SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND PACIFIC ADVANCED CIVIL ENGINEERING, INC. (PACE) FOR SOURCE WATER QUALITY

ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

COVER PAGE
Contractor: Pacific Advanced Civil Engineering, Inc.

Responsible Principal of Contractor: Duncan S. Lee, PE, Principal, QA/QC Manager – Utilities Division
Notice Information - Contractor: Pacific Advanced Civil Engineering, Inc. 17520 Newhope Street, Suite 200
Fountain Valley, CA 92708
Attention: Duncan S. Lee, PE, Principal,
QA/QC Manager – Utilities
Division
Telephone: (714) 481-7300
Notice Information - City: City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Attention: Todd Dusenberry,
General Manager of Vernon
Public Utilities
Telephone: (323) 583-8811 ext. 579
Commencement Date: March 17, 2025
Termination Date: March 16, 2028
Consideration: Total not to exceed $716,040 (includes all applicable sales tax); and more particularly
described in Exhibit B
Records Retention Period Three (3) years, pursuant to Section 11.20

SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND PACIFIC ADVANCED CIVIL ENGINEERING, INC. (PACE) FOR SOURCE WATER QUALITY ASSESSMENT AND

DESIGN OF TREATMENT FACILITIES
This Agreement is made between the City of Vernon, a California charter City and California municipal corporation (“City”), and Pacific Advanced Civil Engineering, Inc. (PACE), a California corporation (“Contractor”).

The City and Contractor agree as follows:

1.0 EMPLOYMENT OF CONTRACTOR. City agrees to engage Contractor to perform the services as hereinafter set forth as authorized by the City Council on March 4, 2025.

2.0 SCOPE OF SERVICES.

2.1 Contractor shall perform all work necessary to complete the services set forth in the City’s Request for Proposals issued on or about October 2, 2024, and titled RFP for Source Water Quality Assessment and Design of Treatment Facilities, and Contractor's proposal to the City ("Proposal") dated October 28, 2024, Exhibit “A”, a copy which is attached to and incorporated into this Agreement by reference.

2.2 All services shall be performed to the satisfaction of City.

2.3 All services shall be performed in a competent, professional, and satisfactory manner in accordance with the prevailing industry standards for such services.

3.0 PERSONNEL.

3.1 Contractor represents that it employs, or will employ, at its own expense, all personnel required to perform the services under this Agreement.

3.2 Contractor shall not subcontract any services to be performed by it under this Agreement without prior written approval of City.

3.3 All of the services required hereunder will be performed by Contractor or by City approved subcontractors. Contractor, and all personnel engaged in the work, shall be fully qualified and authorized or permitted under State and local law to perform such services and shall be subject to approval by the City.

4.0 TERM. The Contractor shall commence the delivery of services on receipt of a written notice to proceed and shall complete the services on the schedule set forth in Exhibit “B”.

5.0 COMPENSATION AND FEES.

5.1 Contractor has established rates for the City of Vernon which are comparable to and do not exceed the best rates offered to other governmental entities in and

around Los Angeles County for the same services. For satisfactory and timely performance of the services, the City will pay Contractor in accordance with the payment schedule set forth in Exhibit “B” attached hereto and incorporated herein by reference.

5.2 Contractor's grand total compensation for the entire term of this Agreement, shall not exceed $716,040 without the prior authorization of the City, as appropriate, and written amendment of this Agreement.

5.3 Contractor shall, at its sole cost and expense, furnish all necessary and incidental labor, material, supplies, facilities, equipment, and transportation which may be required for furnishing services pursuant to this Agreement. Materials shall be of the highest quality. The above Agreement fee shall include all staff time and all clerical, administrative, overhead, insurance, reproduction, telephone, air travel, auto rental, subsistence, and all related costs and expenses.

5.4 City shall reimburse Contractor only for those costs or expenses specifically approved in this Agreement, or specifically approved in writing in advance by City.

Unless otherwise approved, such costs shall be limited and include nothing more than the following costs incurred by Contractor:

5.4.1 The actual costs of subcontractors for performance of any of the services that Contractor agrees to render pursuant to this Agreement, which have been approved in advance by City and awarded in accordance with this Agreement.

5.4.2 Approved reproduction charges.

5.4.3 Actual costs and/or other costs and/or payments specifically authorized in advance in writing and incurred by Contractor in the performance of this Agreement.

5.5 Contractor shall not receive any compensation for extra work performed without the prior written authorization of City. As used herein, “extra work” means any work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the time of execution of this Agreement. Compensation for any authorized extra work shall be paid in accordance with the payment schedule as set forth in Exhibit “B,” if the extra work has been approved by the City.

5.6 Licenses, Permits, Fees, and Assessments. Contractor shall obtain, at Contractor’s sole cost and expense, such licenses, permits, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and

interest, which may be imposed by law and which arise from or are necessary for the performance of the Services by this Agreement.

6.0 PAYMENT.

6.1 As scheduled services are completed, Contractor shall submit to the City an invoice for the services completed, authorized expenses, and authorized extra work actually performed or incurred according to said schedule.

6.2 Each such invoice shall state the basis for the amount invoiced, including a detailed description of the services completed, the number of hours spent, reimbursable expenses incurred and any extra work performed.

6.3 Contractor shall also submit a progress report with each invoice that describes in reasonable detail the services and the extra work, if any, performed in the immediately preceding calendar month.

6.4 Contractor understands and agrees that invoices which lack sufficient detail to measure performance will be returned and not processed for payment.

6.5 City will pay Contractor the amount invoiced within thirty (30) days after the City approves the invoice.

6.6 Payment of such invoices shall be payment in full for all services, authorized costs, and authorized extra work covered by that invoice.

7.0 CITY'S RESPONSIBILITY. City shall cooperate with Contractor as may be reasonably necessary for Contractor to perform its services; and will give any required decisions as promptly as practicable so as to avoid unreasonable delay in the progress of Contractor's services.

8.0 COORDINATION OF SERVICES. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City’s staff, consultants, and other staff at all reasonable times.

9.0 INDEMNITY. Contractor agrees to indemnify City, its officers, elected officials, employees and agents against, and will hold and save each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities (herein “claims or liabilities”), including but not limited to professional negligence, that may be asserted or claimed by any person, firm or entity arising out of or in connection with the work, operations or activities of Contractor, its agents, employees, subcontractors, or invitees, provided for herein, or arising from the acts or omissions of Contractor hereunder, or arising from Contractor’s performance of or failure to perform any term, provision, covenant or condition of this Agreement, except to the extent such

claims or liabilities arise from the gross negligence or willful misconduct of City, its officers, elected officials, agents or employees.

10.0 INSURANCE. Contractor shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representative, or employees. The policies shall state that they afford primary coverage.

10.1 Automobile Liability Insurance – Primary insurance coverage shall be written on ISO Business Auto coverage form for all owned, hired, and non-owned automobiles or any auto.

The policy shall have a combined single limit of not less than one million dollars ($1,000,000). If Contractor is transporting one or more non-employee passengers in the performance of the services, the automobile liability policy shall have a combined single limit of two million dollars ($2,000,000). If Contractor owns no autos, a hired, non-owned auto endorsement to the General Liability policy is acceptable.

10.1.1 Contractor agrees to subrogate automobile liability resulting from performance under this agreement by agreeing to defend, indemnify, and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”), which are attributable to any act or omission by the Contractor under the performance of the services. The City of Vernon, its directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the policy as additional insureds and, under the Contractors’ policy, there shall be a waiver of subrogation, and the policy shall be primary and non-contributory and will not seek contribution from the City’s insurance.

10.2 Commercial General Liability Insurance – Contractor shall carry General Liability Insurance covering all operations performed by or on behalf of the Contractor providing coverage for bodily injury and property damage with a single limit of not less than one million dollars ($1,000,000) per occurrence and two million dollars ($2,000,000) general aggregate limit written on an Insurance Services Office (ISO) Comprehensive General Liability "occurrence" Form CG 00 01 or its equivalent for coverage on an occurrence basis. The City of Vernon, its directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the policy as additional insureds with respect to liability arising out of the Contractor's performance of this Agreement. The additional insured coverage under the Contractor’s policy shall be

primary and non-contributory and will not seek contribution from the City’s insurance. The policy shall be endorsed to include a waiver of subrogation.

10.2.1 If Contractor intends to employ other contractors as part of the services rendered, the City must approve and will establish the appropriate insurance requirements.

10.2.2 Contractor agrees to subrogate General Liability resulting from performance under this agreement by agreeing to defend, indemnify, and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”), which are attributable to any act or omission by the Contractor under the performance of the services.

10.3 Professional Errors and Omissions Coverage in a sum of not less than one million dollars ($1,000,000), where such risk is applicable. Applicable aggregate must be identified and claims history provided to determine amounts remaining under the aggregates.

Contractor shall maintain such coverage for at least one (1) year after the termination of this agreement.

10.4 Umbrella Liability Insurance – An umbrella (over primary) may be used to comply with limits or other primary coverage requirements. When used, the umbrella policy shall apply to bodily injury/property damage and personal injury/advertising injury and shall include a “dropdown” provision providing primary coverage for any liability not covered by the primary policy. The umbrella policy shall have no additional exclusion or coverage difference from the primary policy. The coverage shall also apply to automobile liability.

10.5 Workers’ Compensation/Employers Liability - Contractor shall comply with the applicable sections of the California Labor Code concerning workers' compensation for injuries on the job. Compliance is accomplished in one of the following manners:

10.5.1 Provide a copy of the permissive self-insurance certificate approved by the State of California; or

10.5.2 Secure and maintain in force a policy of workers' compensation insurance with statutory limits and Employer's Liability Insurance with a limit of one million dollars ($1,000,000) per accident. The policy shall be endorsed to waive all rights of subrogation against City, its directors, commissioners, officers, employees, and volunteers for losses arising from performance of this Agreement or

10.5.3 If Contractor has no employees, it may certify or warrant to the City that it does not currently have any employees or individuals who are defined as “employees” under the Labor Code, and the requirement for Workers’ Compensation coverage will be waived by completing the waiver form provided by the City.

10.6 If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

10.7 Each insurance policy included in this clause shall be endorsed to state that coverage shall not be cancelled except after thirty (30) days prior written notice to City.

10.8 Insurance shall be placed with insurers with an A.M. Best rating of no less than A-VIII. Any self-insured retention or deductible in excess of $25,000 must be approved in advance by the City. Any policies written on a claims-based basis must include a minimum of a 3-year tail.

10.9 Prior to the commencement of performance, Contractor shall furnish City with a certificate of insurance for each policy. Each certificate is to be signed by a person authorized by that insurer to evidence coverage on its behalf. The certificate(s) must be in a form approved by City. City may require complete, certified copies of any or all policies upon request.

10.10 Failure to maintain required insurance at all times shall constitute a default and material breach. In such event, Contractor shall immediately notify City and cease all performance under this Agreement until further directed by the City. In the absence of satisfactory insurance coverage, City may, at its option: (a) procure insurance with collection rights for premiums, attorney's fees, and costs against Contractor by way of set-off or recoupment from sums due to Contractor, at City's option; (b) immediately terminate this Agreement and seek damages from the Agreement resulting from said breach; or (c) self-insure the risk, with all damages and costs incurred, by judgment, settlement or otherwise, including attorney's fees and costs, being collectible from Contractor, by way of set-off or recoupment from any sums due to Contractor.

11.0 GENERAL TERMS AND CONDITIONS.

11.1 INDEPENDENT CONTRACTOR.

11.1.1 It is understood that in the performance of the services herein provided for, Contractor shall be, and is, an independent contractor, and is not an agent, officer or employee of City and shall furnish such services in its own manner and method except as

required by this Agreement, or any applicable statute, rule, or regulation. Further, Contractor has and shall retain the right to exercise full control over the employment, direction, compensation and discharge of all persons employed by Contractor in the performance of the services hereunder. City assumes no liability for Contractor’s actions and performance, nor assumes responsibility for taxes, bonds, payments, or other commitments, implied or explicit, by or for Contractor. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its employees, subcontractors and independent contractors, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever.

11.1.2 Contractor acknowledges that Contractor and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of the City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits.

11.2 CONTRACTOR NOT AGENT. Except as the City may authorize in writing, Contractor and its subcontractors shall have no authority, express or implied, to act on behalf of or bind the City in any capacity whatsoever as agents or otherwise.

11.3 OWNERSHIP OF WORK. All documents and materials furnished by the City to Contractor shall remain the property of the City and shall be returned to the City upon termination of this Agreement. All reports, drawings, plans, specifications, computer tapes, floppy disks and printouts, studies, memoranda, computation sheets, and other documents prepared by Contractor in furtherance of the work shall be the sole property of City and shall be delivered to City whenever requested at no additional cost to the City. Contractor shall keep such documents and materials on file and available for audit by the City for at least three (3) years after completion or earlier termination of this Agreement. Contractor may make duplicate copies of such materials and documents for its own files or for such other purposes as may be authorized in writing by the City.

11.4 CORRECTION OF WORK. Contractor shall promptly correct any defective, inaccurate or incomplete tasks, deliverables, goods, services and other work, without additional cost to the City. The performance or acceptance of services furnished by Contractor shall not relieve the Contractor from the obligation to correct subsequently discovered defects, inaccuracy, or incompleteness.

11.5 RESPONSIBILITY FOR ERRORS. Contractor shall be responsible for its work and results under this Agreement. Contractor, when requested, shall furnish clarification and/or explanation as may be required by the City, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Contractor occurs, then Contractor shall, at no cost to City, provide all necessary design drawings, estimates and other Contractor professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction.

11.6 WAIVER. The City's waiver of any term, condition, breach, or default of this Agreement shall not be considered to be a waiver of any other term, condition, default or breach, nor of a subsequent breach of the one waived. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance.

No waiver of any provision of this Agreement shall be effective unless in writing and executed by a duly authorized representative of the party against whom enforcement of a waiver is sought.

11.7 SUCCESSORS. This Agreement shall inure to the benefit of, and shall be binding upon, the parties hereto and their respective heirs, successors, and/or assigns.

11.8 NO ASSIGNMENT. Contractor shall not assign or transfer this Agreement or any rights hereunder without the prior written consent of the City and approval by the City Attorney, which may be withheld in the City's sole discretion. Any unauthorized assignment or transfer shall be null and void and shall constitute a material breach by the Contractor of its obligations under this Agreement. No assignment shall release the original parties from their obligations or otherwise constitute a novation.

11.9 COMPLIANCE WITH LAWS. Contractor shall comply with all Federal, State, County and City laws, ordinances, rules and regulations, which are, as amended from time to time, incorporated herein and applicable to the performance hereof. Violation of any law material to performance of this Agreement shall entitle the City to terminate the Agreement and otherwise pursue its remedies. Further, if the Contractor performs any work knowing it to be contrary to such laws, rules, and regulations Contractor shall be solely responsible for all costs arising therefrom.

11.10 ATTORNEY'S FEES. If any action at law or in equity is brought to

enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, costs, and necessary disbursements in addition to any other relief to which such party may be entitled.

11.11 INTERPRETATION.

11.11.1 Applicable Law. This Agreement shall be deemed an agreement and shall be governed by and construed in accordance with the laws of the State of California. Contractor agrees that the State and Federal courts which sit in the State of California shall have exclusive jurisdiction over all controversies and disputes arising hereunder, and submits to the jurisdiction thereof.

11.11.2 Entire Agreement. This Agreement, including any exhibits attached hereto, constitutes the entire agreement and understanding between the parties regarding its subject matter and supersedes all prior or contemporaneous negotiations, representations, understandings, correspondence, documentation, and agreements (written or oral).

11.11.3 Written Amendment. This Agreement may only be changed by written amendment executed by Contractor and the City Administrator or other authorized representative of the City, subject to any requisite authorization by the City Council. Any oral representations or modifications concerning this Agreement shall be of no force or effect.

11.11.4 Severability. If any provision in this Agreement is held by any court of competent jurisdiction to be invalid, illegal, void, or unenforceable, such portion shall be deemed severed from this Agreement, and the remaining provisions shall nevertheless continue in full force and effect as fully as though such invalid, illegal, or unenforceable portion had never been part of this Agreement.

11.11.5 Order of Precedence. In case of conflict between the terms of this Agreement and the terms contained in any document attached as an Exhibit or otherwise incorporated by reference, the terms of this Agreement shall strictly prevail. The terms of the City’s Request for Proposals shall control over the Contractor’s Proposal.

11.11.6 Construction. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement.

11.12 TIME OF ESSENCE. Time is strictly of the essence of this agreement and each and every covenant, term, and provision hereof.

11.13 AUTHORITY OF CONTRACTOR. The Contractor hereby represents and warrants to the City that the Contractor has the right, power, legal capacity, and authority to enter into and perform its obligations under this Agreement, and its execution of this Agreement has been duly authorized.

11.14 ARBITRATION OF DISPUTES. Any dispute for under $25,000 arising out of or relating to the negotiation, construction, performance, non-performance, breach, or any other aspect of this Agreement, shall be settled by binding arbitration in accordance with the Commercial Rules of the American Arbitration Association at Los Angeles, California and judgment upon the award rendered by the Arbitrators may be entered in any court having jurisdiction thereof. The City does not waive its right to object to the timeliness or sufficiency of any claim filed or required to be filed against the City and reserves the right to conduct full discovery.

11.15 NOTICES. Any notice or demand to be given by one party to the other must be given in writing and by personal delivery or prepaid first-class, registered or certified mail, addressed as follows. Notice simply to the City of Vernon or any other City department is not adequate notice.

If to the City:

City of Vernon
Attention: Todd Dusenberry, General Manager of Vernon Public Utilities 4305 Santa Fe Avenue
Vernon, CA 90058
If to the Contractor:

Pacific Advance Civil Engineering, Inc.

Attention: Duncan S. Lee, PE
Principal, QA/QC Manager – Utilities Division
17520 Newhope Street, Suite 200
Fountain Valley, CA 92708
Any such notice shall be deemed to have been given upon delivery, if personally delivered, or, if mailed, upon receipt, or upon expiration of three (3) business days from the date of posting, whichever is earlier. Either party may change the address at which it desires to receive notice upon giving written notice of such request to the other party.

11.16 NO THIRD PARTY RIGHTS. This Agreement is entered into for the sole benefit of City and Contractor and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right or remedy in, under, or to this Agreement.

11.17 TERMINATION FOR CONVENIENCE (Without Cause). City may terminate this Agreement in whole or in part at any time, for any cause or without cause, upon fifteen (15) calendar days' written notice to Contractor. If the Agreement is thus terminated by City for reasons other than Contractor's failure to perform its obligations, City shall pay Contractor a prorated amount based on the services satisfactorily completed and accepted prior to the effective date of termination. Such payment shall be Contractor's exclusive remedy for termination without cause.

11.18 DEFAULT. In the event either party materially defaults in its obligations hereunder, the other party may declare a default and terminate this Agreement by written notice to the defaulting party. The notice shall specify the basis for the default. The Agreement shall terminate unless such default is cured before the effective date of termination stated in such notice, which date shall be no sooner than ten (10) days after the date of the notice. In case of default by Contractor, the City reserves the right to procure the goods or services from other sources and to hold the Contractor responsible for any excess costs occasioned to the City thereby. Contractor shall not be held accountable for additional costs incurred due to delay or default as a result of Force Majeure. Contractor must notify the City immediately upon knowing that non-performance or delay will apply to this Agreement as a result of Force Majeure. At that time Contractor is to submit in writing a Recovery Plan for this Agreement. If the Recovery Plan is not acceptable to the City or not received within 10 days of the necessary notification of Force Majeure default, then the City may cancel this order in its entirety at no cost to the City, owing only for goods and services completed to that point.

11.19 TERMINATION FOR CAUSE. Termination for cause shall relieve the terminating party of further liability or responsibility under this Agreement, including the payment of money, except for payment for services satisfactorily and timely performed prior to the service of the notice of termination, and except for reimbursement of (1) any payments made by the City for service not subsequently performed in a timely and satisfactory manner, and (2) costs incurred by the City in obtaining substitute performance. If this Agreement is terminated as provided herein, City may require, at no additional cost to City, that Contractor provide all finished or unfinished documents, data, and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request.

11.19.1 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

11.20 MAINTENANCE AND INSPECTION OF RECORDS.

The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor's records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the Agreement and/or is paying only the amounts to which Contractor is properly entitled under the Agreement or for other purposes relating to the Agreement.

The Contractor shall maintain and preserve all such records for a period of at least three (3) years after termination of the Agreement.

The Contractor shall maintain all such records in the City of Vernon. If not, the Contractor shall, upon request, promptly deliver the records to the City of Vernon or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location other than the City of Vernon, including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals, and overhead.

11.21 CONFLICT. Contractor hereby represents, warrants, and certifies that no member, officer, or employee of the Contractor is a director, officer, or employee of the City of Vernon, or a member of any of its boards, commissions, or committees, except to the extent permitted by law.

11.22 HEADINGS. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement.

11.23 ENFORCEMENT OF WAGE AND HOUR LAWS. Eight hours labor constitutes a legal day's work. The Contractor, or subcontractor, if any, shall forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the respective Contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Sections 1810 through 1815 of the California Labor Code as a penalty paid to the City; provided, however, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon compensation for all hours worked in excess of 8 hours per day at not less than 1½ times the basic rate of pay.

11.24 EQUAL EMPLOYMENT OPPORTUNITY PRACTICES. Contractor certifies and represents that, during the performance of this Agreement, it and any other parties with whom it may subcontract shall adhere to equal employment opportunity practices to assure that applicants, employees and recipients of service are treated equally and are not discriminated against because of their race, religion, color, national origin, ancestry, disability, sex, age, medical condition, sexual orientation or marital status. Contractor further certifies that it will not maintain any segregated facilities. Contractor further agrees to comply with The Equal Employment Opportunity Practices provisions as set forth in Exhibit “C”. [Signatures Begin on Next Page].

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the Commencement Date stated on the cover page.

City of Vernon, a California charter City
and California municipal corporation
By: ____________________________
Brian Saeki, City Administrator

Pacific Advanced Civil Engineering, Inc.
(PACE), a California corporation
By:

Name:

Title:

ATTEST:
_______________________________
Yonnie Parker, Deputy City Clerk
By:

Name:

Title:

APPROVED AS TO FORM:
_______________________________
Zaynah N. Moussa,
City Attorney
Duncan Lee, PE VP, Utilities Division Secretary Mark Krebs Corporate Secretary

EXHIBIT A

CONTRACTOR'S PROPOSAL

C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES contents

COVER LETTER

INTRODUCTION
» Project Understanding ...................................................................................................................................................1 » Project Approach .............................................................................................................................................................. 2 GENERAL SCOPE OF WORK ........................................................................................................7

WORK PLAN
» Scope of Work ....................................................................................................................................................................8 » Project Schedule ............................................................................................................................................................ 10 FEES & COSTS ....................................................................................................... Submitted Separately

ABILITY OF THE PROPOSER TO PERFORM
» Team Member Qualifications
• About PACE ................................................................................................................................................................. 11 • Key Qualifications ..................................................................................................................................................... 12 Subconsultants • .............................................................................................................................................................13 » Organizational Chart.................................................................................................................................................... 14 » Team Member Resume Table ...................................................................................................................................14 » Project Experience ........................................................................................................................................................ 17 » References ........................................................................................................................................................................ 20

APPENDIX
» 1. Approach Concepts
» 2. Resumes » 3. Affidavit of Non-Collusion
» 4. Sample Work Products

COVER LETTER
Joanna,
Thank you for the opportunity to provide our proposal to the City of Vernon (City) in response to the Public Utilities Department (PUD) Request for Proposal (RFP) for the Source Water Quality Assessment and Design of Treatment Facilities Project (Project). We understand the City, which owns the Vernon Public Utilities (VPU) that offers both wet and dry utilities to its customers, desires to contract a consultant with expertise in potable water wells to ensure a successful well water quality assessment and design up to two treatment facility systems to remove/reduce manganese, with the possibility to also remove/reduce iron and perfluorooctane sulfonate (PFOS). The City is open to seeking a creative approach to meet the Project objectives, which may or may not include “blending” to meet water quality parameters.

As a highly specialized water engineering company, PACE proposes to support the City by developing a thoughtful assessment and design approach that can meet the Project objectives, minimize liabilities to stakeholders, evaluate alternatives at a high-level master plan perspective, reduce impacts and costs, provide the greatest level of operational flexibility, address challenges, and consider future improvement projects.

We understand from the Water System Schematic Diagram in the RFP Exhibit C that the water system consists of seven active wells, one other (No. 14 as Standby), a 10-million-gallon (MG) reservoir, six 1 MG tanks, a 0.6 MG elevated storage tank, three booster pump stations, and one MWD import connection. According to the City’s website, the water system also consists of 49 miles of transmission and distribution mains. Currently, the City believes manganese is the primary concern, as historical water quality data indicates that all seven wells either have elevated concentration levels or have exceeded the Secondary Drinking Water Standard limit of 0.05 milligrams per liter (mg/L). However, there are also elevated levels of iron in at least three wells (Nos. 12, 19, and 22), and PFOS levels are near the federal Maximum Contaminant Level (MCL) at one well (No. 20).

PACE is familiar with the City’s water system infrastructure and current water quality concerns, as we helped evaluate and design the City’s newest and largest producing well, Well No. 22, located on 50th Street. This newest City water well sits on a very small and narrow footprint. According to the Final Well Design Memorandum by Richard C. Slade & Associates dated January 7, 2020, the well has six different aquifer zones. Four of the six zones exceed the iron Secondary Limit of

0.3 mg/L, and three of the six zones exceed the manganese Secondary Limit of 0.05 mg/L. The City should anticipate construction costs alone for the treatment system at each well to range from $4M to $5M.

SOME OF OUR PRELIMINARY OBSERVATIONS AND APPROACHES, WHICH ARE ALSO FURTHER ADDRESSED IN OUR PROPOSAL FOR YOUR CONSIDERATION, INCLUDE:

October 28, 2024
Attn: Joanna Moreno
City of Vernon | 4305 Santa Fe Ave, Vernon, CA 90058 | (323) 583-8811 RE: PROFESSIONAL ENGINEERING DESIGN PROPOSAL FOR CITY OF VERNON Source Water Quality Assessment and Design of Treatment Facilities • PACE is designing multiple treatment systems for per- and polyfluoroalkyl substances (PFAS) for Orange County Water District (OCWD). Our recent experience has shown that more and more active groundwater wells will eventually detect PFAS such as perfluorooctanoic acid (PFOA) as they continue to “pull and extract” contaminants at the wellhead.

Therefore, for wells undergoing future manganese and iron removal, PACE recommends the City consider “available space planning” to accommodate future PFAS treatment improvements when PFAS becomes detectable at such wells.

COVER LETTER
• Well No. 20 (1,100 gpm) is located on the furthest east end of the City and is the only well out of the seven active wells that has detected PFOA. However, three of the other wells (No. 15: 1,150 gpm, No. 17: 1,200 gpm, and No. 19: 1,050 gpm) are located less than 1 mile away from Well No. 20 and pump groundwater from the same aquifer. • The PACE team is interpreting the approach described in the RFP as to first perform water quality assessment of all seven active water wells. However, the RFP also shows the City has pre-determined that design of treatment systems at the City’s newest Well No. 22, and at Well No. 20 that has PFOA, will be needed. PACE believes it is also important to obtain other pertinent data, such as the age of the well, historical production performance degradation, historical changes in water quality, and the anticipated useful life of the well casing. For example, if a well does have water quality concerns with manganese, iron, and PFOA, and the metal well casing appears to have additional useful life remaining but has seen a dramatic reduction in water production, that well should have a lower priority ranking from the perspective of return on investment (ROI) from investing in a treatment system at this well site. The City’s Well No. 22, which may also have elevated levels of manganese and iron, being the newest well in operation with a high production flow rate capacity, could have the highest probability of being the City’s highest priority ranking well from the perspective of both useful life and production performance.
• Although the current City scope of work does not include water well production performance evaluation or field testing to evaluate such performance, the PACE team can offer an optional task for up to two well sites through our subconsultant to perform “zone isolation and testing with depth-specific water quality sampling” using a low concentration of an NSF 61 approved tracer, which could also be done without “pulling the pump.” No water will be wasted, and there will be no noise impacts from portable pumps or the need for temporary space to house Baker Tanks.

This method was recently used by BESST on a project in San Diego and was approved by the Division of Drinking Water (DDW). This test will provide valuable insight to the team to determine if contaminants can be isolated through “packers” and if the well is still producing at or near its original design capacity. • Typically, the treatment of manganese and iron consists of pre-oxidization with chlorine, followed by pressure vessel treatment using Greensand as the treatment media. The treatment of PFAS/PFOA is typically achieved with pressure vessels (with pre-filters) filled with ion exchange (IX) media or granular activated carbon (GAC) without any chlorine.

Therefore, dichlorination and a contact time chamber are necessary additional treatment steps in between the above treatment components. Since the design of this system is complex with different undesired constituents, before designing a full-scale system, PACE recommends performing an optional task consisting of a cost-effective, small-scale pilot to meet the City’s needs. The benefits of conducting this optional pilot testing are:
» “De-risk” the Project by validating the proposed treatment process using the selected Greensand and IX media. » Identify the worst-case scenario in backwash frequency and the level of anticipated back-pressure buildup with the Greensand and IX media.
» Optimize the chlorine dosage based on actual anticipated water quality and concentration of iron and manganese. » Optimize the dichlorination (sodium bisulfite) dosage based on the amount of residual chlorine. » Validate the effectiveness of the selected IX media in removing PFAS.

Our anticipated subconsultants for this Project are:
• BESS Testlab – Pipe Locating / Potholing (Optional)
• BESST – Zone Isolation and Testing / Depth Specific Water Quality Sampling (Optional) Topographic Survey Geotechnical Engineering CEQA Compliance C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

COVER LETTER
Duncan Lee, PE | Project Manager
Principal, QA/QC Manager – Utilities Division
D: (714) 481-0662 | m: (714) 553-6967
E: [email protected]
Business Entity Information and office contact nearest to Vernon and where project will be managed:

Identification: C-Corporation
Name: Pacific Advanced Civil Engineering, Inc. (PACE)
17520 Newhope Street, Suite 200, Fountain Valley, CA 92708 | (714) 481-7300 Our QA/QC senior staff member, James Matthews, PE, is highly regarded in the water, wastewater, recycled water, and stormwater treatment industries. As Project Manager for this effort, I offer the City the benefit of a combined 30 years of municipal and public agency experience, including most recently 17 years as the Principal Civil Engineer for the City of Huntington Beach. My technical expertise includes municipal engineering for water, wastewater, and recycled water infrastructure in design and project management roles. Since joining PACE 6 years ago, I have utilized my understanding of the typical municipal process to service municipalities like Vernon. This lets me put myself in your shoes as I direct our consultant team to best meet your needs.

Our proposed engineering services are based on the requested scope of services, with the proposed fees and overall scope divided into the various tasks described in the RFP. I have read, understood, and agreed to all statements in this request for proposal and acknowledged receipt of all addendums/amendments and the terms, conditions, and attachments referenced. Our proposal is valid for at least 90 days from the date of submittal.

