The amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on City of Vallejo-furnished forms properly filled out and executed, including accompanying documentation as therein required, less the amount of the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the work will be considered. The estimated value of the material established by the Engineer will in no case exceed the Contract price for the item of work for which the material is furnished.
Unless otherwise approved by the Engineer in writing, Contractor shall submit to Engineer on or before the tenth (10th) day of the month, an itemized application for payment for the cost of the work in permanent place, which has been completed in strict accordance with the Contract Documents as of the last day of the preceding month, less amounts previously paid. The application for payment shall be prepared in a form acceptable to Engineer, and shall contain itemized amounts in accordance with the Contract Documents. The applications for payment shall not include requests for payment on account of changes which have not been authorized by Change Orders, or for amounts Contractor does not intend to pay a subcontractor because of a dispute or other reason.
If requested by the City of Vallejo, an application for payment shall be accompanied by a summary showing payment that will be made to subcontractors covered by such application, and unconditional waivers and releases of claims and stop notices, from each subcontractor listed in the preceding application for payment covering sums disbursed pursuant to that preceding application for payment.
Contractor warrants that upon submittal of an application for payment, all work has been performed in strict compliance with the Contract Documents, and all work for which certificates of payment have been previously issued and payment has been received from City of Vallejo, shall be free and clear of all claims, stop notices, security interests, and encumbrances in favor of Contractor, subcontractors or other persons or firms entitled to make claims by reason of having provided labor, materials, or equipment related to the work.
Payment of all, or any part, of an application for payment may be withheld, a certificate of payment may be withheld, all or part of a previous certificate for payment may be nullified and that amount withheld from a current certificate for payment, or the City of Vallejo may withhold from payment, on account of any of the following:
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-119
Defective work not remedied;
Third-party claims against Contractor or City of Vallejo arising from the acts or omissions of Contractor or subcontractors;
Stop notices;
Failure of Contractor to make timely payments due to subcontractors for material or labor;
A reasonable doubt that the work can be completed for the balance of the Contract price then unpaid;
Damage to the City of Vallejo or others for which Contractor is responsible; Reasonable evidence that the work cannot be completed within the Contract time, and the unpaid balance of the Contract price would not be adequate to complete the work and cover City of Vallejo's damages for the anticipated delay; Failure of Contractor to maintain, update, and submit record documents; Failure of Contractor to submit schedules or their updates as required by the Contract Documents;
Performance of the work by Contractor without properly processed shop drawings; Liquidated damages assessed;
Any other failure of Contractor to perform its obligations under the Contract Documents.
By resolution of the City of Vallejo’s City Council, a fund has been established, money appropriated in the current budget, and assigned to the account(s) which is/are the sole source(s) of funds available for payment of the Contract price. Contractor understands and agrees that Contractor will be paid only from this special fund and if for any reason this fund is not sufficient to pay Contractor, Contractor will not be entitled to payment.
The availability of money in this fund, and City of Vallejo's ability to draw from this fund, are conditions precedent to City of Vallejo's obligation to make payments to Contractor.
Within thirty (30) days of receipt of an approved certificate for payment, properly executed by the Contractor, City of Vallejo’s Engineer and Director, City of Vallejo agrees to pay Contractor, subject to all of the terms and conditions of these Contract Documents, an amount equal to ninety five percent (95%) of the sum of the following (less any amounts withheld as permitted by the Contract Documents):
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-120
Cost of the work in permanent place as of the end of the preceding month as set forth and approved on the certificate for payment; and
Less amounts previously paid.
9-1.065 PAYMENT OF WITHHELD FUNDS
Upon the Contractor's request, the City of Vallejo will make payment of funds withheld from progress payments to ensure performance of the Contract if the Contractor deposits in escrow with the City of Vallejo, or with a bank acceptable to the City of Vallejo, securities equivalent to the amount withheld. The Contractor shall be beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon.
Upon satisfactory completion of the Contract, the securities shall be returned to the Contractor.
Alternatively, upon the Contractor's request, the City of Vallejo will make payment of retentions earned directly to the escrow agent. The Contractor may direct the investment of the payments into securities, and the Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by the Contractor.
Upon satisfactory completion of the Contract, the Contractor shall receive from the escrow agent all securities, interest and payments received by the escrow agent from the City of Vallejo.
Alternatively, and subject to the acceptance by the City of Vallejo, the payment of retentions earned may be deposited directly with a person licensed under Division 6 (commencing with Section 17000) of the Financial Code as the escrow agent. Upon written request of an escrow agent that has not been approved by the City of Vallejo under subdivision (c) of Section 10263 of the Public Contract Code, the City of Vallejo will provide written notice to that escrow agent within 10 business days of receipt of the request indicating the reason or reasons for not approving that escrow agent. The payments will be deposited in a trust account with a Federally chartered bank or savings association within 24 hours of receipt by the escrow agent. The Contractor shall not place any retentions with the escrow agent in excess of the coverage provided to that escrow agent pursuant to subdivision (b) of Section 17314 of the Financial Code. In all respects not inconsistent with subdivision (c) of Section 10263 of the Public Contract Code, the remaining provisions of Section 10263 of the Public Contract Code shall apply to escrow agents acting pursuant to subdivision (c) of Section 10263 of the Public Contract Code.
Securities eligible for investment shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit or any other security mutually agreed to by the Contractor and the City of Vallejo.
The escrow agreement used pursuant to this Section 9-1.065 shall be substantially similar to the "Escrow Agreement for Security Deposits In Lieu of Retention" in Section 10263 of the Public Contract Code, deemed as incorporated herein by reference.
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-121
The Contractor shall obtain the written consent of the surety to the agreement.
9-1.07 PAYMENT AFTER ACCEPTANCE
After the work has been accepted in writing by the Director, as provided in Section 7-1.17, "Acceptance of Contract," payments will be made to the Contractor subject to the provisions in this Section 9-1.07.
9-1.07A PAYMENT PRIOR TO PROPOSED FINAL ESTIMATE
After acceptance of the work by the Director, the Engineer will make an estimate of the total amount of work done under the Contract and the City of Vallejo will make a final monthly payment pending issuance of the proposed final estimate. The City of Vallejo will pay the balance thereon found to be due after deduction of all previous payments, all amounts to be kept or retained under the provisions of the Contract and those further amounts that the Engineer determines to be necessary pending issuance of the proposed final estimate and payment thereon.
9-1.07B FINAL PAYMENT
After written acceptance of the Work as complete by the Director, or the Director’s designated representative, the Engineer will prepare and issue to the Contractor a proposed final estimate in writing of the total amount payable to the Contractor, including therein an itemization of the total amount, segregated as to Contract item quantities, extra work and any other basis for payment, and shall also show therein all deductions made or to be made for prior payments and amounts to be kept or retained under the provisions of the Contract. All prior estimates and payments shall be subject to correction in the proposed final estimate.
The Contractor shall submit written approval of the proposed final estimate or a written statement of all claims arising under or by virtue of the Contract so that the Engineer receives the written approval or statement of claims no later than close of business of the thirtieth day after receiving the proposed final estimate. If the thirtieth day falls on a Saturday, Sunday or legal holiday, then receipt of the written approval or statement of claims by the Engineer shall not be later than close of business of the next business day.
No claim will be considered that was not included in the written statement of claims, nor will any claim be allowed as to which a notice or protest is required unless the Contractor has strictly complied with the notice or protest requirements of the Contract Documents.
On the Contractor's approval, or if the Contractor files no claim within the specified period of 30 days, the Engineer will issue a final estimate in writing in accordance with the proposed final estimate submitted to the Contractor. The City of Vallejo will pay any remaining moneys unpaid and found to be due in the proposed final estimate 35 days after the recordation of the Notice of Completion in the records of the Solano County Recorder's Office as per Section 7-1.17, "Acceptance of Contract”. That final estimate H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-122
and payment thereon shall be conclusive and binding against Contractor on all questions relating to the amount of work done and the compensation payable therefor.
If the Contractor within the specified period of 30 days files claims, the Engineer will issue a semifinal estimate in accordance with the proposed final estimate submitted to the Contractor and within 30 days thereafter the City of Vallejo will pay the sum so found to be due. The semifinal estimate and payment thereon shall be conclusive and binding against the Contractor on all questions relating to the amount of work done and the compensation payable therefor, except insofar as affected by the claims filed within the time and in the manner required hereunder.
9-1.07C CLAIMS
The Claims procedures set forth in this section 9-1.07C are in addition to any claims procedures or rights available to Contractor pursuant to California Public Contract Code section 20104-20104.6 or California Public Contract Code section 9204 and Contractor’s exhaustion of its administrative remedies pursuant to this section 9-1.07C is a condition precedent to Contractor pursuing any claim pursuant to California Public Contract Code section 20104-20104.6 or California Public Contract Code section 9204 A. General. A “Claim” means a written demand or written assertion by Contractor to adjust, alter, modify, or otherwise change the Contract price or the Contract time, or both. All claims filed hereunder shall strictly comply with all requirements of the Contract Documents.
In order to qualify as a “Claim,” the written demand must state that it is a claim submitted under Section 9-1.07C of the Contract Documents. A letter, voucher, invoice, payment application, or other routine or authorized form of request for payment is not a Claim under the Contract Documents. If such a request is disputed as to liability or amount, then the disputed portion of the submission may be converted to a Claim under the Contract Documents by submitting a separate claim in compliance with claim submission requirements.
A Claim must be stated with specificity, including identification of the event or occurrence giving rise to the Claim, the date of the event, and the asserted affect on the Contract price and the Contract time, if any. The Claim shall include adequate supporting data. Adequate supporting data for a Claim for an adjustment of the Contract time shall include scheduling data demonstrating the impact of the event on the controlling operation and completion of the Project. Adequate supporting data for a Claim for an adjustment in the Contract price shall include a detailed cost breakdown of items included within the Claim and documentation supporting each item of cost.
Notwithstanding and pending the resolution of any Claim, the Contractor shall diligently prosecute the disputed work to final completion of the work. Contractor shall impose the Claim notice and documentation requirements in this Contract on
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-123
Contractor’s subcontractors of all tiers, and require them to submit to the Contractor all Claims against Contractor and/or City within the times and containing the documentation required by these provisions. The Claim notice and documentation procedure described in these provisions applies to all claims and disputes arising under the Contract Documents, whether or not specifically referred to in any specific portion of the Contract.
If additional information or details are required by the Engineer to determine the basis and amount of any Claims, the Contractor shall furnish additional information or details so that the additional information or details are received by the Engineer no later than the fifteenth day after receipt of the written request from the Engineer.
If the fifteenth day falls on a Saturday, Sunday or legal holiday, then receipt of the information or details by the Engineer shall not be later than close of business of the next business day. Contractor understands and agrees that failure to submit the information and details to the Engineer within the time specified shall be result in Contractor waiving that Claim.
The Contractor and all subcontractors shall keep full and complete records of the costs and additional time incurred for any work for which a Claim for additional compensation is made. The Engineer or any designated claim investigator or auditor shall have access to those records and any other records as may be required by the Engineer to determine the facts or contentions involved in the claims. Contractor agrees that failure to permit access to those records waives Contractor’s Claims.
The City of Vallejo, or its authorized representatives, shall have access, upon reasonable notice, during normal business hours, to Contractor and subcontractors' books, documents and accounting records, including but not limited to, bid worksheets, bids, subcontractor bids and proposals, estimates, cost accounting data, accounting records, payroll records, time sheets, canceled checks, profit and loss statements, balance sheets, project correspondence including but not limited to all correspondence between Contractor and its sureties and subcontractors/vendors, project files, scheduling information, and other records of the Contractor and all subcontractors directly or indirectly pertinent to the work, original as well as change and claimed extra work, to verify and evaluate the accuracy of cost and pricing data submitted with any change order, prospective or completed, or any claim for which additional compensation has been requested or claim has been tendered. Such access shall include the right to examine and audit such records, and make excerpts, transcriptions, and photocopies at City of Vallejo's cost.
The parties agree that in the event Contractor or any subcontractor fails to comply with this section, it would be difficult for the City of Vallejo to determine its actual damages; therefore, Contractor agrees to pay City of Vallejo, as liquidated damages, the sum of Two hundred fifty dollars ($250.00), which Contractor agrees is reasonable under the circumstances, for each and every calendar day which H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-124
Contractor or a subcontractor fails or refuses to provide the City of Vallejo, access to the documents, records and materials specified in this section.
B. Disputes
Contract Interpretation Disputes: Should it appear to the Contractor that the work to be performed or any of the matters relative to the Contract Documents are not satisfactorily detailed or explained therein, or should any questions arise as to the meaning or intent of the Contract Documents, the Contractor shall give written notice to the City of Vallejo. The Contractor shall bear all costs incurred in the giving of such notice.
All issues regarding the interpretation of the drawings or specifications shall be referred to the City for interpretation. The City shall have the right but not the obligation to affirm or disaffirm any interpretation of the drawings or specifications, which affirmance or disaffirmance shall be final. If the Contractor should disagree with the City’s decision, the Contractor’s sole and exclusive remedy is to file a Claim in accordance with these provisions.
Work Disputes: Should any dispute arise under the Contract Documents respecting the true value of any work performed, the implementation of the Work required by the Contract Documents, any Work omitted, any extra work which the Contractor may be required to perform or time extensions, respecting the size of any payment to the Contractor during the performance of the Contract Documents, or of compliance with Contract Documents procedures, the dispute shall be decided by the City of Vallejo and its decision shall be final and conclusive. If the Contractor disagrees with the City’s decision, the Contractor’s sole and exclusive remedy is to file a claim in accordance with these provisions.
C. Delays. As used herein, the following terms shall have the following meanings:
"Excusable Delay" means any delay of the completion of the Project beyond the expiration of the Contract time caused by conditions beyond the control and without the fault or negligence of the Contractor such as strikes, embargoes, fire, unavoidable casualties, unusual delays in transportation, national emergency, and stormy and inclement weather conditions in which the work cannot continue. The financial inability of the Contractor or any subcontractor and default of any subcontractor, without limitation, shall not be deemed conditions beyond the Contractor's control. An Excusable Delay may entitle the Contractor to an adjustment in the Contract time.
"Compensable Delay" means any delay of the completion of the work beyond the expiration date of the Contract time caused by the gross negligence or willful acts of the City of Vallejo, and which delay is unreasonable under the circumstances involved, and not within the contemplation of the parties. A Compensable Delay may entitle the Contractor to an extension of the Contract time and/or Contract
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-125
price. Except as provided herein, the Contractor shall have no claim for damage or compensation for any delay, interruption, hindrance, or disruption.
"Unexcusable Delay" means any delay of the completion of the Project beyond the expiration of the Contract time resulting from causes other than those listed above.
An Unexcusable Delay shall not entitle the Contractor to an extension of the Contract time or an adjustment of the Contract price.
The Contractor may make a Claim for an extension of the Contract time, for an Excusable Delay or a Compensable Delay, subject to the following:
1. If an Excusable Delay and a Compensable Delay occur concurrently, the maximum extension of the Contract time shall be the number of days from the commencement of the first delay to the cessation of the delay which ends last.
2. If an Unexcusable Delay occurs concurrently with either an Excusable Delay or a Compensable Delay, the maximum extension of the Contract time shall be the number of days, if any, by which the Excusable Delay or the Compensable Delay exceeds the Unexcusable Delay.
3. If an Unexcusable Delay occurs concurrently with both an Excusable Delay and a Compensable Delay, the maximum extension in the Contract time shall be the number of days, if any, by which the number of days determined pursuant to Subparagraph (a) exceeds the number of days of the Unexcusable Delay.
4. For a Compensable Delay, the Contractor shall only be entitled to an adjustment in the Contract Sum in an amount equal to: (1) the actual additional labor costs, material costs, and unavoidable equipment costs incurred by the Contractor as a result of the Compensable Delay, plus the actual additional wages or salaries and fringe benefits and payroll taxes of supervisory and administrative personnel necessary and directly employed at the Project site for the supervision of the work during the period of Compensable Delay; or (2) the Contractor’s Daily Delay Damages set forth in the Bid Form, whichever is less. Except as provided herein, the Contractor shall have no claim for damage or compensation for any delay, interruption, hindrance, or disruption. There shall be no Compensable Delay unless the event or occurrence giving rise to the Compensable Delay extends the actual completion of the Project past the Contract time.
The parties agree that the City of Vallejo's exercise of its right to order changes in the work, regardless of the extent and number of changes, or to suspend the work, is within the contemplation of the parties and shall not be the basis for any Claim for Compensable Delay. The rights of the Contractor to adjustments of the Contract time and the Contract sum, based on changes ordered in the work or
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-126
suspension of the work, shall be governed by this provision.
Notwithstanding the making of any Claim or the existence of any dispute regarding any Claim, Contractor shall not cause any delay, cessation, or termination in or of Contractor's performance of the work, but shall diligently proceed with performance of the work in accordance with the Contract Documents.
Contractor agrees that the daily Contractor Daily Delay Damages as set forth in the Proposal Form shall be full compensation to Contractor, all subcontractors and anyone for whom they may be legally responsible, for each day of delay that may be caused by City of Vallejo or anyone for whom City of Vallejo is legally responsible, including but not limited to, extended field costs, extended home overhead costs, impact, inefficiency, unabsorbed home office overhead, underabsorbed home office overhead, hindrance, disruption or any other damage arising from delay, no matter how characterized and regardless of the cause, extent or duration of the delay. Inclusion of Contractor Daily Delay Damages within the Proposal Form is solely for the purpose of determining the low Bidder and establishing the City of Vallejo’s maximum daily liability as a result of City of Vallejo delays to Contractor, if any, and City of Vallejo has no obligation to pay any Contractor Daily Delay Damages except as provided for in these Contract Documents for Compensable Delays. In the event that City of Vallejo becomes liable to Contractor for compensable delays, City of Vallejo agrees to pay Contractor the Daily Delay Damages set forth in the Proposal Form or Contractor’s actual daily delay damages, whichever is less, for each day of Compensable Delay as provided for by these Contract Documents.
D. Claim Procedures. Should any clarification, determination, action or inaction by the City, Work, or any event, in the opinion of the Contractor, exceed the requirements of or not comply with the Contract Documents, or otherwise result in the Contractor seeking additional compensation in time or money for any reason (collectively “Disputed Work”), then the Contractor and the City shall make good faith attempts to resolve informally any and all such issues and/or disputes. The Contractor must file a written Notice of Potential Claim with the City on the form provided in the Contract Documents before commencing the Disputed Work, or within seven (7) calendar days after Contractor’s first knowledge of the Disputed Work, whichever is earlier, stating clearly and in detail its objection and reasons for contending the Work or interpretation is outside the requirements of the Contract Documents. If a written Notice of Potential Claim is not filed within this time period, or if the Contractor proceeds with the Disputed Work without first having filed the notice required by these provisions, the Contractor shall waive any rights to further claim on the specific issue.
The City will review the Contractor’s timely Notice of Potential Claim and provide a decision. The City may require supplemental information from the Contractor to clarify that contained in the Notice of Potential Claim. If, after receiving the City’s decision, the Contractor disagrees with the decision, the Contractor shall so notify H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-127
the City, in writing, within seven (7) calendar days after receiving the decision, that a formal Claim will be filed. The Contractor shall submit the Claim in the form specified herein and all arguments, justification, costs or estimates, schedule analyses, and detailed documentation supporting the Contractor’s position within thirty (30) calendar days after receiving the City’s decision on the Notice of Potential Claim. The Contractor’s failure to furnish notification within seven (7) calendar days and all justifying documentation within thirty (30) calendar days will result in the Contractor waiving all rights to the subject Claim.
If Disputed Work persists longer than thirty (30) calendar days after receiving the City’s decision on the Notice of Potential Claim, then the Contractor shall, every thirty (30) calendar days until the Disputed Work ceases, submit to the City a document titled “Claim Update” which shall update and quantify all elements of the Claim as completely as possible. The Contractor’s failure to submit a Claim Update or to quantify all costs and impacts every thirty (30) days shall result waiver of that portion of the Claim for that thirty (30) day period. Claims or Claim Updates stating that damages will be determined at a later date shall not comply with the requirements of these provisions and shall result in the Contractor waiving such Claim(s) and/or Claim Updates.
All Claims must be submitted to Engineer before the issuance of the final estimate.
Contractor hereby expressly waives all Claims not submitted, in complete and proper form, on or before the date of issuance of the final estimate.
Upon receipt of the Contractor’s formal Claim including all arguments, justifications, costs or estimates, schedule analyses, and documentation supporting the Contractor’s position as previously stipulated, the City or its designate will review the Claim and render a final determination. If the Contractor’s Claims at project completion total less than $375,000, then claims resolution shall proceed in the manner prescribed by Article 1.5, Chapter 1, Part 3 of Division 2 of the California Public Contract Code.
Claims shall be calculated in the same manner as extra work using the procedures set forth in Section 9-1.03 “Force Account Payment.” This method applies in all cases of Claims, regardless of type, whether in negotiation, arbitration, litigation, and even applies in the event of fault, negligence, strict liability, or tort claims of all kinds, including strict liability or negligence. No other costs arising out of or connected to with the performance of Claims, of any nature, may be recovered by the Contractor. Except where provided by law, or elsewhere in these Contract Documents (if applicable), the City shall not be liable for special or consequential damages, and Claims shall not include special or consequential damages.
Contractor shall be limited in its recovery on Claims to the calculations set forth in Section 9-1.03 of these provisions.
E. Claim Format. The Contractor shall submit the Claim justification in the following format:
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-128
1. Cover letter and certification of the accuracy of the contents of the Claim;
2. Summary of Claim including underlying facts, entitlement, quantum calculations and Contract Document provisions supporting relief;
3. List of documents relating to Claim including drawings, specifications, clarifications/requests for information, schedules and others;
4. Chronology of events and correspondence;
5. Analysis of Claim merit;
6. Analysis of Claim costs;
7. Attached supporting documents referenced in Item 3.) above.
F. Exclusive Remedy. The Contractors performance of its duties and obligations specified in these provisions and submission of a Claim as provided in these provisions is the Contractor’s sole and exclusive remedy for the payment of money, extension of time, adjustment or interpretation of Contract Documents terms or other contractual or tort relief arising from the Contract Documents. This exclusive remedy and the limitation of liability (expressed herein and elsewhere throughout the Contract Documents) apply notwithstanding the completion, termination, suspension, cancellation, breach or rescission of the Work or the Contract Documents, negligence or strict liability by the City of Vallejo, its representatives, consultants or agents, or the transfer of the Work or the Project to the City for any reason whatsoever. The Contractor waives all claims of waiver, estoppel, release, bar, or any other type of excuse for non-compliance with the Claim submission requirements. Compliance with the notice and Claim submission procedures described in these provisions is a condition precedent to the right to commence litigation, file a Government Code Claim, or commence any other legal action. No Claim or issues not raised in a timely protest and timely Claim submitted under these provisions may be asserted in any Government Code Claim, subsequent litigation, or legal action. The City of Vallejo shall not have deemed to waive any provision under this Section, if at the City’s sole discretion, a Claim is accepted in a manner not in accord with this Section.
G. Mediation. All Claims not subject to the Claim resolution procedures set forth in these provisions shall, as a condition precedent to litigation thereon, first be mediated. Mediation shall be non-binding and utilize the services of a mediator mutually acceptable to the parties, and, if the parties cannot agree, a mediator selected by the American Arbitrator Association from its panel of approved mediators trained in construction industry mediation. All statutes of limitation shall be tolled from the date of the demand for mediation until a date two weeks following the mediation’s conclusion. All unresolved claims shall be submitted to the same H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-129
mediator. The cost of mediation shall be equally shared. 9-1.075 FALSE CLAIMS
California Penal Code section 72, provides that any person who presents for payment with intent to defraud any district board or officer, any false or fraudulent claim, bill, account, voucher, or writing, is punishable by fines not exceeding ten thousand dollars ($10,000.00) and/or imprisonment in the state prison.
Government Code sections 12650, et seq., pertains to civil penalties that may be recovered from persons (including corporations, etc.) for presenting a false claim for payment or approval, presents a false record or statement to get a false claim paid or approved, or other acts, to any officer or employee of any political subdivision of the State of California. Any person or corporation violating the provisions of Government Code sections 12650, et seq., shall be liable for three times the amount of the damages of the political subdivision, plus a civil penalty, plus costs.
All Claims by Contractor, shall include the following certification, properly completed and executed by Contractor or an officer of Contractor:
I, __________________, BEING THE _________________ (MUST BE AN OFFICER) OF _____________________ (CONTRACTOR), DECLARE UNDER PENALTY OF
PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA, AND DO PERSONALLY CERTIFY AND ATTEST THAT: I HAVE THOROUGHLY REVIEWED
THE ATTACHED CLAIM FOR ADDITIONAL COMPENSATION AND/OR EXTENSION
OF TIME, AND KNOW ITS CONTENTS, AND SAID CLAIM IS TRUTHFUL AND ACCURATE; THAT THE AMOUNT REQUESTED ACCURATELY REFLECTS THE CONTRACT ADJUSTMENT FOR WHICH THE OWNER IS LIABLE; AND, FURTHER, THAT I AM FAMILIAR WITH CALIFORNIA PENAL CODE SECTION 72 AND CALIFORNIA GOVERNMENT CODE SECTION 12650, ET SEQ, PERTAINING TO
FALSE CLAIMS, AND FURTHER KNOW AND UNDERSTAND THAT SUBMISSION OR
CERTIFICATION OF A FALSE CLAIM MAY LEAD TO FINES, IMPRISONMENT AND/OR OTHER SEVERE LEGAL CONSEQUENCES.
Contractor agrees that submission of a Claim, in strict conformance with all of the requirements of this Contract, and rejection of all or part of said Claim by City of Vallejo, is a condition precedent to any action by Contractor against City of Vallejo, including but not limited to, the submission of a claim pursuant to Government Code section 900, et seq., and the filing of a lawsuit.
Any claim for overhead type expenses or costs, in addition to being certified as stated above, shall be supported by an audit report of an independent Certified Public Accountant provided by Contractor with the claim.
Contractor agrees that any costs or expenses incurred by the City of Vallejo in reviewing or auditing any claims that are not supported by the Contractor's cost accounting or other H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-130
records, or the Contract, shall be deemed to be damages incurred by the City of Vallejo within the meaning of the California False Claims Act.
Upon final determination of the claims, the Engineer will then make and issue the Engineer's final estimate in writing and within 30 days thereafter the City of Vallejo will pay the entire sum, if any, found due thereon. That final estimate shall be conclusive and binding against Contractor on all questions relating to the amount of work done and the compensation payable therefor.
