.
.
Item 17 Page 27 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. OL-1
OUTDOOR AREA LIGHTING SERVICE
APPLICABILITY
Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
LUMINAIRE CHARGE:
Energy Curtailment Service
Midnight or
All Night Service Equivalent Service Facilities Charge
Lamp Size-Lumens Per Lamp Per Month Per Lamp Per Month Per Lamp Per Month High-Pressure Sodium
Vapor Lamps
5,800 Lumens $20.80 $19.57 $13.99
9,500 Lumens $24.36 $22.11 $14.40
22,000 Lumens $36.36 $31.38 $16.58
POLE CHARGE (to be added to Luminaire Charge): Per Pole Per Month
For each additional new wood pole installed: $6.74
Resolution No. 2026-029
.
.
Item 17 Page 28 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Hours of Service: Area all night lighting service will be furnished from dusk to dawn, approximately 4,140 hours per year, by Utility-owned luminaires supplied from the Utility's existing 120/240 volt overhead circuits and mounted on existing Utility-owned wood poles as standard equipment.
2. Other Than Standard Equipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in installation cost installed between such equipment and standard equipment.
Advances made for this purpose will not be refunded. Facilities installed in connection with such agreements become and remain the sole property of the Utility. Utility will provide customer with adjusted per lamp charges and customer will pay such charges.
3. Service and Facilities Furnished: This service will be in accordance with Utility's specifications as to the equipment, installation, maintenance, and operation.
4. Replacement of Lamps: The Utility will replace lamps on a scheduled basis, and individual lamps will be replaced upon service failure, as soon as practical after notification by customer, subject to Utility's operating schedules.
5. Contract: A written contract for a term of three year will be required by the Utility when service is first established under this schedule.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
8. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 29 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
9. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 30 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-1
POWER-AGRICULTURAL AND PUMPING
CONNECTED LOAD BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes or for general water or sewerage pumping.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Horsepower of
Connected Load Monthly Service Charge
Per Meter Per Meter Per hp
2 and over ………………………………………… $ 2.74
Facilities Charge ………………………………………… $ 19.52
Energy Charge to be added to Service Charge-Rate
All kWh, per kWh ………………………………………… 25.499¢
Minimum Charge: The monthly minimum charge shall be the monthly Service Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard power voltage.
Resolution No. 2026-029
.
.
Item 17 Page 31 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service. The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt-ampere input capacity of other equipment, with each kilovolt-ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information.
3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be determined by the Utility or upon notification by the customer of a permanent change in operating conditions.
4. Temporary Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made.
5. In-Lieu Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
7. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Resolution No. 2026-029
.
.
Item 17 Page 32 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
8. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 33 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-2
POWER-AGRICULTURAL AND PUMPING
DEMAND BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Demand Charge:
First 75 kW or less of billing demand $1,396.36
All excess kW of billing demand, per kW $18.62
Energy Charges (to be added to Demand Charge):
All kWh per kWh 19.596¢
Minimum Charge:
The monthly minimum charge shall be the monthly Demand Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 50% of the highest maximum demand established in the Resolution No. 2026-029
.
.
Item 17 Page 34 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
preceding eleven months, however, in no case shall the billing demand be less than 75 kW. Billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month.
Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
4. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatthours. Demand in kilowatts and kilovars shall be determined to the nearest unit.
A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
5. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
Resolution No. 2026-029
.
.
Item 17 Page 35 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer’s load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
Resolution No. 2026-029
.
.
Item 17 Page 36 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
9. Contract Demand: A contract demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule.
Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
10. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
11. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
12. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 37 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-TOU
POWER-AGRICULTURAL AND PUMPING
TIME-OF-USE
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is elective for customers with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge $1,415.95
Automated Meter Reading (AMR) Meter Charge ($/Mo) $16.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW $ 32.67 Plus all kW of mid-peak maximum billing demand, per kW $ 5.06 Plus all kW of off-peak billing demand, per kW No Charge* Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh 10.109¢
Plus all mid-peak kWh, per kWh 9.475¢
Plus all off-peak kWh, per kWh 8.529¢
*(Subject to Minimum Demand Charge. See Special Condition No. 11.) Resolution No. 2026-029
.
.
Item 17 Page 38 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak: 1:00 p.m. to 7:00 p.m.
Summer Weekdays except holidays
5:00 p.m. to 10:00 p.m.
Winter weekdays except holidays
Mid-Peak 9:00 a.m. to 1:00 p.m. and
7:00 p.m. to 11:00 p.m.
Summer weekdays except holidays
8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak: All other hours:
Off-Peak Holidays are: New Year's Day (January 1),
Washington's Birthday (third Monday in February),
Memorial Day (last Monday in May), Independence Day
(July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 25% of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 50 kW.
Billing demand shall be determined to the nearest kW.
Resolution No. 2026-029
.
.
Item 17 Page 39 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
4. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
7. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
8. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
9. Excess Transformer Capacity: The transformer capacity in excess of a customer’s contract demand which is either required by the Utility because of the nature of the customer’s load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
Resolution No. 2026-029
.
.
Item 17 Page 40 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
10. Contract Demand: A contract demand will be established by the Utility, based on applicant’s demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule.
Contract demand is based upon the nominal kilovolt-ampere rating of the Utility’s serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer’s stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
11. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
12. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
13. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 41 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TC-1
TRAFFIC CONTROL SERVICE
APPLICABILITY
Applicable to single-phase service for traffic-directional signs or traffic-signal systems located on streets, highways and other public thoroughfares and to railway crossing and track signals.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge: ……………………………………. $ 12.31
Energy Charge (to be added to Customer Charge):
All kWh, per kWh ……………………………………. 22.734¢
Minimum Charge: The monthly minimum charge shall be
the monthly Customer Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage not in excess of 240 volts or, at the option of the Utility, at 240/480 volts, three-wire, single-phase.
2. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
4. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Resolution No. 2026-029
.
.
Item 17 Page 42 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
5. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 43 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU GS-1
GENERAL SERVICE
APPLICABILITY
Applicable to single and three-phase general service including lighting and power.
Service under this schedule is elective for all customers taking service under Schedule GS-1. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept Nov. thru April
Customer Charge $60.53 $60.53 $60.53
Facilities Charge $22.90 $22.90 $22.90
Meter Charge $16.17 $16.17 $16.17
Energy Charge:
All on-peak kWh, per kWh 36.496¢ 60.084¢ 24.081¢
Plus all mid-peak kWh, per kWh 25.703¢ 32.079¢ 23.015¢
Plus all off-peak kWh, per kWh 19.367¢ 23.377¢ 19.303¢
Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge.
Resolution No. 2026-029
.
.
Item 17 Page 44 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to service separately an X-ray installation, the billing will be increased by $1.03 per kVA of transformer capacity requested.
4. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
Resolution No. 2026-029
.
.
Item 17 Page 45 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
5. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
7. Excess Transformer Capacity: The amount of transformer capacity requested by a customer which is in excess of the applicable standard transformer size determined by the Utility as required to serve the customer's measurable kilowatt demand. Excess transformer capacity shall be available to all customers under this schedule and shall be billed at $1.03 per kVA per month.
8. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
9. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
10. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 46 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU GS-2
GENERAL SERVICE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
Service under this schedule is elective for all customers taking service under Schedule GS-2. This schedule is not applicable to customers with demands of 500 kW or higher for any three months during the preceding twelve. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Meter Charge $38.63 $38.63 $38.63
Demand Charge (per kW): $31.10 $31.10 $31.10
Energy Charge:
All on-peak kWh, per kWh 15.540¢ 18.512¢ 16.111¢
Plus all mid-peak kWh, per kWh 14.931¢ 16.425¢ 14.791¢
Plus all off-peak kWh, per kWh 11.566¢ 13.200¢ 12.784¢
*(Subject to Contract Demand. See Special Condition No. 9.) Minimum Charge:
The Demand Charge plus the Energy Charge shall be subject to a monthly minimum charge of $248.73.
