Cities Index.
Agenda packet

Vernon City Council
October 18, 2022

Document
Agenda packet
Meeting
October 18, 2022
Body
Vernon City Council
Pages
133
Original file
23.8 MB
Text extracted from the city's file for reading and search. Open the original on cityofvernon.primegov.com. That file is the official record.

Services Agreement with Ocean Blue Environmental Services, Inc.

EXHIBIT B

SCHEDULE

CITY OF VERNON RATES
EFFECTIVE AUGUST 1, 2022

DEFINITIONS
Straight Time: Monday through Friday, from 7:00 AM to 4:00 PM Overtime: Monday through Friday, before 7:00 AM and after 4:00 PM, and all day on Saturdays
Premium Time: Sundays, Following Holidays

HOLIDAYS OBSERVED
New Year's Day Labor Day
Martin Luther King, Jr.'s Birthday Presidents Day
Veterans Day Memorial Day
Fourth of July Thanksgiving Day
Day after Thanksgiving Columbus Day
Christmas Day

MINIMUM CHARGES
Four (4) hour minimum charges will apply to all call outs. Portal to Portal rates apply.

Time charges include personnel, equipment and materials for preparation, mobilization, travel to and from site, demobilization, decontamination, transportation and unloading.

DISPOSAL AND OUTSIDE COSTS
All disposal, services, non-heavy equipment rentals, and materials not on the rate sheet will be billed at cost plus a twenty percent (20%) handling charge. Heavy equipment rental will be billed at cost plus twenty five percent handling charge due to high liability cost.

PREVAILING WAGE
An additional $40 per hour will be added to personnel and equipment with operator rate.

PAYMENT TERMS
All terms are net-thirty (30) days upon receipt of invoice, unless previous arrangements have been made. All emergency response work for non-established customers is C.O.D.

AUGUST 1, 2022 CITY OF VERNON RATES

1. HAZARDOUS WASTE-TRAINED PERSONNEL HOURLY RATE

STRAIGHT OVER- PREMIUM

CLASSIFICATION TIME TIME TIME
PROJECT MANAGER 118.00 154.70 154.70
SUPERVISOR 90.90 108.40 124.10
CHEMIST / INDUSTRIAL HYGIENIST 181.00 207.10 207.10
LEAD TECHNICIAN 63.00 91.80 119.80
EQUIPMENT OPERATOR 60.30 90.90 116.20
TECHNICIAN 56.90 80.40 104.90
ILWU (INT. LONGSHORE & WHSE UNION) TECH 79.50 118.90 159.90 ALL PERSONNEL HAVE AT A MINIMUM, 40-HR HAZ-WOPER TRAINING AS SPECIFIED BY 29 CFR 1910.120

2. CERTIFIED HAZARDOUS WASTE TRANSPORTATION VEHICLES HOURLY RATE UTILITY TRUCK 4X4 W/TRAFFIC CONTROL LIGHTS & LIFTGATE 49.80 GEAR TRUCK W/ LIFTGATE 49.80
EMERGENCY RESPONSE UNIT - LARGE 231.60
EMERGENCY RESPONSE UNIT - SMALL 160.90
CREW VAN 43.70
BOB CAT W/SOLID TIRES 54.20
VACUUM TRAILER - 20 BBL 54.20
VACUUM TRUCK - 70 BBL W/ ROPER PUMP* 132.90
VACUUM TRUCK - 120 BBL* 152.10
VACUUM TRUCK - 120 BBL STAINLESS STEEL* 172.20
AIR EXCAVATOR* 132.90
HYDRO EXCAVATOR* 246.60
OMNI VAC - 85 BBL* 246.60
JETTER / VACTOR COMBO UNIT* 246.60
ROLL-OFF TRUCK* 132.90
ROLL-OFF TRUCK AND TRAILER* 152.10
DUMP TRUCK - 10 WHEEL* 93.50
TRASH COMPACTOR* 185.30
25' BOX VAN* 93.50
45' BOX VAN* 132.90
45' FLAT BED* 132.90
25' EQUIPMENT TRAILER 35.00
STREET SWEEPER 87.40

3. RESPIRATORY / CONFINED SPACE ENTRY EQUIPMENT
SELF-CONTAINED BREATHING APPARATUS (30 MIN.) 135.40 DAILY 6-PACK BREATHING AIR BOTTLES 271.80 DAILY
5-MINUTE EGRESS AIR BOTTLE 38.50 DAILY
TRIPOD W/DOUBLE WINCHES 243.00 DAILY
FULL BODY HARNESS W/ SHOCK ABSORBER 35.00 DAILY
"*" DENOTES EQUIPMENT INCLUDING OPERATOR. THESE WILL BE CHARGED AN ADDITIONAL $29.00 PER HOUR FOR OVERTIME AND $39.00 PER HOUR FOR PREMIUM TIME.

PAGE 2 OF 6
AUGUST 1, 2022 CITY OF VERNON RATES
COPPUS BLOWER 196.70 DAILY
4-GAS AIR MONITOR 298.20 DAILY
PID METER 412.60 DAILY
MERCURY VAPOR ANALYZER 516.60 DAILY
OVA MONITOR 361.00 DAILY
PERSONAL 4 GAS METER 246.60 DAILY
ELECTRIC BLOWER 79.50 DAILY

4. TRAFFIC CONTROL
ARROW BOARD 221.20 DAILY
PORTABLE DECON STATION W/ARROWBOARD 295.50 DAILY
BARRICADES W/ REFLECTORS, EACH 32.40 DAILY
DELINEATOR/REFLECTIVE, EACH 1.80 DAILY
NO TURN RIGHT OR LEFT SIGNS, EACH 15.80 DAILY
TRAFFIC CONE/REFLECTIVE, EACH 2.60 DAILY
TRAFFIC CONTROL SIGNS 48"X48"/REFLECTIVE 36.70 DAILY

5. CLEANING EQUIPMENT
AIR COMPRESSOR 41.90 HOURLY
CHEMICAL DIAPHRAGM PUMP 310.30 DAILY
DECONTAMINATION STATION 211.50 DAILY
DIAPHRAGM PUMP 222.10 DAILY
SUCTION/DISCHARGE HOSE (PER FOOT) 0.90 DAILY
LAYFLAT HOSE (PER FOOT) 0.90 DAILY
HYDROBLASTER 77.80 HOURLY
INTRISICALLY SAFE PUMP FOR FUEL TANKS 108.40 DAILY
PRESSURE WASHER - 1,000 PSI 22 GPM 69.90 HOURLY
PRESSURE WASHER - 3,500 PSI 6 GPM 60.30 HOURLY
ENGINE DRIVEN PUMPS 509.20 DAILY
PORTABLE TRASH PUMP 207.10 DAILY
SUBMERSIBLE PUMP 183.60 DAILY
AIR SCRUBERS PORTABLE 172.20 DAILY
HEPA FILTERS FOR SCRUBBERS 128.60 EACH
55 GALLON CARBON SCRUBBER FOR VAC TRUCKS 196.70 DAILY
3 STALL DECONTAMINATION SHOWER 295.50 DAILY

6. PORTABLE STORAGE UNITS
20-YARD BIN, OPEN TOP 25.40 DAILY
20-YARD BIN, CLOSED TOP 30.60 DAILY
40-YARD BIN, OPEN TOP 25.40 DAILY
40-YARD BIN, CLOSED TOP 32.40 DAILY
4" TANK MANIFOLD 19.20 DAILY
BIN LINERS 52.50 EACH

7. OIL SPILL EQUIPMENT
20' DRUM & SUPPLY TRAILER W/ 4' SIDES & 12,000 GVW 207.10 DAILY BOOM TRAILER (STANDBY) W/ 1500' OF 8"x12" BOOM 154.70 DAILY PAGE 3 OF 6
AUGUST 1, 2022 CITY OF VERNON RATES
BOOM 8"x12" (DEPLOYED) 1.80 PER FT/DAY
BOOM 4"x12" (DEPLOYED) 0.90 PER FT/DAY
22' TOW/SPILL CONTROL BOAT W/ 200 HP MOTOR 132.90 HOURLY 22' x 8' SELF POWERED BARGE 89.10 HOURLY
19' TOOL SPILL BOAT W/90HP 89.10 HOURLY
17' TOW/SPILL CONTROL BOAT W/ 40 HP MOTOR 74.30 HOURLY
14' TOW/SPILL CONTROL BOAT W/ 25 HP MOTOR 58.60 HOURLY
12' PUNTS 35.00 HOURLY
12' PUNTS W/ 5HP MOTOR 43.70 HOURLY
SPLASH ZONE 2-PART SEALER 162.60 PER GALLON
25 LBS ANCHORS W/ 15' CHAIN 14.80 DAILY
15 LBS ANCHORS W/ 10' CHAIN 10.50 DAILY
24" BOEYS 14.80 DAILY
EMERGENCY RESPONSE TRAILER 465.00 DAILY
ROPE MOP SKIMMER 154.70 HOURLY
DRUM SKIMMER TDS-136 W/ POWER PACK 207.10 HOURLY
SKIM-PAK SERIES 4000 W/ CONTROL SYSTEM 63.00 HOURLY
SKIMMER TRAILER 207.10 DAILY
ABSORBENT BOOM TRAILER 154.70 DAILY
ATV (ALL TERRAIN VEHICLE) W/TRAILER 270.10 DAILY
FORKLIFT TRAILER 97.90 DAILY

8. MATERIALS
10 GALLON DOT DRUM, STEEL 49.80 EACH
15 GALLON DOT DRUM, POLY 49.80 EACH
16 GALLON DOT DRUM, STEEL 49.80 EACH
20 GALLON DOT DRUM, STEEL 52.50 EACH
30 GALLON DOT DRUM, POLY 52.50 EACH
30 GALLON DOT DRUM, STEEL 52.50 EACH
5 GALLON DOT DRUM 18.40 EACH
55 GALLON DOT DRUM, POLY 61.20 EACH
55 GALLON DOT DRUM, STEEL 60.30 EACH
55 GALLON DOT DRUM, BIO 39.30 EACH
85 GALLON DRUM, OVERPAK, STEEL 221.20 EACH
95 GALLON DRUM, OVERPAK, POLY 221.20 EACH
ACID SPILFYTER NEUTRALIZER PER GALLON 77.00 EACH
BASE SPILFYTER NEUTRALIZER PER GALLON 77.00 EACH
BIO-SOLVE (HYDROCARBON ENCAPSULANT) 36.70 PER GALLON
BLEACH 4.40 PER GALLON
CHEMICAL POLY TOTES 319.00 EACH
CHLOR-D-TECT Q4000 18.40 EACH
CITRI-CLEAN, 55 GALLON 826.20 PER DRUM
DIESEL FUEL (EQUIPMENT) 5.30 PER GALLON
DRUM LINER 2.60 EACH
DUCT TAPE 6.10 PER ROLL
FACE SHIELD 13.10 EACH
HAND AUGER 86.60 DAILY
HEPA VACUUM FILTER PROTECTORS 20.10 EACH
PAGE 4 OF 6
AUGUST 1, 2022 CITY OF VERNON RATES
HEPA VACUUM REPLACEMENT BAGS 20.10 EACH
OIL SORBENT POM POMS 56.90 PER BALE
PLASTIC BAGS 74.30 PER BOX
PLASTIC SHEETING 74.30 PER ROLL
RAGS, 50 LB BOX 67.40 PER BOX
ROPE 1/2 POLY, 100' ROLL 32.40 PER ROLL
ROPE 5/8 POLY, 100' SPOOL 36.70 PER ROLL
SAMPLE JARS - 1QT 13.10 EACH
SAND BAGS 3.40 EACH
SHRINK WRAP 30.60 ROLL
SIMPLE GREEN 13.10 PER GALLON
SODA ASH 6.10 PER GALLON
SORBENT BOOM W/ JELLING MATERIAL 412.60 PER BALE
SORBENT BOOM, 8"x10" 54.20 EACH
SORBENT PADS 18"x18"x1/4" (200/BALE) 89.10 PER BALE
SUPERFINE, 25 LB BAG 18.40 PER BAG
TRIWALL BOXES 154.70 EACH
VACTOR FLEX HOSE 4" 1.80 PER FOOT
VACTOR FLEX HOSE 6" 2.60 PER FOOT

9. TOOLS AND OTHER EQUIPMENT
BIO-HAZARD "BLOOD" SPILL KIT 103.20 EACH
BOAT HOOKS 3'-9' TELESCOPING 7.00 DAILY
BOBCAT SWEEPER ATTACHMENT 218.60 DAILY
CHEST WADERS 61.20 DAILY
14 PORTABLE GAS POWERED ABRASIVE SAW 147.80 DAILY
COM-A-LONG - 4000 LBS 6.10 DAILY
CUTTING TORCH 149.40 DAILY
DRUM SAMPLING ROD (GLASS) 7.00 EACH
DRUM VACUUM - 55 GALLON 118.90 DAILY
EXTENSION LADDER 13.10 DAILY
EYEWASH STATION 32.40 DAILY
FIRE PROTECTION SUIT (1500 DEGREE PROTECTION FACTOR) 221.20 DAILY FORK LIFT 218.60 DAILY
GENERATOR, 10KV TRAILER MOUNTED 35.00 HOURLY
GENERATOR, 5500 WATTS 123.30 DAILY
HAND TOOLS 52.50 DAILY
HAND WASHING STATION 49.80 DAILY
HAZ-CAT KIT 20.10 PER TEST
HEAVY DUTY JETTER NOZZLES 234.20 DAILY
HEPA VACUUM (DRY) 154.70 DAILY
HIP WADERS 52.50 DAILY
HUDSON SPRAYER 20.10 DAILY
JACK HAMMER 90 LBS 123.30 DAILY
LIFE JACKETS 15.80 DAILY
LIGHT STAND (2 BULBS) 36.70 DAILY
LIGHT TOWER (4 BULBS) 295.50 DAILY
PAGE 5 OF 6
AUGUST 1, 2022 CITY OF VERNON RATES
MEALS ON SPILLS 7.00 EACH
MERCURY VACUUM 516.60 DAILY
NON-SPARKING COLD CUTTER / RIVET BUSTER 97.90 DAILY
NON-SPARKING COLD CUTTER TIPS 30.60 EACH
PER DIEM ALLOWANCE ON TRAVEL 162.60 DAILY
PICKS "MINERS" 2.60 DAILY
PLUG & DIKE, 1 LB CAN 25.40 EACH
POLY SIPHON (POGO) PUMP 19.20 EACH
PORTABLE RESTROOM W/SINK 154.70 DAILY
PROFILING FEE (PER WASTE STREAM) 77.80 EACH
RADIO 2-WAY, INTRINSICALLY SAFE 41.10 DAILY
SAWZALL 82.20 DAILY
SKIL SAW 36.70 DAILY
STEEL SPIKES, 36" 5.30 DAILY
TRANSFER HOSES, 1 - 4" 43.70 DAILY
TRUCK RAMPS (30,000 LBS) 295.50 DAILY
VAPOR TIGHT DROP LIGHTS 154.70 DAILY
VENTILATION FAN 118.90 DAILY
WATER METER 258.70 DAILY
WATER TANK TRAILER W/ PUMP 349.70 DAILY
DRUM DOLLY 24.50 DAILY

10. PERSONAL PROTECTIVE EQUIPMENT (PPE)
LEVEL "A" - FULLY ENCAPSULATED GAS-TIGHT SUIT
WITH SCBA 491.30 PER SET
LEVEL "B" - POLY-TYVEK THROUGH FULLY ENCAPSU-
LATED SUIT, BUT NOT GAS TIGHT W/SCBA 154.70 PER SET
LEVEL "C" - TYVEK THROUGH SARANEX SUIT W/ AIR
PURIFYING RESPIRATOR 67.40 PER SET
LEVEL "D" - TYVEK, POLY-TYVEK, COVERALL OR

RAINGEAR SUIT WITH GLOVES, BOOTS,
HARDHAT AND SAFETY GLASSES 32.40 PER SET
PAGE 6 OF 6
Services Agreement with Ocean Blue Environmental Services, Inc.

EXHIBIT C

EQUAL EMPLOYMENT OPPORTUNITY

PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees are treated equally and are not discriminated against because of their race, religious creed, color, national origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated facilities.

B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will receive consideration for employment without regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age.

C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this Agreement, discriminated against applicants or employees because of their membership in a protected class.

D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding authority, provide copies of all of its records pertaining or relating to its employment practices, except to the extent such records or portions of such records are confidential or privileged under state or federal law.

E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is prohibited by law.

City Council Agenda Item Report
Submitted by: Andrew Eguia
Submitting Department: Public Works
Meeting Date: October 18, 2022

SUBJECT
Award of City Contract No. CS-1456 Citywide Tree Wells
Recommendation:

A. Find that the proposed action is categorically exempt under the California Environmental Quality Act (CEQA) in accordance with CEQA Guidelines Section 15301, because the project consists of the maintenance, repair or minor alteration of an existing facility and involves negligible or no expansion of an existing use; B. Accept the bid proposal from FS Contractors, Inc. as the lowest responsive and responsible bidder for the Citywide Tree Wells project and reject all other bids; C. Approve and authorize the City Administrator to execute Contract No. CS-1456 in the amount of $702,690 for the construction and installation of Citywide Street Tree Wells, for a period not to exceed 60 calendar days; and
D. Authorize a contingency of $8,040 in the event of an unexpected changed condition in the project and grant authority to the City Administrator to issue change orders for an amount up to the contingency amount, if necessary.

Background:

The Citywide Tree Wells project consists of planting trees and treating stormwater by constructing 115 new street tree wells, per the City of Vernon Tree Planting Standard Plan MV 1891. The City's tree well design collects runoff from the gutter and brings it into the tree well where the runoff is treated through a combination of biofiltration, evapotranspiration, and infiltration while at the same time supplementing the irrigation requirements of the tree. This tree well standard was designed in-house by Vernon’s Public Works Engineering team.

On August 25, 2022, the Public Works Department advertised the Notice Inviting Bids (NIB) for CS-1456 Citywide Tree Wells (Project) for the construction and installation of street tree wells along Soto Street and Fruitland Avenue. The NIB was posted on the City’s PlanetBids website and published in the local newspaper. The bids for the Project were received, and opened on September 13, 2022. The calculated results were as follows:

1. FS Contractors, Inc. $702,690

2. CT&T Concrete Paving, Inc. $3,341,100
Public Works staff reviewed the bids and deemed that the bid received by FS Contractors, Inc. is the lowest responsive and responsible bid. Based on a thorough bid evaluation, staff recommends award of the proposed Construction Contract to FS Contractors, Inc.

The proposed contract has been reviewed and approved as to form by the City Attorney’s Office.

Fiscal Impact:

Funds for the construction of 115 new tree wells were included in the FY 2022-23 General Fund, Public Works, Street Operations Division Account No. 011.1043.900000 in the budget amount of $474,000. Approval of this action would require an additional appropriation of $236,730 for a contract total of $702,690 and contingency amount of $8,040. However, the Project is fully funded by the Los Angeles County’s Safe Clean Water Program (SCWP).

Attachments:

1. Contract Agreement No. CS-1456 Citywide Tree Wells

Page 1 of 117 ends

STANDARD FORM OF

CONSTRUCTION CONTRACT BETWEEN

CITY AND CONTRACTOR
This Agreement is made and entered into at Vernon, California this 18th day of October, 2022, by and between the CITY OF VERNON, a chartered municipal corporation (hereinafter "City") and FS Contractors, Inc., a California corporation (hereinafter "Contractor"), for construction of Citywide Street Tree Wells Contract CS-1456.

THE PARTIES HERETO AGREE AS FOLLOWS:

1. CONTRACT DOCUMENTS
The “Contract Documents” except for modifications issued after execution of this Agreement, shall consist of the following documents which are either attached hereto as exhibits or are incorporated into this Agreement by this reference, with the same force and effect as if set forth at length herein:

A. Governmental Approvals including, but not limited to, permits required for the Work B. This Agreement
C. Exhibit A – General Conditions
D. Exhibit 1 – Performance Bond
E. Exhibit B – Special Provisions Specific for this Project F. Exhibit C – Equal Employment Opportunity Practices Provisions G. Exhibit D – City Standard Plans
H. Notice Inviting Bids
I. Instructions to Bidders
J. Bid Forms
K. Designation of Subcontractors

2. SCOPE OF WORK
Within the Contract Time and for the stated Contract Sum, subject to adjustments thereto, and pursuant to the Contract Documents, the Contractor shall perform and provide all necessary: labor; services; supervision; materials; tools; equipment; apparatus; facilities; supplies; tools; permits, inspections, plan checks, and similar Governmental Approvals; temporary utilities; utility connections; and transportation necessary to complete the Work in strict conformity

Page 2 of 133 ends

with the Contract Documents for:

Citywide Street Tree Wells
Contract CS-1456

3. TIME FOR PERFORMANCE
Contract Time. Contractor shall achieve Substantial Completion of the Work within 60 calendar days from the Date of Commencement established in City’s written Notice to Proceed (“Contract Time”), subject to adjustment in accordance with the Contract Documents. Contractor shall achieve Final Completion of the Work, within the time established by the Certificate of Substantial Completion issued by the City. The Contract Time may only be adjusted as permitted by this Construction Contract and the General Conditions.

Time is of the essence of this Agreement. Except when the Contract Documents state otherwise, time is of the essence in the performance of the Work. Contractor acknowledges that the time limits and deadlines set forth in the Contract Documents are reasonable for Contractor to perform and complete the Work.

Liquidated Damages. If Contractor fails to achieve Substantial Completion of the entire Work within the Contract Time for Substantial Completion, Contractor shall pay City as liquidated damages the amount of two hundred and fifty dollars ($250) per day for each calendar day occurring after the expiration of the Contract Time for Substantial Completion until Contractor achieves Substantial Completion of the entire Work, as required by Article 3 of the General Conditions of Contract.

Contractor Initial here: _________.

Page 3 of 133 ends

4. CONTRACT SUM
In consideration of the Contractor’s full, complete, timely, and faithful performance of the Work required by the Contract Documents, City shall pay Contractor the sum of seven hundred two thousand, six hundred and ninety dollars/no cents ($702,690.00), payable as set forth in the General Conditions (“Contract Sum”).

IN WITNESS WHEREOF, the parties have caused this Contract to be executed the date and year first above written.

Executed at ___________________, California.

FS Contractors, Inc.:

By: _______________________________________
An Authorized Signatory
Printed Name: ______________________________
Title: ______________________________________
Date: ______________________________________
CITY OF VERNON: APPROVED AS TO FORM:

By: By:

Name: Carlos Fandino Name: Zaynah N. Moussa
Title: City Administrator Title: City Attorney
Date:

ATTEST:

By:

Name: Lisa Pope
Title: City Clerk

CONTRACTOR’S SIGNATURE MUST BE NOTARIZED
Contractor’s Corporate Seal

Page 4 of 133 ends

EXHIBIT A

GENERAL CONDITIONS
ARTICLE 1 - PRELIMINARY PROVISIONS

1.01 DEFINITIONS
The following words shall have the following meanings:

A. Allowance. A line item cost estimate established by the City to be carried in the Base Bid sum, Contract Sum, and Schedule of Values for Payment for a particular item of Work, which cannot be sufficiently defined so as to allow the Contractor to adequately determine fair value before the Bid Deadline.

Allowances include estimated amounts established by the City for certain construction elements that have not yet been fully designed or authorized for inclusion in the Work or to permit deferred approval or selection of actual materials and equipment to a later date when additional information is available for evaluation.

B. As-Builts. The documents prepared by Contractor showing the condition of the Work as actually built, including, without limitation, all changes and the exact locations of all mechanical, electrical, plumbing, HVAC or other portions of the Work that are shown diagrammatically in the Contract Documents.

C. Base Bid. The total sum stated in the Bid Form for which the Bidder offers to perform Work described in the Contract Documents as the base Contract Work (e.g. not designated as part of a Bid Alternate).

D. Bid. A complete and properly executed offer by the Bidder on City-prescribed forms to perform the Work for the prices stated in response to the Notice Inviting Bids.

E. Bid Alternate. An item of Work described in the Contract Documents as an Alternate Bid that will be added to or deducted from the Base Bid and the Contractor’s responsibility only if the City accepts the Bid Alternate.

F. Bid Forms: The City-prescribed forms which the Bidder shall complete and use to submit a Bid. The Bid Forms include: (1) Bidder’s Proposal; (2) Schedule of Bid Prices; (3) Incumbency Certificate; (4) Bid Bond; (5) Bidder’s Statement of Qualifications; (6) Experience Form; (7) Trades Experience Form; (8) Contractor Safety Questionnaire; (9) Designation of Subcontractors; (10) Affidavit of NonCollusion; (11) Insurance Requirements Affidavit; and (12) forms included in the Specification required by the type of project funding (e.g. federal, ARRA, HUD, etc.).

G. Bidder. The individual, partnership, firm, corporation, joint venture or other legal entity submitting a bid on these Contract Documents or any part thereof.

H. Bidding Documents. Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding Requirements consist of: (1) Notice Inviting Bids; (2) Instructions to Bidders; and (3) Bid Forms. The proposed Contract Documents consist of: (1) the Bidding Requirements; (2) the Construction Contract Between City and Contractor; (3) the Conditions of the Contract (General, Supplementary, and Special, if applicable); (4) all Exhibits to the Contract; (5) the Drawings; (6) the Specifications; (7) all Addenda issued prior to the execution of the Construction Contract; (8) all Modifications issued after the execution of the Construction Contract; and (9) Governmental Approvals, if any, including but not limited to, permits.

Page 5 of 133 ends

I. Change Order. A Change Order is a written document prepared by the City reflecting the agreement between the City and Contractor for: a change in the terms or conditions of the Contract, if any; a specific Scope Change in the Work; the amount of the adjustment, if any, in the Contract Sum; and the extent of the adjustment, if any, in the Contract Time.

J. Change Order Request (COR). A Change Order Request is a written document originated by the Contractor, which describes an instruction issued by the City after the effective date of the Contract, which Contractor believes to be a scope change that may result in changes to the Contract Sum or Contract Time or, which describes the need for or desirability of a change in the Work proposed by Contractor.

K. City or Owner. The City of Vernon, California, acting through its City Council or other City officials authorized to act for the City, acting in its proprietary rather than regulatory capacity in connection with the Project.

L. Construction Change Directive. A written order prepared and signed by the City directing a change in Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both.

M. Contract Documents. The Contract Documents are enumerated in the Construction Contract between City and Contractor and consist of: (1) the Bidding Requirements; (2) the Construction Contract; (3) the Conditions of the Contract (General, Supplementary, and Special, if applicable); (4) all Exhibits to the Contract; (5) the Drawings; (6) the Specifications; (7) all Addenda issued prior to the execution of the Contract; (8) all Modifications issued after the execution of the Contract; and (9) Governmental Approvals, including, but not limited to, permits. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

N. Contract. The Contract Documents form the Contract for Construction. The Contract Represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified on by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind between any persons or entities other than the Owner and the Contractor.

There shall be no third party beneficiaries of the Contract Documents.

O. Contract Sum. The total amount of compensation stated in the Construction Contract that is payable to Contractor for the complete performance of the Work in accordance with the Contract Documents.

P. Contract Time. The total number of days set forth in the Construction Contact within which Substantial Completion of the Work must be achieved beginning with the Date of Commencement established in the Notice to Proceed, subject to adjustments in accordance with the terms of the Contract Documents. The Contract Time for Contractor's performance of the Work is measured in calendar days (not work days).

Q. Contractor. The individual, partnership, firm, corporation, joint venture or other legal entity with whom the Contract is made by City, or the agent or legal representative who may be appointed to represent such individual, partnership, firm, corporation, joint venture or other legal entity in the execution of the Contract as general contractor for construction of the Work.

Page 6 of 133 ends

R. Correction Period. Correction Period is synonymous with the terms of the correction guarantee period used in the Contract Documents.

S. Date of Commencement. The date for commencement of the Work fixed by City in a Notice to Proceed to Contractor.

T. Day. The terms “day” or “days” mean calendar days unless otherwise specifically designated in the Contract Documents. The term “Work Day” or “Working Day” shall mean any calendar day except Saturdays, Sundays and City recognized legal holidays. City Holidays are as follows:

1. January 1st – New Year’s Day

2. The 3rd Monday in January – Martin Luther King, Jr. Day

3. The 3rd Monday in February – Presidents Day

4. March 31st – Cesar Chavez Day

5. The last Monday in May – Memorial Day

6. July 4th – Independence Day

7. The first Monday in September – Labor Day

8. The second Monday in October – Indigenous Peoples’ Day

9. November 11th – Veterans Day

10. The 4th Thursday in November – Thanksgiving Day

11. December 24th – Christmas Eve

12. December 25th – Christmas Day

13. December 31st – New Year’s Eve
U. Director. The Director of the Public Works Department of the City of Vernon or his/her duly appointed representative.

