BID SUMMARY
PROJECT: Citywide Street Pavement Rehabilitation Project (City Project No. 25-01) Project Manager: Eddie Yu, Civil Engineer II
DATE: Friday, November 14, 2025
TIME: 2:00 p.m.
LOCATION: City Council Chambers
34009 Alvarado-Niles Road
Union City, CA 94587
No. BIDDERS BID AMOUNT
*CORRECTED*
BID AMOUNT
1. Rapid Grading Service $2,059,000.00
2. VSS International, Inc. $2,095,325.00
3. Pavement Coatings Co. $2,053,727.10
4. Radius Earthwork Inc. $2,156,641.78
5. QA Constructors Inc. $2,262,090.66
6. Terocons Inc $2,385,574.00
7. Frontline General Engineering Construction Inc. $1,953,458.04
8. Interstate Grading & Paving Inc. $2,310,914.00
9. G. Bortolotto & Co., Inc. $1,992,759.43
10. S&H Construction, Inc. $2,568,600.00
11. Cato’s General Engineering, Inc $2,205,762.00 $2,226,462.00
I, Christopher Chang, Administrative Specialist – Confidential with The City of Union City, do hereby certify that on Friday, November 14, 2025, I received and opened 11 (eleven) bids for the above-mentioned project.
* Note: All bid amounts will be verified by the Engineer. Any corrections will be shown in the column above.
________________________________
Christopher Chang
Administrative Specialist – Confidential
City of Union City
BASE BID
ITEM No. ITEM DESCRIPTION UNIT QTY UNIT PRICE UNIT PRICE AMOUNT UNIT PRICE AMMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMMOUNT 1 Mobilization LS 1 175000 $ 143,501.28 $ 143,501.28 $ 110,000.00 $ 110,000.00 $ 100,000.00 $ 100,000.00 $ 75,000.00 $ 75,000.00 $ 41,818.00 $ 41,818.00 2 Traffic and Pedestrian Control LS 1 175000 $ 18,000.00 $ 18,000.00 $ 220,000.00 $ 220,000.00 $ 157,500.00 $ 157,500.00 $ 195,281.80 $ 195,281.80 $ 283,428.00 $ 283,428.00 3 Clearing, Grubbing, and Removals LS 1 60,000 $ 18,835.20 $ 18,835.20 $ 15,000.00 $ 15,000.00 $ 50,000.00 $ 50,000.00 $ 6,500.00 $ 6,500.00 $ 49,283.42 $ 49,283.42 4 Crack Seal/Crack Mastic/Patching Compound LS 1 100,000 $ 47,664.00 $ 47,664.00 $ 84,000.00 $ 84,000.00 $ 85,000.00 $ 85,000.00 $ 86,250.00 $ 86,250.00 $ 100,700.00 $ 100,700.00 5 Cape Seal, 2-Layer System (Asphalt Rubber Chip Seal + Polymer-Modified Slurry Seal) SY 75,418 791,891 $ 849,206.68 11.26 $ 7.26 $ 547,534.68 $ 8.65 $ 652,365.70 $ 7.35 $ 554,322.30 $ 9.25 $ 697,616.50 $ 6 Polymer Modified Slurry (1-Layer, Type II Seal) SY 8,655 30,291 $ 5.63 $ 48,727.65 $ 3.40 $ 29,427.00 $ 3.90 $ 33,754.50 $ 4.00 $ 34,620.00 $ 3.25 $ 28,128.75 7 Full Width Cold Planing (2” Thick) SY 20,430 132,795 $ 4.91 $ 100,311.30 $ 5.60 $ 114,408.00 $ 6.15 $ 125,644.50 $ 5.40 $ 110,322.00 $ 3.71 $ 75,795.30 8 Type A Hot Mix Asphalt (2” Thick) TON 2,298 367,740 $ 150.55 $ 345,963.90 $ 138.00 $ 317,124.00 $ 150.00 $ 344,700.00 $ 