Attachment A
1 RESOLUTION NO. 23-101
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VICTORVILLE, CALIFORNIA, AMENDING THE MASTER FEE
SCHEDULE BY ADJUSTING CERTAIN USE R FEES BASE D ON THE
INCREASE ON THE CONSUMER PRICE INDEX (CPI)
WHEREAS, pursuant to the provisions of the California Constitution and the laws of the State of California, the City is authorized to adopt and impose user and regulatory fees and charges for the municipal services and activities it provides (collectively hereinafter User Fees); and WHEREAS, Article XIIIC of the California Constitution generally states that such User Fees may not exceed the reasonable costs of providing the service or performing the activity; and WHEREAS, The City must periodically review User Fees to ensure the revenues produced by said fees are sufficient to defray the cost of providing such services and do not exceed the estimated reasonable cost of providing such services; and WHEREAS, the City Council retained NBS Government Finance Group (NBS) to conduct a comprehensive analysis of user fee services and deliver findings through a User Fee Study; and WHEREAS, the City Council adopted Resolution No. 22- 055, which approved and adopted the User Fee Study, the Master Fee Schedule, and implemented an annual review of User Fees and application of the July over July comparison of the Riverside-S an Bernardino- Ontario, CA Consumer Price Index (CPI) for implementation on January 1st of each year; and WHEREAS, after the review of the CPI application, it is the recommendation to increase fees to ensure financial sustainability to foster fiscal health through cost recovery; and WHEREAS, pursuant to Government Code Sections 66016 and 66018, notice of the proposed adoption of Master User Fee Schedule was provided in the form of a notice mailed to interested parties on fourteen days prior to the hearing, and public hearing notices published on December 8 and December 15, 2023, in the Valley Wide newspaper; and WHEREAS, the proposed Master User Fee Schedule were made available for public review in the City Clerk’s office and on the City’s website on December 8, 2023; and WHEREAS, the City Council conducted a duly noticed public hearing regarding the proposed adoption of the Master User Fee Schedule at its regularly scheduled meeting on December 19, 2023, during which it heard public testimony and comment; and WHEREAS, adoption of the proposed Master User Fee Schedule is intended to improve the City’s recovery of the costs incurred to provide individual services, and represents the costs reasonably borne by the City in providing direct services to particular individuals or groups rather than to the general populace of the City; and 2 WHEREAS, the fees set forth in for adoption in the proposed Master User Fee Schedule represent the reasonable costs incurred by the City in providing the listed services and activities and therefore do not exceed the City’s cost of providing the same.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF VICTORVILLE DOES HEREBY RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS.
Section 1. The recitals set forth above are true and correct and are incorporated i nto this Resolution by this reference together with any definitions and findings set forth therein.
Section 2. The City Council has reviewed and hereby approves and adopts the Master User Fee Schedule attached hereto as Exhibit A and by this reference incorporated h erein, reflecting adjustments to certain user fees based on the July 2023 over July 2022 CPI, as well as other adjustments that serve to eliminate, reduce and/or modify certain user fees.
Section 3. The City Council hereby finds and determines that the adjusted user fees established herein do not exceed the estimated reasonable cost of providing the services and activities to which the fees are levied.
Section 4. T he City Council finds that the setting or revising of fees pu rsuant to this Resolution is exempt from environmental review under the California Environmental Quality Act (“CEQA”), pursuant to Public Resources Code Section 21080(b)(8) and Section 15272 of the CEQA Guidelines, which provide an exemption for the establishment or modification of charges by public agencies that the public agency finds are for the purpose of meeting operating expenses. Based on the record as a whole, the establishment or modification o f fees or other charges pursuant to this Resolution is entirely for the purpose of meeting operating expenses in that none of the recommended fees or fee increase would recover more than one hundred percent of the cost incurred by the City to deliver the service provided
Section 5. This Resolution shall take effect immediately upon its adoption. However, the User Fees set forth in the Master User Fee Schedule in the attached Exhibit A shall not be in force or effective until January 1, 2024.
Section 6. The City Clerk shall certify to the passage an adoption of this Resolution; shall enter the same in the book of original resolutions; and shall make a minute of passage and adoption thereof in the records of the proceedings, in the minutes of the meeting at which this Resolution is passed and adopted.
Resolution No. VWD 23-016
1 RES
OLUTION NO. VWD- 23-016
A RES
OLUTION OF THE BOARD OF DIRECTORS OF THE
VICTORVILLE WATER DISTRICT AMENDING THE MASTER FEE
SCHEDULE BY ADJUSTING CERTAIN WATER DISTRICT RELATED
USER FEES BASED ON THE INCREASE IN THE CONSUMER PRICE
INDEX (CPI)
WHEREAS, the V ictorville Water District (the District), is a c ounty water district and subsidiary district of the City of Victorville (the City or Victorville); and WHEREAS, the District constru cts, owns, operates, improves, and maintains th e water system and related facilities and infrastructure that serves the District's existing customers and provides water service availability to new customers and new developments within the jurisdictional boundaries of the District; and
WHEREAS, pursuant to the provisions of the California Constitution, and the laws of the State of California, the District is authorized to adopt and impose user and regulatory fees and charges for the water-related services it provides (collectively hereinafter User Fees); and WHEREAS, Article XIIIC of the California Constitution generally states that such User Fees may not exceed the reasonable costs of providing the services; and WHEREAS, the District Board of Directors (District Board) has previously established various User Fees for water related services provided by the District within the jurisdictional boundaries of the District; and
WHEREAS, the District must periodically review User Fees to ensure the revenues produced by said fees are sufficient to defray the cost of providing such services and do not exceed the estimated reasonable cost of providing such services; and WHEREAS, together with the Victorville City Council, the District Board retained NBS Government Finance Group (NBS) to conduct a comprehensive analysis of user fee services and deliver findings through a User Fee Study
WHEREAS, the District Board adopted Resolution No. VWD 22-008, which approved and adopted district related fees through the comprehensive User Fee Study, the Master Fee Schedule, and implemented an annual review of User Fees and application of the July over July comparison of the Riverside-San Bernardino-Ontario, CA Consumer Price Index (CPI) for implementation on January 1st of each year; and
WHEREAS, after the review of the CPI application, it is the recommendation to increase fees to ensure financial sustainability to foster fiscal health through cost recovery; and WHEREAS, pursuant to Government Code Sections 66016 and 66018, notice of the proposed adoption of Master User Fee Schedule was provided in the form of a notice mailed to 2 interested parties on fourteen days prior to the hearing, and public hearing notices published on December 8 and December 15, 2023, in the Valley Wide newspaper; and WHEREAS, the proposed Master User Fee Schedule was made available for public review in the City Clerk/District Secretary’s office and on the City/District’s website on December 8, 2023; and
WHEREAS, the District Board conducted a duly noticed public hearing regarding the proposed adoption of the Master User Fee Schedule with respect to the Water District related fee portions thereof at its regularly scheduled meeting on December 19, 2023, during which it heard public testimony and comment; and
WHEREAS, adoption of the Water District related fee portions of the proposed Master User Fee Schedule is intended to improve the District’s recovery of the costs incurred to provide individual services, and represents the costs reasonably borne by the District in providing direct services to particular individuals or groups rather than to the general populace of those in the District’s jurisdictional boundaries; and
WHEREAS, Water District related fees proposed to be adopted as contained in Master User Fee Schedule represent the reasonable costs incurred by the District in providing the Water District related listed services and activities and therefore do not exceed the Dis trict’s cost of providing the same.
NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE VICTORVILLE
WATER DISTRICT DOES HEREBY RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS.
Section 1. The recitals s et forth above are true and correct and are incorporated i nto this Resolution by this reference together with any definitions and findings set forth therein.
Section 2. The District Board has reviewed and hereby approves and adopts the Master User Fee Schedule attached hereto as Exhibit A, and by this reference incorporated herein, reflecting adjustments to certain user fees based on the July 2023 over July 2022 CPI, as well as other adjustments that serve to eliminate, reduce and/or modify certain user fees.
Section 3. The District Board hereby finds and determines that the adjusted district related user fess established herein do not exceed the estimated reasonable cost of providing the listed services and activities to which the fees are levied.
Section 4. T he District Board finds that the setting or revising o f fees pursuant to this Resolution is exempt from environmental review under the California Environmental Quality Act (“CEQA”), pursuant to Public Resources Code Section 21080(b)(8) and Section 15272 of the CEQA Guidelines, which provide an exemption for the establishment or modification of charges by public agencies that the public agency finds are for the purpose of meeting operating expenses. Based on the record as a whole, the establishm ent or modification of fees or oth er charges pursu ant to this Resolution is entirely for the purpose of meeting operating expenses in that none of the recommended fees or fee increase would recover more than one hundred percent of the cost incurred by the District to deliver the service provided
3 Section 5. This Resolution shall take effect immediately upon its adoption. However, the Water related User Fees set forth in the Master User Fee Schedule in the attached Exhibit A shall not be in force or effective until January 1, 2024.
Section 6. The D istrict Secretary shall certify to the passage an adoption of this Resolution; shall enter the same in the book of original resolutions; and shall make a minute of passage and adoption thereof in the records of the proceedings, in the minutes of the m eeting at which this Resolution is passed and adopted.
Exhibit A
Master User Fee Schedule
CITY OF VICTORVILLE
MASTER FEE SCHEDULE
DRAFT : December 8, 2023
Department Page #
Planning …............................................... 3-4 Land Development & Engineering …............................................... 5-17 Building - Scaled Plan Check Fees …............................................... 18-21 Building - Scaled Inspection Fees …............................................... 22-25 Building - Miscellaneous Fee Items …............................................... 26-28 Building - Mechanical, Plumbing, Electrical …............................................... 29 Fire Prevention …............................................... 30-36 Police …............................................... 37 Business License …............................................... 38-39 Code Enforcement …............................................... 40-41 Animal Control …............................................... 42-44 Economic Development …............................................... 45 Public Works - Parks …............................................... 46 VMUS …............................................... 47-48 Water - Customer Service …............................................... 49 Water - Utility Permits …............................................... 50-51 City Clerk and Miscellaneous Administrative Fees …............................................... 52 Library …............................................... 53 Recreation …............................................... 54-57 Table of Contents
City of Victorville
Master Fee Schedule
DRAFT
Table of Contents
Planning
I Planning Commission Application Types and Fees
1 Conditional Use Permit/Application flat $ 2,523 2,606$ 2 Development Agreement
Base Fee base $ 3,920 4,049$
Revision flat $ 1,914 1,977$
3 Environmental Assessment
Categorical Exemption flat $ 173 179$ Initial Study/Negative Declaration - Minor flat [5] $ 1,276 1,318$ Initial Study/Negative Declaration - City Staff Review of Contractor flat [1] $ 3,054 3,154$ Environmental Impact Report [2]
City Staff Review flat $ 5,948 6,144$
Contractor Actual Cost Actual Cost Actual Cost
4 General Plan Amendment flat $ 3,372 3,483$ 5 Home Occupation Permit flat $ 1,231 1,271$ 6 Interim Use Permit flat $ 2,233 2,306$ 7 Planned Unit Development/Modification [6]
Parcel (4 lots or less) flat $ 3,844 3,970$ 5 - 25 lots flat $ 4,771 4,928$
26 - 100 lots flat $ 5,697 5,885$
>100 lots, per each additional 100 lots flat $ 4,938 5,100$ 8 Site Plan/Modification flat $ 2,523 2,606$ 9 Specific Plan flat $ 9,224 9,527$
10 Specific Plan Amendment flat $ 2,233 2,307$ 11 Tentative Parcel Map/Mod./Amend and Vesting Tentative Parcel Map Parcel (4 lots or less) flat $ 5,926 6,121$ 5 - 25 lots flat $ 6,615 6,833$
26 - 100 lots flat $ 7,304 7,545$
>100 lots, per each additional 100 lots flat $ 6,986 7,215$ 12 Variance flat $ 2,347 2,424$
13 Zone Change/Code Amendment flat $ 3,327 3,437$ II Zoning Administrator Application Types and Fees
14 Certificate of Compliance flat $ 1,972 2,037$ 15 Environmental Assessment
Categorical Exemption flat $ 173 179$ Initial Study/Negative Declaration - Minor flat [5]
Initial Study/Negative Declaration - City Staff Review of Contractor flat [1] $ 3,054 3,154$ 16 Finding of Public Convenience or Necessity flat $ 273 282$ 17 Minor Interim Use Permit flat $ 820 847$ 18 Lot Line Adjustment flat $ 410 424$ 19 Lot Merger flat $ 410 423$
20 Master Sign Program flat $ 547 565$ 21 Minor Conditional Use Permit flat $ 1,111 1,148$ 22 Minor Site Plan flat $ 865 894$
23 Minor Site Plan - Tract per floor plan $ 365 377$ 24 Minor Variance flat $ 1,617 1,670$
25 Model Home Complex flat $ 684 706$ Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
City of Victorville
Master Fee Schedule
DRAFT
Planning, Page 3 of 58
Planning
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
26 Minor Deviation
Fence height adjustment flat $ 593 612$ Lot coverage flat $ 593 612$
Parking space reduction flat $ 593 612$ Stock Plan Change flat $ 593 612$
Yard dimension flat $ 593 612$
27 Pet Permit flat $ 182 188$
28 Storage Container(s) flat $ 91 94$ 29 Tentative Tract/Parcel Map Mod flat $ 865 894$ 30 Wireless Communication Facility (WCF)
Co-location on existing (WCF) flat $ 1,111 1,148$ New location flat $ 1,977 2,042$
III Special Studies and Deposit Fees see engineering
fee schedule
see
engineering fee
schedule
IV Temporary Uses
31 Temporary Use Permit (Planning Review Only) flat $ 91 94$ 32 Temporary Sign Permit flat $ 46 47$ 33 Special Use Permit (for Special Events) [3]
Initial Application Review flat $ 365 377$ Actual Event Support per event Actual Cost Actual Cost V Appeals
34 Appeal to Planning Commission per appeal $ 729 753$ 35 Appeal to City Council per appeal $ 1,823 1,883$ VI Yard Sale
36 Yard/Garage Sale flat $ - -$ VII Miscellaneous
37 Zoning Verification Letter flat $ 91 94$ 38 Initial Noticing - Mailing Costs Actual Cost Actual Cost Actual Cost 39 Re-Noticing - Staff Time and Mailing Costs Actual Cost $ 91 94$ 40 Pre-submittal Review flat [4] No Charge No Charge
41 General Plan Surcharge [7] 20.3% 21.0%
[Notes]
[1] Costs of contract services provider apply separately [2] City staff time/cost and costs of contract services provider will be billed to applicant as needed [3]
[4]
[5] Minor means does not require technical studies.
