Cities Index.
2. Proposed FY 2024-25 General Fee Schedule (Redline)

Vernon City Council
April 2, 2024

Document
2. Proposed FY 2024-25 General Fee Schedule (Redline)
Meeting
April 2, 2024
Body
Vernon City Council
Original file
338 KB
Text extracted from the city's file for reading and search. Open the original on cityofvernon.primegov.com. That file is the official record.

GENERAL FEE SCHEDULE
City of Vernon
Effective July 1, 20243
City of Vernon General Fee Schedule 2 of 20

CITY OF VERNON

GENERAL FEE SCHEDULE

TABLE OF CONTENTS
ADMINISTRATIVE FEES...............................................................................................................3 BUSINESS LICENSE FEES**............................................................................................................3 COPIES ...................................................................................................................................................3 CREDIT CARD PAYMENT FEE .........................................................................................................3 ELECTIONS ...........................................................................................................................................3 FILMING ................................................................................................................................................4 MISCELLANEOUS........................................................................................................................................4 PASSPORTS ...................................................................................................................................................4 STAFF TIME – Special Projects Beyond Normal Course of Business.................................................4 SUBPOENA DUCES TECUM ............................................................................................................4 BUILDING PERMIT FEES ..............................................................................................................5 PERMIT FEES........................................................................................................................................5 CERTIFICATE OF OCCUPANCY FEES.............................................................................................5 INSPECTION AND OTHER FEES.......................................................................................................6 ENGINEERING FEES ......................................................................................................................7 ENGINEERING FEES ...........................................................................................................................7 ENCROACHMENT FEES.....................................................................................................................7 GRADING.......................................................................................................................................................8

ENCROACHMENT PERMIT FAITHFUL PERFORMANCE BONDS OR CASH DEPOSIT REQUIREMENTS..................................................................................................................................8 Type of Work to be performed ...............................................................................................................8 FIRE PREVENTION SERVICE FEES...........................................................................................9 ENGINEERING FEES .........................................................................................................................10 FIELD PERMIT FEES .........................................................................................................................11 FILM UNIT FEES ................................................................................................................................13 FORESTRY FEES................................................................................................................................13 HIGH RISE FEES.................................................................................................................................13 LAND DEVELOPMENT UNIT FEES................................................................................................14 PETRO CHEM FEES ...........................................................................................................................15 REGIONAL SERVICE FEES ..............................................................................................................16

HEALTH AND ENVIRONMENTAL CONTROL PERMIT FEES
.........................................................................................................................................................9HEAL TH AND ENVIRONMENTAL CONTROL PERMIT FEES .........................................................17 City of Vernon General Fee Schedule 3 of 20
CERTIFIED UNIFIED PROGRAM AGENCY ..................................................................................17 FOOD PROTECTION PROGRAM.....................................................................................................17 CERTIFIED UNIFIED PROGRAM AGENCY ....................................................................................9 FOOD PROTECTION PROGRAM.......................................................................................................9

CITY OF VERNON

GENERAL FEE SCHEDULE

TABLE OF CONTENTS

HEALTH & ENVIRONMENTAL CONTROL SERVICE FEES
..........................................................................................................................................................11HEAL TH & ENVIRONMENTAL CONTROL SERVICE FEES............................................................18

POLICE FEES
..........................................................................................................................................................12POLI CE FEES ..........................................................................................................................................20

GENERAL
...............................................................................................................................................................12 0 FALSE ALARMS
...............................................................................................................................................................12 0 City of Vernon General Fee Schedule 4 of 20

ADMINISTRATIVE FEES
BUSINESS LICENSE FEES**
Warehousing
≤ 5,000 Square Feet $1,200.00
≥ 5,001 Square Feet (Maximum tax is $11,950.00) $0.21 per square feet Manufacturing
Based on number of employees Application
Hybrid Business
Please refer to business license tax calculation worksheet Application Contractor
Based on number of employees and quarters working Application Catering
Catering Vehicle-Cold Food (§ 5.08.070(B)(1)(b)) $602.00/yr.