9-1.08 (BLANK)
9-1.09 CLERICAL ERRORS
Notwithstanding the provisions in Section 9-1.07, "Payment After Acceptance," for a period of 3 years after acceptance of the work, all estimates and payments made pursuant to Section 9-1.07, including the final estimate and payment, shall be subject to correction and adjustment for clerical errors in the calculations involved in the determination of quantities and payments. The Contractor and the City of Vallejo agree to pay to the other any sum due under the provisions of this Section 9-1.09, provided, however, if the total sum to be paid is less than $200, no payment shall be made. 9-1.10 (BLANK)
9-1.11 CONTRACTOR NOT AN AGENT OF THE CITY OF VALLEJO
The right of general supervision shall not make the Contractor an agent of the City of Vallejo, and the liability of the Contractor for all damages to persons or to public or private property arising from the performance of the work shall not be lessened because of such general supervision.
9-1.12 THIRD-PARTY CLAIMS
The Contractor shall be responsible for all third-party claims, and for costs or injuries incurred by a third party which result from the operations of the Contractor, or its performance under the Contract.
9-1.13 GUARANTEE
Should any failure of the work occur within a period of one year after recordation of the notice of completion of the project or portions thereof, which can be attributed to faulty materials, poor workmanship, or defective equipment, the Contractor shall promptly make the needed repairs at Contractor's expense.
The City of Vallejo is hereby authorized to make such repairs if the Contractor fails to make or undertake with due diligence the aforesaid repairs within ten (10) days after Contractor is given written notice of such failure and without notice to the surety provided,
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-131
however, that in case of emergency where, in the opinion of the City of Vallejo, delay would cause serious loss or damages, or a serious hazard to the public, the repairs may be made or lights, signs, and barricades erected, without prior notice to the Contractor or surety, and the Contractor shall pay the entire costs thereof.
9-1.14 MISCELLANEOUS PROVISIONS
This Contract shall bind and inure to the heirs, devisees, assignees, and successors in interest of Contractor, and to the successors in interest of City of Vallejo, in the same manner as if such parties had been expressly named herein.
This Contract shall be governed by the laws of the State of California.
If any one or more of the provisions contained in the Contract should be invalid, illegal, or unenforceable in any respect, the validity, legality, and enforceability of the remaining provisions contained herein shall not in any way be affected or impaired thereby.
This Contract constitutes the full and complete understanding of the parties, and supersedes any previous agreements or understandings, oral or written, with respect to the subject matter hereof. The Contract may only be modified by a written instrument signed by both parties.
Contractor hereby assigns to City of Vallejo all its first-tier subcontracts now or hereafter entered into by Contractor for performance of any part of the work. The assignment will be effective upon acceptance by City of Vallejo in writing, and only as to those subcontracts which City of Vallejo designates in writing. Such assignment is part of the consideration to City of Vallejo for entering into the Contract with Contractor, and may not be withdrawn.
The provisions of the Contract Documents shall be included in all subcontracts.
9-1.15 PUBLIC CONTRACT CODE SECTION 20104, ET SEQ.
Public Contract Code section 20104, et seq., requires that the following language be set forth in the specifications:
§ 20104. Application of article; provisions included in plans and specifications
(i) (1) This article applies to all public works claims of three hundred seventy-five thousand dollars ($375,000) or less which arise between a contractor and a local agency.
(2) This article shall not apply to any claims resulting from a contract between a contractor and a public agency when the public agency has elected to resolve any disputes pursuant to Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2.
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-132
(ii) (1) "Public work" has the same meaning as in Sections 3100 and 3106 of the Civil Code, except that "public work" does not include any work or improvement contracted for by the state or the Regents of the University of California.
(2) "Claim" means a separate demand by the contractor for (A) a time extension, (B) payment of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (c) an amount the payment of which is disputed by the local agency.
(iii) The provisions of this article or a summary thereof shall be set forth in the plans or specification for any work which may give rise to a claim under this article. (iv) This article applies only to contracts entered into on or after January 1, 1991. § 20104.2. Claims; requirements; tort claims excluded
For any claim subject to this article, the following requirements apply:
(v) The claim shall be in writing and include the documents necessary to substantiate the claim. Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims. (vi) (1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant.
(3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater. (vii) (1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-133
any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant.
(3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater.
(viii) If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(ix) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division
3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. (x) This article does not apply to tort claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code.
§ 20104.4. Civil action procedures; mediation and arbitration; trial de novo; witnesses The following procedures are established for all civil actions filed to resolve claims subject to this article:
(i) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator,
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-134
shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties.
If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator.
(ii) (1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds.
(3) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo.
(4) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process.
§ 20104.6. Payment on undisputed portion of claim; interest on arbitration awards or judgments
(a) No local agency shall fail to pay money as to any portion of a claim which is undisputed except as otherwise provided in the contract.
In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law.
9/1.16 Public Contract Code section 9204
Public Contract Code section 9204 requires that the following language be set forth in the
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-135
specifications:
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity.
(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-136
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-137
of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-138
against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor.
A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
H:\ENGR\CIP\9408 EV Charging-Parking Structure\2 - Fleming Hill and Corp Yard\05 - RFP Design\01 - Advertisement\Section B_PW 9408.docx
B-139
Vallejo City-Fleet Electric Vehicle Charging Stations Project PW 9408
C-1
SECTION C - WAGE AND EQUIPMENT RATES
1. Prevailing Wage Rates
I
n accordance with the provisions of Section 1770 of the Labor Code of the State of California, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages applicable to the work to be done, and a current copy of said prevailing wages is on file with the City Clerk. Should the minimum Federal Wage Rate be higher than the rate determined by the Director of the Department of Industrial Relations, then the Federal Wage Rate Determination shall govern.
T
he successful bidder will be required to post a copy of these general prevailing rates of per diem wages in a conspicuous place at the job site forthwith upon undertaking the public work called for herein.
I
n addition, the City Charter of the City of Vallejo requires that the Contractor and all his/her Subcontractors shall pay their employees on said work a salary or wage at least equal to the prevailing salary or wage for work of similar character in the locality in which the public work is performed. The Contractor shall, as a penalty, forfeit to the City FIFTY DOLLARS ($50.00) for each calendar day or portion thereof, for each employee paid less than the prevailing salary or wage for any public work done under the contract by him/her or any subcontractor under him/her.
T
he State Labor Code states that for violations of public works laws relating to payment of prevailing wages, the City of Vallejo will be required to withhold from any progress payments owed to a contractor any amounts that have been forfeited as penalties, or as wages owed to employees, who have not been paid the prevailing wage for work performed. Effective 1/1/93, the City is required to directly transfer all withheld wages and penalties to the Labor Commissioner for disbursement in those cases where a contractor fails to bring a lawsuit for amounts withheld within 90 days after the completion of the public works contract and formal acceptance of the job by the City.
A
lso, the Labor Commissioner is permitted to intervene in any lawsuit brought by the contractor against an awarding body for recovery of amounts withheld. In the event that the contract does not prevail in the lawsuit to recover the amounts withheld, the wages and penalties will then be forwarded to the Labor Commissioner for disbursement in the manner previously described.
2. Payroll Record
I
n accordance with the provisions of Section 1776 of the Labor Code of the State of California, the Contractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and Vallejo City-Fleet Electric Vehicle Charging Stations Project PW 9408
C-2
overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by the Contractor in connection with this project. This payroll record shall be certified and available for inspection at all reasonable hours at the principal office of the successful bidder and a certified copy shall be furnished within ten (10) days after receipt of a written request by the following parties:
A. A n e
mployee or his/her authorized representative
B. C
ity's representative
C. R
epresentative of Labor Standard Enforcement and Division of Apprenticeship Standard of Department of Industrial Relations.
A
ny copy of the payroll record made available for inspection and furnished to the public through the above entities shall not disclose names, addresses or social security numbers of individual employees except the name and address of the Contractor.
I
n the event of non- compliance with the requirement of this subdivision, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notices from the State or City. If the non- compliance is still eviden t after the ten-day period, the Contractor shall, as a penalty, forfeit to the City TWENTY- FIVE DOLLARS ($25.00) for each calendar day, for each employee, until strict compliance is effectuated.
3. Equipment Rental Rates
E
quipment rental will be paid for as provided under Section 9- 1.03A of the State Standard Specifications at the rates listed in the EQUIPMENT RENTAL RATES TABLE of the State of California, Department of Public Works, Division of Highways, latest issue, for use in their Special Provisions, a copy of which Table of Rates is filed in the City Engineer's Office.
Vallejo City-Fleet Electric Vehicle Charging Stations Project PW 9408
C-3
STATE OF CALIFORNIA - DEPARTMENT OF INDUSTRIAL RELATIONS
DIVISION OF APPRENTICESHIP STANDARDS
T
O: California Department of Industrial Relations
Division of Apprenticeship Standards
P.O. Box 603
San Francisco, CA 94101
F
ROM: City of Vallejo
Public Works Department
P.O. Box 3068
Vallejo, CA 94590
8336
90000
A c
ontract to perform public works under Labor Code §1777.5 has been awarded to:
Name of General Contractor: Contractor's License Number:
Mailing Address: City:
Zip code: Telephone Number:
( )
Address or Location of Work Site (include City and/or County):
Contract or Project Number: Dollar Amount of Contract Award:
Starting Date (Estimated or Actual)
Month Day Year
/ /
Completion Date (Estimated or Actual)
M
onth Day Year
/ /
Number of Working Days:
Type of Construction (Highway, school, hospital, etc): G NEW CONSTRUCTION G ALTERATIONS Classification or Type of Workman (Carpenter, Plumber, etc.):
Is language included in the Contract Award to effectuate the provisions of Section 1777.5 as required by the Labor Code? G YES G NO
I
s Language included in the Contract Award to effectuate the provisions of Section 1776 as required by the Labor Code? G YES G NO
Signature: Title: Date:
Printed or Typed Name: Telephone Number:
( )
D
uplication of this form is permissible DAS 13 (RV. 7/85) Vallejo City-Fleet Electric Vehicle Charging Stations Project PW 9408
C-4
S
TATE OF CALIFORNIA
Gavin Newsome, Governor
D
EPARTMENT OF INDUSTRIAL RELATIONS
Lloyd Aubry, Director
CALIFORNIA DIVISION OF APPRENTICESHIP STANDARDS
Robert Stranberg, Chief Deputy Director
P.O. Box 420603
San Francisco, CA 94142
Telephone (415) 703-4251
D
ISTRICT OFFICES ADDRESS TELEPHONE
F
resno 93721 2550 Mariposa Street, Room 3080 ( 209) 445-5431 Los
Angeles 90012 107 South Broadway, Room 5034 ( 213) 897-1385 O
akland 94621 7700 Edgewater Drive, Suite 327 (510) 729-5170 S
acramento 95825 2424 Arden Way, Suite 160 (916) 920-6111 S
an Jose 95113 100 Paseo De San Antonio, Room 125 (408) 277-1273 S
anta Ana 92701 28 Civic Center Plaza, Room 525 ( 714) 558-4126 Section_D_Tech_PW9408 SECTION D TECHNICAL SPECIFICATIONS – TABLE OF CONTENTS D-1
SECTION D: TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
PAGE
SECTION D.0100 - ORDER OF WORK ...................................................................... 3 SECTION D.0200 - DUST CONTROL ........................................................................ 8 SECTION D.0300 - MOBILIZATION ........................................................................... 9 SECTION D.0400 - CPM CONSTRUCTION SCHEDULES ........................................ 11 SECTION D.0500 - SUBMITTALS .............................................................................. 19 SECTION D.0600 - EXISTING UTILITIES .................................................................. 30 SECTION D.0700 - TRAFFIC AND ACCESS CONTROL ........................................... 35 SECTION D.0800 - CONSTRUCTION AREA SIGNS ................................................. 42 SECTION D.0900 - RECYCLING & WASTE MANAGEMENT PLAN (WMP) .............. 44 SECTION D.1000 - WATER POLLUTION CONTROL ................................................ 49 SECTION D.1050 - CLEARING AND GRUBBING ...................................................... 54 SECTION D.1060 - SITE PREPARATION .................................................................. 56 SECTION D.1070 - LINES AND GRADES .................................................................. 58 SECTION D.1200 - DEMOLITION .............................................................................. 60 SECTION D.1400 - ELECTRICAL .............................................................................. 62 SECTION D.1500 - AGGREGATE BASE ................................................................... 66 SECTION D.1600 - HOT MIX ASPHALT (TYPE A) .................................................... 68 SECTION D.1700 - CONCRETE ................................................................................ 78 SECTION D.1900 - SIGNING, STRIPING AND PAVEMENT MARKING .................... 86 SECTION D.2300 - EARTHWORK ............................................................................. 90 SECTION D.2315 - UTILITY EARTHWORK ............................................................... 95 Section_D_Tech_PW9408 SECTION D TECHNICAL SPECIFICATIONS – TABLE OF CONTENTS D-2
PW9408 SECTION D.0100 ORDER OF WORK
D-3
SECTION D.0100 - ORDER OF WORK
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Order of work shall conform to the provisions in Section B 5-1.05A, “Order of Work” and these technical specifications. Hours of work shall conform to the provisions in Section B 5-1.05B, “Hours of Work” and these technical specifications.
B. Attention is directed to paragraph 5 and 6 of Section B 8-1.01, “Subcontracting”
C. Attention is directed to Section B 7-1.04, “Permits and Licenses”.
Immediately upon award of the Contract the Contractor shall apply for and obtain any permits necessary to complete this project.
D. Attention is directed to Maintaining Traffic elsewhere in these technical specifications.
E. Contractor shall not start work until after a receipt of a Notice to Proceed issued by the City Engineer. The Contractor shall notify the City of Vallejo 3 weeks prior to the intended start date.
F. All trucks transporting materials shall use approved City Truck Routes as shown on City Standard Drawing 2-06.
PART 2 MATERIALS
NOT APPLICABLE
PART 3 EXECUTION
3.01 NOTICE TO AFFECTED PARTIES
A. The Contractor is to provide written notice to all affected parties of the dates and times that there will be restricted street access and parking adjacent to their parcel. The Contractor shall give a minimum of 72 hours advance notice prior to beginning work adjacent to affected parcels / businesses.
Failure to distribute notices shall be sufficient cause for the Engineer to suspend the work until such notices are distributed.
B. The notices shall include the Contractor’s name and contact information for the Contractor’s foreman, the City Engineer’s contact information, relevant locations and dates of restricted access, a description of landscaping and improvements that may be affected and/or removed and a statement that PW9408 SECTION D.0100 ORDER OF WORK
D-4
owners/residents have the right to salvage all such existing landscaping, improvements and/or materials that the Contractor may remove to facilitate construction within the right of way. The content, format, and method of delivery of such notices shall be approved by the Construction Manager prior to distribution. The Contractor is advised that notices shall not be placed in mailboxes as it is a violation of Federal Postal regulations.
C. The following shall be considered as affected parties:
1. Residents and owners who front on or are contiguous to the Project limits.
2. Residents and owners who have an ingress/egress route only from within the Project limits.
D. Notification shall be via signs posted on barricades along edge of roadway where applicable. Text shall be as approved by the Engineer. As schedules change, affected areas shall be re-notified / reposted in the above manner as often as is necessary and as directed by the Engineer at no additional cost to the City.
E. The contractor shall furnish and install “No Parking” signs a minimum of 72 hours in advance with dates and times where there will be parking restrictions or closures.
3.02 DOCUMENTATION OF EXISTING CONDITIONS
A. The Contractor shall photograph and video in sufficient detail to show all areas of the project, including but not limited to the existing sidewalk, driveways, roadway, owner/resident landscaping and improvements behind the back of walk, staging areas, routes of ingress and egress, and all other areas the Contractor believes are appropriate.
B. The photographic prints and video shall be dated and a copy shall be delivered to the City Engineer within one (1) week of the date of preparation and prior to beginning of work.
C. If, during the course of the project, the Contractor occupies areas or routes different from those documented prior to the beginning of work, the Contractor shall record and deliver supplemental documentation of existing conditions as described above.
D. After all work is completed but prior to the final acceptance of the project, the Contractor shall record and deliver documentation of the work in a similar manner as described for the existing conditions above.
3.03 PRESERVATION OF EXISTING FACILITIES
PW9408 SECTION D.0100 ORDER OF WORK
D-5
A. Attention is directed to Section 7-1.11, Preservation of Property, Section B General Provisions. Due care shall be exercised to avoid injury to existing street and highway improvements or facilities, utility facilities, adjacent property, and roadside trees, shrubs and other plants that are not to be removed.
B. The Contractor shall contact Underground Service Alert far enough in advance so that all utilities are marked prior to beginning work. Contractor shall be aware that PG&E, AT&T and Comcast utility companies have limited personnel to mark their utility lines. As such, Contractor shall coordinate its request to accommodate the output that can be provided by the individual utility company.
C. The Contractor shall provide a sufficient number of reference points to re- establish the existing alignment and locations of existing pavement delineations after paving has occurred. The references shall also include the limits or changes in striping pattern, including one and two-way barrier lines, limit lines, crosswalks and other pavement markings, where it is not apparent or clear in the striping drawings.
D. The Contractor shall take necessary measures to protect existing roadway utility boxes, vaults, manhole rims, posts and any other structures, from damage or defacing by construction equipment, asphalt, concrete, tack oil, striping products, etc.
E. The Contract shall take necessary measures to protect existing facilities that are to be removed and salvaged or removed and replaced as directed on the drawings. It is the Contractor’s responsibility to ensure that these materials are not damaged during the removal and/or storage and will remain responsible for these items until such time as they are reinstalled to the satisfaction of the City Engineer or the City takes possession of them. If any damage to these items occurs while they are in the Contractor’s possession, the Contractor shall replace them with like items at a similar or better quality as approved by the City. Any replacement costs will be incurred by the Contractor at no cost to the City.
3.04 SEQUENCE OF WORK
A. The Contractor shall conduct operations so as to offer the least possible obstruction and inconvenience to the public and it shall have under construction no greater portion of work than it can prosecute properly and with due regard to the safety, rights, and convenience of the public. It shall be the intent of these technical specifications to require the restoration of streets, sidewalks, landscaped areas and other work areas to their original condition and former state of usefulness as soon as practicable upon completion of a portion of the work. Truck and equipment operators shall exercise increased alertness and reduced speed when driving through the
PW9408 SECTION D.0100 ORDER OF WORK
D-6
project area with respect to pedestrians, roadway curves, hills and blind spots.
B. Other work such as potholing for utility verification, over-excavation, and lowering or raising utility covers may be performed outside of the required work phasing, as decided by the contractor.
3.05 RESIDENTIAL GARBAGE COLLECTION
A. The Contractor shall schedule proposed work so that cold planing, paving and road closures do not coincide with garbage collection days. For all other work scheduled on garbage collection days, the Contractor shall work around garbage bins placed on frontage by residents and facilitate the placement of the bins within and around the areas of work. The Contractor shall contact Recology Vallejo at 707-552-3110 to determine which day garbage will be collected from the street for work coordination purposes before work commences.
3.06 PORTABLE WATER VEHICLES
A. The Contractor shall provide and operate a portable water vehicle to deliver water for construction and materials such as aggregate base rock, for equipment and general airborne dust control. The Contractor shall be continuously prepared throughout the course of the project to immediately mitigate airborne dust nuisance. Full compensation for furnishing, hauling and operating a portable water vehicle (such as a water truck or a water tank trailer) shall be considered as included in the various Contract items of work and no additional payment will be made therefor.
3.07 ADMINISTRATIVE ITEMS
1. Pre-Construction Meetings – The Contractor shall coordinate pre- construction meetings with the City and subcontractors that will perform the demolition and / or the concrete and asphalt removal. The meetings shall occur prior to mobilization and beginning of the particular work.
2. Contractor’s Daily Roster and Manifests – The Contractor shall provide on a daily basis to the City Inspector, a list of all worker names, crafts and equipment involved with the project. In addition, the Contractor shall collect and upon request by City Inspector, immediately provide any and all materials tags or manifests.
3. Extra Work Statements – Extra work statements submitted to the City by the Contractor shall include manpower classifications, and applicable fringe benefit amounts, surcharges and markups in the calculation of charges. The Contractor is reminded that authorization must be granted by the Engineer prior to beginning any extra work on force account.
PW9408 SECTION D.0100 ORDER OF WORK
D-7
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor.
END OF SECTION
PW9738 SECTION D.0200 DUST CONTROL
D-8
SECTION D.0200 - DUST CONTROL
PART 1 GENERAL
1.01 SCOPE OF WORK
A. The Contractor shall provide a continuously available source of water for dust control during the work. Dust control shall conform to the provisions in Section 14, “Dust Control,” of the Standard Specifications and these technical specifications.
PART 2 MATERIALS
NOT APPLICABLE
PART 3 EXECUTION
3.01 DUST CONTROL
A. When necessary or when directed by the Engineer, the Contractor shall apply water for laying dust. Water shall be applied by means of pressure- type distributors equipped with a spray system that will insure a uniform application. The Contractor shall provide and operate a portable water vehicle to deliver water for construction and materials such as aggregate base rock, for equipment and general airborne dust control. The Contractor shall be continuously prepared throughout the course of the project to immediately mitigate airborne dust nuisance.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions, including furnishing, hauling, and operating a portable water vehicle, shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.0300 MOBILIZATION
D-9
SECTION D.0300 - MOBILIZATION
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Mobilization shall consist of preparatory work and operations, including but not limited to those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, including administration, overhead, bonds, insurance and incidentals; for the establishment of all facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various Contract items on the project site. Mobilization shall include de-mobilization of equipment and personnel upon completion of construction.
B. The Contractor shall insure that adequate existing sanitation facilities are available or the Contractor shall provide and maintain adequate sanitation facilities. All wastes and refuse from sanitary facilities provided by the Contractor’s operations shall be disposed of away from the site in accordance with all laws and regulations pertaining thereto.
PART 2 EXECUTION
2.01 MOBILIZATION
A. Mobilization shall conform to the provisions in Section 9-1.16, “Mobilization,” of the Standard Specifications and these technical specifications.
2.02 STAGING
A. Contractor’s construction equipment materials and required toilet facilities are not allowed to remain within the public right-of-way outside of regular working hours. Toilet facilities, as required by 8 CCR § 1526 must be removed from the public right-of-way after regular working hours. Contractor is recommended to utilize portable toilet facilities mounted on a trailer for easier relocation on a daily basis.
B. Staging areas must be approved by the City Engineer prior to the start of construction.
PART 3 MEASUREMENT AND PAYMENT
3.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions shall be considered as included in the prices paid for the various PW9408 SECTION D.0300 MOBILIZATION
D-10
contract items of work and no additional compensation will be allowed therefor. The work shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in mobilization, complete in place, including construction signs and Type III barricades, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
END OF SECTION
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-11
SECTION D.0400 - CPM CONSTRUCTION SCHEDULES
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall include the development of the initial Critical Path Method (CPM) construction schedule, and the monthly updating of the schedule (Progress Schedules) to reflect the progress of the work and any changes or modifications of the work during construction.
PART 2 MATERIALS
2.01 GENERAL
A. The initial CPM construction schedule and subsequent Progress Schedules shall be prepared using Microsoft Project 2010. The Contractor shall submit the initial CPM schedule, and each Progress Schedule, to the City in the form required in these specifications.
PART 3 EXECUTION
3.01 QUALIFICATIONS
A. The Contractor shall employ experienced scheduling personnel qualified in Critical Path Method scheduling techniques, and the use of Microsoft Project 2010. The Contractor may employ such personnel directly or may employ a services consultant for this purpose. After bid opening, the apparent successful low bidder shall provide the City with a written verification that the Contractor has the required personnel under its employ or that the Contractor will utilize a qualified CPM scheduling consultant. The written statement shall identify the individual who will perform CPM scheduling. The qualifications of the individual shall be verified by descriptions of construction projects on which the individual has successfully applied computerized CPM scheduling. The required level of experience shall include at least two projects of a similar nature, scope, and value. The written statement shall provide contact persons for referenced projects with current telephone and address information.
B. The City reserves the right to approve the Contractor’s scheduler, or consultant, and right to reject them at any time. The City also reserves the right to refuse replacement of the Contractor’s scheduler or consultant, if it believes such replacement will negatively affect performance of the Contract Documents.
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-12
3.02 GENERAL CPM SCHEDULE NOTES
A. The CPM construction schedule shall consist of an orderly and realistic plan for completion of the work. The CPM schedule shall include a series of activities and milestones, linked by relationships, set forth in a time-scaled manner. The CPM schedule shall be based on and incorporate milestone and completion dates specified in the Contract Documents. The overall time of completion and time of completion for each milestone shown on the CPM schedule shall adhere to times in the Contract Documents, unless an earlier (advanced) time of completion is requested by the Contractor and agreed to by the City. Any such agreement shall be formalized in a written Change Order. The City is not required to accept an earlier (advanced) schedule, i.e., one that shows completion dates earlier than that required in the Contract Documents. The Contractor shall not be entitled to additional compensation for completing the work prior to the completion date set forth in the Contract Documents, even if an earlier (advanced) time of completion is accepted by the City.
B. Neither the City nor the Contractor own float time. The Project owns the float time. As such, liability for delay of the Project Completion Date rests with the party whose unexcused delay, last in time, actually causes a delay to the Project Completion Date. For example, if Party A incurs an unexcused delay and uses some, but not all, of the float, and Party B later incurs an unexcused delay which uses all of the remaining float as well as additional time beyond the remaining float, then Party B shall be liable for the delay that represents a delay to the Completion Date. Party A would not be responsible for the delay to the Completion Date since it did not consume all of the float with its unexcused delay, and additional float remained, therefore, the Completion Date was unaffected by Party A.
C. The Progress Schedule shall be the basis for evaluating project progress, payment requests, and time extension requests. Responsibility for developing all Contract CPM schedules and monitoring actual progress as compared to the Progress Schedule rests with the Contractor.
D. Failure of the initial CPM schedule or Progress Schedules to include any element of the work or any inaccuracy in Progress Schedules shall not relieve the Contractor from responsibility for accomplishing the work in accordance with the Contract Documents. The City’s acceptance of schedules shall be for its use in monitoring and evaluating project progress, payment requests, and time extension requests, and shall not, in any manner, impose a duty of care upon the City, or act to relieve the Contractor of its responsibility for the means and methods of construction.
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-13
3.03 INITIAL CPM SCHEDULE
A. The Contractor shall submit the initial CPM schedule to the City for review at Pre-Design Conference and Pre-Construction conference.
The initial CPM schedule shall consist of a realistic, detailed proposal of how the Contractor will proceed with the orderly completion of the work, in conformance with the Contract Documents. By way of the Contractor assigning activity durations and proposing the sequence of the work, the Contractor agrees to utilize sufficient and necessary management of resources to perform the work in accordance with the schedule.
