LARRY WALKER ASSOCIATES
MRP Support Scope of Services FY 26-27 1
June 30, 2026
Diana Cangco, City Engineer
City of Union City
34009 Alvarado-Niles Rd
Union City, CA, 94587
[email protected]
Subject: MRP Support Scope of Services for Fiscal Year 2026-2027 Dear Ms. Cangco:

In response to your request, Larry Walker Associates (LWA) is pleased to submit this proposal for stormwater compliance planning support for the Union City (City) in connection with the National Pollutant Discharge Elimination System (NPDES) Municipal Regional Stormwater Permit (MRP).

LWA is an engineering, science, and regulatory consulting firm that specializes in public agency compliance support for NPDES permits. We have experience working with municipal stormwater permittees in the Bay Area and other regions throughout California, including the Alameda Countywide Clean Water Program. As you know, LWA is active with the Bay Area Municipal Stormwater Collaborative and the California Stormwater Quality Association. Through this involvement and our work with other stormwater Permittees, LWA has an in-depth understanding of the MRP, and we will leverage this knowledge and experience to assist the City in meeting your regulatory requirements.

Elizabeth Yin will serve as LWA’s project manager for this work. Ms. Yin brings over ten years of leadership, regulatory expertise, and program planning and implementation experience in municipal stormwater program management. Through multiple years of MRP Permit negotiations, Ms. Yin has developed a strong understanding of the challenges facing the Region and has successfully supported multiple municipal agencies in addressing them. Ms. Yin will be supported by a team of technical staff and me as the principal in charge.

LWA understands that the City plans to utilize the “pass-through” clause in the contract between the ACCWP and LWA. ACCWP authorizes work through Action Plans on a fiscal year basis, therefore this scope of work addresses the continuation of our work with the City for the fiscal year (FY) 2026-27.

The attached scope is based on our understanding of the compliance planning support that you have identified. The scope is structured to be flexible to assist you in planning for future needs and prioritizing the tasks you would like LWA to assist the City to accomplish. Work would be conducted on a time and materials basis. The budget for this work effort is estimated at a not to exceed value of $120,000 for FY 2026-27 unless authorized by the City and documented in an ACCWP Action Plan.

Please let me know if you have any questions. We look forward to collaborating with you on this project.

Sincerely,
Sandy Mathews, Vice President
Larry Walker Associates, Inc.
2246 Sixth Street
Berkeley, CA 94710
510.883.9873
www.lwa.com

LARRY WALKER ASSOCIATES
MRP Support Scope of Services FY 26-27 2

SCOPE OF SERVICES FOR THE CITY OF UNION CITY
FISCAL YEAR 2026-2027
LWA will provide as needed compliance planning support to the City of Union City (City) in connection with the Municipal Regional Stormwater Permit (MRP). The City will authorize the as-directed work efforts through email or telephone confirmation. LWA will work with the City to establish tasks and schedules. In the conduct of any fieldwork, LWA will not act in a health and safety advisory role for City staff or its consultants.

Task 1. Compliance Planning and Coordination
LWA will continue to assist the City in planning for the implementation of the MRP. This task will include:
• Monthly coordination with the City Engineer and key staff (12 meetings in FY 2026-27). • Updating the City specific work plan.
• Continued assistance to identify gaps and needs.
• Assisting the City to assess the impact of MRP 4 on the City’s stormwater program.

Task 2. Trash Compliance Support
LWA will continue to assist the City implement its trash compliance program. Ongoing work in FY 2026-27 assumes that LWA will perform field work to support the PLDA and OVTA Trash Compliance Programs. a) Private Land Drainage Areas (PLDAs)
LWA will provide support as needed on any follow-up actions for the inspected PLDAs and provide training or technical assistance to the City’s commercial/industrial business inspectors on adding trash observations to the standard inspections. It is assumed that three days of inspections are required to finalize the development of the PLDA Program. b) On-Land Visual Trash Assessments (OVTAs)
Following the identification of the required number of trash assessment points in FY 25-26, LWA will perform a total of three rounds of visual trash assessments in FY 26/27. The number of assessment points is small, and LWA anticipates approximately 1 field day per round of assessment.
c) Update AGOL Trash Generation Maps and Load Accounting LWA will coordinate with the City staff to update the City’s trash management data in the ACCWP AGOL system. This effort will include:
• Adding trash capture devices installed in 2025-26 and 2026-27 and calculating the tributary drainage area.
• Conducting desktop analyses of trash load reductions achieved in FY 2025-26 and FY 2026- 27 through street sweeping, on land clean up events, private business trash management actions, and trash capture devices verified through OVTA results, PLDA inspection results, and the drainage areas of installed trash capture devices.

Task 3. Annual Report Support
LWA will assist the City in completing and compiling the FY 2025-26 Annual Report and assist with supplemental report and efforts. To support the development of the Annual Report, LWA will use the annual report forms customized by ACCWP for its member agencies. In addition to the completion of the annual report forms, LWA will support the City with the cost reporting and asset management plan supplemental reporting elements.

LARRY WALKER ASSOCIATES
MRP SUPPORT SCOPE OF SERVICES FY 26-27 3
a) Annual Report Development
In early July 2026, LWA will create a schedule for the development of the Annual Report and review it with the City Engineer that identifies milestones and responsibilities. LWA will facilitate the development of the report and coordinate directly with assigned City staff. • LWA will pre-populate the ACCWP customized Annual Report forms with information from the City’s past annual reports and provide specific guidance for the City regarding updates to the information.
• LWA will email each section to the responsible City staff specifying deadlines and LWA staff to contact with questions. LWA will send reminders and follow-up with City staff. • LWA will review, clean up, and revise each section and send it back to the responsible City staff for confirmation of the information.
• LWA will provide a clean copy of the Annual Report along with the staff confirmations to the City Engineer for review.
• LWA will revise and provide a clean, indexed PDF of the annual report to the City Engineer along with a draft transmittal letter for signature.
• If desired, the City can designate the LWA Project Manager as a data submitter in SMARTS and we can upload the report for final certification by the City Engineer. b) Cost Reporting Support
LWA will assist the City in preparing the MRP implementation cost report. Building on LWA’s experience with the cost reporting framework and requirements, LWA will work with the City to identify, develop, and compile relevant stormwater program cost data. Tasks include:
• Coordinating with City staff to gather permit implementation cost data. • Compiling City-provided cost data into the Bay Area stormwater cost reporting tool. • Reviewing compiled data for completeness and consistency. • Responding to questions from City staff or the Regional Water Board during and after the compilation process.
c) Asset Management Support
LWA will assist the City with ongoing strategic planning to support implementation of the Asset Management Plan (AMP) submitted with the 2025 Annual Report. Work may include:
• Reviewing the submitted Asset Management Plan and identifying priorities for implementation and data maintenance.
• Coordinating with City staff and consultants to gather updated information on asset conditions and maintenance practices.
• Assisting the City in identifying tools and processes to maintain asset data. • Supporting updates to the asset inventory in the ACCWP AGOL system, as needed.

Task 4. As Needed Support
With MRP 4 negotiations under way, the City may need to adapt and adjust its stormwater program to anticipate future permitting efforts. This task may be used to support the City with as needed tasks, not to exceed $10,000.

LARRY WALKER ASSOCIATES
MRP SUPPORT SCOPE OF SERVICES FY 26-27 4
Fiscal Year 2026-2027 Budget
Task Effort
(Hours)
Budget
1 Compliance Planning and Coordination 91 $27,000
2 Trash Compliance Support
a Private Land Drainage Area Program (Private Parcels) 94 $17,500 b On Land Visual Trash Assessments (Public ROW) 57 $10,400 c AGOL Updates 40 $8,200
3 Annual Report Support
a Annual Report Development 156 $32,500
b Cost Reporting Support 24 $7,200
c Asset Management Support 24 $7,200
4 As Needed Support 44 $10,000
FY Total 529 $120,000
Proposed Scope of Services Approved by the City
____________________________ ______________
Joan Malloy Date
City Manager