Catering Vehicle-Hot Food (§ 5.08.070(B)(1)(a)) $787.00/yr.

Hazardous Waste Treatment, Storage or Disposal Facilities See Vernon Code § 5.08.100
Hazardous Waste Treatment, Storage or Disposal by or on behalf of related corporate entities.

See Vernon Code
§ 5.08.110
Waste to Energy Facilities See Vernon Code
§ 5.08.120
Solid Waste Materials Processing and Recycling Facilities See Vernon Code § 5.08.130
Lead-Acid Battery Recycling Facilities See Vernon Code
§ 5.08.140
** Business license fees not listed above may be found in Vernon Code Chapter 5 – Business License Taxes and other City Taxes.

COPIES
Standard $0.20 per page
Certified $16 per document
Oversized Plans $5.00 per sheet or
direct cost of
duplication
Special Projects Direct cost of
duplication
Audio/Video/CD/DVD duplication (medium provided by requestor) $5.00

CREDIT CARD PAYMENT FEE
City’s direct cost to process credit card transactions for the convenience of the credit card user shall be collected from the credit card user as part of the transaction.

ELECTIONS
Candidate Statement Deposit $250.00
Filing Fee – Intent to Circulate a Petition (Election Code Section 9202(b))
$200.00
City of Vernon General Fee Schedule 5 of 20

FILMING
Permit $268.00
Filming Location Fee – Private Property $150 per permit Filming Location Fee – Under City Control $650 per day
Filming Location Fee – City Street $650 per day
Health Department Inspection Fee $150 per permit
Building Department Inspection Fee $150 per permit
On-Duty Police Officer (See Filming Guidelines) Per Agreement with Police Officers
Association
Encroachment Inspector $75 per hour
Posting $110 per location
Encroachment, Traffic and Street Closure Fees See Engineering Fees Filming without a Permit* Double all permit
fees
*With the exception of film permit violations, all Filming Fees are collected on behalf of the City by the City’s Film Permit consultant (FilmLA).

MISCELLANEOUS
Returned Checks $26.00
Administrative Citations See Resolution No.
2011-195
Civil Penalties See Resolution No.
2011-195

PASSPORTS
Processing Fee (Established by the U.S. Department of State) $35.00 Photograph $15.00 per photo

ELECTRONICALLY STORED RECORDS OR DATA
Except as specifically listed in this Fee Schedule, the City may charge duplication costs for producing an electronic copy of a non-exempt public record including:
(a) All programming and computer services costs where production of the record requires data compilation, extraction or programming.
(b) For all such productions, the charge shall be based on the compensation for the actual employee or contractor performing the production multiplied by the amount of time spent programming, etc. Time shall be billed in fifteen (15) minute increments with no minimum grace period.

A deposit, based upon an estimate to fulfill a request, will be collected prior to commencement.

SUBPOENA DUCES TECUM
Documents - Deposit for civil cases. No charge for criminal cases per Evidence Code Section 1563(b)(1). No charge for Federal cases unless significant per Federal Rules of Civil Procedure Rule

45. $15.00 deposit
towards costs as
provided in CA
Evidence Code
Section 1563
Persons - Deposit for civil cases pursuant to Government Code Section 68096.1. No charge for criminal cases pursuant to Penal Code Section 1329.
$275.00 deposit
toward actual cost to
City
City of Vernon General Fee Schedule 6 of 20

BUILDING PERMIT FEES
PERMIT FEES Building, Electrical, Plumbing, Heating,
Ventilating, Cooling, a n d Refrigeration Permits