172.00 $ 395,256.00 $ 121.90 $ 280,126.20 9 Base Failure Repair (6" Removal & 6" HMA Replacement) TON 439 120,728 $ 197.87 $ 86,864.93 $ 199.00 $ 87,361.00 $ 220.00 $ 96,580.00 $ 392.00 $ 172,088.00 $ 227.90 $ 100,048.10 10 Remove & Replace Sidewalk SF 180 6,300 $ 25.56 $ 4,600.80 $ 21.00 $ 3,780.00 $ 24.50 $ 4,410.00 $ 28.00 $ 5,040.00 $ 19.08 $ 3,434.40 11 Remove & Replace Cub & Gutter LF 110 27,500 $ 38.82 $ 4,270.20 $ 130.00 $ 14,300.00 $ 105.00 $ 11,550.00 $ 120.00 $ 13,200.00 $ 84.80 $ 9,328.00 12 Remove & Replace ADA Curb Ramp (Type C) EA 33 297,000 $ 2,365.79 $ 78,071.07 $ 7,500.00 $ 247,500.00 $ 6,500.00 $ 214,500.00 $ 6,150.00 $ 202,950.00 $ 6,360.00 $ 209,880.00 13 Surface-Applied Tactile Warning Mat (Retrofit Installation) EA 43 27,950 $ 864.64 $ 37,179.52 $ 1,300.00 $ 55,900.00 $ 600.00 $ 25,800.00 $ 892.00 $ 38,356.00 $ 1,325.00 $ 56,975.00 14 Install Basic Crosswalk LF 546 6,552 $ 16.26 $ 8,877.96 $ 11.50 $ 6,279.00 $ 11.00 $ 6,006.00 $ 10.50 $ 5,733.00 $ 11.13 $ 6,076.98 15 Install Continental Crosswalk LF 170 3,570 $ 36.97 $ 6,284.90 $ 23.00 $ 3,910.00 $ 22.00 $ 3,740.00 $ 21.00 $ 3,570.00 $ 22.26 $ 3,784.20 16 Install Ladder Crosswalk LF 55 1,320 $ 66.38 $ 3,650.90 $ 30.00 $ 1,650.00 $ 26.00 $ 1,430.00 $ 26.00 $ 1,430.00 $ 26.50 $ 1,457.50 17 Install 12" Thermoplastic Stripe (Stop Bar) LF 955 11,460 $ 14.70 $ 14,038.50 $ 11.00 $ 10,505.00 $ 11.00 $ 10,505.00 $ 10.50 $ 10,027.50 $ 11.13 $ 10,629.15 18 Install Detail 9 Stripe (Lanelines) LF 1,373 5,492 $ 3.47 $ 4,764.31 $ 1.75 $ 2,402.75 $ 1.30 $ 1,784.90 $ 1.30 $ 1,784.90 $ 1.33 $ 1,826.09 19 Install Detail 22 Stripe (Double Yellow No Passing Zone) LF 5,272 47,448 $ 5.31 $ 27,994.32 $ 4.25 $ 22,406.00 $ 4.20 $ 22,142.40 $ 4.00 $ 21,088.00 $ 4.24 $ 22,353.28 20 Install Detail 38 Stripe (Channelizing Line) LF 243 608 $ 12.43 $ 3,020.49 $ 4.00 $ 972.00 $ 3.70 $ 899.10 $ 3.50 $ 850.50 $ 3.71 $ 901.53 21 "Stop" Legend LF 45 11,700 $ 479.18 $ 21,563.10 $ 400.00 $ 18,000.00 $ 370.00 $ 16,650.00 $ 355.00 $ 15,975.00 $ 371.00 $ 16,695.00 22 "Speed Limit" Legend LF 8 2,160 $ 490.10 $ 3,920.80 $ 250.00 $ 2,000.00 $ 211.00 $ 1,688.00 $ 203.00 $ 1,624.00 $ 212.00 $ 1,696.00 23 "Stop Ahead" Legend LF 1 350 $ 2,960.80 $ 2,960.80 $ 900.00 $ 900.00 $ 846.00 $ 846.00 $ 812.00 $ 812.00 $ 848.00 $ 848.00 24 "Turn Arrowhead" Legend LF 5 1,500 $ 670.16 $ 3,350.80 $ 275.00 $ 1,375.00 $ 238.00 $ 1,190.00 $ 228.00 $ 1,140.00 $ 238.50 $ 1,192.50 25 "Thru+Turn Arrowhead" Legend LF 1 450 $ 1,798.00 $ 1,798.00 $ 325.00 $ 325.00 $ 291.00 $ 291.00 $ 279.00 $ 279.00 $ 291.50 $ 291.50 26 Adjust Monument Box to Grade EA 20 25,000 $ 795.31 $ 15,906.20 $ 900.00 $ 18,000.00 $ 1,000.00 $ 20,000.00 $ 1,750.00 $ 35,000.00 $ 