Golden Gate Steel, Inc. dba Golden Gate Construction

Page 106 of 213 ends

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validit of that document.

State of California
County of Los Angeles
On April 3, 2.024 before me, Sunghee Ha, Notary Public
(insert name and title of the officer)
personally appeared Yohann Chang
who proved to me on the basis of satisfactory evidence to be the persons) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures) on the instrument the person(s), or the entity upon behalf of which the persons) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
.., ~~: -~~~h SUNGHEE HA
WITNESS my hand and official seal. Z F° ~~'' COMM. # 2364221 z w NOTARY PUBLIC •CALIFORNIA (1
LOS ANGELES COUNTY ~'
+u►o j' My C Omrn Exp~~e5 JUIy S. 1025
Signature ~L` (Seal)
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 107 of 213 ends

BOND ACKNOWLEDGMENT
FOR

SURETY'S ATTORNEY-IN-FACT

STATE OF CALIFORNIA
ss

COUNTY OF
On this day of , 20 ,
before me, (name), a Notary Public for said County, personally appeared (name), who proved to me on the basis of
satisfactory evidence to be the person whose name is subscribed to this instrument as the attorney in fact of, and acknowledged to me that he/she subscribed the name of as principal, and his/he own name as attorney in fact.
thereto
certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Notary Public
SEAL
Pale 170 oi~ 186
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 108 of 213 ends

• t • t 1 1 •
~'~ .i~~.i~~ ~~~~:~'.1C ~'~.4~i'~~~i\~ ~ ~.~C~'1~~:~t~'\~.'\C i~~C~t~~ 'At.'A~.~ Cwt.: '.LAN.'A~.:~~~i~~.:1~.'1•.'12~~~\~~2.9~t~.\~~L~CIL~~~:\C. :~~'TC.~C~~\.!:\~!:~~,:~~.

A notary public or other officer completing this certificate verifies only the identity of the individual who signet: the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Los Angeles
On ~ ~~ before me,
Date
personally appeared Pietro Micciche
Angel Nunez, Notary Public
Here Insert Name and Title of the Officer
1Vame(s) of Srgner(s}
who proved to me on the basis of satisfactory evidence to be the person( whose name(} is/~ subscribed to the within instrument and acknowledged to me that he%~~( j~ executed the same in his/~i~t~(~t~~ authorized capacity(), and that by his/~i~~~~Csignature~~'j on the instrument the person(}, or the entity upon behalf of which the person) acted, executed the instrument. f certify under PENALTY OF PER.3URY under tie Paws
of the State of Calif is that the foregoin paragraph
is true and corree~ ~~
WITNESS m hand d official seal.
~`„, ANGEL NUNEZ Signature `'`• ~"F Public •California Z .. ' ~\s. Notary
T' ~ eles County ~ rgnature of Notary Public
,. Los Ang
'~ Commission ~ 2 8270
Y ~•~;.oa"`* My Comm. Expires Mar ~4. 2028
Place Notary Seal Above
OPT/ONAL ~'p
Though this section is optional, completing this information can deer alteration of the document orfraudulenf reattachment of this form to an unintended document.

Description of Attached document
Title or Type of Document:

Number of Pages: ___ Signer{s) Other Than Named Above:

Capacity(ies~ Claimed by Signers)
Signer's Name:
~; Corporate Officer -- Title(s):
~_.:.~ Partner — --. Limi d General
❑ Individual 'Attorney in Fact
~~-:; Trustee (=J Guardian or Conservator
~i Other:

Signer Is Representing:

Document Date:

Signer's Name: _____ _____ ___
Corporate Officer — Title(s): __ ___._
I ~ Partner — -! Limited l__. General
~:.~ Individual ~~ ~ Attorney in Fact
J Trustee '. __'. Guardian or Conservator
Cl Other:

Signer Is Representing: _
,,.`...`.%~..•`. -~•~~:.~~~~.~.s ri.~✓•~!%v%~!%'°i%' i%~.,=~✓:~✓.~'.~.~-:.'~i:~.~4'✓:~'J4'L.~.~.~.:` • i\ZSt`~~\S/L't/i\~i~L:~✓~'Q/L~Y '✓S~L~"✓:'t/~~L~✓~.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 109 of 213 ends

EXHIBIT 3
Bond No.: GS29700135
Premium Amount: $Premium Included in Performance Bond
Bond's Effective Date: March 26th, 2024

MAINTENANCE BOND
RECITALS:

1. The City of Vernon, California ("City"), has awarded to Golden Gate Steel Inc. dba Golden Gate Construction 14709 Carmenita Road Norwalk CA (Name, address, and telephone of Contractor)
90650. (562) 210-8108
("Principal"),
a Contract (the '`Contract") for the Work described as follows:

Specification No. 20240259 : NORTH PARKING SECURITY FENCING in Vernon, CA.

2. Principal is required underthe terms of the Contract— and all contract documents referenced in it ("Contract Documents")— aftercompletion of the Work and before the filing and recordation of a Notice of Completion for the Work, to furnish a bond to secure claims for Maintenance equal to ten percent (10%) of the total amount of the Contract Which shall hold good for a period of one (1) year from the date the City's Notice of Completion and Acceptance of the Work is filed with the County Recorder, to protect the City against the result of faulty material or workmanship during that time.

3. The Contract and Contract Documents, including all their amendments and supplements, are incorporated into this Bond and made a part of it by this reference.

OBLIGATION:

THEREFORE, for value received, We, Principal and
The Gray Casualty &Surety Company, P.O. Box 6202 Metairie, LA 70009, (877} 857-6006 (Name, address, and telephone of Surety)
('`Surety"), a duly
admitted surety insurer under California's laws, agree as follows:

By this Bond, Wejointly and severally obligate and bind ourselves, and ourrespective heirs, executors, administrators, successors, and assigns to pay City the penal sum of Two Hundred Eighty Three Thousand Four Hundred Eighty Dollars ($ 283,480.00 ) ("the Bonded Sum"), this
amount comprising not less than ten percent (10%) of the total Contract Sum, in lawful money of the United States of America.

The Licensed Agent for Surety is:

Preferred Bonding &Insurance Services, 3455 Ocean View Blvd #200 Glendale, CA 81208, (323) 663-7814 (Name, address, and telephone)
Registered Agent's California Department of Insurance License No. OD69256 THE CONDITION OF THIS BOND'S OBLIGATION IS THAT if the said Principal or any of his or her or its subcontractors, or the heirs, executors, administrators, successors, or assigns or assigns of any, all, or either of them, shall fail to execute within a reasonable amount of time, or fail to respond within seven (7) days with a written schedule acceptable to the City for same, repair or replacement of any and all Work, together with any other adjacent Work which may be displaced by so doing, that proves to be defective in its workmanship or material for the period of one (1) year (except when otherwise required in the Contract to be for a longer period) from the date the City's Notice of Completion and Acceptance, or equivalent, is filed with the County Recorder, ordinary wear and tear and unusual abuse or neglect excepted with respect to such Work and labor, the Surety herein shall pay for the same, in an amount not exceeding the sum specified in this Bond.

1. When City declares that Principal is in default under the Contract, or Contract Documents, or both, Surety shall promptly

Page 16 ends

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 110 of 213 ends

workmanship or material for the period of one (1) year (except when otherwise required in the Contract to be for a longer period) from the date the City's Notice of Completion and Acceptance, or equivalent, is filed with the County Recorder, ordinary wear and tear and unusual abuse or neglect excepted with respect to such Work and labor, the Surety herein shall pay for the same, in an amount not exceeding the sum specified in this Bond.

1. When City declares that Principal is in default under the Contract, or Contract Documents, or both, Surety shall promptly remedy the default using a procurement methodology approved by City, select a contractor or contractors acceptable to City to complete all of the Work, and arrange for a contract between the contractors) and City. Surety shall make available sufficient funds to pay the cost of repair or replacement of any and all Work and to pay and perform all obligations of Principal under the Contract and Contract Documents including other costs and damages for which Surety is liable under this Bond except that Surety's total obligation, as described here, will not exceed the Bonded Sum.

2. Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

3. Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of said Contract or to the Work to be performed thereunder or the specifications accompanying the same shall in any manner affect its obligations on this bond, an~i •t does hereby waive notice ~f any such change: extension, alteration, or addition.

4. Surety's obligations under this Bond are separate, independent from, and not contingent upon any other surety's guaranteeing Principal's faithful performance of the Work.

5. No right of action accrues on this Bond to any entity other than City or its successors and assigns.

6. If an action at law or in equity is necessary to enforce or interpret this Bond's terms, Surety must pay, in addition to the Bonded Sum, City's reasonable attorneys' fees and litigation costs, in an amount the court fixes.

7. Surety shall mail City written notice at least 30 days before: (a} the effective date on which the Surety will cancel, terminate, or withdraw from this Bond; or (b) this Bond becomes void or unenforceable for any reason.

8. Death of the Principal shall not relieve Surety of its obligations hereunder.

Pale l71 of~ 186
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 111 of 213 ends

On the date set forth below, Principal and Surety duly executed this below and signed by its representatives) under the authority of its governing body.

Date: March 26th, 2024
PRINCIPAL:

Golden Gate Steel, Inc. dba Golden ~~C~onstruction
(Compan e
(Signature)
By: o ~nann Chan Pies ~e~
(Name and Ti e)
Address for Serving ~Jotices or Other Documents:
14709 Carmenita Road
Norwalk, CA 90650

CORPORATE SEAL
with the name of each party appearing
SURETY:

The Gray Casualty &Surety Company
--•----f6 pany Name)
(~. ~
.~~~~--~
(Signature)
gy. Pietro Micciche, Attorney-in-Fact
(Name and Title)
Address for Serving Notices or Other Documents:

P.O. Box 6202
Metairie, LA 70009

CORPORATE SEAL
■ THlS BOND MUST BE EXECUTED 1N TRIPLICATE.
■ EVIDENCE MUST BE ATTACHED OF THE AUTHORI NOF ANY PERSON SIGNING ASATTORNEY-IN-FACT. ■ THEATTORNEY-IN-FACT'S SIGNATUREMUST BE NOTARIZED.
■ A CORPORATE SEAL MUST BE IMPRESSED ON THIS FORM WHEN THE PRINCIPAL, OR THE SURETY. OR BOTH, ARE A CORPORATION.

APPROVED AS TO SURETY AND
AMOUNT OF BONDED SUM:

Daniel Wall, Director of Public Works
APPROVED AS TO FORM:

Zaynah N. Moussa, City Attorney

Page 172 ends

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 112 of 213 ends

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validit of that document.

