Union City Blvd Bike Lanes and Rehab
Project, City Project No. 17-29
Ribbon Cutting Celebration
Tuesday, September 16, 2025
Bicycle & Pedestrian Advisory Committee (BPAC) Meeting
Item 6.b.
Marilou R. Ayupan, Public Works Director
2 UCB Blvd Bike Lanes Project- Ribbon Cutting
Saturday, September 27th at Delaine Eastin School
3 UCB Blvd Bike Lanes Project- Ribbon Cutting
Draft Schedule and Program
10:00 -10:30 am Program (before Ribbon Cutting)
Welcome and Introductions
Expected Speakers
- Mayor
- City Manager Office
- Public Works
- BPAC
- Others
4 UCB Blvd Bike Lanes Project- Ribbon Cutting
Highlights, Street and Parking Impacts
5 UCB Blvd Bike Lanes Project- Ribbon Cutting
Site Map
6 UCB Blvd Bike Lanes Project- Ribbon Cutting
What is a Traffic Garden?
Fionnuala Quinn at trafficgardens.com
7 UCB Blvd Bike Lanes Project- Ribbon Cutting
Traffic Garden – “Bike-park” for children
8 UCB Blvd Bike Lanes Project- Ribbon Cutting
Traffic Garden – “Bike-park” for children
9 UCB Blvd Bike Lanes Project- Ribbon Cutting
Pop-Up Traffic Garden at Delaine Eastin Playground
10 UCB Blvd Bike Lanes Project- Ribbon Cutting
Pop Up Traffic Garden Concept
11 UCB Blvd Bike Lanes Project- Ribbon Cutting
12 UCB Blvd Bike Lanes Project- Ribbon Cutting
Pop Up Traffic Garden
Public Works Community & Recreation Services
13 UCB Blvd Bike Lanes Project- Ribbon Cutting
2017 Alameda CTC Grant (UCB Class 2 Bikes Lanes)
14 UCB Blvd Bike Lanes Project- Ribbon Cutting
2017 Alameda CTC Grant (UCB Class 2 Bikes Lanes)
15 UCB Blvd Bike Lanes Project- Ribbon Cutting
2017 Alameda CTC Grant (UCB Class 2 Bikes Lanes)
16 UCB Blvd Bike Lanes Project- Major Improvements
Northbound UCB at Eastin-Lowry Intersection
17 UCB Blvd Bike Lanes Project- Major Improvements
Northbound UCB at Dyer Street
Exist. Free Right-Turn Lane
Revised Intersection with 90-degree corner
18 UCB Blvd Bike Lanes Project- Major Improvements
Southbound UCB at Rocklin (Delaine Eastin School)
Buffered Class II Bike Lane with transition to Class I Bike/Ped Trail 19 UCB Blvd Bike Lanes Project- Major Improvements
Southbound UCB at Rocklin (Delaine Eastin School)
Dedicated Right-Turn Lane to School (for Queuing)
20 UCB Blvd Bike Lanes Project- Major Improvements
Southbound UCB at Rocklin (Delaine Eastin School)
Dedicated Class I Bike/Ped Trail to and from School
21 UCB Blvd Bike Lanes Project- Major Improvements
Roadway Safety Street Lighting for All Modes*
22 UCB Blvd Bike Lanes Project- Major Improvements
Roadway Safety Street Lighting for All Modes*
23 UCB Blvd Bike Lanes Project- Ribbon Cutting
2017 Alameda CTC Grant (UCB Class 2 Bikes Lanes)
Access Improvements to Delaine Eastin School
Dedicated SB UCB Right-Turn Lane on Rocklin (school traffic) New Class I trail along UCB (to and from school)
Complete Streets (at Lowry & Rocklin Intersections)
Corridor Wide Safety Improvements
New 11-foot Buffered Class II Bike Lanes with enhanced striping Enhanced Reflective Striping with reduced lane widths
Reduced Speed Limit to 40 mph (from 45 mph)
New reflective roadway signs and speed “feed back” signs Complete Streets Improvements at the Intersections
Enhanced Street Lighting for all modes of transportation 24 UCB Blvd Bike Lanes Project- Ribbon Cutting
2017 Alameda CTC Grant (UCB Class 2 Bikes Lanes)
Other Major Corridor Wide Improvements
Reconstructed medians for new roadway section
Eliminated free-right turn lane from NB UCB to Dyer St.
Pavement Rehabilitation with reconstructed cross slope areas Repaired major pavement problem areas
Major storm drain improvements at known flooding areas
Added stormwater treatment areas (bioswales)
New landscaping and irrigation in reconstructed median
New trees and scrubs at key intersections
New MVP (Maintenance Vehicle Pullout) areas in medians
25 UCB Blvd Bike Lanes Project- Ribbon Cutting
The City wants to thank all those who have
contributed to the planning, design and construction
of the project:
• Funding Partners
• Consultant Team
• Construction Team, and
BPAC Members
(Tim, Glenn, Jo Ann, Steve and Vanessa)
Let’s all celebrate this major accomplishment