Resolution No. 2026-029
.
.
Item 17 Page 47 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW.
4. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW.
5. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute interval in the month.
Resolution No. 2026-029
.
.
Item 17 Page 48 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
6. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
7. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
8. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to serve separately an X-Ray installation, the minimum charge will be increased by $1.03 per kVA of transformer capacity requested.
9. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
10. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
Resolution No. 2026-029
.
.
Item 17 Page 49 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
11. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the kilowatt demand, whichever is less and is expressed in kilowatts.
12. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
13. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
14. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
15. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
16. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 50 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
17. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 51 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU PA-1
POWER-AGRICULTURAL AND PUMPING
CONNECTED LOAD BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes or for general water or sewerage pumping. Service under this schedule is elective for all customers taking service under Schedule PA-1. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Customer Charge (per Horse Power of Connected Load) $8.40 $8.40 $8.40 Facilities Charge $19.15 $19.17 $19.17
Meter Charge $37.69 $37.69 $37.69
Demand Charge:
Energy Charge:
All on-peak kWh, per kWh 36.204¢ 60.138¢ 23.610¢
Plus all mid-peak kWh, per kWh 25.254¢ 31.723¢ 22.528¢
Plus all off-peak kWh, per kWh 18.826¢ 22.896¢ 18.762¢
Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge.
Resolution No. 2026-029
.
.
Item 17 Page 52 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
Time Period:
1. Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard power voltage.
3. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service.
The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt-ampere input capacity of other equipment, with each kilovolt-ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information.
Resolution No. 2026-029
.
.
Item 17 Page 53 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
Resolution No. 2026-029
.
.
Item 17 Page 54 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
4. Overload Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be determined by the Utility or upon notification by the customer of a permanent change in operating conditions.
5. Temporary Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made.
6. In-Lieu and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
8. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
9. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 55 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-D
DOMESTIC SERVICE
APPLICABILITY
Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation. Service under this schedule is elective for all customers taking service under Schedule D. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept. Nov. thru April
Customer Charge $4.12 $4.12 $4.12
Facilities Charge $1.53 $1.53 $1.53
Meter Charge $7.02 $7.02 $7.02
Energy Charge:
All on-peak kWh, per kWh 33.925¢ 33.805¢ 8.011¢
Plus all mid-peak kWh, per kWh 8.011¢ 8.011¢ 8.011¢
Plus all off-peak kWh, per kWh 8.011¢ 8.011¢ 8.011¢
The monthly minimum charge shall be the monthly Customer Charge.
Resolution No. 2026-029
.
.
Item 17 Page 56 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
4. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor Resolution No. 2026-029
.
.
Item 17 Page 57 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
(ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
5. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 58 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-G
GENERAL SERVICE-LARGE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
Service under this schedule is elective for customers served under Schedule No. GS-2 with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is elective for all existing customers with time of use metering who have been taking service under Schedule TOU-V with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding 12 months. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept Nov. thru April
Customer Charge $1,415.95 $1,415.95 $1,415.95
Automated Meter Reading (AMR) Meter Charge ($/Mo) $16.30 $16.30 $16.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW $29.98 $35.44 $29.98 Plus all kW of mid-peak maximum billing demand, Per kW $5.50 $5.50 $5.50 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge*
Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh 10.308¢ 12.849¢ 10.308¢
Plus all mid-peak kWh, per kWh 9.660¢ 12.203¢ 9.660¢
Plus all off-peak kWh, per kWh 8.689¢ 10.009¢ 8.689¢
*(Subject to Minimum Demand Charge. See Special Condition No. 9.) Resolution No. 2026-029
.
.
Item 17 Page 59 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, midpeak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
Resolution No. 2026-029
.
.
Item 17 Page 60 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; and by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter.
b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatthours. Demand in kilowatts and kilovars shall be determined to the nearest unit.
A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinue, will be required to pay all charges which would have been billed if service had not been discontinued.
Resolution No. 2026-029
.
.
Item 17 Page 61 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
14. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 62 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
15. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 63 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-I
GENERAL SERVICE-LARGE INTERRUPTIBLE
APPLICABILITY
This schedule is optional for all customers eligible for service under Schedule TOU-V who commit to curtail at least fifty percent (50%) of such customer’s maximum demand, which shall not be less than 7,500 kW per Period of Interruption.
In addition, the following conditions for eligibility shall apply:
1. Service Voltage must be greater than 50 kV; and
2. The customer’s Maximum Demand must be 12,500 kW or above; and
3. This schedule is in effect until suspended by the Public Utilities Department when, in their judgment, there is no additional need for Interruptible Demand.
TERRITORY
Within the city limits of the City of Vernon.
RATES
All charges and provisions of schedule TOU-V shall apply as follows:
In accordance with the terms and conditions of this schedule the customer’s bill will be credited per the following rate schedule per kW month for all kW in excess of the customer’s specified Firm Demand Level. The on-peak and mid-peak bill credits will be based on the difference between the customer’s monthly average kW demand (for on-peak and for mid-peak periods, respectively) and the customer’s specified Firm Demand Level, where
Resolution No. 2026-029
.
.
Item 17 Page 64 of 205
Schedule TOU-I
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
Monthly Average On-Peak kW Demand = Total Monthly On-Peak kWh / Total Monthly OnPeak Hours Monthly Average Mid-Peak kW Demand = Total Monthly Mid-Peak kWh / Total Monthly Mid-Peak Hours.
Rate Schedule
Interruption Capacity Credits ($/kW-month)
Summer Winter
May, June, Oct July, August, Sept Nov, thru April
On-Peak 4.56 13.65 0.26
Mid-Peak 2.24 6.21 0.59
Charges for Excess Demand may apply under certain conditions, as provided in Special Condition 8.
SPECIAL CONDITIONS
1. Interruptible Demand: The Interruptible Demand shall be the measured difference between the customer’s demand, at the time of interruption, and the customer’s Firm Demand Level. During a Period of Interruption, customer is expected to interrupt load such that it uses no more electricity than its specified Firm Demand Level.
2. Firm Demand Level: The Firm Demand Level is the Maximum Demand the Department is expected to supply during a Period of Interruption.
3. Excess Demand: The Excess Demand shall be the average kW demand measured which exceeds the Firm Demand Level during each Period of Interruption. The average kW demand is the total kWh recorded divided by total hours of interruption during each Period of Interruption.
4. Interruptible Service Agreement: To receive interruptible service under this schedule a customer shall sign an agreement for a specified term and Firm Demand Level. Eligible customers shall comply with all the provisions of their respective Agreements.
Resolution No. 2026-029
.
.
Item 17 Page 65 of 205
Schedule TOU-I
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
5. Notice of Interruption: The Department will give the customer a minimum thirty (30) minutes notice of a Period of Interruption to enable the customer to disconnect the necessary load to prevent Excess Demand. Communication procedures shall be specified in the Interruptible Service Agreement.
6. Period of Interruption: A Period of Interruption shall be an interval which commences thirty minutes after Notice of Interruption and which ends upon notification from the Department, during which time the customer will be required to disconnect sufficient load to reduce the demand on the system to the Firm Demand Level. A Period of Interruption can occur:
a. Upon the notification from the Independent System Operator (ISO) requiring the Department to shed load, or
b. Upon the unscheduled outage of the Malburg Generating Station or any other generating unit internal to the Department system.
7. Frequencies and Duration of Interruption: The Periods of Interruption will not exceed ten (10) instances per month or twenty-four per year nor last longer than twelve (12) consecutive hours in any single instance.
