2.28.100 Purchases of general services or supplies and equipment with an estimated cost in excess of fifty thousand dollars.
(a) Bidding requirement. The city manager shall solicit bids for supplies and equipment and general services with an estimated cost in excess of fifty thousand dollars per single transaction or term agreement by following the formal bid procedure prescribed in this section.
(1) Notice inviting bids. The notice inviting bids shall include a general description of the supplies and equipment or general services to be purchased, and shall state where bid forms and specifications may be secured, and the final time and place for submitting bids. (A) Published notice. The notice inviting bids shall be published at least one time, ten calendar days before the date of opening of the bids in a newspaper(s) of general circulation, printed and published locally. The city manager may also give such additional notice as he/she deems appropriate.
(B) Bidder's list. The city manager shall also solicit sealed bids from responsible prospective suppliers whose names are on the city's bidder's list.
(2) Bid opening procedure. Bidders shall submit sealed bids to the city manager or such department head as may be identified in the notice inviting bids, and shall identify them as bids on the envelope in accordance with the notice inviting bids. Invitations for bids shall require a bid opening at a desi gnated place, date and time when the city clerk, or his or her designee, shall publicly open. (3) Rejection of bids. In its discretion, the city council may reject any and all bids presented, and may re - advertise for bids in the event all bids are rejected.
(4) Reserved.
(5) No bid/no responsive bid. If no bid, or no responsive bid is received after inviting bids under this section, the city manager may proceed to procure the general services or purchase the supplies and equipment in the open market.
(6) Award of contract. The city council shall have the authority to award a contract for purchase of supplies and equipment or general services with a cost in excess of fifty thousand dollars. If responsive and responsible bids are received, the city council shall make award of the contract to the best value bidder, even if such bidder did not submit the lowest monetary bid. The factors from section 2.28.040 upon which the award was based shall be set forth in writing. (b) Exceptions. The bidding procedures under this section may be dispensed with:
(1) In the event the city council determines the existence of an emergency as defined in subsection
2.28.050(6) and provided such procurement is made in accordance with the applicable provisions of subsection 2.28.060(f);
(2) Where it is determined by the city council that such procurement constitutes a sole source purchase.
The basis upon which this determination is made shall be prepared by the city manager in writing and presented to the city council for approval using the city's sole-source justification form; (3) Where the general services, supplies or equipment are purchased through a cooperative purchasing arrangement pursuant to section 2.28.120; and
(4) Where supplies and equipment or general services are purchased through competitive or noncompetitive negotiations pursuant to section 2.28.110. (Ord. No. 2381 , § 2, 9-18-18)
Attachment C
Municipal Code §2.28.040
Created: 2022-03-30 15:03:38 [EST]
(Supp. No. 49)
2.28.040 Evaluation of best value bidder.
(a) For purposes of evaluating whether a bidder is the "best value bidder" pursuant to this chapter, the city council or the city manager, as applicable, shall take into consideration all of the following factors which are applicable to any bid:
(1) Price;
(2) The bidder's ability, capacity and skills to provide the goods and/or services in accordance with bid specifications;
(3) The bidder's ability to provide the goods and/or services promptly, or within the time specified, without delay or interference;
(4) The bidder's equipment, facilities, location and resource capacity to provide the goods and/or services; (5) The bidder's ability to provide future maintenance, repair, parts and service for the use of the goods purchased or facility constructed, if appropriate;
(6) The bidder's favorable record of performance under prior contracts with the city (if any) and other purchasers where such bidder has previously been awarded such contracts; (7) The bidder's favorable record of compliance with laws, regulations, guidelines and orders governing prior or existing contracts performed by the bidder, if applicable; (8) The bidder's experience, integrity, judgment, reputation and financial resources enabling it to perform the work according to the specifications and terms of the solicitation and the city's contractual requirements;
(9) The bidder's demonstration of the quality and performance of the supplies to be purchased or services to be provided;
(10) The number and scope of any conditions/limitations atta ched to the bidder's bid; and (11) Any other relevant factor(s) which demonstrate the value of the bid and furthers best interests of the city in procuring the supplies or services sought.
(b) The city council or city manager, as applicable, shall have absolute discretion in determining the applicability and relative weight of any or all of the factors set forth in this section and are not required to award a contract to the lowest monetary bidder.
(Ord. No. 2381 , § 2, 9-18-18)
Item Number: 17
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Joe Slegers, Building Official
Subject:
Contract with Rite-Way Roofing Corporation - Transportation Center Re-Roof Project Recommendation:
That the City Council award a contract to Rite-Way Roof Corporation in the amount of $155,206.00 for the Transportation Center Re-Roof, Project CC23-063.
Fiscal Impact:
This project was approved and included in the Fiscal Year 22/23 Annual Budget and will be funded by Special Revenue Fund (Fund 470), Victorville Transportation Center Funds (4705403-55060-81016). The project funds initially came from the General Fund and moved over to the new Special Revenue Fund 470. An interfund short-term loan will be initiated at the upcoming mid-year budget process to pay back the General Fund over a five-year term. The revenue for this fund is generated from a lease agreement with Victor Valley Transit Authority. The budget for this project is $265,000.00. Acting in accordance with the staff recommendation will result in a fiscal impact of $155,206.00.
Strategic Plan Goal:
The City of Victorville Strategic Plan 2020-2023 identifies multi-year strategic goals and various strategies to work toward achieving those goals. Goal E, Invest in Infrastructure, focuses on creating a healthy and livable community by maintaining the city’s assets through investment in infrastructure and innovations.
Background:
The Facilities Division has established a list of City facilities in need of roof repairs and has been making progress with restoration projects as funding permits. The roof at the Transportation Center, located at 16838 D St, was identified next priority due to the severity of leaks and potential damage to the interior finishes. In addition, on July 29, 2021, the Victor Valley Transit Authority entered into a lease agreement with the City converting the Transportation Center into a main hub for many bus routes. The City 2 9
4 2
remains responsible for roofing repairs under the lease agreement. Forecasted lease revenue over the next five years will be sufficient to pay off the interfund loan from the General Fund.
Discussion:
On November 18, 2022, a Notice Inviting Bids on a tile roofing system for the Transportation Center, Project CC23-063 was sent to fourteen contractors, posted on Ebidboard.com and the City’s website. A mandatory pre-bid meeting and job walk were held on December 7, 2022, and bids were due by December 20, 2022, at 2:30 p.m. The following five bids were received:
Contractor Location Bid
Rite-Way Roofing Corporation Fontana, CA $155,206.00
4 Seasons Roofing, Inc. Montebello, CA $157,250.00
McDonnell Roofing, Inc. Riverside, CA $157,266.00
Letner Roofing Company Orange, CA $158,600.00
Chapman Coast Roofing Company Fullerton, CA $169,636.00 After review and tabulation of the bid proposals, it was determined that Rite-Way Roofing Corporation is the lowest responsive and responsible bidder (Attachment B).
Staff recommends that the City Council award a contract to Rite-Way Roofing Corporation for the Transportation Center Re-Roof, Project, CC-23-063 in the amount of $155,206.00 (Attachment C). Staff is available for questions.
Attachments: A. Photos
B. Rite-Way Roofing Bid Form
C. Construction Agreement
Attachment A
Attachment B
Attachment C
1 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
CONSTRUCTION AGREEMENT
BY AND BETWEEN
THE CITY OF VICTORVILLE
AND
RITE-WAY ROOF CORPORATION
FOR
TRANSPORATION CENTER RE-ROOF, PROJECT CC23-063
THIS CONSTRUCTION AGREEMENT (the “Agreement”) is made and entered into by and between the City of Victorville, a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as the “City”, and Rite -Way Roof Corporation, a California corporation hereinafter referred to as the “Contractor”. The City and the Contractor are sometimes hereinafter referred to as a “Party” and collectively referred to as the “Parties.”
RECITALS:
WHEREAS, the City requires Transportation Center Re-roofing, Project CC23-063 (the Project); and
WHEREAS, in light of the facts set forth above, the City desires to retain Contractor in connection with Transportation Center Re-roofing; and
NOW, THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND
PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE CONSIDERATION, THE PARTIES HERETO AGREE AS FOLLOWS:
Section 1. RECITALS
The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth herein.
Section 2. TERM OF AGREEMENT
This Agreement shall commence the date of issuance of Notice to Proceed (the “Commencement Date”) and shall terminate upon completion of the Project Ninety (90) Calendar Days after Commencement Date (the “ Termination Date”), unless sooner terminated in accordance with the provisions of this Agreement (the “Term”). From and after the Termination Date, and upon subsequent agreement by the Parties, this Agreement may continue on a month- to-month basis until terminated pursuant to Section 3 below.
Section 3. TERMINATION OR SUSPENSION
a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.
2 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.
Section 4. CONTRACT DOCUMENTS; PRIORITY
a. Contract Documents. The Contract Documents consist of the following documents, all of which are either attached hereto as exhibits or are incorporated herein by this reference. Said Contact Documents are intended to be correlative and constitute Contractor’s performance obligations:
1. This Agreement.
2. Exhibits A & B.
3. Notice Inviting Bids for the Project.
4. Specifications for the Project.
5. Special Provisions.
6. Non-Collusion Declaration.
7. Guaranty.
b. Interpretation. In the event of any conflict between any of the Contract Documents, the document highest in the order of precedence (from highest to lowest), as set forth in Subsection
4.a above shall control.
Section 5. CONTRACTOR’S OBLIGATIONS
Contractor shall complete the Project as specifically set forth in the Contract Documents.
Contractor shall furnish, at its own cost and expense, all labor, services, material, tools, equipment, supplies, transportation, and any other items and facilities necessary therefore, as provided in the Contract Documents.
Section 6. COMPENSATION
The Contractor agrees to receive and accept the following amount, not to exceed One Hundred Fifty -five Thousand Two Hundred Six and 00/100 Dollars ($155,206.00) , as full compensation for furnishing; all materials, doing all the work contemplated and embraced in this contract, all loss or damage arising out of the nature of the work aforesaid, the action of the elements, any unforeseen difficulties or obstructions which may arise or be encountered in the execution of the work until its acceptance by the City, and for all risks of every description connected with the work, all expenses incurred by or in consequence of the suspension or discontinuance of work well and faithfully completing the whole work, thereof, according to the requirements of the agreement documents and to the satisfaction of Eddie Gleason, Facilities Manager, or his designee, to wit:
See Exhibit “A”, Scope of Work.
Section 7. BID PROPOSAL FORMS
The City shall pay Contractor as provided in the Bid Proposal Forms, attached hereto as Exhibit “B”, and incorporated herein by this reference as though set forth in full, subject to approval of the City, when applicable.
3 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
Section 8. PREVAILING WAGES
a. State Wages - In accordance with the provisions of California Labor Code Sections (1720,1770-1776, 1810, 1813 and 1815, as amended and applicable) , the State Director of Industrial Relations has determined the general prevailing rates of per diem wages in the locality where the Project is to be done. Copies of the updated Wage Determination rates are available from the CITY and the State of California via the internet at www.dir.ca.gov. Additionally, copies of the
prevailing rate of per diem wages and federal wage decision rates are on file at the City of Victorville Finance Department and shall be made available for review to any interested party on request.
Notwithstanding anything in the Contract Documents to the contrary, Contractor and all subcontractors shall pay not less than said specified State of California rates to all workers employed by them in the execution of the work contemplated by this Contract. Contractor shall be responsible for using the correct and current prevailing wage rates.
b. AB219 (as applicable) adds Section 1720.9 to the Labor Code, the hauling and delivery of ready-mixed concrete to carry out a public works contract, with respect to contracts involving state agency or any political subdivision of the state. Section 1720.9 defines the term “ready-mixed” concrete and specifies that the rate of pay shall be the current prevailing wage “for the geographical area in which the factory or batching plant is located” as determined by the DIR.
The statute also requires a written agreement between the party hauling or delivering the ready- mixed concrete and the party that engaged its services. Nothing in Section 1720.9 shall cause any company to be treated as a contractor or subcontractor for any purpose other than the application of this chapter of the Labor Code.
c. The delivery company shall provide certified payroll records under Labor Code section 1776(a) to the party that engaged its services and to the general contractor within five working days after the employee has been paid, accompanied by a written time record within five working days after the employee has been paid, accompanied by a written time record. The time record must be certified by each driver for the performance of job duties.
d. Contractor shall be solely responsible for using the correct wage decision or determination and performing accordingly. An error on the part of any awarding body does not relieve the Contractor from the responsibility for payment of the correct State prevailing wage and compliance with the maintenance and inspection of payroll records, posting of prevailing wage rates at work site, employment of apprentices, and other requirements of California Labor Code Section 1720, et seq.; California Code of Regulations, Title 8, Section 16000 et seq.; and all other applicable State labor laws. Contractor further acknowledges and agrees that it will be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with those laws. Contractor will require the same of all its subcontractors.
NOTE: Confirmation of certified payroll submittal to the Department of Industrial Relations (DIR) is required with each invoice to the City. Payment of the invoice may be delayed when proof of certified payroll submittal is not included with the Contractor’s invoice.
Section 9. WORKERS’ COMPENSATION INSURANCE
Contractor shall procure and maintain, at its own expense, during the Term of this Agreement, workers’ compensation insurance, providing coverage as required by the California State Workers’ Compensation Law. If any class of employees employed by Contractor is not protected by the California State Workers’ Compensation Law, Contractor shall provide adequate insurance for the protection of such employees to the satisfaction of the City. 4 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
In conformance with current statutory requirements of Section 1860 et seq., of the Labor Code of the State of California, the undersigned confirms the following as their certification:
I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract.
Section 10. NOTICE TO PROCEED
No work, service, material, or equipment shall be performed or furnished under this Contract unless and until a Notice to Proceed has been given to the Contractor by the City. Contractor shall commence work pursuant to the Contract Documents as directed by the City in the Notice to Proceed, and to diligently execute the same to completion within the time limits set forth in the Contract Documents.
Section 11. COMPLIANCE WITH LAWS
Contractor shall comply with all local, state, and federal laws and regulations applicable to the performance of the work required by the Contract Documents, including any rule, regulation, or bylaw governing the conduct or performance of Contractor, its employees, officers, board members, agents, independent contractors, and subcontractors. Unless otherwise specified in the Contract Documents, all required permits and licenses shall be held or obtained by the Contractor at its sole expense.
Section 12. COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY
INSURANCE
Contractor shall procure and maintain at its own expense, during the term of this Agreement, commercial general liability insurance, of not less than Two Million Dollars ($2,000,000) per occurrence, and Four Million Dollars ($4,000,000) in the aggregate, f or bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by the Contractor or its officers, employees, servants, volunteers, and agents and independent contractors.
Contractor shall further procure and maintain, at its own expense, during the Term of this Agreement, commercial vehicle liability insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) Combined Single Limit, covering any vehicle(s) utilized by Contractor or its officers, employees, servants, volunteers, or agents and independent contractors in performing the services required by this Agreement.
Section 13. COURSE OF CONSTRUCTION/INLAND MARINE INSURANCE
Contractor, and or any of its subcontractors, suppliers, vendors, employees, or person whom it performing any work under this agreement shall purchase, and maintain insurance to the full contract and insurable value thereof commonly referred to as a Course of Construction, Builders’ Risk, or an Inland Marine policy that offers “Installation” coverage for all materials, supplies, equipment, and property obtained by, or for Contractor, which is to become part of the work while such equipment and property is stored at the jobsite, at temporary locations, or while in transit to the project from such temporary locations. Contractor, and or any of its subcontractors, suppliers, vendors, employees, or person whom is performing any work under this agreement shall also 5 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
be responsible for insuring their owned, leased/rented or borrowed equipment. Insurance should also include a Loss Payee, and a Waiver of Subrogation Endorsement(s) in favor of the City of Victorville.
Section 14. ADDITIONAL INSURED
Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation coverage, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers, and agents and independent contractors, including, without limitation, the City Attorney, are named as Additional Insureds.
Section 15. WAIVER OF SUBROGATION RIGHTS
Contractor shall require the carriers of all required insurance policies to waive all rights of subrogation against the City and its officers, volunteers, employees, contractors, and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.
Section 16. PROOF OF INSURANCE COVERAGE; REQUIRED PRIOR TO
COMMENCEMENT OF SERVICES
a. Contractor shall secure from a good and responsible company or companies authorized to do insurance business in the State of California the policies of insurance required by this Agreement and furnish to the City Clerk certificates of said insurance at least one (1) day prior to the commencement of any services to be performed under this Agreement.
b. The certificates of insurance shall bear an endorsement whereby it is provided that, in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of non -payment, ten (10) days’ advance written notice shall be given.
c. The certificates of insurance shall bear an endorsement whereby it is provided that the respective insurance policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.
d. The certificates of insurance shall indicate that the respective insurance policy will be maintained throughout the Term of this Agreement.
e. The Commercial General Liability and vehicle liability policies shall be endorsed to contain the following provision: “For any claims related to this Contract, Contractor’s service coverage shall be primary with respect to the City. Any insurance maintained by the City shall be in excess of Contractor’s insurance and shall not contribute to it.
Section 17. TIME OF THE ESSENCE
Time is of the essence in the performance of this Agreement.
6 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
Section 18. INDEMNIFICATION
Notwithstanding the limits of any insurance, Contractor shall indemnify the City, its officials, officers, agents, volunteers and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or in connection with the negligent performance of the work, operations or ac tivities of Contractor, its agents, employees, subcontractors, or invitees, provided for herein, or arising or alleged to arise from the negligent acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, but excluding such claims or liabilities or portion of such claims or liabilities arising or alleged to arise from the negligence or willful misconduct of the City its officials, officers, agents, volunteers or employees, and in connection therewith:
a. Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;
b. Contractor will promptly pay any judgment rendered against the City, its officials, officers, agents or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor's (or its agents', employees', subcontractors' or invitees') negligent performance of or failure to perform such work, operations or activities hereunder; and Contractor agrees to save and hold the City, its officials, volunteers, officers, agents, and employees harmless there from;
c. In the event the City, its officials, officers, agents, volunteers or employees is made a Party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising or alleged to arise out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor shall pay to the City, its officials, volunteers officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees for counsel acceptable to City; d. Contractor's duty to defend and indemnify as set out in this Section shall include any claims, liabilities, obligations, losses, demands, actions, penalties, suits, costs, expenses or damages or injury to persons or property arising or alleged to arise from, in connection with, as a consequence of or pursuant to any state or federal law or regulation regarding hazardous substances, including but not limited to the Federal Insecticide, Fungicide and Rodenticide Act ("FIFRA"), Comprehensive Environmental Response, Compensation and Liability Act of 1980 ("CERCLA"), Resource Conservation and Recovery Act of 1976 ("RCRA"), the Hazardous and Solid Waste Amendments of 1984, the Hazardous Material Transportation Act, the Toxic Substances control Act, the Clean Air Act, the Clean Water Act, the California Hazardous Substance Account Act, the California Hazardous Waste Control Law or the Porter -Cologne Water Quality Control Act, as any of those statutes may be amended from time to time;
The Contractor's indemnification obligations pursuant to this Section shall survive the termination of this Agreement. Contractor shall require the same indemnification from all subcontractors.
7 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
Section 19. REPORTS
Upon request by Eddie Gleason, Facilities Manager , or his designee, Contractor shall prepare and submit reports concerning Contractor's performance of the work required by this Agreement.
Section 20. RECORDS
a. Contractor shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Eddie Gleason, Facilities Manager or his designee, to evaluate the cost and the performance of such services.
b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting p rinciples. Eddie Gleason, Facilities Manager , or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.
d. Records and supporting documents pertaining to the use of funds paid to Contractor hereunder shall be retained by Contractor and made available to Eddie Gleason, Facilities Manager, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement.
Section 21. MODIFICATIONS AND AMENDMENTS
This Agreement may be modified or amended only by a written instrument signed by both Parties.
Section 22. ENTIRE AGREEMENT
a. This Agreement supersedes any and all prior or contemporaneous agreements, either oral or written, between the City and Contractor with respect to the subject matter of this Agreement.
b. The Contract Documents contain all of the covenants and agreements between the Parties with respect to the subject matter herein, and each Party acknowledges that no representations, inducements, promises, or agreements have been made by or on behalf of any Party, except those covenants and agreements in this Agreement and the Contract Documents.
c. No agreement, statement, or promise with respect to the subject matter of the Contract Documents, which is not contained in the Contract Documents, or in a valid modification or amendment to the Contract Documents, shall be valid or binding on either Party.
Section 23. AMBIGUITIES
This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them.
Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement.
8 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
Notwithstanding the foregoing, the Parties agree that Exhibits “A” and “B” are attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this Construction Agreement and Exhibits “A” and “B”, the terms of this Construction Agreement shall control and nothing set forth in Exhibits “A” and “B” shall be deemed to supersede any of the provisions of this Construction Agreement.
Section 24. NOTICES
a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows:
To the City: Eddie Gleason, Facilities Manager
City of Victorville
14343 Civic Drive
Victorville, CA 92392
To Contractor: Jeff Hughes, President
Rite-Way Roof Corporation
15425 Arrow Route
Fontana, CA 92335
b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail.
Section 25. NON-LIABILITY OF CITY OFFICERS AND EMPLOYEES
No officer or employee of the City shall be personally liable to Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount, which may become due to Contractor or to its successor(s), or for any breach of any obligation of the terms of this Agreement.
Section 26. REVIEW BY ATTORNEYS
Each Party hereto has had its attorneys review this Agreement and all related documents.
Each Party hereto has consulted with its attorneys and has negotiated the terms of this Agreement based on such consultation.
Section 27. CARE OF WORK
Contractor must adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and other components to prevent losses or damages, and will be responsible for all damages, to persons or property, until acceptance of the work by the City, except those losses or damages as may be caused by the City’s own negligence. The performance of the work by Contractor or the payment of money by the City shall not relieve Contractor from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such inaccuracies are due to the negligence of Contractor.
9 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
Section 28. CAPTIONS AND HEADINGS
The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.
Section 29. SUCCESSORS, HEIRS, AND ASSIGNS
Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties.
Section 30. GENDER; PLURAL
In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another.
Section 31. SEVERABILITY
If any one or more of the sentences, clauses, paragraphs, or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair, or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein.
Section 32. GOVERNING LAW
The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law.
Section 33. CUMULATIVE REMEDIES
Except with respect to rights and remedies expressly declared to be exc lusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party.
Section 34. VENUE
All proceedings involving disputes over the terms, provisions, covenants, or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California.
Section 35. ATTORNEY'S FEES
Should any litigation, specifically including but not limited to, arbitration and other non-judicial resolution of disputes be commenced between the Parties to this agreement concerning this agreement or the rights and duties of either in relation thereto, the Parties prevailing in such litigation 10 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
or other proceeding shall be entitled, in addition to such other relief as may be granted, to a reasonable sum as and for attorney fees in such litigation where the proceeding which, if not agreed upon by the Parties, shall be determined by the court or other entity in which such litigation or other proceeding is brought.
Section 36. EFFECTIVENESS OF AGREEMENT
This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Contractor, approved by the City’s Risk Manager, and executed by the authorized City personnel or Mayor.
Section 37. REPRESENTATIONS OF PARTIES AND PERSONS
EXECUTING AGREEMENT
a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto.
b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent.
Section 38. COUNTERPARTS
This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement.
(END OF THIS PAGE)
11 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below.
THE CITY OF VICTORVILLE RITE-WAY ROOF CORPORATION
By:_______________________________ By:_________________________________ Debra Jones, Jeff Hughes,
Mayor President
Dated:______________________________ Dated:______________________________
ATTEST
By:________________________________
Jennifer Thompson,
City Clerk
Dated:_____________________________
THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM
By:________________________________ By:________________________________ Lee Brown, Andre de Bortnowsky,
Risk Manager City Attorney
Dated:______________________________ Dated:_____________________________
12 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
EXHIBIT A
SCOPE OF WORK
C ity agrees to engage Contractor and Contractor agrees to furnish all necessary labor, tools, materials, and equipment for and do the Work for the Project. The W ork shall be performed in accordance with: (i) the Scope of Work and applicable Addenda (as generally described in the Request for Bid, Project Number CC23-063, for the Project, portions of which are attached hereto for ease of reference as Exhibit "A", and the entirety of which is currently on file in office of the City Clerk); (ii) the prices set forth in Contractor’s Bid Proposal (attached as Exhibit "B").
CC23-063 TRANSPORTATION CENTER RE-ROOF PROJECT
14 C
ITY OF VICTORVILLE
CC23-063 TRANSPORTATION CENTER RE-ROOF PROJECT
SECTION C
SCOPE OF WORK
The
City of Victorville is requesting bids for Re-roofing of the Transportation Center located at 16858 D Street, Victorville, CA 92395. The scope of work shall include but is not limited to the removal of approximately 6,700 square feet of existing tile roofing system and the replacement of a new tile system. Contractor is required to verify measurements. The Contractor shall comply with all OSHA requirements and safety guidelines associated with the work within this contract. The Contractor is also responsible to procure and post any required permits prior to the commencement of work. Five years of commercial roofing for government entities including but not limited to State, municipalities, and/or school districts is required.
The
following are the minimum requirements for this project. All bids shall include a fully delivered reroofing system installation, meeting the following minimum specifications and requirements. Any deviation or exception must be clearly noted, explained, and included with your submitted bid. This document describes repairing unforeseen deck damage. The contractor shall submit a price per square foot to repair such damage on the Bid Form. If repairs are necessary and approved by the City, a change order shall be submitted reflecting the price per square foot on the Bid Form.
The existing roof tile is now discontinued, therefore the City has specified Boral Barcelona Tile as the replacement. Monte Sereno Blend is the specified color. (See attached cut sheet) P
reparation
• R
emove tiles and discard damaged tiles. Palletize undamaged tiles in preparation for the City to take possession and store.
• Tear off all underlayment and flashings down to wood decking. • Clear wood decking free of all dirt and debris. Ensure the deck is clean and dry prior to installation of the underlayment.
• The Contractor and the City shall inspect the roof decking and determine if areas of repairs exist.
• If applicable and approved by the City, remove damage decking and replace with new.
Re-r
oofing
• I
nstall new flashing, including but not limited to valley metal, eave riser, rakes, and trim ridges per manufacturer’s specifications.
• Install a self-adhered SBS membrane per manufacturer’s specifications. The underlayment shall be a minimum 40 lb. to replace existing.
• Fasten underlayment with metal cap nails.
• Install cedar wood battens, nailed down to the wood deck per manufacturer's specifications. • Install new Boral Barcelona roofing tiles per manufacturer’s specifications.
EXHIBIT A
13/Construction Agreement/Rite-Way Roof Corporation/Project CC23-063 14 Construction Agreement/Rite-Way Roof Corporation/Project CC23-063
EXHIBIT B
B
ID PROPOSAL FORMS
S
ee Attachment
EXHIBIT B
15/Construction Agreement/Rite-Way Roof Corporation/Project CC23-063 Item Number: 18
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Joe Slegers, Building Official
Subject:
Consultant/Professional Services Provider Agreement with TR Design Group for the Green Tree Clubhouse Library Relocation, Phase A Revision and Phase B, Project CC22- 037-A
Recommendation:
That the Honorable City Council approve a Consultant/Professional Services Provider Agreement in the amount of $896,014.98 with TR Design Group, Inc. for the Green Tree Clubhouse Library Relocation, Phase A Revision and Phase B, Project CC22-037-A Fiscal Impact:
Acting in accordance with the staff recommendation will result in a fiscal impact of $896,014.98.
The Building Forward Library Infrastructure Program Grant, provided by the California State Library will only fund design fees related to the base building addition of the clubhouse specifically designated for library space. Therefore, the services provided by TR Design Group will be funded by both the Building Forward Grant Account 2706030- 52300-21379 and Measure P (Fund 105) Account 1056030-52300-80075. Below is a summary of the design fees that will be funded by the Building Forward Grant and Measure P.
Account Available Funds TR Design Proposal
2706030-52300-21379 $550,000.00 $512,375.00
1056030-52300-80075 $400,000.00 $383,639.98
Total $896,014.98
Strategic Plan Goal:
The City of Victorville Strategic Plan 2020-2023 identifies multi-year strategic goals and various strategies to work toward achieving those goals. Goal E, Invest in Infrastructure, focuses on creating a healthy and livable community by maintaining the city’s assets 2 9
4 4
through investment in infrastructure and innovations. Specific to this project, Strategy 3 focuses on completing the Library Master Plan and developing implementation strategies to improve and enhance Library services in the community. Council adopted the Library Master Plan on April 20, 2021, and staff have been working to implement recommendations therein.
Background:
Through the Master Plan process, it was determined that the current library facility has inadequate space to serve the City’s current population. The current library facility has a footprint of 8,229 sq. ft. The City needs approximately 14,990 sq. ft. to serve the current population.
In May 2021, space became available at the Green Tree Golf Course Clubhouse (Clubhouse), prompting staff to investigate the potential for Library’s relocation. The Clubhouse location was consistent with certain Master Plan recommendations in that it is centrally located, has natural lighting desired for library facilities, and has an improved outdoor area for programming and use by library patrons. Due to its more recent construction date, the site also provides a higher level of code compliance including enhanced levels of ADA accessibility for visiting patrons. Because of these findings, staff elected to proceed and seek the services of an architectural design firm to redesign the Clubhouse into the City Library.
On March 15, 2022, Council unanimously awarded TR Design Group, Inc. a contract to conceptualize (Phase A) the Clubhouse as a space that will accommodate both library services and golf operations. Since then, TR Design has made numerous site visits to the existing library and new Green Tree location. They have taken 3D photographs, observed existing programs, and interviewed staff.
Utilizing the data from their research, TR Design created a first rendering of a conceptual design of the Library at Green Tree. The first rendering was circulated to key staff and stakeholders to review and provide input. Staff met to discuss their thoughts and findings, and those were forwarded to TR Design. This process continued for two more cycles before TR Design ultimately completed a final conceptual design of the Library at Green Tree utilizing the existing building footprint (Attachment A).
The next step in the design process would have been for TR Design to proceed with Phase B upon Council approval. Phase B included $383,639.98 to generate Architectural, Civil, Structural, Landscape, Mechanical, Plumbing, and Electrical construction drawings.
It also includes preparing bid-ready plans and documents to assist with advertising the bid for construction, obtaining permits, construction administration, post-construction services, and project management. Staff was prepared to request approval from the Council to continue the design into Phase B when we were informed of the Building Forward Grant award.
2 9
4 4
Discussion:
On November 4, 2022, staff was notified that the California State Library selected the Victorville City Library to receive $9,035,105.00 in Building Forward Grant funds. Council adopted Resolution No. 23-001, approving a budget amendment for Fiscal Year 2022/2023 to appropriate $9,035,105.00 in both revenue and expenditures related to the Building Forward Library Infrastructure Program Grant as awarded by the California State Library at the January 17, 2023, Council Meeting.
Grant funds will be used for Clubhouse renovations and the base building expansion related to library services, which include up to 5,000 sq. ft. of additional library space. This will allow the City to provide between 14,000 to 16,000 sq. ft. of library space to accommodate library services based on the City’s current population level as identified in the Master Plan.
Staff has obtained a proposal from TR Design Group for the design services to include up to a 5,000 square foot expansion (Attachment B). As mentioned above, Phase B of the original scope of services has not been completed and the cost associated with Phase B (Attachment C) will be included in the consultant/professional services provider agreement. The following is a summary of the cost of services.
Description Cost
Phase B of the original scope of services for existing footprint - Contract Documents
- Bidding Assistance
- Construction Administration
- Post Construction Services
- Permitting
- Project Management $383,639.98
Phase A of the new scope of service for expansion
- Conceptual Design
Phase B of the new scope of service for expansion
- Contract Documents
- Bidding Assistance
- Construction Administration
- Post Construction Services
- Permitting
- Project Management
- Furniture Specification $512,375.00
TOTAL COST $896,014.98
Staff requests the approval of the attached Consultant/Professional Services Provider Agreement in the amount of $896,014.98 with TR Design Group, Inc. for the Green Tree Clubhouse Library Relocation, Phase A Revision and Phase B, Project CC22-037-A (Attachment D). Staff is available for questions.
2 9
4 4
Attachments: A. Conceptual Design Without Expansion
B. TR Design Proposal Including Expansion
C. TR Design Original Bid Form Excluding Expansion
D. Service Agreement
Attachment A
77 SF
STAFF
RESTROOM
133 SF
LIBRARIAN
321 SF
STAFF
WORKSTATIONS
(4)
WORK ISLAND/STORAGE
BELOW
346 SF
WORK ROOM 243 SF
STAFF
LOUNGE
177 SF
STORAGE
LARGE ROW OF SHELVING
LARGE STORAGE
SYSTEM W LOCKS
264 SF
(E) MENS
RESTROOM
149 SF
Staff
Circulation
122 SF
IT ROOM
3,718 SF
MAIN
LIBRARY
412 SF
MAKER
SPACE
227 SF
MAKER`
SPACE
STUDIO
71 SF
FAMILY
RESTROOM
1,001 SF
GOLF
LOUNGE
187 SF
GOLF OFFICE
77 SF
VEST.