V. Drawings. The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location, and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.

W. Extra Work. New or unforeseen work will be classified as Extra Work when determined by the City that the work is not described in, or reasonably inferable from, the Contract Documents, the work is not covered by any Bid line item or Allowance, and the work causes Contractor to incur additional and unforeseen costs.

X. Field Directive. See, “Work Directive.”
Y. Final Completion. Final Completion is the stage of performance of the Work when (1) all Work required by the Contract Documents has been fully completed in compliance with the Contract Documents and all applicable laws including, but not limited to, correction or completion of all punch list items noted by City upon Substantial Completion; (2) Contractor has delivered to City an Application for Final Payment and all closeout documentation required by the Contract Documents; and (3) documentation of all final Governmental Approvals has been submitted to City including, but not limited to a final Certificate of Occupancy or equivalent Building Department sign-off has been issued covering the entire Project site without exception or conditions.

Z. Force Majeure. “Force Majeure” includes but is not limited to declared or undeclared war, sabotage, insurrection, riot, or other acts of civil disobedience, labor disputes, fires, explosions, floods, earthquakes or other acts of God.

Page 7 of 133 ends

AA. Fragnet. The sequence of new activities that are proposed to be added to an existing schedule.

BB. Governmental Approval. Any approval, authorization, inspection, certification, consent, exemption, filing, permit, registration, plan check, ruling or similar authorization required by any federal, state or local law, regulation or procedures in order for Contractor to perform the Work.

CC. Guarantee. Assurance to City by Contractor or product manufacturer or other specified party, as guarantor, that the specified warranty will be fulfilled by the guarantor in the event of default by the warrantor.

DD. Modification. A Modification is: (1) a written amendment to Contract signed by both parties; (2) a Change Order; or (3) a Construction Change Directive.

EE. Notice to Proceed. The Notice to Proceed is a document issued by the City fixing the date for Commencement for the Work.

FF. Parties. The City and Contractor may be referred to in the Contract Documents from time to time as the Parties.

GG. Permit Fees. The actual direct costs paid by Contractor for Governmental Approvals and Utility Fees.

HH. Permit Fees Reimbursement. A payment made to the Contractor by the City in addition to the Contract Sum to compensate Contractor for the actual direct cost of all Permit Fees.

II. Project. The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the City or by separate contractors.

JJ. Project Manual/Contract Package. The volumes of Contract Documents and reference documents assembled for the Work made available to Bidders.

KK. Record Documents. The Drawings, Specifications, addenda, requests for information, bulletins, Change Orders and other modifications to the Contract Documents, approved shop drawings, product data, samples, mock-ups, permits, inspection reports, test results, daily logs, schedules, subcontracts, and purchase orders. Records Documents shall include a set of “As-Built” Drawings and Specifications, which shall be continuously updated during the prosecution of the Work.

LL. Site. The physical area designated in the Contract Documents for Contractor's performance of the Work.

MM. Specifications. The Specifications are the volume(s) assembled for the Work that includes, without limitation, the Bidding Documents, the Construction Contract and Exhibits, the General Conditions, Supplementary and/or Special Conditions, if any, the “GREENBOOK” STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (2012 Edition), the Standard Plans for Public Works Construction (2009 Edition), State of California, Department of Transportation Standard Plans and Standard Specifications (2010 Edition), and the City of Vernon Standard Plans.

NN. Specifications. The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards, and workmanship for the Work

Page 8 of 133 ends

and performance of related services, including, but not limited to, the Project Technical Specifications, Standard Specifications, if any, and any applicable Trade Association Specifications.

OO. Substantial Completion. Substantial Completion is defined to mean the stage in the progress of the Work when the Work is sufficiently complete in accordance with the Contract Documents as determined by the City so that the City can occupy and utilize the Work for its intended use and as further defined in the Contract Documents.

PP. Unilateral Change Order. See “Work Directive.”
QQ. Utility Fees. The fees charged by any public, private, cooperative, municipal and/or government line, facility or system used for the carriage, transmission and/or distribution of cable television, electric power, telephone, water, gas, oil, petroleum, steam, chemicals, sewage, storm water or similar commodity including, but not limited to fees for temporary utilities and refuse hauling.

RR. Warranty. Assurance to City by contractor, installer, supplier, manufacturer or other party responsible as warrantor, for the quantity, quality, performance and other representations of a product, system service of the Work.

SS. Work. The term "Work" means the construction and other services required by, and reasonably inferable from the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project.

TT. Work Directive. A Work Directive is a unilateral written order issued by the City directing Contractor to continue performance of the Work or to perform a disputed change in the Work prior to agreement or adjustment, if any, in the Contract Sum, Contract Time, or both.

1.02 REPRESENTATIVES
A. The Director shall be the representative of the City and, except as otherwise expressly provided herein, shall make all decisions and interpretations to be made by the City under the provisions of the Contract Documents.

B. The Contractor shall at all times be represented on the Work in person or by a duly designated agent.

Instructions and information given by the Director to the Contractor's agent on the Work shall be considered as having been given to the Contractor.

1.03 PERMITS, INSPECTIONS, PLAN CHECKS, AND SIMILAR GOVERNMENTAL APPROVALS AND

UTILITIES
A. Except as otherwise provided in the Notice Inviting Bids, the Contractor shall apply for, obtain, and pay for all permits including, but not limited to, building or structure permits, plumbing system permits, mechanical system permits, electrical system permits, structural system permits, demolition permits, excavation permits, street use permits, driveway permits, sidewalk, curb, sewer, gutter, crosswalk, paving or other street work grading permits, street/utility use permits, OSHA permits, fire sprinkler permits, fence permits, blasting permits, landscaping/irrigation permits, and permits to demolish, remove, or make major alterations to any designated historic resource; inspections; and plan checks obtained after the Date of Commencement of the Work. The Notice Inviting Bids contains a list of permits and other Governmental Approvals and Utility Fees obtained and paid for by the City prior to the Date of Commencement; Contractor is responsible for obtaining all Governmental Approvals and

Page 9 of 133 ends

Utility Fees not listed in the Notice Inviting Bids.

B. Contractor shall obtain a no-fee encroachment permit from the City of Vernon’s Public Work, Water and Development Services Department.

C. All documents evidencing Contractor’s satisfaction with all Governmental Approvals and Utility Fees must be submitted to the City prior to submission of the Application for Final Payment.

D. Where requirements of the Governmental Approvals differ from those of the Drawings and Specifications, the more stringent requirements shall apply.

E. Unless otherwise specified in the Contract Documents, Contractor shall be responsible for payments of all Utility Fees from the Date of Commencement until City’s Final Acceptance of the Work.

1.04 LICENSES
The Contractor shall apply for, obtain, and pay for all licenses required by governing authorities for the Work.

Contractor shall apply and pay for a City of Vernon business license.

1.05 ALLOWANCES
A. Contractor shall include in the Contract Sum and Schedule of Values for Payment, the City’s estimated cost established for each Work item covered by an Allowance stated in the Contract Documents. See Paragraph 1.01 for definition of Allowance.

B. The line item cost estimate established by the City for Work covered by an Allowance includes the cost to Contractor of: all materials and equipment, preparation of submittals; labor; transportation; delivery; handling; installation; supervision; overhead; profit; licenses; bonds; insurance; all sales, use and other taxes legally chargeable; and all other costs and expenses incidental to such Work.

C. Work items covered by Allowances shall be supplied with such materials and equipment and for such prices approved in advance by City. Contractor shall notify and request City’s approval of material equipment, and pricing information for Work covered by an Allowance before ordering the material or equipment and in sufficient time to avoid delay to the Work. City shall provide approval of materials, equipment, and prices with reasonable promptness. The material, equipment, and pricing information submitted by the Contractor to the City’s Project Manager shall, at a minimum, include product data and detailed costs of material, equipment, and labor to complete such Work, itemized by costs incurred by Contractor and each subcontractor associated with the performance of such Work. Contractor shall

Page 10 of 133 ends

not order materials or equipment or proceed with Work covered by an Allowance until the material, equipment, and pricing information for such Work items have been submitted to the City’s Project Representative for review and the Contractor has received City’s approval to proceed with a Work item covered by an Allowance.

D. All expenditures for Allowance Work shall be separately itemized in each Application for Payment.

E. To the extent that the cost of Work items covered by an Allowance is less than the Allowance cost estimate established by the City, the Contact Sum shall be reduced by Change Order or Construction Change Directive to reflect the actual cost of the Allowance item. Similarly, to the extent the cost of Work items covered by an Allowance is greater than the Allowance cost estimate, the Contract Sum shall be increased by Change Order or Construction Change Directive to reflect the actual cost of the Allowance item. If Work items covered by an Allowance are not performed or the City deletes such items from the Scope of Work, the Contract Sum shall be reduced by Change Order or Construction Change Directive to deduct the Cost of the unused Allowance item.

1.06 WAIVER
A waiver by City of any breach of any term, covenant, or condition contained in the Contract Documents shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained therein, whether of the same or a different character.

1.07 DATA TO BE FURNISHED BY THE CONTRACTOR
The Contractor shall furnish the Director with such information as the Director may desire respecting the character of the materials and the progress and manner of the Work, including all information necessary to determine the Contractor’s costs, such as the number of persons employed, their pay, the time during which they worked on the various classes of construction, and other pertinent data.

1.08 CONTRACT DRAWINGS
The City will accept no responsibility for errors resulting from misinterpretation or scaling of the Drawings.

1.09 SPECIFICATIONS AND DRAWINGS
A. The Contractor shall keep on the Work Site a copy of all Specifications, Drawings, and Change Orders pertaining to the Work and shall at all times give the Director access thereto. Anything mentioned in the Specifications and not shown on the Drawings or shown on the Drawings and not mentioned in the Specifications shall be of like effect as though shown or mentioned in both.

B. In general, the Drawings will show dimensions, positions, and kind of construction; and the Specifications will define materials, quality, and standards. Any Work not particularly detailed, marked or specified, shall be the same as similar parts that are detailed, marked or specified.

C. The Drawings shall not be scaled to determine dimensions, and in all cases shall be calculated from figures shown on the Drawings. Any discrepancies between scale and figured dimensions, not marked “not to scale,” must be brought to the Director’s attention before proceeding with the Work affected by the discrepancy.

D. Omissions from the Drawings and/or Specifications shall not relieve the Contractor from the

Page 11 of 133 ends

responsibility of furnishing, making, or installing all items required by law or code, or usually furnished, made or installed in a project of the scope and general character indicated by the Drawings and Specifications.

E. For convenience, the Drawings and Specifications may be arranged in various trade subparagraphs, but such segregation shall not be considered as limiting the Work of any subcontract or trade. The Contractor shall be solely responsible for all subcontract arrangements of the Work regardless of the location or provision in the Drawings and Specifications.

F. The City will furnish free of charge to the Contractor, a maximum of six (6) sets of Contract Drawings and Specifications. The Contractor shall pay for the costs of any additional sets or portions thereof.

The Contractor shall be responsible to see that all sets are the same as the up-to-date approved set.

1.10 PRECEDENCE OF CONTRACT DOCUMENTS
A. In the event of conflict between any of the Contract Documents, the provisions placing a more stringent requirement on the Contractor shall prevail. The Contractor shall provide the better quality or greater quantity of Work and/or materials unless otherwise directed by City in writing. In the event none of the Contract Documents place a more stringent requirement or greater burden on the Contractor, the controlling provision shall be that which is found in the document with higher precedence in accordance with the following order of precedence:

1. Governmental Approvals including, but not limited to, permits required for the Work

2. Modifications issued after execution of the Contract (including modifications to Drawings and Specifications)

3. The Contract, including all exhibits, attachments, appendices and Addenda, with later Addenda having precedence over earlier Addenda

4. Special Conditions, if any

5. General Conditions

6. Specifications

7. Drawings

8. Bidding Requirements
B. With reference to the Drawings, the order of precedence is as follows:

1. Change Order Drawings

2. Addenda Drawings

3. Contract Drawings

4. Project Drawings

5. Standard Drawings

6. Detail Drawings

7. General Drawings

8. Figures

9. Scaled dimensions
C. Within the Specifications, the order of precedence is as follows:

1. Change Orders

2. Special Conditions

3. Project Technical Specifications

Page 12 of 133 ends

4. Standard Specifications, if any

5. Applicable Trade Association Specifications

1.11 NOTICE OF CONFLICTS
If the Contractor, in the course of the Work, becomes aware of any claimed conflicts, errors or omissions in the Contract Documents or in the City's fieldwork or work of City's separate contractors, the Contractor shall immediately notify the Director in writing. The Director shall promptly review the matter, and if the Director finds a conflict, error or omission, the Director shall determine the corrective actions and advise the Contractor accordingly. If the correction associated with a conflict, error or omission increases or decreases the amount of Work called for in the Contract, the City shall issue an appropriate Change Order in accordance with the Contract Documents. After discovery of an error or omission by the Contractor, any related additional work performed by the Contractor shall be done at the Contractor's risk unless authorized by the Director.

1.12 REPORTS
A. Daily Construction Reports: The Contractor shall prepare a daily construction report recording the following information concerning events at Project site:

1. List of Subcontractors at Project site.

2. List of other contractors at Project site.

3. Approximate count of personnel at Project site.

4. Equipment at Project site.

5. Material deliveries.

6. High and low temperatures and general weather conditions, including presence of rain or snow.

7. Accidents.

8. Meetings and significant decisions.

9. Unusual events.

10. Stoppages, delays, shortages, and losses.

11. Meter readings and similar recordings.

12. Emergency procedures.

13. Orders and requests of authorities having jurisdiction.

14. Change Orders received and implemented.

15. Construction Change Directives received and implemented.

16. Services connected and disconnected.

17. Equipment or system tests and startups.

18. Partial completions and occupancies.

19. Substantial Completions authorized.

20. List of visitors to Project Site.

21. List of personnel at Project Site including names and job classifications.

22. Description of Work for the day including locations, quantities and related bid items.

Page 13 of 133 ends

Immediately upon discovery of a difference between field conditions and the Contract Documents, the Contractor shall prepare and submit a detailed report through a Request for Information (RFI). Include a detailed description of the differing conditions, together with recommendations for a remedy.

The Daily Construction Report must be: signed by Contractor’s Superintendent, submitted within 24 hours (next Working Day) to the Director, and shall be made available to others as directed by City.

1.13 LINES, GRADES, AND MEASUREMENTS
A. All lines and grades will be established by the Contractor. The Contractors shall carefully preserve all survey stakes and reference points as far as possible. Should any stakes or points be removed or destroyed unnecessarily by any act of the Contractor or his/her employees, they must be reset to the satisfaction of the Director, at the Contractor's expense.

B. The Contractor shall inform the Director 48 hours (two Work Days) in advance of the times and places at which he/she intends to Work in order that inspection may be provided, and that necessary measurements for records and payments may be made with minimum inconvenience.

C. No direct payment will be made for the cost to the Contractor of any of the Work or delay occasioned by giving lines and grades, by making other necessary measurements, or by inspection.

1.14 RIGHT OF WAY
A. The site for the installation of equipment or the right of way for the Work to be constructed under this Contract will be provided by the City.

B. The City will provide the appropriate rights of way and property for pipelines and structures. Upon approval by the Director, the Contractor may, without cost, use portions of any of the City's rights of way or property which may be suitable for working space and for storage of equipment and materials. The Contractor will be held responsible for any damage to structures, streets, and roads, trees and landscaping, and for any damage that may result from his/her use of City property.

C. In case areas additional to those available on the City's rights of way or property are required by the Contractor for his/her operations, he/she shall make arrangements with the property owners for the use of such additional areas at his/her own expense.

1.15 CONTRACTOR’S OPERATIONS/STORAGE YARD
In the event the Contractor requires space for the storage and/or staging of construction materials, supplies, equipment, stockpiling of debris, or any other needs required for construction operations, he/she shall acquire at his/her own expense such areas as he/she may desire. For properties within the City of Vernon, the staging area must be enclosed at Contractor’s expense with construction fencing covered with a mesh screen to limit visibility to the site. Private property used for storage of construction material or debris shall be restored to a legal condition with regard to appearance and maintenance upon conclusion of the project. Property should be graded and free of weeds and debris when project is completed. [END OF ARTICLE]

Page 14 of 133 ends

ARTICLE 2 - PERFORMANCE OF THE WORK

2.01 PERFORMANCE OF WORK - GENERAL
Contractor shall, at its own cost and expense, furnish all necessary materials, labor, transportation, and equipment for doing and performing said Work and the materials used shall comply with the requirements of the Contract Documents. All Work shall be performed and completed as required in the Contract Documents, and subject to the approval of the Director, or his/her designated assistant.

2.02 NO ASSIGNMENT OR DELEGATION
Contractor shall not assign or delegate the duties or obligations under this Contract or his/her interest therein in whole or in part without the prior written consent of the City which may be withheld at the City's sole discretion.

2.03 STANDARD OF PERFORMANCE
Contractor agrees that all services performed hereunder shall be provided in a manner commensurate with the highest professional standards and shall be performed by qualified and experienced personnel; that any Work performed by Contractor under the Contract will be performed in the best manner; that any material furnished shall be subject to the approval of the Director; and that both Work and materials will meet fully the requirements of the Contract Documents. Any work deemed unacceptable by the Director, whether a cause is determined or not shall be repaired or replaced by Contractor at Contractor’s expense.

The Contractor shall be responsible for the final product and shall make any quality control, adjustments and corrections necessary to obtain the final product accepted by the City Engineer. The Contractor shall perform process and quality control sampling and testing and exercise management control the work of his/her subcontractors, technicians and workers to ensure that the milling, transporting, recycling, spreading, compaction, and finishing processes conform to these Specifications. The proficiency of testing laboratories and sampling and testing personnel shall be reviewed and approved by the City Engineer prior to providing services to the project. The City Engineer shall have unrestricted access to the laboratory, sampling, testing sites, and all information resulting from mix design and quality control activities. All Quality Control testing results shall be submitted to the City Engineer on a daily basis.

2.04 DEFECTIVE WORK
Within the time periods that the City specifies, the Contractor shall correct all deficient, improperly executed, or unsatisfactory Work determined by the City.

The Contractor shall remove and shall repair or replace, at his/her own expense any part of the Work that is deficient, improperly executed, or unsatisfactorily executed, even though it has been included in the monthly estimates. If he/she refuses or neglects to remove, repair, or replace such defective Work, prior to the City’s acceptance of the Work, it may be replaced by the City at the expense of the Contractor, plus 15% for overhead expenses, and his/her sureties shall be liable therefor. (See Paragraph 2.15 for curing defects after acceptance of the Work.)

2.05 CITY’S RIGHT TO CARRY OUT THE WORK
A. Notwithstanding other remedies available to the City, if the Contractor defaults, fails to perform Work required by the Contract Documents, or otherwise neglects to carry out the Work in accordance with the Contract Documents and fails within a 48 hour period after receipt of written notice from the City to commence and correct such default, failure to perform, or neglect with diligence and promptness, the

Page 15 of 133 ends

City, at its sole discretion and without obligation, may, with its own or outside forces, perform the Work Contractor has failed to perform and/or replace or correct deficiencies in the Work. In such case, a Change Order or Construction Change Directive shall be issued deducting from payments then or thereafter due to the Contractor the cost of completion, replacement or correction of such deficiencies, including compensation for additional services by the City’s project management staff, the Architect, and their respective consultants made necessary by such default, failure to perform, or neglect, plus 15% for City’s overhead expenses. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the City immediately. This remedy is cumulative.

B. The City also has the right, but not the obligation, to self-perform or have outside forces perform portions of the Work previously assigned to Contractor. In such case a Change Order or Construction Change Directive shall be issued, reducing the Contract Sum by the Unit Price(s) applicable to such deleted Work or, in the absence of Unit Prices, an amount that reflects the reasonable cost of performing such deleted Work and the Allowable Mark-Up applicable to such deleted Work.

2.06 COMMUNICATIONS AND NOTICES REGARDING THE WORK
A. Notices under the Contract Documents shall be in writing and (a) delivered personally, (b) sent by certified mail, return receipt requested, or (c) sent by a recognized overnight mail or courier service, with delivery receipt requested, to the following addresses (or to such other address as may from time to time be specified in writing by such Person):

All correspondence with Contractor shall be sent to the following address:

FS Contractors, Inc.
14838 Bledsoe St.

Sylmar, CA 91342
Attention: Jose Angel Fierros, President
Phone: (818) 974-0895
All communications shall be copied to City and shall be delivered to City’s Director at the address set forth below, with copies to such additional persons as may be directed by City’s Director.

City of Vernon
Public Works Department
4305 Santa Fe Avenue
Vernon, CA 90058
Attention: Andrew Eguia, Assistant Engineer
Phone: (323)583-8811 ext. 294
E-mail: [email protected]
B. Notices shall be deemed received when actually received in the office of the addressee (or by the addressee if personally delivered) or when delivery is refused, as shown on the receipt of the U. S.

Postal Service, private carrier or other Person making the delivery. All notices received after 5:00 p.m. shall be deemed received on the first business day following delivery. Any technical or other communications pertaining to the Work shall be conducted by Contractor's Project Manager and technical representatives designated by City. Contractor's representatives shall be available at all

Page 16 of 133 ends

reasonable times for consultation, and shall be authorized to act on behalf of Contractor in matters concerning the Work.

C. Contractor shall copy City on all written correspondence pertaining to the Contract between Contractor and any Person other than Contractor's Subcontractors, consultants and attorneys.

D. Notification of Affected Residents/Businesses. The Contractor shall be responsible for distribution of the general information letter of the project to all affected residents and businesses. A project general information letter and sufficient copies thereof will be prepared by City staff for Contractor distribution to all residents, business establishments, and institutions fronting on or directly affected by the project.

The Contractor shall be responsible for distribution of said letter in handout form to all the appropriate residences and buildings in the subject area. Distribution shall be accomplished in a manner acceptable to the City Engineer and shall be five (5) working days prior to the beginning of construction operations in the immediate vicinity. In addition to the above, the Contractor shall be fully responsible for such other notifications as may be required related to necessary closures of streets, alleys, driveways, etc., or to unavoidable access or parking restrictions. These notifications shall apply where the closures and access or parking restrictions required in the performance of any work under this contract preclude any resident, tenant, or property owner from utilizing the premises or conducting business thereon in a reasonable and customary manner.

Additional notification to the affected businesses and residents shall be prepared by the City and distributed by the Contractor for roadway and driveway closures five (5) working days in advance of any construction work. No removal or excavation work is allowed until the additional notification has been distributed to the affected residents and businesses.

If a Contractor is unable to adhere to his schedule as indicated on his written notification, then all the affected residents and places of business shall be re-notified of the revised schedule, in writing, as indicated above.

Contractor costs for all of the above notifications shall be considered as included in the appropriate items of the Bid Proposal.

E. Notification of Utilities – The provisions of Section 5 entitled "Utilities" of the “Greenbook” Standard Specifications shall apply. The Contractor shall contact the Underground Service Alert of Southern California (U.S.A.) at least two working days in advance of the construction work

2.07 INDEPENDENT CONTRACTOR
The Contractor in the performance of the Work hereunder will be acting in an independent capacity and not as an agent, employee, partner, or joint venture of the City.

2.08 EMERGENCY WORK
A. During Working Hours:

In case of an emergency which threatens loss or injury of property, and/or safety of life during working hours, the Contractor shall act, without previous instructions from the City, as the situation may warrant.

He/she shall notify the Director of the emergency and the action taken immediately thereafter.

Any compensation claimed by the Contractor, together with substantiating documents in regard to

Page 17 of 133 ends

expense, shall be submitted to the Director within 15 calendar days after the emergency.

Compensation, if allowed, will be paid for as Extra Work.

B. Outside of Working Hours:

Whenever, in the opinion of the City, there shall arise outside of the regular Working hours on the Contract Work of an emergency nature which threatens loss or injury of property, or danger to public safety, the Contractor shall act, without previous instructions from the City as the situation may warrant. He/she shall notify the Director of the emergency and the action taken immediately thereafter. Any compensation claimed by the Contractor, together with substantiating documents in regard to expense, shall be submitted to the Director within 15 calendar days after the emergency.

Compensation, if allowed, will be paid for as Extra Work. In the event the Contractor is not able to respond to an emergency outside of regular working hours, the City's forces will handle such emergency Work. If such emergency arises out of or is the result of operations by the Contractor, the cost of the corrective measures will be billed to the Contractor and deducted from his/her payment as provided in the Contract Documents. The performance of emergency Work by City forces will not relieve the Contractor of any of his/her responsibilities, obligations, or liabilities under the Contract.

2.09 SUBCONTRACTORS
A. Each subcontract shall contain a reference to the Contract between the City and the principal Contractor, and the terms of the Contract and all parts thereof shall be made part of each subcontract insofar as applicable to the Work covered thereby. If, in the Director’s opinion, the Subcontractor fails to comply with the requirements of the principal Contract insofar as the same may be applicable to the Subcontractor’s Work, the Director may disqualify the Subcontractor.

B. Nothing contained in these Contract Documents shall be construed as creating any contractual relationship between any Subcontractor and the City.

C. The Contractor shall be considered the employer of the Subcontractors and shall be fully responsible to the City for the acts and omissions of Subcontractors and of persons employed by them as the Contractor is for the acts and omissions of persons directly employed by him/her.

D. The Contractor shall be responsible for the coordination of the trades, Subcontractors, and material suppliers engaged upon the Work. It shall be the Contractor’s duty to see that all of his/her Subcontractors commence their Work at the proper time and carry it on with due diligence so that they do not delay or injure either the Work or materials; and that all damage caused by them or their workers is made good at his/her expense.

E. The City will not undertake to settle differences between the Contractor and his/her Subcontractors or between subcontractors.

F. The Contractor shall utilize the services of specialty Subcontractors, without additional expense to the City, on those parts of the Work which are specified to be performed by specialty contractors.

2.10 USE OF FACILITIES PRIOR TO COMPLETION OF CONTRACT
A. Whenever in the opinion of the Director any Work under the Contract, or any portion(s) thereof, is in a condition suitable for use by the City, the City may, after written notice and designation from the Director to the Contractor, use (which includes, but is not limited to, taking over or placing into

Page 18 of 133 ends

service) any portion(s) designated by the Director.

B. The use of any portion(s) by the City shall not be construed as, and will not constitute acceptance in any sense, of any portion(s) of the Work of the Contractor nor will such use trigger the running of any warranty and/or guarantee periods.

C. All necessary repairs, renewals, changes, or modifications in the Work or any portion thereof so used, not due to ordinary wear and tear, but due to defective materials or workmanship, the operations of the Contractor, or any other cause, shall be made at the expense of the Contractor.

D. The use of any portion(s) by the City shall not relieve the Contractor of any of his/her responsibilities or liabilities under the Contract nor constitute a waiver by the City of any of the conditions thereof.

Said use shall not cancel liquidated damages as of the first date of use, or any continuance thereof, nor impair, reduce, or change the amount of liquidated damages.

2.11 COOPERATION WITH OTHER WORK FORCES
A. The City reserves the right to perform other Work at or near the site at any time by the use of its own forces or other contractors.

B. Other contractors, other utilities and public agencies or their contractors, other City contractors, and City personnel may be working in the vicinity during the project construction period. There may be some interference between these activities and the Work under the Contract Documents. The Contractor shall cooperate and coordinate his/her Work with that of other Work forces to assure timely Contract completion.

2.12 AGREEMENTS WITH PROPERTY OWNERS
Agreements with property owners for storing excavated material, storing any other materials, or for any other purpose related to the Work shall be made in writing and a copy submitted to the Director for his/her information. All storage charges shall be at the Contractor’s sole expense.

2.13 PROTECTION OF PROPERTY
All public and private property, pavement or improvement, shall be safely guarded from damage or loss in connection with this Contract by the Contractor at all times. Should any facility, structure, or property be damaged during operations of the Contractor, he/she shall immediately notify the property owners or authorities. All damages and losses incurred shall be paid by the Contractor.

2.14 CONTRACTOR'S RESPONSIBILITIES FOR LOSSES OR LIABILITIES A. Risk of Loss
Except as otherwise provided in the Contract Documents and except as to the cost of repair or restoration of damage to the Work caused by force majeure, the Contractor shall bear all losses resulting to him/her on account of the amount or character of the Work, or from any unforeseen obstructions or difficulties which may be encountered, or from any encumbrances on the line of the Work, or because the nature of the ground in or on which the Work is done is different from what is assumed. The Contractor shall bear the risk for any City equipment, material, or supplies with which he/she has been entrusted.