Submission of the Contractor’s schedule to the City shall not relieve the Contractor of total responsibility for scheduling, sequencing, and performing the work to comply with the Contract Documents, including dealing with adverse effects such as delays resulting from ill-timed work.
B. The initial CPM schedule shall be time-scaled. Each activity that requires actual labor to complete shall have a duration assigned, in working days.
Milestones, or zero-duration activities, can be assigned to major task completion points, such as Sewer Installation Complete, or single-event activities, such as Submittal of Pump Cut-Sheets.
C. The initial CPM schedule shall include all major activities pertaining to the completion of the work. Each activity will have a discrete activity name and number. No activity on the schedule shall have a duration of longer than fifteen (15) working days, with the exception of submittal, review and approval, fabrication, and procurement activities, unless otherwise approved by the City in writing.
D. All dependencies, or relationships, between activities shall be included in the initial CPM schedule. Only relationships of the Finish-to-Start and Start- to-Start type shall be used in the schedule.
E. The first activity on the schedule shall be a milestone activity corresponding to the award of Contract by the City Council. The last activity on the schedule shall be a milestone activity corresponding to the final acceptance of the project as complete by the City Council (Project Acceptance). All intervening activities shall have their start date linked directly to the Notice to Proceed, or to another activity that can be traced back to the Notice to Proceed.
F. The completion of each activity in the CPM schedule shall be linked to a subsequent activity or series of activities that can ultimately be traced to Project Acceptance. All activities, including predecessor activities proceeding through a Start-to-Start relationship to a successor activity, shall have a relationship subsequent to the completion of the predecessor activity that ultimately leads to Project Acceptance.
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-14
G. The CPM schedule shall clearly identify the activities that constitute the controlling operations, or Critical Path. Only one Critical Path from the Notice to Proceed activity to the Project Acceptance activity shall exist in the schedule. No more than twenty-five percent (25%) of the activities in the schedule shall be critical or near critical. Near critical is defined as having float of less than or equal to five (5) days.
H. City furnished materials, equipment, or activities playing a defined role in the project, if any, shall be identified as separate, individual activities. City review and/or processing activities shall be identified as separate, individual activities. The CPM schedule shall include the appropriate amount of time for submittals, City review of submittals, revisions to submittals, and re- review. The Contractor shall be responsible for any additional review cycles as a result of rejected submittals, without compensation for working days lost.
I. The CPM schedule shall include the procurement of major equipment or materials through receipt and inspection at the job site, including time for ordering, fabrication, delivery, and inspection. The CPM schedule shall show the dependencies (relationships) between procurement and construction.
J. The CPM schedule shall include a separate activity with a minimum of five (5) working days for City to develop a punch list after project completion.
Additionally, the CPM schedule shall include a separate activity with a minimum of five (5) working days for the Contractor to complete punch list activities. A minimum of ten (10) working days should be allotted between the project completion and project acceptance.
K. The CPM schedule shall show separate activities which identify periods of interface with utilities and other agencies.
L. Within ten (10) working days of the submittal of the initial CPM schedule, the City and the Contractor shall meet to review and discuss the initial CPM schedule, after the City has completed a review of the initial submittal. The City’s review and comment on the schedule will be limited to conformance with the Contract Documents and these specifications. The Contractor shall make the necessary corrections to the schedule to comply with the Contract Documents, and shall adjust the schedule to incorporate any missing information requested by the City. The Contractor shall resubmit the revised initial CPM schedule within five (5) working days of the meeting.
The resubmitted, revised schedule shall be considered as the “Original CPM Schedule”. The City may receive the Original CPM Schedule with no exceptions taken, or may require that the Contractor make additional revisions to the first updated CPM schedule (Progress Schedule).
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-15
M. The City reserves the right to require the Contractor to adjust, add to, or clarify any portion of the Original CPM Schedule which may later be discovered to be insufficient for monitoring the progress of the work or approval of partial payment requests. No additional compensation will be provided for such adjustments, additions, or clarifications.
N. Submittal of the Original CPM Schedule, and subsequent Progress Schedules, shall be understood to be the Contractor’s representation that the schedule meets the requirements of the Contract Documents and that work shall be executed in the sequence indicated on the schedule.
3.04 MONTHLY PROGRESS SCHEDULES
A. Progress Schedules shall conform to the provisions in Section 8-1.02, “Schedule,” of the Standard Specifications and these technical specifications.
B. The Contractor shall monitor progress of the work and shall update and adjust the schedule each month to reflect actual progress on schedule activities, any changes to activities, and the additional and/or subtraction of any activities due to change orders, additions, deletions, etc.
C. Each Progress Schedule submitted shall continue to show all activities, including those completed. Completed activities shall accurately reflect “as- built” information by showing when activities were actually started and actually completed.
D. Progress Schedules shall be submitted by the fifth working day of each month, with progress updated through the last calendar day of the previous month.
E. Within ten (10) working days of the submittal of the Progress Schedule, the City will complete a review and provide comments on the schedule. The City may reject the Progress Schedule, receive it with no exceptions taken, or may require that the Contractor make additional revisions to the next Progress Schedule.
F. The Progress Schedule will be utilized as part of the basis for the Contractor’s monthly application for payment. If the Progress Schedule is rejected, the Contractor’s application for payment will not be processed until the Progress Schedule has been revised, resubmitted, and either received with no exceptions taken or received with revisions to be made the following month.
3.05 SCHEDULE REVISIONS
A. Updating the schedule to reflect actual progress shall not be considered PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-16
revisions to the schedule. However, the CPM schedule is recognized as a dynamic tool which changes as new information is acquired. Therefore, it is anticipated that revisions to activity durations and sequences may be expected on a monthly basis as the project proceeds.
B. To reflect revisions to the schedule, the Contractor shall provide the City with a written revision request prior to incorporation into a Progress Schedule. The revision request shall consist of a narrative with an itemized, full description and reason for each revision to the schedule.
C. Schedule revisions shall not be incorporated into any Progress Schedule until the City has reviewed the revision request. The City may request additional information and justification for schedule revisions and the Contractor shall, within three (3) working days, provide the City with a complete written narrative response to the City’s request.
D. If the Contractor’s revision request is not accepted by the City, and the Contractor disagrees with the City’s position, the Contractor has seven (7) calendar days from receipt of the City’s letter rejecting the revision request, to provide a narrative providing full justification and explanation for the revision. The Contractor’s failure to respond in writing within seven (7) calendar days of the City’s letter rejecting the revision request shall be contractually interpreted as acceptance of the City’s position, and the Contractor waives its rights to subsequently dispute or file of claims regarding the City’s position.
3.06 RECOVERY SCHEDULE
A. If the Progress Schedule shows Project Completion, or any other specified milestone date, occurring after the date required in the Contract Documents, the Contractor shall submit to the City a proposed plan to recover the lost time. The proposed plan shall be in writing and shall include a written narrative of any activity revisions, sequence changes, and other revisions proposed. If the revisions include sequence changes, the Contractor shall submit a schedule diagram comparing the proposed revised sequence of work to the Original CPM Schedule.
B. The proposed revisions shall not be incorporated into the Progress Schedule until reviewed by the City. If the Contractor’s proposed revisions are not accepted by the City, the Contractor shall follow the procedures in paragraph 3.04.C and 3.04.D above.
3.07 SCHEDULE IMPACTS DUE TO CHANGE ORDERS, AND OTHER DELAYS A. When the Contractor is directed to perform additional work under a Change Order, the Contractor shall prepare and submit to the City within ten (10) working days from the direction to proceed, a Schedule Impact Statement (SIS). The SIS shall include both a written narrative and a schedule
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-17
diagram depicting any impacts the Contractor feels that the Change Order work will have on other project activities and on the Critical Path. The SIS schedule diagram shall show how the Contractor proposes to incorporate the changed work into the CPM schedule, and whether a time extension will be required. Time extensions will only be granted if the Contractor can show conclusively that the changed work impacts the Critical Path.
B. The City will review the Schedule Impact Statement to confirm that the Contractor’s logic behind projected impacts to the schedule is appropriate.
If the City concurs with the Contractor’s projected impacts, the Contractor shall incorporate the revisions into the next Progress Schedule, and the Contract Time will be appropriately adjusted, if required. If the City does not concur with the Contractor’s projected revisions, and they are not accepted by the City, the Contractor shall follow the procedures in paragraph 3.04.C and 3.04.D above.
C. The Contractor shall be responsible for all costs associated with the preparation of the Schedule Impact Statement, and the process of incorporating revisions into the Progress Schedule.
D. The Contractor is responsible for requesting time extensions for time impacts resultant from Change Orders that, in the opinion of the Contractor, impact the Critical Path of the current Progress Schedule. Failure of the Contractor to request time extensions, provide an SIS, or provide required Recovery Schedules will result in the Contractor waiving its right to a time extension and any costs to mitigate delays.
E. The City shall not be obligated to consider any time extension request unless requirements of the Contract Documents are complied with. Failure of the Contractor to perform in accordance with the current Progress Schedule shall not be excused by the submittal of SISs. If the Contractor does not submit an SIS within the required ten (10) working days for any Change Order, it is mutually agreed that the Change Order has no impact to the schedule and the Contractor does not require any time extensions for that Change Order.
3.08 SCHEDULE SUBMITTALS
A. A minimum of five (5) working days prior to commencing the work, the Contractor shall submit a baseline schedule to the Engineer. The Contractor shall not commence work without a City-approved baseline schedule.
B. The Contractor shall submit a two-week look-ahead schedule on a weekly basis as well as an updated progress schedule on a monthly basis.
Progress payments may be withheld for failing to comply with these scheduling requirements as determined by the Engineer.
PW9408 SECTION D.0400 CPM CONSTRUCTION SCHEDULES
D-18
C. Progress Schedules shall be submitted by the fifth working day of each month, with progress updated through the last calendar day of the previous month.
D. All CPM schedules shall be submitted by e-mail as a Microsoft Project 2010 file (mpp) and in portable document format (pdf).
E. Copies of a summary report shall be included in each submittal on 8-1/2 x 11-inch bond paper. The Summary report shall be sorted by activity number in ascending order, and shall include activity number; activity name; original duration; remaining duration; predecessor and successor activities for each activity, including relationship type; early and late start dates; early and late finish dates; and total float.
F. A network plot of the schedule shall also be included in each submittal on a maximum 36 x 42-inch bond paper, showing activity name, activity number, links between activities, and showing a single critical path from the first activity through the last activity in the schedule. The network plot shall be in color, with the Critical Path clearly shown in red.
G. The Contractor shall submit to the City four hard copies of all schedule submittals.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions shall be considered to be included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor.
END SECTION
PW9408 SECTION D.0500 SUBMITTALS
D-19
SECTION D.0500 - SUBMITTALS
PART 1 GENERAL
1.01 GENERAL
A. This Section describes the requirements for and types of submittals:
1. Submittal requirements specified in this section include shop drawings, product data, samples, and miscellaneous work related submittals.
2. At a minimum, the Contractor shall provide the following submittals, as well as those referenced in the applicable sections for each unit of work and as directed by the Engineer:
a. Emergency Names and Phone Numbers
b. CPM Schedules
c. Temporary Traffic Control Plan
d. Staging Area Map
e. Charging Stations
f. Construction Area Signs
g. Water Pollution Control Plan (WPCP)
h. Hot Mix Asphalt
i. Class 2 Aggregate Base
j. Concrete Mix Design
B. Engineer's Review:
1. Intent of Engineer's review of shop drawings is to give a preview in an effort to foresee unacceptable materials or assemblies and to avoid the possibility of their rejection at the Project Site.
2. Engineer will review submittals only for conformance with the design concept of the Project and with the information given in the Contract Documents.
3. The Engineer's review of shop drawings will be general and shall not be construed:
a. As relieving Contractor of responsibility for omissions or errors, including details, dimensions, materials, etc.;
b. That review of a separate item indicates acceptance of an assembly in which the item functions
PW9408 SECTION D.0500 SUBMITTALS
D-20
1.02 QUALITY ASSURANCE
A. Each submittal shall have a Certificate of Compliance signed by the manufacturer of the material or the manufacturer of the assembled materials and shall state that the materials involved comply in all respects with the requirements of these technical specifications. A Certificate of Compliance shall be furnished with each lot of material delivered to the work and the lot so certified shall be clearly identified in the certificate.
B. Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of the responsibility of incorporating material in the work which conforms to the requirements of the drawings and specifications, and any material not conforming to the requirements will be subject to rejection whether in place or not. The City reserves the right to refuse to permit the use of material on the basis of a Certificate of Compliance.
C. Materials will be inspected at destination to assure compliance with the specified requirements. Any materials that are found to be defective or that do not meet the requirements of the specifications must be replaced.
Rejection of ten (10) percent of any shipment shall be cause of, and will be considered sufficient reason for, rejection of the entire shipment.
D. Submittal Log: Following Notice to Proceed, the Engineer will prepare a list of items (Submittal Log) that the Contractor is required by the Specifications to submit for review.
1. The Submittal Log will designate submittal number, submittal type, description, and format (hardcopy / electronic) for each entry.
2. Within 10 working days after receipt of submittal log from Engineer, provide information in Columns marked "Sub Contr. Name", "Supplier", "Date Sched.”, and "Matl Date"; and return for review.
E. The explanation and instructions for use of the Submittal Log and a sample Submittal Log sheet are included at the end of this Section.
F. As construction schedule is changed and/or updated, submit a marked copy of the Submittal Log showing changes to scheduled dates.
1. The Engineer will input information supplied by the Contractor onto the Submittal Log, tabulate submittal dates on log, update "Action" taken/required as well as show status of submittals, and distribute updated copies of log on a monthly basis.
PW9408 SECTION D.0500 SUBMITTALS
D-21
2. No extension of time will be granted, nor will consideration be given to claims arising out of Contractor's failure to submit shop drawings, product data, samples, or related submittals which do not allow adequate lead time for Engineer's review, and also do not allow ample time for revision, resubmission, and subsequent review by Engineer as required.
G. Performance: Promptly check each submittal for accuracy, completeness, and applicability.
1. Review for compliance, approve, and submit each submittal with reasonable promptness and in sequence that causes no delay in the Work or in the work of the Owner or any separate Contractor.
2. Identify each submittal to include name of Project, Specification Section, supplier, source, finish, and location of use in the Project.
H. Submittal Validity:
1. Submittals which are not required, or which are submitted without Contractor's approval, will not be processed by Engineer but will be returned to Contractor for compliance with Contract Document requirements.
2. In that event, it shall be deemed that Contractor has not complied with requirements of the Contract Documents, and Contractor shall bear responsibility for all delays as if no submittals had been submitted.
1.03 GENERAL SUBMITTAL REQUIREMENTS
A. Scheduling: Where appropriate in various required administrative submittals (listing of products, manufacturers, suppliers, subcontractors, and in job progress schedule), show principal work - related submittal requirements and time schedules for coordination and integration of submittal activity with related work.
B. Coordination and Sequencing:
1. Coordinate preparation and processing of submittals with performance of the work, so that work will not be delayed by submittals. Submittals shall be received by the Engineer at least ten (10) working days in advance of commencing the applicable work. No work may begin on those items prior to final approval of the submittals by the Engineer.
2. Coordinate and sequence different categories of submittals for same work and for interfacing units of work, so that one will not be delayed for
PW9408 SECTION D.0500 SUBMITTALS
D-22
coordination with another.
3. No extension of time will be allowed because of failure to properly coordinate and sequence submittals.
C. Provide submittal material of types indicated in individual Sections of this Project Manual.
1. Provide permanent marking on each submittal to identify Project, date, Contractor, subcontractor, submittal name, and similar information to distinguish it from other submittals.
2. Show Contractor executed review, clearly exhibiting check marks and stamped approved marking acceptance, and provide space for Engineer's review or action marking.
3. Do not allow required shop drawing copies to be used in connection with the Work without appropriate final "Action" markings by Engineer.
D. Provide submittals as follows:
1. Each submittal shall be submitted with the cover sheet issued by the Engineer (sample included at end of this Section).
2. Number all submittals with assigned numbers from submittal log.
3. Sign and date, with Contractor's review stamp on each sheet of submitted material indicating that submittal is in conformance with Contract Documents.
a. On submittals containing numerous small sheets, such as hardware schedules and product data, Contractor shall "review stamp" the submittal cover sheet.
b. Submittals received without Contractor's stamp will be returned "No Action Taken."
4. Provide submittals for equipment in a given system at one time, each complete set under separate cover.
5. When manufacturer's or fabricator's brochures, literature, and data sheets are submitted, identify clearly the system or product specified from other systems or products contained within preprinted information.
a. All options to be included shall be clearly identified.
PW9408 SECTION D.0500 SUBMITTALS
D-23
b. Suppliers' letters will not be considered or acted on instead of manufacturer's printed information and instructions.
6. Indicate types, gauges, style, finishes, etc., of materials on submittals.
a. Include sufficient data to permit a detailed study of product or system submitted.
b. Include manufacturer's installation instructions and test reports where applicable.
7. Mark each submittal to clearly indicate use for which product, material, or procedure is being submitted.
8. Mark each item submitted with the applicable page and paragraph number of the Specification Section and/or the detail and sheet number of the Contract Drawings.
9. Piping, conduit, equipment, etc., submittals shall be accompanied with support/suspension information intended to be used for installation.
10. Efforts will be made to expedite submittals marked as "rush," provided all submittals are not marked "rush."
a. Transmittals/submittals marked "rush" and sent by regular mail will not be given preferential attention.
b. Suppliers' letters will not be considered or acted on instead of manufacturer's printed information and instructions.
1.04 ACTION ON SUBMITTALS
A. Engineer's Action: Engineer will review each submittal, mark with "Action" and return within ten (10) calendar days from date of receipt.
B. Where submittal must be held for coordination with other submittals, Contractor will be so advised without delay.
C. Action markings shall be interpreted as follows:
1. "No Exception Taken": Work may proceed, provided it complies with Contract Documents.
2. "Exceptions Noted": Work may proceed, provided it complies with notations and corrections on submittal and with Contract Documents.
PW9408 SECTION D.0500 SUBMITTALS
D-24
3. "Revise and Resubmit" or "Rejected": Do not proceed with Work.
Revise submittal in accordance with notations thereon, and resubmit without delay to obtain a different action marking.
D. The Engineer will return reviewed submittals electronically via e-mail to a designated address provided and managed by Contractor.
PART 2 MATERIALS
NOT USED
PART 3 EXECUTION
3.01 SUBMITTAL LOG
A. PURPOSE
1. Identify products/materials to be used on the Project and manufacturer/brand and subcontractor responsible for installation of same.
2. Define submittal number, description, type, and quantity of submittals required.
3. Monitor status of submittal as they proceed through the review process.
4. Ensure, insofar as possible, that the Project will not be adversely affected by the submittal review process.
B. ENGINEER'S RESPONSIBILITIES
1. Prepare a submittal log of items which the Contractor is required by specifications to submit for review (see attached sample).
2. Designate submittal number, submittal type, description and quantity, for each entry requiring a submittal.
3. Input information supplied by the Contractor onto the submittal log.
4. Tabulate submittal dates on log, show "Action" taken/required and show status of submittals.
5. Distribute updated copies of log on a monthly basis.
6. Return reviewed submittals electronically via e-mail to a designated address provided and managed by Contractor.
PW9408 SECTION D.0500 SUBMITTALS
D-25
C. CONTRACTOR'S RESPONSIBILITIES
1. Within ten (10) working days after receipt of Submittal Log from Engineer, provide information in Columns marked "SUB CONTR NAME", "SUPPLIER", "DATE SCHED", and "MATL DATE" and return for review. Submit electronically via e-mail.
2. Provide Engineer with red marked copy of log showing any necessary changes to "Scheduled Dates" on a bi-monthly basis. Submit electronically via e-mail.
3. Refer to attached SAMPLE for format.
D. DEFINITION OF COLUMN LABELS AND ABBREVIATIONS USED
1. SUBMITTAL NUMBER: (Information supplied by the Engineer) Based on Specification Section - Number consecutively.
Example: For Section 05400 - The first submittal would be numbered 05400-001. Should this submittal need to be resubmitted, the new submittal would be numbered 05400-001.1, and so on.
2. SEQ NUMBER:
a. This sequentially identifies each submittal by particular item. The first submittal would be numbered 1. Should this submittal need to be resubmitted, the new submittal would be numbered 1.1 and so on.
3. DESCRIPTION: (Information supplied by Engineer)
a. This will identify specifically the material to be submitted. A list of submittal types is included below.
4. SUBCONTR NAME: (Information supplied by the Contractor).
a. If the general Contractor is submitting this for a subcontractor, that firm's name would be entered here.
5. SUPPLIER: (Information supplied by the Contractor).
a. The supplier/manufacturer name should be entered here.
Example: "General Electric".
6. SUB TYPE: (Information supplied by the Engineer)
This indicates the submittal type:
PW9408 SECTION D.0500 SUBMITTALS
D-26
PRDT - Product Data
SHDG - Shop Drawings
SAMP - Samples
INST - Installation Instructions
TSRP - Test Reports
WARR - Warranties
CLDC - Close-out Documents (O&Ms, As-Builts, etc.)
OTHR - Special requirements dictated by certain projects
7. FORMAT: (Information supplied by the Engineer)
Refers to the required format of the submittals: electronic, hard copy or both
8. DATE SCHED: (Information supplied by the Contractor).
a. Prior to sending any submittals, the Contractor will supply an anticipated date the submittal will be sent. This is used by the Engineer to schedule work load in order to return submittals in a timely manner.
9. DATE REC (Information supplied by Engineer)
a. This refers to the date the submittal was received by the Engineer.
10. DATE TO CONTR (Information supplied by Engineer)
a. This refers to the date that the Engineer returned the submittal to the Contractor.
11. MATL DATE: (Information supplied by the Contractor).
a. This refers to the date that the material/equipment is scheduled to be delivered to the Job Site.
12. ACTION (Information supplied by Engineer)
a. This reflects the review stamp that is marked by the Engineer showing what action has been taken with the submittal:
NET - No Exceptions Taken
SSI – Submit Specified Item
MCN – Make Corrections Noted
R&R - Revise & Resubmit
REJ - Rejected
13. STATUS (Information supplied by Engineer or Contractor)
PW9408 SECTION D.0500 SUBMITTALS
D-27
This refers to the current status of the submittal as of the date printed.
NR NOT RECEIVED: Submittal has not be received from the Contractor.
PEND PENDING: Has been received and is under review.
COMP COMPLETE: Has been received, marked either No
Exception Taken or Exceptions Noted and therefore does
not require further submittal.
R&R REVISE AND RESUBMIT: Has been received,
reviewed, and marked either Revise & Return or Rejected, therefore requiring a resubmittal.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for conforming to the requirements of above provisions shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
SECTION D.0500 SUBMITTALS
D-28
PART 5 SAMPLE SUBMITTAL LOG
SUBMITTAL NUMBERS E Q #DESCRIPTION SUBCONTR NAME SUPPLIER SUB TYPE
F O R M A TD A T E S C H E D D A T E R E CD A T E T O C O N T RM A T L D A T E A C T I O NS T A T U S PW9738 SECTION D.0500 SUBMITTALS
D-29
CITY OF VALLEJO SUBMITTAL COVER SHEET
DATE SUBMITTED: DATE RECEIVED BY CITY:
CAPITOL STREET REHABILATITION PROJECT
PROJECT NUMBER: PW9738 SUBMITTAL NUMBER:
DESCRIPTION:
MANUFACTURER:
SUPPLIER:
CONTRACTOR:
SUBCONTRACTOR:
Contractor Review Stamp Engineer Review Stamp
Remarks:
Contractor:
SIGNATURE PRINTED NAME
#
PW9408 SECTION D.0600 EXISTING UTILITIES
D-30
SECTION D.0600 - EXISTING UTILITIES
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall consist of coordinating with the utility agencies for relocation or adjustment of utilities.
1.02 CALIFORNIA ADMINISTRATIVE CODE
A. Section 1540(a) 1 of Construction Safety Orders (Title 8) California Administrative Code, section 1540 states:
1. “Prior to opening and excavation, effort shall be made to determine whether underground installations; i.e., sewer, water, gas, electric lines, storm drain, cable TV, telephone, and fiber optics, will be encountered and, if so, where such underground installations are located. When the excavation approaches the approximate location of such an installation, the exact location shall be determined by carefully probing or hand digging; and, when it is uncovered, adequate protection shall be provided for the existing installation. All known owners of underground facilities in the area concerned shall be advised of proposed work at least 48 hours prior to the start of actual excavation.”
1.03 PUBLIC UTILITIES AFFECTED:
A. The list includes, but is not limited to the following:
1. Electrical: Pacific Gas & Electric
2. Gas: Pacific Gas & Electric
3. Water Service: City of Vallejo has jurisdiction over water systems.
4. Drainage & Sanitary Sewer: The Vallejo Sanitation and Flood Control District (VFWD) has jurisdiction over drainage and sanitary sewers in the area.
5. Roads: The City of Vallejo has jurisdiction over roads in the area.
6. Cable Television: Comcast Communications, Inc. It should be noted that where overhead service to a structure that has service does not exist then underground service shall be assumed to exist.
7. Telephone: AT&T - It should be noted that where overhead service to a structure, known to receive service, does not have overhead service, then underground service shall be assumed to exist.
PW9408 SECTION D.0600 EXISTING UTILITIES
D-31
B. For assistance with location of underground telephone facilities, call Underground Service Alert (USA) of Northern California at (800) 227-2600.
PART 2 MATERIALS
2.01 CONCRETE SLURRY
A. Concrete slurry backfill shall be a 2-sack pea-gravel mix that attains 3,000 psi in 7 days.
2.02 CONSTRUCTION SAND
A. Clean, washed, construction sand shall be utilized as initial backfill a minimum of 2 inches around the exposed utility prior to backfill with concrete slurry.
PART 3 EXECUTION
3.01 EXISTING UTILITIES
A. The work performed in connection with various existing utilities shall conform to the provisions in Section 5-1.36, “Property and Facility Preservation,” Section 7-1.05, “Indemnification,” Section 7-1.06, “Insurance,” of the Standard Specifications and these technical specifications.
3.02 CONTRACTOR RESPONSIBILITY
A. The Contractor shall be cognizant of the existing utility lines in the proximity of the work area and take precautions, as necessary, to not disturb these facilities.
B. It is not the intent of the drawings to show the exact location of existing or relocated utilities, and the Engineer assumes no responsibility therefor.
