Work Order Signature Document
1158

3.00 Detailed Scope of Work
Jay KwonTo: From: Brian Gengler
Angeles Contractor Inc. City of Victorville
783 Phillips Drive 14343 Civic Drive
City of Industry, CA 91748 Victorville, CA 92323
714.290.7437 760.955.5135
Work Order Number:

June 13, 2022Date Printed:
102420.01
Victorville Wellness Center, phase 1 - supplemental #1Work Order Title:

Brief Scope: Additional items of scope, see DSOW breakdown.

Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work.

PHASE 1 SUPPLEMENTAL
WORK ORDER #102420.01 SCOPE OF WORK:

I. BUILDING 5, 6 & 7 CRUSHED ROCK AND WOVEN FILTER FABRIC MIRAFI 1120N A. Reference RFI No. ACI-59, 59.1 and 59.1r [Please refer to Attachment A] and Submittal #6 [Please refer to Attachment B]

1. Furnish and place filter fabric Mirafi 1120N in Building 5, 6 and 7 at the bottom of over-excavation grade

2. Cover filter fabric with crushed rock up to one foot thick layer

3. Cover top of crushed rock with filter fabric

4. Backfill with on-site sandy material [no import]
II. ATTACHMENTS

1. Attachment A-RFI No. 59, 59.1 and 59.1r

2. Attachment B-Response Submittal #6-Gravel and Filter Fabric III. CLARIFICATIONS:

1. Exclude all Phase 2 Work

2. Exclude import and export of soils

3. Exclude environmental clean up and disposal of hazardous materials and contaminated water Subject to the terms and conditions of ezIQC Contract CA-R8-GB06-123021-ACI.

Contractor Date
DateCity of Victorville

Page 1 of 1 ends

6/13/2022
Scope of Work
1159

4.00 Contractor's Price Proposal - Summary
Owner PO #:

Victorville Wellness Center, phase 1 - supplemental #1
102420.01
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

T
itle:

Re:

June 13, 2022Date:

Proposal Value:

Contractor: Angeles Contractor Inc.
$120,399.24
$2,591.77I.

Supplemental #1 Bond Fees
$117,807.47II. Bldg. 5, 6 & 7-Crushed Rock and Nonwoven Filter Fabric Mirafi 1120N Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$120,399.24
The Percentage of NPP on this Proposal: %

Page 1 of 1 ends

6/13/2022
Contractor's Price Proposal - Summary
1160

5.00 Contractor's Price Proposal - Detail
V
ictorville Wellness Center, phase 1 - supplemental #1
102420.01
CA-R8-GB06-123021-ACIIQC Master Contract #:

W
ork Order #:

Owner PO #:

Title:

Re:

June 13, 2022Date:

Proposal Value
:

Contractor: Angeles Contractor Inc.
$120,399.24
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.

I.

Supplemental #1 Bond Fees
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal.
1 $2,591.77
EA
Installation =x x 2,591.77
FactorUnit PriceQuantity Total

1.00 1.1000 2,356.15
Bond Fees [Total amount of $1
17,807.47 x 2% = $2,356.15
$2,591.77Subtotal for I. Supplemental #1 Bond Fees
II.

Bldg. 5, 6 & 7-Crushed Rock and Nonwoven Filter Fabric Mirafi 1120N 01 22 23 00 0227 11 To
12 Ton, Single Smooth Drum, Ride-On Self-Propelled Vibratory Roller With Full-Time Operator
2 $8,734.10DAY
Installation =x x 8,734.10
FactorUnit PriceQuantity Total
1,405.10 1.2432 5.00
Equipment for installation of rock/gravel
01 22 23 00 0285 2,500 LB Capacity, 78" Wide,
Tracked Skid-Steer Loader With Full-
Time
Operator
3 $8,436.79DAY
Installation =x x 8,436.79
FactorUnit PriceQuantity Total
1,357.27 1.2432 5.00
Equipment for installation of rock/gravel
01 22 23 00 0328 140 HP, D6 Bulldozer With Full-Time Operator4 $12,488.13DAY Installation =x x 12,488.13
FactorUnit PriceQuantity Total
2,009.03 1.2432 5.00
Equipment for installation of rock/gravel
01 22 23 00 1459 3,700 To 4,000 Gallon W
ater Truck With Full-Time Driver5 $9,821.65DAY
Installation =x x 9,821.65
FactorUnit PriceQuantity Total
1,580.06 1.2432 5.00
Equipment for installation of rock/gravel
01 74 19 00 0040 Hauling On Paved Roads, First 15 Miles6 $11,966.24CYM Installation =x x 1
1,966.24
FactorUnit PriceQuantity Total

0.89 1.2432 10,815.00
721
CY of loose rock delivery from W
est Coast Sand and Gravel plant locations at Lucerne Valley and Lancaster with average of 40 miles to job site = [40 mi less 15 mi included in task item 31051600-003 = 25 miles [This item include first 15 mi x 721 CY = 10815 CYM 01 74 19 00 0041 Hauling On Paved Roads, Miles Over Initial 15 Miles7 $5,378.08 CYM
Installation =x x 5,378.08
FactorUnit PriceQuantity Total

0.60 1.2432 7,210.00
721
CY of loose rock delivery from W
est Coast Sand and Gravel plant locations with average of 40 miles to job site = [40 mi less 30 mi included in task item 31051600-003 & 01 74 19 00-0040 = this item 10 mi x 721 CY = 7210 CYM]

Page 1 of 2 ends

6/13/2022
Contractor's Price Proposal - Detail
1161
Contractor's Price Proposal - Detail Continues..

Work Order Title:

Work Order Number: 102420.01
V
ictorville Wellness Center, phase 1 - supplemental #1
II. Bldg. 5, 6 & 7-Crushed Rock and Nonwoven Filter Fabric Mirafi 1120N 31 05 16 00 0003 #3 Stone Aggregate Fill (1" T
o 2" Clean)8 $40,900.32CY
Installation =x x 40,900.32
FactorUnit PriceQuantity Total

45.63 1.2432 721.00
#3 Rock Material [17696 SF x 1' ÷ 27 = 655 CY plus
10% compacted = 721 CY: Task Item
Description-Aggregate (Loose, Purchased Material) Includes delivery up to 15 miles from the closest approved source, loading and dumping. Excludes spreading or backfilling. See CSI section 01 74 19 00-0039 for hauling greater than 15 miles.
31 05 16 00 0003 0057 For >96, Deduct9 -$6,803.28
MOD
Installation =x x -6,803.28
FactorUnit PriceQuantity Total
-7.59 1.2432 721.00
31 32 19 16 0010 16 Ounce/SY, 175 Mil, 425 LB Grab T ensile Nonwoven Polypropylene
Geotextile Fabric
10 $26,885.44SY
Installation =x x 26,885.44
FactorUnit PriceQuantity Total

5.50 1.2432 3,932.00
Nonwoven geotextile fabrics Mirafi 1120N with envelope measurement as follows - Bldg. 6&7 main pad 162'x58'=9396SF + corners/wings 25'x20'x4=2000SF + Bldg. 5 main pad 85'x60'=5100SF + corners/wings 30'x20'x2=1200SF, total of 17,696SF x 2 for bottom and top layer of rock = 35,392 SF ÷ 9 = 3,932 SY $1
17,807.47Subtotal for II. Bldg. 5, 6 & 7-Crushed Rock and Nonwoven Filter Fabric Mirafi 1120N
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$120,399.24
The Percentage of NPP on this Proposal: %

Page 2 of 2 ends

6/13/2022
Contractor's Price Proposal - Detail
1162
Subcontractor Listing
102420.01
Victorville W
ellness Center, phase 1 - supplemental #1
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

June 13, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$120,399.24
%DutiesName of Contractor Amount
MMG Engineering, Inc. Site Grading, Filter Fabric and Crushed Rock Fill 85.48$102,921.55

6.00

Page 1 of 1 ends

6/13/2022
Subcontractor Listing
1163

REQUEST FOR INFORMATION
Contractor:

Angeles Contractor, Inc. RFI No.
783 Phillips Drive RFI Date:

City of Industry, CA 91748
Construction Manager: Project Name:

Project No:

Subject:

Reference:

Drawing No:

Fax: Specification:

Respond by: High priority Submitted by:

Questions or Clarification:

Proposed Solution / Recommendation:

Potential cost impact? Yes Potential schedule impact? Response:

Response by:

Date:

No Yes No
Tel:

ACI - 59
04-25-2022
Victorville Wellness Center
2369A
Underground water directive for buildings
Precise Grading Plans
Pacifica Services Inc,
We have encountered the ground water at Building #5 and #7 at the approximate elevation of 2,699'.

Please advise the directions for the Building footings.

David Bosman - KWC
April 25, 2022
Ayman Hanna
(626) 405-0131
7106 S Mentor Ave #200
Pasadena, CA 91106
TBD
TBD
"David Bosman - KWC"
"David Bosman - KWC" KWC is currently looking into a couple options to address the high water table issue. KWC is going to raise the pad elevations utilizing utility spoils and in conjunction will specify a concrete slab in the crawl space. Other mitigation measures to address the water issue will be provided in the details on the plans, such as water proofing retaining walls, plastic sheating, etc. 1164
1165

REQUEST FOR INFORMATION
Contractor:

Angeles Contractor, Inc. RFI No.
783 Phillips Drive RFI Date:

City of Industry, CA 91748
Construction Manager: Project Name:

Project No:

Subject:

Reference:

Drawing No:

Fax: Specification:

Respond by: High priority Submitted by:

Questions or Clarification:

Proposed Solution / Recommendation:

Potential cost impact? Yes Potential schedule impact? Response:

Response by:

Date:

No Yes No
Tel:

TBD TBD
ACI - 59.1
05-06-2022
Victorville Wellness Center
2369A
Underground water directive for buildings
Precise Grading Plans
Pacifica Services Inc,
Please provide geotechnical recommendation on how to move forward with our backfill and compaction, Where water has been encountered at Bldg.s 5, 6, and 7 and is currently standing water, Ayman Hanna
(626) 405-0131
7106 S Mentor Ave #200
Pasadena, CA 91106
MBPro Response: The representative of the Geotechnical Engineer should check the bottom of the excavations for disturbed subgrade soils. Where present, it is recommended to remove all disturbed soils from the bottom of the excavations using a flat bottom bucket (toothless), a dozer blade or similar equipment. Following bottom approval, the geotextile fabric should be placed and covered with a minimum of 6 inches of one-inch crushed rock (Greenbook specifications or equivalent). The crushed rock thickness should be increased, as necessary, where the conditions dictate, and should be extended at least 6 inches above groundwater. Where “pumping conditions” have developed, the crushed rock thickness should be increased to about 12 to 15 inches, depending upon the conditions observed in the field. The top of the rock should be covered with geotextile fabric before placement of the onsite sand. Where water is present at the bottom of the excavations, the geotextile should consist of a non-woven fabric such as Mirafi 1120N (or approved equivalent), which can serve as a separation, a stabilization and a drainage fabric, since a woven fabric may float and impede compaction because of its relative imperviousness. For the locations above groundwater, the geotextile may consist of woven fabric such as Mirafi 500 X or approved equivalent. An alternative to placement of rock and fabric would be to lower the groundwater by 18 inches during the placement of the first 15 inches of soil backfill. MBPro 5/6/22 1166

REQUEST FOR INFORMATION
Contractor:

Angeles Contractor, Inc. RFI No.
783 Phillips Drive RFI Date:

City of Industry, CA 91748
Construction Manager: Project Name:

Project No:

Subject:

Reference:

Drawing No:

Fax: Specification:

Respond by: High priority Submitted by:

Questions or Clarification:

Proposed Solution / Recommendation:

Potential cost impact? Yes Potential schedule impact? Response:

Response by:

Date:

No Yes No
Tel:

TBD TBD
ACI - 59.1
05-06-2022
Victorville Wellness Center
2369A
Underground water directive for buildings
Precise Grading Plans
Pacifica Services Inc,
Please provide geotechnical recommendation on how to move forward with our backfill and compaction, Where water has been encountered at Bldg.s 5, 6, and 7 and is currently standing water,

Ayman Hanna
(626) 405-0131
7106 S Mentor Ave #200
Pasadena, CA 91106
The recommendations for subgrade preparation including the placement of crushed rock enveloped in fabric should only be performed in areas of visible standing water and where compaction is not feasible (currently Bldg Pads 4,5,6,7 to the extent of where the water is visible).

The crushed rock layer should extend above the water table level prior to the placement of fill material.

Follow recommendations for Gravel thickness as described in RFI 59.1 Response #1 #2:

Albert Buffet
05/19/22
1167
Victorville Wellness Center
SUBMITTAL NO.-006
Angeles Contractor certifies that review, verification of Product required, field dimensions, adjacent construction work, and coordination of information, is in accordance with the requirements of the work and Contract Documents Initial: AH Date: 05/12/2022
PROJECT: Victorville Wellness Center
Owner City of Victorville
Project Management Pacifica Services, Inc.

ARCHITECT : CMC Architecture & Engineers
Engineers KWC Engineers
MEP Engineering & Design Enginerous Group
DATE: 05/12/2022
SUBCONTRACTOR: MMG Engineering, Inc.

Submittal For: 1” Rock and Geotextile
0LUDIL1 ;
ITEM SUBMITTED: Material Specifications, Lab tests, and supplier’s data.

REVIEWED BY:

Pacifica
CMC
Enginerous Group
KWC
ACI – Ayman Hanna
REMARKS:
"David Bosman - KWC" KWC is ok with 1" rock and Mirafi
1120N geotextile fabric for bedding under crawl space
1168

CITY OF VICTORVILLE

ENGINEERING DEPARTMENT

BRIAN GENGLER
FIELD BOOK NO. (S)
APPROVED BY:

CITY ENGINEER
REVISIONNO. BY
14343 Civic Drive, Victorville, Ca. 92392 (760) 955-5158 R.C.E. 44730
EXP. 03-31-24
CHECKED BY:
1/3/22DATE:

DATE:

DESIGN BY:

DRAWN BY:

C.S.

DATE
PROJECT NO.

DRAWING No.

TBD
OF 14
SHEET NO.

XX-00

PRECISE GRADING PLAN
C.S.

VICTORVILLE WELLNESS CENTER
78472 No.

CIVIL

STATEOFCALIFORNIA

REENIGNELAN

DERETSIGER
OISSEFORPBRANDON M. BARNETT
D.B.

Underground Service Alert

TWO WORKING DAYS BEFORE YOU DIG
BENCHMARK: (1987) NATIONAL GEODETIC SURVEY MONUMENT;
5/8" ROD IN WELL COVER; 30 FT. WEST OF WEST RAILROAD
TRACK OPPOSITE OWL CONCRETE PLANT; 6,0000 FT. NORTH OF
HWY 15 ALONG NATIONAL TRAILS HWY.

ELEVATION = 2681.6 COV CONTROL #B1407
WDID: 6B36C396947 CASE NO: BLDR21-01212
KWC File: R:\20\2106\FINAL\CONST\PGRD\2106 PGRD 03.dwg
Created: May. 04, 2022 02:53:32PM Last Save: May. 04, 2022 02:54:47PM Plot Date: May 05, 2022 01:55:19 PM BY: TCha PRECISE GRADING PLANS - 4th SUBMITTAL
20'

PRIVATE APPARATUS FIRE ACCESS ROAD
2 PRIVATE FIRE APPARATUS ACCESS ROAD
NTS

DETAIL SHEET
3 5
4' RIBBON GUTTER
NTS
4" CLASS II

AGGREGATE BASE
CEMENT CONCRETE W/ 10" X
10"-1.4" X 1.4" W.W.M.

REINFORCEMENT
A.C.
3/8" LIP
(TYP.)
8"
1"
1" 2' 2'
4'

AREA DRAIN PER PLAN
1' WIDE MOW
CURB (TYP.) PER

DETAIL HEREON
EX. SLOPE
MOJAVE

RIVER LEVEE
PROP. FS

2.0%

CITY OF VICTORVILLE
2:1 MAX20.0'
4' 4'

WELLNESS CENTER

SECTION B-B
36" 3'-4" 5'-0" 3'-8"
30" 3'-0" 4'-6" 3'-0"
PIPE
DIA.

L E F W

DIMENSIONS
E
8"
L
F
12"
6"
W
3"
MIN.
3"
MIN.
2'-0"2'-6"
6"
12"
D
D+6"
6"
4"
8"
4"
8"
4"
4"

1. HEADWALL SHALL BE CONSTRUCTED OF CLASS A CONCRETE.

2. REINFORCING STEEL SHALL BE NO. 4 BARS FOR "W" UP TO

3. ADJACENT SLOPES SHALL BE 1-1/2 TO 1 OR FLATTER.

4. MULTIPLE PIPES TO BE SET WITH LONGITUDINAL CENTERS

5. ALL EXPOSED CORNERS TO BE ROUNDED 3/4" RADIUS.

6. W SHALL BE INCREASED WHEN MULTIPLE PIPES OR PIPES
60". ABOVE "W"=60" NO. 5 BARS SHALL BE USED. 2" MIN.

CLEARANCE, 30 DIA. LAP, ALL STEEL.
1-2/3 DIA. APART.

ON SKEW ARE USED.
6"
24" 4'-9" 2'-8" 4'-0" 2'-6"

PIPE CULVERT HEADWALL OUTLET STRUCTURE
NTS

SECTION VIEW
PLAN

REINFORCING DETAIL

1.0% MIN.

GROUND LINE

STORM DRAIN, SIZE PER PLAN

HEADWALL SHALL BE
MONOLITHIC. LAP ALL BARS AT
CORNERS 30 DIAMETERS IF NOT
CONTINUOUS.
2-#5
#4 OR 5 12"
O.C. EA. WAY
SEE NOTE 2
2-#4 OR 5
SEE NOTE 2
12'' GRAVEL (3/4'') BASE
CONTINUOUS BAR 90° BEND
#4 OR 5 12"
O.C. EA. WAY
SEE NOTE 2
2-#4 OR 5
SEE NOTE 2
NOTES:

TOP OF WALL

PER PLAN
1 4 TON RIP RAP PROTECTION

FRONT ELEVATION

TOP OF WALLPER PLAN
FL

PER PLAN
5'-5"
6'-0"
PROP. WROUGHT

IRON FENCE
28 CONCRETE FOOTING

PER STRUCTURAL

DRAWINGS
18"
MIN

RETAINING
WALL

RETAINING WALL
NTS8
6" 6"2'
10"
6"6"4"

CLASS II

AGGREGATE BASE
CEMENT

CONCRETE

CONCRETE CURB CHANNEL
NTS10SCALE: 1"=10'

NATIVE RECOMPACTED SOIL
( 90% RELATIVE COMPACTION)
PL
4"
NOTES:

1. CLASS 500-C-3250 PCC; CURED WITH CURING COMPOUND

2. ALL EXPOSED CORNERS SHALL BE FINISHED WITH 1/2" RADIUS

REINFORCEMENT

3. FINISH SHALL BE LIGHT BROOM

4. RIBBON GUTTER SHALL HAVE WEAKENED PLANE JOINTS AT
10' INTERVERALS; NO SCORELINE ALLOWED

COMPACTED BACKFILL
6"X6" - W 1.4" X
W 1.4" W.W.M.

REINFORCEMENT

SECTION A-A
SCALE: 1"=10'

1.0% MIN.

RIPRAP PROTECTION

LENGTH & WIDTH PER PLAN
6'' FILTER BLANKET
NO. 2 BACKING CLASS
MIRAFI 1100N FILTER FABRIC

OR APPROVED EQUAL
3' THICK 1/4 TON

RSP CLASS RIPRAP
6"
5"
4'
6"
6"
6"
2" 3"
5"
2-#3 REBARS
SEAL 12" DEEP

HOLE W/ MORTAR
#6 @ 2'-6" LONG
2-1" Ø HOLES

WHEEL STOP
NTS
6 TYPICAL BUILDING SECTION A-A
NTS

PRIVATE FIRE APPARATUS

ACCESS ROAD PER

DETAIL HEREON
10'
MIN
8'

MODULAR
6' & 8'
VARIES
8'

MODULAR
10'
MIN
FFFF

SEE RETAINING WALL

DETAIL HEREON
18" (MIN)
2"
LIP
14"
5%
MIN. 2%
MIN.

PAD LINE

COMPACT BASE
.
.

CONCRETE SLAB
NTS
4'' CONCRETE SLAB w/ WIRE
MESH w/ 6x6 #10/10 WELDED

ON CLEAN COMPACTED FILL
4'' MAX
FG
8''

COMPACTED
SUB-GRADE CRUSHED 3
4" MAX AGGREGATE
SUB-BASE MIN 4" THICK
(NO CRUSHED CONCRETE)
WELDED WIRE MESH w/ EX6
#10/10
4''
FULL DEPTH 1
2"

EXPANSION JOINT
PROP. CONCRETE
(WHERE OCCURS)

COMPACTED

SUB-GRADE
8"x8" THICKENED EDGE w/ 15
REINFORCEMENT BAR CONT.

FL

PER PLAN
DECK

SECTION VIEW

1. 1/4" EXPANSION JOINT SHALL BE PLACED @ 40' INTERVALS

2. 1/8" x 1/2" PLASTIC CONTROL OR WEAKENED PLANE JOINTS SHALL BE PLACED @ 10' INTERVALS

3. CONCRETE SURFACE SHALL BE NON-SLIP, BROOM FINISH

4. ALL EXPOSED CORNERS ON SIDEWALK SHALL BE ROUNDED OFF WITH A 1/2" RADIUS NOTES:

5. CONCRETE SHALL BE 520-C-2500

1. CONCRETE SHALL BE 520-C-2500

2. WEAKENED PLANE JOINTS SHALL BE PLASTIC CONTROL JOINTS OR 11/2" DEEP SAWCUTS

3. FINISH SHALL BE LIGHT BROOM

4. ALL EXPOSED CORNERS SHALL BE ROUNDED OFF WITH A 1/2" RADIUS NOTES:

WHICH SHALL TAKE PLACE WITHIN 24 HOURS AFTER CONCRETE IS PLACED 1"8"

AGGREGATE BASE COURSE
(1 1
2" AGGREGATE)

SAND LEVELLING COURSE

CONCERETE WEARING COURSE
(LIGHT BROOM FINISH)
6"
1 2" RADIUS
(TYP)
2"
MIN

2.01' *
3-BLOCKS
* CA BUILDING CODE DESIGNATES CRAWL
SPACE 18" MIN. THIS PLAN ASSUMES USING
3 WHOLE BLOCKS (0.67'x3=2.01') FOR

RETAINING WALL TO TOP OF FOOTING (TF)
TF
FG
TW
2" GAP (FOR SHIMMING &

AIR SPACE (TYP)
EVERY 6TH BLOCK ALONG TOP

ROW TO BE BREEZE BLOCK
4" TO 6" BY 12" DEEP GRAVEL
POCKET w/ 1/2" TO 1 NATURAL

GRAVEL (NO FINES)
4" PERFORATED DRAIN PIPE
w/GRAVEL BACKFILL

CONNECT SLOPED DRAIN

AWAY FROM WALL TO AREA

DRAIN SYSTEM
4:1 MAX
SD LINE "A"
24" RCP

ROCK RIP RAP SEE

DETAIL HEREON
BOT = 2701.0
HW ELEV = 2703.5
EX. GROUND
PROPOSED INFILTRATION BASIN L=510' W=130'
V BMP=159,895 CF
MIRAFI 1100N FILTER FABRIC

OR APPROVED EQUAL

DOUBLE BLOCK PIER
@ MID-SPAN SINGLE BLOCK PIER
@ CORNERS

0.5%
18" (MIN)
PER STRUCT.
3' (MIN)

OVER-EX
6"
MIN

GRAVEL BED PER SOIL ENGINEERS

RECOMENDATION

SLOPE CRAWL SPACE FLOOR

0.5% AWAY FROM CENTER

GEOTEXTILE FABRIC PER SOIL

ENGINEER'S RECOMMENDATION
TF
WATER TABLE ELEV = 2699
FG
MiraDRI 860 WATERPROOF

MEMBRANE OR APPROVED EQUAL
AMENDED PAD ELEVS 05-02-22
SPILLWAY CREST 2704.5
2704.0 FG 1.0%
MIRAFI 1100N FILTER FABRIC

OR APPROVED EQUAL

INSTALL APPROVED RODENT

BARRIER AT ALL PERIMETER

OPENINGS
RECOMPACT TO 95%

RELATIVE COMPACTION
MIRAFI 1100N FILTER FABRIC

OR APPROVED EQUAL
4" TO 6" BY 12" DEEP TRENCH w/1"
TO 1 1/2" NATURAL GRAVEL
1169
Mirafi® N-Series Nonwoven Polypropylene Geotextiles
for Soil Separation and Drainage
Protective & Outdoor Fabrics
Aerospace Composites
Armour Composites
Geosynthetics
Industrial Fabrics
Synthetic Grass
TenCate develops and produces materials
that function to increase performance,
reduce costs and deliver measurable results
by working with our customers to provide
advanced solutions.

The Difference Mirafi
® N-Series Nonwoven
Geotextiles Make:
• Construction. Mirafi® N-Series polypro-
pylene nonwoven geotextiles easily con-
form to the ground or trench surface for
trouble free installation.
• Strength. Mirafi
® N-Series geotextiles
withstand installation stresses with high
puncture and tear resistance.
• Drainage. High permittivity properties pro-
vide high water flow rates while providing
excellent soil retention.
• Environmental. Mirafi
® N-Series geotex-
tiles are chemically stable in a wide range
of aggressive environments.
• Cost Effective. Mirafi
® N-Series geotex-
tiles provide economical solutions to many
civil engineering applications including a
cost effective alternative to graded aggre-
gate filters.

APPLICATIONS
Mirafi
® N-Series nonwoven geotextiles are
used in a wide variety of applications includ-
ing soil separation and drainage applications.

Lightweight nonwovens are predominantly
used for subsurface drainage applications
along highways, within embankments, under
airfields, and athletic fields. For these drain-
age structures to be effective, they must
have a properly designed protective filter.

Mirafi
® N-Series nonwoven geotextiles elimi-
nates the challenge of determining the
aggregate gradation required to match soil
conditions, finding a convenient and econom-
ical source of a specific aggregate, transport-
ing and placing graded aggregate, and assur-
ing that the constructed in-place drainage
system provides effective filter performance.

Heavyweight nonwovens are used in critical
subsurface drainage systems, soil separa-
tion, permanent erosion control, and
geomembrane liner protection within land-
fills. These geotextiles provide the required
strength and abrasion resistance to with-
stand installation and application stresses to
create an effective, long term drainage solu-
tion.

INSTALLATION GUIDELINES*
French and Trench Drains Geosynthetic Placement
Cut geosynthetic to proper width prior to
placement. Width should be enough to con-
form to the trench perimeter with at least a
6in (15cm) top overlap. Place the geosynthe-
tic roll over the trench, and unroll enough
geosynthetic that the geosynthetic can be
placed down into the trench. Anchor the
edges of the geosynthetic with heavy objects
to prevent the geosynthetic from falling into
the trench. Where overlaps are necessary
between rolls, allow for 3 ft (1m) overlap
from the upstream to the downstream roll.
* These guidelines serve as a general basis for installation.

Detailed instructions are available from your TenCate® rep- resentative.

Mirafi® N-Series Nonwoven Geotextiles
1170
Mirafi® N-Series Nonwoven Polypropylene Geotextiles
for Soil Separation and Drainage
365 South Holland Drive
Pendergrass, GA 30567
Tel 800 685 9990
Tel 706 693 2226
Fax 706 693 4400
www.mirafi.com
Mirafi® N-Series Nonwoven Geotextiles
Cut-off/Interceptor Drain Along a Roadway
Or Another Critical Structure
French Drain Without Pipe Liner Protection Within a Landfill /thetile/thetile/thetile/thetile
/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile /thetile
/thetile/thetile/thetile/thetile/thetile
/thetile
/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile
MIRAFI

N-SERIES

AGGREGATE

PAVEMENT

PERFORATED
PIPE
/thetile/thetile/thetile/thetile
/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile /thetile
/thetile/thetile/thetile/thetile/thetile
/thetile
/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile

AGGREGA TE
MIRAFI

N-SERIES
/thetile/thetile/thetile/thetile
/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile
/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetileMIRAFI N-SERIES /thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile /thetile
/thetile/thetile/thetile/thetile/thetile
/thetile
/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile /thetile/thetile/thetile/thetile/thetile/thetile/thetile/thetile /thetile/thetile/thetile/thetile/thetile /thetile WOVEN

GEOTEXTILE
LINER

DRAINAGE LAYER
TenCate Geosynthetics Americas assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate Geosynthetics Americas disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation any implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment, materials, or information furnished herewith. This document should not be construed as engineering advice.

Mirafi
® is a registered trademark of Nicolon Corporation. © 2016 Nicolon Corporation. All Rights Reserved.

PDS.N1217

QQUUAALLIITTYY

AASSSSUU RR AA NNCCEE

ACCREDITEDACCREDITED

LABORATORYLABORATORY
GAI-LAP-25-97GAI-LAP-25-97
ISO 9001 FM 61026
Property / Test Method Units 140NL 140NC 140N 160N 170N 180N 1100N 1120N 1160N MECHANICAL PROPERTIES Minimum Average Roll Value Grab Tensile Strength
ASTM D4632
Strength lbs (N) 90 (401) 100 (445) 120 (534) 160 (712) 180 (801) 205 (912) 250 (1113) 300 (1335) 380 (1691) Elongation % 50 50 50 50 50 50 50 50 50 Trapezoid Tear Strength lbs 40 45 50 60 75 80 100 115 140 ASTM D4533 (N) (178) (200) (223) (267) (334) (356) (445) (512) (623) CBR Puncture Strength lbs 250 250 310 410 450 500 700 800 1025 ASTM D6241 (N) (1113) (1113) (1380) (1825) (2003) (2224) (3115) (3560) (4561)

HYDRAULIC PROPERTIES
Maximum Opening Size
Apparent Opening Size (AOS) US Sieve 50 70 70 70 70 80 100 100 100 ASTM D4751 (mm) (0.30) (0.212) (0.212) (0.212) (0.212) (0.18) (0.15) (0.15) (0.15) Minimum Roll Value
Permittivity sec-1 2.0 2.0 1.7 1.5 1.4 1.4 0.8 0.8 0.7 ASTM D4491
Flow Rate gal/min/ft2 145 140 135 110 105 95 75 65 50 ASTM D4491 (l/min/m2 ) (5907) (5704) (5500) (4481) (4278) (3870) (3056) (2648) (2037) Minimum Test Value
UV Resistance after 500 hrs. % strength 70 70 70 70 70 70 70 70 70 ASTM D4355
Packaging Units 140NL 140NC 140N 160N 170N 180N 1100N 1120N 1160N Roll Width ft (m) 12.5 (3.8) 12.5 (3.8) 12.5 (3.8) 12.5 (3.8) 12.5 (3.8) 12.5 (3.8)

15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) 15.0 (4.57) Roll Length ft (m) 360 (110) 360 (110) 360 (110) 300 (91.4) 300 (91.4) 360 (110) 300 (91.4) 300 (91.4) 150 (46) 360 (110) 360 (110) 300 (91.4)
Area yd2 (m2 ) 500 (418) 500 (418) 500 (418) 500 (418) 500 (418) 500 (418) 500 (418) 500 (418) 250 (209) 600 (502) 600 (502) 600 (502) 600 (502) 600 (502) 600 (502) Note: Values and methods could change without notice
1171

365 South Holland Drive Tel 706 693 2226 Fax 706 693 4400 Pendergrass, GA 30567 Tel 888 795 0808 www.tencate.com FGS000357
ETQR29

TENCATE GEOSYNTHETICS
Americas
GAI-LAP-25-97
Mirafi® 1120N
Mirafi® 1120N is a needlepunched nonwoven geotextile composed of polypropylene fibers, which are formed into a stable network such that the fibers retain their relative position.