We are excited to have the opportunity to demonstrate our capabilities to work with the City to complete this Project, as this is the first step to designing and building a future treatment project that we can all be proud of for years to come.

Sincerely,

INTRODUCTION
INTRODUCTION // 1
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES The Request for Proposal (RFP) from the City of Vernon (City) Public Utilities Department (PUD) is for the Source Water Quality Assessment and Design of Treatment Facilities Project (Project). According to Exhibit C in the RFP, Water System Schematic Diagram, the water system consists of seven active wells, one other (No. 14 as Standby), a 10 million gallon (MG) reservoir, six 1 MG tanks, a 0.6 MG elevated storage tank, three booster pump stations, and one MWD import connection. According to the City’s website, the water system also consists of 49 miles of transmission and distribution mains. Currently, the City believes manganese is the primary concern, as historical water quality data indicated all seven wells have either elevated concentration levels or have exceeded the Secondary Drinking Water Standard limit of 0.05 mg/L. However, there are also elevated levels of iron in at least three wells, and perfluorooctane sulfonate (PFOS) levels are near the federal Maximum Contaminant Level (MCL) at one well (No. 20).

PACE is familiar with the City’s water system infrastructure and current water quality concerns as we helped evaluate and design the City’s newest and largest producing well, Well No. 22, located on 50th Street. This newest City water well sits on a very small and narrow footprint. According to the January 7, 2020, Final Well Design Memorandum by Richard C. Slade & Associates, the well has six different aquifer zones. 4 of the six zones exceed the iron Secondary Limit of 0.3 mg/L, and 3 of the six zones exceed the manganese Secondary Limit of 0.05 mg/L. The City should anticipate construction costs alone for the treatment system at each well to range from $4M to $5M.
 Well No. 20 (1,100 gpm) is located on the furthest easterly end of the City limit and is the only well out of the total of seven active wells that currently detected PFOA. However, three of the other wells (No. 15 – 1,150 gpm, No. 17 – 1,200 gpm, and No. 19 – 1,050 gpm) are located only less than 1 mile away from Well No. 20, which pumps groundwater from the same aquifer.  The PACE team is interpreting the approach described in the RFP which is first perform water quality of all seven active water wells.

However, the RFP showed the City has pre-determined to require the design of the treatment system at the City’s newest Water Well No. 22, and at Water Well No. 20 that has PFOA. PACE believes it is also important to obtain other pertinent data, such as the age of the well, historical production performance degradation, historical changes in water quality, and the anticipated useful life of the well casing. For example, if a well does have water quality concerns with manganese, iron, and PFOA, and the metal well casing appears to have additional useful life remaining but has seen a dramatic reduction in water production, it should have a low priority ranking from the perspective of return on investment (ROI) from investing in a treatment system at this well site. On the contrary, the City’s Well No. 22, which may also have elevated levels of manganese and iron, being the newest well in operation with a high production flow rate capacity, could have the highest probability of being the City’s highest priority ranking well from the perspective of both useful life and production performance.

Preliminary Site
Observations

PROJECT UNDERSTANDING
The PACE team reviewed the RFP, lessons learned from past and other current projects, knowledge learned when PACE designed the City’s most recent Well No. 22 (~2,100 gpm design pump capacity), and developed a list of preliminary observations that are noteworthy for consideration:
 PACE is designing multiple treatment systems for per- and polyfluoroalkyl substances (PFOS) for the Orange County Water District (OCWD) using ion exchange (IX) media.

Our recent experience has shown that more and more active groundwater wells will eventually detect PFAS such as perfluorooctanoic acid (PFOA) as they continue to “pull and extract” water at the wellhead. Therefore, for wells undergoing future manganese and iron removal, PACE recommends the City consider “available space planning” to accommodate future PFAS treatment improvements when PFAS becomes detectable at such wells.

INTRODUCTION // 2
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES  The treatment media to remove manganese and iron will differ from those required to remove PFAS/PFOA, thereby requiring a larger footprint to house different treatment trains. For example, although PACE did allocate the southern portion of the Well No. 22 (2,100 gpm) site for future pressure vessels to treat manganese and iron, the existing space is likely insufficient to also treat PFAS/PFOA if that were to occur in the future. On the other hand. The Well No. 20 is significantly larger than that of Well No. 22, with half the well pumping capacity. Therefore, that site should have sufficient available space to house all the proposed treatment improvements. PACE prepared a concept layout for both sites (see Appendix 1). Our intention is not to present these concepts as the only design solutions for consideration but instead as a platform to develop and refine concepts that best meet the City’s objectives.  Typically, the treatment of manganese and iron consists of pre-oxidization with Chlorine, followed by pressure vessel treatment using Greensand as the treatment media. The treatment of PFAS/PFOA is typically achieved with pressure vessels (with pre-filters) filled with ion exchange (IX) media or granular activated carbon (GAC) without any Chlorine. Therefore, dichlorination and a contact time chamber are necessary additional treatment steps in between the above treatment components. Since the design of this system is complex with different undesired constituents, before designing a full-scale system, PACE recommends performing an optional task consisting of a cost-effective, small-scale pilot to meet the City’s needs. The results and benefits from this optional pilot testing task are:
» “De-risk” the Project by validating the proposed treatment process using the selected Greensand and IX media. » Identify the worst-case scenario in backwash frequency and the level of anticipated back-pressure build-up with the Greensand and IX media. » Optimize the Chlorine dosage based on actual anticipated water quality and concentration of iron and manganese. » Optimize the dichlorination (Sodium Bisulfite) dosage based on the amount of residual Chlorine » Validate the effectiveness of the selected IX media in removing PFAS.  PFAS/PFOA treatment is heavily leaning toward using IX instead of GAC, with this trend established by OCWD through their independent past pilot study. One of the main reasons is the Empty Bed Contact Time (EBCT) requirement, which favors IX. The EBCT for IX is 3 minutes, while the EBCT for GAC is 10 minutes, more than three times as long. The larger the EBCT, the larger the pressure vessel and the greater the volume of treatment media, which drives up costs.  Based on our experience from similar pressure vessel treatment projects on existing water well sites, claiming CEQA Exemption will suffice for environmental compliance. Therefore, an Initial Study is not typically necessary.

PROJECT APPROACH
Involve City O&M staff early and often in developing the Final Bid Documents.

The PACE team will utilize experience in the design, operation, and maintenance of water treatment and water wells to assist the City in determining an optimal well site treatment approach and the design evaluation strategy for the Project. PACE will meet with the City’s engineering team and the operations and maintenance (O&M) staff to understand and solidify the project objectives. PACE will study the existing conditions and compare newly acquired water quality data, available historical well performance and water quality data, as-built drawings, past rehabilitation efforts, overall system operation philosophy, available land for offsite treatment, etc., to better understand current challenges and to develop a viable and practical recommendation for the City’s consideration.

STRATEGY 01
PACE will provide a cohesive team of engineers and subconsultants with extensive experience to tackle APU’s project objectives.

PACE will meet challenges head-on by working with APU’s project manager to collaborate with others for this fast-track well assessment and rehabilitation project.

INTRODUCTION // 3
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Perform the PACE-recommended optional task for the pilot test and study to validate the proposed treatment method and media.

PACE design objectives include “de-risking” the Project for the City. This treatment system is complex, and the treatment methods should be tested and validated before investing the fullscale capital costs into the Project. The portable PACE pilot skid has five “see-through” column pipes to house treatment media or other purposes. Each column can be set up to operate in parallel, in series, multi-series, etc. Precipitates accumulated on the surface of the Greensand filter media will be visible. There are both upstream and downstream sample ports for each column to allow maximum flexibility to identify testing points. PACE is proposing a 2-week pilot testing period for a site and up to 2 sites. Column #1 will house Greensand media. Column #2 will function as a dechlorination chamber and pre-filtering. Column #3 will house IX media.

Columns #4 and #5 will house Greensand media, but will have different flow (flux) rates. The pilot system will be able to inject Chlorine to oxidize iron and manganese and separately inject Sodium Bisulfite to dechlorinate before the effluent is allowed to enter the IX media column.

STRATEGY 02
Analyze the well production impact from the “build-up”
of backwater pressure from the treatment media and
precipitates.

Pressure treatment vessels filled with media and pre-filter devices will create backwater pressure, reducing the normal pumping capacity the City is accustomed to. Furthermore, using Greensand to remove iron and manganese will routinely fluctuate in additional backwater pressure between when the vessels are cleaned from backwashing cycles and when the vessels are considered “semi-clogging” from the buildup of precipitates. PACE will need the pump curves and historical flow and pressure SCADA data of all active water wells to analyze such potential production impact and can offer operation suggestions accordingly. It is important to note the greater flow rate (flux) into the treatment system, the quicker it will want to clog and increase the backwater pressure, which will determine the frequency when the Greensand vessels will need backwashing.

STRATEGY 03
Backwash Greensand filter vessels will be relatively frequent and should of be automated to reduce impacts to water
operators.

The Greensand treatment media will require routine backwashing. From PACE’s experience with past clients, operators want an automated system with electrically actuated valves as much as possible, thereby minimizing the impact on their hectic responsibilities to maintain a water system. Since PACE can perform programming the control process and construct the control panel for automation, the City may later elect to hire PACE to perform these functions, which are typically done through the contractor, to reduce delay from this relatively long lead-time item for additional compensation.

Perform an optional access survey to confirm that the mini video camera assessment, along with PACE’s other proposed optional tests and sampling, can be performed without “pulling the pump.”
Since water wells typically will have at least a 2-inch diameter camera port, PACE’s subconsultant, as an optional task, can run a mini video camera to obtain valuable condition assessment information to help with deciding whether or not to invest capital improvement funds for a new treatment system for that specific well.

STRATEGY 04
STRATEGY 05
INTRODUCTION // 4
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Perform the PACE-recommended optional task to obtain
current well performance and detail depth-specific water quality data.

PACE’s recommended optional task for “zone isolation and testing” is done through a zone testing method using a low concentration of an NSF 61 approved tracer, which could also be done without “pulling the pump.” An additional benefit is that no water will be wasted, and there will be no noise impacts from portable pumps or the need for temporary space to house Baker Tanks. At the same time, the PACE team, through the subconsultant can efficiently obtain valuable water samples to perform depth-specific water quality sampling. This method was recently used by BESST on a project in San Diego and was approved by the Division of Drinking Water (DDW). BESST would also perform this test. Since the number and type of tests have yet to be determined as an optional task, our confidential fee proposal will not have a fee estimate for this optional line item for laboratory testing. We can obtain a rate schedule from a laboratory that can perform such tests if requested by the City.

Being able to determine if the existing well can continue to produce water extraction at an acceptable level for a significant amount of time in the future and knowing the corresponding water quality to gauge what type of future treatment, if any, is necessary to utilize the well is the first decision step. If this optional well performance and depth-specific water quality assessment deem the well not viable anymore, the City can then reallocate available resources toward the other wells instead.

STRATEGY 06
Identify early on if existing well sites do not have sufficient open space for the new treatment system or if the City is open to a master plan approach consisting of a “centralized treatment system.”
If and when an existing well site does not have sufficient open space to house the new treatment system, it is a common practice to identify a nearby open space that can function as a “centralized treatment system (CTS).” Although the City’s current plan per the RFP is to treat two wells, water quality conditions can change, such that more wells may need treatment to meet demands. PACE is aware of multiple large Southern California water purveyors who have taken a CTS scalable design approach with properly sized collection headers to allow the seamless addition of treatment trains in the future.

For example, PACE created a separate future concept (see Appendix 1) to address a potential scenario where Well No. 22 detects PFOA. Around December 2020, PACE completed the design of a new 12-inch diameter Ductile Iron distribution line that replaced and abandoned the existing 10-inch diameter Cast Iron pipe from Well No. 22, which terminated easterly, nearly to S. Soto Street. While the recently abandoned pipe had to be replaced for being undersized to serve as a distribution pipe, it is adequately sized, and approximately 1,400 feet could be re-purposed / reactivated to function as a lower-pressure “well collection line” with approximately 2,350 feet of new well collection pipe toward the Well No. 15 and No. 19 well site that appears to have ample open space owned by the City. This same site also houses three 1-MG water storage tanks and a booster pump station. As mentioned previously, our intention is not to present this separate future concept as the only design solution for consideration but instead as a platform to develop and refine concepts that best meet the City’s objectives.

STRATEGY 07
Long lead time with pressure vessel vendors can negatively impact construction schedules and bids.

Pressure vessel manufacturers have been hectic meeting demand due to the influx of PFAS/ PFOA treatment projects. OCWD has been “pre-purchasing” vessels so that contractors building the improvements will not be impacted by this long lead time for this essential item. Allowing the design process to move in parallel with the pre-purchasing of vessels significantly reduces the overall construction schedule per well site, allowing water purveyors to reduce the risk of having their vital water wells shut down due to exceedance of the federal MCL. With Phase 3 of the RFP being Construction Management (CM), removing the added waiting period from this long lead time item during construction can also more likely reduce the overall construction duration, thereby reducing the cost to the City of having the CM on the Project.

STRATEGY 08
INTRODUCTION // 5
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Use 3D modeling to visualize the completed installation and quickly identify potential construction and operational conflicts.

Pressure vessel treatment systems, especially when involving lead-lag vessels like those for PFAS/PFOA treatment, will have pipes crossing over and under one another, making it difficult to plan-check and QA/QC. Therefore, this initial design will be developed as a 3D model, allowing the City and PACE team to visualize the completed installation and quickly identify potential construction and operational conflicts. PACE will then generate traditional drawings for bid. Progress drawing sets will be submitted to the City based on 70%, 90%, and 100% submittal milestones, and the team will meet to review comments from staff at each milestone before delivering 100% final plans and specifications.

STRATEGY 09
Perform QA/QC for PACE projects, which is essential.

Collaboration among peers within the PACE organization, coupled with interaction with City staff and our subconsultants, will reduce the likelihood of design oversights while delivering a more thought-out project for the City. The QA/QC process to the PACE team is a “mindset” to continually deliver quality work and protect the City and PACE, not merely a required occasional task to fulfill a task order. Below is our exhibit showing the PACE’s Project Management and QA/QC approach.

STRATEGY 10
Project Management / QA/QC
The Project Manager coordinates all planning and design work with all subconsultants and staff. Regular meetings or teleconferences will be held with applicable Project Team members and consultants to coordinate engineering study and/or design issues. Meeting minutes will be kept and retained in project files.

In addition to the progress reports, an Action Items Matrix (AIM) will be prepared, updated monthly, and provided to APU. The AIM will identify actions to be accomplished, description of the activity, date for completion and lead person/party responsible for ensuring the action is completed.

SUBCONSULTANT MANAGEMENT
Agreements with our subconsultants will be followed by detailed task orders delineating the budget, schedule, and scope. These task orders will be monitored for progress and compliance. We will track the resources and the costs against the planned targets to ensure the resources are efficiently employed. Our working history with subconsultants and the skill of our subconsultant team provide the basis for a well-managed project delivery.

BUDGET CONTROL
Engineering costs will be controlled by frequent monitoring and early identification of any scope/design change affecting project costs. Construction cost estimates will be developed based on the preliminary design effort and using current costs for • Progress To-Date • List of Issues Which May Affect Project Schedule / Objectives
• Schedule Status
• Work Planned for Upcoming Month

CLIENT COORDINATION
The Project Manager will be the project’s primary source contact with the client on contracting matters. A Project Manager will be assigned to each project and will directly interface with the client as a primary contact.

All correspondence to the client, whether incoming or outgoing, will be through the Project Manager. The Project Manager will keep the client informed of the project progress on a monthly basis unless otherwise indicated in the work plan or contract work scope. The monthly progress reports will, at a minimum include:

INTRODUCTION // 6
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES construction materials and techniques based on our recent/current experience and costing indexes. The estimate will then be compared to the client’s budget expectations and if a gap is present, discussions will take place to determine if value engineering or other actions are necessary. Invoicing will follow client’s guidelines established at the start of each project. All invoices are reviewed by the Project Manager for accuracy and compliance prior to submittal to client.

WORK LOCATION
All PACE project management efforts will be coordinated out of our headquarter office in Fountain Valley, CA. Regular coordination meetings can occur at client’s offices, or using one of the many meeting and coordination resources we have available such as Teams or Zoom (video conferencing), which allow us to minimize budget for travel and meetings. However, pending public safety guidance, in-person meetings will be encouraged at critical project durations (kick-off, conclusion of conceptual design, final design submittals, public outreach / agency coordination meetings, etc.).

PROJECT SCHEDULING
PACE will use the MS Project scheduling system to continuously monitor project costs, labor, and progress. We will develop a conceptual milestone schedule based upon anticipated needs of the project and major task items. With each monthly progress report, PACE will submit an updated 4-week horizon schedule reflecting planned work. PACE will promptly notify the client of any changes in anticipated project progress and will submit an update detailed project schedule to the client.

QUALITY CONTROL PROGRAM
Our team will provide the highest quality work products. This will be accomplished through implementation of a Quality Assurance/Quality Control program that will be clearly defined in a quality control plan developed specifically for this project.

Quality management will be used to ensure that the deliverables for the project meet a formally established standard of acceptance. Reviews are provided at critical points and specific responsibilities for the different levels of reviews during the life of the project are pre-defined.

NOTHING is released from the project team to the client without at least one review.

Quality control for the project will utilize tools and methodologies for ensuring that all deliverables comply with approved quality standards.

1. Senior level staff and technical
area experts will assist the
Project Manager in verifying the
quality standards are met for the
deliverables.

2. Use of a Technical Advisory
Panel made up of senior
technical experts to review
recommendations developed by
the project team. These experts
will attend the criteria committee
meetings, constructability review
meetings and workshops, as
needed.

3. Regularly scheduled project
coordination meetings between
the client and our Project Manager
and project engineers.

4. Independent review of each
technical work product before its
submission to the client.

5. Bi-monthly performance
assessments from the client.

PEER REVIEW

PE REVIEW

INDEPENDENT

MILESTONE REVIEW

PROJECT

MANAGEMENT CHECK
Responsibility: PM
Frequency: As Scheduled
Responsibility: QC Manager
Frequency: As Scheduled
Responsibility: PE
Frequency: Weekly
Responsibility: Subtask
Leader/Task Manager
Frequency: Daily,Weekly
Responsibility: Designer/Peer
Frequency: Daily/More Often
• Validity of Data
• Design Standard/Criteria Check
• Calculation Checks
• Logic Checks
• Drafting Check/Back Checks
• Validity of Data
• Design Standard/Criteria Check
• Scope/Risks
• Peer Review Coordination
• Constructibility
• Design Standard/Criteria Check
• Scope/Risks
• Calculation Checks
• Overall Compatibility/Coordination
• Potential Errors
• Constructibility Cost
• Design Standard/Criteria Check
• Scope/Risks
• Compatibility/Coordination
• Potential Errors
• Constructibility
• Constructibility Cost
• Overall Compatibility/Coordination
• Design Standard/Criteria Check
• Scope/Risks
• Constructibility
• Monitor Designer/Peer Review

SUBMITTAL

SUBTASK LEADER/

TASK MANAGER REVIEW

QUALITY AUDITS / QA LEADER
{
{
{
{
{

GENERAL SCOPE

OF WORK
We understand the City desires to contract a consultant with expertise in potable water wells to ensure a successful Project. The City envisions the selected consultant performing the required efforts through a three-phase Project, starting with well water quality assessment, then designing up to two treatment facility systems to remove/reduce manganese, with the possibility to also remove/reduce iron and PFOS. The City is open to a creative approach to meet the Project objectives, which may or may not include “blending” to meet water quality parameters.

Although the design effort in Phase II will be focused on the two wells selected by the City, the goal of the Phase I assessment is to recommend treatment options for all of the active wells. Therefore, as part of Phase I, PACE proposes to develop a “master plan” level concept approach for the treatment systems at each of the seven wells, which will be included in the Assessment Report. This approach will streamline future treatment designs for the remaining wells, providing better value to the City.

PHASE I
Well water quality assessment with
treatment option recommendations for
all seven wells.

PHASE II
Well treatment design for Well No.
22 and No. 20 (preparing plans,
specifications, and cost estimates).

PHASE III
Project and Construction Management
(including preparing record as-built
drawings).

SCOPE OF WORK
GENERAL SCOPE OF WORK // 7
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

WORK PLAN
WORK PLAN // 8
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES PACE developed and organized the following primary tasks and subtasks to fulfill the requirements outlined in the RFP. Based on the PACE team’s experience, we propose some optional subtasks to help “de-risk” the proposed improvements and further justify our recommendations. Supplemental assumptions and exclusions follow.

1.1 1.2

1.3 1.4

1.5 1.6

1.7 1.8

1.9 2.1

2.2 2.3

2.4 2.5

2.6 2.7

2.8 2.9

2.10 2.11

3.1 3.2

3.3 3.4

3.5 3.6
Review Record Drawings, Water Quality
Data, and Relevant Information
Obtain Baseline Water Quality Test Data
Identify Treatment Options and Concept
Treatment Layout, Including Blending
with Corresponding Impacts to the
Existing Water System
Pilot Testing (Optional but Highly
Recommended) (Assumed for Two
Sites)
Well Survey Video to Inspect Casings
(Optional) (Assumed for Two Sites) *
Zone Isolation and Testing Using
the Tracer Dye Method with Report
(Optional) (Assumed for Two Sites) *
Depth-Specific Water Quality Sampling
Blending with Report (Optional)
(Assumed for Two Sites) *
Draft Assessment and Proposed
Treatment Options Report (Technical
Memorandum)
Final Assessment and Proposed
Treatment Options Report (Technical
Memorandum)
* If the City has relatively recent data and
information, PACE can review such data and
remove these three optional subtasks.

Assist the City with Internal City Permits
(i.e., Building, Fire, etc.)
Topographic Survey and Prepare
Basemap
Pipe Locating and Potholing (Optional)
(Assumed 2 Days Total)
Soil Borings and Geotechnical Report
(One 50’ Deep Boring at Well 20 and
One 30’ Deep Boring at Well 22)
Assist the City with Obtaining DDW
Approval
Prepare 70% Submittal (Plans)
Prepare 90% Submittal (Plans,
Specifications, and Estimate)
Prepare 100% Submittal (Plans,
Specifications, and Estimate)
Prepare Signed PS&E Package for Bid
Prepare 90% Pre-Purchase Pressure
Vessels Package (Optional)
Prepare Final Pre-Purchase Pressure
Vessels Package (Optional)
Project Management and Meetings
During Design
Assist the City with the CEQA
Exemption Process
Bid Phase and Construction Engineering
Support, Including Mandatory Pre-Bid
Construction Meetings (T&E) (RFIs,
Submittals, CORs, Coordination, etc.)
Construction Management and
Meetings (T&E) (Assumed 2 Hours per
Day for 18 Months)
Oversight of Operational Startup Testing
(T&E) (Assumed up to 4 Full Days)
Prepare Record Drawings from
Contractor’s Redline Plan Set
Phase I – Assessment Phase II – Design (OnSite Treatment System at Well No. 20 and Well
No. 22)
Phase III – Project
and Construction
Management

TASK TASK TASK
01 02 03

DETAILED WORK PLAN
WORK PLAN // 9
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES PACE’s proposal is based on the following assumptions and exclusions:
 Well No. 20 is believed to be in a “liquefaction zone,” which is why the geotechnical soil boring will be deeper at 50 feet, while the boring for Well No. 22 will be at 30 feet.
 PACE has the original geotechnical report for designing Well No. 22. If the team deems the report is adequate and can be utilized for the design of the upcoming treatment system at Well No. 22, PACE can reduce the fee proposal accordingly by eliminating the cost to perform a soil boring.
 For Subtask 1.2, the City will provide operation staff to pump-to-waste each well pump sequentially to allow PACE to efficiently collect water samples and to minimize the number of days for site visits.
 The optional Subtask 1.4, Pilot Testing, will require 3 weeks per site for a total of 6 weeks for two sites. PACE will need the City to provide a port from the discharge header before chlorine injection to connect raw well water to PACE’s pilot skid. The discharge water from the pilot skid will be disposed of through the on-site pump-to-waste drain.
 For optional Subtasks 1.5 to 1.7 to perform video inspection, zone isolation and testing, and depth-specific water quality sampling, the City will collaborate with PACE’s subconsultant to sequentially perform such tasks at both sites to minimize the number of days for site visits.
 For optional Subtask 2.3 Pipe Locating and Potholing, the City will collaborate with PACE’s subconsultant to sequentially perform such tasks at both sites to minimize the number of days for site visits.
 For Subtask 2.2, PACE has a “pre-construction” topographic survey for the design of Well No. 22. PACE believes it is highly probable the treatment system can be designed with a much reduced topographic survey. If the City and PACE agree on an approach that can reduce the cost of a topographic survey, the fee can be reduced accordingly.
 For Subtask 3.2, the PACE team, from experience, believes the most likely approach for CEQA compliance will be to prepare an “Exemption Justification Memo” for each site, in addition to filling and posting the typical one-page Notice of Exemption.

The fee proposal includes the cost of preparing these memos, but it can be significantly reduced if the City can attain CEQA compliance without them.
 PACE has included an exhibit showing a potential concept needing off-site improvements for well collection piping. That concept is not meant to be part of the scope of work required per the RFP, but rather to demonstrate PACE’s understanding and creativity to assist the City with this Project.
 The RFP requires construction management services (Subtask

3.4), but does not mention inspection or material testing. PACE assumes the construction duration will be up to 18 months and assumes an average of 2 hours per day to manage the project during the construction phase. Fees can be reduced accordingly if the construction duration is less than 18 months.

On the other hand, if the construction duration is beyond 18 months, PACE will seek a fee increase to account for the additional effort.
 PACE assumes the well sites have adequate surplus electrical power supply, with spare circuit breakers or space for new ones in the existing MCC/main distribution panels to meet the operational needs for the new treatment system. If the City’s existing well sites does not have adequate power supply or electrical equipment to meet the needs of the new treatment system, PACE will promptly provide the City with a request for additional funds for this additional task.

WORK PLAN // 10
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ID Task Name Duration
1 Notice to Proceed 1 day
2 Kick off Meeting 1 day
3 Subtask 1.1 - Review Record Drawings, Water Quality Data, and Relevant Information 3 wks 4 Subtask 1.2 - Obtain Baseline Water Quality Test Data 2 days 5 Subtask 1.3 - Identify Treatment Options and Concept Treatment Layout, Including Blending with Corresponding Impacts to the Existing Water System 3 wks
6 Meeting with the City to Discuss Preliminary Concepts 1 day 7 Subtask 1.8 - Draft Assessment and Proposed Treatment Options Report (Tech Memo) Submittal
3 wks
8 City Review and Comment 2 wks
9 Subtask 1.9 - Final Assessment and Proposed Treatment Options Report (Tech Memo) Submittal
2 wks
10 City Approval 1 wk
11 Subtask 2.2 - Topographic Survey 2 wks
12 Subtask 2.4 - Soil Borings and Geotechnical Report 3 wks 13 Subtask 2.6 - 70% Plans Submittal 14 wks
14 City Review and Comment 2 wks
15 Subtask 2.7 - 90% PS&E Submittal 10 wks
16 City Review and Comment 2 wks
17 Subtask 2.1 - Apply and Submit City Permits 10 wks
18 Subtask 2.5 - Apply and Submit DDW Permit 10 wks
19 Subtask 2.8 - 100% PS&E Submittal 5 wks
20 City Review and Comment 2 wks
21 Subtask 2.9 - Signed PS&E Package for Bid 1 wk
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Year 2
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
City of Vernon
Request for Proposals
Source Water Quality Assessment and Design of Treatment Facilities Proposed Schedule
(Does not include optional tasks)
PACE JN C361
Project: City of Vernon Source Water Quality
Assessment and Design of Treatment Facilities
Date: Tue 10/15/24

PROPOSED PROJECT SCHEDULE

ABILITY OF THE

PROPOSER TO

PERFORM
ABILITY OF THE PROPOSER TO PERFORM // 11
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

TEAM MEMBER FIRM DESCRIPTIONS
Pacific Advanced Civil Engineering,
Inc. (PACE) is a specialized civil
engineering firm headquartered in Fountain
Valley, CA, dedicated to providing advanced
water engineering solutions. We offer a
wide range of engineering services related
to water, wastewater, and stormwater
management and water resource
permitting and regulatory compliance
to ensure projects are both economically
viable and environmentally sustainable.

Our engineering approach focuses on
maximizing value by creating multi-use
infrastructure systems, cost-effective
phasing strategies, and systems that include
environmental, aesthetic, and recreational
uses. PACE staff members include licensed
professional engineers with PhDs, university
instructors, and policymakers in the water
resources arena.

Our clients benefit from our experience with advanced water operations consulting, laboratory testing, pilot testing, and treatment facility design. PACE has successfully completed a variety of wellhead treatment and water quality improvement projects, including colored water treatment, corrosion and scaling control, taste and odor control, hydrogen sulfide removal, and removal of trace contaminants such as iron, manganese, arsenic, uranium, and fluoride. Our background has led us to emphasize compatibility, constructability, costs, and long-term ease of operations for treatment systems and operational improvements.

About PACE
With more than 35 years of experience, PACE is highly qualified in many areas of water infrastructure and water quality engineering. Our potable water expertise includes, but is not limited to, the following:
 Field evaluations, including on-site water quality monitoring, process improvement, systems troubleshooting, and general operational assistance  Field and in-house water analysis and bench- and pilot-scale testing capabilities  Source water and finished water quality management and improvement  Surface and groundwater treatment system design, construction, and operation  Water distribution (pipeline and pump station) design and operation  Advanced knowledge of challenging water chemistry, microbiology, and hydraulics
 Disinfection byproducts control and contaminant removal  Color, taste, and odor control
Firm Type Environmental /
Civil Engineering
100
Employees (approx.) Firm
Incorporated Year 1987 /
State of California
Office Locations
17250 Newhope Street, Suite 200 – Fountain Valley, CA 92078 8723 E. Via de Commercio, #A-204 –Scottsdale, AZ 85258
Engineering Services
Water / Wastewater Stormwater Permitting
ABILITY OF THE PROPOSER TO PERFORM // 12
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES PACE offers the following unique qualifications and benefits to the City:

Track-Record with the City
of Vernon Delivering Projects
Successfully
On the Well 22 project, the City of
Vernon accepted PACE’s change order
recommendation to replace nearly 2,000
feet of 10-inch cast iron pipe with a 12-inch
ductile iron pipe, which was completed
within a tight design schedule phased for two
separate construction contracts. Overall, PACE
has a successful track record of delivering
projects with accelerated schedules, including
entire wastewater treatment plants in under
24 months from design to startup.

Lessons Learned
Lessons learned from 10+ recent wellhead
treatment projects ensures well-functioning
components, setup, and valve controls.

Familiarity with City Standards
and Provisions
PACE has recently worked on City projects,
understands the design standards and the
processing requirements within different
City departments. We will apply this fresh
understanding to ensure efficient and
successful project delivery.