Whenever such utilities are indicated thereon, the Contractor shall be responsible for verifying their actual location and depth in the field. The Contractor shall notify Underground Service Alert (USA) at (800) 227-2600 prior to excavation.
C. It is the Contractor’s responsibility to coordinate with the utility agencies for relocation or adjustment of utilities.
D. It shall be the Contractor’s responsibility to mark excavation areas and to notify the Underground Service Alert (USA) at 811 at least five (5) working days prior to beginning excavation in any area. Also, cable TV shall be contacted three (3) working days prior to excavation.
PW9408 SECTION D.0600 EXISTING UTILITIES
D-32
The Contractor shall pothole for potential utility conflicts where directed by the Engineer prior to commencing roadway asphalt removal or demolition of facilities. The potholing shall be done sufficiently ahead of the installation or construction of facilities so that the Engineer has at least five (5) working days to address any conflicts.
E. The Contractor shall be responsible to coordinate with the various utility agencies to become familiarized with all known underground utility obstructions, but this will not relieve the Contractor from full responsibility in anticipating and locating their actual existence. No extra payment will be allowed for the removal, replacement, repair, or possible increased cost caused by inadvertent or planned interception and breaking of underground obstructions which may exist.
F. The Contractor, in conjunction with the affected utility company(s), shall locate and establish the horizontal and vertical location of all utilities shown on the Drawings and/or marked in the field. This may be done on an area- by-area basis, but shall be accomplished at least 5 working days in advance of the date of construction within such area and prior to any fabrication. Any discrepancies (horizontal and/or vertical) between the locations of a utility found by the potholing operation than that shown on the Drawings shall be brought to the Engineer's attention immediately.
G. Overhead utility poles within ten feet (10’) of trenching shall be adequately braced until trench is backfilled as directed by utility company representative. Overhead lines shall not be damaged. If damaged, the Contractor shall repair overhead lines, and such repair shall be considered work under this Contract and not extra work.
H. Unless otherwise specified, the Contractor shall remove all interfering portions of abandoned utilities and shall properly seal the remaining work.
I. Backfill of Potholes – Contractor shall be prepared with construction grade sand to place over found utilities as directed by Engineer, in addition to 2- sack concrete slurry in adequate amounts to reach pavement grade.
J. If the Contractor learns of the existence or location of any underground utility main or trunk line omitted from or shown incorrectly on the Drawings or not properly marked, the Contractor shall immediately notify the Engineer. The main or trunk line shall be located and protected from damage as directed by the Engineer, and the cost of that work will be paid for as extra work as provided in Section 4-1.05 of the Standard Specifications. The Contractor shall, if directed by the Engineer, repair any damage that may occur to the main or trunk lines. The cost of that repair work not due to the failure of the Contractor to exercise reasonable care, will be paid for as extra work as provided in Section 4-1.05 of the Standard Specifications. Damage due to the Contractor’s failure to exercise PW9408 SECTION D.0600 EXISTING UTILITIES
D-33
reasonable care shall be repaired at the Contractor’s cost and expense.
Record the utility depths for each location and provide this information to the City. Use careful means to locate underground utilities to avoid damage via use of hand tools, hand work, equipment, and as necessary to protect and locate the concealed utilities; backfill with construction sand and concrete slurry to existing grade.
K. When it is determined by the Engineer that the rearrangement of an underground facility is essential in order to accommodate the improvements and the drawings and specifications do not provide that the facility is to be rearranged, the Engineer shall provide for the rearrangement of the facility by other forces or the rearrangement shall be performed by the Contractor and will be paid for as extra work as provided in Section 1.05 of the Standard Specifications.
L. Should the Contractor desire to have any rearrangement made in any utility facility, or other improvement, for the Contractor’s convenience or in order to facilitate the Contractor’s construction operations, where rearrangement is in addition to, or different from, the rearrangements indicated on the drawings or in the technical specifications, the Contractor shall make whatever arrangements are necessary with the owners of the utility or other non-highway facility for the rearrangement and bear all expenses in connection therewith.
M. The Contractor shall immediately notify the Engineer of any delays to the Contractor’s operations as a direct result of underground main or trunk line facilities which were not indicated on the drawings or in the technical specifications, or as a direct result of utility or other non-highway facilities not being rearranged as provided herein (other than delays in connection with rearrangements made to facilitate the Contractor’s construction operations or delays due to a strike or labor dispute). Delays resulting from mainline utility relocation shall be considered unavoidable and will not be included in the required completion time provided the Contractor diligently pursues correction of the situation. Adequate written evidence of diligent pursuit shall be provided upon demand by the Engineer whose determination of diligent pursuit shall be final. These delays shall be considered within the meaning of Section 8-1.07, “Delays,” of the Standard Specifications, and compensation for the delay will be determined in conformance with the provisions in Section 8 of the Standard Specifications.
The Contractor shall be entitled to no other compensation for that delay.
N. Any delays to the Contractor’s operations as a direct result of utility or other non-highway facilities not being arranged due to a strike or labor dispute shall entitle the Contractor to an extension of time as provided in Section 8-
1.07B, “Time Adjustments” of the Standard Specifications. The Contractor shall be entitled to no other compensation for that delay.
PW9408 SECTION D.0600 EXISTING UTILITIES
D-34
O. Laterals and service lines encountered, whether shown or not shown on the drawings, shall be handled as required by the governing utility and any effect on the project due to their presence shall not constitute a claim for additional compensation.
P. Pothole and verify location of existing water lines under the supervision of the City Water Maintenance. Call forty-eight (48) hours before start of work close to water main. Pothole and verify location of existing utilities under the supervision of utility representatives, as appropriate.
Q. All existing utilities and improvements that become damaged during construction shall be completely restored to the satisfaction of the local agency engineer, at the Contractor's sole expense prior to acceptance of job. Any damage to the City water lines shall be repaired to meet City of Vallejo specifications and Utility Director’s approval.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for all other work to conform to the requirements of this section, including underground utility locating, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-35
SECTION D.0700 - TRAFFIC AND ACCESS CONTROL
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall include furnishing all labor, materials, equipment, tools, and incidentals and performing all operations in connection with the installation of temporary advance warning and construction signs, flagging, traffic- handling equipment, devices and other related items to provide for safety and convenience to the public and traffic during all phases of construction.
B. This work shall also include taking necessary means to provide (at a minimum) access at driveway entrances by the end of each work day and access to crosswalks at intersections not under construction and providing access to one crosswalk northbound/southbound and one crosswalk eastbound/westbound at four-way intersections under construction with the use of flaggers.
C. The Contractor shall be responsible for providing adequate safeguards, safety devices, protective equipment, and any other needed actions to protect the life, health, and safety of the public, and to protect property in connection with the performance of the work covered by the contract. The Contractor shall perform any measures or actions the City or the Engineer may deem necessary to protect the public and property.
D. Attention is directed to Sections 7-1.03, “Public Convenience”, Section 7-
1.04, “Public Safety”, and Section 12, “Temporary Traffic Control”, of the Standard Specifications.
PART 2 MATERIALS
A. All traffic control devices, including furnishment and installation, shall conform to the latest provisions of the California Manual on Uniform Traffic Control Devices (California MUTCD) and Section 12, “Temporary Traffic Control”, of the Standard Specifications and these technical specifications.
PART 3 EXECUTION
3.01 SCHEDULE OF OPERATIONS AND TRAFFIC CONTROL PLAN
A. The Contractor must submit a detailed schedule of operations and a traffic control plan to the City by the date of the pre-construction meeting for review and comment. No work will begin until the traffic control plan has been approved.
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-36
3.02 MAINTAINING TRAFFIC
A. The Contractor shall schedule, stage, and conduct all construction operations with regard to public convenience and in a manner to provide for the safe and expeditious movement of traffic. The Contractor shall have under construction no greater length or amount of work than can be completed within a workday with due regard to the rights of the public.
B. To minimize the disruption to public traffic, the Contractor shall:
1. Permit local traffic to pass through the work area with the least possible inconvenience or delay.
2. Repair or remove any condition resulting from the work that might impede traffic or create a hazard.
3. Keep existing roadway lighting systems in operation throughout the construction work.
4. The full width of the traveled way shall be open for use by public traffic on designated legal holidays and when construction operations are not actively in progress.
3.03 TRAFFIC CONTROL PLAN REQUIREMENTS
A. It is recommended that Traffic Control Plans be prepared by a California licensed traffic engineer or professional engineer with specialty in traffic engineering or by a company specializing in the preparation of traffic control plans.
B. The Contractor shall immediately advise the Engineer of any proposed change in the Traffic Control Plan and shall obtain approval of the Engineer prior to implementing any change. A revised plan shall be provided to the Engineer within ten (10) working days of the adoption of the change.
C. All Traffic Control Plans (TCPs) shall:
a. be submitted on 11”x17” or 24”x36” paper;
b. be computer generated in black and white and clearly visible when reproduced (“Google” aerials, 3D symbols, and photocopies direct from the California MUTCD or other traffic control handbooks will not be accepted) or hand drawn in black and white (hand drawn TCPs shall use a straight edge for line work and shall be legible); c. use a scale no larger than 1”=80’ (TCPs requiring more than one sheet shall use match lines);
d. show north arrow in correct alignment;
e. include Contractor’s name, address, telephone number, and telephone number of the 24-hour contact person representing the Contractor;
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-37
f. note the type of work that the submitted TCP will be used for and the duration of work;
g. note the posted speed limit;
h. use California MUTCD sign code designations;
i. use the symbols shown on Table 6H-2 of the California MUTCD 2012 Edition to identify cones/delineators, barricades, signs, flaggers, etc. (note, all symbols to be in black and white);
j. be site specific (show existing lane geometry, medians, driveways, sidewalks, bus stops, etc.);
k. show all streets in the work zone vicinity to ensure proper orientation; l. show all parking restriction zones and signs, as appropriate; m. show all existing traffic signals and traffic control signs; n. show staging area and materials storage area, as appropriate; o. show signs and barricades that will be required to direct pedestrians through or around the construction work zone;
p. provide a line map showing complete detour route and signage for all half road or full road closures;
q. label all taper lengths and widths, delineator spacing and sign spacing (all dimensions to be shown on the plan and not in table form). r. include a pedestrian detour plan to route pedestrian traffic around the work area with signage to direct pedestrians to cross at adjacent intersections/crosswalks and indicate the portions of the sidewalk that will be closed to pedestrian traffic
D. Additional requirements could be needed dependent upon each situation.
E. The following General Notes shall be added to the Traffic Control Plan:
1. The City, through its designated employees, reserves the right to initiate field changes to assure public safety.
2. Road closures will require minimum (5) working day notice and shall be approved by the Department of Public Works Traffic Engineering Division prior to closure.
3. All traffic control devices shall be removed from public right-of-way when not in use.
4. Work hours shall be restricted to between 8:00 a.m. to 4:00 p.m. unless approved otherwise.
5. Trenches shall be backfilled or plated during non-working hours.
6. All sidewalks and pedestrian pathways shall be clear of debris and ADA accessible after work hours unless pedestrian detours are approved.
7. Pedestrian controls shall be provided as shown on the drawings.
8. Temporary "NO PARKING" signs shall be posted 72 hours prior to commencing work.
9. Access to driveways will be maintained at all times unless other arrangements are made.
10. The Contractor shall make immediate temporary repairs to any street
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-38
light/traffic signal conduit damaged during construction. Permanent repairs shall be made within five (5) working days.
11. All striping removed or damaged, will be replaced by the Contractor with like material within 24 hours (or replaced with temporary tape, though the Contractor is still responsible for the full replacement as noted above).
12. All flaggers shall be equipped with a hard hat, two-way radios, and "Stop/Slow" paddle. In addition, all flaggers shall be trained in the proper fundamentals of flagging traffic.
13. Any work that disturbs normal traffic signal operations shall be coordinated with the City of Vallejo's Traffic Supervisor, 72 hours prior to beginning construction (if work will be done on a Monday, notice shall be given by the end of business day the Thursday before) at (707) 648-4518.
14. The Contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
15. A minimum of twelve (12) foot travel lanes shall be maintained, (14) foot travel lanes when Class II bike lanes are closed or when closing a lane on a signed Bike Route.
3.04 TRAFFIC CONTROL DEVICES
A. If any component in the traffic control system is displaced, or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.
B. When lane closures are set for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, shall be removed from the traveled way and shoulder.
C. The Contractor shall check the location of traffic control devices at the beginning of each workday and periodically throughout the workday to ensure that the devices are properly placed and maintained.
3.05 PARKING RESTRICTIONS
A. Posted notification a minimum of 72 hours in advance of restricted parking is required for all areas authorized for no parking. To legally tow vehicles parked in posted construction zones, the 72 hour advance notification is required.
B. The duration of parking restrictions shall be as approved by the Engineer.
C. Personal vehicles of the Contractor’s employees shall not be parked on the paved shoulders or the traveled way, including any section closed to public traffic.
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-39
3.06 FLAGGING
A. The Contractor must provide all flag persons necessary for the direction of public traffic either through or around the work, including but not limited to providing a flag person at all times during the unloading of concrete or asphalt trucks.
B. Flaggers shall not be used during the hours of darkness unless authorized by the City.
3.07 OPEN EXCAVATIONS
A. Barricades with functional flashing beacons and caution tape shall be placed at each excavation site and left until the Engineer deems there is no longer a hazard.
B. Contractor shall provide access across excavated driveway entrances by the end of each work day, including furnishing and installing temporary asphalt transitions.
C. Contractor shall provide steel plates or wooden boards to cover any open excavation in the sidewalk or curb ramp area where access is required.
Wooden boards shall have sufficient strength to support a 400lb. live load.
3.08 LANE CLOSURE AND DETOUR TRAFFIC CONTROL SYSTEMS
A. Contractor shall be responsible for all aspects of lane closures or detouring traffic around the construction zones during cold planing, paving, concrete pouring and any operation that will continuously obstruct or stop traffic within a work day, including placement of 72 hour advance warning signs with date of detour noted.
B. Detour plans shall be submitted for City review and approval prior to initiation of construction activities that require a detour.
C. Lane closures shall not be permitted on Saturday, Sunday, or legal holidays except by the express written permission of the Engineer.
D. Maintain a minimum of one two-way travel lane with flaggers or a minimum of two travel lanes without flaggers. Travel lanes shall be 11 feet wide minimum.
3.09 NOTIFICATIONS
A. The Contractor shall notify local authorities of the need for lane closure(s) and/or construction delays and cooperate with local authorities relative to handling traffic through the area and make his own arrangements relative to keeping the working area clear of parked vehicles. After the first working day, the Contractor shall keep the Engineer and local authorities updated
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-40
on a daily basis. Local authorities to notify include:
1. City Engineer (707-648-4315)
2. City of Vallejo Police Department (707-648-4321)
3. U.S. Postal Service (707-558-1834)
4. City of Vallejo Fire Department (707-648-4526)
5. Waste Disposal Service (Recology Vallejo) (707-552-3110)
6. Ambulance Service(s)
B. Detour plans shall be submitted for City review and approval prior to initiation of construction activities that require a detour.
C. Lane closures shall not be permitted on Saturday, Sunday, or legal holidays except by the express written permission of the Engineer.
D. Work shall be accomplished in such a manner as to provide access to all intersecting streets and adjacent properties whenever possible. If access to any property cannot be provided, then adequate nearby parking shall be provided and maintained until direct access can again be restored. If during the course of the work, it is necessary to restrict access to driveways, the Contractor shall notify the affected residents in writing, at least seventy-two (72) hours in advance and close driveways only by prior scheduled arrangement with the owners/tenants. Prior to the closure of driveways, the Contractor shall coordinate with and notify the property owner or resident at least twice for such closure.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor. The work includes full compensation for furnishing all labor (including preparation of the Traffic Control Plan and flaggers when necessary), materials (including flashing arrow signs, barricades, door hangers and temporary traffic delineation), tools, equipment, and incidentals and for doing all the work involved in traffic control, complete in place, including all work necessary to provide for the convenience & safety of the public, temporary pedestrian passage (ramps, walkways, etc.), steel plates, wood covers, and to facilitate the performance of the contract work as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
B. The adjustment provisions in Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, shall not apply to the item of traffic control system. Adjustments in compensation for traffic control system will be made only for increased or decreased traffic control system required by
PW9408 SECTION D.0700 TRAFFIC AND ACCESS CONTROL
D-41
changes ordered by the Engineer and will be made on the basis of the cost of the increased or decreased traffic control necessary.
C. Full compensation for furnishing labor, materials, tools and equipment for installing means of vehicular access across open asphalt excavations at driveway entrances by end of work day, including temporary asphalt transitions shall be considered as included in the lump sum price for, and no separate payment will be made therefor.
END OF SECTION
PW9408 SECTION D.0800 CONSTRUCTION AREA SIGNS
D-42
SECTION D.0800 - CONSTRUCTION AREA SIGNS
PART 1 GENERAL
1.01 SCOPE OF WORK
E. This work shall consist of furnishing, installing, maintaining, and removing Construction Area Signs in conformance with the provisions in the latest version of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the project drawings.
F. Nothing in these technical specifications shall be construed as relieving the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section 7-1.04, "Public Safety," of the Standard Specifications.
PART 2 MATERIALS
A. Sign substrates for stationary-mounted construction area signs may be fabricated from fiberglass reinforced plastic as specified under “Prequalified and Tested Signing and Delineation Materials” of these technical specifications.
PART 3 EXECUTION
3.01 GENERAL
A. The Contractor may be required to cover certain signs during the progress of the work. Signs that are no longer required or that convey inaccurate information to the public shall be immediately covered or removed or the information shall be corrected. Covers for construction area signs shall be of sufficient size and density to completely block out the complete face of the signs. The retroreflective face of the covered signs shall not be visible either during the day or at night. Covers shall be fastened securely so that the signs remain covered during inclement weather. Covers shall be replaced when they no longer cover the signs properly.
B. If any component in the construction area sign system is displaced, or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.
C. The Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least 2 working days, but not more than 14 calendar days, prior to commencing excavation for construction area sign posts. The regional notification centers include, but are not limited to, the following:
PW9408 SECTION D.0800 CONSTRUCTION AREA SIGNS
D-43
D. Excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes. The post hole diameter, if backfilled with minor concrete, shall be at least 4 inches greater than the longer dimension of the post cross section.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. The contract lump sum price paid for within “Temporary Traffic Control” shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals required for doing all work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the Construction Area Signs or any other equipment used to protect the public or designate construction areas, excavation, and backfill , as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
END OF SECTION
Notification Center Telephone
Number
Underground Service Alert-Northern
California (USA) 811
PW9408 SECTION D.0900 WASTE MANAGEMENT PLAN
D-44
SECTION D.0900 - RECYCLING & WASTE MANAGEMENT PLAN
(WMP)
PART 1 GENERAL
1.01 WASTE MANAGEMENT PLAN (WMP)
A. The City of Vallejo is making an effort to recycle or to salvage the materials for this project. A Waste Management Plan (WMP) is required for this project. Many of the demolition materials of this project, such as asphalt concrete and Portland cement concrete can be recycled or reused.
B. The Contractor is required to list in the WMP the materials that will be recycled, reused or disposed, resulting from the project. The Contractor is required to recycle or reuse a minimum of 95% of demolition debris generated by this project. Hazardous materials shall be discounted in the calculation of recycle or reuse requirement.
C. The Contractor shall be responsible for all aspects of recycling all concrete and asphalt removed as a result of doing the required work. For this section recycling shall mean reuse of material in another manufactured product or reuse as some form of building or paving material. Reuse by an established recycling firm is an acceptable method of recycling, subject to approval by the Engineer. Use as daily cover material in a landfill is also an acceptable method of recycling.
D. The Waste Management Plan (WMP) shall indicate:
1. The total weight of project debris, by materials type, generated.
2. The maximum volume or weight of such materials that can feasibly be diverted via reuse or recycling.
3. The vendor or facility that the Contractor proposes to use to collect or receive that material.
4. The weight of demolition materials that will be land filled.
5. Project square footage.
E. If the Contractor shall experience unique circumstances that the Contractor believes make it infeasible to comply with the City’s diversion requirement, the Contractor may apply for an exemption at the time that he or she submits the WMP.
PW9408 SECTION D.0900 WASTE MANAGEMENT PLAN
D-45
PART 2 MATERIALS
NOT APPLICABLE
PART 3 EXECUTION
3.01 WASTE MANAGEMENT
A. The Contractor shall be responsible for locating a suitable disposal site approved by the Engineer for disposing of all non-recyclable material.
When non-recyclable material is to be disposed of at a location other than at the nearest proper landfill site, the Contractor shall obtain written authorization from the property owner on whose property the disposal is to be made and he shall file with the Engineer said authorization together with a written release from the property owner absolving the City from any and all responsibility in connection with the disposal of material on said property.
If the dumpsite is within the City limits, the property owner must obtain a grading permit when applicable.
B. The Contractor shall be responsible for locating a recycling firm and/or recycling site for approval by the Engineer for reuse of all concrete and asphalt rubble. The Contractor shall provide the City with weight certificates or other approved form of quantity certification for all material recycled.
C. The Contractor shall be responsible for all aspects of recycling all asphalt and concrete removed as a result of doing the required work. Recycling shall mean reuse of material in another manufactured product or reuse as some form of building or paving material. Reuse by an established recycling firm is an acceptable method of recycling, subject to approval by the Engineer. Use as daily cover material in a landfill is also an acceptable method of recycling.
3.02 WASTE MANAGEMENT PLAN (WMP)
A. To fulfill the requirement of the WMP, the Contractor is required to separate the demolition debris. By sorting on-site into distinct containers or stockpile for each type of material proposed to be reused or recycled, as well as separate container for refuse.
B. After segregation and prior to transport, Engineer shall inspect containers or stockpile for each type of material to be reused or recycled.
C. Contractor shall fill out and submit Waste Management Plan sheet and table to Engineer upon completion of transport of demolition materials to recycling facility. Contractor shall ensure that facilities provide them with recycling and / or disposal receipts to compile and submit to City as supporting documentation for WMP.
PW9408 SECTION D.0900 WASTE MANAGEMENT PLAN
D-46
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions, including preparing and adhering to a Waste Management Plan (WMP) securing a dump site, securing a method of recycling concrete and asphalt, sorting, separating, hauling, removing, and disposing of or stockpiling materials, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
B. Documentation, including receipts showing actual weights of all material recycled, salvaged and disposed must be submitted on a regular basis before issuance of payments for all concrete removal and concrete construction items of work.
END OF SECTION
PW9408 SECTION D.0900 WASTE MANAGEMENT PLAN
D-47
CITY OF VALLEJO
WASTE MANAGEMENT PLAN
The required goal is to reuse or recycle at least RECYCLING GOAL-95% of project waste.
Use tons or cubic yards to quantify total estimated waste and percentages for materials.
Ask your hauler, recycler or site cleanup vendor to assist you with this plan. Receipts of all recycling and disposal must be submitted after project completion.
Project Name: Vallejo City-Fleet Electric Vehicle Charging Stations Project PW9408 Location: Corporation Yard located at 111 Amador Street, Vallejo, CA 94590 The Fleming Hill Water Treatment Plant located at 202 Fleming Hill Road, Vallejo, CA 94589
Type of Project:
□ New Construction
□ Demolition (Portland Cement Concrete and Asphaltic Concrete Removal) □ Renovation
Type of Construction: (concrete, steel, etc.)
Value of Project:
Bidder:
Company Name:
Address:
Phone / FAX:
Questions regarding recycling: Call Derek Crutchfield, Recycling Coordinator at (707) 648-5346.
Submit this form and the attached Waste Management plan to the Engineer prior to invoice.
Sheet 1 of 2
PW9408 SECTION D.0900 WASTE MANAGEMENT PLAN
D-48
CITY OF VALLEJO
WASTE MANAGEMENT PLAN FOR
Project Name: Vallejo City-Fleet Electric Vehicle Charging Stations Project PW9408 Materials Total
Percentage
of Materials
Percentage
Reused/
Recycled
Materials
Percentage
Disposed
Materials
Collection
Hauler/
Facility
Actual
Waste
Amount/
Comments
(attach
receipts)
Asphalt/
Concrete
Dirt
Brick/
Masonry
Wood
Metals
Other
(painted
wood,
drywall)
TOTAL
This column
should total
100%
This column
should total
at least:
RECYCLING
95%
If the Contractor was unable to recycle Pavement Rehabilitation Project, please provide an explanation:
Other comments:
I CERTIFY THAT THE ABOVE INFORMATION IS TRUE & CORRECT TO THE BEST OF MY KNOWLEDGE.
Prepared by: Date:
Signature:
Sheet 2 of 2
PW9408 SECTION D.1000 WATER POLLUTION CONTROL
D-49
SECTION D.1000 - WATER POLLUTION CONTROL
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Water pollution control work shall conform to the provisions in Section 13, “Water Pollution Control,” of the Standard Specifications and these technical specifications, except that Section 13-3, “Stormwater Pollution Prevention Plan”, of the Standard Specifications shall not apply.
B. Under no circumstances shall water contaminated with sediment or other pollutants be allowed to enter the storm drain system or other drainage courses. Contractor shall clean up all surfaces contaminated by construction operations that could pollute stormwater runoff.
C. The Contractor is required to prepare a Water Pollution Control Plan (WPCP) and implement the plan once approved by the Engineer.
D. Conformance with the provisions in this section shall not relieve the Contractor from the Contractor’s responsibilities as provided in Section 7, “Legal Relations and Responsibility to the Public”, of the Standard Specifications.
PART 2 MATERIALS
A. All materials used for Best Management Practices (BMPs) shall be featured in the WPCP and shall be acceptable methods of storm water management and pollution control.
B. Water pollution control work shall conform to the requirements in the “Construction Site Best Management Practices (BMPs) Manual”, dated March 2003 issued by the State of California Department of Transportation and addenda thereto issued up to and including the date of advertisement of the project, hereafter referred to as the “Handbook”. As an alternative, the Contractor can utilize the California Stormwater Quality Association (CASQA) BMP fact sheets instead of the Handbook fact sheets.
PART 3 EXECUTION
A. The WPCP shall be designed to address the following objectives:
1. All pollutants and their sources, including sources of sediment associated with construction, construction site erosion and all other activities associated with construction activity are controlled;
PW9408 SECTION D.1000 WATER POLLUTION CONTROL
D-50
2. All non-storm water discharges and pollutants are identified and either eliminated, controlled, or treated;
3. Site BMPs are effective and result in the reduction or elimination of pollutants in storm water discharges and authorized non-storm water discharges from construction activity to the appropriate standard required by the Handbook.
B. The WPCP shall include information that supports the selections, use, and maintenance of BMPs.
C. The WPCP shall be available at the construction site during working hours while construction is occurring and shall be made available upon request by a State or Municipal Inspector.