175 SF
CHILDREN'S
LIBRARIAN
749 SF
MULTI
PURPOSE
ROOM
VENDING
79 SF
ALL GENDER
TOILET
FACILITY
79 SF
ALL GENDER
TOILET
FACILITY
233 SF
MEETING
ROOM
131 SF
MEETING
ROOM
147 SF
PASSPORT
ROOM
82 SF
FRIENDS OF
THE LIBRARY
1,736 SF
CHILDRENS
LIBRARY
REFERENCE DESK
978 SF
GOLF SHOP
279 SF
FOOD/ BAR
UP
53 SF
STAFF
RESTROOM
EXISTING
MECHANICAL CHASE
TO ROOF
19 SF
JANITOR
CLOSET W/
MOP SINK
NEW AWNING
CD/ DVD YOUNG ADULT
4) NEW WINDOWS
TO MATCH EXISTING
DESK TOP
COMPUTER
STATIONS
RETRACTABLE
WALL
HALF DOOR
RETRACTABLE
WALL CLEAR
EXISTING WINDOW
SELF -CHECKOUT
SELF -CHECKOUT
PRINTER/COPIER
CHANGE MACHINE
NEW WINDOW
SIMILAR TO EXISTING
FIRE PLACE TO
REMAIN
693 SF
YOUNG
ADULT/
CD/DVD
SCALE 1/8" = 1'-0"
MAIN FLOOR PLAN
SET REVIEWED BY DATE
DATE
APPROVED BY
APPROVAL STAMP
c 2022 TR DESIGN GROUP, INC.
ALL RIGHTS RESERVED
MADE IN THE USA
PROJECT:
JOB #:
14343 Civic Drive,
Victorville Green Tree
Libary
14144 Green Tree Blvd.
Victorville, CA 92395
CLIENT UPDATE -
MAIN FLOOR PLAN
3 Victorville, CA 92392
City of Victorville
21-067
NO
RTH
UPDATE 22-1114
UPDATE 22-1114
UPDATE 22-1114
125 SF
STORAGE
882 SF
STORAGE/
WORK ROOM
122 SF
STORAGE
158 SF
(E)
MECHANICAL
ROOM 5,288 SF
GOLF CART
STORAGE
343 SF
GENERAL
STORAGE
195 SF
CART WASH
276 SF
BAG
STORAGE
SET REVIEWED BY DATE
DATE APPROVED BY
APPROVAL STAMP
c 2022 TR DESIGN GROUP, INC.
ALL RIGHTS RESERVED
MADE IN THE USA
PROJECT:
JOB #:
14343 Civic Drive,
Victorville Green Tree
Libary
14144 Green Tree Blvd.
Victorville, CA 92395
CLIENT UPDATE -
LOWER FLOOR
PLAN
4 Victorville, CA 92392
City of Victorville
21-067
NO
RTH SCALE 1/8" = 1'-0"
LOWER LEVEL FLOOR PLAN
UPDATE 22-1114
UPDATE 22-1114
UPDATE 22-1114
Attachment B
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial
ARCHITECT: CLIENT:
PROJECT: RENOVATION AND EXPANSION OF THE EXISTING 1 3,780 S.F. BUILDING KNOWN AS THE GREEN TREE CLUBHOUSE LOCATED AT 14144 GREEN TREE BLVD., VICTORVILLE, CA
SCOPE: ADDITIONAL SERVICES TO ACCOMMODATE THE PROPO SED EXPANSION TO THE BUILDING BY 5,000 S.F. AT THE PREVIOUSLY PROPOSED RATE OF $ 89 / S.F. 4,300 S.F. PLANNED EXPANSION WITH 700 S.F. CONTI NGENCY SPACE
FINAL CONTRACT AMOUNT TO BE CALCULATED ON THE ORI GINAL CONTRACT AMOUNT PLUS THE GROSS S.F. OF EXPANSION X $ 89 / S.F. + FURNITURE SELECTION CONSULTING
DISCIPLINES INCLUDE:
ARCHITECTURAL
CIVIL ENGINEERING (FOR GRADING AND UTILITIES AROUND THE EXPANSION. WQMP FOR THE
IMPROVED AREAS ONLY)
STRUCTURAL ENGINEERING (LIMITED TO ANALYSIS FOR TI AND ENGINEERING FOR THE EXPANSION) MECHANICAL, PLUMBING AND ELECTRICAL ENGINEERING
LANDSCAPE / IRRIGATION DRAWINGS FOR THE AREA AROUND THE EXPANSION ONLY PROJECT MANAGEMENT
ENTITLEMENTS PROCESSING IS NOT INCLUDED AND SHALL BE HANDLED BY THE CITY INDEPENDENTLY
ADDITIONAL SERVICES FOR THE FURNITURE VENDOR DESIG N, SPECIFICATION AND COORDINATION
OF THE PROPOSED FURNITURE (NOTE THAT THIS DOES NOT INCLUDE PROCUREMENT) WHICH WERE NOT INCLUDED IN THE ORIGINAL PROPOSAL NOR THE PROPOSED “EXPANSION RATE” OF $ 89 / S.F.
TR Design Group, Inc.
Thomas Riggle, Architect, License #: C24877
2900 Adams Street, Studio A-400
Riverside, CA 92504
951 – 742 – 7179
City of Victorville
Eddie Gleason, Facilities Manager
14343 Civic
Drive, Victorville, CA 92392
760 – 955 – 5256
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial
SCOPE / INTENT AND EXTENT OF ARCHITECT'S ADDITIONAL SERVICES:
Part A - Phase 01 Conceptual Design
Same Scope as the Original Contract, but for the larger project.
Part B -
Phase 02 & 03
Schematic Design
Not Included nor required for this project.
Part B - Phase 04 Contract Documents
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 05 Bidding Assistance
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 06 Construction Administration
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 07 Post Construction Services
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 08 Permitting
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 09 Project Management Services
Same Scope as the Original Contract, but for the larger project.
ADDITIONAL SERVICES TO THE EXPANSION REQUEST:
Part B - Phase 04 Furniture Selections
Furniture Selection services including:
Meet with and review furniture requirements with the City.
Determine City requirements / availability / needs.
Prepare and specify furniture for bidding.
Coordinate with Client.
Includes up to 15 hours during Construction to review and confirm furniture selections in the field in up to (3) site visits.
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial COMPENSATION FOR ADDITIONAL SERVICES OF THE ARCHITECT:
Shall be FIXED FEE in the amount as follows:
Architectural & Consultant Services Phase Total
Part A - Phase 01 Conceptual Design 68,537.76 $
Part B - Schematic Design
Part B - Phase 04 Contract Documents
Part B - Phase 05 Bidding Assistance
Part B - Phase 06 Construction Administration 376,462.24
Part B - Phase 07 Post Construction Services
Part B - Phase 08 Permitting
Part B - Phase 09 Project Management Services
TOTAL FOR AS / EXPANSION / ORIGINAL SCOPE 445,000.00 $
ADDITIONAL SERVICES TO THE EXPANSION REQUEST:
Part B - Phase 04 Furniture Selections 56,250.00 $
Architecture TR Design Group
Furniture Selections GMBI - Furniture selection, coo rdination and specification. Note: This does not include procurement.
Other: Not included.
TOTAL WITH FURNITURE SELECTIONS 445,000.00 $
Services on a Time and Materials basis will periodically be billed at the hourly rate schedule within.
$
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial BASIS OF COMPENSATION:
FOR BASIC SERVICES, as described above, Basic Compensation shall be computed as follows:
FIXED FEE IN THE AMOUNT OF:
FOR PHASES 01 – 09 WITH SCOPE IN THEM AS NOTED ABO VE:
Four Hundred Forty Five Thousand Dollars and No Ce nts, $445,000.00, plus reimbursable expenses.
FOR PHASE 04 – FURNITURE SELECTION SERVICES ONLY:
Fifty Six Thousand Two Hundred Fifty Dollars and N o Cents, $56,250.00, including the reimbursable expenses budg et.
FOR THE PHASES WITH SCOPE IN THEM NOTED ABOVE INCLUDING THE REIMBURSABLES BUDGET:
Five Hundred Twelve Thousand Three Hundred Seventy Five Dollars and No Cents, $512,375.00, including the reimbursable expenses budg et.
PAYMENT SCHEDULE:
$ 68,537.76 plus Reimbursables due during PART A - Conceptual Design $ 376,462.24 plus Reimbursables due during the project per the PART B - Original Scope billing $ 445,000.00 TOTAL plus Reimbursables
$ 56,250.00 plus Reimbursables due during PART B - Furniture Selections $ 501,250.00 TOTAL including Project Management Services plus Reimbursables
$ 11,125.00 Reimbursables Budget
$ 512,375.00 TOTAL with Reimbursables Budget
COMPENSATION FOR FURTHER ADDITIONAL SERVICES beyond those listed in the basic services will be b illed on an hourly basis as described in The Terms and Conditions.
COMPENSATION FOR SERVICES OF THE ARCHITECTS CONSULTANTS: All Consultants (if engaged as part of the Scope) including, but not limited to, civil, landscape, st ructural, mechanical, plumbing and electrical engin eering shall be a multiple of one and twenty-five one-hundredths (1.25) times the amounts billed to the Architect for such services.
REIMBURSABLE EXPENSES:
FOR REIMBURSABLE EXPENSES, a multiple of one and fi fteen one hundredths (1.15) times the expenses incu rred by the Architect, the Architect's employees and consultants in the interest of the project. Reimbursable will periodically be billed.
Reimbursables Budget As Required (usually less than 2.5% of contract amount) 11,125.00 $
Attachment C
TR DESIGN GROUP, INC.
951-742-7179
951-742-7178
[email protected]
THOMAS RIGGLE
PRESIDENT
10/22/21
THOMAS RIGGLE
FOR THE CONCEPTUAL DESIGN WHETHER OR NOT IT INCLUDES AN
EXPANSION TO THE BUILDING
AN EXPANSION TO THE BUILDING
FOR THE PROJECT BASED ON 1ST FLOOR MODIFICATIONS, NO
STRUCTURAL UPGRADES AND NO EXPANSION BEYOND SOMETHING
SIMILAR TO OUR CONCEPT PRESENTED.
FOR AND EXPANSION OF UP TO 1,000 S.F. AND NO STRUCTURAL UPGRADES TO THE EXISTING BUILDING.
An Additional
89,250
82,262.50
383,639.98
465,902.48
TOTAL PHASES A + B
(INCLUDES OPTIONAL PROJECT MANAGEMENT SERVICES)
1/7/22
REVISED
Attachment D
1 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENT
BY AND BETWEEN
THE CITY OF VICTORVILLE
AND
TR DESIGN GROUP, INC.
FOR
GREEN TREE CLUBHOUSE LIBRARY RELOCATION, PHASE A
REVISION AND PHASE B, PROJECT CC22-037-A
THIS CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENT (hereinafter “Agreement”), is made and entered into by and between THE CITY OF VICTORVILLE, a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as the “City” , and TR Design Group, Inc., a California corporation, hereinafter referred to as “ Consultant.” City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties.”
RECITALS:
WHEREAS, the City had a Consultant/Professional Services Agreement (hereinafter referred to as “Original Agreement”) with the Consultant to provide Design Engineering Services for the Green Tree Clubhouse Library Relocation, Phase A, as described under Request fo r Proposal (RFP), issued under Project CC22-037.
WHEREAS, Consultant provided a response to said Project RFP and fol lowing an evaluation process was selected by the City to provide said services consisting of a conceptual re-design of the existing Green Tree Golf Course clubhouse to accommodate a City -operated library. Phase B, full plan package was not included in the Original Agreement; and
WHEREAS, on or about November 4, 2022, the City received additional funding through a state grant which afforded the City to revise the design to incorporate up to 5,000 square feet of expansion and initiate Phase B, to initiate completion of the full plan package which includes the remainder of the architectural pages, mechanical, electrical, plumbing, structural (if necessary), and any other plans required to show compliance with local and state codes and obtain approval for permit issuance; and
WHEREAS, Consultant represents that it is qualified to perform the consulting and/or professional services required for performance under this Agreement by virtue of its experience and the training, education and expertise of its principals and its employees; and
WHEREAS, in light of the facts set forth above, the City desires to retain the services of a qualified Consultant to provide, on an independent contractor basis, Green Tree Clubhouse Library Relocation, Phase A Revision and Phase B; and
NOW THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND
PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE
CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES HERETO AGREE AS FOLLOWS:
2 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 1. RECITALS
The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth fully herein.
Section 2. SCOPE OF SERVICES
Consultant shall provide to the City those services set forth in the Scope of Services, attached hereto as Exhibit “A” and incorporated as part of this Agreement by this reference.
Section 3. COMPENSATION
The City shall pay to Consultant a sum not to exceed Eight Hundred Ninety- six Thousand Fourteen and 98/100 Dollars ($ 896,014.98) for satisfactory performance of the services to be rendered under this Agreement, subject to the Proposal provisions of Section 4, below. No expense reim bursements, including, but not limited to, reimbursements for travel, parking, lodging, and/or meals shall be paid to Consultant unless such expense reimbursements:
(i) are specifically provided for and described by nature and type in Exhibit “B”, below; (ii) appear on Consultant’s monthly invoices to City; (iii) are supported by the appropriate receipts and other such documentation as the City shall require; and (iv) are directly related to the Scope of Services to be performed under this Agreement. In addition, any and all reimbursements shall be made in accordance with any City policy governing same.
Section 4. COST PROPOSAL
The City shall pay Consultant as provided in the Cost Proposal, attached hereto as Exhibit “B” and incorporated as part of this Agreement by this reference. The provisions of Exhibit “ B” notwithstanding, in order to receive payments, Consultant shall be required to submit to the City detailed monthly invoices which include, if applicable, a description of all services/tasks performed, the number of hours expended on each service/task, the name of the person performing the service/task, and expense reimbursement information, if any, as required by Section 3, above. Provided that services have been satisfactorily rendered, invoices shall be paid by the City approximately thirty (30) working days following receipt of Consultant’s invoice.
Section 5. RESERVED
Section 6. TERM OF AGREEMENT
This Agreement shall be for an Initial Term commencing on the date of full execution of the Agreement (the “Commencement Date”) and expiring June 30, 2026 (the “Termination Date”) (the “Term”), unless terminated earlier pursuant to Section 21 of this Agreement. From and after the Termination Date, and upon subsequent Agreement by the Parties, this Agreement may continue on a month-to-month basis until terminated pursuant to Section 21 below.
Section 7. INDEPENDENT CONTRACTOR STATUS
It is the express intention of the Parties that Consultant is an independent contractor and not an employee, agent, joint venture, or partner of the City. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between the City and Consultant or any employee or agent of Consultant . Both P arties acknowledge that Consultant is not an employee for state or federal tax purposes or any other 3 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
purpose. Consultant shall retain the right to perform services for others during the term of this Agreement.
Section 8. REPRESENTATIONS AND ACKNOWLEDGMENTS
REGARDING INDEPENDENT CONTRACTOR’S STATUS OF
CONSULTANT
a. Consultant represents and acknowledges the following:
(1) The City is not required to provide any training or legal counsel to Consultant or its employees in order for Consultant to perform the services described in this Agreement.
(2) Performance of the services described in this Agreement does not have to be integrated into the daily business operations of the City.
(3) The services described in this Agreement can be performed without the use of City equipment, materials, tools, or facilities, unless otherwise provided under a separate Agreement.
(4) Nothing in this Agreement shall be interpreted to imply that the City must maintain any contractual relationship with Consultant on a continuing basis after termination of this Agreement.
(5) The City will not be requested or demanded to assume any liability for the direct payment of any salary, wage, or other such compensation to any person employed by Consultant to perform the services described in this Agreement.
(6) Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are employees of the City.
b. The City represents and acknowledges the following:
(1) Consultant is solely responsible for determining who, under the supervision or direction of Consultant, will perform the services set forth in this Agreement.
(2) The City will not hire, supervise, or pay any employees or assistants working for Consultant pursuant to this Agreement. Nothing contained in this Agreement shall prevent the City from hiring Consultant’s employees or assi stants one year after termination of this Agreement.
(3) Nothing in this Agreement shall be interpreted to imply that Consultant must maintain any contractual relationship with the City on a continuing basis after termination of this Agreement.
(4) It is the sole responsibility of Consultant to set the hours in which Consultant performs or plans to perform the services set forth in this Agreement.
(5) Consultant is not required to devote full time to the business operations of the City in order to perform the services set forth in this Agreement.
4 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
(6) Unless deemed necessary under certain circumstances, Consultant is not required to perform the services set forth in this Agreement at City Hall or on City-owned property.
(7) Other than attendance at required public meetings and public hearings, and complying with the provisions of the Proposal set forth in Exhibit B and any procedural requirements set forth by law, Consultant is not required to perform the services set forth in this Agreement in any particular order or sequence.
(8) Nothing in this Agreement shall be interpreted to preclude Consultant from working for other persons or firms, provided that such work does not create a conflict of interest.
Section 9. NOT AGENT OF THE CITY
a. Nothing contained in this Agreement shall be deemed, construed, or represented by the City or Consultant or by any third person to create the relationship of principal and agent.
b. Consultant shall have no authority, express or implied, to act on behalf of the City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind the City to any obligation whatsoever.
Section 10. LICENSES AND PERMITS
Consultant represents that it has obtained and will maintain at all times during the I nitial Term ( and during the Option Period, if applicable) of this Agreement all business licenses, including but not limited to a City of Victorville business license, professional licenses or certifications, or permits necessary for performing the services described in this Agreement.
Section 11. STANDARD OF PERFORMANCE
a. Consultant agrees to perform all services required by this Agreement in a professional and competent manner, in accordance with the degree of skill and diligence which is normally employed by similar professionals performing similar services under similar conditions in the same or similar locality. Such services shall also be performed in a manner which i s reasonably satisfactory to Eddie Gleason, Facilities Manager, or his designee.
b. By executing this Agreement, Consultant warrants that it:
(1) Has thoroughly investigated and considered the services and work to be performed;
(2) Has investigated the issues regarding the scope of services to be provided;
(3) Has carefully considered how the services and related work should be performed; and
(4) Fully understands the facilities, difficulties and restrictions associated with performance of the services required by this Agreement.
5 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 12. FAMILIARITY WITH WORK
Should Consultant discover any latent or unknown conditions materially differing from those inherent in the services or as represented by the City, Consultant shall immediately inform the City of such fact and shall not provide any services, except at Consultant 's risk, until written instructions are received from Eddie Gleason, Facilities Manager, or his designee.
Section 13. CONFLICTS OF INTEREST
Consultant covenants that it does not have any interest, nor shall it acquire any interest, directly or indirectly, which would conflict in any manner with the performance of Consultant’s services under this Agreement. Consultant further covenants that in the performance of services under this Agreement, no officer, employee or agent of Consultant having such interest shall be employed by it. In the event the City determines that Consultant must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests, Consultant shall file such Form 700 with the City Clerk’s Office pursuant to the written instructions provided by the City Clerk. Acquisition or maintenance of a conflicting interest by Consultant may result in termination of this Agreement by the City.
Section 14. COMPLIANCE WITH LAWS
Consultant shall comply with all local, state, and federal laws and regulations applicable to the services to be rendered hereunder, including any rule, regulation, or bylaw governing the conduct or performance of Consultant or its employees, officers, or board members.
Section 15. C OMMERCIAL GENERAL AND AUTOMOBILE LIABILITY
INSURANCE
a. Consultant shall procure and maintain at its own expense, during the I nitial Term of this Agreement (and during the Option Period, if applicable) , Commercial G eneral Liability Insurance, of not less than One Million Dollars ($1,000,000) per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by Consultant or its officers, employees, servants, volunteers, and agents and independent contractors.
b. Consultant shall further procure and maintain, at its own expense, during the Initial Term of this Agreement, (and during the Option Period, if applicable), Commercial Vehicle Liability Insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) combined single limit, covering any vehicle utilized by Consultant or its officers, employees, servants, volunteers, agents and independent contractors in performing the services required by this Agreement.
Section 16. WORKERS' COMPENSATION INSURANCE
a. Consultant shall procure and maintain at its own expense, during the I nitial Term of this Agreement ( and during the Option Period, if applicable), W orkers' Compensation Insurance, providing coverage as required by the California State Workers' Compensation Law.
b. If any class of employees employed by the Consultant pursuant to this Agreement is not protected by the California State Workers' Compensation Law, Consultant shall provide adequate insurance for the protection of such employees to the satisfaction of the City. 6 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 17. PROFESSIONAL LIABILITY INSURANCE
a. Professional Liability Insurance or Errors and Omissions insurance as appropriate to Consultant’s profession shall be required and written on a policy form specifically designed to provide coverage for and protect against the negligent acts, errors and omissions of the Consultant in the performance of the services required by this Agreement. A minimum limit of $1,000,000 per claim and in the aggregate must be provided.
Section 18. ADDITIONAL INSURED
Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, all insurance policies, except for the Workers' Compensation and Professional Liability, shall be endorsed to name the City and its officers, employees, servants, volunteers, agents and independent contractors, including, without limitation, the City Attorney, as Additional Insureds.
Section 19. WAIVER OF SUBROGATION RIGHTS
Consultant shall require the carriers of all required insurance policies, with exception to Professional Liability, to waive all rights of subrogation against the City and its officers, employees, servants, volunteers, agents, and independent contractors and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.
Section 20. PROOF OF INSURANCE COVERAGE; REQUIRED
ENDORSEMENTS
a. Consultant shall secure from a good and responsible company or companies authorized to transact insurance business in the State of California, the policies of insurance required by this Agreement and furnish to the City Clerk certificates of insurance evidencing the required coverage, and policy endorsements at least one (1) business day prior to the commencement of any services to be performed under this Agreement.
b. The policies and certificates of insurance shall be endorsed to provide that in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of cancellation for non-payment, ten (10) days advance written notice shall be given.
c. Each policy and certificate of insurance shall be endorsed to provide that the policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.
d. Each policy and certificate of insurance shall be endorsed to provide that the policy will be maintained throughout the Initial Term (and during the Option Period, if applicable), of this Agreement.
e. The Commercial General Liability and Vehicle Liability policies shall be endorsed to contain the following provision: “For any claims related to this Agreement, Consultant’s coverage shall be primary with respect to the City. Any insurance maintained by the City shall be in excess of Consultant’s insurance and shall not contribute with it.” 7 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 21. TERMINATION OR SUSPENSION
a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination.
b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination.
Section 22. TIME OF THE ESSENCE
Time is of the essence in the performance of this Agreement.
Section 23. INDEMNIFICATION
a. Except as set forth in Subsection b of this Section 23, and to the fullest extent permitted by law, Consultant shall immediately indemnify, and hold harmless the City, its officers, employees, representatives, and agents (the “City Indemnitees”), from and against those actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and reasonable attorneys’ fees, for any personal injuries, deaths, or property damage, including property owned by the City (collectively “Claims”) , Consultant's negligence or willful misconduct in the performance of the services described in this Agreement, unless such Claims are proven to be caused by the negligence or willful misconduct of the City Indemnitees.
b. The provisions of this Subsection b apply only in the event that Consultant is a design professional within the meaning of California Civil Code section 2782.8 (“Design Professional”). The term Design Professional, as defined in said section, is limited to licensed architects, licensed landscape architects, registered professional engineers, professional land surveyors, and the business entities that offer such services in accordance with the applicable provisions of the California Business and Professions Code.
(1) Notwithstanding the provisions of Subsection a above, to the extent that the services to be provided under this Agreement are those of a Design Professional, Consultant's duty to indemnify, hold harmless, the City Indemnitees shall be limited to the extent that any Claims to the extent caused by the negligence, recklessness, or willful misconduct of the Consultant, its officers, employees or subconsultants in the performance of the services described in this Agreement. Consultant does not have a duty to defend City.
(2) In no event shall the costs of defense charged to Consultant exceed the Consultant’s proportionate percentage of fault, except as otherwise set forth in said Civil Code section 2782.8, the provisions of which are incorporated into this Agreement by this reference.
Nothing in this Subsection b shall be construed to require Consultant to provide indemnification for Claims caused by the active negligence or willful misconduct of the City Indemnitees. 8 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
c. The City does not and shall not waive any rights that it may have against Consultant under this Section, because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions of this Section 23 shall apply regardless of whether said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost, or expense described herein.
d. The obligation to indemnify, as set forth in this Section 23, is binding on the successors, assigns, or heirs of Consultant and shall survive the expiration or any early termination of this Agreement.
Section 24. REPORTS
Upon request by Eddie Gleason, Facilities Manager, or his designee, or as otherwise required by this Agreement, including but not limited to, the Scope of Services set forth in Exhibit “A”, Consultant shall prepare and submit reports to the City concerning Consultant's performance of the services required by this Agreement.
Section 25. RECORDS
a. Consultant shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Eddie Gleason, Facilities Manager, or his designee, to evaluate the cost and the performance of such services.
b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles.
c. Eddie Gleason, Facilities Manager, or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.
d. Records and supporting documents pertaining to the use of funds paid t o Consultant hereunder shall be retained by Consultant and made available to Eddie Gleason, Facilities Manager, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement.
Section 26. RESERVED
Section 27. CONFIDENTIALITY; OWNERSHIP OF WORK
a. Any and all documents and information obtained from the City or prepared by Consultant for the City shall be kept strictly confidential unless otherwise provided by applicable law. All City data, documents and information shall be returned to the City upon termination of the Agreement.
b. Any drawings, specifications, reports, records, documents, or other materials prepared by Consultant in the performance of services under this Agreement shall not be released publicly without the prior written approval of Eddie Gleason, Facilities Manager , or his designee, or as required by applicable law.
9 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
c. Consultant shall not disclose to any other entity or person any information regarding the activities of the City, except with the prior written approval of Eddie Gleason, Facilities Manager, or his designee, or as required by applicable law.
d. All original documents, reports, designs, computer files and all other materials prepared by Consultant in the course of performing the services pursuant to this Agreement, whether completed or in progress, are the property of the City and shall be surrendered to the City upon the completion of Consultant’s services or when requested by Eddie Gleason, Facilities Manager, or his designee. Such materials may be used, reused or otherwise disposed of by the City without the permission of Consultant.
e. Consultant’s covenants under this Section 27 shall survive the termination of this Agreement.
Section 28. PRINCIPAL REPRESENTATIVES
a. Thomas Riggle, President , is designated as the principal representative of Consultant for purposes of communicating with the City on any matter associated with the performance of the services set forth in this Agreement.
b. Eddie Gleason, Facilities Manager, or his designee, shall be the principal representative of the City for purposes of communicating with Consultant on any matter associated with the performance of the services set forth in this Agreement.
c. Either Party may designate another individual as its principal representative by giving written notice of such designation to the other Party.
Section 29. MODIFICATIONS AND AMENDMENTS; EXTRA SERVICES
a. This Agreement may be modified or amended only by a written instrument signed by both Parties.
b. During the I nitial Term, the City may request that the Consultant perform Extra Services. As used herein, "Extra Services" means any services, which are determined by the City to be necessary for the proper completion of Green Tree Clubhouse Library Relocation, Phase A Revision and Phase B, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. A written instrument signed by both Parties shall be required to authorize performance of and payment for Extra Services.
Section 30. ENTIRE AGREEMENT
a. This Agreement supersedes any and all prior or contemporaneous Agreement s, either oral or written, between the City and Consultant with respect to the subject matter of this Agreement.
b. This Agreement contains all of the covenants and Agreements between the Parties with respect to the subject matter of this Agreement, and each Party to this Agreement acknowledges that no representations, inducements, promises, or Agreements have been made by or on behalf of any Party, except those covenants and Agreements in this Agreement.
10 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
c. No Agreement, statement, or promise with respect to the subject matter of this Agreement, which is not contained in this Agreement, or in a valid modification or amendment to this Agreement, shall be valid or binding on either Party.
Section 31. AMBIGUITIES
This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted agains t either of them.
Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement.
Notwithstanding the foregoing, the Parties agree that Exhibits “A” and “B” are attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this Consultant/Professional Services Standard Provider Agreement and Exhibit s “A” and “B ” the terms of this Consultant/Professional Services Standard Provider Agreement shall control and nothing set forth in Exhibit s “A” and “B” shall be deemed to supersede any of the provisions of this Consultant/Professional Services Standard Provider Agreement.
Section 32. NOTICES
a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows:
To the City: Eddie Gleason, Facilities Manager
Building Department
City of Victorville
14343 Civic Drive
Victorville, CA 92392
To Consultant: Thomas Riggle, President
TR Design Group, Inc.
2900 Adams St., Ste A400
Riverside, CA 92504
b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail.
Section 33. NON-LIABILITY OF CITY OFFICERS AND
EMPLOYEES
No officer or employee of the City shall be personally liable to Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount, which may become due to Consultant or to its successor(s), or for any breach of any obligation of the terms of this Agreement.
11 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 34. REVIEW BY ATTORNEYS
Each Party hereto has had its attorney(s) review this Agreement and all related documents. Each Party hereto has consulted with its attorney(s) and has negotiated the terms of this Agreement based on such consultation.
Section 35. WAIVER
a. No waiver shall be binding unless executed in writing by the Party making the waiver.
b. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision.
c. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of such provision or any of the remaining provisions of this Agreement.
Section 36. ASSIGNMENT
This Agreement shall not be assigned by either Party without prior written consent of the other Party.
Section 37. CARE OF WORK
The performance of services by Consultant or the payment of money by the City shall not relieve Consultant from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such incomplete, inaccurate or defective work is due to the negligence of Consultant.
Section 38. CAPTIONS AND HEADINGS
The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.
Section 39. SUCCESSORS, HEIRS, AND ASSIGNS
Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties.
Section 40. GENDER
In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another.
12 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 41. SEVERABILITY
If any one or more of the sentences, clauses, paragraphs, or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair, or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein.
Section 42. GOVERNING LAW
The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law.
Section 43. DEFAULT
a. Failure or delay by any Party to this Agreement to perform any material term or provision of this Agreement shall constitute a default under this Agreement; provided however, that if the Party who is otherwise claimed to be in default by the other Party commences to cure, correct, or remedy the alleged default within fifteen (15) days after receipt of written notice specifying such default and shall diligently complete such cure, correction, or remedy, such Party shall not be deemed to be in default hereunder.
b. The Party claiming that a default has occurred shall give written notice of default to the Party in default, specifying the alleged default. Delay in giving such notice shall not constitute a waiver of any default nor shall it change the time of default; provided, however, the injured Party shall have no right to exercise any remedy for a default hereunder without delivering the written default notice, as specified herein.
c. Any failure or delay by a Party in asserting any of its rights or remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
d. In the event that a default by any Party to this Agreement may remain uncured for more than fifteen (15) days following written notice, as provided above, the injured Party shall be entitled to seek any appropriate remedy or damages by initiating legal proceedings.
Section 44. CUMULATIVE REMEDIES
Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party.
Section 45. VENUE
All proceedings involving disputes over the terms, provisions, covenants, or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California.
13 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Section 46. ATTORNEYS’ FEES
In the event any action, suit, or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement, or as a result of any alleged breach of any provision of this Agreement, the prevailing Party in such suit or proceeding shall be entitled to recover its costs and expenses, including reasonable attorneys’ fees, from the losing Party, and any judgment or decree rendered in such a proceeding shall include an award thereof.
Section 47. EFFECTIVENESS OF AGREEMENT
This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Consultant , approved by the City ’s Risk Manager, and executed by the authorized City personnel or Mayor.
Section 48. REPRESENTATIONS OF PARTIES AND PERSONS EXECUTING
AGREEMENT
a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto.
b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent.
Section 49. COUNTERPARTS
This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement.
(END OF THIS PAGE)
14 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below.
THE CITY OF VICTORVILLE TR DESIGN GROUP, INC.
By:______________________________ By:_____________________________ Debra Jones, Thomas Riggle,
Mayor President
Dated: ___________________________ Dated:__________________________
ATTEST
By:______________________________
Jennifer Thompson,
City Clerk
Dated:___________________________
THE CITY OF VICTORVILLE APPROVED AS TO STANDARD
FORM:
By: _______________________________ By: ____________________________ Lee Brown, Andre de Bortnowsky,
Risk Manager City Attorney
Dated:______________________________ Dated:__________________________
15 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
EXHIBIT A
SCOPE OF SERVICES
City agrees to engage Consultant and Consultant agrees to furnish all necessary labor, tools, materials, equipment for and to do the Work for the Project. The Work shall be performed (i) as generally described in the Request for Proposal, Project CC22-037, and any applicable addenda, portions of which are attached hereto for ease of reference as Exhibit "A", and the entirety of which is currently on file in office of the City Clerk); and (ii) the prices set forth in Consultant’s, Phase A Proposal (attached as Exhibit "B).