Mirafi® 1120N is inert to biological degradation and resists naturally encountered chemicals, alkalis, and acids.

TenCate Geosynthetics Americas Laboratories are Geosynthetic Accreditation Institute – Laboratory Accreditation Program (GAI-LAP).

Mechanical Properties Test Method Unit
Minimum Average
Roll Value
MD CD
Grab Tensile Strength ASTM D4632 lbs (N) 300 (1335) 300 (1335) Grab Tensile Elongation ASTM D4632 % 50 50
Trapezoid Tear Strength ASTM D4533 lbs (N) 115 (512) 115 (512) CBR Puncture Strength ASTM D6241 lbs (N) 800 (3560)
Maximum Opening Size
Apparent Opening Size (AOS) ASTM D4751 U.S. Sieve (mm) 100 (0.15) Minimum Roll Value
Permittivity ASTM D4491 sec-1 0.8
Flow Rate ASTM D4491 gal/min/ft2 (l/min/m2) 65 (2648)
Minimum Test Value
UV Resistance (at 500 hours) ASTM D4355 % strength retained 70 Physical Properties Unit Roll Size
Roll Dimensions (width x length) ft (m) 15 x 300 (4.57 x 91.4) Roll Area yd2 (m2) 500 (418)
Disclaimer: TenCate assumes no liability for the accuracy or completeness of this information or for the ultimate use by the purchaser. TenCate disclaims any and all express, implied, or statutory standards, warranties or guarantees, including without limitation an y implied warranty as to merchantability or fitness for a particular purpose or arising from a course of dealing or usage of trade as to any equipment , materials, or information furnished herewith. This document should not be construed as engineering advi ce.

Mirafi® is a registered trademark of Nicolon Corporation Copyright © 2015 Nicolon Corporation. All Rights Reserved. 1172

Mirafi® 500X is a woven geotextile composed of polypropylene fibers, which are woven into a stable network such that the fibers retain their relative position. Mirafi® 500X is inert to biological degradation and resists naturally encountered chemicals, alkalis, and acids. Mirafi® 500X meets AASHTO M288 Strength Class 3 for Elongation < 50%.

TenCate Geosynthetics Americas Laboratories are accredited by Geosynthetic Accreditation Institute – Laboratory Accreditation Program (GAI-LAP). NTPEP Listed

MECHANICAL PROPERTIES TEST METHOD UNIT

MINIMUM AVERAGE

ROLL VALUE

MD CD
Grab Tensile Strength ASTM D4632 lbs (N) 200 (890) 200 (890) Grab Tensile Elongation ASTM D4632 % 15 15
Trapezoid Tear Strength ASTM D4533 lbs (N) 75 (334) 75 (334) CBR Puncture Strength ASTM D6241 lbs (N) 700 (3115)

MAXIMUM OPENING SIZE
Apparent Opening Size (AOS)

ASTM D4751 U.S. Sieve (mm) 40 (0.425)

MECHANICAL PROPERTIES TEST METHOD UNIT MINIMUM ROLL VALUE Permittivity ASTM D4491 sec-1 0.05
Flow Rate

ASTM D4491

gal/min/ft² (l/min/m²) 4 (163)

MINIMUM TEST VALUE
UV Resistance (at 500 hours) ASTM D4355 % strength retained 70

PHYSICAL PROPERTIES UNIT ROLL SIZE
Roll Dimensions (width x length) ft (m) 12.5 x 432 (3.8 x 132) 15 x 360 (4.5 x 110)

17.5 x 309 (5.3x94.2)
Roll Area yd2 (m2) 600 (502)
Roll Weight lbs (kg) 177 (80)
Label Color

1173

G E N E R A L E N G I N E E R I N G C O N T R A C T O R Victorville Wellness Center
City of Victorville
General Contractor: Angeles Contractor, Inc.

Rock
1” Rock
Supplier: Hi-Grade Materials
Notes:
• SSPWC – No. 3 Rock
1174
ARAGÓN GEOTECHNICAL, INC .
16801 Van Buren Blvd.

Riverside, California 92504
(951) 776-0345
Subject:

Sample ID 21-1134, 1.0" Aggregate (2018 SSPWC No. 3 Rock / ASTM C33 No. 56 Rock) Dear Mr. Reder,
Project No.: 4482-TR
C33 Annual Qualification Testing - Lucerne Valley Quarry Hesperia, California 93345

2. Specific Gravity (ASTM C127)
Respectfully Submitted,
Luis Arguello III, M.S., E.I.T.

Project Engineer/Manager
The laboratory results are included on the next page of this transmittal. AGI trusts that this report will meet your current needs. If you should have any questions, please do not hesitate to contact us.

3. Cleanness Value (Cal Test 227)

4. Los Angeles Abrasion (ASTM C131)

5. Clay Lumps & Friable Particles (ASTM C142)

6. Lightweight Pieces in Aggregates (ASTM C123)

7. Sodium Sulfate Soundness (ASTM C88)
C. Fernando Aragón, P.E., G.E.

Principal Engineer
March 25, 2021
Aragón Geotechnical, Inc. (AGI) proudly presents the results of laboratory tests performed on 1.0" Aggregate (2018 SSPWC No. 3 Rock / ASTM C33 No. 56 Rock). The sample was sampled by an employee of Hi-Grade Materials on March 11th, 2021 and received by our laboratory that same day. Per your request the following tests were performed:

1. Sieve Analysis (ASTM C117/C136)

SUMMARY OF LABORATORY RESULTS
Hi-Grade Materials
Attn: Mr. Stefan Reder
Quality Control Manager
17671 Bear Valley Road

Page 1 of 2 ends

DBE No. 45365
SBE No. 1182800
DIR No. 1000008509
1175
Project Name:

Lab No.: 21-1134
Project No: Sampled By: Report Date: March 25, 2021 Client: Date of Sampling:

Information Provided by Laboratory Technician X
X
Tested By: Date Received: 3/11/21
Location Sampled: Date Tested: 3/11/21 to 3/25/21
Specifications: Source: Lucerne Valley Quarry
Sample Description:

Reviewed by:

Unless otherwise noted, material was sampled in accordance with ASTM D75 by the client.Remarks:

Project Engineer/Manager
Date:

ARAGÓN GEOTECHNICAL, INC .
16801 Van Buren Blvd.

Riverside, California 92504
(951) 776-0345
Report of Aggregate Laboratory Testing
Lucerne Valley Quarry - Annual C33 Qualification
8701 Meridian Road
Lucerne Valley, California 92356
4482-TR Client
Preparation and Wash Method Used B - Wetting Agent Oven Dry Preparation Modified Air Dry Preparation
Miguel Robles / Eric Doerschlag / Cesar Lopez
Hi-Grade Materials March 11, 2021
17671 Bear Valley Road
Hesperia, California 93345
A - Plain Water Moist Preparation
Stockpile
2018 SSPWC No. 3 Rock / ASTM C33 No. 56 Rock

1.0-in. Aggregate
Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. AGI makes no representation or opinion to origin or composition of the above material.

Remarks: No modifications made to test method, followed exact test procedure.

March 25, 2021
Luis Arguello III, M.S., E.I.T.

All materials were sampled and tested per the project approved documents.

All materials tested met project approved plans & specifications.

All materials tested did not meet project approved plans & specifications.

ASTM/CTM
Standards
Used
% Passing
SSPWC
Specifications -
Section 200-1.4
(No. 3 Rock)
ASTM C33
Specifications
(No. 56 Rock)
Pass / Fail
2" 50.0 mm 100 --- --- ---
1 1/2" 37.5 mm 100 100 100 Pass
1" 25.0 mm 95 90 - 100 90 - 100 Pass
3/4" 19.0 mm 70 55 - 85 40 - 85 Pass
1/2" 12.5 mm 31 --- 10 - 40 Pass
3/8" 9.5 mm 13 8 - 20 0 - 15 Pass
#4 4.75 mm 3 0 - 5 --- ---
#8 2.36 mm 2 0 - 5 --- ---
#16 1.18 mm 2 --- --- ---
#30 600 μm 2 --- --- ---
#50 300 μm 2 --- --- ---
#100 150 μm 2 --- --- ---
#200 75 μm 1.4 0 - 2 --- Pass

ASTM/CTM
Standards
Used
Result
SSPWC
Specifications -
Section 200-1.4
(No. 3 Rock)
ASTM C33
Specifications
(No. 56 Rock)
Pass / Fail
8% 15% Max. --- Pass
34% 52% Max. 50% Max. Pass
ASTM C142 0.7% --- 3.0% Max. Pass

2.654 --- --- ---

2.691 2.58 Min. --- Pass

2.755 --- --- ---

1.4% --- --- ---
CTM 227 91 75 Min. --- Pass
ASTM C88 0.3% 10.0% Max 12.0% Max. Pass
ASTM C123 0.0% ---- 0.5% Max. Pass

REPORT OF SIEVE ANALYSIS

REPORT OF AGGREGATE QUALITIES
Sieve Size
Test Description
LA Abrasion @ 100 Revs
Cleanness Value
Sodium Sulfate Soundness (5 cycles)
Lightw eight Particles [Coal & Lignite]
(Zinc Chloride)
ASTM C117 /
ASTM C136
ASTM C131
ASTM C127
LA Abrasion @ 500 Revs
Clay Lumps & Friable Particles
Specific Gravity (Oven Dry)
Specific Gravity (SSD)
Specific Gravity (Apparent)
Absorption

Page 2 of 2 ends

1176

G E N E R A L E N G I N E E R I N G C O N T R A C T O R Lic. No 1088006 A

Victorville Wellness Center
City of Victorville
General Contractor: Angeles Contractor, Inc.

Rock
1” Rock
Supplier: West Coast Sand & Gravel

Notes:
• SSPWC – No. 3 Rock

1177
Date: 3/10/2022
Material: 1"CR
Plant: FC
Weight % Passing % Passing % Passing
Sieve Size Retained Required Required Sample
Standard Metric
2" 50 mm
1 1/2" 37.5 mm
1" 25 mm 94.0
3/4" 19 mm 66.0
1/2" 12.5 mm
3/
8" 9.5 mm 5.0
#4 4. 75 mm 1.0
#8 2. 36 mm 1.0
#16 1.18 mm
#3
0 600 um
#50 300 um
#100 150 um
#200 75 um 0.0
West Coast not responsible for material segregation during transit after leaving the plant 1178
Work Order Signature Document
EZIQC Contract No.: CA-R8-GB06-123021-ACI
Victorville Wellness Center, phase 1 - supplemental #2
New W
ork Order
102420.02
Modify an Existing Work Order
Work Order Title:

Work Order Number.: Work Order Date:

X
06/13/2022
Contractor Name:

Contact:

Phone:

Contact:

Phone:

Jay Kwon
714.290.7437
Owner Name: City of Victorville
Brian Gengler
760.955.5135
Angeles Contractor Inc.

Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Sourcewell EZIQC Contract No CA-R8-GB06-123021-ACI.

Brief Work Order Description: see attached
X Will not apply:Liquidated Damages Will apply:

Estimated Completion Date:

Estimated Start Date: Time of Performance
Work Order Firm Fixed Price
: $165,785.99
Owner Purchase Order Number:

Approvals
Date DateContractorCity of Victorville

2.00

Page 1 of 1 ends

6/13/2022
Work Order Signature Document
1179

3.00 Detailed Scope of Work
Jay KwonTo: From: Brian Gengler
Angeles Contractor Inc.
783 Phillips Drive
City of Industry, CA 91748
714.290.7437
City of Victorville
14343 Civic Drive
Victorville, CA 92323
760.955.5135
Work Order Number:

June 13, 2022Date Printed:
102420.02
Victorville Wellness Center, phase 1 - supplemental #2Work Order Title:

Brief Scope:

Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work.

PHASE 1 SUPPLEMENTAL
WORK ORDER #102420.02 SCOPE OF WORK:

I. GROUNDWATER TEST AND ANALYSIS WHICH INCLUDE THE FOLLOWING; A. Drilling and installing a 2 inch temporary sample well using Hollow Stem Auger B. Water sampling and laboratory analysis
C. Please refer to Exhibit #1 attachment for Griffin Dewatering, Inc proposal for scope of work, terms and conditions full details
II. DEEP WELL DEWATERING SYSTEM WHICH INCLUDE THE FOLLOWING; A. Furnish labor, material and equipment with detailed scope of work based in Griffin Dewatering, Inc proposal B. Provide generator for 1-month rental cost included in Griffin Dewatering proposal with option for subsequent months rental cost
C. Please refer to Exhibit #2 attachment for Griffin Dewatering, Inc proposal for scope of work, terms and conditions full details
D. Credit back Phase 1 VVWRA Category price proposal item #316 [31231900-0007], #317 [31231900-0013] and #318 [31231900-0016]
III. ATTACHMENTS:

A. Attachment A- Dewatering Plan Submittal
B. Attachment A.1-Dewatering Plan Submittal Response
C. Attachment C-Groundwater Test and Analysis Reports
D. Exhibit #1-NPP Item 31000000-1001 Sample Well, Groundwater Test and Analysis by Griffin E. Exhibit #2-NPP Item 31000000-1002 Deep Well Dewatering System by Griffin F. Exhibit #3-Credit Back Item 316, 317 and 318 from Phase 1 Price Proposal IV. CLARIFICATIONS:

A. Exclude all Phase 2 Work
B. Exclude environmental clean up and disposal of hazadous materials and contaminated water C. Exclude import and export of soils
D. Exclude the Generator fuel cost

Page 1 of 2 ends

6/13/2022
Scope of Work
1180
Detailed Scope of W
ork Continues..

Work Order Title:

Work Order Number: 102420.02
V
ictorville Wellness Center, phase 1 - supplemental #2
E. Exclude treatment of contaminated water if required
F. Exclude Discgarge and NPDES Permit Fees
Subject to the terms and conditions of ezIQC Contract CA-R8-GB06-123021-ACI.

Contractor Date
DateCity of Victorville

Page 2 of 2 ends

6/13/2022
Scope of Work
1181

4.00 Contractor's Price Proposal - Summary
Owner PO #:

Victorville W
ellness Center, phase 1 - supplemental #2
102420.02
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Title:

Re:

June 13, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$165,785.99
-$65,772.73Phase 1 Base Contract Credit-VVWRA Dewatering $231,558.72Phase 1 Deep Well Dewatering System for VVWRA Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$165,785.99
The Percentage of NPP on this Proposal: 137.52%

Page 1 of 1 ends

6/13/2022
Contractor's Price Proposal - Summary
1182
102420.02
Victorville Wellness Center, phase 1 - supplemental #2Title Job Order Re:

Date: 6/13/2022
Contractor's Non-Prepriced Worksheet
$164,148.23 1.00 164,148.23 X Install Quantity: = Install Total :Install Price:

Furnish and Install Deep Well Dewatering System by Griffin Dewatering, Inc.

LS31 00 00 00 1002

ITEMSECTION UOM DESCRIPTION
Factor:X
Line Item Total:=

1.2889
$21
1,570.65
For W
ork Performed with the Contractor's Own Forces:

A.

B.

C.

Direct Labor Costs through Foreman Level
(
Current Prevailing Wage Rate + Published Fringe Benefits) Direct Material Costs (Supported by 3 Quotes)*
Direct Equipment Costs (For Equipment NOT in the CTC)
T
otal Cost for Self-perform NPP W ork Task =
(A+B+C) x Non-Prepriced Work Task Adjustment Factor
*Material Cost Quotes
(Attach quotes from listed suppliers/subcontractors. A Justification Letter must be attached if 3 quotes are not furnished.)

1. 2.
$
$

3. $
H.

For W
ork Performed By Subcontractors:

G. Subcontractor Costs**
(Supported by Quotes) (This Should be the Price Entered into PROGEN) I. T
otal Price for NPP Items being Performed by Subcontractors = G x H Contractor's Non Pre-
Priced Adjustment Factor 1.2889
**Subcontractor Cost Quotes
Convert to Unit Price
(Attach quotes from listed suppliers/subcontractors.

A Justification Letter must be attached if 3 quotes are not furnished.)

1. $3.
$
$

2. Non-Prepriced Worksheet Page 1 of 2
$164,148.23
$211,570.65
Griffin 164,148.23
1183
102420.02
Victorville Wellness Center, phase 1 - supplemental #2Title Job Order Re:

Date: 6/13/2022
Contractor's Non-Prepriced Worksheet
$12,739.00 1.0012,739.00 X Install Quantity: = Install Total :Install Price:

Furnish and Install Temporary Sample Well and Groundwater Laboratory Testing and Analysis by Griffin Dewatering
LS31 00 00 00 1001

ITEMSECTION UOM DESCRIPTION
Factor:X
Line Item Total:=

1.2889
$16,419.30
For Work Performed with the Contractor's Own Forces:

A.

B.

C.

Direct Labor Costs through Foreman Level
(
Current Prevailing Wage Rate + Published Fringe Benefits) Direct Material Costs (Supported by 3 Quotes)*
Direct Equipment Costs (For Equipment NOT in the CTC)
T
otal Cost for Self-perform NPP W ork Task =
(A+B+C) x Non-Prepriced Work Task Adjustment Factor
*Material Cost Quotes
(Attach quotes from listed suppliers/subcontractors. A Justification Letter must be attached if 3 quotes are not furnished.)

1. 2.
$
$

3. $
H.

For W
ork Performed By Subcontractors:

G. Subcontractor Costs**
(Supported by Quotes) (This Should be the Price Entered into PROGEN) I. T
otal Price for NPP Items being Performed by Subcontractors = G x H Contractor's Non Pre-
Priced Adjustment Factor 1.2889
**Subcontractor Cost Quotes
Convert to Unit Price
(Attach quotes from listed suppliers/subcontractors.

A Justification Letter must be attached if 3 quotes are not furnished.)

1. $3.
$
$

2. Non-Prepriced Worksheet Page 2 of 2
$12,739.00
$16,419.30
Griffin 16,419.30
1184

5.00 Contractor's Price Proposal - Detail
Victorville W
ellness Center, phase 1 - supplemental #2
102420.02
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

June 13, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$165,785.99
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.

Phase 1 Base Contract Credit-VVWRA Dewatering
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal.
1 -$715.62
EA
Installation =x x -715.62
FactorUnit PriceQuantity Total

1.00 1.1000-650.56
Bond Fees Credit for VVWRA
Dewatering-PHASE 1 BASE CONTRACT PROPOSAL ITE #316, 317 & 318 [$65,055.87 x 1% = $650.56
31 23 19 00 0007 >500' To 1,000' In Length Well Point System Delivery, Installation And Removal2 -$22,177.89LF Installation =x x -22,177.89
FactorUnit PriceQuantity Total

49.28 1.2432-362.00
CREDIT
BACK FROM PHASE 1 BASE CONTRACT PROPOSAL ITEM #316]-dewatering delivery, installation and removal [NOTE: TASK ITEM NOT APPLICABLE PER SITE REQUIREMENTS 31 23 19 00 0013 >500' To 1,000' In Length Well Point System Rental (LF x Days = Quantity)3 -$12,016.03LFD Installation =x x -12,016.03
FactorUnit PriceQuantity Total

0.89 1.2432-10,860.00
CREDIT
BACK FROM PHASE 1 BASE CONTRACT PROPOSAL ITEM #317]-dewatering rental 362' x 30 days [NOTE: TASK ITEM NOT APPLICABLE PER SITE REQUIREMENTS
31 23 19 00 0016 Operation Costs4 -$30,863.19HR
Installation =x x -30,863.19
FactorUnit PriceQuantity Total
103.44 1.2432-240.00
CREDIT
BACK FROM PHASE 1 BASE CONTRACT PROPOSAL ITEM #318]-dewatering operation cost 30 days x 8 hrs [NOTE: TASK ITEM NOT APPLICABLE PER SITE REQUIREMENTS] -$65,772.73Subtotal for Phase 1 Base Contract Credit-VVWRA Dewatering Phase 1 Deep Well Dewatering System for VVWRA
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal.
5 $3,568.77
EA
Installation =x x 3,568.77
FactorUnit PriceQuantity Total

1.00 1.1000 3,244.34
Supplemental # 2 Bond Fees [$162,217.22 x 2%]

Page 1 of 2 ends

6/13/2022
Contractor's Price Proposal - Detail
1185
Contractor's Price Proposal - Detail Continues..

Work Order Title:

Work Order Number: 102420.02
V
ictorville Wellness Center, phase 1 - supplemental #2
Phase 1 Deep W
ell Dewatering System for VVWRA
31 00 00 00 1001 Furnish and Install T emporary Sample Well and Groundwater Laboratory Testing and Analysis by Griffin Dewatering
6 $16,419.30LS
Installation =x x 16,419.30
FactorUnit PriceQuantity T
otal
NPP
12,739.00 1.2889 1.00
NPP
item for Groundwater Testing and Analysis Services provided by Griffin Dewatering , works include installation of 2 inch temporary sample well using Hollow Stem auger, water sampling and laboratory analysis, all scope is based on Griffin Dewatering quote dated 5/17/22 [NOTE: THERE ARE NO CTC TASK
ITEM AVAILABLE FOR THIS GROUNDWATER TESTING & ANALYSIS] 31 00 00 00 1002 Furnish and Install Deep Well Dewatering System by Grif fin Dewatering, Inc.7 $211,570.65LS Installation =x x 21
1,570.65
FactorUnit PriceQuantity T
otal
NPP
164,148.23 1.2889 1.00
NPP
Item for Deep Well Dewatering System per Griffin quote GD-32884 dated May 17, 2022 [NOTE This cost exclude generator fuel cost and NPDES Permit Fees] [NOTE:

THERE ARE NO CTC TASK ITEM AVAILABLE FOR
THIS DEEP WELL DEWATERING SYSTEM]
$231,558.72Subtotal for Phase 1 Deep Well Dewatering System for VVWRA Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$165,785.99
The Percentage of NPP
on this Proposal: 137.52%

Page 2 of 2 ends

6/13/2022
Contractor's Price Proposal - Detail
1186
Subcontractor Listing
102420.02
Victorville W
ellness Center, phase 1 - supplemental #2
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

June 13, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$165,785.99
%DutiesName of Contractor Amount
Griffin Dewatering LLC Deep Well Dewatering System 106.71$176,914.00

6.00

Page 1 of 1 ends

6/13/2022
Subcontractor Listing
1187
Initials: _______
May 17, 2022 GD-32884
Angeles Contractor
783 Phillips Drive
City of Industry, CALIFORNIA 91748-1147
Attn: Jay Kwon
Phone: 626-923-3800
Email: [email protected]
Re: Victorville Wellness Center
Dear Jay,
Thank you for contacting Griffin. We are pleased to submit our proposal for the above referenced project. This proposal outlines the proposed equipment and materials, price of the system, and any Contractor assistance that will be needed.

Project Information________________________________________________________________________ The site is located in Victorville, CA and consists of 350’ of pipeline installation.

Excavations for the work will vary between EL 2691-2700. The groundwater is at EL 2699, and the soils consist of well and poorly graded sands with clayey sand. If the granular soils are not dewatered prior to construction then the excavations will flood and become unstable and unsafe.

The assumed project parameters can be summarized as follows:

Area STA Excavation
Depth/
Elevation
Excavation
Method and
Dimensions
Surface
EL
SWL
EL
Amount
of Water
Relevant
Boring
Total
Footage
(LF)
VVWRA
pipeline
replacement
1+00
to
4+47

8.5-14’ bgs/
EL 2693-
2694.5
Trenches EL 2702
to 2708
2699 4.5-6’ All
Borings
350
*bgs – Below Ground Surface. Pipe excavations include approximately 1’ of over-excavation. ***Listed static water level is based on the water table elevation shown on sheet no. 3 in the referenced precise grading plans. Actual encountered groundwater elevation may vary.

Our proposal is based on the information provided, specifically:
• Geotechnical Investigation Report provided by Merrell Engineering Company, Inc. (12/11/2020; M.J. Project No. 2102.041.500)
• Infiltration Report provided by Merrell Engineering Company, Inc. (11/09/2020; M.J. Project No. 2102.041.500) • Precise grading plans provided by the City of Victorville Engineering Department (01/03/2022; WDID No. 6B36C396947)
• Wet utility plans provided by Victorville Engineering Department (10/08/2021; WDID No. 6B36W00481) • UNE interceptor plans (addendum 4) provided by Victor Valley Wastewater Reclamation Authority (11/2013, Project No. 135-09065-11001)10th street sewer lift station plans provided by the City of Victorville Engineering Department (10/06/2015; Drawing No. SP-735)
1188
Re: Victorville Wellness Center

Initials: _______

Scope of Work_____________________________________________________________________________

Based on the above information, Griffin will provide and install the following scope of services:
• Type of proposed System: A deep well dewatering system along one side of the pipeline trench. • Installation Method: Wells will be drilled up to 40’ deep, utilizing Griffin’s bucket auger drilling rig to drill up to a 30” diameter borehole. Deep wells come complete with screen, casing, riser pipe and a select filter pack. • Pumping System: Submersible turbine pumps within each well. Pumping system comes complete with a check valve, butterfly valve, swing hose, control panel and motor cable to within 10’ of the borehole at the surface. • Power Requirement: Minimum, 460V, 3Ø, 70amps
• Discharge: Up to 400LF of discharge pipe/hose routed to a mutually agreed upon location. • Removal & Demobilization: Upon completion of dewatering, Griffin proposes to remobilize to the site and remove all Griffin materials and return them to the nearest Griffin yard.

Assumptions:
• It is assumed that all of the wells can be completed under one mobilization. • Griffin is assuming a static water level (SWL) of EL 2699 across the project area. • Upon completion of a series of wells, Griffin recommends performing a pump test to verify Griffin’s assumptions on the aquifers characteristics and system performance. • Griffin is assuming a permeability range of 0.1-0.3 ft/min for this site. • It is assumed that water bearing sands will be encountered to a depth of 40ft in the areas requiring dewatering. • No guarantees are made regarding the adequacy of this system. Griffin will share our full dewatering plan once a commitment is made.
• Subcontractor has not independently verified subsurface conditions and is relying on the continuity and accuracy of the geotechnical report

Attached please find the following:
• Attachment A – Pricing
• Attachment B – Contractor’s Obligations
• Attachment C – Terms & Conditions

Griffin Dewatering thanks you for the opportunity to submit this proposal and we look forward to the possibility of working with you on this project. If you have any questions or concerns or would like to discuss this project in more detail, please do not hesitate to contact me. I am frequently in the area and would be happy to schedule a time to meet at your office to review the work plan in greater detail. I can always be reached at 951-258-9430.

Sincerely,

Duke Wilson

This proposal for stated services above, along with the attached terms and conditions and any exclusions or exceptions indicated is acceptable. Griffin Dewatering is hereby authorized to perform the stated scope of work as priced.

Accepted this day of __ , 20___ Signature: ___

Name: Title: Company:

1189
Re: Victorville Wellness Center

Initials: _______

Attachment A – Pricing

Base Contract: Per Unit Price Unit Quantity Total
Pre-Construction Services $ 8,150.00 LS 1 $ 8,150.00 Mobilization $ 12,502.00 LS 1 $ 12,502.00 Furnish & Installation of Deepwell System $ 118,998.00 LS 1 $ 118,998.00 Monthly Rental $ 3,165.00 Month 0 $ - Removal & Demobilization $ 7,350.00 LS 1 $ 7,350.00

Base Contract Total: $ 147,000.00

Griffin can also provide generators to power the dewatering system at the following rates. The generators would consist of the following items:
• 1 Primary Generator (125KVA) Triple Shift – Estimated fuel consumption at 4.5- 6.8 GPH – Fuel not included
• 1 Standby Generator (125 KVA) Single Shift
• 1 Auto Transfer Switch
• 1 Automatic overflow/turn-on float panel alarm (in the case water treatment tanks overflow) • 1 (600 gallon) double-wall fuel tank
• 3 Spill berms
The pricing for the above-mentioned generators and associated items is:
o Deliver, set-up, remove + 1st month rent at $10,520
o Subsequent months at $9,700
o Engine Service once per week at $575
Engine service will be provided by a Griffin mechanic, who is technically trained on our automated pumping systems – shutting down and proper starting up after service is completed is critical.

All local, state, and federal taxes and fees are additional to any pricing shown herein. + Tax
+ Tax [8.5%] = $11,414.20
+ Tax [8.5%] = $10,524.50
NPP Cost Breakdown:

1. Base Contract = $147,000.00

2. Generator 1- Month Rental = $11,414.20

3. Dewatering 1-Month Rental = $3,434.03

4. Engine Service 4 weeks = $2,300.00
NPP ITEM TOTAL = $164,148.23
1190
Re: Victorville Wellness Center

Initials: _______

Attachment B - Contractor Obligations

1. All earth work, including but not limited to, all necessary access/egress accommodating of two-wheel drive construction, line, grade, level right-of-way and work areas.

2. Equipment pads which provide a minimum of 5 feet of reverse head for the drilling of wells.

3. If required, any scaffolding, bracing, mats, plates and/or benches to facilitate the installation and service of the dewateri ng equipment, construction and maintenance of trenches, berms, dikes, ditches, excavations and all other reasonable and necessary site preparation and protection of work site.

4. Provide any required waterproofing / sealing of well penetrations through foundations, cutting, coring, or sleeving.

5. Performance of a site survey, which physically indicates by survey stakes the location of all well sites and other equipment and materials to be installed in accordance with this agreement.

6. Removal of surface water, ice, snow and any unusual or unnatural underground and surface obstructions, including concrete.

7. Marking and any necessary relocation or protection of all on-site and surrounding utilities and service lines, above and beneath the ground. Subcontractor will obtain all governmental required utility notification/identification reports from the local “utility locating service”. However, Contractor shall provide final verification that all potential underground facilities, of any kin d, have been identified and that the location provided by Contractor fo r Subcontractor’s work will not conflict with any such facilities.

8. Provide and maintain as current all permits, licenses (other than Subcontractor’s trade licenses), approvals, fees, and authorizations required for the completion of Subcontractor’s work, including but not limited to discharge, drilling, and abandonment permits.

9. Provide jobsite security, and all required pedestrian and traffic control, and protection.

10. Provide adequate control of water resulting from or accumulating as perched or trapped wa ter, overtopping water, runoff, seepage, surface water, interface water, and water in any other form, or from a source, not collected by the equipment.