8. Excess Demand Charge: Upon the first occurrence of Excess Demand during a Period of Interruption, such Excess Demand shall be billed at $14.20 per kW.
Upon the second occurrence of Excess Demand during a Period of Interruption, such Excess Demand shall be billed at $21.30 per kW.
Upon the third occurrence of Excess Demand during a Period of Interruption, within the same twelve (12) month period, the customer will be disqualified from further interruptible rate service.
9. Verification of Ability to Interrupt: Interruptible Rate Service customers shall periodically be required to demonstrate ability and willingness to disconnect all load except the specified Firm Demand Level within a Notice of Interruption Period. Testing procedures for such verification shall be specified in the Interruptible Service Agreement terms.
Resolution No. 2026-029
.
.
Item 17 Page 66 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-V
GENERAL SERVICE-LARGE
APPLICABILITY
This schedule is applicable for all customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed.
TERRITORY
Within the city limits of the City of Vernon.
RATES
PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Customer Charge $1,415.95 $1,415.95 $1,415.95
Automated Meter Reading (AMR) Meter Charge ($/Mo) $16.30 $16.30 $16.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW. . . $31.29 $38.22 $24.80 Plus all kW of mid-peak maximum billing demand, per kW $5.93 $5.93 $5.93 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge* Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . . . . . 9.953¢ 12.507¢ 9.953¢ Plus all mid-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . 9.312¢ 11.866¢ 9.312¢ Plus all off-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . 8.358¢ 9.663¢ 8.358¢ *(Subject to Minimum Demand Charge. See Special Condition No. 9.) Resolution No. 2026-029
.
.
Item 17 Page 67 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
Resolution No. 2026-029
.
.
Item 17 Page 68 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; and by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
Resolution No. 2026-029
.
.
Item 17 Page 69 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
14. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 70 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
15. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 71 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-Vt
GENERAL SERVICE-LARGE
APPLICABILITY
This schedule is applicable for all customers taking service at 66KV with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed.
TERRITORY
Within the city limits of the City of Vernon.
RATES
PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept Nov. thru April
Customer Charge $1,255.86 $1,255.86 $1,255.86
Automated Meter Reading (AMR) Meter Charge ($/Mo) $16.30 $16.30 $16.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW. . . . . . $28.30 $34.56 $22.42 Plus all kW of mid-peak maximum billing demand, per kW $5.37 $5.37 $5.37 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge* Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . . . . . 8.168¢ 10.264¢ 8.168¢ Plus all mid-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . 7.643¢ 9.739¢ 7.643¢ Plus all off-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . 6.859¢ 7.930¢ 6.859¢ *(Subject to Minimum Demand Charge. See Special Condition No. 9.) Resolution No. 2026-029
.
.
Item 17 Page 72 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring Resolution No. 2026-029
.
.
Item 17 Page 73 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
Resolution No. 2026-029
.
.
Item 17 Page 74 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
4. Voltage Discount: The charges including adjustment will be reduced by 0% for service delivered and metered at voltages over 50 kV.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
Resolution No. 2026-029
.
.
Item 17 Page 75 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
14. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
15. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Resolution No. 2026-029
.
.
Item 17 Page 76 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Resolution No. 2026-029
.
.
Item 17 Page 77 of 205
PUBLIC NOTICE
The City Council of the City of Vernon will be considering the following matter at its Regular Meeting on June 16, 2026, which you may attend at Vernon City Hall, City Council Chamber, 4305 Santa Fe Avenue, Vernon, CA 90058 to:
Consider the adoption of a Resolution Amending Electric Rate Schedules Nos. CS (Customer Service Fee), D (Domestic Service), GS1 (General Service), GS-2 (General Service), LS-1 (Lighting-Street and Highway Utility-Owned System), LS-2 (Lighting-Street and Highway Customer-Owned Installation), OL-1 (Outdoor Area Lighting Service), PA-1 (Power-Agricultural and Pumping Connected Load Basis), PA-2 (Power-Agricultural and Pumping Demand Basis), PA-TOU (PowerAgricultural and Pumping Time-of-Use), TC-1 (Traffic Control Service), TOU GS-1 (General Service), TOU GS-2 (General Service), TOU PA-1 (Power-Agricultural and Pumping Connected Load Basis), TOU-D (Domestic Service), TOU-G (General Service-Large), TOU-V (General Service-Large), TOU-Vt (General Service-Large), TOU-I (General Service-Large Interruptible), and GP (Green Power) regarding electrical rates to be charged for electrical energy distributed and supplied by the City within its boundaries.
All relevant documents will be available for public review on the City’s website once the agenda for the meeting is posted or from the City Clerk at [email protected] or (323) 583-8811, ext. 546. All interested persons will be given an opportunity to comment on the above-referenced matter. In addition, written comments or questions may be submitted prior to the meeting as set forth below.
Please send your comments or questions to:
Richard Corbi, Assistant General Manager of Public Utilities City of Vernon
4305 Santa Fe Avenue, Vernon, CA 90058
(323) 583-8811, ext. 390 Email: [email protected] In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in the meeting, please contact the City Clerk Department at (323) 583-8811, ext. 546 at least 48 hours prior to the meeting to assure arrangements can be made.
Dated: May 27, 2026 Genoveva Rocha, City Clerk
Publish: June 4, 2026 .
.
Item 17 Page 78 of 205
..
Item 17 Page 79 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 EffectiveEffective 07/01/1707/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 EffectiveEffective 07/01/1907/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2007/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2107/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2207/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 EffectiveEffective 07/01/2307/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx EffectiveEffective 07/01/2307/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. CS
CUSTOMER SERVICE FEE
Returned Check Charge: $ 26.00
Late Charge: 5% of Unpaid
Balance
(Final Notice)
Reconnect Charge:
Disconnect Mon.-Fri. 7:30 a.m. – 3:00 p.m. $ 0.0
Reconnect (Standard) Mon.-Fri. 7:30 a.m. – 3:00 p.m. $
225.02319.76
Reconnect (Nonstandard) Mon.-Fri. 7:30 a.m. – 3:00 p.m. $ 588.46 Disconnect and/or Reconnect After Hours (4 Hour Min.) $ 1,502.761,976.04
.
.
Item 17 Page 80 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 EffectiveEffective 07/01/1707/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 EffectiveEffective 07/01/1907/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2007/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2107/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveEffective 07/01/2207/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 EffectiveEffective 07/01/2307/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx EffectiveEffective 07/01/2307/01/26
Resolution No. 2015-26 Effective 07/01/16
Electric Meter Test: $
480.75587.30
(Refundable if meter in error greater than 2%)
Temporary Power Pole: $
1,229.762,114.36
Temporary Power Pole and Transformer Installation: $
3,334.887,037.38
.
.
Item 17 Page 81 of 205
Schedule D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. D
DOMESTIC SERVICE
APPLICABILITY
Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge ……………………………………………. $3.95 4.11
Facilities Charge…………………………………………….… $1.47 1.53
Energy Charge (to be added to Customer Charge):
All kWh, per kWh ………………………………... 10.4410.86¢
Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge. .
.
Item 17 Page 82 of 205
Schedule D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
2. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
3. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
4. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 83 of 205
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. GP
GREEN POWER
APPLICABILITY
Applicable to single- and three-phase general service, including lighting and power. This schedule is not applicable to customers enrolled in the following Electric Rate Schedules: Schedule No. TOU-D Domestic Service Schedule No. TOU PA-1 Power-Ag and Pumping Connect Load Basis Schedule No. TC-1 Traffic Control Service Schedule No. PA-TOU Power-Ag and Pumping TOU Schedule No. PA-2 Power-Ag and Pumping Demand Basis Schedule No. PA-1 Power-Ag and Pumping Connected Load Basis Schedule No. OL-1 Outdoor Area Lighting Schedule No. LS-2 Lighting-Street and Highway Customer-Owned Schedule No. LS-1 Lighting-Street and Highway Utility-Owned Schedule No. D Domestic Service.