16 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
SCOPE OF SERVICES
Phase A : Conceptual re- design of the existing Green Tree Golf Course clubhouse to accommodate a City-operated library, while still also accommodating the existing pro shop and an associated bar and snack area. This initial phase will include only a floor plan concept that demonstrates how it will incorporate all current functions of the Victorville Library as well as the existing golf operation. The design should keep the following goals in mind:
1. Adequate space should be provided for all uses and programs currently accommodated at the City’s library including, but not limited to, administrative space for staff, comparable space for the Friends of the Library, processing of passports, book stack areas, computer stations, areas to conduct children’s literacy programs, etc.
2. Where possible, the design should also consider the City’s Library Master Plan and incorporate any suggested features that can be incorporated within existing spaces and up to 5,000 sq ft of expansion. Examples of this would be intelligent lockers for after -hours pickup of materials, study/meeting rooms, and the possible use of the existing outdoor patio and other outdoor areas for programs or other passive uses.
3. The pro shop area will be reconfigured to incorporate a bar with a limited food menu of mainly pre-packaged foods. Currently these two areas are segregated at the south end of the building and the new configuration should provide a more open concept where there is good flow between the pro shop and bar area.
4. Every effort should be made to accommodate the above -mentioned uses within the existing envelope of the clubhouse and up to 5,000 sq ft of expansion.
5. Structural modifications to the building should be avoided in the design where possible unless necessary to accommodate the desired layout.
Once provided, the conceptual floor plan will be subject to review by City staff, such as members of the Library and Building Department staff, and other stakeholders such as the pro shop operators who manage the existing golf operation. Feedback regarding functionality and code compliance will then be provided in a cooperative setting and revisions based on this feedback should be anticipated. Once all parties involved agree on the layout, we will move into Phase B.
Phase B: This phase will include completion of full plan package. Based on the agreed upon layout, the selected designer will then proceed with all plans necessary to secure permits and put the project out to bid. This will include the remainder of the architectural pages, mechanical, electrical, plumbing, structural (if necessary), and any other plans required to show compliance with local and state codes and obtain approval for permit issuance.
17 Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
EXHIBIT B
COST PROPOSAL
See Attachment
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial
A
RCHITECT: CLIENT:
PROJECT: RENOVATION AND EXPANSION OF THE EXISTING 13,780 S.F. BUILDING KNOWN AS THE GREEN TREE CLUBHOUSE LOCATED AT 14144 GREEN TREE BLVD., VICTORVILLE, CA
SCOPE: ADDITIONAL SERVICES TO ACCOMMODATE THE PROPOSED EXPANSION TO THE BUILDING BY 5,000 S.F. AT THE PREVIOUSLY PROPOSED RATE OF $ 89 / S.F. 4,300 S.F. PLANNED EXPANSION WITH 700 S.F. CONTINGENCY SPACE
FINAL CONTRACT AMOUNT TO BE CALCULATED ON THE ORIGINAL CONTRACT AMOUNT PLUS THE GROSS S.F. OF EXPANSION X $ 89 / S.F. + FURNITURE SELECTION CONSULTING
DISCIPLINES INCLUDE:
ARCHITECTURAL
CIVIL ENGINEERING (FOR GRADING AND UTILITIES AROUND THE EXPANSION. WQMP FOR THE
IMPROVED AREAS ONLY)
STRUCTURAL ENGINEERING (LIMITED TO ANALYSIS FOR TI AND ENGINEERING FOR THE EXPANSION) MECHANICAL, PLUMBING AND ELECTRICAL ENGINEERING
LANDSCAPE / IRRIGATION DRAWINGS FOR THE AREA AROUND THE EXPANSION ONLY PROJECT MANAGEMENT
ENTITLEMENTS PROCESSING IS NOT INCLUDED AND SHALL BE HANDLED BY THE CITY INDEPENDENTLY
ADDITIONAL SERVICES FOR THE FURNITURE VENDOR DESIGN, SPECIFICATION AND COORDINATION
OF THE PROPOSED FURNITURE (NOTE THAT THIS DOES NOT INCLUDE PROCUREMENT) WHICH WERE NOT INCLUDED IN THE ORIGINAL PROPOSAL NOR THE PROPOSED “EXPANSION RATE” OF $ 89 / S.F.
TR Design Group, Inc.
Thomas Riggle, Architect, License #: C24877
2900 Adams Street, Studio A-400
Riverside, CA 92504
951 – 742 – 7179
City of Victorville
Eddie Gleason, Facilities Manager
14343 Civic
Drive, Victorville, CA 92392
760 – 955 – 5256
EXHIBIT B, COST PROPOSAL, PROJECT CC22-037-A
18/Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A
Additional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial
SC
OPE / INTENT AND EXTENT OF ARCHITECT'S ADDITIONAL SERVICES:
Part A - Phase 01 Conceptual Design
Same Scope as the Original Contract, but for the larger project.
Part B -
Phase 02 & 03
Schematic Design
Not Included nor required for this project.
Part B - Phase 04 Contract Documents
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 05 Bidding Assistance
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 06 Construction Administration
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 07 Post Construction Services
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 08 Permitting
Same Scope as the Original Contract, but for the larger project.
Part B - Phase 09 Project Management Services
Same Scope as the Original Contract, but for the larger project.
ADDITIONAL SERVICES TO THE EXPANSION REQUEST:
Part B - Phase 04 Furniture Selections
Furniture Selection services including:
Meet with and review furniture requirements with the City.
Determine City requirements / availability / needs.
Prepare and specify furniture for bidding.
Coordinate with Client.
Includes up to 15 hours during Construction to review and confirm furniture selections in the field in up to (3) site visits.
EXHIBIT B, COST PROPOSAL, PROJECT CC22-037-A
19/Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A Ad
ditional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial COM
PENSATION FOR ADDITIONAL SERVICES OF THE ARCHITECT:
Shall be FIXED FEE in the amount as follows:
Architectural & Consultant Services Phase Total
Part A - Phase 01 Co nceptual Design 68,537.76$
Part B - Schematic Design
Part B - Phase 04 Contract Documents
Part B - Phase 05 Bidding Assistance
Part B - Phase 06 Construction Administration 376,462.24 Part B - Phase 07 Post Construction Services
Part B - Phase 08 Permitting
Part B - Phase 09 Project Management Services
TOTAL FOR AS / EXPANSION / ORIGINAL SCOPE 445,000.00$
ADDITIONAL SERVICES TO THE EXPANSION REQUEST:
Part B - Phase 04 Furniture Selections 56,250.00$
Architecture TR Design Group
Furniture Selections GMBI - Furniture selection, coordination and specification. Note: This does not include procurement.
Other: Not included.
TOTAL WITH FURNITURE SELECTIONS 445,000.00$
Services on a Time and Materials basis will periodically be billed at the hourly rate schedule within. $
EXHIBIT B, COST PROPOSAL, PROJECT CC22-037-A
20/Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A Ad
ditional Services Change Order #01
January 9, 2023 TRD 21-067.01
This page is part of the Agreement for the Provision of Limited Professional Services _______ Initial BAS
IS OF COMPENSATION:
FOR BASIC SERVICES, as described above, Basic Compensation shall be computed as follows:
F IXED FEE IN THE AMOUNT OF:
FOR PHASES 01 – 09 WITH SCOPE IN THEM AS NOTED ABOVE:
Four Hundred Forty Five Thousand Dollars and No Cents, $445,000.00, plus reimbursable expenses.
F
OR PHASE 04 – FURNITURE SELECTION SERVICES ONLY:
Fifty Six Thousand Two Hundred Fifty Dollars and No Cents, $56,250.00, including the reimbursable expenses budget.
FOR THE PHASES WITH SCOPE IN THEM NOTED ABOVE INCLUDING THE REIMBURSABLES BUDGET:
Five Hundred Twelve Thousand Three Hundred Seventy Five Dollars and No Cents, $512,375.00, including the reimbursable expenses budget.
P
AYMENT SCHEDULE:
$ 68,537.76 plus Reimbursables due during PART A - Conceptual Design $ 376,462.24 plus Reimbursables due during the project per the PART B - Original Scope billing $ 445,000.00 TOTAL plus Reimbursables
$ 56,250.00 plus Reimbursables due during PART B - Furniture Selections $ 501,250.00 TOTAL including Project Management Services plus Reimbursables $ 11,125.00 Reimbursables Budget
$ 512,375.00 TOTAL with Reimbursables Budget
COMPENSATION FOR FURTHER ADDITIONAL SERVICES beyond those listed in the basic services will be billed on an hourly basis as described in The Terms and Conditions.
COMPENSATION FOR SERVICES OF THE ARCHITECTS CONSULTANTS: All Consultants (if engaged as part of the Scope) including, but not limited to, civil, landscape, structural, mechanical, plumbing and electrical engineering shall be a multiple of one and twenty-five one-hundredths (1.25) times the amounts billed to the Architect for such services.
REIMBURSABLE EXPENSES:
F
OR REIMBURSABLE EXPENSES, a multiple of one and fifteen one hundredths (1.15) times the expenses incurred by the Architect, the Architect's employees and consultants in the interest of the project. Reimbursable will periodically be billed.
Reimbursables Budget As Required (usually less than 2.5% of contract amount) 11,125.00$ EXHIBIT B, COST PROPOSAL, PROJECT CC22-037-A
21/Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A TR DESIGN GROUP, INC.
951-742-7179
951-742-7178
[email protected]
THOMAS RIGGLE
PRESIDENT
10/22/21
THOMAS RIGGLE
FOR THE CONCEPTUAL DESIGN WHETHER OR NOT IT INCLUDES AN
EXPANSION TO THE BUILDING
AN EXPANSION TO THE BUILDING
FOR THE PROJECT BASED ON 1ST FLOOR MODIFICATIONS, NO
STRUCTURAL UPGRADES AND NO EXPANSION BEYOND SOMETHING
SIMILAR TO OUR CONCEPT PRESENTED.
FOR AND EXPANSION OF UP TO 1,000 S.F. AND NO STRUCTURAL UPGRADES TO THE EXISTING BUILDING.
An Additional
89,250
82,262.50
383,639.98
465,902.48
TOTAL PHASES A + B
(INCLUDES OPTIONAL PROJECT MANAGEMENT SERVICES)
1/7/22
REVISED
EXHIBIT B, COST PROPOSAL, PROJECT CC22-037-A
22/Consultant/Professional Services Provider Agreement/TR Design Group, Inc./Project CC22-037-A Item Number: 19
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Agreement with Fenagh Engineering & Testing for Material Testing - Guardrail Project Recommendation:
That the Honorable City Council approve a Consultant / Professional Services Provider Agreement with Fenagh Engineering & Testing in an amount not to exceed $14,976.00 for construction material testing for the City’s Guardrail Project (CC23-024).
Fiscal Impact:
This action will result in a fiscal impact of $14,976.00. An additional appropriation is not required. Funds for these services are budgeted in Measure I, Fund 250, for the Guardrail Project. The material testing services will be billed on a time and material basis. The account numbers and available budget are shown in the table below.
Account Number Available Budget
2504500-55330-60129 $19,880.84
Strategic Plan Goal:
This project aligns with Goal E, Strategy 1 in the City of Victorville Strategic Plan 2020- 2023, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.”
Background:
On December 6, 2022, City Council awarded a construction contract (CC23-024) to Danny C. Hubbs for the Guardrail Project. Capital improvement projects require quality assurance materials testing to ensure materials incorporated into the work satisfy the contract specification and special provisions. This process helps ensure the materials provided by the contractor and the quality of the work performed will meet the life expectancy of the improvement. This project will require soil inspection and material testing by a qualified geotechnical consultant. The consultant’s certified inspectors will 2 9
3 5
report on testing of soils, crushed rock bases, asphalt, concrete, and construction activities to determine if the materials provided and installed meet the requirements of the contract specifications.
Discussion:
On December 1, 2022, a Request for Qualification (RFQ) for a Geotechnical Material Consultant for the Guardrail Project was issued. The RFQ was issued using procedures in accordance with Municipal Code §2.28.280. On December 16, 2022, nine responses from geotechnical consultants were received.
Each proposal was reviewed by Engineering Department staff to determine which geotechnical consultant best met the needs of the projects and City for the services requested. Based on qualifications, staff resources, and the unit rates included in the fee schedules, staff determined that Fenagh Engineering & Testing was the best fit consultant for this project.
This agreement is being presented to Council for approval because the City has other contracts with Fenagh Engineering & Testing which cumulatively exceed the City Manager’s purchasing authority of $125,000.00 per the City’s Municipal Code §2.28.060 (e)(3)(a).
Staff recommends that the City Council approve a Consultant / Professional Services Provider Agreement with Fenagh Engineering & Testing in an amount not to exceed $14,976.00 for Geotechnical Materials Consultant for the Guardrail Project.
Staff remains available to answer any questions the Council may have.
Attachment: A. Agreement
ATTACHMENT A
1 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENTBY AND BETWEEN THE CITY OF VICTORVILLE AND FENAGH ENGINEERING & TESTING FOR GEOTECHNICAL MATERIAL CONSULTANT FOR GUARDRAIL, PROJECT CC23-073 THIS CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENT (hereinafter “Agreement”), is made and entered into by and between THE CITY OF VICTORVILLE, a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as the “City”, and Fenagh Engineering & Testing, an LLC, hereinafter referred to as “Consultant.” City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties.” RECITALS: WHEREAS, the City requires a Geotechnical Material Consultant for Guardrail Project; and WHEREAS, Consultant represents that it is fully qualified to perform the consulting and/or professional services required for performance under this Agreement by virtue of its experience and the training, education and expertise of its principals and its employees; and WHEREAS, in light of the facts set forth above, the City desires to retain the services of a qualified Consultant to provide, on an independent contractor basis, Geotechnical Material Consultant for Guardrail Project; and NOW THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES HERETO AGREE AS FOLLOWS: Section 1. RECITALS The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth fully herein. Section 2. SCOPE OF SERVICES Consultant shall provide to the City those services set forth in the Scope of Services, attached hereto as Exhibit “A” and incorporated as part of this Agreement by this reference. 2 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 The City shall pay to Consultant a sum not to exceedFourteen Thousand Nine Hundred Seventy-six and 00/100 Dollars ($14,976.00 for faithful performance of the services to be rendered under this Agreement, subject to the Proposal provisions of Section 4, below. No expense reimbursements, including, but not limited to, reimbursements for travel, parking, lodging, and/or meals shall be paid to Consultant unless such expense reimbursements: (i) are specifically provided for and described by nature and type in Exhibit “B”, below; (ii) appear on Consultant’s monthly invoices to City; (iii) are supported by the appropriate receipts and other such documentation as the City shall require; and (iv) are directly related to the Scope of Services to be performed under this Agreement. In addition, any and all reimbursements shall be made in accordance with any City policy governing same. Section 4. COST PROPOSALThe City shall pay Consultant as provided in the Cost Proposal, attached hereto as Exhibit “B” and incorporated as part of this Agreement by this reference, subject to the provisions of Section 5. The provisions of Exhibit “B” notwithstanding, in order to receive payments, Consultant shall be required to submit to the City detailed monthly invoices which include, if applicable, a description of all services/tasks performed, the number of hours expended on each service/task, the name of the person performing the service/task, and expense reimbursement information, if any, as required by Section 3, above. Provided that services have been satisfactorily rendered, invoices shall be paid by the City approximately thirty (30) working days following receipt of Consultant’s invoice. Section 5. STATE PREVAILING WAGE AND RELATED LABOR PROVISIONS a. Compliance with State Prevailing Wage Law. Pursuant to California Labor Code Section 1773, the City has obtained from the Director of the Department of Industrial Relations (“DIR”) the general prevailing rate of per diem wages and the general prevailing wage rate for holiday and overtime work applicable for each craft, classification, or type of worker in San Bernardino County, California, where the Project is to be performed. Copies of these prevailing rate of per diem wages are on file at the City of Victorville Finance Department/Purchasing Division and shall be made available for review to any interested party on request. Copies of these prevailing rate of per diem wages are also available from the State of California via the internet at http://www.dir.ca.gov/DLSR/PWD. Consultant and its subconsultants/subcontractors shall pay not less than said specified prevailing rate of per diem wages to all workers employed by them in the performance of any work under this Agreement which constitutes “public works” or “public work”, including without limitation, the Geotechnical Material Consultant for Guardrail Project, and any other work or services described in or encompassed by California Labor Code (“Labor Code”) Sections 1720 through 1720.9, 1771, and 1772. Consultant shall be solely responsible for using the correct and current prevailing wage rates and performing accordingly. An error on the part of any awarding body does not relieve the Consultant from the responsibility for payment of the correct prevailing wage, or compliance with the maintenance and inspection of payroll records, posting of prevailing wage rates at the work/job site, employment of apprentices, and other requirements of Labor Code Section 1720 et seq.; Labor Code Section 1810 et seq.; California Code of Regulations, Title 8, Section 16000 et seq.; and all other applicable State labor laws. b. Designation as Consultant Not Determinative. For purposes of this Agreement, Consultant its subconsultants or subcontractors shall be subject to and shall comply with all provisions of the Labor Code applicable to contractors and subcontractors when they are engaged in the performance of any work under this Agreement which constitutes “public works” or 3 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 “public work” as defined in subsection a above, despite being designated as a Consultant or subconsultant herein. c. Conflict. It is further expressly agreed by and between the Parties hereto that should there be any conflict between the provisions of this Section 5 and the terms of Exhibit “A” or Exhibit “B” of this Agreement, the provisions of this Section 5 shall control, and nothing herein shall be considered as an acceptance of the terms of Consultant’s Scope of Services, Scope of Work, or Cost/Bid Proposal which conflict with the provisions of this Section 5. d. Payroll Records. Consultant and its subconsultants/subcontractors must comply with the provisions of Labor Code sections 1776 and 1812 and all implementing regulations, including without limitation, those set forth in Title 8 of the California Code of Regulations, Section 16000 et seq. (hereinafter the “Regulations”), which are fully incorporated by this reference, including requirements for electronic submission of payroll records to the DIR. (1) Consultant and Subconsultant/Subcontractor Obligations. Consultant and each subconsultant or subcontractor must keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the Work. Each payroll record must contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (a) The information contained in the payroll record is true and correct; and (b) Consultant and or subconsultant/subcontractor has complied with the requirements of Labor Code Sections 1771, 1811, and 1815 for any covered work performed by its employees on the Project. (2) Certified Record. A certified copy of an employee’s payroll record must be made available for inspection or furnished to the employee or his or her authorized representative on request, to the City, to the Division of Labor Standards Enforcement, to the Division of Apprenticeship Standards of the DIR, and as further required by the Labor Code. (3) Enforcement. Upon notice of noncompliance with Labor Code Section 1776, Consultant and/or subconsultant/subcontractor has ten days in which to comply with the requirements of this section. If Consultant and/or subconsultant/subcontractor fails to do so within the ten-day period, Consultant and/or subconsultant/subcontractor will forfeit a penalty of $100.00 per day, or portion a day, for each worker for whom compliance is required, until strict compliance is achieved. Upon request by the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement, these penalties will be withheld from payments then due to Consultant and/or subconsultant/subcontractor. (4) Payment of Invoices. Copies of the certified payrolls, proof of payroll submissions, and appropriate lien releases are required with each invoice to the City. Payment of the invoice may be delayed when payroll-related documents and/or lien releases are not included with the invoice. 4 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 e. Apprentices. Consultant is responsible for compliance with the requirements governing employment and payment of apprentices, as set forth in Labor Code section 1777.5, which is fully incorporated by reference. f. Notices. Pursuant to Labor Code section 1771.4, Consultant is required to post all Job Site notices, including prevailing wage rates and other notices, as required by regulation. g. Other Labor Requirements. Consultant has the responsibility for and shall comply with all other applicable requirements of Labor Code Section 1720 et seq., Labor Code Section 1810 et seq., the Regulations, and all other applicable State labor laws. Consultant further acknowledges and agrees that it will be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with those laws. Consultant shall require the same of all its subconsultants or subcontractors. h. Statutory Penalties. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hours laws will be enforced as follows: (1) Pursuant to Labor Code section 1775, the Consultant and any subcontractor/subconsultant under it shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under this Agreement by it or by any subcontractor/subconsultant under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Consultant and/or subconsultant/subcontractor as provided for in Section 1775. (2) Pursuant to Labor Code Section 1813, Consultant and its subconsultants or subcontractors shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the respective Consultant or subconsultant/subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week, except as specified in Labor Code Section 1815. In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. i. DIR Monitoring. Pursuant to Labor Code Section 1771.4, this Agreement is subject to compliance monitoring and enforcement by the DIR. j. DIR Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and its subconsultants/subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Agreement, Consultant represents that it is aware of the registration requirement and is currently registered with the DIR. Consultant shall maintain a current registration for the duration of the Agreement. Consultant shall further include the requirements of Labor Code Sections 1725.5 and 1771.1 in any subcontract and ensure that all subconsultants/subcontractors are registered at the time this Agreement is entered into and maintain registration for the duration thereof. 5 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Section 6. TERM OF AGREEMENTThis Agreement shall be for an Initial Term of commencing on the date of full execution of the Agreement (the “Commencement Date”) and expiring on December 31, 2023 (the “Termination Date”) (the “Term”), unless terminated earlier pursuant to Section 21 of this Agreement. From and after the Termination Date, and upon subsequent Agreement by the Parties, this Agreement may continue on a month-to-month basis until terminated pursuant to Section 21 below. Section 7. INDEPENDENT CONTRACTOR STATUSIt is the express intention of the Parties that Consultant is an independent contractor and not an employee, agent, joint venture, or partner of the City. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between the City and Consultant or any employee or agent of Consultant. Both Parties acknowledge that Consultant is not an employee for state or federal tax purposes or any other purpose. Consultant shall retain the right to perform services for others during the term of this Agreement. Section 8. REPRESENTATIONS AND ACKNOWLEDGMENTS REGARDING INDEPENDENT CONTRACTOR’S STATUS OF CONSULTANT a. Consultant represents and acknowledges the following: (1) The City is not required to provide any training or legal counsel to Consultant or its employees in order for Consultant to perform the services described in this Agreement. (2) Performance of the services described in this Agreement does not have to be integrated into the daily business operations of the City. (3) The services described in this Agreement can be performed without the use of City equipment, materials, tools, or facilities, unless otherwise provided under a separate Agreement. (4) Nothing in this Agreement shall be interpreted to imply that the City must maintain any contractual relationship with Consultant on a continuing basis after termination of this Agreement. (5) The City will not be requested or demanded to assume any liability for the direct payment of any salary, wage, or other such compensation to any person employed by Consultant to perform the services described in this Agreement. (6) Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are employees of the City. b. The City represents and acknowledges the following: (1) Consultant is solely responsible for determining who, under the supervision or direction of Consultant, will perform the services set forth in this Agreement. 6 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 (2) The City will not hire, supervise, or pay any employees or assistants working for Consultant pursuant to this Agreement. Nothing contained in this Agreement shall prevent the City from hiring Consultant’s employees or assistants after termination of this Agreement. (3) Nothing in this Agreement shall be interpreted to imply that Consultant must maintain any contractual relationship with the City on a continuing basis after termination of this Agreement. (4) It is the sole responsibility of Consultant to set the hours in which Consultant performs or plans to perform the services set forth in this Agreement. (5) Consultant is not required to devote full time to the business operations of the City in order to perform the services set forth in this Agreement. (6) Unless deemed necessary under certain circumstances, Consultant is not required to perform the services set forth in this Agreement at City Hall or on City-owned property. (7) Other than attendance at required public meetings and public hearings, and complying with the provisions of the Proposal set forth in Exhibit B and any procedural requirements set forth by law, Consultant is not required to perform the services set forth in this Agreement in any particular order or sequence. (8) Nothing in this Agreement shall be interpreted to preclude Consultant from working for other persons or firms, provided that such work does not create a conflict of interest. Section 9. NOT AGENT OF THE CITY a. Nothing contained in this Agreement shall be deemed, construed, or represented by the City or Consultant or by any third person to create the relationship of principal and agent. b. Consultant shall have no authority, express or implied, to act on behalf of the City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind the City to any obligation whatsoever. Section 10. LICENSES AND PERMITS Consultant represents that it has obtained and will maintain at all times during the Initial Term (and during the Option Period, if applicable) of this Agreement all business licenses, including but not limited to a City of Victorville business license, professional licenses or certifications, or permits necessary for performing the services described in this Agreement. Section 11. STANDARD OF PERFORMANCE; WARRANTY a. Consultant agrees to perform all services required by this Agreement in a professional and competent manner, in accordance with the degree of skill and diligence which is normally employed by reputable professionals performing similar services under similar conditions in the same or similar locality. Such services shall also be performed in a manner which is reasonably satisfactory to Brian Gengler, City Engineer, or his designee. b. By executing this Agreement, Consultant warrants that it:
7 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 (1) Has thoroughly investigated and considered the services and work to be performed; (2) Has investigated the issues regarding the scope of services to be provided; (3) Has carefully considered how the services and related work should be performed; and (4) Fully understands the facilities, difficulties and restrictions associated with performance of the services required by this Agreement. Section 12. FAMILIARITY WITH WORK Should Consultant discover any latent or unknown conditions materially differing from those inherent in the services or as represented by the City, Consultant shall immediately inform the City of such fact and shall not provide any services, except at Consultant's risk, until written instructions are received from Brian Gengler, City Engineer, or his designee. Section 13. CONFLICTS OF INTEREST Consultant covenants that it does not have any interest, nor shall it acquire any interest, directly or indirectly, which would conflict in any manner with the performance of Consultant’s services under this Agreement. Consultant further covenants that in the performance of services under this Agreement, no officer, employee or agent of Consultant having such interest shall be employed by it. In the event the City determines that Consultant must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests, Consultant shall file such Form 700 with the City Clerk’s Office pursuant to the written instructions provided by the City Clerk. Acquisition or maintenance of a conflicting interest by Consultant may result in termination of this Agreement by the City. Section 14. COMPLIANCE WITH LAWS Consultant shall comply with all local, state, and federal laws and regulations applicable to the services to be rendered hereunder, including any rule, regulation, or bylaw governing the conduct or performance of Consultant or its employees, officers, or board members. Section 15. COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY INSURANCE a. Consultant shall procure and maintain at its own expense, during the Initial Term of this Agreement (and during the Option Period, if applicable), Commercial General Liability Insurance, of not less than One Million Dollars ($1,000,000) per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by Consultant or its officers, employees, servants, volunteers, and agents and independent contractors. b. Consultant shall further procure and maintain, at its own expense, during the Initial Term of this Agreement, (and during the Option Period, if applicable), Commercial Vehicle 8 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Liability Insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) combined single limit, covering any vehicle utilized by Consultant or its officers, employees, servants, volunteers, agents and independent contractors in performing the services required by this Agreement. Section 16. WORKERS' COMPENSATION INSURANCE a. Consultant shall procure and maintain at its own expense, during the Initial Term of this Agreement (and during the Option Period, if applicable), Workers' Compensation Insurance, providing coverage as required by the California State Workers' Compensation Law. b. If any class of employees employed by the Consultant pursuant to this Agreement is not protected by the California State Workers' Compensation Law, Consultant shall provide adequate insurance for the protection of such employees to the satisfaction of the City. Section 17. PROFESSIONAL LIABILITY INSURANCE a. Professional Liability Insurance or Errors and Omissions insurance as appropriate to Consultant’s profession shall be required and written on a policy form specifically designed to provide coverage for and protect against the negligent acts, errors and omissions of the Consultant in the performance of the services required by this Agreement. A minimum limit of $1,000,000 per claim and in the aggregate must be provided. Section 18. ADDITIONAL INSURED Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, all insurance policies, except for the Workers' Compensation and Professional Liability, shall be endorsed to name the City and its officers, employees, servants, volunteers, agents and independent contractors, including, without limitation, the City Attorney, as Additional Insureds. Section 19. WAIVER OF SUBROGATION RIGHTS Consultant shall require the carriers of all required insurance policies, with exception to Professional Liability, to waive all rights of subrogation against the City and its officers, employees, servants, volunteers, agents, and independent contractors and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver. Section 20. PROOF OF INSURANCE COVERAGE; REQUIRED ENDORSEMENTS a. Consultant shall secure from a good and responsible company or companies authorized to transact insurance business in the State of California, the policies of insurance required by this Agreement and furnish to the City Clerk certificates of insurance evidencing the required coverage, and policy endorsements at least one (1) business day prior to the commencement of any services to be performed under this Agreement. b. The policies and certificates of insurance shall be endorsed to provide that in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days 9 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 before the cancellation or amendment is effective. In the case of cancellation for non-payment, ten (10) days advance written notice shall be given. c. Each policy and certificate of insurance shall be endorsed to provide that the policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration. d. Each policy and certificate of insurance shall be endorsed to provide that the policy will be maintained throughout the Initial Term (and during the Option Period, if applicable), of this Agreement. e. The Commercial General Liability and Vehicle Liability policies shall be endorsed to contain the following provision: “For any claims related to this Agreement, Consultant’s coverage shall be primary with respect to the City. Any insurance maintained by the City shall be in excess of Consultant’s insurance and shall not contribute with it.” Section 21. TERMINATION OR SUSPENSION a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination. b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination. Section 22. TIME OF THE ESSENCE Time is of the essence in the performance of this Agreement. Section 23. INDEMNIFICATION a. Except as set forth in Subsection b of this Section 23, and to the fullest extent permitted by law, Consultant shall immediately defend, indemnify, and hold harmless the City, its officers, employees, representatives, and agents (the “City Indemnitees”), from and against those actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and reasonable attorneys’ fees, for any personal injuries, deaths, or property damage, including property owned by the City (collectively “Claims”) which may arise out of Consultant's negligence or willful misconduct in the performance of the services described in this Agreement, unless such Claims are proven to be caused by the negligence or willful misconduct of the City Indemnitees. b. The provisions of this Subsection b apply only in the event that Consultant is a design professional within the meaning of California Civil Code section 2782.8 (“Design Professional”). The term Design Professional, as defined in said section, is limited to licensed 10 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 architects, licensed landscape architects, registered professional engineers, professional land surveyors, and the business entities that offer such services in accordance with the applicable provisions of the California Business and Professions Code. (1) Notwithstanding the provisions of Subsection a above, to the extent that the services to be provided under this Agreement are those of a Design Professional, Consultant's duty to indemnify, hold harmless, and defend the City Indemnitees shall be limited to the extent that any Claims arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, its officers, agents, employees or subconsultants in the performance of the services described in this Agreement. (2) In no event shall the costs of defense charged to Consultant exceed the Consultant’s proportionate percentage of fault, except as otherwise set forth in said Civil Code section 2782.8, the provisions of which are incorporated into this Agreement by this reference. Nothing in this Subsection b shall be construed to require Consultant to provide indemnification for Claims caused by the active negligence or willful misconduct of the City Indemnitees. c. The City does not and shall not waive any rights that it may have against Consultant under this Section, because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions of this Section 23 shall apply regardless of whether said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost, or expense described herein. d. The obligation to indemnify and defend, as set forth in this Section 23, is binding on the successors, assigns, or heirs of Consultant and shall survive the expiration or any early termination of this Agreement. Section 24. REPORTS Upon request by Brian Gengler, City Engineer, or his designee or as otherwise required by this Agreement, including but not limited to, the Scope of Services set forth in Exhibit “A”, Consultant shall prepare and submit reports to the City concerning Consultant's performance of the services required by this Agreement. Section 25. RECORDS a. Consultant shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Brian Gengler, City Engineer, or his designee, to evaluate the cost and the performance of such services. b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles. c. Brian Gengler, City Engineer, or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records. d. Records and supporting documents pertaining to the use of funds paid to Consultant hereunder shall be retained by Consultant and made available to Brian Gengler, 11 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 City Engineer, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement. Section 26. RESERVED Section 27. CONFIDENTIALITY; OWNERSHIP OF WORK a. Any and all documents and information obtained from the City or prepared by Consultant for the City shall be kept strictly confidential unless otherwise provided by applicable law. All City data, documents and information shall be returned to the City upon termination of the Agreement. b. Any drawings, specifications, reports, records, documents, or other materials prepared by Consultant in the performance of services under this Agreement shall not be released publicly without the prior written approval of Brian Gengler, City Engineer, or his designee, or as required by applicable law. c. Consultant shall not disclose to any other entity or person any information regarding the activities of the City, except with the prior written approval of Brian Gengler, City Engineer, or his designee, or as required by applicable law. d. All original documents, reports, designs, computer files and all other materials prepared by Consultant in the course of performing the services pursuant to this Agreement, whether completed or in progress, are the property of the City and shall be surrendered to the City upon the completion of Consultant’s services or when requested by Brian Gengler, City Engineer, or his designee. Such materials may be used, reused or otherwise disposed of by the City without the permission of Consultant. e. Consultant’s covenants under this Section 27 shall survive the termination of this Agreement. Section 28. PRINCIPAL REPRESENTATIVES a. Martin B. Lowenthal, Regional Vice President, is designated as the principal representative of Consultant for purposes of communicating with the City on any matter associated with the performance of the services set forth in this Agreement. b. Brian Gengler, City Engineer, or his designee shall be the principal representative of the City for purposes of communicating with Consultant on any matter associated with the performance of the services set forth in this Agreement. c. Either Party may designate another individual as its principal representative by giving written notice of such designation to the other Party. Section 29. MODIFICATIONS AND AMENDMENTS; EXTRA SERVICES a. This Agreement may be modified or amended only by a written instrument signed by both Parties. b. During the Initial Term, the City may request that the Consultant perform Extra Services. As used herein, "Extra Services" means any services, which are determined by the 12 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 City to be necessary for the proper completion of Geotechnical Material Consultant for Guardrail Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. A written instrument signed by both Parties shall be required to authorize performance of and payment for Extra Services. Section 30. ENTIRE AGREEMENT a. This Agreement supersedes any and all prior or contemporaneous Agreements, either oral or written, between the City and Consultant with respect to the subject matter of this Agreement. b. This Agreement contains all of the covenants and Agreements between the Parties with respect to the subject matter of this Agreement, and each Party to this Agreement acknowledges that no representations, inducements, promises, or Agreements have been made by or on behalf of any Party, except those covenants and Agreements in this Agreement. c. No Agreement, statement, or promise with respect to the subject matter of this Agreement, which is not contained in this Agreement, or in a valid modification or amendment to this Agreement, shall be valid or binding on either Party. Section 31. AMBIGUITIES This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them. Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement. Notwithstanding the foregoing, the Parties agree that Exhibit “B” is attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this Consultant/Professional Services Standard Provider Agreement and Exhibit “B” the terms of this Consultant/Professional Services Standard Provider Agreement shall control and nothing set forth in Exhibit “B” shall be deemed to supersede any of the provisions of this Consultant/Professional Services Standard Provider Agreement. Section 32. NOTICES a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows: To the City: Brian Gengler, City Engineer City of Victorville 14343 Civic Drive Victorville, CA 92392 13 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 To Consultant: Martin B. Lowenthal, Regional Vice President, Fenagh Engineering & Testing 9070 Center Avenue Rancho Cucamonga, CA 91730 b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail. Section 33. NON-LIABILITY OF CITY OFFICERS AND EMPLOYEES No officer or employee of the City shall be personally liable to Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount, which may become due to Consultant or to its successor(s), or for any breach of any obligation of the terms of this Agreement. Section 34. REVIEW BY ATTORNEYS Each Party hereto has had its attorney(s) review this Agreement and all related documents. Each Party hereto has consulted with its attorney(s) and has negotiated the terms of this Agreement based on such consultation. Section 35. WAIVER a. No waiver shall be binding unless executed in writing by the Party making the waiver. b. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. c. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of such provision or any of the remaining provisions of this Agreement. Section 36. ASSIGNMENT This Agreement shall not be assigned by either Party without prior written consent of the other Party. Section 37. CARE OF WORK The performance of services by Consultant or the payment of money by the City shall not relieve Consultant from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such incomplete, inaccurate or defective work is due to the negligence of Consultant. 14 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Section 38. CAPTIONS AND HEADINGSThe captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading. Section 39. SUCCESSORS, HEIRS, AND ASSIGNS Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties. Section 40. GENDER In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another. Section 41. SEVERABILITY If any one or more of the sentences, clauses, paragraphs, or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair, or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein. Section 42. GOVERNING LAW The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law. Section 43. DEFAULT a. Failure or delay by any Party to this Agreement to perform any material term or provision of this Agreement shall constitute a default under this Agreement; provided however, that if the Party who is otherwise claimed to be in default by the other Party commences to cure, correct, or remedy the alleged default within fifteen (15) days after receipt of written notice specifying such default and shall diligently complete such cure, correction, or remedy, such Party shall not be deemed to be in default hereunder. b. The Party claiming that a default has occurred shall give written notice of default to the Party in default, specifying the alleged default. Delay in giving such notice shall not constitute a waiver of any default nor shall it change the time of default; provided, however, the injured Party shall have no right to exercise any remedy for a default hereunder without delivering the written default notice, as specified herein. c. Any failure or delay by a Party in asserting any of its rights or remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default. 15 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 d. In the event that a default by any Party to this Agreement may remain uncured for more than fifteen (15) days following written notice, as provided above, the injured Party shall be entitled to seek any appropriate remedy or damages by initiating legal proceedings. Section 44. CUMULATIVE REMEDIESExcept with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party. Section 45. VENUE All proceedings involving disputes over the terms, provisions, covenants, or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California. Section 46. ATTORNEYS’ FEES In the event any action, suit, or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement, or as a result of any alleged breach of any provision of this Agreement, the prevailing Party in such suit or proceeding shall be entitled to recover its costs and expenses, including reasonable attorneys’ fees, from the losing Party, and any judgment or decree rendered in such a proceeding shall include an award thereof. Section 47. EFFECTIVENESS OF AGREEMENT This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Consultant, approved by the City’s Risk Manager, and executed by the authorized City personnel or Mayor. Section 48. REPRESENTATIONS OF PARTIES AND PERSONS EXECUTING AGREEMENT a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto. b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent. Section 49. COUNTERPARTS This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement. (END OF THIS PAGE) 16 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below. THE CITY OF VICTORVILLE FENAGH ENGINEERING & TESTING By:______________________________ By:_____________________________ Debra Jones, Michael B. Lowenthal, Mayor Vice President Dated: ___________________________ Dated:__________________________ ATTEST By:______________________________ Jennifer Thompson, City Clerk Dated:___________________________ THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM: By: _______________________________ By: ____________________________ Lee Brown, Andre de Bortnowsky, Risk Manager City Attorney Dated:______________________________ Dated:__________________________ 17 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 EXHIBIT A SCOPE OF SERVICES City agrees to engage Consultant and Consultant agrees to furnish all necessary labor, tools, materials, and equipment to perform the services as generally described in the Request Quote for the Project CC23-073, portions of which are attached hereto for ease of reference as Exhibit "A", and the entirety of which is currently on file in office of the City Clerk; and (ii) the prices set forth in Consultant’s Bid Proposal (attached as Exhibit "B.