D. In addition, the Contractor shall observe the following guidelines:
a. No concrete work or asphalt concrete paving while it is raining. b. Store materials as required under 13-4.03C, “Material Management” of the Standard Specifications.
c. Cover inlets and manholes when paving, grinding, or sawcutting in conformance with the provisions in Section 13-4.03E(7), “Paving, Sealing, Sawcutting, Grooving, and Grinding Activities”, of the Standard Specifications.
d. Place drip pans or absorbent materials under equipment when not in use.
e. During wet weather store equipment indoors or cover with tarp or other waterproof covering.
f. Sweep site daily to prevent sand, gravel, or excess asphalt from entering or being transported by rain into the storm drain system. g. Keep ample water pollution materials on-site, including drip pans, absorbent materials, waterproof covering materials, filter fabric, gravel bags, etc. Unused materials should be stored in such a manner that they are kept free of debris and sediment and out of the rain.
h. Soil stabilization practices and sediment control measures shall be provided at all times.
E. Do not wash out concrete trucks into storm drains, open ditches, streets, streams, or unprotected unpaved areas. The Contractor shall prevent the discharge of pollutants from concrete operations by using measures to prevent run-on and run-off pollution, properly disposing of wastes, and by implementing the following BMPs:
a. Store all materials in waterproof containers or under cover away from drain inlets or drainage areas.
b. Avoid mixing excess amounts of portland cement materials. Dispose of any excess materials properly.
PW9408 SECTION D.1000 WATER POLLUTION CONTROL
D-51
2. Whenever possible, perform washout of concrete trucks off-site where discharge is controlled and not permitted to discharge to the storm drain system.
3. For on-site washout, adhere to the following requirements:
a. Locate washout area at least fifty (50) feet from storm drains, open ditches, or other water bodies.
b. Confine run-off from the washout area by constructing a temporary pit or bermed area large enough for the liquid and solid waste, covered completely with two layers of waterproof material. c. After the concrete sets, dispose of the remaining debris, water, and other waste properly.
d. Do not washout onto dirt area. Soil contaminated with concrete debris or concrete waste water must be excavated completely and disposed of offsite at the Contractor’s expense.
e. Washout recycled aggregate base only within on-site washout area.
F. The Contractor shall know and full comply with the applicable provisions of the Handbook and Federal, State, and local regulations that govern the Contractor’s operations and storm water discharges from both the project site and areas of disturbance outside the project limits during construction.
G. Unless arrangements for disturbance of areas outside the project limits are made by the City and part of the contract, it is expressly agreed that the City assumes no responsibility whatsoever to the Contractor or property owner to allow disturbance of areas outside the project limits.
H. The Contractor shall be responsible for the costs and for liabilities imposed by law as a result of the Contractor’s failure to comply with the requirements set forth in this section, including, but not limited to, compliance with the applicable provisions of the Handbook and Federal, State, and local regulations. Costs and liabilities include, but are limited to, fines, penalties, and damages whether assessed against the State or the Contractor, including those levied under the Federal Clean Water Act and the State Porter-Cologne Water Quality Act.
I. The Engineer may order the suspension of construction operations which create water pollution if the Contractor fails to conform to the provisions in this section.
J. TEMPORARY STORM DRAIN INLET PROTECTION
a. Temporary storm drain inlet protection shall be constructed, installed, maintained, and removed at all drainage inlets within the boundaries of the project. The Contractor shall select the appropriate drainage inlet protection to meet the conditions around the drainage PW9408 SECTION D.1000 WATER POLLUTION CONTROL
D-52
inlet. Throughout the duration of the contract, the Contractor shall provide protection to meet the changing conditions around the drainage inlet.
b. Temporary Drainage Inlet Filters: The Contractor shall furnish, install, maintain and remove drainage inlet filters suitable for installation on existing storm drain inlets for removal of sedimentation and debris from water flow into the drainage inlets within the boundaries of the project and as directed by the Engineer.
Temporary Drainage Inlet Filters shall be installed at all storm drain inlets within or adjacent to the project limits. Temporary drainage inlet filter shall be obtained from a commercial manufacturer, as approved by the Engineer.
c. Sediment Filter Bags: Sediment filter bags shall be installed by removing the drainage inlet grate, placing the sediment bag in the opening, and replacing the grate to secure the sediment filter bag in place.
d. Removal: When the temporary drainage inlet protection is no longer required the protection materials shall be removed and disposed of in accordance with the provisions in Section 14-10, "Solid Waste Disposal and Recycling," of the State Standard Specifications. e. Maintenance: Temporary drainage inlet protection shall be maintained to provide sediment holding capacity and to reduce runoff velocities. Temporary drainage inlet protection shall be repaired or replaced immediately if damage occurs.
f. Sediment deposits, trash, and debris shall be removed from temporary drainage inlet protection as needed or when directed by the Engineer. Removed sediment shall be deposited within the project limits so that the sediment is not subject to erosion by wind or by water. Trash and debris shall be removed and disposed of in accordance with the provisions in Section 14-10, "Solid Waste Disposal and Recycling," of the State Standard Specifications. All Sediment Filter Bags shall be removed at the conclusion of the project.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for complying with the requirements of the above provisions, full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all the work involved in developing, preparing, obtaining approval of, revising, amending, and implementing the
PW9408 SECTION D.1000 WATER POLLUTION CONTROL
D-53
water pollution control plan and maintaining best management practices (BMP’s), and for doing all the work involved in installing, constructing, maintaining, removing, and disposing of water pollution control practices, including non-storm water and waste management and materials pollution water pollution control practices, except those shown on the drawings and for which there is a contract item of work, as specified in drawings, the Standard Specifications, and the technical specifications, and as directed by the Engineer, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END SECTION
PW9408 SECTION D.1050 CLEARING AND GRUBBING
D-54
SECTION D.1050 - CLEARING AND GRUBBING
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Clearing and grubbing consists of removal and disposal of all objectionable material from the work area, including existing weeds, brush, shrubs, concrete, masonry, other unsuitable material, and obstructions interfering with the new construction. The limits of clearing and grubbing shall be of sufficient area and depth to complete the work as shown on the drawings.
Clearing and grubbing shall conform to Section 17-2, “Clearing and Grubbing”, of the Standard Specifications.
B. Clearing and grubbing must be performed in advance of any other grading or construction operations. The area to be cleared and grubbed must be within the work area.
C. Shrubs and hedges shall be designated for removal in the project drawings or as directed by the Engineer. Shrubs and hedges overhanging the curb that interfere with construction operations shall be cut back as directed by the engineer. Existing landscaping and trees which are to remain in place must be protected from injury or damage. Existing trees must be protected with a temporary fence around the drip line.
D. Unless otherwise specified, the Contractor shall protect trees at the Contractor’s expense. Trees, bushes, and shrubs shall be removed in such a manner consistent with the health and safety of the tree climbing crew, the general public, and as to not injure standing trees, plants, and improvements which are to be preserved. Felled trees, shrubs, and bushes may be cut into sections and removed from the site. All branches, leaves, and vegetative debris may be reduced to chips. All resulting stumps are to be routed to a minimum of twenty-four (24) inches below the soil level.
E. Unless otherwise specified, all materials as shown on the drawings to be removed, or as field marked and as directed by the Engineer to be removed shall be disposed of outside the project limits. The Contractor work area shall be left with a neat and finished appearance.
F. The Contractor shall not store or permit debris to accumulate on site. If Contractor fails to remove excess debris promptly, the City reserves the right to cause removal at the Contractor’s expense.
G. Residue from cutting operations shall not be permitted to flow into storm drains or across lanes occupied by traffic and shall be removed from the pavement surface, concurrent with the cutting operation.
PW9408 SECTION D.1050 CLEARING AND GRUBBING
D-55
H. Clearing and grubbing must be conducted to ensure minimum interference with roads, street, walks, or other occupied areas.
I. When hauling is done over highways or City streets, and when directed by the Engineer, the loads must be trimmed and all material removed from shelf areas of the vehicles.
PART 2 MEASUREMENT AND PAYMENT
2.01 MEASUREMENT AND PAYMENT
A. Full compensation for furnishing labor, materials, tools and equipment required for all other clearing and grubbing shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.1060 SITE PREPARATION
D-56
SECTION D.1060 - SITE PREPARATION
PART 1 GENERAL
1.01 SCOPE OF WORK
A. The contractor shall be responsible for preparing the site for the proposed improvements, in addition to the requirements of Section D.1050, Clearing and Grubbing. The contractor shall be responsible for removing and salvaging all existing signs to be reused, and for removing and resetting or relocating materials as shown on the drawings, and for removing all other materials that are necessary to install the improvements
B. The contractor shall be responsible for all aspects of recycling all concrete and asphalt removed as a result of doing the required work. For this section recycling shall mean reuse of material in another manufactured product or reuse as some form of building or paving material. Reuse by an established recycling firm is an acceptable method of recycling, subject to approval by the Engineer. Use as daily cover material in a landfill is also an acceptable method of recycling.
C. Attention is directed to Section D.1000, Water Pollution Control, of these technical specifications for Water Pollution Control Plan (WPCP) requirements.
1.02 SALVAGED MATERIALS
A. All salvaged sign materials shall be turned over to the City of Vallejo as directed by the Engineer.
PART 2 MATERIALS
NONE
PART 3 EXECUTION
3.01 REMOVAL OF OBSTRUCTIONS
A. Existing improvements and facilities, adjacent property, utility and non- roadway facilities, and trees and plants that are not removed shall be protected from injury or damage resulting from the Contractor's operations.
B. The Contractor shall prune all shrubbery as directed and remove all structures where the proper construction and completion of the work require their removal. The Contractor shall also remove all rock, stones, debris, and all obstructions of whatsoever kind or character, whether natural or artificial,
PW9408 SECTION D.1060 SITE PREPARATION
D-57
encountered in the construction of the work.
C. Material that is removed as herein above specified, and is not to be incorporated in the improvement being constructed, shall be disposed of by the Contractor at the Contractor's sole expense.
D. Where the materials are to be removed and salvaged or removed and reset as directed on the drawings, It is the Contractor’s responsibility to ensure that these materials are not damaged during the removal and/or storage and will remain responsible for these items until such time as they are reinstalled to the satisfaction of the City Engineer or the City takes possession of them. If any damage to these items occurs while they are in the Contractor’s possession, the Contractor shall replace them with like items at a similar or better quality as approved by the City. Any replacement costs will be incurred by the Contractor at no cost to the City.
3.02 RESETTING REMOVED MATERIALS
A. The contractor shall reset the removed materials in a location as shown on the drawings and as approved by the Engineer.
B. Salvage all poles and reset signs on a new pole per COV Standard Drawing 7-07.
PART 4 MEASUREMENT AND PAYMENT
A. All work required to prepare the site for the proposed improvements shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.1070 LINES AND GRADES
D-58
SECTION D.1070 - LINES AND GRADES
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Construction surveys and stakes to establish the lines and grades will be the responsibility of the Contractor and not provided by the Engineer.
B. The Contractor shall furnish stakes and/or marks to establish lines and grades required for the completion of the work as shown on the drawings and as specified in the Standard Specification and these technical specifications. The Contractor shall furnish construction survey and staking equipment and the Contractor shall be solely responsible for maintenance and protection of the survey stakes or marks.
PART 2 MATERIALS
NONE
PART 3 EXECUTION
3.01 CONSTRUCTION STAKING
A. The Contractor will be required to provide stakes or marks in conformance with the requirements in Chapter 12, "Construction Surveys," of the Department's Surveys Manual. The Contractor’s qualified surveyor will provide one set of stakes for the following items:
1) Control Lines
2) Curbs
3) Valley Gutter
4) Grade breaks
5) Drainage Inlets and Manholes
B. Construction stakes are not required for:
1) Pavement Striping
2) Temporary Construction Items
C. Construction stakes or blue tops will be provided at all driveways and grade breaks. Construction stakes will remain in place and be made available to the engineer for inspection of the work. Any additional construction stakes that the Contractor requests shall be placed at the cost of the Contractor.
Damaged or removed stakes shall be replaced per Chapter 12, "Construction Surveys," of the Department's Surveys Manual.
D. Where new concrete and pavement meets existing, conform to existing
PW9408 SECTION D.1070 LINES AND GRADES
D-59
elevations.
E. The Contractor will be responsible for setting lines and grades for the execution and completion of the work in accordance with the Drawings and Specifications. The Contractor will be held responsible for all errors in staking discovered during the performance of the work and no additional compensation shall be charged to the City for correction of such deficiency.
F. Staking shall be performed a minimum of 2 working days prior to the time when stakes are required. Stakes will be preserved and made available for the Engineer to verify the lines and grades of the work.
PART 4 MEASUREMENT AND PAYMENT
A. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved with lines and grades, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END SECTION
PW9408 SECTION D.1200 DEMOLITION
D-60
SECTION D.1200 - DEMOLITION
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall consist of demolition and removal of any existing improvement.
B. Attention is directed to Section D.0900, “Recycling & Waste Management Plan (WMP)” of these technical specifications.
1.02 SUBMITTALS
A. Attention is directed to Section D.0900, “Recycling & Waste Management Plan (WMP)” of these technical specifications.
PART 2 MATERIALS
NONE
PART 3 EXECUTION
3.01 GENERAL
A. PROTECTION OF EXISTING FACILITIES AND PROPERTY
1. The work performed in connection with various existing facilities shall conform to the provisions in Section 15, “Existing Facilities,” Section 5-
1.36, “Property and Facility Preservation,” Section 7-1.05, “Indemnification,” and Section 7-1.06, “Insurance,” of the Standard Specifications, as well as these technical specifications.
2. The Contractor shall protect from damage any existing improvements which are to remain in place. This includes other parts of the parking lots which are to remain in in place.
3. Care shall be taken so that no vibrations or impacts which may damage adjoining improvements are caused by the demolition activities. All damage to existing facilities is the responsibility of the Contractor to repair at no cost to the City.
B. REMOVAL AND DISPOSAL
1. Existing material to be removed shall be completely removed and PW9408 SECTION D.1200 DEMOLITION
D-61
disposed of. All material removed shall become the property of the Contractor and shall be recycled or disposed of outside the street right of way in accordance with the provisions of Section 14-10, “Solid Waste Disposal and Recycling”, and Section 15-3, “Concrete Removal” of Standard Specifications and these technical specifications.
3.02 SAFETY AND PUBLIC CONVENIENCE
A. All areas of work shall be secured with barricades with attached flashing beacons and caution tape, delineators, or any other devices to adequately protect the public.
B. Adequate sidewalk/walkway closure warning signs shall be installed and as directed by the Engineer.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.1400 ELECTRICAL
D-62
SECTION D.1400 - ELECTRICAL
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall consist of all aspects of design and installation of the charging stations as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
1. Design and preparation of specifications and plans for the proposed locations per City, PG&E and industry standards and all applicable building and electrical codes.
2. Securing and complying with City Encroachment and Building permits and obtaining and renewing annually, a City Business license;
3. Installation of electrical conduits, breakers, transformer and electric connection to supply power for the complete installation and operation of the EV chargers;
4. Furnishing Chargepoint CT4027 Chargers or approved equal, EV charger material and equipment for a complete in place system;
5. Installation of signage, pavement markings and restoration of existing conditions;
6. Testing and commission of the EV charger stations;
7. Providing timely maintenance services and customer support for a period of three years from the date the City accepts the project as complete.
1.02 PLANS AND SPECIFICATIONS
A. Except otherwise provided in these Specifications, work in this section shall conform to the provisions in Section 86, “Electrical Systems” of the Standard Specifications, and the most recent City Standard Details and Specifications, and shall be applicable for any work to be performed within the public right of way.
1.03 ORDER OF WORK
A. The first order of work shall be to order all long lead time materials. The Contractor shall furnish the Engineer with a statement from the vendor that the order for said equipment has been received and accepted by said vendor.
PW9408 SECTION D.1400 ELECTRICAL
D-63
B. The Contractor shall apply for and obtain any permits necessary to complete this project. If the improvement is a capital improvement project there will be no fees; however, for development improvements the City requires that all fees be paid in advance.
C. All applicable fees including inspection fees, and the bond costs, related to the permits shall be considered as included in the contract price paid for the work involved and no additional compensation will be allowed therefore.
D. No above ground electrical work shall be performed on any system within the project site until all Contractor furnished electrical materials for the individual system have been tested and delivered to the Contractor. Work which uses processes, equipment, or materials which have not been approved is performed at the Contractor’s own risk. Work performed utilizing rejected processes, equipment, or materials will be removed, repaired, or redone at the Contractor’s expense to the satisfaction of the City.
E. Work which uses processes, equipment, or materials which have not been approved is performed at the Contractor’s own risk. Work performed utilizing rejected processes, equipment, or materials will be removed, repaired, or redone at the Contractor’s expense to the satisfaction of the City.
F. The Contractor is required to submit a traffic control plan prior to beginning any work.
The plan shall include all applicable signs according to the current California Department of Transportation Manual of Uniform Traffic Control Devices (CAMUTCD) standard including any tapers, signs, striping, or delineation. Lane widths less than 11 feet are not allowed without the permission of the City Engineer.
1.04 SUBMITTALS
A. Unless discussed elsewhere in these technical specifications, the Contractor shall allow 14 working days from the time the documents are received for the Engineer to review all product submittals. The Engineer will indicate in writing on the submittal whether it is approved or denied. If revisions are required, as determined by the Engineer, the Contractor shall revise and resubmit the submittal and shall allow an additional 14 working days from the time the equipment was resubmitted for the Engineer to review the revisions. If any of the Engineer’s comments made on the first review are not addressed in the second or subsequent submittals, the Contractor will be charged for the time the Engineer spends reviewing the submittal at the Engineer’s current rate with applicable overhead.
B. Submittal Equipment shall include but not limited to:
a. Electric Vehicle Chargers
b. Cable, conductors/wire interconnect
c. Transformers
PW9408 SECTION D.1400 ELECTRICAL
D-64
d. Charger Mounting Details
e. Ground rod
f. Conduit and conduit mounting details
g. Water based lubricant
h. Service enclosure
1.05 OBSTRUCTIONS
A. Contractor is responsible for ensuing all vehicles and equipment used on the project can access the work site.
1.06 MAINTAINING TRAFFIC
A. The Contractor shall notify the Engineer, local authorities, and emergency communications at (707) 648-4448 of the intent to close a roadway or a portion of the roadway at least 5 days before work is to begin. At any time, if the City deems necessary based on traffic conditions, a changeable message sign may be requested to properly inform motorists in advance of the closure at no cost to the City. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles
1.07 AS-BUILT DRAWINGS
A. The Contractor shall provide and keep up to date a complete set of record drawings. Such drawings shall fully represent installed conditions including actual locations of all underground site utility. The Contractor shall record all changes in the work during the course of construction on black line prints. All changes shall be neatly and legibly drawn to scale on the set of prints using standard architectural or engineering drafting practices. A list of the serial number and model of the equipment used at each location shall also be kept. After completion of the job, the as built plans and specifications shall be delivered to the Engineer in full size hard copy.
PART 2 MATERIALS
NONE
PART 3 EXECUTION
3.01 CONDUCTORS AND WIRING
A. Splices are not allowed.
PW9408 SECTION D.1400 ELECTRICAL
D-65
B. All conductors shall be secured and clearly labeled.
C. The Contractor shall provide the Engineer a Certificate of Compliance from the manufacturer in accordance with the provisions of Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifcations, for all the conductors and cables furnished for the project.
D. All conductors shall be Copper.
E. All wiring shall be connected to a terminal strip and neatly tie wrapped. No Wiring shall hang loose.
3.02 PRE-SYSTEM TURN-ON PROCEDURE
A. System shall be fully functional and Contractor shall safety check all items before system turn-on is requested.
B. All equipment shall be installed before system turn-on is requested.
3.03 REMOVING, REINSTALLING OR SALVAGING ELECTRICAL EQUIPMENT
A. Salvaged electrical equipment shall be hauled to the City of Vallejo Corp Yard. For delivery destinations and instructions, contact City of Vallejo Maintenance Division, 111 Amador Street, Vallejo CA 94590, (707) 648-4518.
B. The Contractor shall provide equipment, as necessary, to safely unload and stockpile the material. The Contractor shall notify and coordinate with Maintenance Division staff prior to delivery.
C. If so indicated on the plans, the Contractor shall remove and dispose of existing equipment and material no longer required. Full compensation for removal and disposal of said equipment and material shall be considered as included in the contract lump sum or unit prices paid for the various items of work involved and no additional compensation will be allowed therefore.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
B. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved, including removing, reinstalling, installing or salvaging electrical equipment, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
PW9738 SECTION D.1500 AGGREGATE BASE
D-66
SECTION D.1500 - AGGREGATE BASE
PART 5 GENERAL
5.01 SCOPE OF WORK
A. This work shall consist of furnishing, placing and compacting Class 2 aggregate base (rock cushion) as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
PART 6 MATERIALS
6.01 AGGREGATE BASE
A. Aggregate Base shall be Class 2, 3/4-inch maximum aggregate and shall conform to Section 26, “Aggregate Bases,” of the Standard Specifications and these technical specifications.
PART 7 EXECUTION
7.01 GENERAL
A. Prior to excavation for aggregate base section, Contractor shall contact Underground Service Alert for identification of underground facilities, including water, sewer, and storm drain lines.
B. The Contractor shall ensure the sub-base or subgrade is compacted to 95% relative density before placing aggregate base.
7.02 PLACEMENT
A. The aggregate base shall be placed and graded as necessary to conform to grade of proposed surfacing.
7.03 WATERING
D. Contractor shall provide water to moisturize aggregate base rock as necessary to obtain the required compaction.
7.04 COMPACTION
A. The relative density of each layer of compacted aggregate base rock material shall be not less than 95 percent within roadway, including under curb and gutter, and not less than 90 percent within sidewalk areas. Testing shall be as determined by the ASTM D-1557 test method.
PW9738 SECTION D.1500 AGGREGATE BASE
D-67
B. Compaction testing of the work shall be at the direction of the Engineer.
Initial compaction testing will be the responsibility of the Engineer. However, the Contractor shall be responsible for all costs associated with the retesting of areas which fail to meet the specified densities.
C. The maximum compacted thickness of any one layer of aggregate base must not exceed 6 inches.
7.05 PORTABLE WATER VEHICLES
A. The Contractor shall provide and operate a portable water vehicle to deliver water for general construction purposes and material moisture conditioning (such as aggregate base rock), for equipment and general dust control. The Contractor shall be continuously prepared to utilize portable water vehicle throughout the course of the project to immediately mitigate airborne dust nuisance.
B. Full compensation for furnishing , hauling and operating a portable water vehicle (such as a water truck), including the water, shall be considered as included in the various contract items of work and no additional compensation will be allowed therefor.
PART 8 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
C. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved including transporting, storing, placing, moisturizing, and compacting aggregate base, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-68
SECTION D.1600 - HOT MIX ASPHALT (TYPE A)
PART 1 GENERAL
1.01 SCOPE OF WORK
A. This work shall consist of removal of existing asphalt road surface by way of cold milling, sawcutting, or by use of other equipment as becomes necessary as shown on the drawings, and the overlay of areas of pavement removal as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
B. Throughout all aspects of work involved in this section, Contractor shall provide the necessary equipment and labor to sweep and clean the work areas before allowing traffic to pass and before the end of each work day.
C. Attention is directed to Section D.0900, “Recycling & Waste Management Plan (WMP)” of these technical specifications.
PART 2 MATERIALS
2.01 ASPHALT CONCRETE
A. Hot mix asphalt, related products and paving work shall comply with Section 39, “Hot Mix Asphalt”, of the 2018 Standard Specifications.
B. Hot mix asphalt (HMA) for surface course paving shall be Type A, 1/2-inch aggregate gradation, with bituminous binder of steam-refined paving asphalt of PG 64-10 viscosity.
2.02 TEMPORARY ASPHALT CONCRETE
A. Temporary asphalt concrete shall be at the Contractor’s option either Caltrans approved Type A or B asphalt concrete or asphaltic cutback.
B. If used, Temporary asphaltic cutback shall conform to Bay Area Air Quality Management District's Regulation 8, Rule 15, entitled "Cutback Asphalts."
PART 3 EQUIPMENT
3.01 TRANSPORTING EQUIPMENT
A. Transporting equipment shall be end, bobtail or bottom dump trucks. The asphalt concrete mixture shall be transported from the plant to the work site in sealed vehicles, previously cleaned of all foreign materials and shall be covered with canvas or other suitable material approved by the Engineer.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-69
In case oil is used to prevent the adhesion of the mixture to the bed of the vehicle, an excess of oil shall not be permitted. No loads shall be sent out so late in the day as to interfere with spreading and compacting the mixture during daylight.
B. All trucks transporting HMA shall use approved City Truck Routes. Contact the City for the latest approved routes.
3.02 COMPACTING EQUIPMENT
A. The Contractor shall furnish compacting equipment with capability to obtain a minimum relative asphalt density of 91.0 to 97.0 percent and surface finishing as required by these specifications and Standard Specifications.
3.03 COLD PLANING / GRINDING EQUIPMENT
A. Cold planing machines shall be equipped with a cutter head not less than 36 inches in width and shall be operated so as not to produce fumes or smoke. The cold planing machine shall be capable of planing the pavement without requiring the use of a heating device to soften the pavement during or prior to the planing operation. Cold planing machine shall be a motorized pavement planing machine consisting of tractor unit mounted on hydrostatically driven crawler track assemblies with reclaiming conveyor.
The cutting units shall be direct drum drive. The cutting chamber shall be enclosed and shrouded. The machine shall be equipped with automated depth and slope controls for the cutter assembly. The cutter assembly shall be independent of the main suspension system with reclaiming conveyor.
B. Transporting Equipment - Transporting equipment shall be end or bottom dump trucks. The asphalt concrete mixture shall be transported from the plant to the work site in sealed vehicles, previously cleaned of all foreign materials and shall be covered with canvas or other suitable material approved by the Engineer. In case oil is used to prevent the adhesion of the mixture to the bed of the vehicle, an excess of oil shall not be permitted.
No loads shall be sent out so late in the day as to interfere with spreading and compacting the mixture during daylight.
C. Spreading Equipment - In addition to the requirements in Section 39 of the Standard Specifications, equipment for paving shall be track mounted with automatic side slope of screed. The paver shall be equipped with automatic screed controls and a sensing device or devices that will reproduce the grade in the new asphalt layer within a 0.01-foot tolerance. The asphalt paver shall be equipped with automatic vibration on the screed and the screed shall be solid at full width. The asphalt paver shall be equipped with extended end gates.