State of California
County of Los Angeles
On April 3, 2024 before me, Sunghee Ha, Notary Public
(insert name and title of the officer)
personally appeared Yohann Chang
who proved to me on the basis of satisfactory evidence to be the persons) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures) on the instrument the person(s), or the entity upon behalf of which the persons) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
°''h SUNGHEE FaA
WITNESS my hand and official seal. v ~p~ ~ ~~`~ COMM. # 2364221 z w `~~ NOTARY PUBLIC • CALfFORNIA n
LOS ANGELES COUNTY ~
~~~_~ My (omm Expires July S, 2025
Signature ~ (Seal)
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 113 of 213 ends

BOND ACKNOWLEDGMENT
FOR

SURETY'S ATTORNEY-IN-FACT

STATE OF CALIFORNIA )
ss

COUNTY OF )
On this day of , 20 ,
before me, (name), a Notary Public for said County, personally appeared (name), who proved to me on the basis of
satisfactory evidence to be the person whose name is subscribed to this instrument as the attorney in fact of and acknowledged to me that he/she subscribed the
name of
attorney in fact.
thereto as principal, and his/he own name as
certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

Notary Public
SEAL

Page 173 of 186 ends

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 114 of 213 ends

1 t 1 Y ~ ~ •
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truihfufness, accuracy, or validity of that document.

State of California
County of Los An eles
On ~ before me, _
Date
personally appeared Pietro Micciche
Angel Nunez, Notary Public
Here Insert Name and Trtle of the officer
Names) of Signers)
who proved to me on the basis of satisfactory evidence to be the person( whose name(} is/~r~ subscribed to the within instrument and acknowledged to me that he%~~ j~ executed the same in his/~i~ ~ authorized capacity(, and that by hislS~ 3~t Csignature(~t} on the instrument the person{, or the entity .upon behalf of which the person} acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the forego~i gparagraph is true and correet~~ //
•~ = r ANGEL NUNEZ WITNESS had d official seal
~:: ~~~~~ ~^ ~' Notary Public •California Z
r ~
,: ~ Los Angeles County
~ Commission ~ 2482770 ~ignatur ~~t.foR~`* My Comm. Expires Mar 14, 2028 Signature of Notary Public
Place Notary Sea! Above

OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Documen#:

Number of Pages:

Document Date:

Signers) Other Than Named Above:

Capac~ty(ies~ Claimed by Signer{s)
Signer's Name:

J Corporate Officer — Title(s):
=; Partner — C- Lima d C~~ General
individual Attorney in Fac#
'.~~J Trustee ❑Guardian or Conservator
O#her:

Signer (s Representing:

Signer's Name: __ __
:Corpora#e Officer — Title(sj: . ~ _
L ~Partner — t ".1 Limited U General
~._.! Individual C Attorney in Fact
J Trustee ~~ Guardian or Conservator
❑ Other:

Signer Is Representing: __
Q ~ ~ 1 • ~ ► 1 1 i ! • i~~ ~ ~~ i~~ i • ti ~~
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 115 of 213 ends

I'refcrrrd Bonding Scivices
03/ I I.2O24 13: S2 1083~FSGU872
'THE GRAY INSURANCE COMPANY
TFIC GRAY CASUAL`tY & SURCTY COMPANY
GGNER.~t, PnWER OF ATTORNEY
Bond Numbcr:~f"J!/"~~~~~~ I'~•inci~~.~~:~IL,~~ ~~ `~~rv~'~ ~Yl ~. ~~~ (lv r~~~ G'~1~'~ ~Jr?~'~L1L~1 ~1~ Project: ~v^~~ ~''~^,'~~ ~,
(~(~1~}'~ ~~jy~~lYl~ k,~~Ci ~/~ ~J ~t'i(~ ~j`J
KNOW ALL l3Y '1~1 II;Sf: I'ItI;St:N~I~S. "11 IA'f ~I~hc (;ra~~ Insurance C'c~mpan~~ and '(~hc (ira~~ ~:asuahy & Surcl~- C'om~ian~ . cc~rporatic~ns duh~ organized and existing under the la~.vs ol~ Louisiana, and ha~•ing their principal of~ticcs in ~~~t<iiric. Louisia~ia. do hrr~b~~ make, constitute, and ap~wint: Patricia Icnizu, Elisabetc Salaiar,,~ngel Vunez, anel 1'ictro ~licciche of Lus f~n~;eles, C.~liti~rnia ,jointl~~ end se~•erally on behalfof etch of the Companies named ~bo~~e its U•ue and la~vl'ul Attorney(s)-in-fact, to make, eaccutc. se~~l and dcli~~cr, for and un its behalf and ~~s its ciccJ.

Uonds, or vthcr ~~~ritii~gs obligatory in the nature ufa bond. a5 sin•et~~. cunU•acts of suret~~shi~~ as arc car ma~~ be rc~~uired or perniittc~ b~~ la~~. regulation, conUact ear otherwise, provided that no bond car undertaking or conU•act ol'surct~,hip executed under thiti authcirit~ ,hill ~xc~cd the anu~unt of
$25.000,00O.00.
'I~his I'o4ver of AUorncy is granted and is si~ncd b~ laesimile under and by the authority ol~ the; li~llo~~~ing Resoluticins adoptecl b~• the 13oards ~~f t)irc;ctors cif both The Gray Insurance Comp~u~~ and '1'hc Graff C~isu~ilty &Surety Campan~~ at m~rtings duh~ callccl and held on lhc~ 26'x, dad ul' .lone. 2U0i.
..Itf SOI.VL;D, that the President. I:xccuti~c Vice I'resiclent. ~~nv Vice Pre;siJcnt, ur the ~ccrc;tar~~ lx; and each or ~n~~ of them hei~;by is authoriicd to execute a po4vcr ol'Attorney qualilying the attorney named in the gi~~c;n Po~~~er of Attorney to execute c>n bch~~ll~ofthc Comp~~n~~ bonds. undertakings, and all contracts ofsurety. and that each or an~~ of'them is hereby authorire~ to attest t~~ the cxe;cutiun ul'such I'o~~cr of'Auurne~~. and to aUach the ual ofthc Company; and it is
I~l llt~l I II.;K IZt:SOLVL•l), that the sign~itur~ ot~such otlicers flll(I lI1C SClII UI LIIN CUlllrany may be ul~lixcd to and such Po~~~er c~I~flUornc~~ or to an;. certificate rel~iting thereto by tac~imilc. ~ncl any tiuch Power e~I~AUorne~ ~~r ccrtitic~te hearing such fa:;similc signature or facsimile seal ~hall be binding upon the Company now aneJ in the; luturc ~►~hen su al'li~ed ~~ ith regard to an~~ bond. unelcrtaking or cunU•act ol'surct~~ te> ~rhich it i~ auachcd.

IN ~VfINI:SS 1~►~l1ERF;U(=. The Era}• Insurance Ce~mpan~~ end "fhe Grey Casuahy ~ Surct~ Company have roused their ui~tici~il seals to b~ hereinto atiucd, and these presents to Uc signed b~ their authorized ollicers this 4'~' day ot'No~~cmbcr. 2 22. ~e s u R ~N cF /~~~~~!%G~ ~IF~ ~ SJP~'~ Y~ ~ Sti9F
;l SEAL ~~ 13i : Michael 'f. Gray ('ullcn S. 1'iskc <~ SEAL •~ b ~;L ~ , t' Presidcnl President ~ _ ,
1`'••...,w ...'~.~ "1'hc Gray Insurance Compan~~ 'fhc Grail Casualty &Surety Cc~mp~n~~ y.~•••...., • ~~ *„ * . f
State cif L~~uisiana
SS:

Parish ot~.let~tc~s~~n
On this Ala' cla~~ ol'Novcmbcr. 2022, beli~re mc, a Nulary Nublic, person~~ll~~ appe~~r~cl Michael 'I'. Graff. I'resi~lcnt of'1'hc: Gray In~urancc (:umpany, and Cullen S. Piske. President of"I~he Gray Casualt~~ & Suret~~ Ccimpan~~, persoi~~illy knu~~m to mc, being duly s~~~orn. acknu~vledgecl that they signed the above P~~~~~er ol'Attorncy ~md af7ixecl the se~~ls of the c~~mp~u~ies as officers cat: and aeknc~~vledged said insU•tuncnt tci he the volunt~u•y act and decd, af~thcir companies. 4
~'v '' Ivot2ry Pubic
yotar~ ID No.92653
~. ~ ~~ ~ Uf~eat.S Palish, Louisiar~~
:, ~
Leigh Anne I{enic~n
Not~u-y Public. P~u•ish ufni•Ic~~ns State of l,ouisi~tna N1~- Commission is liar l,ile
L Mark S. Mangano. Secretary ot"I~he (nay [nstu•ance ('ompan~~, d~ herrby certily ll~at the abo~~c ~incl li►r~oing is a U•uc and a~rrcct copy of a Power of illturncy given by the compaiti •~. which is dill in lull lurce uncl el~l'ect. IN WI'INl;SS ~~►'I IGRI;UI~. I ha~c pct my hand and al'fia~d the seals o1'the Company this~~(,~da~~ of /~1011(~(/~ ~Zh . r
' ' ~ J/
I, Leigh Anne 1-lenican. Secretary n('"I~hc Gray C~~s~~dity ~ s~~~~<<y~ e~~~~„i,~~~,~~ . do hercb~: certily that the above; anal li~r~~iing is a true and4 c,rrcct copy ofa Po~~•er of Attorney gi~~cn b~~ the companies. which is still in lull lurcc and .;licc:t. IN ~VI'I~NI~SS W! II;RI UI~. 1 have set my hind and atlixcd the seals uf'the Company this f~day of ,MQ~'~(,~ ~Z, 1 . + ~ ~ ^ ~ ~
t1
~S URAti,
..• • ~~F
a~ =v
;= SEAL
• * .
c~r`P~SY•
6-SU,Q~.c
a' SEAL ~' ~; b ~,t
a
~a~cee
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 116 of 213 ends

EXHIBIT 4

INSURANCE REQUIREMENTS

1.0 REQUIRED INSURANCE POLICIES
At its own expense, Contractor shall obtain, pay for, and maintain – and shall require each of its Subcontractors to obtain and maintain – for the duration of the Agreement, policies of insurance meeting the following requirements:

A. Workers’ Compensation/Employer’s Liability Insurance shall provide workers’ compensation statutory benefits as required by law.

1. Employer’s Liability insurance shall be in an amount not less than:
(a) ONE MILLION DOLLARS ($1,000,000) per accident for bodily injury or disease; (b) ONE MILLION DOLLARS ($1,000,000) per employee for bodily injury or disease; and
(c) ONEMILLION DOLLARS ($1,000,000) policy limit.

B. Commercial General Liability (“CGL”) (primary). City and its employees and agents shall be added as additional insureds, not limiting coverage for the additional insured to “ongoing operations” or in any way excluding coverage for completed operations. Coverage shall apply on a primary, non-contributing basis in relation to any other insurance or self-insurance, primary or excess, available to City or any employee, representative or agent of City.

Coverage shall not be limited to the vicarious liability or supervisory role of any additional insured. Coverage shall contain no contractors’ limitation or other endorsement limiting the scope of coverage for liability arising from explosion, collapse, or underground property damage.

1. CGL insurance must not be written for less than the limits of liability specified as follows:
(a) TWO MILLION DOLLARS ($2,000,000) per occurrence for bodily injury (including accidental death) to any one person;
(b) TWO MILLION DOLLARS ($2,000,000) per occurrence for personal and advertising injury to any one person;
(c) TWO MILLION DOLLARS ($2,000,000) per occurrence for property damage; and (d) FOURMILLION DOLLARS ($4,000,000) general aggregate limit.

2. CGL insurance must include all major divisions of coverage and must cover:
(a) Premises Operations (including Explosion, Collapse, and Underground [“X,C,U”] coverages as applicable);
(b) Independent Contractor’s Protective;
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 117 of 213 ends

(c) Independent Contractors;
(d) Products and Completed Operations (maintain same limits as above until five (5) years after recordation of Notice of Completion);
(e) Personal and Advertising Injury (with Employer’s Liability Exclusion deleted); (f) Contractual Liability (including specified provision for Contractor’s obligation under Article 11 of the General Conditions); and
(g) Broad Form Property Damage.

3. Umbrella or Excess Liability Insurance (over primary), if provided, shall be at least as broad as any underlying coverage. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross liability exclusion and no contractor’s limitation endorsement. The policy shall have starting and ending dates concurrent with the underlying coverages. The Named Insured may determine the layering of primary and excess liability insurance provided that if such layering differs from that described here, the actual coverage program meets the minimum total required limits and complies with all other requirements listed here.

C. Business Automobile Liability Insurance

1. Business Automobile Liability Insurance must cover all vehicles, whether rented, leased, hired, scheduled, owned or non-owned. If Contractor does not own any vehicles, this requirement may be satisfied by a non-owned vehicle endorsement to the general and umbrella liability policies. Business Automobile Liability Insurance coverage amounts shall not be less than the following:
(a) ONE MILLION DOLLARS ($1,000,000) per occurrence for bodily injury (including accidental death) to any one person; and
(b) ONEMILLION DOLLARS ($1,000,000) per occurrence for property damage; or (c) ONEMILLION DOLLARS ($1,000,000) combined single limit.

E. Builder’s Risk Insurance

1. Builder’s Risk Insurance covering all real and personal property for “all risks” of loss or “comprehensive perils” coverage including but not limited to the perils of earth movement including earthquake and flood for all buildings, structures, fixtures, materials, supplies, machinery and equipment to be used in or incidental to the construction at the site, off site, or in transit, for the full replacement value of such properties. Coverage shall be included for property of others in the care, custody or control of the insured for which any insuredmay be liable. The City will purchase a builder’s risk policy for the Project instead of a contractor purchased policy. Bidder should not include cost for this coverage in his/her bid.

2.0 GENERAL REQUIREMENTS—ALL POLICIES
A. Qualifications of Insurer. At all times during the term of this Contract, Contractor’s insurance company must meet all of the following requirements:

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 118 of 213 ends

1. “Admitted” insurer by the State of California Department of Insurance or be listed on the California Department of Insurance’s “List of Surplus Line Insurers” (“LESLI”);

2. Domiciled within, and organized under the laws of, a State of the United States; and

3. Carry an A.M. Best & Company minimum rating of “A:VII”.

B. Continuation Coverage. For insurance coverages that are required to remain in force after the Final Payment, and if reasonably available, Contractor shall submit to City, with the final Application for Payment, all certificates and additional insured endorsements evidencing the continuation of such coverage.

C. Deductibles or Self-Insured Retentions. All deductibles or self-insured retentions are subject to City’s review and approval, in its sole discretion.

D. Commercial General Liability and Business Automobile insurance policies must be written on an “occurrence” basis and must add the City of Vernon and its officers, agents, employees and representatives as additional insureds.

E. Contractor’s Insurance Primary. Other insurance (whether primary, excess, contingent or selfinsurance, or any other basis) available to City, or its representatives, or both, is excess over Contractor’s insurance.

City’s insurance, or self-insurance, or both, will not contribute with Contractor’s insurance policy.

F. Waiver of Subrogation. Contractor and Contractor’s insurance company waive— and shall not exercise— any right of recovery or subrogation that Contractor or the insurer may have against City, or its representatives, or both.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 119 of 213 ends

G. Separation of Insureds. Contractor’s insurance policy applies separately to each insured or additional insured who is seeking coverage, or against whom a claim is made or suit is brought, except that the naming of multiple insureds will not increase an insurance company’s limits of liability.

H. Claims by Other Insureds. Contractor’s insurance policy applies to a claim or suit brought by an additional insured against a Named Insured or other insured, arising out of bodily injury, personal injury, advertising injury, or property damage.

I. Premiums. City is not liable for a premium payment or another expense under Contractor’s policy J. At any time during the duration of this Contract, City may do any one or more of the following:

1. Review this Agreement’s insurance coverage requirements;

2. Require that Contractor obtain, pay for, and maintain more insurance depending on City’s assessment of any one or more of the following factors:
(a) City’s risk of liability or exposure arising out of, or in any way connected with, the services of Contractor under this Agreement;
(b) The nature or number of accidents, claims, or lawsuits arising out of, or in any way connected with, the services of Contractor under this Agreement; or (c) The availability, or affordability, or both, of increased liability insurance coverage.

3. Obtain, pay for, or maintain a bond (as a replacement for an insurance coverage) from a California corporate surety, guaranteeing payment to City for liability, or costs, or both, that City incurs during City’s investigation, administration, or defense of a claim or a suit arising out of this Agreement; or
K. Contractor shall maintain the insurance policy without interruption, from the Project’s commencement date to the Final Payment date, or until a date that City specifies for any coverage that Contractor must maintain after the Final Payment.

L. Contractor shall not allow any insurance to expire, cancel, terminate, lapse, or non-renew.

Contractor’s insurance company shall mail City written notice at least thirty (30) days in advance of the policy’s cancellation, termination, non-renewal, or reduction in coverage and ten (10) days before its insurance policy’s expiration, cancellation, termination, or non-renewal, Contractor shall deliver to City evidence of the required coverage as proof that Contractor’s insurance policy has been renewed or replaced with another insurance policy which, during the duration of this Agreement, meets all of this Agreement’s insurance requirements.

M. At any time, upon City’s request, Contractor shall furnish satisfactory proof of each type of insurance coverage required— including a certified copy of the insurance policy or policies; certificates, endorsements, renewals, or replacements; and documents comprising Contractor’s self-insurance program— all in a form and content acceptable to the City Attorney or City’s Risk Manager.

N. If Contractor hires, employs, or uses one or more Subcontractor(s) to perform work, services, operations, or activities on Contractor’s behalf, Contractor shall ensure that the Subcontractor complies with the following.

1. Meets, and fully complies with, this Agreement’s insurance requirements; and Golden Gate Steel, Inc. dba Golden Gate Construction

Page 120 of 213 ends

2. Furnishes City at any time upon its request, with a complete copy of the Subcontractor’s insurance policy or policies for City’s review, or approval, or both. Failure of City to request copies of such documents shall not impose any liability on City, or its employees.

O. Contractor’s failure to comply with an insurance provision in this Agreement constitutes a material breach upon which City may immediately terminate or suspend Contractor’s performance of this Agreement, or invoke another remedy that this Agreement or the law allows. At its discretion and without waiving any other rights it may have pursuant to law, City has the right but not a duty to obtain or renew the insurance and pay all or part of the premiums. Upon demand, Contractor shall repay City for all sums or monies that City paid to obtain, renew, or reinstate the insurance, or City may offset the cost of the premium against any sums or monies that City may owe Contractor.

3.0 CONTRACTOR’S SUBMITTAL OF CERTIFICATES AND ENDORSEMENTS A. Contractor shall have its insurance carrier(s) or self-insurance administrator(s) complete and execute the following insurance documents and shall deliver said documents at the same time Contractor delivers this Agreement to City. City will neither sign this Agreement nor issue a “Notice to Proceed” until the City Attorney or City’s Risk Manager has reviewed and approved all insurance documents. City's decision as to the acceptability of all insurance documents is final. Sample insurance documents in the City’s approved format are set forth in this 4.

B. Required Submittals for Commercial General Liability and Business Automobile Insurance and Contractor’s Pollution Liability Insurance. The following submittals must be on forms satisfactory to the City Attorney or City’s Risk Manager, and signed by the insurance carrier or its authorized representative – which fully meet the requirements of, and contain provisions entirely consistent with, all of the insurance requirements set forth herein.

1. “Certificate of Insurance”

2. “Additional Insured Endorsement”

3. Subrogation Endorsement: “Waiver of Transfer to Rights of Recover Against Others” Both Certificates of Insurance and Additional Insured Endorsements must read as follows: “The City of Vernon, and its officers, agents, employees and representatives are included as additional insureds under the policy(s). This insurance is primary to all other insurance of the City. The City’s insurance and self-insurance will apply in excess of, and will not contribute with this insurance. This insurance applies separately to each insured or additional insured who is seeking coverage, or against whom a claim is made or a suit is brought. The issuing company shall mail thirty (30) days advance notice to the City for any policy cancellation, termination, non-renewal, or reduction in coverage.” C. Required Submittals for Workers’ Compensation Insurance. Contractor shall provide City with a certificate of insurance and a subrogation endorsement on forms satisfactory to the City Attorney or City’s Risk Manager, and signed by the insurance carrier or its authorized representative – which fully meet the requirements of, and contain provisions entirely consistent with, this Contract’s workers compensation insurance requirements. If Contractor is self-insured for workers’ compensation, a copy of the “Certificate of Consent to Self-insure” from the State of California is required; or if Contractor is lawfully exempt from workers’ compensation laws, an “Affirmation of Exemption from Labor Code §3700” form is required.

D. Required Evidence of Builder’s Risk Coverage. City will provide a certificate of insurance and a declarations page on a form satisfactory to the City Attorney or City’s Risk Manager, and signed by the insurance carrier or its authorized representative. The policy terms must fully meet the requirements of, and contain provisions entirely consistent with, all of the insurance requirements set forth herein. The City shall be named as a loss payee on the insurance policy for the full replacement value of all buildings, structures, fixtures and materials to be constructed, maintained, repaired or supplied pursuant to this Contract.

E. Contractor agrees to monitor and review all such coverage and assumes all responsibility for Golden Gate Steel, Inc. dba Golden Gate Construction

Page 121 of 213 ends

ensuring that all required coverage is provided. Contractor agrees to obtain certificates evidencing such coverage.

F. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor that includes City or any other indemnitee as a defendant. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City.

G. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor.

H. Any “self-insured retention” must be declared and approved by City. City reserves the right to require the self-insured retention to be eliminated or replaced by a deductible. Self-funding, policy fronting or other mechanisms to avoid risk transfer are not acceptable. If Contractor has such a program, Contractor must fully disclose such program to City.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 122 of 213 ends
Page 180 of 186 ends

EXHIBIT 5
Statement of Intent to Comply with Minimum Requirements of the Stormwater Permit

CITY OF VERNON

PUBLIC WORKS DEPARTMENT
Construction Stormwater Program
Permit Number: Date:

Applicant: Phone:

Project Address:

Property Owner:

Contractor:

Contractor’s Address:

The National Pollutant Discharge Elimination System (NPDES) is a portion of the Clean Water Act that applies to the protection of receiving waters. Under permits from the Los Angeles Regional Water Quality Control Board (RWQCB), certain activities are subject to RWQCB enforcement. To meet the standards of the Waste Discharge Requirements for Municipal Separate Storm Sewer System (MS4) Discharges within the Coastal Watershed of Los Angeles County, Except those Discharges Originating from the City of Long Beach MS4 (CAS004001), the City of Vernon has adopted minimum standards for stormwater runoff from development construction activities.

These minimum standards require the implementation of an effective combination of erosion and sediment control Best Management Practices (BMPs) to prevent erosion and sediment loss, and the discharge of construction waste at each site. At a minimum, the construction activity associated with the construction project identified above shall be conducted in such a manner that:
¾ Prevents illicit construction-related discharges of pollutants into the MS4 and receiving waters. ¾ Implements and maintains structural and non-structural BMPs to reduce pollutants in stormwater runoff from construction sites.
¾ Reduces construction site discharges of pollutants to the MS4 to the maximum extent practicable. ¾ Prevents construction site discharges to the MS4 from causing or contributing to a violation of water quality standards.

Note: The Stormwater BMP Construction Handbook sheets developed by the California Stormwater Quality Association shall be used as guidance in determining and implementing required BMPs. The BMP sheets may be reviewed at the Public Works Department counter during regular business hours. A General Construction Permit shall be obtained and maintained for all construction sites one (1) acre or greater. Additional conditions may be required for these sites. 4/17/24
Golden Gate Construction, Inc 562-210-8108
4305 Santa Fe Ave., Vernon, CA 90058
City of Vernon
Golden Gate Construction, Inc.
14709 Carmenita Road, Norwalk, CA 90650
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 123 of 213 ends
Page 181 of 186 ends

I have read and understand the requirements listed above and certify that I will comply with the minimum requirements above.

Signature:

Print Name:

Title:

Property Owner:

Stephen Lim
PM
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 124 of 213 ends
Page 182 of 186 ends

EXHIBIT A6
Statement of Intent to Comply with Minimum Requirements of the California Covid-19 Industry Guidance: Construction

CITY OF VERNON

PUBLIC WORKS DEPARTMENT
Project Address:

Property Owner:

Contractor:

Contractor’s Address:

The latest COVID-19 industry guidelines can be accessed at the following web address:
https://www.dir.ca.gov/dosh/coronavirus/Guidance-by-Industry.html This document provides guidance for the construction industry to support a safe, clean environment for workers. The guidance is not intended to revoke or repeal any worker rights, either statutory, regulatory or collectively bargained, and is not exhaustive, as it does not include county health orders, nor is it a substitute for any existing safety and health-related regulatory requirements such as those of Cal/OSHA.1 Stay current on changes to public health guidance and state/local orders, as the COVID-19 situation continues. Cal/OSHA has more safety and health guidance on their Cal/OSHA COVID-19 Infection Prevention for Construction 2 Employers and Workers webpage.

CDC has additional guidance for businesses and employers.

I have read and understand the requirements listed above and certify that I will comply with the minimum requirements above.

Signature: Date:

Print Name:

Title:
above.
4305 Santa Fe Ave. Vernon, CA 90058
City of Vernon
Golden Gate Steel, Inc. DBA Golden Gate Construction
14709 Carmenita Road Norwalk, CA 90650