Page 19 of 133 ends

B. Materials and Facilities
The Contractor shall be responsible for materials and facilities as hereinafter provided and in the event of his/her failure to carry out said responsibilities, the same may be carried out by the City at the expense of the Contractor:

1. The Contractor shall be responsible for any materials so furnished and for the care of all Work until its completion and final acceptance, and he/she shall at his/her own expense replace damaged or lost materials and repair damaged parts of the Work.

2. The Contractor shall protect City facilities from damage resulting from his/her Work. City facilities damaged by, or as a result of, the Contractor's Work under this Contract shall be repaired or replaced, as directed by the Director, at the Contractor's expense.

3. The Contractor shall remove from the vicinity of the completed Work all buildings, rubbish, unused material, concrete forms, and other materials belonging or used under his/her direction during construction. If Contractor fails to completely remove such items within a reasonable time the City may do so at the Contractor’s expense.

C. Laws and Regulations

1. The Contractor shall obey all laws, ordinances, and regulations in any manner affecting those engaged or employed on the Work, or the materials used in the Work, or in any way affecting the conduct of the Work, and of all court orders and decrees having any jurisdiction or authority over the same. If any discrepancy or inconsistency should be discovered in this Contract, or in the Drawings or Specifications herein referred to, in relation to any such law, ordinance, regulation, order, or decree, he/she shall immediately report the same in writing to the Director.

2. Contractor shall, at all times, cause all his/her agents and employees to observe and comply with all such applicable laws, ordinances, regulations, orders, and decrees in effect or which may become effective before Final Completion of this Contract.

3. Nothing in the Contract Documents shall be construed to permit Work not conforming to such laws, ordinances, and regulations. If the Contractor ascertains at any time that any requirement of this Contract is at variance with such applicable law requirement, he/she shall immediately notify the Director.

4. If such applicable law requirement was not in effect on the date of submission of bids, any necessary adjustment of the Contract price shall be made as provided in Article 6 herein. If such applicable law requirement was in effect on said date of bid submission, no adjustment of Contract price will be considered.

5. The Contractor, at his/her own expense, shall pay all taxes properly assessed against his/her equipment, materials, or property used or required in connection with the Work.

2.15 WARRANTY AND CORRECTIONS
A. Warranty

1. Warranty. The Contractor warrants to the City that: (i) materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by

Page 20 of 133 ends

the Contract Documents; (ii) the Work will be of good quality and free from defects; (iii) the Work will conform to the requirements of the Contract Documents; and (iv) Contractor will deliver the Project free of stop notice claims. Work not conforming to these requirements, including substitutions not accepted by the City, will be deemed defective. The Contractor’s warranty excludes improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the City, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the correction obligation of Paragraph 2.04 herein.

2. Overlap. Where any warranties provided under the Contract Documents overlap, conflict, or are duplicative, Contractor will be bound by the more stringent requirements.

3. Procurement and Assignment of Warranties: Contractor shall obtain in the name of City, or transfer or assign to City or City’s designee prior to the time of Final Completion of the Work, any and all warranties or guarantees which Contractor is required to obtain pursuant to the contract Documents and which Contractor obtained from any other person or entity other than Contractor including, but not limited to, Subcontractors and manufacturers, and further agrees to perform the Work in such a manner so as to preserve any and all such warranties.

Contractor shall secure written warranties from all Subcontractors. Contractor and its Subcontractors shall offer any warranty upgrades or extensions that are offered by manufacturers of any equipment or system installed in the Work to the City. Contractor shall deliver to City all warranty and guarantee documents and policies.

4. Survival of Warranties: The provisions of this paragraph 2.15 will survive Contractor’s completion of the Work or termination of Contractor’s performance of the Work.

B. Correction of Work

1. Before or After Final Completion. The Contractor shall promptly correct Work rejected by the City or City’s designee, as failing to conform to the requirements of the Contract Documents, whether discovered before or after Final Completion and whether or not fabricated, installed, or completed. Costs of correcting such rejected Work, including additional testing, inspections, and compensation for the City’s services and expenses made necessary thereby, will be at the Contractor’s expense within the Contract Price.

2. After Final Completion.
(a) In addition to the Contractor’s warranty obligations under Paragraph 2.15-A, if, within one (1) year after the date of Final Completion of the Work or within the time period established by any applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall commence correction or replacement of such Work within forty-eight (48) hours after receipt of written notice from the City to do so. The Contractor shall perform such corrective work without charge or cost to the City after Final Completion of the Work. The City shall give such notice promptly after discovery of the condition. (b) If the Contractor fails to commence correction or replacement of non-conforming Work within forty-eight (48) hours after receipt of written notice, the City will proceed to have defects repaired or replaced at the expense of the Contractor and its Performance Bond surety, plus fifteen percent (15%) for the City’s overhead

Page 21 of 133 ends

and administrative expense. The City may charge such costs against any payment due Contractor. If, in the opinion of the City, defective work creates a dangerous or hazardous condition or requires immediate correction or attention to prevent further loss to the City or to prevent interruption of operations of the City, the City may take immediate action, give notice, make such correction, or provide such attention and the cost of such correction or attention will be charged against the Contractor. Such action by the City will not relieve the Contractor of the warranties provided in this Article or elsewhere in the Contract Documents.

3. Replacement or Removal of Defective or Unauthorized Work. The Contractor shall remove from the Site and replace those portions of the Work which are not in accordance with the requirements of the Contract Documents in a manner acceptable to and as ordered by the Director. No compensation shall be allowed for such removal or replacement. Director shall have authority to cause defective work to be remedied, removed or replaced and to deduct the costs from monies due or to become due to the Contractor.

4. Destruction or Damage. In the event the Contractor destroys or damages any construction of the City or another contractor while correcting or removing Work which is not in accordance with the requirements of these Contract Documents, the Contractor shall bear the cost of repairing or reconstructing that other construction as well.

5. No Limitation. Nothing contained in Paragraph 2.15-B will be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Documents. Establishment of the one-year period for correction of Work as described in Paragraph 2.15-B relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the limitations periods established by statute for any construction defect or other causes of action.

2.16 CLEANING AND ENVIRONMENTAL CONTROLS
The Contractor, Subcontractors and employees shall comply with all litter and pollution laws and it shall be the responsibility of the Contractor to ensure compliance. The Contractor shall do all of the following:

A. Maintain the Site free of waste materials, debris, and rubbish and in a clean and orderly condition; and Remove waste materials, debris and rubbish from site and dispose off-site legally.

B. The Contractor shall maintain at his/her disposal any and all equipment necessary to prevent and remediate any sanitary sewer overflow arising out of the Work. The Contractor shall furnish and operate a self-loading motor sweeper with spray nozzles, as directed by the Director, to maintain the affected areas in a condition of cleanliness acceptable to the City at all locations affected by the Contractor’s operations. For purposes of this Paragraph, the affected areas include the project Site as well as all haul routes to and from the project Site and all areas of construction and restoration which have not been completed.

C. The Contractor shall take appropriate action to ensure that no dust originates from the project Site.

D. Any equipment or vehicles driven and/or operated within or adjacent to a street gutter, storm drain, runoff conveyance or ocean shall be checked and maintained daily to prevent leaks of materials that if introduced to water could be deleterious to aquatic life.

E. No debris, soil, silt, sand, bark, trash, sawdust, rubbish, cement or concrete or washings thereof, oil or

Page 22 of 133 ends

petroleum products or other organic or earthen material from any construction, or associated activity or whatever nature shall be allowed to enter into or placed where same may be washed by rainfall or runoff into waters of the State. When operations are completed, any excess materials or debris shall be removed from the Work area.

2.17 WATER POLLUTION CONTROL
A. The Contractor shall meet all applicable City of Vernon, state and federal clean water laws, rules and regulations including but not limited to all conditions set forth in the Vernon Municipal Code Chapter 21, Article 5 regarding stormwater and urban runoff controls as it relates to public agency activities including, but not limited to storm and/or sanitary sewer system inspection and repair, street sweeping, trash pick-up and disposal, and street and right-of-way construction and repair are required to implement and maintain the activity specific Best Management Practices (BMPs) listed in Table 2-1 below in compliance with the National Pollutant Discharge Elimination System (NPDES) requirements. Contractor shall not discharge any water containing trash, debris, pollutants, fuels, oils, soaps or other non-allowable constituents from its sweeping vehicles upon any city street, to any storm drain or any non-permitted outlet. As part of its submission, contractor shall describe its methods for preventing NPDES violations during sweeping operations within the City. In addition, Contractor shall comply with all NPDES requirements at its maintenance facilities, storage yards and company facilities. Failure to comply with this section may result in termination for cause by the City of any contract resulting from this solicitation.

Table 2-1. BMPs for Public Agency Facilities and Activities General and Activity Specific BMPs
General BMPs
Scheduling and Planning
Spill Prevention and Control
Sanitary/Septic Waste Management
Material Use
Safer Alternative Products
Vehicle/Equipment Cleaning, Fueling and Maintenance
Illicit Connection Detection, Reporting and Removal
Illegal Spill Discharge Control
Maintenance Facility Housekeeping Practices
Flexible Pavement
Asphalt Cement Crack and Joint Grinding/ Sealing
Asphalt Paving
Structural Pavement Failure (Digouts) Pavement Grinding and Paving Emergency Pothole Repairs
Sealing Operations
Rigid Pavement
Portland Cement Crack and Joint Sealing
Mudjacking and Drilling
Concrete Slab and Spall Repair
Slope/Drains/Vegetation
Shoulder Grading
Nonlandscaped Chemical Vegetation Control
Nonlandscaped Mechanical Vegetation Control/Mowing
Nonlandscaped Tree and Shrub Pruning, Brush Chipping, Tree and Shrub Removal

Page 23 of 133 ends

Fence Repair
Drainage Ditch and Channel Maintenance
Drain and Culvert Maintenance
Curb and Sidewalk Repair
Litter/ Debris/ Graffiti
Sweeping Operations
Litter and Debris Removal
Emergency Response and Cleanup Practices
Graffiti Removal
Landscaping
Chemical Vegetation Control
Manual Vegetation Control
Landscaped Mechanical Vegetation Control/ Mowing
Landscaped Tree and Shrub Pruning, Brush Chipping, Tree and Shrub Removal Irrigation Line Repairs
Irrigation (Watering), Potable and Nonpotable
Environmental
Storm Drain Stenciling
Roadside Slope Inspection
Roadside Stabilization
Stormwater Treatment Devices
Traction Sand Trap Devices
Bridges
Welding and Grinding
Sandblasting, Wet Blast with Sand Injection and Hydroblasting Painting
Bridge Repairs
Other Structures
Pump Station Cleaning
Tube and Tunnel Maintenance and Repair
Tow Truck Operations
Toll Booth Lane Scrubbing Operations
Electrical Sawcutting for Loop Installation
Traffic Guidance
Thermoplastic Striping and Marking
Paint Striping and Marking
Raised/ Recessed Pavement Marker Application and Removal Sign Repair and Maintenance
Median Barrier and Guard Rail Repair
Emergency Vehicle Energy Attenuation Repair
Storm Maintenance Minor Slides and Slipouts Cleanup/ Repair Management and Support
Building and Grounds Maintenance
Storage of Hazardous Materials (Working Stock)
Material Storage Control (Hazardous Waste)
Outdoor Storage of Raw Materials
Vehicle and Equipment Fueling
Vehicle and Equipment Cleaning
Vehicle and Equipment Maintenance and Repair
Aboveground and Underground Tank Leak and Spill Control

Page 24 of 133 ends

B. Water Quality Protection Requirements for Construction Projects with Less than One (1) Acre of Disturbed Soil.

All construction projects, regardless of size, will be required to implement best management practices (BMPs) necessary to reduce pollutants to the Maximum Extent Practicable (MEP) to meet the minimum water quality protection requirements and implement all applicable set of BMPs as defined in Table 2-2.

Please refer to the California Stormwater Quality Association’s Construction Handbook (available on their website:
www.cabmphandbooks.com) for further information regarding the BMPs listed in Table 2-2.

All construction projects with Less than One (1) Acre of Disturbed Soil shall submit to the City a signed Statement of Intent to Comply with Minimum Requirements of the Stormwater Permit (Exhibit 5).

The Contractor may self-certify that the following training was completed on an annual basis providing they certify they have received all applicable training:
 The Contractor shall train all of their employees in targeted positions (whose interactions, jobs, and activities affect stormwater quality) on the requirements of the overall stormwater management program.

 When the Work includes the use or have the potential to use pesticides or fertilizers, the Contractor shall train all of their employees (whether or not they normally apply pesticides or fertilizers as part of their work). Training programs shall address:
1) The potential for pesticide-related surface water toxicity 2) Proper use, handling, and disposal of pesticides
Table 2-2
Minimum Water Quality Protection Requirements and Applicable Set of BMPs for All Construction Projects Category Minimum Requirements BMPs

1. Sediment Control Sediments generated on the project site shall be retained using adequate Treatment Control or Structural BMPs.

Sediment Control

2. Non-Stormwater
Management, Waste
Management and
Materials Pollution
Control
Construction-related materials, wastes, spills or residues shall be retained at the project site to avoid discharge to streets, drainage facilities, receiving waters, or adjacent properties by wind or runoff.

Non-storm water runoff from equipment and vehicle washing and any other activity shall be contained at the project sites.

Stormwater
Management; Waste
Management

3. Erosion Control Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as the limiting of grading scheduled during the wet season;
inspecting graded areas during rain events; planting and maintenance of vegetation on slopes; and covering erosion susceptible slopes.

Erosion Control

Page 25 of 133 ends

3) Least toxic methods of pest prevention and control, including Integrated Pest Management
4) Reduction of pesticide use
C. Water Quality Protection Requirements for Construction Projects with One (1) Acre (or greater) of Disturbed Soil. In addition to the minimum BMPs required in Paragraphs A and B, all construction projects where at least one (1) acre of soil will be disturbed, construction activity that results in land surface disturbances of less than one acre if the activity is part of a larger common plan of development, or the sale of one or more acres of disturbed land surface requires a Construction Activities Storm Water General Permit (2009-0009-DWQ Permit).

Prior to commencement of construction activities, the Permit Registration Documents (PRDs) must be submitted electronically in the Storm Water Multi-Application Report Tracking System (SMARTS) (http://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp). PRDs consist of the Notice of Intent, Risk Assessment, Post-Construction Calculations, a Site Map, the Storm Water Pollution Prevention Plan (SWPPP), a signed certification statement by the Legally Responsible Person (LRP), and the first annual fee.

See: http://www.swrcb.ca.gov/water_issues/programs/stormwater/construction.shtml for more information. A Waste Discharger Identification (WDID) will be emailed to the LRP after the PRDs have been submitted and are deemed complete. Construction activities cannot begin until a WDID is issued by the State Water Resources Control Board. Contractor shall bear the costs of any delays to the Project caused by a delay in obtaining its WDID.

The SWPPP shall include:

1. The name, location, period of construction, and a brief description of the project;

2. Contact information for the owner and contractor;

3. The building permit number for the project;

4. The grading permit number for the project (where applicable);

5. A list of major construction materials, wastes, and activities at the project site;

6. A list of best management practices to be used to control pollutant discharges from major construction materials, wastes, and activities;

7. A site plan (construction plans may be used) indicating the selection of BMPs and their location where appropriate;

8. Non-storm water discharges, their locations, and the BMPs necessary to prevent the discharge;

9. A maintenance and self-inspection schedule of the BMPs to determine the effectiveness and necessary repairs of the BMPs; and

10. A certification statement that all required and selected BMPs will be effectively implemented.

Within seven (7) days after the City awards the Contract, the Contractor shall submit seven (7) copies of the proposed SWPPP to the City. The City shall review the SWPPP within 14 days of receipt of the plan. If revisions are required, the Contractor shall revise and re-submit the document within seven (7) days of its receipt of the City’s comments. The City shall then have seven (7) days to consider the revisions made by the Contractor and approve the SWPPP.

The Contractor shall maintain a minimum of two (2) readily accessible copies of the SWPPP at the Project site. The SWPPP shall be made available upon request of a representative of the Los Angeles Regional Water Quality Control Board (LARWQCB) or the U.S. Environmental Protection

Page 26 of 133 ends

Agency (U.S. EPA). Requests by environmental groups and the public shall be directed to the City.

D. Best Management Practices
The objective of the SWPPP is to identify potential sources of pollution that may reasonably affect the quality of storm water discharge associated with construction activities. The plan will describe and ensure the implementation of Best Management Practices (BMPs) which will be used to reduce pollutants in the storm water discharges from the construction site. A Best Management Practice is defined as any program, technology, process, operating method, measure, or device that controls, prevents, removes, or reduces pollution. The Contractor shall select appropriate BMPs from the California Stormwater BMP Handbook, Municipal, Industrial, New Development, and Construction Volumes (www.cabmphandbooks.com) in conjunction with all activities and construction operations. Copies of the California Stormwater BMP Handbooks may be obtained from:

California Stormwater Quality Association
P.O. Box 2313
Livermore, CA 94551
www.cabmphandbooks.com
Cashier
Los Angeles County DPW
900 South Fremont Avenue
Alhambra, CA 91803
Tel. No. (626) 458-6959
E. Implementation
The Contractor will be responsible throughout the duration of the Project for the installation, monitoring, inspection and maintenance of the BMPs included in the SWPPP and for removing and disposing of temporary BMPs. The Contractor may be required to implement additional BMPs as a result of changes in actual field conditions, contractor’s activities, or construction operations.

The Contractor shall demonstrate the ability and preparedness to fully deploy these SWPPP control measures to protect soil-disturbed areas of the project site before the onset of precipitation and shall maintain a detailed plan for the mobilization of sufficient labor and equipment to fully deploy these control measures.

Throughout the winter season, active soil-disturbed areas of the project site shall be fully protected at the end of each day with these control measures unless fair weather is predicted through the following day. The Contractor shall monitor daily weather forecasts. If precipitation is predicted prior to the end of the following workday, construction scheduling shall be modified, as required, and the Contractor shall deploy functioning control measures prior to the onset of the precipitation.

The City may order the suspension of construction operations which are creating water pollution if the Contractor fails to conform to the requirements of this Paragraph 2.17. Unless otherwise directed by the City, the Contractor’s responsibility for SWPPP implementation shall continue throughout any temporary suspension of the Work.

F. Sewage Spill Prevention. The Contractor’s attention is directed to the sewer bypass operation required during any sewer construction pursuant to the 2012 edition of the “Greenbook” Standard Specifications for Public Works Construction, Section 500.1.2.4 or as that section is subsequently amended.

The Contractor shall exercise extraordinary care to prevent the cause of events that may lead to a sewage spill. In the event of a sewage spill, the Contractor shall make arrangements for an emergency response unit comprised of emergency response equipment and trained personnel to be immediately dispatched to the project site.

Page 27 of 133 ends

The Contractor shall be fully responsible for preventing and containing sewage spills as well as recovering and properly disposing of raw sewage. In addition, the Contractor is responsible for any fines, penalties and liabilities arising from negligently causing a sewage spill. Any utility that is damaged by the contractor shall be immediately repaired at the Contractor’s expense. The Contractor shall take all measures necessary to prevent further damage or service interruption and to contain and clean up the sewage spills.

G. Sewage Spill Telephone Notification
Should a sewage spill occur, the Contractor shall immediately report the incident to both of these two City Departments:

Sewer Maintenance Services ............... City of Vernon Control Center (323) 826-1461 Fire Department Dispatch Center ................................................................................. 911 The Contractor is encouraged to obtain telephone numbers, pager numbers and cellular telephone numbers of City representatives such as Project Managers and Inspectors. However, if these City representatives are not available, then the Contractor shall immediately call:

City if Vernon Control Center
(323) 826-1461
H. Sewage Spill Written Notification
The Contractor shall prepare and submit a written report to the Director within three (3) Working Days from the occurrence of a spill to the City. This report shall describe all of the following:

1. The exact location on the Thomas Guide map.

2. The nature and volume.

3. The date, time and duration.

4. The cause.

5. The type of remedial and/or cleanup measures taken and date and time implemented.

6. The corrective and preventive action taken.

7. The water body impacted and results of necessary monitoring.

I. Enforcement
The City is subject to enforcement actions by the LARWQCB, U.S. EPA, environmental groups and private citizens. The Contractor shall indemnify, defend and hold City, its officers, agents and employees harmless from Contractor’s failure to comply and/or fulfill the requirements set forth in this Paragraph 2.17. Contractor shall be responsible for all costs and liabilities imposed by law as result of Contractor’s failure to comply and/or fulfill the requirements set forth in this Paragraph 2.17.

The costs and liabilities include, but are not limited to fines, penalties and damages whether assessed against the City or the Contractor.

In addition to any remedy authorized by law, any money due to the Contractor under this contract shall be retained by the City until all costs and liabilities imposed by law against the City or Contractor have been satisfied.

Page 28 of 133 ends

J. Maintenance
The Contractor shall ensure the proper implementation and functioning of BMP control measures and shall regularly inspect and maintain the construction site for the BMPs identified in the SWPPP. The Contractor shall identify corrective actions and time frames in order to properly address any damaged measure, or reinitiate any BMPs that have been discontinued.

If the City identifies a deficiency in the deployment or functioning of identified control measures, the deficiency shall be corrected by the Contractor immediately or by a later date and time if agreed to by Director and if requested in writing, but not later than the onset of the subsequent precipitation events. The correction of deficiencies shall be at no additional cost to the City.

K. Payment
All costs involved in the implementation of the SWPPP, including furnishing all labor, materials, tools, equipment and all incidentals; and for doing all the work involved in installing, constructing, maintaining, removing, and disposing of control measures, except those that were installed as a part of another structure, shall be included in the unit prices bid for the various related items of work and no additional compensation will be made therefor.

2.18 SOLID WASTE DISPOSAL AND DIVERSION
The Contractor shall submit to the Director the following summary of solid waste generated by the Work, disposed in Class III landfills, or diverted from disposal through recycling. Report disposal in inert fill separately. This form must be accompanied by legible copies of weight tickets, receipts, or invoices that specifically identify the project generating the material. Said documents must be from recyclers and/or disposal site operators that are acceptable to the Director. Further, the documents must be submitted to the Director with each application for progress payment. Failure to submit the form and its supporting documentation will render the application for progress payment incomplete and delay progress payments.

Page 29 of 133 ends

SUMMARY OF SOLID WASTE DISPOSAL AND DIVERSION
Project Title: ______________________________ Specification No. ___________ Type of Material (a) Disposed in
Class III Landfills
(b) Diverted from
Class III Landfills by
(c) [Leave This
Column Blank]
(d) Disposed in Inert
Fills
Tons/CY Tons/CY Tons/CY Tons/CY
Asphalt
Concrete
Metal
Other Segregated
Materials (Describe):

Miscellaneous
Construction Waste
Total
Form to be submitted to the City
SIGNATURE:

TITLE:

DATE:

2.19 RECYCLED, REUSABLE AND RECYCLABLE PRODUCTS
The Contractor is encouraged to propose recycled, reusable and recyclable products for use by the City.

Those items should be clearly identified. The City may require further information or documentation to ascertain the suitability/appropriateness of a proposed product. [END OF ARTICLE]

Page 30 of 133 ends

ARTICLE 3 - TIME OF COMMENCEMENT AND COMPLETION

3.01 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
A. Notice to Proceed
The Contractor is not authorized to perform any Work the Contract Documents until he/she has received from the City an official notification to commence Work. The date on which the notification is received by the Contractor is herein referred to as the Notice to Proceed. The Contractor shall commence Work on the Date of Commencement established in the Notice to Proceed is issued. The Notice to Proceed shall be issued after the Contract is properly executed, bonds are furnished and approved, and insurance has been submitted and approved.

B. Prosecution of the Work
Work shall be continued at all times with such force and equipment as will be sufficient to complete it within the specified time. The Contractor expressly proposes that he/she has taken into consideration and made allowances for all ordinary delays and hindrances to the Work to be performed and that he/she will complete the Work within the specified time.

C. Required Contract Completion
Time is of the essence in the completion of this Contract. The Work shall be completed in its entirety and made ready for service within sixty (60) calendar days following the Date of Commencement established in the Notice to Proceed (“Contract Time”). By executing the Contract, Contractor confirms that the Contract Time is a reasonable period for performing the Work.

3.02 CITY'S DISCRETION TO EXTEND CONTRACT TIME
In the event the Work required hereunder is not satisfactorily completed in all parts and in compliance with the Contract Documents, City shall have the right, in its sole discretion, to increase the number of Working Days or not, as may seem best to serve the interest of City. A change order extending the Contract Time only will be issued by the City should the City decide to increase the number of Working Days.

3.03 SUBSTANTIAL COMPLETION
A. Contractor Request for Inspection and Punch List
When the Contractor considers that it has achieved Substantial Completion of the Work, or designated portion thereof, Contractor shall prepare and submit to the Director a request for inspection and a comprehensive punch list of items to be completed or corrected prior to Final Payment. Failure to include an item on such punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

B. City Inspection
Upon receipt of the Contractor's punch list, the Director will make an inspection to determine whether the Work or designated portion thereof is Substantially Complete. If the inspection discloses any item, whether or not included on the Contractor's punch list, which is not sufficiently complete in accordance with the Contract Documents so that the City can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before City's issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by City.

Page 31 of 133 ends

The Contractor shall then submit a request for another inspection by City to determine Substantial Completion.

C. Certificate of Substantial Completion
When the Work or designated portion thereof is substantially complete, the Director will prepare a Certificate of Substantial Completion which shall establish the date of Substantial Completion, shall establish responsibilities of the City and Contractor for security, maintenance, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall finish all items on the Contractor’s punch list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work. Contractor shall deliver to City all warranty and guarantee documents and policies.

3.04 DELAYS AND EXTENSIONS OF TIME FOR CONTRACTOR
A. The Contractor shall take reasonable precautions to foresee and prevent delays to the Work. In the event of any delay to the Work, the Contractor shall revise his/her sequence of operations, to the extent possible under the terms of the Contract, to offset the delay.

B. If any delay to the Work is caused by circumstances within the Contractor's control, it is not excusable and not compensable, and the Contractor will not be entitled to any extension of time or to any other compensation for damages resulting directly or indirectly therefrom.

C. If any delay having a direct effect on the Work is caused by circumstances beyond the control of the Contractor except for causes of delay specified in Paragraph 3.04-D., such delay may be excusable and may entitle the Contractor to an equivalent extension of time, but not to any other compensation.

Excusable but not compensable causes include but are not limited to labor disputes, weather conditions unfavorable for prosecution of the Work, and force majeure.

D. If any delay having a direct effect on the Work is caused by failure of the City to provide information as specified, or necessary instructions for carrying on the Work, or to provide the necessary right of way or site for installation, or failure of a utility to remove or relocate an existing facility such delay may be compensable and may entitle the Contractor to an equivalent extension of time, and to compensation for damages resulting directly from any of the causes of delay specified in this paragraph.

E. The Contractor shall notify the Director in writing of any delay having a direct effect on the Work and the causes thereof within 15 days from the beginning of such delay.

F. Any claim for an extension of time or for compensation for damages resulting from delay shall be made in writing to the Director not more than 30 days after the ending of such delay. The Contractor shall provide a written report evaluating the impact of the delay which shall include, at a minimum, all of the following:

1. a narrative description of the delay and its impact on the critical path to Substantial Completion of the Work or a portion of the Work designated by City;

2. a detailed breakdown of the Allowable Costs, if any, sought by Contractor due to the delay;

3. the number of days of extension sought by Contractor as an adjustment to the Contract time;

4. a statement that Contractor has complied with the requirements of the General Conditions for written notice of delays, along with the dates and copies of such notices;

5. the measures taken by Contractor and Subcontractors to prevent or minimize the delay; and

Page 32 of 133 ends

6. the Contactor’s recommendations for reordering or re-sequencing the Work to avoid or minimize further delay.

No extension of time or compensation for damages resulting from delay will be granted unless the delay affects the timely completion of the overall Work under the Contract or the timely completion of a portion of the Work for which a time of completion is specified.

G. The Director will investigate the facts and ascertain the extent of the delay, and his/her findings thereon shall be final and conclusive.

H. Failure of the Contractor to give written notice of a delay, or to submit or document a claim for an extension of time or for damages resulting from delay in the manner and within the times stated above shall constitute a waiver of all claims thereto.

I. When a Contractor experiences two concurrent delays, one compensable and the other excusable, no compensation other than an extension of time will be allowed.

J. An extension of time must be approved by the Director to be effective, but an extension of time whether with or without consent of the sureties, shall not release the sureties from their obligations, which shall remain in full force until the discharge of the Contract.

