Single-Component Low Modulus Silicone Sealant: ASTM C920 Type S, Class 25, Grade NS; minimum 50% expansion and compaction capability. a. Provide at exterior locations not exposed to traffic. b. Manufacturers:
1) General Electric Co./Silpruf, Silglaz or GESIL.
2) Dow Corning Corp./790 or 795.
3) Pecora Corp./864 Architectural Silicone.
4) Tremco/Spectrum 3.

2. Multi-Component Polyurethane Sealant: ASTM C920, Type M, Grade P, Class 25, self-leveling; minimum 25% expansion and compaction capability. a. Provide following at traffic bearing locations.
b. Manufacturers:
1) Pecora Corp./NR-200 Urexpan.
2) Tremco/Vulkem 245.
3) Sonneborn Division of ChemRex /SL 2

Page 1644 of 1716 ends

SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 3 of 5

3. Mildew-Resistant Silicone Rubber Sealant: ASTM C920, Type S, Grade NS, Class 25, compounded with fungicide, specifically for mildew resistance and recommended for interior joints in wet areas.
a. Provide at interior joints in wet areas.
b. Manufacturers:
1) General Electric Co./SCS 1702 Sanitary Sealant.
2) Dow Corning Corp./786 Bathtub Caulk.
3) Pecora Corp./863 #345 White.
4) Tremco/Tremsil 200.

B. Non-Elastomeric Sealants:

1. Acrylic-Emulsion Sealant: ASTM C834 acrylic or latex-rubber-modified acrylic sealant, permanently flexible, non-staining and non-bleeding; recommended for general interior exposure; compatible with paints specified in Section 09 90 00. a. Provide at general interior applications.
b. Manufacturers:
1) Pecora Corp./AC-20.
2) Sonneborn Division of ChemRex/Sonolac.
3) Tremco/Ultrem 1500
C. Miscellaneous Materials:

1. Primers/Sealers: Non-staining types recommended by joint sealer manufacturer for joint surfaces to be primed or sealed.

2. Joint Cleaners: Non-corrosive types recommended by joint sealer manufacturer; compatible with joint forming materials.

3. Bond Breaker Tape: Polyethylene tape as recommended by joint sealer manufacturer where bond to substrate or joint filler must be avoided for proper performance of joint sealer.

4. Sealant Backer Rod: Compressible polyethylene foam rod or other flexible, permanent, durable non-absorptive material as recommended by joint sealer manufacturer for compatibility with joint sealer.
a. Oversize backer rod minimum 30% to 50% of joint opening.

D. Colors: Provide colors indicated or as selected by Architect from manufacturer's full range of colors.

PART 3 EXECUTION

Page 1645 of 1716 ends

SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 4 of 5

3.01 PREPARATION
A. Prepare joint surfaces in accordance with ASTM C1193 and as recommended by joint sealer manufacturer.

B. Clean joint surfaces immediately before installation of joint sealer; remove dirt, insecure materials, moisture and other substances which could interfere with bond of joint sealer.

C. Prime or seal joint surfaces where recommended by joint sealer manufacturer; do not allow primer/sealer to spill or migrate onto adjoining surfaces.

D. Ensure protective coatings on surfaces in contact with joint sealers have been completely stripped.

3.02 INSTALLATION
A. Comply with manufacturer's printed instructions and ASTM C1193, except where more stringent requirements are shown or specified.

B. Set sealant backer rods at proper depth or position in joint to coordinate with other work, including installation of bond breakers and sealant; do not leave voids or gaps between ends of backer rods.

1. Do not stretch, twist, puncture or tear backer rods.

C. Install bond breaker tape where required by manufacturer's recommendations to ensure joint sealers will perform properly.

D. Size materials to achieve required width/depth ratios.

E. Employ installation techniques that will ensure joint sealers are deposited in uniform, continuous ribbons without gaps or air pockets, with complete "wetting" of bond surfaces equally on opposite sides.

F. Joint Configuration: Fill sealant joint to a slightly concave surface, slightly below adjoining surfaces, unless otherwise indicated.

G. Where horizontal joints are between a horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap moisture or dirt.

H. Install joint sealers to depths recommended by joint sealer manufacturer but within the following general limitations, measured at center (thin) section of bead.

1. Horizontal Joints: 75% width with minimum depth of 3/8".

2. Elastomeric Joints: 50% width with minimum depth of 1/4".

3. Non-Elastomeric Joints: 75% to 125% of joint width.

I. Spillage: Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to migrate into voids of adjoining surfaces.

1. Clean adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage.

Page 1646 of 1716 ends

SECTION 07 90 00 JOINT SEALANTS
JOINT SEALANTS 07 90 00 - 5 of 5
J. Cure joint sealers in compliance with manufacturer's instructions and recommendations to obtain high early bond strength, internal cohesive strength and surface durability.

K. Maintain finished joints free of embedded matter, ridges and sags.

END OF SECTION

Page 1647 of 1716 ends
Page 1 of 3 ends

Agenda Item No: 14.a.

MEETING DATE/TIME: 9/17/2025

ITEM NO: 2025-703

AGENDA SUMMARY REPORT
SUBJECT: Possible Introduction of Camping Ordinance Amendment by Title Only.

DEPARTMENT: City Attorney PREPARED BY: Darcy Vaughn, Assistant City Attorney PRESENTER: Darcy Vaughn, Assistant City Attorney
ATTACHMENTS:

1. Camping Ordinance Amendment Redline

2. Camping Ordinance Amendment Clean

3. Mendocino County Homeless Encampment Coordination Protocol

4. 14a Correspondence Received - Mazie Malone

5. 14a Correspondence Received - Rayna Matthews

6. 14a Correspondence Received - Laura Diamondstone

7. 14a Correspondence Received - Megan Wolf

8. 14a Correspondence Received - Josie Slovut

9. 14a Correspondence Received - Amelia Taylor

10. 14a Correspondence Received - Maureen Taylor

11. 14a Correspondence Received - Cecelia Sullivan

12. 14a Correspondence Received - Clarice Sargenti
Summary: The City Council will consider introducing by title only a Camping Ordinance Amendment that responds to City of Grants Pass v. Johnson and incorporates elements of the State's Model Encampment Ordinance.

Background: The U.S. Supreme Court ruling in City of Grants Pass v. Johnson issued on June 28, 2024, centered around a local jurisdiction’s ability to enforce a ban on public camping when sufficient shelter for unhoused individuals is not available. The ruling reversed a Ninth Circuit decision that prohibited local restrictions on public camping as unconstitutional cruel and unusual punishment under the Eighth Amendment, unless the person was provided access to adequate temporary shelter. This ruling allows local jurisdictions greater latitude to enforce anti-camping rules even when alternative shelter is not offered to the unhoused individual. The City of Ukiah's current City Code provisions prohibiting public camping were adopted in February 2019 and reflect the previous Ninth Circuit limitations on the authority state and local government entities to enforce public camping prohibitions. These limiting regulations are no longer required in light of the Supreme Court ruling.

On July 25, 2024, in response to the Supreme Court's holding that states and their subdivisions can take reasonable actions to clear encampments, the Governor of the State of California signed Executive Order N-1- 24, which directed state agencies to develop policies to prioritize addressing encampments on state property while providing reasonable advance notice and partnering with shelter and services providers. Executive Order N-1-24 also encouraged local governments to adopt similar policies, and to use all available resources and infrastructure, including the historic resources provided by the State, to take urgent action to humanely remove encampments from public spaces.

On May 12, 2025, the Governor released a model ordinance (“Model Ordinance”) for cities and counties to address unhealthy and dangerous encampments and which follows and builds on the Executive Order N-1-24

Page 1648 of 1716 ends
Page 2 of 3 ends

by providing model methods to local jurisdictions to quickly address encampments and use state and local funding to connect people experiencing homelessness with the care and support they need.

Discussion: In response to the Supreme Court's decision in City of Grants Pass v. Johnson and the Governor's Executive Order N-1-24 and Model Ordinance for addressing the public health and safety issues posed by public camping and encampments, City staff propose a number of amendments to the current City Code provisions prohibiting public camping. The proposed Camping Ordinance Amendment is attached to this staff report in redline as Attachment 1 and as a clear version in Attachment 2. The Ordinance includes the following changes to the current anti-camping provisions in the City Code:

1. The Ordinance removes the requirement that the public camping provisions can be enforced only if shelter space is available and the individual who is camping in the public right of way in violation of the Ordinance refuses to use the shelter space. In addition, the Ordinance removes a number of provisions that were intended to limit public camping to certain hours, locations, and encampment size in the event that the lack of available shelter space made enforcement of the Ordinance impossible. Finally, the Ordinance requires that Ukiah Police Department officers or other City officials who are delegated the authority to enforce the Ordinance make reasonable efforts to assist an individual who is violating the Ordinance to find alternate shelter and supportive services.

2. The Ordinance authorizes the Chief of the Ukiah Police Department to delegate enforcement authority to other City officials.

3. The Ordinance adds an explicit prohibition on camping in the public right of way, in a manner that impedes passage within the meaning of the Americans with Disabilities Act.

While the Model Ordinance sets forth required procedures for enforcement of public camping prohibitions that are intended to prevent unconstitutional enforcement of such provisions, the Camping Ordinance Amendment retains the City's current approach, which requires the Ukiah Police Department to "adopt a policy establishing procedures to be followed . . . in the enforcement of [the Ordinance] that prevent [the Ordinance] from being enforced in an arbitrary or discriminatory manner and that prevent the violation of the constitutional right to due process and to be free from unreasonable search or seizure." Furthermore, while the Model Ordinance outlines procedures for collecting and retaining personal property collected at encampment sites, the Camping Ordinance Amendment retains the City Council's authority and responsibility to set such procedures by resolution. The Ukiah Police Department and Mendocino County Department of Social Services recently adopted an updated Homeless Encampment Coordination Protocol (Attachment 3) that is intended, in part, to ensure constitutional enforcement of the City's public camping prohibition and to set forth procedures for collecting and storing personal property collected from camp sites and encampments while preventing health and safety threats to City and County officials changed with collecting and storing such personal property.

Staff recommends Council introduce by title only the Camping Ordinance Amendment.

Recommended Action: Introduce by title only the Camping Ordinance Amendment.

BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: Yes / No GRANT: Yes / No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Tom Corning, Ukiah Police Department; Craig Schlatter, Community Services STRATEGIC PLAN (SP): N/A
CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): N/A

Page 1649 of 1716 ends
Page 3 of 3 ends
Page 1650 of 1716 ends
Page 1 of 6 ends

ORDINANCE NO.X
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING DIVISION 7, CHAPTER 1, ARTICLE 8 OF THE UKIAH CITY CODE, ENTITLED “CAMPING” TO REFLECT GUIDANCE PROVIDED BY STATE OF CALIFORNIA IN ITS “MODEL ORDINANCE: ADDRESSING ENCAMPMENTS WITH URGENCY AND DIGNITY.” The City Council of the City of Ukiah hereby ordains as follows:

SECTION ONE. FINDINGS AND DECLARATION OF INTENT

1. Unauthorized overnight camping in the City poses significant risks to public health and safety, including environmental damage.

2. Such camping can expose the campers to crimes from which they would be protected, if they were camping in designated campgrounds or facilities.

3. Unauthorized overnight camping occurs where proper sanitation and cooking facilities are not available resulting in unhealthful and unsanitary conditions.