Stephen Lim
PM
April 17, 2024
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 125 of 213 ends

EXHIBIT B

SPECIAL PROVISIONS

SPECIFIC FOR THIS PROJECT
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 126 of 213 ends

EXHIBIT B – SPECIAL PROVISIONS

SPECIFIC FOR THIS PROJECT
North Parking Security Fencing
Contract No. 20240259
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 127 of 213 ends

Table of Contents
A. General.................................................................................................................................................. 4

1. Scope of Work .................................................................................................................................. 4

2. Contract Specifications..................................................................................................................... 4

3. Specifications.................................................................................................................................... 4

4. Length of Contract............................................................................................................................ 4

5. Liquidated Damages......................................................................................................................... 4

6. Delays and Extensions of time.......................................................................................................... 4

7. Quality of Work ................................................................................................................................ 5

8. Unit Prices........................................................................................................................................ 5

9. Extra Work........................................................................................................................................ 5

10. Compliance with Laws, Regulations, and Safe Practices.................................................................. 6 B. Construction Phase Specifications......................................................................................................... 6

1. Scheduling of Work .......................................................................................................................... 6

2. Material Submittals.......................................................................................................................... 6

3. Weather Limitations......................................................................................................................... 6

4. Construction Hours.......................................................................................................................... 6

5. Notification of Affected Residents/Businesses................................................................................. 7

6. Notification of Utilities..................................................................................................................... 7

7. Protection of the Public.................................................................................................................... 7

8. Noise Restrictions............................................................................................................................. 8

9. Construction Order of Work............................................................................................................. 8

10. Character of Workers....................................................................................................................... 9

11. Examination of Site .......................................................................................................................... 9

12. Mobilization...................................................................................................................................... 9

13. Dust Control ..................................................................................................................................... 9

14. Best Management Practices (BMP’s) ............................................................................................... 9

15. Temporary Water Meter.................................................................................................................. 9

16. Cleaning of Site During Construction.............................................................................................. 10

17. Sanitary Facilities............................................................................................................................ 10

18. Final Cleaning of Site and Restoration............................................................................................ 10

19. Contractor Responsibility ............................................................................................................... 10 C. Material Specifications........................................................................................................................ 11 Golden Gate Steel, Inc. dba Golden Gate Construction

Page 128 of 213 ends

1. Unclassified Excavation .................................................................................................................. 11

2. Saw-cutting..................................................................................................................................... 11

3. Omega Black Fence ........................................................................................................................ 11

4. Vehicle Access Gates...................................................................................................................... 11

5. Inductive Loop Detectors, Sealants, Sensor Units.......................................................................... 12

6. Pedestrian Gates............................................................................................................................ 13

7. Chain-Link Cage .............................................................................................................................. 13 Golden Gate Steel, Inc. dba Golden Gate Construction

Page 129 of 213 ends

A. General

1. Scope of Work
This project consists of furnishing and installation of 8-ft high fencing, vehicle access gates, detection loops, pedestrian access gates, and staircase enclosures for the north parking structure of City Hall.

2. Contract Specifications
The details and the exact limits for the asphalt and concrete work in this project are shown on the City of Vernon Contract No. 20240259 sheet drawings, incorporated into this Agreement by this reference:

Sheet No. Plan
No.

Description
1 B2783 North Parking Security Fencing Plans

3. Specifications
Installation and payment for all the work shall conform to the Standard Specifications for Public Works Construction (2021 Edition), State of California Department of Transportation (Caltrans) Standard Plans(2022 Edition) and State of California Department of Transportation Standard Specifications (2018 Edition), latest edition of the California Manual on Uniform Traffic Control Devices, and the City of Vernon Standard Plans.

The Standard Specifications for Public Works Construction (2021 Edition) shall be referred to hereafter as the Standard Specifications. The Caltrans Standard Plans (2022 Edition) shall be referred to hereafter as the Caltrans Standard Plans.

4. Length of Contract
All work in this project shall be completed within ninety (90) calendar days after Contractor’s receipt of material. Material submittals and product ordering shall be completed within 30 calendar days of the award of the contract.

5. Liquidated Damages
In accordance with Section 6-9 of the Standard Specifications, for each consecutive calendar day in excess of the time specified for completion of the work, as adjusted in accordance with Section 6-9 of the Standards Specifications, the Contractorshall pay to the agency, or have withheld from monies due it, the sum of two hundred and fifty ($250) per calendar day.

6. Delays and Extensions of time
The provisions of Section 6-4 entitled "Delays and Extensions of Time" of the Standard Specifications shall apply except as modified and supplemented below.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 130 of 213 ends

The second paragraph ofsubsection 6-4.1 is hereby deleted and the following paragraph shall be inserted in its place:

No extension of time will be granted for a delay caused by the inability of the Contractor to obtain materials, equipment and labor, except as authorized by the City's Project Manager. The length of contract time stipulated includes any time which may be required to obtain materials, equipment and labor, and the Contractorin submitting a bid shall be deemed to have ascertained the availability of materials, equipment and labor and considered same in his/her proposed construction schedule.

Due to current supply chain disruptions, the City’s Project Manager is authorizing that the Notice to Proceed will not be issued until the material has been delivered, so long as submittals have been made and the material has been ordered within the 30 calendar days of the award of the Contract.

7. Quality of Work
The provisions of Section 3 entitled "Control of the Work" of the Standard Specifications shall apply. In addition, any work deemed unacceptable by the City's Project Manager, whether a cause is determined or not shall be repaired or replaced by the Contractor at his/her expense.

8. Unit Prices
All costs not covered by specific unit prices but required for a complete job in place, shall be included in the items most related to the work.

9. Extra Work
In the event the City and the Contractor are unable to negotiate an agreed price for extra work, which is acceptable to both parties, payment shall be made based on time and materials as follows:
• Work by the Contractor: The following percentages shall be added to the Contractor's cost and shall constitute the markup for all overhead and profits:

1. Labor 33%

2. Materials 15%

3. Equipment Rental 15%

4. Other Items and Expenditures 15%
• Work by the Subcontractor: When all or any part of the extra work is performed by a subcontractor, the markup provided by the Contractor as mentioned above shall apply to the subcontractor’s actual costs. A markup of 5% of the subcontracted portion of each extra work may be added for the Contractor.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 131 of 213 ends

10. Compliance with Laws, Regulations, and Safe Practices The Contractor shall perform all work in a safe, competent manner and in accordance with all federal, state, and local statues, regulations, ordinances, rules, and governmental orders. The Contractor will be solely and completely responsible for the conditions of the job site, including safety of all persons and property during performance of the work. This requirement will apply continuously and not be limited to normal working hours. Inspection of the Contractor's performance by the City, its agents, or employees is not intended to include review of the adequacy of the Contractor's safety measures in or near the job site.

B. Construction Phase Specifications

1. Scheduling of Work
The Contractor shall submit their work schedule to the City's Project Manager prior to the preconstruction meeting. The construction schedule shall show the sequence of work, critical path and estimated time for completion of each segment of work. This schedule must be reviewed and accepted by the City's Project Manager before the Contractor will be permitted to begin work. In addition, the Contractor shall submit a detailed schedule forecasting two weeks of work describing each day’s work. This schedule shall be updated and submitted to the City every other Monday during the construction period. The Contractor shall give 48 hours’ notice to the City's Project Manager prior to the start of the work.

2. Material Submittals
The Contractor shall provide all required submittals including, but not limited to the following:
• Shop drawings
• Materials and mix designs (submitted upon reward of the contract for review and approval before the construction); and
The “Notice to Proceed” will not be issued to the Contractor until all the submittals have been reviewed and approved by the City.

3. Weather Limitations
Placement operations shall not be performed during wet conditions or if rain or cold conditions (less than 45°F) are imminent or predicted to exist at any time. “Imminent or predicted” is defined as being forecasted within a 48-hour period on the National Weather Service Web Site http://www.wrh.noaa.gov for the most representative and nearest location listed where placement is to begin and end.

4. Construction Hours
Work shall occur Monday-Thursday between the hours of 7:00 am to 6:00 pm, and Friday through Sunday between the hours of 6:00 am to 6:00 pm unless otherwise restricted by the type of work shown below:

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 132 of 213 ends

• Construction within entrance and exit ways to consider higher volumes of traffic between the hours of 6:00 am – 8:00 am and 4:00 pm – 6:00 pm • One set of entrance / exit maintained open at all times with proper notification scheduled.

5. Notification of Affected Residents/Businesses
The Contractor shall be responsible for distribution of the general information letter of the project to all affected residents and businesses. A project general information letter and sufficient copies thereof will be prepared by City staff for Contractor distribution to all residents, business establishments, and institutions fronting on or directly affected by the project.

The Contractor shall be responsible for distribution of said letter in handout form to all the appropriate residences and buildings in the subject area. Distribution shall be accomplished in a manner acceptable to the City's Project Manager and shall be eight (8) working days prior to the beginning of construction operations in the immediate vicinity.

In addition to the above, the Contractor shall be fully responsible for such other notifications as may be required related to necessary closures ofstreets, alleys, driveways, etc., orto unavoidable access or parking restrictions. These notifications shall apply where the closures and access or parking restrictions required in the performance of any work under this contract preclude any resident, tenant, or property owner from utilizing the premises or conducting business thereon in a reasonable and customary manner.

Additional notification to the affected businesses and residents shall be prepared by the City and distributed by the Contractor for roadway and driveway closures eight (8) working days in advance of any construction work. No removal or excavation work is allowed until the additional notification has been distributed to the affected residents and businesses. If a Contractor is unable to adhere to theirschedule as indicated on their written notification, then all the affected residents and places of business shall be re-notified of the revised schedule, in writing, as indicated above. Contractor costsfor all of the above notificationsshall be considered asincluded in the appropriate items of the Bid Proposal.

6. Notification of Utilities
The provisions of Section 402 entitled "Utilities" of the Standard Specifications shall apply. The Contractor shall contact the Underground Service Alert of Southern California (U.S.A.) at least three (3) working days in advance of the construction work.

7. Protection of the Public
The Contractor shall take such steps and precautions as his/her operations warrant to protect the public from danger, loss of life, loss of property or interruption of public services. Unforeseen conditions may arise which will require that immediate provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of Golden Gate Steel, Inc. dba Golden Gate Construction

Page 133 of 213 ends

work under the contract. Whenever, in the opinion of the City's Project Manager, a condition exists in which the Contractor has not taken sufficient precaution of public safety, protection of utilities, and/or protection of adjacent structures or property, the City's Project Manager will order the Contractor to provide a remedy for the condition. If the Contractor fails to act on the situation within a reasonable time period as determined by the City's Project Manager, or in the event of an emergency situation, the City's Project Manager may provide suitable protection by causing such work to be done and material to be furnished as, in the opinion of the City's Project Manager, may seem reasonable and necessary. The cost and expense of all repairs (including labor and materials) as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the final payment due to the Contractor.

8. Noise Restrictions
The Contractor may not operate certain power equipment, within a residential area or within a radius of five-hundred (500) feet from a residential area, except during the following times:
• From 7:00 am to 4:00 pm, Monday through Thursday
• From 6:00 am to 5:00 pm on Saturday and Sunday
In addition, the noise level from the Contractor's operationsshall not exceed eighty-five (85) dBA when measured within a one hundred (100) foot radius at any time.

9. Construction Order of Work
Work shall be scheduled so as to lessen the impact upon businesses. All construction shall conform to the latest edition of the Standard Specifications section 6-1 and 6-2 and shall proceed in a smooth, efficient, timely and continuous manner. As such, once construction is started in a work area, the Contractor will be required to work continuously in that work area until construction has been completed and the work area is open and accessible to both vehicular and pedestrian traffic in a manner approved by the City's Project Manager before the next stage of work will be allowed to begin.

Once construction is started in a work area, the Contractor shall not withdraw manpower or equipment from that work area in order to start construction in another work area if doing so, in the opinion of the City's Project Manager, delays the completion of the work presently under construction.

The Contractorshall maintain continuous accessto all residents and businesses within the project limits, including drive approaches, unless the Contractor has obtained the approval of the City's Project Manager to close either such access or drive approach.

No stockpiling of material and construction equipment on public streets or sidewalks will be permitted on this project unless approved by the City's Project Manager. Material and equipment placed on public streets, sidewalks and on the construction areas shall be used the same day.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 134 of 213 ends

10. Character of Workers
If any subcontractor or person employed by the Contractor shall fail or refuse to carry out directions of the City's Project Manager or shall appear to the City's Project Manager to be incompetent or act in a disorderly or otherwise improper manner, he/she shall be immediately discharged from the project on the request of the City's Project Manager, and such person shall not be reemployed on the work. If said individual has an ownership interest in the contracting entity, the City's Project Manager will serve written notice upon the Contractor and the Surety providing the faithful performance bond, in accordance with Section 6-7, "Termination of the Contract for Default" of the Standard Specifications, demanding complete and satisfactory compliance with the Contract.

11. Examination of Site
The Contractor is required to examine the site and judge for themselves the location. Physical conditions, substructures and surroundings of the proposed work.

12. Mobilization
The cost of all preparatory work and operations for the multiple movements of personnel, equipment,supplies, and incidentalsto the project site must be included in the various bid items, and no extra compensation will be paid to the Contractor.

13. Dust Control
Throughout all phases of construction, including suspension of work, and until final acceptance of the project, the Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling water, or other means as necessary when requested by the City. Failure of the Contractor to comply with the City's Project Manager cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation or extension of contract completion time will be allowed as a result of such suspension. The cost of furnishing and operating dust control during the construction project shall be included in the various bid items, and no extra compensation will be paid to the Contractor.

14. Best Management Practices(BMP’s)
The Contractor shall submit a copy of their Best Management Practices (BMPs) to the City Engineer for review ten (10) days prior to the beginning of any work.

The Contractor is hereby notified that specific construction practices in the Standard Specifications, Section 3-12.6.2, “Best Management Practices (BMPs)” are considered to be Best Management Practices. The Contractorshall implement and maintain such BMP’s as are relevant to the work, and as are specifically required by the Plans or Special Provisions. The Contractor shall not commence activity until the BMP submittal has been reviewed and approved.

15. Temporary Water Meter
If necessary, the Contractor shall obtain a temporary water meter from the City of Vernon Water Department by placing a deposit of $1,000. Contractor shall pay for all water used.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 135 of 213 ends

Contractor shall not relocate the service. The Contractor shall call the City of Vernon Water Department to relocate the service and will be charged fifty dollars ($50.00) for each relocation.

16. Cleaning of Site During Construction
During construction, all existing improvements, including pavement, sidewalk, curb and gutter, adjacent to the work area shall be swept free from soils, gravel, dirt or debris on a daily basis.

The Contractor is responsible for maintaining all sidewalk, curb and gutter areas within the construction zone free from loose materials at all times.

17. Sanitary Facilities
The Contractor shall furnish and maintain sufficient sanitary facilities by the worksites for the entire duration of construction activities. The cost of furnishing and maintaining sufficient sanitary facilities shall be included in the various bid items, and no extra compensation will be paid to the Contractor.

18. Final Cleaning of Site and Restoration
The Contractor shall be responsible for cleaning and restoration of all damaged existing improvements such as sidewalk, driveway, curb and gutter, and private property at no cost to the City. The Contractor shall remove all loose aggregates by sweeping all the sidewalks and gutters. The cost of furnishing and operating such sweeping after the construction of the project must be included in the various bid items, and no extra compensation will be paid to the Contractor.

19. Contractor Responsibility
The Contractor shall be responsible for the final product and shall make any quality control, adjustments and corrections necessary to obtain the final product accepted by the City's Project Manager. The Contractor shall perform process and quality control sampling and testing and exercise management control the work of his/her subcontractors, technicians and workers to ensure that the milling, transporting, spreading, compaction, and finishing processes conform to these Specifications. The City's Project Manager shall have unrestricted access to the laboratory, sampling, testing sites, and all information resulting from mix design and quality control activities.

All Quality Control testing resultsshall be submitted to the City's Project Manager on a daily basis.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 136 of 213 ends

C. Material Specifications

1. Unclassified Excavation
This section shall conform to Section 300-2 of the Standard Specifications and these Special Provisions. The cost for unclassified excavation shall be included in the unclassified excavation bid item unit price and no additional compensation to the Contractorshall be made therefor. Cost for unclassified fill if any, re-grading and re-compaction shall be included in the unit price paid for the unclassified excavation forthe said areas and no additional payment will be allowed therefor.

2. Saw-cutting
A concrete saw shall, where practicable, be used to neatly saw the edge of all existing concrete sidewalk, curb, gutter, and/or drive apron to be removed. The residue resulting from the sawcutting operations shall not be permitted to flow beyond the specific work location and shall be vacuumed concurrently with the operation.

Payment for saw-cutting concrete and asphalt pavement, concrete spandrel, drive aprons, curb, gutter or sidewalk shall be included in the unit bid prices of the various related items as specified in the Bidder's Proposal and no additional compensation for this work shall be made therefor. All work shall conform to applicable provisions of the Standard Specifications.

3. Wrought Iron Fence with Privacy Screen Mesh Cored
Fence material shall be the type or types shown on the specifications per attachment, Wrought Iron mounted on square posts (8-foot height total). Per the plans, segments of fence shall be installed:
a. Set 3” sq. post at grade in 10” dia. cored holes x 30” depth b. Set 3” sq. post atop wall in 4” dia. cored holes x 12” max. depth where occurs up to 8-foot height total
c. Set 3” sq. post outside of wall in footings at 10” cored holes, 24” set, tab & anchor up to 8-foot height total
i. One each, 1’x1’ custom opening covered with privacy screen Mesh cored – framed with no sharp edges – located at the edge of vault per Plans The cost of furnishing and installation of fence, coring, and anchoring complete in place and in working order must be included in the Wrought Iron Fence item.

4. Vehicle Access Gates
Vehicle access gates, operators, and sensor units shall be the type or types shown in this section and per the plans, for ingress & egress. Per the plans, three types of gates equipped for full function shall be furnished and installed:
a. Two each, 12’ wide swing gates. Gate operator ready. i. 4” sq. gate post set in 10” dia. cored hole 36” depth. ii. Gate frame fabricated & powder coated to City preference.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 137 of 213 ends

iii. Covered with privacy screen Mesh cored.