VALUATION FEE
$1.00 to $2,000.00 $111.00
$2,001.00 to $5,000.00 $111.00 for the first $2,000.00 plus $5.55 for each additional $100.00 or fraction thereof, up to
and including $5,000.00
$5,001.00 to $25,000.00 $277.00 for the first $5,000.00 plus $13.87 for each additional $1,000.00 or fraction thereof, up
to and including $25,000.00
$25,001.00 to $50,000.00 $555.00 for the first $25,000.00 plus $10.40 for each additional $1,000.00 or fraction thereof, up
to and including $50,000.00
$50,001.00 to $100,000.00 $815.00 for the first $50,000.00 plus $7.63 for each additional $1,000.00 or fraction thereof, up
to and including $100,000.00
$100,001.00 to $500,000.00 $1,196.00 for the first $100,000.00 plus $5.55 for each additional $1,000.00 or fraction thereof,
up to and including $500,000.00
$500,001.00 and up $3,415.00 for the first $500,000.00 plus $4.29 for each additional $1,000.00 or fraction thereof.

Plan Check Fee when required, shall be equal to 65% of the Permit Fee. Plan Check Energy Fee 25% of the Permit Fee. Permit Energy Fee 10% of the Permit Fee.

DESCRIPTION FEE
Green Building Standards Plan Review Mandatory Provisions $1,310.00 Green Building Standards Plan Review Tier 1 Provisions $2,619.00 Green Building Standards Plan Review Tier 2 Provisions $3,929.00 Green Building Standards Inspection Mandatory Provisions $1,284.00 Green Building Standards Inspection Tier 1 Provisions $2,536.00 Green Building Standards Inspection Tier 2 Provisions $3,788.00 Grading Plan Review Fee (First 3 sheets) $1,329.00
Grading Plan Review Fee Each Additional Sheet $289.00
NPDES LID Inspection $1,210.00
Industrial Wastewater Discharge Permit Application Review $180.00 Penalty Fees
Work commencing prior to the issuance of a permit shall be subject to an additional fee equal to the permit fee. (Authorized by California Building Code § 109.4.)

CERTIFICATE OF OCCUPANCY FEES

AFFECTED FLOOR AREA
Inspection Fee:
5,000 square feet or less $385.00
5,001 to 50,000 square feet $885.00
City of Vernon General Fee Schedule 7 of 20

BUILDING PERMIT FEES
50,001 to 100,000 square feet $1,046.00
Over 100,000 square feet $1,207.00
Issuance of a Temporary Certificate of Occupancy
Less than 5,000 square feet $385.00
Less than 50,000 square feet $885.00
50,001 to 100,000 square feet $1,046.00
Over 100,000 square feet $1,207.00

INSPECTION AND OTHER FEES

DESCRIPTION FEE
Permit Inspection outside of normal business hours (minimum charge four hours)
$244.00/hour
Minimum of $976.00
Inspection of work not requiring a permit $168.00/hr.

Re-inspection fee $168.00/hr.

Additional structural plan review required by changes, additions or revisions to the plans submitted or determination if an existing structure can accept additional loads
$321.00/hr.

Additional non-structural plan review required by changes, additions or revisions to the plans submitted
$168.00/hr.

Certified Access Specialist (CASp) Review Fee $136.00/hr.

Trailer Permit $507.00/trailer
Trailer Permit for subsequent years $507.00
Final Map, parcel map, or tentative map which contains four or less parcels or lots
$5,660.00
Final Map, parcel map, or tentative map which contains five or more parcels or lots
$13,730.00
Conditional Use Permit $19,251.00 plus applicant
is responsible for cost to
retain a consultant to
prepare the environmental
document for the project
plus a 25% administration
fee
Zoning Variance and Zoning Amendment $11,075.00
City of Vernon General Fee Schedule 8 of 20

