Text extracted from the city's file for reading and search. Open the original on victorvilleca.primegov.com. That file is the official record.

Attachment C

©2016, 2017 Musco Sports Lighting, LLC - 1 - M-2038-enUS-5

Quote Quote
Date: December 21, 2023 Project: Hook Community Park Football To: Mr. Eddie Gleason City of Victorville
Victorville, California Ref: 123852
Quote Price – Materials Only Delivered to Job Site
Soccer (360x210) – 30 Footcandle Level Field- $255,000.00

Estimated Sales Tax 8.75% (confirm at time of order) $22,312.50

Sales tax, wholesale markup, bonding, labor, and unloading of the equipment are not included.

Pricing furnished is effective for 60 days unless otherwise noted and is considered confidential.

Light-Structure System with Total Light Control – TLC for LED™ technology Guaranteed Lighting Performance
• Guaranteed light levels of 30 foot-candles average

Lighting Equipment - Soccer
(5) Pre-cast concrete bases with integrated grounding
(5) 70’ Galvanized steel poles – Poles S1, S2, S3, S4, S5 Factory wired and tested remote electrical component enclosures Pole length, factory assembled wire harnesses
(23) Factory aimed and assembled luminaries (TLC-LED-1500 – Soccer Field Lighting) (5) OSQ Security Fixtures mounted at 25’ facing the field. Light Poles S1, S2, S3, S4, S5. (5) GFCI Receptacles with extra duty lockable covers at 44” on poles S1, S2, S3, S4, S5. (electrical circuit to 120v GFCI by other)
(5) Security Camera Mount brackets at 15’ on poles S1, S2, S3, S4, S5. (security camera by other). (5) Speaker Brackets Mounted at 28’ facing the field. (speakers by other).

Control Systems and Services
• Control-Link® System for remote on/off control and performance monitoring with 24/7 customer support. (1) CMC 24” x 72”.
• Powerline Dimming Control which provides High, Medium, Low dimming settings.

Operation and Warranty Services
• Reduction of energy and maintenance costs by 50% to 85% over typical 1500W metal halide equipment • Product assurance and warranty program that covers materials and onsite labor, eliminating 100% of your maintenance costs for 25 years-
Payment Terms
Musco’s Credit Department will provide payment terms.

Project Notes
Estimate is based on:
• Shipment of entire project together to one location
• 480 Volt, 3 Phase electrical system requirement- confirm voltage / phasing. Confirm electrical panel with City and EE. • Structural code and wind speed = 2022 CBC, 110 MPH per DSA project plans. • Confirmation of pole locations prior to production
• See Musco Lighting Design dated September 9, 2022. File 123852C. • Musco will assist with equipment delivery coordination with the project contractor. The contractor will be required to unload, and store City supplied lighting equipment.

©2016, 2017 Musco Sports Lighting, LLC - 2 - M-2038-enUS-5

Quote Quote

DSA Information Overview
DSA Inspection: The California Building Code, Title 24 requirements, state that a DSA approved inspector be present to inspect pre-cast concrete bases and shop welding during production. DSA also requires that the concrete bases be inspected/tested by an approved laboratory. Musco is providing this for informational purposes only and is not involved in the actual contracting of the inspectors or laboratories by the customer. Musco will, however, assist in coordinating the activities required to meet DSA requirements.

The DSA website can provide you with a list of approved labs. You may utilize any DSA-approved testing lab and Musco will assist in coordinating the individual inspections of bases and welds. The first inspection would be at Fonterra Concrete Products Inc. in Elk River, MN to inspect the pouring of the concrete base. After the bases have been poured, there is a 28-day cure time and a successful pour test before they can be shipped to Musco where they will join the remainder of your product and be scheduled for delivery to the job site. (If your project is on a tight time frame, there are pre-inspected DSA approved concrete bases that are presently in Musco's inventory.

These bases will have already passed the 28-day cure time and the inspection house will have the approved lab results for these bases. Musco can provide you with the company name and contact information upon request.) Otherwise during this cure time, the inspection lab will work with Musco to schedule a time for inspection of welds on the poles at Musco Lighting, LLC. Seam Weld Inspections (if required) is coordinated through Musco and Valmont at Valley Nebraska a Musco Vendor.

Delivery to the job site for DSA projects can vary from 10-14 weeks. Musco must have the following information in order to schedule production of a project:

1. Approved Submittals

2. Stamped/signed approved DSA drawings,

3. Contact information for the DSA certified inspection lab and specific inspection requirements

4. Confirmation of order details including voltage/phase and pole locations. (Due to the built-in custom light control per luminaire, pole locations need to be confirmed prior to production. Changes to pole locations after the product is sent to production could result in additional charges.) Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details.

Mike Higgins
Musco Sports Lighting, LLC
3002 Dow Ave, Suite #504
Phone: 800-659-0117 ext 6121 / E-mail: [email protected]