[6] Lot counts exclude remainder lots and lots intended for public purposes. [7] Applies to Building permits involving new construction, additions only Fee will be collected at time of application submittal for Planning Commission review. Costs/fees for other department review may apply separately
Other department fees apply as needed for initial application review; costs for actual event support charged as needed on an actual cost basis
City of Victorville
Master Fee Schedule
DRAFT
Planning, Page 4 of 58
Land Development & Engineering
I Issuance, Permitting, & Inspection
1 Pre-Inspection/Right-of-Way Investigation each [1] 75$ 78$ 2 ROW Permit Issuance each 201$ 208$
3 Re-Inspection each 163$ 168$
4 Violation/Non-Compliance each [3]
Refer to
Victorville
Municipal Code
Chapters 1.04
and 1.05
Refer to
Victorville
Municipal Code
Chapters 1.04
and 1.05
5 Inspections Outside Normal Hours
Overtime - 4-hours min hourly 116$ 120$ II Concrete Inspections [2]
6 Residential Drive Approach each 301$ 311$ 7 Commercial/Industrial Drive Approach each 502$ 519$ 8 Sidewalk
0-100LF base 251$ 259$
additional charge per 100LF each 50$ 52$ 9 Curb & Gutter
0-100LF base 251$ 259$
additional charge per 100LF each 50$ 52$ III Drainage Inspections [2]
10 Catch Basin
1 - 4 Basins base 352$ 363$
each additional 4 Basins each 100$ 104$ 11 Curb Core/Under Sidewalk Drain
1 - 5 Basins base 201$ 208$
each additional 5 Basins each 100$ 104$ 12 Alley/Ribbon Gutter
0-100LF base 201$ 208$
additional charge per 100LF each 50$ 52$ 13 SWPPP
City Staff Review each 1,306$ 1,349$
Consultant Cost each Actual Cost Actual Cost
14 WQMP / NPDES
Subdivision Review
City Staff Review each 1,306$ 1,349$
Consultant Cost each Actual Cost Actual Cost
Multi/Commercial/Industrial Review
City Staff Review each 1,306$ 1,349$
Consultant Cost each Actual Cost Actual Cost
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 5 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 6 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
15 MS4 Inspections [2]
Minor Construction 2.5AC or Less & In-Fill Lots each 553$ 571$ Commercial/Industrial/Multi or Projects Greater than 2.5AC each 854$ 882$ Subdivisions each 5,326$ 5,501$
IV Trench & Pavement Inspections [2]
16 Open Trench Excavation
0-100LF base 301$ 311$
additional charge per 100LF each 100$ 104$ 17 Bore [2]
0-100LF base 301$ 311$
additional charge per 100LF each 100$ 104$ 18 Bell Holes/Bore Holes/Pot Holes/Slice Pits [2]
0-8 EA base 109$ 112$
9-16 EA base 109$ 112$
additional charge for each each 0.34$ 0.35$ 17 EA+ base 109$ 112$
additional charge for each each 0.34$ 0.35$ 19 Pavement Cuts [2]
0-300LF base 201$ 208$
additional charge per LF each 100$ 104$ 20 Paving
0-100 SQFT base 301$ 311$
additional charge per 100 SQFT each 151$ 156$ V Final Map Review Fees
21 Tentative Parcel Map/Mod./Amend flat
See Planning
Fee Schedule
See Planning
Fee Schedule
Parcel (4 lots or less) flat 3,266 3,373$ 5 - 25 lots flat 5,778 5,968$
26 - 100 lots flat 9,797 10,119$
>100 lots, per each additional 100 lots flat 16,077 16,606$ City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 7 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
VI Public Improvement - Plan Check [2]
22 Commercial/Residential Subdivision
$ 50,000 base fee up to $50,000 955$ 986$
$ 50,001 base fee at $50,001 2,864$ 2,958$
each add'l
$10,000 or
fraction thereof
195.94$ 202.39$
$ 250,000 base fee at $250,000 6,783$ 7,006$
each add'l
$10,000 or
fraction thereof
150.72$ 155.68$
$ 500,000 base fee at $500,000 10,551$ 10,898$
each add'l
$10,000 or
fraction thereof
160.77$ 166.06$
$ 1,000,000 base fee at $1,000,000 18,589$ 19,201$
each add'l
$10,000 or
fraction thereof
16.33$ 16.87$
$ 5,000,000 base fee at $5,000,000
[8] 25,121$ 25,947$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 8 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
23 Construction Excavation (Single/In-Fill)
$ 50,000 base fee up to $50,000 1,005$ 1,038$
$ 50,001 base fee at $50,001 4,019$ 4,152$
each add'l
$10,000 or
fraction thereof
238.65$ 246.50$
$ 250,000 base fee at $250,000 8,792$ 9,082$
each add'l
$10,000 or
fraction thereof
321.54$ 332.12$
$ 500,000 base fee at $500,000 16,831$ 17,385$
each add'l
$10,000 or
fraction thereof
165.80$ 171.25$
$ 1,000,000 base fee at $1,000,000 25,121$ 25,947$
each add'l
$10,000 or
fraction thereof
97.34$ 100.55$
$ 5,000,000 base fee at $5,000,000
[8] 64,058$ 66,165$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 9 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
24 Water Improvements
$ 50,000 base fee up to $50,000 955$ 986$
$ 50,001 base fee at $50,001 2,864$ 2,958$
each add'l
$10,000 or
fraction thereof
195.94$ 202.39$
$ 250,000 base fee at $250,000 6,783$ 7,006$
each add'l
$10,000 or
fraction thereof
190.92$ 197.20$
$ 500,000 base fee at $500,000 11,556$ 11,936$
each add'l
$10,000 or
fraction thereof
211.01$ 217.96$
$ 1,000,000 base fee at $1,000,000 22,106$ 22,834$
each add'l
$10,000 or
fraction thereof
20.10$ 20.76$
$ 5,000,000 base fee at $5,000,000
[8] 30,145$ 31,137$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 10 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
25 Sewer Improvements
$ 50,000 base fee up to $50,000 955$ 986$
$ 50,001 base fee at $50,001 2,864$ 2,958$
each add'l
$10,000 or
fraction thereof
195.94$ 202.39$
$ 250,000 base fee at $250,000 6,783$ 7,006$
each add'l
$10,000 or
fraction thereof
190.92$ 197.20$
$ 500,000 base fee at $500,000 11,556$ 11,936$
each add'l
$10,000 or
fraction thereof
211.01$ 217.96$
$ 1,000,000 base fee at $1,000,000 22,106$ 22,834$
each add'l
$10,000 or
fraction thereof
20.10$ 20.76$
$ 5,000,000 base fee at $5,000,000
[8] 30,145$ 31,137$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 11 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
VII Public Improvement - Inspection
26 Commercial/Residential Subdivision
$ 50,000 base fee up to $50,000 1,005$ 1,038$
$ 50,001 base fee at $50,001 4,019$ 4,152$
each add'l
$10,000 or
fraction thereof
238.65$ 246.50$
$ 250,000 base fee at $250,000 8,792$ 9,082$
each add'l
$10,000 or
fraction thereof
321.54$ 332.12$
$ 500,000 base fee at $500,000 16,831$ 17,385$
each add'l
$10,000 or
fraction thereof
944.54$ 975.61$
$ 1,000,000 base fee at $1,000,000 64,058$ 66,165$
each add'l
$10,000 or
fraction thereof
103.62$ 107.03$
$ 5,000,000 base fee at $5,000,000
[8] 105,507$ 108,978$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 12 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
27 Construction Excavation (Single/In-Fill)
$ 50,000 base fee up to $50,000 1,005$ 1,038$
$ 50,001 base fee at $50,001 4,019$ 4,152$
each add'l
$10,000 or
fraction thereof
238.65$ 246.50$
$ 250,000 base fee at $250,000 8,792$ 9,082$
each add'l
$10,000 or
fraction thereof
321.54$ 332.12$
$ 500,000 base fee at $500,000 16,831$ 17,385$
each add'l
$10,000 or
fraction thereof
944.54$ 975.61$
$ 1,000,000 base fee at $1,000,000 64,058$ 66,165$
each add'l
$10,000 or
fraction thereof
103.62$ 107.03$
$ 5,000,000 base fee at $5,000,000
[8] 105,507$ 108,978$
28 Traffic Signal/Signage&Striping
First Signal each 226$ 234$
Each add'l Signal Under the Same Project each 151$ 156$ City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 13 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
29 Water Improvements
$ 50,000 base fee up to $50,000 1,005$ 1,038$
$ 50,001 base fee at $50,001 4,019$ 4,152$
each add'l
$10,000 or
fraction thereof
238.65$ 246.50$
$ 250,000 base fee at $250,000 8,792$ 9,082$
each add'l
$10,000 or
fraction thereof
321.54$ 332.12$
$ 500,000 base fee at $500,000 16,831$ 17,385$
each add'l
$10,000 or
fraction thereof
944.54$ 975.61$
$ 1,000,000 base fee at $1,000,000 64,058$ 66,165$
each add'l
$10,000 or
fraction thereof
103.62$ 107.03$
$ 5,000,000 base fee at $5,000,000
[8] 105,507$ 108,978$
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 14 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
30 Sewer Improvements
$ 50,000 base fee up to $50,000 1,005$ 1,038$
$ 50,001 base fee at $50,001 4,019$ 4,152$
each add'l
$10,000 or
fraction thereof
238.65$ 246.50$
$ 250,000 base fee at $250,000 8,792$ 9,082$
each add'l
$10,000 or
fraction thereof
321.54$ 332.12$
$ 500,000 base fee at $500,000 16,831$ 17,385$
each add'l
$10,000 or
fraction thereof
944.54$ 975.61$
$ 1,000,000 base fee at $1,000,000 64,058$ 66,165$
each add'l
$10,000 or
fraction thereof
103.62$ 107.03$
$ 5,000,000 base fee at $5,000,000
[8] 105,507$ 108,978$
31 Traffic Control
Plan Check each 100$ 104$
Inspection/Monitoring daily 75$ 78$ 32 Subdivision Street Signage
A. Sign Installation
1. 36" Stop Sign, 1-Base, 1-Pole & 2-Street Name Signs with labor per location 201$ 208$
2. 30" Stop Sign, 1-Base, 1-Pole & 2-Street Name Signs with labor per location 201$ 208$
3. 1-Base, 1-Pole & 2- Street Name Signs with labor per location 201$ 208$ B. Street Signage Individual Pricing
1. Street Name Sign each Actual Cost Actual Cost
2. Pole each Actual Cost Actual Cost
3. Base Anchor each Actual Cost Actual Cost
4. Stop Sign (R1) 30" each Actual Cost Actual Cost
5. Stop Sign (R1) 36" each Actual Cost Actual Cost
6. Labor Installation & Fabrication per location Actual Cost Actual Cost
7. Sign Truck each Actual Cost Actual Cost
8. Sign Cap & Cross each Actual Cost Actual Cost
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 15 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
33 Monumentation & Centerline Ties [2]
0-100 Lots base 402$ 415$