4. Unauthorized overnight camping in the floodway results in trash, human waste and food waste being deposited in close proximity to creeks, streams and rivers. These waterways are used for recreation and drinking water and support fish and wildlife.

5. Unauthorized overnight camping and the storage of camping paraphernalia on public property interferes with the general public’s access and use of such property for the purposes for which it is intended.

6. Unauthorized overnight camping and the adverse impacts from such activity pose a significant public health and environmental problem in the City.

7. After the United States Supreme Court’s decision in Grants Pass v. Johnson clarified that states and their subdivisions can take reasonable actions to clear encampments, the Governor of the State of California signed Executive Order N-1-24, which directed state agencies to develop policies to prioritize addressing encampments on state property while providing reasonable advance notice and partnering with shelter and services providers.

8. Executive Order N-1-24 also encouraged local governments to adopt similar policies, and to use all available resources and infrastructure, including the historic resources provided by the State, to take urgent action to humanely remove encampments from public spaces.

9. On May 12, 2025, the Governor released a model ordinance (“Model Ordinance”) for cities and counties to address unhealthy and dangerous encampments and which follows and builds on the Executive Order N-1-24 by providing model methods to local jurisdictions to quickly address encampments and use state and local funding to connect people experiencing homelessness with the care and support they need.

10. By adopting these amendments to the City’s Camping regulations, the City Council intends to update the application of camping restrictions in the City to reflect the legal effects of Grants Pass v. Johnson and to incorporate elements of the Model Ordinance that will enhance the City’s ability to humanely remove encampments from public spaces, to provide care and support to people experiencing homelessness, and to protect public health and safety and to keep public property accessible and useful to the general public for the purposes for which it was acquired and is maintained.

Attachment 1

Page 1651 of 1716 ends
Page 2 of 6 ends

SECTION TWO.

Article 8, entitled “Camping” in Division 7, Chapter 1 of the Ukiah City Code is hereby amended to read as follows (unchanged text is omitted and is shown by “* * *”):

ARTICLE 8. CAMPING
SECTION:
§6080: Definitions
§6081: Unlawful Camping
§6082: Special Event Permit
§6083: Storage of Personal Property on Public or Private Property §6084: Penalty for Violation
§6085: Enforcement
§6080 DEFINITIONS
The following words shall have the following meanings, when used in this article, unless the context clearly indicates otherwise:

CAMP FACILITIES: Tents, tent-like shelter, tarpaulins, huts, or temporary or permanent structures, when placed on public or private property for the purpose of camping or when used on public or private property to camp. Camp facilities also include recreational or motor vehicles used as camp facilities.

CAMP PARAPHERNALIA: Bedrolls, blankets, tarpaulins, cots, beds, sleeping bags, tents, hammocks, mattresses, sleeping pads, portable stoves, barbecues, grills, cooking pots, or similar equipment when placed on public or private property for the purpose of camping or when used to camp. Camp paraphernalia also includes other personal property, when used or stored with camp paraphernalia as described herein.

CAMP SITE: The physical area on public or private property occupied by camp facilities and/or camp paraphernalia for purposes of camping.

ESTABLISH: Setting up or moving camp facilities, camp paraphernalia or other equipment, supplies or materials onto public or private property to camp or make ready to camp.

FLOODWAY: The area designated as "floodway" on the Flood Boundary Floodway Map issued by the Federal Emergency Management Authority ("FEMA") for the City of Ukiah, regardless of ownership, and any other area within fifty feet (50') of the top of the bank of any creek, stream, river or drainage facility the purpose of which is to channel water to a creek, stream or river.

MAINTAIN: Keeping or permitting camp facilities, camp paraphernalia or other equipment, supplies or materials to remain on public or private property to camp or make ready to camp.

MOTOR VEHICLE: A self-propelled car, truck or van or other motorized vehicle that can carry two (2) or more persons within an enclosed or enclosable portion thereof.

OCCUPY: To be physically present and/or reside at a camp site.

OPERATE: Participating or assisting in establishing or maintaining a camp or camp facility.

Page 1652 of 1716 ends
Page 3 of 6 ends

PERMANENT: When used in reference to a camp site, camp facilities, camp paraphernalia or other equipment, supplies or materials: any camp facility, camp paraphernalia or other equipment, supplies or materials that cannot be broken down, packed up, and removed from a camp site as readily as a tent or tentlike structure, as commonly used for temporary recreational camping.

PRIVATE PROPERTY: Real property that is not public property, including, but not limited to, streets, sidewalks, and improved or unimproved land.

PUBLIC PROPERTY: Real property that is open to the public and owned by a government body or agency such as, but not limited to, the Federal government, the State of California, the County of Mendocino, the City of Ukiah, and special districts, regardless of the form of ownership, including, but not limited to, streets, sidewalks, and improved or unimproved land and parks.

RECREATIONAL OR MOTOR VEHICLES USED AS CAMP FACILITIES: Recreational or motor vehicles when placed on public or private property to camp.

RECREATIONAL VEHICLE: As defined in California Health and Safety Code section 18010.

RECREATIONAL VEHICLE PARK OR MOBILE HOME PARK: Any area of land within the City licensed pursuant to the California Health and Safety Code as a mobile home park, as defined in California Health and Safety Code section 18214, or a special occupancy park as defined in California Health and Safety Code section 18862.43, which has a currently effective city business license, and in which space is rented or held out for camping.

SIDEWALK: Any area of public property adjacent to a street, or within a parking lot, whether improved or unimproved, and commonly intended or designed for pedestrian use.

STORE: To put aside or accumulate for use when needed, to put for safekeeping, to place or leave in a location.

STREET: A street, alley, way or place of whatever nature, publicly or privately maintained for purposes of vehicular travel. "Street" includes highway, as that term is defined in the California Vehicle Code.

TO CAMP or CAMPING: The occupation of a camp site, either in the open air or using camp facilities and camp paraphernalia, including to place, pitch, or use, as applicable, camp facilities or camp paraphernalia for such purposes.
§6081 UNLAWFUL CAMPING
Except as provided in this article, it is unlawful and a public nuisance for any person to camp, or to establish, maintain, operate or occupy a camp site, camp facilities, or use camp paraphernalia in or upon the areas listed in subsections A through F G of this section:

A. Any public park except as provided for in section 1967 of this code; B. Any sidewalk;
C. Any public right of way, in a manner that impedes passage within the meaning of the Americans with Disabilities Act.

CD. Any street except for recreational or motor vehicles used as camp facilities that are legally parked and do not remain parked longer than the posted time limit, if any, or twelve (12) hours, whichever is less;

Page 1653 of 1716 ends
Page 4 of 6 ends

DE. Any other public property except as otherwise permitted in this article; EF. Any floodway whether on public or private property; FG. Any private property, except when permitted under subsection G H of this section.

GH. The prohibitions on camping do not apply to:

1. Camping on private residential property by friends or family of the property owner or person in lawful possession of the property, so long as the owner or lawful occupant consents, and the camping does not create a public or private nuisance;

2. Mobile home parks and special occupancy parks or other locations where camping is specifically allowed under the Ukiah City Code;

3. Camping on public or private property in connection with a special event, when authorized pursuant to section 6082 of this code.

H. No person shall be in violation of the general prohibition on camping on public property contained in subsection D of this section unless:

1. The person is informed of the location of homeless shelters currently in operation in the City or outside of but within one mile of the City limits;

2. Such shelter is actually available to the person; and

3. The person voluntarily refuses to utilize or sleep in such shelter.

I. Even if the prohibition on camping does not apply, because the requirements set forth in subsection H of this section are not met, establishment, maintenance, operation or occupation of camp facilities is prohibited between the hours of seven o’clock (7:00) A.M. and ten o’clock (10:00) P.M. and constitutes a violation of this section, except as otherwise permitted herein.

J. Even if the prohibition on camping does not apply, because the requirements set forth in subsection H of this section are not met, establishment, maintenance, operation or occupation of a camp site, camp facilities, or use of camp paraphernalia within an area larger than sixty-four (64) square feet per person is prohibited and constitutes a violation of this section, except as otherwise permitted herein.

KI. Recreational or motor vehicles used as camp facilities shall be allowed to occupy a space equal to the dimensions of the vehicle, if parking in the space is otherwise permitted under this code, but the establishment, maintenance, operation, or occupation of a camp, camp facilities, or use of camp paraphernalia outside the vehicle is prohibited and constitutes a violation of this section except as otherwise permitted herein.

LJ. Establishment, maintenance, operation or occupation of permanent camp facilities or camp paraphernalia for camping; attaching permanent structures to trees or other on-site fixtures and the associated installation of fencing or similar materials is prohibited and constitutes a violation of this section.
* * *
§6083 STORAGE OF PERSONAL PROPERTY ON PUBLIC OR PRIVATE PROPERTY

Page 1654 of 1716 ends
Page 5 of 6 ends

It is unlawful and a public nuisance for any person to store camp paraphernalia in the following areas:

A. Any public property;
B. Any floodway; or
C. Outside a structure on any private property without the prior written consent of the owner. §6084 ENFORCEMENT
A. The Ukiah Police Department shall adopt a policy establishing procedures to be followed by its officers, and any other City officials delegated with the authority to enforce this Article by the Chief of the Department, in the enforcement of this article that prevent this article from being enforced in an arbitrary or discriminatory manner and that prevent the violation of the constitutional right to due process and to be free from unreasonable search or seizure. The City Council shall adopt by resolution procedures for removing personal property from an area used for camping in violation of this article and provide an opportunity and procedure for any person to claim property removed by the City from a site used for camping in violation of this article.

B. Members of the Ukiah Police Department or any other City officials delegated with the authority to enforce this Article by the Chief of the Department shall make every reasonable effort to identify and offer shelter at an emergency shelter, navigation center, or other appropriate housing, and to offer supportive services, to persons who are camping in violation of this Article. * * *
SECTION THREE.

1. Publication: Within fifteen (15) days after its adoption, this Ordinance shall be published once in a newspaper of general circulation in the City of Ukiah. In lieu of publishing the full text of the Ordinance, the City may publish a summary of the Ordinance once 5 days prior to its adoption and again within fifteen (15) days after its adoption.

2. Effective Date: The ordinance shall become effective thirty (30) days after its adoption.

3. Severability: If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, is for any reason held to be invalid or unenforceable, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council of the City of Ukiah hereby declares that it would have adopted each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more other sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof be declared invalid or unenforceable.

Introduced by title only on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

Page 1655 of 1716 ends
Page 6 of 6 ends

ABSTAIN:

Adopted on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Kristine Lawler, CMC/City Clerk

Page 1656 of 1716 ends
Page 1 of 5 ends

ORDINANCE NO.X
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING DIVISION 7, CHAPTER 1, ARTICLE 8 OF THE UKIAH CITY CODE, ENTITLED “CAMPING” TO REFLECT GUIDANCE PROVIDED BY STATE OF CALIFORNIA IN ITS “MODEL ORDINANCE:

ADDRESSING ENCAMPMENTS WITH URGENCY AND DIGNITY.”
The City Council of the City of Ukiah hereby ordains as follows:

SECTION ONE. FINDINGS AND DECLARATION OF INTENT

1. Unauthorized overnight camping in the City poses significant risks to public health and safety, including environmental damage.

2. Such camping can expose the campers to crimes from which they would be protected, if they were camping in designated campgrounds or facilities.

3. Unauthorized overnight camping occurs where proper sanitation and cooking facilities are not available resulting in unhealthful and unsanitary conditions.