3.05 CLIMATIC CONDITIONS
A. The Director may suspend the Work whenever weather conditions or conditions resulting from inclement weather are unfavorable for the prosecution of the Work. The delay caused by such suspension may entitle the Contractor to an extension of time but not to any other compensation.

B. If the Contractor believes that Work should be suspended under this Paragraph 3.05, he/she may request such suspension. The delay caused by such suspension may entitle the Contractor to an extension of time but not to any other compensation.

C. No extension of time will be granted for suspension of Work unless the suspension affects the timely completion of all Work under the Contract or the timely completion of a portion of the Work for which a time of completion is specified. Determination that the suspension for inclement weather conditions or conditions resulting from inclement weather affects timely completion and entitles the Contractor to an extension of time shall be made and agreed to in writing by the Director and the Contractor on each day that Work is suspended. In the event of failure to agree, the Contractor may protest under the provisions of Paragraph 7.07.

D. If Work is suspended and an extension of time is granted under this Paragraph 3.05 the Contractor will be entitled to a one day extension of time for each day that he/she is unable to Work at least one-half of his/her current normal Work day; and if the Work is suspended at the regular starting time on any Work day and the Contractor's Workforce is dismissed as a result thereof, then he/she will be entitled to a one day extension of time whether or not conditions change thereafter and the major portion of the day is suitable for Work.

3.06 COMPLETION AND ACCEPTANCE
A. Upon request by the Contractor, the Director shall conduct a final inspection of the Work. If, in the Director’s opinion, Final Completion has been achieved, the Director will accept the Work by issuing a “Notice of Completion” of the Work to the Contractor. Upon the issuance of the Notice of Completion the Contractor will be relieved from responsibility to protect the Work.

B. Within 15 calendar days after issuing the Notice of Completion, the Director will record the Notice of Completion with the County Recorder.

Page 33 of 133 ends

3.07 LIQUIDATED DAMAGES
A. Contractor and City agree to liquidate damages in the amount of two hundred and fifty dollars ($250) per day, with respect to Contractor’s failure to achieve Substantial Completion of the Work within the Contract Time. The Parties intend for the liquidated damages set forth herein to apply to this Contract as set forth in Government Code Section 53069.85. The Contractor acknowledges and agrees that the liquidated damages are intended to compensate City solely for the Contractor’s failure to meet the deadline for Substantial Completion and shall not excuse Contractor from liability from any other breach, including any failure of the Work to conform to the requirements of the Contract Documents.

B. In the event that Contractor fails to achieve Substantial Completion of the Work within the Contract Time, Contractor agrees to pay City the amount specified in the Contract form for each calendar day that Substantial Completion is delayed.

C. Contractor and City acknowledge and agree that the foregoing liquidated damages have been set based on an evaluation of damages that the City will incur in the event of late completion of the Work.

Contractor and City acknowledge and agree that the amount of such damages are impossible to ascertain as of the effective date hereof and have agreed to such liquidated damages to fix City’s damages and to avoid later disputes. It is understood and agreed by Contractor that liquidated damages payable pursuant to this Agreement are not a penalty and that such amount are not manifestly unreasonable under the circumstances existing as of the effective date of this Agreement.

D. It is further mutually agreed that City shall have the right to deduct liquidated damages against progress payments or retainage and that the City will issue a Construction Change Directive and reduce the Contract Sum accordingly. In the event the remaining unpaid Contract Sum is insufficient to cover the full amount of liquidated damages. Contractor shall pay the difference to City. [END OF ARTICLE]

Page 34 of 133 ends

ARTICLE 4 - CONSTRUCTION SCHEDULES

4.01 BASELINE PROJECT SCHEDULE
The Contractor shall submit his/her work Baseline Project Schedule, in electronic as well as hard-copy format, to the Director at the pre-construction meeting showing in detail how the Contractor plans to execute and coordinate the Work. The construction schedule shall show the sequence of work, critical path and estimated time for completion of each segment of work. This schedule must be reviewed and accepted by the Director before the Contractor will be permitted to begin work. In addition, the Contractor shall submit a detailed schedule forecasting two (2) weeks of work describing each day’s work. This schedule shall be updated and submitted to the City every other Monday during the construction period. The Contractor shall give 48 hours notice to the City Engineer prior to the start of the work.

A. Format

1. At a minimum, the Baseline Project Schedule activities shall be coded on a work discipline basis and by geographic area or location on the Project. The Baseline Project Schedule shall include a detailed description of each activity code. The Baseline Project Schedule shall be based on and incorporate contract milestone and completion dates specified in the Contract Documents. It shall depict events, jobs, and their interrelationships and shall recognize the progress that must be made on one task before subsequent tasks can begin. The schedule shall be comprehensive and shall include all logical interdependencies and interactions required to perform the Work of the Project.

2. Overall time of completion and time of completion for each milestone shown on the Schedule shall adhere to the specified Contract Time, unless an earlier (advanced) time of completion is requested by Contractor, agreed to by the City and formalized by Change Order.

3. Contractor shall use the latest version of Microsoft Project or equivalent software agreed to by the parties.

4. The City will review the submitted Baseline Project Schedule for conformance with these scheduling requirements. Within fourteen (14) calendar days after receipt, the City will accept the proposed Baseline Project Schedule or will return it with comments. If the proposed Baseline Project Schedule is accepted by the City, it shall be deemed part of the Contract Documents. If the Baseline Project Schedule is not accepted by City, Contractor shall revise the Baseline Project Schedule, in accordance with the recommendations of the City, and re-submit same for acceptance, no later than seven (7) calendar days after receipt of said recommendation.

5. Acceptance of Baseline Project Schedule by City, failure to include an element of work, or inaccuracy in Baseline Project Schedule shall not relieve Contractor from the responsibility for accomplishing the Work in accordance with the Contract Documents.

B. Float

1. Critical Work activities are defined as Work activities which, if delayed or extended, will delay the scheduled completion of the milestones and/or time of completion. All other Work activities are defined as non-critical Work activities and are considered to have float. Float is defined as the time that a non-critical Work activity can be delayed or extended without delaying the scheduled completion of the milestones and/or time of completion. Float is considered a Project resource available to either party or both parties as needed. Once identified, Contractor shall monitor, account for, and maintain float in accordance with Critical Path Methodology.

Page 35 of 133 ends

2. Delays of any non-critical Work shall not be the basis for an extension of Contract Time until the delays consume all float associated with that non-critical Work activity and cause the Work activity to become critical.

3. It is acknowledged that City-caused time savings (i.e., critical path submittal reviews returned in less time than allowed by the Contract Documents, approval of substitution requests which result in a savings of time for Contractor, etc.) create shared float. Accordingly, City-caused delays may be offset by City-caused time savings.

C. Weather (This section applies only to projects of one (1) year duration or longer) The completion time contemplated by this Contract anticipates zero lost days (Work Days) due to normal weather conditions annually and prorated for any duration less than twelve months. Only unusual or extreme weather conditions, as determined by the National Oceanic and Atmospheric Administration, for the time of year will be considered as justification for an extension of time to complete the Project, and only after the zero weather days have been utilized. Annual weather days are not cumulative, and unused days shall become “float” for the benefit of the project, and the schedule adjusted accordingly. The use of weather days by the Contractor shall be subject to all the conditions of claim for an extension of time. The Contractor shall notify the City in writing within ten (10) days of the commencement of each rain event.

D. Early Completion
While the Contractor may schedule completion of the Project earlier than the date established by the Contract Documents, no additional compensation shall become due the Contractor for the use of float time between the Contractor’s projected early completion date and the date for Substantial Completion established by the Contract Documents, unless an earlier (advanced) time of completion is requested by Contractor, agreed to by the City, and formalized by Change Order.

4.02 SCHEDULE UPDATES
A. With each Application for Payment submitted by Contractor (other than the final Application for Payment), the Contractor shall submit to the City an updated Project Schedule revised to indicate the Work completed, status of Work in progress, all progress slippages, corrective actions taken, or slippage carry-over, for all anticipated delays or difficulties, and all other information required to accurately present the actual status of the progress of the Work as of the date of the Application for Payment. If the Contractor does not submit an updated Project Schedule with an Application for Payment, City may withhold payment, in whole or in part, until the updated Project Schedule is submitted. In the event that an update to the Project Schedule indicates a delay to the Contract Time the Contractor shall propose an affirmative plan to correct each such delay, including overtime and/or additional labor, if necessary. In no event shall any Project Schedule update constitute an adjustment in the Contract Time, any deadline, or the Contract Sum unless any such adjustment is agreed to by the City and authorized pursuant to Change Order or Work Directive.

B. At no time shall historical data contained within the updated Project Schedule (i.e. completed activities) be removed and/or altered in any way. This historical data is to be preserved within each of the updated Project Schedules and submitted with the final schedule update to reflect the actual start and finish dates for each activity within the Schedule.

C. Any work stoppages within individual work activities that exceed seven (7) calendar days in duration shall be clearly indicated within the updated Project Schedule. In cases where unplanned activity work

Page 36 of 133 ends

stoppages exceed seven (7) calendar days activities shall be added to the Project Schedule to clearly indicate the work stoppage period and identify forecasted resumption and completion of the activity where work has stopped. Contractor shall clearly note all schedule revisions when Project Schedule updates are submitted, as required in this Paragraph 4.02 above.

4.03 NONCOMPENSABLE EXTRAORDINARY MEASURES
A. Should the City determine, in its sole judgment, that the performance of the Work has not progressed to the level of completion required by the Contract Documents, City shall have the right to order the Contractor to take corrective measures to expedite the progress of construction, at no additional cost to the City, including, without limitation, the following:

1. Working additional shifts of overtime.

2. Supplying additional manpower, equipment, and/or facilities.

3. Reschedule activities to maximize practical concurrence of accomplishment of activities.

4. Submitting a Recovery Schedule discussed above, for resequencing performance of the Work or other similar measures.

5. Any other actions that may be necessary to mitigate delays.

B. Such Extraordinary Measures shall continue until the progress of the Work is no longer behind schedule and/or reaches the stage of completion required by the Contract Documents. Contractor shall not be entitled to an adjustment in the Contract Sum in connection with the performance of any such Extraordinary Measures required by the City under this Paragraph. The City may exercise the rights furnished the City pursuant to this Paragraph as frequently as the City deems necessary to ensure that the Contractor’s performance of the Work will comply with the Contract Time or interim completion dates set forth in the Contract Documents. If Contractor or its Subcontractors fail to implement or commence Extraordinary Measures within ten (10) calendar days of City’s written demand, City may, without prejudice to other remedies, take corrective action at the expense of the Contractor which shall reduce the Contract Sum accordingly.

4.04 CONDITION OF PAYMENT
Compliance by Contractor with the requirements of the Contract Documents pertaining to preparation, submission, revising and updating of the Schedule is a condition precedent to City’s obligation to make payment to Contractor of any or all sums that might otherwise be due to Contractor in the absence of such noncompliance.

Payment by City under circumstances in which City, for any reason, fails or elects not to assert its right to withhold payment for noncompliance with this Paragraph shall not be construed as a waiver of the right to withhold future payments on account of such noncompliance or any other noncompliance. [END OF ARTICLE]

Page 37 of 133 ends

ARTICLE 5 - SUSPENSION OR TERMINATION OF CONTRACT

5.01 TERMINATION BY THE CONTRACTOR
A. Contractor shall have the right to terminate its performance of the Contract only upon the occurrence of one of the following:

1. The Work is stopped for a period of ninety (90) consecutive days through no act or fault of the Contractor, any Subcontractor, Sub-subcontractor, their agents or employees, or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, due to:
a. the issuance of an order of a court or other public authority having jurisdiction; or b. an act of government, such as a declaration of national emergency making material unavailable;
and Contractor has given City written notice within ten (10) days of the occurrence of such ground for termination, then the Contractor may, upon thirty (30) additional calendar days written notice to City, unless the reason has theretofore been cured, terminate its performance of the Work.

2. The Work is stopped for a period of 120 consecutive days through no act or fault of Contractor, any Subcontractor, Sub-subcontractor, their agents or employees, or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, because the City has persistently failed to perform any material obligation under the Contract Documents and fails to cure such default within ninety (90) days after the receipt of notice from Contractor stating the nature of such default.

B. If Contractor terminates its performance of the Contract in accordance with this Paragraph 5.01, the City shall pay Contractor for the Work executed through the date of termination as set forth in Paragraph

5.04-C below.

5.02 TERMINATION BY THE CITY FOR CAUSE
A. Grounds
The City shall have the right to terminate the Contractor’s performance of the Contract, in whole or in part, without liability to City if:

1. Contractor fails promptly to begin the Work under the Contract Documents; or

2. Contractor refuses or fails to supply enough properly skilled workers or proper materials; or

3. Contractor fails to perform the Work in accordance with the Contract Documents, including conforming to applicable standards set forth therein in constructing the Project, or refuses to remove and replace rejected materials or unacceptable Work; or

4. Contractor discontinues the prosecution of the Work (exclusive of work stoppage: (a) due to termination by City; or (b) due to and during the continuance of a Force Majeure event or suspension by City); or

Page 38 of 133 ends

5. Contractor fails to resume performance of Work which has been suspended or stopped, within a reasonable time after receipt of notice from City to do so or (if applicable) after cessation of the event preventing performance; or

6. Any representation or warranty made by Contractor in the Contract Documents or any certificate, schedule, instrument, or other document delivered by Contractor pursuant to the Contract Documents shall have been false or materially misleading when made; or

7. Contractor fails to make payment to Subcontractors or Material Suppliers for materials or labor in accordance with the respective Contract Documents and applicable law; or

8. Contractor disregards laws, ordinances, or rules, regulations, or orders of a public authority having jurisdiction; or

9. Contractor is guilty of breach of a provision of the Contract Documents; or

10. Contractor becomes insolvent, is adjudicated bankrupt, or makes a general assignment for the benefit of creditors and fails to provide City with adequate assurances of Contractor’s ability to satisfy its contractual obligations.

A receiver, trustee, or other judicial officer shall not have any right, title, or interest in or to the Contract.

Upon that person’s appointment, City has, at its option and sole discretion, the right to immediately cancel the Contract and declare it null and void.

B. City’s Rights.

When any of the reasons specified in Paragraph 5.02-A exist, the City may, in addition to and without prejudice to any other rights or remedies of the City, and after giving the Contractor five (5) calendar days written notice, terminate Contractor’s performance of the Work, in whole or in part, and may:

1. Take possession of the site and all materials, equipment, tools, construction equipment, and machinery thereon owned by the Contractor;

2. Withhold from Contractor amounts unpaid hereunder and to offset such amounts against damages or losses incurred by City;

3. Accept assignment of subcontracts from Contractor, at the sole discretion of City, and

4. Finish the Work by whatever reasonable method the City may deem expedient.

Upon request of the Contractor, the City shall furnish to the Contractor a detailed accounting of the costs incurred by the City in finishing the Work.

C. Costs
If City’s costs to complete and damages incurred due to Contractor’s default exceed the unpaid Contract balance, the Contractor shall pay the difference to the City.

D. Wrongful Termination
If it has been adjudicated or otherwise determined that City has wrongfully terminated the Contractor

Page 39 of 133 ends

for cause, then said termination shall be deemed converted to a termination for convenience as set forth in Paragraph 5.04 and Contractor’s remedy for wrongful termination in such event shall be limited to the recovery of the payments permitted for termination for convenience as set forth in Paragraph

5.04. 5.03 PARTIAL DELETION OR SUSPENSION OF WORK BY THE CITY A. Contractor agrees that the City may determine whether any or all of the Work described in the Contract Documents shall be deleted or performance suspended without electing to terminate the Contractor’s performance under the Contract and without any penalty being incurred by the City.

B. Any such partial deletion or suspension of the Work shall in no way void or invalidate the Contract nor shall it provide Contractor with any basis for seeking payment from City for Work deleted or suspended except to the extent such Work has already been performed and is otherwise compensable under the Contract.

C. The City shall have the right to later have any such suspended or deleted Work performed by Contractor or others without any penalty to the City.

D. In the event of any partial or complete deletion or suspension of Work, the City shall furnish Contractor with prompt written notice thereof, and the City shall be entitled to take possession of and have as its property all Record Documents, Accounting Records, and other data prepared by Contractor or its Subcontractors.

E. Suspension for Convenience.

1. The City may at any time and from time to time, without cause, order the Contractor, in writing, to suspend, delay, or interrupt the Work in whole or in part for such period of time as the City may determine. Such order shall be specifically identified as a “Work Suspension Directive” under this Section.

2. Upon receipt of a Work Suspension Directive, Contractor shall, at the City’s expense, comply with its terms and take all reasonable steps to minimize costs allocable to the Work covered by the Work Suspension Directive during the period of Work stoppage.

3. Within the period of suspension, or such extension to that period as is agreed upon by Contractor and the City, the City shall either cancel the Work Suspension Directive or delete the Work covered by such Work Suspension Directive by issuing a Change Order or Construction Change Directive.

4. If a Work Suspension Directive is cancelled or expires, Contractor shall continue the Work. A Change Order or Construction Change Directive will be issued to cover any adjustments of the Contract Sum and Contract Time necessarily caused by such suspension. No adjustment shall be made to the extent:
(a) That performance is, was, or would have been so suspended, delayed, or interrupted by another cause for which the Contractor is responsible; or (b) That an equitable adjustment is made or denied under another provision of the Contract.

F. Suspensions for Cause
City has the authority by written order to suspend the Work, in whole or in part, without liability to City

Page 40 of 133 ends

for Contractor’s failure to:

1. Correct conditions unsafe for the Project personnel or general public, or

2. Carry out the Contract; or

3. Carry out orders of City.

G. Responsibilities of Contractor During Suspension Periods During periods that Work is suspended, Contractor shall continue to be responsible for the Work and shall prevent damage or injury to the Project, provide for drainage, and shall erect necessary temporary structures, signs or other facilities required to maintain the Project and continue to perform according to the Contract Documents.

5.04 TERMINATION BY THE CITY FOR CONVENIENCE
A. Grounds
Without limiting any rights which City may have by reason of any default by Contractor hereunder, City may terminate Contractor’s performance of the Contract, in whole or in part, at any time, for convenience upon fifteen (15) calendar days written notice to Contractor.

B. Contractor Actions
Upon receipt of such notice, Contractor shall perform the duties required by Paragraph 5.05 below.

At the election of and as directed by the City, any or all of the subcontracts and purchase orders entered in to by Contractor prior to the effective date of termination shall be terminated or shall be assigned to City.

C. Compensation

1. If the Parties are unable to agree on the amount of a termination settlement, the City shall pay the Contractor the following amounts:
a. For Work performed before the effective date of termination, the total (without duplication of any items) of:
i. The cost of the Work; and
ii. A sum, as overhead and profit on the cost of the Work, determined by the City to be fair and reasonable. In no event shall Contractor be entitled to recover overhead or profit on Work not performed.
b. The reasonable costs of settlement of the Work terminated, including:
i. Accounting, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data, if any; and ii. Storage, transportation, and other costs reasonably necessary for the preservation, protection, or disposition of inventory.

Page 41 of 133 ends

2. Such payment shall be Contractor’s exclusive remedy for termination for convenience and will be due and payable on the same conditions as set forth for final payment to the extent applicable.

Upon receipt of such payment, the Contractor and City shall have no further obligations to each other except for Contractor’s obligations with respect to warranties, representations, indemnity, maintenance of insurance, and other obligations that survive termination or Final Completion as provided for herein.

3. It is understood and agreed that no fee, anticipated profit, compensation for lost opportunity costs, or other compensation or payment of any kind or character shall be due or payable for unperformed Work regardless of the basis of termination and the inclusion of this provision within this subparagraph shall in no way limit its application to termination under this Paragraph.

4. Contractor agrees that each of its subcontracts will reserve for the Contractor the same right of termination for convenience provided by this Paragraph 5.04.

D. No Consequential Damages
Under no circumstances shall Contractor be entitled to anticipatory or unearned profits or consequential or other damages as a result of a termination or partial termination under this Article 5. The payment to Contractor determined in accordance with this Article constitutes Contractor’s exclusive remedy for a termination hereunder.

5.05 CONTRACTOR’S DUTIES UPON TERMINATION FOR CAUSE OR CONVENIENCE If the City terminates Contractor’s performance of Work under the Contract, for cause or convenience or if Contractor terminates a Subcontractor with the City’s approval, Contractor shall:
(1) cease performance of the Work to the extent specified in the notice; (2) take actions necessary or that the City may direct, for the protection and preservation of the Work; (3) settle outstanding liabilities, as directed by City; (4) transfer title and deliver to City Work in progress, specialized equipment necessary to perform the Work; (5) submit all Record Documents, Accounting Records and other data prepared pursuant to the Contract by Contractor and/or its Subcontractors, as applicable, to the City with fifteen (15) calendar days after the City’s notice of termination in an organized, usable form, in both hard copy and electronic/digital form, with all items properly labeled to the degree of detail specified by the City; and, (6) except for Work directed by City to be performed prior to the effective date of termination stated in the notice, incur no further costs or expenses and enter into no further subcontracts and purchase orders.

No compensation shall be due Contractor, if any, until Contractor complies with the requirements of this Paragraph.
[END OF ARTICLE]

Page 42 of 133 ends

ARTICLE 6 – CHANGES

6.01 CITY'S RIGHT TO ORDER CHANGES
The City, without invalidating the Contract, may authorize changes in the Work consisting of additions, deletions, or other revisions, with the Contract Sum and Contract Time being adjusted accordingly, if necessary. All such changes in the Work shall be authorized by Change Order or Construction Change Directive and Contractor shall perform such changes in the Work according to the applicable requirements of the Contract Documents.

6.02 APPLICABLE PROVISIONS
Changes in the Work shall be performed under applicable provisions of the Contract Documents. The Contractor shall proceed promptly and diligently with the change, unless otherwise provided in the Change Order or Construction Change Directive. It is of the essence to this Contract that all scope changes in the Work that form the basis of an adjustment of the Contract Sum or Contract Time must be authorized in advance in writing through either a Change Order or Construction Change Directive. A change in the Contract Sum or the Contract Time shall be accomplished only by Change Order or Construction Change Directive.

Accordingly, no verbal directions, course of conduct or dealings between the Parties, express or implied acceptance of alterations or additions to the Work, or claim that the Contract has been abandoned or the City has been unjustly enriched by any alteration or addition to the Work shall be the basis of any claim for an increase in any amounts due under the Contract Documents or a change in any time period provided in the Contract Documents.

6.03 NOTICE OF SCOPE CHANGE
Contractor shall submit written notice of any change in scope to the Director if, in the Contractor’s opinion, any instruction, request, Drawings, Specifications, action, condition, omission, default, or other situation occurs that the Contractor believes constitutes a scope change or other matter resulting in Extra Work, for which Contractor believes it is entitled to an adjustment of the Contract Sum or Contract Time. Such notice shall be provided prior to performance of the Work affected by such occurrence and within seven (7) calendar days after the discovery date of the circumstances of such scope change or other matters. The written notice shall state the date, circumstances, extent of adjustment to the Contact Sum or the Contract Time, if any, requested. The mere presentation of such notice shall not establish the existence of any right by Contractor to adjustment of the Contract Sum or Contract Time. Failure to provide such timely written notice described herein shall constitute a waiver by Contractor of the right to any adjustment to the Contract Sum or Contract Time on account thereof.

6.04 CHANGE ORDERS
A. Computation
Methods used in determining adjustments to the Contract Sum by Change Order may include those listed in Paragraph 6.06 below.

B. Accord and Satisfaction
Agreement on any Change Order shall be a full compromise and settlement of all adjustments to Contract Time and Contract Sum, and compensation for any and all delay, extended or additional field and home office overhead, disruption, acceleration, inefficiencies, lost labor or equipment productivity, differing Site conditions, construction interferences and other extraordinary or

Page 43 of 133 ends

consequential damages (hereinafter called "Impacts"), including any ripple or cumulative effects of said Impacts on the overall Work under the Contract arising directly or indirectly from the performance of Work described in the Change Order. By execution of any Change Order, Contractor agrees that the Change Order constitutes a complete accord and satisfaction with respect to all claims for schedule extension, Impacts, or any costs of whatever nature, character or kind arising out of or incidental to the Change Order. No action, conduct, omission, product failure or course of dealing by the City shall act to waive, modify, change, or alter the requirement that (i) Change Order's must be in writing, signed by the City and Contractor and; (ii) that such written Change Orders are the exclusive method for effectuating any change to the Contract Sum and/or Contract Time.

6.05 CONSTRUCTION CHANGE DIRECTIVE (FIELD DIRECTIVE)
A. A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order. The City may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletion, or other revisions, the Contract Sum and Contract Time being adjusted accordingly.

B. If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be calculated in accordance with Paragraph 6.06 herein (Pricing Changes in the Work).

C. Upon receipt of the Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved and advise the City of the Contractor’s agreement or disagreement with the method, if any, provided in the Construction Change Directive, for determining the proposed adjustment in the Contract Sum or Contract Time.

D. If Contractor believes a Construction Change Directive constitutes a basis for adjustment to the Contract Sum or Contract Time, then Contractor shall give a Notice of Scope Change provided in Paragraph 6.03, followed by a submission of a Change Order Request as required by Paragraph

6.08. Contractor shall, if requested by City in such Construction Change Directive or in a subsequent Construction Change Directive, proceed with the performance of the Work as described in the Construction Change Directive. Failure of Contractor to proceed with the performance of Work, as described in the Construction Change Directive shall give the City the right to carry out the Work, as set forth in Paragraph 2.05.

E. A Construction Change Directive signed by the Contractor indicates the Contractor’s agreement therewith, including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effective immediately and shall be recorded as a Change Order.

F. If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum, the method and the adjustment shall be determined by the City on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, including, in the case of an increase in the Contract Sum, Allowable Mark-Ups in accordance with Paragraph 6.06(E) herein.

6.06 PRICING CHANGES IN THE WORK
A. Alternative Methods of Pricing
The amount of any adjustment by Change Order or Construction Change Directive increasing or decreasing the Contract Sum shall be determined by the Director using one or a combination of the following methods:

Page 44 of 133 ends

1. Lump Sum. By mutual acceptance of a lump sum proposal from Contractor properly itemized and supported by sufficient substantiating data to permit evaluation. Such proposal shall be based solely on Allowable Costs, as defined in Subparagraph 6.06-C, and Allowable Mark-Ups, as defined in Subparagraph 6.06-E, and shall not include any costs or expense that is not permitted by the terms of any provision of the Contract Documents.

2. Unit Prices. By unit prices contained in Contractor’s original Bid and incorporated in the Contract Documents or fixed by subsequent agreement between City and Contractor. Unless otherwise stated in the Bidding Documents, unit prices stated in the Contract Documents or agreed upon by the County and Contractor shall be deemed to include and encompass all Allowable Markups.

3. Time and Materials. By calculating the actual Allowable Costs directly incurred, plus a sum for Allowable Mark-Ups on such Allowable Costs.

4. Deletion of Work. By Unit Prices contained in Contractor’s original Bid and incorporated in the Contract Documents, or by using the Schedule of Values to determine the value of the decrease of the Contract Sum, less the value of any Work performed, plus a reasonable percentage of the decrease for the Contractor’s saved overhead unless the Schedule of Values allocates general conditions costs to individual line items, in which case no percentage of the decrease shall be added. When a change consists of both addition and deletion of Work, the added costs and deleted costs shall be calculated separately, and then added together, resulting in the net cost for the change. The Allowable Mark-Up shall be applied to this net cost.

B. Contractor Maintenance of Daily Records for Changes

1. In the event that Contractor is directed to perform any Extra Work, or should Contractor encounter conditions which the Contractor believes would obligate the City to adjust the Contract Sum and/or the Contract Time, Contractor shall maintain detailed records of the cost of such changes on a daily basis summarized in a daily report supplemented by back-up records. Such records shall include without limitation:
a. Labor. At the close of each day on which such Extra Work is performed, Contractor shall submit an Extra Work labor report, on forms provided by Director, to Director that sets forth a list of the actual hours spent in performing the Extra Work, that clearly differentiates between the labor expended on the Extra Work and other Work, and the Allowable Costs for such Extra Work performed that day showing the names of workers, their classifications, hours worked and hourly rates. b. Materials, Equipment. A list of Allowable Costs of materials and equipment consumed in the performance of the Extra Work on the day on which such Extra Work is performed, together with copies of applicable delivery tickets and unit prices for all materials and for all equipment used the type of equipment, identification number, hours of operation (including loading and transportation) and hourly/daily rates involved for that day.
c. Other Services or Expenditures. A list of other services and expenditures constituting Allowable Costs incurred in performance of the Extra Work on the day on which such Extra Work is performed, along with documentation verifying the amounts thereof in such detail as Director may require.