D. The use of asphalt windrow pickup spreading machines will be allowed on this project.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-70
E. When paving contiguously with previously laid asphalt, the end of the screed adjacent to the previously laid asphalt shall be controlled by a sensor that responds to the grade of the previously laid asphalt and will reproduce the grade in the new asphalt layer within a 0.01-foot tolerance. The end of the screed farthest from the previously laid asphalt shall be controlled in the same manner as when placing the previously laid asphalt.
F. Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Section 39-1.12B, "Straightedge," of the Standard Specifications, the paving operations shall be discontinued, and the Contractor shall modify his equipment or furnish substitute equipment.
G. Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day, however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this section before starting another day's work.
H. Paving machines smaller and less sophisticated than what is required for placing HMA will be permitted for spreading asphalt in narrow dig outs subject to approval by the Engineer.
I. Compacting Equipment - The Contractor shall furnish a sufficient number of rollers to obtain a minimum relative asphalt density of 97 percent and surface finish required by these specifications.
J. All rollers shall be equipped with pads and water systems which prevent sticking of asphalt mixtures to the pneumatic- or steel-tired wheels. A parting agent that will not damage the asphalt mixture, as determined by the Engineer, may be used to aid in preventing the sticking of the mixture to the wheels. If the contractor chooses to use a parting agent rather than water, the contractor must submit the parting agent product to the Engineer for approval prior to beginning work.
PART 4 EXECUTION
4.01 DRIVEWAY ACCESS
A. Means of vehicular access to all driveways over the work area shall be approved prior to start of work and as directed by the Engineer. Furnishing and installing temporary asphalt transitions and/or steel plates shall be in conformance with Section D.0700 Traffic and Access Control elsewhere in these technical specifications and as directed by the Engineer.
4.02 PROTECTION OF EXISTING FACILITIES AND PROPERTY
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-71
A. The Contractor shall contact USA North at 811 or 800-227-2600, in advance so that all utilities are marked prior to beginning sawcutting and demolition work.
B. Care shall be taken so that no vibrations or impacts which may damage adjoining properties are caused by the demolition and removal of concrete.
All damage to private or public facilities and property during construction is the responsibility of the Contractor to repair at no cost to the City.
Additionally, the Contractor is reminded to provide a continuously available source of dust control during the work.
C. If, during the process of demolition or removal, any of the existing asphalt concrete to remain (and in sound condition free of pre-existing cracking) becomes cracked, chipped or broken during the course of work, it shall be saw cut again to provide a straight edge, and resulting material removed and replaced at the Contractor's expense.
D. Care shall be taken to protect and work around and between existing utility boxes, subsurface utility lines, and traffic sign poles through the course of work involved under this section.
4.03 ASPHALT REMOVAL
A. Where concrete is to be constructed adjacent to existing asphalt pavement, the existing asphalt pavement and underlying roadway material, measured from the concrete edge, shall be sawcut and removed prior to forming of new concrete sidewalk, curb and gutter as shown on the drawings.
4.04 SAWCUTTING
A. Where existing asphalt pavement and roadway base material is to be removed, the section of each area to be removed shall be sawcut full depth with an abrasive type saw to 12 inches away from existing concrete edge or to a distance directed by the Engineer.
B. Sawcutting work shall be accompanied by vacuuming for disposal of slurry waste in accordance with the Water Pollution Control Plan (WPCP).
C. The Contractor shall sawcut neatly and orthogonally and employ appropriate technique and effort to prevent unnecessary lines from being cut past intended boundaries and shall make corrections as directed by the Engineer.
D. The Contractor shall cut on orthogonal neat lines and employ appropriate technique and effort to prevent unnecessary cuts in pavement surfaces to remain, as directed by the Engineer.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-72
4.05 DIGOUT & SURFACE PREPARATION
A. The Contractor shall notify the Engineer a minimum of 48 hrs. in advance for a field meeting, in order for the Contractor to mark the limits of existing asphalt removal (digouts and cold planing) under the direction of the Engineer.
B. The Contractor shall coordinate scheduling to notify Underground Service Alert (USA) for identification of utilities with the various areas of work.
C. Exposed ground remaining after removal of existing pavement material shall be cleared of organic material and debris and thoroughly compacted to the satisfaction of the City Inspector.
D. The surrounding street surface shall be cleaned and free of all deleterious and loose material prior to beginning installation of the new pavement section.
E. All patch work and cold pavement planing shall be completed prior to pavement surface cleaning.
G. Existing weeds and vegetation within the area of work shall be removed prior to paving operations.
4.06 COLD PLANE ASPHALT CONCRETE PAVEMENT
A. Existing asphalt concrete pavement shall be cold planed at the locations and to the dimensions shown on the drawings and as directed by the Engineer. Planing asphalt concrete pavement shall be performed by the cold planing method. Planing of the asphalt concrete pavement shall not be done by the heater planing method. Cold planing shall include removal of existing asphalt concrete and aggregate base to the depths shown on the drawings.
B. All material planed from the roadway surface, including material deposited on or beyond sidewalks, in existing gutters or on the adjacent traveled way, shall be removed and disposed of outside the right of way in accordance with the provisions of Section 14-10, “Solid Waste Disposal and Recycling” and Section D.0900 “Recycling & Waste Management Plan (WMP)” of these technical specifications. Removal operations of cold planed material shall be concurrent with planing operations and follow within 50 feet of the planer, unless otherwise directed by the Engineer. All planed material will be removed to the Engineer’s satisfaction by the end of each work day.
C. Existing asphalt concrete left in place around the utility covers as a result of PW9408 SECTION D.1600 HOT MIX ASPHALT
D-73
lifting the drum of the grinder shall be ground or removed by other means to the depth and shape as indicated on the drawings, and as directed by Engineer and no additional payment will be made therefor. Planed widths of pavement shall be continuous unless otherwise shown on the drawings or directed by the Engineer.
D. The material remaining in place, after removing surfacing and base material to the required depth shall be graded to a plane, watered and compacted to a relative density of 95 percent as determined by California Test 375. The finished surface of the remaining material shall not extend above the grade established by the Engineer.
E. The City has indicated on the drawings the locations of all utility covers of which it has knowledge. The City assumes no liability for loss of time or for repair of equipment damaged due to any visible or buried objects not shown on the drawings.
F. The outside lines of the planed area shall be neat and uniform. Planing asphalt concrete pavement operations shall be performed without damage to the surfacing to remain in place. Planed widths of pavement shall be continuous unless otherwise shown on the drawings or directed by the Engineer.
G. Contractor shall coordinate the paving back of cold milled areas within same working day if practicable to avoid leaving uneven pavement surfaces and protruding utilities.
H. Where transverse joints are planed into the pavement at conforms no drop-off shall remain between the existing pavement and the planed area when the pavement is opened to public traffic. If asphalt concrete has not been placed to the level of existing pavement before the pavement is to be opened to public traffic a temporary asphalt concrete taper shall be constructed. Asphalt concrete for temporary tapers shall be placed to the level of the existing pavement and tapered on a slope of 30:1 or flatter to the level of the planed area or as shown on the drawings and specified by the Engineer.
I. Operations shall be scheduled such that not more than 2 days shall elapse between the time when existing surfacing is planed and the permanent surfacing is placed.
4.07 PAVING PREPARATION
A. Exposed ground remaining after removal of existing pavement material shall be cleared of organic material and debris, and compacted to 95% relative compaction.
B. The surrounding street surface shall be cleaned and free of all deleterious and loose material.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-74
C. A paint binder (tack coat) shall be applied to all vertical surfaces of existing pavement, curbs, gutters, and construction joints against which HMA is to be placed, and to existing pavement to be surfaced., including leveling courses, and transverse and longitudinal joints of layers placed the same day and to other surfaces designated in the drawings and by the Engineer prior to placing a new asphalt surfacing on it. Prior to the application of paint binder (tack coat), the street shall be cleaned to the satisfaction of the Engineer. Full compensation for supplying and placing tack coat shall be considered as being included in the contract prices paid for asphalt concrete and no separate payment will be made therefor.
D. The area to which paint binder has been applied shall be closed to public traffic. Care shall be taken to avoid tracking binder material onto existing pavement surfaces beyond the limits of construction. Paint binder and asphalt concrete tracked onto existing pavement surfaces, including but not limited to Portland cement concrete curb, gutter and sidewalk, shall be cleaned to the satisfaction of the Engineer.
E. The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 feet nor less than 5 feet. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
F. Before placing the layer adjacent to cold transverse construction, such joints shall be trimmed to a vertical face and to a neat line. Transverse joints shall be tested with a 12-foot straightedge and shall be cut back as required to conform to the requirements specified in Section 39 of the Standard Specifications. Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such a condition that the quality of the completed joint will be affected.
4.08 TRANSPORTING ASPHALT CONCRETE
A. The asphalt concrete mixture shall be transported from the plant to the work in tightly enclosed vehicles, previously cleaned of all foreign materials and shall be covered with canvas or other suitable material approved by the Engineer. In case oil is used to prevent the adhesion of the mixture to the bed of the vehicle, an excess of oil shall not be permitted. No loads shall be sent out so late in the day as to interfere with spreading and compacting the mixture during daylight.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-75
B. All trucks transporting HMA shall use approved City Truck Routes. Contact the City for the latest approved routes.
4.09 FINISHING OF PAVEMENT
A. Additional asphalt concrete surfacing material shall be placed along the edge of the surfacing at private drives, hand raked, if necessary, and compacted to form smooth tapered conforms. Asphalt concrete placed in layers less than 0.15-foot in compacted thickness or widths of less than five (5) feet shall be spread and compacted with the equipment and by the methods specified in Section 39 of the Standard Specifications. Full compensation for furnishing all labor, tools and equipment and for doing all the work necessary to hand rake said conforms shall be considered as included in the contract prices paid per ton for the various contract items of HMA paving and no additional compensation will be allowed therefor.
B. Placing of the asphaltic concrete adjacent to the lips of gutters shall be such that a rise above said lips of 1/4 inch shall remain after compaction.
C. Compacting shall be performed in such a manner that cracking, shoving, or displacement will be avoided. The motion of the compacting equipment shall at all times be slow enough to avoid displacement of the hot mixture and any displacement occurring as a result of reversing the direction of the compacting equipment or from any other cause shall at once be corrected by the use of rakes and of fresh mixture where required. The contact surface of the compacting equipment shall be properly moistened to prevent adhesion of mixture, but an excess of water or other materials shall not be permitted.
D. The completed surface shall be thoroughly compacted, smooth, and true to grade and cross section, free from ruts, humps, depressions or irregularities.
E. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete by equipment shall be eliminated by rolling or other means. The use of any equipment that leaves ridges, indentations or other objectionable marks in the asphalt concrete shall be discontinued and other acceptable equipment shall be furnished by the Contractor.
F. If the finished surface of the asphalt concrete does not meet the specified surface tolerances, it shall be brought within tolerance by either (1) abrasive grinding (with fog seal coat on the areas which have been ground), (2) removal and replacement, or (3) placing an overlay of asphalt concrete.
The method will be selected by the Engineer. The corrective work shall be completed at the Contractor's expense.
G. If abrasive grinding is used to bring the finished surface to specified surface tolerances, additional grinding shall be performed as necessary to extend
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-76
the area ground in each lateral direction so that the lateral limits of grinding are at a constant offset from, and parallel to the nearest lane line or pavement edge, and in each longitudinal direction so that the grinding begins and ends at lines normal to the pavement centerline, within any ground area. All ground areas shall be neat rectangular areas of uniform surface appearance
H. Public traffic shall be permitted the use of the street area providing that such traffic does not interfere with the continuity of the paving operations. When street work operations are suspended, all equipment shall be removed from the portions of the streets that are to be used by public traffic. Where work is unfinished at a pedestrian crosswalk at the end of a working day, the edge of the paved surface to said crosswalk shall be feathered to provide a smooth pathway for foot traffic. The pavement shall be protected from traffic until thoroughly cooled and set.
I. Finishing roadway shall conform to Section 22 of the Standard Specifications. The entire roadway and right-of-way shall be left in a neat and presentable condition to the satisfaction of the Engineer.
4.10 TEMPORARY ASPHALT
A. Temporary asphalt shall be placed at the direction of the Engineer.
B. Temporary asphalt concrete shall be at the Contractor’s option either Caltrans approved Type A or B asphalt concrete or asphaltic cutback.
C. Asphalt concrete for temporary tapers shall be commercial quality and may be spread and compacted by any method that will produce a smooth riding surface. Temporary asphalt concrete tapers shall be completely removed, including the removal of all loose material from the underlying surface, before placing the permanent surfacing. Such removed material shall be disposed of outside the right of way in accordance with the provisions of Section 14-10, “Solid Waste Disposal and Recycling”.
D. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms.
Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
E. Asphalt concrete for temporary tapers shall be placed to the level of the existing pavement and tapered on a slope of 20:1 or flatter to the level of the planed area.
PW9408 SECTION D.1600 HOT MIX ASPHALT
D-77
PART 5 MEASUREMENT AND PAYMENT
5.01 MEASUREMENT AND PAYMENT
A. Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in removing and placing asphalt concrete, complete in place, including hot mix asphalt, tack coat, asphaltic emulsion (paint binder), compaction, hauling, cleanup, and other incidental work, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract bid items and no additional compensation will be allowed therefor.
B. Full compensation for furnishing labor, materials, and equipment for installing means of vehicular access across open asphalt excavations at driveway entrances by end of work day, including temporary asphalt transitions shall be considered as in the prices paid for the various contract bid items and no additional compensation will be allowed therefor.
C. Full compensation for field coordination, including administration, labor, materials and field time required to coordinate with the City to mark the exact limits of asphalt removal, to measure quantities jointly in the field, to review incidental construction problems, punch list review meetings, and coordination with USA for identification of utilities within work areas shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
D. Full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work for surface cleaning shall be considered as included in the contract unit prices paid for the various items of work and no additional compensation will be allowed therefor.
E. Quantities of materials wasted or disposed of in a manner not called for under the Contract, or rejected loads of material, including material rejected after it has been placed by reason of the failure of the Contractor to conform to the provisions of the Contract, or material remaining on hand after completion of the work, will not be paid for. No compensation will be allowed for hauling and disposing of rejected material.
END OF SECTION
PW9408 SECTION D.1700 CONCRETE
D-78
SECTION D.1700 - CONCRETE
PART 4 GENERAL
4.01 SCOPE OF WORK
A. This work may consist of sawcutting, demolition and removal of existing Portland Cement Concrete (PCC or “concrete”) hardscape, excavation and removal of existing ground materials, grading and compaction of subgrade and imported aggregate base rock, concrete construction for utility adjustments, and related items of work of the form and dimensions as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer.
B. Concrete work shall conform to Section 73, “Concrete Curbs and Sidewalks”, and Section 90, “Concrete”, of the Standard Specifications and these technical specifications.
C. Attention is directed to Section D.0900, “Recycling & Waste Management Plan (WMP)” of these technical specifications.
4.02 SUBMITTALS
A. Concrete Mix Design - The proportions of the concrete materials in the mix shall be the responsibility of the Contractor. At least 14 days prior to placement of concrete, the Contractor shall submit the concrete mix design and compression test reports to the City for approval. Mixture proportions shall include dry weights of cement, saturated surface-dry weights of fine and coarse aggregates and quantities, type and name of admixture (if any) and quantity of water in cubic yards of concrete. All material included in the mixture proportions shall be of the same type and from the same sources as will be used on the project. No admixture containing chloride shall be used.
B. Lamp Black - Manufacturer product data for lamp black to be integrated with concrete mix.
C. Curing Method / Compound – Comply with Section 90 of the Standard Specifications.
PART 5 MATERIALS
5.01 CONCRETE
A. Concrete Mix Requirements:
1. Portland Cement Content: 590lbs. minimum per cubic yard, Type I/II
PW9408 SECTION D.1700 CONCRETE
D-79
2. Compressive Strength: 3000 psi minimum at 28 days
3. Water / Cement Ratio: 0.50 maximum
4. Slump: 3.5” maximum
5. Lamp Black: 1 lb. per cubic yard
In the event the desired compressive strength is not attained, the Contractor shall remediate deficient concrete as directed by the Engineer at no additional cost to the City.
B. Aggregate for concrete shall conform to the grading for 1-inch maximum combined aggregate as set forth in Section 90 of the Standard Specifications.
C. Mortar used in modifying manhole base shall conform to the provisions in Section 51-1.02F, "Mortar" of the Standard Specifications.
5.02 REINFORCING STEEL BARS
A. Reinforcing steel bars shall be of Grade 40 or higher and conform to Section 52, “Reinforcement”, of the Standard Specifications. Tie wire shall be 18- gauge steel.
5.03 AGGREGATE BASE
A. Aggregate base shall conform to Section D.1500 “Aggregate Base” of these technical specifications.
5.04 HOT MIX ASPHALT
A. Hot mix asphalt for AC overcuts shall conform to Section D.1600, “Hot Mix Asphalt (Type A)” of these technical specifications.
PART 6 EXECUTION
6.01 DEMOLITION AND REMOVAL OF EXISTING CONCRETE AND GROUND
A. PROTECTION OF EXISTING FACILITIES AND PROPERTY
1. The work performed in connection with various existing facilities shall conform to the provisions in Section 15, “Existing Facilities,” Section 5-
1.36, “Property and Facility Preservation,” Section 7-1.05, “Indemnification,” and Section 7-1.06, “Insurance,” of the Standard Specifications, as well as these technical specifications.
2. The Contractor shall protect from damage any utilities and other existing facilities, including but not limited to surrounding landscape features, irrigation systems, concrete, ground cover, vegetation, fences, and retaining walls, which are to remain in in place.
PW9408 SECTION D.1700 CONCRETE
D-80
3. The Contractor shall contact USA North at 811 or 800-227-2600, in advance so that all utilities are marked prior to beginning saw cutting and demolition work.
4. Care shall be taken so that no vibrations or impacts which may damage adjoining properties are caused by the demolition and removal of concrete. All damage to private or public facilities and property during construction outside the limits of concrete to be replaced is the responsibility of the Contractor to repair at no cost to the City.
5. If, during the process of demolition or removal any concrete to remain becomes cracked, chipped or broken, it shall be sawcut at the nearest score mark, removed and replaced at the Contractor's expense.
6. Care shall be taken to protect and work around and between existing utility boxes, subsurface utility lines, and traffic sign poles through the course of work involved under this section.
B. SAWCUTTING
1. Sawcuts shall be made on the nearest expansion or weakened plane joint or score line, or as directed by the Engineer. Sawcuts must go entirely through concrete. Cut concrete shall be removed without damaging the concrete that is to remain in place, or any other structures or improvements adjacent to the cut concrete.
2. The Contractor shall sawcut neatly and orthogonally and employ appropriate technique and effort to prevent unnecessary lines from being cut past intended boundaries and shall make corrections as directed by the Engineer.
3. Where no joint exists between concrete to be removed and concrete to remain in place, the concrete shall be cut on a neat line to a minimum depth of 4-inches with a power-driven saw before the concrete is removed.
C. REMOVAL AND DISPOSAL
1. Existing concrete to be removed shall be completely removed and disposed of in conformance with the provisions in Section 14-10, “Solid Waste Disposal and Recycling,” and Section 15-3, “Concrete Removal”, of the Standard Specifications and Section D.0900 “Recycling & Waste Management Plan (WMP)” of these technical specifications, as shown on the drawings, and as directed by the Engineer.
PW9408 SECTION D.1700 CONCRETE
D-81
2. The Contractor shall remove existing facilities which interfere with construction as shown on the drawings. Removed facilities shall be disposed of, salvaged, relaid, reset, relocated, or reconstructed as specified in the Standard Specifications and these technical specifications.
3. The work involving concrete removal shall include excavation to the depth necessary to provide the specified thickness of aggregate base and the removal and disposal of ground material.
4. Where concrete is removed adjacent to existing asphalt pavement, a minimum of 12-inches in width of the existing asphalt pavement measured from the concrete edge and 6-inches minimum of material in depth shall be sawcut and removed.
5. Broken concrete, asphalt, tree roots, earth and all other incidental debris required to be removed will become the property of the Contractor.
6. All material removed shall become the property of the Contractor and shall be recycled or disposed of outside the street right of way in accordance with the provisions of Section 14-10, “Solid Waste Disposal and Recycling”, and Section 15-3, “Concrete Removal” of Standard Specifications and these technical specifications.
6.02 LAYOUT, GRADING AND GROUND PREPARATION
A. The Contractor shall be responsible for determining the depths and slopes to excavate in addition to performing layout for grading elevations and concrete formwork based on existing adjacent sidewalk, curb and gutter, or other surfaces, in order to correctly install the finished concrete products specified in the Contract Documents.
In addition to layout and grading, included in the work scope of this section is compaction of subgrade and supply, placement, grading and compaction of the Class 2 aggregate base rock cushion in preparation for concrete work. All subgrade shall be compacted to a relative compaction of 95%.
6.03 SAFETY AND PUBLIC CONVENIENCE
A. Any open sidewalk, curb ramp and roadway excavations shall be secured with barricades with attached flashing beacons and caution tape, delineators or any other devices to adequately protect the public.
B. Adequate sidewalk closure and roadway warning signs shall be installed and as directed by the Engineer.
C. Within practicability and for public convenience, concrete work at
PW9408 SECTION D.1700 CONCRETE
D-82
intersections shall be scheduled for removal by the Contractor so that one side of the more heavily trafficked road is not excavated within 100 feet of the intersection prior to the other side having been completed with new concrete.
6.04 DRAINAGE AND MOISTURE MITIGATION
A. Existing drainage patterns shall be verified and maintained by Contractor with installation of all new concrete construction.
B. Where the installation of curb and gutters or sidewalks may adversely affect existing drainage patterns, such areas shall be immediately brought to the Engineer's attention.
C. Open excavations shall be covered and protected from rain and surrounding surface runoff in order to minimize excessive ground moisture saturation.
Ground moisture saturation and ponding caused by unchecked rain and surface runoff shall be mitigated at the Contractor’s expense per the direction of the City representative.
6.05 CURB AND GUTTER AND SIDEWALK
A. Curb and gutter and sidewalk shall conform to the project drawings, City of Vallejo Standard Drawing No. 3-10 titled "Curb, Gutter, and Sidewalk", and these technical specifications.
6.06 DOWEL INSTALLATION
A. Dowel installation shall conform to City of Vallejo standard detail titled "Standard Curb, Gutter, and Sidewalk Doweling Detail", Drawing No. 3-8.
Holes shall be drilled into existing improvements at the locations shown on the above detail, to a depth equal to one-half of the length of the dowel to be installed. Dowel shall be epoxy anchored into drilled hole. New concrete shall be poured around the exposed half of the dowel.
6.07 DETECTABLE WARNING SURFACE
A. Detectable Warning Surface installation shall conform to the project drawings, and the City of Vallejo Standard Specifications and Drawings and these technical specifications.
6.08 FORMS
A. The suitability of form material for each application is left to the discretion of the Inspector.
B. The Contractor shall form around trees and power poles encroaching into PW9408 SECTION D.1700 CONCRETE
D-83
the sidewalk as directed by the Inspector.
C. All forms and construction debris are to be removed within three working days after concrete is poured.
6.09 EXPANSION JOINTS
A. Expansion joints shall be placed between public walks and driveways and where private walks and private driveways abut public walks and shall conform to the project drawings, City of Vallejo standard detail titled "Expansion and Other Joint Details", Drawing No. 3-9, these technical specifications, and as directed by the Engineer.
B. Expansion joint material shall be pre-molded fillers 3/8-inch thick, by 4 inches wide by the length of the abutting concrete structure.
6.10 PRE-INSPECTION
A. No concrete shall be poured until the Engineer has inspected and approved the grading, forms, and dowels.
6.11 SCORE MARKS AND CONTROL JOINTS
A. Score markings shall be placed every four linear feet transversely along the sidewalk. Score markings shall match as nearly as possible those in adjacent existing curbs, gutters and sidewalks or shall be placed as directed by the Engineer.
B. Deep joints shall be placed every 12 linear feet transversely along the sidewalk, curb and gutter, and shall be one quarter the depth of the concrete or one inch minimum. Weakened plane joints shall be placed at the beginning and the ending of a return, as shown on the City of Vallejo Standard Detail 3-09 and 3-11.
C. Construct all score marks and control joints properly aligned perpendicularly with the face of curb.
6.12 CONCRETE SURFACE FINISH
A. The concrete surface finish shall be a medium-bristled broom finish, of uniform roughness and coloration.
6.13 CONCRETE PROTECTION
A. The Contractor shall protect the newly placed concrete from damage, disfiguration or vandalism. Damaged, disfigured or vandalized areas shall
PW9408 SECTION D.1700 CONCRETE
D-84
be refinished or replaced at the direction of the Engineer.
B. The method of refinishing must be approved by the Engineer.
6.14 ACCEPTANCE OF CONCRETE
A. Acceptance of the finished product will be the decision of the Engineer.
B. Cracking - New areas of concrete containing a group of numerous cracks or any number of opened or spalling cracks shall be removed and replaced at the direction of the Engineer. Crack patching is not allowed.
C. Rough Finishes – New areas of concrete with rough, granular or bumpy finishing, shall be removed and replaced at the direction of the Engineer.
D. Discoloration – Spots, stains or variations in the concrete color deemed by the Engineer to be unsightly shall be repaired or removed and replaced at the direction of the Engineer.
E. Defaced (or vandalized) concrete shall be replaced at the direction of the Engineer.
6.15 TOPSOIL BACKFILLING
A. Contractor shall backfill voids where new concrete meets existing dirt or landscaped ground within three working days after concrete has been poured, especially along planter strips, front yards and behind new curb ramps and sidewalk, with approved topsoil.
B. Contractor shall create a smooth grade and transition to new concrete not to exceed a maximum slope of 5:1 unless approved by the Engineer.
C. The topsoil backfill shall be placed and compacted so that finished grade is 1 inch below surface of concrete edge.
6.16 LANDSCAPE RESTORATION
A. Landscape groundcover, decorative rock, grass, borders or other landscaping materials shall be replaced equivalently or better than pre- existing conditions as much as is practicable and reasonable. Irrigation systems shall also be repaired and restored to pre-existing function.
6.17 CLEANUP
A. Cleanup shall occur on a daily basis. No construction debris of any kind is to be left on site overnight. Lawns and planter strips adjacent to the work area shall be kept clean and free of all types of debris. The sidewalk and
PW9408 SECTION D.1700 CONCRETE
D-85
street are to be swept at the direction and to the satisfaction of the City representative.
B. After backfilling has been completed, cleanup shall occur so that the site is cleared to the same condition as before construction commenced.