4. Unauthorized overnight camping in the floodway results in trash, human waste and food waste being deposited in close proximity to creeks, streams and rivers. These waterways are used for recreation and drinking water and support fish and wildlife.

5. Unauthorized overnight camping and the storage of camping paraphernalia on public property interferes with the general public’s access and use of such property for the purposes for which it is intended.

6. Unauthorized overnight camping and the adverse impacts from such activity pose a significant public health and environmental problem in the City.

7. After the United States Supreme Court’s decision in Grants Pass v. Johnson clarified that states and their subdivisions can take reasonable actions to clear encampments, the Governor of the State of California signed Executive Order N-1-24, which directed state agencies to develop policies to prioritize addressing encampments on state property while providing reasonable advance notice and partnering with shelter and services providers.

8. Executive Order N-1-24 also encouraged local governments to adopt similar policies, and to use all available resources and infrastructure, including the historic resources provided by the State, to take urgent action to humanely remove encampments from public spaces.

9. On May 12, 2025, the Governor released a model ordinance (“Model Ordinance”) for cities and counties to address unhealthy and dangerous encampments and which follows and builds on the Executive Order N-1-24 by providing model methods to local jurisdictions to quickly address encampments and use state and local funding to connect people experiencing homelessness with the care and support they need.

10. By adopting these amendments to the City’s Camping regulations, the City Council intends to update the application of camping restrictions in the City to reflect the legal effects of Grants Pass v. Johnson and to incorporate elements of the Model Ordinance that will enhance the City’s ability to humanely remove encampments from public spaces, to provide care and support to people experiencing homelessness, and to protect public health and safety and to keep public property accessible and useful to the general public for the purposes for which it was acquired and is maintained.

Attachment 2

Page 1657 of 1716 ends
Page 2 of 5 ends

SECTION TWO.

Article 8, entitled “Camping” in Division 7, Chapter 1 of the Ukiah City Code is hereby amended to read as follows (unchanged text is omitted and is shown by “* * *”):

ARTICLE 8. CAMPING
SECTION:
§6080: Definitions
§6081: Unlawful Camping
§6082: Special Event Permit
§6083: Storage of Personal Property on Public or Private Property §6084: Penalty for Violation
§6085: Enforcement
§6080 DEFINITIONS
The following words shall have the following meanings, when used in this article, unless the context clearly indicates otherwise:

CAMP FACILITIES: Tents, tent-like shelter, tarpaulins, huts, or temporary or permanent structures, when placed on public or private property for the purpose of camping or when used on public or private property to camp. Camp facilities also include recreational or motor vehicles used as camp facilities.

CAMP PARAPHERNALIA: Bedrolls, blankets, tarpaulins, cots, beds, sleeping bags, tents, hammocks, mattresses, sleeping pads, portable stoves, barbecues, grills, cooking pots, or similar equipment when placed on public or private property for the purpose of camping or when used to camp. Camp paraphernalia also includes other personal property, when used or stored with camp paraphernalia as described herein.

CAMP SITE: The physical area on public or private property occupied by camp facilities and/or camp paraphernalia for purposes of camping.

ESTABLISH: Setting up or moving camp facilities, camp paraphernalia or other equipment, supplies or materials onto public or private property to camp or make ready to camp.

FLOODWAY: The area designated as "floodway" on the Flood Boundary Floodway Map issued by the Federal Emergency Management Authority ("FEMA") for the City of Ukiah, regardless of ownership, and any other area within fifty feet (50') of the top of the bank of any creek, stream, river or drainage facility the purpose of which is to channel water to a creek, stream or river.

MAINTAIN: Keeping or permitting camp facilities, camp paraphernalia or other equipment, supplies or materials to remain on public or private property to camp or make ready to camp.

MOTOR VEHICLE: A self-propelled car, truck or van or other motorized vehicle that can carry two (2) or more persons within an enclosed or enclosable portion thereof.

OCCUPY: To be physically present and/or reside at a camp site.

OPERATE: Participating or assisting in establishing or maintaining a camp or camp facility.

Page 1658 of 1716 ends
Page 3 of 5 ends

PERMANENT: When used in reference to a camp site, camp facilities, camp paraphernalia or other equipment, supplies or materials: any camp facility, camp paraphernalia or other equipment, supplies or materials that cannot be broken down, packed up, and removed from a camp site as readily as a tent or tentlike structure, as commonly used for temporary recreational camping.

PRIVATE PROPERTY: Real property that is not public property, including, but not limited to, streets, sidewalks, and improved or unimproved land.

PUBLIC PROPERTY: Real property that is open to the public and owned by a government body or agency such as, but not limited to, the Federal government, the State of California, the County of Mendocino, the City of Ukiah, and special districts, regardless of the form of ownership, including, but not limited to, streets, sidewalks, and improved or unimproved land and parks.

RECREATIONAL OR MOTOR VEHICLES USED AS CAMP FACILITIES: Recreational or motor vehicles when placed on public or private property to camp.

RECREATIONAL VEHICLE: As defined in California Health and Safety Code section 18010.

RECREATIONAL VEHICLE PARK OR MOBILE HOME PARK: Any area of land within the City licensed pursuant to the California Health and Safety Code as a mobile home park, as defined in California Health and Safety Code section 18214, or a special occupancy park as defined in California Health and Safety Code section 18862.43, which has a currently effective city business license, and in which space is rented or held out for camping.

SIDEWALK: Any area of public property adjacent to a street, or within a parking lot, whether improved or unimproved, and commonly intended or designed for pedestrian use.

STORE: To put aside or accumulate for use when needed, to put for safekeeping, to place or leave in a location.

STREET: A street, alley, way or place of whatever nature, publicly or privately maintained for purposes of vehicular travel. "Street" includes highway, as that term is defined in the California Vehicle Code.

TO CAMP or CAMPING: The occupation of a camp site, either in the open air or using camp facilities and camp paraphernalia, including to place, pitch, or use, as applicable, camp facilities or camp paraphernalia for such purposes.
§6081 UNLAWFUL CAMPING
Except as provided in this article, it is unlawful and a public nuisance for any person to camp, or to establish, maintain, operate or occupy a camp site, camp facilities, or use camp paraphernalia in or upon the areas listed in subsections A through G of this section:

A. Any public park except as provided for in section 1967 of this code; B. Any sidewalk;
C. Any public right of way, in a manner that impedes passage within the meaning of the Americans with Disabilities Act.

D. Any street except for recreational or motor vehicles used as camp facilities that are legally parked and do not remain parked longer than the posted time limit, if any, or twelve (12) hours, whichever is less;

Page 1659 of 1716 ends
Page 4 of 5 ends

E. Any other public property except as otherwise permitted in this article; F. Any floodway whether on public or private property;
G. Any private property, except when permitted under subsection H of this section.

H. The prohibitions on camping do not apply to:

1. Camping on private residential property by friends or family of the property owner or person in lawful possession of the property, so long as the owner or lawful occupant consents, and the camping does not create a public or private nuisance;

2. Mobile home parks and special occupancy parks or other locations where camping is specifically allowed under the Ukiah City Code;

3. Camping on public or private property in connection with a special event, when authorized pursuant to section 6082 of this code.

I. Recreational or motor vehicles used as camp facilities shall be allowed to occupy a space equal to the dimensions of the vehicle, if parking in the space is otherwise permitted under this code, but the establishment, maintenance, operation, or occupation of a camp, camp facilities, or use of camp paraphernalia outside the vehicle is prohibited and constitutes a violation of this section except as otherwise permitted herein.

J. Establishment, maintenance, operation or occupation of permanent camp facilities or camp paraphernalia for camping; attaching permanent structures to trees or other on-site fixtures and the associated installation of fencing or similar materials is prohibited and constitutes a violation of this section.
* * *
§6083 STORAGE OF PERSONAL PROPERTY ON PUBLIC OR PRIVATE PROPERTY It is unlawful and a public nuisance for any person to store camp paraphernalia in the following areas:

A. Any public property;
B. Any floodway; or
C. Outside a structure on any private property without the prior written consent of the owner. §6084 ENFORCEMENT
A. The Ukiah Police Department shall adopt a policy establishing procedures to be followed by its officers, and any other City officials delegated with the authority to enforce this Article by the Chief of the Department, in the enforcement of this article that prevent this article from being enforced in an arbitrary or discriminatory manner and that prevent the violation of the constitutional right to due process and to be free from unreasonable search or seizure. The City Council shall adopt by resolution procedures for removing personal property from an area used for camping in violation of this article and provide an opportunity and procedure for any person to claim property removed by the City from a site used for camping in violation of this article.

Page 1660 of 1716 ends
Page 5 of 5 ends

B. Members of the Ukiah Police Department or any other City officials delegated with the authority to enforce this Article by the Chief of the Department shall make every reasonable effort to identify and offer shelter at an emergency shelter, navigation center, or other appropriate housing, and to offer supportive services, to persons who are camping in violation of this Article. * * *
SECTION THREE.

1. Publication: Within fifteen (15) days after its adoption, this Ordinance shall be published once in a newspaper of general circulation in the City of Ukiah. In lieu of publishing the full text of the Ordinance, the City may publish a summary of the Ordinance once 5 days prior to its adoption and again within fifteen (15) days after its adoption.

2. Effective Date: The ordinance shall become effective thirty (30) days after its adoption.

3. Severability: If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, is for any reason held to be invalid or unenforceable, such invalidity or unenforceability shall not affect the validity or enforceability of the remaining sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases of this Ordinance, or its application to any other person or circumstance. The City Council of the City of Ukiah hereby declares that it would have adopted each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the fact that any one or more other sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases hereof be declared invalid or unenforceable.

Introduced by title only on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Adopted on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Kristine Lawler, CMC/City Clerk

Page 1661 of 1716 ends

Attachment 3 SS-25-053

Page 1662 of 1716 ends
Page 1663 of 1716 ends
Page 1664 of 1716 ends
Page 1665 of 1716 ends
Page 1666 of 1716 ends
Page 1667 of 1716 ends

2 could be categorized as “occupying” or “operating” a camp. That turns necessary survival into a punishable offense.

Pushing people from sidewalks into jail, or into another sidewalk, is not care and not safety. Real solutions come from housing, treatment, and support, not criminalization.

I urge you to reject these changes and focus on policies that address the real causes of homelessness, rather than punishing those who are already vulnerable.

Sincerely,
Mazie Malone
Kind Hearts Initiative
Care Without Conditions

Page 1668 of 1716 ends
Page 1669 of 1716 ends
Page 1670 of 1716 ends
Page 1671 of 1716 ends
Page 1672 of 1716 ends
Page 1673 of 1716 ends
Page 1674 of 1716 ends
Page 1675 of 1716 ends
Page 1676 of 1716 ends
















 



 














 
 


 











 !  "#
$%

 












&



 '

 (

'

 

 ,-

(

Page 1677 of 1716 ends
Page 1 of 2 ends

Agenda Item No: 14.b.

MEETING DATE/TIME: 9/17/2025

ITEM NO: 2025-1020

AGENDA SUMMARY REPORT
SUBJECT: Introduction of an Ordinance by Title Only and Adoption of the Corresponding Resolution of the City of Ukiah Adopting the 2025 Edition of the California Fire Code, Part 9, With Amendments, as Well as the 2025 Edition of the California Wildland-Urban Interface Code, Part 7, Regulating and Governing the Safeguarding of Life and Property From Fire and Explosion, and Providing for the Issuance of Permits, and Repealing All Other Ordinances and Parts of Ordinances of the City of Ukiah Fire Prevention Code in Conflict Herewith.

DEPARTMENT: Fire PREPARED BY: Matt Keizer, Chief Building Official / Fire Code Official UVFD
PRESENTER: Matt Keizer, Chief Building Official, City of Ukiah / Fire Code Official, Ukiah Valley Fire Authority
ATTACHMENTS:

1. 2025 Fire Code Adoption Ordinance Red Line - updated 9/17/25

2. 2025 Fire Code Adoption Ordinance Clean

3. Resolution 2025-X Ukiah CC
Summary: The City of Ukiah will consider introducing an ordinance by title only to adopt the 2025 California Fire Code and the 2025 Wildland-Urban Interface (WUI) Code, and adopting a resolution establishing findings of fact and the need for modifications to the California Fire Code, if necessary.

Background: The California Fire Code is part of the California Building Standards Code, and a new edition is published every three years by order of the California State Legislature. These new building and fire standards take effect January 1, 2026, unless otherwise stipulated.

A city or district may establish more restrictive standards when reasonably necessary due to local climatic, geological, or topographical conditions. These findings of local conditions and adopted local standards must be filed with the California Building Standards Commission to become effective. Previous additions and amendments do not apply without appropriate adoption.

Discussion: The City of Ukiah has begun the process of adopting the updated 2025 California Fire Code and amending the City's current Fire Prevention Code Section to include the changes of the 2025 California Fire Code and other considerations to increase safety.

In an ongoing effort to provide more consistency in the application of the Fire Codes with the greater Ukiah Valley, the City of Ukiah shall work closely with the Ukiah Valley Fire Authority in the evaluation of the changes to the 2025 Fire Code and creating additions and amendments to address local issues. There are no significant additional amendments or requested changes to the 2025 Fire Code for this code cycle.

Staff requests Council introduce an Ordinance by title only (Attachment 1 - Redline and Attachment 2 - Clean) adopting the 2025 California Fire Code and the 2025 Wildland-Urban Interface Code, and adopting a Resolution (Attachment 3) establishing the findings of fact, including additions or amendments, to address local conditions.

Page 1678 of 1716 ends
Page 2 of 2 ends

Recommended Action: Introduce an Ordinance by title only adopting the 2025 California Fire Code and the 2025 Wildland-Urban Interface Code, and adopt a Resolution establishing the findings of fact, including additions or amendments, to address local conditions.

BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: No GRANT: No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
STRATEGIC PLAN (SP): SP 1B - Provide services that support a high quality of life for all residents, including fostering diverse, inclusive, sustainable, and accessible neighborhoods.

CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): GP-A6 - Safety Element, Policy 5-7- Fire Code Compliance.

Page 1679 of 1716 ends

Updated 9/17/25 to show edits

Page 1680 of 1716 ends
Page 1681 of 1716 ends
Page 1682 of 1716 ends
Page 1683 of 1716 ends
Page 1684 of 1716 ends
Page 1685 of 1716 ends
Page 1686 of 1716 ends
Page 1687 of 1716 ends
Page 1688 of 1716 ends
Page 1689 of 1716 ends
Page 1690 of 1716 ends
Page 1691 of 1716 ends
Page 1692 of 1716 ends
Page 1693 of 1716 ends
Page 1694 of 1716 ends
Page 1695 of 1716 ends
Page 1696 of 1716 ends
Page 1697 of 1716 ends
Page 1 of 10 ends

ORDINANCE NO. 2025-X
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UKIAH AMENDING DIVISION 6, CHAPTER 3, ARTICLES 1 AND 3 OF THE UKIAH CITY CODE, ENTITLED: FIRE PREVENTION CODE.

The City Council of the City of Ukiah hereby ordains as follows:

SECTION ONE.

Article 1 of Chapter 3 in Division 6 of the Ukiah City Code is hereby amended to read as follows (unchanged text is omitted and is shown by “* * *”):
§5200 ADOPTION OF CALIFORNIA FIRE CODE AND THE WUI CODE.

A certain document, three (3) copies of which are on file in the office of the City Clerk of the City of Ukiah, being marked and designated as the California Fire Code, 2025 Edition, including Appendix Chapter 4 and Appendices B, BB, C, CC, D, E, F, G, H, I, K, N and O as published by the International Code Council, as well as the 2025 edition of the California Wildland-Urban Interface Code (WUI), including Appendix A, B, and F as published by the International Code Council is hereby adopted as the Fire Code of the City of Ukiah, in the State of California regulating and governing the safeguarding of life and property from fire and explosion hazards arising from the storage, handling and use of hazardous substances, materials and devices, and from conditions hazardous to life or property in the occupancy of buildings and premises as herein provided; providing for the issuance of permits and collection of fees therefor; and each and all of the regulations, provisions, penalties, conditions and terms of said Fire Code on file in the office of the City Clerk are hereby referred to, adopted, and made part hereof, as if fully set out in this section, with the additions, insertions, deletions, and changes, if any, prescribed in Division 6, Chapter 3, Articles 2 and 3 of this code. §5200.5 INSERTIONS INTO CERTAIN SECTIONS OF THE CALIFORNIA FIRE CODE 2025 EDITION AND THE CLAIFORNIA WILDLAND-URBAN INTERFACE CODE 2025 That the following sections of the 2025 edition of the California Wildland-Urban Interface Code are hereby amended and changed in the following respects:

Section 101.1 Title of Chapter 1 is amended to read as follows:
101.1 Title. These regulations shall be known as the California Wildland-Urban Interface Code of the City of Ukiah, hereinafter referred to as “this code.” Section 103.1 Creation of agency. The City of Ukiah is hereby created, and the official in charge there of shall be known as the Fire Code Official. The function of this agency shall be the implementation, administration, and enforcement of the provisions of this code.

The following sections of the California Fire Code, 2025 Edition, are hereby amended by inserting information specific to the City of Ukiah so that these sections read as follows:
101.1 Title. These regulations shall be known as the Fire Code of the City of Ukiah, hereinafter referred to as "this code."
Section 105.1, General, of Chapter 1 is amended to read as follows:
105.1 General. Permits shall be in accordance with Sections 105.1.1 through 105.6.25 or other Attachment 2

Page 1698 of 1716 ends
Page 2 of 10 ends

provisions of this code as required by the City of Ukiah.

Section 112, Board of Appeals Established, of Chapter 1 is amended to read as follows:
112.1 Board of Appeals Established. In order to hear and decide appeals of orders, decisions, or determinations made by the fire code official relative to the application and interpretation of this code, there shall be and is hereby created a Board of Appeals. The Board of Appeals shall be the Board of Directors of the Ukiah Valley Fire District or a subcommittee as appointed by the Board of Directors of the Ukiah Valley Fire District. The fire code official shall be an ex-officio member of said board but shall have no vote on any matter before the board. The board shall adopt rules of procedure for conducting its business and shall render all decisions and findings in writing to the Appellant with a duplicate copy to the fire code official.

Section 112.3, Qualifications, of Chapter 1 is deleted.

Section 112.5, Appeals Process, of Chapter 1 is added to read as follows:
112.5 Appeals Process. The appeals process for appeals of orders, decisions, or determinations made by the fire code official relative to the application and interpretation of this code shall be defined by sections 112.5.1 through 112.5.5.

Section 112.5.1, Initiating Appeal, of Chapter 1 is added to read as follows:

Section 112.5.1 Initiating Appeal. Any beneficially interested party has the right to appeal the order served by the fire code official by filing a written “NOTICE OF APPEAL” with the office of the fire code official within ten days after service of such order and upon payment of the sum of $150. In the event the order of the fire code official is overturned following the appeal, the fee shall be returned. The notice shall state the order appealed from, the identity and mailing address of the Appellant, and the specific grounds upon which the appeal is made.

Section 112.5.2, Stay of Order, of Chapter 1 is added to read as follows:

Section 112.5.2 Stay of Order. The timely filing of a properly completed notice of appeal shall have the effect of staying the implementation of the order appealed from until the final decision of the appeal.

Failure to file a timely notice of appeal waives any right to further challenge the order of the fire code official. “File” means delivered to the office of the fire code official at 300 Seminary Ln, Ukiah, California 95482.

Exception: Orders affecting acts or conditions which in the opinion of the fire code official, pose an immediate threat to life, property, or the environment as a result of panic, fire, explosion, or release are enforceable when made and are not stayed by the filing of a notice of appeal.

Section 112.5.3, Hearing of Appeal, of Chapter 1 is added to read as follows:

Section 112.5.3 Hearing of Appeal. Following is the process for establishing and hearing appeals:

The Board of Appeals, or the secretary thereof, shall set the matter to be heard at a date within thirty (30) days of receipt of such notice of appeal. Written notice of the time and place set for hearing shall be served on the Appellant by first class mail to the mailing address given in the notice of appeal. A hearing may not be conducted less than 20 days after notice is given to the applicant. The Board of Appeals may adopt rules governing the conduct of its hearings. Those rules shall include, at least,

Page 1699 of 1716 ends
Page 3 of 10 ends

the following:

1. The fire code official shall submit evidence at the hearing substantiating his/her decision. Such evidence may include testimony, fire district, police or other reports of the incident, witness statements, and other documents. Not less than 10 days prior to the scheduled hearing, the fire code official must notify the Appellant of the name, address, and phone number of any witness to the violation and furnish the Appellant with a copy of any document the fire code official intends to submit at the hearing. Not less than seven (7) days prior to the hearing, the Appellant may request the fire code official to produce at the hearing any witness he/she intends to rely upon to substantiate the violation. The written request must name the witness or witnesses who are requested to attend the hearing. The fire code official may not rely on the testimony of any witness (including such testimony contained in reports or written witness statements) whose appearance at the hearing is required by this subsection if that witness fails to appear.

2. Not less than 10 days prior to the hearing, the Appellant must notify the fire code official in writing of the name, address, and phone number of any witness the Appellant intends to call as a witness at the hearing, provide a brief description of the proposed testimony, and furnish the fire code official with a copy of any document the Appellant intends to offer as evidence at the hearing. The Appellant may not call any witness to testify at the hearing who was not identified as required by this subsection or offer any document as evidence at the hearing that was not provided to the fire code official as required by this subsection.

3. At the hearing, the Appellant may be represented by an attorney, at the Appellant’s expense. Both the fire code official and the Appellant shall have the right to examine and cross-examine any witness produced at the hearing. The rules of evidence that normally apply in court shall not apply in a hearing before the Board of Appeals, but it shall only consider evidence that would be relied upon by reasonable people making an important decision and shall disregard evidence that by its nature is unreliable or not credible.

4. The entire hearing shall be electronically or stenographically recorded. The Board of Appeals shall base its decision exclusively on the evidence presented at the hearing and shall issue a written decision, which includes a statement of the relevant facts that it finds to be true and explains how the facts support its decision. The record of the hearing shall be preserved for not less than six (6) months after the decision is served on the Appellant.

Section 112.5.4, Hearing Decision, of Chapter 1 is added to read as follows:

Section 112.5.4 Hearing Decision. The chairperson of the Board of Appeals shall issue the written decision required by subsection 4 of Section 112.4 Hearing of appeal.

The Board of Appeals may issue a decision affirming, modifying, or vacating the order of the fire code official. The decision shall be in writing and shall be served upon the Appellant by first class mail to the mailing address given in the notice of appeal. The hearing decision shall include notice of the Appellant’s right to seek review of the decision pursuant to California Code of Civil Procedure Sections 1094.5 and 1094.6.