TERRITORY
Within the city limits of the City of Vernon.
RATE
The Green Power electric rate schedule is developed to enable customers to pay an additional fee of
55.2¢ per kilowatt hour (kWh) to bring in a fixed amount of renewable energy that is purchased by the City of Vernon specifically for a customer, that is beyond the state mandated clean energy goals.
SPECIAL CONDITIONS
1. Customer enrollment in the Green Power electric rate schedule is strictly voluntary. The amount of Renewable Energy purchased by the City of Vernon, on behalf of the customer, shall be subject to Vernon Public Utilities approval and shall not exceed 100% of the customer’s annual energy consumption.
2. Customers enrolling in the Green Power electric rate schedule must receive Vernon Public Utilities approval on or before September 30th of a given calendar year.
3. Customers have the option to re-enroll or disenroll in the Green Power electric rate and must do so on or before September 30th of a given calendar year.
Authorized by the City of Vernon
Resolution No. 2025-020 Effective 8/19/25
Resolution No. 2026-xxx Effective 7/1/26
.
.
Item 17 Page 84 of 205
4. Once approved, the additional fee of 55.2¢ per kWh for the fixed amount of renewable energy that is purchased by the City of Vernon, on behalf of the customer, will take into effect at the start of the subsequent calendar year on January 1st.
5. Once a customer selects to enroll in the Green Power electric rate schedule, the customer must remain enrolled for the entire enrollment period of one calendar year, which starts January 1st and ends December 31st.
6. An eligible customer will be assigned a rate schedule to which it would otherwise be assigned to if the customer were not eligible under the Green Power electric rate schedule. All charges, terms and conditions under that rate schedule shall remain effective.
BILLING
1. The Department shall charge an additional fee of 55.2¢ per kWh consumed by the customer in accordance with the Department’s normal metering practice.
2. The customer shall be billed the additional fee of 55.2¢ per kWh and other applicable charges under the schedule assigned to it.
3. Each bill shall include a separate line item that delineates the additional fee of 55.2¢ per kWh, based on the customer’s monthly energy consumption information, along with the current balance owed to the utility, which is calculated based on the customer’s existing rate schedule.
4. In the event the customer disenrolls from the Green Power electric rate schedule prior to the end of the calendar year, the additional fee of 55.2¢ per kWh will continue to apply until the end of the same calendar year on December 31st.
5. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is
2.85 percent of the total bill before any special fees or charges.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
8. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
Authorized by the City of Vernon
Resolution No. . 2025-020 Effective 8/19/25
Resolution No. 2026-xxx Effective 7/1/26 .
.
Item 17 Page 85 of 205
Schedule No. GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 EffectiveE
ffective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 EffectiveE
ffective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 EffectiveE
ffective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
EffectiveE
ffective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. GS-1
GENERAL SERVICE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Summer Winter
Customer Charge ……………………………………… $ 58.2060.53 $ 58.2060.53 Facilities Charge ……………………………………… $ 22.0222.90 $ 22.0222.90 Energy Charge
All kWh, per kWh ……………………………… 25.55226.574¢
23.76324.714¢
Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge. .
.
Item 17 Page 86 of 205
Schedule No. GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 EffectiveE
ffective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 EffectiveE
ffective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 EffectiveE
ffective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
EffectiveE
ffective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to service separately an X-ray installation, the billing will be increased by $1.03 per kVA of transformer capacity requested.
3. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
4. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
5. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
6. Excess Transformer Capacity: The amount of transformer capacity requested by a customer which is in excess of the applicable standard transformer size determined by the Utility as required to serve the customer's measurable kilowatt demand. Excess transformer capacity shall be available to all customers under this schedule and shall be billed at $1.03 per kVA per month.
7. Seasons: The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time .
.
Item 17 Page 87 of 205
Schedule No. GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 EffectiveE
ffective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 EffectiveE
ffective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 EffectiveE
ffective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 EffectiveE
ffective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
EffectiveE
ffective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
8. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
9. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
10. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 88 of 205
Schedule No. GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. GS-2
GENERAL SERVICE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
This schedule is not applicable to customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use recording meters have been installed.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Per Meter
Per Month
Demand Charge:
All kW of billing demand, per kW*……………………………. $ 29.9031.10 Energy Charge (to be added to Demand Charge):
All kWh, per kWh…..………………………………………… 13.6014.14¢
*(Subject to Contract Demand. See Special Condition No. 9.) .
.
Item 17 Page 89 of 205
Schedule No. GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Minimum Charge:
The Demand Charge plus the Energy Charge shall be subject to a monthly minimum charge of $279.78290.97.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW.
3.2. 4.3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute interval in the month.
4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
.
.
Item 17 Page 90 of 205
Schedule No. GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to serve separately an X-Ray installation, the minimum charge will be increased by $1.03 per kVA of transformer capacity requested.
7. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
9. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who .
.
Item 17 Page 91 of 205
Schedule No. GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the kilowatt demand, whichever is less and is expressed in kilowatts.
10. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
13. Recording Meters: A recording-type meter shall be installed for all customers purchasing under this schedule and having peak requirements of 500 kW or more. Customers having recording-type meters are not eligible to purchase under this schedule and must be transferred to Schedule No. TOU-V.
14. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation. .
.
Item 17 Page 92 of 205
Schedule No. GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
15. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
16. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 93 of 205
Schedule No. LS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. LS-1
LIGHTING-STREET AND HIGHWAY
UTILITY-OWNED SYSTEM
APPLICABILITY
Applicable to street and highway lighting service supplied from overhead lines where the Utility owns and maintains the street lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Energy Curtailment Service
Lamp SizeLumens
All Night Service
Per Lamp Per
Month
Midnight or
Equivalent Service
Per Lamp Per
Month
Facilities Charge
Per Lamp Per
Month
High Pressure Sodium Vapor Lamps
5,800 Lumens $19.3620.13 $18.0518.77 $13.3513.88
9,500 Lumens 22.4423.34 20.0620.86 13.7214.27
.
.
Item 17 Page 94 of 205
Schedule No. LS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
16,000 Lumens 28.0529.17 24.3425.31 14.9715.57
22,000 Lumens 32.8234.13 27.8428.95 15.8316.46
25,500 Lumens 35.8737.30 29.9931.19 15.9416.58
47,000 Lumens 50.7352.76 40.4342.05 16.7117.38
.
.
Item 17 Page 95 of 205
Schedule No. LS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Standard Equipment Furnished: Bracket or mast arm construction will be furnished. Where feasible with existing facilities, center suspension construction may be furnished. Enclosed luminaires will be furnished for lamps of 2,500 lumens, or larger, and open reflector lighting units will be furnished for lamps of 1,000 lumens. Such standard lighting equipment will be attached to wood poles.
2. Other than Standard Equipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in cost installed between such equipment and standard equipment. Advances made in connection with such agreements become and remain the sole property of the Utility; as do the said equipment.
3. Hours of Service: Under the Utility's standard all night operating schedule approximately 4,140 hours of service per year will be furnished.
4. Removal or Modification of Equipment: Where street lighting service and facilities were ordered removed or modified by a customer and such services and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of such reinstallation a nonrefundable amount equal to the cost of removal or modification of the prior facilities and the estimated cost of such reinstallation. Facilities removed or installed remain the sole property of the Utility.
5. Energy Curtailment Service:
.
.
Item 17 Page 96 of 205
Schedule No. LS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
a. Where the Customer requests the installation and/or removal of equipment in order to obtain Energy Curtailment Service, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to the Utility the estimated installation cost for any additional equipment required and/or the removal cost of any equipment currently installed. Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years.