Page 45 of 133 ends

2. In the event that more than one change to the Work is performed by the Contractor in a calendar day, Contractor shall maintain separate records of labor, construction equipment, materials, and equipment for each such change. In the event that any Subcontractor of any tier shall provide or perform any portion of any change to the Work, Contractor shall require that each such Subcontractor maintain records in accordance with this Section.

3. Each daily record maintained hereunder shall be signed by Contractor; such signature shall be deemed Contractor’s representation and warranty that all information contained therein is true, accurate, complete, and relates only to the change referenced therein. All records maintained by Subcontractors of any tier, relating to the costs of a change in the Work shall be signed by such Subcontractor’s authorized project manager or superintendent.

All such records shall be forwarded to the Director on the day the Work is performed (same day) for independent verification. The Director shall attempt to review and reconcile costs for changes on a daily basis. Records not available on the day on which the Extra Work is performed, such as, but not limited to, material invoices, shall be submitted as soon as they are available but not later than five (5) calendar days after the earlier of the day of delivery or incorporation of the particular item of Extra Work at the Site.

4. The Director may additionally require authentication of all time and material tickets and invoices by persons designated by the Director for such purpose. In the event that Contractor shall fail or refuse, for any reason, to maintain or make available for inspection, review, and/or reproduction such records, adjustments to the Contract Sum or Contract Time, if any, on account of any change to the Work may be deemed waived for that day. Contractor’s obligation to maintain back-up records hereunder is in addition to, and not in lieu of, any other Contractor obligation under the Contract Documents with respect to changes to the Work.

5. Waiver by Contractor. Failure to submit such records as are required by this Paragraph daily shall waive any rights for recovery of Allowable Costs incurred for Extra Work performed that day. The failure of the Contractor to secure any required authentication shall, if the City elects in its sole discretion to treat it as such, constitute a waiver by the Contractor of any right to adjustment of the Contract Sum for the Allowable Cost of all or that portion of the Extra Work covered by such non-authenticated ticket or invoice.

C. Allowable Costs
The term “Allowable Costs” shall mean in the case of Extra Work actual costs incurred by Contractor and/or any Subcontractor, regardless of tier, and necessarily involved in direct performance of the Extra Work, or in the case of deleted work the actual costs that would have been incurred in performing deleted work by Contractor and/or any Subcontractor, regardless of tier, and shall be limited to the following costs:

1. Labor. Straight-time wages or salaries, and overtime wages and salaries specifically authorized by City in writing, for employees employed at the site, or at fabrication sites off the site, in the direct performance of the Extra Work or that would have been incurred in the direct performance of the deleted work, based on the actual cost for wages prevailing locally for each craft or type of workers at the time the Extra Work is done or the deleted work is ordered eliminated. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. The use of labor classification which would increase the Allowable Cost for Extra Work will not be permitted unless Contractor establishes the necessity for such additional costs.

Page 46 of 133 ends

2. Benefits. Payroll taxes, insurance, health and welfare, pension, vacation, apprenticeship funds and benefits required by lawful collective bargaining agreements for employees on straight-time wages or salaries, and on overtime wages and salaries specifically authorized by City in writing, for employees employed at the site, or at fabrication sites off the site, in the direct performance of the Extra Work or that would have been incurred in the direct performance of the deleted work.

3. Materials, Consumables. Costs of materials and consumable items which are furnished and incorporated into the Work, as approved by City, or that would have been incorporated into the Work in the case of deleted work shall be at the lowest price available to Contractor but in no event shall such costs exceed competitive wholesale prices obtainable from other Subcontractors, suppliers, manufacturers and distributors in the general vicinity of the site. If City determines, in its discretion, that the cost of materials is excessive, or if Contractor fails to furnish satisfactory evidence of the cost from the actual supplier thereof, then in either case the cost of the materials shall be deemed to be the lowest wholesale price at which similar materials are available in the quantities required at the time they were needed. The City reserves the right to furnish such materials as it deems advisable, and Contractor shall have no claim for costs or profits on materials so furnished. Material invoices must be included with the extra work report to obtain payment.

4. Taxes. Sales taxes on the costs of materials and consumable items described in Paragraph

5.04-C.3 above.

5. Tool, Equipment Rental. Rental charges for necessary machinery and equipment, whether owned or hired, as authorized in writing by City, exclusive of hand tools, used directly in the performance of the Extra Work or that would have been used in the direct performance of the deleted work. Regardless of ownership, such rental charges shall not exceed the hourly rate derived from the most recently published “Rental Rate Blue Book for Construction Equipment” or the “Rental Rate Blue Book for Older Construction Equipment,” as published by K-111, San Jose, California, which is in effect at the time of commencement of the changed work. The Contractor shall attach a copy of the rate schedule to the daily reports required by Paragraph

6.06-B, above. The charges for any machinery and equipment shall cease when the use thereof is no longer necessary for the Extra Work or deleted work. No charge shall be allowed for use of equipment or tools which have a replacement value of $500 or less. The allowable rental rates shall include the cost of fuel, power oil, lubrication, supplies, small tools, necessary attachments, loading, transportation, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Notwithstanding the provisions of Paragraph 6.06-E below, no mark-up shall be allowed for overhead, profit or bond premiums for use of equipment if the equipment is supplied by an equipment rental firm. If equipment is used intermittently and, when not in use, could be returned to its rental source at less expense to City than holding it at the Site, it shall be returned, unless Contractor elects to keep it at the Site at no expense to City.

Costs incurred while equipment is inoperative due to breakdowns, regular maintenance, or for non-Working Days shall not be allowed. The rental time shall include the time required to move the equipment to the Work from the nearest available source for rental of such equipment and to return it to the source. If such equipment is not moved by its own power, then loading and transportation will be allowed. Neither moving time nor loading and transportation costs will be paid if the equipment is for use on the Project unrelated to the Extra Work. All equipment shall be acceptable to City, in good working condition, and suitable for the purpose for which it is to be used.

Page 47 of 133 ends

6. Royalties. Additional or saved costs of royalties due to the performance of the Extra Work or deleted work.

7. Insurance, Bonds. Additional or saved costs of insurance and bonds, provided, however, that for Extra Work such costs shall not exceed one percent (1%) of Items 1 through 6 above.

D. Costs Not Allowed
Allowable Costs shall not include any of the following:

1. Wages, salaries, fringe benefits and payroll taxes of Contractor’s and all Subcontractor’s noncraft labor (above a Foreman level);

2. Overhead (including home office overhead), administrative or general expenses of any kind including engineering, estimating, scheduling, drafting, detailing, etc., incurred in connection with Extra Work;

3. Vehicles not dedicated solely for the performance of the extra of deleted work;

4. Small tools (replacement value not exceeding $500);

5. Office expenses, including secretarial and administrative staff, materials and supplies;

6. On-site and off-site trailer and storage rental and expenses;

7. Site fencing;

8. Utilities, including gas, electric, sewer, water, telephone, telefax, copier equipment;

9. Computer and data processing personnel, equipment and software;

10. Federal, state of local business income and franchise taxes;

11. Losses of efficiency or productivity; and

12. Costs and expenses of any kind or item not specifically and expressly included in Paragraph

6.06-C.

E. Allowable Mark-Up

1. Extra Work by contractor (Markup): The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:

Labor 33%
Materials 15%
Equipment Rental 15%
Other Items and Expenditures 15%

2. Extra Work by Subcontractor (Markup): When all or any part of the extra work is performed by a Subcontractor, the markup provided for the Contractor in 6.06.E.1 shall apply to the Subcontractor’s actual costs. A markup of 5% on the subcontracted portion of each extra work may be added for the Contractor.

Page 48 of 133 ends

F. Net Allowable Costs
If anyone scope change involves both Extra Work and deleted work in the same portion of the Work and the additive allowable costs exceed the deductive allowable costs, the Allowable Markups on the Extra Work will be only the difference between the two amounts.

6.07 CITY ORIGINATED REQUEST FOR ITEMIZED CHANGE ORDER PROPOSAL REQUEST City may issue a Construction Change Directive or other written request to Contractor describing a proposed change to the Work and requesting the Contractor submit an itemized change order proposal in a format acceptable to City within ten (10) calendar days after City issues the request. The Contractor's change order proposal shall include an analysis of impacts to cost and time, if any, to perform additional work, change Work or delete Work, as applicable, including the effects and impacts, if any, on unchanged Work, estimates of costs (broken down by the cost categories listed in this Paragraph), and Contractor's proposed methods to minimize costs, delay, and disruption to the performance of the Work. If Contractor fails to submit a written change order proposal within such period of time, it shall be presumed that the change described in the City's original proposal request will not result in an increase to the Contract Sum or Contract Time and the change shall be performed by Contractor without additional compensation to Contractor. City's request for itemized change order proposal request does not authorize the Contractor to commence performance of the change.

If City desires that the proposed change be performed, the Work shall be authorized according to the Change Order or Construction Change Directive procedures set forth herein.

6.08 CONTRACTOR ORIGINATED CHANGE ORDER REQUEST (COR)
If the Contractor believes that instructions issued by the City after the effective date of the Contract will result in changes to the Contract Sum or Contract Time or if the Contractor otherwise becomes aware of the need for or desirability of a change in the Work, Contractor may submit a written Change Order Request ("COR") to the City in writing, in a format acceptable to City and in accordance with the notice provisions and other requirements of Article 7 below for Claims. The COR must specify the reasons for the proposed change, cost impacts and relevant circumstances and impacts on the Construction Schedule. The document shall be complete in its description of the Work, its material and labor quantities and detail, and must support and justify the costs and credits claimed by the Contractor. A Critical Path Method schedule Fragnet is required to support and justify any additional time of performance requested by the Contractor. The City will not review any COR which is incomplete. The Contractor may request additional compensation and/or time through a COR but not for instances that occurred more than ten (10) calendar days prior to the notice date. Contractor's failure to initiate a COR within this ten-day period or to provide detailed back-up documentation to substantiate the COR within thirty (30) calendar days of the initial written notice shall be deemed a waiver of the right to adjustment of the Contract Sum or the Contract Time for the alleged change. Any COR that is approved by the City shall be incorporated in a Change Order or Construction Change Directive. If the COR is denied but the Contractor believes that it does have merit, the Contractor shall proceed with the disputed Work and may submit a Claim in accordance with the procedures set forth herein.

6.09 ISSUANCE OF WORK DIRECTIVE (UNILATERAL).

In the event of a dispute as to whether or not Extra Work is required, City shall have the right to unilaterally issue a Work Directive; Contractor shall continue performance of disputed Work pending resolution and shall maintain and submit to City all accounting and cost data necessary to substantiate Contractor’s cost of such disputed Work.
[END OF ARTICLE]

Page 49 of 133 ends

ARTICLE 7 - CONTRACT PAYMENTS AND CLAIMS

7.01 GENERAL
A. Payment will be made at the price for each item listed on the bidding form or as Extra Work as provided in the General Conditions.

B. Initial progress payment will not be made prior to approval by the Director of the Schedule of Values, the Construction Progress Schedule, and the Schedule of Submittals.

C. No subsequent progress payment will be made prior to receipt by the Director of the monthly revision of the Construction Progress Schedule.

7.02 SCHEDULE OF VALUES FOR PAYMENTS
A. Submission
Upon City’s request, the three (3) lowest bidders shall complete and submit a Preliminary Schedule of Values, within seven (7) calendar days.

In addition, Contractor shall complete and furnish within seven (7) calendar days after receiving the Notice of Award of the Construction Contract a Final Schedule of Values giving a complete breakdown of the Contract Sum for each component of the Work.

B. Content
The Schedule of Values shall be in sufficient detail as the Director may, in its discretion, deem necessary to evaluate progress at any point in the performance of the Work. Unless otherwise specified in the Contract Documents, the Schedule of Values shall include, without limitation, a breakdown of the general categories of Subcontractor work, direct overhead, profit and contingency, and a further breakdown of the general categories of Subcontractor work into separate trade line items of costs for Subcontractor services, labor and material, which is based on actual Subcontractor contract, subcontract, purchase order or vendor prices. If requested by Director, Contractor shall revise the Schedule of Values to allocate sums for Contractor overhead, profit and/or contingency among the individual line items for trade portions of the Work. No amounts shall be reflected in the Schedule of Values or Application for Payment for Extra Work or Deleted Work for which a Change Order has not been executed by Contractor and City or for which a Construction Change Directive has not been issued by City. Amounts that have been mutually agreed to by Change Order or unilaterally determined by City pursuant to a Construction Change Directive shall be segregated from the cost of the base Contract Work and separately listed by line item in the Schedule of Values. The Schedule of Values must be prepared in sufficient detail and supported by sufficient data to substantiate its accuracy as the Director may require.

C. Applications for Payment
The Schedule of Values, when approved by the Director, shall be used as a basis for Contractor's Applications for Payment and may be considered as fixing a basis for adjustments to the Contract Sum.

Page 50 of 133 ends

D. Revisions
If, at any time, it is determined that the Schedule of Values does not allocate the Contract Sum in a manner that reasonably and fairly reflects the actual costs anticipated to be progressively incurred by Contractor, it shall be revised and resubmitted for the Director’s approval.

7.03 APPLICATIONS FOR PAYMENT
A. Marked Schedule of Values
Five (5) Days prior to the date set forth in Paragraph 7.03-B below for the monthly progress payment meeting, Contractor shall submit to Director a copy of the proposed Schedule of Values, marked to show the percentage of completion certified by Contractor for each line item in the Schedule of Values, including any stored materials approved for payment by City pursuant to Paragraph 7.03-D, below and any withholdings from Contractor proposed by Director.

B. Monthly Review
For the purpose of expediting the progress payment procedure, Contractor shall meet with the Director on or before the twentieth (20th) day of each month to review the Contractor's marked Schedule of Values prepared in accordance with Paragraph 7.03-A, above. The Director shall revise as appropriate and sign the marked Schedule of Values to verify such review. If any item in the marked Schedule of Values submitted for payment is disputed during this review, Contractor agrees to use its best efforts to resolve the disputed items with the Director before submitting its Application for Payment. If the Director and Contractor cannot agree, then the percentage completion shall be established at such percentage as the Director, in good faith, determines is appropriate to the actual progress of the Work. No inaccuracy or error in the Director’s good faith estimate shall operate to release Contractor or Surety from any responsibility or liability arising from or related to performance of the Work. The Director shall have the right subsequently to correct any error and dispute any item submitted in Contractor's Application for Payment, regardless of whether an item was identified as disputed in the review process provided for herein.

C. Certification
Each Application for Payment shall be signed and certified by Contractor under penalty of perjury to City that:

1. The data comprising the Application for Payment is accurate and the Work has progressed to the point indicated;

2. To the best of Contractor's knowledge, information and belief, the Work is in accordance with the Contract Documents;

3. Contractor is entitled to payment in the amount certified; and

4. All sums previously applied for by Contractor on account of Work performed by Subcontractors and that have been paid by City have been paid to the Subcontractors performing such Work, without any retention, withholding or backcharge by Contractor.

Page 51 of 133 ends

D. Stored Materials
Payments may be made by City, at its discretion, on account of materials or equipment not incorporated into the Work but delivered on the ground at the Site and suitably stored by Contractor or stored off-Site under the control of City. Such payments shall only be considered upon submission by Contractor of satisfactory evidence that it has acquired title to same, that the material or equipment will be utilized in the Work and that the material is satisfactorily stored, protected and insured, and that such other procedures are in place satisfactory to City to protect City's interests. To be considered for payment, materials or equipment stored off-Site shall, in addition to the above requirements and unless otherwise specifically approved by City in writing, be stored in a bonded warehouse, fully insured, and available to City for inspection. City shall have sole discretion to determine the amount of material and equipment that may be stored on the Site at any given time.

7.04 PROGRESS PAYMENTS
A. Conditions to Progress Payments
Contractor shall submit its Application for Payment to the Director, using such forms as required by City, once a month on or before the first (1st) Day of the month following the month in which the Work that is the subject of such Application for Payment was performed. Without limitation to any other provisions of the Contract Documents, the following shall be conditions precedent to a proper submission and to the Director approval of each Application for Payment:

1. Submission of a Schedule of Values that reflects the percentages of completion either agreed to or determined by Director in accordance with Paragraph 7.03-B, above;

2. Submission of the Contractor's certification required by Paragraph 7.03-C, above;

3. Submission of conditional releases of stop notice, if any, and bond rights upon progress payment, complying with California Civil Code Section 8132, for all Work performed during the time period covered by the current Application for Payment, signed by Contractor, its Subcontractors of every tier, and all material suppliers to each, and (2) forms of unconditional release of stop notice and bond rights upon progress payment, complying with California Civil Code Section 8134 for all Work performed during the time period covered by the previous Application for Payment, signed by Contractor, its Subcontractors of every tier and all material suppliers to each;

4. Compliance by Contractor with its obligation for maintenance of As-Builts as required by the Contract Documents;

5. Compliance by Contractor with its obligation for submission of monthly and daily reports as required by the Contract Documents;

6. Compliance by Contractor with its obligations for submission of scheduling information and updating of the Construction Schedule as required by Article 4, above and other provisions of the Contract Documents pertaining to preparation or updating of schedule information;

7. Submission of certified payroll records as required by the Contract Documents;

Page 52 of 133 ends

8. Submission of certifications by Contractor and each Subcontractor as required by applicable collective bargaining agreements certifying that all employee benefit contributions due and owed pursuant to any applicable collective bargaining agreement have been paid in full; and

9. Compliance by Contractor with all of its other obligations for submission of documentation or performance of conditions which, by the terms of the Contract Documents, constitute conditions to Contractor's right to receive payment for Work performed.

B. Payments by City
Pursuant to California Public Contract Code Section 20104.50, City shall make progress payment of undisputed sums due within thirty (30) Days after receipt by Director of an undisputed and properly submitted Application for Payment, calculated on the basis of ninety-five percent (95%) of value determined pursuant to Paragraph 7.03-B above of the following:

1. The portion of the Work permanently installed and in place;

2. Plus, the value of materials delivered on the ground or in storage as approved by City pursuant to Paragraph 7.03-D, above,

3. Less, the aggregate of previous payments, and

4. Less, any other withholdings authorized by the Contract Documents.

C. Rejection by City
Any Application for Payment determined not to be undisputed, proper and suitable for payment shall be returned to Contractor as soon as practicable, but not later than seven (7) Days, after receipt by City accompanied by an written explanation of the reasons why the payment request was rejected.

Failure by City or Director to either timely reject an Application for Payment or specify any grounds for rejection shall not constitute a waiver of any rights by City. Applications for Payment that are rejected shall be corrected and resubmitted within seven (7) Days after receipt by Contractor.

D. Interest
If City fails to make a progress payment to Contractor as required by Paragraph 7.04-B, above, City shall pay interest to Contractor equivalent to the legal rate set forth in subdivision (a) of California Code of Civil Procedure Section 685.010. The number of Days available to City to make payment pursuant to Paragraph 7.04-B, above without incurring interest pursuant to this Paragraph shall be reduced by the number of Days by which City exceeds the seven (7) Day return requirement applicable to City as set forth in Paragraph 7.04-C, above.

7.05 FINAL PAYMENT
A. Retention
ln addition to withholdings permitted by Paragraph 7.09 below, a sum equal to five percent (5%) of all sums otherwise due to Contractor as progress payments shall be withheld by city pursuant to Paragraph 7.04-B from each progress payment (“Retention”) and retained until such time as it is due as described herein. A higher Retention amount may be approved by the City Council where project is deemed “substantially complex” by City Council.

Page 53 of 133 ends

B. Conditions to Final Payment
Contractor shall submit its Application for Final Payment, using such forms as required by Director, prior to requesting a final inspection of the Work in accordance with Paragraph 3.06 above. Such Application for Final Payment shall be accompanied by all the following:

1. An affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project for which City or City's property or funds might be liable have been paid or otherwise satisfied;

2. Contractor’s certification as required by Paragraph 7.03-C, above;

3. Consent of surety, if any, to Final Payment;

4. A certificate evidencing that the insurance required by the Contract Documents is in force;

5. Conditional Waiver and Release Upon Final Payment in the form required by California Civil Code Section 8136 executed by Contractor, all Subcontractors of every tier and by all material suppliers of each, covering the final payment period;

6. Unconditional Waiver and Release Upon Progress Payment in the form required by California Civil Code Section 8136 executed by Contractor, all Subcontractors of every tier and by all material suppliers of each, covering the previous payment period;

7. All Record Documents (including, without limitation, complete and accurate As-Built drawings which shall be kept up to date during the performance of the Work);

8. Documentation that Contractor has inspected, tested, and adjusted performance if every system or facility of the Work to ensure that overall performance is in compliance with the terms of the Contract Documents;

9. Four (4) copies of all warranties from vendors and Subcontractors, operation and maintenance manuals, instructions and related agreements, and equipment certifications and similar documents;

10. Certifications by Contractor and each Subcontractor as required by applicable collective bargaining agreements that all employee benefit contributions due and owing pursuant to any applicable collective bargaining agreement have been paid in full;

11. Releases of rights and claims relating to patents and trademarks, as required by the Contract Documents; and

12. Any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion.

C. Final Payment
Pursuant to the Public Contract Code Section 7107, within sixty (60) Days after City issues the Notice

Page 54 of 133 ends

of Completion to Contractor, the Final Payment, including Retention, shall be released to Contractor, subject to the City’s right to withhold 150% of any disputed amounts.

D. Disputed Amounts
Pursuant to California Public Contract Code 7107, City may deduct and withhold from the Final Payment due under Paragraph 7.05-C, above, an amount up to 150% of any disputed amounts, including, without limitation, amounts to protect City against any loss caused or threatened as a result of Contractor's failing to fully perform all of those obligations that are required to be fulfilled by Contractor as a condition to Final Completion and Final Payment. Alternatively, City may elect, in its sole discretion, to accept the Work without correction or completion and adjust the Contract Sum pursuant to the Contract Documents.

E. Acceptance of Final Payment
Acceptance of Final Payment by Contractor shall constitute a waiver of all rights by Contractor against City for recovery of any loss, excepting only those Claims that have been submitted by Contractor in the manner required by the Contract Documents prior to or at the time of the Final Payment.

7.06 MISCELLANEOUS
A. Joint Payment
City shall have the right, if deemed necessary in its sole discretion, to issue joint checks made payable to Contractor and any Subcontractor(s) of any Tier. The joint check payees shall be solely responsible for the allocation and disbursement of funds included as part of any such joint payment.

Endorsement on such check by a payee shall be conclusively presumed to constitute receipt of payment by such payee. In no event shall any joint check payment be construed to create any contract between City and a Subcontractor of any Tier, any obligation from City to such Subcontractor or any third party rights against City or Director.

B. Withholding/Duty to Proceed
The payment, withholding or retention of all or any portion of any payment claimed to be due and owing to Contractor shall not operate in any way to relieve Contractor from its obligations under the Contract Documents. Contractor shall continue diligently to prosecute the Work without reference to the payment, withholding or retention of any payment. The partial payment, withholding or retention by City in good faith of any disputed portion of a payment, whether ultimately determined to be correctly or incorrectly asserted, shall not constitute a breach by City of the Construction Contract and shall not be grounds for an adjustment of the Contract Sum or Contract Time.

C. No Acceptance
No payment by City or partial or entire use of the Work by City shall be construed as approval or acceptance of the Work, or any portion thereof.

D. Contractor Payment Warranty
Submission of an Application for Payment shall constitute a representation and warranty by Contractor that:

Page 55 of 133 ends

1. Title to Work covered by an Application for Payment will pass to City either by incorporation into the construction or upon receipt of payment by Contractor, whichever occurs first; and

2. Work covered by previous Applications for Payment are free and clear of liens, stop notices, claims, security interests or encumbrances imposed by the Contractor or any other person.

E. Corrections
No inaccuracy or error in any Application for Payment provided by Contractor shall operate to release Contractor from the error, or from losses arising from the Work, or from any obligation imposed by the Contract Documents. City retains the right to subsequently correct any error made in any previously approved Application for Payment, or progress payment issued, by adjustments to subsequent payments.

7.07 PAYMENTS BY CONTRACTOR
Contractor shall not include in its Applications for Payment sums on account of any Subcontractor's portion of the Work that it does not intend to pay to such Subcontractor. Upon receipt of payment from City, Contractor shall pay the Subcontractor performing Work on the Project, out of the amount paid to Contractor on account of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and applicable laws, including, without limitation, California Public Contract Code Section 7107. Contractor shall remain responsible notwithstanding a withholding by City pursuant to the terms of these Contract Documents, to promptly satisfy from its own funds sums due to all Subcontractors who have performed Work that is included in Contractor's Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its subcontractors and material suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payment to a Subcontractor of any tier or material supplier.

7.08 PAYMENTS WITHHELD
A. Withholding by City
In addition to any other amounts which City may have the right to retain under the Contract Documents, City may withhold a sufficient amount of any payment otherwise due to Contractor as City, in its sole discretion, may deem necessary to cover actual or threatened loss due to any of the following:

1. Third Party Claims. Third-party claims or stop notices filed or reasonable evidence indicating probable filing of such claims or stop notices. City shall promptly inform Contractor of any third party claims related to this Contract.

2. Defective Work. Defective Work not remedied;

3. Nonpayment. Failure of Contractor to make proper payments to its Subcontractors for services, labor, materials or equipment;

4. Inability to Complete. Reasonable doubt that the Work can be completed for the then unpaid balance of the Contract Sum or within the Contract Time;

Page 56 of 133 ends

5. Violation of Applicable Laws. Failure of Contractor or its Subcontractors to comply with applicable laws or lawful orders of governmental authorities;

6. Penalty. Any claim or penalty asserted against City by virtue of Contractor’s failure to comply with applicable laws or lawful orders of governmental authorities (including, without limitation labor laws);

7. Failure to Meet Contract Time. Any damages which may accrue as a result of Contractor failing to meet the Construction Schedule or failing to perform within the Contract Time;

8. Setoff. Any reason specified elsewhere in the Contract Documents as grounds for a withholding offset or set off or that would legally entitle City to a set-off or recoupment;

9. Consultant Services. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with the Contract Documents;

10. Liquidated Damages. Liquidated damages assessed against Contractor;

11. Materials. Materials ordered by City pursuant to the Contract Documents;

12. Damages. Loss caused by Contractor or Subcontractor to City, Separate Contractors or any other person or entity under contract to City;

13. Clean Up. Clean up performed by City and chargeable to Contractor pursuant to the Contract Documents;

14. Employee Benefits. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to any applicable collective bargaining agreement or trust agreement;

15. Required Documents. Failure of Contractor to submit on a timely basis, proper and sufficient documentation required by the Contract Documents, including, without limitation, Construction Schedule updates, ‘look ahead’ schedules, Submittals, Schedules of Values, information on Subcontractors, Change Orders, certifications and other required reports or documentation; and

16. Other Breach. A breach of any obligation or provision of the Contract Documents.

B. Release of Withholding
If and when City determines, in its sole discretion, that the above grounds for withholding have been removed and that all losses incurred or threatened have been paid, credited or otherwise satisfied, then payment shall be made for amounts withheld because of them.

C. Application of Withholding
City may apply sums withheld pursuant to Paragraph 7.08-A above, in payment of any loss or threatened loss as City determines, in its sole discretion, to be appropriate. Such payments may be made without a prior judicial determination of City’s actual rights with respect to such loss. Contractor agrees and hereby designates City as its agent for such purposes, and agrees that such payments shall be considered as payments made under Construction Contract by City to Contractor. City shall not be liable to Contractor for such payments made in good faith. City shall submit to Contractor an accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City

Page 57 of 133 ends

may, in its sole discretion, elect to exercise its right to adjust the Contract Sum as provided in the Contract Documents.

D. Continuous Performance
Provided City pays the undisputed portion, if any, of funds withheld in good faith, Contractor shall maintain continuous and uninterrupted performance of the Work during the pendency of any disputes or disagreements with City.

7.09 SUBSTITUTION OF SECURITIES
A. Public Contract Code
Pursuant to the requirements of California Public Contract Code Section 22300, upon Contractor’s request, City will make payment to Contractor of any funds withheld from payments to ensure performance under the Contract Documents if Contractor deposits with City, or in escrow with a California or federally chartered bank in California acceptable to City (“Escrow Agent”), securities eligible for the investment of State Funds under Government Code Section 16430, or bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City, upon the following conditions:

1. Contractor shall be the beneficial owner or any securities substituted for monies withheld for the purpose of receiving any interest thereon.