BUILDING PERMIT FEES
Building Code Variance $4,879.00
Certificate of Compliance Fee $1,014.00
Covenant and Lot Merger Review Fee $937.00
Grant / Easement Deed Review $1,445.00
Zoning Verification $276.00
Commercial/Industrial solar panel or other alternative energy sources installation greater than 50kw
$1,000.00 plus $7.00 per
kW for each Kw above
50kW to 250kW and
$5.00 per kW above
250kW
Residential Solar Panel Installation $500 plus $15 per kW for each kW above 15kW
Water Efficient Landscape Plan Review and Inspection Fee $828.00 Sanitary Sewer Flow Study Fee $2,106.00
Green building Standards Administration Special Revolving fee $1.00 for every $25,000.00 or portion
thereof of valuation
Release of Building Drawings $64.00
Special Event Application / Public Assembly Application $134.00 Temporary Use Permit $1,000.00

ENGINEERING FEES

ENGINEERING FEES FEE
Lot Line Adjustment Fee Per App $2,902.00
Street Vacation Fee Per App $11,107.00

ENCROACHMENT FEES
Permit Issuance Fee Per App $161.00
Permit Inspection and Plan Check Fees Regular Time
$166.00/hr. Overtime
$244.00/hr.

Annual Permit Per App $578.00
Reconstruction Fees for Work Completed by City All other direct costs to the City resulting from
the Permitee’s activity,
calculated at actual cost
plus 25%
administrative cost
FRANCHISES AND LICENSES Issuance Annual Fee
Railroad crossings, conveyor bridges, and tunnels
across a street
$25,000.00 $3,210.00
City of Vernon General Fee Schedule 9 of 20

ENGINEERING FEES
Railroad Tracks, pipelines, or conduits along a
street
$25,000 for each
one-half (1/2) mile
or portion thereof
$3,210.00 for each onehalf (1/2) mile or
portion thereof
Pipelines or conduits across a street or a metering
manhole in the street
$12,500.00 $1,605.00
Building footings and appendages for traffic
sensors, signs, monitoring wells and architectural
projections
$5,000.00 $642.00
The fee for any encroachment not specifically listed in the table shall be the same fee for the most similar structure listed in the table as determined by the City.

GRADING
Low Impact Development Plan Review $2,770.00
Grading Inspection (No LID) $282.00

ENCROACHMENT PERMIT FAITHFUL PERFORMANCE BONDS OR CASH DEPOSIT

REQUIREMENTS
The amount of an encroachment permit cash deposit, certified or cashier' s check, surety bond, or letter of credit shall be determined by multiplying the quantity of asphalt paving, concrete paving, sidewalk, concrete curb, monuments and trench excavations proposed to be removed, disturbed or opened by the rate shown in the table below, the sum of the totals shall establish the minimum amount of the bond or deposit, except that in no case shall the faithful total security be less than $5,000. Authorized by Vernon Municipal Code §12.08.200.

Type of Work to be performed
Asphalt pavement $22.75/sq. foot
Concrete pavement and driveway $25.50/sq. foot
Concreate sidewalk $13.25/sq. foot
Concrete curb and gutter $67.50/lin. Foot
Trench excavations $9,630.00 each open excavation
Monument replacement $3,852.00/monument
City of Vernon General Fee Schedule 10 of 20