101 - 200 Lots base 603$ 623$
201+ Lots base 804$ 830$
34 Security Release/Substitution each 243$ 251$ VIII Reports, Studies & Document Review
35 Hydrology Study
Preliminary
City Staff Review each 1,005$ 1,038$
Consultant Cost each Actual Cost Actual Cost
Final
City Staff Review each 2,638$ 2,724$
Consultant Cost each Actual Cost Actual Cost
36 WQMP
Preliminary
City Staff Review each 2,261$ 2,335$
Consultant Cost each Actual Cost Actual Cost
Final
City Staff Review each 653$ 675$
Consultant Cost each Actual Cost Actual Cost
37 Sewer Study
City Staff Review each 1,156$ 1,194$
Consultant Cost each Actual Cost Actual Cost
38 Preliminary Traffic Study
City Staff Review each 2,512$ 2,595$
Consultant Cost each Actual Cost Actual Cost
39 Water Feasibility Study
City Staff Review each 1,156$ 1,194$
Consultant Cost each Actual Cost Actual Cost
40 Water Supply Assessment
City Staff Review each 2,512$ 2,595$
Consultant Cost each Actual Cost Actual Cost
41 Research
First 2 hours base
See Finance Fee
Schedule for
Public Records
Request
See Finance Fee
Schedule for
Public Records
Request
After 2 hours hourly 100$ 104$
Reproduction Costs each Actual Cost Actual Cost
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 16 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
42 Vacations, Right-of-Way, Easements, or Dedications
Processing Fee each 352$ 363$
Recording each Per County Per County
Checking Minor each 243$ 251$
Checking Major (Metes and Bounds) each 402$ 415$ Prepared by City
Minor each 209$ 216$
Major each 904$ 934$
43 Agreements
Subdivision, Development, & Utility Surety Agreement each [4] 301$ 311$ Set UUA, UUSA & LDIC each -$ -$
Subdivision Extension of Time each -$ -$ 44 Assessment District Formation each Actual Cost Actual Cost 45 Lien Agreement Processing Fee each [4] 352$ 363$ 46 Lien Agreement Reversion to Acreage Deposit deposit per tract map
[4] 352$ 363$
47 Lien Agreement Maintenance/Dust Mitigation Deposit deposit per lot [4] 352$ 363$ 48 Release, or Partial Release of Recorded Agreements each [4] 201$ 208$ 49 Reimbursement Agreements each [4] 603$ 623$ 50 Agreement Re-Assignment each [4] 502$ 519$ 51 Variance each see planning
fee schedule
see planning
fee schedule
IX (Permit) Engineering - Utility Cuts Inspection Fee
52 Utility Cuts [2]
0-300LF base 201$ 208$
additional charge for each add'l 300 LF each 100$ 104$ 53 Utility Trench/Bore [2]
0-300LF base 201$ 208$
additional charge for each add'l 300 LF each 100$ 104$ 54 Utility Structures [2]
0-8 EA base 145$ 150$
9-16 EA base 145$ 150$
additional charge for each each 6$ 6$ 17 EA+ base 145$ 150$
additional charge for each each 6$ 6$ 55 Undergrounding Utilities [2]
0-300LF base 201$ 208$
additional charge for each add'l 300LF each 100$ 104$ City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 17 of 58
Land Development & Engineering
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
X Specialty & Miscellaneous Permitting & Inspections
56 Parade each [5] $ 393 406$
57 Special Use Permit each [5] See Planning
Fee schedule
See Planning
Fee schedule
58 Filming each [6] $ 393 406$
XI Transportation & Permitting
59 Transportation Issuance each [9] Set by State Set by State 60 Recreational Vehicle each [9] Set by State Set by State 61 Oversize Load - Purple each [9] Set by State Set by State 62 Single - Oversize Load (Green) per trip [9] Set by State Set by State 63 Repetitive - Oversize Load (Green) each [9] Set by State Set by State 64 Moving each [7] Actual Cost Actual Cost
Notes
[1] Credit for fee amount will be applied toward permit issuance. [2] ROW Permit Issuance Fee applies separately; as well as charge based on accumulative Linear Feet (LF). [3] Fine/Penalty
[4] Attorney fees are charged in addition to the fee listed. [5] Costs Reasonably Borne and Insurance Required as Determined by Risk Management are charged in addition to the fee listed. [7] Costs Reasonably Borne, Surety, and Insurance Requirements as Determined by Risk Management are charged. [8] Projects significantly in excess of $5MM will be evaluated by the Engineer; potential deposit may be required. [9] Set by State
[6] Costs Reasonably Borne, Insurance Required as Determined by Risk Management, Film Business License, and San Bernardino County Fire Dept. Permit fees are charged in addition to the fee listed.
City of Victorville
Master Fee Schedule
DRAFT
Land Dev and Engineering , Page 18 of 58
Building - Scaled Plan Check Fees
BUILDING PLAN CHECK
1 500 base fee up to
500 s.f. $ 2,069 2,137$
each add'l s.f. $ 0.13 0.13$
5,000 base fee up to
5,000 s.f. $ 2,646 2,733$
each add'l s.f. $ 0.12 0.13$
10,000 base fee up to
10,000 s.f. $ 3,256 3,363$
each add'l s.f. 0.02$ 0.02$
50,000 base fee up to
50,000 s.f. $ 4,138 4,274$
each add'l s.f. 0.02$ 0.02$
100,000 base fee up to
100,000 s.f. 5,054$ 5,220$
each add'l s.f. 0.002$ 0.002$
500,000 base fee up to
500,000 s.f. 5,935.79$ 6,131$
each add'l s.f. 0.002$ 0.002$
1,000,000 base fee up to
1,000,000 s.f. 6,851.60$ 7,077$
each add'l s.f. 0.01$ 0.01$
2 500 base fee up to
500 s.f. $ 1,323 1,366$
each add'l s.f. 0.39$ 0.40$
2,500 base fee up to
2,500 s.f. 2,102.97$ 2,172$
each add'l s.f. 0.35$ 0.36$
5,000 base fee up to
5,000 s.f. 2,984.85$ 3,083$
each add'l s.f. 0.18$ 0.18$
10,000 base fee up to
10,000 s.f. 3,866.74$ 3,994$
each add'l s.f. 0.02$ 0.02$
50,000 base fee up to
50,000 s.f. 4,748.63$ 4,905$
each add'l s.f. 0.01$ 0.02$
100,000 base fee up to
100,000 s.f. 5,494.84$ 5,676$
each add'l s.f. 0.05$ 0.06$
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
I. NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS
Commercial/Industrial Uses - (All newly constructed or added space for non-residential occupancies classified as commercial or industrial that are not specifically addressed elsewhere in this Fee Schedule)
Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled PC, Page 19 of 58
Building - Scaled Plan Check Fees
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
3 200 base fee up to
200 s.f. $ 271 280$
each add'l s.f. -$ -$
400 base fee up to
400 s.f. 271$ 280$
each add'l s.f. 0.68$ 0.70$
600 base fee up to
600 s.f. 407$ 420$
each add'l s.f. 0.34$ 0.35$
1,000 base fee up to
1,000 s.f. 543$ 561$
each add'l s.f. 0.07$ 0.07$
3,000 base fee up to
3,000 s.f. 678$ 701$
each add'l s.f. 0.23$ 0.23$
4 500 base fee up to
500 s.f. 1,730$ 1,787$
each add'l s.f. 0.10$ 0.10$
5,000 base fee up to
5,000 s.f. 2,171$ 2,242$
each add'l s.f. 0.09$ 0.09$
10,000 base fee up to
10,000 s.f. 2,612$ 2,698$
each add'l s.f. 0.02$ 0.02$
50,000 base fee up to
50,000 s.f. 3,358$ 3,468$
each add'l s.f. 0.01$ 0.02$
100,000 base fee up to
100,000 s.f. 4,104$ 4,239$
each add'l s.f. 0.002$ 0.002$
500,000 base fee up to
500,000 s.f. 4,715$ 4,870$
each add'l s.f. 0.001$ 0.002$
1,000,000 base fee up to
1,000,000 s.f. 5,461$ 5,641$
each add'l s.f. 0.01$ 0.01$
Accessory and Utility Uses - (All newly constructed, added or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) Shell Buildings for all Commercial/Industrial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as commercial or industrial that are not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)
City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled PC, Page 20 of 58
Building - Scaled Plan Check Fees
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
5 500 base fee up to
500 s.f. 984$ 1,016$
each add'l s.f. 0.12$ 0.12$
5,000 base fee up to
5,000 s.f. 1,526$ 1,577$
each add'l s.f. 0.09$ 0.10$
10,000 base fee up to
10,000 s.f. 2,001$ 2,067$
each add'l s.f. 0.01$ 0.01$
50,000 base fee up to
50,000 s.f. 2,510$ 2,593$
each add'l s.f. 0.01$ 0.01$
100,000 base fee up to
100,000 s.f. 3,188$ 3,293$
each add'l s.f. 0.03$ 0.03$
6 500 base fee up to
500 s.f. $ 984 1,016$
each add'l s.f. 0.17$ 0.18$
2,500 base fee up to
2,500 s.f. 1,323$ 1,366$
each add'l s.f. 0.08$ 0.08$
5,000 base fee up to
5,000 s.f. 1,526$ 1,577$
each add'l s.f. 0.09$ 0.10$
10,000 base fee up to
10,000 s.f. 2,001$ 2,067$
each add'l s.f. 0.01$ 0.01$
50,000 base fee up to
50,000 s.f. 2,510$ 2,593$
each add'l s.f. 0.01$ 0.01$
100,000 base fee up to
100,000 s.f. 3,188$ 3,293$
each add'l s.f. 0.03$ 0.03$
7 Master Plotting Plan Review
Parcel (4 lots or less) each $ 271 280$ 5 - 25 lots each $ 543 561$
26 - 100 lots each $ 814 841$
>100 lots, per each additional 100 lots each $ 271 280$ Commercial Residential and Multifamily Residential Remodels - (All modifications or improvements to existing square footage for residential occupancies classified as CBC Group R (except R-3))
Commercial/Industrial Tenant Improvement -(All modifications or improvements to existing square footage for occupancies classified as CBC commercial types) City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled PC, Page 21 of 58
Building - Scaled Plan Check Fees
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
8 500 base fee up to
500 s.f. 678$ 701$
each add'l s.f. 0.17$ 0.18$
2,500 base fee up to
2,500 s.f. 1,018$ 1,051$
each add'l s.f. 0.08$ 0.08$
5,000 base fee up to
4,000 s.f. 1,221$ 1,261$
each add'l s.f. 0.24$ 0.25$
9 500 base fee up to
1,000 s.f. 475$ 490$
each add'l s.f. 0.07$ 0.07$
2,500 base fee up to
2,500 s.f. 617$ 638$
each add'l s.f. 0.06$ 0.06$
5,000 base fee up to
4,000 s.f. 760$ 785$
each add'l s.f. 0.15$ 0.16$
Single Family Dwellings and Duplexes - (All newly constructed or added space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
