Text extracted from the city's file for reading and search. Open the original on vallejoca.api.civicclerk.com. That file is the official record.

Item 9.A Skyview Reservoir ReplacementWater DepartmentRecommendation: Approve the Construction Contract with Mountain Cascade, Inc.February 24, 2026 Recommendation
Adopt a resolution awarding the construction contract to Mountain Cascade, Inc.Contract amount: $16,823,596Authorize the City Manager to execute the contract and related documents Recommendation
•Essential to reliable distribution of drinking water in Vallejo•Funded by the 2021 Revenue Bond Proceeds•Routine award of contract Background•6 Million Gallon Concrete Tank –1968•Located off Goheen Circle in Han’s Park•Provides pressure, supply, and fire flow to system•One of two tanks supplying the 292 Pressure Zone [Replace with Image]

Existing Conditions and Engineering Recommendations
[Replace with Image]
•Long-term leakage observed•April 2021 leak test:•~115,000 gallons per day•Water seeping through hillside 250 feet west of tank

Tank Inspection
[Replace with Image]
•2021 inspected and assessed Skyview as part of the Tank Inspection and Cleaning Project•Conclusions:•Poor Condition•Tank past useful life•Replacement is the most prudent long-term solution

Project Overview
•Construct new 6.0 MG AWWA D110 Type Iprestressed concrete tank•Demolish existing reservoir•Full site redevelopment to modern standards•Pipeline relocation of Trans-Vallejo transmission main•Improved site security Major Work Elements•Demolition of existing tank•Site work: excavation, fill, compaction, drainage•Geotechnical investigation & hazardous materials testing•New tank: Foundation, walls, roof, liner•Mechanical, electrical, instrumentation & controls•Piping, valves, access, safety features•Coatings, cathodic protection, security, lighting•Final site restoration Project Overview
Bid Process
•Advertised: October 1, 2025•Bids received: November 20, 2025•Reviewed for:•Responsiveness•Responsibility•Compliance with City procurement rulesEngineer’s Estimate:$17,760,919 Mountain Cascade, Inc.Thompson Builders Corp.
$16,823,596$20,659,738.08

THANK YOUBeth Schoenberger –Water [email protected] Cansdale –Water Operations [email protected] of Vallejo555 Santa Clara StreetVallejo, CA 94590www.cityofvallejo.net

Legislative Advocacy Services OverviewState & Federal Legislative PlatformFebruary 24th, 2026 Our State & Federal Lobbying PartnersAkin Gump Strauss Hauer & Feld LLP•Representative: Susan Lent•Contract Start: 2019•Scope: Federal advocacy (direct advocacy with government decision-makers, forming & coordinating professional teams, drafting/analyzing/monitoring legislation, coalition management, grassroots lobbying, policy strategy).

Gonsalves & Sons•Representative: Paul Gonsalves•Contract Start: 2023•Scope: State legislative advocacy (funding & policy initiatives, liaison with state agencies, monitoring legislation).

Capitol Advocacy Partners•Representative: Mary Bergstrom•Contract Start: 2021•Scope: Federal advocacy for Police Dept. (Public Safety & Mental Health Education & Job Training, Economic Development & Housing, Transportation & Infrastructure, Federal-State Coordination).

Akin Gump Strauss Hauer & Feld LLP
•Global law and lobbying firm with a dedicated government relations team•Works across federal agencies, Congress, and international policy venues•Experienced in securing funding, advancing legislative priorities, and coalition-building•Known for strategic planning and rapid-response advocacy

Capital Advocacy Partners•Specializes in federal advocacy for local governments with a focus on public safety, primarily working with the Vallejo Police Department.•Collaborates with lawmakers and agencies to address Vallejo’s public safety priorities.•Monitors federal policies and tracks relevant legislation affecting the City.•Assists with identifying and applying for federal grants for police programs.

Joe A. Gonsalves & Sons•Founded in 1975, specializing in state government relations.•Advocates for local governments, focusing on transportation, housing, and public safety.•Strong connections with California legislators and state agencies.•Provides strategic advice on state legislation and funding relevant to Vallejo.

Legislative Advocacy Procedural History2016 –Concept IntroducedStaff first introduces the idea of a City Legislative PlatformCouncil directs staff to develop a framework and begin monitoring legislationCouncil clarifies that ultimate advocacy authority remains with the Council2017 –Framework ProposedSupport / Oppose / Monitor system and priority categories presentedCouncil discusses capacity for tracking, timely action, and engagement proceduresFramework is not yet adopted, but feedback informs future process2018–2019 –Practice BeginsStaff begins applying draft framework conceptuallyEngagement with legislators, lobbyists, and professional associations beginsBuilds experience and process before formal adoption Feb 2019 –First Formal AdopBonCouncil adopts official LegislaEve PrioriEes & Advocacy Procedures (Resolu'on 17-034 N.C.)Categories codified: General Government, Housing, TransportaEon, Economic Development, and moreAnnual updates directed and distribuEon to stakeholders establishedMay 2023 –ReaffirmaBon & UpdateCouncil updates plaPorm to reflect current goals and legislaEve trendsMaintains alignment with evolving Council prioriEes and advocacy strategy 2016Concept Introduced2017Framework Proposed2018-2019Practice Begins2019First Formal Adoption2023Reaffirmation & Update Legislative Platform Overview
!General Government•Protect local control and government opera\ons•Support funding for essen\al services and infrastructure "Housing & Neighborhoods•Increase affordable, transi\onal, and suppor\ve housing•Protect exis\ng housing opportuni\es #Transporta8on & Infrastructure•Secure funding for roads, transit, and infrastructure projects•Encourage efficient delivery and partnerships $Economic Development•Support redevelopment, business incen\ves, and workforce programs•Promote strategic development of Mare Island and underserved areas %Environment & Water Resources•Promote renewable energy, water infrastructure, and climate resilience•Support broadband and digital inclusion &Public Safety & Emergency Response•Support crime preven\on, mental health services, and disaster preparedness•Preserve local public safety authorityNote: Full Legislative Platform provided to Council for reference.Staff ProcessMonitor & Track → 2. Evaluate & Posi\on → 3. Take Ac\on → 4. Report & Inform → 5. Council Oversight NEXT STEPS/THANK YOUSidney Wilson –Legislative Advocacy OverviewCity Manager’s [email protected] Santa Clara StreetVallejo, CA 94590www.CityofVallejo.net FY 2025-2026 Mid-YearBudget PresentationAndrew Murray, City ManagerNalungoConley, Acting Finance DirectorFebruary 24, 2026 Agenda•General Fund Overview•General Fund Revenue & Expenditure•Staffing Changes•Next Steps 2 General Fund Overview
3 General Fund at a Glance as of December 31, 2025
4 5
General Fund Revenue & ExpenditureFY 2025-2026 Revised and Mid-Year!"#AB&AD EF*+,-* ./M#N-2P4R2+S./M#T**R,R/4+S !"#AB&AD U-9R:-*#;Y*=-, >M/?-2,R/4: T*?Y:,@-4,:ABF-4*R,YM-:T@-4*-*#;Y*=-, T:#/.#C-2-@ a-M#bcd#AeAB T:#/.#!-aMY+Mf#Agd#AeAD
T*/F,-*#;Y*=-,
;-=R44R4=#!Y4*#;+S+42- !""""""""#$B&'E!"""""""""""""""""""#B&)$ *!"""""""""""""""" *!"""""""""""""""" !""""""""&)B+I$ -.L.01.O )&#BP$& &#4 *"""""""""""""""""" *""""""""""""""""""" )&&B)#) RST.08V:1;.O"*"<=>=;V.O"?"@.0.AV:O
<=>=;V.O I#BP)& *"""""""""""""""""""""""""" BPB'&4C &P$ 'IB+I' aL.;:Vb. IB&+& *"""""""""""""""""""""""""" 'B+I) #EE )EB#)' @.0.AV:O I#B44& *"""""""""""""""""""""""""" *"""""""""""""""""" *""""""""""""""""""" I#B44& c.=L."d=ef1:O IEE *"""""""""""""""""""""""""" *"""""""""""""""""" IEE )BEEE d;fJ.K:.8"i=K=0V.O *"""""""""""""""""""""""""""" *"""""""""""""""""""""""""" *"""""""""""""""""" *""""""""""""""""""" *"""""""""""""""""""""""""""" RST.08V:1;.O"*"<.;LVK."?"<1TT>V.O &EBE4$ *"""""""""""""""""""""""""" *"""""""""""""""""" )B$P$ &#BE+4 j;=0OA.;O"=08"<1NOV8V.O *"""""""""""""""""""""""""""" *"""""""""""""""""""""""""" +&) *""""""""""""""""""" +&) l0:.;A108"-.VbN1;O.b.0: B&B&#4C *"""""""""""""""""""""""""" *"""""""""""""""""" *""""""""""""""""""" B&B&#4C jf:=>"RST.08V:1;. )&4B##) *"""""""""""""""""""""""""" B#B)I+C &BEI4 )&$B)#& BIB'#4C &#4 #B)I+ B&BEI4C B+BEE#C
A4*R4=#!Y4*#;+S+42- !""""""""#&B$)# !""""""""#IB+IP
m"fA"RST.08V:1;. )Pn&Em )4n''m
h-,#U-9-4Y-iABF-4*R,YM-:#
jNYMFSY:jC-.R2R,ll
>M/F/:-*#mR*f-+M
General Fund Revenue & Expenditure
6 7*Transient Occupancy Tax, Property Transfer Tax, Franchise Tax, Real Property Excise Tax, Rentals, Discovery Kingdom, & Water Rights General Fund RevenueFY 2025-2026 Revised and Mid-Year!"#!$%$FG$%$( )*+,-*.!!
!"#!$%$FG$%$(
I0*1.*.!!
!2-!34!5$6756$F! !2-!34!$6$86$(!
!"#$%"F'()*+ ,(((((-.I01 ,(((((-2I34 ,(((((5I22 -I67
!"#$%"F'()*+(89:;8%<(=L?@AB (41I32 (41I.3 5I-.(((((((((((((( 4IC7 (15I64 (14I61 4I53(((((((((((((( -I07
M*;%E()*+( (4CI63 (4CI55 =5I63B(((((((((((( =1I67B
)"*9E*FF8#9(G(HE%()*+(:(L%*E<"%(I (-5I-C (-5I-3 =5I50B(((((((((((( =5I37B )"*9E*FF8#9(G(HE%()*+(:(L%*E<"%(! (4CI20 (4CI25 =5I50B(((((((((((( =5I-7B (02I60 (0.I63 =4I5-B(((((((((((( =4IC7B
HF8;8F'(HE%"()*+ (42I-6 (4.I6. =5I33B(((((((((((( =4I67B J*99*O8E()*+(=L%*E<"%(JB (-I55 (4I1- =5I0CB(((((((((((( =-CI67B I<E89%EE(@8F%9E%()*+ (-I5- (4I6. =5I5.B(((((((((((( =-I67B LFM%"(N (-5I-. (46I60 =5I34B(((((((((((( =4I07B
9:;<3<2=>!?*1*@2=
!!!!!A1@*-<@,B<*.!)*+*1:*- !58%68$ !57C65M E56$FF!!!!!!!!!!!! E%6CGF !"#O"*P(Q%R%9<%E (44I44 (4-I.. 4I00(((((((((((((( 43I67 )#F*;(=S+F;<T89O(L%*E<"%(!B (43-I26 (433I4- (5I33 5I-7
H3<2=!EI1B=:.,1J!K*2-:@*!LF M!!!!!5F56F8 M!!!!!5F56N$ M!!!!!%6$N 5I-7 ?*1*@2=!":1.!)*+*1:*-
=U9(L8;;8#9EB !O,44*@*1B*!
IKH!!!G
8 General Fund RevenueProperty & Sales Tax Trend
9 General Fund ExpenditureFY 2025-2026 Revised and Mid-Year!"#!$%$F'$%$( )*+,-*.!
!"#!$%$F'$%$(
/0*1.*.
!/-!23!4$5645$F! !/-!23!$5$75$(!
89:*1.,;<=*-
!"#"$%&G ())))))))))*+,-. ())))))))))I*,0* 1()))-,203 1.4,I53 67&$8%9& *,40 .2,+. I,:* ;2,*5
<&=&L%8G *+,:: *+,:: ?)))))))))))))) ?)))))))))))
@&"7&)A"BCM8G 2,*2 .,22 2,*2 .22,25
E&F%G#&)9"%=8&="=G&H$&I#"G&9&=8 I,4: I,4: ?)))))))))))))) ?))))))))))) J8%#%8%&G +,-4 4,24 2,42 ..5
!&$7%G&G)"=O)!MII#%&G .I,4: .0,20 .,0: .+5
<C=OGL)@&"G&G)"=O)68F&$)MCG8G 2,;: 2,;: ?)))))))))))))) ?))))))))))) N$"=GL&$G)"=O)!MOG%O%&G -,04 :,+0 2,04 :5
P&=&$"#)@%"O%#%8B -,4- -,4- ?)))))))))))))) ?))))))))))) M%8BQ%O&)67&$F&"O 1.2,-23)))))))))))))) 1.2,-23)))))))))))))) ?)))))))))))))) ?))))))))))) >2;?@ A!!!!!!!!!!46B5$$ A!!!!!!!!!!46C54$ A!!!!!!!!!!%5C% 1R=)S%##%C=G3
M,33*=*1E*!
/F>!!!G
10 $1.98M General Fund Service & Supplies Expenditure Request FY 2025-2026 Mid-Year Proposed Allocation!"#$%FG(F)* +%F,F*-.I0"12"#(0"3F#"4I56)2*( 7F(8I5(()%*"8I9I:;K=L
?-@I?FA%-%8IB2A.F$-(F)*# K=CMMMIIIIIIIIIIIIIIIIIII 9IIIIIIIIIIIIIIIIIIIIIIIIIII ?",-.IN""#FG*3"#(F,-(F)* ;MMCMMMIIIIIIIIIIIIIIII KMMCMMMIIIIIIIIIIIIIIIII 7F(8I7)2*$F.I9I:KH=L
IF#$HIJOG"*#"#IL!F**"%#I7)2*$F.M KC=MMIIIIIIIIIIIIIIIIIIIII KC=MMIIIIIIIIIIIIIIIIIIIIII 7F(8II-*-,"%I9I:NKHOL
P"-2(FQF$-(F)*I7)66F#F)*F+(R"%IS"%3F$"# TMMIIIIIIIIIIIIIIIIIIIIIIIII 9IIIIIIIIIIIIIIIIIIIIIIIIIII 7)6G2("%IJ12FG6"*( UCMMMIIIIIIIIIIIIIIIIIIIII 9IIIIIIIIIIIIIIIIIIIIIIIIIII IF#$HIJOG"*#"#IL!F**"%#I7I+M VC=MMIIIIIIIIIIIIIIIIIIIII 9IIIIIIIIIIIIIIIIIIIIIIIIIII +(R"%IB%)Q"##F)*-.IS"%3F$"#I9I?5N7+ =NCMMMIIIIIIIIIIIIIIIIIII =NCMMMIIIIIIIIIIIIIIIIIII +(R"%IB%)Q"##F)*-.IS"%3F$"#I9I0))#"3".(IP%)2G V=CMMMIIIIIIIIIIIIIIIIIII V=CMMMIIIIIIIIIIIIIIIIIII S)Q(@-%"IB%),%-6#I9IX"@IY).2*(""%#F7J0R KCMMMIIIIIIIIIIIIIIIIIIIII 9IIIIIIIIIIIIIIIIIIIIIIIIIII B).F$"I+3"%#F,R(I[I5$$)2*(-AF.F(8I7)66F##F)*ILB+57M9IIIIIIIIIIIIIIIIIIIIIIIIII =UCMMMIIIIIIIIIIIIIIIIIII 7F(8@F4"I9I:;MML
\-("%I]#-,"IQ)%I7F(8IB%)G"%(F"# ;MMCMMMIIIIIIIIIIIIIIII ;MMCMMMIIIIIIIIIIIIIIIII J$)*)6F$I!"3".)G6"*(I9I:N=L
+(R"%IB%)Q"##F)*-.IS"%3F$"# N=CMMMIIIIIIIIIIIIIIIIIII N=CMMMIIIIIIIIIIIIIIIIIII NF*-*$"I9I:KKUL
524F(IN""# =MCMMMIIIIIIIIIIIIIIIIIII =MCMMMIIIIIIIIIIIIIIIIIII B%)Q"##F)*-.IS"%3F$"# KUCMMMIIIIIIIIIIIIIIIIIII KUCMMMIIIIIIIIIIIIIIIIIII G*$%"-#"IB"%Q)%6-*$"I524F( VMMCMMMIIIIIIIIIIIIIIII =MCMMMIIIIIIIIIIIIIIIIIII ?)*,I0-*,"INF*-*$F-.IG.-**F*, =MCMMMIIIIIIIIIIIIIIIIIII K=CMMMIIIIIIIIIIIIIIIIIII 11 $1.98M General Fund Service & Supplies Expenditure Request FY 2025-2026 Mid-Year Proposed Allocation
•Decrease of $573,900 from the original $2.55M request. !"#$%FG(F)* +%FHF*-.I0"12"#(0"3F#"4I56)2*(
7F%"I8I9:;;K
=12FG6"*(I8I>"?F$." @ABCMMMIIIIIIIIIIIIIII 8IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII E-#IFI=."$(%F$F(G HICMMMIIIIIIIIIIIIIIIIII HICMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII J)O(L-%"IM%)H%-6 @BMCMMMIIIIIIIIIIIIIII BMCMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII N26-*I0"#)2%$"#I8I9BOBK
+(?"%IM%)O"##F)*-.IJ"%3F$"# :M@CMMMIIIIIIIIIIIIIII :M@CMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0"$%2F(6"*(IJ"%3F$"# @O:CMMMIIIIIIIIIIIIIII @O:CMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII P*O)%6-(F)*-.IQ"$?*).)HGI8I9OM:K
!2"#IFIM2R.F$-(F)*# @MCMMMIIIIIIIIIIIIIIIIII @MCMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII J)O(L-%"IM%)H%-6# @;:CMMMIIIIIIIIIIIIIII SACMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII M).F$"I8I9:S@K
T)6G2("%I=12FG6"*( HMCMMMIIIIIIIIIIIIIIIIII HMCMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7F".4I=12FG6"*(I5$12 IIC;IMIIIIIIIIIIIIIIIIII IIC;IMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JG-$"I0"*(-.IT?-%H"#IUQ)LF*HV OOICMMMIIIIIIIIIIIIIII OOICMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII M2R.F$IP)%X#I8I9@BIK
+(?"%IJ2GG.F"#I8IN).F4-GI!"$)%-(F)* OMCMMMIIIIIIIIIIIIIIIIII 8IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0YRI0"?-RF.F(-(F)* @;CMMMIIIIIIIIIIIIIIIIII @;CMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII J"$2%F(GIJ"%3F$"# HSCMMMIIIIIIIIIIIIIIIIII HSCMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII J)O(L-%" OMCMMMIIIIIIIIIIIIIIIIII OMCMMMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII !"#$%FG()(*$%F+,)-./001/102FFFFFFFFFFF 3/454/602FFFFFFFFFFFFFFFFFFFFFFFFFFFF Staffing Changes
12 13
•Decrease of $237,994 from the original $513,660•Public Works Director salary change $1,709•Part-time PRA Coordinator extra help $101,595General Fund Planning & Development Services
FY 2025-2026 Mid-Year Proposed Staffing & Adjustments
!"#$%&'"(& )*+,&,*(-.,&/" 0%,1,($/-2"34"+&2"5,+"6-7'*4(& 89*(*',9-!"5"/*#'"(&
!"#$%%&%'("%')%*$%+,$- .I0123''''''''''''''''''''' !"#$%&'&&(((((((((((((((((( :,($(9"
!"#$%%&%'("%'4**(5"+,"+ 1.03I6''''''''''''''''''''' )(((((((((((((((((((((((((((((( !"#$%%&%'("%'4789"9:+$,+9;%'4",<-:+'== 6L0L?1''''''''''''''''''''' *+#+,$'&&(((((((((((((((((( ;4'$(-2"+*4%9"+
!"#$%%&%'("%'4789"'@<%$A'=='B'@ .602L?''''''''''''''''''''' )(((((((((((((((((((((((((((((( !"#$%%&%'("%')%$*(""%+',%-."/-/0" 123456''''''''''''''''''' )(((((((((((((((((((((((((((((( !"#$%%&%'("%'C8M<(-%%',"7'E,F($'G%<,+9(":H9M'I##9*%$743785'''''''''''''''''''' -&#-+.'&&(((((((((((((((((( !"#$%%&%'("%'J%$:(""%<'4",<-:+'== 9''''''''''''''''''''''''''' )(((((((((((((((((((((((((((((( <(=*%'$&,*(-."9>(*/*1?
477'("%'4789"9:+$,+9;%'4",<-:+ 6L0L?1''''''''''''''''''''' )(((((((((((((((((((((((((((((( )*/,9"-!"#$%&'"(&
477'("%'@$98%'4",<-:+ ??0?I.''''''''''''''''''''' B'''''''''''''''''''''''''''''' 477'("%'J$(O$,8'L,",O%$ M603M.''''''''''''''''''''' M603M.N33'''''''''''''''''' /0123(450671 $+!#**&(((((((((((((((((( %"$#***((((((((((((((((((((( 14 •General Fund Mid-year Fiscal Impact $379K–Includes $102K part time budget for a PRA Coordinator–Includes $2K increase for Public Works Director •Planning and Development Services Mid-year changes with no Fiscal Impact.