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions Geotechnical Material Consultant for Guardrail Project
EXHIBIT A
1/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions Geotechnical Material Consultant for Guardrail Project
EXHIBIT A
/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions Geotechnical Material Consultant for Guardrail Project
EXHIBIT A
2/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions Geotechnical Material Consultant for Guardrail Project
EXHIBIT A
2/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions Geotechnical Material Consultant for Guardrail Project
EXHIBIT A
2/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 EXHIBIT B COST PROPOSAL See Attachment
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com
COST PROPOSAL FORMCI T Y O F VI C T O R V I L L E, CAL I F O R N I A Section D Forms Geotechnical Material Consultant for Guardrail Project 8 Hours$175.004 Hours$65.0016 Hours$65.008 Hours$25.008 Hours$65.0040 Hours$98.0012 Hours$98.0040 Hours$98.005 Each$100.002 Each$140.002 Each$100.002 Each$140.001 Each$140.005 Each$20.002 Each$175.001 Each$140.001 Each$375.001 Each$175.00$14,976.00Fenagh Engineering & TestingMartin B. Lowenthal Regional VP 12/14/2022 $1,400.00$260.00$1,040.00$200.00$520.00$3,920.00$1,176.00$3,920.00$500.00$280.00$200.00$280.00$140.00$100.00$350.00$140.00$375.00$175.00
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard Discounted* FIELD INSPECTION SERVICES National Code Rate/Hour Rate/HourSteel Visual Welding $150.00Steel Visual Bolting $150.00Nondestructive - UT, MT, PT $150.00Steel Visual/NDT Combination $150.00Concrete ACI Sampling $150.00$98.00Concrete ICC/ACI-II (Rebar/Placement) $150.00$98.00Concrete PT $150.00Masonry $150.00Fireproofing (Thickness/Density) $150.00Firestopping/Fire-safing $150.00Soil Technician w/Nuclear Gauge and/or Sand Cone $150.00$98.00Asphalt Technician w/Nuclear Gauge $150.00$98.00Roofing & Weatherproofing/Waterproofing $150.00Structural Wood Framing $150.00Shotcrete $150.00Fiber Reinforced Concrete (FRP) $150.00Multi-Disciplined Inspector $150.00Specialty Inspector where certification not above is required $150.00Quality Control Manager $155.00ASNT Level III $175.00Laboratory Technician/Sample Runner $150.00Project Coordinator $150.00Technician Typist $150.00**PROFESSIONAL SERVICESPrincipal Engineer (Civil/Structural) $325.00Geotechnical Engineer $245.00$175.00Consulting Engineer (Envelope) $295.00Associate Engineer, Licensed $225.00Project Geologist $225.00Project Manager $225.00$65.00Staff Engineer $225.00Field Inspection Manager $200.00$65.00Laboratory Manager $150.00$65.00SPECIAL SERVICESPortable and Mobile Laboratories, Concrete and Soils QOR*** Off-Site Structural Steel or Precast Fabrication $185.00* Epoxy Bolt Proof Load/Pull Testing $135.00* Expansion Anchor Proof Load/Torque Testing $135.00* Coring, 1 Person (including equipment) $325.00* Coring, 2 Persons (including equipment) $425.00Engineering Project Research QORGeotechnical Site Investigations/Foundation Reports $7,500.00Floor Flatness Testing FF/FL $295.00Floor Flatness Testing FF/FL - Report Fee $500.00Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $100/KitASTM F1869 $115.00Relative Humidity Testing - ($100/kit) ASTM F2170 $115.00GPR (Ground Penetrating Radar) $350.00Concrete Crack Gauge Monitoring $350.00Water Penetration of Windows, Skylights, Doors and Curtain Walls by Uniform or Cyclic Pressure ASTM E1105 $2,850.00Air and Water Infiltration Leakage Testing AMMA 501.2 $2,850.00Electronic Leak Detection of Roof (Vector Mapping) QORAir Content Test Equipment $100.00Slump & Temperature Equipment $100.00Fireproof Density and Adhesion/Cohesion Inspection Kit $100.00Administration, Accounting, Special Projects, Notary, Certified Payroll $125.00$25.00Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $350.00Welding Procedure Review (less than 48 hours notice - $500) $350.00Welder Qualification Test Record AWS $1,000.00Geotechnical Pad Letter (less than 48 hours notice - $2,000) $1,500.00Final Letter (less than 48 hours notice - $2,000) $1,500.00Expert Witness Court appearance, per day $2,400.00 FEE SCHEDULE - CITY OF VICTORVILLE RFQ CC23-073 12/16/2022PERSONNEL FEES AND BASIS OF CHARGESINSPECTIONS, ENGINEERING & SPECIAL SERVICES * Field inspection services will be billed in accordance with minimums shown on Basis of Charges. **Professional engineering services and laboratory technician services will be billed at actual time. *** All plant inspections are located within 50 miles of the project location. Steel shops will be AISC certified and concrete plants will be PIC certified. **** Two inspections performed by the same inspector during a site visit will be billed at the combination rate.***** Three or more inspections performed by the same inspector during a site visit will be billed at the multi-disciplined rate.All fees subject to Basis of Charges
EXHIBIT B
COST PROPOSAL FORM
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com GENERALMINIMUM HOURLY CHARGES INSPECTIONTechnician personnel and the following minimum charges are contractual commitment:Job Cancel/Show-up time 2 Hours Reinspection time 1.25 x quoted hourly rateWORKING HOURS AND PREMIUM TIMERegular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows:Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rateOvertime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rateOvertime Sundays (over 8 hours) and Holidays 3 x quoted hourly rateShift differential, swing and graveyard - (Work performed between 2:00 pm and 4:00 am) 1.5 x quoted hourly rateMISCELLANEOUS CHARGES - Only Where ApplicableNotary Services Fee $25.00/eachFacsimile Charges. Plus $1.00/page (n/c for cover page) $5.00 minimumWireless Router/Data Card for Jobsite Internet $100.00/dayParking Fees At CostAir Travel Cost Plus 5%Outside Services Cost Plus 20%Per Diem $125.00/dayMileage Standard Federal RateTrip Charge $200/daySample Pickup $40.00/Per Sample$100/Per TripWeekend Sample Pickup $75.00/hourProject Administration 7% of Monthly InvoiceSamples Made by Others $110 + Test CostLaboratory Sample Witness Fee $100.00EZ Cure Boxes (Thermostatically Controlled Curing Boxes) QORReturned Check Fee $100.00Expedited Dispatch Request (inspections scheduled less than 12 hours notice) 1.5 X quoted hourly rateTESTSLIMIT OF LIABILITYINSURANCEPAYMENT BASIS OF CHARGESFees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services other than supervisory will be charged at applicable rates. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Fenagh reserves the right to adjust the rates quoted in this contract based upon any CPI/state mandated increases and/or changes in any industry requirements.Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests maybe tested by sub consultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% mark-up.Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorneys fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid.The total liability of Fenagh, LLC is limited to the contract dollar value. For the waiver of subrogation if required by client, a 3% Fenagh administrative fee will be added to all gross billings/revenue in addition to the 3% Project Management fee.
All fees subject to Basis of Charges
EXHIBIT B
COST PROPOSAL FORM
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com Standard DiscountedCONCRETE National Standard Rate/Each Rate/EachCompressive Strength of Cylindrical Concrete Specimens (6x12) ASTM C39$55.00Compressive Strength of Cylindrical Concrete Specimens (4x8) ASTM C39$55.00$20.00Compressive Strength of Cylindrical Concrete Specimens (over 3500 psi)ASTM C39$85.00Compressive Strength of Cylindrical Concrete Specimens (over 6000 psi)ASTM C39$115.00Cylinder molds. 6 x 12 and 4" x 8" (Per Case)ASTM C470 $60.00Compressive Strength of Lightweight Insulating Concrete ASTM C495$65.00Obtaining and Testing Sawed Beams and Drilled Cores of Concrete (cores) ASTM C42$150.00Flexural Toughness of Fiber Reinforced Concrete (Round Panel) ASTM C1550$300.00Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) ASTM C78$210.00Length Change of Hardened Hydraulic-Cement Mortar and Concrete (Shrinkage 1 Sample) ASTM C157$100.00Shotcrete Nozzleman Qualification ACI 506, ASTM C42 and C1140$300.00Shotcrete Pre-Qualification Cores ACI 506, ASTM C42 and C1140$75.00Shotcrete Production Cores ASTM C1140$75.00Coefficient of Thermal Expansion AASHTO T336$360.00Determining Density of Structural Lightweight Concrete (Cylinders) ASTM C567$325.00Standard Specification for Concrete Made by Volumetric Batching and Mixing ASTM C685$775.00Cement Quality Sampling$585.00Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete ASTM C472$50.00Splitting Tensile Strength of Cylindrical Concrete Specimens ASTM C496$250.00Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression ASTM C469$260.00Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room$200.00Density of Hydraulic Cement ASTM C188$260.00Testing of Controlled Low Strength Material (CLSM) Test Cylinders ASTM D4832$200.00GFRC Pull Test PCI$500.00GFRC Flexural Test PCI$500.00Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell-Crete) ASTM C796$60.00Petrographic Analysis $3,500.00MASONRYCompressive Testing of Grout (Masonry)ASTM C1019$85.00Compressive Strength of Hydraulic Cement Mortars Using 2" Cube SpecimensASTM C109$125.00Compressive Strength of Masonry PrismsASTM C1314$125.00Testing Concrete Masonry Units and Related Units (Core Compression) CBC 2105A.4$175.00Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample)ASTM C780 A7.6$150.00Testing Concrete Masonry Units (CMU) and Related Units (Full Unit)ASTM C140$250.00Linear Drying Shrinkage of Concrete Masonry Units (Per Unit)ASTM C426$250.00Masonry Core Shear Testing$250.00Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight)ASTM C140$400.00Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)* ASTM C67$1,000.00Mortar Molds. 2 x 4. Single Use$125.00Mortar or Grout, Stored and Cured, Not Tested (including mold) $125.00AGGREGATES (SOILS AND CONCRETE)Determining Sieve Analysis of Fine and Coarse Aggregates (Coarse Only)ASTM C136$150.00Sieve Analysis of Fine and Coarse Aggregates (Fine Only)ASTM C136$200.00$140.00Sieve Analysis of Fine and Coarse Aggregates (Wash Included)ASTM C117$250.00$175.00Sieve Analysis of Fine and Coarse Aggregates (200 Wash Only) ASTM C117 $200.00$175.00Evaluating Cleanness of Coarse Aggregate$250.00Soundness of Aggregates by Use of Sodium Sulfate or Magnesium SulfateASTM C88$175.00Unit Weight of Aggregate$125.00Clay Lumps and Friable Particles in AggregatesASTM C142$150.00Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse AggregateASTM D4791$250.00Organic Impurities in Fine Aggregates for ConcreteASTM C40$225.00Density, Relative Density(Specific Gravity), and Absorption of Coarse AggregateASTM C127$225.00Density, Relative Density(Specific Gravity), and Absorption of Fine AggregateASTM C128$225.00Resistance of Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C131$500.00Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate ASTM D5821$250.00Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) ASTM C1252/AASHTO T304A$250.00Sand Equivalent Value of Soils and Fine AggregateASTM D2419$175.00$100.00Flakiness Index of Coarse Aggregate $175.00Durability Index (Fine)ASTM D3744$275.00Durability Index (Coarse)ASTM D3744$275.00Durability Index (Fine and Coarse)ASTM D 3744$285.00Lightweight Particles in AggregateASTM C123/AASHTO T113QORResistance of Rock to Wetting and Drying CRD-C169 $400.00*Unusual sample preparation for brick specimen will be charged at the established hourly rate.
LAB CONCRETE AND MASONRY TESTS
All fees subject to Basis of Charges
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard DiscountedSOILS National Code Rate/Each Rate/EachDirect Shear Test of Soils Under Consolidated Drained ConditionsASTM D3080$425.00Caltrans Corrosivity Package$425.00Resistivity and pH Measurements of Soil and Water $200.00Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water $200.00Soils and Waters for Sulfate Content $150.00Soils and Waters for Chloride Content $150.00Swell Test Under 60psf Surcharge (per SNV Amendments to IBC) ASTM D2435 (Modified) $175.00Particle-Size Analysis of Soils (with Hydrometer)ASTM D422$550.00Pore Water Extraction and Determination of the Soluble Salt Content of Soils by RefractometerASTM D4542$550.00Standard Test Method for Particle-Size Analysis of Soils (without Hydrometer)ASTM D422$450.00Liquid Limit, Plastic Limit, and Plasticity Index of SoilsASTM D4318$400.00Laboratory Compaction Characteristics of Soil Using Modified/Standard EffortASTM D1557/D698$400.00$140.00Field Density Test for Compaction$200.00Hydrometer Only ASTM D422$450.00pH of SoilsASTM D4972$450.00Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer ASTM D2844$600.00$225.00Laboratory Determination of Water(*moisture) Content of Soil and Rock by MassASTM D2216$200.00Density of Soil in Place by the Drive-Cylinder MethodASTM D2937$125.00Expansion Index of SoilsASTM D4829$375.00Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability)ASTM D5084$450.00Lab Compaction Characteristics of Soil 1 Point Proctor (Check Point)ASTM D698/D1557$225.00$140.00Maximum Index Density and Unit Weight of Soils Using a Vibratory TableASTM D4253$300.00Minimum Index Density and Unit Weight of Soils and Calculation of Relative DensityASTM D4254$300.00Density of Hydraulic Cement ASTM C188$275.00 Volatile Organic Content EPA 8260BQORSemi Volatile Organics by GC/Ms (Basic Target List) EPA 8270CQORTotal Organic CarbonASTM 2974/EPA 5310BmQORICP Metals Concentration EPA 6020 - CAM/CCR 17QORTotal Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SSEPA 8015BQORICP Metals Concentration EPA 6020QORpH EPA 9045D$450.00 Sequential Batch Extraction of Waste with Acidic Extraction FluidASTM D5284QORChromium Soluble EPA 7196AQORMoisture, Ash and Organic Matter of Peat and Other Organic Soils (Organic Content)ASTM D2974$250.00Universal Soil Classification System (USCS) Test ASTM D2487$400.00California Bearing Ratio Test ASTM D1883$400.00Unconfined Compressive Strength of Cohesive SoilASTM D2166$250.00ASPHALT National CodeBituminous Material Content of Asphalitic Concrete Mixtures By The Nuclear Method$900.00Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172$750.00$375.00Determining Low Temperature Performance Grade (PG) of Asphalt Binders ASTM 6816QORThickness/Height of Compacted Bituminous Paving Mixture Specimens (Cores) ASTM D3549$250.00Bituminous Mixtures Utilizing Four Inch Marshall Apparatus $325.00Method of Prep of Bituminous Mixture Test Specimens ASTM D6926$250.00Bulk Specific Gravity and Density of Compacted Bituminous Mixtures (LTMD) ASTM D1188 and D2726$900.00Indirect Tensile (IDT) Strength of Bituminous Mixtures (TSR) ASTM D6931QORMechanical Size Analysis (Coarse and Fine) of Extracted Aggregate ASTM D5444$350.00Marshall Stability and Flow of Bituminous Mixtures ASTM D6927$900.00$175.00Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041$350.00$140.00Swell of Bituminous Mixtures$350.00Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in AsphaltASTM D1461 $850.00Preperation of HMA Superpave Gyratory Compaction AASHTO T312$900.00Determination of Voids in Compacted Bituminous Mixtures $450.00Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method ASTM D6307$400.00Determination of Asphalt Binder Content of Asphaltic Concrete Mixtures (RAP) by the Ignition Method$400.00Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method ASTM D6307$400.00Determination of Asphalt and Moisture Contents of Bituminous Mixtures by Microwave Oven$400.00Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6)ASTM D1075$2,000.00Compressive Strength of Bituminous Mixtures ASTM D1074$250.00* Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established rates for laboratory technician.** Does not include sample preparation or sieve analysis
LAB SOILS AND ASPHALT TESTS
All fees subject to Basis of Charges
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard DiscountedMETALS MATERIALS MECHANICAL TESTS National Code Rate/Each Rate/EachMechanical Testing of Steel Products (General Tensile)ASTM A370$325.00Fillet Weld Break Test for Qualification (Welding)AWS B4.0$125.00Tension Testing of Metallic Materials (Welding Coupon Tensile)ASTM E8, B557 and AWS B4.0$325.00Mechanical Testing of Steel Products (Couplers)ASTM A370$325.00Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic Materials ASTM E2248 and ASTM E23QORTesting, Practices, and Terminology for Chemical Analysis of Steel ProductsASTM A751$300.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #3-#8ASTM A370 and E290$250.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #9-#11ASTM A370 and E290$300.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #14+ASTM A370 and E290QORMechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete Reinforcement ASTM A370, A82 and A185$300.00Guided Bend Test for Ductility of Welds, Mechanical Testing of WeldsASTM E190 and AWS B4.0$175.00Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor Bolts Only (Tension and Yield) ASTM F307, F1554 and F606$350.00Rockwell Hardness of Metallic Materials ASTM E18$100.00Proof Test for Carbon and Alloy Steel (Nuts Only)ASTM A194 or A563$225.00Radiographic Examination of Metallic Castings/WeldmentsASTM E94, E1030 and E1032QORMacroetching Metals and AlloysASTM E340, E381 and AWS$225.00Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (HSB Assemblies) ASTM F606$250.00Mechanical Testing of Steel Products (Terminators Tensile)ASTM A370 $250.00Steel Strand, Uncoated Seven-Wire for Prestressed Concrete ASTM A416 and A1061$1,000.00OTHER MATERIALS MECHANICAL TESTSStrength for Sewn or Bonded Seams of GeotextilesASTM D4884 $400.00Tearing Strength of Fabrics by the Tongue (Single Rip) ProcedureASTM D2261 $400.00Breaking Strength and Elongation of Textile Fabrics (Grab Test)ASTM D5034 $350.00Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars (FRP) ASTM D3039 $800.00Moisture Content of Non-Typical Materials ASTM C566$250.00Aluminum Oxide Content ASTM C25$750.00Viscosity of Non-Typical Materials ASTM D2196$450.00Plastic Ultimate Tensile ASTM D638$350.00FIREPROOFINGThickness and Density of Sprayed Fire-Resistive Material (SFRM)ASTM E605$250.00Cohesion/Adhesion of Sprayed Fire-Resistive Materials (Test Kit Only)ASTM E736$100.00CONTACT INFORMATIONArizona: 1746 E. Madison Street, Suite 5 Phoenix, AZ 85034 P 480.867.6877Nevada: 3842 E. Post Road, Suite B Las Vegas, NV 89120 P 702.449.2132New England: 12 Tech Cir Natick, MA 01760 P 617.938.3774New York: 54-21 73rd Place Maspeth, NY 11378 P 516.423.3482Northern California: 3942 Valley Avenue, Suite A Pleasanton, CA 94566 P 925.403.4747Southern California: 9070 Center Avenue Rancho Cucamonga, CA 91730 P 909.587.6374Texas: 3709 Promontory Point Drive, Suite 210 Austin, TX 78744 P 925.403.4747
LAB METALS AND OTHER MATERIALS TESTS
All fees subject to Basis of Charges
EXHIBIT B
Item Number: 20
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Agreement with Fenagh Engineering & Testing for Material Testing - Old Town Sidewalk Connectivity Project & Tawney Ridge Traffic Signal Project Recommendation:
That the Honorable City Council approve a Consultant / Professional Services Provider Agreement with Fenagh Engineering & Testing in an amount not to exceed $49,992.00 for construction material testing for the Old Town Sidewalk Connectivity Project and the Tawney Ridge Traffic Signal Project.
Fiscal Impact:
This action will result in a fiscal impact of $49,992.00. An additional appropriation is not required. Funds for these services are budgeted in Measure I, Fund 250, for the Old Town Sidewalk Connectivity Project (Project No. 62063) and the Tawney Ridge Traffic Signal Project (Project No. 60134). The material testing services will be billed on a time and material basis. The account numbers and available budget are shown in the table below.
Account Number Available Budget
2504500-55330-62063 $35,087.42
2504500-55315-60134 $18,965.92
Total $54,053.34
Strategic Plan Goal:
This project aligns with Goal E, Strategy 1 in the City of Victorville Strategic Plan 2020- 2023, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.”
Background:
The City Council has previously awarded construction contracts for the following projects:
2 9
3 6
•The Village Drive and Tawney Ridge Lane Traffic Signal Contract was awarded to Elecnor Belco Electric, Inc. on October 18, 2022.
•The Old Town Sidewalk Connectivity Phase I Contract was awarded to LCR Earthwork & Engineering Corp. on December 6, 2022.
Capital improvement projects require quality assurance materials testing to ensure materials incorporated into the work satisfy the contract specification and special provisions. This process helps ensure the materials provided by the contractor and the quality of the work performed will meet the life expectancy of the improvements. Both capital improvement projects will require soil inspection and material testing by a qualified geotechnical consultant. The consultant’s certified inspectors will report on testing of soils, crushed rock bases, asphalt, concrete, and construction activities to determine if the materials provided and installed meet the requirements of the contract specifications.
Discussion:
On December 1, 2022, a Request for Qualification (RFQ) for a Geotechnical Material Consultant for the Old Town Sidewalk Connectivity Phase I & Tawney Ridge Lane Traffic Signal Projects was issued. The RFQ was issued using procedures in accordance with Municipal Code §2.28.280. On December 16, 2022, eight responses from geotechnical consultants were received.
Each proposal was reviewed by Engineering Department staff to determine which geotechnical consultant best met the needs of the projects and City for the services requested. Based on qualifications, staff resources, and the unit rates included in the fee schedules, staff determined that Fenagh Engineering & Testing was the best fit consultant for this project.
This agreement is being presented to Council for approval because the City has other contracts with Fenagh Engineering which cumulatively exceed the City Manager’s purchasing authority of $125,000.00 per the City’s Municipal Code §2.28.060 (e)(3)(a).
Staff recommends that the City Council approve a Consultant / Professional Services Provider Agreement with Fenagh Engineering & Testing in an amount not to exceed $49,992.00 for Geotechnical Materials Consultant for the Guardrail Project.
Staff remains available to answer any questions the Council may have.