Facilities installed in connection with such request become and remain the sole property of the Utility.
b. Under the Utility's midnight (PST) or equivalent service operating schedule, approximately 2,090 hours of service per year will be furnished.
c. Facilities charges shall be applicable under this schedule only when the Utility has been requested to discontinue the existing service by the customer and the customer has stipulated that the facilities are to be left in place for future use.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
8. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment .
.
Item 17 Page 97 of 205
Schedule No. LS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
9. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 98 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. LS-2
LIGHTING-STREET AND HIGHWAY
CUSTOMER-OWNED INSTALLATION
APPLICABILITY
Applicable to service for the lighting of streets, highways, other public thoroughfares, and publicly-owned and publicly-operated automobile parking lots which are open to the general public, where the customer owns the street lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
RATE A-UNMETERED SERVICE: Per Month
_________________________________________________________________________________________________________________________________________________________________________________________________ All Night Service Midnight Service
Multiple Series Multiple Series
For each kW of lamp load, per kW $65.0867.68 $84.5887.96 $37.8839.40 $47.84 RATE B-METERED SERVICE: Per Meter
Meter Charge: Per Month
Multiple Service ……………………. $ 11.2411.69
Series Service ……………………. $ 29.9231.12
.
.
Item 17 Page 99 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Energy Charge (to be added to Meter Charge):
All kWh, per kWh ……………………. 18.90019.656¢
RATE C-MAINTENANCE SERVICE-OPTIONAL:
In addition to the Rate A or Rate B charges.
.
.
Item 17 Page 100 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Lamp Rating
Lumens
Per Lamp
Lamp Type Per Month
1,000* Incandescent Extended Service ……………………………… $0.74 77 2,500* Incandescent Extended Service ……………………………… $0.83 86 4,000* Incandescent Extended Service ……………………………… $0.87 90 6,000* Incandescent Extended Service ……………………………… $0.92 96 10,000* Incandescent Extended Service ……………………………… $0.991.03 3,500* Mercury Vapor ……………………………… $0.80 83
7,000* Mercury Vapor ……………………………… $0.74 77
11,000* Mercury Vapor ……………………………… $0.87 90
20,000* Mercury Vapor ……………………………… $0.80 83
35,000* Mercury Vapor ……………………………… $1.201.25
55,000* Mercury Vapor ……………………………… $1.081.12
5,800 High Pressure Sodium Vapor ……………………………… $1.741.81 9,500 High Pressure Sodium Vapor ……………………………… $1.741.81 16,000 High Pressure Sodium Vapor ……………………………… $1.711.78 22,000 High Pressure Sodium Vapor ……………………………… $1.721.79 25,500 High Pressure Sodium Vapor ……………………………… $1.721.79 47,000 High Pressure Sodium Vapor ……………………………… $1.761.83
SPECIAL CONDITIONS
1. Ownership of Facilities:
a. For multiple systems, the Utility will deliver service 120/240 volt overhead circuits. For series systems the Utility will furnish and maintain constant current regulating transformers and deliver service at the secondary side of such transformers.
b. The customer will furnish and maintain all utilization equipment beyond the point of delivery except for maintenance service provided by the Utility in accordance with Special Condition 3.
.
.
Item 17 Page 101 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
c. Meter locations for multiple systems shall be at points mutually agreed upon.
Meter locations for series systems shall be on the primary supply circuit to the constant current regulating transformer at a point acceptable to the Utility. *Closed to new installation as of November 1, 1997
.
.
Item 17 Page 102 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
2. Lamp Load: The lamp load for regular (general purpose) multiple incandescent lamps shall be the manufacturers' lamp rating in watts.
The lamp load in watts for lumen rated street lighting lamps shall be as follows:
MERCURY
VAPOR
HIGH
PRESSURE
SODIUM
PRESSURE
INCANDESCENT
_________________MULTIPLE_____________
_
____________SERIES____________
GROUP
GROUP EXTEND
ED
REPLACEMEN
T
EXTENDE
D
LUMENS REGULA
R
REPLACEMEN
T
SVS. REGULAR SVC. SVS. MULT.
.
SERIE
S
Watts Watts Watts Watts Watts Watts Watts Watts Watt
s
600* 55 58 -- 42 45 -- -- -- --
800* -- -- -- 57 -- -- -- -- --
1000* 85 92 103 62 65 73 -- -- --
2500* 175 189 202 143 152 164 -- -- --
3500* -- -- 327 -- -- -- 125 -- --
4000* 268 295 -- 210 -- 251 -- -- --
5800* -- -- -- -- 220 -- -- 82 85
6000* 370 405 448 310 325 364 -- -- --
7000* -- -- -- -- -- -- 208 -- --
9500 -- -- -- -- -- -- -- 140 121
10000* 575 620 690 525 558 605 -- -- --
11000* -- -- -- -- -- -- 292 -- --
15000* 800 860 -- 755 822 -- 447 -- --
16000 -- -- -- -- -- -- -- 202 174
20000* -- -- -- -- -- -- 447 -- --
22000 -- -- -- -- -- -- -- 248 233
25000* -- -- -- 1,275 -- -- -- -- --
25500 -- -- -- -- -- -- -- 320 --
.
.
Item 17 Page 103 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
35000* -- -- -- -- -- -- 753 -- --
47000 -- -- -- -- -- -- -- 485 --
55000* -- -- -- -- -- -- 1,058 -- --
Total lamp load shall be determined to the nearest 1/10 kW. *Closed to new installation as of November 1, 1997.
.
.
Item 17 Page 104 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
3. Maintenance Service: Maintenance service furnished by the Utility under Rate C for the lamps specified shall include the following:
a. Renewal of lamps after the original installation by the customer. b. Regular inspection.
c. Periodic cleaning of globes.
d. Labor of replacing lamps and globes.
Incandescent lamps furnished under this provision will be extended service lamps only. Mercury vapor lamps and high pressure sodium vapor lamps furnished under this provision will be as specified by the Utility. Globes for renewal shall be furnished by the customer. Maintenance service will be furnished only where, in the opinion of the Utility, no undue hazard or expense will result because of location, mounting height, or other reasons.
4. Switching Facilities: For all night or midnight (Pacific Standard Time) service under the Utility's standard operating schedules, the Utility will furnish, maintain, and operate the necessary switching facilities. For other operating schedules, the customer shall furnish, maintain, and operate switching facilities as specified by the Utility and take metered service under Rate B.
5. Hours of Service: Under the Utility's standard all night operating schedule, approximately 4,140 hours of service per year will be furnished and under the Utility's standard midnight (Pacific Standard Time) operating schedule approximately 2,090 hours of service per year will be furnished.
6. Removal of Equipment: Where street lighting service and facilities were ordered removed by a customer and such service and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove, the customer shall pay to the Utility in advance of reinstallation a nonrefundable .
.
Item 17 Page 105 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
amount equal to the cost of removal of the prior facilities and the estimated cost of such reinstallation. Utility-owned facilities removed or installed remain the sole property of the Utility.
.
.
Item 17 Page 106 of 205
Schedule No. LS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
7. Energy Curtailment Service: Where the customer requests the installation and/or removal of equipment in order to curtail energy requirements, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to Utility the estimated cost installed or any additional equipment required and/or the removal cost of any equipment currently installed.
Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years.
Facilities installed in connection with such requests become and remain the sole property of the Utility.
8. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
9. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
10. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
11. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 107 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
172026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. OL-1
OUTDOOR AREA LIGHTING SERVICE
APPLICABILITY
Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
LUMINAIRE CHARGE:
Energy Curtailment Service
Midnight or
All Night Service Equivalent Service Facilities Charge
Lamp Size-Lumens Per Lamp Per Month Per Lamp Per Month Per Lamp Per Month High-Pressure Sodium
Vapor Lamps
.