11. Provide all required: monitoring, sampling, testing, containment, treatment, and disposal of discharge water including, if necessary, containment, cleanup (settling and/or turbidity curtains, etc.), and set the discharge so as to not recharge the dewatered areas.

12. Provide protection of adjacent property from, and containment, treatment, and disposal of: all drilling cuttings, excavation spoil, and spent drilling and jetting fluids and all other fluids which are the byproduct of the work. Provide adequate protection of Subcontractor equipment from freezing and flooding conditions. Contractor will be responsib le for all expenses resulting from loss or damage to Subcontractor’s equipment not caused by Subcontractor or due to standard wear and tear, including the costs of replacement removal, return, and repair. Contractor is responsible for heat tracing or insulation of any kind.

13. Provide adequate and readily accessible water source within 100lf of the work locations, including water meter and/or backflow preventer if required, and/or sufficient water truck support, so as not to impede work progress.

14. Provide suitable electrical power and stand-by power adequate for the equipment.

15. Provide all personnel for operation and maintenance (including start -up and testing) of all dewatering and/or treatment equipment installed including manpower, fuel, electricity, lubrican ts, fuel tanks, secondary containment, standby power, settlement tanks, all system / site monitoring, removal of waste, changing of filters, flocculent, filter media, additive chemicals, etc. when needed, and all system modifications and/or changes.

16. Provide a suitable excavator, front -end loader, and/or crane, if required, which are manned, fueled, and maintained for Subcontractor’s use during all unloading, installations, repairs, modifications, removals, and loading.

17. Provide removal, cleaning, and return of Subcontractors equipment upon completion of usage, including the removal/treatment/disposal of any solids/liquids from any primary or secondary containment vessels and any tanks. If Subcontractor has agreed to perform these activities, then Contractor shall provide on -site all necessary facilities/materials, including any disposal, to accomplish these activities.

18. Provide for restoration of the work site upon project completion, including the abandonment of wells, wellpoints, piezometers, monitoring wells, or other holes, and any remedial or restoration repairs / patching to concrete, asphalt, or other surfaces and grouting.

19. Provide all required sound barriers, walls, or other visual and sound isolation/noise abatement measures.

20. Provide personnel, equipment and materials for any required dust control and access maintenance resulting from any activities of Subcontractor or its Subcontractors/suppliers.

21. Provide all “as-built” drawings and any required review/signature/stamp of a Professional Engineer.

22. Estimate based upon - Normal Working Hours (7:00am – 3:30pm).

23. Contractor shall notify Subcontractor in writing when the Dewatering shall be terminated. 1191
Re: Victorville Wellness Center

Initials: _______

Attachment C - Griffin Dewatering and Affiliated Companies Standard Terms and Conditions A. This agreement, and any offer by any Griffin Company (Griffin) are subject to the following terms and conditions. The terms, conditions, and other provisions of this Agreement constitute the entire agreement between the parties. It is expressly understood it can be modified only in a writing signed by both parties. This Agreement is for the benefit of the named parties only and does not confer a benefit upon any other named or unnamed third party. Griffin objects to and rejects any additional or different terms proposed by Purchaser.

B. Unless stated in the Proposal, Griffin is not obligated to satisfy any specific contract specification and will only assume t he obligation to supply the equipment and perform the work stated herein. Any additional equipment and/or services required can be provided by Griffin, if mutually agreed to or will be the responsibility of others. No liabilities, warranties, or guaran tees, beyond those stated herein, are assumed by Griffin. This nature and scope of services to be provided pursuant to this Agreement and the pricing contained herein are based on the site information referenced in the Proposal. Griffin has not independently verified the conditions affecting the site and Griffin is solely relying on the accuracy and complet eness of the information referenced in the Proposal. Purchaser acknowledges that, if conditions are materially different than those shown or presente d to Griffin in the site information furnished by Purchaser, Griffin shall be entitled to an equitable adjustment in the Agreement price and schedule.

C. The pricing stated in this Agreement will be honored by Griffin for only 30 days from the date the Proposal is submitted to Purchaser for acceptance, unless the parties agree in writing to extend the 30-day period.

D. Pricing is based on Griffin’s regular rate for labor and normally scheduled business hours 7:00 AM– 3:30 PM Monday through Friday. It is the responsibility of the Purchaser to determine whether federal, state, or local prevailing wage requirements apply and to notify Griffin if prevailing wages apply. If it is later determined that prevailing wages apply, and Griffin was not previously notified by Purchaser, Purchaser agrees to pay the prevailing wage from that point forward, as well as a retroactive payment adjustment to bring previously paid amounts in line with prevailing wages.

E. Terms of payment for Services are net 30 days. No retainage shall be withheld from any payments due Griffin unless authorized by Griffin in the Price section of this Agreement.

F. All scheduling shall be mutually agreed to, prior to the commencement of the work. Griffin shall be permitted to perform its work in a continual and uninterrupted manner. The Purchaser shall be responsible for all reasonable costs and additional charges associated with any delays or other interferences or impacts (“Delays”) to Griffin’s work to the extent Griffin is not the cause thereof.

G. Griffin shall not accept, or be bound by, any liquidated, indirect, and /or consequential damage.

H. To the fullest extent permitted by law, the total aggregate liability of Griffin (and its related corporations and employees) to Purchaser and third parties granted reliance is limited to Griffin's fee, for any and all injuries, damages, claims, losses, or expenses (including attorney and expert fees) arising out of Griffin's services or this agreement. This limitation shall apply regardless of available insurance coverage, cause(s) or the theory of liability, including negligence, indemnity, or other recovery.

I. Griffin shall provide at its own expense and shall maintain during the period during which any services are furnished pursuant to this Agreement its standard liability and workers compensation insurance coverage. A Certificate of Insurance will be furnished upon request. This Certificate of Insurance shall not expand Griffin’s duty to insure beyond the scope and amount of coverage specifically stated herein. Griffin shall be reimbursed for the costs of any additional coverage requested in excess of its existing policy that Griffin agrees to obtain. Griffin shall not be liable for or required to provide any bond, or costs thereof.

J. Purchaser shall indemnify and hold harmless Griffin, its parents, subsidiaries, affiliates, agents, officers and employees fr om any and all claims, demands, causes of action, damages, costs, expenses, actual attorneys’ fees, losses or liabilities, in la w or in equity, of every kind and nature whatsoever arising out of or in connection with Griffin’s work performed and/or contemplated under this Agreement for, but not limited to, bodily injury, sickness, disease or death, and damage to property of another, including by not limited to the loss of use resulting there from. (All collectively referred to as “Claims”) This obligation specifically includes, but is not limited to, the following Claims:
• Claims arising out of subsidence and/or settlement at the Project site or adjacent areas; • Claims arising out of the presence of any contaminated, hazardous, or toxic matter located on or near the Project site; • Claims for damage to water wells;
• Claims arising out of the failure to treat chemical or other constituents (contaminants) identified in water quality samples for treatment prior to discharge or disposal.
• Claims arising out of the operation or use of any Equipment supplied by Griffin pursuant to this Agreement. 1192
Re: Victorville Wellness Center

Initials: _______

• Claims arising out of Construction Defects occurring after Griffin’s Equipment is removed Purchaser, however, shall not be obligated under this Agreement to indemnify Griffin for Claims arising from the sole negligence or willful misconduct of Griffin. Purchaser further agrees to assume all costs and liability associated with the handling and disposal of any contaminated, hazardous, or toxic matter encountered during the course of the Project.

K. Any notices required under the terms and conditions of this Agreement shall be delivered to Griffin at the Griffin office tha t originated this Agreement and shall not be effective until received by Griffin as required herein.

L. This Agreement will be governed by the laws of the state of Texas without regard to its choice of law provisions. Griffin and Buyer agree that any litigation involving this Contract wi ll be brought exclusively in federal or state courts located in Harris County, Texas. each party hereby consents to personal jurisdiction in any federal or state court within Houston, Harris county, Texas and irrevocably waives, to the fullest extent permitted by applicable law and the laws of the state of Texas, any claim or objection that it may now or hereafter have, that venue or personal jurisdiction is not proper with respect to any such dispu te.

In the event of litigation between the parties to this Agreement to enforce the rights under this section, reasonable attorneys’ fees and costs shall be awarded to the prevailing party.

M. Unless otherwise mutually agreed herein, Griffin shall not supply or pay operators required to operate the equipment during the Rental Period. All operators shall be competent. If Purchaser assumes the responsibility for the operation of the Equipment, Purchaser acknowledges that it is solely responsible for operation of the Equipment, assumes all risks inherent in the operation and use of the Equipment, and agrees to take all necessary precaution to protect all persons and property from injury or damage while Purchaser is in possession of the Equipment. Griffin includes the cost of up to 2 regular time work hours to train Purchaser personnel in operation/maintenance of Griffin equipment.

N. Unless otherwise stated herein, the price assumes that all work will be performed under maximum PPE Level D; no exposure to, or handling of, any contaminated, toxic, or controlled substances has been included; and any site specific health and safety plans, and their implementation (monitoring, reporting, PPE materials, decontamination/cleanup, disposal, etc.), shall be by others. Purchaser shall provide and pay for any special or site-specific training (environmental or otherwise) required for work on the project.

O. All Griffin requirements for Purchaser supplied materials, manpower, electric/fuel, equipment, services, etc. are estimates only, and Griffin is not responsible if quantities needed exceed those estimates.

P. All drilled and/or jetted holes or excavations shall be to the depth stated in the Scope of Work or terminated due to refusal , whichever comes first and as determined by Griffin
Q. Purchaser shall pay Griffin rental for the Equipment for the entire rental period in accordance with the following:
a). Minimum Monthly Rental Periods shall not be subject to any deductions. b). The Rental Period commence upon equipment arriving on site and will terminate upon the return of all equipm ent to the facility designated by Griffin for return, freight prepaid by Purchaser.

R. Griffin shall not be liable for any loss, damage or expense resulting from delay or failure in the performance of Griffin’s obligations hereunder if such delay or failure is due to acts of God or the public enemy, strikes, labor troubles, fire, explosions, riots, war, governmental orders or restrictions, shortages of materials or labor, delay in transportation, theft, accidents o r any other cause which is beyond Griffin’s reasonable control. Upon the occurrence of any such event preventing the Griffin from performing all of its then outstanding contracts, the Griffin shall then be entitled to perform such of its contracts as it may select and shall incur no liability to the Purchaser by reason of performing contracts other than this agreement. The Griffin’s total liability for damages related to the performance of or failure to perform this agreement shall be limited to the amount of th e contract price. IN NO EVENT SHALL TH E GRIFFIN BE LIABLE FOR LOSS OF PROFITS BY REASON OF PLANT

SHUTDOWN, NON - OPERATION OR INCREASE IN EXPENSE OF OPERATION OF OTHER EQUIPMENT OR FACILITIES OR FOR ANY SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES.

1193
May 10, 2022
Angeles Contractor, Inc.

Victorville Wellness Center
Subject: Installation of temporary sample well and Laboratory Testing Attention: Mr. Jay Kwon
In efforts to identify groundwater quality constituents, Griffin hereby presents this proposal for the construction of a temporary sample well, followed by water sampling and laboratory analysis.

Processes to Comply with the Above Requirements:

1. Obtain water sample by installing drilling and i nstalling a 2 inch temporary sample well using a Hollow Stem auger.
$ 7,839.00

2. Obtain laboratory analysis.
$ 4,/g101300.00
Upon receiving groundwater test results, Griffin can provide a water treatment proposal (if needed).

Duke Wilson
Business Development
Griffin Dewatering
7000 Jurupa Ave.

Riverside, CA 92504
Cell:: (951) 259-9430
E-Mail: [email protected]
www.griffindewatering.com
This proposal is for the stated services above. Griffin Dewatering is hereby authorized to perform the stated scope of work as priced.

Accepted this day of:

By:

Title:

Company:

Contractor Obligations
5/19/2022 This scope of work is
acknowledged by ACI and ACI will be
responsible for the payment once it is
completed. Please proceed with the
schedule for 5/23/2022.

ACI will issue an ACI Subcontractoc
Change order(SCO) which will take a
few days in addition to SCA
(Subcontractor Agreement).

Jay Kwon
Jay Kwon
Senior Project Manager
Angeles Contractor, Inc.
1194
2 1. All earth work, including but not limited to, a ll necessary access/egress accommodating of two- wheel drive construction, line, grade, level right-of-way and work areas.

2. Equipment pads which provide a minimum of 5 feet of reverse head for the drilling of wells.

3. If required, any scaffolding, bracing, mats, plates and/or benches to facilitate the installation and service of the dewatering equipment, constructi on and maintenance of trenches, berms, dikes, ditches, excavations and all other reasonable and necessary site preparation and protection of work site.

4. Provide any required waterproofing / sealing of well penetrations through foundations, cutting, coring, or sleeving.

5. Performance of a site survey, which physically indicates by survey stakes the location of all well sites and other equipment and materials to be installed in accordance with this agreement.

6. Removal of surface water, ice, snow and a ny unusual or unnatural underground and surface obstructions, including concrete.

7. Marking and any necessary relocation or protection of all on-site and surrounding utilities and service lines, above and beneath the ground. Subcontractor will obtain all governmental required utility notification/identifi cation reports from the local “utility locating service”. However, Contractor shall provide final verification that a ll potential underground facilities, of any kind, have been identified and that the location pro vided by Contractor for Subcontractor’s work will not conflict with any such facilities.

8. Provide and maintain as current all permits, li censes (other than Subcontractor’s trade licenses), approvals, fees, and authorizations required for the completion of Subcontractor’s work, including but not limited to discharge, drilling, and abandonment permits.

9. Provide jobsite security, and all required pedestrian and traffic control, and protection.

10. Provide adequate control of water resulting from or accumulating as perched or trapped water, overtopping water, runoff, seepage, surface water, interface water, and water in any other form, or from a source, not collected by the equipment.

11. Provide all required: monitoring, sampling, testi ng, containment, treatment, and disposal of discharge water including, if necess ary, containment, cleanup (settling and/or turbidity curtains, etc.), and set the discharge so as to not recharge the dewatered areas.

12. Provide protection of adjacent pro perty from, and containment, trea tment, and disposal of: all drilling cuttings, excavation spoil, and spent drilling and jetting fluids and all other fluids which are the byproduct of the work. Pro vide adequate protection of Subcontractor equipment from freezing and flooding conditions. Contractor will be responsible fo r all expenses resulting from loss or damage to Subcontractor’s equipment not caused by Subcontractor or due to stan dard wear and tear, including the costs of replace ment removal, return, and repair. Contractor is responsible for heat tracing or insulation of any kind.

13. Provide adequate and readily accessible water source within 100lf of the work locations, including water meter and/or backflow preventer if required, a nd/or sufficient water truck support, so as not to impede work progress.

14. Provide suitable electrical power and stand-by power adequate for the equipment.

15. Provide all personnel for operati on and maintenance (including start-up and testing) of all dewatering and/or treatment equipment installed including manpower, fuel, electricity, 1195
3 lubricants, fuel tanks, secondary containment, standby power, settlement tanks, all system / site monitoring, removal of waste, changing of filters, flocculent, filter media, additive chemicals, etc. when needed, and all system modifications and/or changes.

16. Provide a suitable excavator, front-end loader, and/or crane, if r equired, which are manned, fueled, and maintained for Subcontractor’s use duri ng all unloading, installations, repairs, modifications, removals, and loading.

17. Provide removal, cleaning, and return of Sub contractors equipment upon completion of usage, including the removal/treatment/disposal of any so lids/liquids from any primary or secondary containment vessels and any tanks. If Subcontractor has agreed to perform these activities, then Contractor shall provide on-site al l necessary facilities/materials, including any disposal, to accomplish these activities.

18. Provide for restoration of the work site upon pro ject completion, including the abandonment of wells, wellpoints, piezometers, monitoring wells, or other holes, and any remedial or restoration repairs / patching to concrete, asphalt, or other surfaces and grouting.

19. Provide all required sound barriers , walls, or other visual and sound isolation/noise abatement measures.

20. Provide personnel, equipment and materials for any required dust control and access maintenance resulting from any activities of Subcontractor or its Subcontractors/suppliers.

21. Provide all “as-built” drawings and any requi red review/signature/stamp of a Professional Engineer.

22. Estimate based upon - Normal Working Hours (7:00am – 3:30pm).

23. Contractor shall notify Subcontractor in writing when the Dewatering shall be terminated. 1196
4 Griffin Dewatering and Affiliated Companies Standard Terms and Conditions

A. This agreement, and any offer by any Griffin Company (Griffin) are subject to the following terms and conditions. The terms, conditions, and other provisions of this Agreement constitute the entire agreement between the parties. It is expressly understood it can be modified only in a writing signed by both parties. This Agreement is for the benefit of the named parties only and does not confer a benefit upon any other named or unnamed third party. Griffin objects to and rejects any additional or different terms proposed by Purchaser.

B. Unless stated in the Proposal, Griffin is not obligated to satisfy any specific contract specification and will only assume the obligation to supply the equipment and perform the work stated herein.

Any additional equipment and/or services required can be provided by Griffin, if mutually agreed to or will be the responsibility of others. No liabilities, warranties, or guarantees, beyond those stated herein, are assumed by Griffin. This nature and scope of services to be provided pursuant to this Agreement and the pricing contained herein are based on the site information referenced in the Proposal. Griffin has not independently verified the conditions affecting the site and Griffin is solely relying on the accuracy and completeness of the information referenced in the Proposal.

Purchaser acknowledges that, if conditions are materi ally different than those shown or presented to Griffin in the site information furnished by Purchaser, Griffin shall be entitled to an equitable adjustment in the Agreement price and schedule.

C. The pricing stated in this Agreement will be honored by Griffin for only 30 days from the date the Proposal is submitted to Purchaser for acceptance, unless the pa rties agree in writing to extend the 30-day period.

D. Pricing is based on Griffin’s regular rate for labor and normally schedul ed business hours 7:00 AM– 3:30 PM Monday through Friday. It is the responsibili ty of the Purchaser to determine whether federal, state, or local prevailing wage r equirements apply and to notify Griffin if prevailing wages apply. If it is later determined that prevailing wages apply, and Griffin was not previously notified by Purchaser, Purchaser agrees to pay the prevaili ng wage from that point forward, as well as a retroactive payment adjustment to bring p reviously paid amounts in line with prevailing wages.

E. Terms of payment for Services are net 30 days. No retainage shall be withheld from any payments due Griffin unless authorized by Griffin in the Price section of this Agreement.

F. All scheduling shall be mutually agreed to, prior to the comme ncement of the work. Griffin shall be permitted to perform its work in a continual and uninterrupted man ner. The Purchaser shall be responsible for all reasonable costs and additional charges associated with any delays or other interferences or impacts (“Delays”) to Griffin’s work to the extent Griffin is not the cause thereof.

G. Griffin shall not accept, or be bound by, any liquidated, indirect, and /or consequential damage.

H. To the fullest extent permitted by law, the total aggregate liability of Griffin (and its related corporations and employees) to Purchaser and third parties granted reliance is limited to Griffin's fee, for any
and all injuries, damages, claims, lo sses, or expenses (inclu ding attorney and expert fees) arising out of Griffin's services or this agreement. This limitation shall apply regardless of available insurance coverage, cause(s) or the theory of liability, including negligence, indemnity, or other recovery.
1197
5 I. Griffin shall provide at its own expense and shall maintain during the period during which any services are furnished pursuant to this Agreement its standard liability and workers compensation insurance coverage. A Certificate of Insurance will be furnished upon request. This Certificate of Insurance shall not expand Griffin’s duty to i nsure beyond the scope and amount of coverage specifically stated herein. Griffin shall be rei mbursed for the costs of any additional coverage requested in excess of its existing po licy that Griffin agrees to obtain. Griffin shall not be liable for or required to provide any bond, or costs thereof.

J. Purchaser shall indemnify and hold harmless Gri ffin, its parents, subsidi aries, affiliates, agents, officers and employees from any and all clai ms, demands, causes of action, damages, costs, expenses, actual attorneys’ fees, losses or liabilities, in law or in equity, of every kind and nature whatsoever arising out of or in connection wi th Griffin’s work performed and/or contemplated under this Agreement for, but not limited to, bodily injury, sickness, disease or death, and damage to property of another, including by not limited to the loss of use resulting there from. (All collectively referred to as “Claims”) This obligation specifically includes, but is not limited to, the following Claims:
/g120 Claims arising out of subsidence and/or settlement at the Project site or adjacent areas; /g120 Claims arising out of the presence of any contaminated, hazardous, or toxic matter located on or near the Project site;
/g120 Claims for damage to water wells;
/g120 Claims arising out of the failure to trea t chemical or other constituents (contaminants) identified in water quality samples for treatment prior to discharge or disposal. /g120 Claims arising out of the operation or u se of any Equipment supplied by Griffin pursuant to this Agreement.
/g120 Claims arising out of Construction Defects occurring after Griffin’s Equipment is removed Purchaser, however, shall not be obli gated under this Agreement to i ndemnify Griffin for Claims arising from the sole negligence or willful misconduct of Griffin. Purchaser further agrees to assume all costs and liability associated with the handling and disposa l of any contaminated, hazardous, or toxic matter encountered during the course of the Project.

K. Any notices required under the terms and conditions of this Agreement shall be delivered to Griffin at the Griffin office that originated this Agreement and shall not be effective until received by Griffin as required herein.

L. This Agreement will be governed by the laws of the state of Texas without regard to its choice of law provisions. Griffin and Buyer agree that any litigation involvin g this Contract will be brought exclusively in federal or state courts located in Harris County, Texas. each party hereby consents to personal jurisdiction in any federal or state court within Housto n, Harris county, Texas and irrevocably waives, to the fullest extent permitted by applicable law and the laws of the state of Texas, any claim or objection that it may now or hereafter have, that venue or personal jurisdiction is not proper with respect to any such dispute. In the event of litigation between the parties to this Agreement to enforce the rights under this section, reasonable attorneys’ fees and costs shall be awarded to the prevailing party.
1198
6 M. Unless otherwise mutually agreed herein, Griffin shall not supply or pay operators required to operate the equipment during the Rental Period. All operators shall be competent. If Purchaser assumes the responsibility for the operation of the
Equipment, Purchaser acknowledges that it is solely responsible for operation of the Equipment, assumes all risks inherent in the operation and us e of the Equipment, an d agrees to take all necessary precaution to protect all persons and property from injury or damage while Purchaser is in possession of the Equipment. Griffin includes the cost of up to 2 regular time work hours to train Purchaser personnel in operation/maintenance of Griffin equipment.

N. Unless otherwise stated herein, the price assumes that all work will be performed under maximum PPE Level D; no exposure to, or handlin g of, any contaminated, toxic, or controlled substances has been included; and any site speci fic health and safety plans, and their implementation (monitoring, reporting, PPE materials, decontamination/cleanup, disposal, etc.), shall be by others. Purchaser shall provide and pay for any special or site-specific training (environmental or otherwise) required for work on the project.

O. All Griffin requirements for Purchaser supplied materi als, manpower, electric/fuel, equipment, services, etc. are estimates only, and Griffin is not responsible if quantities needed exceed those estimates.

P. All drilled and/or jetted holes or excavations shall be to the depth stated in the Scope of Work or terminated due to refusal, whichever comes first and as determined by Griffin Q. Purchaser shall pay Griffin rental fo r the Equipment for the enti re rental period in accordance with the following:
a). Minimum Monthly Rental Periods shall not be subject to any deductions. b). The Rental Period commence upon equipment arriving on site and will terminate upon the return of all equipment to the fac ility designated by Griffin for return, freight prepaid by Purchaser.

R. Griffin shall not be liable for any loss, damage or expense resulting from delay or failure in the performance of Griffin’s obligations hereunder if such delay or failure is due to acts of God or the public enemy, strikes, labor troubles, fire, explosi ons, riots, war, governmental orders or restrictions, shortages of materials or labor, delay in transportation, theft, accidents or any other cause which is beyond Griffin’s reasonable control. Upon the occurrence of any such event preventing the Griffin from performing all of its then outstanding contracts, the Griffin shall then be entitled to perform such of its contracts as it may select and shall in cur no liability to the Purchaser by reason of performing contracts other than this agreement. The Griffin’s total liability for damages related to the performance of or fail ure to perform this agreement shall be limited to the amount of the contract pric e. IN NO EVENT SHALL THE GRIFFIN BE LIABLE FOR LOSS OF

PROFITS BY REASON OF PLANT SH UTDOWN, NON- OPERATION OR I NCREASE IN EXPENSE OF

OPERATION OF OTHER EQUIPMENT OR FACILITIES OR FOR ANY SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES.

1199

Griffin Dewatering, LLC

Victorville Wellness Center

Victorville, CA

General Contractor:

Angeles Contractor

05/19/2022

Dewatering Plan Submittal

1200

2 Victorville Wellness Center, Victorville, CA
Table of Contents

1.0 Introduction ................................................................................................ 3

2.0 Project Parameters ...................................................................................... 4

2.1 Geology and Groundwater ............................................................................................. 4

2.2 Excavation Area .............................................................................................................. 4

2.3 Proposed System ............................................................................................................ 4

3.0 Maintenance and Removal ........................................................................... 5

4.0 Dewatering Discharge Analysis .................................................................... 5

4.1 Parameters and Assumptions: ....................................................................................... 5 Attachments

Note: Equipment cut sheets/details included in the Attachments section are for reference only. All provided equipment will be of same or similar specifications depending on equipment availability at the time of installation. Griffin reserves the right to substitute equipment/materials as required for project completion.

1201

3 Victorville Wellness Center, Victorville, CA

1.0 Introduction

Griffin Dewatering, LLC (Griffin) is submitting this dewatering plan to Angeles Contractor (Contractor) per your request for the Victorville Wellness Center project in Victorville, CA (see Fig.1 for the location).

Per the information provided to Griffin, the project includes the construction of approximately 350 linear feet of 48 -inch sewer.

This submittal will provide a description of Griffin’s means, methods, and procedures for performing the dewatering.

Figure 1 - Project Location, Victorville, CA (Map Courtesy: Google Maps)

1202

4 Victorville Wellness Center, Victorville, CA

2.0 Project Parameters

2.1 Geology and Groundwater

Based on the Geotechnical Engineering Investigation by Merrell Engineering Company, Inc. (dated December 11th, 2020) the local hydrogeology can be summarized as follows:

Site Hydrogeology:

- Existing Ground Elevation: EL 2702-2708
- Groundwater Depth: 3-9 ft bgs (EL 2699)
- Boring B1 is considered emblematic of the site soil conditions and is included in Attachment 01.

2.2 Excavation Area

The areas of concern regarding dewatering can be summarized as follows:

Areas Requiring Dewatering:

Area STA Excavation
Depth/
Elevation
Excavation
Method
and
Dimensions
Surface
EL
SWL
EL
Amount
of
Water
Relevant
Boring
Total
Footage
(LF)
VVWRA
pipeline
replacement
1+00
to
4+47

8.5-14’
bgs/ EL
2693-
2694.5
Trenches EL
2702 to
2708
2699 4.5-6’ All
Borings
350

SWL = static water level
bgs= below ground surface

2.3 Proposed System

Deep Well System:

Griffin will install a deep well dewatering system to aid in dewatering for the above excavations. Griffin will install up to five (5) wells along one side of the VVWRA pipeline replacement at mutually agreed locations (refer to attached Dwg 01 for proposed well locations). The wells will be drilled utilizing Griffin’s bucket-auger drilling method to advance a nominal 30” diameter borehole to a depth of ±40 ft, or refusal, whichever is encountered first.

Upon completion of the borehole, Griffin will set a 12-inch well complete with up to 20 ft of standard PVC mill-slot screen (50 slot) and 20ft of PVC casing and select filter pack (#5 Rock or similar) within the annulus of the borehole (Dwg 02).

Once the well has been completed, Griffin will begin the development procedure. The well will then be developed utilizing the air-lift method.

1203

5 Victorville Wellness Center, Victorville, CA
Upon completion of the deep wells, Griffin will furnish and install a well pump system consisting of up to five (5), 10 HP, 460v, 3 phase electric submersible pumps. Each pump will be equipped with valves, fittings, and motor cable to a control panel within 10ft of the well head that will connect to Griffins electric distribution cable from the power source to the control panels.

Griffin will also provide generators to power the dewatering system. The generators would consist of the following items:
• 1 Primary Generator (125KVA) Triple Shift – Estimated fuel consumption at 4.5- 6.8 GPH – Fuel not included
• 1 Standby Generator (125 KVA) Single Shift
• 1 Auto Transfer Switch
• 1 Automatic overflow/turn-on float panel alarm (in the case water treatment tanks overflow) • 1 (600 gallon) double-wall fuel tank
• 3 Spill berms

Effluent from each well will be through a common 12” discharge manifold (HDPE) laid on grade directed to a mutually agreed upon location. The discharge line will be equipped with a totalizing flow meter to track discharge volumes. All burials and crossings will be completed by others.

3.0 Maintenance and Removal

After the installation is complete and the system is operational, Griffin will provide training of the contractor’s personnel in the ongoing operation, maintenance, inspection and reporting of the dewatering system. Upon completion of the dewatering portion of the project, Griffin will then remove and return the above system to our yard.

4.0 Dewatering Discharge Analysis

Griffin has utilized analytical calculations based on the available information and estimated the dewatering system discharge flow rate. This section of the submittal includes the details of our analysis.

4.1 Parameters and Assumptions:

Griffin evaluated the dewatering at this site utilizing both the Geotechnical Report and the provided plans and came up with the following base assumptions regarding the project and aquifer at this site:

- Excavation Dimensions: 350LF
- Excavation Depth: Approximately EL. 2693-2694.5.
- Excavation Method: Trench Boxes
- Groundwater Table: Assumed EL 2699.
- Aquifer Bottom: Approximately 40 ft below grade (EL 2665; top of the finer clayey sand unit). - Hydraulic Conductivity: Assumed to be near 0.1 – 0.3 ft/min based on the provided gradations. o Permeability Estimated using both Hazen and Prugh Methodology. Permeability was also evaluated using the HydrogeosieveXL software by the University of Kansas.

Given the above information, Griffin analyzed the dewatering for the excavations utilizing a series of analytical equations based on the Dupuit assumptions for unconfined aquifers:

1204

6 Victorville Wellness Center, Victorville, CA
Unconfined Trench Equation:

𝑄 = 𝐾(𝐻2 − ℎ𝑤2 )
458 ln 𝑅𝑜/𝑟𝑤
+ 2 [𝑥𝐾(𝐻2 − ℎ𝑤2 )
1440𝑅𝑜
]

Where K = Hydraulic Conductivity (gpd/ft2)
H = Saturated Thickness (feet)
B = Confined thickness
hw = Saturated Thickness in dewatered state (feet)
Ro = Radius of Influence (feet)
rw = Radius of Well (feet)
Q = Flow (Gallons Per Minute)
X = Trench Length (feet)

The radius of influence of a well can be estimated using an empirical relationship developed by Sichart and Kryieleis which gives Ro as a function of drawdown:

𝑅𝑜 = 2.06(𝐻 − ℎ𝑤)√𝐾 + 𝑟𝑤

By looking at the entire dewatering system/project site as a single lar ge well with a radius r w, a reasonable approximation of the required flow to dewater a site can be made.