PART 7 MEASUREMENT AND PAYMENT
A. Full compensation for aggregate base used for the construction of miscellaneous concrete items of work, including aggregate base used below asphalt concrete overcut adjacent to curb ramp and curb and gutter, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
B. Full compensation for complying with the other requirements of the above provisions, including securing a dump site and method of recycling concrete and asphalt, hauling, removing, disposing of or stockpiling materials, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
C. Full compensation for removing aggregate base and other materials as part of this work shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
D. Full compensation for sawcutting existing concrete as part of this work shall be included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
E. Full compensation for concrete items of work, including furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in placement of concrete shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.1900 STRIPING AND SIGNING
D-86
SECTION D.1900 - SIGNING, STRIPING AND PAVEMENT MARKING PART 1 GENERAL
1.01 SCOPE OF WORK
A. Traffic striping, pavement markings and pavement markers shall conform to the provisions in Sections 84, “Traffic Stripes and Pavement Markings,” and 85, “Pavement Markers,” of the Standard Specifications and these technical specifications. Temporary pavement delineation shall conform to the provisions in Section 12-3, “Traffic-Handling Equipment and Devices,” of the Standard Specifications and these technical specifications. Nothing in these technical specifications shall be construed as reducing the minimum standards specified in the California MUTCD or as reliving the Contractor from the responsibilities specified in Section 7-1.04, “Public Safety,” of the Standard Specifications.
PART 2 MATERIALS
2.01 GENERAL
A. All materials whether temporary or permanent shall conform to the Caltrans Standard Specifications and California MUTCD.
B. Certificates of compliance shall be furnished for all signing and delineation materials and products in this section including but not limited to temporary pavement delineation materials, temporary reflective raised pavement markers, thermoplastic pavement striping and marking material, glass beads and pavement markers, as specified in Section 6-1.07, "Certificates of Compliance," of the Standard Specifications. Said certificate shall also certify that the signing and delineation material or product conforms to the prequalified testing and approval of the Department of Transportation, Division of Traffic Operations and was manufactured in accordance with the approved quality control program.
C. Approval of such materials or products will be dependent upon a determination as to compliance with the specifications and any test performed.
2.02 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS
A. Thermoplastic traffic stripes (traffic lines) and pavement markings shall conform to the provisions in Sections 84-1, "General," and 84-2, "Thermoplastic Traffic Stripes and Pavement Markings," of the Standard Specifications and these technical specifications.
B. Permanent pavement striping tape will not be allowed.
PW9408 SECTION D.1900 STRIPING AND SIGNING
D-87
2.03 ROADSIDE SIGNS
A. Roadside Signs shall conform to the provisions in Sections 56-2, "Roadside Signs," of Caltrans Standard Specifications, section 3.3.39 of the City Standard Specifications and these technical specifications.
B. Warning and regulatory signs shall conform to the California Department of Transportation’s Specifications for Type IIIA Reflective Sheeting Aluminum Signs, dated April 1992. Copy of the specifications may be obtained from the California Department of Transportation’s office of Business Management and Materials Operations Branch, 1900 Royal Oaks Drive, Sacramento, CA 95815, Telephone (916) 322-2137.
C. Sign substrate materials shall be sheet aluminum. Sheet aluminum shall be not less than 0.063-inch thick for sign widths less than 42 inches and not less than 0.080-inch thick for sign widths 42 inches and greater. For street name signs, the substrate materials shall be sheet aluminum not less than
0.125-inch thick.
D. Signs shall be installed on metal posts conforming to the details shown on the City of Vallejo Standard Drawings.
E. Concrete used for the footings shall conform to Section D.1700 Concrete.
PART 3 EXECUTION
3.01 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS
A. Existing thermoplastic traffic stripes and pavement markings, when no longer required for traffic lane delineation as directed by the Engineer, shall be removed and disposed of. Such removed material shall be disposed of outside the right of way in accordance with the provisions in Section 7─1.13 of the Standard Specifications. Removal of thermoplastic traffic stripes & pavement markings shall be by industry standard grinding methods.
Removal of striping and pavement markings shall not be performed by using flame or heat methods. Full compensation for removing and disposing of thermoplastic traffic stripes and pavement markings shall be considered as included in the contract price paid for various items of work and no separate payment will be made therefor.
B. Installation of Thermoplastic Traffic Stripes and Pavement Markings shall be per the project drawings, the City of Vallejo Standard Specifications and the Caltrans Standard Specifications.
C. Standard pavement marking for a ‘STOP” shall be per City Standard
PW9408 SECTION D.1900 STRIPING AND SIGNING
D-88
Specifications.
D. The thermoplastic material for traffic stripes and pavement markings shall be applied by extrusion methods only. Thermoplastic material for traffic stripes shall be applied at a minimum thickness of 0.060-inch.
Thermoplastic material for pavement markings shall be applied at a minimum thickness of 0.100- to 0.150-inch.
3.02 ROADSIDE SIGNS
A. Roadside signs shall be installed at locations shown on the drawings per City of Vallejo Standard Specifications Section 3.3.39, City of Vallejo’s Standard Drawings Nos. 7-07 thru 7-12, and per Caltrans Standard Specification Section 56-2, “ROADSIDE SIGNS.”
B. All roadside signs, except as specifically noted on the drawings or in these Technical Specifications, shall be installed using metal pipe posts with braces, if required.
C. Installation of roadside signs on street light poles shall not damage or scratch the paint of the street light. Any damage to the street light pole shall be repaired by the Contractor at his own cost.
D. Any damage to the relocated sign shall be repaired by the Contractor to the satisfaction of the Engineer and all costs of such repair shall be the sole responsibility of the Contractor.
E. All newly installed roadside signs shall be continuously covered from view, as directed by the Engineer, until they are required to control traffic. The Engineer shall direct the Contractor when the new signs are to be uncovered.
F. Existing roadside signs, at locations shown on the drawings to be salvaged, shall be removed and salvaged. Salvaged signs shall be delivered to a City of Vallejo Salvage/Storage Yard.
G. Salvaged roadside signs shall not be removed until replacement signs have been installed or until the existing signs are no longer required for the direction of public traffic, unless otherwise directed by the Engineer.
H. Each multi-post or single post sign with one or more sign panels mounted on the post shall be considered a single unit for measurement and payment purposes.
3.1 REMOVE THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS
PW9408 SECTION D.1900 STRIPING AND SIGNING
D-89
A. Existing pavement thermoplastic traffic stripes and pavement markings, when no longer required for traffic lane delineation as directed by the Engineer and where not removed by other operations, shall be removed prior to placing pavement reinforcing fabric and overlay and shall be disposed of. Such removed material shall be disposed of outside the right of way in accordance with the provisions in Section 7-1.13, Section B General Provisions.
B. Removal of thermoplastic traffic stripes and pavement markings shall be by industry standard grinding methods. Removal of striping and pavement markings shall not be performed by using flame or heat methods.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in striping and signage, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract bid items and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.2300 EARTHWORK
D-90
SECTION D.2300 - EARTHWORK
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Structure excavation shall conform to Section 19-3 of the Caltrans Standard Specifications. This work shall consist of excavation for the construction of foundations for structures; excavation of trenches for storm drain pipe and other facilities; other excavation designated on the drawings or in these technical specifications as structure excavation.
B. Structure backfill shall consist of furnishing, placing and compacting backfill material around structures to the lines and grades designated on the drawings or specified or directed by the Engineer.
PART 2 MATERIALS
2.01 SUBGRADE MATERIAL AND STRUCTURAL BACKFILL
A. Aggregate Base - Aggregate base structural backfill shall conform to Section 02700, “Asphalt Concrete and Aggregate Base”, of these specifications unless otherwise directed.
PART 3 EXECUTION
3.01 SHORING, SHEETING, BRACING
A. Where an excavation for a trench and/or structure is five feet or more the contractor shall conform to OSHA requirements and shall provide a copy of the approved OSHA permit and shoring details and calculations prepared by a structural engineer to the City Engineer.
3.02 EXCAVATION AND BACKFILL FOR STRUCTURES AND STORM DRAIN PIPE
A. General - Excavation and backfill for structures shall consist of excavation for the construction of curb walls, catch basins, manholes, storm drain pipe and sanitary sewer pipe.
B. Excavation - The site shall be cleared of all natural obstructions, pavement, utilities, and other items which will interfere with construction. Unless otherwise specified, any method of excavation may be employed which, in the opinion of the Contractor, is considered best.
Where, in the opinion of the Engineer, the undisturbed condition of the natural soil is not adequate to support the structure, the proposed fill, or
PW9408 SECTION D.2300 EARTHWORK
D-91
other project improvements, the Engineer shall direct the contractor to over excavate to adequate supporting soil and refill the over excavated space as required by the Engineer. The quantity and placement of such material shall be as ordered by the Engineer. Any areas over excavated, which were not directed by the Engineer, will be at the contractor’s sole expense to refill and no additional compensation will be allowed therefor.
Excavation shall extend a sufficient distance from walls, footings and manholes to allow for placing and removal of forms, installation of services, and installation of backfill.
C. Backfilling - After completion of foundation footings and curb walls, and other construction below the elevation of the final grade, all forms shall be removed and the excavation shall be cleaned for all debris.
Backfill material shall be placed in uniform layers and shall be brought up uniformly on all sides of the structure or facility. The thickness of each layer of backfill shall not exceed 0.67-foot before compaction.
Compaction equipment or methods which, may cause excessive displacement or may damage structures, shall not be used.
Structure backfill shall not be placed until the structure footings or other portions of the structure or facility have been inspected by the Engineer and approved for backfilling. No backfill material shall be deposited against the back of concrete curb walls, or the outside walls of cast-in-place concrete structures until the concrete has developed a strength of not less than 3,000 pounds per square inch in compression, or until the concrete has been in place for 28 days, whichever occurs first.
Unless otherwise shown on the drawings or specified in these technical specifications, structure backfill shall be compacted to a relative compaction of not less than 95 percent as determined by ASTM designation D-1557.
All excavated unacceptable soil and material shall be removed from the job site and shall not be incorporated into the project.
D. Trench Excavation
Excavation for storm drain and appurtenant structures shall be made only after the material to be used in the work is delivered to the job site. The City shall have the authority to limit the amount of trench to be opened or left open at any one time. In public street areas, excavation and pipe laying shall be coordinated so that a minimum of interference with public traffic will occur. All work in city streets will be coordinated by the Contractor with the City Traffic Engineer. Where excavation occurs in paved areas at the end
PW9408 SECTION D.2300 EARTHWORK
D-92
of each day, the exposed ends of any storm drain line under construction shall be plugged to keep out any foreign matter, and the trench shall be backfilled to within one inch of finish grade and the remainder filled with cutback. At the option of the contractor plating will be allowed in lieu of complete backfill unless the plating would be deemed a traffic hazard by the Engineer. Plating will have cutback around all sides or as directed.
Where excavation occurs in paved areas, the pavement shall be scored or sawed in a manner acceptable to the City Engineer ahead of the trenching operations. The proper tools or equipment shall be used so that the pavement will be cut accurately and trimmed to neat lines with vertical edges parallel to the trench at the required width. Any pavement damaged outside the trench limits shall be neatly and accurately cut and trimmed and replaced by the Contractor at his own expense.
Prior to starting excavation on the site, contractor shall pothole to verify the location and extent of underground utilities in the work area. Exercise care to protect existing utilities during operations. All trenches and excavations over 5-feet shall be adequately braced, shored and sheeted in a manner to conform with the rules of the California Industrial Accident Commission.
Any damage resulting from the lack of adequate bracing, shoring or sheeting shall be the responsibility of the Contractor.
Trench Width and Shoring - Safety is the Contractor’s responsibility.
Attention is called to the Trench Construction Safety Orders of the California State Industrial Accident Commission, which the contractor is required by law to obey. The piling, lagging timbering, or bracing as may be required.
All lagging, sheet piling, or any other timbering or bracing used in the trench construction shall be removed prior to or during backfilling operations in such manner as not to create any excessive loads on, or movement of the pipe. The minimum trench width shall be eight (8) inches wider than the external diameter of the pipe, and the maximum trench width shall be sixteen (16) inches wider than the external pipe diameter.
Trenches shall be excavated with full depth, vertical sides wherever possible. The minimum vertical trench shall be from the pipe flow line to one (1) foot over the top of the pipe.
E. Unsuitable Material
In advance of placing any storm drain pipe or the construction of any appurtenant structures, existing material which in the opinion of the City is unsuitable as a foundation, including but not limited to organic matter, garbage, and junk piles either on the surface or buried shall be removed and disposed of and the over-excavation backfilled and compacted to the required grade. In rock, or a mixture of rock and soil excavations, such
PW9408 SECTION D.2300 EARTHWORK
D-93
material shall be excavated six (6) inches below the bottom of the pipe and the over excavation shall be filled to proper grade with properly compacted bedding material.
F. Line and Grade Stakes - Line and grade stakes conforming to the drawings and profile will be set by the City on an offset line parallel to the centerline of the sanitary or storm sewer to be constructed. These lines and stakes shall be carefully maintained by the Contractor in place until that portion of the work for which the line and stakes were set has been completed, inspected, and approved, and if disturbed or destroyed through negligence or carelessness of the Contractor, the lines and stakes shall be replaced at the expense of the Contractor. Recovery of stakes covered by construction dirt or debris shall be considered as being replaced. The cost of replacing stakes shall be $100.00 for each stake replaced or recovered. Payment shall be deducted from the monthly progress payments.
The Contractor shall notify the Engineer, in writing, at least five (5) working days in advance of the time that the lines and stakes along any portion of said line must be ready for use.
G. Trench Backfill
Trench backfill shall conform to Section 2750 of these specifications.
3.03 ROADWAY EXCAVATION
A. Roadway excavation shall conform to Section 19-1, "General" and Section 19-2, "Roadway Excavation" of the Caltrans Standard Specifications, except the reference to Section 19-5, "Compaction," is deleted, and except that Section 19-2.02, "Unsuitable Material," is modified as follows:
1. When directed by the ENGINEER, the CONTRACTOR shall excavate the unstable or unsuitable underlying material to the depth determined by the Engineer.
2. Subgrade shall be prepared in conformance with PART 3 - EXECUTION, of Section 02700, "Asphalt Pavement, Base and Surface Treatments."
3.04 ROADWAY GRADING AND COMPACTION
A. Roadway grading shall consist of grading the site to the lines and grades called for on the Drawings. Roadway grading, placing and compacting shall conform to Section 19-5, "Compaction" and Section 19-6, "Embankment Construction," of the Caltrans Standard Specifications and as modified by
PW9408 SECTION D.2300 EARTHWORK
D-94
this Section.
B. Damage to underlying native soils caused by the CONTRACTOR'S operations shall be repaired and re-compacted under the supervision of and to the satisfaction of the ENGINEER at no additional cost to the CITY.
C. Material for roadway fill shall be placed in lifts or horizontal layers not exceeding 8 inches in un-compacted thickness. Unless otherwise specified, material shall be moisture conditioned by wetting or drying as specified in Section 3.2 above, and compacted to a density of not less than 90 percent relative compaction in conformance with ASTM D 1557. In addition, in fill areas the upper 2 feet below street subgrade for the width of the traveled way shall be compacted to a density of not less than 95 percent relative compaction in conformance with ASTM D 1557.
D. Final preparation of subgrade shall be in conformance with PART 3 - EXECUTION of Section 02700, "Asphalt Pavement, Base and Surface Treatments."
3.05 UNDERGROUND STRUCTURES
A. Where abandoned underground structures and pipelines are encountered in the street areas, remove to sufficient depth to allow underground lines to cross, backfill and compact during rough grading. The ENGINEER may require further work to be done if visual inspection indicates during construction.
3.06 EXPORT CLASS 1 HAZARDOUS SOIL
A. Where Class 1 hazardous soil is encountered on the project and is determined by City to be Class 1 soil, Contractor will export Class 1 hazardous soil to an approved Class 1 Landfill. Contractor to provide a manifest from the landfill for the soil delivered.
PART 1 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Full compensation for excavation and backfill shall be considered as included in the prices paid for the various contract bid items and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-95
SECTION D.2315 - UTILITY EARTHWORK
PART 1 GENERAL
1.01 SCOPE OF WORK
A. The CONTRACTOR shall provide all materials, equipment, and labor necessary to perform and complete all utility earthwork as shown on the Drawings and as specified herein.
B. The work of this Section includes all earthwork required for construction of the project. Such earthwork shall include, but may not necessarily be limited to, the loosening, removing, loading, transporting, depositing, and compacting in its final location of all materials wet and dry, as required for the purposes of completing the work, which shall include, but not necessarily be limited to, the furnishing, placing, and removing of sheeting, shoring and bracing necessary to safely support the sides of all excavations; all pumping, ditching, draining and other required measures for the removal or exclusion of water from the excavation; the supporting of structures above and below the ground; all backfilling around structures and all backfilling of trenches and pits; the disposal of excess excavated materials; borrow of materials to make up deficiencies for fills; and all other incidental earthwork.
C. Hazardous materials shall be handled in accordance with all regulatory agency requirements.
1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. State Codes:
1. California Labor Code.
2. Construction Safety Orders of the State of California.
B. State of California (Caltrans) Standards:
1. Standard Specifications:
a. Section 25 Aggregate Subbases
b. Section 26 Aggregate Bases
c. Section 68 Surface Drains. Subsurface Drains.
d. Section 88 Engineering Fabrics
1.03 CONTRACTOR SUBMITTALS
A. The CONTRACTOR'S attention is directed to the provisions for "Shoring
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-96
and Bracing Drawings" in Section 6705 of the California Labor Code. The CONTRACTOR, prior to beginning any trench or structure excavation 5 feet deep or over, shall submit to the ENGINEER for review for compliance with Section 6705 the CONTRACTOR'S detailed plan showing design of all shoring, bracing, sloping of the sides of excavation, or other provisions for worker protection against the hazard of caving ground during the excavation of such trenches or structure excavation. If such plan varies from the shoring system standards established in the Construction Safety Orders of the State of California, such alternative system plans shall be prepared, stamped and signed by a civil or structural engineer licensed in the State of California at the CONTRACTOR’S expense.
B. Certificates of Compliance: Certificates of Compliance shall be provided for all products and materials proposed to be used under this Section.
C. For all materials that are not pre-approved by the CITY the CONTRACTOR shall designate the source and/or submit samples of all materials in advance of their use for required testing and ENGINEER’s approval. All testing costs shall be at the CONTRACTOR’S expense.
1.04 QUALITY ASSURANCE
A. General: All soils testing will be done by a testing laboratory of the CITY'S choice at the CITY'S expense except as otherwise specified in Paragraph
1.5 C. below.
B. Where soil material is required to be compacted to a percentage of maximum density the maximum density at optimum moisture content will be determined in accordance with ASTM D 1557. Field density in-place tests will be performed in accordance with ASTM D 6938, or by such other means acceptable to the ENGINEER.
C. In case the first test and one re-test of the fill or backfill show non- compliance with the requirements the CONTRACTOR shall accomplish such remedy as may be required to insure compliance. Subsequent re- testing after the first re-test to show compliance shall be at the CONTRACTOR'S expense.
D. The CONTRACTOR shall notify the ENGINEER at least 48 hours prior to performing any utility excavation.
PART 2 PRODUCTS
2.01 SUITABLE BACKFILL MATERIALS
A. Suitable Backfill shall be a selected or processed clean, fine earth, rock, or PW9408 SECTION D.2315 UTILITY EARTHWORK
D-97
sand, free from objectionable material, vegetation, or other deleterious substances.
B. The following TYPES of backfill materials are designated and defined as follows:
1. TYPE 1 - Sand shall be material with 100 percent passing a 3/8-inch sieve, at least 90 percent passing a No. 4 sieve, and a sand equivalent value not less than 30.
2. TYPE 2 - Class 2 Aggregate Base shall be crushed rock aggregate base material meeting the requirements of Section 26, “Aggregate Bases,” for 3/4” maximum grading, of the Caltrans Standard Specifications.
3. TYPE 3 - Type 1 Bedding shall meet all of the quality requirements of section 26-1.02B of the Standard Specifications for class 2 Aggregate Base and shall have the following grading.
US Std Sieve % Passing
5/4” 100%
3/4” 5%
4. TYPE 4 - Not Used.
5. TYPE 5 - Not Used.
6. TYPE 6 - Not Used
7. TYPE 7 - Native material shall be material obtained from on-site excavations, provided the materials are not classified as unsuitable.
Native material shall be free of stones, Organic matles, rubbish debris, lumps, broken concrete or bituminous surfacing over 3 inches in diameter, objectionable material, vegetation, and deleterious substances.
8. TYPE 8 - Provide import topsoil as required to complete landscape work.
Topsoil to be furnished shall be fertile and friable, possessing characteristics of representative productive soils on the site. It shall not contain toxic substances which may be harmful to plant growth. If herbicide contamination is suspected then a radish/rye grass growth trial must be performed. Consult with City’s Representative prior to decision to test. It shall be uniformly textured and free of all objectionable foreign materials, oil, or chemicals, which may be injurious to plant growth.
Natural topsoil shall possess a pH factor between 5.5 and 7.5, a sodium adsorption ratio (SAR) of less than 8, a boron concentration of the saturation extract of less than 1 ppm, and salinity of the saturation extract at 25 degrees C. of less than 4.0 milliohms per centimeter. Imported PW9408 SECTION D.2315 UTILITY EARTHWORK
D-98
topsoil shall be tested by an approved soils laboratory for compatibility with existing on-site soils and fertility. Contractor shall submit soil laboratory’s analysis and amendment recommendations. Top soil shall be amended per recommendations from testing facility. Imported topsoil shall be subject to inspection by City’s Representative at the project site.
Remove rejected topsoil immediately at Contractor's expense.
9. TYPE 9 - Aggregate Subbase shall conform to the grading and quality requirements of Section 25, “Class 2 Aggregate Subbase” of the Caltrans Standard Specifications.
2.02 UNSUITABLE BACKFILL MATERIAL
A. Unsuitable soils for backfill material shall include soils which, when classified under ASTM D 2487, fall in the classifications of Pt, OH, or OL.
Types CH and MH soils will be permitted in unimproved areas only where required compaction and stability can be demonstrated. In addition, any soil which cannot be compacted sufficiently to achieve the percentage of maximum density specified for the intended use, shall be classified as unsuitable material.
B. Any material determined to be hazardous is defined as unsuitable material.
C. Washed, smooth rock (pea gravel) is classified as unsuitable material.
D. Where moisture content of the material is not in conformance with Section 02300, "Earthwork," the material will be classified as unsuitable material.
2.03 USE OF SUITABLE BACKFILL MATERIAL TYPES
A. The CONTRACTOR shall use the types of materials as designated herein for all required backfill construction.
B. Backfill material types shall be used in conformance with the following provisions:
C. Bedding backfill, as defined under PART 3 - EXECUTION of this Section herein, shall be Sand; Class 2 Aggregate Base; Type 1 Bedding, meeting the requirements of Product Types 1, 2 or 3.
D. When water is encountered in the trench, pipes shall be laid over a minimum of six (6) inches of Type I bedding meeting the products requirements of Type 3. The trench shall be kept dry until placing of bedding, material applying and jointing the pipe have been completed, inspected and approved.
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-99
E. When construction takes place in a dry trench and above the ground water table, a minimum of six (6) inches of class 2 aggregate base bedding meeting the product requirements of Type 2 shall be provided below the pipe.
F. Bedding shall be true to grade and thoroughly compacted by tamping to minimum relative density of 90% as determined by ASTM designation D- 1557 before the pipe is laid.
G. Bedding for Ductile Iron Pipe shall be Sand meeting the requirements of Product Type 1.
1. Pipe Zone backfill, exclusive of bedding, as defined under PART 3 - EXECUTION of this Section herein, shall be as follows:
a. Ductile Iron Pipe shall be backfilled with Sand meeting the requirements of Product Type 1.
b. Plastic pipe, Vitrified Clay Pipe and concrete pipe shall be backfilled with Sand; Class 2 Aggregate Base backfill material; Crushed Rock or Gravel, meeting the requirements of Product Type 2.
Note: Where pipelines are installed on grades exceeding 4 percent, and where backfill materials are graded such that there is less than 10 percent passing a No. 4 sieve, trench plugs of impermeable clay type material or concrete shall be provided at minimum intervals of 200 feet.
2. Trench Zone backfill as defined under PART 3 - EXECUTION of this Section herein, shall be Class 2 Aggregate Base; Native; or Aggregate Subbase meeting the requirements of Product Types 2.
3. Final Zone backfill as defined under PART 3 - EXECUTION of this Section herein, shall consist of the following materials for each condition listed below.
a. Final Zone backfill under paved areas shall be Class 2 Aggregate Base, CLSM, or Class 2 Aggregate Subbase, meeting the
requirements of Product Types 2, 6, or 9.
b. Final Zone Backfill in unimproved areas shall be Native or Class 2 Aggregate Subbase meeting the requirements of Product Types 7 or
9. c. Final Zone backfill in landscape areas shall be Native meeting the requirements of Product Type 7. Topsoil and amendments shall be Product Type 8 as specified in Section 02911, "Landscape Soil PW9408 SECTION D.2315 UTILITY EARTHWORK
D-100
Preparation," and as shown on the Drawings.
d. Final Zone backfill under graveled roads shall be Class 2 Aggregate Base, CLSM, Native, or Class 2 Aggregate Subbase meeting the requirements of Product Types 2, 6, 7, or 9.
4. Minor structures. Backfill materials around and below minor structures shall be cleaned and washed ¾” x ½” angular crushed rock.
5. Over-excavation backfill shall be Class 2 Aggregate Base meeting the requirements of Product Type 3. For wet trench conditions place a filter fabric on top and below of the permeable material to prevent migration of fines.
2.04 STEEL PLATE
A. When steel plate bridging is provided in-lieu of backfill and temporary asphalt, it shall conform to Section 602.1 of the Caltrans Encroachment Permit Manual, with the following minimum thicknesses:
Trench Width Minimum Plate Thickness
(10") 0.25 m (1/2”) 13 mm
(1' - 11") 0.58 m (3/4”) 19 mm
(2' - 7") 0.80 m (7/8”) 22 mm
(3' - 5") 1.04 m (1”) 25 mm
(5' - 3") 1.60 m (1 ¼”) 32 mm
B. For spans greater than 5 feet-3 inches, a structural design shall be prepared by a California registered civil engineer.
PART 3 EXECUTION
3.01 GENERAL
A. Where abandoned underground structures are encountered in the street areas, remove to sufficient depth to allow underground lines to cross, backfill and compact during rough grading. The ENGINEER may require further work to be done if visual inspection indicates during construction.