.
Item 17 Page 108 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
172026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
5,800 Lumens $20.0020.80 $18.8219.57
$13.4513.99
9,500 Lumens $23.4224.36 $21.2622.11
$13.8514.40
22,000 Lumens $34.9636.36 $30.1731.38
$15.9416.58
POLE CHARGE (to be added to Luminaire Charge): Per Pole Per Month
For each additional new wood pole installed: $6.486.74
SPECIAL CONDITIONS
1. Hours of Service: Area all night lighting service will be furnished from dusk to dawn, approximately 4,140 hours per year, by Utility-owned luminaires supplied from the Utility's existing 120/240 volt overhead circuits and mounted on existing Utility-owned wood poles as standard equipment.
2. Other Than Standard Equipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in installation cost installed between such equipment and standard equipment.
Advances made for this purpose will not be refunded. Facilities installed in connection with such agreements become and remain the sole property of the Utility. Utility will provide customer with adjusted per lamp charges and customer will pay such charges.
.
.
Item 17 Page 109 of 205
Schedule OL-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
172026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
3. Service and Facilities Furnished: This service will be in accordance with Utility's specifications as to the equipment, installation, maintenance, and operation.
4. Replacement of Lamps: The Utility will replace lamps on a scheduled basis, and individual lamps will be replaced upon service failure, as soon as practical after notification by customer, subject to Utility's operating schedules.
5. Contract: A written contract for a term of three year will be required by the Utility when service is first established under this schedule.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
8. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
9. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council. .
.
Item 17 Page 110 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-1
POWER-AGRICULTURAL AND PUMPING
CONNECTED LOAD BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes or for general water or sewerage pumping.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Horsepower of
Connected Load Monthly Service Charge
Per Meter Per Meter Per hp
2 and over ………………………………………… $ 2.632.74
Facilities Charge ………………………………………… $18.77 19.52
Energy Charge to be added to Service Charge-Rate
.
.
Item 17 Page 111 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
All kWh, per kWh ………………………………………… 24.51825.499¢
Minimum Charge: The monthly minimum charge shall be the monthly Service Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard power voltage.
2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service. The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt-ampere input capacity of other equipment, with each kilovolt-ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information.
3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be .
.
Item 17 Page 112 of 205
Schedule PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
determined by the Utility or upon notification by the customer of a permanent change in operating conditions.
4. Temporary Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made.
5. In-Lieu Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
7. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
8. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 113 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-2
POWER-AGRICULTURAL AND PUMPING
DEMAND BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Demand Charge:
First 75 kW or less of billing demand $1,342.651,396.36 All excess kW of billing demand, per kW $17.9018.62
Energy Charges (to be added to Demand Charge):
All kWh per kWh 18.84219.596¢
Minimum Charge:
.
.
Item 17 Page 114 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
The monthly minimum charge shall be the monthly Demand Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 50% of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 75 kW. Billing demand shall be determined to the nearest kW. .
.
Item 17 Page 115 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month.
Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
4. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatthours. Demand in kilowatts and kilovars shall be determined to the nearest unit.
A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
5. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
6. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. .
.
Item 17 Page 116 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer’s load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
.
.
Item 17 Page 117 of 205
Schedule PA-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
9. Contract Demand: A contract demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule.
Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
10. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
11. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
12. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 118 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. PA-TOU
POWER-AGRICULTURAL AND PUMPING
TIME-OF-USE
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is elective for customers with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge
$1,361.4
91,415.95
Automated Meter Reading (AMR) Meter Charge ($/Mo) $15.6716.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW $ 31.4132.67 .
.
Item 17 Page 119 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Plus all kW of mid-peak maximum billing demand, per kW $ 4.875.06 Plus all kW of off-peak billing demand, per kW No
Charge*
Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh 9.72010.109¢
Plus all mid-peak kWh, per kWh 9.1119.475¢
Plus all off-peak kWh, per kWh 8.2018.529¢
*(Subject to Minimum Demand Charge. See Special Condition No. 11.) .
.
Item 17 Page 120 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak: 1:00 p.m. to 7:00 p.m.
Summer Weekdays except holidays
5:00 p.m. to 10:00 p.m.
Winter weekdays except holidays
Mid-Peak 9:00 a.m. to 1:00 p.m. and
7:00 p.m. to 11:00 p.m.
Summer weekdays except holidays
8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak: All other hours:
Off-Peak Holidays are: New Year's Day (January 1),
Washington's Birthday (third Monday in February),
Memorial Day (last Monday in May), Independence Day
(July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
.
.
Item 17 Page 121 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 25% of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 50 kW.
Billing demand shall be determined to the nearest kW.
4. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
.
.
Item 17 Page 122 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
6. Temporary Discontinuance of Service: Where the use of energy seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
7. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
8. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
9. Excess Transformer Capacity: The transformer capacity in excess of a customer’s contract demand which is either required by the Utility because of the nature of the customer’s load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
.
.
Item 17 Page 123 of 205
Schedule PA-TOU
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15 Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
10. Contract Demand: A contract demand will be established by the Utility, based on applicant’s demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule.
Contract demand is based upon the nominal kilovolt-ampere rating of the Utility’s serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer’s stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
11. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
12. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
13. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 124 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TC-1
TRAFFIC CONTROL SERVICE
APPLICABILITY
Applicable to single-phase service for traffic-directional signs or traffic-signal systems located on streets, highways and other public thoroughfares and to railway crossing and track signals.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge: ……………………………………. $11.84
12.31 Energy Charge (to be added to Customer Charge):
All kWh, per kWh ……………………………………. 21.86022.734¢
Minimum Charge: The monthly minimum charge shall be
the monthly Customer Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage not in excess of 240 volts or, at the option of the Utility, at 240/480 volts, three-wire, single-phase. .
.
Item 17 Page 125 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
2. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
4. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
5. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 126 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU GS-1
GENERAL SERVICE
APPLICABILITY
Applicable to single and three-phase general service including lighting and power. Service under this schedule is elective for all customers taking service under Schedule GS-1. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept Nov. thru April
Customer Charge $58.2060.53 $58.2060.53 $58.2060.53
Facilities Charge $22.0222.90 $22.0222.90 $22.0222.90
Meter Charge $15.5516.17 $15.5516.17 $15.5516.17
Energy Charge:
All on-peak kWh, per kWh 35.09236.496¢ 57.77360.084¢ 23.15524.081¢ Plus all mid-peak kWh, per kWh 24.71425.703¢ 30.84532.079¢ 22.13023.015¢ Plus all off-peak kWh, per kWh 18.62219.367¢ 22.47823.377¢ 18.56119.303¢ Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge. .
.
Item 17 Page 127 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m.
November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to service separately an X-ray installation, the billing will be increased by $1.03 per kVA of transformer capacity requested.
4. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
5. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. .
.
Item 17 Page 128 of 205
Schedule TOU GS-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
7. Excess Transformer Capacity: The amount of transformer capacity requested by a customer which is in excess of the applicable standard transformer size determined by the Utility as required to serve the customer's measurable kilowatt demand. Excess transformer capacity shall be available to all customers under this schedule and shall be billed at $1.03 per kVA per month.
8. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
9. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
10. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 129 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU GS-2
GENERAL SERVICE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
Service under this schedule is elective for all customers taking service under Schedule GS-2. This schedule is not applicable to customers with demands of 500 kW or higher for any three months during the preceding twelve. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Meter Charge $37.1438.63 $37.1438.63 $37.1438.63
Demand Charge (per kW): $29.9031.10 $29.9031.10 $29.9031.10
Energy Charge:
All on-peak kWh, per kWh 14.94215.540¢ 17.80018.512¢ 15.49116.111¢ Plus all mid-peak kWh, per kWh 14.35714.931¢ 15.79316.425¢ 14.22214.791¢ Plus all off-peak kWh, per kWh 11.12111.566¢ 12.69213.200¢ 12.29212.784¢ *(Subject to Contract Demand. See Special Condition No. 9.) Minimum Charge:
The Demand Charge plus the Energy Charge shall be subject to a monthly minimum charge of $239.16248.73.