Duplicate Floor Plan Review - Single Family Dwellings and Duplexes City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled PC, Page 22 of 58
Building - Scaled Inspection Fees
BUILDING PERMIT/INSPECTION
1 500 base fee up to
500 s.f. $ 2,035 2,102$
each add'l s.f. $ 0.33 0.34$
5,000 base fee up to
5,000 s.f. $ 3,528 3,644$
each add'l s.f. $ 0.11 0.11$
10,000 base fee up to
10,000 s.f. $ 4,070 4,204$
each add'l s.f. 0.04$ 0.04$
50,000 base fee up to
50,000 s.f. $ 5,698 5,886$
each add'l s.f. 0.04$ 0.04$
100,000 base fee up to
100,000 s.f. 7,598$ 7,848$
each add'l s.f. 0.005$ 0.005$
500,000 base fee up to
500,000 s.f. 9,497$ 9,810$
each add'l s.f. 0.01$ 0.01$
1,000,000 base fee up to
1,000,000 s.f. 12,889$ 13,313$
each add'l s.f. 0.01$ 0.01$
2 500 base fee up to
500 s.f. $ 1,899 1,962$
each add'l s.f. $ 0.54 0.56$
2,500 base fee up to
2,500 s.f. $ 2,985 3,083$
each add'l s.f. 0.43$ 0.45$
5,000 base fee up to
5,000 s.f. $ 4,070 4,204$
each add'l s.f. 0.41$ 0.42$
10,000 base fee up to
10,000 s.f. $ 6,105 6,306$
each add'l s.f. 0.12$ 0.12$
50,000 base fee up to
50,000 s.f. $ 10,854 11,211$
each add'l s.f. 0.12$ 0.13$
100,000 base fee up to
100,000 s.f. $ 16,959 17,517$
each add'l s.f. $ 0.17 0.18$
I. NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS
Commercial/Industrial Uses - (All newly constructed or added space for non-residential occupancies classified as commercial or industrial that are not specifically addressed elsewhere in this Fee Schedule)
Fee No. Fee Name Fee Type Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) Notes
City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled Insp, Page 23 of 58
Building - Scaled Inspection Fees
Fee No. Fee Name Fee Type Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Notes
3 200 base fee up to
200 s.f. $ 204 210$
each add'l s.f. $ 0.34 0.35$
400 base fee up to
400 s.f. $ 271 280$
each add'l s.f. 0.34$ 0.35$
600 base fee up to
600 s.f. $ 339 350$
each add'l s.f. 0.17$ 0.18$
1,000 base fee up to
1,000 s.f. 407$ 420$
each add'l s.f. 0.07$ 0.07$
3,000 base fee up to
3,000 s.f. $ 543 561$
each add'l s.f. $ 0.18 0.19$
4 500 base fee up to
500 s.f. 1,628$ 1,682$
each add'l s.f. 0.27$ 0.28$
5,000 base fee up to
5,000 s.f. 2,849$ 2,943$
each add'l s.f. 0.08$ 0.08$
10,000 base fee up to
10,000 s.f. 3,256$ 3,363$
each add'l s.f. 0.03$ 0.04$
50,000 base fee up to
50,000 s.f. 4,613$ 4,765$
each add'l s.f. 0.03$ 0.03$
100,000 base fee up to
100,000 s.f. 6,105$ 6,306$
each add'l s.f. 0.004$ 0.004$
500,000 base fee up to
500,000 s.f. 7,598$ 7,848$
each add'l s.f. 0.01$ 0.01$
1,000,000 base fee up to
1,000,000 s.f. 10,311$ 10,651$
each add'l s.f. 0.01$ 0.01$
Shell Buildings for all Commercial/Industrial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as commercial or industrial that are not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable)
Accessory and Utility Uses - (All newly constructed, added or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled Insp, Page 24 of 58
Building - Scaled Inspection Fees
Fee No. Fee Name Fee Type Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Notes
5 500 base fee up to
500 s.f. 950$ 981$
each add'l s.f. 0.15$ 0.16$
5,000 base fee up to
5,000 s.f. 1,628$ 1,682$
each add'l s.f. 0.08$ 0.08$
10,000 base fee up to
10,000 s.f. $ 2,035 2,102$
each add'l s.f. 0.03$ 0.04$
50,000 base fee up to
50,000 s.f. $ 3,392 3,503$
each add'l s.f. 0.03$ 0.03$
100,000 base fee up to
100,000 s.f. $ 4,749 4,905$
each add'l s.f. $ 0.05 0.05$
6 500 base fee up to
500 s.f. $ 678 701$
each add'l s.f. 0.27$ 0.28$
2,500 base fee up to
2,500 s.f. $ 1,221 1,261$
each add'l s.f. 0.16$ 0.17$
5,000 base fee up to
5,000 s.f. $ 1,628 1,682$
each add'l s.f. 0.16$ 0.17$
10,000 base fee up to
10,000 s.f. $ 2,442 2,523$
each add'l s.f. 0.03$ 0.04$
50,000 base fee up to
50,000 s.f. $ 3,799 3,924$
each add'l s.f. 0.03$ 0.03$
100,000 base fee up to
100,000 s.f. $ 5,156 5,325$
each add'l s.f. $ 0.05 0.05$
7 Master Plotting Plan Review
Parcel (4 lots or less) each $ 271 280$ 5 - 25 lots each $ 543 561$
26 - 100 lots each $ 814 841$
>100 lots, per each additional 100 lots each $ 271 280$ Commercial Residential and Multifamily Residential Remodels - (All modifications or improvements to existing square footage for residential occupancies classified as CBC Group R (except R-3))
Commercial/Industrial Tenant Improvement -(All modifications or improvements to existing square footage)
City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled Insp, Page 25 of 58
Building - Scaled Inspection Fees
Fee No. Fee Name Fee Type Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Notes
8 500 base fee up to
500 s.f. 1,221$ 1,261$
each add'l s.f. 0.20$ 0.21$
2,500 base fee up to
2,500 s.f. 1,628$ 1,682$
each add'l s.f. 0.11$ 0.11$
5,000 base fee up to
5,000 s.f. $ 1,899 1,962$
each add'l s.f. 0.38$ 0.39$
Single Family Dwellings and Duplexes - (All newly constructed or added space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule)
City of Victorville
Master Fee Schedule
DRAFT
Bldg Scaled Insp, Page 26 of 58
Building - Miscellaneous Fee Items
II. MINOR/MISCELLANEOUS RESIDENTIAL & COMMERCIAL IMPROVEMENTS 1 Above Ground Storage Tank per permit $ 746 771$ 2 Battery Storage System
Residential Battery Storage System per permit $ 68 70$ Commercial Battery Storage System per permit $ 136 140$ 3 Cell Site
New Cell Site Including Tower & Enclosure each $ 746 771$ Retrofit of Existing Cell Site each $ 373 385$ 4 Awning or Canopy
Up to 1,000 s.f. each $ 1,085 1,121$
Over 1,000 s.f. each $ 746 771$
5 Certificate of Occupancy per permit $ 170 176$ 6 Temporary Certificate of Occupacy
Application each $ 1,221 1,261$
Deposit - currently $5,000, refundable if permanent C of O issued within 30 days each
7 Decks / Balcony each $ 373 385$
8 Demolition of Building each $ 373 385$ 9 Fence or Freestanding Wall
Up to 500 s.f. each $ 136 140$
500-5,000 s.f. each $ 204 210$
Over 5,000 s.f. each $ 312 322$
10 Fire Damage Repair - Residential
Minor per permit $ 746 771$
Major per permit $ 1,357 1,401$
11 New Fireplace Installation per permit $ 204 210$ 12 Investigational per permit $ 543 561$ 13 Manufactured House / Building
New Commercial per permit $ 848 876$ New Residential per permit $ 848 876$ Residential Conversion to Permanent Foundation per permit $ 644 666$ 14 Mobile Home (Within a park, per current edition of Title 25, published by California Division of Housing and Community Development.) Not to exceed Title 25 maximums: $196 sedown, $41/accessory structure
per permit Set by State Set by State
15 Partition/ Wall - Interior/Non-Structural <100' per permit $ 238 246$ 16 Patio Cover
Wood Frame each $ 373 385$
Wood Frame with Cover & Electrical each $ 424 438$ Pre-Engineered Non-Wood Frame each $ 272 281$ Pre-Engineered Non-Wood Frame with Electrical each $ 289 299$ 17 Patio Enclosure
Wood Frame each $ 407 420$
Wood Frame with Electrical each $ 424 438$ Pre-Engineered Non-Wood Frame each $ 272 281$ Pre-Engineered Non-Wood Frame with Electrical each $ 289 299$ 18 Photovoltaic Residential System (up to 15 kW) per permit [4] $ 339 350$ For each kw over 15 kW per kW [4] $ 15 15$ 19 Photovoltaic Residential Thermal Systems (Up to 15k Wth) per permit [4] $ 339 350$ For each kWth over 10 kWth per kWth [4] $ 15 15$ 20 Photovoltaic Commercial Systems (Up to 50 kW) per permit [4] $ 950 981$ For each kw between 51-250 kW per kW [4] $ 7 7$ 21 Photovoltaic Commercial Systems (250 kW) per permit [4] $ 2,400 2,393$ Plus (for each kw over 250 kW) per kW [4] $ 5 5$ 22 Photovoltaic Commercial Thermal Systems (Up to 30 kWth)) per permit [4] $ 950 981$ 2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Bldg Misc Items, Page 27 of 58
Building - Miscellaneous Fee Items
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
For each kwth between 30-260 kWth per kWth [4] $ 7 7$ 23 Photovoltaic Commercial Thermal Systems (260 kWth) per permit [4] $ 2,510 2,593$ Plus (for each kWth over 260 kWth) per kWth [4] $ 5 5$ 24 Remodel - Residential
Up to 500 s.f. each $ 611 631$
Over 500 s.f. each $ 814 841$
25 Retaining or Block Wall
Up to 500 s.f. each $ 187 193$
500-5,000 s.f. each $ 339 350$
26 Reroofing
Commercial per permit
0-10,000 squares $ 543 561$
10,000-50,000 squares $ 814 841$
Over 50,000 squares $ 1,085 1,121$
Residential per permit $ 272 281$
27 Roof Structure Repair / Reinforcement
Commercial each $ 814 841$
Residential each $ 814 841$
28 Shed per permit $ 543 561$
29 Sign
30 Wall Mount
Single per permit $ 339 350$
Multiple per permit $ 407 420$
Freestanding per permit
Single per permit $ 407 420$
Multiple per permit $ 475 491$
Electrical Circuits per permit $ 68 70$ 31 Up to 1 acre per permit $ 814 841$ 2 - 10 acres per permit $ 1,357 1,401$
Over 10 acres per permit $ 814 841$
Each additional 10 acres or fraction thereof per permit $ 81 84$ 32 Slab with Footings per permit $ 204 211$ 33 Spray Booth Install / Clean Room per permit $ 950 981$ 34 Siding/Stucco each $ 407 420$
35 Storage Racks
<8 ft, first 100 lf per permit $ 543 561$ each add'l. 100 lf per permit $ 27 28$ >8 ft, first 100 lf per permit $ 746 771$ >8 ft, ea. Add'l 100 lf per permit $ 41 42$ 36 Swimming Pool
Above Ground Pool/Spa per permit $ 339 350$ In Ground per permit $ 543 561$
37 Trash Enclosure Install per permit $ 475 491$ 38 Windows / Door
First 10 Windows each $ 272 281$
Each Additonal 10 Windows each $ 34 35$ Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis and compliance with the City's parking and driveway standards.