Constructability and Operability
Background Ensures Buildable
and Low-Cost Reliable
Operation
PACE has an extensive background in
design-bid-build, design-build, CMAR, and
operations that provide a unique insight into
project designs to improve constructability
and minimize construction cost.

Accurate Construction Cost
Estimating Operation
PACE has a positive track record working
closely with municipal engineering
and operations staff to carefully select
improvements that would be simple to
construct and meet budget constraints while
satisfying operations requirements. PACE cost
estimates are frequently within 5% of the
average of the low two bids.

Wear “the City’s Hat” with
Project Manager that is Former
Principal Civil Engineer with
Local City
Duncan Lee, PE, the team’s Project Manager,
will impart his in-depth understanding
of municipal facilities and challenges to
seamlessly integrate the PACE team to serve
as an extension of City staff.

Proven Approach to Guarantee
Cost and Performance of Key
Equipment
Performance based specifications for vessels,
valves, and controls (for components not
already pre-established) improves project
schedule, cost, and quality.

Operated Iron and Manganese
Wellhead Systems
PACE has over a decade of experience
operating wellhead treatment systems,
including oxidant dosing control, backwash,
media replacement, and expansions.
01 06
07 08
02 03
04 05
Key Qualifications
ABILITY OF THE PROPOSER TO PERFORM // 13
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Huitt-Zollars, Inc., a corporation, is a full-service engineering and surveying firm with 20 offices throughout the U.S. Founded in October 1975, Huitt-Zollars has a staff of 482 professionals, technical and support personnel with diversified skills, capable of handling highly complex multi-discipline assignments. Huitt-Zollars is consistently ranked as a top design firm by Engineering News-Record and Architectural Record.

Since their founding in 1965, Terracon, a Corporation, has grown into a thriving, employeeowned, multidiscipline engineering consulting firm delivering facilities, environmental, geotechnical, and materials services. Their more than 7,000 employees include engineers, scientists, architects, facilities experts, and field professionals focused on solving engineering and technical challenges from more than 180 locations nationwide.

Bess is a certified MBE & UNION Underground Utility Service Company established in 1967 as a privately owned C-Corporation. BESS utilizes State-of-the-Art Electromagnetic and Acoustic Pipe Locators as well as Ground Penetrating Radar (GPR), Vacuum excavation (potholing) equipment, CCTV pipe inspection robotic crawlers, and survey equipment to designate and map all underground utilities.

Best Environmental Subsurface Sampling Technologies (BESST, Inc.) has evolved and greatly diversified from subsurface sampling and monitoring products into various service areas, including installation of multilevel monitoring wells, drilling oversight, well design for test and production wells, lithium exploration, performing dynamic flow and chemistry surveys in wells and test boreholes, video surveys, etc.

EPD Solutions, Inc. (EPD) is a full-service environmental consulting corporation dedicated to providing environmental and planning services of distinction, quality, and legal merit.

EPD team’s thorough understanding of the myriad federal, State, and local regulations that may apply to specific project undertakings enables EPD to avoid costly delays in project implementation.

Subconsultants
Optional Subconsultants
ABILITY OF THE PROPOSER TO PERFORM // 14
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

ORGANIZATION CHART

TEAM MEMBER RESUME TABLE

TOPOGRAPHIC
SURVEY
Michael Kremer, PLS 1
David Mackey, PLS 1
CEQA

COMPLIANCE
Konnie Dobreva 3
Alex Garber 3

PIPE LOCATING /
POTHOLING OPTIONAL
Donald Whitman 4

ZONE ISOLATION AND

TESTING / DEPTH SPECIFIC

WATER QUALITY
SAMPLING OPTIONAL
Noah Heller, MS, PG 5
SR. STRUCTURAL

ENGINEER
Santosh Shahi,
PhD, SE, PE

PILOT TESTING
Shanka Henkanatte
Gedara, PhD
SR. PROJECT

ENGINEER
Jacob Peterson, PE

PROJECT MANAGER
Duncan Lee, PE
QA/QC
James Matthews, PE

1. Huitt-Zollars

2. Terracon

3. EPD

4. BESS Testlab (Optional)

5. BESST (Optional)
subconsultants

GEOTECHNICAL

ENGINEERING
Joshua Morgan, PE 2
Fred Buhamdan, PE 2
Carlos Amante, PE, GE 2
Name, Title, Role, and
Involvement % Experience in Similar Work Efforts
PACE

DUNCAN LEE, PE
Vice President, Utilities Division –
Project Manager
20%
• City of Vernon Water Well 22 Water Line Improvements and Treatment System – Vernon, CA • City of Riverside Garner B Well PFOA/PFOS Treatment Pilot Testing – Riverside, CA • OCWD PFAS Well Treatment – Orange County, CA
• City of Huntington Beach Well 9 GAC Treatment System – Huntington Beach, CA • City of Seal Beach Lampson Wellhead Treatment and Sewer Siphon – Seal Beach, CA • Sweetwater Authority Iron and Manganese Well Treatment System – National City, CA • City of Huntington Beach Replacement of Well 1 with Well 1A – Huntington Beach, CA • City of Huntington Beach New Well 12 – Huntington Beach, CA

JAMES MATTHEWS, PE
Vice President, Environmental
Water Division – QA/QC
15%
• Groundwater Iron and Manganese Filtration System – South Orange County, CA • Grizzly Ranch Potable Water System – Portola, CA
• Water Treatment Facility for Iron and Manganese Removal – Lakeside, CA • Golden State Water Imperial Plant PFAS Treatment Facility – Imperial, CA • City of Huntington Beach Well 9 Wellhead Treatment System – Huntington Beach, CA • Dateland Groundwater Treatment Systems and Automation – Dateland, AZ • City of Santa Monica Sustainable Water Infrastructure Project (SWIP) Advanced Water Recycling Facility – Santa Monica, CA
ABILITY OF THE PROPOSER TO PERFORM // 15
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Name, Title, Role, and
Involvement % Experience in Similar Work Efforts

JACOB PETERSON, PE
Sr. Project Manager – Sr. Project
Engineer
25%
• City of Riverside Garner B Well PFOA/PFOS Treatment Pilot Testing – Riverside, CA • OCWD PFAS Well Treatment – Orange County, CA
• Groundwater Iron and Manganese Filtration System – South Orange County, CA • Water Treatment Facility for Iron and Manganese Removal – Lakeside, CA • Sweetwater Authority Iron and Manganese Well Treatment System – National City, CA • City of Seal Beach Lampson Well Treatment and Sewer Siphon – Seal Beach, CA • City of Santa Monica Sustainable Water Infrastructure Project (SWIP) Advanced Water Recycling Facility – Santa Monica, CA

SHANKA HENKANATTE

GEDARA, PHD
Water Quality Specialist – Pilot
Testing
25%
• Huntington Beach Well 9 Sulfide Removal Treatment System – Huntington Beach, CA • Golden State Water Company Del Monte Well 4 Arsenic Reduction – San Dimas, CA • Huntington Beach Well 6 Sulfide Odor Removal Evaluation – Huntington Beach, CA • NEREO LFHR Reverse Osmosis Treatment System Performance and Treatment Efficiency Evaluation – Fountain Valley, CA
• Novel Photo-Biological Technology for Reverse Osmosis Brine Treatment – Alamogordo, NM

SANTOSH SHAHI, PHD, SE,
PE
Sr. Structural Engineer – Sr.

Structural Engineer
25%
• Los Angeles Valley College, Media Arts and Performing Arts Building - Los Angeles, CA • Santa Monica College, Student Services Building - Santa Monica, CA • Campbell Hall School, Community Arts Center - Santa Monica, CA • UCLA South Campus Student Center - Westwood, CA
• Los Angeles International Airport, Air Freight Building No. 1 - Los Angeles, CA • MGM Plaza Risk Analysis - Santa Monica, CA
• 1111 Wilshire Project - Los Angeles, CA

HUITT-ZOLLARS

MICHAEL KREMER, PLS
Sr. Project Manager – Project
Manager
30%
• On-Call Survey and Mapping – Simi Valley, CA
• Santa Ana the Village Lot 8, 9, and 10 Staking – Oxnard, CA • On-Call Surveying Services – Santa Ana, CA
• Canyon Booster Pump Expansion – Santa Paula, CA
• Hollywood Reservoir Water Quality Improvement Project – Los Angeles, CA • Wishing Tree Park – Torrance, CA
• Omnitrans On-Call Architectural And Engineering Services (MNT20-02) – San Bernardino, CA

DAVID MACKEY, PLS
Land Surveyor – Sr. Project
Surveyor
35%
• Wishing Tree Neighborhood Park - Los Angeles County, CA • On-Call Surveying Services, Planning Area 2 - Rancho Mission Viejo, CA • Topographic Surveys - Long Beach, CA
• On-Call Surveying Services - Santa Ana, CA
• On-Call Architectural and Engineering Services (MNT20-02) - San Bernardino, CA • Pacific Electric Bike Trail - Upland, CA

TERRACON

JOSHUA MORGAN, PE
Regional Geotechnical Services
Manager – Authorized Project
Reviewer (APR)
25%
• Aoura Hills Stormwater Treatment Facility - Agoura Hills, CA • Transfer Station Water Quality Improvement Project - Culver City • John Anson Ford Park Infiltration Project - Bell Gardens, CA • Garvey Avenue Grade Separation Drainage - El Monte, CA • Mesmer Low Flow Diversion - Culver City, CA
• City-wide Storm Drain Point Repair Project - Rancho Palos Verdes • 28th Street Storm Drain Infiltration Project - Manhattan Beach, CA • Culver City Diversion Sewer Project – Culver City, CA • Subsurface Infiltration Trench Feasibility Study - Manhattan Beach, CA • California Rehabilitation Cente0, - Norco, CA
• Manhattan Beach Subsurface Infiltration Trench Feasibility Study - Manhattan Beach, CA ABILITY OF THE PROPOSER TO PERFORM // 16
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Name, Title, Role, and
tInvolvement % Experience in Similar Work Efforts

FRED BUHAMDAN, PE
Regional Manager/Vice President
– Authorized Project Reviewer
(APR)
20%
• Agoura Hills Stormwater Treatment Facility - Agoura Hills, CA • Utility Maintenance Facility - Huntington Beach, CA
• Rousselle Street Flood Protection Project - Santa Ana, CA • CWE Santa Ana Green Street Urban Greening - Santa Ana, CA • CWE Santa Ana Bristol- Tolliver Urban Greening - Santa Ana, CA • Garvey Avenue Grade Separation Drainage - El Monte, CA • Transfer Station Water Quality Improvement Project - Culver City, CA • John Anson Ford Park Infiltration Project - Bell Gardens, CA • Garvey Avenue Grade Separation Drainage - El Monte, CA

CARLOS AMANTE, PE, GE
Sr. Project Manager –
Geotechnical Project Manager
40%
• City of Vernon Well No. 22 Structures and Site Improvements - Vernon, CA • City of Laguna Beach Bluebird SOCWA Lift Station Odor Control Improvements - Laguna Beach, CA • Orange County Water District (OCWD) Groundwater Replenishment System Final Expansion Project - Fountain Valley and Huntington Beach, CA
• Elsinore Valley Municipal Water District (EVMWD) Diamond Regional Sewer Lift Station - Lake Elsinore, CA
• City of West Covina Cameron Avenue Sewer Main Rehabilitation Project - West Covina, CA EPD

KONNIE DOBREVA
Vice President of Environmental
Planning – CEQA Project Manager
30%
• Well 28 IS/MND – Orange, CA
• Simon Ranch Reserovir MND – Tustin, CA
• Covina Recreation Village CEQA/NEPA Analysis – Covina, CA • 747 N Barranca Residential Project CEQA Analysis – Covina, CA • Griswold Residential Project – Los Angeles County, CA • Storage COA Amendment CEQA Exemption – Signal Hill, CA • Related Bristol Specific Plan EIR – Santa Ana, CA

ALEX GARBER
Sr. Technical Planner – Air Quality
and GHG Specialist
35%
• Simon Ranch Reservoir MND – Tustin, CA
• Irvine Valley College Student Housing Air Quality and GHG Analysis – South Orange County Community College District, CA
• 5770 Industrial Parkway Air Quality, Energy, GHG Report and Health Risk Assessment – San Bernardino, CA
• Trade and Commerce Air Quality, Energy, GHG, and Health Risk Assessment Reports – Palmdale, CA • CSG Solar Projects Traffic Analysis and Air Quality and GHG Report – Kings County, CA

BESS TESTLAB (OPTIONAL)

DONALD WHITMAN
Project Manager – Project
Manager
30%
• LA County Department of Public Works On Call Potholing Services Contract – Los Angeles, CA • Coachella Valley District Irrigation Lateral 119.64-7.5 Improvement Project – Coachella Valley, CA

BESST (OPTIONAL)

NOAH HELLER, MS, PG
President – Principal
Hydrogeologist
Project Manager
25%
• USGS Tracer Flowmeter and Depth Dependent Sampler – Various Cities, CA • Well Modifications – Various Cities, CA
• Long Screened Test Wells – Various Cities, CA
• Production Well Design and Installation Well 19R - Upland, CA • Production Well Design and Installation Wells F-21C and F-10E - Fontana, CA City of Vernon Water Well 22 Treatment System Vernon, CA Sweetwater Authority Iron and Manganese Well Treatment System National City, CA Relevant Features
Relevant Features
6 Wellhead equipping design2,100 gpm
potable water well
6 Site layout, electrical supply, and
piping designed to accommodate
future wellhead treatment
6 Designed to City of Vernon standards
6 1,400 gpm Greensand media filtration
treatment system
6 Pilot testing to guide filtration system
selection, demonstrating 89% removal
of iron and manganese
6 On-site water quality analyzers
6 Drinking water permitting and
approval assistance
Team Member:

Duncan Lee, PE Project Manager
Team Member:

Andy Komor, MS, PE Project Manager
Duncan Lee, PE QA/QC
Jacob Peterson, PE Sr. Project Engineer
Shanka Henkatte Gedara, PhD, PE
Pilot Testing and Water Quality Analysis
Engineer
PACE prepared plans and specifications for the City of Vernon so their newly drilled water well could provide up to 2,100 gallons per minute (gpm) of potable well water into their existing distribution system. The pump is driven by a 400-horsepower motor, and the wellhead is covered with a removable enclosure to protect the equipment. In addition, the City’s material and specification preferences were incorporated to assist with standardizing equipment throughout the City. The site layout is very small and narrow, so the design satisfied Low Impact Development (LID) requirements by limiting the newly impervious area to less than 5,000 feet. Piping and valves were designed so that the site could accommodate steel treatment tanks for future wellhead treatment.

The Sweetwater Authority in southern San Diego County sought to remove color from the drinking water within the National City area, which was caused by iron and manganese in three major supply wells. PACE completed a 3-month pilot project using five different treatment trains for oxidative filtration of iron and manganese. The train consisting of “Greensand Plus,” or manganese dioxide-coated sand, achieved treatment consistently to less than 5 parts per billion. By removing iron particles about 0.45 micrometers in size, accumulation in the drinking water system in National City will be substantially reduced.

The system includes backwash recovery to save water loss from backwash. The full-scale design integrates the proposed final treatment system into the existing site with a new booster pump skid and on-site water quality analyzers. PACE also provided drinking water permitting and approval assistance.

ABILITY OF THE PROPOSER TO PERFORM // 17
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

RELEVANT PROJECT EXPERIENCE
City of Huntington Beach Well 9 GAC Treatment System Huntington Beach, CA City of Seal Beach Lampson Wellhead Treatment and Sewer Siphon Seal Beach, CA Relevant Features
Relevant Features
6 4.3 MGD (3,000 gpm) groundwater
treatment
6 GAC filtration system
6 Water quality analysis
6 Treatment system piloting
6 Instrumentation and controls
6 4,000 gpm biological treatment system
6 Wellhead treatment system added to
an existing groundwater well
6 Treatment pilot study to determine
the feasibility of a biological treatment
process using GAC
6 Four 12-foot steel pressure vessels
6 Invert siphon for backwash discharge
to the existing sewer system
Team Member:

Andy Komor, MS, PE Project Manager
Duncan Lee, PE (as client) Principal
Manager for City of Huntington Beach
James Matthews. PE Sr. Consulting
Engineer
Shanka Henkatte Gedara, PhD, PE
Water Quality Expert
Team Member:

Duncan Lee, PE Project Manager
Andy Komor, MS, PE Principal / QA/QC
Jacob Peterson, PE Sr. Project Engineer
Shanka Henkatte Gedara, PhD, PE
Pilot Testing and Water Quality Analysis
Engineer
PACE provided multiple phases of project development, laboratory services, piloting, concept development, water treatment facility engineering, planning division graphics, and startup and operations support services on this innovative and unique treatment system.

Sophisticated desktop, bench-scale, pilot-scale, and full-scale demonstrations were provided for confirmation of the proposed biological treatment of reduced (non-oxidized) drinking water quality constituents in the potable supply at Well 9 and other City wells. This first stage of work confirmed mechanisms for biological oxidation of hydrogen sulfide. This important and unique process has been presented at several national conferences, including the American Water Works Association (AWWA). Design of the complete 3,000 gpm (4.3 MGD) treatment facility included a granular activated carbon (GAC) filtration system and media, with complete structural, mechanical, electrical, and controls integration for reliable and simple operation. A custom filtration control panel design was also constructed and programmed.

PACE provided all project bid documents, permitting, and coordination with Southern California Edison and assisted the City with the bid process and construction support services.

The Lampson Water Well produces up to 4,000 gpm and is one of the City of Seal Beach’s four water wells. Historically high hydrogen sulfide (H2S) concentration levels have caused the well to be underutilized, operating at low flow rates to avoid odor complaints. The City contracted PACE to evaluate treatment alternatives to efficiently reduce H2S concentration levels. On-site pilot testing was employed to evaluate the viability of a biological treatment process using granular activated carbon (GAC) with and without plastic media and under various operating conditions. The pilot testing allowed for troubleshooting and refinement that led to selection of the biological activated carbon (BAC) process. The final system design effectively removes H2S odors and reduces chlorine chemical dosage using four 12-foot diameter steel pressure vessels, and also allows for future incorporation of PFAS treatment. Additionally, since the filter vessels need periodic backwashing and the wastewater can be discharged to the existing sewer system, PACE designed an inverted sewer siphon to increase flow capacity through an existing choke point. Approximately 100 feet of 6-inch pipeline was designed and located along an adjacent roadway.

ABILITY OF THE PROPOSER TO PERFORM // 18
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Groundwater Iron and Manganese Filtration System South Orange County, CA Relevant Features
6 PS&Es of 1,000 gpm iron and
manganese filtration system
6 Four parallel manganese dioxide filter banks
6 Treatment bypass to blend low iron
content well water with treated water to
increase capacity
6 Instrumentation and controls
6 Pre-filtration to increase filter
performance
Team Member:

Jacob Peterson, PE Project Manager
James Matthews, PE Principal / QA/QC
PACE designed, constructed, and commissioned a new 1,000 gpm iron and manganese filtration system for a booster pump station in south Orange County. The system was designed to improve reliability and operational flexibility by allowing the client to supply irrigation water needs from any of their groundwater wells, including wells with elevated levels of these contaminants. The treatment system consists of automatic inlet pressure regulation, chlorine pre-oxidation injection, four parallel manganese dioxide filter banks, and a semi-automated treatment bypass that allows blending of low iron content well water with treated water. This increases the capacity of the booster pump station to 1,500 gpm and provides source water equivalent to the capacity. When commissioned, the system was performance-tested at its maximum design flow rate with influent total iron concentrations as high as 15 milligrams per liter (mg/L) and consistently produced effluent with less than 0.2 mg/L.

Orange County Water District PFAS Well Treatment Orange County, CA Relevant Features
6 400 to 3,500 gpm PFAS well treatment
systems
6 Comparison of alternative concepts
6 Pre-treatment filtration to improve
performance
6 Coordination with the Water District
and multiple cities
Team Member:

Duncan Lee, PE Project Manager
Jacob Peterson, PE Sr. Project Engineer
Orange County Water District (OCWD) hired PACE to provide well treatment design for six water well sites, consisting of up to eight wells, for the Golden State Water Company. Three sites are within the City of Stanton, two sites are within the City of Garden Grove, and one site is within the City of Placentia. The pressure vessel treatment systems will treat flows between 400 and 3,500 gpm. OCWD previously completed a pilot study and determined that the treatment process will consist of pre-treatment using bag filters, followed by ion exchange media in steel pressure vessels. Based on the design well capacity at each site, the treatment system will be sized and designed to meet the treatment objective consistent with OCWD’s pilot study recommendations, while providing alternative concept plans for stakeholders to review. PACE will also prepare feasibility studies for two separate private pump-to-waste drain lines to connect to the existing public storm drain system.

ABILITY OF THE PROPOSER TO PERFORM // 19
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Lili Hernandez
Principal Civil Engineer
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
[email protected]
(714) 374-5386
Iris Lee
Public Works Director/City Engineer
City of Seal Beach
211 Eighth Street
Seal Beach, CA 90740
[email protected]
(562) 431-2527
Fernando Romero
Senior Water Engineer
City of Riverside – Public Utilities
3750 University Avenue, 3rd Floor
Riverside, CA 92522
[email protected]
(951) 826-5443

ADDITIONAL GROUNDWATER /

FILTRATION

TREATMENT EXPERIENCE

SUMMARY
GroundwaterIron/Manganese/PFASIon ExchangeGAC FiltrationReverse OsmosisDistribution SystemField AnalysisLab AnalysisBench/Pilot TestingOperationsInstrumentation & Controls City of Huntington Beach Well 9 – Huntington Beach, CA         City of Huntington Beach Wells 3, 6, and 8 – Huntington Beach, CA      City of Riverside Garner B Treatment Plant Condition Assessment and PFOS-PFOA Pilot System – Riverside, CA      
City of Seal Beach Lampson Water Well and Sewer Siphon – Seal Beach, CA         City of Somerton Potable Water Master Plan – Somerton, AZ      City of Vernon Water Well 22 Treatment System – Vernon, CA    Desert Color Groundwater Quality – St. George, UT      Golden State Water Company Del Monte Well Arsenic Removal – Claremont, CA    Golden State Water Imperial Plant PFAS-PFOA Treatment Facility – Imperial, CA     Grizzly Ranch Potable Water System – Portola, CA   
Los Angeles Country Club Groundwater Treatment System – Los Angeles        Mesa Water District Well Automation & Ozone Treatment – Costa Mesa, CA     National City Well Iron and Manganese Treatment System – National City, CA       Orange County Water District PFAS Well Treatment – Orange County, CA    San Diego County Ion Exchange for a Series of Potable Water Wells – San Diego County, CA      Santa Ana Country Club RO System – Orange County, CA       Santa Margarita Water District Nichols Research Institute Corrosion Prevention Chemical Injection System – Santa Margarita CA    
South Carolina Superfund Site Groundwater Remediation – Simpsonville, SC     Sweetwater Authority Iron and Manganese Well Treatment System – National City, CA   Town of Dateland Groundwater Treatment Plant Upgrade – Dateland, AZ      Wellhead Iron & Manganese Treatment – South Orange County, CA       ABILITY OF THE PROPOSER TO PERFORM // 20
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

REFERENCES

APPENDICES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES APPENDIX 1

APPROACH

CONCEPTS
WORK PLAN // 11
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES CTS CONCEPT FOR WELL 22
For example, PACE created a separate future concept to
address a potential scenario where Well No. 22 detects PFOA.

Around December 2020, PACE completed the design of a new 12-inch diameter Ductile Iron distribution line that replaced and abandoned the existing 10-inch diameter Cast Iron pipe from Well No. 22, which terminated easterly, nearly to S.

Soto Street. While the recently abandoned pipe had to be replaced for being undersized to serve as a distribution pipe, it is adequately sized, and approximately 1,400 feet could be re-purposed / reactivated to function as a “well collection line” with approximately 2,350 of new well collection pipe toward the Well No. 15 and No. 19 well site that appears to have ample open space owned by the City. This same site also houses three 1-MG water storage tanks and a booster pump station.

APPENDICES – APPROACH CONCEPTS // 12
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

93.7'

92.6'

22.6'

80.7'
130.2'

16.1' 55.4'

DISTRICT BLVD
SCALE
1" = 20'
DATE
0 REV
Issued

DESCRIPTION ENGR
JM 8/29/24 JM 8/29/24

DATE APPD DATE
09/27/23
DRAWN

DESIGNED

APPROVED
MA
MA
JM
WELL 20 SITE LAYOUT
4755 DISTRICT BLVD.

VERNON PUBLIC UTILITIES

WATER DIVISION
SHEET 1 OF 1
N
Ø10.00'

2.0' 3.0' 3.0' 29.1' 3.0'

12.3' 2.0' 3.0'

20.0'

3.5'

15.0'

2.0'

5.0'
Ø10.00'
Ø10.00'
Ø6.00'

5.2'
17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
10 5 0 10 20
A. IRON AND MANGANESE TREATMENT SYSTEM
CONCRETE PAD DIMENSIONS: 20"x15"
B. CHEMICAL STORAGE TANK
C. BUFFER TANK
D. PFAS TREATMENT SYSTEM WITH PRE-FILTERS
CONCRETE PAD DIMENSIONS: 40.1"x17.3"
CONCEPT: (1100 GPM)

EXAMPLE OF AN IRON AND MANGANESE TREATMENT SYSTEM
A
B C
D
WELL#20 SITE PLAN
APPENDICES – APPROACH CONCEPTS // 13
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

4.0'

15.0'

5.0'

42.0'

5.0'

3.5'
17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
6 3 0 6 12
A. IRON AND MANGANESE TREATMENT SYSTEM
CONCRETE PAD DIMENSIONS: 42"x15"
CONCEPT: (2100 GPM)
A
WELL#22 SITE PLAN
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES APPENDIX 2

RESUMES
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
BS Civil Engineering
California State University, Long Beach – 1985

YEARS OF EXPERIENCE
35 Years
Joined PACE in 2018
With others over 30 years

REGISTRATIONS
Professional Engineer / CA 1989 / 44825
project
manager
Duncan
Lee, PE
With a combined 30 years of municipal/public agency experience, including most recently 17 years as a Principal Civil Engineer for the City of Huntington Beach and nearly 10 years of experience with the Los Angeles Department of Water and Power (LADWP) with drinking water and recycled water, Duncan Lee offers technical expertise on the engineering of municipal water infrastructure in both the design role and the City project management role. He has managed all aspects of water, sewer, and recycled water systems from capital improvement design and project implementation, master planning, rate studies, rate increases, water conservation, and construction management. The majority of the projects that he managed/ designed were performed for coastal Cities throughout California. He will impart several strategies to overcome key potential project issues and his value is most felt in his proven ability to unite engineering, operation, maintenance, and consultants in a productive and collaborative environment. His recent project experience includes project management, water and sewer master planning, asset management planning, cost estimating, and design of water and sewer improvement projects including wastewater collection systems, sewer pump stations, potable water pumping facilities, force main improvements, sewer diversions, water storage facilities, and potable water treatment facilities. He has extensive experience managing multidisciplinary teams and managing large-scale programs with numerous simultaneous efforts. Duncan adds significant value to a wide range of utility projects serving as the Project Manager and will impart current experience with granular activated carbon (GAC) wellhead treatment systems in Southern California.

RELATED EXPERIENCE
City of Vernon Water Well 22 Water Line Improvements and Treatment System – Vernon, CA
Mr. Lee served as the Project Manager to prepare prepared plans and specifications for the City of Vernon so the newly drilled water well could provide up to 2,100 gpm of potable well water into their existing distribution system. The pump is driven by a 400-horsepower motor, and the wellhead is covered with a removable enclosure to protect the equipment.

The site layout is very small and narrow, so the design minimized space used for nonessential wellhead components while leaving room to accommodate steel treatment tanks for wellhead treatment. PACE also suspected that 2,000 linear feet of the existing cast iron distribution piping, to which the new 12-inch discharge pipe would connect, had tuberculation and would create excess pressure buildup if the new well operated at full capacity. PACE implemented a physical flow test and validated that the existing pipe lost over half of its capacity. As a result, the existing 10-inch cast iron pipe was replaced with a new 12-inch ductile iron pipe.

Sweetwater Authority Iron and Manganese Well Treatment System – National City, CA
The Sweetwater Authority in southern San Diego County sought to remove color from the APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES drinking water within the National City area, which was caused by iron and manganese in three major supply wells. Mr. Lee served as the QA/QC for the completion of a 3-month pilot project using five different treatment trains for oxidative filtration of iron and manganese.

The train consisting of “Greensand Plus,” or manganese dioxide-coated sand, achieved treatment consistently to less than 5 parts per billion. By removing iron particles about

0.45 micrometers in size, accumulation in the drinking water system in National City will be substantially reduced. The system includes backwash recovery to save water loss from backwash. The full-scale design integrates the proposed final treatment system into the existing site with a new booster pump skid and on-site water quality analyzers. PACE also provided drinking water permitting and approval assistance.

City of Huntington Beach Well 9 GAC Treatment System – Huntington Beach, CA Mr. Lee served as the City Principal Engineer managing the analysis and design of a complete 3,000 gpm (4.3 MGD) GAC filtration system treatment facility. The project included multiple phases of project development, laboratory services, piloting, concept development, water treatment facility engineering, planning division graphics, and startup and operations support services. Sophisticated desktop, bench-scale, pilot-scale, and fullscale demonstrations were provided for confirmation of the proposed biological treatment of reduced (non-oxidized) drinking water quality constituents in the potable supply at Well 9 and other City wells.

City of Seal Beach Lampson Wellhead Treatment and Sewer Siphon – Seal Beach, CA
The Lampson Water Well produces up to 4,000 gpm and is one of the City of Seal Beach’s four water wells. Historically high hydrogen sulfide (H2S) concentration levels have caused the well to be underutilized, operating at low flow rates to avoid odor complaints. As the Project Manager, Mr. Lee led the design of a biological activated carbon (BAC) process to remove H2S odors and reduce chlorine chemical dosage using four 12-foot diameter steel pressure vessels, and also allows for future incorporation of PFAS treatment. Additionally, since the filter vessels need periodic backwashing and the wastewater can be discharged to the existing sewer system, PACE designed an inverted sewer siphon to increase flow capacity through an existing choke point. Approximately 100 feet of 6-inch pipeline was designed and located along an adjacent roadway.

OCWD PFAS Well Treatment – Orange County, CA
Mr. Lee is serving as the Project Manager for the well treatment design for six water well sites, consisting of up to eight wells, for the Golden State Water Company. Three sites are within the City of Stanton, two sites are within the City of Garden Grove, and one site is within the City of Placentia. The pressure vessel treatment system will treat flows between 400 and 3,500 gallons per minute. OCWD previously completed a pilot study and determined that the treatment process will consist of pre-treatment using bag filters, followed by ion exchange (IX) media in steel pressure vessels. Based on the design well capacity at each site, the treatment system will be sized and designed to meet the treatment objective consistent with OCWD’s pilot study recommendations, while providing alternative concept plans for stakeholders to review. PACE will also prepare feasibility studies for two separate private pump-to-waste drain lines to connect to the existing public storm drain system.

City of Riverside Garner B Well PFOA/PFOS Treatment Pilot Testing – Riverside, CA Mr. Lee served as Project Manager to lead a condition assessment of the out-of-service GAC treatment system to determine the feasibility of rehabilitating the system into a full-scale pilot system to treat PFOA/PFOS. The pilot study evaluated potential treatment alternatives PROJECT MANAGER – Duncan Lee, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES and enhancements, including co-precipitation filtration and biological treatment, that could lower capital costs and/or annual operations and maintenance costs compared to typical treatment methods. Upon determining that the rehabilitation was feasible, PACE prepared improvement plans and specifications to reactivate the treatment system, designed modifications to accommodate either granular activated carbon (GAC) or ion exchange media, and specified components to be replaced, including the flow meter and tank lining.

City of Huntington Beach Replacement of Well 1 with Well 1A – Huntington Beach, CA
Led by Mr. Lee while he was employed by the City of Huntington Beach, this water well replacement project was critical to increasing overall reliability of the City’s aging well infrastructure. The project site was a small lot, located in a quiet residential neighborhood adjacent to homes. In order to obtain public support and the necessary permit from the City’s Planning Department, the new structure and landscaping were designed to appear similar to the nearby homes to be aesthetically unobtrusive. All equipment was placed indoors to protect it from public view and to comply with the City’s noise ordinance. The well room was designed with removable walls and roof to allow for major well maintenance and rehabilitation activities. The well can produce up to 2,500 gpm with a 250-horsepower motor, with the option to operate with a variable frequency drive at fixed or variable speed.

In the event of a catastrophic loss in both electrical power and natural gas supply to the site, a 500-gallon liquid propane gas tank provides backup energy to operate a natural gas engine generator. Wellhead treatment consists of chlorine and fluoride addition. Chlorine is stored in an isolated ventilated room in a 1-ton double-walled containment vessel and a separate 150-pound double-walled containment vessel. A separate chemical room designed with a floor containment system can store chemicals such as fluoride.

City of Huntington Beach New Well 12 – Huntington Beach, CA Led by Mr. Lee while employed by the City of Huntington Beach, this new water well sits on a commercially zoned property obtained through a development agreement with The Boeing Company. The well room was designed with removable walls and roof to allow for major well maintenance and rehabilitation activities. The electrically driven well equipment can produce up to 3,000 gpm with a 300 horsepower motor, with options to operate with a variable frequency drive at fixed or variable speed. At the time this well was designed, there was adequate redundant overall well pumping capacity, so no backup equipment was included at this site. Chlorine is stored in an isolated ventilated room, a 1-ton double-walled containment vessel, and a separate 150-pound double-walled containment vessel. Wellhead treatment consists of chlorine and fluoride addition. A separate chemical room designed with a floor containment system can store chemicals like fluoride.

PROJECT MANAGER – Duncan Lee, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
BS Civil Engineering San Diego State University
– 1994

YEARS OF EXPERIENCE
32 Years
Joined PACE in 1994

REGISTRATIONS
Professional Engineer / CA 57446
Professional Engineer / AZ 34090
Professional Engineer / CO 0054243
Professional Engineer / FL 69722
Professional Engineer / HI 13718
Professional Engineer / ID 11229
Professional Engineer / NM 16491
Professional Engineer / TX 132370
Professional Engineer / UT 11893246 2202
Professional Engineer / VA 040716
Wastewater Treatment Operator / AZ WW023812
Professional Engineer / National NCEES 18-931-54

AFFILIATIONS
American Water Works Association (AWWA)
Water Environment Federation (WEF)

PUBLICATIONS
EPA’s Small Flows Quarterly: “Hybrid Sequencing
Batch Reactors”
Santa Margarita Water District: “Advanced
Processes for Water Reuse”
PEARL Education Program: Electrical Power and
Control Systems
James
Matthews,
PE
James Matthews is highly regarded in the water, wastewater, recycled water, and stormwater industries for his tremendous wealth of practical knowledge and his ability to use old and new technologies, hands-on experience, and research to produce value for his clients and their projects. Mr. Matthews has created designs for a multitude of award-winning projects; saving capital and operation costs, reducing construction schedules, and minimizing operation and maintenance needs on water and wastewater treatment facilities, reservoirs, and pump stations by implementing creative ideas and concepts. As both a licensed engineer and operator, Mr. Matthews is a technical expert in infrastructure and treatment engineering design, construction, and operations. He has particular experience in leading design and design-build teams by providing “cradle to grave” services on all aspects of complex water resource projects. He has been directly involved in over 250 water projects in the U.S., Canada, and Central America.

His expertise is not limited to just water resources, having a wealth of knowledge in electrical, controls, and instrumentation. He has personally fabricated, programmed, and installed a multitude of custom control systems, which included PLC/PAC programming, radio telemetry, and Supervisory Control and Data Acquisition (SCADA) systems for numerous water, wastewater, and cogeneration projects.

RELATED EXPERIENCE
City of Huntington Beach Well 9 Wellhead Treatment System – Huntington Beach, CA
Mr. Matthews served as the Sr. Consulting Engineer and provided QA/QC oversight for testing, alternatives analysis, and design services of a complete 3,000 gpm (4.3 MGD) treatment facility, including six 10-foot diameter biological active carbon (BAC) filtration vessels and media, with complete structural, mechanical, electrical, and controls integration for reliable and simple operation. Mr. Matthews provided key technical direction on the alternatives evaluated and process selection and also led the design, construction, and programming of a custom instrumentation and controls system for the project.

Water Treatment Facility for Iron and Manganese Removal – Lakeside, CA Under the direction of Mr. Matthews as the Principal Engineer, PACE developed a water treatment facility that treats 99% of the client’s water supply to meet U.S. Environmental Protection Agency (EPA) primary and secondary drinking water standards for iron, manganese, arsenic, and uranium. The 500 gpm iron and manganese filtration system uses a proprietary filtration media that completely removes iron and manganese from the potable water supply without the use of complicated chemical injection systems. Later improvements to the filtration plant addressed new EPA compliance requirements for uranium removal using a uranium-specific ion exchange system that treats production water to an average of 5 micrograms per liter (µg/L) with a maximum concentration of 20 µg/L, well below the EPA’s maximum contaminant level (MCL) of 30 µg/L. With a small footprint system in mind, PACE’s design was able to reduce capital and operational costs significantly. Mr. Matthews and the principal /
qa/qc
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES PACE team continue to provide testing and operating supervisory oversight services to ensure optimal operation of the treatment facility.

Groundwater Iron and Manganese Filtration System – South Orange County, CA Mr. Matthews served as the Principal for a new 1,000 gpm iron and manganese filtration system for a booster pump station. The system was designed to improve reliability and operational flexibility, allowing the client to supply irrigation water needs from any of their groundwater wells, including wells with elevated levels of these contaminants. The treatment system consists of automatic inlet pressure regulation, chlorine pre-oxidation injection, four parallel manganese dioxide filter banks, and a semi-automated treatment bypass that allows the blending of low iron content well water with treated water. This increases the capacity of the booster pump station to 1,500 gpm and provides source water equivalent to the capacity. When commissioned, the system was performance-tested at its maximum design flow rate with influent total iron concentrations as high as 15 milligrams per liter (mg/L) and consistently produced effluent with less than 0.2 mg/L.

Town of Kearny Water System Improvements – Kearny, AZ
Mr. Matthews is serving as the Principal / QA/QC for design improvements to the Town of Kearny Water Treatment Facility. The Town of Kearny has been experiencing repeated operational failures with its potable water filtration system, which consists of a pressured media filtration vessel designed to remove manganese and has a design capacity of 700 gpm. The facility suffers from hydraulic surges and equipment and valve failures that have made the system inoperable for the majority of the time since its implementation.

Mr. Matthews helped evaluate the system and identify deficiencies to plan for facility improvements. Improvements will include upgrades to the filtration vessel, process piping, installation of a new pressure control valve, and installation of a new control panel.

Grizzly Ranch Potable Water System – Portola, CA
Mr. Matthews was the Principal Engineer responsible for the design of the potable water infrastructure and wastewater treatment components of the 380-lot Grizzly Ranch development in Portola, California. The design included a 0.5 MGD wellhead treatment system to remove arsenic, iron, sulfide, manganese, and suspended solids from the groundwater supply. Other water infrastructure consisted of a 0.65-million-gallon welded steel potable / fire water storage tank sited on a hillside with four water supply wells, pressure-reducing valve (PRV) stations, three booster pump stations with variable frequency drive (VFD) pumps, programmable logic controllers (PLCs), and an emergency diesel generator. Mr. Matthews also designed the site-wide Supervisory Control and Data Acquisition (SCADA) system with radio I/O for control of the well, booster pump station, and storage tank level controls. Four pressure zones were modeled in WaterCAD for the planning portion of the project.

Golden State Water Imperial Plant PFAS Treatment Facility – Imperial, CA The Golden State Water Imperial Plant treatment facility was completed as a design-build project with PACE serving as the Engineer of Record under the Metro Builders & Engineers Group. The project encompassed the demolition of existing air stripping towers and construction of a new granular activated carbon (GAC) filter system to remove per- and polyfluoroalkyl substances (PFAS) such as perfluorooctanoic acid (PFOA) from the groundwater produced by two on-site water wells. A pre-engineered packaged GAC system from Aqueous Vets was utilized, and Mr. Matthews served as the Project Manager to prepare demolition plans, grading and site detail plans, concrete foundation plans and details, mechanical interconnection piping plans and details, and mechanical design and plans for a pre-treatment basket strainer system and provided construction and commissioning assistance.

RELATED EXPERIENCE CONT.

PRINCIPAL / QA/QC – James Matthews, PE
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
BS Civil Engineering
California Polytechnic University, San Luis Obispo

YEARS OF EXPERIENCE
20 Years
Joined PACE in 2004

REGISTRATIONS
Professional Engineer / CA 2011 / 79146
Former Certified Water Efficiency Professional
2017 / 128195

PRESENTATIONS & PUBLICATIONS
Peterson, J.D., Murphy, R.R., Jin, Y., Wang, L.,
Nessl, M.B., Ikehata, K. (2011) Health effects
associated with wastewater treatment, reuse,
and disposal. Water Environment Research 83:10,
1853-1875.

Jacob
Peterson,
PE
Jacob Peterson has civil and environmental engineering experience spanning back to 2004. He has performed engineering design and support in several areas including water treatment, pump stations, water conveyance and distribution, and surveying services. Mr. Peterson is adept at providing comprehensive civil and mechanical designs that are inventive, cost-effective, and practical and is experienced in construction services on various water resource systems. With his combined knowledge of water resource disciplines, he has been effective in the design, construction oversight, and operational support of numerous projects, including multi-functioning systems incorporating mechanical and biological systems and processes. He offers expertise in a multitude of groundwater treatment processes, including granular activated carbon (GAC) and biological activated carbon (BAC) systems, ion exchange, reverse osmosis (RO), and other types of filtration systems, and has led field pilot testing of several technologies to refine equipping, design, and operations procedures.

RELATED EXPERIENCE
OCWD PFAS Well Treatment – Orange County, CA
Mr. Peterson is serving as the Sr. Project Engineer for the well treatment design for six water well sites, consisting of up to eight wells, for the Golden State Water Company. Three sites are within the City of Stanton, two sites are within the City of Garden Grove, and one site is within the City of Placentia. The pressure vessel treatment system will treat flows between 400 and 3,500 gallons per minute. OCWD previously completed a pilot study and determined that the treatment process will consist of pre-treatment using bag filters, followed by ion exchange (IX) media in steel pressure vessels. Based on the design well capacity at each site, the treatment system will be sized and designed to meet the treatment objective consistent with OCWD’s pilot study recommendations, while providing alternative concept plans for stakeholders to review. PACE will also prepare feasibility studies for two separate private pump-to-waste drain lines to connect to the existing public storm drain system.

Sweetwater Authority Iron and Manganese Well Treatment System – National City, CA
The Sweetwater Authority in southern San Diego County sought to remove color from the drinking water within the National City area, which was caused by iron and manganese in three major supply wells. Mr. Peterson served as the Sr. Project Engineer for the 3-month pilot project using five different treatment trains for oxidative filtration of iron and manganese. The train consisting of “Greensand Plus,” or manganese dioxide-coated sand, achieved treatment consistently to less than 5 parts per billion. By removing iron particles about 0.45 micrometers in size, accumulation in the drinking water system in National City will be substantially reduced. The system includes backwash recovery to save water loss from backwash. The full-scale design integrates the proposed final treatment system into the existing site with a new booster pump skid and on-site water quality analyzers. PACE also provided drinking water permitting and approval assistance. sr. project
engineer
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES City of Seal Beach Lampson Well Treatment and Sewer Siphon – Seal Beach, CA The Lampson Water Well produces up to 4,000 gpm and is one of the City of Seal Beach’s four water wells. Historically high hydrogen sulfide (H2S) concentration levels have caused the well to be underutilized, operating at low flow rates to avoid odor complaints. Mr. Peterson served as the Sr. Project Engineer for the pilot studies to evaluate the viability of a biological treatment process using granular activated carbon (GAC) with and without plastic media and under various operating conditions. The pilot testing allowed for troubleshooting and refinement that led to selection of the biological activated carbon (BAC) process. The final system design effectively removes H2S odors and reduces chlorine chemical dosage using four 12-foot diameter steel pressure vessels, and also allows for future incorporation of PFAS treatment. Additionally, since the filter vessels need periodic backwashing and the wastewater can be discharged to the existing sewer system, PACE designed an inverted sewer siphon to increase flow capacity through an existing choke point. Approximately 100 feet of 6-inch pipeline was designed and located along an adjacent roadway.

Water Treatment Facility for Iron and Manganese Removal – Lakeside, CA As the Sr. Project Engineer, Mr. Peterson designed a groundwater treatment facility that treats 99% of the client’s water supply to meet U.S. Environmental Protection Agency (EPA) primary and secondary drinking water standards for iron, manganese, arsenic, and uranium.

The 500 gpm iron and manganese filtration system uses a proprietary filtration media that completely removes iron and manganese from the potable water supply without the use of complicated chemical injection systems. Later improvements to the filtration plant addressed new EPA compliance requirements for uranium removal using a uranium-specific ion exchange system that treats production water to an average of 5 micrograms per liter (µg/L) with a maximum concentration of 20 µg/L, well below the EPA’s maximum contaminant level (MCL) of 30 µg/L. With a small footprint system in mind, PACE’s design was able to reduce capital and operational costs significantly. PACE continues to provide testing and operating supervisory oversight services to ensure optimal operation of the treatment facility.

Groundwater Iron and Manganese Filtration System – South Orange County, CA Mr. Peterson served as the Project Manager for the design, construction, and commissioning of a new 1,000 gpm iron and manganese filtration system for a booster pump station. The system was designed to improve reliability and operational flexibility, allowing the client to supply irrigation water needs from any of their groundwater wells, including wells with elevated levels of these contaminants. The treatment system consists of automatic inlet pressure regulation, chlorine pre-oxidation injection, four parallel manganese dioxide filter banks, and a semi-automated treatment bypass that allows the blending of low iron content well water with treated water. This increases the capacity of the booster pump station to 1,500 gpm and provides source water equivalent to the capacity. When commissioned, the system was performance-tested at its maximum design flow rate with influent total iron concentrations as high as 15 milligrams per liter (mg/L) and consistently produced effluent with less than 0.2 mg/L.

City of Riverside Garner B Well PFOA/PFOS Treatment Pilot Testing – Riverside, CA Mr. Peterson served as the Sr. Project Engineer to perform a condition assessment of the outof-service GAC treatment system to determine the feasibility of rehabilitating the system into a full-scale pilot system to treat PFOA/PFOS. The pilot study evaluated potential treatment alternatives and enhancements, including co-precipitation filtration and biological treatment, that could lower capital costs and/or annual operations and maintenance costs compared to typical treatment methods. Upon determining that the rehabilitation was feasible, PACE prepared improvement plans and specifications to reactivate the treatment system, designed SR. PROJECT ENGINEER – Jacob Peterson, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES modifications to accommodate either GAC or ion exchange media, and specified components to be replaced, including the flow meter and tank lining.

City of Santa Monica Sustainable Water Infrastructure Project (SWIP) Advanced Water Recycling Facility – Santa Monica, CA
Mr. Peterson served as the Sr. Project Engineer for the design of the Advanced Water Treatment Facility (AWTF), a key component of the City of Santa Monica’s Sustainable Water Infrastructure Project (SWIP). The AWTF treats a combination of raw wastewater and harvested stormwater, producing 1.0 MGD of purified water for groundwater augmentation.

The facility is one of the first to take in raw wastewater, fully oxidize the stream via biological treatment, and provide the required pathogen reduction to meet California Title 22 regulations for indirect potable reuse with reduction of 12-log virus, 10-log Cryptosporidium, and 10-log Giardia all within one facility. The treatment process consists of a five-barrier stream: membrane bioreactor (MBR), cartridge filtration, reverse osmosis (RO), ultraviolet advanced oxidation process (UVAOP), and chlorine disinfection. The facility is the first to receive pathogen credits through the MBR and cartridge filtration processes by deliberately selecting the equipment and system design to remain within certain operating envelopes.

The RO uses total organic carbon (TOC) as a surrogate parameter to measure pathogen reduction, which allows a higher pathogen reduction value to be claimed than typical conductivity values. UVAOP uses free chlorine as the oxidant to reduce the number of chemicals required on-site, with residual chlorine providing downstream process benefits for chlorine disinfection. The AWTF is situated in a highly urbanized area and will be a completely subterranean facility located underneath the City’s Civic Center parking lot. The first level below ground serves as the mechanical treatment area that houses the process equipment. The second level below ground serves as the process tanks, including MBR tanks, filtrate storage, chlorine contact tank, and purified water clearwell.

Los Angeles Country Club Wells and Ozone Injection – Los Angeles, CA As the Project Engineer, Mr. Peterson assisted in developing the best approach to improving irrigation water quality for the Los Angeles Country Club (LACC), which led to the designbuild of an ozonation water treatment system. Mr. Peterson assisted in the design of the ozonation system, including new piping, instruments, ozone generation skid, injection skid and pump from tank, and liquid oxygen storage and controls.

SR. PROJECT ENGINEER – Jacob Peterson, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
BS Mining and Mineral Engineering University of
Moratuwa, Sri Lanka – 2008
MS Environmental Engineering, New Mexico
State University – 2015
PhD Civil Engineering, New Mexico State
University – 2018

YEARS OF EXPERIENCE
10+ Years
Joined PACE in 2018

AFFILIATIONS
American Water Works Association (AWWA)
Rocky Mountain Water Environment Association
(RMWEA)

PUBLICATIONS
Algal-Based, single step treatment of urban
wastewaters, Bioresource Technology, 2015
Maximizing recovery of energy and nutrients
from urban wastewaters, Energy, 2016
Removal of dissolved organic carbon and
nutrients from urban wastewaters by
Galdieria sulphuraria: laboratory to field scale
demonstration, Algal Research, 2017
Shanka
Henkanatte
Gedara,
PhD, PE
Shanka Henkanatte Gedara is a technical expert in sustainable water/wastewater treatment technologies and specializes in energy and nutrient recovery. Dr.

Henkanatte Gedara has experience in developing bench scale research projects to pilot scale demonstrations collaboratively with city utilities and academic institutions. He has extensive research experience in membrane-based potable water recovery and reverse osmosis (RO) concentrate management research.

His extensive research in algae-based wastewater treatment systems has led to receiving extensive research grants from the National Science Foundation (NSF) and led to the “Energy Efficiency and Pollution Control Award” from US EPA. His role at PACE is to lead research and development (R&D) efforts, lead pilot-, bench scale- and full-scale design testing and to extract and analyze water quality data for various water and wastewater treatment applications.

RELATED EXPERIENCE
National City Well Iron and Manganese Treatment System – National City, CA The Sweetwater Authority in southern San Diego County sought to remove the color from the drinking water within the National City Area which was caused by iron and manganese in three major supply wells. Dr. Henkanatte Gedara served as the Water Quality for the threemonth pilot project that PACE conducted using five different treatment trains for oxidative filtration of iron and manganese. Train 4, consisting of “Greensand Plus” or manganese dioxide coated sand, achieved treatment consistently to less than 5 parts per billion. By removing iron particles about 0.45 uM in size, accumulation in the drinking water system in National City will be substantially reduced. The system will include backwash recovery to save water loss from backwash. The team is currently proceeding with the full-scale design by integrating the proposed final treatment system into the existing site with a new booster pump skid and on-site water quality analyzers. PACE is also providing drinking water permitting and approval assistance.

Huntington Beach Well 9 Sulfide Removal Treatment System – Huntington Beach, CA
Dr. Henkanatte Gedara served as the Water Quality Expert to conduct pilot work at the Well 9 full-scale treatment facility, where the potential applicability of a proposed hybrid setup for biological treatment of reduced (non-oxidized) drinking water quality constituents in full scale was investigated. The pilot test results showed that backwash frequency could be extended to three times the existing backwash frequency to minimize annual operating expenses and provide substantial savings on water waste through backwash water and filterto-waste disposal.

Hydrogen Sulfide Removal at the Lampson Water Well – Seal Beach, CA The Lampson Water Well produces up to 4,000 GPM and is one of the City’s four water wells.

Historical water quality data showed a high range of hydrogen sulfide (H2S) concentration levels. Therefore, the well is under-utilized, operating at low flow rates to avoid odor pilot
testing
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES complaints. Dr. Henkanatte Gedara conducted the pilot testing and served as the Water Quality Analyst Engineer for the design of a biological treatment process (BAC) using Granular Activated Carbon (GAC) to remove H2S odor and reduce chlorine chemical dosage.

Periodically, filter vessels need backwashing, and the wastewater is to be discharged to the existing sewer system. PACE also designed an inverted sewer siphon to increase flow capacity through an existing choke point.

Golden State Water Company Del Monte Well 4 Arsenic Removal – San Dimas, CA PACE provided professional consulting services for the Del Monte Well No. 4 arsenic reduction project in Claremont, CA. The raw water from Well 4 contains varying arsenic content, generally exceeding the state MCL of 10 µg/L, with typical concentrations ranging from 20 to 40 µg/L. Treatment and blending were required to reduce the average arsenic concentration to less than 8 µg/L. Dr. Henkanatte Gedara served as the Water Quality Specialist to propose a plan including six operation scenarios and testing schedules for Well 4 based on the key findings from the site visit at the Del Monte storage tank and booster station plant. The plan also included installation concepts for the tank mixing system, analysis of tank inlet/ outlet, as well as the water quality testing protocols for properly monitoring the system performance, parameters including dissolved oxygen, oxidation-reduction potential, total dissolved solids, pH, color, alkalinity, total arsenic, dissolved arsenic, total iron, dissolved iron, total manganese, dissolved manganese, total chlorine, free chlorine, total volatile compounds, total organic carbon, ammonia, and sulfide.

Santa Monica Sustainable Water Infrastructure Project (SWIP) Advanced Water Treatment Facility – Santa Monica, CA
Dr. Henkanatte Gedara served as the Water Quality Specialist for the design of the Advanced Water Treatment Facility (AWTF), a key component of the City of Santa Monica’s Sustainable Water Infrastructure Project (SWIP). The AWTF treats a combination of raw wastewater and harvested stormwater, producing 1.0 MGD of purified water for groundwater augmentation.

The facility is one of the first to take in raw wastewater, fully oxidize the stream via biological treatment, and provide the pathogen reduction requirements to meet California Title 22 regulations for Indirect Potable Reuse (IPR) of 12 log virus, 10 log cryptosporidium, and 10 log giardia all within one facility. The treatment process consists of a five-barrier stream:
membrane bioreactor (MBR), cartridge filtration, reverse osmosis (RO), ultraviolet advanced oxidation process (UVAOP), and chlorine disinfection. The facility is the first to receive pathogen credits through the MBR and cartridge filtration processes by being deliberate in the selection of the equipment and design of the systems to remain within certain operating envelopes. The RO uses Total Organic Carbon (TOC) as a surrogate parameter to measure pathogen reduction, which allows a higher pathogen reduction value to be claimed than typical conductivity values. UVAOP uses free chlorine as the oxidant to reduce the number of chemicals required on-site, with residual chlorine providing downstream process benefits for chlorine disinfection. The AWTF is situated in a highly urbanized area and will be a completely subterranean facility located underneath the City’s Civic Center parking lot. The first level below ground serves as the mechanical treatment area that houses the process equipment. The second level below ground serves as the process tanks, including MBR tanks, filtrate storage, chlorine contact tank, and purified water clearwell.

PILOT TESTING – Shanka Henkanatte Gedara, PhD, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
BS Civil Engineering, University of the Philippines
– 1989
MS Structural Engineering, University of
California, Irvine – 1994
Ph.D. Structural Engineering
University of California, Irvine / 1999

YEARS OF EXPERIENCE
25 Years

REGISTRATIONS
Structural Engineer / CA
2008 / S5149
Professional Engineer / CA
2001 / C61811
Santosh
Shahi, PHD,
SE, PE
With over 25 years of professional experience after a doctorate degree, Mr. Shahi has a strong background in seismic engineering. Having completed projects in California and elsewhere, he brings a strong analysis, both static and performance-based design, as well as seismic detailing capabilities to the design team. Having analyzed, detailed, and plan-checked a wide variety of equipment and non-structural items, Mr. Shahi provides strong seismic anchorage support for the MEP and other disciplines in their design/plan check effort as well. Mr. Shahi has worked on projects ranging from a few hundred dollars to a billion dollars in construction costs.

He has led design efforts with particular emphasis on healthcare-related projects.

He has also worked on various educational projects involving the Division of State Architects (DSA) and led retrofit analysis efforts involving Senate Bill 1952, peer reviews and non-linear analysis for existing hospital buildings. Mr. Shahi has been responsible for the structural review, design, analysis, and construction of various aviation, municipal, courthouse, and historical projects.

RELATED EXPERIENCE
Crescenta Valley Water District Well No. 2 and Related Facilities – La Crescenta, CA Mr. Shahi served as the Structural Engineer working directly for the contractor to prepare construction drawings for the Operation Building.

Peck Reservoir Pump Station Improvements – Huntington Beach, CA As the Structural Engineer, Mr. Shahi worked directly for the contractor to prepare shop drawings, construction support, and design modification for ease of construction.

City of Manhattan Beach Larsson Street Booster Pump Station and 2nd Street Pump Station Upgrades – Redondo Beach, CA
Mr. Shahi conducted the structural and vibration assessments of the existing vaults. Design is currently being performed for the upgrades/replacements of the two facilities, along with determining the preferred sequence of construction to minimize any impact on the current operations of the facility.

Central Lathrop Specific Plan (CLSP) Potable Water Storage Tank and Booster Pump Station – Lathrop, CA
Mr. Shahi served as the Structural Engineer for the design of a new CLSP 1.6 MG Potable Water Storage Tank including a tank mixing system to minimize tank dead zones and inject chlorine to maintain chlorine residual in the tank. A 6,000 GPM Booster Pump Station was also designed to meet the increased water storage and pumping demand and provide sufficient and reliable flow capacity for distribution to the potable water supply network.

Pico Zone A Recycled Water Pump Station C-1494D & Talega Lift Station Modifications C-1511K – San Clemente, CA
As the Structural Engineer, Mr. Shahi verified the structural capacity of the existing structure to support the proposed design.
sr. structural
engineer
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES City of Manhattan Beach Roundhouse Aquarium Beautification Project – Manhattan Beach, CA
As the Structural Engineer, Mr. Shahi worked directly for the contractor to prepare anchorage and bracing design for the temporarily rehoused aquarium in the modular buildings.

Los Angeles City College, Infrastructure and Energy Upgrade – Los Angeles, CA Mr. Shahi served as the Structural Engineer for a complete infrastructure and energy analysis for their campus to respond to the planned campus upgrade. Arup upgraded the central plant, thermal energy storage system, infrastructure, electrical upgrade, telecommunications cabling, and various site-wide security and fire interfaces.

Los Angeles Valley College Media Arts and Performing Arts Building – Los Angeles, CA Mr. Shahi served as the Structural engineer for the two buildings: a two-story above-grade structure with a basement and a two-story steel building. These two buildings provide various spaces for performing arts, media arts, and classroom facilities.

Santa Monica College Student Services Building – Santa Monica, CA Mr. Shahi served as the Structural Engineer for this three-story, 90,000 square feet, student services & administration facilities building. The complex also includes three levels of belowgrade parking for 500 cars. Due to the unique roof structure and the subterranean nature of the new building, this structure is designed as a concrete building.

Santa Monica College, AET Building – Santa Monica, CA
Mr. Shahi served as the Structural Engineer for this 30,000 sq ft new building on SMC’s Academy of Entertainment and Technology campus. The building will contain administrative, office, production, and support facilities and include multiple studios, controls rooms, and computer and telecommunication facilities.

Santa Monica College Existing AET Building – Santa Monica, CA Mr. Shahi served as the Structural Engineer for the renovation of this two-story building that functions as offices, labs, and classrooms.

Santa Monica College KCRW Building – Santa Monica, CA
Mr. Shahi served as the Structural Engineer for this new 52,500 sq ft building to house KCRW’s radio broadcast operations.

Los Angeles International Airport Central Utility Plant Project – Los Angeles, CA Mr. Shahi served as the Lead Structural Engineer for this four-story 80,000 square feet Central Utility Plant Building that is designed as an immediate occupancy structure utilizing a steel moment frame, side plate system, as the lateral system. This was a Design-Build effort with Clark Construction and McCarthy joint venture.

Los Angeles International Airport, Air Freight Building No. 1 – Los Angeles, CA Mr. Shahi Served as Project Manager for the seismic analysis of an existing two-story concrete building to evaluate the impact of adding new concrete slab topping for LAX World Airports.

Museo Soumaya – Mexico City, Mexico
Mr. Shahi served as Structural Engineer for the concept design of this 12,250m2, eight-story museum structure. The complex includes 6,360m2 of exhibit space, a 450-seat auditorium, library, office spaces, a large restaurant and gathering lounge, and two underground levels of storage and restoration labs.

SR. STRUCTURAL ENGINEER – Santosh Shahi, PhD, SE, PE
RELATED EXPERIENCE CONT.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES Michael Kremer, PLS

PROJECT MANAGER
Michael has 49 years of experience in the land surveying field, with approximately 33 years of experience in the Los Angeles/Southern California area. As Survey Manager for Huitt-Zollars’ Southern California offices, he is responsible for all aspects of the daily workflow in both the field and office. Within his region, he is directly responsible for client contacts, marketing, invoicing, billing, and client/company relations. He promotes all aspects of survey work in Los Angeles, Orange, San Diego, Ventura, and Riverside counties. He is responsible for maintaining relationships with both public and private sector work. He has also provided survey support for the Metro Regional Connector, Blue Line, as well as the Westside Extension. Highlights of his career include multiple high-rise projects in downtown Los Angeles, LAX terminals 1-6, LAX runway 25L re-construction, Staples Center, Playa Vista, Aquarium of the Pacific, The Carlyle condominium project, and the Pacific Design Center just to name a few. Kremer has extensive working relationships with all the major developers and contractors in Southern California.

RELEVANT PROJECT EXPERIENCE
ON-CALL SURVEY AND MAPPING, – Simi Valley, CA
Kremer was responsible for the design, construction, and as-built survey support for the City of Simi Valley’s fiscal program of capital improvement projects. This included Los Angeles Avenue Widening Right-of-Way and Topographic Mapping; Los Angeles Avenue Construction Staking; Madera Road Widening; Trunk line Sewer Survey; and street monuments, legal descriptions, and exhibit preparation.

SANTA ANA THE VILLAGE LOT 8, 9, AND 10 STAKING – Oxnard, CA Michael was responsible for the preparation of the subdivision mapping, and final design for Oakwood Communities, Inc, a six multi-family, for-sale neighborhood within the Wagon Wheel development. Designs include precise grading, paving, sewer, water, storm drain, and passive recreational facilities.

ON-CALL SURVEYING SERVICES – Santa Ana, CA
Over the last three years, Huitt-Zollars has provided the City of Santa Ana with over two dozen design surveys.

Kremer has been the project manager for these assignments.

CANYON BOOSTER PUMP EXPANSION – Santa Paula, CA
For this on-call assignment, Huitt-Zollas was tasked with the design for the replacement of an existing booster pump, addition of a second pump, relocation of the pressure reducing valve to above ground, and modifications to the SCADA system to accommodate the upgraded system. Surveying services included topographic and boundary survey for the site. Site improvements were required to provide adequate space around the above ground facilities, including retaining walls, canopies and pavement.

HOLLYWOOD RESERVOIR WATER QUALITY IMPROVEMENT PROJECT – Los Angeles, CA This project included the installation of two 30 million gallon sub pressured tanks, and the movement of 900,000 cubic yards of soil, a 5,000 foot long, 10 foot diameter tunnel as well as extensive site improvements. Michael provided construction support for the field crews along with construction survey management for the client.

WISHING TREE PARK – Torrance, CA
Michael was the project manager for the staking of the park improvement project. Surveying services included coordination of office and field staff of the topographic survey and final delivery. Field survey included all hardscape features, water features, utilities, trees and surrounding walls. Office work included reviewing the Preliminary Title Report, establishing the property boundary, plotting easements and the field coordination of the topographic survey.

OMNITRANS ON-CALL ARCHITECTURAL AND ENGINEERING SERVICES (MNT20-02) – San Bernardino, CA Huitt-Zollars provided an aerial topographic survey, supplemental field topographic survey, and record boundaries for all Omnitrans facilities and task orders. Task Orders have included facility assessments, hazardous materials inspections, materials testing, LED lighting upgrades, methane/hydrogen detection, HVAC replacement, pavement repair, intersection modification, and electric vehicle charging.

PROFESSIONAL EXPERIENCE 49
Years

REGISTRATION
Professional Land Surveyor:

CA #8425

YEARS WITH FIRM
2 RESUMES OF KEY PERSONNEL
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES David Mackey has over 20 years of experience in the preparation of a wide range of mapping projects including ALTA/NSPS Land Title Surveys, Topographic Surveys, Subdivision maps such as Tract Maps, Parcel Maps, and Condominium Plans, Records of Survey preparation, Boundary Analysis, the preparation of legal descriptions, and construction surveying projects. He has been involved in numerous rehabilitation improvements for parks, streets, and intersections using conventional survey, GPS survey, and scanning. With extensive experience in the southern California region, David coordinates field crews, processes field work, and delivers final CAD products

RELEVANT PROJECT EXPERIENCE
Wishing Tree Neighborhood Park, Los Angeles County, CA
As Project Surveyor, Mr. Mackey was responsible for field coordinating for wishing tree park project.

This included coordination of office and field staff of the topographic survey and final delivery. Field survey included all hardscape features, water features, utilities, trees and surrounding walls. Office work included reviewing the Preliminary Title Report, establishing the property boundary, plotting easements and the field coordination of the topographic survey.

On-Call Surveying Services, Planning Area 2, Rancho Mission Viejo, CA Huitt-Zollars provided Survey services that include final mapping and coordination of Tract Maps, Parcel Map 2017-168, Lot Line Adjustments, Records of Survey, Condo Plans, and Corner Records.

Planning Area 2 of The Ranch Plan encompasses 445 acres and includes: 1,100 total dwelling units in 14 residential product types; regional riding and hiking trail, and a class 1 off-road bicycle trail.

Topographic Surveys, Long Beach, CA
Mackey prepared several topographic surveys in the City of Long Beach including: Spring Street, Los Coyotes Diagonal, Wardlow Road and Atlantic Avenue. Work included calculation of street centerlines and Record Right-of-Way lines, processing of field data, preparation of Station and Offset reports and coordinate listings, creation of surface and contours, preparation of digital cross-sections and preparation of final surveys.

On-Call Surveying Services, Santa Ana, CA
Over the last three years, Huitt-Zollars has provided the City of Santa Ana with over two dozen design surveys. Mackey has served as a project surveyor for each one.

On-Call Architectural and Engineering Services (MNT20-02), San Bernardino, CA Huitt-Zollars provided an aerial topographic survey, supplemental field topographic survey, and record boundaries for all Omnitrans facilities and task orders. Task Orders have included facility assessments, hazardous materials inspections, materials testing, LED lighting upgrades, methane/hydrogen detection, HVAC replacement, pavement repair, intersection modification, and electric vehicle charging.

Pacific Electric Bike Trail, Upland, CA
As Project Surveyor, Mr. Mackey was responsible for field coordinating for the bike trail project. This included coordination of office and field staff of the topographic survey and final delivery. Field survey included 50 foot sections along trail, all hardscape features, utilities, trees, HCR and other trail features (trail length 2,500 feet). Office work included preparing a final topography in CAD that included features and contours.

David Mackey, PLS
Sr. Project Surveyor

PROFESSIONAL

EXPERIENCE
25 Years

EDUCATION
BS, Civil Engineering,
California State Polytechnic
University, Pomona

REGISTRATION
Professional Land Surveyor:

CA #8425
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
Bachelor of Science, Civil
Engineering, University of
Texas at Austin, 2009
Master of Science, Civil
Engineering, Cal Poly Pomona,
2017

REGISTRATIONS
Registered Civil Engineer:

California PE C86032

NUMBER OF ACCOUNTS
RESPONSIBLE FOR (PROJECTS):
5 Joshua R. Morgan, PE

REGIONAL GEOTECHNICAL SERVICES MANAGER
Josh Morgan has over 12 years of experience in geotechnical investigations and engineering design. Josh has managed numerous projects across Southern California. He will be Terracon's Primary Contact and will be available for any questions regarding our services.

Josh’s work has encompassed a wide range of projects, including commercial and educational buildings, street improvements, low-impact development stormwater management, and public works projects.

As a manager, Josh oversees all aspects of subsurface exploration programs, obtaining necessary permits, supervising field/lab personnel, and managing subcontractors. He also tracks project budgets and schedules to ensure client satisfaction. In addition to his managerial duties, Josh is responsible for preparing project proposals and geotechnical engineering reports. He performs engineering analysis related to pavement design, shallow and deep foundation design, ground improvement, settlement analysis, liquefaction analysis, infiltration and percolation testing, and retaining wall/shoring/excavation recommendations.

PROJECT EXPERIENCE
 Agoura Hills Stormwater Treatment Facility, Agoura Hills, CA  Transfer Station Water Quality Improvement Project, Culver City  John Anson Ford Park Infiltration Project, Bell Gardens, CA  Garvey Avenue Grade Separation Drainage, El Monte, CA  Mesmer Low Flow Diversion, Culver City, CA
 City wide Storm Drain Point Repair Project, Rancho Palos Verdes  28th Street Storm Drain Infiltration Project, Manhattan Beach, CA  Culver City Diversion Sewer Project – Culver City, CA  Subsurface Infiltration Trench Feasibility Study, Manhattan Beach  California Rehabilitation Center, Norco, CA
 Manhattan Beach Subsurface Infiltration Trench Feasibility Study, Manhattan Beach, CA
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
Master of Science, Civil
Engineering, California State
University, Fullerton, 2008
Bachelor of Science, Civil
Engineering, University of
Mutah, 2002

REGISTRATIONS
Registered Civil Engineer:

California PE C77455, Exp
06/30/2024
Project Management
Professional (PMP) Exp
07/04/2024

NUMBER OF ACCOUNTS
RESPONSIBLE FOR (PROJECTS):
3 Fred Buhamdan, PE, PMP

PRINCIPAL / PROJECT EXECUTIVE
Fred Buhamdan is an office manager and a licensed civil engineer with substantial experience performing geotechnical investigations, engineering design, and project management for Terracon over the past 13 years. These projects included various educational and commercial buildings, renewable energy facilities, retail centers, office/warehouse projects, street improvements, industrial facilities, and public works projects.

His experience includes hundreds of projects involving shallow and deep foundations design, settlement and slope stability analysis, pavement design, geologic hazards analysis preparation of project proposals and geotechnical engineering reports, and construction management.

Fred oversees project budgets and schedules, manages client expectations, handles business development, and supervises engineers, geologists, subconsultants, subcontractors, and laboratory and field personnel.

The following is a representative list of distinguished projects where Fred has fulfilled roles as an engineer of record, project manager, authorized project reviewer, and/or project engineer:

PROJECT EXPERIENCE
 Agoura Hills Stormwater Treatment Facility, Agoura Hills, CA  Utility Maintenance Facility, Huntington Beach, CA
 Rousselle Street Flood Protection Project - Santa Ana, CA  CWE Santa Ana Green Street Urban Greening - Santa Ana, CA  CWE Santa Ana Bristol- Tolliver Urban Greening - Santa Ana, CA  RSCCD: Science Center Project - Santa Ana, CA
 RSCCD: Johnson Student Center - Santa Ana, CA
 Garvey Avenue Grade Separation Drainage, El Monte, CA  Transfer Station Water Quality Improvement Project, Culver City, CA  John Anson Ford Park Infiltration Project, Bell Gardens, CA  Garvey Avenue Grade Separation Drainage, El Monte, CA  Mesmer Low Flow Diversion, Culver City, CA
 City-wide Storm Drain Point Repair Project, Rancho Palos Verdes, CA  28th Street Storm Drain Infiltration Project, Manhattan Beach, CA  SGVCOG ACE Rio Hondo Load Reduction Strategy Design, multiple Cities in LA County, CA
 LA Public Works Compton Creek Low Flow Diversion, Los Angeles, CA  LA Public Works Arroyo Seco Low Flow Diversion, Pasadena, CA  Sterling Avenue and Marshall Blvd. Sewer and Gas Lines, San Bernardino, CA
 Two-Year Sewer Main Rehabilitation Program - Manhattan Beach, CA  Walnut Stormwater Capture and Groundwater Replenishment Basin, Torrance, CA
 Culver City Diversion Sewer Project – Culver City, CA APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES

EDUCATION
Master of Applied Science,
Geotechnical Engineering,
University of British Columbia,
Canada, 1993
Master of Engineering,
Earthquake Engineering,
Kanazawa University, Japan,
1991
Bachelor of Science in Civil
Engineering, University of the
Philippines, Metro Manila,
Philippines, 1984

REGISTRATIONS
California Registered
Geotechnical Engineer
(GE 2724), 2006 - Present
California Registered
Professional Engineer in Civil
Engineering (C 57831),
1998 - Present

AFFILIATIONS
American Society of Civil
Engineers (ASCE)Geo-Institute
California Geotechnical
Engineering Association
(CalGeo)

NUMBER OF ACCOUNTS
RESPONSIBLE FOR (PROJECTS):
4 Carlos V. Amante, PE, GE

SENIOR PROJECT MANAGER
Carlos Amante has over 30 years of experience in geotechnical and earthquake engineering consulting and project management in southern California, where he has provided innovative engineering design solutions for various public works projects.

Carlos is highly experienced in the management and technical delivery of design and construction projects involving complex ground investigation, seismic-resilient design of earthworks and foundations, slope engineering, liquefaction assessment, constructability/value engineering study, construction quality management, materials testing, and special inspection services.

PROJECT EXPERIENCE
 City of Vernon Well No. 22 Structures and Site Improvements, Vernon, CA. Geotechnical Project Manager. Geotechnical investigation for design of structures and site improvements for operating a 1,120-ft deep municipal water supply well.
 City of Laguna Beach Bluebird SOCWA Lift Station Odor Control Improvements, Laguna Beach, CA. Geotechnical Project Manager.

Geotechnical investigation for installation of a biological odor control system for treatment of hydrogen sulfide and other odorous compounds found in municipal wastewater collection systems. The project included the excavation of the existing slope and the construction of a concrete gravity-type retaining wall.
 Orange County Water District (OCWD) Groundwater
Replenishment System Final Expansion Project, Fountain Valley and Huntington Beach, CA. Geotechnical Project Manager.

Geotechnical consultation and observation, materials testing, and inspection services during construction of the proposed expansion of the existing 100-MGD advanced water purification facility, OCSD Plant 2 facilities, and pipeline rehabilitation.
 Elsinore Valley Municipal Water District (EVMWD) Diamond Regional Sewer Lift Station, Lake Elsinore, CA. Principal Engineer/QA-QC Reviewer. Design oversight of geotechnical investigation of lift station consisting of 47-ft by 87-ft concrete structure with two below-grade wet wells about 54 ft deep, diesel generator, odor control system, chemical feed equipment, electrical building, pigging station, flow metering vault and all associated site yard piping and site grading. City of Lynwood Water and Sewer Projects, Lynwood, CA. Geotechnical Project Manager. Geotechnical investigation for proposed replacement of existing 4-inch to 12-inch diameter water and sewer mains located along various city streets.  City of West Covina Cameron Avenue Sewer Main Rehabilitation Project, West Covina, CA. Geotechnical Project Manager.

Geotechnical investigation for the proposed rehabilitation of existing 10- inch diameter, 2,000-ft long, vitrified clay pipe (VCP) sewer main along Cameron Avenue between Citrus Street and 750 feet east of Inman Road.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES www.epdsolutions.com | 3333 Michelson Drive, Suite 500, Irvine, CA 92612 | 949-794-1180 Page 1 of 1 Due Diligence | Entitlement | Environmental Planning | Development & Construction Management | Policy Planning | Technical Services Konstanza Dobreva, JD
Vice President of Environmental Planning

EDUCATION PROFILE
Juris Doctor
Pepperdine University School of Law
Bachelor of Arts, cum laude, Environmental Analysis & Design, Minor in Urban & Regional Planning
University of California, Irvine
Certificate in Alternative Dispute Resolution
Straus Institute

PROFESSIONAL AFFILIATIONS
Board of Directors, Orange County Association of Environmental Professionals Co-chair, Association of Environmental Professionals State Conference (2005 and 2014)
TENURE
Vice President of Environmental Planning, EPD Solutions, Inc., 2020-present Director of Environmental Planning, EPD Solutions, Inc. 2014-2020 Senior Planner, PlaceWorks, 2004-2014
Planning Consultant, Cities of Irvine, Anaheim, Rancho Santa Margarita Planner, City of Lake Forest

REPRESENTATIVE PROJECTS
WELL 28 IS/MND, City of Orange

SIMON RANCH RESERVOIR IS/MND,
City of Tustin
16025 SLOVER AVE, City of Fontana

YORBA VILLAS RESIDENTIAL EIR,
County of San Bernardino
5705 N INDUSTRIAL PKWY,
City of San Bernardino

ARROW ROCHESTER WAREHOUSE,
City of Rancho Cucamonga

DOWNTOWN COMMERCIAL CORE

SPECIFIC PLAN & PROGRAM EIR,
City of Tustin

RIDER COMMERCE CENTER MND,
Riverside County

SADDLEBACK STADIUM EIR
ADDENDUM, City of Mission Viejo

TWELVE OAKS WINERY RESORT
MND, Riverside County

METROPLITAN STATE HOSPITAL
MODERNIZATION MND, City of Norwalk

TRANSIT VILLAGES SPECIFIC PLAN,
City of Redlands

BRODIAEA BUSINESS CENTER MND
ADDENDUM, City of Moreno Valley

TUSTIN HOUSING ELEMENT AND
MND, City of Tustin

WOOD AND LURIN RESIDENTIAL EIR,
City of Riverside
GODDARD SCHOOL @ ATEP EIR

ADDENDUM,
SOCCCD

PROFILE
Konnie’s more than 25 years of public and private sector planning and legal experience have made her an expert in entitlements, environmental and policy planning, a keen analyst and an effective writer of environmental documents. She has managed and prepared environmental documents for a diverse range of projects and clients: smallscale residential and large planned communities, commercial office, industrial, mixeduse, and schools. In law school, Konnie specialized in alternative dispute resolution.

She clerked for two private law firms and the Thousand Oaks City Attorney’s Office.

She was also a full-time extern for the Honorable Warren J. Ferguson, 9th Circuit Court of Appeals. Konnie has been a planner with the City of Lake Forest and a planning consultant for the cities of Irvine, Anaheim, and Rancho Santa Margarita. Her duties included project management, evaluating development proposals, presenting staff reports and resolutions before the Zoning Administrator and Planning Commission, evaluating grading and building plans, and environmental review and documentation.

Konnie’s diverse planning and legal experience provides her with a unique understanding of planning and zoning law, and the California Environmental Quality Act (CEQA). She is a frequent lecturer on CEQA for the Association of Environmental Professionals (AEP) Advanced CEQA Workshop and CEQA Basics Workshop, which provides training to many of the area developers, agency planners and attorneys.

APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES www.epdsolutions.com | 3333 Michelson Drive, Suite 500, Irvine, CA 92612 | 949-794-1180 Page 1 of 1 Due Diligence | Entitlement | Environmental Planning | Development & Construction Management | Policy Planning | Technical Services Due Diligence | E

EDUCATION PROFILE
Bachelor of Arts in Environmental Studies
University of California, Santa Cruz
Environmental Management Certification
University of California, Irvine

PROFESSIONAL AFFILIATIONS
Board Member: Association of Environmental Professionals Orange County Traffic Engineering Council (OCTEC)
Golden Key Society
TENURE
Senior Technical Planner, EPD Solutions, Inc., 2023-present Transportation Planner, EPD Solutions, Inc., 2021-2023
Assistant Transportation Planner, EPD Solutions, Inc., 2021 Environmental Planner, EPD Solution, Inc. 2019-2021

PROFILE
Alex has more than five years of experience in the areas of environmental and traffic planning and analysis and three years of expertise in climate change, air quality, energy, and greenhouse gas analysis. Alex has worked on traffic projects ranging from focused access studies to large mixed-use projects analyzing more than 50 intersections, roadway segment analyses, and parking analyses. Additionally, Alex has experience in preparing air quality, energy, greenhouse gas, and health risk assessment analyses, spatial analyses using GIS software, and preparing CEQA documents for projects of varying sizes and complexity.

Alex has provided technical expertise to evaluate residential, industrial, commercial, institutional, solar utility, mixed use at a development level, and specific plans at a planning level. Alex has also showed valuable leadership at EPD Solutions by starting the air quality, energy, greenhouse gas, and health risk assessment technical discipline, as well as developing the transportation skills of new hires.

Alex's recent local experience includes technical analysis to support the Santa Ana / Live Oak Warehouse Project in Fontana, Bloomington Business Park in San Bernardino County, and the KIA Dealership in Moreno Valley.

Alex Garber
Senior Technical Planner

REPRESENTATIVE PROJECTS

SIMON RANCH RESERVOIR,
City of Tustin

SANTA ANA/LIVE OAK WAREHOUSE

TRAFFIC ANALYSIS AND AIR QUALITY,
ENERGY, GHG REPORT,City of Fontana

BLOOMINGTON BUSINESS PARK

SPECIFIC PLAN TRAFFIC IMPACT

ANALYSIS AND EIR,
County of San Bernardino
5770 INDUSTRIAL PARKWAY AQ,

ENERGY, GHG REPORT AND HEALTH

RISK ASSESSMENT,
City of San Bernardino
ZEST 2.0 AT 747 N BARRANCA AQ AND

GHG ANALYSIS,
City of Jurupa Valley

PACIFICA ALESSANDRO TRAFFIC

ANALYSIS AND AIR QUALITY, ENERGY,
GHG REPORT, City of Moreno Valley

IRVINE VALLEY COLLEGE STUDENT

HOUSING AQ AND GHG ANALYSIS,
SOCCCD

TRADE AND COMMERCE AIR QUALITY,

ENERGY, GHG, AND HEALTH RISK

ASSESSMENT REPORTS,
City of Palmdale

CSG SOLAR PROJECTS TRAFFIC

ANALYSIS AND AIR QUALITY AND GHG
REPORT, Kings County

TEMECULA VALLEY CHARTER

SCHOOL TRAFFIC IMPACT ANALYSIS,
County of Riverside

THE BOWERY TRAFFIC IMPACT
ANALYSIS, City of Santa Ana
5705 N INDUSTRIAL WAY AQ,

ENERGY, AND GHG ANALYSIS,
City of San Bernardino
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ,ĂLJǁĂƌĚ;ŽƌƉŽƌĂƚĞͿͮ&ƌĞƐŶŽͮ>ŽƐŶŐĞůĞƐͮd͘;ϰϬϴͿϵϴϴͲϬϭϬϭͮ&͘;ϰϬϴͿϵϴϴͲϬϭϬϯͲ ǁǁǁ͘ďĞƐƐƚĞƐƚůĂď͘ĐŽŵ Education
h͘^͘DĂƌŝŶĞ
ŽƌƉƐ͕DZ
^ĂŶŝĞŐŽ͕
ϭϵϵϮ
ůĂƌĞŵŽŶƚ͕
^ĂŶŶƚŽŶŝŽ
,ŝŐŚ^ĐŚŽŽů
ŝƉůŽŵĂϭϵϵϮ
Skills
hƚŝůŝƚLJ>ŽĐĂƚŝŶŐ
WŽƚŚŽůŝŶŐ
WƌŽũĞĐƚDĂŶĂŐĞŵĞŶƚ
dƌĂĨĨŝĐŽŶƚƌŽů
Phone Number
;ϵϬϵͿϱϭϬͲϱϱϯϱ
ŽŶĂůĚ ŚĂƐŵĂŶĂŐĞĚŶƵŵĞƌŽƵƐƵƚŝůŝƚLJůŽĐĂƚŝŶŐƉƌŽũĞĐƚƐŽǀĞƌƚŚĞƉĂƐƚϮϯ LJĞĂƌƐĨŽƌǀĂƌŝŽƵƐ KdƐ͕ŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕ĂŶĚƉƵďůŝĐĂŶĚƉƌŝǀĂƚĞƐĞĐƚŽƌĐůŝĞŶƚƐ͘,ĞǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌ ƚŚĞ ŵĂŶĂŐĞŵĞŶƚĂŶĚĐŽŽƌĚŝŶĂƚŝŽŶŽĨƵƚŝůŝƚLJ ƐĞƌǀŝĐĞƐ͘,ĞǁŝůůĚĞǀĞůŽƉŵƵůƚŝƉůĞĚĞƉĂƌƚŵĞŶƚ ƐĞƌǀŝĐĞ ƐĐŚĞĚƵůĞƐĂŶĚŵĂŝŶƚĂŝŶƚŚŽƐĞƐĐŚĞĚƵůĞƐƚŚƌŽƵŐŚŽƵƚƚŚĞĚƵƌĂƚŝŽŶŽĨƚŚĞƉƌŽũĞĐƚ͘ ,ĞǁŝůůƉƌĞƉĂƌĞ ƐƚĂĨĨŚŽƵƌƐĂŶĚ ĨĞĞĞƐƚŝŵĂƚĞƐ ĨŽƌ ƚŚĞĐŽŵďŝŶĞĚƉƌŽũĞĐƚ ƚĞĂŵƐ͘,Ğǁŝůů ƌĞǀŝĞǁ ƚŚĞ ƉƌŽŐƌĞƐƐ ŽĨ ƐĞƌǀŝĐĞƐ ƚŽ ĞŶƐƵƌĞ ƚŚĂƚ ƚŚĞ ƐƚĂŶĚĂƌĚƐ͕ ƚŝŵĞ ŐŽĂůƐ͕ ĂŶĚ ďƵĚŐĞƚ ƌĞƋƵŝƌĞŵĞŶƚƐĂƌĞ ŵĞƚ͘
Professional Experience
ϮϬϭϲ – WƌĞƐĞŶƚ ĞƐƐdĞƐƚůĂď͕ /ŶĐ͘
WƌŽũĞĐƚDĂŶĂŐĞƌ
ŽŶĂůĚtŚŝƚŵĂŶŝƐƌĞƐƉŽŶƐŝďůĞĨŽƌƚŚĞƚĞĐŚŶŝĐĂůƉƌŽũĞĐƚĞdžĞĐƵƚŝŽŶ͕ŝŶĐůƵĚŝŶŐŽǀĞƌƐĞĞŝŶŐ ĐƌĞǁƐ͕ĞƋƵŝƉŵĞŶƚ͕ƉƌŽũĞĐƚƉƌŽŐƌĞƐƐ͕ƐĂĨĞƚLJ͕ ĂŶĚƋƵĂůŝƚLJĐŽŶƚƌŽů͘^ƵƉĞƌǀŝƐŽƌŽĨ ĨŝĞůĚĐƌĞǁƐ ĂŶĚĞdžƉĞƌŝĞŶĐĞĚŝŶĂůůůĞǀĞůƐŽĨ^ƵďƐƵƌĨĂĐĞhƚŝůŝƚLJ
ŶŐŝŶĞĞƌŝŶŐƚŽŵĞŶƚŝŽŶĂ ĨĞǁ͕hƚŝůŝƚLJ
>ŽĐĂƚŝŶŐĂŶĚsĂĐƵƵŵ
džĐĂǀĂƚŝŽŶ;WŽƚŚŽůŝŶŐͿ͘
ϮϬϬϬ – ϮϬϭϲ ^&ͲƌͲ/'hƚŝůŝƚLJ^ƵƌǀĞLJƐ/ŶĐ͘
WƌŽũĞĐƚDĂŶĂŐĞƌ
'ĞŶĞƌĂƚĞĚĂŶĚĞdžĞĐƵƚĞĚ ƐĐŽƉĞĂŶĚͬŽƌ ĨĞĞ ƉƌŽƉŽƐĂůƐ͕ĂŐƌĞĞŵĞŶƚƐ͕ ĂŶĚŵĂƐƚĞƌ ƐĞƌǀŝĐĞ ĐŽŶƚƌĂĐƚƐ͕ŝŶĐůƵĚŝŶŐĂŵĞŶĚŵĞŶƚƐĂŶĚƐĐŽƉĞĐŚĂŶŐĞƐĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐǀĂƌŝŽƵƐůĞǀĞůƐ ŽĨ^ƵďƐƵƌĨĂĐĞhƚŝůŝƚLJ
ŶŐŝŶĞĞƌŝŶŐ͘ŽůůĞĐƚĞĚĂŶĚĚŝƌĞĐƚĞĚƚŚĞĐŽůůĞĐƚŝŽŶŽĨƵƚŝůŝƚLJƌĞĐŽƌĚƐ ĂŶĚ ĂƐͲďƵŝůƚ ƵƚŝůŝƚLJĚĂƚĂ ĨƌŽŵƉƌŝǀĂƚĞĂŶĚŵƵŶŝĐŝƉĂůĂŐĞŶĐŝĞƐ ĨŽƌƵƐĞďLJ ĨŝĞůĚĂŶĚŽĨĨŝĐĞ ƉĞƌƐŽŶŶĞů͘
ƐƚĂďůŝƐŚĞĚ ǁŽƌŬ ƉůĂŶƐ ŝŶĐůƵĚŝŶŐ ƐƚĂĨĨŝŶŐ ĂŶĚ ƌĞƐŽƵƌĐĞƐ ĨŽƌ ĞĂĐŚ ƉŚĂƐĞ ŽĨ ƉƌŽũĞĐƚƐĂŶĚĚŝƌĞĐƚĞĚƌĞĐƌƵŝƚŵĞŶƚŽĨƉƌŽũĞĐƚƉĞƌƐŽŶŶĞů͘ Related Experience
>ŽƵŶƚLJĞƉĂƌƚŵĞŶƚŽĨWƵďůŝĐtŽƌŬƐKŶĂůůWŽƚŚŽůŝŶŐ^ĞƌǀŝĐĞƐŽŶƚƌĂĐƚ &ƵƌŶŝƐŚĂůůůĂďŽƌ͕ŵĂƚĞƌŝĂůƐ͕ƉĂƌƚƐ͕ ĂŶĚĞƋƵŝƉŵĞŶƚŶĞĐĞƐƐĂƌLJƚŽƉƌŽǀŝĚĞƌŽƵƚŝŶĞƉŽƐŝƚŝǀĞ ůŽĐĂƚŝŽŶ;ƉŽƚŚŽůŝŶŐͿƐĞƌǀŝĐĞƐƵƐŝŶŐǀĂĐƵƵŵĞdžĐĂǀĂƚŝŽŶ͕ŚĂŶĚĞdžĐĂǀĂƚŝŽŶ͕ŽƌĐŽŵƉĂƌĂďůĞ ŵĞƚŚŽĚƐƚŽůŽĐĂƚĞƵŶĚĞƌŐƌŽƵŶĚƵƚŝůŝƚŝĞƐ͕ŝŶĐůƵĚŝŶŐďƵƚŶŽƚůŝŵŝƚĞĚƚŽ͖ƉĞƚƌŽůĞƵŵ͕ĚĂƚĂ ƚƌĂŶƐŵŝƐƐŝŽŶ͕ƚĞůĞƉŚŽŶĞ͕ŐĂƐ͕ĞůĞĐƚƌŝĐ͕ǁĂƚĞƌĂŶĚƐĞǁĞƌƉŝƉĞůŝŶĞƐ͕ĂŶĚƉĞƌĨŽƌŵŽƚŚĞƌ ƌĞůĂƚĞĚƐĞƌǀŝĐĞƐ͘WƌŽǀŝĚĞĂǁƌŝƚƚĞŶƌĞƉŽƌƚƐƚĂƚŝŶŐƚŚĞĚĂƚĞĨŽƌƚŚĞĞdžĂĐƚůŽĐĂƚŝŽŶŽĨĞĂĐŚ ǁŽƌŬ ĂƐƐŝŐŶŵĞŶƚƐŝƚĞ͘
ZŽůĞͲ WƌŽũĞĐƚDĂŶĂŐĞƌ– ƵƌƌĞŶƚůLJĂŶŽŶŐŽŝŶŐ ƉƌŽũĞĐƚ
ŽĂĐŚĞůůĂsĂůůĞLJŝƐƚƌŝĐƚ/ƌƌŝŐĂƚŝŽŶ>ĂƚĞƌĂůϭϭϵ͘ϲϰͲϳ͘ϱ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚ WƌŽǀŝĚĞƵƚŝůŝƚLJůŽĐĂƚŝŶŐ͕ƉŽƚŚŽůŝŶŐƐĞƌǀŝĐĞƐ͕ ĂŶĚŶĞĐĞƐƐĂƌLJƚƌĂĨĨŝĐĐŽŶƚƌŽůĂůŽŶŐƚŚĞ ƉƌŽƉŽƐĞĚĂůŝŐŶŵĞŶƚŽĨϭϲ͕ϬϬϬĨĞĞƚŽĨƚŚĞƉŝƉĞůŝŶĞƵƐŝŶŐǀĂĐƵƵŵĞdžƚƌĂĐƚŝŽŶƚŽƉŽƐŝƚŝǀĞůLJ ůŽĐĂƚĞĞdžŝƐƚŝŶŐƵƚŝůŝƚLJĐŽŶĨůŝĐƚƐƐƵĐŚĂƐƚĞůĞƉŚŽŶĞ͕ŐĂƐ͕ĞůĞĐƚƌŝĐ͕ǁĂƚĞƌ͕ƉĞƚƌŽůĞƵŵ͕ ĂŶĚ ǀĂƌŝŽƵƐĐŽŶŶĞĐƚŝŽŶƉŽŝŶƚƐ͘WƌŽǀŝĚĞĂǁƌŝƚƚĞŶƌĞƉŽƌƚƐƚĂƚŝŶŐƚŚĞĚĂƚĞĨŽƌƚŚĞĞdžĂĐƚ ŝŶĐůƵĚŝŶŐďƵƚŶŽƚůŝŵŝƚĞĚƚŽƚŚĞƚLJƉĞ͕ƐŝnjĞ͕ĂŶĚĚĞƉƚŚŽĨƚŚĞƵƚŝůŝƚLJĨĂĐŝůŝƚLJĂŶĚ͕ŝĨƉƌĞƐĞŶƚ͕ ƚŚĞƚŚŝĐŬŶĞƐƐŽĨƚŚĞƉĂǀĞŵĞŶƚ͘
ZŽůĞͲ WƌŽũĞĐƚDĂŶĂŐĞƌ
Donald Whitman
Project Manager
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ϲ
MR. NOAH HELLER - PRESIDENT

AND PRINCIPAL HYDROGEOLOGIST
<'ZKhE
Dƌ͘,ĞůůĞƌŝƐĂŐĞŽůŽŐŝƐƚǁŝƚŚϯϱLJĞĂƌƐŽĨƉƌŽĨĞƐƐŝŽŶĂůĞdžƉĞƌŝĞŶĐĞĂŶĚ ŝƐWƌĞƐŝĚĞŶƚŽĨĞƐƚ
ŶǀŝƌŽŶŵĞŶƚĂů^ƵďƐƵƌĨĂĐĞ ^ĂŵƉůŝŶŐ dĞĐŚŶŽůŽŐŝĞƐ͕
/ŶĐ͘;ĚďĂ
^^dͿĨŽƵŶĚĞĚƵŐƵƐƚϭϵϵϵ͘Dƌ͘,ĞůůĞƌŚŽůĚƐĂĨƌŽŵ
ZƵƚŐĞƌƐhŶŝǀĞƌƐŝƚLJĂŶĚD^ĚĞŐƌĞĞĨƌŽŵDŝƐƐŝƐƐŝƉƉŝ^ƚĂƚĞhŶŝǀĞƌƐŝƚLJ͕ ďŽƚŚŝŶŐĞŽůŽŐLJ ďƵƚǁŝƚŚĂƐƚƌŽŶŐĨŽĐƵƐŽŶƉĞƚƌŽůĞƵŵĞdžƉůŽƌĂƚŝŽŶĨŽƌ ŚŝƐD^ĚĞŐƌĞĞ͘ƐƐƵĐŚ͕ŐƌĂĚƵĂƚĞƐƚƵĚŝĞƐĂŶĚƚŚĞƐŝƐĨŽĐƵƐĞĚŽŶ ƐĞĚŝŵĞŶƚŽůŽŐLJĂŶĚƉĞƚƌŽůĞƵŵĞdžƉůŽƌĂƚŝŽŶŵĞƚŚŽĚƐ ƵƐŝŶŐŐĞŽƉŚLJƐŝĐĂů ƚŽŽůƐ͕ŝŶĐůƵĚŝŶŐĨŽƌŵĂůĐŽƵƌƐĞǁŽƌŬŝŶĞůĞĐƚƌŝĐůŽŐĂŶĚĐƌŽƐƐƐĞĐƚŝŽŶ ĂŶĂůLJƐŝƐ ĂŶĚǁĞůůĨŝĞůĚĚĞǀĞůŽƉŵĞŶƚ͘dŚĞƐĞƐƚƵĚŝĞƐƌĞƐƵůƚĞĚŝŶ ŝĚĞŶƚŝĨŝĐĂƚŝŽŶŽĨĂŶŽŝůĂŶĚŐĂƐĨŝĞůĚůŽĐĂƚĞĚŝŶƚŚĞůĂĐŬtĂƌƌŝŽƌĂƐŝŶ͘ Dƌ͘,ĞůůĞƌŝƐĂůŝĐĞŶƐĞĚ ƉƌŽĨĞƐƐŝŽŶĂůŐĞŽůŽŐŝƐƚŝŶĂůŝĨŽƌŶŝĂ͘ D/E
Z>K'zED/E
Z>
yW>KZd/KE
Mr. Heller’s ŝŶĚƵƐƚƌLJĞdžƉĞƌŝĞŶĐĞďĞŐĂŶŝŶϭϵϴϰ͕ǁŽƌŬŝŶŐĂƐĂ ŵŝŶĞƌĂůŽŐŝƐƚĨŽƌŵŽĐŽDŝŶĞƌĂůƐ͘,ĞǁĂƐƌĞƐƉŽŶƐŝďůĞĨŽƌƉĞƌĨŽƌŵŝŶŐ ĚĞƚĂŝůĞĚŵŝŶĞƌĂůŽŐŝĐĂůĂŶĂůLJƐĞƐŽĨŽƌĞďŽĚŝĞƐƵƐŝŶŐdžͲƌĂLJŵŝŶĞƌĂůŽŐLJ ĂŶĚdžͲƌĂLJĨůƵŽƌĞƐĐĞŶĐĞĂƐǁĞůůĂƐƐĐĂŶŶŝŶŐĞůĞĐƚƌŽŶŵŝĐƌŽƐĐŽƉLJĂŶĚ ƚŚŝŶƐĞĐƚŝŽŶĂŶĂůLJƐŝƐƵƐŝŶŐƉŽůĂƌŝnjŝŶŐůŝŐŚƚŵŝĐƌŽƐĐŽƉLJ͘,ĞĂůƐŽ ĚĞǀĞůŽƉĞĚƐŽĨƚǁĂƌĞ͕ĂƵƚŽŵĂƚŝŶŐƚŚĞŵŝŶĞƌĂůŽŐŝĐĂůĂŶĂůLJƐŝƐƵƐŝŶŐ ŝƚĞƌĂƚŝǀĞƐŝŵƵůƚĂŶĞŽƵƐĞƋƵĂƚŝŽŶƐ͘&ƌŽŵϭϵϴϳƚŚƌŽƵŐŚϭϵϵϬ͕Dƌ͘ ,ĞůůĞƌǁŽƌŬĞĚŽŶůĂƌŐĞƐĐĂůĞ͕ ŚĂƌĚͲƌŽĐŬ͕ŐŽůĚĞdžƉůŽƌĂƚŝŽŶĂŶĚŵŝŶĞ ĚĞǀĞůŽƉŵĞŶƚƉƌŽũĞĐƚƐ͕ŐĞŽůŽŐŝĐƐƵƌĨĂĐĞ ĂŶĚƐƵďƐƵƌĨĂĐĞ ŵĂƉƉŝŶŐĂŶĚ ƉĞƌĨŽƌŵŝŶŐĐŽŵƉůĞdžĐƌŽƐƐƐĞĐƚŝŽŶ ĂŶĂůLJƐĞƐ͘KƚŚĞƌĂĐƚŝǀŝƚŝĞƐŝŶĐůƵĚĞĚ ƉĞƌĨŽƌŵŝŶŐŵĂŐŶĞƚŝĐƐƵƌǀĞLJƐ͕ĐŽƌĞůŽŐŐŝŶŐ͕ƵŶĚĞƌŐƌŽƵŶĚŵŝŶĞ ŵĂƉƉŝŶŐĂŶĚƚŚŝŶƐĞĐƚŝŽŶĂŶĂůLJƐĞƐ͘Dƌ͘,ĞůůĞƌŚĂƐĂƉƉůŝĞĚƚŚŝƐ ŬŶŽǁůĞĚŐĞƚŽǀĂƌŝŽƵƐŚĂƌĚͲƌŽĐŬƉƌŽũĞĐƚƐŝŶƚŚĞŐƌŽƵŶĚǁĂƚĞƌ ƌĞƐŽƵƌĐĞƐŝŶĚƵƐƚƌLJ͘

Es/ZKED
Ed>
/n the early 1990’s Mr. Heller began working for Jacobs Engineering ĂŶĚǁĂƐĂƐƐŝŐŶĞĚĂƐĂƚĞĐŚŶŝĐĂůŵĂŶĂŐĞƌƚŽŽƌŐĂŶŝnjĞĂŶĚŽǀĞƌƐĞĞ ůĂƌŐĞͲƐĐĂůĞ ĞŶǀŝƌŽŶŵĞŶƚĂůŝŶǀĞƐƚŝŐĂƚŝǀĞĚƌŝůůŝŶŐƉƌŽũĞĐƚƐĂƚDĐ>ĞůůĂŶ ĂŶĚĂƐƚůĞŝƌ&ŽƌĐĞĂƐĞƐ͘dŚĞĐŽůůĞĐƚŝǀĞŝŶĚƵƐƚƌŝĂůĞdžƉĞƌŝĞŶĐĞ ŝŶĐůƵĚĞĚ ŵĂŶĂŐŝŶŐƵƉƚŽƚĞŶĚƌŝůůŝŶŐŽƉĞƌĂƚŝŽŶƐĂƚŽŶĞƚŝŵĞ͕ ĞůĞĐƚƌŝĐ FIRM
BESST, Inc.

EXPERIENCE
35 years (24 at BESST)

EDUCATION
BA Geology, Rutgers University
MS Geology, Mississippi State
University
California PG 5792
Publications and US Patents (see
below)
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ϳ
ůŽŐĂŶĂůLJƐŝƐ͕ŝŶƐƚĂůůĂƚŝŽŶŽǀĞƌƐŝŐŚƚŽĨ ŐƌŽƵŶĚǁĂƚĞƌĞdžƚƌĂĐƚŝŽŶǁĞůůƐ͕ŚƵŶĚƌĞĚƐŽĨŵŽŶŝƚŽƌŝŶŐǁĞůůƐĂŶĚŵĂŶLJ ƚŚŽƵƐĂŶĚƐŽĨĚĞƉƚŚĚŝƐĐƌĞƚĞƐŽŝůŐĂƐĂŶĚŐƌŽƵŶĚǁĂƚĞƌƐĂŵƉůĞƐ͘Dƌ͘ ,ĞůůĞƌŐĂŝŶĞĚĂƐƚƌŽŶŐǁŽƌŬŝŶŐŬŶŽǁůĞĚŐĞŽĨ ǀĂƌŝŽƵƐĚƌŝůůŝŶŐĂŶĚƐĂŵƉůŝŶŐŵĞƚŚŽĚƐǁŚŝĐŚůĞĚƚŽǀĂƌŝŽƵƐŝĚĞĂƐŽŶŚŽǁƚŽŝŵƉƌŽǀĞƵƉŽŶĚŽǁŶŚŽůĞĚŝĂŐŶŽƐƚŝĐ ŵĞƚŚŽĚƐ͖ĨŽĐƵƐĞĚŝŶ ǁĂƚĞƌĐŚĞŵŝƐƚƌLJ͘ Dƌ͘,ĞůůĞƌŚĂƐĞdžƚĞŶƐŝǀĞĞdžƉĞƌŝĞŶĐĞǁŝƚŚŵƵĚƌŽƚĂƌLJ͕ĂŝƌƌŽƚĂƌLJĐĂƐŝŶŐ ŚĂŵƉĞƌ͕ĚƵĂůǁĂůůƉĞƌĐƵƐƐŝŽŶ͕ƐŽŶŝĐ͕ŚŽůůŽǁƐƚĞŵĂƵŐĞƌ͕ĚƵĂůƚƵďĞƌŽƚĂƌLJĂŶĚĚŝƌĞĐƚƉƵƐŚŵĞƚŚŽĚƐ͘ 
^^d͕/E͗͘ϭϵϵϵͲWZ
^
Ed
dŚĞĞĂƌůLJLJĞĂƌƐŽĨ
^^dǁĞƌĞĨŽĐƵƐĞĚŽŶƉƌŽĚƵĐƚĚĞǀĞůŽƉŵĞŶƚ ŽĨǀĂƌŝŽƵƐƐƵďƐƵƌĨĂĐĞƐĂŵƉůŝŶŐƚĞĐŚŶŽůŽŐŝĞƐƚŽ ŝŵƉƌŽǀĞǁĂƚĞƌĐŚĞŵŝƐƚƌLJƐĂŵƉůŝŶŐǁŚŝĐŚůĞĚƚŽƚŚĞĚĞǀĞůŽƉŵĞŶƚŽĨƚŚĞ^ŝŵƵůWƌŽďĞ͕/^dĂŶĚ,LJĚƌŽŽŽƐƚĞƌ ƚĞĐŚŶŽůŽŐŝĞƐ͘/ŶϮϬϬϮ͕
^^dǁĂƐĂǁĂƌĚĞĚĂƌĞƐĞĂƌĐŚĂŶĚĚĞǀĞůŽƉŵĞŶƚĐŽŶƚƌĂĐƚďLJƚŚĞh^'ĞŽůŽŐŝĐĂů ^ƵƌǀĞLJƚŽ ĚĞƐŝŐŶĂŶĚĐƌĞĂƚĞĂŵŝŶŝĂƚƵƌŝnjĞĚ͕ĚĞĞƉͲǁĞůůƉƵŵƉŝŶŐƐLJƐƚĞŵ͖ƐƵďƐĞƋƵĞŶƚůLJĐĂůůĞĚƚŚĞ,LJĚƌŽŽŽƐƚĞƌ͘ 
^^d͕/E͗͘ϮϬϬϱͲWZ
^
Ed
h^'^dZ
Z&>KtD
d
ZE
Wd,
W
E
Ed^DW>
Z͗
&ŽůůŽǁŝŶŐĂƐƵĐĐĞƐƐĨƵůZΘĐŽŶƚƌĂĐƚǁŝƚŚƚŚĞh^'^͕
^^dǁĂƐĂǁĂƌĚĞĚĂŶĞdžĐůƵƐŝǀĞůŝĐĞŶƐĞďLJƚŚĞh^'^ƚŽƚŚĞŝƌ ƉĂƚĞŶƚĞĚǁĞůůƉƌŽĨŝůŝŶŐƚĞĐŚŶŽůŽŐLJ͘^ŝŶĐĞĞĂƌůLJϮϬϬϱ͕ ^^dŚĂƐƉƌŽĨŝůĞĚŽǀĞƌϭ͕ϬϬϬĚLJŶĂŵŝĐĂŶĚĂŵďŝĞŶƚƐƵƌǀĞLJƐ ŽĨǁĂƚĞƌƐƵƉƉůLJǁĞůůƐ͕ŝŶĐůƵĚŝŶŐƉŽƚĂďůĞĚƌŝŶŬŝŶŐǁĂƚĞƌǁĞůůƐ͕ƚĞƐƚǁĞůůƐĂŶĚĂŐƌŝĐƵůƚƵƌĂůǁĞůůƐ͘WƌŽĨŝůŝŶŐƉƌŽũĞĐƚƐ ŚĂǀĞĨŽĐƵƐĞĚŽŶ ŵĞƚĂůƐ͕ƌĂĚŝŽŶƵĐůŝĚĞƐ͕ŐĞŶĞƌĂůŵŝŶĞƌĂůƐ͕ĚŝƐƐŽůǀĞĚŐĂƐĞƐ ƐƵĐŚĂƐŵĞƚŚĂŶĞĂŶĚŚLJĚƌŽŐĞŶƐƵůĨŝĚĞ͕ ŽdžLJŐĞŶĂŶĚŚLJĚƌŽŐĞŶŝƐŽƚŽƉĞƐ͕ďĂĐƚĞƌŝĂ͕ƚƵƌďŝĚŝƚLJ͕ZKĨŽƵůĂŶƚƐ;ŝ͘Ğ͘^ŝůƚĞŶƐŝƚLJ/ŶĚĞdžͿ͕ĂŶĚĂǁŝĚĞƌĂŶŐĞŽĨ ĂŶƚŚƌŽƉŽŐĞŶŝĐ ĐŽŵƉŽƵŶĚƐŝŶĐůƵĚŝŶŐŶŝƚƌĂƚĞ͕sKƐ͕ƉĞƌĐŚůŽƌĂƚĞĂŶĚŽƚŚĞƌƐ͘ ^^dŚĂƐŵĂĚĞƐŝŐŶŝĨŝĐĂŶƚĂĚǀĂŶĐĞƐ
ƚŽƚŚĞh^'^ƚĞĐŚŶŽůŽŐŝĞƐĂŶĚŚĂƐďĞĞŶĂǁĂƌĚĞĚƚǁŽŝŵƉƌŽǀĞŵĞŶƚ ƉĂƚĞŶƚƐĨŽƌ^ĞůĞĐƚŝǀĞ džƚƌĂĐƚŝŽŶŽĨ&ůƵŝĚŝŶ
tĞůůƐĂŶĚŽƌĞŚŽůĞƐĂƐǁĞůůĂƐĂŶŽƚŚĞƌƚǁŽŝŵƉƌŽǀĞŵĞŶƚƉĂƚĞŶƚƐ describing “Sideways Injection” of tracers to ĂĐĐƵƌĂƚĞůLJĐĂůĐƵůĂƚĞnjŽŶĂůŝŶĨůŽǁŽĨĨůƵŝĚƐŝŶƚĞƐƚďŽƌĞŚŽůĞƐĂŶĚƉƵŵƉŝŶŐĂŶĚŶŽŶͲƉƵŵƉŝŶŐǁĞůůƐ ĂŶĚ ĂĐŽŵďŝŶĞĚ njŽŶĂůĨůŽǁĂŶĚǁĂƚĞƌƐĂŵƉůŝŶŐƚĞĐŚŶŽůŽŐLJŝŶƚŽĂƐŝŶŐƵůĂƌůLJĐŽŶũŽŝŶĞĚ ĚŽǁŶŚŽůĞƉƌŽĨŝůŝŶŐƐLJƐƚĞŵ ;ĐĂůůĞĚhE/W^^Ϳ͘ KŚĞƌƌĞůĂƚĞĚĂĚǀĂŶĐĞƐŝŶĐůƵĚĞƐŽĨƚǁĂƌĞĚĞǀĞůŽƉŵĞŶƚĂŶĚĚĞǀĞůŽƉŵĞŶƚŽĨĚŽǁŶŚŽůĞůĂƐĞƌƐĨŽƌŵĞĂƐƵƌŝŶŐĂŵďŝĞŶƚ ŐƌŽƵŶĚǁĂƚĞƌĨůŽǁŝŶŐƌŽƵŶĚǁĂƚĞƌƉƌŽĚƵĐƚŝŽŶĂŶĚ ŵŽŶŝƚŽƌŝŶŐǁĞůůƐ ƵƐŝŶŐůĂƐĞƌŝŶĚƵĐĞĚĨůƵŽƌĞƐĐĞŶĐĞ͘ KǀĞƌƚŚĞ ƉĂƐƚϭϬLJĞĂƌƐ͕
^^dŚĂƐƐĞĞŶĂƐŝŐŶŝĨŝĐĂŶƚŐƌŽǁƚŚŝŶďĞŝŶŐƐŽůĞƐŽƵƌĐĞĚĨŽƌ^ƚĂƚĞŽĨĂůŝĨŽƌŶŝĂWƌŽƉϭƉƌŽũĞĐƚƐ where BESST’s ǀĞƌƐŝŽŶŽĨƚŚĞh^'^ƚĞĐŚŶŽůŽŐLJŝƐƐƉĞĐŝĨŝĞĚ͘ t
>>DK/&/d/KE^
KǀĞƌƚŚĞƉĂƐƚϭϳ LJĞĂƌƐ͕Dƌ͘,ĞůůĞƌĂŶĚƚŚĞ
^^dƚĞĂŵŚĂǀĞŐĂŝŶĞĚŵƵĐŚĞdžƉĞƌŝĞŶĐĞŝŶ ǁĞůůŵŽĚŝĨŝĐĂƚŝŽŶ͕ ŚLJĚƌĂƵůŝĐĂůůLJŵĂŶŝƉƵůĂƚŝŶŐǁĞůůƐƚŽĂĐŚŝĞǀĞƐƉĞĐŝĨŝĐǁĂƚĞƌĐŚĞŵŝƐƚƌLJŐŽĂůƐ͕ŝŶĐůƵĚŝŶŐƚƌĞĂƚŵĞŶƚĂǀŽŝĚĂŶĐĞĂŶĚ ŵŝŶŝŵŝnjĂƚŝŽŶĂƐǁĞůůĂƐƚƌĞĂƚŵĞŶƚŽƉƚŝŵŝnjĂƚŝŽŶ͘tŝƚŚŽǀĞƌϯϬϬ ŵŽĚŝĨŝĐĂƚŝŽŶƉƌŽũĞĐƚƐ͕ ^^dŚĂƐŐĂŝŶĞĚƐŝŐŶŝĨŝĐĂŶƚ
ĞdžƉĞƌŝĞŶĐĞŝŶǁƌŝƚŝŶŐǁŽƌŬƉůĂŶƐĨŽƌƚŚĞƐĞƉƌŽũĞĐƚƐĂƐǁĞůůĂƐƉƌŽǀŝĚŝŶŐĨŝĞůĚŽǀĞƌƐŝŐŚƚĂŶĚĐĞƌƚŝĨŝĞĚŝŶƐƚĂůůĂƚŝŽŶ ƌĞƉŽƌƚƐ͘tĞůůŵŽĚŝĨŝĐĂƚŝŽŶƐŚĂǀĞŝŶĐůƵĚĞĚĐŚĂŶŐĞŽĨƉƵŵƉŝŶŐƌĂƚĞ͕ƌĞůŽĐĂƚŝŽŶŽĨƚŚĞƉƵŵƉŝŶƚĂŬĞ͕ƉĂĐŬĞƌ ŝŶƐƚĂůůĂƚŝŽŶƐ͕ďĂĐŬĨŝůůŝŶŐǁĞůůƐ͕ĚĞƐŝŐŶĂŶĚŝŶƐƚĂůůĂƚŝŽŶŽĨĞŶŐŝŶĞĞƌĞĚƐƵĐƚŝŽŶƐĂŶĚŵŽƌĞŶŽǀĞů͕ĐƵƐƚŽŵŝnjĞĚĚĞƐŝŐŶƐ͘ >KE'^Z

E
d
^dt
>>^
&ƌŽŵϭϲLJĞĂƌƐŽĨĞdžƉĞƌŝĞŶĐĞǁŝƚŚƚŚĞdƌĂĐĞƌ&ůŽǁŵĞƚĞƌĂŶĚĞƉƚŚĞƉĞŶĚĞŶƚ^ĂŵƉůĞƌ͕Dƌ͘,ĞůůĞƌŚĂƐƉŝŽŶĞĞƌĞĚ ĂŶĚĚĞǀĞůŽƉĞĚƚŚĞƉƌŽĐĞĚƵƌĞƐĨŽƌ>ŽŶŐ^ĐƌĞĞŶĞĚdĞƐƚtĞůůƐ͘dŚĞďĂƐŝƐĨŽƌƚŚŝƐĚĞǀĞůŽƉŵĞŶƚŚĂƐďĞĞŶƚŚĞ ǁĂƚĞƌ ƋƵĂůŝƚLJĨĂŝůƵƌĞŽĨŵĂŶLJ ŶĞǁǁĞůůƐƚŚĂƚ
^^dŚĂƐƉƌŽĨŝůĞĚ͕ ǁŚŝĐŚŵĂŬĞƵƉĂƉƉƌŽdžŝŵĂƚĞůLJϯϱйŽĨŝƚƐ ƉƌŽĨŝůŝŶŐ ďƵƐŝŶĞƐƐ͘dŚŝƐůĞĚƚŽƚŚĞƋƵĞƐƚŝŽŶĂƐƚŽǁŚLJƐŽŵĂŶLJŶĞǁǁĞůůƐĨĂŝůďĂƐĞĚŽŶ ŶŽŶͲĐŽŵƉůŝĂŶƚǁĂƚĞƌĐŚĞŵŝƐƚƌLJǁŚĞŶ ŵŽƐƚŽĨƚŚĞƐĞǁĞůůƐĂƌĞƉƌĞĐĞĚĞĚďLJĐŽŶǀĞŶƚŝŽŶĂůnjŽŶĞƚĞƐƚƐƚŚĂƚƐŚŽǁĐŽŵƉůŝĂŶƚŐƌŽƵŶĚǁĂƚĞƌŝŶƚŚĞĨŽƌŵĂƚŝŽŶƐ APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ϴ
ƐƵƌƌŽƵŶĚŝŶŐƚŚĞ ƉŝůŽƚ ;ƚĞƐƚŚŽůĞƐͿ ŚŽůĞƐ͍ĨƚĞƌĞǀĂůƵĂƚŝŶŐĐŽŶǀĞŶƚŝŽŶĂůnjŽŶĞƚĞƐƚƌĞƐƵůƚƐĨƌŽŵŚƵŶĚƌĞĚƐŽĨ ďŽƌĞŚŽůĞƐĂŶĚĐŽŵƉĂƌŝŶŐƚŚĞƐĞĚĂƚĂ ƚŽƚŚĞĚĞƚĂŝůĞĚ;
^^dͬh^'^ͿƉƌŽĨŝůŝŶŐƌĞƐƵůƚƐĨƌŽŵƚŚĞĐŽƌƌĞƐƉŽŶĚŝŶŐǁĞůůƐ͕ ƚŚĞĂŶƐǁĞƌďĞĐĂŵĞĐůĞĂƌ͘dŚĞĂŶƐǁĞƌĐŽŶƐŝƐƚƐŽĨĨŽƵƌĐŽŵƉŽŶĞŶƚƐ͗ ϭ͘ ĂƚĂŽĂƌƐŝĨŝĐĂƚŝŽŶ
Ϯ͘ ĂƚĂ>ŽĐĂƚŝŽŶ
ϯ͘ ŽŶƚĂŵŝŶĂŶƚďƵŶĚĂŶĐĞ ĂŶĚ^ƚƌĂƚŝĨŝĐĂƚŝŽŶ
ϰ͘ tĞůůĞƐŝŐŶ
WZKhd/KEt
>>
^/'EE/E^d>>d/KE
ZĞĐĞŶƚĚĞƐŝŐŶĂŶĚŝŶƐƚĂůůĂƚŝŽŶƐŽǀĞƌƚŚĞƉĂƐƚϮLJĞĂƌƐŝŶĐůƵĚĞƚŚĞĨŽůůŽǁŝŶŐ͗ ϭ͘ ^ĂŶŶƚŽŶŝŽtĂƚĞƌŽŵƉĂŶLJ͗,ŝŐŚͲĐĂƉĂĐŝƚLJƐƵƉƉůLJǁĞůůŝŶhƉůĂŶĚ͕͘ZĞƉůĂĐĞŵĞŶƚtĞůůϭϵZ Ϯ͘ &ŽŶƚĂŶĂtĂƚĞƌŽŵƉĂŶLJ͗,ŝŐŚͲĂƉĂĐŝƚLJƐƵƉƉůLJǁĞůůƐŝŶ&ŽŶƚĂŶĂ͕͘tĞůůƐ&ͲϮϭĂŶĚ&ͲϭϬ ͘&ͲϳƐƚĂƌƚƐ
ƚŚŝƐLJĞĂƌ͘
ϯ͘ 
͕^ƚ͘<ŝƚƚƐ͗,ĂƌĚͲZŽĐŬWƌŽĚƵĐƚŝŽŶtĞůů͘
APPENDIX | RESUMES
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES ϵ
WƵďůŝĐĂƚŝŽŶƐ
͘D͘DĂŶƵĐŬ͕E͘,ĞůůĞƌ͕D͘͘ĂƚƚĂŶLJ͕͘WĞƌƌLJ͕͘:͘DĐ ůƌŽŶĞ͕ϮϬϭϮ͘
ǀĂůƵĂƚŝŶŐƚŚĞƉŽƚĞŶƚŝĂůŽĨǁĞůůƉƌŽĨŝůŝŶŐ
ƚĞĐŚŶŽůŽŐLJƚŽůŝŵŝƚŝƌƌŝŐĂƚŝŽŶǁĂƚĞƌƐĂůŝŶŝƚLJŝŶĂůŝĨŽƌŶŝĂǀŝŶĞLJĂƌĚƐ͕ŵĞƌŝĐĂŶ^ŽĐŝĞƚLJŽĨŐƌŝĐƵůƚƵƌĂůĂŶĚŝŽůŽŐŝĐĂů

ŶŐŝŶĞĞƌƐ/^^EϬϴϴϯͲϴϱϰϮ͕ƉƉůŝĞĚ
ŶŐŝŶĞĞƌŝŶŐŝŶŐƌŝĐƵůƚƵƌĞ͕sŽů͘ Ϯϴ;ϱͿ͗ϲϱϳͲϲϲϰ͘
D͘:͘^ŝŶŐůĞƚŽŶ͕Z͘D͘'ĂŝůĞLJ͕:͘
͘DŽƌĂŶ͕D͘͘^ƵƚƚŽŶ͕ E͘,ĞůůĞƌ͕͘<͘
ƐƐĞƌ͕:͘Z͘WŚŝůůŝƉ͘ϮϬϭϭ͘/ĚĞŶƚŝĨLJŝŶŐƚŚĞ
^ŽƵƌĐĞƐŽĨEŝƚƌĂƚĞƚŽĂĞĞƉDƵŶŝĐŝƉĂůtĂƚĞƌ^ƵƉƉůLJtĞůůhƐŝŶŐ^ƚĂďůĞ/ƐŽƚŽƉĞƐŽĨEŝƚƌĂƚĞ͕'ƌŽƵŶĚǁĂƚĞƌŐĞ ĂƚŝŶŐ͕ĂŶĚĞƉƚŚͲ^ƉĞĐŝĨŝĐ^ĂŵƉůŝŶŐ͘'Z͗
ŶǀŝƌŽŶŵĞŶƚĂů&ŽƌĞŶƐŝĐƐŝŶĂŶ
ƌĂŽĨ
ŵĞƌŐŝŶŐŝĂŐŶŽƐƚŝĐDĞƚŚŽĚƐ
/ƌǀŝŶĞ͕͕hŶŝƚĞĚ^ƚĂƚĞƐƉƌŝůϭϮ͕ϮϬϭϭ͕ ƚŚƌŽƵŐŚƉƌŝůϭϮ͕ϮϬϭϭ͘>>E>ͲKE&ͲϰϲϵϭϵϮ͘ N. Heller, 1984. Geology of the Henson Springs Quadrangle, 1984. Master’s dŚĞƐŝƐ͕DŝƐƐŝƐƐŝƉƉŝ^ƚĂƚĞhŶŝǀĞƌƐŝƚLJ E͘,ĞůůĞƌͲ h^WĂƚĞŶƚƐ
ϭϬ͕ϴϬϭ͕ϵϮϴ͗&ůƵŝĚƐĂŵƉůĞĐŽůůĞĐƚŝŽŶƐLJƐƚĞŵĨŽƌƉƵŵƉĞĚĨůƵŝĚƐŽƵƌĐĞ ϭϬ͕ϳϯϴ͕ϲϬϯ͗tĂƚĞƌƐĂŵƉůŝŶŐĂƐƐĞŵďůLJĂŶĚŵĞƚŚŽĚĨŽƌŐƌŽƵŶĚǁĂƚĞƌƉƌŽĚƵĐƚŝŽŶǁĞůůƐĂŶĚďŽƌĞŚŽůĞƐ ϭϬ͕ϲϳϳ͕ϲϮϲ͗&ůŽǁŵĞƚĞƌƉƌŽĨŝůŝŶŐƐLJƐƚĞŵĨŽƌƵƐĞŝŶŐƌŽƵŶĚǁĂƚĞƌƉƌŽĚƵĐƚŝŽŶǁĞůůƐĂŶĚďŽƌĞŚŽůĞƐ ϵ͕Ϯϴϰ͕ϳϮϮ͗^ĞůĞĐƚŝǀĞĞdžƚƌĂĐƚŝŽŶŽĨĨůƵŝĚƐĨƌŽŵƐƵďƐƵƌĨĂĐĞǁĞůůƐ ϴ͕ϭϱϭ͕ϴϳϵ͗ŽŶĞŝƐŽůĂƚŝŽŶĂƐƐĞŵďůLJĂŶĚŵĞƚŚŽĚĨŽƌŝƐŽůĂƚŝŶŐĂĨůƵŝĚnjŽŶĞŝŶĂŶĞdžŝƐƚŝŶŐƐƵďƐƵƌĨĂĐĞǁĞůů ϳ͕ϵϭϴ͕ϮϴϮ͗ŽŶĞĂŶĚŝƐŽůĂƚŝŽŶĂƐƐĞŵďůLJĂŶĚŵĞƚŚŽĚĨŽƌŝƐŽůĂƚŝŶŐĂƉůƵƌĂůŝƚLJŽĨĨůƵŝĚnjŽŶĞƐŝŶĂƐƵďƐƵƌĨĂĐĞǁĞůů ϳ͕ϲϱϱ͕ϱϯϰ͗ŽŶĞĂŶĚŝƐŽůĂƚŝŽŶĂƐƐĞŵďůLJĨŽƌŝƐŽůĂƚŝŶŐĂŶĚƚĞƐƚŝŶŐĨůƵŝĚƐĂŵƉůĞƐĨƌŽŵĂƐƵďƐƵƌĨĂĐĞǁĞůů ϳ͕ϲϯϭ͕ϲϵϲ͗ŽŶĞŝƐŽůĂƚŝŽŶĂƐƐĞŵďůLJĂƌƌĂLJĨŽƌŝƐŽůĂƚŝŶŐĂƉůƵƌĂůŝƚLJŽĨĨůƵŝĚƐnjŽŶĞƐŝŶĂƐƵďƐƵƌĨĂĐĞǁĞůů ϳ͕ϱϱϲ͕Ϭϵϳ͗ŽĐŬŝŶŐƌĞĐĞŝǀĞƌŽĨĂnjŽŶĞŝƐŽůĂƚŝŽŶĂƐƐĞŵďůLJĨŽƌĂƐƵďƐƵƌĨĂĐĞǁĞůů ϳ͕ϰϵϯ͕ϵϱϰ͗^LJƐƚĞŵƐĂŶĚŵĞƚŚŽĚƐĨŽƌŝŶƐƚĂůůĂƚŝŽŶ͕ĚĞƐŝŐŶĂŶĚŽƉĞƌĂƚŝŽŶŽĨŐƌŽƵŶĚǁĂƚĞƌŵŽŶŝƚŽƌŝŶŐƐLJƐƚĞŵƐŝŶ ďŽƌĞŚŽůĞƐ
ϲ͕Ϭϯϱ͕ϵϱϬ͗ DĞƚŚŽĚĂŶĚĂƉƉĂƌĂƚƵƐĨŽƌĨůƵŝĚĂŶĚƐŽŝůƐĂŵƉůŝŶŐ ϲ͕ϬϬϬ͕ϰϴϭ͗DĞƚŚŽĚĂŶĚĂƉƉĂƌĂƚƵƐĨŽƌĞŶǀŝƌŽŶŵĞŶƚĂůƐĂŵƉůŝŶŐ ϱ͕ϵϳϵ͕ϱϲϵ͗DĞƚŚŽĚĂŶĚĂƉƉĂƌĂƚƵƐĨŽƌĞŶǀŝƌŽŶŵĞŶƚĂůƐĂŵƉůŝŶŐ ϱ͕ϴϴϰ͕ϳϭϰ͗DĞƚŚŽĚĂŶĚĂƉƉĂƌĂƚƵƐĨŽƌĨůƵŝĚĂŶĚƐŽŝůƐĂŵƉůŝŶŐ C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES APPENDIX 3

AFFIDAVIT OF

NON-COLLUSION
AFFIDAVIT OF NON-COLLUSION // 40
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES March 2013

AFFIDAVIT OF NON-COLLUSION BY CONTRACTOR

STATE OF CALIFORNIA )
) ss

COUNTY OF LOS ANGELES )
_______________________________________________________________, being first duly sworn deposes and says that he/she is ______________________________________________________________________ (Insert "Sole Owner", "Partner", "President, "Secretary", or other proper title) of______________________________________________________________________________________ (Insert name of bidder)
who submits herewith to the City of Vernon a bid/proposal; That all statements of fact in such bid/proposal are true; That such bid/proposal was not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; That such bid/proposal is genuine and not collusive or sham; That said bidder has not, directly or indirectly by agreement, communication or conference with anyone attempted to induce action prejudicial to the interest of the City of Vernon, or of any other bidder or anyone else interested in the proposed contract; and further That prior to the public opening and reading of bids/proposals, said bidder:
a. Did not directly or indirectly, induce or solicit anyone else to submit a false or sham bid/proposal;
b. Did not directly or indirectly, collude, conspire, connive or agree with anyone else that said bidder or anyone else would submit a false or sham bid/proposal, or that anyone should refrain from bidding or withdraw his/her bid/proposal;
c. Did not, in any manner, directly or indirectly seek by agreement, communication or conference with anyone to raise or fix the bid/proposal price of said bidder or of anyone else, or to raise or fix any overhead, profit or cost element of his/her bid/proposal price, or of that of anyone else; d. Did not, directly or indirectly, submit his/her bid/proposal price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any individual or group of individuals, except the City of Vernon, or to any person or persons who have a partnership or other financial interest with said bidder in his/her business.

I certify under penalty of perjury that the above information is correct By:______________________________________ Title:________________________________ Date:____________________________________
Duncan Lee, PE
Vice President - Utilities Division
Pacific Advanced Civil Engineering, Inc. (PACE)
Duncan Lee, PE Vice President - Utilities Division
10/24/24
C361 // CITY OF VERNON SOURCE WATER QUALITY ASSESSMENT AND DESIGN OF TREATMENT FACILITIES APPENDIX 4

WORK PRODUCT

EXAMPLES
TITLE SHEET G0.0
1 APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36.dwg; B789-Aerial Overall.dwg; B789_NC WELLS NO 4 As built.dwg; B789-07-Site PlanC.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07-G0.0.dwg - Tab: G0.0 - by jezell on 07/16/24 at 3:03:55 PM Dimscale = 20; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 OR
MOK . T WERDNA

I F SSE A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2 SWEETWATER AUTHORITY CHULA VISTA, CA 91910 505 GARRETT AVE. OWNER: CONTACT: ERICK DEL BOSQUE, PE (619) 409-6750 (714) 481-7300 17520 NEWHOPE STREET, SUITE 200 CIVIL ENGINEER: CONTACT: ANDREW T. KOMOR, P.E. PACIFIC ADVANCED CIVIL ENGINEERING, INC. FOUNTAIN VALLEY, CA 92708 PROJECT CONTACTS:

T H
O

T UA WS
E
RI
YT RE
WAT VICINITY MAP N.T.S. ACCESS ROAD
I-805
"R" AVE. DIVISION ST.
"U" AVE FOURTH ST. PROJECT LOCATION NATIONAL CITY WELLS EL TOYON ELEM. SCHOOL SITE INFORMATION: 475 GODDARD #200 GEOTECHNICAL ENGINEER: CONTACT: JEFFREY T. KENT, PE NINYO & MOORE IRVINE, CA 92618 (949) 753-7070 BASIS OF COORDINATES CCS 83, ZONE 6, 1991.35 EPOCH BASED ON ROS 14492 CITY OF NATIONAL CITY BENCHMARK AT THE NORTHWEST CORNER OF FIRST STREET AND EUCLID AVENUE, BENCHMARK & BASIS OF BEARING INFORMATION PROPOSED SITE AREA: OCCUPANCY GROUP: PROPOSED BUILDING AREA: BRASS PLUG IN CURB ALONG EUCLID AVENUE, NGVD 29 DATUM-ELEVATION 116.91 DEFERRED SUBMITTAL ITEMS UNDERGROUND PRECAST CONCRETE STRUCTURES PACKAGED BOOSTER PUMP SKID 100,000 USG WELDED STEEL WATER STORAGE TANK 10' DIA. STEEL FILTER VESSELS SEISMIC ANCHORING OF MECHANICAL EQUIPMENT IBC TYPE: +/- 10,000 SQ. FT. U520 SQ. FT. V-B FINISHED FLOOR ELEVATION: +/- 85.0' MSL APPROVED BY: SWEETWATER AUTHORITY ERICK DEL BOSQUE, PE DIRECTOR OF ENGINEERING DATE Sheet List Table Sheet Number Sheet Title GENERAL G0.0 TITLE SHEET G2.0 GENERAL NOTES G3.0 HYDRAULIC PROFILE G4.0 BORE LOGS CIVIL C0.0 EXISTING SITE SURVEY C1.0 TREATMENT SYSTEM SITE PLAN C1.1 GRADE PLAN C2.0 YARD PIPING PLAN C3.0 CIVIL DETAILS MECHANICAL M0.0 EQUIPMENT LIST M1.0 PS MECH PLAN M2.0 FILTERS MECHANICAL PLAN M2.1 FILTERS SECTIONS M3.0 BW TANK PLAN M3.1 BW TANK SECTIONS M3.2 BW TANK DETAILS M4.0 BYPASS PIPING PLAN M4.1 BYPASS PIPING ISO & SECTION M5.0 PIPE SUPPORT DETAILS M5.1 MECH DETAILS I M5.2 MECH DETAILS II STRUCTURAL S0.1 GENERAL STRUCTURAL NOTES S0.2 GENERAL STRUCTURAL NOTES (CONT.) S0.5 TYPICAL DETAILS S3.1 FOUNDATION DETAILS ELECTRICAL E0.0 ELECTRICAL GENERAL NOTES E0.1 ELECTRICAL LEGEND & ABBREVIATIONS E1.0 EXISTING MCC SINGLE LINE DIAGRAM E1.1 SINGLE LINE DIAGRAM E1.2 PANEL SCHEDULE AND LOAD SUMMARY E2.0 FIELD SITE PLAN E2.1 ELECTRICAL GROUNDING SITE PLAN E3.0 ELECTRICAL POWER PLAN PUMP STATION E3.1 ELECTRICAL CONTROL PLAN PUMP STATION E3.2 ELECTRICAL ROOM & PUMP STATION LIGHTING PLAN E3.3 POWER PLAN FILTERS AREA E3.4 CONTROL PLAN FILTERS AREA E3.5 BACKWASH TANK ELEVATION PLAN E5.0 POWER CABLE AND CONDUIT SCHEDULE 1 E5.1 POWER CABLE AND CONDUIT SCHEDULE 2 E5.2 CONTROL CABLE & CONDUIT SCHEDULE E6.0 ELECTRICAL DETAILS I E6.1 ELECTRICAL DETAILS II E6.2 ELECTRICAL DETAILS III E6.3 ELECTRICAL DETAILS IV E6.4 ELECTRICAL DETAILS V E7.1 ELEMENTARY CONTROL DIAGRAM II E7.2 ELEMENTARY CONTROL DIAGRAM III E8.0 TITLE 24 ELECTRICAL POWER DISTRIBUTION FORM E8.1 TITLE 24 INDOOR LIGHTING FORM I E8.2 TITLE 24 INDOOR LIGHTING FORM II E8.3 TITLE 24 OUTDOOR LIGHTING FORM I E8.4 TITLE 24 OUTDOOR LIGHTING FORM II P&ID I0.0 LEGEND & SYMBOLS P&ID I0.1 NETWORK DIAGRAM P&ID I1.0 FILTER BOOSTER PUMP SKID P&ID I2.0 FILTERS I I2.1 FILTERS II I3.0 FILTERS III I3.1 FILTERS IV I6.0 BACKWASH TANK P&ID HYDRAULIC PROFILE HIGH PRESS HYDRAULIC GRADE LINE LEGEND LOW PRESS LWL HWL G3.0 APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 - Hydraulic Profile.dwg; B789-07 24x36.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 G3.0 HYDRAULIC PROFILE.dwg - Tab: G30 - by jezell on 07/16/24 at 3:07:06 PM Dimscale = 1; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech) ; Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2 BYPASS HEADLOSS @ 1400 GPM RUN PIPE SIZE (IN) MATERIAL C FACTOR PIPE LENGTH (FT) EQUIVALENT LENGTH (FT) LOSS (FT) SUCTION 12 C900 140 360 282 1.5 RETURN 12 C900 140 595 825.5 4.5 PUMP SKID - - - - - 11.5 FILTER (MIN) - - - - - 11.5 FILTER (MAX) - - - - - 34.5 EXISTING 12" W EXISTING 8" W NC WELLS DEPTH CHARTS WELL NO 3 GROUND SURFACE EL 89.5 FT MSL BOWL DEPTH 240 FT BS AVE WATER DEPTH (PUMP ON) 233.23 FT BS AVE WATER DEPTH (PUMP OFF) 185.00 FT BS AVE DRAWDOWN 48.23 FT NC WELLS DEPTH CHARTS WELL NO 4 GROUND SURFACE EL 82.5 FT MSL BOWL DEPTH 260 FT BS AVE WATER DEPTH (PUMP ON) 193.98 FT BS AVE WATER DEPTH (PUMP OFF) 132.11 FT BS AVE DRAW DOWN 61.87 FT 3 W
W
W
W
W
W
W
W
W
W
W
W
W
B1
B2
P1
P2
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SD
W
W
W
SD
SD
SD
SD
SD
SD
SD

SD SS SS SS SS SS

SD SD SD SD

SD SD SD SD
YARD PIPING PLAN C2.0
8 APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36.dwg; B789-07 - Mech Sections.dwg; B789-07 - SITE PLAN.dwg; National City Wells Parcels.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 YARD PIPING PLAN.dwg - Tab: C2.0 - by jezell on 07/16/24 at 3:11:47 PM Dimscale = 10; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2 SCALE: 1" = 8' - 0" PLAN VIEW
6CONSTRUCTION NOTES: 325891047 11 CIVIL LEGEND: CONCRETE WALK PERIMETER FENCE 1 X X X X 1 AC PAVEMENT CRUSHED ROCK RIGHT-OF-WAY OR PROPERTY LINE CONSTRUCTION NOTES SURVEY CONTROL POINTS EXISTING GRADE CONTOUR INSTALL 6" Ø CL350 DIP CONSTRUCT 6' Ø PRECAST CONCRETE WET WELL INSTALL 2.5" Ø SCH 80 PVC PIPE AND FITTINGS INSTALL 4" Ø CL350 DIP INSTALL 4" Ø SCH 80 PVC INSTALL 2" Ø SCH10 SS PIPE AND FITTINGS INSTALL 8" Ø CL350 DIP INSTALL 12" Ø C900 PVC PIPE INSTALL 12" Ø CL350 DIP CONSTRUCT 2' DP. TYPE-F PRECAST CONCRETE CATCH BASIN PER SDRSD D-07 9 5
1 INSTALL 12" Ø SDR 35 PVC PIPE 10
4 3
3 4
2 2
9 2 12 CONSTRUCT 4' DP. TYPE-G PRECAST CONCRETE CATCH BASIN PER SDRSD D-08 W/ FRAME AND GRATE 12 7 IE ± 81.5 T.O. CB ± 83.5 NOTES: 1. ALL ABOVE GROUND DUCTILE IRON PIPES SHALL BE CL350 AND COATED PER SPECIFICATIONS. CONNECTIONS SHALL BE FLANGED 2. ALL BURIED DUCTILE IRON PIPES SHALL BE CL350 AND COATED PER SPECIFICATIONS, POLYETHYLENE ENCASED PER AWWA C105 AND SHALL BE JOINED BY RESTRAINED MECHANICAL JOINT TYPE FITTINGS. 3. ALL SEWER CROSSINGS SHALL MAINTAIN 2' MINIMUM CLEARANCE BENEATH WATER MAINS ± 300 LF ± 100 LF ± 40 LF ±120 LF ±20 LF ± 350 LF± 350 LF ± 100 LF ± 40 LF ± 100 LF ±80 LF ±80 LF 13 INSTALL CLEANOUT PER MECHANICAL DETAIL 14 BACKFILL TRENCH WITH 2 SACK SLURRY CONCRETE MIX PER SDRSD STANDARD DRAWING SDS-112 15 INSTALL 1" COPPER TUBING FOR WATER SERVICE 2 ± 100 LF 16 DEMO AND REMOVE EXISTING RIP RAP CULVERT AND 12" PVC DRAIN PIPE 16 16 IE ± 81.25 IE ± 81.0 TOW ± 82.0 1 ± 40 LF ± 60 LF 1 17 EXTEND EXISTING DRAINAGE SWALE, SEE CIVIL DETAIL 17 IE ± 80.5 FG ± 80.5 PROPOSED GRADE CONTOUR 18 CONSTRUCT STORM DRAIN OUTFALL PER SDRSD DWGS D-30 HEADWALL, AND D-40 RIP RAP ENERGY DISSIPATER 18 19 INSTALL 3" Ø CL350 DIP RAW WATER FROM WELLS FILTRATE TO CT TANK RAW WATER FROM WELL NO 4 SS FM TO SS MH
2 IE ± 81 IE ± 78 IE ± 81 IE ± 81 IE ± 81 IE ± 81 IE ± 81 IE ± 83' IE ± 78 ###

FILTERS MECHANICAL
PLAN
APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 - Mech FilterTank.dwg; B789-07 24x36.dwg; B789-07 - Mech FilterTank 3D je.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-M2.0 FILTERS PLAN & ISO.dwg - Tab: M20 - by jezell on 07/16/24 at 4:24:37 PM Dimscale = 48; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2 M2.0 12 105 CONSTRUCTION NOTES: 102 INSTALL FILTER POWER AND CONTROLS PULL BOX, SEE ELEC 101 INSTALL 10' Ø WELDED STEEL FILTER VESSELS, SEE SPECS 107 108 109 103 INSTALL FOUNDATION SLAB ON GRADE PER STRUCTURAL PLANS 104 110 111 NOT USED INSTALL 8" Ø SCH 10 SS PIPE AND FITTINGS NOT USED NOTES: 1. FILTER VESSELS SHALL BE DESIGNED, MANUFACTURED AND CONSTRUCTED PER ASME PRESSURE VESSEL CODE. SHOP DRAWINGS SHALL BE STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF CALIFORNIA 2. CONTRACTOR SHALL PROVIDE LABELS ON FACE OF FILTERS. UV RESISTANT 6" LETTERING 3. ALL PIPE SUPPORTS SHALL BE SS AND INSTALLED PER MECHANICAL DETAILS ON SHEET M5.0. 4. INSULATING FLANGE KIT SHALL BE PROVIDED WHEN TRANSITIONING BETWEEN DISSIMILAR METAL PIPES INSTALL 12" Ø SCH 10 SS PIPE AND FITTINGS INSTALL 8" MAGNETIC FLOW METER, SEE SPECS INSTALL 8" MILLIKEN 100% PORT, 3-WAY PLUG VALVE W/ SINGLE PHASE, 175 PSI RATED ELECTRIC ACTUATOR OR EQUAL 112 INSTALL 8" SS ROTORK BALL VALVE WITH ELECTRIC ACTUATOR PER SPECS INSTALL 4" SCH 80 PVC PIPE AND FITTINGS W/ 2" ISOLATION BALL VALVE 113 114 115 INSTALL 8" LUGGED STYLE BFV W/ ACTUATOR PER SPECS (FLG) INSTALL 8" SS ROTORK BALL VALVE WITH ELECTRIC ACTUATOR PER SPECS INSTALL 2" AIR VAC & RELEASE VALVE ASSEMBLY PER MECHANICAL DETAIL. ROUTE DISCHARGE TO 4" SCH 80 PVC DRAIN BELOW.

DM5.2 116 INSTALL PRESSURE GAUGE AND TRANSMITTER ASSEMBLY PER MECHANICAL DETAIL BM5.1 SCALE: 1" = 4' - 0" PLAN VIEW SCALE: NTS 3D CONCEPT VIEW 117 INSTALL 12" RIGID STYLE 807 VICTAULIC COUPLING FOR POTABLE WATER 118 INSTALL 12" STYLE 307 VICTAULIC TRANSITION COUPLING 120 INSTALL 12" PIPE SUPPORT PER DETAIL 121 INSTALL SAMPLING STATION PER MECHANICAL DETAILS S9 M5.0 EM5.2 119 INSTALL 8" RIGID STYLE 807 VICTAULIC COUPLING FOR POTABLE WATER 102 101 105 109 103 104 110 111 112 110 115 116 117 118 101 101 101 103 121 102 102 102 105 105 105 1057 105 110 111 110 111 112 112 104 104 101 101 101 101 110 115 115 115 110 111 111 110 110 111 111 110 117 117 118 110 110 110 110 16'-0" 12' - 6" 16'-0" 58' - 0" 12' - 6" 113 113 113 12" RAW WATER FROM WELLS 12" FILTRATE TO CT TANK 8" BACWASH TO TANK BM1.2 102 101 103 104 108 109 ### ### ### 113 115 117 119 120 102 ### 101 101 102 102 104 104 105 ### 105 102 102 102 105 105 105 105 110 ### 110 105 105 111 ### 111 111 112 ### 112 112 115 115 115 115 117 119 119 120 120 120 103 110 110 118 113 113 113 104 104 ± 1'-0"
± 10"
± 1'-0" ELEC CONDUIT BANK SEE E-SHEETS SCALE: 1" = 4' - 0" WEST ELEVATION SCALE: 1" = 4' - 0" SECTION A AM1.2
1'-0"1'-6"1'-0"
± 1'-10"
±16'-0" 121 121 121 102 102 102 102 105 119 105 119 105 119 105 105

FILTERS SECTIONS
APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 - Mech FilterTank.dwg; B789-07 24x36.dwg; B789-07 - Mech FilterTank 3D je.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-M2.1 FILTERS SECTIONS.dwg - Tab: M21 - by jezell on 07/16/24 at 4:22:39 PM Dimscale = 48; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2 8" BACKWASH HEADER M2.1 13 105 CONSTRUCTION NOTES: 102 INSTALL FILTER POWER AND CONTROLS PULL BOX, SEE ELECTRICAL PLANS 101 INSTALL 10' Ø WELDED STEEL FILTER VESSELS, SEE SPECS 107 108 109 103 CONSTRUCT FILTER FOUNDATION SLAB ON GRADE PER STRUCTURAL PLAN 104 110 111 NOT USED INSTALL 8" Ø SCH 10 SS PIPE AND FITTINGS INSTALL 4" Ø SCH 80 PVC PIPING NOTES: 1. ALL ABOVE GROUND DUCTILE IRON PIPES SHALL BE CL350 AND COATED PER SPECIFICATIONS. CONNECTIONS SHALL BE FLANGED 2. ALL BURIED D.I. PIPES SHALL BE CL350 AND COATED PER SPECIFICATIONS AND SHALL BE JOINED BY RESTRAINED MECHANICAL JOINT TYPE FITTINGS 3. ALL SS PIPING SHALL BE SCH 10 AND JOINED BY GROOVED STYLE COUPLINGS UNLESS SPECIFIED OTHERWISE ON THE PLANS. CONTRACTOR SHALL FOLLOW MFR RECOMMENDATIONS FOR PREPARING SCH 10 PIPE ENDS 4. ALL PIPE SUPPORTS SHALL BE SS AND INSTALLED PER MECHANICAL DETAILS ON SHEET M5.0 5. ALL WALL PENETRATIONS SHALL BE INSTALLED PER MECHANICAL DETAIL A ON SHEET M5.1 6. PROVIDE THRUST BLOCKS AS REQUIRED PER CIVIL DETAIL D SHEET C3.0 INSTALL 12" Ø SCH 10 SS PIPE AND FITTINGS INSTALL 8" MAGNETIC FLOW METER PER SPECS AND EQUIP LIST INSTALL 8" MILLIKEN 100% PORT, 3-WAY PLUG VALVE W/ SINGLE PHASE, 175 PSI RATED ELECTRIC ACTUATOR 112 INSTALL 8" SS BALL VALVE WITH ELECTRIC ACTUATOR PER SPECS (FLG) INSTALL 2" SCH 80 PVC DRAIN PIPE AND FITTINGS W/ 2" ISOLATION BALL VALVE 113 114 115 INSTALL 8" LUGGED STYLE BFV (FLG) INSTALL 8" LUGGED STYLE BFV W/ ELECTRIC ACTUATOR PER SPECS (FLG) INSTALL 2" AIR VAC & RELEASE VALVE ASSEMBLY PER MECHANICAL DETAILDM5.2 116 INSTALL PRESSURE GAUGE AND TRANSDUCER ASSEMBLY PER MECHANICAL DETAIL BM5.1 117 INSTALL 12" RIGID STYLE 807 VICTAULIC COUPLING FOR POTABLE WATER 119 INSTALL 6" RIGID STYLE 807 VICTAULIC COUPLING FOR POTABLE WATER 120 INSTALL 12" S95 PIPE SUPPORT PER DETAIL S9 M5.0 121 INSTALL SAMPLING STATION PER MECH DETAILEM5.2 116 103 104 104 104 104 104 104 108 110 110 117 118 INSTALL STYLE 307 VICTAULIC IPS TO AWWA DIP TRANSITION COUPLING 118 110 110 109 110 110 109 113 113 113 113 118 ± 2'-10" ± 4'-0" SCALE: 1" = 2' - 0" SECTION B ± 4'-5" ± 2'-8" ± 4'-5" ± 7" 8" BACKWASH TO BW TANK 12" FILTRATE TO CT TANK 12" RAW FROM PUMPS 2" DRAIN 122 INSTALL AERATION PIPING PER DETAIL FM5.2 ± 8'-6" ± 3'-5" ± 3'-5"
± 1'-6" ± 1'-6" SCALE: NTS FILTER FEED HEADER ISOMETRIC VIEW FILTRATE 8" INFLUENT 8" INFLUENT FILTRATE 8" BACKWASH 12" FILTRATE 12" INFLUENT 110 110 110 114 114 113 12" RETURN PIPE 12" FEED PIPE 118 (TYP.) (TYP.) NOTE: FILTERS NOT SHOWN FOR CLARITY 117 117 117 111 111 105 105 105 105 E1.1
29 PANEL SCHEDULE & LOAD SUMMARY

DISTRIBUTION (PANEL-B)
480V, 225A, 65kAIC, 3Ø, 3W, 60HZ, NEMA 12
3P
SPD
GND
CONSTRUCTION NOTES:
6 THE PANEL SHALL BE EQUIPPED WITH SURGE PROTECTIVE DEVICE 100KVA PER PHASE INSTALLED AND TESTED BY THE PANEL VENDOR.
7 4
2 20

BOOSTER
PUMP #1
NORTH
(PMP-1911)
(27 FLA)
65 KAIC
NOTES:

1. DRAWINGS ARE DIAGRAMMATIC AND DO NOT REFLECT ACTUAL ROUTING.

CONTRACTOR SHALL INSTALL PULLPOINTS WHERE REQUIRED FOR
PULLING TENSION AND MAINTAINING LESS THEN (4) 90 DEGREE BENDS.

2. IN ACCORDANCE WITH NEC 110.16(A), ELECTRICAL EQUIPMENT SUCH AS

MCC, PANELBOARDS, VFDS & RVSS SHALL HAVE FIELD OR FACTORY LABELS WARNING PERSONNEL OF ARC FLASH HAZARDS.

3. MOTORS POWERED FROM AN ASD/VFD SHALL HAVE OVERTEMPERATURE PROTECTION PER NEC 430.126 IF THE MOTOR IS NOT INVERTER-DUTY TYPE.

4. GROUND AND BOND ALL ENCLOSURES PER GROUNDING PLANS AND MANUFACTURER/CODE REQUIREMENTS.

5. NOT ALL EQUIPMENT AND WIRING IS SHOWN ON THIS DIAGRAM.

REFERENCE DRAWINGS IN THE ELECTRICAL SET AND ENTIRE PROJECT TO COMPLETELY UNDERSTAND THE SCOPE OF ELECTRICAL WORK.

6. ALL 480V CIRCUIT BREAKERS SHALL BE RATED FOR A MINIMUM INTERRUPTING RATING OF 65,000 AMPS.

BOND EQUIPMENT/ENCLOSURE WITH #4/0 BARE COPPER GROUND
TO SYSTEM GROUNDING RING. THE BOND SHALL BE EXOTHERMIC WELD, MIN 30'' BELOW GROUND
5 BOOSTER
PUMP #2
CENTER
(PMP-1912)
(27 FLA)
5 BOOSTER
PUMP #3
SOUTH
(PMP-1913)
(27 FLA)
20 DECANT

BACKWASH
PUMP #4
(PMP-1914)
(7.6 FLA)
P101A
VARIABLE FREQUENCY DRIVE IN NEMA 12 ENCLOSURES EQUIPPED WITH 3% LINE

REACTORS, ETHERNET CARD AND BREAKER/FUSES BASED ONE THE MANUFACTURER'S RECOMMENDATIONS.
225A
3P APP. DATE BY DATE NO
JOB NO. B789-07
OF 61 SHEETS JOBSWEETWATER AUTHORITY REVISIONS TITLE 06-30-2025 -- PROJECT ENGINEER PREPARED BY BASHAR ISHAQ R.C.E. NO. EXP. DRAWN R.S. DESIGNED R.S. CHECKED BI #C64928 SCALE OCT 2023 DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION". THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36 Elect.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 E1.1.dwg - Tab: E1.1 - by jezell on 07/16/24 at 4:53:10 PM Dimscale = 10; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech) ; Visretain = 1 100% ISSUED FOR BID #2 P100A
SLUDGE

DISCHARGE
PUMP #5
(PMP-3112)
(7.6 FLA)
20 15A
3P
MAIN CIRCUIT BREAKER 600V, 225A, 100% RATED, 3-POLE ADJUSTABLE BOLT ON TYPE, PROVIDED BY THE PANEL VENDOR/MANUFACTURER.
3 XFMR-C
30 KVA,
480-120/208V,
3Ø-4W
#2

PANEL 'C'
120/208V,
3Ø-4W,
100A MAIN,
42 CKTS.
60A
3P

SINGLE LINE DIAGRAM
1 3
2 4
5 60A
3P
VFD
60A
3P
VFD
5 60A
3P
VFD
15A
3P
VFD
5 5 5
P102A P103A P104A
P100B P101B P102B P103B
VFD
5 F F F F F
P100 P101 P102 P103 P104
P104B
20 SLUDGE
MIXING
PUMP #6
(PMP-3111)
(27 FLA)
60A
3P
P105A
VFD
5 F
P105
P105B
40A
3P
7 PANEL "D" MINI POWER CENTER 15KVA, 3PH, 480V-208Y/120V, PRIMARY PROTECTION SHALL BE 40A & SECONDARY PROTECTION DEVICE SHALL BE 50A.

NEMA 4X, EATON CATALOG NO. P48G28T1524HCUBS64X OR APPROVED EQUAL.

FED FROM EXISTING WELL
MCC. SEE SHEET E1.0
P110B
P110A P200
P200B
PANEL "D"
120/208V,
3Ø, 4W,
24 CKTS.

XFMR-D
15 KVA,
480-120/208V,
3Ø-4W
POWER WIRE WAY #2
1 NEW DISTRIBUTION PANEL B, 225A 100% RATED MAIN BREAKER, 65kAIC, 42 CKT, EATON PRL1X CATALOG NO. EZB2048R. L: 48" W: 20" D:5.75" OR APPROVED EQUAL. SPARES ARE NOT SHOWN.
6 PANEL "C" 100A, 208V, 27 CKT, EATON PRL1X H: 48" W: 20" D: 5.75" WALL MTD.

CATALOG NO. EZB2048R OR APPROVED EQUAL.

P001
F
8 FUSED DISCONNECT SWITCH 600V, 60A, NEMA 4X, 3 POLE, HEAVY DUTY. 8 POWER WIRE WAY #1
P100E P101E P102E P103E P104E P105E

DUCT BANK
P200A
U.G POWER
PULLBOX #1
9 9
10 9 CONTRACTOR TO SIZE AND PROVIDE WIREWAYS AS SHOWN ON SHEET E6.4 LOCATED IN THE ELECTRICAL ROOM.
10 DUCT BANK TO BE INSTALLED BETWEEN THE ELECTRICAL ROOM AND THE PUMP ROOM PER SHEET E6.1, DETAIL D
#4/0 GND
P101D
P100D
P102D
P103D
P105D
P104D
J-BOX P-1
P100C P101C P102C P103C P104C P105C

LIQUID-TIGHT

FLEXIBLE

CONDUIT
SD
SD
SD
SD
SD
SD AIR
E2.1
32 APP. DATE BY DATE NO
JOB NO. B789-07
OF 61 SHEETS JOBSWEETWATER AUTHORITY REVISIONS TITLE 06-30-2025 -- PROJECT ENGINEER PREPARED BY BASHAR ISHAQ R.C.E. NO. EXP. DRAWN R.S. DESIGNED R.S. CHECKED BI #C64928 SCALE OCT 2023 DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION". THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET
Xrefs: B789-07 24x36 Elect.dwg; National City Wells Parcels.dwg; B789-07 - SITE PLAN.dwg; B789_NC WELLS NO 4 As built.dwg; B789-07 - Elec backgrounds.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 E2.1 ELECTRICAL GROUNDING SITE PLAN.dwg - Tab: ELECTRICAL GROUNDING SITE PLAN - by jezell on 07/16/24 at 4:02:27 PM Dimscale = 24; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 100% ISSUED FOR BID #2

ELECTRICAL GROUNDING SITE PLAN ELECTRICAL GROUNDING SITE PLAN CONSTRUCTION NOTES:

EXOTHERMIC WELD PER DET "D" ON E6.0.
#4/0 BARE GROUND RING, MINIMUM 30" BELOW GRADE.

GROUND INSPECTION ROD PER DET "E" ON E6.0.

GROUND ROD PER DET "A" ON E6.0.

GROUND TO EQUIPMENT STRUCTURE PER DET "J" ON E6.0.

GROUND TO REBAR PER DET "H" ON E6.0.
#2 INSULATED COPPER, GROUNDING ELECTRODE CONDUCTOR PROTECTED IN 1" SCH 80 PVC WHERE EXPOSED.

GROUND TO GATE/FENCE PER DET "C" ON E6.0.

ACTUATOR VALVE SHALL BE GROUNDED.

LEGEND: NOTES:

1. GROUND FLOW METER PER DETAIL 'B' ON E6.0

2. GROUND AND BOND ALL EQUIPMENT AND ENCLOSURES PER MANUFACTURER REQUIREMENTS AND NEC 250.

3. ALL METALLIC PIECES INCLUDING RAILINGS, DOORS, EQUIPT SKIDS, OR OTHER METAL PERSONNEL MAY COME IN CONTACT WITH, SHALL BE EFFECTIVELY GROUNDED.

4. GROUNDING ROUTING IS DIAGRAMMATIC.
10 0 10 20
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)

BARE COPPER GROUND RING (TYP)

BARE COPPER GROUNDING ELECTRODE CONDUCTOR (TYP)
REFER TO DETAIL "E" ON E6.0
REFER TO DETAIL "A" ON E6.0
#2
#4/0
P.B.

COMM.

U.G. P.B.
(TYP)
11 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
SCALE: 1' = 10' 1
XFMR-C, 30 KVA, 480-208/120V, 3Ø-4W, NEMA 12, PAD MTD.

NEW DISTRIBUTION PANEL B, 225A, 42 CKT, EATON PRL1X CATALOG NO.

EZB2048R. L: 48" W: 20" D:5.75" OR APPROVED EQUAL.

LIGHTING CONTROL PANEL "LCP-B", IN MCC, WIRED PER SHEET E3.2 15 16
"RIO" PANEL WALL MTD PER UL805A
A/C UNIT SPLIT SYSYTEM 3-TON, 208V, 1PH. REFER TO MECH LIST DWG M0.0. 18 14
10 THE FOUNDATIONS TO BE CONCRETE - ENCASED 'UFER' GROUNDED PER E6.1 DETAIL 'A'
GROUND U.G. PULLBOX PER E6.3 DETAIL 'A'
INSTALL GROUND BAR PER E6.1 DETAIL 'B'

PANEL 'C'
18 2
1 9
6 11
18 18
5 9
3 2
8 12
4 10 10 10 10
7 13
10 10
17 18

POWER PLAN FILTERS AREA
E3.3
36 SCALE: 1/4" = 1' - 0"

FILTER AREA POWER PLAN
SCALE: 1/4" = 1' - 0"

FILTER ELEVATION (LOOKING EAST)

REFER TO FILTER ELEVATION
BELOW, THIS DWG. APP. DATE BY DATE NO
JOB NO. B789-07
OF 61 SHEETS JOBSWEETWATER AUTHORITY REVISIONS TITLE 06-30-2025 -- PROJECT ENGINEER PREPARED BY BASHAR ISHAQ R.C.E. NO. EXP. DRAWN R.S. DESIGNED R.S. CHECKED BI #C64928 SCALE OCT 2023 DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION". THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 - Mech FilterTank Elec.dwg; B789-07 24x36 Elect.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 E3.3.dwg - Tab: E3.3 - by jezell on 07/16/24 at 3:57:38 PM Dimscale = 48; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 100% ISSUED FOR BID #2 CONSTRUCTION NOTES:
2 3
4 5
6 7
8 NOTES:

1. LABEL CONDUITS PER DETAIL "F" SHEET E6.0

2. CONDUIT ROUTING IS SHOWN DIAGRAMMATIC.

3. REFER TO FILTER VENDOR MFR DRAWING TO FLOW METER AND MOV'S PER FILTER #1, #2, #3, and #4.

4. REFER TO MECH. DRAWING M2.0 FOR FILTER SKID EQUIPMENT.

5. REFER TO P&ID DRAWINGS I2.0 AND I3.0.

6. PROVIDE NAMEPLATES FOR ALL DEVICES.
1 4 4 4
4 PER FILTER MFR. AND
SHALL BE U.L. 508A.

NEMA 4X.

NEMA 4X PANEL PULLBOX DETAIL

NOT TO SCALE
MINI POWER CENTER FUSED DISCONNECT.

FLOW METER. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST.

MOV 3-WAY PLUG BACKWASH VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST. EQUIPPED WITH INTEGRATED LOCKABLE DISCONNECT MOV 3-WAY PLUG FILTER TO DRAIN VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST. EQUIPPED WITH INTEGRATED LOCKABLE DISCONNECT MOV BALL THROTTLING VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST. EQUIPPED WITH INTEGRATED LOCKABLE DISCONNECT ALL FINAL CONNECTIONS TO DEVICES WITH MIN. 3 FT LFMC, REDUCERS AND FITTINGS

NOT USED
JUNCTION BOX/ PULL BOX MOUNTING DETAIL "C" ON E6.3.

INCOMING MINI POWER
CENTER. POWER SOURCE TO DEVICES

FILTER INSTRUMENTATION CHART
CHART CN FILTER #1 FILTER #2 FILTER #3 FILTER #4
(FIT-2101) (FIT-2201) (FIT-2301) (FIT-2401)
(MOV-2112) (MOV-2212) (MOV-2312) (MOV-2412)
(MOV-2111) (MOV-2211) (MOV-2311) (MOV-2411)
(MOV-2113) (MOV-2213) (MOV-2313) (MOV-2413)
2 5
3 4
FILTER STRUCT.

SUPPORT PANEL

WITH SS STRUT AND

HARDWARE AS
REQUIRED.

POWER PULLBOX

ABOVE GROUND
FILTER #1
(F-2100)
FILTER #2
(F-2200)
FILTER #3
(F-2300)
FILTER #4
(F-2400)
2 5
4 3
2 5
4 3
4 4
2 3
6 (TYP.)
2 3 2 3 2 3
5 5 5 5
9 10
ABOVE GROUND POWER PULLBOX #2 FILTER (F-2100)
ABOVE GROUND POWER PULLBOX #3 FILTER (F-2200)
11 ABOVE GROUND POWER PULLBOX #4 FILTER (F-2300)
ABOVE GROUND POWER PULLBOX #5 FILTER (F-2400)
9 10 11 12
9 10 11 12

PULLED FROM FILTER POWER
PULLBOX #1 & DISCONNECT SERVICE
SEE SHEET E3.0
P200B
P201 P206 P211 P216
P200B
P201 P206 P211 P216
P205 P210 P215 P220
FILTER #1
(F-2100)
FILTER #2
(F-2200)
FILTER #3
(F-2300)
FILTER #4
(F-2400)
P204 P202 P203 P208 P207 P209 P214 P212 P213 P218 P217 P219 PANEL "D" MINI POWER CENTER 15KVA, 3PH, 480V-208Y/120V, PRIMARY PROTECTION SHALL BE 40A & SECONDARY PROTECTION DEVICE SHALL BE 50A. NEMA 4X, EATON CATALOG NO.

P48G28T1524HCUBS64X OR APPROVED EQUAL.
13 PULLED FROM FILTER POWER PULLBOX #1
SEE SHEET E3.0
P200C
P200C
1 12

DETAIL 'A'
13 A
-
13 1

CONTROL PLAN FILTERS AREA
E3.4
37 SCALE: 1/4" = 1' - 0"

FILTER AREA CONTROL PLAN
SCALE: 1/4" = 1' - 0"

FILTER ELEVATION (LOOKING EAST)

REFER TO FILTER ELEVATION
BELOW, THIS DWG. APP. DATE BY DATE NO
JOB NO. B789-07
OF 61 SHEETS JOBSWEETWATER AUTHORITY REVISIONS TITLE 06-30-2025 -- PROJECT ENGINEER PREPARED BY BASHAR ISHAQ R.C.E. NO. EXP. DRAWN R.S. DESIGNED R.S. CHECKED BI #C64928 SCALE OCT 2023 DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION". THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 - Mech FilterTank Elec.dwg; B789-07 24x36 Elect.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 E3.4.dwg - Tab: E3.3 - by jezell on 07/16/24 at 3:55:49 PM Dimscale = 48; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 100% ISSUED FOR BID #2 CONSTRUCTION NOTES:

NOTES:

1. LABEL CONDUITS PER DETAIL "F" SHEET E6.0

2. CONDUIT ROUTING IS SHOWN DIAGRAMMATIC.

3. REFER TO FILTER VENDOR MFR DRAWING TO FLOW METER AND MOV'S FOR FILTER #1, #2, #3, and #4.

4. REFER TO MECH. DRAWING M2.0 FOR FILTER SKID EQUIPMENT.

5. REFER TO P&ID DRAWINGS.

6. PROVIDE NAMEPLATES FOR ALL DEVICES.

NEMA 4X PANEL PULLBOX DETAIL

NOT TO SCALE

FILTER INSTRUMENTATION CHART
CHART CN FILTER #1 (F1) FILTER #2 (F2) FILTER #3 (F3) FILTER #4 (F4) (FIT-2101) (FIT-2201) (FIT-2301) (FIT-2401)
(MOV-2112) (MOV-2212) (MOV-2312) (MOV-2412)
(MOV-2111) (MOV-2211) (MOV-2311) (MOV-2411)
(MOV-2113) (MOV-2213) (MOV-2313) (MOV-2413)
2 5
3 4
6 (TYP.)

INCOMING CONTROL WIRING

FROM RIO PANEL

CONTROL WIRING TO DEVICES
FILTER STRUCT.

SUPPORT PANEL

WITH SS STRUT AND

HARDWARE AS
REQUIRED.

PER FILTER MFR. AND
SHALL BE U.L. 508A.

NEMA 4X.

CONTROL PULLBOX

ABOVE GROUND
FILTER #1
(F-2100)
FILTER #2
(F-2200)
FILTER #3
(F-2300)
FILTER #4
(F-2400)
2 3
4 5
6 7
8 9
1 FILTER POWER EQUIPMENT PANEL PULLBOX W/ LOCKABLE C.B. INSTALL PER MFR INSTRUCTIONS. PER UL 805A.

FLOW METER. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST. PROVIDE LOCAL SAFETY DISC. SW. NEMA-4X 20A, 120V - 1 POLE.

MOV 3-WAY PLUG BACKWASH VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST.

MOV 3-WAY PLUG FILTER TO DRAIN VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST.

MOV BALL THROTTLING VALVE 120V. REFER TO MECHANICAL DRAWING M0.0 EQUIPMENT LIST.

ALL FINAL CONNECTIONS TO DEVICES WITH MIN. 3 FT LFMC, REDUCERS AND FITTINGS UNDERGROUND CONDUIT PER E6.2 DETAIL 'B'.
10 4 4 4
4 2 3 2 3 2 3 2 3
5 5 5 5
2 5
4 3
2 5
4 3
4 4
6 (TYP.)
7 (TYP.)
PULLED FROM U.G CONTROL
PULLBOX #1 SEE SHEET E3.1
7 (TYP.)
PULLED FROM U.G CONTROL
PULLBOX #1 SEE SHEET E3.1
ABOVE GROUND CONTROL PULLBOX #2 FILTER (F-2100). STANCHION MTD. PER E6.3 DETAIL 'C'
11 8 9 10 11
8 9 10 11
C300B C310B C320B C319
P304 P314 P324 P334
C300B C310B C320B C330B
C303
P301
C302
C323
P321
C322
C313
P311
C312
C333
P331
C332
C300B
C310B
C320B
C330B
ABOVE GROUND CONTROL PULLBOX #3 FILTER (F-2200). STANCHION MTD. PER E6.3 DETAIL 'C'
ABOVE GROUND CONTROL PULLBOX #4 FILTER (F-2300). STANCHION MTD. PER E6.3 DETAIL 'C'
ABOVE GROUND CONTROL PULLBOX #5 FILTER (F-2400). STANCHION MTD. PER E6.3 DETAIL 'C'
A
-

DETAIL 'A'
C300B
C310B
C320B
C330B
APP. DATE BY DATE NO
JOB NO. B789-07
OF 61 SHEETS JOBSWEETWATER AUTHORITY REVISIONS TITLE 06-30-2025 -- PROJECT ENGINEER PREPARED BY BASHAR ISHAQ R.C.E. NO. EXP. DRAWN R.S. DESIGNED R.S. CHECKED BI #C64928 SCALE OCT 2023 DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION". THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36 Elect.dwg W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 E7.1 ECD II VFD.dwg - Tab: ELEMENTARY CONTROL DIAGRAM II - by jezell on 07/16/24 at 4:40:35 PM Dimscale = 24; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 100% ISSUED FOR BID #2 ELEMENTARY CONTROL DIAGRAM II E7.1
47 LEGEND:

EXTERNAL WIRING
MOUNTED ON DOOR *
NOTES:

1. EACH VFD SHALL BE INSTALLED IN VENTILATED NEMA 12 ENCLOSURE

2. ALL VFD WIRING SHALL BE MADE IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS AND/OR RECOMMENDATIONS.

3. THE VFD SHALL BE REMOTELY CONTROLLED AND MONITORED BY THE RIO VIA ETHERNET WHEN THE

HAND-OFF-AUTO SWITCH IS IN AUTO POSITION

4. CONTROL SCHEMATIC SHOWN FOR REFERENCE

5. VFD SHALL BE PROGRAMMED TO RUN IN MANUAL MODE IF THE HAND-OFF-AUTO SWITCH IS IN HAND

POSITION

6. ALL MOTORS RUN BY A VFD MUST BE INVERTER-DUTY
MOTOR SCHEMATIC VFD FOR BOOSTER PUMPS - (PMP-1911, PMP-1912, PMP-1913) & DECANT PUMP (PMP-1914) AND SLUDGE PUMP (PMP-3111)

THERMOSTAT
480V
CØ
BØ
AØ
F1
480V
120V
F2

CPT (SIZE PER MFR)
F10
L1
L2
L3
T1
T2
T3

M MOTOR

VARIABLE FREQUENCY

DRIVE (VFD)
FAN 2
FAN 1
REMOTE
START

ENABLED
24V
VFD
KEYPAD

COMM CABLE

AUTO OFF HAND
HS
L
PTT G
L
PTT R

ELAPSED TIME
METER

RUNNING LIGHT

FAIL LIGHT

FAIL CONTACT

RUNNING

CONTACT
L N
ETM
10V+
AI1
ACOM

DOOR MOUNTED
POT
*
N

COMM CABLE

ETHERNET
TO RIO
MANUAL
START
RESET *
RESET
*
BKR F1A
F2A
F3A
LINE

REACTOR
LINE

REACTOR
LINE

REACTOR
PW BOOSTER PUMPS VFD'S BOOSTER PUMP STATION - REMOTE I/O PANEL UPS ALLEN BRADLEY PLC PUMP ROOM RADIO HMI IOC ETHERNET SWITCH SCADA COMPUTER DSL MODEM UPS MANAGED ETHERNET SWITCH CAT 6 TWISTED SHIELDED PAIR ETHERNET CABLE (PER SPEC) DIGITAL INPUTS & OUTPUTS ANALOG INPUTS & OUTPUTS OPERATION CENTER FE MN REMOVAL BLDG- ELECTRICAL ROOM NATIONAL CITY WELL PUMP STATION B-301 RIO INTERFACE MODULE 1 DSL MODEM TO CITY SCADA HARDWIRE CONNECTION PUMP 2 VFD PUMP 1 VFD PUMP 3 VFD PUMP 4 VFD PUMP 5 VFD MOTOR CONTROL CENTER PUMP 6 VFD RIO INTERFACE MODULE 2 DIGITAL INPUTS & OUTPUTS ANALOG INPUTS & OUTPUTS CCCC PLC ETHERNET SWITCH RDP ETHERNET SWITCH OIT FIBER PATCH PANEL FIBER OPTIC CABLE (PER SPEC) FIBER PATCH PANEL CAT 6 TWISTED SHIELDED PAIR ETHERNET CABLE (PER SPEC) POWER METER

NETWORK DIAGRAM
P&ID 55
APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36.dwg; B789-07 - P&ID.dwg
W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 - I0.1 NETWORK DIAG.dwg - Tab: NETWORK DIAGRAM P&ID - by jezell on 07/16/24 at 3:40:08 PM Dimscale = 1; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech) ; Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2

NETWORK DIAGRAM
P&ID I0.1
FILTER #1 SAMPLE VALVE STATION 1 FILTER 1 PULLBOX #1
E E

E E E E
6"-BW
6"-DRAIN
4 4
4 4
4 4
4 12" - RAW 12" - FILTRATE 8"- BW 12" - RAW
C
C

C C C C
C
C
C
4 3 2111 2111 2111 2111 2111 2111 2112 2112 2112 2112 2113 2113 2113 2113 2113 2113 2101 2101 4"- DRAIN E C 2112 2112 2112
C
C
C
C
C
C
C
FILTERS I 57
APP. DATE BY DATE NO JOB NO. B789-E OF 61 SHEETS
JOB

SWEETWATER AUTHORITY

REVISIONS
TITLE
06-30-25
-- PROJECT ENGINEER

PREPARED BY
ANDREW T. KOMOR
R.C.E. NO.

EXP.

DRAWN
JRE

DESIGNED
ATK

CHECKED
ATK
# C64928
SCALE
JUL 2025
DATE 17520 Newhope Street, Suite 200 | Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com
Advanced Water Engineering
MANNER NOR BE USED FOR CONSTRUCTION UNLESS STAMPED "ISSUED FOR CONSTRUCTION".

THESE DRAWINGS ARE THE PROPERTY OF P.A.C.E. AND SHALL NOT BE REPRODUCED IN ANY SHEET Xrefs: B789-07 24x36.dwg; B789-07 - P&ID.dwg
W:\B789\Engineering\B789-07 - SWEETWATER\sheets\B789-07 - I2.0 FILTERS 1&2.dwg - Tab: I20 - by jezell on 07/16/24 at 3:39:59 PM Dimscale = 1; LTscale = 1; PSltscale = 1; ACAD Ver. = 23.0s (LMS Tech); Visretain = 1 OR
MOK . T WERDNA

I F SSE
A
I N
E
E
R
L
ENG
D
No. C64928

O I F RN
AI
E AT V
C
C I
OF
I
A
L
L
Exp. 06-30-25
N
PRO
O
TSI G
ER
S
RE
T
E
100% ISSUED FOR BID #2
FILTERS I I2.0

EXHIBIT B

SCHEDULE
Fee Schedule and Rate Sheet Matrix * Fees from these sub-consultants are Project Name: Source Water Quality Assessment and Design of Treatment Facilities in lump sums.

Client: City of Vernon, Public Utilities Department (Excludes Optional Tasks) PACE Job Number: #C361
Estimate Date: October 28, 2024 (Revised as of 1/23/2025) Fees presented are “not to exceed” amounts.

Structural Engineer
Version 2 With Negotiated Reduction (1/23/2025)
$ 300 $ 260 $ 245 $ 250 $ 220 $ 200 $ 150 $ 145 $ 100 $ 290 0 311 126 130 635 53 928 738 142 0 0 0 0 0 0 2,803 $508,650 $33,000 $541,650 260 $46,290 $128,100 $174,390 1 Task 1 - Assessment - Phase I 0 84 26 26 160 0 300 40 33 0 0 0 0 0 0 464 $86,350 $0 $86,350 205 $37,660 $128,100 $165,760 2 Subtask 1.1 - Review Record Drawings, Water Quality Data, and Relevant Information 8 24 80 4 116 $19,760 $19,760 0 $0 $0 $0 3 Subtask 1.2 - Obtain Baseline Water Quality Test Data 0 $0 $0 0 $0 $0 $0 4 Subtask 1.3 - Identify Treatment Options and Concept Treatment Layout, Including Blending with Corresponding Impacts to the Existing Water System 24 16 16 32 60 40 4 192 $36,400 $36,400 0 $0 $0 $0 5 Subtask 1.4 - Pilot Testing (Optional but Highly Recommended) (Assumed for 2 Sites) 6 24 100 8 0 $0 $0 138 $22,640 $17,300 $39,940 6 Subtask 1.5 - Well Survey Video to Inspect Casings (Optional) (Assumed for 2 Sites) 6 16 1 0 $0 $0 23 $5,180 $14,800 $19,980 7 Subtask 1.6 - Zone Isolation and Testing using the Tracer Dye Method w/Report (Optional) (Assumed for 2 Sites) 8 12 2 0 $0 $0 22 $4,920 $46,000 $50,920
8 Subtask 1.7 - Depth-Specific Water Quality Sampling w/Report (Optional) (Assumed for 2 Sites) 8 12 2 0 $0 $0 22 $4,920 $50,000 $54,920 9 Subtask 1.8 - Draft Assessment and Proposed Treatment Options Report (Tech Memo) 16 6 6 24 40 8 100 $19,210 $19,210 0 $0 $0 $0 10 Subtask 1.9 - Final Assessment and Proposed Treatment Options Report (Tech Memo) 8 4 4 16 20 4 56 $10,980 $10,980 0 $0 $0 $0 11 Task 2 - Design - Phase II (On-Site Treatment System at Well No. 20 and No. 22) 0 141 66 76 333 50 496 666 63 0 0 0 0 0 0 1,836 $323,730 $33,000 $356,730 55 $8,630 $0 $8,630 12 Subtask 2.1 - Assist the City w/Internal City Permits (i.e. Building, Fire, etc.) 0 $0 $0 0 $0 $0 $0 13 Subtask 2.2 - Topographic Survey & Prepare Basemap 4 8 32 48 2 94 $14,760 $13,200 $27,960 0 $0 $0 $0 14 Subtask 2.3 - Pipe Locating & Potholing (Optional) (Assumed 2 Days Total) 0 $0 $0 0 $0 $0 $0 15 Subtask 2.4 - Soil Borings and Geotechnical Report (1-50' Deep Boring at Well 20 & 1-30' Deep Boring at Well 22) 2 4 2 2 10 $1,890 $19,800 $21,690 0 $0 $0 $0
16 Subtask 2.5 - Assist the City to Obtain DDW Approval 10 16 24 6 6 62 $11,190 $11,190 0 $0 $0 $0 17 Subtask 2.6 - Prepare 70% Submittal (Plans) 64 32 38 96 190 320 6 746 $130,600 $130,600 0 $0 $0 $0 18 Subtask 2.7 - Prepare 90% Submittal (Plans, Specifications, & Estimate) 40 20 24 120 32 130 160 24 550 $99,200 $99,200 0 $0 $0 $0 19 Subtask 2.8 - Prepare 100% Submittal (Plans, Specifications, & Estimate) 12 10 10 64 12 64 80 12 264 $46,950 $46,950 0 $0 $0 $0 20 Subtask 2.9 - Prepare Signed PS&E Package for Bid 6 4 4 20 6 24 40 6 110 $19,140 $19,140 0 $0 $0 $0 21 Subtask 2.10 - Prepare 90% Pre-Purchase Pressure Vessels Package (Optional) 2 3 22 7 3 0 $0 $0 37 $5,795 $0 $5,795 22 Subtask 2.11 - Prepare Final Pre-Purchase Pressure Vessels Package (Optional) 1 2 10 3 2 0 $0 $0 18 $2,835 $0 $2,835 23 Task 3 - Project and Construction Management - Phase III 0 86 34 28 142 3 132 32 46 0 0 0 0 0 0 503 $98,570 $0 $98,570 0 $0 $0 $0 24 Subtask 3.1 - Project Management & Meetings During Design 40 4 4 16 8 72 $16,700 $16,700 0 $0 $0 $0 25 Subtask 3.2 - Assist the City w/CEQA Exemption Process 0 $0 $0 0 $0 $0 $0 26 Subtask 3.3 - Bid Phase and Construction Engineering Support, Including Mandatory Pre-Bid Construction Meetings (T&E) (RFIs, Submittals, CORs, Coordination, etc.) 40 30 24 80 3 120 32 329 $63,150 $63,150 0 $0 $0 $0 27 Subtask 3.4 - Construction Management & Meetings (T&E) (Assumed 2 Hours/Day for 18 Months) 0 $0 $0 0 $0 $0 $0 28 Subtask 3.5 - Oversight of Operational Start-Up Testing (T&E) (Assumed Up to 4 Full Days) 4 40 4 48 $10,240 $10,240 0 $0 $0 $0 29 Subtask 3.6 - Prepare Record Drawings from Contractor's Redline Plan Set 2 6 12 32 2 54 $8,480 $8,480 0 $0 $0 $0 2,803 $508,650 $33,000 $541,650 260 $46,290 $128,100 $174,390 BESS Testlab (Pipe Locating/Potholing) *BESST (Hydrogeologist / Camera, Zone Testing
& Depth Sampling) *
$174,390
$541,650
Recommended Optional Task(s):

Total Fee Amount (w/o Optional Tasks):

Total Fee Amount (w/ Optional Tasks):

GPS Survey UnitTotal Task CostsMan Power Subtotal (Optional)Total Task Costs (Optional) Fee Summary (Excludes Opt. Tasks) Man Power Subtotal Task Costs Subtotal Lump Sum Fee for Services Huitt-Zollars (Topographic Survey) *
Sr Electrical Engineer(See LS Fee Column)
Subs.

EPA Solutions (CEQA Compliance) *
Item No.

Work Item Description
Principal Sr Project ManagerSr Inst. & Cont. SpecialistDesign EngineerAdmin Support(See LS Fee Column) Estimated PACE Manhours Sr Project Engineer
Terracon (Geotechnical) *
CAD Spec / GIS Analyst(See LS Fee Column) (Optional)(See LS Fee Column) (Optional) Fee Summary of Optional Tasks Lump Sum Fee for Services (Optional) $716,040
(See LS Fee Column)Task Costs Subtotal (Optional)

EXHIBIT C

EQUAL EMPLOYMENT OPPORTUNITY

PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees are treated equally and are not discriminated against because of their race, religious creed, color, national origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated facilities.

B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will receive consideration for employment without regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age.

C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this Agreement, discriminated against applicants or employees because of their membership in a protected class.

D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding authority, provide copies of all of its records pertaining or relating to its employment practices, except to the extent such records or portions of such records are confidential or privileged under state or federal law.

E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is prohibited by law.