FIRE PREVENTION SERVICE FEES

ENGINEERING FEES - BUILDING PLAN REVIEW PLAN CHECK
Assembly Occupancy $613.00
Commercial (B, F, S, M) $675.00
Dwelling, 1 & 2 Family $491.00
Educational/Institutional Occupancy $920.00
Hazardous Materials Review (1-50 chemicals) $675.00
Hazardous Materials Review (51-100 chemicals) $1,104.00 Hazardous Occupancy $797.00
High Piled Combustible Storage $491.00
Multi-Family Residence $675.00
Site Plan Review - Water and Access $491.00
ENGINEERING FEES – FIRE ALARM SYSTEMS PLAN CHECK
Emergency Responder Radio Coverage $982.00
Fire Alarm System: > 131 devices $859.00
Fire Alarm System: 11-50 devices $429.00
Fire Alarm System: 51-90 devices $613.00
Fire Alarm System: 91-130 devices $736.00
Fire Sprinkler Monitoring system & Fire Alarm System with: <10 devices $245.00 Special Extinguishing Systems: CO2, FM 200, Foam Liquid Systems, Inert Gas (Halon, Inergen)
$368.00
ENGINEERING FEES – SPRINKLER PLAN CHECK
Fire Flow Test Witness/Perform $245.00
Fire Pump Installation $613.00
New NFPA 13 fire sprinkler system:< 100 heads per system $491.00 New NFPA 13 fire sprinkler system:> 100 heads per system $736.00 New NFPA 13D fire sprinkler system: one or two family dwelling $491.00 New NFPA 13R fire sprinkler system: Multifamily family dwellings $613.00 NFPA #22 fire water storage tank $491.00
Special hazard fire extinguishing foam water spray nozzle system $491.00 Standpipe System (Class I,II, & III) $463.00
TI to NFPA 13 fire sprinkler system:< 25 heads without calculation $245.00 TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation
$368.00
TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation $613.00 City of Vernon General Fee Schedule 11 of 20

ENGINEERING FEES - SPRINKLER PLAN CHECK
Underground fire protection system: 5 or more additional connections for hydrants or risers
$491.00
Underground fire protection system: single hydrant or single riser connection $307.00 ENGINEERING FEES – MISC BUILDING PLAN REVIEW
Additional plan review after initial review and one resubmittal (per hour) $123.00 Alternative Materials and Methods Review $480.00
Expedited review (each 2- hours + initial fee) $245.00
Plan review time (per hour) for modifications, re-stamp (minimum 1-hour) $123.00 Pre-Submittal Meeting (initial 2-hours) $245.00

FIELD PERMIT FEES
Activities in Hazardous Fire Areas $332.00
Aerosol Products $332.00
Amusement Buildings $332.00
Automobile Wrecking Yard $332.00
Aviation Facility $332.00
Battery Systems Stationary $332.00
Bonfires or Rubbish Fires $332.00
Carbon Dioxide Systems used in Beverage Dispensing Applications $332.00 Carbon Dioxide Enrichment Systems $332.00
Carnival & Fair Requirements $332.00
Combustible Dust Producing Operations $332.00
Combustible Fibers $332.00
Commercial Rubbish Handling Operation $332.00
Covered Mall Buildings $332.00
Cryogens Fluids $332.00
Cutting and Welding Permit $332.00
Dipping Operations $332.00
Dry Cleaning Plants $332.00
Emergency Helicopter Landing Facility for High Rise Buildings $332.00 Exhibits and Trade Shows $332.00
Fire Hydrants and Valves $332.00
Fireworks Display $332.00
Floor Finishing $332.00
Fruit and Crop Ripening $332.00
Fumigation/Thermal Insecticidal Fogging $332.00
Hazardous Materials $332.00
City of Vernon General Fee Schedule 12 of 20

FIELD PERMIT FEES
Hazardous Production Materials $332.00
High Piled Combustible Storage $332.00
Hot Work Operations $332.00
HPM Facilities $332.00
Industrial Ovens $332.00
Liquid Gas-Fueled Vehicles or Equipment $332.00
Lumber Yard and Woodworking $332.00
Magnesium $332.00
Miscellaneous Combustible Storage $332.00
Model Rockets $332.00
Motor Fuel-Dispensing Facilities $332.00
Open Burning $332.00
Open Flames and Candles $332.00
Open Flames and Torches $332.00
Organic Coating $332.00
Pallet Yards $332.00
Parade Float $332.00
Places of Assembly $332.00
Plant Extraction Systems $332.00
Private Fire Fighting Resources $332.00
Private Fire Hydrants $332.00
Pyrotechnic Special Effects Materials $332.00
Pyroxylin Plastics $332.00
Radioactive Materials $332.00
Recreational Fires $332.00
Refrigeration Equipment $332.00
Repair Garage/Automotive/Marine/Fleet Fuel Dispensing $332.00 Rifle Range $332.00
Special Events $332.00
Spraying or Dipping $332.00
Storage of Scrap Tires and by-Products $332.00
Tank Removal $332.00
Tank/Cistems $332.00
Temporary Sales Lots $332.00
Temporary Tents, Canopies, Membrane Structures $332.00
Tire Rebuilding Plants $332.00
Tire Storage $332.00
City of Vernon General Fee Schedule 13 of 20