.
.
Item 17 Page 130 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
3. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW.
4. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW.
5. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute interval in the month.
.
.
Item 17 Page 131 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
6. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
7. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
8. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to serve separately an X-Ray installation, the minimum charge will be increased by $1.03 per kVA of transformer capacity requested.
9. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued.
10. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month.
.
.
Item 17 Page 132 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
11. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the kilowatt demand, whichever is less and is expressed in kilowatts.
12. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
13. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
14. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
15. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
16. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
.
.
Item 17 Page 133 of 205
Schedule TOU GS-2
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
17. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 134 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU PA-1
POWER-AGRICULTURAL AND PUMPING
CONNECTED LOAD BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes or for general water or sewerage pumping. Service under this schedule is elective for all customers taking service under Schedule PA-1. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Customer Charge (per Horse Power of Connected Load) $8.088.40 $8.088.40 $8.088.40 Facilities Charge $18.4119.15 $18.4319.17
$18.4319.17
Meter Charge $36.2437.69 $36.2437.69
$36.2437.69
.
.
Item 17 Page 135 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
Demand Charge:
Energy Charge:
All on-peak kWh, per kWh 34.81236.204¢ 57.82560.138¢
22.702
23.610¢
Plus all mid-peak kWh, per kWh 24.28325.254¢ 30.50331.723¢
21.662
22.528¢
Plus all off-peak kWh, per kWh 18.10218.826¢ 22.01522.896¢
18.040
18.762¢
Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. .
.
Item 17 Page 136 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
Time Period:
1. Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m.
November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard power voltage.
3. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service. The rated capacity of the .
.
Item 17 Page 137 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt-ampere input capacity of other equipment, with each kilovolt-ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information. .
.
Item 17 Page 138 of 205
Schedule TOU PA-1
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/170
7/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/190
7/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/200
7/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/210
7/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/220
7/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/230
7/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
xx2026-
xx
Effective
Effective
07/01/230
7/01/26
Resolution No. 2015-26 Effective 07/01/16
4. Overload Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be determined by the Utility or upon notification by the customer of a permanent change in operating conditions.
5. Temporary Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load.
Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made.
6. In-Lieu and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is
2.85 percent of the total bill before any special fees or charges.
8. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
9. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 139 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-D
DOMESTIC SERVICE
APPLICABILITY
Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation. Service under this schedule is elective for all customers taking service under Schedule D. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept. Nov. thru April
Customer Charge $3.964.12 $3.964.12 $3.964.12
Facilities Charge $1.471.53 $1.471.53 $1.471.53
Meter Charge $6.757.02 $6.757.02 $6.757.02
Energy Charge:
All on-peak kWh, per kWh 32.62033.925¢ 32.50533.805¢ 7.7038.011¢ .
.
Item 17 Page 140 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Plus all mid-peak kWh, per kWh 7.7038.011¢ 7.7038.011¢ 7.7038.011¢ Plus all off-peak kWh, per kWh 7.7038.011¢ 7.7038.011¢
7.7038.
011¢
The monthly minimum charge shall be the monthly Customer Charge.
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). .
.
Item 17 Page 141 of 205
Schedule No. TOU-D
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26 Effective 07/01/15
Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m.
November 1 and continue through April 30 of the following year.
2. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is
2.85 percent of the total bill before any special fees or charges.
4. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
5. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council.
.
.
Item 17 Page 142 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-G
GENERAL SERVICE-LARGE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
Service under this schedule is elective for customers served under Schedule No. GS-2 with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is elective for all existing customers with time of use metering who have been taking service under Schedule TOU-V with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding 12 months. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept Nov. thru Aprill
Customer Charge $1361.491,415.95 $1361.491,415.95
$1361.491,415.95
Automated Meter Reading (AMR) Meter Charge ($/Mo) $15.6716.30 $15.6716.30 $15.6716.30
Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW $28.8329.98 $34.0835.44 $28.8329.98
Plus all kW of mid-peak maximum billing demand, Per kW $5.295.50 $5.295.50 $5.295.50 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge*
Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh 9.91210.308¢ 12.35512.849¢
9.91210.308¢
Plus all mid-peak kWh, per kWh 9.2889.660¢ 11.73412.203¢
9.2889.660¢
.
.
Item 17 Page 143 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
Plus all off-peak kWh, per kWh 8.3558.689¢ 9.6210.0094¢
8.3558.689¢
*(Subject to Minimum Demand Charge. See Special Condition No. 9.) .
.
Item 17 Page 144 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, midpeak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
.
.
Item 17 Page 145 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; and by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter.
b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatthours. Demand in kilowatts and kilovars shall be determined to the nearest unit.
A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinue, will be required to pay all charges which would have been billed if service had not been discontinued.
.
.
Item 17 Page 146 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
14. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
.
.
Item 17 Page 147 of 205
Schedule TOU-G
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/17 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2019-07 Effective 07/01/19 Resolution No. 2012-98 Effective 07/01/12 Resolution No. 2019-07 Effective 07/01/20 Resolution No. 2012-98 Effective 01/01/13 Resolution No. 2019-07 Effective 07/01/21 Resolution No. 2012-98 Effective 07/01/13 Resolution No. 2019-07 Effective 07/01/22 Resolution No. 2014-30 Effective 07/01/14 Resolution No. 2023-13 Effective 07/01/23 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2015-26 Effective 07/01/16
15. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council. .
.
Item 17 Page 148 of 205
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
CITY OF VERNON
GAS & ELECTRICPUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-I
GENERAL SERVICE-LARGE INTERRUPTIBLE
APPLICABILITY
This schedule is optional for all customers eligible for service under Schedule TOU-V who commit to curtail at least fifty percent (50%) of such customer’s maximum demand, which shall not be less than 7,500 kW per Period of Interruption.
In addition, the following conditions for eligibility shall apply:
1. Service Voltage must be greater than 50 kV; and
2. The customer’s Maximum Demand must be 12,500 kW or above; and
3. This schedule is in effect until suspended by the Vernon Gas & ElectricPublic Utilities Department when, in their judgment, there is no additional need for Interruptible Demand.
TERRITORY
Within the city limits of the City of Vernon.
RATES
All charges and provisions of schedule TOU-V shall apply as follows:
In accordance with the terms and conditions of this schedule the customer’s bill will be credited per the following rate schedule per kW month for all kW in excess of the customer’s specified Firm Demand Level. The on-peak and mid-peak bill credits will be based on the difference between the customer’s monthly average kW demand (for on-peak and for mid-peak periods, respectively) and the customer’s specified Firm Demand Level, where
.
.
Item 17 Page 149 of 205
Schedule TOU-I
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
Monthly Average On-Peak kW Demand = Total Monthly On-Peak kWh / Total Monthly OnPeak Hours Monthly Average Mid-Peak kW Demand = Total Monthly Mid-Peak kWh / Total Monthly Mid-Peak Hours.
Rate Schedule
Interruption Capacity Credits ($/kW-month)
Summer Winter
May, June, Oct July, August, Sept Nov, thru April
On-Peak 4.56 13.65 0.26
Mid-Peak 2.24 6.21 0.59
Charges for Excess Demand may apply under certain conditions, as provided in Special Condition 8.
SPECIAL CONDITIONS
1. Interruptible Demand: The Interruptible Demand shall be the measured difference between the customer’s demand, at the time of interruption, and the customer’s Firm Demand Level. During a Period of Interruption, customer is expected to interrupt load such that it uses no more electricity than its specified Firm Demand Level.