980.50 $ 19,610.00 27 Adjust Storm Drain Manhole Cover to Grade EA 2 2,500 $ 4,142.40 2,071.20 $ 1,100.00 $ 2,200.00 $ 1,250.00 $ 2,500.00 $ 1,500.00 $ 3,000.00 $ 1,356.80 $ 2,713.60 $ 28 Adjust ACWD Water Valve to Grade (revocable) EA 27 33,750 $ 497.07 $ 13,420.89 $ 900.00 $ 24,300.00 $ 1,000.00 $ 27,000.00 $ 1,000.00 $ 27,000.00 $ 980.50 $ 26,473.50 29 Adjust ACFC Fire Hydrant Water Valve to Grade (revocable) EA 9 11,250 $ 1,164.53 $ 10,480.77 $ 900.00 $ 8,100.00 $ 1,000.00 $ 9,000.00 $ 1,000.00 $ 9,000.00 $ 980.50 $ 8,824.50 30 Adjust USD Sewer Manhole to Grade (revocable) EA 21 26,250 $ 1,146.97 $ 24,086.37 $ 1,100.00 $ 23,100.00 $ 1,250.00 $ 26,250.00 $ 1,500.00 $ 31,500.00 $ 1,590.00 $ 33,390.00 TOTAL BASE BID AMOUNT $ 2,503,555 1,953,458.04 $ 1,992,759.43 $ 2,053,727.10 $ $ 2,095,325.00 2,059,000.00 $ % Under Below the Engineer's Estimate 22% 20% 18% 18% 16%
UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
UNIT PRICE AMMOUNT UNIT PRICE AMMOUNT UNIT PRICE AMMOUNT UNIT PRICE AMMOUNT UNIT PRICE AMMOUNT UNIT PRICE AMMOUNT $ 133,775.00 133,775.00 $ 45,000.00 $ 45,000.00 $ 140,000.00 $ 140,000.00 $ 110,000.00 $ 110,000.00 $ 110,000.00 $ 110,000.00 $ 50,000.00 $ 50,000.00 $ $ 169,183.50 169,183.50 $ 110,000.00 $ 110,000.00 $ 159,000.00 $ 159,000.00 $ 188,000.00 $ 188,000.00 $ 69,000.00 $ 69,000.00 $ 50,000.00 $ 50,000.00 $ $ 48,375.00 48,375.00 $ 45,000.00 $ 45,000.00 $ 31,575.00 $ 31,575.00 $ 12,000.00 $ 12,000.00 $ 45,000.00 $ 45,000.00 $ 75,000.00 $ 75,000.00 $ $ 89,250.00 89,250.00 $ 90,000.00 $ 90,000.00 $ 74,000.00 $ 74,000.00 $ 100,000.00 $ 100,000.00 $ 70,000.00 $ 70,000.00 $ 40,000.00 $ 40,000.00 $ $ 563,372.46 7.47 $ 6.00 $ 452,508.00 $ 7.21 $ 543,763.78 $ 10.00 $ 754,180.00 $ 10.00 $ 754,180.00 $ 9.00 $ 678,762.00 $ $ 27,696.00 3.20 $ 6.00 $ 51,930.00 $ 3.05 $ 26,397.75 $ 5.00 $ 43,275.00 $ 6.00 $ 51,930.00 $ 8.00 $ 69,240.00 $ $ 111,343.50 5.45 $ 3.50 $ 71,505.00 $ 6.06 $ 123,805.80 $ 6.50 $ 132,795.00 $ 5.00 $ 102,150.00 $ 15.00 $ 306,450.00 $ $ 386,339.76 168.12 $ 290.00 $ 666,420.00 $ 200.00 $ 459,600.00 $ 140.00 $ 321,720.00 $ 200.00 $ 459,600.00 $ 300.00 $ 689,400.00 $ $ 120,896.21 275.39 $ 300.00 $ 131,700.00 $ 500.00 $ 219,500.00 $ 220.00 $ 96,580.00 $ 250.00 $ 109,750.00 $ 350.00 $ 153,650.00 $ $ 5,805.00 32.25 $ 42.00 $ 7,560.00 $ 55.51 $ 9,991.80 $ 30.00 $ 5,400.00 $ 35.00 $ 6,300.00 $ 70.00 $ 12,600.00 $ $ 20,694.30 188.13 $ 110.00 $ 12,100.00 $ 124.71 $ 13,718.10 $ 100.00 $ 11,000.00 $ 60.00 $ 6,600.00 $ 80.00 $ 8,800.00 $ $ 283,800.00 8,600.00 $ 6,500.00 $ 214,500.00 $ 7,470.71 $ 246,533.43 $ 9,500.00 $ 313,500.00 $ 8,000.00 $ 264,000.00 $ 100.00 $ 3,300.00 $ $ 36,120.00 840.00 $ 900.00 $ 38,700.00 $ 550.00 $ 23,650.00 $ 