For this project site, Griffin has estimated flows of approximately 1616 gpm, depending on the actual permeability and saturated thickness encountered. Griffin’s analytical calculations are provided below. 1205

7 Victorville Wellness Center, Victorville, CA

Figure 2 - Dewatering discharge calculations.

Project Information
Excavation Length = 350 ft
Excavation Width = 15 ft
Surface Elevation = 2705 ft
Subgrade Elevation = 2693 ft
Drawdown Below Subgrade = 2 ft
Required Drawdown = 8 ft
Water Table Elevation = 2699 ft
Bottom of Aquifer Elevation = 2665 ft
Hydrogeology
Saturated Thickness H= 34 ft
Confined Thickness (if applicable) B= 0 ft
Thickness in Dewatered State h= 26 ft
Permeability K= 0.3 ft/min
Permeability K= 3231.36 gpd/ft2
Radius of Influence Sichart (Steady State) R0= 944 ft
Equivalent Excavation Radius rs= 15 ft
Line Source L= 500 ft
Dewatering Design
System Flow= = 1616 gpm
Anticipated # of Wells= = 5 each
Depth of Well BGS= = 40 ft
Anticipated Borehole Diameter= = 30 inches
Estimated Flow Per Well= = 323.20 gpm
Well Spacing = 88 ft
1206

8 Victorville Wellness Center, Victorville, CA

Figure 3 – Radius of influence curves.

Limitations
The conclusions and recommendations presented in the submittal are based upon the assumption that the below-surface soil conditions do not differ substantially from those presented in the referenced Geotechnical Exploration Report ( Merrell Engineering Company, Inc.) and are also based upon the premise of competent monitoring and testing (by others) during the dewatering operation. It is important to recognize that subsurface conditions can vary significantly over short distances and be different from those assumed in this report. If unanticipated conditions are encountered, Griffin will re-evaluate the conclusions and recommendations in this submittal accordingly.

The dewatering services provided in connection with this project were performed in a manner consist ent with the level of care and skill ordinarily taken by a dewatering firm. The opinions and conclusions presented in the submittal are based solely upon the information provided to Griffin. No other representation, warranty, or guarantee is intended by th is submittal. In addition, no liability is assumed by Griffin for any actual/alleged settlement or subsidence of adjacent structures.

0 1
2 3
4 5
6 7
8 9
-1000-800-600-400-20002004006008001000
Drawdown (ft)
Distance (ft)
System Radius of Influence Graph
1207
X
X
X
X
Victorville Wellness Center
Victorville, CA
Deep Well Layout Diagram
01 05/23/2022
N.T.S.

K.D.

NOTES:
1) All well locations & piping
arrangement are approximate.

Actual placement to be
determined in the field.
2) Background graphic is for
reference only.

LEGEND
Deep Well
Header Pipe
Discharge
Discharge at mutually
agreed upon location
W-1
W-2
W-3
W-4
W-5
1208
15 2 3
5 61
17 21
18 19
20 ELEVATION VIEW
16 11
10 8 9
11 1214
13 22
11 14
4 14
7 7
11 MATERIAL LIST
NO. QTY. U.O.M EQUIPMENT
1 1 EA ELECTRICAL DISTRIBUTION CABLE
2 1 EA JUNCTION BOX w/ 30AMP WEATHER TIGHT TWISTLOCK CONNECTOR 3 1 EA PUMP CONTROL BOX
4 1 EA
5 1 EA PUMP CABLE
6 1 EA
PIGTAIL w/ 30AMP WEATHER TIGHT TWISTLOCK PLUG- TO CONNECT CONTROL BOX TO JUNCTION BOX- FOR UP TO 15HP @460V
7 - EA CENTRALIZER (AS REQUIRED)
8 1 EA BUTTERFLY VALVE, SUPPORTED TO PREVENT EXCESS WEIGHT ON ELBOW 9 1 EA FLANGED CHECK VALVE
10 1 LF HOSE, GROOVED ENDS (HOSE ASSEMBLY RATED TO SYSTEM SHUT OFF

PRESSURE)
11 4 EA GROOVED COUPLING
12 1 EA STEEL TAPPING SLEEVE
13 1 EA DISCHARGE PIPE
14 3 EA FLANGE X GROOVE ADAPTER
15 1 EA WELL CAP, GROOVE X GROOVE w/ 90° ELBOW, CUSTOM BUILT 16 1 EA PVC CASING
17 1 EA WELLSCREEN
18 1

EA WELLPACK
19 1 EA BOREHOLE
20 1 EA PVC BOTTOM CAP
21 1 EA RISER PIPE-ADAPTED TO GROOVE ON TOP
22 1 EA SAFETY CABLE FOR PUMP RETRIEVAL
GRIFFIN This drawing is the property of Griffin Dewatering Corporation and its associated companies and is intended only for its sole or authorized use. It may contain proprietary, public or authorized third party information. Any alteration of this drawing is prohibited, without the express, written consent of an authorized representative of Griffin Dewatering Corporation.

REV. DESCRIPTION DATE BY APPVD.

TYPICAL DEWATERING

WELL DETAIL
DRAWN:

SCALE:

DATE:

DWG:

N.T.S.
02 GRIFFIN DEWATERING L.L.C.
%.+0610&4+8'
*1756106:
6'.


Ä
(#:


Ä
'/#+.
ITKHHKP"ITKHHKPFGYCVGTKPIEQO
9'$5+6'
YYYITKHHKPFGYCVGTKPIEQO
-

TYPICAL DEWATERING WELLS
w/6" AND LARGER DISCHARGE
SUBMERSIBLE TURBINE PUMP (10HP, 460V, 3 PHASE)
(12")
(12")
(30")
(#5 rock or similar)
04/06/18
KD
40ft +/-
02 05/20/2022
20 ft +/-

COUPLING
BELOW LIST IS TYPICAL; MATERIAL

SUBSTITUTIONS MADE AS APPROPRIATE
PIGTAIL w/ 30AMP WEATAHER TIGHT TWISTLOCK PLUG- TO CONNECT

CONTROL BOX TO JUNCTION BOX
The following is not shown in the diagram to the right:
 1 Primary Generator (125KVA) Triple Shift – Estimated fuel consumption at 4.5- 6.8 GPH – Fuel not included
 1 Standby Generator (125 KVA) Single Shift
 1 Auto Transfer Switch
 1 Automatic overflow/turn-on float panel alarm (in the case water treatment tanks overflow)  1 (600 gallon) double-wall fuel tank
 3 Spill berms
1209
December 11, 2020
Geotechnical Report
Victorville Wellness Center
Victorville, California
MJ Project No. 2102.041.500
Attachment A2

ATTACHMENT 01
1210
SPT sample at 15' - CRG11042006
Tube sample at 10' - CRG11042005
No recovery at 20'
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion SA =Sieve Analysis MD =Max Density AL =Atterberg Limits CN =Consolidation Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. (1) =Bulk (2) DS =Direct Shear
SPT sample at 25' - CRG11042007
25 3, 4
SA3
SW Brown, Moist, Loose, Well graded sand
20 3, 3
3 15 4, 5
2 10 3, 3 10.1 ND
4 Ground water encountered at 9' TD
8 Tube sample at 5' - CRG11042004 TD5 5, 7 3.6 ND
9 3 5, 6 2.1 83.9 Tube sample at 3' - CRG11042003 TD
Tube sample at 1' - CRG11042002 TD
1 6, 9 3.8 86.4
6 Brown, Moist, Loose, Poorly graded sand
Bulk sample at 0' to 5' - CRG11042001 SA, MD, CR
0 Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SP
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 50' Groundwater: 9' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 1 Start Date/Time: 11/4/20 8:40 End Date/Time: - Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 1 of 2
1211
ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 2 of 2
Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 1 (Cont.d) Start Date/Time: - End Date/Time: 11/4/20 10:53 Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 50' Groundwater: 9' Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Description / Comments Lab Tests (2)
30 5, 5
Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SPT at 30' - CRG11042008
9 35 3, 6 SPT at 35' - CRG11042009
8 40 5, 9 SC Brown, Wet, Loose, Clayey sand SA
SPT at 40' - CRG1104201010
45 5, 10 SPT at 45' - CRG11042011 SA
18 50 18, 20 SPT at 50' - CRG11042012
Drilling terminated at approximately 50'19
Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed.

SA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear CN =Consolidation MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion 1212
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion SA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear CN =Consolidation Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 9 SPT sample at 25' - CRG1104201925 12, 9
3 SPT sample at 20' - CRG1104201820 3, 2
5 SPT sample at 15' - CRG1104201715 3, 3
7 SPT sample at 10' - CRG1104201610 4, 5
Groundwater encountered at 7'
5 Tube sample at 5' - CRG11042015 TD5 3, 8 9.9 84.3
9 3 5, 8 2.0 ND Tube sample at 3' - CRG11042014 TD
8 TDTube sample at 1' - CRG11042013
0 1 7, 9 2.3 ND
SP Brown, Moist, Loose, Poorly graded sand
Lab Tests (2)
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
Drive Drop (in): 30 Shoring Type: Graphic
Description / Comments
None Preservation: D4220
Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 50' Groundwater: 7 Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 2 Start Date/Time: 11/4/20 11:00 End Date/Time: - Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 1 of 2
Project Number: 2102.041.500 USA Ticket No:
1213
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion SA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear CN =Consolidation Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 11 SPT at 50' - CRG11042024
Drilling terminated at approximately 50'
50 10, 8
9 SPT at 45' - CRG1104202345 6, 7
18 Brown, Wet, Loose, Clayey sand
SPT at 40' - CRG11042022
40 12, 13 SC
14 SPT at 35' - CRG1104202135 13, 4
30 5, 8
11 SPT at 30' - CRG11042020
Lab Tests (2)
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
Drive Drop (in): 30 Shoring Type: Graphic
Description / Comments
None Preservation: D4220
Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 50' Groundwater: 7' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 2 (Cont.d) Start Date/Time: - End Date/Time: 11/4/20 12:21 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 2 of 2
Project Number: 2102.041.500 USA Ticket No:
1214
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed.

Drilling terminated at approximately 25'
25 6, 6
8 SPT sample at 25' - CRG11042027
SC Brown, Wet, Loose, Clayey sand
6 SPT sample at 20' - CRG1104202620 5, 6
5 No recovery at 15'15 8, 7
12 No recovery 10'10 9, 11
Groundwater encountered at 7'
17 No recovery at 5'5 8, 12
SABulk sample at 0' to 5' - CRG11042025
0 SW Brown, Moist, Loose, Well graded sand
Lab Tests (2)
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
Drive Drop (in): 30 Shoring Type: Graphic
Description / Comments
None Preservation: D4220
Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 7' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 3 Start Date/Time: 11/4/20 12:37 End Date/Time: 11/4/20 13:06 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 1 of 1
Project Number: 2102.041.500 USA Ticket No:
1215
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed.

Drilling terminated at approximately 25'
25 18, 17
15 SPT sample at 25' - CRG11042033
SW Brown, Moist, Medium Dense, Well graded sand SA
9 SPT sample at 20' - CRG1104203220 7, 9
14 Tube sample at 15' - CRG11042031 TD15 6, 5 14.2 99.2 10 Tube sample at 10' - CRG11042030 TD10 6, 7 3.8 99.1
Groundwater encountered at 8'
25 Tube sample at 5' - CRG11042029 TD5 15, 19 3.4 87.1
SABulk sample at 0' to 5' - CRG11042028
0 SW-SM Brown, Moist, Medium Dense, Well graded sand with silt Lab Tests (2)
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
Drive Drop (in): 30 Shoring Type: Graphic
Description / Comments
None Preservation: D4220
Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 8' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 4 Start Date/Time: 11/4/20 13:17 End Date/Time: 11/4/20 13:45 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/04/20
Sheet: 1 of 1
Project Number: 2102.041.500 USA Ticket No:
1216
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 15 Drilling terminated at approximately 25'
SPT sample at 25' - CRG1105200325 6, 11
20 14
SPT sample at 15' - CRG1105200215 6, 5
10 Groundwater encountered at 7'
10 Tube sample at 5' - CRG11052001 TD5 12, 10 13.0 ND
0 SW Brown, Moist, Medium Dense, Well graded sand
Lab Tests (2)
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
Drive Drop (in): 30 Shoring Type: Graphic
Description / Comments
None Preservation: D4220
Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 7' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 5 Start Date/Time: 11/5/20 7:37 End Date/Time: 11/5/20 8:13 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
Project Number: 2102.041.500 USA Ticket No:
1217
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 7 Drilling terminated at approximately 25'
SPT sample at 25' - CRG11052006 SA25 5, 7
20 8
SPT sample at 15' - CRG11052005 SA15 5, 9
Groundwater encountered at 11'
10 5
SPT sample at 5' - CRG110520045 3, 5
Brown, Moist, Medium Dense, Well graded sand0
Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SW
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 11' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 6 Start Date/Time: 11/5/20 8:17 End Date/Time: 11/5/20 8:33 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
1218
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 7 Drilling terminated at approximately 25'
SPT sample at 25' - CRG11052012
Gravel encountered at 23'
25 8, 5
6 SPT sample at 20' - CRG1105201120 1, 3
4 SPT sample at 15' - CRG1105201015 4, 3
3 SPT sample at 10' - CRG11052009 SA10 2, 1
Groundwater encountered at 8'
4 No recovery at 5'5 3, 4
Brown, Moist, Loose, Well graded sand
Bulk sample at 0' to 5' - CRG11052008 SA
0 Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SW
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 8' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 7 Start Date/Time: 11/5/20 8:57 End Date/Time: 11/5/20 9:19 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
1219
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 6 Drilling terminated at approximately 25'
SPT sample at 25' - CRG1105201825 5, 4
9 SPT sample at 20' - CRG11052017 SA20 5, 9
6 SPT sample at 15' - CRG1105201615 3, 5
4 SPT sample at 10' - CRG1105201510 3, 3
Groundwater encountered at 7'
6 Tube sample at 5' - CRG11052014 TD5 5, 6 14.5 91.0
Brown, Moist, Loose, Poorly graded sand with silt
Bulk sample at 0' to 5' - CRG11052013 SA, RV
0 Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SP-SM
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 7' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 8 Start Date/Time: 11/5/20 9:27 End Date/Time: 11/5/20 9:47 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
1220
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 9 Drilling terminated at approximately 25'
SPT sample at 25' - CRG1105202325 10, 9
2 SPT sample at 20' - CRG1105202220 2, 3
3 SPT sample at 15' - CRG1105202115 1, 1
SA3
Brown, Wet, Loose, Well graded sand with silt and gravel SPT sample at 10' - CRG11052020
10 3, 2 SW-SM
Groundwater encountered at 9'
4 Tube sample at 5' - CRG11052019 TD5 4, 5 10.1 ND
Brown, Moist, Loose, Poorly graded sand with silt0
Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SP-SM
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 9' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 9 Start Date/Time: 11/5/20 10:15 End Date/Time: 11/5/20 10:35 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
1221
MEC-100.6 EL 04/16 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com RV =R-Value SE =Sand Equivalent TD =Tube Density=Driven EI =Expansion Index CR =Corrosion CN =ConsolidationSA =Sieve Analysis MD =Max Density AL =Atterberg Limits(1) =Bulk (2) DS =Direct Shear Comments: "N" Value based on 2.5" diameter modified California Tube Sampler (ASTM D3550) or SPT (ASTM D1586) as noted on log. Some boulder/cobble enountered during drilling operations. Partial caving of hole observed. 11 Drilling terminated at approximately 25'
SPT sample at 25' - CRG1105202825 7, 9
Medium Dense below 25'
1 SPT sample at 20' - CRG1105202720 2, 1
3 No recovery at 15'15 3, 3
0 SPT sample at 10' - CRG11052026
10 6, 7
Groundwater encountered at 8'
8 Tube sample at 5' - CRG11052025 TD5 7, 7 16.5 ND
Brown, Moist, Loose, Well graded sand
Bulk sample at 0' to 5' - CRG11052024 SA
0 Graphic
Depth (ft)
'N' Value
Sample
(1)
Moisture (%)
Density (pcf)
Class (USCS)
SW
Description / Comments Lab Tests (2)
Drive Drop (in): 30 Shoring Type: None Preservation: D4220 Drive Weight (lb): 140 Field Tests: D3550 Sampler Insertion: Driven Equipment Type: CME-75-HSA Advance Assist: None Recent Weather: Clear Operator: C. Hartman Dimensions: 8" x 25' Groundwater: 8' Conducted By: C. Garrison Excavation Type: Auger Hole Elevation:

Location No: Boring 10 Start Date/Time: 11/5/20 11:05 End Date/Time: 11/5/20 11:55 Project Location: River Street, Victorville, CA DSA Application No:

Client: City of Victorville DSA LEA No:

Project Number: 2102.041.500 USA Ticket No:

Project Title: Victorville Wellness Center DSA File No:

ASTM D5434, D1452, D1586, D1587, D2488 (USCS), D3550 Appendix: B Permit No:

Client Project No:

Exploratory Log
Report Date: 11/05/20
Sheet: 1 of 1
1222
Particle-Size Analysis of Soil
Report Date: 11/04/20
Sheet: 1 of 1
Project Number: 2102.041.500 Other:

D422, D1140, D2487 Appendix: C
Permit No:

Client Project No:

Project Location: River Street, Victorville, CA DSA Application No:

Project Title: Victorville Wellness Center DSA File No:

Client: City of Victorville DSA LEA No:

Fines (%): 2.1%Sample ID: CRG11042007 Gravel (%): 15.5% Sand (%): 82.5% Classification, ASTM D2487: (SW) Well graded sand
Sample Origin: Boring One at 25'
Laboratory Remarks:

Cu Cc Moisture D100 D60 D30 D10 LL SG FM Other
8 1 18.0% 37.500 1.800 0.600 0.235
PL PI

ND ND ND ND ND -
Method / Procudure Used: D422
Size of Initial Dry Mass (g): 413.2
Determination of Dry Mass:

ND
D2216
Dispersion Device/Period: Manual/12 hr
Comments:

Type & Amount of Agent: Defloc. & 1.0
Particles; Shape, Hardness:

Was Not Sampled & tested in accordance with the reqs. of the DSA approved documents.

The Material Tested Met Did Not Meet The requirements of the DSA approved documents.

The Material Was
cc: Project Architect, Structural Engineer, Project Inspector, DSA Regional Office, School District MEC-035.1 MD 11/14 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com 0 10
20 30
40 50
60 70
80 90
100

0. 010. 101. 0010.00100. 00
Percent Finer by Weight
Particle Size in Millimeters
U.S. Sieve Opening In Inches U.S. Standard Sieve Number Hydrometer 3 1.5 3/4 3/8 4 8 16 30 50 100 2002 1 10 20 40 60 140
1223
Comments:

MEC-035.1 MD 11/14 Merrell Engineering Company, Inc. | 22221 US Highway 18, Apple Valley, Ca. 92308 t)760.256.2068 f)760.256.0418 w)www.merrelljohnson.com cc: Project Architect, Structural Engineer, Project Inspector, DSA Regional Office, School District The Material Was
Type & Amount of Agent: Defloc. & 1.0
Was Not Sampled & tested in accordance with the reqs. of the DSA approved documents.

The Material Tested Met Did Not Meet The requirements of the DSA approved documents.

Dispersion Device/Period: Manual/12 hr
Particles; Shape, Hardness: ND
D2216
Method / Procudure Used: D422
Size of Initial Dry Mass (g): 455.9
Determination of Dry Mass:

ND ND ND ND ND -6 1 15.3% 19.000 1.850 0.900 0.310
PL PICu Cc Moisture D100 D60 D30 D10 LL SG FM Other
Laboratory Remarks:

Sample Origin: Boring Six at 25'
Classification, ASTM D2487: (SW) Well graded sand
Fines (%): 2.1%Sample ID: CRG11052006 Gravel (%): 8.3% Sand (%): 89.6% Client: City of Victorville DSA LEA No:

Project Location: River Street, Victorville, CA DSA Application No:

Project Title: Victorville Wellness Center DSA File No:

Project Number: 2102.041.500 Other:

D422, D1140, D2487 Appendix: C
Permit No:

Client Project No:

Particle-Size Analysis of Soil
Report Date: 11/05/20
Sheet: 1 of 1
0 10
20 30
40 50
60 70
80 90
100

0. 010. 101. 0010.00100. 00
Percent Finer by Weight
Particle Size in Millimeters
U.S. Sieve Opening In Inches U.S. Standard Sieve Number Hydrometer 3 1.5 3/4 3/8 4 8 16 30 50 100 2002 1 10 20 40 60 140
1224
ATTACHMENT 02
1225
PipeLife Jet Stream, Inc.

Post Office Box 190
Siloam Springs, AR 72761
479-524-5151 O
479-524-5464 F
BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2

4.846 4.500 4.154 .173 150 57 132

5.330 4.950 4.570 .190 181 57 132

5.991 5.563 5.135 .214 229 57 132

7.135 6.625 6.115 .255 325 57 132

9.289 8.625 7.961 .332 552 57 132

11.576 10.750 9.924 .413 848 57 132

13.730 12.750 11.770 .490 1193 57 132
BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2

2.683 2.375 2.067 .154 69 310 715

4.974 4.500 4.026 .237 202 153 353

5.446 4.950 4.454 .248 233 124 286

6.079 5.563 5.047 .258 284 105 242

7.185 6.625 6.065 .280 356 77 178

9.289 8.625 7.961 .332 552 57 132

17.00 16.00 15.00 .500 1554 28 65
SCH 40
2"
4"
4 1/2"
5"
6"
8"
16"
SDR 26
4"
4 1/2"
5"
6"
8"
10"
12"
JET STREAM TWENTY +PLUS PVC WELL CASING
Chamfered Spigot Plus Bell 20' Net Hanging Length Length
BELL DEPTH BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2

7.25 7.40 6.90 6.40 .250 342 48 110
SDR 27.6
6 1/4"
BELL DEPTH BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2 The NSF Seal Certifing Well Casing Produced to ASTM F-480 standards. *16" sch 40 well casings, recommended to a max depth of 350' . 1. Hydraulic Collapse Pressure Resistance 2. Allowable head differential ATTACHMENT 03
1226
PipeLife Jet Stream, Inc.

Post Office Box 190
Siloam Springs, AR 72761
479-524-5151 O
479-524-5464 F
SIZE 8" 10" 12" 16"
Slot Width .014 .020 .050* .085 .050 .085* .050 .085* .050* .085 C-C Slot Spacing 1/2 1/2 .300 29/32 .300 29/32 .300 29/32 .300 29/32 Number Rows 5 5 5 5 6 6 7 7 7 7
Open Area Per 29.40 42.00 568.75 334.69 709.80 417.69 891.80 524.79 1297.65 758.40 (Sq. Inches) Open Area Per .50 .71 9.66 5.69 9.68 5.69 10.25 6.03 11.47 6.71 (Sq. Inches)  
5IFTFJUFNTBSFOPOTUPDLo"WBJMBCMFPOTQFDJBMPSEFSPOMZt1MFBTFTQFDJGZTMPUXJEUIXIFOPSEFSJOH LARGE O.D. SLOTTED WELL CASING
SIZE 8" 10" 12" 16"
SMALL O.D. SLOTTED WELL CASING
SIZE 4" 4 1/2" 5" **6"
Slot Width .014 .020 .035 .014 .020 .035 .014 .020 .035 .035 .050 C-C Slot Spacing 1/2 1/2 29/32 1/2 1/2 29/32 1/2 1/2 29/32 29/32 .300 Number Rows 3 3 3 3 3 3 3 3 3 4 4
Open Area Per 25.87 36.96 66.15 24.70 35.28 72.77 24.70 35.28 92.61 97.02 400.04 (Sq. Inches) Open Area Per .78 1.12 2.18 .74 1.05 2.17 .68 .97 2.44 2.15 8.86 (Sq. Inches)  
5IFTFJUFNTBSFOPOTUPDLo"WBJMBCMFPOTQFDJBMPSEFSPOMZt1MFBTFTQFDJGZTMPUXJEUIXIFOPSEFSJOHt

4MPUUFEXFMMDBTJOHBWBJMBCMFXJUIPSTMPUXJEUIVQPOSFRVFTU BELL DEPTH BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2

6.0 5.532 4.950 4.368 .291 285.90 218 503

6.5 6.217 5.563 4.909 .327 362.10 218 503
BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2

4.928 4.500 4.072 .214 193.40 112 259

6.093 5.563 5.033 .265 296.60 112 259

7.257 6.225 5.993 .316 422.00 112 259
SDR 17
4 1/2"
5"
SDR 21
4"
5"
6"
JET STREAM TWENTY +PLUS PVC WELL CASING
BELL DEPT H BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHA D2 BELL O.D. CASING O.D. CASING I.D. WALL THICK WT/CFT HCPR1 AHD2D Twenty + well casing is produced to ASTM F-480 specifications from 1120/1220 white polyvinyl chloride material type 1, grade 1 & 2, and bears the NSF Seal of Certification. Jet Stream Twenty + well casing is chamfered on the spigot end to ai in assemling the solvent weld bell joint. 1227
Certain Teed
Slotted PVC Well Casing
Certa-Lok ™ & Solvent-Weld
Superior flow performance
Corrosion resistant
Large selection of slot
configurations
Choice of joining systems
HigH PerformanCe
1228
CertainTeed – the name that contractors have come to associate with the industry’s broadest line of high-quality PVC well products – is also the industry leader in high performance slotted well casing. Using new manufacturing technology , slotted casing can now be produced with open areas and efficiencies that rival those of other screens, often at a fraction of the cost. Combine PVC screens with PVC well casing for the ultimate corrosion-resistant, low-maintenance water well!
A Size and Joining System for Every Application
Slotted casing can be produced in sizes from 2" all the way up to the largest commercially available PVC well casing product (17.4" O.D.), in a variety of wall thicknesses
and strengths to suit virtually all applications:
• Domestic
• Irrigation
• Municipal
• Aquifer Storage and Recovery
• Environmental
CertainTeed also offers a choice of joining systems:
traditional solvent-weld or the contractor-proven,
all-weather Certa-Lok
™ mechanical joint.

Slot Width Selection
A wide selection of precision-machined factory slot designs (.010"-.125") with closely spaced inlet openings provides for uniform development over the length of the screen and proper stabilization of the gravel pack.

Long Life
Well rehabilitation costs are minimized, as PVC screens are inherently more resistant than conventional steel products to clogging and encrustation. PVC also outperforms stainless steel in highly corrosive environments, at a fraction of the cost. All screens are manufactured from PVC casing that is listed by NSF International as safe for use with potable water.

Single Source for All Y our Well Product Needs
No more unloading, local-machining, and repackaging required. With CertainTeed, the industry’s best slotted casing is shipped ready to use – no field fabrication required – along with your other PVC well product needs, including solid casing, drop pipe for submersible pumps, and a variety of fittings.

The
CertainTeed
Advantage
1229
Slotted PVC and Underdrain Pipe Specifications
O.D. OPEN AREA, SQ. INCHES PER FOOT OF SCREEN (.25" SLOT SPACINg)

SLOT WIDTH INCHES

0.010 0.013 0.016 0.020 0.025 0.032 0.040 0.050 0.085 0.100 0.125 NOm. NOm. NO. OF mIN. WALL JOINT
SIzE O.D. ROWS CLASS THICkNESS AVAILAbILITY
KEY: SW = Solvent Weld Belled End, CL = Certa-Lok (w/coupling), CLIB = Certa-Lok Integral Bell * = Not available in SDR17 or SCH80
** = Equivalent to SCH40
Notes: 1. As a general rule, Flow Rating (GPM/ft) in a gravel-packed well = O.D. Open Area (in2/ft)* (.50 blockage factor)* (.31 conversion factor) at an entrance velocity of 0.1 fps.

2. Open area percentage varies from 2% to over 20%, depending upon casing size and slot width.

3. CertainT eed can supply a detailed Engineering Specification for any of the products shown, or for special made-to-order products.

4. Slots can often be lengthened on thick-wall products to provide additional I.D. penetration; revised specifications showing increased open area are available upon request.

5. Standard slot spacing = .25". Smaller and wider spacing is available - wider spacing is recommended for slot widths of .100” and above.

6. Specifications subject to change. Standard manufacturing tolerances apply.

7. All dimensions are in inches.

This chart illustrates standard manufacturing capabilities only. Not all products shown are routinely stocked – call for availability.

Slot configurations not included on this chart are covered under CertainT eed’s non-standard product warranty.

Underdrain Pipe
2" 2.375 4 SCH40 0.154 SW 2.4 3.1 3.7 4.6 5.6 7.0
3" 3.500 4 SCH40 0.216 SW 2.6 3.4 4.1 5.0 6.2 7.7
4" 4.500 4 SDR26 0.173 SW
SDR21 0.214 SW 3.0 3.9 4.8 8.0 9.7 12.2 14.8 18.2 27.2 SCH40 0.237 SW,CLIB
4 1⁄2" 4.950 4 SDR26 0.190 SW,CLIB
SCH40 0.248 SW,CLIB 3.0* 4.5* 5.4* 9.2 11.3 14.1 17.1 21.0 31.5 SDR17 0.291 SW,CLIB
5" 5.563 4 SDR26 0.214 SW
SDR21** 0.265 SW,CLIB 4.5* 5.4* 10.0 12.3 15.4 18.7 23.0 34.4 SDR17 0.327 SW,CLIB SCH80 0.375 CLIB
6" 6.625 6 SDR26 0.255 SW
SCH40 0.280 SW
,CLIB 8.2* 12.6 15.4 19.2 23.4 28.7 43.0 SDR21 0.316 SW,CLIB SDR17 0.390 SW,CLIB
6 1⁄4" 6.900 6 DR27.6 0.250 SW
6 1⁄8" SDR21 0.329 SW,CLIB 12.6* 15.4 19.2 23.4 28.7 43.0

6.9"O.D. SDR17 0.406 SW,CLIB
8" 8.625 6 SDR26 0.332 SW
SDR21 0.410 SW 14.2* 20.3 25.4 30.8 37.9 56.7 63.8 74.6 SDR17 0.508 CLIB
10" 10.750 6 SDR26 0.413 SW
SDR21 0.511 SW 22.5* 28.1 34.1 41.9 62.7 70.7 82.5 SDR17 0.632 CL
12" 12.750 8 SDR26 0.490 SW
SDR21 0.606 SW 30.0* 37.4 45.5 55.9 83.7 94.2 110.1 SDR17 0.750 CL
14" 14.000 8 SCH40 0.437 SW 32.9* 41.1

49.9 61.3 91.8 103.4 120.7 SDR17 0.823 CL
16" 16.000 10 SCH40 0.500 SW
10 SDR26 0.616 SW,CL 36.3 45.3 55.1 67.6 101.2 114.0 133.1 8 SDR21 0.762 CL 31.0 38.7 47.0 57.7 86.4 97.3 113.6 8 SDR17 0.941 CL 43.5 52.8 64.9 97.2 109.4 127.8

17.4" O.D. 17.400 8 SDR17 1.024 CL 52.8 64.9 97.2 109.4 127.8 Underdrain Pipe
Slotted PVC casing is also ideal for use as underdrain pipe.