FY 2025-2026 Mid-Year Proposed Staffing & Adjustments

Next steps
15 Step 2 of Midyear will occur on March 10, 2026
FY 2026-2027 Proposed Budget Development Process for Council Direction•Special Council Meeting -Council 1stStudy session ~ around March 31, 2026 vPresentation of FY 2026-2027 General Fund baseline budgetvKey assumptionsvCouncil requests•Special Council Meeting -Council 2ndStudy session ~ around April 21, 2026vCosting of proposals from previous council meeting in MarchvCommunity survey resultsvDirection from council for programs to be incorporated into proposed 2026-2027 budgetv5-year General Fund forecast•Proposed budget published on May 15, 2026•Special Council Meeting on June 2, 2026vStudy Session & Review of Preliminary Proposed Budget•Presentation to Council of revised proposed budget on June 9, 2026

CONTACT(S)
[email protected]
Economic Development and Planning & Development ServicesJanuary –December 2025, Year-End UpdateFebruary 24, 2026Gillian Haen, Assistant City ManagerBrad Paul, Interim Economic Development DirectorKristin Pollot, AICP , Planning & Development Services Director

Economic Development Department
Economic Development
Implementing ED Strategic Plan•Revolving Loan Fund ($355K)ØARPA funds approved by City Council Ø2025: Solano EDC approved 2 loans ($100K)Ø$125K loan in Feb brings total to $225K•Pop-Up Events (Ferry & Downtown)ØRFP $34K issued 1/7/26 -10 proposals receivedØInterviewing finalists in early March ØRequesting funds in midyear budget

Economic Development
Implementing ED Strategic Plan•Shop Local CampaignØ$28,000 for first year, $48,000 for 2-year contractØReceived EDC Commission input at 1/14/26 meetingØPosting RFP late Feb or early March•Long Range Property Management PlanØRequesting funds in midyear budgetØDrafting RFP after funding is received

Economic Development
Grant Implementation
•City’s Hardening GrantsØCity Council allocated $125,000 for Round 3 mid-year 2025ØReimbursed businesses who submitted receipts for security improvementsØGrants were awarded to 17 Vallejo small businesses in amounts up to $3,000 Economic Development
Development Projects
•PG&E site (26-acre parcel) ØCompleted soil contamination clean up ØBoat Launch Parking Lot 90% doneØSite was closed to public and under surveillance until project completedØCity will close vehicle gates at dusk and reopen at dawn (AX9 will patrol site) Economic Development
Development Projects•Blue Rock SpringsØLewis Group held 5 community meetings to present its plans, answer questions and receive comments Ø9/9/25: presented 3 concepts to City Council includinggolf course, event center and 600 units of housing •CostcoØCostco store with tire center, gas station, 774 parking spaces, and fourother buildings with a restaurant and additional 188 parking spacesØApproved with 178 homes, developer now proposes 245 units

Economic Development
Mare Island AgreementsWorked with Mare Island Company (MIC), Dept of Navy, State Lands Commission and Lennar Mare Island on:ØMare Island Development Agreement (DA) ØMIC Master Sublease Agreements (e.g. dry docks, piers)ØMIC Reimbursement Agreement to defray city expensesØState Lands Trust Parcel Terminations ØIsland Energy Gas & Electric AgreementsØMare Island Infrastructure Assessments

Economic Development
Federal Grants•U.S. Environmental Protection Agency (EPA) $600,000 Brownfield Cleanup Grant 2021ØCompleted 24 environmental assessments•U.S. Environmental Protection Agency (EPA) $500,000 Brownfields Assessment Grant 2025ØCity secured second Brownfields Assessment Grant(2025)Ø4-year implementation period for assessments of at least 10 sites on Mare Island and elsewhere•U.S. EDA Mare Island Infrastructure Assessment Øcompleted 10/20/25 and presented to City Council 11/4/25 ØUS EDA ($1.5M), MIC ($326K), City in-kind staff time ($240K) Economic Development
Federal GrantsRehabilitation of Quarter’s A Mansion and Chapel on Mare Island (2 grants)•U.S. Nat’lPark Service: Quarter’s A ($1.5M)ØArchitecture firm selected for design workØPlan/Building/Environmental review underway•U.S. Dept of Housing & Urban Dev (HUD): Quarter’s A and Chapel ($1.2M)ØExpecting to go to bid late Spring 2026, combining NPS and HUD into single bid to achieve cost savingsØWorking with Mare Island Historic Park Foundation

Economic Development
Land Disposition and AcquisitionPMA Housing Area Navy Transfer RequestØ14-acre site includes 6 officer’s homes built from 1860 -1911ØNavy submitted draft deed to City for conveyance of the site ØCity is performing due diligence:§Environmental Assessment§Project Feasibility Analysis§Building Conditions Assessment

Economic Development
Commissions and Boards•Economic Development Commission (EDC)ØNew work plan approved by City Council at 7/22/25 meetingØForming Ad Hoc Subcommittees to implement 5 work plan strategiesØWork plan implementation target is two years or longer•Commission on Culture and the ArtsØHeld goals and work plan meeting 4/24/25ØWorked on draft Long-Term Citywide Arts and Culture StrategyØWill present draft work plan and budget to City Council 3/2026 Economic Development
Commissions and Boards•McCune Collection CommissionØOpen McCune Room on 1st/3rd Tuesdays and 2ndFridays (Art Walk) for public access and demonstrations of the Albion PressØRevised goals and 2024 work plan to present to City Council 3/2026•Remediation Advisory Board (RAB)ØCity representative at quarterly meetings•Mare Island Historic Park Foundation (MIHPF) ØCity representative at bimonthly meetings Economic Development
Economic Development Partners•Solano County Economic Development Corp. (EDC) ØTwo-year contract for Revolving Loan Fund, attend monthly meetings.•Solano/Napa Small Business Development Center (SBDC)ØPartnered with SBDC to assist Vallejo businessesØProvided 1:1 support and advise to 164 clients•Vallejo Chamber of CommerceØAttended monthly Gov’t Affairs, ED Committee and networking meetings•Vallejo Convention & Visitors’ Bureau(Visit Vallejo)ØPartnered with Visit Vallejo to promote tourism•Regional Chambers of CommerceØCollaborated on Economic Development activities Economic Development
Current Department Staffing•EDD Director: Vacant•Program Manager: Ivette Iraheta•Program Manager: Vacant•MI Program Manager: Erin Hanford•Senior Com Dev Manager: Annette Taylor•Administrative Analyst II: Cathy Nubla•EDD Secretary: Vacant Economic Development
Upcoming City Council Briefing (April)Review of ED Work Plan, Strategies and Staffing•Updates and Recommendations Economic Development Priorities•Retain Existing Businesses•Attract New Businesses/Jobs/Revenue•Position Vallejo to support the Regional Economy-Focus on Shipbuilding, Manufacturing, Construction, Health Care-SupportWorkforce Development for Vallejo Residents/Students-Partner with SF, Silicon Valley, Fremont and GoBIZto market Vallejo’s assets to companies thinking of leaving Bay Area.

Economic Development
Research & Develop-mentPrototyping & TestingPre-Commer-cializationCommer-cialization Silicon Valley AdvantageEast Bay Advantage
Stages of Advanced Manufacturing
Central Valley Advantage●Location SpecializationAcross the Region & Within the Mega-RegionCollaboration w/ neighboring regions can support an emerging industry cluster in the mega-regionOpportunities like chip manufacturing and biofuel production are more viable clusters if multiple sub-regions or regions collaborate to take advantage of their respective strengths—availability and cost of land, housing, and a trained workforce ØCreate New Jobs in Vallejo/Mare Island to Stop Companies from leaving Bay Area/CA Planning & Development Services (PDS) Department
PDS Department Overview-2025 Year End Accomplishments
•Implementation of the Tobacco Retail License (TRL) Ordinance, which took effect in February 2025.•Ramping up of the Vacant Real Property Registration Program•Streamlining efforts related to Additional Dwelling Units (ADUs)•Completion of Phase 1 –Zoning Code language clean ups•Approval of the 131-unit Rollingwood Subdivision•Release of RFPs for grant-funded Downtown & Waterfront Specific Plan updates•Review of 1stdraft submittal of proposed new Mare Island Specific Plan•Adoption of new 2025 Building Code•General customer service improvements

Code Enforcement Division•Staff retention continued to be a challenge during 2025 •Total caseloads for 2025 (opened vs. closed) are similar to previous year numbers•Code Officers have started managing broader zoning enforcement cases with assistance from planners•The number of PR/VL cases doubled in 2025; however, consistent enforcement and monitoring remains a concern•Vehicle abatement totals were lower due to process modifications required [Replace with Image]
CODE ENFORCEMENT CASES2024 Year-End Totals2025 Year-End TotalsTOTAL OPENED CASES 32603183TOTAL CLOSED/RESOLVED CASES32153032Total Citations (FINES) Issued468452CE/VA -Opened30942242CE/VA -Closed30932179CE/VA Citations/NOVs (FINES) Issued468411ZV -Opened0608ZV -Closed0551ZV Citations/NOVs (FINES) Issued00PR-Opened158241PR -Closed118231PR Citations (FINES) Issued026VL -Opened892VL -Closed472VL Citations (FINES) Issued015VEHICLE ABATEMENT (PRIVATE PROPERTY) -Total Vehicles415106PROPERTY ABATEMENT WARRANTS (Executed Abatements)00 Code Enforcement Division
[Replace with Image]
•Voluntary compliance rates between 79% to 93% over the last year•Code Officers attended 30 public meetings during 2025•Recent successes (not in summary report) include:•Division SOP drafting 90%complete•2260 Sacramento clean up•Island Pacific Market on Springs Road –private alley paving completed

Code Enforcement Division
[Replace with Image]

Building Division•Recruitment challenges have continued –working with HR to make position adjustments•Averaged 309permits issued each month and 952inspections each month •Total permits issued are slightly lower than 2024, however, job valuations and fees collected are much higher than last year.•Solar and ADU permits were also down, but permit streamlining efforts have continued:•Advertising instant solar permits online•Published ADU mini-guide for homeowners Permit Activity Types2024YEAR END TOTALS2025YEAR END TOTALSOverall (Total) Building Permits Issued4,1163,705Single-Family Permits Issued1,2921,190Single-Family Permits Finaled989971ADU Permits Issued6230Solar Permits Issued932783Total Fees Collected (For Issued Permits)$6,407,534$7,590,018Job Valuation Issued$123,584,690$175,993,238Inspections Completed7,85011,430 Planning Division –Current Planning
•Staffing remained stable in 2025 (fully staffed)•Total number of planning applications and approvals are up from the previous year. •Noteworthy project approvals during 2025, include:•Phase 1 Zoning Code Language Clean Up (CC 1/7/25)•Two new single-family homes approved within the St. Vincents Historic District (AHLC 1/16/25 & 2/20/25)•Sky Zone (PC 3/3/25)•Warren Avenue General Plan Amendment/Rezoning (CC 6/24/25)•Rollingwood Subdivision, 131 new single-family homes (PC 11/3/25)•71 TRL applications approved (July 2025)•9 Cannabis renewal applications were received and 7 were approved (June 2025) Planning Division –Current Planning
[Replace with Large Image or Chart]

Planning Division
Affordable Housing Production Status –6thCycle RHNA, 2023-2031 Planning Division –Long Range
Downtown & Waterfront Specific Plans•Completed all required master funding agreements for the $2.4 million in project grant funds •RFPs released in October, final consultant selections expected in mid-March, with project kick-off expected in May/JuneHousing Element Program F 1.1.3 –Renter Protections and Housing Stability•Consultant selection expected in mid-March, with Council approval in April and project kick-off no later than MayInclusionary Housing & Commercial Linkage Fee•Joint workshops held in July & November with direction provided to move forward with ordinance drafting•Ordinance drafting underway, with work anticipated to be completed by Q3 2026, and draft ordinances presented to Council by Q4 2026.