City of Victorville
Master Fee Schedule
DRAFT
Bldg Misc Items, Page 28 of 58
Building - Miscellaneous Fee Items
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
Other Inspections (Per Hour)
39 Inspections outside of normal business hours (minimum charge: two hours) per hour $ 157 162$ 40 Re-inspection fees per hour $ 136 140$ 41 Inspections for which no fee is specifically indicated (minimum charge: one half- hour) per hour $ 136 140$
42 Additional plan review required by changes, additions or revisions to approved plans (minimum charge: one half-hour) per hour [3] $ 136 140$ 43 Addressing per application $ 68 70$ 44 Application for Special Inspection per application $ 68 70$ Other Building Fees
45 Building Permit Revision, Fee + Third Party Hourly Charge per hour actual cost actual cost 46 Green Building Standards Plan Check and Inspection each actual cost actual cost 47 Green Building State Standards Fee (SB1473) each [1] $1.00 per every
$25,000 in
building
valuation or
fraction thereof
(minimum fee
$1.00)
$1.00 per every
$25,000 in
building
valuation or
fraction thereof
(minimum fee
$1.00)
48 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Residential each [1]
Pass through
from State:
$13.00 per
$100,000
valuation
(minimum $0.50
fee)
Pass through
from State:
$13.00 per
$100,000
valuation
(minimum
$0.50 fee)
49 Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Commercial each [1]
Pass through
from State:
$28.00 per
$100,000
valuation
(minimum $0.50
fee)
Pass through
from State:
$28.00 per
$100,000
valuation
(minimum
$0.50 fee)
per hour $ 136 140$
[Notes]
[1] Set per City policy
[2] Current fees are from Stand Alone Fee Kit.pdf and
BuildingChargedFeesMatrixFY1819.xlsx.
[3] Fee can be assessed for additional reviews beyond the third review, for any review where plans were resubmitted without addressing all corrections.
Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided.
City of Victorville
Master Fee Schedule
DRAFT
Bldg Misc Items, Page 29 of 58
Building - Mechanical, Plumbing, Electrical
III. PLUMBING, MECHANICAL AND ELECTRICAL PERMITS - NOT ASSOCIATED WITH A BUILDING PERMIT 1 Combination Stand Alone MPE Permit
Tier 1: 2 - 3 items from the list below $ 332 343$ Tier 2: 4 - 6 items $ 570 589$
Tier 3: Greater than 6 items - please see Alterations Permit -$ -$ 2 Singular Mechanical Permits per permit
FAU less than 100,000 Btu/h $ 143 148$ FAU greater than 100,000 Btu/h $ 237 245$ Mechanical Alteration / Repair Minor (1 inspection assumed) $ 190 196$ Mechanical Alteration / Repair Major (2 or more inspection assumed) $ 380 393$ Hood/Vent System $ 475 491$
3 Singular Electrical Permits per permit
Generator each $ 380 393$
Services of 600 volts or less and over 400 amperes to 1000 amperes in rating each $ 380 393$
Services over 600 volts or over 1000 amperes in rating each $ 475 491$ Services under 600 volts, 400 amps or less $ 237 245$ Electric Meter Reset $ 190 196$
Subpanel $ 237 245$
Temporary Power $ 237 245$
Lighting Poles
First pole each $ 332 343$
Each additional each $ 20 21$
Other Minor Electrical Alteration/Repair (1 inspection assumed) $ 190 196$ Other Major Electrical Alteration/Repair (2 or more inspections assumed) $ 380 393$ 4 Plumbing Permits per permit
Water Heater $ 143 148$
Water Service $ 143 148$
Sewer/Septic $ 237 245$
Trap/Interceptor $ 285 294$
Gas Line Air Test $ 190 196$
Other Minor Plumbing Alteration/Repair (1 inspection assumed) $ 190 196$ Other Major Plumbing Alteration/Repair (2 or more inspections assumed) $ 380 393$ 2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
City of Victorville
Master Fee Schedule
DRAFT
Bldg MPE, Page 30 of 58
Fire Prevention
I Construction Permits
1 Fire Sprinkler Systems: [2]
Commercial/Industrial National Fire Protection Association (NFPA) 13 Fire Sprinkler System - Modifications:
Plan Review flat $ 582 601$
Inspection, 1-5 fire sprinkler heads, per riser per riser $ 436 451$ Inspection, 6-19 fire sprinkler heads, per riser per riser $ 582 601$ Inspection, 20-50 fire sprinkler heads, per riser per riser $ 873 901$ Inspection, 51-100 fire sprinkler heads, per riser per riser $ 1,062 1,096$ Inspection, 101-350 fire sprinkler heads, per riser per riser $ 1,454 1,502$ Inspection, >350 fire sprinkler heads, per riser per riser $ 1,963 2,028$
Commercial/Industrial NFPA 13 Fire Sprinkler System - New First Riser (Per Building)
Plan Review flat $ 582 601$
Inspection, 1-20 fire sprinkler heads, first riser first riser $ 582 601$ Inspection, 21-50 fire sprinkler heads, first riser first riser $ 873 901$ Inspection, 51-100 fire sprinkler heads, first riser first riser $ 1,062 1,096$ Inspection, 101-350 fire sprinkler heads, first riser first riser $ 1,454 1,502$ Each additional riser (same hazard class) per riser $ 73 75$ Commercial Fire Pump
Plan Review flat $ 873 901$
Inspection flat $ 364 376$
Single Family Residential - NFPA 13D Fire Sprinkler
Plan Review flat $ 271 280$
Inspection, 1-3,600 sq. ft. flat $ 102 105$ Inspection, 3,601-5,000 sq. ft. flat $ 102 105$ Inspection, >5,000 sq. ft. flat $ 102 105$ Inspection, Tract Homes flat $ 68 70$ Modifications to existing system (per riser) per riser $ 34 35$ Manufactured Home-Factory Installed Sprinklers flat $ 34 35$ Tank or well supply, bucket test or pump test flat $ 34 35$ Multi-Family Residential Fire Sprinkler, NFPA 13R (per riser) Plan Review flat $ 582 601$
Inspection, 1-50 fire sprinkler heads, per riser per riser $ 727 751$ Inspection, 51-100 fire sprinkler heads, per riser per riser $ 945 976$ Inspection, >100 fire sprinkler heads, per riser per riser $ 1,163 1,202$ Modification to existing system flat $ 654 676$ Private Underground Fire Line:
Plan Review flat $ 582 601$
Inspection, 1-10 risers/hydrants, per system per system $ 800 826$ Inspection, 11-20 risers/hydrants, per system per system $ 1,163 1,202$ Inspection, >20 risers/hydrants, per system per system $ 1,672 1,727$
In-Rack Sprinklers:
Inspection, 1-10 sprinkler heads, per system per system $ 582 601$ Inspection, 11-20 sprinkler heads, per system per system $ 800 826$ Inspection, 21-30 sprinkler heads, per system per system $ 1,018 1,051$ Inspection, >30 sprinkler heads, per system per system $ 1,309 1,352$ 2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 31 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
2 Pre-Engineered Systems/Equipment [2]
Plan Review flat $ 582 601$
Inspection, Spray/Dipping/Power coating booths flat $ 291 300$ Inspection, Industrial Ovens, per system per system $ 291 300$ Inspection, Vapor Recovery, per system per system $ 291 300$ Inspection, Refrigeration, per system per system $ 291 300$ Inspection, Dust Collection, per system per system $ 436 451$ Inspection, Hood and Duct Extinguishing System, per system per system $ 654 676$ Inspection, Gas System, per system per system $ 436 451$ Inspection, Smoke Control System, per system per system $ 436 451$ Inspection, Battery System, per system per system $ 291 300$ Inspection, Special Extinguishing System, per system per system $ 436 451$ Inspection, Commercial Solar Power Generating Station flat $ 436 451$ Inspection, Commercial Structure-Mounted Photovoltaic System flat $ 582 601$ Inspection, Emergency Responder Radio Coverage flat $ 291 300$ 3 High-Piled Combustible Storage: [2]
Plan Review flat $ 582 601$
Inspection, 500-10,000 sq.ft. flat $ 654 676$ Inspection, 10,001-50,000 sq.ft. flat $ 1,091 1,127$ Inspection, 50,001-100,000 sq.ft. flat $ 1,527 1,577$ Inspection, each add'l 100,000 sq.ft. per 100K s.f. $ 1,527 1,577$ 4 Hose Rack/Standpipe Systems: [2]
Inspection, 1-5 Hose Racks/Standpipes flat $ 582 601$ Inspection, 6-10 Hose Racks/Standpipes flat $ 873 901$ Inspection, each add'l hose rack/standpipe (over 10) per add'l $ 582 601$ 5 Fire Alarm - New System (Per System) [2]
Waterflow Monitoring System Plan Review flat $ 582 601$ Manual/Automatic Fire Alarm System Plan Review flat $ 582 601$ Inspection, 1-10 initiating devices flat $ 654 676$ Inspection, 11-50 initiating devices flat $ 727 751$ Inspection, 51 or more initiating devices flat $ 945 976$
6 Fire Alarm System Modifications (All Types)(Per System) [2] Plan Review flat $ 582 601$
Inspection, 10 initiating devices flat $ 582 601$ Inspection, each add'l 10 initiating devices per add'l. $ 727 751$ Inspection, Fire Alarm Control Panel Upgrade flat $ 582 601$ 7 Aboveground Storage Tank [2]
Plan Review flat $ 582 601$
Inspection, 1st tank at location flat $ 73 75$ Inspection, each add'l tank per add'l. $ 291 300$ 8 Multi-Family Residential Construction Projects [2]
Plan Review flat $ 582 601$
Inspection, 1-10,000 sq.ft. flat $ 654 676$ Inspection, 10,001-25,000 sq.ft. flat $ 873 901$ Inspection, 25,001-50,000 sq.ft. flat $ 1,163 1,202$ Inspection, >50,000 sq.ft. each add'l 1,000 sq.ft. per add'l. $ 1,454 1,502$ City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 32 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
9 Commercial/Industrial New Construction Projects
[2]
Plan Review flat $ 582 601$
Inspection, 1-10,000 sq.ft. flat $ 582 601$ Inspection, 10,001-50,000 sq.ft. flat $ 873 901$ Inspection, 50,001-100,000 sq.ft. flat $ 1,163 1,202$ Inspection, 100,001-500,000 sq.ft. flat $ 1,381 1,427$ Inspection, 500,001-1,000,000 sq.ft. flat $ 2,327 2,403$ Inspection, >1,000,000 sq.ft., each add'l 100,000 sq.ft. per add'l. $ 1,091 1,127$ 10 Commercial Tenant Improvements [2]