Attachments: A. Agreement
ATTACHMENT A
1 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENTBY AND BETWEEN THE CITY OF VICTORVILLE AND FENAGH ENGINEERING & TESTING FOR GEOTECHNICAL MATERIAL CONSULTANT FOR THE OLD TOWN SIDEWALK CONNECTIVITY PHASE I & TAWNEY RIDGE LANE TRAFFIC SIGNAL, PROJECT CC23-074 THIS CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENT (hereinafter “Agreement”), is made and entered into by and between THE CITY OF VICTORVILLE, a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as the “City”, and Fenagh Engineering & Testing, an LLC, hereinafter referred to as “Consultant.” City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties.” RECITALS: WHEREAS, the City requires a Geotechnical Material Consultant for the Old Town Sidewalk Connectivity Phase I & Tawney Ridge Lane Traffic Signal Project; and WHEREAS, Consultant represents that it is fully qualified to perform the consulting and/or professional services required for performance under this Agreement by virtue of its experience and the training, education and expertise of its principals and its employees; and WHEREAS, in light of the facts set forth above, the City desires to retain the services of a qualified Consultant to provide, on an independent contractor basis, Geotechnical Material Consultant for the Old Town Sidewalk Connectivity Phase I & Tawney Ridge Lane Traffic Signal Project; and NOW THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES HERETO AGREE AS FOLLOWS: Section 1. RECITALS The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth fully herein. Section 2. SCOPE OF SERVICES Consultant shall provide to the City those services set forth in the Scope of Services, attached hereto as Exhibit “A” and incorporated as part of this Agreement by this reference. 2 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 The City shall pay to Consultant a sum not to exceed Forty-nine Thousand Nine Hundred Ninety-two and 00/100 Dollars ($49,992.00) for faithful performance of the services to be rendered under this Agreement, subject to the Proposal provisions of Section 4, below. No expense reimbursements, including, but not limited to, reimbursements for travel, parking, lodging, and/or meals shall be paid to Consultant unless such expense reimbursements: (i) are specifically provided for and described by nature and type in Exhibit “B”, below; (ii) appear on Consultant’s monthly invoices to City; (iii) are supported by the appropriate receipts and other such documentation as the City shall require; and (iv) are directly related to the Scope of Services to be performed under this Agreement. In addition, any and all reimbursements shall be made in accordance with any City policy governing same. Section 4. COST PROPOSAL The City shall pay Consultant as provided in the Cost Proposal, attached hereto as Exhibit “B” and incorporated as part of this Agreement by this reference, subject to the provisions of Section 5. The provisions of Exhibit “B” notwithstanding, in order to receive payments, Consultant shall be required to submit to the City detailed monthly invoices which include, if applicable, a description of all services/tasks performed, the number of hours expended on each service/task, the name of the person performing the service/task, and expense reimbursement information, if any, as required by Section 3, above. Provided that services have been satisfactorily rendered, invoices shall be paid by the City approximately thirty (30) working days following receipt of Consultant’s invoice. Section 5. STATE PREVAILING WAGE AND RELATED LABOR PROVISIONS a. Compliance with State Prevailing Wage Law. Pursuant to California Labor Code Section 1773, the City has obtained from the Director of the Department of Industrial Relations (“DIR”) the general prevailing rate of per diem wages and the general prevailing wage rate for holiday and overtime work applicable for each craft, classification, or type of worker in San Bernardino County, California, where the Project is to be performed. Copies of these prevailing rate of per diem wages are on file at the City of Victorville Finance Department/Purchasing Division and shall be made available for review to any interested party on request. Copies of these prevailing rate of per diem wages are also available from the State of California via the internet at http://www.dir.ca.gov/DLSR/PWD. Consultant and its subconsultants/subcontractors shall pay not less than said specified prevailing rate of per diem wages to all workers employed by them in the performance of any work under this Agreement which constitutes “public works” or “public work”, including without limitation, the Geotechnical Material Consultant for the Old Town Sidewalk Connectivity Phase I & Tawney Ridge Lane Traffic Signal Project , and any other work or services described in or encompassed by California Labor Code (“Labor Code”) Sections 1720 through 1720.9, 1771, and 1772. Consultant shall be solely responsible for using the correct and current prevailing wage rates and performing accordingly. An error on the part of any awarding body does not relieve the Consultant from the responsibility for payment of the correct prevailing wage, or compliance with the maintenance and inspection of payroll records, posting of prevailing wage rates at the work/job site, employment of apprentices, and other requirements of Labor Code Section 1720 et seq.; Labor Code Section 1810 et seq.; California Code of Regulations, Title 8, Section 16000 et seq.; and all other applicable State labor laws. b. Designation as Consultant Not Determinative. For purposes of this Agreement, Consultant its subconsultants or subcontractors shall be subject to and shall comply with all provisions of the Labor Code applicable to contractors and subcontractors when they are 3 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 engaged in the performance of any work under this Agreement which constitutes “public works” or “public work” as defined in subsection a above, despite being designated as a Consultant or subconsultant herein. c. Conflict. It is further expressly agreed by and between the Parties hereto that should there be any conflict between the provisions of this Section 5 and the terms of Exhibit “A” or Exhibit “B” of this Agreement, the provisions of this Section 5 shall control, and nothing herein shall be considered as an acceptance of the terms of Consultant’s Scope of Services, Scope of Work, or Cost/Bid Proposal which conflict with the provisions of this Section 5. d. Payroll Records. Consultant and its subconsultants/subcontractors must comply with the provisions of Labor Code sections 1776 and 1812 and all implementing regulations, including without limitation, those set forth in Title 8 of the California Code of Regulations, Section 16000 et seq. (hereinafter the “Regulations”), which are fully incorporated by this reference, including requirements for electronic submission of payroll records to the DIR. (1) Consultant and Subconsultant/Subcontractor Obligations. Consultant and each subconsultant or subcontractor must keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the Work. Each payroll record must contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: (a) The information contained in the payroll record is true and correct; and (b) Consultant and or subconsultant/subcontractor has complied with the requirements of Labor Code Sections 1771, 1811, and 1815 for any covered work performed by its employees on the Project. (2) Certified Record. A certified copy of an employee’s payroll record must be made available for inspection or furnished to the employee or his or her authorized representative on request, to the City, to the Division of Labor Standards Enforcement, to the Division of Apprenticeship Standards of the DIR, and as further required by the Labor Code. (3) Enforcement. Upon notice of noncompliance with Labor Code Section 1776, Consultant and/or subconsultant/subcontractor has ten days in which to comply with the requirements of this section. If Consultant and/or subconsultant/subcontractor fails to do so within the ten-day period, Consultant and/or subconsultant/subcontractor will forfeit a penalty of $100.00 per day, or portion a day, for each worker for whom compliance is required, until strict compliance is achieved. Upon request by the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement, these penalties will be withheld from payments then due to Consultant and/or subconsultant/subcontractor. (4) Payment of Invoices. Copies of the certified payrolls, proof of payroll submissions, and appropriate lien releases are required with each invoice to the City. Payment of the invoice may be delayed when payroll-related documents and/or lien releases are not included with the invoice. 4 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 e. Apprentices. Consultant is responsible for compliance with the requirements governing employment and payment of apprentices, as set forth in Labor Code section 1777.5, which is fully incorporated by reference. f. Notices. Pursuant to Labor Code section 1771.4, Consultant is required to post all Job Site notices, including prevailing wage rates and other notices, as required by regulation. g. Other Labor Requirements. Consultant has the responsibility for and shall comply with all other applicable requirements of Labor Code Section 1720 et seq., Labor Code Section 1810 et seq., the Regulations, and all other applicable State labor laws. Consultant further acknowledges and agrees that it will be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with those laws. Consultant shall require the same of all its subconsultants or subcontractors. h. Statutory Penalties. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hours laws will be enforced as follows: (1) Pursuant to Labor Code section 1775, the Consultant and any subcontractor/subconsultant under it shall forfeit as a penalty to the City not more than Two Hundred Dollars ($200.00), for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate as determined by the Director of the DIR for such work or craft in which such worker is employed for any public work done under this Agreement by it or by any subcontractor/subconsultant under it. The difference between such prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker by the Consultant and/or subconsultant/subcontractor as provided for in Section 1775. (2) Pursuant to Labor Code Section 1813, Consultant and its subconsultants or subcontractors shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the respective Consultant or subconsultant/subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week, except as specified in Labor Code Section 1815. In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. i. DIR Monitoring. Pursuant to Labor Code Section 1771.4, this Agreement is subject to compliance monitoring and enforcement by the DIR. j. DIR Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and its subconsultants/subcontractors must be registered with the DIR prior to the execution of a contract to perform public works. By entering into this Agreement, Consultant represents that it is aware of the registration requirement and is currently registered with the DIR. Consultant shall maintain a current registration for the duration of the Agreement. Consultant shall further include the requirements of Labor Code Sections 1725.5 and 1771.1 in any subcontract and ensure that all subconsultants/subcontractors are registered at the time this Agreement is entered into and maintain registration for the duration thereof. 5 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Section 6. TERM OF AGREEMENTThis Agreement shall be for an Initial Term of commencing on the date of full execution of the Agreement (the “Commencement Date”) and expiring on December 31, 2023 (the “Termination Date”) (the “Term”), unless terminated earlier pursuant to Section 21 of this Agreement. From and after the Termination Date, and upon subsequent Agreement by the Parties, this Agreement may continue on a month-to-month basis until terminated pursuant to Section 21 below. Section 7. INDEPENDENT CONTRACTOR STATUSIt is the express intention of the Parties that Consultant is an independent contractor and not an employee, agent, joint venture, or partner of the City. Nothing in this Agreement shall be interpreted or construed as creating or establishing the relationship of employer and employee between the City and Consultant or any employee or agent of Consultant. Both Parties acknowledge that Consultant is not an employee for state or federal tax purposes or any other purpose. Consultant shall retain the right to perform services for others during the term of this Agreement. Section 8. REPRESENTATIONS AND ACKNOWLEDGMENTS REGARDING INDEPENDENT CONTRACTOR’S STATUS OF CONSULTANT a. Consultant represents and acknowledges the following: (1) The City is not required to provide any training or legal counsel to Consultant or its employees in order for Consultant to perform the services described in this Agreement. (2) Performance of the services described in this Agreement does not have to be integrated into the daily business operations of the City. (3) The services described in this Agreement can be performed without the use of City equipment, materials, tools, or facilities, unless otherwise provided under a separate Agreement. (4) Nothing in this Agreement shall be interpreted to imply that the City must maintain any contractual relationship with Consultant on a continuing basis after termination of this Agreement. (5) The City will not be requested or demanded to assume any liability for the direct payment of any salary, wage, or other such compensation to any person employed by Consultant to perform the services described in this Agreement. (6) Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are employees of the City. b. The City represents and acknowledges the following: (1) Consultant is solely responsible for determining who, under the supervision or direction of Consultant, will perform the services set forth in this Agreement. 6 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 (2) The City will not hire, supervise, or pay any employees or assistants working for Consultant pursuant to this Agreement. Nothing contained in this Agreement shall prevent the City from hiring Consultant’s employees or assistants after termination of this Agreement. (3) Nothing in this Agreement shall be interpreted to imply that Consultant must maintain any contractual relationship with the City on a continuing basis after termination of this Agreement. (4) It is the sole responsibility of Consultant to set the hours in which Consultant performs or plans to perform the services set forth in this Agreement. (5) Consultant is not required to devote full time to the business operations of the City in order to perform the services set forth in this Agreement. (6) Unless deemed necessary under certain circumstances, Consultant is not required to perform the services set forth in this Agreement at City Hall or on City-owned property. (7) Other than attendance at required public meetings and public hearings, and complying with the provisions of the Proposal set forth in Exhibit B and any procedural requirements set forth by law, Consultant is not required to perform the services set forth in this Agreement in any particular order or sequence. (8) Nothing in this Agreement shall be interpreted to preclude Consultant from working for other persons or firms, provided that such work does not create a conflict of interest. Section 9. NOT AGENT OF THE CITY a. Nothing contained in this Agreement shall be deemed, construed, or represented by the City or Consultant or by any third person to create the relationship of principal and agent. b. Consultant shall have no authority, express or implied, to act on behalf of the City in any capacity whatsoever as an agent, nor shall Consultant have any authority, express or implied, to bind the City to any obligation whatsoever. Section 10. LICENSES AND PERMITS Consultant represents that it has obtained and will maintain at all times during the Initial Term (and during the Option Period, if applicable) of this Agreement all business licenses, including but not limited to a City of Victorville business license, professional licenses or certifications, or permits necessary for performing the services described in this Agreement. Section 11. STANDARD OF PERFORMANCE; WARRANTY a. Consultant agrees to perform all services required by this Agreement in a professional and competent manner, in accordance with the degree of skill and diligence which is normally employed by reputable professionals performing similar services under similar conditions in the same or similar locality. Such services shall also be performed in a manner which is reasonably satisfactory to Brian Gengler, City Engineer, or his designee. b. By executing this Agreement, Consultant warrants that it:
7 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 (1) Has thoroughly investigated and considered the services and work to be performed; (2) Has investigated the issues regarding the scope of services to be provided; (3) Has carefully considered how the services and related work should be performed; and (4) Fully understands the facilities, difficulties and restrictions associated with performance of the services required by this Agreement. Section 12. FAMILIARITY WITH WORK Should Consultant discover any latent or unknown conditions materially differing from those inherent in the services or as represented by the City, Consultant shall immediately inform the City of such fact and shall not provide any services, except at Consultant's risk, until written instructions are received from Brian Gengler, City Engineer, or his designee. Section 13. CONFLICTS OF INTEREST Consultant covenants that it does not have any interest, nor shall it acquire any interest, directly or indirectly, which would conflict in any manner with the performance of Consultant’s services under this Agreement. Consultant further covenants that in the performance of services under this Agreement, no officer, employee or agent of Consultant having such interest shall be employed by it. In the event the City determines that Consultant must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests, Consultant shall file such Form 700 with the City Clerk’s Office pursuant to the written instructions provided by the City Clerk. Acquisition or maintenance of a conflicting interest by Consultant may result in termination of this Agreement by the City. Section 14. COMPLIANCE WITH LAWS Consultant shall comply with all local, state, and federal laws and regulations applicable to the services to be rendered hereunder, including any rule, regulation, or bylaw governing the conduct or performance of Consultant or its employees, officers, or board members. Section 15. COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY INSURANCE a. Consultant shall procure and maintain at its own expense, during the Initial Term of this Agreement (and during the Option Period, if applicable), Commercial General Liability Insurance, of not less than One Million Dollars ($1,000,000) per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by Consultant or its officers, employees, servants, volunteers, and agents and independent contractors. b. Consultant shall further procure and maintain, at its own expense, during the Initial Term of this Agreement, (and during the Option Period, if applicable), Commercial Vehicle 8 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Liability Insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) combined single limit, covering any vehicle utilized by Consultant or its officers, employees, servants, volunteers, agents and independent contractors in performing the services required by this Agreement. Section 16. WORKERS' COMPENSATION INSURANCE a. Consultant shall procure and maintain at its own expense, during the Initial Term of this Agreement (and during the Option Period, if applicable), Workers' Compensation Insurance, providing coverage as required by the California State Workers' Compensation Law. b. If any class of employees employed by the Consultant pursuant to this Agreement is not protected by the California State Workers' Compensation Law, Consultant shall provide adequate insurance for the protection of such employees to the satisfaction of the City. Section 17. PROFESSIONAL LIABILITY INSURANCE a. Professional Liability Insurance or Errors and Omissions insurance as appropriate to Consultant’s profession shall be required and written on a policy form specifically designed to provide coverage for and protect against the negligent acts, errors and omissions of the Consultant in the performance of the services required by this Agreement. A minimum limit of $1,000,000 per claim and in the aggregate must be provided. Section 18. ADDITIONAL INSURED Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, all insurance policies, except for the Workers' Compensation and Professional Liability, shall be endorsed to name the City and its officers, employees, servants, volunteers, agents and independent contractors, including, without limitation, the City Attorney, as Additional Insureds. Section 19. WAIVER OF SUBROGATION RIGHTS Consultant shall require the carriers of all required insurance policies, with exception to Professional Liability, to waive all rights of subrogation against the City and its officers, employees, servants, volunteers, agents, and independent contractors and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver. Section 20. PROOF OF INSURANCE COVERAGE; REQUIRED ENDORSEMENTS a. Consultant shall secure from a good and responsible company or companies authorized to transact insurance business in the State of California, the policies of insurance required by this Agreement and furnish to the City Clerk certificates of insurance evidencing the required coverage, and policy endorsements at least one (1) business day prior to the commencement of any services to be performed under this Agreement. b. The policies and certificates of insurance shall be endorsed to provide that in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days 9 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 before the cancellation or amendment is effective. In the case of cancellation for non-payment, ten (10) days advance written notice shall be given. c. Each policy and certificate of insurance shall be endorsed to provide that the policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration. d. Each policy and certificate of insurance shall be endorsed to provide that the policy will be maintained throughout the Initial Term (and during the Option Period, if applicable), of this Agreement. e. The Commercial General Liability and Vehicle Liability policies shall be endorsed to contain the following provision: “For any claims related to this Agreement, Consultant’s coverage shall be primary with respect to the City. Any insurance maintained by the City shall be in excess of Consultant’s insurance and shall not contribute with it.” Section 21. TERMINATION OR SUSPENSION a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination. b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination. Section 22. TIME OF THE ESSENCE Time is of the essence in the performance of this Agreement. Section 23. INDEMNIFICATION a. Except as set forth in Subsection b of this Section 23, and to the fullest extent permitted by law, Consultant shall immediately defend, indemnify, and hold harmless the City, its officers, employees, representatives, and agents (the “City Indemnitees”), from and against those actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and reasonable attorneys’ fees, for any personal injuries, deaths, or property damage, including property owned by the City (collectively “Claims”) which may arise out of Consultant's negligence or willful misconduct in the performance of the services described in this Agreement, unless such Claims are proven to be caused by the negligence or willful misconduct of the City Indemnitees. b. The provisions of this Subsection b apply only in the event that Consultant is a design professional within the meaning of California Civil Code section 2782.8 (“Design Professional”). The term Design Professional, as defined in said section, is limited to licensed 10 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 architects, licensed landscape architects, registered professional engineers, professional land surveyors, and the business entities that offer such services in accordance with the applicable provisions of the California Business and Professions Code. (1) Notwithstanding the provisions of Subsection a above, to the extent that the services to be provided under this Agreement are those of a Design Professional, Consultant's duty to indemnify, hold harmless, and defend the City Indemnitees shall be limited to the extent that any Claims arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, its officers, agents, employees or subconsultants in the performance of the services described in this Agreement. (2) In no event shall the costs of defense charged to Consultant exceed the Consultant’s proportionate percentage of fault, except as otherwise set forth in said Civil Code section 2782.8, the provisions of which are incorporated into this Agreement by this reference. Nothing in this Subsection b shall be construed to require Consultant to provide indemnification for Claims caused by the active negligence or willful misconduct of the City Indemnitees. c. The City does not and shall not waive any rights that it may have against Consultant under this Section, because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions of this Section 23 shall apply regardless of whether said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost, or expense described herein. d. The obligation to indemnify and defend, as set forth in this Section 23, is binding on the successors, assigns, or heirs of Consultant and shall survive the expiration or any early termination of this Agreement. Section 24. REPORTS Upon request by Brian Gengler, City Engineer, or his designee or as otherwise required by this Agreement, including but not limited to, the Scope of Services set forth in Exhibit “A”, Consultant shall prepare and submit reports to the City concerning Consultant's performance of the services required by this Agreement. Section 25. RECORDS a. Consultant shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Brian Gengler, City Engineer, or his designee, to evaluate the cost and the performance of such services. b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles. c. Brian Gengler, City Engineer, or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records. d. Records and supporting documents pertaining to the use of funds paid to Consultant hereunder shall be retained by Consultant and made available to Brian Gengler, 11 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 City Engineer, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement. Section 26. RESERVED Section 27. CONFIDENTIALITY; OWNERSHIP OF WORK a. Any and all documents and information obtained from the City or prepared by Consultant for the City shall be kept strictly confidential unless otherwise provided by applicable law. All City data, documents and information shall be returned to the City upon termination of the Agreement. b. Any drawings, specifications, reports, records, documents, or other materials prepared by Consultant in the performance of services under this Agreement shall not be released publicly without the prior written approval of Brian Gengler, City Engineer, or his designee, or as required by applicable law. c. Consultant shall not disclose to any other entity or person any information regarding the activities of the City, except with the prior written approval of Brian Gengler, City Engineer, or his designee, or as required by applicable law. d. All original documents, reports, designs, computer files and all other materials prepared by Consultant in the course of performing the services pursuant to this Agreement, whether completed or in progress, are the property of the City and shall be surrendered to the City upon the completion of Consultant’s services or when requested by Brian Gengler, City Engineer, or his designee. Such materials may be used, reused or otherwise disposed of by the City without the permission of Consultant. e. Consultant’s covenants under this Section 27 shall survive the termination of this Agreement. Section 28. PRINCIPAL REPRESENTATIVES a. Martin B. Lowenthal, Regional Vice President, is designated as the principal representative of Consultant for purposes of communicating with the City on any matter associated with the performance of the services set forth in this Agreement. b. Brian Gengler, City Engineer, or his designee shall be the principal representative of the City for purposes of communicating with Consultant on any matter associated with the performance of the services set forth in this Agreement. c. Either Party may designate another individual as its principal representative by giving written notice of such designation to the other Party. Section 29. MODIFICATIONS AND AMENDMENTS; EXTRA SERVICES a. This Agreement may be modified or amended only by a written instrument signed by both Parties. b. During the Initial Term, the City may request that the Consultant perform Extra Services. As used herein, "Extra Services" means any services, which are determined by the 12 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 City to be necessary for the proper completion of Geotechnical Material Consultant for the Old Town Sidewalk Connectivity Phase I & Tawney Ridge Lane Traffic Signal Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. A written instrument signed by both Parties shall be required to authorize performance of and payment for Extra Services. Section 30. ENTIRE AGREEMENT a. This Agreement supersedes any and all prior or contemporaneous Agreements, either oral or written, between the City and Consultant with respect to the subject matter of this Agreement. b. This Agreement contains all of the covenants and Agreements between the Parties with respect to the subject matter of this Agreement, and each Party to this Agreement acknowledges that no representations, inducements, promises, or Agreements have been made by or on behalf of any Party, except those covenants and Agreements in this Agreement. c. No Agreement, statement, or promise with respect to the subject matter of this Agreement, which is not contained in this Agreement, or in a valid modification or amendment to this Agreement, shall be valid or binding on either Party. Section 31. AMBIGUITIES This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them. Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement. Notwithstanding the foregoing, the Parties agree that Exhibit “B” is attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this Consultant/Professional Services Standard Provider Agreement and Exhibit “B” the terms of this Consultant/Professional Services Standard Provider Agreement shall control and nothing set forth in Exhibit “B” shall be deemed to supersede any of the provisions of this Consultant/Professional Services Standard Provider Agreement. Section 32. NOTICES a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows: To the City: Brian Gengler, City Engineer City of Victorville 14343 Civic Drive Victorville, CA 92392 13 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 To Consultant: Martin B. Lowenthal, Regional Vice President, Fenagh Engineering & Testing 9070 Center Avenue Rancho Cucamonga, CA 91730 b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail. Section 33. NON-LIABILITY OF CITY OFFICERS AND EMPLOYEES No officer or employee of the City shall be personally liable to Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount, which may become due to Consultant or to its successor(s), or for any breach of any obligation of the terms of this Agreement. Section 34. REVIEW BY ATTORNEYS Each Party hereto has had its attorney(s) review this Agreement and all related documents. Each Party hereto has consulted with its attorney(s) and has negotiated the terms of this Agreement based on such consultation. Section 35. WAIVER a. No waiver shall be binding unless executed in writing by the Party making the waiver. b. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. c. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of such provision or any of the remaining provisions of this Agreement. Section 36. ASSIGNMENT This Agreement shall not be assigned by either Party without prior written consent of the other Party. Section 37. CARE OF WORK The performance of services by Consultant or the payment of money by the City shall not relieve Consultant from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such incomplete, inaccurate or defective work is due to the negligence of Consultant. 14 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 Section 38. CAPTIONS AND HEADINGSThe captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading. Section 39. SUCCESSORS, HEIRS, AND ASSIGNS Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties. Section 40. GENDER In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another. Section 41. SEVERABILITY If any one or more of the sentences, clauses, paragraphs, or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair, or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein. Section 42. GOVERNING LAW The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law. Section 43. DEFAULT a. Failure or delay by any Party to this Agreement to perform any material term or provision of this Agreement shall constitute a default under this Agreement; provided however, that if the Party who is otherwise claimed to be in default by the other Party commences to cure, correct, or remedy the alleged default within fifteen (15) days after receipt of written notice specifying such default and shall diligently complete such cure, correction, or remedy, such Party shall not be deemed to be in default hereunder. b. The Party claiming that a default has occurred shall give written notice of default to the Party in default, specifying the alleged default. Delay in giving such notice shall not constitute a waiver of any default nor shall it change the time of default; provided, however, the injured Party shall have no right to exercise any remedy for a default hereunder without delivering the written default notice, as specified herein. c. Any failure or delay by a Party in asserting any of its rights or remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default. 15 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 d. In the event that a default by any Party to this Agreement may remain uncured for more than fifteen (15) days following written notice, as provided above, the injured Party shall be entitled to seek any appropriate remedy or damages by initiating legal proceedings. Section 44. CUMULATIVE REMEDIESExcept with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party. Section 45. VENUE All proceedings involving disputes over the terms, provisions, covenants, or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California. Section 46. ATTORNEYS’ FEES In the event any action, suit, or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement, or as a result of any alleged breach of any provision of this Agreement, the prevailing Party in such suit or proceeding shall be entitled to recover its costs and expenses, including reasonable attorneys’ fees, from the losing Party, and any judgment or decree rendered in such a proceeding shall include an award thereof. Section 47. EFFECTIVENESS OF AGREEMENT This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Consultant, approved by the City’s Risk Manager, and executed by the authorized City personnel or Mayor. Section 48. REPRESENTATIONS OF PARTIES AND PERSONS EXECUTING AGREEMENT a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto. b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent. Section 49. COUNTERPARTS This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement. (END OF THIS PAGE) 16 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below. THE CITY OF VICTORVILLE FENAGH ENGINEERING & TESTING By:______________________________ By:_____________________________ Debra Jones, Michael B. Lowenthal, Mayor Vice President Dated: ___________________________ Dated:__________________________ ATTEST By:______________________________ Jennifer Thompson, City Clerk Dated:___________________________ THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM: By: _______________________________ By: ____________________________ Lee Brown, Andre de Bortnowsky, Risk Manager City Attorney Dated:______________________________ Dated:__________________________ 17 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 EXHIBIT A SCOPE OF SERVICES City agrees to engage Consultant and Consultant agrees to furnish all necessary labor, tools, materials, and equipment to perform the services as generally described in the Request Quote CC23-074 for the Project, portions of which are attached hereto for ease of reference as Exhibit "A", and the entirety of which is currently on file in office of the City Clerk; and (ii) the prices set forth in Consultant’s Bid Proposal (attached as Exhibit "B.
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
18/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
19/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
20/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
21/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
22/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074
CI T Y O F VI C T O RV I L L E, CA L I F O R N I A
Technical Provisions RFQ Geotechnical Material Consultant, Project CC23-074
EXHIBIT A
23/Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-074 Consultant/Professional Services Provider Agreement/Fenagh Engineering & Testing/Project CC23-073 EXHIBIT B COST PROPOSAL See Attachment
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com
COST PROPOSAL FORMCI T Y O F VI C T O R V I L L E, CAL I F O R N I A Section D Forms RFQ Geotechnical Material Consultant, Project CC23-074 20 Hours$175.0010 Hours$65.0032 Hours$65.0012 Hours$25.0016 Hours$65.00120 Hours$98.00140 Hours$98.0064 Hours$98.0015 Each$100.0012 Each$140.0012 Each$100.0012 Each$140.0012 Each$140.0060 Each$20.002 Each$175.002 Each$140.002 Each$375.002 Each$175.00$49,992.00Fenagh Engineering & TestingMartin B. Lowenthal Regional VP 12/14/2022 $3,500.00$650.00$2,080.00$300.00$1,040.00$11,760.00$13,720.00$6,272.00$1,500.00$1,680.00$1,200.00$1,680.00$1,680.00$1,200.00$350.00$280.00$750.00$350.00
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard Discounted* FIELD INSPECTION SERVICES National Code Rate/Hour Rate/HourSteel Visual Welding $150.00Steel Visual Bolting $150.00Nondestructive - UT, MT, PT $150.00Steel Visual/NDT Combination $150.00Concrete ACI Sampling $150.00$98.00Concrete ICC/ACI-II (Rebar/Placement) $150.00$98.00Concrete PT $150.00Masonry $150.00Fireproofing (Thickness/Density) $150.00Firestopping/Fire-safing $150.00Soil Technician w/Nuclear Gauge and/or Sand Cone $150.00$98.00Asphalt Technician w/Nuclear Gauge $150.00$98.00Roofing & Weatherproofing/Waterproofing $150.00Structural Wood Framing $150.00Shotcrete $150.00Fiber Reinforced Concrete (FRP) $150.00Multi-Disciplined Inspector $150.00Specialty Inspector where certification not above is required $150.00Quality Control Manager $155.00ASNT Level III $175.00Laboratory Technician/Sample Runner $150.00Project Coordinator $150.00Technician Typist $150.00**PROFESSIONAL SERVICESPrincipal Engineer (Civil/Structural) $325.00Geotechnical Engineer $245.00$175.00Consulting Engineer (Envelope) $295.00Associate Engineer, Licensed $225.00Project Geologist $225.00Project Manager $225.00$65.00Staff Engineer $225.00Field Inspection Manager $200.00$65.00Laboratory Manager $150.00$65.00SPECIAL SERVICESPortable and Mobile Laboratories, Concrete and Soils QOR*** Off-Site Structural Steel or Precast Fabrication $185.00* Epoxy Bolt Proof Load/Pull Testing $135.00* Expansion Anchor Proof Load/Torque Testing $135.00* Coring, 1 Person (including equipment) $325.00* Coring, 2 Persons (including equipment) $425.00Engineering Project Research QORGeotechnical Site Investigations/Foundation Reports $7,500.00Floor Flatness Testing FF/FL $295.00Floor Flatness Testing FF/FL - Report Fee $500.00Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $100/KitASTM F1869 $115.00Relative Humidity Testing - ($100/kit) ASTM F2170 $115.00GPR (Ground Penetrating Radar) $350.00Concrete Crack Gauge Monitoring $350.00Water Penetration of Windows, Skylights, Doors and Curtain Walls by Uniform or Cyclic Pressure ASTM E1105 $2,850.00Air and Water Infiltration Leakage Testing AMMA 501.2 $2,850.00Electronic Leak Detection of Roof (Vector Mapping) QORAir Content Test Equipment $100.00Slump & Temperature Equipment $100.00Fireproof Density and Adhesion/Cohesion Inspection Kit $100.00Administration, Accounting, Special Projects, Notary, Certified Payroll $125.00$25.00Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $350.00Welding Procedure Review (less than 48 hours notice - $500) $350.00Welder Qualification Test Record AWS $1,000.00Geotechnical Pad Letter (less than 48 hours notice - $2,000) $1,500.00Final Letter (less than 48 hours notice - $2,000) $1,500.00Expert Witness Court appearance, per day $2,400.00 FEE SCHEDULE - CITY OF VICTORVILLE RFQ CC23-074 12/16/2022PERSONNEL FEES AND BASIS OF CHARGESINSPECTIONS, ENGINEERING & SPECIAL SERVICES * Field inspection services will be billed in accordance with minimums shown on Basis of Charges. **Professional engineering services and laboratory technician services will be billed at actual time. *** All plant inspections are located within 50 miles of the project location. Steel shops will be AISC certified and concrete plants will be PIC certified. **** Two inspections performed by the same inspector during a site visit will be billed at the combination rate.***** Three or more inspections performed by the same inspector during a site visit will be billed at the multi-disciplined rate.All fees subject to Basis of Charges
EXHIBIT B
COST PROPOSAL FORM
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com GENERALMINIMUM HOURLY CHARGES INSPECTIONTechnician personnel and the following minimum charges are contractual commitment:Job Cancel/Show-up time 2 Hours Reinspection time 1.25 x quoted hourly rateWORKING HOURS AND PREMIUM TIMERegular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows:Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rateOvertime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rateOvertime Sundays (over 8 hours) and Holidays 3 x quoted hourly rateShift differential, swing and graveyard - (Work performed between 2:00 pm and 4:00 am) 1.5 x quoted hourly rateMISCELLANEOUS CHARGES - Only Where ApplicableNotary Services Fee $25.00/eachFacsimile Charges. Plus $1.00/page (n/c for cover page) $5.00 minimumWireless Router/Data Card for Jobsite Internet $100.00/dayParking Fees At CostAir Travel Cost Plus 5%Outside Services Cost Plus 20%Per Diem $125.00/dayMileage Standard Federal RateTrip Charge $200/daySample Pickup $40.00/Per Sample$100/Per TripWeekend Sample Pickup $75.00/hourProject Administration 7% of Monthly InvoiceSamples Made by Others $110 + Test CostLaboratory Sample Witness Fee $100.00EZ Cure Boxes (Thermostatically Controlled Curing Boxes) QORReturned Check Fee $100.00Expedited Dispatch Request (inspections scheduled less than 12 hours notice) 1.5 X quoted hourly rateTESTSLIMIT OF LIABILITYINSURANCEPAYMENT BASIS OF CHARGESFees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services other than supervisory will be charged at applicable rates. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Fenagh reserves the right to adjust the rates quoted in this contract based upon any CPI/state mandated increases and/or changes in any industry requirements.Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests maybe tested by sub consultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% mark-up.Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorneys fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid.The total liability of Fenagh, LLC is limited to the contract dollar value. For the waiver of subrogation if required by client, a 3% Fenagh administrative fee will be added to all gross billings/revenue in addition to the 3% Project Management fee.