Planning Division –Long Range
Environmental Justice General Plan Amendments•Administrative draft of proposed amendments in review.•Public review period anticipated in mid-2026Mare Island Specific Plan (MISP) & DDA Status•1stdraft MISP reviewed and formal comments provided in February 2026•Revised draft MISP submittal anticipated mid-year 2026•MISP environmental consultant selected & public EIR scoping meeting anticipated for August 2026•Mare Island Beautification Plan in final review with approval phases contingent on completion of Navy clean-up project on North Mare Island•Connolly Corridor project preliminary review complete, but formal project entitlements delayed pending resolution of VFWD service issue 2026 Workplan Highlights•Completion of User Fee Study process for Building & Planning•Add additional instant online permitting options in Building•Continue TRL enforcement work•Ramp up Sidewalk Vendor enforcement work•Monthly monitoring for Vacant Real Property program •Complete Code Enforcement SOP and training manual updates•Phase 2 Zoning Update –‘Procedures’ sections•Continue development review process streaming efforts •Complete ADU ordinance updates (to comply with State Law changes)•Continue Housing Element program implementation•Renter Protections & Housing Stability•Inclusionary Zoning & Commercial Linkage fees•Continue advancing long range planning initiatives (Specific Plans)•Complete recruitment for new Code Enforcement Manager to help with retention issues•Complete vacant Building position adjustments to increase recruitment success rate

Questions?
THANK YOUSTAFF CONTACTS:Brad Paul, Interim Economic Development [email protected] Pollot, AICP , Planning & Development Services [email protected] Haen Assistant City [email protected]

2025 YEAR END SUMMARY /

ACTIVITY REPORT

PLANNING & DEVELOPMENT SERVICES

DEPARTMENT

February 2026

Prepared by:

Kristin Pollot, AICP, Planning & Development Services
Director

2 PDS 2025 Year End Summary
February 2026
I. PDS Department Overview
The Planning & Development Services Department (PDS) includes the Code Enforcement, Building, and Planning divisions.

Some high-level department-wide accomplishments from 2025, include the following:

1. Implementation of the new Tobacco Retail License (TRL) program (see page 9 below for additional details).

2. Ramp up of the Vacant Real Property Registration Program, including the addition of vacant commercial buildings to the program (previously authorized by the City Council in 2020, but not implemented until 2025) and limited enforcement of existing cases (see page 10 for additional details below).

3. Created new Mills Act monitoring documentation for the existing 19 properties currently in contract (individual contract auditing will begin in 2026).

4. Streamlined ADU process in compliance with State law, published an ADU mini-guide with step-by-step instructions to help homeowners navigate the process, and created a new ‘Housing Development Resource’ page on the City website to provide information on different housing regulations.

5. Approved all entitlements for the Rollingwood Subdivision, which includes 131 new detached, market-rate, single-family dwelling units.

6. Completed 1st phase of Zoning Code language clean ups.

7. Received and reviewed 1st draft of the new proposed Mare Island Specific Plan.

8. Released RFPs to solicit consultant proposals to lead both grant funded Downtown and Waterfront Specific Plans.

9. Adopted new 2025 Building Code.

10. Reduced general customer inquiry response times and building permit turnaround times from a high of 10+ days and 30+ days to 1-2 days and 20 business days (respectively).

11. Building Division team members collectively achieved 6 new International Code Council (ICC) Certifications during 2025, further growing the knowledge base of the team.

Staffing Updates:

o The Code Enforcement Division on-boarded three (3) new Code Officers and one (1) new Secretary during 2025. During this same time, the Division also lost three (3) Code Officers, plus the Division Manager retired. This resulted in a 27%

3 PDS 2025 Year End Summary
February 2026
vacancy rate (3 vacancies out of 11 positions) at the end of the calendar year.  Currently there is one conditional offer in background check to replace one of the vacant Code Officer positions, and recruitment for the Division Manager position is scheduled to start by the end of Q1 2026. If these two roles are filled, there will only be one vacancy left for the Division to fill in 2026 (assuming no other turnover). o The Building Division on-boarded four (4) new staff members during 2025, including three inspectors and one permit technician; however, the Division also lost the new permit technician shortly after they were hired, and the Development Permit Coordinator retired at the end of the year. These changes resulted in a 33% vacancy rate (4 vacancies out of 12 positions) at the end of the calendar year.
 As of February 2026, the Division replaced the vacant Permit Technician role, bringing the vacancy down 25%; however, the other vacant positions have continued to present a recruitment challenge. To address this, Staff has been working with Human Resources to make some position adjustments to better meet the Division needs.  Near the end of 2025, the Plan Check Engineer position was converted to a Plans Examiner role with different minimum qualification requirements. Recruitment for this position is planned to begin in March 2026.  The Building Inspection Manager job description is proposed for minor modification to better clarify the role’s duties. This is currently in process and if approved, will go to recruitment shortly thereafter.  The Development Permit Coordinator position is pending a re-classification review to better facilitate permit technician/front counter management. This is currently in process and if approved, will go to recruitment shortly thereafter.
o Current staffing levels for the whole department, as of February 2026, are shown in the table below:

4 PDS 2025 Year End Summary
February 2026
Permit Counter Interactions:

This chart below illustrates the volume of in-person visits that the PDS Department has seen on a weekly basis during the 2025 calendar year, as tracked by the ‘QLess’ front counter management system. As shown below, the Building Division typically sees the highest volumes of in-person customers with totals ranging from 11 to 60 interactions per week. The Planning Division typically sees about half this amount with ranges from 6 to 21 interactions per week.

It should be noted that the “open” hours for City Hall (including front counter hours for the PDS counter) were extended as of Monday, October 6th to include an earlier opening, a later close, and “open” hours every other Friday. Looking at the chart, there was a small spike in visits during that first week of additional hours; however, the visit volumes seemed to have leveled out after that, as compared to the rest of the year. Friday visit totals have been minimal, ranging from 2 to 13 visitors each day during Q3 for 2025.

It’s also important to note that the front counter data above only provides a partial picture of the larger department’s customer service interactions, as it does not include online submittals, email or phone inquiries, nor does it include average response times related to these interactions/inquiries.

0.00 10.00

20.00 30.00

40.00 50.00

60.00 70.00
1-Jan-25
Jan 6, 2025
Jan 13, 2025
Jan 20, 2025
Jan 27, 2025
Feb 3, 2025
Feb 10, 2025
Feb 17, 2025
Feb 24, 2025
Mar 3, 2025
Mar 10, 2025
Mar 17, 2025
Mar 24, 2025
Mar 31, 2025
Apr 7, 2025
Apr 14, 2025
Apr 21, 2025
Apr 28, 2025
May 5, 2025
May 12, 2025
May 19, 2025
May 26, 2025
Jun 2, 2025
Jun 9, 2025
Jun 16, 2025
Jun 23, 2025
Jun 30, 2025
Jul 7, 2025
Jul 14, 2025
Jul 21, 2025
Jul 28, 2025
Aug 4, 2025
Aug 11, 2025
Aug 18, 2025
Aug 25, 2025
Sep 1, 2025
Sep 8, 2025
Sep 15, 2025
Sep 22, 2025
Sep 29, 2025
Oct 6, 2025
Oct 13, 2025
Oct 20, 2025
Oct 27, 2025
Nov 3, 2025
Nov 10, 2025
Nov 17, 2025
Nov 24, 2025
Dec 1, 2025
Dec 8, 2025
Dec 15, 2025
Dec 22, 2025
Dec 29, 2025
2025 PDS Front Counter Visitor Volume
Building Planning Public Works

5 PDS 2025 Year End Summary
February 2026
II. Code Enforcement Division
During 2025, the Code Enforcement Division opened a
total of 3183 cases and resolved a total of 3032 cases, which is very close to the totals from the prior year.
• Starting in 2025, enforcement efforts under the
Zoning Violation (“ZV”) case type were expanded to
include all zoning enforcement, such as unpermitted
businesses, business activities, signs, fences, etc.

Code Officers are now managing these case types
with assistance from planners.
• The Property Registration/Vacant Lot program
(“PR/VL”) was minimally maintained in 2024, with no
citations issued or monthly monitoring done. During
2025, new registrations doubled and monthly
monitoring was conducted sporadically (this has
been impacted by staffing resource limitations).

Enforcement of vacant commercial buildings
(included in “PR” totals) began in 2025.
• Vehicle abatement year end totals are down from
2024 due to process modifications required by the
City Attorney’s office and an extended period of time
without CLETS access (since the Division
transferred from the Police Department in February
2023).

CODE ENFORCEMENT CASES
2024
Year-End
Totals
2025
Year-End
Totals
TOTAL OPENED CASES 3260 3183
TOTAL CLOSED/RESOLVED CASES 3215 3032
Total Citations (FINES) Issued 468 452

CE/VA - Opened 3094 2242
CE/VA - Closed 3093 2179
CE/VA Citations/NOVs (FINES) Issued 468 411
ZV - Opened 0 608
ZV - Closed 0 551
ZV Citations/NOVs (FINES) Issued 0 0
PR- Opened 158 241
PR - Closed 118 231
PR Citations (FINES) Issued 0 26
VL - Opened 8 92
VL - Closed 4 72
VL Citations (FINES) Issued 0 15

VEHICLE ABATEMENT (PRIVATE PROPERTY)
- Total Vehicles 415 106

PROPERTY ABATEMENT WARRANTS
(Executed Abatements) 0 0

6 PDS 2025 Year End Summary
February 2026

This chart illustrates the workload volume for Code Officers throughout the year, with total open cases worked each month compared to the total number of closed/resolved cases. The additional green line, showing the total citations issued each month, helps to provide some insight into the rate of voluntary compliance (compliance achieved before citations issued) that the division is seeing. This metric is not easy to track due to all the variables; however, the data tracked indicates that the voluntary compliance rate for the ‘closed cases’ each month during 2025, ranged from 79% to 93%. Additional detailed information supporting the chart above is included on the next page for reference. 0 50
100
150
200
250
300
350
400
January February March April May June July August September October November December 2025 Code Enforcement Case Volumes (by Month)
TOTAL OPENED CASES TOTAL CLOSED/RESOLVED CASES Total Citations (FINES) Issued

7 PDS 2025 Year End Summary
February 2026

8 PDS 2025 Year End Summary
February 2026
Code Enforcement, Special Programs/Assignments
o Free Neighborhood Dumpster Program
The Free Neighborhood Dumpster Program is administered by Code Enforcement in partnership with Recology Vallejo and it is intended to assist residents with the lawful disposal of excess household debris. The program provides a total of 150 dumpsters that may be utilized each fiscal year (based on Recology’s fiscal year, which runs from Oct 1 to Sept 30) , or approximately 12.5 dumpsters each month. The table below shows how many dumpsters have been used during each month, compared to the total allocation. For the 24-25 fiscal year , the Division was only able to utilize 56% of the dumpsters available. During the second half of 2025, staff made efforts to advertise the program on the City’s website and through various social media channels. This effort appears to have been effective since utilization for the last quarter of 2025 (Oct-Dec) has tracked higher than in the previous year.

o V-FOG (Graffiti Abatement Program)
The Vallejo-Free of Graffiti (V -FOG) Program is a collaborative effort between Code Enforcement and the Public Works Department - Maintenance Division to address graffiti vandalism on private residential properties. The program involves either a referral from Code Enforcement Officers for property owners to enter into an agreement with the City, allowing Public Works maintenance crews to abate graffiti on private property, or victims of graffiti vandalism may utilize the program by submitting the V-FOG consent form directly to Code Enforcement . During the 2025 calendar year, Code Enforcement was able to execute agreements with 17 property owners to allow for graffiti abatement under the program.

9 PDS 2025 Year End Summary
February 2026
o Tobacco Retail License (TRL) Enforcement
The TRL Program implements the newly adopted requirements of Chapter 5.10 of the Vallejo Municipal Code (VMC). The program became effective February 7, 2025 , and initial implementation work involved retailer outreach, education, and processing of initial license application requests received during a limited application window (which closed on May 8, 2025). As of August 2025, a total of 71 TRL applications have been approved/issued. While initial license applications were processed by the Planning Division, the Code Enforcement Division will be responsible for ongoing TRL program management, including annual license inspection s and enforcement on any establishment s or individuals that may be selling tobacco products in violation of the code.

Initial TRL enforcement efforts began in September 2025, with inspections conducted for all known retailers who did not obtain a required TRL license. This first enforcement phase included visits to 54 potential unlicensed retailers, after which it was discovered that 18 were operating in violation of the VMC. Reinspections were conducted in December, and of those 18 only 10 were found to still be in violation . During December inspections, Cease & Desist letters were issued to the 10 remaining violators. Follow-up enforcement for the non -compliant retailers is currently active and ongoing and expected to continue into 2026.
o Sidewalk Vending, Peddling & Solicitation Enforcement The ‘Sidewalk Vending, Peddling, and Solicitation ’ enforcement program was also established in early 2025, to regulate sidewalk vendors, roaming and stationary vending activities, peddlers, and solicitors operating within the city on public rights-of-way (ROW) only. This program was originally intended to be run by Public Works; however, Code Enforcement and Planning have taken the lead on implementation and enforcement. Implementation activities during 2025 were limited to education and public outreach onl y (due to limited staffing and various staffing transitions). No citations were issued in 2025; however, a new citation process is in development and enforcement efforts are expected to increase in 2026 in coordination with Solano County Environmental Health Department.

10 PDS 2025 Year End Summary
February 2026

o Vacant Real Property Registration Program
In 2013, the City established a vacant residential building registration program to monitor and enforce certain property maintenance standards, as a way of reducing and preventing vacant building-related blight. In 2020, the program was expanded to include vacant lots and vacant commercial buildings (and is now known as the “Vacant Real Property Registration Program”); however, after the approved expansion, only the vacant lot portion of the program was immediately implemented. In the most recent previous years (including 2022, 2023 & 2024), the overall program was not consistently tracked/maintained due to insufficient staffing.

Over this past year, as staffing levels began to
rebound, program monitoring was ramped up and
implementation of the vacant commercial building
portion of the 2020 ordinance officially began.