FIELD PERMIT FEES
Waste Handling $332.00
Wood Products $332.00

FILM UNIT FEES
Film $282.00
Fuel Truck $208.00
Special Effects $288.00
Still Photos $277.00
FORESTRY FEES – FUEL MODIFICATION PLAN CHECK
Barns, garages, accessory structures $613.00
New Residential Structure greater than or equal to 2,500 sq. ft. in total area, within currently developing tracts of 25 or more lots.
$725.00
New residential, commercial, or industrial structures greater than or equal to 2,500 sq. ft. in total area, or additions/modifications to existing residential, commercial or industrial structures which increase the square footage of the structure by 50 percent or more and which addition/modification does not exceed 2,500 sq. ft. in total area.
$832.00
New residential, commercial, or industrial structures less than 2,500 sq. ft. in total area, or additions/modifications to existing residential, commercial or industrial structures which increase the square footage of the structure by 50 percent or more and which addition/modification does not exceed 2,500 sq. ft. in total area.
$711.00
Parcel maps / lot splits of 4 or fewer parcels $141.00
Tract maps - preliminary plan approval $980.00
Tract maps - final plan approval (Includes lots 5-20) $1,064.00 Each additional 10 lots over 20 $651.00
FORESTRY FEES – PLAN REVIEW AND INSPECTION OAK TREES
001-015 $775.00
016-050 $861.00
051-100 $1,551.00
101-200 $2,412.00
201-400 $4,135.00
401-999 $6,892.00
HIGH RISE FEES – BUILDING PLAN REVIEW PLAN CHECK
High Rise Buildings over 75 Feet in Height $1,472.00
HIGH RISE FEES – CONSTRUCTION FIELD INSPECTION
High Rise Buildings over 75 Feet in Height $665.00
City of Vernon General Fee Schedule 14 of 20
LAND DEVELOPMENT UNIT FEES – PLAN REVIEW PER MAP OR

AS NOTED
Clean Hands Waiver $262.00
Conditional Use Permit $384.00
Conditional Use Permit - Revised $225.00
Fire Hydrant Approval (Includes first 10 hydrants) $262.00 Each additional hydrant over 10 $43.00
Grading Plan Review - Fire Lanes and Private Driveways $507.00 Grant of Waiver $286.00
Lot Line Adjustments $262.00
Mobile Home Park $384.00
One Stop Meeting $153.00
Revised Exhibit A $262.00
Site Plan Review $139.00
Street Vacation $262.00
Tentative Parcel Map - Amendment $384.00
Tentative Parcel Map - Initial (3 Reviews) $1,120.00
Tentative Parcel Map - Revised $630.00
Tentative Parcel Map Revisions or Re-submit $323.00
Tentative Tract Map - Amendment $594.00
Tentative Tract Map - Initial (3 Reviews) $2,593.00
Each additional lot between 11-50 $20.00
Each additional lot between 51-100 $15.00
Each additional lot between 101-1000 $11.00
Each additional lot 1,001 or greater $6.00
Tentative Tract Map - Revised $1,243.00
Tentative Tract Map Revision or Re-submittal $384.00
Water Appeals Board $139.00
Water Plans and Systems Review for Compliance $262.00
Zone Change $262.00
LAND DEVELOPMENT UNIT FEES – PARCEL MAP PER