All fees subject to Basis of Charges
EXHIBIT B
COST PROPOSAL FORM
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com Standard DiscountedCONCRETE National Standard Rate/Each Rate/EachCompressive Strength of Cylindrical Concrete Specimens (6x12) ASTM C39$55.00Compressive Strength of Cylindrical Concrete Specimens (4x8) ASTM C39$55.00$20.00Compressive Strength of Cylindrical Concrete Specimens (over 3500 psi)ASTM C39$85.00Compressive Strength of Cylindrical Concrete Specimens (over 6000 psi)ASTM C39$115.00Cylinder molds. 6 x 12 and 4" x 8" (Per Case)ASTM C470 $60.00Compressive Strength of Lightweight Insulating Concrete ASTM C495$65.00Obtaining and Testing Sawed Beams and Drilled Cores of Concrete (cores) ASTM C42$150.00Flexural Toughness of Fiber Reinforced Concrete (Round Panel) ASTM C1550$300.00Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) ASTM C78$210.00Length Change of Hardened Hydraulic-Cement Mortar and Concrete (Shrinkage 1 Sample) ASTM C157$100.00Shotcrete Nozzleman Qualification ACI 506, ASTM C42 and C1140$300.00Shotcrete Pre-Qualification Cores ACI 506, ASTM C42 and C1140$75.00Shotcrete Production Cores ASTM C1140$75.00Coefficient of Thermal Expansion AASHTO T336$360.00Determining Density of Structural Lightweight Concrete (Cylinders) ASTM C567$325.00Standard Specification for Concrete Made by Volumetric Batching and Mixing ASTM C685$775.00Cement Quality Sampling$585.00Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete ASTM C472$50.00Splitting Tensile Strength of Cylindrical Concrete Specimens ASTM C496$250.00Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression ASTM C469$260.00Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room$200.00Density of Hydraulic Cement ASTM C188$260.00Testing of Controlled Low Strength Material (CLSM) Test Cylinders ASTM D4832$200.00GFRC Pull Test PCI$500.00GFRC Flexural Test PCI$500.00Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell-Crete) ASTM C796$60.00Petrographic Analysis $3,500.00MASONRYCompressive Testing of Grout (Masonry)ASTM C1019$85.00Compressive Strength of Hydraulic Cement Mortars Using 2" Cube SpecimensASTM C109$125.00Compressive Strength of Masonry PrismsASTM C1314$125.00Testing Concrete Masonry Units and Related Units (Core Compression) CBC 2105A.4$175.00Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample)ASTM C780 A7.6$150.00Testing Concrete Masonry Units (CMU) and Related Units (Full Unit)ASTM C140$250.00Linear Drying Shrinkage of Concrete Masonry Units (Per Unit)ASTM C426$250.00Masonry Core Shear Testing$250.00Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight)ASTM C140$400.00Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)* ASTM C67$1,000.00Mortar Molds. 2 x 4. Single Use$125.00Mortar or Grout, Stored and Cured, Not Tested (including mold) $125.00AGGREGATES (SOILS AND CONCRETE)Determining Sieve Analysis of Fine and Coarse Aggregates (Coarse Only)ASTM C136$150.00Sieve Analysis of Fine and Coarse Aggregates (Fine Only)ASTM C136$200.00$140.00Sieve Analysis of Fine and Coarse Aggregates (Wash Included)ASTM C117$250.00$175.00Sieve Analysis of Fine and Coarse Aggregates (200 Wash Only) ASTM C117 $200.00$175.00Evaluating Cleanness of Coarse Aggregate$250.00Soundness of Aggregates by Use of Sodium Sulfate or Magnesium SulfateASTM C88$175.00Unit Weight of Aggregate$125.00Clay Lumps and Friable Particles in AggregatesASTM C142$150.00Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse AggregateASTM D4791$250.00Organic Impurities in Fine Aggregates for ConcreteASTM C40$225.00Density, Relative Density(Specific Gravity), and Absorption of Coarse AggregateASTM C127$225.00Density, Relative Density(Specific Gravity), and Absorption of Fine AggregateASTM C128$225.00Resistance of Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C131$500.00Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate ASTM D5821$250.00Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) ASTM C1252/AASHTO T304A$250.00Sand Equivalent Value of Soils and Fine AggregateASTM D2419$175.00$100.00Flakiness Index of Coarse Aggregate $175.00Durability Index (Fine)ASTM D3744$275.00Durability Index (Coarse)ASTM D3744$275.00Durability Index (Fine and Coarse)ASTM D 3744$285.00Lightweight Particles in AggregateASTM C123/AASHTO T113QORResistance of Rock to Wetting and Drying CRD-C169 $400.00*Unusual sample preparation for brick specimen will be charged at the established hourly rate.
LAB CONCRETE AND MASONRY TESTS
All fees subject to Basis of Charges
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard DiscountedSOILS National Code Rate/Each Rate/EachDirect Shear Test of Soils Under Consolidated Drained ConditionsASTM D3080$425.00Caltrans Corrosivity Package$425.00Resistivity and pH Measurements of Soil and Water $200.00Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water $200.00Soils and Waters for Sulfate Content $150.00Soils and Waters for Chloride Content $150.00Swell Test Under 60psf Surcharge (per SNV Amendments to IBC) ASTM D2435 (Modified) $175.00Particle-Size Analysis of Soils (with Hydrometer)ASTM D422$550.00Pore Water Extraction and Determination of the Soluble Salt Content of Soils by RefractometerASTM D4542$550.00Standard Test Method for Particle-Size Analysis of Soils (without Hydrometer)ASTM D422$450.00Liquid Limit, Plastic Limit, and Plasticity Index of SoilsASTM D4318$400.00Laboratory Compaction Characteristics of Soil Using Modified/Standard EffortASTM D1557/D698$400.00$140.00Field Density Test for Compaction$200.00Hydrometer Only ASTM D422$450.00pH of SoilsASTM D4972$450.00Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer ASTM D2844$600.00$225.00Laboratory Determination of Water(*moisture) Content of Soil and Rock by MassASTM D2216$200.00Density of Soil in Place by the Drive-Cylinder MethodASTM D2937$125.00Expansion Index of SoilsASTM D4829$375.00Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability)ASTM D5084$450.00Lab Compaction Characteristics of Soil 1 Point Proctor (Check Point)ASTM D698/D1557$225.00$140.00Maximum Index Density and Unit Weight of Soils Using a Vibratory TableASTM D4253$300.00Minimum Index Density and Unit Weight of Soils and Calculation of Relative DensityASTM D4254$300.00Density of Hydraulic Cement ASTM C188$275.00 Volatile Organic Content EPA 8260BQORSemi Volatile Organics by GC/Ms (Basic Target List) EPA 8270CQORTotal Organic CarbonASTM 2974/EPA 5310BmQORICP Metals Concentration EPA 6020 - CAM/CCR 17QORTotal Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SSEPA 8015BQORICP Metals Concentration EPA 6020QORpH EPA 9045D$450.00 Sequential Batch Extraction of Waste with Acidic Extraction FluidASTM D5284QORChromium Soluble EPA 7196AQORMoisture, Ash and Organic Matter of Peat and Other Organic Soils (Organic Content)ASTM D2974$250.00Universal Soil Classification System (USCS) Test ASTM D2487$400.00California Bearing Ratio Test ASTM D1883$400.00Unconfined Compressive Strength of Cohesive SoilASTM D2166$250.00ASPHALT National CodeBituminous Material Content of Asphalitic Concrete Mixtures By The Nuclear Method$900.00Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172$750.00$375.00Determining Low Temperature Performance Grade (PG) of Asphalt Binders ASTM 6816QORThickness/Height of Compacted Bituminous Paving Mixture Specimens (Cores) ASTM D3549$250.00Bituminous Mixtures Utilizing Four Inch Marshall Apparatus $325.00Method of Prep of Bituminous Mixture Test Specimens ASTM D6926$250.00Bulk Specific Gravity and Density of Compacted Bituminous Mixtures (LTMD) ASTM D1188 and D2726$900.00Indirect Tensile (IDT) Strength of Bituminous Mixtures (TSR) ASTM D6931QORMechanical Size Analysis (Coarse and Fine) of Extracted Aggregate ASTM D5444$350.00Marshall Stability and Flow of Bituminous Mixtures ASTM D6927$900.00$175.00Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041$350.00$140.00Swell of Bituminous Mixtures$350.00Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in AsphaltASTM D1461 $850.00Preperation of HMA Superpave Gyratory Compaction AASHTO T312$900.00Determination of Voids in Compacted Bituminous Mixtures $450.00Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method ASTM D6307$400.00Determination of Asphalt Binder Content of Asphaltic Concrete Mixtures (RAP) by the Ignition Method$400.00Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method ASTM D6307$400.00Determination of Asphalt and Moisture Contents of Bituminous Mixtures by Microwave Oven$400.00Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6)ASTM D1075$2,000.00Compressive Strength of Bituminous Mixtures ASTM D1074$250.00* Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established ratesfor laboratory technician.** Does not include sample preparation or sieve analysis
LAB SOILS AND ASPHALT TESTS
All fees subject to Basis of Charges
EXHIBIT B
9070 Center Avenue, Rancho Cucamonga, CA 91730 | O: 909.587.6374www.fenaghengineering.com COST PROPOSAL FORMStandard DiscountedMETALS MATERIALS MECHANICAL TESTS National Code Rate/Each Rate/EachMechanical Testing of Steel Products (General Tensile)ASTM A370$325.00Fillet Weld Break Test for Qualification (Welding)AWS B4.0$125.00Tension Testing of Metallic Materials (Welding Coupon Tensile)ASTM E8, B557 and AWS B4.0$325.00Mechanical Testing of Steel Products (Couplers)ASTM A370$325.00Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic Materials ASTM E2248 and ASTM E23QORTesting, Practices, and Terminology for Chemical Analysis of Steel ProductsASTM A751$300.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #3-#8ASTM A370 and E290$250.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #9-#11ASTM A370 and E290$300.00Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #14+ASTM A370 and E290QORMechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete Reinforcement ASTM A370, A82 and A185$300.00Guided Bend Test for Ductility of Welds, Mechanical Testing of WeldsASTM E190 and AWS B4.0$175.00Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor Bolts Only (Tension and Yield) ASTM F307, F1554 and F606$350.00Rockwell Hardness of Metallic Materials ASTM E18$100.00Proof Test for Carbon and Alloy Steel (Nuts Only)ASTM A194 or A563$225.00Radiographic Examination of Metallic Castings/WeldmentsASTM E94, E1030 and E1032QORMacroetching Metals and AlloysASTM E340, E381 and AWS$225.00Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (HSB Assemblies) ASTM F606$250.00Mechanical Testing of Steel Products (Terminators Tensile)ASTM A370 $250.00Steel Strand, Uncoated Seven-Wire for Prestressed Concrete ASTM A416 and A1061$1,000.00OTHER MATERIALS MECHANICAL TESTSStrength for Sewn or Bonded Seams of GeotextilesASTM D4884 $400.00Tearing Strength of Fabrics by the Tongue (Single Rip) ProcedureASTM D2261 $400.00Breaking Strength and Elongation of Textile Fabrics (Grab Test)ASTM D5034 $350.00Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars (FRP) ASTM D3039 $800.00Moisture Content of Non-Typical Materials ASTM C566$250.00Aluminum Oxide Content ASTM C25$750.00Viscosity of Non-Typical Materials ASTM D2196$450.00Plastic Ultimate Tensile ASTM D638$350.00FIREPROOFINGThickness and Density of Sprayed Fire-Resistive Material (SFRM)ASTM E605$250.00Cohesion/Adhesion of Sprayed Fire-Resistive Materials (Test Kit Only)ASTM E736$100.00CONTACT INFORMATIONArizona: 1746 E. Madison Street, Suite 5 Phoenix, AZ 85034 P 480.867.6877Nevada: 3842 E. Post Road, Suite B Las Vegas, NV 89120 P 702.449.2132New England: 12 Tech Cir Natick, MA 01760 P 617.938.3774New York: 54-21 73rd Place Maspeth, NY 11378 P 516.423.3482Northern California: 3942 Valley Avenue, Suite A Pleasanton, CA 94566 P 925.403.4747Southern California: 9070 Center Avenue Rancho Cucamonga, CA 91730 P 909.587.6374Texas: 3709 Promontory Point Drive, Suite 210 Austin, TX 78744 P 925.403.4747
LAB METALS AND OTHER MATERIALS TESTS
All fees subject to Basis of Charges
EXHIBIT B
Item Number: 21
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Industrial Wastewater Treatment Plant - Amendment No. 14 to Contract with Woodard and Curran
Recommendation:
That the Honorable City Council approve Amendment No. 14 to the contract with Woodard and Curran for the operation of the Industrial Wastewater Treatment Plant, increasing compensation to account for sales tax and base markup fees inadvertently omitted from the additional scope approved under Amendment No. 13.
Fiscal Impact:
This action will result in a fiscal impact of $101,192.39. An additional appropriation is not required. The adjusted compensation will increase the first-year expense from $515,630.00 to $616,822.39 in Fiscal Year 2022/2023. Annual payments for years two through twelve will increase by $81,567.39, for a total of $497,197.39 per year, to be included in future fiscal year budgets. This project will be funded by Fund 412, Wastewater Treatment Facility. The budget account number and the amount available in the budget are shown below.
Account No. Amount Available
4120710-55040-76034 $ 506,500.00
Strategic Plan Goal:
This item aligns with Goal E., Strategy 1. in the Strategic Plan, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.” Background:
On June 17, 2008, City Council approved a contract with Woodard & Curran (W&C) for the design and operation of the Industrial Wastewater Treatment Plant (IWWTP), which 2 9
5 8
started operating in July of 2010. Amendment Nos. 1 through 12 authorized the compensation for various capital projects or extended the term of the contract.
The IWWTP treatment process uses membrane bioreactors (MBR), a method consisting of microfiltration combined with a biological process to treat wastewater. The membranes, which are hollow fibers, separate solids from the liquid that passes through the membranes. The membranes are assembled in a series of modules and combined to make an MBR unit. Wastewater flows through a number of these MBR units in four membrane trains in the IWWTP as part of the treatment process.
On May 13, 2022, City Council approved Amendment No. 13 to the contract with W&C.
This extended the term of the contract until 2034, authorized the replacement of the MBR, and resulted in W&C entering into a twelve -year service agreement with Suez, the vendor that supplies, replaces, and services the MBR. Under Amendment No. 13, the additional compensation to W&C for the twelve-year service agreement was $515,630 for the first year (Fiscal Year 2022/2023) and $415,630 per year for the subsequent eleven years.
Discussion:
For the compensation authorized by Amendment No. 13, taxes at a rate of 8.75 percent for the MBR and the W&C base markup fee of 10 percent were inadvertently omitted. In the original contract, Section C.2.01.C established the base markup fee at 10 percent.
Including the taxes and base markup fee results in an increase in compensation for the first year of $101,192.39, for a total of $616,822.39. The increase in compensation for the next eleven years would be $81,567.39 per year for a total of $497,197.39 per year.
Staff have reviewed the pricing and original contract and concluded that the additional compensation should be authorized. Amendment No. 14, which would authorize the additional compensation, has been prepared by the City Attorney’s office, reviewed by staff and W&C and is ready for approval. Amendment No. 13 and the original contract with W&C have been attached for reference.
Staff recommends that the City Council approve Amendment No. 14 to the contract with Woodard and Curran for the operation of the Industrial Wastewater Treatment Plant, increasing compensation to account for sales tax and base markup fees inadvertently omitted from the additional scope approved under Amendment No. 13.
Staff is available for any questions that City Council may have.
Attachments: A. Amendment No. 14
B. Amendment No. 13
C. Original Contract
Attachment A
Amendment No. 14
1 | Page Consultant/Professional Services Provider Agreement Woodard & Curran Amendment No 14
AMENDMENT NUMBER 14
TO
CONSULTANT/PROFESSIONAL SERVICES PROVIDER AGREEMENT
BY AND BETWEEN
CITY OF VICTORVILLE AND WOODARD & CURRAN, INC. FOR OPERATION AND
MAINTENANCE OF SCLA WASTEWATER TREATMENT PLANT
THIS AMENDMENT NUMBER 14 (“Amendment No. 14”) is made and entered into this _ day of ____________, 2023, by and between the City of Victorville, a municipal corporation, organized and existing in the County of San Bernardino under and by virtue of the laws of the State of California (hereinafter referred to as “City”), and Woodard & Curran, Inc., a Maine Corporation, hereinafter referred to as “ Consultant”. City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively as the “Parties”.
RECITALS
A. WHEREAS, the City has a Professional Services Agreement with Consultant to provide professional services for the Operation and Maintenance of SCLA Wastewater Treatment Plant (the “Professional Services Agreement ”).
The Professional Services Agreement has been amended on thirteen (13) prior occasions, and said Professional Services Agreement, as amended, shall hereinafter be referred to as the “Original Agreement”; and
B. WHEREAS, the Original Agreement was entered into for the purposes of having Consultant provide design, engineering, operation and maintenance services for the City’s Industrial Waste Water Treatment Plant (“IWWTP”), located at SCLA; and
C. WHEREAS, the IWWTP provides wastewater treatment services to, amongst others, the Dr. Pepper Snapple Group (“DPSG”) manufacturing plant which is also located at SCLA; and
D. WHEREAS, pursuant to the Original Agreement , Consultant facilitated the installation of a Membrane bioreactor which has not been operating as planned and therefore requires replacement; and
E. WHEREAS, the failure of the Membrane bioreactor lead to a dispute between Consultant and the City as to the obligations of the Parties under the Original Agreement (the “Dispute”); and
2 | Page Consultant/Professional Services Provider Agreement Woodard & Curran Amendment No 14
F. WHEREAS, the Parties entered into Amendment No. 13 to the Original Agreement in order to resolve the Dispute and to enable Consultant to enter into a Membrane Replacement Agreement with Suez Water Technologies and Solutions/ZENON Environmental Corporation (the “MBR Agreement”); and
G. WHEREAS, the Parties deem it desirable to further issue this Amendment No. 14 to amend the Original Agreement in order to increase the compensation amounts that were described in Amendment No. 13 in connection with the Consultant’s management of the MBR Agreement; and
H. WHEREAS, the increase in the compensation amounts is necessary because the amounts set forth in Amendment No. 13 inadvertently failed to take into consideration the taxes to be incurred by Consultant as well as Consultant’s 10% fee that was previously negotiated between the Parties.
I. NOW THEREFORE, in consideration of the covenants, conditions, and promises contained herein and for such other good and valuable consideration, receipt of which is hereby acknowledged, the Parties agree to amend the Original Agreement as stated below.
CONTRACT AMENDMENT
The Original Agreement is hereby amended as follows:
1. The recitals set forth above are true and correct and are hereby incorporated as part of this Amendment No. 14 by this reference.
2. The compensation amounts payable to Consultant as set forth in Sections 3 and 4 of Amendment No. 13 are hereby increased such that the compensation amount for Fiscal Year 22- 23 will be increased to $616,822.39 and the compensation for each subsequent year after Fiscal Year 22-23 (through June 30, 2034) shall be increased to $497,197.39.
3. Except as amended herein, all the terms and conditions of the Original Agreement and all previous amendments shall remain in full force and effect.
(SIGNATURES ON NEXT PAGE)
3 | Page Consultant/Professional Services Provider Agreement Woodard & Curran Amendment No 14
IN WITNESS WHEREOF, the P arties hereto have caused this Amendment N o. 14 to the Original Agreement to be entered as of the dates written below.
THE CITY OF VICTORVILLE WOODARD & CURRAN, INC.
By: By:
Debra Jones, Mayor
Dated: __________________________ Dated: _____________________
THE CITY OF VICTORVILLE APPROVED AS TO FORM
By: By: ____________________________
Lee Brown, Andre de Bortnowsky,
Risk Manager City Attorney
Dated: __________________________ Dated: _____________________
P:\APPS\WPDATA\VVCA\0007 - ENGINEERING & PUBLIC WORKS\DOC\198.5-AMENDMENT 14 WC CL 1.20.23.DOCX
Attachment B
Amendment No. 13
ATTACHMENT C
Item Number: 22
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
La Mesa / Nisqualli Interchange 404 Permit Compliance Mitigation Site Coordination - Amendment No. 4 to the Consultant / Professional Services Provider Agreement with
WSP USA
Recommendation:
That the Honorable City Council approve Amendment No. 4 to the Consultant / Professional Services Provider Agreement with WSP USA Inc., to increase the compensation by an amount not to exceed of $54,296.00 for the La Mesa / Nisqualli Interchange Permit Compliance and Mitigation Site Coordination.
Fiscal Impact:
This action will have a fiscal impact of $54,296.00, increasing the contract not to exceed amount from $136,580.00 to $190,876.00. An additional appropriation is not necessary; sufficient funds are in the account to cover the additional expense in this fiscal year. The budget account number, account description and amount available in the budget are shown below.
Budget Account No. Account Description Amount Available 2504500-52300-60005 Measure I/Nisqualli Contract Services $72,925.58 Strategic Plan Goal:
This item aligns with Goal E., Strategy 1. in the Strategic Plan, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.” Background:
The La Mesa Road / Nisqualli Road Interchange had ongoing environmental monitoring for three permits that were required by environmental resource agencies. The permits were required because the construction of the interchange had permanent wetland 2 9
5 9
impacts in the Oro Grande Wash which runs through the interchange limits. The permits are as follows: the US Army Corps of Engineers (USACOE) 404 Dredge and Fill permit; the Lahontan Regional Water Quality Control Board 401 Water Quality Certification permit; and the California Department of Fish and Wildlife (CDFW) 1602 Streambed Alteration permit. The City was required to set aside and preserve 6.12 acres of land with equivalent habitat to mitigate the removal of habitat in the wash due to the interchange construction. The land was set aside on four City-owned parcels adjacent to or in the Mojave River. The parcels are located about 0.5 miles east of Shay Road and 0.2 miles north of the Shay Road / Phantom East intersection. Please refer to Attachment A, a map of the mitigation site.
The environmental permits require that the mitigation site be preserved in perpetuity as habitat area with a long-term management plan. It will be necessary to record a conservation easement over the 6.12 acres and contract with a qualified organization to maintain the site on a long-term basis. This organization will be responsible for ongoing removal of trash and invasive non-native plant species and environmental reporting to the three environmental permitting agencies.
On October 3, 2017, City Council approved a Consultant / Professional Services Provider Agreement with WSP, USA Inc., (WSP) for the La Mesa / Nisqualli Interchange Permit Compliance and Mitigation Site Coordination in an amount not to exceed of $26,960.
On June 18, 2019, City Council approved a Consultant / Professional Services Provider Agreement with Rivers and Lands Conservancy (RLC) in an amount not to exceed of $28,000. RLC will be the organization that is proposed to maintain the mitigation site for a long-term basis. The scope of the agreement included preparation of a baseline report on the environmental condition of the mitigation site and creating a long-term management plan.
On April 21, 2020, City Council approved Amendment No. 1 to the agreement with WSP, in an amount not to exceed of $26,960, increasing the compensation to $57,290. The amendment was required due to additional tasks needed to comply with the requirements of the three environmental permitting agencies.
On November 3, 2020, City Council approved Amendment No. 2 to the agreement with WSP, in an amount not to exceed of $57,290, increasing the compensation to $93,921.
The amendment was required due to additional tasks needed to comply with the requirements of the three environmental permitting agencies.
On January 18, 2022, City Council approved Amendment No. 3 to the agreement with WSP, in an amount not to exceed of $42,659, increasing the compensation to $136,580.
The amendment was also required due to additional tasks needed to comply with the requirements of the three environmental permitting agencies. 2 9
5 9
Discussion:
Additional tasks need to be completed to comply with additional permit requirements from the environmental resource agencies, in particular, the USACOE and CDFW. The resource agencies required that the responsibilities for the maintenance and long-term management of the site be clearly separated. This resulted in revising documents and will require additional review time by the resource agencies, RCL and the City. In summary, the additional tasks include the following: coordinate the review and approval of the RLC agreements; coordinate the review and approval of the final version of the long-term management plan and conservation easement; assist in the close out of the environmental permits. The documents needed to complete the City’s responsibilities and to close out the environmental permits include the following: an endowment agreement with RLC; a mitigation services agreement with RLC; a final long-term management plan; and a final conservation easement. All these documents must be approved by the USACOE and CDFW before approval and execution. The estimated fee to complete these tasks is $54,296. It will be necessary to amend the agreement with WSP to increase the contract amount for these additional tasks.
Staff recommends that the Honorable City Council approve Amendment No. 4 to the Consultant / Professional Services Provider Agreement with WSP USA Inc., to increase the compensation by an amount not to exceed of $54,296.00 for the La Mesa / Nisqualli Interchange Permit Compliance and Mitigation Site Coordination.
Staff remains available for any questions that the City Council may have.
Attachments: A. Location Map of Mitigation Site
B. Amendment No. 4
C. Original Agreement and Amendment Nos. 1 through 3
ATTACHMENT A
ATTACHMENT B
Consultant/Professional Services Provider Agreement/WSP USA INC./PROJECT ESC18-016/AMENDMENT #3 P
age 1 of 3
AMENDMENT NUMBER: FOUR
TO
CONSULTANT/PROFESSIONAL SERVICES PROVIDER
AGREEMENT
BY AND BETWEEN
CITY OF VICTORVILLE
AND
WSP USA INC.
FOR
LA MESA/NISQUALLI 404 PERMIT COMPLIANCE – PERMIT MODIFICATION AND
MITIGATION SITE COORDINATION,
PROJECT ESC18-016
T
HIS AMENDMENT (the “Amendment”) is made and entered in to this ____ day of _______, 2023 by and between the City of Victorville, a municipal corporation, organized and existing in the County of San Bernardino under and by virtue of the laws of the State of California (hereinafter referred to as “City”), and WSP USA Inc., a corporation, hereinafter referred to as “Consul tant”, City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties” for La Mesa/Nisqualli 404 Permit Compliance – Permit Modification and Mitigation Site Coordination, Project ESC18-016.
R
ecitals
1. W
HEREAS, the City has a Consultant/Professional Services Provider Agreement (hereinafter referred to as the “Original Agreement”) with the Consultant to provide Mesa/Nisqualli 404 Permit Compliance – Permit Modification and Mitigation Site Coordination, Project ESC18-016; and
2. W
HEREAS, on or about June 3, 2020, Amendment One (1) was issued to the Original Agreement to amend Section 3, Compensation, cumulative not to exceed sum from $26,960.00 to $57,290.00; revise Sections 2 and 4, Proposal to include additional services; and amend Section 6, Term of Agreement to expire December 31, 2020; and
3. W
HEREAS, on or about December 1, 2020, Amendment Two (2) to the Original Agreement to amend Section 3., Compensation, to include an increase of $36,631.00 (as approved by City Council at their meeting held November 3, 2020), thereby amending the total cumulative compensation from a not to exceed $57,290 to $93,921.00; and amend Section 6, Term of Agreement to expire June 30, 2021; and
4. W
HEREAS, on or about March 9, 2022 Amendment Three (3) to the Original Agreement was approved to amend Section 3., Compensation, to include an increase of $43,659.00 for additional services, thereby amending the total cumulative compensation from a not to exceed $93,921.00 to $137,580; and revise Sections 2 and 4, as well as the Proposal to include additional services; and amend Section 6, Term of Agreement to expire June 30, 2023; and
Consultant/Professional Services Provider Agreement/WSP USA INC./PROJECT ESC18-016/AMENDMENT #3
5. WHEREAS, it is the desire of the Parties to issue Amendment No. 4 to the Original Agreement (as amended) to amend Section 3. thereof Compensation, to include an increase of $54, 246.00 for additional services related to the permit requirements from the environmental resource agencies, specifically the U.S. Army Corps of Engineers (USACOE) 404 Dredge and Fill permit; the Lahontan Regional Water Quality Control Board for Water Quality Certification Permit; and the California Department of Fish and Wildlife (CDFW) 160 2 Streambed Alteration Permit. The total cumulative compensation will increase from the not exceed the amount of $136,580.00 to $190,876.00
6. WHEREAS, it is the desire of the Parties to amend the term of the Original Agreement so that it expires on June 30, 2024.
7. NOW THEREFORE , in consideration of the covenants, conditions, and promises contained herein and for such other good and valuable consideration, receipt of which is hereby acknowledged, the Parties are willing to amend the Original Agreement as stated below.
Contract Amendment
The Parties agree that the compensation provisions as set forth in the Original Agreement shall be amended as follows:
Section 3. – COMPENSATION – is amended as follows:
“The City shall pay to Consultant a cumulative sum not to exceed One Hundred Ninety Thousand Eight Hundred Seventy Six and 00/100 dollars ($ 190,876.00) for faithful performance of the services to be rendered under this Agreement………….”
Section 6. – TERM OF AGREEMENT - is amended as follows:
“The City hereby amends the Term of the Agreement to expire on June 30, 2024 (the “Termination Date”).”
The increase in Compensation is to cover the increase in permitting costs as described in Recital 5 hereof.
Except as amended herein, the terms and conditions of the Original Agreement and all previous amendments remain in full force and effect.
(SIGNATURES ON NEXT PAGE)
Consultant/Professional Services Provider Agreement/WSP USA INC./PROJECT ESC18-016/AMENDMENT #3
IN WITNESS WHEREOF, the parties hereto have caused the amendment to the Agreement to be entered as of the dates written below.
PARTY OF THE FIRST PART PARTY OF THE SECOND PART
THE CITY OF VICTORVILLE WSP USA INC.
By:_______________________________ By:________________________________ Debra Jones, Victor Martinez,
Mayor Vice President, Area Manager
Dated:______________________________ Dated:______________________________
ATTEST
By:_________________________________
Jennifer Thompson,
City Clerk
Dated:_______________________________
THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM
By:________________________________ By:______________________________ Lee Brown, Andre de Bortnowsky,
Risk Manager City Attorney
Dated:______________________________ Dated:_____________________________
P:\APPS\WPDATA\VVCA\0007 - ENGINEERING & PUBLIC WORKS\LA MESA NISQUALI\501.4 DRAFT AMENDMENT 4 WSP 1.25.23 CL V5.DOCX
ATTACHMENT C
Item Number: 23
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Santa Fe Wash Sewer Realignment Project - Amendment No. 1 to the Consultant / Professional Services Provider Agreement with Albert A. Webb Associates.
Recommendation:
That the Honorable City Council approve Amendment No. 1 to the Consultant / Professional Services Provider Agreement BM20-076 with Albert A. Webb Associates in an amount not to exceed $483,039.00 for the Santa Fe Wash Sewer Realignment Project.
Fiscal Impact:
This action will result in a fiscal impact of $489,039.00. An additional appropriation is not required. There are sufficient funds in the budget to cover the planned expenses. The budget account number, account description and amount available are shown below.
Budget Account Number Account Description Amount Available 4254500-55315-77439 Santa Fe Wash Sewer Realignment $700,000.00 Strategic Plan Goal:
This item aligns with Goal E., Strategy 1 in the Strategic Plan, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.” Background:
There is an existing City sewer main that runs along the west side of the BNSF Railroad from Bear Valley Rd. to north of Seneca Rd. A segment of this sewer main lies between Coad Road (the future Green Tree Boulevard alignment) and Ottawa Street to the south, all within the Santa Fe Wash which is within BNSF Railroad right-of-way. As a result, these sewer segments are very difficult to access for maintenance and are subject to erosion from stormwater flows within the Santa Fe Wash channel. Engineering staff proposed to relocate this sewer main further to the west, away from the BNSF railroad 2 9
6 7
right-of-way and the Santa Fe Wash channel. This realignment will facilitate better access for maintenance and protect the facility from potential erosion.
The ultimate goal of this sewer realignment project is to install a new 15-inch diameter sewer main and manholes parallel to the existing sewer main, approximately 20 feet to the west (outside of wash which is within the BNSF right-of-way). Since the sewer main is proposed to be relocated to the west, sewer easements will be required from adjacent properties. The existing facilities will be abandoned in place. Please refer to Attachment A, location map of the proposed sewer realignment project.
On October 6, 2020, the City Council approved a Consultant / Professional Services Provider Agreement with Albert A. Webb Associates, in an amount not to exceed of $420,000.00 for environmental, design, and right-of-way acquisition services for the Santa Fe Wash Sewer Realignment Project. Since then, preliminary work has been underway for environmental studies, the realigned sewer main, and a drainage study.
Discussion:
The original scope proposed to realign approximately 3,500-feet of the existing sewer main from approximately 350-feet south of Ottawa Street to Coad Road. During the Green Tree Boulevard Extension Project and the construction of a new bridge over the BNSF railroad right-of-way, Engineering and Public Works staff evaluated the existing sewer to the north of the newly constructed bridge and concluded that it should also be realigned outside of BNSF right-of-way. Another sewer main segment, further to the south of Ottawa Street, was evaluated; it was concluded that this segment should also be realigned away from the wash and added to the project. Likewise, realigning these segments will improve access for maintenance and reduce the risk of potential damage due to erosion.
The revised scope will extend the proposed sewer realignment approximately 1,150-feet downstream and another 350-feet upstream further south of Ottawa Street. This additional length will also require embankment slope protection facilities (i.e., rock riprap, concrete cast-in-place box culverts, etc.) along the west side of the wash to mitigate future erosion.
Additional services will be required for environmental, design, and right of way acquisition tasks. Additional environmental tasks include added technical studies, expanded technical studies due to a larger environmental footprint, an expanded CEQA analysis for the additional project specific facilities needed, and a programmatic evaluation of the possible future improvements along the extended alignment. Additional design tasks include an expanded drainage feasibility study, additional design work for the slope protection, and additional design of the added sewer main segments. Additional right of way tasks will be required due to more affected parcels. These tasks include acquiring more sewer easements, temporary construction easements and permits to enter private properties, and more coordination with BNSF to obtain a permit for construction.
The additional scope of services were not included in the consultant’s original agreement for professional services. Therefore, an amendment to the Consultant / Professional 2 9
6 7
Services Provider Agreement will be required. Albert A. Webb Associates has submitted a proposed scope and fee for the additional services listed above. The estimated fee is $483,039.00. Engineering staff have reviewed the proposal and concluded that the scope and fee are reasonable for the required additional tasks. An amendment to the to the current agreement with Albert A. Webb Associates has been prepared; please refer to Attachment B, which is Amendment No. 1.
Staff recommends that the Honorable City Council approve Amendment No. 1 to the Consultant/Professional Services Provider Agreement with Albert A. Webb Associates in an amount not to exceed of $483,039.00 for the Santa Fe Wash Sewer Realignment Project.
Staff remains available to answer any questions the Council may have.