2. All expenses relating to the substitution of securities under Public Contract Code Section 22300 and under this Paragraph 7.04, including, but not limited to City’s overhead and administrative expenses, and expenses of Escrow Agent shall be the responsibility of Contractor.

3. Securities or certificates of deposit substituted for monies withheld shall be of a value of at least equivalent to the amounts of retention to be paid to Contractor pursuant to the Contract Documents.

4. If Contractor chooses to deposit securities in lieu of monies withheld with an Escrow Agent, Contractor, City and Escrow Agent shall, as a prerequisite to such deposit, enter into an escrow agreement, using the City’s form, “Escrow Agreement for Deposit of Securities in Lieu of Retention.”

5. Contactor shall obtain the written consent of Surety to such agreement.

6. Securities, if any, shall be returned to Contractor only upon satisfactory Final Completion of the Work.

B. Substitute Security
To minimize the expense caused by such substitution of securities, Contractor shall, prior to or at the time Contractor requests to substitute security, deposit sufficient security to cover the entire amount to be withheld. Should the current market value of such substituted security fall below the amount for which it was substituted, or any other amounts which the City withholds pursuant to the Contract Documents, Contractor shall immediately and at Contractor’s expense and at no cost to City deposit additional security qualifying under Public Contract Code Section 22300 until the current market value of the total security deposited is no less than the amount subject to withholding under the Contract

Page 58 of 133 ends

Documents. Securities shall be valued as often as conditions of the securities market warrant, but in no case less frequently than once per month.

C. Deposit of Retentions
Alternatively, subject to the conditions set forth in Paragraph 7.04-A above, upon request of Contractor, City shall make payment of retentions directly to Escrow Agent at the expense of Contractor, provided that Contractor, City and Escrow Agent shall, as a prerequisite such payment, enter into an escrow agreement in the same form as prescribed in Part 4 of Paragraph A, above. At the expense of Contractor and at no cost to City, Contractor may direct the investment of the payments into securities and interest bearing accounts, and Contractor shall receive the interest earned on the investments. Escrow Agent shall hold such direct payments by City under the same terms provided herein for securities deposited by Contractor. Upon satisfactory Final Completion of the Work, Contractor shall receive from Escrow Agent all securities, interest and payments received by Escrow Agent from City, less escrow fees and charges of the Escrow Account, according to the terms of Public Contract Code Section 22300 and the Contract Documents.

D. Time for Election of Substitution of Securities
Notwithstanding the provision of 7.04 A, B, and C above and California Public Contract Code Section 22300, the failure of Contractor to request the Substitution of eligible securities for monies to be withheld by City within ten (10) days of the award of Contract to Contractor shall be deemed to be a waiver of all such rights.

7.10 CLAIMS
A. Arising of Claim.

1. Scope Change. When Contractor has a claim for an increase in the Contract Sum or Contract Time due to a scope change which has not yet become final, a “claim” will be deemed to arise once the Director has issued a decision denying, in whole or in part, the Contractor’s Change Order Request.

2. Other Claims. In the case of a Claim by Contractor that does not involve an adjustment to the Contract Sum or Contract Time due to a scope change and which has not become final, the Claim may be asserted if, and only if, Contractor gives written notice to City of intent to file the Claim within three (3) days of the date of discovery relative to such circumstances (even if Contractor has not yet been damaged or delayed). Such written notice of intent to file a Claim shall be valid if, and only if, it identifies the event or condition giving rise to the Claim, states its probable effect, if any with respect to Contractor's entitlement to an adjustment of the Contract Sum or Contract Time and complies with the requirements of Paragraph 7.11-B, below. For purposes of this Paragraph 7.11, a Claim for which such written notice is required and has been given by Contractor shall be deemed to arise on the date that such written notice is received by City.

B. Content of Claim
A Claim by Contractor must include all of the following:

1. A statement that it is a Claim and a request for a decision on the Claim;

Page 59 of 133 ends

2. A detailed description of the act, error, omission, unforeseen condition, event or other circumstance giving rise to the Claim.

3. If the Claim involves an adjustment to the Contract Sum or Contract Time due to a change in scope, a statement demonstrating that all requisite notices were provided, including, without limitation, timely written notice and a Change Order Request as required by Article 6 of these General Conditions and timely notice of delay and request for extension of time in accordance with Article 3. If the Claim does not involve an adjustment to the Contract Sum or Contract Time due to a change in scope, a statement demonstrating that a notice of intent to file the Claim was timely submitted as required by Paragraph 7.10-A.2, above;

4. A detailed justification for any remedy or relief sought by the Claim including without limitation, a detailed cost breakdown in the form' required for submittal of Change Order Requests and actual job cost records demonstrating that the costs have been incurred;

5. If the Claim involves a request for adjustment of the Contract Time, written documentation demonstrating that Contractor has complied with the requirements of the Contract Documents and written substantiation (including, without limitation, a Time Impact Analysis) demonstrating that Contractor is entitled to an extension of time under the Contract Documents; and

6. A written certification signed by a managing officer of Contractor's organization, who has the authority to sign contracts and purchase orders on behalf of Contractor and who has personally investigated and confirmed the truth and accuracy of the matters set forth in such certification, in the 'following form:
"I hereby certify under penalty of perjury that I am a managing officer of (Contractor's name) and that I have reviewed the Claim presented herewith on Contractor's behalf and/or on behalf of (Subcontractor's name) and that, to the best of my knowledge after conducting a diligent inquiry into the facts of the Claim, the following statements are true and correct:

The facts alleged in or that form the basis for the Claim are, to the best of my knowledge following diligent inquiry, true and accurate; and,
(a) I do not know of any facts or circumstances, not alleged in the Claim, that by reason of their not being alleged render any fact or statement alleged in the Claim materially misleading; and,
(b) I have, with respect to any request for money or damages alleged in or that forms the basis for the Claim, reviewed the job cost records (including those maintained by Contractor and by any Subcontractor, of any tier, that is asserting all or any portion of the Claim) and confirmed with reasonable certainty that the losses or damages suffered by Contractor and/or such Subcontractor were in fact suffered in the amounts and for the reasons alleged in the Claim; and, (c) I have, with respect to any request for extension of time or claim of delay, disruption, hindrance or interference alleged in or that forms the basis for the Claim, reviewed the job schedules (including those maintained by Contractor and the Subcontractor, of any tier, that is asserting all or any portion of the Claim) and confirmed on an event-by-event basis that the delays or disruption suffered by Contractor and/or such Subcontractor were in fact experienced for the durations, in the manner, and with the consequent effects on the time and/or sequence of

Page 60 of 133 ends

performance of the Work, as alleged in the Claim; and,
(d) I have not received payment from City for, nor has Contractor previously released City from, any portion of the Claim.”
Signature: Date:

Name:

Title:

Company
C. Noncompliance
Failure to submit any of the information, documentation or certifications required by Paragraph 7.10- B, above, shall result in the Claim being returned to Contractor without any decision.

D. Submission of Claims

1. Director. Claims shall be first submitted to the City for decision by the Director.

2. Continuous Work. Notwithstanding the making of any Claim or the existence of any dispute regarding any Claim, unless otherwise directed by City, Contractor shall not delay, slow or stop performance of the Work, but shall diligently proceed with performance in accordance with the Contract Documents and City will continue, to make undisputed payments as by the Contract Documents.

3. Time for Filing. All Claims and supporting documentation and certifications must be filed within thirty (30) days after the Claim arises. No Claims shall be filed after Final Payment.

4. Conditions Precedent. No Claim may be asserted unless Contractor has strictly complied with the requirements of this Paragraph 7.10-D, which shall be considered conditions precedent to Contractor’s right to assert the Claim and to initiate the Dispute Resolution Process with respect to such Claim.

E. Response to Claims, Meet and Confer

1. Claims less than $50,000. Claims less than $50,000 shall be responded to by City in writing within forty-five (45) days of receipt of the Claim, unless City requests additional information or documentation of the Claim within thirty (30) days of receipt of the Claim, in which case City shall respond to the Claim within fifteen (15) days after receipt of the further information or documentation or within a period of time no greater than that taken by Contractor in producing the additional information or documentation, whichever is greater.

2. Claims $50,000 or more. Claims $50,000 or more shall be responded to by City in writing within (60) days of receipt of the Claim, unless City requests additional information or documentation of the Claim within thirty (30) days of receipt of the Claim, in which case City shall respond to the Claim within thirty (30) days after receipt of the further information or documentation or within a period of time no greater than that taken by Contractor in producing the additional information or documentation, whichever is greater.

Page 61 of 133 ends

3. Meet and Confer. If Contractor disputes City's response, or if City fails to respond within the prescribed time set forth in Paragraph 7.10-E.1 and 7.10-E.2, above, Contractor may so notify City, in writing, within fifteen (15) days of City's response, or within fifteen (15) days of City’s response due date in the event of a failure to respond, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon such demand, City shall schedule a meet and confer conference within thirty (30) days of such demand, for discussion of settlement of the dispute.

F. Finality of Decision
If Contractor disputes the Director’s decision under this Article, it shall commence the Dispute Resolution Process as set forth in Article 15 of these General Conditions by filing a Statement of Dispute within seven (7) days after receipt of the Director’s response.

G. Continuing Contract Performance/Duty to Proceed with Disputed Work Contractor shall not delay or postpone any Work pending resolution of any claims, disputes or disagreements. Pending final resolution of a claim, the Contactor shall proceed diligently with performance of the Contract and the City shall continue to make payments for undisputed Work in accordance with the Contract Documents. In the event of disputed Work, City shall have the right to unilaterally issue a Work Directive and Contractor shall continue performance pending resolution of the dispute and shall maintain the accounting and cost data to substantiate the cost of such disputed work. [END OF ARTICLE]

Page 62 of 133 ends

ARTICLE 8 - MATERIALS AND EQUIPMENT

8.01 GENERAL
A. The Contractor shall furnish all materials and equipment needed to complete the Work and installations required under the terms of this Contract, except those materials and equipment specified to be furnished by the City.

B. The Contractor shall submit satisfactory evidence that the materials and equipment to be furnished and used in the work are in compliance with the Specifications. Materials and equipment incorporated in the Work and not specifically covered in the Specifications shall be the best of their kind. Unless otherwise specified, all materials and equipment incorporated in the Work under the Contract shall be new.

8.02 QUALITY AND WORKMANSHIP
All material and equipment furnished by the Contractor shall be new, high grade, and free from defects and imperfections, unless otherwise hereinafter specified. Workmanship shall be in accordance with the best standard practices. All materials and equipment must be of the specified quality and equal to approved samples, if samples have been required. All Work shall be done and completed in a thorough, workmanlike manner, notwithstanding any omission from the Specifications or Drawings, and it shall be the duty of the Contractor to call attention to apparent errors or omissions and request instructions before proceeding with the Work. The Director may, by appropriate instructions, correct errors and supply omissions, which instructions shall be binding upon the Contractor as though contained in the original Specifications or Drawings. All Work performed under the Specifications will be inspected by the Director as provided in Paragraph 8.04. All materials and equipment furnished and all Work done must be satisfactory to the Director. Work, material, or equipment not in accordance with the Specifications, in the opinion of the Director shall be made to conform thereto. Unsatisfactory materials and equipment will be rejected, and if so ordered by the Director, shall, at the Contractor's expense, be immediately removed from the vicinity of the Work.

8.03 TRADE NAMES AND "OR APPROVED EQUAL" PROVISION
Whenever in the Specifications or Drawings the name or brand of a manufactured article is used it is intended to indicate a measure of quality and utility or a standard. Except in those instances where the product is designated to match others in use on a particular improvement either completed or in the course of completion, the Contractor may substitute any other brand or manufacture of equal appearance, quality, and utility on approval of the Director, provided the use of such brand or manufacture involves no additional cost to the City.

8.04 APPROVAL OF MATERIALS
A. The Contractor shall furnish without additional cost to the City such quantities of construction materials as may be required by the Director for test purposes. He/she shall place at the Director's disposal all available facilities for and cooperate with him in the sampling and testing of all materials and workmanship. The Contractor shall prepay all shipping charges on samples. No samples are to be submitted with the bids unless otherwise specified.

B. Each sample submitted shall be labeled. A letter, in duplicate, submitting each shipment of samples shall be mailed to the Director by the Contractor. Both the label on the sample and the letter of transmittal shall indicate the material represented, its place of origin, the names of the producer and the Contractor, the Specifications number and title, and a reference to the applicable Drawings and Specifications paragraphs.

Page 63 of 133 ends

C. Materials or equipment of which samples are required shall not be used on the Work until approval has been given by the Director in writing. Approval of any sample shall be only for the characteristics of the uses named in such approval and no other. No approval of a sample shall be taken in itself to change or modify any Contract requirement.

D. Failure of any material to pass the specified tests, including life cycle maintenance data may be sufficient cause for refusal to consider under this Contract, any further sample of the same brand or make of that material.

8.05 ORDERING MATERIALS AND EQUIPMENT
One copy of each of the Contractor's purchase orders for materials and equipment forming a portion of the Work must be furnished to the Director, if requested. Each such purchase order shall contain a statement that the materials and equipment included in the order are subject to inspection by the City. Materials and equipment purchased locally will, at the City’s discretion, be inspected at the point of manufacture or supply, and materials and equipment supplied from points outside the Los Angeles area will be inspected upon arrival at the job, except when other inspection requirements are provided for specific materials in other sections of the Contract Documents.

8.06 AUTHORITY OF THE DIRECTOR
A. On all questions concerning the acceptability of materials or machinery, the classification of materials, the execution of the Work, and conflicting interests of Contractors performing related work, the decision of the Director shall be final and binding.

B. The Director will make periodic observations of materials and completed work to observe their compliance with Drawings, Specifications, and design and planning concepts, but he/she is not responsible for the superintendence of construction processes, site conditions, operations, equipment, personnel, or the maintenance of a safe place to work or any safety in, on, or about the site of work.

8.07 INSPECTION
All materials furnished and work done under this Contract will be subject to rigid inspection. The Contractor shall furnish, without extra charge, the necessary test pieces and samples, including facilities and labor for obtaining them, as requested by the Director. The Director, or his/her authorized agent or agents, at all times shall have access to all parts of the shop and the works where such materials under his/her inspection is being manufactured or the work performed. Work or material that does not conform to the Specifications, although accepted through oversight, may be rejected at any stage of the Work. Whenever the Contractor is permitted or directed to do night work or to vary the period during which work is carried on each day, he/she shall give the Director due notice, so that inspection may be provided. Such work shall be done under regulations to be furnished in writing by the Director.

8.08 INFRINGEMENT OF PATENTS
The Contractor shall hold and save the City, its officers, agents, servants, and employees harmless from and against all and every demand or demands, of any nature or kind, for or on account of the use of any patented invention, process, equipment, article, or appliance employed in the execution of the Work or included in the materials or supplies agreed to be furnished under this Contract, and should the Contractor, his/her agents, servants, or employees, or any of them, be enjoined from furnishing or using any invention, process, equipment, article, materials, supplies or appliance supplied or required to be supplied or used under this Contract, the Contractor shall promptly substitute other inventions, processes, equipment, articles, materials, supplies, or

Page 64 of 133 ends

appliances in lieu thereof, of equal efficiency, quality, finish, suitability, and market value, and satisfactory in all respects to the Director. Or in the event that the Director elects, in lieu of such substitution, to have, supplied, and to retain and use, any such invention, process, equipment, article, materials, supplies, or appliances, as may by this Contract be required to be supplied and used, in that event the Contractor shall at his/her expense pay such royalties and secure such valid licenses as may be requisite and necessary to enable the City, its officers, agents, servants, and employees, or any of them, to use such invention, process, equipment, article, materials, supplies, or appliances without being disturbed or in way interfered with by any proceeding in law or equity on account thereof. Should the Contractor neglect or refuse promptly to make the substitution hereinbefore required, or to pay such royalties and secure such licenses as may be necessary and requisite for the purpose aforesaid, then in that event the Director shall have the right to make such substitution, or the City may pay such royalties and secure such licenses and charge the cost thereof against any money due the Contractor from the City, or recover the amount thereof from him/her and his/her surety, notwithstanding final payment under this Contract may have been made.
[END OF ARTICLE]

Page 65 of 133 ends

ARTICLE 9 – SUBMITTALS

9.01 GENERAL
A. The Contractor shall submit samples, drawings, and data for the Director's approval which demonstrate fully that the construction, and the materials and equipment to be furnished will comply with the provisions and intent of the Drawings and Specifications.

B. Specific items to be covered by the submittals shall include, as a minimum, the following:

1. For structures, submit all shop, setting, equipment, miscellaneous iron and reinforcement drawings and schedules necessary.

2. For conduits, submit a detailed layout of the conduit with details of bends and fabricated specials and furnish any other details necessary. Show location of shop and field welds.

3. For equipment which requires electrical service, submit detailed information to show power supply requirements, wiring diagrams, control and protection schematics, shop test data, operation and maintenance procedures, outline drawings, and manufacturer's recommendation of the interface/interlock among the equipment.

4. For mechanical equipment submit all data pertinent to the installation and maintenance of the equipment including shop drawings, manufacturer's recommended installation procedure, detailed installation drawings, test data and curves, maintenance manuals, and other details necessary.

5. Samples

6. Colors

7. Substitutions

8. Manuals

9. As-built drawings

10. Safety plans required by Article 10

9.02 PRODUCT HANDLING
A. Submittals shall be accompanied by a letter of transmittal and shall be in strict accordance with the provisions of this Article.

B. Submit priority of processing when appropriate.

9.03 SCHEDULE OF SUBMITTALS
A. The Contractor shall prepare and submit a schedule of submittals. The schedule of submittals shall be in the form of a submittal log. Refer to Paragraph 9.12.

Page 66 of 133 ends

9.04 SHOP DRAWINGS
A. All shop drawings shall be produced to a scale sufficiently large to show all pertinent features of the item and its method of connection to the Work.

B. All shop drawing prints shall be made in blue or black line on white background. Reproductions of City/Contract Drawings are not acceptable.

C. The overall dimensions of each drawing submitted to the Director shall be equal to one of the City's standard sheet sizes as listed below. The title block shall be located in the lower right hand corner of each drawing and shall be clear of all line Work, dimensions, details, and notes.

Sheet Sizes
Height X Width
11" X 8 1/2"
11" X 17"
24" X 36"
30” X 42”

9.05 COLORS
Unless the precise color and pattern are specified elsewhere, submit accurate color charts and pattern charts to the Director for his/her review and selection whenever a choice of color or pattern is available in a specified product. Label each chart naming the source, the proposed location of use on the project, and the project.

9.06 MANUFACTURERS' LITERATURE
Where contents of submitted literature from manufacturers includes data not pertinent to the submittal, clearly show which portions of the contents are being submitted for review.

9.07 SUBSTITUTIONS
A. The Contract is based on the materials, equipment, and methods described in the Contract Documents.

Any Contractor proposed substitutions are subject to the Director’s approval.

The Director will consider proposals for substitution of materials, equipment, and methods only when such proposals are accompanied by full and complete technical data, and all other information, including life cycle maintenance data, required by the Director to evaluate the proposed substitution.

B. Any requests for substitutions by the Contractor must be made within forty-five (45) calendar days from the Issuance Date on the Notice to Proceed. Otherwise, such requests will not be considered.

C. Trade names and "or approved equal" provision as set forth in Paragraph 8.03.

9.08 MANUALS
A. When manuals are required to be submitted covering items included in this Work, prepare and submit such manuals in approximately 8-1/2" X 11" format in durable plastic binders. In addition, manuals shall be submitted in electronic format. Manuals shall contain at least the following:

1. Identification on, or readable through, the front cover stating general nature of the manual.

Page 67 of 133 ends

2. Neatly typewritten index near the front of the manual, furnishing immediate information as to location in the manual of all emergency data regarding the installation.

3. Complete instructions regarding operation and maintenance of all equipment involved.

4. Complete nomenclature of all replaceable parts, their part numbers, current cost, and name and address of nearest vendor of parts.

5. Copy of all guarantees and warranties issued.

6. Copy of drawings with all data concerning changes made during construction.

B. Where contents of manuals include manufacturers' catalog pages, clearly indicate the precise items included in this installation and delete, or otherwise clearly indicate, all manufacturers' data with which this installation is not concerned.

9.09 AS-BUILT DRAWINGS
A. When required to be submitted covering items included in this Work, the Contractor shall deliver to the City one complete set of final As-Built hard copy drawings together with a set of AutoCAD drawing files in electronic format showing completed building, “as-built” for City records before the Contract will be accepted by the City.

B. The drawings shall be duplicates and at the same size and dimensional scale as the originals. They shall be on a polyester translucent base material with a minimum sheet thickness of .003 inch (.08mm).

C. The legibility and contrast of each drawing submitted to the City shall be such that every line, number, letter, and character is clearly readable in a full size blow back from a 35 mm microfilm negative of the drawing.

9.10 SUBMITTALS QUANTITIES
A. Submit seven (7) copies of all data and drawings unless specified otherwise.

B. Submit all samples, unless specified otherwise, in the quantity to be returned, plus two, which will be retained by the Director.

9.11 IDENTIFICATION OF SUBMITTALS
Completely identify each submittal and re-submittal by showing at least the following information:

A. Name and address of submitter, plus name and telephone number of the individual who may be contacted for further information.

B. Name of project as it appears in the Contract Documents and Specification No.

C. Drawing number and Specifications section number other than this section to which the submittal applies.

D. Whether this is an original submittal or re-submittal.

E. For samples, indicate the source of the sample.

Page 68 of 133 ends

9.12 SCHEDULE OF SUBMITTALS
A. Submit initial schedule of submittals within five (5) Working Days after the Issuance Date on Notice to Proceed.

B. Submit revised schedule of submittals within five (5) Working Days after date of request from the Director.

C. The Director will review schedule of submittals and will notify Contractor that schedule is acceptable or not acceptable within five (5) Working Days after receipt.

9.13 COORDINATION OF SUBMITTALS
A. Prior to submittal for the Director’s review, use all means necessary to fully coordinate all material, including the following procedures:

1. Determine and verify all field dimensions and conditions, materials, catalog numbers, and similar data.

2. Coordinate as required with all trades and with all public agencies involved.

3. Secure all necessary approvals from public agencies and others and signify by stamp, or other means, that they have been secured.

4. Clearly indicate all deviations from the Specifications.

B. Unless otherwise specifically permitted by the Director, make all submittals in groups containing all associated items; the Director may reject partial submittals as not complying with the provisions of the Specifications.

9.14 TIMING FOR SUBMITTALS
A. Make all submittals far enough in advance of scheduled dates of installation to provide all required time for reviews, for securing necessary approvals, for possible revision and re-submittal, and for placing orders and securing delivery.

B. In scheduling, allow at least 15 Working Days for the Director’s review, plus the transit time to and from the City office.

C. Manuals shall be submitted prior to performing functional tests.

9.15 APPROVAL BY CITY
A. Up to three (3) copies of each submittal, except manuals, schedule of costs for progress payments, and as-built drawings will be returned to the Contractor marked "No Exceptions Taken," “Make Corrections Noted - Do Not Resubmit,” or “Make Corrections Noted - Resubmit.” Manuals, schedule of costs, and as-built drawings will be returned for re-submittal if incomplete or unacceptable.

B. Submittals marked "Approved as Noted" need not be resubmitted, but the notes shall be followed.

C. If submittal is returned for correction, it will be marked to indicate what is unsatisfactory.

Page 69 of 133 ends

D. Resubmit revised drawings or data as indicated, in five (5) copies.

E. Approval of each submittal by the Director will be general only and shall not be construed as:

1. Permitting any departures from the Specifications requirements.

2. Relieving the Contractor of the responsibility for any errors and omissions in details, dimensions, or of other nature that may exist.

3. Approving departures from additional details or instructions previously furnished by the Director.

9.16 CHANGES TO APPROVED SUBMITTALS
A. A re-submittal is required for any proposed change to an approved submittal. Changes which require re-submittal include, but are not necessarily limited to, drawing revisions, changes in materials and equipment, installation procedures and test data. All re-submittals shall include an explanation of the necessity for the change.

B. Minor corrections to an approved submittal may be accomplished by submitting a "Corrected Copy". [END OF ARTICLE]

Page 70 of 133 ends

ARTICLE 10 – SAFETY

10.01 PROTECTION OF PERSONS AND PROPERTY
A. Contractor's Responsibility: Notwithstanding any other provision of the Contract Documents, the Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property, during performance of the Work. This requirement will apply continuously and will not be limited to normal working hours. Safety and sanitary provisions shall conform to all applicable Federal, State, County, and local laws, regulations, ordinances, standards, and codes. Where any of these are in conflict, the more stringent requirement shall be followed.

B. Sanitary Facilities. The Contractor shall furnish and maintain sanitary facilities by the worksites for the entire construction period.

C. Protection of the Public. The Contractor shall take such steps and precautions as his/her operations warrant to protect the public from danger, loss of life, loss of property or interruption of public services.

Unforeseen conditions may arise which will require that immediate provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract. Whenever, in the opinion of the Director, a condition exists which the Contractor has not taken sufficient precaution of public safety, protection of utilities and/or protection of adjacent structures or property, the Director will order the Contractor to provide a remedy for the condition. If the Contractor fails to act on the situation within a reasonable time period as determined by the Director, or in the event of an emergency situation, the Director may provide suitable protection by causing such work to be done and material to be furnished as, in the opinion of the Director, may seem reasonable and necessary. The cost and expense of all repairs (including labor and materials) as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the final payment due to the Contractor.

10.02 PROTECTION FROM HAZARDS
A. Trench Excavation
Excavation for any trench four (4) feet or more in depth shall not begin until the Contractor has received approval from the Director of the Contractor's detailed plan for worker protection from the hazards of caving ground during the excavation of such trench. Such plan shall show the details of the design of shoring, bracing, sloping or other provisions to be made for worker protection during such excavation.

No such plan shall allow the use of shoring, sloping or protective system less effective than that required by the Construction Safety Orders of the Division of Occupational Safety and Health, and if such plan varies from the shoring system standards established by the Construction Safety Orders, the plan shall be prepared and signed by an engineer who is registered as a Civil or Structural Director in the State of California.

B. Confined Spaces
Contractor shall comply with all of the provisions of General Industry Safety Orders of the California Code of Regulations. Entry of a confined space shall not be allowed until the Contractor has received approval from the Director of the Contractor’s program for confined space entry. Confined space means a space that (1) Is large enough and so configured that an employee can bodily enter and perform assigned Work; and (2) Has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and (3) Is not designed for continuous employee occupancy. Failure to submit a confined space entry program

Page 71 of 133 ends

may result in actions as provided in Article 5: “Suspension or Termination of Contract.” C. Material Safety Data Sheet
Contractor shall comply with all of the provisions of General Industry Safety Orders of the California Administrative Code. The Contractor shall submit to the Director a Material Safety Data Sheet (MSDS) for each hazardous substance proposed to be used, ten (10) days prior to the delivery of such materials to the job site or use of such materials at a manufacturing plant where the Director is to perform an inspection. For materials which are to be tested in City laboratories, the MSDS shall be submitted with the sample(s). Hazardous substance is defined as any substance included in the list (Director's List) of hazardous substances prepared by the Director, California Department of Industrial Relations, pursuant to Labor Code Section 6382. Failure to submit an MSDS for any hazardous substance may result in actions as provided in Article 5, "Suspension or Termination of Contract".

10.03 DIFFERING SITE CONDITIONS
A. Differing Site Conditions Defined. The Contractor shall promptly, and before such conditions are disturbed, notify the Director in writing of any Differing Site Conditions. Differing Site Conditions are those conditions, located at the project site or in existing improvements and not otherwise ascertainable by Contractor through the exercise of due diligence in the performance of its inspection obligations in the Contract Documents, encountered by Contractor in digging trenches or other excavations(s) that extend deeper than four feet below the surface of the ground that constitute:

1. Material that the Contractor believes may be material that is hazardous waste as defined in Section 25117 of the Health and Safety Code, which is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

2. Subsurface or latent physical conditions at the site differing materially from those indicated in these Contract Documents.

3. Unknown physical conditions at the site, of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in Work of the character provided for in these Contract Documents.

B. Notice by Contractor. If the Contractor encounters conditions it believes constitute Differing Site Conditions, then notice of such conditions shall, before such conditions are disturbed, be promptly reported to the Director followed within twenty-four (24) hours by a further written notice stating a detailed description of the conditions encountered.

C. The Director will promptly investigate the conditions and If he/she finds that such conditions do materially differ, or do involve hazardous waste, and do cause an increase or decrease in the Contractor's cost of, or time required for, performance of any part of the Work under this Contract, an equitable adjustment will be made, as determined by the Director.