Section 112.5.5, Finality of the Decision of the Board of Appeals, of Chapter 1 is added to read as follows:

Section 112.5.5 Finality of the Decision of the Board of Appeals. The decision of the Board of Appeals shall be the final decision for the District. The Board of Appeals shall have the power to continue any hearing and may, at its discretion, take the appeal under submission. The Board of Appeals shall render a decision not later than the seventh (7th) day following the date the matter was

Page 1700 of 1716 ends
Page 4 of 10 ends

taken under submission, and forthwith notify the interested parties as previously set forth.

Section 112.5.6, Appeal to Superior Court, of Chapter 1 is added to read as follows:

Section 112.5.6 Appeal to Superior Court. Judicial review of the decision of the Board of Appeals shall be governed by the Code of Civil Procedure Sections 1094.5 and 1094.6.

Section 112.5.7, Enforcement of Decision, of Chapter 1 is added to read as follows:

Section 112.5.7 Enforcement of Decision. Unless stayed by a court, any final decision of the Board of Appeals is effective immediately and may be implemented and enforced by the District. The remedies provided by this code are cumulative and in addition to any other remedies available at law or in equity.

1. Causing, permitting, aiding, abetting, or concealing a violation of any provision of this ordinance shall constitute a violation.

2. Violations of this code are hereby declared to be public nuisances.

3. A violation of this code constitutes a misdemeanor/infraction punishable by a fine of $1,000 or by imprisonment in the County jail for six months, or both.

4. In addition to other remedies provided by this ordinance or by other law, any violation of this ordinance may be remedied by a civil action brought by the District, including, for example, administrative or judicial nuisance abatement proceedings, other legally authorized enforcement proceedings, and suits for injunctive relief.

Section 113.4, Violation Penalties, of Chapter 1 is amended to read as follows:

Section 113.4 Violation Penalties. Persons who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter, repair or do work in violation of the approved construction documents or directive of the fire code official, or of a permit or certificate used under provisions of this code, shall be guilty of a misdemeanor/infraction. The first citation within a 12-month period, for violations of the Fire Code and any amendments adopted herein shall be treated as a Civil Penalty payable directly to the Ukiah Valley Fire District and is set at $250.00 plus the actual costs of all inspections required to gain compliance at the current rate set from time to time by the Ukiah Valley Fire District, per hour with a 1-hour minimum. Said civil penalties shall be a debt owed to the District by the person responsible for the violation within thirty (30) days after the date of mailing the citation unless an appeal is filed as provided in this section.

Upon failure to pay the civil penalty when due, the responsible person shall be liable for civil action brought by the Ukiah Valley Fire District for such penalty and costs of the litigation, including reasonable attorney’s fees.

Any subsequent citations within a twenty-four (24) month period for any violations of the Fire Code and any amendments adopted herein shall be misdemeanors/infractions and shall be subject to the penalties set forth herein, or a civil penalty shall be assessed in the sum of $500.00 plus the actual costs of all inspections required to gain compliance at the current rate set from time to time by the Ukiah Valley Fire District. The imposition of a penalty for any violation shall not excuse the violation or permit it to continue and all such persons shall be required to correct or remedy such violations or defects within a reasonable time. When not otherwise specified, each day that a violation occurs or continues, after a final notice has been delivered shall constitute a separate offense. The application

Page 1701 of 1716 ends
Page 5 of 10 ends

of both penalties shall be held to prevent the enforced correction of the prohibited condition. Nothing contained in this Section shall be construed or interpreted to prevent the Ukiah Valley Fire District from recovering all costs associated with a Fire District response as described in the Ukiah Valley Fire District’s current cost recovery ordinance, Ordinance 2004-1, or subsequent cost recovery ordinances.

Any violation of any provision of this Chapter shall constitute a public nuisance and shall entitle the Ukiah Valley Fire District to collect the costs of abatement and related administrative costs by a nuisance abatement lien as more particularly set forth in Government Code Section 38773.1, and by special assessment to be collected by the County Tax Collector as more particularly set forth in Government Code Section 38773.5. At least thirty (30) days prior to recordation of the lien, or submission of the report to the Tax Collector for collection of this special assessment, the record owner shall receive notice from the Chief of the Ukiah Valley Fire District of the intent to charge the property owner for all administrative costs associated with enforcement of this Ordinance and abatement of the nuisance. The notice shall include a summary of costs associated with enforcement of this Ordinance and abatement of the nuisance. The property owner may appeal the Chief’s decision to the Board of Directors of the Ukiah Valley Fire District within fifteen (15) days of the date of the notice and request a public hearing prior to recordation of the lien or submission of the report to the County Tax Collector for collection of the special assessment. In addition to the foregoing, the Ukiah Valley Fire District is authorized to prosecute a civil action to collect such abatement costs from the property owner or other person in possession or control of the affected property and shall be entitled to recover such abatement costs, together with the cost of litigation, including reasonable attorney’s fees.

Any person receiving a citation for a civil penalty pursuant to Section 113.4, Violation Penalties, of Chapter 1, may file an appeal per Section 112.5 through 112.7 of this code against the imposition of the civil penalty or response costs and expense.

Section 114.4, Failure to Comply, of Chapter 1 is amended to read as follows:

Section 114.4 Failure to Comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe conditions, shall be liable to a fine payable directly to the Ukiah Valley Fire District in the amount set at not less than $250.00 or more than $1000.00 plus the actual costs of all inspections required to gain compliance at the rate set from time to time by the Ukiah Valley Fire District, civil penalty shall be a debt owed to the District by the person responsible for the violation within thirty (30) days after the date of mailing of the citation unless an appeal is filed as provided for in Section 112.5.

Section 503 Fire Apparatus Access Roads in its entirety.

Section 503.3 MARKING, of Chapter 5 is hereby added to read as follows:

Section 503.3 MARKING. Where the fire code official determines that it is necessary to ensure adequate fire access, the fire code official may designate existing roadways as fire access roadways as provided by Vehicle Code section 22500.1 (public) or 22658(a) (private).

Section 503.4.2, Roadway Design Features, of Chapter 5 is hereby added to read as follows:

Section 503.4.2 Roadway Design Features. Roadway design features (speed bumps, speed humps, speed control dips, etc.) which may interfere with emergency apparatus responses shall not be installed on fire access roadways, unless they meet design criteria approved by the fire code official.

Page 1702 of 1716 ends
Page 6 of 10 ends

Section 505.1, Address Identification, of Chapter 5 is hereby amended to read as follows:

Section 505.1 Address Identification. Approved numbers and/or addresses shall be placed and maintained on all new and existing buildings and at appropriate additional locations as to be plainly visible and legible from the street or roadway fronting the property from either direction of approach. Said number shall contrast with their background and shall meet the minimum standards as to size: 4" high with a 0.5" stroke for residential buildings, 6' high and a 0.5" stroke for commercial and multi-residential buildings, 12" high with a 1" stroke for industrial buildings. Additional numbers shall be required where deemed necessary by the fire code official, such as rear access doors, building corners, and entrances to commercial centers. The fire code official may establish different minimum sizes for numbers for various categories of projects.

Section 505.3, Easement Address Signs, of Chapter 5 is hereby added to read as follows:

Section 505.3 Easement Address Signs. All easements, which are not named differently from the roadway from which they originate, shall have an address sign installed and maintained, listing all street numbers occurring on that easement, located where the easement intersects the named roadway. Minimum size of numbers on that sign shall be 4" in height with a minimum stroke of 0.5" and shall contrast with the background.

Section 505.4, Map Directories, of Chapter 5 is hereby added to read as follows:

Section 505.4 Map Directories. A lighted directory map, meeting current Fire District standards, shall be installed at each driveway entrance to multiple-unit residential projects and mobile home parks, where the numbers of units in such projects exceed 15.

Section 505.5, Response Map Updates, of Chapter 5 is hereby added to read as follows:

Section 505.5 Response Map Updates. Any new development, which necessitates updating of emergency response maps by virtue of new structures, hydrants, roadways or similar features, shall be required to provide map updates in a format (PDF and/or CAD format as approved by the fire code official) or compatible with current District mapping services, and shall be charged a reasonable fee for updating all response maps associated with this development.

Section 506.1 Key box where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life saving or firefighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL1037, and shall contain keys to gain necessary access as required by the fire code official.

Section 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers where required by the fire code official.

Section 506.2 Key Box Maintenance. The operator of the building shall immediately notify the fire code official and provide a new key where a lock is changed or rekeyed. The key to such lock shall be secured in the key box.

Section 506.3, Emergency Electrical Disconnects, of Chapter 5 is hereby added as follows:

Section 506.3 Emergency Electrical Disconnects. Where access to main electrical control panels requires entry to, and passage through, portions of a structure which may be involved with fire, smoke, gasses, hazardous materials, or which otherwise present unsafe conditions to emergency personnel, the fire code official may require that a means of remotely disconnecting electrical service to the

Page 1703 of 1716 ends
Page 7 of 10 ends

structure be provided. This means of remotely disconnecting electrical service shall be by a secured key switch mechanism approved by the Fire District.

Section 1201.4 Alternate Power Sources, of Chapter 12 is hereby added to read as follows:

Section 1201.4 Alternate Power Sources. All permanent installations of electrical generators, wind generators, or other power sources shall be approved by the building code official. All applicable provisions of the California Electrical Code, the California Plumbing Code, the California Building Code, the California Residential Code, and this Code shall be followed for any such installation.

Permanent engraved and affixed signage, red in color, reading "WARNING – This premises is provided with an Alternate Power source, Disconnection of commercial power may not disable the electric power source." Lettering shall be a minimum of 0.5" tall and shall be permanently affixed on each electrical panel subject to back-feed from alternate power sources. Any and all power disabling switches shall be clearly labeled.

Section 903.2, Where required, of Chapter 9 is hereby amended to read as herein provided. This section shall not amend the portion commencing and following Section 903.2.1.

Section 903.2 Where required. Approved automatic sprinkler systems in new, additions to existing, remodeled, added to or altered buildings and structures shall be provided in the locations described in this section.

A. Approved automatic sprinkler systems shall be provided in the new buildings and structures requiring a fire flow of 2000 gallons per minute (GPM) or greater as determined by Appendix B of this code.

B. Approved automatic sprinkler systems shall be provided in addition to existing structures where the new total building area would require a fire flow of 2,000 gallons per minute (GPM) or greater as determined by Appendix B of this code.

C. Approved automatic sprinkler systems shall be provided in existing structures where improvements occur during any three (3) year period which meet the definition of a “substantial remodel” and require a fire flow of 2,000 gallons per minute (GPM) or greater as determined by Appendix B of this code.

Exception: Projects that are solely complying with statutory regulations (examples may be Health and Safety Codes, earthquake/seismic, American Disabilities Act (ADA), or façade improvements) will not trigger this requirement.

D. Approved automatic sprinkler systems shall be provided in new structures exceeding 30 feet in height above the lowest grade level.

E. Approved automatic sprinkler systems shall be provided in those new, additions to existing, remodeled, added to, or altered buildings and structures which require a fire flow, as determined by Appendix B of this code, in excess of the capability of the available water supply.

F. Approved automatic sprinkler systems shall be installed per 903.3.1.3 in new mobile homes, and manufactured homes.

For purposes of this Section, “substantial remodel” shall mean the alteration of any structure which combined with any additions to the structure, performed within any three (3) year period, affects an area of work that exceeds fifty percent (50%) of the existing floor area of the structure. When any changes are made in the building, such as walls, columns, beams or girders, floor or ceiling joists

Page 1704 of 1716 ends
Page 8 of 10 ends

and coverings, roof rafters, roof diaphragms, foundations, piles or retaining walls, or similar components, the area of work for all rooms affected by such changes shall be included in computing floor areas for purposes of applying this definition. This definition does not apply to the replacement and upgrading of residential roof coverings or exterior wall finishes.

Definition: Area of work: (For the purpose of determining the square footage affected by a construction permit.) An area, where work activity takes place for which a permit is required plus 5 feet in all directions and does not include adjacent spaces where no work requiring a permit is being done.

Example: A 10 foot walls are moved that will take two spaces and turn them into one. The only area of work would be the wall plus five feet on either side. Total square footage 100 square foot assuming there is no other work being done that would require a permit in the same space.

Section 3307.5, Where required, of Chapter 33 is hereby amended to read as follows:

Section 3307.5 Where required. In buildings required to have standpipes by Section 905.3.1, not less than one standpipe shall be provided for use during construction. Such standpipes shall be installed during construction for each story above or below the first floor grade. Such standpipes shall be provided with Fire District hose connections at locations adjacent to stairways complying with Section 3307.1.2. Such standpipes shall be extended to the floor of the highest point of construction having secured decking or flooring.

Table B105.2, Buildings other than one- and two-family dwellings, of Appendix B, is hereby amended as follows:

AUTOMATIC

SPRINKLER SYSTEM
(Design Standard)

MINIMUM

FIRE FLOW
(gallons
per minute)

FLOW DURATION
(hours)
No automatic sprinkler system Value in
Table B105.1(2)
Duration in Table
B105.1(2)
Section 903.3.1.1 of the
California Fire Code
50% of the value
in Table
B105.1(2)a
Duration in Table
B105.1(2) at the
reduced flow rate
Section 903.3.1.2 of the
California Fire Code
50% of the value
in Table
B105.1(2)b
Duration in Table
B105.1(2) at the
reduced flow rate
Section BB105.1, Fire-Flow requirements for buildings, of Appendix BB is hereby amended as follows:

Section BB105.1 The minimum fire flow and flow duration for school buildings shall be specified in Table BB105.1.

Exception: A reduction in required fire flow of up to 50 percent is allowed when the building is provided with an approved sprinkler system.
§5201 DEFINITIONS

Page 1705 of 1716 ends
Page 9 of 10 ends

In the California Fire Code, herein adopted, the terms used therein shall comply with the common construction given to and usage of them in the City and as hereinafter defined. §5202 ENFORCEMENT
A. The California Fire Code (CFC) herein adopted shall be enforced by the Chief of the Ukiah Valley Fire District who is hereby appointed to supervise the Bureau of Fire Prevention and such regularly employed members of said District in accordance with the applicable provisions of the California Fire Code.

B. Section 104.3 of the California Fire Code is amended by adding subsection 104.3.2 thereto as follows:

For the purpose of providing and maintaining functions necessary for the prevention of fire and for the protection of life and property from fire and panic, there is hereby established a "self-inspection program" assuring that certain California building code (CBC) group B, F, H, L, M, and S occupancies within the city are inspected on an annual basis for fire safety.

The Ukiah Fire District shall deliver, by hand or by mail, "self-inspection worksheet" and "business and emergency record" forms as established from time to time by said District to certain CBC group B, F, H, L, M, & S occupancies within the city on an annual basis, or as may be initiated through the business license application process.

The owner or manager of said occupancy or person in highest authority in said occupancy shall be allowed thirty (30) days from issue date, as noted on the self-inspection worksheet, in which to conduct an inspection for fire safety, correct any deficiencies, complete said forms, and return completed forms to the Ukiah Valley Fire District as directed by the fire chief or his designee.

Any person who fails to comply with the requirements to return said forms duly completed and to correct the deficiencies noted in said occupancies within thirty (30) days of the issuance of said forms shall be guilty of an infraction, punishable by a fine of $100 for a first offense, $500 for a second offense and $1,000 for a third or subsequent offense.
§5223 GEOGRAPHIC LIMITS
The geographic limits referred to in certain section of the California Fire Code are hereby established as follows: 2025 edition of the California Fire Code are hereby established as follows:

Section 5704.2.9.6.1 The geographic limits referred to in Section 5704.2.9.6.1 of the 2025 edition of the California Fire Code in which storage of Class I, Class II, and liquids in outside above-ground tanks is prohibited are amended as follows: In all residential areas and in all heavily populated or congested commercial areas as established by the City of U County of Mendocino, and agricultural land of less than two (2) acres.

Section 5706.2.4.4 The geographic limits referred to in Section 5706.2.4.4 of the 2025 edition of the California Fire Code in which storage of Class I, Class II, and liquids in aboveground tanks is prohibited are amended as follows: In all residential areas and in all heavily populated or congested commercial areas as established by the County of Mendocino, and agricultural land of less than two (2) acres.

Page 1706 of 1716 ends
Page 10 of 10 ends

Section 5806.2 The geographic limits referred to in the 2025 edition of the California Fire Code in which the storage of flammable cryogenic fluids in stationary containers are prohibited, are hereby established as follows: In all residential areas and heavily populated or congested commercial areas, as established by the County of Mendocino.

Section 6104.2 The geographic limits referred to in Section 6104.2 of the 2025 edition of the California Fire Code in which storage of liquefied petroleum gas, the aggregate capacity of any one installation shall not exceed a water capacity of 2,000 gallons (7,570 liters), is restricted, are amended as follows: In all residential areas and in all heavily populated or congested commercial areas as established by the City of Ukiah.

SECTION TWO.

1. Publication: Within fifteen (15) days after its adoption, this Ordinance shall be published once in a newspaper of general circulation in the City of Ukiah. In lieu of publishing the full text of the Ordinance, the City may publish a summary of the Ordinance once 5 days prior to its adoption and again within fifteen (15) days after its adoption.

2. Effective Date: The ordinance shall become effective thirty (30) days after its adoption.

Introduced by title only on September 17, 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Adopted on , 2025, by the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Kristine Lawler, City Clerk

Page 1707 of 1716 ends
Page 1 of 5 ends

RESOLUTION 2025-X

RESOLUTION OF THE CITY OF UKIAH CITY COUNCIL ESTABLISHING FINDINGS OF FACT

AND NEED FOR CHANGES OR MODIFICATIONS TO THE STATE BUILDING STANDARDS

CODE BECAUSE OF LOCAL CONDITIONS
CHANGES OR MODIFICATIONS: Pursuant to Section 13869.7, 17958.5, 17958.7, 17922, and 18941.5 of the State of California Health and Safety Code, the City of Ukiah City Council in its ordinance adopting and amending the 2025 Edition of the California Fire Code with reference to the 2024 Edition of the International Fire Code, changes or modifies certain provisions of the 2025 California Building Standards Code (Title 24, Part 9) as it pertains to the regulation of buildings used for human habitation. A copy of the text of such changes or modifications is attached.

Findings: Pursuant to Sections 17958.5, 17958.7, 17922, and 18941.5 of the State of California Health and Safety Code, the City of Ukiah City Council has determined and finds that the attached changes or modifications to the 2025 California Building Standards Code are needed and are reasonably necessary because of local climatic, geographic, and topographic conditions.

Local Conditions: Local conditions have an adverse effect on the prevention of (1) major loss fires, (2) major earthquake damage, and (3) the potential for life and property loss, making necessary changes or modifications to the 2025 California Fire Code, 2024 International Fire Code and the 2025 California Building Standards Code in order to provide a reasonable degree of property security and fire and life safety in this Fire District.

Below are listed adverse local climatic (see No. 1), geographic, and topographic (see No. 2) conditions.

1. Climatic
a. Precipitation. Precipitation ranges from 13 to 71 inches per year with an average of approximately 37 inches per year. Approximately eighty-nine percent (89%) falls during the months of November through April, and eleven (11%) from May through October. b. Relative Humidity. Humidity generally ranges from 35% during daytime to 85% at night.

The humidity can drop to 12% or lower during the summer months. c. Temperatures. Temperatures have been recorded as high as 115 degrees F. Average summer highs are in the 86 to 91 degree range.
d. Winds. Prevailing winds are from the northwest. However, winds are experienced from virtually every direction at one time or another. Velocities are generally in the 3 – 18 mph range, gusting to 33 mph, particularly during the summer months. Extreme winds, up to 50 mph, have been known to occur.
e. Summary. These local climatic conditions affect the acceleration, intensity, and size of fire in the community. Times of little or no rainfall, of low humidity and high temperatures create extremely hazardous conditions, particularly as they relate to the ignition of structure fires which have the potential to burn into the vegetation (wildland), and vice versa. The winds experienced in this area can have a tremendous impact upon structure fires in buildings of close proximity to one another, commonly found in the residential neighborhoods throughout the Ukiah Valley. During structure, or wildland fires, winds can carry sparks and burning brands to other structures, thus spreading the fire and causing conflagrations. In building Attachment 3

Page 1708 of 1716 ends
Page 2 of 5 ends

fires, winds can literally force fire back into the building and create a blowtorch effect, in addition to preventing “natural” ventilation and cross-ventilation efforts.

2. Geographic and Topographic
a. The fire environment of a community is primarily a combination of two factors: the area’s physical geographic characteristics and the historic pattern of urban-suburban development.

These two factors, alone and combined, create a mixture of environments, which ultimately determines the area’s fire protection needs.

The basic geographical boundaries of the District include Nelson Ranch Road to the south, Cleland Mountain to the west, Gold Gulch to the north and Cow Mountain to the east.

Because of the size of the Ukiah Valley Fire District (98 square miles), the characteristics of the fire environment changes from one location to the next. Therefore, the District has not one, but a number of fire environments, each of which has its individual fire protection needs.

The service area of the Ukiah Valley Fire District has a varied topography and vegetative cover. A conglomeration of valley floor, mountainous slopes, and ridges make up the terrain. Development has occurred on the flat lands in the central portion of the District.

However, over the last thirty years, development has spread onto the surrounding mountainous slopes.
b. Seismic Location. The relatively young geological processes that have created the San Francisco Bay Area are still active today. The District sits on the Maacama fault between the San Andreas fault to the west and the Bartlett Springs fault to the east. c. Size and Population. The Ukiah Valley Fire District covers 98 square miles including a population estimated at 35,000. Ukiah Valley Fire has the largest number of dispatches of any fire district in Mendocino County. Within the Fire Protection District are four (4) fire stations and a total of 34 Fire District personnel. The Fire Protection District handles diverse responsibilities including wildland, urban, freeway, and medical. d. Roads and Streets. The 2005 Regional Transportation Plan states that the mountainous nature of Mendocino County tends to minimize ground transportation options throughout the region. As a result, lengthy cul-de-sacs, dead-end roads, and looped road systems generally service many of the existing and new developments. Some planned unit developments are served by private roads, which create access problems (i.e., narrow paved widths and on-street parking).

The roadway systems on the flat lands within the Ukiah Valley Fire District are for the most part a grid or loop system. Many of the roads servicing residential areas on the east and west foothills of the District are narrow and winding affording difficult ingress to emergency apparatus. Ingress and egress into the foothill areas will be made extremely difficult by large-scale emergencies such as earthquake and wildland fire. e. Topography. The District’s service area is a conglomeration of valley floor, mountainous slopes, and ridges. The flatter lands are found in the central portion of the District. Most of the existing urban and suburbanized areas are on relatively flat lands (0 – 5% slope).