b. Two each, Liftmaster CSW24u swing gate operators (or similar). i. Power to location, access control, & entry system will be assisted by the City c. Two each, 14’ wide slide gates. Gate operator ready. i. V-groove track plated and anchored at concrete slab. ii. 4” sq. gate post set in 10” dia. cored hole 30” depth. iii. Gate frame fabricated & powder coated to City preference. iv. Covered with privacy screen mesh cored
d. Two each, Liftmaster CSL24u slide gate operators (or similar). i. Power to location, access control, & entry system will be assisted by the City e. One each, 13’ x 8’ manual slide gate. (Non-gate operator). i. V-groove track plated and anchored at concrete slab
ii. 4” sq. gate post set in 10” dia. cored hole 30” depth iii. Gate frame fabricated & powder coated to City preference. iv. Covered with privacy screen mesh cored
f. Contractor will let the City know where to run power, and the City crew will supply power.

Sensor units shall conform to requirements in the “Traffic Signal Control Equipment Specifications” published by the State of California Department of Transportation per the Standard Specifications, Section 700-5.8.2.2., “Sensor Units.” Sensor units shall be the type or types shown on the Plans, shall be furnished and installed per manufacturer specifications:
a. Four each, photo electric safety devices.
b. Two each, contact sensors.

The cost of furnishing and installation of swing and slide gates, Liftmasters, v-groove tracks, and sensor units complete in place and in working order must be included in the Vehicle Access Gates item.

5. Inductive Loop Detectors, Sealants, Sensor Units
The vehicle detectors shall be the type or types shown on the Plans. Detector Loops, control units, conductors and amplifiers shall conform to the requirements in the Standard Specifications, Section 700-5.8.2., “Inductive Loop Detectors.”
The traffic detector loops shall be installed per the Caltrans Standard Plan ES-5B and Standard Specifications Section 700-5.8.2. Loops and “home runs” shall be cut 4 inches deep with the stub out cut to match. Home run loops shall be spliced in series and twisted at a rate of 3 turns per foot. Cut out, deburr, and place new 4 inches deep threaded ring for stub out.

Detector loops shall be the type or types shown on the plans, shall be furnished and installed:
a. Twelve each, vehicle detector loops, cut, wrapped & sealed at surface i. 8 each, reverse loops
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 138 of 213 ends

ii. 2 each, shadow loops
iii. 2 each, exit loops
Sealants shall conform to option (a) Elastomeric Sealant or (c) Hot-Melt Rubberized Asphalt Sealant of the Standard Specifications, Section 700-5.8.2.4., “Sealants.” The cost of furnishing and installation of new traffic detector loops and “home runs” and sealants complete in place and in working order must be included in the loop bid item.

6. Pedestrian Gates
Pedestrian access gates shall be the type or types shown on the Plans, for ingress & egress. Per the plans, two types of gates shall be furnished and installed:
a. Two each, double door swing gates (72” x 96”) with transom rail above (no center post).
i. Keypad locked lever handle lock (electric, managed by City) ii. Push bar Door From inside (on secured side)
iii. Gate frame fabricated & powder coated to City preference. iv. Privacy screen mesh cored fill.
b. Two each, single door swing gates (36” x 96”) with transom rail above. i. Keypad locked lever handle lock (electric, managed by City) ii. Push bar Door From inside (on secured side)
iii. Gate frame fabricated & powder coated to City preference. iv. Privacy screen mesh cored fill.
c. 6 each, LCN 4041 door closers
i. Frame mount, opens out
The cost of furnishing and installation of pedestrian access gates, lever handle & push bar, and door closers complete in place and in working order must be included in the Pedestrian Access Gates item.

7. Chain-Link Cage
Chain-link shall be the type or types shown on the Plans, shall be furnished and installed:
a. Two each, 10’ x 16’ x 8’ chain-link enclosures at stairway with chain-link cover i. Panels, posts, and cover to match fence material and color throughout project. ii. Plated and anchored at deck offset to concrete stairwell structure, at plates, two (2) ½” x 4 ¼” anchor belts embedded 3” deep at exterior corners. iii. Adequate space to install one each, 36” wide single pedestrian swing gate per C-4 (Pedestrian Gates) with lever handle lock
iv. 3’ width landing from entrance of stairway to pedestrian gate v. Two (2) posts, one each direction lengthwise and widthwise, for cover’s structure
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 139 of 213 ends

vi. Posts along edges of cover – to be welded or fitted with connections at the recommendation of the Bidder, and to be approved by the City Project Manager The cost of furnishing and installation of chain-link enclosure, posts, and anchors complete in place and in working order must be included in the Chain-link Cage item.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 140 of 213 ends

EXHIBIT C

EQUAL EMPLOYMENT OPPORTUNITY

PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees are treated equally and are not discriminated against because of their race, religious creed, color, national origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated facilities.

B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will receive consideration for employment without regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age.

C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this Agreement, discriminated against applicants or employees because of their membership in a protected class.

D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding authority, provide copies of all of its records pertaining or relating to its employment practices, except to the extent such records or portions of such records are confidential or privileged under state or federal law.

E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is prohibited by law.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 141 of 213 ends

EXHIBIT D

CITY STANDARD PLANS

SPECIFIC FOR THIS PROJECT
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 142 of 213 ends

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 143 of 213 ends

NOTICE INVITING BIDS
for
North Parking Security Fencing Contract No. 20240259
in the
City of Vernon
One original sealed bid must be signed and submitted prior to 2:00 p.m., February 6, 2024, to the City Clerk’s Office, City of Vernon, 4305 Santa Fe Avenue, Vernon, CA 90058, (“Bid Deadline”).

All bids shall be enclosed in sealed envelopes, distinctly marked “Bid” with the title of the bid and the bidder’s name and address appearing on the outside.

Bids shall be clearly titled and should be mailed or delivered in person before 2:00 p.m., on the Bid Deadline. LATE SUBMITTALS WILL NOT BE ACCEPTED. Bids will be opened in the City Clerk’s Office at 2:00 p.m. on Tuesday, February 6, 2024. At the bid opening, the City Clerk shall open bid packages and acknowledge the receipt of Bids. Once all Bid Packages are opened and announced, the contents (collectively, the “Completed Bid Forms” and the uncompleted forms, the “Bid Forms”) will be made available for public review. Except as set forth in Paragraph 22 (“Public Records”), the Completed Bid Forms, once removed from the Bid Packages by the City Clerk, will be a matter of public record.

Bid Documents, Plans and Specifications are available at no charge at www.cityofvernon.org/planetbids.

Pre-Bid Meeting:

A pre-bid meeting to answer any questions regarding the project plans and specifications is scheduled for 10:00 a.m. on Wednesday, January 24, 2024, in the Public Works Department, 4305 Santa Fe Avenue, Vernon, California. This meeting is to answer any questions regarding the project plans and specifications.

Attendees must adhere to the State and local guidelines regarding COVID-19, including applicable industry guidelines for construction sites. Attendance is mandatory.

City of Vernon Contact Person: Public Works Department
Attention: Carlos Velazquez, Engineering Aide
Phone: (323) 583-8811 ext. 526
Email: [email protected]
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 144 of 213 ends

Mandatory Qualifications for Bidder and Designated Subcontractors:

A Bid may be rejected as non-responsive if the Bidder fails to meet the essential requirements for qualification.

General Scope of Work:

Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work in the Bid is defined in the Project Drawings and Specifications and will generally include: The project consists of the furnishing and installation of 8-ft high fencing, vehicle access gates, detection loops, pedestrian access gates, and staircase enclosures for the north parking structure of City Hall.

The work shall be done in accordance with City Contract No. 20240259. “Greenbook” Standard Specifications for Public Works Construction (2021 Edition), State of California Department of Transportation (Caltrans) Standard Plans (2022 Edition) and the State of California Department of Transportation (Caltrans) Standard Specifications (2018 Edition).In the event of any conflicts, refer to the Procedure of Contract Documents” contained in General Conditions, Section 1.10.

Mandatory Qualifications for Bidder and Designated Subcontractors:

A Bid may be rejected as non-responsive if the Bid fails to document that Bidder meets the essential requirements for qualification. As part of the Bidder’s Statement of Qualifications, each Bid must establish that:

Bidder satisfactorily completed at least three (3) prevailing wage public contracts in California; each comparable in scope and scale to this Project, within three (3) years prior to the Bid Deadline and with a dollar value in excess of the Bid submitted for this Project. In addition, if the Bidder intends to self-perform the concrete and asphalt work for v-groove track, detection loop installation, and reconstruction,. Bidder shall satisfy the mandatory qualifications described in the Specialty Contractor Statement of Qualifications applicable to such Work and submit the completed forms with the Bid.

Subcontractors listed for the concrete and asphalt work for v-groove track, detection loop installation, and reconstruction work must satisfy the mandatory qualifications described in the Specialty Contractors’ Statements of Qualifications applicable to the Work to be performed by each Subcontractor and Bidder must submit the completed forms with the Bid.

Other Bidding Information:

1. Contract Time: This Work must be completed within 90 calendar days from the date of commencement as established by the City’s written Notice to Proceed.

2. Amount of Liquidated Damages: $250 per calendar day.

3. Bidding Documents. Bids must be made on the Proposal Form contained herein.

4. Engineer’s Estimate. An Engineer’s Estimate of the cost of construction of this Work has Golden Gate Steel, Inc. dba Golden Gate Construction

Page 145 of 213 ends

been prepared. Said estimate is in the range of $225,000 to $240,000.

7. Acceptance or Rejection of Bids. The City reserves the right to reject any and all bids, to award all or any individual part/item of the bid, and to waive any informalities, irregularities or technical defects in such bids and determine the lowest responsible bidder, whichever may be in the best interests of the City. No late bids will be accepted, nor will any oral, facsimile or electronic bids be accepted by the City.

8. Contractor’s License. At the time of the Bid Deadline and at all times during performance of the Work, including full completion of all corrective work during the Correction Period, Contractor must possess a California contractor’s license or licenses, current and active, of the classification required for the Work, in accordance with the provisions of Chapter 9, Division 3, Section 7000 et seq. of the Business and Professions Code. In compliance with Public Contract Code Section 3300, the City has determined that the Bidder must possess the following license(s) : Class A, General Engineering Contractor License from California License Board. The Bidder will not receive a Contract award if at the time of submitting the bid, the Bidder is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active. If the City discovers at the time of the Bid Deadline that Contractor is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active, the City may reject the Bid, cancel the award, declare the Bid Bond as forfeited, keep the Bid Bond’s proceeds, and exercise any one or more of the remedies in the Contract Documents in addition to those provided by law.

9. Subcontractors’ Licenses and Listing. Bidders must list each Subcontractor whom the Bidder must disclose under Public Contract Code Section 4104 (Subcontractor Listing Law), and the Bidder must provide all of the Subcontractor information that Section 4104 requires (name, address, license number, public works contractor registration number issued pursuant to Labor Code Section 1725.5, and portion of the Work). An inadvertent error in the license number or public works contractor registration number will not be considered nonresponsive if corrected within 24 hours after the bid opening. In addition, the City requires the Bidder to list the dollar value of each Subcontractor’s labor or services. The City reserves the right to review and disqualify any proposed Subcontractor. The City’s disqualification of a Subcontractor does not disqualify a Bidder. In such case, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an adjustment of the Bid Amount. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor’s license must be current and active for the portion of the Work listed and shall hold all specialty certifications required for such Work.

10. Permits, Inspections, Plan Checks, Governmental Approvals, Utility Fees and Similar Authorizations.

Unless specified otherwise, all Governmental Approvals and Utility Fees shall be obtained and paid for by Contractor and will be reimbursed based on Contractor’s actual direct cost without markup.

11. Bid Forms and Security: Each Bid must be made on the Bid Forms obtainable at the Public Works Department. Each Bid shall be accompanied by a cashier’s check or certified check drawn on a solvent bank, payable to “City of Vernon,” for an amount equal to ten percent (10%) of the total maximum amount of the Bid. Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%) of the total maximum amount of the Bid may accompany the Golden Gate Steel, Inc. dba Golden Gate Construction

Page 146 of 213 ends

Bid. Said security shall serve as a guarantee that the successful Bidder will, within fifteen (15) calendar days after the date of the award of the contract, enter into a valid contract with the City for said Work in accordance with the Contract Documents.

12. Bid Irrevocability. Bids shall remain open and valid for ninety (90) calendar days after the Bid Deadline.

13. Substitution of Securities. Pursuant to California Public Contract Code Section 22300, substitution of securities for withheld funds is permitted in accordance therewith.

14. Prevailing Wages. This Project is a “public work” as defined in California Labor Code Section 1720. Contractor awarded this Contract and all Subcontractors of any tier shall not pay less than the minimum prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Work. The Director of Industrial Relations of the State of California, pursuant to the California Labor Code, and the rates determined by the California Director of Industrial Relations are available online at www.dir.ca.gov/DLSR/PWD/.

15. Payroll Records. Pursuant to SB 854, Contractor and any Subcontractors shall furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement).

16. Registration with the Department of Industrial Relations (DIR). No contractor or subcontractor may be listed on a bid proposal for a public works project unless currently registered and qualified (including payment of any required fee) with the DIR pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless currently registered and qualified (including payment of any required fee) with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the DIR.

Carlos Fandino
City Administrator
Dated: ___________ (Approved as to form by the City Attorney’s Office) Published: _______
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 147 of 213 ends

City of Vernon
Instructions for Bidders
Project: North Parking Security Fencing
for the Department of Public Works
City personnel with whom prospective bidders will deal with are:

Carlos Velazquez, Engineering Aide, Department of Public Works, 4305 Santa Fe Avenue, Vernon, CA 90058 (323) 583-8811 ext. 526
Bid opening date and time: 2:00 p.m. on Tuesday, February 6, 2024. (“Bid Deadline”).

Bids will be received and opened at the Office of the City Clerk, 4305 Santa Fe Avenue, Vernon, CA 90058.

The bid must be received by the City Clerk’s Office prior to the time set for bid opening. A bid received by the City Clerk’s Office after the time set for the bid opening is a non-responsive bid and shall not be considered.

GENERAL BID REQUIREMENTS
To be considered, a bidder must strictly follow the format for bids in the specifications. Bids must be binding and firm. Any bids may be withdrawn before bid opening, but bids shall remain open and valid for ninety (90) calendar days after the Bid Deadline.

1. CONTRACTORS LICENSE
The Bidder must possess a valid State of California Contractors License and must list type in the classification(s) specified in the Notice Inviting Bids at the time of the Bid Deadline and at all times during the performance of the Work, except as otherwise provided in California Business and Professions Code Section 7028.15.

2. INTERPRETATION OF BIDDING DOCUMENTS, SPECIFICATIONS AND

ADDENDA
A. If any Bidder contemplating submitting a Bid is in doubt as to the true meaning of any part of the Bidding Documents, or who finds discrepancies, errors or omissions therein or who finds variances in any of the Bidding Documents with applicable law, such Bidder shall at once submit a written request for an interpretation or correction thereof to the City’s representative identified in the Notice Inviting Bids, or other designated individual. All Bidders shall submit such written requests to City not less than ten (10) calendar days prior to the Bid Deadline. The person or entity submitting the request shall be responsible for its prompt delivery to City’s Contact Person identified in the Notice Inviting Bids.

Any interpretation or correction will be made only by Addendum issued by the City and a copy of such Addendum will be delivered to all Interested Bidders of record.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 148 of 213 ends

Any Addenda so issued must be acknowledged in the Bid and the cost of performing Work described in the Addenda shall be included in the Bid. Bidder’s failure to acknowledge receipt of all Addenda may result in rejection of the Bid as nonresponsive. No person is authorized to render an oral interpretation or correction of any Bidding Documents and no Bidder may rely on any such oral interpretation or correction issued by the City. The City shall not be responsible for any other explanation or interpretation of the Drawings or Specifications, or for any oral instructions. City reserves the right to extend the Bid Deadline by issuing an Addendum to Interested Bidders no later than 72 hours prior to the Bid Deadline.

Bidders shall use complete sets of Bidding Documents in preparing Bids; City shall not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

B. Addenda will be made available for inspection at
www.cityofvernon.org/planetbids. Each Bidder shall ascertain prior to submitting a Bid that the Bidder has received all Addenda issued and the Bidder shall acknowledge their receipt in the Bid.

3. OBTAINING DRAWINGS AND DOCUMENTS
Bidder may secure Bidding Documents only from the location specified in the Notice Inviting Bids. City will maintain a list of persons who obtained a copy of these Specifications (“Interested Bidders”). Only Interested Bidders will receive Addenda, if so issued.

4. BID FORMS – SUBMITTAL
A. The Bids shall be made on the forms provided herein with all blank spaces properly filled in.

B. The phraseology shall not be changed, and no additions shall be made to the items mentioned herein. Unauthorized conditions, exemptions, limitations, or provisions attached to a Bid will render it informal and may cause its rejection. All forms requiring specific information shall be completed with all applicable information for a Bid to be considered responsive.

C. Include all Bid Forms, properly executed, and intact on forms provided. Enclose the Bid Forms in a sealed envelope; type or print on the envelope "BIDS for" followed by the title and Specification Number and the date and time of the Bid Deadline, and the Bidder's name and address. The envelope may be mailed, hand delivered, or delivered by courier or package delivery service.

D. One Original Bid shall be hand delivered, delivered by courier or package delivery service to the Office of the City Clerk, City of Vernon, 4305 Santa Fe Avenue, Vernon, CA 90058.

E. Bids received after the Bid Deadline or at any place other than the Office of the Golden Gate Steel, Inc. dba Golden Gate Construction

Page 149 of 213 ends

City Clerk will not be considered.

5. BID FORMS – AUTHORIZED SIGNATURES
A. The full name, business address, zip code, and business telephone number, with area code of the individual, partnership, joint venture, or corporation submitting the Bid shall be typewritten or legibly printed on the Bid Forms. The Bidder shall sign the form with his/her usual wet ink signature.

B. Sole Proprietorship: An individual shall sign.

C. Partnership (General or Limited): A partner shall sign for a partnership; the partner shall give the names and addresses of all partners.

D. Corporation: An officer shall sign for a corporation. The corporate name must be attested by the corporate seal. The names and titles of the president and all officers of the corporation who are authorized to sign the Bid Forms must be listed in an authenticated Incumbency Certificate signed by the corporate secretary. A signature other than a corporate officer’s will be accepted only if an authenticated Incumbency Certificate is attached.

E. Joint Venture: Bidders shall use the appropriate section(s) listed above in B-D, based on their applicable situation.

6. BID FORMS – SCHEDULE OF BID PRICES
A. The Bidder shall include in his/her Bid price(s) any and all expense or costs that may be necessary to complete the project in accordance with the requirements of the Contract. The cost of all mobilization, preparatory work and operations for the multiple movements of personnel, equipment, supplies, and incidentals to the various project sites must be included in the various bid items, and no extra compensation will be paid to Contractor.

B. The Bidder shall state for each item on the Schedule of Bid Prices form, in clearly legible figures, the Base Bid, the alternates, and the unit price and item total or lump sum, as the case may be, for which he/she proposes to supply labor, materials, and equipment and to perform the Work. Bids must not contain any erasures, interlineations, strike-throughs or other corrections unless the same are suitably authenticated by affixing in the margin immediately opposite such erasure or correction the initials of the person(s) signing the Bid. If any Bid, or portion thereof, is determined by the City to be illegible, ambiguous or inconsistent, City may reject such a Bid as being non-responsive.

C. In the case of a unit price item, the amount set forth, as the item total shall be the product of the estimated quantity times the unit price Bid. In the event of a discrepancy between the unit price Bid and the item total, the unit price shall prevail; however, if the unit price is ambiguous, unintelligible, or uncertain for Golden Gate Steel, Inc. dba Golden Gate Construction

Page 150 of 213 ends

any cause, or is omitted, or is the same amount as the entry for the item total, then the item total shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Where so indicated by the makeup of the Bid Form, sums shall be expressed in both words and figures, and in case of discrepancy between the two, the amount written in words shall govern.

D. All requested Alternates, if any, shall be Bid. See the Schedule of Bid Prices for more information and the list of Bid Alternates, if any. If no change in the Base Bid is required, enter “No Change.”

7. BID SECURITY
A. Each Bid shall be accompanied by cash or a cashier’s check or a certified check, drawn on a responsible bank doing business in the United States payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as a principal and a California admitted surety company (as defined by California Code of Civil Procedure §§995.120 and 995.311) as surety (“Bid Security”).

B. All bonds must be issued by a California admitted surety insurer with the minimum A.M Best Company Financial strength rating of “A:VII” or better. Bonds issued by a California admitted surety not listed on Treasury Circular 570 will be deemed accepted unless specifically rejected by the City. Bonds issued from admitted surety insurers not listed in Treasury Circular 570 must be accompanied by all documents enumerated in California Code of Civil Procedure Section 995.660. All such bonds must be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California, all copies of the bonds must be countersigned by a California representative of the surety. The signature of the person executing the bond on behalf of Surety must be acknowledged by a Notary Public as the signature of the person designated in the power of attorney.

C. Bid Security shall be in an amount not less than 10% of the Base Bid. Any Bid submitted without Bid Security will be rejected as non-responsive. The Bid Security shall be given as a guarantee that the successful Bidder will execute the Contract and will provide the insurance, bonds and other required forms within fourteen (14) calendar days after award of the Contract. Bidders will be entitled to return of Bid Security except when a successful Bidder forfeits its Bid Security. A forfeit may occur, for example, if the successful Bidder withdraws its Bid prior to the expiration of ninety (90) calendar days after award of the Contract; attempts to withdraw its Bid when the requirements of Public Contract Code § 5101 et seq. are not met; or refuses or fails to execute the Contract and provide the required bonds, insurance or certificates within fourteen (14) calendar days after award of the Contract. In any one or more of these events, if City awards the Contract for the Work to the next lowest responsible Bidder, the amount of the original lowest Bidder’s security shall be applied to the Contract Price differential between the lowest Bid and the second lowest Bid. Any surplus will be returned to the original Golden Gate Steel, Inc. dba Golden Gate Construction

Page 151 of 213 ends

lowest Bidder. If the City rejects all other Bids presented and re-advertises, the lowest Bidder’s Bid Security may be used to offset the City’s cost of re-advertising and receiving new Bids. In that case, the surplus if any, will be returned to the original lowest Bidder.

D. The Bid Security shall be held for ninety (90) calendar days after the award of the Contract or until posting by the successful Bidder of the payment and performance bonds, proof of insurance, return of executed copies of the Contract and necessary certification(s), whichever first occurs, after which time the Bid Security will be returned to all Bidders.

E. If a Bid Bond is to be submitted, Bidder shall use the form entitled "Bid Bond" contained in the Bidding Documents, which Bid Bond shall be properly executed and acknowledged by the Bidder and by a corporate surety authorized to transact such business in the State of California.

F. Any alteration of said form of Bid Bond, or imperfection in the execution thereof, as herein required, will render it informal and may, at the option of the City, result in the rejection of the Bid under which the Bid Bond is submitted.

8. BIDDER'S AND SPECIALTY CONTRACTORS’ STATEMENTS OF

QUALIFICATIONS
A. Each Bidder shall be required to complete, execute and submit with its Bid, the form entitled "Bidder's Statement of Qualifications." In addition, if the Bidder intends to have sub-contract work, Bidder shall satisfy the mandatory qualifications described in the Specialty Contractors’ Statements of Qualifications applicable to such Work and submit the completed forms with the Bid. Subcontractors listed for the concrete and asphalt work for v-groove track, detection loop installation, and reconstruction work must satisfy the mandatory qualifications described in the Specialty Contractor or Subcontractor Statement of Qualifications applicable to the Work to be performed by each Subcontractor and Bidder must submit the completed forms with the Bid. Notwithstanding the provisions of Paragraph 22 herein, the Bidder’s Statement of Qualifications and the Specialty Contractor or Subcontractor Statement of Qualifications) shall not be public records. All information required by a Bidder’s or Specialty Contractor Statement of Qualifications shall be completely and fully provided. If no information is to be filled in a blank space, then write "none." Any Bid not accompanied by a Bidder’s Statement of Qualifications and Specialty Contractor or Subcontractor Statement of Qualifications form completed with all information required may render the Bid non-responsive. If the City determines that any information provided by a Bidder in the Bidder’s or Specialty Contractors’ Statement of Qualifications is false or misleading, or is incomplete so as to be false or misleading, the City may reject the Bid submitted by such Bidder as being non-responsive.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 152 of 213 ends

B. A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily perform fully the requirements of the contract documents. In selecting the lowest responsible Bidder, consideration will be given not only to the Bidder’s financial standing but also to the general competency of the Bidder for the performance of the work covered by the Bid including, but not limited to, the experience of the Bidder in construction of public buildings for public agencies. By submitting a Bid, each Bidder agrees that the City, in determining the successful Bidder and its eligibility for the award, may consider the Bidder’s experience with similar types of construction projects and facilities, conduct and performance under other contracts, financial condition, reputation in the industry, and other factors which could affect the Bidder’s performance of the work.

9. DESIGNATION OF SUBCONTRACTORS
A. Subcontractor Listing. On the Designation of Subcontractors form, the Bidder shall list each Subcontractor whom the Bidder must disclose under the Subletting and Subcontracting Fair Practice Act, Public Contract Code Section 4104. The Bidder shall provide: each Subcontractor’s name, the trade and type of work that the Subcontractor will perform, the location (address) of the Subcontractor’s place of business, each Subcontractor’s license number, each Subcontractor’s public works contractor registration number, and the dollar value of each Subcontractor’s labor or services. If additive Alternate Bid Items are included in the Bidding Documents, the Bidder shall identify each Subcontractor performing additive Alternate Bid Items, when such Work or the combination of base Contract Work and Alternate Work exceeds one-half of one percent of the total Bid Amount.

B. Subcontractors’ Licenses. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor shall possess a current and active California Contractor’s license appropriate for the portion of the Work listed for such Subcontractor and hold all specialty certifications required for such Work.

C. Disqualification of a Subcontractor. The City has the right to review the suitability and qualifications of any Subcontractor proposed by the Bidder. As part of this review, the City may request a Bidder to submit additional information about one or more of the listed Subcontractors including, but not limited to a statement detailing the Subcontractor’s experience with pertinent information as to similar projects and other evidence of the Subcontractor’s qualifications. If requested, the Bidder shall provide the information to the City within the time specified in the City’s written request. After due investigation, if the City has a reasonable objection to any proposed Subcontractor, the City may, before giving the notice of award, require the apparent successful Bidder to submit an acceptable substitute.

The City’s disqualification of a Subcontractor does not disqualify a Bidder.

However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor without an adjustment of the Bid Price.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 153 of 213 ends

D. Work of Subcontractors. The organization or arrangement of the Specifications and Drawings do not limit the extent of the Work for the Contract Documents.

Accordingly, all Bidders are encouraged to disseminate all of the Specifications, Drawings and other Contract Documents to all persons or entities submitting subbids to the Bidder. The omission of any portion or item of Work from the Bid or from sub-bids, which is reasonably inferable from the Contract Documents, will not be a basis for adjustment of the Contract Price or the Contract Time.

E. Ineligible Subcontractors. The successful Bidder is prohibited from performing Work on the Project with any Subcontractor who is ineligible to perform work on a public works project pursuant to California Labor Code Sections 1777.1 or 1777.7. In submitting its Bid, the Bidder certifies that it has investigated the eligibility of each and every listed Subcontractor and has determined that none is ineligible to perform work pursuant to the above code provisions.

10. CONTRACTOR’S AFFIDAVIT OF NON-COLLUSION
An Affidavit of Non-Collusion in the form provided by the City shall be signed under penalty of perjury, certifying that the Bid is not the result of and has not been influenced by collusion. Bidder shall submit this form with its Bid. Any Bid made without such affidavit, or believed to be made in violation of the requirements set forth in the affidavit form, may be rejected.

11. INSURANCE REQUIREMENTS
The Bidder shall submit to its insurance company or insurance agent the Insurance Requirements in this Specification and the Contract Documents. The insurance company’s underwriter or agent must complete the Insurance Requirements documentation which states that the insurer’s underwriter or agent will furnish the City with the required insurance documents within fourteen (14) days after the Bidder’s having been notified of the Contract’s award. The Bidder shall submit this form with its Bid. Any Bid made without this statement, or made with an incomplete statement, may be rejected.

12. EXAMINATION OF DRAWINGS, SPECIFICATIONS, AND SITE OF WORK A. The Bidder shall examine carefully the site of the Work contemplated and the Drawings and Specifications. The submission of a Bid will be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of Work to be performed and materials to be furnished, the difficulties to be encountered, and to the requirements of the Drawings, Specifications, and other Contract Documents. The Bidder shall ascertain the locations of the existing utility services, and other underground facilities, and provide for carrying out its operations so as to cause the minimum possible inconvenience to the occupants of properties along any streets affected. All Work and costs involved in the safeguarding of the properties of others shall be at the expense of the Bidder to whom the Contract may be awarded.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 154 of 213 ends

B. The Bidder hereby certifies that it has examined the local conditions, has read each and every clause of the Contract Documents, and that it has included all costs necessary to complete the specified Work in its Bid prices, and the Bidder agrees that if it is awarded the Contract, it will make no claim against the City based upon ignorance of local conditions or misunderstanding of any of the provisions of the Contract. Should the conditions turn out otherwise than the Bidder anticipated, the Bidder agrees to assume all risks incident thereto.

13. PRICES AND PAYMENTS
Approximate quantities listed in the Schedule of Bid Prices are estimates given for comparing Bids, and no claim shall be made against the City for excess or deficiency therein, actual or relative. Payment at the prices agreed upon will be in full for the completed Work and will cover materials, supplies, labor, tools, equipment, and all other expenditures incident to a satisfactory compliance with the Contract, subject to all applicable provisions in the Contract and General Conditions.

14. PERMIT FEES
If provided in the General Conditions, Contractor shall be reimbursed for the actual direct cost of all Permit Fees, as defined in Paragraph 1.01 and addressed in 1.03 of the General Conditions. Bidder shall exclude the cost of Permit Fees from Bidder’s Base Bid sum; Base Bid sum shall include the cost of administration and coordination for all Governmental Approvals and Utility Fees.

15. SUBSTITUTIONS
No requests for substitution of any material, device, product, equipment, fixture, form, or type of construction shall be considered by City prior to award of the Contract. Bidders shall submit all requests for substitution and substantiating data, within fifteen (15) calendar days from the date of the Notice to Proceed. Bidder shall refer to the appropriate provisions of the General Conditions for additional information regarding substitutions.

Authorization of a substitution is solely within the discretion of the City.

16. RETURN OF IMPROPER BIDS
Bids submitted after the Bid Deadline are non-responsive and shall be returned to the Bidder unopened. Oral, telephonic, telegraphic, facsimile or electronically transmitted Golden Gate Steel, Inc. dba Golden Gate Construction

Page 155 of 213 ends

Bids shall not be considered unless the Notice Inviting Bids expressly permits such means of transmittal.

17. WITHDRAWAL OF BIDS
Bidder may withdraw its Bid either personally or by written request any time prior to the scheduled Bid Deadline by notice to the City’s Contact Person designated in the Notice Inviting Bids. If such notice is written, it shall be signed by the Bidder and shall be datestamped and time-stamped by the City upon receipt. Withdrawn Bids may be resubmitted before the Bid Deadline provided that they are in full conformance with these Instructions to Bidders. Once submitted, all Bids are irrevocable, except as otherwise provided by law.

Requests for withdrawal of Bids after the Bid Deadline shall be made only in accordance with California Public Contract Code § 5100, et seq. Bidder agrees by submitting a Bid that such Bid shall remain open, is irrevocable, and may not be modified, withdrawn, or cancelled for a period of ninety (90) days after award of the Contract.

18. OPENING AND EVALUATION OF BIDS
A. Bid Opening and Tabulation. The Bids shall be opened and read in public after the Bid Deadline has expired at the time and location listed in the Notice Inviting Bids. A tabulation of all Bids received will be available for public inspection at the Office of the Public Works Department, 4305 Santa Fe Avenue, Vernon, CA 90058 during regular business hours for a period of not less than thirty (30) calendar days following the Bid Deadline. The City reserves the right to accept or reject any or all Bids and be the sole judge regarding the suitability of the products, services or supplies offered; and/or to waive any irregularities or informalities in any Bids or in the bidding process. The City further reserves the right to purchase all or fewer than all items or quantities of each item listed in the Bidding Documents. The award of the Contract, if made by the City, shall be to the lowest responsive and responsible Bidder. If Bid Alternate Items are called for, the lowest Bid shall be determined according to Paragraph 20 below.

B. Evaluation of Bids.

1. Mandatory Qualifications. A Bid shall be rejected as non-responsive if the Bidder fails to document in the Bid that Bidder meets the essential requirements for qualification described in the Notice Inviting Bids. As part of the Bidder’s Statement of Qualifications each Bidder must establish that it, as the current entity: (1) has successfully completed at least three (3) similar projects involving similar work within the last three (3) years with a cost equal to or in excess of the Bidder’s Bid; and (2) has successfully completed at least three (3) public works projects. The City’s disqualification of a Subcontractor listed for the does not disqualify a Bidder. However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 156 of 213 ends

and qualified Subcontractor without an adjustment of the Bid Price.

2. Responsive Bid. A responsive Bid is a Bid which conforms, in all material respects, to the Bidding Requirements and Contract Documents.

3. Responsible Bidder. A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily perform fully the requirements of the Contract Documents.

4. Competency of Bidders. In selecting the lowest responsible Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the Work covered by the Bid including, but not limited to, the experience of the Bidder in construction of public works for public agencies. By submitting a Bid, each Bidder agrees that the City, in determining the successful Bidder and its eligibility for the award, may consider the Bidder’s experience with similar types of construction projects and facilities, conduct and performance under other contracts, financial condition, reputation in the industry, safety record and protocols and other factors which could affect the Bidder’s performance of the Work.

19. AWARD OF CONTRACT
The City reserves the right to reject any or all Bids and to waive any or all information or technical defects, as the interest of the City may require. Award of Contract or rejection of Bids will be made by the City within ninety (90) calendar days following the Bid Opening.

20. BASIS OF AWARD
A. A Contract will be awarded to the lowest responsive and responsible Bidder meeting all requirements set forth in these Bidding Documents.

The City will award the Contract based on the lowest Base Bid including all alternates.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 157 of 213 ends

B. City reserves the right in its sole discretion to select any, all, or none of the Bid Alternates at the time of award of the Contract, regardless of whether such Bid Alternates were used in the analysis to determine the lowest Bid.

21. EXECUTION OF CONTRACT
Within fourteen (14) calendar days after being notified by City that it has been awarded the Contract, Contractor shall deliver to the City the following documents:

A. One executed Contract in the form included herein, properly executed by Contractor and, if Contractor is a corporation, evidence of its corporate existence and that the persons signing the Contract are authorized to do so. All signatures must be notarized.

B. Properly executed copies of the (a) Performance Bond, (b) Labor and Material (Payment) Bond and (c) Maintenance Bond in accordance with the requirements set forth in Article 13 of the General Conditions and in the form shown on Exhibits 1, 2 and 3 attached thereto. All signatures must be notarized.

C. Properly executed policies of all of the following: (a) the Commercial General Liability Insurance, (b) the Automotive Liability Insurance, and (c) Professional Liability, if required, and (e) the corresponding endorsements for each policy in accordance with the requirements set forth in Article 12 of the General Conditions.

In the event that the fourteenth calendar day falls on Saturday, Sunday, a legal holiday for the State of California, or on days when City Hall is closed, the aforesaid documents shall be delivered by the following working day.

After receipt of said documents within said time period or any extension thereof granted by the City, the City shall execute the Contract and return a fully executed copy to Contractor for its files.

22. PUBLIC RECORDS
City seeks to conduct its business openly. Except as set forth in paragraph 8.A., upon Golden Gate Steel, Inc. dba Golden Gate Construction

Page 158 of 213 ends

opening, all Bids shall become a matter of public record and shall be regarded as public, with the exception of those elements of each Bid that are identified by the Bidder and plainly marked as “trade secret,” “confidential,” or “proprietary,” including any Statement of Qualifications and financial statements to be submitted by Bidders. Each element of a Bid which a Bidder desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents, or other, non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If City receives a request from a third party to make a Bid available for inspection and copying, the City will notify the Bidder of the request. If a Bidder instructs the City that the information is not to be released, City will withhold the information, provided, the Bidder expeditiously seeks a protective order from a court of competent jurisdiction to prevent such release. If disclosure is required under the California Public Records Act or otherwise by law (despite the Bidder’s request for confidentiality), the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.

Bidder shall indemnify, defend (including Bidder’s providing and paying for legal counsel for City), and hold harmless City, its officers, agents, employees, and representatives from and against all liability, claims, suits, demands, damages, fines, penalties, costs, or expenses arising out of or alleging City’s refusal to publicly disclose one or more records that Bidder identifies as protectable, or asserts is protectable.

23. PREVAILING WAGE RATES AND EMPLOYMENT OF APPRENTICES A. Prevailing Wage Rates. The Bidder and all Subcontractors shall utilize the relevant prevailing wage rate determinations in effect on the first advertisement date of the Notice Calling for Bids in preparing the Bid Proposal and all component price quotations, provided, however, that when Davis Bacon wage rates apply, such rates are subject to increase by written notice, issued by Addendum not less than 10 calendar days before the Bid Deadline. Pursuant to California Labor Code Section 1770 et seq., the Director of the Department of Industrial Relations of the State of California and the United States Secretary of Labor have determined the general prevailing wage rates in the locality in which the Work is to be performed. Said rate schedules are available from the City at its Public Works Department which shall be made available to any interested party upon request; or on the Internet at www.dir.ca.gov/DLSR/PWD/. The wage rate for any classification not listed, but which may be required to execute the Work, shall be commensurate and in accord with specified rates for similar or comparable classifications for those performing similar or comparable duties. To comply with California Labor Code Section 1773.2, Contractor shall post, at appropriate and conspicuous locations on the job site, a schedule showing all applicable prevailing wage rates and shall also comply with the requirements of California Labor Code Sections 1773 et seq.

B. Apprenticeship Committee Contract Award Information. Pursuant to California Labor Code § 1777.5 and Title 8 of the California Code of Regulations § 230, Contractor and Subcontractors of any tier who are not already approved to train by Golden Gate Steel, Inc. dba Golden Gate Construction

Page 159 of 213 ends

an apprenticeship program sponsor shall, within ten (10) calendar days of signing the Contract or subcontract, as applicable, but in any event prior to the first day in which Contractor or Subcontractor has workers employed on the Project, submit the Public Works Contract Award Information form (DAS Form 140) to the appropriate local apprenticeship committees whose geographic area of operation include the area of the Project and who can supply apprentices to the Project. City reserves the right to require Contractors and Subcontractors to submit a copy of said forms to the City.

C. Statement of Employer Fringe Benefit Payments. Within five (5) calendar days of signing the Contract or subcontract, as applicable, the Statement of Employer Payments (DLSE Form PW 26) shall be completed for each Contractor and Subcontractor of any tier who pays benefits to a third party trust, plan or fund for health and welfare benefits, vacation funds or makes pension contributions. The form must contain, for each worker classification, the fund, plan or trust name, address, administrator, the amount per hour contributed and the frequency of contributions. Training fund contributions shall also be reported in this form. City reserves the right to require Contractors and Subcontractors to submit a copy of said forms to the City.

D. Notice to Subcontractors. Bidders shall notify all potential Subcontractors submitting price quotations for portions of the Work of the requirements concerning payment of prevailing wage rates, payroll records, hours of Work, and employment of apprentices.

24. REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)
No contractor or subcontractor may be listed on a bid proposal for a public works project unless currently registered and qualified (including payment of any required fee) with the DIR pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless currently registered and qualified (including payment of any required fee) with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the DIR.

25. SPECIAL CITY REQUIREMENTS
Special City forms and their instructions are an integral part of these specifications and failure to submit same may be grounds, in the sole discretion of the City, for rejection of any Bidder.

A. Prevailing Wage Where Applicable. Upon request, certified payroll documents shall be provided to the City.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 160 of 213 ends

B. Equal Employment Opportunity in Contracting. The City of Vernon is committed to a policy of equal opportunity in contracting. Qualified firms including small businesses and businesses owned by women, minorities, and disabled persons are encouraged to submit bids or proposals. Contractors expressly agree to comply with the City's ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting the Contract. Contractor certifies and represents that during the performance of this Contract, it and any other parties with whom it may subcontract shall adhere to equal employment opportunity practices to assure that applicants, employees and recipients of service are treated equally and are not discriminated against because of their age not discriminated against because of their race, religion, religious belief, color, national origin, citizenship, ancestry, disability, sex, age, medical condition, pregnancy, sexual orientation or marital status. Contractor certifies that it will not maintain any segregated facilities.

Contractor shall comply with all applicable Federal and California laws including, but not limited to, the California Fair Employment and Housing Act (California Government Code Section 12900, et seq.), California Labor Code Section 1735, and The Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.).

Contractor shall require like compliance by all Subcontractors employed on the Work.

26. BID PROTEST PROCEDURES
A. Any Bidder submitting a Bid directly to the City and eligible for award of the Contract may file a protest if the Bidder complies with all of the following requirements and conditions:

1. The Bid protest is in writing;

2. A protest based upon alleged defects or improprieties in the Contract Documents is filed with the City prior to the Bid Deadline;

3. All other protests are to be filed and received by the City no more than five (5) calendar days following the City’s notice of intent to award the Contract; and

4. The written Bid protest sets forth, in detail, all grounds for the Bid protest, including without limitation: all facts, supporting documentation, legal authorities, and argument in support of the grounds for the Bid protest. All factual contentions must be supported by competent, admissible, and credible evidence.

B. Any matters not set forth in the written Bid protest will be deemed waived. Any Bid protest not conforming to the foregoing requirements and conditions will be rejected by the City as invalid.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 161 of 213 ends

C. Bid Dispute Indemnification. In the event of a Bid dispute based upon the Bidder’s submission of this Bid and the City acceptance of same, the Bidder shall indemnify, defend (with counsel acceptable to City), and hold harmless the City, its City Council members, employees, and agents from liability, claims, demands, damages, and costs arising therefrom if such dispute or action arises solely upon the award of a Contract in compliance with federal, state, and local laws. [END OF DOCUMENT]
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 162 of 213 ends

/:'

BIDDER'S PROPOSAL
The undersigned submits this Bid in response to the Notice Inviting Bids issued by the City to construct the Work of the following Project in accordance with the Contract Documents:

PROJECT: North Parking Security Fencing, Contract No. 20240259 A. Enclosed herewith and by this reference incorporated herein and made a part of this Bidder's Bid are the following completed forms:

1. Bidder's Proposal

2. Schedule of Bid Prices

3. Incumbency Certificate

4. Bid Security in the following form (check one):

D Cashier's Check 0 Certified Check

5. Bidder's Statement of Qualifications

6. Experience Form
� Bid Bond

7. Statement of Violations of Federal, State or ocal Law, if applicable

8. Specialty Contractor Statement of Qualifications

9. Contractor Safety Questionnaire

10. Designation of Subcontractors

11. Contractor's Affidavit of Non-Collusion

12. Insurance Requirements Affidavit

13. Statement of Disqualification or Debarment

14. Pre-Bid Site Inspection Certification
□ cash
B. Acknowledgment of Addenda. The Bidder shall acknowledge the receipt of all Addenda by attaching a signed copy of all Addenda, and by listing all Addenda received and attached in the space below.

Addendum 1, Dated 02/21/2024
If an Addendum or Addenda have been issued by the City and not attached and noted above as being received by the Bidder, the Bid may be rejected.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 163 of 213 ends

C. Inspection of the Work and Contract Documents. Bidder certifies that it has carefully examined and is fully familiar with all of the provisions of the Bidding Documents and said Bidding Documents contain sufficient detail regarding the Work to be performed; that it has notified City of any errors or omissions in the Bidding Documents and/or any unusual site conditions; and that it has carefully checked all words, prices, and statements in this Bidding Document. Bidder hereby certifies that he/she and his/her Subcontractors have inspected the site and related Drawings and Specifications of Work and fully acquainted themselves with all conditions and matters which may in any way affect the Work, time of completion or the costs thereof.

Bidder also certifies he/she has observed the designated Contractor Work areas and access routes, if disclosed or shown, as part of the Work in this Contract.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 164 of 213 ends

PRE-BID SITE INSPECTION - CERTIFICATION:

Person(s) who inspected site of the proposed Work for your firm:

Name:

Title:

Name:

Title:

Davis Lim
Project Adminstrator
N/A
Date of Inspection 2/15/2024
Date of Inspection ______ _
D. Bidder agrees that all costs of Work shown in the Bidding Documents, including work reasonably inferable therefrom and necessary thereto, are included in his/her Bid. All Work shown in the Contract Documents for whic a specific line item is not provided in the Bidding Form is included in the Bidder's Total Base Bid Price.

Contractor shall be reimbursed for the actual direct cost of all Permit Fees, if any, as defined in Paragraph 1.01 and addressed in Paragraph 1.03 of the General Conditions. Bidder shall exclude the cost of Permit Fees from Bidder's Base Bid sum; Base Bid sum shall include the cost of administration and coordination of Governmental Approvals and Utility Fees. Bidder agrees that City will not be responsible for any errors or omissions on the part of the undersigned in making this Bid.

E. Forfeiture of Bid Security. Bidder further agrees that, in case of his/her default in executing the required Contract and the required bonds, or furnishing the required insurance, the money payable under the Bid Security accompanying this Bid shall be applied by the City towards payment of the damage to the City o account of such default, as provided in the Bidding Documents.

F. Period of lrrevocability. Bidder agrees that this Bid shall remain open and shall not be withdrawn for a period of not less than ninety (90) calendar days from the date of award of Contract, or until rejected by the City, whichever period is shorter.

G. Bid Dispute Indemnification. In the event of a Bid dispute based upon the Bidder's submission of this Bid and the City acceptance of same, the Bidder shall indemnify, defend (with counsel acceptable to City), and hold harmless the City, its City Council members, employees, and agents from liability, claims, demands, damages, and costs arising therefrom if such dispute or action arises solely upon the award of a Contract in compliance with federal, state, and local laws.

The Bidder declares that neither he/she nor any member of his/her firm or corporation is an officer or employee of the City of Vernon.

I hereby certify under penalty of perjury under the laws of the State of California that the representations made herein are true and correct.

California E t d th. 2
7 d f February 2024 t Norwalk
xecu e Is _ ay o ___ , __ ,a _______________ _
City State
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 165 of 213 ends

Bidder's Proposal
Respectfully Submitted
COMPANY NAME:

ADDRESS:

CONTACT PERSON:

TELEPHONE NUMBER:

E-MAIL

AME OF BIDDER
Golden Gate Steel. Inc. OBA Golden Gate Construction
14709 Carmenila Road Norwalk, CA 90650
Yohann Chang
(562) 210-8108
information. [email protected]
CALIFORNIA STATE CONTRACTOR'S LICENSE NUMBER: _7_7_6_7_0_8 ____ _ EXPIRATION DATE: 10/31/2024
TAX IDENTIFICATION NO.: 95-4801618
SURETY COMPANY: The Gray Casualty & Surety Company
All Bid forms must be signed where so indicated by the person or persons duly authorized to sign on behalf of the Bidder. By signing the Bid. the person signing is deemed to represent that he or she has authority to bind the Bidder.

Failure to sign the Bidder's Proposal may invalidate the Bid.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 166 of 213 ends

BIDDER'S PROPOSA -SIG ATURE(S):

Form of Entity of Bidder:

Please check the appropriate signature block below an fill in all related information. □ Sole Proprietorship:

Name: ______________
Title: ____________ _
Signature: ___________ _
List all d/b/a's: ___________ ____________ _
□ Partnership: D General Partner D Limited Partner
Name: ____________ _
Title: ___________ _
Signature: __________ _
I■ j Corporation:

Corporate Officer Title: _P_re_sid_en_t _____ _
□ Joint Venture: [lCorporation
Individual
□Partnership
D Other ----
Name: _____________ _
Title: __________ _
Signature: __________ _
Corporate Seal
'J
•J I i
J I I
) >, •I)
, )
Name of all Joint Venturers: _______________________ _
[If the Bidder is a corporation or a limited liability company, enter state or county of incorporation in addition to the business address and include an incumbency certificate exec ted by a Secretary thereof in the form set forth herein listing each officer with signing authority and his/her corresponding office. If the Bidder is a partnership or joint venturer stating that the respective partner or joint venturer agrees to be held jointly and severally liable for any and all of the duties and obligations of the Bidder under the Bid and nder any contract arising therefrom. Attach evidence to the Bid Proposal Form that the individual signing has authority to do so.] Golden Gate Steel, Inc. dba Golden Gate Construction

Page 167 of 213 ends

SCHEDULE OF BID PRICES
PROJECT: North Parking Security Fencing, Contract No. 20240259 BIDDER'S NAME: Golden Gate Steel, Inc. OBA Golden Gate Construction

BASE BID
Pursuant to and in compliance with your Notice Inviting Bids and Contract Documents relating to the Project including all Addenda (attach signed copies), Bidder, having become thoroughly familiar with the terms and conditions of the Contract Documents and with local conditions affecting the performance and the costs of the Work at the place where the Work is to be done, ereby proposes and agrees to fully perform the Work within the time stated in strict accordance with the Contract Documents (including the furnishing of any and all labor, materials, tools, expendable equipment, and utility and transportation services necessary to fully perform the Work and complete it in a workmanlike manner) for the total Base Bid sum of:

Two Hundred Eighty Three Thousand Four Hundred Eighty Dollars D o II ars Item No. Description Units

1. Unclassified Excavation - Saw Cut CY
and, removal and disr;1osal
concrete/asohalt

2. Wrought Iron with Privacl Screen LF
Mesh cored; includes r;1anels and
sguare r;1ost mounts, core and
anchor onto ground in working
order r;1er sr;1ecial r;1rovisions {AND
custom 1'x1'
or;1ening r;1er Plans}

3. Wrought Iron with Privacl Screen LF
Mesh cored; includes r;1anels and
sguare r;1ost mounts, core and
anchor onto existing Block Wall in
working order r;1er sr;1ecial
Qrovisions {AND custom 1'x1'
or;1ening Qer Plans}
3 Vehicle Access Gates: Wrought EA
Iron Swing Gates with Privacl
Screen Mesh Cored; includes gate
r;1osts and liftmaster gate
or;1erators and sensor units Qer
soecial orovisions.

4. Vehicle Access Gates: Wrought EA
Iron Rolling Gates with Privac�
Screen Mesh Cored; includes gate
l)Osts and lift master gate
or;1erators, sensor units, and vgroove tracks t;1lated and anchored onto the concrete slab {installed
QY
Contractor) oer special provision.
($283,480.00
Quantity Unit Cost Amount
100
$55.00 $5,500.00
160
$422.00 $67,520.00
140
$170.00 $23,800.00
i
$21,200.00 $42,400.00
�
2 $26,500.00 $53,000.00
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 168 of 213 ends

5. Vehicle Access Gate: II I! • EA �
includes gate gosts and Qrivacll,
and v-groove tracks N/A N/A glated and anchored at concrete slab (installed bl£ Contractor} Qer
soecial orovisions

6. Inductive LooQ Detectors; EA 12
includes looQs of the tJ£Qe Qer
SQecial grovisions and in working $1,280.00 $15,360.00
order and sealants Qer SQecial
orovisions

7. Pedestrian Gates: Double-Door; EA f
includes gates of the tJ£Qe Qer
SQecial Qrovisions and in working
order, kel£Qad locked lever door $13,395.00 $26,790.00 handle, gate frame fabrication, Qrivacl£ mesh cored and door
closers Qer
soecial orovisions (no center oosO

8. Pedestrian Gates: Single-Door; EA 1
includes gates of the tl£Qe Qer
SQecial Qrovisions and in working
order, kel£Qad locked lever door $16,000.00 $16,000.00 handle and gate frame fabrication, Qrivacll mesh cored and door
closers Qer
soecial orovisions (no center oostl

9. Chain-Link Cage; includes EA f
material and dimensions Qer
$16,555.00 $33,110.00 SQecial Qrovisions, gosts, and
anchors oer special provisions
BID
$ 283,480.00 TOTAL

WRITTEN AMOUNT
$ Two Hundred Eighty Three Thousand Four Hundred Eighty Dollars All other work items, labor, materials, tools and incidentals which are not specifica y listed in the above bid items, but are necessary to complete the project per specifications, and all other applicable standards and codes are considered to be included in the above bid items.

If there is a discrepancy between (1) the "Grand Total" shown immediately above, (2) any of the "total costs" shown m the far right column above, or (3) the individual Unit Price, then the Unit price shall control over the total cost, and the total cost shall control over the total. If, however, the unit price is ambiguous, unintelligible, or uncertain for any cause, or is omitted, or is the same amount as the entry for the item total, then the item total shall prevail and sha!I be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.

Bidder shall exclude the cost of Permit Fees from Bidder's Base Bid sum; Base Bid sum shall include the cost of administration and coordination of Governmental Approvals and Utility Fees.

Bidder acknowledges that determination of the lowest Bid will be based on the combined total of the amounts entered below for the Base Bid plus all of the listed Bid Alternate items, and that once the low bid is determined on this basis, the City will be free to select Bid Alternates for inclusion in the Work in any order or combination, or to reject any or all Golden Gate Steel, Inc. dba Golden Gate Construction

Page 169 of 213 ends

below for the Base Bid plus all of the listed Bid Alternate items, and that once the low bid is determined on this basis, the City will be free to select Bid Alternates for inclusion in the Work in any order or combination, or to reject any or all Bid Alternates.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 170 of 213 ends

TOTAL BID AMOUNT (Base Bid Sum plus Additive or Deductive Alternate No(s). _)
Two Hundred Eighty Three Thousand Four Hundred Eighty Dollars ($ 283,480.00 (written dollar amount)
Respectfully submitted:

Signal
President
Title
776708
License Number
(dollar amount)
14709 Carmenita Road Norwalk, CA 90650
Address
Feb. 27,2024
Date 10/31/2024
Date of Expiration
(SEAL - if Bid is by a corporation)
Atte
Amoun
st: Y
t o
o
f
ha
Certified
nn Cha
or
ng
Cas
::::::----
hier's
�
Check 0�$ lO%oflheTotalBidAmount
Name of Bonding Company: The Gray Casualty & Surety Company Golden Gate Steel, Inc. dba Golden Gate Construction

Page 171 of 213 ends

INCUMBENCY CERTIFICATE
Print legibly the names ana title of the president and all officers of the Company who are authorized to sign the Bid Forms:

PRESIDENT'S & OFFICERS' NAME: TITLE:

Yohann Chang President, Secretary, Treasurer
The undersigned hereby certifies to the City of Vernon that he/she is the duly elected and acting Secretary of Golden Gate Steel, Inc OBA Golden Gate Construction (the "Company"), and that, as such, he/she is authorized to execute this Incumbency Certificate on behalf of the Company, and further certifies that the persons named above are the duly elected, qualified and acting officers of the Company, holding on the date hereof, the titles and positions set forth opposite their names and are authorized to sign the Bid Forms.

IN WITNESS WHEREOF, the undersigned has executed this Incumbency Certificate this 3!____ day of February
, 20�.

Yohann Chang
Se
Bond o.: BX0029904
Premium Amount: $_2s_.o _oo ____ _ Bon 's Effective Date: _os_,o_s,2_02_3 __ _ Golden Gate Steel, Inc. dba Golden Gate Construction

Page 172 of 213 ends

BID BOND
RECITALS:

1. The City of Vernon, California ("City"), has issue a 0lIce Inviting Bids for the Work described as follows:

Specification No. 20240259: North Parking Security Fencing, Contract in Vernon, CA. ("Project").

2. In response to the Notice Inviting Bids, Golden Gate Steel, Inc. dba Golden Gate Construction. (Name, address, and telephone of Contractor)
1_4_7_09_ _C_a_ r_m_en_ita__Ro_ad__No_r_w_a_lk--',C__A_9_06_5_0_-'--, .,_(5_6_2,_) 2_1_0_-_81_0_ 8 _____________ ("Principa "), has submitted the accompanying Bid for the Project.

3. Principal is req ired under the terms of the Specification and all Bidding Docur11enls referenced in it to furnish a bond with the Bid.

4. The Specification, including all its amendments and supplements, and Principal's Bid are incorporated into th1,, Bond and made a part of it by this reference.

OBLIGATION:

THEREFORE, for value received, We, Principal and
The Gray Casualty & Surety Company, P.O. Box 6202 Metairie. LA 70009 , (877) 857-6006 (Name, address, and telephone of Surety)
______________________________ ("Surety'), a duly
admitted surely insurer under California's laws, agree as follows:

By this Bond, We jointly and severally obligate and bind ourselves, and our respective heirs, execut s, admmistrators. successors, and assigns lo pay City the perial sum of Ten Percent of the Total Amount of the Bid Dollars($ 10% ) ("the Bonded Sum''), this amount comprising not less than TEN PERCENT (10%) of Principal's Base Bid, in lawful money of the United States of America.

The Licensed Agent for Surety is: Preferred Bonding & Insurance Services. 3455 Ocean View Blvd #200 Glenoale. CA 91208. (323) 663-7814 (Name, address, and teleph011e)
Registered Agent's California Department of Insurance license "Jo. 0D69256 THE CONDITION OF THIS BOND'S OBLIGATION IS THAT, if: (1) Principal does not (a) withdraw its Bid for the period specified in the Bidding Documents, or if no period is specified for ninety (90) calendar days after City awards the Contract for the Project. or (b) attempt to withdraw its Bid when the requirements of California Public Contract Code §5101 el seq., or any successor legislation, are not met; or (2) City awards Principal the Contract in response lo Principal's Bid, and within the time and manner specified by the Speciftation or Contract Documents or if no period is specified within fourteen (14) calendar days after the Contract's award, Principa (a) signs and delivers to City the Contract, in accordance with the Bid as accepted. (b) furnishes the required bonds for not only Principal's faithful performance and proper f lfillment ot the Col'ltract, but also Principal's payment for labor and materials used in the Project, and (c) furnishes the required insurance then this obligation becomes null and void.

Otherwise, this Bond remains in full force and ellect, and the to owing terms and conditions apply to this Bood:

1. Surety's obligations under this Bond are separate, independent from, and not contingent upon any other surety's guaranteeing that upon City's awarding the Contract to Principal. the Principal will enter into the Contract with City.

2. No right of action accrues on this Bond to any entity other than City or its successors and assigns.

3. If an action at law or in equity is necessary lo enforce or interpret this Bond's terms. Surety must pay in addition to the Bonded Sum City's reasonable aitorneys· fees and li!lgation costs, in an amount the court fixes.

4. Surety shall mail City 'Nritte1 notice at least 30 days before: (a) the effective dale on which the Surety will cancel, terminate or withdraw from this Bond· or (b) this Bond becomes void or unenforceable for <lllY reason.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 173 of 213 ends

On the ate set forth be ow, Principal and Surety duly executed this Bond, with the name of each party appearing below and signed by its representative(s) under the authority of its governing body.

Date: February 27, 2024
PRINCIPA:

Golden Gate Steel. Inc
. dba
Golden Gate Construction,
Address for Serving Nolices or Other Documents:
14709 armenita Road
Norwalk. CA 90650

CORPORATE SEAL
SURETY:

The Gray Casualty & Surety Company
�-O
m any�• _ t dul;i:. , • �
(Signature)
By: ____ P_1etr_o_M__ic_ic_h_e _______ _ (Name)
11s: ____ Att__or_ne_y'-- -_in_-F_ac_t ________ _
(Title)
Address for Serving otices or Other Documents:

P.O Box 6202
M etairie, LA 70009

CORPORATE SEAL
• EVIDENCE MUST BE A 7T ACHED OF THE AUTHORITY OF ANY PERSON SiGNING AS A TTORNEY-1 -FACT. • THE A ITORNEY-IN-FACT"S SIGNATURE MUST BE NOTARIZED.
11 A CORPORATE SEAL MUST BE IMPRESSED ON THIS FORM WHEN THE PRINCIPAL OR THE SURETY. OR BOTH, ARE A CORPORATION.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 174 of 213 ends

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

State of California
County of Los Angeles
On Feb. 27, 2024 before me, Sunghee Ha1 Notary Public
(insert name and title of the officer)
personally appeared _Y_
o_h_a_n_n_C_h_a_
n _g _____________________ _
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature _....,4L.__.._ __ i.-.oc-=--=---}1__-----___ _ (Seal) r·········· a SUNGHEEHA .. ·t
d COMM.# 2364221 �
ffi NOTARY PUBLIC • (At IFORNIA (")
lO�ANGElfSCOUNT'I I--"
1 Mv Comm Exp,res JYlv �.102'> " ••••••••••••
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 175 of 213 ends

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Los An eles
____ _
On t-G\:i((M°\Vj i 11\/JOk_\ before me, _A_n--"--ge_l N_u_n_ez_,_N_ot _ar-'-y_Pub_l_lc ________ _
Date Here Insert Name and Title of the Officer
personally appeared _Pe_,t_r _i o _M_
icc__
ic_
he
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(){} whose narneO{) is!Ml}e subscribed to the within instrument and acknowledged to me that he.lJ(�)oox executed the same in hi�Jit�it:: authorized capacity(le's), and that by hisM�)(ll(signature(!il) on the instrument the person(,o, or the entity _upon behalf of which the person�) acted, executed the instrument.

ANGEL NUNEZ
Notary Public • California 1, ; Los Angeles Co�nty !:

Commission# 2321675
y Comm. Expires Mar 14, 2024
Place Notary Seal Above
I certify under PENAL TY OF PERJURY under the laws
of the State of Califo ·a that the foregoing paragraph
is true and corr
----------------oPTIONAL---------------
Though this section is optional, completing this information can deter alteration of the document or fraudufent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: ___ _ __ __ Document Date: _______ _ Number of Pages: ___ Signer(s) Other Than Named Above: ____ _ Capacity(ies) Claimed by Signer(s)
Signer's Name: ____________ _
,- 1 Corporate Officer - Title(s): ____ _
D Partner - r-i Limit,ad t: General
D Individual """Attorney in Fact
[] Trustee [ Guardian or Conservator
0 Other: __ _ _________ _
Signer Is Representing: _________ _
Signer's Name: ____________ _
r) Corporate Officer - Title(s): ______ _
L. Partner - t l Limited I General
r:J Individual J Attorney in Fact
:=:J Trustee U Guardian or Conservator
r_J Other:

Signer Is Representing: ________ _
©2014 National Notary Association• www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #15907 Golden Gate Steel, Inc. dba Golden Gate Construction

Page 176 of 213 ends

,,

STATE OF CALIFORNIA )
) ss

COU TY OF )

BOND ACKNOWLEDGMENT
FOR

SURETY'S ATTORNEY-IN-FACT
On this ___ day of _ _ ___ , 20 __ ,
before me, (name a Notary Public for said County, personally appeared (name). who proved to me on the basis of salisfactor evidence to be the person whose name is subscribed to this instrument as the attorney in fact of ____________ , and acknow edged to me that he/she subscribed the name of thereto as principal, and is/he own name as attorney in fact.

I certify under PE AL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is trne dnd correct.

Notary Public
SEAL
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 177 of 213 ends

l'rcf;:n.:ct Bonding S.:n·iccs
12 07.:!Cl'.3 1-U I I0-N5980�0576

THE GRAY INSURANCE COMPANY

THE GRAY CAS ALTY & SURETY COMPANY

GENERAL POWER OF ATTORNEY
Bond Numbcr:8 B
Project: /'{o"( � PO\'(�\(\�
Principal:{i-oldtr\ �t(.; �fetl, 1-nl, �'°" wl4en �.,,� (ot'll,trqefjo� {,e,£V\ f l�J �e,nd�� •
f..:'J()\li ,\LL BY Tl IESE PRESENTS. Tl 1/\T Th�· (iray lnsuranc.:c.: ·om pan� and The< irn� Casualty & Surccy Company c.:orporations duly organi1.cJ and cxi:-ting under the la,1 s or I .ouisiana . .Ull ha, ing lhc.:ir p, 1111.:ipal onic.:cs in i\k1airic. I .ouisiana. do hcrc.:by 1m1kc. c.:onstItutc. anJ ,ippoilll: Patricia Zenizo, Elisabete Salazar, and Pietro :\licciche of Los Angeles, California jointly and se,·ernJI�· on bc.:halr or cac.:h or the.:

C1,mpanic.:s nam.:d abO\e its true.: and la11 l'ul Altom.:� (sl-in-l·ac.:t. w make. c.:xc.:c.:utc.:. sc.:al and dc.:ii1 c.:r. for and on its hdialr and as its dc.:c.:d. bonds. or olhc.:r "ritings obligatory in the.: nalllrc or a bond. as surct�. c.:onlrac.:ls or sun:tyship as arc.: or may be required or p.:rmiued by ,1,1. regulation. c.:ontract or othem ise. provided that no bond 1ir undertaking or contra.:! or sun:t� ship exc.:c.:uted undc.:r thi:- authoril� shall excc.:ed the.: amount 11 S:!5.000.000.00.

I 1is l'o\\cr of J\Uorney is granted and � signc.:d by fac.:simik undc.:r and b� the.: authority o • the folhm ing Rc�olutions adoptc.:d h) the Bo,mb o·· 1)in:c1ors of'holh The (ira) Insurance Co111p,111y and Thc (iray C.1stmlty & Surcly Company al 111cc1ing:< dul� calkd and hdd on the 26''' day of June.:. 2003.
··RESOLVED. that th.:: l'rc.:siJcm. l·'\ccuti,c.: \',cc l'rcs1dc.:m. ,111) Vicc l'rc.:sid.::111. oil 11: Sccrc.:1,11) be and c,11:h �•ran� ofthc.:m hc.:rc.:b) is au1hori1.cd to .:xeculc.: a power or l\norney qualil:-ing lhc.: anorncy named in the gil en l'o\\er of /\Horne) 10 i.::-.ec111i.: on lichalf ol lie Cump:my bonds. un<lc.:rtal.:ings. and all eo111rac1s of surety. and that c.:ac.:h or any of thc.:111 is hc.:rcb� authorizc.:<l to ,lllc.:st to the.: execution 01·: 1ch l'o\\ .::r or 1\llorn.:y. and to auach the sc.:al or the.: Company: and ii is
Fl iRTI IER RESOLVED. that the sign,11un: of such onicc.:rs and th.: �c.:al orth..: Com pan) may he al'lhi.:d 10 an� suc.:h 1'1l\\cr of Ailorn..:y or to an) certilicalc.: rc.:lating thereto b) facsimile.:. and an) such l\mc.:r or :\uorn,;) or cc.:rtilicatc.: bc.:aring such facsimile signature or fi.1esimik seal shall be binding upon the Company nm1 and in th..: futur.:: "hc.:n so affixed II ith rc.:gard to any hond. undcrtaking or contract of �urc.:t) to 11 hic.:h it is auachcd.

IN \J.Tl
°
Nl�ss 'A'i ILREOF. Th..: (iray lnsurancc.: Compan� and The (iray Casuah� & Surc.:t� Crnnpan) hme c.:auscd 1h..:ir onicml seals to he hc.:reinw ar hed. and these pre�cnts to he.: sig.n..:d by thc.:ir authori;,ed on1cc.:rs thi:-: -l''' da) or :\1l\ emhcr. :!0:!2.

Stale or I .ouisiana
Parish or .1cn;.:rson
Michael T. {ira�
l're:-idc.:nl
I he Gray Insurance Compa11:,
Culkn S. Piske
l're�1dcnt
Ilic.: (iray Casualty & Surc.:t� lllllfl,111)
On this-l'" tlay ofNo,·c.:mber.10::!1. h..:for..: me.:. a 1\otm, Public. pcr,-,onall) appeared \lichad I <irn�. l're:--itlc.:nt or ni..- (irn� In. urnncc Company. and Cullen S. Piske.:. Prcsidc.:nt or f'he ( ira� Casually & St.ret� l om pan�. pc.:r�onall) !..no,1 n 111 mc.:. bc.:ing duly s,1 om. uc.:l..n1rn lcdg.ed that th..-y sig.n..:d the aho,·e Powc.:r or !\ltorne� anti aflhc.:d 1hc �c.:ais of th.: c.:ompanic.:s as oflkers ot: and ad-.mn1 lc.:dg,·d said instrum..:nt to h,· th,· ,,,luntar� 111.:t anJ dc.:ed. of their companI..:s.
l.ci0h Anni.: I knican
°\otm� l'uhli..:. l'ari,,h or Orleans State or Louisiana \·I� ·omm1ssion 1:- for l.ik
I. :\1urk S. i\-languno. Sccrl!lar� o The (im� Insurance.: Com puny. do hc.:reh) c.:r ti!:, i!int the.: abo1, .:,;d forgoing i:< a true.: and correc.:t copy or a l'm1cr or I\Uornc.:y gi,·..:n h� the c.:ompanict which ,s still in full fore.:..: and c.:flcc.:l. I. , \\ ITl\ES:-. \\ 111:REOF. I ha, e sc.:t m� hand an<l a nixed the.: seals or the Company this tJ1,,
uay or Feb
�P#�r� (V\O\t:> 1,..0.J.1
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 178 of 213 ends

BIDDER'S STATEMENT OF QUALIFICATIONS

1. ORGANIZATION

1.1 How many years has your organization been in business as a Contractor? _23_Y_ e_ars __ _

1.2 How many years has your organization been in business under its present name? 23 Years

1.2.1 Under what other names has your organization operated? N/A

1.3 If your organization is a corporation, answer the following:

1.3. Date of incorporation/organization: _s,_16_12_ 0_00 ___________ _

1.3.2 State of incorporation/organization: _c_a,_ito_rn_ia __________ _

1.3.3 Corporate ID number: _c_21_9_13_2s ______________ _

1.3.4 Name of President: _v_oh_an_n_C_ha_n.;;...
g ---------------

1.3.5 Agent for Service of Process: _N_
tA _____________ _

1.4 If your organization is a partnership, answer the following:

1.4.1 Date of organization/formation:-"'-' ______________

1.4.2 Type of partnership (if applicab e
)
: ____________ _

1.4.3 Name(s) of general partner(s)
: _____________ _
1 .4.4 List all states in which you are registered and state ID numbers for each:

1.5 If your organization is individually owned, a swer the following:
.5. Date of organization: _N_IA _______________ _

1.5.2 Name of owner: ___________________ _

1.6 If the form of your organization is other than those listed above, describe it and name the principals: _N_
1A ____________________ _ _
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 179 of 213 ends

2. LICENSING

2.1 List jurisdictions in whic your organization is legally qualified to do business, indicate registration or license numbers, and category of license, if applicable.

State of California I CSLB #776708 / DIR #1000016071

2.2 List juris ictions in which your organization's partnership or trade name is filed.

State of California

2.3 isl any licensing suspensions and/or violations assessed against your organization within the past five years.

None

3. EXPERIENCE

3.1 List the categories of Work that your organization normally performs with its own personnel.

General Construction including Steel Structure, Ornamental, Fence. Concrete. Door, Framing, Drywall & Landscape.

3.2 On the Experience Form, list the project information that establishes that Bidder meets the essential requirements for qualification set forth in the Mandatory Qualifications paragraph of the Notice Inviting Bids for this Project.

3.3 Have Subcontractors for work complete the Specialty Contractors' Statements of Qualifications (or Bidder to complete if self-performing).

3.4 On a separate sheet, list projects to which your firm or business has been awarded a government contract since your firm or business has been in existence (giving the name and address of the project, the government agency, contact name and phone number, the contract amount, and contract's starting date and ending date). (See Attachment #1)

3.5 On a separate sheet, list the experience and present commitments of the key individuals of your organization. (See Attachment #2)

4. CLAIMS; LAWSUITS; CRIMINAL ACTS
For the following questions, the term "owner" does not include owners of stock in your firm if your firm is a publicly traded corporation.

4.1 In the past five (5) years, have, you, your firm or any of its owners, partners, officers, or employees been a defendant in court, or participated in an arbitration or mediation, on a matter related to:

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 180 of 213 ends

4.1.1 The performance, non-performance, default, violation, or breach of a contract or agreement?
□ YES [ZJNO

4.1.2 A vehicle collision or accident involving your firm's employees? □ YES

4.1.3 Damage to real property arising out of your services or operations? □ YES IZlNo

4.1.4 Employment-related litigation brought by an employee of your firm? □ YES [ZJ NO

4.1.5 Payment to a subcontractor or supplier?
□ YES [Z]NO

4.1.6 Defective, deficient, or substandard work?
□ YES [Z]NO
If the answer to any questions in 4.1.1 to 4.1.6 is YES, identify the name of the person or entity that sued (i.e., "the plaintiff') or was involved in the mediation or arbitration; list the date, court, court address, and case number; describe the facts and circumstances gi ing rise to the lawsuit, mediation, or arbitration; and set forth the outcome or disposition. Attach additional sheets as necessary.

4.2 Have you or your firm ever filed a claim for damages or a lawsuit, or requested arbitration or mediation, against a government entity or a Client?
□ YES [Z] NO
If YES, identify the government entity or client; list the date, court and case number; describe the facts and circumstances about the claim for damages, or the lawsuit, or both; and set forth the outcome or disposition. Attach additional sheets as necessary.

4.3 Are there any pending or outstanding judgments or liens against you, your firm, or any of its owners, partners, officers, or employees?
□ YES l2J NO
If YES, identify the name of the person or entity entitled to payment; list the date court and case number; describe the facts and circumstances giving rise to the judgment or lien; and set forth the amount of the judgment or lien. Attach additional sheets if necessary.

4.4 In the past five (5) years, has any government entity ever: (a) investigated, cited, disciplined, Golden Gate Steel, Inc. dba Golden Gate Construction

Page 181 of 213 ends

or assessed any penalties against you, your firm, or any of its owners, partners, officers, or employees, or (b) determined or concluded that your firm or any of its owners, partners, officers, or employees violated any laws, rules, or regulations? □ YES
If YES, identify the government entity; list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

4.5 In the past five (5) years, have yo , your firm or any of its owners, partners, officers or employees been convicted of a crime related to the bidding of a government contract, the awarding of a government contract, or the performance of a government contract? ("Convicted" includes a verdict of guilty by a judge or jury, a plea of guilty, a plea of nolo contendere, or a forfeiture of bail.)
□ YES 0NO
If YES, identify the government entity; list the date, court and case number; describe the facts and circumstances about each instance; and set forth the penalty or punishment imposed. Attach additional sheets as necessary.

4.6 In the past ive (5) years, have you, your firm, or any of its owners, partners, officers or employees been convicted of a crime involving embezzlement, theft, fraud, forgery, bribery, deceptive or unlawful business practices, perjury, falsifying or destroying records or evidence, or receiving stolen property, or making or submitting a false claim? □ YES [Z] 0
If YES, identify the crime or offense; list the date, court and case number; describe the facts and circumstances about each instance; and set forth the penalty or punishment imposed. Attach additional sheets as necessary.

4.7 Have you or, if Bidder is a corporation, any principal of the corporation ever been convicted of a felony?
□ YES
If YES, please explain the details of that conviction and, if so, whether you or said officer have served his or her sentence.

4.8 In the past five (5) years, has a government entity determine or concluded that you, your firm, or any of its owners, partners, officers or employees made or submitted a fa se claim (including a false claim for payment), or made a material misrepresentation? YES 12] NO
If YES, identify the government entity, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 182 of 213 ends

4.9 Have you or your company ever been charged by any governmenta agency for failure to follow safety procedures? If YES, please explain.
□ YES IZ1NO

4.10 Has any governmental agency ever submitted a complaint against you or your firm to the California State abor Commission for failure to submit certified payrolls? If your answer is "Yes", please provide the details of such complaint.

5. FIRM'S OPERATIONAL STATUS
□ YES [Z]NO

5.1. In the past seven (7) years, has your firm, or anyone else acting on behalf of your firm, filed for bankruptcy, insolvency, receivership, or reorganization? □ YES [Z]NO
If YES, list the filing date, identify the court and case number; describe the facts and circumstances giving rise to each instance; and set forth the disposition or current status.

Attach additional sheets as necessary.

5.2. In the past five (5 years, has your firm had an consolidations, mergers, acquisitions, closings, layoffs or staff reductions?
□ YES IZJ NO
If YES, list the filing date, and describe the facts and circumstances about each instance.

Attach additional sheets as necessary.

5.3. Is your firm in the process of, or in negotiations toward: (a) consolidating, merging, selling, or closing its business, or (b) laying off employees or reducing staff? □ YES
If YES, describe the transaction; list the anticipated date for completing the transaction, laying off employees, or reducing staff; and describe the facts, circumstances, and reason for taking the action. Attach additional s eels as necessary.

6. BIDDING; DEBARMENT; CONTRAC PERFORMANCE

6.1. Has a government entity ever debarred, disqualified, removed, suspended, or otherwise prevented you or your firm from bidding on, contracting, or completing a construction project?
□ YES
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 183 of 213 ends

If YES, identify the name of the government entity, list the date, and describe the facts and circumstances about each instance, and state the reason for the government entity's action against your firm. Attach additional sheets as necessary.

6.2. Has a government entity ever rejected your firm's Bid or Proposal on the ground that you or your firm is a "non-responsible" bidder or proposer? □ YES [Z]NO
If YES, identify the name of the government entity, list the date, describe the facts and circumstances about each instance, and state the reason or basis for the government entity's determining that your firm was a "non-responsible" bidder. Attach additional sheets as necessary.

6.3. Have you or your firm ever failed to fulfill or perform - either partially or completely - a contract or an agreement with a government entity or a c ient? □ YES
If YES, identify the name of the government entity or client, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

6.4. In the past five (5) years, have you or any officer or principal of your firm been an officer of another firm which failed to perform a contract or agreement? □ YES [{)NO
If YES, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

6.5. Has your firm ever advised a government entity or a client, while your firm was under contract with the government entity or client, that your firm could not (or would not) fulfill or perform - either partially or completely - the contract or the agreement based on the prices that your firm had originally submitted in a Bid or a Proposal? □ YES [Z]NO
If YES, list the date, identify the name of the government entity or client, and describe the facts and circumstances about each instance. Attach ad itional sheets as necessary.

6.6. Has your firm ever requested a government entity or a client, while your firm was under contract with the government entity or client, to renegotiate one or more terms of the existing contract or agreement?
□ YES
If YES, identify the name of the government entity or client, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 184 of 213 ends

6.7. Has your firm ever requested a government entity or a client, whi e your firm was under contract with the government entity or client, to: (a) cancel the contract or agreement, or (b) release or discharge your firm form the contract or agreement? 0 YES
If YES, identify the name of the government entity or client, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

6.8. Has a government entity or a client ever terminated, suspended, or non-renewed your firm's contract or agreement before its completion?
0 YES
If YES, identify the name of the government entity, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

6.9. Has a government entity or a client ever notified or advised your firm that your firm's performance under a contract or agreement was poor, sub-standard, deficient, or noncompliant? 0 YES Ill NO
If YES, identify the name of the government entity or client, list the date, and describe the facts and circumstances about each instance. Attach additional sheets as necessary.

6.10. In the past five (5) years, has your firm paid, or has your firm been assessed, liquidated damages on a contract or agreement?
0 YES [Z] NO
If YES, identify all such contracts/projects by owner, owner's address, the date of completion of the project, amount of liquidated damages assessed, and all other information necessary to fully explain the assessment or payment of liquidated damages. Attach additional sheets as necessary.

7. INSURANCE AND BONDS

7. 1. In the past ten years, has an insurance company or a surety company:

7. 1. 1. Refused to insure your firm for liability coverage? 0 YES

7.1.2. Canceled or non-renewed your firm's insurance coverage? □ YES

7. 1.3. Refused to issue your firm a bond?
□ YES IZlNo
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 185 of 213 ends

7 .1.4. Canceled or revoked a bond obtained by your firm? □ YES
If the answer to any questions in 7.1.1 to 7.1.4 is YES, identify the name of the insurance company or surety company, list the date, and describe the facts and circumstances about each instance. Attach addition sheets as necessary.

7.2 In the past ten (10) years, has an insurance company or surety company made any payments on your firm's behalf as a result of a default, to satisfy any claims against a performance bond, payment bond, or maintenance bond issued on your irm's behalf?

8. SURETY
□ YES
If YES, iden ify each contract completed or amount of each claim, the name and telephone number of the claimant, the date, grounds and current status of the claim, and if resolved, the method, nature, and amount of the resolution Attach addition sheets as necessary.

8.1 If a performance and/or payment bond is required by this bid, identify the bonding company if arrangements for the bond have been made; if not, identify the bonding company for the Contractor's most recent project:

The Gray Casually & Surety Company

8.2 Name and address of agent:

Preferred Bonding Insurance Services
3455 Ocean View Blvd. #200, Glendale. CA 91208
All of the above statements as to experience, financial qualifications, and available plant and equipment are submitted in conjunction with the proposal, as a part thereof, and the truthfulness and accuracy of the information is guaranteed by the Bidder.

I hereby certify under penalty of perjury under the laws of the state of California that the representation made herein are true and correct.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 186 of 213 ends

PROJECT NAME: North Parking Security Fencing

BIDDER'S EXPERIENCE FORM
SPECIFICATION NO. Contract No. 20240259
COMPANY NAME: Golden Gate Steel, Inc. DBA Golden Gate Construction ***Please use additional sheets if necessary
ist below the project information that establishes that Bidder meets the essential requirements for qua ification set forth in the Mandatory Qualifications paragraph of the Notice Inviting Bids for this Project.
2 3

CONTRACT CONTRACT CONTRACT PROJECT NAME AND CONTACT PHONE START DATE END DATE $ AMOUNT AGENCY ADDRESS CONTAC AME NUMBER Myers Elementary School ADA 975 N Meridian Ave.
6/3/2022 9/23/2022 $249,999.00 Front Entry Upgrades & Rialto, CA 923 76 George Palma (909) 421-7555 Rialto Unified School District
pingle Point of Entry at Harvey 1635 S. Center St.
8/30/2021 3/31/2022 $195,798.00 Elementary School & Santa Ana, CA 92704 Bissan Abdelhadi (714) 558-5611 Santa Ana Unified School District
AHS - BLDG'S C&D Stair Repair 101 South 2nd Street
7/1/2022 8/27/2022 $244,350.00 Project & Alhambra, CA 91802-3795 Eric Espinosa (626) 943-6505 Alhambra Unified School District
All of the above statements as to experience are ubmitted in conjunction with the proposal, as a part thereof, and the truthfulness and accuracy of the information is guaranteed by the Bidder. I hereby certify er penalty of perjury under the laws of the state of California that the representation made herein are true and correct.

Signature of Bidder--:::,"'.::._--�,-,,,:;-------
Print Name: Yohann Chang
State of California Contractor's License No. ------ 7767 08 --- Contractor's License expiration date _1_0_/3_1_/_2 _02_ 4 _______ _ Golden Gate Steel, Inc. dba Golden Gate Construction

Page 187 of 213 ends

CONTRACTOR SAFETY QUESTIONNAIRE
Company Name: Golden Gate Steel, Inc. OBA Golden Gate Construction Primary Type of Work: General Construction
Person Completing Form: _Y_oh_a_n_n_C_h_a_n_g ________ _________ _ Title: President
Date: Feb. 27, 2024
Phone Number: (562) 210-8108

SAFETY PERFORMANCE

1. List your company's Interstate Experience Rating Modifier (ERM) 1 for the three most recent years.

0.86 0.86

0.86 2. List your company's number of injuries/illnesses from your OSHA 300 logs for the three most recent years. 20E.__ 20E.__ 20 2_1_
a. Fatalities -- 0 -- 0 -- 0
b. OSHA recordable incidents -- -- 0 0 0
C. Lost work day incidents -- 0 -- 0 -- 0
d. Total lost work days -- 0 -- 0 -- 0
e. Total hours worked 2000 2000 2000

3. Upon request from the City, the contractor(s) shall provide copies of the following items (a-g); and Items (dg) for each listed Subcontractor a). OSHA 300 logs for the most recent three years
and current year-to-date
b). Verification of ERM from your insurance carrier
c). Injury/Illness Report
d). Complete written Safety Program

4. Company Safety Contact:
a. Name Yohann Chang
b. Phone (562) 210-8108
e). Training Plans
n. Training Certificates for Employees
g). Emergency Response raining
1 ERM= app1ies to workers' compensation policies. It compares the experience of this contractor to others of similar size, type and ratio. Used against annual premium. It has a direct correlation to h w much the contractor pays in workers' comp premium.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 188 of 213 ends

1. CONTRACTOR SAFETY QUESTIONNAIRE (continued)

SAFETY PROGRAM

SAFETY PROGRAM DOCUMENTATION
a. Do you have a written safety program manual?
1) Last revision date _1_111_?_120_ 2_2 __ _
b. Do you have a written safety field manual?
c. Are all workers given a booklet that contains work rules, responsibilities, and other appropriate information?

2. POLICY AND MANAGEMENT SUPPOR
a. Do you have a safety policy statement from an officer of the company?
b. Do you have a disciplinary process for enforcement
of your safety program?
c. Does management set corporate safety goals?
d. Does executive management review:

Iii Accident reports?
Iii Safety statistics?
Ii] In pection reports?
e. Do you safety pre-qualify subcontractors?
f. Do you have a written policy on accident reporting
and investigation?
g. Do you have a light-duty, return-to-work policy?
h. Is safety part of your supervisor's performance evaluation? i. Do you have a personal protective equipment (PPE) policy? j. Do you have a written substance abuse program?
If yes, does it include (check all applicable boxes):

Iii Pre-employment testing LJ Return-to-duty testing
Iii Random testing D Disciplinary process
D Reasonable cause testing Iii Alcohol testing
@No
Circle One
�No
@)No
@No
,�:
@No
@No
(§)No
@No
@No
D Post accident testing Iii National Institute on Drug Abuse D Panel Screen
k. Does each level of management have assigned safety
duties and responsibilities?
@No
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 189 of 213 ends

3. TRAINING AND ORIENTATION
a. Do you conduct safety orientation training for each
employee?
b. Do you conduct site safety orientation for every
person new to the job site?
@No
@No
c. Does your safety program require safety training meetings? � No for each supervisor (foreman and above)?
How often?
Iii Weekly Monthly C Quarterly D Annually D Other ____ _ d. Do you hold tool box/tailgate safety meetings
focused on your specific work operations/exposures?
How often?
[jJ Weekly □ Daily □ Other ___ _
e. Do you require equipment operation/certification training?

4. ADMINISTRATION AND PROCEDURES
a. Does your written safety program address
administrative procedures?
If yes, check which apply:
@No
@No
� Pre project/task planning
_!_ Record keeping
� Emergency procedures
_!_Audits/inspections
_!_ Safety committees
!_HAZCOM
� Substance abuse prevention
Return-to-work
b. Do you have project safety committees?
c. Do you conduct job site safety inspections?
How often?
� Accident investigations/reporting
� Training documentation
_!_ Hazardous work permits
Subcontractor prequalification
@No
@No
□ Daily � Weekly □ Monthly □ Other ___ _
Do these inspections inc udes a routine safety
inspection of equipment (e.g., scaffold, ladders, fire
extinguishers, etc.)?
d. Do you investigate accidents?
How are they reported?
D Total company
D By project
D By foreman
■ By superintendent
By project manager
D In accordance with OSHA
e. Do you discuss safety at all preconstruction and progress meetings? Golden Gate Steel, Inc. dba Golden Gate Construction

Page 190 of 213 ends

f. Do you perform riggi g and lifting checks prior to lifting? Yes o Iii For personnel Iii For equipment Iii Heavy lifts (more than 10,000 lbs.)

5. WORK RULES
a. Do you periodically update work rules? (§}No
b.

When was the last update? _A_s Ne_ce_s_sa_-'-
y r______ _
What work practices are addressed by your work rules?
Iii CPR/first aid Iii Access-entrances/stairs
!ii Barricades, signs, Iii Respiratory protection
and signals
Blasting
D Communications
D Compressed air and gases
Iii Concrete work
D Confined-space entry
Iii Cranes/rigging and hoisting
D Electrical grounding
D Environmental controls and
D Material handling/storage
D Temporary eat
D Vehicle safety
D Traffic control
D Site visitor escorting
Iii Public protection
D Equipment guards and grounding
D Monitoring equipment
Occupational health
Iii Emergency procedures
Iii Fire protection and prevention
D Floor and wall openings
Iii Flammable material handling/storage
� Site sanitation
[j] Fall protection
Iii Housekeeping
■ Ladders and scaffolds
D Mechanical equipmenV
maintenance/pre-op checks/
operation
Iii Trenching and excavating
D LockouVTagout
Energized/pressurized equipment
Iii Personal protective equipment
D Tools, power and hand
D Electrical power lines
Iii Welding and cutting (hot work) D Other ______ _

6. OSHA INSPECTIONS
a. Have you been inspected by OSHA in the last three years? b. Were these inspections in response to complaints?
c. Have you been cited as a result of these inspections? If yes, describe the citations (add additional sheets if necessary):

Yes@
Yes@
Yes@
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 191 of 213 ends

DESIGNATION OF SUBCONTRACTORS
NAME OF BIDDER: Golden Gate Steel, Inc. OBA Golden Gate Construction Each Bidder must list, on the form provided on the next page, each Subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed in the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Drawings and Specifications, in an amount in excess of one-half of one percent of the Contractor's Base Bid Amount. Each Subcontractor must have an active and current license, and all requisite specialty certi ications, when listed.

Bidder must provide the following information for EACH Subcontractor.

1. The name of the Subcontractor;

2. The trade and type of work that the Subcontractor will perform;

3. ocation (address) of Subcontractor's place of business;

4. Subcontractor's license number; and any specialty licenses;

5. Subcontractor's public works contractor registration number; and

6. Dollar value of the Work that the Subcontractor will perform.

Subletting or subcontracting of any portion of the Work in excess of one-half of one percent of the Contractor's Base Bid to which no Subcontractor was designated in the original Bid shall only be permitted in cases of public emergency or necessity, and then only after a fin ing reduced to writing as a public record of the City setting forth the facts constituting the emergency or necessity.

If the Contractor violates any of the above provisions the Contractor may be in breach of this Contract and the City may exercise the option, in its own discretion, to (1) cancel this Contract, or (2) assess the Contractor a penalty in an amount not more than ten percent (10%) of the amount of the subcontract involved, and this penalty shall be deposited in the fund out of which the prime Contract is awarded.

If the Contractor fails to specify a Subcontractor, or if the Contractor specifies more than one Subcontractor for the same trade or type of Work to be performed under the Contract in excess of one-half of one percent of the Contractor's Base Bid Amount, then the Contractor agrees that he/she is fully qualified to perform that Work himself/herself, an that he/she shall perform that Work himse f/herself. If after award of Contract, the Contractor subcontracts any sue Work, the Contractor will be subject to the statutory penalties.

DESIGNATION OF SUBCONTRACTORS FORM

IS ON THE FOLLOWING PAGE
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 192 of 213 ends

Please type or legibly print (attach additional sheets as necessary).

Public Works
Name of Subcontractor Email Contact Trade and Type Business Location Information of Work to be License Contractor Dollar($) Value Number Registration
Performed Number
Sparta Fence Inc [email protected] Chain Link Fence Fullerton, CA 1030050 1000953737 $33,110.00 Golden Gate Steel, Inc. dba Golden Gate Construction

Page 193 of 213 ends

The Contractor shall not:

A. Substitute any person as Subcontractor in place of the Subcontractor listed in the original Bid, except that the City may consent to the substitution of another person as Subcontractor in any of the following situations:

1. When the Subcontractor listed in the Bid, after having had a reasonable opportunity to do so, fails or refuses to execute a written contract for the scope of Work specified in the Subcontractor's bid and at the price specified in the Subcontractor's bid, when that written contract, based upon the general terms, conditions, Drawings and Specifications for the Project or the terms of Con ractor's written Bid, is presented to the Subcontractor by the Contractor;

2. When the listed Subcontractor becomes insolvent or the subject of an order for relief in bankruptcy;

3. W en the listed Subcontractor fails or refuses to perform his/her subcontract;

4. When the listed Subcontractor fails or refuses to meet the bond requirements of the Contractor as set forth in Public Contract Code Section 4108;

5. When the Contractor demonstrates to the City that the name of the S bcontractor was listed as the result of an inadvertent clerical error;

6. When the listed Subcontractor is not licensed pursuant to the Contractors License Law;

7. When the City determines that the Work performed by the listed Subcontractor is substantially unsatisfactory and not in substantial accordance with the Drawings and Specifications, or that the Subcontractor is substantially delaying or disrupting the progress of the Work;

8. When the listed Subcontractor is ineligible to work on a public works project pursuant to Secti 1777 .1 or 1777. 7 of the Labor Code; or

9. When the City determines that the listed Subcontractor is not a responsib e contractor.

B. Permit any subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original Subcontractor listed in the original Bid, without the consent of the City.

C. Other than in the performance of "change orders" causing changes or deviations from the original Contract, sublet or subcontract any portion of the Work in excess of one-half of one percent of the Contractor's Base Bid Amount as to which his/her original Bid did not designate a Subcontractor.

Prior to approval of the Contractor's request for a Subcontractor substitution, the City shall give notice in writing to the listed Subcontractor of the Contractor's request to substitute and of the reason for the request. The notice will be served by certified or registered mail to the last known address of the Subcontractor. The listed Subcontractor who has been so notified shall have five (5) Working Days within which to transmit to the City written objections to the substitution. Failure to file these written objections shall constitute the listed Subcontractor's consent to the substitution.

If written objections are filed, the City shall give notice in writing of at least five (5) Working Days to the listed Subcontractor of a hearing by the City on the Contractor's request for substitution.

The Contractor, as a condition to asserting a claim of inadvertent clerical error in the listing of a Subcontractor, shall within two (2) Working Days after the time of the Bid Deadline, give wri ten notice to the City and copies of such notice to both the Subcontractor he/she claims to have listed in error and the intended Subcontractor who had bid to the Contractor prior to the Bid Deadline.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 194 of 213 ends

QUESTIONNAIRE REGARDING SUBCONTRACTORS
Bidder shall answer the following questions and submit with his/her Contract proposal.

1. Were bid depository or registry services used in obtaining subcontractors bid figures in order to compute your bid? Yes □ No Ii]

2. If the answer to No. 1 is "Yes", please forward a copy of the rules of each bi depository you used with this questionnaire.

3. Did you have any source of subcontractors' bids other than bid depositories? No

4. Has any person or group threatened you with subcontractor boycotts, union boycotts, or other sanctions to attempt to convince you to use the services or abide by the rules of one or more bid depositories? Yes D No [j]

5. If the answer to o. 4 is "Yes", please explain the following details:
(a) Date:
(b) Name of person or group:
(c) Job involved (if applicable):
(d) ature of the threats:
(e) Additiona comments:
(Use additional paper if necessary)

6. Was a conscious effort made to recruit or provide equal opportunity for bids by minority or project area subcontractors? Yes Ii] No D

7. Was a conscious effort made to recruit and hire project area lower-income residents? Please submit statement.

Yes [ii No

8. We declare under penalty of perjury that the foregoing is true and correct.

Dated this 27 day of February
, 20 24 .

All of the above statements as to experience, financial qualifications, and available plant and equipment are submitted in conjunction with the proposal, as a part thereof, and the truthfulness and accuracy of the information is guaranteed by the bidder.

Name of Company
By: Golden Gate Steel, Inc. OBA Golden Gate Construction Title: President
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 195 of 213 ends

SPECIAL TY CONTRACTOR OR SUBCONTRACTOR STATEMENT OF QUALIFICATIONS

SUBCONTRACTOR WORK
As part of its Bid, Bidder shall submit this Statement of Qualifications for the Subcontractor that will perform the {Insert specialty sub-contractor work}, or for the Bidder itself, if Bidder will self-perform the concrete and asphalt work for v-groove track, detection loop installation, and reconstruction Work. This information shall provide evidence to indicate successful experience in providing concrete and asphalt work for v-groove trac , detection loop installation, and reconstruction work comparable to that specified in the Project Drawings and Specifications. Referenced qualifications shall demonstrate experience as a successful installer of concrete and asphalt work for v-groove track, detection loop installation, and reconstruction.

A Bid may be rejected as non-responsive if Bidder fails to provide this completed form with the Bid or submits this form with inaccurate information.

Mandatory qualifications: Specialty Contractor (or Bidder, if self-performing) shall possess a valid Class A, General Engineering Contractor License from California License Board. Califor ia Contractors License at the time of the Bid Deadline and at all times during performance of the Work and shall establish that it satisfactorily completed at least three (3) projects as the installer of a minimum of {Insert description of the work to be performed}; each comparable in scope and complexity to this Project, within three (3) years prior to the Bid Deadline Specialty Contractor Name: _N_/________ A _______________ _ Project Manager/ Foreman: _________________________ _
Phone No: ____________ _ E-mail: --------------
COMPARABLE PROJECTS (Provide three (3))

1. Project Name: _N_/_A ________________________ _
Address: ______________________________
Date Completed: ___________________________ _
Reference/ Contact Name: ________________________ _
Reference / Contact Phone No:------------------------
Description of work performed: ______________________ _ Golden Gate Steel, Inc. dba Golden Gate Construction

Page 196 of 213 ends

2. Project Name: _N_/_A ______________________ _
Address: _____________________________ _
Date Completed: ___________________________ _
Reference I Contact Name: ____________________ _
Reference I Contact Phone No: __ _ ________________ _
Description of work performed: ____________________ _

3. Project Name: _N_/_A _____________________ _
Address: ___________________________ _
Date Completed: _______________________ _
Reference I Contact Name:----------------------
Reference I Contact Phone No:---------------------
Description of work performed: _________________ _ _ _

4. Project Name: _N_/_A ________________ ____ _
Address: ___________________________ _
Date Completed: _________________ _____ _
Reference I Contact Name: _____________________ _
Reference I Contact Phone No: ____________________ _
Description of work performed: ___________________ _
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 197 of 213 ends

CONTRACTOR'S AFFIDAVIT OF NON-COLLUSION

STATE OF CALIFORNIA )
COUNTY OF Los Angeles
) ss
------- )
_
Y_oh_an_n _C_ha_ng ____________ being first duly sworn, deposes and says:

1. That he/she is the President (Title of office if a corporation, "sole owner," "Partner," or other proper title) of Golden Gate Steel. Inc. DBA Golden Gate Construction ' (hereinafter called "Contractor")
who has submi led to the City of Vernon a Bid for the construction of the North Parking Security Fencing Contract No. 20240259

2. That said Bid is genuine; that the same is not sham; that all statements of fact therein are true;

3. That said Bid is not made in the interest or behalf of any person, partnership, company, association, organization, or corporation not named or disclosed;

4. That Contractor did not, directly or indirectly induce, solicit, agree, collude, conspire or contrive with anyone else to submit a false or sham bid, to refrain from bidding, or withdraw his/her bid, to raise or fix the Bid price of Contractor or of anyone else, or to raise or fix any overhead profit, or cost element of Contractor's price or the price of anyone else; and did not attempt to induce action prejudicial to the interests of the City of Vernon, or of any other Bidder, or anyone else interested in the proposed Contract;

5. That the Contractor has not in any manner sought by collusion to secure for himself an advantage over any other Bidders or induce action prejudicial to the interests of the City of Vernon or of any other Bidder, or anyone else interested in the proposed Contract;

6. That the Contractor has not accepted any bid from any Subcontractor or material supplier through any bid depository, the bylaws, rules or regulations of which prohibit or prevent the Contractor from considering any bid from any Subcontractor or material supplier, which is not processed through said bid depository, or which prevent any Subcontractor or material supplier from bidding to any Contractor who does not use the facilities of or accept bids from or through such bid depository; Ill
Ill
Ill
Ill
Ill
Ill
Ill
If I
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 198 of 213 ends

7. That the Contractor did not, directly or indirectly, submit the Contractor's Bid price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any individual or group of individuals, except to the City of Vernon, or to any person or persons who have partners ip or other financial interest with said Contractor in his/her business.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Dated this 27 day of February, 2024 at Norwalk California Month/Year City State
Golden Gate Steel, Inc. OBA Golden Gate Construction
Contractor (Please Print)
Co
President
Title
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 199 of 213 ends

Docu$ign Envelope ID: 76BAEFF0-A81C-4A31-86B2-8263C0FECF2A

THE BIDDER'S INSURANCE COMPANY(S) OR INSURANCE AGENT MUST COMPLE E THIS FORM AND
THE BIDDER MUST SUBMIT THIS CERTIFICATION WITH THE BID FORMS.

I, the undersigned (Please check one box)D underwritei@agent, certify that I and the Contractor listed below have jointly reviewed the "Insurance Requirements" in these Bidding Documents and the Contract Documents. If the City of Vernon ("City") awards the Contractor the Contract for this project, I will be able-within fourteen (14) calendar days after the Contractor is notified of the Contract's award-to furnish the City with valid insurance forms (including one or more insurance certificates and additional insured endorsements) that fully meet all of the Insurance Requirements.

HUB International 2/27/2024
Name of Insurance Company
Anna Joo
Date
Anna Joo
lns Insurance Agent's Name �
nae.A�oo�i Name (Printed)
. al.AJ.M,, JM (si
gnature) _.g6=...,44...,g7..,.._1�4, _______ _
9122 Garden Grove Blvd
Address
714) 537-5000
Telephone Number
Garden Grove CA 92844
City State Zip Code
[email protected]
Email Address
Golden Gate Steel, Inc. OBA Golden Gate Construction
Contractor's Name City Specification Number
Below State the Name of Insurance Company Providing Coverage:

DO NOT write "Will Provide," "To Be Determined," "When Required," or similar phrases.

Gemini Insurance Company California Automobile Insurance Company Commercial General Liability
State Compensation Insurance Fund of California
Workers' Compensation Liability
City Will Purchase Policy, if required
Builders Risk
Automobile Liability
Homeland Insurance Company of New York
Pollution Liability
[NOTE TO CO TRACTOR: See "Insurance Requirements" EXHIBIT 4 of the Contract for the requirement of obtaining Pollution Liability Insurance.]
NOTE TO THE UNDERWRI ER / AGENT: If the insurance forms that the Contractor submits to the City do not fully comply with the Insurance Requirements, and/or if the Contractor fails to submit the forms within the 14-day time limit, the City may: (1) declare the Contractor's Bid non-responsive, and (2) award the Contract to the next lowest responsible Bidder.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 200 of 213 ends

Certificate Of Completion
Envelope Id: 76BAEFF0A81C4A3186B28263C0FECF2A
Subject: Complete with DocuSign: Pages from Bid Form - Insurance (003).pdf Source Envelope:

Document Pages: 1
Certificate Pages: 1
AutoNav: Enabled
Envelopeld Stamping: Enabled
Signatures: 1
Initial.;: 0
Time Zone: (UTC-05:00) Eastern Time (US & Canada)
Record Tracking
Status: Original
2/27/2024 10:34:26 AM
Signer Events
Anna Joo
[email protected]
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:

Not Offered via DocuSign
In Person Signer Events
Editor Delivery Events
Agent Delivery Events
Intermediary Delivery Events
Certified Delivery Events
Carbon Copy Events
Witness Events
Notary Events
Envelope Summary Events
Envelope Sent
Certified Delivered
Signing Complete
Completed
Payment Events
Holder: Anna Joo
[email protected]
Signature
( ��::,;;
DODI 7A44B7 14ED
Signature Adoption: Pre-selectea Style
Using IP Address: 64.14.237.3
Signature
Status
Status
Status
Status
Status
Signature
Signature
Status
Hashed/Encrypted
Security Checked
Security Checked
Security Checked
Status
Status: Completed
Envelope Originator
Anna Joo
300 LaSalle Street
DocuSign
Chicago, IL 60654
anna.joo@hu • ternational.com
IP Address: 64.14.237.3
Location: DocuSign
Timestamp
Sent: 2/27/2024 10:35:14 AM
Viewed: 2/27/2024 10:35:26 AM
Signed: 2/27/2024 10:35:30 AM
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamp
Timestamps
2/27/2024 10:35:14 AM
2/27/2024 10:35:26 AM
2/27/2024 10:35:30 AM
2/27/2024 10:35: 0 AM
Timestamps
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 201 of 213 ends

CERTIFICATE OF EQUAL OPPORTUNITY PRACTICES
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
Website: www.cityl fver on.org
Article I. Affidavit of Equal Opportunity Employment &
Non-segregation (Form AA-1)
Article II. Vendor List Questionnaire (Forms AA-2 & 3)
In order to be placed to the City's vendor list and be eligible to receive City business, you must provide the following information except where indicated as "optional." By submitting this form you are declaring under penalty of perjury under the laws of the State of California and the laws of the United States that the information is true and correct. Furthermore, you are certifying that your firm will adhere to equal opportunity employment practices to assure that applicants and employees are not discriminated against because of their race, religion, color, national origin, ancestry, disability, sex or age. And, your firm does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained.

Name of Comp
any: Goldfln Gate Steel, Inc. OBA Golden Gate Construction Business Telephone: _(5_6_2)2_10_-_81_ _ 08 ______ _
Address: 14709 Carmeni ta Road
City: No rwalk State: _c_A ___ Zip 0650
Contact Person _Y_oh_ann__C_h_ang_� - ---- E-mail Address informfliton,g oldengaet @gmail.com (optional)
Tax ID Number (or Social Security Number) _95_-4_8_01_6_18 _____ _ Remit Address (if different)
N/A
Please state clearly and concisely the type(s) of goods and services your company provides:

General Co nstruc tion
The following section is OPTIONAL and is for statistica reporting purposes only. Ownership (please check all that apply):

African-American__ Asian_x_ Armenian
Disabled __
Hispanic__ Native American __
Female __
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 202 of 213 ends

Project Workforce Utilization (Form AA-2)
This form is to be included in all bid documents for projects involving labor or services valued at $25,000 or more.

Instructions: Please indicate the job titles/classifications to be used in the performance of this contract should it be awarded to your firm. Please indicate the number of employees in each job classification as well as the number of new hires, if any1 as a result of this contract. f Golden Gate Steel. Inc. OBA Golden Gate Construction . North Parking Security Fencing Name o Company: __________________ ProJect: - - • Job Titles/Classification Estimated number of existing staff to be employed in Estimated number of new hires to be employed in this classification if awarded the contract this classification if awarded the contract Wrought Iron Fence. Gates. & Appurtenants 2 0
I
Are any current employees or potential No No new hires Vernon residents? If so, how many?
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 203 of 213 ends

Current Permanent Workforce Utilization (Form AA-3)
Name of Company: Golden Gate Steel, Inc. DBA Golden Gate Construction Project: North Parking Security Fencing
Completion of this form is OPTIONAL. Any information supplied by vendors is for reporting purposes only and will not be factored into the award of any contract.

Instructions: Please indicate the number of employees in each Job Classification belonging to the following groups.

White African-American Hispanic Asian/Pacific Native Armenian Male Female (not of Hispanic (not of Hispanic Islander American
origin) origin)

CLASSIFICATION
Officials/ 2 Managers
Professionals 3
Technicians 1 2
Office/Clerical 3
Skilled Craft Workers 1
Operators
(semi-skilled)
Laborers 3
Service Workers
TOTAL 5 10
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 204 of 213 ends

Attachment #1 / Experience 3.4
Government Contract
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Rancho Cucamonga Civic Center ADA and Covid Improvement Project 10500 Civic Center Drive Rancho Cucamonga, CA 91730
City of Rancho Cucamonga
Shane Adams (Fire Prevention Supervisor)
(909) 477-2770 Ext.3027
$753,620.00
9/14/2021
8/19/2022
Moreno Valley Civic Center Demonstration Garden
14075 Frederick St. Moreno Valley, CA 92553
City of Moreno Valley
Henry Ngo (Capital Projects Division Manager)
(951) 413-3190
$458,232.00
3/29/2021
1/28/2022
Costal Bluff Fence Replacement @ Rancho Palos Verdes
Terrace Trail/ Seasscape Taril
City of Rancho Palos Verdes
Lauren Ramezani
(310) 544-5245
$267,490.00
6/15/2020
2/16/2021
Dee Hardison Sports Center Restroom Renovation
2400 Jefferson St. Torrance, CA 90501
City of Torrance
Nina Schroeder
(310) 781-7151
$226,168.00
6/8/2020
10/20/2020
Hale Building Interior Remodel
175 North Garfield Ave., Pasadena, CA 91101
City of Pasadena
James Tong (Project Engineer)
(626) 744-3971 (Main)/ (661) 510-2312 (Cell)
$468,526.00
7/15/2019
9/4/2019
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 205 of 213 ends

Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Wagner House Voluntary Accessibility Improvement
975 S State College Blvd. Anaheim, CA 92806
City of Anaheim
Robert Palaeologus (Contract Administrator)
(562) 493-6919
$1,257,191.86
10/22/2018
2/19/2020
City of Industry - Phase 1 Hudson (VAL) Building Tl
205 N. Hudson Avenue, City of Industry, CA 91744
City of Industry
Gerry Perez (Construction Manager)
(626} 956-8034
$204,298.00
3/26/2018
6/15/2019
CGC Cafe & Conference Rooms
385 North Arrowhead Avenue, San Bernardino, CA 92415
County of San Bernardino
Brenton Rankin (Project Manager)
(909) 771-1168
$1,194,500.00
3/19/2018
12/28/20 8
Murrieta Senior & Community Center
1 Town Square, Murrieta, CA 92562
City of Murrieta
Bryan Tuschhoff
(949) 300-3888 (Cell)/ (951) 461-6115 (Direct)
$575,719.00
10/11/2017
1/11/2018
Senior Center Courtyard Renovation
Senior Center, Culver City, 4095 Overland Ave., Culver City, CA 90232 City of Culver City
Reny Quijano (No longer works) New guy: Javier De La Cruz (Associate Engineer) (310) 253-5606
$299,014.00
8/31/2017
12/1/2017
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 206 of 213 ends

Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Project Name
Project Address
Government Agency
Cantact Name
Phone No.

Contract Amount
Conatrct's Statring Date
Contract's Ending Date
Rancho Cucamonga Animal Care & Adoption Center Ma eover Project 11780 Arrow Route, Rancho Cucamonga, CA 91730
City of Rancho Cucamonga
Kenneth Fung (Assistant Engineer)
(909) 477-2730 Ext.4139
$547,311.60
2/6/2017
7/20/2017

PARKVIEW VILLAS INTERIOR UNIT RENOVATION AND INSTALLATIONCONSTRUCTIOI 71740 San Jacinto Drive in the City of Rancho Mirage
Cify of Rancho Mirage
Joseph Carpenter (Finance Manager)
(760) 770-3210 Ext.274
$464,000.00
7/8/2016
4/30/2017
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 207 of 213 ends

Attachment #2 / Experience 3.5
Stephen Lim
15 I 18 Wilder Ave.

Norwalk, CA 90650
Executive Summary
Phone:562-229-0405
Cell: 310-487-7997
Email: [email protected]
Skilled Operation Manager with solid experience managing all levels of multiple projects including budgeting and administration
Core Qualification
• Employee scheduling
• Planning and estimating
• Consistently meet goals
• Public relations
• Budget development
Professional Experience
Project Manager/ Superintendent
Golden Gate Construction, Inc
San Bernardino County Project - 2018'
City of Industry Tl Project - 2018'
City of San Jacinto Tl Project - 2018'
City of Pasadena Tl Project - 2019'
Glendale USD Maintenance Yard Project - 2019'
Balboa Elementary School Project - 2019'
Orange Coast College Green House Project - 2019'
• Purchasing
• Cost reductions
• Quality management
• Inventory control
• Labor cost control
Rancho Santiago Community College ADA Barrier Removal Project - 2020' OCTA HVAC Replacement Project, Garden Grove Bus Base - 2020' Anaheim Wagner House Tl Project - 2020'
Rancho Palos Verdes Costa! Fence Project 2020'
Torrance Dee Hardison Sports Center Restroom Project - 2020' OCTA HVAC Replacement Project, Anaheim Bus Base - 2020' OCT A Shop Floor Restoration at Garden Grove Bus Base - 2020' Omnitrans Concrete Repairs at West Valley Facility 2020' Project Manager/ Superintendent
Cooland, Inc
Public and Private at Various Locatoins
Project Manager/ Superintendent
Exbon Development, Inc
March Air Force Reserve Base - IDIQ
Nellis Air Force Base - IDIQ
Creech Air Force Base - IDIQ
Tonopah Air Force Base - IDIQ
USPS - Waterproofing and Replacing Rool
Menifee Middle School - Single Ply TPO New Roof
Orange County Parks and Recreation - Replacing Skylight and Tile Roof 02/2018- Present
Norwalk, CA
08/2013 -02/2018
Gardena, CA
07/2008- 03/2011
Garden Grove, CA
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 208 of 213 ends

Project Manager
Angeles Contractor, Inc
USPS - JOC for Various Locations
Public Schools for Various Locations
LA County Parks & Recreation for Various Locations
Education
California State Polytechnic University, Pomona
Bachelor of Science - Construction Engineering Technology Skills
Computer Programs : MS Office, MS Project
OHSA 30 Certificate
04/1998 - 08/2007
Buena Park, CA
1997
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 209 of 213 ends

PUBLIC WORKS

DEPARTMENT
4305 Santa Fe t\vcnuc, Vernon, California
90058 Telephone (323) 583-8811
February 21, 2024
NOTICE TO BIDDERS-ADDENDUM NO. I

NIB FOR
Via Planetbids
NORTH PARKING SECURITY FE CING ,ONTRACTNO. 20240259
This notice shall be considered as Addendum No. I to the Notice Inviting Bids for the prqject mentioned above, and the original Contract Documents will be modified, as noted below. Portions of the Contract not specifically mentioned in the Addendum remain in force. This infonnational notice is to provide clarification to questions that have arisen during the advertisement. The questions and responses are the following:

In the bid spe itication, the following items arc to be amended as follow:

I. Exhibit D NORTI I PARKING STRUCTURE SEC RITY FE CIN 1 PLANS Questions & Ans\\'ers

1. As I reviewed the NIB, the required contractor's license is "A. What if we have a contractor's license with B and additionally, C8, C23, C27, CSl, C61/D28 & D39? May we participate in this project?
A contractor wit a Contractor B license and additional specialties licenses can be substituted for the required Class A license. Therefore, they are allowed to participate in the project.

2. Please Confirm new (2) Rolling Gates & (2) Swing Gates will be Motorized and require keypads.

The rolling gate (2) and swing gate (2) are required to be motorized, and new keypads are needed for the west and east entrances of the parking structure.

3. During the job walk, the project manager informed us that Power for (4) Motors will be ready by the City. Will the City make its final connection to each motor, or will a Contractor make the final connection?
The City of Vernon will run the line and provide power to the preferred location that the contractors indicate. The contractor should make the final connection and make sure everything runs correctly.

Golden Gate Steel, Inc. dba Golden Gate Construction

Page 210 of 213 ends

4. During the job walk, the owner informed us that contractors may choose an option to install a (N) chain-link fence on the (E) low wall. Please confirm.

The chain-link fence installed to enclose the two upper staircases should be bolted onto the low wall or the parking structure deck (next to the (E) low wall). Whichever the contractor decides, it shou d meet the requirements. Please refer to special provisions and plans for specific details.

5. Please Confirm that (N) Chain-Link Fence is required for the Top-Cover by chain-Link for complete enclosure (Ref. Note. 9)
The chain-link fence for the staircase requires a Chain-link top cover so that the cage is fully enclosed.

6. Is (N) Wrought Iron Fence required Galvanizing before the Powder Coating? Galvanizing the wrought Iron Fence is not required, but Power coating is mandatory.

7. Notes 5 & 6 stated, "4" Concrete Slab for Rolling Gate Anchoring." Please confirm this (N) concrete slab is under (N) V-Track, & No concrete footing is required.

The new concrete slab is for the v-track for the new motorized rolling gate 2), and no footing is required.

8. What is the Post Spacing for (N) Wrought Iron Fence Posts? The post spacing for new wrought iron fence posts is typically 8 feet apart.

9. When is the project commencing date (NTP)?
The commencing date is sometime i late April or Early May.

10. How can we protect the working area from the Pedestrians? May we use Delineators with Caution Tapes?
A small portion of the construction zone is open to the public. Most of the pedestrians at city hall are city employees or visitors. Delineators with caution tape are okay to keep everyone away.

11. Is using 10' post spacing for (N) Chain-Link fences acceptable? Otherwise, provide details on the Wall & Top Panel's Posts & Support Pipes.

Using 10' post spacing for the new chain link fence is acceptable.

12. Is a Builder's Risk Insurance coverage required under this project? Builder's Risk Insurance Coverage is Required for thi� project.

13.ls a Maintenance Bond required under this project?
A maintenance bond is required for this project.

14. There is a "Notification of Affected Residents/Businesses" requirement in the General Conditions. Is this requirement required in this project? Golden Gate Steel, Inc. dba Golden Gate Construction

Page 211 of 213 ends

A "Notification of Affected Resident/ Businesses" requirement in the General Condition is not required since all the work being completed would be in City Hall.

If you have any questions, please get in touch with Carlos Velazquez, one ofmy staff, at (323) 583-881 I extension 526 or at [email protected].

Sincerely,
Daniel Wall, P.E.

Director of Public Works
Golden Gate Steel, Inc. dba Golden Gate Construction

Page 212 of 213 ends

STANDARD SYMBOLS CITY OF VERNON PUBLIC WORKS DEPARTMENT NORTH PARKING STRUCTURE SECURITY FENCINGSCALE: 1"=20' TE E NORTH PARKING STRUCTURE SECURITY FENCING & GATES 1 1 VW INSTALLATION NOTES: 1234576 DETAIL B. STAIRCASE DETAIL: (NOT TO SCALE) 810 B 9 V W LANDSCAPE 14' 14' STOP 12' 12' LEGEND DETAIL C. CUSTOM OPENING: (NOT TO SCALE) C 80' C DETAILS 3'-3" 4'-9" E E E EXISTING WALKWAY E 10' 14' EXISTING WALKWAY 25' 50' 30' C INSTALLATION QUANTITIES QUANTITY UNIT RESTRIPING NOTE 6' 45' 35' 6' C C Golden Gate Steel, Inc. dba Golden Gate Construction