Attachments: A. Location Map
B. Amendment No. 1
ATTACHMENT A
ATTACHMENT B
Consultant/Professional Services Provider Agreement/Albert A. Webb Associates/Project BM20-076
AMENDMENT NUMBER: ONE
TO
CONSULTANT/PROFESSIONAL SERVICES PROVIDER
AGREEMENT
BY AND BETWEEN
CITY OF VICTORVILLE
AND
ALBERT A. WEBB ASSOCIATES
FOR
SANTA FE WASH SEWER REALIGNMENT,
PROJECT BM20-076
THIS AMENDMENT (the “Amendment”) is made and entered into this ____ day of _______ , 2022, by and between the City of Victorville, a municipal corporation, organized and existing in the County of San Bernardino under and by virtue of the laws of the State of California (hereinafter referred to as “Cit y”), and Albert A. Webb, a California corporation, hereinafter referred to as “Consultant”, City and Consultant are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties”.
Recitals
1. WHEREAS, the City has a Consultant/Professional Services Provider Agreement (hereinafter referred to as the “Original Agreement”) with the Consultant to provide Santa Fe Wash Sewer Realignment; and
2. WHEREAS, it is the desire of the Parties to issue Amendment One (1) to the Original Agreement to amend to increase Section 3., Compensation by $483,039.00, thereby revising the cumulative not to exceed sum from $420,000.00 to $903,039.00; and revise Section 4. Consultant’s Proposal to include proposal for additional services; and
3. NOW THEREFORE , in consideration of the covenants, conditions, and promises contained herein and for such other good and valuable consideration, receipt of which is hereby acknowledged, the Parties are willing to amend the Original Agreement as stated below.
Contract Amendment
Section 3. – COMPENSATION – is amended as follows:
“The City shall pay to Consultant a cumulative sum not to exceed Nine Hundred Three Thousand Thirty-nine and 00/100 dollars ($903,039.00) for faithful performance of the services to be rendered under this Agreement, subject to the Consultant’s Proposal provisions of Section 4, below.”
Consultant/Professional Services Provider Agreement/Albert A. Webb Associates/Project BM20-076
Section 4. – CONSULTANT’S PROPOSAL – is amended as follows:
“The City shall pay Consultant for those additional services set forth in Consultant’s Amendment 1 Proposal dated December 10, 2022, attached hereto as Exhibit A -1 and hereby incorporated as part of this agreement by this reference.”
Except as amended herein, t he terms and conditions of the O riginal Agreement and all previous amendments remain in full force and effect.
(SIGNATURES ON NEXT PAGE)
Consultant/Professional Services Provider Agreement/Albert A. Webb Associates/Project BM20-076
IN WITNESS WHEREOF, the parties hereto have caused the Amendment to the Original Agreement to be entered as of the dates written below.
PARTY OF THE FIRST PART PARTY OF THE SECOND PART
THE CITY OF VICTORVILLE ALBERT A. WEBB ASSOCIATES
By:______________________________ By:________________________________ Debra Jones, Bruce Davis, P.E.,
Mayor Senior Vice President
Dated:_____________________________ Dated:______________________________
ATTEST
By:_________________________________
Jennifer Thompson,
City Clerk
Dated:_______________________________
THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM
By:________________________________ By:______________________________ Lee Brown, Andre de Bortnowsky,
Risk Manager City Attorney
Dated:______________________________ Dated:_____________________________
H:\2020\20-0203\Proposals, Contracts, & Change Orders\WEBB\BARS\2022-12-10 Shaw Letter RBAR.docx W
O 2020-0203
De
cember 10, 2022
Mr. Shaw Nawaz, PE, Project Engineer
CITY OF VICTORVILLE
14343 Civic Drive
Victorville, CA 92392
R
e: Revised Budget Amendment Request (RBAR)
Santa Fe Wash Sewer Realignment Project BM20-076
Dear Mr. Nawaz:
Albert A. Webb Associates (WEBB) is under contract with City of Victorville to provide Engineering Services for the design of the above project. As you are aware, the scope of the project has evolved and our original budget will not cover the additional tasks to complete the project. City has performed the field walk with WEBB and Dokken (sub-consultant) to identify the additional areas and scope of work.
WEBB is pleased to provide you with this Revised Budget Amendment Request.
Enclosed you will find Scope of Work (Exhibit “A”), and Compensation for Services (Exhibit “B”) for your review and consideration.
If you find this proposal acceptable, please notify our office so a contract agreement can be prepared. We appreciate this opportunity to be of service to your firm and look forward to hearing from you. If you have any questions regarding this proposal, please contact us at 951-686-1070.
Sincerely,
ALBERT A. WEBB ASSOCIATES
Attachments:
Exhibit “A” - WEBB Scope of Work
Exhibit “B” - WEBB Compensation for Services
Appendix A – Detailed Scope of Work and Fee for Land Acquisition (Dokken) Appendix B – Detailed Scope of Work and Drainage
Appendix C – Detailed Scope of Work for Environmental Tasks Si
ming Zhang, P.E.
Senior Engineer
Bruce A. Davis, P.E.
Senior Vice President
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
H:\2020\20-0203\Proposals, Contracts, & Change Orders\WEBB\BARS\2022-12-10 Shaw Letter RBAR.docx
EXHIBIT “A” SCOPE OF WORK
City has requested the scope of the project is exten ded in order to completely remove the existing sewer outside of the existing Santa Fe Wash, construction of new slope protection along portions of the westerly bank of the wash and future construction of improvements for access to the proposed sewer alignment. The future improvements might be new culverts conveying tributary flows into the main wash to construct a continuous access road to the proposed sewer alignment. The original scope proposed to re-align the existing sewer approximately 3,500 feet from a point north of Ottawa Avenue to Coad Road. The revised scope will extend the proposed sewer re-alignment approximately 1,150 feet downstream along a new alignment outside of the existing wash and 350 feet upstream along the existing wash. The City also requested Webb to design slope protection facilities along the west side of the wash to mitigate future erosion.
The additional scope will require additional right-of-way acquisition to cover the extended area, coordination for permits to enter for access to private properties during the design phase, coordination with BNSF to obtain permit for construction, an expanded drainage feasibility study, additional design work for the slope protection, additional design of the sewer main extension, additional and expanded technical studies for the environmental documentation as well as an expanded CEQA analysis for the additional project specific facilities needed and a programmatic evaluation of the possible future improvements along the extended alignment.
The following is a summary of the additional tasks:
Task 1 - Preliminary design to select an alignment within the extended alignment. Options for the upstream alignment are limited within the access road, but options for the downstream alignment could vary more and require additional analysis.
Task 2 - Right-of-Way Services for additional properties impacted by the extended alignment and permits to enter private properties during the design phase. See Appendix A for details.
Task 3 - Geotechnical Investigation scaled up for extended alignment requiring two additional borings.
Task 4 - Preparation of design plans for the extended sewer main.
Task 5 - Preparation of the Wash slope protection plans including impact on Nutro Company basin spillway, adding box culverts at lateral crossings, incorporation with newly constructed bridge, and etc. See Appendix B for details.
Task 6 - Preparation of separate bid package for the Wash slope protection.
Task 7 - Field survey to identify existing benchmarks and controls to tie City supplied aerial topography to existing ground surface to replace destroyed benchmarks used to create the City supplied aerial topography.
Task 8 – Preparation of twenty-two (22) individual Right-of-Entry exhibits for each property that adjacent to Santa Fe Wash to facilitate implementing Task 2.
Task 9 – Assist City on coordination with BNSF regarding Santa Fe Wash slope protection and sewer relocation, prepare encroachment permit application, address BNSF’s comments, one (1) meeting with BNSF staff.
Task 10 - Additional Environmental Services – Our original contract assumed WEBB would prepare a project-specific Initial Study/Mitigated Negative Declaration (IS/MND) for the sewer pipeline alignment EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
H:\2020\20-0203\Proposals, Contracts, & Change Orders\WEBB\BARS\2022-12-10 Shaw Letter RBAR.docx
which was to be located within the exiting Santa Fe wash channel. The previously approved scope of work assumed most of the proposed project was confined to this disturbed area only. Given the expansion of the study area to include additional pipeline alignment into areas of native habitat as well as the additional for potential jurisdictional waters to be impacted by the channel stabilization design added to the project, additional scope is required, as described further below, and outlined in detail in the Appendix C.
Since contract authorization, WEBB has coordinated with the engineering team on project design, environmental constraints, and initiated some of the technical study work. It is WEBB’s understanding that the project design has changed substantially. Not only has the project footprint expanded, but the approach for the environmental analysis has also changed.
WEBB understands that the City would like the project to evaluate the sewer line alignment at a project- specific level and additional land will be evaluated at a programmatic level for ultimate improvements per the Master Drainage Plan (MDP) considering that not all future facilities have been identified yet.
The budget proposed herein incorporates the effort spent to date coordinating the project constraints since authorization in 2020, changes to the project footprint, and inclusion of a programmatic analysis for ultimate MDP improvements in the CEQA document in accordance with the Revised Scope of Work Exhibit prepared on May 31, 2022, and provided below.
Lately, additional areas added to the project area will require revisions to the technical studies. Updates to the biological resources assessment and cultural resources assessment are also included in this contract amendment and outlined in detail in the attached.
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
H:\2020\20-0203\Proposals, Contracts, & Change Orders\WEBB\BARS\2022-12-10 Shaw Letter RBAR.docx
Map 2 – Revised Scope of Work and Project Limitation
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
H:\2020\20-0203\Proposals, Contracts, & Change Orders\WEBB\BARS\2022-12-10 Shaw Letter RBAR.docx
EXHIBIT “B” COMPENSATION FOR SERVICES
The total fees for services shown in the Scope of Work (Exhibit A) are $483,039. This amount will not be exceeded without prior authorization from client. A breakdown of our fees is listed below:
Estimated Fee
TASK 1 – Preliminary Design $ 9,830
TASK 2 – Right-of-Way Services (Dokken) $ 172,929
TASK 3 – Extended Geotechnical Investigation $ 6,350
TASK 4 – Extended Sewer Design Plans $ 16,900
TASK 5 – Wash Slope Protection Plans $114,530
TASK 6 – Preparation of Bid Package for Slope Protection Work $ 5,581
TASK 7 – Field Survey for benchmarks $ 11,484
TASK 8 – Preparation of (22) Individual Right-of Entry Exhibit $ 11,260
TASK 9 – Coordination with BNSF $ 7,761
TASK 10 – Additional Environmental Scope $126,144
TOTAL OF Budget Amendment Request $483,039
Charges for in-house printing, copying, postage, outside services, and other services not specifically listed in the scope of work will be billed on a time and material basis in addition to the amount shown above in accordance with our attached Schedule of Fees. Checking and/or filing fees are not included in this contract, and shall be paid by the client directly to the appropriate governmental agency. Our services will be billed monthly on a time and materials basis by task.
If this is acceptable to you, please sign below with your authorization. Please also send us an amendment to our contract noting same.
I authorize Albert A. WEBB Associates to proceed with the scope of work as noted above:
______________________________________________
Signatures
______________________________________________
Name
______________________________________________
Date
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
PROJECT UNDERSTANDING-RIGHT OF WAY
It is anticipated that 13 parcels will require permanent and temporary rights as part of the project. Title is clouded on parcel 3090-491-04 as both parties on title are deceased. This property will require a probate action to take place in order to allow any property rights to be transferred to the City. There are five parcels owned by different ownerships but the same family. Negotiations with two of the three family members were recently completed by the City on another project. The owner’s representative may not allow access during the initial studies. If access is granted, compensation will be required. All testing associated with hazardous waste should be completed prior to the acquisition process as the owner will require the removal of the hazardous waste clauses in the acquisition documentation. Access to BNSF right of way for testing should be considered. In addition, the timeline to obtain the property rights for the above stated parcels is expected to exceed the typical timeline for negotiating property rights.
There are seven parcels that will require relocation assistance services. These properties will require right of way acquisitions and have personal property located within the proposed acquisition areas.
It is assumed that no acquisitions will be required from BNSF. 6 RIGHT OF WAY SERVICES
Provided below is summary of the scope of services and deliverables Dokken Engineering will provide, as required to the City of Victorville.
6.1. RIGHT OF WAY PROJECT MANAGEMENT AND COORDINATION SERVICES To eliminate any unforeseen issues, Dokken Engineering’s team works closely with the applicable funding sources to ensure all changes regarding certification, documentation, and procedures are implemented. By coordinating our efforts with Caltrans, Dokken Engineering ensures that all the current documentation and procedures are used for all right of way efforts for local public agency projects.
Dokken Engineering will do the following once a task is assigned:
Attain and review title reports and implement solutions for items that may affect title or cause a delay in escrow;
Provide all gathered information to the appraiser and attain a detailed timeline to complete the assigned task;
Monitor progress and provide any additional information to the designated appraiser; Review all reports supplied by the appraiser for quality assurance; Provide draft reports to the review appraiser for final review and recommendations; Prepare draft acquisition documentation for Client review and approval; Provide final appraisal report, appraisal review, and acquisition documentation to the Client for final review;
Prepare staff reports for approval of just compensation; Make offers in person to each property owner;
Attain executed acquisition documentation from each affected property owner; Provide possession documentation in lieu of purchase contracts; Supply condemnation support, if required;
Deliver fully executed documentation to escrow/title officers to close escrow and provide title insurance;
Coordinate the close of escrow and provide original copies of acquisition files to the Client; Provide the Client with original acquisition files.
Appendix A
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
Dokken Engineering will be available to attend meetings as the Client determines is necessary. Project meetings to discuss the project schedule and to address challenges as they arise will be recommended. Dokken Engineering will provide a project tracking table with milestone dates to the Client on a monthly basis.
Additionally, when needed, Dokken Engineering can meet with the City Council to provide clarification or information on right of way acquisition matters. Additionally, Dokken Engineering will attend, at the request of the Client, any Public Community Meetings regarding the project.
Dokken’s right of way agents and, when necessary, the right of way manager will meet in person with property owners or the owner’s representative at the location of their choosing, whether it be the subject property, the owner’s home, or a neutral location. Dokken’s right of way agents will work with property owners’ schedules and are available to meet outside of normal business hours and on weekends, when required. Dokken will continue to meet with owners throughout the negotiations process until the acquisition process has been finalized. Lastly, during the escrow coordination process, Dokken will be available to the property owners to provide any necessary notary services required for the escrow documentation.
6.2. PROJECT TRACKING TABLE
Jamie Formico will maintain the project tracking table and ensure that it is sent to the Client on a monthly basis.
As a component of effective project management and in an effort to keep the project on schedule and the Client current with acquisition data, a project tracking table will be created. This table will outline milestones and supply completion dates, comments and any additional information the Client may request. Deliverables: Project Tracking Table
6.3. PERMIT TO ENTER
Permit to Enters will be needed from parcels: 3090-491-04, 3090-491-05, 3090-491-01, 3090-511-01, 3090-511- 03, 3090-511-04, 3090-531-01, 3090-531-04, 3090-551-05, 3090-551-02, 3090-571-10, 3090-551-07, 3090-571- 07, 3090-581-05, 3090-551-03, 3090-511-05, 0480-021-16. The Dokken Engineering right of way team will obtain permit to enter from ten property owners (totaling 17 parcels) for access associated with preliminary engineering, surveying, and environmental studies.
It is assumed that Albert A. Webb Associates will create survey maps with anticipated impacts for each Permit to Enter request.
Deliverables: Permit to Enters
6.4. ORDER TITLE REPORTS/TITLE RESEARCH
Dokken Engineering will obtain title reports for the following parcels: 3090-491-04, 3090-491-05, 3090-491-01, 3090-511-01, 3090-511-03, 3090-511-04, 3090-531-01, 3090-531-04, 3090-551-05, 3090-551-02, 3090-551-07, 3090-571-10, and 3090-571-07. Of these 13 parcels, there are eight ownerships. It is anticipated that eight preliminary title reports will be required.
The Dokken Engineering right of way team will perform all necessary research for each parcel being acquired.
Agents may resolve or oversee resolution of problems relating to unusual circumstances regarding title or ownership and uncover any flaws, noting any exceptions pertaining to property such as mortgage liens, restrictions, easements and rights of way.
Deliverables: Preliminary Title Reports
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
6.5. APPRAISAL PROCESS
13 parcels are affected: 3090-491-04, 3090-491-05, 3090-491-01, 3090-511-01, 3090-511-03, 3090-511-04, 3090-531-01, 3090-531-04, 3090-551-05, 3090-551-02, 3090-551-07, 3090-571-10, and 3090-571-07. Of these 13 parcels, there are eight ownerships. It is anticipated that eight appraisal reports will be completed by licensed General Real Estate Appraisers. Notice of intent to appraise letters along with acquisition policy brochures will be provided to all impacted property owners. Appraisals will be arranged so that the property owner may accompany the appraiser during the inspection of the property. This allows the property owner the opportunity to provide additional information to the appraiser.
All appraisals will be prepared by an appraiser licensed with the State of California and will comply with all laws applicable to the specific appraisal and the Uniform Standards of Professional Appraisal Practice 49 CFR
24.2(a)(3). Appraisals will include a summary and a complete analysis for all valuation conclusions.
Documentation obtained during the inspection, such as pictures, will be included in each report. Title information pertaining to ownership, drawings, and information relative to the parcel will be reviewed by the appraiser. Deliverables: Appraisal Reports
6.6. APPRAISAL REVIEW.
Eight appraisal reviews will be completed by a Certified General Real Estate Appraiser. Upon acceptance and approval of the property appraisals, an independent appraisal review will be completed by Dokken Engineering’s subconsultant. The review includes inspecting sales to determine comparability, reviewing appraisal for conformance to Uniform Standards of Professional Appraisal Practice, reviewing “highest and best use” conclusions, examining valuation methods, analyzing exhibits, checking mathematical calculations, and preparing a narrative report that describes the review process and sets forth the reasoning behind the review. An appraisal review is recommended to ensure that the appraisal is based on sound appraisal theory, contains appropriate documentation to support the appraisers’ conclusions and complies with regulatory codes. A recommendation of just compensation is then made based on the reviewed, collected, assembled, correlated, and analyzed data. Deliverables: Appraisal Review Reports
6.7. SUMMARY STATEMENTs
Dokken Engineering will complete a Summary Statement Relating to the Purchase of Real Property or an Interest Therein (Caltrans Exhibit 8-EX-16) for each property. This document will be delivered to property owners with the offer package during the initial meeting.
Deliverables: Summary Statement Relating to the Purchase of Real Property or an Interest Therein (Caltrans Exhibit 8-EX-16)
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
6.8 NEGOTIATIONS FOR RIGHT OF WAY
Acquisitions will be required from 13 parcels. The parcels affected are 3090-491-04, 3090-491-05, 3090-491-01, 3090-511-01, 3090-511-03, 3090-511-04, 3090-531-01, 3090-531-04, 3090-551-05, 3090-551-02, 3090-551-07, 3090-571-10, and 3090-571-07. Although there are 13 parcels but only eight ownerships, each parcel has its own concerns that will need to be negotiated, therefore the fee estimate is based upon negotiations associated with 13 properties.
All “Good Faith Negotiations” will be completed by Dokken Engineering’s Right of Way Team. After completion of the appraisal process and just compensation determination, Dokken Engineering will prepare the offer package and meet with all owners in person to present and explain the offer package details. The offer package will include the offer letter, written summary of just compensation with supporting appraisal information, property owner exhibit showing property map with right of way take locations, Title VI information, and “Your Property – Your Transportation Project” booklet. Dokken Engineering will negotiate with the property owner to arrive at a mutually agreeable settlement and prepare necessary purchase agreements such as Grant Deeds, Easement Deeds, and Temporary Construction Easement Deeds. Dokken Engineering will obtain receipt of delivery of offer and/or present and secure tenant information statements, as applicable, during the initial meeting.
Dokken Engineering will work closely with the Client to aid in the recommendation of the appropriate course of action regarding the various acquisitions with property owners requesting additional compensation and/or services beyond the initial offer package. Recommended settlement packages with justifications and impasse letters will be provided to the Client for review. Working with the property owners to agreeable terms will be Dokken Engineering’s focus. There may be situations where condemnation is unavoidable, such as clouds in the title. In the event the Client will need to attain property through the condemnation process, Dokken Engineering will assist in the preparation of all necessary condemnation reports, letters, and packages.
Additionally, Dokken Engineering will attend, at the request of the Client, any Public Community Meetings regarding the project.
Dokken Engineering’s Right of Way Agents hold California Real Estate Salesperson’s Licenses and are working under the direct supervision of a California Real Estate Licensed Broker. Deliverables: Right of Way Agreements, Grant and Easements Deeds, Administrative Settlements, Diaries, Written Summary of Acquisitions, Impasse Letters
6.9 RELOCATION ASSISTANCE
Seven properties have personal property located within the proposed right of way that will require relocation assistance services. Dokken Engineering will provide relocation services in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended, (42 USC 4601 et seq.) and implementing regulation, 49 CFR Part 24, as amended by MAP-21; California Government Code Section 7267 et seq.; California Code of Civil Procedure Sections 1263.010 to 1263.620 and 1255.010 to 1255.060; Housing and Community Development Title 25; State of California, Department of Transportation, Right of Way Manual, as applicable
Dokken Engineering will perform the following tasks:
• Conduct personal, on-site interview with displacee to ascertain relocation needs and special requirements. • Inform displacee of available relocation assistance services and benefits, and explain relocation process. • Prepare and distribute Informational Statements, Notices of Eligibility, 90-Day Notices to Vacate, and other notices, as may be required.
• Determine eligibility for reimbursement of moving expenses. • Prepare all applicable benefit claim forms, secure displacees’ signatures on claim forms, and submit claim forms to City for processing and payment.
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
• Assist displacee in locating suitable replacement sites and provide written referrals to same, as appropriate. • Provide on-going advisory assistance to displacee to minimize their hardship, including but not limited to referrals to replacement sites, and lists of movers and other vendors to assist in the move. • Prepare specifications for the move and inventory of personal property, insuring thorough coordination with City’s staff/consultants and/or legal counsel, so that no real property is included on the personal property inventory list.
• Coordinate the walk-through for a minimum of two bids and move estimates with movers. • Monitor the actual move to replacement site, as necessary. • Hand deliver benefit checks and other appropriate payments to claimants. • Maintain necessary documentation and provide City with status reports. • Prepare, obtain and submit Vacancy Reports for properties that are vacated. Deliverables: Relocation Claim Forms, Supporting Documentation, Diaries, Status Reports
6.10. ESCROW COORDINATION
Upon reaching an agreement on the terms and conditions of the acquisition with the property owner, Dokken will be available to assist the Client in opening escrow. Dokken will supply fully executed agreements along with other supporting information to escrow in order to close each transaction. Dokken will work closely with the Client to assist in the timely closing of all transactions. For the convenience of the property owner, our right of way team has a California Notary who will be available to notarize any documentation that is required. Fully executed deeds and easements will be delivered to the Client for acceptance prior to recording. In the event escrow services are not required, Dokken is available to perform these services and record the required documentation. Deliverables: Title Clearance, Escrow Documents and Closing Statements
7.0 RIGHT OF WAY CERTIFICATION/PROJECT CLOSE OUT
Dokken will coordinate with the Client and supply all required documentation for the right of way certification.
Dokken Engineering will review all acquisition documents for proper and complete execution, including formal acceptance.
Hard copies and electronic copies of the original acquisition file for each affected parcel will be provided to the Client upon completion of the project. Each acquisition file will contain property information, diary report, written correspondence, just compensation documentation, appraisal(s), offer package, negotiations, title documentation, copies of recorded documents, and all applicable documentation. Deliverables: Right of Way Certification Documentation, Original Acquisition Files
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
Schedule
This schedule demonstrates our unique understanding of delivering a right of way project. We built the following schedule based on the following considerations that demonstrate our technical ability:
The schedule includes all necessary right of way tasks to complete the right of way process.
Dokken will immediately begin the appraisal process upon receipt of the notice to proceed, preliminary title reports, and legal descriptions and plat maps. Delivery of plats & legals, project plans, and approval of just compensation by the City are paramount to the project staying on schedule.
Dokken will begin to prepare offer packages concurrently with the appraisal process to facilitate offers made upon approval of just compensation.
Task Timeframe
Receipt of Notice to Proceed --
Obtain Permit to Enters 60-90 days
Receipt of plat maps and legal descriptions from Client 14 days Receipt of preliminary title reports 21 days
Permit to Enters
Appraisals 60 days
Appraisal Review 20 days
Approval of Just Compensation 30 days
Receipt of contract documents and deeds from Client 7 days Right of Way Negotiations 200 days
Escrow Coordination 90-220 days (concurrently with
negotiations)
ROW Certification Coordination/Project Close out 30 days EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
PROJECT TEAM
Dokken has assembled a highly qualified team to provide right of way acquisition services to the City of Victorville.
Our team of acquisition agents and right of way support personnel includes professionals licensed and certified in California. Each team member will specialize in assigned tasks as outlined in the project scope and coordinate with the project manager. Dokken’s right of way team is led by our Right of Way Manager, Jamie Formico. She will be supported by developed staff who have worked together on many right of way projects.
EDUCATION
2001, BS Criminal Justice
CSU Sacramento
Completed Course: Eminent
Domain Law Basics (IRWA)
CERTIFICATION
CA Licensed Real Estate
Broker, #01445531
CA Licensed Notary
Senior Right of Way
Designation (SR/WA)
EXPERIENCE
18 years
AREAS OF EXPERTISE
Right of Way
Negotiations
Relocation Assistance
Eminent Domain Law
Uniform Act
Caltrans Policies
Cost Estimating
Title Review
JAMIE FORMICO, SR/WA | RIGHT OF WAY MANAGER
Ms. Jamie Formico has 18 years of right of way project management, real property acquisition and relocation experience. She is an active member of the International Right of Way Association, current Vice Chair of the International Transportation Committee, and past president for Chapter 27.
She specializes in right of way project management, utility relocation and railroad coordination.
RECENT RELEVANT EXPERIENCE
McHenry Avenue Widening, Stanislaus County, CA
N Indio Flood Control Project, Coachella Valley Water District US- 50 Western Placerville Interchange, Placerville, CA Gold Hill at Auburn Ravine Bridge Replacement, Placer County, CA Indian Canyon Bridge Widening and Bridge Replacement at UPRR, Palm Springs, CA
East Palm Canyon Over Palm Canyon Wash Bridge Rehabilitation, Palm Springs, CA
South Palm Canyon Drive Low Water Crossing, Palm Springs, CA Randall Avenue Widening Project, Rialto, CA
Alder Avenue Widening Project, Rialto, CA
Bear Valley Widening over BNSF, Victorville, CA
Green Tree Boulevard Extension, Victorville, CA
Yucca Loma Road and Bridge Widening, Apple Valley, CA High Speed Rail, Fresno to Bakersfield, Bakersfield to Palmdale, HSR Authority, CA
Gas Point Road Widening, Shasta County, CA
Trinity County HBP Bridges, Trinity County, CA
US-50 Western Placerville Interchange, Placerville, CA West Capitol Avenue Streetscape & Infrastructure Improvements, West Sacramento, CA
Utility and Railroad Coordination, UPRR and BNSF, Various Locations, Southern CA
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
PROPOSAL FOR APPRAISAL AND ACQUISITION SERVICES
SANTA FE WASH SEWER REALIGNMENT PROJECT
VANESSA COTHRAN, SR/WA | SENIOR RIGHT OF WAY AGENT
Ms. Vanessa Cothran has worked in the right of way industry on a variety of public projects. She has proven skills in delivering tasks working independently and as part of a team. Vanessa has demonstrated expertise in providing waiver valuations, acquisition, and relocation assistance services in a timely and cost-effective manner.
RECENT RELEVANT EXPERIENCE
N Indio Flood Control Project, Coachella Valley Water District US- 50 Western Placerville Interchange, Placerville, CA Gold Hill at Auburn Ravine Bridge Replacement, Placer County, CA Las Plumas/Lincoln Blvd Safe Routes to School, Butte County, CA Indian Canyon Bridge Widening and Bridge Replacement at UPRR, Palm Springs, CA
East Palm Canyon Over Palm Canyon Wash Bridge Rehabilitation, Palm Springs, CA
Bear Valley Widening over BNSF, Victorville, CA
Randall Avenue Widening, Rialto, CA
Linden Avenue Widening, Rialto, CA
Green Tree Extension, Victorville, CA
Yucca Loma Road and Bridge Widening, Apple Valley, CA Trinity County HBP Bridges, Trinity County, CA
Avenue 416/El Monte Way, Dinuba, CA
EDUCATION
2011, BA Sociology,
CSU Sacramento
Completed Course: Eminent
Domain Law Basics (IRWA)
CERTIFICATION
CA Licensed Real Estate
Salesperson #01788740
CA Licensed Notary
Senior Right of Way Agent
Designation (SR/WA)
EXPERIENCE
15 years
AREAS OF EXPERTISE
Waiver Valuations
Negotiations
Relocation Assistance
Document Preparation
Cost Estimating
Title Review
Escrow Coordination
EDUCATION
2003, BS Criminal Justice
CSU Sacramento
Completed Course: Eminent
Domain Law Basics (IRWA)
CERTIFICATION
CA Licensed Real Estate
Broker, # 01722818
CA Licensed Notary
Senior Right of Way
Designation (SR/WA)
EXPERIENCE
10 years
AREAS OF EXPERTISE
Waiver Valuations
Negotiations
Relocation Assistance
Eminent Domain Law
Uniform Act
Cost Estimating
Title Review
JASON ANDREWS, SR/WA | SENIOR RIGHT OF WAY AGENT
Mr. Andrews has provided real property acquisition and relocation experience for multiple city, county and state projects. He is past President of Chapter 27 of the International Right of Way Association. Mr. Andrews specializes in property acquisition, relocation assistance services, waiver valuations and right
-of-way
cost estimations.
RECENT RELEVANT EXPERIENCE
McHenry Avenue Widening, Stanislaus County, CA
N Indio Flood Control Project, Coachella Valley Water District US- 50 Western Placerville Interchange, Placerville, CA Gold Hill at Auburn Ravine Bridge Replacement, Placer County, CA Las Plumas/Lincoln Blvd Safe Routes to School, Butte County, CA Green Tree Extension Project, Victorville, CA
Bear Valley Widening over BNSF, Victorville, CA
Yucca Loma Road and Bridge Widening, Apple Valley, CA Randall Ave Widening, Rialto, CA
Road 80 Widening, County of Tulare, Tulare, CA
Avenue 416/El Monte Way, Dinuba, CA
Gas Point Road Widening, Shasta County, CA
Trinity County HBP Bridges, Trinity County, CA
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Jamie Formico
Right of Way Manager
Vanessa Cothran
Senior Right of Way Agent
Jason Andrews
Senior Right of Way Agent
Right of Way Agent
BILLING RATES* $200 $160 $160 $95
TASK 6 - RIGHT OF WAY SERVICES 160 753 775 296 1,984 $37,300 $341,900
6.1. Project Management & Coordination 20 20 $4,000
6.2. Project Tracking Table 25 25 $5,000
6.3 Permit to Enter (9 property owners/17 parcels) 25 70 70 35 200 $30,725
6.4. Order Title Reports/Title Research - 8 reports 35 35 $6,800 $10,125
6.5. Appraisals (8 Reports) 10 8 8 16 42 $21,500 $27,580
6.6 Appraisal Review Reports (8 Reports) 4 8 12 $8,000 $9,560
6.7. Summary Statements 8-EX-16 (8 Summary Statements) 4 4 32 40 $4,320
6.8. Acquisition/Negotiations (13 Parcels) 50 550 60 660 $101,700
6.9. Relocation Assistance (7 Relocations) 50 500 50 600 $1,000 $95,750
6.10. Escrow Coordination/Title Clearance 18 115 135 52 320 $48,540
6.11. Right of Way Certification/ Project Close out 8 6 8 8 30 $4,600 TOTAL HOURS 160 753 775 296 1,984
TOTAL COST $32,000 $120,480 $124,000 $28,120 $37,300 $341,900
TASK DESCRIPTION
COST PROPOSAL - HOUR BREAKDOWN
CITY OF VICTORVILLE
RIGHT OF WAY SERVICES
SANTA FE SEWER PROJECT
TOTAL
HOURS
TOTAL
COST
DOKKEN ENGINEERING
OTHER
DIRECT
COST
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Appendix B
Task 5. Drainage
• Additional design at U/S limit of proposed lining
Based on City comments, additional lining will be proposed at the U/S end of proposed channel along the westerly bank. This lining will stretch approximately 835 feet.
Work Includes:
a. Revision of the design base file for slope lining alignment, taking into account existing constraints and existing bank planimetric.
b. Revision of the design base file for slope lining profile to accommodate bank constraints and planimetric.
c. Amending plans to reflect the alignment/profile design change and adding annotations.
d. Plan processing and approval of revised design changes.
• Additional design at basin spillway
It was indicated by City during the field visit on 10/05/2023 that the existing Nutro Company basin located along the westerly bank at Station 48+00 will require due attention. Any encroachment of channel widening into the basin embankment shall be avoided while allowing safe spillover of excess flows from the basin into the channel.