During the 2025 calendar year, a total of 241 vacant
building registrations (including both residential and
commercial) were opened, and 92 vacant lot
registrations were opened, totaling 333 new
properties in the program (which is double the
number of new registrations from 2024).

During the second half of 2025, the program was audited internally to clear up past registrants that were not consistently tracked. This work resulted in a total new active program participant count of 346 properties as of the end of 2025, and annual renewal notices were sent out to all 346 participants before the end of December (registration renewal payments expected to be received in the first quarter of 2026).

It should be noted, that following the internal audit done in 2025, the program is expected to continue with consistent tracking of regular annual renewals; however, monthly monitoring tracking activities will be done as time permits throughout the year, unless additional staffing support is authorized as requested during the mid-year budget process.

11 PDS 2025 Year End Summary
February 2026
o Public Meeting Attendance/Participation
An important component of the Code Enforcement Officer’s role is being accessible and visible to the public, engaging with the community (both residents and the business community), and being able to respond to questions/concerns in a timely manner. One way to achieve this is through regular public meeting participation, which is a metric that the Division started tracking in 2025. As shown in the table below, during the 2025 calendar year, Code Enforcement Officers were able to attend/participate in a total of 30 public meetings. *Other Events Include:
**Neighborhood Watch & Business Watch meetings were consolidated in December 3/18/25, TRL Workshop #1
4/15/25, TRL Workshop #2
5/14/25, PDS Citizens Academy
6/6/25, Sidewalk Vendor Education/Enforcement
w/ Solano County Environmental Health Team
6/7/25, Special Neighborhood Meeting re: Problem Business 6/11/25, Tobacco Retailer Educational Visits (joint outreach with LGBTQ Minus Tobacco group)
6/17/25, Sidewalk Vendor Program Workshop
10/7/25, National Night Out (8 Code Enforcement Staff
Members Participated)

12 PDS 2025 Year End Summary
February 2026
III. Building Division
The table below shows a year end comparison of various building permit activity totals for 2025, compared to the previous year.

During 2025, the Building Division issued a total of 3,705 permits (which is an average of 309 permits per month) and 11,430 inspections were completed (average of 952 inspections per month). The ‘monthly average’ numbers for these activities provide insight into the regular volume of work being done within the division.

While the total permit count for 2025 (3,705 issued permits) is slightly lower than the 2024 total (4,116 issued permits), it should be noted that the total job valuation for those permits was much higher in 2025, and the total fees collected was significantly higher was well (over $1 million more collected than in 2024).

Total Solar and Accessory Dwelling Unit (ADU) permits issued were also down from 2024, even though staff took additional efforts to streamline processes for both permit types. Streamlining activities in 2025 included:

Permit Activity Types 2024

YEAR END TOTALS
2025

YEAR END TOTALS

OVERALL (TOTAL) BUILDING PERMITS
ISSUED 4,116 3,705
SINGLE-FAMILY PERMITS ISSUED 1,292 1,190
SINGLE-FAMILY PERMITS FINALED 989 971
ADU PERMITS ISSUED 62 30
SOLAR PERMITS ISSUED 932 783
TOTAL FEES COLLECTED (For Issued
Permits) $6,407,534 $7,590,018
JOB VALUATION ISSUED $123,584,690 $175,993,238
INSPECTIONS COMPLETED 7,850 11,430

13 PDS 2025 Year End Summary
February 2026
• Continued advertising for instant solar permitting on the City’s website. • Publishing of a new ADU mini-guide for homeowners to help them plan, design, and build an ADU or JADU on their property. The guide includes step-by-step instructions to navigate the ADU process; key design and permitting tips; overview of local rules, fees, and timelines; and links to helpful tools and financing resources. The mini-guide is available on the Planning Division website and has been promoted in the Vallejo Weekly newsletter.

In addition, the table below includes a monthly breakdown of the residential permit activity subset of the ‘total permits issued’ which is specific to single family residential permit activity, as well as newly constructed ADU’s.

0 20
40 60
80 100
120
140
Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 OCT. 2025 NOV. 2025 DEC. 2025 Total Residential Permits Issued/Finaled, by Month (2025) Single Family Permits Single Family Permits FINALED ADU Permits

14 PDS 2025 Year End Summary
February 2026
IV. Planning Division
Current Planning Activities:

During 2025, the Current Planning Division received a total of 316 new project applications (including all application types), and during this same period, staff issued 315 approvals, which is up from the previous year (196 projects approved in 2024). The table below shows a breakdown of activity by month.

The table on the right provides a
further breakdown of the total
applications received/approved
within each City Council District to
provide some added insight as to
where most of the development
activity is occurring.

15 PDS 2025 Year End Summary
February 2026
Some noteworthy planning project approvals that occurred issued during 2025, included:
• Zoning Code Language Clean Up – Phase 1 (CC 1/7/25)
• Wise Auto Complex - Hyundai Dealership at 500 Redwood (PC 1/22/25) • Two new single-family homes approved within the St. Vincents Historic District (AHLC, 1/16/25 & 2/20/25) • Sky Zone (PC 3/3/25)
• Warren Avenue General Plan Amendment/Rezoning (CC 6/24/25) • Rollingwood Subdivision, 131 new single-family homes (PC 11/3/25) • 71 Tobacco Retail License (TRL) applications were received, reviewed and approved (March – July 2025) • 9 Cannabis renewal applications were received and 7 were approved (June 2025) For the full current project pipeline list, please see the attached ‘Vallejo Land Use Entitlement’ (VALUE) List. The VALUE list is available online and it is updated quarterly with project status information for all noteworthy planning projects that are either currently in review or recently approved.
o Mills Act
There are currently 19 active Mills Act contracts for historic properties within the City of Vallejo. No new Mills Act contract applications were received in 2025. However, during this past year Planning staff initiated a new annual auditing process to better track Mills Act compliance. Existing contract holders were notified of the new process in mid-2025, and in December 2025, formal audit letters were sent to all 19 active contracts, with responses due during the first quarter of 2026.

16 PDS 2025 Year End Summary
February 2026
o Affordable Housing Production Status (6th Cycle RHNA, 2023-2031) The following Vallejo 2025 housing production activity (between 1/1/2025 and 12/31/2025), will be shared with the California Department of Housing and Community Development (HCD) and the Office of Land Use and Climate Innovation (LCI) by April 1, 2026.

Approved Entitlements: 36 units
14 units Extremely Low-Income (Deed Restricted)
1 unit Extremely Low-Income (Non-Deed Restricted)
5 units Very Low-Income (Non-Deed Restricted)
7 units Low-Income (Non-Deed Restricted)
4 units Moderate-Income (Non-Deed Restricted)
5 units Above Moderate-Income

Building Permit Issued: 193 units*
7 units Very Low-Income (Non-Deed Restricted)
24 units Low-Income (Deed Restricted)
9 units Low-Income (Non-Deed Restricted)
10 units Moderate-Income (Non-Deed Restricted)
143 units Above Moderate-Income

Inspections Finaled/Certificate of Occupancy Issued: 117 units 48 units Extremely Low-Income (Deed Restricted)
9 units Very Low-Income (Non-Deed Restricted)
8 units Low-Income (Non-Deed Restricted)
12 units Moderate-Income (Non-Deed Restricted)
40 Above Moderate-Income

*The building permits issued number (193) counts toward the City’s RHNA Allocation. It should be noted that 193 units is 184% more than the 68 units reported in 2024. 193 units is also the highest amount Vallejo has reported so far for the 6th

17 PDS 2025 Year End Summary
February 2026
Cycle (2023-2031). With the 193 units from 2025, the City has counted a total of 530 units towards its 6th Cycle RHNA allocation of 2,900 units. See the table below for a detailed breakdown.

Long-Range Planning Activities:

o Downtown & Waterfront Specific Plans

These two projects involve comprehensive updates to the 2005 Downtown Vallejo Specific Plan (DVSP) and the 2005 Vallejo Waterfront Planned Development Master Plan (WPDMP) and Design Guidelines. These specific plan updates are fully grant funded and are intended to address land use, mobility, infrastructure, housing, equity, economic development, and environmental sustainability for these two very important planning areas in compliance with state statutes, CEQA, and MTC’s Transit-Oriented Communities (TOC) Policy. At buildout, the DVSP planning area is likely to accommodate approximately 1,100 new housing units, and the WPDMP planning area is likely to accommodate approximately 2,300 new housing units.

During 2025, the City executed all required master funding agreements for the $2.4 million in grant funds forthcoming, and staff drafted Request for Proposals (RFPs) to solicit consultant teams to lead the work for both plan updates. The

18 PDS 2025 Year End Summary
February 2026
RFPs were released on October 27, 2025, and in December 2025, the city received proposals from seven well qualified firms. It is expected that consultant selections will be made by mid-March, and consultant agreements will go to City Council for consideration in early April 2026.

o Housing Element Program F 1.1.3 – Renter Protections and Housing Stability

During 2025, the City advanced implementation of Program F 1.1.3 through modification of the two previously secured One Bay Area Grants (OBAG 3) totaling approximately $2.4 million, to update the Downtown Vallejo and Waterfront Specific Plans (see above for more details on those plans). The grant adjustments authorized in 2025, will allow for initial consultant-led tasks to include city-wide community engagement and feasibility analysis work in support of potential renter protection provisions and housing stability policies. The feasibility analysis and community engagement work (planned to begin by May 2026) will inform the draft ordinances, which will be prepared separate from the Specific Plan process and which will incorporate a suite of potential anti-displacement policies including rent stabilization, just-cause eviction protections, tenant anti-harassment measures, and tenant right to counsel provisions, as detailed by Housing Element Program F 1.1.3. Although the initial timeframe for the first phase of this work (including “rent stabilization and just cause for eviction protections ordinances”) has not been met, the City does have a plan to complete the work during the 2026 calendar year.

o Mare Island Specific Plan & DDA Status

 Mare Island Company (MIC) North Mare Island Disposition and Development Agreement (DDA)

The Draft Mare Island Specific Plan (MISP) was submitted to the City in October 2024 (on schedule), and staff completed a preliminary review in April 2025, resulting in an initial set of City comments. The City retained the Good City Company to conduct a peer review of the Specific Plan and to expand upon the City’s preliminary comments based on its independent technical analysis. The City transmitted its formal comment letter to Mare Island Company on February 7, 2026, along with a request for preparation of a second draft MISP.

Separately, the City retained Stantec to prepare the Environmental Impact Report (EIR), including any additional environmental documentation required under the National Environmental Policy Act (NEPA). The environmental

19 PDS 2025 Year End Summary
February 2026
review process is advancing, with release of the Notice of Preparation (NOP) anticipated in August 2026, followed by a public scoping meeting.

 Beautification Plan

MIC submitted preliminary plan to City in June 2023, and then detailed design drawings in April 2024. Comments were submitted to MIC on the drawings, and the plans were resubmitted thereafter. The second plan review is still pending and is expected to be approved in Q2 2026, in a phased manner subject to timing of completion of remaining Navy cleanup project on North Mare Island.

 Connolly Corridor

MIC submitted a Preliminary Review application to the city for Phase 1 in September 2024. Phase I includes a mix of food and beverage, retail, and open space along the waterfront promenade and coal sheds area. Challenges with Vallejo Flood and Waste District are currently being worked on to ensure the project can move forward successfully.

o General Plan Amendments to Address Environmental Justice (EJ)

This work is intended to facilitate integration of EJ policies and actions into the overall General Plan, in compliance with Senate Bill (SB) 1000, which requires cities to address the needs of disadvantaged communities by promoting equitable access to resources, improving public health outcomes, and reducing environmental burdens. Work on this project initially began in early 2022, but was stalled in 2024, in order to reallocate staffing resources for completion of the required Housing Element Update. During 2025, the project was picked up again and a full administrative draft of the proposed General Plan amendments has been completed and is currently undergoing internal review by City Staff. Next steps include finalizing the administrative draft and then releasing for a 30- to 45-day public review period, before taking the items to Planning Commission and City Council for consideration.

20 PDS 2025 Year End Summary
February 2026
o Inclusionary Housing Ordinance & Commercial Linkage Fee

This exploratory project began in 2023, to evaluate the feasibility of adopting an inclusionary housing ordinance and/or commercial linkage fee in Vallejo, including an analysis of in-lieu fee options. The study was conducted as required by Housing Element Program B 2.1.1, to assess market conditions, development economics, and policy alternatives to determine appropriate inclusionary requirements and fee structures that could support affordable housing production while maintaining development viability. The initial findings of the study indicated that such policies would negatively impact development viability, and as such, the work was placed on hold. In 2025, the work was picked up again and the analyses were refreshed. Unfortunately, the findings related to feasibility were unchanged.

In July 2025, and again in November 2025, Staff presented the preliminary findings of the consultant prepared studies to both the Planning Commission and the City Council. The studies concluded that the development prototypes analyzed are not currently financially feasible, even prior to the application of affordability requirements or additional impact fees.

At the November 24, 2025, joint meeting, the Planning Commission and City Council directed staff to proceed with drafting ordinances to establish inclusionary housing requirements and a commercial linkage fee. Since December 2025, staff has been working directly with the City Attorney’s Office to review inclusionary housing regulations from other jurisdictions and begin drafting an ordinance with policy options for future consideration by the Planning Commission and City Council. Staff anticipates this work to be completed during the second half of 2026, with a draft ordinance presented to decision makers by the fourth quarter of 2026.

o Other Updates

During 2025, long-range Planning Staff continued to participate in a variety of regional planning initiatives, including:

 Solano Bayshore Resilience Project
 Solano County Agricultural Initiative
 Solano-Napa North Bay Passenger Rail Feasibility Study  WETA & City of Vallejo Ferry Terminal Action Plan
 MTC Priority Conservation Area Reviews

21 PDS 2025 Year End Summary
February 2026
For the full list of Long-Range Planning projects in progress, please see the attached ‘Long-Range’ VALUE List which is available online and updated quarterly with the latest project status information for all noteworthy long-range planning projects/initiatives.

Lastly, metrics related to the total number of public meetings held by the Planning staff during 2025, have been tracked and are included below:
*Other Public Workshops Include:
3/18/25, TRL Workshop #1
4/15/25, TRL Workshop #2
5/14/25, PDS Citizens Academy
Presentation
6/5/25, Mare Island Specific Plan Community Meeting
6/17/25, Sidewalk Vendor Program Workshop
7/6/25, Joint CC/PC Inclusionary Housing Study Session (Pt 1) 11/24/25, Joint CC/PC Inclusionary Housing Study Session (Pt 2)

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1/26/26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Commercial Liquor Store
Relocation
Roberto Cortez -
Monarch Engineers
2168 Springs Road
(APN:0069-175-240) 1
UP22-0007
VAR24-0001
LR24-0013
EXC24-0006
Relocating an existing liquor store to a new tenant space in a new parcel. N/A Approved
PC:12/18/24 (Approved)
CC: 2/25/25 (Approved
on Appeal)
Cesar Orozco
Commercial Raising Canes Raising Cane's
Restaruant , LLC
Admiral Callaghan Ln &
Turner Parkway
(APN:0081-490-010) 1
MJP24-0001
DVR24-0007
DR24-0004
LR24-0007
ZC24-0021
ZC24-0022
ZC24-0023
New 2,691 square-foot restaurant with an attached 708 square- foot covered patio area, a 735 square-foot drive-through canopy for double drive-through lanes, and a 525 square-foot trash enclosure, 1,456 square feet of new landscaping, a new trash enclosure, new lighting throughout, American Disabilities Act (ADA) paths from the parking lot to the building entry points, three short-term bicycle parking racks, and a total of 21 off-street parking spaces
4,659 square feet Approved PC: 9/4/2024
(Approved) Cesar Orozco
Commercial Sky Zone Ryan Bickings 105 Plaza Drive #107
(APN:0081-570-120) 1 MJP24-0004 The proposed project consist of an indoor playground and tampoline park within an existing vacant tenant space. The N/A Approved Under Construction PC: 3/3/25 (Approved) Robby Thacker
Commercial Fairview at Northgate
Tentative Map Kier + Wright
Corner of Admiral
Callaghan Lane and
Turner Parkway
1 TM24-0003
Original parcel map subdivided the site into three parcels.