3.02 MINOR STRUCTURE EXCAVATION
A. General: Except when specifically provided to the contrary, excavation shall include the removal of all materials of whatever nature encountered, including all obstructions of any nature that would interfere with the proper execution and completion of the work. The removal of said materials shall
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-101
conform to the lines and grades shown on the Drawings or ordered by the ENGINEER. Prior to commencing work by the contractor, the contractor shall furnish a cutsheet giving the layout and the elevation of the work with respect to said line and grade stakes. Unless otherwise provided, the entire construction site shall be stripped of all vegetation and debris, and such material shall be removed from the site prior to performing any excavation or placing any fill. The CONTRACTOR shall furnish, place, and maintain all supports and shoring that may be required for the sides of the excavations, and all pumping, ditching, or other measures required for the removal or exclusion of water, including storm water, groundwater, and wastewater reaching the site of the work from any source so as to prevent damage to the work or adjoining property. Excavations shall be sloped or otherwise supported in a safe manner in accordance with applicable State safety requirements and the requirements of OSHA Safety and Health Standards for Construction (29CFR1926). The limits of structure excavation shall be a minimum of 16 inches beyond the outside edge of the structure, and at a minimum no larger than necessary to facilitate backfill, compaction and testing operations. For structures poured against undisturbed soil the width of the structure wall shall be no more than 2 inches greater than specified or shown on the Drawings.
B. Excavation Beneath Minor Structures: Except where otherwise specified for a particular structure or as directed by the ENGINEER, excavation shall be carried to the grade of the bottom of the structure. When directed by the ENGINEER, areas beneath minor structures shall be over-excavated.
When such over-excavation is directed, both over-excavation and subsequent backfill to the required grade shall be performed. After over- excavation is performed and before backfill is placed, the exposed surface shall be scarified to a depth of 6 inches, brought to optimum moisture content, and rolled with heavy compaction equipment to obtain 90 percent of maximum density.
3.03 PIPELINE AND UTILITY TRENCH EXCAVATION
A. Trench Width: Unless otherwise shown or directed, excavation for pipelines and utilities shall be open-cut trenches. Trench widths shall be kept as narrow as is practical for the method of densification selected by the CONTRACTOR, but shall have a minimum width at the bottom of the trench equal to the outside diameter of the pipe plus 16 inches maximum. The minimum width at the top of the pipe shall be equal to the outside diameter of the pipe plus 12 inches for pipe diameters 8 inches and larger, and for pipe diameters less than 8 inches minimum trench width shall be not less than 18 inches in width. For deep trenches, the maximum width requirement may be waived for constructability reasons with the written approval of the ENGINEER. For telecommunications conduits (electrical, telephone, cable TV/communication conduits), street light and traffic signal
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-102
conduits, the width of the trench shall be as shown on the City standard details.
B. Subgrade: The surface of the subgrade after compaction shall be hard, uniform, smooth, self-draining, and true to grade and cross section.
C. Trench Bottom: The pipe bedding shall be given a final trim establishing grade such that each pipe section when first laid will be continually in contact with the bedding along the extreme bottom of the pipe. Rounding out the trench bottom or bedding to form a cradle for the pipe will not be allowed. The CONTRACTOR shall excavate for bell holes and fittings.
D. Open Trench: The maximum amount of open trench permitted in any one location shall be the length necessary to accommodate the amount of pipe installed and backfilled in a single day. All trenches shall be fully backfilled at the end of each day or, in lieu thereof, shall be covered by heavy steel plates adequately braced and capable of supporting vehicular traffic in those locations where it is impractical to backfill at the end of each day. The above requirements for backfilling or use of steel plate may be waived in cases where the trench is located further than 100 feet from any travelled roadway or occupied structure. In such cases, however, barricades and warning lights meeting safety requirements shall be provided and maintained.
E. Trench Over-Excavation: Where indicated trenches shall be excavated to the depth shown, and then backfilled to the grade of the bottom of the Pipe Zone.
F. Over-Excavation: When ordered by the ENGINEER, whether or not indicated on the Drawings, trenches shall be over-excavated beyond the depth shown. Such over-excavation shall be to the depth ordered. The trench shall then be backfilled to the grade of the bottom of the Pipe Zone.
G. Where pipelines are to be installed in embankment or structure fills, the fill shall be constructed to a level a minimum of 2 feet above the top of the pipe, as directed by the ENGINEER, or as recommended by the pipe manufacturer, whichever is greater, before the trench is excavated.
3.04 OVER-EXCAVATION NOT ORDERED, SPECIFIED, OR SHOWN
A. Any over-excavation carried below the grade ordered, specified, or shown, shall be backfilled to the required grade and densified with the specified material and compaction. Such work shall be performed by the CONTRACTOR at its own expense.
3.05 EXCAVATION IN VICINITY OF TREES
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-103
A. Except where trees are shown to be removed, trees shall be protected from injury during construction operations. No tree roots over 2 inches in diameter shall be cut without express permission of the ENGINEER. Trees shall be supported during excavation by any means previously reviewed by the ENGINEER.
B. If existing roots over one inch in diameter are cut during the course of the work, the cut faces shall be thoroughly coated with emulsified asphalt made especially for use on cut or damaged plant tissues. Exposed roots shall be covered with wet burlap to prevent them from drying out.
3.06 ROCK EXCAVATION
A. Rock excavation shall include removal and disposal of the following: (1) all boulders measuring 1/3 of a cubic yard or more in volume; (2) all rock material in ledges, bedding deposits, and unstratified masses; (3) concrete or masonry structures which have been abandoned; and (4) conglomerate deposits which are so firmly cemented that they possess the characteristics of solid rock.
B. Explosives and Blasting: Use of Explosives and Blasting will not be permitted.
3.07 DISPOSAL OF EXCESS EXCAVATED MATERIAL
A. The CONTRACTOR shall remove and dispose of all excess excavated material to a suitable site. The proper and legal disposal shall be the responsibility of the CONTRACTOR.
3.08 BACKFILL - GENERAL
A. Backfill shall not be dropped directly upon any structure or pipe. Backfill shall not be placed around or upon any structure for a minimum of 72 hours or until the concrete has attained sufficient design strength to withstand the loads imposed, whichever is greater.
B. Backfill shall not be placed until after all water is removed from the excavation.
3.09 PIPE AND UTILITY TRENCH ZONES AND BACKFILL
A. Pipe Zone and Backfill (Initial Backfill) :
1. The Pipe Zone is defined as that portion of the vertical trench cross- section lying between a plane 6 inches below the bottom surface of the
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-104
pipe, i.e., the trench subgrade, and a plane at a point 12 inches above the top surface of the pipe.
2. The Pipe Zone shall be backfilled with the specified backfill material. The CONTRACTOR shall exercise care to prevent damage to the pipeline coating, cathodic bonds, or the pipe itself during the installation and backfill operations.
B. Bedding: The bedding is defined as that portion of the Pipe Zone lying between a plane 6 inches below the bottom surface of the pipe, the trench subgrade, and a level line from the bottom of the pipe.
1. Bedding shall be provided for all pipelines.
2. After compacting the bedding the CONTRACTOR shall perform a final trim for establishing grade, such that each pipe section when first laid will be continually in contact with the bedding along the extreme bottom of the pipe.
C. Trench Zone and Backfill (Subsequent Backfill) : After the Pipe Zone backfill has been placed as specified above, and after all excess water has completely drained from the trench, backfilling of the Trench Zone may proceed.
1. The Trench Zone is defined as that portion of the vertical trench cross- section lying between a plane 12 inches above the top surface of the pipe and a plane at a point 30 inches below the roadway subgrade in paved areas, or 30 inches below the finished surface grade in landscaped or unimproved areas.
D. Final Zone and Backfill: The Final Zone is defined as the last 30 inches between the top of the Trench Zone and the roadway subgrade in paved areas, and the last 30 inches of the vertical trench cross-section lying between the top of the Trench Zone and the finish final grade in landscaped or unimproved areas.
E. Utility Crossing: For any new pipeline installation that crosses under an existing electric, gas, telephone, or cable tv utility pipe(s) or conduit(s) the CONTRACTOR shall replace the existing backfill material around the existing utility pipe(s) or conduit(s) with PG&E SAND.
1. PG&E SAND shall be placed from a plane 6 inches below the bottom of the lowest utility pipe or conduit to a plane 12 inches above the top of the highest utility pipe or conduit, and for the full width of the new trench.
PG&E SAND backfill shall be compacted to 95 percent maximum density in conformance with COMPACTION AND BACKFILL MATERIALS as PW9408 SECTION D.2315 UTILITY EARTHWORK
D-105
specified below.
3.10 PLACING AND SPREADING OF BACKFILL MATERIALS
A. Backfill materials shall be placed and spread evenly in horizontal layers.
The backfill layers shall be evenly spread so that when each layer compacted shall not exceed 6 inches in thickness.
B. During spreading each layer shall be thoroughly mixed as necessary to promote uniformity of material in each layer and uniformity of moisture throughout backfill materials. Pipe Zone backfill materials shall be manually spread around the pipe so that when the Pipe Zone backfill compacted will provide uniform bearing and side support.
C. Where the backfill material moisture content is below the optimum moisture content water shall be added before or during spreading until the proper moisture content is achieved.
D. Where the backfill material moisture content is too high to permit the specified degree of compaction, the material shall be dried or replaced until the moisture content is satisfactory.
E. Backfill shall be mechanically compacted by means of tamping rollers, sheepsfoot rollers, pneumatic tire roller, vibrating rollers, or other mechanical tampers. All such equipment shall be of a size and type subject to review by the ENGINEER. Impact-type pavement breakers (stompers) will not be permitted. Permission to use specific compaction equipment shall not be construed as guaranteeing or implying that the use of such equipment will not result in damage to adjacent ground, existing improvements, or new improvements. The CONTRACTOR shall make its own determination in this regard.
F. Material for mechanically compacted backfill may be placed in loose lifts which, prior to compaction, shall not exceed the thickness specified below for various types of equipment:
1. Vibratory equipment, including vibratory plates, vibratory smooth-wheel rollers, and vibratory pneumatic-tired rollers - maximum lift thickness of 2 feet.
2. Rolling equipment, including sheepsfoot (both vibratory and non- vibratory), grid, smooth-wheel (non-vibratory), pneumatic-tired (non- vibratory), and segmented wheels - maximum lift thickness of 1 foot.
3. Hand-directed mechanical tampers-maximum lift thickness of 4 inches.
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-106
G. Mechanically compacted landfill shall be placed in horizontal layers of thickness not exceeding those specified above, compatible to the material being placed and the type of equipment being used. Each layer shall be evenly spread, moistened or dried, if necessary, and then tamped or rolled until the specified relative compaction has been attained.
3.11 COMPACTION OF BACKFILL MATERIALS
A. Each layer of backfill material as defined herein, shall be mechanically compacted to the specified percentage of maximum density. Equipment that is consistently capable of achieving the required degree of compaction shall be used and each layer shall be compacted over its entire area while the material is at the required moisture content range.
B. Flooding, ponding, or jetting shall not be used.
C. Equipment weighing more than 10,000 pounds shall not be used closer to structure walls than a horizontal distance equal to the depth of the fill against the structure wall at that time. Hand operated power compaction equipment shall be used where use of heavier equipment is impractical or restricted due to weight limitations.
D. Compaction Requirements: The following compaction test requirements shall be in accordance with ASTM D 1557 for cohesive type materials and in accordance with ASTM D 4253 and D 4254 for “non-plastic” cohesionless free draining granular type materials. Where other agency or utility company requirements govern, the highest compaction standards shall apply.
Percentage of Location or Use of
Fill
Percentage of
Maximum Density
Relative Density
Pipe Zone backfill including
bedding and overexcavated zone 90 65
Final Zone backfill beneath paved
areas or structures 95 70
Final Zone backfill beneath
unpaved access areas, landscape,
or unimproved areas.
90 55
Trench Zone backfill 90 65
Backfill beneath minor structures 90 70
Backfill around minor structures 90 65
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-107
Maximum Density refers to maximum dry density according to ASTM D 1557 laboratory test procedures. Percentage of Relative Density refers to ASTM D 4253 and ASTM D 4254 laboratory test procedures. Relative density should only be used for "non-plastic" cohesionless free draining, granular-type materials.
E. Trench Backfill Requirements: The pipe class has been structurally designed based upon the trench configuration previously specified herein.
1. The CONTRACTOR shall maintain the previously specified trench width up to a horizontal plane lying 12 inches above the top of the pipe.
2. If, at any location under said horizontal plane, the CONTRACTOR slopes the trench walls or exceeds the maximum trench widths indicated the Pipe Zone backfill shall be "improved" or the pipe class improved at no additional cost to the CITY. "Improved" backfill shall mean Control Low Strength Materials or other equivalent materials acceptable to the ENGINEER.
3. If the allowable deflection specified for the pipe is exceeded, the CONTRACTOR shall expose and reround or replace the pipe, repair all damaged lining and coating, and reinstall the Pipe Zone material and Trench Zone backfill as specified.
4. All trenches shall have a minimum of 2 inches of temporary asphalt placed daily and maintained unless final paving can be completed in the same day. Temporary asphalt shall be placed flush with adjacent pavement grade.
F. Steel plates may be used to cover open trenches in-lieu of backfill and temporary asphalt pavement.
3.12 STEEL PLATE
A. General: When backfilling operations of an excavation in the traveled way, whether transverse or longitudinal, cannot be properly completed within a work day, steel plate bridging with a non-skid surface and shoring may be required to preserve unobstructed traffic flow.
B. When steel plate bridging is required, the following conditions shall apply:
1. Steel plates used for bridging must extend a minimum of 12 inches beyond the edges of the trench.
2. Steel plate bridging shall be installed to operate with minimum noise.
PW9408 SECTION D.2315 UTILITY EARTHWORK
D-108
3. The trench shall be adequately shored to support the bridging and traffic loads.
4. Temporary paving with cold asphalt concrete shall be used to feather the edges of the plates, if plate installation by Method (2) is used.
5. Bridging shall be secured against displacement by using adjustable cleats, shims or other devices.
C. Steel plate bridging and shoring shall be installed using either Method (1) or (2):
1. Method 1 For speeds more than 45 mph:
a. The pavement shall be cold planed to a depth equal of the thickness of the plate and to a width and length equal to the dimensions of the plate.
2. Method 2 For speeds 45 mph or less:
D. Approaching plate(s) and ending plate (if longitudinal placement) shall be attached to the roadway by a minimum of 2 dowels pre-drilled into the corners of the plate and drilled 2 inches into the pavement. Subsequent plates are butted to each other. Fine graded asphalt concrete shall be compacted to form ramps, maximum slope 8.5 percent with a minimum 12 inch taper to cover all edges of the steel plates. When steel plates are removed, the dowel holes in the pavement shall be backfilled with either graded fines of asphalt concrete mix, concrete slurry or an equivalent slurry.
E. Steel plate bridging should not exceed 4 consecutive working days in any given week.
PART 4 MEASUREMENT AND PAYMENT
F. Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in utility earthwork, as shown on the drawings, as specified in the Standard Specifications and these technical specifications, and as directed by the Engineer shall be included in the prices paid for the various contract bid items and no additional compensation will be allowed therefor.
END OF SECTION
PW9408 APPENDIX
D-109
SECTION B: TECHNICAL SPECIFICATIONS
APPENDIX A
Location Map
Vicinity Map
Site Assessments
SHEET 1
SHEET 2 to 3
SHEET 4 to 15
SHEET 16 to 21
Vallejo Standard Plans
LOCATION MAPCHECKED SCALEDATE REF.DRAWN BY FILE NO.DWG. NO. SHEETOF--BAW--1 1-_1" = 4000'PUBLIC WORKS DEPARTMENTENGINEERING DIVISIONVALLEJO CITY-FLET ELECTRIC VEHICLE CHARGING STATIONS PROJECT California
Northern
M
onterey
St
Hudson Aly
Indian Aly
Georgia St Georgia St
M
onterey
St
Maine St Maine St
Garford Aly
Colusa
St
York St
California
Northern
G
lenn
St
Indian Aly
Hudson Aly
Georgia St Georgia St
Am
ador
St
Am
ador
St
Authorized
Bicycle Shop
Maine St
ChaseSt
York St
Solano AveAm
ador
St
Indian Aly
Hudson Aly
Georgia St
Solano Ave
Corp Yard
Esri Community Maps Contributors, County of Solano, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc., METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Maxar
2019_Interconnect_Location_Map
Signals
City Owned Signals
Fiber Box Outlines
Fiber Ducts
Fiber Intersection Dtls
City Limit
Parcel (Oct 2021)
VFWD Boundary
VFWD Storm Lines
VFWD Storm Nodes
VFWD Sewer Mains Private
VFWD Sewer Nodes Private
VFWD Sewer Mains
VFWD Sewer Nodes
2/8/2022, 10:28:15 AM 0 0.03 0.060.01 mi
0 0.04 0.090.02 km
1:2,257
www.VallejoGIS.com
Disclaimer: This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.
Persimmon Dr
Phoenix
Cir
Persimmon Dr
FlemingHill Rd
Tuolumne St
Fleming Hill Rd
Luann
Ct
Water Department
Esri Community Maps Contributors, County of Solano, California State Parks, © OpenStreetMap, Microsoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc., METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, Maxar
City Limit
Parcel (Oct 2021)
VFWD Boundary
VFWD Storm Lines
VFWD Storm Nodes
VFWD Sewer Mains Private
VFWD Sewer Nodes Private
VFWD Sewer Mains
VFWD Sewer Nodes
Water Facilities
Transmission Main
Potable
Raw
Distribution Main
Abandon
Potable
Service Lateral
System Valve
Gate
Storage
2/8/2022, 10:35:54 AM 0 0.03 0.060.01 mi
0 0.04 0.090.02 km
1:2,257
www.VallejoGIS.com
Disclaimer: This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.
City of Vallejo - City Fleet Yard
MCEv Charge Program
Technical Assistance - Site Assessment
John Kalb, EV Charging Pros
June 14, 2020
Vallejo City Yard
Overview
• 111 Amador St, Vallejo CA, 94590
• Mark Helmbrecht, Transportation Superintendent 707 645-2601 [email protected] • Requested 10 Networked L2 ports ports.
Power
• Location 1 requires a new 200A-400A panel to support proposed charging. Electrical capacity is available from main switchgear. • Location 2 requires new PG&E service drop.
Parking
• Location 1 for 10 ports is appropriate for fleet assigned vehicle charging, no accessibility requirements. • Location 2 for 10 ports is appropriate for fleet assigned vehicle charging, no accessibility requirements.
Vendor
• City already has installed ChargePoint stations. New ports may require PowerSharing module.
Videos
• Main Switch and Proposed Location #1 - https://youtu.be/v4sHxUY0oew • Proposed Location #1 - https://youtu.be/7IQeKIzcgwY
• Proposed Location #2 - https://youtu.be/wgQuooVrSeM
Property Map
Existing Power & Panels
Phase 1 Proposed EV Port Location
Phase 2 Proposed EV Port Location
City Yard Electrical
• 600A 240/208/120V 3 Phase 4 wire.• City Yard Service Meter • City Staff measured load on
the existing 3P switchgear.
• A = 68a, B = 87a, C = 67a -
all less than 100a.
• A new 200A-400A panel can
be configured and
dedicated to EV charging
ports.
Proposed Location #1
• 5 dual stations with 10 charging ports can be installed along the back fence of the yard for assigned fleet vehicle charging. • Fleet vehicles assigned to a specific charger are exempt from accessibility requirements, no public charging.
• Pedestal mounted dual charging port can be
installed easily behind existing spaces.
• Location is 30 feet across aisle from main
electrical service, will require trenching.
X
X
X
X
X
City of Vallejo – Water Plant
MCEv Charge Program
Technical Assistance - Site Assessment
John Kalb, EV Charging Pros
June 14, 2020
City of Vallejo Water Plant
Overview
• 202 Fleming Hill Road, Valencia CA
• Mark Helmbrecht, Transportation Superintendent 707 645-2601 [email protected] • Requested 6 Networked L2 ports.
Power
• Water Plant is a Critical City Service.
• Site is maxed out on electrical capacity and hesitant to add load to existing infrastructure. • Main Switch location is ¼ mile down the hill, not possible to add power or panels from that location. • One 30A breaker installed on a 100A panel for single Clipper Creek charging port, unsure is it is actually dedicated load. • Panel is wired for one additional port. Doubt dedicated load is available to support additional charging port(s). • Existing conduit full from panel room to Jbox . However, if electrical capacity is available, no issues getting wire from Jbox to port. • Possible to do a load study, however results may only verify visual inspection and facility manager expectations, no capacity. • Best solution is new PG&E 400A Service drop to support 10-20 charging ports in spaces closer to the main gate.
Port Location
• Employee parking very tight. Do not want to give up parking for charging spaces. • Potential to remove existing Clipper Creek port and install 1 dual station with PowerShare farther along existing row. • Potential to relocate visitor parking and convert to charging spaces as Jbox is 15ft from the location.
Property Map
Main Switch
Room
Existing Clipper Creek Port
Location for 4 ports
Existing Subpanels
Possible Future
Location(s) with New
PG&E Service
Main Subpanel
• 100A 3 P 4W.
• 4-6 spare breaker spaces.
• Some critical loads on panel.
• 30A breaker for Clipper Creek charger.
• Unlikely there is additional capacity on panel for
80A dedicated EV load required for 4
ChargePoint PowerShareports.
Existing Locaiton
• Wiring from Panel under road, through
2 inch conduit to Jbox.
• 1 Inch conduit to Clipper Creek port.
New Location 1
• If replacing the Clipper Creek port
recommend to move beyond Directors
parking and post to these spaces 4
spots away.
• Would require some landscaping to
create flat position for concrete pad
and charging station.
New Location 2
• If electrical capacity is available these
visitors spaces could be converted to
charging spaces as Jbox is only 15 ft
away.
LOCATION MAPCHECKED SCALEDATE REF.DRAWN BY FILE NO.DWG. NO. SHEETOF--BAW--1 1-_1" = 4000'PUBLIC WORKS DEPARTMENTENGINEERING DIVISIONVALLEJO CITY-FLET ELECTRIC VEHICLE CHARGING STATIONS PROJECT
Consent Calendar
8.H.
DATE: October 24, 2023
TO: Mayor and Members of the City Council
FROM: Michael Nimon, Economic Development Director
Erin Hanford, Economic Development Program Manager
SUBJECT: ADOPT A RESOLUTION APPROVING A DESIGN PROFESSIONAL SERVICES AGREEMENT WITH GARAVAGLIA ARCHITECTURE, INC. FOR ARCHITECTURAL DESIGN SERVICES IN THE AMOUNT OF $222,745.00 PLUS CONTINGENCY FOR THE
NAVAL CHAPEL / QUARTERS A IMPROVEMENT PROJECT AND AUTHORIZING THE
CITY MANAGER TO EXECUTE SAME
RECOMMENDATION
Adopt a resolution approving a Design Professional Services Agreement with Garavaglia Architecture, Inc. for architectural design services in the amount of $222,745.00 plus a 15% contingency for the Naval Chapel / Quarters A Improvement Project (Project No. PW9442) and authorizing the City Manager to execute same.
REASONS FOR RECOMMENDATION
Staff advertised a Request for Proposals to provide architectural design services for improvements to the Naval Chapel (St. Peter’s Chapel) and Quarters A (Admiral’s Mansion) on Mare Island. Staff recommends approving a Consultant and Professional Services Agreement with Garavaglia Architecture, Inc.
BACKGROUND AND DISCUSSION
The Mare Island Facilities Major Maintenance, Project No. PW9442, an annual project, was approved by the City Council when it approved the Capital Improvement Program for FY 2023-2024 on June 13, 2023. Once a project is defined, it is renamed. Hence, this fiscal year’s project is named the Naval Chapel / Quarters A Improvement Project.
On July 24, 2023, a Request for Proposals was advertised for thirty days for architectural design services to provide preliminary plans, construction documents, cost estimates, and a schedule for improvements to the Naval Chapel and Quarters A on Mare Island.
The proposed improvements include:
Phase 1
• Naval Chapel
1. Construct a stand-alone restroom facility with supporting utilities (electric, sanitary sewer and water), associated ADA path of travel, and landscaping and irrigation improvements for the Naval Chapel.
2. Install accent lights to highlight the windows and chapel.
3. Install Internet service, alarm system, and fire protection sprinkler system.
4. Upgrade electrical service.
Date: October 24, 2023
Subject:
ADOPT A RESOLUTION APPROVING A DESIGN PROFESSIONAL SERVICES AGREEMENT WITH GARAVAGLIA ARCHITECTURE, INC. FOR ARCHITECTURAL DESIGN SERVICES IN THE AMOUNT OF $222,745.00 PLUS CONTINGENCY FOR THE NAVAL CHAPEL / QUARTERS A
IMPROVEMENT PROJECT AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAME
• Quarters A
1. Construct an ADA ramp to provide access between two areas in the yard.
2. Install new irrigation system, exterior lighting, and catering area pavers; replace turf; and replace and repair hardscape.
3. Servants’ quarters (located near Quarters A):
▪ Remodel two bathrooms to meet current ADA standards.
▪ Replace a window on the east side of the building with a patio door. ▪ Install new flooring and electrical service.
▪ Remove the interior wall.
Phase 2
• Quarters A and Servant’s Quarters:
1. Replace the roof, which will require a site plan and technical specifications to secure a building permit.
Phase 3
• Naval Chapel
1. Refinish the exterior shake siding.
• Quarters A
1. Repaint exterior walls.
• Servant’s Quarters
1. Repaint exterior walls.
Six firms submitted proposals; all six firms were interviewed on Friday, September 8, 2023. The consultant selection panel (Panel) selected three firms to advance to a second interview held on Wednesday, September 13, 2023. The Panel selected Garavaglia Architecture, Inc. as the most qualified architectural firm to provide services for this project.
Staff recommends approval of a Design Professional Services Agreement with Garavaglia Architecture, Inc of San Francisco, California, in the amount of $222,745.00 plus a 15% contingency. Design is scheduled to start following execution of the agreement.
FISCAL IMPACT
There will be no fiscal impact on the General Fund associated with this item, as it is 100% funded by an Economic Development Initiative Community Project Funding (CPF) grant.
Date: October 24, 2023
Subject:
ADOPT A RESOLUTION APPROVING A DESIGN PROFESSIONAL SERVICES AGREEMENT WITH GARAVAGLIA ARCHITECTURE, INC. FOR ARCHITECTURAL DESIGN SERVICES IN THE AMOUNT OF $222,745.00 PLUS CONTINGENCY FOR THE NAVAL CHAPEL / QUARTERS A
IMPROVEMENT PROJECT AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAME