Cities Index.
1. 2024 Power Source Disclosure Program Annual Report

Vernon City Council
September 16, 2025

Document
1. 2024 Power Source Disclosure Program Annual Report
Meeting
September 16, 2025
Body
Vernon City Council
Original file
137 KB
Text extracted from the city's file for reading and search. Open the original on cityofvernon.primegov.com. That file is the official record.

Version: April 2025
Submit the Annual Report and signed Attestation in PDF format with the Excel version of the Annual Report to [email protected]. Remember to complete the Retail Supplier Name and contact information above.

NOTE: Information submitted in this report is not automatically held confidential. If your company wishes the information submitted to be considered confidential an authorized representative must submit an application for confidential designation California Energy Commission's website.

If you have questions, contact Power Source Disclosure (PSD) staff at [email protected] or (916) 639-0573.

EMAIL [email protected]

WEBSITE URL

FOR PCL

POSTING
www.cityofvernon.org
MAILING 4305 Santa Fe Ave.

CITY, STATE, ZIP Vernon, CA 90058
PHONE (323) 583-8811 ext 579
TITLE General Manager of Vernon Public Utilities
2024 POWER SOURCE DISCLOSURE ANNUAL REPORT
For the Year Ending December 31, 2024
Retail suppliers are required to use the posted template and are not allowed to make edits to this format. Please complete all requested information.

GENERAL INSTRUCTIONS

RETAIL SUPPLIER NAME
City of Vernon: Vernon Public Utilities

CONTACT INFORMATION
NAME Todd Dusenberry
Annual Data VPU General Power Mix Portfolio Totals PCL Data Instructions: Retail Sales 1025636

1. Enter the electricity portfolio name in cell O25 and additional electricity portfolio names as needed in cells P25-V25. Total Specified 9312852. Enter information about all power procurements and retail sales. Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. Biomass & Biogas 35567 3%3. For all specified purchases, enter the facility name, fuel type, state or province, WREGIS ID of REC source, RPS ID of REC source, EIA ID of delivered energy, gross MWhs procured, and specified resales MWhs. Geothermal 0 0%4. For firmed-&-shaped procurements specifically, enter all fields from step 3. Additionally, enter the EIA ID of the substitute power in the "EIA ID of delivered energy" field and select "Yes" in the "Firmed-&-Shaped Resource?" field. If the associated GHG emissions are eligible for firmed-&-shaped grandfathering, select "Yes" in the relevant field. Eligible Hydroelectric 0 0%5. Proxy EIA IDs for unspecified power and specified system mixes from asset-controlling suppliers have been provided. Enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable. Solar 415866 41%6. Proxy EIA IDs for aggregated reporting of WAPA CVP or PCIA resoures; Enter "CVP", "PCIA Solar", "PCIA Wind", "PCIA Eligible Hydro", or "PCIA Large Hydro" as applicable. Wind 0 0%7. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in the individual electricity portfolio tables to the right after all specified resources have been allocated. Large Hydroelectric 18003 2%8. Allocate net MWhs procured to each electricity portfolio until the loads are balanced across each portfolio. If the total Net MWhs Procured exceeds the total retail sales of all portfolios, allocate only enough MWh to meet the retail sales of each portfolio. Nuclear 93960 9% Emerging Technologies 0 0%
Other 0 0%
Natural Gas 367888 36%Coal & Petroleum 0 0%
Unspecified Power - ACS 0
Unspecified Power - Spot Market 94351Unspecified Power - Total 94351 9% Over allocation
check ✓ Total PCL GHGs (MT CO2e) 203820.1
Under allocation
check
✓ Emissions intensity (MT CO2e/MWh) 0.199
Coal check ✓ PCL GHG Intensity (lbs CO2e/MWh) 438
Negative
oversupply check ✓ Unbundled REC % 3%
Retail Sales 1025636
Unmet Load
94351 0 0 0 0 0 0 0
VPU General Power Mix
Facility Name Fuel Type State or Province WREGIS ID of REC source
RPS ID of
REC
source
EIA ID of
delivered
energy
Gross
MWhs
Procured
Specified
Resales
MWhs
Net MWhs
Procured
Firmed &
Shaped
Resource?
Eligible for Firmed
& Shaped
Grandfathering?
Total EF
(MT
CO2e/MWh)
Total
GHGs
PCL EF
(MT
CO2e/MWh)
VPU General
Power Mix
Electricity Portfolio
#2 Name
Electricity Portfolio
#3 Name
Electricity Portfolio
#4 Name
Electricity Portfolio
#5 Name
Electricity Portfolio
#6 Name
Electricity Portfolio
#7 Name
Electricity Portfolio
#8 Name Remainder/Oversupply Facility Name Fuel Type Net Procurement Annual
PCL
GHGs (MT
CO2e)
Antelope DSR1 - Antelope DSR1 Solar California W5083 63125A 60186 57797 57797 0.0000 0.0000 57797 Antelope DSR1 - Antelope DSR1 Solar 57797.1736 0RE Astoria 2 - Astoria 2 Solar California W4931 62691A 59977 63440 63440 0.0000 0.0000 63440 RE Astoria 2 - Astoria 2 Solar 63440 0Puente Hills Biomass & Biogas California W448 60290A 10472 35567 35567 0.6253 22240 0.0034 35567 Puente Hills Biomass & Biogas 35567.30388 120.9288Desert Harvest 2 - Desert Harvest 2 Solar California W10627 64329A 64103 28020 28020 0.0000 0.0000 28020 Desert Harvest 2 - Desert Harvest 2 Solar 28020 0Daggett Solar Power 2 LLC Solar California W16038 63974A 64851 181179 181179 0.0000 0.0000 181179 Daggett Solar Power 2 LLC Solar 181179 0Malburg Generating Station Natural Gas California 56041 367706 367706 0.4438 163188 0.4438 367706 Malburg Generating Station Natural Gas 367706.2008 163188Gonzales Natural Gas California 56039 182 182 0.7076 129 0.7076 182 Gonzales Natural Gas 181.9249897 128.7301Palo Verde Nuclear Arizona 6008 93960 93960 0.0000 0.0000 93960 Palo Verde Nuclear 93960 0Hoover Large Hydroelectric Nevada 154 18003 18003 0.0000 0.0000 18003 Hoover Large Hydroelectric 18003 0Baldy Mesa Solar Solar California W15593 64012A 66598 24836 24836 0.0000 0.0000 24836 Baldy Mesa Solar Solar 24836 0McFarland Solar B Solar Arizona W18995 65151A 66637 60594 60594 0.0000 0.0000 60594 McFarland Solar B Solar 60594 0 32,000

RETIRED UNBUNDLED RECS
Facility Name Fuel Type
State or
Province RPS ID Total Retired (in MWh)
Sierra Pacific Burney Facility Biomass California 60087A 752 Sierra Pacific Ind. (Lincoln) Biomass California 60088A 1343 Sierra Pacific Ind. (Quincy) Biomass California 60089A 1411 Sierra Pacific Sonora Biomass California 60576A 576
South Peak Wind LLC Wind Montana 64598A 12000
SPI Anderson 2 Onsite Load Biomass California 61146A 918 Weed Cogen - Weed Powerhouse Onsite LoaBiomass California 60501A 15000 Total Retired Unbundled RECs
VPU General Power Mix
Net MWh Procured N/A Resource Type Resource Mix Factors Resource-Specific Procurements
from ACS
Biomass & biogas -
Geothermal -
Eligible hydroelectric -
Solar -
Wind -
Coal -
Large hydroelectric 0.84 -
Natural gas -
Nuclear 0.11 -
Other 0.01 -
Unspecified Power 0.04 -
Net MWh Procured N/A Resource Type Resource Mix Factors Resource-Specific Procurements
from ACS
Biomass & biogas -
Geothermal -
Eligible hydroelectric -
Solar -
Wind -
Coal -
Large hydroelectric 0.89 -
Natural gas -
Nuclear 0.06 -
Other -
Unspecified Power 0.06 -

ASSET CONTROLLING SUPPLIER RESOURCE MIX CALCULATOR
Bonneville Power Administration
Tacoma Power
Instructions: Enter total net specified procurement of ACS system resources into cell A8 or A23.

In Column E, the calculator will determine quantities of resource-specific net procurement for entry on Schedule 1.
2024 POWER SOURCE DISCLOSURE ANNUAL REPORT

ATTESTATION FORM
For the Year Ending December 31, 2024
City of Vernon: Vernon Public Utilities
I, Todd Dusenberry,
General Manager of Public Utilities, City of Vernon, declare under penalty of perjury, that the information provided in this report is true and correct and that I, as an authorized agent of , City of Vernon, have authority to submit this report on the retail supplier's behalf. I further declare that all of the electricity claimed as specified purchases as shown in this report was sold once and only once to retail customers.

Name: Todd Dusenberry
Representing (Retail Supplier): City of Vernon
Signature: __________________________________________________________ Dated: ___May 29, 2025
Executed at: __Vernon, CA

← All documents from this meeting