CITY OF VERNON
Sewer System Management Plan Update
Volume I
August 2026
Prepared by:

CITY OF VERNON
Department of Public Works
Engineering Division
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 2 of 50 ends

TABLE OF CONTENTS
ABBREVIATIONS /ACRONYMS ..................................................................................... 4 EXECUTIVE SUMMARY ................................................................................................... 5 PROHIBITIONS AND PROVISIONS ............................................................................... 6 I. PROHIBITIONS ................................................................................................................ 6 II. PROVISIONS .................................................................................................................... 6 ELEMENT 1. SSMP GOAL AND INTRODUCTION ...................................................... 9

1.1 COMPLIANCE SUMMARY .......................................................................................... 9

1.2 COMPLIANCE DOCUMENTS ................................................................................. 10

1.3 DOCUMENT DESCRIPTIONS .................................................................................. 10

1.3.1 Sanitary Sewer System Index Map (Appendix B) ............................................................ 10 ELEMENT 2. ORGANIZATION ...................................................................................... 11

2.1 COMPLIANCE SUMMARY ....................................................................................... 11

2.2 COMPLIANCE DOCUMENTS ................................................................................. 12

2.3 DOCUMENT DESCRIPTIONS .................................................................................. 12

2.3.1 City of Vernon Organizational Chart (Appendix C) ....................................................... 12

2.3.2 Public Works Organizational Chart (Appendix D) ........................................................ 12

2.3.3 Telephone Directory (Appendix E) ................................................................................... 12

2.3.4 LA County Fire Department Hazardous Materials Incident Procedures (Appendix F) .... 13

2.3.5 Sanitary Sewer Overflow Response Plan (Appendix G) .................................................... 13 ELEMENT 3. LEGAL AUTHORITY ............................................................................... 16

3.1 COMPLIANCE SUMMARY ....................................................................................... 16

3.2 COMPLIANCE DOCUMENTS ................................................................................. 18

3.3 DOCUMENT DESCRIPTIONS .................................................................................. 18

3.3.1 Municipal Code of the City of Vernon .............................................................................. 18

3.3.2 LACSD Industrial Waste Discharge Permit Requirements ............................................... 21

3.3.3 LACSD Wastewater Ordinance ......................................................................................22

3.3.4 Standard Specifications for Public Works Construction (Greenbook) ...................................22

3.3.5 Sanitary Sewer Overflow Response Plan (Appendix G) .....................................................22

3.3.6 City of Vernon Standard Drawings (Appendix H) ...........................................................23

3.3.7 Los Angeles County Department of Public Works Standard Drawings (Appendix I).........23 ELEMENT 4. OPERATION AND MAINTENANCE PROGRAM .............................. 24

4.1 COMPLIANCE SUMMARY ........................................................................................24

4.2 COMPLIANCE DOCUMENTS ..................................................................................25

4.3 DOCUMENT DESCRIPTIONS ...................................................................................26

4.3.1 Sanitary Sewer System Index Map (Appendix B) .............................................................26

4.3.2 Sanitary Sewer Overflow Response Plan (Appendix G) .....................................................26

4.3.3 Sewer and Storm Drain Programmed Maintenance System (Appendix J) .......................... 26 ELEMENT 5. DESIGN AND PERFORMANCE PROVISIONS ................................... 27

5.1 COMPLIANCE SUMMARY ........................................................................................27

5.2 COMPLIANCE DOCUMENTS ..................................................................................28

5.3 DOCUMENT DESCRIPTIONS ...................................................................................28

5.3.1 City of Vernon Standard Drawings (Appendix H) ...........................................................28

5.3.2 Los Angeles County Department of Public Works Standard Drawings (Appendix I) ........28 City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 3 of 50 ends

5.3.3 Municipal Code of the City of Vernon .............................................................................. 29

5.3.4 Standard Specifications for Public Works Construction (Greenbook) .................................. 29 ELEMENT 6. SPILL EMERGENCY RESPONSE PLAN .............................................. 30

6.1 COMPLIANCE SUMMARY ....................................................................................... 30

6.2 COMPLIANCE DOCUMENTS ................................................................................. 32

6.3 DOCUMENT DESCRIPTION .................................................................................... 32

6.3.1 Sanitary Sewer Overflow Response Plan (Appendix G) .................................................... 32 ELELMENT 7. SEWER PIPE BLOCKAGE CONTROL PROGRAM ........................... 34

7.1 COMPLIANCE SUMMARY ....................................................................................... 34

7.2 COMPLIANCE DOCUMENTS ................................................................................. 36

7.3 DOCUMENT DESCRIPTIONS .................................................................................. 37

7.3.1 City of Vernon Standard Drawings (Appendix H) ......................................................... 37

7.3.2 Los Angeles County Department of Public Works Standard Drawings (Appendix I) ........ 37

7.3.3 Public Outreach for FOG Control (Appendix K) ............................................................. 37

7.3.4 Sanitary Sewer System Hotspot Maps and List (Appendix L) ......................................... 38

7.3.5 Independent Collection/Disposal Service Vendor List (Appendix M) ................................ 38

7.3.6 Municipal Code of the City of Vernon .............................................................................. 38

7.3.7 LACSD Wastewater Ordinance ..................................................................................... 38

7.3.8 Standard Specifications for Public Works Construction (Greenbook) .................................. 39 ELEMENT 8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS ............................................................................................................ 40

8.1 COMPLIANCE SUMMARY ....................................................................................... 42

8.2 COMPLIANCE DOCUMENTS ................................................................................. 42

8.3 DOCUMENT DESCRIPTIONS .................................................................................. 43

8.3.1 2008 Sewer System Hydraulic Analysis (Appendix N) ................................................... 43 ELEMENT 9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS ............................................................................................................................................ 44

9.1 COMPLIANCE SUMMARY ....................................................................................... 44

9.2 COMPLIANCE DOCUMENTS ................................................................................. 46

9.3 DOCUMENT DESCRIPTIONS .................................................................................. 46

9.3.1 Sanitary Sewer Overflow Response Plan (Appendix G) .................................................... 46

9.3.2 Sanitary Sewer System Hotspot Maps and List (Appendix L) ......................................... 46 ELEMENT 10. INTERNAL AUDITS .............................................................................. 47

10.1 COMPLIANCE SUMMARY ....................................................................................... 47

10.2 COMPLIANCE DOCUMENTS ................................................................................. 48

10.3 DOCUMENT DESCRIPTIONS .................................................................................. 48 ELEMENT 11. COMMUNICATION PROGRAM .......................................................... 49

11.1 COMPLIANCE SUMMARY ....................................................................................... 49

11.2 COMPLIANCE DOCUMENTS ................................................................................. 49

11.3 DOCUMENT DESCRIPTIONS .................................................................................. 50 NOTE: APPENDICES ARE LOCATED IN VOLUME II OF THIS PLAN.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 4 of 50 ends

ABBREVIATIONS /ACRONYMS
BMP Best Management Practice
CMMS Computerized Maintenance Management System
CMOM Capacity, Management, Operations and Maintenance
CIP Capital Improvement Program
CWEA California Water Environment Association
ECS Environmental Compliance Services
EDU Equivalent Dwelling Unit
FOG Fats, Oils, Grease
GIS Geographical Information System
IEC Infrastructure Engineering Corporation
I/I Inflow / Infiltration
LACSD Sanitation Districts of Los Angeles County
MRP Monitoring and Reporting Plan
NPDES National Pollution Discharge Elimination System
OERP Overflow Emergency Response Plan
O&M Operation and Maintenance
PM Preventative Program
PVC Polyvinyl Chloride
RA&S Regional Assets and Services Department
SSMP Sewer System Management Plan
SSO Sanitary Sewer Overflows
SWRCB State of California Water Resources Control Board WDR Waste Discharge Requirements
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 5 of 50 ends

EXECUTIVE SUMMARY
On December 6, 2022, the State Water Resources Control Board (SWRCB) adopted Order No.

WQ 2022-0103-DWQ, a General Waste Discharge Requirement (WDR) for all publicly owned sanitary sewer collection systems in California with more than one (1) mile of sewer pipe. This General Order serves as statewide waste discharge requirements and supersedes the previous SWRCB Order No. 2006-0003-DWQ and amendments thereafter. The goal of Order No. WQ 2022-0103-DWQ is to provide a consistent statewide approach for reducing Sanitary Sewer Overflows (SSOs) by requiring to:

1. Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;

2. Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in the General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;

3. Proactively operate and maintain resilient sanitary sewer systems to prevent spills;

4. Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;

5. Monitor, track, and analyze spills for ongoing system-specific performance improvements; and

6. Report noncompliance with the General Order per reporting requirements.

The critical component of Order No. WQ 2022-0103-DWQ is the development of a Sewer System Management Plan (SSMP). There are eleven specific elements required in the WDR. The eleven milestones, and the applicable schedule for the City, include:

1. Sewer System Management Plan Goal and Introduction

2. Organization

3. Legal Authority

4. Operation and Maintenance Program

5. Design and Performance Provisions

6. Spill Emergency Response Plan

7. Sewer Pipe Blockage Control Program

8. System Evaluation, Capacity Assurance and Capital Improvements

9. Monitoring, Measurement, and Program Modifications

10. Internal Audits

11. Communication Program
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 6 of 50 ends

PROHIBITIONS AND PROVISIONS
The State Water Resources Control Board (SWRCB) Order No. WQ 2022-0103-DWQ mandates that the City of Vernon (City) comply with the following discharge prohibitions and provisions.

I. PROHIBITIONS
To meet the provisions contained in Division 7 of the California Water Code and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations adopted thereunder, the City is required to comply with the following prohibitions:
o Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required.
o Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited. o Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.

In any enforcement action, the Regional Board will consider the efforts of the City to contain, control, clean up and mitigate sewage spills from its collection system in accordance with Section 13327 of the California Water Code. The City will make every effort to contain sewage spilled from its collection systems and to prevent the sewage from entering storm drains and surface water bodies. The City will also make every effort to prevent sewage from discharging from storm drains into flood control channels and open ditches by blocking the storm drainage system and by removing the sewage from the storm drains. The use of the storm drain pipe system to contain the sewage by blocking the drain pipes, and recovering and cleaning up the spilled sewage, in order to prevent the sewage from being discharged to a surface water body is not a violation of the prohibitions listed above.

II. PROVISIONS
As stated in Order No. WQ 2022-0103-DWQ, the City must meet the provisions set forth in Section 6 PROVISIONS (complete descriptions in Appendix A):
o Enforcement Provisions
a. The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy. i. Enforceability of Clean Water Act and Water Code Violations o The City must comply with all conditions of Order No. WQ 2022- 0103-DWQ. Any noncompliance with Order No. WQ
2022-0103-DWQ constitutes a violation of the California Water Code and a potential violation of the Clean Water Car and is grounds for enforcement action.
ii. Monetary Penalties
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 7 of 50 ends

o The Water Code provides the State and Regional Water
Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of the General Order and violations of the Clean Water Act.
iii. Falsifying or Failure to Report
o The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as
required under the General Order, or falsifying any
information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. iv. Severability of General Order
o The provisions of the General Order are severable; if any provision of the Order, or the application of any provision of the Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of the Order shall not be affected thereby.
v. Indirect Discharges
o In the event that a spill enters into a drainage conveyance system, the City shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not
inadvertently impact beneficial uses of the receiving water body.
vi. Water Boards’ Considerations for Discretionary Enforcement o Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the
City’s efforts to contain, control, clean up, and mitigate spills. vii. Enforcement Discretion Based on Reporting Compliance o Consistent with the State Water Board Enforcement Policy, City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 8 of 50 ends

the State Water Board or a Regional Water Board may
consider the City’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383.
o Other Regional Water Board Orders
a. It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. o Sewer System Management Plan Availability
a. The City’s updated Sewer System Management Plan must be maintained for public inspection at the City’s offices and facilities and must be available to the public through CIWQS and/or on the City’s website, in accordance with Section

3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of Order No. WQ 2022-0101-DWQ.
o Entry and Inspection
a. The City shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
viii. Enter upon the City’s premises where a regulated facility or activity is located or conducted, or where records are kept;
ix. Have access to and reproduce any records required to be maintained; x. Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations; and
xi. Sample or monitor substances or parameters for assuring compliance with the General Order, or as otherwise authorized by the Water Code. xii. The City shall provide pre-inspection information to State and Regional Water Board staff through the completion of a PreInspection Questionnaire provided by Water Board staff.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 9 of 50 ends

ELEMENT 1. SSMP GOAL AND INTRODUCTION
The City’s Sewer System Management Plan Goals and Introduction addresses the mandatory SSMP element outlined in Attachment D, 1 Sewer System Management Plan Goal and Introduction of SWRCB Order No. WQ 2022-0103-DWQ. This Order is attached as Appendix A.

The Plan Introduction Section encompasses the following components:
o A general description of the local sewer system management program and discuss Plan implementation and updates.
o A schedule for the City to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.
o A description of the City-owned assets and service area o Reference to the City’s up-to-date map of its sanitary sewer system.

1.1 COMPLIANCE SUMMARY
The City of Vernon was founded in 1905 and is located approximately 5 miles southeast of downtown Los Angeles California. Over its long history, Vernon has been developed as an industrial community. Currently, the City’s owned and operated sanitary sewer collection system is made up of gravity sewers. The gravity system consists of approximately 44 miles of pipe. The City does not own or operate a sewer lift station and/or pressure pipes.

As part of the requirements in Order No. WQ 2022-0103-DWQ, the City has developed a Sewer System Management Plan (SSMP) to incorporate and address the sewer system’s management activities, planning and procedures. The goal of this SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the City’s sanitary sewer collection system, in order to reduce and prevent Sanitary Sewer Overflows (SSO’s), as well as contain and mitigate any SSO’s that do occur. Accordingly, the SSMP will satisfy the requirements of SWRCB Order No.

WQ 2022-0103- DWQ.

The following specific performance indicator goals have also been identified:
o Inspect 33% of all Interceptors annually;
o Clean 50% of all gravity mains annually;
o Conduct a CCTV video inspection of all Fats, Oils and Grease (FOG) hot spots and areas of interest every ten years;
o Conduct internal audits to the SSSMP every three years from the date the last audit was performed. The next internal audit must be completed in 2029. o Conduct updates to the SSMP every six years from the date the last update was City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 10 of 50 ends

performed. The next SSMP update must be completed in 2032. o Meet all applicable regulatory notification and reporting requirements per Order No.

WQ 2022-0103-DWQ.

1.2 COMPLIANCE DOCUMENTS
The following documents allow the City to comply with the plan goal and introduction requirements of the WDR, and are attached as appendices. o Sanitary Sewer System Index Map, City of Vernon, Appendix B.

1.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

1.3.1 Sanitary Sewer System Index Map (Appendix B)
The City maintains up-to-date AutoCAD and Geographic Information System (GIS) databases of their sanitary sewer system, comprised of gravity mains and manholes. The City does not own or operate a sewer lift station and/or pressure pipes. This database was utilized to create a map of the City’s wastewater facilities.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 11 of 50 ends

ELEMENT 2. ORGANIZATION
The City’s Organizational Structure addresses the mandatory SSMP element outlined in Attachment D, 2 Organization of SWRCB Order No. WQ 2022-0103-DWQ. This Order is attached as Appendix A.

The Organization Structure encompasses the following components:
o The name of the Legally Responsible Official as required in Section 5.1 (Designation of a Legally Responsible Official) of SWRCB Order No. WQ 2022-0103-DWQ.; o The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
o Organizational lines of authority; and
o Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable.

2.1 COMPLIANCE SUMMARY
The City maintains an Organization Structure which meets the requirements of Attachment D, 2 Organization of SWRCB Order No. WQ 2022-0103-DWQ:
o Daniel Wall, the Public Works Director/City Engineer, is the authorized representative for the City, as described in Section 5.1 of SWRCB Order No. WQ 2022-0103-DWQ; o The names and lines of authority for management, administrative and maintenance positions responsible for implementing specific measures in the SSMP are presented in the City of Vernon Organizational Chart and Public Works Organizational Chart, as shown in Appendix C and D, respectively. Phone numbers for these positions are listed in the City’s Telephone Directory, attached as Appendix E;
o As the primary first responders, the Department of Public Works will respond to a potential sanitary sewer overflow (SSO) site and will enlist the assistance of the Department of Health & Environmental Control. Should the SSO involve hazardous material, the Los Angeles County Fire Department will implement the necessary Hazardous Materials Incident Procedures for the handling of hazardous materials, attached as Appendix F. The Fire Department procedures includes the chain of communication, from notification to reporting of a hazardous material SSO, including the person responsible for reporting to all appropriate agencies. If there is no hazardous material involved, the Department of Public Works crew will proceed with containment, clean-up, and restoration, as per the Sanitary Sewer Overflow Response Plan, attached as Appendix H. This contains the chain of communication, from notification to reporting of non-hazardous material SSO’s, including the person responsible for reporting SSO’s to the State and Regional Water Boards.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 12 of 50 ends

2.2 COMPLIANCE DOCUMENTS
The following documents, attached as appendices, support the City’s Goals and Organization Structure, thereby allowing the City to comply with the Goals and Organization Structure of the Statewide Waste Discharge Requirement (WDR):
o City of Vernon Organizational Chart, Appendix C.
o Public Works Organizational Chart, Appendix D.
o Telephone Directory, Appendix E.
o Los Angeles County Fire Department Hazardous Materials Incident Procedures, Appendix F. o Sanitary Sewer Overflow Response Plan, Appendix G.

2.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

2.3.1 City of Vernon Organizational Chart (Appendix C)
The City of Vernon Organizational Chart includes the top director names and lines of authority for City Council and administrative positions responsible for each City department. This includes the Public Works Director, who is the City’s Legally Responsible Official and the City’s Health Department Director.

2.3.2 Public Works Organizational Chart (Appendix D)
The City’s Public Works Organizational Chart includes the names and lines of authority for those management, administrative and maintenance positions within the Department of Public Works.

2.3.3 Telephone Directory (Appendix E)
The City’s Telephone Directory includes numbers for those management, administrative and maintenance positions responsible for implementing specific measures in the SSMP.

A summary for key positions, including the personnel responsible for responding to and reporting non-hazardous material SSO’s, is presented below:
o Director of Public Works Department - Establishes policy, plans strategy, leads staff, allocates resources, delegates responsibility, authorizes outside contractors to perform services, and may serve as public information officer.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 13 of 50 ends

o Director of Public Works – Is the authorized representative for the City. Accordingly, oversees the SWRCB On-Line Reporting, as well the posting of any necessary public health warnings; manages field operations and maintenance activities, provides relevant information to agency management, prepares and implements contingency plans. o Environmental Health Specialist – Conducts inspections regarding spills and discharge which may include properties with privately owned Interceptors and direct the Public Works crew as needed and request contracted agencies for clean-up assistance if needed. o Management Analyst – Prepares wastewater collection system planning documents; documents new and rehabilitated assets; coordinates development and implementation of SSMP; and provides information updates to City Council. o Fire Department – As per their standard operating procedures, the Fire Department, when notified, will determine if the reported SSO includes a hazardous material, and if so, they will implement their SOP appropriately. The Fire Department also oversees reporting of the SSO to all appropriate agencies, excluding the SWRCB On-Line Reporting.
o Non-Emergency Police Dispatcher – Will be first notified of an SSO via the 24-Hour Non-Emergency Phone Line, contacts Public Works Department and the City’s Health and Environmental Control Crew.

2.3.4 LA County Fire Department Hazardous Materials Incident Procedures (Appendix F) As per their standard operating procedures, the Fire Department, when notified, will determine if the reported SSO includes a hazardous material, and if so, they will implement their SOP appropriately. The Fire Department SOP includes the chain of communication, from notification to reporting of a hazardous material SSO, including the person responsible for reporting to applicable agencies.

2.3.5 Sanitary Sewer Overflow Response Plan (Appendix G) The City’s chain of communication for reporting non-hazardous material SSO’s is described in detail in the City’s Sanitary Sewer Overflow Response Plan. The purpose of the Sanitary Sewer Overflow Response Plan is to minimize the impact of SSO’s to the public and the environment, in a manner which also provides for the safety of City personnel. All sanitary sewer overflows are responded to in a timely manner to expedite the necessary steps to relieve the overflow. This response plan is the guideline for the standard operating procedures in the event of a non-hazardous material SSO, City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 14 of 50 ends

including relieving the sewage blockage and spill containment. The response plan is reviewed periodically to ensure that all corrective measures are being taken.

All SSO’s are reported as soon as: (1) the City has knowledge of the discharge, (2) reporting is possible, and (3) reporting can be provided without substantially impeding cleanup or other emergency measures.

For any discharges of sewage that result in a discharge to a drainage channel or a surface water, the Department of Health & Environmental Control shall, as soon as possible but not later than two (2) hours after becoming aware of the discharge, notify the State Office of Emergency Services (for discharges of 1,000 gallons or more of sewage), Los Angeles County Health Department (for discharges that enter L.A. River), Long Beach City Health Department (for significant spills into L.A. River that may affect City of Long Beach) and the Los Angeles Regional Water Quality Control Board. Notification to the Los Angeles Regional Water Quality Control Board should be followed-up with a fax or email, and should also specify that the State Office of Emergency Services, Los Angeles County Health Department and Long Beach Health Department have already been notified.

In the event that any sewage is discharged into a Los Angeles County Storm Drain, the Department of Health & Environmental Control shall also notify Los Angeles County Public Works as soon as possible but not later than two (2) hours after becoming aware of the discharge.

For any sewage discharges that are identified by the Department of Public Works as originating from the Los Angeles County Sanitation District sewage line, the Department of Health & Environmental Control shall notify the Los Angeles County Sanitation District.

The “Reporting and Notification” section of the Sanitary Sewer Overflow Response Plan identifies the Public Works Director as the responsible or authorized representative for the City, and lists his name and contact information Accordingly, he will oversee the SWRCB On-Line Reporting.

Initial reporting of all Category 1 SSO’s originating from City-owned infrastructure (greater than 1,000 gallons, discharge to a drainage channel or surface water, and/or discharge to a storm drain which was not fully captured) must be reported to the Online SSO System as soon as possible but no later than 3 business days after the City is made aware of the SSO. A final certified report must be completed through the Online SSO System, within 15 calendar days of the conclusion of SSO response and remediation. Initial reporting of Category 2 SSO’s (all other SSO’s originating from City-owned infrastructure) must be reported to the Online SSO System within 30 days after the end of the calendar month in which the SSO occurred.

Specifically, the Sanitary Sewer Overflow Response Plan, contains the following sections:
o Purpose
o Spill Response
o Containment
o Emergency Traffic Control
o Blockage Removal
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 15 of 50 ends

o Bypass
o Reporting and Notification
o Posting
o Restoration
o Documentation
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 16 of 50 ends

ELEMENT 3. LEGAL AUTHORITY
The City’s Legal Authority addresses the mandatory SSMP element outlined in Attachment D, 3 Legal Authority of SWRCB Order No. WQ 2022-0103-DWQ. This Order is attached as Appendix A.

The City will demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to:
o Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages; o Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; o Require that sewer system components and connections be properly designed and constructed;
o Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the City;
o Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
o Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

3.1 COMPLIANCE SUMMARY
The City is regulated by several agencies of the United States Government and the State of California, pursuant to the provisions of Federal and State Law. Federal and State Laws (including, but not limited to: 1) Federal Water Pollution Control Act, commonly known as the Clean Water Act (33 U.S.C. Section 1251 et seq); 2) California Porter Cologne Water Quality Act (California Water Code section 13000 et seq.); 3) California Health & Safety Code sections 25100 to 25250; 4) Resource Conservation and Recovery Act of 1976 (42 U.S.C. Section 6901 et seq.); and 5) California Government Code, Sections 54739-54740) grant to the City the authority to regulate and/or prohibit, by the adoption of an ordinance, and by issuance of control mechanisms, the discharge of any waste, directly or indirectly, to the City sewerage facilities. Said authority includes the right to establish limits, conditions, and prohibitions; to establish flow rates or prohibit flows discharged to the City sewerage facilities; to require the development of compliance schedules for the installation of equipment systems and materials by all users; and to take all actions necessary to enforce its authority.

Due to the industrial nature of the City a large number of wastewater generators are classified as Industrial Waste Dischargers by the Sanitation Districts of Los Angeles County (Districts), and thus required to obtain an Industrial Waste Discharge Permit. The Districts are a group of special districts serving the wastewater and solid waste management needs of over five million people and City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 17 of 50 ends

3000 industrial users in Los Angeles County. The Districts were formed under the County Sanitation District Act, passed in 1923 by the California State Legislature. This Act provides for the formation of sewerage authorities based not on political boundaries but rather on the geographic boundaries of the waste disposal problems to be solved.

The Districts adopted a Wastewater Ordinance effective April 1, 1972, as amended on July 1, 1980, July 1, 1983, November 1, 1989, and July 1, 1998 to protect and finance the operation of the Districts' wastewater conveyance, treatment, and disposal facilities. Individual Districts also adopted Connection Fee Ordinances in 1981 (which were amended in 1984, 1990, 1992, and 1997).

Companies that discharge industrial wastewater to the sewerage system are governed by both the Wastewater Ordinance and the Connection Fee Ordinance for the District in which the discharge is located. These legal mechanisms establish the Districts' Industrial Wastewater Discharge Permit, Connection Fee, and Surcharge Programs. The Industrial Wastewater Discharge Permit Program allows for the regulation of industrial wastewater dischargers to protect the public health, environment, and the public sewerage system.

Through a series of Ordinances and Resolutions adopted by the City Council, the Sanitation Districts of the County of Los Angeles, Section 8.32.180 the Municipal Code of the City of Vernon and internally developed Plans and Requirements, the City possesses the necessary legal authority required by Attachment D, 3 Legal Authority of SWRCB Order No. WQ 2022-0103-DWQ:
o The City prevents illicit discharges into its sanitary sewer system through the Municipal Code of the City of Vernon (Section 13.24.070, 13.24.110 and 13.25.070), the Industrial Waste Discharge Permit Requirements of the Sanitation Districts of Los Angeles County (Section 3.2.B.3), and the Wastewater Ordinance of the Sanitation Districts of Los Angeles County (Sections 305 and 406);
o The City collaborates with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure through the Sanitary Sewer Overflow Response Plan (Section 2 and 3). o The City requires that sewers and connections be properly designed and constructed in compliance with the Standard Specifications for Public Works Construction (Greenbook), the City of Vernon Standard Drawings, the Municipal Code of the City of Vernon (Section 13.24.100), the Industrial Waste Discharge Permit Requirements of the Sanitation Districts of Los Angeles County (Section 3.2.A), and the Wastewater Ordinance of the Sanitation Districts of Los Angeles County (Sections 211 and 301);
o Per the Municipal Code of the City of Vernon Section 13.24.101 (Ordinance 1305, 2/4/25) all laterals in the City’s service area are private. The City ensures access for maintenance, inspection, or repairs for the private laterals of Industrial Waste Dischargers through the Industrial Waste Discharge Permit Requirements of the Sanitation Districts of Los Angeles County (Section 3.2.B), and the Wastewater Ordinance of the Sanitation Districts of Los Angeles County (Sections 206 and 303). Most all City-owned wastewater infrastructure is located in public Right-of-Way, for which the City has local authority and access. For the few City-owned facilities located on private property, access is secured through the City’s unwavering enforcement of the requirement for sewer easements around all public sewer appurtenances located in private properties. These easements are detailed by the designer on the sewer construction plans and are reviewed through the iterative plan check process. Plan checkers City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 18 of 50 ends

take special care to ensure that maintenance crews will have room for access and equipment usage for both routine maintenance and replacement or repair construction as necessary; o The City enforces any violation of its sewer ordinances through the Municipal Code of the City of Vernon (Section 13.24.220).

3.2 COMPLIANCE DOCUMENTS
The following documents allow the City to comply with the Legal Authority requirements of the WDR. These are readily available to the general public, and therefore have not been attached as an appendix:
o Municipal Code of the City of Vernon, https://library.qcode.us/lib/vernon_ca/pub/city_code o LACSD Industrial Waste Discharge Permit Requirements, LACSD, https://www.lacsd.org/home/showpublisheddocument/2206/637691084332626780 o LACSD Wastewater Ordinance, LACSD,
https://www.lacsd.org/home/showpublisheddocument/2092/637643639544700000 o Standard Specifications for Public Works Construction (Greenbook), Public Works Standards, Inc.

The following documents are attached as appendices and also support the City’s Legal Authority in compliance with the WDR requirements:
o Sanitary Sewer Overflow Response Plan, Appendix G.
o City of Vernon Standard Drawings, Appendix H.
o Los Angeles County Department of Public Works Standard Drawings, Appendix I.

3.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

3.3.1 Municipal Code of the City of Vernon
Link: https://library.qcode.us/lib/vernon_ca/pub/city_code Applicable sections of the Municipal Code of the City of Vernon:
o Section 13.24.040 – States that the City Engineer shall have charge and control of all sewers and storm drains in the City and shall construct, operate, maintain, and repair all such systems subject to the direction of the City Council. The City Engineer and/or the Health Officer shall enforce the provisions of this chapter. o Section 13.24.070 – States it is unlawful to place, throw, dump, drain, or deposit by any means, or cause to be placed, thrown, dumped, drained, or deposited by any means, any solid matter, liquids, chemicals, poisonous or explosive liquids or gases, oils, grease, or City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 19 of 50 ends

any other thing whatsoever which would, or could, cause damage, obstruct, or in any way interfere with or prevent the effective use or operation of the public sewer or create a condition that would require excessive maintenance of the public sewer. o Section 13.24.100 – States that each property or parcel on which domestic or industrial wastewater is generated shall have a connection to the City sewer for the disposal of said wastewater or shall have other means of disposing of the wastewater subject to the approval of the City Engineer. Any new connections to the public sanitary sewer system shall require the approval of the City Engineer and the sanitation districts. o Section 13.24.101 – States that the sewer main line is owned and maintained by the City.

The sewer lateral between the property and the sewer main line is owned, and shall be maintained, by the owner of the property served by the lateral. o Section 13.24.110 – States it is unlawful for any person to discharge industrial wastewater into the City sewer unless said person acquires, and maintains in effect, an industrial wastewater discharge permit from the sanitation districts. Said permit shall be obtained prior to discharging any industrial wastewater. The quality and quantity of the wastewater shall be subject to the approval of the City Engineer and the sanitation districts. Certain industrial wastewater discharges may be exempted from the requirement for an industrial wastewater discharge permit at the sole discretion of the sanitation districts. All applications for an industrial wastewater discharge permit shall be submitted to the City for approval prior to submittal to the sanitation districts, and the City and the sanitation districts may impose fees for the issuance of said permit. o Section 13.24.220 – States that every violation of this chapter is a misdemeanor and a public nuisance. Any person who is cited for any violation of this chapter shall abate said violation forthwith. The City Engineer: (a) may revoke the certificate of occupancy of any person; and (b) to the extent necessary, may terminate water and power service to any occupancy in order to abate a violation of this chapter. o Section 13.25.070 – States the following prohibitions shall apply to all Food Service Establishments (FSEs):
a. No additives may be introduced into an FSE's wastewater systems for the purpose of emulsifying FOG, unless a specific written authorization from the Director is obtained.
b. Waste cooking oil may not be disposed into drainage pipes. All waste cooking oils shall be collected and stored properly in receptacles such as barrels or drums for recycling or other acceptable methods of disposal. c. Biological additives for grease remediation or as a supplement to interceptor maintenance may not be used without prior written authorization from the Director.
d. Wastes from toilets, urinals, wash basins and other fixtures containing fecal materials may not be discharged to sewer lines with grease interceptor service.
e. Any waste including FOG and solid materials removed from the grease control device may not be discharged to the sewer system. Grease removed from grease interceptors shall be wastehauled periodically as part of the operation and maintenance requirements for grease interceptors.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 20 of 50 ends

o Section 13.25.080 – States no person shall discharge, or cause to be discharged any wastewater from a FSE directly or indirectly into the sewer system without first obtaining a FOG discharge permit pursuant to the ordinance codified in this chapter by January 1, 2030.
o Section 13.25.110 – Sewer system overflows (SSOs), public nuisance, abatement orders, cleanup costs, and cost recovery.
a. Notwithstanding any time limits provided elsewhere in this chapter, any person who discharges any waste which causes or contributes to a sewer blockage, SSO, obstruction, interference, damage or other impairment to the City's sewer facilities or to the operation of those facilities as a result shall be liable for all costs arising out of such discharge including abating, cleaning, repairing, and remediating the resulting condition, and the owner of the real property from which the discharge originated shall be jointly and severally liable for such costs. Sewer line blockages, SSOs or other interferences caused, in whole or in part, by FSE discharges are hereby declared public nuisances and are the responsibility of the FSE and the property owner of the premises from which the discharge originated and may be abated as provided in this chapter or in the manner provided in Chapter 8.20. The total amount shall be payable within 45 days of invoicing by the City.
b. When the Director determines that a discharge of FOG has caused or contributed to a blockage, SSO, or other interference with the City's sewer system, the Director may issue a written abatement and cleanup order to the FSE and/or property owner. The order may require the responsible party to:
• Perform cleanup, containment, and abatement of the discharge, spill, or overflow.
• Install, repair, or maintain grease control devices or other pretreatment equipment.
• Prepare and implement a corrective action or spill prevention plan; and
• Submit proof of cleanup and any required monitoring results to the City within the time specified in the order.
• The order shall specify the nature of the violation, the corrective actions required, and a compliance schedule.
c. Failure to comply with an abatement or cleanup order within the time specified constitutes a violation of this chapter and authorizes the City to undertake the required work and recover its costs under subsection C. • If, following notice to the responsible party and property owner, the City must contain, clean up, or otherwise abate an SSO or blockage caused by, or reasonably attributable to, an FSE discharge, whether on public or private property, or if the City must act immediately without notice to prevent an imminent threat to public health, safety, welfare, or property, the reasonable and necessary costs incurred by the City shall be recoverable from City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 21 of 50 ends

the FSE and/or property owner in accordance with this section. • Within 180 days after completion of City abatement, the City shall serve the FSE and property owner with a Notice of Cost Recovery itemizing the costs incurred and the factual basis for responsibility.

The FSE or property owner may file a written protest within 15 calendar days of service, stating the specific grounds of objection.

The protest shall be heard by the City Administrator under the administrative appeal procedures set forth in Section 13.25.340.

The City's itemized costs shall be presumed reasonable unless the appellant proves otherwise by a preponderance of the evidence. • Upon final administrative determination, the amount owed shall constitute a civil debt to the City, due and payable within 30 days of service of the final decision. If unpaid, the City may recover the amount by any lawful means, including civil action, lien against the property pursuant to Government Code Section 38773.1, or special assessment pursuant to Government Code Section
38773.5, following notice and opportunity for hearing under Section 13.25.350. The City may also recover interest at the legal rate, together with reasonable attorney's fees and costs of collection.
o Article IX – Presents the City’s enforcement plan for violations of their City Code.

3.3.2 LACSD Industrial Waste Discharge Permit Requirements Link: https://www.lacsd.org/home/showpublisheddocument/2206/637691084332626780 Any facility admitting industrial waste into the County sewer system is required to first apply for an Industrial Waste Discharge Permit. Facilities designated as Significant Industrial Users are required to go through a renewal/review permit process at a minimum of every five years. Sections of the Industrial Waste Discharge Permit Requirements of the Sanitation Districts of Los Angeles County, relevant to the City’s Legal Authority, are presented below:
o Section 3.2.A – This section details what sewer facility plans are required for industrial users in order to obtain an Industrial Waste Discharge Permit:
a. Sewerage Plan
b. Plot Plan
c. Plans of Pretreatment and Monitoring Facilities
o Section 3.2.B – This section details more plan specifications for the permit submittal City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 22 of 50 ends

process, which can include:
d. Spill Containment Systems
e. Flow Measurement Systems
f. Rainwater Management
g. Combustible Gas Monitoring Systems

3.3.3 LACSD Wastewater Ordinance
Link: https://www.lacsd.org/home/showpublisheddocument/2092/637643639544700000 Adopted in 1972 and most recently amended in 1998, all industrial users within the County owning a valid Industrial Waste Discharge Permit are required to comply with this Wastewater Ordinance.

Applicable sections of the Wastewater Ordinance of the Sanitation Districts of Los Angeles County include:
o Section 206 – Inspectors and Monitoring Personnel
o Section 211 – Approval of Plans and Issuance of Permits o Section 301 – Approval of Plans for Sewerage Construction o Section 303 – Inspection of Construction
o Section 305 – Prohibited Rainwater, Groundwater and other Water Discharges o Section 406 – Prohibited and Restricted Waste Discharges

3.3.4 Standard Specifications for Public Works Construction (Greenbook) The Greenbook, formally known as the Standard Specifications for Public Works Construction, is widely used by cities and counties from Santa Barbara County to San Diego County. Publication of the Greenbook is under the oversight of Public Works Standards, Inc, a nonprofit mutual benefit corporation. It contains all the latest standards and recommendations that have been researched and approved by a 25-member committee, with representatives from the American Public Works Association, the Associated General Contractors of California, the Engineering Contractors Association, and the Southern California Contractors Association.

3.3.5 Sanitary Sewer Overflow Response Plan (Appendix G) The Sanitary Sewer Overflow Response Plan serves as the guideline for the standard operating procedures in the event of a non-hazardous material SSO, including relieving the sewage blockage and spill containment.
o Section 2 of the City’s Sanitary Sewer Overflow Response Plan contains a program to ensure an appropriate response to all overflows;
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 23 of 50 ends

o Section 3 of the City’s Sanitary Sewer Overflow Response Plan contains a program to ensure containment of sanitary sewer overflows.

3.3.6 City of Vernon Standard Drawings (Appendix H)
Used as a standard for City facilities admitting waste into the sewer system, these drawings provide a guideline for installation of new sewer system facilities. All final plans must first be approved by the City Engineer. These drawings reference the Standard Specifications for Public Works Construction (Greenbook), and include the City’s standard drawings for:
o Standard Sidewalk, Curb, and Gutter
o Curb Drains
o Parkway Drain No.1
o Standard Driveway
o Standard Offset Requirements
o 24” Manhole Frame and Cover
o Typical Trench Paving Section for Sewer Lateral

3.3.7 Los Angeles County Department of Public Works Standard Drawings (Appendix I) Used as a standard for Los Angeles County facilities admitting industrial waste into the sewer system, these drawings provide a guideline for installation of new sewer system facilities related to the Industrial Wastewater Discharge Permit Requirements of the Sanitation Districts of Los Angeles County. These drawings include the county’s sewer system standard drawings for:
o Grease Interceptor
o Rain Water Diversion System
o Sampling Box
o Sand and Grease Interceptor
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 24 of 50 ends

ELEMENT 4. OPERATION AND MAINTENANCE PROGRAM
The City’s Operating and Maintenance Program addresses the mandatory SSMP element outlined in Attachment D, 4 Operation and Maintenance Program of SWRCB Order No. WQ 2022-0103- DWQ. This Order is attached as Appendix A.

The Operation and Maintenance Program encompasses the following components:
o An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) show gravity line segments and manholes, and applicable stormwater conveyance facilities within the sewer system service area boundaries.
o A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors. The scheduling system includes include:
a. Inspection and maintenance activities;
b. Higher-frequency inspections and maintenance of known problem areas, including areas with fats, oils and grease discharge;
c. Regular visual inspections of manholes and sewer pipes. d. The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to fats, oil and grease discharge potentially resulting in system backup and/or failure. o In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training covers:
a. The requirements of this General Order;
b. The Enrollee’s Spill Emergency Response Plan procedures and practice drills; c. Skilled estimation of spill volume for field operators; and d. Electronic CIWQS reporting procedures for staff submitting data. o An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

4.1 COMPLIANCE SUMMARY
The City maintains an Operation and Maintenance Program which meets the requirements of Attachment D, 4 Operation and Maintenance Program of SWRCB Order No. WQ 2022-0103- DWQ:
o The City maintains up-to-date AutoCAD and Geographic Information System (GIS) City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 25 of 50 ends

databases of their sanitary sewer system, comprised of gravity mains and manholes. The City does not own or operate a sewer lift station and/or pressure pipes. This database was utilized to create a map of the City’s wastewater facilities as shown in the Sanitary Sewer System Index Map, Appendix B.
o The City routinely cleans all City-owned gravity mains, at a minimum, of every 2 years. The City inspects known problem area gravity mains weekly, and cleans these areas as-needed.

The City maintains a database of all cleaning activity which details the time, date and location of each pipe cleaned, as well as remarks noted by the sewer crew. The City maintains records of all preventative maintenance and work orders. The City also maintains records which document the condition and maintenance history of each City owned manhole.
o The City of Vernon Department of Public Works also has a Sewer and Storm Drain Programmed Maintenance System, Appendix J, in place to ensure the infrastructure is performing efficiently without interruptions due to the lack of maintenance. Plan includes Inspection, Cleaning, Insect Control, and Record Keeping instructions and procedures for the sewer system.
o The City provides on-going in-house technical, job skills and safety training for its staff.

The City has been and continues to conduct training of Waste Discharge Requirements (WDR) awareness. The City has developed an SSO Response Training per Sanitary Sewer Overflow Response Plan, Appendix G. The City also conducts other internal training programs on line cleaning, vactor truck operation, sewer grit removal and dumping, and other related tasks. The City has not encountered a situation or non-compliance event that would cause it to believe that O&M Staff is not appropriately trained; and o The City maintains a Pipe Yard with all necessary, back-up parts as inventory to support their gravity mains and manholes. The City does not own or operate a lift station and/or pressurized pipe.

4.2 COMPLIANCE DOCUMENTS
The following documents, attached as appendices, support the City’s Operation and Maintenance Program, thereby allowing the City to comply with the Operation and Maintenance Program requirements of the WDR:
o Sanitary Sewer System Index Map, City of Vernon, Appendix B. o Sanitary Sewer Overflow Response Plan, Appendix G.
o Sewer and Strom Drain Programmed Maintenance System, Appendix J.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 26 of 50 ends

4.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

4.3.1 Sanitary Sewer System Index Map (Appendix B)
The City maintains up-to-date AutoCAD and Geographic Information System (GIS) databases of their sanitary sewer system, comprised of gravity mains and manholes. The City does not own or operate a sewer lift station and/or pressure pipes. This database was utilized to create a map of the City’s wastewater facilities.

4.3.2 Sanitary Sewer Overflow Response Plan (Appendix G) The Sanitary Sewer Overflow Response Plan serves as the guideline for the standard operating procedures in the event of a non-hazardous material SSO, including relieving the sewage blockage and spill containment.
o Section 11 of the City’s Sanitary Sewer Overflow Response Plan states relevant personnel shall review this procedure during internal training sessions and/or a field practicum no less than semi-annually.

4.3.3 Sewer and Storm Drain Programmed Maintenance System (Appendix J) The City has a Sewer and Storm Drain Programmed Maintenance system plan that includes additional instructions and procedures for inspection, cleaning, insect control, and record keeping for the sewer system.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 27 of 50 ends

ELEMENT 5. DESIGN AND PERFORMANCE PROVISIONS
The City’s Design and Performance Provisions addresses the mandatory SSMP element outlined in Attachment D, 5 Design and Performance Provisions of SWRCB Order No. WQ 2022-0103- DWQ. This Order is attached as Appendix A.

The Design and Performance Provisions encompass the following components:
o Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.; and
o Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

5.1 COMPLIANCE SUMMARY
Per Section 13.24.040 of the Municipal Code of City of Vernon, the City Engineer has charge and control of all sewers in the City. Accordingly, per the Department of Public Works, and Engineering, all require that all new sanitary sewer systems, as well as the rehabilitation and repair of existing sewer facilities, be designed and constructed in accordance with the Standard Specifications for Public Works Construction (Greenbook), published by Public Works Standards, Inc.

Specifically, the City of Vernon Standard Drawings reference the Greenbook, as does the standard contract language the City utilizes in all such construction projects.

Procedures and standards for inspecting and testing the installation of new sewers and other appurtenances, and for rehabilitation and repair projects, are maintained by the Department of Public Works. Specifically, all City-owned sewer facilities are left uncovered until the Public Works Director/City Engineer has completed inspection and testing in accordance with the Greenbook.

The City maintains Design and Performance Provisions which meet the requirements of Attachment D, 5 Design and Performance Provisions of SWRCB Order No. WQ 2022-0103-DWQ:
o The City utilizes the Standard Specifications for Public Works Construction (Greenbook) for design and construction standards and specifications for the installation of new sanitary sewer systems, pumps and other appurtenances, and for the rehabilitation and repair of existing sanitary sewer infrastructure. The City of Vernon Standard Drawings reference the Greenbook, as does the standard contract language the City utilizes in all relevant construction projects; and
o The Public Works Department utilizes procedures and standards for inspecting and testing the installation of new sewers, pumps and other appurtenances and for rehabilitation and repair projects, which are in accordance with the Greenbook. All City-owned sewer facilities are left uncovered until the City Inspector completes the inspection.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 28 of 50 ends

5.2 COMPLIANCE DOCUMENTS
The following document is attached as an appendix in order support the City’s Design and Performance Provisions, thereby allowing the City to comply with the Design and Performance Provisions requirements of the WDR:
o City of Vernon Standard Drawings, Appendix H.
o Los Angeles County Department of Public Works Standard Drawings, Appendix I.

The following documents are readily available to the general public, and have therefore not been attached as an appendix:
o Municipal Code of the City of Vernon, https://library.qcode.us/lib/vernon_ca/pub/city_code o Standard Specifications for Public Works Construction (Greenbook), Public Works Standards, Inc.

5.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

5.3.1 City of Vernon Standard Drawings (Appendix H)
These drawings reference the Greenbook, and include the City’s standard drawings for:
o Standard Sidewalk, Curb, and Gutter
o Curb Drains
o Parkway Drain No.1
o Standard Driveway
o Standard Offset Requirements
o 24” Manhole Frame and Cover
o Typical Trench Paving Section for Sewer Lateral

5.3.2 Los Angeles County Department of Public Works Standard Drawings (Appendix I) These drawings include the City’s sewer system standard drawings for:

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 29 of 50 ends

o Grease Interceptor
o Rain Water Diversion System
o Sampling Box
o Sand and Grease Interceptor

5.3.3 Municipal Code of the City of Vernon
Link: https://library.qcode.us/lib/vernon_ca/pub/city_code Applicable sections of the Municipal Code of the City of Vernon:
o Section 13.24.040 – States that the City Engineer shall have charge and control of all sewers and storm drains in the City and shall construct, operate, maintain, and repair all such systems subject to the direction of the City Council. The City Engineer and/or the Health Officer shall enforce the provisions of this chapter.

5.3.4 Standard Specifications for Public Works Construction (Greenbook) The Greenbook, formally known as the Standard Specifications for Public Works Construction, is widely used by cities and counties from Santa Barbara County to San Diego County. Publication of the Greenbook is under the oversight of Public Works Standards, Inc, a nonprofit mutual benefit corporation. It contains all the latest standards and recommendations that have been researched and approved by a 25-member committee, with representatives from the American Public Works Association, the Associated General Contractors of California, the Engineering Contractors Association, and the Southern California Contractors Association.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 30 of 50 ends

ELEMENT 6. SPILL EMERGENCY RESPONSE PLAN
The City’s Spill Emergency Response Plan addresses the mandatory SSMP element outlined in Attachment D, 6 Spill Emergency Response Plan of SWRCB Order No. WQ 2022-0103-DWQ.

This Order is attached as Appendix A.

The Overflow Emergency Response Plan encompasses the following components:
o Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
o Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; o Comply with the notification, monitoring and reporting requirements of the General Order, State law and regulations, and applicable Regional Water Board Orders; o Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
o Address emergency system operations, traffic control and other necessary response activities;
o Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
o Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
o Remove sewage from the drainage conveyance system;
o Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; o Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
o Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; o Conduct post-spill assessments of spill response activities; o Document and report spill events as required in the General Order; and o Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

6.1 COMPLIANCE SUMMARY
The City has outlined specific measures to protect public health and the environment in their City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 31 of 50 ends

Sanitary Sewer Overflow Response Plan (Appendix G). These procedures contain a plan for responding and reporting to SSOs which includes, but is not limited to, the following:
o Descriptions, responsibilities and authorities for each management, administrative and maintenance position responsible for responding to and reporting an SSO. o Procedures for receiving SSO notification and immediately notifying first responders of the SSO.
o Procedures to rapidly mobilize; contain any SSO; and diagnose, report on, and relieve its cause.
o Procedures to provide emergency operations, such as traffic control, in the event of an SSO.
o Procedures for reporting all SSOs to the On-Line SSO Reporting System. o Procedures to post the proper signs to warn the public of potential contamination hazards.
o Procedures to restore the environment to the condition that existed before the SSO occurred.

The City conducts internal training sessions to ensure familiarity with these procedures and prepare staff for an SSO event, from initial notification to SSO report documentation, including any necessary emergency activities, such as traffic control.

The City has also established an annual budget for Overflow Emergency Repairs and hired an oncall contractor to handle all sewer and overflow emergency repair services, as necessary.

Through these documents and programs, the City has developed and implemented an Overflow Emergency Response Plan that identifies measures to protect public health and the environment, thereby satisfying Attachment D, 6 Spill Emergency Response Plan of SWRCB Order No. 2022- 0103-DWQ:
o Section 2 and 7 of the City’s Sanitary Sewer Overflow Response Plan outline the proper SSO response and notification procedures, thereby ensuring that primary responders and regulatory agencies are informed of all SSOs in a timely manner; o Section 2 of the City’s Sanitary Sewer Overflow Response Plan contains a program to ensure an appropriate response to all overflows;
o Section 7 of the City’s Sanitary Sewer Overflow Response Plan outlines the procedures which ensure prompt notification to appropriate regulatory agencies and other potentially affected entities of all SSOs that potentially affect public health or reach the waters of the State in accordance with the Monitoring and Reporting Program (MRP). The Director of Public Works is the authorized representative for the City. Accordingly, he will oversee the SWRCB On-Line Reporting. The Department of Health & Environmental Control will report the SSO to all other appropriate agencies with the appropriate contact information in Section 7. This ensures that all regulatory agencies are informed of all SSOs in a timely manner.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 32 of 50 ends

o As per Section 11 of the City’s Sanitary Sewer Overflow Response Plan, the City conducts internal training sessions to ensure familiarity with these procedures and prepare staff and contractor personnel for an SSO event, from initial notification to SSO report documentation, including any necessary emergency activities, such as traffic control; o Procedures to address emergency operations, such as traffic control and other necessary response activities, are addressed in Sections 4 and 8 of the City’s Sanitary Sewer Overflow Response Plan; and
o Sections 2, 3 and 9 of the City’s Sanitary Sewer Overflow Response Plan ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs.
o In the event of a sewage discharge that results in a discharge to a drainage channel or a surface water, the Department of Health & Environmental Control shall, as soon as possible, but not later than two (2) hours after becoming aware of the discharge, notify the State Office of Emergency Services, Los Angeles County Health Department (for discharges that enter L.A. River), Long Beach City Health Department (for significant spills into L.A. River that may affect City of Long Beach) and the Los Angeles Regional Water Quality Control Board; and
o Notification to the Los Angeles Regional Water Quality Control Board would be followed-up within 24 hours by phone, fax or email, and would also specify that the State Office of Emergency Services, Los Angeles County Health Department and Long Beach Health Department have already been notified

6.2 COMPLIANCE DOCUMENTS
The following document allow the City to comply with the overflow and emergency response plan requirements of the WDR, and is attached as an appendix. o Sanitary Sewer Overflow Response Plan, Appendix G.

6.3 DOCUMENT DESCRIPTION
A description for each compliance document listed above is described below:

6.3.1 Sanitary Sewer Overflow Response Plan (Appendix G) The City of Vernon maintains a plan for responding and reporting to SSOs in their Sanitary Sewer Overflow Response Plan. The purpose of these procedures is to minimize the impact of SSO’s to the public and the environment. This response plan is a guideline for the standard operating procedures in the event of a SSO and is reviewed periodically to ensure that all corrective measures are being taken. The plan includes the following contents:
o Spill Response
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 33 of 50 ends

o Containment
o Emergency Traffic Control
o Blockage Removal
o Bypass
o Reporting and Notification
o Posting
o Restoration
o Documentation
o Training
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 34 of 50 ends

ELELMENT 7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The City’s Fats, Oils and Grease Control Program addresses the mandatory SSMP element outlined in Attachment D, 7 Sewer Pipe Blockage Control Program of SWRCB Order No. 2022- 0103-DWQ. This Order is attached as Appendix A.

The FOG Control Program helps reduce the amount of Fats, Oils and Grease discharged to the sanitary sewer system and encompasses the following components:
o An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
o A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area;
o The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
o Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; o Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; o An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and o Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

7.1 COMPLIANCE SUMMARY
To reduce the amount of Fats, Oils and Grease (FOG) discharged to City’s sanitary sewer system, the City has developed a FOG control program. All major industrial users within the City’s service area are identified as part of an initial occupancy inspection by the Department of Public Works.

Accordingly, these customers must complete an Industrial Waste Discharge Permit application with the Sanitation Districts of Los Angeles County (LACSD). This application includes a wastewater sewerage plan showing sewers and associated facilities for the handling of industrial wastewater from the point of origin to the public sewer connection, and identification of all wastewater generation processes. When applicable, additional plans containing spill containment systems, grease interceptors and/or flow measurement systems are included. The City is within LACSD District No.’s 1, 2 and 23. The City requires the installation of a grease interceptor prior to providing service for all new restaurants.

Sand and Grease interceptor inspections for major industrial users are conducted by LACSD staff.

The City’s Health and Environmental Control Department is authorized as a Certified Unified City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 35 of 50 ends

Program Agency (CUPA) by the California Environmental Protection Agency. As such, the Health and Environmental Control Department is authorized to conduct hazardous material inspections, which may include properties with privately owned interceptors. The City Health and Environmental Control Department logs their inspections in a Tyler database, and has sufficient staff to inspect restaurants once per year.

The City currently uses the Los Angeles County Department of Public Works’ and LACSD standard drawings for both Sand and Grease Interceptors. The City requires private owners to maintain their interceptors, and maintains a list of several independent vendors that will collect and dispose of accumulated FOG.

In an effort to identify and maintain information of sanitary sewer sections subject to FOG blockages, the City has developed a list of FOG hot spots, which includes the current frequency of cleaning for each segment.

In summary, the City maintains a FOG Control which meets the requirements of Attachment D, 7 Sewer Pipe Blockage Control Program of SWRCB Order No. 2022-0103-DWQ:
o The City maintains a plan and schedule for the disposal of FOG generated within their sanitary sewer system service area. All major industrial users within the City’s service area are identified as part of an initial occupancy inspection by the Department of Health and Environmental Control. These customers must complete an Industrial Waste Discharge Permit application with LACSD. Accordingly, they are required to maintain and operate appropriate pretreatment facilities, per Section 412 of the LACSD Wastewater Ordinance.

The City requires the installation of a grease interceptor prior to providing service to new restaurants. Interceptors must be maintained by their owners, and pumped out when full.

Restaurants are required to have bi-annual interceptor inspections while major industrial users have inspections per the LACSD Wastewater Ordinance, specifically Section 206. The City has provided a list of independent vendors which provide collection and disposal services within their service area in their Independent Collection/Disposal Service Vendor List; Appendix M.
o The City possesses the legal authority to prohibit discharges to the system and identify measures to prevent SSO’s and blockages caused by FOG through the Municipal Code of the City of Vernon, specifically Sections 13.24.040, 13.24.070 and 13.24.110; o All major industrial users within the City’s service area are identified as part of an initial occupancy inspection by the Department of Public Works. These customers must complete an Industrial Waste Discharge Permit application with LACSD. Accordingly, they are required to install, design, maintain, monitor and report their grease removal devices in compliance with LACSD Wastewater Ordinance. The City requires all new restaurants to install Grease Interceptors;
o All major industrial users within the City’s service area are required to complete an Industrial Waste Discharge Permit application with LACSD. Accordingly, LACSD has authority to inspect all major industrial users and restaurants as per the LACSD Wastewater Ordinance, specifically Section 206. Furthermore, the City’s Health and Environmental Control Department is authorized as a Certified Unified Program Agency City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 36 of 50 ends

(CUPA) by the California Environmental Protection Agency. As such, the Health and Environmental Control Department is authorized to conduct hazardous material inspections, which may include properties with privately owned interceptors. The City Health and Environmental Control Department logs their inspections in a Tyler database and has sufficient staff to inspect restaurants once per year; o The City has identified sections of their sanitary sewer system subject to high levels of FOG in their Sanitary Sewer System Hotspot Maps and List (Appendix L). Accordingly, the City has put together a map of FOG hot spots with an associated map sectioned out, conveying both location and maintenance schedule for each problem area; o The City has developed and implemented source control measures for all sources of FOG discharged to the sanitary sewer system by prohibiting the discharge of FOG into their sewer system per Municipal Code of the City of Vernon, Section 13.24.070, and requiring all major industrial users and restaurants to complete an Industrial Waste Discharge Permit application with LACSD, as per Municipal Code of the City of Vernon, Section 13.24.110; o The City has developed a Public Outreach Program for public education promoting proper disposal of FOG and best management practices (BMP). The City has developed formal literature to be disseminated to all customers every three years. o The City of has adopted Chapter 13.25 of the Municipal Code of the City of Vernon, which establishes regulations governing the discharge of fats, oils, and grease (FOG) into the City's sewer system. These regulations are intended to help prevent sewer blockages, sanitary sewer overflows, and damage to the City's wastewater infrastructure.

7.2 COMPLIANCE DOCUMENTS
The following documents are attached as appendices in order support the City’s FOG Control Program, thereby allowing the City to comply with the Sewer Pipe Blockage Control Program requirements of the WDR:
o City of Vernon Standard Drawings, Appendix H.
o Los Angeles County Department of Public Works Standard Drawings, Appendix I. o Public Outreach Program for FOG Control, City of Vernon, Appendix K. o Sanitary Sewer System Hotspot Maps and List, City of Vernon, Appendix L. o Independent Collection/Disposal Service Vendor List, City of Vernon, Appendix M.

The following documents are readily available to the general public, and have therefore not been attached as appendices:
o Municipal Code of the City of Vernon, https://library.qcode.us/lib/vernon_ca/pub/city_code o LACSD Wastewater Ordinance, LACSD,
https://www.lacsd.org/home/showpublisheddocument/2092/637643639544700000 o Standard Specifications for Public Works Construction (Greenbook), Public Works Standards, Inc.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 37 of 50 ends

7.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

7.3.1 City of Vernon Standard Drawings (Appendix H)
Used as a standard for City facilities admitting waste into the sewer system, these drawings provide a guideline for installation of new sewer system facilities. All final plans must first be approved by the city engineer. These drawings reference the Standard Specifications for Public Works Construction (Greenbook), and include the City’s standard drawings for:
o Standard Sidewalk, Curb, and Gutter
o Curb Drains
o Parkway Drain No.1
o Standard Driveway
o Standard Offset Requirements
o 24” Manhole Frame and Cover
o Typical Trench Paving Section for Sewer Lateral

7.3.2 Los Angeles County Department of Public Works Standard Drawings (Appendix I) Used as a standard for Los Angeles County facilities admitting industrial waste into the sewer system, these drawings provide a guideline for installation of new sewer system facilities related to the Industrial Waste Discharge Permit Requirements of the Sanitation Districts of Los Angeles County. These drawings include the county’s sewer system standard drawings for:
o Grease Interceptor
o Rain Water Diversion System
o Sampling Box
o Sand and Grease Interceptor

7.3.3 Public Outreach for FOG Control (Appendix K)
The City has developed this document to be supplied to all customers every three years. This mailer further defines FOG and its importance of being properly managed. It includes general prevention tips such as technology and cleaning methods. In order to accommodate each of the following FOG producers, cleaning methods and technology target the general public, as well as restaurants and the automotive sector.

The City of has adopted Chapter 13.25 of the Municipal Code of the City of Vernon, which establishes rules governing the discharge of fats, oils, and grease (FOG) into the City's sewer system. FOG discharged by food service establishments is one of the leading causes of sewer line blockages and sanitary sewer overflows (SSOs). The ordinance is designed to protect the sewer infrastructure, prevent spills, and maintain compliance with state and federal water quality laws. Outreach City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 38 of 50 ends

material regarding the program, key deadlines and penalties has been developed and will be distributed to the community.

7.3.4 Sanitary Sewer System Hotspot Maps and List (Appendix L) A map showing the City maintenance and inspection sections, a map showing the hotspot sections, and an associated list showing current hot spots are included.

7.3.5 Independent Collection/Disposal Service Vendor List (Appendix M) A partial list of independent vendors which can provide collection and disposal services within their service area. There are several independent vendors which can provide grease interceptor cleaning services. This list represents a random selection of a portion of these vendors, and does not imply City endorsement of any specific vendor.

7.3.6 Municipal Code of the City of Vernon
Link: https://library.qcode.us/lib/vernon_ca/pub/city_code Applicable sections of the Municipal Code of the City of Vernon:
o Section 13.24.040 – States that the City Engineer shall have charge and control of all sewers and storm drains in the City and shall construct, operate, maintain, and repair all such systems subject to the direction of the City Council. The City Engineer and/or the Health Officer shall enforce the provisions of this chapter. o Section 13.24.070 – States it is unlawful to place, throw, dump, drain, or deposit by any means, or cause to be placed, thrown, dumped, drained, or deposited by any means, any solid matter, liquids, chemicals, poisonous or explosive liquids or gases, oils, grease, or any other thing whatsoever which would, or could, cause damage, obstruct, or in any way interfere with or prevent the effective use or operation of the public sewer or create a condition that would require excessive maintenance of the public sewer. o Section 13.24.110 – States it is unlawful for any person to discharge industrial wastewater into the City sewer unless said person acquires, and maintains in effect, an industrial wastewater discharge permit from the sanitation districts. Said permit shall be obtained prior to discharging any industrial wastewater. The quality and quantity of the wastewater shall be subject to the approval of the City Engineer and the sanitation districts. Certain industrial wastewater discharges may be exempted from the requirement for an industrial wastewater discharge permit at the sole discretion of the sanitation districts. All applications for an industrial wastewater discharge permit shall be submitted to the City for approval prior to submittal to the sanitation districts, and the City and the sanitation districts may impose fees for the issuance of said permit.

7.3.7 LACSD Wastewater Ordinance
Link: https://www.lacsd.org/home/showpublisheddocument/2092/637643639544700000 Adopted in 1972 and most recently amended in 1998, all industrial users within the County owning a valid Industrial Waste Discharge Permit are required to comply with this Wastewater Ordinance.

Applicable sections of the Wastewater Ordinance of the Sanitation Districts of Los Angeles County include:

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 39 of 50 ends

o Section 206 – Inspectors and Monitoring Personnel
o Section 211 – Approval of Plans and Issuance of Permits o Section 301 – Approval of Plans for Sewerage Construction o Section 303 – Inspection of Construction
o Section 305 – Prohibited Rainwater, Groundwater and other Water Discharges o Section 406 – Prohibited and Restricted Waste Discharges

7.3.8 Standard Specifications for Public Works Construction (Greenbook) The Greenbook, formally known as the Standard Specifications for Public Works Construction, is widely used by cities and counties from Santa Barbara County to San Diego County. Publication of the Greenbook is under the oversight of Public Works Standards, Inc, a nonprofit mutual benefit corporation. It contains all the latest standards and recommendations that have been researched and approved by a 25-member committee, with representatives from the American Public Works Association, the Associated General Contractors of California, the Engineering Contractors Association, and the Southern California Contractors Association. The City of Vernon Standard Drawings reference the Greenbook, and are used as a standard for City facilities admitting waste into the sewer system and serve as a guideline for installation of new sewer system facilities.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 40 of 50 ends

ELEMENT 8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL

IMPROVEMENTS
The City’s System Evaluation, Capacity Assurance and Capital Improvements Plan addresses the mandatory SSMP element outlined in Attachment D, 8 System Evaluation, Capacity Assurance and Capital Improvements of SWRCB Order No. 2022-0103-DWQ. This Order is attached as Appendix A.

The System Evaluation, Capacity Assurance, and Capital Improvements encompasses the following components:
o System Evaluation and Condition Assessment
a. Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
b. Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
c. Prioritize the condition assessment of system areas that:
• Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; • Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; • Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List; d. Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
e. Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
f. Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
g. Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
o Capacity Assessment and Design Criteria
a. Identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 41 of 50 ends

• Dry-weather peak flow conditions that cause or contributes to spill events;
• The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.
b. The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions; • Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change;
• Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities. o Prioritization of Corrective Action
a. The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.
o Capital Improvement Plan
a. Project schedules including completion dates for all portions of the capital improvement program;
b. Internal and external project funding sources for each project; and c. Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 42 of 50 ends

8.1 COMPLIANCE SUMMARY
The City is in the process of developing a System Evaluation, Capacity Assurance, and Capital Improvements Plan which meets the requirements of Attachment D, 8 System Evaluation, Capacity Assurance, and Capital Improvements of SWRCB Order No. 2022-0103-DWQ:
o The City’s 2008 Sewer System Hydraulic Analysis includes wastewater flow projections and a hydraulic analysis of all City-owned gravity mains. The analysis, performed with an H20Map Sewer hydraulic model, includes estimates of peak dry and wet weather flows. The City completed the 2009 Wet Weather Flow Study, which was utilized to calibrate the hydraulic model. The 2008 Sewer System Hydraulic Analysis outlines a Wastewater Capital Improvement Program to mitigate projected deficiencies in the Existing, 5-Year, 10-Year and 20-Year (Planning Horizon) time increment. Sanitary Sewer Overflows were not allowed to exit the system during the hydraulic analysis. o As an alternative to upsizing the capacity of a sewer line, the City may opt to require a reduction in flow of an industrial waste discharger to such an extent that the existing sewer line will have sufficient capacity to meet the City’s design criteria. Per the municipal code, the City has the authority to require a reduction in flow from a business which are violating their LACSD permit;
o The City’s 2008 Sewer System Hydraulic Analysis summarizes the appropriate design and replacement criteria necessary to ensure sufficient capacity, as well as preserve the estimated life-cycle of wastewater infrastructure;
o The City established a short- and long-term Capital Improvement Program (CIP) to address projected hydraulic deficiencies in the 2008 Sewer System Hydraulic Analysis. This includes projected cost estimates, alternatives analysis and project prioritization by 5-Year time increment. The City’s 2008 Sewer System Hydraulic Analysis presents a phased and prioritized Wastewater Capital Improvement Plan (CIP), with funding anticipated through the City’s General Fund;
o Currently, the City is in the process of preparing and implementing an updated Capital Improvement Program (CIP). The City has already established an annual budget for Overflow Emergency Repairs, including hiring an On-Call Contractor to handle all Sewer and Over Flow Emergency Repair services. As part of developing the CIP, the City is planning to do the next round of citywide sewer CCTV inspections within the next 5 years, as part of their ten-year cycle for CCTV inspections. The inspections will help the City develop sewer improvements such as slip lining and/or replacement of damaged sections needed to ensure the sewer design and capacity is efficient and results in fewer overflows and potential hazard to the public.

8.2 COMPLIANCE DOCUMENTS
The following documents support the City’s System Evaluation, Capacity Assurance and Capital Improvement Plan, thereby allowing the City to comply with the System Evaluation, Capacity Assurance and Capital Improvements Plan requirements of the WDR:

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 43 of 50 ends

o 2008 Sewer System Hydraulic Analysis, Infrastructure Engineering Corporation, March 2010, Appendix N.

8.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

8.3.1 2008 Sewer System Hydraulic Analysis (Appendix N) Infrastructure Engineering Corporation completed this March 2010 review and updated analysis of the wastewater flow projections and hydraulic analysis. The analysis, performed with an H20Map Sewer hydraulic model, includes estimates of peak dry and wet weather flows, and outlines a Wastewater Capital Improvement Program to mitigate projected deficiencies in the Existing, 5- Year, 10-Year and 20-Year (Planning Horizon) time increment. As an alternative to upsizing the capacity of a sewer line the City may opt to require a reduction in flow of an industrial waste discharger to such an extent that the existing sewer line will have sufficient capacity to meet the City’s design criteria. Specific sections in the 2008 Sewer System Hydraulic Analysis include:
o Wastewater Flows and Projections
o Hydraulic Model Development
o Hydraulic Model Calibration
o Gravity Main Design Criteria, Replacement Criteria and Unit Costs o Hydraulic Modeling Results
o Capital Improvement Program
City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 44 of 50 ends

ELEMENT 9. MONITORING, MEASUREMENT AND PROGRAM

MODIFICATIONS
The City’s Monitoring, Measurement and Program Modifications addresses the mandatory SSMP element outlined in Attachment D, 9 Monitoring, Measurement and Program Modifications of SWRCB Order No. 2022-0103-DWQ. This Order is attached as Appendix A.

The Monitoring, Measurement, and Program Modifications encompasses the following components:
o Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
o Monitoring the implementation and measuring the effectiveness of each Plan Element; o Assessing the success of the preventive operation and maintenance activities; o Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
o Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

9.1 COMPLIANCE SUMMARY
The City tracks the location and cause of all SSOs, blockages, and gravity main hot-spots. The City maintains a database of all cleaning activity which details the time, date and location of each pipe cleaned, as well as remarks noted by the sewer crew. The City maintains records all preventative maintenance and work orders. The City also maintains a database which documents the condition and maintenance history of each City owned manhole.

The City intends to conduct the next CCTV video inspection within the next five years. City engineers will review the videos of all problem areas noted in the inspection, as well as video of all previously identified problem areas. The City will then identify gravity mains that are at risk of collapse or prone to more frequent blockages due to pipe defects. These lines will then be prioritized and placed on the City’s CIP Plan.

All major industrial users within the City’s service area are identified as part of an initial occupancy inspection by the Department of Public Works. Accordingly, these customers must complete an Industrial Waste Discharge Permit application with the Sanitation Districts of Los Angeles County (LACSD). This application includes a wastewater sewerage plan showing sewers and associated facilities for the handling of industrial wastewater from the point of origin to the public sewer connection, and identification of all wastewater generation processes. When applicable, additional plans containing spill containment systems, grease interceptors and/or flow measurement systems are included. The City requires all new restaurants to install Grease Interceptors. Sand and Grease interceptor inspections are conducted by the City of Vernon Department of Health & Environmental Control, with each inspection logged in the City’s Tyler database.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 45 of 50 ends

In order to monitor the implementation and measure the effectiveness of the SSMP, the City tracks several performance indicators. These indicators are recorded as outlined in Section 10 (Documentation) of their Sanitary Sewer Overflow Response Plan (Appendix G). Performance indicators include:
o Location of all SSOs over the past 12 months;
o Number of SSOs over the past 12 months, distinguishing between dry weather overflows and wet weather overflows;
o Volume distribution of SSOs (e.g. number of SSOs < 100 gallons, 100 to 999 gallons, 1,000 to 9,999 gallons, > 10,000 gallons);
o Volume of SSOs that was contained in relation to total volume of SSOs; o SSOs by cause (e.g. roots, grease, debris, pipe failure, pump station failure, capacity, other);
o Number of Interceptors inspected over the past 12 months; o Miles of gravity mains cleaned over the past 12 months; o Percentage of total gravity mains cleaned over the past 12 months; In order to keep the SSMP up to date, the City has assigned a staff member to review the SSMP annually. In addition to tracking the above performance indicators, the staff member will review all sections of the SSMP for effectiveness and timeliness. Collection system personnel will also be consulted annually to review the effectiveness of the SSMP, and help identify potential areas for improvement.

In summary, the City maintains a Monitoring, Measurement and Program Modifications which meets the requirements of Attachment D, 9 Monitoring, Measurement and Program Modifications of SWRCB Order No. 2022-0103-DWQ:
o The City tracks the location and cause of all SSOs, blockages, and gravity main hot-spots.

The City maintains a database of all cleaning activity which details the time, date and location of each pipe cleaned, as well as remarks noted by the sewer crew. The City maintains records all preventative maintenance and work orders. The City also maintains a database which documents the condition and maintenance history of each City owned manhole.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 46 of 50 ends

o The City maintains a map and list of sewer hotspot locations. The current map and list for year 2026-2027 is included in Sanitary Sewer System Hotspot Maps and List, Appendix L. o The City monitors the implementation of the SSMP, and measures the effectiveness of each element by SSMP by developing and tracking performance indicators every three years;
o By tracking performance indicators, the City is able to assess the success of their preventative maintenance program;
o The City has assigned a staff member to review the SSMP annually, in order to update all program elements as appropriate. In addition to tracking the above performance indicators, the staff member will review all sections of the SSMP for effectiveness and timeliness. Collection system personnel will also be consulted annually to review the effectiveness of the SSMP, and help identify potential areas for improvement; and o The City tracks the location and volume of all SSOs, as outlined in Section 10 (Documentation) of the Sanitary Sewer Overflow Response Plan (Appendix G). The City calculates the frequency of their SSO’s from these records.

9.2 COMPLIANCE DOCUMENTS
The following documents allows the City to comply with the Monitoring, Measurement, and Program Modifications requirements of the WDR, and are attached as appendices. o Sanitary Sewer Overflow Response Plan, Appendix G.
o Sanitary Sewer System Hotspot Maps and List, Appendix L.

9.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

9.3.1 Sanitary Sewer Overflow Response Plan (Appendix G) The Sanitary Sewer Overflow Response Plan serves as the guideline for the standard operating procedures in the event of a non-hazardous material SSO, including relieving the sewage blockage and spill containment.
o Section 10 of the City’s Sanitary Sewer Overflow Response Plan states the information required as part of the documentation for each sanitary sewer overflow.

9.3.2 Sanitary Sewer System Hotspot Maps and List (Appendix L) A map showing the City maintenance and inspection sections, a map showing the hotspot sections, and an associated list showing current hot spots are included.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 47 of 50 ends

ELEMENT 10. INTERNAL AUDITS
The City’s SSMP Program Audits addresses the mandatory SSMP element outlined in Attachment D, 10 Internal Audits of SWRCB Order No. 2022-0103-DWQ. This Order is attached as Appendix A.

The Internal Audits encompass the following component:
o Include internal audit procedures, appropriate to the size and performance of the system, for the City to comply with Section 5.4 (Sewer System Management Plan Audits) of the General Order.
a. Conduct an internal audit of its SSMP, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the City’s last required audit period. b. At a minimum, the audit must:
• Evaluate the implementation and effectiveness of the City’s Sewer System Management Plan in preventing spills;
• Evaluate the City’s compliance with the General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

10.1 COMPLIANCE SUMMARY
The City will conduct an internal audit of their SSMP every three years, and focus on the effectiveness of the SSMP and the City’s compliance with the SSMP requirements of Order No. 2022-0103-DWQ. The audit will include, but may not be limited to, the following:
o Any significant changes to components of the SSMP, including but not limited to, Legal Authority, FOG Control Program or Overflow Emergency Response Plan. o Any significant changes to the referenced compliance documents, presented as Volume II of the Sewer System Management Plan.
o SSMP implementation efforts over the past three years; o A description of additions and improvements made the sanitary sewer collections system during the past three years;
o A description of the additions and improvements planned for the upcoming three years, with and estimated schedule for implementation.
o Strategies to correct deficiencies, if identified, will be developed by the responsible City City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 48 of 50 ends

division.

10.2 COMPLIANCE DOCUMENTS
There are no compliance documents for this section.

10.3 DOCUMENT DESCRIPTIONS
There are no document descriptions for this section.

City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 49 of 50 ends

ELEMENT 11. COMMUNICATION PROGRAM
The City’s Communication Program addresses the mandatory SSMP element outlined in Attachment D, 11 Communication Program of SWRCB Order No. 2022-0103-DWQ. This Order is attached as Appendix A.

The Communication Program encompass the following component:
o Procedures for the City to communicate with the public for:
a. Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
b. The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates. o Procedures for the City to communicate with owners/operators of systems that connect into the City’s system, including satellite systems, for:
a. System operation, maintenance, and capital improvement-related activities.

11.1 COMPLIANCE SUMMARY
The City will communicate on a regular basis with interested parties on the implementation and performance of this SSMP. The communication program allows interested parties to provide input as the program is developed and implemented.

The City will make the SSMP available to the public on the City website. The City anticipates agendizing the SSMP at a City Council Meeting, thereby providing the opportunity to comment on the implementation and performance of the SSMP.

Additionally, the City Website allows the public to report any complaints or concerns for nonemergency and urgent requests. Information on how to place complaints or service requests can be found on the City website.

The public also has access to the Department of Public Works phone number or can call the Police Department’s non-emergency number at (323) 587-5171 anytime, 24/7, and report the activity.

11.2 COMPLIANCE DOCUMENTS
The following documents are readily available to the general public, and have therefore not been attached as appendices:
o Request for Non-Emergency City Service and Urgent Requests, https://www.cityofvernon.org/government/public-works-division/request-for-nonemergency-city-service City of Vernon
Sewer System Management Plan, Volume I
Update Report
August 2026

Page 50 of 50 ends

11.3 DOCUMENT DESCRIPTIONS
A description for each compliance document listed above is described below:

11.3.1 Request for Non-Emergency City Service and Urgent Requests Link: https://www.cityofvernon.org/government/public-works-division/request-for-nonemergency-city-service “Request for Non-Emergency City Service”
Please use the form below to place a Non-Emergency City Service Request. Examples include potholes, graffiti removal, code violations, etc.
“For Urgent Requests”
If reporting a hazardous condition, please call (323) 826-1461.

Examples of Urgent Requests
o Report Traffic Sign down or missing: (Stop sign, Do Not Enter, Yield, Hazard signs, One Way, No Right/Left Turn, Keep Right)
o Traffic and pedestrian signal outage and malfunction
o Street lights out at an intersection
o Debris in roadway
o Tree blocking roadway or sidewalk
o Manhole cover missing
o Severe sidewalk, curb, and gutter damage
o Street flooding or plugged catch basin
o Hazardous waste spills
o Sewer backup, overflow, odor, vermin
o Water line break
o Drainage problems

CITY OF VERNON
Sewer System Management Plan Update
Volume II
August 202
Prepared by:

CITY OF VERNON
Public Works Department
Engineering Division
City of Vernon
Sewer System Management Plan, Volume II
Update Report
August 2026
APPENDIX A – STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. 2022-0103-DWQ
APPENDIX B – SANITARY SEWER SYSTEM INDEX MAP
APPENDIX C – CITY OF VERNON ORGANIZATIONAL CHART
APPENDIX D – PUBLIC WORKS ORGANIZATIONAL CHART
APPENDIX E – TELEPHONE DIRECTORY
APPENDIX F – LOS ANGELES COUNTY FIRE DEPARTMENT HAZARDOUS

MATERIALS INCIDENT PROCEDURES
APPENDIX G – SANITARY SEWER OVERFLOW RESPONSE PLAN
APPENDIX H – CITY OF VERNON STANDARD DRAWINGS
APPENDIX I – LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

STANDARD DRAWINGS
APPENDIX J – SEWER AND STORM DRAIN PROGRAMMED MAINTENANCE SYSTEM APPENDIX K – PUBLIC OUTREACH FOR FOG CONTROL
APPENDIX L – SANITARY SEWER SYSTEM HOTSPOT MAPS AND LIST APPENDIX M – INDEPENDENT COLLECTION/DISPOSAL SERVICE VENDOR LIST APPENDIX N – 2008 SEWER SYSTEM HYDRAULIC ANALYSIS
City of Vernon
Sewer System Management Plan, Volume II
Update Report
August 2026

APPENDIX A

STATE OF CALIFORNIA WATER RESOURCES CONTROL
BOARD ORDER NO. 2022-0103-DWQ

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August 2026

APPENDIX B

SANITARY SEWER SYSTEM INDEX MAP
RIVER
L. A.

L. A. RIVER
L. A. RIVER

FRUITLAND AVENUE
25TH STREET 27TH STREET 28TH STREET 30TH STREET ROSS STREET 26TH STREET 37TH STREET 38TH STREET VERNON AVENUE 45TH STREET 46TH STREET 48TH STREET 49TH STREET 51ST STREET 52ND STREET 55TH STREET 57TH STREET ANDERSON VERNON AVENUE 44TH STREET 46TH STREET LEONIS BOULEVARD 50TH STREET

SOTO STREET

BOYLE AVENUE

ALCOA AVENUE

SEVILLE AVENUE

SANTA FE AVENUE

ALAMEDA STREET

DOWNEY ROAD

HAMPTON STREET
1ST ST.
2ND ST.

PACIFIC BOULEVARD
IRVING ST.

ROSS STREET SLAUSON AVENUE
MALBURG WAY 52ND STREET
hawthorne
ST. CHARLES

SIERRA PINE AVENUE

INDIANA AVENUE

BONNIE BEACH PLACE

AYERS AVENUE

SUNOL DRIVE

BANDINI BOULEVARD

AYERS AVENUE
26TH STREET

WASHINGTON BOULEVARD

ATLANTIC BOULEVARD

MAYWOOD

MAYWOOD AVENUE

EVERETT AVENUE

EVERETT COURT

LOMA VISTA AVENUE

CHARTER

EXCHANGE AVENUE
48TH STREET 49TH STREET 50TH STREET

DISTRICT BOULEVARD

FRUITLAND AVENUE

CORONA AVENUE

GIFFORD AVENUE

EVERETT AVE
LOMA VISTA AVE CHAMBERS 45TH STREET

SEVILLE AVENUE

MINERVA

HARRIETT

BANDINI BOULEVARD

FRUITLAND AVENUE

BOYLE AVENUE

DOWNEY ROAD
ALCOA AVENUE 27TH

MALBURG WAY
54TH STREET

BICKETT STREET
37TH STREET PACIFIC BOULEVARD

DISTRICT BOULEVARD
49TH STREET

BOULEVARD

DISTRICT
STREET
ST.

BOULEVARD
26TH STREET

WASHINGTON

SOTO STREET
VERNON AVENUE 53RD STREET 54TH STREET 55TH STREET 56TH STREET 57TH STREET 58TH STREET 44TH STREET PACKERS AVENUE 45TH ST SACO ST.
malabar
DEKALB DEKALB 49TH STREET

JEWEL AVENUE

HELIOTROPE
52nd SLAUSON AVE

MAYFLOWER
KING
SLAUSON AVE.
52nd

ALAMO STREET

ALAMEDA STREET

L O N G

B E A C H
F R W Y . - 7 1 0 SCALE IN FEET 0 600 DATE DESCRIPTION INITIALS REVISIONS STORM DRAIN SYSTEMS LEGEND D1856 D1794D1857 D631 D1872 D431 D431 D1165 D431 D774 D755
D1641 D1929 D535
D535
D535
P2035 D434 D1846 D1995
D2008 P1707 D1770 D535 D426
P320
D419 WS1600
D1814
S1593
D1854
D1855 D2015 P327 D2048 D2012 D412
D1855 D2270 D2273 D1853 D1031
WS1365 D428 D429 P1544 D430 D1092 D1063 D616
P1578
P1578 D1088
D616 D616
D782 P1407
D436
D2104
D2110
D2212
D2037
D2029
D2235 C.M.D.

D1901
D2078
D2093
D2045
D2038
D1636
D1902
D1838
D2062
D1878
D2074
D2072
D1602 10
8 11
7 12
613
5 14
4 15
3 16
2 17
1 18
9 CITY CATCH BASIN WITH CPS UNITS COUNTY CATCH BASIN WITH CPS UNITS GRATE WITH CPS COMBINATION CATCH BASIN & MANHOLE MANHOLE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT CITY OF VERNON 22 21 23 24 20 19 25 26 27 38 39 29 28 37 31 30 35 36 33 32 34 41 42 40 1615 1 14 2 13 1712 3 1110 4 5 9 6
8 7 28 27 26 25 29 30 31 23 22 24
1 21
2 20
3 19
4 11 10
5 6
9 7 8 12 18 17 13 14 15 16
7 6
8 5
1 4
2 3
1 210
9 3 4 5
8 7 6
1 10 11
2 8
3 7 6 5
4 5
4 3
2 6
1 7
89 10 32 13 14 12 15 11 10 16
9 17 18 8 7
6 3
2 1
5 4 2322 1920 2728 2629 2530 2431 21 11 10
1 9
2 3
8 4
5 6
7 45 28 29 0027 30 19 44 18 16 17 43 2625 3135 32 34 33 37 36 38 24 39 23 40 1341 1242 11 10 9 8
7 6
5 4
3 2
1 22 14 21 15 20
7 9
1 6 10
811 1214 13
2 3 5
4 15 16 11 10
9 8
7 1
6 5
2 3
4 7
6 5
8 4
910
1 11 12 19 13 18 17 14 16 15
2 3
1 2 11
9 8 7
6 5
4 3
2 12
1 39
1 2 38
3 37
4 36
5 35
6 34 33 32
7 8 31 30
9 29 10 28 11 27 12 26 13 25 14 24 23 15 16 22 17 21 18 20 19 9 1
8 2
7 3
4 5
6 3
2 4
5 1
6 9 10
811
7 12 18 19 17 20 16 21 15 14 13 22 23 2425 28 27 26
8 7
6 5
4 3
1 2 10
9 1
4 3
5 6
7 8
2 24 1 15 24 24 15
15 15 24 36 36
36 45 45 15 39 42 39 45
12 36
12 30 30 18
8 27 24 2115 15 15 24 42 42 36 30 30 27 21 36 36 33 30 24 39 36 33 27 24 21 21 18 18 18 24 30 33
36 39
42 10 18 12 15 15 18 21 36
10 24 D616 18 18 18 33 36 45 36 48 42
33 42 17 42
45 X 45
45 X 42 P1544 12 24 30 39 51 33 36 36 39 42
27 30
30 33
36 42
45 45
48 51 51
24 27
30 36
24 24
24 27
30 33
39 42
24 24
24 27
36 36
24 D2234
P1670
d1645
39 36
39 42
24 24
24 24
33 36 D1704 D1704 P1724 10' X 12'
P V
T D1770
D1770 39 33 39 27 24 18
60 51 60 39 57
D1770
51 57
51 D1982 D535D1982 D432 75 72 75 24 54 60 66
39 18
D1854
24 30 30 36
24 30
33 24 27 30
39 42
D1854 Proj 4250 Line C D1854 36 66
36 39 D1855
39 78 D1415
D1853
24 D2275
D1853
33 D1415 81 96 D1415
Proj. 4250 LINE B D1415 96
D1415
120 X 75
P2109
87 X 66
D1855
24 30 33
36 D1855 D1855
24 30
33 36 39 39 48 45 D1853
D1853
24 27 30 33
36 39 39 42 42 45
15 L.A.C.F.C.D.
30 30
39 45
45 21
54 D1770 D1770
24 30
33 36
42 42 D1855 63 66 57 60 39
63 9630 36
63 D1855
D1770

OPEN CHANNEL
D1855
D1855 39 42 48
48 24" 15" PVT. DRAIN
168 X 102 D1556
D1854
D2042
D1854
24 30
33 36
36 18
39 42
45 45
45 57
60 60
63 63
D1555
144 x 78 singles
D1701
30 P1775 15
168 x 84 D1451
D1559
87 78
Proj. 5206
120 x 108
144 x 120
48 30 24
Proj. 4250 Line F P1512
14 27 33 33 48 48
39 45 45
24 12
D2044
24 D1770 24 33
33 36 36 39
39 60 D1770 D1432 60 63 66
72 75
county Proj 1
WASHINGTON SUMP D2009 PVT.CB PVT.CB PVT.CB
42 SEC. 1 SEC. 2 SEC. 3 SEC. 4 SEC. 5 SEC. 6 SEC. 7 SEC. 8 8-B 8-A 8-C SEC. 9 SEC. 10 SEC. 11 SEC. 12 SEC. 13 SEC. 14 SEC. 15 SEC. 16 SEC. 17 SEC. 18 SEC. 19 SEC. 20 SEC. 21 5-02 W.C. D429 D2504 48 9 P1775 27 33
51 3334 353637 3839 DESIGNED CITY OF VERNON L.A. RIVER
129x102
174x126
double
174x126 DD1-26 RELIEF TRUNK
P1634
P1634
D1652 43
double 144x78 D1555 CITY CATCH BASINS WITHOUT CPS OR ARS (P2326) (P2175) 9-06 UPDATES & ANNEXED AREA L.M.

LOMA VISTA AVENUE DRAIN
PLAN No. 488-D1.4 SHEETS 4 & 5 OF 12
D-2624
D-2624D2620
D2620
18 24
24 36
15 1
2 3 SEC. 22
1 SEC. 23
PENNINGTON WY. 3-09 PENNINGTON WAY UPDATE E.S.
2 3
4 26th St. SUMP STATION 2120 2322 25 24 27 26 28 29 31 30 33 32 35 34 37 36 39 38 2 1
4 3
6 5
8 7 10
9 12 11
2 1
3 3-09 26TH ST. CATCH BASINS E.S. PIRVATE DRAIN
OPEN CHANNEL SEC. 25 SEC. 24
D2636
D2630
D2628
D2629
5 24
24 24
36 30
27 24
24 24
30 24
24 PIRVATE DRAIN
4 5 CITY OF VERNON BOUNDRY 30 27 33 8-09 CATCH BASIN TRASH EXCLUDER'S E.S. * * COUNTY CATCH BASINS WITHOUT CPS OR ARS * 7-09 27TH ST. CATCH BASINS UPDATE E.S.

D1432
D-2041
D-2041
D2532
D2621
D2644
D2666 D2672 15
5 6
7 8
9 4 11 12 13 14 7-10 UPDATED SEC. 22 E.S. 10 1617 18
* *
* *
*
*
* *
*
* * *
*
*
* *
*
*
1751-19
1751-20
1751-21
1806-181 1751-27 1806-222
1806-180 1751-??? 1751-29 1751-30 1751-43 1751-50 1752-1 1752-12 1752-15 1752-23 1752-27 1752-24 1752-29 1752-32 1752-25 1752-34 1752-35 1752-36 1752-39 1752-40 1752-41 1752-44 1752-33 1752-26 1752-37 1752-38 1752-42 1752-43 1752-45 1752-54
1752-55
1752-56 ?? 1752-471752-48 1752-50 1752-51 1752-52 1752-67 1752-66 1807-257 1807-258 1807-260 1807-259 1807-105 1807-115 1807-25 1807-116 1807-114 1807-92 1807-79 1807-251 1807-250 1807-93 94 1807-27 1807-117 1807-128
1807-129 130 120 118 1807-119 1807-131 1807-110 1807-100 1807-106 1807-111 1807-97 1807-95 96 98 99 1807-80 1807-76 1807-126 1807-136 1807-137 1807-138 1807-132 1807-133 1807-139 1807-122 1807-121 1807-121-B 1807-121-A 1807-107 1807-108 1807-112 1807-113 1807-124 1807-135 1807-141 1807-123 1807-134 1807-103 1807-104 1807-140 1807-101 1807-102 1807-91 1807-89 1807-87 1807-88 1807-90 1807-86 1807-72 1807-73 1807-69 1807-68 1807-83 1807-84 1807-82 1807-67 ?? 1807-74 1807-63 1807-62 1807-71 1807-70 1807-280 1807-61 1807-64 1807-65 1807-66 1807-41 1807-42 1807-571807-56 1807-58 1807-59 1807-53 1807-54 1807-60 1752-16 1752-19 1752-18 1752-20 1752-22 1752-21 1752-13 1752-4 1752-4A 1752-6 1752-7 1752-5 1752-10 1752-9 1752-11 1752-8 1807-146 1807-145 1807-147 1807-148 1807-181 1807-180 1807-182 1807-192 1807-191 1807-183 1807-184 1807-185 1807-26 1807-52 1807-30 1807-30 1807-186 1807-194 1807-201 1807-200 1807-193 1807-149 1807-150 1807-151 1807-?? 1807-?? 1807-?? 1807-?? 1807-217 1807-218 1807-219 1807-220 1807-222 1807-221 1807-233 1807-234 1807-233-B 1807-239 1807-238 1807-222-a 1807-222-b 1807-222-C 1807-222-D 1807-222-E 1807-222-F 1807-248 1807-247 1807-246 1807-?? 1807-249 1807-?? 1807-223 1807-2061807-225 1807-227 1807-224 1807-2261807-207 1807-199 1807-198 1807-197 1807-284 1807-190 1807-189 1807-33 1807-29 1807-26 1807-17 1807-24 1807-23 1807-3 1807-4 1807-28 1807-27 1807-31 1807-32 1807-187 1807-188 1807-195 1807-205 1807-51 1807-13 1807-50 C2-SP7 1807-46 1807-12 1807-11 C2-SP6 1807-45 1807-4 1807- 1807-1 C2-SP3 1807-2 1807-3 1807-5 1807-6 1807-7 1807-8 1807-47 1807-14 1807-48 1807-15 1807-9 1807-49 1807-10 1807-18 1807-19
1807-20
1807-21 1862-205 1862-50 1862-52 51- 53- 206- 1807-22 1862-54 1862-11 1862-141862-15
1862-13
1862-12
1862-10
1862-8
1862-6
1862-5
1862-3
1862-47
1862-45
1862-46
1862-4
1862-7
1862-9
1862-44
1862-43 1862-42 1862-41
1862-39
1862-40
1862-38
1862-37 ?? ??
1862-36
1862-34
1862-32
1862-31
1862-28
1861-174
1861-172
1861-173 1861-169 1861-170 1861-171
1862-29
1862-30
1862-33
1862-35 1861-168
1861-167
1861-165
1861-163
1861-162 1861-161 1861-166
1861-160
1861-159
1861-158
1861-157
1806-175
1861-156
1806-134 1806-132
1806-1331806-131 ???? A2-SP5 A2-SP6 A2-SP4 ?? 1806- ?? ?? ?? 1806-1631806-166 1806-165 1806-641806-176 1806-149 1806-147
1806-148
180-6150
1806-151
1806-166
1806-175
1806-173
1806-174
1806-164
1806-165
1806-171
1806-172
1806-161
1806-162
1806-163
1806-154
1806-153
1806-159
1806-160
1806-199
1806-158
1806-155
1806-156
1806-157
1806-146
1806-143
1806-145
1806-144
1806-142
1806-141
1806-139
1806-140
1806-138
1806-137
1806-135
1806-136 ?? ?? 1806-113 1806-210 1806-111 1806-212 1806-218 1806-219 1806-221 1806-220 1806-216 1806-217 1806-215 1806-207 1806-212 1806-213 1806-214 1806-206 1806-204 1806-205 1806-125 1806-197 1806-196 1806-123
1751-288-A 1806-127
1806-122 1751-42 1751-192
1751-35
1751-36
1751-37
1751-38
1751-191 1751-33 1751-34 1751-41 1751-40 1751- 47 1751-49 1751-48 1751-46 1751-44 1751-45 1751-39 1751-31 1751-32 1807-85 46 1807-78 1807-288 1807-142 1807-287 1807-77 1807-81 1806- 1806- 1806-200
1806-201
1806-202
1806-203 1806-120-A 1752-2 1752-3 1752-14 1752-31 1752-30 12-10 ADD COUNT C.B. NUMBERS M.D. 1862-157 1862-186 ?????? 1806-160A 1806-162 ?? 1807-252 1861-164 3-11 UPDATE COUNT C.B. NUMBERS M.D. *
*
*
*
*
*
* * * * * * *
* *
* *
* *
* *
* *
* *
* *
* *
* * * *
* *
*
*
*
*
*
*
* * * *
*
*
* *
* * C2-SP5
*
*
*
* 1806-C3-SP2 1862-C3-SP31862-C3-SP4 1807-75 1807-94
*
*
*
*
*
*
* * * * CITY CATCH BASIN WITH ARS UNITS * * COUNTY CATCH BASIN WITH ARS UNITS * * GRATE WITHOUT CPS * * * *
* *
* * * * * * *
* *
* *
* *
* *
* *
* * * *
*
*
*
*
*
*
*
*
*
*
* * * *
* *
* *
* *
* *
*
*
1751-22
1806-223
1806-225
1806-226
1806-227
1806-228
1806-404
1806-224
1750-25
1751-26
1751-1231751-24 1751-28
D1982 1752-17 1807- 1807- 1807- 1807- 1807- 1807- C2-SP2 1806- 1806- 1806- A2-SP7 A2-SP8 1806-177 178 1806-167
1806-168
1806-169
1806-170 1-13 UPDATE all C.B. NUMBERS E.S. 45" RCP outlet d426-1 45" RCP outlet d434-1 48" RCP outlet d1846-4 36" RCP outlet d430 45 x 48" RC box outlet d436-1 12" RCP outlet 51" RCP outlet d2029-3 51" RCP outlet d1901-12 39" RCP outlet d1636-3 30" RCP outlet field verified 30 24 G2488 4OF4
*
*
*
* * 6-14 UPDATE C.B. TOTAL COUNT E.S.
1751-121 1752-46
1752-49 13 14 15
*
*
1751-288-B
1751-288-C 1807-233-a *
* 1806-198
SEC. 22 COUNTY MANHOLE 1A 1B 1C 1D 1E 1F 5-25 1 ST. CATCH BASINS C.V SCALE IN FEET 0 600 DATE DESCRIPTION INITIALS REVISIONS 25TH STREET 27TH STREET 28TH STREET 30TH STREET ROSS ST. 26TH STREET 37TH STREET 38TH STREET VERNON AVENUE 45TH ST. 46TH ST. 48TH STREET 49TH STREET 51ST STREET 52ND STREET 55TH STREET ANDERSON AVE 44TH STREET 46TH STREET LEONIS BOULEVARD 50TH STREET FRUITLAND

SOTO STREET

BOYLE AVE

ALCOA AVE

SEVILLE AVENUE

SANTA FE AVENUE

ALAMEDA STREET
DOWNEY RD.

HAMPTON STREET
1ST ST.
2ND ST.

IRVING ST.

ROSS STREET SLAUSON AVE
MALBURG WAY 52ND STREET

HAWTHORNE
ST. CHARLES

SIERRA PINE AVE

INDIANA AVE
BONNIE BEACH PL.

AYERS

SUNOL DRIVE

BANDINI BOULEVARD

AYERS AVENUE
26TH STREET

WASHINGTON BOULEVARD

ATLANTIC BOULEVARD

MAYWOOD

MAYWOOD AVENUE

EVERETT AVENUE

EVERETT COURT

CHARTER

EXCHANGE AVENUE
49TH STREET 50TH STREET

FRUITLAND AVENUE
CORONA AVE.

GIFFORD AVE.

EVERETT AVE.

LOMA VISTA AVE. CHAMBERS45TH STREET

SEVILLE AVENUE

MINERVA

HARRIETT

BANDINI BOULEVARD

FRUITLAND AVE

BOYLE AVENUE
DOWNEY RD.

AVENUE 27TH

MALBURG WAY
54TH STREET
BICKETT ST. 37TH STREET PACIFIC BOULEVARD
49TH ST.

DISTRICT BOULEVARD

BOULEVARD

DISTRICT
ST.

AVENUE

BOULEVARD
26TH STREET

WASHINGTON

VERNON AVENUE
SOTO STREET 53RD STREET 54TH STREET 55TH STREET 56TH STREET 57TH STREET 58TH STREET 44TH ST. PACKERS AVE. 45TH ST.

SACO ST.

MALABAR
DEKALB 49TH STREET
JEWEL AVENUE LEGEND S174 S340
S1928 S1597
S2105 C.M.D.

HELIOTROPE
52nd CITY OF VERNON MANHOLE OTHER COUNTY SANITATION DISTRICT LINES 8" 30" 8" P V
T SLAUSON AVE 15" COUNTY MANHOLE

MAYFLOWER
KING
SLAUSON AVE.
52nd

ALAMO STREET STREET AVENUE

L O N G

B E A C H
F R W Y . - 7 1 0 57TH
S138
S166
S2112
8"
8"
8"
S136B 10" 10" S136B 10" 12" 8" 10" 12"
S1603
8"
S142 8" 8"S411 S1983
S2396 8"
S862 8" 8" S178 15" 8"
S1829
8" 8" S170 FURLONG PVT 8" S141 8" S1779
S141 8" S17798" S175 8" 8" S1954 8" S174 8" S154 8" S156 8" S155 8" S158 8" S1578" S160 18" S161 20" 18" S1858 8"
8" S2027 S161 18"
S1593 8" 10" S1931
16" S133
10" 16" S164
S145
10"
S146
8"
S147 14"
S149
30"
S149 16"
S149
16" 8" S179 15" S1983 8" S180 8" S182 8" S184S1465 10"S1465 10" 12" 27" S110A S129
8" S129 14" 10"S173 8"
S139 8"
S1026
8" 16"
S129 12" 10"
S129
10" 8" S171 8" S176
8" S1102
10" 8" 16" 14" S164 8" S165A 15" S165
S132 12" 12"
S132
10" 10"
S1105
8" 8" S1105
8"
8" 21"
18"
12"
S1463 S1844 8" S1465 10" S2193 10"
S110B
27"
S128
8" S1231
8" S1171 8" S176
8" 10"
S131 8" 10" S153
S131
S130A
8"
8"
10" 8" S578
S130
S130
12" 12"
S131 8" 8"
S1464
8" S1471 8" VERNON 15" 15" 18" 10" S169 18" 10" S1091 10" S1062 8" 8" S1003 10" 8" S1003 8" S151 8" S163 12" S159A 14" S159 14" 15" S159 15" 10"
S140 8" 18" S136A 8" S163 8" S151
18" 18"
S137A
10"
S135
15" 15" 14" 14" 12" S610
S137
12" 8" 10" S1246
10" 10" S1087 21" S1471 24" 8" S169 21"
10"
10" 12" 12"
14"
12"
S137
12" 14" 8" S1596S169
24" 8"S1831 12" S1790 8" 8"12" S1790 8" S610 8" S9478" S151 8" S163 S1472
24" 14" S167
S134 8" 10" 12" 10"
14" S134 12" S1489
S1490 8"
12" 8" S2355
6"
S1895
8" 8"
S1895
8"
S1489
15"
S1469
8" 12" 8" 15" S1539
10"
S1488
8"
S1487
12"
8"
S1759
12"
15"
S1487
15"
15" S1759
15"
S1562
12"
15"
S2100
10"
S1550
15"
S2277
12"
S2092
8"
S1548
8"
S1549 10"
S1568
8"
S1567
10"
S1584
8"
S1582
8"
8"
S1583 10"
10"
S1585 8"
S1582
8"
S1515 10"
S2092 12"
S1548 8" 10"S2064
10"
8"
S2017
8"
S2018
12"
15"
12"
12"
S2124 8"
8"
S2013
12"
S2513
10"
12"
S2514
8"
10"
12"
S2127
10"
8"
S2205
S2129
15"
15"
8"
8"
12"
15"
18"
18"
12"
10"
S2128
12"
12"
8"
15"
18"
21"
24"
12"
8"
S2025 8" 8" S1761 10" S185 8"
S1588 18" 36" S109 36" S109
S110B
18" & 24" S830
27" S1050 15" 18"
S1133 PVT. 8" 12" 12"
12"
S1050
18"
21"
21"
S1560 24" S136A 24" ALCOA
S163 21"
S1586
8"
12"
S2260
4"
S1643
8"
8"
18"
18"
21"
21"
24"
24"
21"
21"
21"
24"
S1875 CITY OF VERNON MAIN LINE 8" S1360 8" S1295 8" S283 1 2
313 12
11 10
9 8
7 6
5 4 14
15 16
17 18
19 2025 24
23 22
21 31 30
29 28
27 26 32 36 35
34 33
40 39
41 37
48 47
46 45
44 43A
43 38 49 42505152 99
98 97
96 95
94 93 929190 88 87 86 85 84 A 8489
81 82 8380 79 78 7776
58 59
60 6157 566263646566
75 74
73 72 71 67 706968
55 54
53 111 108
106
105
104 107 110 113 109 112
120 127 117 116 118 119
121
126
115
122
123
124
125
131
130
129
128
114 103 102 101 100
2 3
4 5
1 6
781314152122 23 16
9 10
11 12
17 18
19 20 120 121 122 123 124 125 126
132
131
133
141
140
135A
135
134 139 138 136 137 130 128 129
142
119
118 117
116
115
111 110
109 112 113 114
108
107
106
105
104 81
67 6665 26
25 24 646357564847 3562554634
33 28
30 31
32 29
39 37
38 36
49 50
51 54
53 52
45 4442 41 40
91 92
93 94 99 100 96
95 9798
68 69
70 71
72 73 74 7576 777879 103 80 102 101 9089 88 87 86
85 84
83 82
61 60
59 58 43
1 2
3 5
4 6
7 8
9 10
11 16
17 18
22 23
24 25
26 27
28 29
38 1314 15 12 19 20 21
30 31
32 33
34 35
36 37 40 41
39 1
2 1
2 3
4 4 A
1 2
3 4
5 6
7 8
916 1718 22232427
10" 2829303132
12 11
10 15
14 13
21 20
19 74
75 76
26 25
80 81
82 83
33 34
35 36
37 38
39 40
64 65
66 62
63 67
68 69
52 53
54 55
56 57
43 44
45 46
47 48
49 414250515859606170 717273 77787984858687888990919293949596 10 11
12 13
14 15
16 17
18 20
21 22
23 24
1 2
3 4
5 6
7 8
9 25
27 28
28 A
29 30
31 32
34 35 33
26 3642 4337
46 45
44 47
48 39
38 40
41 49505152535455565758
1 2
3 4
5 6
7 9
8 11
12 13 14 101516
17 21
18 19
20 222324282935
30 31
32 33
34 39 363738
40 41
42 43 4445464748495051525354
25 26
27 8
91011
7 6
1 2
3 5 12
13 1417 1615
18 19 2425262729
30 31
32 333435363738394051
1 2
3 4
5 6
8 9
7 11
10 12 13 14
18 19
15 16
17 2024
21 22
232526272833
29 30
31 32 3435
36 37
38 3940
40 A
40 B
40 D 424344454647484950 41 51
55 54
53 52
1 2
3 4
5 6
7 8
10 11
12 13
14 15
16 17
22 23
24 18
9 19
20 21
2 1
2 3
2 3
6 5
4 1
1 1
2 3
4 15
14 11
12 13
10 8
9 7
6 5
4 3 2
1 3
2 1
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15
1 3
2 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20
6 7
8 91011 12 13
14 15
1 2
3 5
6 4
7 8
9 10
11 12
12 A 13
14 15
16 17
18 19
20 21
13 A 14 A
103
105
107
33 34
104
102
108
112
110
111
113
114
115
116
117
118
75 76
99 100
101
51 52
53 54
55 56
57 58
59 60
80 82
62 61
64 63
65 66
67 68
69 70
71 73
74 72
84 120
123
88 87
89 90
92 93
96 97
98 91 91 B
91 A
95 95 A
94 B
94 A94
40 C 4142434445
46 47
48 49
50 20
21 22
23 69 4344 35
37 38
39 4645 47
48 49
40 41
42 3436
58 59
61 62 60
52 53
54 55
56 57
8 7
6 5
4 19
18 17
16 15
14 13
12 18" 4
5 6
7 8
28 32
31 30
29 26
25 24
23 22
43 42
41 40
39 38
37 45
44 35
56 55
54 53
52 51
50 49
29 30
3 8" S1677
5 6
7S1858
9 108" 68 67
14 15
16 13
S1563
8" 1
2 145
132
21 22
23 59
58 57
36 46
27 33 2
1 9
33 66 65 64 63 51 50 3231 2827262419
4 20
P757
83A SEC. 2 SEC. 3 SEC. 1 SEC. 4 SEC. 5 SEC. 6 SEC. 7 SEC. 8 SEC. 9 SEC. 10 SEC. 11 SEC. 12 SEC. 13 SEC. 14
SEC. 15
SEC. 16
SEC. 17
SEC. 18
SEC. 19
SEC. 20
SEC. 21
SEC. 22
SEC. 23
SEC. 24 SEC. 25 S 2557
147
146
144
143
L. A. RIVER L.A. RIVER
L. A. RIVER
RIVER
L.A. 1-06 MAP UPDATE W.C. 3-08 CMD AREA MAP UPDATE E.S. 119 56A
106
109
85 86
122
121
S2123
12"
15"
S2513
21"
64C
64B
64D
64A
148
30 A 56 A 135 134 133
51A 51B
9 8
7 6
5 4 31-A 70 71 73 72 74 75 76 31-A 7778 3-09 PENNINGTON WAY. MAP UPDATE E.S.

PENNINGTON WY. 1-09 ALAMEDA AREA MAP UPDATE E.S.
12"
12" 1-10 PACKERS SEWER MAIN PRIVATE E.S.

MAYWOOD
42"
30" 30" 5-10 UPDATED SEC. 2,16 & 24 E.S.

S143
S143 10" S1861
C
C C
C
C C
C
C
C
C
4 C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
22 C CITY CONNECTION TO COUTNY 149 CITY OF VERNON 3-20 8-24 New Sewer main on 1st and MH #149 Section 10 - MH #19 Remove C.V. C.V. SANITARY SEWER SYSTEMS 59 27 44 MILES OF SEWER (MAINTAINED BY THE CITY) 276 CITY-OWNED MANHOLES 180 COUNTY OWNED MANHOLES 27 CITY MAIN CONNECTION INTO COUNTY Sec. 2 CITY OF VERNON maintenance zones Sec. 1Sec. 3b Sec. 3A Sec. 5 LEGEND: SECTION 1 SECTION 2 SECTION 3A SECTION 3B SECTION 4 SECTION 5 Sec. 4 Miguel Bribiesca (323) 974-1480 Martin Gutierrez (323) 514-4229 Martin Vazquez (213) 259-4858 Martin Vazquez (213) 259-4858 Gustavo De Loza (323)430-3955 Carlos Espinoza (323) 974-2387 04/21/2026 Graffiti Crew : Jose Zermano (323) 595-0056 Graffiti Crew : Adrain Loya (323) 974-2383 Sign Crew : Jerry Alvarado (323) 383-8684 CODE ENFORCEMENT : SECTION 1-2-3A ANGEL RIVAS (213) 348-4135 CODE ENFORCEMENT : SECTION 3B-4-5 TONY CLARKe (213) 255-9816 Section # of COV MH # of County MH
1 72 12
2 8 1
3 49 7
4 137 16
5 150 3
6 41 21
7 2 1
8 5 6
9 96 1
10 52 10
11 54 1
12 53 21
13 59 4
14 24 14
15 2 20
16 98 1
17 3 5
18 6 8
19 4 2
20 15 2
21 2 1
22 9 3
23 15 12
24 10 4
25 10 4
TOTAL 976 180
As of April 21, 2026
City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXC

CITY OF VERNON ORGANIZATIONAL CHART











!"#

"$
%&%'(%)
*+,

-
City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXD
PUBLIC WORI<S ORGANIZATIONAL CHART
Public Works — Organization Chart
Director of Public Works – City Engineer
Daniel Wall
Management Analyst
Dulce Gonzalez
Rosemary Lozada
Admin. Secretary
Cynthia Cano
Sr. Admin. Assistant
Yesenia Barajas
Management Intern, PT
Giselle Cruz-Pulido
Melanie Magana
Maria Torres
Admin. Assistant
Hannia Contreras
Engineering
Project Engineer
Lissette Melendez
Assistant Engineer
Carlos Velazquez
Engineering Aide
VACANT
Building & Planning Ops
Supervisor
Wesley Cruz
Assistant Planner
Sergio Canales
Code Enf. Officer
Angel Rivas
Tony Clarke
Permit Technician
Elizabeth Cuevas
Roger Bonilla
Public Works Superintendent
VACANT
Facil. Maint. Supervisor
Kenny Jackson
Lead Facil. Maint. Worker
VACANT
Sr. Facilities Maint. Worker
Jose Castaneda
Facilities Maint. Worker
Robert Aguilera
Facilities Maint. Worker
Aaron Flores
Facilities Maint. Worker
Matthew Davis
Facilities Maint. Worker
Eric Anderson
Fleet Supervisor
Jason Tomlinson
Lead Mechanic
VACANT
Senior Mechanic
Victor Enciso
Senior Mechanic
Rafael Cortes
Mechanic
Jorge Cruz
DRAFT — pending review.

Facilities Maint. Worker
Rick Cimarusti
Warehouse Worker
Ruben Herrera
Street Maint. Supervisor
Elias Zepeda
Lead Street Maint. Worker
Victor Vasquez
Sr. Street Maint. Worker
Carlos Gudino
Street Maint. Worker, PT
Gustavo De Loza
Sr. Street Maint. Worker
Jerry Alvarado
Sr. Street Maint. Worker
Martin Gutierrez
Street Maint. Worker
Adrian Loya
Street Maint. Worker
VACANT
Street Maint. Worker
Martin Vazquez
Street Maint. Worker
Guillermo Diaz
Street Maint. Worker
Carlos Espinoza
Street Maint. Worker
Miguel Bribiesca
Street Maint. Worker
Anthony Flores
Street Maint. Worker
Jose Ramirez
Street Maint. Worker
Ruben Hernandez
Street Maint. Worker
Erik Calderon
Street Maint. Worker, PT
German Ruiz
Street Maint. Worker, PT
Miguel Hernandez
Sr. Street Maint. Worker
Luis Cardenas
City ofVernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXE

TELEPHONE DIRECTORY

TELEPHONE DIRECTORY
COUNCIL DEPARTMENT FAX 826-1422 PUBLIC WORKS FAX 826-1435 VERNON PUBLIC UTILITIES FAX 826-1408 Ybarra, Melissa Mayor 260 Wall, Daniel Director of Public Works- City Engineer 305 Administration Rivera, Jesus Mayor Pro Tempore 260 Barajas, Yesenia Sr. Administrative Assistant 281 Dusenberry, Todd General Manager of VPU 579 Larios, Crystal Councilmember 260 Contreras, Hannia Administrative Assistant 818 Otto, Margie Assistant General Manager of VPU 211 Merlo, Judith Councilmember 260 Cano, Cynthia Administrative Secretary 244 Corbi, Richard Utilities Services Finance Manager 390 Rodriguez, Monica Councilmember 260 Canales, Sergio Assistant Planner 219 Umeda, Lisa Utilities Compliance Administrator 561 CITY ADMINISTRATION Cruz, Wesley Sr. Mechanical and Plumbing Inspector 217 Ramos, Adriana Principal Management Analyst 283 Saeki, Brian City Administrator 228 Melendez, Lissette Project Engineer 246 Sapak, Michelle Administrative Secretary 812 Hernandez, Lilia Deputy City Administrator 266 Vega, Leslie Permit Technician 147 Castillo, Irene Senior Account Clerk 214 Figueroa, Diana Communications & Public Information Manager 570 Cuevas, Elizabeth Permit Technician 284 Renteria, Efren Peregrina Procurement Specialist 355 Sandoval, Sara Management Analyst 224 Zepeda, Eli Street Supervisor 391 Lau, John Management Analyst 573 INFORMATION TECHNOLOGY Velazquez, Carlos Engineering Aide 526 Gonzalez, Sylvie Sr. Power Resource Settlement Analyst 227 Smith, Ernesto Information Technology Manager 369 Rivas, Angel Code Enforcement Officer 362 Palafox, Veronica Power Resource Settlement Analyst 275 Shehata, Mike Information Technology Project Manager 241 Clarke, Tony Code Enforcement Officer 527 Resource Management Ly, Alex Sr. Information Technology Analyst 241 Lozada, Rosemary Management Analyst 398 Raufdeen, Ramzi Integrated Resources Manager 549 De Alba, Dominick Information Technology Technician 241 Gonzalez, Dulce Management Analyst 864 Danialian, Aziz Resource Planner 238 Flores, Paul Information Technology Analyst 241 Garage Fax - 826-1432 380/381/382 Sharifzadeh, Shawn Principal Resource Scheduler/Trader 555 Online Phone Directory Sewer/Streets Fax - 826-1437 526/391 Sandoval, Efrain Principal Resource Scheduler/Trader 311 Helpdesk Requests 241 Front Desk Security Second Floor 300 Engineering CITY ATTORNEY FAX 826-1452 Front Desk Security First Floor 537 Bass, Timothy Utilities Engineering Manager 851 Moussa-Milward, Zaynah City Attorney 839 FIRE DEPARTMENT Direct Line: 583-4821 Fax 826-1407 Nguyen,Viet Electrical Engineer 397 Muro, Eva Legal Analyst 273 Fire Admin 4305 S Santa Fe Ave 280 Electrical Engineer 226 Moore, Marie Management Intern Fire Station 13 3375 Fruitland Avenue 510 Farajzadeh, Maryam Associate Electrical Engineer 548 CITY CLERK FAX 826-1438 Fire Station 52 4301 Santa Fe Avenue 520 Torbati, Iman Yossi Associate Electrical Engineer 167 Rocha, Genoveva City Clerk 897 POLICE DEPARTMENT DISPATCH CENTER 587-5171 Martinez, Hugo CAD Technician 442 Parker, Yonnie Deputy City Clerk 203 Sousa, Robert Chief of Police 114 Customer Service Dolson, Sandra Deputy City Clerk 339 Gray, Brandon Captain 115 Serrano, Anthony Business & Account Supervisor 202 Vault 335 Perez, Nicholas Captain 116 Sun, Jonathan Customer Relations & Marketing Manager 643 HUMAN RESOURCES FAX 826-1439 Johnson, Stephanie Administrative Secretary 118 Rivera, Christina Utilities Customer Service Supervisor 269 Tan, Su Director of Human Resources 239 Gonzalez, Brittany Detective - Professional Standards/Training 123 Moreno, Hilda Utilities Customer Service Rep, Sr 297 Grizzelle, Lisette Human Resources Manager 166 Aggers, Donna J Records Manager 110 Perez, Kristall Customer Service Rep 837 Avendano, Veronica Human Resources Analyst 323 Garcia, Gregory Lead Police Records Technician 158 Generation & Operations Wirtz, Lisa Human Resources Analyst 325 Herrera, Gus Lieutenant - Services Division 126 Dacey, Jared Utilities Operations Manager 582 Garcia, Denise Human Resources Analyst 889 Martinez, Gabriel Lieutenant - Patrol Division 143 Richards, Matt Utilities Operations Manager 378 Alvarado, Leslie Human Resources Technician 312 Huynh, Ailin Police Records Technician 111 Operations Manager 307 Garcia, Alejandro Management Intern Delgadillo, Jason Police Records Technician 112 Wheaton, Gary Maintenance Manager 255 FINANCE / TREASURER Direct Line: FAX 826-1433 / 826-1491 DISPATCH FAX - 826-1486 351/352 Plant Engineer 263 Hui, Alice Director of Finance- City Treasurer 478 Detectives FAX - 826-1483 130-135 Flynn, Mark Site Safety Administrator/CRO 384 Olea, Maria-Luisa Assistant Finance Director 608 Administration FAX - 826-1481 Estrada, Jorrie Electrical Test Technician Lead 578/396 Leon, Joaquin Deputy City Treasurer 365 Records FAX - 826-1482 Power Plant 4963 Soto Street - Direct Line 585-5192 826-1461 Melgar, Angela Finance Manager 242 HEALTH DEPARTMENT Direct Line: 826-1448 Control Center 4963 Soto Street - FAX 585-3119 396/574/575 Magana, Kathryne Accountant 589 Petrosyan, Veronica Director of Health and Environmental Control 256 Gas Ulloa, Jacquelyn Finance Specialist 315 Bista, Pabina Environmental Health Haz-Mat Program Manager 879 Arellano, Claudia Utilities Program Analyst 157/258 Cardenas, Araceli Finance Specialist 896 Ellis, Carmen Environmental Health Haz-Mat Specialist 267 Lozano, Frank Gas Systems Specialist, Lead 833 McCraw, Jason Finance Specialist 379 Do, Tho Environmental Health Haz-Mat Specialist 140 Hernandez, Henry Gas Systems Specialist 813 Luna, Claudia Assistant Buyer 200 Zamora, Ruben Environmental Health Haz-Mat Specialist 838 Water Martinez, Marisela Buyer 235 Lopez, Carla Administrative Assistant 272 Interim Water Superintendent 893 Raquel Franco Payroll Analyst 330 Gastelum, Yannet Environmental Health Technician 878 Moreno, Joanna Hurtado Civil Engineer – Public Utilities 888 Valdez, Javier Risk Manager 825 Garcia, Frank Environmental Health Technician 863 Aho, Rhonda Assistant Civil Engineer 890 394
Petrelli Electric
Plueger, Chris Petrelli Electric 5682
http://tel
[email protected]
Palencia, Charles
Bonfiglio, Michael
Marki, Adriano
DeFrank, Michael
Aldrete, Gabriel                                Lead Maintenance Worker City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXF

LOS ANGELES COUNTY FIRE DEPARTMENT

HAZARDOUS MATERIALS INCIDENT PROCEDURES

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXG

SANITARY SEWER OVERFLOW RESPONSE PLAN
City of Vernon
Sanitary Sewer Overflow Response Plan
August 2026

Page 1 of 5 ends

SECTION 1: PURPOSE
The purpose of the Sanitary Sewer Overflow Response Plan is to minimize the impact of sanitary sewer overflows (SSO's) to the public and the environment. All sanitary sewer overflows will be responded to in a timely manner to expedite the necessary steps to relieve the overflow. Relieving the sewage blockage and spill containment will be the highest priority of the City of Vernon (City), taking into consideration public health and safety concerns. This response plan is a guideline for the standard operating procedures in the event of a sanitary sewer overflow. The response plan will be reviewed periodically to ensure that all corrective measures are being taken.

As the primary first responders, the Department of Public Works will respond to a potential sanitary sewer overflow (SSO) site and will enlist the assistance of the Department of Health & Environment Control. Should the SSO involve hazardous material, the Fire Department will implement the necessary Standard Operating Procedure for the handling of hazardous materials.

If there is no hazardous material involved, the Public Works crew will proceed with containment, clean-up, and restoration.

SECTION 2: SPILL RESPONSE
Once notification is received, the City's Public Works crew will respond to the spill site with the proper spill response and safety equipment. After normal business hours, the City's Public Works stand-by crew will respond. The Street Supervisor, or senior crew member, will assess the problem and assign the crew job duties to eliminate the overflow if originating from a City-owned facility. If the overflow originates from private infrastructure, the Street Supervisor or senior crew member will instruct the appropriate private wastewater generator to eliminate the overflow. The Street Supervisor or senior crew member will notify the Public Works Director as soon as reasonably possible, but not to exceed 48 hours whether the problem occurs during, or after, normal business hours.

SECTION 3: CONTAINMENT
Containment is a top priority for the City. The Public Works crew will make any reasonable effort to keep the SSO as small of an area as possible. It is preferred that the crew keeps the SSO out of storm drains. To make sure the SSO is contained, the Public Works crew will use the following methods:
o Use sandbags, soil or other containment devices/material to keep the overflow from reaching a storm drain.
o Should the overflow take place in an area not normally accessible to the public, the Public Works crew will use any reasonable means to contain the flow in that area for recovery. o Should the flow be too much to be contained on the street, the Public Works crew will attempt to contain the spill in the storm drain and recover it from that point. o Contracted Agency – Depending on SSO
City of Vernon
Sanitary Sewer Overflow Response Plan
August 2026

Page 2 of 5 ends

SECTION 4: EMERGENCY TRAFFIC CONTROL
If the spill occurs in a roadway, traffic should be prevented from driving through the spill. The City's Public Works crew will use delineators, cones and even City vehicles to create a safe traffic diversion around the spill area. Pedestrians will be diverted to a safe area. Care will be taken not to direct pedestrians into traffic lanes.

In the event that the spill is located in a high traffic area, the Public Works crew will seek assistance from the City's Police Department (Non-Emergency) at (323) 587-5171.

SECTION 5: BLOCKAGE REMOVAL
The Street Supervisor, or senior crew member, will assess the problem and assign the crew job duties in order to remove the blockage from City-owned infrastructure.

SECTION 6: BYPASS
If the blockage is not relieved within the first few attempts and is projected to exceed the capacity of the temporary flow containment area, it is crucial that bypass procedures are followed immediately. The Street Supervisor, or senior crew member, will locate the nearest downstream manhole that can accept the additional flow, and set up an appropriately sized pump. The pump discharge hose should be secured or placed far enough into the receiving manhole that it will not come out during pumping. The pump and pump hose should be protected from traffic by barricades.

SECTION 7: REPORTING AND NOTIFICATION
For any discharges of sewage that result in a discharge to a drainage channel or a surface water, the City, as soon as possible but not later than two (2) hours after becoming aware of the discharge, notify the Vernon Department of Health & Environmental Control, State Office of Emergency Services (for discharges of 1,000 gallons or more of sewage), Los Angeles County Health Department (for discharges that enter L.A. River), Long Beach City Health Department (for significant spills into L.A. River that may affect City of Long Beach) and the Los Angeles Regional Water Quality Control Board. Notification to the Los Angeles Regional Water Quality Control Board should be followed-up with a fax or email, and should also specify that the State Office of Emergency Services, Los Angeles County Health Department and Long Beach Health Department have already been notified.

OFFICE OF EMERGENCY SERVICES
(800) 852-7550
(916) 262-1677 FAX
City of Vernon
Sanitary Sewer Overflow Response Plan
August 2026

Page 3 of 5 ends

LOS ANGELES COUNTY

HEALTH DEPARTMENT
(213) 974-1234 or
(562) 861-0316

LONG BEACH CITY

HEALTH DEPARTMENT
(562) 254-9730 or
(562) 570-4129

CALIFORNIA REGIONAL WATER QUALITY CONTROL
BOARD

LOS ANGELES REGION
(213) 576-6600
(213) 576-6640 FAX
In the event that any sewage is discharged into a Los Angeles County Storm Drain, the Department of Health & Environmental Control shall also notify Los Angeles County Public Works as soon as possible but not later than two (2) hours after becoming aware of the discharge. For any sewage discharges that are identified by the Public Works crew as originating from the Los Angeles County Sanitation District sewage line, the Department of Health & Environmental Control shall notify the Los Angeles County Sanitation District.

LOS ANGELES COUNTY

PUBLIC WORKS
(626) 458-4357 or
(562) 861-0316

LOS ANGELES COUNTY SANITATION DISTRICT
(562) 699-7422
The Public Works Director is the authorized representative for the City, as described in Section J of SWRCB Order No. 2006-2003. Accordingly, he will oversee the SWRCB On-Line Reporting.

Initial reporting of all Category 1 SSO's originating from City-owned infrastructure (greater than 1,000 gallons, discharge to a drainage channel or surface water, and /or discharge to a storm drain which was not fully captured) must be reported to the Online SSO System as soon as possible but no later than 3 business days after the City is made aware of the SSO. A final certified report must be completed through the Online SSO System, within 15 calendar days of the conclusion of SSO response and remediation. Initial reporting of Category 2 SSO's (all other SSO's originating from City-owned infrastructure) must be reported to the Online SSO System within 30 days after the end of the calendar month in which the SSO occurred. Minimum information that must be contained in either the 3-day, 15-day or 30-day report must include all information identified in Section D (ix), Monitoring and Reporting Program, of SWRCB Order No. 2006-0003.

City of Vernon
Sanitary Sewer Overflow Response Plan
August 2026

Page 4 of 5 ends

SECTION 8: POSTING
Proper signs will be posted to warn the public of potential contamination hazards:
o Posting of caution tape, cones and/or signs will be done in all cases where there is standing liquid or the ground is saturated.
o Restrictions will be placed in locations with high visibility so they can be seen from all routes that the public might take to enter an area.
o Restrictions will remain posted for a period determined by the Public Works Street Supervisor, in consultation with the Department of Health & Environmental Control.

SECTION 9: RESTORATION
The Public Works crew will use the following procedures to restore the site:
o Collect and dispose of any standing or pooled sewage. o Recover any sewage within storm drains, channels, curb, gutters, and culverts. o Clear surrounding area of paper, solids, and any other signs of a SSO. o Apply diluted household bleach to sanitize the affected area, use water from the nearest fire hydrant to wash down the area, dechlorinate if needed, and recover as much of the wash down water as possible.
o The restoration effort will not be considered complete until affirmed by the Department of Health & Environmental Control.

SECTION 10: DOCUMENTATION
The City's documentation shall contain the following information:
o Beginning and ending times.
o Exact location of the SSO.
o Any and all conditions that may have contributed to the cause of the SSO. o Whether the SSO reached surface waters or a storm drain. o Total gallons spilled and the amount recovered (use attached flow estimation chart if necessary).
o Damage that was caused, and any repairs that were made.

City of Vernon
Sanitary Sewer Overflow Response Plan
August 2026

Page 5 of 5 ends

o Photographs of the affected area (if appropriate).
o All notifications.

SECTION 11: TRAINING
Relevant personnel shall review this procedure during internal training sessions and/or a field practicum no less than semi-annually.

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXH

CITY OF VERNON STANDARD DRAWINGS

DV 1888 CURB DRAINS

REVISIONS
DV 2171 PARKWAY DRAIN NO. 1

REVISIONS

STANDARD TREE

PLANTING

REVISIONS
MV 1891

STANDARD TREE

PLANTING

REVISIONS
MV 1891

STANDARD TREE

PLANTING

REVISIONS
MV 1891

STANDARD TREE

PLANTING

REVISIONS
MV 1891

PV 693 STANDARD DRIVEWAY

REVISIONS

V2264

TYPICAL TRENCH

PAVING SECTION

REVISIONS
V2264

TYPICAL TRENCH PAVING SECTION

FOR SEWER LATERAL

REVISIONS
V2122 STANDARD MASONRY WALL BARRIER REVISIONS
City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIX I

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC

WORKS STANDARD DRAWINGS

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026
APPENDIX]

SEWER AND STORM DRAIN PROGRAMMED

MAINTENANCE SYSTEM

CITY OF VERNON

DEPARTMENT OF PUBLIC WORKS

SEWER AND STORM DRAIN

PROGRAMMED MAINTENANCE SYSTEM
The objective of this Programmed Maintenance System is to ensure that the sewer and storm drain systems in the City of Vernon perform as designed without service interruptions due to lack of maintenance. The City's sewer and storm drain systems receive a wide variety of discharges and with nearly 1000 manholes in the sewer system alone, it is impractical to attempt to maintain the system without a programmed maintenance approach. When fully implemented, this Programmed Maintenance System will keep the sewer and storm drain systems operating properly and provide important data, to be used to identify trouble spots before they cause problems.

Since most of the work related to this Programmed Maintenance System will take place in the street, it is important that traffic safety be put first. Always use proper delineation when occupying a traffic lane. If, at any time, it is necessary to divert traffic into opposing traffic lanes, a flagman or flagmen MUST be used. If adequate personnel are not available immediately, wait until the job can be performed safely before blocking traffic. Whenever possible, try to schedule the appropriate crews ahead of time to avoid unnecessary delays. Failure to follow standard traffic safety procedures when working in the street can have serious consequences for City personnel, the City itself, and the public.

SEWER SYSTEM

1. Inspection
All aspects of the sewer system shall be inspected as a part of this Programmed Maintenance System. The first and most visible part of the sewer system is the manhole frame and cover. The condition of each frame and cover should be checked for damage, fit, and wear. The frame and cover should also be flush with the street level and any sags should be recorded. Also, a record should be made of any signs of asphalt deterioration around the manhole that could result in rainwater infiltration.

Next, the condition of the manhole structure should be checked. Remember to use confined space entry techniques whenever opening and/or entering a manhole.

The walls of the manhole should be structurally sound and free from debris. Brick manholes should' be checked for loose or missing bricks and deteriorating grout.

Concrete manholes should be checked for the condition of the concrete coating as well as evidence of concrete deterioration. The condition of the shelf (or bench) including structural deterioration as well as the presence of debris on the shelf should be recorded. If the manhole has any other lines entering the structure, such as in the case of junction or drop manholes, the location of these lines should be recorded.

Finally, the amount of cockroaches present in the manhole should be recorded.

After evaluating the physical attributes of the manhole structure, attention should be diverted to the actual flow of wastewater. An estimation of the flow rate (half full, quarter full, etc.) should be made as accurately as possible. The nature of the flow (color, unusual odor, large amounts of grease or debris, etc.) should also be recorded.

These observations should be made as carefully as possible but they will be used for general information only. Specific data on flow rates and wastewater quality will be obtained through separate programs.

2. Cleaning
If debris or grease is present on the walls and/or shelf of a manhole, the debris should be cleaned off using a high pressure water sprayer. Care should be taken not to damage the structure during the cleaning process. Main line cleaning should be accomplished with the Jetter truck. While jetting, the operator must pay close attention to the water jetting back through the manhole to see if any solid matter is being drawn back into the manhole. If material is being drawn back, the operator should try to identify the material. If large amounts of grease are dislodged, another crew should be stationed at the next downstream manhole to chop up any big chunks to prevent clogging the line further downstream. In all cases, if unusual amounts of grease or debris are encountered, a supervisor should be contacted to determine the best course of action.

3. Insect Control
Insects, mainly cockroaches, can thrive in the sewer environment. These unwanted guests can spread disease from contact with waste water and also physically damage a sewer system. For these reasons, the populations of insects within the sewer system must be controlled by the use of insecticides. Insect control spraying should only occur during the weather that will produce the best result. For the currently used insecticide, the month of June has been identified as the optimum time of year to apply the product. The insecticide shall be applied in accordance with the manufacturer's recommendations. Use all required safety gear and traffic control techniques when applying the product.

4. Record Keeping
Record keeping is a vital part of any Programmed Maintenance System. The data collected will be entered into a computer where it can be easily analyzed and sorted.

The sewer inspection data shall be recorded on the attached Sewer Inspection Record sheet. The use of this standardized form will speed the collection of data in the field as well as set the format for data entry into the computer. These forms shall be turned in for computer entry at the end of each week. It is important that the data collected on this form be as accurate as possible. The City's sewer maintenance database is only as useful as it's data is accurate.

When completing the Sewer Inspection Record sheet, pay close attention to all entries. If a particular entry item does not apply to the manhole in question, mark the space “N/A”. There are several places where the relative condition of a specific element of the sewer system is to be estimated. Values ranging from Good to Very Poor should be judged with respect to the element in question. For instance, in order to receive a Good rating, the frame and cover of a manhole should fit well, be undamaged, and have good asphalt all around. A Very Poor rating would indicate that the frame and cover are severely damaged and are in need of immediate replacement. Values in between Good and Very Poor should be assigned depending on the severity of the damage. A brief description of the damage, if any, should be made in the comments area at the bottom of the form.

When assessing the condition of manhole walls, assign Good ratings to manholes that have no apparent defects. Peeling coatings and loose bricks are common defects in manhole walls and the severity of the defects should be reflected with either a Fair or Poor rating. The Very Poor rating should only be assigned to a manhole that is in immediate need of repair. Again, a brief description of the defects should be made in the comments section at the bottom of the form. Evidence of a sewer surcharge or backup will be a coating of waste water residue on the manhole walls with a "ring" at the high water mark. If such evidence is present, record the approximate high water height above the shelf in the comments section at the bottom of the form.

The condition of the invert and shelf is somewhat more difficult to quantify. Some defects may not be visible through the waste water. If the flow through the invert is smooth and no debris is visible on the shelf, the invert and shelf should be given a Good rating. Disrupted flows due to debris or structural damage and the presence of debris on the shelf will give either a Fair or Poor rating depending on the severity of the damage. A Very Poor rating should be assigned if there is a substantial disruption of the flow that cannot be repaired with normal cleaning. A Very Poor rating should also be given if the invert shows structural damage that allows waste water to leak out of the sewer system.

Again, briefly describe the nature of the defect in the comments section at the bottom of the form. On the reverse side of the Sewer Inspection Record are several diagrams showing sewer invert types. Determine which of the diagrams matches the invert in the manhole and enter the letter below the diagram in the corresponding space on the form.

If the invert type does not exactly match a diagram but is only slightly different, record the letter of the closest match. If there is absolutely no match, enter an X and draw a simple sketch in the blank diagram. If there are additional laterals or mains entering the manhole, note the size of each in the comments section of the Inspection Record. Also record the distance from invert to invert of any drop laterals or connections in the manhole.

STORM DRAIN SYSTEM

1. Inspection
Storm drain catch basins are the principal focus of the storm drain section of this Programmed Maintenance System. As the primary entrances to the storm drain system, catch basins play a vital role in the control of storm water. Catch basins are built into the street, usually in the sidewalk with an opening in the curb face. Since they are located close to traffic areas, catch basins are subject to damage from vehicles. With this fact in mind, damage to the structure caused by vehicular traffic should be checked for first.

Look for signs of damage such as cracked or broken concrete on the sidewalk or at the curb face entrance.

Another aspect of catch basin maintenance has nothing at all to do with the collection of storm water. Catch basins may collect storm water, but they also double as sidewalks, and as such must be safe to walk on. Any cracks, displacements, or tripping hazards must be noted and scheduled for repair. The access manhole cover should be flush with the surrounding concrete and fit well. When evaluating a small crack, remember that a nasty fall can come from a displacement as small as 1/4 inch high! While inspecting the exterior of the catch basin, look in the gutter for any signs of staining or water draining into the catch basin while it is not raining. Any nonrainwater discharges should be recorded and the source identified. As a general rule, only rain-water is allowed to enter the storm drain. If any other liquids are entering a catch basin, appropriate actions should be taken as soon as possible.

After the exterior of the catch basin has been inspected, the interior inspection should begin. As always, use confined space entry techniques whenever opening and/or entering a catch basin. The first thing to look for is debris. While all catch basins collect a certain amount of trash, some collect unusually large amounts. The relative amount of debris should be recorded. After the debris has been removed using the cleaning techniques to follow, the general condition of the structure should be assessed. Any cracks in or degradation of the concrete interior of the catch basin should be noted. Also check for any inlet connections other than the curb face inlet. lf any other inlets are found, the address of the property to which the inlet is connected should be recorded.

In addition to inspecting each catch basin, the manholes into the main storm drain lines must be checked. The physical aspects (such as manhole frame and cover, walls, invert, etc.) should be checked in much the same manner as the sewer manholes.

The pipe, however, should be dry unless it is raining or has recently rained. While it is true that there are some legal storm drain discharges, any storm drain that runs in dry weather must be investigated. The responsibility of sewer and storm drain personnel is to try to identify the source and notify a supervisor for appropriate action. Important information to report includes the date and time that the flow was observed, the location where the flow enters the storm drain, and the nature of the discharge. If the flow is clearly coming from an above ground source, note the address of the discharger.

Otherwise, try to isolate the location of the source to between two manholes. In any event, this information must be relayed to a supervisor in a timely manner so appropriate action can be taken. Again, it is the responsibility of the sewer and storm drain inspection personnel only to report suspicious discharges to a supervisor. Any and all enforcement of storm water laws shall be left to the appropriate agencies.

2. Cleaning
Improper cleaning of catch basins can lead to serious problems during wet weather. For this reason, particular care must be taken to ensure that the system will flow freely when called upon to do so. As always, use confined space entry techniques whenever entering a catch basin. The first step in the cleaning process is to make sure that there is no hazardous materials in the catch basin. Use a rake or similar tool to move the debris around to ensure that there is no hazardous materials present. If hazardous materials are encountered, they should be left alone until a representative of the Fire Department can be summoned to the scene to determine how to handle the hazardous material. Don't take any chances with hazardous materials. Once the catch basin is free of hazardous materials, the debris should be removed using the vacuum truck.

Once the catch basin has been cleaned thoroughly and has been proven safe for entry using confined space entry techniques, the lateral must be visually checked for obstructions. Physically climbing into the catch basin and looking down the lateral using a flashlight or mirrors for light is the only way to positively verify that the lateral is clear. If the lateral is clogged, or if the lateral turns so it is impossible to see all the way to the main line, the lateral must be cleaned by using the jetter or whatever means necessary to clear the line. If it is necessary to clean the lateral, a second visual check shall be performed to ensure that the obstruction has been removed. It is very important that every catch basin lateral be free from obstructions.

If debris is encountered in a storm drain main line, it must be removed. If large amounts of dirt, sand, or other sediment is found on a storm drain main line, an effort must be made to identify the source. Vacant lots and construction projects can produce a very muddy runoff that can silt up in the main. Dirt, sand, and other debris can also be a sign of a damaged or broken line. In any case, sediment in the line should be reported to the supervisor so that appropriate action can be taken. It may be necessary to pre-form an internal inspection of the pipe.

3. Record Keeping
The data gathered during the storm drain inspection and cleaning shall be recorded on the attached storm drain inspection record. These standardized forms should be completed in much the same way as the sewer inspection records. It is crucial to the success of this program that the data entered onto the forms be accurate. Data based on assumptions is frequently inaccurate. If there is any question on any data, do not guess. It is better to leave the form blank than to record inaccurate data.

The storm drain inspection records have been separated into two parts; one for the catch basins and one for the main line manholes. The same sort of estimates of the condition of manholes made during the sewer inspection will be made again with the storm drain system. A Good rating means that there is no apparent damage. A Fair rating means that there is minor damage that does not need repair. A Poor rating means that the damage is severe enough to need repair, but the repairs do not necessarily need to happen right away. A Very Poor rating shall be reserved for damage that needs to be repaired right away.

Summary
This Programmed Maintenance System will provide a guideline for the inspection and maintenance of the City's sewer and storm drain systems. This Programmed Maintenance System will also allow us to better understand the dynamic nature of the sewer and storm drain systems. ln the long run, this Programmed Maintenance System will provide a better maint8ined sewer and storm drain and will reduce wasted efforts by identifying small problems before they become large one

INVERT TYPES
NOTE: Select the invert type that most closely matches the actual invert and enter the letter below the diagram in the space provide on the other side of this form. /
X

SEW'ER INSPECTION RECORD
Name Date Section
Manhole#
Size of main Location
Type of Pipe
circle one
VCP Brick
other
Gas Monitor Readings
O2 H2S
LEL_____
Type of frame and Cover
Circle one
Locking Non locking
Bolted Other
Condition of Frame
and Cover
Circle one
Good Fair
Poor Very Poor
Type of Manhole,Wall
circle one
Brick Concrete
If Wall is Concrete
Coated Uncoated
Condition of Coating' circle one (if applicable)
Good Fair
Poor Very Poor
Condition of Walls
circle one
Good Fair
Poor Very Poor
Flow Rate
circle one
< 1/4 Full 1/4 -1/2 Full
1/2- 3/4 Full > 3/4 Full
Is Debris
Visible?
circle one
Yes No
ls Grease
Visible?
circle,one
Yes No
Is there evidence Condition or invert
of a surcharge? and Shelf
circle one circle one
Invert Type Depth to
Invert
Number of Roaches
circle one
None Few
Yes No Manv Infested
Good Fair
F'oor Verv Poor
Comments:

Name Date . Section
Manhole#
Size of main Location
Type of Pipe
circle one
VCP Brick
Other
Gas Monitor Readings
O2 H2S
LEL _____
Type of Frame and Cover
Circle 011e
Locking Non locking
Bolted Other
Condition of Frame
and Cover
Circle one
Good Pair
Poor Very Poor
Type of Manhole Wall
circle one
Brick Concrete
If WaII is Concrete
Coated Uncoated
Condition of Coating
circle one (if applicable)
Good Fair
Poor Very Poor
Condition of Walls
circle one
Good Fair
Poor Very Poor
Flow Rate
circle one
< 1/4 Full 1/4 -1/2 Full
1/2-3/4 Full > 3/4 Full
Is Debris
Visible?
circle.one
Yes No
Is Grease
Visible?
circle one
Yes No
Is there evidence
of a surcharge?
circle one
Yes No
Condition of Invert
and Shelf
circle one,
Good Fair
Poor Very Poor
Invert Type Depth to
Invert
Number of Roaches
circle one
None Few
Many Infested
Comments:

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026
APPENDIX I<.

PUBLIC OUTREACH FOR FOG CONTROL

FOG REGULATIONS
Frequently Asked Questions (FAQs)

General Questions
What is the Fats, Oils, and Grease (FOG) Ordinance and why does it exist?

Chapter 13.25 of the Vernon Municipal Code (VMC) establishes rules governing the discharge of fats, oils, and grease (FOG) into the City's sewer system. FOG discharged by food service establishments is one of the leading causes of sewer line blockages and sanitary sewer overflows (SSOs). The ordinance is designed to protect the sewer infrastructure, prevent spills, and maintain compliance with state and federal water quality laws. To view Chapter 13.25 of the VMC in its entirety, please visit www.cityofvernonca.gov/FOG.

Who must comply?
All food service establishments (FSEs) operating within the City of Vernon must comply. An FSE is broadly defined as any commercial entity operating in a permanent structure where food is stored, prepared, served, manufactured, packaged, or otherwise handled for sale or public consumption.

When did this go into effect?
Ordinance No. 1312 was adopted on April 21, 2026 and became effective May 22, 2026. There is a January 1, 2030 deadline which applies to FOG Discharge Permit requirements and grease interceptor installation for certain existing FSEs.

Permits
Do I need a permit?
Yes. Every FSE that discharges or may discharge FOG into the City's sewer system must obtain a FOG Discharge Permit. You must apply for a permit when you apply for a new or renewed business license. All FSEs must hold a valid permit no later than January 1, 2030. (VMC § 13.25.120)
How do I apply for a permit?
Submit a completed application in the form prescribed by the City, along with the required permit fee. Your application must include your FSE's name, address, owner information, food types and processes, assessor's parcel number, and property owner

FOG REGULATIONS
Frequently Asked Questions (FAQs)

Page 2 of 4 ends

or lessor details. The City may also require site plans, plumbing diagrams, and other documentation. (VMC § 13.25.130)
For how long is a permit valid?
FOG Discharge Permits are issued for a period of up to three years. You must renew your permit before it expires and pay all outstanding fees before renewal will be granted. (VMC § 13.25.170)
Can I transfer my permit to a new owner or location?
No. FOG Discharge Permits are non-transferable. Any permit transferred to a new owner, operator, or facility is automatically void. The new operator must apply for their own permit. (VMC § 13.25.180)
Grease Interceptors
What is a grease interceptor and do I need one?
A grease interceptor is an underground multi-compartment device that separates and retains FOG from wastewater before it enters the sewer system. Unless the City grants a conditional waiver, all FSEs are required to install, operate, and maintain an adequately sized grease interceptor. (VMC § 13.25.090)
When must I install a grease interceptor?
New construction FSEs must install a grease interceptor before commencing any discharge. Existing FSEs connected to sewer hot spots must comply by January 1, 2030. (VMC § 13.25.090)
What if installation is impossible or impractical at my location? You may apply to Vernon’s Director of Public Works (Director) for a conditional waiver allowing an alternative pretreatment technology, provided it is at least as effective as a grease interceptor. You must demonstrate effectiveness through at least three months of downstream visual monitoring at your own expense. Waivers are valid for up to three years and may be revoked if conditions change. If no physical installation is possible at all, the City may charge a Grease Disposal Mitigation Fee. (VMC § 13.25.100)
How often must I clean and maintain my grease interceptor? Grease interceptors must be fully pumped and cleaned often enough that combined FOG and solids never exceed 25% of the total liquid depth. At minimum, maintenance must occur at least every six months. Your actual frequency may be

FOG REGULATIONS
Frequently Asked Questions (FAQs)

Page 3 of 4 ends

higher depending on your operations. Maintenance records must be kept for at least three years. (VMC § 13.25.240)
Day-to-Day Compliance
What is the discharge limit for oil and grease?
No FSE may discharge total dispersed oil and grease exceeding 650 mg/L, and no visible floatable oil and grease may be discharged at any time. (VMC § 13.25.060) What are best management practices (BMPs) and am I required to follow them? BMPs are operational practices that minimize FOG from entering the sewer system. All FSEs are required to implement BMPs, which include: installing drain screens in food prep areas; storing and disposing of waste cooking oil in sealed containers using licensed waste haulers; disposing of all food waste in trash (never sinks); dry-wiping pots and pans before washing; posting BMP guidelines prominently in kitchen and wash areas; and training all employees at least twice per year. (VMC § 13.25.230) Can I use chemical or biological additives to break down grease? No, not without prior written authorization from the Director. Emulsifying additives and biological grease remediation products are prohibited without that written approval. (VMC § 13.25.070)
What do I do if I have an accidental FOG discharge?
Immediately notify the City by telephone using the number in your permit. If the discharge could cause sewer blockages or SSOs, also contact the Health & Environmental Control Department and Public Works Department. Written confirmation of the incident must be submitted to the Director within three business days, describing the cause, immediate corrective actions taken, and steps to prevent recurrence. (VMC § 13.25.280)
Penalties and Enforcement
What happens if I don’t comply?
Non-compliance can result in: criminal misdemeanor charges with fines up to $1,000 and/or imprisonment up to six months per violation per day; civil penalties up to $25,000 per violation per day; permit suspension or revocation; and cost recovery from your business and/or your property owner for any City sewer cleanup, repair,

FOG REGULATIONS
Frequently Asked Questions (FAQs)

Page 4 of 4 ends

and remediation costs, which may be collected as a lien or special assessment on the property. (VMC §§ 13.25.310–13.25.350)
Can I appeal a City decision?
Yes. You may appeal any final written decision of the Director to the City Administrator by filing a written Notice of Appeal with the City Clerk within 15 calendar days of service of the Director's decision. The City Administrator's decision is the City's final administrative action and is subject to judicial review under Code of Civil Procedure Section 1094.5. (VMC § 13.25.340)
FOG Regulations Resources
Who can I contact for assistance?
For FOG permits, applications, and further information, contact the City of Vernon Public Works Department at:

Phone: (323) 826-3623
Email: [email protected]
Address: Vernon City Hall
4305 S Santa Fe Ave.

Vernon, CA 90058
2nd Floor
To notify the City of an accidental discharge that could result in blockage or sanitary sewer overflows, contact the Public Works Department at the number above and the Department of Health and Environmental Control at:

Phone: (323) 826-1448
Email: [email protected]

PUBLIC NOTICE TO ALL FOOD SERVICE ESTABLISHMENTS
Fats, Oils and Grease (FOG) Ordinance — Vernon Municipal Code Chapter 13.25 Dear Vernon Food Service Establishment Operator,
The City of Vernon has adopted Ordinance No. 1312, which is now codified as Chapter 13.25 of the Vernon Municipal Code (VMC). This ordinance establishes comprehensive regulations regarding Fats, Oils, and Grease (FOG) that apply to all food service establishments (FSEs) operating within the city. This notice summarizes your responsibilities. To view Chapter 13.25 of the VMC in its entirety, please visit www.cityofvernonca.gov/FOG.

PURPOSE OF THE ORDINANCE
This ordinance aims to prevent blockages in the City's sewer infrastructure caused by the discharge of fats, oils, and grease (FOG). It seeks to reduce the risk of sanitary sewer overflows (SSOs) and ensure compliance with state and federal water quality standards. This ordinance is established in accordance with State Water Board Water Quality Order No. 2022-0103-DWQ and California Government Code Section 54739.

YOUR KEY OBLIGATIONS

1. FOG Discharge Permit:

All FSEs must obtain a FOG Discharge Permit from the City. A permit must be obtained when applying for a new or renewed business license, and all FSEs must hold a valid permit by January 1, 2030. (VMC § 13.25.120)

2. Grease Interceptor Installation:

Unless a conditional waiver is granted, all FSEs must install, operate, and maintain an adequately sized grease interceptor prior to discharging wastewater. New construction FSEs must install a grease interceptor before commencing any discharge. Existing FSEs connected to sewer hot spots must comply by January 1, 2030. (VMC § 13.25.090)

3. Discharge Limits:

No FSE may discharge total dispersed oil and grease exceeding 650 mg/L, nor any visible floatable oil and grease. (VMC § 13.25.060)
PAGE 2 OF 2

4. Best Management Practices (BMPs):

All FSEs must implement BMPs, including dry-wiping equipment before washing, proper disposal of food waste and cooking oils, installation of drain screens, and posting of BMP guidelines in food preparation areas. (VMC § 13.25.230)

5. Employee Training:

FSE employees must receive initial FOG BMP training by May 22, 2027 and twice each calendar year thereafter. Training records must be retained and made available to City inspectors upon request. (VMC § 13.25.230)

6. Record Keeping:

Manifests, receipts, and invoices for all grease control device maintenance, waste hauling, and disposal must be retained for a minimum of three years. (VMC § 13.25.250)

CONSEQUENCES OF NON-COMPLIANCE
Violations of Chapter 13.25 may result in criminal penalties of up to $1,000 per violation per day and/or imprisonment up to six months; civil penalties of up to $25,000 per violation per day; permit suspension or revocation; and cost recovery from the FSE and/or property owner for sewer cleanup, repair, and remediation, including potential liens or special assessments on the property. Please act promptly to ensure compliance.

CITY CONTACTS
If you have questions, you may contact us as follows:

City of Vernon Public Works Department
[email protected]
(323) 826-3623
City of Vernon Health & Environmental Control Department [email protected]
(323) 826-1448
Thank you for your attention to this important matter. We appreciate your cooperation.

Sincerely,
City of Vernon Team

IMPORTANT
NOTICE
Your Action Items:
▶ Apply for a FOG Discharge Permit — required at business license renewal and by January 1, 2030
▶ Install a grease interceptor — or apply for a conditional waiver if installation is not feasible
▶ Train employees — FOG best management practice training must be conducted twice a year, and records must be maintained for 3 years ▶ Never pour cooking oil down drains — store in sealed containers and use a licensed waste hauler
▶ Keep records — maintain grease interceptor maintenance logs and waste hauling manifests for at least 3 years
KEY DEADLINE: JANUARY 1, 2030
All food service establishments must obtain and maintain a valid FOG Discharge Permit and have a grease interceptor in place by this date.

Non-compliance may result in fines up
to $1,000 per day (criminal) or $25,000
per day (civil), permit revocation,
and cost recovery from your business
and/or property owner for any sewer
damage caused.

NEW FOG REGULATIONS NOW IN EFFECT
The City of Vernon has adopted new Fats, Oils, and Grease (FOG) regulations that apply to your business. These regulations are now in effect under Vernon Municipal Code Chapter 13.25 (Ordinance No. 1312). For details, visit www.cityofvernonca.gov/FOG.

If you have any questions or need assistance with the permit application process, please contact the City of Vernon Public Works Department at [email protected] or (323) 826-3623.

All food service establishments (FSEs) operating within the City of Vernon, including restaurants, cafeterias, food manufacturers, and commercial kitchens must comply

LEGAL AUTHORITY
Vernon Municipal
Code Chapter

13.25, Ordinance
No. 1312, which
became effective
on May 22, 2026

KEY DEADLINE
All food service
establishments
must hold a valid
FOG Discharge
Permit by
January 1, 2030

PENALTIES
Criminal and Civil penalties
for non-compliance
including fines,
imprisonment, permit
suspension or revocation,
and cost recovery for sewer
cleanup and repairs
FOG REQUIREMENTS:

We’re here to help! If you have any
questions or need assistance with
the permit application process,
please contact the City of Vernon
Public Works Department at:

QUESTIONS?

FATS, OILS, AND GREASE
(FOG) PROGRAM OVERVIEW
[email protected]
or (323) 826–3623.
• Obtain a FOG Discharge Permit
• Install and maintain a grease interceptor
• Discharge no more than 650 mg/L of total
oil and grease
• Train employees twice per year on FOG
best management practices
• Properly dispose of waste cooking oil —
never down the drain
• Keep maintenance and training records
for 3 years
Visit www.cityofvernonca.gov/FOG
for details.

City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXL

SANITARY SEWER SYSTEM HOTSPOT

MAPS AND LIST
Sec. 2 CITY OF VERNON maintenance zones Sec. 1Sec. 3b Sec. 3A Sec. 5 LEGEND: SECTION 1 SECTION 2 SECTION 3A SECTION 3B SECTION 4 SECTION 5 Sec. 4 Miguel Bribiesca (323) 974-1480 Martin Gutierrez (323) 514-4229 Martin Vazquez (213) 259-4858 Martin Vazquez (213) 259-4858 Gustavo De Loza (323)430-3955 Carlos Espinoza (323) 974-2387 04/21/2026 Graffiti Crew : Jose Zermano (323) 595-0056 Graffiti Crew : Adrain Loya (323) 974-2383 Sign Crew : Jerry Alvarado (323) 383-8684 CODE ENFORCEMENT : SECTION 1-2-3A ANGEL RIVAS (213) 348-4135 CODE ENFORCEMENT : SECTION 3B-4-5 TONY CLARKe (213) 255-9816 SCALE IN FEET 0 600 DATE DESCRIPTION INITIALS REVISIONS 25TH STREET 27TH STREET 28TH STREET 30TH STREET ROSS ST. 26TH STREET 37TH STREET 38TH STREET VERNON AVENUE 45TH ST. 46TH ST. 48TH STREET 49TH STREET 51ST STREET 52ND STREET 55TH STREET ANDERSON AVE 44TH STREET 46TH STREET LEONIS BOULEVARD 50TH STREET FRUITLAND

SOTO STREET

BOYLE AVE

ALCOA AVE

SEVILLE AVENUE

SANTA FE AVENUE

ALAMEDA STREET
DOWNEY RD.

HAMPTON STREET
1ST ST.
2ND ST.

IRVING ST.

ROSS STREET SLAUSON AVE
MALBURG WAY 52ND STREET

HAWTHORNE
ST. CHARLES

SIERRA PINE AVE

INDIANA AVE
BONNIE BEACH PL.

AYERS

SUNOL DRIVE

BANDINI BOULEVARD

AYERS AVENUE
26TH STREET

WASHINGTON BOULEVARD

ATLANTIC BOULEVARD

MAYWOOD

MAYWOOD AVENUE

EVERETT AVENUE

EVERETT COURT

CHARTER

EXCHANGE AVENUE
49TH STREET 50TH STREET

FRUITLAND AVENUE
CORONA AVE.

GIFFORD AVE.

EVERETT AVE.

LOMA VISTA AVE. CHAMBERS45TH STREET

SEVILLE AVENUE

MINERVA

HARRIETT

BANDINI BOULEVARD

FRUITLAND AVE

BOYLE AVENUE
DOWNEY RD.

AVENUE 27TH

MALBURG WAY
54TH STREET
BICKETT ST. 37TH STREET PACIFIC BOULEVARD
49TH ST.

DISTRICT BOULEVARD

BOULEVARD

DISTRICT
ST.

AVENUE

BOULEVARD
26TH STREET

WASHINGTON

SOTO STREET
VERNON AVENUE 53RD STREET 54TH STREET 55TH STREET 56TH STREET 57TH STREET 58TH STREET 44TH ST. PACKERS AVE. 45TH ST.

SACO ST.

MALABAR
DEKALB 49TH STREET
JEWEL AVENUE LEGEND S174 S340
S1928 S1597
S2105 C.M.D.

HELIOTROPE
52nd CITY OF VERNON MANHOLE OTHER COUNTY SANITATION DISTRICT LINES 8" 30" 8" P V
T SLAUSON AVE 15" COUNTY MANHOLE

MAYFLOWER
KING
SLAUSON AVE.
52nd

ALAMO STREET STREET AVENUE

L O N G

B E A C H
F R W Y . - 7 1 0 57TH
S138
S166
S2112
8"
8"
8"
S136B 10" 10" S136B 10" 12" 8" 10" 12"
S1603
8"
S142 8" 8"S411 S1983
S2396 8"
S862 8" 8" S178 15" 8"
S1829
8" 8" S170 FURLONG PVT 8" S141 8" S1779
S141 8" S17798" S175 8" 8" S1954 8" S174 8" S154 8" S156 8" S155 8" S158 8" S1578" S160 18" S161 20" 18" S1858 8"
8" S2027 S161 18"
S1593 8" 10" S1931
16" S133
10" 16" S164
S145
10"
S146
8"
S147 14"
S149
30"
S149 16"
S149
16" 8" S179 15" S1983 8" S180 8" S182 8" S184S1465 10"S1465 10" 12" 27" S110A S129
8" S129 14" 10" S173 8"
S139 8"
S1026
8" 16"
S129 12" 10"
S129
10" 8" S171 8" S176
8" S1102
10" 8" 16" 14" S164 8" S165A 15" S165
S132 12" 12"
S132
10" 10"
S1105
8" 8" S1105
8"
8" 21"
18"
12"
S1463 S1844 8" S1465 10" S2193 10"
S110B
27"
S128
8" S1231
8" S1171 8" S176
8" 10"
S131 8" 10" S153
S131
S130A
8"
8"
10" 8" S578
S130
S130
12" 12"
S131 8" 8"
S1464
8" S1471 8" VERNON 15" 15" 18" 10" S169 18" 10" S1091 10" S1062 8" 8" S1003 10" 8" S1003 8" S151 8" S163 12" S159A 14" S159 14" 15" S159 15" 10"
S140 8" 18" S136A 8" S163 8" S151
18" 18"
S137A
10"
S135
15" 15" 14" 14" 12" S610
S137
12" 8" 10" S1246
10" 10" S1087 21" S1471 24" 8" S169 21"
10"
10" 12" 12"
14"
12"
S137
12" 14" 8" S1596S169
24" 8"S1831 12" S1790 8" 8"12" S1790 8" S610 8" S9478" S151 8" S163 S1472
24" 14" S167
S134 8" 10" 12" 10"
14" S134 12" S1489
S1490 8"
12" 8" S2355
6"
S1895
8" 8"
S1895
8"
S1489
15"
S1469
8" 12" 8" 15" S1539
10"
S1488
8"
S1487
12"
8"
S1759
12"
15"
S1487
15"
15" S1759
15"
S1562
12"
15"
S2100
10"
S1550
15"
S2277
12"
S2092
8"
S1548
8"
S1549 10"
S1568
8"
S1567
10"
S1584
8"
S1582
8"
8"
S1583 10"
10"
S1585 8"
S1582
8"
S1515 10"
S2092 12"
S1548 8" 10"S2064
10"
8"
S2017
8"
S2018
12"
15"
12"
12"
S2124 8"
8"
S2013
12"
S2513
10"
12"
S2514
8"
10"
12"
S2127
10"
8"
S2205
S2129
15"
15"
8"
8"
12"
15"
18"
18"
12"
10"
S2128
12"
12"
8"
15"
18"
21"
24"
12"
8"
S2025 8" 8" S1761 10" S185 8"
S1588 18" 36" S109 36" S109
S110B
18" & 24" S830
27" S1050 15" 18"
S1133 PVT. 8" 12" 12"
12"
S1050
18"
21"
21"
S1560 24" S136A 24" ALCOA
S163 21"
S1586
8"
12"
S2260
4"
S1643
8"
8"
18"
18"
21"
21"
24"
24"
21"
21"
21"
24"
S1875 CITY OF VERNON MAIN LINE 8" S1360 8" S1295 8" S283 1 2
313 12
11 10
9 8
7 6
5 4 14
15 16
17 18
19 2025 24
23 22
21 31 30
29 28
27 26 32 36 35
34 33
40 39
41 37
48 47
46 45
44 43A
43 38 49 42505152 99
98 97
96 95
94 93 929190 88 87 86 85 84 A 8489
81 82 8380 79 78 7776
58 59
60 6157 566263646566
75 74
73 72 71 67 706968
55 54
53 111 108
106
105
104 107 110 113 109 112
120 127 117 116 118 119
121
126
115
122
123
124
125
131
130
129
128
114 103 102 101 100
2 3
4 5
1 6
781314152122 23 16
9 10
11 12
17 18
19 20 120 121 122 123 124 125 126
132
131
133
141
140
135A
135
134 139 138 136 137 130 128 129
142
119
118 117
116
115
111 110
109 112 113 114
108
107
106
105
104 81
67 6665 26
25 24 646357564847 3562554634
33 28
30 31
32 29
39 37
38 36
49 50
51 54
53 52
45 4442 41 40
91 92
93 94 99 100 96
95 9798
68 69
70 71
72 73 74 7576 777879 103 80 102 101 9089 88 87 86
85 84
83 82
61 60
59 58 43
1 2
3 5
4 6
7 8
9 10
11 16
17 18
22 23
24 25
26 27
28 29
38 1314 15 12 19 20 21
30 31
32 33
34 35
36 37 40 41
39 1
2 1
2 3
4 4 A
1 2
3 4
5 6
7 8
916 1718 22232427
10" 2829303132
12 11
10 15
14 13
21 20
19 74
75 76
26 25
80 81
82 83
33 34
35 36
37 38
39 40
64 65
66 62
63 67
68 69
52 53
54 55
56 57
43 44
45 46
47 48
49 414250515859606170 717273 77787984858687888990919293949596 10 11
12 13
14 15
16 17
18 20
21 22
23 24
1 2
3 4
5 6
7 8
9 25
27 28
28 A
29 30
31 32
34 35 33
26 3642 4337
46 45
44 47
48 39
38 40
41 49505152535455565758
1 2
3 4
5 6
7 9
8 11
12 13 14 101516
17 21
18 19
20 222324282935
30 31
32 33
34 39 363738
40 41
42 43 4445464748495051525354
25 26
27 8
91011
7 6
1 2
3 5 12 13
1417 1615
18 19 2425262729
30 31
32 333435363738394051
1 2
3 4
5 6
8 9
7 11
10 12 13 14
18 19
15 16
17 2024
21 22
232526272833
29 30
31 32 3435
36 37
38 3940
40 A
40 B
40 D 424344454647 4849 50 41 51
55 54
53 52
1 2
3 4
5 6
7 8
10 11
12 13
14 15
16 17
22 23
24 18
9 19
20 21
2 1
2 3
2 3
6 5
4 1
1 1
2 3
4 15
14 11
12 13
10 8
9 7
6 5
4 3 2
1 3
2 1
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15
1 3
2 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20
6 7
8 91011 12 13
14 15
1 2
3 5
6 4
7 8
9 10
11 12
12 A 13
14 15
16 17
18 19
20 21
13 A 14 A
103
105
107
33 34
104
102
108
112
110
111
113
114
115
116
117
118
75 76
99 100
101
51 52
53 54
55 56
57 58
59 60
80 82
62 61
64 63
65 66
67 68
69 70
71 73
74 72
84 120
123
88 87
89 90
92 93
96 97
98 91 91 B
91 A
95 95 A
94 B
94 A94
40 C 4142434445
46 47
48 49
50 20
21 22
23 69 4344 35
37 38
39 4645 47
48 49
40 41
42 3436
58 59
61 62 60
52 53
54 55
56 57
8 7
6 5
4 19
18 17
16 15
14 13
12 18" 4
5 6
7 8
28 32
31 30
29 26
25 24
23 22
43 42
41 40
39 38
37 45
44 35
56 55
54 53
52 51
50 49
29 30
3 8" S1677
5 6
7S1858
9 108" 68 67
14 15
16 13
S1563
8" 1
2 145
132
21 22
23 59
58 57
36 46
27 33 2
1 9
33 66 65 64 63 51 50 3231 2827262419
4 20
P757
83A SEC. 2 SEC. 3 SEC. 1 SEC. 4 SEC. 5 SEC. 6 SEC. 7 SEC. 8 SEC. 9 SEC. 10 SEC. 11 SEC. 12 SEC. 13 SEC. 14
SEC. 15
SEC. 16
SEC. 17
SEC. 18
SEC. 19
SEC. 20
SEC. 21
SEC. 22
SEC. 23
SEC. 24 SEC. 25 S 2557
147
146
144
143
L. A. RIVER L.A. RIVER
L. A. RIVER
RIVER
L.A. 1-06 MAP UPDATE W.C. 3-08 CMD AREA MAP UPDATE E.S. 119 56A
106
109
85 86
122
121
S2123
12"
15"
S2513
21"
64C
64B
64D
64A
148
30 A 56 A 135 134 133
51A 51B
9 8
7 6
5 4 31-A 70 71 73 72 74 75 76 31-A 7778 3-09 PENNINGTON WAY. MAP UPDATE E.S.

PENNINGTON WY. 1-09 ALAMEDA AREA MAP UPDATE E.S.
12"
12" 1-10 PACKERS SEWER MAIN PRIVATE E.S.

MAYWOOD
42"
30" 30" 5-10 UPDATED SEC. 2,16 & 24 E.S.

S143
S143 10" S1861
C
C C
C
C C
C
C
C
C
4 C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
22 C CITY CONNECTION TO COUTNY 149 8-24 New Sewer main on 1st and MH #149 C.V. 3-20 Section 10 - MH #19 Remove C.V. 59 27 44 MILES OF SEWER (MAINTAINED BY THE CITY) 976 CITY-OWNED MANHOLES 180 COUNTY OWNED MANHOLES 27 CITY MAIN CONNECTION INTO COUNTY CITY OF VERNON Hotspot Monitoring SYSTEM CITY OF VERNON HOTSPOT (FY 2025-2026) 






 
 

 





 !

 
"#$%


&' 
()*+,-./00)12-
 
3
#
456'7
484

 
33$$
$!

94
 
3$$#:!
;
56'7
&
7

 

%"$<
<
&
7

 "
"
##<

='

66

 3

#"#
&6&' 
>
8 
?




 3

$




&' 


 !
@5A
4&>BCDE
 33
%$%
!
?6

5

7
 3$
3$

&6&' 
5
& 
 3
3
F
GF
<
H
<
?H!
 3


#

F
G7
 I 
H
 3"
%
"
?6
7&' 

 J





>&
; 6 ?





 3

%



&' I&6 7
 $
3
"!I&6 7
 
3"
"!I&6 7
 
3
%!I&6 7
 
$

#3I&6 7
 

#$
7I&6 7
 
#"
##!I&6 7
 
3$



&' I&6 7
 #
3%
#
!I&6 7
 
3
F
G7I5
7
56'7
 

$
5
7
56'7 

4
&' 
 %
&


4
&' 

!5
7
56'7
 "
"
6?
&' 

!56 &' 
 3

#"
6?
&' 

!&6&' 
 33
33
6?
&' 

!&6&' 
 3$
#3
68?
;:I&6&' @=
4
' 4

E
 3
##
6?
&'  &6&' 
 3
$3
5
7
56'7

!5

 5 !46
 3#
$
5
7
56'7

!B
7
&' 
 3
3
3
F
56'7I
?6
7&' 
 3

3
5
7
56'7?!?
6F

 3%

5
7
56'7?!&
&' 
 3"


?6
7&' ?!F
56'7
 $

3
5
7
56'7

!&
&' 
 $3
3
5
7
56'7 
3 G
 $$
"
&6
56'7I5
7
56'7












 !
!





 "#$%&



City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXM

INDEPENDENT COLLECTION/DISPOSAL

SERVICE VENDOR LIST
 







 






 
 
 






 
!

 

!!

"
#
!



$%



&
 '

(


)$' *+,-.,-/0/1-2
&

(

3

' *424.-450/626
&'

(

3

' *424.-450/626


$%


&




)$' *+,-.,-/0/1-2




 '

(



)$' *+,-./7,05,22
#%8 

(



) ' *7-7.66106444





' )
9:;&
)

' *712.+/606,+1


(#

%&8
)



) ' *7-7.5-101-/7

% 

 

(



) ' *7-7.-,40465,

98
 '

( 
&

' *712.+/6067+1

<
%&
) '

(

% ' *6++.-+-05,2,


City of Vernon
Sewer System Management Plan, Volume II
Update Report
August2026

APPENDIXN
2008 SEWER SYSTEM HYDRAULIC ANALYSIS