SUBMITTAL
01-04 Parcels $630.00
05-10 Parcels $691.00
11-50 Parcels $936.00
51 or more Parcels $1,120.00
Fourth and Subsequent Submittals $200.00
Verification of Condition - Parcel $262.00
City of Vernon General Fee Schedule 15 of 20
LAND DEVELOPMENT UNIT FEES –TRACT MAP (FINAL MAP)

PER SUBMITTAL
01-05 Lots $630.00
06-10 Lots $691.00
11-25 Lots $814.00
26-50 Lots $936.00
51 or more Lots $1,120.00
Fourth and Subsequent Submittals $200.00
Verification of Condition - Tract $262.00
PETRO CHEM FEES – FIELD PERMITS
Cellulose Nitrate Film $332.00
Compressed Gases $332.00
Explosives $332.00
Flammable or Combustible Liquids $332.00
LP Gas $332.00
Oil Natural Gas Wells $332.00
City of Vernon General Fee Schedule 16 of 20
REGIONAL SERVICE FEES–CONSTRUCTION FIELD INSPECTION
Assembly Occupancy $498.00
Commercial (B, F, S, M) $498.00
Dwelling, 1 & 2 Family $332.00
Educational/Institutional Occupancy $332.00
Hazardous Occupancy $415.00
High Piled Combustible Storage $997.00
Multi-Family Residence $332.00
Repair Garage $415.00
Tank Installation or Removal $415.00
Tenant Improvements Projects $332.00
REGIONAL SERVICE FEES – FIRE ALARM SYSTEM FIELD

INSPECTIONS
Emergency Responder Radio Coverage
Fire Alarm System: 11-50 devices
Fire Alarm System: 51-90 devices
Fire Alarm System: 91-130 devices
Fire Sprinkler Monitoring system & Fire Alarm System with: <10 devices Halon System/FM 200
UL-300 System (Hood Systems)
REGIONAL SERVICE FEES – FIRE SPRINKLER SYSTEM FIELD

INSPECTIONS
New NFPA 13 fire sprinkler system:< 100 heads per system $665.00 New NFPA 13 fire sprinkler system:> 100 heads per system $831.00 New NFPA 13D fire sprinkler system: one or two family dwelling $332.00 New NFPA 13R fire sprinkler system: Multifamily family dwellings $665.00 TI to NFPA 13 fire sprinkler system:< 25 heads without calculation $332.00 TI to NFPA 13 fire sprinkler system:> 25 heads and < 100 heads with/without calculation
$498.00
TI to NFPA 13 fire sprinkler system:>100 heads with/without calculation $581.00 Underground fire protection system: 5 or more additional connections for hydrants or risers
$665.00
Underground fire protection system: single hydrant or single riser connection $332.00 City of Vernon General Fee Schedule 17 of 20

HEALTH AND ENVIRONMENTAL CONTROL PERMIT FEES

CERTIFIED UNIFIED PROGRAM AGENCY

ABOVE GROUND PETROLEUM STORAGE ACT PROGRAM
Total Storage Capacity 1,320 to 10,000 Gallons $270.00
Total Storage Capacity 10,001 to 100,000 Gallons $539.00 Total Storage Capacity 100,001 to 1,000,000 Gallons $1,027.00 Total Storage Capacity 1,000,001 to 10,000,000 Gallons $2,054.00 Total Storage Capacity 10,000,001 to 100,000,000
Gallons $2,054.00
Total Storage Capacity 100,000,001 or more Gallons $2,054.00

HAZARDOUS MATERIALS BUSINESS PLAN PROGRAM
Hazardous Material Inventory Class A $488.00
Hazardous Material Inventory Class B $551.00
Hazardous Material Inventory Class C $2,042.00
Application Fee $327.00

UNDERGROUND STORAGE TANK PROGRAM
Annual Tank Operating Permit $818.00/Tank
Underground Storage Tank Facility $1,252.00/Facility

HAZARDOUS MATERIAL CLOSURE
Small $313.00
Medium $627.00
Large $940.00
Extra Large $976.00
Certificate of Closure $344.00