Costco, retail and residential parcel. Tentative Map to subdivide retail parcel number two into three parcels.

N/A Under Review PC: 2/18/26 (Tentative) Robert Busick
Commercial Master Sign Program Arrow Sign Company 1176 Admiral Callaghan Lane 1 PLN25-0099 The project consists of a Master Sign Program and a Variance to install a 20-foot pylon sign and a 10-foot monument signs. N/A Incomplete PC: TBD Robert Busick Commercial La Quinta Inn & SuitesDynamic Hospitality,
LLC
Vacant lot on Sonoma
Blvd. near Mini Drive
(APN: 0067-140-070)
2 SD20-0010
PM20-0002
DR24-0014
LR24-0003
PM20-0002
Approximately 49,741-square-foot, four-story hotel, which would include 96 guest rooms and onsite guest amenities, including an outdoor swimming pool, fitness room, bar, a dining room and community gathering areas
49,741 square feet Withdrawn N/A Robby Thacker
Commercial Chick Fil A LRG Investors JSR,
LLC - Ryan Nickleson
Sonoma Blvd South of
Mini Drive
(APN:0067-140-200)
2 UP22-0005
DR22-0007
DVR22-0013
DR22-0007
LR22-0003
A new 4,947 square-foot restaurant with three drive-through lanes with onsite improvements including 16,331 square feet of new landscaping, a new trash enclosure, new lighting throughout the site, American Disabilities Act (ADA) paths from the parking lot, six short-term bicycle parking racks, four long-term bicycle parking storage spaces and a total of 81 off-street parking spaces.
4,997 square feet Approved PC:11/13/23
(APPROVED) Cesar Orozco
1 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Commercial Surf Thru Carwash Ramirez Land
Planning
Vacant lot on Sonoma
Blvd. near Mini Drive
(APN: 0067-140-070)
2 PLN25-0054
The project consists of a Minor Use Permit, Development Review, Design Review, Landscape Review, Parcel Map and Sign Permit for the subdivision of a 10.86-acre parcel into two parcels. Parcel 1 will be 1-acrea with a 5,073 square-foot carwash, 1,242 square- foot carwash canopy, 3,994 square-foot solar vacuum canopys. 10,309 square feet Incomplete PC: TBD Robby Thacker
Commercial Federal Building Event
Center Elin Delgadillo 823 Marin Street
(APN:0056-161-040) 4
UP18-0002
COA23-0005
PLN25-0103
Establishment of an event center and reduction of off street parking. N/A Under Review PC &AHLC: 1/29/26
(Tentative) Laura Solomon
Commercial
Panda Express
Restaurant with Drive
Thru
Lusis Guzman - Gary
Wang
4301 Sonoma Blvd
(APN0051-250-680) 4
UP22-0004
DR22-0006
DVR22-0012
LR22-0002
EXC22-0011
A new 2,700-square-foot restaurant with a drive-through for Panda Expres. Site improvements are being proposed throughout the site to include 15,484 square-feet of landscaping, outdoor seating, a new trash enclosure, new lighting, American
Disabilities Act (ADA) paths from the parking lot to the building, three short-term bicycle parking racks, two long-term bicycle storage spaces and a total of 33 off-street parking spaces, including two ADA parking spaces.
2,700 square feet Finaled - Opened for
Business
PC: 9/4/2024
(Approved) Cesar Orozco
Commercial New Auto DealershipsGeorge Allen - Wise
Auto Gruop
500 Redwood Street
(APN:0051-010-320) 4
DVR23-0032
DR23-0014
EXC24-0005
MUP23-0014
PM23-0004
VAR23-0003
Project consists of a subdivision of an existing 12.45 vacant parcel into three parcels (Parcel A at 4.46 acres, Parcel B at 4.17 acres, and Parcel C at 3.64 acres), and the development on the new Parcel B of a 24,963 square-foot auto dealership with a 1,437 square-foot car wash for the Hyundai automotive brand.

The project also includes a total of 37,792 square feet of new landscaping, frontage improvements along Sonoma Boulevard, and 199 off-street parking spaces for customers, employees and vehicle storage.
26,400 square feet Approved PC:1/22/25
(Approved)
Laura Solomon
2 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Commercial Coal Sheds
Improvements
Reece Jatava - Mare
Island Company
850 Nimitz Avenue
(APN:0066-050-120) 4 PR24-0006
Preliminary Review of the Coal Sheds out on Mare Island forfaçade removal and replacement to City Landmark structures, new outdoor paving, flexible landscaping in pots, and signage.

N/A Preliminary Review N/A Laura Solomon
Commercial Blue Wave Express
Carwash
BW Sonoma Vallejo,
LLC.
4375 Sonoma Blvd.
(APN: 0051-250-460) 4
DVR24-0006
DR24-0003
LR24-0006
MUP24-0003
ZC24-0020
Project consists of a new 4,456 square-foot express carwash, with a 3,232 square-foot covered vacuum bays and a 1,050 square-foot covered pay station, with on site and off site improvements.
8,738 square feet Complete PC: TBD Julliette Avila
Commercial ABC License for
Quarter Cafe Keith Seabury 1015 Walnut Avenue
(APN:0066-050-170) 4 MJP24-0006 Request to add Type 20 (off-site sales of beer and wine) ABC license for Quarter's Cafe. N/A Approved PC: 3/17/2025
(Approved)
Robby Thacker
Commercial Waterfront
Commercial
Himstra Properties,
Inc. dba. Napa River
Realty
913 Wilson Avenue 4
DVR22-0019
DR22-0008
LR22-0006
LLA23-0001
2,020 square-foot sales office with two tiny home park model RVs on cement pads for sales offices. 2,020 square feet Complete PC: TBD Cesar Orozco Commercial Jack in the Box -
Remodel
Greg Borchardt PM
Design Group, Inc.
400 Broadway
(APN:0056-062-190) 5 PLN25-0030 The project consists of an exterior modification to the facade of the existing Jack In the Box. N/A Approved - 7/31/2025
(Director Level) N/A Laura Solomon
Commercial El Barbas El Barbas Resturant
and Bar
444 Broadway
(APN:0056-062-220) 5 PLN25-0061 Project consists of the legalization of the installation of sign, additions without the benifit of permits. N/A Incomplete N/A Donna Baarsch Commercial Child Start and First 5
Solano Facility
Juan Cisneros - Child
Start Inc.
1450 Colonel Avenue
(APN:0074-195-010) 6 DVR24-0024
LR24-0017
Project consists of a new surface parking lot containing 67 spaces with a new driveway access from Cbrillo Avenue and Expansion of an existing parking lot from 30 to 46 spaces with an existing access from Cornel Avenue; total of 113 off-street spaces.

N/A
Approved - 3/17/25
(Director Level)
Under Construction
N/A Cesar Orozco
Commercial 7-11 Gas Station Erin Jackson - EJ
Group
Vacant Site off Georgia
Street
(APN:0071-142-510)
6 PLN25-0116
The project consists of a Zoning Map Amendment, Major Use Permit, Development Review, Design Review, Landscape Review and a Sign Permit to construct a 3,940 square-foot conveinece store with eight-pump fuel station. The applicant has requested 24-hour operations, off-site beer and wine sales, and zoning map 3,940 square feet Under Review PC: TBD
CC: TBD Robby Thacker
3 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Commercial 24-Hour Planet
Fitness
Andrew Davies - EKN
Engineering
42 Springstowne
Center
(APN:0071-061-460)
6 PLN25-0098 The project consists of a Major Use Permit for 24-hour operation for a Planet Fitness N/A Approved PC: 10/20/2025 Donna Baarsch Commercial Burger King RemodelBrandy Yamamoto -
BJY Arch
1 Mariposa Street
(APN:0057-123-190) 5 PLN25-0216 The project consists of exterior remodel to the facade of the existing Burger King N/A Under Review N/A Julliette Avila Commercial Wine Bar Erin Conner - Tierney
Conner Architecture
337 Georgiua Street
(APN:0056-192-050 4 PLN25-0220
The project consists of the establishment of a wine bar occupying 2,129 square feet on the first floor at 337 Georgia Street. Hours of operation are proposed from 4 PM- 9 PM on Wednesday and Thursday; 4 PM – 10 PM on Friday; and
Saturday and Sunday from 10 AM to 3 PM; 5 PM-10 PM.

N/A Under Review N/A Juliette Avila
Commercial All Soul's Cemetery Scott F. Miller 550 Glen Cove Road (APN:0079-120-260) 3 PLN25-0217
The project consists of a new 26,509 square foot building to function as a combined funeral home, funeral service, and office building for the All Souls Cemetery. The proposed building is located near the southeast corner of the cemetery parcel close to I-780 and includes a surface parking lot with surrounding landscape improvements, as well as one additional access driveway along Benicia Road. A Zoning Code Text Amendment to Table 16.301-A within Vallejo Municipal Code is required to permit funeral and interment services within the Public and Semi-Public (PS) zoning district. A Major Use Permit is required for operation of a cemetery within the PS zoning district. 26,509 square feet Incomplere DRB: TBD
PC: TBD
CC: TBD
Robert Busick
Industrial Concrete batch PlantSidhu Balwinder Kaur 1888 Broadway St (APN:0052-090-210) 4 SD19-0004 Legalize unpermitted concrete batch plant. N/A Under Review PC: TBD Cesar Orozco Industrial Fairgrounds Self
Storage
Ryan Nickelson - LRG
Investors, LLC
384 Fairgrounds Dr.
(APN:0052-320-280) 4
SD19-0008
MJP19-0008
VAR19-0001
LR19-0002
SP19-0022
Project consists of a self-storage facility involving 1,117 storage units, three buildings, and a total building area of 106,360 square feet and associated site improvements. The building breakdown is as follows: Storage Building A (78,850 square feet), Storage Building B (25,150 square feet), and Manager’s Building (2,360 square feet).
106,360 square feet Completed - Open for
Buisness
PC: 5/18/20
(Approved) Cesar Orozco
4 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Industrial DXD Self-Storage Scott Hughes - DXD
SS F2, LLC
1609 Lewis Brown
Drive
(APN:0052-040-530, -
140,
4 PLN25-0027
The project consists of demolishing two single-level commercial buildings totaling 28,260 square-feet and constructing a four- story, 138,161 square-foot climate controlled self-storage facility. The building will have an overall building height of 49 feet.

On-site improvements such as off-street parking, long and short- term bicycle parking and landscaping throughout the site is proposed. Off-site improvements include new sidewalk, curb and gutter, and a new driveway.
138,161 square feet Under Review
DRB: 10/9/2025 -
Recommended to PC
with 3-0 vote.

PC: TBD
Robert Busick
Industrial Mare Island Dry Dock
1 Wendy Rocha - Foth 1024 Nimitz Avenue 4 PLN25-0211
The proposed project consists of the recommissioning of Dry Dock 1 on Mare Island. This project will expand their services and provide repairs to a variety of marine vessels and include the installation of view fencing for public access.

N/A Incomplete AHLC: TBD Laura Solomon
Industrial Recology - Process of
Solid Waste Recology Vallejo 2021 Broadway
(APN:0067-150-260) 2 PLN25-0230
The proposed project is an application for a Major Use Permit to allow the receipt, processing, and transfer
of Municipal Solid Waste (MSW). Vehicles delivering MSW to the site would enter through the main
driveway and tip the material on the floor of the existing recycling building. MSW would either be
processed, mechanically or by hand, to recover recyclable materials, or placed in transfer trucks for
transport and disposal at a permitted disposal facility or landfill.

All MSW handling would occur inside the
building. The proposed project would not increase or change the hazardous materials, including BOPA and e-waste, that are currently processed at the Facility.

N/A Incomplete PC: TBD Donna Baarsch
Mixed Use Fairview at Northgate
(Costco)
Vallejo-Fairview
Developers, LLC
Admiral Callaghan
Ln./Turner Pkwy.
(Cooke Property)
(APN:0081-490-010)
1 PR22-0018
PD17-0007
TM17-0002
ZMA17-0001
UP18-0007
153k sq. ft. Costco, 4 retail pads, 178 small-lot SFDs (proposed amendment to develop a 157,417 sq. ft. Costco, modifications to stormwater features, the layout of gas station aisles/pumps, and changes to building pad elevations )
179,688 square feet
178 single-family Under Construction CC:6/9/2020
(Approved) Cesar Orozco
5 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Mixed Use Solano Ranch Mixed-
Use Project
Vincent Butler - Lake
Street Ventures
Columbus Pkwy. at
Admiral Callaghan Ln.
(APN:0182-020-010, -
020 and -080)
1 PD21-0001
ME21-0001
LR21-0001
CTA21-0001
GPA20-0001
SP21-0001
Mixed-use development on vacant 32-acre site at the
intersection of Columbus Pkwy. and Admiral Callaghan Ln. The project includes 264 apartment units, 4 commercial buildings totaling 32,725 sq. ft., 11 acres of wetland/open space 32,725 square feet
264 multi-units Hold - by applicant DRB: June 13
PC: TBD Robby Thacker
Mixed Use
149.1-acre Solano
County Fairgrounds
site
Solano County Solano 360 1 PR22-0005 Preliminary review for Solano 360 Preliminary Review N/A Cesar Orozco Public and Semi-
Public
Turo University Guard
House
Jennifer Levesque -
Twin Steps
Architecture
1310 Club Drive
(APN:0052-130-050) 4
COA24-0004
DVR24-0029
DR24-0013
Project consists of a 340 square feet guard house for Turo University and proposed on-site and off-site improvements. 340 square feet Approved AHLC: 11/20/2025 Robert Busick Public and Semi-
Public Truett Hall RenovationNewman J. Hoffman -
Turo University
251 Moore Street
(APN: 0066-170-010) 4 COA21-0001 Construct a new exterior stairway and replace windows on historic structure. N/A Building Permit Finaled AHLC: 11/17/22 (Approved) David Storer
Public and Semi-
Public PD Building City of Vallejo 111 Amador Street
(APN:0056-216-080) 5 PLN25-0021 The project consists of demolishing existing police station and construction a new facility. 89,025 square feet Under Review PC: TBD Cesar Orozco Residential Blue Rock Springs Greg Norman
Company 655 Columbus Pkwy. 1 PR19-0002 500-600 lot residential subdivision & 18-hole golf course 600-units Preliminary Review N/A Gillian Hayes 6 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Residential Fairview at Northgate
Housing
Vallejo-Fairview
Developers, LLC
Admiral Callaghan
Ln./Turner Pkwy.
(Cooke Property)
(APN:0081-490-010)
1 TM24-0002
DVR24-0021
DR24-0008
LR24-0015
PD24-0002
Fairview at Northgate - Residential Amendment - The project consist of amending the residential component of the the Fairview at Northgate Master Plan. The proposal consists of a total of 245-units; 119 detached single-family residences and 126 cluster type single-familyy detached homes. The area includes a neighborhood park, linear apark and dog park. 245-units Under Review PC: TBD
CC: TBD Cesar Orozco
Residential Gateway Apartments Russell Square
Consulting, LLC
5180 Sonoma Blvd
(APN:0067-150-280) 2
DVR21-0021
DR21-0005
LR21-0009
Project Consists demolition of an existing vacant commercial building and construction of 343 dwelling units distributed across 9 buildings and one central amenity building. The project also includes site improvements such as 105,959 square feet of new landscaping, new lighting throughout the site, pedestrian paths along the new buildings, short-term bicycle racks and a total of 698 new off-street parking spaces.
343-units Approved PC: 11/6/2023
(Approved) Cesar Orozco
Residential Permanent Supportive
Housing
Taryn Sandulyak - Firm
Foundation
2441 Broadway
(APN: 0067-140-150) 2 DVR22-0022 Permanent supportive housing for 47 individuals and provide various on-site services for people experiencing homelessness. 47-units Completed - Open for Buisness N/A Cesar Orozco
Residential Bordges Ranch Braxton Warren 0068-570-100 2 PR24-0005 Preliminary Review for a 418-unit subdivision with affordable housing 418-units Preliminary Review N/A Cesar Orozco
Residential Jamella Court
Subdivision Blueacres, LLC Jamella Court
(APN:0068-580-120) 2 PLN25-0043 Preliminary review for 22 detached single-family residences on a previously recorded tentative map 22-units Preliminary Review TPRC: 4/17/25 Robby Thacker Residential Borges Ranch
(Formal Submittal) Allen Warren
Vacant Site off Borges
Lane
(APN:0068-570-010, -
020, -030, -040, -050, -
060, -070, -080, -090,
and -100)
2 PLN25-0089
The project consists of a Tentative Map, Development Review, Design Review, Hillside Development, and Landscape Review to subdivide a 122-acre parcel into 398 residential lots, including 68 deed restericted affordable units, open space and a community park.
395-units Under Review DRB: TBD
PC: TBD Cesar Orozco
Residential Waterstone Phase
2A/2B Tri Pointe Homes APN:0082-010-260 3 DVR22-0002 185 single-family homes for Waterstone Phase 2A/2B 185-units (Market Rate) Under Construction N/A Cesar Orozco Residential Vista Cove Adam Smith -
Sancerra LLC.