2. Firm Demand Level: The Firm Demand Level is the Maximum Demand the Department is expected to supply during a Period of Interruption.
3. Excess Demand: The Excess Demand shall be the average kW demand measured which exceeds the Firm Demand Level during each Period of Interruption. The average kW demand is the total kWh recorded divided by total hours of interruption during each Period of Interruption.
4. Interruptible Service Agreement: To receive interruptible service under this schedule a customer shall sign an agreement for a specified term and Firm Demand Level. Eligible customers shall comply with all the provisions of their respective Agreements.
.
.
Item 17 Page 150 of 205
Schedule TOU-I
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2015-26 Effective 07/01/15 Resolution No. 2011-112 Effective 01/01/12 Resolution No. 2026-xx Effective 07/01/26 Resolution No. 2012-98 Effective 07/01/12
Resolution No. 2012-98 Effective 01/01/13
Resolution No. 2012-98 Effective 07/01/13
Resolution No. 2014-30 Effective 07/01/14
5. Notice of Interruption: The Department will give the customer a minimum thirty (30) minutes notice of a Period of Interruption to enable the customer to disconnect the necessary load to prevent Excess Demand. Communication procedures shall be specified in the Interruptible Service Agreement.
6. Period of Interruption: A Period of Interruption shall be an interval which commences thirty minutes after Notice of Interruption and which ends upon notification from the Department, during which time the customer will be required to disconnect sufficient load to reduce the demand on the system to the Firm Demand Level. A Period of Interruption can occur:
a. Upon the notification from the Independent System Operator (ISO) requiring the Department to shed load, or
b. Upon the unscheduled outage of the Malburg Generating Station or any other generating unit internal to the Department system.
7. Frequencies and Duration of Interruption: The Periods of Interruption will not exceed ten (10) instances per month or twenty-four per year nor last longer than twelve (12) consecutive hours in any single instance.
8. Excess Demand Charge: Upon the first occurrence of Excess Demand during a Period of Interruption, such Excess Demand shall be billed at $14.20 per kW.
Upon the second occurrence of Excess Demand during a Period of Interruption, such Excess Demand shall be billed at $21.30 per kW.
Upon the third occurrence of Excess Demand during a Period of Interruption, within the same twelve (12) month period, the customer will be disqualified from further interruptible rate service.
9. Verification of Ability to Interrupt: Interruptible Rate Service customers shall periodically be required to demonstrate ability and willingness to disconnect all load except the specified Firm Demand Level within a Notice of Interruption Period. Testing procedures for such verification shall be specified in the Interruptible Service Agreement terms. .
.
Item 17 Page 151 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-V
GENERAL SERVICE-LARGE
APPLICABILITY
This schedule is applicable for all customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed.
TERRITORY
Within the city limits of the City of Vernon.
RATES
PER METER PER MONTH
Summer Winter
May, June, Oct. July, August, Sept. Nov. thru April
Customer Charge $1361.491,415.95 $1361.491,415.95 $1361.491,415.95 Automated Meter Reading (AMR) Meter Charge ($/Mo) $15.6716.30 $15.6716.30 $15.6716.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW. . . . $30.0931.29 $36.7538.22 $23.8524.80 Plus all kW of mid-peak maximum billing demand, per kW $5.705.93 $5.705.93 $5.705.93 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge* .
.
Item 17 Page 152 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . . . . . 9.5709.953¢ 12.02612.507¢ 9.5709.953¢ Plus all mid-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . 8.9549.312¢ 11.41011.866¢ 9.3128.954¢ Plus all off-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . 8.3588.037¢ 9.2919.663¢ 8.3588.037¢ *(Subject to Minimum Demand Charge. See Special Condition No. 9.)
.
.
Item 17 Page 153 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring .
.
Item 17 Page 154 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
.
.
Item 17 Page 155 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; and by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to .
.
Item 17 Page 156 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
.
.
Item 17 Page 157 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges.
11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay .
.
Item 17 Page 158 of 205
Schedule TOU-V
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution
No.Resolution
No.
2015-
262015-
26 Effective
Effective
07/01/17
07/01/16
Resolution No. 2011-112 Effective 01/01/12
Resolution
No.Resolution
No.
2019-
072015-
26 Effective
Effective
07/01/19
07/01/17
Resolution No. 2012-98 Effective 07/01/12
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/20
07/01/19
Resolution No. 2012-98 Effective 01/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/21
07/01/20
Resolution No. 2012-98 Effective 07/01/13
Resolution
No.Resolution
No.
2019-
072019-
07 Effective
Effective
07/01/22
07/01/21
Resolution No. 2014-30 Effective 07/01/14
Resolution
No.Resolution
No.
2023-
132019-
07 Effective
Effective
07/01/23
07/01/22
Resolution No. 2015-26
Effective
07/01/15 Resolution
No.Resolution
No.
2023-
132026-
xx
Effective
Effective
07/01/23
07/01/26
Resolution No. 2015-26 Effective 07/01/16
to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation.
14. Energy Cost Adjustment: Energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Energy Cost Adjustment Billing Factor (ECABF Procedure) and the Energy Cost Adjustment Calculation Sheet ECA-1 that have been approved by the City Council.
15. Renewable Energy Cost Adjustment: Renewable energy cost adjustment charge will be assessed pursuant to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor (RECAF Procedure) and the Renewable Energy Cost Adjustment Calculation Sheet REC-1 that have been approved by the City Council. .
.
Item 17 Page 159 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
CITY OF VERNON
PUBLIC UTILITIES DEPARTMENT
Schedule No. TOU-Vt
GENERAL SERVICE-LARGE
APPLICABILITY
This schedule is applicable for all customers taking service at 66KV with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed.
TERRITORY
Within the city limits of the City of Vernon.
RATES
PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sept Nov. thru April
Customer Charge $1207.561,255.86 $1207.561,255.86 $1207.561,255.86 Automated Meter Reading (AMR) Meter Charge ($/Mo) $ 14.92 $15.6716.30 $15.6716.30 $15.6716.30 Demand Charge (to be added to Customer Charge):
All kW of on-peak maximum billing demand, per kW. . . . . . $27.2128.30 $33.2334.56 $21.5622.42 Plus all kW of mid-peak maximum billing demand, per kW $5.165.37 $5.165.37 $5.165.37 Plus all kW of off-peak billing demand, per kW No Charge* No Charge* No Charge* Energy Charge (to be added to Demand Charge):
All on-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . . . . . ... . 7.8548.168¢ 10.2649.869¢ 8.1687.854¢ Plus all mid-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . 7.6437.349¢ 9.7399.364¢ 7.6437.349¢ Plus all off-peak kWh, per kWh. . . . . . . . . . . . . . . . . . . .. . . 6.8596.595¢ 7.9307.625¢ 6.8596.595¢ *(Subject to Minimum Demand Charge. See Special Condition No. 9.)
.
.
Item 17 Page 160 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On-Peak Mid-Peak Off-Peak
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and All other hours:
Summer Weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used.
.
.
Item 17 Page 161 of 205
Schedule TOU-Vt
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83 Resolution No. 2026-13 Effective 07/01/26 Resolution No. 2019-07 Effective 07/01/19
Resolution No. 2019-07 Effective 07/01/20
Resolution No. 2019-07 Effective 07/01/21
Resolution No. 2019-07 Effective 07/01/22
Resolution No. 2023-13 Effective 07/01/23
4. Voltage Discount: The charges including adjustment will be reduced by 0% for service delivered and metered at voltages over 50 kV.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service.
Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued.
.
.
Item 17 Page 162 of 205
Schedule TOU-Vt