Page 1709 of 1716 ends
Page 3 of 5 ends

Correspondingly, there is much diversity in slope percentages to the east and west of the valley floor. Slopes on the northeast side of the valley floor average 26% and range from 8- 80%. Slopes on the southeast side of the valley floor average 35% and range from 9-80%.

Slopes on the northwest side of the valley floor average 32% and range from 13-80%.

Slopes on the southwest side of the valley floor average 48% and range from 6-80%. Slope is an important factor in fire spread. As a basic rule of thumb, the rate of spread will double as the slope percentage doubles, all other factors remaining the same.

Elevations are varied in the District with the most southwest turn on Ruddick Cunningham Road listed as 566 feet above sea level. The average elevation of the valley floor within the District is 585 feet above sea level. The highest elevation is located above Willow Creek on the east side of the District at 2600 feet above sea level. f. Vegetation. The Ukiah Valley’s semi-arid Mediterranean-type climate produces vegetation similar to that of most of Mendocino County, with specific growth locale a result of topography and prevailing wind. The south facing exposures are primarily annual grass with occasional clumps of Oak trees. The east, north, west facing slopes are heavily wooded from lower elevations to ridge with Oak, Madrone, Douglas-fir, Redwood, and minor shrubs of the general Chaparral class.

Expansion of the residential community into areas of heavier vegetation has resulted in homes existing in close proximity to dense natural foliage. Often such dwellings are completely surrounded by highly combustible vegetation compounding the fire problem from a conflagration point of view.
g. Hydrology. The Ukiah Valley Fire District contains Lake Mendocino, the Russian River, Mill Creek, Robinson Creek and multiple ephemeral streams. Annual precipitation at or above the annual average of 37 inches can result in flooding along the Russian River and its tributaries. These flooding events lead to increased emergency response times for apparatus responding through or around the flooded roadways. h. Summary. The above local geographic and topographic conditions increase the magnitude, exposure, accessibility problems, and fire hazards presented to the Ukiah Valley Fire District.

Fire following an earthquake has the potential of causing greater loss of life and damage than the earthquake itself.

The majority of the Ukiah Valley’s industrial/commercial complexes are located in close proximity to the Maacama fault. This fault zone also contains the largest concentration of hazardous materials. Hazardous materials, particularly toxic gases, could pose the greatest threat to the largest number, should a significant seismic event occur. The District’s resources would have to be prioritized to mitigate the greatest threat, and may likely be unavailable for smaller single-dwelling or structure fires.

Other variables may tend to intensify the situation:
1) The extent of damage to the water system;
2) The extent of isolation due to bridge and/or freeway overpass collapse; 3) The extent of roadway damage and/or amount of debris blocking the roadways; 4) Climatic conditions (hot, dry weather with high winds);

Page 1710 of 1716 ends
Page 4 of 5 ends

5) Time of day will influence the amount of traffic on roadways and could intensify the risk to life during normal business hours;
6) The availability of timely mutual aid or military assistance; Conclusion: Local climatic, geographic, and topographic conditions impact fire prevention efforts, and the frequency, spread, acceleration, intensity and size of fire involving buildings in this community. Further, they affect potential damage to all structures from earthquake, or flood, and subsequent fire. Therefore it is found to be reasonably necessary that the California Fire Code and the State Building Standards Code be changed or modified to mitigate the effects of the above conditions.

Furthermore, California Health and Safety Code Section 17958.7 requires that the modification or change be expressly marked and identified as to which each finding refers. Therefore, the City of Ukiah City Council finds that the following table provides code sections that have been modified pursuant to Ordinance 2023-1 which are building standards as defined in Health and Safety Code Section 18909, and the associated referenced conditions for modification due to local climatic, geological and topographical reasons.

Section Number Local climatic, geological and topographical conditions 503 1e, 2a, 2b, 2e, 2f, 2h
503.3 1e, 2a, 2b, 2e, 2f, 2h
503.3.3 1e, 2a, 2d, 2e, 2f
505.1 1e, 2h
505.3 1e, 2h
505.4 1e, 2c
505.5 1e, 2h
506.1 1e, 2h
506.1.1 1e, 2h
506.2 1e, 2h
1201.4 1e, 2h
903.2 1e, 2h
3307.5 1e,2h
Table B105.2 1e, 2h
BB105.1 1e, 2h
5704.2.9.6.1 1e, 2h
5706.2.4.4 1e, 2h
5806.2 1e, 2h
6104.2 1e, 2h
NOW, THEREFORE, BE IT FURTHER RESOLVED AND ORDERED that the Fire Chief of the Ukiah Valley Fire District shall provide a copy of the change or modification together with a copy of this resolution to the County of Mendocino pursuant to California Health and Safety Code Section 13869.7(b)

Page 1711 of 1716 ends
Page 5 of 5 ends

PASSED AND ADOPTED, by the City of Ukiah City Council, County of Mendocino, State of California on September 17, 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Douglas F. Crane, Mayor
ATTEST:

Kristine Lawler, City Clerk

Page 1712 of 1716 ends
Page 1 of 1 ends

Agenda Item No: 14.c.

MEETING DATE/TIME: 9/17/2025

ITEM NO: 2025-1011

AGENDA SUMMARY REPORT
SUBJECT: Receive Updates on City Council Committee and Ad Hoc Assignments, and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad Hoc(s).

DEPARTMENT: City Clerk PREPARED BY: Kristine Lawler, City Clerk PRESENTER: Mayor Crane and Various Councilmembers
ATTACHMENTS:

1. 2025 City Council Special Assignments and Ad Hocs
Summary: City Council members will provide reports and updates on their committee and ad hoc assignments. If necessary, the Council may consider modifications.

Background: City Council members are assigned to a number of committees and ad hoc activities. These assignments are included as Attachment 1.

Discussion: Previously, the City Council discussed having more time allocated to reporting on committee and ad hoc activities. Often, the Council Reports section of the regular agenda is rushed due to impending business (i.e., public hearings), and not enough time is afforded for reports beyond community activities.

In an effort to foster regular updates on committee and ad hoc assignments, this item is being placed on the agenda to provide the City Council members an expanded opportunity to report on assignments and modify assignments as necessary.

Recommended Action: Receive report(s). The Council will consider modifications to committee and ad hoc assignments along with the creation/elimination ad hoc(s).

BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: No GRANT: No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
STRATEGIC PLAN (SP): N/A
CLIMATE INITIATIVES (CI): N/A
GENERAL PLAN ELEMENTS (GP): N/A

Page 1713 of 1716 ends

2025 CITY COUNCIL SPECIAL ASSIGNMENT LIST

LOCAL / UKIAH VALLEY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT City Broadband Project TBD TBD
Civic Center300 Seminary Ave.Ukiah, CA 95482
to evaluate the Request for Proposal (RFP) for the Internet Service Provider (ISP) for the California's Public Utilities Commission (CPUC) Last Mile Broadband Orozco Jim Robbins, Grants Manager, 463-6708; [email protected] Investment Oversight Committee Varies
Civic Center 300 Seminary Ave. Ukiah, CA 95482
Civic Center300 Seminary Ave.Ukiah, CA 95482
Reviews City investments, policies, and strategies
CraneOrozco - Alternate Alan Carter, Treasurer
Dan Buffalo, Director of Finance; 463-6220 [email protected] Disaster Council
Shall meet a minimum of once a year at a time and place designated upon call of the chair Place designated upon call of the chair or, if she/he is unavailable or unable to call such meeting, the first vice chair and then the City Manager or her/his designee.

Office of Emergency Management 300 Seminary Ave. Ukiah, CA 95482467-5720 - Traci Boyl Develop any necessary emergency and mutual aid plans, agreements, ordinances, resolutions, rules, and regulations.

OrozcoCriss - Alternate
Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Greater Ukiah Business & Tourism Alliance (GUPTA)
4th Monday of month, 10 a.m.
200 S School St.Ukiah, CA 95482
200 S School St.Ukiah, CA 95482
Promotes tourism and works to strengthen and promote the historic downtown and businesses within the greater Ukiah area Marianne Davison - Community Services Department Staff Orozco - Alternate Shannon Riley, Deputy City Manager; 467-5793 [email protected] Mendocino County Inland Water and Power Commission (IWPC) 2nd Thursday of month, 6:00 p.m.

Civic Center 300 Seminary Avenueconference room 5
IWPC Staff P.O. Box 1247Ukiah, CA 95482391-7574 - Candace Horsley Develops coordination for water resources and current water rights: Potter Valley project - Eel River Diversion RodinOrozco - Alternate
Sean White, Director of Water Resources; 463-5712 [email protected] North Coast Opportunities (NCO) 4th Wednesday of month, 2 p.m. Alternating locations - Ukiah and Lakeport Governing Board Chair North Coast Opportunities413 North State StreetUkiah, CA 95482 Assist low income and disadvantaged people to become self reliant Neil Davis Neil Davis, Community Services Director; [email protected] Sun House Guild ex officio 2nd Tuesday of month, 10:30 a.m. Sun House 431 S. Main St. Ukiah, CA 431 S. Main Street Ukiah, CA 95482 467-2836 Support and expand Grace Hudson Museum Orozco, Sher Neil Davis - Alternate David Burton, Museum Director; 467-2836 [email protected] Ukiah Valley Basin Groundwater Sustainability Agency (GSA) 2nd Thursday of month, 1:30 p.m.

Board of Supervisors Chambers; 501 Low Gap Road Ukiah, CA County Executive Office501 Low Gap Rd., Rm. 1010Ukiah, CA 95482463-4441 GSA serves as the Groundwater Sustainability Agency in the Ukiah Valley basin CraneN/A - Alternate
Sean White, Director of Water Resources; 463-5712 [email protected]

MENDOCINO COUNTY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT City Selection Committee Called as required by the Clerk of the Board BOS Conference Room 501 Low Gap Rd. Rm. 1090 Ukiah, CA C/O: BOS 501 Low Gap Rd., Rm 1090 Ukiah, CA 95482 463-4441 Makes appointments to LAFCO and Airport Land Use Commission (Mayor - Primary; Vice Mayor - Alternate) Mayor Crane Vice Mayor Sher Kristine Lawler, City Clerk; 463-6217 [email protected] Economic Development & Financing Corporation (EDFC)
2nd Thursday of month, 2:00 p.m.

Primarily 631 S. Orchard Street (location varies)
Executive Director631 South Orchard AvenueUkiah, CA 95482467-5953 Multi-agency co-op for economic development and business loan program Riley (appointed 12/19/18) Shannon Riley, Deputy City Manager; 467-5793 [email protected] Library Advisory Board
3rd Wednesdays of alternate months; 1:00
p.m.

Various Mendocino County Libraries Ukiah County Library 463-4491 Review library policy and activities Sher Rodin - Alternate Kristine Lawler, City Clerk; 463-6217; [email protected] Mendocino County 1st District Liaison Monthly; TBD
Civic Center Annex conference room #5 411 West Clay St. Ukiah, CA 95482 Civic Center300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the City's 1st District Supervisor Crane Rodin - Alternate
Sage Sangiacomo, City Manager; 463-6221; [email protected] Mendocino County 2nd District Liaison 1st Wednesdays of month, 8:00 a.m.

Civic Center Annex conference room #5 411 West Clay St. Ukiah, CA 95482 Civic Center300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the County's 2nd District Supervisor CrissRodin - Alternate
Shannon Riley, Deputy City Manager;467-5793 [email protected] Mendocino Council of Governments (MCOG)
1st Monday of month, 1:30 p.m.