NE corner Shady Ln
and Wildflower St.

APN: 0079-171-170
3 DVR23-0017
DR23-0006
LR23-0002
MUP23-0010
TM23-0001
PD24-0001
Proposed development for 51 single-family dwelling units. 51-units Under Review DRB: July 10, 2025
(Recommended to PC)
PC:TBD
CC: TBD
Cesar Orozco
7 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Residential Vista La Terraza Caleb Esborg - MDC
Builders, Inc. 1390 Eucalyptus Drive 3 SB24-0002 SB330 application for 15 market rate units 15-units Preliminary Review N/A Laura Solomon Residential Vallejo Broadway
Housing Redwood Residential 1765 Broadway
APN:0052-160-100 4
DVR23-0005
DR23-0004
MUP23-0001
LR23-0001
ZC23-0007
LLA23-0002
111- multi-family residential project on approximately 4-acre site with a leasing office/community room. Two parcles will be mereged together.
111-units Approved
DRB: 5/9/2024
(Recommended to PC)
PC: 9/4/2024
(Approved)
Cesar Orozco
Residential Senior to Affordable
Housing
Welltower Cogir
Landlord, LP
2261 Tuolumne Street
APN:0052-330-080 4 DVR24-0031
AB2011 and Density Bonus - conversion of an existing 24-unit independent living and 69-unit assisted living senior housing into a 93-unit affordable housing. `
93-units Approved - 7/14/25
(Ministerial) N/A Donna Baarsch
Residential SB-9 Lot Split MDRZ, Inc. 902 Kentucky Street (APN:0056-114-200) 5
DVR23-0028
DR23-0010
LR23-0028
PM23-0003
SB9 application. The project consists of subdividing an existing 6,500 square-foot lot into two 3,189 square-foot lots. Each lot will a two-story duplex, for a total of four units. Unit A and C will have a total area of 1,490 square feet and an attached two-car garage and Unit B and D will have a total building area of 1,070 square feet and an attached one car garage.
4-units Approved - 1/19/24
(Ministerial) N/A Cesar Orozco
Residential Alterations to existing
home Jean Drolet 602 Georgia Street
(APN:0056-201-200) 5 PLN25-0069
The project consists of a Certificate of Appropriantess and a Variance for an Expansion and renovation of an existing single- family residence, including: removal of two prior additions, false mansard-style roof, and other exterior features added in 1970s; an addition and a new driveway and basement for a garage/workshop.
1-unit
(Existing Residence) Under Review AHLC: 2/19/26
(Tentative) Robert Busick
Residential Porter Street Housing Klein Financial
Corporation
961 Porter Street
APN: 0061-160-180 6
DVR22-0046
DR22-0013
LR22-0010
Density Bonus Project: adding an additional 122 units to an existing apartment complex. 20 percent of the units will be for low income level. Request of nine waivers and one concession. 122-units
Approved - 8/21/23
Under Construction
PC: 8/21/23
(Approved) Cesar Orozco
Residential KB Home Rollingwood
Subdivision
KB Homes North Bay,
LLC
201 Rollingwood Drive
APN: 0072-170-050, -
060
6 DVR23-0042
DR23-0019
LR23-0013
MUP23-0019
TM23-0003
The project consists of a new subdivision with 138 new parcels, 130 single-family residence and a total of 8 parcels dedicated for bio-retention swells and open space.
130-units Approved
DRB: 12/12/2024
(APPROVED)
PC: November 3, 2025
(Approved)
Robby Thacker
Residential 14-unit Afforable
Housing project
Heather Chicoine -
Firm Foundation
1140 Fifth Street
APN:0062-070-090 6
DVR24-0035
DR24-0016
LR24-0022
Density Bonus/SB35 - 14-unit affordable housing project with onsite amenities and services 14-units Approved - 10/10/25 (Ministerial) N/A Robert Busick
8 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Residential Reis Ave. subdivision David Jacobson Off Reis Ave (APN:0074-110-500) 6 PLN25-0039
Preliminary Review consits of a 5-lot subdivision, featuring attached duplexes with 1,424 square feet of living area on each lot, as well as three detached Accessory Dwelling Units (ADUs) 13-units
(10SFR + 3ADUs) Preliminary Review N/A Julliete Avila
Residential Senior Affordable
Housing
Don Gilmore -
Community Housing
Capital
759 Sonoma Boulevard
(APN:0061-051-010, -
020, -030, -040, & -050
6 PLN25-0075
SB330: Preliminary Application - The project consists a new construction to provide 78 units for senior affordable housing.

SB35 - Letter of Intent submitted.
78-units Preliminary Review N/A Cesar Orozco
Residential Senior Affordable
Housing
Don Gilmore -
Community Housing
Capital
720 Sonoma Boulevard
(APN:0061-052-130) 6 PLN25-0076
SB330: Preliminary Application - The project consists a new construction to provide 20 units for senior affordable housing.

SB35 - Letter of Intent submitted.
20-units Preliminary Review N/A Cesar Orozco
Residential Senior Affordable
Housing
Don Gilmore -
Community Housing
Capital
720 and 759 Sonoma
Boulevard (APN:0061-
051-010, -020, -030, -
040, & -050 and 0061-
052-130)
6 PLN25-0196
SB35 and Density Bonus -The project consists of two new residential buildings containing affordable senior housing units located across Sonoma Blvd from each other. The first building located at 720 Sonoma Blvd proposes one 4-story building containing 20 residential units within 24,805 sq. ft. of buliding area and a 4,900 sq. ft. parking garage with 15 spaces accessed from Sonoma Blvd on a 12,000 sq. ft. (0.275 acre) parcel. The second building located at 759 Sonoma Blvd proposes one 6- story building containing 77 units and 1 management unit within 77,900 sq. ft. of building area and a 13,000 sq. ft. parking garage with 36 spaces accessed from McLane Street on a
30,000 sq. ft. (0.69 acre) site currently comprised of 5 parcels to be merged into one. Site improvements including landscape included on both sites.
98-units Incomplete N/A Robert Busick
Residential Commercial to
Residential
Thomas Biggs - Biggs
Group Architectrual
2315 Springs road
(APN:0071-062-240 6 PLN25-0183
The project consists of converting an existing two-story commercial building into residential units. Existing: three retail spaces on the ground flood and one residential unit on the second floor. Proposed: one retail space and two residential units on the ground floor and three residential units on the second floor.
5-units Incomplete N/A Robert Busick
9 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Updated 1ͬ26ͬ26
Project Type Project Name Applicant Address District
Number
Project
Number(s) Project Description
Unit Count or
Square Footage
(New
Construction)
Application Status Public Hearings
(Estimated) Project Manager
Residential SB-9: 2 Unit
Development Jimmie Zhou
Vacant Site off
Mississippi
(APN:0051-233-230)
4 PLN25-0229
The project consists of a 2-unit development on a vacant parcel off Mississippi Street. Each unit will have a total living area of 1,099 square feet with a 345 square-foot attached one-car garage.
2-units Incomplete N/A Robby Thacker
Residential Coral Sea Village Eric Olson - Lennar Coral Sea Village Circle 4 PLN25-0158 The project consists of the development of 75 vacant parcels off Flagship Drive into 68 detached single-family residences and seven fourplexes.
96-Units Complete N/A Robby Thacker
Residential SB-9: 2 Unit
Development Jimmie Zhou 240 Mississippi Street
(APN:0051-233-240) 4 PLN25-0187
The project consists of a 2-unit development on a vacant parcel off Mississippi Street. Each unit will have a total living area of 1,099 square feet with a 345 square-foot attached one-car garage.
2-units Incomplete N/A Julliete Avila
Residential Fairgrounds Multi-
Family
Jason Choo -
Fairgrounds Drive
Retail, LLC
1700 Fairgrounds
Drive
(APN:0068-131-120)
2 DVR23-0025
The project consists of a Multi-family residential development involving 42 apartment units on a 0.94-acre parcel of land. The project is a “by right project” filed pursuant to Senate Bill (SB) 35 (California Government Code Section 65913.4: Ministerial approval of infill affordable housing projects). The project also allocates 10 percent or five units for Low Income (50 to 80 percent of Area Median Income).
42-units Approved - 3/19/24
(Ministerial) N/A Cesar Orozco
Map Amendments Lincoln Road GP
Amendment Anwar Mizra Vacant site off Lincoln
Road East 6 PLN25-0067
The project consists of a General Plan Map Amendment to change the land use designation from Retail Entertainment to Business/Limited Residential.

N/A Under Review PC: TBD
CC: TBD Laura Solomon
10 VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes General Plan Annual Progress
Report for Calendar Year 2025
This is an annual report that the City is required to submit to the State of California. It tracks progress in implementing the General Plan, with a particular focus on the Housing Element, and includes updates on housing production, policy actions, and the City’s progress toward its planning goals. The APR must be reviewed by the Planning Commission and City
Council prior to submittal.

Annual Report City of Vallejo -
Planning and
Development
Services
Robert Busick,
Senior Planner
In Progress The APR is currently being completed and is tentatively scheduled for Planning Commission and City Council
review in March 2026. The APR will be submitted to the
Governor’s Office of Land Use and Climate Innovation
(LCI) and the California Department of Housing and
Community Development (HCD) by April 1, 2026.

Housing Element Program A

1.1.6 (Rezoning and
Redesignations to Maintain
Surplus Capacity for Lower
Income Units) Implementation
This project is an ordinance amending Title 16 ("Zoning") of the Vallejo Municipal Code to confirm “by right” development provisions for designated Housing Element sites, as required by State law to accommodate the City’s Regional Housing Needs Allocation (RHNA). The amendments would establish a minimum density of 20 dwelling units per acre and require residential-only development on the affected sites. This work implements Housing Element Program A 1.1.6.

Ordinance City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The Planning Commission considered the proposed ordinance on December 15, 2025, and continued the
item to January 21, 2026, to allow staff to meet with
affected property owners to clarify the ordinance’s intent and potential impacts on their properties.

Housing Element Program F

1.1.3 (Renter Protection and
Housing Stability Program)
Implementation
As part of the Downtown Vallejo Specific Plan (DVSP)
Update, the consultant team will prepare a citywide Anti- Displacement Strategy and conduct feasibility analyses for a range of policy tools, including rent stabilization, just cause eviction protections, tenant anti-harassment protections, and a tenant’s right to counsel. Draft ordinances will be prepared based on this analysis, with the aim of promoting housing stability, preventing involuntary displacement, and ensuring that Vallejo’s revitalization benefits all members of the community. This work implements Housing Element Program F 1.1.3.

Ordinances City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress See status for DVSP Update.

General Plan Amendments to
Address Environmental Justice
Requirements
This project will integrate environmental justice policies and actions into the overall General Plan, in compliance with Senate Bill (SB) 1000, which requires cities to address the needs of disadvantaged communities by promoting equitable access to resources, improving public health outcomes, and reducing environmental burdens.

General Plan
Amendment
City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The City contracted PlaceWorks to assist with preparation of the amendments. Staff has revised the
administrative draft GPAs prepared by PlaceWorks and
received comments from the City Attorney’s Office. Next steps include finalizing the administrative draft GPAs by addressing City Attorney's Office comments and
incorporating additional revisions, releasing the draft GPAs for a 30- to 45-day public review period, and
making any necessary revisions in response to public
input before bringing the amendments to the Planning
Commission and City Council for adoption.

General Plan Amendments to
Address Climate Adaptation,
Wildfire Risk, Flooding and Sea
Level Rise
This project will update the General Plan's Nature and Built Environment Chapter, in compliance with Government Code Section 65302(g), to incorporate climate adaptation and resilience strategies. These include a climate vulnerability assessment, wildfire risk reduction, extreme heat mitigation, and flood protection, along with related goals, policies, and implementation measures to safeguard the community from climate-related hazards.

General Plan
Amendment
City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
On Hold The City contracted PlaceWorks to assist with
preparation of the amendments. An initial draft has been submitted. Following adoption of the GPAs to address
EJ, staff will review and revise the administrative draft climate adaptation GPAs prepared by PlaceWorks, with
assistance from the City Attorney’s Office.

City of Vallejo 1 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Mare Island Specific Plan This project is a comprehensive update to the Mare Island Specific Plan (MISP), originally adopted by the Vallejo City Council in 1999. The draft specific plan submitted by the Mare Island Company in October 2024 envisions the
redevelopment of Mare Island into nine livable, connected, and diverse neighborhoods, each featuring a range of
development patterns and unique character inspired by the island’s history and ecology. The land use plan in the draft is estimated to generate up to 14,000 dwelling units and
between 14,900 and 17,000 jobs.

Specific Plan City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The City has reviewed the initial draft MISP and routed it internally for feedback. The City contracted with Stantec to prepare the Environmental Impact Report (EIR) and
any additional environmental review required under the
National Environmental Policy Act (NEPA). The City also contracted with the Good City Company to conduct a
comprehensive peer review of the draft Specific Plan.

Good City submitted an administrative draft comment
letter on December 4, 2025, which is currently under City review. Next steps include transmitting the comment
letter to Mare Island Company by February 2026 with a
request for a second draft MISP, providing a status
update on the planning process to City Council on March 24, 2026 (tentative), and releasing the EIR Notice of
Preparation thereafter. The Draft EIR is anticipated to be released for a 45-day public review period in
September/October 2026.

Downtown Vallejo Specific Plan
Update
This project is a comprehensive update to the Downtown
Vallejo Specific Plan (DVSP), originally adopted by the Vallejo City Council in 2005. This update is intended to develop a community-supported and implementable plan that addresses land use, mobility, infrastructure, housing, equity, economic development, and environmental sustainability. The process will build consensus through meaningful public
engagement, integrate market realities and infrastructure needs, and ensure full compliance with state statutes, the California Environmental Quality Act (CEQA), and the
Metropolitan Transportation Commission’s (MTC) Transit- Oriented Communities (TOC) Policy. At build out, the
planning area may accommodate about 1,100 new housing
units.

Specific Plan City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress In May 2025, the City executed master funding and supplemental agreements with MTC to enable
reimbursements under the One Bay Area Grant (OBAG)
program, and the City Council accepted the grant in
June 2025. In October 2025, the City released a
Request for Proposals (RFP) to solicit qualified
consultants for the specific plan update. In December
2025, the City received proposals from seven consultant teams. Next steps include reviewing and ranking the
proposals, interviewing finalist teams in early to mid- February 2026, and recommending a consultant team to
the City Council for contract approval, with the goal of executing an agreement and initiating the planning
process in spring 2026.