Work Includes:
a. Updating base file design to reflect existing basin layout and address interference with proposed lining.
b. Adding concrete drainage apron to protect erosion of access road c. Updating plans to reflect updated linework and adding annotations d. Plan processing and approval of revised design changes.
• Additional design connecting U/S and D/S lining
City indicated on review comments that the middle portion of the proposed reach (between station ~15+00 and ~23+50) will need slope lining protection. This lining will stretch approximately 900 feet.
Work Includes:
a. Revision of the design base file for slope lining alignment, considering existing constraints, and existing bank planimetric.
b. Revision of the design base file for slope lining profile to accommodate bank constraints and planimetric.
c. Amending plans to reflect the alignment/profile design change and adding annotations.
d. Plan processing and approval of revised design changes.
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
• Additional box culverts at lateral crossings
Current design requires descending down into channel to get across tributary channels. It was indicated during the field visit on 10/05/2023 that current design limits wet weather access and is not desirable. Design needs to address wet weather maintenance access along the entire westerly bank.
Work Includes:
a. Designing RCB culverts at 3 tributary connection location b. Preparing alignment and profile for the said facilities c. Preparing plans and adding annotations and construction notes/details d. Plan processing and approval of additional tributary connections
• Including newly constructed bridge in design
It was identified during field visit that a new bridge has been constructed across the channel at the proposed reach’s downstream end. City wants to assess any impacts to grading of channel and accommodate any constraints owing to the newly constructed bridge.
Work Includes:
a. Conducting aerial topo to capture the newly constructed bridge b. Append existing topo to reflect the bridge
c. Analyze updated surface and make changes to slope protection at bridge interface d. Update plans and annotation to reflect new bridge
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Our original contract assumed WEBB would prepare a project-specific Initial Study/Mitigated Negative Declaration (IS/MND) for the sewer pipeline alignment. We assumed one round of revisions to the IS/MND per City comments. WEBB was assumed to prepare and post the Notice of Intent to Adopt the Mitigated Negative Declaration (NOI) and distribute per the City’s distribution list. The NOI will be posted with the County Clerk and filed with the State Clearinghouse. It was assumed the City would publish the NOI in the newspaper of general circulation (as designated by the City).
Following the completion of the 30-day IS/MND public review period (as required by CEQA), WEBB will draft response to the relevant CEQA comments received on the project. The Final IS/MND response to comments assumed 20 unique comments that require answers other than “comment noted.” One round of revisions to the response to comments per City review was assumed. The comments and responses will be incorporated into the Final IS/MND. The Final IS/MND shall consist of: Response to Comments, Mitigation and Monitoring Reporting Program, and the Final MND with errata and appendices to be provided in electronic format. Upon City Council approval, WEBB will prepare and file the Notice of Determination (NOD) with the State Clearinghouse. The City shall file the NOD at the County Clerk and pay the required filing fees.
Our original contract included the coordination effort required to maintain open communication with City Staff and the Project Team to ensure efficient processing of the IS/MND in conjunction with the design services until the project is approved by City Council. No attendance at public meetings was included, however, if necessary, WEBB can attend at a time and materials basis above the costs included herein.
Our original contract also included technical reports for air quality/greenhouse gas emissions, biological resources, and cultural resources.
Since contract authorization, WEBB has coordinated with the engineering team on project design, environmental constraints, and initiated some of the technical study work. It is WEBB’s understanding that the project design has changed substantially. Not only has the project footprint expanded, but the approach for the environmental analysis has also changed.
WEBB understands that the City would like the project to evaluate the sewer line alignment at a project- specific level and additional land will be evaluated at a programmatic level for ultimate improvements per the Master Drainage Plan (MDP) considering that not all future facilities have been identified yet.
The budget proposed herein incorporates the effort spent coordinating the project constraints since authorization in 2020, changes to the project footprint, and inclusion of a programmatic analysis for ultimate MDP improvements in the CEQA document in accordance with the Revised Scope of Work Exhibit prepared on May 31, 2022.
The changes in scope for the technical studies is detailed below.
Air Quality/Greenhouse Gas/Energy Analysis
o No change in scope required. The programmatic portion of the project will be identified and the CEQA document will outline future analysis and procedures (in the form of mitigation) required for ultimate MDP facilities. WEBB’s contract assumed preparation of an Air Quality/Greenhouse Gas (AQ/GHG) Analysis in accordance with the Mojave Desert Air Quality Management District (MDAQMD) requirements. The analysis would: 1) calculate emissions from construction and operation activities using the CalEEMod (Version 2020.4.0) program; 2) Prepare a regional significance threshold analysis; 3) Compare project-related emissions to MDAQMD GHG thresholds; and 4) analyze model results and incorporate mitigation measures, as appropriate, into the computer model. In order to complete the analysis, assumptions regarding construction timing and equipment will be required and are assumed to be provided by the City.
Task 10. Environmental
Appendix C
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
o The CEQA document will summarize Project-related emissions, identify potential impacts from the project, and recommend mitigation measures to reduce those impacts, as appropriate; no separate technical memorandum will be included. This scope includes minor revisions from one round of City comments.
o WEBB will also calculate the energy consumption from construction activities associated with the proposed project. Calculations will be presented in tables and included under separate cover.
Biological Resource Assessment/Jurisdictional Delineation – WEBB will team with Dudek to prepare this report.
o The previously approved scope of work assumed most of the proposed project was confined to an existing roadway. Given the expansion of the study area to include additional native habitat and additional potential jurisdictional waters, additional scope is required, as described further below.
o Dudek will prepare a biological assessment report documenting biological resources present within the project site and additional steps required for protection of those resources in accordance with federal, state, and local laws. We have assumed the project site to include the proposed realignment site, and portions of the Santa Fe Wash that would be disturbed. Aerial imagery of the new study area displays potentially suitable habitat for special-status plant species, therefore a scope and cost for this work is included. o This task will be initiated with a literature review in order to identify the potential for sensitive species that are known to occur or may potentially occur in the vicinity of the site. The literature review will include the California Department of Fish and Wildlife’s (CDFW) California Natural Diversity Data Base , U.S. Fish and Wildlife Service’s (USFWS) Environmental Conservation Online System, and California Native Plant Society’s (CNPS) Inventory of Rare and Endangered Plants . Additional information sources consulted will include Dudek’s internal geographic information system (GIS) biological resources database, and historic and current aerial photographs, as appropriate. o Following completion of the literature review, Dudek will conduct a biological survey of the project site and a 500-FT buffer (study area) in order to assess the presence or potential of occurrence for sensitive resources. Vegetation communities within the study area will be mapped on a 1:2,400-scale (1 inch=200 FT) topographic/aerial photographic map in accordance with CDFW standards. During the field surveys, a general inventory of plant and animal species detected by sight, calls, tracks, scat, or other signs will be compiled as well as a determination of potential sensitive resources that could occur within the study area. Observable sensitive resources, including perennial plants and conspicuous wildlife (i.e., birds and some reptiles), commonly accepted as regionally sensitive by the CNPS, CDFW, and USFWS, will be mapped and later digitized into a GIS format and added to the Biological Resources Map, an exhibit to be included in the final report. Additionally, a habitat assessment for potentially occurring sensitive resources that are not apparent at the time of the survey will be conducted (e.g., rare annual plants; special-status wildlife) during the field surveys. Aerial imagery of the project site displays potentially suitable habitat for burrowing owl ( Athene cunicularia ). While doubtful, should the project site demonstrate suitable habitat, focused surveys would be necessary. A scope and cost for this work is included below.
o Dudek will conduct a delineation of state and federal jurisdictional waters and wetlands within 50-FT of the proposed project study area where accessible. CDFW jurisdictional areas will be mapped to include the bank of the stream/channel and outer dripline of adjacent riparian vegetation, as set forth under Section 1602 of the California Fish and EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Game Code. Wetland waters of the United States will be mapped in accordance with current guidelines, including the USACE’s 1987 Wetlands Delineation Manual and Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region. Non-wetland waters of the United States will be delineated based on the limits of an ordinary high-water mark and the ACOE A Field Guide to the Identification of the Ordinary High-Water Mark (OHWM) in the Arid West Region of the Western United States.
Areas regulated by the RWQCB are generally coincident with the USACE but can include features isolated from navigable waters of the United States that have evidence of surface water inundation. Additionally, riparian habitat associated with the stream channel may be subject to the jurisdiction of CDFW. Dudek assumes that the project team will provide any available electronic topographic mapping prior to the site visit, o All mapping will be conducted in the field directly onto a 1:2,400-scale (1 inch=200 FT) or finer base map with the project boundary and topographic or color aerial photograph base.
Where feasible and necessary, boundaries and data station points will be delineated using a GPS unit with sub-meter accuracy and later downloaded into GIS software. Following completion of the field work, all jurisdictional polygons and line features will be digitized using ArcGIS software, and a GIS coverage will be created. Once in ArcGIS, the acreage of each jurisdictional area will be determined.
o Based on a review of aerial imagery, the proposed project contains five dry features that will need to be delineated. Dudek assumes that a OHWM form will be needed for each drainage feature, varying by feature complexity. For the purposes of this assessment and based on aerial imagery, it is assumed that the delineation can be completed concurrently with the habitat assessment and that up to 6 OHWM field forms may be required to support the delineation. Based on a review of aerial imagery, the proposed project does not appear to support riparian vegetation or potential wetlands so no Wetland Determination Forms are proposed as a part of this scope.
o The results of the jurisdictional delineation will be summarized in a stand-alone letter report that will be sufficient to meet agency permitting requirements. The report will incorporate the results of the field survey, including a discussion of the survey methodology, limitations, and results. Graphics will be prepared to illustrate the location of the site and the existing conditions of jurisdictional resources. One electronic copy of the Final Jurisdictional Delineation Letter Report incorporating one round of team comments. o Following completion of the field survey, a biological assessment report will be prepared to support the CEQA document. The report will include a discussion of the survey methodology according to the appropriate protocol and adequacy of the survey. Vegetation communities and special-status biological resources will be described in terms of their regional significance and presence on site. All biological resources observed or with potential to occur on site with any reasonable potential to constrain the project, will be addressed in the report. Also included in the report will be an assessment of existing conditions, an impacts analysis, and an assessment of the significance of impacts in accordance with CEQA and other applicable county, state, and federal laws. Dudek will recommend specific avoidance, minimization, and mitigation measures for impacts identified that will reduce impacts to a level below significance, if possible. Proposed mitigation requirements for potential impacts to sensitive or special-status resources will be discussed in terms of regional planning, and city, state, and federal laws and guidelines to comply with all existing biological resource laws, regulations, and court precedent.
Graphics will be prepared to illustrate the location of the site, the existing biological conditions, and the proposed project impacts.
One electronic copy of the Final Biological
Resources Report incorporating two round of team comments is included.
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
o As stated above, Dudek will first conduct a habitat assessment for burrowing owl. If the habitat assessment yields suitable habitat, a focused burrow survey and four focused burrowing owl surveys will be conducted in accordance with the Staff Report on Burrowing Owl Mitigation (CDFW 2012). For the burrow survey, a qualified biologist will walk uniform transects throughout the project site and a 500-FT buffer of the site (where access is authorized) and document any potential burrowing owl habitat on site (i.e., relatively open habitat with low gradients and burrow resources [i.e., burrows or manmade structures 4- inches or greater in diameter]) with a GPS unit.
o For the focused surveys, surveys will be conducted by a qualified biologist within all areas where suitable burrowing owl habitat was identified during the burrow survey. Focused surveys for burrowing owl consist of site visits on four separate days conducted during the breeding season (March 1 – August 31). If it is too late in the season to complete this survey and remain within protocol, a modified survey can be completed in order to inform the CEQA document and provide mitigation requirements. We have assumed for this scope and cost that 100% of the site will require an initial review and then only 25% of the site would support suitable burrows requiring additional follow up surveys. Due to the developed nature of the buffer and the linear aspect of the project, we assume a maximum of five miles of transects will be required. Four survey passes are expected to take eight person days. The final Burrowing Owl Report will include the methodology, results of the survey, site photographs, and a map depicting the location of all suitable burrows, burrowing owl sign, occupied burrows, and/or burrowing owls observed. o As a part of habitat assessment, Dudek will review the physical characteristics of the project areas (including biogeography, elevation, soils, etc.) and records from the California Natural Diversity Database (CNDDB) and the California Native Plant Society (CNPS) Inventory of Rare and Endangered Plants of California to compile a list of species with potential to occur on site, referred to as “target species.” This list includes special-status plants (listed species and California Rare Plant Rank [CRPR] 1 or 2 species) with potential to occur that have been recorded within the on-site U.S. Geological Survey quadrangles and the surrounding nine quadrangles.
o Dudek’s preliminary analysis identified eight target special-status species (white-bracted spineflower, desert cymopterus, Mojave monkeyflower, Booth's evening-primrose, Parish's daisy, short-joint beavertail, Beaver Dam breadroot, and Western Joshua tree). o The target species will be grouped based on their blooming period to determine which groups of plants could be observed at the same time. Botanical survey schedules vary depending on weather patterns during the prior year and will be finalized based on reference population verification, discussed below. Given the typical blooming periods of these species, it is assumed that all potential target species could be surveyed for in one pass in May.
o In reviewing the existing data, Dudek assumes that approximately 60 acres of potential habitat for special-status species will need to be surveyed. Typically, 30 acres of habitat can be surveyed by one biologist in one day. Therefore, for purposes of preparing a cost estimate, Dudek assumes that suitable habitat for special-status plant species can be surveyed in 2 person-days.
o Plant species bloom at slightly different times each year depending on temperature, rainfall patterns, elevation, and other environmental factors. Reference population checks involve locating known populations of special-status plant species during a time frame when they are known to be blooming or exhibit other phenological characteristics that allow for species identification. Observations of reference populations during peak phenology provide assurance to the lead agencies and resource agencies that these species would EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
be identifiable if they are present in areas proposed for ground disturbance. The focus of the reference plant population check will be on species that are state and federally threatened, endangered, or candidate for listing; one person-day will be allotted to this task. o Focused special-status plant surveys will conform to the CNPS Botanical Survey Guidelines (CNPS 2001); Protocols for Surveying and Evaluating Impacts to Special Status Native Plant Populations and Sensitive Natural Communities (CDFW 2018); and the U.S.
Fish and Wildlife Service’s General Rare Plant Survey Guidelines (Cypher 2002). All plant species encountered during the field surveys will be identified to subspecies or variety, if applicable, to determine sensitivity status. If target species are encountered, field personnel will record data points demarcating the edge of the polygon and assess population numbers using the Esri ArcGIS mobile application. o The final results of the focused special-status plant surveys will be prepared in a survey report and will include the methodology, results of the survey, site photographs, and a map depicting the location of any special-status species detections. One electronic version of the final Rare Plant Report (revised based upon one round of comments).
Cultural Resource Assessment – WEBB will team with Dudek to prepare this report. o This task was included in our original contract; however, the scope of work for the cultural resources inventory herein has been updated to match the current understanding.
Inventory will comply with Section 106 of the National Historic Preservation Act (NHPA) due to permit requirements including a US Army Corps of Engineers (USACE) permit.
Coordination with the Burlington Northern Santa Fe (BNSF) Railroad will not be required.
It is not anticipated Federal Rail Authority (FRA) involvement or review of the Section 106 compliance documentation. All cultural resources staff qualify under the Secretary of Interior’s professional standards for their respective subdisciplines, and methods to accomplish work exceed SOI standards.
o A cultural resources inventory to determine whether any cultural resources exist within or adjacent to the project area that may be impacted by the proposed development is required. To complete the study, an Area of Potential Effects (APE) map will be developed, a records search completed, initiation of tribal correspondence, completion of a pedestrian survey, and document the study results.
o The study will be initiated by developing an Area of Potential Effects (APE) map and description. Coordination with USACE, presumed to be the lead agency for Section 106 compliance, will be necessary to determine the APE for considering effects to historic properties (as that term is defined under Section 106). o The APE map will be utilized as the basis for initiating a records search at the South Central Coastal Information Center (SCCIC) for a one mile radius around the APE. The purpose of the records search is to identify any previously recorded cultural resources that may be located within the project area. In addition to a review of previously prepared site records and reports, the records search will also review historical maps and aerials of the project area, ethnographies, the National Register of Historic Places (NRHP), the California Register of Historical Resources (CRHR), the California Historic Property Data File, and the lists of California State Historical Landmarks, the Built Environment Resource Directory (BERD), California Points of Historical Interest, and Archaeological Determinations of Eligibility. Please note that due to COVID-19, the SCCIC has been experiencing significant delays in records search turn-around.
o Upon specific authorization by the City, Dudek will initiate correspondence with the California Native American Heritage Commission (NAHC), including one round of EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
correspondence with Native American contacts via certified mail, assumed direct costs not to exceed $200. It is assumed that the City, as the CEQA lead agency, will handle all formal tribal consultation including AB52 correspondence. Upon request, the USACE may be assisted in their Section 106 tribal consultation obligations at no extra cost, assuming no in-person meetings are required and no more than one round of correspondence with tribes for Section 106 purposes will be required.
o Following archival research and coordination, an intensive pedestrian survey of the entire APE will be conducted. It is assumed no Native American is required during the pedestrian survey and that the property will be accessible, and that no archaeological sites will be identified requiring formal recordation. Field personnel will also photograph the proximity of all built structures near to and within the APE.
For the purposes of this study Dudek
assumes that any of the structures present within the revised APE will be subject to review under a separate Built Environment Inventory Report.
o The results of this study will be documented in a report appropriately scaled to the information obtained during archival research and the pedestrian survey. Since it is assumed no resources will be identified, we assume a letter report with appropriate information, maps and appendices will suffice. Should resources be identified that require formal documentation, we will work with you to augment this scope to allow for a full technical report that includes a research context and design. Direct costs for the records search are anticipated to be no more than $1,000.
Built Environment Inventory and Evaluation Report – WEBB will team with Dudek to prepare this report.
o This task was not included in our original contract. Dudek understands that this project will require permitting from the U.S. Army Corps of Engineers (USACE) and will require a National Environmental Policy Act (NEPA) review, including permits and authorizations, which are considered federal undertakings regulated under Section 106 of the National Historic Preservation Act. As such, Dudek understands that Built Environment Inventory and Evaluation Report (technical report) will need to be prepared in accordance with Section 106 of the National Historic Preservation Act (NHPA) (Section 106), California Environmental Quality Act (CEQA), and local guidelines if applicable. The technical report will include an assessment of potential adverse effects to historic properties (if any) under Section 106 and consider potential impacts to historical resources under CEQA. In addition, consultation with the California State Historic Preservation Office (SHPO) will be required to complete the Section 106 process. Dudek’s project understanding is that the Santa Fe Sewer line will be realigned immediately west of the extant sewer line. This realignment will route the Santa Fe Sewer through several private properties, which meet the 45-year age threshold for historic resource evaluation under CEQA. We assume that coordination with the Burlington Northern Santa Fe (BNSF) Railroad will not be required, and that the proposed improvements will not encroach the right of way. We further assume that there is no Federal Rail Authority (FRA) involvement or review of the Section 106 compliance documentation. Because the proposed sewer realignment location crosses several properties which contain buildings over 45 years in age, Dudek proposes to evaluate these properties under the National Register of Historic Places (NRHP), the California Register of Historical Resources (CRHR), and local criteria for City of Victorville.
All of Dudek’s Built Environment staff qualify under the Secretary of Interior’s Professional Qualification Standards for Architectural History.
o Upon receipt of all proposed project plans, Dudek will develop the project’s Area of EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Potential Effects (APE) map for built environment resources. The APE will encompass all geographic areas in which the proposed project has the potential to directly or indirectly affect the character or use of historic properties (36 CFR 800.16[d]). In addition to areas where construction activities are expected to occur, the APE map will consider construction staging areas, temporary construction easements, utility relocation, and any other activity that has the potential to affect historic properties. The built environment APE will be limited to three parcels: 13685 Coad Road (Assessor’s Parcel Number [APN] 3090-491-04-0000, 17481 Coad Road (APN 3090-491-05-0000), and 17384 Terra Linda Drive (APN 3090- 531-01-0000). No more than three 3 versions of the APE will be produced. o Dudek Built Environment Staff will begin by reviewing the results of a California Historical Resources Information Systems records search of the project site conducted in conjunction with the archaeology tasks for this project. The purpose of the records search is to identify any previously recorded cultural resources that may be located within the project area. In addition to a review of previously prepared site records and reports, the records search will also review historical maps of the project area; ethnographies; the National Register of Historic Places; the California Register of Historical Resources; the California Historic Property Data File; and the lists of California State Historical Landmarks, California Points of Historical Interest, and Archaeological Determinations of Eligibility. o Additionally, under this task, Dudek will coordinate with local historical societies, advocacy groups/stakeholders who may have information on the subject property and its history. This coordination will include limited outreach via emails and phone calls concerning the property and its historical associations. No follow-up phone calls or in-person meetings are included in this task.
o Upon completion of the records search, Dudek will survey the project’s APE for historic built environment resources. The built environment survey will entail taking detailed notes and photographs of properties over 45 years old which intersect the proposed sewer realignment. Dudek has determined there are at least three (3) properties intersecting the proposed realignment which contain buildings that are over 45 years in age and will require recordation and evaluation for historical significance in order to determine if the proposed project has the potential to impact historical resources, as defined by CEQA and historic properties under Section 106 of the NHPA. A cursory review of San Bernardino County Assessor records and historical aerial photographs indicate that the historic-age properties which intersect the proposed sewer realignment date between 1943 and 1952. A qualified architectural historian will survey the property to document any character defining features, spatial relationships, alterations, and the overall existing conditions of the property. The survey will be restricted to the exterior of the buildings and grounds. If safe access to the properties cannot provided, survey will be limited to the public right-of-way. Should any additional resources be identified requiring recordation and evaluation because of survey results a budget augment may be required to address the resources. o Dudek assumes no more than three (3) properties in the proposed realignment area, extended environmental clearance area, and additional proposed sewer realignment areas, are over 45 years old and will require recordation and evaluation for historical significance in order to determine if the proposed project has the potential to impact historical resources, as defined by CEQA and historic properties under Section 106 of the NHPA. These properties include:
13685 Coad Road, APN 3090-491-04-0000 (constructed 1947), 17481 Coad Road, APN 3090-491-05-0000 (constructed 1943), and 17384 Terra Linda Drive, APN 3090-531-01-0000 (constructed 1952). o Each property will be recorded on State of California Department of Parks and Recreation EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Series 523 Forms (DPR forms), and will be evaluated in consideration of NRHP, CRHR, and applicable local designation criteria and integrity requirements by an architectural historian who meets the Secretary of the Interior’s Professional Qualification Standards.
As part of this task, Dudek will conduct building development research to understand the construction history of each property and retrieve information on any previous owners/occupants. Dudek will also conduct archival research to develop the appropriate historic context for the property significance evaluation. This may include contacting local libraries, archives, and relevant historical societies. Access is presently limited to many public and private facilities due to restrictions related to Covid-19. Dudek will make a good faith effort to access all relevant historic records via online procedures, email, and telephone calls if in-person access is not granted.
o Dudek will prepare a Built Environment Inventory and Evaluation Report that will summarize the results of the survey, research, and property significance evaluations. The technical report will discuss the proposed project description, regulatory framework, all sources consulted, and recommendations for appropriate management. The technical report will also analyze the proposed project’s potential to impact historic built environment resources under CEQA and historic properties under Section 106 of the NHPA. All DPR forms will be included as an appendix to the technical report. We assume no more than two drafts and one final version of the technical report will be required. Dudek assumes no more than 1, 1-hour long conference call with USACE and SHPO staff to discuss technical report findings. A separate scope and cost can be prepared upon request should development or implementation of mitigation be necessary.
Three drafts and one final
version of the technical report are included to respond to incorporate comment from the team, USACE, and SHPO.
Assumptions Used in the Preparation of the Environme ntal Scope of Services WEBB’s scope of services is based on the following assumptions:
A Mitigation Negative Declaration is the appropriate level of CEQA documentation. The topographic mapping, site plan and limit of project impacts will be provided in AutoCad or GIS shapefiles prior to kick-off of the environmental services and no major revisions will be made once the technical studies are underway.
A project description will be circulated for City review and approval prior to initiation of CEQA impact analysis.
We assumed one round of revisions to the Draft IS/MND and Final IS/MND per City comments. The City would publish the NOI in the newspaper of general circulation (as designated by the City). The City shall file the NOD at the County Clerk and pay the required filing fees. No attendance at public meetings was included,
Coordination with the Burlington Northern Santa Fe (BNSF) Railroad will not be required. It is not anticipated Federal Rail Authority (FRA) involvement or review of the Section 106 compliance documentation.
No archeological resources will require formal recordation and no more than three (3) properties over 45 years old will require recordation and evaluation for historical significance. Additional rounds of revision to each technical report identified above are excluded, The City will prepare Staff Report, Resolution and/or Findings if required.
A “round” of comments refers to a group of comments from all City departments, including the City Attorney and any other entities identified by the City at project kick-off received at the same time. (If additional rounds of comments are received, i.e., received at different times, additional comments not included in the initial round, or changes from the initial round of comments, additional budget may be required.)
EXHIBIT A, AMENDMENT 1, PROJECT BM20-076
Item Number: 24
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Jennifer Thompson, City Clerk
Subject:
Appointment to the Community Services Advisory Committee Recommendation:
That Your Honorable City Council appoint Lina Amaral to serve on the Community Services Advisory Committee, as recommended by Council Member Harriman, and re- appoint Michael Smith to continue serving the Community Services Advisory Committee as recommended by Mayor Jones.
Fiscal Impact:
There is no fiscal impact associated with this item.
Strategic Plan Goal:
Goal F: Communication and Outreach and Goal G: Organizational Effectiveness and Sustainability
Discussion:
City Council Policy and Procedures Manual Chapter 9, Section 1B, states:
“On or before December 31st of each year, the City Clerk (or such other staff as the Council may designate) shall prepare and provide to the City Council an appointments list of all regular and ongoing commissions, committees, and boards appointed by the Council and the terms of the members of such boards, committees, and commissions that will expire during the next calendar year as required by Government Code Section 54970 et seq., also known as the Maddy Act. City Council Resolution No. 13-049 identifies that the normal term of each regular committee member shall be four years, more or less, and shall be coterminous with the term of office of the nominating Councilmember. As such, in years when a City Council election takes place, all seats on commissions, committees, and 2 9
6 2
boards for newly elected Councilmembers will be open for nomination and appointment. In years when there is no City Council election, only those seats that are unfilled will be open for nomination and appointment. Such nominations must be confirmed by a majority vote of the full membership of the City Council in order for an appointment to occur. The Presiding Officer shall facilitate appointments in accordance with nomination and appointment procedure set forth in Chapter 2, points 1-6. To the extent a Councilmember’s nominee for a specific commission, committee, or board does not obtain the requisite affirmative votes, such Councilmember will be given the opportunity to nominate up to three (3) other individuals, either at the same meeting or at subsequent meetings. In the event a Councilmember’s subsequent three (3) nominees are not confirmed by a majority vote of the Council, then the City Council shall appoint a commission, committee, or board member using the same procedures set forth herein. Unscheduled vacancies shall be filled in accordance with Government Code Section 54974. Such unscheduled vacancy appointments shall be coterminous with the appointing Councilmember’s term of office as provided for in City Council Resolution No. 13-049.” At the Regular City Council meeting of December 20, 2022, the City Council completed appointments to the Planning Commission, Community Revitalization Investment Authority (CRIA) Board, Audit and Community Planning and Development (CPD) Committees. Council Member Harriman and Mayor Jones still need to make appointments to the Community Services Advisory Committee. As such, Council Member Harriman and Mayor Jones have submitted documentation for their nominees for the Community Services Advisory Committee (CSAC), so this item is being presented to the City Council for consideration. Council Member Harriman’s nominee’s resume is attached as “Attachment A”, and Mayor Jones’ nominee’s resume is attached as “Attachment B.” The Community Services Advisory Committee (CSAC) meets on the third Monday of each month at 5:00 p.m. to discuss and provide input on topics related to community programs and services, recreation activities and events, as well as park facility development. In order to further the appointment process started in December 2022, staff recommends the City Council consider the appointment submitted by Council Member Harriman and the re-appoint submitted by Mayor Jones.
Attachments: A. Resume of Lina Amaral
B. Resume of Michael Smith
ATTACHMENT A
ATTACHMENT B
Item Number: 25
City Council / Board of Directors
Written Communications
Meeting of: February 7, 2023
Submitted By:
Josefina Trevino, Human Resources Officer
Subject:
Planning Commissioner Stipend Survey
Recommendation:
Any action is at the discretion of the City Council.
Fiscal Impact:
There is no fiscal impact at this time.
Background:
At the December 20, 2022, Council Member Bob Harriman made a motion to bring forth an agenda item regarding Planning Commission stipends at the January 17, 2023, meeting. The motion was seconded by Mayor Pro Tem Becerra and passed with Council Member Gomez voting “No”.
Discussion:
Following the approval, staff requested total compensation information for Planning Commissioners from the same nine (9) cities that were surveyed for the total compensation survey completed October 5, 2021, for City Council stipends. These nine (9) cities selected for the survey have a similar population to the City of Victorville. Due to a lack of response to the initial request, staff included additional cities to provide a larger sample. A total of ten (10) Cities/Towns responded to the request, and nine (9) provide a stipend.
City/Town Stipend Frequency
City of Chino Hills $25 Per meeting (maximum of 2
meetings per month)
City of Corona $50 Per meeting
Town of Apple Valley $100 Per meeting
City of Barstow $100 Per meeting
2 9
3 4
City of Hesperia $100 Per Meeting
Town of Yucca Valley $100 Monthly
City of Big Bear $184.62 + 2.5% Retirement
Contribution
Bi-weekly
City of Montclair $250 Per meeting
City of Temecula $100 Per meeting
The City of Victorville Resolution No. 06-156, that was approved September 19, 2006, reads as follows:
•SECTION 2. The rate of compensation for each member of the Victorville Planning Commission shall be One Hundred Fifty Dollars ($150.00) for each regular meeting and Seventy-Five Dollars ($75.00) for each adjourned meeting, not to exceed Three Hundred Seventy-Five Dollars ($375.00) per month. •SECTION 3. Compensation for each member of the Victorville Planning Commission shall follow staff policy on all other reasonable expenditures incurred while in the performance of the duties of said Planning Commission.
Staff is available for any questions that you may have.
Attachments: A. Surrounding Cities Planning Commissioner Compensation B. Resolution No. 06-156
ATTACHMENT A
How Many
Current
Members
City
Population
Per Meeting
Stipend
Monthly
Stipend
City of Victorville 5 123,251 $ 150.00
Town of Apple Valley 5 76,661 $ 100.00
City of Barstow 5 23,857 $ 100.00
City of Chino Hills 5 85,081 $ 25.00
City of Hesperia 5 97,224 $ 100.00
City of Montclair 5 46,601 $ 250.00
Town of Yucca Valley 5 21,949 $ 100.00
City of Corona 5 172,652 $50.00
City of Temecula 5 115,055 $100.00
City of Highland 5 55,629
City of Big Bear Lake 5 5,295
City of Rancho Cucamonga 5 178,119 $150.00
City of Murietta 5 119,239
City of Ontario 5 193,594 $125.00
City of Adelanto 3 34,007
City of Chino 6 100,401
City of Colton 7 55,198
City of Fontana 4 217,237
City of Grand Terrace 5 12,640
City of Loma Linda 5 24,784
City of Rialto 6 104,114
City of Twentynine Palms 5 25,477
City of Yucaipa 5 54,649
City of Orange 5 137,264
2023 Planning Commissioner Stipend Survey
Conferences paid by City.
EMAILED - PENDING RESPONSE
Notes:
San Bernardino County
$75 per adjourned meeting
**Not to exceed $375.00 per month**
EMAILED - PENDING RESPONSE
$184.62 bi-weekly
EMAILED - PENDING RESPONSE
PLANNING COMMISSIONERS ARE UNPAID
OBRA (Unless a retired annuitant)
Pays for League of CA Cities Planning Commissioner Training only.
EMAILED - PENDING RESPONSE
EMAILED - PENDING RESPONSE
EMAILED - PENDING RESPONSE
PARS (Public Agency Retirement Services) Enrollment
EMAILED - PENDING RESPONSE
EMAILED - PENDING RESPONSE
EMAILED - PENDING RESPONSE
Maximum 2 meetings per month.
EMAILED - PENDING RESPONSE
Contribution to Substitute Retirement at rate of 2.5% of pay **Not to exceed $100.00 per month**