D. Change Order Request. If Contractor intends to seek an adjustment to the Contract Sum or Contract Time based upon Differing Site Conditions, it must, within ten (10) Days after the Discovery Date relative to such conditions, submit a Change Order Request setting forth a detailed cost breakdown and Time Impact Analysis, in the form required by Article 6 of these General Conditions, of the additional Allowable Costs and Excusable Delay resulting from such Differing Site Conditions.

E. Failure to Comply. Failure by Contractor to strictly comply with the requirements of this Paragraph

Page 72 of 133 ends

10.03 concerning the timing and content of any notice of Differing Site Conditions or request for adjustment in Contract Sum or Contract Time based on Differing Site Conditions shall be deemed waiver of any right by the Contractor for an adjustment in the Contract Sum or Contract Time by reason of such conditions.

F. Final Completion. No claim by the Contractor for additional compensation for Differing Site Conditions shall be allowed if asserted after Final Payment.

G. In the event of disagreement between the Contractor and the Director whether the conditions do materially differ or whether a hazardous waste is involved or whether the conditions cause an increase or decrease in the Contractor's cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any completion date required by the Contract, but shall proceed with all Work to be performed under the Contract Documents.

H. The Contractor shall retain all rights provided by, and shall be subject to all requirements of, this Contract which pertain to the resolution of disputes and protests.

I. Contractor Responsibility. Except as otherwise provided in this Paragraph 10.03 for Differing Site Conditions, Contractor agrees to solely bear the risk of additional cost and Delay due to concealed or unknown conditions, surface or subsurface, at the Site or in Existing Improvements, without adjustment to the Contract Sum or Contract Time.

10.04 TRAFFIC REGULATION
A. During the performance of the Work the Contractor shall erect and maintain necessary temporary fences, bridges, railings, lights, signals, barriers, or other safeguards as shall be appropriate under the circumstance in his/her judgment for the prevention of accidents; and he/she shall take other precautions as necessary for public safety including, but not limited to, traffic control. Traffic control shall be conducted in accordance with the latest edition of the Work Area Traffic Control (“WATCH”) handbook, published by BNi Books, and as directed and approved by the City Traffic and Transportation Administrator.

B. Contractor shall submit at least ten (10) Working Days prior to Work a detailed traffic control plan, that is approved by all agencies having jurisdiction and that conforms to all requirements of the Specifications.

C. No changes or deviations from the approved detailed traffic control plan shall be made, except temporary changes in emergency situations, without prior approval of the City Traffic and Transportation Administrator and all agencies having jurisdiction.

Contractor shall immediately notify the Director, the City Traffic and Transportation Administrator and the agencies having jurisdiction of occurrences that necessitate modification of the approved traffic control plan.

D. Contractor’s failure to comply with this provision may result in actions as provided in Article 5:
“Suspension or Termination of Contract” of these General Conditions.

10.05 TRAFFIC CONTROL DEVICES
A. Traffic signs, flashing lights, barricades and other traffic safety devices used to control traffic shall

Page 73 of 133 ends

conform to the requirements of the WATCH handbook or the manual of traffic control, whichever is more stringent, and as approved by the City Traffic and Transportation Administrator.

1. Portable signals shall not be used unless permission is given in writing by the agency having jurisdiction.

2. Warning signs used for nighttime conditions shall be reflectorized or illuminated. "Reflectorized signs" shall have a reflectorized background and shall conform to the current State of California Department of Transportation specification for reflective sheeting on highway signs.

B. If the Contractor fails to provide and install any of the signs or traffic control devices required herby or ordered by the City staff, staff may cause such signs or traffic control devices to be placed by others, charge the costs therefore against the Contractor, and deduct the same from the next progress payment.

10.06 EXECUTION
A. The Contractor shall provide written notification to the Police Department, Traffic Bureau (323) 587- 5171, at least two (2) weeks prior to the beginning of construction at any particular location. Notification will include the specific location, project dates, what lanes of the roadway will be closed and when. Also the construction project manager’s name and business phone number and the construction inspector’s name and business phone number.

B. The Contractor shall notify, by telephone, the Police Department, (323) 587-5171 at the completion of any posting of temporary no parking signs. Notification will include the times, dates and locations of the posting. When vehicles must be towed for violation of temporary no parking signs, the person who actually posted the signs, or on-view supervisor of that posting, will be present to answer pertinent questions that may be asked by the parking enforcement officer or police officer towing the vehicles.

C. The Contractor shall notify the Fire Department, on a daily basis during the entire period that construction is in progress whenever roadways are reduced in width or blocked. Notification shall be made to the Fire Dispatch (323) 881-6183 and the Contractor shall provide the information required to identify which roadways would have accessibility problems due to his/her operations. The Contractor shall submit to Fire Department schedule of Work for their use and files.

D. Roads subject to interference from the Work covered by this Contract shall be kept open, and the fences subject to interference shall be kept up by the Contractor until the Work is finished. Except where public roads have been approved for closure, traffic shall be permitted to pass through designated traffic lanes with as little inconvenience and delay as possible.

E. Where alternating one-way traffic has been authorized, the maximum time that traffic will be delayed shall be posted at each end of the one-way traffic section. The maximum delay time shall be approved by the agency having jurisdiction.

F. Contractor shall install temporary traffic markings where required to direct the flow of traffic and shall maintain the traffic markings for the duration of need. Contractor shall remove the markings by abrasive blasting when no longer required.

G. Convenient access to driveways and buildings in the vicinity of Work shall be maintained as much as

Page 74 of 133 ends

possible. Temporary approaches to, and crossing of, intersecting traffic lanes shall be provided and kept in good condition.

H. When leaving a Work area and entering a roadway carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic.

10.07 FLAGGING
A. Contractor shall provide flaggers to control traffic where required by the approved traffic control plan.

1. Flaggers shall perform their duties and shall be provided with the necessary equipment in accordance with the current "Instructions to Flaggers" of the California Department of Transportation.

2. Flaggers shall be employed full time on traffic control and shall have no other duties.

10.08 PEDESTRIAN CANOPIES OR BARRICADE IMPROVEMENTS
Refer to City of Vernon for requirements for building or access road safety improvements that the Contractor shall construct during construction period. These devices or improvements, as the City deems necessary or prudent, shall be at the expense of the Contractor.
[END OF ARTICLE]

Page 75 of 133 ends

ARTICLE 11 - INDEMNITY

11.01 INDEMNITY
To the maximum extent permitted by law, the Contractor shall fully indemnify, hold harmless, protect, and defend the City, its officers, employees, agents, representatives and their successors and assigns (“Indemnitees”) from and against any and all demands, liability, loss, suit, claim, action, cause of action, damage, cost, judgment, settlement, decree, arbitration award, stop notice, penalty, loss of revenue, and expense (including any fees of accountants, attorneys, experts or other professionals, and costs of investigation, mediation, arbitration, litigation and appeal), in law or in equity, of every kind and nature whatsoever, arising out of or in connection with, resulting from or related to, or claimed to be arising out of the Work performed by Contractor, or any of its officers, agents, employees, Subcontractors, Sub-Subcontractors, design consultants or any person for whose acts any of them may be liable, regardless of whether such claim, suit or demand is caused, or alleged to be caused, in part, by an Indemnitee, including but not limited to:

A. Bodily injury, emotional injury, sickness or disease, or death to any persons; B. Infringement of any patent rights, licenses, copyrights or intellectual property which may be brought against the Contractor or City arising out of Contractor’s Work, for which the Contractor is responsible; C. Stop notices and claims for labor performed or materials used or furnished to be used in the Work, including all incidental or consequential damages resulting to City from such stop notices and claims; D. Failure of Contractor or its Subcontractors to comply with the provisions for insurance; E. Failure to comply with any Governmental Approval or similar authorization or order; F. Misrepresentation, misstatement, or omission with respect to any statement made in or any document furnished by the Contractor in connection therewith;
G. Breach of any duty, obligation, or requirement under the Contract Documents; H. Failure to provide notice to any Party as required under the Contract Documents; I. Failure to protect the property of any utility provider or adjacent property owner; or J. Failure to make payment of all employee benefits.

This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees, except that, to the limited extent mandated by California Civil Code Section 2782, the Contractor shall not be responsible for liabilities which arise from the sole negligence or willful misconduct of Indemnitees or arise from the active negligence of City.

11.02 ENFORCEMENT
Contractor’s obligations under this Article extend to claims occurring after termination of the Contractor’s performance of the Contract or Final Payment to Contractor. The obligations apply regardless of any actual or alleged negligent act or omission of Indemnitees. Contractor, however, shall not be obligated under this Agreement to indemnify an Indemnitee for claims arising from the sole active negligence or willful misconduct of the Indemnitee or independent contractors who are directly responsible to Indemnitees. Contractor’s obligations under this Article are in addition to any other rights or remedies which the Indemnitees may have under the law

Page 76 of 133 ends

or under the Contract Documents. In the event of any claim, suit or demand made against any Indemnitees, the City may in its sole discretion reserve, retain or apply any monies due to the Contractor under the Contract for the purpose of resolving such claims; provided, however, that the City may release such funds if the Contractor provides the City with reasonable assurance of protection of the City’s interests. The City shall in its sole discretion determine whether such assurances are reasonable.

11.03 NO LIMITATIONS
Contractor’s indemnification and defense obligations set forth in this Article are separate and independent from the insurance provisions set forth in Article 12 herein; and do not limit, in any way, the applicability, scope, or obligations set forth in those insurance provisions. In claims, suits, or demands against any Indemnitee by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them, or anyone for whose acts they may be liable, the Contractor’s indemnification and defense obligations shall not be limited by a limitation on amount or type of damages, compensation, or benefits payable by or for the Contractor or a Subcontractor under workers’ compensation acts, disability benefits acts, or other employee benefits acts. [END OF ARTICLE]

Page 77 of 133 ends

ARTICLE 12 – INSURANCE

12.01 CONDITION TO COMMENCEMENT
Contractor shall not commence Work under this Contract until Contractor has obtained all insurance required hereunder from a company or companies acceptable to City, nor shall the Contractor allow any Subcontractor to commence Work on a subcontract until all insurance required of said Subcontractor has been obtained. Proof of insurance including insurance certificates and endorsements as set forth in Exhibit 4 must be submitted by the Contractor prior to the City’s execution of the Contract.

12.02 MINIMUM COVERAGE AND LIMITS
Contractor shall maintain the insurance coverage as set forth in Exhibit 4 throughout the term of the Contract.

12.03 CONDITIONS REGARDING INSURANCE COVERAGE AND LIMITS City and Contractor agree as follows:

A. All insurance coverage and limits provided pursuant to the Contract Documents shall apply to the full extent of the policies involved, available or applicable. Nothing contained in the Contract Documents or any other agreement relating to City or its operations limits the application of such insurance coverage.

B. None of the policies required by this Contract shall be in compliance with these requirements if they include any limiting endorsement that has not been first submitted to City and approved in writing by the City’s Risk Manager.

12.04 INSURANCE OBLIGATION IS SEPARATE FROM INDEMNITY OBLIGATION This Agreement’s insurance provisions:

A. Are separate and independent from the indemnification and defense provisions in Article 12 of the Agreement; and
B. Do not limit, in any way, the applicability, scope, or obligations of the indemnification and defense provisions in Article 12 of the Agreement.
[END OF ARTICLE]

Page 78 of 133 ends

ARTICLE 13 – BONDS

13.01 REQUIRED BONDS
A. Contractor shall furnish the following bonds:

1. A Performance Bond in an amount equal to one hundred percent (100%) of the total Contract price in the form shown in Exhibit "1" attached hereto.

2. A Payment Bond (Labor and Material) in an amount equal to one hundred percent (100%) of the total Contract price in the form shown in Exhibit "2" attached hereto.

3. A Maintenance Bond in an amount equal to ten percent (10%) of the total Contract price in the form shown in Exhibit "3" attached hereto.

13.02 POWER OF ATTORNEY
All bonds shall be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California, all copies of the bonds must be countersigned by a California representative of the surety. The signature of the person executing the bond on behalf of Surety shall be acknowledged by a Notary Public as the signature of the person designated in the power of attorney.

13.03 APPROVED SURETY
All bonds must be issued by a California admitted surety insurer with the minimum A.M Best Company Financial strength rating of “A: VII”, or better. Bonds issued by a California admitted surety not listed on Treasury Circular 570 will be deemed accepted unless specifically rejected by the City. Bonds issued from admitted surety insurers not listed in Treasury Circular 570 must be accompanied by all documents enumerated in California Code of Civil Procedure Section 995.660. All such bonds must be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California, all copies of the bonds must be countersigned by a California representative of the surety. The signature of the person executing the bond on behalf of Surety must be acknowledged by a Notary Public as the signature of the person designated in the power of attorney.

13.04 REQUIRED PROVISIONS
Every bond must display the surety’s bond number and incorporate the Contract for construction of the Work by reference. The terms of the bonds shall provide that the surety agrees that no change, extension of time, alteration, or modification of the Contract Documents or the Work to be performed thereunder shall in any way affect its obligations and shall waive notice of any such change, extension of time, alteration, or modification of the Contract Documents.

13.05 NEW OR ADDITIONAL SURETIES
If, during the continuance of the Contract, any of the sureties, in the opinion of the City, are or become nonresponsible or otherwise unacceptable to City, City may require other new or additional sureties, which the Contractor shall furnish to the satisfaction of City within ten (10) days after notice, and in default thereof the Contract may be suspended and the materials may be purchased or the Work completed as provided in Article 5 herein.

Page 79 of 133 ends

13.06 WAIVER OF MODIFICATIONS AND ALTERATIONS
No modifications or alterations made in the Work to be performed under the Contract or the time of performance shall operate to release any surety from liability on any bond or bonds required to be given herein. Notice of such events shall be waived by the surety.

13.07 APPROVAL OF BONDS
The Contract will not be executed by City nor the Notice to Proceed issued until the required bonds have been received and approved by City. City's decision as to the acceptability of all sureties and bonds is final. No substitution of the form of the documents will be permitted without the prior written consent of City. [END OF ARTICLE]

Page 80 of 133 ends

ARTICLE 14 - LABOR PROVISIONS

14.01 WORKING HOURS
A. Work or activity of any kind shall be limited to the hours from 7:00 a.m. to 7:00 p.m. No construction noise shall be permitted between the hours of 7:00 p.m. and 7:00 a.m. of the next day.

B. Work in excess of eight (8) hours per day, on Saturdays, Sundays, or on City holidays requires prior consent of the Director and is subject to Cost of Overtime Construction Inspection.

C. Night, Sunday and Holiday Work. No Work shall be performed at night, Sunday, or the ten (10) legal holidays to wit: New Year’s Day, Martin Luther King, Jr. Day, President’s Day, Cesar Chavez Day, Memorial Day, Independence Day, Labor Day, Indigenous People’s Day, Veteran’s Day, Thanksgiving Day, Christmas Eve, Christmas Day and New Year’s Eve, except Work pertaining to the public safety or with the permission of the Director, and accordance with such regulations as he/she shall furnish in writing. Before performing any Work at said times, except Work pertaining to the public safety, the Contractor shall give written notice to the Director so that proper inspection may be provided. “Night” as used in this paragraph shall be deemed to include the hours from 7:00 P.M. to 7:00 A.M. of the next succeeding day.

14.02 COST OF OVERTIME CONSTRUCTION SERVICES AND INSPECTIONS A. Overtime construction Work performed at the option of, or for the convenience of, the Contractor will be inspected by the City at the expense of the Contractor. For any such overtime beyond the regular 8-hour day and for any time worked on Saturday, Sunday, or holidays the charges will be determined by the City, and submitted to the Contractor for payment.

B. Equipment, materials, or services provided by the City, in connection with Contractor-initiated overtime construction Work described in Paragraph 14.02(A), will also be at the expense of the Contractor. The charges will be determined by the City, and submitted to the Contractor for payment.

C. There will be no charges to the Contractor for the inspection of overtime Work ordered by the Director or required by the Contract Documents.

14.03 COMPLIANCE WITH STATE LABOR CODE
A. Contractor shall comply with the provisions of the Labor Code of the State of California and any amendments thereof.

1. The time of service of any worker employed upon the Work shall be limited and restricted to eight (8) hours during any one-calendar day, and 40 hours during any one-calendar week.

2. Work performed by employees of the Contractor in excess of eight (8) hours per day, and 40 hours during any one calendar week, shall be permitted upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half times the basic rate of pay.

3. The Contractor and every Subcontractor shall keep an accurate record showing the name of and the actual hours worked each calendar day and each calendar week by each worker employed by him/her in connection with the Work; the record shall be kept open at all reasonable hours to the inspection of the City and to the Division of Labor Standards Enforcement of the State of California.

Page 81 of 133 ends

4. In the event City deems Contractor is in violation of this Paragraph 14.03, the Contractor shall, as a penalty, forfeit Fifty Dollars ($50.00) for each worker employed in the execution of the Contract by the Contractor or by any Subcontractor for each calendar day for which the employee was underpaid in addition to an amount sufficient to recover underpaid wages. For each subsequent violation, a (one hundred dollar) $100 penalty shall apply for each underpaid employee for each pay period for which the employee was underpaid in addition to an amount sufficient to cover underpaid wages. This subparagraph is effective to the extent it does not directly conflict with the overtime penalty provision of California Labor Code Section 558. In the event of such conflict, the California Labor Code governs over this Paragraph 14.03(A)(4).

14.04 WAGE RATES
A. Prevailing Wages

1. Contractor shall comply with the general prevailing rates of per diem wages and the general prevailing rates for holiday and overtime Work in the locality in which the Work is to be performed, for each craft, classification, or type of worker needed to execute the Contract. The Director of the Department of Industrial Relations of the State of California (pursuant to California Labor Code) and the United States Secretary of Labor (pursuant to the Davis-Bacon Act) have determined the general prevailing rates of wages in the locality in which the Work is to be performed. The rates are available online at www.dir.ca.gov/DLSR/PWD/. To the extent that there are any differences in the federal and state prevailing wage rates for similar classifications of labor, the Contractor and its Subcontractors shall pay the highest wage rate.

2. The Contractor shall post a copy of the general prevailing rate of per diem wages at the job site.

3. The Contractor and any Subcontractor under him/her shall pay not less than the specified prevailing rate of wages to all workers employed in the execution of the Contract.

4. The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining Contract applicable to the particular craft, classification, or type of worker employed on the project.

5. The Contractor shall, as a penalty to the State or the City, forfeit not more than Fifty Dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates for the Work or craft in which the worker is employed under the Contract by the Contractor or by any Subcontractor under him. The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which such worker was paid less than the stipulated prevailing wage rate shall be paid to such worker by the Contractor.

6. The specified wage rates are minimum rates only and the City will not consider and shall not be liable for any claims for additional compensation made by the Contractor because of payment by him/her of any wage rate in excess of the general prevailing rates. All disputes in regard to the payment of wages in excess of those specified herein shall be adjusted by the Contractor at his/her own expense.

B. Payroll Records

1. Pursuant to California Labor Code Section 1776, the Contractor and each Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, Work classification, straight time and overtime hours worked each day and week, and the actual per

Page 82 of 133 ends

diem wages paid to each journeyman, apprentice, worker or other employee employed in connection with the Work. The payroll records shall be certified and shall be available for inspection.

2. The Contractor shall inform the City of the location of the payroll records, including the street address, city and county, and shall, within five (5) Working Days, provide a notice of change in location and address.

3. Upon request by the Director, the Contractor shall provide a copy of the certified payroll records along with a statement of compliance.

14.05 APPRENTICESHIP STANDARDS
A. Compliance with California Labor Code Section 1777.5 requires all public works contractors and subcontractors to:

1. Prior to commencing work on a public works contract, submit Contract Award information to the applicable joint apprenticeship committee, including an estimate of the journeyman hours to be performed under the Contract, the number of apprentices to be employed, and the approximate dates the apprentices will be employed. Use Form DAS-140 from the State Department of Industrial Relations. The City reserves the right to require Contractor and Subcontractors to submit a copy of said forms to the City.

2. Employ apprentices for the public work at a ratio of no less than one (1) hour or apprentice work for every five (5) hours or labor performed by a journeyman. To request dispatch of apprentices, use Form DAS-142 from the State Department of Industrial Relations. The City reserves the right to require Contractor and Subcontractors to submit a copy of said forms to the City.

3. Pay the apprentice rate on public works projects only to those apprentices who are registered, as defined in Labor Code Section 3077.

4. Contribute to the training fund in the amount identified in the Prevailing Wage Rate publication for journeyman and apprentices. Contractors who choose not to contribute to the local training trust fund must make their contributions to the California Apprenticeship Council, P.O. Box 420603, San Francisco, CA 94142.

B. Failure to comply with the provisions of California Labor Code Section 1777.5 may result in the loss of the right to bid or perform work on all public works projects for a period of one to three years and the imposition of a civil penalty of One Hundred Dollars ($100.00) for each calendar day of noncompliance for the first violation and up to Three Hundred Dollars ($300.00) for each calendar day of noncompliance for a second or subsequent violation. Contractor should make a separate copy of this material for each of his/her Subcontractors.

C. Payroll Records. The Contractor and each Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman apprentice, worker or other employee employed in connection with the work. The payroll records shall be certified and shall be submitted to the Project Manager every two weeks.

Page 83 of 133 ends

D. Statement of Employer Fringe Benefit Payments. Within five (5) calendar days of signing the Contract or Subcontract, as applicable, the Statement of Employer Payments (DLSE Form PW 26 from the State Department of Industrial Relations) shall be completed for each Contractor and Subcontractor of any tier who pays benefits to a third party trust, plan or fund for health and welfare benefits, vacation funds or makes pension contributions. The form must contain, for each worker classification, the fund, plan or trust name, address, administrator, the amount per hour contributed and the frequency of contributions. Training fund contributions shall also be reported in this form.

City reserves the right to require Contractors and Subcontractors to submit a copy of said forms to the City.

14.06 EMPLOYMENT OF APPRENTICES
A. In the performance of this Contract, the Contractor and any Subcontractor shall comply with the provisions concerning the employment of apprentices in the Labor Code of the State of California and any amendments thereof.

B. In the event the Contractor or any Subcontractor willfully fails to comply with the aforesaid provisions of the Labor Code, such Contractor or Subcontractor shall be subject to the penalties for noncompliance in the Labor Code of the State of California and any amendments thereof.

14.07 REGISTRATION WITH THE STATE DEPARTMENT OF INDUSTRIAL RELATIONS In the performance of this Contract, Contractor and/or any Subcontractor must be currently registered and qualified (including payment of any required fee) with the State Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the State Department of Industrial Relations.

14.08 CHARACTER OF WORKERS
The Contractor shall not allow his/her agents or employees, Subcontractors, or any agent or employee thereof, to trespass on premises or lands in the vicinity of the Work. Only skilled foremen and workers shall be employed on Work requiring special qualifications, and when required by the Director, the Contractor shall discharge any person who commits trespass, or in the opinion of the Director, acts in a disorderly, dangerous, insubordinate, incompetent, or otherwise objectionable manner. Any employee being intoxicated or bringing or having intoxicating liquors or controlled substances on the Work shall be discharged. Such discharge shall not be the basis of any claim for compensation of damages against the City or any of its officers, agents, and employees.

14.09 NO SMOKING – STATE LABOR CODE SECTION 6404.5
The Contractor and its agents, employees, Subcontractors, representatives, and any person under Contractor’s control, are prohibited from smoking in— or within a 20-foot distance from— the Site, which is a "place of employment" under California Labor Code § 6404.5. [END OF ARTICLE]

Page 84 of 133 ends

ARTICLE 15 - DISPUTE RESOLUTION

15.01 SUBMISSION OF CLAIMS
A. By Contractor
Contractor’s right to commence the Claims Dispute Resolution Process shall arise upon the Director’s written response denying all or part of a Claim. Contractor shall submit a written Statement of Dispute to the Director within seven (7) Days after the Director rejects all or a portion of Contractor’s Claim.

Contractor’s Statement of Dispute shall be signed under penalty of perjury and shall state with specificity the events or circumstances giving rise to the Claim, the dates of their occurrence and the effect, if any, on the compensation due or performance obligations of Contractor under the Construction Contract. Such Statement of Dispute shall include adequate supporting data to substantiate the disputed Claim. Adequate supporting data for a Claim relating to the adjustment of the Contractor’s obligations relative to time of performance shall include a detailed, event-by-event description of the impact of each delay on Contractor’s time for performance. Adequate supporting data to a Statement of Dispute submitted by Contractor involving Contractor’s compensation shall include a detailed cost breakdown and supporting cost data in such form and including such detailed information and other supporting data as required to demonstrate the grounds for, and precise amount of, the Claim.

B. By City
City’s right to commence the Claims Dispute Resolution Process shall arise at any time following the City’s actual discovery of the circumstances giving rise to the Claim. Nothing contained herein shall preclude City from asserting Claims in response to a Claim asserted by Contractor. A Statement of Dispute submitted by City shall state the events or circumstances giving rise to the Claim, the dates of their occurrence and the damages or other relief claimed by City as a result of such events.

C. Claims Defined
The term “claims” as used herein shall be as defined in California Public Contract Code § 20104(b)(2).

15.02 CLAIMS DISPUTE RESOLUTION PROCESS
The parties shall utilize each of the following steps in the Claims Dispute Resolution Process in the sequence they appear below. Each party shall participate fully and in good faith in each step in the Claims Dispute Resolution Process, which good faith effort shall be a condition precedent to the right of each party to proceed to the next step in the Claims Dispute Resolution Process.

A. Direct Negotiations
Designated representatives of City and Contractor shall meet as soon as possible (but not later than ten (10) Days after receipt of the Statement of Dispute) in a good faith effort to negotiate a resolution to the Claim. Each party shall be represented in such negotiations by an authorized representative with full knowledge of the details of the Claim or defenses being asserted by such party, and with full authority to resolve such Claim then and there, subject only to City’s right and obligation to obtain City Council [or other City official] approval of any agreed settlement or resolution. In the Claim involves the assertion of a right or claim by a Subcontractor against Contractor that is in turn being asserted by Contractor against City, then such Subcontractor shall also have a representative attend such negotiations, with the same authority and knowledge as just described. Upon completion of the meeting, if the Claim is not resolved, the parties may either continue the negotiations or either party

Page 85 of 133 ends

may declare negotiations ended. All discussions that occur during such negotiations and all documents prepared solely for the purpose of such negotiations shall be confidential and privileged pursuant to California Evidence Code Sections 1119 and 1152.

B. Deferral of Claims
Following the completion of the negotiations required by Paragraph 15.02-A., all unresolved Claims, except those that do not involve parties other than the Contractor and City, shall be deferred pending Final Completion of the Work, subject to City’s right, in its sole and absolute discretion, to require that the claims Dispute Resolution Process proceed prior to Final Completion. In the event that City does not elect to proceed with the Claims Dispute Resolution Process prior to Final Completion of the Work, all Claims that have been deferred until such Final Completion shall be consolidated within a reasonable time after such Final Completion and thereafter pursued to resolution pursuant to the Claims Dispute Resolution Process. Nothing contained in this Article 15 shall be interpreted as limiting the parties’ rights to continue informal negotiations of Claims that have been deferred until such Final Completion; provided, however, that such informal negotiations shall not be interpreted as altering the provisions of this Article 15 deferring final determination and resolution of unresolved Claims until after Final Completion of the Work.

C. Legal Proceedings
If the Claim is not resolved by direct negotiations then the party wishing to further pursue resolution or determination of the Claim shall submit the Claim for determination by commencing legal proceedings in a court of competent jurisdiction.

15.03 NO WAIVER
Participation in the Claims Dispute Resolution Process shall not constitute a waiver, release or compromise of any defense of either party, including, without limitation, any defense based on the assertion that the rights of Contractor that are the basis of a Claim were previously waived by Contractor due to failure to comply with the Contract Documents, including, without limitation, Contractor’s failure to comply with any time periods for providing notices or for submission or supporting documentation of Claims. [END OF ARTICLE]

Page 86 of 133 ends

ARTICLE 16 - ACCOUNTING RECORDS

16.01 MAINTENANCE OF RECORDS
Contractor shall keep, and shall include in its contracts with its Subcontractors, provisions requiring its Subcontractors to keep full and detailed books and records in accordance with the requirements of the Contract Documents, including the following: all information, materials and data of every kind and character (hard copy, as well as computer readable data if it exists), that have any bearing on or pertain to any matters, rights, duties or obligations relating to the Project or the performance of the Work, including, without limitation, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, change orders, change order requests, estimates, field orders, schedules, diaries, logs, reports, shop drawings, samples, exemplars, Drawings, Specifications, invoices, delivery tickets, receipts, vouchers, cancelled checks, memoranda; accounting records; job cost reports; job cost files (including complete documentation covering negotiated settlements); backcharge; general ledgers; documentation of cash and trade discounts earned; insurance rebates and dividends, and other documents relating in way to Claims or Change Orders, Construction Change Directives, Work Directives, or other claims for payment related to the Project asserted by Contractor or any Subcontractor (“Accounting Records”). Contractor shall exercise such controls as may be necessary for proper financial management of the Work. Such accounting and control systems shall comply with prevailing custom and practice for similar projects, be satisfactory to City and shall include preservation of such records for a period of five (5) years after approval of the Notice of Completion and Acceptance by City, or for such longer period as may be required by applicable laws.