Vallejo Waterfront Specific PlanThis project is a specific plan that will replace the Vallejo Waterfront Planned Development Master Plan (WPDMP) and
Design Guidelines adopted by the Vallejo City
Council/Redevelopment Agency in 2005. The project is
intended to develop a community-supported and
implementable plan that addresses land use, mobility,
infrastructure, housing, equity, economic development, and environmental sustainability. The process will build consensus through meaningful public engagement, integrate market
realities and infrastructure needs, and ensure full compliance with state statutes, the California Environmental Quality Act (CEQA), and the Metropolitan Transportation Commission’s (MTC) Transit-Oriented Communities (TOC) Policy. At build out, the planning area may accommodate about 2,300 new
housing units.

Specific Plan City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress In May 2025, the City executed master funding and supplemental agreements with MTC to enable
reimbursements under the One Bay Area Grant (OBAG)
program, and the City Council accepted the grant in
June 2025. In October 2025, the City released a
Request for Proposals (RFP) to solicit qualified
consultants for the new specific plan. In December 2025, the City received proposals from seven consultant
teams. Next steps include reviewing and ranking the
proposals, interviewing finalist teams in early to mid- February 2026, and recommending a consultant team to
the City Council for contract approval, with the goal of executing an agreement and initiating the planning
process in spring 2026.

ADU Ordinance Update This project is an ordinance amending Chapter 16.303 ("Accessory Dwelling Units") of the Vallejo Municipal Code to comply with State ADU Law under Government Code
Sections 65852.2 and 65852.22, ensuring that local
regulations align with state requirements for both accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs).

Ordinance City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
On Hold The proposed municipal code amendments have been drafted and reviewed by the City Attorney’s Office.

Based on that review, the City Attorney’s Office has
determined that the ordinance will be re-drafted. Staff is continuing to work with the City Attorney’s Office to
finalize the ordinance and bring it forward to the
Planning Commission and City Council for consideration
and adoption.

City of Vallejo 2 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Vallejo Downtown/Waterfront
Parking Management Program
and Action Plan
This project, funded through a technical assistance grant from MTC, will develop an action plan to update the City’s parking regulations and align the City’s parking program with MTC’s TOC Policy. The action plan includes proposed zoning text amendments to eliminate parking minimums within one-half mile of the Vallejo Ferry Terminal and Mare Island Ferry Terminal, establish parking maximums within the same area, and allow unbundled parking and shared parking citywide.

Action Plan;
Ordinance
City of Vallejo -
Public Works
Department; City
of Vallejo -
Planning and
Development
Services
Tony Chu, ;
Hector Rojas,
Long-Range
Planning
Manager; Robert
Busick, Senior
Planner
In Progress The project was originally managed by the City's former Transportation Program Superintendent and is now
being co-led by staff from the Public Works Department
and Planning and Development Services Department. In
November 2025, the City met with MTC and AECOM to
re-initiate the project. Since that time, City staff has reviewed the administrative draft action plan and
provided comments to AECOM to support finalization of
the draft. Next steps include finalizing the draft action plan, coordinating with the City Attorney’s Office on
zoning text amendments, and bringing the action plan
and associated zoning amendments before the Planning
Commission and City Council for consideration and
adoption by June 2026.

CEQA/VMT Transportation
Impact Analysis Guidelines
This project will update the City's Transportation Impact Analysis (TIA) Guidelines to establish general procedures and requirements for preparing CEQA-compliant transportation impact studies for land use development projects in Vallejo, consistent with Senate Bill 743, which shifts the focus of transportation analysis from vehicle delay (LOS) to vehicle miles traveled (VMT).

General Plan
Amendment
City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The City contracted with Fehr & Peers to prepare updated guidelines, and the consultant submitted an
administrative draft in March 2025. City staff reviewed the draft and provided annotated comments, which were
incorporated into a second draft. However, the
consultant’s contract expired in June 2025, and
additional work is required to expand the scope and
ensure the guidelines are legally defensible, including development of substantial evidence to support vehicle
miles traveled (VMT) screening criteria for small and
local-serving retail projects. A new contract was drafted in August 2025 to expand the scope of work; the City
Attorney’s Office is currently coordinating with the
consultant’s legal counsel to finalize acceptable
indemnification language. Upon execution of the
amended contract, the consultant will complete the
expanded scope of work and finalize the guidelines
within two to three months, after which staff will work with the City Attorney’s Office to bring the guidelines before the Planning Commission and City Council for
consideration and adoption by the end of the year.

City of Vallejo 3 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Inclusionary Housing Zoning
and In-lieu Fee Feasibility Study
This project will evaluate the feasibility of adopting an inclusionary housing ordinance in Vallejo, including an analysis of in-lieu fee options. The study will assess market conditions, development economics, and policy alternatives to determine appropriate inclusionary requirements and fee structures that support affordable housing production while maintaining development viability.

Study; Zoning
Text Amendment
City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The City contracted with Economic & Planning Systems (EPS) to prepare the Inclusionary Housing and
Commercial Linkage Fee studies. EPS completed the
studies in June 2025 and presented the results at joint Planning Commission and City Council study sessions
on July 7, 2025, and November 24, 2025. The studies
concluded that the development prototypes analyzed are
not currently financially feasible, even prior to the
application of affordability requirements or additional impact fees. At the November 24, 2025 joint meeting,
the Planning Commission and City Council directed staff to proceed with drafting ordinances to establish
inclusionary housing requirements and a commercial
linkage fee. On December 22, 2025, and January 15,
2026, staff met with the City Attorney’s Office to review inclusionary housing regulations from other jurisdictions and begin developing policy options for future
consideration by the Planning Commission and City
Council. Staff is scheduling a final meeting with the City Attorney's Office to complete the draft policy options.

Commercial Linkage Fee Nexus
Study
This project will prepare a nexus study to evaluate the relationship between new commercial development and the demand for affordable housing in Vallejo. The study will analyze employment generation, wage levels, and housing needs associated with commercial projects to determine a legally defensible fee structure that supports affordable housing production.

Study; Zoning
Text Amendment
City of Vallejo -
Planning and
Development
Services
Hector Rojas,
Long-Range
Planning Manager
In Progress The City contracted with Economic & Planning Systems (EPS) to prepare the Inclusionary Housing and
Commercial Linkage Fee studies. EPS completed the
studies in June 2025 and presented the results at joint Planning Commission and City Council study sessions
on July 7, 2025, and November 24, 2025. The studies
concluded that the development prototypes analyzed are
not currently financially feasible, even prior to the
application of affordability requirements or additional impact fees. At the November 24, 2025 joint meeting,
the Planning Commission and City Council directed staff to proceed with drafting ordinances to establish
inclusionary housing requirements and a commercial
linkage fee. On December 22, 2025, and January 15,
2026, staff met with the City Attorney’s Office to review inclusionary housing regulations from other jurisdictions and begin developing policy options for future
consideration by the Planning Commission and City
Council. Staff is scheduling a final meeting with the City Attorney's Office to complete the draft policy options.

City of Vallejo 4 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Solano Bayshore Resiliency
Project
This is a multi-jurisdictional effort led by the Fairfield-Suisun Sewer District (FSSD), in partnership with Solano County and its cities, to develop a Subregional Shoreline Adaptation Plan.

The project will integrate nature-based and hybrid strategies to protect infrastructure, communities, and ecosystems from the impacts of sea level rise. Key components include a vulnerability assessment of shoreline hazards, equitable community engagement to ensure diverse input, and science- based adaptation planning that equips local governments with tools for long-term resilience and proactive climate
adaptation. Funded through the Governor’s Office of Land Use and Climate Innovation’s Regional Resilience Grant
Program, the plan will provide coordinated strategies that reduce risks to infrastructure, ecosystems, and vulnerable populations while advancing regional collaboration.

Shoreline
Adaptation Plan
Fairfield-Suisun
Sewer District;
Solano County
Meg Herston,
Director of
Environmental
Services
In Progress The project is advancing through a phased approach.

Phase 1 (Pre-Planning) focused on community outreach,
equitable engagement, and initial vulnerability
assessments. Phase 2 (2025–2026) is underway and
emphasizes data collection, hazard mapping, and
exposure analysis, while Phase 3 will focus on
development of the shoreline adaptation plan, including specific strategies and project concepts. City staff has actively participated in Technical Advisory Committee
(TAC) meetings on behalf of the City of Vallejo and
attended the Vallejo Community Working Group meeting
held at the Vallejo Public Library in November 2025. In accordance with San Francisco Bay Conservation and
Development Commission (BCDC) requirements, the
City posted a Notice of Intent to initiate the Subregional Adaptation Plan on the City’s website and promoted the
upcoming online community meeting scheduled for
January 22, 2026 through the Vallejo Weekly and the
City’s email distribution lists. Next steps include
continued participation in TAC meetings, participation in the January 2026 online community meeting, and
coordination with project partners to advance community engagement, prepare the draft Subregional Adaptation
Plan, complete environmental review, and move the plan
toward adoption.

Solano County Agricultural
Initiative
This is a two-year countywide initiative led by the Solano County Board of Supervisors and Department of Agriculture to strengthen the long-term viability of the County’s agricultural economy and protect working lands. Funded by a Sustainable Agricultural Lands Conservation (SALC) grant, the initiative will engage a coalition of strategic partners to prepare an agricultural economic development plan, assess infrastructure needs, and develop land use actions that support
conservation and city-centered growth. The effort is intended to enhance local food systems, agritourism, processing, and distribution networks while safeguarding Solano’s agricultural heritage.

Agriculture PlanSolano County -
Department of
Agriculture
Ed King,
Agricultural
Commissioner
In Progress The project team shared the draft Land Use Assessment and Action Plan with the Steering Committee in
September 2025, to solicit initial feedback on proposed strategies, including updates and potential expansion of the Agricultural Reserve Overlay (ARO), establishment
of an inter-agency planning group to coordinate housing and farmland preservation efforts, and collaboration with cities to define clear planning goals within spheres of influence. Feedback from the Steering Committee will
inform revisions to the draft and support subsequent
phases addressing agricultural viability and
infrastructure needs. City staff has actively participated in Land Use & Infrastructure Committee (LUIC) meetings
on behalf of the City of Vallejo. Next steps include
continued participation in LUIC meetings and review of
draft work products to assess potential impacts to
Vallejo. The initiative is anticipated to be completed in 2026.

City of Vallejo 5 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Solano-Napa North Bay
Passenger Rail Feasibility Study
This study is a joint effort by the Solano Transportation Authority (STA) and the Napa Valley Transportation Authority (NVTA) to evaluate the feasibility of extending passenger rail service between Solano and Napa Counties. Building on the 2024 Vallejo Passenger Rail Study, the project will assess how Napa County and the City of Napa could be served and how new north–south passenger rail services can best
integrate with potential east–west connections linking Novato, Suisun/Fairfield, Capitol Corridor, and SMART. The study includes a review of previous plans, existing conditions analysis, market demand and service planning, governance models, community benefits, and capital and operating cost estimates. Its goal is to develop service options that align with the California State Rail Plan, improve multimodal
connectivity, and support economic development in the North Bay.

Feasibility StudySolano
Transportation
Authority; Napa
Valley
Transportation
Authority
Kathrina Gregana,
Associate Planner
In Progress The project team has completed a review of prior studies and prepared an existing conditions
memorandum. A market assessment and conceptual
service plan have also been completed, including
analysis of trip flows between Napa, Vallejo/American
Canyon, and Fairfield/Suisun City. Draft service
development goals emphasize frequent service
connecting Napa–Vallejo–Suisun, with transfers to
Capitol Corridor, SMART, and the Vallejo Ferry. City
staff has actively participated in monthly check-in
meetings with project partners. Next steps include
continued participation in monthly meetings, stakeholder outreach, and review of draft work products as the
project team advances development of a conceptual
service vision.

Regional Mapping & Wayfinding
Pilot - Vallejo
This project is part of the Metropolitan Transportation Commission’s (MTC's) Regional Mapping and Wayfinding
Program, which is creating a standardized, easy-to-use transit navigation system across the Bay Area. Vallejo was selected as one of nine pilot hubs due to its role as a multimodal gateway. The pilot will test a coordinated set of new regional wayfinding signs and maps, designed to improve
accessibility, clarify connections between bus and ferry services, and enhance the rider experience. The project will also address outdated and inconsistent signage, improve ADA-accessible pathways, and coordinate with local
improvements such as the Vallejo Mobility Hub project.

Lessons learned from the pilot will inform a broader regional rollout of wayfinding standards.

Transit
Wayfinding
Metropolitan
Transportation
Commission
Gordon Hansen,
Mapping and
Wayfinding
Project Manager
In Progress A draft pilot sign placement strategy was shared for stakeholder review in August 2025, outlining proposed
locations and typologies for bus, ferry, pedestrian, and vehicular wayfinding signs. City staff participated in a March 2025 site visit to inform project recommendations and reviewed Nelson\Nygaard’s draft recommendations
with Public Works staff, providing consolidated
comments in August 2025. Stakeholders - including the
City of Vallejo, SolTrans, the Solano Transportation
Authority (STA), and the Napa Valley Transportation
Authority (NVTA) - are currently providing feedback on
design coordination, ADA accessibility, and integration with concurrent projects. Next steps include final design refinements, permitting, and fabrication in 2026, with
staff supporting pilot project implementation by Public Works as needed..

Ferry Terminal Access Plan This project, led by the Water Emergency Transportation Authority (WETA) in partnership with the City of Vallejo, will evaluate and improve multimodal access to the Vallejo Ferry Terminal and adjacent Transit Center. The plan will analyze existing walking, biking, transit, and driving conditions within a two-mile radius of the terminal, identify gaps and barriers in the first/last mile network, and propose infrastructure and programmatic improvements that enhance safety,
connectivity, and the overall passenger experience. Key components include a Level of Traffic Stress (LTS) and
walk/bike shed analysis, review of existing plans and projects, development of access improvement strategies, and robust public and stakeholder engagement. The plan will also
include cost estimates, funding strategies, and an
implementation program to prioritize both quick-build and long- term projects. Findings will support WETA, the City, and regional partners in aligning future access improvements with upcoming planning efforts, including the Downtown and
Waterfront Specific Plans and MTC’s Transit-Oriented
Communities (TOC) policy.

Transportation
Plan
Water Emergency
Transportation
Authority
Gabriel Chan,
Transportation
Planner
In Progress WETA retained Fehr & Peers to prepare the study, with work initiated in August 2025. The consultant team is
currently conducting an existing conditions analysis,
including data collection, field visits, and walk/bike shed mapping. City staff has actively participated in weekly project check-in meetings with project partners,
reviewed and provided comments on the draft existing
conditions chapter, and promoted the project website
through the Vallejo Weekly and the City’s email
distribution lists. The project website is currently
collecting community input through an interactive map
feature. Next steps include continued participation in
weekly project and stakeholder meetings, initiation of
stakeholder engagement and public outreach, and
review of draft work products as the project advances
toward preparation of a draft plan in 2026.