Board of Supervisors Chambers 501 Low Gap Road Ukiah, CA Executive Director367 N. State Street, Ste. 206 Ukiah, CA 95482463-1859 Plan and allocate State funding, transportation, infrastructure and project County wide Criss Sher - Alternate
Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Schlatter, Community Development Director; 463-6219; [email protected] Mendocino County Airport Land Use Commission As needed
BOS Conference Room 501 Low Gap Rd., Rm. 1090, Ukiah, CA Mendocino County Executive Office 501 Low Gap Rd. Rm. 1010 Ukiah, CA 95482 To formulate a land use compatibility plan, provide for the orderly growth of the airport and the surrounding area, and safeguard the general welfare of the inhabitants within the vicinity Liaisons: Owen/Schlatter
Greg Owen, Airport Manager; 467-2855; [email protected] Craig Schlatter, Director of Community Development; 463-6219; [email protected] Mendocino County Local Area Formation Commission (LAFCO) 1st Monday of month, 9:00 a.m. Board of Supervisors Chambers Executive Director200 S. School Street, Ste. 2 Ukiah, CA 95482463-4470 Required by legislation - planning spheres of influence, annexation, service areas, and special districts RodinCrane - Alternate for both city seat
members on Commission
Craig Schlatter, Director of Community Development; 463-6219; [email protected] Updated: 9/4/2025

Page 1714 of 1716 ends

2025 CITY COUNCIL SPECIAL ASSIGNMENT LIST

MENDOCINO COUNTY
Continued MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Mendocino Solid Waste Management Authority (MSWMA)
3rd Thursday of every other month (varies), 10:00 a.m.

Willits Council Chambers
Solid Waste Director3200 Taylor DriveUkiah, CA 95482468-9710 County-wide Solid Waste JPA Crane Sher - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Transit Authority (MTA) Board of Directors
Last Wednesday of month, 1:30 p.m.

Alternating locations - Ukiah Conference Center or Fort Bragg, or Point Arena Executive Director241 Plant RoadUkiah, CA 95482462-1422 County-wide bus transportation issues and funding Sher Rodin - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Youth Project JPA Board of Directors
3rd Wednesday of month, 7:45 a.m. 776 S. State Street Conference Room Mendocino Co. Youth Project776 S. State Street, Ste. 107Ukiah, CA 95482 707-463-4915 Targets all youth with a focus on drug and alcohol prevention, healthy alternatives and empowering youth to make healthy choices Criss Max Brazill, Admin Lieutenant - Alternate
Tom Corning, Police Chief; 463-6254;
[email protected]
Russian River Flood Control District
(RRFCD) Liaison
1st Monday of month, 5:30 p.m.
151 Laws Ave.,Suite D Ukiah, CA
151 Laws Ave., Ukiah, CA 95482; [email protected]; 462-5278 Proactively manage the water resources of the upper Russian River for the benefit of the people and environment of Mendocino County White/Orozco Sean White, Director of Water Resources; 463-5712 [email protected] Ukiah Players Theater Board of Directors
3rd Tuesday of month, 6:00 p.m
1041 Low Gap Rd Ukiah, CA 95482 462-1210
1041 Low Gap RdUkiah, CA 95482462-1210
To oversee the activities, organization and purpose of the Ukiah Players Theater
Greg Owen, Airport Manager(appointed 12/19/18)
Kristine Lawler, City Clerk; 463-6217 [email protected] Ukiah Unified School District (UUSD) Committee Quarterly 511 S. Orchard, Ste. D Ukiah, CA 95482 511 S. Orchard Ukiah, CA 95482 Information exchange with UUSD Board Chair, Mayor, Superintendent, and City Manager Orozco, Criss Sage Sangiacomo, City Manager Cedric Crook, Police Chief Sage Sangiacomo, City Manager; 463-6221 [email protected]

REGIONAL MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Great Redwood Trail Agency (GRTA) Bi-monthly, 3rd Thursdays, 10:30 a.m. Various Locations - announced 419 Talmage Road, Suite M Ukiah, CA 95482 463-3280 Provides a unified and revitalized rail infrastructure meeting the freight and passenger needs of the region Rodin Sher- Alternate Neil Davis, Community Services Director 467-5764 [email protected] League of California Cities Redwood Empire Legislative Committee Prior to Division Meetings, meets 3x in person and then via conference call Various locations that are announced
Redwood Empire League President; Public Affairs Program Manager (916) 658-8243 Elected city officials and professional city staff attend division meetings throughout the year to share what they are doing and advocate for their interests in Sacramento OrozcoCriss - Alternate
Sage Sangiacomo, City Manager; 463-6221
[email protected]
Russian River Watershed Association (RRWA)
4th Thursday of month, 9:00 a.m. (only 5 times a year)
Windsor Town Hall9291 Old Redwood Hwy, #400Windsor, CA 95492707-838-1000 Russian River Watershed Association 2235 Mercury Way, Suite 105Santa Rose, CA [email protected] 707-508-3670 (message only) Consider issues related to Russian river - plans projects and funding requests RodinSher - Alternate
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected]
Northern California Power Agency (NCPA) - Commission
4th Thursday of month, 9:00 a.m. (see NCPA calendar)
Roseville, CA and other locations
651 Commerce Drive Roseville, CA 95678916-781-4202
Pool of State and local power utilities developing and operating power generation, providing scheduling and related energy services and providing regulatory and legislative support.

Crane - Commissioner Sher - City Council Alternate Sauers - Alternate and Commissioner in absence of Commissioner Crane
Cindi Sauers - Electric Utility Director;463-6286 [email protected] Northern California Power Agency (NCPA) – Lodi Energy Center (LEC) Appointment 2nd Monday of month, 10:00 AM Lodi, CA and other locations 651 Commerce DriveRoseville, CA 95678916-781-4299
Committee oversees the operation, maintenance and expenditures of the LEC 300 MW generating project.

Sauers – Project Participate Appointee
Cindy Sauers, Electric Utility Director,463‐6286, [email protected] Transmission Agency of Northern California (TANC)
4th Wednesday of month, 10 a.m. 35 Iron Point Circle Suite 225 Folsom, CA 35 Iron Point Cir #225Folsom, CA 95630916-852-1673; [email protected] Provide electric transmission to its Member utilities through transmission line ownership or contract arrangements.

CraneSauers - Alternate
Cindi Sauers - Electric Utility Director;
463-6286 [email protected]

STANDING COMMITTEES MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Diversity and Equity TBD Virtual Meeting Room (link to be created) Civic Center 300 Seminary Ave. Ukiah, CA 95482 Improve diversity and equity in the City’s workforce and municipal services Orozco/Criss Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Fire Executive Committee
2nd Tue, every other month beginning in January; 5:00 p.m.

Ukiah Valley Conference Center,200 S. School Street Ukiah, CA Civic Center300 Seminary Ave.Ukiah, CA 95482 [email protected] Per the recently adopted agreement between the City of Ukiah and the Ukiah Valley Fire Protection District Orozco/SherAlternates: Criss
Doug Hutchison, Fire Chief; 463-6263; [email protected] Countywide Oversight Board to the RDA Successor Agencies 4th Thursday of January, 4:00 p.m.; meets annually
Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: City Clerk300 Seminary Ave.Ukiah, CA 95482 Oversee and direct the Successor Agencies of the former redevelopment agencies Crane Dan Buffalo, Director of Finance; 463‐6220 [email protected] Lawler, City Clerk; 463‐6217, [email protected] Water Executive Committee(Ukiah Valley Water Authority) 1st Tue of each month
at 6:00 p.m.

Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: Sean White300 Seminary Ave.Ukiah, CA 95482 Oversight of UVWA; set annual budget for the combined water system; Manage rates and collect levies; modify existing water rights for the provision of water service; mediation and dispute resolution; Crane/Orozco Sean White, Director of Water Resources; 463-5712 [email protected] Updated: 9/4/2025

Page 1715 of 1716 ends

COMMITTEE ASSIGNED TO PRINCIPAL STAFF SUPPORT
Electric Grid Operational Improvements Crane/Orozco Cindy Sauers, Electric Utility Director; 463-6286 [email protected]
Trench Cut Policy Development Crane Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected]
Advance Planning & Policy for Annexation
Applications Crane/Rodin
Craig Schlatter, Community Development Director
463-6219 [email protected]
UVSD/ City Relations
Ad hoc committee to address specific issues with the Ukiah Valley Sanitation District, including discussion of overall sewer system service delivery policies, operating policy revisions, potential revisions to the current Operating Agreement, and cost sharing
Crane/Orozco
Dan Buffalo, Director of Finance;
463‐6220 [email protected]
Sean White, Water Resources Director
463‐5712 [email protected]
Orr Street Bridge Corridor Rodin/Sher Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected]
Complete Streets Rodin/Crane
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected]
Shannon Riley, Deputy City Manager
467-5793 [email protected]
Neil Davis, Community Services Director
467-5764 [email protected]
Special Districts (Water District Consolidation) Orozco/Crane Shannon Riley, Deputy City Manager 467‐5793 [email protected]
Corp Yard Planning Crane/Orozco Jason Benson, Senior Civil Engineer 463‐6284 [email protected]
Mendocino County Courthouse Project and Reuse Sher/Orozco Shannon Riley, Deputy City Manager 467‐5793 [email protected]
City's 150-Year Anniversary Planning Orozco/Rodin Shannon Riley, Deputy City Manager 467‐5793 [email protected]
Zoning Reform
Function is to explore creation of a new ministerial zoning permit and identify additional zoning streamlining and reform efforts to provide better and more consistent development outcomes
Crane/Orozco
Craig Schlatter, Community Development Director
463-6219 [email protected]
Community Health Needs Assessment (CHNA)
Steering Committee
assist in the creation of the 2025 CHNA Report for the
communities served by the three Adventist Health hospitals in Mendocino County. providing insight, identifying, gathering and analyzing the health needs of our community. Additionally Rodin/Sher
Jeremy Malin, NP
Director of Community Health Analytics
Adventist Health Howard Memorial
Adventist Health Ukiah Valley
Adventist Health Mendocino Coast
978-289-3330; [email protected]
Parks & Recreation Special District Exploration Rodin/Orozco Neil Davis, Community Services Director 467-5764 [email protected]
Downtown Zoning code Crane/Rodin
Craig Schlatter, Community Development Director
463-6219 [email protected]
Tourism Advisory Committee Rodin/Sher Shannon Riley, Deputy City Manager 467‐5793 [email protected]
Historic Preservation Code Sher/Criss Craig Schlatter, Community Development Director 463-6219 [email protected]
Fire Severity Rodin/Orozco Craig Schlatter, Community Development Director 463-6219 [email protected]
CalPERS Crane/Orozco Dan Buffalo, Director of Finance;
463‐6220 [email protected]
City Council Handbook Review and Update Sher Kristine Lawler, City Clerk 463‐6217; [email protected]

2025 AD HOC COMMITTEES
*Note: Changing the composition of an existing ad‐hoc among current councilmembers after work has begun presents potential Brown Act issues. Requests for fully filled ad‐hocs are represented on the draft, but staff does not recommend changes except to fill vacated assignments. The current requests on the sheet for fully composed ad‐hocs are primarily intended to convey interest in topics covered by these ad‐hoc committees for possible future consideration of new assignments.

Updated: 9/4/2025

Page 1716 of 1716 ends
← All documents from this meeting