16.02 ACCESS TO RECORDS
Contractor shall allow, and shall include in its contracts with its Subcontractors provisions requiring its Subcontractors to allow, City and its authorized representative(s), auditors, attorneys and accountants, upon twenty-four (24) hours notice to Contractor, full access to inspect and copy all books and records relating to the Project that Contractor is required to maintain pursuant to Paragraph 16.01, above.

16.03 CONTRACTOR NONCOMPLIANCE, WITHHOLDING
Contractor's compliance with Paragraphs 16.01 and 16.02, above, shall be a condition precedent to maintenance of any legal action or arbitration by Contractor against City. In addition to and without limitation upon City's other rights and remedies for breach, including any other provisions for withholding set forth in the Contract Documents, City shall have the right, exercised in its sole discretion, to withhold from any payment to Contractor due under a current Application for Payment an additional sum of up to ten percent (10%) of the total amount set forth in such Application for Payment, until Contractor and its Subcontractors have complied with any outstanding and unsatisfied request by City under this Article 16. Upon such compliance with this Article 16, any additional monies withheld pursuant to this Paragraph 16.03 shall be released to Contractor.

16.04 SPECIFIC ENFORCEMENT BY CITY
Contractor agrees that any failure by Contractor or any Subcontractor to provide access to its books and records as required by this Article 16 shall be specifically enforceable, by issuance of a preliminary and/or permanent mandatory injunction by a court of competent jurisdiction based on affidavits submitted to such court and without the necessity of oral testimony, to compel Contractor to permit access, inspection, audits and/or reproduction of such books and records or to require delivery of such books and records to City for inspection, audit and/or reproduction.
[END OF ARTICLE]

Page 87 of 133 ends

ARTICLE 17-MISCELLANEOUS PROVISIONS

17.01 COMPLIANCE WITH APPLICABLE LAWS
A. Notices, Compliance
Contractor shall give all notices required by governmental authorities and comply with all applicable laws and lawful orders of governmental authorities, including but not limited to the provisions of the California Code of Regulations applicable to contractors performing construction and all laws, ordinances, rules, regulations and lawful orders relating to safety, prevailing wage and equal employment opportunities.

B. Taxes, Employee Benefits
Contractor shall pay at its own expense, at no cost to the City and without adjustment to the Contract Sum, all local, state and federal taxes, including, without limitation all sales, consumer, business license, use and similar taxes on materials, labor or other items furnished for the Work or portions thereof provided by Contractor or Subcontractors, all taxes arising out of its operations under the Contract Documents and all benefits, insurance, taxes and contributions for social security and unemployment insurance which are measured by wages, salaries or other remuneration paid to Contractor's employees. If under federal excise tax law any transaction hereunder constitutes a sale on which a federal excise tax is imposed and the sale is exempt from such excise tax because it is a sale to meat for its exclusive use, then City, upon request, will execute documents necessary to show that is a political subdivision of the State for the purposes of such exemption and that the sale is for the exclusive use of the City, in which case no excise tax for such materials shall be included in the Bid or Contract Sum.

C. Notice of Violations
Contractor shall immediately notify the City and Director in writing of any instruction received from the City, Director, Architect or other person or entity that, if implemented, would cause a violation of any applicable law or lawful order of a governmental authority. If Contractor fails to provide such notice, then Director shall be entitled to assume that such instruction is in compliance with applicable laws and lawful orders of governmental authorities. If Contractor observes that any portion of the Drawings and Specifications or Work are at variance with applicable laws or lawful orders of governmental authorities, or should Contractor become aware of conditions not covered by the Contract Documents which will result in Work being at variance therewith, Contractor shall promptly notify Director in writing. If, without such notice to Director, Contractor or any Subcontractor performs any Work which it knew, or through the exercise of reasonable care should have known, was contrary to lawful orders of governmental authorities or applicable laws, then Contractor shall bear all resulting losses at its own expense, at no cost to City and without adjustment to the Contract Sum.

17.02 OWNERSHIP OF DESIGN DOCUMENTS
A. Property of City
All Design Documents, Contract Documents and Submittals (including, without limitation, all copies thereof) and all designs and building designs depicted therein are and shall remain the sole and exclusive property of the City and the City shall solely and exclusively hold all copyrights thereto.

Without derogation the City’s rights under this Paragraph, the Contractor and Subcontractors are

Page 88 of 133 ends

granted a limited, non-exclusive license, revocable at will of City, to use and reproduce applicable portions of the Contract Documents and Submittals as appropriate to and for use in the execution of the Work and for no other purpose.

B. Documents on Site
Contractor shall keep on the Project site, at all times and for use by City, Director, Inspectors of Record and City’s Consultants, a complete set of the Contract Documents that have been approved by applicable Governmental Authorities.

C. Delivery to City
All Design Documents, Contract Documents and Submittals in the possession of Contractor or Subcontractors shall be returned to the City upon the earlier of Final Completion or termination of the Construction Contract; provided, however, that Contractor and each Subcontractor shall have the right to retain one (1) copy of the Contract Documents and Submittals for its permanent records D. Subcontractors
Contractor shall take all necessary steps to assure that a provision is included in all subcontracts with Subcontractors, of every tier, who perform Work on the Project establishing, protecting and preserving the, City’s rights set forth in this Paragraph.

17.03 AMENDMENTS
The Contract Documents may be amended only by a written instrument duly executed by the parties or their respective successors or assigns.

17.04 WAIVER
Either party's waiver of any breach or failure to enforce any of the terms, covenants, conditions or other provisions of the Contract Documents at any time shall not in any way limit or waive that party's right thereafter to enforce or compel strict compliance with every term, covenant, condition or other provision, any course of dealing or custom of the trade notwithstanding. Furthermore, if the parties make and implement any interpretation of the Contract Documents without documenting such interpretation by an instrument in writing signed by both parties, such interpretation and implementation thereof will not be binding in the event of any future disputes.

17.05 INDEPENDENT CONTRACTOR
Contractor is an independent contractor, and nothing contained in the Contract Documents shall be construed as constituting any relationship with City other than that of Project owner and independent contractor. In no event shall the relationship between City and Contractor be construed as creating any relationship whatsoever between City and Contractor's employees. Neither Contractor nor any of its employees is or shall be deemed to be an employee of City. Except as otherwise specified in the Contract Documents, Contractor has sole authority and responsibility to employ, discharge and otherwise control its employees and has complete and sole responsibility as a principal for its agents, for all Subcontractors and for all other Persons that Contractor or any Subcontractor hires to perform or assist in performing the Work.

Page 89 of 133 ends

17.06 SUCCESSORS AND ASSIGNS
The Contract Documents shall be binding upon and inure to the benefit of City and Contractor and their permitted successors, assigns and legal representatives.

A. City may assign all or part of its right, title and interest in and to any Contract Documents, including rights with respect to the Payment and Performance Bonds, to (a) any other governmental person as permitted by governmental rules, provided that the successor or assignee has assumed all of City's obligations, duties and liabilities under the Contract Document then in effect; and (b) any other Person with the prior written approval of Contractor.

B. Contractor may collaterally assign its rights to receive payment under the Contract Documents.

Contractor may not delegate any of its duties hereunder, except to Subcontractors as expressly otherwise permitted in the Contract Documents. Contractor's assignment or delegation of any of its Work under the Contract Documents shall be ineffective to relieve Contractor of its responsibility for the Work assigned or delegated, unless City, in its sole discretion, has approved such relief from responsibility.

Any assignment of money shall be subject to all proper set-offs and withholdings in favor of City and to all deductions provided for in the Contract. All money withheld, whether assigned or not, shall be subject to being used by City for completion of the Work, should Contractor be in default.

C. Except for the limited circumstances set forth in Paragraph 17.06-B, above, Contractor may not, without the prior written consent of City in its sole discretion, voluntarily or involuntarily assign, convey, transfer, pledge, mortgage or otherwise encumber its rights or interests under the Contract Documents. No partner, joint venturer, member or shareholder of Contractor may assign, convey, transfer, pledge, mortgage or otherwise encumber its ownership interest in Contractor without the prior written consent of City, in City’s sole discretion.

17.07 SURVIVAL
Contractor’s representations and warranties, the dispute resolution provisions contained in Article 15, and all other provisions which by their inherent character should survive termination of the Contract and/or Final Acceptance, shall survive the termination of the Contract and the Final Acceptance Date.

17.08 LIMITATION ON THIRD PARTY BENEFICIARIES
It is not intended by any of the provisions of the Contract Documents to create any third party beneficiary hereunder or to authorize anyone not a party hereto to maintain a suit for personal injury or property damage pursuant to the terms or provisions hereof, except to the extent that specific provisions (such as the warranty and indemnity provisions) identify third parties and state that they are entitled to benefits hereunder. The duties, obligations and responsibilities of the parties to the Contract Documents with respect to such third parties shall remain as imposed by law. The Contract Documents shall not be construed to create a contractual relationship of any kind between City and a Subcontractor or any other Person except Contractor.

17.09 PERSONAL LIABILITY OF CITY EMPLOYEES
City’s authorized representatives are acting solely as agents and representatives of City when carrying out the provisions of or exercising the power or authority granted to them under the Contract. They shall not be liable either personally or as employees of City for actions in their ordinary course of employment.

Page 90 of 133 ends

No agent, consultant, Council member, officer or authorized employee of City, shall be personally responsible for any liability arising under the Contract.

17.10 NO ESTOPPEL
City shall not, nor shall any officer thereof, be precluded or estopped by any measurement, estimate or certificate made or given by the City representative or other officer, agent, or employee of City under any provisions of the Contract from at any time (either before or after the final completion and acceptance of the Work and payment therefor) pursuant to any such measurement, estimate or certificate showing the true and correct amount and character of the work done, and materials furnished by Contractor or any person under the Contract or from showing at any time that any such measurement, estimate or certificate is untrue and incorrect, or improperly made in any particular, or that the work and materials, or any part thereof, do not in fact conform to the Contract Documents. Notwithstanding any such measurement, estimate or certificate, or payment made in accordance therewith, City shall not be precluded or estopped from recovering from Contractor and its Sureties such damages as City may sustain by reason of Contractor’s failure to comply or to have complied with the Contract Documents.

17.11 GOVERNING LAW
The laws of the State of California govern the construction and interpretation of the Contract Documents, without regard to conflict of law principles. Unless the Contract Documents provide otherwise, any reference to laws, ordinances, rules, or regulations include their later amendment, modifications, and successor legislation. If Contractor or City brings a lawsuit to enforce or interpret one or more provisions of the Contract Documents, jurisdiction is in the Superior Court of the County of Los Angeles, California, or where otherwise appropriate, in the United States District Court, Central District of California. Contractor and City acknowledge that the Contract Documents were negotiated, entered into, and executed—and the Work was performed—in the City of Vernon, California.

17.12 FURTHER ASSURANCES
Contractor shall promptly execute and deliver to City all such instruments and other documents and assurances as are reasonably requested by City to further evidence the obligations of Contractor hereunder, including assurances regarding assignments of Subcontractors contained herein.

17.13 SEVERABILITY
If any clause, provision, section, paragraph or part of the Contract is ruled invalid by a court having proper jurisdiction, then the parties shall: (a) promptly meet and negotiate a substitute for such clause, provision, section, paragraph or part, which shall, to the greatest extent legally permissible, effect the original intent of the parties, including an equitable adjustment to the Contract Price to account for any change in the Work resulting from such invalidated portion; and (b) if necessary or desirable, apply to the court or other decision maker (as applicable) which declared such invalidity for an interpretation of the invalidated portion to guide the negotiations. The invalidity or unenforceability of any such clause, provision, section, paragraph or part shall not affect the validity or enforceability of the balance of the Contract, which shall be construed and enforced as if the Contract did not contain such invalid or unenforceable clause, provision, section, paragraph or part.

Page 91 of 133 ends

17.14 HEADINGS
The captions of the sections of the Contract are for convenience only and shall not be deemed part of the Contract or considered in construing the Contract.

17.15 ENTIRE AGREEMENT
The Contract Documents contain the entire understanding of the parties with respect to the subject matter hereof and supersede all prior agreements, understandings, statements, representations and negotiations between the parties with respect to its subject matter.

17.16 COUNTERPARTS
This instrument may be executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. [END OF ARTICLE]

Page 92 of 133 ends

EXHIBIT 1 Bond No.:

Premium Amount: $
Bond’s Effective Date:

PERFORMANCE BOND
RECITALS:

1. The City of Vernon, California (“City”), has awarded to

(Name, address, and telephone of Contractor)
________________________________________________________________________________ (“Principal”), a Contact (the “Contract) for the Work described as
follows:

Specification No. : in Vernon, CA.

2. Principal is required under the terms of the Contract and all contract documents referenced in it (“Contract Documents”) to furnish a bond guaranteeing Principal’s faithful performance of the Work.

3. The Contract and Contract Documents, including all their amendments and supplements, are incorporated into this Bond and made a part of it by this reference.

OBLIGATION:

THEREFORE, for value received, We, Principal and
______________________________________________________________________________________________ (Name, address, and telephone of Surety)
______________________________________________________________________________________ (“Surety”), a duly admitted surety insurer under California’s laws, agree as follows:

By this Bond, We jointly and severally obligate and bind ourselves, and our respective heirs, executors, administrators, successors, and assigns to pay City the penal sum of
Dollars ($ ) (“the Bonded Sum”), this amount
comprising not less than the total Contract Sum, in lawful money of the United States of America.

The Licensed Agent for Surety is:

(Name, address, and telephone)
Registered Agent’s California Department of Insurance License No. .

THE CONDITION OF THIS BOND’S OBLIGATION IS THAT, if Principal promptly and faithfully performs the undertakings, terms, covenants, conditions, and agreements in the Contract and Contract Documents (including all their amendments and supplements), all within the time and in the manner that those documents specify, then this obligation becomes null and void. Otherwise, this Bond remains in full force and effect, and the following terms and conditions apply to this Bond:

1. This Bond specifically guarantees Principal’s performance of each obligation and all obligations under the Contract and Contract Documents, as they may be amended and supplemented including, but not limited to, Principal’s liability for liquidated damages, Warranties, Guarantees, Correction, and Maintenance obligations as specified in the Contract and Contract

Page 93 of 133 ends

Documents except that Surety’s total obligation, as described here, will not exceed the Bonded Sum.

Page 94 of 133 ends

2. For those obligations of Principal that survive Final Completion of the Work described in the Contract and Contract Documents, the guarantees in this Bond also survive Final Completion of the Work.

3. When City declares that Principal is in default under the Contract, or Contract Documents, or both, Surety shall promptly: (a) remedy the default; (b) complete the Project according to the Contract Documents’ terms and conditions then in effect; or (c) using a procurement methodology approved by City, select a contractor or contractors acceptable to City to complete all of the Work, and arrange for a contract between the contractor(s) and City. Surety shall make available, as the Work progresses, sufficient funds to pay the cost of completion less the balance of the Contract Sum, and to pay and perform all obligations of Principal under the Contract and Contract Documents including other costs and damages for which Surety is liable under this Bond except that Surety’s total obligation, as described here, will not exceed the Bonded Sum.

4. An alteration, modification, change, addition, deletion, omission, agreement, or supplement to the Contract, Contract Documents, or the nature of the Work performed under the Contract or Contract Documents including, without limitation, an extension of time for performance does not, in any way, affect Surety’s obligations under this Bond. Surety waives any notice of alteration, modification, change, addition, deletion, omission, agreement, supplement, or extension of time.

5. Surety’s obligations under this Bond are separate, independent from, and not contingent upon any other surety’s guaranteeing Principal’s faithful performance of the Work.

6. No right of action accrues on this Bond to any entity other than City or its successors and assigns.

7. If an action at law or in equity is necessary to enforce or interpret this Bond’s terms, Surety must pay in addition to the Bonded Sum City’s reasonable attorneys’ fees and litigation costs, in an amount the court fixes.

8. Surety shall mail City written notice at least 30 days before: (a) the effective date on which the Surety will cancel, terminate, or withdraw from this Bond; or (b) this Bond becomes void or unenforceable for any reason. [Signatures to this Exhibit 1, Performance Bond, Begin on Next Page].

Page 95 of 133 ends

On the date set forth below, Principal and Surety duly executed this Performance Bond, with the name of each party appearing below and signed by its representative(s) under the authority of its governing body.

Date:

PRINCIPAL: SURETY:

(Company Name) (Company Name)

(Signature) (Signature)
By: By:
(Name and Title) (Name and Title)
Address for Serving Notices or Other Documents: Address for Serving Notices or Other Documents:

 THIS BOND MUST BE EXECUTED IN TRIPLICATE.
 EVIDENCE MUST BE ATTACHED OF THE AUTHORITY OF ANY PERSON SIGNING AS ATTORNEY-IN-FACT.  THE ATTORNEY-IN-FACT’S SIGNATURE MUST BE NOTARIZED.
 A CORPORATE SEAL MUST BE IMPRESSED ON THIS FORM WHEN THE PRINCIPAL, OR THE SURETY, OR BOTH, ARE A CORPORATION.

APPROVED AS TO SURETY AND APPROVED AS TO FORM:

AMOUNT OF BONDED SUM:

By: By:

Daniel Wall, Director of Public Works Zaynah N. Moussa, City Attorney

CORPORATE SEAL CORPORATE SEAL CORPORATE SEAL

Page 96 of 133 ends

BOND ACKNOWLEDGMENT
FOR
SURETY’S ATTORNEY-IN-FACT

STATE OF CALIFORNIA )
) ss

COUNTY OF )
On this day of , 20 ,
before me, (name), a Notary Public for said County, personally appeared (name), who proved to me on the basis of
satisfactory evidence to be the person whose name is subscribed to this instrument as the attorney in fact of , and acknowledged to me that he/she subscribed the
name of thereto as principal, and his/he own name as
attorney in fact.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Notary Public
SEAL

Page 97 of 133 ends

EXHIBIT 2 Bond No.:

Premium Amount: $
Bond’s Effective Date:

PAYMENT BOND
(LABOR AND MATERIALS)
RECITALS:

1. The City of Vernon, California (“City”), has awarded to __________________________________________________________________________________________ (Name, address, and telephone of Design-Builder)
________________________________________________________________________________ (“Principal”), a Contract (the “Contract”) for the Work described as
follows:

Specification No. : in Vernon, CA.

2. Principal is required under California Civil Code Sections 9550-9566 and the terms of the Contract and all contract documents referenced in it (“Contract Documents”) to furnish a bond guaranteeing Principal’s paying claims, demands, liens, or suits for any work, labor, services, materials, or equipment furnished or used in the Work.

3. The Contract and Contract Documents, including all their amendments and supplements, are incorporated into this Bond and made a part of it by this reference.

OBLIGATION:

THEREFORE, for value received, We, Principal and
______________________________________________________________________________________________ (Name, address, and telephone of Surety)
______________________________________________________________________________________ (“Surety”), a duly admitted surety insurer under California’s laws, agree as follows:

By this Bond, We jointly and severally obligate and bind ourselves, and our respective heirs, executors, administrators, successors, and assigns to pay City the penal sum of
Dollars ($ ) (“the Bonded Sum”), this amount
comprising not less than the total Contract Sum, in lawful money of the United States of America.

The Licensed Agent for Surety is:

(Name, address, and telephone)
Registered Agent’s California Department of Insurance License No. .

THE CONDITION OF THIS BOND’S OBLIGATION IS THAT, if Principal or a subcontractor fails to pay (a) any person named in California Civil Code Section 9100, or any successor legislation; (b) any amount due under California’s Unemployment Insurance Code, or any successor legislation, for work or labor performed under the Contract or Contract Documents; or (c) any amount under Unemployment Insurance Code Section 13020, or any successor legislation, that Principal or a subcontractor must deduct, withhold, and pay over to the Employment Development Department from the wages of its employees, for work or labor performed under the Contract or Contract Documents, then Surety shall pay for the same in an amount not-to-exceed the Bonded Sum.

Otherwise, this obligation becomes null and void. While this Bond remains in full force and effect, the following terms and conditions apply to this Bond:

Page 98 of 133 ends

1. This Bond inures to the benefit of any of the persons named in California Civil Code Section 3181, or any successor legislation, giving those persons or their assigns a right of action in any suit brought upon this Bond, unless California Civil Code Section 3267, or any successor legislation, applies.

2. An alteration, modification, change, addition, deletion, omission, agreement, or supplement to the Contract, Contract Documents, or the nature of the Work performed under the Contract or Contract Documents including, without limitation, an extension of time for performance does not, in any way, affect Surety’s obligations under this Bond. Surety waives any notice of alteration, modification, change, addition, deletion, omission, agreement, supplement, or extension of time.

3. Surety’s obligations under this Bond are separate, independent from, and not contingent upon any other surety’s paying claims, demands, liens, or suits for any work, labor, services, materials, or equipment furnished or used in the Work.

4. If an action at law or in equity is necessary to enforce or interpret this Bond’s terms, Surety must pay in addition to the Bonded Sum City’s reasonable attorneys’ fees and litigation costs, in an amount the court fixes.

5. Surety shall mail City written notice at least 30 days before: (a) the effective date on which the Surety will cancel, terminate, or withdraw from this Bond; or (b) this Bond becomes void or unenforceable for any reason. [Signatures to this Exhibit 2, Payment Bond, Begin on Next Page].

Page 99 of 133 ends

On the date set forth below, Principal and Surety duly executed this Payment Bond, with the name of each party appearing below and signed by its representative(s) under the authority of its governing body.

Date:

PRINCIPAL: SURETY:

(Company Name) (Company Name)

(Signature) (Signature)
By: By:
(Name and Title) (Name and Title)
Address for Serving Notices or Other Documents: Address for Serving Notices or Other Documents:

 THIS BOND MUST BE EXECUTED IN TRIPLICATE.
 EVIDENCE MUST BE ATTACHED OF THE AUTHORITY OF ANY PERSON SIGNING AS ATTORNEY-IN-FACT.  THE ATTORNEY-IN-FACT’S SIGNATURE MUST BE NOTARIZED.
 A CORPORATE SEAL MUST BE IMPRESSED ON THIS FORM WHEN THE PRINCIPAL, OR THE SURETY, OR BOTH, ARE A CORPORATION.

APPROVED AS TO SURETY AND APPROVED AS TO FORM:

AMOUNT OF BONDED SUM:

By: By:

Daniel Wall, Director of Public Works Zaynah N. Moussa, City Attorney

CORPORATE SEAL CORPORATE SEAL CORPORATE SEAL CORPORATE SEAL

Page 100 of 133 ends

BOND ACKNOWLEDGMENT
FOR
SURETY’S ATTORNEY-IN-FACT

STATE OF CALIFORNIA )
) ss

COUNTY OF )
On this day of , 20 ,
before me, (name), a Notary Public for said County, personally appeared (name), who proved to me on the basis of
satisfactory evidence to be the person whose name is subscribed to this instrument as the attorney in fact of, and acknowledged to me that he/she subscribed the name of thereto as principal, and his/he own name as attorney in fact.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Notary Public
SEAL

Page 101 of 133 ends

EXHIBIT 3 Bond No.:

Premium Amount: $
Bond’s Effective Date:

MAINTENANCE BOND
RECITALS:

1. The City of Vernon, California (“City”), has awarded to

(Name, address, and telephone of Contractor)
_______________________________________________________________________________________ (“Principal”),
a Contract (the “Contract”) for the Work described as follows:

Specification No. : in Vernon, CA.

2. Principal is required under the terms of the Contract— and all contract documents referenced in it (“Contract Documents”)— after completion of the Work and before the filing and recordation of a Notice of Completion for the Work, to furnish a bond to secure claims for Maintenance equal to ten percent (10%) of the total amount of the Contract Which shall hold good for a period of one (1) year from the date the City’s Notice of Completion and Acceptance of the Work is filed with the County Recorder, to protect the City against the result of faulty material or workmanship during that time.

3. The Contract and Contract Documents, including all their amendments and supplements, are incorporated into this Bond and made a part of it by this reference.

OBLIGATION:

THEREFORE, for value received, We, Principal and

(Name, address, and telephone of Surety)
______________________________________________________________________________________ (“Surety”), a duly admitted surety insurer under California’s laws, agree as follows:

By this Bond, We jointly and severally obligate and bind ourselves, and our respective heirs, executors, administrators, successors, and assigns to pay City the penal sum of
Dollars ($ ) (“the Bonded Sum”), this amount
comprising not less than ten percent (10%) of the total Contract Sum, in lawful money of the United States of America.

The Licensed Agent for Surety is:

(Name, address, and telephone)
Registered Agent’s California Department of Insurance License No. .

THE CONDITION OF THIS BOND’S OBLIGATION IS THAT if the said Principal or any of his or her or its subcontractors, or the heirs, executors, administrators, successors, or assigns or assigns of any, all, or either of them, shall fail to execute within a reasonable amount of time, or fail to respond within seven (7) days with a written schedule acceptable to the City for same, repair or replacement of any and all Work, together with any other adjacent Work which may be displaced by so doing, that proves to be defective in its workmanship or material for the period of one (1) year (except when otherwise required in the Contract to be for a longer period) from the date the City’s Notice of Completion and Acceptance, or equivalent, is filed with the County Recorder, ordinary wear and tear and unusual abuse or neglect excepted with respect to such Work and labor, the Surety herein shall pay for the same, in an amount not exceeding the sum specified in this Bond.

Page 102 of 133 ends

1. When City declares that Principal is in default under the Contract, or Contract Documents, or both, Surety shall promptly

Page 103 of 133 ends

remedy the default using a procurement methodology approved by City, select a contractor or contractors acceptable to City to complete all of the Work, and arrange for a contract between the contractor(s) and City. Surety shall make available sufficient funds to pay the cost of repair or replacement of any and all Work and to pay and perform all obligations of Principal under the Contract and Contract Documents including other costs and damages for which Surety is liable under this Bond except that Surety’s total obligation, as described here, will not exceed the Bonded Sum.

2. Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

3. Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of said Contract or to the Work to be performed thereunder or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

4. Surety’s obligations under this Bond are separate, independent from, and not contingent upon any other surety’s guaranteeing Principal’s faithful performance of the Work.

5. No right of action accrues on this Bond to any entity other than City or its successors and assigns.

6. If an action at law or in equity is necessary to enforce or interpret this Bond’s terms, Surety must pay, in addition to the Bonded Sum, City’s reasonable attorneys’ fees and litigation costs, in an amount the court fixes.

7. Surety shall mail City written notice at least 30 days before: (a) the effective date on which the Surety will cancel, terminate, or withdraw from this Bond; or (b) this Bond becomes void or unenforceable for any reason.

8. Death of the Principal shall not relieve Surety of its obligations hereunder. [Signatures to this Exhibit 3, Maintenance Bond, Begin on Next Page].

Page 104 of 133 ends

On the date set forth below, Principal and Surety duly executed this Maintenance Bond, with the name of each party appearing below and signed by its representative(s) under the authority of its governing body.

Date:

PRINCIPAL: SURETY:

(Company Name) (Company Name)

(Signature) (Signature)
By: By:
(Name and Title) (Name and Title)
Address for Serving Notices or Other Documents: Address for Serving Notices or Other Documents:

 THIS BOND MUST BE EXECUTED IN TRIPLICATE.
 EVIDENCE MUST BE ATTACHED OF THE AUTHORITY OF ANY PERSON SIGNING AS ATTORNEY-IN-FACT.  THE ATTORNEY-IN-FACT’S SIGNATURE MUST BE NOTARIZED.
 A CORPORATE SEAL MUST BE IMPRESSED ON THIS FORM WHEN THE PRINCIPAL, OR THE SURETY, OR BOTH, ARE A CORPORATION.

APPROVED AS TO SURETY AND APPROVED AS TO FORM:

AMOUNT OF BONDED SUM:

By: By:

Daniel Wall, Director of Public Works Zaynah N. Moussa, City Attorney

CORPORATE SEAL CORPORATE SEAL CORPORATE SEAL CORPORATE SEAL

Page 105 of 133 ends
← All documents from this meeting