City of Vallejo 6 Planning Division

VALLEJO LAND USE ENTITLEMENT (VALUE) LIST
Long Range Planning Projects - January 2026
Project Description Project Types Lead Agency Agency ContactStatus Status Notes Zoning - Clean Up (Phase II) Focus on cleaning up procedures & permits (part 6) Ordinances City of Vallejo, Planning and
Development
Services
Department
Hector Rojas,
Long-Range
Planning Manager
On Hold
Sonoma Boulevard Specific Plan
Update
Specific Plan City of Vallejo,
Planning and
Development
Services
Department
Hector Rojas,
Long-Range
Planning Manager
On Hold
Bicycle and Pedestrian Master
Plan
Master Plan City of Vallejo,
Planning and
Development
Services
Department
Hector Rojas,
Long-Range
Planning Manager
On Hold
Vacation Rental Policy Ordinance City of Vallejo,
Planning and
Development
Services
Department
Hector Rojas,
Long-Range
Planning Manager
On Hold
City of Vallejo 7 Planning Division
1 2025 YEAR END SUMMARY / ACTIVITY REPORT ECONOMIC DEVELOPMENT DEPARTMENT February 2026 Prepared by: Brad Paul, Interim Economic Development Director Economic Development (ED) Department staff I. Economic Development Department Overview Despite operating at 60% staffing capacity throughout 2025, the Economic Development (ED) Department implemented a number of projects from Vallejo’s Economic Development Strategic 2 Plan (Cycle 1) and helped advance major development in the city. Some high-level accomplishments include the following. 1. Implemented Vallejo’s new $355,000 Business Revolving Loan Fund. 2. Ramped up to launch the Pop-Up Events and Shop Local programs in early 2026. 3. Completed Round 3 of the Hardening Grants for business security improvements. 4. Collaborated on environmental cleanup of the 26-acre PG&E site on southern waterfront. 5. Helped advance ongoing development projects (Blue Rock Springs, Costco, Mare Island, etc.). 6. Worked with key stakeholders on the Mare Island Project including Mare Island Company (MIC), the Department of the Navy, State Lands Commission and Lennar Mare Island on various projects including a new development agreement and Navy’s first property transfer to the city in over 10 years. 7. Managed a number of environmental assessments and the EPA grant that funded them. 8. In collaboration with Public Works, Planning and the Mare Island Historic Parks Foundation, managed the grant funded restoration work on the Mare Island Chapel and Quarter’s A (Admiral’s Mansion). 9. Advanced land disposition and acquisition projects in Vallejo and on Mare Island. 10. Conducted 25 site visits to Vallejo small businesses to provide support and resources. 11. Continued to provide staff support to a number of city Commissions and Boards. 12. Attended multiple community meetings to assist our local economic development partners. Staffing Update: Throughout 2025, three of seven authorized Economic Development staff positions remained vacant: the Director’s position, a Program Manager and a Secretary. The work was carried out by four staff: Erin Hanford, Mare Island Program Manager; Ivette Iraheta, Program Manager; Cathy Nubla, Administrative Analyst II, and Annette Taylor, Senior Community Development Analyst. During part of 2025 staff was augmented by Amalia Cunningham, a planning consultant. II. Key Vallejo Economic Indicators Population: 123,481 (census.gov ) Employment: 57,800 (bls.gov) Unemployment rate: 5.6% (bls.gov) & CA EDD) Taxable sales (2025 Q3): $385,817,097 (cdtfa.ca.gov) Median household income: $89,496 (census.gov) Median home value: $557,500 (census.gov) Retail vacancies for lease: 37.39% (Co-star) Retail vacancies for sale: 62.5% (Co-star) Office vacancies for lease: 24.35% (Co-star); Office vacancies for sale: 17.5% (Co-star) Active businesses: 7,276 (CY 2025 – HdL) Hotel occupancy: 49.8% (Visit Vallejo – calendar year) 3 Hotel average daily rate: $91.60 (Visit Vallejo – calendar year) III. Revolving Loan Fund The City Council had previously approved a contract with Solano Economic Development Corporation (EDC) to use $355,000 of Vallejo’s ARPA money to establish a new revolving loan fund for local businesses that would operate from 12/31/24 through 12/31/26, the deadline for expending the ARPA funds. The Solano EDC promoted the program at a variety of outreach events, submitted referrals to Solano/Napa Small Business Development Center (SBDC) and worked with Travis Credit Union to process applications.

During 2025, two (2) loans were approved for a total of $100,000. Another loan was approved in February 2026 for $125,000 bringing the total funds expended to date to $225,000. Solano EDC currently has four applications pending and is confident it will be able to spend down the remaining ARPA funds by the 12/31/26 deadline. IV. Pop-Up Events The RFP for this program ($34,000 in the first year) was drafted in 2025 and released on 1/7/26. Staff received 10 proposals, will be interviewing the finalists in March and requesting some additional funds in the midyear budget. V. Shop Local Campaign Staff drafted a $28,000 Shop Local Campaign RFP in late 2025 and the Economic Development Commission (EDC) provided input on the scope of work at its 1/14/26 meeting. Staff has incorporated that feedback and will be posting it in late February or early March. A strong response is expected given staff outreach and what was just experienced with the Pop-Up Events RFP. Program implementation is set for Q2 of 2026. VI. Hardening Grants Program The City Council allocated $125,000 for Round 3 of the Hardening Grants program in mid-year 2025. These funds were meant to reimburse small businesses that suffered negative impacts and submitted receipts for security improvements. Grants were awarded to 17 Vallejo small businesses in amounts up to $3,000. VII. Development Projects – Southern Waterfront (PG&E site) In 2025, PG&E substantially completed the environmental clean-up of its 26-acre site (former Manufactured Gas Plant) on the city’s Southern Waterfront. The soil remediation work is done and the Boat Launch Parking Lot (including new asphalt, lighting, public rest rooms) was 90% complete at the end of the year. Remaining items include handrails along the access walkways, electrical and EV charging infrastructure, removal of equipment and a general clean-up of the area. 4 To allow the restoration work to occur safely, the site was closed to the public during the clean-up and under surveillance until construction is completed – targeted for 3/2026. PG&E will be responsible for environmental monitoring for two years after the property is conveyed to the city once the project is completed. City staff and City Council members participated in PG&E led site tours in February. VIII. Development Projects – Blue Rock Springs/Golf Course During the past year, the Lewis Group held multiple public outreach meetings (1/15/25, 6/4/25, 6/18/25 and 10/15/25) with a collaboration team including representatives from the golfing community, GVRD, the City of Vallejo and two members at large. On 8/26/25, the Lewis Group held an outreach meeting to provide the community with an opportunity to learn more about its revised, updated project concepts, ask questions and provide comments. Three concepts were presented to the City Council on 9/9/25 and the one selected included a new clubhouse/event center with a 350 person capacity, the ability to increase that capacity to 500, golf course restoration and driving range modifications on the East Course, golf programming on the West Course, and the construction of 600 homes. IX. Development Projects – Costco/Fairview at Northgate Major components included: Ø Costco store with tire center, gasoline sales, and 774 parking spaces: Ø A commercial center with four buildings totaling 27,500 sq. ft. including a drive-through restaurant and 188 surface parking spaces. Ø Initial proposal included 178 two-story single-family dwellings. Developer hasasked to increase residential component. X. Development Projects – Mare Island The Economic Development (ED) Department continued working with Mare Island Company (MIC), the Department of the Navy, the State Lands Commission, Lennar Mare Island and other key stakeholders on a variety of development agreements, land transfers and clean-up efforts including: • Mare Island Development Agreement (DA). Facility Agreement and Master Sublease Agreement. In 2005, staff commenced negotiations with Mare Island Company (MIC) on a new Mare Island DA to cover both the South and North Island and a master sublease for approximately 131 acres of public trust parcels that are part of MIC’s current DA. • MIC Reimbursement Agreement. To alleviate city costs on the above projects, staff commenced negotiations with MIC on a new reimbursement agreement to cover the above agreements (DA, Facility Agreement and Master Sublease) as they were not included in the 2022 North Mare Island Disposition and Development Agreement (DDA). 5 • State Lands Public Trust Termination Agreement. ED staff successfully negotiated the release of State public trust land claims with State Lands Commission via a draft patent for over 300 acres of land on Mare Island, thereby removing a cloud on the title. This agreement is under final review with State Lands and is anticipated to be signed and recorded by the State in mid-2026. • Island Energy Gas and Electric Operations Agreement In March 2025, the City of Vallejo and City of Pittsburgh (Island Energy) executed the first amendments to the agreements for the operation of gas and electricity to Mare Island that were to expire March 1. 2025. The amendments extended the terms one-year and included a 6-month extension option that was exercised in early 2026, extending the expiration date to 8/31/26. • Environmental Cleanup. Staff continues to oversee Lennar Mare Island (LMI) and Navy environmental cleanup projects focusing on the properties to be conveyed or leased to the City. o The Navy has 17 remaining cleanup sites in various stages of cleanup covering approximately 800 acres on Mare Island plus 400 acres of submerged lands. Anticipated completion is 2030. o LMI recently completed the environmental cleanup of the Eastern Early Transfer Parcel (EETP), a project started in 2001 consisting of 14 Investigation Areas (IA), 854 cleanup sites and 650 acres of residential and commercial/industrial lands. ED staff oversees this project and has coordinated the approval of over $100M in disbursements of Navy grant funds to pay for this remediation work (using Navy funds). Staff continues to handle the disbursements and is preparing for a Navy audit of this grant anticipated for some time in 2026. • U.S. Economic Development Administration Mare Island Infrastructure Assessment (MIIA) project. The MIIA report was completed on 10/20/25 and presented to City Council during its 11/4/25 meeting (it’s live on City’s website). City Council recommendations were incorporated as feasible within consultant’s contracted budget and the remaining requests for providing cost estimates will be produced through future report updates, which include additional sewer and sea level rise assessment. Total project cost: $2,082,292 – EDA portion ($1,515,927), Mare Island Co. ($326,365), City/VFWD in-kind staff time ($240,000). Expended all funds within grant timelines (4 years) and now working on grant close out. • U.S. Environmental Protection Agency $600,000 Brownfield Cleanup Grant (2021). Completed 24 environmental assessments on Mare Island and other downtown sites. Expended all grant funds within grant timelines ($600,000 over 4 years) and finalized grant close out by year end. • U.S. Environmental Protection Agency $500,000 Brownfields Assessment Grant (2025). City secured a second EPA Brownfields Assessment Grant in the amount of $500,000 during Fall 2025. Grant has 4-year implementation period. City is targeting environmental assessment of at least 10 sites on Mare Island, Southern Waterfront and other areas. This grant includes a more robust community engagement component than 2021 grant. 6 • Rehabilitation of Quarter’s A Mansion and Chapel on Mare Island. Staff worked with Public Works Department CIP team on management of two separate grants for facility improvement to Quarter’s A and the Mare Island Chapel. • o U.S. National Park Service (NPS): Quarter’s A Rehabilitation ($1.5M/City 50% local match) § Project focused on an earthquake retrofit and ADA upgrades to the building. § Architecture firm selected for design work. § Plan/Building/Environmental review underway. § Expect to go out to bid for construction in late Spring 2026. o U.S. Dept of Housing & Urban Development (HUD): Quarter’s A and Chapel Rehabilitation ($1.2M/No local match) § Staff working in collaboration with Mare Island Historic Park Foundation, the City’s tenant of these two buildings, who was awarded this grant. § Plan/Building/Environmental review underway; design development at 60% § Expect to go out to bid for construction in late Spring 2026, combining NPS and HUD grants into a single bid to achieve cost savings. § Collaborating with Mare Island Historic Park Foundation: they were awarded the HUD grant in 2022. XI. Land Disposition and Acquisition – Mare Island Navy Land Transfers. To ensure the City understands the costs and benefits associated with Navy land transfers staff is managing a due diligence review of the first property proposed for transfer from the Navy in over ten (10) years, the PMA Housing Area. Consultant agreements for the environmental and financial analysis assessment have been executed, and those assessments are under way. Staff is facilitating the transfer of a number of sites on Mare Island including the PMA Housing Area Navy Transfer Request. § The Navy has requested transfer of this approximately 14-acre site located across from the Mare Island Cemetery. The site, which includes 6 officer’s homes built from 1860 to1911 is subject to Public Trust. § The Navy submitted draft deed to City and the City is performing our due diligence including an environmental, feasibility and condition assessment of the facilities. XII. Commissions and Boards Staff provides ongoing support to a number of city commissions and boards including the: Economic Development Commission (EDC) Ø New work plan approved by City Council during its 7/22/25 meeting. Ø 2025 EDC work plan focuses on 5 key strategies. Ø 2025 EDC work plan has $27,967 budget for FY 2025-26. Ø EDC is forming Ad Hoc Subcommittees to implement work plan strategies. Ø 2025 work plan implementation target is for two years or longer. 7 Commission on Culture and the Arts Ø Held goals and work plan meeting 4/24/25. Ø Continued to work on their 7/2023 City Council approved work plan. Ø Reviewed and edited draft Loan Policy and Gift Policy. Ø Continued to work on draft Long-Term Citywide Arts and Culture Strategy. Ø Present draft work plan with budget to City Council 3/2026. McCune Collection Commission Ø Oversee care of the McCune Collection. Ø Open McCune Room on first and third Tuesdays; 2nd Friday art walk for public access. Ø Hosted Holiday Cheer Open House with demonstrations of Albion Press on 12/28/25. Ø Revised goals/work plan established October 2024 to present to City Council on 3/2026. Remediation Advisory Board (RAB) Ø City representative at quarterly meetings. Mare Island Historic Park Foundation (MIHPF) Ø City representative at bimonthly meetings XIII. Economic Development Partners Attended multiple meetings throughout the year to collaborate with and assist local economic development partners as they sought to retain, grow and attract businesses to Vallejo. These groups included, among others: Solano County Economic Development Corporation (EDC) Ø Two-year contract for Revolving Loan Fund for Vallejo small businesses. Ø Attend monthly meetings and participate in various EDC events. Solano/Napa Small Business Development Center (SBDC) Ø Partner with SBDC through an agreement to assist Vallejo small businesses. Ø Provided one-on-one advise to 164 clients, held 94 webinars in 2025. Vallejo Chamber of Commerce Ø Attend monthly Gov’t Affairs and Economic Development Committee meetings. Ø Attend monthly networking events, provided assistance/support as needed. Vallejo Convention & Visitors’ Bureau (Visit Vallejo) Ø Partner with Visit Vallejo to promote tourism. Ø Increase VTBID amount for FY 2026 and FY2027. Regional Chambers of Commerce Ø Collaborate with and update on ED activities. XIV. Conclusion 8 To carry out our 2026 Work Plan, the city will need to fill the department’s three vacant positions including a new permanent Director, a Program Manager and a Secretary. This will allow staff to fully implement our Economic Development Strategic Plan, help existing businesses survive and grow, and attract new businesses that generate tax revenue, hire residents and bring in new workers that spend money in Vallejo. Given Vallejo’s unique assets, its central location; easy water, rail and highway access; an historic working waterfront and shipyard, reliable energy at reasonable prices, and some of the most affordable residential, commercial and industrial property in the Bay Area, with the right leadership and vision Vallejo can work closely with SF, Silicon Valley and Fremont to be the first place those cities think of when one of their major employers expresses the need to expand production in a less expensive area. It’s clearly in their best interest to work with us to keep new production capacity in the Bay Area. Why? They know once a major employer moves its production to Texas, Mississippi or Florida, its headquarters, jobs and taxes often follow. By developing relationships with economic development directors in those successful cities, and the state officials that are now pitching Benecia, Mare Island and Cal-Poly Maritime (along with new state tax subsidies for shipbuilding) to major shipbuilders from Europe, Japan and South Korea, Vallejo can provide a solution to the Bay Area’s need for lower cost locations where the region can develop the next generation of jobs in shipbuilding/ship repair, new drone and electric battery manufacturing; health care; and the aerospace and defense thanks to our proximity to Travis AFB, NASA Ames Research Center, etc. But to fully take advantage of these growing openings and address some our remaining challenges we will need a fully functioning and successful Economic Development Department to compete at the regional level, leverage the assets we have and use enlightened self-interest to convince our colleagues in Fremont, SF, Silicon Valley and Sacramento that we are the partners they’ve been looking for to protect their own jobs and revenue from leaving the Bay Area and California. I look forward to meeting with you in April to go over these ideas in more detail and some additions we can make to the city’s Economic Development Strategic Plan to transform Vallejo from the proverbial city on the verge of success to a place that is successful and has more and more people coming here to work, live, plan and create.

Brad Paul, Interim Economic Development Director [email protected] 9

← All documents from this meeting