Plan Review flat $ 582 601$
Inspection, 1-10,000 sq.ft. flat $ 582 601$ Inspection, 10,001-50,000 sq.ft. flat $ 873 901$ Inspection, 50,001-100,000 sq.ft. flat $ 1,163 1,202$ Inspection, >100,000 sq.ft., each add'l 10,000 sq.ft. per add'l. $ 1,091 1,127$ 11 Planning Project Review [2] See Planning
Fee Schedule
See Planning
Fee Schedule
12 Water Improvement - Public Water Line (Plan Review) [2] First 1-10 hydrants flat $ 582 601$
>10 hydrants, each add'l 10 hydrants per add'l. $ 945 976$ 13 Other Miscellaneous Development Review Fees [2]
Hazardous Material Review - per hour hourly $ 291 300$ Technical Analysis/Opinion Report - per hour hourly $ 291 300$ Alternate Materials and Methods Request - per hour hourly $ 291 300$ 14 Revision of a previously approved plan or As-Builts flat [2] $ 727 751$ 15 Plan re-submittal; each subsequent submittal after 2nd/miscellaneous plan check (per hour) hourly [2] $ 291 300$ City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 33 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
II Annual Operational Permits
16 Base Permit Fee - Facility Size
0 - 5,000 sq.ft. flat $ 364 376$
5,001 - 10,000 sq.ft. flat $ 436 451$ 10,001 - 50,000 sq.ft. flat $ 582 601$ 50,001 - 100,000 sq.ft. flat $ 654 676$ 100,001 - 500,000 sq.ft. flat $ 727 751$ 500,000 - 1,000,000 sq.ft. flat $ 873 901$ > 1,000,000 sq.ft. flat $ 145 150$
17 Annual Operational Permit - per Permit
Low Hazard [1]
Automobile Wrecking Yards flat $ 73 75$ Cellulose Nitrate Film flat $ 73 75$ Open Flames and Candles flat $ 73 75$ Places of Assembly 50-299 flat $ 73 75$ Medium Hazard [1]
Carbon Dioxide Enrichment Systems flat $ 73 75$ Carbon Dioxide Systems In Beverage Dispensing flat $ 73 75$ Combustible Fibers flat $ 73 75$
Dry Cleaning flat $ 73 75$
Fixed Hood & Duct Extinguishing Systems flat $ 73 75$ Industrial Ovens flat $ 73 75$
Liquid or Gas Fuel Equipment in Assembly Buildings flat $ 73 75$ Lumber Yards and Woodworking flat $ 73 75$ Miscellaneous Combustible Storage flat $ 73 75$ Motor Vehicle Fuel Dispensing flat $ 73 75$ Pyroxylin Plastics flat $ 73 75$
Places of Assembly 300-999 Occupants flat $ 73 75$ Production Facilities flat $ 73 75$ Refrigeration Equipment flat $ 73 75$ Rooftop Heliports flat $ 73 75$
Storage of Scrap Tires and Tire Byproducts flat $ 73 75$ Waste Handling flat $ 73 75$
Wood, Manure, and Organic Product Storage flat $ 73 75$ City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 34 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
High Hazard [1]
Aerosol Products flat $ 73 75$
Aviation Facilities flat $ 73 75$
Battery Systems flat $ 73 75$
Combustible Dust Producing Operations flat $ 73 75$ Compressed Gases flat $ 73 75$
Cryogenic Fluids flat $ 73 75$
Explosives flat $ 73 75$
Flammable and Combustible Liquids flat $ 73 75$ High-piled Combustible Storage flat $ 73 75$ Hot Works Operations flat $ 73 75$ HPM Facilities flat $ 73 75$
Liquefied Petroleum Gasses flat $ 73 75$ Magnesium flat $ 73 75$
Organic Coatings flat $ 73 75$
Pallet Yards flat $ 73 75$
Places of Assembly 1,000+ Occupants flat $ 73 75$ Plant Extraction Systems flat $ 73 75$ Repair Garages flat $ 73 75$
Spraying or Dipping flat $ 73 75$
Tire Rebuilding Plants flat $ 73 75$ Reinspection per inspection $ 73 75$ III Special Event/Temporary Use Permits
18 Miscellaneous Counter Permit (No inspection req'd) flat [2] $ 145 150$ 19 Application Review [2]
Minor Special Event/Temporary Use Application flat $ 400 413$ Major Special Event/Temporary Use/Film Permit Application flat $ 582 601$ 20 Minor Special Event/Temporary Uses - inspection [2]
Miscellaneous Minor Event (up to 500 attendees) flat $ 327 338$ Seasonal Sales Lot flat $ 218 225$
Rocket Launching (high powered or experimental) flat $ 545 563$ Haunted House/Fun House/Maze flat $ 400 413$ Bonfire flat $ 473 488$
Tents, canopies and temporary membrane structure flat $ 327 338$ Each add'l structure flat $ 73 75$ 21 Major Special Event/Temporary Uses - Inspection [2]
Miscellaneous Major Event (501+ attendees) Actual Cost Actual Cost Actual Cost Film Shoot with Hazards Actual Cost Actual Cost Actual Cost 22 Fireworks Public Display [2]
First Two Hours first 2 hours $ 654 676$ Each additonal hour after two hours hourly $ 291 300$ 23 Inspection - each add'l hour per hour $ 291 300$ City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 35 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
24 Cost Recovery During Event Actual Cost [2] Actual Cost Actual Cost 25 Special Event Standby Fees
Personnel
Note - The special event standby charges for suppression and non- suppression personnel are billed at the same amount as the employee classification hourly rates.
Actual Cost Actual Cost
Equipment
Note - Equipment Standby Fee will be billed at the applicable equipment rate per Federal Highway Administration Guidelines. Actual Cost Actual Cost IV Mandated or Required Occupancy Inspections
26 State Fire Marshal Regulated Occupancies [1]
Day Care Facility - Group E Occupancy - 7 or more clients (not required assistance) Initial inspection up to 2 hrs flat $ 218 225$ Public and Private Schools - Group E Occupancy flat $ 364 376$ Health Care Facilities/Nursing homes/Detox Centers - Group I-2 Occupancy - Initial inspection up to 2 hrs flat $ 291 300$ Detention facility - Group I-2 Occupancy - Initial inspection up to 2 hrs flat $ 145 150$ Day Care facility -(7+ persons) requiring assistance 0 Group I-4 - Initial inspection up to 2 hrs flat $ 145 150$ Multi-Family housing - (Hotel/Motel/Apartments) Group R-1/R-2 3 dwelling units flat [1] $ 291 300$ 4-15 dwelling units flat [1] $ 364 376$ 16-49 dwelling units flat [1] $ 436 451$ 50-99 dwelling units flat [1] $ 509 526$ 100-199 dwelling units flat [1] $ 654 676$ 200+ dwelling units flat [1] $ 582 601$ Residential Care Facility - Group R-2.1 Occupancy flat $ 436 451$ Residential Care Facility - R-3.1 Occupancy flat $ 436 451$ Residential Care Facility - R-4 Occupancy flat $ 436 451$ High Rise, Initial inspection up to 2 hrs up to 2 hrs $ 582 601$ State Fire Marshal Regulated Occupancy - Health Care, Detention Facilities, and High Rises, per add'l hour after 2 hrs
per add'l hr
after 2 hrs $ 291 300$
27 Other Required or Mandated Inspections
General Field Inspection/Occupancy Inspection (per hour) hourly $ 291 300$ V Miscellaneous Fees
28 Administrative Changes
Juvenile Firesetters Intervention - Program Actual Cost Actual Cost 29 Duplication fee with certification stamp per page City Clerk Fee Schedule
City Clerk Fee
Schedule
30 Duplication fee per page City Clerk Fee
Schedule
City Clerk Fee
Schedule
31 Payment Plan flat $ 291 300$
32 Fiscal Administrative Fee each Actual cost Actual cost City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 36 of 58
Fire Prevention
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
33 Returned Check Fee
First Returned Check Fee first
See City
Finance Fee
Schedule
See City
Finance Fee
Schedule
Subsequent Returned Check Fee each
See City
Finance Fee
Schedule
See City
Finance Fee
Schedule
34 Civil Subpoena Fees
Record subpoena fee - research/preparation hourly $ 291 300$ Civil subpoena witness fee daily [3] Set by State Set by State VI Cost Recovery
35 Hourly Rates
Prevention hourly $ 291 300$
Suppression/Operations hourly [4] $ 36 36$ 36 Equipment Rates
per cal OES schedule [4]
37 Administrative Penalties for False or Nuisance Fire Alarms [5] First, Second, and Third Response per response 436$ 451$ Four to Five Responses per response 436$ 451$ Six to Seven Responses per response 436$ 451$ Eight or More Responses per response 436$ 451$ 38 Other Incident Related Fees each Actual Cost Actual Cost Notes
[1] Total fee charged will be Base Fee + any applicable Annual Operating Permit fee(s)
[2] Costs/fees for other department review may apply separately [3] Regulated by California Code of Regulations, Title 8, 382. Witness Fees. [4] Hourly Rates per CAL OES Schedule.
[5] Per section 3.5 of Ordinance 2266, 1-18-2011, these are fees, not fines. [6] Set by City policy
City of Victorville
Master Fee Schedule
DRAFT
Fire Prev, Page 37 of 58
Police
1 Administrative Tow [3]
Driver Not Arrested per driver $ 199 206$ Driver Arrested per driver $ 199 $ 206
2 Clearance Letter (per 5 booking requests) per 5 booking requests $ 26 $ 26
3 Fingerprint Ink Card per card [1] $ 19 $ 20
4 Live Scan Rolling per person [1] $ 19 $ 20
5 Vehicle Repossession (state mandated) [2] $ 15 $ 15
6 DUI Cost Recovery Billing [4] Actual Cost -
Max $12,000
Actual Cost -
Max $12,000
7 Hourly Rate - Sworn [3] $ 184 $ 190
8 Hourly Rate - Non Sworn [3] $ 77 $ 79
9 Overtime Rates [5]
Deputy per hour $ 184 $ 190 Detective per hour $ 184 $ 190 Sergeant per hour $ 184 $ 190 Notes
[1] Department of Justice fee applies separately.
[2] Fee mandated by State Government code 41612.
[3] Cost of Tow applied separately
[4]
[5] For use on special events or other instances where an OT rate is required. 2023 Updated
Fee Level /
Deposit
CPI 3.29%
CA government code sections 53150 through 53158: Actual cost of personnel, up to maximum of $12,000 for Accident Response and Investigation.
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
City of Victorville
Master Fee Schedule
DRAFT
Police, Page 38 of 58
Business License
1 Business Type
In-City New Application Fees
VMC 020 Retail/Misc per license 367$ 379$ VMC 030 Service/Delivery per license 367$ 379$ VMC 040 Administrative per license 367$ 379$ VMC 050 Manufacturing per license 367$ 379$ VMC 060 Professional per license 367$ 379$ VMC 070 Contractors per license 367$ 379$ VMC 080A SFR Rentals per license 335$ 347$ VMC 080B MFR Rentals per license 351$ 363$ VMC 080C Motels/Hotels per license 351$ 363$ VMC 090 Entertainment/Amusement per license 367$ 379$ VMC 100 Film/Photography per license 812$ 838$ VMC 110 Vehicles for Hire per license 967$ 999$ VMC 120 Solicitors/Peddlers per license 712$ 736$ VMC 130 Firearms/Pawnshops per license 458$ 473$ VMC 140 Massage per license 399$ 412$ VMC 150 Exempt per license -$ -$
2 Out-of-City New Application Fees
VMC 020 Retail/Misc per license 80$ 82$ VMC 030 Service/Delivery per license 80$ 82$ VMC 040 Administrative per license 80$ 82$ VMC 050 Manufacturing per license 80$ 82$ VMC 060 Professional per license 80$ 82$ VMC 070 Contractors per license 80$ 82$ VMC 090 Entertainment/Amusement per license 80$ 82$ VMC 110 Vehicles for Hire per license 456$ 471$ VMC 120 Solicitors/Peddlers per license 425$ 439$ VMC 130 Firearms/Pawnshops per license 249$ 258$ VMC 140 Massage per license 175$ 181$ VMC 150 Exempt per license -$ -$
3 Renewal Fees
VMC 020 Retail/Misc per license 80$ 82$ VMC 030 Service/Delivery per license 80$ 82$ VMC 040 Administrative per license 80$ 82$ VMC 050 Manufacturing per license 80$ 82$ VMC 060 Professional per license 80$ 82$ VMC 070 Contractors per license 80$ 82$ VMC 080A SFR Rentals per license 95$ 99$ VMC 080A SFR Rentals per license 95$ 99$ VMC 080B MFR Rentals per license 95$ 99$ VMC 080B MFR Rentals > 9 per unit 111$ 115$ VMC 080C Motels/Hotels per license 111$ 115$ VMC 080B MFR Rentals > 9 per unit 111$ 115$ VMC 090 Entertainment/Amusement per license 80$ 82$ VMC 110 Vehicles for Hire per license 297$ 307$ VMC 120 Solicitors/Peddlers per license 265$ 274$ VMC 130 Firearms/Pawnshops per license 170$ 175$ VMC 140 Massage per license 127$ 132$ VMC 150 Exempt per license -$ -$
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Business License, Page 39 of 58
Business License
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
4 In-City Modification Fees
VMC 020 Retail/Misc per license 95$ 99$ VMC 030 Service/Delivery per license 95$ 99$ VMC 040 Administrative per license 95$ 99$ VMC 050 Manufacturing per license 95$ 99$ VMC 060 Professional per license 95$ 99$ VMC 070 Contractors per license 95$ 99$ VMC 080A SFR Rentals per license 80$ 82$ VMC 080B MFR Rentals per license 95$ 99$ VMC 080C Motels/Hotels per license 95$ 99$ VMC 090 Entertainment/Amusement per license 95$ 99$ VMC 110 Vehicles for Hire per license 286$ 296$ VMC 120 Solicitors/Peddlers per license 255$ 263$ VMC 130 Firearms/Pawnshops per license 143$ 148$ VMC 140 Massage per license 127$ 132$ VMC 150 Exempt per license -$ -$
5 Out-of-City Modification Fees
VMC 020 Retail/Misc per license 48$ 49$ VMC 030 Service/Delivery per license 48$ 49$ VMC 040 Administrative per license 48$ 49$ VMC 050 Manufacturing per license 48$ 49$ VMC 060 Professional per license 48$ 49$ VMC 070 Contractors per license 48$ 49$ VMC 090 Entertainment/Amusement per license 48$ 49$ VMC 110 Vehicles for Hire per license 239$ 247$ VMC 120 Solicitors/Peddlers per license 207$ 214$ VMC 130 Firearms/Pawnshops per license 95$ 99$ VMC 140 Massage per license 80$ 82$ VMC 150 Exempt per license -$ -$
6 Duplicate License/Renewal Notice Fee per license 19$ 20$ 7 Update License Fee per license 48$ 49$ 8 Return Mail Fee per license 95$ 99$ 9 Expedited Processing Fee per license 95$ 99$ City of Victorville
Master Fee Schedule
DRAFT
Business License, Page 40 of 58
Code Enforcement
1 Abatement Board Up Expense each Actual Cost Actual Cost 2 Citation Fee each Per Citation
Schedule
Per Citation
Schedule
3 Cite Dismissal Fee each
Processing Fee each -$ -$
Third Party Charge each Actual Cost Actual Cost
4 Abatement CleanUp Expense Fee each Actual Cost Actual Cost 5 Weed Abatement Expense Fee each Actual Cost Actual Cost 6 Inspector Marijuana Grow Inspection Fee each 598$ 618$ 7 Code Officer Marijuana Inspection Fee each 6,407$ 6,618$ 8 Commitment Letter Activity each 286$ 296$ 9 Compliance Inspecton each 95$ 99$ 10 Demand Activity each 239$ 247$
11 Invoice Activity each 191$ 197$
12 Miscellaneous Code Enforcement each Actual Cost Actual Cost 13 NOP Filed Activity each 286$ 296$
14 City Pool Pump each 668$ 690$
15 Administrative Citation Schedule [3]
Violation per occurrence 100$ 100$
First Violation w/in 12mos per occurrence 200$ 200$ Second Violation w/in 12 mos per occurrence 400$ 400$ Third Violation w/in 12 mos per occurrence 1,000$ 1,000$ Fourth Violation w/in 12 mos per occurrence 37$ 37$ 16 Property Compliance Inspection each [2] 382$ 395$ 17 Business License Revocation Action each 668$ 690$ Current Fee /
DepositFee No.
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Code Enforcement, Page 41 of 58
Code Enforcement
Current Fee /
DepositFee No.
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee Name Fee Type
Notes
Fire Hazard / Weed Abatement Program [4]
18 Inspection each 191$ 197$
19 Inspection - contiguous parcels each 382$ 395$ 20 Notification each 95$ 99$
21 Notification - contiguous parcels each 95$ 99$ 22 Compliance inspection each 191$ 197$ 23 Compliance inspection - contiguous parcels each 382$ 395$ 24 Case closure inspection each 95$ 99$ 25 Case closure inspection - contiguous parcels each 95$ 99$ 26 Commitment letter processing each 286$ 296$ 27 Public request for vehicle abatement and removal each Actual Cost Actual Cost 28 Warrant procurement and processing each 668$ 690$ 29 Expedited Processing Fee (NOPWDS) each 286$ 296$ Fats, Oils and Grease (FOG) Program
30 New Application
Grease Trap flat 286$ 296$
Grease Interceptor flat 286$ 296$
31 Renewal
Grease Trap flat 191$ 197$
Grease Interceptor flat 286$ 296$
32 FOG Compliance Inspection - Trap each 191$ 197$ 33 FOG Compliance Inspection - Interceptor each 382$ 395$ Notes
[1] Other fees may apply.
[2] For real estate sales.
[3] Fines/Penalties
[4] Authority to charge Fire Hazard/Weed Abatement Fees is City of Victorville municipal code Title 8, Chapter 8.12.
City of Victorville
Master Fee Schedule
DRAFT
Code Enforcement, Page 42 of 58
Animal Control
1 Returned to Owner Fees Altered Dogs
Impound Fee/day per day 22$ 22$
Apprehension
1st Offense 190$ 196$
2nd Offense 190$ 196$
3rd Offense 190$ 196$
4th / subsequent 190$ 196$
Dog with No License
1st Offense 259$ 268$
2nd Offense 259$ 268$
3rd Offense 259$ 268$
4th / subsequent 259$ 268$
Dog with License
1st Offense 212$ 219$
2nd Offense 212$ 219$
3rd Offense 212$ 219$
4th / subsequent 212$ 219$
2 Returned to Owner Fees Unaltered Dogs
Impound Daily per day 22$ 22$
Apprehension
1st Offense per day 190$ 196$
2nd Offense per day 190$ 196$
3rd Offense per day 190$ 196$
4th / subsequent per day 190$ 196$
State Mandate
1st Offense per day 35$ 35$
2nd Offense per day 50$ 50$
3rd Offense per day 100$ 100$
4th / subsequent per day 100$ 100$
Dog with No License
1st Offense per day 294$ 304$
2nd Offense per day 309$ 320$
3rd Offense per day 359$ 371$
4th / subsequent per day 359$ 371$
Dog with License
1st Offense per day 247$ 255$
2nd Offense per day 262$ 270$
3rd Offense per day 312$ 322$
4th / subsequent per day 312$ 322$
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
City of Victorville
Master Fee Schedule
DRAFT
Animal Control, Page 43 of 58
Animal Control
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
3 Owner Turn In Fees
Licensed Live Dog per animal 190$ 196$ Licensed Dog, DOA per animal 143$ 147$ Unlicensed Live Dog per animal 190$ 196$ Unlicensed Dog, DOA per animal 143$ 147$ Live Cat per animal 190$ 196$
Cat, DOA per animal 143$ 147$
All Other Small Animals per animal 95$ 98$ All Other Animals Larger than a Dog per animal [1] 190$ 196$ DOA Livestock per animal
Refer to Private
Company for
Removal
Refer to
Private
Company for
Removal
Additional Animals per animal 16$ 16$ PTS per animal 190$ 196$
4 License Fees for Altered Dogs
1 year license per dog 20$ 21$
2 year license per dog 30$ 31$
3 year license per dog 40$ 41$
5 License Fees for Unaltered Dogs
1 year license per dog 48$ 49$
6 New Licenses for Unaltered Animals 68$ 70$ Vouchers for sterility per animal 100$ 103$ 7 License Fees for Senior Citizens with Altered Dogs
1 year license per dog 15$ 15$
2 year license per dog 25$ 26$
3 year license per dog 35$ 36$
8 Impound / Quarantine per day 22$ 22$
9 Rabies Vaccination @ VCA per dog
City processing 95$ 98$
Vaccination Actual Cost Actual Cost
City of Victorville
Master Fee Schedule
DRAFT
Animal Control, Page 44 of 58
Animal Control
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
10 Permit Fees
Animal Dealer 238$ 245$
Animal Exhibition 238$ 245$
Animal Exhibition 238$ 245$
Wild Animal per animal 238$ 245$
Wild Animal Menagerie 238$ 245$
Rodeo 238$ 245$
Rodeo Daily Fee 238$ 245$
Stables 238$ 245$
Reptiles 238$ 245$
Petting Zoo 238$ 245$
Dog Kennel 238$ 245$
Cat Kennel 238$ 245$
Pet Shop 238$ 245$
Grooming Parlor 238$ 245$
Domestic Dog Breeder 238$ 245$
11 After Hours Call Out hourly - 2 hours
minimum 206$ 213$
12 Animal Compliance Inspection per inspection 190$ 196$ Notes
[1] Other fees may apply.
City of Victorville
Master Fee Schedule
DRAFT
Animal Control, Page 45 of 58
Economic Development
1 TEFRA per application 2,267$ 2,341$
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Current Fee /
Deposit Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT Economic Development, Page 46 of 58
Public Works - Parks
1 Joshua Tree Inspections
1st half acre per project 136$ 140$
Each add'l half acre per half acre 34$ 35$ Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Parks, Page 47 of 58
VMUS
Electric Service Rules
Rule 3
1 Turn on Service Charge
Service Turn On flat 40$ 41$
Service Turn On - After Hours flat 60$ 62$ Rule 7
2 Minimum Deposit
deposit
Set by City
Policy (Electric
Rules and
Regulations)
Set by City
Policy (Electric
Rules and
Regulations)
Minimum Diversion Deposit
deposit
Set by City
Policy (Electric
Rules and
Regulations)
Set by City
Policy (Electric
Rules and
Regulations)
Rule 9
3 Returned Check Charge
Returned Item (Check or Credit Card) each [1] 25$ 25$ Returned Item - each add'l each [1] 35$ 35$ 4 Manual Meter Read Charge flat 80$ 83$ 5 Late Payment Charge of Unpaid Balance
Set by City
Policy (Electric
Rules and
Regulations)
Set by City
Policy (Electric
Rules and
Regulations)
Rule 11
6 Collection Fee
Set by City
Policy (Electric
Rules and
Regulations)
Set by City
Policy (Electric
Rules and
Regulations)
7 Special 48-Hour Field Notification
Set by City
Policy (Electric
Rules and
Regulations)
Set by City
Policy (Electric
Rules and
Regulations)
8 Investigation Charges Actual Cost Actual Cost
9 Meter Repairs or Replacements Due to Damage/Tampering Actual Cost Actual Cost A. Subdivisions
10 Electrical Underground Utilities (Improvement Bonds) Add'l Developer Fees Actual Cost Actual Cost
Delay of work longer than 12 months Actual Cost Actual Cost 11 F. Plan Check Fees
Administrative Fees Actual Cost Actual Cost
12 Inspection Fees Actual Cost Actual Cost
13 Meter Test Fee Actual Cost Actual Cost
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT VMUS, Page 48 of 58
VMUS
Current Fee /
Deposit
2023 Updated
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Natural Gas Service Rules
Rule 3
14 Turn on Service Charge
Service Turn On flat 40$ 41$
Service Turn On - After Hours flat 60$ 62$ Rule 7
15 Minimum Deposit
deposit
Set by City
Policy (Gas
Rules and
Regulations)
Set by City
Policy (Gas
Rules and
Regulations)
Minimum Diversion Deposit
deposit
Set by City
Policy (Gas
Rules and
Regulations)
Set by City
Policy (Gas
Rules and
Regulations)
Rule 9
16 Returned Check Charge
Returned Item (Check or Credit Card) each [1] 25$ 25$ Returned Item - each add'l each [1] 35$ 35$ 17 Manual Meter Read Charge 80$ 83$ 18 Late Payment Charge of Unpaid Balance
Set by City
Policy (Gas
Rules and
Regulations)
Set by City
Policy (Gas
Rules and
Regulations)
Rule 11
19 Collection Fee
Set by City
Policy (Gas
Rules and
Regulations)
Set by City
Policy (Gas
Rules and
Regulations)
20 Special 48-Hour Field Notification
Set by City
Policy (Gas
Rules and
Regulations)
Set by City
Policy (Gas
Rules and
Regulations)
21 Investigation Charges Actual Cost Actual Cost
22 Meter Repairs or Replacements Due to Damage/Tampering Actual Cost Actual Cost Subdivisions
23 Gas Underground Utilities (Improvement Bonds)
Add'l Developer Fees Actual Cost Actual Cost
Delay of work longer than 12 months Actual Cost Actual Cost 24 F. Plan Check Fees
Administrative Fees Actual Cost Actual Cost
25 Inspection Fees Actual Cost Actual Cost
26 Meter Test Fee Actual Cost Actual Cost
Notes
[1] Set by Civil Code Section 1719
City of Victorville
Master Fee Schedule
DRAFT VMUS, Page 49 of 58
Water - Customer Service
I Utility Service Account Fees
1 Customer Account Set-up Fee each 54$ 56$ 2 Security Deposit deposit [1] 120$ 124$ 3 Security Deposit for Temporary Water Use deposit [1] 18$ 19$ 4 Delinquency Charge [1]
5% of unpaid
customer
balance
5% of unpaid
customer
balance
5 Administrative Lien Processing per occurrence 99$ 102$ 6 Documentation [3] $0.10/page $0.10/page
7 Vehicle/Equipment Rate Actual Cost Actual Cost
8 Damage or Loss/Vandalism Actual Cost Actual Cost
9 Other Fees and Service Charges each [4] Actual Cost Actual Cost 10 Returned Checks
Bank Fee each [5] Actual Cost Actual Cost
Returned Item (Check or Credit Card) each [2] 25$ $ 25 Returned Item - each add'l each [2] 35$ $ 35 11 Payment Plan Setup Fee each 36$ 37$ Notes
[1] Fee set by policy
[2] Set by Civil Code Section 1719
[3] Refer to the City Clerk Schedule
[4] Other fees may apply.