Applications include, but are not limited to:
• Leachate collection systems for solid waste landfills • Drainage and dewatering applications
• Mining heap leach projects
PVC underdrain pipe is supplied with precision-machined slots, which provide greater intake capacity and continuous, clog-resistant drainage of fluids, as compared to standard round-hole perforated pipe. Slotted underdrain reduces entrance velocity into the pipe, thereby reducing the possibility that solids will be carried into the system. Slot rows can generally be positioned symmetrically or asymmetrically around the pipe circumference, depending upon the application. Outside diameters are generally the same for PVC and non-corrugated polyethylene (HDPE) pipe. However, the HDPE pipe must be extruded with a thicker wall (and therefore a reduced cross-sectional flow area) to obtain a comparable stiffness rating. 1230
40-37-33F © 6/08 Certain Teed Corporation Printed in U.S.A.

ExtErior: Roofing • Siding • WindoWS • fence • Railing • TRiM • decking • founda TionS • PiPe intErior: inSula Tion • gyPSuM • ceilingS
ASK ABoUt oUr otHEr CErtAintEED ProDUCtS AnD SYStEMS:

CertainTeed Corporation
Pipe & Plastics Group
P .O. Box 860
Valley Forge, PA 19482
Phone: 866-CT4-PIPE
(866-284-7473)
Fax: 610-254-5428
www .certainteed.com
Traditional Solvent - Weld Joint
– Now with a deeper bell for a
stronger, more durable bond.

Available in sizes 2" - 16".

Certa-Lok
™ – Check out the Best
Joint in Town. No more “glue and
screw” attachments. Mechanical
joint achieves full strength
instantly in all weather conditions.

Fast assembly and disassembly.

Available in sizes 10" - 17.4" O.D.

Certa-Lok
™ Integral Bell Well
Casing – All the advantages of
the contractor-proven Certa-Lok
joining system, now with a
conventional belled-end joint
for even faster assembly.

The economical choice for all of
your small-to-medium diameter
well casing requirements.

Available in sizes 4", 4
1⁄2",
5", 6", 6.9" O.D., 8".

Our Slots Pay Off Three Ways!
CertainTeed solid and slotted casing is available with a joining system to suit all of your needs:
1231
1232
1233
ATTACHMENT 04
1234
1235
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 1 of 9 ends

CASE NARRATIVE
Authorized Signature Name / Title (print) Ken Zheng, President Signature / Date
Ken Zheng, President
05/26/2022 15:30:15
Laboratory Job No. (Certificate of Analysis No.) 2205-00163 Project Name / No. 16902 1st ST., VICTORVILLE, CA 92395 Dates Sampled (from/to) 05/23/22 To 05/23/22
Dates Received (from/to) 05/23/22 To 05/23/22
Dates Reported (from/to) 05/26/22 To 5/26/2022
Chains of Custody Received Yes
Comments:

Subcontracting
Organic Analyses
1 EPA-5 1613B sample(s) reported by technician CAL were contracted to Ceres Analytical Lab All results for sub-contracted analyses may be sent separately Inorganic Analyses
1 EPA 7199 sample(s) reported by technician ECI were contracted to ENVIRO-CHEM, INC All results for sub-contracted analyses may be sent separately Sample Condition(s)
All samples intact
Positive Results (Organic Compounds)
Sample RLUnitsResultAnalyte AnalyteSampleQual Result Qual Units RL 2-Butanone (MEK) µg/L 12.5GROUNDWATER 23
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1236
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 2 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
Cyanide, Total JENSM4500-CN C,E-2011mg/L 0.010 05/25/22<0.010 1.0 Chromium III Calculation JENCalculationmg/L 0 05/26/22<0.010 1.0 [Metals]
Metals Acid Digestion TLBEPA 3010A 05/26/22Complete 1.0 Antimony TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0200 05/26/22<0.0200 1.0 Arsenic TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0200 05/26/22<0.0200 1.0 Beryllium TLBEPA 200.7 (1994 REV.4.4)mg/L 0.00500 05/26/22<0.00500 1.0 Cadmium TLBEPA 200.7 (1994 REV.4.4)mg/L 0.00500 05/26/22<0.00500 1.0 Chromium TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0100 05/26/22<0.0100 1.0 Copper TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0100 05/26/22<0.0100 1.0 Iron TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0500 05/26/22<0.0500 1.0 Lead TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0100 05/26/22<0.0100 1.0 Manganese TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0100 05/26/220.106 1.0 Nickel TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0100 05/26/22<0.0100 1.0 Selenium TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0200 05/26/22<0.0200 1.0 Silver TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0200 05/26/22<0.0200 1.0 Thallium TLBEPA 200.7 (1994 REV.4.4)mg/L 0.100 05/26/22<0.100 1.0 Zinc TLBEPA 200.7 (1994 REV.4.4)mg/L 0.0400 05/26/22<0.0400 1.0 [Mercury]
Mercury Digestion KZEPA 7470A 05/26/22Complete 1.0
Mercury KZEPA 7470Aug/L 0.50 05/26/22<0.50 1.0
[PCBs]
Sep Funnel LLE IGEPA 3510C 05/24/22Complete 1.0
Aroclor 1016 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1221 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1232 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1242 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1248 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1254 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
Aroclor 1260 IGEPA 8082µg/L 0.50 05/24/22<0.50 1.0
[Surrogates]
Tetrachloro-m-xylene IGEPA 8081A/8082%REC 50-150 05/24/2268 The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1237
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 3 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
Decachlorobiphenyl IGEPA 8081A/8082%REC 50-150 05/24/2282 [Pesticides]
Sep Funnel LLE IGEPA 3510C 05/24/22Complete 1.0
Aldrin IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
alpha-BHC IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
beta-BHC IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
delta-BHC IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
gamma-BHC IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Chlordane IGEPA 8081Aµg/L 0.50 05/24/22<0.50 1.0
4,4'-DDD IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
4,4'-DDE IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
4,4'-DDT IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Dieldrin IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Endosulfan I IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Endosulfan II IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0 Endosulfan Sulfate IGEPA 8081Aµg/L 0.10 05/24/22<0.10 1.0 Endrin IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Endrin Aldehyde IGEPA 8081Aµg/L 0.10 05/24/22<0.10 1.0 Endrin Ketone IGEPA 8081Aµg/L 0.50 05/24/22<0.50 1.0
Heptachlor IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0
Heptachlor Epoxide IGEPA 8081Aµg/L 0.050 05/24/22<0.050 1.0 Methoxychlor IGEPA 8081Aµg/L 0.50 05/24/22<0.50 1.0
Toxaphene IGEPA 8081Aµg/L 0.50 05/24/22<0.50 1.0
[Surrogates]
Tetrachloro-m-xylene IGEPA 8081A/8082%REC 50-150 05/24/2283 Decachlorobiphenyl IGEPA 8081A/8082%REC 50-150 05/24/2286 [Semi-Volatile Organics]
Sep Funnel LLE IGEPA 3510C 05/24/22Complete 1.0
n-Nitrosodimethylamine IGEPA 8270Cµg/L 0.010 05/24/22<0.010 1.0 n-Nitrosodiethylamine IGEPA 8270Cµg/L 0.010 05/24/22<0.010 1.0 bis(2-Chloroethyl) ether IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1238
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 4 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
Phenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
2-Chlorophenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 1,3-Dichlorobenzene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 1,4-Dichlorobenzene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 1,2-Dichlorobenzene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 bis(2-Chloroisopropyl)ether IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Hexachloroethane IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 n-Nitrosodi-n-Propylamine IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Nitrobenzene IGEPA 8270Cmg/L 0.0030 05/24/22<0.0030 1.0 Isophorone IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
2-Nitrophenol IGEPA 8270Cmg/L 0.0040 05/24/22<0.0040 1.0 2,4-Dimethylphenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 bis(2-Chloroethoxy)methane IGEPA 8270Cmg/L 0.0020 05/24/22<0.0020 1.0 2,4-Dichlorophenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 1,2,4-Trichlorobenzene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Naphthalene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 4-Chloroaniline IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Hexachlorobutadiene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 4-Chloro-3-Methylphenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Hexachlorocyclopentadiene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 2,4,6-Trichlorophenol IGEPA 8270Cmg/L 0.010 05/24/22<0.010 1.0 2-Chloronaphthalene IGEPA 8270Cmg/L 0.019 05/24/22<0.019 1.0 Dimethyl Phthalate(DEP) IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Acenaphthylene IGEPA 8270Cmg/L 0.0010 05/24/22<0.0010 1.0 2,6-Dinitrotoluene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Acenaphthene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 2,4-Dinitrophenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 4-Nitrophenol IGEPA 8270Cmg/L 0.010 05/24/22<0.010 1.0 2,4-Dinitrotoluene IGEPA 8270Cmg/L 0.048 05/24/22<0.048 1.0 Fluorene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
Diethyl Phthalate IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1239
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 5 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
4-Chlorophenyl Phenyl Ether IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 2-Methyl-4,6-Dinitrophenol IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 n-Nitroso-Diphenylamine IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 4-Bromophenyl Phenyl Ether IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Hexachlorobenzene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Pentachlorophenol IGEPA 8270Cmg/L 0.048 05/24/22<0.048 1.0 Anthracene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
Phenanthrene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Di-n-Butyl Phthalate IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Fluoranthene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Pyrene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
Benzyl Butyl Phthalate(BBP) IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Benzo(a)anthracene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 3,3-Dichlorobenzidine IGEPA 8270Cmg/L 0.048 05/24/22<0.048 1.0 bis(2-Ethylhexyl) phthalate IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Chrysene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0
Di-n-Octyl Phthalate IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Benzo(b)fluoranthene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Benzo(k)fluoranthene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Benzo(a)pyrene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Indeno(1,2,3-c,d)pyrene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Dibenzo(a,h)anthracene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Benzo(g,h,i)perylene IGEPA 8270Cmg/L 0.0095 05/24/22<0.0095 1.0 Dibenzofuran IGEPA 8270Cmg/L 0.0010 05/24/22<0.0010 1.0 2-Methylnapthalene IGEPA 8270Cmg/L 0.0010 05/24/22<0.0010 1.0 3/4-Methylphenol(Cresol) IGEPA 8270Cmg/L 0.0050 05/24/22<0.0050 1.0 2-Methylphenol(o-Cresol) IGEPA 8270Cmg/L 0.0050 05/24/22<0.0050 1.0 2-Nitroaniline IGEPA 8270Cmg/L 0.0030 05/24/22<0.0030 1.0 3-Nitroaniline IGEPA 8270Cmg/L 0.0030 05/24/22<0.0030 1.0 4-Nitroaniline IGEPA 8270Cmg/L 0.010 05/24/22<0.010 1.0 2,4,5-Trichlorophenol IGEPA 8270Cmg/L 0.0060 05/24/22<0.0060 1.0 The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1240
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 6 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
[Semi-Volatile Surrogates]
Nitrobenzene-D5 IGEPA 8270C%REC 10-139 05/24/2236
2-Fluorobiphenyl IGEPA 8270C%REC 5-150 05/24/2233
p-Terphenyl-D14 IGEPA 8270C%REC 10-157 05/24/2234
[VOCs by GCMS]
Acetone IGEPA 8260Bµg/L 100 05/24/22<100 1.0
t-Amyl Methyl Ether (TAME) IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Benzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Bromobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Bromochloromethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Bromodichloromethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Bromoform IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Bromomethane IGEPA 8260Bµg/L 2.0 05/24/22<2.0 1.0
t-Butanol (TBA) IGEPA 8260Bµg/L 25 05/24/22<25 1.0
2-Butanone (MEK) IGEPA 8260Bµg/L 12.5 05/24/2223 1.0
n-Butylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
sec-Butylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
tert-Butylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Carbon Disulfide IGEPA 8260Bµg/L 10 05/24/22<10 1.0
Carbon Tetrachloride IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Chlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Chloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Chloroform IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Chloromethane IGEPA 8260Bµg/L 2.0 05/24/22<2.0 1.0
2-Chlorotoluene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
4-Chlorotoluene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Dibromochloromethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2-Dibromoethane (EDB) IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2-Dibromo-3-Chloropropane IGEPA 8260Bµg/L 10 05/24/22<10 1.0 Dibromomethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
1,2-Dichlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1241
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 7 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
1,3-Dichlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,4-Dichlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Dichlorodifluoromethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1-Dichloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2-Dichloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1-Dichloroethene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 cis-1,2-Dichloroethene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 trans-1,2-Dichloroethene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2-Dichloropropane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,3-Dichloropropane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 2,2-Dichloropropane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1-Dichloropropene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 cis-1,3-Dichloropropene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 trans-1,3-Dichloropropene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Diisopropyl Ether (DiPE) IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Ethylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Ethyl-t-Butyl Ether (EtBE) IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Hexachlorobutadiene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 2-Hexanone IGEPA 8260Bµg/L 12.5 05/24/22<12.5 1.0
Isopropylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
4-Isopropyltoluene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Methylene Chloride IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 4-Methyl-2-Pentanone (MIBK) IGEPA 8260Bµg/L 12.5 05/24/22<12.5 1.0 Methyl-t-butyl Ether (MtBE) IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Naphthalene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
n-Propylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
Styrene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
1,1,1,2-Tetrachloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1,2,2-Tetrachloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Tetrachloroethene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Toluene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1242
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 8 of 9 ends

CERTIFICATE OF ANALYSIS
Date Reported
Date Received
Invoice No.

Cust #
Permit Number
Customer P.O.
95050
F038
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
Analysis Result DateMethod
05/26/22
05/23/22
Units TechRLDFQual

GRIFFIN DEWATERING LLC

DUKE WILSON
7000 JURUPA AVENUE
RIVERSIDE, CA 92504
001 Date & Time Sampled: 05/23/22 11:30@ GROUNDWATER Sample:

Sample Matrix: Aqueous
.....continued
1,2,3-Trichlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2,4-Trichlorobenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1,1-Trichloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,1,2-Trichloroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Trichloroethene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
1,2,3-Trichloropropane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Trichlorofluoromethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Trichlorotrifluoroethane IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,2,4-Trimethylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 1,3,5-Trimethylbenzene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0 Vinyl Chloride IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
m,p-Xylenes IGEPA 8260Bµg/L 2.0 05/24/22<2.0 1.0
o-Xylene IGEPA 8260Bµg/L 1.0 05/24/22<1.0 1.0
[VOC Surrogates]
Dibromofluoromethane IGEPA 8260B%REC 70-130 05/24/22120 Toluene-D8 IGEPA 8260B%REC 70-130 05/24/22100
Bromofluorobenzene IGEPA 8260B%REC 70-130 05/24/22110
Chromium, Hexavalent ECIEPA 7199 05/23/22SEE ATTACHED 1.0 Respectfully Submitted:

Ken Zheng - Lab Director
The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1243
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
A & R Laboratories, Inc.
www.arlaboratories.com [email protected]

Page 9 of 9 ends

ABBREVIATIONS
DF = Dilution Factor
RL = Reporting Limit, Adjusted by DF
MDL = Method Detection Limit, Adjusted by DF
Qual = Qualifier
Tech = Technician

QUALIFIERS
B = Detected in the associated Method Blank at a concentration above the routine RL.

B1 = BOD dilution water is over specifications . The reported result may be biased high.

D = Surrogate recoveries are not calculated due to sample dilution.

E = Estimated value; Value exceeds calibration level of instrument.

H = Analyte was prepared and/or analyzed outside of the analytical method holding time I = Matrix Interference.

J = Analyte concentration detected between RL and MDL.

Q = One or more quality control criteria did not meet specifications. See Comments for further explanation.

S = Customer provided specification limit exceeded.

The data and information on this, and other accompanying documents, represent only the sample(s) analyzed and is rendered upon condition that it is not to be reproduced, wholly or in part, for advertising or other purposes without approval from the laboratory.

USDA-EPA-NIOSH Testing Food Sanitation Consulting Chemical and Microbiological Analyses and Research 1244
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
A & R Laboratories, Inc.
[email protected] www.arlaboratories.com

QUALITY CONTROL DATA REPORT

Page 1 of 3 ends

GRIFFIN DEWATERING LLC
RIVERSIDE, CA 92504 Date Reported
Date Received
Invoice No.

Customer #
Date Sampled
95050
F038
05/23/2022
Customer P.O.
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
05/26/2022
05/23/2022
EPA 200.7 (1994 REV.4.4)Method #
Technician: TLB Date Analyzed: 5/26/2022 103163QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD
Antimony 99 110 10.5
Arsenic 104 104 0.0
Barium 102 103 1.6
Beryllium 106 108 1.1
Boron 98 99 0.8
Cadmium 103 104 0.8
Calcium 97 98 0.7
Chromium 104 104 0.5
Copper 106 107 1.0
Iron 98 102 3.2
Lead 103 104 1.0
Manganese 103 104 0.9
Nickel 102 103 0.8
Selenium 102 104 2.5
Silver 101 102 0.8
Sodium 98 99 0.8
Thallium 109 103 5.6
Zinc 103 104 0.9
Control Ranges
LCS %REC LCS %RPD
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
85 - 115 0 - 15
EPA 7470AMethod #
Technician: KZ Date Analyzed: 5/26/2022 103175QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD SPIKE
%REC
SPIKE
%DUP
SPIKE
%RPD
Mercury 90 84 6 80 82 2
Control Ranges
LCS %REC LCS %RPD SPIKE %RPD
75 - 125 0 - 25 0 - 25
EPA 8081AMethod #
Technician: IG Date Analyzed: 5/24/2022 103149QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD
4,4'-DDT 60 70 10
Aldrin 130 130 0
Dieldrin 110 120 10
Endrin 70 70 0
gamma-BHC 120 120 0
Heptachlor 67 63 4
Control Ranges
LCS %REC LCS %RPD
50 - 130 0 - 30
50 - 140 0 - 30
70 - 130 0 - 30
70 - 150 0 - 30
50 - 150 0 - 30
50 - 150 0 - 30
EPA 8081A/8082Method #
Technician: IG Date Analyzed: 5/24/2022 103149QC Reference # 001Samples
1245
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
A & R Laboratories, Inc.
[email protected] www.arlaboratories.com

QUALITY CONTROL DATA REPORT

Page 2 of 3 ends

GRIFFIN DEWATERING LLC Date Reported
Date Received
Date Sampled 05/23/2022
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
05/26/2022
05/23/2022
EPA 8081A/8082Method #
Technician: IG Date Analyzed: 5/24/2022 103149QC Reference # 001Samples
Results
BLKSRR%R
EC
Decachlorobiphenyl 140
Tetrachloro-m-xylene 120
Control Ranges
BLKSRR%REC
50 - 150
50 - 150
Technician: IG Date Analyzed: 5/24/2022 103151QC Reference # 001Samples
Results
BLKSRR%R
EC
Decachlorobiphenyl 140
Tetrachloro-m-xylene 110
Control Ranges
BLKSRR%REC
50 - 150
50 - 150
EPA 8082Method #
Technician: IG Date Analyzed: 5/24/2022 103151QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD
Aroclor 1016 100 99 1
Control Ranges
LCS %REC LCS %RPD
70 - 130 0 - 25
EPA 8260BMethod #
Technician: IG Date Analyzed: 5/24/2022 103140QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD BLKSRR%R
EC
1,1-Dichloroethene 97 96 1
Benzene 87 77 10
Bromofluorobenzene 110
Chlorobenzene 91 84 7
Dibromofluoromethan 110
Toluene 110 87 23
Toluene-D8 98
Trichloroethene 93 82 11
Control Ranges
LCS %REC LCS %RPD BLKSRR%REC
50 - 150 0 - 30
50 - 150 0 - 30
50 - 150
50 - 150 0 - 30
50 - 150
50 - 150 0 - 30
50 - 150
50 - 150 0 - 30
EPA 8270CMethod #
Technician: IG Date Analyzed: 5/24/2022 103153QC Reference # 001Samples
1246
CHEMISTRY · MICROBIOLOGY · FOOD SAFETY · MOBILE LABORATORIES FOOD · COSMETICS · WATER · SOIL · SOIL VAPOR · WASTES
909-781-6335
1650 S. GROVE AVE., SUITE C
ONTARIO, CA 91761
A & R Laboratories, Inc.
[email protected] www.arlaboratories.com

QUALITY CONTROL DATA REPORT

Page 3 of 3 ends

GRIFFIN DEWATERING LLC Date Reported
Date Received
Date Sampled 05/23/2022
2205-00163
Project: 16902 1st ST., VICTORVILLE, CA 92395
05/26/2022
05/23/2022
EPA 8270CMethod #
Technician: IG Date Analyzed: 5/24/2022 103153QC Reference # 001Samples
Results
LCS %REC LCS %DUP LCS %RPD BLKSRR%R
EC
1,2,4-Trichlorobenzen 99 87 12
1,4-Dichlorobenzene 100 89 11
2,4-Dinitrotoluene 98 86 12
2-Chlorophenol 100 89 11
2-Fluorobiphenyl 70
4-Chloro-3-Methylphe 100 87 13
4-Nitrophenol 84 73 11
Acenaphthene 99 86 13
Fluoranthene 100 85 15
Nitrobenzene-D5 73
n-Nitrosodi-n-Propylam 110 94 16
Pentachlorophenol 93 82 11
Phenol 96 82 14
p-Terphenyl-D14 72
Pyrene 96 85 11
Control Ranges
LCS %REC LCS %RPD BLKSRR%REC
44 - 142 0 - 28
36 - 124 0 - 27
39 - 139 0 - 38
24 - 134 0 - 50
43 - 116
22 - 147 0 - 33
20 - 140 0 - 38
47 - 145 0 - 23
20 - 150 0 - 25
35 - 114
41 - 230 0 - 38
20 - 150 0 - 47
20 - 130 0 - 35
33 - 141
30 - 140 0 - 36
SM4500-CN C,E-2011Method #
Technician: JEN Date Analyzed: 5/25/2022 103174QC Reference # 001Samples
Results
LCS %REC DUP %RPD
Cyanide, Total 103 0
Control Ranges
LCS %REC
80 - 120
No method blank results were above reporting limit
Respectfully Submitted:

Ken Zheng - President
1247
1248
1249
1250
1251

May 25, 2022 Ceres ID: 15297

A & R Laboratories
1650-C S. Grove Ave.

Ontario, CA 91761

The following report contains the results for the one aqueous sample received on May 24
, 2022. This sample was analyzed for 2,3,7,8-TCDD by EPA method 1613.

Rush 48-hour turn-around time was provided for this work.

This work was authorized under A & R Laboratories’ Work Order # 220500163.

Continuing Calibration Verification (CCV) Requirements
All associated calibration verification standard(s) (CCV) met the acceptance criteria.

The report consists of a Cover Letter, Sample Inventory (Section I), Data Summary (Section II), Sample Tracking (Section VI), and Qualifiers/Abbreviations (Section VII). Raw Data (Section III), Continuing Calibration (Section IV), and Initial Calibration (Section V) are available in a full report (.pdf format) upon request.

If you have any questions regarding this report, please feel free to contact me at (916)932-5011.

Sincerely,

James M. Hedin
Director of Operations/CEO
[email protected]

Page 1 of 10 ends

1252
Ceres Sample ID: Sample ID Date Received Collection Date &Time 15297-001 Groundwater 5/24/2022 5/23/220 11:30
Section I: Sample Inventory

Page 2 of 10 ends

1253
Section II: Data Summary

Page 3 of 10 ends

1254
L
Analyst: JMH Reviewed by: BS

1.000
CRS
37Cl4-2378-TCDD
Qualifiers
31-137
Labeled Standards
13C-2378-TCDD 92.4
35-197
DL - Signifies Non-Detect (ND<) sample specific detection limit.

EMPC - Estimated Maximum Possible Concentration due to ion abundance ratio failure.
(a) - Lower control limit - Upper control limit
% R LCL-UCL (a)
5/25/2022Matrix:

Sample Size:

Aqueous
Qual.
220500163
5/24/2022
Conc. (pg/L) MDL RL
Date Analyzed:

QC Batch #:

Date Received:
2633 Date Extracted:

Quality Assurance Sample
Method Blank
EPA Method 1613B

85.0 NA
Project ID:
2,3,7,8-TCDD DL= 2.37 0.772 5.00
Analyte

Page 4 of 10 ends

1255
Analyte
Analyst: JMH Reviewed by: BS
Limits (a)
25-14181.3

77.7 13C-2378-TCDD
Quality Assurance Sample
Ongoing Precision and Recovery
37-158
CRS

7.3-14.6
(a) Limits based on method acceptance criteria.
2,3,7,8-TCDD
37Cl4-2378-TCDD

9.96 Aqueous 5/25/2022Matrix: Date Analyzed:

Date Extracted:

Conc. (ng/mL) Limits (a) Labeled Standards % Rec.

QC Batch #:

EPA Method 1613B
NA
5/24/2022

1.000 L
Date Received:
2633
Sample Size:Project ID: 220500163

Page 5 of 10 ends

1256
L
Analyte
Analyst: JMH Reviewed by: BS
CRS
13C-2378-TCDD

0.955
RL Qual.
2,3,7,8-TCDD DL= 2.59 0.772 5.24
42-164
Qualifiers
31-137
DL - Signifies Non-Detect (ND<) sample specific detection limit.

EMPC - Estimated Maximum Possible Concentration due to ion abundance ratio failure.
(a) - Lower control limit - Upper control limit
37Cl4-2378-TCDD
LCL-UCL (a)
Date Collected:

Time Collected:

Conc. (pg/L) MDL
5/23/2022
Date Extracted:

Aqueous 5/25/2022
5/24/2022
Date Analyzed:
2633
11:30
Labeled Standards % R
Matrix:

Sample Size:

EPA Method 1613B

83.7 74.8
Client Sample ID: Groundwater
5/24/2022Ceres Sample ID: 15297-001 Date Received:

QC Batch #:

Project ID: 220500163

Page 6 of 10 ends

1257
Section VI: Sample Tracking

Page 7 of 10 ends

1258

Page 8 of 10 ends

1259

Page 9 of 10 ends

1260
Section VII: Qualifiers/Abbreviations

J Concentration found below the lower quantitation limit but greater than zero.

B Analyte present in the associated Method Blank.

E Concentration found exceeds the Calibration range of the HRGC/HRMS.

D This analyte concentration was calculated from a dilution.

X The concentration found is the estimated maximum possible concentration due to chlorinated diphenyl ethers present in the sample.

H Recovery limits exceeded. See cover letter.
* Results taken from dilution.

I Interference. See cover letter.

Conc. Concentration Found
DL Calculated Detection Limit
ND Non-Detect
% Rec. Percent Recovery

Page 10 of 10 ends

1261
1262
1263
VVWC #2-VVWRA-Dewatering Submittal
Created by aymanh aymanh with Autodesk® Construction Cloud™ on May 25, 2022 at 2:32 PM PDT Page 1 of 2 Submittal item detail
2-VVWRA-0: Dewatering Submittal
Status Created at Due date
Reviewed
May 24, 2022, 9:17 PM UTC
Manager Aymanh Aymanh (ACI)
Reviewer Juriarte Juriarte (Pacifica)
Co-reviewers Jay Kwon (ACI)
Juriarte Juriarte (Pacifica)
Luis Diaz (Pacifica)
Myung Chung (CMC)
Sal Diaz (Pacifica)
Sal Torres (Pacifica)
Watchers Juriarte Juriarte (Pacifica)
Luis Diaz (Pacifica)
Myung Chung (CMC)
Jay Kwon (ACI)
Sal Diaz (Pacifica)
Sal Torres (Pacifica)
Architect
Contractor
Executive
Project Engineer
Project Manager
ACI
CMC
Pacifica
Spec section VVWRA Dewatering
Spec sub section
Description Dewatering work plan
Item # Spec Rev Title Type Response
Open
1264
VVWC #2-VVWRA-Dewatering Submittal
Created by aymanh aymanh with Autodesk® Construction Cloud™ on May 25, 2022 at 2:32 PM PDT Page 2 of 2 2 VVWRA 0 Dewatering Submittal Documentatio
n
Approved as
noted
Responsible contractor Juriarte Juriarte (Pacifica)
Official response
comments
Per VVWRA GM Darron Poulsen has approved as noted - "I have consulted with staff and our on-call engineers and we are in agreement that the minimum distance from the existing pipe side or the future pipe side to the outside of the well casing has to be a minimum of 8 feet".

Official response files
For review files
SUBMITTAL #8.1 DEWATERING PLAN.PDF, May 24, 2022, 9:17 PM UTC Package
1265
DocuSign Envelope ID: 77C14108-A1F6-4BBB-BFEB-A3E56C2872A8

CREDIT BACK

CREDIT BACK

CREDIT BACK
1266
Work Order Signature Document
EZIQC Contract No.: CA-R8-GB06-123021-ACI
Victorville Wellness Center, phase 1 - supplemental #3
New W
ork Order
102420.03
Modify an Existing Work Order
Work Order Title:

Work Order Number.: Work Order Date:

X
07/11/2022
Contractor Name:

Contact:

Phone:

Contact:

Phone:

Jay Kwon
714.290.7437
Owner Name: City of Victorville
Brian Gengler
760.955.5135
Angeles Contractor Inc.

Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Sourcewell EZIQC Contract No CA-R8-GB06-123021-ACI.

Brief Work Order Description:

See attached.

X Will not apply:Liquidated Damages Will apply:

Estimated Completion Date:

Estimated Start Date: Time of Performance
Work Order Firm Fixed Price
: $254,552.92
Owner Purchase Order Number:

Approvals
Date DateAngeles Contractor Inc.City of Victorville

2.00

Page 1 of 1 ends

7/11/2022
Work Order Signature Document
1267

3.00 Detailed Scope of Work
Jay KwonTo: From: Brian Gengler
Angeles Contractor Inc.
783 Phillips Drive
City of Industry, CA 91748
714.290.7437
City of Victorville
760.955.5135
Work Order Number:

July 11, 2022Date Printed:
102420.03
Victorville Wellness Center, phase 1 - supplemental #3Work Order Title:

Brief Scope:

Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work.

PHASE 1 SUPPLEMENTAL
WORK ORDER #102420.03 SCOPE OF WORK:

I. ADDITIONAL FIVE (5) DEEP WELL DEWATERING SYSTEM WHICH INCLUDE THE FOLLOWING; A. Furnish labor, material and equipment to install additional five (5) each additional deep well deatering system to supplement the existing five well system with detailed scope of work based on Griffin Dewatering, Inc proposal B. Provide 220 KV A generator for 1-month rental cost included in Griffin Dewatering proposal with option for subsequent months rental cost
C. Provide 1000 gallon fuel tank for 1-month rental cost included in Griffin Dewatering proposal with option for subsequent months rental cost
D. Please refer to ATTACHMENT B for Griffin Dewatering, Inc proposal for scope of work, terms and conditions full details
II. ATTACHMENTS:

A. Attachment A - Change Order Agreement 2 Additional Dewatering B. Attachment B - NPP Item Backup Quote from Griffin Dewatering C. Attachment C - Notice of Delay #6 & #7
D. Attachment D - Beck Oil Diesel Delivery for June 2022 III. CLARIFICATIONS:

A. Exclude all Phase 2 Work
B. Exclude environmental clean up and disposal of hazadous materials and contaminated soil/water C. Exclude import and export of soils
D. Include Generator fuel cost for month of July 2022 based on Beck Oil delivery tickets in Attachment D E. Include an ALLOWANCE of $20,000 for 220KV A Generator fuel cost for the month of July 2022, this will re-visited and adjusted with another Supplemental work order based on the actual delivery tickets from Beck Oil F. Exclude treatment of contaminated water if required
G. Exclude Discharge and NPDES Permit Fees
Subject to the terms and conditions of JOC Contract CA-R8-GB06-123021-ACI.

Page 1 of 2 ends

7/11/2022
Scope of Work
1268
Detailed Scope of W
ork Continues..

Work Order Title:

Work Order Number: 102420.03
V
ictorville Wellness Center, phase 1 - supplemental #3
Angeles Contractor Inc. Date
DateCity of Victorville

Page 2 of 2 ends

7/11/2022
Scope of Work
1269

4.00 Contractor's Price Proposal - Summary
Owner PO #:

Victorville Wellness Center, phase 1 - supplemental #3
102420.03
CA-R8-GB06-123021-ACIIQC Master Contract #:

W
ork Order #:

Title:

Re:

July 11, 2022Date:

Proposal Value
:

Contractor: Angeles Contractor Inc.
$254,552.92
$38,941.36Generator Fuel Cost
$5,479.62Supplemental #3 Bond Fees
$210,131.94VVWRA Additional 5 Each Deep Well Dewatering System Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$254,552.92
The Percentage of NPP on this Proposal: 82.55%

Page 1 of 1 ends

7/11/2022
Contractor's Price Proposal - Summary
1270

5.00 Contractor's Price Proposal - Detail
Victorville W
ellness Center, phase 1 - supplemental #3
102420.03
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 11, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$254,552.92
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.

Generator Fuel Cost
01 22 23 00 0809 Fuel Reimbursement For GeneratorsPurchases made by the contractor for fuel will be reimbursed to the Contractor at the actual cost of the purchase, without mark-up, for which a receipt or bill is received. The Adjustment Factor
applied to Reimbursable Fees will be 1.0000. The base cost of the purchase is $1.00, quantity will adjust cost to actual purchase cost; i.e., quantity of 125 = $125.00 purchase. If there are multiple purchases, each one shall be listed separately with a comment in the "note" block to identify the purchase. 1 $22,000.00
EA
Installation =x x 22,000.00
FactorUnit PriceQuantity Total

1.00 1.1000 20,000.00

PLACEHOLDER
ALLOWANCE OF $20,000 for 220 KVA Generator Fuel Cost for the month of JULY 2022 01 22 23 00 0809 Fuel Reimbursement For GeneratorsPurchases made by the contractor for fuel will be reimbursed to the Contractor at the actual cost of the purchase, without mark-up, for which a receipt or bill is received. The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The base cost of the purchase is $1.00, quantity will adjust cost to actual purchase cost; i.e., quantity of 125 = $125.00 purchase. If there are multiple purchases, each one shall be listed separately with a comment in the "note" block to identify the purchase. 2 $16,941.36
EA
Installation =x x 16,941.36
FactorUnit PriceQuantity Total

1.00 1.1000 15,401.24
125 KV
A Generator Fuel Cost for the month of June 2022 based on Beck Oil delivery tickets $38,941.36Subtotal for Generator Fuel Cost
Supplemental #3 Bond Fees
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal.
3 $5,479.62
EA
Installation =x x 5,479.62
FactorUnit PriceQuantity Total

1.00 1.1000 4,981.47
Supplemental #3 Bond Fees (249,073.30 x 2% = $4,981.47) $5,479.62Subtotal for Supplemental #3 Bond Fees
VVWRA Additional 5 Each Deep Well Dewatering System
31 00 00 00 1004 Furnish and Install Five (5) each Additional Deep Well Dewatering System by Griffin Dewatering, Inc.
4 $210,131.94LS
Installation =x x 210,131.94
FactorUnit PriceQuantity Total
NPP 163,032.00 1.2889 1.00
NPP Item for 5 each additional Deep W ell Dewatering System per Griffin quote GD -32884 dated June 20, 2022 [NOTE This cost exclude generator fuel cost and NPDES Permit Fees] [NOTE: THERE ARE NO CTC TASK ITEM AVAILABLE FOR THIS DEEP WELL DEWATERING SYSTEM]
$210,131.94Subtotal for VVWRA Additional 5 Each Deep Well Dewatering System

Page 1 of 2 ends

7/11/2022
Contractor's Price Proposal - Detail
1271
Contractor's Price Proposal - Detail Continues..

Work Order Title:

Work Order Number: 102420.03
Victorville W
ellness Center, phase 1 - supplemental #3
Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$254,552.92
The Percentage of NPP on this Proposal: 82.55%

Page 2 of 2 ends

7/11/2022
Contractor's Price Proposal - Detail
1272
1 Jay Kwon
From: Rick Hernandez <[email protected]>
Sent: Thursday, June 23, 2022 2:36 PM
To: Jay Kwon
Cc: Luis Diaz; Ed Herrera; Salvador Diaz; Sal Torres; Juan Abad; Brian Gengler; [email protected]; Steve Spooner; Greg Edwards; Ayman Hanna; Mau Medrano
Subject: Re: (URGENT) Additional Wells/Pumps Installation is needed Thank you Jay.  We recommend all needed approvals for this proposal.

Rick Hernandez
Project Manager
[email protected]
106 S. Mentor Ave #200
Pasadena, CA 91106
Office 626.405.0131
Cell 951.453.5171

On Jun 23, 2022, at 2:34 PM, Jay Kwon <[email protected]> wrote:

Hello Team!

Please find the revised Dewatering change order agreement 2 for your review as discussed.

Your review and approval for the immediate action will be appreciated.

Thank you!

Jay Kwon | Senior Project Manager
ANGELES CONTRACTOR, INC.
783 Phillips Drive, City of Industry, CA 91748

T 626.923.3800 | F 626.923.3801 | C 714.290.7437

From: Jay Kwon
Sent: Tuesday, June 21, 2022 12:11 PM
To: 'Rick Hernandez' <[email protected]>; 'Luis Diaz' <[email protected]>; 'Ed Herrera' <[email protected]>; 'Salvador Diaz' <[email protected]>; 'Sal Torres' <[email protected]>
Cc: 'Brian Gengler' <[email protected]>; '[email protected]' <[email protected]>; Steve Spooner <[email protected]>; Greg Edwards <[email protected]>; Ayman Hanna <[email protected]> Subject: (URGENT) Additional Wells/Pumps Installation is needed

ATTACHMENT A
1273
2 Hello Team,
In addition to the change in the strara, the site experienced the increase groundwater over the weekend.

To increase the dewatering capacity, ACI hereby proposes the additional 5 wells discussed last week and an alternate of the running of additional discharge line.

Please advise by 2 PM today for potential move‐in and drilling tomorrow.

Thanks,

Jay Kwon | Senior Project Manager
ANGELES CONTRACTOR, INC.
783 Phillips Drive, City of Industry, CA 91748

T 626.923.3800 | F 626.923.3801 | C 714.290.7437

From: Jay Kwon
Sent: Tuesday, June 14, 2022 2:39 PM
To: Rick Hernandez <[email protected]>; Luis Diaz <[email protected]>; 'Ed Herrera' <[email protected]>; Salvador Diaz <[email protected]>; Sal Torres <[email protected]>
Cc: 'Brian Gengler' <[email protected]>; [email protected]; Steve Spooner <[email protected]>; Greg Edwards <[email protected]>; Ayman Hanna <[email protected]>
Subject: (URGENT) Additional Wells/Pumps Installation is needed

Hello Team,

The dewatering initiated on 6/10/22 is hampered by the clay layer found on 6/7/2022 at 29’ on per our NOD #06 as discussed.

The additional wells and pumps are to be installed to overcome the choking factors of the clay layer in the budget range of $160,000 for the additional drilling, well development, pump installation, bigger generators with a backup, and fuel tanks.

We are in the works of building this proposal in the Gordian system for their review, meanwhile, the installation of the wells and pumps is to begin as early as tomorrow.

Please advise.

Thanks,

Jay Kwon | Senior Project Manager
ANGELES CONTRACTOR, INC.
783 Phillips Drive, City of Industry, CA 91748

T 626.923.3800 | F 626.923.3801 | C 714.290.7437

From: Ayman Hanna <[email protected]>
Sent: Friday, June 10, 2022 10:27 AM
To: James Uriarte <[email protected]>
Cc: Jay Kwon <[email protected]>; Greg Edwards <[email protected]>; 'Brian Gengler' <[email protected]>; [email protected]; Luis Diaz 1274
3 <[email protected]>; Sal Torres <[email protected]>; Jay Kwon <[email protected]>; Steve Spooner <[email protected]>; Greg Edwards <[email protected]>
Subject: VVWC NOD # 6

Hello team,

Attached is the notice of delay # 6 for the records.

Regards,

Ayman Hanna | Project Engineer
ANGELES CONTRACTOR, INC.
783 Phillips Drive, City of Industry, CA 91748

T 626.923.3800 | F 626.923.3801 | C 714.501.2161

<Change Order Agreement2 - Dewatering R1 062322 V3.2 jk.pdf> 1275

Thursday, June 23, 2022

Mr. Ed Herrera
Pacifica Services, Inc.
106 S. Mentor Ave. #200
Pasadena, CA 91106

RE: VVWRA Sewer Trunk Dewatering Change Order Agreement 2

Mr. Herrera,

As discussed, the following task items wi ll be needed for the larger dewatering capacity for the increased groundwater influx from the river. The mobilization and installation will begin on 6/24/2022.

1. Additional Well installation and well development(5 wells, @ 40’), $144,002.00

2. A larger Generator Rental & Installation, $14,430.00

3. Additional Engine Services, $575x8 weeks, $4,600)

4. Exclusions: Any Fuel Cost, Any DEF for the diesel.

The estimate excludes any fees, any permit.

Gordian administration Fees are excluded
GC fee per the Sourcewell contract, bond cost are excluded

Total Lump Sum of This change order: $163,032.00

Sincerely,

Jay Kwon
Senior Project Manager
Jay Kwon
Digitally signed by Jay Kwon
DN: cn=Jay Kwon, o=Angeles Contractor,
Inc., ou, [email protected],
c=US
Date: 2022.06.23 14:05:20 -07'00'
1276
/g3
/g3
/g44/g54/g54/g56/g40/g39/g3/g55/g50/g29/g3/g51/g68/g70/g76/g73/g76/g70/g68/g3/g54/g72/g85/g89/g76/g70/g72/g86/g15/g3/g44/g81/g70/g17/g3 /g39/g68/g87/g72/g29/g3/g19/g25/g18/g19/g26/g18/g21/g19/g21/g21/g3 /g3
/g51/g53/g50/g45/g40/g38/g55/g29/g3/g57/g76/g70/g87/g82/g85/g89/g76/g79/g79/g72/g3/g58/g72/g79/g79/g81/g72/g86/g86/g3/g38/g72/g81/g87/g72/g85/g17/g3 /g3
/g20/g17/g3/g55/g75/g72/g3/g68/g69/g82/g89/g72/g16/g80/g72/g81/g87/g76/g82/g81/g72/g71/g3/g77/g82/g69/g3/g72/g91/g83/g72/g85/g76/g72/g81/g70/g72/g71/g3/g68/g3/g71/g72/g79/g68/g92/g3/g71/g88/g72/g3/g87/g82/g3/g71/g76/g73/g73/g72/g85/g76/g81/g74/g3/g86/g76/g87/g72/g3/g70/g82/g81/g71/g76/g87/g76/g82/g81/g86/g3/g86/g76/g81/g70/g72/g3/g87/g75/g72/g3 /g74/g72/g82/g87/g72/g70/g75/g81/g76/g70/g68/g79/g3/g85/g72/g83/g82/g85/g87/g3/g86/g88/g69/g86/g87/g85/g68/g87/g72/g3/g70/g82/g81/g86/g76/g86/g87/g72/g71/g3/g82/g73/g3/g73/g76/g81/g72/g85/g3/g70/g79/g68/g92/g72/g92/g3/g86/g68/g81/g71/g3/g68/g87/g3/g79/g72/g68/g86/g87/g3/g23/g19/g73/g87/g3/g71/g72/g83/g87/g75/g3/g11/g86/g72/g72/g3/g69/g82/g85/g76/g81/g74/g3 /g6/g3/g20/g12/g17/g3/g68/g87/g3/g87/g75/g72/g3/g86/g76/g87/g72/g3/g75/g68/g86/g3/g72/g81/g70/g82/g88/g81/g87/g72/g85/g72/g71/g3/g68/g3/g70/g79/g68/g92/g18/g86/g76/g79/g87/g3/g88/g81/g76/g87/g3/g86/g87/g68/g85/g87/g76/g81/g74/g3/g68/g87/g3/g21/g26/g16/g21/g28/g3/g73/g87/g3/g82/g81/g3/g68/g79/g79/g3/g87/g75/g85/g72/g72/g3/g82/g73/g3/g87/g75/g72/g3 /g76/g81/g76/g87/g76/g68/g79/g3/g71/g72/g90/g68/g87/g72/g85/g76/g81/g74/g3/g90/g72/g79/g79/g86/g15/g3/g76/g81/g3/g68/g71/g71/g76/g87/g76/g82/g81/g15/g3/g42/g85/g76/g73/g73/g76/g81/g3/g90/g76/g79/g79/g3/g71/g85/g76/g79/g79/g3/g82/g81/g72/g3/g72/g91/g87/g85/g68/g3/g90/g72/g79/g79/g3/g87/g82/g3/g76/g81/g86/g87/g68/g79/g79/g3/g68/g3 /g83/g88/g80/g83/g18/g71/g76/g86/g70/g75/g68/g85/g74/g72/g3/g86/g92/g86/g87/g72/g80/g3/g87/g82/g3/g80/g68/g78/g72/g3/g88/g83/g3/g87/g75/g72/g3/g71/g72/g90/g68/g87/g72/g85/g76/g81/g74/g3/g70/g68/g83/g68/g70/g76/g87/g92/g17/g3 /g21/g17/g3/g55/g75/g72/g3/g83/g85/g82/g77/g72/g70/g87/g3/g75/g68/g86/g3/g72/g91/g83/g72/g85/g76/g72/g81/g70/g72/g71/g3/g68/g3/g87/g76/g80/g72/g3/g76/g80/g83/g68/g70/g87/g3/g82/g73/g3/g68/g3/g87/g82/g87/g68/g79/g3/g82/g73/g3/g11/g55/g37/g39/g12/g3/g71/g68/g92/g86/g15/g3/g90/g75/g76/g70/g75/g3/g68/g73/g73/g72/g70/g87/g72/g71/g3 /g87/g75/g72/g3/g70/g85/g76/g87/g76/g70/g68/g79/g3/g83/g68/g87/g75/g3/g82/g73/g3/g39/g72/g90/g68/g87/g72/g85/g76/g81/g74/g17/g3 /g3/g3
/g3 /g133/g3 /g242/g3/g39/g68/g92/g3
/g3 /g133/g3 /g41/g88/g79/g79/g3/g39/g68/g92/g86/g3
/g3 /g132/g3 /g50/g87/g75/g72/g85/g29/g3/g55/g37/g39/g3/g71/g68/g92/g86/g3/g73/g85/g82/g80/g3/g45/g88/g81/g72/g3/g26/g87/g75/g15/g21/g19/g21/g21/g17/g3 /g3
/g22/g17/g3 /g41/g82/g85/g3/g82/g81/g72/g3/g82/g85/g3/g80/g82/g85/g72/g3/g82/g73/g3/g87/g75/g72/g3/g73/g82/g79/g79/g82/g90/g76/g81/g74/g3/g85/g72/g68/g86/g82/g81/g86/g29/g3 /g3
/g3 /g133/g3 /g49/g82/g3/g89/g72/g75/g76/g70/g79/g72/g3/g68/g70/g70/g72/g86/g86/g3/g87/g82/g3/g87/g75/g72/g3/g70/g82/g81/g86/g87/g85/g88/g70/g87/g76/g82/g81/g3/g86/g76/g87/g72/g17/g3 /g3 /g133/g3 /g50/g88/g87/g71/g82/g82/g85/g18/g72/g91/g87/g72/g85/g76/g82/g85/g3/g90/g82/g85/g78/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g83/g72/g85/g73/g82/g85/g80/g72/g71/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g133/g3 /g58/g82/g85/g78/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g83/g72/g85/g73/g82/g85/g80/g72/g71/g3/g87/g82/g71/g68/g92/g3/g71/g88/g72/g3/g87/g82/g3/g83/g85/g72/g89/g76/g82/g88/g86/g3/g85/g68/g76/g81/g17/g3 /g3 /g133/g3 /g53/g68/g76/g81/g3/g90/g68/g86/g3/g81/g82/g87/g72/g71/g3/g90/g76/g87/g75/g3/g81/g82/g3/g76/g80/g83/g68/g70/g87/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g133/g3 /g38/g85/g76/g87/g76/g70/g68/g79/g3/g71/g72/g79/g76/g89/g72/g85/g76/g72/g86/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g80/g68/g71/g72/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g132/g3 /g50/g87/g75/g72/g85/g29/g3/g3/g49/g82/g87/g3/g85/g72/g70/g72/g76/g89/g72/g71/g3/g87/g75/g72/g3/g68/g83/g83/g85/g82/g89/g72/g71/g3/g83/g79/g68/g81/g86/g3/g86/g72/g87/g3/g68/g81/g71/g3/g71/g72/g79/g68/g92/g72/g71/g3/g80/g68/g87/g72/g85/g76/g68/g79/g3/g82/g85/g71/g72/g85/g76/g81/g74/g17/g3 /g3
/g23/g17/g3 /g54/g70/g75/g72/g71/g88/g79/g72/g71/g3/g68/g70/g87/g76/g89/g76/g87/g92/g11/g76/g72/g86/g12/g3/g71/g76/g85/g72/g70/g87/g79/g92/g3/g68/g73/g73/g72/g70/g87/g72/g71/g29/g3/g11/g38/g75/g82/g82/g86/g72/g3/g68/g81/g71/g3/g71/g72/g79/g72/g87/g72/g3/g76/g87/g72/g80/g86/g3/g87/g75/g68/g87/g3/g71/g82/g3/g81/g82/g87/g3 /g83/g72/g85/g87/g68/g76/g81/g15/g3/g68/g71/g71/g3/g90/g75/g68/g87/g3/g80/g68/g92/g3/g69/g72/g3/g80/g76/g86/g86/g76/g81/g74/g3/g73/g85/g82/g80/g3/g87/g75/g72/g3/g79/g76/g86/g87/g12/g3/g42/g85/g68/g71/g76/g81/g74/g17/g3 /g3
/g24/g17/g3 /g36/g70/g78/g81/g82/g90/g79/g72/g71/g74/g72/g71/g3/g37/g92/g29/g3/g3/g3 /g3 /g3 /g3 /g3 /g3 /g3 /g3 /g50/g90/g81/g72/g85/g182/g86/g3/g41/g76/g72/g79/g71/g3/g53/g72/g83/g17/g3/g3/g3 /g39/g68/g87/g72/g3 /g3
/g55/g75/g72/g3/g72/g73/g73/g72/g70/g87/g3/g82/g73/g3/g87/g75/g76/g86/g3/g82/g81/g3/g87/g75/g72/g3/g77/g82/g69/g3/g86/g70/g75/g72/g71/g88/g79/g72/g3/g76/g86/g3/g88/g81/g71/g72/g87/g72/g85/g80/g76/g81/g72/g71/g3/g68/g87/g3/g87/g75/g76/g86/g3/g87/g76/g80/g72/g30/g3/g75/g82/g90/g72/g89/g72/g85/g15/g3/g86/g75/g82/g88/g79/g71/g3/g68/g3/g38/g82/g81/g87/g85/g68/g70/g87/g3 /g55/g76/g80/g72/g3/g40/g91/g87/g72/g81/g86/g76/g82/g81/g3/g69/g72/g3/g71/g72/g72/g80/g72/g71/g3/g81/g72/g70/g72/g86/g86/g68/g85/g92/g15/g3/g90/g72/g3/g90/g76/g79/g79/g3/g80/g68/g78/g72/g3/g68/g3/g73/g82/g85/g80/g68/g79/g3/g85/g72/g84/g88/g72/g86/g87/g3/g76/g81/g3/g68/g3/g87/g76/g80/g72/g79/g92/g3/g73/g68/g86/g75/g76/g82/g81/g17/g3 /g3
/g54/g76/g81/g70/g72/g85/g72/g79/g92/g15/g3
/g3
/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g3 /g45/g68/g92/g3/g46/g90/g82/g81/g18/g54/g72/g81/g76/g82/g85/g3/g51/g85/g82/g77/g72/g70/g87/g3/g48/g68/g81/g68/g74/g72/g85/g3 /g49/g50/g55/g44/g38/g40/g3/g50/g41/g3/g39/g40/g47/g36/g60/g3/g6/g25/g3 Jay Kwon
Digitally signed by Jay Kwon
DN: cn=Jay Kwon, o=Angeles
Contractor, Inc., ou,
[email protected], c=US
Date: 2022.06.09 07:46:30 -07'00'
1277
/g3
/g3
/g44/g54/g54/g56/g40/g39/g3/g55/g50/g29/g3/g51/g68/g70/g76/g73/g76/g70/g68/g3/g54/g72/g85/g89/g76/g70/g72/g86/g15/g3/g44/g81/g70/g17/g3 /g39/g68/g87/g72/g29/g3/g19/g25/g18/g21/g19/g18/g21/g19/g21/g21/g3 /g3
/g51/g53/g50/g45/g40/g38/g55/g29/g3/g57/g76/g70/g87/g82/g85/g89/g76/g79/g79/g72/g3/g58/g72/g79/g79/g81/g72/g86/g86/g3/g38/g72/g81/g87/g72/g85/g17/g3 /g3
/g20/g17/g3/g55/g75/g72/g3/g68/g69/g82/g89/g72/g16/g80/g72/g81/g87/g76/g82/g81/g72/g71/g3/g77/g82/g69/g3/g72/g91/g83/g72/g85/g76/g72/g81/g70/g72/g71/g3/g68/g3/g71/g72/g79/g68/g92/g3/g71/g88/g72/g3/g87/g82/g3/g87/g75/g72/g3/g76/g81/g70/g85/g72/g68/g86/g72/g71/g3/g88/g81/g71/g72/g85/g74/g85/g82/g88/g81/g71/g3/g90/g68/g87/g72/g85/g3 /g79/g72/g89/g72/g79/g17/g3/g11/g16/g20/g21/g182/g3/g69/g74/g86/g3/g87/g82/g3/g16/g28/g182/g12/g3/g3/g3 /g21/g17/g3/g55/g75/g72/g3/g83/g85/g82/g77/g72/g70/g87/g3/g75/g68/g86/g3/g72/g91/g83/g72/g85/g76/g72/g81/g70/g72/g71/g3/g68/g3/g87/g76/g80/g72/g3/g76/g80/g83/g68/g70/g87/g3/g82/g73/g3/g68/g3/g87/g82/g87/g68/g79/g3/g82/g73/g3/g11/g55/g37/g39/g12/g3/g71/g68/g92/g86/g15/g3/g90/g75/g76/g70/g75/g3/g68/g73/g73/g72/g70/g87/g72/g71/g3 /g87/g75/g72/g3/g70/g85/g76/g87/g76/g70/g68/g79/g3/g83/g68/g87/g75/g3/g82/g73/g3/g39/g72/g90/g68/g87/g72/g85/g76/g81/g74/g3/g68/g81/g71/g3/g86/g87/g68/g85/g87/g72/g71/g3/g57/g57/g58/g53/g36/g3/g72/g91/g70/g68/g89/g68/g87/g76/g82/g81/g17/g3 /g3/g3
/g3 /g133/g3 /g242/g3/g39/g68/g92/g3
/g3 /g133/g3 /g41/g88/g79/g79/g3/g39/g68/g92/g86/g3
/g3 /g132/g3 /g50/g87/g75/g72/g85/g29/g3/g55/g37/g39/g3/g71/g68/g92/g86/g3/g73/g85/g82/g80/g3/g45/g88/g81/g72/g3/g21/g19/g87/g75/g15/g3/g21/g19/g21/g21/g17/g3 /g3
/g22/g17/g3 /g41/g82/g85/g3/g82/g81/g72/g3/g82/g85/g3/g80/g82/g85/g72/g3/g82/g73/g3/g87/g75/g72/g3/g73/g82/g79/g79/g82/g90/g76/g81/g74/g3/g85/g72/g68/g86/g82/g81/g86/g29/g3 /g3
/g3 /g133/g3 /g49/g82/g3/g89/g72/g75/g76/g70/g79/g72/g3/g68/g70/g70/g72/g86/g86/g3/g87/g82/g3/g87/g75/g72/g3/g70/g82/g81/g86/g87/g85/g88/g70/g87/g76/g82/g81/g3/g86/g76/g87/g72/g17/g3 /g3 /g133/g3 /g50/g88/g87/g71/g82/g82/g85/g18/g72/g91/g87/g72/g85/g76/g82/g85/g3/g90/g82/g85/g78/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g83/g72/g85/g73/g82/g85/g80/g72/g71/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g133/g3 /g58/g82/g85/g78/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g83/g72/g85/g73/g82/g85/g80/g72/g71/g3/g87/g82/g71/g68/g92/g3/g71/g88/g72/g3/g87/g82/g3/g83/g85/g72/g89/g76/g82/g88/g86/g3/g85/g68/g76/g81/g17/g3 /g3 /g133/g3 /g53/g68/g76/g81/g3/g90/g68/g86/g3/g81/g82/g87/g72/g71/g3/g90/g76/g87/g75/g3/g81/g82/g3/g76/g80/g83/g68/g70/g87/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g133/g3 /g38/g85/g76/g87/g76/g70/g68/g79/g3/g71/g72/g79/g76/g89/g72/g85/g76/g72/g86/g3/g70/g68/g81/g81/g82/g87/g3/g69/g72/g3/g80/g68/g71/g72/g3/g87/g82/g71/g68/g92/g17/g3 /g3 /g132/g3 /g50/g87/g75/g72/g85/g29/g3/g3/g44/g81/g70/g85/g72/g68/g86/g72/g71/g3/g88/g81/g71/g72/g85/g74/g85/g82/g88/g81/g71/g3/g90/g68/g87/g72/g85/g3/g79/g72/g89/g72/g79/g17/g3 /g3
/g23/g17/g3 /g54/g70/g75/g72/g71/g88/g79/g72/g71/g3/g68/g70/g87/g76/g89/g76/g87/g92/g11/g76/g72/g86/g12/g3/g71/g76/g85/g72/g70/g87/g79/g92/g3/g68/g73/g73/g72/g70/g87/g72/g71/g29/g3/g11/g38/g75/g82/g82/g86/g72/g3/g68/g81/g71/g3/g71/g72/g79/g72/g87/g72/g3/g76/g87/g72/g80/g86/g3/g87/g75/g68/g87/g3/g71/g82/g3/g81/g82/g87/g3 /g83/g72/g85/g87/g68/g76/g81/g15/g3/g68/g71/g71/g3/g90/g75/g68/g87/g3/g80/g68/g92/g3/g69/g72/g3/g80/g76/g86/g86/g76/g81/g74/g3/g73/g85/g82/g80/g3/g87/g75/g72/g3/g79/g76/g86/g87/g12/g3/g42/g85/g68/g71/g76/g81/g74/g17/g3 /g3
/g24/g17/g3 /g36/g70/g78/g81/g82/g90/g79/g72/g71/g74/g72/g71/g3/g37/g92/g29/g3/g3/g3 /g3 /g3 /g3 /g3 /g3 /g3 /g3 /g50/g90/g81/g72/g85/g182/g86/g3/g41/g76/g72/g79/g71/g3/g53/g72/g83/g17/g3/g3/g3 /g39/g68/g87/g72/g3 /g3
/g55/g75/g72/g3/g72/g73/g73/g72/g70/g87/g3/g82/g73/g3/g87/g75/g76/g86/g3/g82/g81/g3/g87/g75/g72/g3/g77/g82/g69/g3/g86/g70/g75/g72/g71/g88/g79/g72/g3/g76/g86/g3/g88/g81/g71/g72/g87/g72/g85/g80/g76/g81/g72/g71/g3/g68/g87/g3/g87/g75/g76/g86/g3/g87/g76/g80/g72/g30/g3/g75/g82/g90/g72/g89/g72/g85/g15/g3/g86/g75/g82/g88/g79/g71/g3/g68/g3/g38/g82/g81/g87/g85/g68/g70/g87/g3 /g55/g76/g80/g72/g3/g40/g91/g87/g72/g81/g86/g76/g82/g81/g3/g69/g72/g3/g71/g72/g72/g80/g72/g71/g3/g81/g72/g70/g72/g86/g86/g68/g85/g92/g15/g3/g90/g72/g3/g90/g76/g79/g79/g3/g80/g68/g78/g72/g3/g68/g3/g73/g82/g85/g80/g68/g79/g3/g85/g72/g84/g88/g72/g86/g87/g3/g76/g81/g3/g68/g3/g87/g76/g80/g72/g79/g92/g3/g73/g68/g86/g75/g76/g82/g81/g17/g3 /g3
/g54/g76/g81/g70/g72/g85/g72/g79/g92/g15/g3
/g3
/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g66/g3 /g45/g68/g92/g3/g46/g90/g82/g81/g18/g54/g72/g81/g76/g82/g85/g3/g51/g85/g82/g77/g72/g70/g87/g3/g48/g68/g81/g68/g74/g72/g85/g3 /g49/g50/g55/g44/g38/g40/g3/g50/g41/g3/g39/g40/g47/g36/g60/g3/g6/g26/g3 Jay Kwon
Digitally signed by Jay Kwon
DN: cn=Jay Kwon, o=Angeles Contractor, Inc.,
ou, [email protected], c=US
Date: 2022.06.20 16:05:53 -07'00'
1278
Project Name Victorville Wellness Center
Project Address : 16902 1st, Street Victorville , 92395 CA No. Delivery Date Qty (GAL) Value $ Notes
1 6/9/2022 400.40 $2,593.33
2 6/13/2022 315.00 $2,213.72
3 6/15/2022 150.00 $1,104.35
4 6/17/2022 248.30 $1,719.91
5 6/20/2022 283.00 $1,939.04
6 6/22/2022 164.20 $1,161.03
7 6/24/2022 244.80 $1,661.54
8 6/27/2022 227.00 $1,492.34
9 6/29/2022 5.00 $44.94
10 6/29/2022 233.90 $1,471.04
Total = 2271.60 $15,401.24
Dewatering Diesel Delivery
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298

Initials: _______

June 20, 2022 GD-32884

Angeles Contractor
783 Phillips Drive
City of Industry, CALIFORNIA 91748-1147

Attn: Jay Kwon
Phone: 626-923-3800
Email: [email protected]

Re: Victorville Wellness Center

Dear Jay,

Thank you for contacting Griffin. We are pleased to submit our proposal for the above referenced project. This proposal outlines the proposed equipment and materials, price of the system, and any Contractor assistance that will be needed.

Project Information________________________________________________________________________

This proposal spells out additional wells and equipment to supplement the existing five well system.

The site is located in Victorville, CA and consists of 350’ of pipeline installation.

Excavations for the work will vary between EL 2691-2700. The groundwater is at EL 2699, and the soils consist of well and poorly graded sands with clayey sand. If the granular soils are not dewatered prior to construction then the excavations will flood and become unstable and unsafe.

The assumed project parameters can be summarized as follows:

Area STA Excavation
Depth/
Elevation
Excavation
Method and
Dimensions
Surface
EL
SWL
EL
Amount
of Water
Relevant
Boring
Total
Footage
(LF)
VVWRA
pipeline
replacement
1+00
to
4+47

8.5-14’ bgs/
EL 2693-
2694.5
Trenches EL 2702
to 2708
2699 4.5-6’ All
Borings
350
*bgs – Below Ground Surface. Pipe excavations include approximately 1’ of over-excavation. ***Listed static water level is based on t he water table elevation shown on sheet no. 3 in the referenced precise grading plans. Actual encountered groundwater elevation may vary.

Our proposal is based on the information provided, specifically:
• Geotechnical Investigation Report provided by Merrell Engineering Company, Inc. (12/11/2020; M.J. Project No. 2102.041.500)
• Infiltration Report provided by Merrell Engineering Company, Inc. (11/09/2020; M.J. Project No. 2102.041.500) • Precise grading plans provided by the City of Victorville Engineering Department (01/03/2022; WDID No. 6B36C396947)
• Wet utility plans provided by Victorville Engineering Department (10/08/2021; WDID No. 6B36W00481) • UNE interceptor plans (addendum 4) provided by Victor Valley Wastewater Reclamation Authority (11/2013, Project No. 135-09065-11001)10th street sewer lift station plans provided by the City of Victorville Engineering Department (10/06/2015; Drawing No. SP-735)

ATTACHMENT B
1299
Re: Victorville Wellness Center

Initials: _______

Scope of Work_____________________________________________________________________________

Based on the above information, Griffin will provide and install the following scope of services:
• Type of proposed System: A deep well dewatering system along one side of the pipeline trench. • Installation Method: Five additional wells will be drilled in between existing wells up to 40’ deep, utilizing Griffin’s bucket auger drilling rig to drill up to a 30” diameter borehole. Deep wells come complete with screen, casing, riser pipe and a select filter pack.
• Pumping System: Submersible turbine pumps within each well. Pumping system comes complete with a check valve, butterfly valve, swing hose, control panel and motor cable to within 10’ of the borehole at the surface. • Power Requirement: Minimum, 460V, 3Ø, 150amps
• Discharge: Up to 900LF of discharge pipe/hose routed to a mutually agreed upon location. • This header pipe will be placed along side the existing discharge header. • Removal & Demobilization: Upon completion of dewatering, Griffin proposes to remobilize to the site and remove all Griffin materials and return them to the nearest Griffin yard.

Assumptions:
• It is assumed that all of the wells can be completed under one mobilization. • Griffin is assuming a static water level (SWL) of EL 2699 across the project area. • Upon completion of a series of wells, Griffin recommends performing a pump test to verify Griffin’s assumptions on the aquifers characteristics and system performance. • Griffin is assuming a permeability range of 0.1-0.3 ft/min for this site. • It is assumed that water bearing sands will be encountered to a depth of 30ft in the areas requiring dewatering. • No guarantees are made regarding the adequacy of this system. Griffin will share our f ull dewatering plan once a commitment is made.
• Subcontractor has not independently verified subsurface conditions and is relying on the continuity and accuracy of the geotechnical report

Attached please find the following:
• Attachment A – Pricing
• Attachment B – Contractor’s Obligations
• Attachment C – Terms & Conditions

Griffin Dewatering thanks you for the opportunity to submit this proposal and we look forward to the possibility of working with you on this project. If you have any questions or concerns or would like to discuss this project in more detail, please do not hesitate to contact me. I am frequently in the area and would be happy to schedule a time to meet at your office to review the work plan in greater detail. I can always be reached at 951-258-9430.

Sincerely,

Duke Wilson

This proposal for stated services above, along with the attached terms and conditions and any exclusions or exceptions indicated is acceptable. Griffin Dewatering is hereby authorized to perform the stated scope of work as priced.

Accepted this day of __ , 20___ Signature: ___

Name: Title: Company:

1300
Re: Victorville Wellness Center

Initials: _______

Attachment A – Pricing
Base Contract: Per Unit Price Unit Quantity Total
1 Pre-Construction Services $6,150.00 LS 1

$6,150.00
2 Mobilization $12,502.00 LS 1 $12,502.00
3 Furnish & Installation of Deepwell System $118,250.00 LS 1

$118,250.00
4 Monthly Rental $3,434.00 Month 0 $
5 Removal & Demobilization $7,100.00 LS 1 $7,100.00

Base Contract Total:

$144,002.00

Griffin can also provide upsized generators to power the dewatering system at the following rates. The generators
would consist of the following items:
• 1 Primary Generator (220KVA) Triple Shift – Estimated fuel consumption at 7.1- 9.3 GPH – Fuel not included
• 1 Standby Generator (220 KVA) Single Shift
• 1 Auto Transfer Switch
• 3 Spill berms
The pricing for the above-mentioned generators and associated items is:
o Deliver, set-up, remove + 1st month rent at $14,430
o Subsequent months at $13,610
o Engine Service once per week at $575
Engine service will be provided by a Griffin mechanic, who is technically trained on our automated pumping systems – shutting down and proper starting up after service is completed is critical.

A 1000 Gallon Fuel cell can be installed on the above system for:
• 1000 gallon fuel tank – Del + setup + remove + 1st month rent is $3,200 – 2nd month is $1,600

All local, state, and federal taxes and fees are additional to any pricing shown herein.

NPP Cost Breakdown;

1. Additional 5 Dewatering Base Contract = $144,002.00

2. 220 KVA Generator Set = $14,430.00

3. Engine Service = $575 x 8 = $4,600.00
NPP Total Amount = $163,002.00
1301
Re: Victorville Wellness Center

Initials: _______

Attachment B - Contractor Obligations

1. All earth work, including but not limited to, all necessary access/egress accommodating of two-wheel drive construction, line, grade, level right-of-way and work areas.

2. Equipment pads which provide a minimum of 5 feet of reverse head for the drilling of wells.

3. If required, any scaffolding, bracing, mats, plates and/or benches to facilitate the installation and service of the dewatering equipment, construction and maintenance of trenches, berms, dikes, ditches, excavations and all other reasonable and necessary site preparation and protection of work site.

4. Provide any required waterproofing / sealing of well penetrations through foundations, cutting, coring, or sleeving.

5. Performance of a site survey, which physically indicates by survey stakes the location of all well sites and other equipment and materials to be installed in accordance with this agreement.

6. Removal of surface water, ice, snow and any unusual or unnatural underground and surface obstructions, including concrete.

7. Marking and any necessary relocation or protection of all on-site and surrounding utilities and service lines, above and beneath the ground. Subcontractor will obtain all governmental required utility notification/identification reports from the local “utility locating service”. However, Contractor shall provide final ve rification that all potential underground facilities, of any kind, have been identified and that the location provided by Contractor for Subcontractor’s work will not conflict with any such facilities.

8. Provide and maintain as current all permits, licenses (other than Subcontractor’s trade licenses), approvals, fees, and authorizations required for the completion of Subcontractor’s work, including but not limited to discharge, drilling, and abandonment permits.

9. Provide jobsite security, and all required pedestrian and traffic control, and protection.

10. Provide adequate control of water resulting from or accumulating as perched or trapped water, overtopping water, runoff, seepage, surface water, interface water, and water in any other form, or from a source, not collected by the equipment.

11. Provide all required: monitoring, sampling, testing, containment, treatment, and disposal of discharge water including, if necessary, containment, cleanup (settling and/or turbidity curtains, etc.), and set the discharge so as to not recharge the dewatered areas.

12. Provide protection of adjacent property from, and containment, treatment, and disposal of: all drilling cuttings, excavation spoil, and spent drilling and jetting fluids and all other fluids which are the byproduct of the work. Provide adequate protection of Subcontractor equipment from freezing and flooding conditions. Contractor will be responsible for all expenses resulting from loss or damage to Subcontractor’s equipment not caused by Subcontractor or due to standard wear and tear, including the costs of replacement removal, return, and repair. Contractor is responsible for heat tracing or insulation of any kind.

13. Provide adequate and readily accessible water source within 100lf of the work locations, including water meter and/or backflow preventer if required, and/or sufficient water truck support, so as not to impede work progress.

14. Provide suitable electrical power and stand-by power adequate for the equipment.

15. Provide all personnel for operation and maintenance (including start -up and testing) of all dewatering and/or treatment equipment installed including manpower, fuel, electricity, lubricants, fuel tanks, secondary containment, standby power, settlement tanks, all system / site monitoring, removal of waste, changing of filters, flocculent, filter media, additive chemicals, etc. when needed, and all system modifications and/or changes.

16. Provide a suitable excavator, front -end loader, and/or crane, if required, which are manned, fueled, and maintained for Subcontractor’s use during all unloading, installations, repairs, modifications, removals, and loading.

17. Provide removal, cleaning, and return of Subcontractors equipment upon completion of usage, including the removal/treatment/disposal of any solids/liquids from any primary or secondary containment vessels and any tanks. If Subcontractor has agreed to perform these activities, then Contractor shall provide on -site all necessary facilities/materials, including any disposal, to accomplish these activities.

18. Provide for restoration of the work site upon project completion, including the abandonment of wells, wellpoints, piezometers, monitoring wells, or other holes, and any remedial or restoration repairs / patchin g to concrete, asphalt, or other surfaces and grouting.

19. Provide all required sound barriers, walls, or other visual and sound isolation/noise abatement measures.

20. Provide personnel, equipment and materials for any required dust control and access maintenance resulting from any activities of Subcontractor or its Subcontractors/suppliers.

21. Provide all “as-built” drawings and any required review/signature/stamp of a Professional Engineer.

22. Estimate based upon - Normal Working Hours (7:00am – 3:30pm).

23. Contractor shall notify Subcontractor in writing when the Dewatering shall be terminated. 1302
Re: Victorville Wellness Center

Initials: _______

Attachment C - Griffin Dewatering and Affiliated Companies Standard Terms and Conditions A. This agreement, and any offer by any Griffin Company (Griffin) are subject to the following terms and conditions. The terms, conditions, and other provisions of this Agreement constitute the entire agreement between the parties. It is expressly understood it can be modified only in a writing signed by both parties. This Agreement is for the benefit of the named parties only and does not confer a benefit upon any other named or unnamed third party. Griffin objects to and rejects any additional or different terms proposed by Purchaser.

B. Unless stated in the Proposal, Griffin is not obligated to satisfy any specific contract specification and will only assume t he obligation to supply the equipment and perform the work stated herein. Any additional equipment and/or services required can be provided by Griffin, if mutually agreed to or will be the responsibility of others. No liabilities, warranties, or guaran tees, beyond those stated herein, are assumed by Griffin. This nature and scope of services to be provided pursuant to this Agreement and the pricing contained herein are based on the site information referenced in the Proposal. Griffin has not independently verified the conditions affecting the site and Griffin is solely relying on the accuracy and complet eness of the information referenced in the Proposal. Purchaser acknowledges that, if conditions are materially different than those shown or presente d to Griffin in the site information furnished by Purchaser, Griffin shall be entitled to an equitable adjustment in the Agreement price and schedule.

C. The pricing stated in this Agreement will be honored by Griffin for only 30 days from the date the Proposal is submitted to Purchaser for acceptance, unless the parties agree in writing to extend the 30-day period.

D. Pricing is based on Griffin’s regular rate for labor and normally scheduled business hours 7:00 AM– 3:30 PM Monday through Friday. It is the responsibility of the Purchaser to determine whether federal, state, or local prevailing wage requirements apply and to notify Griffin if prevailing wages apply. If it is later determined that prevailing wages apply, and Griffin was not previously notified by Purchaser, Purchaser agrees to pay the prevailing wage from that point forward, as well as a retroactive payment adjustment to bring previously paid amounts in line with prevailing wages.

E. Terms of payment for Services are net 30 days. No retainage shall be withheld from any payments due Griffin unless authorized by Griffin in the Price section of this Agreement.

F. All scheduling shall be mutually agreed to, prior to the commencement of the work. Griffin shall be permitted to perform its work in a continual and uninterrupted manner. The Purchaser shall be responsible for all reasonable costs and additional charges associated with any delays or other interferences or impacts (“Delays”) to Griffin’s work to the extent Griffin is not the cause thereof.

G. Griffin shall not accept, or be bound by, any liquidated, indirect, and /or consequential damage.

H. To the fullest extent permitted by law, the total aggregate liability of Griffin (and its related corporations and employees) to Purchaser and third parties granted reliance is limited to Griffin's fee, for any and all injuries, damages, claims, losses, or expenses (including attorney and expert fees) arising out of Griffin's services or this agreement. This limitation shall apply regardless of available insurance coverage, cause(s) or the theory of liability, including negligence, indemnity, or other recovery.

I. Griffin shall provide at its own expense and shall maintain during the period during which any services are furnished pursuant to this Agreement its standard liability and workers compensation insurance coverage. A Certificate of Insurance will be furnished upon request. This Certificate of Insurance shall not expand Griffin’s duty to insure beyond the scope and amount of coverage specifically stated herein. Griffin shall be reimbursed for the costs of any additional coverage requested in excess of its existing policy that Griffin agrees to obtain. Griffin shall not be liable for or required to provide any bond, or costs thereof.

J. Purchaser shall indemnify and hold harmless Griffin, its parents, subsidiaries, affiliates, agents, officers and employees fr om any and all claims, demands, causes of action, damages, costs, expenses, actual attorneys’ fees, losses or liabilities, in la w or in equity, of every kind and nature whatsoever arising out of or in connection with Griffin’s work performed and/or contemplated under this Agreement for, but not limited to, bodily injury, sickness, disease or death, and damage to property of another, including by not limited to the loss of use resulting there from. (All collectively referred to as “Claims”) This obligation specifically includes, but is not limited to, the following Claims:
• Claims arising out of subsidence and/or settlement at the Project site or adjacent areas; • Claims arising out of the presence of any contaminated, hazardous, or toxic matter located on or near the Project site; • Claims for damage to water wells;
• Claims arising out of the failure to treat chemical or other constituents (contaminants) identified in water quality samples for treatment prior to discharge or disposal.
• Claims arising out of the operation or use of any Equipment supplied by Griffin pursuant to this Agreement. 1303
Re: Victorville Wellness Center
Initials: _______
• Claims arising out of Construction Defects occurring after Griffin’s Equipment is removed Purchaser, however, shall not be obligated under this Agreement to indemnify Griff in for Claims arising from the sole negligence or willful misconduct of Griffin. Purchaser further agrees to assume all costs and liability associated with the handling and disposal of any contaminated, hazardous, or toxic matter encountered during the course of the Project.

K. Any notices required under the terms and conditions of this Agreement shall be delivered to Griffin at the Griffin office tha t originated this Agreement and shall not be effective until received by Griffin as required herein.

L. This Agreement will be governed by the laws of the state of Texas without regard to its choice of law provisions. Griffin and Buyer agree that any litigation involving this Contract will be brought exclusively in federal or state courts located in Har ris County, Texas. each party hereby consents to personal jurisdiction in any federal or state court within Houston, Harris county, Texas and irrevocably waives, to the fullest extent permitted by applicable law and the laws of the state of Texas, any claim or objection that it may now or hereafter have, that venue or personal jurisdiction is not proper with respect to any such dispute.

In the event of litigation between the parties to this Agreement to enforce the rights under this section, reasonable attorne ys’ fees and costs shall be awarded to the prevailing party.

M. Unless otherwise mutually agreed herein, Griffin shall not supply or pay operators required to operate the equipment during the Rental Period. All operators shall be competent. If Purchaser assumes the responsibility for the operation of the Equipment, Purchaser acknowledges that it is solely responsible for operation of the Equipment, assumes all risks inherent in the operation and use of the Equipment, and agrees to take all necessary precaution to protect all persons and property from injury or damage while Purchaser is in possession of the Equipment. Griffin includes the cost of up to 2 regular time work hours to train Purchaser personnel in operation/maintenance of Griffin equipment.

N. Unless otherwise stated herein, the price assumes that all work will be performed under maximum PPE Level D; no exposure to, or handling of, any contaminated, toxic, or controlled substances has been included; and any site specific health and safety plans, and their implementation (monitoring, reporting, PPE materials, decontamination/cleanup, disposal, etc.), shall be by others. Purchaser shall provide and pay for any special or site-specific training (environmental or otherwise) required for work on the project.

O. All Griffin requirements for Purchaser supplied materials, manpower, electric/fuel, equipment, services, etc. are estimates only, and Griffin is not responsible if quantities needed exceed those estimates.

P. All drilled and/or jetted holes or exca vations shall be to the depth stated in the Scope of Work or terminated due to refusal, whichever comes first and as determined by Griffin
Q. Purchaser shall pay Griffin rental for the Equipment for the entire rental period in accordance with the following:
a). Minimum Monthly Rental Periods shall not be subject to any deductions. b). The Rental Period commence upon equipment arriving on site and will terminate upon the return of all equipment to the facility designated by Griffin for return, freight prepaid by Purchaser.

R. Griffin shall not be liable for any loss, damage or expense resulting from delay or failure in the performance of Griffin’s obligations hereunder if such delay or failure is due to acts of God or the public enemy, strikes, labor troubles, fire, explosions, riots, war, governmental orders or restrictions, shortages of materials or labor, delay in transportation, theft, accidents o r any other cause which is beyond Griffin’s reasonable control. Upon the occurrence of any such event preventing the Griffin from performing all of its then outstanding contracts, the Griffin shall then be entitled to perform such of its contracts as it may select and shall incur no liability to the Purchaser by reason of performing contracts other than this agreemen t. The Griffin’s total liability for damages related to the performance of or failure to perform this agreement shall be limited to the amount of th e contract price. IN NO EVENT SHALL THE GRIFFIN BE LIABLE FOR LOSS OF PROFITS BY REASON OF PLANT

SHUTDOWN, NON- OPERATION OR INCREASE IN EXPENSE OF OPERATION OF OTHER EQUIPMENT OR FACILITIES OR FOR ANY SPECIAL, INDIRECT OR CONSEQUENTIAL DAMAGES. 1304
Subcontractor Listing
102420.03
Victorville W
ellness Center, phase 1 - supplemental #3
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 11, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$254,552.92
%DutiesName of Contractor Amount
Griffin Dewatering LLC Deep Well Dewatering System 65.75$167,366.00

6.00

Page 1 of 1 ends

7/11/2022
Subcontractor Listing
1305
Work Order Signature Document
EZIQC Contract No.: CA-R8-GB06-123021-ACI
Victorville W
ellness Center, phase 1 - supplemental #4
New Work Order
102420.04
Modify an Existing Work Order
Work Order Title:

Work Order Number.: Work Order Date:

X
07/06/2022
Contractor Name:

Contact:

Phone:

Contact:

Phone:

Jay Kwon
714.290.7437
Owner Name: City of Victorville
Scott Webb
760.955.5135
Angeles Contractor Inc.

Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Sourcewell EZIQC Contract No CA-R8-GB06-123021-ACI.

Brief W
ork Order Description:

Additional scope as related to mobilization of Connect Homes modulars. See DSOW for details.

X Will not apply:Liquidated Damages Will apply:

Estimated Completion Date:

Estimated Start Date: Time of Performance
W
ork Order Firm Fixed Price: $222,388.87
Owner Purchase Order Number:

Approvals
Date DateContractorCity of Victorville

2.00

Page 1 of 1 ends

7/6/2022
Work Order Signature Document
1306

3.00 Detailed Scope of Work
Scott WebbJay KwonTo: From:

Angeles Contractor Inc. City of V ictorville
783 Phillips Drive No Data Input
City of Industry, CA 91748 No Data Input,
714.290.7437 760.955.5135
Work Order Number:

July 06, 2022Date Printed:
102420.04
Victorville Wellness Center, phase 1 - supplemental #4Work Order Title:

Brief Scope: Additional scope as related to mobilization of Connect Homes modulars. See DSOW for details.

Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work.

VICT
ORVILLE WELNESS CENTER PHASE 1-SUPPLEMENTAL WORK ORDER #102420.04 SCOPE OF WORK:

This supplemental is only for the transportation and delivery of 46 each modular shelter units from Connect Homes [CH] factory in San Bernardino, CA to Southern California Logistics Airport [SCLA].

This proposal includes all labor, materials, equipment and operators needed to accomplish the following scope unless otherwise noted.

1. Receive 46 Connect Homes shelter units from CH factory at 1822 Riverview Drive, San Bernardino, CA 92408 per delivery schedule.

2. Transport 46 Connect Homes shelter units from CH factory to SCLA yard located at 18374 Phantom Way, Victorville, CA 92394 per delivery schedule including all road permitting.

3. Provide 4 points of transportaion cribbing with 2"x12"x24" lumber to each shelter unit at CH factory.

4. Provide 3 points of staging cribbing with 4"x6"x12' on each end and in the middle of shelter module side to side at SCLA staging yard.

5. Offload 46 Connect Home shelter units with Crane using spreader bar at SCLA staging area.

CLARIFICATIONS AND EXCLUSIONS:

1. Exclude anchoring of Connect Homes shelter units at SCLA staging yard including strapping and/or staking units to the ground.

2. Exclude any barrier or temporary fencing at storage yard.

3. Exclude any seismic and wind protection to Connect Homes shelter units.

4. All works to be performed during business days Monday thru Friday and regular working hours.

5. Release Angeles Contractor, Inc. [ACI] and it's vendors liabilities and responsibilities for the shelter units upon delivery to SCLA and acceptance by City of Victorville representative including bill of ladding and insignias provided by Connect Homes.

Subject to the terms and conditions of JOC Contract CA-R8-GB06-123021-ACI.

Page 1 of 2 ends

7/6/2022
Scope of Work
1307
Detailed Scope of Work Continues..

Work Order Title:

Work Order Number: 102420.04
Victorville W
ellness Center, phase 1 - supplemental #4
Contractor Date
DateCity of Victorville

Page 2 of 2 ends

7/6/2022
Scope of Work
1308
1309
Modular Building
Delivery of 46 ea. Shelter Units
only from the factory to the SCLA,
Victorville, CA
Transportation of Modular units
(51 miles) from San Bernardino, CA
To Southern California Logistics Airport
18374 Phantom St. Victorville.
1310
VWC Modular Storage Location in Sothern California Logistics Airport Lat. 34.600031, Log. -117.374958
1311
1312
1313

Connect Shelter Victorville – Production Schedule
June 30, 2022
Proposed Shelter Module Pick Up Timeline*

PRE-PICK UP

MEETING/
MODULE

INSPECTION BY VV

PICK UP
DATE

MODULES WEIGHT
(LBS)
HEIGHT
(FT)
LENGTH
(FT)
WIDTH
(FT)
7/6/2022 7/7/2022 Victorville Shelter 4 CS01 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS02 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS03 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS04 - A 20,700 11'-5" 4 0'-3" 9'-0" 7/13/2022 7/14/2022 Victorville Shelter 4 CS05 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS06 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS07 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS08 - A 20,700 11'-5" 4 0'-3" 9'-0" 7/20/2022 7/21/2022 Victorville Shelter 4 CS09 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS10 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS11 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS12 - B 20,700 11'-5" 4 0'-3" 9'-0" 7/22/2022 7/25/2022 Victorville Shelter 4 CS13 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS14 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS15 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 4 CS16 - B 20,700 11'-5" 4 0'-3" 9'-0" 7/27/2022 7/28/2022 Victorville Shelter 2 CS1 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS2 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS3 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS4 - A 20,700 11'-5" 4 0'-3" 9'-0" 7/29/2022 8/1/2022 Victorville Shelter 2 CS5 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS6 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS7 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS8 - A 20,700 11'-5" 4 0'-3" 9'-0" 8/3/2022 8/4/2022 Victorville Shelter 2 CS9 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS10 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS11 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS12 - B 20,700 11'-5" 4 0'-3" 9'-0" 8/5/2022 8/8/2022 Victorville Shelter 2 CS13 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS14 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 2 CS15 - B 20,700 11'-5" 4 0'-3" 9'-0" 1314

Connect Shelter Victorville – Production Schedule
June 30, 2022

Victorville Shelter 2 CS16 - B 20,700 11'-5" 4 0'-3" 9'-0" 8/10/2022 8/11/2022 Victorville Shelter 1 CS1 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS2 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS3 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS4 - A 20,700 11'-5" 4 0'-3" 9'-0" 8/12/2022 8/15/2022 Victorville Shelter 1 CS5 - A 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS6 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS7 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS8 - B 20,700 11'-5" 4 0'-3" 9'-0" 8/17/2022 8/18/2022 Victorville Shelter 1 CS9 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS10 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS11 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS12 - B 20,700 11'-5" 4 0'-3" 9'-0" 8/17/2022 8/18/2022 Victorville Shelter 1 CS13 - B 20,700 11'-5" 4 0'-3" 9'-0" Victorville Shelter 1 CS14 - B 20,700 11'-5" 4 0'-3" 9'-0"

1315
1 Jay Kwon
From: Ed Herrera <[email protected]>
Sent: Friday, June 24, 2022 2:16 PM
To: Jay Kwon
Cc: Ayman Hanna; Steve Spooner; Salvador Diaz; Juan Abad; Rick Hernandez Subject: FW: Connect Homes Transportation
Hi Jay
Please start working on the supplemental work order as noted.

Let me know if there’s alternatives to transport and storage this units.

From: Brian Gengler <[email protected]>
Sent: Friday, June 24, 2022 1:20 PM
To: Ed Herrera <[email protected]>
Cc: Stephan Longoria <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]> Subject: RE: Connect Homes Transportation

All,

The transportation will need to be a supplemental work order to the ACI phase 1 contract. The City cannot contract directly with a transportation company quickly enough to meet the July 1 deadline. This is 1 week from today. This needs to be arranged ASAP.

Thanks, Brian

From: Ed Herrera <[email protected]>
Sent: Friday, June 24, 2022 10:35 AM
To: Allison van Heugten <allison@connect‐homes.com>; Brian Gengler <[email protected]> Cc: Stephan Longoria <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]> Subject: RE: Connect Homes Transportation

[EXTERNAL EMAIL]: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.

Thanks Alison, appreciate your quick response

From: Allison van Heugten <allison@connect‐homes.com>
Sent: Friday, June 24, 2022 10:23 AM
To: Ed Herrera <[email protected]>; Brian Gengler <[email protected]> Cc: Stephan Longoria <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]> Subject: Re: Connect Homes Transportation

Hi Ed,

1316
2 We will have 8 units ready to go.

Thank you,
Allison

The
linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the
link points to the correct file and location.

ALLISON VAN HEUGTEN
Project Manager

+1 (361) 728-5964
706 S. Hill St. #1060
Los Angeles, CA 90014

CONNECT-HOMES.COM

From: Ed Herrera <[email protected]>
Sent: Friday, June 24, 2022 10:11 AM
To: Allison van Heugten <allison@connect‐homes.com>; Brian Gengler <[email protected]> Cc: Stephan Longoria <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]> Subject: RE: Connect Homes Transportation

Hi Alison
Just need to confirm if we are still going to receive 4 units or more? Please advice.

From: Allison van Heugten <allison@connect‐homes.com>
Sent: Friday, June 24, 2022 9:54 AM
To: Brian Gengler <[email protected]>
Cc: Stephan Longoria <[email protected]>; Ed Herrera <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]>
Subject: Re: Connect Homes Transportation

Hi Bryan,

1317
3 The first units will need to transported to a storage site next Friday, July 1st.

Let me know if you have any further questions.

Thank you,
Allison

The
linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the
link points to the correct file and location.

ALLISON VAN HEUGTEN
Project Manager

+1 (361) 728-5964
706 S. Hill St. #1060
Los Angeles, CA 90014

CONNECT-HOMES.COM
From: Brian Gengler <[email protected]>
Sent: Thursday, June 23, 2022 10:42 AM
To: Allison van Heugten <allison@connect‐homes.com>
Cc: Stephan Longoria <[email protected]>; Ed Herrera <[email protected]>; Luis Diaz <[email protected]>; Sal Torres <[email protected]>; Rick Hernandez <[email protected]>
Subject: Connect Homes Transportation

Allison,

Do you know when the first units will need to be transported to a storage site?

Thanks

1318
4 1319

4.00 Contractor's Price Proposal - Summary
Owner PO #:

Victorville W
ellness Center, phase 1 - supplemental #4
102420.04
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Title:

Re:

July 06, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$222,388.87
$222,388.87Transport 46 Units of Modular Shelter to SCLA Proposal Total
Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$222,388.87
The Percentage of NPP on this Proposal: %

Page 1 of 1 ends

7/6/2022
Contractor's Price Proposal - Summary
1320

5.00 Contractor's Price Proposal - Detail
Victorville W
ellness Center, phase 1 - supplemental #4
102420.04
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 06, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$222,388.87
(Excludes)Equip. MaterialLabor
Line TotalDescriptionUOMMod.ItemSect.

Transport 46 Units of Modular Shelter to SCLA
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal.
1 $4,787.23
EA
Installation =x x 4,787.23
FactorUnit PriceQuantity Total

1.00 1.1000 4,352.03
Supplemental #4 Bond Fees [$217,601.64 x 2%]
01 22 20 00 0027 LaborerFor tasks not included in the Construction Task Catalog® and as
directed by owner only.
2 $26,902.95HR
Installation =x x 26,902.95
FactorUnit PriceQuantity Total

81.97 1.2432 264.00
Rigger/Laborer Crews for setting up and unloading 46 each shelter units at storage facility in Southern California Logistics
Airport [24 man-hours per delivery day x 11 days = 264 hours] 01 22 20 00 0086 Pilot Vehicle With DriverIncludes radio, "Follow Me" sign, "Wait For Pilot Car" signs on barricades where required.
3 $25,772.01
DAY
Installation =x x 25,772.01
FactorUnit PriceQuantity Total
942.29 1.2432 22.00
Escort vehicles for the delivery of 46 shelter units [46 each ÷ 4 units per day =1 1 days x 2 escorts = 22]
01 22 20 00 0087 Flagperson For Traffic Control4 $8,967.65HR Installation =x x 8,967.65
FactorUnit PriceQuantity Total

81.97 1.2432 88.00
flag person [8 man-hours per day x 1
1 days]
01 22 23 00 0984 100 To 110 Ton Lift, Truck Mounted Hydraulic Crane With Full-Time Operator5 $36,452.07DAY Installation =x x 36,452.07
FactorUnit PriceQuantity Total
2,665.56 1.2432 1 1.00
Rental crane for unloading 46 each shelter units at storage facility in Southern California Logistics Airport for 11 days based on Connect Homes production schedule and pick up timeline 01 22 23 00 1432 Tractor, Truck, Diesel Powered, 6x4, 75000 GVW, 400 HP, With Full Time Truck Driver
6 $69,580.81
DAY
Installation =x x 69,580.81
FactorUnit PriceQuantity Total
1,216.72 1.2432 46.00
Closest CTC task item equivalent to Shelter units delivery on 53' Step Deck-tractor/trailer, non-hydraulic, frame and/or toter equipment [46 each modular shelter units delivery x 1 trailer each shelter unit per day] 01 54 23 00 0056 2" x 12" T
emporary Lumber7 $2,973.73LF
Installation =x x 2,973.73
FactorUnit PriceQuantity Total

6.50 1.2432 368.00
provide 4 points of transportation cribbing with 2"x12"x24" lumber pads at Connect Homes manufacturing facility [4 ea x 2' x 46 units = 368 LF]

Page 1 of 2 ends

7/6/2022
Contractor's Price Proposal - Detail
1321
Contractor's Price Proposal - Detail Continues..