WELL PERMITS

DRILLING A WATER WELL
$648.00

DESTROYING OR CONVERTING AN EXISTING

WATER WELL
$648.00
DRILLING A MONITORING WELL less than 50 feet
$584.00

REPAIRING / MODIFYING A WELL
$478.00

FOOD PROTECTION PROGRAM

FOOD PERMITS
AGRICULTURAL OPERATION $207.00 Annual
CATERER $363.00 Annual
CATERER $121.00 Daily
COMMISSARY $741.00
FOOD PROCESSING Under 2000 square feet $520.00
City of Vernon General Fee Schedule 18 of 20

HEALTH AND ENVIRONMENTAL CONTROL PERMIT FEES
ESTABLISHMENT Over 2000 square feet $1,082.00
FOOD VENDING MACHINE BUSINESS $42.00 / machine
FOOD WAREHOUSE $416.00
RESTAURANT 0-30 SEATS $416.00
RESTAURANT 31 SEATS AND OVER $824.00
RETAIL FOOD MARKET $403.00
RETAIL FOOD PRODUCTION ESTABLISHMENT $403.00
TEMPORARY EVENT ORGANIZER $302.00
TEMPORARY FOOD FACILITY $117.00

FOOD VEHICLES
MOBILE FOOD FACILITY (CART) $225.00
WHOLE PRODUCE $225.00
MOBILE FOOD PREP UNIT (HOT TRUCK) $552.00 Annual
MOBILE FOOD PREP UNIT (HOT TRUCK) $186.00 Daily
WHOLESALE FOOD VEHICLE $122.00
RETAIL FOOD VEHICLE $122.00

NON-FOOD
GARMENT MANUFACTURING $395.00

LAUNDRY FACILITY (N/A IF FACILITY IS NOT A
VERNON BUSINESS) $313.00
LAUNDRY VEHICLE $122.00 per vehicle
WASTE PROCESSING FACILITY $446.00
WASTE TRANSFER STATION $313.00
WASTE COLLECTION BUSINESS $1,532.00
WASTE COLLECTION VEHICLE $266.00
WASTE COLLECTION VEHICLE YARD $334.00
RENDERING PLANT BUSINESS $543.00
RENDERING PLANT VEHICLE $266.00
WASTE DISPOSAL SITE $313.00
WATER SUPPLY UTILITY $10.00 / Service connection
LIQUID WASTE PUMPING BUSINESS $266.00
LIQUID WASTE PUMPING VEHICLE $232.00
OFFAL BUSINESS $266.00
OFFAL VEHICLE $232.00
City of Vernon General Fee Schedule 19 of 20

HEALTH & ENVIRONMENTAL CONTROL SERVICE FEES

GENERAL PLAN CHECK
1-5 sheets $547.00
6-10 sheets $1,017.00
11-25 sheets $1,330.00
Additional Sheets $232.00
City of Vernon General Fee Schedule 20 of 20

POLICE FEES

GENERAL FEE
Vehicle release fee - standard $50.00
Vehicle release fee - driving under the influence $144.00 Fee to release complete copy of arrest reports, traffic accident reports, incident reports
$20.00
Fee to release complete copy of arrest reports, traffic accident reports, and incident reports (certified)
$31.00
Repossession fee for vehicles repossessed in Vernon (Government Code 41612)
$15.00
VIN verification fee $44.00
Citation sign-off fee $44.00
DUI Emergency Response City’s cost
Subpoenas witness attendance deposit (Government Code Section 68097.2)
$275.00
Subpoenas for discovery motions $15.00
Basic Police background investigation $19.00
Video tape copy (blank tape provided by requester) – Digital $19.00

FALSE ALARMS
No charge for the first 3 within a fiscal year
4th false security alarm $168.00
5th false security alarm $207.00
6th false security alarm $246.00
7th false security alarm, and each additional security alarm thereafter
$284.00

← All documents from this meeting