800.00 $ 34,400.00 $ 1,500.00 $ 64,500.00 $ 450.00 $ 19,350.00 $ $ 6,022.38 11.03 $ 15.00 $ 8,190.00 $ 12.00 $ 6,552.00 $ 14.00 $ 7,644.00 $ 40.00 $ 21,840.00 $ 200.00 $ 109,200.00 $ $ 3,748.50 22.05 $ 18.00 $ 3,060.00 $ 57.00 $ 9,690.00 $ 26.00 $ 4,420.00 $ 40.00 $ 6,800.00 $ 250.00 $ 42,500.00 $ $ 1,443.75 26.25 $ 18.00 $ 990.00 $ 60.00 $ 3,300.00 $ 33.00 $ 1,815.00 $ 50.00 $ 2,750.00 $ 150.00 $ 8,250.00 $ $ 10,533.65 11.03 $ 10.00 $ 9,550.00 $ 10.00 $ 9,550.00 $ 14.00 $ 13,370.00 $ 20.00 $ 19,100.00 $ 15.00 $ 14,325.00 $ $ 1,798.63 1.31 $ 10.00 $ 13,730.00 $ 4.00 $ 5,492.00 $ 2.50 $ 3,432.50 $ 10.00 $ 13,730.00 $ 10.00 $ 13,730.00 $ $ 22,142.40 4.20 $ 6.00 $ 31,632.00 $ 10.00 $ 52,720.00 $ 6.00 $ 31,632.00 $ 12.00 $ 63,264.00 $ 12.00 $ 63,264.00 $ $ 894.24 3.68 $ 9.00 $ 2,187.00 $ 7.00 $ 1,701.00 $ 3.50 $ 850.50 $ 10.00 $ 2,430.00 $ 10.00 $ 2,430.00 $ $ 16,537.50 367.50 $ 600.00 $ 27,000.00 $ 220.00 $ 9,900.00 $ 300.00 $ 13,500.00 $ 500.00 $ 22,500.00 $ 300.00 $ 13,500.00 $ $ 1,680.00 210.00 $ 400.00 $ 3,200.00 $ 530.00 $ 4,240.00 $ 225.00 $ 1,800.00 $ 500.00 $ 4,000.00 $ 350.00 $ 2,800.00 $ $ 840.00 840.00 $ 800.00 $ 800.00 $ 530.00 $ 530.00 $ 700.00 $ 700.00 $ 1,000.00 $ 1,000.00 $ 699.00 $ 699.00 $ $ 1,181.25 236.25 $ 400.00 $ 2,000.00 $ 150.00 $ 750.00 $ 200.00 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 600.00 $ 3,000.00 $ $ 288.75 288.75 $ 400.00 $ 400.00 $ 270.00 $ 270.00 $ 350.00 $ 350.00 $ 1,000.00 $ 1,000.00 $ 850.00 $ 850.00 $ $ 16,125.00 806.25 $ 2,200.00 $ 44,000.00 $ 925.00 $ 18,500.00 $ 1,900.00 $ 38,000.00 $ 2,000.00 $ 40,000.00 $ 1,200.00 $ 24,000.00 $ $ 3,225.00 1,612.50 $ 3,000.00 $ 6,000.00 $ 1,280.00 $ 2,560.00 $ 1,400.00 $ 2,800.00 $ 1,500.00 $ 3,000.00 $ 2,000.00 $ 4,000.00 $ $ 20,317.50 752.50 $ 2,000.00 $ 54,000.00 $ 925.00 $ 24,975.00 $ 950.00 $ 25,650.00 $ 1,000.00 $ 27,000.00 $ 2,000.00 $ 54,000.00 $ $ 19,350.00 2,150.00 $ 2,200.00 $ 19,800.00 $ 925.00 $ 8,325.00 $ 950.00 $ 8,550.00 $ 850.00 $ 7,650.00 $ 1,500.00 $ 13,500.00 $ $ 33,862.50 1,612.50 $ 3,000.00 $ 63,000.00 $ 1,500.00 $ 31,500.00 $ 1,550.00 $ 32,550.00 $ 1,500.00 $ 31,500.00 $ 2,000.00 $ 42,000.00 $ $ 2,226,462.00 2,156,641.78 $ 2,262,090.66 $ 2,310,914.00 $ 2,385,574.00 $ 2,568,600.00 $ 14% 11% 10% 8% 5% -3%
11 Radius Earthwork Inc. Cato-s General Engineering Inc. QA Constructors Inc. Insterstate Grading & Paving Inc. S&H Construction,Inc 10 Terocons Inc.
CITY OF UNION CITY
34009 Alvarado Niles Road
Frontline General Engineering
Construction, Inc
2025-26 Citywide Street Pavement Rehabilitation Project (City Proj. No. 25-01)
BID SCHEDULE
6 1
VSS International, Inc.
7 8 9
4 G. Bortolotto & Company Inc. Pavement Coating Co. Rapid Grading Service 2 3 5