Work Order Title:

Work Order Number: 102420.04
Victorville W
ellness Center, phase 1 - supplemental #4
Transport 46 Units of Modular Shelter to SCLA
01 54 23 00 0061 4" x 6" T
emporary Lumber8 $12,908.29LF
Installation =x x 12,908.29
FactorUnit PriceQuantity Total

6.27 1.2432 1,656.00
Provide 4" x 6" x 12' lumber for 3 points cribbing/dunnage or support under modular for storage on the ground at SCLA
yard required by Connect Homes [3 ea x 12' x 46 units = 1,656 LF] 01 71 13 00 0011 >110 To 125 Ton Lift Move On/Off Cost, Hydraulic CraneIncludes delivery and pickup.
9 $27,235.25
EA
Installation =x x 27,235.25
FactorUnit PriceQuantity Total
1,991.58 1.2432 1 1.00
1 each crane mobilize and de-mobilize per delivery schedule to storage facility in Southern California Logistics Airport x 11 each mobilization period for 46 each modular shelter units based on Connect Homes production schedule and pick up timeline
01 71 13 00 0011 0043 For >30 To 60 Miles Radius, Add10 $6,808.88 MOD
Installation =x x 6,808.88
FactorUnit PriceQuantity Total
497.90 1.2432 1 1.00
$222,388.87Subtotal for Transport 46 Units of Modular Shelter to SCLA Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding.
$222,388.87
The Percentage of NPP on this Proposal: %

Page 2 of 2 ends

7/6/2022
Contractor's Price Proposal - Detail
1322
Subcontractor Listing
102420.04
Victorville W
ellness Center, phase 1 - supplemental #4
CA-R8-GB06-123021-ACIIQC Master Contract #:

Work Order #:

Owner PO #:

Title:

Re:

July 06, 2022Date:

Proposal V
alue:

Contractor: Angeles Contractor Inc.
$222,388.87
%DutiesName of Contractor Amount
No Subcontractors have been
selected for this Work Order

0.00$0.00

6.00

Page 1 of 1 ends

7/6/2022
Subcontractor Listing
1323

ATTACHMENT B

1324
1 FIRST AMENDMENT TO COOPERATIVE AGREEMENT: CONSTRUCTION OF

NEW SEWER INTERCEPTOR IMPROVEMENTS BETWEEN THE

CITY OF VICTORVILLE

AND THE VICTOR VALLEY

WASTEWATER RECLAMATION AUTHORITY
This
First Amendment to the Cooperative Agreement : Construction of New Sewer Interceptor Improvements (“Amendment”) is entered into as July __, 2022, between City, a California municipal corporation and charter city (“City”), and the Victor Valle y Wastewater Reclamation Authority, a joint powers authority located in the County of San Bernardino (hereinafter referred to as “VVWRA”).

WHE
REAS, on or about March _, 2022, City and VVWRA entered into that certain Cooperative Agreement: Construction of New Sewer Interceptor Improvements (“Original Agreement”); and
WHE
REAS, it is the desire of the City and VVWRA to amend certain sections of the Original Agreement; and
WHE
REAS, VVWRA and City deem it best to amend the Original Agreement at this time.

NOW
, THEREFORE, for the valuable mutual consideration set forth in this Amendment, the receipt and sufficiency of which is hereby acknowledged, City and VVWRA hereby agree to amend the Original Agreement as follows:

1. Amen
dment. The first sentence of Section 5 of the Original is hereby amended to read:

Secti
on 5. VVWRA agrees to reimburse Victorville for the cost of construction of the Project in an amount not to exceed Nine Hundred Fifty Two Thousand, Five Hundred Eighty One Dollars and Sixty Eight Cents ($893,895.73.)

2. Mis
cellaneous Provisions Applicable to Amendment.
a) This Amendment will be effective as of the date first written above. b) This Amendment may be executed in multiple counterparts, each of which shall be deemed an original, but all of which, together, shall constitute but one and the same instrument. c) This Amendment shall be governed by the law of the State of California, without reference to its choice of law rules.
d) Unless otherwise defined in this Amendment, all terms used in this Amendment that are defined in the Original Agreement are used here as they are there defined. e) Except for the underlying Agreement, this Amendment supersedes any prior agreements, negotiations and communications, oral or written, with respect to this subject matter.

3. St
atus of Agreement. As amended by this Amendment, the Original Agreement continues in full force and effect in accordance with its terms.
1325

2 IN WITNESS WHEREOF, the undersigned have executed this instrument that day and year written above, in the City of Victorville, California.

CITY OF VICTORVILLE VICTOR VALLEY WASTEWATER

RECLAMATION AUTHORITY
By: ___________________ By: __________________ Name: _________________ Name: ________________
Title: __________________ Title: _________________
Date: _____________ Date: _____________

ATTEST: ATTEST:

____________________ ____________________
City Clerk
Date: _______________ Date: _______________

APPROVED AS TO FORM APPROVED AS TO FORM

____________________ ____________________
City Attorney Authority Counsel
Date: _______________ Date: _______________

P:\APPS\WPDATA\VVCA\0014\DOC\108.1 Amendment 1 VVWRA coop agreement v2 draft 1326
Item Number: 18
City Council / Board of Directors
Written Communications
Meeting of: July 19, 2022
Submitted By:

Brian Gengler, City Engineer
Subject:

Initiate the Annexation of Tract No. 20275 into Drainage Facilities Assessment District No. 1 and Landscape Maintenance Assessment District No. 6 Recommendation:

That the City Council:
(1) Approve Resolution No. 22-031 to initiate proceedings to annex Tract No. 20275 into Drainage Facilities Assessment District No. 1;
(2) Approve Resolution No. 22-062 to initiate proceedings to annex Tract No. 20275 into Landscape Maintenance Assessment District No. 6;
(3) Approve Resolution No. 22-063 to preliminarily approve the Drainage Facilities Assessment District No. 1 Engineer’s Report;
(4) Approve Resolution No. 22-071 to preliminarily approve the Landscape Maintenance Assessment District No. 6 Engineer’s Report; and
(5) Approve Resolution Nos. 22-072 and 22-073 setting a public hearing date of September 6, 2022.

Fiscal Impact:

There is no fiscal impact associated with the approval of resolutions listed above.

Maintenance and servicing of the drainage and landscaping improvements in future years will be covered by the subsequent annual assessments levied on these and other properties within the boundaries of their assigned districts.

Background:

The property owner for Tract Map No. 20275 (Tract 20275) has petitioned the City to annex the tract into the City-Wide Drainage Facilities Assessment District No. 1 (DFAD 1) and the Landscape Maintenance Assessment District No. 6 (LMAD 6) in order to comply with the Conditions of Approval for Tract 20275. Tract 20275 is located at the southeast corner of Monte Vista Road and Luna Road. Tract 20275 is a proposed 135- lot single-family subdivision that includes drainage and landscaping improvements within 1327
2 6
9 4
the tract. This annexation will provide for the perpetual maintenance and servicing of the drainage and landscape improvements by means of a new annual assessment to each property within Tract 20275.

Discussion:

The City formed DFAD 1 and LMAD 6 pursuant to the Landscaping and Lighting Act of 1972, Streets and Highways Code section 22500 et seq. (the Act); the applicable provisions of Proposition 218 (Article XIIID of the California Constitution, hereinafter referred to as the “California Constitution”); and Government Code section 53753, part of the Omnibus Act.

DFAD 1 and LMAD 6 allows the City to collect assessments for maintaining and servicing the drainage and landscaping improvements within these districts. Assessments are levied and collected annually according to the special benefits received by properties from the improvements provided by the City. The formation documents of DFAD 1 and LMAD 6 contain a mechanism permitting the annual assessment amount to be adjusted from time to time, commensurate with increases in the costs to maintain the drainage and landscaping improvements.

A public hearing regarding the amount of the assessments is conducted annually by the City Council. In accordance with the special benefit calculation contained in the annual Engineer’s Report, the total assessments for DFAD 1 and LMAD 6 are equally distributed amongst all the parcels within the district boundaries. The current annual assessment amounts per parcel are $204.21 for DFAD 1 and $144.70 for LMAD 6. Both districts are adequately funded to perform all required maintenance and servicing of the proposed improvements for Tract 20275.

Sections 22605 through 22613 of the Act, as amplified by the California Constitution and Government Code section 53753, provide procedures for annexation of new territory into an existing assessment district. In order for Tract 20275 to become subject to the annual assessments applicable to DFAD 1 and LMAD 6, and to receive the level of perpetual maintenance provided to other properties within those assessment districts, annexation to DFAD 1 and LMAD 6 is required.

For this annexation to occur, the City Council must approve a series of eight resolutions at two City Council meetings. Resolutions Nos. 22-031 and 22-062 will initiate annexation, request the City Engineer’s Reports, and file with the City Clerk for City Council consideration. The Engineer’s Reports are required by the Act and include the estimated costs of the annexation, a description of the improvements and special benefits to be received by the parcels, a determination of the estimated amounts of the assessments to be levied upon the properties proposed to be annexed, an annexation map, and other information as required by Article 4 (commencing with section 22565) of the Act and the California Constitution, as amplified by Government Code section 53753.

If the aforementioned resolutions are approved, the Engineer’s Reports would be preliminarily approved by Resolution Nos. 22-063 and 22-071, which would also declare 1328
2 6
9 4
the City Council’s intent to annex Tract 20275 to DFAD 1 and LMAD 6. At this same meeting, a fifth and sixth resolution will also need to be approved by the City Council to set a public hearing of September 6, 2022 and order the mailing of the public hearing notices and assessment ballots to the property owners within Tract 20275, no less than 45 days prior to said public hearing.

During the September 6, 2022 meeting, the City Council would then conduct the public hearing and count the assessment ballots submitted. If at the end of the public hearing, the ballots cast in favor of the annexation exceed the ballots cast in opposition, the City Council may proceed to annex Tract 20275 to DFAD 1 and LMAD 6, approve the Engineer’s Reports for each assessment district, order the assessments to be levied, and complete the subsequent annexations by approving the final resolutions.

Therefore, staff recommends that the City Council approve Resolution No. 22-031 to initiate proceedings to annex Tract 20275 into DFAD 1 and Resolution No. 22-062 to annex into LMAD 6, approve Resolution Nos. 22-063 and 22-071 to preliminarily approve both districts Engineer’s Reports, and approve Resolution Nos. 22-072 and 22-073 setting a public hearing date of September 6, 2022.

Staff remains available for any questions Council may have.

Attachments: A. Vicinity Map
B. Engineer’s Reports
C. Resolution No. 22-031
D. Resolution No. 22-062
E. Resolution No. 22-063
F. Resolution No. 22-071
G. Resolution No. 22-072
H. Resolution No. 22-073
I. Petitions from Developers
1329

Attachment A
Vicinity Map

1330

Tract No. 20275

1331

Attachment B
Engineer’s Reports
1332

City of Victorville

Engineer’s Report
Drainage Facilities Assessment
District No. 1
Annexation of Tract No. 20275

Commencing Fiscal Year 2022/2023

Intent Meeting: July 19, 2022
Public Hearing: September 6, 2022
Updated: July 2022

27368 Via Industria
Suite 200
Temecula, CA 92590
T 951.587.3500
F 951.587.3510

www.willdan.com/financial
1333

ENGINEER'S ANNEXATION REPORT AFFIDAVIT
City of Victorville
Drainage Facilities Assessment District No. 1
Annexation of Tract No. 20275
Commencing in Fiscal Year 2022/2023
City of Victorville,
San Bernardino County, State of California

As part of the Resolution of Intention packet presented for the consideration of the Victorville City Council, this Report and the enclosed budget, diagram, and description outline specific proposed changes to the Drainage Facilities Assessment District No. 1 for fiscal year 2022/2023 , including the annexation of Territory to the District; the expansion of the improvements to be maintained within the District, and the proposed annual assessments for all parcels within the Annexation Territory commencing in Fiscal Year 2022/2023.

Reference is hereby made to the San Bernardino County Assessor’s Parcel Map for a detailed description of the lines and dimensions of the parcel, annexation territory known as Tract No. 20275 that will be subject to the proposed annual assessment.

The undersigned respectfully submits the enclosed Report as directed by the City Council.

Dated this ______ day of____________, 2022.

By: _____________________________
Brian Gengler, City Engineer
R.C.E No. 44730

Willdan Financial Services
Assessment Engineer

By: ________________________________ By: ____________________________ Stacee Reynolds Tyrone Peter
Senior Project Manager PE # C81888

I HEREBY CERTIFY the enclosed Engineer’s Report, together with Assessment Roll and Assessment Diagram thereto attached, was filed with me on the _____day of________, 2022.

By: ____________________________
City Clerk, City of Victorville
County of San Bernardino, California

I HEREBY CERTIFY the enclosed Engineer’s Report, together with Assessment Roll and Assessment Diagram thereto attached, was approved, and confirmed by the City Council of the City of Victorville, California, on the _____day of________, 2022.

By: ____________________________
City Clerk, City of Victorville
County of San Bernardino, California
1334

Table of Contents
INTRODUCTION ....................................................................................................................... 1 DRAINAGE FACILITIES ASSESSMENT DISTRICT NO. 1 ............................................................. 1 HISTORICAL BACKGROUND .................................................................................................... 2 ANNEXATION TERRITORY ........................................................................................................ 2 PROCEEDINGS AND REPORT CONTENT .................................................................................. 3 Ballot Proceedings ......................................................................................................... 3 Report Content ............................................................................................................. 4 PART I — PLANS AND SPECIFICATIONS ...................................................................................... 6 DESCRIPTION OF THE DISTRICT .............................................................................................. 6 EXISTING TRACTS IN DISTRICT ................................................................................................ 7 ANNEXATION TERRITORY/IMPROVEMENTS FISCAL YEAR 2022/2023 ....................................... 8 Tract No. 20275 ............................................................................................................ 8 PART II — METHOD OF APPORTIONMENT .................................................................................... 9 LEGISLATIVE REQUIREMENTS FOR ASSESSMENTS ................................................................ 9 BENEFIT ANALYSIS ................................................................................................................. 9 Landscaping Special Benefit ............................................................................................ 9 Landscaping General Benefit ......................................................................................... 10 ASSESSMENT METHODOLOGY .............................................................................................. 10 Exempt Properties ....................................................................................................... 11 Annual Inflationary Adjustment (Assessment Range Formula) ................................................ 11 PART III — ESTIMATE OF COSTS................................................................................................ 13 PROPOSED BUDGETS AND ASSESSMENTS ........................................................................... 13 Annexation Territory Budget Fiscal Year 2022/2023 ............................................................ 14 PART IV — BOUNDARY DIAGRAM .............................................................................................. 15 PART V — ASSESSMENT ROLL .................................................................................................. 17 1335
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 1 ends

Introduction
The City of Victorville (“City”), under the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (“1972 Act”) established the assessment district designated as:

DRAINAGE FACILITIES ASSESSMENT DISTRICT NO. 1
(hereinafter referred to as “ DFAD No. 1 ” or “District”). Pursuant to the provisions of the 1972 Act and in compliance with the substantive and procedural requirements of Article XIIID of the California State Constitution (the “California Constitution”), the City Council of the City of Victorville (“City Council”), proposes to annex Tract No. 20275, expanding the improvements to be provided and maintained within the DFAD No. 1, and to conduct a protest ballot proceeding for special benefit assessments to be levied and collected annually on the parcels within the Annexation Territory in order to fund in whole or in part the maintenance and operation of certain public improvements that may include, but is not limited to landscape crews, basins and appurtenant facilities that provide special benefits to those properties commencing in Fiscal Year 2022/2023.

As required pursuant to Chapter 1, Article 4 of the 1972 Act, this Drainage Facilities Assessment District Engineer’s Report (“Report”) shall serve as the detailed engineer’s report for the annexation of Territory to Drainage Facilities Assessment District No. 1, for Tract No. 20275 (hereafter referred to as the, “Annexation Territory”) and the establishment of annual assessments to be levied and collected upon properties within the proposed Annexation Territory in connection with the special benefits each property receives from the maintenance and servicing of the improvements to be provide d by the C ity through the District. The assessments described herein will provide an annual funding source to adequately support the ongoing maintenance, servicing, operation, and incidental expenses associated with the drainage landscaping and irrigation improvements, and appurtenant facilities and amenities that benefit the identified properties within the Annexation Territory. The Annexation Territory as shown on the diagram contained in Part IV of this Report, encompass all lots and parcels of land within a defined area of the City that will receive special benefits from the ongoing servicing, maintenance, operation, and incidental expenses associated with the improvements to be funded by the assessments. Parcels within the Annexation Territory will be assessed for their proportionate special benefit of the shared drainage landscaping and irrigation improvements and appurtenant facilities.

The City Council of the City of Victorville adopted its General Plan with various elements to provide guidelines for o rderly development of property within the City . The City Council further adopted ordinances and regulations governing the development of land providing for the installation and construction of certain landscaping and appurtenant facilities to enhance the quality of life and to benefit the value of property.

The requirement for the installation of landscaping, streets and appurtenant facilities is a condition of development provided for in the City's Subdivision Ordinance and is a requirement fo r issuance of a permit for construction of commercial, residential, and planned unit development. These improvements generally include but are not limited to street lights and related equipment and fixtures; various landscape materials such as trees, turf, shrubs, vines, and ground cover; irrigation and drainage systems; structural amenities such as monuments, block walls, retaining walls, or other fencing; hardscapes including mulch, trail and path surfaces, stamped concrete and pavers; recreational amenit ies such as benches, picnic facilities, play structures; signage, and related appurtenances.

The installation of landscaping and appurtenant facilities is the responsibility of the sub-divider or other development/applicant, triggered by the approval of a tentative subdivision map or other development 1336
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 2 ends

application. After installation, it is City policy that the servicing, operation, maintenance, repair, and replacement of landscaping and appurtenant facilities in turn become the fiscal responsibility of the properties that specially benefit from the facilities.

HISTORICAL BACKGROUND
The residential subdivision plans for the tracts within DFAD No. 1 were submitted to the City by developers and were approved with certain conditions. One such condition required a means to fund the perpetual maintenance of landscaping within the public right-of-ways and dedicated easement areas. In order to meet this con dition, the developer, as sole -owner of the subdivision property, petitioned the City to form an assessment district. The DFADs were formed by City Council Resolutions in accordance with the Landscape and Lighting Act of 1972, which is Part 2, Division 15 of the California Streets and Highways Code, in order to provide a funding source for the administration, operations and maintenance, and servicing of the landscaping within the District. Each parcel within the DFADs is assessed at a rate equitable to the budget, not exceeding the maximum allowable rate. Future improvement parcels are assessed $1.00 annually until such time the improvements are constructed.

In 2003, Drainage Facilities Assessment District No. 1 was formed by Resolutions 03 -046, 03-047, 03-048 and 03-049. As of Fiscal Year 2022/23, there are thirty-two (32) tracts, and several unimproved parcels of vacant land in the District. Existing drainage facilities improvements are 566,998.40 square feet to include detention basins, drainage channels and perimeter landscaping that is located throughout the City.

ANNEXATION TERRITORY
The Annexation Territory consists of all lots and parcels of land within the planned development identified as Tract No. 20275 which will develop out to 135 residential units.

This Report has been prepared pursuant to the provisions of the California Constitution and the 1972 Act and shall serve as the detailed engineer’s report regarding the annexation of the designated Annexation Territory into the Victorville Drainage Facilities Assessment District No. 1. The proposed assessments will be levied on the properties therein commencing in Fiscal Year 2023/2024 for the proportional special benefits the properties will receive from the ongoing maintenance and servicing of the improvements associated with and/or resulting from the development of properties within the Annexation Territory.

The City Council proposes to annex the Annexation Territory into the District as Tract No. 20275, and to levy and collect annual special benefit assessments on the County tax rolls to provide ongoing funding for the direct expenditures, incidental expenses, and fund balances that are necessary to service and maintain the landscaping improvements associated with and resulting from the development of property within the Annexation Territory. The improvements described in this Report for the Annexation Territory are based on the initial improvement and development plans for Assessor Parcel Number 3133-111-01-0000 and by reference those plans, and specifications are made part of this Report.

The estimated budget provided herein is based on the City’s estimate of the Annexation Territory expenses for local improvements and services in the Annexation Territory. The resulting annual assessments a re calculated utilizing the method of apportionment established under Part II Method of Apportionment and are made pursuant to the 1972 Act and the substantive and procedural provisions of the California Constitution.

The word “parcel,” for the purposes of this Report, refers to an individual property assigned its own Assessor’s Parcel Number (APN) by the San Bernardino County Assessor’s Office. The San Bernardino County 1337
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 3 ends

Auditor/Controller uses Assessor’s Parcel Numbers and specific Fund Numbers to identify properties to be assessed on the tax roll for the special benefit assessments.

PROCEEDINGS AND REPORT CONTENT
This Report specifically addresses the proposed annexation of Territory, the resulting boundary change, the various improvements within the Tract, and the proposed assessment to be levied in connection with the special benefits the properties will receive from the maintenance and servicing of the improvements based on the estimated operating and maintenance expenses. The proposed annual assessments to be levied on properties within the Annexation Territory will provide a source of funding for the continued operation , maintenance, and servicing of the landscaping and appurtenant facilities (collectively referred to as improvements) to be provided by the District for the special benefit of properties within the Tract.

The District assessments as described herein are based on the City’s estimate of the costs to maintain, operate and service the improvements. The costs of the improvements and the proposed annual assessments budgeted and assessed against properties within the Annexation Territory may include, but are not limited to the estimated expenditures for regular annual maintenance and repairs; incidental expenditures related to the operation and administration of the District; deficits or surpluses from prior years; revenues from other sources; and the collection of funds for operational reserves and/or periodic repairs, replacements and rehabilitation projects as authorized by the 1972 Act. The net annual cost to provide the improvements for each Tract are allocated to the benefiting properties within that Tract using a weighted method of apportionment (refer to Assessment Methodology in Section II, Method of Apportionment) that calculates the proportional special benefit and assessment for each parcel as compared to other properties that benefit from the District improvements and services. Thus, e ach parcel is assessed proportion ately for only those improvements, services, and expenses for which the parcel will receive special benefit.

Ballot Proceedings
As part of these proceedings, the City shall conduct a property owner protest ballot proceeding (“Ballot Proceeding”) for the proposed levy of an assessment pursuant to the provisions of the California Constitution, Article XIIID Section 4 , and in accordance with the provisions of Government Code, Section 53753 . In conjunction with this Ballot Proceeding, the City Council will conduct a noticed public hearing to consider public testimonies, comments and written protests regarding the annexation, and the assessments described herein. Upon conclusion of the public hearing, property owner protest ballots received will be opened and tabulated to determine whether majority protest exists as defined in Article XIIID of the California Constitution.

As specified by the California Constitution, Article XIIID Section 4e:
“A majority protest exists if, upon the conclusion of the hearing, ballots submitted in opposition to the assessment exceed the ballots submitted in favor of the assessment. In tabulating the ballots, the ballots shall be weighted according to the proportional financial obligation of the affected property.” After completion of the ballot tabulation, the City Council will confirm the results of the balloting. If majority protest exists for the proposed Tract No. 20275 assessments, further proceedings to annex the parcels within the District and implementation of the Tract and assessments shall be abandoned.

If tabulation of the ballots indicate that majority protest does not exist for the proposed assessments and the assessment range formu la presented and described herein, the City Council by resolution may adopt this Report (as submitted or amended); approve the assessment diagrams (Tract Boundary Diagram) contained 1338
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 4 ends

herein; order the annexation of the parcels within DFAD No. 1 and the improvements to be made; and confirm the assessments as outlined in this Report.

The assessments as approved, may be levied and collected on the County tax rolls commencing in Fiscal Year 2023/2024 and may be handbilled in Fiscal Year 2022/2023 . For Fiscal Year 2023/2024 and each subsequent fiscal year, this tract will be included in the Annual Consolidated Drainage Facilities Assessment District Report, which shall be prepared and presented to the City Council to address any proposed changes, including Tract No. 20275, as well as any proposed changes to the improvements, budgets, and assessments for that fiscal year. The City Council shall hold a noticed publi c hearing regarding these matters prior to approving and ordering the levy of annual assessments for the District.

If in any fiscal year, the proposed annual assessments for parcels with the District exceed the maximum assessments described herein, such a n assessment would be considered an increased assessment and must be confirmed through a mailed property owner protest ballot proceeding for the affected parcels before the increased assessment may be imposed.

Report Content
This Report has been prepared i n connection with the annexation of an individual parcel into DFAD No. 1 and the resulting assessment for the parcel within Tract No. 20275 established herein in connection with the annexation of Territory for Fiscal Year 2022/2023, pursuant to a resolution of the City Council and consists of five (5) parts:

Part I — Plans and Specifications
Contains a general description of the District and tract of benefit (“ Tract”), and specifically addresses the improvements and services that provide special benefits to the parcels within the Annexation Territory which include, but is not limited to local landscaping, and related amenities including operational expenses and fund balances authorized by the 1972 Act. The plans and specifications contained in this Report generally describe the nature and extent of the improvements. In conj unction with these general descriptions of the improvements a visual depiction of the improvements is provided in the Tract Boundary Diagram contained in Part IV of this Report. The detailed plans and specifications for the improvements in the Annexation Territory are on file in the Public Works Department of the City of Victorville and by reference are made part of this Report.

Part II — Method of Apportionment
Outlines the special and general benefits associated with the improvements to be provided within the Annexation Territory, and the basis upon which the estimated costs to provide such improvements has been apportioned to each parcel of land therein in proportion to the special benefits to be received.

Part III — Estimate of Costs
Identifies the estimated annual funding costs (Budget) required for the maintenance and operation of the improvements including, but not limited to, annual maintenance and service expenses, utility costs, related incidental expenses, and fund balances authorized by the 1972 Act and deemed appropriate to fully support the improvements. Those improvements and/or costs determined to be of general benefit shall be funded by a City contribution. This budget establishes the maximum assessments to be approved by t he property owner(s) of record within the Annexation Territory as part of the Ballot Proceeding. 1339
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 5 ends

This section also identifies and outlines an Assessment Range Formula (inflationary adjust ment) that provides for an annual adjustment to the maximum assessme nt rate that establishes limits on future assessments, but also provides for reasonable cost adjustments due to inflation.

Part IV — Boundary Diagram
A diagram showing the existing District and Annexation Territory. The lines and dimensions of each lot, parcel, and subdivision of land contained in this diagram are inclusive of all parcels listed in “Part V – Assessment Roll” of this Report and the corre sponding County Assessor’s Parcel Maps for said parcels as they existed at the time this Report was prepared and shall include all subsequent subdivisions, lot -line adjustments, or parcel changes therein. Reference is hereby made to the San Bernardino County Assessor’s maps for a detailed description of the lines and dimensions of each lot and parcel of land within Annexation Territory.

Part V — Assessment Roll
The “Balloted Maximum Assessment” amount for each parcel represents that parcel’s proposed maximum assessment amount for each parcel within Tract No. 20275 commencing in fiscal year 2022/2023 and is based on the parcel’s calculated proportional special benefit as outlined in “Part II — Method of Apportionment”, and calculated assessment rate established by the budget in “Part III —Estimate of Costs”.

If any section, subsection, sentence, clause, phrase, portion, or tract of this Report is, for any reason, held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining provisions of the Report and each secti on, subsection, subdivision, sentence, clause, phrase, portion, tract thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases, portions, or tract might subsequently be declared invalid or unconstitutional.
1340
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 6 ends

Part I — Plans and Specifications

DESCRIPTION OF THE DISTRICT
The purpose of this District and specifically the Annexation Territory is to provide in part through annual assessments, funding for the ongoing operation, maintenance, and servicing of drainage landscaping and irrigation improvements, and related appurtenant facilities and services in specified areas of the City. The territory within the District consists of those lots or parcels of land within the City of Victorville for which the City, through the District maintains these local improvements and related amenities installed in connection with the development of those properties and for the benefit of those lots or parcels.

As authorized by the 1972 Act, the improvements provided by the District and associated with each Tract incorporate various local and related amenities installed in connection with the development of those properties and are maintained and serviced for the benefit of real property within that Tract. The maintenance of the improvements may also include various appurtenances including, but not limited to block walls, retaining walls or other fencing, trail and p ath surfaces, stamped concrete, pavers, mulch or other hardscapes, irrigation and related electrical equipment and drainage systems, benches, play structures, picnic or other recreational facilities, monuments, signage, ornamental lighting, street lighting , and related equipment. The work to be performed within the respective Tract may include but is not limited to (as applicable), the personnel, materials, equipment, electricity, water, contract services, repair and rehabilitation of the improvements and incidental expenses required to operate the District and provide the improvements and services.

Improvements provided within the District may include but are not limited to:
➢ Landscaping and related facilities and amenities located within or around the designated drainage facility.

These improvements may include, but are not limited to:
• various landscape materials such as trees, turf, shrubs, vines, ground cover, annual or per ineal plantings;
• irrigation and drainage systems such as storm drains, channels, and basins; • structural amenities such as monuments, block walls, retaining walls, or other fencing; • hardscapes including mulch, trail and path surfaces, stamped concrete, and pavers; The maintenance of these improvements may include, but is not limited to the regularly scheduled mowing, trimming, pruning, fertilization, pest control, weed and graffiti abatement; installation, replacement and rehabilitation of the landscaping, repair or replacement of irrigation or drainage systems; repair or replacement of hardscape improvements and recreational amenities. The City’s Public Works Department shall authorize and schedule such maintenance and servicing as need and based on available funding.
1341
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 7 ends

EXISTING TRACTS IN DISTRICT
In accordance with the 1972 Act, the District utilizes Tracts to address variations in the nature, location, and extent of the improvements that provide special benefits to parcels in the District. Each Tract is associated with specific improvements and/or types of improvements that provide special benefit to properties within that Tract. The boundaries of each Tract are based on the improvements to be maintained and the relationship and proximity of the developments and properties that derive special benefits from those specific improvements.

As of Fiscal Year, 2021/2022 the District was comprised of the following Tracts and developments:

1342
Victorville Drainage Facilities Assessment District No. 1 Engineer’s Report
Annexation of Tract No. 20275
Fiscal Year 2022/2023

Page 8 ends