[5] Regulated by California Government Code Section 6157.
Current Fee /
Deposit
Recommended
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT
Water - Cust Svc, Page 50 of 58
Water - Utility Permits
I Water Fees
1 Connection and Alternate Water Source Fees [1]
Meter Installation
2 3/4-inch Meter
Meter Install Service each 139$ 144$
Meter Cost each [1] Actual Cost Actual Cost
Service Line (Installation Fee) each 2,202$ 2,274$ 3 1-inch Meter
Meter Install Service each 139$ 144$
Meter Cost each [1] Actual Cost Actual Cost
Service Line (Installation Fee) each 2,202$ 2,274$ 4 1.5-inch Meter
Meter Install Service each 164$ 169$
Meter Cost each [1] Actual Cost Actual Cost
Service Line (Installation Fee) each 2,202$ 2,274$ 5 2-inch Meter
Meter Install Service each 164$ 169$
Meter Cost each [1] Actual Cost Actual Cost
Service Line (Installation Fee) each 2,202$ 2,274$ 6 Above 2-inch Meter [1]
Meter Install Service each Actual Cost Actual Cost
Meter Cost each Actual Cost Actual Cost
Service Line (Installation Fee) each Actual Cost Actual Cost 7 Meter Size or Location Change Actual Cost Actual Cost 8 Standby Fee WID1 - per acre or parcel of land with less than one acre yearly [1,4] 9 Standby Fee WID2 - per acre yearly [1,4]
10 Service Call Fees
During business hours hourly 147$ 152$ Same-day service - business hours hourly 147$ 152$ After hours service hourly 165$ 170$
11 Labor Rates
During business hours hourly 147$ 152$ After hours service hourly 165$ 170$
12 Vehicle/Equipment Rate [1] Actual Cost Actual Cost
13 Service Deactivation for Non-Payment [3]
Shut-Off (Regular Hours) per occurrence 42$ 43$ Turn-On (Regular Hours) per occurrence 50$ 52$ Shut-Off (After Hours) - two hours minimum per occurrence 150$ 155$ Turn-On (After Hours) - two hours minimum per occurrence 150$ 155$ 14 Meter Test Charge deposit [1] Actual Cost Actual Cost Current Fee /
Deposit
Recommended
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
City of Victorville
Master Fee Schedule
DRAFT Water - Utility Permits, Page 51 of 58
Water - Utility Permits
Current Fee /
Deposit
Recommended
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
15 Backflow (RP) Device Test per occurrence 183$ 189$ 16 Cross Connection Initial Inspection per occurrence 220$ 227$ 17 Annual Backflow Certification Fee per device [2] 49$ 51$ 18 Failed Device Re-Test per device 24$ 25$ 19 Construction Meter Installation Fee
Customer Set-Up Fee per device
Charged by
Customer
Service
Charged by
Customer
Service
Water Charges Installation Fee per device 191$ 197$ 20 Cross Connection Plan Check per device 73$ 76$ Notes
[1] Please see Development Impact Fee Schedule.
[2] City processing fee only; applicant pays for contractor expense separately [3] Subject to SB 998
[4]
The District's standby charges appear on the property tax bills. A standby charge is a fee that is applied to properties to ensure that adequate water sedrvice will be available for that parcel when needed.
City of Victorville
Master Fee Schedule
DRAFT Water - Utility Permits, Page 52 of 58
City Clerk and Miscellaneous Administrative Fees
1 Microfilm Processing per request Actual Cost Actual Cost 2 Public Records Requests per request $0.10 per page $0.10 per page 3 Notary Services per request $15 Notary Fee $15 Notary Fee 4 Demand Research Fee per request Set by State Set by State 5 Technology Fee per application [1] 4.6% 4.8%
Notes
[1] Applies to certain permit types per the 2022 Fee
Study Final report
Recommended
Fee Level /
Deposit
CPI 3.29%
Fee No. Fee Name Fee Type
Notes
Current Fee /
Deposit
City of Victorville
Master Fee Schedule
DRAFT
Clerk & Misc., Page 53 of 58
Late Returns
Juvenile / YA / Children's per day, per
item $0 -$
Adult per day, per
item $0 -$
Magazines per day, per
item $0 -$
DVDs per day, per
item $0 -$
Free Rentals per day, per
item $0 -$
Non-returned item (books or materials) per item cost of item cost of item Non-returned item processing fee $ 10 10$ Check Out Services
DVD's per item per 3
days $ 1.50 1.55$
Video Games per item per 3
days $ 3 3$
Copy Services
Black/White Copies - Single Sided per page $ 0.15 0.15$ Color Copies - Single Sided per page $ 0.50 0.50$ Passport Services
Passport Photo per photo $ 10 10$
Passport Processing Fee per application $ 35 35$ Miscellaneous Services
Credit Card Processing Fee per transaction Actual Cost Actual Cost Recommended
Fee Level /
Deposit
CPI 3.29%
Fee Name
Fee Type (Flat /
Deposit /
Hourly)
Current Fee /
Deposit
City of Victorville
Master Fee Schedule
DRAFT
Library, Page 54 of 58
Recreation
1 Youth Programs
Child Late Pickup [1] $10/$20 $10/$20
Parent & Tot $45/month Resident: $45/month
Non-resident: $50/month
Itty Bitty Threes/Fours/Camp $65/month Resident: AM: $4/hr PM: $3.50/hr Non-resident: AM: $4.50/hr PM: $4/hr
Kids K-12 Camp $129/month Resident: $2.75/hr
Non-resident: $3/hr
2 Youth Sports
Basketball $65 + $5 non-
resident
Resident: $67
Non-resident: $74
T-Ball $65 + $5 non-
resident
Resident: $67
Non-resident: $74
Volleyball $65 + $5 non-
resident
Resident: $67
Non-resident: $74
Flag Football $65 + $5 non-
resident
Resident: $67
Non-resident: $74
VIP Basketball Resident: $50
Non-resident: $55
3 Pee Wee Sports
Sports Sampler $40 + $5 non-
resident
Resident: $41
Non-resident: $45
Basketball $50 + $5 non-
resident
Resident: $52
Non-resident: $57
T-Ball $50 + $5 non-
resident
Resident: $52
Non-resident: $57
4 Adult Sports Per Team
Basketball (18+) $ 400 Basketball (35+) $ 250 Soccer
$325 early
bird/$350
regular
$ 350 Softball $350 / $375 $ 375 Soccer Tournaments $ 200 $ 200 Softball Tournaments $ 200 $ 200
5 Drop-In
Open Gym $5/day $5/day
Pickleball $4/day $4/day
Current Fee /
Deposit
Recommended Fee Level / Deposit
CPI 3.29%Fee No. Fee Name
Notes
City of Victorville
Master Fee Schedule
DRAFT Recreation, Page 55 of 58
Recreation
Current Fee /
Deposit
Recommended Fee Level / Deposit
CPI 3.29%Fee No. Fee Name
Notes
6 Aquatics
Open Recreation Swim $3/day $3/day
Punch Pass (15 admissions) $30/$15
admissions $ 30 Individual Lessons $136/session Resident: $34/hr
Non-resident: $37/hr
Group Lessons $28/session Resident: $13/hr
Non-resident: $14/hr
Junior Lifeguard $50/session $50/session
Lifeguard Training $200/session $200/session
7 Ballfields
Ballfield without Lights (2-hour min) Hourly
Level 1 $ 4 $ 4 Level 2 $ 12 $ 12 Level 3 $ 24 $ 25 Level 4 $ 36 $ 37 Ballfield with Lights Hourly
Level 1 $ 24 $ 25 Level 2 $ 42 $ 43 Level 3 $ 59 $ 61 Level 4 $ 90 $ 93 Drag $ 16 $ 17
City of Victorville
Master Fee Schedule
DRAFT Recreation, Page 56 of 58
Recreation
Current Fee /
Deposit
Recommended Fee Level / Deposit
CPI 3.29%Fee No. Fee Name
Notes
8 Facilities
Large Auditorium (4 hr. min)
Standard Rate:
$50/hr.
Resident Rate:
$45/hr.
Resident: $45/hr
Standard: $50/hr
Small Auditorium (2 hr. min)
Standard Rate:
$44/hr. Resident
Rate: $39/hr.
Resident: $39/hr
Standard: $43/hr
Small Meeting Room (2 hr. min)
Standard Rate:
$40/hr. Resident
Rate: $35/hr.
Resident: $35/hr
Standard: $39/hr
9 Gymnasiums
Hook Community Center (2 hr. min)
Standard Rate:
$120/hr.
Resident Rate:
$100/hr.
Resident: $100/hr
Standard: $110/hr
Westwinds Sports Center (2 hr. min)
Standard Rate:
$105/hr.
Resident Rate:
$90/hr.
Resident: $90/hr
Standard: $99/hr
Westwinds Activity Center (2 hr. min)
Standard Rate:
$85/hr.
Resident Rate:
$75/hr.
Resident: $75/hr
Standard: $83/hr
City of Victorville
Master Fee Schedule
DRAFT Recreation, Page 57 of 58
Recreation
Current Fee /
Deposit
Recommended Fee Level / Deposit
CPI 3.29%Fee No. Fee Name
Notes
10 Doris Davies Pool
1-60 people
Resident:
$250/3hr
Non-resident:
$275/3hr
Resident: $250/3hr
Non-resident: $275/3hr
61-120 people
Resident:
$275/3hr
Non-resident:
$300/3hr
Resident: $275/3hr
Non-resident: $303/3hr
121-184 people
Resident:
$300/3hr
Non-resident:
$325/3hr
Resident: $300/3hr
Non-resident: $330/3hr
11 Reserved Picnic Areas
Large Picnic Area
Resident: $90
Non-resident:
$105
Resident: $93
Non-resident: $102
Medium Picnic Area
Resident: $70
Non-resident:
$85
Resident: $72
Non-resident: $79
Small Picnic Area
Resident: $40
Non-resident:
$55
Resident: $41
Non-resident: $45
12 Administrative
Refund Processing Fee (per occurrence) 13$ 15$ Facility Use & Special Event Support Fees
Full Time Staff 116$ 120$
Part Time Staff 50$ 52$
Porta Potties Per vendor contract
Damage Deposit
Facility without alcohol 200$ 200$
Facility with alcohol 500$ 500$
Security 50$ Per vendor contract
Insurance Per vendor contract
Notes
[1] Fine/Penalty
City of Victorville
Master Fee Schedule
DRAFT Recreation, Page 58 of 58